  1. HWMA/RCRA Closure Plan for the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System

    International Nuclear Information System (INIS)

    K. Winterholler

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards

  2. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  3. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  4. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... mail. In addition, for facilities without approved post-closure plans, it must also be provided during... requirements. At the end of the specified period of suspension, the Regional Ad-min-is-tra-tor would then...

  5. 100-D Ponds closure plan. Revision 1

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure

  6. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  7. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  8. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  9. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  10. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  11. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  12. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  13. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  14. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  15. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  16. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  17. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  18. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  19. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  20. 218-E-8 Borrow Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The 218-E-8 Demolition Site was the site of a single demolition event in November of 1984. This demolition event was a form of thermal treatment for discarded explosive chemical products. Because the 218-E-8 Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations,'' Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 218-E-8 Borrow Pit Demolition Site Closure Plan consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3, Revision 4, and a closure plan. An explanation of the Part A Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the 218-E-8 Demolition Site, the history of the waste treated, and the approach that will be followed to close the 218-E-8 Demolition Site. Because there were no radioactively contaminated chemicals involved in t he demolitions at the 218-E-8 Borrow Pit site, the information on radionuclides is provided for ''information only.'' Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from 218-E-8 Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  1. Closure Plan for the E-Area Low-Level Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    2000-10-30

    A closure plan has been developed to comply with the applicable requirements of the U.S. Department of Energy Order 435.2 Manual and Guidance. The plan is organized according to the specifications of the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans.

  2. Closure Plan for the E-Area Low-Level Waste Facility

    International Nuclear Information System (INIS)

    Cook, J.R.

    2000-01-01

    A closure plan has been developed to comply with the applicable requirements of the U.S. Department of Energy Order 435.2 Manual and Guidance. The plan is organized according to the specifications of the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans

  3. Improving environmental performance through mine closure planning

    International Nuclear Information System (INIS)

    McKee, W.; McKenna, G.

    1998-01-01

    Syncrude has been investigating landscape redevelopment concepts since 1995 after a two-year tailings technology selection study resulted in a major shift in their long-term tailings disposal strategy. The change from fluid disposal to solid disposal of tailings leads to a different landscape, incorporating a new water material type, new landforms and a new schedule of reclamation activity. A multidisciplinary approach was needed to assess, design and develop the final landscape. Planning approach in progress at Syncrude Canada was described, and the basic concepts and tools of closure planning discovered to date were outlined. The economic impacts of closure planning on mining and tailings operations in general, were discussed. 14 refs

  4. Interim status of closure/post-closure plan for 183-H solar evaporation basins

    International Nuclear Information System (INIS)

    1988-03-01

    This report describes a plan for decommissioning several solar evaporation basins on the Hanford reservation. The document describes procedures for sampling during decommissioning and a plan for certification of the resulting completed landfill. Additional plans deal with the training, security of the site, and post-closure monitoring

  5. Transuranic Storage Area (TSA)-2 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Lodman, D.W.; Spry, M.J.; Nolte, E.P.; Barry, G.A.

    1992-11-01

    This document describes the proposed plans for closure of the Transuranic Storage Area (TSA)-2 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. Future plans for the unit include incorporating the earthen-covered portion of the TSA-2 pad into a TSA retrieval enclosure along with the TSA-1 and TSAR pads, and closure of the portion of the TSA-2 pad under the Air Support Weather Shield (ASWS-2). This plan addresses closure of the ASWS-2 by decontaminating structures and equipment that may have contacted the waste. Sufficient sampling and documentation of all closure activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  6. 304 Concretion facility closure plan

    International Nuclear Information System (INIS)

    1990-04-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium Zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets in the 304 Concretion Facility, located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Concretion Facility (304 Facility). Clean closure of the 304 Facility is the proposed method for closure of the facility. Justification for this proposal is presented. 15 refs., 22 figs., 4 tabs

  7. PFO closuRE and CryptogenIc StrokE (PRECISE) registry

    DEFF Research Database (Denmark)

    Wöhrle, Jochen; Bertrand, Bernard; Søndergaard, Lars

    2012-01-01

    The Premere™ PFO closure device has a special design for closure of patent foramen ovale (PFO) including a flexible distance and angulation between the right and left disc providing minimal septal distortion. The primary objective of the study was to determine the degree of risk for stroke or tra...... or transient ischemic attack (TIA) in patients after Premere™ PFO closure device implantation....

  8. 324 Building REC and HLV Tank Closure Plan

    International Nuclear Information System (INIS)

    Becker-Khaleel, B.; Schlick, K.

    1995-12-01

    This closure plan describes the activities necessary to close the 324 Radiochemical Engineering Cells (REC) and High-Level Vault (HLV) in accordance with the Washington State Dangerous Waste regulations. To provide a complete description of the activities required, the closure plan relies on information contained in the 324 Building B-Cell Safety Cleanout Project (BCCP) plans, the 324 Building REC HLV Interim Waste Management Plan (IWMP), the Project Management Plan for Nuclear Facilities Management 300 Area Compliance Program, and the 324 High Level Vault Interim Removal Action Project (project management plan [PMP]). The IWMP addresses the management of mixed waste in accordance with state and federal hazardous waste regulations. It provides a strategy for managing high-activity mixed waste in compliance with Resource Conservation and Recovery Act (RCRA) requirements or provides for an alternative management approach for the waste. The BCCP outlines the past, present, and future activities necessary for removing from B-Cell the solid waste, including mixed waste generated as a result of historical research and development (R ampersand D) activities conducted in the cell. The BCCP also includes all records and project files associated with the B-Cell cleanout. This information is referenced throughout the closure plan. The PMP sets forth the plans, organization, and systems that Pacific Northwest National Laboratory (PNNL) will use to direct and control the 324 High-Level Vault Interim Removal Action Project. This project will develop and implement a treatment strategy that will remove and stabilize the inventory of liquid waste from the 324 HLV tanks. The PMP also provides for flushing and sampling the flush solution

  9. Hexone Storage and Treatment Facility closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The HSTF is a storage and treatment unit subject to the requirements for the storage and treatment of dangerous waste. Closure is being conducted under interim status and will be completed pursuant to the requirements of Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and WAC 173-303-640. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. The known hazardous/dangerous waste remaining at the site before commencing other closure activities consists of the still vessels, a tarry sludge in the storage tanks, and residual contamination in equipment, piping, filters, etc. The treatment and removal of waste at the HSTF are closure activities as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and WAC 173-303

  10. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  11. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  12. Land use-based landscape planning and restoration in mine closure areas.

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  13. Land Use-Based Landscape Planning and Restoration in Mine Closure Areas

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P.; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  14. 304 Concretion Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with Zircaloy-2 and copper silicon allo , uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets (7.5-gal containers) in the 304 Concretion Facility (304 Facility), located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA) and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040 (Ecology 1991). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Facility. The strategy for closure of the 304 Facility is presented in Section 6.0

  15. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  16. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  17. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  18. Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure

  19. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  20. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  1. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  2. Corporate strategy and viable future land use: Planning for closure from the outset of mining

    International Nuclear Information System (INIS)

    Warhurst, A.

    2000-01-01

    This paper provides an overview of the environmental impact of mining on viable future land use and underlines the imperative of improved environmental management and closure planning. It argues that pollution prevention, through planning for closure, can lead to cost-effective strategies for sustainable minerals development and viable future land use. This seems to be most true for greenfield sites since, generally, the earlier closure planning and pollution prevention is built into a project, the more cost-effective and environmentally benign closure will be. Further, for greenfield sites, pollution prevention techniques can be employed from the outset, at the stages of exploration and mine development, and then monitored and improved through the operation stage to closure, and can be kept in place to manage future land use. The paper discusses how global changes in the industry, following the liberalisation of investment regimes, and mergers and strategic alliances between key firms, has, by virtue of the diffusion of new technology, led to further opportunities to prevent pollution and optimise future land use through planning for closure from the outset. The objectives and components of closure plans are also reviewed as the paper draws on case studies to highlight some of the possible constraints and challenges to pollution prevention that may be faced at the level of both public policy and corporate strategy. The article concludes by suggesting a forward-looking approach to integrated environmental management and viable future land-use planning based on a dynamic model for environmental management. (author)

  3. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  4. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2007-01-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  5. Transuranic Storage Area (TSA)-3 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Barry, G.A.; Lodman, D.L.; Spry, M.J.; Poor, K.J.

    1992-11-01

    This document describes the proposed plan for closure of the Transuranic Storage Area (TSA)-3 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. The unit will be closed by decontaminating structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  6. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  7. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  8. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  9. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  10. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Mathews, S.

    1997-04-01

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration of site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.

  11. The 300 area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1996-01-01

    The 300 Area Waste Acid Treatment System (WATS) is located within operable units 300-FF-2 (source) and 300-FF-5 (groundwater), as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) . Operable units 300-FF-2 and 300-FF-5 are scheduled to be remediated using the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) process. Thus, any remediation of the 300 Area WATS with respect to contaminants not produced by those facilities and soils and groundwater will be deferred to the CERCLA RI/FS process. Final closure activities will be completed in 3 phases and certified in accordance with the 300 Area WATS closure plan by the Washington State Department of Ecology (Ecology) and the U.S. Environmental Protection Agency (EPA). It is anticipated that the 300 Area WATS closure would take 2 years to complete

  12. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-05-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination.

  13. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination

  14. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.; Muska, C.F.; Boone, L.F.

    1988-03-01

    The closure plan for the M-Area settling basin and vicinity was originally submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) Bureau of Solid and Hazardous Waste Management in September 1984. The plan was revised in July and November 1985 in response to SCDHEC comments. After public comment in April through July 1986, the closure plan was conditionally approved by SCDHEC in March 1987. The conditions included (1) providing a temporary wastewater treatment facility to process the water remaining in the basin, (2) using a burn box to limit ash emissions from burning in the basin, (3) obtaining SCDHEC approval prior to operating the leach field, and (4) completing all closure activities within three years of the startup date

  15. 40 CFR 264.228 - Closure and post-closure care.

    Science.gov (United States)

    2010-07-01

    ... remaining wastes to a bearing capacity sufficient to support final cover; and (iii) Cover the surface....112 must include both a plan for complying with paragraph (a)(1) of this section and a contingent plan... practicably removed at closure; and (ii) The owner or operator must prepare a contingent post-closure plan...

  16. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed

  17. 2727-S Nonradioactive Dangerous Waste Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    Wilczek, T.A.; Laws, J.R.; Izatt, R.D.

    1992-01-01

    This closure plan describes the activities for final closure of the 2727-S Nonradioactive Dangerous Waste Storage (NRDWS) Facility at the Hanford Site. The 2727-S NRDWS Facility provided container storage for nonradioactive dangerous and extremely hazardous wastes generated in the research and development laboratories, process operations, and maintenance and transportation functions throughout the Hanford Site. Storage operations began at the 2727-S NRDWS Facility March 14, 1983, and continued until December 30, 1986, when the last shipment of materials from the facility took place. These storage operations have been moved to the new 616 NRDWS Facility, which is an interim status unit located between the 200 East and 200 West Areas of the Hanford Site

  18. 77 FR 60319 - Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a...

    Science.gov (United States)

    2012-10-03

    ...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...

  19. 303-K Radioactive Mixed-Waste Storage Facility closure plan

    International Nuclear Information System (INIS)

    1991-11-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors chemical-separation systems, and related facilities used for the production o special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 303-K Radioactive Mixed-Waste Storage Facility (303-K Facility) has been used since 1943 to store various radioactive,and dangerous process materials and wastes generated by the fuel manufacturing processes in the 300 Area. The mixed wastes are stored in US Department of Transportation (DOT)-specification containers (DOT 1988). The north end of the building was used for storage of containers of liquid waste and the outside storage areas were used for containers of solid waste. Because only the north end of the building was used, this plan does not include the southern end of the building. This closure plan presents a description of the facility, the history of materials and wastes managed, and a description of the procedures that will be followed to chose the 303-K Facility as a greater than 90-day storage facility. The strategy for closure of the 303-K Facility is presented in Chapter 6.0

  20. Hanford tanks initiative alternatives generation and analysis plan for AX tank farm closure basis

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    The purpose of this document is: (1) to review the HTI Mission Analysis and related documents to determine their suitability for use in developing performance measures for AX Tank Farm closure, (2) to determine the completeness and representativeness of selected alternative closure scenarios, (3) to determine the completeness of current plans for development of tank end-state criteria, and (4) to analyze the activities that are necessary and sufficient to recommend the end-state criteria and performance measures for the AX Tank Farm and recommend activities not currently planned to support establishment of its end-state criteria

  1. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  2. 300 Area Process Trenches Modified Closure/Postclosure Plan

    International Nuclear Information System (INIS)

    1997-09-01

    This chapter provides a brief summary of the contents of each chapter of this plan for the closure of the 300 Area Process Trenches (300 APT) treatment, storage, and/or disposal unit. It also provides background information for this unit and discusses how its closure will be integrated with the remedial action for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 300- FF-1 Operable Unit. The 300 APT is located within the 300 Area of the Hanford Site. This area contained reactor fuel fabrication facilities and research and development laboratories. The 300 APT was constructed and began operations in 1975 as the 316-5 Process Trenches. Effluent was discharged to the trenches by way of the 300 Area process sewer system, which has been the sole source of effluent for the 300 APT. The 316-5 Process Trenches gained Resource Conservation and Recovery Act of 1976 (RCRA) interim status as the 300 APT TSD unit on November 11, 1985. The unit has been administratively closed to discharges of dangerous waste since 1985

  3. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  4. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.

  5. Underground storage tank 431-D1U1, Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mancieri, S.

    1993-09-01

    This document contains information about the decommissioning of Tank 431-D1U1. This tank was installed in 1965 for diesel fuel storage. This tank will remain in active usage until closure procedures begin. Soils and ground water around the tank will be sampled to check for leakage. Appendices include; proof of proper training for workers, health and safety briefing record, task hazard analysis summary, and emergency plans.

  6. 303-K Storage Facility closure plan

    International Nuclear Information System (INIS)

    1993-01-01

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5

  7. 324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan

    International Nuclear Information System (INIS)

    Barnett, J.M.

    1998-01-01

    The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject closure unit. This closure plan is divided into nine chapters. Chapter 1.0 provides the introduction, historical perspective, 324 Building history and current mission, and the regulatory basis and strategy for managing the closure unit. Chapters 2.0, 3.0, 4.0, and 5.0 discuss the detailed facility description, process information, waste characteristics, and groundwater monitoring respectively. Chapter 6.0 deals with the closure strategy and performance standard, including the closure activities for the B-Cell, D-Cell, HLV, LLV; piping and miscellaneous associated building areas. Chapter 7.0 addresses the

  8. Analysis list: tra-1 [Chip-atlas[Archive

    Lifescience Database Archive (English)

    Full Text Available tra-1 Adult,Larvae + ce10 http://dbarchive.biosciencedbc.jp/kyushu-u/ce10/target/tr...a-1.1.tsv http://dbarchive.biosciencedbc.jp/kyushu-u/ce10/target/tra-1.5.tsv http://dbarchive.biosciencedbc....jp/kyushu-u/ce10/target/tra-1.10.tsv http://dbarchive.biosciencedbc.jp/kyushu-u/ce10/colo/tra-1.Adult.tsv,http://dbarchive.bioscience...dbc.jp/kyushu-u/ce10/colo/tra-1.Larvae.tsv http://dbarchive.bioscience...dbc.jp/kyushu-u/ce10/colo/Adult.gml,http://dbarchive.biosciencedbc.jp/kyushu-u/ce10/colo/Larvae.gml ...

  9. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.

    1985-07-01

    The areas addressed in this closure plan include a process sewer line, surface impoundment (settling basin), overflow ditch, seepage area, and a Carolina Bay known as Lost Lake. Since it is proposed that the basin and vicinity be closed with the hazardous wastes placed and stabilized in the basin, it will be closed pursuant to regulations for closing a hazardous waste landfill. No free liquids will remain in the impoundment after closure is completed

  10. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  11. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  12. Legionella dumoffii Tex-KL Mutated in an Operon Homologous to traC-traD is Defective in Epithelial Cell Invasion.

    Science.gov (United States)

    Qin, Tian; Ken-Ichiro, Iida; Ren, Hong Yu; Zhou, Hai Jian; Yoshida, Shin-Ichi

    2016-06-01

    To understand the mechanism of invasion by Legionella dumoffii. The L. dumoffii strain Tex-KL was mutated using the Tn903 derivative, Tn903dIIlacZ. After screening 799 transposon insertion mutants, we isolated one defective mutant. We then constructed the gene-disrupted mutant, KL16, and studied its invasion of and intracellular growth in HeLa and A549 cells, and in A/J mice survival experiments. The structure of traC-traD operon was analyzed by RT-PCR. The transposon insertion was in a gene homologous to Salmonella typhi traC, which is required for the assembly of F pilin into the mature F pilus structure and for conjugal DNA transmission. Results from RT-PCR suggested that the traC-traD region formed an operon. We found that when the traC gene was disrupted, invasion and intracellular growth of L. dumoffii Tex-KL were impaired in human epithelial cells. When mice were infected by intranasal inoculation with a traC deficient mutant, their survival significantly increased when compared to mice infected with the wild-type strain.. Our results indicated that the traC-traD operon is required for the invasion and intracellular growth abilities of L. dumoffii Tex-KL in epithelial cells. Copyright © 2016 The Editorial Board of Biomedical and Environmental Sciences. Published by China CDC. All rights reserved.

  13. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  14. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  15. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan

    International Nuclear Information System (INIS)

    1993-12-01

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites

  16. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  17. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  18. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    International Nuclear Information System (INIS)

    M.E. Davis

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards

  19. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    Energy Technology Data Exchange (ETDEWEB)

    M.E. Davis

    2007-05-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards.

  20. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  1. 105-DR Large Sodium Fire Facility closure activities evaluation report

    International Nuclear Information System (INIS)

    Adler, J.G.

    1996-01-01

    This report evaluates the closure activities at the 105-DR Large Sodium Fire Facility. The closure activities discussed include: the closure activities for the structures, equipment, soil, and gravel scrubber; decontamination methods; materials made available for recycling or reuse; and waste management. The evaluation compares these activities to the regulatory requirements and closure plan requirements. The report concludes that the areas identified in the closure plan can be clean closed

  2. 303-K Storage Facility closure plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  3. Resource Conservation and Recovery Act closure plan for the Intermediate-Level Transuranic Storage Facility mixed waste container storage units

    International Nuclear Information System (INIS)

    Nolte, E.P.; Spry, M.J.; Stanisich, S.N.

    1992-11-01

    This document describes the proposed plan for clean closure of the Intermediate-Level Transuranic Storage Facility mixed waste container storage units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. Descriptions of the location, size, capacity, history, and current status of the units are included. The units will be closed by removing waste containers in storage, and decontamination structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  4. Waste Dump Closure and Cost Estimates at AngloGold Ashanti ...

    African Journals Online (AJOL)

    Michael

    2017-12-02

    Dec 2, 2017 ... 2University of Mines and Technology, P.O. Box 237, Tarkwa, Ghana ... The mine has closure plans for the waste dumps and the closure activity ... incur additional cost, it was advised that the mine should execute the closure and reclamation plan without delay. .... Progressively rehabilitate the project area.

  5. Quorum-dependent transfer of the opine-catabolic plasmid pAoF64/95 is regulated by a novel mechanism involving inhibition of the TraR antiactivator TraM.

    Science.gov (United States)

    Wetzel, Margaret E; Asenstorfer, Robert E; Tate, Max E; Farrand, Stephen K

    2018-04-10

    We previously described a plasmid of Agrobacterium spp., pAoF64/95, in which the quorum-sensing system that controls conjugative transfer is induced by the opine mannopine. We also showed that the quorum-sensing regulators TraR, TraM, and TraI function similarly to their counterparts in other repABC plasmids. However, traR, unlike its counterpart on Ti plasmids, is monocistronic and not located in an operon that is inducible by the conjugative opine. Here, we report that both traR and traM are expressed constitutively and not regulated by growth with mannopine. We report two additional regulatory genes, mrtR and tmsP, that are involved in a novel mechanism of control of TraR activity. Both genes are located in the distantly linked region of pAoF64/95 encoding mannopine utilization. MrtR, in the absence of mannopine, represses the four-gene mocC operon as well as tmsP, which is the distal gene of the eight-gene motA operon. As judged by a bacterial two-hybrid analysis, TmsP, which shows amino acid sequence relatedness with the TraM-binding domain of TraR, interacts with the antiactivator. We propose a model in which mannopine, acting through the repressor MrtR, induces expression of TmsP which then titrates the levels of TraM thereby freeing TraR to activate the tra regulon. © 2018 The Authors. MicrobiologyOpen published by John Wiley & Sons Ltd.

  6. Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.

    Science.gov (United States)

    Ergene Şentürk, Didar; Alp, Emre

    2016-11-01

    Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.

  7. 105-DR Large Sodium Fire Facility closure plan

    International Nuclear Information System (INIS)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950's and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected

  8. 40 CFR 265.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...

  9. 40 CFR 264.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...

  10. Closure plan for the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units

    International Nuclear Information System (INIS)

    Smith, P.J.; Van Brunt, K.M.

    1992-11-01

    This document describes the proposed plan for closure of the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act interim status closure requirements. The location, size, capacity, and history of the units are described, and their current status is discussed. The units will be closed by treating remaining waste in storage, followed by thorough decontamination of the systems. Sufficient sampling and analysis, and documentation of all activities will be performed to demonstrate clean closure

  11. Planning for closures of hazardous waste land disposal units at the Oak Ridge Y-12 plant

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; DeLozier, M.F.P.; Manrod, W.E.

    1988-01-01

    Eight hazardous waste land disposal units at the Oak Ridge Y-12 Plant are being closed in accordance with the Resource Conservation and Recovery Act (RCRA) under an integrated multi-year program. The units, some of which date back to the early 1950s and include five surface impoundments, two landfills and a land treatment unit, have been used for the management of a variety of types of hazardous wastes. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. The units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. Closure of all eight units must be initiated by November 8, 1988. Funding for the eight closures is being provided by a new Department of Energy budget category, the environmental Restoration Budget Category (ERBC), which is intended to allow for a more rapid response to environmental problems and regulatory requirements. A major project, Closure and Post-Closure Activities (CAPCA) has been identified for ERBC funding to close the land disposal units in accordance with RCRA requirements. Establishing the project scope has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA project include risk assessments and the preparation of an integrated project schedule

  12. Engineering sustainable ecosystems: using GIS-based habitat modeling for oil sands mine reclamation and closure planning

    International Nuclear Information System (INIS)

    Seel, K.

    1997-01-01

    A GIS model was built to predict the climax vegetation habitat types on reclaimed mine surfaces in the Fort McMurray region of the Mid-Boreal Mixedwood Ecoregion of northwestern Alberta. Regional vegetation habitat types were classified by digital remote sensing using Landsat Thematic Mapper satellite data. Terrain data was derived from a high-resolution digital elevation model. The validated model was applied to the GIS database of Syncrude Canada's Mildred Lake Mine to predict future vegetation patterns based on the final closure mine surface. The results were compared to revegetation and closure plans created by experts to analyze performance and sustainability of reclamation efforts

  13. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  14. United Kingdom. Development plan for the eventual closure of the UK Drigg nuclear surface low level waste disposal facility

    International Nuclear Information System (INIS)

    2001-01-01

    The Drigg site, owned and operated by BNFL, is the UK's principal site for the disposal of low level radioactive waste. The site has operated since 1959 and receives wastes from a wide range of sources including nuclear power stations, nuclear fuel cycle facilities, isotope manufacturing sites, universities, general industry and cleanup of historically contaminated sites. Disposals until the late 1980s were solely by tipping essentially loose wastes into excavated trenches. More recently, trench disposals have been phased out in preference to emplacement of containerised, conditioned wastes in concrete vaults. The standardised wasteform consists of high force compacted (or non-compactable) waste immobilised within 20 m 3 steel overpack containers by the addition of cementitious grout. Larger items of wastes are grouted directly, in situ in the vault. The disposal trenches have been completed with an interim cap, as will the vaults when filled. It is currently estimated that sufficient capacity remains at Drigg for disposals to continue until at least 2050. Post-operations it is planned that the site will enter a phase including shut down of operational facilities, emplacement of long term site closure features including a final closure cap and then to an institutional management phase. Planning has therefore been carried out as to the strategy for eventual closure of the site. This closure strategy is also underpinned by an engineering evaluation studies programme to develop and evaluate appropriate closure measures including assessment of the long term performance of such measures. This appendix summarizes some of this work

  15. Jane Austen: tra brand e desiderio

    Directory of Open Access Journals (Sweden)

    Donata Meneghelli

    2014-12-01

    Full Text Available Che Jane Austen, dopo essere giunta a una incontrastata canonizzazione nel pantheon della letteratura occidentale, abbia recentemente intrapreso una   trionfante ascesa nell’ambito della cultura popolare è ormai “una verità universalmente riconosciuta”.   Il saggio analizza i modi, le forme, i supporti e i canali attraverso cui Jane Austen e i suoi testi narrativi (con particolare riferimento a Pride and Prejudice sono usciti dal cerchio tutto sommato ristretto dell’accademia, dei curricola universitari e dei lettori di professione, per entrare in uno spazio che è quello di YouTube, delle fan communities, della musica pop, dei blog, del romanzo rosa o dell’horror; i percorsi grazie ai quali sono diventati parte delle mitologie popolari del XXI secolo e al tempo stesso un brand di successo intorno al quale ruota una fitta rete di interessi economici (industria cinematografica e televisiva, turismo, editoria…, capace di catalizzare (e sfruttare desideri, proiezioni, aspettative di nuove tipologie di lettori; le inedite modalità di ricezione che caratterizzano questo fenomeno, e soprattutto la fan fiction, situata al punto di convergenza o di frizione tra diversi media (letteratura, cinema, televisione, web e media digitali in genere, tra produttori e consumatori, tra lettura e scrittura, tra strategie commerciali delle corporation e autarchia dei fan, tra “alto” e “basso”. Si tratta di un insieme di trasformazioni che scuote alle fondamenta le nostre consuetudini e le nostre credenze in quanto studiosi di letteratura: da una parte, emerge una nuova configurazione della testualità, euforica, rizomatica, molteplice, che si fa beffe di qualunque metafisica dell’originale e realizza in modo perverso alcune celebri utopie critiche; dall’altra, il caso Austen porta alla luce in maniera emblematica le contraddizioni latenti in qualunque processo di democratizzazione della cultura.

  16. Risk-Based Disposal Plan for PCB Paint in the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Canal

    Energy Technology Data Exchange (ETDEWEB)

    R. A. Montgomery

    2008-05-01

    This Toxic Substances Control Act Risk-Based Polychlorinated Biphenyl Disposal plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex, Idaho National Laboratory Site, to address painted surfaces in the empty canal under 40 CFR 761.62(c) for paint, and under 40 CFR 761.61(c) for PCBs that may have penetrated into the concrete. The canal walls and floor will be painted with two coats of contrasting non-PCB paint and labeled as PCB. The canal is covered with open decking; the access grate is locked shut and signed to indicate PCB contamination in the canal. Access to the canal will require facility manager permission. Protective equipment for personnel and equipment entering the canal will be required. Waste from the canal, generated during ultimate Decontamination and Decommissioning, shall be managed and disposed as PCB Bulk Product Waste.

  17. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    Bechtel Nevada

    2005-01-01

    This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site. This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site (NTS). The Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) are managed and operated by Bechtel Nevada (BN) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Integrated Closure and Monitoring Plan (ICMP) for these sites is based on guidance for developing closure plans issued by the DOE (DOE, 1999a). The plan does not closely follow the format suggested by the DOE guidance to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. Further, much of the information that would be included in the individual plans is the same, and integration provides efficient presentation. A cross-walk between the contents of the ICMP and the DOE guidance is given in Appendix A. Closure and monitoring were integrated because monitoring measures the degree to which the operational and closed disposal facilities are meeting performance objectives specified in the manual to DOE Order O 435.1. Department of Energy Order 435.1 governs management of radioactive waste, and associated with it are Manual DOE M 435.1-1 and Guidance DOE G 435.1-1. The performance objectives are intended to ensure protection of workers, the public, and the environment from radiological exposure associated with the RWMSs now and in the future

  18. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  19. State Environmental Policy Act (SEPA) Checklist for the 105-DR Large Sodium Fire Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950's and is located in the 100-D Area of the Hanford Site. The building housed the DR defense reactor, which was shut down in 1964. The LSFF is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Clean closure is the proposed method of closure for the LSFF. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989). This closure plan presents a description of the facility, the history of wastes managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  20. Comparing over-the-scope clip versus endoloop and clips (KING closure) for access site closure: a randomized experimental study

    Czech Academy of Sciences Publication Activity Database

    Martínek, J.; Ryska, O.; Tučková, I.; Filípková, T.; Doležel, R.; Juhás, Štefan; Motlík, Jan; Zavoral, M.; Ryska, M.

    2013-01-01

    Roč. 27, č. 4 (2013), s. 1203-1210 ISSN 0930-2794 R&D Projects: GA MZd NS9994 Institutional research plan: CEZ:AV0Z50450515 Keywords : NOTES * gastrotomy closure * rectotomy closure Subject RIV: FJ - Surgery incl. Transplants Impact factor: 3.313, year: 2013

  1. Considerations for closure of low-level radioactive waste engineered disposal facilities

    International Nuclear Information System (INIS)

    1992-01-01

    Proper stabilization and closure of low-level radioactive waste disposal facilities require detailed planning during the early stages of facility development. This report provides considerations for host States, compact regions, and unaffiliated States on stabilization and closure of engineered low-level radioactive waste and mixed waste disposal facilities. A time line for planning closure activities, which identifies closure considerations to be addressed during various stages of a facility's development, is presented. Current Federal regulatory requirements and guidance for closure and post-closure are outlined. Significant differences between host State and Federal closure requirements are identified. Design features used as stabilization measures that support closure, such as waste forms and containers, backfill materials, engineered barrier systems, and site drainage systems, are described. These design features are identified and evaluated in terms of how they promote long-term site stability by minimizing water infiltration, controlling subsidence and surface erosion, and deterring intrusion. Design and construction features critical to successful closure are presented for covers and site drainage. General considerations for stabilization and closure operations are introduced. The role of performance and environmental monitoring during closure is described

  2. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern

  3. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.

  4. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  5. 105-DR large sodium fire facility closure Plan. Revision 2

    International Nuclear Information System (INIS)

    Ruck, F.A. III.

    1995-03-01

    The 105-DR Large Sodium Fire Facility (LSFF), which was operated 1972-1986, was a research laboratory that occupied the former ventilation supply room on the SW side of the 105-DR Reactor Facility. (The 105-DR defense reactor was shut down in 1964.) LSFF was used to investigate fire and safety aspects of large sodium or other metal alkali fires in the LMFBR facilities; it was also used to store and treat alkali metal waste. This closure plan presents a description of the unit, the history of the waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of LSFF is expected. It is located within the 100-DR-2 (source) and 100-HR-3 (groundwater) operable units, which will be addressed through the RCRA facility investigation/corrective measures study process

  6. 105-DR Large Sodium Fire Facility closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950`s and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  7. I varchi della letteratura: tra scienza, follia e spiritualità

    Directory of Open Access Journals (Sweden)

    Stefano Redaelli

    2017-08-01

    Full Text Available Nel novecento italiano spiccano scrittori nella cui opera la letteratura si è aperta ad altre discipline, come la scienza, la psichiatria, la teologia. In questo articolo si descrive lo scambio tra saperi attraverso l’immagine dei varchi, portando l’esempio di Primo Levi (nel varco tra letteratura e scienza e Alda Merini (nel varco tra letteratura, follia, spiritualità. Se da una parte nella vita degli scrittori il varco è vissuto come spaccatura, dall’altra troviamo nella loro opera una fusione di saperi e linguaggi diversi, che concorrono a una rappresentazione più ampia della natura e dell’uomo.

  8. The Transit Monitoring in the South (TraMoS project

    Directory of Open Access Journals (Sweden)

    López-Morales Mercedes

    2013-04-01

    Full Text Available We present the Transit Monitoring in the South (TraMoS project. TraMoS has monitored transits of 30 exoplanets with telescopes located in Chile since 2008, whit the following goals: (1 to refine the physical and/or orbital parameters of those exoplanet system, and (2 to search for variations in the mid-times of the transits and in other parameters such as orbital inclination or transit's depth, that could indicate the presence of additional bodies in the system. We highlight here the first results of TraMoS in three selected exoplanets.

  9. Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit

    International Nuclear Information System (INIS)

    1996-05-01

    This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan

  10. Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1

    International Nuclear Information System (INIS)

    1998-07-01

    This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout

  11. Financial risks of post-closure custodial care for the Barnwell radioactive waste disposal facility - 16155

    International Nuclear Information System (INIS)

    Baird, Robert D.; Newberry, William F.

    2009-01-01

    This paper reports evaluations of the adequacy of the Barnwell Extended Care Fund in light of identified risks, with the conclusion that the fund is sufficient to cover the costs and uncertainties associated with planned post-closure care of the Barnwell, South Carolina low-level radioactive waste disposal facility. It reviews background information pertinent to the facility's post-closure monitoring and maintenance and describes financial responsibility for post-closure activities. It identifies and briefly characterizes the activities planned to be conducted following facility closure and presents the midrange estimate of planned post-closure costs. The paper identifies and quantifies sources of uncertainty in activities and costs planned for post-closure care and presents 50-, 80-, and 95-percent confidence levels of planned costs. The fund is currently sufficient to cover some but not all of the costs that might be incurred as a result of unplanned events. The paper identifies, characterizes, and quantifies unplanned events, possible consequences, and probabilities of occurrence. The paper presents costs that might be incurred in responding to the unplanned initiating events and identifies levels of confidence that the fund is adequate to cover such costs. (authors)

  12. INTEC CPP-603 Basin Water Treatment System Closure: Process Design

    Energy Technology Data Exchange (ETDEWEB)

    Kimmitt, Raymond Rodney; Faultersack, Wendell Gale; Foster, Jonathan Kay; Berry, Stephen Michael

    2002-09-01

    This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.

  13. I RAPPORTI TRA L'ALBANIA E LA GRAN BRETAGNA (1940-1950)

    OpenAIRE

    COTA, JULIAN

    2012-01-01

    La presente tesi ha avuto l’obiettivo di illustrare i rapporti tra l’Albania e la Gran Bretagna nel decennio tra il 1940 al 1950. Il lavoro viene svolto basandosi su tre momenti; a) l’ingresso dell’Albania nell’ottica della politica estera della Gran Bretagna e l’invio delle missioni militari britanniche in Albania. b) La fine della Guerra collocò l’Albania dall’altra parte della cortina di ferro rispetto ai britannici causando il peggioramento dei rapporti tra i due governi dopo gli...

  14. Cytotoxicity and radiosensitization effect of TRA-8 on radioresistant human larynx squamous carcinoma cells.

    Science.gov (United States)

    Wu, F; Hu, Y; Long, J; Zhou, Y J; Zhong, Y H; Liao, Z K; Liu, S Q; Zhou, F X; Zhou, Y F; Xie, C H

    2009-02-01

    TRAIL induces apoptosis in a variety of tumorigenic and transformed cell lines, but not in many normal cells. Recent studies have demonstrated that death receptor 5 (DR5), one of the two death receptors bound by TRAIL, showed expression in most malignantly transformed cells. This study evaluated effects of a monoclonal antibody (TRA-8) to human death receptor 5, combined with ionizing radiation, on radioresistant human larynx squamous carcinoma cell line (Hep-2R). Cells were treated with TRA-8 alone or in combination with radiation, cell viability inhibition was measured by MTT assay, and the induction of apoptosis was determined by Annexin V staining. Radionsensitivity of Hep-2R cells treated with TRA-8 were investigated with long-term clonogenic assays. Regulation of DR5 expression in cells after radiation was analyzed by indirect immunofluorescence using murine TRA-8 in combination with flow cytometry. The results suggested that TRA-8 enhanced radionsensitivity of Hep-2R cells, and that TRA-8 regulated Hep-2R cell cycle arrest at G2/M phase. Irradiation up-regulated the expression of DR5, and when combined with TRA-8 yielded optimal survival benefit. Therefore, TRA-8 can be used in combination with irradiation in radioresistant human larynx squamous carcinoma cells. Monoclonal antibodies such as TRA-8 may play an important role in the development of an effective treatment strategy for patients with radioresistant cancers.

  15. Sustainable closure of construction materials quarries in Cuba

    Directory of Open Access Journals (Sweden)

    Julio Montero-Matos

    2017-10-01

    Full Text Available The inclusion of effective mine closure plans in the exploitation project is the way to compensate for the harmful effect of this activity. Based on a diagnosis carried out in 11 sites in operation, belonging to the company Canteras, a methodology was designed with a systemic and integral approach that consists of five stages and allows the execution of quarry closures in a sustainable manner. The Delphi method was applied to select the criteria that directly affect the sustainable closure of quarries in such a way that it considers the essential postulates of the Cuban Economic Model (MEC. The proposed methodology represents a contribution to the planning and design of the mining closure in Cuban non-metallic deposits to guarantee the reduction of the environmental impacts caused during its operation and the reduction, to the lesser extent possible, of negative socio-economic effects for the workers and the community located in the area of influence of the quarries. Currently applied in the quarry of San José, in Mayabeque province.

  16. Guidance for closure of existing DOE LLW disposal sites

    International Nuclear Information System (INIS)

    Blanchfield, L.

    1987-01-01

    During FY 1986, a closure guidance document was developed. The purpose of this document is to provide guidance in support of DOE Order 5820.2 to site operating contractors for the stabilization and closure of existing low-level waste (LLW) shallow land disposal sites at US Department of Energy (DOE) facilities. Guidance is provided to aid operators in placing existing LLW sites in a closed conditions, i.e., a condition in which a nonoperational site meets postclosure performance requirements and can be shown, within a high degree of confidence, to perform as anticipated in the future, under the most cost-effective maintenance approach. Guidance is based on the philosophy that closure should be planned and performed using a systems approach. Plans for FY 1987 call for revision of the document to incorporate more information on closure of LLW sites also containing radioactive mixed waste and/or transuranic waste. 4 references, 3 figures, 2 tables

  17. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  18. Planning and management of uranium mine and mill closures. Proceedings of a technical committee meeting held in Liberec, Czech Republic, 3-6 May 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Technical Committee Meeting on Planning and Management of Uranium Mine and Mill Closures was held in Liberec, Czech Republic from 3 to 6 May 1994. A total of 30 participants from nine countries attended the meeting. Nineteen papers were presented. Most of these papers dealt with the concept of and experiences in planning for and the subsequent decommissioning and rehabilitation of uranium mines and mills in Australia, Canada, Czech Republic, Germany, Romania, Slovenia, Spain and the USA. Two papers discussed the government`s role and relevant regulations related to the closures, decommissioning and remediation of uranium production facilities. Of particular interest to the participants was a non-technical paper presented by the Mayor of the city of Andujar, Spain, describing the negative political and socio-economic impacts associated with closure and decommissioning of an uranium mine/mill facility. The highlights of the meeting were the field visits to the uranium production facilities and rehabilitation programme sites of DIAMO and WISMUT companies, located respectively in Straz, Czech Republic and Koenigstein, Germany. Refs, figs and tabs.

  19. Resource Conservation and Recovery Act Closure Plan for the Y-12 9409-5 Tank Storage Facility

    International Nuclear Information System (INIS)

    1995-02-01

    This document presents information on the closure of the Y-12 9409-5 Tank Storage Facility. Topics discussed include: facility description; closure history; closure performance standard; partial closure; maximum waste inventory; closure activities; schedule; and postclosure care

  20. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  1. ICT: interfacce tra persone e luoghi

    Directory of Open Access Journals (Sweden)

    Corinna Morandi

    2013-04-01

    Full Text Available Nonostante la diffusione del paradigma della smart city sia stata esponenziale, con l’effetto di confonderne il significato, il concetto di “città intelligente” indica comunque un tema di ricerca importante, in particolare quando venga esteso a contesti territoriali più ampi. In questo senso, la ricerca La smart region tra Torino e Milano. I servizi mobili come driver di innovazione territoriale in vista di Expo 2015 (Politecnico di Milano-Telecom Italia si propone di sperimentare l’uso delle ICT per un sistema integrato di servizi nel territorio tra Torino e Milano, anche in prospettiva di Expo 2015: una regione metropolitana valorizzata da un sistema di relazioni già attive e inserita nel contesto più ampio della city-region del Nord Italia, il cui sviluppo va legato ad una strategia di scala vasta, declinabile nella definizione di “smart city-region” o, più semplicemente, di “smart region”. In tale contesto, il ruolo delle università nei processi di sviluppo territoriale, il miglioramento dei servizi materiali e immateriali erogati dai campus, su cui la ricerca (in corso ha scelto di concentrarsi, può contribuire ad aumentare la sostenibilità e competitività del territorio. Una prima sperimentazione è stata condotta sull’area di Città Studi a Milano, testando una metodologia utile a comprenderne le esigenze e individuando soluzioni e servizi funzionanti su  terminali di comunicazione mobile, interfaccia tra persone e luoghi nel campus e nel contesto urbano circostante.

