WorldWideScience

Sample records for total project costs

  1. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  2. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  3. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  4. Process Improvement Project Using Tranexamic Acid Is Cost-Effective in Reducing Blood Loss and Transfusions After Total Hip and Total Knee Arthroplasty.

    Science.gov (United States)

    Demos, Harry A; Lin, Zilan X; Barfield, William R; Wilson, Sylvia H; Robertson, Dawn C; Pellegrini, Vincent D

    2017-08-01

    Tranexamic acid (TXA) has been associated with decreased blood loss and transfusion after total hip arthroplasty (THA) and total knee arthroplasty (TKA). The purpose of this study was to examine both transfusion utilization and the economic impact of a Process Improvement Project implementing TXA for THA and TKA. After standardization of TXA administration in THA and TKA patients, retrospective data were compared from 12 consecutive months before (group A, n = 336 procedures) and after (group B, n = 436 procedures) project initiation. TXA administration increased with project implementation (group A = 3.57%, group B = 86.01%) and was associated with reductions in perioperative hemoglobin decrement (20.2%), patients transfused (45%), and number of units transfused per patient (61.9%). Cost savings were notable per patient ($128) and annually program wide ($55,884) with the primary THA subgroup contributing the most to the savings. No increase in adverse effects was observed. Standardized administration of TXA is an effective and economically favorable blood-reduction strategy for patients undergoing elective THA or TKA. Although reduction in transfusions with TXA may be greater after TKA, the economic and clinical impact of transfusion reduction is more substantial in THA patients. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  6. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  7. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  8. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL

    Directory of Open Access Journals (Sweden)

    Fernando Henrique Lermen

    2016-09-01

    Full Text Available The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.

  9. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  10. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  11. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  13. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  14. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  15. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  16. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  17. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  18. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  19. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  20. 14 CFR 151.41 - Project costs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...

  1. Assessing the Total cost of ownership of ERP systems : Case study analysis on the factors behind customer costs in recent minor implementations

    OpenAIRE

    Rydgård, Göran; Palmberg, Nils

    2010-01-01

    This master’s thesis presents a model for calculating the total cost of ownership (TCO) of relatively small ERP implementations, including two years of running the system. The main factors affecting the cost items in the model are also analyzed, based in part on four case projects that the consultancy company Acando has carried out recently and in part on literature. The case projects were investigated through interviews with key actors in the projects from Acando and the customer, and throug...

  2. Estimating Total Program Cost of a Long-Term, High-Technology, High-Risk Project with Task Durations and Costs That May Increase Over Time

    National Research Council Canada - National Science Library

    Brown, Gerald G; Grose, Roger T; Koyak, Robert A

    2006-01-01

    .... Each task suffers some risk of delay and changed cost. Ignoring budget constraints, we use Monte Carlo simulation of the duration of each task in the project to infer the probability distribution of the project completion time...

  3. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  4. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  5. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  6. Total Cost of Ownership and Cost-to-Serve

    DEFF Research Database (Denmark)

    Zachariassen, Frederik

    2007-01-01

    Artiklen reviewer den eksisterende litteratur vedrørende økonomistyringsværktøjerne Total Cost of Ownership (TCO) og Cost-to-Serve (CtS). Herefter kortlægges det, hvordan TCO og CtS bidrager til en identificering af direkte omkostninger såvel som indirekte omkostninger henholdsvis up-stream og down...

  7. Research on the Investment Costs of IT Project

    Science.gov (United States)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  8. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  9. Total generating costs: coal and nuclear plants

    International Nuclear Information System (INIS)

    1979-02-01

    The study was confined to single and multi-unit coal- and nuclear-fueled electric-generating stations. The stations are composed of 1200-MWe PWRs; 1200-MWe BWRs; 800-and 1200-MWe High-Sulfur Coal units, and 800- and 1200-MWe Low-Sulfur Coal units. The total generating cost estimates were developed for commercial operation dates of 1985 and 1990; for 5 and 8% escalation rates, for 10 and 12% discount rates; and, for capacity factors of 50, 60, 70, and 80%. The report describes the methodology for obtaining annualized capital costs, levelized coal and nuclear fuel costs, levelized operation and maintenance costs, and the resulting total generating costs for each type of station. The costs are applicable to a hypothetical Middletwon site in the Northeastern United States. Plant descriptions with general design parameters are included. The report also reprints for convenience, summaries of capital cost by account type developed in the previous commercial electric-power cost studies. Appropriate references are given for additional detailed information. Sufficient detail is given to allow the reader to develop total generating costs for other cases or conditions

  10. Effects of the Length of Stay on the Cost of Total Knee and Total Hip Arthroplasty from 2002 to 2013.

    Science.gov (United States)

    Molloy, Ilda B; Martin, Brook I; Moschetti, Wayne E; Jevsevar, David S

    2017-03-01

    Utilization of total knee and hip arthroplasty has greatly increased in the past decade in the United States; these are among the most expensive procedures in patients with Medicare. Advances in surgical techniques, anesthesia, and care pathways decrease hospital length of stay. We examined how trends in hospital cost were altered by decreases in length of stay. Procedure, demographic, and economic data were collected on 6.4 million admissions for total knee arthroplasty and 2.8 million admissions for total hip arthroplasty from 2002 to 2013 using the National (Nationwide) Inpatient Sample, a component of the Healthcare Cost and Utilization Project. Trends in mean hospital costs and their association with length of stay were estimated using inflation-adjusted, survey-weighted generalized linear regression models, controlling for patient demographic characteristics and comorbidity. From 2002 to 2013, the length of stay decreased from a mean time of 4.06 to 2.97 days for total knee arthroplasty and from 4.06 to 2.75 days for total hip arthroplasty. During the same time period, the mean hospital cost for total knee arthroplasty increased from $14,988 (95% confidence interval [CI], $14,927 to $15,049) in 2002 to $22,837 (95% CI, $22,765 to $22,910) in 2013 (an overall increase of $7,849 or 52.4%). The mean hospital cost for total hip arthroplasty increased from $15,792 (95% CI, $15,706 to $15,878) in 2002 to $23,650 (95% CI, $23,544 to $23,755) in 2013 (an increase of $7,858 or 49.8%). If length of stay were set at the 2002 mean, the growth in cost for total knee arthroplasty would have been 70.8% instead of 52.4% as observed, and the growth in cost for total hip arthroplasty would have been 67.4% instead of 49.8% as observed. Hospital costs for joint replacement increased from 2002 to 2013, but were attenuated by reducing inpatient length of stay. With demographic characteristics showing an upward trend in the utilization of joint arthroplasty, including a shift

  11. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  12. Cost-identification analysis of total laryngectomy: an itemized approach to hospital costs.

    Science.gov (United States)

    Dedhia, Raj C; Smith, Kenneth J; Weissfeld, Joel L; Saul, Melissa I; Lee, Steve C; Myers, Eugene N; Johnson, Jonas T

    2011-02-01

    To understand the contribution of intraoperative and postoperative hospital costs to total hospital costs, examine the costs associated with specific hospital services in the postoperative period, and recognize the impact of patient factors on hospital costs. Case series with chart review. Large tertiary care teaching hospital system. Using the Pittsburgh Head and Neck Organ-Specific Database, 119 patients were identified as having total laryngectomy with bilateral selective neck dissection and primary closure from 1999 to 2009. Cost data were obtained for 112 patients. Costs include fixed and variable costs, adjusted to 2010 US dollars using the Consumer Price Index. Mean total hospital costs were $29,563 (range, $10,915 to $120,345). Operating room costs averaged 24% of total hospital costs, whereas room charges, respiratory therapy, laboratory, pharmacy, and radiology accounted for 38%, 14%, 8%, 7%, and 3%, respectively. Median length of stay was 9 days (range, 6-43), and median Charlson comorbidity index score was 8 (2-16). Patients with ≥1 day in the intensive care unit had significantly higher hospital costs ($46,831 vs $24,601, P cost differences with stratification based on previous radiation therapy ($27,598 vs $29,915 with no prior radiation, P = .62) or hospital readmission within 30 days ($29,483 vs $29,609 without readmission, P = .97). This is one of few studies in surgery and the first in otolaryngology to analyze hospital costs for a relatively standardized procedure. Further work will include cost analysis from multiple centers with investigation of global cost drivers.

  13. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  14. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  15. Alcoholism treatment and medical care costs from Project MATCH.

    Science.gov (United States)

    Holder, H D; Cisler, R A; Longabaugh, R; Stout, R L; Treno, A J; Zweben, A

    2000-07-01

    This paper examines the costs of medical care prior to and following initiation of alcoholism treatment as part of a study of patient matching to treatment modality. Longitudinal study with pre- and post-treatment initiation. The total medical care costs for inpatient and outpatient treatment for patients participating over a span of 3 years post-treatment. Three treatment sites at two of the nine Project MATCH locations (Milwaukee, WI and Providence, RI). Two hundred and seventy-nine patients. Patients were randomly assigned to one of three treatment modalities: a 12-session cognitive behavioral therapy (CBT), a four-session motivational enhancement therapy (MET) or a 12-session Twelve-Step facilitation (TSF) treatment over 12 weeks. Total medical care costs declined from pre- to post-treatment overall and for each modality. Matching effects independent of clinical prognosis showed that MET has potential for medical-care cost-savings. However, patients with poor prognostic characteristics (alcohol dependence, psychiatric severity and/or social network support for drinking) have better cost-savings potential with CBT and/or TSF. Matching variables have significant importance in increasing the potential for medical-care cost-reductions following alcoholism treatment.

  16. 10 CFR 611.102 - Eligible project costs.

    Science.gov (United States)

    2010-01-01

    ... Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to... 10 Energy 4 2010-01-01 2010-01-01 false Eligible project costs. 611.102 Section 611.102 Energy... PROGRAM Direct Loan Program § 611.102 Eligible project costs. (a) Eligible costs are: (1) Those costs that...

  17. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  18. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  19. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  20. Reverse-total shoulder arthroplasty cost-effectiveness: A quality-adjusted life years comparison with total hip arthroplasty.

    Science.gov (United States)

    Bachman, Daniel; Nyland, John; Krupp, Ryan

    2016-02-18

    To compare reverse-total shoulder arthroplasty (RSA) cost-effectiveness with total hip arthroplasty cost-effectiveness. This study used a stochastic model and decision-making algorithm to compare the cost-effectiveness of RSA and total hip arthroplasty. Fifteen patients underwent pre-operative, and 3, 6, and 12 mo post-operative clinical examinations and Short Form-36 Health Survey completion. Short form-36 Health Survey subscale scores were converted to EuroQual Group Five Dimension Health Outcome scores and compared with historical data from age-matched patients who had undergone total hip arthroplasty. Quality-adjusted life year (QALY) improvements based on life expectancies were calculated. The cost/QALY was $3900 for total hip arthroplasty and $11100 for RSA. After adjusting the model to only include shoulder-specific physical function subscale items, the RSA QALY improved to 2.8 years, and its cost/QALY decreased to $8100. Based on industry accepted standards, cost/QALY estimates supported both RSA and total hip arthroplasty cost-effectiveness. Although total hip arthroplasty remains the quality of life improvement "gold standard" among arthroplasty procedures, cost/QALY estimates identified in this study support the growing use of RSA to improve patient quality of life.

  1. Impact Of Health Care Delivery System Innovations On Total Cost Of Care.

    Science.gov (United States)

    Smith, Kevin W; Bir, Anupa; Freeman, Nikki L B; Koethe, Benjamin C; Cohen, Julia; Day, Timothy J

    2017-03-01

    Using delivery system innovations to advance health care reform continues to be of widespread interest. However, it is difficult to generalize about the success of specific types of innovations, since they have been examined in only a few studies. To gain a broader perspective, we analyzed the results of forty-three ambulatory care programs funded by the first round of the Center for Medicare and Medicaid Innovation's Health Care Innovations Awards. The innovations' impacts on total cost of care were estimated by independent evaluators using multivariable difference-in-differences models. Through the first two years, most of the innovations did not show a significant effect on total cost of care. Using meta-regression, we assessed the effects on costs of five common components of these innovations. Innovations that used health information technology or community health workers achieved the greatest cost savings. Savings were also relatively large in programs that targeted clinically fragile patients-clinically complex populations at risk for disease progression. While the magnitude of these effects was often substantial, none achieved conventional levels of significance in our analyses. Meta-analyses of a larger number of delivery system innovations are needed to more clearly establish their potential for patient care cost savings. Project HOPE—The People-to-People Health Foundation, Inc.

  2. Total medical costs of treating femoral neck fracture patients with hemi- or total hip arthroplasty: a cost analysis of a multicenter prospective study

    NARCIS (Netherlands)

    P.T.P.W. Burgers (Paul); M. Hoogendoorn (Martine); E.A.C. Van Woensel; R.W. Poolman (Rudolf); M. Bhandari (Mohit); P. Patka (Peter); E.M.M. van Lieshout (Esther)

    2016-01-01

    textabstractSummary: The aim of this study was to determine the total medical costs for treating displaced femoral neck fractures with hemi- or total hip arthroplasty in fit elderly patients. The mean total costs per patient at 2 years of follow-up were €26,399. These results contribute to cost

  3. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  4. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  5. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  6. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  7. Economics of human performance and systems total ownership cost.

    Science.gov (United States)

    Onkham, Wilawan; Karwowski, Waldemar; Ahram, Tareq Z

    2012-01-01

    Financial costs of investing in people is associated with training, acquisition, recruiting, and resolving human errors have a significant impact on increased total ownership costs. These costs can also affect the exaggerate budgets and delayed schedules. The study of human performance economical assessment in the system acquisition process enhances the visibility of hidden cost drivers which support program management informed decisions. This paper presents the literature review of human total ownership cost (HTOC) and cost impacts on overall system performance. Economic value assessment models such as cost benefit analysis, risk-cost tradeoff analysis, expected value of utility function analysis (EV), growth readiness matrix, multi-attribute utility technique, and multi-regressions model were introduced to reflect the HTOC and human performance-technology tradeoffs in terms of the dollar value. The human total ownership regression model introduces to address the influencing human performance cost component measurement. Results from this study will increase understanding of relevant cost drivers in the system acquisition process over the long term.

  8. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  9. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  10. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  11. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  12. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  13. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  14. Reducing Length of Stay, Direct Cost, and Readmissions in Total Joint Arthroplasty Patients With an Outcomes Manager-Led Interprofessional Team.

    Science.gov (United States)

    Arana, Melissa; Harper, Licia; Qin, Huanying; Mabrey, Jay

    The purpose of this quality improvement project was to determine whether an outcomes manager-led interprofessional team could reduce length of stay and direct cost without increasing 30-day readmission rates in the total joint arthroplasty patient population. The goal was to promote interprofessional relationships combined with collaborative practice to promote coordinated care with improved outcomes. Results from this project showed that length of stay (total hip arthroplasty [THA] reduced by 0.4 days and total knee arthroplasty [TKA] reduced by 0.6 days) and direct cost (THA reduced by $1,020 per case and TKA reduced by $539 per case) were significantly decreased whereas 30-day readmission rates of both populations were not significantly increased.

  15. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  16. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  17. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  18. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  19. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  20. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  1. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  2. Direct cost comparison of totally endoscopic versus open ear surgery.

    Science.gov (United States)

    Patel, N; Mohammadi, A; Jufas, N

    2018-02-01

    Totally endoscopic ear surgery is a relatively new method for managing chronic ear disease. This study aimed to test the null hypothesis that open and endoscopic approaches have similar direct costs for the management of attic cholesteatoma, from an Australian private hospital setting. A retrospective direct cost comparison of totally endoscopic ear surgery and traditional canal wall up mastoidectomy for the management of attic cholesteatoma in a private tertiary setting was undertaken. Indirect and future costs were excluded. A direct cost comparison of anaesthetic setup and resources, operative setup and resources, and surgical time was performed between the two techniques. Totally endoscopic ear surgery has a mean direct cost reduction of AUD$2978.89 per operation from the hospital perspective, when compared to canal wall up mastoidectomy. Totally endoscopic ear surgery is more cost-effective, from an Australian private hospital perspective, than canal wall up mastoidectomy for attic cholesteatoma.

  3. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  4. Cost-Benefit Study of a Project to Lower Cost and Improve Fleet Readiness through Integrating the Management of Technical Information

    OpenAIRE

    Levine, Dan

    2010-01-01

    Proceedings Paper (for Acquisition Research Program) Approved for public release; distribution unlimited. This paper describes a cost-benefit analysis by the Institute for Defense Analyses of the ''Bridge Project'' that ADL (Advanced Distributed Learning) is conducting for the Office of Secretary of Defense for Acquisition, Technology and Logistics (OSD(AT&L) to improve the management of Integrated Logistics Support (ILS). The Project is part of the OSD RTOC program (Reduction in Total ...

  5. Total cost of ownership of electric vehicles compared to conventional vehicles: A probabilistic analysis and projection across market segments

    International Nuclear Information System (INIS)

    Wu, Geng; Inderbitzin, Alessandro; Bening, Catharina

    2015-01-01

    While electric vehicles (EV) can perform better than conventional vehicles from an environmental standpoint, consumers perceive them to be more expensive due to their higher capital cost. Recent studies calculated the total cost of ownership (TCO) to evaluate the complete cost for the consumer, focusing on individual vehicle classes, powertrain technologies, or use cases. To provide a comprehensive overview, we built a probabilistic simulation model broad enough to capture most of a national market. Our findings indicate that the comparative cost efficiency of EV increases with the consumer's driving distance and is higher for small than for large vehicles. However, our sensitivity analysis shows that the exact TCO is subject to the development of vehicle and operating costs and thus uncertain. Although the TCO of electric vehicles may become close to or even lower than that of conventional vehicles by 2025, our findings add evidence to past studies showing that the TCO does not reflect how consumers make their purchase decision today. Based on these findings, we discuss policy measures that educate consumers about the TCO of different vehicle types based on their individual preferences. In addition, measures improving the charging infrastructure and further decreasing battery cost are discussed. - Highlights: • Calculates the total cost of ownership across competing vehicle technologies. • Uses Monte Carlo simulation to analyse distributions and probabilities of outcomes. • Contains a comprehensive assessment across the main vehicle classes and use cases. • Indicates that cost efficiency of technology depends on vehicle class and use case. • Derives specific policy measures to facilitate electric vehicle diffusion

  6. The Cost of Joint Replacement: Comparing Two Approaches to Evaluating Costs of Total Hip and Knee Arthroplasty.

    Science.gov (United States)

    Palsis, John A; Brehmer, Thomas S; Pellegrini, Vincent D; Drew, Jacob M; Sachs, Barton L

    2018-02-21

    In an era of mandatory bundled payments for total joint replacement, accurate analysis of the cost of procedures is essential for orthopaedic surgeons and their institutions to maintain viable practices. The purpose of this study was to compare traditional accounting and time-driven activity-based costing (TDABC) methods for estimating the total costs of total hip and knee arthroplasty care cycles. We calculated the overall costs of elective primary total hip and total knee replacement care cycles at our academic medical center using traditional and TDABC accounting methods. We compared the methods with respect to the overall costs of hip and knee replacement and the costs for each major cost category. The traditional accounting method resulted in higher cost estimates. The total cost per hip replacement was $22,076 (2014 USD) using traditional accounting and was $12,957 using TDABC. The total cost per knee replacement was $29,488 using traditional accounting and was $16,981 using TDABC. With respect to cost categories, estimates using traditional accounting were greater for hip and knee replacement, respectively, by $3,432 and $5,486 for personnel, by $3,398 and $3,664 for space and equipment, and by $2,289 and $3,357 for indirect costs. Implants and consumables were derived from the actual hospital purchase price; accordingly, both methods produced equivalent results. Substantial cost differences exist between accounting methods. The focus of TDABC only on resources used directly by the patient contrasts with the allocation of all operating costs, including all indirect costs and unused capacity, with traditional accounting. We expect that the true costs of hip and knee replacement care cycles are likely somewhere between estimates derived from traditional accounting methods and TDABC. TDABC offers patient-level granular cost information that better serves in the redesign of care pathways and may lead to more strategic resource-allocation decisions to optimize

  7. A general approach to total repair cost limit replacement policies

    Directory of Open Access Journals (Sweden)

    F. Beichelt

    2014-01-01

    Full Text Available A common replacement policy for technical systems consists in replacing a system by a new one after its economic lifetime, i.e. at that moment when its long-run maintenance cost rate is minimal. However, the strict application of the economic lifetime does not take into account the individual deviations of maintenance cost rates of single systems from the average cost development. Hence, Beichet proposed the total repair cost limit replacement policy: the system is replaced by a new one as soon as its total repair cost reaches or exceeds a given level. He modelled the repair cost development by functions of the Wiener process with drift. Here the same policy is considered under the assumption that the one-dimensional probability distribution of the process describing the repair cost development is given. In the examples analysed, applying the total repair cost limit replacement policy instead of the economic life-time leads to cost savings of between 4% and 30%. Finally, it is illustrated how to include the reliability aspect into the policy.

  8. Projections of costs, financing, and additional resource requirements for low- and lower middle-income country immunization programs over the decade, 2011-2020.

