WorldWideScience

Sample records for ts commissioning electrical

  1. TS/EL ELECTRICAL WORK REQUEST FORM

    CERN Multimedia

    TS Department

    2008-01-01

    To facilitate the processing of requests for minor electrical installation work to be carried out by the TS/EL group, a new procedure designed to improve contacts and exchange of information with customers has been set up. The procedure comprises a check to determine whether the TS/EL or the TS/FM group is responsible for the area where the electrical work is to be done. If the work is to be performed by the EL group, an on-line request form must be completed. The following steps must be completed: On a web browser, use the link http://ts-dep.web.cern.ch/ts-dep/groups/el/el.htm In the left-hand menu choose ‘Demande de Travaux Electriques’ Enter the building number to check which group to contact and click ‘FIND’ If the area is: Under FM’s responsibility:\tCall 77777 Under EL’s responsibility:\tClick the link to the work form, complete it and send it (click ‘ENVOYER’) IMPORTANT This form is for minor electrical installation requests only. Please call 72201 in t...

  2. State Electricity Commission of Victoria. Annual report 1984-1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The State Electricity Commission of Victoria is a body corporate first constituted under the Electricity Commissioner's Act 1918. It now operates under the State Electricity Commission Act 1958. It generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.424 million customers. In addition 277,800 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a regulatory responsibility to ensure the safe use of electricity. It employs 22,518 people. The installed capacity of generators in the Commission's system, plus Victoria's share of Snowy and Hume generation, totalled 6603 MW at 30 June 1985 and the main transmission system comprises 500 kV, 300 kV and 220 kV lines. Corporate objectives have been developed in seven broad areas: customers,employee, finance, ntural resources, environment, conservationand community. These areas of activity are detailed in this report.

  3. State Electricity Commission of Victoria annual report 1983-1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The State Electricity Commission of Victoria (SECV) generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.390 million customers. In addition, 278,500 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a responsibility to ensure the safe use of electricity. The Commission's mission statement is 'to provide cost effective energy and services and to act at all times in the best interests of the people of Victoria by being a responsible, adaptive, financially sound and efficient public utility'. The mission statement is the foundation for all activities and should provide the Commission with a sense of direction and unity of purpose. Corporate objectives have been developed in the following seven broad areas: customer, employee, finance, natural resources, environment, conservation and community. Each objective has been translated into a series of specific goals, the achievement of which will be monitored. Details relating to these areas of activity are detailed in this report.

  4. State Electricity Commission of Victoria annual report 1991/92

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The 73rd annual report of the State Electricity Commission (SEC) of Victoria covers the financial year ended 30 June 1992. A total revenue of 3,300 million dollars and a net profit of 155.7 million dollars was recorded. There was continued improvement in employee productivity. Progress was made on the Victorian Power Pool (VicPool) pooling arrangement in anticipation of open access to the power grid. A 3-year business plan was formulated and corporate strategy revised. The Strategic Research Program on brown coal technologies, aimed at reducing costs of electricity and emissions of CO[sub 2], continued. Environmental activities continued in the areas of renewable energy source development, air quality monitoring, acid rain, water management, land rehabilitation and improvements to powerlines. The report includes statistical data on customer statistics, electricity sales, power stations, brown coal and briquette production and financial sales.

  5. The State Electricity Commission of Victoria and the greenhouse effect

    International Nuclear Information System (INIS)

    Hoy, R.D.

    1990-01-01

    The State Electricity Commission of Victoria is examining how the greenhouse issue may affect its electricity supply system in the future. Possible generation scenarios for 2005 are presented in order to show how the Toronto goal of a 20% reduction on 1988 levels of CO 2 emissions could be achieved. The main approaches to achieving these emission reductions include energy conservation and cogeneration, new gas-fired plant, use of renewable energy, reduction of energy system losses, retirement of older brown coal plant and an extensive tree planting program. It is estimated that achieving the Toronto goal would require electricity prices to rise by 1% to 1.5%, on average, each year by more than they otherwise would have, for the next 15 years. 12 refs., 3 tabs

  6. Environmental management in the Hydro-Electric Commission

    International Nuclear Information System (INIS)

    Scanlon, A.

    1995-01-01

    The Tasmanian Hydro Electric Commission (HEC) is a large and diverse organization, providing electricity generation, transmission, distribution and retail services throughout Tasmania. It is a significant manager of Tasmania's land and water resources and, as a consequence, has important environmental responsibilities. This paper outlines the background to conflict with the environmental movement over power generation development projects in south western Tasmania and the development of an environmental policy. As part of the environmental policy, the HEC has prepared environmental reviews, audits and risk assessment and is currently developing and implementing a comprehensive environmental management system. The HEC sees the introduction of the environmental management system as demonstrating a commitment to continuing environmental improvement and in establishing itself as a Tasmanian and national leader in the area of environmental management. 1 tab., 2 figs., 4 refs

  7. 77 FR 9273 - WORKSHOP Sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute...

    Science.gov (United States)

    2012-02-16

    ... Commission and the Electric Power Research Institute on the Treatment of Probabilistic Risk Assessment.... SUMMARY: The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research (RES), in cooperation with the Electric Power Research Institute (EPRI), will hold a joint workshop on the Treatment of...

  8. Electrical Resistance of Ag-TS-S(CH2)(n-1)CH3//Ga2O3/EGaln Tunneling Junctions

    NARCIS (Netherlands)

    Cademartiri, Ludovico; Thuo, Martin M.; Nijhuis, Christian A.; Reus, William F.; Tricard, Simon; Barber, Jabulani R.; Sodhi, Rana N. S.; Brodersen, Peter; Kim, Choongik; Chiechi, Ryan C.; Whitesides, George M.

    2012-01-01

    Tunneling junctions having the structure Ag-TS-S(CH2)(n-1)CH3//Ga2O3/EGaIn allow physical-organic studies of charge transport across self-assembled monolayers (SAMs). In ambient conditions, the surface of the liquid metal electrode (EGaIn, 75.5 wt % Ga, 24.5 wt % In, mp 15.7 degrees C) oxidizes and

  9. 77 FR 47060 - Missouri Joint Municipal Electric Utility Commission; Notice of Filing

    Science.gov (United States)

    2012-08-07

    ... Municipal Electric Utility Commission filed a Proposed Revenue Requirement for reactive supply service under... Room in Washington, DC. There is an ``eSubscription'' link on the web site that enables subscribers to...

  10. Report of the Commission on electricity market organization

    International Nuclear Information System (INIS)

    2009-01-01

    After having stated the three objectives of a public policy for a sustainable development of the electricity market, this report shows that the current situation is neither economically satisfying on a short term basis, nor sustainable on a long term basis, notably because market prices in France do not reflect the competitive advantages of the production stock, because the multiplication of regulated prices does not ensure a global economic coherence, and because new incomers do not have any development margin. The authors then state that the regulation must evolve from a general and permanent one to a more targeted and dynamic one while taking the necessity of providing electricity to small consumers, the European law, and competitiveness into account. Two solutions are proposed for such an evolution

  11. An improved FEM model for computing transport AC loss in coils made of RABiTS YBCO coated conductors for electric machines

    International Nuclear Information System (INIS)

    Ainslie, Mark D; Yuan Weijia; Flack, Timothy J; Coombs, Timothy A; Rodriguez-Zermeno, Victor M; Hong Zhiyong

    2011-01-01

    AC loss can be a significant problem for any applications that utilize or produce an AC current or magnetic field, such as an electric machine. The authors investigate the electromagnetic properties of high temperature superconductors with a particular focus on the AC loss in superconducting coils made from YBCO coated conductors for use in an all-superconducting electric machine. This paper presents an improved 2D finite element model for the cross-section of such coils, based on the H formulation. The model is used to calculate the transport AC loss of a racetrack-shaped coil using constant and magnetic field-dependent critical current densities, and the inclusion and exclusion of a magnetic substrate, as found in RABiTS (rolling-assisted biaxially textured substrate) YBCO coated conductors. The coil model is based on the superconducting stator coils used in the University of Cambridge EPEC Superconductivity Group's all-superconducting permanent magnet synchronous motor design. To validate the modeling results, the transport AC loss of a stator coil is measured using an electrical method based on inductive compensation by means of a variable mutual inductance. Finally, the implications of the findings on the performance of the motor are discussed.

  12. An improved FEM model for computing transport AC loss in coils made of RABiTS YBCO coated conductors for electric machines

    Energy Technology Data Exchange (ETDEWEB)

    Ainslie, Mark D; Yuan Weijia; Flack, Timothy J; Coombs, Timothy A [Department of Engineering, University of Cambridge, 9 J J Thomson Avenue, Cambridge CB3 0FA (United Kingdom); Rodriguez-Zermeno, Victor M [Department of Mathematics, Technical University of Denmark, Kongens Lyngby 2800 (Denmark); Hong Zhiyong, E-mail: mda36@cam.ac.uk [School of Electronic, Information and Electrical Engineering, Shanghai Jiao Tong University, Shanghai (China)

    2011-04-15

    AC loss can be a significant problem for any applications that utilize or produce an AC current or magnetic field, such as an electric machine. The authors investigate the electromagnetic properties of high temperature superconductors with a particular focus on the AC loss in superconducting coils made from YBCO coated conductors for use in an all-superconducting electric machine. This paper presents an improved 2D finite element model for the cross-section of such coils, based on the H formulation. The model is used to calculate the transport AC loss of a racetrack-shaped coil using constant and magnetic field-dependent critical current densities, and the inclusion and exclusion of a magnetic substrate, as found in RABiTS (rolling-assisted biaxially textured substrate) YBCO coated conductors. The coil model is based on the superconducting stator coils used in the University of Cambridge EPEC Superconductivity Group's all-superconducting permanent magnet synchronous motor design. To validate the modeling results, the transport AC loss of a stator coil is measured using an electrical method based on inductive compensation by means of a variable mutual inductance. Finally, the implications of the findings on the performance of the motor are discussed.

  13. Automatic analysis at the commissioning of the LHC superconducting electrical circuits

    International Nuclear Information System (INIS)

    Reymond, H.; Andreassen, O.O.; Charrondiere, C.; Rijllart, A.; Zerlauth, M.

    2012-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW TM applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized. (authors)

  14. Automatic Analysis at the Commissioning of the LHC Superconducting Electrical Circuits

    CERN Document Server

    Reymond, H; Charrondiere, C; Rijllart, A; Zerlauth, M

    2011-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW™ applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized.

  15. From franchise to state commission: Regulation of the electric utility industry, 1907 to 1932

    Science.gov (United States)

    Reutter, Keith Alan

    1997-09-01

    Empirical research into the effects of regulation on industry has been around since the early 1960s. Over the last thirty plus years a number of interesting results have been brought to the fore. For instance, it has been found that regulation of the trucking industry limits entry and increases prices. A similar result has been pointed to in other industries such as commercial airlines and banking. The effect of the state commission form of regulation on the electric utility industry has been less conclusive. State commissions became dominant during the period 1910-1930, replacing local franchising as a method of regulating the electric utility industry. Two competing theories suggest why this transformation took place, the "capture" and "public interest" theories of regulation. The capture theory of regulation suggests that the electric utility industry demanded state regulation as a way to earn above normal profits and reduce competition. The public interest theory suggests the purpose of regulation by state commissions was to benefit the general public by forcing the industry to be competitive. Few studies have tried to determine which theory more aptly describes the actual events that took place. The empirical model developed in Chapter V, is an extension of the current literature. A set of simultaneous equations describing the natural gas and electricity markets is estimated using cross-sectional time-series data from 1907 to 1932. The effect of regulation on the electric utility industry is modeled with a dummy variable taking on a value of one to designate that a state commission had been established. The results suggest the capture theory of regulation best describes the period under study. The empirical estimates indicate that state commissions (1) reduced the rate at which the real price of electricity was falling, (2) had a negative impact on firms entering the industry, (3) had a positive influence on the cost of producing a kwh of electricity, and (4

  16. Design, production and first commissioning results of the electrical feedboxes of the LHC

    International Nuclear Information System (INIS)

    Perin, A.; Atieh, S.; Benda, V.; Bertarelli, A.; Bouillot, A.; CERN; Brodzinski, K.; Wroclaw Tech. U.; Folch, R.; CERN; Fydrych, J.; Wroclaw Tech. U.; Genet, M.; Koczorowski, S.; Metral, L.; CERN; Serpukhov, IHEP; Fermilab; CERN; Serpukhov, IHEP; CERN; Serpukhov, IHEP

    2007-01-01

    A total of 44 CERN designed cryogenic electrical feedboxes are needed to power the LHC superconducting magnets. The feedboxes include more than 1000 superconducting circuits fed by high temperature superconductor and conventional current leads ranging from 120 A to 13 kA. In addition to providing the electrical current to the superconducting circuits, they also ensure specific mechanical and cryogenic functions for the LHC. The paper focuses on the main design aspects and related production operations and gives an overview of specific technologies employed. Results of the commissioning of the feedboxes of the first LHC sectors are presented

  17. Renewable Electricity Benefits Quantification Methodology: A Request for Technical Assistance from the California Public Utilities Commission

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, G.; Vimmerstedt, L.

    2009-07-01

    The California Public Utilities Commission (CPUC) requested assistance in identifying methodological alternatives for quantifying the benefits of renewable electricity. The context is the CPUC's analysis of a 33% renewable portfolio standard (RPS) in California--one element of California's Climate Change Scoping Plan. The information would be used to support development of an analytic plan to augment the cost analysis of this RPS (which recently was completed). NREL has responded to this request by developing a high-level survey of renewable electricity effects, quantification alternatives, and considerations for selection of analytic methods. This report addresses economic effects and health and environmental effects, and provides an overview of related analytic tools. Economic effects include jobs, earnings, gross state product, and electricity rate and fuel price hedging. Health and environmental effects include air quality and related public-health effects, solid and hazardous wastes, and effects on water resources.

  18. 75 FR 49945 - In the Matter of Certain Hybrid Electric Vehicles and Components Thereof; Notice of Commission...

    Science.gov (United States)

    2010-08-16

    ... Toyota hybrid vehicles of claims of U.S. Patent No. 5,343,970. On July 19, 2010, Paice and Toyota moved... INTERNATIONAL TRADE COMMISSION [ Inv. No. 337-TA-688] In the Matter of Certain Hybrid Electric Vehicles and Components Thereof; Notice of Commission Determination Not To Review an Initial Determination...

  19. An improved FEM model for computing transport AC loss in coils made of RABiTS YBCO coated conductors for electric machines

    DEFF Research Database (Denmark)

    Ainslie, Mark D; Rodriguez Zermeno, Victor Manuel; Hong, Zhiyong

    2011-01-01

    and magnetic field-dependent critical current densities, and the inclusion and exclusion of a magnetic substrate, as found in RABiTS (rolling-assisted biaxially textured substrate) YBCO coated conductors. The coil model is based on the superconducting stator coils used in the University of Cambridge EPEC...

  20. CRE answer to the European Commission public consultation on the new electricity market design

    International Nuclear Information System (INIS)

    Ladoucette, Philippe de

    2015-01-01

    On July 15, 2015, the European Commission launched a public consultation on the new Electricity Market Design. All National Regulatory Authorities (NRAs), and CRE in particular, contributed to the joint ACER-CEER response to the consultation. CRE supports this joint response, and further develops some topics in this document, building on its particular experience in the implementation of the internal energy market: implementation of the network codes, in particular those regarding the markets, development of demand-side flexibility, development of interconnections, and alignment of fragmented balancing markets

  1. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  2. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  3. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  4. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  5. Proposal for the creation of an inquiry commission to investigate the reality of electricity production costs in France

    International Nuclear Information System (INIS)

    2009-01-01

    After EDF's president has asked for a 20 percent rise for retail electricity prices in France, a group of members of the French Parliament has proposed the creation of an inquiry commission to investigate the costs of electricity production and transport in France (depending on production mode), evaluate the investments required to ensure a safe and reliable operation of nuclear plants, compare the investments needed depending on various electricity production modes for the next ten years in France, study various scenarios including the shutdown of all nuclear plants in the country, and therefore be able to evaluate the tariff evolutions that are required for the future

  6. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  7. Manual on quality assurance for installation and commissioning of instrumentation, control and electrical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    1989-01-01

    The present Manual on Quality Assurance (QA) for Installation and Commissioning of Instrumentation, Control and Electrical (ICE) Equipment of Nuclear Power Plants contains supporting material and illustrative examples for implementing basic requirements of the quality assurance programme in procurement, receiving, installation and commissioning of this equipment. The Manual on Quality Assurance for Installation and Commissioning of ICE Equipment is designed to supplement and be consistent with the Guidebook as well as with the IAEA Code and Safety Guides on Quality Assurance. It is intended for the use of managerial staff and QA personnel of nuclear power plant owners or the organizations respectively responsible for the legal, technical, administrative and financial aspects of a nuclear power plant. The information provided in the Manual will also be useful to the inspection staff of the regulatory organization in the planning and performance of regulatory inspections at nuclear power plants

  8. Competition and deregulation in the electric industry. A study of organizational change: The New York State Public Service Commission

    Science.gov (United States)

    Ashley, Deborah J. Cordaro

    2000-11-01

    Public organizations are formed in response to societal needs. They collect taxes, educate children, enforce laws and provide protection to the environment, the nation and consumers. One such organization is the New York State Public Service Commission. In 1907, legislation was passed to form the New York State Public Service Commission the first regulatory body of its kind in the United States. Its mission was to provide safe, reliable and reasonably priced electricity. Subsequently, this became the model that was implemented in every state in the nation. The past decade heralds an era of competition and a lessening of regulatory control. The telephone, natural gas and airline industries are in various stages of deregulation, and the electric industry is beginning down this path as well. In an environment such as this, are regulatory organizations necessary, and if they are, how can they organize to meet the new societal requirements? The case of the New York State Public Service Commission at this point in time offers a real time study of a regulatory body immersed in an environment that is calling for competition and an end to big government. Utilizing case studies of industries that have deregulated, or are in the process of deregulating, indicates a future societal need for regulations. This result does not lead to a conclusion that organizational change is unnecessary. This Dissertation will lay out the current organizational structure of the Public Service Commission, give an overview of the environmental signals, describe the mission/core values, and illustrate general political and employee factors that are indigenous to public service. Utilizing both classic and current organizational theory, an evaluation will be made of the Commission's need for change, their ability to change, and obstacles they may encounter.

  9. 77 FR 7211 - Pacific Gas and Electric Company, Diablo Canyon Independent Spent Fuel Storage Installation...

    Science.gov (United States)

    2012-02-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-26; NRC-2011-0110] Pacific Gas and Electric Company...) issued NRC Materials License No. SNM-2511 to the Pacific Gas and Electric Company (PG&E) for the Diablo.... 5. TS 3.1.2, ``Spent Fuel Storage Cask (SFSC) Heat Removal System,''--revise to allow the HI-STORM...

  10. 76 FR 37809 - The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver...

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition...

  11. Transcutaneous Spinal Direct Current Stimulation (tsDCS

    Directory of Open Access Journals (Sweden)

    Filippo eCogiamanian

    2012-07-01

    Full Text Available In the past ten years renewed interest has centered on non-invasive transcutaneous weak direct currents applied over the scalp to modulate cortical excitability (brain polarization or transcranial direct current stimulation, tDCS. Extensive literature shows that tDCS induces marked changes in cortical excitability that outlast stimulation.Aiming at developing a new, non invasive, approach to spinal cord neuromodulation we assessed the after-effects of thoracic transcutaneous spinal DC stimulation (tsDCS on somatosensory potentials (SEPs evoked in healthy subjects by posterior tibial nerve (PTN stimulation. Our findings showed that thoracic anodal tsDCS depresses the cervico-medullary PTN-SEP component (P30 without eliciting adverse effects. tsDCS also modulates post-activation H-reflex dynamics. Later works further confirmed that transcutaneous electric fields modulate spinal cord function. Subsequent studies in our laboratory showed that tsDCS modulates the flexion reflex in the human lower limb. Besides influencing the laser evoked potentials, tsDCS increases pain tolerance in healthy subjects. Hence, though the underlying mechanisms remain speculative, tsDCS modulates activity in lemniscal, spinothalamic and segmental motor systems.Here we review currently available experimental evidence that non-invasive spinal cord stimulation influences spinal function in humans and argue that, by focally modulating spinal excitability, tsDCS could provide a novel therapeutic tool complementary to drugs and invasive spinal cord stimulation in managing various pathologic conditions, including pain.

  12. Commissioning and First Operation of the Low-Beta Triplets and Their Electrical Feed Boxes at the Large Hadron Collider

    CERN Document Server

    Darve, C; Casas-Cubillos, J; Claudet, S; Feher, S; Ferlin, G; Kerby, J; Metral, L; Perin, A; Peterson, T; Prin, H; Rabehl, R; Vauthier, N; Wagner, U; van Weelderen, R

    2010-01-01

    The insertion regions located around the four interaction points of the Large Hadron Collider (LHC) are mainly composed of the low-b triplets, the separation dipoles and their respective electrical feed-boxes (DFBX). The low-b triplets are Nb-Ti superconductor quadrupole magnets, which operate at 215 T/m in superfluid helium at a temperature of 1.9 K. The commissioning and the first operation of these components have been performed. The thermo-mechanical behavior of the low-b triplets and DFBX were studied. Cooling and control systems were tuned to optimize the cryogenic operation of the insertion regions. Hardware commissioning also permitted to test the system response. This paper summarizes the performance results and the lessons learned.

  13. Report on the behalf of the Commission of inquiry on electricity tariffs. Nr 2618

    International Nuclear Information System (INIS)

    Gaymard, Herve; Valter, Clotilde

    2015-01-01

    This huge report first proposes a critical overview of the current French electricity tariff system and a new arrangement. In this overview, the authors indicate the various objectives of this tariff: to cover the costs of electricity providers, to cover the costs of grid managers, to ensure the geographical equalization of electricity price, to preserve the household purchasing power, to favour enterprise competitiveness, to implement energy transition, to influence user energy consumption, to make available financial resources for local communities and State, and to finance pensions of staff of electricity and gas industries. They describe the current situation which can be defined as an end of a monopoly without any actual competition: salami slicing of the electricity sector, a marginal and costly competition (limited opening to competition, price increase instead of decrease). They also describe the situation of EDF, its evolution from a golden age to a critical situation, a financial situation on a razor's edge, an incoherent and disturbing State. They present the European legal framework as unanimously contested, and the main challenges of energy transition. Then, the authors describe how to introduce coherence in the tariff system again: by giving means to EDF to face future challenges (by clarifying the State's position, by decreasing EDF's costs, by enabling EDF to play leading role in the world in the field of low-carbon energies), by supporting an integrated vision of a Europe of electricity (by developing a more ambitious European framework), and by revising the electricity tariff structure. The many hearings of various actors of the electricity and energy sectors are reported (these actors belong to public bodies, energy companies, professional associations, consumer associations, and so on)

  14. Report made under the behalf of the Economic Affairs Commission on the bill (N. 2831), modified by the Senate, for a new organization of the electricity market

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports the discussions of the Economic Affairs Commission of the French Parliament on the different articles of the bill addressing the new organization of the electricity market. These articles concern the access to nuclear energy, the purchase price of electricity produced from biomass and of hydroelectricity, the obligations of electricity providers, the financing of works performed on the network, the protection of users, the competencies of local communities and providers, the social regulations applied to providers, and tax aspects. A table gives a comparison between the texts adopted by the Assemblee Nationale, the Senate, and the Commission. It also gives the various amendments which have been proposed

  15. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  16. The European Union: When the Commission and Governments put the Future of Electricity Producers at Stake

    International Nuclear Information System (INIS)

    Lesourne, Jacques

    2016-01-01

    RWE, EON, EDF, ENGIE and other large utilities are in financial turmoil. This situation, which would have been unlikely twenty years ago, is related to several failures in governance within the EU as well as to global evolutions. This Edito Energie analyses the situation of large European electricity producers in light of the European energy policy

  17. Analysis of electrical systems from Cernavoda NPP - Unit 1 based on commissioning activity

    International Nuclear Information System (INIS)

    Goia, M.L.; Manolescu, I.

    1996-01-01

    Several design solutions regarding the electrical part of Cernavoda NPP Unit 1 station auxiliaries are discussed in this paper. The solutions mentioned may have different variants which should be taken into consideration in the design of Units U2 - U5. This work offers an ample debate on such matters as the supply source connection of the station auxiliaries, the use of two different voltages for the mean voltage (MV) supply, the consequence of the lack of breakers on the 24 kV part of station auxiliary transformers T03 - T04, the protection devices non correlated with the breakers to which they react, as well as the consequences of low subtransient reactance of the new stand-by Diesel generators. Besides these design solutions that can influence the station auxiliaries reliability, matters as malfunctioning of the dry type MV/LV transformers and unreliable behaviour of some MV composite insulators are also discussed. For some of the above mentioned problems the authors proposed several solutions. (authors). 1 fig., 1 tab

  18. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  19. Evaluation of Waterford Steam Electric Station Unit 3 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-09-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Waterford Steam Electric Station Unit 3 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Waterford T/S. Several discrepancies were identified and subsequently resolved by the cognizant NRC reviewer. Pending completion of the resolutions noted in Part 3 of this report, the Waterford Steam Electric Station Unit 3 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  20. Talk of Mr Jean Syrota, head of the commission of electricity regulation, given at the 'confrontations' colloquium; Intervention de M. Jean Syrota President de la Commission de Regulation de l'Electricite au colloque confrontations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This paper is a reprint of the talk given on November 30, 2001, by J. Syrota, head of the French commission of electricity regulation (CRE), at the 'confrontations' conference about the European energy policy. In his talk, J. Syrota analyses the importance of competition in the development of a European energy market, the role of CRE as independent managing authority in keeping competition alive, and the importance of the development of international interconnections in the creation of a unique (European) energy market. (J.S.)

  1. Safety Commission databases support

    CERN Document Server

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  2. TS LOOP ALCOVE VENTILATION ANALYSIS

    International Nuclear Information System (INIS)

    T.M. Lahnalampi

    2000-01-01

    The scope of this analysis is to examine the existing, constructor installed, physical ventilation installations located in each of the Exploratory Studies Facility (ESF) Topopah Springs (TS) Loop Alcoves No.1, No.2, No.3, No.4, No.6, and No.7. Alcove No.5 is excluded from the scope of this analysis since it is an A/E design system. Each ventilation installation will be analyzed for the purpose of determining if requirements for acceptance into the A/E design technical baseline have been met. The ventilation installations will be evaluated using Occupational Safety and Health Administration (OSHA) standards and Exploratory Studies Facility Design Requirements (ESFDR) (YMP 1997) requirements. The end product will be a technical analysis that will define ventilation installation compliance issues, any outstanding field changes, and use-as-is design deviations that are required to bring the ventilation installations into compliance with requirements for acceptance into the A/E design technical baseline. The analysis will provide guidance for alcove ventilation component design modifications to be developed to correct any deficient components that do not meet minimum requirements and standards

  3. Advanced high temperature superconductor film-based process using RABiTS

    International Nuclear Information System (INIS)

    Goyal, A.; Hawsey, R.A.; Hack, J.; Moon, D.

    2000-01-01

    The purpose of this Cooperative Research and Development Agreement (CRADA) between Lockheed Martin Energy Research Corporation (Contractor), Managing contractor for Oak Ridge National Laboratory (ORNL) and Midwest Superconductivity, Inc. (MSI) and Westinghouse Science and Electric Company (WEC) was to develop the basis for a commercial process for the manufacturing of superconducting tape based on the RABiTS technology developed at ORNL. The chosen method for deposition of YBCO films on RABiTS was Metal Organic chemical Vapor Deposition (MOCVD)

  4. The too expensive invoice of the wind energy. The electric power regulation commission criticizes the State tariff; La facture trop lourde des eoliennes. La commission de regulation de l'electricite critique le tarif fixe par l'Etat

    Energy Technology Data Exchange (ETDEWEB)

    Nathan, E.; Delbecq, D.; Coroller, C.; Cori, N.; Bernard, C.

    2001-07-01

    After the order of the 12 june, fixing the purchase tariffs of the wind energy, the CRE (electric power regulation commission) contested this tariff: this wind energy development policy is too expensive for the collectivity. (A.L.B.)

  5. Do's and Don'ts for Liposuction

    Science.gov (United States)

    ... for Every Season How to Choose the Best Skin Care Products In This Section Dermatologic Surgery What is dermatologic ... for Every Season How to Choose the Best Skin Care Products Do's and don’ts for liposuction Don’t ...

  6. Not in Traffic Surveillance (NiTS)

    Data.gov (United States)

    Department of Transportation — The Not-in-Traffic Surveillance (NiTS) system is a virtual data collection system designed to provide counts and details regarding fatalities and injuries that occur...

  7. Visit of Mr. Susumu Yoda, Japanese Atomic Energy Commission, Mr. Nobuo Natsume, Vice-President, Central Research Institute of Electric Power Industry, Japan (CRIEPI), Mr. Nobuya Yoshiki, CRIEPI, Mrs. Seiko Ichikawa, Interpreter, with Mr. Taylor of CERN, visiting SM18

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    Visit of Mr. Susumu Yoda, Japanese Atomic Energy Commission, Mr. Nobuo Natsume, Vice-President, Central Research Institute of Electric Power Industry, Japan (CRIEPI), Mr. Nobuya Yoshiki, CRIEPI, Mrs. Seiko Ichikawa, Interpreter, with Mr. Taylor of CERN, visiting SM18

  8. Inquiry commission on the real cost of electricity in order to determine the charging for the different economic agents. Press conference of July 18, 2012

    International Nuclear Information System (INIS)

    Vial, Jean-Pierre; Fauconnier, Alain; Leonard, Claude; Pintat, Xavier; Sittler, Esther; Desessard, Jean; Lenoir, Jean-Claude; Pastor, Jean-Marc; Schurch, Mireille; Dantec, Ronan; Kerdraon, Ronan; Mirassou, Jean-Jacques; Rossignol, Laurence; Berthou, Jacques; Kaltenbach, Philippe; Merceron, Jean-Claude; Requier, Jean-Claude; Beaumont, Rene; Hure, Benoit; Marseille, Herve; Poniatowski, Ladislas; Grosdidier, Francois

    2012-01-01

    After having recalled the context of creation of the inquiry commission, and given an overview of the performed work (hearings, visits, actions), this document outlines that electricity bills paid by French people are among the most expensive despite a low KWh cost. It discusses how to assess the cost and competitiveness of the electricity produced by the nuclear sector while outlining the several uncertainties on this issue. It comments the development of renewable energies, outlines the need for an increased energy production to face the demand increase, discusses the increase of nuclear costs, outlines the differences between the different renewable energies, outlines the increase of grid costs, and comments the evolution of the household annual electricity bill. It stresses the importance of a new impulse for energy savings, and of the search for a new equilibrium between 'producing more' and 'consuming less'. It outlines the challenges of energy storage, and the different issues to be debated as far as nuclear energy is concerned. It presents three scenarios: phasing out nuclear with a strong program of energy savings and a development of renewable energies, an intermediate scenario with a replacement of second generation reactors by a small number of EPRs while developing renewable energies, and a scenario based on new generation nuclear technologies (EPR, and even fourth-generation technologies). It highlights the different issues and problems related to the actual electricity cost, and to the financing of grid improvement

  9. TS-1 and TS-2 transient overpower tests on FFTF fuel

    International Nuclear Information System (INIS)

    Pitner, A.L.; Ferrell, P.C.; Culley, G.E.; Weber, E.T.

    1985-01-01

    The TS-1 and TS-2 TREAT transient experiments subjected a low burnup (2 MWd/kg) and a medium burnup (58 MWd/kg), respectively, FFTF irradiated fuel pin to unprotected 5 cents/s overpower transient conditions. The fuel pin failure response was similar in the two tests, which demonstrated a large margin to failure (P/P 0 > 3) and a favorable upper level failure location. Thus, for these transient conditions, burnup effects on transient performance appeared to be minimal in the range tested. Pin disruption in the medium burnup TS-2 test was more severe due to the higher fission gas pressurization, but failure occurred at only a 5% lower power level than for the low burnup TS-1 fuel pin. Both tests exhibited axial extrusion of molten fuel to the region above the fuel column several seconds before pin failure, demonstrating a potentially beneficial inherent safety mechanism to delay failure and mitigate accident consequences

  10. Environmental challenges and opportunities of the evolving North American electricity market : A review: Environmental challenges and opportunities of the North American electricity market : A symposium organized by the Commission for Environmental Cooperation of North America

    International Nuclear Information System (INIS)

    Dukert, J.M.

    2002-06-01

    North America produces and uses over 50 per cent of the electricity in the industrialized world. Regulatory trends in Mexico, the United States and Canada converge toward the opening up of electricity markets, while regional trade of electricity across national borders is being encouraged. Fundamental questions remain concerning the effects on the natural air-water-and-land environment in all three countries and the manner in which this trade occurs. Public health is also a factor to be considered. Some government intervention is required, was the general consensus arrived at at the symposium organized by the Commission for Environmental Cooperation of North America (CEC). This intervention should probably take the form of emission standards, transparent regulatory hearings and efforts to render the rules in the three countries more compatible. Demand growth and the incorporation of pollution controls will require some private investment. The author indicated that the symposium participants recognized that the reconciliation of an efficient continental electricity market with environmental goals will come with improving the efficiency with which North Americans use energy. refs., 1 tab., 1 fig

  11. Information report submitted by the Commission for European Affairs on the new organisation of the electricity market, within the frame of the fourth energy package. Nr 4568

    International Nuclear Information System (INIS)

    Chabanne, Nathalie; Schneider, Andre

    2017-01-01

    After charting the gradual implementation of the European energy policy over the past twenty years, and observing the need to adapt the regulatory framework to promote the necessary developments in the sector to combat climate change, the authors of this parliamentary report examine the four texts (three regulations and one directive) of the fourth energy package on the organisation of the electric power market. They notice that the measures proposed by the European Commission aim at making the electricity market more flexible, at strengthening regional cooperation, at allowing the consumer to play a more active role in the market, at promoting the emergence of a European regulator, and at introducing joint methods for the assessment and management of risks. However, the authors consider that several proposals seem to express a highly pronounced desire for centralisation, and therefore lead to a level of prescription which they consider as incompatible with the need to maintain the competencies of the Member States in this field. Therefore, they make recommendations for a close monitoring of the legislative process and to ensure that some proposals are modified or adapted

  12. T.S. Eliot i nordisk efterkrigstidsdigtning

    DEFF Research Database (Denmark)

    Larsen, Peter Stein

    2009-01-01

    andet indkredses den særlige fascinationskraft ved Eliots æstetik, som den kommer til udtryk i The Waste Land (1922), nemlig at der er tale om en uhyre sofistikeret brug af montageformen. For det tredje peges der gennem et par digtlæsninger på, hvordan Eliots montage-æstetik kan følges i nordisk poesi......Hvad er årsagen til, at T.S. Eliot måske mere end nogen anden digter har haft indflydelse på nordiske digtere i det 20. århundrede? Dette vil blive undersøgt i tre tempi i denne artikel. For det første gives der et generelt rids af, hvor man finder T.S. Eliots aftryk i nordisk litteratur. For det...

  13. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  14. Assessment of TS-1, a thick cane mutant

    International Nuclear Information System (INIS)

    Shama Rao, H.K.

    1979-01-01

    A true breeding thick cane mutant TS-1, induced by radiations, was obtained in variety Co-419. TS-1 was found to be superior to Co-419 with respect to cane size, weight, yield and juice quality. The thick canes of TS-1 were found to be solid even at 14 months age and so also their ratoons. The tillering habit of TS-1 has a definite advantage over other varieties with respect to easy intercultural field operations. TS-1 is now being tested under various agroclimatic zones in Karnataka, Maharashtra and U.P. (auth.)

  15. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  16. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  17. Bureau de documentation TS/EL/DO

    CERN Document Server

    Dujardin, M

    2004-01-01

    Le bureau de documentation a comme responsabilité de fournir et manager toute la documentation nécessaire au groupe TS-EL. Ce travail utilise des outils CAO (EUCLID- AUTOCAD) et de gestion de base de donnés ORACLE (GESMAR,EDMS) largement utilisé dans le département TS mais aussi des applications métiers tel que le transfert des donnés CAO vers les bases de données, le cheminement automatique ou la schématique électrique. La section se concentre sur des études de grands ensembles et l'intégration 3D des équipements électriques. Les études de services généraux sont généralement sous-traitées. Le projet LHC occupe actuellement la quasi totalité de nos ressources. Pour mener à bien les études électriques du LHC, caractérisées par une définition tardive des besoins et de nombreuses modifications, une structure souple et réactive a été mis en place : Une cellule CAO 3D EUCLID, en charge des layouts d'équipements et des cheminements, en relation avec l'intégration, et une cellule d'é...

  18. Solderability study of RABiTS-based YBCO coated conductors

    International Nuclear Information System (INIS)

    Zhang Yifei; Duckworth, Robert C.; Ha, Tam T.; Gouge, Michael J.