  2. Introducing the ARL X'Tra x-ray diffraction system

    International Nuclear Information System (INIS)

    Harris, L.

    2002-01-01

    Full text: The ARL X'Tra is a state-of-the-art solution for powder X-ray diffraction in a large range of applications such as pharmaceuticals and biosciences, chemicals, earth sciences, semi-conductors, metallurgy and ceramics. The X'Tra offers the latest technology in key diffraction components to produce a high performance instrument at an affordable price. This presentation examines some of the hardware and performance features of this instrument. Copyright (2002) Australian X-ray Analytical Association Inc

  3. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    Energy Technology Data Exchange (ETDEWEB)

    M.A. Ebadian, Ph.D.

    1999-01-01

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  4. Development of a prototype plan for the effective closure of a waste disposal site in Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    Nyhan, J.; Barnes, F.

    1989-02-01

    The purpose of this study was to develop a prototype plan for the effective closure and stabilization of a semiarid low-level waste disposal site. This prototype plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos based on previous shallow land burial (SLB) field research both at the Los Alamos Experimental Engineered Test Facility (EETF), and at a waste disposal area at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems at Waste Disposal Area B having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that one of the two models tested represented soil moisture more accurately than the second model. The accuracy of modeling all of the parameters of the water balance equation was then evaluated using field data from the Integrated Systems Demonstration plots at the EETF. Optimized parameters were developed for one model to describe observed values of deep percolation, evapotranspiration, and runoff from the field plots containing an SLB trench cap configuration

  5. Procedures and techniques for closure of near surface disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    2001-12-01

    The overall objective of this report is to provide Member States with guidance on planning and implementation of closure of near surface disposal facilities for low and intermediate level radioactive waste. The specific objectives are to review closure concepts, requirements, and components of closure systems; to discuss issues and approaches to closure, including regulatory, economic, and technical aspects; and to present major examples of closure techniques used and/or considered by Member States. Some examples of closure experience from Member States are presented in the Appendix and were indexed separately

  6. Closure of shallow underground injection wells

    International Nuclear Information System (INIS)

    Veil, J.A.; Grunewald, B.

    1993-01-01

    Shallow injection wells have long been used for disposing liquid wastes. Some of these wells have received hazardous or radioactive wastes. According to US Environmental Protection Agency (EPA) regulations, Class IV wells are those injection wells through which hazardous or radioactive wastes are injected into or above an underground source of drinking water (USDW). These wells must be closed. Generally Class V wells are injection wells through which fluids that do not contain hazardous or radioactive wastes are injected into or above a USDW. Class V wells that are responsible for violations of drinking water regulations or that pose a threat to human health must also be closed. Although EPA regulations require closure of certain types of shallow injection wells, they do not provide specific details on the closure process. This paper describes the regulatory background, DOE requirements, and the steps in a shallow injection well closure process: Identification of wells needing closure; monitoring and disposal of accumulated substances; filling and sealing of wells; and remediation. In addition, the paper describes a major national EPA shallow injection well enforcement initiative, including closure plan guidance for wells used to dispose of wastes from service station operations

  7. InTraCert. Inception report. The role of an integrated tradable green certificate system in a liberalising market

    International Nuclear Information System (INIS)

    Boots, M.G.; Schaeffer, G.J.; De Zoeten, C.; Mitchell, C.; Anderson, T.; Morthorst, P.E.; Nielsen, L.; Gual, M.; Del Rio, P.; Cadenas, A.; Hernandez, F.; Kuehn, I.; Braeur, W.; Stronzik, M.

    2000-12-01

    The InTraCert project aims to explore the possibility of integrating the existing and planned Tradable Green Certificate (TGC) schemes in the European Union and, therefore, creating a plausible unified market for TGCs. Particular attention will be paid to the possibilities of integrating TGCs for green electricity, heat and gas. Furthermore, it intents to examine the possible interactions arising from such a system with more direct GHG abatement measures, i.e. Carbon Emissions Trading (CET). The scope of the InTraCert project requires specific information for EU-15 countries regarding, on the one hand, Renewable Energy Sources (RES) used for electricity, gas and heat generation and. on the other, GHG emission levels and national strategies. In order to account for this information need. specific country inventories have been designed and carried out by InTraCert members in this first phase of the project. The inventory shows that Belgium, Italy, Denmark, the Netherlands, Austria, Sweden and the UK seriously want to implement a TGC system. The systems will indeed be nationally oriented; hardly any provisions for international trade in the different TGCs will be put in place. An essential prerequisite for efficient cross border trade is agreement on the carbon credit that comes with RE production. What is the size of the carbon credit and will this credit be attached to the TGC while traded? These will be the main questions to be answered in the next phase of the InTraCert project. 8 refs

  8. Fernald - Developing and Executing an Accelerated Closure Plan

    International Nuclear Information System (INIS)

    Nixon, D.A.

    2006-01-01

    In November 2000 the Department of Energy (DOE) and Fluor Fernald entered into a closure contract that incited Fluor Fernald to reduce the cost and schedule of the Fernald site cleanup. The contract established a target schedule and target cost and how Fluor Fernald performs against these targets determines the amount of fee the company earns. In response to these new challenges, Fluor Fernald developed a 13-part strategy to safely accelerate work and more efficiently utilize the available funding. Implementation of this strategy required a dramatic culture change at Fernald - from a 'government job mind set' to an entrepreneurial/commercial model. Fluor Fernald's strategy and culture change has proved to be successful as the company is on track to close the site ahead of the target schedule at a total project cost less than the target cost. The elements of Fluor Fernald's strategy and the lessons learned during implementation provide valuable information that could be utilized by other DOE sites that will be undergoing closure over the next decade. (authors)

  9. Biomechanics Strategies for Space Closure in Deep Overbite

    Directory of Open Access Journals (Sweden)

    Harryanto Wijaya

    2013-07-01

    Full Text Available Space closure is an interesting aspect of orthodontic treatment related to principles of biomechanics. It should be tailored individually based on patient’s diagnosis and treatment plan. Understanding the space closure biomechanics basis leads to achieve the desired treatment objective. Overbite deepening and losing posterior anchorage are the two most common unwanted side effects in space closure. Conventionally, correction of overbite must be done before space closure resulted in longer treatment. Application of proper space closure biomechanics strategies is necessary to achieve the desired treatment outcome. This cases report aimed to show the space closure biomechanics strategies that effectively control the overbite as well as posterior anchorage in deep overbite patients without increasing treatment time. Two patients who presented with class II division 1 malocclusion were treated with fixed orthodontic appliance. The primary strategies included extraction space closure on segmented arch that employed two-step space closure, namely single canine retraction simultaneously with incisors intrusion followed by enmasse retraction of four incisors by using differential moment concept. These strategies successfully closed the space, corrected deep overbite and controlled posterior anchorage simultaneously so that the treatment time was shortened. Biomechanics strategies that utilized were effective to achieve the desired treatment outcome.

  10. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-11-01

    The Bear Creek Burial Grounds (BCBG) are located on the southwest flank of Pine Ridge ∼1.5 miles west of the Oak Ridge Y-12 Plant in Bear Creek Valley. This facility consists of several contiguous disposal sites identified as Burial Grounds A, B, C, and D. Each burial site consists of a series of trenches used for disposal of solid wastes and, in some cases, liquid wastes. Initially, the RCRA Closure/Postclosure plan for the BCBG was intended to apply to A Area, C-West, B Area, and the walk-in pits for BCBG. However, a plan was provided to include the B Area in the walk-in pits so that both areas cold be closed under one cap. The closure plan for B Area and the walk-in pits is presented in this document. The actual quantity and identity of materials is uncertain. The largest volume of material disposed in BCBG consists of uranium-contaminated industrial trash (paper, wood, steel, glass, and rubble)

  11. Study on a monitoring strategy to support decision making for geological repository closure

    International Nuclear Information System (INIS)

    Suyama, Yasuhiro; Tanabe, Hiromi; Eto, Jiro; Yoshimura, Kimitaka

    2010-01-01

    Japan currently plans to dispose of high-level radioactive wastes (vitrified HLWs) produced from the reprocessing of spent nuclear fuel in deep geological formations, in order to isolate the radioactive wastes from the human environment for tens of thousands of years. Such a geological repository must be designed to ensure operational safety and post-closure safety. Then, following the closure of the geological repository, post-closure safety will be provided by an engineered barrier system (EBS) and a natural barrier system (NBS) without relying on monitoring or institutional control. However, from a technical standpoint, monitoring has been required during backfilling in current studies. Additionally, there has been strong social pressure to continue monitoring during all the phases including post-closure. On the basis of the current situations, a monitoring strategy for geological disposal must be studied to ensure the long term safety of geological disposal. Focusing on decision making for geological repository closure, the authors have created a basic logical structure for the decision making process with the principles for ensuring safety and have developed a monitoring strategy based on the logical structure. The monitoring strategy is founded on three key aspects: the role of monitoring, boundary conditions of monitoring at the time of decision making, and a methodology for monitoring planning. Then, the monitoring strategy becomes a starting point of monitoring planning during site characterization, construction, operation and staged closure, as well as post-closure with institutional control, and of social science studies. (author)

  12. Giocare, tra violenza ed ecologia della mente.

    Directory of Open Access Journals (Sweden)

    Enrico Euli

    2008-07-01

    Full Text Available L'articolo riflette sulle relazioni tra comunicazione, violenza e gioco, nel tentativo di rintracciare tra loro convergenze, affinità e contrasti. Le nostre relazioni, infatti, ci immettono inerzialmente in dilemmi e paradossi di così alta complessità da rendere spesso inadeguati gli strumenti 'logici' ed 'analitici': dal che può derivare un senso di impotenza, rabbia, paralisi, ma anche un desiderio potente di controllo e di soluzione degli eventi. Entrambe queste strade ci conducono dentro le false alternative della violenza. La cultura del gioco, invece, ci propone (attraverso le sue pratiche, ma anche negli scritti teorici di Freud, Winnicott, Bateson, qui riassunti e rivisitati una modalità più creativa e nonviolenta, più prossima ad un' ecologia della mente e ad un'estetica delle emozioni.

  13. Validation of the dermal exposure model in ECETOC TRA.

    Science.gov (United States)

    Marquart, Hans; Franken, Remy; Goede, Henk; Fransman, Wouter; Schinkel, Jody

    2017-08-01

    The ECETOC TRA model (presently version 3.1) is often used to estimate worker inhalation and dermal exposure in regulatory risk assessment. The dermal model in ECETOC TRA has not yet been validated by comparison with independent measured exposure levels. This was the goal of the present study. Measured exposure levels and relevant contextual information were gathered via literature search, websites of relevant occupational health institutes and direct requests for data to industry. Exposure data were clustered in so-called exposure cases, which are sets of data from one data source that are expected to have the same values for input parameters in the ECETOC TRA dermal exposure model. For each exposure case, the 75th percentile of measured values was calculated, because the model intends to estimate these values. The input values for the parameters in ECETOC TRA were assigned by an expert elicitation and consensus building process, based on descriptions of relevant contextual information.From more than 35 data sources, 106 useful exposure cases were derived, that were used for direct comparison with the model estimates. The exposure cases covered a large part of the ECETOC TRA dermal exposure model. The model explained 37% of the variance in the 75th percentiles of measured values. In around 80% of the exposure cases, the model estimate was higher than the 75th percentile of measured values. In the remaining exposure cases, the model estimate may not be sufficiently conservative.The model was shown to have a clear bias towards (severe) overestimation of dermal exposure at low measured exposure values, while all cases of apparent underestimation by the ECETOC TRA dermal exposure model occurred at high measured exposure values. This can be partly explained by a built-in bias in the effect of concentration of substance in product used, duration of exposure and the use of protective gloves in the model. The effect of protective gloves was calculated to be on average a

  14. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  15. Expression of Tra2β in Cancer Cells as a Potential Contributory Factor to Neoplasia and Metastasis

    Directory of Open Access Journals (Sweden)

    Andrew Best

    2013-01-01

    Full Text Available The splicing regulator proteins SRSF1 (also known as ASF/SF2 and SRSF3 (also known as SRP20 belong to the SR family of proteins and can be upregulated in cancer. The SRSF1 gene itself is amplified in some cancer cells, and cancer-associated changes in the expression of MYC also increase SRSF1 gene expression. Increased concentrations of SRSF1 protein promote prooncogenic splicing patterns of a number of key regulators of cell growth. Here, we review the evidence that upregulation of the SR-related Tra2β protein might have a similar role in cancer cells. The TRA2B gene encoding Tra2β is amplified in particular tumours including those of the lung, ovary, cervix, stomach, head, and neck. Both TRA2B RNA and Tra2β protein levels are upregulated in breast, cervical, ovarian, and colon cancer, and Tra2β expression is associated with cancer cell survival. The TRA2B gene is a transcriptional target of the protooncogene ETS-1 which might cause higher levels of expression in some cancer cells which express this transcription factor. Known Tra2β splicing targets have important roles in cancer cells, where they affect metastasis, proliferation, and cell survival. Tra2β protein is also known to interact directly with the RBMY protein which is implicated in liver cancer.

  16. Closure of hazardous and mixed radioactive waste management units at DOE facilities

    International Nuclear Information System (INIS)

    1990-06-01

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA

  17. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  18. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973 to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.

  19. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 115: AREA 25 TEST CELL A FACILITY, NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    2006-01-01

    This Closure Report (CR) describes the activities performed to close CAU 115, Area 25 Test Cell A Facility, as presented in the NDEP-approved SAFER Plan (NNSA/NSO, 2004). The SAFER Plan includes a summary of the site history, process knowledge, and closure standards. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical and radiological data to confirm that the remediation goals were met and to document final site conditions. The approved closure alternative as presented in the SAFER Plan for CAU 115 (NNSA/NSO, 2004) was clean closure; however, closure in place was implemented under a Record of Technical Change (ROTC) to the SAFER Plan when radiological surveys indicated that the concrete reactor pad was radiologically activated and could not be decontaminated to meet free release levels. The ROTC is included as Appendix G of this report. The objectives of closure were to remove any trapped residual liquids and gases, dispose regulated and hazardous waste, decontaminate removable radiological contamination, demolish and dispose aboveground structures, remove the dewar as a best management practice (BMP), and characterize and restrict access to all remaining radiological contamination. Radiological contaminants of concern (COCs) included cobalt-60, cesium-137, strontium-90, uranium-234/235/236/238, and plutonium-239/240. Additional COCs included Resource Conservation and Recovery Act (RCRA) metals, polychlorinated biphenyls (PCBs), and asbestos

  20. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0

    International Nuclear Information System (INIS)

    Olson, A.L.; Nacht, S.J.

    1997-11-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D ampersand D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities

  1. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    Olson, A.L.; Nacht, S.J.

    1997-11-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

  2. Estimating the costs of school closure for mitigating an influenza pandemic

    Directory of Open Access Journals (Sweden)

    Adams Elisabeth J

    2008-04-01

    Full Text Available Abstract Background School closure is a key component of many countries' plans to mitigate the effect of an influenza pandemic. Although a number of studies have suggested that such a policy might reduce the incidence, there are no published studies of the cost of such policies. This study attempts to fill this knowledge gap Methods School closure is expected to lead to significant work absenteeism of working parents who are likely to be the main care givers to their dependent children at home. The cost of absenteeism due to school closure is calculated as the paid productivity loss of parental absenteeism during the period of school closure. The cost is estimated from societal perspective using a nationally representative survey. Results The results show that overall about 16% of the workforce is likely to be the main caregiver for dependent children and therefore likely to take absenteeism. This rises to 30% in the health and social care sector, as a large proportion of the workforce are women. The estimated costs of school closure are significant, at £0.2 bn – £1.2 bn per week. School closure is likely to significantly exacerbate the pressures on the health system through staff absenteeism. Conclusion The estimates of school closure associated absenteeism and the projected cost would be useful for pandemic planning for business continuity, and for cost effectiveness evaluation of different pandemic influenza mitigation strategies.

  3. Underground storage tank 291-D1U1: Closure plan

    Energy Technology Data Exchange (ETDEWEB)

    Mancieri, S.; Giuntoli, N.

    1993-09-01

    The 291-D1U1 tank system was installed in 1983 on the north side of Building 291. It supplies diesel fuel to the Building 291 emergency generator and air compressor. The emergency generator and air compressor are located southwest and southeast, respectively, of the tank (see Appendix B, Figure 2). The tank system consists of a single-walled, 2,000- gallon, fiberglass tank and a fuel pump system, fill pipe, vent pipe, electrical conduit, and fuel supply and return piping. The area to be excavated is paved with asphalt and concrete. It is not known whether a concrete anchor pad is associated with this tank. Additionally, this closure plan assumes that the diesel tank is below the fill pad. The emergency generator and air compressor for Building 291 and its associated UST, 291-D1U1, are currently in use. The generator and air compressor will be supplied by a temporary above-ground fuel tank prior to the removal of 291-D1U1. An above-ground fuel tank will be installed as a permanent replacement for 291-D1U1. The system was registered with the State Water Resources Control Board on June 27, 1984, as 291-41D and has subsequently been renamed 291-D1U1. Figure 1 (see Appendix B) shows the location of the 291-D1U1 tank system in relation to the Lawrence Livermore National Laboratory (LLNL). Figure 2 (see Appendix B) shows the 291-D1U1 tank system in relation to Building 291. Figure 3 (see Appendix B) shows a plan view of the 291-D1U1 tank system.

  4. Final Report of the NASA Technology Readiness Assessment (TRA) Study Team

    Science.gov (United States)

    Hirshorn, Steven; Jefferies, Sharon

    2016-01-01

    The material in this report covers the results on the NASA-wide TRA team, who are responsible for ascertaining the full extent of issues and ambiguities pertaining to TRATRL and to provide recommendations for mitigation. The team worked for approximately 6 months to become knowledgeable on the current TRATRL process and guidance and to derive recommendations for improvement.The team reviewed the TRA processes of other government agencies (OGA), including international agencies, and found that while the high-level processes are similar, the NASA process has a greater level of detail. Finally, NASA’s HQ OCT continues to monitor the GAO’s efforts to produce a TRA Best Practices Guide, a draft of which was received in February 2016. This Guide could impact the recommendations of this report.

  5. Crystal structures of the F and pSLT plasmid TraJ N-terminal regions reveal similar homodimeric PAS folds with functional interchangeability

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Jun; Wu, Ruiying; Adkins, Joshua N.; Joachimiak, Andrzej; Glover, Mark

    2014-09-16

    In the F-family of conjugative plasmids, TraJ is an essential transcriptional activator of the tra operon that encodes most of the proteins required for conjugation. Here we report for the first time the X-ray crystal structures of the TraJ N-terminal regions from the prototypic F plasmid (TraJF11-130) and from the Salmonella virulence plasmid pSLT (TraJpSLT 1-128). Both proteins form similar homodimeric Per-ARNT-Sim (PAS) fold structures. Mutational analysis reveals that the observed dimeric interface is critical for TraJF transcriptional activation, indicating that dimerization of TraJ is required for its in vivo function. An artificial ligand (oxidized dithiothreitol) occupies a cavity in the TraJF dimer interface, while a smaller cavity in corresponding region of the TraJpSLT structure lacks a ligand. Gas chromatography/mass spectrometry-electron ionization analysis of dithiothreitol-free TraJF suggests indole may be the natural TraJ ligand; however, disruption of the indole biosynthetic pathway does not affect TraJF function. Heterologous PAS domains from pSLT and R100 TraJ can functionally replace the TraJF PAS domain, suggesting that TraJ allelic specificity is mediated by the region C-terminal to the PAS domain.

  6. Single loop-and-clips technique (KING closure) for gastrotomy closure after transgastric ovariectomy: a survival experiment

    Czech Academy of Sciences Publication Activity Database

    Ryska, O.; Martinek, J.; Filípková, T.; Doležel, R.; Juhásová, Jana; Motlík, Jan; Zavoral, M.; Ryska, M.

    2012-01-01

    Roč. 7, č. 4 (2012), s. 233-239 ISSN 1895-4588 R&D Projects: GA MZd NS9994 Institutional research plan: CEZ:AV0Z50450515 Keywords : natural orifice transluminal endoscopic surgery * gastric closure * clips * endoloop Subject RIV: FJ - Surgery incl. Transplants Impact factor: 0.757, year: 2012

  7. Identification of evolutionarily conserved exons as regulated targets for the splicing activator tra2β in development.

    Directory of Open Access Journals (Sweden)

    Sushma Grellscheid

    2011-12-01

    Full Text Available Alternative splicing amplifies the information content of the genome, creating multiple mRNA isoforms from single genes. The evolutionarily conserved splicing activator Tra2β (Sfrs10 is essential for mouse embryogenesis and implicated in spermatogenesis. Here we find that Tra2β is up-regulated as the mitotic stem cell containing population of male germ cells differentiate into meiotic and post-meiotic cells. Using CLIP coupled to deep sequencing, we found that Tra2β binds a high frequency of exons and identified specific G/A rich motifs as frequent targets. Significantly, for the first time we have analysed the splicing effect of Sfrs10 depletion in vivo by generating a conditional neuronal-specific Sfrs10 knock-out mouse (Sfrs10(fl/fl; Nestin-Cre(tg/+. This mouse has defects in brain development and allowed correlation of genuine physiologically Tra2β regulated exons. These belonged to a novel class which were longer than average size and importantly needed multiple cooperative Tra2β binding sites for efficient splicing activation, thus explaining the observed splicing defects in the knockout mice. Regulated exons included a cassette exon which produces a meiotic isoform of the Nasp histone chaperone that helps monitor DNA double-strand breaks. We also found a previously uncharacterised poison exon identifying a new pathway of feedback control between vertebrate Tra2 proteins. Both Nasp-T and the Tra2a poison exon are evolutionarily conserved, suggesting they might control fundamental developmental processes. Tra2β protein isoforms lacking the RRM were able to activate specific target exons indicating an additional functional role as a splicing co-activator. Significantly the N-terminal RS1 domain conserved between flies and humans was essential for the splicing activator function of Tra2β. Versions of Tra2β lacking this N-terminal RS1 domain potently repressed the same target exons activated by full-length Tra2β protein.

  8. Development of the SyncTraX FX4 version real-time tumor tracking system for radiation therapy

    International Nuclear Information System (INIS)

    Ishiyama, Tomoharu; Torigoe, Yui; Nagae, Koudai; Kajiki, Shunsuke; Sano, Takayuki

    2017-01-01

    Based on the current SyncTraX that was developed jointly with Hokkaido University, we have developed the SyncTraX FX4 version, which features not only tumor tracking but also patient positioning. The SyncTraX FX4 version is configured with four fixed x-ray tubes an detectors and eliminated the rail that is used to move the x-ray tube and detector as in the current SyncTraX. This development simplifies limitations on facility construction. We also adopted a distortion free flat panel detector instead of a color I.I., and the additional patient positioning feature will enable the SyncTraX FX4 version to become more widely applied in clinical cases. (author)

  9. 2101-M pond closure plan

    International Nuclear Information System (INIS)

    1993-06-01

    This document describes activities for the closure of a surface impoundment (2101-M Pond) at the Hanford Site. The 2101-H Pond was initially constructed in 1953 to serve as a drainage collection area for the 2101-H Building. (Until the Basalt Waste Isolation Project (BWIP) Laboratory was constructed in the 2101-M Building in 1979--1981, the only source contributing discharge to the pond was condensate water from the 2101-H Building heating, ventilation, and air conditioning (HVAC) system. The drains for the BWIP Laboratory rooms were plumbed into a 4-in., cast-iron, low-pressure drain pipe that carries waste water from the HVAC system to the pond. During the active life of the BWIP Laboratory, solutions of dissolved barium in groundwater samples were discharged to the 2101-M Pond via the laboratory drains. As a result of the discharges, a Part A permit application was initially submitted to the Washington State Department of Ecology (Ecology) in August 1986 which designates the 2101-M Pond as a surface impoundment

  10. Closure certification report: TA-35 TSL-125 surface impoundment

    International Nuclear Information System (INIS)

    1991-01-01

    This closure report documents closure activities for the TA-35 TSL-125 surface impoundment and associated structures at Los Alamos National Laboratory (the Laboratory). Prior to formal approval of the closure plan, the decision was made to proceed with closure activities to prevent any further releases from the site following informal discussions with New Mexico Environment Department (NMED) personnel. The closure plan is a revision of the previously submitted draft dated July 1988. Clean closure of the TSL-125 site was accomplished through: Removal and proper disposal of all wastes contained within the surface impoundment system; Decontamination and/or removal and proper disposal of the surface impoundment, its associated structures, and contaminated soil underlying the impoundment area; Sampling and analysis of soil to determine the presence and concentrations of any hazardous constituents remaining in the soil at the TSL-125 site; and Demonstration through a risk assessment that any constituents remaining in the soil at the TSL-125 site pose no threat to human health and the environment. All remaining soil concentrations of hazardous constituents were below health-based action levels. Analytical results indicated that benzidine, n-nitrosodimethylamine, and n-nitrosodi-n-propylamine were not detected at or above their limits of quantitation and beryllium was not present at or above its laboratory detection limit. However, the limits of quantitation and detection for these constituents were greater than their calculated health-based action levels. To demonstrate that these constituents were not present, historical data was researched and it was determined that the constituents were not utilized at the Building 125 site. 4 refs., 8 figs., 1 tab

  11. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Mark Burmeister

    2007-01-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met as specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs)

  12. Planning for closure and deactivation of the EBR-II complex

    International Nuclear Information System (INIS)

    Michelbacher, J.A.; Henslee, S.P.; Poland, H.F.; Wells, P.B.

    1997-01-01

    In January 1994, DOE terminated the Integral Fast Reactor (IFR) Program. Argonne National Laboratory-West (ANL-W) prepared a detailed plan to put Experimental Breeder Reactor-II (EBR-II) in a safe condition, including removal of irradiated fueled subassemblies from the plant, transfer of subassemblies, and removal and stabilization of primary and secondary sodium liquid heat transfer metal. The goal of deactivation is to stabilize the EBR-II complex until decontamination and decommissioning (D ampersand D) is implemented, thereby minimizing maintenance and surveillance. Deactivation of a sodium cooled reactor presents unique concerns. Residual sodium in the primary and secondary systems must be either reacted or inerted to preclude concerns with explosive sodium-air reactions. Also, residual sodium on components will effectively solder these items in place, making removal unfeasible. Several special cases reside in the primary system, including primary cold traps, a cesium trap, a cover gas condenser, and systems containing sodium-potassium alloy. The sodium or sodium-potassium alloy in these components must be reacted in place or the components removed. The Sodium Components Maintenance Shop at ANL-W provides the capability for washing primary components, removing residual quantities of sodium while providing some decontamination capacity. Considerations need to be given to component removal necessary for providing access to primary tank internals for D ampersand D activities, removal of hazardous materials, and removal of stored energy sources. ANL-W's plan for the deactivation of EBR-II addresses these issues, providing for an industrially and radiologically safe complex, requiring minimal surveillance during the interim period between deactivation and D ampersand D. Throughout the deactivation and closure of the EBR-II complex, federal environmental concerns will be addressed, including obtaining the proper permits for facility condition and waste processing

  13. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  14. Shuttle Planning for Link Closures in Urban Public Transport Networks

    NARCIS (Netherlands)

    van der Hurk, E.; Koutsopoulos, H.; Wilson, N.H.M.; Kroon, L.G.; Maroti, G.

    2016-01-01

    Urban public transport systems must periodically close certain links for maintenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the closed links with a simple shuttle service. However, alternative shuttle

  15. Suction Cup Induced Palatal Fistula: Surgical Closure by Palatal ...

    African Journals Online (AJOL)

    1Department of Pediatrics, Pragna Children's Hospital, Hyderabad, ... Eluru, 4Department of Conservative Dentistry and Endodontics, KIMS Dental College and ... The surgical closure of palatal fistula planned under general anesthesia.

  16. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan

    International Nuclear Information System (INIS)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5

  17. Household responses to school closure resulting from outbreak of influenza B, North Carolina.

    Science.gov (United States)

    Johnson, April J; Moore, Zack S; Edelson, Paul J; Kinnane, Lynda; Davies, Megan; Shay, David K; Balish, Amanda; McCarron, Meg; Blanton, Lenee; Finelli, Lyn; Averhoff, Francisco; Bresee, Joseph; Engel, Jeffrey; Fiore, Anthony

    2008-07-01

    School closure is a proposed strategy for reducing influenza transmission during a pandemic. Few studies have assessed how families respond to closures, or whether other interactions during closure could reduce this strategy's effect. Questionnaires were administered to 220 households (438 adults and 355 children) with school-age children in a North Carolina county during an influenza B virus outbreak that resulted in school closure. Closure was considered appropriate by 201 (91%) households. No adults missed work to solely provide childcare, and only 22 (10%) households required special childcare arrangements; 2 households incurred additional costs. Eighty-nine percent of children visited at least 1 public location during the closure despite county recommendations to avoid large gatherings. Although behavior and attitudes might differ during a pandemic, these results suggest short-term closure did not cause substantial hardship for parents. Pandemic planning guidance should address the potential for transmission in public areas during school closure.

  18. Utility of the theory of reasoned action and theory of planned behavior for predicting Chinese adolescent smoking.

    Science.gov (United States)

    Guo, Qian; Johnson, C Anderson; Unger, Jennifer B; Lee, Liming; Xie, Bin; Chou, Chih-Ping; Palmer, Paula H; Sun, Ping; Gallaher, Peggy; Pentz, MaryAnn

    2007-05-01

    One third of smokers worldwide live in China. Identifying predictors of smoking is important for prevention program development. This study explored whether the Theory of Reasoned Action (TRA) and Theory of Planned Behavior (TPB) predict adolescent smoking in China. Data were obtained from 14,434 middle and high school students (48.6% boys, 51.4% girls) in seven geographically varied cities in China. TRA and TPB were tested by multilevel mediation modeling, and compared by multilevel analyses and likelihood ratio tests. Perceived behavioral control was tested as a main effect in TPB and a moderation effect in TRA. The mediation effects of smoking intention were supported in both models (p<0.001). TPB accounted for significantly more variance than TRA (p<0.001). Perceived behavioral control significantly interacted with attitudes and social norms in TRA (p<0.001). Therefore, TRA and TPB are applicable to China to predict adolescent smoking. TPB is superior to TRA for the prediction and TRA can better predict smoking among students with lower than higher perceived behavioral control.

  19. Geografia e sport: per una definizione del rapporto tra spazio e società

    Directory of Open Access Journals (Sweden)

    Rosario De Iulio

    2013-04-01

    Full Text Available Le finalità del presente saggio si possono sintetizzare in due differenti punti, ma strettamente legati tra di loro. Il primo è quello di illustrare, seppur brevemente, l’insieme delle teorie che hanno portato all’origine e alla affermazione della geografia dello sport, mentre il secondo cercherà di tracciare seppur a grandi linee, le emergenti linee di ricerca nell’ottica del complesso rapporto tra spazio e società. In tal modo si offriranno alcuni spunti di riflessione e nuove chiavi di lettura sul poliedrica relazione tra attività sportiva, intesa come fenomeno socio-culturale, e spazio/territorio, ormai sempre più centrale nelle più recenti politiche di pianificazione territoriale, considerando anche dell’attuale fase di deindustrializzazione che investe i nostri centri urbani.

  20. Systematic genetic array analysis links the Saccharomyces cerevisiae SAGA/SLIK and NuA4 component Tra1 to multiple cellular processes

    Directory of Open Access Journals (Sweden)

    Andrews Brenda

    2008-07-01

    Full Text Available Abstract Background Tra1 is an essential 437-kDa component of the Saccharomyces cerevisiae SAGA/SLIK and NuA4 histone acetyltransferase complexes. It is a member of a group of key signaling molecules that share a carboxyl-terminal domain related to phosphatidylinositol-3-kinase but unlike many family members, it lacks kinase activity. To identify genetic interactions for TRA1 and provide insight into its function we have performed a systematic genetic array analysis (SGA on tra1SRR3413, an allele that is defective in transcriptional regulation. Results The SGA analysis revealed 114 synthetic slow growth/lethal (SSL interactions for tra1SRR3413. The interacting genes are involved in a range of cellular processes including gene expression, mitochondrial function, and membrane sorting/protein trafficking. In addition many of the genes have roles in the cellular response to stress. A hierarchal cluster analysis revealed that the pattern of SSL interactions for tra1SRR3413 most closely resembles deletions of a group of regulatory GTPases required for membrane sorting/protein trafficking. Consistent with a role for Tra1 in cellular stress, the tra1SRR3413 strain was sensitive to rapamycin. In addition, calcofluor white sensitivity of the strain was enhanced by the protein kinase inhibitor staurosporine, a phenotype shared with the Ada components of the SAGA/SLIK complex. Through analysis of a GFP-Tra1 fusion we show that Tra1 is principally localized to the nucleus. Conclusion We have demonstrated a genetic association of Tra1 with nuclear, mitochondrial and membrane processes. The identity of the SSL genes also connects Tra1 with cellular stress, a result confirmed by the sensitivity of the tra1SRR3413 strain to a variety of stress conditions. Based upon the nuclear localization of GFP-Tra1 and the finding that deletion of the Ada components of the SAGA complex result in similar phenotypes as tra1SRR3413, we suggest that the effects of tra1SRR3413

  1. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    International Nuclear Information System (INIS)

    Strachan, C.L.; Raabe, K.L.

    1997-01-01

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designed for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment

  2. CRITICAL ASSUMPTIONS IN THE F-TANK FARM CLOSURE OPERATIONAL DOCUMENTATION REGARDING WASTE TANK INTERNAL CONFIGURATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Hommel, S.; Fountain, D.

    2012-03-28

    The intent of this document is to provide clarification of critical assumptions regarding the internal configurations of liquid waste tanks at operational closure, with respect to F-Tank Farm (FTF) closure documentation. For the purposes of this document, FTF closure documentation includes: (1) Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the FTF PA) (SRS-REG-2007-00002), (2) Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site (DOE/SRS-WD-2012-001), (3) Tier 1 Closure Plan for the F-Area Waste Tank Systems at the Savannah River Site (SRR-CWDA-2010-00147), (4) F-Tank Farm Tanks 18 and 19 DOE Manual 435.1-1 Tier 2 Closure Plan Savannah River Site (SRR-CWDA-2011-00015), (5) Industrial Wastewater Closure Module for the Liquid Waste Tanks 18 and 19 (SRRCWDA-2010-00003), and (6) Tank 18/Tank 19 Special Analysis for the Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the Tank 18/Tank 19 Special Analysis) (SRR-CWDA-2010-00124). Note that the first three FTF closure documents listed apply to the entire FTF, whereas the last three FTF closure documents listed are specific to Tanks 18 and 19. These two waste tanks are expected to be the first two tanks to be grouted and operationally closed under the current suite of FTF closure documents and many of the assumptions and approaches that apply to these two tanks are also applicable to the other FTF waste tanks and operational closure processes.

  3. Rating the Effectiveness of Fishery Closures With Visible Infrared Imaging Radiometer Suite Boat Detection Data

    Directory of Open Access Journals (Sweden)

    Christopher D. Elvidge

    2018-04-01

    Full Text Available Fishery closures are widely used to promote the sustainability of fish stocks. Fishery agencies typically have very little data relevant to planning closure enforcement actions and evaluating the effectiveness of closures, due in part to the vast expanse and remote nature of many closures. In some cases the effectiveness of closures can be evaluated using data from GPS based beacons, such as Automatic Identification System (AIS or Vessel Monitoring Systems (VMS installed on fishing boats. In fisheries where few boats are equipped with AIS or VMS, the rating of closures relies on other data sources capable of detecting or inferring fishing activity. One such source comes from low light imaging data collected by the NASA/NOAA Visible Infrared Imaging Radiometer Suite (VIIRS, which can detect fishing boats using lights to attract catch. This is a widely used practice in Asia and several other regions. NOAA has developed an automatic system for reporting the locations of VIIRS boat detections with a nominal 4 h temporal latency. VIIRS boat detection alerts are running for more than 900 fishery closures in the Philippines, with email and SMS transmission modes. These alerts are being actively used in the Philippines to plan enforcement actions and there is a growing list of apprehensions that occurred based on tip-offs from VIIRS. The VIIRS boat detection archive extends back to April 2012. A VIIRS closure index (VCI has been developed to rate the effectiveness of closures on monthly increments in terms of a percentage. The VCI analysis was performed on three types of closures: an ad hoc fishery closure associated with a toxic industrial discharge, a seasonal fishery closure and a permanent closure in restricted coastal waters. The VCI results indicate that it is possible to rank the effectiveness of different closure, year-to-year differences in compliance levels, and to identify closure encroachments which may warrant additional enforcement effort.

  4. Closure Strategy Nevada Test Site Area 5 Radioactive Waste Management Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-03-01

    This paper presents an overview of the strategy for closure of part of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), which is about 65 miles northwest of Las Vegas, Nevada (Figure 1). The Area 5 RWMS is in the northern part of Frenchman Flat, approximately 14 miles north of Mercury. The Area 5 RWMS encompasses 732 acres subdivided into quadrants, and is bounded by a 1,000-foot (ft)-wide buffer zone. The northwest and southwest quadrants have not been developed. The northeast and southeast quadrants have been used for disposal of unclassified low-level radioactive waste (LLW) and indefinite storage of classified materials. This paper focuses on closure of the 38 waste disposal and classified material storage units within the southeast quadrant of the Area 5 RWMS, called the ''92-Acre Area''. The U.S Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is currently planning to close the 92-Acre Area by 2011. Closure planning for this site must take into account the regulatory requirements for a diversity of waste streams, disposal and storage configurations, disposal history, and site conditions. For ease of discussion, the 92-Acre Area has been subdivided into six closure units defined by waste type, location, and similarity in regulatory requirements. Each of the closure units contains one or more waste disposal units; waste disposal units are also called waste disposal cells. The paper provides a brief background of the Area 5 RWMS, identifies key closure issues for the 92-Acre Area, recommends actions to address the issues, and provides the National Security Technologies, LLC (NSTec), schedule for closure.

  5. Production and characterization of monoclonal antibodies specific to pangasius catfish, basa, and tra.

    Science.gov (United States)

    Gajewski, K G; Chen, Y-T; Hsieh, Y-H P

    2009-04-01

    Four IgG (subclass IgG1) class monoclonal antibodies (MAbs) strongly reactive to Asian farm-raised Pangasius catfish, tra (Pangasius hypophthalmus) and basa (Pangasius bocourti), have been developed. These MAbs were raised by immunizing an animal with thermal-stable crude sarcoplasmic protein extract of cooked tra. The MAbs were selected by screening hybridoma clones against more than 70 common fish and meat protein extracts. Two MAbs, T7E10 and T1G11, were found to be specific to the Asian Pangasius catfish, tra, and basa, with no cross-reactions with any of the common fish and meat species or with the food additive proteins (bovine serum albumin, soy proteins, milk proteins, egg proteins, and gelatin) tested. MAb T7E10 recognized 2 antigenic proteins (molecular weight approximately 36 and 75 kDa) in raw and cooked tra and basa extracts, while T1G11 bound to several proteins (molecular weight between 13 and 18 kDa) in tra and basa extracts. Two other MAbs, F7B8 and F1G11, recognized a common protein (36 KDa) and cross-reacted with all the fish extracts tested and with several mammalian species. These MAbs can be employed individually or in combination in various formats of immunoassays for rapid identification of Pangasius catfish, either raw or cooked. They can also be used to study the biological, biochemical, and physiological aspects of thermal-stable antigenic proteins. This is the first study identifying these thermal-stable antigenic proteins present in Pangasius catfish as species-specific biomarkers.

