  1. Transmission-constrained oligopoly in the Japanese electricity market

    International Nuclear Information System (INIS)

    Tanaka, Makoto

    2009-01-01

    We simulate the Japanese wholesale electricity market as a transmission-constrained Cournot market using a linear complementarity approach. First, we investigate the effects of upgrading the bottleneck transmission line between the eastern and western regions, focusing on the mitigation of transmission congestion. Although increasing the bottleneck capacity would lead to welfare gains, they might not be substantial particularly when transmission capacity costs are taken into account. Second, we examine the effects of splitting the largest electric power company, which is located in the eastern region, focusing on the mitigation of market power. Splitting the largest company into two companies would lead to a 25% reduction in the eastern price, and a 50% reduction in deadweight loss. The divestiture of the largest company would have a significant effect of mitigating market power in the Japanese electricity market. (author)

  2. Estimating zonal electricity supply curves in transmission-constrained electricity markets

    International Nuclear Information System (INIS)

    Sahraei-Ardakani, Mostafa; Blumsack, Seth; Kleit, Andrew

    2015-01-01

    Many important electricity policy initiatives would directly affect the operation of electric power networks. This paper develops a method for estimating short-run zonal supply curves in transmission-constrained electricity markets that can be implemented quickly by policy analysts with training in statistical methods and with publicly available data. Our model enables analysis of distributional impacts of policies affecting operation of electric power grid. The method uses fuel prices and zonal electric loads to determine piecewise supply curves, identifying zonal electricity price and marginal fuel. We illustrate our methodology by estimating zonal impacts of Pennsylvania's Act 129, an energy efficiency and conservation policy. For most utilities in Pennsylvania, Act 129 would reduce the influence of natural gas on electricity price formation and increase the influence of coal. The total resulted savings would be around 267 million dollars, 82 percent of which would be enjoyed by the customers in Pennsylvania. We also analyze the impacts of imposing a $35/ton tax on carbon dioxide emissions. Our results show that the policy would increase the average prices in PJM by 47–89 percent under different fuel price scenarios in the short run, and would lead to short-run interfuel substitution between natural gas and coal. - Highlights: • We develop a method to estimate of zonal supply curves in electricity markets. • The model estimates zonal electricity prices and zonal fuel utilization. • The model implicitly captures the average impacts of transmission constraints. • Using the method, we project supply curves for the seventeen utility zones of PJM. • We use the estimated supply curves to study the impacts of Pennsylvania's Act 129 and a carbon tax of $35 per ton

  3. Economic impact assessment and operational decision making in emission and transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nanduri, Vishnu; Kazemzadeh, Narges

    2012-01-01

    Highlights: ► We develop a bilevel game-theoretic model for allowance and electricity markets. ► We solve the model using a reinforcement learning algorithm. ► Model accounts for transmission constraints, cap-and-trade constraints. ► Study demonstrated on 9-bus electric power network. ► Obtain insights about supply shares, impact of transmission constraints, and cost pass through. -- Abstract: Carbon constrained electricity markets are a reality in 10 northeastern states and California in the US, as well as the European Union. Close to a Billion US Dollars have been spent by entities (mainly generators) in the Regional Greenhouse Gas Initiative in procuring CO 2 allowances to meet binding emissions restrictions. In the near future, there are expected to be significant impacts due to the cap-and-trade program, especially when the cap stringency increases. In this research we develop a bilevel, complete-information, matrix game-theoretic model to assess the economic impact and make operational decisions in carbon-constrained restructured electricity markets. Our model is solved using a reinforcement learning approach, which takes into account the learning and adaptive nature of market participants. Our model also accounts for all the power systems constraints via a DC-OPF problem. We demonstrate the working of the model and compute various economic impact indicators such as supply shares, cost pass-through, social welfare, profits, allowance prices, and electricity prices. Results from a 9-bus power network are presented.

  4. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  5. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  6. Supply curve bidding of electricity in constrained power networks

    Energy Technology Data Exchange (ETDEWEB)

    Al-Agtash, Salem Y. [Hijjawi Faculty of Engineering; Yarmouk University; Irbid 21163 (Jordan)

    2010-07-15

    This paper presents a Supply Curve Bidding (SCB) approach that complies with the notion of the Standard Market Design (SMD) in electricity markets. The approach considers the demand-side option and Locational Marginal Pricing (LMP) clearing. It iteratively alters Supply Function Equilibria (SFE) model solutions, then choosing the best bid based on market-clearing LMP and network conditions. It has been argued that SCB better benefits suppliers compared to fixed quantity-price bids. It provides more flexibility and better opportunity to achieving profitable outcomes over a range of demands. In addition, SCB fits two important criteria: simplifies evaluating electricity derivatives and captures smooth marginal cost characteristics that reflect actual production costs. The simultaneous inclusion of physical unit constraints and transmission security constraints will assure a feasible solution. An IEEE 24-bus system is used to illustrate perturbations of SCB in constrained power networks within the framework of SDM. By searching in the neighborhood of SFE model solutions, suppliers can obtain their best bid offers based on market-clearing LMP and network conditions. In this case, electricity producers can derive their best offering strategy both in the power exchange and the long-term contractual markets within a profitable, yet secure, electricity market. (author)

  7. Supply curve bidding of electricity in constrained power networks

    International Nuclear Information System (INIS)

    Al-Agtash, Salem Y.

    2010-01-01

    This paper presents a Supply Curve Bidding (SCB) approach that complies with the notion of the Standard Market Design (SMD) in electricity markets. The approach considers the demand-side option and Locational Marginal Pricing (LMP) clearing. It iteratively alters Supply Function Equilibria (SFE) model solutions, then choosing the best bid based on market-clearing LMP and network conditions. It has been argued that SCB better benefits suppliers compared to fixed quantity-price bids. It provides more flexibility and better opportunity to achieving profitable outcomes over a range of demands. In addition, SCB fits two important criteria: simplifies evaluating electricity derivatives and captures smooth marginal cost characteristics that reflect actual production costs. The simultaneous inclusion of physical unit constraints and transmission security constraints will assure a feasible solution. An IEEE 24-bus system is used to illustrate perturbations of SCB in constrained power networks within the framework of SDM. By searching in the neighborhood of SFE model solutions, suppliers can obtain their best bid offers based on market-clearing LMP and network conditions. In this case, electricity producers can derive their best offering strategy both in the power exchange and the long-term contractual markets within a profitable, yet secure, electricity market. (author)

  8. Effects of long-term contracts on firms exercising market power in transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nam, Young Woo; Yoon, Yong Tae; Park, Jong-Keun; Hur, Don; Kim, Sung-Soo

    2006-01-01

    The electricity markets with only few large firms are often vulnerable to less competitive behaviors than the desired. The presence of transmission constraints further restrict the competition among firms and provide more opportunities for firms to exercise market power. While it is generally acknowledged that the long-term contracts provide good measures for mitigating market power in the spot market (thus reducing undesired price spikes), it is not even more clear how effective these contracts are if the market is severely limited due to transmission constraints. In this paper, an analytical approach through finding a Nash equilibrium is presented to investigate the effects of long-term contracts on firms exercising market power in a bid-based pool with transmission constraints. Surprisingly the analysis in this paper shows that the presence of long-term contracts may result in the reduced expected social welfare. A straightforward consequence of the analysis presented in this paper will be helpful for the regulators in Korea to reconsider offering vesting contracts to generating companies in the near future. (author)

  9. Wildlife and electric power transmission

    Science.gov (United States)

    Ellis, D.H.; Goodwin, J.G.; Hunt, J.R.; Fletcher, John L.; Busnel, R.G.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  10. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  11. Wireless (Power Transfer Transmission of Electrical Energy (Electricity Intended for Consumer Purposes up to 50 W

    Directory of Open Access Journals (Sweden)

    Marek Piri

    2016-01-01

    Full Text Available This project deals with Power Semiconductor Systems PSS for wireless transmission of electricity to the power of 50~W with regard to the distance and transmission efficiency. We decided to use electromagnetic resonance for electrical energy transmission. For experimental verification, we have wound two coils of identical dimensions. At a given power transmission solutions, we obtain the highest efficiency η = 70% at a distance of 5 cm, where the transmitted power was 48 W.

  12. Electric power transmission pricing regulations and efficiency

    International Nuclear Information System (INIS)

    Goldoni, G.

    1999-01-01

    An efficient-price mechanism for electricity transmission is very hard to find, essentially because of the natural monopoly condition of the grid and its peculiar interactions with generation. The use of Optimal Power Flow Models is difficult to implement and could be easily distorted by strategical behaviour of generators. These models, however, could became a valuable efficiency-test for actual transmission charges and codes [it

  13. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  14. Transmission rights and market power on electric power networks. 2. Physical rights

    International Nuclear Information System (INIS)

    Joskow, Paul; Tirole, Jean

    1999-01-01

    This discussion paper examines physical transmission rights where the capacity of each potentially congested interface is defined and the rights to use the congested interfaces are created and allocated in some way for suppliers and consumers. The way in which the allocation of physical rights affects competition or increases the buyers or sellers market power in the power generation market when a transmission interface is congested, and how rights markets with different microstructures allocate physical rights and determine rights prices are explored. An electricity market with physical transmission rights in the absence of capacity release rules, and physical transmission rights and market power are addressed. Loop flows, and capacity release rules are discussed. (UK)

  15. Environmental concerns regarding electric power transmission in North America

    International Nuclear Information System (INIS)

    DeCicco, J.M.; Bernow, S.S.; Beyea, J.

    1992-01-01

    The electric utilities of North America have become ever more interconnected via transmission facilities, largely to insure reliability. Current policy discussions regarding transmission include calls for improved access, increased capacity, and deregulation to facilitate trade in electric power. From an environmental perspective, two issues have been notably absent in much of the debate: (1) a recognition of the full range of environmental impacts related to electricity transmission; and (2) the potential for end-use efficiency to address the reliability and economy requirements that motivate attention to transmission. This paper broaches these issues, starting with an elaboration of the environmental impacts, which range from global and regional effects to local concerns, including the potential health risks associated with electric and magnetic fields. We emphasize that transmission planning should occur as part of an integrated planning process, in which the environmental and social costs of various options are fully considered. We discuss the potential for end-use efficiency to lessen environmental impacts of both transmission and generation. We conclude that there is a need to ensure that environmental externalities and demand-side alternatives are adequately considered when transmission network expansions are proposed. (Author)

  16. Creating a robust and integrated electrical transmission system

    International Nuclear Information System (INIS)

    McLain, S.

    2004-01-01

    The service territory for Puget Sound Energy (PSE) was presented in terms of electric power and gas transmission. Issues affecting the Puget Sound area include high growth and the west coast energy crisis which has had an adverse financial impact on the power industry. The transmission system is basically at capacity and has been impacted by imports and exports between the United States and Canada. Other issues include the separation between energy resources and transmission, modernizing the power grid, and challenges for independent power producers (IPPs). The Northwest Transmission Assessment Committee (NTAC), which was formed under the Northwest Power Pool, has the potential to bring interested parties to study constrained paths and to plan a single utility concept for the region. It is expected that new challenges such as financing and risk management will emerge once the technical solutions are identified and agreed upon. The issue of enforceable and mandatory reliability standards was also discussed. 1 fig

  17. Short-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Wang, Yubin Mao; Wang, Jiangbo; He, Dandan

    2018-04-01

    Short-term electricity demand forecasting is the basic work to ensure safe operation of the power system. In this paper, a practical economic electricity transmission model (EETM) is built. With the intelligent adaptive modeling capabilities of Prognoz Platform 7.2, the econometric model consists of three industrial added value and income levels is firstly built, the electricity demand transmission model is also built. By multiple regression, moving averages and seasonal decomposition, the problem of multiple correlations between variables is effectively overcome in EETM. The validity of EETM is proved by comparison with the actual value of Henan Province. Finally, EETM model is used to forecast the electricity consumption of the 1-4 quarter of 2018.

  18. Electric transmission technology

    International Nuclear Information System (INIS)

    Shah, K.R.

    1990-01-01

    Electric transmission technology has matured and can transmit bulk power more reliably and economically than the technology 10 years ago.In 1882, Marcel Depres transmitted 15 kW electric power at 2 kV, using a constant direct current; present transmission voltages have risen to ± 600 kV direct current (DC) and 765 kV alternating current (AC), and it is now possible to transmit bulk electric power at voltages as high as ± 1000 kV DC and 1500 kV AC. Affordable computer systems are now available to optimize transmission reliably. New materials have reduced the bulk of insulation for lines and equipment. New conducting materials and configurations have reduced losses in transmission. Advances in line structures and conductor motion, understanding of flashover characteristics of insulators and air-gaps and electrical performance of lines have resulted in more compact urban transmission lines. (author). 15 refs., 7 tabs., 11 figs

  19. A literature survey on asset management in electrical power [transmission and distribution] system

    OpenAIRE

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on transmission and distribution assets that include transmission lines, power transformers, protection devices, substation equipment and support structures. This study aims to provide a detailed exposure to ass...

  20. Transmission pricing and stranded costs in the electric power industry

    International Nuclear Information System (INIS)

    Baumol, W.J.; Sidak, J.G.

    1995-09-01

    Stranded costs are those costs that electric utilities are currently permitted to recover through their rates but whose recovery may be impeded or prevented by the advent of competition in the industry. Estimates of these costs run from the tens to the hundreds of billions of dollars. Should regulators permit utilities to recover stranded costs while they take steps to promote competition in the electric power industry. William Baumol and J. Gregory Sidak argue that answer to that question should be yes.The authors show that a transmission price, the price for sending electricity over the transmission grid, can be determined in a manner that is compatible with economic efficiency and clearly neutral in its effects upon all competitors in electricity generation. A correctly constructed regime of transmission pricing may in fact achieve the efficiency and equity goals that justify the recovery of stranded costs

  1. Probabilistic Constrained Load Flow Considering Integration of Wind Power Generation and Electric Vehicles

    DEFF Research Database (Denmark)

    Vlachogiannis, Ioannis (John)

    2009-01-01

    A new formulation and solution of probabilistic constrained load flow (PCLF) problem suitable for modern power systems with wind power generation and electric vehicles (EV) demand or supply is represented. The developed stochastic model of EV demand/supply and the wind power generation model...... are incorporated into load flow studies. In the resulted PCLF formulation, discrete and continuous control parameters are engaged. Therefore, a hybrid learning automata system (HLAS) is developed to find the optimal offline control settings over a whole planning period of power system. The process of HLAS...

  2. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  3. Impacts of rising air temperatures on electric transmission ampacity and peak electricity load in the United States

    Science.gov (United States)

    Bartos, Matthew; Chester, Mikhail; Johnson, Nathan; Gorman, Brandon; Eisenberg, Daniel; Linkov, Igor; Bates, Matthew

    2016-11-01

    Climate change may constrain future electricity supply adequacy by reducing electric transmission capacity and increasing electricity demand. The carrying capacity of electric power cables decreases as ambient air temperatures rise; similarly, during the summer peak period, electricity loads typically increase with hotter air temperatures due to increased air conditioning usage. As atmospheric carbon concentrations increase, higher ambient air temperatures may strain power infrastructure by simultaneously reducing transmission capacity and increasing peak electricity load. We estimate the impacts of rising ambient air temperatures on electric transmission ampacity and peak per-capita electricity load for 121 planning areas in the United States using downscaled global climate model projections. Together, these planning areas account for roughly 80% of current peak summertime load. We estimate climate-attributable capacity reductions to transmission lines by constructing thermal models of representative conductors, then forcing these models with future temperature projections to determine the percent change in rated ampacity. Next, we assess the impact of climate change on electricity load by using historical relationships between ambient temperature and utility-scale summertime peak load to estimate the extent to which climate change will incur additional peak load increases. We find that by mid-century (2040-2060), increases in ambient air temperature may reduce average summertime transmission capacity by 1.9%-5.8% relative to the 1990-2010 reference period. At the same time, peak per-capita summertime loads may rise by 4.2%-15% on average due to increases in ambient air temperature. In the absence of energy efficiency gains, demand-side management programs and transmission infrastructure upgrades, these load increases have the potential to upset current assumptions about future electricity supply adequacy.

  4. Network-constrained Cournot models of liberalized electricity markets. The devil is in the details

    Energy Technology Data Exchange (ETDEWEB)

    Neuhoff, Karsten [Department of Applied Economics, Sidgwick Ave., University of Cambridge, CB3 9DE (United Kingdom); Barquin, Julian; Vazquez, Miguel [Instituto de Investigacion Tecnologica, Universidad Pontificia Comillas, c/Santa Cruz de Marcenado 26-28015 Madrid (Spain); Boots, Maroeska G. [Energy Research Centre of the Netherlands ECN, Badhuisweg 3, 1031 CM Amsterdam (Netherlands); Ehrenmann, Andreas [Judge Institute of Management, University of Cambridge, Trumpington Street, CB2 1AG (United Kingdom); Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Rijkers, Fieke A.M. [Contributed while at ECN, now at Nederlandse Mededingingsautoriteit (NMa), Dte, Postbus 16326, 2500 BH Den Haag (Netherlands)

    2005-05-15

    Numerical models of transmission-constrained electricity markets are used to inform regulatory decisions. How robust are their results? Three research groups used the same data set for the northwest Europe power market as input for their models. Under competitive conditions, the results coincide, but in the Cournot case, the predicted prices differed significantly. The Cournot equilibria are highly sensitive to assumptions about market design (whether timing of generation and transmission decisions is sequential or integrated) and expectations of generators regarding how their decisions affect transmission prices and fringe generation. These sensitivities are qualitatively similar to those predicted by a simple two-node model.

  5. Market power and storage in electricity markets

    International Nuclear Information System (INIS)

    Skaar, Jostein

    2004-05-01

    Market power in liberalised electricity markets dominated by hydropower is analyzed in four chapters. The existing literature on competition in hydropower markets is briefly presented and examined. Chapter 1 discusses the effects of market power in the context of acquisitions in a situation where transmission capacity is constrained. Chapter 2 and 3 elaborate on the issue of competition and market power when water inflow is uncertain, and finally Chapter 4 focuses on the supply function equilibrium model in the context of a hydropower market

  6. Resource-Constrained Low-Complexity Video Coding for Wireless Transmission

    DEFF Research Database (Denmark)

    Ukhanova, Ann

    of video quality. We proposed a new metric for objective quality assessment that considers frame rate. As many applications deal with wireless video transmission, we performed an analysis of compression and transmission systems with a focus on power-distortion trade-off. We proposed an approach...... for ratedistortion-complexity optimization of upcoming video compression standard HEVC. We also provided a new method allowing decrease of power consumption on mobile devices in 3G networks. Finally, we proposed low-delay and low-power approaches for video transmission over wireless personal area networks, including......Constrained resources like memory, power, bandwidth and delay requirements in many mobile systems pose limitations for video applications. Standard approaches for video compression and transmission do not always satisfy system requirements. In this thesis we have shown that it is possible to modify...

  7. Medium-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  8. Improvement of the electric power sector through the access to the national power transmission system - SINTREL (Brazilian National System of Electric Power Transmission); Aperfeicoamento do setor de energia eletrica atraves do acesso a transmissao - SINTREL (Sistema Nacional de Transmissao de Energia Eletrica)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    This report presents the organization and the operation of SINTREL (Brazilian National System of Electric Power Transmission), the national power transmission system, and it defines its function in the process of reform of the Brazilian electric sector. Besides showing the traditional organization of the companies and of the electric system, and the evolution of the organization of the Brazilian electric system to favor the competition.

  9. ELECTRODYNAMICS OF TRANSMISSION AND LOSSES OF POWER IN THE DEVICES OF ELECTRIC TRACTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2014-01-01

    Full Text Available Purpose. Theoretical justification of the "field" approach (based on electromagnetic field to the transmission and losses of power in the devices of traction power supply systems and electric rolling stock. Methodology. The methods of electromagnetic field theory and, in particular, the theory and practice of electromagnetic energy transmission based on the concept of the Poynting vector and elements of the theory of propagation, reflection and refraction of plane electromagnetic waves were used. Findings. Theoretical studies of electromagnetic energy transmission from the traction substation to the electric rolling stock through dielectric (air surrounding traction network: between the contact wire and the rail were carried out. It is proposed strategic designing "squat" (low types of electric rolling stock. The components of electric energy flow through the roof of electric rolling stock and its frontal part of the body were estimated. This allows reliable etimating active power losses in electric traction system. To compensate the reactive power consumed by electric rolling stock, which is conditioned by standing waves, it is proposed (for extinction of the the last to develop and put in front of electric rolling stock the layer of particular environment with the necessary parameters. Originality. The "field" principle of the power transmission analysis and its losses arising in electric traction system was first proposed. The laws of motion of electromagnetic energy flows through the roof and the frontal part of the body of electric rolling stock were established. Practical value. An expression of the absolute value of the Poynting vector in the points of dielectric (air between the contact wire and the rail was obtained. This allows assessing the highest density of energy, which is transferred to the time unit and predicting the main dimensions of the unit of electric rolling stock. The energy indices of the roof of electric rolling stock

  10. Network-constrained Cournot models of liberalized electricity markets: the devil is in the details

    Energy Technology Data Exchange (ETDEWEB)

    Neuhoff, Karsten [Cambridge Univ., Dept. of Applied Economics, Cambridge (United Kingdom); Barquin, Julian; Vazquez, Miguel [Universidad Pontificia Comillas, Inst. de Investigacion Tecnologica, Madrid (Spain); Boots, Maroeska; Rijkers, Fieke A.M. [Energy Research Centre of the Netherlands ECN, Amsterdam (Netherlands); Ehrenmann, Andreas [Cambridge Univ., Judge Inst. of Management, Cambridge (United Kingdom); Hobbs, Benjamin F. [Johns Hopkins Univ., Dept. of Geography and Environmental Engineering, Baltimore, MD (United States)

    2005-05-01

    Numerical models of transmission-constrained electricity markets are used to inform regulatory decisions. How robust are their results? Three research groups used the same data set for the northwest Europe power market as input for their models. Under competitive conditions, the results coincide, but in the Cournot case, the predicted prices differed significantly. The Cournot equilibria are highly sensitive to assumptions about market design (whether timing of generation and transmission decisions is sequential or integrated) and expectations of generators regarding how their decisions affect transmission prices and fringe generation. These sensitivities are qualitatively similar to those predicted by a simple two-node model. (Author)

  11. Network-constrained Cournot models of liberalized electricity markets: the devil is in the details

    International Nuclear Information System (INIS)

    Neuhoff, Karsten; Barquin, Julian; Vazquez, Miguel; Boots, Maroeska; Rijkers, Fieke A.M.; Ehrenmann, Andreas; Hobbs, Benjamin F.

    2005-01-01

    Numerical models of transmission-constrained electricity markets are used to inform regulatory decisions. How robust are their results? Three research groups used the same data set for the northwest Europe power market as input for their models. Under competitive conditions, the results coincide, but in the Cournot case, the predicted prices differed significantly. The Cournot equilibria are highly sensitive to assumptions about market design (whether timing of generation and transmission decisions is sequential or integrated) and expectations of generators regarding how their decisions affect transmission prices and fringe generation. These sensitivities are qualitatively similar to those predicted by a simple two-node model. (Author)

  12. Consumption, price asymmetries, transmission congestion and market power in the Norwegian electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Mirza, Faisal Mehmood

    2011-07-01

    The results from this dissertation add to the ongoing debate in Norway if NordPool spot should shift from zonal price scheme to the nodal price scheme. Academically, the individual papers provide a number of theoretical frameworks that are helpful in analyzing electricity markets around the world. The PhD dissertation investigates price determination process in the Norwegian electricity market and evaluates if the market works at perfectly competitive level or producers exercise market power to drive prices away from their marginal cost of production. Using aggregate hourly electricity supply and demand data, the empirical analysis carried out in this dissertation leads to the following conclusions. 1. Market power at the generation level is not a major problem for the Norwegian electricity market. On average, when we consider the events of binding transmission capacity as exogenous, the average markup in economic terms is small and has not exceeded one percent. 2. Producers can use the information on available transmission capacity between different price areas in Norway and restrict their output to induce transmission congestion in their price area to exercise market power. Average markup during such instances has remained high at 20 percent. 3. Transmission capacity in Norway is not being optimally utilized as import capacity remains at its lowest level during the hours when southern Norway is generally a net importer of electricity, when compared to the rest of the hours of the day. 4. A segment of electricity retailers in the Norwegian electricity market exercises its market power by controlling the pass-through of price changes in the wholesale market to the retail market for variable price contract consumers. The pass-through is asymmetric, whereby cost increase is transmitted completely and quickly when compared to the case of cost decrease. 5.The Daylight saving time (Summer time) policy is helpful in ensuring energy efficiency. It results in electricity

  13. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    The proximity effects of high voltage electric power transmission lines on Leyland Cypress (xCupressocyparis leylandii (Dallim. and A.B. Jacks.) Dallim) and Japanese Privet (Ligustrum japonicum Thunb.) growth were examined in a private nursery located in Sakarya, Turkey. Five transect were randomly chosen in both ...

  14. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  15. Economy of electric power transmission

    International Nuclear Information System (INIS)

    Manzoni, G.; Delfanti, M.

    2008-01-01

    An analysis is presented of the impact of H V and Ehv transmission costs on the final value of the kWh supplied, with reference both to transmission systems of the European type and to long distance point-to-point transmission links. The analysis is extended to A C transmission by underground cables and to Hvdc submarine and aerial links. In the European power system, the impact of transmission costs results to be usually modest, but it may become important in the case of network congestions [it

  16. Electricity market equilibrium model with resource constraint and transmission congestion

    Energy Technology Data Exchange (ETDEWEB)

    Gao, F. [ABB, Inc., Santa Clara, CA 95050 (United States); Sheble, G.B. [Portland State University, Portland, OR 97207 (United States)

    2010-01-15

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  17. Electricity market equilibrium model with resource constraint and transmission congestion

    International Nuclear Information System (INIS)

    Gao, F.; Sheble, G.B.

    2010-01-01

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  18. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  19. Advanced Computational Methods for Security Constrained Financial Transmission Rights: Structure and Parallelism

    Energy Technology Data Exchange (ETDEWEB)

    Elbert, Stephen T.; Kalsi, Karanjit; Vlachopoulou, Maria; Rice, Mark J.; Glaesemann, Kurt R.; Zhou, Ning

    2012-07-26

    Financial Transmission Rights (FTRs) help power market participants reduce price risks associated with transmission congestion. FTRs are issued based on a process of solving a constrained optimization problem with the objective to maximize the FTR social welfare under power flow security constraints. Security constraints for different FTR categories (monthly, seasonal or annual) are usually coupled and the number of constraints increases exponentially with the number of categories. Commercial software for FTR calculation can only provide limited categories of FTRs due to the inherent computational challenges mentioned above. In this paper, a novel non-linear dynamical system (NDS) approach is proposed to solve the optimization problem. The new formulation and performance of the NDS solver is benchmarked against widely used linear programming (LP) solvers like CPLEX™ and tested on large-scale systems using data from the Western Electricity Coordinating Council (WECC). The NDS is demonstrated to outperform the widely used CPLEX algorithms while exhibiting superior scalability. Furthermore, the NDS based solver can be easily parallelized which results in significant computational improvement.

  20. An inexact multistage fuzzy-stochastic programming for regional electric power system management constrained by environmental quality.

    Science.gov (United States)

    Fu, Zhenghui; Wang, Han; Lu, Wentao; Guo, Huaicheng; Li, Wei

    2017-12-01

    Electric power system involves different fields and disciplines which addressed the economic system, energy system, and environment system. Inner uncertainty of this compound system would be an inevitable problem. Therefore, an inexact multistage fuzzy-stochastic programming (IMFSP) was developed for regional electric power system management constrained by environmental quality. A model which concluded interval-parameter programming, multistage stochastic programming, and fuzzy probability distribution was built to reflect the uncertain information and dynamic variation in the case study, and the scenarios under different credibility degrees were considered. For all scenarios under consideration, corrective actions were allowed to be taken dynamically in accordance with the pre-regulated policies and the uncertainties in reality. The results suggest that the methodology is applicable to handle the uncertainty of regional electric power management systems and help the decision makers to establish an effective development plan.

  1. Single-Wire Electric-Field Coupling Power Transmission Using Nonlinear Parity-Time-Symmetric Model with Coupled-Mode Theory

    Directory of Open Access Journals (Sweden)

    Xujian Shu

    2018-03-01

    Full Text Available The output power and transmission efficiency of the traditional single-wire electric-field coupling power transmission (ECPT system will drop sharply with the increase of the distance between transmitter and receiver, thus, in order to solve the above problem, in this paper, a new nonlinear parity-time (PT-symmetric model for single-wire ECPT system based on coupled-mode theory (CMT is proposed. The proposed model for single-wire ECPT system not only achieves constant output power but also obtains a high constant transmission efficiency against variable distance, and the steady-state characteristics of the single-wire ECPT system are analyzed. Based on the theoretical analysis and circuit simulation, it shows that the transmission efficiency with constant output power remains 60% over a transmission distance of approximately 34 m without the need for any tuning. Furthermore, the application of a nonlinear PT-symmetric circuit based on CMT enables robust electric power transfer to moving devices or vehicles.

  2. Voltage control in the future power transmission systems

    DEFF Research Database (Denmark)

    Qin, Nan

    Wind energy in Denmark covers 42% of the total power consumption in 2015, and will share up to 50% by 2020. Consequently, the conventional power plants are decommissioning. Under the progress of the green transition, the national decision leads to underground many overhead lines in the future...... stages. The voltage uncertainty caused by the wind power forecasting errors is estimated, which is applied as a voltage security margin to further constrain the voltage magnitude in the optimization problem. The problem under the uncertainty is therefore converted to a deterministic problem, which...... to ensure a highly reliable transmission, e.g. balancing the generation and the consumption in large geographic regions, the exchange capacities will be enlarged by upgrading the interconnections. The Danish power system, the electricity transportation hub between the Nordic and continental European systems...

  3. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  4. Electrical Structure of Future Off-shore Wind Power Plant with a High Voltage Direct Current Power Transmission

    DEFF Research Database (Denmark)

    Sharma, Ranjan

    The increasing demand of electric power and the growing consciousness towards the changing climate has led to a rapid development of renewable energy in the recent years. Among all, wind energy has been the fastest growing energy source in the last decade. But the growing size of wind power plants......, better wind conditions at off-shore and the general demand to put them out of sight have all contributed to the installation of large wind power plants in off-shore condition. However, moving wind power plants far out in the off-shore comes with many associated problems. One of the main challenges...... is the transmission of power over long distance. Historically, the power transmission from off-shore wind power plants has been done via HVAC submarine cables. This provides a simple solution, but AC cables cannot be arbitrarily long. It is shown in the report that major issues with HVAC cable transmission system...

  5. Price-based optimal control of power flow in electrical energy transmission networks

    NARCIS (Netherlands)

    Jokic, A.; Lazar, M.; Bosch, van den P.P.J.; Bemporad, A.; Bicchi, A.; Buttazzo, G.

    2007-01-01

    This article presents a novel control scheme for achieving optimal power balancing and congestion control in electrical energy transmission networks via nodal prices. We develop an explicit controller that guarantees economically optimal steady-state operation while respecting all line flow

  6. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions

  7. Operational electricity transmission rates

    International Nuclear Information System (INIS)

    Roggen, M.

    1997-01-01

    In a liberalized electricity market both the consumers and the producers of electricity must pay for the use of the power transmission network. Thus, the net manager has unlimited options to realize efficiency improvements. A neutral and transparent management of the power grid is necessary to avoid disturbance of the market. KEMA Consulting translated abstract ideas and strategic advices to operational concepts in its report 'A framework for the determination of tariffs of the transport in the Dutch electricity sector'

  8. Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion

    Science.gov (United States)

    Lizcano, Maricela

    2017-01-01

    High voltage hybrid electric propulsion systems are now pushing new technology development efforts for air transportation. A key challenge in hybrid electric aircraft is safe high voltage distribution and transmission of megawatts of power (>20 MW). For the past two years, a multidisciplinary materials research team at NASA Glenn Research Center has investigated the feasibility of distributing high voltage power on future hybrid electric aircraft. This presentation describes the team's approach to addressing this challenge, significant technical findings, and next steps in GRC's materials research effort for MW power distribution on aircraft.

  9. Calculation and application of energy transaction allocation factors in electric power transmission systems

    Science.gov (United States)

    Fradi, Aniss

    The ability to allocate the active power (MW) loading on transmission lines and transformers, is the basis of the "flow based" transmission allocation system developed by the North American Electric Reliability Council. In such a system, the active power flows must be allocated to each line or transformer in proportion to the active power being transmitted by each transaction imposed on the system. Currently, this is accomplished through the use of the linear Power Transfer Distribution Factors (PTDFs). Unfortunately, no linear allocation models exist for other energy transmission quantities, such as MW and MVAR losses, MVAR and MVA flows, etc. Early allocation schemes were developed to allocate MW losses due to transactions to branches in a transmission system, however they exhibited diminished accuracy, since most of them are based on linear power flow modeling of the transmission system. This thesis presents a new methodology to calculate Energy Transaction Allocation factors (ETA factors, or eta factors), using the well-known process of integration of a first derivative function, as well as consistent and well-established mathematical and AC power flow models. The factors give a highly accurate allocation of any non-linear system quantity to transactions placed on the transmission system. The thesis also extends the new ETA factors calculation procedure to restructure a new economic dispatch scheme where multiple sets of generators are economically dispatched to meet their corresponding load and their share of the losses.

  10. Electrodynamic Wireless Power Transmission to Rotating Magnet Receivers

    International Nuclear Information System (INIS)

    Garraud, A; Jimenez, J D; Garraud, N; Arnold, D P

    2014-01-01

    This paper presents an approach for electrodynamic wireless power transmission (EWPT) using a synchronously rotating magnet located in a 3.2 cm 3 receiver. We demonstrate wireless power transmission up to 99 mW (power density equal to 31 mW/cm 3 ) over a 5-cm distance and 5 mW over a 20-cm distance. The maximum operational frequency, and hence maximal output power, is constrained by the magnetic field amplitude. A quadratic relationship is found between the maximal output power and the magnetic field. We also demonstrate simultaneous, power transmission to multiple receivers positioned at different locations

  11. 1KW Power Transmission Using Wireless Acoustic-Electric Feed-Through (WAEF)

    Science.gov (United States)

    Sherrit, S.; Bao, X.; Badescu, M.; Aldrich, J.; Bar-Cohen, Y.; Biederman, W.

    2008-01-01

    A variety of space applications require the delivery of power into sealed structures. Since the structural integrity can be degraded by holes for cabling we present an alternative method of delivering power and information using stress waves to the internal space of a sealed structure. One particular application of this technology is in sample return missions where it is critical to preserve the sample integrity and to prevent earth contamination. Therefore, the container has to be hermetically sealed and the integrity of the seal must be monitored in order to insure to a high degree of reliability the integrity of the sample return vessel. In this study we investigated the use of piezoelectric acoustic-electric power feed-through devices to transfer electric power wirelessly through a solid wall by using elastic or acoustic waves. The technology is applicable to a range of space and terrestrial applications where power is required by electronic equipment inside sealed containers, vacuum or pressure vessels, etc., where holes in the wall are prohibitive or may result in significant structural performance degradation or unnecessarily complex designs. To meet requirements of higher power applications, the feasibility to transfer kilowatts level power was investigated. Pre-stressed longitudinal piezoelectric feed-through devices were analyzed by finite element models and an equivalent circuit model was developed to predict the power transfer characteristics to different electric loads. Based on the results of the analysis a prototype device was designed, fabricated and a demonstration of the transmission of electric power up to 1.068-kW was successfully conducted. Efficiencies in the 80-90% range were also demonstrated and methods to increase the efficiency further are currently being considered.

  12. Essays on electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Rud, Linda

    2009-07-01

    The report covers several topics of electricity markets: The first essay, 'Selected Topics on Early Electricity Market Design in Norway' studies market design issues in establishing the market-based Norwegian electricity market. Essays 2-4 focus on issues of network congestion: 'Capacity Charges: A Price Adjustment Process for Managing Congestion in Electricity Transmission Networks' presents the capacity charge approach for managing transmission constraints in electricity networks. 'Understanding the Stochastics of Nodal Prices: Price Processes in a Constrained Network' seeks a further understanding of stochastic nodal prices processes. 'Investment Evaluation in a Constrained Electricity Network with Stochastic Nodal Price Processes' studies how the interaction of the competitive market and the capacitated network affects the evaluation of investments under uncertainty, and points out potential pitfalls of evaluation. In the last essay, 'A Newsboy Model Perspective on the Power Market: The Case of a Wind Power Producer' we discuss aspects of optimal bidding for a wind power producer. (Author)

  13. Essays on electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Rud, Linda

    2009-07-01

    The report covers several topics of electricity markets: The first essay, 'Selected Topics on Early Electricity Market Design in Norway' studies market design issues in establishing the market-based Norwegian electricity market. Essays 2-4 focus on issues of network congestion: 'Capacity Charges: A Price Adjustment Process for Managing Congestion in Electricity Transmission Networks' presents the capacity charge approach for managing transmission constraints in electricity networks. 'Understanding the Stochastics of Nodal Prices: Price Processes in a Constrained Network' seeks a further understanding of stochastic nodal prices processes. 'Investment Evaluation in a Constrained Electricity Network with Stochastic Nodal Price Processes' studies how the interaction of the competitive market and the capacitated network affects the evaluation of investments under uncertainty, and points out potential pitfalls of evaluation. In the last essay, 'A Newsboy Model Perspective on the Power Market: The Case of a Wind Power Producer' we discuss aspects of optimal bidding for a wind power producer. (Author)

  14. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

    Energy Technology Data Exchange (ETDEWEB)

    Werley, Kenneth Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mccown, Andrew William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)ory

    2016-06-26

    The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.

  15. Fast Lagrangian relaxation for constrained generation scheduling in a centralized electricity market

    International Nuclear Information System (INIS)

    Ongsakul, Weerakorn; Petcharaks, Nit

    2008-01-01

    This paper proposes a fast Lagrangian relaxation (FLR) for constrained generation scheduling (CGS) problem in a centralized electricity market. FLR minimizes the consumer payment rather than the total supply cost subject to the power balance, spinning reserve, transmission line, and generator operating constraints. FLR algorithm is improved by new initialization of Lagrangian multipliers and adaptive adjustment of Lagrangian multipliers. The adaptive subgradient method using high quality initial feasible multipliers requires much less number of iterations to converge, leading to a faster computational time. If congestion exists, the alleviating congestion index is proposed for congestion management. Finally, the unit decommitment is performed to prevent excessive spinning reserve. The FLR for CGS is tested on the 4 unit and the IEEE 24 bus reliability test systems. The proposed uniform electricity price results in a lower consumer payment than system marginal price based on uniformly fixed cost amortized allocation, non-uniform price, and electricity price incorporating side payment, leading to a lower electricity price. In addition, observations on objective functions, pricing scheme comparison and interpretation of Lagrangian multipliers are provided. (author)

  16. Wind power development in the United States: Effects of policies and electricity transmission congestion

    Science.gov (United States)

    Hitaj, Claudia

    In this dissertation, I analyze the drivers of wind power development in the United States as well as the relationship between renewable power plant location and transmission congestion and emissions levels. I first examine the role of government renewable energy incentives and access to the electricity grid on investment in wind power plants across counties from 1998-2007. The results indicate that the federal production tax credit, state-level sales tax credit and production incentives play an important role in promoting wind power. In addition, higher wind power penetration levels can be achieved by bringing more parts of the electricity transmission grid under independent system operator regulation. I conclude that state and federal government policies play a significant role in wind power development both by providing financial support and by improving physical and procedural access to the electricity grid. Second, I examine the effect of renewable power plant location on electricity transmission congestion levels and system-wide emissions levels in a theoretical model and a simulation study. A new renewable plant takes the effect of congestion on its own output into account, but ignores the effect of its marginal contribution to congestion on output from existing plants, which results in curtailment of renewable power. Though pricing congestion removes the externality and reduces curtailment, I find that in the absence of a price on emissions, pricing congestion may in some cases actually increase system-wide emissions. The final part of my dissertation deals with an econometric issue that emerged from the empirical analysis of the drivers of wind power. I study the effect of the degree of censoring on random-effects Tobit estimates in finite sample with a particular focus on severe censoring, when the percentage of uncensored observations reaches 1 to 5 percent. The results show that the Tobit model performs well even at 5 percent uncensored observations

  17. Experimental results of wind powered pumping plant with electrical transmission

    International Nuclear Information System (INIS)

    Falchetta, M.; Prischich, D.; Benedetti, A.; Cara, G.

    1992-01-01

    A demonstrative application of deep well pumping system employing a wind powered pumping plant with an electric transmission was set-up and tested for two years at the test field of the Casaccia center of ENEA (Italian Agency for Energy, New Technologies and the Environment), near Rome. The tests permitted the evaluation of the practical performance, advantages and drawbacks of a wind pumping plant of this type, in order to permit a design optimization and a proper choice of components and of control strategies for future commercial applications. The main point of investigation was the evaluation of the effectiveness of a control scheme based on a 'permanent link' between electric generator and electric motor, avoiding any electronics and switching components, and leading to a very robust and reliable means of transferring energy to the pump at variable speed, and at low cost

  18. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    International Nuclear Information System (INIS)

    Lise, Wietze; Hobbs, Benjamin F.; Hers, Sebastiaan

    2008-01-01

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  19. Market power in the European electricity market-The impacts of dry weather and additional transmission capacity

    Energy Technology Data Exchange (ETDEWEB)

    Lise, Wietze [IBS Research and Consultancy, Agahamami Cadessi 1/6, Aga Han, Cihangir, 34433 Beyoglu, Istanbul (Turkey); Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)], E-mail: wietze.lise@ibsresearch.com; Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Hers, Sebastiaan [Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)

    2008-04-15

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness.

  20. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    Energy Technology Data Exchange (ETDEWEB)

    Lise, Wietze [IBS Research and Consultancy, Agahamami Cadessi 1/6, Aga Han, Cihangir, 34433 Beyoglu, Istanbul (Turkey); Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands); Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Hers, Sebastiaan [Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)

    2008-04-15

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  1. Shifting and power sharing control of a novel dual input clutchless transmission for electric vehicles

    Science.gov (United States)

    Liang, Jiejunyi; Yang, Haitao; Wu, Jinglai; Zhang, Nong; Walker, Paul D.

    2018-05-01

    To improve the overall efficiency of electric vehicles and guarantee the driving comfort and vehicle drivability under the concept of simplifying mechanism complexity and minimizing manufacturing cost, this paper proposes a novel clutchless power-shifting transmission system with shifting control strategy and power sharing control strategy. The proposed shifting strategy takes advantage of the transmission architecture to achieve power-on shifting, which greatly improves the driving comfort compared with conventional automated manual transmission, with a bump function based shifting control method. To maximize the overall efficiency, a real-time power sharing control strategy is designed to solve the power distribution problem between the two motors. Detailed mathematical model is built to verify the effectiveness of the proposed methods. The results demonstrate the proposed strategies considerably improve the overall efficiency while achieve non-interrupted power-on shifting and maintain the vehicle jerk during shifting under an acceptable threshold.

  2. The significance of interconnector counter-trading in a security constrained electricity market

    International Nuclear Information System (INIS)

    Higgins, P.; Li, K.; Devlin, J.; Foley, A.M.

    2015-01-01

    Throughout the European Union there is an increasing amount of wind generation being dispatched-down due to the binding of power system operating constraints from high levels of wind generation. This paper examines the impact a system non-synchronous penetration limit has on the dispatch-down of wind and quantifies the significance of interconnector counter-trading to the priority dispatching of wind power. A fully coupled economic dispatch and security constrained unit commitment model of the Single Electricity Market of the Republic of Ireland and Northern Ireland and the British Electricity Trading and Transmission Arrangement was used in this study. The key finding was interconnector counter-trading reduces the impact the system non-synchronous penetration limit has on the dispatch-down of wind. The capability to counter-trade on the interconnectors and an increase in system non-synchronous penetration limit from 50% to 55% reduces the dispatch-down of wind by 311 GW h and decreases total electricity payments to the consumer by €1.72/MW h. In terms of the European Union electricity market integration, the results show the importance of developing individual electricity markets that allow system operators to counter-trade on interconnectors to ensure the priority dispatch of the increasing levels of wind generation. - Highlights: • Interconnector counter-trading reduces the system marginal price in the SEM. • Dispatch-down of wind power is reduced due to interconnector counter-trading. • A 5% increase in the SNSP limit can reduce wind power dispatched-down by 50%. • An increase in the SNSP limit and installed wind capacity reduces the SMP.

  3. Electrical transmission

    Energy Technology Data Exchange (ETDEWEB)

    Sayers, D P

    1960-05-01

    After briefly tracing the history of electricity transmission, trends in high voltage transmission and experiments being conducted on 650 kV are discussed. 5000 miles of the U.K. grid are operated at 132 kV and 1000 at 275 kV, ultimately to provide a super grid at 380 kV. Problems are insulation, radio interference and the cost of underground lines (16 times that of overhead lines). Also considered are the economics of the grid as a means of transporting energy and as a means of spreading the peak load over the power stations in the most efficient manner. Finally, the question of amenities is discussed.

  4. Line Capacity Expansion and Transmission Switching in Power Systems With Large-Scale Wind Power

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer; Bronmo, Geir; Philpott, Andy B.

    2013-01-01

    In 2020 electricity production from wind power should constitute nearly 50% of electricity demand in Denmark. In this paper we look at optimal expansion of the transmission network in order to integrate 50% wind power in the system, while minimizing total fixed investment cost and expected cost...... of power generation. We allow for active switching of transmission elements to reduce congestion effects caused by Kirchhoff's voltage law. Results show that actively switching transmission lines may yield a better utilization of transmission networks with large-scale wind power and increase wind power...