    2011-01-01

    Study examines the implication of solder and flux selection in YBCO splice joints. Focus is on commercially available RABiTS-based YBCO coated conductors. Solderability varied with solder and flux for three different stabilizations tested. Resistivity of stabilizer was dominant factor in splice joint resistance. Solder materials affected splice joint resistance when solderability was poor. The solderability of commercially available YBa 2 Cu 3 O 7-x (YBCO) coated conductors that were made from Rolling Assisted Biaxially Textured Substrates (RABiTS)-based templates was studied. The coated conductors, also known as second-generation (2G) high temperature superconductor (HTS) wires (in the geometry of flat tapes about 4 mm wide), were laminated with copper, brass, or stainless steel strips as stabilizers. To understand the factors that influence their solderability, surface profilometry and scanning electron microscopy were used to characterize the wire surfaces. The solderability of three solders, 52In48Sn, 67Bi33In, and 100In (wt.%), was evaluated using a standard test (IPC/ECA J-STD-002) and with two different commercial fluxes. It was found that the solderability varied with the solder and flux but the three different wires showed similar solderability for a fixed combination of solder and flux. Solder joints of the 2G wires were fabricated using the tools and the procedures recommended by the HTS wire manufacturer. The solder joints were made in a lap-joint geometry and with the superconducting sides of the two wires face-to-face. The electrical resistances of the solder joints were measured at 77 K, and the results were analyzed to qualify the soldering materials and evaluate the soldering process. It was concluded that although the selection of soldering materials affected the resistance of a solder joint, the resistivity of the stabilizer was the dominant factor.

  19. REAC/TS radiation accident registry. Update of accidents in the United States

    International Nuclear Information System (INIS)

    Ricks, R.C.; Berger, M.E.; Holloway, E.C.; Goans, R.E.

    2000-01-01

    Serious injury due to ionizing radiation is a rare occurrence. From 1944 to the present, 243 US accidents meeting dose criteria for classification as serious are documented in the REAC/TS Registry. Thirty individuals have lost their lives in radiation accidents in the United States. The Registry is part of the overall REAC/TS program providing 24-hour direct or consultative assistance regarding medical and heath physics problems associated with radiation accidents in local, national, and international incidents. The REAC/TS Registry serves as a repository of medically important information documenting the consequences of these accidents. Registry data are gathered from various sources. These include reports from the World Heath Organization (WHO), International Atomic Energy Agency (IAEA), US Nuclear Regulatory Commission (US NRC), state radiological health departments, medical/health physics literature, personal communication, the Internet, and most frequently, from calls for medical assistance to REAC/TS, as part of our 24-hour medical assistance program. The REAC/TS Registry for documentation of radiation accidents serves several useful purposes: 1) weaknesses in design, safety practices, training or control can be identified, and trends noted; 2) information regarding the medical consequences of injuries and the efficacy of treatment protocols is available to the treating physician; and 3) Registry case studies serve as valuable teaching tools. This presentation will review and summarize data on the US radiation accidents including their classification by device, accident circumstances, and frequency by respective states. Data regarding accidents with fatal outcomes will be reviewed. The inclusion of Registry data in the IAEA's International Reporting System of Radiation Events (RADEV) will also be discussed. (author)

  20. Report on behalf of the ''Commission mixte Paritaire'' commissioned to propose a text on the arrangements remaining in discussion and concerning the law project relative to the gas and electric power market and to the energy public utilities

    International Nuclear Information System (INIS)

    2002-12-01

    In the framework of the energy market opening, this document presents by a comparative table, the recommendations of the Senate and the National Assembly. After examination of this table, the ''Commission Paritaire'' elaborates a common text, presented in the second part of the document. (A.L.B.)

  1. Federal Energy Regulatory Commission (FERC) Regions

    Data.gov (United States)

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  2. The TS 600: automatic control system for eddy currents

    International Nuclear Information System (INIS)

    Poulet, J.P.

    1986-10-01

    In the scope of fabrication and in service inspection of the PWR steam generator tubing bendle, FRAMATOME developed an automatic Eddy Current testing system: TS600. Based on a mini-computer, TS600 allows to digitize, to store and to process data in various ways, so it is possible to perform several kinds of inspection: conventional inservice inspection, roll area profilometry...... TS600 can also be used to develop new methods of examination [fr

  3. Deliberation of the commission of electricity regulation relative to the definition of the modalities of allocation, for the year 2002, of the transfrontier transit capacities between France and Italy; Deliberation de la Commission de Regulation de l'Electricite relative a la definition des modalites d'attribution pour l'annee 2002 des capacites de transit transfrontalier entre la France et l'Italie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This regulatory text from the French commission of electricity regulation (CRE) defines the annual and secondary allocation of electricity transit capacity between France and Italy. Transit capacity allocations are jointly implemented by the French and Italian public network management authorities (RTE and GRTN, respectively). (J.S.)

  4. Discussion: European Commission policy

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  5. Report made on behalf of the commission of economic affairs, of environment and of the territory about the proposal of law, adopted by the Senate, relative to electricity and natural gas regulated tariffs

    International Nuclear Information System (INIS)

    2007-12-01

    This report aims at filling up some gaps in the French legislation relative to the determination of electricity and natural gas regulated tariffs and to the beneficiaries of these tariffs. It makes a synthesis of four proposals of law dealing with: the possibility for end-users and small companies to benefit again of the regulated electricity prices (proposals no 369 and 149), the permission of reversibility in the exercise of the rights relative to the eligibility for the purchase of electric power (proposal no 427), and the preservation of households' purchasing power by keeping up the regulated prices of electricity and natural gas (proposal no 462). The different articles are examined and some amendments are proposed by the commission. (J.S.)

  6. Identification and characterization of a Bacillus subtilis strain TS06 ...

    African Journals Online (AJOL)

    Replant disease is a major limitation for strawberry production in greenhouse. Bio-control may be a good way to cope with the replant diseases. Here, we report identification and characterization of a bacterial strain TS06 that may be used as a bio-control agent against the replant diseases in strawberry. TS06 was identified ...

  7. TS LOOP NON-POTABLE PUMP EVALUATION

    International Nuclear Information System (INIS)

    S. Goodin

    1999-01-01

    This analysis evaluates the existing subsurface non-potable water system from the portal pump to the end of the water line in the South Ramp and determines if the pump size and spacing meets the system pressure and flow requirements for construction operations and incipient fire fighting capability as established in the Subsurface Fire Hazards Analysis (CRWMS M andO 1998b). This analysis does not address the non potable water system in the Cross Drift which is covered under a previous design analysis (CRWMS-M andO 1998a). The Subsurface Fire Hazards Analysis references sections of OSHA 29 CFR 1910 Subpart L for requirements applicable to the incipient fire fighting hose stations used underground. This analysis does not address mechanical system valves, fittings, risers and other components of the system piping. This system is not designed or intended to meet all National Fire Protection Association (NFPA) codes for a fire fighting system but is only considered a backup system to fire extinguishers that are installed throughout the Topopah Springs (TS) Loop and may be used to fight small incipient stage fires

  8. LIDAR TS for ITER core plasma. Part II: simultaneous two wavelength LIDAR TS

    Science.gov (United States)

    Gowers, C.; Nielsen, P.; Salzmann, H.

    2017-12-01

    We have shown recently, and in more detail at this conference (Salzmann et al) that the LIDAR approach to ITER core TS measurements requires only two mirrors in the inaccessible port plug area of the machine. This leads to simplified and robust alignment, lower risk of mirror damage by plasma contamination and much simpler calibration, compared with the awkward and vulnerable optical geometry of the conventional imaging TS approach, currently under development by ITER. In the present work we have extended the simulation code used previously to include the case of launching two laser pulses, of different wavelengths, simultaneously in LIDAR geometry. The aim of this approach is to broaden the choice of lasers available for the diagnostic. In the simulation code it is assumed that two short duration (300 ps) laser pulses of different wavelengths, from an Nd:YAG laser are launched through the plasma simultaneously. The temperature and density profiles are deduced in the usual way but from the resulting combined scattered signals in the different spectral channels of the single spectrometer. The spectral response and quantum efficiencies of the detectors used in the simulation are taken from catalogue data for commercially available Hamamatsu MCP-PMTs. The response times, gateability and tolerance to stray light levels of this type of photomultiplier have already been demonstrated in the JET LIDAR system and give sufficient spatial resolution to meet the ITER specification. Here we present the new simulation results from the code. They demonstrate that when the detectors are combined with this two laser, LIDAR approach, the full range of the specified ITER core plasma Te and ne can be measured with sufficient accuracy. So, with commercially available detectors and a simple modification of a Nd:YAG laser similar to that currently being used in the design of the conventional ITER core TS design mentioned above, the ITER requirements can be met.

  9. Hybrid vehicle turbine engine technology support (HVTE-TS) project. 1995--1996 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This report presents a summary of technical work accomplished on the Hybrid Vehicle Turbine Engine--Technology Support (HVTE-TS) Project during calendar years 1995 and 1996. Work was performed under an initial National Aeronautics and Space Administration (NASA) contract DEN3-336. As of September 1996 the contract administration was transferred to the US Department of Energy (DoE) Chicago Operations Office, and renumbered as DE-AC02-96EE50553. The purpose of the HVTE-TS program is to develop gas turbine engine technology in support of DoE and automotive industry programs exploring the use of gas turbine generator sets in hybrid-electric automotive propulsion systems. The program focus is directed to the development of four key technologies to be applied to advanced turbogenerators for hybrid vehicles: Structural ceramic materials and processes; Low emissions combustion systems; Regenerators and seals systems; and Insulation systems and processes. 60 figs., 9 tabs.

  10. TS WEBSITE AND SOCIAL MEDIA ANALYTICS- DECEMBER 2016

    Data.gov (United States)

    Department of Veterans Affairs — This PowerPoint included accomplishments reached in December 2016, along with how many TS users and Pulse users there are currently. Not only does this PowerPoint...

  11. TS WEBSITE AND SOCIAL MEDIA ANALYTICS NOVEMBER 2016

    Data.gov (United States)

    Department of Veterans Affairs — This PowerPoint included accomplishments reached in November 2016, along with how many TS users and Pulse users there are currently. Not only does this PowerPoint...

  12. Electricity

    CERN Document Server

    Basford, Leslie

    2013-01-01

    Electricity Made Simple covers the fundamental principles underlying every aspect of electricity. The book discusses current; resistance including its measurement, Kirchhoff's laws, and resistors; electroheat, electromagnetics and electrochemistry; and the motor and generator effects of electromagnetic forces. The text also describes alternating current, circuits and inductors, alternating current circuits, and a.c. generators and motors. Other methods of generating electromagnetic forces are also considered. The book is useful for electrical engineering students.

  13. Operation and consolidation: lifetime of equipment and priorities TS

    CERN Document Server

    Béjar-Alonso, Isabel

    2008-01-01

    Since 1999 the TS department has benchmarked his services with the industry and other research laboratories and has prepared several consolidation plans. An evaluation of the results obtained from the different consolidation plans will be summarized. The difference between the projects achieved and those planned will be analyzed. The impact of the differed consolidation and of the maintenance backlog will be analyzed in order to present the future TS consolidation strategy

  14. The structural representation and properties of mutually incommensurate composite crystal (BiS)xTS2 (T=Ti, V, Nb and Ta)

    International Nuclear Information System (INIS)

    Gotoh, Y.; Fujihisa, H.; Takeya, S.; Yamaguchi, I.

    2006-01-01

    The structural representation of mutually incommensurate composite crystal, (BiS) x TS 2 (T=Ti, V, Nb and Ta), with layered substructures has been described by superspace group approach. The incommensurate composite structures of (BiS) x TS 2 have been successfully characterized by the single-crystal X-ray-diffraction method. Temperature dependences of in-plane electrical resistivity of single composite crystals of (BiS) x TS 2 have been obtained by a standard d.c. four probe method in the range of 1.7-300 K. It has been found that the electronic transport properties of (BiS) x TS 2 compounds show metallic behavior below room temperature. (copyright 2006 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim) (Abstract Copyright [2006], Wiley Periodicals, Inc.)

  15. TS Fuzzy Model-Based Controller Design for a Class of Nonlinear Systems Including Nonsmooth Functions

    DEFF Research Database (Denmark)

    Vafamand, Navid; Asemani, Mohammad Hassan; Khayatiyan, Alireza

    2018-01-01

    This paper proposes a novel robust controller design for a class of nonlinear systems including hard nonlinearity functions. The proposed approach is based on Takagi-Sugeno (TS) fuzzy modeling, nonquadratic Lyapunov function, and nonparallel distributed compensation scheme. In this paper, a novel...... criterion, new robust controller design conditions in terms of linear matrix inequalities are derived. Three practical case studies, electric power steering system, a helicopter model and servo-mechanical system, are presented to demonstrate the importance of such class of nonlinear systems comprising...

  16. [Construction of a system for proper TS-1 application].

    Science.gov (United States)

    Azuma, Sayaka; Morimoto, Shigefumi; Kagawa, Kunihiko; Katada, Yoshinori; Hasegawa, Kenji; Tabuse, Katsuyoshi

    2010-03-01

    TS-1 is an oral anti-tumor drug, which contains 5-chloro-2, 4-dihydroxypyridine (CDHP), a compound mainly excreted in urine. Since the CDHP concentration is increased among patients with impaired renal function, the frequency of side effects of TS-1 increases in such patients. Therefore, we constructed a computer-aided system that enables prompt monitoring of creatinine clearance (Ccr) calculated from the serum creatinine levels of patients prescribed TS-1 at the time pharmacists prepare the medicine. With this system, we found two cases who were prescribed TS-1, despite their decreased Ccr. One was a patient whose estimated Ccr was less than 30 mL/min/m2. With such renal malfunction, pharmacokinetics of the drug was considerably changed compared with normal control, and the dosage should be reduced. The other case presented with severe jaundice and had only a mild decrease of renal function (Ccr: 50 mL/min/m2). So we measured the concentration of uracil in the urine and performed a drug lymphocyte stimulation test for further investigation of concomitant affecting factors. Our system is useful because it can show pharmacists both the dosage TS-1 patients take and their renal function at a glance in real time. This system can be adapted for every medicine which might accumulate in patients with renal dysfunction.

  17. Cell cycle phase dependent emergence of thymidylate synthase studied by monoclonal antibody (M-TS-4).

    Science.gov (United States)

    Shibui, S; Hoshino, T; Iwasaki, K; Nomura, K; Jastreboff, M M

    1989-05-01

    A method of identifying thymidylate synthase (TS) at the cellular level was developed using anti-TS monoclonal antibody (M-TS-4), a monoclonal antibody created against purified TS from a HeLa cell line. In HeLa cells and four human glioma cell lines (U-251, U-87, 343-MGA, and SF-188), TS was identified primarily in the cytoplasm. Autoradiographic and flow cytometric studies showed that TS appeared mainly in the G1 phase and subsided early in the S phase; thus, the G1 phase can be divided into TS-positive and -negative fractions. Nuclear TS was not demonstrated unequivocally with M-TS-4, and the relationship between nuclear TS and DNA synthesis could not be determined. Although the percentage of TS-positive cells was larger than the S-phase fraction measured by autoradiography after a pulse of tritiated thymidine or by the immunoperoxidase method using BUdR, the ratios were within a similar range (1.2-1.4) in all cell lines studied. Therefore, the S-phase fraction can be estimated indirectly from the percentage of TS-positive cells measured by M-TS-4. Because the emergence of TS detected by our method is cell cycle dependent, M-TS-4 may be useful for biochemical studies of TS and for cytokinetic analysis.

  18. Kunstisuvi 1999 / Sirje Eelma, Rait Prääts

    Index Scriptorium Estoniae

    Eelma, Sirje, 1950-

    1999-01-01

    12. juunist näitus "Rahvusvaheline väikegraafika ja eesti väikeskulptuur" Kuressaare Raegaleriis. Koostajad ja kujundajad Sirje Eelma, Terje Ojaver. 19. juunist Haapsalu Linnagaleriis ja lisaruumides väljapanek "Motiiv". Koostajad Agur Kruusing, Sirje Eelma, Rait Prääts, kujundaja Agur Kruusing. Pärnu Linnagaleriis näitus "Minimaal". Koostaja ja kujundaja Rait Prääts. Muuseumiaidas eesti noorema kunsti väljapanek "Voolab". Koostaja Karol Kallas. Juuli lõpul Selgase dolomiidipäevad Kuressaares. Pärast põhinäituste lõppemist valiknäitus Paide Vallitornis

  19. Electricity your common sense guide

    CERN Document Server

    Ilich, Nick

    2015-01-01

    At last, a book that explains electricity in a very simple and easy way for everyone to understand. You will learn the basics of electricity, power to your home, receptacles, neutral and grounding, extension cord "Do's" and "Don'ts" and electrical shock.The book ends with safety tips and suggestions for you to stay safe and be shock free.

  20. Electricity

    International Nuclear Information System (INIS)

    Tombs, F.

    1983-01-01

    The subject is discussed, with particular reference to the electricity industry in the United Kingdom, under the headings; importance and scope of the industry's work; future fuel supplies (estimated indigenous fossil fuels reserves); outlook for UK energy supplies; problems of future generating capacity and fuel mix (energy policy; construction programme; economics and pricing; contribution of nuclear power - thermal and fast reactors; problems of conversion of oil-burning to coal-burning plant). (U.K.)

  1. Emotion of Physiological Signals Classification Based on TS Feature Selection

    Institute of Scientific and Technical Information of China (English)

    Wang Yujing; Mo Jianlin

    2015-01-01

    This paper propose a method of TS-MLP about emotion recognition of physiological signal.It can recognize emotion successfully by Tabu search which selects features of emotion’s physiological signals and multilayer perceptron that is used to classify emotion.Simulation shows that it has achieved good emotion classification performance.

  2. TS-05: 150 lines of java with high architectural complexity

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    2005-01-01

    In the short time span available in a software architecture course, it is difficult to find a software system that is both interesting from an architectural perspective and so small that it does not overwhelm the students.We present TS-05 which is a bare 150 line Java "toy-system" that never...

  3. Enhanced catalytic oxidation by hierarchically structured TS-1 zeolite

    NARCIS (Netherlands)

    Xin, H.; Zhao, Jiao; Zhao, J.; Xu, S.; Li, Junping; Zhang, Weiping; Guo, X.; Hensen, E.J.M.; Yang, Q.; Li, Can

    2010-01-01

    A TS-1 zeolite with a disordered network of mesopores penetrating the microporous crystalline zeolite framework was successfully synthesized by a one-pot carbon hard-templating synthesis approach. Besides conventional methods to characterize the mesoporosity, the use of variable-temperature 129Xe

  4. Move of Purchasing Offices TS – AB* – AT*

    CERN Multimedia

    FI Department

    2008-01-01

    The TS – AB* - AT* Purchasing Offices and the Purchasing Pool have moved to Building 5 – 2nd and *3rd floors. The phone and fax numbers are unchanged. We apologize for any inconvenience caused by the move. Thank you for your understanding. Finance Department – Purchasing Service.

  5. Theatrical Style and the Work of T.S. Eliot.

    Science.gov (United States)

    Harris, Warren Meredith

    This study examines T.S. Eliot's intentions for the staging of his plays, as revealed in the texts themselves and in related documents. His plays reflect his basically naturalistic conception of the stage environment and the acting; two of the plays, "Sweeney Agonistes," which was unfinished, and "The Family Reunion," demonstrate his inability to…

  6. Energy strategy and corporate planning: notes by the Department of Energy, Coal, Gas and Electricity Industries. Energy Commission paper number 15

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    NCB's aim is the implementation of 'Plan for Coal' and the financial objective is to break even each year. BGC aims to supply premium contract markets and so conserve resources. Gas supplies from the Brent Field will replace the deleted supplies from the Southern Basin. The electricity industry expects demand to increase by 2.7% pa reaching 52GW in 1984/5 which can be met by existing stations and those on order, they propose to order one AGR in addition to this. Appliance marketing activities will be increased.

  7. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  8. Report made on behalf of the commission of economic affairs, of environment and of the territory about the proposal of law, adopted by the Senate, relative to electricity and natural gas regulated tariffs; Rapport fait au nom de la Commission des Affaires Economiques, de l'Environnement et du Territoire sur la proposition de loi, adoptee par le Senat, relative aux tarifs reglementes d'electricite et de gaz naturel (n.238)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-12-15

    This report aims at filling up some gaps in the French legislation relative to the determination of electricity and natural gas regulated tariffs and to the beneficiaries of these tariffs. It makes a synthesis of four proposals of law dealing with: the possibility for end-users and small companies to benefit again of the regulated electricity prices (proposals no 369 and 149), the permission of reversibility in the exercise of the rights relative to the eligibility for the purchase of electric power (proposal no 427), and the preservation of households' purchasing power by keeping up the regulated prices of electricity and natural gas (proposal no 462). The different articles are examined and some amendments are proposed by the commission. (J.S.)

  9. Progress on MOD/RABiTS{sup TM} 2G HTS wire

    Energy Technology Data Exchange (ETDEWEB)

    Rupich, M.W.; Zhang, W.; Li, X.; Kodenkandath, T.; Verebelyi, D.T.; Schoop, U.; Thieme, C.; Teplitsky, M.; Lynch, J.; Nguyen, N.; Siegal, E.; Scudiere, J.; Maroni, V.; Venkataraman, K.; Miller, D.; Holesinger, T.G

    2004-10-01

    The development of the second generation (2G) high temperature superconducting wire has advanced beyond initial laboratory demonstrations and is now focused on developing and testing high critical current conductor designs required for commercial applications. The approach pursued at American Superconductor for 2G wire manufacturing is based on the combination of the RABiTS{sup TM} substrate-buffer technology with metal organic deposition (MOD) of the YBCO layer. This MOD/RABiTS{sup TM} approach has been demonstrated in 10 m lengths with critical currents of up to 184 A/cm-width ({approx}2.3 MA/cm{sup 2}) and in short length with critical currents of up to 270 A/cm-width ({approx}3.4 MA/cm{sup 2}). In addition to a high critical current, the superconducting wire must also meet stringent mechanical and electrical stability requirements that vary by application. Commercially viable architectures designed to meet these specifications have been fabricated and tested. Wires manufactured by this process have been successfully tested in prototype cable and coil applications.

  10. Automotive standard ISO/TS 16949 as a quality determinant

    Directory of Open Access Journals (Sweden)

    Joanna Rosak-Szyrocka

    2016-03-01

    Full Text Available The main aim of this paper is to present the standard ISO/TS 16949. In the modern world of competition, quality is one of the most important factors. Modern organizations should gamble on quality, regardless of the type of business, because it is the basic form of running a business effectively. It is not only a factor of market success, but also an indication of organizational culture.

  11. Electromagnetic noise spectrum at John TS [transmission station

    International Nuclear Information System (INIS)

    Hatanaka, G.K.

    1992-01-01

    Canadian National (CN) is proposing the development of a commercial office tower on a site directly south of John Transmission Station (TS). CN is concerned about the potential effects of fields originating from John TS and other nearby sources on the operation of sensitive equipment and occupants of the building. Potential equipment and tenants might include data processing equipment and television and radio broadcasting companies. A study was conducted to characterize the severity of the electromagnetic environment at the site in order to address these concerns. Measurements of the electromagnetic spectrum from 100 kHz to 300 MHz were performed from a mobile test facility that features a 5 kW diesel generator and an extendible antenna mast. Peak measurements were made using a selectable measurement time of 0.05 s. It was found that the highest noise levels result from micro-gap discharges under dry weather conditions. The micro-gap discharges are characteristic of defect noise sources associated with substation hardware. At 0.5 MHz the noise levels are typical of median noise levels expected for the International Radio Consultive Committee (CCIR) defined business environment. At 74 MHz the noise levels are more severe than the expected levels for this type of environment. However, levels more representative of the business environment will be achieved by eliminating the micro-gap noise sources attributed to John TS. 6 refs., 11 figs., 2 tabs

  12. Measurement of the CKM matrix element |V_ts

    CERN Document Server

    Unverdorben, Christopher Gerhard

    This is the first direct measurement of the CKM matrix element |V_ts|, using data collected by the ATLAS detector in 2012 at √s=8 TeV pp-collisions with a total integrated luminosity of 20.3 fb⁻¹. The analysis is based on 112171 reconstructed tt̅ candidate events in the lepton+jets channel, having a purity of 90.0 %. 183 tt̅→WWbs̅ decays are expected (charge conjugation implied), which are available for the extraction of the CKM matrix element |V_ts|². To identify these rare decays, several observables are examined, such as the properties of jets, tracks and of b-quark identification algorithms. Furthermore, the s-quark hadrons K0s are considered, reconstructed by a kinematic fit. The best observables are combined in a multivariate analysis, called "boosted decision trees". The responses from Monte Carlo simulations are used as templates for a fit to data events yielding a significance value of 0.7σ for t→s+W decays. An upper limit of |V_ts|² < 1.74 % at 95 % confidence level is set, includi...

  13. A Comparison of Tropical Storm (TS) and Non-TS Gust Factors for Assessing Peak Wind Probabilities at the Eastern Range

    Science.gov (United States)

    Merceret, Francis J.; Crawford, Winifred C.

    2010-01-01

    Peak wind speed is an important forecast element to ensure the safety of personnel and flight hardware at Kennedy Space Center (KSC) and the Cape Canaveral Air Force Station (CCAFS) in East-Central Florida. The 45th Weather Squadron (45 WS), the organization that issues forecasts for the KSC/CCAFS area, finds that peak winds are more difficult to forecast than mean winds. This difficulty motivated the 45 WS to request two independent studies. The first (Merceret 2009) was the development of a reliable model for gust factors (GF) relating the peak to the mean wind speed in tropical storms (TS). The second (Lambert et al. 2008) was a climatological study of non-TS cool season (October-April) mean and peak wind speeds by the Applied Meteorology Unit (AMU; Bauman et al. 2004) without the use of GF. Both studies presented their statistics as functions of mean wind speed and height. Most of the few comparisons of TS and non-TS GF in the literature suggest that non-TS GF at a given height and mean wind speed are smaller than the corresponding TS GF. The investigation reported here converted the non-TS peak wind statistics calculated by the AMU to the equivalent GF statistics and compared them with the previous TS GF results. The advantage of this effort over all previously reported studies of its kind is that the TS and non-TS data were taken from the same towers in the same locations. This eliminates differing surface attributes, including roughness length and thermal properties, as a major source of variance in the comparison. The goal of this study is two-fold: to determine the relationship between the non-TS and TS GF and their standard deviations (GFSD) and to determine if models similar to those developed for TS data in Merceret (2009) could be developed for the non-TS environment. The results are consistent with the literature, but include much more detailed, quantitative information on the nature of the relationship between TS and non-TS GF and GFSD as a function

  14. Report on the behalf of the Foreign Affair Commission on the bill project adopted by the Senate, authorizing the approval of the convention between the Government of the French Republic and the Government of the Monaco Principality related to the supply of electricity to the Monaco Principality - Nr 4171

    International Nuclear Information System (INIS)

    Bouvard, Loic

    2012-01-01

    This document outlines that, according to the convention, electricity tariffs are the same for Monaco inhabitants and for French consumers since 1951, and that the new convention leaves this situation unchanged. A second part comments the relationship between France and Monaco in the domain of energy. The content of the Commission debate is reported

  15. Advice presented on behalf of the commission of finances, economy and plan about the law project (no. 1613) relative to the electric and gas public utilities and to the power and gas companies; Avis presente au nom de la Commission des finances, de l'economie generale et du plan sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Carayon, B.

    2004-06-01

    The aim of this report is to present to the French deputies the advice of the commission of finances and economy about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions and comments made by the commission about the law project while the second part concerns the detailed analysis of the articles 16 and 22 about the pension funds of EdF and GdF agents and the change of the status of both utilities. The amendments adopted by the commission for these articles conclude the report. (J.S.)

  16. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  17. Reconstitution of Qbeta RNA replicase from a covalently bonded elongation factor Tu-Ts complex

    DEFF Research Database (Denmark)

    Brown, S; Blumenthal, T

    1976-01-01

    of these polypeptides, protein synthesis elongation factors EF-Tu and EF-Ts, can be covalently crosslinked with dimethyl suberimidate to form a complex which lacks the ability to catalyze the known host functions catalyzed by the individual elongation factors. Using a previously developed reconstitution system we have...... examined the effects of crosslinking the EF-Tu-Ts complex on reconstituted replicase activity. Renaturation is significantly more efficient when exogenously added native EF-Tu-Ts is crosslinked than when it is not. Crosslinked EF-Tu-Ts can be purified from a crude crosslinked postribosomal supernatant...... by its ability to replace EF-Tu and EF-Ts in the renaturation of denatured Qbeta replicase. A sample of Qbeta replicase with crosslinked EF-Tu-Ts replacing the individual elongation factors was prepared. Although it lacked EF-Tu and EF-Ts activities, it could initiate transcription of both poly...

  18. Adrenalectomy for Cushing's syndrome: do's and don'ts.

    Science.gov (United States)

    Paduraru, D N; Nica, A; Carsote, M; Valea, A

    2016-01-01

    Aim. To present specific aspects of adrenalectomy for Cushing's syndrome (CS) by introducing well established aspects ("do's") and less known aspects ("don'ts"). Material and Method. This is a narrative review. Results. The "do's" for laparoscopic adrenalectomy (LA) are the following: it represents the "gold standard" for secretor and non-secretor adrenal tumors and the first line therapy for CS with an improvement of cardio-metabolic co-morbidities; the success rate depending on the adequate patients' selection and the surgeon's skills. The "don'ts" are large (>6-8 centimeters), locally invasive, malignant tumors requiring open adrenalectomy (OA). Robotic adrenalectomy is a new alternative for LA, with similar safety and conversion rate and lower pain drugs use. The "don'ts" are the following: lack of randomized controlled studies including oncologic outcome, different availability at surgical centers. Related to the sub-types of CS, the "do's" are the following: adrenal adenomas which are cured by LA, while adrenocortical carcinoma (ACC) requires adrenalectomy as first line therapy and adjuvant mitotane therapy; synchronous bilateral adrenalectomy (SBA) is useful for Cushing's disease (only cases refractory to pituitary targeted therapy), for ectopic Cushing's syndrome (cases with unknown or inoperable primary site), and for bilateral cortisol producing adenomas. The less established aspects are the following: criteria of skilled surgeon to approach ACC; the timing of surgery in subclinical CS; the need for adrenal vein catheterization (which is not available in many centers) to avoid unnecessary SBA. Conclusion. Adrenalectomy for CS is a dynamic domain; LA overstepped the former OA area. The future will improve the knowledge related to RA while the cutting edge is represented by a specific frame of intervention in SCS, children and pregnant women. Abbreviations: ACC = adrenocortical carcinoma, ACTH = Adrenocorticotropic Hormone, CD = Cushing's disease, CS

  19. Distribution electric system simulator to support decision-making for CFE (Federal Electric Commission) Distribution Control Centers; Simulador del Sistema Electrico de Distribucion para apoyo en la toma de decisiones en Centros de Control de Distribucion de la CFE

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa Reza, Alfredo; Quintero Reyes, Agustin; Garcia Mendoza, Raul; Calleros Torres, Tito Manuel [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Borjas Diaz, Jesus Fidel; Sierra Rodriguez, Benjamin; Torres Abrego, Rafael [Comision Federal de Electricidad (Mexico)

    2011-07-01

    This article presents the physical, logical and functional architecture designed to integrate the Electric Distribution System (EDS) simulator developed for the CFE and the electric energy Distribution Control Centers in Mexico. The objective of the EDS simulator is to integrate engineering distribution functions (power flow, short circuit, optimal reconfiguration and reliability, among others) and an expert system (Case-based Reasoning) to aid the process of information analysis, decision-making and the capacity-building of the CFE's Regional and Zonal Distribution Control Centers. The EDS simulator has been installed, updated and is operational in the Tampico Zone and the Gulf Division Distribution Center, as an established product that continually evolves along with the actual operating dynamics. [Spanish] Se presenta la arquitectura fisica, logica y funcional disenada para integrar el simulador del Sistema Electrico de Distribucion (SED) desarrollado para la Comision Federal de Electricidad (CFE) y los Centros de Control de Distribucion de energia electrica en Mexico. El objetivo del simulador del SED es integrar funciones de ingenieria de distribucion (flujo de potencia, corto circuito, reconfiguracion optima, confiabilidad, entre otras) y un sistema experto (Razonamiento Basado en Casos) para apoyar el proceso de analisis de informacion, la toma de decisiones y la capacitacion en los Centros de Control de Distribucion Zonales y Regionales de CFE. El Simulador del SED se encuentra instalado, actualizado y en operacion en la Zona Tampico y en la Division de Distribucion Golfo Centro como un producto consolidado y en constante evolucion a la par de la dinamica operativa real.

  20. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  1. CaTs Lab (CHAOS and Thermal Sciences Laboratory)

    Science.gov (United States)

    Teate, Anthony A.

    2002-01-01

    The CHAOS and Thermal Sciences Laboratory (CaTs) at James Madison University evolved into a noteworthy effort to increase minority representation in the sciences and mathematics. Serving ten students and faculty directly, and nearly 50 students indirectly, CaTs, through recruitment efforts, workshops, mentoring programs, tutorial services and research and computational laboratories, fulfilled its intent to initiate an academically enriched research program aimed at strengthening the academic and self-actualization skills of undergraduate students with potential to pursue doctoral study in the sciences. The stated goal of the program was to increase by 5% the number of enrolled mathematics and science students into the program. Success far exceeded the program goals by producing 100% graduation rate of all supported recipients during its tenure, with 30% of the students subsequently in pursuit of graduate degrees. Student retention in the program exceeded 90% and faculty participation exceeded the three members involved in mentoring and tutoring, gaining multi-disciplinary support. Aggressive marketing of the program resulted in several paid summer internships and commitments from NASA and an ongoing relationship with CHROME, a nationally recognized organization which focuses on developing minority students in the sciences and mathematics. Success of the program was only limited by the limited fiscal resources at NASA which resulted in phasing out of the program.

  2. CATALYTIC PERFORMANCES OF Fe2O3/TS-1 CATALYST IN PHENOL HYDROXYLATION REACTION

    Directory of Open Access Journals (Sweden)

    Didik Prasetyoko

    2010-07-01

    Full Text Available Hydroxylation reaction of phenol into diphenol, such as hydroquinone and catechol, has a great role in many industrial applications. Phenol hydroxylation reaction can be carried out using Titanium Silicalite-1 (TS-1 as catalyst and H2O2 as an oxidant. TS-1 catalyst shows high activity and selectivity for phenol hydroxylation reaction. However, its hydrophobic sites lead to slow H2O2 adsorption toward the active site of TS-1. Consequently, the reaction rate of phenol hydroxylation reaction is tends to be low. Addition of metal oxide Fe2O3 enhanced hydrophilicity of TS-1 catalyst. Liquid phase catalytic phenol hydroxylation using hydrogen peroxide as oxidant was carried out over iron (III oxide-modified TS-1 catalyst (Fe2O3/TS-1, that were prepared by impregnation method using iron (III nitrate as precursor and characterized by X-ray diffraction, infrared spectroscopy, nitrogen adsorption, pyridine adsorption, and hydrophilicity techniques. Catalysts 1Fe2O3/TS-1 showed maximum catalytic activity of hydroquinone product. In this research, the increase of hydroquinone formation rate is due to the higher hydrophilicity of Fe2O3/TS-1 catalysts compare to the parent catalyst, TS-1.   Keywords: Fe2O3/TS-1, hydrophilic site, phenol hydroxylation

  3. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  4. SAS4A and FPIN2X validation for slow ramp TOP accidents: experiments TS-1 and TS-2

    International Nuclear Information System (INIS)

    Hill, D.J.

    1986-01-01

    The purpose of this paper is to present further results in the series of experimental analyses being performed using SAS4A and FPIN2X in order to provide a systematic validation of these codes. The two experiments discussed here, TS-1 and TS-2, were performed by Westinghouse Hanford/Hanford Engineering Development Laboratory (WHC/HEDL) in the Transient Reactor Test (TREAT) Facility. They were slow ramp transient overpowers (TOPs) of ∼ 5 cent/s equivalent Fast Flux Test Facility (FFTF) ramp rate, single-pin experiments in flowing sodium loops. The good agreement found here adds significantly to the experimental data base that provides the foundation for SAS4A and FPIN2X validation. It also shows that prefailure internal fuel motion is a phenomenon that has to be correctly accounted for, not only as a potential inherent safety mechanism, but also before any accurate prediction of fuel failure and subsequent fuel motion and the associated reactivity effects can be made. This is also true for metal-fueled pins. This capability is provided by PINACLE, which is being incorporated into SAS4A

  5. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  6. LIDAR TS for ITER core plasma. Part I: layout & hardware

    Science.gov (United States)

    Salzmann, H.; Gowers, C.; Nielsen, P.