    Science.gov (United States)

    Gandhi, Gian; Lydon, Patrick; Cornejo, Santiago; Brenzel, Logan; Wrobel, Sandra; Chang, Hugh

    2013-04-18

    The Decade of Vaccines Global Vaccine Action Plan has outlined a set of ambitious goals to broaden the impact and reach of immunization across the globe. A projections exercise has been undertaken to assess the costs, financing availability, and additional resource requirements to achieve these goals through the delivery of vaccines against 19 diseases across 94 low- and middle-income countries for the period 2011-2020. The exercise draws upon data from existing published and unpublished global forecasts, country immunization plans, and costing studies. A combination of an ingredients-based approach and use of approximations based on past spending has been used to generate vaccine and non-vaccine delivery costs for routine programs, as well as supplementary immunization activities (SIAs). Financing projections focused primarily on support from governments and the GAVI Alliance. Cost and financing projections are presented in constant 2010 US dollars (US$). Cumulative total costs for the decade are projected to be US$57.5 billion, with 85% for routine programs and the remaining 15% for SIAs. Delivery costs account for 54% of total cumulative costs, and vaccine costs make up the remainder. A conservative estimate of total financing for immunization programs is projected to be $34.3 billion over the decade, with country governments financing 65%. These projections imply a cumulative funding gap of $23.2 billion. About 57% of the total resources required to close the funding gap are needed just to maintain existing programs and scale up other currently available vaccines (i.e., before adding in the additional costs of vaccines still in development). Efforts to mobilize additional resources, manage program costs, and establish mutual accountability between countries and development partners will all be necessary to ensure the goals of the Decade of Vaccines are achieved. Establishing or building on existing mechanisms to more comprehensively track resources and

  9. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  10. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  11. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  12. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  13. Development of geological disposal system; localization of element cost data and cost evaluation on the HLW repository

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Sik; Kim, Kil Jung; Yang, Young Jin; Kim, Sung Chun [KOPEC, Taejeon (Korea)

    2002-03-01

    To estimate Total Life Cycle Cost (TSLCC) for Korea HLW Repository through localization of element cost data, we review and re-organize each basic element cost data for reference repository system, localize various element cost and finally estimate TSLCC considering economic parameters. As results of the study, TSLCC is estimated as 17,167,689 million won, which includes costs for site preparation, surface facilities, underground facilities and management/integration. Since HLW repository Project is an early stage of pre-conceptual design at present, the information of design and project information are not enough to perform cost estimate and cost localization for the Project. However, project cost structure is re-organized based on the local condition and Total System Life Cycle Cost is estimated using the previous cost data gathered from construction experience of the local nuclear power plant. Project results can be used as basic reference data to assume total construction cost for the local HLW repository and should be revised to more reliable cost data with incorporating detail project design information into the cost estimate in a future. 20 refs. (Author)

  14. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  15. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  16. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  17. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  18. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  19. Animal board invited review: Dairy cow lameness expenditures, losses and total cost.

    Science.gov (United States)

    Dolecheck, K; Bewley, J

    2018-03-20

    Lameness is one of the most costly dairy cow diseases, yet adoption of lameness prevention strategies remains low. Low lameness prevention adoption might be attributable to a lack of understanding regarding total lameness costs. In this review, we evaluated the contribution of different expenditures and losses to total lameness costs. Evaluated expenditures included labor for treatment, therapeutic supplies, lameness detection and lameness control and prevention. Evaluated losses included non-saleable milk, reduced milk production, reduced reproductive performance, increased animal death, increased animal culling, disease interrelationships, lameness recurrence and reduced animal welfare. The previous literature on total lameness cost estimates was also summarized. The reviewed studies indicated that previous estimates of total lameness costs are variable and inconsistent in the expenditures and losses they include. Many of the identified expenditure and loss categories require further research to accurately include in total lameness cost estimates. Future research should focus on identifying costs associated with specific lameness conditions, differing lameness severity levels, and differing stages of lactation at onset of lameness to provide better total lameness cost estimates that can be useful for decision making at both the herd and individual cow level.

  20. Association of Hospital Costs With Complications Following Total Gastrectomy for Gastric Adenocarcinoma.

    Science.gov (United States)

    Selby, Luke V; Gennarelli, Renee L; Schnorr, Geoffrey C; Solomon, Stephen B; Schattner, Mark A; Elkin, Elena B; Bach, Peter B; Strong, Vivian E

    2017-10-01

    Postoperative complications are associated with increased hospital costs following major surgery, but the mechanism by which they increase cost and the categories of care that drive this increase are poorly described. To describe the association of postoperative complications with hospital costs following total gastrectomy for gastric adenocarcinoma. This retrospective analysis of a prospectively collected gastric cancer surgery database at a single National Cancer Institute-designated comprehensive cancer center included all patients undergoing curative-intent total gastrectomy for gastric adenocarcinoma between January 2009 and December 2012 and was conducted in 2015 and 2016. Ninety-day normalized postoperative costs. Hospital accounting system costs were normalized to reflect Medicare reimbursement levels using the ratio of hospital costs to Medicare reimbursement and categorized into major cost categories. Differences between costs in Medicare proportional dollars (MP $) can be interpreted as the amount that would be reimbursed to an average hospital by Medicare if it paid differentially based on types and extent of postoperative complications. In total, 120 patients underwent curative-intent total gastrectomy for stage I through III gastric adenocarcinoma between 2009 and 2012. Of these, 79 patients (65.8%) were men, and the median (interquartile range) age was 64 (52-70) years. The 51 patients (42.5%) who underwent an uncomplicated total gastrectomy had a mean (SD) normalized cost of MP $12 330 (MP $2500), predominantly owing to the cost of surgical care (mean [SD] cost, MP $6830 [MP $1600]). The 34 patients (28.3%) who had a major complication had a mean (SD) normalized cost of MP $37 700 (MP $28 090). Surgical care was more expensive in these patients (mean [SD] cost, MP $8970 [MP $2750]) but was a smaller contributor to total cost (24%) owing to increased costs from room and board (mean [SD] cost, MP $11 940 [MP $8820]), consultations (mean [SD

  1. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  2. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  3. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  4. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  5. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  6. The total lifetime health cost savings of smoking cessation to society

    DEFF Research Database (Denmark)

    Rasmussen, Gitte Susanne; Prescott, Eva; Sørensen, Thorkild I A

    2005-01-01

    Smoking cessation has major immediate and long-term health benefits. However, ex-smokers' total lifetime health costs and continuing smokers' costs remain uncompared, and hence the economic savings of smoking cessation to society have not been determined.......Smoking cessation has major immediate and long-term health benefits. However, ex-smokers' total lifetime health costs and continuing smokers' costs remain uncompared, and hence the economic savings of smoking cessation to society have not been determined....

  7. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  8. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  9. Project feasibility and mine production costs

    Energy Technology Data Exchange (ETDEWEB)

    Longworth, C R

    1987-01-01

    The paper outlines the present investment environment existing in the Australian Coal Industry and places this in the context of the current world seaborne coal trade. Those factors which have the greatest influence on the viability of coal projects today, namely coal prices and quality, exchange rates, cash cost of production, capital and borrowing costs, infrastructure and government charges are dealt with briefly. The paper concludes by giving a schedule of those factors of a local character which can be changed to render projects more competitive and also presents some external factors beyond Australia's control which will, in part, influence the development of the industry in the next decade. 4 refs., 8 figs.

  10. The Cost-Effectiveness of Dual Mobility Implants for Primary Total Hip Arthroplasty: A Computer-Based Cost-Utility Model.

    Science.gov (United States)

    Barlow, Brian T; McLawhorn, Alexander S; Westrich, Geoffrey H

    2017-05-03

    Dislocation remains a clinically important problem following primary total hip arthroplasty, and it is a common reason for revision total hip arthroplasty. Dual mobility (DM) implants decrease the risk of dislocation but can be more expensive than conventional implants and have idiosyncratic failure mechanisms. The purpose of this study was to investigate the cost-effectiveness of DM implants compared with conventional bearings for primary total hip arthroplasty. Markov model analysis was conducted from the societal perspective with use of direct and indirect costs. Costs, expressed in 2013 U.S. dollars, were derived from the literature, the National Inpatient Sample, and the Centers for Medicare & Medicaid Services. Effectiveness was expressed in quality-adjusted life years (QALYs). The model was populated with health state utilities and state transition probabilities derived from previously published literature. The analysis was performed for a patient's lifetime, and costs and effectiveness were discounted at 3% annually. The principal outcome was the incremental cost-effectiveness ratio (ICER), with a willingness-to-pay threshold of $100,000/QALY. Sensitivity analyses were performed to explore relevant uncertainty. In the base case, DM total hip arthroplasty showed absolute dominance over conventional total hip arthroplasty, with lower accrued costs ($39,008 versus $40,031 U.S. dollars) and higher accrued utility (13.18 versus 13.13 QALYs) indicating cost-savings. DM total hip arthroplasty ceased being cost-saving when its implant costs exceeded those of conventional total hip arthroplasty by $1,023, and the cost-effectiveness threshold for DM implants was $5,287 greater than that for conventional implants. DM was not cost-effective when the annualized incremental probability of revision from any unforeseen failure mechanism or mechanisms exceeded 0.29%. The probability of intraprosthetic dislocation exerted the most influence on model results. This model

  11. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  12. (abstract) Science-Project Interaction in the Low-Cost Mission

    Science.gov (United States)

    Wall, Stephen D.

    1994-01-01

    Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

  13. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  14. Controlling costs without compromising quality: paying hospitals for total knee replacement.

    Science.gov (United States)

    Pine, Michael; Fry, Donald E; Jones, Barbara L; Meimban, Roger J; Pine, Gregory J

    2010-10-01

    Unit costs of health services are substantially higher in the United States than in any other developed country in the world, without a correspondingly healthier population. An alternative payment structure, especially for high volume, high cost episodes of care (eg, total knee replacement), is needed to reward high quality care and reduce costs. The National Inpatient Sample of administrative claims data was used to measure risk-adjusted mortality, postoperative length-of-stay, costs of routine care, adverse outcome rates, and excess costs of adverse outcomes for total knee replacements performed between 2002 and 2005. Empirically identified inefficient and ineffective hospitals were then removed to create a reference group of high-performance hospitals. Predictive models for outcomes and costs were recalibrated to the reference hospitals and used to compute risk-adjusted outcomes and costs for all hospitals. Per case predicted costs were computed and compared with observed costs. Of the 688 hospitals with acceptable data, 62 failed to meet effectiveness criteria and 210 were identified as inefficient. The remaining 416 high-performance hospitals had 13.4% fewer risk-adjusted adverse outcomes (4.56%-3.95%; P costs ($12,773-$11,512; P costs. A payment system based on the demonstrated performance of effective, efficient hospitals can produce sizable cost savings without jeopardizing quality. In this study, 96% of total excess hospital costs resulted from higher routine costs at inefficient hospitals, whereas only 4% was associated with ineffective care.

  15. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  16. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  17. Managing the total cost of risk exposures through risk mapping techniques

    International Nuclear Information System (INIS)

    Unione, A.J.; Rode, D.M.

    1998-01-01

    In a competitive power market, power producers are exposed to an increasingly broad spectrum of financial risks. The cumulative impact of these financial risks is known collectively as the Total of Cost of Risk. The concept of Total of Cost of Risk presents the business reality of a company's exposure to potentially devastating financial consequences in an integrated and useful way. In this way, a strategy of managing Total Cost of Risk in the most cost effective way can become a means of ensuring long term business health and security. This paper will examine the use of risk mapping as a tool for visually understanding Total Cost of Risk, thus creating an enhanced situational awareness and an integrated basis for risk management decision. The evaluation process, available through the use of risk maps allows the power producers to pro-actively implement prudent business decisions concerning the design, operation and maintenance of power plants. Risk mapping is thus a means for harmonizing operational objectives, such as improved plant reliability, with corporate strategies and goals in terms of an effective risk management program

  18. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  19. Divergent surface and total soil moisture projections under global warming

    Science.gov (United States)

    Berg, Alexis; Sheffield, Justin; Milly, Paul C.D.

    2017-01-01

    Land aridity has been projected to increase with global warming. Such projections are mostly based on off-line aridity and drought metrics applied to climate model outputs but also are supported by climate-model projections of decreased surface soil moisture. Here we comprehensively analyze soil moisture projections from the Coupled Model Intercomparison Project phase 5, including surface, total, and layer-by-layer soil moisture. We identify a robust vertical gradient of projected mean soil moisture changes, with more negative changes near the surface. Some regions of the northern middle to high latitudes exhibit negative annual surface changes but positive total changes. We interpret this behavior in the context of seasonal changes in the surface water budget. This vertical pattern implies that the extensive drying predicted by off-line drought metrics, while consistent with the projected decline in surface soil moisture, will tend to overestimate (negatively) changes in total soil water availability.

  20. [Total knee and hip prosthesis: variables associated with costs].

    Science.gov (United States)

    Herrera-Espiñeira, Carmen; Escobar, Antonio; Navarro-Espigares, José Luis; Castillo, Juan de Dios Lunadel; García-Pérez, Lidia; Godoy-Montijano, Amparo

    2013-01-01

    The elevated prevalence of osteoarthritis in Western countries, the high costs of hip and knee arthroplasty, and the wide variations in the clinical practice have generated considerable interest in comparing the associated costs before and after surgery. To determine the influence of a number of variables on the costs of total knee and hip arthroplasty surgery during the hospital stay and during the one-year post-discharge. A prospective multi-center study was performed in 15 hospitals from three Spanish regions. Relationships between the independent variables and the costs of hospital stay and postdischarge follow-up were analyzed by using multilevel models in which the "hospital" variable was used to group cases. Independent variables were: age, sex, body mass index, preoperative quality of life (SF-12, EQ-5 and Womac questionnaires), surgery (hip/knee), Charlson Index, general and local complications, number of beds and economic-institutional dependency of the hospital, the autonomous region to which it belongs, and the presence of a caregiver. The cost of hospital stay, excluding the cost of the prosthesis, was 4,734 Euros, and the post-discharge cost was 554 Euros. With regard to hospital stay costs, the variance among hospitals explained 44-46% of the total variance among the patients. With regard to the post-discharge costs, the variability among hospitals explained 7-9% of the variance among the patients. There is considerable potential for reducing the hospital stay costs of these patients, given that more than 44% of the observed variability was not determined by the clinical conditions of the patients but rather by the behavior of the hospitals.

  1. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  2. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  3. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  4. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  5. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    not allowed to take longer) and maximum total value of subcontracted work. The problem is modelled as a mixed binary linear program that minimizes project cost. It can be solved using universal solvers (e.g. LINGO, AIMMS, CPLEX, MATLAB and Optimization Toolbox, etc.). However, developing a dedicated decision-support tool would facilitate practical applications. To illustrate the idea of the model, the authors present a numerical example to find the optimal set of resources allocated to a project.

  6. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  7. Total cost of ownership: Getting past the 10% solution

    International Nuclear Information System (INIS)

    Anderson, R.F.

    1996-01-01

    As the refining industry strives to succeed in a more-competitive world, some fresh ideas are needed to counter the headlines of plant closings, layoffs, and corporate restructurings. Other industries facing the same pressures have discovered opportunities to reduce cost in a more human and effective manner by using some tools borrowed from the Total Quality process to enhance the procurement process. Experience suggests that the purchase cost is a small fraction of the actual cost of a commodity and is often dwarfed by hidden costs. Discovering and eliminating the hidden costs of variation, nonoptimal operations, and poorly aligned vendor relations is vital to economic survival. The purpose of this paper is to suggest some fresh approaches to vendor-customer relations that can dramatically reduce undesired costs

  8. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  9. Variation in the cost of care for primary total knee arthroplasties.

    Science.gov (United States)

    Haas, Derek A; Kaplan, Robert S

    2017-03-01

    The study examined the cost variation across 29 high-volume US hospitals and their affiliated orthopaedic surgeons for delivering a primary total knee arthroplasty without major complicating conditions. The hospitals had similar patient demographics, and more than 80% of them had statistically-similar Medicare risk-adjusted readmission and complication rates. Hospital and physician personnel costs were calculated using time-driven activity-based costing. Consumable supply costs, such as the prosthetic implant, were calculated using purchase prices, and postacute care costs were measured using either internal costs or external claims as reported by each hospital. Despite having similar patient demographics and readmission and complication rates, the average cost of care for total knee arthroplasty across the hospitals varied by a factor of about 2 to 1. Even after adjusting for differences in internal labor cost rates, the hospital at the 90th percentile of cost spent about twice as much as the one at the 10th percentile of cost. The large variation in costs among sites suggests major and multiple opportunities to transfer knowledge about process and productivity improvements that lower costs while simultaneously maintaining or improving outcomes.

  10. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  11. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  12. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  13. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  14. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  15. How do high cost-sharing policies for physician care affect total care costs among people with chronic disease?

    Science.gov (United States)

    Xin, Haichang; Harman, Jeffrey S; Yang, Zhou

    2014-01-01

    This study examines whether high cost-sharing in physician care is associated with a differential impact on total care costs by health status. Total care includes physician care, emergency room (ER) visits and inpatient care. Since high cost-sharing policies can reduce needed care as well as unneeded care use, it raises the concern whether these policies are a good strategy for controlling costs among chronically ill patients. This study used the 2007 Medical Expenditure Panel Survey data with a cross-sectional study design. Difference in difference (DID), instrumental variable technique, two-part model, and bootstrap technique were employed to analyze cost data. Chronically ill individuals' probability of reducing any overall care costs was significantly less than healthier individuals (beta = 2.18, p = 0.04), while the integrated DID estimator from split results indicated that going from low cost-sharing to high cost-sharing significantly reduced costs by $12,853.23 more for sick people than for healthy people (95% CI: -$17,582.86, -$8,123.60). This greater cost reduction in total care among sick people likely resulted from greater cost reduction in physician care, and may have come at the expense of jeopardizing health outcomes by depriving patients of needed care. Thus, these policies would be inappropriate in the short run, and unlikely in the long run to control health plans costs among chronically ill individuals. A generous benefit design with low cost-sharing policies in physician care or primary care is recommended for both health plans and chronically ill individuals, to save costs and protect these enrollees' health status.

  16. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  17. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  18. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  19. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  20. Strategies for reducing implant costs in the revision total knee arthroplasty episode of care.

    Science.gov (United States)

    Elbuluk, Ameer M; Old, Andrew B; Bosco, Joseph A; Schwarzkopf, Ran; Iorio, Richard

    2017-12-01

    Implant price has been identified as a significant contributing factor to high costs associated with revision total knee arthroplasty (rTKA). The goal of this study is to analyze the cost of implants used in rTKAs and to compare this pricing with 2 alternative pricing models. Using our institutional database, we identified 52 patients from January 1, 2014 to December 31, 2014. Average cost of components for each case was calculated and compared to the total hospital cost for that admission. Costs for an all-component revision were then compared to a proposed "direct to hospital" (DTH) standardized pricing model and a fixed price revision option. Potential savings were calculated from these figures. On average, 28% of the total hospital cost was spent on implants for rTKA. The average cost for revision of all components was $13,640 and ranged from $3000 to $28,000. On average, this represented 32.7% of the total hospital cost. Direct to hospital implant pricing could potentially save approximately $7000 per rTKA, and the fixed pricing model could provide a further $1000 reduction per rTKA-potentially saving $8000 per case on implants alone. Alternative implant pricing models could help lower the total cost of rTKA, which would allow hospitals to achieve significant cost containment.

  1. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  2. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  3. Determining the True Cost to Deliver Total Hip and Knee Arthroplasty Over the Full Cycle of Care: Preparing for Bundling and Reference-Based Pricing.

    Science.gov (United States)

    DiGioia, Anthony M; Greenhouse, Pamela K; Giarrusso, Michelle L; Kress, Justina M

    2016-01-01

    The Affordable Care Act accelerates health care providers' need to prepare for new care delivery platforms and payment models such as bundling and reference-based pricing (RBP). Thriving in this environment will be difficult without knowing the true cost of care delivery at the level of the clinical condition over the full cycle of care. We describe a project in which we identified true costs for both total hip and total knee arthroplasty. With the same tool, we identified cost drivers in each segment of care delivery and collected patient experience information. Combining cost and experience information with outcomes data we already collect allows us to drive costs down while protecting outcomes and experiences, and compete successfully in bundling and RBP programs. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  5. Total quality in spent fuel pool reracking

    International Nuclear Information System (INIS)

    Cranston, J.S.; Bradbury, R.B.; Cacciapouti, R.J.

    1993-01-01

    The nuclear utility environment is one of strict cost control under prescriptive regulations and increasing public scrutiny. This paper presents the results of A Total Quality approach, by a dedicated team, that addresses the need for increased on-site spent fuel storage in this environment. Innovations to spent fuel pool reracking, driven by utilities' specific technical needs and shrinking budgets, have resulted in both product improvements and lower prices. A Total Quality approach to the entire turnkey project is taken, thereby creating synergism and process efficiency in each of the major phases of the project: design and analysis, licensing, fabrication, installation and disposal. Specific technical advances and the proven quality of the team members minimizes risk to the utility and its shareholders and provides a complete, cost effective service. Proper evaluation of spent fuel storage methods and vendors requires a full understanding of currently available customer driven initiatives that reduce cost while improving quality. In all phases of a spent fuel reracking project, from new rack design and analysis through old rack disposal, the integration of diverse experts, at all levels and throughout all phases of a reracking project, better serves utility needs. This Total Quality environment in conjunction with many technical improvements results in a higher quality product at a lower cost

  6. Projected Lifetime Healthcare Costs Associated with HIV Infection

    DEFF Research Database (Denmark)

    Nakagawa, Fumiyo; Miners, Alec; Smith, Colette J

    2015-01-01

    computer simulation model to project the distribution of lifetime outcomes and costs of men-who-have-sex-with-men (MSM) infected with HIV in 2013 aged 30, over 10,000 simulations. We assumed a resource-rich setting with no loss to follow-up, and that standards and costs of healthcare management remain...