  5. Unforeseen consequences of dedicated renewable energy transmission: Potential implications for renewable electricity development

    Energy Technology Data Exchange (ETDEWEB)

    Bezdek, Roger

    2010-09-15

    Renewable electricity generation requires expansion of electricity transmission, and the U.S. is planning to build a 'green' transmission lines restricted to renewable electricity. However, local jurisdictions are resisting this unless the transmission serves local constituents and existing power plants. This paper finds that if such transmission is built and local access allowed, then the major beneficiaries may be existing power plants. Their access to added transmission could enable them to sell electric power at rates against which renewables cannot compete. These issues must be addressed if large additions of new transmission lines are to facilitate expansion of renewable electricity generation worldwide.

  6. Investment in Electricity Transmission and Ancillary Environmental Benefits

    OpenAIRE

    Burtraw, Dallas; Bharvirkar, Ranjit; Bloyd, Cary

    2002-01-01

    Planning of the electricity transmission system generally focuses on the pros and cons of providing generation close to the source of the power demand versus remote generation linked via the transmission system. Recent electricity supply problems in the western United States have renewed interest in the role of transmission in assuring the reliability of electricity supply. Recently, the Western Governors’ Association led the development of a planning exercise that examined the tradeoffs over...

  7. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  8. Transmission : roadway to a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink L.P., AB (Canada)

    2002-07-01

    Having a variety of suppliers, marketers and retailers is the key to developing a successful electricity market which is more competitive on pricing, with less price volatility, more innovative customer products and higher levels of customer services. Some areas of Alberta are developing their own power markets with limited capacity to interact. These include Pincher Creek, Empress, Calgary, Edmonton, and Fort McMurray. It was noted that increasing transmission capacity is the key to ensuring a bigger and more competitive electricity market. Transmission constraints only encourage a small number of suppliers to control the market. The current cost of transmission capacity accounts for less than 5 per cent of an average residential customer's bill, but it plays a major role in providing more choice to competitive electricity suppliers. Developing more transmission capacity will create an even more competitive market that benefits both consumers and suppliers. Prices in Alberta have been very volatile in the past couple of years because of supply and demand issues, and there is a need to increase market liquidity. Alberta's Transmission Administrator is looking to expand the transmission network to alleviate constraints and to lower the cost of power generation, regardless of location. These expansions are not expected to affect customers' bills by more than 2 to 3 per cent. Such transmission concerns are being felt all over North America. The Federal Energy Regulatory Commission (FERC) in the United States also recognizes the link between transmission and creating a competitive electricity market.

  9. New South Wales' new electricity transmission authority

    International Nuclear Information System (INIS)

    Fahey, J.

    1995-01-01

    The latest milestone in electricity reform in NSW was the formation of a new statutory authority, the Electricity Transmission Authority (ETA), to take over and operate the transmission assets of Pacific Power, formerly the New South Wales Electricity Commission. The ETA will be operational from 1 February 1995, in time for the proposed commencement of a national electricity market on 1 July 1995. The forces of competition are being used to improve the efficiency of the industry, to empower consumers with greater choice and to open up new opportunities for private-sector participation in the industry. Potentially commercial activities such as coal mines have been separated from the operational arm of Pacific Power so that they have to compete with the private sector in supplying power stations. Significant reductions have been made in the price of electricity to reduce existing cross-subsidizations so that commercial and industrial customers gain the biggest benefits. The new ETA will pay dividends to the NSW government, as private companies pay dividends to their shareholders, and it will be subject to the federal tax-equivalent regime. 2 photos

  10. Electric vehicle charging to support renewable energy integration in a capacity constrained electricity grid

    International Nuclear Information System (INIS)

    Pearre, Nathaniel S.; Swan, Lukas G.

    2016-01-01

    Highlights: • Examination of EV charging in a wind rich area with transmission constraints. • Multiple survey instruments to determine transportation needs, when charging occurs. • Simple charging, time-of-day scheduled, and ideal smart charging investigated. • Export power peaks reduced by 2% with TOD, 10% with smart charging 10% of fleet. • Smart charging EVs enables enough added wind capacity to power the fleet. - Abstract: Digby, Nova Scotia, is a largely rural area with a wealth of renewable energy resources, principally wind and tidal. Digby’s electrical load is serviced by an aging 69 kV transmission line that often operates at the export capacity limit because of a local wind energy converter (WEC) field. This study examines the potential of smart charging of electric vehicles (EVs) to achieve two objectives: (1) add load so as to increase export capacity; (2) charge EVs using renewable energy. Multiple survey instruments were used to determine transportation energy needs and travel timing. These were used to create EV charging load timeseries based on “convenience”, “time-of-day”, and idealized “smart” charging. These charging scenarios were evaluated in combination with high resolution data of generation at the wind field, electrical flow through the transmission system, and electricity load. With a 10% adoption rate of EVs, time-of-day charging increased local renewable energy usage by 20% and enables marginal WEC upgrading. Smart charging increases charging by local renewable energy by 73%. More significantly, it adds 3 MW of load when power exports face constraints, allowing enough additional renewable electricity generation capacity to fully power those vehicles.

  11. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  12. Hydropower generation and storage, transmission constraints and market power

    International Nuclear Information System (INIS)

    Johnsen, T.A.

    2001-01-01

    We study hydropower generation and storage in the presence of uncertainty about future inflows, market power and limited transmission capacity to neighboring regions. Within our simple two-period model, market power leads to too little storage. The monopolist finds it profitable to produce more than the competitive amount in the first period and thereby stores little water in the first of two periods in order to become import constrained in the second period. In addition, little storage reduces the probability of becoming export constrained in the second period, even if the second period exhibits large inflow. Empirical findings for an area in the western part of Norway with only hydropower and high ownership concentration at the supply side, fit well to our theoretical model. We apply a numerical model to examine various policies to reduce the inefficiencies created by the local monopoly. Transmission investments have two effects. First, the export possibilities in the first period increase. More export leads to lower storage in the first period. Second, larger import capacity reduces the market power problem in the second period. The two opposite effects of transmission investments in a case with market power may be unique to hydropower systems. Introducing financial transmission rights enhance the market power of the monopolist in our model. Price caps in both or in the second period only, reduce the strategic value of water storage. (Author)

  13. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  14. Electricity transmission and distribution in Ontario : a look ahead

    International Nuclear Information System (INIS)

    2004-01-01

    This paper addressed changes and challenges that can guide the Ontario government in developing a policy framework for sustainable development in the electric power industry, particularly the power distribution and transmission sector. The government is taking action to adopt a balanced approach to energy policy that combines features of both regulated and competitive industries. It is taking a more responsible approach to electricity pricing that ends subsidies in order to reflect the true cost of electricity. The major issues facing the wires sector are: improving efficiencies by consolidating activities, streamlining operations and unbundling power transmission and distribution into separate entities; developing distributed generation; and, investing in new transmission to relieve congestion. It was noted that distributed generation will become more important as coal-fired generation facilities are replaced. Distributed generation offers many benefits for the wires sector, including delaying the need to upgrade the existing wires network, offering local solutions to transmission constraints, reducing system losses, improving load factor and improving the reliability of supply. An increase in distributed generation will likely mean that more of Ontario's electricity supply will come from small-scale renewable generation facilities. The government promotes private sector investment to assist in the rebuilding of the electricity sector

  15. Eco-design of power transmissions systems

    International Nuclear Information System (INIS)

    Wang, W.

    2011-01-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in Transmission and Distribution (T and D) industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, the study 'Eco-design of Power Transmission Systems' is conducted in this thesis, with the purpose of analysing the transmission systems' environmental impacts, locating the major environmental burden sources of transmission systems, selecting and/or developing methodologies of reducing its environmental impacts. (author)

  16. Calculation of Voltages in Electric Power Transmission Lines During Historic Geomagnetic Storms: An Investigation Using Realistic Earth Impedances

    Science.gov (United States)

    Lucas, Greg M.; Love, Jeffrey J.; Kelbert, Anna

    2018-02-01

    Commonly, one-dimensional (1-D) Earth impedances have been used to calculate the voltages induced across electric power transmission lines during geomagnetic storms under the assumption that much of the three-dimensional structure of the Earth gets smoothed when integrating along power transmission lines. We calculate the voltage across power transmission lines in the mid-Atlantic region with both regional 1-D impedances and 64 empirical 3-D impedances obtained from a magnetotelluric survey. The use of 3-D impedances produces substantially more spatial variance in the calculated voltages, with the voltages being more than an order of magnitude different, both higher and lower, than the voltages calculated utilizing regional 1-D impedances. During the March 1989 geomagnetic storm 62 transmission lines exceed 100 V when utilizing empirical 3-D impedances, whereas 16 transmission lines exceed 100 V when utilizing regional 1-D impedances. This demonstrates the importance of using realistic impedances to understand and quantify the impact that a geomagnetic storm has on power grids.

  17. Design of synchromesh mechanism to optimization manual transmission's electric vehicle

    Science.gov (United States)

    Zainuri, Fuad; Sumarsono, Danardono A.; Adhitya, Muhammad; Siregar, Rolan

    2017-03-01

    Significant research has been attempted on a vehicle that lead to the development of transmission that can reduce energy consumption and improve vehicle efficiency. Consumers also expect safety, convenience, and competitive prices. Automatic transmission (AT), continuously variable transmission (CVT), and dual clutch transmission (DCT) is the latest transmission developed for road vehicle. From literature reviews that have been done that this transmission is less effective on electric cars which use batteries as a power source compared to type manual transmission, this is due to the large power losses when making gear changes. Zeroshift system is the transmission can do shift gears with no time (zero time). It was developed for the automatic manual transmission, and this transmission has been used on racing vehicles to eliminate deceleration when gear shift. Zeroshift transmission still use the clutch to change gear in which electromechanical be used to replace the clutch pedal. Therefore, the transmission is too complex for the transmission of electric vehicles, but its mechanism is considered very suitable to increase the transmission efficiency. From this idea, a new innovation design transmission will be created to electric car. The combination synchromesh with zeroshift mechanism for the manual transmission is a transmission that is ideal for improving the transmission efficiency. Installation synchromesh on zeroshift mechanism is expected to replace the function of the clutch MT, and assisted with the motor torque setting when to change gear. Additionally to consider is the weight of the transmission, ease of manufacturing, ease of installation with an electric motor, as well as ease of use by drivers is a matter that must be done to obtain a new transmission system that is suitable for electric cars.

  18. Transmission topologies for the integration of renewable power into the electricity systems of North Africa

    International Nuclear Information System (INIS)

    Brand, Bernhard

    2013-01-01

    A cost-minimizing electricity market model was used to explore optimized infrastructures for the integration of renewable energies in interconnected North African power systems until 2030. The results show that the five countries Morocco, Algeria, Tunisia, Libya and Egypt could together achieve significant economic benefits, reaching up to €3.4 billion, if they increase power system integration, build interconnectors and cooperate on joint utilization of their generation assets. Net electricity exports out of North Africa to Europe or Eastern Mediterranean regions, however, were not observed in the regime of integrated electricity markets until 2030, and could only be realized by much higher levels of renewable energy penetration than currently foreseen by North African governments. - Highlights: • Market model to optimize North Africa's generation and transmission infrastructures until 2030. • Simulations consider existing interconnectors, power plant inventories, as well as national renewable goals. • Savings of up to €3.4 billion can be realized by more cooperation and integrated system planning. • No electricity exports to Europe in a competitive market framework, except for very high renewable penetrations

  19. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2002-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid on 1 January 2002. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis. The prices for transmission services 1 January 2002 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 856 for flats, SEK 4,194 one- or two-family houses with electric heating and SEK 1,881 without electric heating. (1 SEK ∼ 0.1 USD). Electricity prices rose considerably on 1 January 2002 compared to the year before. The mean price per kWh for households according to standard agreement was SEK 0.356 for deliveries to flats, SEK 0.296 for apartments in one- or two-family houses with electric heating and SEK 0.316 without electric heating. That means that the mean annual cost increased by SEK 171 for flats. For one- or two-family houses with electric heating, costs increased by SEK 1,424, and by SEK 379 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by 75 per cent during 2001. The price development for household customers during 1996-2002 is shown in a diagram

  20. Fault detection and classification in electrical power transmission system using artificial neural network.

    Science.gov (United States)

    Jamil, Majid; Sharma, Sanjeev Kumar; Singh, Rajveer

    2015-01-01

    This paper focuses on the detection and classification of the faults on electrical power transmission line using artificial neural networks. The three phase currents and voltages of one end are taken as inputs in the proposed scheme. The feed forward neural network along with back propagation algorithm has been employed for detection and classification of the fault for analysis of each of the three phases involved in the process. A detailed analysis with varying number of hidden layers has been performed to validate the choice of the neural network. The simulation results concluded that the present method based on the neural network is efficient in detecting and classifying the faults on transmission lines with satisfactory performances. The different faults are simulated with different parameters to check the versatility of the method. The proposed method can be extended to the Distribution network of the Power System. The various simulations and analysis of signals is done in the MATLAB(®) environment.

  1. Calculation of voltages in electric power transmission lines during historic geomagnetic storms: An investigation using realistic earth impedances

    Science.gov (United States)

    Lucas, Greg M.; Love, Jeffrey J.; Kelbert, Anna

    2018-01-01

    Commonly, one-dimensional (1-D) Earth impedances have been used to calculate the voltages induced across electric power transmission lines during geomagnetic storms under the assumption that much of the three-dimensional structure of the Earth gets smoothed when integrating along power transmission lines. We calculate the voltage across power transmission lines in the mid-Atlantic region with both regional 1-D impedances and 64 empirical 3-D impedances obtained from a magnetotelluric survey. The use of 3-D impedances produces substantially more spatial variance in the calculated voltages, with the voltages being more than an order of magnitude different, both higher and lower, than the voltages calculated utilizing regional 1-D impedances. During the March 1989 geomagnetic storm 62 transmission lines exceed 100 V when utilizing empirical 3-D impedances, whereas 16 transmission lines exceed 100 V when utilizing regional 1-D impedances. This demonstrates the importance of using realistic impedances to understand and quantify the impact that a geomagnetic storm has on power grids.

  2. Network Theory Integrated Life Cycle Assessment for an Electric Power System

    Directory of Open Access Journals (Sweden)

    Heetae Kim

    2015-08-01

    Full Text Available In this study, we allocate Greenhouse gas (GHG emissions of electricity transmission to the consumers. As an allocation basis, we introduce energy distance. Energy distance takes the transmission load on the electricity energy system into account in addition to the amount of electricity consumption. As a case study, we estimate regional GHG emissions of electricity transmission loss in Chile. Life cycle assessment (LCA is used to estimate the total GHG emissions of the Chilean electric power system. The regional GHG emission of transmission loss is calculated from the total GHG emissions. We construct the network model of Chilean electric power grid as an undirected network with 466 nodes and 543 edges holding the topology of the power grid based on the statistical record. We analyze the total annual GHG emissions of the Chilean electricity energy system as 23.07 Mt CO2-eq. and 1.61 Mt CO2-eq. for the transmission loss, respectively. The total energy distance for the electricity transmission accounts for 12,842.10 TWh km based on network analysis. We argue that when the GHG emission of electricity transmission loss is estimated, the electricity transmission load should be separately considered. We propose network theory as a useful complement to LCA analysis for the complex allocation. Energy distance is especially useful on a very large-scale electric power grid such as an intercontinental transmission network.

  3. Wireless transmission of power

    International Nuclear Information System (INIS)

    Grotz, T.

    1991-01-01

    This paper reports that it has been proven by researchers that electrical energy can be propagated around the world between the surface of the Earth and the ionosphere at extremely low frequencies in what is known as the Schumann Cavity. Experiments to data have shown that electromagnetic waves with frequencies in the range of 8 Hz, the fundamental Schumann Resonance frequency, propagate with litter attenuation around the planet within the Schumann Cavity. It is the intent of this research to determine if the Schumann Cavity can be resonated, if the power that is delivered to the cavity propagated with very low losses, and if power can be extracted at other locations within the cavity. Experimental data collected and calculations made in recent years support the hypothesis that wireless power transmission is a viable and practical alternative to the present systems of power transmission

  4. Risk management in electricity markets emphasizing transmission congestion

    International Nuclear Information System (INIS)

    Kristiansen, Tarjei

    2004-01-01

    This thesis analyzes transmission pricing, transmission congestion risks and their associated hedging instruments as well as mechanisms for stimulating investments in transmission expansion. An example of risk management in the case of a hydropower producer is included. After liberalization and restructuring of electricity markets, risk management has become important. In particular the thesis analyzes risks due to transmission congestion both in the short- and long-term (investments) for market players such as generators, loads, traders, independent system operators and merchant investors. The work is focused on the northeastern United States electricity markets and the Nordic electricity markets. The first part of the thesis reviews the literature related to the eight research papers in the thesis. This describes the risks that are relevant for an electricity market player and how these can be managed. Next, the basic ingredients of a competitive electricity market are described including the design of the system operator. The transmission pricing method is decisive for hedging against transmission congestion risks and there is an overview of transmission pricing models considering their similarities and differences. Depending on the transmission pricing method used, locational or area (zonal) pricing, the electricity market players can use financial transmission rights or Contracts for Differences, respectively. In the long-term it is important to create mechanisms for investments in transmission expansion and the thesis describes one possible approach and its potential problems. The second part comprises eight research papers. It presents empirical analyses of existing markets for transmission congestion derivatives, theoretical analyses of transmission congestion derivatives, modeling of merchant long-term financial transmission rights, theoretical analysis of the risks of the independent system operator in providing financial transmission rights, an analysis

  5. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  6. Electrical-Loss Analysis of Power-Split Hybrid Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Andrea Bonfiglio

    2017-12-01

    Full Text Available The growing development of hybrid electric vehicles (HEVs has seen the spread of architectures with transmission based on planetary gear train, realized thanks to two electric machines. This architecture, by continuously regulating the transmission ratio, allows the internal combustion engine (ICE to work in optimal conditions. On the one hand, the average ICE efficiency is increased thanks to better loading situations, while, on the other hand, electrical losses are introduced due to the power circulation between the two electrical machines mentioned above. The aim of this study is then to accurately evaluate electrical losses and the average ICE efficiency in various operating conditions and over different road missions. The models used in this study are presented for both the Continuously Variable Transmission (CVT architecture and the Discontinuously Variable Transmission (DVT architecture. In addition, efficiency maps of the main components are shown. Finally, the simulation results are presented to point out strengths and weaknesses of the CVT architecture.

  7. Resilience of electricity grids against transmission line overloads under wind power injection at different nodes.

    Science.gov (United States)

    Schiel, Christoph; Lind, Pedro G; Maass, Philipp

    2017-09-14

    A steadily increasing fraction of renewable energy sources for electricity production requires a better understanding of how stochastic power generation affects the stability of electricity grids. Here, we assess the resilience of an IEEE test grid against single transmission line overloads under wind power injection based on the dc power flow equations and a quasi-static grid response to wind fluctuations. Thereby we focus on the mutual influence of wind power generation at different nodes. We find that overload probabilities vary strongly between different pairs of nodes and become highly affected by spatial correlations of wind fluctuations. An unexpected behaviour is uncovered: for a large number of node pairs, increasing wind power injection at one node can increase the power threshold at the other node with respect to line overloads in the grid. We find that this seemingly paradoxical behaviour is related to the topological distance of the overloaded line from the shortest path connecting the wind nodes. In the considered test grid, it occurs for all node pairs, where the overloaded line belongs to the shortest path.

  8. Incorporating Charging/Discharging Strategy of Electric Vehicles into Security-Constrained Optimal Power Flow to Support High Renewable Penetration

    Directory of Open Access Journals (Sweden)

    Kyungsung An

    2017-05-01

    Full Text Available This research aims to improve the operational efficiency and security of electric power systems at high renewable penetration by exploiting the envisioned controllability or flexibility of electric vehicles (EVs; EVs interact with the grid through grid-to-vehicle (G2V and vehicle-to-grid (V2G services to ensure reliable and cost-effective grid operation. This research provides a computational framework for this decision-making process. Charging and discharging strategies of EV aggregators are incorporated into a security-constrained optimal power flow (SCOPF problem such that overall energy cost is minimized and operation within acceptable reliability criteria is ensured. Particularly, this SCOPF problem has been formulated for Jeju Island in South Korea, in order to lower carbon emissions toward a zero-carbon island by, for example, integrating large-scale renewable energy and EVs. On top of conventional constraints on the generators and line flows, a unique constraint on the system inertia constant, interpreted as the minimum synchronous generation, is considered to ensure grid security at high renewable penetration. The available energy constraint of the participating EV associated with the state-of-charge (SOC of the battery and market price-responsive behavior of the EV aggregators are also explored. Case studies for the Jeju electric power system in 2030 under various operational scenarios demonstrate the effectiveness of the proposed method and improved operational flexibility via controllable EVs.

  9. THE MAIN DIRECTIONS OF IMPROVING THE EFFICIENCY OF PRODUCTION, TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY

    Directory of Open Access Journals (Sweden)

    I. V. Zhezhelenko

    2018-01-01

    Full Text Available The main directions of increase of efficiency of production, transmission and distribution of electric energy have been formulated. The relation between the values of electricity losses during transmission via power grids of different countries and the level of the economies of these countries characterized by the value of gross domestic product at purchasing power parity per capita has been established. In the countries with a gross domestic product at purchasing power parity per capita less than 20 thousand US dollars electricity losses during its transmission via power grids are 1.5–2.5 times more than the ones transmitted via power grids of the industrialized countries where the specified purchasing power parity is in the range of 30.4–54.5 thousand US dollars. In the countries with more developed economies the technical culture of production, transmission and distribution of electricity is higher; the modern control systems of operation modes of electrical networks are used as well as of monitoring and accounting of electricity; also there are solvent and disciplined consumers in such countries as well as clear regulatory framework and tariff regulation system. However, the process of transmission and distribution of electricity is effective if not only low relative losses take place, but the normal (contractual requirements for carrying capacity, quality and reliability of electricity supply are provided. The possibility of analytical determination of the optimum value of reserve capacity of power plants providing the required level of reliability of the power system has been considered.

  10. Swiss electrical power association

    International Nuclear Information System (INIS)

    1983-01-01

    Milestones of electrical power development in Switzerland during 1982 are quoted. An energy balance is shown for the utilisation of 864,630 terajoules of primary energy. This is related to global data on per capita power consumption. In the electricity generation section, annual load factors are given for the four nuclear stations. A brief review is made of hydro potential and monthly export/import figures for power to other countries (mostly export, especially in summer). Total electrical power output grew about 1.3% in the last year. Recent transmission line developments are noted, mostly 2x380kV, and including a link with Austria. In the financial section, consumer price indices are quoted for liquid and solid fuel, gas and electricity since 1966. Under administration, details are listed of the main and about 18 supporting Committees and working groups with special functions (e.g. tariffs, electrical vehicles). Public relations have included nuclear power press conferences, a mobile video unit, information leaflets for the media and a teaching seminar. (G.C.)

  11. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  12. Grounding modelling for transient overvoltage simulation in electric power transmission

    International Nuclear Information System (INIS)

    Moreno O, German; Valencia V, Jaime A; Villada, Fernando

    1992-01-01

    Grounding plays an important role in transmission line outages and consequently on electric energy transmission quality indexes. Fundamentals of an accurate modelling for transient behaviour analysis, particularly for the response of transmission lines to lightning, are presented. Also, a method to take into account the electromagnetic propagation guided by the grounding electrodes and finally to assess the grounding impedance in order to simulate the transmission line behaviour under lightning is presented. Analysis of impedance behaviour for diverse configurations and simulation results of over voltages on a real 220 kV line are presented to illustrate the capabilities of the method and of the computational program developed

  13. High Voltage Power Transmission for Wind Energy

    Science.gov (United States)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  14. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  15. Maximal network reliability for a stochastic power transmission network

    International Nuclear Information System (INIS)

    Lin, Yi-Kuei; Yeh, Cheng-Ta

    2011-01-01

    Many studies regarded a power transmission network as a binary-state network and constructed it with several arcs and vertices to evaluate network reliability. In practice, the power transmission network should be stochastic because each arc (transmission line) combined with several physical lines is multistate. Network reliability is the probability that the network can transmit d units of electric power from a power plant (source) to a high voltage substation at a specific area (sink). This study focuses on searching for the optimal transmission line assignment to the power transmission network such that network reliability is maximized. A genetic algorithm based method integrating the minimal paths and the Recursive Sum of Disjoint Products is developed to solve this assignment problem. A real power transmission network is adopted to demonstrate the computational efficiency of the proposed method while comparing with the random solution generation approach.

  16. Transmission cost allocation based on power flow tracing considering reliability benefit

    International Nuclear Information System (INIS)

    Leepreechanon, N.; Singharerg, S.; Padungwech, W.; Nakawiro, W.; Eua-Arporn, B.; David, A.K.

    2007-01-01

    Power transmission networks must be able to accommodate the continuously growing demand for reliable and economical electricity. This paper presented a method to allocate transmission use and reliability cost to both generators and end-consumers. Although transmission cost allocation methods change depending on the local context of the electric power industry, there is a common principle that transmission line capacity should be properly allocated to accommodate actual power delivery with an adequate reliability margin. The method proposed in this paper allocates transmission embedded cost to both generators and loads in an equitable manner, incorporating probability indices to allocate transmission reliability margin among users in both supply and demand sides. The application of the proposed method was illustrated using Bialek's tracing method on a multiple-circuit, six-bus transmission system. Probabilistic indices known as the transmission internal reliability margin (TIRM) and transmission external reliability margin (TERM) decomposed from the transmission reliability margin (TRM) were introduced, making true cost of using overall transmission facilities. 6 refs., 11 tabs., 5 figs

  17. Essays on electricity transmission investment and financial transmission rights

    Science.gov (United States)

    Shang, Wenzhuo

    The U.S. electric power industry has been going through fundamental restructuring and realignment since the 1990's. Many issues and problems have emerged during the transition, and both economists and engineers have been looking for the solutions fervently. In this dissertation, which consists primarily of three essays, we apply economics theory and techniques to the power industry and address two related issues, transmission investment and financial transmission rights (FTRs). The first essay takes the decentralized perspective and investigates the efficiency attribute of market-based transmission investment under perfect competition. We clarify, for the first time, the nature of the externality created by loop flows that causes transmission investment to be inefficient. Our findings have important implications for better understanding of transmission market design and creating incentives for efficient transmission investment. In the second essay, we define several rules for allocating transmission investment cost within the framework of cooperative game theory. These rules provide fair, stable or efficient cost allocations in theory and are good benchmarks against which the allocation mechanism in practice can be compared and improved upon. In the last essay, we make exploratory efforts in analyzing and assessing empirically the performance of the Midwest independent system operator (MISO) FTR auction market. We reveal some stylized facts about this young market and find that it is not efficient under the risk-neutrality assumption. We also point out and correct the drawbacks in previous related work and suggest about more complete empirical work in future. In all, this dissertation makes both theoretic and empirical analysis of the two hot issues related to the power industry and comes up with findings that have important implications for the development of this industry.

  18. Low-latency video transmission over high-speed WPANs based on low-power video compression

    DEFF Research Database (Denmark)

    Belyaev, Evgeny; Turlikov, Andrey; Ukhanova, Ann

    2010-01-01

    This paper presents latency-constrained video transmission over high-speed wireless personal area networks (WPANs). Low-power video compression is proposed as an alternative to uncompressed video transmission. A video source rate control based on MINMAX quality criteria is introduced. Practical...

  19. Design and Implementation of an over Current Protection Laboratory for Electrical Power Transmission Systems Based on PLC Techniques

    Directory of Open Access Journals (Sweden)

    Hassaan Th. H. Thabet

    2018-01-01

    Full Text Available This paper describes a modern approach for the protection of transmission lines to ensure theirsafety against the faults occurred in power systems. Our approach uses a Programmable LogicController (PLC to realize a transmission line as an over current protection relay. A conditioningcircuit was designed, implemented and tested to collect data obtained from Hall Effect sensors which convert them to suitable analog values compatible with PLC's inputs. Results obtained by our PLC control system are very similar to those obtained by the conventional relays but more efficient. An Automatic Reclosing System (ARS for remote faults is also included in this approach. Our PLC control system and its algorithm are illustrated in this paper also. This approach is designed to be used in electrical networks laboratories as an educational unit in electrical departments of engineering collages and technical institutes; it can be used also in real power systems through suitable interfacing facilities.

  20. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  1. An Interval Fuzzy-Stochastic Chance-Constrained Programming Based Energy-Water Nexus Model for Planning Electric Power Systems

    Directory of Open Access Journals (Sweden)

    Jing Liu

    2017-11-01

    Full Text Available In this study, an interval fuzzy-stochastic chance-constrained programming based energy-water nexus (IFSCP-WEN model is developed for planning electric power system (EPS. The IFSCP-WEN model can tackle uncertainties expressed as possibility and probability distributions, as well as interval values. Different credibility (i.e., γ levels and probability (i.e., qi levels are set to reflect relationships among water supply, electricity generation, system cost, and constraint-violation risk. Results reveal that different γ and qi levels can lead to a changed system cost, imported electricity, electricity generation, and water supply. Results also disclose that the study EPS would tend to the transition from coal-dominated into clean energy-dominated. Gas-fired would be the main electric utility to supply electricity at the end of the planning horizon, occupying [28.47, 30.34]% (where 28.47% and 30.34% present the lower bound and the upper bound of interval value, respectively of the total electricity generation. Correspondingly, water allocated to gas-fired would reach the highest, occupying [33.92, 34.72]% of total water supply. Surface water would be the main water source, accounting for more than [40.96, 43.44]% of the total water supply. The ratio of recycled water to total water supply would increase by about [11.37, 14.85]%. Results of the IFSCP-WEN model present its potential for sustainable EPS planning by co-optimizing energy and water resources.

  2. Nigeria's electric power sector reform: what should form the key objectives?

    International Nuclear Information System (INIS)

    Ikeme, J.; Ebohon, O.J.

    2005-01-01

    Nigeria's electric power sector requires substantial reform if the country's economic development and poverty alleviation program is to be realised. This understanding is behind the reform programme recently initiated by the Nigerian government with the goal of privatising the national electric power monopoly, NEPA. Currently, the country faces serious energy crisis due to declining electricity generation from domestic power plants which are basically dilapidated, obsolete, unreliable and in an appalling state of disrepair, reflecting the poor maintenance culture in the country and gross inefficiency of the public utility provider. Building on an analysis of the major shortcomings of the current electric power company, this paper presents the central issues that should form the key objectives of the proposed reform. This include corporatization of the electric power industry, increasing access and power delivery capacity, constraining the costs of the power industry and increasing efficiency and share of renewables in energy generation, as well as minimising environmental damage. We conclude with the observation that efforts at reform will not yield the desired result if the current end-user inefficiency is not constrained. As Nigeria implements its national utility privatisation programme, it is hoped that this review will benefit policy makers and emerging managers and providers of electricity service in the country

  3. Electric and magnetic field reduction by alternative transmission line options

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  4. Optimal Operation of Energy Storage in Power Transmission and Distribution

    Science.gov (United States)

    Akhavan Hejazi, Seyed Hossein

    In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider

  5. A Design of a 345-kV Electric Power Transmission Line Interlinking Ramu and Rouna Grids in Papua New Guinea

    Directory of Open Access Journals (Sweden)

    Sakato Francis

    2017-01-01

    Full Text Available According to PNG Power Limited (PPL, Papua New Guinea’s peak power demand is expected to increase from 210 MW in 2012 to 347 MW in 2026. Under the current state of the power sector in Papua New Guinea (PNG, it is critical to implement measures to cope with the increasing power demand to promote investment, economic growth, and ultimately to achieve poverty reduction through economic growth. One of the solutions identified to improve the reliability of PNG power systems and thus to meet the demand is to interconnect the major grids in the country so that the loads could be shared among them. This project embarks in designing a 345-kV electric power transmission line to interlink the Ramu and Rouna power grids of Papua New Guinea. The design is done by analysing all the necessary aspects of the transmission lines with in-depth calculations performed using MATHCAD software. This design is the basis for extra-high voltage (EHV transmission network in anticipation for the power generation and demand growth in PNG.

  6. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  7. Study for wireless power transmission of nuclear robot system

    International Nuclear Information System (INIS)

    Kim, Jongseog

    2013-01-01

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment

  8. Study for wireless power transmission of nuclear robot system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jongseog [Central Research Institute of Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2013-05-15

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment.

  9. Electric power transmission and distribution in Germany - an NTPA success

    International Nuclear Information System (INIS)

    Staschus, K.

    2002-01-01

    The German Energy Law of April 1998 opened 100 percent of the German electricity market to competition without any transition phase. Over four years later, the degree of market opening is still ahead of that in many other European countries. Transition phases elsewhere have been dominated by the need to develop detailed rules not only for the functioning of the power markets - e.g. in power exchanges - but also for the transmission and distribution system operators and for the data exchange between market participants. Especially the data exchange needs for the handling of household customers switching suppliers has been a challenge in all the countries that have opened the household customer market. But also the network access fees on both transmission and distribution level are still being debated in many countries. The German governments have so far chosen to let the network operators develop the access rules, pricing rules and data exchange standards in intense - and intensely observed - negotiations with the network users. Important outcomes of such negotiations include the well-known A ssociations' Agreements , GridCode, DistributionCode, MeteringCode as well as the government's Best Practice Recommendations on data exchange standards for the switching between suppliers. One important advantage of this negotiation-based rather than regulatory approach is its speed and flexibility. For example, the Associations' Agreement on network access fees is now valid in its third version, and each successive version included important learning from the experience of both network operators and network users with the previous agreement. This paper will summarise the legal framework of the liberalised power market in Germany and focus on the current state of pricing rules in the Associations' Agreement, of well advanced comparisons run by VDN, of the network access fees of hundreds of distribution system operators including specific data on structural differences of their

  10. Solving discretely-constrained MPEC problems with applications in electric power markets

    International Nuclear Information System (INIS)

    Gabriel, Steven A.; Leuthold, Florian U.

    2010-01-01

    Many of the European energy markets are characterized by dominant players that own a large share of their respective countries' generation capacities. In addition to that, there is a significant lack of cross-border transmission capacity. Combining both facts justifies the assumption that these dominant players are able to influence the market outcome of an internal European energy market due to strategic behavior. In this paper, we present a mathematical formulation in order to solve a Stackelberg game for a network-constrained energy market using integer programming. The strategic player is the Stackelberg leader and the independent system operator (including the decisions of the competitive fringe firms) acts as follower. We assume that there is one strategic player which results in a mathematical program with equilibrium constraints (MPEC). This MPEC is reformulated as mixed-integer linear program (MILP) by using disjunctive constraints and linearization. The MILP formulation gives the opportunity to solve the problems reliably and paves the way to add discrete constraints to the original MPEC formulation which can be used in order to solve discretely-constrained mathematical programs with equilibrium constraints (DC-MPECs). We report computational results for a small illustrative network as well as a stylized Western European grid with realistic data. (author)

  11. Solving discretely-constrained MPEC problems with applications in electric power markets

    Energy Technology Data Exchange (ETDEWEB)

    Gabriel, Steven A. [1143 Glenn L. Martin Hall, Department of Civil and Environmental Engineering, University of Maryland, College Park, MD 20742-3021 (United States); Leuthold, Florian U. [Chair of Energy Economics and Public Sector Management, Dresden University of Technology, 01069 Dresden (Germany)

    2010-01-15

    Many of the European energy markets are characterized by dominant players that own a large share of their respective countries' generation capacities. In addition to that, there is a significant lack of cross-border transmission capacity. Combining both facts justifies the assumption that these dominant players are able to influence the market outcome of an internal European energy market due to strategic behavior. In this paper, we present a mathematical formulation in order to solve a Stackelberg game for a network-constrained energy market using integer programming. The strategic player is the Stackelberg leader and the independent system operator (including the decisions of the competitive fringe firms) acts as follower. We assume that there is one strategic player which results in a mathematical program with equilibrium constraints (MPEC). This MPEC is reformulated as mixed-integer linear program (MILP) by using disjunctive constraints and linearization. The MILP formulation gives the opportunity to solve the problems reliably and paves the way to add discrete constraints to the original MPEC formulation which can be used in order to solve discretely-constrained mathematical programs with equilibrium constraints (DC-MPECs). We report computational results for a small illustrative network as well as a stylized Western European grid with realistic data. (author)

  12. Development of electric power transmission line anomaly approaching alarm system. Sodensen ijo sekkin keiho sochi no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kusaba, Masaro; Tabata, Takatoshi; Miyazaki, Shusuke [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1989-03-30

    In order to plan preventive measures from the occurrence of electric power transmission line accident, a power transmission line anomaly approaching alarm system was developed to automatically alarm the operators and surveillants. The surveillance system, composed of camera, surveillance unit proper and alarm receiving portion, generates alarm and indicate hazard to the operators, when animal invades a hazardous area designated on the monitor. Wireless telegraph for the alarm transmission use used frequency around a 322MHz band with the Radio Ray law and preventive measures from noise, taken into consideration. The prototype is characterized by unnecessary ancillary fitting to the surveillance object, rare erroneous operations and high reliability. While the hazardous area can be simply designated, changed and released, as made by volume on the control panel. It is moreover easy to designate, as done by confirming the surveillance object on the display. It is also possible in multidimensional surveillance and easy to use on site. 7 figs.

  13. Electric power system basics for the nonelectrical professional

    CERN Document Server

    Blume, Steven W

    2016-01-01

    The second edition of Steven W. Blume’s bestseller provides a comprehensive treatment of power technology for the non-electrical engineer working in the electric power industry. This book aims to give non-electrical professionals a fundamental understanding of large interconnected electrical power systems, better known as the “Power Grid”, with regard to terminology, electrical concepts, design considerations, construction practices, industry standards, control room operations for both normal and emergency conditions, maintenance, consumption, telecommunications and safety. The text begins with an overview of the terminology and basic electrical concepts commonly used in the industry then it examines the generation, transmission and distribution of power. Other topics discussed include energy management, conservation of electrical energy, consumption characteristics and regulatory aspects to help readers understand modern electric power systems.

  14. Electric power: liberalization in half-measure

    International Nuclear Information System (INIS)

    Pradel, P.

    1996-01-01

    The European directive about the electric power liberalization concerns only big consumers. These manufacturers have privileged relations with E.D.F. for long years with a very attractive price for the kilowatt hour. The change should not be very important, only more transparency in accounts and change in tariffs of power transmission: for example, a small electric power producer will be authorized to contest the buying price that E.D.F. imposes to him to transport the energy he produces. (N.C.)

  15. Balancing computation and communication power in power constrained clusters

    Science.gov (United States)

    Piga, Leonardo; Paul, Indrani; Huang, Wei

    2018-05-29

    Systems, apparatuses, and methods for balancing computation and communication power in power constrained environments. A data processing cluster with a plurality of compute nodes may perform parallel processing of a workload in a power constrained environment. Nodes that finish tasks early may be power-gated based on one or more conditions. In some scenarios, a node may predict a wait duration and go into a reduced power consumption state if the wait duration is predicted to be greater than a threshold. The power saved by power-gating one or more nodes may be reassigned for use by other nodes. A cluster agent may be configured to reassign the unused power to the active nodes to expedite workload processing.

  16. Power Transmission by Optical Fibers for Component Inherent Communication

    Directory of Open Access Journals (Sweden)

    Michael Dumke

    2010-02-01

    Full Text Available The use of optical fibers for power transmission has been investigated intensely. An optically powered device combined with optical data transfer offers several advantages compared to systems using electrical connections. Optical transmission systems consist of a light source, a transmission medium and a light receiver. The overall system performance depends on the efficiency of opto-electronic converter devices, temperature and illumination dependent losses, attenuation of the transmission medium and coupling between transmitter and fiber. This paper will summarize the state of the art for optically powered systems and will discuss reasons for negative influences on efficiency. Furthermore, an outlook on power transmission by the use of a new technology for creating polymer optical fibers (POF via micro dispensing will be given. This technology is capable to decrease coupling losses by direct contacting of opto-electronic devices.

  17. Valuation anomalies for interconnector transmission rights

    International Nuclear Information System (INIS)

    McInerney, Celine; Bunn, Derek

    2013-01-01

    Whilst the acquisition of physical transmission interconnector rights between two or more electricity markets can be structured as spread options on the spot prices of electricity between connected markets, empirical evidence suggests that actual prices may be quite different. This raises issues for the valuation of transmission rights, particularly in the European context of market harmonisation, and the use of transmission rights with increasing levels of wind penetration. We examine the price differentials between the Irish and British electricity markets, where explicit transmission capacity auctions have been persistently undersubscribed and transmission rights acquired but not fully utilised. We find significant empirical indications that auction prices for transmission rights are undervalued against both arbitrage and spread option valuations. We also find significant power flows against the efficient price spread direction. A survey of a group of experts with an interest in trading power between Ireland and Britain inform a number of possible explanations for the apparent inefficiencies. These include ex-post pricing in the Irish market, intermittent wind and strategic behaviour by dominant firms. - Highlights: ► Valuation anomalies for transmission rights highlight lack of market integration. ► Exports constrained from market with ex post pricing and no hedging mechanisms. ► High start-up costs for balancing plant may deter exports from high wind regions. ► Deadband created by capacity payments based on flows versus availability

  18. Transmission Lines or Poles, Electric, Electric transmission lines locations provided to us from Kansas City Power and Light and City of Gardner only at this time. AIMS is working on getting other providers in area. Data is limited to CUE (Collaborative Utility Exchange) Participants and subc, Published in 2004, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Transmission Lines or Poles, Electric dataset current as of 2004. Electric transmission lines locations provided to us from Kansas City Power and Light and City of...

  19. The development of electric power/energy trading in Norway

    International Nuclear Information System (INIS)

    Engebretsen, J.D.

    1992-01-01

    One of the main aims of the Norwegian government is to make the electric power market more effective. A new energy law has been passed and other initiatives have been taken which have altered the framework of the conditions for electricity production and sales in Norway. The proposition for trading electric power and the development of new policies for calculating transmission tariffs has been dealt with in addition to plans for the extent of the development of hydroelectric power. Norway is the world's sixth largest producer of hydroelectricity. The domestic supply of electricity is described as well as the nature of the reorganization of the transmission of electricity and Norwegian foreign trade proposals within this area. The government is interested in taxing with regard to production instead of on the power itself in order to stimulate better energy economy. It is important that this will have a neutral effect between export and domestic consumption when contract sales to abroad are initiated. A more efficient electric power market will profit Norwegian society. Statistical data are included. (AB)

  20. Impacts on human health from the coal and nuclear fuel cycles and other technologies associated with electric power generation and transmission

    International Nuclear Information System (INIS)

    Radford, E.P.

    1980-07-01

    The report evaluates major public health impacts of electric power generation and transmission associated with the nuclear fuel cycle and with coal use. Only existing technology is evaluated. For the nuclear cycle, effects of future use of fuel reprocessing and long-term radioactive waste disposal are briefly considered. The health effects of concern are those leading to definable human disease and injury. Health effects are scaled to numbers of persons and activities associated with a nominal 1000-megawatt electric plant fueled by either option. Comparison of the total health effects to the general public shows that the health risks from the coal cycle are about 50 times greater than for the nuclear cycle (coal, 0.7-3.7 major health effects per 1000 MWe per year; nuclear, 0.03-0.05 per 1000 MWe per year). For workers, these rates are higher. No evidence is found that electrical transmission contributes any health effects to the general public, except when broken power lines come in contact with people

  1. Modeling and analysis of strategic forward contracting in transmission constrained power markets

    International Nuclear Information System (INIS)

    Yu, C.W.; Chung, T.S.; Zhang, S.H.; Wang, X.

    2010-01-01

    Taking the effects of transmission network into account, strategic forward contracting induced by the interaction of generation firms' strategies in the spot and forward markets is investigated. A two-stage game model is proposed to describe generation firms' strategic forward contracting and spot market competition. In the spot market, generation firms behave strategically by submitting bids at their nodes in a form of linear supply function (LSF) and there are arbitrageurs who buy and resell power at different nodes where price differences exceed the costs of transmission. The owner of the grid is assumed to ration limited transmission line capacity to maximize the value of the transmission services in the spot market. The Cournot-type competition is assumed for the strategic forward contract market. This two-stage model is formulated as an equilibrium problem with equilibrium constraints (EPEC); in which each firm's optimization problem in the forward market is a mathematical program with equilibrium constraints (MPEC) and parameter-dependent spot market equilibrium as the inner problem. A nonlinear complementarity method is employed to solve this EPEC model. (author)

  2. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  3. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  4. Electric power distribution. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, H; Frohne, H; Vaske, P

    1982-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  5. Electric Power Generation, Transmission and Distribution (NAICS 2211)

    Science.gov (United States)

    Find EPA regulatory information for electrical utilities, including coal-fired power plants. Includes links to NESHAPs for RICE, stationary combustion engines, fossil fuel waste, cooling water, effluent guidelines. Find information on the MATS rule.

  6. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  7. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Information is appended on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  8. Electric power development in the USSR

    International Nuclear Information System (INIS)

    Rudenko, Y.N.

    1993-01-01

    The generation of electric power in the USSR is based on the Unified Electric Power System (UEPS) whose network cover most of the habitable territory of the country. Therefore, the development of the UEPS governs the overall evolution of the electric power generation in the country. At present, eleven out of thirteen joint electric power systems, which supply electricity to most of the USSR, are operating within the UEPS. The total electric power generation in the country reached 1728 billion kWh in 1990, of which the UEPS supplied approximately 90%. About 70% of installed capacity of the UEPS is fossil-fuelled power plants, about 12 % is nuclear power plants, and about 18% is hydroelectric power plants. The system-forming grid of the UEPS is made up of transmission lines of 220, 330, 500 and 750 kV. The on-line supervisory control of the UEPS is achieved by four-level automated system of dispatch control (UEPS, joint electric power systems, regional electric power systems, electric power plants, substations,electric grid regions). The development and extension of the UEPS in the USSR ensure higher reliability and quality of electric power supply to end-users, combined with higher efficiency. The principal problem facing the UEPS are as follows: the need to ensure environmental protection and efficiency of the steam power plants; to improve the safety and efficiency of nuclear power plants. The solution to these problems will define the conditions of the UEPS development, as well as electric power systems of other countries, at least for the coming two decades. This paper characterizes the peculiarities of the UEPS development over the last 20 years, including the installed capacity structure and the system-forming electric power grid. Special attention is paid to the environmental problems related to functioning and development of the UEPS and to the means of their solution. (author)

  9. Optimal planning of the Nordic transmission system with 100% electric vehicle penetration of passenger cars by 2050

    International Nuclear Information System (INIS)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif; Liu, Zhaoxi

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector. However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS (Efi's multi-area power market simulator) and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16 A. The complete electrification of the private passenger fleet increases the yearly power demand in the Nordic region with ca 7.5%. The profitable increases in transmission capacities are highest for dumb charging, but are very low for both dumb and spot price based charging compared to a Reference case. - Highlights: • The electric vehicle distribution is done using population and car statistics. • The 100% penetration electric vehicle demand is obtained for Nordic countries. • The optimal investments in the Nordic transmission system with electric vehicles are studied.