    2017-12-01

    The original time-of-flight design of the Thomson scattering diagnostic for the ITER core plasma has been shown up by ITER. This decision was justified by insufficiencies of some of the components. In this paper we show that with available, present day technology a LIDAR TS system is feasible which meets all the ITER specifications. As opposed to the conventional TS system the LIDAR TS also measures the high field side of the plasma. The optical layout of the front end has been changed only little in comparison with the latest one considered by ITER. The main change is that it offers an optical collection without any vignetting over the low field side. The throughput of the system is defined only by the size and the angle of acceptance of the detectors. This, in combination with the fact that the LIDAR system uses only one set of spectral channels for the whole line of sight, means that no absolute calibration using Raman or Rayleigh scattering from a non-hydrogen isotope gas fill of the vessel is needed. Alignment of the system is easy since the collection optics view the footprint of the laser on the inner wall. In the described design we use, simultaneously, two different wavelength pulses from a Nd:YAG laser system. Its fundamental wavelength ensures measurements of 2 keV up to more than 40 keV, whereas the injection of the second harmonic enables measurements of low temperatures. As it is the purpose of this paper to show the technological feasibility of the LIDAR system, the hardware is considered in Part I of the paper. In Part II we demonstrate by numerical simulations that the accuracy of the measurements as required by ITER is maintained throughout the given plasma parameter range. The effect of enhanced background radiation in the wavelength range 400 nm-500 nm is considered. In Part III the recovery of calibration in case of changing spectral transmission of the front end is treated. We also investigate how to improve the spatial resolution at the

  7. European commission report on market opening

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    Governments must step up their effort to implement measures relating to market opening within the framework of the directives on gas and electricity. Only greater integration of national markets will produce the improvements required from a competitive point of view on the domestic energy market. These are the main conclusions of the annual report on domestic electricity and gas market operation adopted by the European Commission at the beginning of January 2005. (author)

  8. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  9. Comparative genomic analysis reveals a novel mitochondrial isoform of human rTS protein and unusual phylogenetic distribution of the rTS gene

    Science.gov (United States)

    Liang, Ping; Nair, Jayakumar R; Song, Lei; McGuire, John J; Dolnick, Bruce J

    2005-01-01

    Background The rTS gene (ENOSF1), first identified in Homo sapiens as a gene complementary to the thymidylate synthase (TYMS) mRNA, is known to encode two protein isoforms, rTSα and rTSβ. The rTSβ isoform appears to be an enzyme responsible for the synthesis of signaling molecules involved in the down-regulation of thymidylate synthase, but the exact cellular functions of rTS genes are largely unknown. Results Through comparative genomic sequence analysis, we predicted the existence of a novel protein isoform, rTS, which has a 27 residue longer N-terminus by virtue of utilizing an alternative start codon located upstream of the start codon in rTSβ. We observed that a similar extended N-terminus could be predicted in all rTS genes for which genomic sequences are available and the extended regions are conserved from bacteria to human. Therefore, we reasoned that the protein with the extended N-terminus might represent an ancestral form of the rTS protein. Sequence analysis strongly predicts a mitochondrial signal sequence in the extended N-terminal of human rTSγ, which is absent in rTSβ. We confirmed the existence of rTS in human mitochondria experimentally by demonstrating the presence of both rTSγ and rTSβ proteins in mitochondria isolated by subcellular fractionation. In addition, our comprehensive analysis of rTS orthologous sequences reveals an unusual phylogenetic distribution of this gene, which suggests the occurrence of one or more horizontal gene transfer events. Conclusion The presence of two rTS isoforms in mitochondria suggests that the rTS signaling pathway may be active within mitochondria. Our report also presents an example of identifying novel protein isoforms and for improving gene annotation through comparative genomic analysis. PMID:16162288

  10. Comparative genomic analysis reveals a novel mitochondrial isoform of human rTS protein and unusual phylogenetic distribution of the rTS gene

    Directory of Open Access Journals (Sweden)

    McGuire John J

    2005-09-01

    Full Text Available Abstract Background The rTS gene (ENOSF1, first identified in Homo sapiens as a gene complementary to the thymidylate synthase (TYMS mRNA, is known to encode two protein isoforms, rTSα and rTSβ. The rTSβ isoform appears to be an enzyme responsible for the synthesis of signaling molecules involved in the down-regulation of thymidylate synthase, but the exact cellular functions of rTS genes are largely unknown. Results Through comparative genomic sequence analysis, we predicted the existence of a novel protein isoform, rTS, which has a 27 residue longer N-terminus by virtue of utilizing an alternative start codon located upstream of the start codon in rTSβ. We observed that a similar extended N-terminus could be predicted in all rTS genes for which genomic sequences are available and the extended regions are conserved from bacteria to human. Therefore, we reasoned that the protein with the extended N-terminus might represent an ancestral form of the rTS protein. Sequence analysis strongly predicts a mitochondrial signal sequence in the extended N-terminal of human rTSγ, which is absent in rTSβ. We confirmed the existence of rTS in human mitochondria experimentally by demonstrating the presence of both rTSγ and rTSβ proteins in mitochondria isolated by subcellular fractionation. In addition, our comprehensive analysis of rTS orthologous sequences reveals an unusual phylogenetic distribution of this gene, which suggests the occurrence of one or more horizontal gene transfer events. Conclusion The presence of two rTS isoforms in mitochondria suggests that the rTS signaling pathway may be active within mitochondria. Our report also presents an example of identifying novel protein isoforms and for improving gene annotation through comparative genomic analysis.

  11. Report made on behalf of the commission of economic affairs, environment and territory about the law project (no. 1613), relative to the electric and gas public utilities and to the power and gas companies; Rapport fait au nom de la Commission des affaires economiques, de l'environnement et du territoire sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Lenoir, J.C.

    2004-06-01

    The aim of this report is to present to the French deputies the comments made by the commission of economic affairs, environment and territory about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions about the law project while the second part makes a detailed analysis of each article with some proposals of modifications. A comparative table puts in parallel the existing texts, the law project and the proposals made by the commission. (J.S.)

  12. Positron identification by TRDs in TS93 and PAMELA experiments

    International Nuclear Information System (INIS)

    Bellotti, R.; Cafagna, F.; Castellano, M.; Circella, M.; De Marzo, C.; De Cataldo, G.; Giglietto, N.; Marangelli, B.; Raino, A.; Spinelli, P.

    1997-01-01

    We are involved in a program to study the antimatter components of the cosmic rays in outer space. We present the performances of a transition radiation detector we have built for positron identification during a balloon flight in 1993. The flight (TS93) was dedicated to the measurement of the positron spectrum in the energy range 4-50 GeV. We present also the design and expected performances of a similar detector we intend to build for a future experiment (PAMELA), to be run on a satellite by the end of 1999, in order to complete this program with higher statistics and at higher energies, namely about 200 GeV. (orig.)

  13. Intermittent magnetic reconnection in TS-3 merging experiment

    International Nuclear Information System (INIS)

    Ono, Y.; Hayashi, Y.; Ii, T.; Tanabe, H.; Ito, S.; Kuwahata, A.; Ito, T.; Kamino, Y.; Yamada, T.; Inomoto, M.

    2011-01-01

    Ejection of current sheet with plasma mass causes impulsive and intermittent magnetic reconnection in the TS-3 spherical tokamak (ST) merging experiment. Under high guide toroidal field, the sheet resistivity is almost classical due to the sheet thickness much longer than the ion gyroradius. Large inflow flux and low current-sheet resistivity result in flux and plasma pileup followed by rapid growth of the current sheet. When the pileup exceeds a critical limit, the sheet is ejected mechanically from the squeezed X-point area. The reconnection (outflow) speed is slow during the flux/plasma pileup and is fast during the ejection, suggesting that intermittent reconnection similar to the solar flare increases the averaged reconnection speed. These transient effects enable the merging tokamaks to have the fast reconnection as well as the high-power reconnection heating, even when their current-sheet resistivity is low under high guide field.

  14. REAC/TS Radiation Accident Registry: An Overview

    Energy Technology Data Exchange (ETDEWEB)

    Doran M. Christensen, DO, REAC/TS Associate Director and Staff Physician Becky Murdock, REAC/TS Registry and Health Physics Technician

    2012-12-12

    Over the past four years, REAC/TS has presented a number of case reports from its Radiation Accident Registry. Victims of radiological or nuclear incidents must meet certain dose criteria for an incident to be categorized as an “accident” and be included in the registry. Although the greatest numbers of “accidents” in the United States that have been entered into the registry involve radiation devices, the greater percentage of serious accidents have involved sealed sources of one kind or another. But if one looks at the kinds of accident scenarios that have resulted in extreme consequence, i.e., death, the greater share of deaths has occurred in medical settings.

  15. ISO/TS 16949 system in quality aspect

    Directory of Open Access Journals (Sweden)

    Joanna Rosak-Szyrocka

    2014-12-01

    Full Text Available In the automotive industry the use of modern technology and provision of the highest quality product and related services is the most important element of rivalry between global corporations and motorcycles. In a competitive struggle for the recognition of its brand in the automotive market global organizations continuously raise the requirements for quality management systems, so that the finished product meets all the standards in terms of safety, quality and satisfying the ever-growing needs of customers - present and future drivers and passengers of cars. ISO/TS 16949 quality management system is presented in the paper. A framework for customer specific requirement as well as preventing problems is shown.

  16. Composite repairs qualification according to ISO/TS 24817

    Energy Technology Data Exchange (ETDEWEB)

    Meniconi, Luiz C.M.; Perrut, Valber A. [Petroleo Brasileiro S.A. (PETROBRAS/CENPES), Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2009-07-01

    Composite repairs for metallic pipes from three different suppliers were evaluated according to ISO Technical Specification TS 24817. The intended application scenarios are offshore production plants, but the design methodology is also applicable to onshore pipelines and pipework. The evaluation covered all the relevant mechanical properties and established the maximum application temperatures for each repair system. The tests also considered the application of composite repair sleeves to metallic pipes with through thickness defects, by measuring the strain energy release rates of the composite-metal interfaces. The test campaigns aimed to verify the applicability of the recently published ISO document, and to implement it as the routine procedure for composite repairs evaluation within PETROBRAS. The tests also addressed the influence of metallic pipe surface preparation on the final properties of the repair sleeves, especially in relation to the long term behavior of leaking pipes repaired by means of composite materials. (author)

  17. A Federated Capability-based Access Control Mechanism for Internet of Things (IoTs)

    OpenAIRE

    Xu, Ronghua; Chen, Yu; Blasch, Erik; Chen, Genshe

    2018-01-01

    The prevalence of Internet of Things (IoTs) allows heterogeneous embedded smart devices to collaboratively provide intelligent services with or without human intervention. While leveraging the large-scale IoT-based applications like Smart Gird and Smart Cities, IoT also incurs more concerns on privacy and security. Among the top security challenges that IoTs face is that access authorization is critical in resource and information protection over IoTs. Traditional access control approaches, l...

  18. Report made on behalf of the commission of economic affairs about the proposal of law aiming at authorizing the end-users to get back to the regulated power supply tariff, about the proposal of law aiming at authorizing the reversibility of the use of eligibility rights for the purchase of electric power, and about the proposal of law aiming at preserving the purchasing power of households by maintaining the regulated prices of electricity and natural gas

    International Nuclear Information System (INIS)

    2007-01-01

    This report concerns the examination of three proposals of law in relation with the regulated prices of electricity and gas. Since July 1, 2007, the French households can freely quit their historical energy supplier and subscribe to other suppliers with de-regulated energy prices. In front of the rise of free energy prices observed during the last years, some households who made the choice of free tariffs have encountered serious financial problems. For this reason, a law is proposed by the commission of economic affairs which aims at allowing the end-users to get back to the regulated tariffs of electricity and gas. (J.S.)

  19. Report on the behalf of the inquiry commission related to past, present and future costs of the nuclear sector, to the reactor exploitation duration, and to various economic and financial aspects of production and commercialization of nuclear electricity within the frame of the French and European electric mix, as well as to the consequences of the shutting down and dismantling of nuclear reactors, notably the Fessenheim power plant - Nr 2007

    International Nuclear Information System (INIS)

    Brottes, Francois; Baupin, Denis

    2014-01-01

    This official report first describes the role of nuclear energy in the European electric system: economic context (pricing mode, interconnection leading to a European price), similar situations and different policies in Germany, Belgium and UK. It proposes the contribution of the inquiry commission: a constrained energy transition, a shared diagnosis on the status of the European electric system but two possible solutions, nuclear as an economy on its own requiring a strong commitment of public authorities. The next part addresses the front end of the nuclear cycle, i.e. how to ensure the supply of the French nuclear fleet (world resources, demand-supply balance, weak relationship between uranium price and nuclear electricity price). The inquiry commission outlines and discusses the roles of AREVA for the front end, EDF which tries to be less vulnerable, and the State (EDF's regulator and Areva's support). The third part addresses the maintenance and subcontracting expenses: maintenance as a major challenge to control costs, subcontracting as a choice of industrial policy. The inquiry commission notices that EDF has not yet reached a full control of maintenance and that subcontracting remains a matter of controversy. The fourth part discusses the fleet evolution: entry in the fourth decade, a life extension project which requires safety improvement. The inquiry commission discusses the numerous uncertainties of the industrial project, outlines that the construction of a new fleet requires huge investments, that the future of the nuclear fleet requires a global approach, and that shutting down nuclear plants requires support. The fifth part discusses the correct assessment of the amount of future expenses and how to secure their funding: the main future expenses are those related to installation dismantling and to nuclear wastes. The inquiry commission outlines the uncertainties about this funding. The sixth chapter addresses reprocessing activities, MOX fuel and

  20. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  1. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  2. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  3. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Low intensity transcranial electric stimulation

    DEFF Research Database (Denmark)

    Antal, Andrea; Alekseichuk, I; Bikson, M

    2017-01-01

    Low intensity transcranial electrical stimulation (TES) in humans, encompassing transcranial direct current (tDCS), transcutaneous spinal Direct Current Stimulation (tsDCS), transcranial alternating current (tACS), and transcranial random noise (tRNS) stimulation or their combinations, appears...

  17. Precursor effect on the property and catalytic behavior of Fe-TS-1 in butadiene epoxidation

    Science.gov (United States)

    Wu, Mei; Zhao, Huahua; Yang, Jian; Zhao, Jun; Song, Huanling; Chou, Lingjun

    2017-11-01

    The effect of iron precursor on the property and catalytic behavior of iron modified titanium silicalite molecular sieve (Fe-TS-1) catalysts in butadiene selective epoxidation has been studied. Three Fe-TS-1 catalysts were prepared, using iron nitrate, iron chloride and iron sulfate as precursors, which played an important role in adjusting the textural properties and chemical states of TS-1. Of the prepared Fe-TS-1 catalysts, those modified by iron nitrate (FN-TS-1) exhibited a significant enhanced performance in butadiene selective epoxidation compared to those derived from iron sulfate (FS-TS-1) or iron chloride (FC-TS-1) precursors. To obtain a deep understanding of their structure-performance relationship, X-ray diffraction (XRD), X-ray photoelectron spectroscopy (XPS), Temperature programmed desorption of NH3 (NH3-TPD), Diffuse reflectance UV-Vis spectra (DR UV-Vis), Fourier transformed infrared spectra (FT-IR) and thermal gravimetric analysis (TGA) were conducted to characterize Fe-TS-1 catalysts. Experimental results indicated that textural structures and acid sites of modified catalysts as well as the type of Fe species influenced by the precursors were all responsible for the activity and product distribution.

  18. Evaluation of the egg transmission and pathogenicity of Mycoplasma gallisepticum isolates genotyped as ts-11.

    Science.gov (United States)

    Armour, Natalie K; Ferguson-Noel, Naola

    2015-01-01

    Live Mycoplasma gallisepticum vaccines are used for the control of respiratory disease, egg production losses and egg transmission associated with M. gallisepticum infection in long-lived poultry. The first field case of apparent increased virulence and vertical transmission of ts-11, a live M. gallisepticum vaccine, has been reported. In that study a M. gallisepticum isolate from the broiler progeny of ts-11-vaccinated breeders was genotyped as ts-11 by sequence analysis of four different genetic targets and Random Amplified Polymorphic DNA and found to be significantly more virulent than ts-11 vaccine. The objective of the current study was to evaluate the rate of egg transmission and pathogenicity of ts-11 vaccine and isolates recovered from ts-11-vaccinated breeders (K6222B) and their broiler progeny (K6216D) which had been genotyped as ts-11. Groups of 28-week-old specific pathogen-free chickens at 87% average weekly egg production were inoculated with sterile broth media (negative controls), ts-11 vaccine, K6222B, K6216D or R strain (positive controls) by eye-drop and aerosol. K6216D transmitted via the egg at an average rate of 4.0% in the third and fourth weeks post-infection, while egg transmission of K6222B and ts-11 vaccine was not detected. M. gallisepticum was isolated from the air sacs, ovaries and oviducts of hens infected with K6216D and K6222B, but not from those infected with ts-11 vaccine. K6216D and K6222B both induced respiratory signs and significantly more tracheal colonization and more severe tracheal and air sac lesions than ts-11 vaccine (P ≤ 0.05). There were no substantial differences in the egg production of ts-11, K6216D and K6222B infected groups. These results provide the first conclusive evidence of transovarian transmission of an isolate genotyped as ts-11 and indicate that isolates genotyed as ts-11 vary in their virulence and ability to transmit via the egg.

  19. A virtual computing infrastructure for TS-CV SCADA systems

    CERN Document Server

    Poulsen, S

    2008-01-01

    In modern data centres, it is an emerging trend to operate and manage computers as software components or logical resources and not as physical machines. This technique is known as â€ワvirtualisation” and the new computers are referred to as â€ワvirtual machines” (VMs). Multiple VMs can be consolidated on a single hardware platform and managed in ways that are not possible with physical machines. However, this is not yet widely practiced for control system deployment. In TS-CV, a collection of VMs or a â€ワvirtual infrastructure” is installed since 2005 for SCADA systems, PLC program development, and alarm transmission. This makes it possible to consolidate distributed, heterogeneous operating systems and applications on a limited number of standardised high-performance servers in the Central Control Room (CCR). More generally, virtualisation assists in offering continuous computing services for controls and maintaining performance and assuring quality. Implementing our systems in a vi...

  20. Ceļa servitūts

    OpenAIRE

    Livdāns, Dāvis

    2016-01-01

    Bakalaura darba tēma ir “Ceļa servitūts.” Bakalaura darba mērķis ir izpētīt ceļa servitūta nodibināšanas kārtību, iespējamās kļūdas, praksē nodibināto servitūtu problēmjautājumus un to risinājumus. Bakalaura darba tapšanas stadijā autors izmantoja zinātnisko literatūru, normatīvos aktus, kā arīi ar to tapšanu saistītos dokumentus un juridiskās prakses materiālus. Darbā ir apskatīti gan Civillikumā noteiktie servitūtu nodibināšanas pamati, gan citi iespējamie nodibināšanas pamati, pēc kā ir an...

  1. Antigenicity analysis of Vibrio harveyi TS-628 strain

    Institute of Scientific and Technical Information of China (English)

    QIN Yingxue; WANG Jun; WANG Shifeng; YAN Qingpi

    2007-01-01

    Vibrio harveyi,the major causative agent of vibriosis,affects a diverse range of marine cultured organisms over a wide geographical area.However,reports about screening the effective antigen and research on vaccines of V.harveyi are scarce.Flagellin,lipopolysaccharide (LPS) and outer membrane proteins (OMP) are major immunogenic antigens in many Gram-negative bacteria.In this study,the flagellin,OMP and LPS of the V.harveyi TS-628 strain isolated from infected groupers were extracted and Western blot analysis was used to detect the antigenicity of these extractions.Results of the Western blot assay reveal that there are four positive flagellin bands:35 kDa,38 kDa,43 kDa,and 52 kDa,of which the 43 kDa and 52 kDa bands displayed the strongest positive reaction.There are five positive OMP bands about 35 kDa,38 kDa,43 kDa,47 kDa,and 52 kDa,of which the 43 kDa appeared to have the strongest positive reaction although the other four proteins also displayed strong reactions.However,LPS is Western blot-negative.These results indicate that the 43 kDa and 52 kDa flagellin and OMP of size 43 kDa,52 kDa can be candidates for developing vaccines against V.harveyi.

  2. Report on behalf of the ''Commission mixte Paritaire'' commissioned to propose a text on the arrangements remaining in discussion and concerning the law project relative to the gas and electric power market and to the energy public utilities; Rapport au nom de la Commission mixte paritaire chargee de proposer un texte sur les dispositions restant en discussion du projet de loi relatif aux marches energetiques et au service public de l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-01

    In the framework of the energy market opening, this document presents by a comparative table, the recommendations of the Senate and the National Assembly. After examination of this table, the ''Commission Paritaire'' elaborates a common text, presented in the second part of the document. (A.L.B.)

  3. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  4. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  5. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  6. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  7. Scientific Communication for Positive Action: Do's and Don'ts

    Science.gov (United States)

    Sanquini, A.; Wood, M. M.

    2015-12-01

    Natural hazard presentations often highlight disasters that may ensue from natural processes when mitigation or preparedness actions are not taken. Examples include images of raging fires, collapsed buildings, and flooded urban areas. Research has shown that this makes presentations more interesting and more memorable. Such images are the stock and trade of disaster reporting by the media. Unfortunately, it may also trigger avoidance and denial in the audience, resulting in preparedness reduction; the opposite effect of what may have been intended by the speaker. Recent social research has provided insight into a better approach. The theory of communicating actionable risk posits that people will take action against hazards when they know what to do, think it would work, and know someone who did it. This approach was recently applied in an intervention designed to motivate earthquake-resistant construction in Kathmandu Valley, Nepal. Social theory further suggests that a tendency towards action is strengthened by hearing a consistent message over time, and by providing the audience with an appropriate opportunity to seek out relevant information. This presentation shows how, by taking this transdisciplinary step, scientists can make small changes in their hazard communication, thereby acting as positive influencers of change. A summary of "do's" and "don'ts" is given for reference. 1. Show examples of what to do. 2. Show effectiveness of actions. 3. Give sense of knowing someone who did it. 4. Deliver consistent message, repeatedly. 5. Give opportunity for more information. DON'T: 1. Make the disaster the star. 2. Contradict other communications.

  8. Tegafur/gimeracil/oteracil (TS-1 induced Stevens–Johnson syndrome: Case report

    Directory of Open Access Journals (Sweden)

    Satoko Minakawa

    2013-09-01

    Full Text Available TS-1 is an oral fluoropyrimidine anticancer drug that contains tegafur, gimeracil, and oteracil. A 78-year-old Japanese male who was diagnosed with carcinoma of the oral floor (rT4aN0M0 was prescribed a standard dose of TS-1 (80 mg/day. On Day 8 after administration of TS-1, an eruption developed. There was erythema, along with vesicles and erosions involving the lip, face, neck, trunk, limbs, and genitals. The drug-induced lymphocyte stimulation test (DLST for TS-1 was negative on the 23rd day, but positive on the 43rd day (20 days after discontinuing prednisolone. The condition was diagnosed as Stevens–Johnson syndrome due to TS-1 because of the clinical course and laboratory results. This case and 24 cases previously reported in the literature were analyzed. The types of drug eruption were drug-related lupus (9 cases, acral erythema (7 cases, scleroderma-like skin lesion (2 cases, Stevens–Johnson syndrome (2 cases, lichenoid eruption (1 case, purpura (1 case, lichen planus (1 case, erythema multiforme (1 case, hypopigmentation (1 case and toxic epidermal necrolysis (1 case, respectively. In view of the increasing usage of TS-1 in several common cancers, clinicians should be aware of drug eruptions due to TS-1.

  9. 77 FR 43817 - Notice of Submission for OMB Review; Office of Postsecondary Education; Talent Search (TS) Annual...

    Science.gov (United States)

    2012-07-26

    ...; Talent Search (TS) Annual Performance Report SUMMARY: The Talent Search program provides Federal... Records Management Services, Office of Management, publishes this notice containing proposed information... records. Title of Collection: Talent Search (TS) Annual Performance Report. OMB Control Number: Pending...

  10. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  11. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  12. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  13. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  14. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  15. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  16. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  17. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  18. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  19. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  17. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  2. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT: TRITON SYSTEMS, LLC SOLID BOWL CENTRIFUGE, MODEL TS-5000

    Science.gov (United States)

    Verification testing of the Triton Systems, LLC Solid Bowl Centrifuge Model TS-5000 (TS-5000) was conducted at the Lake Wheeler Road Field Laboratory Swine Educational Unit in Raleigh, North Carolina. The TS-5000 was 48" in diameter and 30" deep, with a bowl capacity of 16 ft3. ...

  16. Activity report 2015 Commission Perspectives du Reseau

    International Nuclear Information System (INIS)

    Ricour, Olivia

    2016-01-01

    This document contains the activity report for 2015 of the Commission Perspectives du Reseau which has been set up by RTE to be the main body for organising a dialogue with all the actors of the energy sector and civil society about challenges and stakes of the electric power system on the medium and on the long term. It describes how this body aims at sharing knowledge and expertise of all stakeholders (publications, European platform for data transparency), at being a place for debating and enriching the understanding of tomorrow's important stakes for the power system (discussion of the issue of greenhouse gas emissions with an analysis of the impact of the CO 2 price signal on emissions by the European electricity system and results of the e-Highway 2050 European project). The road-map of the Commission works for 2016 is provided, as well as a list of members

  17. Commission of energy regulation. 2004 activity report

    International Nuclear Information System (INIS)

    2004-01-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  18. Electricity supply

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-10-01

    This report focuses on the Securities and Exchange Commission's (SEC) administration of the Public Utility Holding Company Act of 1935, intended to protect the public, investors, and consumers from abuses associated with the control of electric and gas utility companies through the holding company structure. These abuses include subjecting subsidiary utilities to excessive charges for services, construction work, and materials; frustrating effective state regulation through the holding company structure; and overloading subsidiary utilities with debt to prevent voluntary rate reductions. GAO discusses industry changes during the past decade involving electric utility holding companies; SEC's regulatory response to such changes; and the relationship between SEC, the Federal Energy Regulatory Commission, and states in protecting consumer and investor interests in light of these changes

  19. Limitation of Electrical Power in January

    CERN Multimedia

    2006-01-01

    During maintenance work on CERN's 400 kV main electrical supply in Prevessin, the laboratory will be connected to the 130 kV Suisse network in Meyrin from 4 to 22 January. Due to the on-going LHC activities during this period, the power demand will be very close to the technical limitations of this source. The effort of every one to reduce the consumption of electrical energy during this period is vital to avoid powercuts caused by exceeding the maximum capacity of the system. Mario Batz TS/CV Gerard Cumer TS/EL

  20. Limitation of Electrical Power in January

    CERN Multimedia

    2007-01-01

    During maintenance work on CERN's 400 kV main electrical supply in Prevessin, the laboratory will be connected to the 130 kV Suisse network in Meyrin from 4 to 22 January. Due to the on-going LHC activities during this period, the power demand will be very close to the technical limitations of this source. The effort of every one to reduce the consumption of electrical energy during this period is vital to avoid powercuts caused by exceeding the maximum capacity of the system. Mario Batz TS/CV Gerard Cumer TS/EL

  1. 78 FR 72877 - Arkansas Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint

    Science.gov (United States)

    2013-12-04

    ... Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint Take notice that on November... Commission (Commission), 18 CFR 385.206, Arkansas Electric Corporation (Complainant) filed a formal complaint against Oklahoma Gas and Electric Company (Respondents), alleging that the Respondent's Production Formula...

  2. Field Support System (FS-AID) and Working Capital Fund Tracking System (WCF-TS)

    Data.gov (United States)

    US Agency for International Development — The Field Support System (FS-AID) and Working Capital Fund Tracking System (WCF-TS) are two modules of a single data management system that share common tables and...

  3. Dos and Don'ts of Giving OTC Cough and Cold Medicines to Your Child

    Science.gov (United States)

    ... workers, extended family members, or babysitters) knows what medicines your child is taking and when he or she should ... ts Don’t give OTC cough and cold medicines to a child younger than 4 years of age unless your ...

  4. Nuclear Regulatory Commission Issuances, September 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Commonwealth Edison Company (Dresden Nuclear Power Station, Unit 1), Consolidated Edison Company of New York (Indian Point, Unit 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Power Authority of the State of New York (Indian Point, Unit 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2); Issuances of Atomic Safety and Licensing Appeal Boards--Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Philadelphia Electric Company, et al. (Peach Bottom Atomic Power Statin, Units 2 and 3), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Statin, Unit No. 2), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3); Issuances of the Atomic Safety Licensing Boards--Cleveland Electric Illuminating Company, et al. (Perry Nuclear Power Plant, Units 1 and 2), Commonwealth Edison Company (Dresden Station, Units 2 and 3), Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Southern California Edison Company, et al. (San Onofre Nuclear Generating Station, Units 2 and 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2), Texas Utilities Generating Company, et al

  5. Identification of aquifer potential in Karanganyar city by using vertical electrical sounding method

    Science.gov (United States)

    Marfuatik, L.; Koesuma, S.; Legowo, B.; Darsono

    2018-03-01

    The identification of aquifer was done by using Vertical Electrical Sounding (VES) method. This research aims to identify potential and depth of the aquifers. The locations of surveys are at ten points,namely TS1 (Alastuwo), TS2 (Wonorejo), TS3 (Kaling), TS4 (Kaling), TS5 (Buran), TS6 (Wonolopo), TS7 (Buran), TS8 (Ngijo), TS9 (Jati), and TS10 (Suruhkalang) where all located in Karanganyar regency. The survey path is about 500-600 meters length which can penetrate current to 100 – 200 meters in depth. The measurement was done by using OYO Mc OHM-EL Model 2119C. Geoelectrical data analysis was processed using Progress version 3.0 Software. The interpretation result shows that the locations of research area are included in Lawu-volcano rock formation which is breccias, lava, and tuff as the constituents. We found that unconfined aquifer in all of locations with different depth and confined aquifer just 7 locations start from 25.04 meters.

  6. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  7. Konstantin Päts ja NSV Liidu Tallinna saatkond / Magnus Ilmjärv

    Index Scriptorium Estoniae

    Ilmjärv, Magnus, 1961-

    1999-01-01

    Järg Sep/13,14,15,16,17,18,20,21,22,22 lk. 17,21,17,18,18,16,17,21,18,14. Päts kui Nõukogude saatkonna lobitegija. Välisminister Pusta kangutamine. Pätsi info venelastele J. Tõnissoni kohta. Balti riikide vahelise koostöö takistamine. J. Puhk tõmmati venelaste mõjusfääri. Päts nõuab Eesti valitsuselt uut kaubanduslepingut venelastega

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  11. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  12. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  13. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  14. T-S Fuzzy Modelling and H∞ Attitude Control for Hypersonic Gliding Vehicles

    Directory of Open Access Journals (Sweden)

    Weidong Zhang

    2017-01-01

    Full Text Available This paper addresses the T-S fuzzy modelling and H∞ attitude control in three channels for hypersonic gliding vehicles (HGVs. First, the control-oriented affine nonlinear model has been established which is transformed from the reentry dynamics. Then, based on Taylor’s expansion approach and the fuzzy linearization approach, the homogeneous T-S local modelling technique for HGVs is proposed. Given the approximation accuracy and controller design complexity, appropriate fuzzy premise variables and operating points of interest are selected to construct the T-S homogeneous submodels. With so-called fuzzy blending, the original plant is transformed into the overall T-S fuzzy model with disturbance. By utilizing Lyapunov functional approach, a state feedback fuzzy controller has been designed based on relaxed linear matrix inequality (LMI conditions to stable the original plants with a prescribed H∞ performance of disturbance. Finally, numerical simulations are performed to demonstrate the effectiveness of the proposed H∞ T-S fuzzy controller for the original attitude dynamics; the superiority of the designed T-S fuzzy controller compared with other local controllers based on the constructed fuzzy model is shown as well.

  15. Movable Thomson scattering system based on optical fiber (TS-probe)

    International Nuclear Information System (INIS)

    Narihara, K.; Hayashi, H.

    2009-01-01

    This paper proposes a movable compact Thomson scattering (TS) system based on optical fibers (TS-probe). A TS-probe consists of a probe head, optical fiber, a laser-diode, polychromators and lock-in amplifiers. A laser beam optics and light collection optics are mounted rigidly on a probe head with a fixed scattering position. Laser light and scattered light are transmitted by flexible optical fibers, enabling us to move the TS-prove head freely during plasma discharge. The light signal scattered from an amplitude-modulated laser is detected against the plasma light based on the principle of the lock-in amplifier. With a modulated laser power of 300W, the scattered signal from a sheet plasma of 15 mm depth and n e -10 19 m -3 will be measured with 10% accuracy by setting the integrating time to 0.1 s. The TS-probe head is like a 1/20 model of the currently operating LHD-TS. (author)

  16. Report made on the behalf of the Commission for Economic Affairs on the bill project, after accelerated procedure, ratifying decrees number 2016-1019 of July 27, 2016 related to electric power self-consumption, and number 2016-1059 of August 3, 2016 related to the production of electric power from renewable energies and aiming at adapting some arrangements related to power and gas networks and to renewable energies (number 4122). Nr 4192 + Impact study and Recommendations of the Council of State

    International Nuclear Information System (INIS)

    Santais, Beatrice

    2016-01-01

    This official report contains re-transcriptions of debates of a commission about decrees containing measures related to power grids and gas networks, to renewable energies, and self-consumption of electric power, which are useful and even necessary for an efficient implementation of the law on energy transition and for a 'green' growth. These debates addressed and discussed the content of the various articles which are more precisely presented and commented in the second part of the report. For each article, the report contains a synthesis of the Commission's opinion and possible amendments. The articles concerns the ratification of the two decrees, the definition of self-consumed production, the modification of some basic notions appearing in the Code of Energy, the exclusion of net-metering systems, the interdiction of a valorisation of original guarantees of renewable electric power production already benefiting of a public support, a new tariffing of these installations, the modification of the type of gas introduced in networks, and the possibility of using a bidding procedure to develop biogas production capacities. An impact study and the recommendations of the Council of State are attached in appendix

  17. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  18. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  19. Restructuring the Energy System. Report of the Energy Commission

    International Nuclear Information System (INIS)

    1995-01-01

    The commission was instructed to examine the current energy policy programs for restructuring and developing the energy system (i.e. phasing out nuclear power and moving to renewable sources) and to analyze the needs for changes; to propose measures for ensuring an efficient electricity supply under the new conditions of a liberalized electricity market; and to present proposals for a schedule for reorganizing the energy system. The report gives a full picture of the Swedish energy system including supply, consumption, prices, environmental impacts, R and D, and international aspects. The commission concludes that one nuclear power plant can be closed during the 1990's without upsetting the power balances. Phasing out all nuclear plants by year 2010 will create problems with the price levels of electricity supply, and will conflict with the CO 2 reduction objective. The proposals for economic control measures for performing the restructuring include: An environmental bonus (or investment support) for environmentally sound electricity production financed by an electricity tax, a tax on nuclear power increasing with the age of the reactors, a reorganization fund to finance new and environmentally acceptable electricity production. Also, energy research should be allotted greater resources, in particular for new technology for electricity production. The commission points towards the possibilities for reducing energy consumption, and especially electricity consumption. Space heating should gradually move away from electric heating. Examples are given on measures for improving energy efficiency and problems with financing such measures should be studied

  20. 77 FR 15368 - 2012 Annual Meeting of the Ozone Transport Commission

    Science.gov (United States)

    2012-03-15

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9647-5] 2012 Annual Meeting of the Ozone Transport Commission... Environmental Protection Agency is announcing the 2012 Annual Meeting of the Ozone Transport Commission (OTC... such as performance standards for electric generating units (EGUs) on high electric demand days, oil...

  1. 78 FR 25265 - 2013 Annual Meeting of the Ozone Transport Commission

    Science.gov (United States)

    2013-04-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9806-5] 2013 Annual Meeting of the Ozone Transport Commission... Environmental Protection Agency is announcing the 2013 Annual Meeting of the Ozone Transport Commission (OTC... such as performance standards for electric generating units (EGUs) on high electric demand days, oil...

  2. 18 CFR 39.9 - Enforcement of Commission Rules and Orders.

    Science.gov (United States)

    2010-04-01

    ... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.9 Enforcement of Commission Rules and Orders. (a) The... or a Regional Entity to ensure compliance with a Reliability Standard or any Commission order...

  3. Commissioning of the SCT

    International Nuclear Information System (INIS)

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  4. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  5. European Commission policies

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This debate discusses the debate surrounding the proposed European Community (EC) Directive on the completion of the internal energy market for natural gas and electric power. The context in which the liberalisation program is proposed is described for electricity, considering political issues, international ownership patterns and trade between Eastern and Western Europe. The author then argues for Member States to be consistent and fair, bearing in mind existing variations in liberalisation of national energy markets. Finally the components of the directive are examined. The United Kingdom, with its already liberalised electricity industry has much to gain from the Directive, while other countries which oppose it, are seen as protecting the vested interests of their own utilities. (UK)

  6. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  7. The role of effective communications in Nuclear Regulatory Commission licensing

    International Nuclear Information System (INIS)

    Counsil, W.G.

    1991-01-01

    Communications are essential to the licensing and general regulatory program of the Nuclear Regulatory Commission. This paper attempts to identify and address certain aspects of, and approaches to, maintaining effective and efficient communications. It considers, from the perspective of the high-level radioactive waste repository program, both internal communication within the DOE itself and external communication with the Nuclear Regulatory Commission and interested parties. Many of the points presented are based on lessons learned from electric utility experience with nuclear plants

  8. Nuclear safety research at the European Commission's Joint Research Centre

    International Nuclear Information System (INIS)

    Toerroenen, K.