  7. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  8. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  9. Resource use and costs associated with opioid-induced constipation following total hip or total knee replacement surgery

    Directory of Open Access Journals (Sweden)

    Wittbrodt ET

    2018-05-01

    Full Text Available Eric T Wittbrodt,1 Tong J Gan,2 Catherine Datto,1 Charles McLeskey,1 Meenal Sinha3 1US Medical Affairs, AstraZeneca, Wilmington, DE, USA; 2Department of Anesthesiology, Stony Brook Medicine, Stony Brook, NY, USA; 3Premier Applied Sciences, Premier, Inc., Charlotte, NC, USA Purpose: Constipation is a well-known complication of surgery that can be exacerbated by opioid analgesics. This study evaluated resource utilization and costs associated with opioid-induced constipation (OIC. Patients and methods: This retrospective, observational, and propensity-matched cohort study utilized the Premier Healthcare Database. The study included adults ≥18 years of age undergoing total hip or total knee replacement as inpatients who received an opioid analgesic and were discharged between January 1, 2012, and June 30, 2015. Diagnosis codes identified patients with OIC who were then matched 1:1 to patients without OIC. Generalized linear and logistic regression models were used to compare inpatient resource utilization, total hospital costs, inpatient mortality, and 30-day all-cause readmissions and emergency department visits. Results: Of 788,448 eligible patients, 40,891 (5.2% had OIC. Covariates were well balanced between matched patients with and without OIC (n=40,890 each. In adjusted analyses, patients with OIC had longer hospital lengths of stay (3.6 versus 3.3 days; p<0.001, higher total hospital costs (US$17,479 versus US$16,265; p<0.001, greater risk of intensive care unit admission (odds ratio [OR]=1.12, 95% CI: 1.01–1.24, and increased likelihood of 30-day hospital readmissions (OR=1.16, 95% CI: 1.11–1.22 and emergency department visits (OR=1.38, 95% CI: 1.07–1.79 than patients without OIC. No statistically significant difference was found with inpatient mortality (OR=0.89, 95% CI: 0.59–1.35. Conclusion: OIC was associated with greater resource utilization and hospital costs for patients undergoing primarily elective total hip or total knee

  10. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  11. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  12. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  13. Total life-cycle cost analysis of conventional and alternative fueled vehicles

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1993-01-01

    Total Life-Cycle Cost (TLCC) Analysis can indicate whether paying higher capital costs for advanced technology with low operating and/or environmental costs is advantageous over paying lower capital costs for conventional technology with higher operating and/or environmental costs. While minimizing total life-cycle cost is an important consideration, the consumer often identifies non-cost-related benefits or drawbacks that make more expensive options appear more attractive. The consumer is also likely to heavily weigh initial capital costs while giving limited consideration to operating and/or societal costs, whereas policy-makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. This paper summarizes a TLCC model which was developed to facilitate consideration of the various factors involved in both individual and societal policy decision making. The model was developed as part of a US Department of Energy Contract and has been revised to reflect changes necessary to make the model more realistic. The model considers capital, operating, salvage, and environmental costs for cars, vans, and buses using conventional and alternative fuels. The model has been developed to operate on an IBM or compatible personal computer platform using the commercial spreadsheet program MicroSoft Excell reg-sign Version 4 for Windows reg-sign and can be easily kept current because its modular structure allows straightforward access to embedded data sets for review and update

  14. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  15. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  16. Projected Costs of U.S. Nuclear Forces, 2017 to 2026

    Science.gov (United States)

    2017-02-01

    amounts at roughly the same rates that costs for similar programs have grown in the past. Nuclear forces account for roughly 6 percent of the total 10...nuclear forces, some published estimates of the total costs of nuclear weapons account for the costs of several related activities. Examples include...based its estimate on historical costs of analogous programs. b. This category includes nuclear-related research and operations support activities by

  17. Sharing the cost of risky projects

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moulin, Hervé

    2018-01-01

    Users share the cost of unreliable non-rival projects (items). For instance, industry partners pay today for R&D that may or may not deliver a cure to some viruses, agents pay for the edges of a network that will cover their connectivity needs, but the edges may fail, etc. Each user has a binary...

  18. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  19. Intensive care unit drug costs in the context of total hospital drug expenditures with suggestions for targeted cost containment efforts.

    Science.gov (United States)

    Altawalbeh, Shoroq M; Saul, Melissa I; Seybert, Amy L; Thorpe, Joshua M; Kane-Gill, Sandra L

    2018-04-01

    To assess costs of intensive care unit (ICU) related pharmacotherapy relative to hospital drug expenditures, and to identify potential targets for cost-effectiveness investigations. We offer the unique advantage of comparing ICU drug costs with previously published data a decade earlier to describe changes over time. Financial transactions for all ICU patients during fiscal years (FY) 2009-2012 were retrieved from the hospital's data repository. ICU drug costs were evaluated for each FY. ICU departments' charges were also retrieved and calculated as percentages of total ICU charges. Albumin, prismasate (dialysate), voriconazole, factor VII and alteplase denoted the highest percentages of ICU drug costs. ICU drug costs contributed to an average of 31% (SD 1.0%) of the hospital's total drug costs. ICU drug costs per patient day increased by 5.8% yearly versus 7.8% yearly for non-ICU drugs. This rate was higher for ICU drugs costs at 12% a decade previous. Pharmacy charges contributed to 17.7% of the total ICU charges. Growth rates of costs per year have declined but still drug expenditures in the ICU are consistently a significant driver in this resource intensive environment with a high impact on hospital drug expenditures. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  1. Cost per case or total cost? The potential of prevention of hand injuries in young children – Retrospective and prospective studies

    Directory of Open Access Journals (Sweden)

    Carlsson Katarina

    2008-07-01

    Full Text Available Abstract Background Health-care costs for hand and forearm injuries in young children are poorly documented. We examined costs in 533 children injured years 1996–2003. Methods Health-care costs and costs for lost productivity were retrospectively calculated in children from three catchment areas in Sweden. Seven case categories corresponding to alternative prevention strategies were constructed. Results Over time, diminishing number of ward days reduced the health-care cost per case. Among children, the cost of lost productivity due to parental leave was 14 percent of total cost. Fingertip injuries had low median costs but high total costs due to their frequency. Complex injuries by machine or rifle had high costs per case, and despite a low number of cases, total cost was high. Type of injury, surgery and physiotherapy sessions were associated with variations in health-care cost. Low age and ethnic background had a significant effect on number of ward days. Conclusion The costs per hand injury for children were lower compared to adults due to both lower health-care costs and to the fact that parents had comparatively short periods of absence from work. Frequent simple fingertip injuries and rare complex injuries induce high costs for society. Such costs should be related to costs for prevention of these injuries.

  2. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  3. Retail clinic utilization associated with lower total cost of care.

    Science.gov (United States)

    Sussman, Andrew; Dunham, Lisette; Snower, Kristen; Hu, Min; Matlin, Olga S; Shrank, William H; Choudhry, Niteesh K; Brennan, Troyen

    2013-04-01

    To better understand the impact of retail clinic use on a patient's annual total cost of care. A propensity score matched-pair, cohort design was used to analyze healthcare spending patterns among CVS Caremark employees in the year following a visit to a MinuteClinic, the retail clinics inside CVS pharmacies. De-identified medical and pharmacy claims for CVS Caremark employees and their dependents who received care at a retail clinic between June 1, 2009, and May 31, 2010, were matched to those of subjects who received care elsewhere. High-dimensional propensity score and greedy matching techniques were used to create a 1-to-1 matched cohort that was analyzed using generalized linear regression models. Individuals using a retail clinic had a lower total cost of care (-$262; 95% confidence interval, -$510 to -$31; P = .025) in the year following their clinic visit than individuals who received care in other settings. This savings was primarily due to lower medical expenses at physicians' offices ($77 savings, P = .008) and hospital inpatient care ($121 savings, P = .049). The 6022 retail clinic users also had 142 (12%) fewer emergency department visits (P = .01), though this was not related to significant cost savings. This study found that retail clinic use was associated with lower overall total cost of care compared with that at alternative sites. Savings may extend beyond the retail clinic visit itself to other types of medical utilization.

  4. Determining the total cost of reverse supply chain operations for original equipment manufacturers

    DEFF Research Database (Denmark)

    Larsen, Samuel Brüning; Jacobsen, Peter

    2014-01-01

    When original equipment manufacturers (OEM) examine whether or not to invest in a reverse supply chain (RSC), managers need insight into not only the cost savings and new revenue streams the RSC enables, but also the total cost of the RSC itself. Using case study research the study examines what...... cost parameters constitute the total cost (TC) of the RSC. The specific RSC that the study seeks the TC for consists of 1) end-product refurbishing, 2) component refurbishing, and 3) sales of used materials back to original suppliers or independent recyclers for materials recycling....

  5. Patterns of pharmacotherapy and health care utilization and costs prior to total hip or total knee replacement in patients with osteoarthritis.

    Science.gov (United States)

    Berger, Ariel; Bozic, Kevin; Stacey, Brett; Edelsberg, John; Sadosky, Alesia; Oster, Gerry

    2011-08-01

    To examine patterns of pharmacotherapy and health care utilization and costs prior to total knee replacement (TKR) or total hip replacement (THR) in patients with osteoarthritis (OA). Using a large US health insurance claims database, we identified all patients with OA who were ages ≥40 years and had undergone TKR or THR between January 1, 2006 and December 31, 2007. Patients with care utilization and costs over the 2-year period preceding surgery. A total of 16,527 patients met all study entry criteria. Their mean ± SD age was 56.6 ± 6.1 years, and 56% of them were women. In the 2 years preceding surgery, 55% of patients received prescription nonsteroidal antiinflammatory drugs, 58% received opioids, and 50% received injections of corticosteroids. The numbers of patients receiving these drugs increased steadily during the presurgery period. The mean ± SD total health care costs in the 2 years preceding surgery were $19,466 ± 29,869, of which outpatient care, inpatient care, and pharmacotherapy represented 45%, 20%, and 20%, respectively. Costs increased from $2,094 in the eighth calendar quarter prior to surgery to $3,100 in the final quarter. Patients with OA who undergo THR or TKR have relatively high levels of use of pain-related pharmacotherapy and high total health care costs in the 2-year period preceding surgery. Levels of utilization and cost increase as the date of surgery approaches. Copyright © 2011 by the American College of Rheumatology.

  6. A decision-making framework for total ownership cost management of complex systems: A Delphi study

    Science.gov (United States)

    King, Russel J.

    This qualitative study, using a modified Delphi method, was conducted to develop a decision-making framework for the total ownership cost management of complex systems in the aerospace industry. The primary focus of total ownership cost is to look beyond the purchase price when evaluating complex system life cycle alternatives. A thorough literature review and the opinions of a group of qualified experts resulted in a compilation of total ownership cost best practices, cost drivers, key performance factors, applicable assessment methods, practitioner credentials and potential barriers to effective implementation. The expert panel provided responses to the study questions using a 5-point Likert-type scale. Data were analyzed and provided to the panel members for review and discussion with the intent to achieve group consensus. As a result of the study, the experts agreed that a total ownership cost analysis should (a) be as simple as possible using historical data; (b) establish cost targets, metrics, and penalties early in the program; (c) monitor the targets throughout the product lifecycle and revise them as applicable historical data becomes available; and (d) directly link total ownership cost elements with other success factors during program development. The resultant study framework provides the business leader with incentives and methods to develop and implement strategies for controlling and reducing total ownership cost over the entire product life cycle when balancing cost, schedule, and performance decisions.

  7. The true costs of participatory sanitation: Evidence from community-led total sanitation studies in Ghana and Ethiopia.

    Science.gov (United States)

    Crocker, Jonny; Saywell, Darren; Shields, Katherine F; Kolsky, Pete; Bartram, Jamie

    2017-12-01

    Evidence on sanitation and hygiene program costs is used for many purposes. The few studies that report costs use top-down costing methods that are inaccurate and inappropriate. Community-led total sanitation (CLTS) is a participatory behavior-change approach that presents difficulties for cost analysis. We used implementation tracking and bottom-up, activity-based costing to assess the process, program costs, and local investments for four CLTS interventions in Ghana and Ethiopia. Data collection included implementation checklists, surveys, and financial records review. Financial costs and value-of-time spent on CLTS by different actors were assessed. Results are disaggregated by intervention, cost category, actor, geographic area, and project month. The average household size was 4.0 people in Ghana, and 5.8 people in Ethiopia. The program cost of CLTS was $30.34-$81.56 per household targeted in Ghana, and $14.15-$19.21 in Ethiopia. Most program costs were from training for three of four interventions. Local investments ranged from $7.93-$22.36 per household targeted in Ghana, and $2.35-$3.41 in Ethiopia. This is the first study to present comprehensive, disaggregated costs of a sanitation and hygiene behavior-change intervention. The findings can be used to inform policy and finance decisions, plan program scale-up, perform cost-effectiveness and benefit studies, and compare different interventions. The costing method is applicable to other public health behavior-change programs. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  8. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  9. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  10. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  11. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  12. Pre-fracture individual characteristics associated with high total health care costs after hip fracture.

    Science.gov (United States)

    Schousboe, J T; Paudel, M L; Taylor, B C; Kats, A M; Virnig, B A; Dowd, B E; Langsetmo, L; Ensrud, K E

    2017-03-01

    Older women with pre-fracture slow walk speed, high body mass index, and/or a high level of multimorbidity have significantly higher health care costs after hip fracture compared to those without those characteristics. Studies to investigate if targeted health care interventions for these individuals can reduce hip fracture costs are warranted. The aim of this study is to estimate the associations of individual pre-fracture characteristics with total health care costs after hip fracture, using Study of Osteoporotic Fractures (SOF) cohort data linked to Medicare claims. Our study population was 738 women age 70 and older enrolled in Medicare Fee for Service (FFS) who experienced an incident hip fracture between January 1, 1992 and December 31, 2009. We assessed pre-fracture individual characteristics at SOF study visits and estimated costs of hospitalizations, skilled nursing facility and inpatient rehabilitation stays, home health care visits, and outpatient utilization from Medicare FFS claims. We used generalized linear models to estimate the associations of predictor variables with total health care costs (2010 US dollars) after hip fracture. Median total health care costs for 1 year after hip fracture were $35,536 (inter-quartile range $24,830 to $50,903). Multivariable-adjusted total health care costs for 1 year after hip fracture were 14 % higher ($5256, 95 % CI $156 to $10,356) in those with walk speed total health care costs after hip fracture in older women. Studies to investigate if targeted health care interventions for these individuals can reduce the costs of hip fractures are warranted.

  13. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  14. Hybrid Cloud Computing Architecture Optimization by Total Cost of Ownership Criterion

    Directory of Open Access Journals (Sweden)

    Elena Valeryevna Makarenko

    2014-12-01

    Full Text Available Achieving the goals of information security is a key factor in the decision to outsource information technology and, in particular, to decide on the migration of organizational data, applications, and other resources to the infrastructure, based on cloud computing. And the key issue in the selection of optimal architecture and the subsequent migration of business applications and data to the cloud organization information environment is the question of the total cost of ownership of IT infrastructure. This paper focuses on solving the problem of minimizing the total cost of ownership cloud.

  15. 13 CFR 120.882 - Eligible Project costs for 504 loans.

    Science.gov (United States)

    2010-01-01

    ... financing including points, fees and interest. (e) If the project involves expansion of a small business... expansion of a small business concern” includes any project that involves the acquisition, construction or... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Eligible Project costs for 504...

  16. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones-Albertus, Rebecca [U.S. Department of Energy

    2018-04-02

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as well as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.

  17. Projected Costs of Informal Caregiving for Cardiovascular Disease: 2015 to 2035: A Policy Statement From the American Heart Association.

    Science.gov (United States)

    Dunbar, Sandra B; Khavjou, Olga A; Bakas, Tamilyn; Hunt, Gail; Kirch, Rebecca A; Leib, Alyssa R; Morrison, R Sean; Poehler, Diana C; Roger, Veronique L; Whitsel, Laurie P

    2018-05-08

    In a recent report, the American Heart Association estimated that medical costs and productivity losses of cardiovascular disease (CVD) are expected to grow from $555 billion in 2015 to $1.1 trillion in 2035. Although the burden is significant, the estimate does not include the costs of family, informal, or unpaid caregiving provided to patients with CVD. In this analysis, we estimated projections of costs of informal caregiving attributable to CVD for 2015 to 2035. We used data from the 2014 Health and Retirement Survey to estimate hours of informal caregiving for individuals with CVD by age/sex/race using a zero-inflated binomial model and controlling for sociodemographic factors and health conditions. Costs of informal caregiving were estimated separately for hypertension, coronary heart disease, heart failure, stroke, and other heart disease. We analyzed data from a nationally representative sample of 16 731 noninstitutionalized adults ≥54 years of age. The value of caregiving hours was monetized by the use of home health aide workers' wages. The per-person costs were multiplied by census population counts to estimate nation-level costs and to be consistent with other American Heart Association analyses of burden of CVD, and the costs were projected from 2015 through 2035, assuming that within each age/sex/racial group, CVD prevalence and caregiving hours remain constant. The costs of informal caregiving for patients with CVD were estimated to be $61 billion in 2015 and are projected to increase to $128 billion in 2035. Costs of informal caregiving of patients with stroke constitute more than half of the total costs of CVD informal caregiving ($31 billion in 2015 and $66 billion in 2035). By age, costs are the highest among those 65 to 79 years of age in 2015 but are expected to be surpassed by costs among those ≥80 years of age by 2035. Costs of informal caregiving for patients with CVD represent an additional 11% of medical and productivity costs

  18. Project-Based Emissions Trading. The Impact of Institutional Arrangements on Cost-Effectiveness

    International Nuclear Information System (INIS)

    Woerdman, E.; Van der Gaast, W.

    2001-01-01

    In this paper we demonstrate that the institutional arrangement (or: design) of Joint Implementation (JI) and the Clean Development Mechanism (CDM) has a decisive impact on their cost-effectiveness. We illustrate our arguments by statistically analyzing the costs from 94 Activities Implemented Jointly (AIJ) pilot phase projects as well as by adjusting these data on the basis of simple mathematical formulas. These calculations explicitly take into account the institutional differences between JI (sinks, no banking) and the CDM (banking, no sinks) under the Kyoto Protocol and also show the possible effects on credit costs of alternative design options. However, our numerical illustrations should be viewed with caution, because AIJ is only to a limited extent representative of potential future JI and CDM projects and because credit costs are not credit prices. Some of the main figures found in this study are: an average cost figure per unit of emission reduction for AIJ projects of 46 dollar per ton of carbon dioxide equivalent ($/Mg CO 2 -eq), an average potential JI credit cost figure which is lowered to 37 $/Mg CO 2 -eq by introducing banking and an average of 6 $/Mg CO 2 -eq per credit for potential low-cost CDM projects which includes sinks. However, at CoP6 in November 2000 in The Hague (The Netherlands), the Parties to the Framework Convention on Climate Change (FCCC) did not (yet) reach consensus on the institutional details of the project-based mechanisms, such as the possible arrangement of early JI action or the inclusion of sinks under the CDM. 55 refs

  19. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Berkeley; Wei, Max; Lipman, Timothy; Mayyas, Ahmad; Chien, Joshua; Chan, Shuk Han; Gosselin, David; Breunig, Hanna; Stadler, Michael; McKone, Thomas; Beattie, Paul; Chong, Patricia; Colella, Whitney; James, Brian

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kW level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.

  20. Minimizing total costs of forest roads with computer-aided design ...

    Indian Academy of Sciences (India)

    imum total road costs, while conforming to design specifications, environmental ..... quality, and enhancing fish and wildlife habitat, an appropriate design ..... Soil, Water and Timber Management: Forest Engineering Solutions in Response to.

  1. Comparative cost analyses: total flow vs other power conversion systems for the Salton Sea Geothermal Resource

    Energy Technology Data Exchange (ETDEWEB)

    Wright, G.W.

    1978-09-18

    Cost studies were done for Total Flow, double flash, and multistage flash binary systems for electric Energy production from the Salton Sea Geothermal Resource. The purpose was to provide the Department of energy's Division of Geothermal Energy with information by which to judge whether to continue development of the Total Flow system. Results indicate that the Total Flow and double flash systems have capital costs of $1,135 and $1,026 /kW with energy costs of 40.9 and 39.7 mills/kW h respectively. The Total Flow and double flash systems are not distinguishable on a cost basis alone; the multistage flash binary system, with capital cost of $1,343 /kW and energy cost of 46.9 mills/kW h, is significantly more expensive. If oil savings are considered in the total analysis, the Total Flow system could save 30% more oil than the double flash system, $3.5 billion at 1978 oil prices.

  2. Hidden costs of low-cost screening mammography

    International Nuclear Information System (INIS)

    Cyrlak, D.