  10. Superconducting power transmission: the perils and promise

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, E B

    1976-06-01

    The development of bulk electricity transmission systems must be considered in the light of changing growth rates, increasing resistances to ehv overhead transmission and the tendency to concentrate generation in fewer sites. Helium-cooled or superconducting cables possess technical characteristics which will make them suitable as utility network components for power transmission over distances of ten to several hundred miles. These properties are illustrated by considering two applications in existing electrical networks. The first is a 43 mile system to transmit 4800 MVA and the second is a potential application under study in Pennsylvania to transmit 10,000 MVA over a distance of 350 miles or so. Helium-cooled versions of these transmission systems were designed to permit technical and economic evaluations. The major groups and institutions throughout the world engaged in the development of helium-cooled cables are listed and aspects of the technical approaches are briefly described.

  11. Electric power in Canada, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (82 tabs., 23 figs.)

  12. Electric power in Canada, 1989

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (78 tabs., 27 figs.)

  13. Amelioration of Electrical Power Quality based on Modulated Power Filter Compensator

    Directory of Open Access Journals (Sweden)

    Karrar Hameed Kadhim

    2017-08-01

    Full Text Available This paper deals with the performance of modeling and implementation of Modulated Power Filter Compensator ( MPFC based on synchronous generator to enhance Electrical Power Quality (EPQ performance , rectification power factor , voltage fixity and decreasing transmission line losses for 300 km transmission line . In this paper (MPFC sketch attendants for intelligent network stability and optimum exploitation. The proposal Flexible AC Transmission Systems ( FACTS can be expanded to distributed renewable energy interface and exploitation systems and also will be easy to modify for voltage fixity, Achieve the required stability, perfect usage and Compensation requirements. MATLAB SIMLINK version R2009b were used as a model of (MPFC.

  14. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    1975-09-01

    The major issues examined in the comparison of the DIST and HNEC transmission concepts are: (1) type of transmission to be employed and an assessment of its technical feasibility, (2) availability of rights-of-way, (3) economics, (4) environmental impact, and (5) overall reliability of the transmission system. The type of transmission selected for bulk power transfer from an HNEC for the time period studied is overhead AC, 500 kV double or single circuit, a voltage currently used in the PNW system. This type of system can accommodate growth up to at least 23,000 MW of thermal capacity at an HNEC. Significant additional transmountain capacity needs would require 1100 kV transmission, which should be technologically proved by the end of the 1970s. (auth)

  15. Economic assessment group on power transmission and distribution networks tariffs

    International Nuclear Information System (INIS)

    2000-06-01

    Facing the new law on the electric power market liberalization, the french government created an experts group to analyze solutions and assessment methods of the electrical networks costs and tariffs and to control their efficiency. This report presents the analysis and the conclusions of the group. It concerns the three main subjects: the regulation context, the tariffing of the electric power transmission and distribution (the cost and efficiency of the various options) and the tariffing of the electric power supply to the eligible consumers. The authors provide a guideline for a tariffing policy. (A.L.B.)

  16. Wireless Power Transmission via Sheet Medium Using Automatic Phase Adjustment of Multiple Inputs

    Science.gov (United States)

    Matsuda, Takashi; Oota, Toshifumi; Kado, Youiti; Zhang, Bing

    The wireless power transmission via sheet medium is a novel physical form of communication that utilizes the surface as a medium to provide both data and power transmission services. To efficiently transmit a relatively-large amount of electric power (several watts), we have developed a wireless power transmission system via sheet medium that concentrates the electric power on a specific spot by using phase control of multiple inputs. However, to find the optimal phases of the multiple inputs making the microwave converge on a specific spot in the sheet medium, the prior knowledge of the device's position, and the pre-experiment measuring the output power, are needed. In wireless communication area, it is known that the retrodirective array scheme can efficiently transmit the power in a self-phasing manner, which uses the pilot signals sent by the client devices. In this paper, we apply the retrodirective array scheme to the wireless power transmission system via sheet medium, and propose a power transmission scheme using the phase-adjustment of multiple inputs. To confirm the effectiveness of the proposal scheme, we evaluate its performance by computer simulation and realistic measurement. Both results show that the proposal scheme can achieve the retrodirectivity over the wireless power transmission via sheet medium.

  17. Transmission and distribution electrical engineering

    CERN Document Server

    Bayliss, Colin

    2003-01-01

    This comprehensive treatment of the theory and practice encountered in the installation and design of transmission and distribution systems for electrical power has been updated and revised to provide the project engineer with all the latest, relevant information to design and specify the correct system for a particular application.Thoroughly updated and revised to include latest developmentsLearn from and Author with extensive experience in managing international projectsFind out the reasoning and implicatons behind the different specifications and methods

  18. Wireless power transfer for electric vehicle

    OpenAIRE

    Mude, Kishore Naik

    2015-01-01

    Wireless Power Transfer (WPT) systems transfer electric energy from a source to a load without any wired connection. WPTs are attractive for many industrial applications because of their advantages compared to the wired counterpart, such as no exposed wires, ease of charging, and fearless transmission of power in adverse environmental conditions. Adoption of WPTs to charge the on-board batteries of an electric vehicle (EV) has got attention from some companies, and efforts are being made for ...

  19. Electric utilities deregulation and its impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Trehan, N.K.

    1998-01-01

    Under restructuring and deregulation, it is not clear as to who would have the responsibility, and what obligations the market participants would have to ensure that the electrical system reliability (stability) is maintained. Due to the dynamic nature of the electrical grid, especially with the implementation of restructuring and deregulation, vulnerabilities exist which may impact the reliability (stability) of the offsite electrical power system. In a nuclear power generating unit, an offsite electric power system and an onsite electric power system are required to permit the functioning of structures, systems, and components which are important to safety. The safety function for each system is to provide sufficient capacity and capability to assure that the containment integrity is maintained during power operation or in the event of a postulated accident. Analyses performed by the applicants must verify that the electrical grid remains stable in the event of a loss of the nuclear unit generator, the largest other unit on the grid or the most critical transmission line. The stability of the electric grid is assumed in the safety analyses and a change in it would impact those analyses. However, it may impact the availability of a stable electric power to the safety buses because of the limited number of available transmission lines. This paper discusses electrical power generation and demand, reserve margins, power transfer capability, development of new innovative technologies to compensate for lack of the construction of transmission lines, legislation for the formulation of a self regulation organization (SRO), grid disturbances that may lead to a voltage collapse, and the vulnerabilities which may impact the availability of a stable power to the nuclear power generating stations

  20. Optimization of output power and transmission efficiency of magnetically coupled resonance wireless power transfer system

    Science.gov (United States)

    Yan, Rongge; Guo, Xiaoting; Cao, Shaoqing; Zhang, Changgeng

    2018-05-01

    Magnetically coupled resonance (MCR) wireless power transfer (WPT) system is a promising technology in electric energy transmission. But, if its system parameters are designed unreasonably, output power and transmission efficiency will be low. Therefore, optimized parameters design of MCR WPT has important research value. In the MCR WPT system with designated coil structure, the main parameters affecting output power and transmission efficiency are the distance between the coils, the resonance frequency and the resistance of the load. Based on the established mathematical model and the differential evolution algorithm, the change of output power and transmission efficiency with parameters can be simulated. From the simulation results, it can be seen that output power and transmission efficiency of the two-coil MCR WPT system and four-coil one with designated coil structure are improved. The simulation results confirm the validity of the optimization method for MCR WPT system with designated coil structure.

  1. Integrated Computing, Communication, and Distributed Control of Deregulated Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bajura, Richard; Feliachi, Ali

    2008-09-24

    Restructuring of the electricity market has affected all aspects of the power industry from generation to transmission, distribution, and consumption. Transmission circuits, in particular, are stressed often exceeding their stability limits because of the difficulty in building new transmission lines due to environmental concerns and financial risk. Deregulation has resulted in the need for tighter control strategies to maintain reliability even in the event of considerable structural changes, such as loss of a large generating unit or a transmission line, and changes in loading conditions due to the continuously varying power consumption. Our research efforts under the DOE EPSCoR Grant focused on Integrated Computing, Communication and Distributed Control of Deregulated Electric Power Systems. This research is applicable to operating and controlling modern electric energy systems. The controls developed by APERC provide for a more efficient, economical, reliable, and secure operation of these systems. Under this program, we developed distributed control algorithms suitable for large-scale geographically dispersed power systems and also economic tools to evaluate their effectiveness and impact on power markets. Progress was made in the development of distributed intelligent control agents for reliable and automated operation of integrated electric power systems. The methodologies employed combine information technology, control and communication, agent technology, and power systems engineering in the development of intelligent control agents for reliable and automated operation of integrated electric power systems. In the event of scheduled load changes or unforeseen disturbances, the power system is expected to minimize the effects and costs of disturbances and to maintain critical infrastructure operational.

  2. Wireless power transmission using ultrasonic guided waves

    International Nuclear Information System (INIS)

    Kural, A; Pullin, R; Featherston, C; Holford, K; Paget, C

    2011-01-01

    The unavailability of suitable power supply at desired locations is currently an important obstacle in the development of distributed, wireless sensor networks for applications such as structural health monitoring of aircraft. Proposed solutions range from improved batteries to energy harvesting from vibration, temperature gradients and other sources. A novel approach is being investigated at Cardiff University School of Engineering in cooperation with Airbus. It aims to utilise ultrasonic guided Lamb waves to transmit energy through the aircraft skin. A vibration generator is to be placed in a location where electricity supply is readily available. Ultrasonic waves generated by this device will travel through the aircraft structure to a receiver in a remote wireless sensor node. The receiver will convert the mechanical vibration of the ultrasonic waves back to electricity, which will be used to power the sensor node. This paper describes the measurement and modelling of the interference pattern which emerges when Lamb waves are transmitted continuously as in this power transmission application. The discovered features of the pattern, such as a large signal amplitude variation and a relatively high frequency, are presented and their importance for the development of a power transmission system is discussed.

  3. Wireless power transmission using ultrasonic guided waves

    Energy Technology Data Exchange (ETDEWEB)

    Kural, A; Pullin, R; Featherston, C; Holford, K [School of Engineering, Cardiff University, Queens Buildings, The Parade, Cardiff CF24 2AA (United Kingdom); Paget, C, E-mail: kurala@cardiff.ac.uk [Airbus Operations Ltd, New Filton Road, BS99 7AR Bristol (United Kingdom)

    2011-07-19

    The unavailability of suitable power supply at desired locations is currently an important obstacle in the development of distributed, wireless sensor networks for applications such as structural health monitoring of aircraft. Proposed solutions range from improved batteries to energy harvesting from vibration, temperature gradients and other sources. A novel approach is being investigated at Cardiff University School of Engineering in cooperation with Airbus. It aims to utilise ultrasonic guided Lamb waves to transmit energy through the aircraft skin. A vibration generator is to be placed in a location where electricity supply is readily available. Ultrasonic waves generated by this device will travel through the aircraft structure to a receiver in a remote wireless sensor node. The receiver will convert the mechanical vibration of the ultrasonic waves back to electricity, which will be used to power the sensor node. This paper describes the measurement and modelling of the interference pattern which emerges when Lamb waves are transmitted continuously as in this power transmission application. The discovered features of the pattern, such as a large signal amplitude variation and a relatively high frequency, are presented and their importance for the development of a power transmission system is discussed.

  4. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 23 figs., 95 tabs

  5. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The electric power industry in Canada in 1991 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  6. An agent-based analysis of the German electricity market with transmission capacity constraints

    International Nuclear Information System (INIS)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A.

    2009-01-01

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market.

  7. An agent-based analysis of the German electricity market with transmission capacity constraints

    Energy Technology Data Exchange (ETDEWEB)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A. [University of Mannheim, Dieter Schwarz Chair of Business Administration, E-Business and E-Government, 68131 Mannheim (Germany)

    2009-10-15

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market. (author)

  8. Optimal transmission planning under the Mexican new electricity market

    International Nuclear Information System (INIS)

    Zenón, Eric; Rosellón, Juan

    2017-01-01

    This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process. - Highlights: • We model transmission planning (PRODESEN) in the Mexican new electricity market. • We propose a first model with a price-cap mechanism to promote network expansion. • In a second power-flow model, we study centrally-planned grid expansions. • The PRODESEN appears to be a convergent welfare-optimal planning process. • Incentive regulation could further help to implement such an optimal process.

  9. Impact of GB transmission charging on renewable electricity generation

    International Nuclear Information System (INIS)

    2006-01-01

    The Government is committed to meeting its objective of producing 10% of UK electricity supplies from renewable sources by 2010, subject to the cost to the consumer being acceptable. It is generally believed that northern Scotland - and the Highlands and Islands in particular - will be a significant source of renewable energy in future, mostly in the form of wind power; wave and tidal energy may also be important. The National Grid Company (NGC) is responsible for formulating a cost-reflective and. non-discriminatory electricity transmission charging methodology for Great Britain (GB). This determines Transmission Network Use of System (TNUoS) tariffs, which are paid by transmission-connected generators and suppliers for the use of the high voltage transmission network. Following the publication of National Grid Company's 'GB Transmission Charging: Initial Thoughts' document on 16 December 2003, there was particular concern that the level of future Transmission Network Use of System (TNUoS) tariffs in northern Scotland might impede the achievement of the Government's 2010 target for renewable electricity supplies. That document and subsequent revisions indicate that generation TNUoS charges in northern Scotland were likely to be significantly higher than anywhere else in GB. The study attempts to quantify the effect of the proposed GB-wide TNUoS charging methodology on the future growth of renewable electricity so as to ascertain the impact on the likelihood of meeting the Government's 2010 target. (UK)

  10. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  11. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  12. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  13. Transmission Characteristics of an OFDM signal for Power Line Communication System with High Bit Rate

    Science.gov (United States)

    Mori, Akira; Watanabe, Yosuke; Tokuda, Masamitsu; Kawamoto, Koji

    In this paper, we measured what influence the sinusoidal transmission characteristics of the electric power line with various forms gave to the transmission characteristic of OFDM (Orthogonal Frequency Division Multiplexing) signal through PLC (power line communication system) modem. We classified the electric power line transmission line with various forms in a real environment into two basic elements, which are an outlet type branch and a switch type branch. Next, PHY rate (Physical rate) is measured for each basic element connected with the PLC modem. At this time, the transmission characteristics of the electric power line are simulated from measured data. OFDM sending and receiving systems are composed on the computer, and the PHY rate is simulated. By comparing with measured and calculated values, it is revealed that PHY rate of PLC modem is most affected in the case of the power line transmission characteristics having broad band and high level attenuation and group delay variation, and is not affected in the case of that having narrow band attenuation and group delay variation.

  14. High power RF transmission line component development

    International Nuclear Information System (INIS)

    Hong, B. G.; Hwang, C. K.; Bae, Y. D.; Yoon, J. S.; Wang, S. J.; Gu, S. H.; Yang, J. R.; Hahm, Y. S.; Oh, G. S.; Lee, J. R.; Lee, W. I.; Park, S. H.; Kang, M. S.; Oh, S. H.; Lee, W.I.

    1999-12-01

    We developed the liquid stub and phase shifter which are the key high RF power transmission line components. They show reliable operation characteristics and increased insulation capability, and reduced the size by using liquid (silicon oil, dielectric constant ε=2.72) instead of gas for insulating dielectric material. They do not have finger stock for the electric contact so the local temperature rise due to irregular contact and RF breakdown due to scratch in conductor are prevented. They can be utilized in broadcasting, radar facility which require high RF power transmission. Moreover, they are key components in RF heating system for fusion reactor. (author)

  15. High power RF transmission line component development

    Energy Technology Data Exchange (ETDEWEB)

    Hong, B. G.; Hwang, C. K.; Bae, Y. D.; Yoon, J. S.; Wang, S. J.; Gu, S. H.; Yang, J. R.; Hahm, Y. S.; Oh, G. S.; Lee, J. R.; Lee, W. I.; Park, S. H.; Kang, M. S.; Oh, S. H.; Lee, W.I

    1999-12-01

    We developed the liquid stub and phase shifter which are the key high RF power transmission line components. They show reliable operation characteristics and increased insulation capability, and reduced the size by using liquid (silicon oil, dielectric constant {epsilon}=2.72) instead of gas for insulating dielectric material. They do not have finger stock for the electric contact so the local temperature rise due to irregular contact and RF breakdown due to scratch in conductor are prevented. They can be utilized in broadcasting, radar facility which require high RF power transmission. Moreover, they are key components in RF heating system for fusion reactor. (author)

  16. Impacts on human health from the coal and nuclear fuel cycles and other technologies associated with electric power generation and transmission

    International Nuclear Information System (INIS)

    Radford, E.P.

    1980-01-01

    Major public health impacts of electric power generation and transmission associated with the nuclear fuel cycle and with coal use are evaluated. Only existing technology is evaluated. The only health effects of concern are those leading to definable human disease and injury. Health effects are scaled to a nominal 1000 Megawatt (electric) plant fueled by either option. Comparison of the total health effects to the general public gives: nuclear, 0.03 to 0.05 major health effects per 1000 MWe per year; coal, 0.7 to 3.7 per 1000 MWe per year. Thus for the general public the health risks from the coal cycle are about 50 times greater than for the nuclear cycle. Health effects to workers in the industry are currently quite high. For the nuclear cycle, 4.6 to 5.1 major health impacts per 1000 MWe per year; for coal, 6.5 to 10.9. The two-fold greater risk for the coal cycle is primarily due to high injury rates in coal miners. There is no evidence that electrical transmission contributes any health effects to the general public, except for episodes where broken power lines come in contact with people. For power line workers, the risk is estimated at 0.1 serious injury per 1000 MWe per year

  17. ELMO model predicts the price of electric power

    International Nuclear Information System (INIS)

    Antila, H.

    2001-01-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons

  18. Transmission and wind investment in a deregulated electricity industry

    DEFF Research Database (Denmark)

    Maurovich-Horvat, Lajos; Boomsma, Trine Krogh; Fleten, Stein-Erik

    2013-01-01

    carrying out investment in wind farms. In this paper, we analyse the interaction between the two conflicting objectives under various assumptions about the electricity market structure and the degree of producers' market power. Via a three-node illustrative example, we show that a merchant investor...... the auspices of a regulated welfare-maximising planner, recent restructuring of electricity industries has introduced a merchant model for transmission investment, which provides congestion rents from construction of a new line. Thus, the merchant investor's incentives are different from those of producers...... typically builds less transmission capacity than a welfare-maximising transmission system operator or central planner. Although social welfare is lower and nodal prices are generally higher with a merchant investor and when producers are assumed to behave à la Cournot, the effect of lower price response...

  19. Transmission rights and market power

    International Nuclear Information System (INIS)

    Bushnell, J.

    1999-01-01

    Most of the concerns about physical transmission rights relate to the ability to implicitly or explicitly remove that transmission capacity from the market-place. Under a very strict form of physical right, owners could simply choose not to sell it if they don't want to use it. Modifications that require the release of spare capacity back into an open market could potentially alleviate this problem but there is concern that such releases would not occur far enough in advance to be of much use to schedulers. Similarly, the transmission capacity that is made available for use by non-rights holders can also be manipulated by the owners of transmission rights. The alternative form, financial transmission rights, provide to their owners congestion payments, but physical control of transmission paths. In electricity markets such as California's, even financial transmission rights could potentially be utilized to effectively withhold transmission capacity from the marketplace. However, methods for withholding transmission capacity are somewhat more convoluted, and probably more difficult, for owners of financial rights than for owners of physical rights. In this article, the author discusses some of the potential concerns over transmission rights and their use for the exercise of various forms of market power

  20. Virtual scarce water embodied in inter-provincial electricity transmission in China

    International Nuclear Information System (INIS)

    Zhang, Chao; Zhong, Lijin; Liang, Sai; Sanders, Kelly T.; Wang, Jiao; Xu, Ming

    2017-01-01

    Highlights: • Virtual water in inter-provincial electricity transmission in China is calculated. • A Water Stress Index is used to reflect relative scarcity of water consumption. • West Inner Mongolia is the largest exporter of scarce water. • Hebei, Beijing and Shandong are the three largest receivers of scarce water. - Abstract: Intra-national electricity transmission drives virtual water transfer from electricity production regions to electricity consumption regions. In China, the water-intensive thermoelectric power industry is expanding quickly in many water-scarce energy production hubs in northern and northwestern provinces. This study constructed a node-flow model of inter-provincial electricity transmission to investigate the virtual water and scarcity-adjusted virtual water (or virtual scarce water) embodied in the electricity transmission network. It is revealed that total inter-provincial virtual water transfer embodied in electricity transmission was 623 million m"3 in 2011, equivalent to 12.7% of the national total thermoelectric water consumption. The top three largest single virtual water flows are West Inner Mongolia-to-Beijing (44 million m"3), East Inner Mongolia-to-Liaoning (39 million m"3), and Guizhou-to-Guangdong (37 million m"3). If the actual volumes of consumptive water use are translated into scarcity-adjusted water consumption based on Water Stress Index, West Inner Mongolia (81 million m"3), Shanxi (63 million m"3) and Ningxia (30 million m"3) become the top three exporters of virtual scarce water. Many ongoing long-distance electricity transmission projects in China will enlarge the scale of scarce water outflows from northwestern regions and potentially increase their water stress.

  1. SimWIND: A geospatial infrastructure model for optimizing wind power generation and transmission

    International Nuclear Information System (INIS)

    Phillips, Benjamin R.; Middleton, Richard S.

    2012-01-01

    Wind is a clean, enduring energy resource with the capacity to satisfy 20% or more of U.S. electricity demand. Presently, wind potential is limited by a paucity of electrical transmission lines and/or capacity between promising wind resources and primary load centers. We present the model SimWIND to address this shortfall. SimWIND is an integrated optimization model for the geospatial arrangement and cost minimization of wind-power generation–transmission–delivery infrastructure. Given a set of possible wind-farm sites, the model simultaneously determines (1) where and how much power to generate and (2) where to build new transmission infrastructure and with what capacity in order to minimize the cost for delivering a targeted amount of power to load. Costs and routing of transmission lines consider geographic and social constraints as well as electricity losses. We apply our model to the Electric Reliability Council of Texas (ERCOT) Interconnection, considering scenarios that deliver up to 20 GW of new wind power. We show that SimWIND could potentially reduce ERCOT's projected ∼$5B transmission network upgrade line length and associated costs by 50%. These results suggest that SimWIND's coupled generation–transmission–delivery modeling approach could play a critical role in enhancing planning efforts and reducing costs for wind energy integration. - Highlights: ► Wind power is limited by transmission capacity between resources and demands. ► SimWIND is a coupled generation-transmission-delivery model for wind infrastructure. ► The model minimizes costs considering realistic transmission routing and networking. ► We show that SimWIND could save 50% of $5B costs for expanding the Texas grid. ► Results suggest SimWIND may play a critical role in enhancings wind planning efforts.

  2. Market tools: the immaterial part of the electricity transmission network

    International Nuclear Information System (INIS)

    Maillard, Dominique

    2014-01-01

    The author first evokes the activities of RTE (Reseau de transport d'electricite - the French power transmission network) to improve the performance of its technical and industrial equipment (notably equipment evolution, maintenance policies) with, for example, the installation of a fibre optic network for network control automation, the development of software for a better exploitation and steering of electricity fluxes, notably the electricity produced by wind and photovoltaic power. He more particularly addresses the role of RTE in the construction of the electricity market. He outlines the role of the European electricity market in the economic optimization, the new approaches and tools for a higher flexibility of the electric system, the expertise of RTE, and the perspective of always more smart grids

  3. Needs for Constructing and Possibilities of Nuclear Power Plants Interconnection to the Croatian Electricity Grid

    International Nuclear Information System (INIS)

    Zeljko, M.; Bajs, D.

    1998-01-01

    Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author)

  4. Modeling particle emission and power flow in pulsed-power driven, nonuniform transmission lines

    Directory of Open Access Journals (Sweden)

    Nichelle Bruner

    2008-04-01

    Full Text Available Pulsed-power driven x-ray radiographic systems are being developed to operate at higher power in an effort to increase source brightness and penetration power. Essential to the design of these systems is a thorough understanding of electron power flow in the transmission line that couples the pulsed-power driver to the load. In this paper, analytic theory and fully relativistic particle-in-cell simulations are used to model power flow in several experimental transmission-line geometries fielded on Sandia National Laboratories’ upgraded Radiographic Integrated Test Stand [IEEE Trans. Plasma Sci. 28, 1653 (2000ITPSBD0093-381310.1109/27.901250]. Good agreement with measured electrical currents is demonstrated on a shot-by-shot basis for simulations which include detailed models accounting for space-charge-limited electron emission, surface heating, and stimulated particle emission. Resonant cavity modes related to the transmission-line impedance transitions are also shown to be excited by electron power flow. These modes can drive oscillations in the output power of the system, degrading radiographic resolution.

  5. Transmission Reinforcements in the Central American Regional Power System

    Energy Technology Data Exchange (ETDEWEB)

    Elizondo, Marcelo A.; Vallem, Mallikarjuna R.; Samaan, Nader A.; Makarov, Yuri V.; Vyakaranam, Bharat; Nguyen, Tony B.; Munoz, Christian; Herrera, Ricardo; Midence, Diego; Shpitsberg, Anna

    2016-07-25

    The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

  6. Energy losses of superconducting power transmission cables in the grid

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Okholm, Jan; Lomholt, Karin

    2001-01-01

    One of the obvious motives for development of superconducting power transmission cables is reduction of transmission losses. Loss components in superconducting cables as well as in conventional cables have been examined. These losses are used for calculating the total energy losses of conventional...... as well as superconducting cables when they are placed in the electric power transmission network. It is concluded that high load connections are necessary to obtain energy saving by the use of HTSC cables. For selected high load connections, an energy saving of 40% is expected. It is shown...

  7. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  8. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  9. Case study on the US superconducting power transmission program

    Energy Technology Data Exchange (ETDEWEB)

    Hammel, E.F.

    1996-02-01

    After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

  10. Commercial information system of Slovak Electricity Transmission System, Plc

    International Nuclear Information System (INIS)

    Laznicka, L.

    2004-01-01

    Commercial Information System (CIS), which main role of is to support the commercial activities of the company, is built up by business department of SEPS, Plc in close co-operation with the supplier company Sfera, Plc. The system entries are data from electricity meters obtained by automatized data acquisition and from bugging sheets, contractual hour diagrams, parameters of transmission system like measuring schemes and formulas for calculation of demand and supply, contractual data resulting from agreements, business conditions, URSO decisions and valid legislative. A part of the system is also support of process of data evaluation like calculation of transmitted energy quantity, calculation of actual output diagrams, comparison of actual and contractual diagrams, calculation of system divergence, calculation of demand divergence, etc. The final price for the drawings of services, which are joined with transmission of the electric power will be determined by the accounting process. In this causality there are automatically made out invoices for access, losses, system charges, system services, short-term and long-term transits, divergences and for cross-border transmission auctions. System also generates various specialized synopses and statistics for the evaluation requirements of important aspects and for parameter observations. Successive liberalisation of the electricity power market, changes in legislative and URSO decisions require CIS to be sufficiently configurable and to adapt flexible on the alternating environs. (author)

  11. Electric power annual 1998. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The purpose of this report, Electric Power Annual 1998 Volume 1 (EPAVI), is to provide a comprehensive overview of the electric power industry during the most recent year for which data have been collected, with an emphasis on the major changes that occurred. In response to the changes of 1998, this report has been expanded in scope. It begins with a general review of the year and incorporates new data on nonutility capacity and generation, transmission information, futures prices from the Commodity futures Trading commission, and wholesale spot market prices from the pennsylvania-new Jersey-Maryland Independent System Operator and the California Power Exchange. Electric utility statistics at the Census division and State levels on generation, fuel consumption, stocks, delivered cost of fossil fuels, sales to ultimate customers, average revenue per kilowatthour of electricity sold, and revenues from those retail sales can be found in Appendix A. The EPAVI is intended for a wide audience, including Congress, Federal and State agencies, the electric power industry, and the general public.

  12. Optimal Planning of the Nordic Transmission System with 100% Electric Vehicle Penetration of passenger cars by 2050

    DEFF Research Database (Denmark)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector....... However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments...... of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16A. The complete...

  13. An Optimum Solution for Electric Power Theft

    Directory of Open Access Journals (Sweden)

    Aamir Hussain Memon

    2013-07-01

    Full Text Available Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already

  14. An Optimum Solution for Electric-Power Theft

    International Nuclear Information System (INIS)

    Memon, A.H.; Memon, F.

    2013-01-01

    Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments) Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already. (author)

  15. Integrated Cost Allocation of Transmission Usage under Electricity Markets

    Directory of Open Access Journals (Sweden)

    Hermagasantos Zein

    2012-08-01

    Full Text Available Cost allocation of transmission usage on the power networks is an important issue especially in the modern electricity market mechanism. In this context, all costs that have been embedded in the transmission, embedded cost, should be covered by the transmission users. This paper follows general methods, where generators are fullyresponsible to cover the embedded cost. It proposes a method to determine the cost allocation of transmission usage based on decomposition through the superposition techinique to determine power flow contributions from an integrated base case of the results of the power flow calculations of all transactions, bilateral and nonbilateral contracts. Mathematically, the applied formulations are illustrated clearly in this paper. The proposed method has been tested with 5-bus system and the results are much different compared to a few of the published methods. This is shown by the test results on the 5 bus system. The published methods produce total power flow contributions in each line is greater than the actual. And they earn total revenues approximately 11.6% greater than the embedded cost. While on the proposed method, the power flow contribu tions are equal to the actual and the revenues are equal to the embedded cost. It shows also that the proposed method gives results as expected.

  16. Electricity for road transport, flexible power systems and wind power

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Lars Henrik; Ravn, H.; Meibom, P. (and others)

    2011-12-15

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles. The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle connection systems including technical regulation options and analysis of needs for standardisation. 4: Setting up scenarios covering potential developments for utilizing electric drive trains in road transport. Period: Up to year 2030. 5: Analysis of capacity constraints in the electricity grid (transmission and distribution) as consequence of increasing electricity demand, and new flexible consumption patterns from segments in the transport sector, and as consequence of increasing capacity on wind power in the system. 6: Setting up and analysis of combined scenarios covering both the heat and power system and the transport sector. (Author)

  17. Comprehensive evaluation of power grid projects' investment benefits under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Ling, Yunpeng

    2017-03-01

    On March 15, 2015, the Central Office issued the "Opinions on Further Deepening the Reform of Electric Power System" (Zhong Fa No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid projects' investment benefits under the reform of transmission and distribution price to improve the investment efficiency of power grid projects after the power reform in China.

  18. EVALUATING DEGREE OF ACTIVE POWER LOSSES REDUCTION IN THE ELECTRIC POWER LINES WITH REACTIVE POWER COMPENSATION

    Directory of Open Access Journals (Sweden)

    V. N. Radkevich

    2016-01-01

    Full Text Available The paper considers evaluation procedure for the degree of active power losses reduction in the power transmission lines under 1 kV and 6–10 kV of the systems of electric power supply of industrial enterprises with compensating installations mounted at the side of the customer. The capacitor installations conform to the applied voltage level and factor in dielectric losses in the capacitors. The voltage at the compensating device terminal changes from 0.95 to 1.05 of the capacitors nominal voltage. The study did not account for reactive power losses in the line, nor did it for its charge capacity, conditioned by relative shortness of the cable lines generally operating in the mains of industrial enterprises. For this reason, the quantities of reactive power being consumed and generated by the transmission line are negligible and do not significantly affect the reactive power flux. The researchers obtain functional relations that allow estimating the degree of power loss reduction in the transmission line factoring in its explicit initial data. They perform mathematical analysis of the obtained functional relations and study the function by means of derivatives. The function extremum points are found as well as the intervals of its increment and decrement. A graphical research of the obtained functional relation is performed. It is ascertained that reduction of the active power losses is contingent on the line and the capacitor-installation engineering factors, the electrical energy consumer reactive load value as well as the voltage applied to the capacitor installation. The functional relations presented in the article can be employed in scoping calculation necessary for decision making on the reactive power compensation in systems of the industrial facilities electric power supply. Their account will allow a more accurate estimate of technical and economic effect of the capacitor bank installation in the electrical mains under 1 kV and 6

  19. Transmission tariffs based on optimal power flow

    International Nuclear Information System (INIS)

    Wangensteen, Ivar; Gjelsvik, Anders

    1998-01-01

    This report discusses transmission pricing as a means of obtaining optimal scheduling and dispatch in a power system. This optimality includes consumption as well as generation. The report concentrates on how prices can be used as signals towards operational decisions of market participants (generators, consumers). The main focus is on deregulated systems with open access to the network. The optimal power flow theory, with demand side modelling included, is briefly reviewed. It turns out that the marginal costs obtained from the optimal power flow gives the optimal transmission tariff for the particular load flow in case. There is also a correspondence between losses and optimal prices. Emphasis is on simple examples that demonstrate the connection between optimal power flow results and tariffs. Various cases, such as open access and single owner are discussed. A key result is that the location of the ''marketplace'' in the open access case does not influence the net economical result for any of the parties involved (generators, network owner, consumer). The optimal power flow is instantaneous, and in its standard form cannot deal with energy constrained systems that are coupled in time, such as hydropower systems with reservoirs. A simplified example of how the theory can be extended to such a system is discussed. An example of the influence of security constraints on prices is also given. 4 refs., 24 figs., 7 tabs

  20. Topics on Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  1. Topics in Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  2. Topics on Electricity Transmission Pricing

    International Nuclear Information System (INIS)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy Directorate (NVE). To prevent cross

  3. Power exchange game in the electricity market

    International Nuclear Information System (INIS)

    Pyykko, S.; Partanen, J.; Viljainen, S.; Lassila, J.; Honkapuro, S.; Tahvanainen, K.

    2006-01-01

    Since it is not economically reasonable to build parallel electricity networks, in Finland, Sweden, Norway and Denmark, electricity distribution is protected by monopoly. However, electricity production and selling have been opened up to competition by connecting the transmission networks of these countries together, and it is possible to produce electricity where it is cheapest. A common electricity power market, called Nord Pool, has been created where electricity can be bought, sold or used as an exchange product. In order to help students understand the operation of electricity markets and the use of different electricity exchange products, the Department of Electrical Engineering at Lappeenranta University developed a scheme in which the theory can be used in practice. In the scheme, students are given the responsibility to manage the electricity markets of power companies in order analyze, plan and make decisions, which are skills required on the open power markets. The paper provided an introduction to the electricity markets in Nordic countries and discussed Nord Pool and its products. Information about education at the Department of Electrical Engineering at Lappeenranta University of Technology was also presented. The paper also provided details of the power exchange scheme on the electricity markets. 6 refs., 17 figs

  4. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    Yomi

    2010-08-18

    Aug 18, 2010 ... transmission lines on ornamental plant growth. Zeki Demir ... The effects of proximity to power-line on specific leaf area and seedling dbh were tested .... during vegetation season is about 72% and common wind blow.

  5. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  6. Development of a model for integrated simulation of the European transmission networks and electricity markets

    International Nuclear Information System (INIS)

    Rathke, Christian

    2013-01-01

    The liberalisation of electricity markets and the increase of renewable energy generation actually causes dramatic changes for the whole European power industry. The transmission system operators in particular have to meet the challenge to ensure a stable and reliable system operation in the future. Significant changes in power generation will require a substantial extension to current inadequate original transmission grids to handle increased wide area power flows. This is the only way to avoid overloading the grid and to reduce the herefrom resulting limitations for the Pan-European cross-border trade of electricity. This work describes in detail the development of a Pan-European integrated grid and an electricity market simulation tool. For this purpose an overview about the today's structure of the European electricity industry is given initially. Afterwards the configuration of the transmission grid, the used equipment and different methods for the load flow and short circuit calculation are explained. Furthermore models for the calculation of local loads and the power plant dispatch are presented in the following chapters. Following on from this a detailed model of the European electricity industry is developed and the main functions are described by means of some exemplary simulations. The simulation tool developed in this work enables the user to calculate realistic power plant schedules and the consequent resulting physical effects on the European transmission grid. It combines a time series based simulation of the electricity market with a detailed model of the transmission grid. The highly detailing of the model offers the feasibility to execute a complete AC load flow calculation using the Newton Raphson algorithm.Therefore it is possible to identify the active as well as the reactive power flows in the grid. The results of the power flow calculation are the basis for further investigations (e. g. the short circuit calculation) and to decide on

  7. A cooperative game theory approach to transmission planning in power systems

    Science.gov (United States)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  8. Analysis of Power Network for Line Reactance Variation to Improve Total Transmission Capacity

    Directory of Open Access Journals (Sweden)

    Ikram Ullah

    2016-11-01

    Full Text Available The increasing growth in power demand and the penetration of renewable distributed generations in competitive electricity market demands large and flexible capacity from the transmission grid to reduce transmission bottlenecks. The bottlenecks cause transmission congestion, reliability problems, restrict competition, and limit the maximum dispatch of low cost generations in the network. The electricity system requires efficient utilization of the current transmission capability to improve the Available Transfer Capability (ATC. To improve the ATC, power flow among the lines can be managed by using Flexible AC Transmission System (FACTS devices as power flow controllers, which alter the parameters of power lines. It is important to place FACTS devices on suitable lines to vary the reactance for improving Total Transmission Capacity (TTC of the network and provide flexibility in the power flow. In this paper a transmission network is analyzed based on line parameters variation to improve TTC of the interconnected system. Lines are selected for placing FACTS devices based on real power flow Performance Index (PI sensitivity factors. TTC is computed using the Repeated Power Flow (RPF method using the constraints of lines thermal limits, bus voltage limits and generator limits. The reactance of suitable lines, selected on the basis of PI sensitivity factors are changed to divert the power flow to other lines with enough transfer capacity available. The improvement of TTC using line reactance variation is demonstrated with three IEEE test systems with multi-area networks. The results show the variation of the selected lines’ reactance in improving TTC for all the test networks with defined contingency cases.

  9. Efficiency of Finish power transmission network companies

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The Finnish Energy Market Authority has investigated the efficiency of power transmissions network companies. The results show that the intensification potential of the branch is 402 million FIM, corresponding to about 15% of the total costs of the branch and 7.3 % of the turnout. Energy Market Authority supervises the reasonableness of the power transmission prices, and it will use the results of the research in supervision. The research was carried out by the Quantitative Methods Research Group of Helsinki School of Economics. The main objective of the research was to create an efficiency estimation method for electric power distribution network business used for Finnish conditions. Data of the year 1998 was used as basic material in the research. Twenty-one of the 102 power distribution network operators was estimated to be totally efficient. Highest possible efficiency rate was 100, and the average of the efficiency rates of all the operators was 76.9, the minimum being 42.6

  10. Proceedings of the CERI 2003 electricity conference : electricity restructuring in transition. CD-ROM ed.

    International Nuclear Information System (INIS)

    2003-01-01

    The restructuring of the electric power industry was reviewed from a North American perspective. This conference focused on how current market structures can be improved to benefit all participants. The current issues for future development of power generation and transmission were discussed. The conference was divided into seven sessions as follows: (1) market design issues, (2) Federal Energy Regulatory Commission's (FERC's) wholesale market platform, (3) does retail competition make sense, (4) the future direction of the Alberta market, (5) the status of restructured electricity markets, (6) resource mix in a greenhouse gas (GHG)-constrained world, and (7) electricity supply from oil sands cogeneration. A total of eleven papers were selected and indexed separately for inclusion in this database. refs., tabs., figs

  11. The economics and environmental impacts of large-scale wind power in a carbon constrained world

    Science.gov (United States)

    Decarolis, Joseph Frank

    Serious climate change mitigation aimed at stabilizing atmospheric concentrations of CO2 will require a radical shift to a decarbonized energy supply. The electric power sector will be a primary target for deep reductions in CO2 emissions because electric power plants are among the largest and most manageable point sources of emissions. With respect to new capacity, wind power is currently one of the most inexpensive ways to produce electricity without CO2 emissions and it may have a significant role to play in a carbon constrained world. Yet most research in the wind industry remains focused on near term issues, while energy system models that focus on century-long time horizons undervalue wind by imposing exogenous limits on growth. This thesis fills a critical gap in the literature by taking a closer look at the cost and environmental impacts of large-scale wind. Estimates of the average cost of wind generation---now roughly 4¢/kWh---do not address the cons arising from the spatial distribution and intermittency of wind. This thesis develops a theoretical framework for assessing the intermittency cost of wind. In addition, an economic characterization of a wind system is provided in which long-distance electricity transmission, storage, and gas turbines are used to supplement variable wind power output to meet a time-varying load. With somewhat optimistic assumptions about the cost of wind turbines, the use of wind to serve 50% of demand adds ˜1--2¢/kWh to the cost of electricity, a cost comparable to that of other large-scale low carbon technologies. This thesis also explores the environmental impacts posed by large-scale wind. Though avian mortality and noise caused controversy in the early years of wind development, improved technology and exhaustive siting assessments have minimized their impact. The aesthetic valuation of wind farms can be improved significantly with better design, siting, construction, and maintenance procedures, but opposition may

  12. An Optimal Domestic Electric Vehicle Charging Strategy for Reducing Network Transmission Loss While Taking Seasonal Factors into Consideration

    Directory of Open Access Journals (Sweden)

    Yuancheng Zhao

    2018-01-01

    Full Text Available With the rapid growth of domestic electric vehicle charging loads, the peak-valley gap and power fluctuation rate of power systems increase sharply, which can lead to the increase of network losses and energy efficiency reduction. This paper tries to regulate network loads and reduce power system transmission loss by optimizing domestic electric vehicle charging loads. In this paper, a domestic electric vehicle charging loads model is first developed by analyzing the key factors that can affect users’ charging behavior. Subsequently, the Monte Carlo method is proposed to simulate the power consumption of a cluster of domestic electric vehicles. After that, an optimal electric vehicle charging strategy based on the 0-1 integer programming is presented to regulate network daily loads. Finally, by taking the IEEE33 distributed power system as an example, this paper tries to verify the efficacy of the proposed optimal charging strategy and the necessity for considering seasonal factors when scheduling electric vehicle charging loads. Simulation results show that the proposed 0-1 integer programming method does have good performance in reducing the network peak-valley gap, voltage fluctuation rate, and transmission loss. Moreover, it has some potential to further reduce power system transmission loss when seasonal factors are considered.

  13. Integrated powertrain control for hybrid electric vehicles with electric variable transmission

    NARCIS (Netherlands)

    Kessels, J.T.B.A.; Foster, D.L.; Bosch, van den P.P.J.

    2009-01-01

    The electric variable transmission (EVT) offers a powersplit for hybrid electric vehicles by integrating two motor/ generator sets into one electric machine. This double rotor concept implements a continuously variable transmission between the engine and the driveline, including the possibility for

  14. Impacts of demand response and renewable generation in electricity power market

    Science.gov (United States)

    Zhao, Zhechong

    This thesis presents the objective of the research which is to analyze the impacts of uncertain wind power and demand response on power systems operation and power market clearing. First, in order to effectively utilize available wind generation, it is usually given the highest priority by assigning zero or negative energy bidding prices when clearing the day-ahead electric power market. However, when congestion occurs, negative wind bidding prices would aggravate locational marginal prices (LMPs) to be negative in certain locations. A load shifting model is explored to alleviate possible congestions and enhance the utilization of wind generation, by shifting proper amount of load from peak hours to off peaks. The problem is to determine proper amount of load to be shifted, for enhancing the utilization of wind generation, alleviating transmission congestions, and making LMPs to be non-negative values. The second piece of work considered the price-based demand response (DR) program which is a mechanism for electricity consumers to dynamically manage their energy consumption in response to time-varying electricity prices. It encourages consumers to reduce their energy consumption when electricity prices are high, and thereby reduce the peak electricity demand and alleviate the pressure to power systems. However, it brings additional dynamics and new challenges on the real-time supply and demand balance. Specifically, price-sensitive DR load levels are constantly changing in response to dynamic real-time electricity prices, which will impact the economic dispatch (ED) schedule and in turn affect electricity market clearing prices. This thesis adopts two methods for examining the impacts of different DR price elasticity characteristics on the stability performance: a closed-loop iterative simulation method and a non-iterative method based on the contraction mapping theorem. This thesis also analyzes the financial stability of DR load consumers, by incorporating

  15. Non-contact magnetic coupled power and data transferring system for an electric vehicle

    International Nuclear Information System (INIS)

    Matsuda, Y.; Sakamoto, H.

    2007-01-01

    We have developed a system which transmits electric power and communication data simultaneously in a non-contact method using a magnetic coupling coil. Already, we are developing the fundamental technology of a non-contact charging system, and this is applied in electric shavers, electric toothbrushes, etc. Moreover, basic experiments are being conducted for applying this non-contact charging system to electric equipments such as an electric vehicle (EV), which is a zero emission vehicle and environmentally excellent and will be the transportation means of the next generation. The technology can also be applied in other electronic equipment, etc. However, since the power supply route for these individual devices is independent, the supply system is complicated. EV also has to perform the transmission of electric power and the transmission of information (data), such as the amount of the charge, in a separate system, and thus is quite complicated. In this study, by performing simultaneously the transmission of electric power and information (data) using magnetic coupling technology in which it does not contact, the basic experiment aimed at attaining and making unification of a system simple was conducted, and the following good results were obtained: (1) Electric power required for load can be transmitted easily by non-contact. (2) A signal can easily be transmitted bidirectionally by non-contact. (3) This system is reliable, and is widely applicable

  16. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  17. Optimal pricing of transmission and distribution services in electricity supply

    International Nuclear Information System (INIS)

    Farmer, E.D.; Cory, B.J.; Perera, B.L.P.P.