  6. Maria Rizzarelli, Una terra che è solo visione. La poesia di Pasolini tra cinema e pittura

    Directory of Open Access Journals (Sweden)

    Paolo Lago

    2016-11-01

    Full Text Available La contaminazione tra scrittura e visione, la «natura anfibologica» tra parola e immagine, secondo una definizione dello stesso autore, risulta fondamentale nell’intera opera letteraria di Pier Paolo Pasolini.

  7. 77 FR 75186 - Notice of Closure, Target Shooting Public Safety Closure on the Lake Mountains in Utah County, UT

    Science.gov (United States)

    2012-12-19

    ... Land Management, Department of the Interior. ACTION: Notice of Closure. SUMMARY: The Bureau of Land... impacts is completed through the land use planning process. The Lake Mountains are a small mountain range... ridge. There are private residences along the lake shore. Utah Lake is a popular area for recreationists...

  8. Zaustavljanje broda koji nije u vlasništvu osobe odgovorne za pomorsku tražbinu : [prikaz presude

    Directory of Open Access Journals (Sweden)

    Jasenko Marin

    2002-12-01

    Full Text Available Načelno, privremeno zaustavljen može biti samo brod čiji je vlasnik protivnik osiguranja, odnosno osoba odgovorna za pomorsku tražbinu čije se osiguranje traži. U skladu s tim nije dopušteno zaustavljanje broda u vlasništvu trgovačkog društva čiji je jedini član osoba odgovorna za pomorsku tražbinu.

  9. Emozionanti mostri femminili tra storia e cinema

    Directory of Open Access Journals (Sweden)

    Angela Giallongo

    2014-10-01

    Full Text Available Ricorrendo al concetto chiave di paura, usato come categoria storica, il presente contributo esamina l’antico mito gorgonico in sette film e in alcuni esempi di Teen Movies. L’analisi critica focalizza l’attenzione sull’interdipendenza tra le emozioni negative, gli usi attuali di questa immagine archetipica e la ricerca storica sull’immaginario di genere.

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site; Lantow, Tiffany A. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  11. The Evolution of NR TrA (Nova TrA 2008) from 2008 through 2017

    Science.gov (United States)

    Walter, Frederick M.; Burwitz, Vadim; Kafka, Stella

    2018-06-01

    The classical nova NR TrA was discovered as an O-type optically-thick classical nova. There is no evidence that it formed dust. Within four years the envelope became sufficiently thin to reveal an eclipsing accretion disk-dominated system with orbitally-modulated permitted lines of C IV, N V, and O VI. XMM observations reveal a non-eclipsing soft X-ray source and a deeply-eclipsing UV continuum. We will present the first ten years of optical spectral evolution of this system accompanied by ten years of BVRIJHK photometry, with an eye to deciphering the current nature of the system.

  12. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  13. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    International Nuclear Information System (INIS)

    1995-04-01

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  14. Addendum to the post-closure permit application for the Bear Creek Hydrogeologic Regime at the Y-12 Plant: Walk-in pits. Revision 2

    International Nuclear Information System (INIS)

    1995-04-01

    The revised Closure Plan was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits (WIPs) of the Bear Creek Burial Grounds (BCBG). However, a strategy was developed to include the B Area [a solid waste management unit (SWMU)] with the WIPs so that both areas would be closed under one cap. The plan was presented to the State of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. Therefore, in November 1992, the Closure Plan for B Area and the WIPs was prepared separately from that of the other sites associated with the BCBG and was presented in a RCRA Closure Plan. The Closure Plan revision issued April 1993 was intended to reflect the placement of the Kerr Hollow Quarry debris at the WIPs, revise the closure data, and acknowledge that the disposition of a monitoring well within the closure site could not be verified. A Post-Closure Permit Application (PCPA) was to include the WIPs; however, at the time of submittal, closure of the WIPs had not been certified. This addendum contains information on the WIPs to accompany the BCBG PCPA. The purpose of this document is to supplement the information provided in the BCBG PCPA. This document is not intended to be a stand-alone document. Only additional information regarding the WIPs is included in the sections of this document, which correspond to sections of the PCPA submitted in June 1994

  15. Different foods in larvicultura of traíra (Hoplias malabaricus

    Directory of Open Access Journals (Sweden)

    Samuel Louzada Pereira

    2015-10-01

    Full Text Available ABSTRACT. Pereira S.L., Mendonça P.P., Pellanda A.S., Matielo M.D. & Gon- çalves Junior L.P. [Different foods in larvicultura of traíra (Hoplias malabaricus.] Utilização de diferentes alimentos na larvicultura de traíra (Hoplias malabaricus. Revista Brasileira de Medicina Veterinária, 37(3:233-238, 2015. Universidade Estadual do Norte Fluminense Darcy Ribeiro, Avenida Alberto Lamego, 2000, Parque Califórnia, Campos dos Goytacazes, RJ 28013-602, Brasil. E-mail: samuell_lp@hotmail.com The feeding in the larviculture of species carnivorous view point for closing of the technological packages of rearing culture. Developed in the sector of Aquicultura of the IFES - Campus of Alegre, this work it aimed at to compare the performance with four diet feed as first exogenous feeding for traíra (Hoplias malabaricus, parameters evaluated: Survival, length final (CF, final weight (PF, tax of specific growth (TCE, development tax specifies (TDE, being put in container with fifteen liters of water, with constant aeration, have five larva of traíra/container. The delineation entire was aleatory with four treatments and five repetitions. Being the diet feeds represented for T1: Nauplios de Artemia sp.; T2: microworm of oats (Pannagrelos redivivus; T3: Wild Zooplâncton; e the inert food represented by T4: Commercial ration in dust with 55% of crude protein and 4,200 Kcal de ED/kg of ration. The water exchange was of 80% daily, the average temperature was of 27.5±1°C. The indices of survival in the T1, T2, T3 and T4, had been 84%, 72%, 100% and 92%, respectively. The date had been submitted analyze it statistics ANOVA and test of Tukey (P<0.01. Wild Zooplâncton was biggest CTF, PF, GP, TCE and TDE. Did not have difference statistics between the Artemia sp. the ration for TCE and TDE. The microworm of oats was minor CF, PF, TCE and TDE. The treatment Wild zooplankton (T3 showed optimum diet food among the other diet feeds tested for the development and

  16. ASSESSMENT OF LENS THICKNESS IN ANGLE CLOSURE DISEASE

    Directory of Open Access Journals (Sweden)

    Nishat Sultana Khayoom

    2016-08-01

    Full Text Available BACKGROUND Anterior chamber depth and lens thickness have been considered as important biometric determinants in primary angle-closure glaucoma. Patients with primary narrow angle may be classified as a primary angle closure suspect (PACS, or as having primary angle closure (PAC or primary angle closure glaucoma (PACG. 23.9% of patients with primary angle closure disease are in India, which highlights the importance of understanding the disease, its natural history, and its underlying pathophysiology, so that we may try to establish effective methods of treatment and preventative measures to delay, or even arrest, disease progression, thereby reducing visual morbidity. AIM To determine the lens thickness using A-scan biometry and its significance in various stages of angle closure disease. MATERIALS AND METHODS Patients attending outpatient department at Minto Ophthalmic Hospital between October 2013 to May 2015 were screened for angle closure disease and subsequently evaluated at glaucoma department. In our study, lens thickness showed a direct correlation with shallowing of the anterior chamber by determining the LT/ ACD ratio. A decrease in anterior chamber depth is proportional to the narrowing of the angle which contributes to the progression of the angle closure disease from just apposition to occlusion enhancing the risk for optic nerve damage and visual field loss. Hence, if the lens thickness values are assessed earlier in the disease process, appropriate intervention can be planned. CONCLUSION Determination of lens changes along with anterior chamber depth and axial length morphometrically can aid in early detection of angle closure. The role of lens extraction for PACG is a subject of increased interest. Lens extraction promotes the benefits of anatomical opening of the angle, IOP reduction and improved vision. This potential intervention may be one among the armamentarium of approaches for PACG. Among the current treatment modalities

  17. Theory of reasoned action and theory of planned behavior-based dietary interventions in adolescents and young adults: a systematic review

    OpenAIRE

    Hackman CL; Knowlden AP

    2014-01-01

    Christine L Hackman, Adam P KnowldenDepartment of Health Science, The University of Alabama, Tuscaloosa, AL, USABackground: Childhood obesity has reached epidemic proportions in many nations around the world. The theory of planned behavior (TPB) and the theory of reasoned action (TRA) have been used to successfully plan and evaluate numerous interventions for many different behaviors. The aim of this study was to systematically review and synthesize TPB and TRA-based dietary behavior interven...

  18. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  19. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  20. Accelerating cleanup. Paths to closure Hanford Site

    International Nuclear Information System (INIS)

    Edwards, C.

    1998-01-01

    This document was previously referred to as the Draft 2006 Plan. As part of the DOE's national strategy, the Richland Operations Office's Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established

  1. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Dave Madsen

    1998-08-01

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices. The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.

  2. Closure report for CAU 93: Area 6 steam cleaning effluent ponds, Nevada Test Site. Volume 1

    International Nuclear Information System (INIS)

    1997-12-01

    The Steam Cleaning Effluent Ponds (SCEP) waste unit is located in Area 6 at the Nevada Test Site. The SCEPs are evaporation basins formerly used for the disposal of untreated liquid effluent discharged from steam cleaning activities associated with Buildings 6-623 and 6-800. This closure report documents the strategy and analytical results that support the clean closure or closure in place of each of the components within CAU 93. In addition, the report documents all deviations from the approved closure plan and provides rationale for all deviations

  3. 303-K Storage Facility: Report on FY98 closure activities

    International Nuclear Information System (INIS)

    Adler, J.G.

    1998-01-01

    This report summarizes and evaluates the decontamination activities, sampling activities, and sample analysis performed in support of the closure of the 303-K Storage Facility. The evaluation is based on the validated data included in the data validation package (98-EAP-346) for the 303-K Storage Facility. The results of this evaluation will be used for assessing contamination for the purpose of closing the 303-K Storage Facility as described in the 303-K Storage Facility Closure Plan, DOE/RL-90-04. The closure strategy for the 303-K Storage Facility is to decontaminate the interior of the north half of the 303-K Building to remove known or suspected dangerous waste contamination, to sample the interior concrete and exterior soils for the constituents of concern, and then to perform data analysis, with an evaluation to determine if the closure activities and data meet the closure criteria. The closure criteria for the 303-K Storage Facility is that the concentrations of constituents of concern are not present above the cleanup levels. Based on the evaluation of the decontamination activities, sampling activities, and sample data, determination has been made that the soils at the 303-K Storage Facility meet the cleanup performance standards (WMH 1997) and can be clean closed. The evaluation determined that the 303-K Building cannot be clean closed without additional closure activities. An additional evaluation will be needed to determine the specific activities required to clean close the 303-K Storage Facility. The radiological contamination at the 303-K Storage Facility is not addressed by the closure strategy

  4. Integrated approach for disease management and growth enhancement of Sesamum indicum L. utilizing Azotobacter chroococcum TRA2 and chemical fertilizer.

    Science.gov (United States)

    Maheshwari, D K; Dubey, R C; Aeron, Abhinav; Kumar, Bhavesh; Kumar, Sandeep; Tewari, Sakshi; Arora, Naveen Kumar

    2012-10-01

    Azotobacter chroococcum TRA2, an isolate of wheat rhizosphere displayed plant growth promoting attributes including indole acetic acid, HCN, siderophore production, solubilization of inorganic phosphate and fixation of atmospheric nitrogen. In addition, it showed strong antagonistic effect against Macrophomina phaseolina and Fusarium oxysporum. It also caused degradation and digestion of cell wall components, resulting in hyphal perforations, empty cell (halo) formation, shrinking and lysis of fungal mycelia along with significant degeneration of conidia. Fertilizer adaptive variant strain of A. chroococcum TRA2 was studied with Tn5 induced streptomycin resistant transconjugants of wild type tetracycline-resistant TRA2 (designated TRA2(tetra+strep+)) after different durations. The strain was significantly competent in rhizosphere, as its population increased by 15.29 % in rhizosphere of Sesamum indicum. Seed bacterization with the strain TRA2 resulted in significant increase in vegetative growth parameters and yield of sesame over the non-bacterized seeds. However, application of TRA2 with half dose of fertilizers showed sesame yield almost similar to that obtained by full dose treatment. Moreover, the oil yield increased by 24.20 %, while protein yield increased by 35.92 % in treatment receiving half dose of fertilizer along with TRA2 bacterized seeds, as compared to untreated control.

  5. Premature closure of the Trojan Nuclear Plant

    International Nuclear Information System (INIS)

    Kononetz, B.P.

    1995-01-01

    The premature closure of the Trojan Nuclear Plant is discussed in outline form. The topics discussed include: an overview of Trojan; events leading to shutdown decision; Trojan's lifetime O ampersand M performance; Trojan's Regulatory performance; historical Trojan regulatory versus economic performance; applicable Oregon law; least-cost planning process; 1992 least cost plan; 1993 LCP update; LCP limitations; comparative performance analysis; management assessments; Trojan O ampersand M analysis; steam generator issues; quantification of deficiencies; quantification of impact of steam generator degradation; 'net benefits' test; conclusions from net benefits analysis; total disallowances; and conclusions and ramifications

  6. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    Silvas, A. J.

    2014-01-01

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not

  7. Infiltration experiment for closure cap evaluation at the Savannah River Site

    International Nuclear Information System (INIS)

    Roddy, N.S.; Cook, J.R.

    1990-01-01

    This document discusses several large waste disposal facilities at the Savannah River Site which are being closed. These facilities include two seepage basins and the low-level waste disposal facility. The key element of the closures is the construction of a cap system to limit the infiltration of water which might reach the disposed waste. Cap designs have been modeled using the Hydrologic Evaluation of Landfill Performance (HELP) computer code. This code was developed by the US Army Corps of Engineers for the Environmental Protection Agency to model the effects of various cap and liner designs on the water balance at landfills. A field experiment has been set up which will allow the results of the HELP Code to be verified at the Savannah River Site (SRS) by measuring the actual water balance created by closure cap configurations which will be used in waste site closures at SRS. Two of the caps will be similar to those used for the planned closure activities. Each one has a specific closure arrangement. Once operational, the experiment will be evaluated for a five-year period

  8. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  9. The 4843 Alkali Metal Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-06-01

    The 4843 AMSF has been used primarily to provide a centralized building to receive and store dangerous and mixed alkali metal waste, including sodium and lithium, which has been generated at the Fast Flux Test Facility and at various other Hanford Site operations that used alkali metals. Most of the dangerous and mixed alkali metal waste received consists of retired equipment from liquid sodium processes. The unit continues to store material. In general, only solid alkali metal waste that is water reactive is stored at the 4843 AMSF. The 4843 AMSF will be closed in a manner consistent with Ecology guidelines and regulations (WAC 173-303-610). The general closure procedure is detailed as follows

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  11. 300 Area Process Trenches Postclosure Plan

    International Nuclear Information System (INIS)

    Badden, J.W.

    1998-05-01

    The 300 Area Process Trenches (300 APT) certified closure under a modified closure option and in compliance with Condition II.K.3 oft he Hartford Facility Dangerous Waste Permit (Penit) (Ecology 1994). Modified closure has been determined to be the appropriate closure option for this unit due to groundwater that remains contaminated from past operations at the 300 APT. Corrective actions required for dangerous waste constituents remaining in groundwater will occur pursuant to the 300 APT Resource Conservation and Recovery Act (RCRA) Final Status Facility Ground Water Monitoring Plan, the Hanford Site Wide Dangerous Waste Permit, and in conjunction with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions at the 300-FF-5 Groundwater Operable Unit (OU) pursuant to the Record of Decision (ROD) (EPA 1996). This postclosure plan identifies the modified closure actions required at the unit under postclosure care. It contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit (condition II.K.3)

  12. Clinical use of serum TRA-1-60 as tumor marker in patients with germ cell cancer

    DEFF Research Database (Denmark)

    Lajer, Henrik; Daugaard, Gedske; Andersson, Anna-Maria

    2002-01-01

    TRA-1-60 antigen has been related to the presence of embryonal germ cell carcinoma (EC) and carcinoma in situ. Our study further investigated the clinical efficacy of TRA-1-60 as a serum tumor marker for germ cell cancer in the testis. Three groups of patients with germ cell tumors were included:...

  13. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  14. Road Closures

    Data.gov (United States)

    Montgomery County of Maryland — This is an up to date map of current road closures in Montgomery County.This dataset is updated every few minutes from the Department of Transportation road closure...

  15. Engineering study for closure of 209E facility

    Energy Technology Data Exchange (ETDEWEB)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  16. Engineering study for closure of 209E facility

    International Nuclear Information System (INIS)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-01-01

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed

  17. Interferometric Imaging Directly with Closure Phases and Closure Amplitudes

    Science.gov (United States)

    Chael, Andrew A.; Johnson, Michael D.; Bouman, Katherine L.; Blackburn, Lindy L.; Akiyama, Kazunori; Narayan, Ramesh

    2018-04-01

    Interferometric imaging now achieves angular resolutions as fine as ∼10 μas, probing scales that are inaccessible to single telescopes. Traditional synthesis imaging methods require calibrated visibilities; however, interferometric calibration is challenging, especially at high frequencies. Nevertheless, most studies present only a single image of their data after a process of “self-calibration,” an iterative procedure where the initial image and calibration assumptions can significantly influence the final image. We present a method for efficient interferometric imaging directly using only closure amplitudes and closure phases, which are immune to station-based calibration errors. Closure-only imaging provides results that are as noncommittal as possible and allows for reconstructing an image independently from separate amplitude and phase self-calibration. While closure-only imaging eliminates some image information (e.g., the total image flux density and the image centroid), this information can be recovered through a small number of additional constraints. We demonstrate that closure-only imaging can produce high-fidelity results, even for sparse arrays such as the Event Horizon Telescope, and that the resulting images are independent of the level of systematic amplitude error. We apply closure imaging to VLBA and ALMA data and show that it is capable of matching or exceeding the performance of traditional self-calibration and CLEAN for these data sets.

  18. Simultaneous spectral and photometric observations of the beat Cepheid U TrA

    International Nuclear Information System (INIS)

    Niva, G.D.; Schmidt, E.G.

    1981-01-01

    It was suggested that U TrA was a Cepheid with a modulated light curve. Further photometric and radial-velocity observations have confirmed this behaviour. Unfortunately, the radial velocities are too few in number and too scattered to allow a detailed analysis. This paper presents further photometric and spectroscopic observations of U TrA. The original intent was to obtain enough simultaneous observations to perform a Wesselink analysis similar to the one made for another beat Cepheid, TU Cas. Unfortunately, this has not been possible. However, the data obtained are of high quality and are clearly useful in studies of the modal content and period stability of the star. (author)

  19. Information collection regarding geoscientific monitoring techniques during closure of underground facility in crystalline rock

    International Nuclear Information System (INIS)

    Hosoya, Shinichi; Yamashita, Tadashi; Iwatsuki, Teruki; Saegusa, Hiromitsu; Onoe, Hironori; Ishibashi, Masayuki

    2016-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified the critical issues on the geoscientific research program: “Development of modelling technologies for mass transport”, “Development of drift backfilling technologies” and “Development of technologies for reducing groundwater inflow”, based on the latest results of the synthesizing R and D. The purposes of the “Development of drift backfilling technologies” are to develop closure methodology and technology, and long-term monitoring technology, and to evaluate resilience of geological environment. In order to achieve the purposes, previous information from the case example of underground facility constructed in crystalline rock in Europe has been collected in this study. In particular, the boundary conditions for the closure, geological characteristics, technical specifications, and method of monitoring have been focused. The information on the international project regarding drift closure test and development of monitoring technologies has also been collected. In addition, interviews were conducted to Finnish and Swedish specialists who have experiences involving planning, construction management, monitoring, and safety assessment for the closure to obtain the technical knowledge. Based on the collected information, concept and point of attention, which are regarding drift closure testing, and planning, execution management and monitoring on the closure of MIU, have been specified. (author)

  20. Assessment of exposure to traffic pollution using the ExTra index: study of validation

    International Nuclear Information System (INIS)

    Reungoat, Patrice; Chiron, Mireille; Gauvin, Stephanie; Le Moullec, Y.; Momas, Isabelle

    2003-01-01

    The ExTra index, produced by the French Scientific Center for Building Physics, evaluates ambient concentrations of transport-related pollutants in front of the work and living places of urban dwellers. This study contributes to the validation of the ExTra index by carrying out measurements in four French cities. It compares nitrogen oxide concentrations (NO x ) measured over 6 weeks with passive samplers, and NO x calculated concentrations using the ExTra index. The study takes into account traffic density, topographical parameters (building height, road, and pavement width), weather conditions (wind direction and strength), and background pollution levels. The model was tested at 100 street canyons sites. There were highly significant correlations (0.90 in Grenoble, 0.95 in Nice, 0.89 in Paris, and 0.89 in Toulouse) and good intraclass correlation coefficients (0.75 in Grenoble, 0.91 in Nice, 0.89 in Paris, and 0.86 in Toulouse) between the two series of values. These results suggest that if the ExTra index were to be applied to all the different residences and workplaces of a subject throughout his (her) life, it could be a useful epidemiological tool for studying the long-term health effects of transport-related emissions and for reconstructing individual exposure to such pollution in order to avoid misclassification

  1. RCRA land unit closures at the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; Delozier, M.F.P.; Manrod, W.E.

    1987-01-01

    Eight land-based hazardous waste management units at the Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA program include the development of risk assessments and the preparation of an integrated schedule

  2. Cartografar é traçar um plano comum

    Directory of Open Access Journals (Sweden)

    Virgínia Kastrup

    2013-08-01

    Full Text Available A pesquisa de campo sobre produção da subjetividade enfrenta o problema de construir conhecimento envolvendo pesquisadores e pesquisados, com territórios e semióticas singulares. Surgem questões relativas ao protagonismo dos participantes e a como traçar com eles um plano comum, garantindo o caráter participativo da pesquisa. No contexto do método da cartografia, o artigo tem como objetivo tratar do tema do comum num duplo aspecto. Num primeiro, discute o acesso ao plano comum. Com base em Gilles Deleuze e Felix Guattari, tal plano não é dito homogêneo nem reúne atores que manteriam entre si relações de identidade, mas opera comunicação entre singularidades, sendo pré-individual e coletivo. Num segundo aspecto, aponta que, enquanto pesquisa-intervenção, a cartografia se compromete com a criação de um mundo comum e heterogêneo. O artigo mostra que o traçado do comum tem como diretriz metodológica a tranversalidade e examina os procedimentos de participação, inclusão e tradução.

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  5. Facility Closure Report for T-Tunnel (U12T), Area 12, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    This Facility Closure Report (FCR) has been prepared to document the actions taken to permanently close the remaining accessible areas of U12t-Tunnel (T-Tunnel) in Area 12 of the Nevada Test Site (NTS). The closure of T-Tunnel was a prerequisite to transfer facility ownership from the Defense Threat Reduction Agency (DTRA) to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Closure of the facility was accomplished with the cooperation and concurrence of both NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The purpose of this FCR is to document that the closure of T-Tunnel complied with the closure requirements specified in the Facility Closure Plan for N- and T-Tunnels Area 12, Nevada Test Site (Appendix D) and that the facility is ready for transfer to NNSA/NSO. The Facility Closure Plan (FCP) is provided in Appendix D. T-Tunnel is located approximately 42 miles north of Mercury in Area 12 of the NTS (Figure 1). Between 1970 and 1987, T-Tunnel was used for six Nuclear Weapons Effects Tests (NWETs). The tunnel was excavated horizontally into the volcanic tuffs of Rainier Mesa. The T-Tunnel complex consists of a main access drift with two NWET containment structures, a Gas Seal Plug (GSP), and a Gas Seal Door (GSD) (Figure 2). The T-Tunnel complex was mothballed in 1993 to preserve the tunnel for resumption of testing, should it happen in the future, to stop the discharge of tunnel effluent, and to prevent unauthorized access. This was accomplished by sealing the main drift GSD

  6. Torque nos rodados motrizes de um trator agrícola submetido a ensaios de tração

    Directory of Open Access Journals (Sweden)

    Diego A. Fiorese

    2015-09-01

    Full Text Available RESUMOA determinação do torque nos rodados motrizes dos tratores agrícolas complementa os ensaios de tração e permite o cálculo da distribuição dos esforços tratórios entre os eixos. O objetivo principal desta pesquisa foi determinar a demanda de torque nos rodados motrizes de um trator com potência do motor de 89 kW, buscando avaliar o torque demandado em função da utilização da tração dianteira assistida (TDA, para distintas marchas e conforme aumento da força de tração. Foram realizados ensaios de tração sobre pista de concreto utilizando-se um torciômetro instalado no eixo traseiro do trator, um carro dinamométrico e instrumentação eletrônica para aquisição de dados. Avaliaram-se a TDA ligada e desligada, quatro marchas (5, 7, 8 e 9 km h-1 e oito cargas na barra de tração (4, 8, 12, 16, 20, 24, 28, 30 kN. Os resultados analisados estatisticamente através de equações de regressão indicaram comportamento similar para todas as marchas sendo que, conforme o aumento da força de tração ocorreu crescimento linear da demanda de torque nos eixos motrizes. Com a TDA ligada nas cargas mais baixas o torque é maior no eixo dianteiro e nas cargas mais altas é maior no eixo traseiro.

  7. Material balance and diet in bioregenerative life support systems: Connection with coefficient of closure

    Science.gov (United States)

    Manukovsky, N. S.; Kovalev, V. S.; Somova, L. A.; Gurevich, Yu. L.; Sadovsky, M. G.

    Bioregenerative life support systems (BLSS) with different coefficients of closure are considered. The 66.2% coefficient of closure achieved in "BIOS-3" facility experiments has been taken as a base value. The increase in coefficient of closure up to 72.6-93.0% is planned due to use of soil-like substrate (SLS) and concentrating of urine. Food values were estimated both in a base variant ("BIOS-3"), and with increases in the coefficient of closure. It is shown that food requirements will be more fully satisfied by internal crop production with an increase in the coefficient of closure of the BLSS. Changes of massflow rates on an 'input-output' and inside BLSS are considered. Equations of synthesis and degradation of organic substances in BLSS were examined using a stoichiometric model. The paper shows that at incomplete closure of BLSS containing SLS there is a problem of nitrogen balancing. To compensate for the removal of nitrogen from the system in urine and feces, it is necessary to introduce food and a nitrogen-containing additive.

  8. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100 ampersand D3 and Y/ER-53 ampersand D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 426: Cactus Spring Waste Trenches (TTR); (5) CAU 453: Area 9 UXO Landfill (TTR); (6) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR); and (7) CAU 487: Thunderwell Site (TTR). The annual post-closure inspections were conducted May 5-6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation

  11. Closure The Definitive Guide

    CERN Document Server

    Bolin, Michael

    2010-01-01

    If you're ready to use Closure to build rich web applications with JavaScript, this hands-on guide has precisely what you need to learn this suite of tools in depth. Closure makes it easy for experienced JavaScript developers to write and maintain large and complex codebases -- as Google has demonstrated by using Closure with Gmail, Google Docs, and Google Maps. Author and Closure contributor Michael Bolin has included numerous code examples and best practices, as well as valuable information not available publicly until now. You'll learn all about Closure's Library, Compiler, Templates, tes

  12. Giorgio Perlasca, 'Giusto tra le nazioni' e 'eroe italiano'

    NARCIS (Netherlands)

    Jansen, M.M.

    2008-01-01

    Giorgio Perlasca che, fingendosi console spagnolo, nel 1944 salvò più di cinquemila ebrei ungheresi a Budapest, è stato proclamato “Giusto tra le Nazioni” a Yad Vashem nel 1989, dopo di che è seguito il suo riconoscimento all’estero ed in Italia come “uomo giusto” e come “eroe italiano”. Dopo il

  13. The clinical effects of closure of the hernia gap after laparoscopic ventral hernia repair:

    DEFF Research Database (Denmark)

    Christoffersen, Mette W; Westen, Mikkel; Assadzadeh, Sami

    2014-01-01

    randomised controlled trials. The primary purpose of this paper is to compare early post-operative activity-related pain in patients undergoing laparoscopic ventral hernia repair with closure of the gap with patients undergoing standard laparoscopic ventral hernia repair (non-closure of the gap). Secondary...... outcomes are patient-rated cosmesis and hernia-specific quality of life. METHODS: A randomised, controlled, double-blinded study is planned. Based on power calculation, we will include 40 patients in each arm. Patients undergoing elective laparoscopic umbilical, epigastric or umbilical trocar-site hernia...... repair at Hvidovre Hospital and Herlev Hospital, Denmark, are invited to participate. CONCLUSION: The gap closure technique may induce more post-operative pain than the non-closure repair, but it may also be superior with regard to other important surgical outcomes. No studies have previously...

  14. Incorporating Sustainability into Site Closure - A Field Example

    Science.gov (United States)

    Austrins, L. M.; West, J.

    2013-12-01

    Long term management of former chemical production facilities can be a costly and time consuming element of site closure, however, implementation of creative measures to introduce sustainability and reduce the need for onsite presence can be successfully incorporated into the site closure process. A case study demonstrating this involves a facility located in Sarnia, Ontario, which was an active multi chemical production facility from the 1940s, until it was decommissioned and sold between 2005 and 2010. The facility consisted of 322 acres of production areas. Several elements which allowed for reduced onsite presence and lower management costs were incorporated into the site decommissioning plan, including; phased remediation planning, and selection of sustainable components as part of remediation, surface water management, and groundwater management. The sustainability and management modifications were successfully negotiated and approved by the local regulatory agency. Due to the size and complexity of the site, a holistic approach for the facility was needed and included the development of a comprehensive decision matrix. Each remediation alternative incorporated sustainable practices. Ex-situ remediation consisted of excavation of contaminated subsurface medium and consolidation at a 4.7 acre onsite soil treatment area designed specifically for the site closure process. In-situ remediation consisted of injection of amendment into the native soils using hydraulic fracture and injection. When the plant was an active operating facility, groundwater management required active pumping and groundwater treatment through a series of carbon treatment units. Active pumping has been replaced by passive hydraulic control through the use of tree plantations.

  15. Characterization Plan for Soils Around Drain Line PLA-100115

    Energy Technology Data Exchange (ETDEWEB)

    D. Shanklin

    2006-05-24

    This Characterization Plan supports the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) closure of soils that may have been contaminated by releases from drain line PLA-100115, located within the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The requirements to address the closure of soils contaminated by a potential release from this line in a characterization plan was identified in the "HWMA/RCRA Less Than 90-day Generator Closure Report for the VES-SFE-126."

  16. Shuttle Planning for Link Closures in Urban Public Transport Networks

    DEFF Research Database (Denmark)

    van der Hurk, Evelien; Koutsopoulos, Haris N.; Wilson, Nigel

    2016-01-01

    Urban public transport systems must periodically close certain links for maintenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the closed links with a simple shuttle service. However, alternative...... cost, which includes transfers and frequency-dependent waiting time costs. This model is applied to a shuttle design problem based on a real-world case study of the Massachusetts Bay Transportation Authority network of Boston, Massachusetts. The results show that additional shuttle routes can reduce...

  17. Closure Report for Corrective Action Unit 124, Storage Tanks, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2008-01-01

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 124, Storage Tanks, Nevada Test Site (NTS), Nevada. This report complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended January 2007). This CR provides documentation and justification for the closure of CAU 124 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted in accordance with the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (NNSA/NSO, 2007). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. Therefore, this information will not be repeated in this CR.

  18. Environmental analysis of closure options for waste sites at the Savannah River Plant

    International Nuclear Information System (INIS)

    Gordon, D.E.; King, C.M.; Looney, B.B.; Stephenson, D.E.; Johnson, W.F.

    1987-01-01

    Previously acceptable waste management practices (e.g., the use of unlined seepage basins) for discarding of wastes from nuclear materials production has resulted in occasional cases of groundwater contamination beneath some disposal sites, mainly in water-table aquifers. Groundwater contaminants include volatile organic compounds, heavy metals, radionuclides, and other chemicals. The closure of active and inactive waste sites that have received hazardous and/or low-level radioactive materials at the Savannah River Plant (SRP) is planned as part of an overall program to protect groundwater quality. DOE developed and submitted to Congress a groundwater protection plan for SRP. This initial plan and subsequent revisions provide the basis for closure of SRP waste sites to comply with applicable groundwater protection requirements. An environmental analysis of the closure options for the criteria waste sites that have received hazardous and/or low-level radioactive wastes was conducted to provide technical support. The several parts of this environmental analysis include description of geohydrologic conditions; determination of waste inventories; definition of closure options; modeling of environmental pathways; assessment of risk; and analysis of project costs. Each of these components of the overall analysis is described in turn in the following paragraphs. Production operations at SRP have generated a variety of solid, hazardous, and low-level radioactive waste materials. Several locations onplant have been used as waste disposal sites for solid and liquid wastes. Seventy-six individual waste sites at 45 distinct geographical locations on SRP have received hazardous, low-level radioactive, or mixed wastes. These waste sites can be categorized into 26 groupings according to the function of the waste disposed. 15 refs., 6 figs., 5 tabs

  19. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    Energy Technology Data Exchange (ETDEWEB)

    Ketusky, Edward [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Blanton, Paul [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bobbitt, John H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-03-11

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactive material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.

  20. Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    International Nuclear Information System (INIS)

    Campbell, K.B.

    2001-11-01

    This Closure Report provides the documentation for closure of the Central Nevada Test Area (CNTA) surface Corrective Action Unit (CAU) 417. The CNTA is located in Hot Creek Valley in Nye County, Nevada, approximately 22.5 kilometers (14 miles) west of U.S. State Highway 6 near the Moores Station historical site, and approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. A nuclear device for Project Faultless was detonated approximately 975 meters (3,200 feet) below ground surface on January 19, 1968, in emplacement boring UC-1 (Department of Energy, Nevada Operation Office [DOE/NV], 1997). CAU 417 consists of 34 Corrective Action Sites (CASs). Site closure was completed using a Nevada Department of Environmental Protection (NDEP) approved Corrective Action Plan (CAP) (DOE/NV, 2000) which was based on the recommendations presented in the NDEP-approved Corrective Action Decision Document (DOE/NV, 1999). Closure of CAU 417 was completed in two phases. Phase I field activities were completed with NDEP concurrence during 1999 as outlined in the Phase I Work Plan, Appendix A of the CAP (DOE/NV, 2000), and as summarized in Section 2.1.2 of this document

  1. La portata etica della tragedia tra Bernard Williams e Martha Nussbaum

    Directory of Open Access Journals (Sweden)

    Francesco Testini

    2015-11-01

    Full Text Available Questo breve scritto si propone di ripercorrere sinteticamente alcuni nodi fondamentali del dibattito filosofico tra Bernard Williams e Martha Nussbaum sul significato e sul valore etico della rappresentazione tragica non tanto all’interno del mondo greco quanto per la contemporaneità. Il campo su cui questa analisi intende muoversi è delimitato principalmente da due testi fondamentali come Vergogna e Necessità e l’introduzione alla nuova edizione del 2001, insieme alla prima parte, de La fragilità del bene. Si cercherà di mostrare lo scarto tra queste due diverse concezioni riconducendo ad ognuna il particolare atteggiamento etico che sostiene; di questi diversi punti di vista si cercherà di ricostruire il nesso con le differenti interpretazioni che i due autori forniscono dell’Agamennone di Eschilo e con le diverse reazioni che motivano nei confronti del protagonista e della sua vicenda. Gli obiettivi delle argomentazioni che seguono sono principalmente due: innanzitutto evidenziare come in alcune delle critiche mosse dalla filosofa americana al collega britannico siano rinvenibili spunti fondamentali per quella che si ritiene una più completa comprensione della tragedia come caso limite del conflitto tra soggetto etico e mondo e, in secondo luogo, produrre una giustificazione filosofica ulteriore della reazione motivata da Nussbaum davanti alla condotta di Agamennone che sia compatibile con l’approccio di Williams attraverso una riproposizione del conflitto di valori in termini di conflitto di ruoli.

  2. Exact Tandem Repeats Analyzer (E-TRA): A new program for DNA ...

    Indian Academy of Sciences (India)

    Unknown

    Advanced user defined parameters/options let the researchers use different minimum motif repeats ... E-TRA, we used 5,465,605 human EST sequences derived from 18,814,550 ..... repeat rates of T-cells, embryo and testis were higher.

  3. An approach to handling timescales in post-closure safety assessment

    International Nuclear Information System (INIS)

    Bailey, L.; Littleboy, A.

    2002-01-01

    Previous Nirex post-closure assessments of deep geological disposal have been based on the use of probabilistic safety analysis covering many millions of years. However, Nirex has also published an assessment methodology in which the assessment timescale is divided into a number of discrete periods of time (time frames). Nirex is currently at the stage of planning the next update to its generic post-closure performance assessment and is considering the merits of using an assessment methodology based on time frames, in order to improve links with operational assessments and the provision of advice on the packaging of wastes, and to encourage stakeholder dialogue. This paper has been prepared as part of Nirex's aim, wherever possible, to 'preview', or seek input from others on, its ideas for new work to generate discussion and feedback. It describes an evolution of Nirex's published assessment methodology and outlines how it could be applied in an updated post-closure performance assessment of the Nirex generic phased disposal concept. (authors)

  4. Professional Closure Beyond State Authorization

    Directory of Open Access Journals (Sweden)

    Gitte Sommer Harrits

    2014-03-01

    Full Text Available For decades, the Weberian approach to the study of professions has been strong, emphasizing state authorization and market monopolies as constituting what is considered a profession. Originally, however, the Weberian conception of closure, or the ways in which a profession is constituted and made separate, was broader. This article suggests a revision of the closure concept, integrating insights from Pierre Bourdieu, and conceptualizing professional closure as the intersection of social, symbolic and legal closure. Based on this revision, this article demonstrates how to apply such a concept in empirical studies. This is done by exploring social, symbolic and legal closure across sixteen professional degree programs. The analyses show a tendency for some overlap between different forms of closure, with a somewhat divergent pattern for legal closure. Results support the argument that we need to study these processes as an intersection of different sources of closure, including capital, lifestyles and discourse

  5. Troughs on Martian Ice Sheets: Analysis of Their Closure and Mass Balance

    Science.gov (United States)

    Fountain, A.; Kargel, J.; Lewis, K.; MacAyeal, D.; Pfeffer, T.; Zwally, J.

    2000-01-01

    At the Copenhagen workshop on Martian polar processes, Ralf Greve commented that the flow regime surrounding scarps and troughs of the Martian polar ice sheets cannot be modeled using traditional "plan view" ice-sheet models. Such models are inadequate because they typically use reduced equations that embody certain simplifications applicable only to terrestrial ice sheets where the upper ice sheet surface is smooth. In response to this suggestion, we have constructed a 2-dimensional, time dependent "side view" (two spatial dimensions: one horizontal, one vertical) model of scarp closure that is designed to overcome the difficulties described by Greve. The purpose of the model is to evaluate the scales of stress variation and styles of flow closure so as to estimate errors that may be encountered by "plan view" models. We show that there may be avenues whereby the complications associated with scarp closure can be overcome in "plan view" models through appropriate parameterizations of 3-dimensional effects. Following this, we apply the flow model to simulate the evolution of a typical scarp on the North Polar Cap of Mars. Our simulations investigate: (a) the role of "radiation trapping" (see our companion abstract) in creating and maintaining "spiral-like" scarps on the ice sheet, (b) the consequences of different flowlaws and ice compositions on scarp evolution and, in particular, scarp age, and (c) the role of dust and debris in scarp evolution.

  6. Tra cinema e fumetto: due usi del montaggio

    Directory of Open Access Journals (Sweden)

    Giuseppe Saitta

    2016-01-01

    Full Text Available Entrambi linguaggi visivi, ove la narrazione si dipana grazie al rapporto di interdipendenza cheogni singola immagine intrattiene con l'immagine che la precede e quella che le succede. Pur dovendo ricorrere dunque a un montaggio di immagini, fumetto e cinema presentano tra di loro grandi differenze, ma anche grandi similitudini. Cercheremo di scoprire quali sono affidandoci all'analisi della duplice trasposizione di "300" da parte di Frank Miller e Zack Snyder.