    1987-01-01

    Twenty-two hundred women in Orange County, California, took part in a low-cost mammography screening project sponsored by the American Cancer Society and the KCBS-TV. Patients were followed up by telephone and questioned about actual costs incurred as a result of screening mammography, including costs of repeated and follow-up mammograms, US examinations and surgical consultations. The total number of biopsies, cancers found, and the costs involved were investigated. The authors' results suggest that particularly in centers with a high positive call rate, the cost of screening mammograms accounts for only a small proportion of the medical costs

  3. Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Ramsden, T.

    2013-04-01

    This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

  4. Field activity cost estimates for the first 3 years of the World Bank Loan Project for schistosomiasis control in China.

    Science.gov (United States)

    Guo, J; Booth, M; Jenkins, J; Wang, H; Tanner, M

    1998-12-01

    The World Bank Loan Project for schistosomiasis in China commenced field activities in 1992. In this paper, we describe disease control strategies for levels of different endemicity, and estimate unit costs and total expenditure of screening, treatment (cattle and humans) and snail control for 8 provinces where Schistosoma japonicum infection is endemic. Overall, we estimate that more than 21 million US dollars were spent on field activities during the first three years of the project. Mollusciciding (43% of the total expenditure) and screening (28% of the total) are estimated to have the most expensive field activities. However, despite the expense of screening, a simple model predicts that selective chemotherapy could have been cheaper than mass chemotherapy in areas where infection prevalence was higher than 15%, which was the threshold for mass chemotherapy intervention. It is concluded that considerable cost savings could be made in the future by narrowing the scope of snail control activities, redefining the threshold infection prevalence for mass chemotherapy, defining smaller administrative units, and developing rapid assessment tools.

  5. [Preliminary analysis of total cost and life quality for elder patients with femoral neck fracture].

    Science.gov (United States)

    Liu, Haonan; He, Liang; Zhang, Guilin; Gong, Xiaofeng; Li, Ning

    2015-09-01

    To analyze the total cost and life quality of the femoral neck fracture patients who received different surgery and supplement comprehensive data of osteoporotic fracture. One hundred and five patients above 60-year old who were diagnosed femoral neck fracture and received operation in Department of Orthopedics & Traumatology, Beijing Jishuitan Hospital were admitted into our study from August 2013 to December. According to the type of surgery there were 52 and 53 cases in internal fixation (IF) group and hemiarthroplasty (HA) group respectively. At first we collected the medical expense of the patients before and during hospitalization. And then the 1-year medical and non-medical expenses were collected by the cost diary ever 3 months after discharge. At the last follow-up we evaluated the life quality by the EuroQol-5 Dimensions (EQ-5D) and calculated the total cost. Outcome All the patients completed the operation successfully. No nonunion or delayed union cases in IF group, and no cases received revision surgery in both groups. The total average cost was 59 584.9 yuan including 79.1% medical cost and 20.9% non-medical cost. The primary treatment cost accounts for 84.1% of the medical cost. The cost for home care accounts for 90.7% of the non-medical care. The total and medical cost of IF group just account for 40.3% and 38.5% of the HA group and the non-medical showed no significant difference between the 2 groups (P>0.05). In addition the data of life quality and walking capability also showed no significant difference. The main cost for the femoral neck fracture is medical expense in 1-year follow-up. Both surgeries can provide satisfactory outcome, however IF may be more cost-effective compared to the HA because of the less total cost.

  6. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  7. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-03-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $210.6 million, total reported cost savings were $215.1 million, and total guaranteed cost savings were $204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

  8. Reduction of Total Ownership Costs (R-TOC) Best Practices Guide

    National Research Council Canada - National Science Library

    Reed, Danny

    2003-01-01

    The purpose of the Reduction of Total Ownership Costs (R-TOC) program is to achieve readiness improvements in weapon systems by improving the reliability of the systems or the efficiency of the processes used to support...

  9. evaluation of total annual costs of heat exchanger networks using

    African Journals Online (AJOL)

    user

    after solving the first problem using RPA based heat integration gave a minimum total annual cost (TAC) of $237, ... mathematical programming and non-RPA based Hint software. ... The concept of pinch analysis evolved over the years.

  10. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  11. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  12. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  13. Clinical benefit and cost effectiveness of total knee arthroplasty in the older patient

    Directory of Open Access Journals (Sweden)

    Krummenauer F

    2009-02-01

    Full Text Available Abstract Purpose Total knee arthroplasty (TKA is an effective, but also cost-intensive health care procedure for the elderly. Furthermore, bearing demographic changes in Western Europe in mind, TKA-associated financial investment for health care insurers will increase notably and thereby catalyze discussions on ressource allocation to Orthopedic surgery. To derive a quantitative rationale for such discussions within Western Europe's health care systems, a prospective assessment of both the benefit of TKA from a patient's perspective as well as its cost effectiveness from a health care insurer's perspective was implemented. Methods A prospective cost effectiveness trial recruited a total of 65 patients (60% females, who underwent TKA in 2006; median age of patients was 66 years (interquartile range 61 - 74 years. Before and three months after surgery patients were interviewed by means of the EuroQol-5D and the WOMAC questionnaires to assess their individual benefit due to TKA and the subsequent inpatient rehabilitation. Both questionnaires' benefit estimates were transformed into the number of gained quality adjusted life years [QALYs]. Total direct cost estimates for the overall care were based on German DRG and rehabilitation cost rates [€]. The primary clinical endpoint of the investigation was the individual number of QALYs gained by TKA based on the WOMAC interview; the primary health economic endpoint was the marginal cost effectiveness ratio (MCER relating the costs to the associated gain in quality of life [€/QALY]. Results Total direct costs for the overall procedure were estimed 9549 € in median. The WOMAC based interview revealed an overall gain of 4.59 QALYs (interquartile range 2.39 - 6.21 QALYs, resulting in marginal costs of 1795 €/QALY (1488 - 3288 €/QALY. The corresponding EuroQol based estimates were 2.93 QALYs (1.75 - 5.59 QALYs and 3063 €/QALY (1613 - 5291 €/QALY. Logistic regression modelling identified the

  14. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  15. Using value-based total cost of ownership (TCO) measures to inform subsystem trade-offs

    Science.gov (United States)

    Radziwill, Nicole M.; DuPlain, Ronald F.

    2010-07-01

    Total Cost of Ownership (TCO) is a metric from management accounting that helps expose both the direct and indirect costs of a business decision. However, TCO can sometimes be too simplistic for "make vs. buy" decisions (or even choosing between competing design alternatives) when value and extensibility are more critical than total cost. A three-dimensional value-based TCO, which was developed to clarify product decisions for an observatory prior to Final Design Review (FDR), will be presented in this session. This value-based approach incorporates priority of requirements, satisfiability of requirements, and cost, and can be easily applied in any environment.

  16. Cost-effectiveness of positive contrast and nuclear arthrography in patients who underwent total hip arthroplasty

    International Nuclear Information System (INIS)

    Swan, J.S.; Braunstein, E.M.; Capello, W.; Wellman, H.

    1989-01-01

    The authors have compared the cost effectiveness of contrast arthrography (CA) and nuclear arthrography (NA), in which In-111 chloride is injected with the contrast material, of total hip arthroplasties. Their series included 48 cases of surgically proved loose femoral components. The cost per true-positive result was obtained by taking the total cost of the examinations in surgically proved cases and dividing by the number of true-position cases. The cost of CA was $297 and the cost of NA was $335. For CA, the cost per true positive was $1,018, and for the NA the cost per true positive was $946. In spite of higher initial cost, NA is more cost effective than CA on a cost per true-positive case basis. NA is cost effective in evaluating hip arthroplasties in which there is suspicion of a loose femoral component

  17. Long-term care cost drivers and expenditure projection to 2036 in Hong Kong

    Directory of Open Access Journals (Sweden)

    Chan Wai

    2009-09-01

    Full Text Available Abstract Background Hong Kong's rapidly ageing population, characterised by one of the longest life expectancies and the lowest fertility rate in the world, is likely to drive long-term care (LTC expenditure higher. This study aims to identify key cost drivers and derive quantitative estimates of Hong Kong's LTC expenditure to 2036. Methods We parameterised a macro actuarial simulation with data from official demographic projections, Thematic Household Survey 2004, Hong Kong's Domestic Health Accounts and other routine data from relevant government departments, Hospital Authority and other LTC service providers. Base case results were tested against a wide range of sensitivity assumptions. Results Total projected LTC expenditure as a proportion of GDP reflected secular trends in the elderly dependency ratio, showing a shallow dip between 2004 and 2011, but thereafter yielding a monotonic rise to reach 3.0% by 2036. Demographic changes would have a larger impact than changes in unit costs on overall spending. Different sensitivity scenarios resulted in a wide range of spending estimates from 2.2% to 4.9% of GDP. The availability of informal care and the setting of formal care as well as associated unit costs were important drivers of expenditure. Conclusion The "demographic window" between the present and 2011 is critical in developing policies to cope with the anticipated burgeoning LTC burden, in concert with the related issues of health care financing and retirement planning.

  18. En differentieret tilgang til total cost of ownership (TCO)

    DEFF Research Database (Denmark)

    Zachariassen, Frederik

    2010-01-01

    Økonomistyring er en nødvendig brik i forsøget på at kunne styre dele af eller hele forsyningskæden, og til dette bruges diverse økonomistyringsværktøjer. Denne artikel omhandler økonomistyringsværktøjet 'total cost of ownership', og hvordan dette kan bruges til at forbedre samarbejdet med...

  19. The Relationship between Cost Leadership Strategy, Total Quality Management Applications and Financial Performance

    Directory of Open Access Journals (Sweden)

    Ali KURT

    2016-03-01

    Full Text Available Firms need to implement some competition strategies and total quality management applications to overcome the fierce competition among others. The purpose of this study is to show the relationship between cost leadership strategy, total quality management applications and firms’ financial performance with literature review and empirical analysis. 449 questionnaires were conducted to the managers of 142 big firms. The data gathered was assessed with AMOS. As a result, the relationship between cost leadership strategy, total quality management applications and firms’ financial performance has been gathered. In addition, the relationship between TQM applications and financial performance has also been gathered.

  20. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  1. Leveraging Real-World Evidence in Disease-Management Decision-Making with a Total Cost of Care Estimator.

    Science.gov (United States)

    Nguyen, Thanh-Nghia; Trocio, Jeffrey; Kowal, Stacey; Ferrufino, Cheryl P; Munakata, Julie; South, Dell

    2016-12-01

    Health management is becoming increasingly complex, given a range of care options and the need to balance costs and quality. The ability to measure and understand drivers of costs is critical for healthcare organizations to effectively manage their patient populations. Healthcare decision makers can leverage real-world evidence to explore the value of disease-management interventions in shifting total cost trends. To develop a real-world, evidence-based estimator that examines the impact of disease-management interventions on the total cost of care (TCoC) for a patient population with nonvalvular atrial fibrillation (NVAF). Data were collected from a patient-level real-world evidence data set that uses the IMS PharMetrics Health Plan Claims Database. Pharmacy and medical claims for patients meeting the inclusion or exclusion criteria were combined in longitudinal cohorts with a 180-day preindex and 360-day follow-up period. Descriptive statistics, such as mean and median patient costs and event rates, were derived from a real-world evidence analysis and were used to populate the base-case estimates within the TCoC estimator, an exploratory economic model that was designed to estimate the potential impact of several disease-management activities on the TCoC for a patient population with NVAF. Using Microsoft Excel, the estimator is designed to compare current direct costs of medical care to projected costs by varying assumptions on the impact of disease-management activities and applying the associated changes in cost trends to the affected populations. Disease-management levers are derived from literature-based concepts affecting costs along the NVAF disease continuum. The use of the estimator supports analyses across 4 US geographic regions, age, cost types, and care settings during 1 year. All patients included in the study were continuously enrolled in their health plan (within the IMS PharMetrics Health Plan Claims Database) between July 1, 2010, and June 30

  2. Chambolle's Projection Algorithm for Total Variation Denoising

    Directory of Open Access Journals (Sweden)

    Joan Duran

    2013-12-01

    Full Text Available Denoising is the problem of removing the inherent noise from an image. The standard noise model is additive white Gaussian noise, where the observed image f is related to the underlying true image u by the degradation model f=u+n, and n is supposed to be at each pixel independently and identically distributed as a zero-mean Gaussian random variable. Since this is an ill-posed problem, Rudin, Osher and Fatemi introduced the total variation as a regularizing term. It has proved to be quite efficient for regularizing images without smoothing the boundaries of the objects. This paper focuses on the simple description of the theory and on the implementation of Chambolle's projection algorithm for minimizing the total variation of a grayscale image. Furthermore, we adapt the algorithm to the vectorial total variation for color images. The implementation is described in detail and its parameters are analyzed and varied to come up with a reliable implementation.

  3. Total hip arthroplasty revision due to infection: a cost analysis approach.

    Science.gov (United States)

    Klouche, S; Sariali, E; Mamoudy, P

    2010-04-01

    The treatment of total hip arthroplasty (THA) infections is long and costly. However,the number of studies in the literature analysing the real cost of THA revision in relation to their etiology, including infection, is limited. The aim of this retrospective study was to determine the cost of revision of infected THA and to compare these costs to those of primary THA and revision of non-infected THA. We performed a retrospective cost analysis for the year 2006 using an identical analytic accounting system in each hospital department (according to internal criteria) based on allotment of direct costs and receipts for each department. From January to December 2006, 424 primary THA, 57 non-infected THA revisions and 40 THA revisions due to infection were performed. The different cost areas of the patient's treatment were identified.This included preoperative medical work-up, medicosurgical management during hospital stay,a second stay in an orthopedic rehabilitation hospital (ORH) and post-hospitalisation antibiotic therapy after revision due to infection, as well as home-based hospitalisation (HH) costs, if this was the selected alternative option. We used the national health insurance fee schedule found in the "Common classification of medical procedures" and the "General nomenclature of professional procedures" applicable in France since September 1, 2005. Hospital costs included direct costs (hospital overhead costs) and indirect costs, (medical, surgical, technical settings and net general service expenses). The calculation of HH costs and ORH costs were based on the average daily charge of these departments. The cost of primary THA was used as the reference.We then compared our surgical costs with those found for the corresponding comparable hospital stay groups (Groupes homogènes de séjour). The average hospital stay (AHS) was 7.5 +/- 1.8 days for primary THA, 8.9 +/- 2.2 days for non-infected revisions and 30.6 +/- 14.9 days for revisions due to infection

  4. Historical and projected costs of natural disasters

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.

    1995-04-01

    Natural disasters cause billions of dollars of damage and thousands Of deaths globally each year. While the magnitude is clear, the exact costs (in damage and fatalities) are difficult to clearly identify. This document reports on the results of a survey of data on the costs associated with significant natural disasters. There is an impressive amount of work and effort going into natural disaster research, mitigation, and relief. However, despite this effort, there are surprisingly few consistent and reliable data available regarding the effects of natural disasters. Even lacking consistent and complete data, it is clear that the damage and fatalities from natural disasters are increasing, both in the United States, and globally. Projections using the available data suggest that, in the United States alone, the costs of natural disasters between 1995 and 2010 will be in the range of $90 billion (94$) and 5000 lives.

  5. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  6. Supplier managed inventory in the OEM supply chain : the impact of relationship types on total costs and cost distribution

    NARCIS (Netherlands)

    Nyen, van P.L.M.; Bertrand, J.W.M.; Ooijen, van H.P.G.; Vandaele, N.J.

    2009-01-01

    We investigate the impact of four variants of supplier managed inventory on total costs and cost distribution in a capital goods supply chain consisting of a parts supplier who delivers parts to an original equipment manufacturer’s assembly plant. The four supplier managed inventory variants differ

  7. Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

    Science.gov (United States)

    Carlisle, Candace

    2018-01-01

    TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

  8. Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling

    Science.gov (United States)

    Fryling, Meg

    2010-11-01

    Organisations often make implementation decisions with little consideration for the maintenance phase of an enterprise resource planning (ERP) system, resulting in significant recurring maintenance costs. Poor cost estimations are likely related to the lack of an appropriate framework for enterprise-wide pre-packaged software maintenance, which requires an ongoing relationship with the software vendor (Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4), 42-46). The end result is that critical project decisions are made with little empirical data, resulting in substantial long-term cost impacts. The product of this research is a formal dynamic simulation model that enables theory testing, scenario exploration and policy analysis. The simulation model ERPMAINT1 was developed by combining and extending existing frameworks in several research domains, and by incorporating quantitative and qualitative case study data. The ERPMAINT1 model evaluates tradeoffs between different ERP project management decisions and their impact on post-implementation total cost of ownership (TCO). Through model simulations a variety of dynamic insights were revealed that could assist ERP project managers. Major findings from the simulation show that upfront investments in mentoring and system exposure translate to long-term cost savings. The findings also indicate that in addition to customisations, add-ons have a significant impact on TCO.

  9. Permanent magnet design for magnetic heat pumps using total cost minimization

    Science.gov (United States)

    Teyber, R.; Trevizoli, P. V.; Christiaanse, T. V.; Govindappa, P.; Niknia, I.; Rowe, A.

    2017-11-01

    The active magnetic regenerator (AMR) is an attractive technology for efficient heat pumps and cooling systems. The costs associated with a permanent magnet for near room temperature applications are a central issue which must be solved for broad market implementation. To address this problem, we present a permanent magnet topology optimization to minimize the total cost of cooling using a thermoeconomic cost-rate balance coupled with an AMR model. A genetic algorithm identifies cost-minimizing magnet topologies. For a fixed temperature span of 15 K and 4.2 kg of gadolinium, the optimal magnet configuration provides 3.3 kW of cooling power with a second law efficiency (ηII) of 0.33 using 16.3 kg of permanent magnet material.

  10. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  11. Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs

    Directory of Open Access Journals (Sweden)

    Queena K. Qian

    2015-03-01

    Full Text Available Delivering green building (GB projects involve some activities that are atypical in comparison with conventional buildings. Such new activities are characterized by uncertainty, and they incur hidden costs that have not been expected nor are they readily appreciated among the stakeholders. This paper develops a typology and chronology to examine the new activities that are associated with transaction costs (TCs in the real estate development process (REDP of green building. Through in-depth interviews with representatives from the major developers in Hong Kong who have experiences in GB practice, this study aims to unearth TCs involved at the critical stages of the REDP. Apart from reconfirming the early project planning stage as the most critical in the consideration of TCs, the study results also identified “extra legal liability risk of the GB product” as the major concern for any GB developer in Hong Kong. The key additional activities that bring significant TCs in developing GB are identified and compared to their traditional counterparts. In turn, project managers not only have to pursue overall cost management whilst winning more business, but they also have to pay particular attention to sustainability in order to minimize hidden societal costs. The study also provides a reference for governments and professionals that will aid in forming policy as well as advance the practice of the GB market by optimizing the societal costs.

  12. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  13. Deep water tie-back economics capex vs opex and the total costs

    Energy Technology Data Exchange (ETDEWEB)

    Tarlton, Oran D. [Oil States Industries Inc., Arlington, TX (United States)

    2005-07-01

    This paper explores the real cost and time benefits associated with the current, past, and future contracting strategies associated with subsea developments. It looks at the real cost associated with out sourcing engineering development and the impact of engineering, procurement, installation, and construction (EPIC) contracts. Development costs are first and foremost in the minds of operators as a field is analyzed for development potential. The cycle starts with an analysis of the geological information to estimate the potential value in the field. It proceeds to conceptual design where the first development methodology and cost estimates are prepared. If the project is initially viable it will proceed from conceptual design to Front End Engineering and Design (FEED) where a complete development plan is prepared with possible options and recommendations. Engineering companies may as a part of the FEED prepare a Request for Quotation (RFQ) which is sent to potential suppliers. As part of a FEED contract, an engineering company may also review responses to the RFQ and provide recommendations for selected suppliers. Typically large subsea projects are divided into several major categories such as: topsides; subsea production systems; wells; subsea umbilical risers and glow lines (SURF), and commissioning in order to simplify management and procurement. Many times these contracts are awarded as EPIC contracts to further simplify management and internal procurement efforts. A case study is presented which challenges current contracting strategies and presents an option for a lower cost and a better way forward with respect to the short term and a focus on the long term. (author)

  14. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: executive summary

    International Nuclear Information System (INIS)

    1985-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's Civilian Radioactive Waste Management Progrram is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report is an input into the third evaluation of the adequacy of the fee. The total-system cost for the reference waste-management program in this analysis is estimated to be 24 to 30 billion (1984) dollars. For the sensitivity cases studied in this report, the costs could be as high as 35 billion dollars and as low as 21 billion dollars. Because factors like repository location, the quantity of waste generated, transportation-cask technology, and repository startup dates exert substantial impacts on total-system costs, there are several tradeoffs between these factors, and these tradeoffs can greatly influence the total cost of the program. The total-system cost for the reference program described in this report is higher by 3 to 5 billion dollars, or 15 to 20%, than the cost for the reference program of the TSLCC analysis of April 1984. More than two-thirds of this increase is in the cost of repository construction and operation. These repository costs have increased because of changing design concepts, different assumptions about the effort required to perform the necessary activities, and a change in the source data on which the earlier analysis was based. Development and evaluation costs have similarly increased because of a net addition to the work content. Transportation costs have increased because of different assumptions about repository locations and several characteristics of the transportation system. It is expected that the estimates of total-system costs will continue to change in response to both an evolving program strategy and better definition of the work required to achieve the program objectives

  15. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  16. evaluation of total annual costs of heat exchanger networks using

    African Journals Online (AJOL)

    This study presents pinch analysis of some heat exchanger networks (HENs) problems using Hint integration (HINT) software. Three examples reported to have been solved using different approaches by various researchers to obtain the least possible total annual cost (TAC) were solved using the Hint software. In this work ...