    1995-01-01

    A new strategy for the separate pricing of transmission and distribution services in electricity supply is formulated and evaluated. The proposed methodology is a multivariate transmission generalisation of the method of peak load pricing previously applied to the optimal time-of-use pricing of generation on a power system with diverse generation technologies and with elastic demand. The method allocates both capacity and operational costs on a time-of-use basis, in an optimal manner, that avoids cross-subsidisation both between differing supply system participants and differing times of usage. The method is shown to promote the optimal development of the transmission, distribution or interconnecting systems, rewarding justified investments in transmission capacity and discouraging overinvestment. It also leads to appropriate returns on invested capital without significant 'revenue reconciliation'. This contrasts with SRMC pricing as is shown by a comparative revenue evaluation. It is concluded that the method has wide potential application in electricity supply. (author)

  18. A simple two stage optimization algorithm for constrained power economic dispatch

    International Nuclear Information System (INIS)

    Huang, G.; Song, K.

    1994-01-01

    A simple two stage optimization algorithm is proposed and investigated for fast computation of constrained power economic dispatch control problems. The method is a simple demonstration of the hierarchical aggregation-disaggregation (HAD) concept. The algorithm first solves an aggregated problem to obtain an initial solution. This aggregated problem turns out to be classical economic dispatch formulation, and it can be solved in 1% of overall computation time. In the second stage, linear programming method finds optimal solution which satisfies power balance constraints, generation and transmission inequality constraints and security constraints. Implementation of the algorithm for IEEE systems and EPRI Scenario systems shows that the two stage method obtains average speedup ratio 10.64 as compared to classical LP-based method

  19. Major trends in the development of electrical power systems

    Energy Technology Data Exchange (ETDEWEB)

    Syromyatnikov, I A

    1965-01-01

    The comparison is made between the USA and the USSR electrical systems and their growth. The author states that USSR is about 35 years behind in the construction of power transmission lines of 22 kV and above. Various graphs of economic developments are presented. It is stated that the work in the near future should be concentrated on 750 kV network and on combining the USSR electric power distribution into a single power system.

  20. Issues affecting the electricity transmission system in Mexico under a competitive integrated model

    Energy Technology Data Exchange (ETDEWEB)

    Avila Rosales, M.A.; Gonzalez Flores, J. [Federal Electricity Commission, Mexico City (Mexico)

    2008-07-01

    The electricity sector in Mexico is undergoing a process of significant structural change. The traditional industry framework has been exposed to new market structures and greater competition, both of which are being introduced by changing regulations regarding who can generate, transmit, distribute and sell electricity. Mexico's power industry is changing to a competitive integrated model. Electricity industry restructuring is partly based on the assumption that transmission systems should be flexible, reliable, and open to all exchanges no matter where the suppliers and consumers of energy are located and who they are. However, neither the existing transmission systems nor its management infrastructure can fully support this open exchange. This paper described the primary issues affecting the transmission system in Mexico under a competitive environment and a transmission expansion planning approach that took the uncertainties associated with the location and size of new generating power stations into consideration in order to produce least-cost and robust transmission plans. The paper described the planning process, including a rigorous analysis of the economics of the resulting transmission plans. Specifically, the paper described the current regulatory framework and supply adequacy as well as current procedures and methodologies for transmission management and expansion planning. The transmission planning methodology was also presented. This included a minimum cost analysis; profit analysis; and least-cost transmission plan. It was concluded that the transmission expansion planning approach stressed that a horizon year viewpoint was important because transmission additions have long-term use. The transmission expansion planning approach, further defined the process of selecting transmission projects as one of comparing and optimizing attributes such as near-term needs; long-term utilization; contribution to overall reliability; and favorable or least

  1. Comprehensive evaluation of power grid enterprises' credit rating under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Wei, Jiaxiang

    2017-03-01

    On March 15, 2015, the central office issued the "Opinions on Further Deepening the Reform of Electric Power System" (in the 2015 No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid enterprises' credit rating under the reform of transmission and distribution price to reduce the impact of the reform on the company's international rating results and the ability to raise funds.

  2. Electric Power Consumption Coefficients for U.S. Industries: Regional Estimation and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Boero, Riccardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-21

    Economic activity relies on electric power provided by electrical generation, transmission, and distribution systems. This paper presents a method developed at Los Alamos National Laboratory to estimate electric power consumption by different industries in the United States. Results are validated through comparisons with existing literature and benchmarking data sources. We also discuss the limitations and applications of the presented method, such as estimating indirect electric power consumption and assessing the economic impact of power outages based on input-output economic models.

  3. Electric power supply and demand for the contiguous United States, 1980-1989

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    A limited review is presented of the outlook for the electric power supply and demand during the period 1980 to 1989. Only the adequacy and reliability aspects of bulk electric power supply in the contiguous US are considered. The economic, financial and environmental aspects of electric power system planning and the distribution of electricity (below the transmission level) are topics of prime importance, but they are outside the scope of this report.

  4. New record in import of electric power in 2000

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    In spite of the mild weather in the year 2000 the electric power consumption in Finland increased by nearly 2%. The electric power consumption would be twice as high if the temperatures would have been the same as usually. Hydroelectric power generation in Norway, Sweden and Finland in 2000 was about 40 TWh higher than in 1999. The retained import of electric power in the year 2000 reached a new record, being 11.9 TWh, corresponding to 15% of the annual power consumption in Finland. The GNP in Finland increased in 2000 by 5.7%, and the estimate for 2001 is 4.5%. Total power consumption in Finland in 2000 was 79.1 TWh, which is 1.7% higher than in 1999. About 60% of the increase were covered by import of electric power and 40 % by increasing own power generation. The share of CHP production was 31% of the total power consumption, the share of nuclear power being 27%, the share of hydroelectric power 18% and that of coal and other common condensing power about 8%. The share of retained electric power import was 15%. The Finnish hydroelectric power plants generated 14.4 TWh electric power, which is nearly 15% more than in 1999. Due to the increased production of hydroelectric power and power import the production of coal and other condensing power decreased nearly 9%. The wind power generation increased rapidly being, however, only about 0.1% of the electric power consumption. Industrial power consumption was about 55% of the total, the share of households and agriculture being nearly 24%, and those of services and public sector over 17%. Power transmission and delivery losses were less than 4%. The electric power consumption of households decreased by nearly 2% due to the worm end of the year. The share of other consumers increased by nearly 3%. About 13 000 households acquired electric heating, so the number of electrically heated houses in Finland is 593 000 households. The industrial electric power consumption increased in 2000 by 2.7% up to 43.2 TWh. The share of

  5. Partial analysis of wind power limit in an electric micro system using continuation power flow

    International Nuclear Information System (INIS)

    Fiallo Guerrero, Jandry; Santos Fuentefria, Ariel; Castro Fernández, Miguel

    2013-01-01

    The wind power insertion in the power system is an important issue and can create some instability problems in voltage and system frequency due to stochastic origin of wind. Know the Wind Power Limit that can insert in an electric grid without losing stability is a very important matter. Existing in bibliography a few methods for calculation of wind power limit, some of them are based in static constrains, an example is a method based in a continuation power flow analysis. In the present work the method is applied in an electric micro system formed when the system is disconnected of the man grid, the main goal was prove the method in a weak and island network. The software used in the simulations was the Power System Analysis Toolbox (PSAT). (author)

  6. Electricity in a Climate-Constrained World

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    After experiencing a historic drop in 2009, electricity generation reached a record high in 2010, confirming the close linkage between economic growth and electricity usage. Unfortunately, CO2 emissions from electricity have also resumed their growth: Electricity remains the single-largest source of CO2 emissions from energy, with 11.7 billion tonnes of CO2 released in 2010. The imperative to 'decarbonise' electricity and improve end-use efficiency remains essential to the global fight against climate change. The IEA’s Electricity in a Climate-Constrained World provides an authoritative resource on progress to date in this area, including statistics related to CO2 and the electricity sector across ten regions of the world (supply, end-use and capacity additions). It also presents topical analyses on the challenge of rapidly curbing CO2 emissions from electricity. Looking at policy instruments, it focuses on emissions trading in China, using energy efficiency to manage electricity supply crises and combining policy instruments for effective CO2 reductions. On regulatory issues, it asks whether deregulation can deliver decarbonisation and assesses the role of state-owned enterprises in emerging economies. And from technology perspectives, it explores the rise of new end-uses, the role of electricity storage, biomass use in Brazil, and the potential of carbon capture and storage for ‘negative emissions’ electricity supply.

  7. Proceedings of the CERI 2006 electricity conference : the challenges of powering Canada's growth

    International Nuclear Information System (INIS)

    2006-01-01

    Decision makers in the electric power industry face continuing challenges regarding changes in electricity market mechanisms, pricing options, and power generation and transmission alternatives. This conference provided an opportunity to review energy markets in North American with particular reference to supply and demand. Opportunities for traditional or new generation technologies based on renewable energy sources including wind powered generation were discussed. The presentations focused on transmission issues, market design and capacity issues as well as market power and pricing. The integration of wind energy into the power grid as a measure to diversify the power generation portfolio in North America was also discussed along with hydrothermal synergies and interconnections. The sessions of the conference were entitled: future generation and market operations in Canada; risks, challenges and opportunities for transmission in Canada; wind power and system integration issues; the role of consumers and demand side management in Canada; cogeneration in Alberta and Canada; and, regulatory issues in Canadian electricity markets. The conference featured 25 presentations, of which 10 have been catalogued separately for inclusion in this database. tabs., figs

  8. A literature survey on asset management in electrical power [transmission and distribution] system

    NARCIS (Netherlands)

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on

  9. Connecting Colorado's Renewable Resources to the Markets in a Cabon-Constrained Electricity Sector

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-12-31

    The benchmark goal that drives the report is to achieve a 20 percent reduction in carbon dioxide (CO{sub 2}) emissions in Colorado's electricity sector below 2005 levels by 2020. We refer to this as the '20 x 20 goal.' In discussing how to meet this goal, the report concentrates particularly on the role of utility-scale renewable energy and high-voltage transmission. An underlying recognition is that any proposed actions must not interfere with electric system reliability and should minimize financial impacts on customers and utilities. The report also describes the goals of Colorado's New Energy Economy5 - identified here, in summary, as the integration of energy, environment, and economic policies that leads to an increased quality of life in Colorado. We recognize that a wide array of options are under constant consideration by professionals in the electric industry, and the regulatory community. Many options are under discussion on this topic, and the costs and benefits of the options are inherently difficult to quantify. Accordingly, this report should not be viewed as a blueprint with specific recommendations for the timing, siting, and sizing of generating plants and high-voltage transmission lines. We convened the project with the goal of supplying information inputs for consideration by the state's electric utilities, legislators, regulators, and others as we work creatively to shape our electricity sector in a carbon-constrained world. The report addresses various issues that were raised in the Connecting Colorado's Renewable Resources to the Markets report, also known as the SB07-91 Report. That report was produced by the Senate Bill 2007-91 Renewable Resource Generation Development Areas Task Force and presented to the Colorado General Assembly in 2007. The SB07-91 Report provided the Governor, the General Assembly, and the people of Colorado with an assessment of the capability of Colorado's utility-scale renewable

  10. The TC-PSI indicator for forecasting the potential for market power in wholesale electricity markets

    International Nuclear Information System (INIS)

    Hesamzadeh, Mohammad R.; Biggar, Darryl R.; Hosseinzadeh, Nasser

    2011-01-01

    Wholesale electricity market regulators have long sought a simple, reliable, transparent indicator of the likely impact of wholesale market developments on the exercise of market power. Conventional indicators, such as the Pivotal Supplier Indicator (PSI) and the Residual Supply Index (RSI) cannot be extended to apply to meshed transmission networks, especially when generating companies hold a portfolio of generating units at different locations on the network. This paper proposes a generalisation of these standard measures termed the 'Transmission-Constrained Pivotal Supplier Indicator (TC-PSI)'. The TC-PSI of a generating company is defined as the maximum must-run generation for any subset of generating plant while allowing for strategic operation of other plant in the portfolio. We illustrate the use of the TC-PSI using a five-node model of the Australian NEM. - Highlights: → An indicator for assessing the pivotality of generating portfolios is proposed. → Transmission constraints are modelled explicitly in the proposed indicator. → Strategic behaviours of a generating portfolio in using its units are modelled. → This approach was illustrated using a 5-node model of the Australian NEM.

  11. Integration of electric drive vehicles in the Danish electricity network with high wind power penetration

    DEFF Research Database (Denmark)

    Chandrashekhara, Divya K; Østergaard, Jacob; Larsen, Esben

    2010-01-01

    /conventional) which are likely to fuel these cars. The study was carried out considering the Danish electricity network state around 2025, when the EDV penetration levels would be significant enough to have an impact on the power system. Some of the interesting findings of this study are - EDV have the potential......This paper presents the results of a study carried out to examine the feasibility of integrating electric drive vehicles (EDV) in the Danish electricity network which is characterised by high wind power penetration. One of the main aims of this study was to examine the effect of electric drive...... vehicles on the Danish electricity network, wind power penetration and electricity market. In particular the study examined the effect of electric drive vehicles on the generation capacity constraints, load curve, cross border transmission capacity and the type of generating sources (renewable...

  12. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  13. Unbundling generation and transmission services for competitive electricity markets

    International Nuclear Information System (INIS)

    Hirst, E.; Kirby, B.

    1998-01-01

    Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those 'necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.' The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC's landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that

  14. Network cost in transmission and distribution of electric power

    International Nuclear Information System (INIS)

    Lindahl, A.; Naeslund, B.; Oettinger-Biberg, C.; Olander, H.; Wuolikainen, T.; Fritz, P.

    1994-01-01

    This report is divided in two parts, where part 1 treats the charges on the regional nets with special emphasis on the net owners tariffs on a deregulated market. Part 2 describes the development of the network costs in electric power distribution for the period 1991-1993. 11 figs, 33 tabs

  15. A data seamless interaction scheme between electric power secondary business systems

    Science.gov (United States)

    Ai, Wenkai; Qian, Feng

    2018-03-01

    At present, the data interaction of electric power secondary business systems is very high, and it is not universal to develop programs when data interaction is carried out by different manufacturers' electric power secondary business systems. There are different interaction schemes for electric power secondary business systems with different manufacturers, which lead to high development cost, low reusability and high maintenance difficulty. This paper introduces a new data seamless interaction scheme between electric power secondary business systems. The scheme adopts the international common Java message service protocol as the transmission protocol, adopts the common JavaScript object symbol format as the data interactive format, unified electric power secondary business systems data interactive way, improve reusability, reduce complexity, monitor the operation of the electric power secondary business systems construction has laid a solid foundation.

  16. HVDC power transmission technology assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  17. A framework for cost-based pricing of transmission and ancillary services in competitive electric power markets

    International Nuclear Information System (INIS)

    Zobian, A.; Ilic, M.D.

    1995-01-01

    In this paper the authors propose a framework for accurate cost determination and pricing of transmission and ancillary services in competitive electric power markets. The proposed framework is based on their anticipation of the evolving environment and industry structure. They envision the future as a competitive energy market with a centralized control entity that coordinates system activities, prices transmission and ancillary services and controls various system resources. This control entity has control over a certain (pre-defined) geographical area. It is proposed that the system operation and control be kept as they are currently done in control centers, no major change in these functions is required for the proposed pricing strategy. The pricing strategy is divided into two main classes based on time scale separation and firmness, short and long term, firm and interruptible contracts. The approach is based on superposition of different transaction on the network, and a three-part tariff design. The charges are directly related to the impact of each transaction on the system

  18. Cap-and-Trade Modeling and Analysis: Congested Electricity Market Equilibrium

    Science.gov (United States)

    Limpaitoon, Tanachai

    This dissertation presents an equilibrium framework for analyzing the impact of cap-and-trade regulation on transmission-constrained electricity market. The cap-and-trade regulation of greenhouse gas emissions has gained momentum in the past decade. The impact of the regulation and its efficacy in the electric power industry depend on interactions of demand elasticity, transmission network, market structure, and strategic behavior of firms. I develop an equilibrium model of an oligopoly electricity market in conjunction with a market for tradable emissions permits to study the implications of such interactions. My goal is to identify inefficiencies that may arise from policy design elements and to avoid any unintended adverse consequences on the electric power sector. I demonstrate this modeling framework with three case studies examining the impact of carbon cap-and-trade regulation. In the first case study, I study equilibrium results under various scenarios of resource ownership and emission targets using a 24-bus IEEE electric transmission system. The second and third case studies apply the equilibrium model to a realistic electricity market, Western Electricity Coordinating Council (WECC) 225-bus system with a detailed representation of the California market. In the first and second case studies, I examine oligopoly in electricity with perfect competition in the permit market. I find that under a stringent emission cap and a high degree of concentration of non-polluting firms, the electricity market is subject to potential abuses of market power. Also, market power can occur in the procurement of non-polluting energy through the permit market when non-polluting resources are geographically concentrated in a transmission-constrained market. In the third case study, I relax the competitive market structure assumption of the permit market by allowing oligopolistic competition in the market through a conjectural variation approach. A short-term equilibrium

  19. Space power transmission

    Energy Technology Data Exchange (ETDEWEB)

    Kuribayashi, Shizuma [Mitsubishi Heavy Industries, Ltd., Tokyo, (Japan)

    1989-10-05

    There being a conception to utilize solar energy by use of a space power station (SPS), a method to bring that universal grace to mankind is wireless energy transmission. The wireless energy transmission is regarded to be microwave transmission or laser beam transmission. The microwave transmission is to transmit 2.45GHz band microwave from the SPS to a receiving station on the ground to meet power demand on earth. The microwave, as small in attenuation in atmosphere and resistant against rain and cloud, is made candidate and, however, problematic in influence on organism, necessary large area of receiving antenna and many other points to be studied. While the laser transmission, as more convergent of beam than the microwave transmission, is advantageous with enabling the receiving area to be small and, however, disadvantageous with being not resistant against dust, rain and cloud, if used for the energy transmission between the space and earth. 2 refs., 2 figs.

  20. 76 FR 20651 - Application To Export Electric Energy; Cargill Power Markets, LLC

    Science.gov (United States)

    2011-04-13

    ... application. SUMMARY: Cargill Power Markets, LLC (CPM) has applied for authority to transmit electric energy... the FPA (16 U.S.C. 824a(e)). On March 22, 2011, DOE received an application from CPM for authority to... international transmission facilities. CPM does not own any electric transmission facilities nor does it hold a...

  1. Overview of FACTS devices for wind power plants directly connected to the transmission network

    DEFF Research Database (Denmark)

    Adamczyk, Andrzej Grzegorz; Teodorescu, Remus; Rodriguez, Pedro

    2010-01-01

    Growing number of wind turbines is changing electricity generation profile all over the world. This brings challenges for power system operation, which was designed and developed around conventional power plants with directly coupled synchronous generators. In result, safety and stability...... of the electrical network with high wind energy penetration might be compromised. For this reason transmission system operators (TSO) impose more stringent connection requirements on the wind power plant (WPP) owners. On the other hand flexible AC transmission systems (FACTS) devices offer enhancement of grid...... research in FACTS applicability for WPPs is summarized. Examples of few existing FACTS applications for wind farms are given....

  2. Scenarios for low carbon and low water electric power plant ...

    Science.gov (United States)

    In the water-energy nexus, water use for the electric power sector is critical. Currently, the operational phase of electric power production dominates the electric sector's life cycle withdrawal and consumption of fresh water resources. Water use associated with the fuel cycle and power plant equipment manufacturing phase is substantially lower on a life cycle basis. An outstanding question is: how do regional shifts to lower carbon electric power mixes affect the relative contribution of the upstream life cycle water use? To test this, we examine a range of scenarios comparing a baseline with scenarios of carbon reduction and water use constraints using the MARKet ALlocation (MARKAL) energy systems model with ORD's 2014 U.S. 9-region database (EPAUS9r). The results suggest that moving toward a low carbon and low water electric power mix may increase the non-operational water use. In particular, power plant manufacturing water use for concentrating solar power, and fuel cycle water use for biomass feedstock, could see sharp increases under scenarios of high deployment of these low carbon options. Our analysis addresses the following questions. First, how does moving to a lower carbon electricity generation mix affect the overall regional electric power water use from a life cycle perspective? Second, how does constraining the operational water use for power plants affect the mix, if at all? Third, how does the life cycle water use differ among regions under

  3. Nuclear power's effects on electric rate making

    International Nuclear Information System (INIS)

    Smith, D.S.; Lancaster, A.A.

    1978-01-01

    Government and the electric utility industry are re-evaluating nuclear power's contribution to the total U.S. energy supplies. This article addresses how the recently increased nuclear plant construction and operation costs are translated into the prices that consumers pay for electricity. The electric rates that consumers pay must reflect the costs of producing electricity, as well as the costs of transmission, distribution, metering, and billing. The use of nuclear power for electric production is anticipated to grow rapidly so as to meet a larger portion of our country's electricity needs through the end of the century; so nuclear power costs are expected to be an even larger portion of the total electricity price. There are certain rate-making issues that are actively being discussed in public forums and before state and Federal regulatory bodies. These issues are not unique to nuclear power, but take on added significance when nuclear power is used by utilities to produce electricity because of the technology required and because of the type, timing, and magnitude of the costs involved. These are: (1) inclusion of construction work in progress in the rate base; (2) fuel adjustment clauses and treatment of nuclear fuel cycle costs; (3) treatment of certain taxes under the rate-making method called normalization or deferral accounting (sometimes referred to as ''phantom taxes''); and (4) rate treatment for particular nuclear expense items reflecting costs of delays, plant cancellations, and operational slowdowns

  4. Insulation co-ordination in high-voltage electric power systems

    CERN Document Server

    Diesendorf, W

    2015-01-01

    Insulation Co-ordination in High-Voltage Electric Power Systems deals with the methods of insulation needed in different circumstances. The book covers topics such as overvoltages and lightning surges; disruptive discharge and withstand voltages; self-restoring and non-self-restoring insulation; lightning overvoltages on transmission lines; and the attenuation and distortion of lightning surges. Also covered in the book are topics such as the switching surge designs of transmission lines, as well as the insulation coordination of high-voltage stations. The text is recommended for electrical en

  5. Variable Ratio Hydrostatic Transmission Simulator for Optimal Wind Power Drivetrains

    Directory of Open Access Journals (Sweden)

    Jose M. Garcia-Bravo

    2017-01-01

    Full Text Available This work presents a hydromechanical transmission coupled to an electric AC motor and DC generator to simulate a wind power turbine drive train. The goal of this project was to demonstrate and simulate the ability of a hydrostatic variable ratio system to produce constant electric power at varying wind speeds. The experimental results show that the system can maintain a constant voltage when a 40% variation in input speed is produced. An accompanying computer simulation of the system was built and experimentally validated showing a discrete error no larger than 12%. Both the simulation and the experimental results show that the electrical power output can be regulated further if an energy storage device is used to absorb voltage spikes produced by abrupt changes in wind speed or wind direction.

  6. Terminological dictionary of electrical power industry in range of generation, transmission and distribution of electric energy

    International Nuclear Information System (INIS)

    Biernacki, T.; Cegla, S.; Ciszewski, W.

    1990-08-01

    The dictionary contains about 5000 terms about conventional and nuclear power plants, energy sources, transmission lines, automation, power systems, environment protection, statistics etc. Each term is given with definition and its equivalents in English, French, German and Russian. Indexes of Polish, English, French, German and Russian terms are provided at the back of dictionary. (A.S.)

  7. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  8. Experimental Investigation of the Corona Discharge in Electrical Transmission due to AC/DC Electric Fields

    Directory of Open Access Journals (Sweden)

    Fuangpian Phanupong

    2016-01-01

    Full Text Available Nowadays, using of High Voltage Direct Current (HVDC transmission to maximize the transmission efficiency, bulk power transmission, connection of renewable power source from wind farm to the grid is of prime concern for the utility. However, due to the high electric field stress from Direct Current (DC line, the corona discharge can easily be occurred at the conductor surface leading to transmission loss. Therefore, the polarity effect of DC lines on corona inception and breakdown voltage should be investigated. In this work, the effect of DC polarity and Alternating Current (AC field stress on corona inception voltage and corona discharge is investigated on various test objects, such as High Voltage (HV needle, needle at ground plane, internal defect, surface discharge, underground cable without cable termination, cable termination with simulated defect and bare overhead conductor. The corona discharge is measured by partial discharge measurement device with high-frequency current transformer. Finally, the relationship between supply voltage and discharge intensity on each DC polarity and AC field stress can be successfully determined.

  9. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  10. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  11. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  12. Station-keeping of a high-altitude balloon with electric propulsion and wireless power transmission: A concept study

    Science.gov (United States)

    van Wynsberghe, Erinn; Turak, Ayse

    2016-11-01

    A stable, ultra long-duration high-altitude balloon (HAB) platform which can maintain stationary position would represent a new paradigm for telecommunications and high-altitude observation and transmission services, with greatly reduced cost and complexity compared to existing technologies including satellites, telecom towers, and unmanned aerial vehicles (UAVs). This contribution proposes a lightweight superpressure balloon platform for deployment to an altitude of 25 km. Electrohydrodynamic (EHD) thrusters are presented to maintain position by overcoming stratospheric winds. Critical to maintaining position is a continual supply of electrical power to operate the on-board propulsion system. One viable solution is to deliver power wirelessly to a high-altitude craft from a ground-based transmitter. Microwave energy, not heavily attenuated by the atmosphere, can be provided remotely from a ground-based generator (magnetron, klystron, etc.) and steered electrically with an antenna array (phased array) at a designated frequency (such as 2.45 or 5.8 GHz). A rectifying antenna ("rectenna") on the bottom of the balloon converts waves into direct current for on-board use. Preliminary mission architecture, energy requirements, and safety concerns for a proposed system are presented along with recommended future work.

  13. Transmission capacity and market power: the effect on a dominant generation firm

    International Nuclear Information System (INIS)

    Quick, David M.; Carey, Janis M.

    2002-01-01

    We examine the effect of transmission on a firm's market power by analyzing the optimal dispatch for a dominant firm in a short-run regional electricity generation market. Application of our research to Colorado shows that the dominant firm can strategically congest transmission into the region to receive a maximum price 54.9% of the time. When it does not get the maximum price, the dominant firm can receive an 11.6% average markup over the competitive price. We show how the threat of entry across an enhanced transmission grid can increase competition and limit market power in Colorado. (Author)

  14. Cross-Country Electricity Trade, Renewable Energy and European Transmission Infrastructure Policy

    OpenAIRE

    Abrell, Jan; Rausch, Sebastian

    2016-01-01

    This paper develops a multi-country multi-sector general equilibrium model, integrating high-frequency electricity dispatch and trade decisions, to study the e ects of electricity transmission infrastructure (TI) expansion and re- newable energy (RE) penetration in Europe for gains from trade and carbon dioxide emissions in the power sector. TI can bene t or degrade environ- mental outcomes, depending on RE penetration: it complements emissions abatement by mitigating dispatch problems associ...

  15. Development of a coordinated control system for BWR nuclear power plant and HVDC transmission system

    International Nuclear Information System (INIS)

    Ishikawa, M.; Hara, T.; Hirayama, K.; Sekiya, K.

    1986-01-01

    The combined use of dc and ac transmissions or so-called hybrid transmission was under study, employing both dc and ac systems to enable stable transmission of 10,000 MW of electric power generated by the BWR nuclear plant, scheduled to be built about 800 km away from the center of the load. It was thus necessary to develop a hybrid power transmission control system, the hybrid power transmission system consisting of a high voltage dc transmission system (HVDC) and an ultrahigh ac transmission system (UHVAC). It was also necessary to develop a control system for HVDC transmission which protects the BWR nuclear power plant from being influenced by any change in transmission mode that occurs as a result of faults on the UHVAC side when the entire power of the BWR plant is being sent by the HVDC transmission. This paper clarifies the requirements for the HVDC system control during hybrid transmission and also during dc transmission. The control method that satisfies these requirements was studied to develop a control algorithm

  16. Power transmission pricing: issues and international experience

    International Nuclear Information System (INIS)

    Bodenhoefer, H.J.; Wohlgemuth, N.

    2001-01-01

    A key aspect of electricity industry reorganization is transmission pricing because it heavily influences the degree of effective competition in 'liberalized' electricity markets. this paper presents an overview transmission pricing models, of issues related to an effective design of a transmission pricing approach, and presents approaches implemented internationally. A conclusion is that, due to the great number of institutional designs of electricity market organizations, particularly in Europe, it will be difficult to design/implement a model of cross-border transmission pricing that is capable of inducing a high degree of non-discriminatory international competition in electricity markets. (author)

  17. Architecture Analysis of Wireless Power Transmission for Lunar Outposts

    Science.gov (United States)

    2015-09-01

    continuous supply of electrical power would be required. The primary research was to determine if it is feasible to provide power to a lunar polar...space exploration business wish to go beyond the Moon, to Mars and to the asteroids , the technology for these ventures is not yet adequate for the task...klystron, both 16 developed during World War II, that the use of microwaves became available for effective transmission of energy. However, the

  18. A GIS-based Power Transmission Management Information System

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    <正>Based on analyzing the shortcomings of electric power enterprise in traditional operation pattern,this paper combines components GIS with the application of management information system,and uses the structure which unifies three layers C/S and B/S.Also,proposed using the GPS intellectualization patrol.This may be useful to guarantees the transmission line’s operation to be safe and stable.

  19. Reactor power control method upon accidents of electrical power system

    International Nuclear Information System (INIS)

    Hirose, Masao.

    1983-01-01

    Purpose: To enable to continue the operation of a BWR type reactor by avoiding the scram while suppressing the reactor power, just after the external disturbance such as earth-trouble in power-transmission network. Method: Steep power drop of an electrical generator is to be detected not only by a current-type power-load-unbalance relay but also with a power-type power-load-unbalance-relay. If steep power-drop was detected by the latter relay, a previously selected control rod is rapidly inserted into the reactor. In this way, in the case where there is a possibility of the reactor scram, the scram can be avoided by suppressing the reactor power, thus the reactor operation can be continued. (Kamimura, M.)

  20. Generation adequacy and transmission interconnection in regional electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Saguan, Marcelo; Finon, Dominique; Pignon, Virginie

    2009-01-01

    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.

  1. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a single...... TSO operating in each jurisdiction. The solution for European regulators has been found in international regulatory benchmarking, organized in collaboration with the Council of European Energy Regulators (CEER) in 2008 and 2012 for 22 and 23 TSOs, respectively. The frontier study provides static cost...... weight restrictions and a correction method for opening balances....

  2. Intelligent Electric Power Systems with Active-Adaptive Electric Networks: Challenges for Simulation Tools

    Directory of Open Access Journals (Sweden)

    Ufa Ruslan A.

    2015-01-01

    Full Text Available The motivation of the presented research is based on the needs for development of new methods and tools for adequate simulation of intelligent electric power systems with active-adaptive electric networks (IES including Flexible Alternating Current Transmission System (FACTS devices. The key requirements for the simulation were formed. The presented analysis of simulation results of IES confirms the need to use a hybrid modelling approach.

  3. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  4. Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

    2007-03-01

    The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

  5. MATL : Canada's first merchant power transmission interconnection : experiences and future outlook

    International Nuclear Information System (INIS)

    Wilson, L.

    2006-01-01

    The current status of the Montana Alberta Tie Ltd. (MATL) merchant transmission project was outlined with reference to the business concept, the advantages of the project and market opportunities. Some of the challenges facing the project were discussed along with lessons learned and accomplishments thus far. MATL is preparing to construct a privately funded transmission line between Lethbridge, Alberta and Great Falls, Montana. The project represents the first direct power transmission inter-connection between Montana and Alberta. The 346 km, 230 kV AC transmission line with phase shifting transformer and 300 MW transfer capacity will be a synchronous interconnection and will improve the reliability of the entire electric systems in both Montana and Alberta. The benefits of the interconnected power system include increased reliability and stability of the existing power grids; better import/export capabilities; more competition and options in the marketplace; greater flexibility in scheduling generator maintenance; and, optimal allocation of generation resources. tabs., figs

  6. Recent Progress in Electrical Insulation Techniques for HTS Power Apparatus

    Science.gov (United States)

    Hayakawa, Naoki; Kojima, Hiroki; Hanai, Masahiro; Okubo, Hitoshi

    This paper describes the electrical insulation techniques at cryogenic temperatures, i.e. Cryodielectrics, for HTS power apparatus, e.g. HTS power transmission cables, transformers, fault current limiters and SMES. Breakdown and partial discharge characteristics are discussed for different electrical insulation configurations of LN2, sub-cooled LN2, solid, vacuum and their composite insulation systems. Dynamic and static insulation performances with and without taking account of quench in HTS materials are also introduced.

  7. Air quality and climate benefits of long-distance electricity transmission in China

    Science.gov (United States)

    Peng, Wei; Yuan, Jiahai; Zhao, Yu; Lin, Meiyun; Zhang, Qiang; Victor, David G.; Mauzerall, Denise L.

    2017-06-01

    China is the world’s top carbon emitter and suffers from severe air pollution. It has recently made commitments to improve air quality and to peak its CO2 emissions by 2030. We examine one strategy that can potentially address both issues—utilizing long-distance electricity transmission to bring renewable power to the polluted eastern provinces. Based on an integrated assessment using state-of-the-science atmospheric modeling and recent epidemiological evidence, we find that transmitting a hybrid of renewable (60%) and coal power (40%) (Hybrid-by-wire) reduces 16% more national air-pollution-associated deaths and decreases three times more carbon emissions than transmitting only coal-based electricity. Moreover, although we find that transmitting coal power (Coal-by-Wire, CbW) is slightly more effective at reducing air pollution impacts than replacing old coal power plants with newer cleaner ones in the east (Coal-by-Rail, CbR) (CbW achieves a 6% greater reduction in national total air-pollution-related mortalities than CbR), both coal scenarios have approximately the same carbon emissions. We thus demonstrate that coordinating transmission planning with renewable energy deployment is critical to maximize both local air quality benefits and global climate benefits.

  8. Modeling market power in electricity markets: Is the devil only in the details?

    Energy Technology Data Exchange (ETDEWEB)

    Bautista, Guillermo; Anjos, Miguel F.; Vannelli, Anthony

    2007-01-15

    Basic approximations of the transmission system are ubiquitous in the literature on modeling competition in electricity markets. Because the main concern of market power is with active power, reactive power and voltage-related issues are commonly neglected, even though they are inherent features of an electrical power system. However, the usefulness of stylized formulations that do not comprise these system elements may be severely limited. (author)

  9. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  10. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  11. Magnet Lattice Design for the Transmission of Power Using Particle Beams

    Energy Technology Data Exchange (ETDEWEB)

    Marley, Daniel; /North Carolina State U. /SLAC

    2012-08-24

    As the amount of electricity generated by renewable energy sources continues to increase, the current method of power transmission will not serve as an adequate method for transmitting power over very long distances. A new method for transmitting power is proposed using particle beams in a storage ring. Particle beams offer an incredibly energy efficient alternative to transmission lines in transmitting power over very long distances. A thorough investigation of the magnet lattice design for this storage ring is presented. The design demonstrates the ability to design a ring with stable orbits over a 381.733 km circumference. Double bend achromats and FODO cells are implemented to achieve appropriate {beta} functions and dispersion functions for 9-11 GeV electron beams.

  12. Scenarios of power transmission networks; Cenarios de redes de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Souza Fonseca, L.G. de; Savi, T C.O.; Morozowski Filho, M; Camargo, C C [ELETROSUL, Florianopolis, SC (Brazil)

    1985-12-31

    This work discusses the electrical network expansion considering long term horizons and a purpose of methodology for the establishment of transmission network scenarios. As part of the transmission scenario studies the network expansion problem is described by linearized power flow models and, for transmission system analysis and synthesis, the minimum effort criteria and interactive SINTRA program are used. 4 refs., 3 figs., 2 tabs.

  13. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Taniguchi, Haruto; Ueda, Kiyotaka

    1980-01-01

    HVDC transmission directly from a nuclear power plant is expected as one of the bulk power transmission systems from distant power generating area. Successively from the analysis of HVDC transmission from BWR-type nuclear power plant, this report discusses dynamic response characteristics of HVDC transmission (double poles, two circuits) from PWR type nuclear power plant due to dc-line faults (DC-1LG, 2LG) and ac-line faults (3LG) near inverter station. (author)

  14. A methodology for constraining power in finite element modeling of radiofrequency ablation.

    Science.gov (United States)

    Jiang, Yansheng; Possebon, Ricardo; Mulier, Stefaan; Wang, Chong; Chen, Feng; Feng, Yuanbo; Xia, Qian; Liu, Yewei; Yin, Ting; Oyen, Raymond; Ni, Yicheng

    2017-07-01

    Radiofrequency ablation (RFA) is a minimally invasive thermal therapy for the treatment of cancer, hyperopia, and cardiac tachyarrhythmia. In RFA, the power delivered to the tissue is a key parameter. The objective of this study was to establish a methodology for the finite element modeling of RFA with constant power. Because of changes in the electric conductivity of tissue with temperature, a nonconventional boundary value problem arises in the mathematic modeling of RFA: neither the voltage (Dirichlet condition) nor the current (Neumann condition), but the power, that is, the product of voltage and current was prescribed on part of boundary. We solved the problem using Lagrange multiplier: the product of the voltage and current on the electrode surface is constrained to be equal to the Joule heating. We theoretically proved the equality between the product of the voltage and current on the surface of the electrode and the Joule heating in the domain. We also proved the well-posedness of the problem of solving the Laplace equation for the electric potential under a constant power constraint prescribed on the electrode surface. The Pennes bioheat transfer equation and the Laplace equation for electric potential augmented with the constraint of constant power were solved simultaneously using the Newton-Raphson algorithm. Three problems for validation were solved. Numerical results were compared either with an analytical solution deduced in this study or with results obtained by ANSYS or experiments. This work provides the finite element modeling of constant power RFA with a firm mathematical basis and opens pathway for achieving the optimal RFA power. Copyright © 2016 John Wiley & Sons, Ltd.

  15. CALCULATION METHOD OF ELECTRIC POWER LINES MAGNETIC FIELD STRENGTH BASED ON CYLINDRICAL SPATIAL HARMONICS

    Directory of Open Access Journals (Sweden)

    A.V. Erisov

    2016-05-01

    Full Text Available Purpose. Simplification of accounting ratio to determine the magnetic field strength of electric power lines, and assessment of their environmental safety. Methodology. Description of the transmission lines of the magnetic field by using techniques of spatial harmonic analysis in the cylindrical coordinate system is carried out. Results. For engineering calculations of electric power lines magnetic field with sufficient accuracy describes their first spatial harmonic magnetic field. Originality. Substantial simplification of the definition of the impact of the construction of transmission line poles on the value of its magnetic field and the bands of land alienation sizes. Practical value. The environmentally friendly projection electric power lines on the level of the magnetic field.

  16. A decomposition method for network-constrained unit commitment with AC power flow constraints

    International Nuclear Information System (INIS)

    Bai, Yang; Zhong, Haiwang; Xia, Qing; Kang, Chongqing; Xie, Le

    2015-01-01

    To meet the increasingly high requirement of smart grid operations, considering AC power flow constraints in the NCUC (network-constrained unit commitment) is of great significance in terms of both security and economy. This paper proposes a decomposition method to solve NCUC with AC power flow constraints. With conic approximations of the AC power flow equations, the master problem is formulated as a MISOCP (mixed integer second-order cone programming) model. The key advantage of this model is that the active power and reactive power are co-optimised, and the transmission losses are considered. With the AC optimal power flow model, the AC feasibility of the UC result of the master problem is checked in subproblems. If infeasibility is detected, feedback constraints are generated based on the sensitivity of bus voltages to a change in the unit reactive power generation. They are then introduced into the master problem in the next iteration until all AC violations are eliminated. A 6-bus system, a modified IEEE 30-bus system and the IEEE 118-bus system are used to validate the performance of the proposed method, which provides a satisfactory solution with approximately 44-fold greater computational efficiency. - Highlights: • A decomposition method is proposed to solve the NCUC with AC power flow constraints • The master problem considers active power, reactive power and transmission losses. • OPF-based subproblems check the AC feasibility using parallel computing techniques. • An effective feedback constraint interacts between the master problem and subproblem. • Computational efficiency is significantly improved with satisfactory accuracy

  17. Alternative forms of energy transmission from OTEC plants. [Chemical and electrical

    Energy Technology Data Exchange (ETDEWEB)

    Konopka, A.; Biederman, N.; Talib, A.; Yudow, B.

    1977-01-01

    The transmission of OTEC-derived chemical and electrical energy is compared. The chemical energy-carriers considered are the following: gaseous and liquid hydrogen, liquid ammonia, methanol, gasoline, hydrazine hydrate, anhydrous hydrazine, unsymmetrical dimethylhydrazine (UDMH), 1,7-Octadiyne, and tetrahydrodicyclopentadiene. The assessment assumes that each of the above energy carriers were transported by barge and/or pipeline. The delivered costs were then compared with transmission of electricity by submarine cables. Because chemical and electrical energy are not equivalent, however, their comparison can only be done after the outputs are converted to a common form. Thus, in addition to presenting the delivered cost and overall energy efficiency of the chemical energy-carriers, we have provided a discussion of the equipment, costs, and efficiencies of converting the hydrogen and ammonia delivered into electricity, and the electricity delivered into hydrogen and ammonia. A concise technical assessment and economic analysis of components associated with the conversion, storage, transportation, and shore-based receiving facilities for the conversion of OTEC mechanical energy to chemical energy is provided and compared to the conversion and transmission of electrical power. Results concerning the hydrogen and ammonia analysis were determined as part of the OTEC program at IGT from May 1975 through May 1976 under Contract No. NSF-C1008 (AER-75-00033) with the National Science Foundation and ERDA. Information concerning carbonaceous fuels and high-energy fuels production was developed as part of the current IGT OTEC program under Contract No. E(49-18)-2426 with ERDA.

  18. Long-distance power transmission technology. Microwave power transmission; Denryoku no chokyori yuso gijutsu. Micro ha musen soden

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N [Kobe University, Kobe (Japan). Faculty of Engineering

    1994-11-05

    This paper explains the principles of microwave power transmission as a long-distance power transmission technology, and the status of its development. Under an assumption of using a wave length of 12 cm (2.45 GHz) and a transmission distance of 1 km, an ideal wireless power transmission can realize transmitting the power at an efficiency of 95% or higher if transmitting and receiving antennas with a radius of 8.8 m are used. What remains as important requirements is raising the efficiency of conversion from power supply into microwaves, and the efficiency of rectification after the power has been received. By using microwave energy sent from a transmission antenna installed on the roof of an automobile, a model airplane with a receiving antenna installed at its rear flew successfully for 40 seconds under the microwave lifted airplane experiment (MILAX). In an experiment of transmitting microwave power in space, power was successfully transmitted to the child rocket as an event under the International Space Year - Microwave Energy Transmission in Space (ISY-METS). The microwave wireless power transmission on the ground would have a possibility of taking over the overhead line transmission into islands. An attempt is scheduled to send power of 5 kW by using transmission and receiving antennas with a diameter of 3 m to investigate effects on transmission efficiency, and communications and electromagnetic environments, and to collect basic data. 3 refs., 3 figs.

  19. Nuclear Power as an Option in Electrical Generation Planning for Small Economy and Electricity Grid

    International Nuclear Information System (INIS)

    Tomsic, Z.

    2012-01-01

    Implementing a NPP in countries with relatively small total GDP (small economy) and usually with small electricity grid face two major problems and constrains: the ability to obtain the considerable financial resources required on reasonable terms and to connect large NPP to small electricity grid. Nuclear generation financing in developing countries involves complex issues that need to be fully understood and dealt with by all the parties involved. The main topics covered by paper will be the: special circumstances related to the financing of NPP, costs and economic feasibility of NPP, conventional approaches for financing power generation projects in developing countries, alternative approaches for mobilizing financial resources. The safe and economic operation of a nuclear power plant (NPP) requires the plant to be connected to an electrical grid system that has adequate capacity for exporting the power from the NPP, and for providing a reliable electrical supply to the NPP for safe start-up, operation and normal or emergency shut-down of the plant. Connection of any large new power plant to the electrical grid system in a country may require significant modification and strengthening of the grid system, but for NPPs there may be added requirements to the structure of the grid system and the way it is controlled and maintained to ensure adequate reliability. Paper shows the comparative assesment of differrent base load technologies as an option in electrical generation planning for small economy and electricity grid.(author).