  7. Chernobyl: closure by 2000

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Discussions on the future of the Chernobyl nuclear plant between the Ukrainian government, the Group of Seven Industrial nations (GT) and the European Union (EU) are summarized. At the G7 meeting, a timetable for the closure of the entire station by 2000 was presented by Ukrainian officials. The timetable depends on financial commitments from Western governments. Without these, the project would take 10 to 15 years. Following this meeting, which took place on 16-17th May 1995. EU finance ministers authorized release of a ECU 85 million loan. On 23 May, the European Parliament's Committee on Research, Technology and Energy held a public hearing on the Chernobyl station. The primary topic was a feasibility study on the clean-up of Chernobyl 4 and plans for the sarcophagus. Other matters discussed included the effect of the delays and indecision in settling the plants's future. Safety improvements being made to other RBMKs were not being carried out at Chernobyl because of the expected closure. The replacement of the power now supplied to the Ukraine by the Chernobyl reactors is also an issue. The solution favoured by the Ukraine is to being on-line three VVER-1000s that are currently close to completion. Western governments find this solution difficult to accept, however. (UK)

  8. Tight closure and vanishing theorems

    International Nuclear Information System (INIS)

    Smith, K.E.

    2001-01-01

    Tight closure has become a thriving branch of commutative algebra since it was first introduced by Mel Hochster and Craig Huneke in 1986. Over the past few years, it has become increasingly clear that tight closure has deep connections with complex algebraic geometry as well, especially with those areas of algebraic geometry where vanishing theorems play a starring role. The purpose of these lectures is to introduce tight closure and to explain some of these connections with algebraic geometry. Tight closure is basically a technique for harnessing the power of the Frobenius map. The use of the Frobenius map to prove theorems about complex algebraic varieties is a familiar technique in algebraic geometry, so it should perhaps come as no surprise that tight closure is applicable to algebraic geometry. On the other hand, it seems that so far we are only seeing the tip of a large and very beautiful iceberg in terms of tight closure's interpretation and applications to algebraic geometry. Interestingly, although tight closure is a 'characteristic p' tool, many of the problems where tight closure has proved useful have also yielded to analytic (L2) techniques. Despite some striking parallels, there had been no specific result directly linking tight closure and L∼ techniques. Recently, however, the equivalence of an ideal central to the theory of tight closure was shown to be equivalent to a certain 'multiplier ideal' first defined using L2 methods. Presumably, deeper connections will continue to emerge. There are two main types of problems for which tight closure has been helpful: in identifying nice structure and in establishing uniform behavior. The original algebraic applications of tight closure include, for example, a quick proof of the Hochster-Roberts theorem on the Cohen-Macaulayness of rings of invariants, and also a refined version of the Brianqon-Skoda theorem on the uniform behaviour of integral closures of powers of ideals. More recent, geometric

  9. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Robert [Univ. of Illinois, Champaign, IL (United States); Payne, William [Schlumberger Carbon Services, Houston, TX (United States); Kirksey, Jim [Univ. of Illinois, Champaign, IL (United States)

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  10. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  11. Post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy

    International Nuclear Information System (INIS)

    Khan, A.W.; Maqsood, R.; Saleem, M.M.

    2017-01-01

    To compare the mean post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy. Study Design: Randomized controlled trial. Place and Duration of Study: Department of General Surgery Combined Military Hospital Quetta, from 1st August 2014 to 30th April 2015. Material and Methods: A total of 60 patients were included in this study and were divided into two groups of 30 each. Patients in group A underwent open appendectomy with closure of peritoneum while patients in group B had non-closure of peritoneum during the same procedure. Post-operatively, pain severity was assessed on visual analogue scale (VAS) numeric pain distress scale. On presence of VAS numeric pain distress scale between 5 to 7, intramuscular (IM) diclofenac sodium was given and on score >7, intravascular (IV) tramadol was given. The final outcome was measured at day 0 and day 1. Results: Pain score and analgesic requirements were significantly less in non-closure group than closure group on day 0 and day 1, showing statistically significant difference between the two groups. Conclusion: Mean post-operative analgesic requirement is significantly less in non-closure group as compared to closure group during open appendectomy. (author)

  12. Utility of the theories of reasoned action and planned behavior for predicting physician behavior: a prospective analysis.

    Science.gov (United States)

    Millstein, S G

    1996-09-01

    The utility of the theory of reasoned action (TRA) and the theory of planned behavior (TPB) for prospectively predicting physicians' delivery of preventive services was compared. Primary care physicians (N = 765) completed 2 mail surveys at periods 6 months apart. The addition of perceived behavioral control to the TRA model significantly increased the variance accounted for in behavioral intention and subsequent behavior (p behavioral control had direct effects on behavior and interacted with social norms and behavioral intentions. Applications of models such as the TRA or TPB have focused primarily on predicting the behavioral intentions and behaviors of patients. Results suggest that these models have relevance for studying the behavior of health care providers as well.

  13. Primary closure after carotid endarterectomy is not inferior to other closure techniques.

    Science.gov (United States)

    Avgerinos, Efthymios D; Chaer, Rabih A; Naddaf, Abdallah; El-Shazly, Omar M; Marone, Luke; Makaroun, Michel S

    2016-09-01

    Primary closure after carotid endarterectomy (CEA) has been much maligned as an inferior technique with worse outcomes than in patch closure. Our purpose was to compare perioperative and long-term results of different CEA closure techniques in a large institutional experience. A consecutive cohort of CEAs between January 1, 2000, and December 31, 2010, was retrospectively analyzed. Closure technique was used to divide patients into three groups: primary longitudinal arteriotomy closure (PRC), patch closure (PAC), and eversion closure (EVC). End points were perioperative events, long-term strokes, and restenosis ≥70%. Multivariate regression models were used to assess the effect of baseline predictors. There were 1737 CEA cases (bilateral, 143; mean age, 71.4 ± 9.3 years; 56.2% men; 35.3% symptomatic) performed during the study period with a mean clinical follow-up of 49.8 ± 36.4 months (range, 0-155 months). More men had primary closure, but other demographic and baseline symptoms were similar between groups. Half the patients had PAC, with the rest evenly distributed between PRC and EVC. The rate of nerve injury was 2.7%, the rate of reintervention for hematoma was 1.5%, and the length of hospital stay was 2.4 ± 3.0 days, with no significant differences among groups. The combined stroke and death rate was 2.5% overall and 3.9% and 1.7% in the symptomatic and asymptomatic cohort, respectively. Stroke and death rates were similar between groups: PRC, 11 (2.7%); PAC, 19 (2.2%); EVC, 13 (2.9%). Multivariate analysis showed baseline symptomatic disease (odds ratio, 2.4; P = .007) and heart failure (odds ratio, 3.1; P = .003) as predictors of perioperative stroke and death, but not the type of closure. Cox regression analysis demonstrated, among other risk factors, no statin use (hazard ratio, 2.1; P = .008) as a predictor of ipsilateral stroke and severe (glomerular filtration rate <30 mL/min/1.73 m(2)) renal insufficiency (hazard ratio, 2.6; P

  14. Technical data summary: Plan for closure of the 643-G burial ground

    International Nuclear Information System (INIS)

    Cook, J.R.

    1987-01-01

    This report involves the actions of closing the 643-G burial ground which involves waste removal, stabilization, and capping. Remedial action involves the removing of the transuranic waste and closing of the grid wells. The closure cap for the burial site will consist of native soil, clay, and gravel. This will assure long-term physical and chemical stability. (MB)

  15. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides the 2006 cap inspection results.

  16. The influence of spirituality and religiosity on breast cancer screening delay in African American women: application of the Theory of Reasoned Action and Planned Behavior (TRA/TPB).

    Science.gov (United States)

    Gullate, Mary

    2006-01-01

    African American women (AAW) are 25% more likely to present with late stage breast cancer and 20% more likely to die from their disease than Caucasian women. Researchers report that a treatment delay of 3 months is a significant factor in breast cancer mortality. Socioeconomic factors, lack of access and knowledge, spiritual and religious beliefs, fear and fatalism are reported as contributing factors to screening delays. Studies have primarily applied the Health Belief Model (HBM) and modified versions like the Champion HBM to preventive health practices. Neither have significant inclusion of spirituality or religiosity. The TRA/TPB focus on beliefs, intent and attitude as individual determinants of the likelihood of performing a specific behavior; but have not had wide utility in studies related to screening delays among AAW. This paper explores the utility of applying the TRA/TPB as the theoretical framework for determining cultural relevance of spirituality and religiosity to screening delays among AAW.

  17. Criticality assessment of LLRWDF closure

    International Nuclear Information System (INIS)

    Sarrack, A.G.; Weber, J.H.; Woody, N.D.

    1992-01-01

    During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of the LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted

  18. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  20. Phase 1 sampling and analysis plan for the 304 Concretion Facility closure activities

    International Nuclear Information System (INIS)

    Adler, J.G.

    1994-01-01

    This document provides guidance for the initial (Phase 1) sampling and analysis activities associated with the proposed Resource Conservation and Recovery Act of 1976 (RCRA) clean closure of the 304 Concretion Facility. Over its service life, the 304 Concretion Facility housed the pilot plants associated with cladding uranium cores, was used to store engineering equipment and product chemicals, was used to treat low-level radioactive mixed waste, recyclable scrap uranium generated during nuclear fuel fabrication, and uranium-titanium alloy chips, and was used for the repackaging of spent halogenated solvents from the nuclear fuels manufacturing process. The strategy for clean closure of the 304 Concretion Facility is to decontaminate, sample (Phase 1 sampling), and evaluate results. If the evaluation indicates that a limited area requires additional decontamination for clean closure, the limited area will be decontaminated, resampled (Phase 2 sampling), and the result evaluated. If the evaluation indicates that the constituents of concern are below action levels, the facility will be clean closed. Or, if the evaluation indicates that the constituents of concern are present above action levels, the condition of the facility will be evaluated and appropriate action taken. There are a total of 37 sampling locations comprising 12 concrete core, 1 concrete chip, 9 soil, 11 wipe, and 4 asphalt core sampling locations. Analysis for inorganics and volatile organics will be performed on the concrete core and soil samples. Separate concrete core samples will be required for the inorganic and volatile organic analysis (VOA). Analysis for inorganics only will be performed on the concrete chip, wipe, and asphalt samples

  1. Joint Cross-Service Group for Laboratories 1995 Defense Base Realignment and Closure Process

    National Research Council Canada - National Science Library

    Reed, Donald

    1995-01-01

    This report is one in a series of reports that discusses the Joint Cross-Service Group implementation of the internal control plan developed by the 1995 Defense Base Closure and Realignment Steering Group (the Steering Group...

  2. The impact of hospital closures on geographical access: Evidence from four southeastern states of the United States

    Directory of Open Access Journals (Sweden)

    M.L. Burkey

    Full Text Available This paper examines the effects of hospital closures on geographical access by potential patients, using data from four southeastern U.S. states. Using optimization models designed to minimize the adverse effects of hospital closures, extensive computations are performed and the results are discussed. The effects of the closures on the rural areas is also investigated. Finally, the paper determines which hospitals are most likely among those to be closed assuming that up to 10% of the existing hospitals in each of the four states were to be shut down. The overall conclusion of the empirical findings is that while differences exist among the states, efficiency, coverage, and equality measures for geographical access do not suffer significantly if only a few hospitals are closed in each state, provided these closures are done optimally to minimize impact. Further, for efficiency objectives, decision makers can follow a sequential strategy for closures and still be guaranteed optimality. The paper also discusses the effects of hospital closures on equity and it examines whether or not rural areas are disproportionately affected by closures. Keywords: Health care, Access to health care, Proximity, Hospital closures, Location problems, Facility planning

  3. ART, Stoffenmanager, and TRA: A Systematic Comparison of Exposure Estimates Using the TREXMO Translation System.

    Science.gov (United States)

    Savic, Nenad; Gasic, Bojan; Vernez, David

    2017-12-15

    Several occupational exposure models are recommended under the EU's REACH legislation. Due to limited availability of high-quality exposure data, their validation is an ongoing process. It was shown, however, that different models may calculate significantly different estimates and thus lead to potentially dangerous conclusions about chemical risk. In this paper, the between-model translation rules defined in TREXMO were used to generate 319000 different in silico exposure situations in ART, Stoffenmanager, and ECETOC TRA v3. The three models' estimates were computed and the correlation and consistency between them were investigated. The best correlated pair was Stoffenmanager-ART (R, 0.52-0.90), whereas the ART-TRA and Stoffenmanager-TRA correlations were either lower (R, 0.36-0.69) or no correlation was found. Consistency varied significantly according to different exposure types (e.g. vapour versus dust) or settings (near-field versus far-field and indoors versus outdoors). The percentages of generated situations for which estimates differed by more than a factor of 100 ranged from 14 to 97%, 37 to 99%, and 1 to 68% for Stoffenmanager-ART, TRA-ART, and TRA-Stoffenmanager, respectively. Overall, the models were more consistent for vapours than for dusts and solids, near-fields than for far-fields, and indoor than for outdoor exposure. Multiple linear regression analyses evidenced the relationship between the models' parameters and the relative differences between the models' predictions. The relative difference can be used to estimate the consistency between the models. Furthermore, the study showed that the tiered approach is not generally applicable to all exposure situations. These findings emphasize the need for a multiple-model approach to assessing critical exposure scenarios under REACH. Moreover, in combination with occupational exposure measurements, they might also be used for future studies to improve prediction accuracy. © The Author(s) 2017

  4. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit[CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV-284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C

  5. Ring closure in actin polymers

    Energy Technology Data Exchange (ETDEWEB)

    Sinha, Supurna, E-mail: supurna@rri.res.in [Raman Research Institute, Bangalore 560080 (India); Chattopadhyay, Sebanti [Doon University, Dehradun 248001 (India)

    2017-03-18

    We present an analysis for the ring closure probability of semiflexible polymers within the pure bend Worm Like Chain (WLC) model. The ring closure probability predicted from our analysis can be tested against fluorescent actin cyclization experiments. We also discuss the effect of ring closure on bend angle fluctuations in actin polymers. - Highlights: • Ring closure of biopolymers. • Worm like chain model. • Predictions for experiments.

  6. Patient Satisfaction After Femoral Arterial Access Site Closure Using the ExoSeal® Vascular Closure Device Compared to Manual Compression: A Prospective Intra-individual Comparative Study

    International Nuclear Information System (INIS)

    Pieper, Claus Christian; Thomas, Daniel; Nadal, Jennifer; Willinek, Winfried A.; Schild, Hans Heinz; Meyer, Carsten

    2016-01-01

    PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal ® vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal ® -VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)]. Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal ® -VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal ® use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general

  7. Estudo comparativo entre traços de argamassa de revestimento utilizadas em Porto Alegre

    OpenAIRE

    Eduardo Dubaj

    2000-01-01

    Existe hoje na construção civil uma grande variedade de traços de argamassa para revestimento. Estes traços são, muitas vezes, utilizados de maneira inadequada, não levando-se em consideração as solicitações a que estes revestimentos serão submetidos. Este uso inadequado é muitas vezes o responsável pelo surgimento de manifestações patológicas que conduzem a diminuição da vida útil de um componente ou de uma edificação como um todo, conduzindo a gastos com sua recuperação e até a total insati...

  8. TraLaLa Blip: Community Music for the Electronically Abled

    Science.gov (United States)

    Reimann, Randolf

    2012-01-01

    This article presents a personal reflection on the use of electronic music as a vehicle for community music in a disability setting. In order to do this, I draw on my experiences as the founder, facilitator, producer, tutor, sound artist and musician of TraLaLa Blip. I established the group in 2008, after having worked with people with…

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  10. OSSERVAZIONI SU UNO SCAMBIO DI POEMETTI TRA PIETRO STANCOVICH E MARTINO FIORANTI

    Directory of Open Access Journals (Sweden)

    Sandro Cergna

    2013-01-01

    Full Text Available Il lavoro presenta un’analisi comparata tra due poemetti d’occasione in dialetto istroveneto dell’Istria sud-occidentale. I componimenti, scritti nel 1826 dal dignanese Martino Fioranti e dal canonico di Barbana Pietro Stancovich, rappresentano un’importante attestazione della presenza di un’attività poetica in quella che rappresentava all’epoca la koiné del territorio istriano, cioè l’idioma di diretta derivazione veneziana. I poemetti rivestono scarsa importanza a livello letterario. Più interessanti si rivelano, invece, se osservati da una prospettiva storica e documentaristica, attraverso la quale ci si svela l’ambiente, il costume dell’epoca, e soprattutto il rapporto di cordiale amicizia che univa i due poeti. In chiusura del lavoro si dà un breve confronto tra il poemetto e i tre sonetti di Martino Fioranti, rinvenuti nell’archivio della Biblioteca universitaria di Pola.

  11. Tubular closure device

    International Nuclear Information System (INIS)

    Klahn, F.C.; Nolan, J.H.; Wills, C.

    1982-01-01

    This invention relates to a closure mechanism for closing openings such as the bore of a conduit and for releasably securing members within the bore. More particularly, this invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holders used in nuclear reactors

  12. Work life balance tra limiti istituzionali e pratiche innovative

    Directory of Open Access Journals (Sweden)

    Giovanna Campanella

    2017-12-01

    Full Text Available Come rispondono le politiche di conciliazione cura-lavoro alle esigenze delle lavoratrici e dei lavoratori di nuova generazione: sempre più precari, poveri e instabili dal punto di vista reddituale e/o professionale? Con un sostanziale immobilismo politico.  Questo è il quadro che viene fuori da una rassegna delle principali politiche sociali italiane volte a supporto della genitorialità e alla garanzia dell’occupazione femminile. Il contributo mette in luce i limiti di tali politiche e coglie gli aspetti innovativi di pratiche che si sviluppano dal basso.  Al contempo, una riflessione al margine lascia aperta una importante questione sul rapporto tra flessibilità e conciliazione, ovvero tra organizzazione del lavoro e tempi di cura per la famiglia. Nell’era della rivoluzione digitale,  individuamo forti resistenze al cambiamento, sia da parte delle istituzioni, ma anche e soprattutto dal mondo produttivo, che vanta si modelli “agili” di forme di lavoro da un punto di vista formale (vedi il lavoro agile/ smart working ma che dal punto di vista sostanziale rimane radicato a modelli di contrattazione standar che non agevola né la condizioine lavorativa da un punto di vista di tutele né la conciliaizone cura lavoro e quindi l’occupazione femminile.

  13. Unique Helicase Determinants in the Essential Conjugative TraI Factor from Salmonella enterica Serovar Typhimurium Plasmid pCU1

    Energy Technology Data Exchange (ETDEWEB)

    McLaughlin, Krystle J.; Nash, Rebekah P.; Redinbo, Mathew R. (UNC)

    2014-06-16

    The widespread development of multidrug-resistant bacteria is a major health emergency. Conjugative DNA plasmids, which harbor a wide range of antibiotic resistance genes, also encode the protein factors necessary to orchestrate the propagation of plasmid DNA between bacterial cells through conjugative transfer. Successful conjugative DNA transfer depends on key catalytic components to nick one strand of the duplex DNA plasmid and separate the DNA strands while cell-to-cell transfer occurs. The TraI protein from the conjugative Salmonella plasmid pCU1 fulfills these key catalytic roles, as it contains both single-stranded DNA-nicking relaxase and ATP-dependent helicase domains within a single, 1,078-residue polypeptide. In this work, we unraveled the helicase determinants of Salmonella pCU1 TraI through DNA binding, ATPase, and DNA strand separation assays. TraI binds DNA substrates with high affinity in a manner influenced by nucleic acid length and the presence of a DNA hairpin structure adjacent to the nick site. TraI selectively hydrolyzes ATP, and mutations in conserved helicase motifs eliminate ATPase activity. Surprisingly, the absence of a relatively short (144-residue) domain at the extreme C terminus of the protein severely diminishes ATP-dependent strand separation. Collectively, these data define the helicase motifs of the conjugative factor TraI from Salmonella pCU1 and reveal a previously uncharacterized C-terminal functional domain that uncouples ATP hydrolysis from strand separation activity.

  14. Patient Satisfaction After Femoral Arterial Access Site Closure Using the ExoSeal{sup ®} Vascular Closure Device Compared to Manual Compression: A Prospective Intra-individual Comparative Study

    Energy Technology Data Exchange (ETDEWEB)

    Pieper, Claus Christian, E-mail: claus.christian.pieper@ukb.uni-bonn.de; Thomas, Daniel, E-mail: daniel.thomas@ukb.uni-bonn.de [University of Bonn, Department of Radiology (Germany); Nadal, Jennifer, E-mail: jennifer.nadal@ukb.uni-bonn.de [University of Bonn, Institute for Medical Biometry, Informatics and Epidemiology (Germany); Willinek, Winfried A., E-mail: w.willinek@bk-trier.de; Schild, Hans Heinz, E-mail: hans.schild@ukb.uni-bonn.de; Meyer, Carsten, E-mail: carsten.meyer@ukb.uni-bonn.de [University of Bonn, Department of Radiology (Germany)

    2016-01-15

    PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal{sup ®} vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal{sup ®}-VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)]. Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal{sup ®}-VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal{sup ®} use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general.

  15. CIRSE Vascular Closure Device Registry

    NARCIS (Netherlands)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. The CIRSE registry of closure devices

  16. Agreement reached at Unilever after three-week strike over plant closures

    NARCIS (Netherlands)

    Grünell, M.

    2008-01-01

    In mid October 2007, staff at the Unilever plant in the Netherlands went on strike for over three weeks in protest against the group’s plan to close three of the country’s six Unilever plants. The trade unions believe that the closures are unnecessary and are calling for job guarantees for employees

  17. Closure Report Central Nevada Test Area Subsurface Corrective Action Unit 443 January 2016

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [US Department of Energy, Washington, DC (United States). Office of Legacy Management

    2015-11-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Closure Report for the subsurface Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA), Nevada, Site. CNTA was the site of a 0.2- to 1-megaton underground nuclear test in 1968. Responsibility for the site’s environmental restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended 2011) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. This Closure Report provides justification for closure of CAU 443 and provides a summary of completed closure activities; describes the selected corrective action alternative; provides an implementation plan for long-term monitoring with well network maintenance and approaches/policies for institutional controls (ICs); and presents the contaminant, compliance, and use-restriction boundaries for the site.

  18. Economic and financial aspects of mine closure

    International Nuclear Information System (INIS)

    Kahn, James R.; Franceschi, Dina; Curi, Adilson; Vale, Eduardo

    2001-01-01

    Today, mine reclamation is a key component to a successful mine plan. Most of the industrialized nations have recognized the need to make mining activities relatively environmentally friendly, if they want to continue to benefit from the economic gains from mineral resource development. Countries such as the United States, Canada, Australia and South Africa are leaders in the field and have implemented relatively sophisticated legislation to ensure environmentally correct mine closure. These countries rely on a combination of strict control strategies and economic penalties to ensure compliance. Yet, from the firm's perspective, reclamation activities are counterproductive as they cut into properties. In order to attract economic development and earn much needed economic capital, most of the rest of the world, particularly the developing countries, lack effective mine closure legislation. The traditional command and control type of legislation that is sometimes used is either vague and therefore avoided, or not enforced appropriately, resulting in an undesirable level of environmental degradation. With the use of case studies from Brazil, this article shows that direct controls are effective in some instances and not in others. It proposes that economic and financial tools may be more effective than the traditional direct controls in getting firms to comply with environmental standards, particularly in developing countries where environmental compliance is more difficult to achieve. It explains the use of performance bonding as one type of economic incentive that has proven to be an effective environmental policy in mine planning and closure. The authors additionally push beyond the typical style of performance bonds to introduce a flexible bonding and insurance system that allows governments to maintain strict environmental standards but limits firms financial exposure during the mining process. Such a system learns from the successes of the industrialized

  19. Candidate Essential Genes in Burkholderia cenocepacia J2315 Identified by Genome-Wide TraDIS

    KAUST Repository

    Wong, Yee-Chin

    2016-08-22

    Burkholderia cenocepacia infection often leads to fatal cepacia syndrome in cystic fibrosis patients. However, antibiotic therapy rarely results in complete eradication of the pathogen due to its intrinsic resistance to many clinically available antibiotics. Recent attention has turned to the identification of essential genes as the proteins encoded by these genes may serve as potential targets for development of novel antimicrobials. In this study, we utilized TraDIS (Transposon Directed Insertion-site Sequencing) as a genome-wide screening tool to facilitate the identification of B. cenocepacia genes essential for its growth and viability. A transposon mutant pool consisting of approximately 500,000 mutants was successfully constructed, with more than 400,000 unique transposon insertion sites identified by computational analysis of TraDIS datasets. The saturated library allowed for the identification of 383 genes that were predicted to be essential in B. cenocepacia. We extended the application of TraDIS to identify conditionally essential genes required for in vitro growth and revealed an additional repertoire of 439 genes to be crucial for B. cenocepacia growth under nutrient-depleted conditions. The library of B. cenocepacia mutants can subsequently be subjected to various biologically related conditions to facilitate the discovery of genes involved in niche adaptation as well as pathogenicity and virulence.

  20. Candidate Essential Genes in Burkholderia cenocepacia J2315 Identified by Genome-Wide TraDIS

    KAUST Repository

    Wong, Yee-Chin; Abd El Ghany, Moataz; Naeem, Raeece; Lee, Kok-Wei; Tan, Yung-Chie; Pain, Arnab; Nathan, Sheila

    2016-01-01

    Burkholderia cenocepacia infection often leads to fatal cepacia syndrome in cystic fibrosis patients. However, antibiotic therapy rarely results in complete eradication of the pathogen due to its intrinsic resistance to many clinically available antibiotics. Recent attention has turned to the identification of essential genes as the proteins encoded by these genes may serve as potential targets for development of novel antimicrobials. In this study, we utilized TraDIS (Transposon Directed Insertion-site Sequencing) as a genome-wide screening tool to facilitate the identification of B. cenocepacia genes essential for its growth and viability. A transposon mutant pool consisting of approximately 500,000 mutants was successfully constructed, with more than 400,000 unique transposon insertion sites identified by computational analysis of TraDIS datasets. The saturated library allowed for the identification of 383 genes that were predicted to be essential in B. cenocepacia. We extended the application of TraDIS to identify conditionally essential genes required for in vitro growth and revealed an additional repertoire of 439 genes to be crucial for B. cenocepacia growth under nutrient-depleted conditions. The library of B. cenocepacia mutants can subsequently be subjected to various biologically related conditions to facilitate the discovery of genes involved in niche adaptation as well as pathogenicity and virulence.

  1. Vestite alla turchesca. Travestimenti orientali nella drammaturgia italiana e francese tra Sei e Settecento

    Directory of Open Access Journals (Sweden)

    Stefano Agostino Moretti

    2011-11-01

    Full Text Available Da secoli il Mar Mediterraneo rappresenta un confine tra due mondi. Gli orientalisti li chiamavano e continuano a chiamarli mondo “arabo” e mondo “cristiano”. Questo contributo vuole mostrare come, in tempi non sospetti, l’Italia rappresentasse un ponte tra queste due culture. Grazie agli strumenti della storiografia contemporanea, attenta alla vita quotidiana e agli “archivi del corpo”, scopriamo che durante il XVI e il XVII secolo gli incontri tra musulmani e cristiani fossero molto frequenti e spesso felici. Il teatro comico italiano fu il genere letterario che, prima e meglio di ogni altro, riuscì a cogliere e a descrivere tale fenomeno con tutte le implicazioni politiche, religiose e identitarie, restituendone in pieno uno degli elementi sovente sottaciuti e censurati, ovvero la perturbante carica erotica del “diverso”. Uno degli espedienti che riassumono con maggiore efficacia questo  rapporto identitario e culturale è rappresentato dall’uso del travestimento. Paragonando alcune commedie italiane della prima metà del Seicento con il teatro “orientalista” di Bonarelli, Molière e Goldoni, possiamo osservare la nascita e la crescita di una visione stereotipata e libresca dell’altro, là dove i “panni turcheschi” generavano negli spettatori paura e desiderio.

  2. Candidate essential genes in Burkholderia cenocepacia J2315 identified by genome-wide TraDIS

    Directory of Open Access Journals (Sweden)

    Yee-Chin Wong

    2016-08-01

    Full Text Available Burkholderia cenocepacia infection often leads to fatal cepacia syndrome in cystic fibrosis patients. However, antibiotic therapy rarely results in complete eradication of the pathogen due to its intrinsic resistance to many clinically available antibiotics. Recent attention has turned to the identification of essential genes as the proteins encoded by these genes may serve as potential targets for development of novel antimicrobials. In this study, we utilized TraDIS (Transposon Directed Insertion-site Sequencing as a genome-wide screening tool to facilitate the identification of B. cenocepacia genes essential for its growth and viability. A transposon mutant pool consisting of approximately 500,000 mutants was successfully constructed, with more than 400,000 unique transposon insertion sites identified by computational analysis of TraDIS datasets. The saturated library allowed for the identification of 383 genes that were predicted to be essential in B. cenocepacia. We extended the application of TraDIS to identify conditionally essential genes required for in vitro growth and revealed an additional repertoire of 439 genes to be crucial for B. cenocepacia growth under nutrient-depleted conditions. The library of B. cenocepacia mutants can subsequently be subjected to various biologically related conditions to facilitate the discovery of genes involved in niche adaptation as well as pathogenicity and virulence.

  3. ‘Tarasca’. Tra Napoli, Venezia e l’Europa

    Directory of Open Access Journals (Sweden)

    Piermario Vescovo

    2014-12-01

    Full Text Available This paper reconsiders some important episodes of the history of drama and theater of the imagination spread between Naples and Madrid or more generally between Italy and Spain with reference to the Tarasca (procession of Corpus Domini, ideally through six ‘stations’. In this Spanish procession we find on a female dragon the effigies of Gennaro and Gaetano Sacchi, uncle and father of the more famous Antonio, whose stories and travels are one of the matters of this paper. The other matters are focused on the relationship between Carlo Goldoni and the Neapolitans Domenico Barone and Domenico Lalli, and on the Venetian reinvention of Pulcinella’s mask by Giandomenico Tiepolo, passing through Madrid.Col riferimento a una processione legata prevalentemente al Corpus Domini, attraverso sei ‘stazioni’ ideali, il contributo riconsidera alcuni rilevanti episodi di storia dello spettacolo e di diffusione dell’immaginazione teatrale tra Napoli e Madrid, o più in generale tra l’Italia e la Spagna. Nella processione madrilena – sopra un drago femmina semovente (la Tarasca, appunto – si ritrovano le effigi di Gennaro e Gaetano Sacchi, zio e padre del più celebre Antonio, le cui vicende e le cui peregrinazioni costituiscono il filo principale del racconto; gli altri sono costituiti dai rapporti di Carlo Goldoni coi napoletani Domenico Barone e Domenico Lalli e dalla reinvenzione veneziana – passando per Madrid – della maschera di Pulcinella da parte di Giandomenico Tiepolo.

  4. Le Kāmasūtra et la « pulsion shastrique » en Inde

    OpenAIRE

    Naudou, Elizabeth

    2013-01-01

    Le mot « shastrique » fait référence au traité (śāstra) d’où sont issus les Kāmasūtra, (plus généralement appelé le Kāmasūtra), « aphorismes sur l’amour » : le Kāmaśāstra, « traité sur l’amour ». Qui dit śāstra, dit, en Inde, exposé religieux ou scientifique, d’où l’expression « pulsion shastrique » que l’on pourrait rendre par « pulsion encyclopédique énumérative et classificatoire ». Le but de cet exposé est de replacer le texte dans cette structure mentale typiquement indienne, qui reflète...

  5. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-03-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to October 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the

  6. Uso de inseticidas para o controle da traça-do-tomateiro e traça-das-crucíferas: um estudo de caso Use of insecticides for controlling the South American Tomato Pinworm and the Diamondback Moth: a case study

    Directory of Open Access Journals (Sweden)

    Marina Castelo Branco

    2001-03-01

    Full Text Available Em agosto de 1999, produtores de tomate e brássicas do Núcleo Rural da Taquara tiveram seus cultivos seriamente comprometidos devido à impossibilidade de controle da traça-do-tomateiro e da traça-das-crucíferas. Diversos inseticidas, alguns com o mesmo princípio ativo ou pertencentes ao mesmo grupo químico, eram aplicados de uma a sete vezes por semana sem qualquer eficiência no controle das pragas. Lavouras foram abandonadas em diferentes estádios de desenvolvimento. A fim de definir uma estratégia de controle que viabilizasse a produção de tomate e brássicas na região, foi avaliado em laboratório a eficiência da dose comercial de alguns inseticidas usados no controle das duas pragas. Para isso, foram coletadas duas populações de traça-do-tomateiro e uma população de traça-das-crucíferas. Para traça-do-tomateiro, cartap, abamectin, lufenuron, acefate e deltametrina causaram respectivamente 100, 90, 67, 2 e 0% de mortalidade das larvas. Para traça-das-crucíferas, B. thuringiensis, abamectin, cartap, acefate and deltametrina causaram 100; 96; 86; 79 e 5% de mortalidade respectivamente. De acordo com estes resultados foi recomendada a suspensão imediata do uso de piretróides e organofosforados para o controle das duas pragas. Abamectin e cartap foram recomendados para o controle da traça-do-tomateiro e B. thuringiensis para o controle de traça-das-crucíferas.In August 1999, at the "Núcleo Rural da Taquara", Federal District, Brazil, tomato and brassica crops were severely damaged by the South American Tomato Pinworm (Tuta absoluta and the Diamondback Moth (Plutella xylostella. During that time growers related that they had been spraying insecticides one to seven times per week without controlling the pests. In the fields it was observed that there were crops with different ages and levels of chemical residues which allowed the pests to multiplicate continuously. Then it was decided that the first step to solve the

  7. Openings and closures in the environmental planning horizon

    DEFF Research Database (Denmark)

    Vasström, Mikaela Lise

    boundary setting, risk assessment, and interest negotiation. Participatory nature protection planning is not only a question of procedural legitimacy, but also a matter of deliberating different nature-society rationalities in order to improve the substantial ground for environmental planning trajectories......Sustainability is one of the most pressing concerns in our modern society. Nature protection or environmental planning can be understood as one societal answer to some of the ecological challenges of our “developed” society to secure particular nature values and areas. The regulation of nature......, however, also affects socio-economic and cultural aspects, and creates contested claims between different types of nature values and interests. Current environmental planning has proved to generate conflict in relation to a wide variety of knowledge, steering, interest, and value facets between national...

  8. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  10. Integrating Shared Mobility into Multimodal Transportation Planning: Improving Regional Performance to Meet Public Goals

    Science.gov (United States)

    2018-02-01

    New shared mobility services have become increasingly common and important modes of travel in U.S. cities, but transportation planning practices are only beginning to adapt in response. This white paper provides a framework and examples to assist tra...

  11. Delayed primary closure of bladder exstrophy: immediate postoperative management leading to successful outcomes.

    Science.gov (United States)

    Baradaran, Nima; Stec, Andrew A; Schaeffer, Anthony J; Gearhart, John P; Mathews, Ranjiv I

    2012-02-01

    To present the critical features of our postoperative plan for children undergoing delayed primary bladder closure because appropriate postoperative management is crucial to successful exstrophy repair. Using an institutionally approved database, patients with bladder exstrophy whose primary bladder closure was performed at least 1 month after birth were identified. All aspects of the postoperative management were reviewed. A total of 20 patients (18 boys) were identified: 19 with classic bladder extrosphy and 1 with an exstrophy variant. The patients underwent closure at a mean age of 9.9 months. All patients underwent pelvic osteotomy and immobilization for an average of 34.8 days. Analgesia was administered by way of a tunneled epidural catheter in 90% of patients for an average of 18.8 days, and 12 patients (60%) required adjunct intravenous analgesia. Bilateral ureteral catheters and suprapubic tubes were used in all patients. Total parenteral nutrition was administered to 10 (83%) of 12 patients who underwent closure after 2000. All patients received preoperative antibiotics and 2 weeks of postoperative intravenous antibiotics that was followed by oral prophylaxis. The mean hospital stay was 6.3 weeks. With an average follow-up of 7.4 years, delayed closure was 100% successful. Successful delayed primary closure of bladder exstrophy requires a multidisciplinary approach. The keys to success include osteotomy, pelvic immobilization, analgesia, nutritional support, maximal bladder drainage, and infection prophylaxis. Copyright © 2012. Published by Elsevier Inc.

  12. Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit[CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C

  13. Observations on early and delayed colostomy closure.

    Science.gov (United States)

    Tade, A O; Salami, B A; Ayoade, B A

    2011-06-01

    Traditional treatment of a variety of colorectal pathologies had included a diverting colostomy that was closed eight or more weeks later during a readmission. The aim of this retrospective study was to determine the outcomes of early colostomy closure and delayed colostomy closure in patients with temporary colostomies following traumatic and non-traumatic colorectal pathologies. In this study early colostomy closure was the closure of a colostomy within three weeks of its construction, while delayed colostomy closure referred to closure after 3 weeks. Complete records of the 37 adult patients who had temporary colostomy constructed and closed between Jan. 1997 December 2003 for various colorectal pathologies were studied. Fourteen patients had early colostomy closure while 23 had delayed closure. In the early colostomy closure group there were 10 men and 4 women. The mean age of the patients was 28yr with a range of 18-65yr. Colostomies were closed 9-18 days after initial colostomy construction. There was no mortality. Morbidity rate 28.6% (4 out of 14). There were two faecal fistulas (14.3%). Twenty-three patients had delayed colostomy closure 8 weeks to 18 months after initial colostomy construction. These were patients unfit for early surgery after initial colostomy construction because of carcinoma, significant weight loss, or sepsis. There was no mortality. Morbidity rate was 26.1%. There were 3 faecal fistulas (13.2%). Outcomes following early colostomy closure and delayed closure were comparable. Patients fit for surgery should have early closure whilst patients who may have compromised health should have delayed closure.

  14. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  15. Review of Analytes of Concern and Sample Methods for Closure of DOE High Level Waste Storage Tanks

    International Nuclear Information System (INIS)

    Thomas, T.R.

    2002-01-01

    Sampling residual waste after tank cleaning and analysis for analytes of concern to support closure and cleaning targets of large underground tanks used for storage of legacy high level radioactive waste (HLW) at Department of Energy (DOE) sites has been underway since about 1995. The DOE Tanks Focus Area (TFA) has been working with DOE tank sites to develop new sampling plans, and sampling methods for assessment of residual waste inventories. This paper discusses regulatory analytes of concern, sampling plans, and sampling methods that support closure and cleaning target activities for large storage tanks at the Hanford Site, the Savannah River Site (SRS), the Idaho National Engineering and Environmental Laboratory (INEEL), and the West Valley Demonstration Project (WVDP)

  16. Sternal exploration or closure

    Science.gov (United States)

    VAC - vacuum-assisted closure - sternal wound; Sternal dehiscence; Sternal infection ... in the wound to look for signs of infection Remove dead or infected ... use a VAC (vacuum-assisted closure) dressing. It is a negative ...

  17. The benefits of a critical stance: a reflection on past papers on the theories of reasoned action and planned behaviour.

    Science.gov (United States)

    Manstead, Antony S R

    2011-09-01

    In this paper, I reflect on past papers published in the British Journal of Social Psychology (BJSP) that have played a role in the development of the theory of reasoned action (TRA) and the theory of planned behaviour (TPB). I focus on seven papers that fall into five categories: (1) those that critique the TRA/TPB for taking insufficient account of social factors; (2) those that critique the models on the grounds that many social behaviours are 'habitual'; (3) those that critically examine the construct of perceived behavioural control; (4) those that argue for the importance of affective factors, which appear to be overlooked in the TRA/TPB; and (5) those that argue for the importance of studying the role of moderating factors and interaction effects in the TRA/TPB. I conclude that BJSP's traditional focus on criticism and theory development is one that benefits the journal and the field. ©2011 The British Psychological Society.

  18. Full closure strategic analysis.

    Science.gov (United States)

    2014-07-01

    The full closure strategic analysis was conducted to create a decision process whereby full roadway : closures for construction and maintenance activities can be evaluated and approved or denied by CDOT : Traffic personnel. The study reviewed current...