  17. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  18. Total cost estimates for large-scale wind scenarios in UK

    International Nuclear Information System (INIS)

    Dale, Lewis; Milborrow, David; Slark, Richard; Strbac, Goran

    2004-01-01

    The recent UK Energy White Paper suggested that the Government should aim to secure 20% of electricity from renewable sources by 2020. A number of estimates of the extra cost of such a commitment have been made, but these have not necessarily included all the relevant cost components. This analysis sets out to identify these and to calculate the extra cost to the electricity consumer, assuming all the renewable electricity is sourced from wind energy. This enables one of the more controversial issues--the implications of wind intermittency--to be addressed. The basis of the assumptions associated with generating costs, extra balancing costs and distribution and transmission system reinforcement costs are all clearly identified and the total costs of a '20% wind' scenario are compared with a scenario where a similar amount of energy is generated by gas-fired plant. This enables the extra costs of the renewables scenario to be determined. The central estimate of the extra costs to electricity consumers is just over 0.3 p/kW h in current prices (around 5% extra on average domestic unit prices). Sensitivity analyses examine the implications of differing assumptions. The extra cost would rise if the capital costs of wind generation fall slower than anticipated, but would fall if gas prices rise more rapidly than has been assumed, or if wind plant are more productive. Even if it is assumed that wind has no capacity displacement value, the added cost to the electricity consumer rises by less than 0.1 p/kW h. It is concluded that there does not appear to be any technical reason why a substantial proportion of the country's electricity requirements could not be delivered by wind

  19. The adoption of total cost of ownership for sourcing decisions - a structural equations analysis

    NARCIS (Netherlands)

    Wouters, Marc; Anderson, James C.; Wynstra, Finn

    2005-01-01

    This study investigates the adoption of total cost of ownership (TCO) analysis to improve sourcing decisions. TCO can be seen as an application of activity based costing (ABC) that quantifies the costs that are involved in acquiring and using purchased goods or services. TCO supports purchasing

  20. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  1. Primary vs Conversion Total Hip Arthroplasty: A Cost Analysis

    Science.gov (United States)

    Chin, Garwin; Wright, David J.; Snir, Nimrod; Schwarzkopf, Ran

    2018-01-01

    Introduction Increasing hip fracture incidence in the United States is leading to higher occurrences of conversion total hip arthroplasty (THA) for failed surgical treatment of the hip. In spite of studies showing higher complication rates in conversion THA, the Centers for Medicare and Medicaid services currently bundles conversion and primary THA under the same diagnosis-related group. We examined the cost of treatment of conversion THA compared with primary THA. Our hypothesis is that conversion THA will have higher cost and resource use than primary THA. Methods Fifty-one consecutive conversion THA patients (Current Procedure Terminology code 27132) and 105 matched primary THA patients (Current Procedure Terminology code 27130) were included in this study. The natural log-transformed costs for conversion and primary THA were compared using regression analysis. Age, gender, body mass index, American Society of Anesthesiologist, Charlson comorbidity score, and smoker status were controlled in the analysis. Conversion THA subgroups formed based on etiology were compared using analysis of variance analysis. Results Conversion and primary THAs were determined to be significantly different (P conversion THA has significantly greater cost and resource use than primary THA. In order to prevent disincentives for treating these complex surgical patients, reclassification of conversion THA is needed, as they do not fit together with primary THA. PMID:26387923

  2. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  3. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  4. Internal Logistics System Selection with Total Cost of Ownership Analysis

    Science.gov (United States)

    Araújo, Inês; Pimentel, Carina; Godina, Radu; Matias, João C. O.

    2017-06-01

    In this paper a methodology was followed in order to support the decision-making of one industrial unit regarding its internal logistics system. The addressed factory was facing issues with their internal logistics approach. Some alternatives were pointed out and a proper total cost of ownership (TCO) analysis was developed. This analysis was taken in order to demonstrate the more cost-effective solution for the internal logistics system. This tool is more and more valued by the companies, due to their willing to reduce the costs that are associated with the way of doing business. Despite the proposal of the best choice for the internal logistics system of the enterprise, this study also intends to present some conclusions about the match between the nature of the industrial unit and the logistics systems that best fit the requirements of those.

  5. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  6. Time-driven activity based costing of total knee replacement surgery at a London teaching hospital.

    Science.gov (United States)

    Chen, Alvin; Sabharwal, Sanjeeve; Akhtar, Kashif; Makaram, Navnit; Gupte, Chinmay M

    2015-12-01

    The aim of this study was to conduct a time-driven activity based costing (TDABC) analysis of the clinical pathway for total knee replacement (TKR) and to determine where the major cost drivers lay. The in-patient pathway was prospectively mapped utilising a TDABC model, following 20 TKRs. The mean age for these patients was 73.4 years. All patients were ASA grade I or II and their mean BMI was 30.4. The 14 varus knees had a mean deformity of 5.32° and the six valgus knee had a mean deformity of 10.83°. Timings were prospectively collected as each patient was followed through the TKR pathway. Pre-operative costs including pre-assessment and joint school were £ 163. Total staff costs for admission and the operating theatre were £ 658. Consumables cost for the operating theatre were £ 1862. The average length of stay was 5.25 days at a total cost of £ 910. Trust overheads contributed £ 1651. The overall institutional cost of a 'noncomplex' TKR in patients without substantial medical co-morbidities was estimated to be £ 5422, representing a profit of £ 1065 based on a best practice tariff of £ 6487. The major cost drivers in the TKR pathway were determined to be theatre consumables, corporate overheads, overall ward cost and operating theatre staffing costs. Appropriate discounting of implant costs, reduction in length of stay by adopting an enhanced recovery programme and control of corporate overheads through the use of elective orthopaedic treatment centres are proposed approaches for reducing the overall cost of treatment. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. Cost of Radiotherapy Versus NSAID Administration for Prevention of Heterotopic Ossification After Total Hip Arthroplasty

    International Nuclear Information System (INIS)

    Strauss, Jonathan B.; Chen, Sea S.; Shah, Anand P.; Coon, Alan B.; Dickler, Adam

    2008-01-01

    Purpose: Heterotopic ossification (HO), or abnormal bone formation, is a common sequela of total hip arthroplasty. This abnormal bone can impair joint function and must be surgically removed to restore mobility. HO can be prevented by postoperative nonsteroidal anti-inflammatory drug (NSAID) use or radiotherapy (RT). NSAIDs are associated with multiple toxicities, including gastrointestinal bleeding. Although RT has been shown to be more efficacious than NSAIDs at preventing HO, its cost-effectiveness has been questioned. Methods and Materials: We performed an analysis of the cost of postoperative RT to the hip compared with NSAID administration, taking into account the costs of surgery for HO formation, treatment-induced morbidity, and productivity loss from missed work. The costs of RT, surgical revision, and treatment of gastrointestinal bleeding were estimated using the 2007 Medicare Fee Schedule and inpatient diagnosis-related group codes. The cost of lost wages was estimated using the 2006 median salary data from the U.S. Census Bureau. Results: The cost of administering RT was estimated at $899 vs. $20 for NSAID use. After accounting for the additional costs associated with revision total hip arthroplasty and gastrointestinal bleeding, the corresponding estimated costs were $1,208 vs. $930. Conclusion: If the costs associated with treatment failure and treatment-induced morbidity are considered, the cost of NSAIDs approaches that of RT. Other NSAID morbidities and quality-of-life differences that are difficult to quantify add to the cost of NSAIDs. These considerations have led us to recommend RT as the preferred modality for use in prophylaxis against HO after total hip arthroplasty, even when the cost is considered

  8. Time-based analysis of total cost of patient episodes: a case study of hip replacement.

    Science.gov (United States)

    Peltokorpi, Antti; Kujala, Jaakko

    2006-01-01

    Healthcare in the public and private sectors is facing increasing pressure to become more cost-effective. Time-based competition and work-in-progress have been used successfully to measure and improve the efficiency of industrial manufacturing. Seeks to address this issue. Presents a framework for time based management of the total cost of a patient episode and apply it to the six sigma DMAIC-process development approach. The framework is used to analyse hip replacement patient episodes in Päijät-Häme Hospital District in Finland, which has a catchment area of 210,000 inhabitants and performs an average of 230 hip replacements per year. The work-in-progress concept is applicable to healthcare--notably that the DMAIC-process development approach can be used to analyse the total cost of patient episodes. Concludes that a framework, which combines the patient-in-process and the DMAIC development approach, can be used not only to analyse the total cost of patient episode but also to improve patient process efficiency. Presents a framework that combines patient-in-process and DMAIC-process development approaches, which can be used to analyse the total cost of a patient episode in order to improve patient process efficiency.

  9. 12 CFR Appendix K to Part 226 - Total Annual Loan Cost Rate Computations for Reverse Mortgage Transactions

    Science.gov (United States)

    2010-01-01

    ... Appendix K to Part 226—Total Annual Loan Cost Rate Computations for Reverse Mortgage Transactions (a... loan cost rate for various transactions, as well as instructions, explanations, and examples for.... (2) Term of the transaction. For purposes of total annual loan cost disclosures, the term of a...

  10. Preliminary estimates of the total-system cost for the restructured program: An addendum to the May 1989 analysis of the total-system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1990-12-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 - a fee levied on electricity generated and sold by commercial nuclear power plants - is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee. The costs contained in this report represent a preliminary analysis of the cost impacts associated with the Secretary of Energy's Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program issued in November 1989. The major elements of the restructured program announced in this report which pertain to the program's life-cycle costs are: a prioritization of the scientific investigations program at the Yucca Mountain candidate site to focus on identification of potentially adverse conditions, a delay in the start of repository operations until 2010, the start of limited waste acceptance at the monitored retrievable storage (MRS) facility in 1998, and the start of waste acceptance at the full-capability MRS facility in 2,000. Based on the restructured program, the total-system cost for the system with a repository at the candidate site at Yucca Mountain in Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $26 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $34 to $35 billion, depending on the quantity of spent fuel and high-level waste (HLW) requiring disposal. 17 figs., 17 tabs

  11. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  12. Total inpatient treatment costs in patients with severe burns: towards a more accurate reimbursement model.

    Science.gov (United States)

    Mehra, Tarun; Koljonen, Virve; Seifert, Burkhardt; Volbracht, Jörk; Giovanoli, Pietro; Plock, Jan; Moos, Rudolf Maria

    2015-01-01

    Reimbursement systems have difficulties depicting the actual cost of burn treatment, leaving care providers with a significant financial burden. Our aim was to establish a simple and accurate reimbursement model compatible with prospective payment systems. A total of 370 966 electronic medical records of patients discharged in 2012 to 2013 from Swiss university hospitals were reviewed. A total of 828 cases of burns including 109 cases of severe burns were retained. Costs, revenues and earnings for severe and nonsevere burns were analysed and a linear regression model predicting total inpatient treatment costs was established. The median total costs per case for severe burns was tenfold higher than for nonsevere burns (179 949 CHF [167 353 EUR] vs 11 312 CHF [10 520 EUR], interquartile ranges 96 782-328 618 CHF vs 4 874-27 783 CHF, p <0.001). The median of earnings per case for nonsevere burns was 588 CHF (547 EUR) (interquartile range -6 720 - 5 354 CHF) whereas severe burns incurred a large financial loss to care providers, with median earnings of -33 178 CHF (30 856 EUR) (interquartile range -95 533 - 23 662 CHF). Differences were highly significant (p <0.001). Our linear regression model predicting total costs per case with length of stay (LOS) as independent variable had an adjusted R2 of 0.67 (p <0.001 for LOS). Severe burns are systematically underfunded within the Swiss reimbursement system. Flat-rate DRG-based refunds poorly reflect the actual treatment costs. In conclusion, we suggest a reimbursement model based on a per diem rate for treatment of severe burns.

  13. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  14. Cost-effectivness analysis of total thyroidectomy vs radioiodine for Graves disease

    Directory of Open Access Journals (Sweden)

    Prokić Anđelka

    2013-01-01

    Full Text Available Among the patients suffering from hyperthyroidism 60-80% have Graves' disease. The initial therapy of Graves's disease are antithyroid drugs. If the remission is not achieved after 12-18 months, the patients should be directed to surgical treatment or to the therapy with radioactive iodine. The aim of this study was to compare cost/effectiveness ratios for radioactive iodine and total thyroidectomy. The analysis was made using Markov model, from the perspective of Republic Fund for Health Insurance in Serbia. Duration of one cycle in the model is six months, and the time horizon is 30 years. Monte Carlo simulation was performed for 1000 virtual patients as well as the analysis of sensitivity with the variation of parameters ± 50%. For total thyroidectomy the insurance should provide 138.389,72 RSD / 57, 83 QALY i.e. 2.393,04 dinars for one quality-adjusted life year, and for radioactive iodine the insurance should provide 110.043,64 RSD / 57,82 QALY i.e. 1.903,37 dinars for one quality-adjusted life year. This economic analysis showed that radioactive iodine has better ratio of costs to clinical effectiveness as opposed to total thyroidectomy.

  15. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  16. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  17. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1989-05-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 -- a fee levied on electricity generated in commercial nuclear power plants -- is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee and is consistent with the program strategy and plans contained in the DOE's Draft 1988 Mission Plan Amendment. The total-system cost for the system with a repository at Yucca Mountain, Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $24 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $31 to $33 billion, depending on the quantity of spent fuel to be disposed of. The $7 billion cost savings for the single-repository system in comparison with the two-repository system is due to the elimination of $3 billion for second-repository development and $7 billion for the second-repository facility. These savings are offset by $2 billion in additional costs at the first repository and $1 billion in combined higher costs for the MRS facility and transportation. 55 refs., 2 figs., 24 tabs

  18. Genetic algorithm for project time-cost optimization in fuzzy environment

    Directory of Open Access Journals (Sweden)

    Khan Md. Ariful Haque

    2012-12-01

    Full Text Available Purpose: The aim of this research is to develop a more realistic approach to solve project time-cost optimization problem under uncertain conditions, with fuzzy time periods. Design/methodology/approach: Deterministic models for time-cost optimization are never efficient considering various uncertainty factors. To make such problems realistic, triangular fuzzy numbers and the concept of a-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, Genetic Algorithm (GA has been used as a searching tool. Finally, Dev-C++ 4.9.9.2 has been used to code this solver. Findings: The solution has been performed under different combinations of GA parameters and after result analysis optimum values of those parameters have been found for the best solution. Research limitations/implications: For demonstration of the application of the developed algorithm, a project on new product (Pre-paid electric meter, a project under government finance launching has been chosen as a real case. The algorithm is developed under some assumptions. Practical implications: The proposed model leads decision makers to choose the desired solution under different risk levels. Originality/value: Reports reveal that project optimization problems have never been solved under multiple uncertainty conditions. Here, the function has been optimized using Genetic Algorithm search technique, with varied level of risks and fuzzy time periods.

  19. New vaccines against otitis media: projected benefits and cost-effectiveness.

    Science.gov (United States)

    O'Brien, Megan A; Prosser, Lisa A; Paradise, Jack L; Ray, G Thomas; Kulldorff, Martin; Kurs-Lasky, Marcia; Hinrichsen, Virginia L; Mehta, Jyotsna; Colborn, D Kathleen; Lieu, Tracy A

    2009-06-01

    New vaccines that offer protection against otitis media caused by nontypeable Haemophilus influenzae and by Moraxella catarrhalis are under development. However, the potential health benefits and economic effects of such candidate vaccines have not been systematically assessed. We created a computerized model to compare the projected benefits and costs of (1) the currently available 7-valent pneumococcal conjugate vaccine, (2) a candidate pneumococcal-nontypeable H influenzae vaccine that has been tested in Europe, (3) a hypothetical pneumococcal-nontypeable H influenzae-Moraxella vaccine, and (4) no vaccination. The clinical probabilities of acute otitis media and of otitis media with effusion were generated from multivariate analyses of data from 2 large health maintenance organizations and from the Pittsburgh Child Development/Otitis Media Study cohort. Other probabilities, costs, and quality-of-life values were derived from published and unpublished sources. The base-case analysis assumed vaccine dose costs of $65 for the 7-valent pneumococcal conjugate vaccine, $100 for the pneumococcal-nontypeable H influenzae vaccine, and $125 for the pneumococcal-nontypeable H influenzae-Moraxella vaccine. With no vaccination, we projected that 13.7 million episodes of acute otitis media would occur annually in US children aged 0 to 4 years, at an annual cost of $3.8 billion. The 7-valent pneumococcal conjugate vaccine was projected to prevent 878,000 acute otitis media episodes, or 6.4% of those that would occur with no vaccination; the corresponding value for the pneumococcal-nontypeable H influenzae vaccine was 3.7 million (27%) and for the pneumococcal-nontypeable H influenzae-Moraxella vaccine was 4.2 million (31%). Using the base-case vaccine costs, pneumococcal-nontypeable H influenzae vaccine use would result in net savings compared with nontypeable 7-valent pneumococcal conjugate use. Conversely, pneumococcal-nontypeable H influenzae-Moraxella vaccine use would not

  20. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  1. Towards canine rabies elimination: Economic comparisons of three project sites.

    Science.gov (United States)

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  2. Total cost of ownership in the services sector: A case study

    NARCIS (Netherlands)

    K. Hurkens (Krisje); W. van der Valk (Wendy); J.Y.F. Wynstra (Finn)

    2006-01-01

    textabstractFew detailed studies exist of the trade-offs to be made when developing a comprehensive, strategically focused total cost of ownership (TCO) model. Moreover, most studies of TCO have been conducted in manufacturing firms, with little or no TCO research directed toward service

  3. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  4. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  5. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  6. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  7. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  8. A modified earned value management using activity based costing

    Directory of Open Access Journals (Sweden)

    Vahid Aminian

    2016-12-01

    Full Text Available Earned Value Management (EVM has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project perfor-mance. This system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems, or to exploit project opportunities. A key aspect of EVM is to estimate the completion cost of a project by considering both cost and schedule performance indices. However, good performance of cost and schedule performance indices does not necessarily guarantee cost effec-tiveness of the project regardless of the overhead costs. The reason is because, in most project-based organizations, overhead costs constitute a significant proportion of the total costs. Howev-er, EVM indices are usually calculated in the absence of the so-called overhead costs. This paper, first, seeks to remedy this problem by proposing a practical procedure of allocating overhead costs in project-based organizations. Then the traditional EVM indices are revised by consider-ing the allocated overhead costs. Finally, a case study demonstrates the applicability of the pro-posed method for a real-life project.

  9. Long-range planning cost model for support of future space missions by the deep space network

    Science.gov (United States)

    Sherif, J. S.; Remer, D. S.; Buchanan, H. R.

    1990-01-01

    A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.

  10. Implicit environmental costs in hydroelectric development

    International Nuclear Information System (INIS)

    Carlsen, A.J.; Wenstoep, F.; Strand, J.

    1992-01-01

    The ranking of hydropower projects under the Norwegian Master Plan for Water Resources is used to derive implicit government preferences for a number of environmental attributes described by ordinal scores for each project. Higher negative scores are generally associated with greater implicit willingness to pay to avoid the environmental damage tied to the attribute, caused by hydropower development. The total (ordinary economic and implicit environmental) cost for each project are derived, and the environmental costs per capacity unit are found to be on the same order as the economic costs, lower for projects ranked for early exploitation, and higher for projects to be saved permanently. An implicit long-run marginal cost curve for Norwegian hydropower development is derived, which is generally upward sloping, but not uniformly so. This can be due to the model specification problems or ranking inconsistencies, both of which are likely to be present. 11 refs., 7 figs., 1 tab

  11. The total lifetime costs of smoking

    DEFF Research Database (Denmark)

    Rasmussen, S.R.; Prescott, E.; Sørensen, T.I.A.

    2004-01-01

    Net costs of smoking in a lifetime perspective and, hence, the economic interests in antismoking policies have been questioned. It has been proposed that the health-related costs of smoking are balanced by smaller expenditure due to shorter life expectancy.......Net costs of smoking in a lifetime perspective and, hence, the economic interests in antismoking policies have been questioned. It has been proposed that the health-related costs of smoking are balanced by smaller expenditure due to shorter life expectancy....

  12. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  13. Evaluation of the Overall Costs for the Croatian Repository: Varying Site, Design and Financial Parameters

    International Nuclear Information System (INIS)

    Kucar-Dragicevic, S.; Subasic, D.; Lebegner, J.