  20. Present state of electric power business in United States and Europe

    International Nuclear Information System (INIS)

    Onishi, Kenichi

    2011-01-01

    This article reported present state of nuclear power and electric power business in United States and Europe after Fukushima Daiichi Accident. As for the trend of demand and supply of electric power and policy, the accident forced Germany possibly to proceed with phase-out of nuclear power, but France and United States to sustain nuclear power with no great change of energy policy at this moment. As for the trend of electric power market, there was not state in United States with liberalized retail market of electric power after rolling blackouts occurred in California State in the early 2000s. In Germany proceeding with renewable energy introduction, renewable electricity fed into the grid was paid for by the network operators at fixed tariffs and the costs passed on to electricity consumers were increasing. Renewable Portfolio Standards (RPS) in United States forced the state to introduction of renewable energy to some ratio, and Feed-in Tariff (FIT) introduced in EU in 1990s lead to introduction of a large amount of renewable electricity targeted in 2020. Huge amount of wind power introduction brought about several problems to solve such that excess electric power above domestic demand had bad effects on grids in neighboring region. Enforcement of power transmission lines was also needed with increase of maximum electric power as well as introduction of a large amount of renewable electricity. (T. Tanaka)

  1. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  2. Transmission of electric dipole radiation through an interface

    Energy Technology Data Exchange (ETDEWEB)

    Arnoldus, Henk F., E-mail: hfa1@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Berg, Matthew J., E-mail: matt.berg@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Li, Xin, E-mail: Xin.Li@millersville.edu [Department of Physics, P.O. Box 1002, Millersville University, Millersville, PA 17551 (United States)

    2014-02-07

    We consider the transmission of electric dipole radiation through an interface between two dielectrics, for the case of a vertical dipole. Energy flows along the field lines of the Poynting vector, and in the optical near field these field lines are curves (as opposed to optical rays). When the radiation passes through the interface into a thicker medium, the field lines bend to the normal (as rays do), but the transmission angle is not related to the angle of incidence. The redirection of the radiation at the interface is determined by the angle dependence of the transmission coefficient. This near-field redistribution is responsible for the far-field angular power pattern. When the transmission medium is thinner than the embedding medium of the dipole, some energy flows back and forth through the interface in an oscillating fashion. In each area where field lines dip below the interface, an optical vortex appears just above the interface. The centers of these vortices are concentric singular circles around the dipole axis.

  3. Electric power monthly. June 1966 with data for March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This publication presents monthly electricity statistics for a wide audience including Congress, Federal and state agencies, the electric utility industry, and the general public, with the purpose of providing energy decisionmakers with accurate, timely information that may be used in forming various perspectives on electric issues that lie ahead. EIA collected the information in this report to fulfill its data collection and dissemination responsibilities (Public Law 93-275). A section on upgrading transmission capacity for wholesale electric power trade is included. The tables include US electric power at a glance, utility net generation, utility consumption of fossil fuels, fossil-fuel stocks/receipts/cost at utilities, utility sales/revenue/revenue per kWh, and monthly plant aggregates.

  4. Electric power distribution. 5th Rev. Ed. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Flosdorff, R; Hilgarth, G

    1986-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  5. Optimal Coordinated EV Charging with Reactive Power Support in Constrained Distribution Grids

    Energy Technology Data Exchange (ETDEWEB)

    Paudyal, Sumit; Ceylan, Oğuzhan; Bhattarai, Bishnu P.; Myers, Kurt S.

    2017-07-01

    Electric vehicle (EV) charging/discharging can take place in any P-Q quadrants, which means EVs could support reactive power to the grid while charging the battery. In controlled charging schemes, distribution system operator (DSO) coordinates with the charging of EV fleets to ensure grid’s operating constraints are not violated. In fact, this refers to DSO setting upper bounds on power limits for EV charging. In this work, we demonstrate that if EVs inject reactive power into the grid while charging, DSO could issue higher upper bounds on the active power limits for the EVs for the same set of grid constraints. We demonstrate the concept in an 33-node test feeder with 1,500 EVs. Case studies show that in constrained distribution grids in coordinated charging, average costs of EV charging could be reduced if the charging takes place in the fourth P-Q quadrant compared to charging with unity power factor.

  6. Optimization models and techniques for implementation and pricing of electricity markets

    International Nuclear Information System (INIS)

    Madrigal Martinez, M.

    2001-01-01

    The operation and planning of vertically integrated electric power systems can be optimized using models that simulate solutions to problems. As the electric power industry is going through a period of restructuring, there is a need for new optimization tools. This thesis describes the importance of optimization tools and presents techniques for implementing them. It also presents methods for pricing primary electricity markets. Three modeling groups are studied. The first considers a simplified continuous and discrete model for power pool auctions. The second considers the unit commitment problem, and the third makes use of a new type of linear network-constrained clearing system model for daily markets for power and spinning reserve. The newly proposed model considers bids for supply and demand and bilateral contracts. It is a direct current model for the transmission network

  7. Implantable power generation system utilizing muscle contractions excited by electrical stimulation.

    Science.gov (United States)

    Sahara, Genta; Hijikata, Wataru; Tomioka, Kota; Shinshi, Tadahiko

    2016-06-01

    An implantable power generation system driven by muscle contractions for supplying power to active implantable medical devices, such as pacemakers and neurostimulators, is proposed. In this system, a muscle is intentionally contracted by an electrical stimulation in accordance with the demands of the active implantable medical device for electrical power. The proposed system, which comprises a small electromagnetic induction generator, electrodes with an electrical circuit for stimulation and a transmission device to convert the linear motion of the muscle contractions into rotational motion for the magneto rotor, generates electrical energy. In an ex vivo demonstration using the gastrocnemius muscle of a toad, which was 28 mm in length and weighed 1.3 g, the electrical energy generated by the prototype exceeded the energy consumed for electrical stimulation, with the net power being 111 µW. It was demonstrated that the proposed implantable power generation system has the potential to replace implantable batteries for active implantable medical devices. © IMechE 2016.

  8. Preliminary assessment of the tradeoffs between the electric motor and the transmission in electric vehicles

    Science.gov (United States)

    Levi, E.

    1983-01-01

    The efficiency, weight, and cost of various propulsion system for 4-passenger electric vehicles are compared. These systems comprise the electric motor and the required speed reducing transmission to obtain the appropriate speed at the wheel. Three types of motors, dc synchronous, and squirrel-cage were considered at 6000 ycm and 24 000 rpm for a peak power of 40 kW. Two types of gearing selected were a single speed differential and a differential with a differential with a 4-speed gearbox. Only components that were readily realizable within present state-of-the-art were considered.

  9. Pricing transmission services

    International Nuclear Information System (INIS)

    Haaden, E.

    1995-01-01

    The price structure for transmission of electric power through the main lines in Sweden is analyzed. After deregulation of the electricity market, the main transmission lines are owned by a separate national company, with no interests from the power producers. Comparisons are made to ideal marginal price structures. 6 refs

  10. Ethics on the TEPCO bankruptcy, nuclear power plants and regulatory reform in the electric power industry

    International Nuclear Information System (INIS)

    Koga, Shigeaki

    2013-01-01

    Although regulatory reform in the electric power industry had been considered as part of social system reform like in the finance and communications to liberalize the market, there still continued to exist regional monopoly, integrated system for power generation, transmission and distribution, and lack of competition. The Fukushima accident showed such electric power system was unethical as social system compared to ordinary industries, because electric power company getting profit could not be prepared for nuclear damage liability and would burden third unrelated parties with risk. Electric power company should be forced to insure nuclear power plants for nuclear accidents. Otherwise restart of nuclear power plant operation should not be allowed. Nuclear power had been justified to be entitled grant or subsidy from the government for public good, which would be unfair to people. This article presented speeding-up scheme of Fukushima accident treatment leading to TEPCO bankruptcy and discussed measures against concerns or comments about bankruptcy procedures, major part of which might be mitigation of fund-raising fear by government support. At the proceeding of bankruptcy procedure including spinning off of separate companies, regulatory reform in the electric power industry could be taken in advanced. (T. Tanaka)

  11. Electrical energy market management in deregulated power system

    International Nuclear Information System (INIS)

    Abady, A. F.; Niknam, T.

    2003-01-01

    For many decades, vertically integrated electric utilities monopolized the way they control, sell and distribute electricity to customers in their service territories. In this monopoly, each utility managed three main components of the system: generation, transmission and distribution. Analogous to perceived competitions in airline, communication and natural gas industries which demonstrated that vertically integrated monopolies could not provide services as efficiently as competitive firms, the electric power industry plans to improve its efficiency by providing a more reliable energy at least cost to customers. A competition is guaranteed by establishing a restructured environment in which customers could choose to buy from different suppliers and change suppliers as they wish in order to pay market base rates. This paper is dealing with progressive approach of restructuring in power and introduce ISO, its functions and model of electrical energy markets

  12. Modeling and Economic Analysis of Power Grid Operations in a Water Constrained System

    Science.gov (United States)

    Zhou, Z.; Xia, Y.; Veselka, T.; Yan, E.; Betrie, G.; Qiu, F.

    2016-12-01

    The power sector is the largest water user in the United States. Depending on the cooling technology employed at a facility, steam-electric power stations withdrawal and consume large amounts of water for each megawatt hour of electricity generated. The amounts are dependent on many factors, including ambient air and water temperatures, cooling technology, etc. Water demands from most economic sectors are typically highest during summertime. For most systems, this coincides with peak electricity demand and consequently a high demand for thermal power plant cooling water. Supplies however are sometimes limited due to seasonal precipitation fluctuations including sporadic droughts that lead to water scarcity. When this occurs there is an impact on both unit commitments and the real-time dispatch. In this work, we model the cooling efficiency of several different types of thermal power generation technologies as a function of power output level and daily temperature profiles. Unit specific relationships are then integrated in a power grid operational model that minimizes total grid production cost while reliably meeting hourly loads. Grid operation is subject to power plant physical constraints, transmission limitations, water availability and environmental constraints such as power plant water exit temperature limits. The model is applied to a standard IEEE-118 bus system under various water availability scenarios. Results show that water availability has a significant impact on power grid economics.

  13. Advances in Optimizing Weather Driven Electric Power Systems.

    Science.gov (United States)

    Clack, C.; MacDonald, A. E.; Alexander, A.; Dunbar, A. D.; Xie, Y.; Wilczak, J. M.

    2014-12-01

    The importance of weather-driven renewable energies for the United States (and global) energy portfolio is growing. The main perceived problems with weather-driven renewable energies are their intermittent nature, low power density, and high costs. The National Energy with Weather System Simulator (NEWS) is a mathematical optimization tool that allows the construction of weather-driven energy sources that will work in harmony with the needs of the system. For example, it will match the electric load, reduce variability, decrease costs, and abate carbon emissions. One important test run included existing US carbon-free power sources, natural gas power when needed, and a High Voltage Direct Current power transmission network. This study shows that the costs and carbon emissions from an optimally designed national system decrease with geographic size. It shows that with achievable estimates of wind and solar generation costs, that the US could decrease its carbon emissions by up to 80% by the early 2030s, without an increase in electric costs. The key requirement would be a 48 state network of HVDC transmission, creating a national market for electricity not possible in the current AC grid. These results were found without the need for storage. Further, we tested the effect of changing natural gas fuel prices on the optimal configuration of the national electric power system. Another test that was carried out was an extension to global regions. The extension study shows that the same properties found in the US study extend to the most populous regions of the planet. The extra test is a simplified version of the US study, and is where much more research can be carried out. We compare our results to other model results.

  14. Impacts on investments, and transmission/distribution loss through power sector reforms

    International Nuclear Information System (INIS)

    Nagayama, Hiroaki

    2010-01-01

    This study analyses original panel data from 86 countries between 1985 and 2006. Econometric methods were used to identify the effects of different policy devices of power sector reforms on performance indicators (installed capacity per capita, transmission and distribution loss) in the countries analyzed. The research findings suggest that reform variables such as the entry of independent power producers (IPPs), unbundling of generation and transmission, establishment of regulatory agencies, and the introduction of a wholesale spot market are the driving forces of increasing generation capacity, as well as reducing transmission and distribution loss in the respective regions. In this study, we can assume that, firstly, different electric industry's reform policies/measures have different impacts on geographically and economically diverse countries. Secondly, a country's state of economic development has a different impact on policy effects of reforms. Thirdly, coexistent with independent regulatory agencies, reform policy becomes more powerful in realizing sector performances.

  15. Research on hybrid transmission mode for HVDC with optimal thermal power and renewable energy combination

    Science.gov (United States)

    Zhang, Jinfang; Yan, Xiaoqing; Wang, Hongfu

    2018-02-01

    With the rapid development of renewable energy in Northwest China, curtailment phenomena is becoming more and more serve owing to lack of adjustment ability and enough transmission capacity. Based on the existing HVDC projects, exploring the hybrid transmission mode associated with thermal power and renewable power will be necessary and important. This paper has proposed a method on optimal thermal power and renewable energy combination for HVDC lines, based on multi-scheme comparison. Having established the mathematic model for electric power balance in time series mode, ten different schemes have been picked for figuring out the suitable one by test simulation. By the proposed related discriminated principle, including generation device utilization hours, renewable energy electricity proportion and curtailment level, the recommendation scheme has been found. The result has also validated the efficiency of the method.

  16. Progress of technological innovation on electric power in FY2014

    International Nuclear Information System (INIS)

    Nishikawa, Yoshikazu; Fujii, Yutaka; Sasagawa, Toshiro

    2015-01-01

    This paper overviews the technological development in FY2014 at Tokyo Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company, Shikoku Electric Power Company, and Electric Power Development Company. In this overview, further breakdown was made for the following departments of each company: nuclear power generation, thermal power generation, hydraulic power generation, power transmission, power distribution, transformation, research and development and technological development, and information and communication. In addition, this paper outlines the achievement of technological development at Japan Atomic Power Company, such as the technological development related to the existing power station, development of new technology, and the development of future reactor. Fukushima Daiichi Nuclear Power Station has developed an investigative system using a high altitude survey robot and a movable monitoring system. Hamaoka Nuclear Power Station examined the feasibility of state diagnostic technique based on multi-point analysis, and studied stress corrosion cracking at the newly established Nuclear Safety Research Laboratory. Shika Nuclear Power Station (Unit 1) applied a pipe stress improvement process by means of high frequency induction heating as a stress corrosion cracking countermeasure. Ikata Nuclear Power Station newly adopted high degree cross-linking cation resin, and high cracking strength anion resin as the primary resins. Oma Nuclear Power Station worked on the all reactor core utilization technology of MOX fuel. (A.O.)

  17. Space Weather Effects on Current and Future Electric Power Systems

    Science.gov (United States)

    Munoz, D.; Dutta, O.; Tandoi, C.; Brandauer, W.; Mohamed, A.; Damas, M. C.

    2016-12-01

    This work addresses the effects of Geomagnetic Disturbances (GMDs) on the present bulk power system as well as the future smart grid, and discusses the mitigation of these geomagnetic impacts, so as to reduce the vulnerabilities of the electric power network to large space weather events. Solar storm characterized by electromagnetic radiation generates geo-electric fields that result in the flow of Geomagnetically Induced Currents (GICs) through the transmission lines, followed by transformers and the ground. As the ground conductivity and the power network topology significantly vary with the region, it becomes imperative to estimate of the magnitude of GICs for different places. In this paper, the magnitude of GIC has been calculated for New York State (NYS) with the help of extensive modelling of the whole NYS electricity transmission network using real data. Although GIC affects only high voltage levels, e.g. above 300 kV, the presence of coastline in NYS makes the low voltage transmission lines also susceptible to GIC. Besides this, the encroachment of technologies pertaining to smart grid implementation, such as Phasor Measurement Units (PMUs), Microgrids, Flexible AC Transmission System (FACTS), and Information and Communication Technology (ICT) have been analyzed for GMD impacts. Inaccurate PMU results due to scintillation of GPS signals that are affected by electromagnetic interference of solar storm, presence of renewable energy resources in coastal areas that are more vulnerable to GMD, the ability of FACTS devices to either block or pave new path for GICs and so on, shed some light on impacts of GMD on smart grid technologies.

  18. Induced voltages in metallic pipelines near power transmission lines

    International Nuclear Information System (INIS)

    Grcev, Leonid; Jankov, Voislav; Filiposki, Velimir

    2002-01-01

    With the continuous development of the electric power system and the pipeline networks used to convey oil or natural gas, cases of close proximity of high voltage structures and metallic pipelines become more and more frequent. Accordingly there is a growing concern about possible hazards resulting from voltages induced in the metallic pipelines by magnetic coupling with nearby power transmission lines. This paper presents a methodology for computation of the induced voltages in buried isolated metallic pipelines. A practical example of computation is also presented. (Author)

  19. A modular restoration tower for electric power line transmission

    Energy Technology Data Exchange (ETDEWEB)

    Nicolazzi, L.C.; Pereira, J.C.; Leonel, C.E.L.; Rocha, G.B.; Bianchezzi, V.; Mendes, F. [Universidade Federal Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica], Emails: lauro@grante.ufsc.br, jcarlos@grante.ufsc.br; Luz, R.L. [ELETROSUL Centrais Eletricas S.A., Florianopolis, SC (Brazil)], Email: rluz@eletrosul.gov.br

    2009-07-01

    The main target of this R and D project is to develop an restoration tower for electric energy lines transmission. Whereas these towers should present the main features like transport facility, easiest assembling associated with a low cost of manufacture, it was applied the single-column tower concepts supported by stays, modularized, framed and articulated at the base. The concepts used for this development was a design methodology. From the different definition situations of load, numerical models have been developed focusing the design to the best of structural element arrangements of its modules. Then, tests were performed in laboratory to determine the module structural performance for different work load situations. These tests served to identify inconsistencies in the numerical models and proposed adjustments in its design to improve its performance on the strength and stability. (author)

  20. Coordinated parallel and series flexible AC transmission systems (FACTS) to support a power grid with a large amount of wind power

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Cantallops, Marcal; Gomis-Bellmunt, Oriol; Sumper, Andreas; Rull-Duran, Joan [Univ. Politecnica de Catalunya, Barcelona (ES). Centre d' Innovacio Tecnologica en Convertidors Estatics i Accionaments (CITCEA-UPC)

    2009-07-01

    Wind power constitutes one of the more viable alternatives to conventional power generation technology. In the previous years, wind power penetration on electric grids has grown notably, and has brought several new issues related to its integration into power grids. Flexible AC Transmission Systems (FACTS) installed in the right place and controlled conveniently are able to mitigate and solve many of these issues. In the present work, a STATCOM and a SSSC are used coordinately to fully support an electric grid. Simulations include normal and fault operation. (orig.)

  1. The evolution of the electric power market towards competition

    International Nuclear Information System (INIS)

    Puerta, J.F.; Arceluz, J.F.

    1995-01-01

    The changes introduced in the electric power industry aiming at improving the systems' efficiency are presented. These changes will make the generation, transmission and distribution activities competitive. The advantages and disadvantages of these initiatives and their economic and cultural contexts are analysed

  2. Integrated Multimedia Based Intelligent Group Decision Support System for Electrical Power Network

    OpenAIRE

    Ajay Kumar Saxena; S. 0. Bhatnagar; P. K Saxena

    2002-01-01

    Electrical Power Network in recent time requires an intelligent, virtual environment based decision process for the coordination of all its individual elements and the interrelated tasks. Its ultimate goal is to achieve maximum productivity and efficiency through the efficient and effective application of generation, transmission, distribution, pricing and regulatory systems. However, the complexity of electrical power network and the presence of conflicting multiple goals and objectives p...

  3. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  4. Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market

    International Nuclear Information System (INIS)

    Wolak, Frank A.

    2015-01-01

    Transmission expansions can increase the extent of competition faced by wholesale electricity suppliers with the ability to exercise unilateral market power. This can cause them to submit offer curves closer to their marginal cost curves, which sets market-clearing prices closer to competitive benchmark price levels. These lower wholesale market-clearing prices are the competitiveness benefit consumers realize from the transmission expansion. This paper quantifies empirically the competitiveness benefits of a transmission expansion policy that causes strategic suppliers to expect no transmission congestion. Using hourly generation-unit level offer, output, market-clearing price and congestion data from the Alberta wholesale electricity market from January 1, 2009 to July 31, 2013, an upper and lower bound on the hourly consumer competitiveness benefits of this transmission policy is computed. Both of these competitiveness benefits measures are economically significant, which argues for including them in transmission planning processes for wholesale electricity markets to ensure that all transmission expansions with positive net benefits to electricity consumers are undertaken. -- Highlights: •Define competitiveness benefits to consumers from transmission expansions in wholesale market. •Compute upper and lower bounds on competitiveness benefits for Alberta market. •Compare no-perceived congestion prices to actual prices to measure competitiveness benefits. •Economically substantial competitiveness benefits found for sample period studied. •To ensure adequate transmission, planning processes should account for these benefits

  5. Transmission-line-circuit model of an 85-TW, 25-MA pulsed-power accelerator

    OpenAIRE

    B. T. Hutsel; P. A. Corcoran; M. E. Cuneo; M. R. Gomez; M. H. Hess; D. D. Hinshelwood; C. A. Jennings; G. R. Laity; D. C. Lamppa; R. D. McBride; J. K. Moore; A. Myers; D. V. Rose; S. A. Slutz; W. A. Stygar

    2018-01-01

    We have developed a physics-based transmission-line-circuit model of the Z pulsed-power accelerator. The 33-m-diameter Z machine generates a peak electrical power as high as 85 TW, and delivers as much as 25 MA to a physics load. The circuit model is used to design and analyze experiments conducted on Z. The model consists of 36 networks of transmission-line-circuit elements and resistors that represent each of Zs 36 modules. The model of each module includes a Marx generator, intermediate-en...

  6. New plans for increasing transmission and intertie capacity : moving towards a more integrated power market in Atlantic Canada

    International Nuclear Information System (INIS)

    Roberge, F.

    2003-01-01

    This PowerPoint presentation provided a brief review of the electric power industry in Quebec after deregulation. It included an outline of non-regulated activity and regulated activities in terms of power generation, transmission, distribution and customer service. Both the transmission and distribution components of the power industry in Quebec are regulated by the Regie de l'energie. Transmission networks offer access to all wholesalers. Quebec does not have an energy spot market and electricity prices are currently very low. Hydro-Quebec TransEnergie was created in 1997 as a functionally independent open access transmission provider with high reliability standards. TransEnergie can address seams issues with neighbouring networks. The three types of services offered in terms of tariffs were also discussed in this presentation along with data regarding Hydro-Quebec assets, revenue and net income. Hydro-Quebec's relation with the Atlantic provinces were also described. Interconnection with New Brunswick totals 785 MW. No new interconnection is planned. 1 tab., 4 figs

  7. Information management system for the analysis of the program of electric power transmission construction; Sistema gerencial de informacao para analise do programa de obras de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Peres, Luiz A. Pecorelli; Lima Junior, Moacir P.; Kayat, Julio; Berer, Ricardo; Sondermann, Luiz O. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1993-12-31

    The management of an implementation and coordination program for electric power transmission lines construction needs to have access to up to date information in several areas. Aiming to attend these basic requisites a data base computer program was developed. This work describes such program 7 refs., 4 figs.

  8. Application of pattern search method to power system security constrained economic dispatch with non-smooth cost function

    International Nuclear Information System (INIS)

    Al-Othman, A.K.; El-Naggar, K.M.

    2008-01-01

    Direct search methods are evolutionary algorithms used to solve optimization problems. (DS) methods do not require any information about the gradient of the objective function at hand while searching for an optimum solution. One of such methods is Pattern Search (PS) algorithm. This paper presents a new approach based on a constrained pattern search algorithm to solve a security constrained power system economic dispatch problem (SCED) with non-smooth cost function. Operation of power systems demands a high degree of security to keep the system satisfactorily operating when subjected to disturbances, while and at the same time it is required to pay attention to the economic aspects. Pattern recognition technique is used first to assess dynamic security. Linear classifiers that determine the stability of electric power system are presented and added to other system stability and operational constraints. The problem is formulated as a constrained optimization problem in a way that insures a secure-economic system operation. Pattern search method is then applied to solve the constrained optimization formulation. In particular, the method is tested using three different test systems. Simulation results of the proposed approach are compared with those reported in literature. The outcome is very encouraging and proves that pattern search (PS) is very applicable for solving security constrained power system economic dispatch problem (SCED). In addition, valve-point effect loading and total system losses are considered to further investigate the potential of the PS technique. Based on the results, it can be concluded that the PS has demonstrated ability in handling highly nonlinear discontinuous non-smooth cost function of the SCED. (author)

  9. Optimal utilization of electric power in the Nordic countries

    International Nuclear Information System (INIS)

    Magnusson, G.; Gjelsvik, E.

    1992-01-01

    It is attempted to address the questions of which advantages the equilibrium solution would have for the energy market under free trade conditions, how Nordic electric power can be used optimally and what the trading pattern looks like, which kind of competition the transmission of electricity via cables to Iceland and other Nordic countries will meet in the United Kingdom (UK) and the Continent, how high the option values are of trading with electric power via cables from, for example, Iceland to the UK and how great the profit could be from a more effective use of electricity for aluminium production in Norway and Iceland. Data are given on consumer prices for 1990 in Scandinavia, Germany and the UK, and a few graphs and a map illustrate the text. (AB)

  10. A control-oriented simulation model of a power-split hybrid electric vehicle

    International Nuclear Information System (INIS)

    Cipek, Mihael; Pavković, Danijel; Petrić, Joško

    2013-01-01

    Highlights: ► A simulation model of a two mode power-split hybrid electric vehicle (HEV) is proposed. ► Modeling the energy losses in the HEV transmission components are presented. ► The control optimization model implementation aspects are discussed. -- Abstract: A simulation model of a two mode power-split hybrid electric vehicle (HEV) is proposed in this paper for the purpose of HEV dynamics analysis and control system design. The bond graph methodology is used to model dominant dynamic effects of the mechanical part of the HEV transmission. Simple quasi-static battery model, the environment model, the tire and the power losses model of a vehicle are included, as well. A low-level electric generator speed control loop is designed, which includes a PI controller tuned according to the symmetrical optimum tuning procedure. Finally, off-line optimization by conjugate gradient-based BPTT-like optimal control algorithm, which is based on the presented mathematical model, is also given in the paper.

  11. Electromagnetic Interference Issues of A Wireless Power Transmission Converter

    DEFF Research Database (Denmark)

    Khazraj, Hesam; Haji Bashi, Mazaher; Silva, Filipe Miguel Faria da

    2018-01-01

    field and the leakage current flowing through stray capacitors. In this paper, the EMI of wireless power transmission technology is highlighted and for the first time evaluated from a new perspective. The possible parasitic paths are identified simply. Additionally, effective high-frequency models......Many recent studies have focused on the inductive charging to transfer electrical power from a source to batteries without any electrical interface. The main problem with them is that inductive charging technologies may have electromagnetic compatibility (EMC) issues caused by the leakage magnetic...... for each part of the inductive charger are presented. At the first, the lowest EMI technology for wireless charging is chosen and simulated. To overcome the EMI and leakage current problems, this paper also suggests using a new passive EMI filter topology. Simulation results show the necessity...

  12. ELMO model predicts the price of electric power; ELMO-malli saehkoen hinnan ennustamiseksi

    Energy Technology Data Exchange (ETDEWEB)

    Antila, H. [Electrowatt-Ekono Oy, Helsinki (Finland)

    2001-07-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons.

  13. DESIGN AND DEVELOPMENT OF A 1/3 SCALE VERTICAL AXIS WIND TURBINE FOR ELECTRICAL POWER GENERATION

    Directory of Open Access Journals (Sweden)

    Altab Md. Hossain

    2007-12-01

    Full Text Available This research describes the electrical power generation in Malaysia by the measurement of wind velocity acting on the wind turbine technology. The primary purpose of the measurement over the 1/3 scaled prototype vertical axis wind turbine for the wind velocity is to predict the performance of full scaled H-type vertical axis wind turbine. The electrical power produced by the wind turbine is influenced by its two major part, wind power and belt power transmission system. The blade and the drag area system are used to determine the powers of the wind that can be converted into electric power as well as the belt power transmission system. In this study both wind power and belt power transmission system has been considered. A set of blade and drag devices have been designed for the 1/3 scaled wind turbine at the Thermal Laboratory of Faculty of Engineering, Universiti Industri Selangor (UNISEL. Test has been carried out on the wind turbine with the different wind velocities of 5.89 m/s, 6.08 m/s and 7.02 m/s. From the experiment, the wind power has been calculated as 132.19 W, 145.40 W and 223.80 W. The maximum wind power is considered in the present study.

  14. DESIGN AND DEVELOPMENT OF A 1/3 SCALE VERTICAL AXIS WIND TURBINE FOR ELECTRICAL POWER GENERATION

    Directory of Open Access Journals (Sweden)

    Altab Hossain

    2007-01-01

    Full Text Available This research describes the electrical power generation in Malaysia by the measurement of wind velocity acting on the wind turbine technology. The primary purpose of the measurement over the 1/3 scaled prototype vertical axis wind turbine for the wind velocity is to predict the performance of full scaled H-type vertical axis wind turbine. The electrical power produced by the wind turbine is influenced by its two major part, wind power and belt power transmission system. The blade and the drag area system are used to determine the powers of the wind that can be converted into electric power as well as the belt power transmission system. In this study both wind power and belt power transmission system has been considered. A set of blade and drag devices have been designed for the 1/3 scaled wind turbine at the Thermal Laboratory of Faculty of Engineering, Universiti Industri Selangor (UNISEL. Test has been carried out on the wind turbine with the different wind velocities of 5.89 m/s, 6.08 m/s and 7.02 m/s. From the experiment, the wind power has been calculated as 132.19 W, 145.40 W and 223.80 W. The maximum wind power is considered in the present study.

  15. Learning from the blackouts. Transmission system security in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    none

    2005-07-01

    Electricity market reform has fundamentally changed the environment for maintaining reliable and secure power supplies. Growing inter-regional trade has placed new demands on transmission systems, creating a more integrated and dynamic network environment with new real-time challenges for reliable and secure transmission system operation. Despite these fundamental changes, system operating rules and practices remain largely unchanged. The major blackouts of 2003 and 2004 raised searching questions about the appropriateness of these arrangements. Management of system security needs to be transformed to maintain reliable electricity services in this more dynamic operating environment. These challenges raise fundamental issues for policymakers. This publication presents case studies drawn from recent large-scale blackouts in Europe, North America, and Australia. It concludes that a comprehensive, integrated policy response is required to avoid preventable large-scale blackouts in the future.

  16. Requirements for a Hydrogen Powered All-Electric Manned Helicopter

    Science.gov (United States)

    Datta, Anubhav

    2012-01-01

    The objective of this paper is to set propulsion system targets for an all-electric manned helicopter of ultra-light utility class to achieve performance comparable to combustion engines. The approach is to begin with a current two-seat helicopter (Robinson R 22 Beta II-like), design an all-electric power plant as replacement for its existing piston engine, and study performance of the new all-electric aircraft. The new power plant consists of high-pressure Proton Exchange Membrane fuel cells, hydrogen stored in 700 bar type-4 tanks, lithium-ion batteries, and an AC synchronous permanent magnet motor. The aircraft and the transmission are assumed to remain the same. The paper surveys the state of the art in each of these areas, synthesizes a power plant using best available technologies in each, examines the performance achievable by such a power plant, identifies key barriers, and sets future technology targets to achieve performance at par with current internal combustion engines.

  17. Empirical assessment of market power in the Alberta wholesale electricity market

    International Nuclear Information System (INIS)

    Qu, F.

    2007-01-01

    In the 1990s, many countries began to unbundle regulated electricity monopolies into generation, transmission, distribution and retail companies. Transmission and distribution services remained regulated, but generation and retail services were open for competition. Wholesale and retail electricity markets were created. This paper presented a newly developed competitiveness index specifically for the Alberta market through a simple and standard economic approach. The Alberta Electric Utilities Act came into effect in January 1996. This paper described how the Alberta wholesale electricity market works and demonstrated how to model market power in the electricity market. In this study, power generating companies in Alberta were divided into 2 groups. The first group contained the 5 largest firms called strategic firms, while the other group contained the small generating companies called non-strategic firms or the competitive fringe. In the sample years 2003 and 2004, strategic firms withheld capacity when price was above marginal cost and behaved within the range of competitive pricing. They were more likely to price competitively than to use unilateral market power prices. In addition, firms had higher price-cost margins during the off-peak season. This paper explained in detail the reason for this unusual off-peak pattern. The index to measure a firm's strategic behaviour in the Alberta electricity market was developed according to price-cost margin data where firm-behaviour effect was distinguished from the demand-elasticity effect. It was concluded that policy-makers and regulations should consider the magnitude and source of market power when designing market structure, rules and trading practices. 9 refs., 5 tabs., 2 figs

  18. Relevance of HVDC for electrical power supply; Bedeutung der HGUein der Energieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Gambach, Herbert; Dorn, Joerg [Siemens AG, Erlangen (Germany). Power Transmission Solutions

    2012-07-01

    The finite availability of fossil energy, the turning away of many countries from nuclear power generation and the need for a limitation of CO{sub 2} emissions influence the future generation and transmission of electrical power in a significant way. In the long term these requirements can be met only by renewable energy sources, for instance solar power and wind. Another aspect is that power generation facilities are in many cases far-off from the load centers. This enforces reliable transmission systems with low losses over long distances. The high voltage direct current (HVDC) transmission complies with these demands in a beneficial way. This paper gives a short overview of the state-of-the-art and describes current developments. (orig.)

  19. The benefits of transmission expansions in the competitive electricity markets

    International Nuclear Information System (INIS)

    Bresesti, Paola; Calisti, Roberto; Cazzol, Maria Vittoria; Gatti, Antonio; Vaiani, Andrea; Vailati, Riccardo; Provenzano, Dario

    2009-01-01

    The paper presents an innovative method for assessing simultaneously technical and economic benefits of transmission expansions. This method takes into account the new needs of the transmission planning process for competitive electricity markets, in which benefits of major transmission expansions include: (a) improved reliability, (b) increased availability of efficient supply and (c) increased competition among suppliers. The fundamental elements of the REliability and MARKet (REMARK) tool, which we implemented based on the aforementioned method, are: a yearly probabilistic simulation of power system operation; use of the non-sequential Monte Carlo method to pick the operational status of the network elements; full network representation; adoption of the simplified direct current model; quantitative assessment of the reliability benefits through the expected energy not supplied index; simulation of the strategic behaviour of suppliers based on a simplified model that correlates the price-cost mark-up to structural market variables (residual supply index and demand); a quantitative assessment of ''economic'' benefits through the calculation of the social welfare index. A test case application of the tool on the IEEE 24-bus reliability test system shows that the method can assess benefits of transmission expansions, in addition to the overall social perspective, for each market zone as well as separately for consumers, producers and transmission system operators. The results emphasize that the effect of transmission expansions in mitigating market power may be significant and that a simple and traditional cost-based approach may lead to a wrong evaluation of benefits given by transmission expansions. (author)

  20. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    Energy Technology Data Exchange (ETDEWEB)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  1. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  2. 3 tons pure electric vehicles power system design based on Cruise

    Directory of Open Access Journals (Sweden)

    Xinyu Liu

    2017-01-01

    Full Text Available The pure electric minivan is different from electric car. Combined with a given vehicle, vehicle simulation model established in Cruise software, complete simulation by setting tasks for the selected models designed drivetrain. Simulation results show that: The design of the transmission ratio can best meet the performance requirements of the matching target power analysis and simulation of electric minivan provides a new way, with practical guidance.

  3. Multi-Objective Differential Evolution for Voltage Security Constrained Optimal Power Flow in Deregulated Power Systems

    Science.gov (United States)

    Roselyn, J. Preetha; Devaraj, D.; Dash, Subhransu Sekhar

    2013-11-01

    Voltage stability is an important issue in the planning and operation of deregulated power systems. The voltage stability problems is a most challenging one for the system operators in deregulated power systems because of the intense use of transmission line capabilities and poor regulation in market environment. This article addresses the congestion management problem avoiding offline transmission capacity limits related to voltage stability by considering Voltage Security Constrained Optimal Power Flow (VSCOPF) problem in deregulated environment. This article presents the application of Multi Objective Differential Evolution (MODE) algorithm to solve the VSCOPF problem in new competitive power systems. The maximum of L-index of the load buses is taken as the indicator of voltage stability and is incorporated in the Optimal Power Flow (OPF) problem. The proposed method in hybrid power market which also gives solutions to voltage stability problems by considering the generation rescheduling cost and load shedding cost which relieves the congestion problem in deregulated environment. The buses for load shedding are selected based on the minimum eigen value of Jacobian with respect to the load shed. In the proposed approach, real power settings of generators in base case and contingency cases, generator bus voltage magnitudes, real and reactive power demands of selected load buses using sensitivity analysis are taken as the control variables and are represented as the combination of floating point numbers and integers. DE/randSF/1/bin strategy scheme of differential evolution with self-tuned parameter which employs binomial crossover and difference vector based mutation is used for the VSCOPF problem. A fuzzy based mechanism is employed to get the best compromise solution from the pareto front to aid the decision maker. The proposed VSCOPF planning model is implemented on IEEE 30-bus system, IEEE 57 bus practical system and IEEE 118 bus system. The pareto optimal

  4. Space Solar Power Technology Demonstration for Lunar Polar Applications: Laser-Photovoltaic Wireless Power Transmission

    Science.gov (United States)

    Henley, M. W.; Fikes, J. C.; Howell, J.; Mankins, J. C.; Howell, Joe T. (Technical Monitor)

    2002-01-01

    Space Solar Power technology offers unique benefits for near-term NASA space science missions, which can mature this technology for other future applications. "Laser-Photo-Voltaic Wireless Power Transmission" (Laser-PV WPT) is a technology that uses a laser to beam power to a photovoltaic receiver, which converts the laser's light into electricity. Future Laser-PV WPT systems may beam power from Earth to satellites or large Space Solar Power satellites may beam power to Earth, perhaps supplementing terrestrial solar photo-voltaic receivers. In a near-term scientific mission to the moon, Laser-PV WPT can enable robotic operations in permanently shadowed lunar polar craters, which may contain ice. Ground-based technology demonstrations are proceeding, to mature the technology for this initial application, in the moon's polar regions.

  5. Outage Analysis of Cooperative Transmission with Energy Harvesting Relay: Time Switching versus Power Splitting

    Directory of Open Access Journals (Sweden)

    Guanyao Du

    2015-01-01

    Full Text Available This paper investigates the multiuser transmission network with an energy harvesting (EH cooperative relay, where a source transmits independent information to multiple destinations with the help of an energy constrained relay. The relay can harvest energy from the radio frequency (RF signals transmitted from the source, and it helps the multiuser transmission only by consuming the harvested energy. By adopting the time switching and the power splitting relay receiver architectures, we firstly propose two protocols, the time switching cooperative multiuser transmission (TSCMT protocol and the power splitting cooperative multiuser transmission (PSCMT protocol, to enable the simultaneous information processing and EH at the relay for the system. To evaluate the system performance, we theoretically analyze the system outage probability for the two proposed protocols and then derive explicit expressions for each of them, respectively. Numerical results are provided to demonstrate the accuracy of our analytical results and reveal that compared with traditional noncooperative scheme our proposed protocols are green solutions to offer reliable communication and lower system outage probability without consuming additional energy. In particular, for the same transmit power at the source, the PSCMT protocol is superior to the TSCMT protocol to obtain lower system outage probability.

  6. 76 FR 10353 - Locational Exchanges of Wholesale Electric Power

    Science.gov (United States)

    2011-02-24

    ... marketer instead of El Paso's merchant affiliate.\\12\\ \\11\\ El Paso Electric Co., 115 FERC ] 61,312 (2006... characteristics of locational exchanges and whether the definition set forth by Puget's Petition sufficiently... transmission between the exchange points; and (5) allow entities such as power marketers the ability to avoid...

  7. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  8. High-voltage direct current (HVDC) transmission - a key technology for our power supply

    International Nuclear Information System (INIS)

    Dorn, J.

    2016-01-01

    The phasing-out of nuclear power in some countries and the aspirations of reducing carbon dioxide emissions have far-reaching implications for electric power generation in Europe. In the future, renewable electricity generation will account for a considerable share of the energy mix, but this type of production is often far from the load centers. In Germany, for example, large quantities of wind energy are already generated in the north and in the North Sea, but large load centers are located several hundred kilometers south of there. This requires an expansion of the transmission network with innovative solutions. High-voltage direct-current (HVDC) transmission plays an important role, since it brings a number of advantages over conventional AC technology and makes certain requirements feasible, for example Cable transmission over longer distances. The lecture presents the advantages of HVDC, the semiconductors used as well as the basic functions and typical performance of the used converter topopologies. The plant configurations and main components are illustrated using current projects. (rössner) [de

  9. The electric power engineering handbook electric power transformer engineering

    CERN Document Server

    Harlow, James H

    2012-01-01

    Electric Power Transformer Engineering, Third Edition expounds the latest information and developments to engineers who are familiar with basic principles and applications, perhaps including a hands-on working knowledge of power transformers. Targeting all from the merely curious to seasoned professionals and acknowledged experts, its content is structured to enable readers to easily access essential material in order to appreciate the many facets of an electric power transformer.Topically structured in three parts, the book: * Illustrates for electrical engineers the relevant theories and pri

  10. Legislation development of the Spanish electric power act vol 4

    International Nuclear Information System (INIS)

    2002-01-01

    Of this Book: 1) Royal decree 277/2000, dated february 25th setting out the procedure for legal unbundling of the activities involved in the supply of electricity. 2) Royal decree 1663/2000, dated september 29th on the connection of photovoltaic installations to the low voltage network. 3) Royal decree 1955/2000, dated december 1st regulating transmission, distribution, and authorization procedures for electric power installations. 4) Royal decree 3490/2000, Dated december 29th setting the electricity tariff for 2001

  11. Transmission Integration | Grid Modernization | NREL

    Science.gov (United States)

    Transmission Integration Transmission Integration The goal of NREL's transmission integration integration issues and provide data, analysis, and models to enable the electric power system to more and finding solutions to address them to enable transmission grid integration. Capabilities Power

  12. A modular neural network scheme applied to fault diagnosis in electric power systems.

    Science.gov (United States)

    Flores, Agustín; Quiles, Eduardo; García, Emilio; Morant, Francisco; Correcher, Antonio

    2014-01-01

    This work proposes a new method for fault diagnosis in electric power systems based on neural modules. With this method the diagnosis is performed by assigning a neural module for each type of component comprising the electric power system, whether it is a transmission line, bus or transformer. The neural modules for buses and transformers comprise two diagnostic levels which take into consideration the logic states of switches and relays, both internal and back-up, with the exception of the neural module for transmission lines which also has a third diagnostic level which takes into account the oscillograms of fault voltages and currents as well as the frequency spectrums of these oscillograms, in order to verify if the transmission line had in fact been subjected to a fault. One important advantage of the diagnostic system proposed is that its implementation does not require the use of a network configurator for the system; it does not depend on the size of the power network nor does it require retraining of the neural modules if the power network increases in size, making its application possible to only one component, a specific area, or the whole context of the power system.

  13. Efficiency and environmental factors in the US electricity transmission industry

    International Nuclear Information System (INIS)

    Llorca, Manuel; Orea, Luis; Pollitt, Michael G.

    2016-01-01

    The electricity industry in most developed countries has been restructured over recent decades with the aim of improving both service quality and firm performance. Regulated segments (e.g. transmission) still provide the infrastructure for the competitive segments and represent a significant share of the total price paid by final customers. However there is a lack of empirical studies that analyse firms' performance in the electricity transmission sector. In this paper an empirical analysis of US electricity transmission companies is conducted for the period 2001–2009. We use alternative stochastic frontier models that allow us to identify the determinants of firms' inefficiency. These models also permit us to control for weather conditions, potentially one of the most decisive uncontrollable factors in electricity transmission. Our results suggest that weather conditions clearly have an influence on transmission costs and that there is room for improvement in the management of US electricity transmission systems. Regulators should also be aware that more adverse conditions generate higher levels of inefficiency, and that achieving long-term efficiency improvements tends to worsen firms' short-term relative performance. - Highlights: • We analyse firms' performance in the US electricity transmission industry. • Alternative SFA models are estimated to identify determinants of firms' efficiency. • Our results indicate that firms' efficiency has declined and diverged over time. • We find that more adverse conditions generate higher levels of inefficiency.

  14. Transmission access issues: Present and future

    International Nuclear Information System (INIS)

    Bahl, P.K.; Gray, R.G.

    1992-01-01

    In recent years, the electric industry has undergone dramatic changes as the federal and state governments have encouraged bulk power production by Independent Power Producers (IPPS) and Qualified Facilities (QFs). With decentralization and the consequent competition in the field of bulk power production, there has emerged the problem of non-utility generators (NUGS) and of transmission dependent utilities accessing the existing transmission systems owned by electric utilities. This paper presents current and future issues related to transmission access by IPPS, QFs and transmission dependent utilities. These issues include: (a) impact on system reliability, (b) impact of pricing strategies, (c) changes in state and federal regulations, (d) transmission proposals by various entities, (e) present access arrangements, (f) formation of the Western Systems Power Pool (WSPP), and (g) siting difficulties. The transmission access problem warrants consideration of transmission services, coordination among electric utilities, joint planning on a regional basis, and accommodation of IPPs and NUGs

  15. Third generation hybrid drive. Transmission-based integration of power electronics; Dritte Generation Hybridantrieb. Getriebenahe Integration der Leistungselektronik

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, Wolfgang [ZF Friedrichshafen AG, Friedrichshafen (DE). Hybridantriebe (F und E); Lutz, Steffen [BMW AG, Muenchen (Germany); Hensler, Alexander [Technische Univ. Chemnitz (Germany); Munding, Andreas [Liebherr Elektronik GmbH, Lindau (Germany); Thoben, Markus [Infineon Technologies AG, Warstein (Germany); Zeidler, Dietmar [Kemet Electronics GmbH, Landsberg am Lech (Germany)

    2011-06-15

    The power electronics components in today's hybrid vehicles are situated at different places in the vehicle - till now far away from harsh and hot surroundings. In order to develop an integrated solution near the transmission, ZF and BMW launched the research project 'Electric components for active power transmissions' (EfA). On the basis of an eight-speed full hybrid transmission and together with Infineon, Kemet, Liebherr, and the University of Technology of Chemnitz, they are developing a power electronics unit, which facilitates doubling the power density while increasing the operating temperature. The project EfA will be concluded in June 2011. (orig.)