  19. Indigenous Engagement in Tropical River Research in Australia: The TRaCK Program

    Directory of Open Access Journals (Sweden)

    Sue E. Jackson

    2015-05-01

    Full Text Available The literature on scientific-Indigenous ecological knowledge collaborations rarely analyses programmatic efforts undertaken by multi-disciplinary research groups over very large geographic scales. The TRaCK (Tropical Rivers and Coastal Knowledge research program was established to provide the science and knowledge needed by governments, industries, and communities to sustainably manage northern Australia’s rivers and estuaries. A number of policies and procedures were developed to ensure that the needs of Indigenous people of the multi-jurisdictional region were addressed and to enhance the benefits they might derive from participating in the research. An overarching Indigenous Engagement Strategy undergirded the program’s engagement activities, providing guidance on matters relating to the protection of intellectual property, negotiation of research agreements, remuneration for Indigenous expertise, and communications standards. This article reviews the achievements and shortcomings of the TRaCK experience of Indigenous engagement and highlights lessons for researchers and research organisations contemplating applied environmental science initiatives of this scale and scope.

  20. Crack closure, a literature study

    Science.gov (United States)

    Holmgren, M.

    1993-08-01

    In this report crack closure is treated. The state of the art is reviewed. Different empirical formulas for determining the crack closure are compared with each other, and their benefits are discussed. Experimental techniques for determining the crack closure stress are discussed, and some results from fatigue tests are also reported. Experimental data from the literature are reported.

  1. Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-07-17

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 547 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 547 consists of the following three Corrective Action Sites (CASs), located in Areas 2, 3, and 9 of the Nevada National Security Site: (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; AND (3) CAS 09-99-06, Gas Sampling Assembly Closure activities began in August 2011 and were completed in June 2012. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 547 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The recommended corrective action for the three CASs in CAU 547 was closure in place with administrative controls. The following closure activities were performed: (1) Open holes were filled with concrete; (2) Steel casings were placed over vertical expansion joints and filled with cement; (3) Engineered soil covers were constructed over piping and exposed sections of the gas sampling system components; (4) Fencing, monuments, Jersey barriers, radiological postings, and use restriction (UR) warning signs were installed around the perimeters of the sites; (5) Housekeeping debris was picked up from around the sites and disposed; and (6) Radiological surveys were performed to confirm final radiological postings. UR documentation is included in Appendix D. The post-closure plan was presented in detail in the CADD/CAP for CAU 547 and is included as

  2. Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2012-01-01

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 547 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 547 consists of the following three Corrective Action Sites (CASs), located in Areas 2, 3, and 9 of the Nevada National Security Site: (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; AND (3) CAS 09-99-06, Gas Sampling Assembly Closure activities began in August 2011 and were completed in June 2012. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 547 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The recommended corrective action for the three CASs in CAU 547 was closure in place with administrative controls. The following closure activities were performed: (1) Open holes were filled with concrete; (2) Steel casings were placed over vertical expansion joints and filled with cement; (3) Engineered soil covers were constructed over piping and exposed sections of the gas sampling system components; (4) Fencing, monuments, Jersey barriers, radiological postings, and use restriction (UR) warning signs were installed around the perimeters of the sites; (5) Housekeeping debris was picked up from around the sites and disposed; and (6) Radiological surveys were performed to confirm final radiological postings. UR documentation is included in Appendix D. The post-closure plan was presented in detail in the CADD/CAP for CAU 547 and is included as

  3. AA.VV., La Giustizia nella Letteratura e nello Spettacolo Siciliani tra ...

    African Journals Online (AJOL)

    User

    ruolo e i significati attribuiti al concetto di Giustizia nella. Letteratura e nello Spettacolo Siciliani tra '800 e '900. Da Verga a Sciascia costituisce il volume che raccoglie, a cura di Angelo. Zappulla, gli Atti del convegno su questo fondamentale tema. La centralità del tema Giustizia, nelle più diverse forme del fervore culturale ...

  4. Relação cinemática em um trator 4x2 com tração dianteira auxiliar equipado com pneus radiais na eficiência de tração Kinematic relation on radial tires in a front wheel assist tractor on traction efficience

    Directory of Open Access Journals (Sweden)

    Mauro Fernando Ferreira

    2000-12-01

    Full Text Available Diferentes combinações de pressões internas dos pneus do trator pode afetar a interferência entre eixos motrizes dos tratores agrícolas, principalmente com pneus do tipo radial. Um trator 4x2 com tração dianteira auxiliar foi analisado quanto a seu desempenho em tração. Pneus de carcaça radial com diferentes pressões internas foram utilizados, com o objetivo de variar as relações cinemá ticas entre os eixos. Mediram-se o patinamento das rodas dianteiras e traseiras, a resistência ao rolamento e a força de tração, em duas condições de solo (firme e solto. Os resultados obtidos permitiram verificar que a eficiência de tração não foi significativamente influenciada pela variação das relações cinemáticas de 0,962 a 1,102. As máximas eficiências de tração ocorreram com relaçõ es cinemáticas variáveis dentro da faixa estudada e de acordo com as cargas impostas à barra de tração.Different combinations of tractor tire inflating pressure may affect interference between tractor axles, mainly with radial tires type. A front wheel assist tractor was studied in its traction performance. Radial tires with different inflation pressure were used, changing kinematic relations between axles. The measured parameters were: front and rear slip, rolling resistence and drawbar pull in two soil conditions (firm and loose. The results indicate that traction efficience was not significantly influenced by kinematic relations variation between 0.962 to 1.102. The maximum traction efficiency ocurred within the range studied and according to drawbar pull.

  5. Scalp Wound Closure with K wires: An alternative easier method to scalp wound closure.

    Science.gov (United States)

    Ramesh, S; Ajik, S

    2012-12-01

    Scalp defects and lacerations present a reconstructive challenge to plastic surgeons. Many methods have been described from the use of skin grafting to rotation flaps. Here we present a method of closure of a contaminated scalp wound with the use of Kirschner wires. In our case, closure of scalp laceration was made possible with the use of 1.4 Kirschner wires and cable tie/ zip tie fasteners. The duration to closure of wound was 10 days. In reconstructing the scalp defect, this method was found to adhere to principles of scalp reconstruction. There were no post operative complications found from the procedure. On initial application on the edge of the wound, tension applied caused the K wires to cut through the wound edge. On replacement of K wires 1cm away from wound edge the procedure was not plagued by any further complication. In conclusion we find scalp closure with Kirschner wires are a simple and effective method for scalp wound closure.

  6. Revisit to Grad's Closure and Development of Physically Motivated Closure for Phenomenological High-Order Moment Model

    International Nuclear Information System (INIS)

    Myong, R. S.; Nagdewe, S. P.

    2011-01-01

    The Grad's closure for the high-order moment equation is revisited and, by extending his theory, a physically motivated closure is developed for the one-dimensional velocity shear gas flow. The closure is based on the physical argument of the relative importance of various terms appearing in the moment equation. Also, the closure is derived such that the resulting theory may be inclusive of the well established linear theory (Navier-Stokes-Fourier) as limiting case near local thermal equilibrium.

  7. Integrating scientific results for a post-closure safety demonstration

    International Nuclear Information System (INIS)

    Taylor, E.C.; Ramspott, L.D.; Sinnock, S.; Sprecher, W.M.

    1994-01-01

    The U.S. Department of Energy (DOE) is developing a nuclear waste management system that will accept high-level radioactive waste, transport it, store it, and ultimately emplace it in a deep geologic repository. The key activity now is determining whether Yucca Mountain, Nevada is suitable as a site for the repository. If so, the crucial technological advance will be the demonstration that disposal of nuclear waste will be safe for thousands of years after closure. Recent regulatory, legal, and scientific developments imply that the safety demonstration must be simple. The scientific developments taken together support a simple set of hypotheses that constitute a post-closure safety argument for a repository at Yucca Mountain. If the understanding of Yucca Mountain hydrology presented in the Site Characterization Plan proves correct, then these hypotheses might be confirmed by combining results of Surface-Based Testing with early testing results in the Exploratory Studies Facility

  8. Theory of reasoned action and theory of planned behavior-based dietary interventions in adolescents and young adults: a systematic review

    Directory of Open Access Journals (Sweden)

    Hackman CL

    2014-06-01

    Full Text Available Christine L Hackman, Adam P KnowldenDepartment of Health Science, The University of Alabama, Tuscaloosa, AL, USABackground: Childhood obesity has reached epidemic proportions in many nations around the world. The theory of planned behavior (TPB and the theory of reasoned action (TRA have been used to successfully plan and evaluate numerous interventions for many different behaviors. The aim of this study was to systematically review and synthesize TPB and TRA-based dietary behavior interventions targeting adolescents and young adults.Methods: The following databases were systematically searched to find articles for this review: Academic Search Premier; Cumulative Index to Nursing and Allied Health (CINAHL; Education Resources Information Center (ERIC; Health Source: Nursing/Academic Edition; Cochrane Central Register of Controlled Trials (CENTRAL; and MEDLINE. Inclusion criteria for articles were: 1 primary or secondary interventions, 2 with any quantitative design, 3 published in the English language, 4 between January 2003 and March 2014, 5 that targeted adolescents or young adults, 6 which included dietary change behavior as the outcome, and 7 utilized TPB or TRA.Results: Of the eleven intervention studies evaluated, nine resulted in dietary behavior change that was attributed to the treatment. Additionally, all but one study found there to be a change in at least one construct of TRA or TPB, while one study did not measure constructs. All of the studies utilized some type of quantitative design, with two employing quasi-experimental, and eight employing randomized control trial design. Among the studies, four utilized technology including emails, social media posts, information on school websites, web-based activities, audio messages in classrooms, interactive DVDs, and health-related websites. Two studies incorporated goal setting and four employed persuasive communication.Conclusion: Interventions directed toward changing dietary behaviors

  9. How the Lean Management System is Working on a Closure Project - 13242

    Energy Technology Data Exchange (ETDEWEB)

    Mowery, Carol [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  10. How the Lean Management System is Working on a Closure Project - 13242

    International Nuclear Information System (INIS)

    Mowery, Carol

    2013-01-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  11. A comparative test of the theory of reasoned action and the theory of planned behavior in the prediction of condom use intentions in a national sample of English young people.

    Science.gov (United States)

    Sutton, S; McVey, D; Glanz, A

    1999-01-01

    Based on the theories of reasoned action (TRA) and planned behavior (TPB), predictors of condom use intentions were investigated in 949 young people (16-24 years of age) from a national survey conducted in England. Contrary to expectations, the TPB did not perform significantly better than the TRA, even among women. Measures of past behavior were the best predictors of intentions and attenuated the effects of attitude and subjective norm. There was only weak evidence for the multiplicative assumption underlying the TRA and TPB. Although the TRA components were not the strongest predictors, the beliefs on which they are based are potentially amenable to change through information-based intervention programs. A number of practical suggestions for developing intervention strategies are offered.

  12. Tra ufficialità e Samizdat: Viktor Sosnora

    Directory of Open Access Journals (Sweden)

    Noemi Albanese

    2015-07-01

    Full Text Available La figura di Viktor Sosnora si presenta come una delle più particolari nel panorama letterario della Leningrado della seconda metà del Novecento. A metà tra mondo ufficiale e quello dell'underground, fu anche uno dei pochissimi autori ai quali, in epoca sovietica, fu concesso di viaggiare in Europa ed entrare in contatto con il mondo intellettuale coevo. La sua ricerca estetica e stilistica parte dalle tematiche antico russe per innovarle dall'interno grazie ad un gusto per la lingua estremamente contemporaneo;ciò si tradusse in sperimentazioni poetiche sempre più ardite che resero impossibile la pubblicazione ufficiale dei suoi testi, divenuti invece oggetto di culto negli ambienti del Samizdat.

  13. Site-Wide Integrated Water Monitoring - Defining and Implementing Sampling Objectives to Support Site Closure - 13060

    International Nuclear Information System (INIS)

    Wilborn, Bill; Knapp, Kathryn; Farnham, Irene; Marutzky, Sam

    2013-01-01

    The Underground Test Area (UGTA) activity is responsible for assessing and evaluating the effects of the underground nuclear weapons tests on groundwater at the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), and implementing a corrective action closure strategy. The UGTA strategy is based on a combination of characterization, modeling studies, monitoring, and institutional controls (i.e., monitored natural attenuation). The closure strategy verifies through appropriate monitoring activities that contaminants of concern do not exceed the SDWA at the regulatory boundary and that adequate institutional controls are established and administered to ensure protection of the public. Other programs conducted at the NNSS supporting the environmental mission include the Routine Radiological Environmental Monitoring Program (RREMP), Waste Management, and the Infrastructure Program. Given the current programmatic and operational demands for various water-monitoring activities at the same locations, and the ever-increasing resource challenges, cooperative and collaborative approaches to conducting the work are necessary. For this reason, an integrated sampling plan is being developed by the UGTA activity to define sampling and analysis objectives, reduce duplication, eliminate unnecessary activities, and minimize costs. The sampling plan will ensure the right data sets are developed to support closure and efficient transition to long-term monitoring. The plan will include an integrated reporting mechanism for communicating results and integrating process improvements within the UGTA activity as well as between other U.S. Department of Energy (DOE) Programs. (authors)

  14. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  15. Evaluation of a novel trocar-site closure and comparison with a standard Carter-Thomason closure device.

    Science.gov (United States)

    del Junco, Michael; Okhunov, Zhamshid; Juncal, Samuel; Yoon, Renai; Landman, Jaime

    2014-07-01

    The aim of this study was to evaluate and compare a novel trocars-site closure device, the WECK EFx™ Endo Fascial Closure System (EFx) with the Carter-Thomason CloseSure System® (CT) for the closure of laparoscopic trocar site defects created by a 12-mm dilating trocar. We created standardized laparoscopic trocars-site abdominal wall defects in cadaver models using a standard 12-mm laparoscopic dilating trocar. Trocar defects were closed in a randomized fashion using one of the two closure systems. We recorded time and number of attempts needed for complete defect closure. In addition, we recorded the ability to maintain pneumoperitoneum, endoscopic visualization, safety, security, and facility based on the surgeon's subjective evaluations. We compared outcomes for the EFx and CT closure systems. We created 72 standardized laparoscopic trocars-site abdominal wall defects. The mean time needed for complete defect closure was 98.53 seconds (±28.9) for the EFx compared with 133.61 seconds (±54.61) for the CT (Psafety were 2.92 for EFx vs 2.19 for CT (Pvs 1.83 for EFx and CT, respectively (Pvs 2.33 for CT (P=0.022). No significant difference was observed between the EFx and the CT systems for endoscopic visualization (2.28 vs 2.50, P=0.080). In this in vitro cadaver trial, the EFx was superior in terms of time needed to complete defect closure, safety, and facility. CT was superior in terms of maintenance of pneumoperitoneum. Both systems were equal in the number of attempts needed to complete the defect closure and endoscopic visualization.

  16. The equation of state of n-pentane in the atomistic model TraPPE-EH

    Science.gov (United States)

    Valeev, B. U.; Pisarev, V. V.

    2018-01-01

    In this work, we study the vapor-liquid equilibrium in n-pentane. We use the TraPPE-EH (transferable potentials for phase equilibria-explicit hydrogen) forcefield, where each hydrogen and carbon atom is considered as independent center of force. The fluid behavior was investigated with different values of density and temperature by molecular dynamics method. The n-pentane evaporation curve was calculated in the temperature range of 290 to 390 K. The densities of the coexisting phases are also calculated. The compression curve at 370 K was calculated and isothermal bulk modulus was found. The simulated properties of n-pentane are in good agreement with data from a database of the National Institute of Standards and Technology, so the TraPPE-EH model can be recommended for simulations of hydrocarbons.

  17. 105-DR Large Sodium Fire Facility decontamination, sampling, and analysis plan

    International Nuclear Information System (INIS)

    Knaus, Z.C.

    1995-01-01

    This is the decontamination, sampling, and analysis plan for the closure activities at the 105-DR Large Sodium Fire Facility at Hanford Reservation. This document supports the 105-DR Large Sodium Fire Facility Closure Plan, DOE-RL-90-25. The 105-DR LSFF, which operated from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility in the 100-D Area of the Hanford Site. The LSFF was established to investigate fire fighting and safety associated with alkali metal fires in the liquid metal fast breeder reactor facilities. The decontamination, sampling, and analysis plan identifies the decontamination procedures, sampling locations, any special handling requirements, quality control samples, required chemical analysis, and data validation needed to meet the requirements of the 105-DR Large Sodium Fire Facility Closure Plan in compliance with the Resource Conservation and Recovery Act

  18. Occupancy estimation and the closure assumption

    Science.gov (United States)

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing

  19. Eyelid closure at death

    Directory of Open Access Journals (Sweden)

    A D Macleod

    2009-01-01

    Full Text Available Aim: To observe the incidence of full or partial eyelid closure at death. Materials and Methods: The presence of ptosis was recorded in 100 consecutive hospice patient deaths. Results: Majority (63% of the patients died with their eyes fully closed, however, 37% had bilateral ptosis at death, with incomplete eye closure. In this study, central nervous system tumor involvement and/or acute hepatic encephalopathy appeared to be pre-mortem risk factors of bilateral ptosis at death. Conclusion: Organicity and not psychogenicity is, therefore, the likely etiology of failure of full eyelid closure at death.

  20. AX Tank farm closure settlement estimates and soil testing; TOPICAL

    International Nuclear Information System (INIS)

    BECKER, D.L.

    1999-01-01

    This study provides a conservative three-dimensional settlement study of the AX Tank Farm closure with fill materials and a surface barrier. The finite element settlement model constructed included the interaction of four tanks and the surface barrier with the site soil and bedrock. Also addressed are current soil testing techniques suitable for the site soil with recommendations applicable to the AX Tank Farm and the planned cone penetration testing

  1. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  2. Closure and Sealing Design Calculation

    International Nuclear Information System (INIS)

    T. Lahnalampi; J. Case

    2005-01-01

    The purpose of the ''Closure and Sealing Design Calculation'' is to illustrate closure and sealing methods for sealing shafts, ramps, and identify boreholes that require sealing in order to limit the potential of water infiltration. In addition, this calculation will provide a description of the magma that can reduce the consequences of an igneous event intersecting the repository. This calculation will also include a listing of the project requirements related to closure and sealing. The scope of this calculation is to: summarize applicable project requirements and codes relating to backfilling nonemplacement openings, removal of uncommitted materials from the subsurface, installation of drip shields, and erecting monuments; compile an inventory of boreholes that are found in the area of the subsurface repository; describe the magma bulkhead feature and location; and include figures for the proposed shaft and ramp seals. The objective of this calculation is to: categorize the boreholes for sealing by depth and proximity to the subsurface repository; develop drawing figures which show the location and geometry for the magma bulkhead; include the shaft seal figures and a proposed construction sequence; and include the ramp seal figure and a proposed construction sequence. The intent of this closure and sealing calculation is to support the License Application by providing a description of the closure and sealing methods for the Safety Analysis Report. The closure and sealing calculation will also provide input for Post Closure Activities by describing the location of the magma bulkhead. This calculation is limited to describing the final configuration of the sealing and backfill systems for the underground area. The methods and procedures used to place the backfill and remove uncommitted materials (such as concrete) from the repository and detailed design of the magma bulkhead will be the subject of separate analyses or calculations. Post-closure monitoring will not

  3. Scope and closures

    CERN Document Server

    Simpson, Kyle

    2014-01-01

    No matter how much experience you have with JavaScript, odds are you don’t fully understand the language. This concise yet in-depth guide takes you inside scope and closures, two core concepts you need to know to become a more efficient and effective JavaScript programmer. You’ll learn how and why they work, and how an understanding of closures can be a powerful part of your development skillset.

  4. 216-B-3 expansion ponds closure plan

    International Nuclear Information System (INIS)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA

  5. 216-B-3 expansion ponds closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  6. Progettazione e disciplina dell’esoscheletro : l'inestricabile co-evoluzione tra umani e robot

    NARCIS (Netherlands)

    Fosch Villaronga, Eduard; Özcan, Beste; Pirni, A.

    2017-01-01

    Quest’articolo descrive come sia stretto il legame tra esseri umani e l’evoluzione degli esoscheletri in termini di design, di regolamentazione e di necessità umane. Mentre gli attuali esoscheletri sono ingombranti e pesanti, i progressi nei materiali e nel design concettuale cambieranno

  7. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): (sm b ullet) CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

  8. La tradizione nella scienza il progresso scientifico come equilibrio dialettico tra idee innovatrici e tradizione in una raccolta di saggi inediti

    CERN Document Server

    Heisenberg, Werner

    1982-01-01

    In questa raccolta di saggi (inediti per l'Italia), da lui stesso selezionati poco prima della morte, Heisenberg analizza da varie angolazioni i rapporti tra progresso scientifico e tradizione : la storia della scienza è soprattutto una storia di idee, e da un giusto equilibrio dialettico tra i nuovi concetti e la tradizione, che costituisce la base ideale per discuterli, scaturisce il progress scientifico.

  9. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authority of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40

  10. Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-02-01

    The Bldg. 3001 Storage Canal at ORNL is leaking approximately 400 gal of water per day. This report presents the Bechtel National Inc. (BNI) Team's evaluation of plans and presents recommendations for interim closure alternatives to stop the release of radionuclides and potential release of heavy metals into the environment. This is a conceptual evaluation and does not include detailed engineering of physical mitigation methods. The alternatives address only interim closure measures and not final decommissioning of the canal

  11. CT based 3D printing is superior to transesophageal echocardiography for pre-procedure planning in left atrial appendage device closure.

    Science.gov (United States)

    Obasare, Edinrin; Mainigi, Sumeet K; Morris, D Lynn; Slipczuk, Leandro; Goykhman, Igor; Friend, Evan; Ziccardi, Mary Rodriguez; Pressman, Gregg S

    2018-05-01

    Accurate assessment of the left atrial appendage (LAA) is important for pre-procedure planning when utilizing device closure for stroke reduction. Sizing is traditionally done with transesophageal echocardiography (TEE) but this is not always precise. Three-dimensional (3D) printing of the LAA may be more accurate. 24 patients underwent Watchman device (WD) implantation (71 ± 11 years, 42% female). All had complete 2-dimensional TEE. Fourteen also had cardiac computed tomography (CCT) with 3D printing to produce a latex model of the LAA for pre-procedure planning. Device implantation was unsuccessful in 2 cases (one with and one without a 3D model). The model correlated perfectly with implanted device size (R 2  = 1; p < 0.001), while TEE-predicted size showed inferior correlation (R 2  = 0.34; 95% CI 0.23-0.98, p = 0.03). Fisher's exact test showed the model better predicted final WD size than TEE (100 vs. 60%, p = 0.02). Use of the model was associated with reduced procedure time (70 ± 20 vs. 107 ± 53 min, p = 0.03), anesthesia time (134 ± 31 vs. 182 ± 61 min, p = 0.03), and fluoroscopy time (11 ± 4 vs. 20 ± 13 min, p = 0.02). Absence of peri-device leak was also more likely when the model was used (92 vs. 56%, p = 0.04). There were trends towards reduced trans-septal puncture to catheter removal time (50 ± 20 vs. 73 ± 36 min, p = 0.07), number of device deployments (1.3 ± 0.5 vs. 2.0 ± 1.2, p = 0.08), and number of devices used (1.3 ± 0.5 vs. 1.9 ± 0.9, p = 0.07). Patient specific models of the LAA improve precision in closure device sizing. Use of the printed model allowed rapid and intuitive location of the best landing zone for the device.

  12. Program for closure of an inactive radioactive waste disposal site at the Savannah River Plant

    International Nuclear Information System (INIS)

    Cook, J.R.

    1987-01-01

    The 643-G Radioactive Waste Disposal Facility was operated at the Savannah River Plant from 1952 through 1974, and has been inactive since that time. The actions leading to closure of 643-G will involve a combination of activities consisting of limited waste removal, stabilization, capping, and monitoring. The overall effect of these closure actions will be to place the 643-G site in a physically and chemically stable state which will remain stable over a long period of time. During a one-hundred year institutional control period surveillance and monitoring of the site will be carried out to verify that the performance of the system is acceptable, and access of the general public to the site will be restricted. The program described in this paper is a recommendation; the actual closure plan will be negotiated with regulatory authorities. 2 figs., 1 tab

  13. Traços de resistência na obra de Augusto Roa Bastos

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Lopes Almeida

    2017-01-01

    Full Text Available Este estudo tem como proposta a análise de alguns traços de resistência presentes em algumas das produções literárias do autor paraguaio Augusto Roa Bastos. As obras escolhidas são Vigilia del Almirante (2008 e a trilogia Yo, el supremo (2003, El fiscal (2008 e El hijo del hombre (2003. O primeiro romance trata da volta ao período do descobrimento e desenvolve uma confrontação entre Colombo, os cronistas e o narrador. A trilogia se ocupa do cenários belicosos da história paraguaia e de alguns ditadores e suas relações com o poder. O tratamento dado a essa matéria histórica nas narrativas supracitadas pode ser entendida como traços de resistência, bem como alguns artifícios narrativos aplicados pelo autor. A análise será realizada a partir das discussões sobre Resistência e descobrimento propostos por Galeano (1989, Bitterli (2012 e Grützmacher (2009.

  14. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ''closure'' in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document

  15. Closure for spent-fuel transport and storage containers

    International Nuclear Information System (INIS)

    Ahner, S.; Knackstedt, H.G.; Srostlik, P.

    1980-01-01

    The container has a transport closure and a shielding closure. This shielding closure consists of two pieces (double closure system), which can be fartened to one another like a bayonet fixing. A central motion of rotation is enough to open the closure. It can be done remote-controlled as well as manually. (DG) [de

  16. Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-01-01

    This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 543, Liquid Disposal Units, according to the Federal Facility Agreement and Consent Order (FFACO, 1996) and the Corrective Action Plan (CAP) for CAU 543 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2007). CAU 543 is located at the Nevada Test Site (NTS), Nevada (Figure 1), and consists of the following seven Corrective Action Sites (CASs): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; CAS 15-23-03, Contaminated Sump, Piping; and CAS 06-07-01 is located at the Decontamination Facility in Area 6, adjacent to Yucca Lake. The remaining CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm in Area 15. The purpose of this CR is to provide a summary of the completed closure activities, to document waste disposal, and to present analytical data confirming that the remediation goals were met. The closure alternatives consisted of closure in place for two of the CASs, and no further action with implementation of best management practices (BMPs) for the remaining five CASs.

  17. Echocardiographic predictors of coil vs device closure in patients undergoing percutaneous patent ductus arteriosus closure.

    Science.gov (United States)

    Roushdy, Alaa; Abd El Razek, Yasmeen; Mamdouh Tawfik, Ahmed

    2018-01-01

    To determine anatomic and hemodynamic echocardiographic predictors for patent ductus arteriosus (PDA) device vs coil closure. Seventy-six patients who were referred for elective transcatheter PDA closure were enrolled in the study. All patients underwent full echocardiogram including measurement of the PDA pulmonary end diameter, color flow width and extent, peak and end-diastolic Doppler gradients across the duct, diastolic flow reversal, left atrial dimensions and volume, left ventricular sphericity index, and volumes. The study group was subdivided into 2 subgroups based on the mode of PDA closure whether by coil (n = 42) or device (n = 34). Using univariate analysis there was a highly significant difference between the 2 groups as regard the pulmonary end diameter measured in both the suprasternal and parasternal short-axis views as well as the color flow width and color flow extent (P closure group had statistically significant higher end-systolic and end-diastolic volumes indexed, left atrial volume, and diastolic flow reversal. Receiver operating characteristic curve analysis showed a pulmonary end diameter cutoff point from the suprasternal view > 2.5 mm and from parasternal short-axis view > 2.61 mm to have the highest balanced sensitivity and specificity to predict the likelihood for device closure (AUC 0.971 and 0.979 respectively). The pulmonary end diameter measured from the suprasternal view was the most independent predictor of device closure. The selection between PDA coil or device closure can be done on the basis of multiple anatomic and hemodynamic echocardiographic variables. © 2017 Wiley Periodicals, Inc.

  18. 2101-M pond closure plan. Volume 1, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Izatt, R. D.; Lerch, R. E.

    1993-06-01

    This document describes activities for the closure of a surface impoundment (2101-M Pond) at the Hanford Site. The 2101-H Pond was initially constructed in 1953 to serve as a drainage collection area for the 2101-H Building. (Until the Basalt Waste Isolation Project (BWIP) Laboratory was constructed in the 2101-M Building in 1979--1981, the only source contributing discharge to the pond was condensate water from the 2101-H Building heating, ventilation, and air conditioning (HVAC) system. The drains for the BWIP Laboratory rooms were plumbed into a 4-in., cast-iron, low-pressure drain pipe that carries waste water from the HVAC system to the pond. During the active life of the BWIP Laboratory, solutions of dissolved barium in groundwater samples were discharged to the 2101-M Pond via the laboratory drains. As a result of the discharges, a Part A permit application was initially submitted to the Washington State Department of Ecology (Ecology) in August 1986 which designates the 2101-M Pond as a surface impoundment.

  19. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Septic Systems' and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: (1) CAS 03-04-02, Area 3 Subdock Septic Tank; (2) CAS 03-59-05, Area 3 Subdock Cesspool; (3) CAS 12-59-01, Drilling/Welding Shop Septic Tanks; and (4) CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives included No Further Action and Clean Closure.

  20. The Mixed Waste Management Facility closure and expansion at the Savannah River Site

    International Nuclear Information System (INIS)

    Bittner, M.F.; Frye-O'Bryant, R.C.

    1992-01-01

    Process wastes containing radioactive and hazardous constituents have been generated throughout the operational history of the Savannah River Site. Solid wastes containing low level radionuclides were buried in Low Level Radioactive Disposal Facility (LLRWDF). Until 1986, waste containing lead and cadmium was disposed of in the Mixed Waste Management Facility (MWMF) portion of LLRWDF. Between 1986 and 1990, waste containing F-listed hazardous rags were buried. Current Resource Conservation and Recovery Act (RCRA) regulations prohibit the disposal of these hazardous wastes at nonpermitted facilities. This paper describes the closure activities for the MWMF, completed in 1990 and plans proposed for the expansion of this closure to include the LLRWDF suspect solvent rag trenches

  1. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives included No Further Action and Clean Closure.

  2. Orthodontic space closure versus implant placement in subjects with missing teeth.

    Science.gov (United States)

    Thilander, B

    2008-01-01

    The aim was to give a systematic review of alternative orthodontic space closure and implant placement in young adults with missing teeth. A literary search was made in the MEDLINE (Pub Med) database from 1990 to 2007. Totally 146 articles were found. Only studies in the English language or other languages with an English abstract were accepted, which reduced the number to 91 articles. Among them, only one prospective and three retrospective articles, two review papers and five case reports with discussion were found. The others presented one or two cases, or focused on treatment planning of missing teeth in general. Consequently, they were excluded. Moreover, a manual search of bibliographies in relevant journals gave no additional information. Thus, only 11 relevant articles were accepted. This systematic review clearly showed, that both alternatives (space closure or implant placement) present advantages as well as disadvantages. Knowledge about tissue reaction of orthodontic space closure and dento-facial development (including continuous changes of the dentition and its supporting tissues) are significant factors in the choice of treatment. Thus, we need more research on basic level and clinical follow-up studies of large samples.

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick; Petrello, Jaclyn

    2016-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States); Petrello, Jaclyn [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  5. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed

  6. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was

  7. Theory of reasoned action and theory of planned behavior-based dietary interventions in adolescents and young adults: a systematic review.

    Science.gov (United States)

    Hackman, Christine L; Knowlden, Adam P

    2014-01-01

    Childhood obesity has reached epidemic proportions in many nations around the world. The theory of planned behavior (TPB) and the theory of reasoned action (TRA) have been used to successfully plan and evaluate numerous interventions for many different behaviors. The aim of this study was to systematically review and synthesize TPB and TRA-based dietary behavior interventions targeting adolescents and young adults. THE FOLLOWING DATABASES WERE SYSTEMATICALLY SEARCHED TO FIND ARTICLES FOR THIS REVIEW: Academic Search Premier; Cumulative Index to Nursing and Allied Health (CINAHL); Education Resources Information Center (ERIC); Health Source: Nursing/Academic Edition; Cochrane Central Register of Controlled Trials (CENTRAL); and MEDLINE. Inclusion criteria for articles were: 1) primary or secondary interventions, 2) with any quantitative design, 3) published in the English language, 4) between January 2003 and March 2014, 5) that targeted adolescents or young adults, 6) which included dietary change behavior as the outcome, and 7) utilized TPB or TRA. Of the eleven intervention studies evaluated, nine resulted in dietary behavior change that was attributed to the treatment. Additionally, all but one study found there to be a change in at least one construct of TRA or TPB, while one study did not measure constructs. All of the studies utilized some type of quantitative design, with two employing quasi-experimental, and eight employing randomized control trial design. Among the studies, four utilized technology including emails, social media posts, information on school websites, web-based activities, audio messages in classrooms, interactive DVDs, and health-related websites. Two studies incorporated goal setting and four employed persuasive communication. Interventions directed toward changing dietary behaviors in adolescents should aim to incorporate multi-faceted, theory-based approaches. Future studies should consider utilizing randomized control trial design and

  8. Comparison of Outcomes between Early Fascial Closure and Delayed Abdominal Closure in Patients with Open Abdomen: A Systematic Review and Meta-Analysis

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2014-01-01

    Full Text Available Up to the present, the optimal time to close an open abdomen remains controversial. This study was designed to evaluate whether early fascial abdominal closure had advantages over delayed approach for open abdomen populations. Medline, Embase, and Cochrane Library were searched until April 2013. Search terms included “open abdomen,” “abdominal compartment syndrome,” “laparostomy,” “celiotomy,” “abdominal closure,” “primary,” “delayed,” “permanent,” “fascial closure,” and “definitive closure.” Open abdomen was defined as “fail to close abdominal fascia after a laparotomy.” Mortality, complications, and length of stay were compared between early and delayed fascial closure. In total, 3125 patients were included for final analysis, and 1942 (62% patients successfully achieved early fascial closure. Vacuum assisted fascial closure had no impact on pooled fascial closure rate. Compared with delayed abdominal closure, early fascial closure significantly reduced mortality (12.3% versus 24.8%, RR, 0.53, P<0.0001 and complication incidence (RR, 0.68, P<0.0001. The mean interval from open abdomen to definitive closure ranged from 2.2 to 14.6 days in early fascial closure groups, but from 32.5 to 300 days in delayed closure groups. This study confirmed clinical advantages of early fascial closure over delayed approach in treatment of patients with open abdomen.

  9. Incerta glòria di Joan Sales tra filologia, storia e traduzione

    Directory of Open Access Journals (Sweden)

    Patrizio Rigobon

    2015-12-01

    Full Text Available In questo saggio si fa una riflessione sull’opera di Joan Sales Incerta glòria e particolarmente si vede le conessione tra filologia, storia e traduzione. This article makes a reflection on the work of Joan Sales, Incerta glòria, and it particularly affects the connection between philology, history and translation.

  10. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  11. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

  12. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2012-01-01

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 (as amended March 2010)). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

  13. Environmental risk assessment as the basis for mine closure at Iscor Mining

    Energy Technology Data Exchange (ETDEWEB)

    Swart, S.J.; Pulles, W.; Boer, R.H.; Kirkaldy, J.; Pettit, C. [Iscor Mining, Pretoria (South Africa). Environmental Management Services

    1998-01-01

    This paper discusses the principles and application of risk assessment and management as the basis for environmental management within the mining industry. Unlike in other industries, mines are required to obtain closure certificates in terms of section 12 for the South African Minerals Act, which should ultimately release them from further environmental responsibilities. The focus shifts from conventional minimum legal compliance management to management of real environmental risks. The risk assessment approach has been applied to the planning of mine closure at Iscor`s Durban Navigation Collieries (Durnacol) in Kwa-Zulu Natal and certain key risk issues such as the long-term risk of water pollution from coal discard dumps have already progressed to fully quantitative risk assessment. This paper discussed the process which has been followed to date, with particular emphasis on the most recent phase, namely quantitative risk assessment and management of pollution from coal discard dumps. it is believed that the approach that is being pioneered at Durnacoal and which overcomes some of the more obvious deficineices of both the Environmental Risk Assessment Management (EMPR) and the traditional process will ultimately serve as the mode for all responsible mines in South Africa. It is also believed that this approach will enable the authorities to issue closure certificates with the confidence that there will be no unforeseen surprises in the years after closure. 9 figs., 1 tab.

  14. 50 CFR 648.161 - Closures.

    Science.gov (United States)

    2010-10-01

    ... Bluefish Fishery § 648.161 Closures. (a) EEZ closure. NMFS shall close the EEZ to fishing for bluefish by... dealer permit holders that no commercial quota is available for landing bluefish in that state. ...

  15. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2001-06-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit [CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV--187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

  16. Comparison of fasciotomy wound closures using traditional dressing changes and the vacuum-assisted closure device.

    Science.gov (United States)

    Zannis, John; Angobaldo, Jeff; Marks, Malcolm; DeFranzo, Anthony; David, Lisa; Molnar, Joseph; Argenta, Louis

    2009-04-01

    Fasciotomy wounds can be a major contributor to length of stay for patients as well as a difficult reconstructive challenge. Once the compartment pressure has been relieved and stabilized, the wound should be closed as quickly and early as possible to avoid later complications. Skin grafting can lead to morbidity and scarring at both the donor and fasciotomy site. Primary closure results in a more functional and esthetic outcome with less morbidity for the patient, but can often be difficult to achieve secondary to edema, skin retraction, and skin edge necrosis. Our objective was to examine fasciotomy wound outcomes, including time to definitive closure, comparing traditional wet-to-dry dressings, and the vacuum-assisted closure (VAC) device. This retrospective chart review included a consecutive series of patients over a 10-year period. This series included 458 patients who underwent 804 fasciotomies. Of these fasciotomy wounds, 438 received exclusively VAC. dressings, 270 received only normal saline wet-to-dry dressings, and 96 were treated with a combination of both. Of the sample, 408 patients were treated with exclusively VAC therapy or wet-to-dry dressings and 50 patients were treated with a combination of both. In comparing all wounds, there was a statistically significant higher rate of primary closure using the VAC versus traditional wet-to-dry dressings (P lower extremities and P extremities). The time to primary closure of wounds was shorter in the VAC. group in comparison with the non-VAC group. This study has shown that the use of the VAC for fasciotomy wound closure results in a higher rate of primary closure versus traditional wet-to-dry dressings. In addition, the time to primary closure of wounds or time to skin grafting is shorter when the VAC was employed. The VAC used in the described settings decreases hospitalization time, allows for earlier rehabilitation, and ultimately leads to increased patient satisfaction.

  17. A auto-percepção do envelhecimento e os traços de personalidade em idosos

    OpenAIRE

    Yassine, Ismael Macedo Correia

    2011-01-01

    Tese de mestrado, Psicologia (Secção de Psicologia Clínica e da Saúde - Núcleo de Psicologia Clínica Dinâmica), Universidade de Lisboa, Faculdade de Psicologia, 2011 O presente estudo foca a auto-percepção do envelhecimento e os traços de personalidade, assumindo como principais objectivos: (1) a exploração da relação entre auto-percepção do processo de envelhecimento por parte dos idosos (com mais de 60 anos de idade) e os traços de personalidade e, (2) a compreensão das dimensõe...

  18. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- and H-Areas at the Savannah River Site

    International Nuclear Information System (INIS)

    1996-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authority of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40

  19. An Examination of Factors Influencing Students Selection of Business Majors Using TRA Framework

    Science.gov (United States)

    Kumar, Anil; Kumar, Poonam

    2013-01-01

    Making decisions regarding the selection of a business major is both very important and challenging for students. An understanding of this decision-making process can be valuable for students, parents, and university programs. The current study applies the Theory of Reasoned Action (TRA) consumer decision-making model to examine factors that…

  20. First tier modeling of consumer dermal exposure to substances in consumer articles under REACH: a quantitative evaluation of the ECETOC TRA for consumers tool.