    2003-01-01

    Nuclear power plants currently generate some 35 % of electricity used in the European Union and applicant countries. Nuclear safety will therefore remain a priority for the EU, particularly in view of enlargement, the need to monitor ageing nuclear installations and the licencing of advanced new reactor systems. The European Commission's Joint Research Centre (JRC), with its long involvement and recognised competence in nuclear safety related activities, provides direct support to the European Commission services responsible for nuclear safety and civil protection. (author)

  9. Report made on the behalf of the Inquiry Commission of the real cost of electricity in order to determine the charging to the different economic agents - Nr 667: Volume 1 Report, Volume 2 Hearing reports and appendices

    International Nuclear Information System (INIS)

    Poniatowski, Ladislas; Desessard, Jean

    2012-01-01

    The first part of this parliamentary report outlines and comments the fact that actual prices of electricity have stopped decreasing. The authors describe and comment the electricity market within the European context, and show that the present costs are moderate in France because of the high share of nuclear electricity in the energy mix. They also show that costs tend to increase because of a need of high investments due to an increasing demand and to the entrance into a new phase of investments in energy production (for the maintenance or lifetime extension of power stations, for the development of renewable energies). The second part addresses a possible new decentralised model which would give a better place to energy safety and efficiency (search for a new balance between producing more and consuming less, debate on all the aspects of the nuclear issue, possible scenarios which all require investments). The authors examine the possible support measures for a transparent and true policy on price (possibility to make pay the actual cost of electricity, how to finance the grid strengthening and adaptation, promotion of collective or individual autonomy)

  10. Report of nuclear utility industry responses to Kemeny Commission recommendations

    International Nuclear Information System (INIS)

    1989-02-01

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  11. Report of nuclear utility industry responses to Kemeny Commission recommendations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-02-15

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  12. Commissioning the GTA accelerator

    International Nuclear Information System (INIS)

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  13. GP commissioning in England.

    Science.gov (United States)

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  14. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  15. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  16. T.S. ELIOT'S MISREADING OF SOME LITERARY SOURCES IN THE WASTE LAND

    Directory of Open Access Journals (Sweden)

    Liem Satya Limanta

    2002-01-01

    Full Text Available A poet cannot be a poet at all if he is not connected with all the poetic tradition before him. This is T.S. Eliot's dictum which he stated in Tradition and the Individual Talent and which he practiced in his work The Waste Land. T.S. Eliot showed his relationship with the past through all the quotations and allusions to mythical, literary, and religious works. His reading of those sources according to Paul de Man cannot avoid misreading or misinterpretation. Harold Bloom has tried to build up a theory of misreading, which he prefers to call misprision, especially applied to and done by poets in The Anxiety of Influence. Throughout this article I shall show how T.S. Eliot has applied some of the ways Bloom describes in reading some of the literary sources, and by so doing Eliot has given new meaning to them.

  17. ChemTS: an efficient python library for de novo molecular generation

    Science.gov (United States)

    Yang, Xiufeng; Zhang, Jinzhe; Yoshizoe, Kazuki; Terayama, Kei; Tsuda, Koji

    2017-12-01

    Automatic design of organic materials requires black-box optimization in a vast chemical space. In conventional molecular design algorithms, a molecule is built as a combination of predetermined fragments. Recently, deep neural network models such as variational autoencoders and recurrent neural networks (RNNs) are shown to be effective in de novo design of molecules without any predetermined fragments. This paper presents a novel Python library ChemTS that explores the chemical space by combining Monte Carlo tree search and an RNN. In a benchmarking problem of optimizing the octanol-water partition coefficient and synthesizability, our algorithm showed superior efficiency in finding high-scoring molecules. ChemTS is available at https://github.com/tsudalab/ChemTS.

  18. A hybrid GA-TS algorithm for open vehicle routing optimization of coal mines material

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.W.; Ding, C.; Zhu, K.J. [China University of Geoscience, Wuhan (China)

    2011-08-15

    In the open vehicle routing problem (OVRP), the objective is to minimize the number of vehicles and the total distance (or time) traveled. This study primarily focuses on solving an open vehicle routing problem (OVRP) by applying a novel hybrid genetic algorithm and the Tabu search (GA-TS), which combines the GA's parallel computing and global optimization with TS's Tabu search skill and fast local search. Firstly, the proposed algorithm uses natural number coding according to the customer demands and the captivity of the vehicle for globe optimization. Secondly, individuals of population do TS local search with a certain degree of probability, namely, do the local routing optimization of all customer sites belong to one vehicle. The mechanism not only improves the ability of global optimization, but also ensures the speed of operation. The algorithm was used in Zhengzhou Coal Mine and Power Supply Co., Ltd.'s transport vehicle routing optimization.

  19. AHP 40: NAMUYI TIBETAN pha⁵⁴ tsə⁵⁴ RITUALS AND ORAL CHANTS

    Directory of Open Access Journals (Sweden)

    Libu Lakhi (Li Jianfu

    2016-02-01

    Full Text Available sa54 da54 (b. 1939 is a Namuyi pha54 tsə54 - a traditional Namuyi religious practitioner/ specialist - who chants and conducts religious rituals. He lives and practices in Liangshan Yi Autonomous Prefecture, Sichuan Province, China. This article introduces pha54 tsə54 sa54 da54 and the many hours of his oral materials recorded by Libu Lakhi in 2009 that are archived at http://tinyurl.com/lgf3row. In addition, aspects of Namuyi religion are described, including terms of mountain deities, ill omens and taboos, the pha54 tsə54, sa54 da54, chants, and a personal account of a ritual done in Dashui Village, Minsheng Township, Xichang City, Sichuan Province in March 2013. An appendix, seven photographs, and a diagram provide additional detail.

  20. Advice from the Commission of Electricity Regulation (CRE) dated from April 4, 2002 about the by-law establishing the conditions of purchase of the electricity produced by facilities using, as main source, the energy coming from the combustion or explosion of non-fossil matter of vegetal origin; Avis de la Commission de Regulation de l'Electricite (CRE) en date du 4 avril 2002 sur l'arrete fixant les conditions d'achat de l'electricite produite par les installations utilisant, a titre principal, l'energie degagee par la combustion ou l'explosion de matieres non fossiles d'origine vegetale

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-04-01

    This document presents the analysis made by the French commission of electricity regulation (CRE) about the by-law fixing the conditions of purchase of the electricity produced by biomass-fueled facilities: considerations common to all power generation files that benefit from the obligation of purchase (tariff of purchase of the electricity produced, advantages of a call for bids system, existing decrees and by-laws, estimation of saved costs and environmental benefits, impact on the greenhouse effect abatement and on the air quality, conformability with the European regulation); cost-benefit analysis of the present by-law: description of the proposed tariff of purchase for the electricity produced by biomass-fueled facilities; comparison of the proposed tariff with the saved costs and the environmental benefits; comparison of the tariff with the production costs and analysis of the technical modalities; advice of the CRE. (J.S.)

  1. Digastric Muscle Phenotypes of the Ts65Dn Mouse Model of Down Syndrome.

    Directory of Open Access Journals (Sweden)

    Tiffany J Glass

    Full Text Available Down syndrome is frequently associated with complex difficulties in oromotor development, feeding, and swallowing. However, the muscle phenotypes underlying these deficits are unclear. We tested the hypotheses that the Ts65Dn mouse model of DS has significantly altered myosin heavy chain (MyHC isoform profiles of the muscles involved in feeding and swallowing, as well as reductions in the speed of these movements during behavioral assays. SDS-PAGE, immunofluorescence, and qRT-PCR were used to assess MyHC isoform expression in pertinent muscles, and functional feeding and swallowing performance were quantified through videofluoroscopy and mastication assays. We found that both the anterior digastric (ADG and posterior digastric (PDG muscles in 11-day old and 5-6 week old Ts65Dn groups showed significantly lower MyHC 2b protein levels than in age-matched euploid control groups. In videofluoroscopic and videotape assays used to quantify swallowing and mastication performance, 5-6 week old Ts65Dn and euploid controls showed similar swallow rates, inter-swallow intervals, and mastication rates. In analysis of adults, 10-11 week old Ts65Dn mice revealed significantly less MyHC 2b mRNA expression in the posterior digastric, but not the anterior digastric muscle as compared with euploid controls. Analysis of MyHC 2b protein levels across an adult age range (10-53 weeks of age revealed lower levels of MyHC 2b protein in the PDG of Ts65Dn than in euploids, but similar levels of MyHC 2b in the ADG. Cumulatively, these results indicate biochemical differences in some, but not all, muscles involved in swallowing and jaw movement in Ts65Dn mice that manifest early in post-natal development, and persist into adulthood. These findings suggest potential utility of this model for future investigations of the mechanisms of oromotor difficulties associated with Down syndrome.

  2. BlendCAC: A BLockchain-ENabled Decentralized Capability-based Access Control for IoTs

    OpenAIRE

    Xu, Ronghua; Chen, Yu; Blasch, Erik; Chen, Genshe

    2018-01-01

    The prevalence of Internet of Things (IoTs) allows heterogeneous embedded smart devices to collaboratively provide smart services with or without human intervention. While leveraging the large scale IoT based applications like Smart Gird or Smart Cities, IoTs also incur more concerns on privacy and security. Among the top security challenges that IoTs face, access authorization is critical in resource sharing and information protection. One of the weaknesses in today's access control (AC) is ...

  3. Report made on behalf of the commission of economic affairs, environment and territory about the proposal of law, adopted in second lecture with modifications by the Senate, relative to the electricity and natural gas regulated tariffs

    International Nuclear Information System (INIS)

    2008-01-01

    This text is the conclusion of a long parliamentary procedure with several debates about electricity and natural gas prices, for both individual users and companies. The first article of the proposal of law relative to regulated electricity and gas tariffs, is the only one that remains to be discussed, and concerns the households and the companies with a low power consumption. Examined first at the Senate on October 1, 2007, this proposal of law was debated at the House of Commons on December 11, 2007 and modified for one important point: the possibility for households who have made the choice of a de-regulated energy supplier to change back and benefit again of the regulated tariffs. The adoption of this amendment has led to make some adjustments in the proposal of law which are presented in this document. (J.S.)

  4. A Solution-Based Temperature Sensor Using the Organic Compound CuTsPc

    Directory of Open Access Journals (Sweden)

    Shahino Mah Abdullah

    2014-06-01

    Full Text Available An electrochemical cell using an organic compound, copper (II phthalocyanine-tetrasulfonic acid tetrasodium salt (CuTsPc, has been fabricated and investigated as a solution-based temperature sensor. The capacitance and resistance of the ITO/CuTsPc solution/ITO chemical cell has been characterized as a function of temperature in the temperature range of 25–80 °C. A linear response with minimal hysteresis is observed. The fabricated temperature sensor has shown high consistency and sensitive response towards a specific range of temperature values.

  5. Safety inspections - the role of TS : risks, their assessment and the role of safety systems

    CERN Document Server

    Béjar-Alonso, Isabel; CERN. Geneva. TS Department

    2008-01-01

    In 2007 the DG decided a new approach for safety at CERN. This had as consequence the creation of a new unit, the safety service provider, in the TS department. The organization and the services that this unit provides to CERN will be described and the achievements since the creation of the unit will be summarized. Some important personnel safety systems, on their side have been the responsibility of the TS Department for many years. Their importance has grown with the arrival of LHC and their complexity and impact on operation has increased. Their role as well as the importance of an appropriate regulatory framework shall be discussed.

  6. Photocatalytic hydrogen generation over Eosin Y-Sensitized TS-1 zeolite

    International Nuclear Information System (INIS)

    Zhang Xiaojie; Jin Zhiliang; Li Yuexiang; Li Shuben; Lu Gongxuan

    2008-01-01

    Eosin Y-sensitized TS-1 zeolite was studied for the photo-reduction of water into hydrogen driven by visible light (λ ≥ 420 nm). The optimal pH and weight ratio between Eosin Y and TS-1 zeolite is 7 and 1/8, respectively. In the presence of triethanolamine (TEA) as an electron donor, the highest rate of hydrogen generation and apparent quantum efficiency are 34 μmol h -1 and 9.4%, respectively, under visible light irradiation (λ ≥ 420 nm). Short-term stability test indicates that the catalyst is rather stable during 50 h photoreaction

  7. Photocatalytic hydrogen generation over Eosin Y-Sensitized TS-1 zeolite

    Energy Technology Data Exchange (ETDEWEB)

    Zhang Xiaojie [State Key Laboratory for Oxo Synthesis and Selective Oxidation, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Tianshui Zhong Road 18, Lanzhou 730000 (China); Graduate University of the Chinese Academy of Sciences, Beijing 100101 (China); Jin Zhiliang [State Key Laboratory for Oxo Synthesis and Selective Oxidation, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Tianshui Zhong Road 18, Lanzhou 730000 (China); Li Yuexiang [Department of Chemistry, Nanchang University, Nanjing Road 245, Nanchang 330047 (China); Li Shuben [State Key Laboratory for Oxo Synthesis and Selective Oxidation, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Tianshui Zhong Road 18, Lanzhou 730000 (China); Lu Gongxuan [State Key Laboratory for Oxo Synthesis and Selective Oxidation, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Tianshui Zhong Road 18, Lanzhou 730000 (China)], E-mail: gxlu@lzb.ac.cn

    2008-05-30

    Eosin Y-sensitized TS-1 zeolite was studied for the photo-reduction of water into hydrogen driven by visible light ({lambda} {>=} 420 nm). The optimal pH and weight ratio between Eosin Y and TS-1 zeolite is 7 and 1/8, respectively. In the presence of triethanolamine (TEA) as an electron donor, the highest rate of hydrogen generation and apparent quantum efficiency are 34 {mu}mol h{sup -1} and 9.4%, respectively, under visible light irradiation ({lambda} {>=} 420 nm). Short-term stability test indicates that the catalyst is rather stable during 50 h photoreaction.

  8. Review of $V_{cb}$ and $V_{td}/V_{ts}$

    OpenAIRE

    Forty, Roger W

    1997-01-01

    The current experimental status of the CKM matrix element V_cb and the ratio V_td/V_ts is reviewed. Knowledge of these elements has a strong impact on the unitarity triangle, of interest for studies of CP violation in the B system. The measurements of V_cb from both inclusive semileptonic b decays and the exclusive channel B -> D* l nu are reaching high precision. For V_td/V_ts the strongest upper limit is derived from studies of B-Bbar mixing.

  9. Aleksandr Gol’ts, Armiia Rossii: 11 poteriannykh let, Moscow: Zakharov, 2004, 224 pp.

    Directory of Open Access Journals (Sweden)

    Richard F. Staar

    2004-07-01

    Full Text Available Specialist of military questions, Aleksandr Gol’ts worked for Red Star (Krasnaia Zvezda, the newspaper of the Russian Ministry of Defense, before joining various prestigious magazines such as Itogi. He is considered one of the most prominent journalist on military matters in Russia today. His book, “The Russian Army : 11 lost years”, is dedicated to military reforms in post-Soviet Russia. With his extensive knowledge of institutional realities of the military establishment, Gol’ts provides a...

  10. Arc Security System Based on Harmonics Detection for the TS ICRH Transmitter

    International Nuclear Information System (INIS)

    Berger-by, G.; Beaumont, B.; Lombard, G.; Millon, L.; Mollard, P.; Volpe, D.

    2006-01-01

    Since 1999 and with the help of I.P.P. (Institut fuer Plasmaphysik) Garching, we have tested in the Tore Supra (T.S.) ICRH transmitter, arcs security systems based on harmonics detection in a frequency band lower than the generator frequency. These systems have been designed for ASDEX in order to discriminate between the arcs and the ELMS mismatches during H-mode plasmas; they have been supplied to T.S. by a loan contract by I.P.P. The first tests done in T.S. were very successful and have permitted in 2000 to build a prototype matching T.S. technical requirements. These systems have some advantages in comparison with traditional securities which are based on use of a level on the V r /V f (Reflected to Forward voltage ratio) calculation . They do not use calculation, calibration with frequency or level. They can use RF signals from directional couplers or probes, so they are fully independent of the measurement systems. The detection bandwidth (4 MHz-35 MHz on TS) is independent of the antennae working frequencies. The detection principle is therefore insensitive to the crosstalk between the antennae and to the antennae coupling variations. The RF arc security box is installed in the generator hall which can be located far from the torus hall and the antennae (about 50 m on T.S.) a feature which is very relevant for the ITER transmitters. In 2001 we have built 3 systems based on our prototype in order to improve the protection of the 3 ICRH generators and antennae. These systems use industrial pass-band filters and a very sensitive linear detection (- 60 dBm) in order to facilitate the adjustment. Optical fibbers are used to transfer, with a very high immunity, the trip information to the generator electronic pilot. To guarantee safe operation, a checking test of the entire security chain is performed with a 10 MHz RF oscillator before each plasma start. The RF principle used on T.S. ICRH transmitter and its electronic interactions with the VME command control of

  11. Model project for reduction of electric power consumption in cement plant. Report for fiscal 1999 on achievements of commissioned operation; Cement shosei plant denryoku shohi sakugen model jigyo 1999 nendo itaku gyomu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of utilizing energies efficiently and serving for environmental improvements, a model project was implemented for reduction of electric power consumption in cement plant in Vietnam. This paper reports the achievements in fiscal 1999. This project is intended to install waste heat boilers in waste gas lines in the preheating process in the cement plant, whose waste heat is recovered by steam to generate electric power by using steam turbines. The current fiscal year has executed the following activities: design of turbines, condensers, and oil units; discussions on the arrangement drawings thereof obtained from the Vietnam side; design of piping and provision of the detailed drawings thereof to the Vietnam side; planning of the electric cable routes; planning of instrumentation wiring routes; and grounding and interlocks. Results of the discussions on the proposed plant operation methods were reflected to the system design of the monitoring devices. Furthermore, the turbines were fabricated, and the associated facilities, valves, and piping materials were procured based on the detailed design. The piping materials were given pre-shipment inspections before having been transported to the site. (NEDO)

  12. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  13. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  14. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  15. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  16. Commission for energy regulation - 2012 Activity Report

    International Nuclear Information System (INIS)

    2013-06-01

    After a presentation of the organisation, role and missions of the French Commission for Energy Regulation (CRE), and of its relationship with other institutional actors, this report describes and comments the action of the CRE in the fields of dialogue and transparency. It presents and comments key figures regarding the electricity and gas retail markets. It reports and comments the European reaction to the cold peak of February 2012 (historical peak for consumption and prices, inquiry on the causes of these price peaks, need of a European market). The next part addresses the relationship between electricity grids and territories (solidarity between electricity grids as the basis of the Europe of energy, evolution of French grids to face new needs and to take regional and local dimensions into account). Another part addresses gas infrastructures which are considered as the cornerstone of a good operation for the French market and for the integration of the European energy market (gas world market in 2012, definition of a target model for the gas market by European regulators, evolution of the French market in compliance with the European target model, new tariffs for the use of natural gas transport networks). The report then addresses the development of renewable energies: actions of CRE (bidding, opinion of tariffs), influence of renewable energy development on electricity prices on gross markets, needed evolution of electricity grids. A last part addresses the issues of energy cost, demand management, and struggle against energy poverty

  17. National Knowledge Commission

    Science.gov (United States)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  18. Commissioning the SNO+ Detector

    Science.gov (United States)

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  19. Post commissioning noise study

    International Nuclear Information System (INIS)

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  20. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  1. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-03-01

    This document is the March 1996 listing of NRC issuances. Included are: (1) NRC orders granting Cleveland Electric Illuminating Company's petition for review of the ASLB order LBP-95-17, (2) NRC orders relating to the potential disqualification of two commissioners in the matter of the decommissioning of Yankee Nuclear Power Station, (3) ASLB orders pertaining to the Oncology Services Corporation, (4) ASLB orders pertaining to the Radiation Oncology Center, (5) ASLB orders pertaining to the Yankee Nuclear Power Station, and (6) Director's decision pertaining to the Yankee Nuclear Power Station

  3. Evaluation of a merger of electricity companies from the angle of EC law. European Commission, decision of 17 March 1998, IV/M. 1107 -EDF/ESTAG; Gemeinschaftsrechtliche Beurteilung eines Zusammenschlusses von Stromversorgungsunternehmen. EG-Kommission, Entscheidung vom 17.3.1998, IV/M. 1107 - EDFI/ESTAG -

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1998-12-31

    The (appealable) head note of the decision of the European Commission states:``A merger of electricity companies each holding a dominant market position in geographically different markets is not considered to create or strengthen a dominant market position in the European market area, or a major part of the area.`` The full text of the decision in German is reproduced but not commented. (orig./CB) [Deutsch] Der nicht amtliche Leitsatz der Entscheidung der EG-Kommission lautet: ``Ein Zusammenschluss von Stromversorgungsunternehmen, die auf geographisch voneinander getrennten Maerkten beherrschend sind, fuehrt nicht zu einer Schaffung oder Verstaerkung einer marktbeherrschenden Stellung im europaeischen Wirtschaftsraum oder einem wesentlichen Teil dieses Gebietes.`` Die Entscheidung ist vollstaendig abgedruckt aber nicht kommentiert. (orig./CB)

  4. Report of the French Energy Regulator on electricity interconnection management and use in 2006; Rapport de la Commission de Regulation de l'Energie sur la gestion et l'utilisation des interconnexions electriques en 2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This report aims at, first, evaluating the congestion management methods in force at interconnected power systems managed by the French transmission system operator RTE as required by article 1.10 of the guidelines of 1228/2003 European regulation which foresees that: 'the national regulation authorities regularly evaluates the congestion management methods, in particular by controlling the respect of rules and principles established by the European regulation, and of trends, modalities and conditions fixed by the regulation authorities according to the above principles and rules'. It aims also at sharing the opinions of the commission of energy regulation (CRE) with other European regulating authorities and with all stakeholders involved in the domestic power market, about the management and use of European power interconnections in 2006. Content: 1 - 2005-2006, the turning point for congestion management; 2 - consequences of 2055-2006 changes in interconnections with Germany, Belgium, Spain and Italy; 3 - further improvements still required: allocation system, capacity bids, short-term trades, capacity management in compliance with European law; 4 - conclusion: an indispensable regional approach. (J.S.)

  5. Report on results of audit related to charges for wholesale electric service by New England Power Company under the Fuel-Adjustment Clause filed with the Federal Power Commission

    Energy Technology Data Exchange (ETDEWEB)

    1975-12-01

    During the 39-month period beginning in April 1972 and ending in June 1975, NEPCO, through monthly fuel-adjustment clause (FAC) billings, charged its wholesale customers and certain other customers about $316.1 million. The audit disclosed that in computing FAC charges applicable to its wholesale customers, NEPCO included certain costs not eligible for inclusion in FAC billings under the applicable FAC on file with the Commission. As a result, for the 39-month period ending in June 1975, wholesale customers were overbilled through the FAC an estimated $800,000. The fact that certain costs were not eligible for inclusion under the FAC were not construed as meaning that the costs may not be proper for consideration in establishing NEPCO's cost of service for rate purposes, apart from the FAC. The staff concluded that in all other respects NEPCO had properly billed its customers for charges in the cost of fossil fuel in accordance with its filed fuel-adjustment clause.

  6. Proposal from the Commission of Electricity Regulation (CRE) dated from September 26, 2002 relative to the estimated amount of the charges of the power production public utility for 2003; Proposition de la Commission de Regulation de l'Electricite en date du 26 septembre 2002 relative au montant previsionnel des charges du service public de la production d'electricite pour 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This document presents the estimated amount of the charges of the power production public utility for 2003. This estimation is based on the detailed data supplied by the operators, like Electricite de France (EdF), who bear the charges and by the managers of the public networks. The calculation method used for the estimation is detailed in the appendix: production cost overruns in non-interconnected areas, cost overruns due to the obligation of electricity purchase and to the contracts of purchase anterior to the law from February 10, 2000, estimated amount of the charges to be compensated and of the treasury management costs, estimated number of kWh submitted to contribution in 2003 and unit estimated contribution. (J.S.)

  7. Report made on behalf of the mixed parity commission in charge of the text proposal about the remaining dispositions to be discussed of the project of law relative to the electric and gas public utilities and to the electric and gas companies; Rapport fait au nom de la Commission mixte paritaire chargee de proposer un texte sur les dispositions restant en discussion du projet de loi relatif au service public de l'electricite et du gaz et aux entreprises electriques et gaziere

    Energy Technology Data Exchange (ETDEWEB)

    Lenoir, J.C.; Poniatowski, L

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents, first, in a comparative table the articles adopted by the French house of commons and the changes adopted by the Senate. Then, a common text is proposed by the mixed parity commission for the articles that remained under discussion. (J.S.)

  8. Report on progress in creating the internal gas and electricity market. Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions

    International Nuclear Information System (INIS)

    2010-01-01

    In late 2008 and 2009, the world was hit by the financial and economic crisis. This had a direct impact on the demand for energy, causing unpredicted falls in the price of oil on the international markets. This, in turn, impacted on gas and electricity prices. A dispute between two companies outside the EU (Gazprom of Russia and Naftogaz of Ukraine) led to an unprecedented crisis in the EU's gas supply. Between 6 and 20 January 2009, gas flows from Russia to the EU via Ukraine were interrupted, affecting several Member States. 2009 was also an important year because the third internal energy market package was adopted on 13 July 2009. The third package strengthens the regulatory framework that is needed in order to make market opening fully effective, in the interest of achieving the lowest possible energy prices, better energy security and sustainability. This report discusses how the developments described above have impacted on the EU electricity and gas markets over the past year and how they are likely to affect market developments in the future.

  9. 75 FR 38168 - Hazardous Materials: International Regulations for the Safe Transport of Radioactive Material (TS...

    Science.gov (United States)

    2010-07-01

    ... may also provide contact information, such as a telephone number and/or e-mail address. PHMSA and the.... PHMSA-2010-0130 (Notice No.10-2)] Hazardous Materials: International Regulations for the Safe Transport... (IAEA) ``Regulations for the Safe Transport of Radioactive Material'' (TS-R-1), which is scheduled for...

  10. Deep-HiTS: Rotation Invariant Convolutional Neural Network for Transient Detection

    Science.gov (United States)

    Cabrera-Vives, Guillermo; Reyes, Ignacio; Förster, Francisco; Estévez, Pablo A.; Maureira, Juan-Carlos

    2017-02-01

    We introduce Deep-HiTS, a rotation-invariant convolutional neural network (CNN) model for classifying images of transient candidates into artifacts or real sources for the High cadence Transient Survey (HiTS). CNNs have the advantage of learning the features automatically from the data while achieving high performance. We compare our CNN model against a feature engineering approach using random forests (RFs). We show that our CNN significantly outperforms the RF model, reducing the error by almost half. Furthermore, for a fixed number of approximately 2000 allowed false transient candidates per night, we are able to reduce the misclassified real transients by approximately one-fifth. To the best of our knowledge, this is the first time CNNs have been used to detect astronomical transient events. Our approach will be very useful when processing images from next generation instruments such as the Large Synoptic Survey Telescope. We have made all our code and data available to the community for the sake of allowing further developments and comparisons at https://github.com/guille-c/Deep-HiTS. Deep-HiTS is licensed under the terms of the GNU General Public License v3.0.

  11. Study of the Integration of the CNU-TS-1 Mobile Tunnel Monitoring System.

    Science.gov (United States)

    Du, Liming; Zhong, Ruofei; Sun, Haili; Zhu, Qiang; Zhang, Zhen

    2018-02-01

    A rapid, precise and automated means for the regular inspection and maintenance of a large number of tunnels is needed. Based on the depth study of the tunnel monitoring method, the CNU-TS-1 mobile tunnel monitoring system (TS1) is developed and presented. It can efficiently obtain the cross-sections that are orthogonal to the tunnel in a dynamic way, and the control measurements that depend on design data are eliminated. By using odometers to locate the cross-sections and correcting the data based on longitudinal joints of tunnel segment lining, the cost of the system has been significantly reduced, and the interval between adjacent cross-sections can reach 1-2 cm when pushed to collect data at a normal walking speed. Meanwhile, the relative deformation of tunnel can be analyzed by selecting cross-sections from original data. Through the measurement of the actual tunnel, the applicability of the system for tunnel deformation detection is verified, and the system is shown to be 15 times more efficient than that of the total station. The simulation experiment of the tunnel deformation indicates that the measurement accuracy of TS1 for cross-sections is 1.1 mm. Compared with the traditional method, TS1 improves the efficiency as well as increases the density of the obtained points.

  12. Study of the Integration of the CNU-TS-1 Mobile Tunnel Monitoring System

    Directory of Open Access Journals (Sweden)

    Liming Du

    2018-02-01

    Full Text Available A rapid, precise and automated means for the regular inspection and maintenance of a large number of tunnels is needed. Based on the depth study of the tunnel monitoring method, the CNU-TS-1 mobile tunnel monitoring system (TS1 is developed and presented. It can efficiently obtain the cross-sections that are orthogonal to the tunnel in a dynamic way, and the control measurements that depend on design data are eliminated. By using odometers to locate the cross-sections and correcting the data based on longitudinal joints of tunnel segment lining, the cost of the system has been significantly reduced, and the interval between adjacent cross-sections can reach 1–2 cm when pushed to collect data at a normal walking speed. Meanwhile, the relative deformation of tunnel can be analyzed by selecting cross-sections from original data. Through the measurement of the actual tunnel, the applicability of the system for tunnel deformation detection is verified, and the system is shown to be 15 times more efficient than that of the total station. The simulation experiment of the tunnel deformation indicates that the measurement accuracy of TS1 for cross-sections is 1.1 mm. Compared with the traditional method, TS1 improves the efficiency as well as increases the density of the obtained points.

  13. Impôts, taxes et équité entre les sexes : codes, comportements et ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    6 déc. 2010 ... On sait que les impôts et la taxation peuvent favoriser l'égalité socioéconomique, mais ... Analysis of Direct and Indirect Taxes in Developing and Developed Countries. ... Gender and taxation in South Africa: a policy brief.

  14. The E-learning Cabaret: do's and don'ts in E-Learning Design

    NARCIS (Netherlands)

    Westera, Wim

    2009-01-01

    Westera, W. (2006). The E-Learning Cabaret: do's and don'ts in E-Learning Design. Book of Abstracts, 12th International Conference on Technology Supported Learning & Teaching, Online Educa Berlin (pp. 169-171). November, 29-December, 1, 2006, Berlin, Germany: ICWE-GmbH.

  15. 75 FR 67705 - Office of Postsecondary Education; Overview Information; Talent Search (TS) Program; Notice...

    Science.gov (United States)

    2010-11-03

    ... DEPARTMENT OF EDUCATION Office of Postsecondary Education; Overview Information; Talent Search (TS... currently being served by a Talent Search project, especially schools that the State has identified as the... reliable third-party sources when providing information on the implementation of their Talent Search...

  16. PFCRT and DHFR-TS Sequences for Monitoring Drug Resistance in ...

    African Journals Online (AJOL)

    Erah

    from falciparum malaria isolates collected in Adzopé City, Côte d'Ivoire in 2007. Methods: Blood ... performed using specific primers of pfcrt and dhfr-ts. During the study .... The following mixture was prepared to a final volume of 50 ..... following the withdrawal of these anti- malarials as ... Malaria vaccines in Africa. Acta Trop.

  17. Two-year survival of glass ionomer sealanTs placed as parT of ...

    African Journals Online (AJOL)

    2010-09-09

    Sep 9, 2010 ... Two-year survival of glass ionomer sealanTs placed as parT of proximal aTraumaTic. resToraTive ... absTracT. Objective: To evaluate after two years, the survival rate of glass ionomer cement (gic) ... or symptoms of periodontal disease, and clinically the ..... saliva contamination on the bond of dentine resin-.

  18. Guidelines : the do's, don'ts and don't knows of feedback for clinical education

    NARCIS (Netherlands)

    Lefroy, Janet; Watling, Chris; Teunissen, Pim W; Brand, Paul

    2015-01-01

    INTRODUCTION: The guidelines offered in this paper aim to amalgamate the literature on formative feedback into practical Do's, Don'ts and Don't Knows for individual clinical supervisors and for the institutions that support clinical learning. METHODS: The authors built consensus by an iterative

  19. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    International Nuclear Information System (INIS)

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  20. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  1. Cloning and Characterization of EF-Tu and EF-Ts from Pseudomonas aeruginosa

    Directory of Open Access Journals (Sweden)

    Stephanie O. Palmer

    2013-01-01

    Full Text Available We have cloned genes encoding elongation factors EF-Tu and EF-Ts from Pseudomonas aeruginosa and expressed and purified the proteins to greater than 95% homogeneity. Sequence analysis indicated that P. aeruginosa EF-Tu and EF-Ts are 84% and 55% identical to E. coli counterparts, respectively. P. aeruginosa EF-Tu was active when assayed in GDP exchange assays. Kinetic parameters for the interaction of EF-Tu with GDP in the absence of EF-Ts were observed to be = 33 μM, = 0.003 s−1, and the specificity constant was  s−1 μM−1. In the presence of EF-Ts, these values were shifted to = 2 μM, = 0.005 s−1, and the specificity constant was  s−1 μM−1. The equilibrium dissociation constants governing the binding of EF-Tu to GDP ( were 30–75 nM and to GTP ( were 125–200 nM. EF-Ts stimulated the exchange of GDP by EF-Tu 10-fold. P. aeruginosa EF-Tu was active in forming a ternary complex with GTP and aminoacylated tRNA and was functional in poly(U-dependent binding of Phe-tRNAPhe at the A-site of P. aeruginosa ribosomes. P. aeruginosa EF-Tu was active in poly(U-programmed polyphenylalanine protein synthesis system composed of all P. aeruginosa components.

  2. Transport of UF6 in compliance with TS-R-1

    International Nuclear Information System (INIS)

    Dekker, B.G.

    2004-01-01

    The IAEA Regulations TS-R-1 (ST-1, Revised) 1996 Edition include requirements for packages containing uranium hexafluoride (UF6); these are the first and only substance-specific requirements in the IAEA regulations. These requirements have already particularly affected, and will further affect, the transport of non-fissile and fissile excepted UF 6 and the packages used for these transports. Non-fissile and fissile excepted UF6 (ASTM C 787) has been transported worldwide for decades in a safe and reliable manner, using internationally standardised packages. Under the auspices of the World Nuclear Transport Institute (WNTI), an industry working group has been evaluating the existing packages against the requirements in TS-R-1. As new requirements came into effect, there were new challenges for the use of these standard packages, including the free drop test and the thermal requirements. In close cooperation with the WNTI HEXT Industry Working Group, a consortium of UF6 producers/users has worked together on the design and development, testing and certification of technical solutions for modification and optimisation of the existing packages to comply with TS-R-1. This paper reviews the existing standard packages against the requirements in TS-R-1. An update is also given describing the enhancements to the standard packages that have been designed and developed recently. The paper also describes how these solutions have been tested and certified, as well as the status of implementation. Finally, a review is made of the options that are available internationally to transport UF6 in compliance with TS-R-1. (author)

  3. Development of an Operational TS Dataset Production System for the Data Assimilation System

    Science.gov (United States)

    Kim, Sung Dae; Park, Hyuk Min; Kim, Young Ho; Park, Kwang Soon

    2017-04-01

    An operational TS (Temperature and Salinity) dataset production system was developed to provide near real-time data to the data assimilation system periodically. It collects the latest 15 days' TS data of the north western pacific area (20°N - 55°N, 110°E - 150°E), applies QC tests to the archived data and supplies them to numerical prediction models of KIOST (Korea Institute of Ocean Science and Technology). The latest real-time TS data are collected from Argo GDAC and GTSPP data server every week. Argo data are downloaded from /latest_data directory of Argo GDAC. Because many duplicated data exist when all profile data are extracted from all Argo netCDF files, DB system is used to avoid duplication. All metadata (float ID, location, observation date and time, etc) of all Argo floats is stored into Database system and a Matlab program was developed to manipulate DB data, to check the duplication and to exclude duplicated data. GTSPP data are downloaded from /realtime directory of GTSPP data service. The latest data except ARGO data are extracted from the original data. Another Matlab program was coded to inspect all collected data using 10 QC tests and produce final dataset which can be used by the assimilation system. Three regional range tests to inspect annual, seasonal and monthly variations are included in the QC procedures. The C program was developed to provide regional ranges to data managers. It can calculate upper limit and lower limit of temperature and salinity at depth from 0 to 1550m. The final TS dataset contains the latest 15 days' TS data in netCDF format. It is updated every week and transmitted to numerical modeler of KIOST for operational use.

  4. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2012-07-05

    ... bulk electric system reliability through steady state power flow, and contain a transient stability... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC...

  5. "Cremaster' tsükkel" : Matthew Barney avastusretk kunsti ja filmikunsti vahealal / Miriam Dagan ; tõlk. Epp Aareleid

    Index Scriptorium Estoniae

    Dagan, Miriam

    2007-01-01

    Ameerika kunstniku ja režissööri kunstnikufilmidest "Cremaster' tsükkel" (1994-2002). Viie tsükli põhisündmusest. Viienda filmi rekvisiitor oli Meeli Salumäe, Kostabi Maailma assistent New Yorgis

  6. Evaluation of the Airborne CASI/TASI Ts-VI Space Method for Estimating Near-Surface Soil Moisture

    Directory of Open Access Journals (Sweden)

    Lei Fan

    2015-03-01

    Full Text Available High spatial resolution airborne data with little sub-pixel heterogeneity were used to evaluate the suitability of the temperature/vegetation (Ts/VI space method developed from satellite observations, and were explored to improve the performance of the Ts/VI space method for estimating soil moisture (SM. An evaluation of the airborne ΔTs/Fr space (incorporated with air temperature revealed that normalized difference vegetation index (NDVI saturation and disturbed pixels were hindering the appropriate construction of the space. The non-disturbed ΔTs/Fr space, which was modified by adjusting the NDVI saturation and eliminating the disturbed pixels, was clearly correlated with the measured SM. The SM estimations of the non-disturbed ΔTs/Fr  space using the evaporative fraction (EF and temperature vegetation dryness index (TVDI were validated by using the SM measured at a depth of 4 cm, which was determined according to the land surface types. The validation results show that the EF approach provides superior estimates with a lower RMSE (0.023 m3·m−3 value and a higher correlation coefficient (0.68 than the TVDI. The application of the airborne ΔTs/Fr  space shows that the two modifications proposed in this study strengthen the link between the ΔTs/Fr space and SM, which is important for improving the precision of the remote sensing Ts/VI space method for monitoring SM.