  16. Proceedings of the Canadian Institute's BC power conference : maximizing opportunities in the evolving electricity sector

    International Nuclear Information System (INIS)

    2004-01-01

    This conference provided a forum for reviewing recent events and activities in British Columbia's electric power industry. Issues regarding energy supply, reliability, power generation, power distribution and power transmission were discussed along with the opportunities and challenges of developing renewable energy sources. Participants at the conference gained insight into strategies for determining the usefulness of an energy plan; assessing the prospects for new generation capacity; examining future whole sale markets; analyzing congestion problems; identifying import and export opportunities; planning for rate design and exploring the future supply on Vancouver Island. The possibilities for meeting the growing demand for electricity through an integrated electrical transmission system throughout the west coast, British Columbia, the Pacific Northwest and Alberta were examined along with financing structures and strategies of renewable energy projects. The role of regulators and their influence on electricity prices were also discussed. Resource planning guidelines were examined as well as other topics such as demand side management, energy conservation, the role of liquefied natural gas in power generation, and land use challenges for power generation. The conference featured 21 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs, figs

  17. Inter-regional transmission and power trading opportunities : making operating agreements work

    International Nuclear Information System (INIS)

    DesRosiers, D.

    2001-01-01

    International electric power transmission issues were the focus of this power point presentation which included a corporate profile of the Detroit Edison and International Transmission Company (ITC) and an overview of the midwest U.S. market and the Michigan-Ontario interconnections. ITC owns the transmission assets of its parent company Detroit Edison. It has a commitment with the Federal Energy Regulatory Commission (FERC) to be independent of all market participants within 18 months. ITC's peak load is 11,000 MW with 3 interconnections with Hydro One in Ontario, Consumers Energy in Michigan and First Energy in Ohio. The Ontario-Michigan interface includes four tie lines, 3 near Sarnia and 1 near Windsor, with a total capacity of 1,400 MW into Ontario and 2,000 MW out of Ontario. However, the amount of commercially available power is significantly inhibited by a phenomenon called loopflow, which is the difference between the scheduled and actual power flow. The problems and solutions to loopflow were also outlined. This presentation also briefly discussed the agreement reached between the Alliance RTO and the Midwest ISO that will allow the two to co-exist in the Midwest. tabs., figs

  18. Calculation of electrical and magnetic field in electric power transmission lines aiming project optimization, environmental impact and alternatives comparisons; O calculo dos campos eletrico e magnetico de L.T. visando a otimizacao do projeto, o impacto ambiental e a comparacao de alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Portela, Carlos M. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Moreno O, German [Antioquia Univ., Medellin (Colombia). Dept. de Engenharia Eletrica

    1995-12-31

    The optimization of overhead electric power transmission lines leads to compact projects in which the neighbourhood electric and magnetic field are a critical restriction. The Load Simulation Method enables the reliable calculation of such fields. Presented are equations for the application of such conditions. Results are presented 9 figs., 2 tabs., 10 refs.

  19. Major power system failures (Europe, USA) and deregulation of electricity markets

    International Nuclear Information System (INIS)

    Merlin, A.

    2004-01-01

    The year 2003 was marked by several electric power blackouts which affected major power systems in the world, and gave rise to many opinions about possible links with developments brought by the opening of the electricity markets. At first the paper presents the outages experienced by North America or August 14 and by Switzerland and Italy on September 28, 2003. Feedback on previous electric power blackouts makes possible to find out already known lessons, then to bring out how the latest blackouts may reveal similarities or differences towards developments brought by the opening of the electricity markets occurred ire the last ten years. Finally, seen from the transmission system operator of a european country within the context of continued institutional developments, the paper points out significant items which must be considered to prevent possible further blackouts. (author)

  20. Assessment of electricity demand-supply in health facilities in resource-constrained settings : optimization and evaluation of energy systems for a case in Rwanda

    NARCIS (Netherlands)

    Palacios, S.G.

    2015-01-01

    In health facilities in resource-constrained settings, a lack of access to sustainable and reliable electricity can result on a sub-optimal delivery of healthcare services, as they do not have lighting for medical procedures and power to run essential equipment and devices to treat their patients.

  1. Electricity supply. The effects of competitive power purchases are not yet certain

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Wood, David G.; Bausell, Charles W. Jr.; Farah, Philip G.; Alexander, Alice M.; Griffes, Peter H.; Jorritsma, James S.; Skud, Bruce; Dunbrack, Linda W.

    1990-08-01

    Most electricity in the United States is produced by utilities that own and operate facilities for the generation, transmission, and distribution of power. Utilities traditionally have operated as regulated monopolists, each within an established geographic area. In return, utilities have an obligation to provide reliable electricity to all consumers in their territory at a reasonable price. Many utility companies also participate in power pools, under which they may purchase electricity from one another to meet requirements. Utilities are allowed to earn a return on plants they own and operate, while the costs of purchased electricity are passed directly to consumers. To encourage the development of alternative energy resources, the Public Utility Regulatory Policies Act of 1978, as amended, (PURPA) required utilities to purchase power offered by qualifying facilities at a price not exceeding the utilities' avoided cost of generating it or purchasing it from another source. In part to help state regulators and utilities determine utilities' avoided costs and to help sort through a flood of bids, competitive bidding, which allows market forces to help determine prices, has emerged as a means of purchasing power from nonutility generators. Because several years are often required to construct generating sources, utilities have little operating experience with competitively purchased electricity. Thus, the effects of competitive power purchases on the long-term reliability of electric service - which is affected by the reliability of all sources and transmission and distribution facilities are not yet certain and difficult to assess. Among the three utilities reviewed, only at Central Maine Power have sources of competitively purchased power entered service, and they have operated reliably. However, each utility reviewed has accepted bids that were subsequently withdrawn, for financial or other reasons, prior to scheduled service dates. When selecting nonutility

  2. The development of a subsea power transmission system for deep water boosting applications

    Energy Technology Data Exchange (ETDEWEB)

    Godinho, C.A.F. [Pirelli Cabos S.A. (Brazil); Campagnac, L.A. [Siemens S.A. (Brazil); Nicholson, A. [Tronic Electronics Services Ltd. (WEC); Magalhaes, W.M. de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    1996-12-31

    This paper presents the development of a sub sea power transmission in medium voltage and variable frequency, as a key system for application of Boosting technology and for electrical submersible Pumping in deep water wells. This work focuses on the design and manufacture of sub sea power cables and transformers for 1,000 m water depth. 8 refs., 6 figs.

  3. Wireless Sensor Network for Electric Transmission Line Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alphenaar, Bruce

    2009-06-30

    . On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization

  4. Evaluation of all-electric secondary power for transport aircraft

    Science.gov (United States)

    Murray, W. E.; Feiner, L. J.; Flores, R. R.

    1992-01-01

    This report covers a study by Douglas Aircraft Company (DAC) of electrical power systems for advanced transport aircraft based upon an all-electric design concept. The concept would eliminate distributed hydraulic and pneumatic secondary power systems, and feature an expanded secondary electrical power system redesigned to supply power to the loads customarily supplied by hydraulic or pneumatic power. The initial study was based on an advanced 20-kHz electrical power transmission and distribution system, using a system architecture supplied by NASA-Lewis Research Center for twin-engine aircraft with many advanced power conversion concepts. NASA-LeRC later requested DAC to refocus the study on 400-Hz secondary power distribution. Subsequent work was based on a three-engine MD-11 aircraft, selected by DAC as a baseline system design that would provide data for the comparative cost/benefit analysis. The study concluded that the 20-kHz concept produced many expected benefits, and that the all-electric trijet weight savings on hardware redesign would be 2,304 pounds plus a 2.1-percent fuel reduction and resized for a total weight reduction of 11,000 pounds. Cost reductions for a fleet of 800 aircraft in a 15-year production program were estimated at $76.71 million for RDT&E; $2.74 million per aircrat for production; $9.84 million for nonrecurring expenses; $120,000 per aircraft for product support; and $300,000 per aircraft per year for operating and maintenance costs, giving a present value of $1.914 billion saved or a future value of $10.496 billion saved.

  5. Current issues and strategies for transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Isaacs, A.L. [Electranix, Winnipeg, MB (Canada); Rajapakse, A. [Manitoba Univ., Winnipeg, MB (Canada)

    2008-07-01

    Following the widespread deregulation of the electric power industry in the early 1990s, significant changes occurred in the regulatory and planning environments of the industry. Several regions of North America remain fully or partially regulated in the traditional sense including most Canadian provinces, except for Alberta and Ontario. Although the Mexican system has separate generation and transmission companies and current restructuring efforts are underway, all companies are state-owned, and private investment in energy is heavily constrained by the Mexican constitution. In these regulated regions, traditional generation and transmission expansion planning methods remain in use. This paper presented an overview of current trends in transmission planning strategies that have evolved in response to the restructuring of the power industry, and a conceptual framework of a procedure that would guide planners faced with the challenges of incorporating large scale wind generation in deregulated environments. The paper provided background information on the effect of deregulation on transmission planning. Planning strategies that were discussed included quantifying risk to help identify best alternatives; use of reference systems to estimate generator costs and reduce uncertainty; project based transmission expansion; transmission construction ahead of generation; and generation ahead of transmission. The impact of wind on transmission planning as well as future work addressing challenges posed by wind were also addressed. Research is continuing in this area to illustrate the concepts proposed through a detailed case study. 15 refs., 2 figs.

  6. Power systems locational marginal pricing in deregulated markets

    Science.gov (United States)

    Wang, Hui-Fung Francis

    Since the beginning of the 1990s, the electricity business is transforming from a vertical integrating business to a competitive market operations. The generation, transmission, distribution subsystem of an electricity utility are operated independently as Genco (generation subsystem), Transco (transmission subsystem), and Distco (distribution subsystem). This trend promotes more economical inter- and intra regional transactions to be made by the participating companies and the users of electricity to achieve the intended objectives of deregulation. There are various types of electricity markets that are implemented in the North America in the past few years. However, transmission congestion management becomes a key issue in the electricity market design as more bilateral transactions are traded across long distances competing for scarce transmission resources. It directly alters the traditional concept of energy pricing and impacts the bottom line, revenue and cost of electricity, of both suppliers and buyers. In this research, transmission congestion problem in a deregulated market environment is elucidated by implementing by the Locational Marginal Pricing (LMP) method. With a comprehensive understanding of the LMP method, new mathematical tools will aid electric utilities in exploring new business opportunities are developed and presented in this dissertation. The dissertation focuses on the development of concept of (LMP) forecasting and its implication to the market participants in deregulated market. Specifically, we explore methods of developing fast LMP calculation techniques that are differ from existing LMPs. We also explore and document the usefulness of the proposed LMP in determining electricity pricing of a large scale power system. The developed mathematical tools use of well-known optimization techniques such as linear programming that are support by several flow charts. The fast and practical security constrained unit commitment methods are the

  7. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  8. Proceedings of the 13. SNPTEE: Brazilian seminar on electric power production and transmission. Group 1: Hydraulic production (GPH); Anais do 13. SNPTEE: Seminario nacional de producao e transmissao de energia eletrica. Grupo 1: Producao hidraulica (GPH)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This book collects the works presented during the 12. national seminar on electric power generation and transmission. The group I papers collects works concerning hydroelectric power generation, the most common form of electric power generation Brazil due to the country`s natural resources which are favourable to this type of generation. Several case studies are presented as well as the new trends for this generation form in Brazil

  9. Design of Electricity Markets for Efficient Balancing of Wind Power Generation

    OpenAIRE

    Scharff, Richard

    2015-01-01

    Deploying wind power to a larger extent is one solution to reduce negative environmental impacts of electric power supply. However, various challenges are connected with increasing wind power penetration levels. From the perspective of transmission system operators, this includes balancing of varying as well as - to some extent - uncertain generation levels. From the perspective of power generating companies, changes in the generation mix will affect the market's merit order and, hence, their...

  10. Electrical and Biological Effects of Transmission Lines: A Review.

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jack M.

    1989-06-01

    This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

  11. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  12. The conflicting logics of the Europe of electric power

    International Nuclear Information System (INIS)

    Audigier, Pierre

    2013-01-01

    As the European Union has no explicit competency in the field of energy policy, the author outlines that two logics exist which constrain the freedom of action of member states: the logics of competition which is the exclusive competency of the European Commission, and the logics of exemption granted to renewable energies. The author aims at highlighting the always exacerbating contradiction between these both logics, and the perverse effect of this contradiction on the evolution of the European electric power system. He comments the European and German policies regarding renewable energies, and outlines the chaos they create. He comments the position of the European commission with respect to renewable energies, the status of development of renewable energies in Germany and in border countries, and finally outlines that the European market will be always more disturbed by the priority given to intermittent electric power sources

  13. Electric traction motion power and energy supply : basics and practical experience

    CERN Document Server

    Steimel, Andreas

    2011-01-01

    This book has evolved from the lecture series ""Elektrische Bahnen" (""Electric railways") which has been held at Ruhr-Universität Bochum since 1996. Its primary audience are students of electrical energy technologies, control engineering and mechanical engineering as well as young engineers of electrical engineering, especially in the fields of power electronics, in railway industry and in railway-operating companies. The book intends to convey mechanical fundamentals of electric railway propulsion, which includes rail-bound guidance, transmission of traction effort from wheel to rail under t

  14. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.

    Energy Technology Data Exchange (ETDEWEB)

    Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

    2005-11-01

    This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

  15. Description of the electric power and energy trade in Finland

    International Nuclear Information System (INIS)

    Komulainen, K.

    1992-01-01

    The Finnish State has traditionally controlled the import of electricity, larger related investments and pricing. Lately, a market orientated economic policy has influenced energy policy and the amount of state control has gradually decreased. Decisions have yet to be made with regard to the fifth nuclear power reactor. The paper deals briefly with the subjects of the electric power, natural gas and oil markets. Finland's transmission network has connections to the former Russia and the Baltic countries. According to agreements within the European Community, Finland must now make changes in its electric power supply structure. Competition will be encouraged and monopolies discouraged. Pricing shall be transparent, and power plants must present written documentation for their management system, price regulations etc. A law must be passed to legitimate trade across the country's borders. Emphasis will be laid on energy conservation and energy research and consultant services. It is claimed that Finland's level of technology in this area lives up to international standards. (AB)

  16. SAInt – A novel quasi-dynamic model for assessing security of supply in coupled gas and electricity transmission networks

    NARCIS (Netherlands)

    Pambour, Kwabena Addo; Cakir Erdener, Burcin; Bolado-Lavin, Ricardo; Dijkema, Gerhard P.J.

    2017-01-01

    The integration of renewable energy sources into existing electric power systems is connected with an increased interdependence between natural gas and electricity transmission networks. To analyse this interdependence and its impact on security of supply, we developed a novel quasi-dynamic

  17. One-dimensional pressure transfer models for acoustic-electric transmission channels

    Science.gov (United States)

    Wilt, K. R.; Lawry, T. J.; Scarton, H. A.; Saulnier, G. J.

    2015-09-01

    A method for modeling piezoelectric-based ultrasonic acoustic-electric power and data transmission channels is presented. These channels employ piezoelectric disk transducers to convey signals across a series of physical layers using ultrasonic waves. This model decomposes the mechanical pathway of the signal into individual ultrasonic propagation layers which are generally independent of the layer's adjacent domains. Each layer is represented by a two-by-two traveling pressure wave transfer matrix which relates the forward and reverse pressure waves on one side of the layer to the pressure waves on the opposite face, where each face is assumed to be in contact with a domain of arbitrary reference acoustic impedance. A rigorous implementation of ultrasonic beam spreading is introduced and implemented within applicable domains. Compatible pressure-wave models for piezoelectric transducers are given, which relate the electric voltage and current interface of the transducer to the pressure waves on one mechanical interface while also allowing for passive acoustic loading of the secondary mechanical interface. It is also shown that the piezoelectric model's electrical interface is compatible with transmission line parameters (ABCD-parameters), allowing for connection of electronic components and networks. The model is shown to be capable of reproducing the behavior of realistic physical channels.

  18. Competitive electric power markets and grid reliability : something has changed during the past decade

    International Nuclear Information System (INIS)

    Fluckiger, K.

    2005-01-01

    This white paper reviewed some of the fundamental changes in the way in which electricity is provided to customers. Previously, electricity was delivered by integrated electric utilities that owned both generation and transmission and directly served their customers. Restructuring altered the rules that govern control, operation, ownership and regulation of the industry. The traditional integrated utility has been disaggregated. Wholesale electricity costs are no longer regulated and prices are now set by supply and demand in a market context. Generation investment decisions are based on future expectations of market performance. It was suggested that transmission should become a facilitator of the competitive market. Inter-ties are an essential part of a competitive market, as a means to import power when needed and to export surplus energy. The role of transmission in facilitating new generation by providing non-discriminatory and efficient transport to the market was discussed. It was noted that the lack of transmission investment is resulting in economic penalties, rising losses and constraints on more economic generators. Transmission congestion is counterproductive to the interests of customers. A move away from regional planning to a recognition of the wider interconnectedness of the system was recommended. The current practice of deferring necessary maintenance as a way to generate short-term profit was examined. It was noted that despite the need for new transmission infrastructure, investment in merchant alternating current projects has been slow to materialize. Other challenges to transmission included the uncertainty of regulatory processes and investment recovery as well as the unpredictability of flow patterns in the bulk power system. It was concluded that competitive generation markets will not work with an inadequate transmission infrastructure. Transmission enables new generation by ensuring non-discriminatory and efficient transport to market

  19. Security-Constrained Resource Planning in Electricity Market

    International Nuclear Information System (INIS)

    Roh, Jae Hyung; Shahidehpour, Mohammad; Yong Fu

    2007-06-01

    We propose a market-based competitive generation resource planning model in electricity markets. The objective of the model is to introduce the impact of transmission security in a multi-GENCO generation resource planning. The proposed approach is based on effective decomposition and coordination strategies. Lagrangian relaxation and Benders decomposition like structure are applied to the model. Locational price signal and capacity signal are defined for the simulation of competition among GENCOs and the coordination of security between GENCOs and the regulatory body (ISO). The numerical examples exhibit the effectiveness of the proposed generation planning model in electricity markets.

  20. Liberalization of power generation sector in the Croatian electricity market

    International Nuclear Information System (INIS)

    Viskovic, Alfredo

    2005-01-01

    The electricity market liberalization and the restructuring of power utilities eventually leads to the establishment of a single electricity market in Europe, which is especially important for efficiency gains in electricity generation coupled with increased security of supply, economic competitiveness and fulfillment of environmental requirements. The European electricity market Directives as well as the Energy Community Treaty for South East Europe (legislative Menu) have remarkable impact on the restructuring of the Croatian power sector and the development of electricity generation. The Croatian model of restructuring includes legal un bundling (in the ownership of one holding company - Hrvatska Elektroprivreda (HEP)). The operation of HEP Group and its subsidiaries in the conditions of partially opened electricity market in an important element that shapes the interactions of competitive activities and regulated activities in the environment influenced by exogenous factors a thirteen percent electricity are controlled by the Energy Market Operator (MO), the Transmission System Operator (TSO) and the Energy Regulatory Agency (CERA). The introduction of eligible procedures and newly created operative procedures for power system operation, are creating completely new conditions for competition in the power generation sector, where almost all power plants are owned by HEP. New generating capacities in Croatia can be built through tendering and licensing procedures carried out by the Regulator. Electricity prices are still regulated by the Government (below the cost reflective level), there is a small share of industrial consumers and the annual electricity production is 12 TWh, with relatively large share of hydro plants. All these have implications on the development of the power generation sector in Croatia as well as on electricity market operation. The subject matter of this paper is an impact of power system restructuring and electricity market opening on the

  1. Transmission investment in the Peruvian electricity market: Theory and applications

    International Nuclear Information System (INIS)

    Ruiz, Erix; Rosellón, Juan

    2012-01-01

    This research presents an application of the mechanism in (HRV) to promote electricity transmission network expansion in the Peruvian electricity transmission system known as SEIN (Sistema Eléctrico Interconectado Nacional). The HRV mechanism combines the merchant and regulatory approaches to promote investment into transmission grids. This mechanism gives incentives for efficient investment in expansion of the network by rebalancing over time the fixed and variable charges of a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of Financial Transmission Rights (FTRs) for the congested lines. The mechanism is applied for 103 nodes of the SEIN using detailed characteristics of generators, nodes and transmission lines. Under Laspeyres weights and linear cost of expansion of transmission capacity, it is shown that prices converge to lower price levels as a result of increased transmission capacity.

  2. Efficient design of multituned transmission line NMR probes: the electrical engineering approach.

    Science.gov (United States)

    Frydel, J A; Krzystyniak, M; Pienkowski, D; Pietrzak, M; de Sousa Amadeu, N; Ratajczyk, T; Idzik, K; Gutmann, T; Tietze, D; Voigt, S; Fenn, A; Limbach, H H; Buntkowsky, G

    2011-01-01

    Transmission line-based multi-channel solid state NMR probes have many advantages regarding the cost of construction, number of RF-channels, and achievable RF-power levels. Nevertheless, these probes are only rarely employed in solid state-NMR-labs, mainly owing to the difficult experimental determination of the necessary RF-parameters. Here, the efficient design of multi-channel solid state MAS-NMR probes employing transmission line theory and modern techniques of electrical engineering is presented. As technical realization a five-channel ((1)H, (31)P, (13)C, (2)H and (15)N) probe for operation at 7 Tesla is described. This very cost efficient design goal is a multi port single coil transmission line probe based on the design developed by Schaefer and McKay. The electrical performance of the probe is determined by measuring of Scattering matrix parameters (S-parameters) in particular input/output ports. These parameters are compared to the calculated parameters of the design employing the S-matrix formalism. It is shown that the S-matrix formalism provides an excellent tool for examination of transmission line probes and thus the tool for a rational design of these probes. On the other hand, the resulting design provides excellent electrical performance. From a point of view of Nuclear Magnetic Resonance (NMR), calibration spectra of particular ports (channels) are of great importance. The estimation of the π/2 pulses length for all five NMR channels is presented. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. Some problems relating to the transmission of electrical power at very high voltage

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, A

    1965-01-01

    Some of the technical and economic factors which influence the choice of a transmission system, particularly a very high voltage one, are discussed. The stability of transmission overvoltages at mains frequency and their control by means of compensating reactances is described. Overvoltages due to circuit-breaker operation and those of atmospheric origin, and appropriate protective devices, the behaviour of equipment at 750 kV, and problems of testing are included. Finally, the 735 kV network now being installed to carry 5300 MW of hydroelectric power 650 km from the Manicouagan River to Quebec and Montreal is described.

  4. Electric power annual, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. The 1991 edition has been enhanced to include statistics on electric utility demand-side management and nonutility supply. ''The US Electric Power Industry at a Glance'' section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms

  5. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  6. Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices

    Science.gov (United States)

    Chassin, David P [Pasco, WA; Donnelly, Matthew K [Kennewick, WA; Dagle, Jeffery E [Richland, WA

    2011-12-06

    Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices are described. In one aspect, an electrical power distribution control method includes providing electrical energy from an electrical power distribution system, applying the electrical energy to a load, providing a plurality of different values for a threshold at a plurality of moments in time and corresponding to an electrical characteristic of the electrical energy, and adjusting an amount of the electrical energy applied to the load responsive to an electrical characteristic of the electrical energy triggering one of the values of the threshold at the respective moment in time.

  7. New nuclear power plants and the electricity market competition

    International Nuclear Information System (INIS)

    Ruska, M.; Koreneff, G.

    2009-11-01

    The study assesses the effects the different nuclear power plant projects would have on crossownership, market concentration and market power in electricity market. The analyses are given both for Finnish and Nordic power markets. The authors feel that the electricity market should primarily be viewed as a common Nordic market in the future. During 2000 to 2008 the hours when Finland was an own price area ranged from 1 % to 29 % as annual averages. In the future it will be more and more seldom that Finland will become an own deficit price area, because the cross-border transmission capacity to Sweden will increase as will Finnish electricity production capacity. In addition, the extension of Nord Pool to the Baltic will increase the size of the market. The ownership of power plants is typically organized through power share companies in Finland. Two of the three nuclear power plant projects are joint ventures with several electricity producers and consumers. The current ownership relations and what effects the new projects might have on them were analyzed in this study. The competitiveness of different electricity production forms in the future was assessed using different market scenarios based on varying demand expectations. The capacity structure was assumed to stay quite unchanged, where the biggest change is expected to come from new renewable power capacity due to EU targets. Conventional condensing power production will decrease and Nordic electricity exports will increase in the future. The market concentration would increase in Finland with new nuclear plants, the most if Fortum were the builder. Vattenfall has a decidedly larger electricity production in the Nordic countries than Fortum, and Vattenfall's capacity would be unchanged by the new planned nuclear plants. The nuclear power plant projects do not therefore increase market concentration significantly on a Nordic level. Nuclear power is not used for day or hour regulation in Finland, which means

  8. Power Transmission Scheduling for Generators in a Deregulated Environment Based on a Game-Theoretic Approach

    Directory of Open Access Journals (Sweden)

    Bingtuan Gao

    2015-12-01

    Full Text Available In a deregulated environment of the power market, in order to lower their energy price and guarantee the stability of the power network, appropriate transmission lines have to be considered for electricity generators to sell their energy to the end users. This paper proposes a game-theoretic power transmission scheduling for multiple generators to lower their wheeling cost. Based on the embedded cost method, a wheeling cost model consisting of congestion cost, cost of losses and cost of transmission capacity is presented. By assuming each generator behaves in a selfish and rational way, the competition among the multiple generators is formulated as a non-cooperative game, where the players are the generators and the strategies are their daily schedules of power transmission. We will prove that there exists at least one pure-strategy Nash equilibrium of the formulated power transmission game. Moreover, a distributed algorithm will be provided to realize the optimization in terms of minimizing the wheeling cost. Finally, simulations were performed and discussed to verify the feasibility and effectiveness of the proposed non-cooperative game approach for the generators in a deregulated environment.

  9. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with AC Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  10. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with Ac Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  11. Market power in deregulated electricity markets : a review of the recent experience

    International Nuclear Information System (INIS)

    Mullin, K.; Trebilcock, M.

    2003-01-01

    Traditionally, the electric power industry has been headed by vertically integrated monopolies that combined power generation, transmission, distribution and retail components of electricity supply. Electric utilities were generally publicly owned and subjected to rate-of-return regulation. The industry in many jurisdictions is now being unbundled with the advent of new generation technology that has led the way for small generation facilities to produce competitively priced electricity and enter the electricity market. Regulators have recognized that private monopolies had little incentive to minimize costs resulting in inefficient operation of the utility. The challenge lies in designing a system that truly promotes competitive markets. This presentation examined the characteristics of market power and described the experiences of several jurisdictions in dealing with possible market power abuse. The presentation also presented lessons learned in California, Pennsylvania, New Jersey, Maryland, New Zealand, Alberta, and Ontario that could be applied to future electricity markets. In conclusion, the authors state that governments should use caution when implementing across-the-board price caps, because doing so discourages new investment in generation capacity.152 refs

  12. Electric power infrastructure in Asia and the Pacific: economics and investment opportunity

    International Nuclear Information System (INIS)

    Sudarsono, B.S.; Saha, P.C.

    1995-01-01

    The purpose of this paper is to discuss the status and potential of the Asia Pacific electric power infrastructure, including the transmission and distribution system, to highlight some of the most relevant issues in the sector and to look at the prospect of investment opportunity for the private sector in the power industry

  13. HVDC transmission from isorated nuclear power plant

    International Nuclear Information System (INIS)

    Takenaka, Kiyoshi; Takasaki, Masahiro; Ichikawa, Tatemi; Hayashi, Toshiyuki

    1985-01-01

    HVDC transmission directly from nuclear power plant is considered as one of the patterns of long distance and large capacity transmission system. This reports considers two route HVDC transmission from PWR type nuclear power plant, and analyzes dynamic response characteristics due to bus fault, main protection failure and etc. using the AC-DC Power System Simulator. (author)

  14. Electric power generation

    International Nuclear Information System (INIS)

    Pinske, J.D.

    1981-01-01

    Apart from discussing some principles of power industry the present text deals with the different ways of electric power generation. Both the conventional methods of energy conversion in heating and water power stations and the facilities for utilizing regenerative energy sources (sun, wind, ground heat, tidal power) are considered. The script represents the essentials of the lecture of the same name which is offered to the students of the special subject 'electric power engineering' at the Fachhochschule Hamburg. It does not require any special preliminary knowledge except for the general principles of electrical engineering. It is addressing students of electrical engineering who have passed their preliminary examination at technical colleges and universities. Moreover, it shall also be of use for engineers who want to obtain a quick survey of the structure and the operating characteristics of the extremely different technical methods of power generation. (orig.) [de

  15. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  16. A Modular Neural Network Scheme Applied to Fault Diagnosis in Electric Power Systems

    Directory of Open Access Journals (Sweden)

    Agustín Flores

    2014-01-01

    Full Text Available This work proposes a new method for fault diagnosis in electric power systems based on neural modules. With this method the diagnosis is performed by assigning a neural module for each type of component comprising the electric power system, whether it is a transmission line, bus or transformer. The neural modules for buses and transformers comprise two diagnostic levels which take into consideration the logic states of switches and relays, both internal and back-up, with the exception of the neural module for transmission lines which also has a third diagnostic level which takes into account the oscillograms of fault voltages and currents as well as the frequency spectrums of these oscillograms, in order to verify if the transmission line had in fact been subjected to a fault. One important advantage of the diagnostic system proposed is that its implementation does not require the use of a network configurator for the system; it does not depend on the size of the power network nor does it require retraining of the neural modules if the power network increases in size, making its application possible to only one component, a specific area, or the whole context of the power system.

  17. Economic impact of electric power limitation in Rio de Janeiro

    International Nuclear Information System (INIS)

    Schilling, M.Th.; Gomes, P.; Aires, J.C.O.

    1993-01-01

    The metropolitan region of Rio de Janeiro constitutes an important center of charge of Brazil in relation to electric power consumption. This region is essentially served by light, enterprise concessionary responsible by sub transmission and distribution of energy to residential, commercial and industrial consumers. 9 refs, 10 tabs

  18. Transmission Line Adapted Analytical Power Charts Solution

    Science.gov (United States)

    Sakala, Japhet D.; Daka, James S. J.; Setlhaolo, Ditiro; Malichi, Alec Pulu

    2017-08-01

    The performance of a transmission line has been assessed over the years using power charts. These are graphical representations, drawn to scale, of the equations that describe the performance of transmission lines. Various quantities that describe the performance, such as sending end voltage, sending end power and compensation to give zero voltage regulation, may be deduced from the power charts. Usually required values are read off and then converted using the appropriate scales and known relationships. In this paper, the authors revisit this area of circle diagrams for transmission line performance. The work presented here formulates the mathematical model that analyses the transmission line performance from the power charts relationships and then uses them to calculate the transmission line performance. In this proposed approach, it is not necessary to draw the power charts for the solution. However the power charts may be drawn for the visual presentation. The method is based on applying derived equations and is simple to use since it does not require rigorous derivations.

  19. Investments and price formation in a liberalized electric power market. Appendices

    International Nuclear Information System (INIS)

    Morthorst, P.E.

    2005-06-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. The appendix volume of the project report contains detailed descriptions of the three models that are used: the Balmorel model, the investment model, and the MARS model. The Balmorel model is a partial equilibrium model that describes a coherent, international electric power system and combined heat and power system. The model was developed in 2000 through international co-operation with the aim to have a model for analysing international aspects in the Baltic area. The investment model analyses and models the investment decisions in a liberalized Nordic electric power market. It is an exogenous model constructed outside the Balmorel model but uses the price pictures from the Balmorel model as input. MARS (MARket Simulation) is Eltra's (a Danish electric power transmission company) market model for simulating prices, production, demand and exchanges in the power market. The model covers the Nordic countries (Nord Pool) and Northern Germany. (LN)

  20. Parameters optimization for magnetic resonance coupling wireless power transmission.

    Science.gov (United States)

    Li, Changsheng; Zhang, He; Jiang, Xiaohua

    2014-01-01

    Taking maximum power transmission and power stable transmission as research objectives, optimal design for the wireless power transmission system based on magnetic resonance coupling is carried out in this paper. Firstly, based on the mutual coupling model, mathematical expressions of optimal coupling coefficients for the maximum power transmission target are deduced. Whereafter, methods of enhancing power transmission stability based on parameters optimal design are investigated. It is found that the sensitivity of the load power to the transmission parameters can be reduced and the power transmission stability can be enhanced by improving the system resonance frequency or coupling coefficient between the driving/pick-up coil and the transmission/receiving coil. Experiment results are well conformed to the theoretical analysis conclusions.

  1. Fabrication and electric measurements of nanostructures inside transmission electron microscope

    International Nuclear Information System (INIS)

    Chen, Qing; Peng, Lian-Mao

    2011-01-01

    Using manipulation holders specially designed for transmission electron microscope (TEM), nanostructures can be characterized, measured, modified and even fabricated in-situ. In-situ TEM techniques not only enable real-time study of structure-property relationships of materials at atomic scale, but also provide the ability to control and manipulate materials and structures at nanoscale. This review highlights in-situ electric measurements and in-situ fabrication and structure modification using manipulation holder inside TEM. -- Research highlights: → We review in-situ works using manipulation holder in TEM. → In-situ electric measurements, fabrication and structure modification are focused. → We discuss important issues that should be considered for reliable results. → In-situ TEM is becoming a very powerful tool for many research fields.

  2. Electricity transmission pricing. How contracts must reflect costs

    International Nuclear Information System (INIS)

    Shuttleworth, G.

    1996-01-01

    Two basic structures of transmission systems are distinguished: transmission channels offered through an integrated electric utility and open access offered over an independent network. The first structure allows the application of 'top-down pricing', where transmission prices are derived from customer tariffs less avoidable generation costs. Transmission prices in the second structure must be derived from a 'bottom-up' analysis of transmission costs, including building capacity, marginal losses, and congestion. 5 refs

  3. Transmission capacities and competition in Western European electricity market

    International Nuclear Information System (INIS)

    Spiridonova, Olga

    2016-01-01

    The integration of national electricity markets into a single European one is expected to reduce the ability of dominant players to exercise market power. This paper investigates whether or not existing transmission capacities of cross-border interconnectors are sufficient to achieve this result and create vigorous competition in the market. A model with two decision levels is used. On the first level profit maximizing generators play Cournot game against each other. On the last level the system operator clears the market and determines flows in the network to maximize social welfare subject to a set of physical constraints. As each strategic generator anticipates her impact on equilibrium prices and congestion in the system, her optimization problem is subject to equilibrium constraints from the system operator's problem. The analysis demonstrates that interconnector capacities in Western Europe are insufficient for integration alone to reduce the exercise of market power. I compare several possible competition-enhancing policies: expansion of interconnectors and different scenarios of national markets’ restructuring. I show that although increase of line capacity is a useful tool to stimulate competition in an integrated market, it is not a substitute for the restructuring of large players. - Highlights: •The ability of integration to reduce market power depends on transmission capacities. •In the model firms compete in quantities, know their impact on prices and congestion. •In Western Europe integration will not diminish market power. •Line extension stimulates competition but is not a substitute for the regulation.

  4. Stochastic risk-averse coordinated scheduling of grid integrated energy storage units in transmission constrained wind-thermal systems within a conditional value-at-risk framework

    International Nuclear Information System (INIS)

    Hemmati, Reza; Saboori, Hedayat; Saboori, Saeid

    2016-01-01

    In recent decades, wind power resources have been integrated in the power systems increasingly. Besides confirmed benefits, utilization of large share of this volatile source in power generation portfolio has been faced system operators with new challenges in terms of uncertainty management. It is proved that energy storage systems are capable to handle projected uncertainty concerns. Risk-neutral methods have been proposed in the previous literature to schedule storage units considering wind resources uncertainty. Ignoring risk of the cost distributions with non-desirable properties may result in experiencing high costs in some unfavorable scenarios with high probability. In order to control the risk of the operator decisions, this paper proposes a new risk-constrained two-stage stochastic programming model to make optimal decisions on energy storage and thermal units in a transmission constrained hybrid wind-thermal power system. Risk-aversion procedure is explicitly formulated using the conditional value-at-risk measure, because of possessing distinguished features compared to the other risk measures. The proposed model is a mixed integer linear programming considering transmission network, thermal unit dynamics, and storage devices constraints. The simulations results demonstrate that taking the risk of the problem into account will affect scheduling decisions considerably depend on the level of the risk-aversion. - Highlights: • Risk of the operation decisions is handled by using risk-averse programming. • Conditional value-at-risk is used as risk measure. • Optimal risk level is obtained based on the cost/benefit analysis. • The proposed model is a two-stage stochastic mixed integer linear programming. • The unit commitment is integrated with ESSs and wind power penetration.

  5. Development of 3 D Electric Field Analysis Program under Power System Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Myung, S. H.; Lee, K. C.; Lee, J. B.; Ha, T. H. [Korea Electrotechnology Research Institute, Changwon (Korea, Republic of)

    1996-12-01

    Recently, as the effects of electric fields on animals, human beings and sensitive equipment have been reported, the study on electric fields has become more important. Transmission lines and substation among power facilities are dominant parts related to electrical environment. Electric field analysis of transmission line has been made using image charge method or CSM since 1970`s, however electric field analysis in substation has been rarely studied due to the complexity of three dimensional evaluation of an electric field in substation. For the rather complicated and time-consuming three-dimensional electric field calculation in the vicinity of transmission lines and substations, this study proposes an effective numerical calculation method based on Charge Simulation Method(CSM). In order to represent non-uniform charge distribution on an electrode better, it is subdivided into small segments with linear charge density. Each segment with linear charge density can be easily represented by a generalized finite line type of charge whose expressions for potential and electric field were analytically derived and which was named {sup f}inite slant line charge in this study. As for the arrangement of small segments of a subdivided electrode, it has been found that unequally spaced arrangement method is superior to equally spaced one. In order to arrange segments fast and effectively, effective formulas were derived from multiple regression analysis of many simulations. The proposed method is applied to the electric field calculation around the transmission lines with significant change in direction and substation busbars. (author). refs., figs., tabs.

  6. Influence of big power motors for irrigation of electric systems

    International Nuclear Information System (INIS)

    Shimoda, M.; Gialuca, V.; Trombetta, O.R.

    1988-01-01

    The evolution of rural electrification in CPFL - Companhia Paulista de Forca e Luz, Sao Paulo State, Brazil, and the influence of big power motors installation for irrigation in electric system are shown. Considerations about rural market, energy consumption, planning of distribution and transmission line and some calculations are also presented. (author)

  7. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  8. Optimization and Control of Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C. [Univ. of Wisconsin, Madison, WI (United States); Molzahn, Daniel K. [Univ. of Wisconsin, Madison, WI (United States)

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  9. Analysis and evaluation of hybrid scooter transmission systems

    Energy Technology Data Exchange (ETDEWEB)

    Sheu, Kuen-Bao [Department of Vehicle Engineering, National Formosa University, 64 Wunhua Road, Huwei, Yuenlin 63208 (China)

    2007-12-15

    This paper presents a new design concept of transmissions for the hybrid scooters. These transmissions consist of a one-degree-of-freedom planetary gear train and a two-degree-of-freedom planetary gear train to from a split power system and to combine the power of two power sources, a gasoline engine and an electric motor. In order to maximize the performance and reduce emissions, the transmissions can provide a hybrid scooter to run five operating modes: electric motor mode; engine mode; engine/charging mode; power mode, and regenerative braking mode. The main advantages of the transmissions proposed in this paper include the use of only one electric motor/generator, need not use clutch/brake for the shift of the operating modes, and high efficiency. The kinematics, power flow, and mechanical efficiency analyzes are performed; and according to these results, the evaluation of transmission power performances are accomplished. (author)

  10. EFFECTS OF THE PENETRATION OF WIND POWER IN THE BRAZILIAN ELECTRICITY MARKET

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  11. Effects of the penetration of wind power in the brazilian electricity market

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  12. Cryogenic System for a High-Temperature Superconducting Power Transmission Cable

    International Nuclear Information System (INIS)

    Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

    1999-01-01

    High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed

  13. A method for assessing occupational exposure to power-frequency magnetic fields for electricity generation and transmission workers

    International Nuclear Information System (INIS)

    Renew, D C; Cook, R F; Ball, M C

    2003-01-01

    A new method for assessing both current and historical occupational exposures to magnetic fields has been developed and used in health studies involving a cohort of electricity generation and transmission workers in England and Wales. The exposure values are derived by calculation from engineering and operational data about the power stations rather than from measurements. They are provided for each of 11 job categories for each year of operation of each power station represented in the cohort. The engineering data are used to determine the average magnetic fields in specified areas of work within the power station and then applied to information about the time spent in these areas by each of the job categories. The operational data are used to adjust the exposures for each year according to the power station output for the year. Earlier methods used measurements or the advice of panels of experts to provide exposure scores for a number of job categories across all power stations and years. Such methods were not able to distinguish exposures from different power facilities or during the different years of their operation. Measurement surveys at 10 power stations of the magnetic fields in the work areas gave confidence that the calculations were realistic. Exposure measurements on 215 workers at three power stations were compared in job groups with the exposures predicted by the method. The Pearson correlation coefficient was 0.86 and the slope and intercept of the line of best fit were 0.87 and 0.07 μT respectively. The method gives a good prediction of measured exposure and is being used for studies of occupational exposure to magnetic fields and leukaemia, and of cardiovascular disease, and a reanalysis of brain cancer

  14. On energy efficient power allocation for power-constrained systems

    KAUST Repository

    Sboui, Lokman

    2014-09-01

    Recently, the energy efficiency (EE) has become an important factor when designing new wireless communication systems. Due to economic and environmental challenges, new trends and efforts are oriented toward “green” communication especially for energy-constrained applications such as wireless sensors network and cognitive radio. To this end, we analyze the power allocation scheme that maximizes the EE defined as rate over the total power including circuit power. We derive an explicit expression of the optimal power with instantaneous channel gain based on EE criterion. We show that the relation between the EE and the spectral efficiency (SE) when the optimal power is adopted is strictly increasing in contrast with the SE-EE trade-off discussed in the literature. We also solve a non-convex problem and compute explicitly the optimal power for ergodic EE under either a peak or an average power constraint. When the instantaneous channel is not available, we provide the optimal power equation and compute simple sub-optimal power. In the numerical results, we show that the sup-optimal solution is very close to the optimal solution. In addition, we show that the absence of the channel state information (CSI) only affects the EE and the SE performances at high power regime compared to the full CSI case.

  15. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    Science.gov (United States)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  16. Possibilities for Automatic Control of Hydro-Mechanical Transmission and Birotating Electric Machine

    Directory of Open Access Journals (Sweden)

    V. V. Mikhailov

    2014-01-01

    Full Text Available The paper presents mathematical models and results of virtual investigations pertaining to the selected motion parameters of a mobile machine equipped with hydro mechanical and modernized transmissions. The machine has been tested in similar technological cycles and it has been equipped with a universal automatic control system. Changes in structure and type of power transmission have been obtained with the help of a control algorithm including an extra reversible electric machine which is switched in at some operational modes.Implementation of the proposed  concept makes it possible to obtain and check the improved C-code of the control system and enhance operational parameters of the transmission and machine efficiency, reduce slippage and tire wear while using braking energy for its later beneficial use which is usually considered as a consumable element.

  17. Development of a superconducting cable for transmission of high electric power

    International Nuclear Information System (INIS)

    Moisson, F.; Leroux, J.M.

    1971-01-01

    The opportunities opened by the use of cryoresistive and superconducting materials in underground transmission systems have led to a cryocable program. A first set of problems associated with the development of cryogenic cables deals with the cable system, i.e., design, safety, terminal equipment including leads, cryogenic equipment, refrigerators, and problems related to overload capability and reliability. A second set concerns the cable itself, i.e., scientific and technological problems associated with the conductor, the electrical insulation, and the thermal exchange between conductor and helium. Useful experience is gained on the design problems and on the technological problems involved in the construction of a cryoconducting cable. A 20-M aluminum cable cooled down to 25 0 K with pressurized helium flow was built and tested with 3500-A dc under 20 Kv; results are presented. On this model the following types of problems were solved. First, mechanical problems concerning cooling of the cable, thermal contraction of the pipes, electrical insulation and conductors, construction of an invariable cable constituted by elementary helically wound conductors were solved. Second, thermal problems of reduction of heat leaks, conception of thermal insulation, and segmentation of vacuum jackets were solved. Third, electrical problems of design of 300 0 to 25 0 K leads were solved; this problem of losses at both ends is, in proportion, more important for the short model than for long cable. Finally, refrigeration problems of helium and nitrogen flows, thermal shields and design of refrigerators (optimal capacity and spacing) were solved

  18. Optimal Power Constrained Distributed Detection over a Noisy Multiaccess Channel

    Directory of Open Access Journals (Sweden)

    Zhiwen Hu

    2015-01-01

    Full Text Available The problem of optimal power constrained distributed detection over a noisy multiaccess channel (MAC is addressed. Under local power constraints, we define the transformation function for sensor to realize the mapping from local decision to transmitted waveform. The deflection coefficient maximization (DCM is used to optimize the performance of power constrained fusion system. Using optimality conditions, we derive the closed-form solution to the considered problem. Monte Carlo simulations are carried out to evaluate the performance of the proposed new method. Simulation results show that the proposed method could significantly improve the detection performance of the fusion system with low signal-to-noise ratio (SNR. We also show that the proposed new method has a robust detection performance for broad SNR region.

  19. The Economics of Storage, Transmission and Drought: Integrating Variable Wind Power into Spatially Separated Electricity Grids

    NARCIS (Netherlands)

    Scora, H.; Sopinka, A.; Kooten, van G.C.

    2012-01-01

    To mitigate the high variability of wind and make it a more viable renewable energy source, observers recommend greater integration of spatially-separated electrical grids, with high transmission lines linking load centers, scattered wind farms and hydro storage sites. In this study, we examine the

  20. Analysis of competition and market power in the wholesale electricity market in India

    International Nuclear Information System (INIS)

    Shukla, Umesh Kumar; Thampy, Ashok

    2011-01-01

    The electricity reforms were initiated in India with the objective of promoting competition in the electricity market. In order to promote competition, the Electricity Act 2003 was enacted and various policy initiatives were taken by the Government of India. Central Electricity Regulatory Commission (CERC) also facilitated competition through the regulatory framework of availability based tariff, Indian Electricity Grid Code, open access in inter-state transmission, inter-state trading and power exchanges. Despite these initiatives, electricity prices increased in the Wholesale Electricity Market in India (WEMI). This paper analyses the market structure and competitiveness in the WEMI. There are, of course, various potential reasons for the rise in the electricity price. This paper seeks to investigate, if market power was one of the reasons for increase in market prices. Concentration ratio, Herfindahl-Hirschman index, Supply Margin Assessment, and Residual Supply Index have been used to measure market power. This paper also uses the price-cost mark-up to examine, if exercise of market power led to higher margins. The analysis suggests that market power of firms may be part of the reason for the increase in electricity prices in WEMI. The study suggests various measures to increase competition in the WEMI.