    Science.gov (United States)

    Delmaar, J E; Bokkers, B G H; ter Burg, W; van Engelen, J G M

    2013-02-01

    The demonstration of safe use of chemicals in consumer products, as required under REACH, is proposed to follow a tiered process. In the first tier, simple conservative methods and assumptions should be made to quickly verify whether risks for a particular use are expected. The ECETOC TRA Consumer Exposure Tool was developed to assist in first tier risk assessments for substances in consumer products. The ECETOC TRA is not a prioritization tool, but is meant as a first screening. Therefore, the exposure assessment needs to cover all products/articles in a specific category. For the assessment of the dermal exposure for substances in articles, ECETOC TRA uses the concept of a 'contact layer', a hypothetical layer that limits the exposure to a substance contained in the product. For each product/article category, ECETOC TRA proposes default values for the thickness of this contact layer. As relevant experimental exposure data is currently lacking, default values are based on expert judgment alone. In this paper it is verified whether this concept meets the requirement of being a conservative exposure evaluation method. This is done by confronting the ECETOC TRA expert judgment based predictions with a mechanistic emission model, based on the well established theory of diffusion of substances in materials. Diffusion models have been applied and tested in many applications of emission modeling. Experimentally determined input data for a number of material and substance combinations are available. The estimated emissions provide information on the range of emissions that could occur in reality. First tier tools such as ECETOC TRA tool are required to cover all products/articles in a category and to provide estimates that are at least as high as is expected on the basis of current scientific knowledge. Since this was not the case, it is concluded that the ECETOC TRA does not provide a proper conservative estimation method for the dermal exposure to articles. An

  1. ASD Closure in Structural Heart Disease.

    Science.gov (United States)

    Wiktor, Dominik M; Carroll, John D

    2018-04-17

    While the safety and efficacy of percutaneous ASD closure has been established, new data have recently emerged regarding the negative impact of residual iatrogenic ASD (iASD) following left heart structural interventions. Additionally, new devices with potential advantages have recently been studied. We will review here the potential indications for closure of iASD along with new generation closure devices and potential late complications requiring long-term follow-up. With the expansion of left-heart structural interventions and large-bore transseptal access, there has been growing experience gained with management of residual iASD. Some recently published reports have implicated residual iASD after these procedures as a potential source of diminished clinical outcomes and mortality. Additionally, recent trials investigating new generation closure devices as well as expanding knowledge regarding late complications of percutaneous ASD closure have been published. While percutaneous ASD closure is no longer a novel approach to managing septal defects, there are several contemporary issues related to residual iASD following large-bore transseptal access and new generation devices which serve as an impetus for this review. Ongoing attention to potential late complications and decreasing their incidence with ongoing study is clearly needed.

  2. 32 CFR 989.25 - Base closure and realignment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  3. The 324 building radiochemical engineering scales and high-level vault cells plan

    International Nuclear Information System (INIS)

    Prignano, A.L.

    1997-01-01

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building

  4. Patent ductus arteriosus closure using an Amplatzer™ ventricular septal defect closure device

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs. PMID:24294051

  5. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit[CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV-187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C

  6. Evaluation of the Momentum Closure Schemes in MPAS-Ocean

    Science.gov (United States)

    Zhao, Shimei; Liu, Yudi; Liu, Wei

    2018-04-01

    In order to compare and evaluate the performances of the Laplacian viscosity closure, the biharmonic viscosity closure, and the Leith closure momentum schemes in the MPAS-Ocean model, a variety of physical quantities, such as the relative reference potential energy (RPE) change, the RPE time change rate (RPETCR), the grid Reynolds number, the root mean square (RMS) of kinetic energy, and the spectra of kinetic energy and enstrophy, are calculated on the basis of results of a 3D baroclinic periodic channel. Results indicate that: 1) The RPETCR demonstrates a saturation phenomenon in baroclinic eddy tests. The critical grid Reynolds number corresponding to RPETCR saturation differs between the three closures: the largest value is in the biharmonic viscosity closure, followed by that in the Laplacian viscosity closure, and that in the Leith closure is the smallest. 2) All three closures can effectively suppress spurious dianeutral mixing by reducing the grid Reynolds number under sub-saturation conditions of the RPETCR, but they can also damage certain physical processes. Generally, the damage to the rotation process is greater than that to the advection process. 3) The dissipation in the biharmonic viscosity closure is strongly dependent on scales. Most dissipation concentrates on small scales, and the energy of small-scale eddies is often transferred to large-scale kinetic energy. The viscous dissipation in the Laplacian viscosity closure is the strongest on various scales, followed by that in the Leith closure. Note that part of the small-scale kinetic energy is also transferred to large-scale kinetic energy in the Leith closure. 4) The characteristic length scale L and the dimensionless parameter D in the Leith closure are inherently coupled. The RPETCR is inversely proportional to the product of D and L. When the product of D and L is constant, both the simulated RPETCR and the inhibition of spurious dianeutral mixing are the same in all tests using the Leith

  7. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  8. Closure Plan for Corrective Action Unit 110: Area 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Fitzmaurice, T. M.

    2000-01-01

    This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Unit 110 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). The U-3ax/bl is a historic disposal unit within the Area 3 Radioactive Waste Management Site located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit is scheduled for permanent closure under the Resource Conservation and Recovery Act as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10 5 cubic meters (8.12 x 10 6 cubic feet) of waste. NTS nuclear device testing generated approximately 95 percent of the total volume disposed of in U-3ax/bl, the majority of which came from the Waste Consolidation Project (80 percent of the total volume) (Elletson and Johnejack, 1995). Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is continuously in a state of moisture deficit. The U-3ax/bl Disposal Unit will be closed in place by installing a Resource Conservation and Recovery Act equivalent cover. Following cover construction a fence will be installed around the cover to prevent accidental damage to the cover. Post-closure monitoring will consist of site inspections to determine the condition of the engineered cover and cover performance monitoring using Time-Domain Reflectometry arrays to monitor moisture migration in the cover. Any identified maintenance and repair

  9. Closure Plan for Corrective Action Unit 110: Area 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Unit 110 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). The U-3ax/bl is a historic disposal unit within the Area 3 Radioactive Waste Management Site located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit is scheduled for permanent closure under the Resource Conservation and Recovery Act as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10{sup 5} cubic meters (8.12 x 10{sup 6} cubic feet) of waste. NTS nuclear device testing generated approximately 95 percent of the total volume disposed of in U-3ax/bl, the majority of which came from the Waste Consolidation Project (80 percent of the total volume) (Elletson and Johnejack, 1995). Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is continuously in a state of moisture deficit. The U-3ax/bl Disposal Unit will be closed in place by installing a Resource Conservation and Recovery Act equivalent cover. Following cover construction a fence will be installed around the cover to prevent accidental damage to the cover. Post-closure monitoring will consist of site inspections to determine the condition of the engineered cover and cover performance monitoring using Time-Domain Reflectometry arrays to monitor moisture migration in the cover. Any identified maintenance and

  10. Phacoemulsification with intraocular lens implantation in primary angle-closure suspect, primary angle-closure and primary angle-closure glaucoma with cataract

    Directory of Open Access Journals (Sweden)

    Kun Zeng

    2013-08-01

    Full Text Available AIM: To evaluate the features and clinical outcomes of cataract extraction by phacoemulsification with intraocular lens implantation in primary angle-closure suspect(PACS, primary angle-closure(PACand primary angle-closure glaucoma(PACGwith cataract.METHODS:Phacoemulsification with intraocular lens implantation was performed on 86 cases(86 eyesdiagnosed as PACS, PAC and PACG co-existing cataract from January to December 2012. All cases were followed up for 3 months to 1 year. Pre-operative and post-operative visual acuity, intraocular pressure(IOP, gonioscopy, ultrasound biomicroscopy(UBM, visual field and usage of anti-glaucomaous eye drops were recorded.RESULTS:Zonular dialysis existed in 19 eyes(22%. The post-operative visual acuity improved in 84 eyes(98%. The post-operative visual acuity was CONCLUSION: PACS, PAC and PACG co-existing zonular dialysis is common. Phacoemulsification with IOL implantation can reduce IOP, deepen anterior chamber and open angle.

  11. L’università italiana tra continuità e discontinuità. Intervista a Mauro Moretti

    Directory of Open Access Journals (Sweden)

    Alessandro Breccia

    2017-07-01

    Full Text Available L’intervista a Mauro Moretti inquadra il tema del dossier a partire dalle fonti per la storia delle università italiane nel secondo Novecento. Passa poi ad indicare alcuni tra i principali aspetti da indagare anche per definire al meglio una possibile cronologia

  12. Closure Report for Corrective Action Unit 537: Waste Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 537 is identified in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 as Waste Sites. CAU 537 is located in Areas 3 and 19 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada, and consists of the following two Corrective Action Sites (CASs): CAS 03-23-06, Bucket; Yellow Tagged Bags; and CAS 19-19-01, Trash Pit. CAU 537 closure activities were conducted in April 2007 according to the FFACO and Revision 3 of the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003). At CAS 03-23-06, closure activities included removal and disposal of a 15-foot (ft) by 15-ft by 8-ft tall wooden shed containing wood and metal debris and a 5-gallon plastic bucket containing deteriorated plastic bags with yellow radioactive contamination tape. The debris was transported to the Area 9 U10c Landfill for disposal after being screened for radiological contamination according to the ''NV/YMP Radiological Control Manual'' (NNSA/NSO, 2004). At CAS 19-19-01, closure activities included segregation, removal, and disposal of non-friable, non-regulated asbestos-containing material (ACM) and construction debris. The ACM was determined to be non-friable by waste characterization samples collected prior to closure activities. The ACM was removed and double-bagged by licensed, trained asbestos workers and transported to the Area 9 U10c Landfill for disposal. Construction debris was transported in end-dump trucks to the Area 9 U10c Landfill for disposal. Closure activities generated sanitary waste/construction debris and ACM. Waste generated during closure activities was appropriately managed and disposed. Waste characterization sample results are included as Appendix A of this report, and waste disposition documentation is included as Appendix B of this report. Copies of the Sectored Housekeeping Site Closure

  13. 40 CFR 264.178 - Closure.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Use and Management of Containers § 264.178 Closure. At closure, all hazardous waste and hazardous waste residues must be removed...

  14. Closure report for N Reactor

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule

  15. Closure report for N Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule.

  16. pTRA - A reporter system for monitoring the intracellular dynamics of gene expression.

    Science.gov (United States)

    Wagner, Sabine G; Ziegler, Martin; Löwe, Hannes; Kremling, Andreas; Pflüger-Grau, Katharina

    2018-01-01

    The presence of standardised tools and methods to measure and represent accurately biological parts and functions is a prerequisite for successful metabolic engineering and crucial to understand and predict the behaviour of synthetic genetic circuits. Many synthetic gene networks are based on transcriptional circuits, thus information on transcriptional and translational activity is important for understanding and fine-tuning the synthetic function. To this end, we have developed a toolkit to analyse systematically the transcriptional and translational activity of a specific synthetic part in vivo. It is based on the plasmid pTRA and allows the assignment of specific transcriptional and translational outputs to the gene(s) of interest (GOI) and to compare different genetic setups. By this, the optimal combination of transcriptional strength and translational activity can be identified. The design is tested in a case study using the gene encoding the fluorescent mCherry protein as GOI. We show the intracellular dynamics of mRNA and protein formation and discuss the potential and shortcomings of the pTRA plasmid.

  17. Lower first permanent molars: developing better predictors of spontaneous space closure.

    Science.gov (United States)

    Teo, Terry Kuo-Yih; Ashley, Paul Francis; Derrick, Donald

    2016-02-01

    First, first permanent molars (FPMs) of poor prognosis are often planned for extraction at an 'ideal time' so that second permanent molars (SPMs) erupt favourably to replace them. However for lower FPM extractions, timing is not an accurate predictor of success. The aim of this study was to identify additional radiographic factors that could better predict the degree of spontaneous space closure of the lower SPM following FPM extraction. Data from a previous study of 127 lower SPMs from 66 patients was re-analysed by incorporating additional radiographic factors. These included calcification stage of the bifurcation of the SPM, position of the second premolar, mesial angulation of SPM in relation to the FPM, and presence of the third permanent molar. Results were analysed using ordered logistic regression. Only 58 per cent of FPMs extracted at the 'ideal time' (SPM development at Demirjian stage E) had complete space closure. The best outcomes resulted from a combination of SPMs not at Demirjian development stage G, together with the presence of mesial angulation of the SPM and presence of the third permanent molar, where 85 per cent of those cases had complete space closure. Apart from extraction timing of the FPM, consideration must also be given to the presence of the third permanent molar and angulation of the SPM in order to ensure a reliable degree of spontaneous space closure of the lower SPM. © The Author 2015. Published by Oxford University Press on behalf of the European Orthodontic Society. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  18. Femoral Artery Stenosis Following Percutaneous Closure Using a Starclose Closure Device

    International Nuclear Information System (INIS)

    Bent, Clare Louise; Kyriakides, Constantinos; Matson, Matthew

    2008-01-01

    Starclose (Abbott Vascular Devices, Redwood City, CA) is a new arterial closure device that seals a femoral puncture site with an extravascular star-shaped nitinol clip. The clip projects small tines into the arterial wall which fold inward, causing the arterial wall to pucker, producing a purse-string-like seal closing the puncture site. The case history is that of a 76-year-old female patient who underwent day-case percutaneous diagnostic coronary angiography. A Starclose femoral artery closure device was used to achieve hemostasis with subsequent femoral artery stenosis.

  19. 9 CFR 318.301 - Containers and closures.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Containers and closures. 318.301... Canning and Canned Products § 318.301 Containers and closures. (a) Examination and cleaning of empty containers. (1) Empty containers, closures, and flexible pouch roll stock shall be evaluated by the...

  20. 75 FR 29322 - Base Closure and Realignment

    Science.gov (United States)

    2010-05-25

    ... DEPARTMENT OF DEFENSE Office of the Secretary Base Closure and Realignment AGENCY: Office of...)(ii) of the Defense Base Closure and Realignment Act of 1990. It provides a partial list of military installations closing or realigning pursuant to the 2005 Base Closure and Realignment (BRAC) Report. It also...

  1. The Environmental Agency's Assessment of the Post-Closure Safety Case for the BNFL DRIGG Low Level Radioactive Waste Disposal Facility

    International Nuclear Information System (INIS)

    Streatfield, I. J.; Duerden, S. L.; Yearsley, R. A.

    2002-01-01

    The Environment Agency is responsible, in England and Wales, for authorization of radioactive waste disposal under the Radioactive Substances Act 1993. British Nuclear Fuels plc (BNFL) is currently authorized by the Environment Agency to dispose of solid low level radioactive waste at its site at Drigg, near Sellafield, NW England. As part of a planned review of this authorization, the Environment Agency is currently undertaking an assessment of BNFL's Post-Closure Safety Case Development Programme for the Drigg disposal facility. This paper presents an outline of the review methodology developed and implemented by the Environment Agency specifically for the planned review of BNFL's Post-Closure Safety Case. The paper also provides an overview of the Environment Agency's progress in its on-going assessment programme

  2. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  3. Closure Welding of Plutonium Bearing Storage Containers

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2002-01-01

    A key element in the Department of Energy (DOE) strategy for the stabilization, packaging and storage of plutonium-bearing materials involves closure welding of DOE-STD-3013 Outer Containers (3013 container). The 3013 container provides the primary barrier and pressure boundary preventing release of plutonium-bearing materials to the environment. The final closure (closure weld) of the 3013 container must be leaktight, structurally sound and meet DOE STD 3013 specified criteria. This paper focuses on the development, qualification and demonstration of the welding process for the closure welding of Hanford PFP 3013 outer containers

  4. Fuel channel closure and adapter

    International Nuclear Information System (INIS)

    Cashen, W.S.

    1985-01-01

    This invention provides a mechanical closure/actuating ram combination particularly suited for use in sealing the ends of the pressure tubes when a CANDU-type reactor is refueled. It provides a cluster that may be inserted into a fuel channel end fitting to provide at least partial closing off of a pressure tube while permitting the disengagement of the fueling machine and its withdrawal from the closure for other purposes. The invention also provides a ram/closure combination wherein the application of loading force to a deformable sealing disk is regulated by a massive load bar component forming part of the fueling machine and being therefore accessible for maintenance or replacement

  5. Restaurant closures

    CERN Document Server

    Novae Restauration

    2012-01-01

    Christmas Restaurant closures Please note that the Restaurant 1 and Restaurant 3 will be closed from Friday, 21 December at 5 p.m. to Sunday, 6 January, inclusive. They will reopen on Monday, 7 January 2013.   Restaurant 2 closure for renovation To meet greater demand and to modernize its infrastructure, Restaurant 2 will be closed from Monday, 17 December. On Monday, 14 January 2013, Sophie Vuetaz’s team will welcome you to a renovated self-service area on the 1st floor. The selections on the ground floor will also be expanded to include pasta and pizza, as well as snacks to eat in or take away. To ensure a continuity of service, we suggest you take your break at Restaurant 1 or Restaurant 3 (Prévessin).

  6. Anterior Segment Imaging Predicts Incident Gonioscopic Angle Closure.

    Science.gov (United States)

    Baskaran, Mani; Iyer, Jayant V; Narayanaswamy, Arun K; He, Yingke; Sakata, Lisandro M; Wu, Renyi; Liu, Dianna; Nongpiur, Monisha E; Friedman, David S; Aung, Tin

    2015-12-01

    To investigate the incidence of gonioscopic angle closure after 4 years in subjects with gonioscopically open angles but varying degrees of angle closure detected on anterior segment optical coherence tomography (AS OCT; Visante; Carl Zeiss Meditec, Dublin, CA) at baseline. Prospective, observational study. Three hundred forty-two subjects, mostly Chinese, 50 years of age or older, were recruited, of whom 65 were controls with open angles on gonioscopy and AS OCT at baseline, and 277 were cases with baseline open angles on gonioscopy but closed angles (1-4 quadrants) on AS OCT scans. All subjects underwent gonioscopy and AS OCT at baseline (horizontal and vertical single scans) and after 4 years. The examiner performing gonioscopy was masked to the baseline and AS OCT data. Angle closure in a quadrant was defined as nonvisibility of the posterior trabecular meshwork by gonioscopy and visible iridotrabecular contact beyond the scleral spur in AS OCT scans. Gonioscopic angle closure in 2 or 3 quadrants after 4 years. There were no statistically significant differences in age, ethnicity, or gender between cases and controls. None of the control subjects demonstrated gonioscopic angle closure after 4 years. Forty-eight of the 277 subjects (17.3%; 95% confidence interval [CI], 12.8-23; P < 0.0001) with at least 1 quadrant of angle closure on AS OCT at baseline demonstrated gonioscopic angle closure in 2 or more quadrants, whereas 28 subjects (10.1%; 95% CI, 6.7-14.6; P < 0.004) demonstrated gonioscopic angle closure in 3 or more quadrants after 4 years. Individuals with more quadrants of angle closure on baseline AS OCT scans had a greater likelihood of gonioscopic angle closure developing after 4 years (P < 0.0001, chi-square test for trend for both definitions of angle closure). Anterior segment OCT imaging at baseline predicts incident gonioscopic angle closure after 4 years among subjects who have gonioscopically open angles and iridotrabecular contact on AS OCT at

  7. Randomized clinical trial of intestinal ostomy takedown comparing pursestring wound closure vs conventional closure to eliminate the risk of wound infection.

    Science.gov (United States)

    Camacho-Mauries, Daniel; Rodriguez-Díaz, José Luis; Salgado-Nesme, Noel; González, Quintín H; Vergara-Fernández, Omar

    2013-02-01

    The use of temporary stomas has been demonstrated to reduce septic complications, especially in high-risk anastomosis; therefore, it is necessary to reduce the number of complications secondary to ostomy takedowns, namely wound infection, anastomotic leaks, and intestinal obstruction. To compare the rates of superficial wound infection and patient satisfaction after pursestring closure of ostomy wound vs conventional linear closure. Patients undergoing colostomy or ileostomy closure between January 2010 and February 2011 were randomly assigned to linear closure (n = 30) or pursestring closure (n = 31) of their ostomy wound. Wound infection within 30 days of surgery was defined as the presence of purulent discharge, pain, erythema, warmth, or positive culture for bacteria. Patient satisfaction, healing time, difficulty managing the wound, and limitation of activities were analyzed with the Likert questionnaire. The infection rate for the control group was 36.6% (n = 11) vs 0% in the pursestring closure group (p ostomy wound closure (shorter healing time and improved patient satisfaction).

  8. Generalizzazione cartografica tra ricerca e applicazione La Cartografia Tecnica Regionale delle Marche

    Directory of Open Access Journals (Sweden)

    Stefano Bellesi

    2007-03-01

    Full Text Available Il problema della generalizzazione cartografica è uno dei temi principe nel dibattito cartografico tra gli addetti ai lavori. La cartografia multiscala rappresenta infatti una delle chimere dell’era digitale e, man mano che i DB cartografici si sono popolati di informazioni, ha dimostrato la sua realtà. L’orientamento è quello di automatizzare al massimo tutte le procedure prendendo in considerazione quelle che sono le esigenze della rappresentazione.

  9. Considerazioni sul problema dei rigassificatori tra aggregazione del consenso e conflitto ambientale

    OpenAIRE

    Lodoli, Flavio

    2011-01-01

    2009/2010 Considerazioni sul problema dei Rigassificatori tra Aggregazione del Consenso e Conflitto Ambientale 1. Il nostro Paese, per scelta politica e per una sostanziale limitata capacità di innovazione del mondo industriale, ha una quota attuale di produzione di energia da fonti rinnovabili poco significativa nonostante gli investimenti, i contributi e le agevolazioni fiscali che dovrebbero incentivare opportunamente ad esempio, l’utilizzo dell’energia solare che rappresenta una...

  10. Patent ductus arteriosus closure using an Amplatzer(™) ventricular septal defect closure device.

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs.

  11. Temporary Closure of the Open Abdomen: A Systematic Review on Delayed Primary Fascial Closure in Patients with an Open Abdomen

    NARCIS (Netherlands)

    Boele van Hensbroek, Pieter; Wind, Jan; Dijkgraaf, Marcel G. W.; Busch, Olivier R. C.; Goslings, J. Carel

    2009-01-01

    Background This study was designed to systematically review the literature to assess which temporary abdominal closure (TAC) technique is associated with the highest delayed primary fascial closure (FC) rate. In some cases of abdominal trauma or infection, edema or packing precludes fascial closure

  12. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevada National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

  13. Special closures for steel drum shipping containers

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Otts, J.V.

    1976-01-01

    The objective of this program was to develop special lid closures for typical, steel drum, radioactive material shipping containers. Previous experience and testing had shown that the existing container was adequate to withstand the required environmental tests for certification, but that the lid and closure were just marginally effective. Specifically, the lid closure failed to consistently maintain a tight seal between the container and the lid after drop tests, thus causing the package contents to be vulnerable in the subsequent fire test. Recognizing the deficiency, the United States Energy Research and Development Administration requested the development of new closure(s) which would: (1) be as strong and resistant to a drop as the bottom of the container; (2) have minimal economic impact on the overall container cost; (3) maximize the use of existing container designs; (4) consider crush loads; and (5) result in less dependence on personnel and loading procedures. Several techniques were evaluated and found to be more effective than the standard closure mechanism. Of these, three new closure techniques were designed, fabricated, and proven to be structurally adequate to provide containment when a 454-kg drum was drop tested from 9.14-m onto an unyielding surface. The three designs were: (1) a 152-mm long lid extension or skirt welded to the standard drum lid, (2) a separate inner lid, with 152-mm long skirt and (3) C-clamps used at the container-lid interface. Based upon structural integrity, economic impact, and minimal design change, the lid extension is the recommended special closure

  14. Some Recent Developments in Turbulence Closure Modeling

    Science.gov (United States)

    Durbin, Paul A.

    2018-01-01

    Turbulence closure models are central to a good deal of applied computational fluid dynamical analysis. Closure modeling endures as a productive area of research. This review covers recent developments in elliptic relaxation and elliptic blending models, unified rotation and curvature corrections, transition prediction, hybrid simulation, and data-driven methods. The focus is on closure models in which transport equations are solved for scalar variables, such as the turbulent kinetic energy, a timescale, or a measure of anisotropy. Algebraic constitutive representations are reviewed for their role in relating scalar closures to the Reynolds stress tensor. Seamless and nonzonal methods, which invoke a single closure model, are reviewed, especially detached eddy simulation (DES) and adaptive DES. Other topics surveyed include data-driven modeling and intermittency and laminar fluctuation models for transition prediction. The review concludes with an outlook.

  15. Analysis of Mining-induced Valley Closure Movements

    Science.gov (United States)

    Zhang, C.; Mitra, R.; Oh, J.; Hebblewhite, B.

    2016-05-01

    Valley closure movements have been observed for decades in Australia and overseas when underground mining occurred beneath or in close proximity to valleys and other forms of irregular topographies. Valley closure is defined as the inward movements of the valley sides towards the valley centreline. Due to the complexity of the local geology and the interplay between several geological, topographical and mining factors, the underlying mechanisms that actually cause this behaviour are not completely understood. A comprehensive programme of numerical modelling investigations has been carried out to further evaluate and quantify the influence of a number of these mining and geological factors and their inter-relationships. The factors investigated in this paper include longwall positional factors, horizontal stress, panel width, depth of cover and geological structures around the valley. It is found that mining in a series passing beneath the valley dramatically increases valley closure, and mining parallel to valley induces much more closure than other mining orientations. The redistribution of horizontal stress and influence of mining activity have also been recognised as important factors promoting valley closure, and the effect of geological structure around the valley is found to be relatively small. This paper provides further insight into both the valley closure mechanisms and how these mechanisms should be considered in valley closure prediction models.

  16. Magnetisable container closure and means for its removal

    International Nuclear Information System (INIS)

    Barrett, W.I.

    1984-01-01

    A container has a closed lower end and an open upper end, is made of a non-magnetic material such as aluminium, and has a peripheral groove spaced from the open end. A disc-like closure is of magnetic material such as ferritic steel, has a pair of spring jaws joined to the disc by a joining member such that when the disc of the closure is in position closing the open end of the container, the jaws engage in groove and hold the closure in position. To remove the closure, it is engaged by magnetic means mounted for example on a wall and having a step such that when the container is moved laterally away the closure is retained by the magnetic means aided by the step and thereby the closure becomes removed from the container. (author)

  17. Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, Michael Marquand [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Little, Bonnie Colleen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid waste was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.

  18. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage-transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  19. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-08-22

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  20. Urethrovaginal fistula closure.

    Science.gov (United States)

    Clifton, Marisa M; Goldman, Howard B

    2017-01-01

    In the developed world, urethrovaginal fistulas are most the likely the result of iatrogenic injury. These fistulas are quite rare. Proper surgical repair requires careful dissection and tension-free closure. The objective of this video is to demonstrate the identification and surgical correction of an urethrovaginal fistula. The case presented is of a 59-year-old woman with a history of pelvic organ prolapse and symptomatic stress urinary incontinence who underwent vaginal hysterectomy, anterior colporrhaphy, posterior colporrhaphy, and synthetic sling placement. Postoperatively, she developed a mesh extrusion and underwent sling excision. After removal of her synthetic sling, she began to experience continuous urinary incontinence. Physical examination and cystourethroscopy demonstrated an urethrovaginal fistula at the midurethra. Options were discussed and the patient wished to undergo transvaginal fistula repair. The urethrovaginal fistula was intubated with a Foley catheter. The fistula tract was isolated and removed. The urethra was then closed with multiple tension-free layers. This video demonstrates several techniques for identifying and subsequently repairing an urethrovaginal fistula. Additionally, it demonstrates the importance of tension-free closure. Urethrovaginal fistulas are rare. They should be repaired with careful dissection and tension-free closure.

  1. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): (sm b ullet) CAS 03-59-01, Bldg 3C-36 Septic System (sm b ullet) CAS 03-59-02, Bldg 3C-45 Septic System (sm b ullet) CAS 06-51-01, Sump and Piping (sm b ullet) CAS 06-51-02, Clay Pipe and Debris (sm b ullet) CAS 06-51-03, Clean Out Box and Piping (sm b ullet) CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work

  2. The Thrombin Receptor Antagonist for Clinical Event Reduction in Acute Coronary Syndrome (TRA*CER) trial: study design and rationale.

    Science.gov (United States)

    2009-09-01

    The protease-activated receptor 1 (PAR-1), the main platelet receptor for thrombin, represents a novel target for treatment of arterial thrombosis, and SCH 530348 is an orally active, selective, competitive PAR-1 antagonist. We designed TRA*CER to evaluate the efficacy and safety of SCH 530348 compared with placebo in addition to standard of care in patients with non-ST-segment elevation (NSTE) acute coronary syndromes (ACS) and high-risk features. TRA*CER is a prospective, randomized, double-blind, multicenter, phase III trial with an original estimated sample size of 10,000 subjects. Our primary objective is to demonstrate that SCH 530348 in addition to standard of care will reduce the incidence of the composite of cardiovascular death, myocardial infarction (MI), stroke, recurrent ischemia with rehospitalization, and urgent coronary revascularization compared with standard of care alone. Our key secondary objective is to determine whether SCH 530348 will reduce the composite of cardiovascular death, MI, or stroke compared with standard of care alone. Secondary objectives related to safety are the composite of moderate and severe GUSTO bleeding and clinically significant TIMI bleeding. The trial will continue until a predetermined minimum number of centrally adjudicated primary and key secondary end point events have occurred and all subjects have participated in the study for at least 1 year. The TRA*CER trial is part of the large phase III SCH 530348 development program that includes a concomitant evaluation in secondary prevention. TRA*CER will define efficacy and safety of the novel platelet PAR-1 inhibitor SCH 530348 in the treatment of high-risk patients with NSTE ACS in the setting of current treatment strategies.

  3. Closure Report for Corrective Action Unit 481: Area 12 T-Tunnel Conditional Release Storage Yard, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    Corrective Action Unit (CAU) 481 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Area 12 T-Tunnel Conditional Release Storage Yard. CAU 481 is located in Area 12 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. This CAU consists of one Corrective Action Site (CAS), CAS 12-42-05, Housekeeping Waste. CAU 481 closure activities were conducted by the Defense Threat Reduction Agency from August 2007 through July 2008 according to the FFACO and Revision 3 of the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites. Closure activities included removal and disposal of construction debris and low-level waste. Drained fluids, steel, and lead was recycled as appropriate. Waste generated during closure activities was appropriately managed and disposed.

  4. Rehabilitation of the Mary Kathleen uranium mine site after closure

    International Nuclear Information System (INIS)

    Ward, T.A.; Flannagan, J.C.; Hubery, R.W.

    1983-01-01

    The Mary Kathleen uranium mine and treatment plant ceased operation in late 1982 and a plan for the closure and rehabilitation of the area was developed. The object of the plan is to make all areas safe, remove all non-permanent structures and encourage natural revegetation. The plan has been accepted by the Queensland Mines Department. The mine pit will be left stable, inaccessible to vehicles, and containing about 50 metres of water. Mine waste and borrow areas will be contoured, ripped and seeded to encourage revegetation. The treatment plant area will be cleared of all equipment and light structures, decontaminated and revegetated. The evaporation ponds will be dried out, precipitate and contaminated soil will be removed to the tailings dam, and the area will be contoured and revegetated. The tailings will be covered with one metre of waste rock and boreholes will be used to recover groundwater containing salts for storage in the pit

  5. Reliability assessment of underground shaft closure

    International Nuclear Information System (INIS)

    Fossum, A.F.; Munson, D.E.

    1994-01-01

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties

  6. A photometric analysis of the neglected EW-type binary V336 TrA

    Science.gov (United States)

    Kriwattanawong, W.; Sarotsakulchai, T.; Maungkorn, S.; Reichart, D. E.; Haislip, J. B.; Kouprianov, V. V.; LaCluyze, A. P.; Moore, J. P.

    2018-05-01

    This study presents an analysis of photometric light curves and absolute parameters for the EW-type binary V336 TrA. VRI imaging observations were taken in 2013 by using the robotic telescopes PROMPT 4 and PROMPT 5 at Cerro Tololo Inter-American Observatory (CTIO), Chile. The observed light curves were fitted by using the Wilson-Devinney method. The results showed that V336 TrA is a W-type contact binary with a mass ratio of q = 1.396. The binary is a weak contact system with a fill-out factor of f = 15.69%. The system contains components with masses of 0.653 M⊙ and 0.912 M⊙ for the hotter and the cooler, respectively. The location of the secondary (less massive) component on the log M - log L diagram was found to be near the TAMS. The component has evolved to be oversize and overluminous. The orbital angular momentum of the binary was found to be log Jo = 51.61 cgs, less than all detached systems for same mass. The system has undergone angular momentum and/or mass loss, during the binary evolution from the detached to contact system.

  7. CDC 1604-A translator from the SLANG autocode for the TRA computer

    International Nuclear Information System (INIS)

    Belyaev, A.V.

    1976-01-01

    A SLANG - TRA translator has been devised for faster, easier programing. The program is realized on a SDS-1604A computer, input data are read from 80 column punch cards and translated into the standard Hollerith 026 code. Programs are processed in batches. A SDS-1604A teletype enables the operator to control the translation. The translator makes it possible to evaluate program processing time. The translator's high speed simplifies program editing and saves manpower

  8. Pawedness Trait Test (PaTRaT—A New Paradigm to Evaluate Paw Preference and Dexterity in Rats

    Directory of Open Access Journals (Sweden)

    Ana M. Cunha

    2017-10-01

    Full Text Available In rodents, dexterity is commonly analyzed in preference paradigms in which animals are given the chance to use either the left or the right front paws to manipulate food. However, paw preference and dexterity at population and individual levels are controversial as results are incongruent across paradigms. We have therefore developed a semi-quantitative method—the pawdeness trait test (PaTRaT—to evaluate paw preference degree in rats. The PaTRaT consists in a classification system, ranging from +4 to −4 where increasingly positive and negative values reflect the bias for left or right paw use, respectively. Sprague-Dawley male rats were confined into a metal rectangular mesh cylinder, from which they can see, smell and reach sugared rewards with their paws. Due to its size, the reward could only cross the mesh if aligned with its diagonal, imposing additional coordination. Animals were allowed to retrieve 10 rewards per session in a total of four sessions while their behavior was recorded. PaTRaT was repeated 4 and 8 weeks after the first evaluation. To exclude potential bias, rats were also tested for paw fine movement and general locomotion in other behavioral paradigms as well as impulsivity (variable delay-to-signal, VDS, memory and cognitive flexibility (water maze. At the population level 54% of the animals presented a rightward bias. Individually, all animals presented marked side-preferences, >2 and <−2 for left- and right-sided bias, respectively, and this preference was stable across the three evaluations. Inter-rater consistency was very high between two experienced raters and substantial when two additional inexperienced raters were included. Left- and right-biased animals presented no differences in the ability to perform fine movements with any of the forelimbs (staircase and general locomotor performance. Additionally, these groups performed similarly in executive function and memory tasks. In conclusion, PaTRaT is able

  9. Comparison of cost-effectiveness and postoperative outcome of device closure and open surgery closure techniques for treatment of patent ductus arteriosus

    Directory of Open Access Journals (Sweden)

    Alireza Ahmadi

    2014-01-01

    Full Text Available BACKGROUND: Various devices have been recently employed for percutaneous closure of the patent ductus arteriosus (PDA. Although the high effectiveness of device closure techniques has been clearly determined, a few studies have focused on the cost-effectiveness and also postoperative complications of these procedures in comparison with open surgery. The present study aimed to evaluate the clinical outcome and cost-effectiveness of PDA occlusion by Amplatzer and coil device in comparisong with open surgery. METHODS: In this cross-sectional study, a randomized sample of 201 patients aged 1 month to 16 years (105 patients with device closure and 96 patients with surgical closure was selected. The ratio of total pulmonary blood flow to total systemic blood flow, the Qp/Qs ratio, was measured using a pulmonary artery catheter. The cost analysis included direct medical care costs associated with device implantation and open surgery, as well as professional fees. All costs were calculated in Iranian Rials and then converted to US dollars. RESULTS: There was no statistical difference in mean Qp/Qs ratio before the procedure between the device closure group and the open surgery group (2.1 ± 0.7 versus 1.7 ± 0.6, P = 0.090. The mean measured costs were overall higher in the device closure group than in open closure group (948.87 ± 548.76 US$ versus 743.70 ± 696.91 US$, P < 0.001. This difference remained significant after adjustment for age and gender (Standardized Beta = 0.160, P = 0.031. PDA closure with the Amplatzer ductal occluder (1053.05 ± 525.73 US$ or with Nit-Occlud coils (PFM (912.73 ± 565.94 US$, P < 0.001 was more expensive than that via open surgery. However, the Cook detachable spring coils device closure (605.65 ± 194.62 US$, P = 0.650 had a non-significant cost difference with open surgery. No event was observed in the device closure group regarding in-hospital mortality or morbidity; however, in another group, 2 in-hospital deaths

  10. Closure Strategy for a Waste Disposal Facility with Multiple Waste Types and Regulatory Drivers at the Nevada Test Site - 8422

    International Nuclear Information System (INIS)

    D Wieland; V Yucel; L Desotell; G Shott; J Wrapp

    2008-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) plans to close the waste and classified material storage cells in the southeast quadrant of the Area 5 Radioactive Waste Management Site (RWMS), informally known as the '92-Acre Area', by 2011. The 25 shallow trenches and pits and the 13 Greater Confinement Disposal (GCD) borings contain various waste streams including low-level waste (LLW), low-level mixed waste (LLMW), transuranic (TRU), mixed transuranic (MTRU), and high specific activity LLW. The cells are managed under several regulatory and permit programs by the U.S. Department of Energy (DOE) and the Nevada Division of Environmental Protection (NDEP). Although the specific closure requirements for each cell vary, 37 closely spaced cells will be closed under a single integrated monolayer evapotranspirative (ET) final cover. One cell will be closed under a separate cover concurrently. The site setting and climate constrain transport pathways and are factors in the technical approach to closure and performance assessment. Successful implementation of the integrated closure plan requires excellent communication and coordination between NNSA/NSO and the regulators

  11. Numerical approximation of the Boltzmann equation : moment closure

    NARCIS (Netherlands)

    Abdel Malik, M.R.A.; Brummelen, van E.H.

    2012-01-01

    This work applies the moment method onto a generic form of kinetic equations to simplify kinetic models of particle systems. This leads to the moment closure problem which is addressed using entropy-based moment closure techniques utilizing entropy minimization. The resulting moment closure system

  12. WASTE PACKAGE OPERATIONS FY99 CLOSURE METHODS REPORT

    Energy Technology Data Exchange (ETDEWEB)

    M. C. Knapp

    1999-09-23

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing.

  13. WASTE PACKAGE OPERATIONS FY-99 CLOSURE METHODS REPORT

    International Nuclear Information System (INIS)

    M. C. Knapp

    1999-01-01

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing

  14. T-tube vs Primary Common Bile Duct Closure

    Directory of Open Access Journals (Sweden)

    M R Joshi

    2010-09-01

    Full Text Available INTRODUCTION: Closure of the common bile duct over T-tube after exploration is a widely practiced traditional method. However, its use may give rise to many complications. We do primary closure of common bile duct after exploration. Aim of the study is to see the efficacy and safety of the primary closure. METHODS: Study was carried out to compare the results of both the techniques from 2006 to 2009 in the cases proven to have common bile duct stone with or without the features of obstructive jaundice. Post operative hospital stay and morbidities related to both the groups were recorded and analyzed. RESULTS: There were total 71 cases included in the study. Thirty one in T-tube group and 40 in primary closure group. T-tube was removed in most of the cases after three weeks where as average time of drain removal in primary closure group is 5.79 +/-1.79 days. Incidence of retained stone was equal in each group. Major complication in T-tube group is biliary peritonitis in four patients at the time of T-tube removal whereas none of the patient from primary closure group suffered from such major complication. CONCLUSIONS: Primary closure after the common bile duct exploration is safe and it helps to avoid the morbidities related to T-tube. Keywords: Choledocholithiasis, Primary closure, retained stone, T-tube, Ureterorenoscope.