  7. A green surfactant-assisted synthesis of hierarchical TS-1 zeolites with excellent catalytic properties for oxidative desulfurization.

    Science.gov (United States)

    Du, Shuting; Li, Fen; Sun, Qiming; Wang, Ning; Jia, Mingjun; Yu, Jihong

    2016-02-25

    Hierarchical TS-1 zeolites with uniform intracrystalline mesopores have been successfully synthesized through the hydrothermal method by using the green and cheap surfactant Triton X-100 as the mesoporous template. The resultant materials exhibit remarkably enhanced catalytic activity in oxidative desulfurization reactions compared to the conventional TS-1 zeolite.

  8. Commission 31: Time

    Science.gov (United States)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  9. 77 FR 24189 - Commission Information Collection Activities (FERC-725); Comment Request; Extension

    Science.gov (United States)

    2012-04-23

    ... of Section 215 of the Federal Power Act (FPA).\\2\\ \\1\\ ``Electric Reliability Organization'' or ``ERO... Reliability Standards for the Bulk-Power System, subject to Commission review. \\2\\ Section 215 was added by... information collection, FERC-725, Certification of Electric Reliability Organization; Procedures for Electric...

  10. 77 FR 39691 - Commission Information Collection Activities (FERC-725); Comment Request

    Science.gov (United States)

    2012-07-05

    ... provide for a system of mandatory Reliability Standards developed by the Electric Reliability Organization... establish and enforce reliability standards for the bulk-power system, subject to Commission review. On... information collection FERC-725, Certification of Electric Reliability Organization; Procedures for Electric...

  11. 77 FR 61592 - Arkansas Electric Cooperative Corporation; Mississippi Delta Energy Agency; Clarksdale Public...

    Science.gov (United States)

    2012-10-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-110-000] Arkansas Electric Cooperative Corporation; Mississippi Delta Energy Agency; Clarksdale Public Utilities Commission.... 825(h), Arkansas Electric Cooperative Corporation, Mississippi Delta Energy Agency, and its two...

  12. 76 FR 78693 - Certain Electric Fireplaces, Components Thereof, and Manuals for Same, Processes for...

    Science.gov (United States)

    2011-12-19

    ... INTERNATIONAL TRADE COMMISSION [DN 2865] Certain Electric Fireplaces, Components Thereof, and... Commission has received a complaint entitled In Re Certain Electric Fireplaces, Components Thereof, and... fireplaces, components thereof, and manuals for same, processes for manufacturing or relating to same, and...

  13. Simultaneous and multi-criteria optimization of TS requirements and maintenance at NPPs

    International Nuclear Information System (INIS)

    Martorell, S.; Sanchez, A.; Carlos, S.; Serradell, V.

    2002-01-01

    One of the main concerns of the nuclear industry is to improve the availability of safety-related systems at nuclear power plants (NPPs) to achieve high safety levels. The development of efficient testing and maintenance has been traditionally one of the different ways to guarantee high levels of systems availability, which are implemented at NPP through technical specification and maintenance requirements (TS and M). On the other hand, there is a widely recognized interest in using the probabilistic risk analysis (PRA) for risk-informed applications aimed to emphasize both effective risk control and effective resource expenditures at NPPs. TS and M-related parameters in a plant are associated with controlling risk or with satisfying requirements, and are candidate to be evaluated for their resource effectiveness in risk-informed applications. The resource versus risk-control effectiveness principles formally enter in optimization problems where the cost or the burden for the plant staff is to be minimized while the risk or the availability of the safety equipment is constrained to be at a given level, and vice versa. Optimization of TS and M has been found interesting from the very beginning. However, the resolution of such a kind of optimization problem has been limited to focus on only individual TS and M-related parameters (STI, AOT, PM frequency, etc.) and/or adopting an individual optimization criterion (availability, costs, plant risks, etc.). Nevertheless, a number of reasons exist (e.g. interaction, similar scope, etc.) that justify the growing interest in the last years to focus on the simultaneous and multi-criteria optimization of TS and M. In the simultaneous optimization of TS and M-related parameters based on risk (or unavailability) and cost, like in many other engineering optimization problems, one normally faces multi-modal and non-linear objective functions and a variety of both linear and non-linear constraints. Genetic algorithms (GAs) have

  14. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  15. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  16. The commission of energy regulation: statute, missions and authority

    International Nuclear Information System (INIS)

    Laffaille, D.; Bossoutrot, Ch.

    2008-01-01

    The commission of energy regulation (CRE), which has superseded the commission of electricity regulation, was created by the law no. 2000-108 from February 10, 2000, relative to the modernization and development of the French electric utility. This article presents the situation of CRE's statute, missions and authority seven years after its creation. The statute of CRE warrants its independence, autonomy and impartiality. Its operation means consist in budgetary and personnel resources. Its main mission is the control of the conditions of use of gas and electricity networks and the respect of competition rules: free and transparent access to networks and infrastructures, control of the good operation and development of networks and facilities, regulation of markets, strengthening of the public utility mission. Its authority concerns the management of networks, the book-keeping control of energy operators, the settlement of disputes, the attribution of sanctions, the monitoring of energy markets operation etc. (J.S.)

  17. Galantamine improves olfactory learning in the Ts65Dn mouse model of Down syndrome.

    Science.gov (United States)

    de Souza, Fabio M Simoes; Busquet, Nicolas; Blatner, Megan; Maclean, Kenneth N; Restrepo, Diego

    2011-01-01

    Down syndrome (DS) is the most common form of congenital intellectual disability. Although DS involves multiple disturbances in various tissues, there is little doubt that in terms of quality of life cognitive impairment is the most serious facet and there is no effective treatment for this aspect of the syndrome. The Ts65Dn mouse model of DS recapitulates multiple aspects of DS including cognitive impairment. Here the Ts65Dn mouse model of DS was evaluated in an associative learning paradigm based on olfactory cues. In contrast to disomic controls, trisomic mice exhibited significant deficits in olfactory learning. Treatment of trisomic mice with the acetylcholinesterase inhibitor galantamine resulted in a significant improvement in olfactory learning. Collectively, our study indicates that olfactory learning can be a sensitive tool for evaluating deficits in associative learning in mouse models of DS and that galantamine has therapeutic potential for improving cognitive abilities.

  18. Memory H ∞ performance control of a class T-S fuzzy system

    Science.gov (United States)

    Wang, Yanhua; He, Xiqin; Wu, Zhihua; Kang, Xiulan; Xiu, Wei

    2018-03-01

    For much nonlinear system in the control system, both the stability of the system and certain performance indicators are required. The characteristics of T-S model in fuzzy system make it possible to illustrate a great amount of nonlinear system efficiently. First and foremost, the T-S model with uncertainties and external disturbance is utilized to interpret nonlinear system so as to implement H∞ performance control by means of fuzzy control theory. Meantime, owing to the tremendous existence of time delay phenomenon in the controlled, feedback controller with memory fuzzy state is fabricated. On the basis of Lyapunov Stability Theory, the closed-loop system becomes stable by establishing Lyapunov function. Gain matrix of the memory state feedback controller is obtained by applying linear matrix inequality methodology. And simultaneously it makes the system meet the requirement of the H∞ performance indicator. Ultimately, the efficiency of the above-mentioned method is exemplified by the numerical computation.

  19. New electricity act brings in private sector

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Opening up the State's electricity industry, previously the domain of the former Queensland Electricity Commission (QEC), is part of an overall restructuring of the industry under the new Queensland Electricity Act. Under this Act, the QEC was split into generating and transmission and supply corporations. The Act provides for the regulation of the electricity industry and the regulation of the use of electricity and safety in relation to the supply and use of electricity.(Author). 6 photos

  20. Phase I study of concurrent radiotherapy with TS-1 and vitamin A (TAR therapy) for head and neck cancer

    International Nuclear Information System (INIS)

    Nakashima, Torahiko; Kuratomi, Yuichiro; Yamamoto, Tomoya; Masuda, Muneyuki; Hirakawa, Naoya; Nakamura, Kazumasa; Shioyama, Yoshiyuki; Umezaki, Toshiro; Komune, Shizuo

    2005-01-01

    The triple combination of 5-fluorouracil (5-FU), vitamin A and radiation (FAR therapy) has been effectively used to treat head and neck cancer. The biological anti-tumor effect of 5-FU depends on the activity of its metabolizing enzyme, dihydropyrimidine dehydrogenase (DPD). TS-1 is a novel oral DPD inhibitory fluoropyrimidine (DIF). To improve the anti-tumor effect of FAR therapy, we have applied TS-1 in place of 5-FU injection in the combination of Vitamin A and radiation (TAR therapy). In this study, we have examined the appropriate duration of TS-1 medication and the clinical efficacy and safety of TAR therapy. TS-1 was administered orally at a dose of 65 mg/m 2 twice a day. Vitamin A (Retinol Palmitate: 50,000 U/day) was administered intra-musculary on each day of radiation. Radiation was given (1.5∼2 Gy/day: 5 days/week) for 30∼40 Gy. The levels were divided according to the length of TS-1 application as follows: level 1, 2 weeks; level 2, 3 weeks; level 4, 4 weeks. Grade 4 toxicity of anorexia was observed in one case of level 3. We decided that level 2 (3 weeks of TS-1 administration) was the appropriate length of TS-1 application. TAR therapy is a useful concurrent chemo-radiotherapy which might improve the response rate and quality of life (QOL) of patients with head and neck squamous cell carcinoma (HNSCC). (author)

  1. T-S criticality of black holes with power Maxwell invariant source

    Science.gov (United States)

    Lin, Ze-Tao; Li, Gu-Qiang; Long, Kun; He, Fang; Mo, Jie-Xiong

    2017-09-01

    In this paper, we show that black holes with PMI source exhibit the T-S criticality and derive the relevant critical physical quantities analytically. The values of critical quantities for the case s≠1 vary from those for the case s=1, showing the effect of PMI field on the critical phenomena of black holes. When qPMI field does not affect the Maxwell equal area law.

  2. Disruption of Inhibitory Function in the Ts65Dn Mouse Hippocampus Through Overexpression of GIRK2

    Science.gov (United States)

    2007-10-24

    embryological and developmental or a result of later problems. Delays in prenatal growth of the Ts65Dn cerebral cortex and hippocampus due to longer...cultured from both DS patients and model animals are also reportedly more vulnerable to apoptosis (Sawa, 1999). A majority of research investigating cell...death in DS has been limited to several apoptosis -related genes, including those related to oxidative stress, and transcription factors overexpressed

  3. Vom Stabilitäts- und Wachstumsgesetz zum Wohlstands- und Nachhaltigkeitsgesetz

    OpenAIRE

    Koll, Willi

    2016-01-01

    Das Stabilitäts- und Wachstumsgesetz wird bald 50 Jahre alt. Neue Herausforderungen erfordern eine Wirtschaftspolitik, die weit über die Ziele des Gesetzes hinausweist. Sie muss wirtschaftliches Wachstum und Stabilität mit den Zielen fiskalischer, sozialer und ökologischer Nachhaltigkeit auf nationaler und europäischer Ebene verbinden. Der Autor gibt einen Über blick über solche umfassenden Zielsysteme und leitet daraus ab, wie eine derart erweiterte wirtschaftspolitische Agenda in ein Wohlst...

  4. Electrical transformer handbook

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R.W.; Horne, D. (eds.)

    2005-07-01

    This handbook is a valuable user guide intended for electrical engineering and maintenance personnel, electrical contractors and electrical engineering students. It provides current information on techniques and technologies that can help extend the life of transformers. It discusses transformer testing, monitoring, design, commissioning, retrofitting and other elements involved in keeping electrical transformers in safe and efficient operation. It demonstrates how a power transformer can be put to use and common problems faced by owners. In addition to covering control techniques, testing and maintenance procedures, this handbook covers the power transformer; control electrical power transformer; electrical power transformer; electrical theory transformer; used electrical transformer; down electrical step transformer; electrical manufacturer transformer; electrical picture transformer; electrical transformer work; electrical surplus transformer; current transformer; step down transformer; voltage transformer; step up transformer; isolation transformer; low voltage transformer; toroidal transformer; high voltage transformer; and control power transformer. The handbook includes articles from leading experts on overcurrent protection of transformers; ventilated dry-type transformers; metered load factors for low-voltage, and dry-type transformers in buildings. The maintenance of both dry-type or oil-filled transformers was discussed with reference to sealing, gaskets, oils, moisture and testing. The adoption of dynamic load practices was also discussed along with the reclamation or recycling of used lube oil, transformer dielectric fluids and aged solid insulation. A buyer's guide and directory of transformer manufacturers and suppliers was also included. refs., tabs., figs.

  5. Agent Based Fuzzy T-S Multi-Model System and Its Applications

    Directory of Open Access Journals (Sweden)

    Xiaopeng Zhao

    2015-11-01

    Full Text Available Based on the basic concepts of agent and fuzzy T-S model, an agent based fuzzy T-S multi-model (ABFT-SMM system is proposed in this paper. Different from the traditional method, the parameters and the membership value of the agent can be adjusted along with the process. In this system, each agent can be described as a dynamic equation, which can be seen as the local part of the multi-model, and it can execute the task alone or collaborate with other agents to accomplish a fixed goal. It is proved in this paper that the agent based fuzzy T-S multi-model system can approximate any linear or nonlinear system at arbitrary accuracy. The applications to the benchmark problem of chaotic time series prediction, water heater system and waste heat utilizing process illustrate the viability and the efficiency of the mentioned approach. At the same time, the method can be easily used to a number of engineering fields, including identification, nonlinear control, fault diagnostics and performance analysis.

  6. Commission for Energy regulation (CRE) - Activity report june 2008

    International Nuclear Information System (INIS)

    2008-01-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2008 activity report of CRE. Content: A - How CRE works: CRE regulatory authority and organisation: Powers, Organisation; Budget resources; Personnel; B - The Standing Committee for Dispute Settlement and Sanctions (CoRDiS) activity: Admissibility, Authority; C - Building a single European energy market: Overview; Organisation and coordination of the main European regulators (Work carried out collectively by European regulators, Regulator organisation and development, CRE's relations with European Community institutions, Development of CEER activities outside the European Union); CRE's European activities (The contribution of European regulators to the Third Energy Package, Integration of gas markets, Integration of electricity markets, Operation of the European interconnected electricity grid and security of supply, Opening up markets to benefit consumers); European Community activities (The European Commission's proposals for the internal energy market: the Third Energy Package, The European Commission's proposals for fighting climate change: the Climate Package, Infringement

  7. Commission ushers in new era in Mexican gas industry

    International Nuclear Information System (INIS)

    Monteforte, R.

    1998-01-01

    Transportation and distribution of natural gas in Mexico are undergoing fundamental changes as a result of the 1995 passage by the Congress of Mexico of the law that created the Energy Regulatory Commission (Comision Reguladora de Energia--CRE). The law mandates that the commission must achieve a competitive, efficient, safe, and sustainable gas industry, allowing the country to make the difficult energy transition to open gas and electricity markets relying on cleaner fuels. The paper discusses the situation before CRE, the regulatory framework, market development, and the North American market

  8. 2. Annual report of the Electronuclear Energy Information Commission

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    During its second year of operation, the Electronuclear Energy Information Commission concentrated its efforts on current issues and the conditions and limits of information in the nuclear field. The Commission consulted official organizations (EDF, CEA, Ministry of Industry) as well as trade-union members, politicians and independent individuals of all opinions on electronuclear programs, the problem of 'cracks' discovered in some French reactors and on the public utility enquiry conducted for Plogoff. The Commission also studied the activities of the Ministry of Education in the training of young people in the type of reasoning necessary when faced with complex technical problems. The Commission emphasizes that information policies cannot be valid unless they are preceeded by, or at least accompanied by an appropriate and sufficient amount of education. The debates that took place on the various different topics arising are presented in the eleven following annexes: 1/ decree of November 10th, 1977 concerning the setting up of the Electronuclear Information Commission; 2/ composition of the Commission; 3/ the Harrisburg plant accident (United States); 4/ the 'cracks' observed in some French reactors; 5/ storage and processing of nuclear wastes; 6/ informing the population living in the vicinity of a nuclear plant; 7/ comparative electricity generation costs; 8/ hearing of syndical, political, and ecological organizations; 9/ information on nuclear energy in schools; 10/ quantitative comparisons of the pollution associated with various means; 11/ the realization of impact studies to Plogoff [fr

  9. ERCC1 and TS Expression as Prognostic and Predictive Biomarkers in Metastatic Colon Cancer.

    Directory of Open Access Journals (Sweden)

    Michel B Choueiri

    Full Text Available In patients with metastatic colon cancer, response to first line chemotherapy is a strong predictor of overall survival (OS. Currently, oncologists lack diagnostic tests to determine which chemotherapy regimen offers the greatest chance for response in an individual patient. Here we present the results of gene expression analysis for two genes, ERCC1 and TS, measured with the commercially available ResponseDX: Colon assay (Response Genetics, Los Angeles, CA in 41 patients with de novo metastatic colon cancer diagnosed between July 2008 and August 2013 at the University of California, San Diego. In addition ERCC1 and TS expression levels as determined by RNAseq and survival data for patients in TCGA were downloaded from the TCGA data portal. We found that patients with low expression of ERCC1 (n = 33 had significantly longer median OS (36.0 vs. 10.1 mo, HR 0.29, 95% CI .095 to .84, log-rank p = 9.0x10-6 and median time to treatment to failure (TTF following first line chemotherapy (14.1 vs. 2.4 mo, HR 0.17, 95% CI 0.048 to 0.58, log-rank p = 5.3x10-4 relative to those with high expression (n = 4. After accounting for the covariates age, sex, tumor grade and ECOG performance status in a Cox proportional hazard model the association of low ERCC1 with longer OS (HR 0.18, 95% CI 0.14 to 0.26, p = 0.0448 and TTF (HR 0.16, 95% CI 0.14 to 0.21, p = 0.0053 remained significant. Patients with low TS expression (n = 29 had significantly longer median OS (36.0 vs. 14.8 mo, HR 0.25, 95% CI 0.074 to 0.82, log-rank p = 0.022 relative to those with high expression (n = 12. The combined low expression of ERCC1/TS was predictive of response in patients treated with FOLFOX (40% vs. 91%, RR 2.3, Fisher's exact test p = 0.03, n = 27, but not with FOLFIRI (71% vs. 71%, RR 1.0, Fisher's exact test p = 1, n = 14. Overall, these findings suggest that measurement of ERCC1 and TS expression has potential clinical utility in managing patients with metastatic colorectal

  10. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  11. Combined electric and pressure cuff pain stimuli for assessing conditioning pain modulation (CPM).

    Science.gov (United States)

    Tsukamoto, M; Petersen, K K; Mørch, C D; Arendt-Nielsen, L

    2017-12-29

    Aims Traditionally, conditioning pain modulation (CPM) can be assessed by applying a test stimulus (TS) before and after application of a conditioning stimulus (CS), which is normally applied extra-segmental. Currently, no studies have attempted to apply the TS and CS to the same site using different stimuli modalities. The aim of this study was to evaluate electrical TS and cuff pressure CS applied to the same experimental site for studying CPM. Methods 20 male volunteers participated in this study, which consisted of stimulations applied by a cuff-algometer (NociTech and Aalborg University, Denmark) and current stimulator (Digitimer DS5, UK), through two Ag/AgCl electrodes (Ambu® Neuroline 700, Denmark). The cuff was wrapped around the lower leg and stimulation electrodes were placed under the cuff and to the same location on the contralateral leg. Electrical TS were applied to the non-dominant leg with or without cuff pressure CS on the dominant (CS1) or the same (non-dominant) leg (CS2, electrode under cuff). The subjects were instructed to rate the electrical evoked pain intensity on a 10-cm continuous visual analog scale (VAS, "0" represented "no pain", and "10" represented "maximal pain"). The pain detection threshold (PDT) was defined as "1" on the VAS scale. Results There was no significant deference in PDT for neither CS1 nor CS2. A median split subanalysis on CPM-responders versus CPM-nonresponders to the TS + CS1 combination. Using this grouping, there was significant increase in PDT when comparing TS to TS + CS1 or TS + CS2 (4.0 mA vs 5.6 mA; P CPM can be evoked in a subgroup of subjects by applying the electrical test stimulus and cuff pressure conditioning stimuli to the same experimental site.

  12. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  13. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  14. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  15. QPS Upgrade and Re-commissioning

    CERN Document Server

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  16. Comment on the Nanoparticle Conclusions in Crüts et al. (2008, "Exposure to diesel exhaust induces changes in EEG in human volunteers"

    Directory of Open Access Journals (Sweden)

    Long Christopher M

    2008-07-01

    Full Text Available Abstract A recent publication in this journal reported interesting changes in electroencephalographic (EEG waves that occurred in 10 young, male volunteers following inhalation for one hour of elevated levels of diesel-engine exhaust fumes 1. The authors then proposed a chain of causal events that they hypothesized underlay their observed EEG changes. Their reasoning linked the observed results to nanoparticles in diesel-engine exhaust (DEE, and went on to suggest that associations between changes in ambient particulate matter (PM levels and changes in health statistics might be due to the effects of diesel-engine exhaust (DEE nanoparticles on EEG. We suggest that the extrapolations of the Crüts et al. EEG findings to casual mechanisms about how ambient levels of DEE particulate might affect electrical signals in the brain, and subsequently to how DEE particulate might alter disease risk, are premature.

  17. Enhancement by Nalidixic Acid of the Thermal Susceptibility of the Ts-7 Mutant of Escherichia Coli TAU-Bar

    Science.gov (United States)

    Nishida, Mikio; Mishima, Yukio; Kawada, Jun; Yielding, K. Lemone

    1975-01-01

    Nadilidixic acid at 5 × 10−6 M produced a substantial increase in thermal susceptibility of Ts-7, suggesting either that the thermal and nalidixic acid targets are identical or closely interdependent. PMID:1101825

  18. A route to hydroxylfluorenes: TsOH-mediated condensation reactions of 1,3-diketones with propargylic alcohols

    KAUST Repository

    Yao, Liangfeng; Tan, Davin; Miao, Xiaohe; Huang, Kuo-Wei

    2012-01-01

    An efficient method of preparing hydroxylfluorenes by TsOH-mediated tandem alkylation/rearrangements of propargylic alcohols with 1,3-diketones is described. These reactions are accomplished in moderate to good yields under mild conditions to offer

  19. Usuga tõe ja töö vabariiki / Matti Päts ; interv. Ants Sild

    Index Scriptorium Estoniae

    Päts, Matti, 1933-

    2003-01-01

    Patendiameti peadirektor Matti Päts vastab küsimustele, mis puudutavad Eesti Vabariiki selle 12. taasiseseisvumisaastal, eesti ajakirjandust, segadust ühiskonnas, kokkuhoidliku meelelaadi kadumist, insenerkonna vähest esindatust ühiskonnaelu juhtimises, maaelu

  20. Function and structure in phage Qbeta RNA replicase. Association of EF-Tu-Ts with the other enzyme subunits

    DEFF Research Database (Denmark)

    Blumenthal, T; Young, R A; Brown, S

    1976-01-01

    alters its quaternary structure: the EF-Tu-Ts cannot be covalently attached to the other enzyme subunits with bifunctional cross-linking reagents in the presence of RNA. This conformational change is not influenced by ionic strength. The addition of Qbeta RNA to the enzyme, does not result in the release...... for one another increases with increasing ionic strength. The enzyme is capable of initiation of RNA synthesis with synthetic templates only when in the low ionic strength conformation. Elongation of initiated polynucleotide chains is not affectedby ionic strength. Addition of Qbeta RNA to the enzyme also...... of EF-Tu-Ts from the other enzyme subunits: whereas free EF-Tu-Ts binds GDP independently of salt concentration, this binding by Qbeta replicase is sensitive to high ionic strength and remains so in the presence of Qbeta RNA. Furthermore, RNA does not allow the release of EF-Ts from EF-Tu by GTP...

  1. 78 FR 29209 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-05-17

    ... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... local distribution'' as set forth in the Federal Power Act (FPA). \\1\\ Revisions to Electric Reliability... Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ] 61,150, at P 16 (2010...

  2. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  3. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  4. Attentional function and basal forebrain cholinergic neuron morphology during aging in the Ts65Dn mouse model of Down syndrome.

    Science.gov (United States)

    Powers, Brian E; Velazquez, Ramon; Kelley, Christy M; Ash, Jessica A; Strawderman, Myla S; Alldred, Melissa J; Ginsberg, Stephen D; Mufson, Elliott J; Strupp, Barbara J

    2016-12-01

    Individuals with Down syndrome (DS) exhibit intellectual disability and develop Alzheimer's disease-like neuropathology during the third decade of life. The Ts65Dn mouse model of DS exhibits key features of both disorders, including impairments in learning, attention and memory, as well as atrophy of basal forebrain cholinergic neurons (BFCNs). The present study evaluated attentional function in relation to BFCN morphology in young (3 months) and middle-aged (12 months) Ts65Dn mice and disomic (2N) controls. Ts65Dn mice exhibited attentional dysfunction at both ages, with greater impairment in older trisomics. Density of BFCNs was significantly lower for Ts65Dn mice independent of age, which may contribute to attentional dysfunction since BFCN density was positively associated with performance on an attention task. BFCN volume decreased with age in 2N but not Ts65Dn mice. Paradoxically, BFCN volume was greater in older trisomic mice, suggestive of a compensatory response. In sum, attentional dysfunction occurred in both young and middle-aged Ts65Dn mice, which may in part reflect reduced density and/or phenotypic alterations in BFCNs.

  5. Third single energy market package of the EU Commission

    International Nuclear Information System (INIS)

    Heller, W.

    2008-01-01

    In adopting the so-called Third Single Energy Market Package on September 9, 2007, the European Commission has initiated a comprehensive reform of the single energy market. The main item of the package is the separation of generation and supply from the transmission grids and transport networks in the electricity and gas sectors (ownership unbundling), an approach favored by the Commission. On the other hand, the Commission wants to advance protection of the European market in case firms from third countries, to the extent in which they do not comply with the EU unbundling requirements, would want to assume control over an EU grid or network. The key points of the package are presented. The legal and entrepreneurial ramifications are discussed, for instance, under the aspect of protection of ownership, and concrete as well as potential concerns about ownership unbundling are voiced. (orig.)

  6. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  7. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  8. Commissioning Leibstadt nuclear power plant

    International Nuclear Information System (INIS)

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  9. Commission for Energy regulation (CRE) - Activity report June 2004

    International Nuclear Information System (INIS)

    2004-01-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2004 activity report of CRE. Content: A - Opening of the gas and electricity markets for professional customers on 1 July 2004; B - Regulation of the gas market: Gas markets and players (The European environment, The French gas market); Regulation of the gas market (Implementing regulation, Works planned for the coming year; C - Regulation of the electricity market: The electricity markets and players (The European electricity markets, The French electricity market, Monitoring the electricity market); Regulation of the French electricity market (Access to public grid, Cross-border exchanges, Un-bundled accounting principles); The public electricity service in the regulated market (Content of the public service, Public service charges, Electricity production public service financing, Electricity sales tariffs) D - The working of CRE: How CRE exercises its jurisdiction, Tools; E - Appendices: Glossary, Units and conversions, Council of European Energy Regulators, Index of tables and figures

  10. Commission for Energy regulation (CRE) - Activity report June 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2004 activity report of CRE. Content: A - Opening of the gas and electricity markets for professional customers on 1 July 2004; B - Regulation of the gas market: Gas markets and players (The European environment, The French gas market); Regulation of the gas market (Implementing regulation, Works planned for the coming year; C - Regulation of the electricity market: The electricity markets and players (The European electricity markets, The French electricity market, Monitoring the electricity market); Regulation of the French electricity market (Access to public grid, Cross-border exchanges, Un-bundled accounting principles); The public electricity service in the regulated market (Content of the public service, Public service charges, Electricity production public service financing, Electricity sales tariffs) D - The working of CRE: How CRE exercises its jurisdiction, Tools; E - Appendices: Glossary, Units and conversions, Council of European Energy Regulators, Index of tables and figures.

  11. Guidelines: the do's, don'ts and don't knows of feedback for clinical education.

    Science.gov (United States)

    Lefroy, Janet; Watling, Chris; Teunissen, Pim W; Brand, Paul

    2015-12-01

    The guidelines offered in this paper aim to amalgamate the literature on formative feedback into practical Do's, Don'ts and Don't Knows for individual clinical supervisors and for the institutions that support clinical learning. The authors built consensus by an iterative process. Do's and Don'ts were proposed based on authors' individual teaching experience and awareness of the literature, and the amalgamated set of guidelines were then refined by all authors and the evidence was summarized for each guideline. Don't Knows were identified as being important questions to this international group of educators which if answered would change practice. The criteria for inclusion of evidence for these guidelines were not those of a systematic review, so indicators of strength of these recommendations were developed which combine the evidence with the authors' consensus. A set of 32 Do and Don't guidelines with the important Don't Knows was compiled along with a summary of the evidence for each. These are divided into guidelines for the individual clinical supervisor giving feedback to their trainee (recommendations about both the process and the content of feedback) and guidelines for the learning culture (what elements of learning culture support the exchange of meaningful feedback, and what elements constrain it?) Feedback is not easy to get right, but it is essential to learning in medicine, and there is a wealth of evidence supporting the Do's and warning against the Don'ts. Further research into the critical Don't Knows of feedback is required. A new definition is offered: Helpful feedback is a supportive conversation that clarifies the trainee's awareness of their developing competencies, enhances their self-efficacy for making progress, challenges them to set objectives for improvement, and facilitates their development of strategies to enable that improvement to occur.

  12. A federated capability-based access control mechanism for internet of things (IoTs)

    Science.gov (United States)

    Xu, Ronghua; Chen, Yu; Blasch, Erik; Chen, Genshe

    2018-05-01

    The prevalence of Internet of Things (IoTs) allows heterogeneous embedded smart devices to collaboratively provide intelligent services with or without human intervention. While leveraging the large-scale IoT-based applications like Smart Gird and Smart Cities, IoT also incurs more concerns on privacy and security. Among the top security challenges that IoTs face is that access authorization is critical in resource and information protection over IoTs. Traditional access control approaches, like Access Control Lists (ACL), Role-based Access Control (RBAC) and Attribute-based Access Control (ABAC), are not able to provide a scalable, manageable and efficient mechanisms to meet requirement of IoT systems. The extraordinary large number of nodes, heterogeneity as well as dynamicity, necessitate more fine-grained, lightweight mechanisms for IoT devices. In this paper, a federated capability-based access control (FedCAC) framework is proposed to enable an effective access control processes to devices, services and information in large scale IoT systems. The federated capability delegation mechanism, based on a propagation tree, is illustrated for access permission propagation. An identity-based capability token management strategy is presented, which involves registering, propagation and revocation of the access authorization. Through delegating centralized authorization decision-making policy to local domain delegator, the access authorization process is locally conducted on the service provider that integrates situational awareness (SAW) and customized contextual conditions. Implemented and tested on both resources-constrained devices, like smart sensors and Raspberry PI, and non-resource-constrained devices, like laptops and smart phones, our experimental results demonstrate the feasibility of the proposed FedCAC approach to offer a scalable, lightweight and fine-grained access control solution to IoT systems connected to a system network.

  13. Report on the behalf of the joint commission in charge of proposing a text on arrangements still to be discussed in the bill project ratifying decrees nr 2016-1019 of 27 July 2016 related to electricity self-consumption and nr 2016-1059 of 3 August 2016 related to the production of electricity from renewable energies and aiming at adapting some arrangements related to electricity and gas networks and to renewable energies. National Assembly Nr 4443, Senate Nr 360

    International Nuclear Information System (INIS)

    Santais, Beatrice; Poniatowski, Ladislas

    2017-01-01

    This parliamentary publication contains the various comments and suggested modifications made by the commission on different articles of previously released but still to be discussed decrees which concern the evolution of the French legal framework for energy self-consumption and renewable energy production. A table compares the text adopted by the National Assembly in first reading and the one adopted by the Senate in first reading

  14. Application of ISO/TS 16949:2009 in Forest Products Industry

    OpenAIRE

    SEVİM KORKUT, Derya; SOLAK, Ertan

    2016-01-01

    The aim of the study is to present the short, medium and long term benefits of the activities in the basis of quality management development and in the context of ISO/TS 16949 Automotive Sub-Industry Quality Management System which determines the service standards of a forest products facility as an automotive sub-industry supplier, to be shown as an example to similar facilities. In this study which aims to present the facility’s character an examination has been done via supplier, productio...

  15. High precision wavelength measurements of X-ray lines emitted from TS-Tokamak plasmas

    Energy Technology Data Exchange (ETDEWEB)

    Platz, P. [Association Euratom-CEA, Centre d`Etudes de Cadarache, 13 - Saint-Paul-lez-Durance (France). Dept. de Recherches sur la Fusion Controlee; Cornille, M.; Dubau, J. [Observatoire de Paris, 92 - Meudon (France)

    1996-01-01

    X-ray line spectra from highly charged impurity ions have been taken with a high-resolution Bragg-crystal spectrometer on the Tore Supra (TS) tokamak. By cross-checking the wavelengths of reference lines from the heliumlike ions Ti20 + (2.6 Angstroms) and Ar16 + (3.95 Angstroms) we first demonstrate that it is possible to measure wavelengths with a precision, {lambda}/{delta}{lambda}, of better than 50000. We than determine the wavelengths of n=3 to n=2 transitions of neonlike Ag37+ in the 4 Angstroms spectral range. (authors). 16 refs., 7 figs., 3 tabs.

  16. Secretin radioimmunoassay using 125I-6-tyrosyl-secretin (6TS)

    International Nuclear Information System (INIS)

    Raptis, S.; Leitze, M.; Schlegel, W.; Pfeiffer, E.F.

    1975-01-01

    In radioimmunological determination of secretin difficulties are caused by the following two problems: firstly, in raising potent antibodies, and secondly in satisfactory labeling. All secretin RIAs described in the literature were carried out with traditional synthetic secretin (Young, Lazarus, Chisholm and Atkinson 1968; Boden and Chey 1973; Holohan, Murphy, Buchanan and Elmore 1973; Boehm, Lee and Chey 1974). Our study describes the development of an assay with sufficient sensitivity to measure circulating immunoreactive secretin in human blood, by using 125 I-6-TS, which is a product of Schwarz and Mann/USA (SM). (orig.) [de

  17. Dos and Don’ts for butterflies of the Habitats Directive of the European Union

    Directory of Open Access Journals (Sweden)

    Chris van Swaay

    2012-03-01

    Full Text Available Twenty-nine butterfly species are listed on the Annexes of the Habitats Directive. To assist everyone who wants or needs to take action for one of these species, we compiled an overview of the habitat requirements and ecology of each species, as well as information on their conservation status in Europe. This was taken from the recent Red List and their main biogeographical regions (taken from the first reporting on Article 17 of the Directive. Most important are the Dos and Don`ts, which summarize in a few bullet points what to do and what to avoid in order to protect and conserve these butterflies and their habitats.

  18. Alignment of CT-PPS detectors in 2016, before TS2

    CERN Document Server

    Kaspar, J

    2017-01-01

    This note presents the first alignment of the CMS-TOTEM Precision Proton Spectrometer (CT-PPS) using the data from before Technical Stop 2 (TS2), 2016. This new procedure involves two stages. In the first one, data from a special calibration fill are used. In this fill, both horizontal and vertical Roman Pots (RPs) were inserted very close to the beam. In the second stage, hit distributions from physics fills (with only horizontal RPs inserted) are matched to the previously aligned reference from the calibration fill. The alignment and optics calibration is verified by reconstructing consistent $\\xi$ spectra from different RPs and LHC fills.

  19. Experimental-laboratory studies of a composition based on TS-10 resin designed for insulation operations

    Energy Technology Data Exchange (ETDEWEB)

    Vyazel' shchikov, V M; Glukhov, A M

    1979-01-01

    Results are presented from studying the technological parameters of a strengthened argillaceous solution (SAS) conducted using the method of planning partial experiments. Particular empirical relationships are found which provide a concept about the degree of influence of each of the SAS components (TS-10 resins of paraform, water, clay) on the rate of structure-formation and mechanical strength. Summary relationships are obtained: the time for viscosity to reach 500% cP-SAS composition and ultimate compression strength SAS composition which can be used in selecting the formula for the mixture for the insulation operations in an ''cold'' well.

  20. International trade with electric power

    OpenAIRE

    Årdal, Frode

    2009-01-01

    In 2003 the European Commission introduced the Directive 2003/54/EC and Regulation 1228/2003/EC which increased the focus on the liberalization of the European electricity market. The international electricity trade has increased and created new challenges related to cross-border transmission and compensation mechanisms. The focus of the report has been to discuss the development of the electricity market in Europe, and the status of international exchange. The report also discusses the con...