  1. Development of a PLC modem for data transmission over a PWM power supply

    Science.gov (United States)

    Batard, Christophe; Ginot, Nicolas; Mannah, Marc Anthony; Millet, Christophe; Poitiers, Frédéric

    2014-04-01

    In variable-speed electrical drive and online conditioning monitoring, a feedback loop is required in order to transmit the sensor information from the motor to the controller close to the inverter. Additional cabling is used for signalling. This extra cabling has a significant cost and data transmission may not be reliable. Thus, the use of power line communication (PLC) technology to transmit data in motor drive application is quite interesting. The use of a PLC modem dedicated to the home network in a three-phase inverter-fed motor power cable does not work. Therefore, specific coupling interfaces are developed to transmit data through a pulse-width modulated power supply. Laboratory tests have shown that the couplers are operating properly. They ensure reliable data transmission in a motor drive application.

  2. Advanced continuously variable transmissions for electric and hybrid vehicles

    Science.gov (United States)

    Loewenthal, S. H.

    1980-01-01

    A brief survey of past and present continuously variable transmissions (CVT) which are potentially suitable for application with electric and hybrid vehicles is presented. Discussion of general transmission requirements and benefits attainable with a CVT for electric vehicle use is given. The arrangement and function of several specific CVT concepts are cited along with their current development status. Lastly, the results of preliminary design studies conducted under a NASA contract for DOE on four CVT concepts for use in advanced electric vehicles are reviewed.

  3. Electric industry governance. Reconciling competitive power markets and the physics of complex transmission interconnections

    Energy Technology Data Exchange (ETDEWEB)

    Stalon, Charles G. [Energy Regulation, Cape Girardeau, MO (United States)

    1997-03-01

    Creating efficient, competitive power markets in an electric industry composed of interconnected control areas requires the existence of some agency with authority to define, impose and enforce rules for the operation of all control areas so interconnected. It has been noted that `the pursuit of self-interest, unrestrained by suitable institutions, carries no guarantee of anything except chaos`. In no part of the economy is this lesson more relevant than in the North American electric industry. As the industry evolves from one dominated by vertically-integrated utilities into one with competitive power markets and unregulated generators, the system of coordinating institutions that has worked acceptably well to restrain and guide self-interested decision makers of economically regulated firms must now be reconstructed to restrain and guide self-interested decision makers of unregulated generating companies (gencos), power merchants and brokers

  4. Water-hydraulic power transmission for offshore wind farms

    NARCIS (Netherlands)

    Diepeveen, N.F.B.; Jarquin Laguna, A.; Kempenaar, A.S.

    2012-01-01

    The current state of the art of offshore wind turbine power transmission technology is expensive, heavy and maintenance intensive. The Delft Offshore Turbine project considers a radically new concept for power transmission in an offshore wind farm: using seawater as power transmission medium. For

  5. DETERMINATION OF TRANSMISSION GEAR RATIO IN MECHANICAL PART OF TRACTOR ELECTRO-MECHANICAL TRANSMISSION

    Directory of Open Access Journals (Sweden)

    Ch. I. Zhdanovich

    2016-01-01

    Full Text Available A methodology has been developed for selection of gear number and transmission gear ratios in mechanical part of a wheel-type tractor with electro-mechanical transmission containing a propulsion asynchronous electric motor with variablefrequency control. The paper proposes to determine a transmission gear ratio on the basis of the following: provision of wheel torque dependence on tractor speed which is the best one for a traction process and during transfer from one gear to the other; provision of nominal operational mode of the electric motor for all tractor operations where it is working for a long period of time; provision of minimum possible number of gears; complete realization of internal combustion engine power on the tractor wheels at limit operational mode of the electric motor. As a characteristic of the asynchronous electric motor with variable-frequency control contains various portions which can be used either completely or partially due to operating conditions, the gear number is determined in the process of transmission gear ration finding but not prior to this. A wheel torque of the tractor with electro-mechanical transmission can be limited according to the following factors: grip of wheel with supporting surface; maximum power of an internal combustion engine which can be transferred to the wheels and a torque which is developed by a propulsion electric motor. It is not proposed to exceed nominal operational mode of the propulsion electric motor for all the operations of the tractor if it is working for a long period of time because in the case of significant excess of the nominal operational mode of the asynchronous electric motor its rather long operation leads to low efficiency and high losses in power, large heat liberation and consequently requires to develop more complicated system for electric motor cooling. An excess of nominal electric motor torque can be justified for short-term operational modes because in this case

  6. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  7. Location matters: The impact of renewable power on transmission congestion and emissions

    International Nuclear Information System (INIS)

    Hitaj, Claudia

    2015-01-01

    Many governments offer subsidies for renewable power to reduce greenhouse gas emissions in the power sector. However, most support schemes for renewable power do not take into account that emissions depend on the location of renewable and conventional power plants within an electricity grid. I simulate optimal power flow in a test grid when 4 renewable power plants connect to the grid across 24 potential sites, amounting to over 10,000 configurations. Each configuration is associated with different levels of emissions and renewable power output. I find that emission reductions vary by a factor of 7 and that curtailment due to transmission congestion is more likely when renewable power plants are concentrated in an area of the grid with low demand. Large cost savings could be obtained by allowing subsidies for renewable power to vary across locations according to abatement potential or by replacing subsidies with a price on emissions. - Highlights: • Analyze the impact of renewable power plant location on congestion and emissions. • Simulate optimal power flow in a test grid for over 10,000 configurations. • Determine that emission reductions vary by a factor of 7. • Find that renewable power is curtailed due to transmission congestion. • Pricing emissions is most efficient since abatement potential varies across locations.

  8. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  9. Economic risks of the capacity expansion of electric power generation: impact of the nuclear energy

    International Nuclear Information System (INIS)

    Nieva G, R.

    2009-01-01

    Uncertainty and risks are inherent to the electric systems planning. The long period of construction that is characteristic of the electric sector works, as well as the long useful life of the generation assets and electric power transmission, they force to plan the expansion of the electric systems along horizons from 10 to 25 years. In periods so long of time it is impossible to predict with certainty the elements of the environment that could influence in the taking of decisions, like they are: the growth and the distribution of the electric power demand, the readiness and fuel prices; the investment costs of the technological options of generation and transmission, as well as the duration of the construction of future projects of new capacity addition. All expansion plan that will be propose, will be exposed to the uncertainty of the environment, gives place to risks or undesirable consequences. The nature of the risks, the strategies to delimit them and the outlines to assign them between the different interested parts and the diverse economic agents, depend in great measure of the legal and normative mark of the sector. In this work these topics are approached inside the reference mark of the Mexican public service of electric power. (Author)

  10. Switched causual modeling of transmission with clutch in hybrid electric vehicles

    OpenAIRE

    LHOMME, W; TRIGUI, R; DELARU, P; JEANNERET, B; BOUSCAUROL, A; BADIN, F

    2008-01-01

    Certain difficulties arise when attempting to model a clutch in a power train transmission due to its nonlinear behavior. Two different states have to be taken into account-the first being when the clutch is locked and the second being when the clutch is slipping. In this paper, a clutch model is developed using the Energetic Macroscopic Representation, which is, in turn, used in the modeling of complete hybrid electric vehicles (HEVs). Two different models are used, and a specific condition ...

  11. Evaluate electric field strengths in the vicinity of electric transmission systems of electric power; Avaliar intensidades de campo eletrico nas vizinhancas de sistemas de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, J.F.; Ulson, J.A.C.; Creppe, R.C.; Serni, P.J.A. [Universidade Estadual Paulista Julio de Mesquita Filho (FEB/UNESP), Bauru, SP (Brazil). Fac. de Engenharia. Dept. de Engenharia Eletrica], Emails: jfranc@feb.unesp.br, ulson@feb.unesp.br, creppe@feb.unesp.br, paulojas@feb.unesp.br

    2009-07-01

    The main purpose in this paper is to describe a methodology for the calculation of the profile of the electric field in the level soil and proximities originated by electric energy transmission systems real and in operation in the country. It is also commented the equation used and your computational implementation in order to agile and to optimize the studies. The results of simulations were just presented for the transmission system in the voltage class 500 kV for to simplify the understanding and space restriction in the article, although five others types of configurations have also been used in the complete study with very voltages and respective classes. The results were animating and very nearby of values well-known of electric field of other and publications traditional in the area. The graphic exits of software for better visual comprehension and understanding went in accomplished in the plan (2D) and in the space (3D). (author)

  12. Proceedings of the CERI 2002 electricity conference : getting a grip on power sector restructuring. CD-ROM ed.

    International Nuclear Information System (INIS)

    2002-01-01

    Electric power restructuring in a global context was reviewed at this conference which examined how existing market structures can be improved to benefit all participants. Topics of discussion ranged from issues regarding future development of power generation and transmission, to developing trends, expectations and implications for consumers, power generators and energy service providers. The 7 sessions of the conference were entitled: (1) global lessons from restructuring, what works and what doesn't, (2) competition in electricity markets, (3) restructuring in Canada, (4) suggestions for power sector reform, (5) competition in future generation markets, (6) trading, financing and generation alternatives, and (7) transmission expansion. A total of 7 papers have been indexed separately for inclusion in the database. refs., tabs., figs

  13. Heuristic procedures for transmission planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Lu, Wene; Bompard, Ettore; Napoli, Roberto; Jiang, Xiuchen

    2007-01-01

    The network structure of the power system, in an electricity market under the pool model, may have severe impacts on market performance, reducing market efficiency considerably, especially when producers bid strategically. In this context network re-enforcement plays a major role and proper strategies of transmission planning need to be devised. This paper presents, for pool-model electricity markets, two heuristic procedures to select the most effective subset of lines that would reduce the impacts on the market, from a set of predefined candidate lines and within the allowed budget for network expansion. A set of indices that account for the economic impacts of the re-enforcing of the candidate lines, both in terms of construction cost and market efficiency, are proposed and used as sensitivity indices in the heuristic procedure. The proposed methods are applied and compared with reference to an 18-bus test system. (author)

  14. Microwave transmission system for space power

    Energy Technology Data Exchange (ETDEWEB)

    Dickinson, R M [Jet Propulsion Lab., Pasadena, Calif. (USA)

    1976-09-01

    A small total system model and a large subsystem element similar to those that could be eventually used for wireless power transmission experiments in space have been successfully demonstrated by NASA. The short range, relatively low-power laboratory system achieved a dc-to-dc transmission efficiency of 54%. A separate high-power-level receiving subsystem, tested over a 1.54-km range at Goldstone, California, has achieved the transportation of over 30 kW of dc output power. Both tests used 12-cm wave-length microwaves.

  15. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Ichikawa, Takemi; Ueda, Kiyotaka; Machida, Takehiko

    1979-01-01

    The HVDC transmission directly from nuclear power plants is one of the patterns of long distance and large capacity HVDC transmission systems. In this report, the double pole, two-circuit HVDC transmission from a BWR nuclear power plant is considered, and the dynamic response characteristics due to the faults in dc line and ac line of inverter side are analyzed, to clarify the dynamic characteristics of the BWR nuclear power plant and dc system due to system faults and the effects of dc power control to prevent reactor scram. (1) In the instantaneous earthing fault of one dc line, the reactor is not scrammed by start-up within 0.8 sec. (2) When the earthing fault continues, power transmission drops to 75% by suspending the faulty pole, and the reactor is scrammed. (3) In the instantaneous ground fault of 2 dc lines, the reactor is not scrammed if the faulty dc lines are started up within 0.4 sec. (4) In the existing control of dc lines, the reactor is scrammed when the ac voltage at an ac-dc connection point largely drops due to ac failure. (J.P.N.)

  16. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  17. Power losses in electrical networks depending on weather conditions

    International Nuclear Information System (INIS)

    Zhelezko, Yu. S.; Kostyushko, V. A.; Krylov, S. V.; Nikiforov, E. P.; Savchenko, O. V.; Timashova, L. V.; Solomonik, E. A.

    2005-01-01

    Specific power losses to corona and to leakage currents over overhead insulators are presented for 110 - 750-kV transmission lines with different phase design and pole types for different weather conditions. Consumption of electric energy for ice melting on conductors of various cross sections is evaluated. Meteorological data of 1372 weather stations in Russia are processed for a period of 10 years. The territory of the country is divided into 7 regions with approximately homogeneous weather conditions. Specific power losses to corona and leakage currents over overhead insulators are presented for every region

  18. Security constrained optimal power flow by modern optimization tools

    African Journals Online (AJOL)

    Security constrained optimal power flow by modern optimization tools. ... International Journal of Engineering, Science and Technology ... If you would like more information about how to print, save, and work with PDFs, Highwire Press ...

  19. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  20. Electric power annual, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    The Electric Power Annual presents a summary of electric utility statistics at the national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts and the general public with historical data that may be used in understanding US electricity markets. ''The Industry at a Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter

  1. Electrical engineering unit for the reactive power control of the load bus at the voltage instability

    Science.gov (United States)

    Kotenev, A. V.; Kotenev, V. I.; Kochetkov, V. V.; Elkin, D. A.

    2018-01-01

    For the purpose of reactive power control error reduction and decrease of the voltage sags in the electric power system caused by the asynchronous motors started the mathematical model of the load bus was developed. The model was built up of the sub-models of the following elements: a transformer, a transmission line, a synchronous and an asynchronous loads and a capacitor bank load, and represents the automatic reactive power control system taking into account electromagnetic processes of the asynchronous motors started and reactive power changing of the electric power system elements caused by the voltage fluctuation. The active power/time and reactive power/time characteristics based on the recommended procedure of the equivalent electric circuit parameters calculation were obtained. The derived automatic reactive power control system was shown to eliminate the voltage sags in the electric power system caused by the asynchronous motors started.

  2. Liberation of electric power and nuclear power generation

    International Nuclear Information System (INIS)

    Yajima, Masayuki

    2000-01-01

    In Japan, as the Rule on Electric Business was revised after an interval of 35 years in 1995, and a competitive bid on new electric source was adopted after 1996 fiscal year, investigation on further competition introduction to electric power market was begun by establishment of the Basic Group of the Electric Business Council in 1997. By a report proposed on January, 1999 by the Group, the Rule was revised again on March, 1999 to start a partial liberation or retail of the electric power from March, 2000. From a viewpoint of energy security and for solution of global environmental problem in Japan it has been decided to positively promote nuclear power in future. Therefore, it is necessary to investigate how the competition introduction affects to development of nuclear power generation and what is a market liberation model capable of harmonizing with the development on liberation of electric power market. Here was elucidated on effect of the introduction on previous and future nuclear power generation, after introducing new aspects of nuclear power problems and investigating characteristic points and investment risks specific to the nuclear power generation. And, by investigating some possibilities to development of nuclear power generation under liberation models of each market, an implication was shown on how to be future liberation on electric power market in Japan. (G.K.)

  3. Impact of plug-in hybrid electric vehicles on power systems with demand response and wind power

    International Nuclear Information System (INIS)

    Wang Jianhui; Liu Cong; Ton, Dan; Zhou Yan; Kim, Jinho; Vyas, Anantray

    2011-01-01

    This paper uses a new unit commitment model which can simulate the interactions among plug-in hybrid electric vehicles (PHEVs), wind power, and demand response (DR). Four PHEV charging scenarios are simulated for the Illinois power system: (1) unconstrained charging, (2) 3-hour delayed constrained charging, (3) smart charging, and (4) smart charging with DR. The PHEV charging is assumed to be optimally controlled by the system operator in the latter two scenarios, along with load shifting and shaving enabled by DR programs. The simulation results show that optimally dispatching the PHEV charging load can significantly reduce the total operating cost of the system. With DR programs in place, the operating cost can be further reduced. - Research highlights: → A unit commitment model is used to simulate the interactions among plug-in hybrid electric vehicles (PHEVs), wind power, and demand response (DR). → Different PHEV charging scenarios are simulated on the Illinois power system → Load shifting and shaving enabled by DR programs are also modeled. → The simulation results show that the operating cost can be reduced with DR and optimal PHEV charging.

  4. Islanding the power grid on the transmission level: less connections for more security

    Science.gov (United States)

    Mureddu, Mario; Caldarelli, Guido; Damiano, Alfonso; Scala, Antonio; Meyer-Ortmanns, Hildegard

    2016-10-01

    Islanding is known as a management procedure of the power system that is implemented at the distribution level to preserve sensible loads from outages and to guarantee the continuity in electricity supply, when a high amount of distributed generation occurs. In this paper we study islanding on the level of the transmission grid and shall show that it is a suitable measure to enhance energy security and grid resilience. We consider the German and Italian transmission grids. We remove links either randomly to mimic random failure events, or according to a topological characteristic, their so-called betweenness centrality, to mimic an intentional attack and test whether the resulting fragments are self-sustainable. We test this option via the tool of optimized DC power flow equations. When transmission lines are removed according to their betweenness centrality, the resulting islands have a higher chance of being dynamically self-sustainable than for a random removal. Less connections may even increase the grid’s stability. These facts should be taken into account in the design of future power grids.

  5. Improved SCR ac Motor Controller for Battery Powered Urban Electric Vehicles

    Science.gov (United States)

    Latos, T. S.

    1982-01-01

    An improved ac motor controller, which when coupled to a standard ac induction motor and a dc propulsion battery would provide a complete electric vehicle power train with the exception of the mechanical transmission and drive wheels was designed. In such a system, the motor controller converts the dc electrical power available at the battery terminals to ac electrical power for the induction motor in response to the drivers commands. The performance requirements of a hypothetical electric vehicle with an upper weight bound of 1590 kg (3500 lb) were used to determine the power rating of the controller. Vehicle acceleration capability, top speed, and gradeability requisites were contained in the Society of Automotive Engineers (SAE) Schedule 227a(d) driving cycle. The important capabilities contained in this driving cycle are a vehicle acceleration requirement of 0 to 72.4 kmph (0 to 45 mph) in 28 seconds a top speed of 88.5 kmph (55 mph), and the ability to negotiate a 10% grade at 48 kmph (30 mph). A 10% grade is defined as one foot of vertical rise per 10 feet of horizontal distance.

  6. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  7. Driving with electrical power

    International Nuclear Information System (INIS)

    Ursin, M.; Hoeckel, M.

    2008-01-01

    This article takes a look at the chances offered to the electricity supply industry by the increasing use of battery-driven vehicles - and the advantages thus offered to the environment. The use of the vehicles' batteries to form a distributed electricity storage scheme is discussed. The authors comment that, although electrically-driven vehicles consume more power, the total primary energy consumption and pollutant emissions will be reduced. The actual electricity consumption of electric vehicles and the source of this power are examined. Power saved by the reduced use of electrical heating systems and boilers could, according to the authors, be used to charge the batteries of electric vehicles. The use of these batteries as a storage system to help regulate electricity supplies is discussed and the steps to be taken for the implementation of such a system are listed

  8. Electric power transport costs - methodologies analysis; Custos de transporte de energia eletrica: analise de metodologias

    Energy Technology Data Exchange (ETDEWEB)

    Takahata, Dario

    1997-07-01

    The dissertation presents the aspects related to the restructuring of power systems in terms of international experiences, and the possible implications for the definition of the new power system in Brazil. The experience shows that the reform in various countries has started from the sector deverticalization, together with the transmissions open access scheme. The retrospect of researched countries indicates that the transmissions remuneration is based on a methodology that recovers the operative cost of transmission transactions, along with an additional amount that take into account the cost of the existing transmission system. The following countries have been analyzed: Chile, Norway, England and Argentina. This work also shows the current situation in Brazil, as in terms of tariffs, as regarding the power system organizational structure, as well as a preliminary proposal conceived by SINTREL (National System of Electrical Energy Transmission) to evaluate the transmission transaction cost. This dissertation ended with comments and conclusions, depicting a future program which might be followed, considering the aspects quoted above and the peculiarities of brazilian power system. (author)

  9. Transmission congestion management in the electricity market

    Science.gov (United States)

    Chen, Yue

    2018-04-01

    In this paper we mainly discuss how to optimize the arrangement to decrease the loss of each line when the power generation side of the system transmission congestion occurs in a safe and economical manner. We respectively set the adjust model if the transmission can be eliminated which can calculate the best scheme and safety margin model when transmission cannot be eliminated which is a multi-objective planning problem. We solve the two models on the condition of the load power demands are 982.4MW and 1052.8 MW by Lingo and get the optimal management scheme.

  10. New technologies application to increase the transmission capacity in power systems; Aplicacao de novas tecnologias para aumentar a capacidade de transmissao em sistemas de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Erli Ferreira [Universidade do Estado, Rio de Janeiro, RJ (Brazil)]. E-mail: erli@openlink.com.br

    2001-07-01

    The deregulation and the Brazilian electric sector new formulation associated to the growth of the electric energy market, has been contributing to increase the power flows through located transmission lines in one same region, as well as in different regions. This increase of flow will require the construction of new transmission lines, in general associated to eventual efforts in the system. However, due to environmental restrictions and to difficulties for acquisition of free soil bands for transmission lines, in this article new technologies of transmission in order to increase the capacity of the existing and future power systems are presented, with the purpose of preventing or postponing the construction of new transmission lines.

  11. Overview on the electric power in june 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during june 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in June 2003 has risen by 1.8% compared with that of June 2002. The June average temperature which has been 2.9 deg. C higher in 2003 than in June 2002 has resulted in consumption linked to higher use of air-conditioning. Adjusted for climatic effects, monthly consumption has increased by 1.3% compared with June 2002. The consumption growth rate adjusted over 12 months has fallen by 0.1% since last month, whereas the national consumption growth rate over the last 12 months has remained stable; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in June 2003, consumption has increased compared with June 2002, whereas exports have fallen by 0.3 TWh. The overall volume of injections has risen by 0.2 TWh. This month, hydro generation is down by 0.8 TWh due to inflows being 25% lower than in June 2002, whereas thermal generation is up by 0.3 TWh. Imports are up by around 0.7 TWh; the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for access to international connections, contractual exchanges by border; and the evolution of the transmission network - the following

  12. Electrodynamic wireless power transmission to a torsional receiver

    International Nuclear Information System (INIS)

    McEachern, K M; Arnold, D P

    2013-01-01

    This paper presents a wireless power transmission (WPT) concept that uses electrodynamic coupling and torsional motion of a permanent magnet in the receiver. The system is shown to transfer an average power of 3.09 mW (power density equal to 143 μW/cm 3 ) over a distance of 1 cm, an average power of 1.98 mW over a distance of 2 cm, and an average power of 126 μW over a distance of 7 cm. We also demonstrate unaltered power transmission through conductive media, including a human hand and an aluminum plate, highlighting a key advantage of the electrodynamic wireless power transmission approach

  13. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  14. Network Constrained Transactive Control for Electric Vehicles Integration

    DEFF Research Database (Denmark)

    Hu, Junjie; Yang, Guangya; Bindner, Henrik W.

    2015-01-01

    . This paper applies the transactive control concept to integrate electric vehicles into the power distribution system with the purpose of minimizing the charging cost of electric vehicles as well as preventing grid congestions and voltage violations. A hierarchical EV management system is proposed where three...

  15. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  16. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  17. Security-constrained self-scheduling of generation companies in day-ahead electricity markets considering financial risk

    International Nuclear Information System (INIS)

    Amjady, Nima; Vahidinasab, Vahid

    2013-01-01

    Highlights: ► A security-constrained self-scheduling is presented. ► The proposed framework takes into account the uncertainty of the predicted market prices. ► We model the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. ► Unit commitment and inter-temporal constraints of generators are considered in an MIP model. ► Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems. - Abstract: In this paper, a new security-constrained self-scheduling framework incorporating the transmission flow limits in both steady state conditions and post-contingent states is presented to produce efficient bidding strategy for generation companies (GENCOs) in day-ahead electricity markets. Moreover, the proposed framework takes into account the uncertainty of the predicted market prices and models the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. Furthermore, unit commitment and inter-temporal constraints of generators are considered in the suggested model converting it to a mixed-integer programming (MIP) optimization problem. Sensitivity of the proposed framework with respect to both the level of the market prices and adopted risk level is also evaluated in the paper. Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems illustrating the performance of the proposed self-scheduling model.

  18. Competition and power pooling in the electricity industry

    International Nuclear Information System (INIS)

    Jasinski, P.; Yarrow, G.; Fusaro, P.

    1995-01-01

    Two contributions to the debate on power pooling and competition in the electricity supply industry are presented. In the first, the situation in England and Wales where power pooling was introduced shortly before privatization is analysed. Pooling has existed for many years in the USA but as an inter-generator arrangement designed to optimize production and costs. The British system sought in addition to establish a spot market in which bulk buyers as well as bulk suppliers could participate. There are however obvious weaknesses in the pool as a competitive market and it is argued that a combination of pooling arrangements and longer-term bilateral supply contracts are more likely to offer the prospect of workably competitive and efficient outcomes. The second contribution discusses how competitive markets will evolve in the USA under the new regime of less onerous regulation heralded by the Energy Policy Act if 1992 and the emergence of electricity trading markets which followed. In particular, the proposal by the California Public Utility commission favouring a mandatory Poolco is examined. Poolco would operate the transmission grid and dispatch generating plants while the utilities would retain ownership of transmission facilities and be required to supply the pool. This is seen as representing only partial deregulation and not to be consistent with moves to further competition and encourage free markets. (U.K.)

  19. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  20. Structure-property relationships in an Al matrix Ca nanofilamentary composite conductor with potential application in high-voltage power transmission

    Science.gov (United States)

    Tian, Liang

    This study investigated the processing-structure-properties relationships in an Al/Ca composites using both experiments and modeling/simulation. A particular focus of the project was understanding how the strength and electrical conductivity of the composite are related to its microstructure in the hope that a conducting material with light weight, high strength, and high electrical conductivity can be developed to produce overhead high-voltage power transmission cables. The current power transmission cables (e.g., Aluminum Conductor Steel Reinforced (ACSR)) have acceptable performance for high-voltage AC transmission, but are less well suited for high-voltage DC transmission due to the poorly conducting core materials that support the cable weight. This Al/Ca composite was produced by powder metallurgy and severe plastic deformation by extrusion and swaging. The fine Ca metal powders have been produced by centrifugal atomization with rotating liquid oil quench bath, and a detailed study about the atomization process and powder characteristics has been conducted. The microstructure of Al/Ca composite was characterized by electron microscopy. Microstructure changes at elevated temperature were characterized by thermal analysis and indirect resistivity tests. The strength and electrical conductivity were measured by tensile tests and four-point probe resistivity tests. Predicting the strength and electrical conductivity of the composite was done by micro-mechanics-based analytical modeling. Microstructure evolution was studied by mesoscale-thermodynamics-based phase field modeling and a preliminary atomistic molecular dynamics simulation. The application prospects of this composite was studied by an economic analysis. This study suggests that the Al/Ca (20 vol. %) composite shows promise for use as overhead power transmission cables. Further studies are needed to measure the corrosion resistance, fatigue properties and energized field performance of this composite.

  1. Transmission prices in the electric system. Technical constraints and economic efficiency

    International Nuclear Information System (INIS)

    Polidori, P.

    1999-01-01

    This article analyses the two main models at the core of today's theoretical discussion on transmission pricing in electricity sectors under competition. The first aim of the paper is showing how technical constraints that characterise transmission systems may affect energy production and transmission and therefore the definition of the price system for using the electric grid. The second aim of the paper is showing how it is possible to suggest solutions, although not free from limitations, that can be used for an efficient management of electric systems characterised by generation and consumption sectors under competition [it

  2. Feasibility study for linking railway network and power transmission infrastructure; Machbarkeitsstudie zur Verknuepfung von Bahn- und Energieleitungsinfrastrukturen

    Energy Technology Data Exchange (ETDEWEB)

    Hofmann, Lutz; Rathke, Christian [Hannover Univ. (Germany). Inst. fuer Energieversorgung und Hochspannungstechnik; Stephan, Arnd; Albrecht, Andreas [Technische Univ. Dresden (Germany). Inst. fuer Bahnfahrzeuge und Bahntechnik; Weyer, Hartmut; Lismann, Christian (comps.) [Technische Univ. Clausthal, Clausthal-Zellerfeld (Germany). Inst. fuer Deutsches und Internationales Berg- und Energierecht

    2013-03-15

    At times of growing emergencies of electricity transport, the extension of transmission becomes a necessary and compulsory component of the energy concept of the Federal Government. The extension of the capacities of the network transportation from North to South and from east to West is inevitable. Under this aspect, the contribution under consideration analyzes whether and to what extent the utilization of the existing railways potentials of the 16.7 Hz traction power supply system of the DB Energie GmbH (Frankfurt (Main), Federal Republic of Germany) is possible for the establishment of new power transmission lines of the general 50 Hz power supply. Furthermore, it is investigated to what extent possibilities of infrastructure connections exist in the shape of combined transmission routes between traction supply and public energy supply.

  3. Application of the load flow and random flow models for the analysis of power transmission networks

    International Nuclear Information System (INIS)

    Zio, Enrico; Piccinelli, Roberta; Delfanti, Maurizio; Olivieri, Valeria; Pozzi, Mauro

    2012-01-01

    In this paper, the classical load flow model and the random flow model are considered for analyzing the performance of power transmission networks. The analysis concerns both the system performance and the importance of the different system elements; this latter is computed by power flow and random walk betweenness centrality measures. A network system from the literature is analyzed, representing a simple electrical power transmission network. The results obtained highlight the differences between the LF “global approach” to flow dispatch and the RF local approach of randomized node-to-node load transfer. Furthermore, computationally the LF model is less consuming than the RF model but problems of convergence may arise in the LF calculation.

  4. Dynamic state estimation techniques for large-scale electric power systems

    International Nuclear Information System (INIS)

    Rousseaux, P.; Pavella, M.

    1991-01-01

    This paper presents the use of dynamic type state estimators for energy management in electric power systems. Various dynamic type estimators have been developed, but have never been implemented. This is primarily because of dimensionality problems posed by the conjunction of an extended Kalman filter with a large scale power system. This paper precisely focuses on how to circumvent the high dimensionality, especially prohibitive in the filtering step, by using a decomposition-aggregation hierarchical scheme; to appropriately model the power system dynamics, the authors introduce new state variables in the prediction step and rely on a load forecasting method. The combination of these two techniques succeeds in solving the overall dynamic state estimation problem not only in a tractable and realistic way, but also in compliance with real-time computational requirements. Further improvements are also suggested, bound to the specifics of the high voltage electric transmission systems

  5. An electrical betweenness approach for vulnerability assessment of power grids considering the capacity of generators and load

    Science.gov (United States)

    Wang, Kai; Zhang, Bu-han; Zhang, Zhe; Yin, Xiang-gen; Wang, Bo

    2011-11-01

    Most existing research on the vulnerability of power grids based on complex networks ignores the electrical characteristics and the capacity of generators and load. In this paper, the electrical betweenness is defined by considering the maximal demand of load and the capacity of generators in power grids. The loss of load, which reflects the ability of power grids to provide sufficient power to customers, is introduced to measure the vulnerability together with the size of the largest cluster. The simulation results of the IEEE-118 bus system and the Central China Power Grid show that the cumulative distributions of node electrical betweenness follow a power-law and that the nodes with high electrical betweenness play critical roles in both topological structure and power transmission of power grids. The results prove that the model proposed in this paper is effective for analyzing the vulnerability of power grids.

  6. Location of Faults in Power Transmission Lines Using the ARIMA Method

    Directory of Open Access Journals (Sweden)

    Danilo Pinto Moreira de Souza

    2017-10-01

    Full Text Available One of the major problems in transmission lines is the occurrence of failures that affect the quality of the electric power supplied, as the exact localization of the fault must be known for correction. In order to streamline the work of maintenance teams and standardize services, this paper proposes a method of locating faults in power transmission lines by analyzing the voltage oscillographic signals extracted at the line monitoring terminals. The developed method relates time series models obtained specifically for each failure pattern. The parameters of the autoregressive integrated moving average (ARIMA model are estimated in order to adjust the voltage curves and calculate the distance from the initial fault localization to the terminals. Simulations of the failures are performed through the ATPDraw ® (5.5 software and the analyses were completed using the RStudio ® (1.0.143 software. The results obtained with respect to the failures, which did not involve earth return, were satisfactory when compared with widely used techniques in the literature, particularly when the fault distance became larger in relation to the beginning of the transmission line.

  7. Wireless power transmission for battery charging

    Science.gov (United States)

    Mi, Chris; Li, Siqi; Nguyen, Trong-Duy; Wang, Junhua; Li, Jiangui; Li, Weihan; Xu, Jun

    2016-11-15

    A wireless power transmission system is provided for high power applications. The power transmission system is comprised generally of a charging unit configured to generate an alternating electromagnetic field and a receive unit configured to receive the alternating electromagnetic field from the charging unit. The charging unit includes a power source; an input rectifier; an inverter; and a transmit coil. The transmit coil has a spirangle arrangement segmented into n coil segments with capacitors interconnecting adjacent coil segments. The receive unit includes a receive coil and an output rectifier. The receive coil also has a spirangle arrangement segmented into m coil segments with capacitors interconnecting adjacent coil segments.

  8. Transmission market support system

    International Nuclear Information System (INIS)

    Reinschmidt, K.F.; Coles, B.C.

    1995-01-01

    An interactive, computer-based market support system has been developed for transmission access that is efficient, equitable, and fair to all parties concerned with electrical transmission: utilities, electric generators, owners of transmission networks, and wholesale purchasers of electrical power. Each participant transmits electronically to the computer system his proposed price schedule for buying, selling, or transmitting power for each future time period. The price for transmission on a single line in one direction can differ from the price in the other direction. The total quantity offered in the transmission bid represents the capacity of the line, and the flow on the line cannot exceed this value. The system automatically computes the prices that clear the market; that is, the price that each generator receives at each bus, the price that each transmission operator receives on each line, and the price that each customer pays at each bus. The computer system maximizes the benefits to all three classes while satisfying the electrical characteristics of the transmission system by means of load flow calculations. Customers never pay more than their bid prices (but may pay less), and generators and transmission operators never receive less than their bid prices (but may receive more). The price at each bus applies to all buyers and sellers at that bus: all buyers at the same bus pay the same price and all generators at a bus receive the same price

  9. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  10. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  11. Electric power in Canada 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs.

  12. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs

  13. Electricity transmission pricing and technology

    International Nuclear Information System (INIS)

    Einhorn, M.; Siddiqi, R.

    1996-01-01

    The electric utility industry and its stake holders in the United States appear to be at a critical juncture in time. Powerful forces of global proportions are propelling the industry instinctively and in a secular fashion towards restructuring. That the industry will change is a fait accomplii. The nature and timing of the change is still a matter of intense debate, however. Because of the evolution of the industry into its present-day form, i.e. regulated local monopolies in their designated franchise service territories, the relative roles and expectations of various institutions would have to change to conform to the new state in the future. In either encouraging, or allowing this change to happen, society is essentially saying that future societal welfare would be better served by the changed structure contemplated. What that assumption translates into in more direct terms is that creation of future wealth would be better accomplished through redistribution of wealth today. Thoughtful individuals recognize the enormous responsibility placed upon the various entities empowered with jurisdiction over the timing and nature of the structural change. They are trying hard to bring analytical rigor to bear on the debate. One very critical element of this debate on restructuring is the issue of the treatment of transmission. The issue has been variously labeled transmission access, or pricing. Volumes have been written and spoken on this topic. We felt that there was a pressing need to assemble a volume which would serve as a one-stop source for varied viewpoints and comprehensive coverage of the subject, both technical and economic. 58 figs., 23 tabs., 103 refs

  14. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  15. Electric Utility Transmission and Distribution Line Engineering Program

    Energy Technology Data Exchange (ETDEWEB)

    Peter McKenny

    2010-08-31

    Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular

  16. Electricity tariff design for transition economies. Application to the Libyan power system

    Energy Technology Data Exchange (ETDEWEB)

    Reneses, Javier; Gomez, Tomas; Rivier, Juan [Universidad Pontificia Comillas, Madrid (Spain); Angarita, Jorge L. [Europraxis Operations, Madrid (Spain)

    2011-01-15

    This paper presents a general electricity tariff design methodology, especially applicable for transition economies. These countries are trying to modernize their power systems from a centralized environment (with normally, a public vertically integrated electric company) to a liberalized framework (unbundling electricity companies and, eventually, starting a privatization process). Two issues arise as crucial to achieving a successful transition: (1) ensuring cost recovery for all future unbundled activities (generation, transmission, distribution and retailing), and (2) sending the right price signals to electricity customers, avoiding cross-subsidies between customer categories. The design of electricity tariffs plays a pivotal role in achieving both objectives. This paper proposes a new tariff design methodology that, complying with these two aforementioned criteria, requires a low amount of information regarding system data and customer load profiles. This is important since, typically, volume and quality of data are poor in those countries. The presented methodology is applied to computing tariffs for the Libyan power system in 2006, using real data. (author)

  17. HVDC transmission power conversion applications in power systems

    CERN Document Server

    Kim, Chan-Ki; Jang, Gil-Soo; Lim, Seong-Joo; Lee, Seok-Jin

    2009-01-01

    HVDC is a critical solution to several major problems encountered when trying to maintain systemic links and quality in large-scale renewable energy environments. HDVC can resolve a number of issues, including voltage stability of AC power networks, reducing fault current, and optimal management of electric power, ensuring the technology will play an increasingly important role in the electric power industry. To address the pressing need for an up-to-date and comprehensive treatment of the subject, Kim, Sood, Jang, Lim and Lee have collaborated to produce this key text and reference.  Combin

  18. Fundamental study of bulk power HVDC transmission

    International Nuclear Information System (INIS)

    1981-01-01

    Study on the HVDC power transmission have been conducted since 1956. Shinshinano-Frequency Changer had been operated at first on 1977, as our home product, and Hokkaido-Honshu DC transmission also realized at 1979. Research and Development of the bulk power HVDC have been promoted by the UHV transmission special committee in our Institute from 1980. This paper is a comprehensive report published in the parts of operating control, insulation of DC line and countermeasure of fault current, and interferences in order to contribute for planning, design and operating of the UHV DC transmission in future. (author)

  19. Wireless power transmission for biomedical implants: The role of near-zero threshold CMOS rectifiers.

    Science.gov (United States)

    Mohammadi, Ali; Redoute, Jean-Michel; Yuce, Mehmet R

    2015-01-01

    Biomedical implants require an electronic power conditioning circuitry to provide a stable electrical power supply. The efficiency of wireless power transmission is strongly dependent on the power conditioning circuitry specifically the rectifier. A cross-connected CMOS bridge rectifier is implemented to demonstrate the impact of thresholds of rectifiers on wireless power transfer. The performance of the proposed rectifier is experimentally compared with a conventional Schottky diode full wave rectifier over 9 cm distance of air and tissue medium between the transmitter and receiver. The output voltage generated by the CMOS rectifier across a 1 KΩ resistive load is around twice as much as the Schottky rectifier.

  20. 30 CFR 77.500 - Electric power circuits and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuits and electric equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.500 Electric power circuits and electric equipment; deenergization. Power circuits and electric equipment shall be deenergized before work is done on...

  1. STUDY ON PERFORMANCE OF 21M 132kV TRANSMISSION TOWER WITH MEDIUM WIND INTENSITY

    OpenAIRE

    V. LAKSHMI; A. RAJAGOPALA RAO

    2012-01-01

    Electric Power is today playing an increasingly important role in the life of the community. In the electric power system the production and transmission of power are two predominant factors. For the purpose of transmission of electricity towers are the main medium with some wires at required distances and altitudes. The remotehydroelectric power plants have given rise to the need for extra high voltage. Prior to 1950, 150 kV electric transmission lines were considered and still higher voltag...

  2. Integrated Multimedia Based Intelligent Group Decision Support System for Electrical Power Network

    Directory of Open Access Journals (Sweden)

    Ajay Kumar Saxena

    2002-05-01

    Full Text Available Electrical Power Network in recent time requires an intelligent, virtual environment based decision process for the coordination of all its individual elements and the interrelated tasks. Its ultimate goal is to achieve maximum productivity and efficiency through the efficient and effective application of generation, transmission, distribution, pricing and regulatory systems. However, the complexity of electrical power network and the presence of conflicting multiple goals and objectives postulated by various groups emphasized the need of an intelligent group decision support system approach in this field. In this paper, an Integrated Multimedia based Intelligent Group Decision Support System (IM1GDSS is presented, and its main components are analyzed and discussed. In particular attention is focused on the Data Base, Model Base, Central Black Board (CBB and Multicriteria Futuristic Decision Process (MFDP module. The model base interacts with Electrical Power Network Load Forecasting and Planning (EPNLFP Module; Resource Optimization, Modeling and Simulation (ROMAS Module; Electrical Power Network Control and Evaluation Process (EPNCAEP Module, and MFDP Module through CBB for strategic planning, management control, operational planning and transaction processing. The richness of multimedia channels adds a totally new dimension in a group decision making for Electrical Power Network. The proposed IMIGDSS is a user friendly, highly interactive group decision making system, based on efficient intelligent and multimedia communication support for group discussions, retrieval of content and multi criteria decision analysis.

  3. EHV/HV Underground Cable Systems for Power Transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    of the transmission system must be re‐thought in order to accommodate the transmission needs for the future. New lines have to be constructed. Transmission lines are usually laid out as overhead lines, which are large structures, i.e. a 400 kV power pylon is 50 meters high. According to public opinion, such power...

  4. Impact of steep-front short-duration impulse on electric power system insulation

    Energy Technology Data Exchange (ETDEWEB)

    Burrage, L M; Veverka, E F; Shaw, J H [Cooper Industries, Inc., Franksville, WI (USA). Cooper Power Systems; McConnell, B W [Oak Ridge National Lab., TN (USA)

    1991-04-01

    This research effort required the performance evaluation of three specific insulation systems in common usage by electric power transmission and distribution utilities under stresses imposed by: three characteristic impulse waveforms (two waves representative of steep-front short duration (SFSD) impulses and one representative of lightning), the cumulative effect of multiple shots'' of each pulse, 60 Hz voltage, and, where appropriate, and mechanical load. The insulation systems evaluated are the cellulose-paper/oil combination typical of power transformer and condenser bushing usage, the cellulose-paper/enamel/oil combination used in distribution transformer construction, and the porcelain/air combination representing transmission and distribution line structural insulation. 4 refs., 94 figs., 11 tabs.

  5. Electric trade in the United States 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This publication, Electric Trade in the US 1992 (ELECTRA), is the fourth in a series of reports on wholesale power transactions prepared by the Electric Data Systems Branch, Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA). The electric trade data are published biennially. The first report presented 1986 data, and this report provides information on the electric power industry during 1992. The electric trade data collected and presented in this report furnish important information on the wholesale structure found within the US electric power industry. The patterns of interutility trade in the report support analyses of wholesale power transactions and provide input for a broader understanding of bulk power market issues that define the emerging national electric energy policies. The report includes information on the quantity of power purchased, sold, exchanged, and wheeled; the geographical locations of transactions and ownership classes involved; and the revenues and costs. Information on the physical transmission system are being included for the first time in this publication. Transmission data covering investor-owned electric utilities were shifted from the Financial Statistics of Selected Investor-Owned Electric Utilities to the ELECTRA publication. Some of the prominent features of this year`s report include information and data not published before on transmission lines for publicly owned utilities and transmission lines added during 1992 by investor-owned electric utilities.

  6. Electric trade in the United States 1992

    International Nuclear Information System (INIS)

    1994-09-01

    This publication, Electric Trade in the US 1992 (ELECTRA), is the fourth in a series of reports on wholesale power transactions prepared by the Electric Data Systems Branch, Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA). The electric trade data are published biennially. The first report presented 1986 data, and this report provides information on the electric power industry during 1992. The electric trade data collected and presented in this report furnish important information on the wholesale structure found within the US electric power industry. The patterns of interutility trade in the report support analyses of wholesale power transactions and provide input for a broader understanding of bulk power market issues that define the emerging national electric energy policies. The report includes information on the quantity of power purchased, sold, exchanged, and wheeled; the geographical locations of transactions and ownership classes involved; and the revenues and costs. Information on the physical transmission system are being included for the first time in this publication. Transmission data covering investor-owned electric utilities were shifted from the Financial Statistics of Selected Investor-Owned Electric Utilities to the ELECTRA publication. Some of the prominent features of this year's report include information and data not published before on transmission lines for publicly owned utilities and transmission lines added during 1992 by investor-owned electric utilities

  7. Predicting transmission of structure-borne sound power from machines by including terminal cross-coupling

    DEFF Research Database (Denmark)

    Ohlrich, Mogens

    2011-01-01

    of translational terminals in a global plane. This paired or bi-coupled power transmission represents the simplest case of cross-coupling. The procedure and quality of the predicted transmission using this improved technique is demonstrated experimentally for an electrical motor unit with an integrated radial fan......Structure-borne sound generated by audible vibration of machines in vehicles, equipment and house-hold appliances is often a major cause of noise. Such vibration of complex machines is mostly determined and quantified by measurements. It has been found that characterization of the vibratory source...