  15. SRS tank closure. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-08-01

    High-level waste (HLW) tank closure technology is designed to stabilize any remaining radionuclides and hazardous constituents left in a tank after bulk waste removal. Two Savannah River Site (SRS) HLW tanks were closed after cleansing and then filling each tank with three layers of grout. The first layer consists of a chemically reducing grout. The fill material has chemical properties that retard the movement of some radionuclides and chemical constituents. A layer of controlled low-strength material (CLSM), a self-leveling fill material, is placed on top of the reducing grout. CLSM provides sufficient strength to support the overbearing weight. The final layer is a free-flowing, strong grout similar to normal concrete. After the main tank cavity is filled, risers are filled with grout, and all waste transfer piping connected to the tank is isolated. The tank ventilation system is dismantled, and the remaining systems are isolated. Equipment that remains with the tank is filled with grout. The tank and ancillary systems are left in a state requiring only limited surveillance. Administrative procedures are in place to control land use and access. DOE eventually plans to remove all of its HLW storage tanks from service. These tanks are located at SRS, Hanford, and Idaho National Engineering and Environmental Laboratory. Low-activity waste storage tanks at Oak Ridge Reservation are also scheduled for closure

  16. Techniques for Abdominal Wall Closure after Damage Control Laparotomy: From Temporary Abdominal Closure to Early/Delayed Fascial Closure—A Review

    Directory of Open Access Journals (Sweden)

    Qian Huang

    2016-01-01

    Full Text Available Open abdomen (OA has been an effective treatment for abdominal catastrophes in traumatic and general surgery. However, management of patients with OA remains a formidable task for surgeons. The central goal of OA is closure of fascial defect as early as is clinically feasible without precipitating abdominal compartment syndrome. Historically, techniques such as packing, mesh, and vacuum-assisted closure have been developed to assist temporary abdominal closure, and techniques such as components separation, mesh-mediated traction, bridging fascial defect with permanent synthetic mesh, or biologic mesh have also been attempted to achieve early primary fascial closure, either alone or in combined use. The objective of this review is to present the challenges of these techniques for OA with a goal of early primary fascial closure, when the patient’s physiological condition allows.

  17. Uncertainty Quantification of Multi-Phase Closures

    Energy Technology Data Exchange (ETDEWEB)

    Nadiga, Balasubramanya T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-10-27

    In the ensemble-averaged dispersed phase formulation used for CFD of multiphase ows in nuclear reactor thermohydraulics, closures of interphase transfer of mass, momentum, and energy constitute, by far, the biggest source of error and uncertainty. Reliable estimators of this source of error and uncertainty are currently non-existent. Here, we report on how modern Validation and Uncertainty Quanti cation (VUQ) techniques can be leveraged to not only quantify such errors and uncertainties, but also to uncover (unintended) interactions between closures of di erent phenomena. As such this approach serves as a valuable aide in the research and development of multiphase closures. The joint modeling of lift, drag, wall lubrication, and turbulent dispersion|forces that lead to tranfer of momentum between the liquid and gas phases|is examined in the frame- work of validation of the adiabatic but turbulent experiments of Liu and Banko , 1993. An extensive calibration study is undertaken with a popular combination of closure relations and the popular k-ϵ turbulence model in a Bayesian framework. When a wide range of super cial liquid and gas velocities and void fractions is considered, it is found that this set of closures can be validated against the experimental data only by allowing large variations in the coe cients associated with the closures. We argue that such an extent of variation is a measure of uncertainty induced by the chosen set of closures. We also nd that while mean uid velocity and void fraction pro les are properly t, uctuating uid velocity may or may not be properly t. This aspect needs to be investigated further. The popular set of closures considered contains ad-hoc components and are undesirable from a predictive modeling point of view. Consequently, we next consider improvements that are being developed by the MIT group under CASL and which remove the ad-hoc elements. We use non-intrusive methodologies for sensitivity analysis and calibration (using

  18. Una community emergente tra progettazione territorio e infrastrutture La prima conferenza Autodesk degli utenti italiani

    Directory of Open Access Journals (Sweden)

    Redazione Redazione

    2005-10-01

    Full Text Available La prima edizione dell’Autodesk User Conference dedicata aiSistemi Informativi Territoriali ed alla progettazione delle infrastrutture, tenutasi a Roma il 29 settembre 2005, diventerà l’appuntamento fisso sulla convergenza tra tecnologie CAD e GISche molti reclamavano da tempo.

  19. La narrazione orale tra bambini ed adulti: da flusso continuo a vena carsica?

    Directory of Open Access Journals (Sweden)

    Milena Bernardi

    2010-02-01

    Full Text Available Con il segmento di ricerca che viene presentato nella sua prima fase si prende in esame l’ipotesi di un processo, in atto da tempo, di trasformazione e/o di declino della narrazione orale nel rapporto quotidiano tra adulti e bambini, inteso, in questo specifico contesto, come “spia” dei mutamenti degli stili educativi e degli interscambi tra famiglie ed operatori dei servizi in relazione all’alleanza educativa. La complessità dei filoni di studio che rimandano alla voce “narrazione” negli ambiti delle scienze umane esige la precisazione della curvatura “narrativa” scelta per la ricerca in corso: curvatura che appartiene all’epistemologia della letteratura per l’infanzia e della pedagogia della narrazione in quanto permette di imboccare la strada della ricerca pedagogica rivolta innanzi tutto ai significati che il narrare assume nella relazione educativa e poi ai modi ed alle forme della narrazione che coinvolgono l’infanzia. In un’epoca di grande vitalità e visibilità delle narrazioni, tra cui abbondano le produzioni scritte, illustrate, filmate per l’infanzia, sembra esserci una zona marginale e quasi sommersa della comunicazione narrante che rischia di sfumare in una sorta di oblio. E’ la zona della narrazione orale esperita in praesentia da bambini ed adulti insieme, tessuta con fili di parole che restituiscono senso all’intero arco delle esperienze, tentando di riordinare il disordine che spesso connota la realtà, interpretando, stabilendo connessioni, impregnando di quel senso i vissuti, i fatti, le relazioni, le cose e le parole stesse, ancora, nelle voci. Del rischio e delle conseguenze che possono derivare dalla sua mancanza si occupa questo contributo di ricerca che, dal punto di vista metodologico, si è avvalso e si avvale sia di analisi condotte sul corpus dei testi sia della raccolta di dati e informazioni tramite incontri condotti con la modalità del focus group, con educatrici e genitori.

  20. Factors affecting closure of a temporary stoma.

    Science.gov (United States)

    Taylor, Claire; Varma, Sarah

    2012-01-01

    The purpose of the study was to examine time to reversal of a temporary ostomy, reasons for delayed closure, and patient satisfaction with the scheduling of their closure and related hospital care. Cross-sectional, descriptive study. The target population comprised patients who underwent creation of a temporary ostomy and reversal surgery within one National Health System Hospital Trust in the United Kingdom. The population served by this Trust are ethnically and socioeconomically diverse, predominantly living in urban areas around Greater London. Sixty-one persons who met inclusion criteria were identified. A two-step analytical process was undertaken. First, a literature review examining incidence and causes of delayed stoma closure was undertaken. Second, a postal survey of all patients who had had their stoma closed in 2009 was conducted. Respondents were allowed 2 weeks to complete and return the questionnaire. The survey instrument was developed locally and subjected to content validation using ostomy patients, surgical and nursing colleagues. It consisted of 9 questions querying time from original surgery to closure, reasons for delaying closure surgery beyond 12 weeks, and satisfaction with care. Twenty-seven patients returned their questionnaires, indicating they consented to participate; a response rate of 44%. Half of the respondents (n = 14 [52%]) underwent closure surgery within 6 months of stoma formation; the remaining 48% waited more than 6 months (median: 6.5 months, range: 1.5-26 months). Thirteen patients (48%) reported a delay in receiving their stoma closure; the main reason cited was the need for a course of adjuvant postoperative chemotherapy. Three quarters of respondents (22 [74%]) were satisfied with the overall care they received. Findings from this study suggest that stoma closure may be associated with fewest complications if performed before 12 weeks.

  1. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline

  2. CIRSE Vascular Closure Device Registry

    International Nuclear Information System (INIS)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Purpose: Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods: The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results: Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion: The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters.

  3. Metronomic chemotherapy in the neoadjuvant setting: results of two parallel feasibility trials (TraQme and TAME) in patients with HER2+ and HER2− locally advanced breast cancer

    International Nuclear Information System (INIS)

    Petry, V.; Gagliato, D.M.; Leal, A.I.C.; Arai, R.J.; Longo, E.; Andrade, F.; Ricci, M.D.; Piato, J.R.; Barroso-Sousa, R.; Hoff, P.M.; Mano, M.S.

    2015-01-01

    Neoadjuvant chemotherapy has practical and theoretical advantages over adjuvant chemotherapy strategy in breast cancer (BC) management. Moreover, metronomic delivery has a more favorable toxicity profile. The present study examined the feasibility of neoadjuvant metronomic chemotherapy in two cohorts [HER2+ (TraQme) and HER2− (TAME)] of locally advanced BC. Twenty patients were prospectively enrolled (TraQme, n=9; TAME, n=11). Both cohorts received weekly paclitaxel at 100 mg/m 2 during 8 weeks followed by weekly doxorubicin at 24 mg/m 2 for 9 weeks in combination with oral cyclophosphamide at 100 mg/day (fixed dose). The HER2+ cohort received weekly trastuzumab. The study was interrupted because of safety issues. Thirty-six percent of patients in the TAME cohort and all patients from the TraQme cohort had stage III BC. Of note, 33% from the TraQme cohort and 66% from the TAME cohort displayed hormone receptor positivity in tumor tissue. The pathological complete response rates were 55% and 18% among patients enrolled in the TraQme and TAME cohorts, respectively. Patients in the TraQme cohort had more advanced BC stages at diagnosis, higher-grade pathological classification, and more tumors lacking hormone receptor expression, compared to the TAME cohort. The toxicity profile was also different. Two patients in the TraQme cohort developed pneumonitis, and in the TAME cohort we observed more hematological toxicity and hand-foot syndrome. The neoadjuvant metronomic chemotherapy regimen evaluated in this trial was highly effective in achieving a tumor response, especially in the HER2+ cohort. Pneumonitis was a serious, unexpected adverse event observed in this group. Further larger and randomized trials are warranted to evaluate the association between metronomic chemotherapy and trastuzumab treatment

  4. Metronomic chemotherapy in the neoadjuvant setting: results of two parallel feasibility trials (TraQme and TAME) in patients with HER2+ and HER2− locally advanced breast cancer

    Energy Technology Data Exchange (ETDEWEB)

    Petry, V.; Gagliato, D.M.; Leal, A.I.C.; Arai, R.J.; Longo, E. [Divisão de Oncologia Médica, Instituto do Câncer do Estado de São Paulo, Faculdade de Medicina, Universidade de São Paulo, São Paulo, SP (Brazil); Andrade, F. [Núcleo de Mastologia, Hospital Sírio Libanês, São Paulo, SP (Brazil); Ricci, M.D.; Piato, J.R.; Barroso-Sousa, R.; Hoff, P.M.; Mano, M.S. [Divisão de Oncologia Médica, Instituto do Câncer do Estado de São Paulo, Faculdade de Medicina, Universidade de São Paulo, São Paulo, SP (Brazil)

    2015-03-06

    Neoadjuvant chemotherapy has practical and theoretical advantages over adjuvant chemotherapy strategy in breast cancer (BC) management. Moreover, metronomic delivery has a more favorable toxicity profile. The present study examined the feasibility of neoadjuvant metronomic chemotherapy in two cohorts [HER2+ (TraQme) and HER2− (TAME)] of locally advanced BC. Twenty patients were prospectively enrolled (TraQme, n=9; TAME, n=11). Both cohorts received weekly paclitaxel at 100 mg/m{sup 2} during 8 weeks followed by weekly doxorubicin at 24 mg/m{sup 2} for 9 weeks in combination with oral cyclophosphamide at 100 mg/day (fixed dose). The HER2+ cohort received weekly trastuzumab. The study was interrupted because of safety issues. Thirty-six percent of patients in the TAME cohort and all patients from the TraQme cohort had stage III BC. Of note, 33% from the TraQme cohort and 66% from the TAME cohort displayed hormone receptor positivity in tumor tissue. The pathological complete response rates were 55% and 18% among patients enrolled in the TraQme and TAME cohorts, respectively. Patients in the TraQme cohort had more advanced BC stages at diagnosis, higher-grade pathological classification, and more tumors lacking hormone receptor expression, compared to the TAME cohort. The toxicity profile was also different. Two patients in the TraQme cohort developed pneumonitis, and in the TAME cohort we observed more hematological toxicity and hand-foot syndrome. The neoadjuvant metronomic chemotherapy regimen evaluated in this trial was highly effective in achieving a tumor response, especially in the HER2+ cohort. Pneumonitis was a serious, unexpected adverse event observed in this group. Further larger and randomized trials are warranted to evaluate the association between metronomic chemotherapy and trastuzumab treatment.

  5. 40 CFR 267.143 - Financial assurance for closure.

    Science.gov (United States)

    2010-07-01

    ...), utilizing the certificate of insurance for closure specified at 40 CFR 264.151(e). (f) Corporate financial... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must...

  6. Tubular closure mechanism

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1982-01-01

    This invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holder used in nuclear reactors. The closure mechanism is composed of a latching member which includes a generally circular chamber with a plurality of elongated latches depending therefrom. The latching member circumscribes part of an actuator member which is disposed within the latching member so as to be axially movable. The axial movement of the actuator actuates positioning of the latches between positions in which the latches are locked and secured within the actuator member. Means, capable of being remotely manipulated, are provided to move the actuator in order to position the latches and load the articles within the tube

  7. Design and analysis of PCRV core cavity closure

    International Nuclear Information System (INIS)

    Lee, T.T.; Schwartz, A.A.; Koopman, D.C.A.

    1980-05-01

    Design requirements and considerations for a core cavity closure which led to the choice of a concrete closure with a toggle hold-down as the design for the Gas-Cooled Fast Breeder Reactor (GCFR) plant are discussed. A procedure for preliminary stress analysis of the closure by means of a three-dimensional finite element method is described. A limited parametric study using this procedure indicates the adequacy of the present closure design and the significance of radial compression developed as a result of inclined support reaction

  8. Planning document for the Advanced Landfill Cover Demonstration

    International Nuclear Information System (INIS)

    Hakonson, T.E.; Bostick, K.V.

    1994-01-01

    The Department of Energy and Department of Defense are faced with the closure of thousands of decommissioned radioactive, hazardous, and mixed waste landfills as a part of ongoing Environmental Restoration activities. Regulations on the closure of hazardous and radioactive waste landfills require the construction of a ''low-permeability'' cover over the unit to limit the migration of liquids into the underlying waste. These landfills must be maintained and monitored for 30 years to ensure that hazardous materials are not migrating from the landfill. This test plan is intended as an initial road map for planning, designing, constructing, evaluating, and documenting the Advanced Landfill Cover Demonstration (ALCD). It describes the goals/ objectives, scope, tasks, responsibilities, technical approach, and deliverables for the demonstration

  9. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    BECHTEL NEVADA

    2005-01-01

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CAS 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls

  10. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2005-12-01

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CAS 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.

  11. 40 CFR 265.280 - Closure and post-closure.

    Science.gov (United States)

    2010-07-01

    ... contaminants caused by wind erosion; and (4) Compliance with § 265.276 concerning the growth of food-chain... and post-closure care objectives of paragraph (a) of this section: (1) Type and amount of hazardous..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and...

  12. Airport Movement Area Closure Planner, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR research develops an automation tool improving temporary and permanent runway closure management. The Movement Area Closure Planner (MACP) provides airport...

  13. The Application of the Theory of Reasoned Action and Planned Behavior to Prevention Science in Counseling Psychology

    Science.gov (United States)

    Romano, John L.; Netland, Jason D.

    2008-01-01

    The theory of reasoned action and planned behavior (TRA/PB) is a model of behavior change that has been extensively studied in the health sciences but has had limited exposure in the counseling psychology literature. The model offers counseling psychologists a framework to conceptualize prevention research and practice. The model is important to…

  14. Left ventricular remodeling and change of systolic function after closure of patent ductus arteriosus in adults: device and surgical closure.

    Science.gov (United States)

    Jeong, Young-Hoon; Yun, Tae-Jin; Song, Jong-Min; Park, Jung-Jun; Seo, Dong-Man; Koh, Jae-Kon; Lee, Se-Whan; Kim, Mi-Jeong; Kang, Duk-Hyun; Song, Jae-Kwan

    2007-09-01

    Left ventricular (LV) remodeling and predictors of LV systolic function late after closure of patent ductus arteriosus (PDA) in adults remain to be clearly demonstrated. In 45 patients with PDA, including 28 patients who received successful occlusion using the Amplatzer device (AD group) (AGA, Golden Valley, MN) and 17 patients who received surgical closure (OP group), echocardiography studies were performed before closure and 1 day (AD group) or within 7 days (OP group) after closure, and then were repeated at > or = 6 months (17 +/- 13 months). In both groups, LV ejection fraction (EF) and end-diastolic volume index were significantly decreased immediately after closure, whereas end-systolic volume index did not change. During the long-term follow-up period, end-systolic as well as end-diastolic volume indices decreased significantly in both groups and LV EF recovered compared to the immediate postclosure state. However, LV EF remained low compared to the preclosure state. Five patients (11.1%) including 3 patients in the AD group and 2 patients in the OP group showed persistent late LV systolic dysfunction (EF or = 62% had a sensitivity of 72% and a specificity of 83% for predicting late normal LV EF after closure. Left ventricular EF remains low late after PDA closure compared with preclosure state in adults. Preclosure LV EF is the best index to predict late postclosure LV EF.

  15. Single-site neural tube closure in human embryos revisited.

    Science.gov (United States)

    de Bakker, Bernadette S; Driessen, Stan; Boukens, Bastiaan J D; van den Hoff, Maurice J B; Oostra, Roelof-Jan

    2017-10-01

    Since the multi-site closure theory was first proposed in 1991 as explanation for the preferential localizations of neural tube defects, the closure of the neural tube has been debated. Although the multi-site closure theory is much cited in clinical literature, single-site closure is most apparent in literature concerning embryology. Inspired by Victor Hamburgers (1900-2001) statement that "our real teacher has been and still is the embryo, who is, incidentally, the only teacher who is always right", we decided to critically review both theories of neural tube closure. To verify the theories of closure, we studied serial histological sections of 10 mouse embryos between 8.5 and 9.5 days of gestation and 18 human embryos of the Carnegie collection between Carnegie stage 9 (19-21 days) and 13 (28-32 days). Neural tube closure was histologically defined by the neuroepithelial remodeling of the two adjoining neural fold tips in the midline. We did not observe multiple fusion sites in neither mouse nor human embryos. A meta-analysis of case reports on neural tube defects showed that defects can occur at any level of the neural axis. Our data indicate that the human neural tube fuses at a single site and, therefore, we propose to reinstate the single-site closure theory for neural tube closure. We showed that neural tube defects are not restricted to a specific location, thereby refuting the reasoning underlying the multi-site closure theory. Clin. Anat. 30:988-999, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  16. Moment Closure for the Stochastic Logistic Model

    National Research Council Canada - National Science Library

    Singh, Abhyudai; Hespanha, Joao P

    2006-01-01

    ..., which we refer to as the moment closure function. In this paper, a systematic procedure for constructing moment closure functions of arbitrary order is presented for the stochastic logistic model...

  17. Comparison of cost-effectiveness and postoperative outcome of device closure and open surgery closure techniques for treatment of patent ductus arteriosus.

    Science.gov (United States)

    Ahmadi, Alireza; Sabri, Mohammadreza; Bigdelian, Hamid; Dehghan, Bahar; Gharipour, Mojgan

    2014-01-01

    Various devices have been recently employed for percutaneous closure of the patent ductus arteriosus (PDA). Although the high effectiveness of device closure techniques has been clearly determined, a few studies have focused on the cost-effectiveness and also postoperative complications of these procedures in comparison with open surgery. The present study aimed to evaluate the clinical outcome and cost-effectiveness of PDA occlusion by Amplatzer and coil device in comparisong with open surgery. In this cross-sectional study, a randomized sample of 201 patients aged 1 month to 16 years (105 patients with device closure and 96 patients with surgical closure) was selected. The ratio of total pulmonary blood flow to total systemic blood flow, the Qp/Qs ratio, was measured using a pulmonary artery catheter. The cost analysis included direct medical care costs associated with device implantation and open surgery, as well as professional fees. All costs were calculated in Iranian Rials and then converted to US dollars. There was no statistical difference in mean Qp/Qs ratio before the procedure between the device closure group and the open surgery group (2.1 ± 0.7 versus 1.7 ± 0.6, P = 0.090). The mean measured costs were overall higher in the device closure group than in open closure group (948.87 ± 548.76 US$ versus 743.70 ± 696.91 US$, P gender (Standardized Beta = 0.160, P = 0.031). PDA closure with the Amplatzer ductal occluder (1053.05 ± 525.73 US$) or with Nit-Occlud coils (PFM) (912.73 ± 565.94 US$, P < 0.001) was more expensive than that via open surgery. However, the Cook detachable spring coils device closure (605.65 ± 194.62 US$, P = 0.650) had a non-significant cost difference with open surgery. No event was observed in the device closure group regarding in-hospital mortality or morbidity; however, in another group, 2 in-hospital deaths occurred, two patients experienced pneumonia and seizure, and one suffered electrolyte abnormalities including

  18. Mass extraction container closure integrity physical testing method development for parenteral container closure systems.

    Science.gov (United States)

    Yoon, Seung-Yil; Sagi, Hemi; Goldhammer, Craig; Li, Lei

    2012-01-01

    Container closure integrity (CCI) is a critical factor to ensure that product sterility is maintained over its entire shelf life. Assuring the CCI during container closure (C/C) system qualification, routine manufacturing and stability is important. FDA guidance also encourages industry to develop a CCI physical testing method in lieu of sterility testing in a stability program. A mass extraction system has been developed to check CCI for a variety of container closure systems such as vials, syringes, and cartridges. Various types of defects (e.g., glass micropipette, laser drill, wire) were created and used to demonstrate a detection limit. Leakage, detected as mass flow in this study, changes as a function of defect length and diameter. Therefore, the morphology of defects has been examined in detail with fluid theories. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water, placebo, or drug product (3 mg/mL concentration) solution. Also, it has been verified that the method was robust, and capable of determining the acceptance limit using 3σ for syringes and 6σ for vials. Sterile products must maintain their sterility over their entire shelf life. Container closure systems such as those found in syringes and vials provide a seal between rubber and glass containers. This seal must be ensured to maintain product sterility. A mass extraction system has been developed to check container closure integrity for a variety of container closure systems such as vials, syringes, and cartridges. In order to demonstrate the method's capability, various types of defects (e.g., glass micropipette, laser drill, wire) were created in syringes and vials and were tested. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water

  19. Military Base Realignments and Closures: DOD Has Improved Environmental Cleanup Reporting but Should Obtain and Share More Information

    Science.gov (United States)

    2017-01-01

    million), and BRAC planning and compliance funding ($19.2 million) in fiscal year 2015 for cleanup at BRAC installations. 20DOD’s financial statement...Closures: Impact of Terminating, Relocating, or Outsourcing the Services of the Armed Forces Institute of Pathology. GAO-08-20. Washington, D.C

  20. Storage shaft definitive closure plug and method

    International Nuclear Information System (INIS)

    Dardaine, M.

    1992-01-01

    A definitive closure plug system for radioactive waste storage at any deepness, is presented. The inherent weight of the closure materials is used to set in the plug: these materials display an inclined sliding surface in such a way that when the closure material rests on a stable surface of the shaft storage materials, the relative sliding of the different materials tends to spread them towards the shaft internal wall so as to completely occlude the shaft

  1. Protecting an island nation from extreme pandemic threats: Proof-of-concept around border closure as an intervention.

    Directory of Open Access Journals (Sweden)

    Matt Boyd

    Full Text Available Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons. These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations.To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country.An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses.For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, "Scenario A", it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion. Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of "Scenario A", or 2.75% of the country's population dying giving a net benefit of NZ$54 billion (USD$36 billion. But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for "Scenario A" times three for 26 weeks of border closure-but not for only 12 weeks of closure when it would still be beneficial.This "proof-of-concept" work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective.

  2. Estudo da aderência de arames da armadura de tração em conectores de dutos flexíveis

    OpenAIRE

    Marcelo Badini Daflon

    2010-01-01

    Este projeto tem o objetivo de apresentar o estudo dos arames da armadura de tração que são empregados no transporte de óleo, gás e umbilicais hidráulicos na indústria petrolífera. Este estudo foi desenvolvido sob a necessidade de melhor ancoragem dos arames da armadura de tração de modo a garantir que, mesmo após a ruptura do arame dentro do conector não haverá o escorregamento do mesmo provocando a queda do duto flexível. Assim sendo, foi estabelecido o estudo de aderência da interface dos ...

  3. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    Energy Technology Data Exchange (ETDEWEB)

    Ziock, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Little, Bonnie Colleen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.

  4. Laser peripheral iridoplasty for angle-closure.

    Science.gov (United States)

    Ng, Wai Siene; Ang, Ghee Soon; Azuara-Blanco, Augusto

    2012-02-15

    Angle-closure glaucoma is a leading cause of irreversible blindness in the world. Treatment is aimed at opening the anterior chamber angle and lowering the IOP with medical and/or surgical treatment (e.g. trabeculectomy, lens extraction). Laser iridotomy works by eliminating pupillary block and widens the anterior chamber angle in the majority of patients. When laser iridotomy fails to open the anterior chamber angle, laser iridoplasty may be recommended as one of the options in current standard treatment for angle-closure. Laser peripheral iridoplasty works by shrinking and pulling the peripheral iris tissue away from the trabecular meshwork. Laser peripheral iridoplasty can be used for crisis of acute angle-closure and also in non-acute situations.   To assess the effectiveness of laser peripheral iridoplasty in the treatment of narrow angles (i.e. primary angle-closure suspect), primary angle-closure (PAC) or primary angle-closure glaucoma (PACG) in non-acute situations when compared with any other intervention. In this review, angle-closure will refer to patients with narrow angles (PACs), PAC and PACG. We searched CENTRAL (which contains the Cochrane Eyes and Vision Group Trials Register) (The Cochrane Library 2011, Issue 12), MEDLINE (January 1950 to January 2012), EMBASE (January 1980 to January 2012), Latin American and Caribbean Literature on Health Sciences (LILACS) (January 1982 to January 2012), the metaRegister of Controlled Trials (mRCT) (www.controlled-trials.com), ClinicalTrials.gov (www.clinicaltrials.gov) and the WHO International Clinical Trials Registry Platform (ICTRP) (www.who.int/ictrp/search/en). There were no date or language restrictions in the electronic searches for trials. The electronic databases were last searched on 5 January 2012. We included only randomised controlled trials (RCTs) in this review. Patients with narrow angles, PAC or PACG were eligible. We excluded studies that included only patients with acute presentations

  5. Device closure of secundum atrial septal defect's and the risk of cardiac erosion.

    Science.gov (United States)

    Thomson, J D R; Qureshi, S A

    2015-12-01

    Cardiac erosion related to transcatheter atrial septal defect closure devices is of increasing concern. Erosion is reported to have occurred with most of currently available occluder devices. Perhaps due to the very large number of implants worldwide, the Amplatzer (St Jude) occluder is associated with the majority of cardiac erosion events reported in the literature. Best current estimates of the incidence of erosion with the St Jude device are between one and three cases per 1000 implants. Most events occur early after implantation and it is rare, although not unheard of, for events to occur after a year following device insertion. It is important that those involved with closure programmes are vigilant for the problem, because device-related erosion is associated with a significant mortality risk. Despite considerable debate, the risk factors (either patient or device) for erosion remain unclear and require further investigation. Currently available data sets have focussed largely on erosion cohorts and are unable to place these cases in appropriate context with non-erosion closure cases. What is certain is that programmes implanting these devices must take care to implant appropriately sized devices and have in place plans to ensure that patients are both well informed and can access help and advice in the event of developing symptoms.

  6. The potential migration effect of rural hospital closures

    DEFF Research Database (Denmark)

    Sørensen, Jens Fyhn Lykke

    2008-01-01

    to out-migration, although the hypothetical way of questioning leaves uncertainty about the actual scale of out-migration. Child families appear to be the most likely out-migrants. Elderly people may be hardest hit by a hospital closure, being most reliant on health care and least inclined to move away.......Rural hospital closures are high on the current health care agenda in Denmark. One raised concern is that rural hospital closures may further decrease population numbers in rural areas, as closures may induce some residents to move away from affected areas, i.e. closer to health care services...

  7. CIRSE Vascular Closure Device Registry

    Science.gov (United States)

    Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2010-01-01

    Purpose Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters. PMID:20981425

  8. Predicting substance-abuse treatment providers' communication with clients about medication assisted treatment: a test of the theories of reasoned action and planned behavior.

    Science.gov (United States)

    Roberto, Anthony J; Shafer, Michael S; Marmo, Jennifer

    2014-01-01

    The purpose of this investigation is to determine if the theory of reasoned action (TRA) and theory of planned behavior (TPB) can retrospectively predict whether substance-abuse treatment providers encourage their clients to use medicated-assisted treatment (MAT) as part of their treatment plan. Two-hundred and ten substance-abuse treatment providers completed a survey measuring attitudes, subjective norms, perceived behavioral control, intentions, and behavior. Results indicate that substance-abuse treatment providers have very positive attitudes, neutral subjective norms, somewhat positive perceived behavioral control, somewhat positive intentions toward recommending MAT as part of their clients' treatment plan, and were somewhat likely to engage in the actual behavior. Further, the data fit both the TRA and TPB, but with the TPB model having better fit and predictive power for this target audience and behavior. The theoretical and practical implications for the developing messages for substance-abuse treatment providers and other health-care professionals who provide treatment to patients with substance use disorders are discussed. Copyright © 2014 Elsevier Inc. All rights reserved.

  9. Assessment of consistent two-equation closure for forest flows

    DEFF Research Database (Denmark)

    Sogachev, Andrey; Cavar, Dalibor; Bechmann, Andreas

    of grid turbulence and wall-bounded flow, the closure suggested is also valid for homogeneous shear flows commonly observed inside tall vegetative canopies. The present work assess the plant drag closure by comparing results of two different CFD models against observations derived over the forested area...... and can be applied for any twoequation closure. Results derived by different CFD models with k-epsilon and k-omega closure are similar and in good comparison with observations. Overall, numerical results show that the closure performs well, opening new possibilities for application to tasks related...... to the atmospheric boundary layer—where it is important to adequately account for the influences of vegetation....

  10. A successful environmental remediation program closure and post-closure activities (CAPCA) Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Bowers, M.H.

    1991-01-01

    The Resource Conservation and Recovery Act (RCRA) closure of eleven waste management units at the Department of Energy's (DOE's) Oak Ridge Y-12 Plant is nearing completion. The Oak Ridge Y-12 Plant is managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy under Contract DE-AC05-84OR21400. The Closure and Post Closure Program (CAPCA) has been accomplished on an accelerated schedule through the efforts of a dedicated team from several organizations. This paper relates experience gained from the program that can be of benefit on other DOE environmental remediation projects. Technical design and construction aspects, as well as project management considerations, are discussed

  11. Evaluation of Container Closure System Integrity for Frozen Storage Drug Products.

    Science.gov (United States)

    Nieto, Alejandra; Roehl, Holger; Brown, Helen; Nikoloff, Jonas; Adler, Michael; Mahler, Hanns-Christian

    2016-01-01

    Sometimes, drug product for parenteral administration is stored in a frozen state (e.g., -20 °C or -80 °C), particularly during early stages of development of some biotech molecules in order to provide sufficient stability. Shipment of frozen product could potentially be performed in the frozen state, yet possibly at different temperatures, for example, using dry ice (-80 °C). Container closure systems of drug products usually consist of a glass vial, rubber stopper, and an aluminum crimped cap. In the frozen state, the glass transition temperature (Tg) of commonly used rubber stoppers is between -55 and -65 °C. Below their Tg, rubber stoppers are known to lose their elastic properties and become brittle, and thus potentially fail to maintain container closure integrity in the frozen state. Leaks during frozen temperature storage and transportation are likely to be transient, yet, can possibly risk container closure integrity and lead to microbial contamination. After thawing, the rubber stopper is supposed to re-seal the container closure system. Given the transient nature of the possible impact on container closure integrity in the frozen state, typical container closure integrity testing methods (used at room temperature conditions) are unable to evaluate and thus confirm container closure integrity in the frozen state. Here we present the development of a novel method (thermal physical container closure integrity) for direct assessment of container closure integrity by a physical method (physical container closure integrity) at frozen conditions, using a modified He leakage test. In this study, different container closure systems were evaluated with regard to physical container closure integrity in the frozen state to assess the suitability of vial/stopper combinations and were compared to a gas headspace method. In summary, the thermal physical container closure integrity He leakage method was more sensitive in detecting physical container closure

  12. Tank closure reducing grout

    International Nuclear Information System (INIS)

    Caldwell, T.B.

    1997-01-01

    A reducing grout has been developed for closing high level waste tanks at the Savannah River Site in Aiken, South Carolina. The grout has a low redox potential, which minimizes the mobility of Sr 90 , the radionuclide with the highest dose potential after closure. The grout also has a high pH which reduces the solubility of the plutonium isotopes. The grout has a high compressive strength and low permeability, which enhances its ability to limit the migration of contaminants after closure. The grout was designed and tested by Construction Technology Laboratories, Inc. Placement methods were developed by the Savannah River Site personnel

  13. Breastfeeding Duration and the Theory of Planned Behavior and Breastfeeding Self-Efficacy Framework: A Systematic Review of Observational Studies.

    Science.gov (United States)

    Lau, Christine Y K; Lok, Kris Y W; Tarrant, Marie

    2018-03-01

    Introduction Numerous studies have shown that the constructs of the Theory of Reasoned Action (TRA), Theory of Planned Behavior (TPB) and Breastfeeding Self-Efficacy (BSE) Framework can effectively identify relationships between maternal psychosocial factors and breastfeeding initiation. However, the ability of these theories to predict breastfeeding duration has not been adequately analyzed. The aim of the review was to examine the utility of the constructs of TRA/TPB and BSE to predict breastfeeding duration. Methods We conducted a literature search using Pubmed (1980-May 2015), Medline (1966-May 2015), CINAHL (1980-May 2015), EMBASE (1980-May 2015) and PsycINFO (1980-May 2015). We selected studies that were observational studies without randomization or blinding, using TRA, TPB or BSE as the framework for analysis. Only studies reporting on breastfeeding duration were included. Results Thirty studies were selected, which include four using TRA, 10 using TPB, 15 using BSE and one using a combination of TPB and BSE. Maternal intention and breastfeeding self-efficacy were found to be important predictors of breastfeeding duration. Inconsistent findings were found in assessing the relationship between maternal attitudes, subjective norms, perceived behavior control and breastfeeding duration. Discussion The inadequacy of these constructs in explaining breastfeeding duration indicates a need to further explore the role of maternal self-determination in breastfeeding behavior.

  14. Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation

    International Nuclear Information System (INIS)

    Mackey, H.

    1998-07-01

    Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner

  15. A kinematic view of loop closure.

    Science.gov (United States)

    Coutsias, Evangelos A; Seok, Chaok; Jacobson, Matthew P; Dill, Ken A

    2004-03-01

    We consider the problem of loop closure, i.e., of finding the ensemble of possible backbone structures of a chain segment of a protein molecule that is geometrically consistent with preceding and following parts of the chain whose structures are given. We reduce this problem of determining the loop conformations of six torsions to finding the real roots of a 16th degree polynomial in one variable, based on the robotics literature on the kinematics of the equivalent rotator linkage in the most general case of oblique rotators. We provide a simple intuitive view and derivation of the polynomial for the case in which each of the three pair of torsional axes has a common point. Our method generalizes previous work on analytical loop closure in that the torsion angles need not be consecutive, and any rigid intervening segments are allowed between the free torsions. Our approach also allows for a small degree of flexibility in the bond angles and the peptide torsion angles; this substantially enlarges the space of solvable configurations as is demonstrated by an application of the method to the modeling of cyclic pentapeptides. We give further applications to two important problems. First, we show that this analytical loop closure algorithm can be efficiently combined with an existing loop-construction algorithm to sample loops longer than three residues. Second, we show that Monte Carlo minimization is made severalfold more efficient by employing the local moves generated by the loop closure algorithm, when applied to the global minimization of an eight-residue loop. Our loop closure algorithm is freely available at http://dillgroup. ucsf.edu/loop_closure/. Copyright 2004 Wiley Periodicals, Inc. J Comput Chem 25: 510-528, 2004

  16. Socket sclerosis--an obstacle for orthodontic space closure?

    Science.gov (United States)

    Baumgaertel, Sebastian

    2009-07-01

    Socket sclerosis is a rare reaction to tooth extraction resulting in high-density bone in the center of the alveolar process, where, under normal circumstances, cancellous bone is to be expected. In an adult orthodontic patient, routine extractions of the mandibular first permanent bicuspids were performed, resulting in socket sclerosis and unsuccessful orthodontic space closure. Orthodontic mini-implants were inserted to augment anchorage and aid in space closure. In the presence of socket sclerosis, conventional orthodontic mechanics failed to close the extraction spaces. However, with absolute anchorage in place, space closure occurred at a nearly normal rate. After treatment, no signs of socket sclerosis were discernible on the periapical radiographs. Socket sclerosis can be an obstacle for orthodontic space closure if traditional mechanics are employed. However, mini-implant-reinforced anchorage can lead to successful space closure, resulting in complete resolution of the sclerotic sites.

  17. Pathways of topological rank analysis (PoTRA): a novel method to detect pathways involved in hepatocellular carcinoma.

    Science.gov (United States)

    Li, Chaoxing; Liu, Li; Dinu, Valentin

    2018-01-01

    Complex diseases such as cancer are usually the result of a combination of environmental factors and one or several biological pathways consisting of sets of genes. Each biological pathway exerts its function by delivering signaling through the gene network. Theoretically, a pathway is supposed to have a robust topological structure under normal physiological conditions. However, the pathway's topological structure could be altered under some pathological condition. It is well known that a normal biological network includes a small number of well-connected hub nodes and a large number of nodes that are non-hubs. In addition, it is reported that the loss of connectivity is a common topological trait of cancer networks, which is an assumption of our method. Hence, from normal to cancer, the process of the network losing connectivity might be the process of disrupting the structure of the network, namely, the number of hub genes might be altered in cancer compared to that in normal or the distribution of topological ranks of genes might be altered. Based on this, we propose a new PageRank-based method called Pathways of Topological Rank Analysis (PoTRA) to detect pathways involved in cancer. We use PageRank to measure the relative topological ranks of genes in each biological pathway, then select hub genes for each pathway, and use Fisher's exact test to test if the number of hub genes in each pathway is altered from normal to cancer. Alternatively, if the distribution of topological ranks of gene in a pathway is altered between normal and cancer, this pathway might also be involved in cancer. Hence, we use the Kolmogorov-Smirnov test to detect pathways that have an altered distribution of topological ranks of genes between two phenotypes. We apply PoTRA to study hepatocellular carcinoma (HCC) and several subtypes of HCC. Very interestingly, we discover that all significant pathways in HCC are cancer-associated generally, while several significant pathways in subtypes

  18. Primary closure of equine laryngotomy incisions

    DEFF Research Database (Denmark)

    Lindegaard, C.; Karlsson, L.; Ekstrøm, Claus Thorn

    2016-01-01

    incision between January 1995 and June 2012 were reviewed. Horses with a laryngotomy incision closed in three layers for primary healing were included. Descriptive data on healing characteristics and complications of laryngotomy wounds were collected from the medical records and via follow......The objective was to report healing characteristics and complications after primary closure of equine laryngotomies and analyse factors potentially associated with complications. This retrospective case series of the medical records of horses (n = 180) undergoing laryngoplasty and laryngotomy...... after primary closure of equine laryngotomy incisions are infrequent and considered of minimal severity and can be performed safely when paying careful attention to the closure of the cricothyroid membrane....

  19. Detailed design report for an operational phase panel-closure system

    International Nuclear Information System (INIS)

    1996-01-01

    Under contract to Westinghouse Electric Corporation (Westinghouse), Waste Isolation Division (WID), IT Corporation has prepared a detailed design of a panel-closure system for the Waste Isolation Pilot Plant (WIPP). Preparation of this detailed design of an operational-phase closure system is required to support a Resource Conservation and Recovery Act (RCRA) Part B permit application and a non-migration variance petition. This report describes the detailed design for a panel-closure system specific to the WIPP site. The recommended panel-closure system will adequately isolate the waste-emplacement panels for at least 35 years. This report provides detailed design and material engineering specifications for the construction, emplacement, and interface-grouting associated with a panel-closure system at the WIPP repository, which would ensure that an effective panel-closure system is in place for at least 35 years. The panel-closure system provides assurance that the limit for the migration of volatile organic compounds (VOC) will be met at the point of compliance, the WIPP site boundary. This assurance is obtained through the inherent flexibility of the panel-closure system

  20. Percutaneous Transcatheter PDA Device Closure in Infancy

    International Nuclear Information System (INIS)

    Ullah, M.; Sultan, M.; Akhtar, K.; Sadiq, N.; Akbar, H.