    2000-01-01

    Preliminary preparations for the construction of a LILW repository in Croatia included a number of activities and projects related to the siting process, safety assessment, disposal technology and repository design, and public acceptance issues. Costs evaluations have always been a part of the developing project documentation. However, only the estimates of the facility construction and equipment acquisition costs had been included, while other costs associated with the project development and management have not been considered up to now. For the first time the infrastructure status at the potential sites has been evaluated, and the costs of the repository operations as well as the post-closure management has been estimated. Cost parameters have been considered from both technical and fiscal points of view, comparing their relative influence on the overall repository costs. Assessment of the total project costs in eight cases for the four preferential sites and two repository designs gave a clearer picture of the development and management costs differences for the considered options. Without considerations of the operational and post-operational repository management expenses, the total project costs appear to have been heavily underestimated. Also, while the construction costs for the tunnel and the surface type repositories are significantly different, this influence of the repository type on the total project costs becomes far less important when the later phases management expenses are added. Finally, the role of fiscal parameters may further diminish the site and technology impacts on the overall costs. (author)

  14. Review of nuclear power costs around the world

    International Nuclear Information System (INIS)

    Bennett, L.L.; Karousakis, P.M.; Moynet, G.

    1983-01-01

    This paper presents highlights of nuclear power costs around the world from studies carried out by the IAEA and by UNIPEDE. Emphasis is placed on trends within each country of key parameters which affect both investment costs and total power generation costs, including construction and project durations, size of units, regulatory environment, scope of project, fuel cycle costs and general economic conditions. A synthesis of these trends, taking into consideration both nuclear and coal-fired plant capital and fuel costs as they are estimated to evolve in the near and medium term, is presented in terms of nuclear-to-coal cost ratios for both plant investment costs and total generating costs. The plant investment costs are expressed as ''overnight'' or ''fore'' costs, in constant money, for plants expected to enter commercial operation in the early 1990s. Pertinent assumptions are based on conditions prevailing in the particular country under review. These studies indicate that in most countries nuclear plant investment costs are rising more rapidly than the costs for coal-fired plants. A major cause for the rapid rise in nuclear plant costs is the drastic lengthening of project duration in most countries. France, as a notable exception, has been able to maintain a stable and reasonably short project time. In spite of the rapidly escalating nuclear plant investment costs, nuclear electricity generation has an economic advantage over coal in Europe and Canada and is competitive with coal in the eastern and midwestern parts of the United States of America (USA). The availability of abundant, low-cost coal gives coal-fired generation an economic advantage in the western USA. (author)

  15. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  16. Self-reported Function, Health Resource Use, and Total Health Care Costs Among Medicare Beneficiaries With Glaucoma.

    Science.gov (United States)

    Prager, Alisa J; Liebmann, Jeffrey M; Cioffi, George A; Blumberg, Dana M

    2016-04-01

    The effect of glaucoma on nonglaucomatous medical conditions and resultant secondary health care costs is not well understood. To assess self-reported medical conditions, the use of medical services, and total health care costs among Medicare beneficiaries with glaucoma. Longitudinal observational study of 72,587 Medicare beneficiaries in the general community using the Medicare Current Beneficiary Survey (2004-2009). Coding to extract data started in January 2015, and analyses were performed between May and July 2015. Self-reported health, the use of health care services, adjusted mean annual total health care costs per person, and adjusted mean annual nonoutpatient costs per person. Participants were 72,587 Medicare beneficiaries 65 years or older with (n = 4441) and without (n = 68,146) a glaucoma diagnosis in the year before collection of survey data. Their mean age was 76.9 years, and 43.2% were male. Patients with glaucoma who responded to survey questions on visual disability were stratified into those with (n = 1748) and without (n = 2639) self-reported visual disability. Medicare beneficiaries with glaucoma had higher adjusted odds of inpatient hospitalizations (odds ratio [OR], 1.27; 95% CI, 1.17-1.39; P total health care costs and $2599 (95% CI, $1985-$3212; P total and nonoutpatient medical costs. Perception of vision loss among patients with glaucoma may be associated with depression, falls, and difficulty walking. Reducing the prevalence and severity of glaucoma may result in improvements in associated nonglaucomatous medical conditions and resultant reduction in health care costs.

  17. Controlling nuclear retrofit costs

    International Nuclear Information System (INIS)

    Gruber, C.O.

    1985-01-01

    Increased safety regulations that required modifications to nuclear power plants have had an impact on the capital and expense budgets of utilities. The author addresses the budgeting and control of project-related expenditures, and notes the importance of total cost management throughout the project's life cycle. That total includes the systems, procedures, personnel, expertise, and organization involved in the process. A rational and structured evaluation process at the beginning, realistic targets, and an organizational framework are key components. 2 references, 3 figures, 1 table

  18. AN ENHANCED MODEL TO ESTIMATE EFFORT, PERFORMANCE AND COST OF THE SOFTWARE PROJECTS

    Directory of Open Access Journals (Sweden)

    M. Pauline

    2013-04-01

    Full Text Available The Authors have proposed a model that first captures the fundamentals of software metrics in the phase 1 consisting of three primitive primary software engineering metrics; they are person-months (PM, function-points (FP, and lines of code (LOC. The phase 2 consists of the proposed function point which is obtained by grouping the adjustment factors to simplify the process of adjustment and to ensure more consistency in the adjustments. In the proposed method fuzzy logic is used for quantifying the quality of requirements and is added as one of the adjustment factor, thus a fuzzy based approach for the Enhanced General System Characteristics to Estimate Effort of the Software Projects using productivity has been obtained. The phase 3 takes the calculated function point from our work and is given as input to the static single variable model (i.e. to the Intermediate COCOMO and COCOMO II for cost estimation. The Authors have tailored the cost factors in intermediate COCOMO and both; cost and scale factors are tailored in COCOMO II to suite to the individual development environment, which is very important for the accuracy of the cost estimates. The software performance indicators are project duration, schedule predictability, requirements completion ratio and post-release defect density, are also measured for the software projects in my work. A comparative study for effort, performance measurement and cost estimation of the software project is done between the existing model and the authors proposed work. Thus our work analyzes the interaction¬al process through which the estimation tasks were collectively accomplished.

  19. Multiobjective optimization applied to structural sizing of low cost university-class microsatellite projects

    Science.gov (United States)

    Ravanbakhsh, Ali; Franchini, Sebastián

    2012-10-01

    In recent years, there has been continuing interest in the participation of university research groups in space technology studies by means of their own microsatellites. The involvement in such projects has some inherent challenges, such as limited budget and facilities. Also, due to the fact that the main objective of these projects is for educational purposes, usually there are uncertainties regarding their in orbit mission and scientific payloads at the early phases of the project. On the other hand, there are predetermined limitations for their mass and volume budgets owing to the fact that most of them are launched as an auxiliary payload in which the launch cost is reduced considerably. The satellite structure subsystem is the one which is most affected by the launcher constraints. This can affect different aspects, including dimensions, strength and frequency requirements. In this paper, the main focus is on developing a structural design sizing tool containing not only the primary structures properties as variables but also the system level variables such as payload mass budget and satellite total mass and dimensions. This approach enables the design team to obtain better insight into the design in an extended design envelope. The structural design sizing tool is based on analytical structural design formulas and appropriate assumptions including both static and dynamic models of the satellite. Finally, a Genetic Algorithm (GA) multiobjective optimization is applied to the design space. The result is a Pareto-optimal based on two objectives, minimum satellite total mass and maximum payload mass budget, which gives a useful insight to the design team at the early phases of the design.

  20. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    Science.gov (United States)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  1. A METHOD OF THE MINIMIZING OF THE TOTAL ACQUISITIONS COST WITH THE INCREASING VARIABLE DEMAND

    Directory of Open Access Journals (Sweden)

    ELEONORA IONELA FOCȘAN

    2015-12-01

    Full Text Available Over time, mankind has tried to find different ways of costs reduction. This subject which we are facing more often nowadays, has been detailed studied, without reaching a general model, and also efficient, regarding the costs reduction. Costs reduction entails a number of benefits over the entity, the most important being: increase revenue and default to the profit, increase productivity, a higher level of services / products offered to clients, and last but not least, the risk mitigation of the economic deficit. Therefore, each entity search different modes to obtain most benefits, for the company to succeed in a competitive market. This article supports the companies, trying to make known a new way of minimizing the total cost of acquisitions, by presenting some hypotheses about the increasing variable demand, proving them, and development of formulas for reducing the costs. The hypotheses presented in the model described below, can be maximally exploited to obtain new models of reducing the total cost, according to the modes of the purchase of entities which approach it.

  2. Capital-cost behavior: is nuclear different

    International Nuclear Information System (INIS)

    Lotze, C.D.; Riordan, B.J.

    1978-01-01

    The capital costs of coal-fired and nuclear power plants are found to be comparable when costs for pollution control are included. Trends in capital costs reveal a similar rate gain that retains the same economic balance. Graphs of selected cost indices are used to show that the rapid increase in direct construction costs is not unique to nuclear plants, those of hydroelectric plants as well as coal-fired having the same pattern. Comparisons of indirect capital costs, based on analyses of direct capital and total capital costs, show estimated average growth rates of total costs to be 14% for coal and 13.6% for nuclear, while direct cost growth rates are 10.2% and 10.4%. The economics of market competition can be expected to push alternative energy source projects into balance

  3. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  4. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  5. Efforts to Support Consumer Enrollment Decisions Using Total Cost Estimators: Lessons from the Affordable Care Act’s Marketplaces.

    Science.gov (United States)

    Giovannelli, Justin; Curran, Emily

    2017-02-01

    Issue: Policymakers have sought to improve the shopping experience on the Affordable Care Act’s marketplaces by offering decision support tools that help consumers better understand and compare their health plan options. Cost estimators are one such tool. They are designed to provide consumers a personalized estimate of the total cost--premium, minus subsidy, plus cost-sharing--of their coverage options. Cost estimators were available in most states by the start of the fourth open enrollment period. Goal: To understand the experiences of marketplaces that offer a total cost estimator and the interests and concerns of policymakers from states that are not using them. Methods: Structured interviews with marketplace officials, consumer enrollment assisters, technology vendors, and subject matter experts; analysis of the total cost estimators available on the marketplaces as of October 2016. Key findings and conclusions: Informants strongly supported marketplace adoption of a total cost estimator. Marketplaces that offer an estimator faced a range of design choices and varied significantly in their approaches to resolving them. Interviews suggested a clear need for additional consumer testing and data analysis of tool usage and for sustained outreach to enrollment assisters to encourage greater use of the estimators.

  6. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  7. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  8. Environmentally based Cost-Benefit Analysis

    International Nuclear Information System (INIS)

    Magnell, M.

    1993-11-01

    The fundamentals of the basic elements of a new comprehensive economic assessment, MILA, developed in Sweden with inspiration from the Total Cost Assessment-model are presented. The core of the MILA approach is an expanded cost and benefit inventory. But MILA also includes a complementary addition of an internal waste stream analysis, a tool for evaluation of environmental conflicts in monetary terms, an extended time horizon and direct allocation of costs and revenues to products and processes. However, MILA does not ensure profitability for environmentally sound projects. Essentially, MILA is an approach of refining investment and profitability analysis of a project, investment or product. 109 refs., 38 figs

  9. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  10. Incorporating psychological influences in probabilistic cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kujawski, Edouard; Alvaro, Mariana; Edwards, William

    2004-01-08

    Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations that are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for

  11. Changes in Energy Cost and Total External Work of Muscles in Elite Race Walkers Walking at Different Speeds

    Directory of Open Access Journals (Sweden)

    Chwała Wiesław

    2014-12-01

    Full Text Available The aim of the study was to assess energy cost and total external work (total energy depending on the speed of race walking. Another objective was to determine the contribution of external work to total energy cost of walking at technical, threshold and racing speed in elite competitive race walkers.

  12. Project-based physics labs using low-cost open-source hardware

    Science.gov (United States)

    Bouquet, F.; Bobroff, J.; Fuchs-Gallezot, M.; Maurines, L.

    2017-03-01

    We describe a project-based physics lab, which we proposed to third-year university students. These labs are based on new open-source low-cost equipment (Arduino microcontrollers and compatible sensors). Students are given complete autonomy: they develop their own experimental setup and study the physics topic of their choice. The goal of these projects is to let students to discover the reality of experimental physics. Technical specifications of the acquisition material and case studies are presented for practical implementation in other universities.

  13. 15 CFR 917.22 - National Projects funding.

    Science.gov (United States)

    2010-01-01

    ... Projects funding proposals will be expected to address: (1) The relevance of the proposed project to a... projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed... National Projects can be up to 100 percent of the total cost of the project involved. ...

  14. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 2, Supporting information

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 collars) over the entire life of the system, or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  15. Cost Analysis of Total Joint Arthroplasty Readmissions in a Bundled Payment Care Improvement Initiative.

    Science.gov (United States)

    Clair, Andrew J; Evangelista, Perry J; Lajam, Claudette M; Slover, James D; Bosco, Joseph A; Iorio, Richard

    2016-09-01

    The Bundled Payment for Care Improvement (BPCI) Initiative is a Centers for Medicare and Medicaid Services program designed to promote coordinated and efficient care. This study seeks to report costs of readmissions within a 90-day episode of care for BPCI Initiative patients receiving total knee arthroplasty (TKA) or total hip arthroplasty (THA). From January 2013 through December 2013, 1 urban, tertiary, academic orthopedic hospital admitted 664 patients undergoing either primary TKA or THA through the BPCI Initiative. All patients readmitted to our hospital or an outside hospital within 90-days from the index episode were identified. The diagnosis and cost for each readmission were analyzed. Eighty readmissions in 69 of 664 patients (10%) were identified within 90-days. There were 53 readmissions (45 patients) after THA and 27 readmissions (24 patients) after TKA. Surgical complications accounted for 54% of THA readmissions and 44% of TKA readmissions. These complications had an average cost of $36,038 (range, $6375-$60,137) for THA and $38,953 (range, $4790-$104,794) for TKA. Eliminating the TKA outlier of greater than $100,000 yields an average cost of $27,979. Medical complications of THA and TKA had an average cost of $22,775 (range, $5678-$82,940) for THA and $24,183 (range, $3306-$186,069) for TKA. Eliminating the TKA outlier of greater than $100,000 yields an average cost of $11,682. Hospital readmissions after THA and TKA are common and costly. Identifying the causes for readmission and assessing the cost will guide quality improvement efforts. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Dietz, Simon; Hepburn, Cameron

    2013-01-01

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  17. SECON - A tool for estimation of storage costs and storage project revenue

    International Nuclear Information System (INIS)

    Hall, O.

    1997-01-01

    The SECON model Storage ECONomics is useful for gas suppliers, storage operators, gas distributors and consumers when investigating new storage possibilities. SECON has been used within the Sydkraft group to compare cost for different types of storage and to identify the market niche for lined rock cavern (LRC) storage. In the model cost for the different storage types, salt caverns, LNG, and LRC can be compared. By using input according to market needs each storage type can be validated for a specific service e.g. peak shaving, seasonal storage or balancing. The project revenue can also be calculated. SECON includes three models for income calculation; US storage service, Trading and Avoided Supply Contract Costs. The income models calculates annual turnover, pay of time, net present value, internal rate of return and max. liquidity shortfall for the project. The SECON will facilitate sensitivity analysis both regarding cost for different services and different storage types and on the income side by using different scenarios. At the poster session SECON will be presented live and the delegates will have the opportunity to test the model. (au)

  18. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    Science.gov (United States)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  19. Linking the spare parts management with the total costs of ownership: An agenda for future research

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2016-12-01

    Full Text Available Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC. Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view. Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO. Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  20. Linking the spare parts management with the total costs of ownership: An agenda for future research

    International Nuclear Information System (INIS)

    Duran, O.; Roda, I.; Macchi, M.

    2016-01-01

    Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC). Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view). Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO). Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  1. Linking the spare parts management with the total costs of ownership: An agenda for future research

    Energy Technology Data Exchange (ETDEWEB)

    Duran, O.; Roda, I.; Macchi, M.

    2016-07-01

    Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC). Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view). Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO). Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  2. Managing costs at Ginna Station

    International Nuclear Information System (INIS)

    Mecredy, R.C.

    1990-01-01

    A nuclear power plant with a capital cost of $88 million and an annual operations and maintenance (O and M) cost of $3.2 million that is operated by a plant staff of 59 people? The Ginna nuclear power plant was indeed such a plant in 1970, its first full year of operation. Today that same plant has a total invested capital cost of $400 million with an annual capital cost, including upgrade projects which are being amortized, of $37 million. The annual O and M expenditure is nearly $60 million, and the total staffing, both plant and corporate support, is nearly 600 people. The result of this increased cost has been a dramatic narrowing of the cost margin between Ginna and coal units in the rochester Gas and Electric system. While increased expenditures have resulted in improved reliability and operability, and have increased the margins of safety, it is becoming necessary to implement cost monitoring and control measures so that each dollar spent provides maximum value. The factors which have contributed to the increased capital and O and M expenditures are well known. They include a broad range of safety, reliability, and operating projects and activities. Current upward pressures on cost include initiatives such as procurement control, procedure upgrades, configuration management, enhanced maintenance activities, and equipment replacements and upgrades

  3. Episode of Care Payments in Total Joint Arthroplasty and Cost Minimization Strategies.

    Science.gov (United States)

    Nwachukwu, Benedict U; O'Donnell, Evan; McLawhorn, Alexander S; Cross, Michael B

    2016-02-01

    Total joint arthroplasty (TJA) is receiving significant attention in the US health care system for cost containment strategies. Specifically, payer organizations have embraced and are implementing bundled payment schemes in TJA. Consequently, hospitals and providers involved in the TJA care cycle have sought to adapt to the new financial pressures imposed by episode of care payment models by analyzing what components of the total "event" of a TJA are most essential to achieve a good outcome after TJA. As part of this review, we analyze and discuss a health economic study by Snow et al. As part of their study, the authors aimed to understand the association between preoperative physical therapy (PT) and post-acute care resource utilization, and its effect on the total cost of care during total joint arthroplasty. The purpose of this current review therefore is to (1) describe and analyze the findings presented by Snow et al. and (2) provide a framework for analyzing and critiquing economic analyses in orthopedic surgery. The study under review, while having important strengths, has several notable limitations that are important to keep in mind when making policy and coverage decisions. We support cautious interpretation and application of study results, and we encourage maintained attention to economic analysis in orthopedics as well as continued care path redesign to maximize value for patients and health care providers.

  4. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  5. Development of a Micro-Fabricated Total-Field Magnetometer

    Science.gov (United States)

    2011-03-01

    are made with fluxgate technologies. Fluxgates have lower sensitivity than Cs magnetometers , yet they continue to be used in small wands simply...extraction process by providing the sensitivity of a Cs magnetometer with the convenience and low cost of a fluxgate wand. Extremely small and low cost...FINAL REPORT Development of a Micro-Fabricated Total-Field Magnetometer SERDP Project MR-1512 MARCH 2011 Mark Prouty Geometrics, Inc

  6. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Science.gov (United States)

    2010-04-01

    ... breakdown of all project costs and that each cost element making up the project be reviewed for... either a firm commitment of its funds or a decision not to participate in the project; and B. Equity... his/her motivation remains high to pursue the business with vigor. The amount, type and terms of the...

  7. Clinical and cost effectiveness-related aspects of retransfusion in total hip and knee arthroplasty.

    Science.gov (United States)

    Dobosz, Bartłomiej; Dutka, Julian; Dutka, Lukasz; Maleta, Paweł

    2012-01-01

    An increasing demand for blood products forces the rationalisation of management and conservation of blood. The aim of the study is to evaluate the possibility of retransfusion of blood conservation and the cost-effectiveness of this procedure when employed in Total Hip Replacement and Total Knee Arthroplasty. This prospective cohort study involved two groups of patients. Group I comprised 50 patients who underwent blood retransfusion and in several cases had supplementary allogeneic transfusion. Group II, a control group, consisted of 50 patients who did not receive retransfusion. The retransfusion in Group I enabled the recovery of a mean amount of 364.5 ml (± 52.7) of blood in THR patients and 403.8 ml (± 110.7) in TKA patients. Demand for allogeneic blood transfusions in Group I versus Group II was 46% lower in THR patients and 42% lower in TKA patients. The blood recovered for retransfusion is biologically valuable with regard to cellular elements and plasma chemistries. In the costs evaluation, the total savings in Group I were 5,000 PLN. Retransfusion of recuperated blood from postoperative drainage tubing is a simple and safe method that provides clinical and cost-effectiveness advantages.

  8. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  9. Reducing Operating Room Costs Through Real-Time Cost Information Feedback: A Pilot Study.

    Science.gov (United States)

    Tabib, Christian H; Bahler, Clinton D; Hardacker, Thomas J; Ball, Kevin M; Sundaram, Chandru P

    2015-08-01

    To create a protocol for providing real-time operating room (OR) cost feedback to surgeons. We hypothesize that this protocol will reduce costs in a responsible way without sacrificing quality of care. All OR costs were obtained and recorded for robot-assisted partial nephrectomy and laparoscopic donor nephrectomy. Before the beginning of this project, costs pertaining to the 20 most recent cases were analyzed. Items were identified from previous cases as modifiable for replacement or omission. Timely feedback of total OR costs and cost of each item used was provided to the surgeon after each case, and costs were analyzed. A cost analysis of the robot-assisted partial nephrectomy before the washout period indicates expenditures of $5243.04 per case. Ten recommended modifiable items were found to have an average per case cost of $1229.33 representing 23.4% of the total cost. A postwashout period cost analysis found the total OR cost decreased by $899.67 (17.2%) because of changes directly related to the modifiable items. Therefore, 73.2% of the possible identified savings was realized. The same stepwise approach was applied to laparoscopic donor nephrectomies. The average total cost per case before the washout period was $3530.05 with $457.54 attributed to modifiable items. After the washout period, modifiable items costs were reduced by $289.73 (8.0%). No complications occurred in the donor nephrectomy cases while one postoperative complication occurred in the partial nephrectomy group. Providing surgeons with feedback related to OR costs may lead to a change in surgeon behavior and decreased overall costs. Further studies are needed to show equivalence in patient outcomes.