  8. A comprehensive approach for computation and implementation of efficient electricity transmission network charges

    Energy Technology Data Exchange (ETDEWEB)

    Olmos, Luis; Perez-Arriaga, Ignacio J. [Instituto de Investigacion Tecnologica, Universidad Pontificia Comillas, Alberto Aguilera, 23, 28015 Madrid (Spain)

    2009-12-15

    This paper presents a comprehensive design of electricity transmission charges that are meant to recover regulated network costs. In addition, these charges must be able to meet a set of inter-related objectives. Most importantly, they should encourage potential network users to internalize transmission costs in their location decisions, while interfering as least as possible with the short-term behaviour of the agents in the power system, since this should be left to regulatory instruments in the operation time range. The paper also addresses all those implementation issues that are essential for the sound design of a system of transmission network charges: stability and predictability of the charges; fair and efficient split between generation and demand charges; temporary measures to account for the low loading of most new lines; number and definition of the scenarios to be employed for the calculation and format of the final charges to be adopted: capacity, energy or per customer charges. The application of the proposed method is illustrated with a realistic numerical example that is based on a single scenario of the 2006 winter peak in the Spanish power system. (author)

  9. Diversity of life. Effects of power generation and transmission on biodiversity difficult to assess

    Energy Technology Data Exchange (ETDEWEB)

    Hongisto, M.; Nikula, A.

    1996-11-01

    Scientific theories do not necessarily enable us to forecast the consequences of our actions on wildlife. Presumably, nature is able to adapt to environmental changes through variations on the genetic, species and ecosystem level; i.e. by means of biodiversity. The first studies conducted within the electricity sector show that the effects of emissions form an individual power plant on biodiversity are extremely difficult to assess because of long-range dispersion of the emission and many other factors simultaneously acting on the environment. Some concrete information about the impact of power transmission lines on biodiversity was obtained. These effects were primarily reversible. Some transmission line zones may even have favourable effects on biodiversity and on the living conditions of certain endangered species. (orig.)

  10. Diversity of life. Effects of power generation and transmission on biodiversity difficult to assess

    International Nuclear Information System (INIS)

    Hongisto, M.; Nikula, A.

    1996-01-01

    Scientific theories do not necessarily enable us to forecast the consequences of our actions on wildlife. Presumably, nature is able to adapt to environmental changes through variations on the genetic, species and ecosystem level; i.e. by means of biodiversity. The first studies conducted within the electricity sector show that the effects of emissions form an individual power plant on biodiversity are extremely difficult to assess because of long-range dispersion of the emission and many other factors simultaneously acting on the environment. Some concrete information about the impact of power transmission lines on biodiversity was obtained. These effects were primarily reversible. Some transmission line zones may even have favourable effects on biodiversity and on the living conditions of certain endangered species. (orig.)

  11. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  12. Evaluating congestion management in the Dutch electricity transmission grid

    International Nuclear Information System (INIS)

    Blijswijk, Martti J. van; Vries, Laurens J. de

    2012-01-01

    Due to the increase in electricity generation capacity in the Netherlands and a new connection policy, transmission system operator (TSO) TenneT expects a significant increase in congestion in the Dutch transmission grid. To manage this, the Dutch government implemented redispatching, a method which is argued in the literature to potentially impose large congestion costs upon the TSO. A quantitative model of the Dutch electricity system was developed in order to evaluate this method. The outcomes were compared to the performance of three alternative congestion management methods. Regardless of the method, congestion costs were found to be substantially lower than in previous studies. Because combined-cycle gas turbines are the marginal generation technology in almost all cases, the costs of up and down regulation do not differ much. Consequently, the redispatching costs for the TSO are expected to be relatively low, and the opportunities for abuse of market power appear to be limited. While all the evaluated methods are effective and economically efficient, they have significantly different welfare effects. Market splitting creates significantly larger welfare effects than the different varieties of redispatching. - Highlights: ► Congestion management was recently introduced in the Netherlands. ► We quantitatively evaluate the effects of its application. ► We compare this to other congestion management methods. ► Given the specific situation that the marginal cost curve of production is flat, congestion costs are expected to be low.

  13. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  14. Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

    2013-05-04

    Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar

  15. Integrating wind power in EU electricity systems. Economic and technical issues

    International Nuclear Information System (INIS)

    Van Werven, M.J.N.; Beurskens, L.W.M.; Pierik, J.T.G.

    2005-02-01

    In view of the ongoing process of liberalisation of the electricity market and the expected increase of wind power pursuant the RES-E Directive (Renewable Energy Sources - Electricity) and the need to minimise the costs of the RES-E targets, this study discusses the technical and economic impacts of integrating wind power into the electricity system. Furthermore, two options for reducing costs of intermittency are researched: forecasting of wind power output and electricity storage. An increasing penetration of wind power into the electricity system causes additional costs, partly due to the fact that the energy source of wind power is uncontrollable, variable (on the short term as well as on the longer term), and unpredictable (especially on the longer term). Consequently, balancing generation and demand becomes more complicated, creating a need for additional secondary and tertiary control. Although the sources of increasing costs are becoming more clearly understood, as are means to mitigate them, the quantification of costs of operating an electricity system with high wind penetration is very hard. Two possible options to reduce costs of intermittency are discussed in this report: forecasting of wind power output and electricity storage. The need for and benefit of wind energy forecasting have been increasingly recognised in recent years. Forecasting of wind power directs on increasing the predictability of the resource and improved forecasting can help to enhance the balancing of supply and demand. DG (distributed generation) operators can provide better information about their expected power output, energy suppliers can submit better estimates of electricity production to the TSO (Transmission System Operator), and system operators can improve network management through better information about expected power flows. Electricity storage systems can, at the same time, offer different services to a number of actors. Next to benefits that result from price

  16. International benchmarking of electricity transmission by regulators: A contrast between theory and practice?

    International Nuclear Information System (INIS)

    Haney, Aoife Brophy; Pollitt, Michael G.

    2013-01-01

    Benchmarking of electricity networks has a key role in sharing the benefits of efficiency improvements with consumers and ensuring regulated companies earn a fair return on their investments. This paper analyses and contrasts the theory and practice of international benchmarking of electricity transmission by regulators. We examine the literature relevant to electricity transmission benchmarking and discuss the results of a survey of 25 national electricity regulators. While new panel data techniques aimed at dealing with unobserved heterogeneity and the validity of the comparator group look intellectually promising, our survey suggests that they are in their infancy for regulatory purposes. In electricity transmission, relative to electricity distribution, choosing variables is particularly difficult, because of the large number of potential variables to choose from. Failure to apply benchmarking appropriately may negatively affect investors’ willingness to invest in the future. While few of our surveyed regulators acknowledge that regulatory risk is currently an issue in transmission benchmarking, many more concede it might be. In the meantime new regulatory approaches – such as those based on tendering, negotiated settlements, a wider range of outputs or longer term grid planning – are emerging and will necessarily involve a reduced role for benchmarking. -- Highlights: •We discuss how to benchmark electricity transmission. •We report survey results from 25 national energy regulators. •Electricity transmission benchmarking is more challenging than benchmarking distribution. •Many regulators concede benchmarking may raise capital costs. •Many regulators are considering new regulatory approaches

  17. Overview on the electric power in july 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during july 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in July 2003 has risen by 2.5% compared with July 2002. The July average temperature, which has been 2.3 deg. C higher in 2003 than in July 2002, has resulted in consumption linked to higher use of air-conditioning and agricultural sprinklers. Adjusted for climatic effects, monthly consumption has increased by 1.5% compared with July 2002. The consumption growth rate adjusted over 12 months has fallen by 0.2% since last month, whereas the national consumption growth rate over the last 12 months has fallen by 0.1%; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in July 2003, consumption has remained stable compared with July 2002, with increased deliveries to distribution networks (+0.7 TWh) compensating for the drop in deliveries to industrial consumers (-0.1 TWh) and exports (-0.5 TWh). Injections have risen slightly (+0.2 TWh) due to the combined effects of a substantial increase in thermal generation (+0.9 TWh) and imports (+0.1 TWh), which offset the considerable fall in hydro generation (-0.8 TWh); the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for

  18. Electric power annual 1997. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Annual 1997, Volume 2 contains annual summary statistics at national, regional, and state levels for the electric power industry, including information on both electric utilities and nonutility power producers. Included are data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold; financial statistics; environmental statistics; power transactions; and demand-side management. Also included are data for US nonutility power producers on installed capacity; gross generation; emissions; and supply and disposition of energy. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with historical data that may be used in understanding US electricity markets. 15 figs., 62 tabs.

  19. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  20. Electric Dipole Theory of Chemical Synaptic Transmission

    Science.gov (United States)

    Wei, Ling Y.

    1968-01-01

    In this paper we propose that chemicals such as acetylcholine are electric dipoles which when oriented and arranged in a large array could produce an electric field strong enough to drive positive ions over the junction barrier of the post-synaptic membrane and thus initiate excitation or produce depolarization. This theory is able to explain a great number of facts such as cleft size, synaptic delay, nonregeneration, subthreshold integration, facilitation with repetition, and the calcium and magnesium effects. It also shows why and how acetylcholine could act as excitatory or inhibitory transmitters under different circumstances. Our conclusion is that the nature of synaptic transmission is essentially electrical, be it mediated by electrical or chemical transmitters. PMID:4296121

  1. Project considerations and design of systems for wheeling cogenerated power

    Energy Technology Data Exchange (ETDEWEB)

    Tessmer, R.G. Jr.; Boyle, J.R.; Fish, J.H. III; Martin, W.A.

    1994-08-01

    Wheeling electric power, the transmission of electricity not owned by an electric utility over its transmission lines, is a term not generally recognized outside the electric utility industry. Investigation of the term`s origin is intriguing. For centuries, wheel has been used to describe an entire machine, not just individual wheels within a machine. Thus we have waterwheel, spinning wheel, potter`s wheel and, for an automobile, wheels. Wheel as a verb connotes transmission or modification of forces and motion in machinery. With the advent of an understanding of electricity, use of the word wheel was extended to be transmission of electric power as well as mechanical power. Today, use of the term wheeling electric power is restricted to utility transmission of power that it doesn`t own. Cogeneration refers to simultaneous production of electric and thermal power from an energy source. This is more efficient than separate production of electricity and thermal power and, in many instances, less expensive.

  2. Gas-to-power market and investment incentive for enhancing generation capacity: An analysis of Ghana's electricity sector

    International Nuclear Information System (INIS)

    Fritsch, Jorik; Poudineh, Rahmatallah

    2016-01-01

    Ghana's electricity generation capacity is currently insufficient to meet demand, making power outages and load shedding common. The resulting impact is potentially devastating for the country's growth prospects. Traditionally, lack of an affordable and reliable fuel supply for power generation, coupled with ineffective institutions and an unfavourable investment climate, have resulted in Ghana's electricity sector performing poorly. In light of the 2007 discovery of natural gas reserves in Ghanaian waters, this paper examines whether domestic gas could advance the performance of the electricity sector, and if so, how. The results of our analysis show that utilization of gas reserves in Ghana's gas-to-power market is an economically superior strategy compared to an export-oriented utilization scheme. The lack of an effective regulatory framework for investment, skill shortages, and an inefficient electricity pricing structure continue to be the main constraining factors. Our analysis also considers possible approaches to modification of the electricity tariff in order to send the right signal to potential investors in generation capacity, without compromising the affordability of power supply. - Highlights: •We examine if domestic gas can improve the Ghanaian electricity sector performance. •We compare domestic gas-to-power market utilisation versus gas export. •It shows that gas-to-power market is more economical compared to gas export. •Ineffective investment regime, skill shortage and inefficient tariffs are barriers.

  3. Using SMES as a multi-purpose interface in power generation, transmission and distribution systems

    International Nuclear Information System (INIS)

    Tam, K.S.; Zhang, X.; Yarali, A.

    1991-01-01

    This paper presents a new SMES schemes, the MSMES system, which significantly broadens the ways in which SMES can be applied to electric power systems. On the generation side, the SMES system can convert low-quality power into high-quality power and enhances the utilization of all energy sources available to the power systems. Acting both as an energy storage device and a power flow control device, a MSMES system can act as a hub in a power transmission system. The use of multiple MSMES systems can provide many new solutions to the problems facing the transmission networks of the United States today. On the distribution side, MSMES systems can be used as advanced power distribution centers that supply high-quality power to the customers while providing desirable load shapes to the power systems. In addition to these functions, a MSMES unit can also perform functions such as damping of power oscillation, stability and dynamic performance improvement and other recognized benefits of the conventional SMES system. Functioning as a multi-purpose power processing units, the MSMES systems improve the economics of SMES system. Functioning as a multi-purpose power processing units, the MSMES systems improve the economics of SMES technology and expand its potential market

  4. Rolling scheduling of electric power system with wind power based on improved NNIA algorithm

    Science.gov (United States)

    Xu, Q. S.; Luo, C. J.; Yang, D. J.; Fan, Y. H.; Sang, Z. X.; Lei, H.

    2017-11-01

    This paper puts forth a rolling modification strategy for day-ahead scheduling of electric power system with wind power, which takes the operation cost increment of unit and curtailed wind power of power grid as double modification functions. Additionally, an improved Nondominated Neighbor Immune Algorithm (NNIA) is proposed for solution. The proposed rolling scheduling model has further improved the operation cost of system in the intra-day generation process, enhanced the system’s accommodation capacity of wind power, and modified the key transmission section power flow in a rolling manner to satisfy the security constraint of power grid. The improved NNIA algorithm has defined an antibody preference relation model based on equal incremental rate, regulation deviation constraints and maximum & minimum technical outputs of units. The model can noticeably guide the direction of antibody evolution, and significantly speed up the process of algorithm convergence to final solution, and enhance the local search capability.

  5. Optimal Design of Wireless Power Transmission Links for Millimeter-Sized Biomedical Implants.

    Science.gov (United States)

    Ahn, Dukju; Ghovanloo, Maysam

    2016-02-01

    This paper presents a design methodology for RF power transmission to millimeter-sized implantable biomedical devices. The optimal operating frequency and coil geometries are found such that power transfer efficiency (PTE) and tissue-loss-constrained allowed power are maximized. We define receiver power reception susceptibility (Rx-PRS) and transmitter figure of merit (Tx-FoM) such that their multiplication yields the PTE. Rx-PRS and Tx-FoM define the roles of the Rx and Tx in the PTE, respectively. First, the optimal Rx coil geometry and operating frequency range are identified such that the Rx-PRS is maximized for given implant constraints. Since the Rx is very small and has lesser design freedom than the Tx, the overall operating frequency is restricted mainly by the Rx. Rx-PRS identifies such operating frequency constraint imposed by the Rx. Secondly, the Tx coil geometry is selected such that the Tx-FoM is maximized under the frequency constraint at which the Rx-PRS was saturated. This aligns the target frequency range of Tx optimization with the frequency range at which Rx performance is high, resulting in the maximum PTE. Finally, we have found that even in the frequency range at which the PTE is relatively flat, the tissue loss per unit delivered power can be significantly different for each frequency. The Rx-PRS can predict the frequency range at which the tissue loss per unit delivered power is minimized while PTE is maintained high. In this way, frequency adjustment for the PTE and tissue-loss-constrained allowed power is realized by characterizing the Rx-PRS. The design procedure was verified through full-wave electromagnetic field simulations and measurements using de-embedding method. A prototype implant, 1 mm in diameter, achieved PTE of 0.56% ( -22.5 dB) and power delivered to load (PDL) was 224 μW at 200 MHz with 12 mm Tx-to-Rx separation in the tissue environment.

  6. Investigation on Transmission and Substation Facilities of Sichuan Power Grid in Wenchuan Earthquake

    Institute of Scientific and Technical Information of China (English)

    Yu Yongqing; Li Guangfan; Li Peng; Zhu Quanjun; Yuan Dalu; Wang Chengyu; Li Jinzhong; Huang Huang; Li Lixin; Zhang Xinghai; Liu Jingmin

    2009-01-01

    @@ On May 12,2008,an earthquake of Ms 8.0 hit the area around Wenchuan County,Sichuan Province,China.It has been one of the most destructive earthquakes since the founding of P.R.China in 1949.The quake caused not only tremendous loss of life and wealth,but also severe damage to transmission and substation facilities.After the disaster,an expert group from China Electric Power Research Institute (CEPRI)was sent for on-site investigation.This paper is a summary of the investigation,in which suggestions for electric equipment to resist earthquake disasters are also proponed.

  7. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  8. The changing structure of the electric power industry: Selected issues, 1998

    International Nuclear Information System (INIS)

    1998-07-01

    More than 3,000 electric utilities in the United States provide electricity to sustain the Nation's economic growth and promote the well-being of its inhabitants. At the end of 1996, the net generating capability of the electric power industry stood at more than 776,000 megawatts. Sales to ultimate consumers in 1996 exceeded 3.1 trillion kilowatthours at a total cost of more than $210 billion. In addition, the industry added over 9 million new customers during the period from 1990 through 1996. The above statistics provide an indication of the size of the electric power industry. Propelled by events of the recent past, the industry is currently in the midst of changing from a vertically integrated and regulated monopoly to a functionally unbundled industry with a competitive market for power generation. Advances in power generation technology, perceived inefficiencies in the industry, large variations in regional electricity prices, and the trend to competitive markets in other regulated industries have all contributed to the transition. Industry changes brought on by this movement are ongoing, and the industry will remain in a transitional state for the next few years or more. During the transition, many issues are being examined, evaluated, and debated. This report focuses on three of them: how wholesale and retail prices have changed since 1990; the power and ability of independent system operators (ISOs) to provide transmission services on a nondiscriminatory basis; and how issues that affect consumer choice, including stranded costs and the determination of retail prices, may be handled either by the US Congress or by State legislatures

  9. The changing structure of the electric power industry: Selected issues, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    More than 3,000 electric utilities in the United States provide electricity to sustain the Nation`s economic growth and promote the well-being of its inhabitants. At the end of 1996, the net generating capability of the electric power industry stood at more than 776,000 megawatts. Sales to ultimate consumers in 1996 exceeded 3.1 trillion kilowatthours at a total cost of more than $210 billion. In addition, the industry added over 9 million new customers during the period from 1990 through 1996. The above statistics provide an indication of the size of the electric power industry. Propelled by events of the recent past, the industry is currently in the midst of changing from a vertically integrated and regulated monopoly to a functionally unbundled industry with a competitive market for power generation. Advances in power generation technology, perceived inefficiencies in the industry, large variations in regional electricity prices, and the trend to competitive markets in other regulated industries have all contributed to the transition. Industry changes brought on by this movement are ongoing, and the industry will remain in a transitional state for the next few years or more. During the transition, many issues are being examined, evaluated, and debated. This report focuses on three of them: how wholesale and retail prices have changed since 1990; the power and ability of independent system operators (ISOs) to provide transmission services on a nondiscriminatory basis; and how issues that affect consumer choice, including stranded costs and the determination of retail prices, may be handled either by the US Congress or by State legislatures.

  10. Analysis of main dynamic parameters of split power transmission

    Directory of Open Access Journals (Sweden)

    A. Janulevičius

    2008-06-01

    Full Text Available The review carried out had shown one basic approach of split power transmission to the organization of drive which is applied to stepless transmissions of tractors and parallel hybrid cars. In the split power transmission the power split device uses a planetary gear. Tractor engine power in the split power transmission is transmitted to the drive shaft via a mechanical and hydraulic path. The theoretical analysis of main parameters of the split power transmission of the tractor is presented. The angular velocity of sun and coronary gears of the differential set is estimated by solution of the system of equations in which one equation is made for planetary differential gear, and another – for hydrostatic drive. The analysis of the transmission gear-ratio dependencies on the ratio of hydraulic machines capacities is carried out. Dependence of the variation of angular velocity of the coronary and the sun gears on the ground speed of the tractor is presented. Dependence of sum shaft torque and its constituents, carried by mechanical and hydraulic lines, on sum shaft angular velocity and ground speed of tractor and engine speed is also presented.

  11. Study of electric and magnetic fields on transmission lines using a computer simulation program

    International Nuclear Information System (INIS)

    Robelo Mojica, Nelson

    2011-01-01

    A study was conducted to determine and reduce levels of electric and magnetic fields with different configurations used by the Instituto Costarricense de Electricidad in power transmission lines in Costa Rica. The computer simulation program PLS-CADD with EPRI algorithm has been used to obtain field values close to those actual to lines easements that have worked to date. Different configurations have been compared on equal terms and the lowest levels of electric and magnetic fields are determined. The most appropriate configuration of the tower has been obtained and therefore has decreased exposure to electromagnetic fields people, without affecting the energy demand of the population. (author) [es

  12. Electric power annual 1995. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This document summarizes pertinent statistics on various aspects of the U.S. electric power industry for the year and includes a graphic presentation. Data is included on electric utility retail sales and revenues, financial statistics, environmental statistics of electric utilities, demand-side management, electric power transactions, and non-utility power producers.

  13. Micro-economic analysis of the physical constrained markets: game theory application to competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Bompard, E.; Ma, Y.C. [Politecnico di Torino, Dept. of Electrical Engineering, Torino (Italy); Ragazzi, E. [CERIS, Institute for Economic Research on Firms and Growth, CNR, National Research Council, Moncalieri, TO (Italy)

    2006-03-15

    Competition has been introduced in the electricity markets with the goal of reducing prices and improving efficiency. The basic idea which stays behind this choice is that, in competitive markets, a greater quantity of the good is exchanged at a lower price, leading to higher market efficiency. Electricity markets are pretty different from other commodities mainly due to the physical constraints related to the network structure that may impact the market performance. The network structure of the system on which the economic transactions needs to be undertaken poses strict physical and operational constraints. Strategic interactions among producers that game the market with the objective of maximizing their producer surplus must be taken into account when modeling competitive electricity markets. The physical constraints, specific of the electricity markets, provide additional opportunity of gaming to the market players. Game theory provides a tool to model such a context. This paper discussed the application of game theory to physical constrained electricity markets with the goal of providing tools for assessing the market performance and pinpointing the critical network constraints that may impact the market efficiency. The basic models of game theory specifically designed to represent the electricity markets will be presented. IEEE30 bus test system of the constrained electricity market will be discussed to show the network impacts on the market performances in presence of strategic bidding behavior of the producers. (authors)

  14. Micro-economic analysis of the physical constrained markets: game theory application to competitive electricity markets

    Science.gov (United States)

    Bompard, E.; Ma, Y. C.; Ragazzi, E.

    2006-03-01

    Competition has been introduced in the electricity markets with the goal of reducing prices and improving efficiency. The basic idea which stays behind this choice is that, in competitive markets, a greater quantity of the good is exchanged at a lower price, leading to higher market efficiency. Electricity markets are pretty different from other commodities mainly due to the physical constraints related to the network structure that may impact the market performance. The network structure of the system on which the economic transactions need to be undertaken poses strict physical and operational constraints. Strategic interactions among producers that game the market with the objective of maximizing their producer surplus must be taken into account when modeling competitive electricity markets. The physical constraints, specific of the electricity markets, provide additional opportunity of gaming to the market players. Game theory provides a tool to model such a context. This paper discussed the application of game theory to physical constrained electricity markets with the goal of providing tools for assessing the market performance and pinpointing the critical network constraints that may impact the market efficiency. The basic models of game theory specifically designed to represent the electricity markets will be presented. IEEE30 bus test system of the constrained electricity market will be discussed to show the network impacts on the market performances in presence of strategic bidding behavior of the producers.

  15. Scenarios for Deep Carbon Emission Reductions from Electricity by 2050 in Western North America using the Switch Electric Power Sector Planning Model: California's Carbon Challenge Phase II, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel; Wei, Max; Greenblatt, Jeffrey

    2014-01-01

    This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to the present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was

  16. Electricity transmission pricing: Tracing based point-of-connection tariff

    International Nuclear Information System (INIS)

    Abhyankar, A.R.; Khaparde, S.A.

    2009-01-01

    Point-of-connection (POC) scheme of transmission pricing in decentralized markets charges the participants a single rate per MW depending on their point-of-connection. Use of grossly aggregated postage stamp rates as POC charges fails to provide appropriate price signals. The POC tariff based on distribution of network sunk costs by employing conventional tracing assures recovery of sunk costs based on extent of use of network by participants. However, the POC tariff by this method does not accommodate economically efficient price signals which correspond to marginal costs. On the other hand, the POC tariff, if made proportional to marginal costs alone, fails to account for sunk costs and extent of use of network. This paper overcomes these lacunae by combining the above stated desired objectives under the recently proposed optimal tracing framework. Since real power tracing problem is amenable to multiple solutions, it is formulated as linearly constrained optimization problem. By employing this methodology, consideration of extent of network use and sunk cost recovery are guaranteed, while objective function is designed such that the spatial pattern of price signals closely follows the pattern of scaled locational marginal prices. The methodology is tested on IEEE 30 bus system, wherein average power flow pattern is established by running various simulation states on congested and un-congested network conditions. (author)

  17. Power delivery in the 21. century : part 1, getting electricity from the point of generation to the point of use

    International Nuclear Information System (INIS)

    Douglas, J.

    2000-01-01

    The challenges facing the U.S. electric power industry in meeting the power quality demands of a digital society were discussed. The management of power delivery will become increasingly difficult as power loading continues to grow with deregulation. The 1992 Energy Policy Act required open access to utility transmission lines, while Orders 888 and 889 of the Federal Regulatory Commission ruled for wholesale power dealing. This stimulated such a growth that almost half of U.S. domestic power is sold in the wholesale electricity market, but operators are close to their stability limits. The recent and costly outages in western U.S. suggest that more transmission capacity is needed, but obtaining permits is difficult and an adequate rate of return on investment is uncertain. Some states are further complicating the issue by implementing retail access to provide consumers a choice among service providers. Concerns over transmission system integrity are founded in the fact that various infrastructures such as transportation, telecommunications, oil and gas, and financial systems, rely on the electric power infrastructure. If power failure occurs in one sector, it can readily propagate to another, multiplying the damage. The President's Council on Critical Infrastructure Protection has identified some policy objectives to ensure the development of effective technology responses to policy concerns to improve the reliability and security of the power system. Advanced control technologies such as High-voltage electronic FACTS (Flexible AC Transmission System), WAMS (Wide-Area Measurement System) and the use of high-temperature super-conducting materials created from ceramic oxides will be instrumental to upgrading the power delivery system which will be the key to U.S. economic growth. These advanced technologies could be in widespread use by 2005-2010. 1 fig

  18. Power Requirements Determined for High-Power-Density Electric Motors for Electric Aircraft Propulsion

    Science.gov (United States)

    Johnson, Dexter; Brown, Gerald V.

    2005-01-01

    Future advanced aircraft fueled by hydrogen are being developed to use electric drive systems instead of gas turbine engines for propulsion. Current conventional electric motor power densities cannot match those of today s gas turbine aircraft engines. However, if significant technological advances could be made in high-power-density motor development, the benefits of an electric propulsion system, such as the reduction of harmful emissions, could be realized.

  19. 4th International Conference on Power Transmissions

    CERN Document Server

    2013-01-01

    This books contains the Proceedings of the 4th International Conference on Power Transmissions, that was held in Sinaia, Romania from June 20 -23, 2012. Power Transmissions is a very complex and multi-disciplinary scientific field of Mechanical Engineering that covers the different types of transmissions (mechanical, hydraulic, pneumatic) as well as all the machine elements involved, such as gears, bearings, shafts, couplings and a lot more. It concerns not only their basic theory but also their design, analysis, testing, application and maintenance. The requirements set to modern power transmissions are really tough to meet: They need to be more efficient, stronger, smaller, noiseless, easier to produce and to cost less. There is a strong demand to become easier in operation and maintenance, or even automatic and in maintenance-free. Last but not least, they should be easily recycled and respect the environment. Joint efforts of specialists from both academia and industry can significantly contribute to fulf...

  20. The optimization of wireless power transmission: design and realization.

    Science.gov (United States)

    Jia, Zhiwei; Yan, Guozheng; Liu, Hua; Wang, Zhiwu; Jiang, Pingping; Shi, Yu

    2012-09-01

    A wireless power transmission system is regarded as a practical way of solving power-shortage problems in multifunctional active capsule endoscopes. The uniformity of magnetic flux density, frequency stability and orientation stability are used to evaluate power transmission stability, taking into consideration size and safety constraints. Magnetic field safety and temperature rise are also considered. Test benches are designed to measure the relevent parameters. Finally, a mathematical programming model in which these constraints are considered is proposed to improve transmission efficiency. To verify the feasibility of the proposed method, various systems for a wireless active capsule endoscope are designed and evaluated. The optimal power transmission system has the capability to supply continuously at least 500 mW of power with a transmission efficiency of 4.08%. The example validates the feasibility of the proposed method. Introduction of novel designs enables further improvement of this method. Copyright © 2012 John Wiley & Sons, Ltd.

  1. Novel approach to assess local market power considering transmission constraints

    International Nuclear Information System (INIS)

    Li, Canbing; Xia, Qing; Kang, Chongqing; Jiang, Jianjian

    2008-01-01

    Market power (MP) assessment and mitigation affect the efficiency of the generation market. The traditional indices such as HHI and Lerner index can not express local market power, which caused by transmission constraints. Transmission constraints divide the market into some smaller parts. Some generators can abuse their MP in one part but not in the whole market. This paper describes a new approach to assess market power. The main contributions of the new method can be summarized as following. First, the concept of local market is developed, and the whole power system is divided into several local markets, as transmission congestions dividing the market. In the local markets, there are no transmission constraints so local market power does not exist. Then the local market power index (LMPI) is calculated according to market concentration, transmission constraints, and demand-supply ratio. Based on LMPI, the integrated local market power index which describes the whole picture of market can be obtained. It has been proved that the new approach can assess market power exactly, and identify the critical factor that results in market power and where generators are easy to exercise market power. The finding in this paper is helpful for market monitoring and mitigating market power. Moreover, the new index can be used to evaluate the power grid availability to generation competition and the power transmission expansion planning. (author)

  2. Using Geothermal Electric Power to Reduce Carbon Footprint

    Science.gov (United States)

    Crombie, George W.

    Human activities, including the burning of fossil fuels, increase carbon dioxide levels, which contributes to global warming. The research problem of the current study examined if geothermal electric power could adequately replace fossil fuel by 2050, thus reducing the emissions of carbon dioxide while avoiding potential problems with expanding nuclear generation. The purpose of this experimental research was to explore under what funding and business conditions geothermal power could be exploited to replace fossil fuels, chiefly coal. Complex systems theory, along with network theory, provided the theoretical foundation for the study. Research hypotheses focused on parameters, such as funding level, exploration type, and interfaces with the existing power grid that will bring the United States closest to the goal of phasing out fossil based power by 2050. The research was conducted by means of computer simulations, using agent-based modeling, wherein data were generated and analyzed. The simulations incorporated key information about the location of geothermal resources, exploitation methods, transmission grid limits and enhancements, and demand centers and growth. The simulation suggested that rapid and aggressive deployment of geothermal power plants in high potential areas, combined with a phase out of coal and nuclear plants, would produce minimal disruptions in the supply of electrical power in the United States. The implications for social change include reduced risk of global warming for all humans on the planet, reduced pollution due to reduction or elimination of coal and nuclear power, increased stability in energy supply and prices in the United States, and increased employment of United States citizens in jobs related to domestic energy production.

  3. Market Surveillance Panel Report : constrained off payments and other issues in the management of congestion

    International Nuclear Information System (INIS)

    2003-01-01

    In October 2002, the Market Surveillance Panel (MSP), an independent body appointed by and accountable to Ontario's Independent Electricity Market Operator (IMO), expressed concerns regarding the need to enhance transmission capability to relieve congestion. Concerns were also expressed for the lack of outage coordination among generators and transmitters. A stressed transmission system is a barrier to market efficiency and competition. It also prevents low cost generation from running, thereby requiring replacement by more expensive supply. The MSP examined the efficiency of the electricity market by looking at how off payments of the Congestion Management Settlement Credits (CMSC) improve the efficiency of the market. Following a consultation process with market participants, the MSP determined that constrained off CMSC payments could be eliminated without any reduction in market efficiency. This report presents a series of recommendations to reduce constrained off CMSC payments in some cases, and to eliminate them in others. The report also describes the mechanics of a CMSC review for hydroelectric facilities, as well as CMSC payments related to the 25 Hz sub-system. Barriers to effective transmission planning were noted and suggestions for reform were presented

  4. International trade with electric power

    OpenAIRE

    Årdal, Frode

    2009-01-01

    In 2003 the European Commission introduced the Directive 2003/54/EC and Regulation 1228/2003/EC which increased the focus on the liberalization of the European electricity market. The international electricity trade has increased and created new challenges related to cross-border transmission and compensation mechanisms. The focus of the report has been to discuss the development of the electricity market in Europe, and the status of international exchange. The report also discusses the con...

  5. Electric power annual 1995. Volume I

    International Nuclear Information System (INIS)

    1996-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with data that may be used in understanding U.S. electricity markets. The Electric Power Annual is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy. In the private sector, the majority of the users of the Electric Power Annual are researchers and analysts and, ultimately, individuals with policy- and decisionmaking responsibilities in electric utility companies. Financial and investment institutions, economic development organizations interested in new power plant construction, special interest groups, lobbyists, electric power associations, and the news media will find data in the Electric Power Annual useful. In the public sector, users include analysts, researchers, statisticians, and other professionals with regulatory, policy, and program responsibilities for Federal, State, and local governments. The Congress and other legislative bodies may also be interested in general trends related to electricity at State and national levels. Much of the data in these reports can be used in analytic studies to evaluate new legislation. Public service commissions and other special government groups share an interest in State-level statistics. These groups can also compare the statistics for their States with those of other jurisdictions

  6. Auction game in electric power market place

    International Nuclear Information System (INIS)

    Kumar, J.; Sheble, G.

    1996-01-01

    The power industry in the US is presently an evolving changing business environment. While planning to meet future peak demand is still a concern, the efficient utilization of existing generation and transmission resources is fast becoming a primary interest. This interest suggests a move from cost-based market operations to price based market operations. Auction market structure is one of the various ways to perform price based operation. Such a market place would be very new and challenging to all players of the electric power industry. This paper describes an overview of the new business environment. The paper presents a detailed description of the auction game. The trading objectives in the bidding game are defined. The framework of auction process is described by defining the rules to play the game. Finally, strategies for market players are discussed

  7. Market power in the Nordic electricity wholesale market: A survey of the empirical evidence

    International Nuclear Information System (INIS)

    Fridolfsson, Sven-Olof; Tangeras, Thomas P.

    2009-01-01

    We review the recent empirical research assessing market power on the Nordic wholesale market for electricity, Nord Pool. The studies find no evidence of systematic exploitation of system level market power on Nord Pool. Local market power arising from transmission constraints seems to be more problematic in some price areas across the Nordic countries. Market power can manifest itself in a number of ways that have so far escaped empirical scrutiny. We discuss investment incentives, vertical integration and buyer power, as well as withholding of base-load (nuclear) capacity.

  8. Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure

    International Nuclear Information System (INIS)

    Kazempour, S. Jalal; Moghaddam, Mohsen Parsa

    2011-01-01

    This work addresses a relevant methodology for self-scheduling of a price-taker fuel and emission constrained power producer in day-ahead correlated energy, spinning reserve and fuel markets to achieve a trade-off between the expected profit and the risk versus different risk levels based on Markowitz's seminal work in the area of portfolio selection. Here, a set of uncertainties including price forecasting errors and available fuel uncertainty are considered. The latter uncertainty arises because of uncertainties in being called for reserve deployment in the spinning reserve market and availability of power plant. To tackle the price forecasting errors, variances of energy, spinning reserve and fuel prices along with their covariances which are due to markets correlation are taken into account using relevant historical data. In order to tackle available fuel uncertainty, a framework for self-scheduling referred to as rolling window is proposed. This risk-constrained self-scheduling framework is therefore formulated and solved as a mixed-integer non-linear programming problem. Furthermore, numerical results for a case study are discussed. (author)

  9. Restructured electric power systems analysis of electricity markets with equilibrium models

    CERN Document Server

    2010-01-01

    Electricity market deregulation is driving the power energy production from a monopolistic structure into a competitive market environment. The development of electricity markets has necessitated the need to analyze market behavior and power. Restructured Electric Power Systems reviews the latest developments in electricity market equilibrium models and discusses the application of such models in the practical analysis and assessment of electricity markets.

  10. A fuzzy-stochastic simulation-optimization model for planning electric power systems with considering peak-electricity demand: A case study of Qingdao, China

    International Nuclear Information System (INIS)

    Yu, L.; Li, Y.P.; Huang, G.H.

    2016-01-01

    In this study, a FSSOM (fuzzy-stochastic simulation-optimization model) is developed for planning EPS (electric power systems) with considering peak demand under uncertainty. FSSOM integrates techniques of SVR (support vector regression), Monte Carlo simulation, and FICMP (fractile interval chance-constrained mixed-integer programming). In FSSOM, uncertainties expressed as fuzzy boundary intervals and random variables can be effectively tackled. In addition, SVR coupled Monte Carlo technique is used for predicting the peak-electricity demand. The FSSOM is applied to planning EPS for the City of Qingdao, China. Solutions of electricity generation pattern to satisfy the city's peak demand under different probability levels and p-necessity levels have been generated. Results reveal that the city's electricity supply from renewable energies would be low (only occupying 8.3% of the total electricity generation). Compared with the energy model without considering peak demand, the FSSOM can better guarantee the city's power supply and thus reduce the system failure risk. The findings can help decision makers not only adjust the existing electricity generation/supply pattern but also coordinate the conflict interaction among system cost, energy supply security, pollutant mitigation, as well as constraint-violation risk. - Highlights: • FSSOM (Fuzzy-stochastic simulation-optimization model) is developed for planning EPS. • It can address uncertainties as fuzzy-boundary intervals and random variables. • FSSOM can satisfy peak-electricity demand and optimize power allocation. • Solutions under different probability levels and p-necessity levels are analyzed. • Results create tradeoff among system cost and peak-electricity demand violation risk.

  11. A Common Definition of the System Operators' Core Activities[Electric Power Transmission System Operator

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-02-15

    In this report a common definition of the system operator's core activities in the Nordic countries is identified and also a list of non-core activities is introduced. As a starting point the common tasks for system responsibility as identified by Nordel has been used for the work. The term TSO (Transmission System Operator) is employed as a common denominator in the report. It is found out that the TSOs carry out common core activities in the roles as a transmission operator, a system operator and a balance settlement responsible. The core activities for the TSO as a transmission network operator are: Maintain the adequate transmission system in the long run and network development plan on the national as well as on the Nordic level using sophisticated analysis and planning methods and tools. Plan the transmission network on the national as well as on the Nordic level utilising new investments, renewal and maintenance of existing network components so that the network is secure to operate and adequate transmission capacity is guaranteed. Aim at timely network expansions using enhanced information exchange between the Nordic TSOs, and on the national level between the TSO and distribution and regional network operators, large consumers and large producers. Secure the technical compatibility with networks across the border and within a country by establishing connection requirements on the national level and ensuring that the national requirements are compatible across the Nordic power system. The core activities for the TSO as a system operator are: Define common technical requirements for the secure system operation using common planning, operation, connection and data exchange procedures. Secure the system operation with the operational planning for the following year by using information exchange between TSOs enabling the TSOs to make the best possible forecast of the global grid situation in order to assess the flows in their network and the available

  12. 55th electric science promotion prize (progress prize). Demonstration of optical soliton transmission on OPGW first in the world; Dai 55 kai denki gakujutsu shinkosho (shinposho) jusho. Seiaihatsu no OPGW ni okeru hikari soriton denso no jissho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-10

    Electric science promotion prize (progress prize) is given to `Person who newly proposed a new concept, theory, material, device, system and method on electrical science and technology, or demonstrated these proposals` by the commendation committee of Institute of Electrical Engineers of Japan every year. Eight promotion prizes including that for Kansai Electric Power`s `Demonstration of optical soliton transmission on OPGW first in the world` were given. This research succeeded in development of the transmission/ receiving device suitable for optical soliton transmission, and the prediction method of an optimum transmission condition by computer simulation. In addition, this research succeeded in 10Gbit transmission of 784km and 40Gbit transmission (4-wave multiplex) of 392km by applying the above research result to Okurobe trunk line OPGW (98.2km). This demonstration of optical soliton transmission on OPGW is first in the world. (NEDO)

  13. Electric power: Past, present, and future

    International Nuclear Information System (INIS)

    Schnetzer, H.

    1994-01-01

    When, at the turn of the century, public electric power supply facilities were created and in 1908, the electric power stations of the Swiss canton of Zurich (EKZ) were built, only a third of the communities in the Zurich area could boast about being the consumers of this new energy. But what did the first electrically powered devices and machines look like? This, and more, is presented in the ''electric power house'' in Burenwisen Glattfelden in the canton of Zurich. Besides a Kaplan turbine and a sample of the most interesting devices from the past and the present, the focus of the exhibition is on the presentation of the new and old sources of light. The EKZ are pleased to be able to present their ''electric power house'' to the public, providing a broad range of information on energy-related questions and the development of electric power supply. (orig.) [de

  14. Losses at magnetic nulls in pulsed-power transmission line systems

    International Nuclear Information System (INIS)

    Mendel, C.W. Jr.; Pointon, T.D.; Savage, M.E.; Seidel, D.B.; Magne, I.; Vezinet, R.

    2006-01-01

    Pulsed-power systems operating in the terawatt regime must deal with large electron flows in vacuum transmission lines. In most parts of these transmission lines the electrons are constrained by the self-magnetic field to flow parallel to the conductors. In very low impedance systems, such as those used to drive Z-pinch radiation sources, the currents from multiple transmission lines are added together. This addition necessarily involves magnetic nulls that connect the positive and negative electrodes. The resultant local loss of magnetic insulation results in electron losses at the anode in the vicinity of the nulls. The lost current due to the magnetic null might or might not be appreciable. In some cases the lost current due to the null is not large, but is spatially localized, and may create a gas and plasma release from the anode that can lead to an excessive loss, and possibly to catastrophic damage to the hardware. In this paper we describe an analytic model that uses one geometric parameter (aside from straightforward hardware size measurements) that determines the loss to the anode, and the extent of the loss region when the driving source and load are known. The parameter can be calculated in terms of the magnetic field in the region of the null calculated when no electron flow is present. The model is compared to some experimental data, and to simulations of several different hardware geometries, including some cases with multiple nulls, and unbalanced feeds

  15. Transmission Power Control for Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Kuo-Hsien Hsia

    2017-02-01

    Full Text Available Wireless sensor networks can be widely applied for a security system or a smart home system. Since some of the wireless remote sensor nodes may be powered by energy storage devices such as batteries, it is a very important issue to transmit signals at lower power with the consideration of the communication effectiveness. In this paper, we will provide a fuzzy controller with two inputs and one output for received signal strength indicator (RSSI and link quality indicator (LQI to adjust transmission power suitably in order to maintaining a certain communication level with a reduced energy consumption. And we will divide the sampling period of a sensor node into four intervals so that the sensor node radio device does not in receiving or transmission status all the time. Hence the sensor node can adjust transmission power automatically and reduce sensor node power consumption. Experimental results show that the battery life can be extended to about 10 times for the designed sensor node comparing to a normal node.

  16. Electric power statistics from independence to establishment

    International Nuclear Information System (INIS)

    1997-02-01

    This paper reports power statistics from independence to establishment pf KEPIC. It has the lists of electricity industry, electric equipment on the whole country power equipment at the independence and development of power facility, power generation about merit of power plants, demand according to types and use, power loss, charge for electric power distribution, power generation and generating cost, financial lists on income measurement and financing, meteorological phenomena and amount of rainfall electric power development, international statistics on major countries power generation and compare power rates with general price.

  17. Participation of nuclear power plants in variable operation regimes under conditions of combined electric power and heat generation

    International Nuclear Information System (INIS)

    Rydzi, S.

    1988-01-01

    The incorporation of nuclear power units in the control of the output of an electric power system is affected by technical and economic factors as well as by the manner of heat take-off from the nuclear power unit for heating purposes. The effect was therefore studied of the technological solution of converting the heat output of WWER-440 units to operating parameters of turbines in nonrated regimes of operation. Some results of the study are graphically represented. An analysis was also made of limitations preventing WWER-440 units from supplying heat with regard to their incorporation in the electric power transmission system. The results show that using nuclear power units for district heating will in the future strictly determine the seasonal shut-down of nuclear units for fuel exchange and overhauls. This could interfere with the considered concept of the 1.5 year duty time of WWER-440 reactors. With regard to the economy of operation of the nuclear power system and reduced demands on weekend unloading it will be necessary to incorporate in the power system pumped-storage power plants with one-week pumped-storage systems. (Z.M.). 5 figs., 2 tabs., 6 refs

  18. Performances of nuclear power plants for combined production of electricity and hot water for district heating

    International Nuclear Information System (INIS)

    Bronzen, S.

    The possibilities for using nuclear power plants for combined production of heat and power seem to be very good in the future. With the chosen 600 MWsub (e) BWR plant a heat output up to 1200 MW can be arranged. An alternative, consisting of steam extractions from the low-pressure turbine, offers a flexible solution for heat and power generation. With this alternative the combined plant can use components from normal condensing nuclear power plants. The flexible extraction design also offers a real possibility for using the combined plant in electric peak generation. However, urban siting requires long distance heat transmission and the pipe design for this transmission is a major problem when planning and optimizing the whole nuclear combined heat and power plant. (author)

  19. Electric power. Avoiding a new accident as on the Drac river; Electricite. Pour eviter un nouvel accient du Drac

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    A new inter-ministerial decree has been prescribed in France, in order to avoid any repetition of an accident where school children were drowned on a riverside, following a water release from an upstream hydraulic plant: risk analysis on every plant of this type, regulation on site access and utilization, regulation on hydraulic plant operation conditions. Other news concern power transmission de-concentration, domestic equipment regulations, EDF international strategy, rural electric power management, researches on electric power storage

  20. Electric power. Avoiding a new accident as on the Drac river; Electricite. Pour eviter un nouvel accient du Drac

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    A new inter-ministerial decree has been prescribed in France, in order to avoid any repetition of an accident where school children were drowned on a riverside, following a water release from an upstream hydraulic plant: risk analysis on every plant of this type, regulation on site access and utilization, regulation on hydraulic plant operation conditions. Other news concern power transmission de-concentration, domestic equipment regulations, EDF international strategy, rural electric power management, researches on electric power storage