  1. Synthesis of mesoporous TS-1 using a hybrid SiO{sub 2}–TiO{sub 2} xerogel for catalytic oxidative desulfurization

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Seung-Tae [Department of Chemical Engineering, Inha University, Incheon 402-751 (Korea, Republic of); Jeong, Kwang-Eun; Jeong, Soon-Yong [Research Center for Green Catalysis, Division of Green Chemistry and Engineering Research, Korea Research Institute of Chemical Technology, P.O. Box 107, 141 Gajeong-ro, Yuseong, Daejeon 305-600 (Korea, Republic of); Ahn, Wha-Seung, E-mail: whasahn@inha.ac.kr [Department of Chemical Engineering, Inha University, Incheon 402-751 (Korea, Republic of)

    2012-12-15

    Graphical abstract: Display Omitted Highlights: ► Meso-TS-1 catalyst was synthesized using a SiO{sub 2}–TiO{sub 2} xerogel with an organosilane precursor. ► Hierarchical pore structure was confirmed by characterization of the materials. ► Catalytic activity was tested using oxidative desulfurization of the model sulfur compounds. ► Meso-TS-1 demonstrated significantly improved catalytic activity than TS-1. -- Abstract: Mesoporous TS-1 (M-TS-1) was synthesized using a hybrid SiO{sub 2}–TiO{sub 2} xerogel combined with an organosilane precursor. Prepared samples were characterized by XRD, UV–vis spectroscopy, SEM, and N{sub 2} adsorption–desorption measurement. M-TS-1, prepared in 2 days, showed high crystallinity and the best textural properties among the samples. The N{sub 2} adsorption–desorption isotherms of M-TS-1 exhibited a hysteresis loop at pressure higher than P/P{sub 0} = 0.4, clearly indicating the existence of mesopores. M-TS-1 has significantly larger mesopore volume (0.48 cm{sup 3}/g) than that of conventional TS-1 (0.07 cm{sup 3}/g), and showed a narrow peak centered at ca. 6.3 nm. In the oxidative desulfurization reaction, M-TS-1 was more active than conventional TS-1 at the same Ti-loading; M-TS-1 produced a dibenzothiophene (DBT) conversion of 96%, whereas conventional TS-1 produced a final DBT conversion of 5.6% after a reaction time of 180 min. Oxidative desulfurization over TS-1 was influenced both by electron density and steric hindrance in the sulfur compounds tested.

  2. Synthesis of mesoporous TS-1 using a hybrid SiO2–TiO2 xerogel for catalytic oxidative desulfurization

    International Nuclear Information System (INIS)

    Yang, Seung-Tae; Jeong, Kwang-Eun; Jeong, Soon-Yong; Ahn, Wha-Seung

    2012-01-01

    Graphical abstract: Display Omitted Highlights: ► Meso-TS-1 catalyst was synthesized using a SiO 2 –TiO 2 xerogel with an organosilane precursor. ► Hierarchical pore structure was confirmed by characterization of the materials. ► Catalytic activity was tested using oxidative desulfurization of the model sulfur compounds. ► Meso-TS-1 demonstrated significantly improved catalytic activity than TS-1. -- Abstract: Mesoporous TS-1 (M-TS-1) was synthesized using a hybrid SiO 2 –TiO 2 xerogel combined with an organosilane precursor. Prepared samples were characterized by XRD, UV–vis spectroscopy, SEM, and N 2 adsorption–desorption measurement. M-TS-1, prepared in 2 days, showed high crystallinity and the best textural properties among the samples. The N 2 adsorption–desorption isotherms of M-TS-1 exhibited a hysteresis loop at pressure higher than P/P 0 = 0.4, clearly indicating the existence of mesopores. M-TS-1 has significantly larger mesopore volume (0.48 cm 3 /g) than that of conventional TS-1 (0.07 cm 3 /g), and showed a narrow peak centered at ca. 6.3 nm. In the oxidative desulfurization reaction, M-TS-1 was more active than conventional TS-1 at the same Ti-loading; M-TS-1 produced a dibenzothiophene (DBT) conversion of 96%, whereas conventional TS-1 produced a final DBT conversion of 5.6% after a reaction time of 180 min. Oxidative desulfurization over TS-1 was influenced both by electron density and steric hindrance in the sulfur compounds tested.

  3. Energy Regulation Commission. Activity report. 1 July - 31 December 2008

    International Nuclear Information System (INIS)

    2009-01-01

    After a description of the scope of activities, organisation and operation of the CRE (Commission de Regulation de l'Energie, Energy regulation commission) and of the CorDIS (Comite de reglement des differents et des sanctions de la CRE, CRE's Committee for settlements of controversies and sanctions), this report outlines the importance of the grid manager independence and of the regulation reinforcement for the building up of a domestic energy market. It discusses the role of the regulation authority in the interconnection of European grids, their operation security and supply security, but also in pricing and in investments. It highlights the relationship between the reduction of carbon emission, energy demand management, strengthening of electric grids, financial incentives, and advanced metering systems. It describes how the CRE ensures a good operation of electricity and natural gas markets

  4. Decision from the Commission of Electricity Regulation (CRE) dated from December 12, 2002 about a disagreement between PEM Abrasif Refractaires (PEMAR) company and the Power transportation Network (RTE), as manager of the public power transportation grid, relative to the tariffing of public networks use applicable to the consumers connected in 42 kV voltage; Decision de la Commission de Regulation de l'Electricite (CRE) en date du 12 decembre 2002 sur un different qui oppose la societe PEM Abrasif Refractaires (PEMAR) a Reseau de Transport d'Electricite (RTE), en tant que gestionnaire du reseau public de transport d'electricite, relatif a la tarification d'utilisation des reseaux publics applicable aux consommateurs raccordes en tension 42 kV

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-01

    This document presents the analysis made by the French commission of electricity regulation (CRE) about a high voltage tariff disagreement between PEM Abrasif Refractaires (PEMAR) company (La Defense, Courbevoie France) and RTE, the French manager of the power transportation grid. PEMAR company claims for a contract of power supply tariff conformable with the application of the decree from July 19, 2002 which, after comparison with the previous decrees, contains a mistake in the definition of voltage classes. (J.S.)

  5. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  6. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    International Nuclear Information System (INIS)

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  7. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  8. Netherlands Electricity Regulatory Service DTe. Internet site

    International Nuclear Information System (INIS)

    1999-01-01

    The implementation of the Dutch Electricity Law and the observance of compliance with the law is commissioned to the Netherlands Electricity Regulatory Service DTe. Their Internet site contains several full-text documents related to the tasks of DTe (mainly with respect to tariffs and transportation of electricity)

  9. 77 FR 69614 - Commission Information Collection Activities (FERC-714); Comment Request

    Science.gov (United States)

    2012-11-20

    ... planning areas with annual peak demand over 200 MW. Estimate of Annual Burden: \\1\\ The Commission estimates... submitting the information collection FERC-714 (Annual Electric Balancing Authority Area and Planning Area... Electric Balancing Authority Area and Planning Area Report. OMB Control No.: 1902-0140. Type of Request...

  10. Second Generation HTs Wire Based on RABiTS Substrates and MOD YBCO

    Energy Technology Data Exchange (ETDEWEB)

    Schoop, U. [American Superconductor Corporation, Westborough, MA; Rupich, Marty [American Superconductor Corporation, Westborough, MA; Thieme, C. L. H. [American Superconductor Corporation, Westborough, MA; Verebelyi, D. T. [American Superconductor Corporation, Westborough, MA; Zhang, W. [American Superconductor Corporation, Westborough, MA; Li, Xiaoping [American Superconductor Corporation, Westborough, MA; Kodenkandath, Thomas [American Superconductor Corporation, Westborough, MA; Nguyen, N. [American Superconductor Corporation, Westborough, MA; Siegal, E. E. [American Superconductor Corporation, Westborough, MA; Civale, L. [Los Alamos National Laboratory (LANL); Holesinger, T. G. [Los Alamos National Laboratory (LANL); Maiorov, B. [Los Alamos National Laboratory (LANL); Goyal, Amit [ORNL; Paranthaman, Mariappan Parans [ORNL

    2005-01-01

    The performance of Second Generation (2G) high temperature superconducting wire manufactured by continuous reel-to-reel processes is nearing the 300 A/cm-width (77 K, self field) performance threshold for commercial power cable applications. The 2G manufacturing approach under development at American Superconductor is based on the combination of the RABiTS substrate-buffer technology with metal organic deposition (MOD) of the YBCO layer. The capability of this process has been demonstrated in multiple 10 meter lengths with critical currents exceeding 250 A/cm-width with high uniformity and reproducibility. Critical currents of 380 A/cm-width have been achieved in short length samples prepared by the same basic process. The incorporation of nanoparticles ('nanodots') into the YBCO layer using the MOD process has resulted in a 2-fold improvement in the critical current at 65 K in a 3 T field. The research and development focus at ASMC is now directed toward the economical scale-up of the RABiTS/MOD process, optimization of the conductor properties for targeted applications and the use of 2G wire in initial demonstration applications.

  11. Oxidation of Catechol using Titanium Silicate (TS-1 Catalyst: Modeling and Optimization

    Directory of Open Access Journals (Sweden)

    Sonali Sengupta

    2013-12-01

    Full Text Available The oxidation of catechol was studied in an eco-friendly process with commercial titanium silicate-1 (TS-1 catalyst and hydrogen peroxide as oxidant in absence of all mass transfer effects. The process was opti-mized by Box-Behnken design in terms of three independent process variables such as reaction tempera-ture, moles of hydrogen peroxide per mole of catechol and catalyst amount whose optimum values of the process variables were found to be 60 °C, 13.2 and 1.24 g respectively for maximum conversion of 75.8 %. The effects of different process parameters such as mole ratio of hydrogen peroxide to catechol, catalyst par-ticle size, catalyst amount, temperature and reaction time were studied. A pseudo first order kinetic model was fitted with the experimental rate data. The apparent activation energy for the reaction was found to be 11.37 kJ/mole.  © 2013 BCREC UNDIP. All rights reservedReceived: 22nd April 2013; Revised: 25th October 2013; Accepted: 1st November 2013[How to Cite: Sengupta, S., Ghosal, D., Basu, J.K. (2013. Oxidation of Catechol using Titanium Silicate (TS-1 Catalyst: Modeling and Optimization. Bulletin of Chemical Reaction Engineering & Catalysis, 8 (2: 167-177. (doi:10.9767/bcrec.8.2.4759.167-177][Permalink/DOI: http://dx.doi.org/10.9767/bcrec.8.2.4759.167-177

  12. Impôts en France : réunion publique le mercredi 19 mars 2014

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    Impôts en France : réunion publique le mercredi 19 mars 2014 Une réunion publique aura lieu le mercredi 19 mars de 13h à 15h dans l’amphithéâtre principal (500/1-001). Au cours de cette réunion, MM. Jean-Louis Brandolin et Gérard Polizzi, respectivement responsable et responsable-adjoint du Service des impôts des particuliers et des entreprises de Bellegarde, Centre des finances publiques, apporteront leur expertise au sujet de l’imposition des membres du personnel du CERN domiciliés en France. Seront à l’ordre du jour les questions de principe que se posent apparemment de nombreux membres du personnel : par exemple, la définition du domicile fiscal, le contenu de la déclaration de revenus (mention des revenus CERN et déclaration des autres revenus de sources française ou étrangère), la déclaration des comptes bancaires à l’étranger, l’assujettissement (dans certaines conditions) à la CSG-CRDS. Cette réunion publique portera UNIQUEMENT sur des questions de principe ...

  13. Adaptive Controller for 6-DOF Parallel Robot Using T-S Fuzzy Inference

    Directory of Open Access Journals (Sweden)

    Xue Jian

    2013-02-01

    Full Text Available 6-DOF parallel robot always appears in the form of Stewart platform. It has been widely used in industry for the benefits such as strong structural stiffness, high movement accuracy and so on. Space docking technology makes higher requirements of motion accuracy and dynamic performance to the control method on 6-DOF parallel robot. In this paper, a hydraulic 6-DOF parallel robot was used to simulate the docking process. Based on this point, this paper gave a thorough study on the design of an adaptive controller to eliminate the asymmetric of controlled plant and uncertain load force interference. Takagi-Sugeno (T-S fuzzy inference model was used to build the fuzzy adaptive controller. With T-S model, the controller directly imposes adaptive control signal on the plant to make sure that the output of plant could track the reference model output. The controller has simple structure and is easy to implement. Experiment results show that the controller can eliminate asymmetric and achieve good dynamic performance, and has good robustness to load interference.

  14. BiGGEsTS: integrated environment for biclustering analysis of time series gene expression data

    Directory of Open Access Journals (Sweden)

    Madeira Sara C

    2009-07-01

    Full Text Available Abstract Background The ability to monitor changes in expression patterns over time, and to observe the emergence of coherent temporal responses using expression time series, is critical to advance our understanding of complex biological processes. Biclustering has been recognized as an effective method for discovering local temporal expression patterns and unraveling potential regulatory mechanisms. The general biclustering problem is NP-hard. In the case of time series this problem is tractable, and efficient algorithms can be used. However, there is still a need for specialized applications able to take advantage of the temporal properties inherent to expression time series, both from a computational and a biological perspective. Findings BiGGEsTS makes available state-of-the-art biclustering algorithms for analyzing expression time series. Gene Ontology (GO annotations are used to assess the biological relevance of the biclusters. Methods for preprocessing expression time series and post-processing results are also included. The analysis is additionally supported by a visualization module capable of displaying informative representations of the data, including heatmaps, dendrograms, expression charts and graphs of enriched GO terms. Conclusion BiGGEsTS is a free open source graphical software tool for revealing local coexpression of genes in specific intervals of time, while integrating meaningful information on gene annotations. It is freely available at: http://kdbio.inesc-id.pt/software/biggests. We present a case study on the discovery of transcriptional regulatory modules in the response of Saccharomyces cerevisiae to heat stress.

  15. Commission of energy regulation. 2004 activity report; Commission de regulation de l'energie. Rapport d'activite 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  16. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  17. 78 FR 13097 - Electric Power Research Institute; Seismic Evaluation Guidance

    Science.gov (United States)

    2013-02-26

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0038] Electric Power Research Institute; Seismic... Electric Power Research Institute (EPRI)-1025287, ``Seismic Evaluation Guidance: Screening, Prioritization... guidance and clarification of an acceptable approach to assist nuclear power reactor licensees when...

  18. Commission for Energy regulation (CRE) - Activity report June 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2007 activity report of CRE. Content: A - Towards a single European energy market: Birth of a single European energy market (Origins of Europe of Energy, Emergence of a European energy policy); Main European Community guiding lines (European governance as regards energy, Guiding principles for the internal energy market); European Community activities (European Commission reports, Electricity and gas Regional Initiatives); Organisation and coordination of European regulators (Joint organisation of European regulators, CRE's relations with European Community institutions); CRE's European activities (Regional integration of gas markets, Regional integration of electricity markets, Operation of the European interconnected electricity grid and security of supply, CRE's other European activities); B - CRE action at national level: Grids/networks and infrastructures (General information, Electricity grids, Regulation of gas networks and infrastructures); Markets (Changes in the regulatory and legislative contexts of electricity and natural gas markets, Electricity markets

  19. Commission for Energy regulation (CRE) - Activity report June 2007

    International Nuclear Information System (INIS)

    2007-01-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2007 activity report of CRE. Content: A - Towards a single European energy market: Birth of a single European energy market (Origins of Europe of Energy, Emergence of a European energy policy); Main European Community guiding lines (European governance as regards energy, Guiding principles for the internal energy market); European Community activities (European Commission reports, Electricity and gas Regional Initiatives); Organisation and coordination of European regulators (Joint organisation of European regulators, CRE's relations with European Community institutions); CRE's European activities (Regional integration of gas markets, Regional integration of electricity markets, Operation of the European interconnected electricity grid and security of supply, CRE's other European activities); B - CRE action at national level: Grids/networks and infrastructures (General information, Electricity grids, Regulation of gas networks and infrastructures); Markets (Changes in the regulatory and legislative contexts of electricity and natural gas markets, Electricity markets, Natural gas

  20. Guidance on future art commissioning.

    Science.gov (United States)

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  1. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  2. Report of the disarmament commission

    International Nuclear Information System (INIS)

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  3. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  5. German energy prices top the scale as Commission examines price transparency

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The results of the price transparency directive indicate clearly that gas and electricity prices to both large and small consumers vary widely between member states. And one message which will hit home to large industrial consumers of gas and electricity when they examine the Commission's recent analysis is that relocating or setting up a subsidiary in Germany is a decision which must be taken with care. The Commission's first attempt to examine the directive's operation reveals that the majority of gas and electricity prices in Germany are higher than those in the bulk of other member states. While the reasons for this are known - for electricity it is mainly due to the Kohlepfennig, a surcharge added to power bills to support the uneconomic coal industry -the Commission's analysis focuses on the price difference between member states rather than the various reasons - tariff policy, taxes, environmental costs - for the difference. (Author)

  6. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  7. Sensor Fault Diagnosis Observer for an Electric Vehicle Modeled as a Takagi-Sugeno System

    Directory of Open Access Journals (Sweden)

    S. Gómez-Peñate

    2018-01-01

    Full Text Available A sensor fault diagnosis of an electric vehicle (EV modeled as a Takagi-Sugeno (TS system is proposed. The proposed TS model considers the nonlinearity of the longitudinal velocity of the vehicle and parametric variation induced by the slope of the road; these considerations allow to obtain a mathematical model that represents the vehicle for a wide range of speeds and different terrain conditions. First, a virtual sensor represented by a TS state observer is developed. Sufficient conditions are given by a set of linear matrix inequalities (LMIs that guarantee asymptotic convergence of the TS observer. Second, the work is extended to perform fault detection and isolation based on a generalized observer scheme (GOS. Numerical simulations are presented to show the performance and applicability of the proposed method.

  8. TS gene polymorphisms are not good markers of response to 5-FU therapy in stage III colon cancer patients.

    Science.gov (United States)

    Fariña-Sarasqueta, A; Gosens, M J E M; Moerland, E; van Lijnschoten, I; Lemmens, V E P P; Slooter, G D; Rutten, H J T; van den Brule, Adriaan J C

    2011-08-01

    Although the predictive and prognostic value of thymidylate synthase (TS) expression and gene polymorphism in colon cancer has been widely studied, the results are inconclusive probably because of methodological differences. With this study, we aimed to elucidate the role of TS gene polymorphisms genotyping in therapy response in stage III colon carcinoma patients treated with 5-FU adjuvant chemotherapy. 251 patients diagnosed with stage III colon carcinoma treated with surgery followed by 5-FU based adjuvant therapy were selected. The variable number of tandem repeats (VNTR) and the single nucleotide polymorphism (SNP) in the 5'untranslated region of the TS gene were genotyped. There was a positive association between tumor T stage and the VNTR genotypes (p = 0.05). In both univariate and multivariate survival analysis no effects of the studied polymorphisms on survival were found. However, there was an association between both polymorphisms and age. Among patients younger than 60 years, the patients homozygous for 2R seemed to have a better overall survival, whereas among the patients older than 67 this longer survival was seen by the carriers of other genotypes. We conclude that the TS VNTR and SNP do not predict response to 5-FU therapy in patients with stage III colon carcinoma. However, age appears to modify the effects of TS polymorphisms on survival.

  9. Interstitial lung disease caused by TS-1: a case of long-term drug retention as a fatal adverse reaction.

    Science.gov (United States)

    Park, Joong-Min; Hwang, In Gyu; Suh, Suk-Won; Chi, Kyong-Choun

    2011-12-01

    TS-1 is an oral anti-cancer agent for gastric cancer with a high response rate and low toxicity. We report a case of long-term drug retention of TS-1 causing interstitial lung disease (ILD) as a fatal adverse reaction. A 65-year-old woman underwent a total gastrectomy with pathologic confirmation of gastric adenocarcinoma. She received 6 cycles of TS-1 and low-dose cisplatin for post-operative adjuvant chemotherapy followed by single-agent maintenance therapy with TS-1. After 8 months, the patient complained of a productive cough with sputum and mild dyspnea. A pulmonary evaluation revealed diffuse ILD in the lung fields, bilaterally. In spite of discontinuing chemotherapy and the administration of corticosteroids, the pulmonary symptoms did not improve, and the patient died of pulmonary failure. TS-1-induced ILD can be caused by long-term drug retention that alters the lung parenchyma irreversibly, the outcome of which can be life-threatening. Pulmonary evaluation for early detection of disease is recommended.

  10. A Combination of TsHARP and Thin Plate Spline Interpolation for Spatial Sharpening of Thermal Imagery

    Directory of Open Access Journals (Sweden)

    Xuehong Chen

    2014-03-01

    Full Text Available There have been many studies and much attention paid to spatial sharpening for thermal imagery. Among them, TsHARP, based on the good correlation between vegetation index and land surface temperature (LST, is regarded as a standard technique because of its operational simplicity and effectiveness. However, as LST is affected by other factors (e.g., soil moisture in the areas with low vegetation cover, these areas cannot be well sharpened by TsHARP. Thin plate spline (TPS is another popular downscaling technique for surface data. It has been shown to be accurate and robust for different datasets; however, it has not yet been attempted in thermal sharpening. This paper proposes to combine the TsHARP and TPS methods to enhance the advantages of each. The spatially explicit errors of these two methods were firstly estimated in theory, and then the results of TPS and TsHARP were combined with the estimation of their errors. The experiments performed across various landscapes and data showed that the proposed combined method performs more robustly and accurately than TsHARP.

  11. The Prediction of the Gas Utilization Ratio based on TS Fuzzy Neural Network and Particle Swarm Optimization.

    Science.gov (United States)

    Zhang, Sen; Jiang, Haihe; Yin, Yixin; Xiao, Wendong; Zhao, Baoyong

    2018-02-20

    Gas utilization ratio (GUR) is an important indicator that is used to evaluate the energy consumption of blast furnaces (BFs). Currently, the existing methods cannot predict the GUR accurately. In this paper, we present a novel data-driven model for predicting the GUR. The proposed approach utilized both the TS fuzzy neural network (TS-FNN) and the particle swarm algorithm (PSO) to predict the GUR. The particle swarm algorithm (PSO) is applied to optimize the parameters of the TS-FNN in order to decrease the error caused by the inaccurate initial parameter. This paper also applied the box graph (Box-plot) method to eliminate the abnormal value of the raw data during the data preprocessing. This method can deal with the data which does not obey the normal distribution which is caused by the complex industrial environments. The prediction results demonstrate that the optimization model based on PSO and the TS-FNN approach achieves higher prediction accuracy compared with the TS-FNN model and SVM model and the proposed approach can accurately predict the GUR of the blast furnace, providing an effective way for the on-line blast furnace distribution control.

  12. 76 FR 61687 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2479-011-CA] Pacific Gas and Electric Company Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission...

  13. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  14. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  15. 76 FR 35208 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2310-193--California; Project No. 2266-102--California] Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review On July 6-8, 2011, the Federal Energy Regulatory Commission (Commission) staff and the Pacific Gas and Electric Company ...

  16. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  17. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  18. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  19. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  20. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  1. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  2. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  3. Protein dynamics associated with failed and rescued learning in the Ts65Dn mouse model of Down syndrome.

    Directory of Open Access Journals (Sweden)

    Md Mahiuddin Ahmed

    Full Text Available Down syndrome (DS is caused by an extra copy of human chromosome 21 (Hsa21. Although it is the most common genetic cause of intellectual disability (ID, there are, as yet, no effective pharmacotherapies. The Ts65Dn mouse model of DS is trisomic for orthologs of ∼55% of Hsa21 classical protein coding genes. These mice display many features relevant to those seen in DS, including deficits in learning and memory (L/M tasks requiring a functional hippocampus. Recently, the N-methyl-D-aspartate (NMDA receptor antagonist, memantine, was shown to rescue performance of the Ts65Dn in several L/M tasks. These studies, however, have not been accompanied by molecular analyses. In previous work, we described changes in protein expression induced in hippocampus and cortex in control mice after exposure to context fear conditioning (CFC, with and without memantine treatment. Here, we extend this analysis to Ts65Dn mice, measuring levels of 85 proteins/protein modifications, including components of MAP kinase and MTOR pathways, and subunits of NMDA receptors, in cortex and hippocampus of Ts65Dn mice after failed learning in CFC and after learning was rescued by memantine. We show that, compared with wild type littermate controls, (i of the dynamic responses seen in control mice in normal learning, >40% also occur in Ts65Dn in failed learning or are compensated by baseline abnormalities, and thus are considered necessary but not sufficient for successful learning, and (ii treatment with memantine does not in general normalize the initial protein levels but instead induces direct and indirect responses in approximately half the proteins measured and results in normalization of the endpoint protein levels. Together, these datasets provide a first view of the complexities associated with pharmacological rescue of learning in the Ts65Dn. Extending such studies to additional drugs and mouse models of DS will aid in identifying pharmacotherapies for effective

  4. Hematopoietic Stem Cells from Ts65Dn Mice Are Deficient in the Repair of DNA Double-Strand Breaks.

    Science.gov (United States)

    Wang, Yingying; Chang, Jianhui; Shao, Lijian; Feng, Wei; Luo, Yi; Chow, Marie; Du, Wei; Meng, Aimin; Zhou, Daohong

    2016-06-01

    Down syndrome (DS) is a genetic disorder caused by the presence of an extra partial or whole copy of chromosome 21. In addition to musculoskeletal and neurodevelopmental abnormalities, children with DS exhibit various hematologic disorders and have an increased risk of developing acute lymphoblastic leukemia and acute megakaryocytic leukemia. Using the Ts65Dn mouse model, we investigated bone marrow defects caused by trisomy for 132 orthologs of the genes on human chromosome 21. The results showed that, although the total bone marrow cellularity as well as the frequency of hematopoietic progenitor cells (HPCs) was comparable between Ts65Dn mice and their age-matched euploid wild-type (WT) control littermates, human chromosome 21 trisomy led to a significant reduction in hematopoietic stem cell (HSC) numbers and clonogenic function in Ts65Dn mice. We also found that spontaneous DNA double-strand breaks (DSBs) were significantly increased in HSCs from the Ts65Dn mice, which was correlated with the significant reduction in HSC clonogenic activity compared to those from WT controls. Moreover, analysis of the repair kinetics of radiation-induced DSBs revealed that HSCs from Ts65Dn mice were less proficient in DSB repair than the cells from WT controls. This deficiency was associated with a higher sensitivity of Ts65Dn HSCs to radiation-induced suppression of HSC clonogenic activity than that of euploid HSCs. These findings suggest that an additional copy of genes on human chromosome 21 may selectively impair the ability of HSCs to repair DSBs, which may contribute to DS-associated hematological abnormalities and malignancies.

  5. Commissioning Instrument for the GTC

    Science.gov (United States)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  6. Risk based definition of TS requirements for NPPs with WWER-1000 type reactor

    International Nuclear Information System (INIS)

    Morozov, V.; Tokmachev, G.

    2000-01-01

    The main regulations in safety related maintenance for NPPs in Russia are defined as a part of Technical Specifications (TSs). It includes limiting conditions for operation (surveillance requirements, allowed outage time, et.). In Russian practice the two levels of TSs are presented: general TSs that have been established as a master documents for similar designed NPPs and plant specific based on operation practice of each NPP unit. This paper presents a brief review of submissions to TS changes for NPPs with WWER type reactor were issued by AEP PSA team since 1988 year. Besides it provides an approach allows to estimate the complex affect on plant risk for both Limiting Conditions of Operation (LCO) and Surveillance Test Intervals (STI) based on relevant probabilistic tool (Minimal Cut Sets method and Marcov Chains methods). (author)

  7. Ethnicity, development and gender: Tsáchila indigenous women in Ecuador.

    Science.gov (United States)

    Radcliffe, Sarah; Pequeño, Andrea

    2010-01-01

    In recent decades, indigenous populations have become the subjects and agents of development in national and international multicultural policy that acknowledges poverty among indigenous peoples and their historic marginalization from power over development. Although the impact of these legal and programmatic efforts is growing, one persistent axis of disadvantage, male–female difference, is rarely taken into account in ethno-development policy and practice. This article argues that assumptions that inform policy related to indigenous women fail to engage with indigenous women's development concerns. The institutional separation between gender and development policy (GAD) and multiculturalism means that provisions for gender in multicultural policies are inadequate, and ethnic rights in GAD policies are invisible. Drawing on post-colonial feminism, the paper examines ethnicity and gender as interlocking systems that structure indigenous women's development experiences. These arguments are illustrated in relation to the case of the Tsáchila ethno-cultural group in the South American country of Ecuador.

  8. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  9. 78 FR 29159 - Electric Power Research Institute; Seismic Evaluation Guidance

    Science.gov (United States)

    2013-05-17

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0038] Electric Power Research Institute; Seismic... U.S. Nuclear Regulatory Commission (NRC) is issuing an endorsement letter of Electric Power Research... Fukushima Dai-ichi nuclear power plant in March 2011. Enclosure 1 to the 50.54(f) letter requests licensees...

  10. An expert protocol for immunofluorescent detection of calcium channels in tsA-201 cells.

    Science.gov (United States)

    Koch, Peter; Herzig, Stefan; Matthes, Jan

    Pore-forming subunits of voltage gated calcium channels (VGCC) are large membrane proteins (260kDa) containing 24 transmembrane domains. Despite transfection with viral promoter driven vectors, biochemical analysis of VGCC is often hampered by rather low expression levels in heterologous systems rendering VGCC challenging targets. Especially in immunofluorescent detection, calcium channels are demanding proteins. We provide an expert step-by-step protocol with adapted conditions for handling procedures (tsA-201 cell culture, transient transfection, incubation time and temperature at 28°C or 37°C and immunostaining) to address the L-type calcium-channel pore Ca v 1.2 in an immunofluorescent approach. We performed immunocytochemical analysis of Ca v 1.2 expression at single-cell level in combination with detection of different markers for cellular organelles. We show confluency levels and shapes of tsA-201 cells at different time points during an experiment. Our experiments reveal sufficient levels of Ca v 1.2 protein and a correct Ca v 1.2 expression pattern in polygonal shaped cells already 12h after transfection. A sequence of elaborated protocol modifications allows subcellular localization analysis of Ca v 1.2 in an immunocytochemical approach. We provide a protocol that may be used to achieve insights into physiological and pathophysiological processes involving voltage gated calcium channels. Our protocol may be used for expression analysis of other challenging proteins and efficient overexpression may be exploited in related biochemical techniques requiring immunolabels. Copyright © 2016 Elsevier Inc. All rights reserved.

  11. HAfTs are novel lncRNA transcripts from aflatoxin exposure.

    Directory of Open Access Journals (Sweden)

    B Alex Merrick

    Full Text Available The transcriptome can reveal insights into precancer biology. We recently conducted RNA-Seq analysis on liver RNA from male rats exposed to the carcinogen, aflatoxin B1 (AFB1, for 90 days prior to liver tumor onset. Among >1,000 differentially expressed transcripts, several novel, unannotated Cufflinks-assembled transcripts, or HAfTs (Hepatic Aflatoxin Transcripts were found. We hypothesized PCR-cloning and RACE (rapid amplification of cDNA ends could further HAfT identification. Sanger data was obtained for 6 transcripts by PCR and 16 transcripts by 5'- and 3'-RACE. BLAST alignments showed, with two exceptions, HAfT transcripts were lncRNAs, >200nt without apparent long open reading frames. Six rat HAfT transcripts were classified as 'novel' without RefSeq annotation. Sequence alignment and genomic synteny showed each rat lncRNA had a homologous locus in the mouse genome and over half had homologous loci in the human genome, including at least two loci (and possibly three others that were previously unannotated. While HAfT functions are not yet clear, coregulatory roles may be possible from their adjacent orientation to known coding genes with altered expression that include 8 HAfT-gene pairs. For example, a unique rat HAfT, homologous to Pvt1, was adjacent to known genes controlling cell proliferation. Additionally, PCR and RACE Sanger sequencing showed many alternative splice variants and refinements of exon sequences compared to Cufflinks assembled transcripts and gene prediction algorithms. Presence of multiple splice variants and short tandem repeats found in some HAfTs may be consequential for secondary structure, transcriptional regulation, and function. In summary, we report novel, differentially expressed lncRNAs after exposure to the genotoxicant, AFB1, prior to neoplastic lesions. Complete cloning and sequencing of such transcripts could pave the way for a new set of sensitive and early prediction markers for chemical

  12. Development and validation of the functional assessment of chronic illness therapy treatment satisfaction (FACIT TS) measures.

    Science.gov (United States)

    Peipert, John D; Beaumont, Jennifer L; Bode, Rita; Cella, Dave; Garcia, Sofia F; Hahn, Elizabeth A

    2014-04-01

    To develop and validate a new functional assessment of chronic illness therapy (FACIT) measure of satisfaction with treatment for chronic illnesses such as cancer and HIV/AIDS. To define domains and generate items, a literature review informed creation of semi-structured interview guides for patients and an international expert panel of clinicians and researchers. Patients and experts also rated 15 areas of satisfaction for relevance. The final list of items underwent further refinement by the original expert panel and a new group of clinical experts. Items were tested in four studies (primarily lung cancer) and data were pooled for analysis. Exploratory and confirmatory factor analyses (CFA), and item response theory modeling were conducted to evaluate dimensionality. Internal consistency reliability and test-retest reliability were both evaluated. Validity was evaluated by correlating the FACIT subscale scores and measures of comparable concepts and by testing the scales' ability to distinguish people according to their overall treatment satisfaction. Two instruments were created: the FACIT TS-general (G), an overall evaluation of current treatment, and the FACIT TS-patient satisfaction (PS), a measure of patient satisfaction. CFA results were not optimal for a five-factor solution for PS. Internal consistency reliability met psychometric standards (≥0.70) for all PS subscales. Construct validity was established for the PS subscales: Physician Communication, Treatment Staff Communication, Technical Competence, Confidence and Trust, and Nurse Communication. The two instruments generated here offer a new way to assess several key dimensions of patient satisfaction with treatment, especially for people with lung cancer.

  13. La grossesse chez l'adolescente à l'hôpital de Tsévié (Togo ...

    African Journals Online (AJOL)

    Objectif : Décrire le profil des grossesses chez l'adolescente à l'hôpital de Tsévié (Togo). Matériel et méthode : Il s'agissait d'une étude descriptive analytique portant sur les dossiers des parturientes âgées de 10 à 19 ans reçues à l'hôpital de Tsévié entre janvier 2011 et juin 2012. Résultats : Au cours de cette période, 180 ...

  14. Hypocellularity in the Murine Model for Down Syndrome Ts65Dn Is Not Affected by Adult Neurogenesis

    Science.gov (United States)

    López-Hidalgo, Rosa; Ballestín, Raul; Vega, Jessica; Blasco-Ibáñez, José M.; Crespo, Carlos; Gilabert-Juan, Javier; Nácher, Juan; Varea, Emilio

    2016-01-01

    Down syndrome (DS) is caused by the presence of an extra copy of the chromosome 21 and it is the most common aneuploidy producing intellectual disability. Neural mechanisms underlying this alteration may include defects in the formation of neuronal networks, information processing and brain plasticity. The murine model for DS, Ts65Dn, presents reduced adult neurogenesis. This reduction has been suggested to underlie the hypocellularity of the hippocampus as well as the deficit in olfactory learning in the Ts65Dn mice. Similar alterations have also been observed in individuals with DS. To determine whether the impairment in adult neurogenesis is, in fact, responsible for the hypocellularity in the hippocampus and physiology of the olfactory bulb, we have analyzed cell proliferation and neuronal maturation in the two major adult neurogenic niches in the Ts656Dn mice: the subgranular zone (SGZ) of the hippocampus and the subventricular zone (SVZ). Additionally, we carried out a study to determine the survival rate and phenotypic fate of newly generated cells in both regions, injecting 5′BrdU and sacrificing the mice 21 days later, and analyzing the number and phenotype of the remaining 5′BrdU-positive cells. We observed a reduction in the number of proliferating (Ki67 positive) cells and immature (doublecortin positive) neurons in the subgranular and SVZ of Ts65Dn mice, but we did not observe changes in the number of surviving cells or in their phenotype. These data correlated with a lower number of apoptotic cells (cleaved caspase 3 positive) in Ts65Dn. We conclude that although adult Ts65Dn mice have a lower number of proliferating cells, it is compensated by a lower level of cell death. This higher survival rate in Ts65Dn produces a final number of mature cells similar to controls. Therefore, the reduction of adult neurogenesis cannot be held responsible for the neuronal hypocellularity in the hippocampus or for the olfactory learning deficit of Ts65Dn mice

  15. A novel method of TVTS in the TS-3 device and the proposal of its application to a large device

    International Nuclear Information System (INIS)

    Tokimatsu, K.; Hayashi, N.; Ueda, Y.; Ono, Y.; Katsurai, M.

    1997-01-01

    A novel method of television Thomson scattering (TVTS) has been developed in the TS-3 device. In this system, a framing camera is located between a spectroscope and a close coupled device camera. This framing camera can take two successive frames from the exit of the spectroscope. The time interval is of 500 ns between those two frames. Because of the shortness of this time interval, the background light is negligible; moreover TVTS is applicable to the TS-3 device whose plasma lifetime is about 150 μs. This method indicates the possibility of not only high spatial resolution but also time repetition in a simple system. (orig.)

  16. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-01-04

    ... Bulk 74. Electric System 1. Inclusion I1 (Transformers) 75. Commission Determination 80. 2. Inclusion... configurations are included in the bulk electric system. Inclusions: I1--Transformers with the primary terminal... bulk electric system. 15. NERC explained that inclusion I1 includes transformers with the primary...