    2014-01-01

    Objective: To evaluate the results and complications associated with transcatheter closure of patent ductus arteriosus (PDA) in infants. Study Design: Quasi-experimental study. Place and Duration of Study: Paediatric Cardiology Department of Armed Forces Institute of Cardiology / National Institute of Heart Diseases (AFIC/NIHD), Rawalpindi, from December 2010 to June 2012. Methodology: Infants undergoing transcatheter device closure of PDA were included. All patients were evaluated by experienced Paediatric Cardiologists with 2-D echocardiography and Doppler before the procedure. Success of closure and complications were recorded. Results: The age of patients varied from 05 - 12 months and 31 (56.4%) were females. Out of the 55 infants, 3 (5.4%) were not offered device closure after aortogram (two large tubular type ducts and one tiny duct, considered unsuitable for device closure); while in 50 (96.1%) patients out of remaining 52, the duct was successfully closed with transcatheter PDA device or coil. In one infant, device deployment resulted in acquired coarctation, necessitating device retrieval by Snare followed by surgical duct interruption and another patient had non-fatal cardiac arrest during device deployment leading to abandonment of procedure and subsequent successful surgical interruption. Local vascular complications occurred in 12 (21.8%) of cases and all were satisfactorily treated. Conclusion: Transcatheter device closure of PDA in infants was an effective procedure in the majority of cases; however, here were considerable number of local access site vascular complications. (author)

  1. Transcatheter closure of patent ductus arteriosus: past, present and future.

    Science.gov (United States)

    Baruteau, Alban-Elouen; Hascoët, Sébastien; Baruteau, Julien; Boudjemline, Younes; Lambert, Virginie; Angel, Claude-Yves; Belli, Emre; Petit, Jérôme; Pass, Robert

    2014-02-01

    This review aims to describe the past history, present techniques and future directions in transcatheter treatment of patent ductus arteriosus (PDA). Transcatheter PDA closure is the standard of care in most cases and PDA closure is indicated in any patient with signs of left ventricular volume overload due to a ductus. In cases of left-to-right PDA with severe pulmonary arterial hypertension, closure may be performed under specific conditions. The management of clinically silent or very tiny PDAs remains highly controversial. Techniques have evolved and the transcatheter approach to PDA closure is now feasible and safe with current devices. Coils and the Amplatzer Duct Occluder are used most frequently for PDA closure worldwide, with a high occlusion rate and few complications. Transcatheter PDA closure in preterm or low-bodyweight infants remains a highly challenging procedure and further device and catheter design development is indicated before transcatheter closure is the treatment of choice in this delicate patient population. The evolution of transcatheter PDA closure from just 40 years ago with 18F sheaths to device delivery via a 3F sheath is remarkable and it is anticipated that further improvements will result in better safety and efficacy of transcatheter PDA closure techniques. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  2. Patent foramen ovale closure using a bioabsorbable closure device: safety and efficacy at 6-month follow-up.

    Science.gov (United States)

    Van den Branden, Ben J; Post, Martijn C; Plokker, Herbert W; ten Berg, Jurriën M; Suttorp, Maarten J

    2010-09-01

    The aim of this study was to assess the mid-term safety and efficacy of percutaneous patent foramen ovale (PFO) closure using a bioabsorbable device (BioSTAR, NMT Medical, Boston, Massachusetts). Closure of PFO in patients with cryptogenic stroke has proven to be safe and effective using different types of permanent devices. All consecutive patients who underwent percutaneous PFO closure with the bioabsorbable closure device between November 2007 and January 2009 were included. Residual shunt was assessed using contrast transthoracic echocardiography. Sixty-two patients (55% women, mean age 47.7 ± 11.8 years) underwent PFO closure. The in-hospital complications were a surgical device retrieval in 2 patients (3.2%), device reposition in 1 (1.6%), and a minimal groin hematoma in 6 patients (9.7%). The short-term complications at 1-month follow-up (n = 60) were a transient ischemic attack in the presence of a residual shunt in 1 patient and new supraventricular tachycardia in 7 patients (11.3%). At 6-month follow-up (n = 60), 1 patient without residual shunt developed a transient ischemic attack and 1 developed atrial fibrillation. A mild or moderate residual shunt was noted in 51.7%, 33.9%, and 23.7% after 1-day, 1-month, and 6-month follow-up, respectively. A large shunt was present in 8.3%, 3.4%, and 0% after 1-day, 1-month, and 6-month follow-up. Closure of PFO using the bioabsorbable device is associated with a low complication rate and a low recurrence rate of embolic events. However, a relatively high percentage of mild or moderate residual shunting is still present at 6-month follow-up. Copyright © 2010 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  3. Emanuele KANCEFF, "L’immagine della Sicilia nei resoconti di viaggio del Settecento. Tra classicità ed emozione romantica", 2015

    Directory of Open Access Journals (Sweden)

    Pino Menzio

    2015-06-01

    Full Text Available Emanuele KANCEFF, "L’immagine della Sicilia nei resoconti di viaggio del Settecento. Tra classicità ed emozione romantica", Scicli, Edizioni di storia e studi sociali, 2015 [Book Review

  4. Emergent properties during dorsal closure in Drosophila morphogenesis

    International Nuclear Information System (INIS)

    Peralta, X G; Toyama, Y; Edwards, G S; Kiehart, D P

    2008-01-01

    Dorsal closure is an essential stage of Drosophila development that is a model system for research in morphogenesis and biological physics. Dorsal closure involves an orchestrated interplay between gene expression and cell activities that produce shape changes, exert forces and mediate tissue dynamics. We investigate the dynamics of dorsal closure based on confocal microscopic measurements of cell shortening in living embryos. During the mid-stages of dorsal closure we find that there are fluctuations in the width of the leading edge cells but the time-averaged analysis of measurements indicate that there is essentially no net shortening of cells in the bulk of the leading edge, that contraction predominantly occurs at the canthi as part of the process for zipping together the two leading edges of epidermis and that the rate constant for zipping correlates with the rate of movement of the leading edges. We characterize emergent properties that regulate dorsal closure, i.e., a velocity governor and the coordination and synchronization of tissue dynamics

  5. A Tale of Many Cities: A Contemporary Historical Study of the Implementation of School Closures during the 2009 pA(H1N1) Influenza Pandemic.

    Science.gov (United States)

    Navarro, J Alexander; Kohl, Katrin S; Cetron, Martin S; Markel, Howard

    2016-06-01

    Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. Copyright © 2016 by Duke University Press.

  6. Efficient synthesis of N-alkyl-2,7-dihalocarbazoles by simultaneous carbazole ring closure and N-alkylation

    Czech Academy of Sciences Publication Activity Database

    Výprachtický, Drahomír; Kmínek, Ivan; Pokorná, Veronika; Cimrová, Věra

    2012-01-01

    Roč. 68, č. 25 (2012), s. 5075-5080 ISSN 0040-4020 R&D Projects: GA MŠk(CZ) 1M06031; GA ČR GAP106/12/0827 Institutional research plan: CEZ:AV0Z40500505 Institutional support: RVO:61389013 Keywords : carbazole ring closure * carbazole alkylation * heterocycles Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 2.803, year: 2012

  7. Economic evaluation of closure cap barrier materials study

    Energy Technology Data Exchange (ETDEWEB)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration.

  8. Economic evaluation of closure cap barrier materials study

    International Nuclear Information System (INIS)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration

  9. Tra il mediterraneo e il fonte battesimale: Musulmani a Napoli nel XVI secolo

    OpenAIRE

    Varriale, Gennaro

    2013-01-01

    Il saggio analizza la presenza di musulmani a Napoli durante il Cinquecento, quando la capitale vive una profonda trasformazione urbanistica, che è vincolata alla immigrazione di comunità esogene e al conflitto contro il Turco. Le ostilità tra la Casa d’Austria e la Sublime Porta condizionano inevitabilmente la vita dei maomettani, che appartengono a tre grandi categorie: schiavi, franchi o esuli. Secondo la propria condizione gli islamici occupano diversi spazi cittadini. I musulmani di Napo...

  10. Key financial ratios can foretell hospital closures.

    Science.gov (United States)

    Lynn, M L; Wertheim, P

    1993-11-01

    An analysis of various financial ratios sampled from open and closed hospitals shows that certain leverage, liquidity, capital efficiency, and resource availability ratios can predict hospital closure up to two years in advance of the closure with an accuracy of nearly 75 percent.

  11. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  12. Hospital closure: Phoenix, Hydra or Titanic?

    Science.gov (United States)

    Dunne, T; Davis, S

    1996-01-01

    Very little has been published about the effects of hospital closure in terms of the service, financial or management issues of the process. Attempts through a case-study format to redress the balance and as such represents the reflections of practitioners who have recently undergone the experience of hospital closure and the often neglected issues arising both during and after the process.

  13. Pianeti tra le note appunti di un astronomo divulgatore

    CERN Document Server

    Adamo, Angelo

    2010-01-01

    Una stella, otto pianeti, un centinaio di lune e una miriade di corpi minori tra plutini, asteroidi, comete, satelliti artificiali. E per ognuno di questi oggetti, spiegazioni scientifiche che condividono la scena con narrazioni dettate dal mito, con visioni della fanstascienza e con suggestioni sonore scaturite dalla penna di grandi compositori. L'autore prova a districarsi nella babele di idiomi più o meno precisi che da sempre vengono usati dagli uomini per descrivere il Sistema Solare nell'intento di spiegarlo e di rendere il freddo spazio interplanetario un posto più accogliente. La letteratura, la fisica, il fumetto, l'illustrazione, la musica finalmente cooperano per delineare un possibile percorso, una traiettoria fra le tante, che condurrà il lettore dalle origini del linguaggio fino alla nube di Oort.

  14. Simulating school closure policies for cost effective pandemic decision making

    Directory of Open Access Journals (Sweden)

    Araz Ozgur M

    2012-06-01

    Full Text Available Abstract Background Around the globe, school closures were used sporadically to mitigate the 2009 H1N1 influenza pandemic. However, such closures can detrimentally impact economic and social life. Methods Here, we couple a decision analytic approach with a mathematical model of influenza transmission to estimate the impact of school closures in terms of epidemiological and cost effectiveness. Our method assumes that the transmissibility and the severity of the disease are uncertain, and evaluates several closure and reopening strategies that cover a range of thresholds in school-aged prevalence (SAP and closure durations. Results Assuming a willingness to pay per quality adjusted life-year (QALY threshold equal to the US per capita GDP ($46,000, we found that the cost effectiveness of these strategies is highly dependent on the severity and on a willingness to pay per QALY. For severe pandemics, the preferred strategy couples the earliest closure trigger (0.5% SAP with the longest duration closure (24 weeks considered. For milder pandemics, the preferred strategies also involve the earliest closure trigger, but are shorter duration (12 weeks for low transmission rates and variable length for high transmission rates. Conclusions These findings highlight the importance of obtaining early estimates of pandemic severity and provide guidance to public health decision-makers for effectively tailoring school closures strategies in response to a newly emergent influenza pandemic.

  15. Potential socio-economic consequences of mine closure

    Directory of Open Access Journals (Sweden)

    Marietjie Ackermann

    2018-01-01

    Full Text Available Background: Mine closures generally reveal negligence on the part of mining houses, not only in terms of the environment, but also the surrounding mining communities. Aim: This article reflects on the findings of research into the socio-economic consequences of mine closure. The research specifically explored how mineworkers’ dependency on their employment at a mine affects their ability to sustain their livelihood. Setting: The research was conducted at the Orkney Mine and the Grootvlei Mine (Springs. Methods: The research was conducted within a naturalistic domain, guided by a relativist orientation, a constructivist ontology and an interpretivist epistemology. Data were collected by means of document analysis, semi-structured interviews, focus group discussion and unstructured observation. Results: From the research findings, it is evident that mine closures, in general, have a devastating effect on the surrounding mining communities as well as on the employees. Mine closures in the case studies gradually depleted the mining communities’ livelihood assets and resulted in the collapse of their coping strategies and livelihood outcomes. It generally affected the communities’ nutrition, health, education, food security, water, shelter, levels of community participation and personal safety. Conclusion: If not managed efficiently and effectively, mine closures may pose significant challenges to the mining industry, government, the environment, national and local economic prosperity and communities in the peripheral areas of mines. This truly amplifies that mine closure, whether temporary or permanent, is an issue that needs to be addressed with responsibility towards all stakeholders, including the mining community and the labour force.

  16. Top closure for control rod drive for nuclear reactor

    International Nuclear Information System (INIS)

    Raas, J.H.; Schwartz, J.I.

    1978-01-01

    A removable top closure and venting assembly for the tubular housing of a control rod drive includes a mounting ring threadably inserted in the upper end of the housing, a fluid-sealing closure member beneath the mounting ring and which is mounted in and coupled to the mounting ring by means of a ball and socket joint, a gas vent defined by interconnecting passages extending through the closure and through the ball and socket joint, and a vent valve accessible from the top of the closure assembly. 3 claims, 2 figures

  17. Transcatheter closure of ventricular septal defect with Occlutech Duct Occluder.

    Science.gov (United States)

    Atik-Ugan, Sezen; Saltik, Irfan Levent

    2018-04-01

    Patent ductus arteriosus occluders are used for transcatheter closure of ventricular septal defects, as well as for closure of patent ductus arteriosus. The Occlutech Duct Occluder is a newly introduced device for transcatheter closure of patent ductus arteriosus. Here, we present a case in which the Occlutech Duct Occluder was successfully used on a patient for the closure of a perimembraneous ventricular septal defect.

  18. A Meta-Analytic Review of the Theories of Reasoned Action and Planned Behavior in Physical Activity: Predictive Validity and the Contribution of Additional Variables.

    Science.gov (United States)

    Hagger, Martin S.; Chatzisarantis, Nikos L. D.; Biddle, Stuart J. H.

    2002-01-01

    Examined relations between behavior, intentions, attitudes, subjective norms, perceived behavioral control, self-efficacy, and past behaviors using the Theories of Reasoned Action (TRA) and Planned Behavior (TPB) in physical activity. This quantitative integration of the physical activity literature supported the major relationships of the…

  19. Seven-year follow-up of percutaneous closure of patent foramen ovale.

    Science.gov (United States)

    Mirzada, Naqibullah; Ladenvall, Per; Hansson, Per-Olof; Johansson, Magnus Carl; Furenäs, Eva; Eriksson, Peter; Dellborg, Mikael

    2013-12-01

    Observational studies favor percutaneous closure of patent foramen ovale (PFO) over medical treatment to reduce recurrent stroke while randomized trials fail to demonstrate significant superiority of percutaneous PFO closure. Few long-term studies are available post PFO closure. This study reports long-term clinical outcomes after percutaneous PFO closure. Between 1997 and 2006, 86 consecutive eligible patients with cerebrovascular events, presumably related to PFO, underwent percutaneous PFO closure. All 86 patients were invited to a long-term follow-up, which was carried out during 2011 and 2012. Percutaneous PFO closure was successfully performed in 85 of 86 patients. The follow-up rate was 100%. No cardiovascular or cerebrovascular deaths occurred. Two patients (both women) died from lung cancer during follow-up. Follow-up visits were conducted for 64 patients and the remaining 20 patients were followed up by phone. The mean follow-up time was 7.3 years (5 to 12.4 years). Mean age at PFO closure was 49 years. One patient had a minor stroke one month after PFO closure and a transient ischemic attack (TIA) two years afterwards. One other patient suffered from a TIA six years after closure. No long-term device-related complications were observed. Percutaneous PFO closure was associated with very low risk of recurrent stroke and is suitable in most patients. We observed no mortality and no long-term device-related complications related to PFO closure, indicating that percutaneous PFO closure is a safe and efficient treatment even in the long term.

  20. Permanent Closure of the TAN-664 Underground Storage Tank

    Energy Technology Data Exchange (ETDEWEB)

    Bradley K. Griffith

    2011-12-01

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  1. Social and macro economic impact of closure

    International Nuclear Information System (INIS)

    Medeliene, D.

    1999-01-01

    The social consequences of closure of Ignalina NPP will largely depend on the actions the Government takes. If it puts in place the conditions which enable the International Financial Institutions to assist Lithuania, both in providing loans and grants for decommissioning and (in the case of the EU) providing Structural Adjustment Funds for the regional economic development of the Visaginas area, then solutions to the problems of closure can be found. But if the Government delays putting into place the necessary conditions, then Lithuania will be left to solve the problems of - inter alia necessary - closure of Ignalina NPP on its own. (author)

  2. Angle closure glaucoma in congenital ectropion uvea

    Directory of Open Access Journals (Sweden)

    Grace M. Wang

    2018-06-01

    Full Text Available Purpose: Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Observations: Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months and required additional surgery (cycloablation or trabeculectomy. Conclusions and importance: Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control. Keywords: Congenital ectropion uvea, Juvenile glaucoma, Angle-closure glaucoma, Glaucoma drainage device

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  4. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the

  5. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): {sm_bullet} CAS 23-21-03, Bldg 750 Surface Discharge {sm_bullet} CAS 23-25-02, Bldg 750 Outfall {sm_bullet} CAS 23-25-03, Bldg 751 Outfall {sm_bullet} CAS 25-60-01, Bldg 3113A Outfall {sm_bullet} CAS 25-60-02, Bldg 3901 Outfall {sm_bullet} CAS 25-62-01, Bldg 3124 Contaminated Soil {sm_bullet} CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH-DRO-, PCB

  6. Subcostal closure technique for prevention of postthoracotomy pain syndrome.

    Science.gov (United States)

    Hong, Kipyo; Bae, Mikyung; Han, Sora

    2016-09-01

    The purpose of this study was to evaluate the efficacy of our subcostal closure technique in prevention of postthoracotomy pain syndrome. From July 2012 to March 2015, 29 patients in whom a lobectomy was indicated underwent a thoracotomy. The thoracotomy wounds were closed using a subcostal closure technique (subcostal closure group) and outcomes were compared with 31 patients who underwent video-assisted thoracoscopic surgery (thoracoscopy group). The duration of oral opioid consumption was evaluated from medical records, and postoperative pain was evaluated by telephone interview conducted by a trained nurse practitioner who was unaware of the patient's group. Pain scores were higher in the thoracoscopy group compared to the subcostal closure group, reaching statistical significance (Numeric Rating Scale 0.55 ± 0.948 in the subcostal closure group vs. 1.84 ± 1.614 in the thoracoscopy group; p Pain Scale 0.24 ± 0.435 in the subcostal closure group vs. 0.81 ± 0.703 in the thoracoscopy group; p pain syndrome. © The Author(s) 2016.

  7. Cyanoacrylate for Intraoral Wound Closure: A Possibility?

    Directory of Open Access Journals (Sweden)

    Parimala Sagar

    2015-01-01

    Full Text Available Wound closure is a part of any surgical procedure and the objective of laceration repair or incision closure is to approximate the edges of a wound so that natural healing process may occur. Over the years new biomaterials have been discovered as an alternate to conventional suture materials. Cyanoacrylate bioadhesives are one among them. They carry the advantages of rapid application, patient comfort, resistance to infection, hemostatic properties, and no suture removal anxiety. Hence this study was undertaken to study the effect of long chain cyanoacrylate as an adhesive for intraoral wound closure and also to explore its hemostatic and antibacterial effects. Isoamyl-2-cyanoacrylate (AMCRYLATE was used as the adhesive in the study. In conclusion isoamyl cyanoacrylate can be used for intraoral wound closure, as an alternative to sutures for gluing the mucoperiosteum to bone, for example, after impaction removal, periapical surgeries, and cleft repair. Its hemostatic and antibacterial activity has to be further evaluated.

  8. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C

  9. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

  10. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  11. Design, production and initial state of the closure

    International Nuclear Information System (INIS)

    2010-12-01

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The production reports are included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the closure and plugs in underground openings other than deposition tunnels for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the engineered barriers once they have been finally placed in the KBS-3 repository and will not be further handled within the repository facility. In addition, the report provides some input to the operational safety report, SR-Operation, on how the closure and plugs shall be handled and installed. The report presents the design premises and reference designs of the closure and plugs and verifies their conformity to the design premises. It also briefly deals with the production of the closure and plugs. Finally, the initial state of the closure and plugs and their conformity to the reference designs and design premises are presented

  12. Design, production and initial state of the closure

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The production reports are included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the closure and plugs in underground openings other than deposition tunnels for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the engineered barriers once they have been finally placed in the KBS-3 repository and will not be further handled within the repository facility. In addition, the report provides some input to the operational safety report, SR-Operation, on how the closure and plugs shall be handled and installed. The report presents the design premises and reference designs of the closure and plugs and verifies their conformity to the design premises. It also briefly deals with the production of the closure and plugs. Finally, the initial state of the closure and plugs and their conformity to the reference designs and design premises are presented

  13. Estudo de resistência à tração de três sistemas adesivos associados a resina composta em superfícies dentinárias

    Directory of Open Access Journals (Sweden)

    MATOS Adriana Bona

    2001-01-01

    Full Text Available Este trabalho teve como objetivo comparar a resistência à tração de três sistemas adesivos associados a resina composta aderidos à superfície dentinária. Quarenta e cinco superfícies de dentina foram obtidas a partir de molares humanos extraídos, sobre elas foi preparado "smear layer" e foram divididas em 3 grupos: G1 adesivo autocondicionante + resina micro-híbrida; G2 adesivo de componente único + ácido e resina micro-híbrida e G3 adesivo convencional (ácido + "primer" + bond + resina micro-híbrida, aplicados de acordo com as instruções dos fabricantes. Os corpos-de-prova foram preparados para teste de tração, imersos em água destilada por 24 horas a 37ºC. Findo este tempo, o teste de tração foi realizado em máquina de ensaio Inströn com velocidade constante de 0,5 mm/min. Os resultados foram expressos em MPa e submetidos a análise de variância (p < 0,05. Os autores concluíram que: o tipo de sistema adesivo influenciou na resistência à tração das resinas compostas testadas; o sistema adesivo de componente único apresentou os melhores resultados de resistência adesiva.

  14. Transcatheter Closure of Patent Foramen Ovale: Devices and Technique.

    Science.gov (United States)

    Price, Matthew J

    2017-10-01

    Transcatheter closure of a patent foramen ovale (PFO) reduces the risk of recurrent cryptogenic stroke compared with medical therapy. PFO closure is a prophylactic procedure, and will not provide the patient with symptomatic improvement, except in cases of hypoxemia due to right-to-left shunt or possibly migraine headaches. Therefore, appropriate patient selection is critical, and procedural safety is paramount. Herein, we review key characteristics of the devices currently available for transcatheter PFO closure within the United States, and highlight key technical aspects of the PFO closure procedure that will maximize procedural success. Copyright © 2017 Elsevier Inc. All rights reserved.

  15. Digital signal processing of data from borehole creep closure

    International Nuclear Information System (INIS)

    Chakrabarti, S.; Patrick, W.C.; Duplancic, N.

    1987-01-01

    Digital signal processing, a technique commonly used in the fields of electrical engineering and communication technology, has been successfully used to analyze creep closure data obtained from a 0.91 m diameter by 5.13 deep borehole in bedded salt. By filtering the ''noise'' component of the closure data from a test borehole, important data trends were made more evident and average creep closure rates were able to be calculated. This process provided accurate estimates of closure rates that are used in the design of lined boreholes in which heat-generating transuranic nuclear wastes are emplaced at the Waste Isolation Pilot Plant

  16. 40 CFR 264.119 - Post-closure notices.

    Science.gov (United States)

    2010-07-01

    ...) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Closure... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... disposal unit of the facility. For hazardous wastes disposed of before January 12, 1981, the owner or...

  17. A closure test for time-specific capture-recapture data

    Science.gov (United States)

    Stanley, T.R.; Burnham, K.P.

    1999-01-01

    The assumption of demographic closure in the analysis of capture-recapture data under closed-population models is of fundamental importance. Yet, little progress has been made in the development of omnibus tests of the closure assumption. We present a closure test for time-specific data that, in principle, tests the null hypothesis of closed-population model M(t) against the open-population Jolly-Seber model as a specific alternative. This test is chi-square, and can be decomposed into informative components that can be interpreted to determine the nature of closure violations. The test is most sensitive to permanent emigration and least sensitive to temporary emigration, and is of intermediate sensitivity to permanent or temporary immigration. This test is a versatile tool for testing the assumption of demographic closure in the analysis of capture-recapture data.

  18. Reliability in maintenance and design of elastomer sealed closures

    International Nuclear Information System (INIS)

    Lake, W.H.

    1978-01-01

    The methods of reliability are considered for maintenance and design of elastomer sealed containment closures. Component reliability is used to establish a replacement schedule for system maintenance. Reliability data on elastomer seals is used to evaluate the common practice of annual replacement, and to calculate component reliability values for several typical shipment time periods. System reliability methods are used to examine the relative merits of typical closure designs. These include single component and redundant seal closure, with and without closure verification testing. The paper presents a general method of quantifying the merits of closure designs through the use of reliability analysis, which is a probabilistic technique. The reference list offers a general source of information in the field of reliability, and should offer the opportunity to extend the procedures discussed in this paper to other design safety applications

  19. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  20. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed

  1. RELAP-7 Closure Correlations

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Ling [Idaho National Lab. (INL), Idaho Falls, ID (United States); Berry, R. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Martineau, R. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Andrs, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Zhang, H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hansel, J. E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sharpe, J. P. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Johns, Russell C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-04-01

    The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 code utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.

  2. The effectiveness of eye-closure in repeated interviews

    OpenAIRE

    Vredeveldt, A.; Baddeley, A.D.; Hitch, G.J.

    2014-01-01

    Purpose Closing the eyes during recall can help witnesses remember more about a witnessed event. This study examined the effectiveness of eye-closure in a repeated recall paradigm with immediate free recall followed 1 week later by both free and cued recall. We examined whether eye-closure was more or less effective during the second free-recall attempt compared with the first, whether eye-closure during the first recall attempt had an impact on subsequent free- and cued-recall performance, a...

  3. Closure of the squared Zakharov--Shabat eigenstates

    International Nuclear Information System (INIS)

    Kaup, D.J.

    1976-01-01

    By solution of the inverse scattering problem for a third-order (degenerate) eigenvalue problem, the closure of the squared eigenfunctions of the Zakharov--Shabat equations is found. The question of the completeness of squared eigenstates occurs in many aspects of ''inverse scattering transforms'' (solving nonlinear evolution equations exactly by inverse scattering techniques), as well as in various aspects of the inverse scattering problem. The method used here is quite suggestive as to how one might find the closure of the squared eigenfunctions of other eigenvalue equations, and the strong analogy between these results and the problem of finding the closure of the eigenvectors of a nonself-adjoint matrix is pointed out

  4. Conjugative Plasmid Transfer in Xylella fastidiosa Is Dependent on tra and trb Operon Functions

    OpenAIRE

    Burbank, Lindsey P.; Van Horn, Christopher R.

    2017-01-01

    The insect-transmitted plant pathogen Xylella fastidiosa is capable of efficient horizontal gene transfer (HGT) and recombination. Natural transformation occurs at high rates in X. fastidiosa, but there also is evidence that certain strains of X. fastidiosa carry native plasmids equipped with transfer and mobilization genes, suggesting conjugation as an additional mechanism of HGT in some instances. Two operons, tra and trb, putatively encoding a conjugative type IV secretion system, are foun...

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  6. The Office of Site Closure: Progress in the Face of Challenges

    International Nuclear Information System (INIS)

    Fiore, J. J.; Murphie, W. E.; Meador, S. W.

    2002-01-01

    The Office of Site Closure (OSC) was formed in November 1999 when the Department of Energy's (DOE's) Office of Environmental Management (EM) reorganized to focus specifically on site cleanup and closure. OSC's objective is to achieve safe and cost-effective cleanups and closures that are protective of our workers, the public, and the environment, now and in the future. Since its inception, OSC has focused on implementing a culture of safe closure, with emphasis in three primary areas: complete our responsibility for the Closure Sites Rocky Flats, Mound, Fernald, Ashtabula, and Weldon Spring; complete our responsibility for cleanup at sites where the DOE mission has been completed (examples include Battelle King Avenue and Battelle West Jefferson in Columbus, and General Atomics) or where other Departmental organizations have an ongoing mission (examples include the Brookhaven, Livermore, or Los Alamos National Laboratories, and the Nevada Test Site); and create a framework a nd develop specific business closure tools that will help sites close, such as guidance for and decisions on post-contract benefit liabilities, records retention, and Federal employee incentives for site closure. This paper discusses OSC's 2001 progress in achieving site cleanups, moving towards site closure, and developing specific business closure tools to support site closure. It describes the tools used to achieve progress towards cleanup and closure, such as the application of new technologies, changes in contracting approaches, and the development of agreements between sites and with host states. The paper also identifies upcoming challenges and explores options for how Headquarters and the sites can work together to address these challenges. Finally, it articulates OSC's new focus on oversight of Field Offices to ensure they have the systems in place to oversee contractor activities resulting in site cleanups and closures

  7. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  8. Stomal Closure: Strategies to Prevent Incisional Hernia

    Science.gov (United States)

    Harries, Rhiannon L.; Torkington, Jared

    2018-01-01

    Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias. PMID:29670882

  9. Stomal Closure: Strategies to Prevent Incisional Hernia

    Directory of Open Access Journals (Sweden)

    Rhiannon L. Harries

    2018-04-01

    Full Text Available Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias.

  10. Pathways of topological rank analysis (PoTRA: a novel method to detect pathways involved in hepatocellular carcinoma

    Directory of Open Access Journals (Sweden)

    Chaoxing Li

    2018-04-01

    Full Text Available Complex diseases such as cancer are usually the result of a combination of environmental factors and one or several biological pathways consisting of sets of genes. Each biological pathway exerts its function by delivering signaling through the gene network. Theoretically, a pathway is supposed to have a robust topological structure under normal physiological conditions. However, the pathway’s topological structure could be altered under some pathological condition. It is well known that a normal biological network includes a small number of well-connected hub nodes and a large number of nodes that are non-hubs. In addition, it is reported that the loss of connectivity is a common topological trait of cancer networks, which is an assumption of our method. Hence, from normal to cancer, the process of the network losing connectivity might be the process of disrupting the structure of the network, namely, the number of hub genes might be altered in cancer compared to that in normal or the distribution of topological ranks of genes might be altered. Based on this, we propose a new PageRank-based method called Pathways of Topological Rank Analysis (PoTRA to detect pathways involved in cancer. We use PageRank to measure the relative topological ranks of genes in each biological pathway, then select hub genes for each pathway, and use Fisher’s exact test to test if the number of hub genes in each pathway is altered from normal to cancer. Alternatively, if the distribution of topological ranks of gene in a pathway is altered between normal and cancer, this pathway might also be involved in cancer. Hence, we use the Kolmogorov–Smirnov test to detect pathways that have an altered distribution of topological ranks of genes between two phenotypes. We apply PoTRA to study hepatocellular carcinoma (HCC and several subtypes of HCC. Very interestingly, we discover that all significant pathways in HCC are cancer-associated generally, while several

  11. Tank waste remediation system vadose zone program plan

    International Nuclear Information System (INIS)

    Fredenburg, E.A.

    1998-01-01

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities

  12. Tank waste remediation system vadose zone program plan

    Energy Technology Data Exchange (ETDEWEB)

    Fredenburg, E.A.

    1998-07-27

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

  13. Case Report: Rapid staged abdominal closure using Gore-Tex® mesh as a bridge to primary omphalocele sac closure

    Directory of Open Access Journals (Sweden)

    William C. Kethman

    2016-06-01

    Full Text Available Omphaloceles present an ongoing challenge due to significant variations in presentation and associated co-morbidities. Diverse management strategies have been described to tackle many of the fundamental challenges of closure and reconstruction of the abdominal wall – this fact demonstrates a need for increasingly individualized management options for this complex disease. We describe a novel method of rapid staged abdominal wall closure using Gore-Tex® mesh as a bridge to primary omphalocele closure in an infant with partial Pentalogy of Cantrell and giant ruptured omphalocele. This strategy can be used in management of some of the most complex abdominal wall defects.

  14. Bidirectional Barbed Sutures for Wound Closure: Evolution and Applications

    Science.gov (United States)

    Paul, Malcolm D.

    2009-01-01

    Traditionally, wound closure sutures have in common the need to tie knots with the inherent risk of extrusion, palpability, microinfarcts, breakage, and slippage. Bidirectional barbed sutures have barbs arrayed in a helical fashion in opposing directions on either side of an unbarbed midsegment. This suture is inserted at the midpoint of a wound and pulled through till resistance is encountered from the opposing barbs; each half of the suture is then advanced to the lateral ends of the wound. This design provides a method of evenly distributing tension along the incision line, a faster suture placement and closure time with no need to tie knots, and the possibility of improved cosmesis. Bidirectional barbed sutures, which are available in both absorbable and nonabsorbable forms, can be used for simple closures, multilayered closures, and closure of high-tension wounds in a variety of surgical settings. PMID:24527114

  15. Primary angle closure glaucoma in a myopic kinship.

    Science.gov (United States)

    Hagan, J C; Lederer, C M

    1985-03-01

    Three related myopic individuals with primary angle closure glaucoma are reported. They had true myopia and not pseudomyopia secondary to increased lenticular index of refraction. We believe one of these individuals (-8.62 spherical equivalent) to have the most myopic case of primary angle closure glaucoma reported in the literature. Although myopia is associated with anatomical factors that offer considerable protection from primary angle closure glaucoma, its presence does not eliminate the possibility of this disease. Laser iridectomy was effective in the treatment of these patients.

  16. Closure of a mixed waste landfill: Lessons learned

    International Nuclear Information System (INIS)

    Phifer, M.A.

    1990-01-01

    Much experience has been gained during the closure of the Mixed Waste Management Facility (MWMF) at the Savannah River Site (SRS) and many lessons were learned. This knowledge was applied to other closures at SRS yielding decreased costs, schedule enhancement, and increased overall project efficiency. The next major area of experience to be gained at SRS in the field of waste site closures will be in the upkeep, maintenance, and monitoring of clay caps. Further test programs will be required to address these requirements

  17. Influence of Closure & Non-Closure of the Visceral and Parietal Peritoneum on Post Cesarean Morbidity

    Directory of Open Access Journals (Sweden)

    Tabasi Z.

    2010-01-01

    Full Text Available AbstractBackground and Objectives: One of the most important issues in promoting mother and child health is reducing the morbidity rate after cesarean section. The aim of this study was to investigate the influence of closure and non-closure of the visceral and parietal peritoneum on post cesarean morbidity in women attending Shabihkhani Maternity Hospital in Kashan, Iran.Methods: This study was conducted with a single blind randomized clinical trial method on 100 parturient women that underwent emergency or elective cesarean section. Patients with previous cesarean section and or abdominal surgery, diseases such as hypertension, diabetes mellitus and premature rupture of membrane and pre operative bleeding, were excluded from this study. Then, the participants were randomly divided into two groups: in one group both peritoneal layers were closed while in the other group, they were not closed. Post operative morbidity including fever, bleeding, post operative pain, analgesic consumption and time of operation were assessed. Data were analyzed with t-tests, and χ2 and a P<0.05 were considered significant.Results: In this study, there were no significant differences between the two groups with respect to age, gestational age, the reason for caesarean section and gravidity, nor were there any differences with respect to the incidence of fever or bleeding and was similar between the two groups, but there was a significant difference between the two groups regarding to feeling of severe pain (P=0.0003, analgesic consumption (P=0.0003 and time of operation (P=0.004. In the non-closure group, dose of analgesic drugs, pain severity and time of operation were less than those of the other group.Conclusion: The Findings showed that non-closure of peritoneal layers as a shorter and simpler procedure has no influence on increasing post cesarean morbidity. Therefore, due to maternal health promotion and early neonatal breastfeeding, non closure of peritoneal

  18. A RCRA clean closure of a unique site - Kerr Hollow quarry at the Y-12 Plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Yemington, C.

    1991-01-01

    An abandoned rock quarry, Kerr Hollow Quarry (KHQ), near the DOE Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, was used from 1951-1988 as a site to treat RCRA wastes which were reactive, corrosive, or ignitable and which posed major concerns for personnel safety. The wastes were generated from operations at the Y-12 Plant and Oak Ridge National Laboratory and were previously treated by allowing the wastes to react with the water in KHQ. When closure of the site was required by the RCRA regulations, a closure method was selected to allow for clean closure of the quarry without treatment or removal of the water in KHQ. The method proposed to and approved by the Tennessee Department of Health and Environment (TDHE) was one of surveying the containers in the quarry by a submersible Remotely Operated Vehicle (ROV) using sonar and visually inspecting the containers by camera to confirm that all containers are breached and empty. Any container found intact would be breached to allow the contents to react with water and form non-hazardous residue. The progress of this unique type of closure is presented along with a summary of the problems encountered, planning activities, equipment utilized and other information about the closure. All work was done with remotely operated equipment. This work is being performed by Sonsub, Inc. This closure project showed the practicality and cost benefits of telerobotic systems for work on hazardous waste sites. In addition to the intangible benefit of reduced exposure of workers, insurance costs are much lower and efficiency is higher. Daily start-up time is reduced since there is no need to don protective suits or other gear. Productivity is higher since personnel work only in clean areas where they are not hampered by protective gear. Cleanup time at shift end is minimized since the remote equipment does not leave the hazardous area and personnel need not go through decontamination

  19. The dry closure of Almagrera tailings dam; La clausura seca de la presa de residuos mineros de Almagrera

    Energy Technology Data Exchange (ETDEWEB)

    Justo Alpanes, J. L. de; Durand Neyra, P.; Abel Jimenez, F.; Vazquez Boza, M

    2012-07-01

    After the catastrophic failures of Los Frailes dam at Aznalcollar (Huesca), sensitivity towards the safety of mineral waste deposits in Spain, has increased, forcing mining companies to submit in advance a plan for mine closure when the end of exploitation arrives. However, today the Spanish Autonomous Communities are forced to solve the problem of closure of abandoned mines and tailings dams like Almagrera. We present a mechanical model that reproduces all the operations necessary for the dry closure of Almagrera dam, 37.34 meters high. These operations correspond to aspects such as: a. The placement, above the tailings, of toxic coarse mineral residues, thereby reducing the volume of mining dumps. b. Methods to speed up settlements before placing the cover and, this way, prevent damage to it; for example the placement of band-shaped drains, inside the tailings, after the fill has been placed on them. c. This possible liquefaction of tailings during an earthquake. The model has indicated the necessity of placing rock fill reinforcement downstream. (Author) 6 refs.

  20. Hamiltonian closures in fluid models for plasmas

    Science.gov (United States)

    Tassi, Emanuele

    2017-11-01

    This article reviews recent activity on the Hamiltonian formulation of fluid models for plasmas in the non-dissipative limit, with emphasis on the relations between the fluid closures adopted for the different models and the Hamiltonian structures. The review focuses on results obtained during the last decade, but a few classical results are also described, in order to illustrate connections with the most recent developments. With the hope of making the review accessible not only to specialists in the field, an introduction to the mathematical tools applied in the Hamiltonian formalism for continuum models is provided. Subsequently, we review the Hamiltonian formulation of models based on the magnetohydrodynamics description, including those based on the adiabatic and double adiabatic closure. It is shown how Dirac's theory of constrained Hamiltonian systems can be applied to impose the incompressibility closure on a magnetohydrodynamic model and how an extended version of barotropic magnetohydrodynamics, accounting for two-fluid effects, is amenable to a Hamiltonian formulation. Hamiltonian reduced fluid models, valid in the presence of a strong magnetic field, are also reviewed. In particular, reduced magnetohydrodynamics and models assuming cold ions and different closures for the electron fluid are discussed. Hamiltonian models relaxing the cold-ion assumption are then introduced. These include models where finite Larmor radius effects are added by means of the gyromap technique, and gyrofluid models. Numerical simulations of Hamiltonian reduced fluid models investigating the phenomenon of magnetic reconnection are illustrated. The last part of the review concerns recent results based on the derivation of closures preserving a Hamiltonian structure, based on the Hamiltonian structure of parent kinetic models. Identification of such closures for fluid models derived from kinetic systems based on the Vlasov and drift-kinetic equations are presented, and