  10. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  11. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  12. Environmental Parametric Cost Model in Oil and Gas EPC Contracts

    Directory of Open Access Journals (Sweden)

    Madjid Abbaspour

    2018-01-01

    Full Text Available This study aims at identifying the parameters that govern the environmental costs in oil and gas projects. An initial conceptual model was proposed. Next, the costs of environmental management work packages were estimated, separately and were applied in project control tools (WBS/CBS. Then, an environmental parametric cost model was designed to determine the environmental costs and relevant weighting factors. The suggested model can be considered as an innovative approach to designate the environmental indicators in oil and gas projects. The validity of variables was investigated based on Delphi method. The results indicated that the project environmental management’s weighting factor is 0.87% of total project’s weighting factor.

  13. Estimating the cost to U.S. health departments to conduct HIV surveillance.

    Science.gov (United States)

    Shrestha, Ram K; Sansom, Stephanie L; Laffoon, Benjamin T; Farnham, Paul G; Shouse, R Luke; MacMaster, Karen; Hall, H Irene

    2014-01-01

    HIV case surveillance is a primary source of information for monitoring HIV burden in the United States and guiding the allocation of prevention and treatment funds. While the number of people living with HIV and the need for surveillance data have increased, little is known about the cost of surveillance. We estimated the economic cost to health departments of conducting high-quality HIV case surveillance. We collected primary data on the unit cost and quantity of resources used to operate the HIV case surveillance program in Michigan, where HIV burden (i.e., the number of HIV cases) is moderate to high (n=14,864 cases). Based on Michigan's data, we projected the expected annual HIV surveillance cost for U.S., state, local, and territorial health departments. We based our cost projection on the variation in the number of new and established cases, area-specific wages, and potential economies of scale. We estimated the annual total HIV surveillance cost to the Michigan health department to be $1,286,524 ($87/case), the annual total cost of new cases to be $108,657 ($133/case), and the annual total cost of established cases to be $1,177,867 ($84/case). Our projected median annual HIV surveillance cost per health department ranged from $210,600 in low-HIV burden sites to $1,835,000 in high-HIV burden sites. Our analysis shows that a systematic approach to costing HIV surveillance at the health department level is feasible. For HIV surveillance, a substantial portion of total surveillance costs is attributable to maintaining established cases.

  14. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  15. Use of predefined biochemical admission profiles does not reduce the number of tests or total cost

    DEFF Research Database (Denmark)

    Pareek, Manan; Haidl, Felix; Folkestad, Lars

    2014-01-01

    The objective of this pilot study was to evaluate whether the use of predefined biochemical profiles as an alternative to individually ordered blood tests by the treating physicians resulted in fewer tests or a lower total cost.......The objective of this pilot study was to evaluate whether the use of predefined biochemical profiles as an alternative to individually ordered blood tests by the treating physicians resulted in fewer tests or a lower total cost....

  16. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  17. The Relationship between Cost Leadership Strategy, Total Quality Management Applications and Financial Performance

    OpenAIRE

    Ali KURT; Cemal ZEHİR

    2016-01-01

    Firms need to implement some competition strategies and total quality management applications to overcome the fierce competition among others. The purpose of this study is to show the relationship between cost leadership strategy, total quality management applications and firms’ financial performance with literature review and empirical analysis. 449 questionnaires were conducted to the managers of 142 big firms. The data gathered was assessed with AMOS. As a result, the relationship between ...

  18. 23 CFR 650.703 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...

  19. Cost Assessment Methodology and Economic Viability of Tidal Energy Projects

    Directory of Open Access Journals (Sweden)

    Eva Segura

    2017-11-01

    Full Text Available The exploitation of technologies with which to harness the energy from ocean currents will have considerable possibilities in the future thanks to their enormous potential for electricity production and their high predictability. In this respect, the development of methodologies for the economic viability of these technologies is fundamental to the attainment of a consistent quantification of their costs and the discovery of their economic viability, while simultaneously attracting investment in these technologies. This paper presents a methodology with which to determine the economic viability of tidal energy projects, which includes a technical study of the life-cycle costs into which the development of a tidal farm can be decomposed: concept and definition, design and development, manufacturing, installation, operation and maintenance and dismantling. These cost structures are additionally subdivided by considering their sub-costs and bearing in mind the main components of the tidal farm: the nacelle, the supporting tidal energy converter structure and the export power system. Furthermore, a technical study is developed in order to obtain an estimation of the annual energy produced (and, consequently, the incomes generated if the electric tariff is known by considering its principal attributes: the characteristics of the current, the ability of the device to capture energy and its ability to convert and export the energy. The methodology has been applied (together with a sensibility analysis to the particular case of a farm composed of first generation tidal energy converters in one of the Channel Island Races, the Alderney Race, in the U.K., and the results have been attained by means of the computation of engineering indexes, such as the net present value, the internal rate of return, the discounted payback period and the levelized cost of energy, which indicate that the proposed project is economically viable for all the case studies.

  20. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  1. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  2. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  3. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  4. Direct medical costs of hospitalizations for cardiovascular diseases in Shanghai, China: trends and projections.

    Science.gov (United States)

    Wang, Shengnan; Petzold, Max; Cao, Junshan; Zhang, Yue; Wang, Weibing

    2015-05-01

    Few studies in China have focused on direct expenditures for cardiovascular diseases (CVDs), making cost trends for CVDs uncertain. Epidemic modeling and forecasting may be essential for health workers and policy makers to reduce the cost burden of CVDs.To develop a time series model using Box-Jenkins methodology for a 15-year forecasting of CVD hospitalization costs in Shanghai.Daily visits and medical expenditures for CVD hospitalizations between January 1, 2008 and December 31, 2012 were analyzed. Data from 2012 were used for further analyses, including yearly total health expenditures and expenditures per visit for each disease, as well as per-visit-per-year medical costs of each service for CVD hospitalizations. Time series analyses were performed to determine the long-time trend of total direct medical expenditures for CVDs and specific expenditures for each disease, which were used to forecast expenditures until December 31, 2030.From 2008 to 2012, there were increased yearly trends for both hospitalizations (from 250,354 to 322,676) and total costs (from US $ 388.52 to 721.58 million per year in 2014 currency) in Shanghai. Cost per CVD hospitalization in 2012 averaged US $ 2236.29, with the highest being for chronic rheumatic heart diseases (US $ 4710.78). Most direct medical costs were spent on medication. By the end of 2030, the average cost per visit per month for all CVDs was estimated to be US $ 4042.68 (95% CI: US $ 3795.04-4290.31) for all CVDs, and the total health expenditure for CVDs would reach over US $1.12 billion (95% CI: US $ 1.05-1.19 billion) without additional government interventions.Total health expenditures for CVDs in Shanghai are estimated to be higher in the future. These results should be a valuable future resource for both researchers on the economic effects of CVDs and for policy makers.

  5. Electrochromic Windows: Process and Fabrication Improvements for Lower Total Costs

    Energy Technology Data Exchange (ETDEWEB)

    Mark Burdis; Neil Sbar

    2007-03-31

    The overall goal with respect to the U.S. Department of Energy (DOE) is to achieve significant national energy savings through maximized penetration of EC windows into existing markets so that the largest cumulative energy reduction can be realized. The speed with which EC windows can be introduced and replace current IGU's (and current glazings) is clearly a strong function of cost. Therefore, the aim of this project was to investigate possible improvements to the SageGlass{reg_sign} EC glazing products to facilitate both process and fabrication improvements resulting in lower overall costs. The project was split into four major areas dealing with improvements to the electrochromic layer, the capping layer, defect elimination and general product improvements. Significant advancements have been made in each of the four areas. These can be summarized as follows: (1) Plasma assisted deposition for the electrochromic layer was pursued, and several improvements made to the technology for producing a plasma beam were made. Functional EC devices were produced using the new technology, but there are still questions to be answered regarding the intrinsic properties of the electrochromic films produced by this method. (2) The capping layer work was successfully implemented into the existing SageGlass{reg_sign} product, thereby providing a higher level of transparency and somewhat lower reflectivity than the 'standard' product. (3) Defect elimination is an ongoing effort, but this project spurred some major defect reduction programs, which led to significant improvements in yield, with all the implicit benefits afforded. In particular, major advances were made in the development of a new bus bar application process aimed at reducing the numbers of 'shorts' developed in the finished product, as well as making dramatic improvements in the methods used for tempering the glass, which had previously been seen to produce a defect which appeared as a

  6. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  7. Natural gas purchasing for cogeneration projects

    International Nuclear Information System (INIS)

    Kubacki, J. Jr.

    1992-01-01

    This paper reports on the primary cost component for most gas-fired cogeneration or on-site power projects, cost of natural gas. Often gas comprises 50 to 65% of total project costs over the life of the project. Thus it is very important to focus on natural gas sourcing, pricing, transportation and storage. This important task should not be blindly delegated to a gas supplier. The end user must develop a gas strategy that results in the most cost-effective burnertip price. Long-term natural gas supplies are usually source from the three major producing regions: Mod-Continent, Gulf Coast, and Western Canada. A well-reasoned gas strategy must include: determination of transportation and distribution options from the project site to potential gas sources (including direct interconnection of the project to interstate pipelines); acquisition of competitive gas bids from suppliers in appropriate regions; negotiation of potential discounts from interstate pipelines and local distribution companies (LDCs); fine-tuning project economics by, for example, using storage to maximize transportation load factor; and pricing mechanisms that meet economic parameters of the project. This paper uses a hypothetical project in the Midwest to examine the major factors in devising a cost-effective natural gas sourcing

  8. Time-driven Activity-based Cost of Fast-Track Total Hip and Knee Arthroplasty

    DEFF Research Database (Denmark)

    Andreasen, Signe E; Holm, Henriette B; Jørgensen, Mira

    2017-01-01

    this between 2 departments with different logistical set-ups. METHODS: Prospective data collection was analyzed using the time-driven activity-based costing method (TDABC) on time consumed by different staff members involved in patient treatment in the perioperative period of fast-track THA and TKA in 2 Danish...... orthopedic departments with standardized fast-track settings, but different logistical set-ups. RESULTS: Length of stay was median 2 days in both departments. TDABC revealed minor differences in the perioperative settings between departments, but the total cost excluding the prosthesis was similar at USD......-track methodology, the result could be a more cost-effective pathway altogether. As THA and TKA are potentially costly procedures and the numbers are increasing in an economical limited environment, the aim of this study is to present baseline detailed economical calculations of fast-track THA and TKA and compare...

  9. Parametric cost models for space telescopes

    Science.gov (United States)

    Stahl, H. Philip; Henrichs, Todd; Dollinger, Courtnay

    2017-11-01

    Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

  10. Parametric Cost Models for Space Telescopes

    Science.gov (United States)

    Stahl, H. Philip; Henrichs, Todd; Dollinger, Courtney

    2010-01-01

    Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

  11. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  12. A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.

    2007-01-01

    We present a reactor-by-reactor analysis of historical busbar costs for 99 nuclear reactors in the United States, and compare those costs with recent projections for next-generation US reactors. We argue that cost projections far different from median historical costs require more justification than estimates that lie close to those medians. Our analysis suggests that some recent projections of capital costs, construction duration, and total operations and maintenance costs are quite low-far enough from the historical medians that additional scrutiny may be required to justify using such estimates in current policy discussions and planning

  13. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  14. Total staff costs to implement a decision support system in nursing

    Directory of Open Access Journals (Sweden)

    Valéria Castilho

    2014-01-01

    Full Text Available OBJECTIVE: to identify the direct labor (DL costs to put in practice a decision support system (DSS in nursing at the University Hospital of the University of São Paulo (HU-USP. METHOD: the development of the DSS was mapped in four sub-processes: Conception, Elaboration, Construction and Transition. To calculate the DL, the baseline salary per professional category was added to the five-year additional remuneration, representation fees and social charges, and then divided by the number of hours contracted, resulting in the hour wage/professional, which was multiplied by the time spend on each activity in the sub-processes. RESULTS: the DL cost corresponded to R$ 752,618.56 (100%, R$ 26,000.00 (3.45% of which were funded by a funding agency, while R$ 726,618.56 (96,55% came from Hospital and University resources. CONCLUSION: considering the total DL cost, 72.1% related to staff wages for the informatics consulting company and 27.9% to the DL of professionals at the HU and the School of Nursing.

  15. A conceptual framework for the evaluation of cost-effectiveness of projects to reduce GHG emissions and sequester carbon

    International Nuclear Information System (INIS)

    Sathaye, J.; Norgaard, R.; Makundi, W.

    1993-07-01

    This paper proposes a conceptual framework for evaluating the cost of projects to reduce atmospheric greenhouse gases (GHGs). The evaluation of cost-effectiveness should account for both the timing of carbon emissions and the damage caused by the atmospheric stock of carbon. We develop a conceptual basis to estimate the cost-effectiveness of projects in terms of the cost of reducing atmospheric carbon (CRAC) and other GHGs. CRAC accounts for the economic discount rate, alternative functional forms of the shadow price, the residence period of carbon in the atmosphere, and the multiple monetary benefits of projects. The last item is of particular importance to the developing countries

  16. Frequent Change Request From User to Handle Cost on Project in Agile Model

    Directory of Open Access Journals (Sweden)

    Shariq Aziz Butt

    2017-05-01

    Full Text Available Agile has invented to improve and overcome Draw backs of software development. Now agile model is using in software development very vastly. It is facilitating the developer and client both very resourcefully. It is getting popularity than the other Software Development Life Cycle models because of its characteristics and most owing to allow change request at any level of the project. The client in the software development is the main part and asset of the company. The software house always focuses on its client because client is an asset. Thus developer has major concern with the client’s requirement and change request. Agile is getting popularity because of allow change request at any stage of project, on the other hand it is also a drawback in agile model because when project starts the project’s completion time and cost is decided. But due to frequent change of requests come from client the cost and completion time both increase eventually which is not good for software house’s business and reputation. So there is need a cost and time estimation technique to solve change request issue in agile model.

  17. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  18. Cost-benefit of the telecardiology service in the state of Minas Gerais: Minas Telecardio Project.

    Science.gov (United States)

    Andrade, Mônica Viegas; Maia, Ana Carolina; Cardoso, Clareci Silva; Alkmim, Maria Beatriz; Ribeiro, Antônio Luiz Pinho

    2011-10-01

    Telecardiology is a tool that can aid in cardiovascular care, mainly in towns located in remote areas. However, economic assessments on this subject are scarce and have yielded controversial results. To evaluate the cost-benefit of implementing a Telecardiology service in remote, small towns in the state of Minas Gerais, Brazil. The study used the database from the Minas Telecardio (MTC) Project, developed from June 2006 to November 2008, in 82 towns in the countryside of the state. Each municipality received a microcomputer with a digital electrocardiograph, with the possibility of transmitting ECG tracings and communicating with the on-duty cardiologist at the University hospital. The cost-benefit analysis was carried out by comparing the cost of performing an ECG in the project versus the cost of performing it by patient referral to another city. The average cost of an ECG in the MTC project was R$ 28.92, decomposed into R$ 8.08 for the cost of implementation and R$ 20.84 for maintenance. The cost simulation of the ECG with referral ranged from R$ 30.91 to R$ 54.58, with the cost-benefit ratio being always favorable to the MTC program, regardless of the type of calculation used for referral distance. The simulations considered the financial sponsor's and society's points-of-view. The sensitivity analysis with variation of calibration parameters confirmed these results. The implementation of a Telecardiology system as support to primary care in small Brazilian towns is feasible and economically beneficial, and can be used as a regular program within the Brazilian public health system.

  19. Hong Kong's health spending projections through 2033.

    Science.gov (United States)

    Leung, Gabriel M; Tin, Keith Y K; Chan, Wai-Sum

    2007-04-01

    To derive actuarial projection estimates of Hong Kong's total domestic health expenditure to the year 2033. Disaggregating health expenditure by age, sex, unit cost and utilisation level, we estimated future health spending by projecting utilisation (by public/private, inpatient/outpatient care) to reflect demographic changes and associated increase in demand (from higher expectations and greater intensity of care), and then multiplying such by the projected unit costs (incorporating the impact of key cost drivers such as public expectations, technological changes and potential productivity gains) to obtain total expenditure estimates. The model was most sensitive to the excess health care price inflation rate, i.e. the annual price/cost growth of medical goods and services over and above per capita GDP growth. Population ageing and growth per se, without taking into account related technologic innovation for chronic conditions that particularly afflict older adults, contribute relatively little to overall spending growth. Given the model assumptions, it is possible to limit total health spending to below 10% of GDP by 2033, where the public share would gradually decline from the current 57% to between 46% and 49%. Expenditure control through global budgeting, technology assessment and demand-side constraints should be considered although their effectiveness remains inconclusive.

  20. Project to support formation of an energy and environment technology demonstration project in fiscal 1999. International joint demonstration and research project (Sichuan Province natural gas DME project); 1999 nendo Shisensho tennen gas DME project seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    DME can be manufactured from such raw materials as natural gas, coal bed gas and coal. NKK who is developing a technology to synthesize efficiently the DME being a new energy has been commissioned from NEDO to investigate and study a project to manufacture DME using natural gas produced in Sinchuan Province, and utilize it as fuel for power generation, transportation and LPG substitution. In the present research, the DME manufacturing plant size was assumed to be 500 tons a day (165 x 10{sup 3} tons annually). This output nearly corresponds to the current LPG consumption. The required amount of natural gas as the raw material is 0.2 x 10{sup 9} Nm{sup 3}/year, wherein, since the total production quantity of natural gas in Sinchuan Province is 10 x 10{sup 9} Nm{sup 3}/year, there is no problem in the supply of natural gas as the raw material. The construction cost was estimated to be 11 billion yen taking into consideration the device fabrication cost and construction labor cost in China. Furthermore, as a result of discussing the economy considering the natural gas material cost, industrial water cost, and labor cost for plant operation, the internal profit rate for the total capital after tax was found a little over 10%, proving the project to have excellent economic performance. (NEDO)

  1. Quality Indicators for the Total Testing Process.

    Science.gov (United States)

    Plebani, Mario; Sciacovelli, Laura; Aita, Ada

    2017-03-01

    ISO 15189:2012 requires the use of quality indicators (QIs) to monitor and evaluate all steps of the total testing process, but several difficulties dissuade laboratories from effective and continuous use of QIs in routine practice. An International Federation of Clinical Chemistry and Laboratory Medicine working group addressed this problem and implemented a project to develop a model of QIs to be used in clinical laboratories worldwide to monitor and evaluate all steps of the total testing process, and decrease error rates and improve patient services in laboratory testing. All laboratories are invited, at no cost, to enroll in the project and contribute to harmonized management at the international level. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. How many Enrons? Mark-ups in the stated capital cost of independent power producers' (IPPs') power projects in developing countries

    International Nuclear Information System (INIS)

    Phadke, Amol

    2009-01-01

    I analyze the determinants of the stated capital cost of IPPs' power projects which significantly influences their price of power. I show that IPPs face a strong incentive to overstate their capital cost and argue that effective competition or regulatory scrutiny will limit the extent of the same. I analyze the stated capital costs of combined cycle gas turbine (CCGT) IPP projects in eight developing countries which became operational during 1990-2006 and find that the stated capital cost of projects selected without competitive bidding is 44-56% higher than those selected with competitive bidding, even after controlling for the effect of cost differences among projects. The extent to which the stated capital costs of projects selected without competitive bidding are higher compared those selected with competitive bidding, is a lower bound on the extent to which they are overstated. My results indicate the drawbacks associated with a policy of promoting private sector participation without an adequate focus on improving competition or regulation. (author)

  3. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  4. Bottom-up comparisons of CO2 storage and costs in forestry and biomass energy projects

    International Nuclear Information System (INIS)

    Swisher, J.N.

    1993-01-01

    In order to include forestry and biomass energy projects in a possible CO 2 emission reduction regime, and to compare the costs of individual projects or national programs, it is necessary to determine the rate of equivalency between carbon in fossil fuel emissions and carbon stored in different types of forestry, biomass and renewable energy projects. This paper presents a comprehensive and consistent methodology to account for the costs and carbon flows of different categories of forestry and biomass energy projects and describes the application of the methodology to several sets of projects in Latin America. The results suggest that both biomass energy development and forestry measures including reforestation and forest protection can contribute significantly to the reduction of global CO 2 emissions, and that local land-use capacity must determine the type of project that is appropriate in specific cases. No single approach alone is sufficient as either a national or global strategy for sustainable land use or carbon emission reduction

  5. Update on Multi-Variable Parametric Cost Models for Ground and Space Telescopes

    Science.gov (United States)

    Stahl, H. Philip; Henrichs, Todd; Luedtke, Alexander; West, Miranda

    2012-01-01

    Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper reports on recent revisions and improvements to our ground telescope cost model and refinements of our understanding of space telescope cost models. One interesting observation is that while space telescopes are 50X to 100X more expensive than ground telescopes, their respective scaling relationships are similar. Another interesting speculation is that the role of technology development may be different between ground and space telescopes. For ground telescopes, the data indicates that technology development tends to reduce cost by approximately 50% every 20 years. But for space telescopes, there appears to be no such cost reduction because we do not tend to re-fly similar systems. Thus, instead of reducing cost, 20 years of technology development may be required to enable a doubling of space telescope capability. Other findings include: mass should not be used to estimate cost; spacecraft and science instrument costs account for approximately 50% of total mission cost; and, integration and testing accounts for only about 10% of total mission cost.