  17. Electric motor handbook

    CERN Document Server

    Chalmers, B J

    2013-01-01

    Electric Motor Handbook aims to give practical knowledge in a wide range of capacities such as plant design, equipment specification, commissioning, operation and maintenance. The book covers topics such as the modeling of steady-state motor performance; polyphase induction, synchronous, and a.c. commutator motors; ambient conditions, enclosures, cooling and loss dissipation; and electrical supply systems and motor drives. Also covered are topics such as variable-speed drives and motor control; materials and motor components; insulation types, systems, and techniques; and the installation, sit

  18. Commissioning of the CEBAF cryomodules

    International Nuclear Information System (INIS)

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  19. The state of cancer survivorship programming in Commission on Cancer-accredited hospitals in Georgia.

    Science.gov (United States)

    Kirsch, Logan J; Patterson, Angela; Lipscomb, Joseph

    2015-03-01

    In Georgia, there are more than 356,000 cancer survivors. Although many encounter challenges as a result of treatment, there is limited data on the availability of survivorship programming. This paper highlights findings from two surveys assessing survivorship care in Commission on Cancer (CoC)-accredited hospitals in Georgia. In 2010, 38 CoC-accredited hospitals were approached to complete a 36-item survey exploring knowledge of national standards and use of survivorship care plans (SCPs), treatment summaries (TSs), and psychosocial assessment tools. In 2012, 37 CoC-accredited hospitals were asked to complete a similar 21-item survey. Seventy-nine percent (n = 30) of cancer centers completed the 2010 survey. Sixty percent (n = 18) reported having a cancer survivorship program in place or in development. Forty-three percent (n = 13) provided survivors with a SCP and 40% (n = 12) a TS. Sixty percent (n = 18) reported either never or rarely using a psychosocial assessment tool. Sixty-two percent (n = 23) completed the 2012 survey. Ninety-six percent (n = 22) were aware of the new CoC guideline 3.3. Thirty-nine percent (n = 9) provided a SCP and/or TS. Eighty-seven percent (n = 20) stated they were very confident or somewhat confident their organization could implement a SCP and/or TS by 2015. The data indicated the importance of collaboration and shared responsibility for survivorship care. Broad implementation of SCPs and TSs can help address the late and long-term effects of treatment. Increasing knowledge on survivorship care is imperative as the Georgia oncology community engages oncologists and primary care providers to achieve higher quality of life for all survivors.

  20. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  1. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  2. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  3. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00025; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  4. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  5. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion...

  6. Temperature-sensitive mutants of influenza A virus. XIV. Production and evaluation of influenza A/Georgia/74-ts-1[E] recombinant viruses in human adults.

    Science.gov (United States)

    Richman, D D; Murphy, B R; Belshe, R B; Rusten, H M; Chanock, R M; Blacklow, N R; Parrino, T A; Rose, F B; Levine, M M; Caplan, E

    1977-08-01

    The two temperature-sensitive (ts) lesions present in influenza A/Hong Kong/68-ts-1[E] (H3N2 68) virus were transferred via genetic reassortment to influenza A/Georgia/74 (H3N2 74) wild-type virus. A recombinant clone possessing both ts lesions and the shutoff temperature of 38 C of the Hong Kong/68 ts donor and the two surface antigens of the Georgia/74 wild-type virus was administered to 32 seronegative adult volunteers. Thirty-one volunteers were infected, of whom only five experienced mild afebrile upper respiratory tract illness. The wild-type recipient virus was a cloned population that induced illness in five of six infected volunteers. Therfore, the attenuation exhibited by the Georgia/74-ts-1[E] virus could reasonably be assumed to be due to the acquisition of the two ts-1[E] lesions by the Georgia/74 wild-type virus. The serum and nasal wash antibody responses of the ts-1[E] vaccinees were equivalent to those of the volunteers who received wild-type virus. The two ts lesions present in the Hong Kong/68-ts-1[E] virus have now been transferred three times to a wild-type virus bearing a new hemagglutinin, and in each instance the new ts recombination exhibited a similar, satisfactory level of attenuation and antigenicity for adults. It seems likely that the transfer of the ts-1[E] lesions to any new influenza virus will regularly result in attenuation of a recombinat virus possessing the new surface antigens.

  7. SERPUKHOV: UNK transfer beamline commissioned

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  8. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  9. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  10. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  11. Division A Commission 31: Time

    Science.gov (United States)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  12. Nuclear Regulatory Commission issuances: Volume 39, Number 6

    International Nuclear Information System (INIS)

    1994-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). Issuances of the Nuclear Regulatory Commission include: (1) Advanced Medical Systems, Inc.; (2) Henry Allen, Diane Marrone, and Susan Settino; and (3) Westinghouse Electric Corporation. Issuances of the Atomic Safety and Licensing Boards include: (1) Sequoyah Fuels Corporation and General Atomics Corporation and (2) Umetco Minerals Corporation. Issuances of Director's Decisions include: (1) Advanced Medical Systems, Inc., and (2) Boston Edison Company and all boiling water reactors. The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  13. Coordination of the commissioning of the LHC technical systems

    CERN Document Server

    Saban, R; Casas Lino, M P; Fernandez Robles, C; Pojer, M; Schmidt, R; Solfaroli Camillocci, M; Vergara Fernandez, A

    2008-01-01

    The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and 400 superconducting quadrupoles with a strength of 220 T/m powered at 12kA, operating in superfluid He at 1.9K. For dipoles and quadrupoles as well as for many other magnets more than 1700 power converters are necessary to feed the superconducting circuits. A sophisticated magnet protection system is crucial to detect a quench and safely extract the energy stored in the circuits (about 1GJ only in one of the dipole circuits) after a resistive transition. Besides, in such complex architecture, many technical services (e.g. cooling and ventilation, technical network, electrical distribution, GSM network, controls system, etc.) have to be reliably available during commissioning. Consequently, the commissioning of the technical systems and the associated infrastructures has been carefully studied. Procedures, automatic control and analysis tools, repositories for test data, management structures for carrying out a...

  14. Report made on behalf of the commission of economic affairs, environment and territory about the proposal of law, adopted in second lecture with modifications by the Senate, relative to the electricity and natural gas regulated tariffs; Rapport fait au nom de la Commission des Affaires Economiques, de l'Environnement et du Territoire sur la proposition de loi, adoptee avec modifications par le Senat en deuxieme lecture, relative aux tarifs reglementes d'electricite et de gaz naturel (n.565)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-01-15

    This text is the conclusion of a long parliamentary procedure with several debates about electricity and natural gas prices, for both individual users and companies. The first article of the proposal of law relative to regulated electricity and gas tariffs, is the only one that remains to be discussed, and concerns the households and the companies with a low power consumption. Examined first at the Senate on October 1, 2007, this proposal of law was debated at the House of Commons on December 11, 2007 and modified for one important point: the possibility for households who have made the choice of a de-regulated energy supplier to change back and benefit again of the regulated tariffs. The adoption of this amendment has led to make some adjustments in the proposal of law which are presented in this document. (J.S.)

  15. A novel concurrent chemoradiotherapy with TS-1/nedaplatin for esophageal cancer showing better quality of life durning treatment

    International Nuclear Information System (INIS)

    Miyazaki, Aya; Inaba, Hiroyuki; Tsuda, Takashi; Itoh, Fumio

    2005-01-01

    Concurrent chemoradiotherapy (CRT) for esophageal cancer is expected to achieve adequate quality of life (QOL) and to improve the survival of patients. As a QOL-oriented therapy for esophageal cancer, concurrent CRT with tegafur·gimestat·otastat potassium (TS-1)/nedaplatin (CDGP) was developed and evaluated. Between June 2001 and September 2002, 18 patients with esophageal cancer were enrolled in a clinical study of concurrent CRT with TS-1/CDGP. To evaluate the impact of treatment on the QOL, the patients were asked to answer QOL Questionnaire for Cancer Patients Treated with Anticancer Drugs (QOL-ACD) before and after therapy. The response rate was 66.7%, with a complete response occurring in 9 (50.0%) of the 18 patients. Patients with improved global, functional, or mental QOL after therapy showed or tended to show a significant, longer survival. Compared to patients previously treated by the same regimen with 5-fluorouracil (5-FU) instead of TS-1, those receiving the present therapy were able to leave hospital more frequently during treatment. TS-1/CDGP-based CRT for esophageal cancer exhibited comparable antitumor activity and survival benefit as with standard 5-FU/cisplatin (CDDP)-based CRT without causing serious side-effects. The patients receiving the present therapy seemed to have a better chance of maintaining their QOL. (author)

  16. Influence of iron and beryllium additions on heat resistance of silicide coatings on TsMB-30 molybdenum alloy

    International Nuclear Information System (INIS)

    Zajtseva, A.L.; Fedorchuk, N.M.; Lazarev, Eh.M.; Korotkov, N.A.

    1985-01-01

    Alloying of titanium modified silicide coatings on TsMB-30 molybdenum alloy with iron or beryllium is stated to improve their protective properties. Coatings with low content of alloying elements have the best protective properties. Service life of coatings is determined by the formed oxide film and phase transformations taking place in the coating

  17. A Universal Ts-VI Triangle Method for the Continuous Retrieval of Evaporative Fraction From MODIS Products

    Science.gov (United States)

    Zhu, Wenbin; Jia, Shaofeng; Lv, Aifeng

    2017-10-01

    The triangle method based on the spatial relationship between remotely sensed land surface temperature (Ts) and vegetation index (VI) has been widely used for the estimates of evaporative fraction (EF). In the present study, a universal triangle method was proposed by transforming the Ts-VI feature space from a regional scale to a pixel scale. The retrieval of EF is only related to the boundary conditions at pixel scale, regardless of the Ts-VI configuration over the spatial domain. The boundary conditions of each pixel are composed of the theoretical dry edge determined by the surface energy balance principle and the wet edge determined by the average air temperature of open water. The universal triangle method was validated using the EF observations collected by the Energy Balance Bowen Ratio systems in the Southern Great Plains of the United States of America (USA). Two parameterization schemes of EF were used to demonstrate their applicability with Terra Moderate Resolution Imaging Spectroradiometer (MODIS) products over the whole year 2004. The results of this study show that the accuracy produced by both of these two parameterization schemes is comparable to that produced by the traditional triangle method, although the universal triangle method seems specifically suited to the parameterization scheme proposed in our previous research. The independence of the universal triangle method from the Ts-VI feature space makes it possible to conduct a continuous monitoring of evapotranspiration and soil moisture. That is just the ability the traditional triangle method does not possess.

  18. The impact of ISO/TS 16949 on automotive industries and created organizational capabilities from its implementation

    Directory of Open Access Journals (Sweden)

    Bakhtiar Ostadi

    2010-12-01

    Full Text Available ISO/TS 16949 is an ISO Technical Specification. ISO/TS 16949 achieves the objectives which are continually to improve the production of automobile parts and related services, and to strengthen the international competition for the automotive industry and its suppliers. By applying this quality system standard, automotive manufacturers could offer superior products and good services to customers. The more the companies know about the benefits if quality management systems such as ISO/TS 16949, better they can seek interest and determine indices of these systems. So, this standard has been implemented in companies considering a number of benefits. In this paper, we carry out an empirical study in order to verify the importance these benefits and ranking them based on the value of importance. Finally, the study tends to provide a reference guide considering benefits assessment and created organizational capabilities from this standard for the automotive industry in pursuing ISO/TS 16949 and procuring maximum benefit from the results.

  19. VISIT-TS: A multimedia tool for population studies on tic disorders [version 2; referees: 2 approved

    Directory of Open Access Journals (Sweden)

    M. Jonathan Vachon

    2016-10-01

    Full Text Available Population-based assessment of Tourette syndrome (TS and other tic disorders produces a paradox. On one hand, ideally diagnosis of tic disorders requires expert observation. In fact, diagnostic criteria for TS explicitly require expert assessment of tics for a definite diagnosis. On the other hand, large-scale population surveys with expert assessment of every subject are impracticable. True, several published studies have successfully used expert assessment to find tic prevalence in a representative population (e.g. all students in a school district. However, extending these studies to larger populations is daunting. We created a multimedia tool to demonstrate tics to a lay audience, discuss their defining and common attributes, and address features that differentiate tics from other movements and vocalizations. A first version was modified to improve clarity and to include a more diverse group in terms of age and ethnicity. The result is a tool intended for epidemiological research. It may also provide additional benefits, such as more representative minority recruitment for other TS studies and increased community awareness of TS.

  20. NeemAzal T/S – toxicity to early-life stages of common carp (Cyprinus carpio L.)

    Czech Academy of Sciences Publication Activity Database

    Chromcová, L.; Blahová, J.; Živná, D.; Plhalová, L.; Casuscelli di Tocco, F.; Divišová, L.; Prokeš, Miroslav; Faggio, C.; Tichý, F.; Svobodová, Z.

    2015-01-01

    Roč. 60, č. 1 (2015), s. 23-30 ISSN 0375-8427 Institutional support: RVO:68081766 Keywords : Neemazal T/S * embryo-larval toxicity test * azadirachtin * oxidative stress * histopathology * insecticide Subject RIV: GJ - Animal Vermins ; Diseases, Veterinary Medicine Impact factor: 0.560, year: 2015

  1. Benefits and Factors Influencing the Design of Intergenerational Digital Games: A Systematic Literature Review

    NARCIS (Netherlands)

    de la Hera Conde-Pumpido, T.; Loos, E.F.; Simons, M.; Blom, J.

    2017-01-01

    The main purpose of this paper is to review the benefits and factors to be taken into consideration for the design of intergenerational digital games. We conducted a systematic in Scopus, Web of Science, PsicInfo, Pubmed and Science Direct, finally including 16 empirical studies written in English.

  2. A highly Conserved Aspartic Acid Residue of the Chitosanase from Bacillus Sp. TS Is Involved in the Substrate Binding.

    Science.gov (United States)

    Zhou, Zhanping; Zhao, Shuangzhi; Liu, Yang; Chang, Zhengying; Ma, Yanhe; Li, Jian; Song, Jiangning

    2016-11-01

    The chitosanase from Bacillus sp. TS (CsnTS) is an enzyme belonging to the glycoside hydrolase family 8. The sequence of CsnTS shares 98 % identity with the chitosanase from Bacillus sp. K17. Crystallography analysis and site-direct mutagenesis of the chitosanase from Bacillus sp. K17 identified the important residues involved in the catalytic interaction and substrate binding. However, despite progress in understanding the catalytic mechanism of the chitosanase from the family GH8, the functional roles of some residues that are highly conserved throughout this family have not been fully elucidated. This study focused on one of these residues, i.e., the aspartic acid residue at position 318. We found that apart from asparagine, mutation of Asp318 resulted in significant loss of enzyme activity. In-depth investigations showed that mutation of this residue not only impaired enzymatic activity but also affected substrate binding. Taken together, our results showed that Asp318 plays an important role in CsnTS activity.

  3. Notification of the commission on the eco-toxicity of chemical substances; Avis de la commission d'evaluation de l'ecotoxicite des substances chimiques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The french commission on the evaluation of the chemical substances eco-toxicity, published recommendations concerning the use of additives for the automotive fuels, for the cooling circuit of electric power plants and for gases against fire. The risks for the public health are analysed and safety precautions are asked. (A.L.B.)

  4. The new special report of the Monopolies Commission on the energy markets

    International Nuclear Information System (INIS)

    Zenke, Ines; Heymann, Tigran; Poppe, Sebastian

    2015-01-01

    The Monopolies Commission has published once more a special report on the energy market, which is now 71. In this they examined regularly for many years as well the competition in the German electricity and gas markets work and how he is developping foreseeable. Especially the five-member Commission comments current changes of the regulatory framework and gives the legislature from competitive economic perspective suggestions for possible need for adaptation. In the current special report itself the Monopolies Commission therefore also daels with the current plans of the Federal Government for an electricity market law apart, outlined in the Green and White Papers of the Federal Government to the electricity market 2.0. This contribution begins with an overview of the investigation by the Monopolies Commission on the situation of competition in the German energy markets since the last special report (Point A). Proceeding from this point is the analysis of Monopolies Commission with the projects of the electricity market law ist taken up and assessed (point B). Closing the authors draw a conclusion (point C). [de

  5. THE DOUBLE-DEGENERATE NUCLEUS OF THE PLANETARY NEBULA TS 01: A CLOSE BINARY EVOLUTION SHOWCASE

    International Nuclear Information System (INIS)

    Tovmassian, Gagik; Richer, Michael G.; Yungelson, Lev; Rauch, Thomas; Suleimanov, Valery; Napiwotzki, Ralf; Stasinska, Grazyna; Tomsick, John; Wilms, Joern; Morisset, Christophe; Pena, Miriam

    2010-01-01

    We present a detailed investigation of SBS 1150+599A, a close binary star hosted by the planetary nebula PN G135.9+55.9 (TS 01). The nebula, located in the Galactic halo, is the most oxygen-poor known to date and is the only one known to harbor a double degenerate core. We present XMM-Newton observations of this object, which allowed the detection of the previously invisible component of the binary core, whose existence was inferred so far only from radial velocity (RV) and photometric variations. The parameters of the binary system were deduced from a wealth of information via three independent routes using the spectral energy distribution (from the infrared to X-rays), the light and RV curves, and a detailed model atmosphere fitting of the stellar absorption features of the optical/UV component. We find that the cool component must have a mass of 0.54 ± 0.2 M sun , an average effective temperature, T eff , of 58,000 ± 3000 K, a mean radius of 0.43 ± 0.3 R sun , a gravity, log g = 5.0 ± 0.3, and that it nearly fills its Roche lobe. Its surface elemental abundances are found to be: 12 + log He/H = 10.95 ± 0.04 dex, 12 + log C/H = 7.20 ± 0.3 dex, 12 + log N/H eff = 160-180 kK, a luminosity of about ∼10 4 L sun and a radius slightly larger than that of a white dwarf. It is probably bloated and heated as a result of intense accretion and nuclear burning on its surface in the past. The total mass of the binary system is very close to the Chandrasekhar limit. This makes TS 01 one of the best Type Ia supernova progenitor candidates. We propose two possible scenarios for the evolution of the system up to its present stage.

  6. Israel Atomic Energy Commission 1997 Annual Report

    International Nuclear Information System (INIS)

    1997-01-01

    radioisotope diagnostics and therapy by individually calibrated, rapidly dissolving capsules, resulted in better dose control and reduced patient and personnel exposures. The non-nuclear aspect of our work is represented this year by the fourth paper, which deals with the utilization of our plasma physics expertise in the development and parametric studies of advanced Hall thrusters for space applications. An interesting outcome of this work was the disco Query of the dependence of the electrical characteristics and performance of the thruster on the material its chamber is made of. Finally, I would like to commend once again the authors of the selected presentations as well as the entire staff of the Israel Atomic Energy Commission for their continued efforts, contributions and achievements and to wish them all many more years of fruitful endeavors

  7. Israel Atomic Energy Commission 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    radioisotope diagnostics and therapy by individually calibrated, rapidly dissolving capsules, resulted in better dose control and reduced patient and personnel exposures. The non-nuclear aspect of our work is represented this year by the fourth paper, which deals with the utilization of our plasma physics expertise in the development and parametric studies of advanced Hall thrusters for space applications. An interesting outcome of this work was the disco Query of the dependence of the electrical characteristics and performance of the thruster on the material its chamber is made of. Finally, I would like to commend once again the authors of the selected presentations as well as the entire staff of the Israel Atomic Energy Commission for their continued efforts, contributions and achievements and to wish them all many more years of fruitful endeavors.

  8. A non-chemically selective top-down approach towards the preparation of hierarchical TS-1 zeolites with improved oxidative desulfurization catalytic performance.

    Science.gov (United States)

    Du, Shuting; Chen, Xiaoxin; Sun, Qiming; Wang, Ning; Jia, Mingjun; Valtchev, Valentin; Yu, Jihong

    2016-02-28

    Hierarchical TS-1 zeolites with secondary macropores have been successfully prepared by using two different fluoride-containing chemical etching post-treated routes. Hierarchical TS-1 zeolites exhibited a chemical composition similar to that of the parent material and showed remarkably enhanced catalytic activity in oxidative desulfurization reaction.

  9. Elongation factor Ts directly facilitates the formation and disassembly of the Escherichia coli elongation factor Tu·GTP·aminoacyl-tRNA ternary complex.

    Science.gov (United States)

    Burnett, Benjamin J; Altman, Roger B; Ferrao, Ryan; Alejo, Jose L; Kaur, Navdep; Kanji, Joshua; Blanchard, Scott C

    2013-05-10

    Aminoacyl-tRNA (aa-tRNA) enters the ribosome in a ternary complex with the G-protein elongation factor Tu (EF-Tu) and GTP. EF-Tu·GTP·aa-tRNA ternary complex formation and decay rates are accelerated in the presence of the nucleotide exchange factor elongation factor Ts (EF-Ts). EF-Ts directly facilitates the formation and disassociation of ternary complex. This system demonstrates a novel function of EF-Ts. Aminoacyl-tRNA enters the translating ribosome in a ternary complex with elongation factor Tu (EF-Tu) and GTP. Here, we describe bulk steady state and pre-steady state fluorescence methods that enabled us to quantitatively explore the kinetic features of Escherichia coli ternary complex formation and decay. The data obtained suggest that both processes are controlled by a nucleotide-dependent, rate-determining conformational change in EF-Tu. Unexpectedly, we found that this conformational change is accelerated by elongation factor Ts (EF-Ts), the guanosine nucleotide exchange factor for EF-Tu. Notably, EF-Ts attenuates the affinity of EF-Tu for GTP and destabilizes ternary complex in the presence of non-hydrolyzable GTP analogs. These results suggest that EF-Ts serves an unanticipated role in the cell of actively regulating the abundance and stability of ternary complex in a manner that contributes to rapid and faithful protein synthesis.

  10. Decision from the Commission of Electricity Regulation (CRE) dated from May 2, 2002 about a dispute between the manager of the power transportation network (RTE) and the autonomous administration of Parisian transports (RATP) relative to the conditions of consideration of the multiplicity of power supply points in the contractual system of access to the power grid; Decision de la Commission de Regulation de l'Electricite (CRE) en date du 2 mai 2002 sur un different qui oppose le gestionnaire du Reseau de Transport d'Electricite (RTE) et la Regie Autonome des Transports Parisiens (RATP) relatif aux conditions de prise en compte de la multiplicite des points de livraison dans le dispositif contractuel d'acces au reseau electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    This document is the analysis made by the French commission of electricity regulation (CRE) about a dispute between the French manager of the power transportation grid (RTE) and the autonomous administration of Parisian transports (RATP) about its contract of access to the grid for the power supply of the underground railway of Paris. The RATP requested a regrouping of all its 7 supply points in a single contract. After analysis of the hearings, the CRE considers that no discrimination exists in the contractual system proposed by the RTE and thus the RATP request has been rejected. (J.S.)

  11. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  12. Current status of and problems in ice heat storage systems contributing to improving load rate. Proliferation and expanded use are intended by using the heat storage commission system and development of low-cost heat storage tanks (Kansai Electric Power Co. Inc.); Fukaritsu kaizen ni kokensuru kori chikunetsu system no genjo to kadai. Chikunetsu jutaku seido ya teikakaku chikunetsuso kaihatsu de fukyu kakudai mezasu (Kansai Denryoku)

    Energy Technology Data Exchange (ETDEWEB)

    Fujise, M. [Kansai Electric Power Co. Inc., Osaka (Japan)

    1998-02-01

    This paper introduces activities performed by Kansai Electric Power Co., Inc. on ice heat storage systems. In the work on ice heat storage proliferation activities, systems for preferential treatment on power charge and a bounty for the system proliferation are available. Utilizing the ice heat storage system allows customers to use low-priced nighttime power as defined in an ice heat adjustment contract. Since this system reduces the power requirement under the contract, the running cost becomes less expensive. Furthermore, power charge discount system has been applied since fiscal 1997 according to a `heat storage peak adjustment contract`. In addition, in order to reduce the initial cost for an ice heat storage device, a system has been established, in which electric power companies pay bounty to device manufacturers for sales for proliferation. Under this system, if two ice heat storage units corresponding to 110 freezing tons are installed in an office building with an area of 10,000 m {sup 2}, a cost reduction of about 2.3 million yen is possible. For the purpose of reducing burden of initial investment on customers, a `lease system` and a `heat storage commission system` have been established to install and maintain air conditioners. 6 figs., 1 tab.

  13. Experiments in a boundary layer subjected to free stream turbulence. Part 2: The role of TS waves in the transition process

    International Nuclear Information System (INIS)

    Boiko, A.V.; Westin, K.J.A.; Klingmann, B.G.B.; Kozlov, V.V.; Alfredsson, P.H.

    1993-12-01

    The natural occurrence of Tollmien-Schlichting (TS) waves has so far only been observed in boundary layers subjected to moderate levels of free stream turbulence (Tu <1%), due to the difficulty in detecting small-amplitude waves in highly perturbed boundary layers. By introducing controlled oscillations with a vibrating ribbon, it is possible to study small amplitude waves using phase-selective filtering techniques. In the present work, the effect of TS-waves on the transition is studied at Tu = 1.5%. It is demonstrated that TS-waves can exist and develop in a similar way as in an undisturbed boundary layer. It is also found that TS-waves with quite small amplitudes are involved in nonlinear interactions which lead to a regeneration of TS-waves in the whole unstable frequency band. This results in a significant increase in the number of turbulent spots, which promote the onset of turbulence. 28 refs

  14. MIRAS characterization and monitoring during the SMOS In-Orbit Commissioning Phase

    Science.gov (United States)

    Corbella, I.; Torres, F.; Martin-Neira, M.; Duffo, N.; González-Gambau, V.; Camps, A.; Vall-Llossera, M.

    2009-04-01

    1 Introduction The Microwave Imaging Radiometer with Aperture Synthesis (MIRAS) is the single payload of the Soil Moisture and Ocean Salinity (SMOS) mission. The instrument was completed in early 2007 and thoroughly tested both in anechoic chamber and vacuum thermal chamber during 2007. It was integrated to the platform in early 2008 and re-tested, including compatibility, during 2008. At present, the whole satellite is stowed and waiting to be launched during 2009. In two weeks after launch, the satellite will be in the final orbit with all deployments completed. Then the In-Orbit Commissioning Phase will start, having an estimated duration of 5.5 months. During this phase, the instrument modes of operation will be systematically checked and the calibration parameters will be fully characterized in real conditions. Also, the first brightness temperature images will be obtained in order to assess the overall retrieval procedures including inversion. In the end, the objective of the In-Orbit Commissioning Phase is to provide verification that the payload meets the scientific requirements of the mission. The general design and planning of the In-Orbit Commissioning Phase is given in [1]. This abstract presents the foreseen activities to be performed during this phase by the UPC team. Just after the start of the In-Orbit Commissioning Phase, the instrument will be commanded to perform a sequence of operations oriented at providing a full characterization in terms of calibration parameters. The idea is to reproduce the results obtained during the tests carried out on ground [2]. In particular, the following issues will be covered: Thermal Stability: To provide understanding of both the intra-orbit and inter-orbit temperature variations. The instrument will be continuously operating during a number of orbits while all temperature sensors being monitored. Electrical Stability: To re-compute all internal calibration parameters (gains, offsets, receiver noise temperatures

  15. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  16. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  17. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  18. Nuclear Regulatory Commission issuances. Volume 44, Number 2

    International Nuclear Information System (INIS)

    1996-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). The topics of this publication include the dismissal of a suit brought against Georgia Power Company in the transfer of Vogtle Electric Generating Plant, units 1 and 2 to Southern Nuclear; and denial of a petition to review the entire licensing process for Watts Bar Nuclear Plant, Unit 1 operated by the Tennessee Valley Authority

  19. Development and commissioning of a links type inspection manipulator

    International Nuclear Information System (INIS)

    Whitcomb, H.M.; Ford, G.T.

    1988-01-01

    In order to access a number of tortuous inspection routes in the Heysham II/Torness reactors, the Central Electricity Generating Board (CEGB) Remote Inspection Group (RIG) have developed a 'links' type manipulator in conjunction with Babcock Power Ltd. This manipulator operates from the reactor pile cap and allows placement of a television camera within the pressure vessel up to 4m laterally from a standpipe of only 140mm in diameter. The design features of this novel manipulator are described together with the solutions developed to overcome particular difficulties experienced during commissioning. (author)

  20. The ATLAS SCT: Commissioning Experience and SLHC Upgrade

    OpenAIRE

    Mitrevski, J

    2008-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, ...

  1. Commissioning of the cryogenics of the LHC long straight sections

    International Nuclear Information System (INIS)

    Perin, A.; Casas-Cubillos, J.; Claudet, S.; Darve, C.; Ferlin, G.; Millet, F.; Parente, C.; Rabehl, R.; Soubiran, M.; van Weelderen, R.; Wagner, U.

    2010-01-01

    The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most powering interfaces to the LHC are located in these sections where the particle beams are focused and shaped for collision, cleaning and acceleration. The LSSs are constituted of several unique cryogenic devices and systems like electrical feed-boxes, standalone superconducting magnets, superconducting links, RF cavities and final focusing superconducting magnets. This paper presents the cryogenic commissioning and the main results obtained during the first operation of the LHC Long Straight Sections.

  2. Background submission to the Royal Commission on Nuclear Power Generation

    International Nuclear Information System (INIS)

    1976-12-01

    The Royal Commission on Nuclear Power Generation in New Zealand is required to inquire into and report upon the likely consequences of a nuclear power programme. The New Zealand Electricity Department would have prime responsibilty for implementing the construction, operation and maintenance of nuclear power plants should the need be established and should this be acceptable to the Government. In this submission the Department has attempted to present the issues raised by the introduction of nuclear power in relatively simple terms on the assumption that elaboration can be provided later if necessary

  3. Commissioning of the Cryogenics of the LHC Long Straight Sections

    CERN Document Server

    Perin, A; Claudet, S; Darve, C; Ferlin, G; Millet, F; Parente, C; Rabehl, R; Soubiran, M; van Weelderen, R; Wagner, U

    2010-01-01

    The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most powering interfaces to the LHC are located in these sections where the particle beams are focused and shaped for collision, cleaning and acceleration. The LSSs are constituted of several unique cryogenic devices and systems like electrical feed-boxes, standalone superconducting magnets, superconducting links, RF cavities and final focusing superconducting magnets. This paper presents the cryogenic commissioning and the main results obtained during the first operation of the LHC Long Straight Sections.

  4. Pressure gradient effect at distributed excitation of 3D TS waves by freestream and wall disturbances

    Directory of Open Access Journals (Sweden)

    Borodulin Vladimir

    2017-01-01

    Full Text Available The present work is a continuation of previous experiments (carried out in the Blasius boundary layer and devoted to quantitative investigation of influence of an adverse pressure gradient on two efficient mechanisms of excitation of 3D TS instability waves due to a distributed boundary layer receptivity to free-stream vortices. These mechanisms are associated with distributed scattering of 3D amplified free-stream vortices both on the natural boundary-layer nonuniformity (on smooth surface and on 2D surface nonuniformities (waviness. The corresponding detailed hotwire measurements were carried out in a self-similar boundary layer with Hartree parameter βH = –0.115 in a wide range of the problem parameters. Complex values of quantitative characteristics of the physical phenomenon under study (the distributed receptivity coefficients are evaluated by based on the obtained experimental data. It is found that the adverse pressure gradient leads to reduction of efficiency of the investigated vortexroughness receptivity mechanism.

  5. The use of chloroaluminium phthalocyanine tetrasulfonate (AlPcTS) for time-delayed fluorescence imaging

    International Nuclear Information System (INIS)

    Gundy, Sarah; Putten, Wil van der; Shearer, Andy; Buckton, Daniel; Ryder, Alan G; Ball, Michael

    2004-01-01

    Phthalocyanine derivatives are currently under investigation for use in photodynamic therapy, which is a promising cancer treatment. These materials, which display preferential uptake in cancerous cells, also exhibit high fluorescence yields and can be used for tumour detection. Problems with steady-state fluorescence techniques such as excitation scatter and background autofluorescence can be eliminated by using time-resolved imaging techniques without the need for filters. A tissue phantom was assembled to test a constructed time-gated imaging system by drilling 36 wells of varying diameter and depth (10 mm to 1 mm) into a block of polymethyl methacrylate (PMMA). The system was used to record images of chloroaluminium phthalocyanine tetrasulfonate (AlPcTS) at differing concentrations in neat aqueous solvent and cell suspensions within the wells. A mixture of Intralipid (to mimic tissue scatter) and Evan's blue (to mimic tissue absorption) of depths ranging from 1 mm to 10 mm was placed on top of the PMMA block. The ensuing images were analysed using signal-to-noise ratios and contrast-detail curves. The results indicate that the time-gated imaging system can prevent background excitation scatter from distorting the fluorescence signal from a longer-lived photosensitizer without the need for filters

  6. Transient and intermittent magnetic reconnections in TS-3/UTST merging startup experiments

    International Nuclear Information System (INIS)

    Ono, Y.; Imazawa, R.; Imanaka, H.; Hayamizu, T.; Inomoto, M.; Sato, M.; Kawamori, E.; Ejiri, A.; Takase, Y.; Asai, T.; Takahashi, T.

    2007-01-01

    The high-power reconnection heating has been developed in the TS-3 merging experiments, leading us to a new pulsed high-beta spherical tokamak (ST) formation. Two ST plasmas were produced inductively by two or four PF coils without using any central solenoid (CS) coil and were merged together for MW-GW reconnection heating. The magnetic reconnection transformed the magnetic energy of reconnecting magnetic field through the outflow kinetic energy finally to the ion thermal energy, increasing the plasma beta of ST up to 0.5. A new finding is that ejection of current sheet (or plasmoid) causes high-speed merging/ reconnection as well as high-power heating. In the high-q ST merging, the sheet resistivity was almost classical due to the sheet thickness much longer than ion gyroradius. Large inflow flux and low current-sheet dissipation resulted in flux pileup followed by rapid growth of the current sheet. When the flux pileup exceeded a critical limit, the sheet was ejected mechanically from the squeezed X-point area. The reconnection (outflow) speed was slow during the flux pileup and was fast during the ejection, indicating that intermittent reconnection similar to the solar flare increased the averaged reconnection speed. These transient effects enable us to have the fast reconnection as well as the high-power reconnection heating, even if the merging high-q tokamaks have low current-sheet resistivity. (author)

  7. Adenylylation of small RNA sequencing adapters using the TS2126 RNA ligase I.

    Science.gov (United States)

    Lama, Lodoe; Ryan, Kevin

    2016-01-01

    Many high-throughput small RNA next-generation sequencing protocols use 5' preadenylylated DNA oligonucleotide adapters during cDNA library preparation. Preadenylylation of the DNA adapter's 5' end frees from ATP-dependence the ligation of the adapter to RNA collections, thereby avoiding ATP-dependent side reactions. However, preadenylylation of the DNA adapters can be costly and difficult. The currently available method for chemical adenylylation of DNA adapters is inefficient and uses techniques not typically practiced in laboratories profiling cellular RNA expression. An alternative enzymatic method using a commercial RNA ligase was recently introduced, but this enzyme works best as a stoichiometric adenylylating reagent rather than a catalyst and can therefore prove costly when several variant adapters are needed or during scale-up or high-throughput adenylylation procedures. Here, we describe a simple, scalable, and highly efficient method for the 5' adenylylation of DNA oligonucleotides using the thermostable RNA ligase 1 from bacteriophage TS2126. Adapters with 3' blocking groups are adenylylated at >95% yield at catalytic enzyme-to-adapter ratios and need not be gel purified before ligation to RNA acceptors. Experimental conditions are also reported that enable DNA adapters with free 3' ends to be 5' adenylylated at >90% efficiency. © 2015 Lama and Ryan; Published by Cold Spring Harbor Laboratory Press for the RNA Society.

  8. The Epoxidation of Limonene over the TS-1 and Ti-SBA-15 Catalysts

    Directory of Open Access Journals (Sweden)

    Agnieszka Wróblewska

    2014-11-01

    Full Text Available Limonene belongs to a group of very important intermediates used in the production of fine chemicals. This monoterpene compound can be obtained from peels of oranges or lemon which are a (biomass waste from the orange juice industry. Thus, limonene is a renewable, easy available and a relatively cheap compound. This work presents preliminary studies on the process of limonene epoxidation over zeolite type catalysts such as: TS-1 and Ti-SBA-15. In these studies methanol was used as a solvent and as an oxidizing agent a 60 wt % hydrogen peroxide solution was applied. The activity of each catalyst was investigated for four chosen temperatures (0 °C, 40 °C, 80 °C and 120 °C. The reaction time was changed from 0.5 to 24 h. For each catalyst the most beneficial conditions (the appropriate temperature and the reaction time have been established. The obtained results were compared and the most active catalyst was chosen. These studies have also shown different possible ways of limonene transformation, not only in the direction of 1,2-epoxylimonene and its corresponding diol, but also in direction of carveol, carvone and perillyl alcohol—compounds with a lot of applications. The possible mechanisms of formation of the allylic oxidation products were proposed.

  9. Trapping or tethering stones (TS: A multifunctional device in the Pastoral Neolithic of the Sahara.

    Directory of Open Access Journals (Sweden)

    Marina Gallinaro

    Full Text Available The Pierres de Ben Barour, also known as trapping or tethering stones (TS, are stone artefacts with notches or grooves usually interpreted as hunting devices on the basis of rock art engravings. Though their presence is a peculiar feature of desert landscapes from the Sahara to the Arabian Peninsula, we know little about their age, context and function. Here we present a new approach to the study of these artefacts based on a large dataset (837 items recorded in the Messak plateau (SW Libya. A statistically-based geoarchaeological survey carried out between 2007 and 2011 in Libya, alongside landscape and intra-site analyses of specific archaeological features (such as rock art, settlement and ceremonial contexts, reveal that these artefacts were used for a prolonged period, probably from the early Holocene. This was followed by a multifunctional use of these devices, particularly during the Pastoral Neolithic phase (ca. 6400-3000 cal BC, with the highest concentrations being found near ceremonial contexts related to cattle burials.

  10. Light-cone reduction vs. TsT transformations: a fluid dynamics perspective

    Science.gov (United States)

    Dutta, Suvankar; Krishna, Hare

    2018-05-01

    We compute constitutive relations for a charged (2+1) dimensional Schrödinger fluid up to first order in derivative expansion, using holographic techniques. Starting with a locally boosted, asymptotically AdS, 4 + 1 dimensional charged black brane geometry, we uplift that to ten dimensions and perform TsT transformations to obtain an effective five dimensional local black brane solution with asymptotically Schrödinger isometries. By suitably implementing the holographic techniques, we compute the constitutive relations for the effective fluid living on the boundary of this space-time and extract first order transport coefficients from these relations. Schrödinger fluid can also be obtained by reducing a charged relativistic conformal fluid over light-cone. It turns out that both the approaches result the same system at the end. Fluid obtained by light-cone reduction satisfies a restricted class of thermodynamics. Here, we see that the charged fluid obtained holographically also belongs to the same restricted class.

  11. MIS High-Purity Plutonium Oxide Metal Oxidation Product TS707001 (SSR123): Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Veirs, Douglas Kirk [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stroud, Mary Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Berg, John M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Narlesky, Joshua Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Worl, Laura Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Martinez, Max A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Carillo, Alex [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-09

    A high-purity plutonium dioxide material from the Material Identification and Surveillance (MIS) Program inventory has been studied with regard to gas generation and corrosion in a storage environment. Sample TS707001 represents process plutonium oxides from several metal oxidation operations as well as impure and scrap plutonium from Hanford that are currently stored in 3013 containers. After calcination to 950°C, the material contained 86.98% plutonium with no major impurities. This study followed over time, the gas pressure of a sample with nominally 0.5 wt% water in a sealed container with an internal volume scaled to 1/500th of the volume of a 3013 container. Gas compositions were measured periodically over a six year period. The maximum observed gas pressure was 138 kPa. The increase over the initial pressure of 80 kPa was primarily due to generation of nitrogen and carbon dioxide gas in the first six months. Hydrogen and oxygen were minor components of the headspace gas. At the completion of the study, the internal components of the sealed container showed signs of corrosion, including pitting.

  12. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  13. Th european market of the electric power

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the CRE (commission of the Electric power Control) progress report concerning the first july 2000 to the 30 june 2001. Three main subjects are discussed, illustrated by economic data and graphs: the electric power european market, the french market control and the CRE. A special interest is given to the deregulation of the market and its consequences. (A.L.B.)

  14. Real Estate Agent Commission Disputes

    Directory of Open Access Journals (Sweden)

    Anida Duarte

    2015-06-01

    Full Text Available The purpose of this study was to examine the relationship among Procuring Cause Law, real estate agent years of experience, and real estate commission disputes. A pilot survey was conducted in the southwestern United States among real estate agents, realtor(s, and brokers. After testing the hypothesis, the decision was made to fail to reject the hypothesis and conclude that real estate agent experience and not Procuring Cause Law produced favorable outcomes in disputes. As a result, the following recommendations were made: (a Agency seller and buyer’s agreements should be used in each transaction to avoid disputes, (b proper expectations and guidelines should be reviewed prior to starting any real estate transaction, (c a checklist may assist in the assurance that all valuable information is reviewed, (d agents could benefit from fully understanding Procuring Cause Law and sharing this information with their clients, (e state and national regulatory requirements of the law could be modified for easier understanding and use, and (f consumers who willfully violate the law could be subject to monetary penalties.

  15. Overall Optimization for Offshore Wind Farm Electrical System

    DEFF Research Database (Denmark)

    Hou, Peng; Hu, Weihao; Chen, Cong

    2017-01-01

    Based on particle swarm optimization (PSO), an optimization platform for offshore wind farm electrical system (OWFES) is proposed in this paper, where the main components of an offshore wind farm and key technical constraints are considered as input parameters. The offshore wind farm electrical...... system is optimized in accordance with initial investment by considering three aspects: the number and siting of offshore substations (OS), the cable connection layout of both collection system (CS) and transmission system (TS) as well as the selection of electrical components in terms of voltage level...... that save 3.01% total cost compared with the industrial layout, and can be a useful tool for OWFES design and evaluation....

  16. TRAC development at General Electric

    International Nuclear Information System (INIS)

    Andersen, J.G.M.; Shaug, J.C.; Shiralkar, B.S.

    1987-01-01

    TRAC is a computer code for transient analysis of light water reactors. The BWR version of TRAC has been developed as a result of a close cooperation between General Electric Company and Idaho National Engineering Laboratory. Up through 1985 the development work at General Electric was jointly funded by General Electric, the Nuclear Regulatory Commission and Electric Power Research Institute under the Refill-Reflood and FIST programs. At INEL (which has the main responsibility for the NRC version of TRAC-BWR) this work has led to the development of TRACBD1 and TRACBF1, while at GE, TRACB04 was the final product of the Refill-Reflood and FIST programs. TRAC development has continued at General Electric after the completion of these programs with the evolution of the TRACG code. The purpose of the paper is to describe this work. The TRAC development at General Electric can be divided into two main categories: extended benchmark capability and improved user convenience

  17. Trading green electricity

    International Nuclear Information System (INIS)

    Davies, M.

    1997-01-01

    A study has been carried out into the feasibility of developing an electricity trading mechanism which would allow consumers to purchase electricity which has been derived from renewable energy resources. This study was part funded by the European Commission (ALTENER), the Department of Trade and Industry and a number of private sector companies. The trading mechanism is known as the Green Pool. As a result of the findings of this study discussions are being held with potential generators and suppliers to establish a Green Pool plc. The aim is to encourage the development of new renewable energy projects outside the NFFO and SRO schemes. The Green Pool plc will be owned by the generators and its main objective will be to market the electricity produced by its members. (Author)

  18. The Energy Regulatory Commission (1). Law of the Comision Reguladora de Energia

    International Nuclear Information System (INIS)

    1995-01-01

    The Energy Regulatory Commission. Reforms to the Electric Energy Public Service Law (1992) and the Regulatory Law of Article 27 on Petroleum (1995) have brought about fundamental changes in the electric and natural gas industries. The legal reforms explicitly permit the private sector to construct, operate, and own, systems of electric generation and natural gas transportation, storage and distribution. The participation of the private sector in these areas required a redefinition in the government regulatory institutions. Accordingly the Federal Congress enacted the law of the Comision Reguladora de Energia (CRE) in 1995. The CRE law expands the scope of the CRE's authority and the breadth of its powers beyond those established when it was initially created in 1993. The CRE commenced operations in January 1994 as a decentralized technical and consultative body of the Energy Ministry. The decree that created the Commission limited the scope of its authority to an analysis and consultative role applicable only to the electric industry. (Author)

  19. Report made on behalf of the commission of economic affairs about the proposal of law aiming at authorizing the end-users to get back to the regulated power supply tariff, about the proposal of law aiming at authorizing the reversibility of the use of eligibility rights for the purchase of electric power, and about the proposal of law aiming at preserving the purchasing power of households by maintaining the regulated prices of electricity and natural gas; Rapport fait au nom de la commission des Affaires economiques sur la proposition de loi tendant a autoriser les consommateurs particuliers a retourner au tarif reglemente d'electricite, la proposition de loi reversibilite de l'exercice des droits relatifs a l'eligibilite pour l'achat d'energie electrique et la proposition de loi tendant a preserver le pouvoir d'achat des menages en maintenant les tarifs reglementes de vente d'electricite et de gaz naturel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This report concerns the examination of three proposals of law in relation with the regulated prices of electricity and gas. Since July 1, 2007, the French households can freely quit their historical energy supplier and subscribe to other suppliers with de-regulated energy prices. In front of the rise of free energy prices observed during the last years, some households who made the choice of free tariffs have encountered serious financial problems. For this reason, a law is proposed by the commission of economic affairs which aims at allowing the end-users to get back to the regulated tariffs of electricity and gas. (J.S.)

  20. Tie-down assessment of radioactive material packages on conveyances approach to competent authority approval applications in accordance with TS-R 1 (June 2000) and TS-G-1.1 (June 2002)

    Energy Technology Data Exchange (ETDEWEB)

    Read, J.; Owen, S.; Tso, C.F. [Arup, London (United Kingdom)

    2004-07-01

    This paper summarizes the authors' findings, during carrying out many package tie-down assessments, regarding the approach to the assessment process, and the issues that may arise. The current regulatory framework, as outlined in the abstract, is considered and possible areas for further development or research are discussed. The safe transport of a package containing radioactive material requires a secure system of retention on the conveyance during transport. The requirements for the assessment of this tie-down system are covered by International Atomic Energy Authority (IAEA) Regulations, and by the specific regulatory and guidance materials applying in the country of application. The IAEA regulations have recently been updated in TS-R-1 (June 2000) [1] and TS-G-1.1 (June 2002) [2]. In particular, Appendix V of reference [2] specifically covers 'Package Stowage and Retention during Transport'. In the United Kingdom the Transport Container Standardisation Committee (TCSC) provides guidance on the application of the IAEA regulations in TCSC 1006 ''The securing of Radioactive Materials on Conveyances'' [3], and this document has also been revised in December 2003. The basic requirement of the IAEA regulations is to maintain the integrity of the components of the package and its retention systems during routine operations (TS-R-1 Para 612). In accident conditions the package is permitted and may be required as part of the design (the weak-link approach as discussed later in this paper) to separate from the conveyance, while preserving the package integrity. Any tie-down attachments on the package shall be so designed that, under normal and accident conditions of transport, the forces in those attachments shall not impair the ability of the package to meet the requirements of the Regulations. (TS-R-1 Para 636).

  1. Tie-down assessment of radioactive material packages on conveyances approach to competent authority approval applications in accordance with TS-R 1 (June 2000) and TS-G-1.1 (June 2002)

    International Nuclear Information System (INIS)

    Read, J.; Owen, S.; Tso, C.F.

    2004-01-01

    This paper summarizes the authors' findings, during carrying out many package tie-down assessments, regarding the approach to the assessment process, and the issues that may arise. The current regulatory framework, as outlined in the abstract, is considered and possible areas for further development or research are discussed. The safe transport of a package containing radioactive material requires a secure system of retention on the conveyance during transport. The requirements for the assessment of this tie-down system are covered by International Atomic Energy Authority (IAEA) Regulations, and by the specific regulatory and guidance materials applying in the country of application. The IAEA regulations have recently been updated in TS-R-1 (June 2000) [1] and TS-G-1.1 (June 2002) [2]. In particular, Appendix V of reference [2] specifically covers 'Package Stowage and Retention during Transport'. In the United Kingdom the Transport Container Standardisation Committee (TCSC) provides guidance on the application of the IAEA regulations in TCSC 1006 ''The securing of Radioactive Materials on Conveyances'' [3], and this document has also been revised in December 2003. The basic requirement of the IAEA regulations is to maintain the integrity of the components of the package and its retention systems during routine operations (TS-R-1 Para 612). In accident conditions the package is permitted and may be required as part of the design (the weak-link approach as discussed later in this paper) to separate from the conveyance, while preserving the package integrity. Any tie-down attachments on the package shall be so designed that, under normal and accident conditions of transport, the forces in those attachments shall not impair the ability of the package to meet the requirements of the Regulations. (TS-R-1 Para 636)

  2. Report on the bill project on a new electricity market organisation in France (n. 2451)

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports the works of the Economic Affairs Commission of the French National Assembly on a bill project dealing with a new organisation of the electricity market. It reports the hearings of the Energy regulation commission Chairman and of the EDF Chairman, the general discussion of the Commission, and the discussion on the different bill articles. These articles are dealing with the access of electricity providers to the electricity produced by EDF, capacities required for electricity providers, power reservation contracts, and other regulatory aspects. A table compares the present situation, the content of the bill project, and the Commission's propositions

  3. Commission for Energy regulation (CRE) - Activity report june 2008; Commission de regulation de l'energie (CRE) - Rapport d'activite juin 2008

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2008 activity report of CRE. Content: A - How CRE works: CRE regulatory authority and organisation: Powers, Organisation; Budget resources; Personnel; B - The Standing Committee for Dispute Settlement and Sanctions (CoRDiS) activity: Admissibility, Authority; C - Building a single European energy market: Overview; Organisation and coordination of the main European regulators (Work carried out collectively by European regulators, Regulator organisation and development, CRE's relations with European Community institutions, Development of CEER activities outside the European Union); CRE's European activities (The contribution of European regulators to the Third Energy Package, Integration of gas markets, Integration of electricity markets, Operation of the European interconnected electricity grid and security of supply, Opening up markets to benefit consumers); European Community activities (The European Commission's proposals for the internal energy market: the Third Energy Package, The European Commission's proposals for fighting climate change: the Climate Package, Infringement

  4. Commission for Energy regulation (CRE) - Activity report june 2008; Commission de regulation de l'energie (CRE) - Rapport d'activite juin 2008

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2008 activity report of CRE. Content: A - How CRE works: CRE regulatory authority and organisation: Powers, Organisation; Budget resources; Personnel; B - The Standing Committee for Dispute Settlement and Sanctions (CoRDiS) activity: Admissibility, Authority; C - Building a single European energy market: Overview; Organisation and coordination of the main European regulators (Work carried out collectively by European regulators, Regulator organisation and development, CRE's relations with European Community institutions, Development of CEER activities outside the European Union); CRE's European activities (The contribution of European regulators to the Third Energy Package, Integration of gas markets, Integration of electricity markets, Operation of the European interconnected electricity grid and security of supply, Opening up markets to benefit consumers); European Community activities (The European Commission's proposals for the internal energy market: the Third Energy Package, The European Commission's proposals for fighting climate change: the Climate

  5. 77 FR 67637 - Equity and Excellence Commission

    Science.gov (United States)

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  6. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  7. 76 FR 4369 - Special Law Enforcement Commissions

    Science.gov (United States)

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  8. Ghana Atomic Energy Commission: Annual Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  9. The Lancet Commission on Syria | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  10. Ghana Atomic Energy Commission: Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  11. Niger Delta Development Commission and Sustainable ...

    African Journals Online (AJOL)

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  12. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  13. Commissioning and first data with the ATLAS silicon microstrip tracker

    International Nuclear Information System (INIS)

    Rohne, Ole Myren

    2010-01-01

    The ATLAS experiment at the CERN large hadron collider (LHC) has started taking data this autumn with the inauguration of the LHC. The semiconductor tracker (SCT) is the key precision tracking device in ATLAS, made up from silicon micro-strip detectors processed in the planar p-in-n technology. The completed SCT has recently been installed inside the ATLAS experimental hall. Quick tests were performed last year to verify the connectivity of the electrical and optical services. Problems observed with the heaters for the evaporative cooling system have been resolved. This has enabled extended operation of the full detector under realistic conditions. Calibration data has been taken and analysed to determine the noise performance of the system. In addition, extensive commissioning with cosmic ray events has been performed. The cosmic muon data has been used to align the detector, to check the timing of the front-end electronics as well as to measure the hit efficiency of modules. The current status of the SCT will be reviewed, including results from the latest data-taking periods in autumn 2008, and from the detector alignment. We will report on the commissioning of the detector, including overviews on services, connectivity and observed problems. Particular emphasis will also be placed on the SCT data taken in the latest running period with the entire ATLAS detector participating. The SCT commissioning and running experience will then be used to extract valuable lessons for future silicon strip detector projects.

  14. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  15. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  16. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  17. The rate of charge tunneling is insensitive to polar terminal groups in self-assembled monolayers in Ag(TS)S(CH2)(n)M(CH2)(m)T//Ga2O3/EGaIn junctions.

    Science.gov (United States)

    Yoon, Hyo Jae; Bowers, Carleen M; Baghbanzadeh, Mostafa; Whitesides, George M

    2014-01-08

    This paper describes a physical-organic study of the effect of uncharged, polar, functional groups on the rate of charge transport by tunneling across self-assembled monolayer (SAM)-based large-area junctions of the form Ag(TS)S(CH2)(n)M(CH2)(m)T//Ga2O3/EGaIn. Here Ag(TS) is a template-stripped silver substrate, -M- and -T are "middle" and "terminal" functional groups, and EGaIn is eutectic gallium-indium alloy. Twelve uncharged polar groups (-T = CN, CO2CH3, CF3, OCH3, N(CH3)2, CON(CH3)2, SCH3, SO2CH3, Br, P(O)(OEt)2, NHCOCH3, OSi(OCH3)3), having permanent dipole moments in the range 0.5 < μ < 4.5, were incorporated into the SAM. A comparison of the electrical characteristics of these junctions with those of junctions formed from n-alkanethiolates led to the conclusion that the rates of charge tunneling are insensitive to the replacement of terminal alkyl groups with the terminal polar groups in this set. The current densities measured in this work suggest that the tunneling decay parameter and injection current for SAMs terminated in nonpolar n-alkyl groups, and polar groups selected from common polar organic groups, are statistically indistinguishable.

  18. Improved Stabilization Conditions for Nonlinear Systems with Input and State Delays via T-S Fuzzy Model

    Directory of Open Access Journals (Sweden)

    Chang Che

    2018-01-01

    Full Text Available This paper focuses on the problem of nonlinear systems with input and state delays. The considered nonlinear systems are represented by Takagi-Sugeno (T-S fuzzy model. A new state feedback control approach is introduced for T-S fuzzy systems with input delay and state delays. A new Lyapunov-Krasovskii functional is employed to derive less conservative stability conditions by incorporating a recently developed Wirtinger-based integral inequality. Based on the Lyapunov stability criterion, a series of linear matrix inequalities (LMIs are obtained by using the slack variables and integral inequality, which guarantees the asymptotic stability of the closed-loop system. Several numerical examples are given to show the advantages of the proposed results.

  19. MoMuLV-ts-1: A Unique Mouse Model of Retrovirus-Induced Lymphoma Transmitted by Breast Milk

    Directory of Open Access Journals (Sweden)

    J. Chakraborty

    2011-01-01

    Full Text Available Our laboratory has developed a murine model of lymphoma via breast milk transmission of MoMuLV-ts-1 (Moloney murine leukemia virus-temperature sensitive mutant-1. Uninfected offspring suckled from infected surrogate mothers become infected and develop lymphoma. Multiple gene integration sites of ts-1 into the infected mouse genome including tacc3, aurka, ndel1, tpx2, p53, and rhamm were identified, and mRNA expressions were quantitated. These genes produce centrosomal proteins, which may be involved in abnormal chromosomal segregation leading to aneuploidy or multiploidy, thus causing lymphoma. Since there is no report to date on this retroviral model leading to centrosomal abnormality, and causing lymphoma development, this is a valuable and unique model to study the centrosomal involvement in lymphomagenesis.

  20. Robust fuzzy output feedback controller for affine nonlinear systems via T-S fuzzy bilinear model: CSTR benchmark.

    Science.gov (United States)

    Hamdy, M; Hamdan, I

    2015-07-01

    In this paper, a robust H∞ fuzzy output feedback controller is designed for a class of affine nonlinear systems with disturbance via Takagi-Sugeno (T-S) fuzzy bilinear model. The parallel distributed compensation (PDC) technique is utilized to design a fuzzy controller. The stability conditions of the overall closed loop T-S fuzzy bilinear model are formulated in terms of Lyapunov function via linear matrix inequality (LMI). The control law is robustified by H∞ sense to attenuate external disturbance. Moreover, the desired controller gains can be obtained by solving a set of LMI. A continuous stirred tank reactor (CSTR), which is a benchmark problem in nonlinear process control, is discussed in detail to verify the effectiveness of the proposed approach with a comparative study. Copyright © 2014 ISA. Published by Elsevier Ltd. All rights reserved.

  1. Deriving and Analyzing Analytical Structures of a Class of Typical Interval Type-2 TS Fuzzy Controllers.

    Science.gov (United States)

    Zhou, Haibo; Ying, Hao

    2017-09-01

    A conventional controller's explicit input-output mathematical relationship, also known as its analytical structure, is always available for analysis and design of a control system. In contrast, virtually all type-2 (T2) fuzzy controllers are treated as black-box controllers in the literature in that their analytical structures are unknown, which inhibits precise and comprehensive understanding and analysis. In this regard, a long-standing fundamental issue remains unresolved: how a T2 fuzzy set's footprint of uncertainty, a key element differentiating a T2 controller from a type-1 (T1) controller, affects a controller's analytical structure. In this paper, we describe an innovative technique for deriving analytical structures of a class of typical interval T2 (IT2) TS fuzzy controllers. This technique makes it possible to analyze the analytical structures of the controllers to reveal the role of footprints of uncertainty in shaping the structures. Specifically, we have mathematically proven that under certain conditions, the larger the footprints, the more the IT2 controllers resemble linear or piecewise linear controllers. When the footprints are at their maximum, the IT2 controllers actually become linear or piecewise linear controllers. That is to say the smaller the footprints, the more nonlinear the controllers. The most nonlinear IT2 controllers are attained at zero footprints, at which point they become T1 controllers. This finding implies that sometimes if strong nonlinearity is most important and desired, one should consider using a smaller footprint or even just a T1 fuzzy controller. This paper exemplifies the importance and value of the analytical structure approach for comprehensive analysis of T2 fuzzy controllers.

  2. Design and baseline characteristics of the Short bouTs of Exercise for Preschoolers (STEP) study.

    Science.gov (United States)

    Alhassan, Sofiya; Nwaokelemeh, Ogechi; Mendoza, Albert; Shitole, Sanyog; Whitt-Glover, Melicia C; Yancey, Antronette K

    2012-08-01

    Most preschool centers provide two 30-min sessions of gross-motor/outdoor playtime per preschool day. Within this time frame, children accumulate most of their activity within the first 10 min. This paper describes the design and baseline participant characteristics of the Short bouTs of Exercise for Preschoolers (STEP) study. The STEP study is a cluster randomized controlled study designed to examine the effects of short bouts of structured physical activity (SBS-PA) implemented within the classroom setting as part of designated gross-motor playtime on during-school physical activity (PA) in preschoolers. Ten preschool centers serving low-income families were randomized into SBS-PA versus unstructured PA (UPA). SBS-PA schools were asked to implement age-appropriate 10 min structured PA routines within the classroom setting, twice daily, followed by 20 min of usual unstructured playtime. UPA intervention consisted of 30 min of supervised unstructured free playtime twice daily. Interventions were implemented during the morning and afternoon designated gross-motor playtime for 30 min/session, five days/week for six months. Outcome measures were between group difference in during-preschool PA (accelerometers and direct observation) over six-months. Ten preschool centers, representing 34 classrooms and 315 children, enrolled in the study. The average age and BMI percentile for the participants was 4.1 ± 0.8 years and 69th percentile, respectively. Participants spent 74% and 6% of their preschool day engaged in sedentary and MVPA, respectively. Results from the STEP intervention could provide evidence that a PA policy that exposes preschoolers to shorter bouts of structured PA throughout the preschool day could potentially increase preschoolers' PA levels.

  3. Design and baseline characteristics of the Short bouTs of Exercise for Preschoolers (STEP study

    Directory of Open Access Journals (Sweden)

    Alhassan Sofiya

    2012-08-01

    Full Text Available Abstract Background Most preschool centers provide two 30-min sessions of gross-motor/outdoor playtime per preschool day. Within this time frame, children accumulate most of their activity within the first 10 min. This paper describes the design and baseline participant characteristics of the Short bouTs of Exercise for Preschoolers (STEP study. The STEP study is a cluster randomized controlled study designed to examine the effects of short bouts of structured physical activity (SBS-PA implemented within the classroom setting as part of designated gross-motor playtime on during-school physical activity (PA in preschoolers. Methods/Design Ten preschool centers serving low-income families were randomized into SBS-PA versus unstructured PA (UPA. SBS-PA schools were asked to implement age-appropriate 10 min structured PA routines within the classroom setting, twice daily, followed by 20 min of usual unstructured playtime. UPA intervention consisted of 30 min of supervised unstructured free playtime twice daily. Interventions were implemented during the morning and afternoon designated gross-motor playtime for 30 min/session, five days/week for six months. Outcome measures were between group difference in during-preschool PA (accelerometers and direct observation over six-months. Ten preschool centers, representing 34 classrooms and 315 children, enrolled in the study. The average age and BMI percentile for the participants was 4.1 ± 0.8 years and 69th percentile, respectively. Participants spent 74% and 6% of their preschool day engaged in sedentary and MVPA, respectively. Discussion Results from the STEP intervention could provide evidence that a PA policy that exposes preschoolers to shorter bouts of structured PA throughout the preschool day could potentially increase preschoolers’ PA levels. Trial registration Clinicaltrials.gov, NCT01588392

  4. WIAMan Technology Demonstrator Sensor Codes Conforming to International Organization for Standardization/Technical Standard (ISO/TS) 13499

    Science.gov (United States)

    2016-03-01

    of this collection of information, including suggestions for reducing  the burden, to Department of Defense, Washington Headquarters  Services ...ISO)- Multimedia Exchange task force is responsible for maintaining the specification for the multimedia data exchange format for impact tests outlined...channel codes, ATD, multimedia exchange format, ISO/TS 13499 36 Michael B Tegtmeyer 410-278-6074Unclassified Unclassified Unclassified UU ii

  5. Tensile strength/yield strength (TS/YS) ratios of high-strength steel (HSS) reinforcing bars

    Science.gov (United States)

    Tavio, Anggraini, Retno; Raka, I. Gede Putu; Agustiar

    2018-05-01

    The building codes such as American Concrete Institute (ACI) 318M-14 and Standard National Indonesia (SNI) 2847:2013 require that the ratio of tensile strength (TS) and yield strength (YS) should not less than 1.25. The requirement is based on the assumption that a capability of a structural member to develop inelastic rotation capacity is a function of the length of the yield region. This paper reports an investigation on various steel grades, namely Grades 420, 550, 650, and 700 MPa, to examine the impact of different TS/YS ratios if it is less or greater than the required value. Grades 550, 650, and 700 MPa were purposely selected with the intention to examine if these higher grades are still promising to be implemented in special structural systems since they are prohibited by the building codes for longitudinal reinforcement, whereas Grade 420 MPa bars are the maximum limit of yield strength of reinforcing bars that is allowable for longitudinal reinforcement of special structural systems. Tensile tests of these steel samples were conducted under displacement controlled mode to capture the complete stress-strain curves and particularly the post-yield response of the steel bars. From the study, it can be concluded that Grade 420 performed higher TS/YS ratios and they were able to reach up to more than 1.25. However, the High Strength Still (HSS) bars (Grades 550, 600, and 700 MPa) resulted in lower TS/YS ratios (less than 1.25) compared with those of Grade 420 MPa.

  6. A route to hydroxylfluorenes: TsOH-mediated condensation reactions of 1,3-diketones with propargylic alcohols

    KAUST Repository

    Yao, Liangfeng

    2012-01-01

    An efficient method of preparing hydroxylfluorenes by TsOH-mediated tandem alkylation/rearrangements of propargylic alcohols with 1,3-diketones is described. These reactions are accomplished in moderate to good yields under mild conditions to offer a straightforward and convenient one step synthetic route to hydroxylfluorene derivatives through a plausible mechanism involving a sequence of dehydration, addition, rearrangement and aromatization. This journal is © The Royal Society of Chemistry 2012.

  7. LHC optics determination with proton tracks measured in the CT-PPS detectors in 2016, before TS2

    CERN Document Server

    Nemes, F

    2017-01-01

    Novel optics estimation methods have been developed for the CMS-TOTEM Precision Proton Spectrometer (CT-PPS), in order to determine the horizontal dispersion function $D_{x}$ and the orbit between IP5 and the Roman Pot detectors. The tools have been successfully applied at $\\sqrt{s} = $13 TeV collision energy and $\\beta^{*} = $0.4 m optics with $\\alpha = 370\\,\\mu$rad horizontal crossing angle (settings valid in 2016 before Technical Stop 2 - TS2).

  8. Geomagnetic activity at Northern Hemisphere's mid-latitude ground stations: How much can be explained using TS05 model

    Science.gov (United States)

    Castillo, Yvelice; Pais, Maria Alexandra; Fernandes, João; Ribeiro, Paulo; Morozova, Anna L.; Pinheiro, Fernando J. G.

    2017-12-01

    For the 2007 to 2014 period, we use a statistical approach to evaluate the performance of Tsyganenko and Sitnov [2005] semi-empirical model (TS05) in estimating the magnetospheric transient signal observed at four Northern Hemisphere mid-latitude ground stations: Coimbra, Portugal; Panagyurishte, Bulgary; Novosibirsk, Russia and Boulder, USA. Using hourly mean data, we find that the TS05 performance is clearly better for the X (North-South) than for the Y (East-West) field components and for more geomagnetically active days as determined by local K-indices. In ∼ 50% (X) and ∼ 30% (Y) of the total number of geomagnetically active days, correlation values yield r ≥ 0.7. During more quiet conditions, only ∼ 30% (X) and ∼ 15% (Y) of the number of analyzed days yield r ≥ 0.7. We compute separate contributions from different magnetospheric currents to data time variability and to signal magnitude. During more active days, all tail, symmetric ring and partial ring currents contribute to the time variability of X while the partial ring and field aligned currents contribute most to the time variability of Y. The tail and symmetric ring currents are main contributors to the magnitude of X. In the best case estimations when r ≥ 0.7, remaining differences between observations and TS05 predictions could be explained by global induction in the Earth's upper layers and crustal magnetization. The closing of field aligned currents through the Earth's center in the TS05 model seems to be mainly affecting the Y magnetospheric field predictions.

  9. Facile Synthesis of Yolk/Core-Shell Structured TS-1@Mesosilica Composites for Enhanced Hydroxylation of Phenol

    KAUST Repository

    Zou, Houbing

    2015-12-14

    © 2015 by the authors. In the current work, we developed a facile synthesis of yolk/core-shell structured TS-1@mesosilica composites and studied their catalytic performances in the hydroxylation of phenol with H2O2 as the oxidant. The core-shell TS-1@mesosilica composites were prepared via a uniform coating process, while the yolk-shell TS-1@mesosilica composite was prepared using a resorcinol-formaldehyde resin (RF) middle-layer as the sacrificial template. The obtained materials were characterized by X-ray diffraction (XRD), N2 sorption, Fourier transform infrared spectoscopy (FT-IR) UV-Visible spectroscopy, scanning electron microscopy (SEM) and transmission electron microscopy (TEM). The characterization results showed that these samples possessed highly uniform yolk/core-shell structures, high surface area (560–700 m2 g−1) and hierarchical pore structures from oriented mesochannels to zeolite micropores. Importantly, owing to their unique structural properties, these composites exhibited enhanced activity, and also selectivity in the phenol hydroxylation reaction.

  10. Short-lived non-coding transcripts (SLiTs): Clues to regulatory long non-coding RNA.

    Science.gov (United States)

    Tani, Hidenori

    2017-03-22

    Whole transcriptome analyses have revealed a large number of novel long non-coding RNAs (lncRNAs). Although the importance of lncRNAs has been documented in previous reports, the biological and physiological functions of lncRNAs remain largely unknown. The role of lncRNAs seems an elusive problem. Here, I propose a clue to the identification of regulatory lncRNAs. The key point is RNA half-life. RNAs with a long half-life (t 1/2 > 4 h) contain a significant proportion of ncRNAs, as well as mRNAs involved in housekeeping functions, whereas RNAs with a short half-life (t 1/2 regulatory ncRNAs and regulatory mRNAs. This novel class of ncRNAs with a short half-life can be categorized as Short-Lived non-coding Transcripts (SLiTs). I consider that SLiTs are likely to be rich in functionally uncharacterized regulatory RNAs. This review describes recent progress in research into SLiTs.

  11. Commission of the Economic Affairs, the Environment and the Territory. Report no. 19

    International Nuclear Information System (INIS)

    Ollier, P.; Gonnot, F.M.

    2002-12-01

    In the framework of the ''article 88'' application, concerning the law project nO. 306, the commission adjudged decisions on the following topics:the natural gas network access, the natural gas sector regulation and transparency, the gas utilities, the natural gas distribution and transport, the underground storage, the electric utilities. (A.L.B.)

  12. Commission of the Economic Affairs, the Environment and the Territory. Report no. 18

    International Nuclear Information System (INIS)

    Ollier, P.; Gonnot, F.M.

    2002-12-01

    In the framework of the ''article 88'' application,concerning the law project no. 306, the commission adjudged decisions on the following topics:the natural gas network access, the natural gas sector regulation and transparency, the gas utilities, the natural gas distribution and transport, the underground storage, the electric utilities. (A.L.B.)

  13. Presentation to the Atomic Energy Commission and the Air Force, June 14, 1962

    Energy Technology Data Exchange (ETDEWEB)

    none

    1962-10-01

    This volume contains the charts and backup material presented to the Atomic Energy Commission and Air Force on June 14, 1962 concerning General Electric's Nuclear Materials and Propulsion Operation (formerly the Aircraft Nuclear Propulsion Department), during its work on the development of a nuclear power plant for manned aircraft.

  14. 75 FR 41840 - Commission Information Collection Activities (FERC-919); Comment Request; Extension

    Science.gov (United States)

    2010-07-19

    ... or potential abuses of market power, and enable the Commission to determine whether continued market... Power Act (FPA) sections 205 and 206. Section 205 of the FPA requires just and reasonable rates and... market power analyses and related reports. \\1\\ Market-Based Rates for Wholesale Sales of Electric Energy...

  15. 75 FR 35001 - Commission Information Collection Activities (FERC-FERC-725E); Comment Request; Extension

    Science.gov (United States)

    2010-06-21

    ...://www.ferc.gov/help/submission-guide.asp . eFiling instructions are available at: http://www.ferc.gov... Commission's efforts to strengthen the reliability of the interstate grid through the grant of new authority by providing for a system of mandatory Reliability Standards developed by the Electric Reliability...

  16. 18 CFR 39.6 - Conflict of a Reliability Standard with a Commission Order.

    Science.gov (United States)

    2010-04-01

    ... Reliability Standard with a Commission Order. 39.6 Section 39.6 Conservation of Power and Water Resources..., APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.6 Conflict of a Reliability Standard with... Transmission Organization determines that a Reliability Standard may conflict with a function, rule, order...

  17. The European Commission's light bulb decree: Another costly regulation?

    International Nuclear Information System (INIS)

    Frondel, Manuel; Lohmann, Steffen

    2011-01-01

    Since September 2009, Regulation 244/2009 of the European Commission enforces the gradual phase-out of incandescent light bulbs. As of September 2012, only energy-efficient lighting sources will be allowed for sale. Among these are halogen light bulbs, light-emitting diodes (LED), or compact fluorescent light bulbs-often referred to as energy-saving light bulbs. The Commission's justification for the phase-out of conventional light bulbs maintains that a reduction in the electricity consumed will not only lead to lower energy cost for private households and industrial consumers, but at the same time lead to a decrease in greenhouse gas emissions. This article discusses possible reasons for the slow market diffusion of energy-saving light bulbs and shows that the investment in energy-efficient light bulbs does not necessarily lead to significant cost reductions. Drawing on some illustrative examples, we demonstrate that the use of cheaper incandescent bulbs instead of energy-saving light bulbs can be economically rational in cases of rather low usage times, in which the higher initial purchasing price might only pay off after very long time spans. Furthermore, due to the coexistence with the European Emissions Trading Scheme (ETS), this regulation attains no additional emission reductions beyond those achieved by the ETS alone. We thus conclude that the general ban of incandescent light bulbs is inappropriate and should be abolished by the Commission. - Research highlights: → This article discusses reasons for the slow market diffusion of energy-saving light bulbs. → We show that using incandescent bulbs can be rational in cases of rather low usage times. → We conclude that the general ban of incandescent light bulbs should be abolished by the Commission.

  18. A novel stabilization condition for T-S polynomial fuzzy system with time-delay:A sum-of-squares approach

    OpenAIRE

    Tsai, Shun Hung; Chen, Yu-An; Chen, Yu-Wen; Lo, Ji-Chang; Lam, Hak-Keung

    2017-01-01

    A novel stabilization problem for T-S polynomial fuzzy system with time-delay is investigated in this paper. Firstly, a polynomial fuzzy controller for T-S polynomial fuzzy system with time-delay is proposed. In addition, based on polynomial Lyapunov-Krasovskii function and the developed polynomial slack variable matrices, a novel stabilization condition for T-S polynomial fuzzy system with time-delay is presented in terms of sum-of-square (SOS) form. Lastly, nonlinear system with time-delay ...

  19. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  20. 76 FR 24465 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-05-02

    ... Electric Company Notice of Application Tendered for Filing With the Commission and Establishing Procedural... Gas and Electric Company. e. Name of Project: Drum-Spaulding Project. f. Location: The west slope of..., Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA 94177-0001, (415) 973-4481, or e-mail...