  6. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  7. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  8. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  9. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  10. Alternate bidding strategies for asphalt and concrete pavement projects utilizing life cycle cost analysis (LCCA).

    Science.gov (United States)

    2012-07-01

    Recent changes in pavement materials costs have impacted the competitive environment relative to the : determination of the most cost effective pavement structure for a specific highway project. In response, State : highway agencies have renewed thei...

  11. Is total pancreatectomy as feasible, safe, efficacious, and cost-effective as pancreaticoduodenectomy? A single center, prospective, observational study.

    Science.gov (United States)

    Casadei, Riccardo; Ricci, Claudio; Taffurelli, Giovanni; Guariniello, Anna; Di Gioia, Anthony; Di Marco, Mariacristina; Pagano, Nico; Serra, Carla; Calculli, Lucia; Santini, Donatella; Minni, Francesco

    2016-09-01

    Total pancreatectomy is actually considered a viable option in selected patients even if large comparative studies between partial versus total pancreatectomy are not currently available. Our aim was to evaluate whether total pancreatectomy can be considered as feasible, safe, efficacious, and cost-effective as pancreaticoduodenectomy. A single center, prospective, observational trial, regarding postoperative outcomes, long-term results, and cost-effectiveness, in a tertiary referral center was conducted, comparing consecutive patients who underwent elective total pancreatectomy and/or pancreaticoduodenectomy. Seventy-three consecutive elective total pancreatectomies and 184 pancreaticoduodenectomies were compared. There were no significant differences regarding postoperative outcomes and overall survival. The quality of life, evaluated in 119 patients according to the EQ-5D-5L questionnaire, showed that there were no significant differences regarding the five items considered. The mean EQ-5D-5L score was similar in the two procedures (total pancreatectomy = 0.872, range 0.345-1.000; pancreaticoduodenectomy = 0.832, range 0.393-1.000; P = 0.320). The impact of diabetes according to the Problem Areas in Diabetes (PAID) questionnaire did not show any significant differences except for question 13 (total pancreatectomy = 0.60; pancreaticoduodenectomy = 0.19; P = 0.022). The cost-effectiveness analysis suggested that the quality-adjusted life year was not significantly different between the two procedures (total pancreatectomy = 0.910, range 0.345-1.000; pancreaticoduodenectomy = 0.910, range -0.393-1.000; P = 0.320). From this study, it seems reasonable to suggest that total pancreatectomy can be considered as safe, feasible, and efficacious as PD and acceptable in terms of cost-effectiveness.

  12. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  13. Projected hydrogen cost from methane reforming for North America 2015-2050

    International Nuclear Information System (INIS)

    Vanderveen, K.; Lutz, A.; Klebanoff, L.; Drennen, T.; Keller, J.; Drennen, T.; Kamery, W.

    2006-01-01

    The Hydrogen Futures Simulation Model (H 2 Sim) was used to project the cost for hydrogen at the point of sale to light duty vehicles for distributed, small-scale steam methane reforming. Projections cover the period from 2010-2050 in North America, and take into account assumptions about the quantity of recoverable natural gas remaining in North America. We conclude that there is a window for distributed reforming to play a positive role in supplying a H 2 fuel infrastructure, but this window is closing rapidly. The analysis assumes that production from natural gas reserves in North America will peak sometime before 2050 and demand will cause the price to rise after the peak of production in a manner consistent with Hotelling's model. We consider three scenarios for when the peak occurs, and evaluate the impact on the cost of hydrogen fuel produced via distributed small scale reforming in these three scenarios. (authors)

  14. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  15. A Second Opinion is Worth the Cost - 12479

    Energy Technology Data Exchange (ETDEWEB)

    Madsen, Drew [Project Time and Cost Inc. (United States)

    2012-07-01

    This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil

  16. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  17. The cost and feasibility of marine coastal restoration.

    Science.gov (United States)

    Bayraktarov, Elisa; Saunders, Megan I; Abdullah, Sabah; Mills, Morena; Beher, Jutta; Possingham, Hugh P; Mumby, Peter J; Lovelock, Catherine E

    2016-06-01

    Land-use change in the coastal zone has led to worldwide degradation of marine coastal ecosystems and a loss of the goods and services they provide. Restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed and is critical for habitats where natural recovery is hindered. Uncertainties about restoration cost and feasibility can impede decisions on whether, what, how, where, and how much to restore. Here, we perform a synthesis of 235 studies with 954 observations from restoration or rehabilitation projects of coral reefs, seagrass, mangroves, salt-marshes, and oyster reefs worldwide, and evaluate cost, survival of restored organisms, project duration, area, and techniques applied. Findings showed that while the median and average reported costs for restoration of one hectare of marine coastal habitat were around US$80000 (2010) and US$1600000 (2010), respectively, the real total costs (median) are likely to be two to four times higher. Coral reefs and seagrass were among the most expensive ecosystems to restore. Mangrove restoration projects were typically the largest and the least expensive per hectare. Most marine coastal restoration projects were conducted in Australia, Europe, and USA, while total restoration costs were significantly (up to 30 times) cheaper in countries with developing economies. Community- or volunteer-based marine restoration projects usually have lower costs. Median survival of restored marine and coastal organisms, often assessed only within the first one to two years after restoration, was highest for saltmarshes (64.8%) and coral reefs (64.5%) and lowest for seagrass (38.0%). However, success rates reported in the scientific literature could be biased towards publishing successes rather than failures. The majority of restoration projects were short-lived and seldom reported monitoring costs. Restoration success depended primarily on the ecosystem, site selection, and techniques

  18. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  19. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  20. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Science.gov (United States)

    2010-01-01

    ... Agency's satisfaction before the application will be approved. The applicant must submit the original... to bioenergy projects, which are, as defined in § 4280.103, renewable energy systems that produce... requirements and obtaining those agreements. This is required even if the system is installed on the customer...

  1. Assessing energy projects from the viewpoint of individual economic branches and total economy. The role of economic efficiency analysis, cost-benefit analysis and multicriteria methods

    International Nuclear Information System (INIS)

    Sell, A.

    1992-01-01

    Energy is an extremely important good and means of production not only for the individual branches of economy but, due to its essential meaning to the development of a region or a national economy and its external effects connected with production and consumption, also of great interest to all economic branches. This article deals with the relation of analyses in individual economical branches and those in total economy and with the question of what the importance of cost-benefit analyses and other methods is in the analysis in total economy. The author also mentions the planning as in the special literature the planning and evaluation phases are not analytically separated which is seen especially in the discussion about the multi-criteria methods. (orig.) [de

  2. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  3. Determining the Cost-Savings Threshold and Alignment Accuracy of Patient-Specific Instrumentation in Total Ankle Replacements.

    Science.gov (United States)

    Hamid, Kamran S; Matson, Andrew P; Nwachukwu, Benedict U; Scott, Daniel J; Mather, Richard C; DeOrio, James K

    2017-01-01

    Traditional intraoperative referencing for total ankle replacements (TARs) involves multiple steps and fluoroscopic guidance to determine mechanical alignment. Recent adoption of patient-specific instrumentation (PSI) allows for referencing to be determined preoperatively, resulting in less steps and potentially decreased operative time. We hypothesized that usage of PSI would result in decreased operating room time that would offset the additional cost of PSI compared with standard referencing (SR). In addition, we aimed to compare postoperative radiographic alignment between PSI and SR. Between August 2014 and September 2015, 87 patients undergoing TAR were enrolled in a prospectively collected TAR database. Patients were divided into cohorts based on PSI vs SR, and operative times were reviewed. Radiographic alignment parameters were retrospectively measured at 6 weeks postoperatively. Time-driven activity-based costing (TDABC) was used to derive direct costs. Cost vs operative time-savings were examined via 2-way sensitivity analysis to determine cost-saving thresholds for PSI applicable to a range of institution types. Cost-saving thresholds defined the price of PSI below which PSI would be cost-saving. A total of 35 PSI and 52 SR cases were evaluated with no significant differences identified in patient characteristics. Operative time from incision to completion of casting in cases without adjunct procedures was 127 minutes with PSI and 161 minutes with SR ( P cost-savings threshold range at our institution of $863 below which PSI pricing would provide net cost-savings. Two-way sensitivity analysis generated a globally applicable cost-savings threshold model based on institution-specific costs and surgeon-specific time-savings. This study demonstrated equivalent postoperative TAR alignment with PSI and SR referencing systems but with a significant decrease in operative time with PSI. Based on TDABC and associated sensitivity analysis, a cost-savings threshold

  4. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  5. Cost-Effective Mobile-Based Healthcare System for Managing Total Joint Arthroplasty Follow-Up.

    Science.gov (United States)

    Bitsaki, Marina; Koutras, George; Heep, Hansjoerg; Koutras, Christos

    2017-01-01

    Long-term follow-up care after total joint arthroplasty is essential to evaluate hip and knee arthroplasty outcomes, to provide information to physicians and improve arthroplasty performance, and to improve patients' health condition. In this paper, we aim to improve the communication between arthroplasty patients and physicians and to reduce the cost of follow-up controls based on mobile application technologies and cloud computing. We propose a mobile-based healthcare system that provides cost-effective follow-up controls for primary arthroplasty patients through questions about symptoms in the replaced joint, questionnaires (WOMAC and SF-36v2) and the radiological examination of knee or hip joint. We also perform a cost analysis for a set of 423 patients that were treated in the University Clinic for Orthopedics in Essen-Werden. The estimation of healthcare costs shows significant cost savings (a reduction of 63.67% for readmission rate 5%) in both the University Clinic for Orthopedics in Essen-Werden and the state of North Rhine-Westphalia when the mobile-based healthcare system is applied. We propose a mHealth system to reduce the cost of follow-up assessments of arthroplasty patients through evaluation of diagnosis, self-monitoring, and regular review of their health status.

  6. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    NARCIS (Netherlands)

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by

  7. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program. Volume 1. The analysis and its results

    International Nuclear Information System (INIS)

    1986-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report provides cost estimates for the fourth evaluation of the adequacy of the fee. The total-system cost for the reference authorized-system program is estimated to be 24 to 32 billion (1985) dollars. The total-system cost for the reference improved-performance system is estimated to be 26 to 34 billion dollars. A number of sensitivity cases were analyzed. For the authorized system, the costs for the sensitivity cases studied range from 21 to 39 billion dollars. For the improved-performance system, which includes a facility for monitored retrievable storage, the total-system cost in the sensitivity cases is estimated to be as high as 41 billion dollars. The factors that affect costs more than any other single factor for both the authorized and the improved-performance systems are delays in repository startup. A preliminary analysis of the impact of extending the burnup of nuclear fuel in the reactor was also performed; its results indicate that the impact is insignificant: the total-system cost is essentially unchanged from the comparable constant-burnup cases. The current estimate of the the total-system cost for the reference authorized system is zero to 3 billion dollars (9%) higher than the estimate for the reference system in the January 1985 TSLCC analysis

  8. Preliminary estimate of the costs involved in the implantation of a low and medium level radioactive waste repository in Brazil

    International Nuclear Information System (INIS)

    Branco, Otavio E.A.; Carvalho Filho, Carlos A.; Ferreira, Vinicius V.M.; Alves, Paulo R.R.

    2009-01-01

    One relevant subject in the decision making process linked to the implantation of a low and intermediate level waste (LILW) repository in Brazil is regarding to the project expected costs. It is important to estimate in a solid way the total and partial costs expected, considering each one of the enterprise implantation phases. This work shows an initial estimative of these costs, based on reports and papers that evaluate the implantation, operation, closure and post closure costs of radioactive LILW waste repositories. In the development of this research only the costs regarding to near surface repositories, or similar ones, were considered. The total cost was estimated as approximately 115 million dollars, considering the whole project lifetime as 300 years. Considering the repository start-up costs (site selection, licensing, project and construction), the total value is estimated as 48 million dollars (1600 dollars/m 3 ). It is important to emphasize that some cares should be taken when costs obtained from the acquired experience by another countries in the repositories development are analyzed. As example, the costs for disposal 1 m 3 of low and medium level radioactive waste vary significantly from one country to another, even when repositories with similar projects are compared. Also the total costs of construction and licensing are significantly higher when compared those ones from 'conventional' facilities with similar technological characteristics. Finally, although about a dozen low and medium level radioactive waste repository are operating in Europe, new projects should be faced, as the international practice demonstrate, as original developments. (author)

  9. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  10. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  11. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  12. Cost-Effectiveness of Breast Cancer Screening in Turkey, a Developing Country: Results from Bahçeşehir Mammography Screening Project.

    Science.gov (United States)

    Özmen, Vahit; Gürdal, Sibel Ö; Cabioğlu, Neslihan; Özcinar, Beyza; Özaydın, A Nilüfer; Kayhan, Arda; Arıbal, Erkin; Sahin, Cennet; Saip, Pınar; Alagöz, Oğuzhan

    2017-07-01

    We used the results from the first three screening rounds of Bahcesehir Mammography Screening Project (BMSP), a 10-year (2009-2019) and the first organized population-based screening program implemented in a county of Istanbul, Turkey, to assess the potential cost-effectiveness of a population-based mammography screening program in Turkey. Two screening strategies were compared: BMSP (includes three biennial screens for women between 40-69) and Turkish National Breast Cancer Registry Program (TNBCRP) which includes no organized population-based screening. Costs were estimated using direct data from the BMSP project and the reimbursement rates of Turkish Social Security Administration. The life-years saved by BMSP were estimated using the stage distribution observed with BMSP and TNBCRP. A total of 67 women (out of 7234 screened women) were diagnosed with breast cancer in BMSP. The stage distribution for AJCC stages O, I, II, III, IV was 19.4%, 50.8%, 20.9%, 7.5%, 1.5% and 4.9%, 26.6%, 44.9%, 20.8%, 2.8% with BMSP and TNBCRP, respectively. The BMSP program is expected to save 279.46 life years over TNBCRP with an additional cost of $677.171, which implies an incremental cost-effectiveness ratio (ICER) of $2.423 per saved life year. Since the ICER is smaller than the Gross Demostic Product (GDP) per capita in Turkey ($10.515 in 2014), BMSP program is highly cost-effective and remains cost-effective in the sensitivity analysis. Mammography screening may change the stage distribution of breast cancer in Turkey. Furthermore, an organized population-based screening program may be cost-effective in Turkey and in other developing countries. More research is needed to better estimate life-years saved with screening and further validate the findings of our study.

  13. Effect of Body Mass Index and Psychosocial Traits on Total Knee Replacement Costs in Patients with Osteoarthritis.

    Science.gov (United States)

    Waimann, Christian A; Fernandez-Mazarambroz, Rodrigo J; Cantor, Scott B; Lopez-Olivo, Maria A; Barbo, Andrea G; Landon, Glenn C; Siff, Sherwin J; Lin, Heather; Suarez-Almazor, Maria E

    2016-08-01

    Clinical and psychosocial attributes are associated with clinical outcomes after total knee replacement (TKR) surgery in patients with osteoarthritis (OA), but their relationship with TKR-related costs is less clear. Our objective was to evaluate the effect of clinical and psychosocial attributes on TKR costs. We conducted a 6-month prospective cohort study of patients with knee OA who underwent TKR. We examined baseline demographic, clinical [body mass index (BMI) and comorbidities], and psychosocial attributes (social support, locus of control, coping, depression, anxiety, stress, and self-efficacy); baseline and 6-month OA clinical outcomes [Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC) pain and function]; and 6-month direct and indirect TKR-related costs. Multiple regression was performed to identify determinants of TKR-related costs. We included 212 patients; 66% were women, 71% were white, and the mean age was 65.2 years. The mean baseline WOMAC pain score was 55 (SD 19) and WOMAC function score was 54 (SD 20). Mean total TKR-related costs were US$30,831 (SD $9893). Multivariate regression analyses showed that increasing BMI and anxiety levels and decreasing levels of positive social interactions were associated with increased costs. A lower cost scenario with a lower range of normal BMI (19.5), highest positive social interaction, and no anxiety predicted TKR costs to be $22,247. Predicted costs in obese patients (BMI 36) with lowest positive social interaction and highest anxiety were $58,447. Increased baseline BMI, anxiety, and poor social support lead to higher TKR-related costs in patients with knee OA. Preoperative interventions targeting these factors may reduce TKR-related costs, and therefore be cost-effective.

  14. Opportunities for low-cost CO2 storage demonstration projects in China

    International Nuclear Information System (INIS)

    Meng, Kyle C.; Williams, Robert H.; Celia, Michael A.

    2007-01-01

    Several CO 2 storage demonstration projects are needed in a variety of geological formations worldwide to prove the viability of CO 2 capture and storage as a major option for climate change mitigation. China has several low-cost CO 2 sources at sites that produce NH 3 from coal via gasification. At these plants, CO 2 generated in excess of the amount needed for other purposes (e.g., urea synthesis) is vented as a relatively pure stream. These CO 2 sources would potentially be economically interesting candidates for storage demonstration projects if there are suitable storage sites nearby. In this study a survey was conducted to estimate CO 2 availability at modern Chinese coal-fed ammonia plants. Results indicate that annual quantities of available, relatively pure CO 2 per site range from 0.6 to 1.1 million tonnes. The CO 2 source assessment was complemented by analysis of possible nearby opportunities for CO 2 storage. CO 2 sources were mapped in relation to China's petroliferous sedimentary basins where prospective CO 2 storage reservoirs possibly exist. Four promising pairs of sources and sinks were identified. Project costs for storage in deep saline aquifers were estimated for each pairing ranging from $15-21/t of CO 2 . Potential enhanced oil recovery and enhanced coal bed methane recovery opportunities near each prospective source were also considered

  15. Cost comparison for REDC pretreatment project

    International Nuclear Information System (INIS)

    Robinson, S.M.; Homan, F.J.

    1997-06-01

    This analysis has been prepared to support the planned expenditure to provide the Radiochemical Engineering Development Center (REDC) with the capability to pretreat their liquid low-level waste (LLLW) before discharging it to the Oak Ridge National Laboratory (ORNL) LLLW system. Pretreatment will remove most of the radioactivity, particularly the transuranic isotopes and Cs-137 from the waste to be discharged. This will render the supernates that accumulate in the storage tanks low-activity Class B low-level wastes rather than high-activity Class B or Class C wastes. The sludges will be Class C rather than remote-handled transuranic (RH-TRU) wastes. When REDC wastes are commingled with other ORNL LLLW, the present-worth treatment and transport costs are higher by a factor of 1.3 for the no-pretreatment cases. This result is consistent with data from similar studies conducted at other sites. Based on the information presented in this analysis, the recommendation is to proceed with REDC treatment projects

  16. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 1, The analysis and its results

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 dollars) over the entire life of the system...or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  17. Cost-analysis of robotic-assisted laparoscopic hysterectomy versus total abdominal hysterectomy for women with endometrial cancer and atypical complex hyperplasia

    DEFF Research Database (Denmark)

    Herling, Suzanne Forsyth; Palle, Connie; Møller, Ann M.

    2016-01-01

    INTRODUCTION: The aim of this study was to analyse the hospital cost of treatment with robotic-assisted laparoscopic hysterectomy and total abdominal hysterectomy for women with endometrial cancer or atypical complex hyperplasia and to identify differences in resource use and cost. MATERIAL...... AND METHODS: This cost analysis was based on two cohorts: women treated with robotic-assisted laparoscopic hysterectomy (n = 202) or with total abdominal hysterectomy (n = 158) at Copenhagen University Hospital, Herlev, Denmark. We conducted an activity-based cost analysis including consumables and healthcare...... professionals' salaries. As cost-drivers we included severe complications, duration of surgery, anesthesia and stay at the post-anesthetic care unit, as well as number of hospital bed-days. Ordinary least-squares regression was used to explore the cost variation. The primary outcome was cost difference...

  18. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    Science.gov (United States)

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total

  19. The Current and Projected Taxpayer Shares of US Health Costs.

    Science.gov (United States)

    Himmelstein, David U; Woolhandler, Steffie

    2016-03-01

    We estimated taxpayers' current and projected share of US health expenditures, including government payments for public employees' health benefits as well as tax subsidies to private health spending. We tabulated official Centers for Medicare and Medicaid Services figures on direct government spending for health programs and public employees' health benefits for 2013, and projected figures through 2024. We calculated the value of tax subsidies for private spending from official federal budget documents and figures for state and local tax collections. Tax-funded health expenditures totaled $1.877 trillion in 2013 and are projected to increase to $3.642 trillion in 2024. Government's share of overall health spending was 64.3% of national health expenditures in 2013 and will rise to 67.1% in 2024. Government health expenditures in the United States account for a larger share of gross domestic product (11.2% in 2013) than do total health expenditures in any other nation. Contrary to public perceptions and official Centers for Medicare and Medicaid Services estimates, government funds most health care in the United States. Appreciation of government's predominant role in health funding might encourage more appropriate and equitable targeting of health expenditures.

  20. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  1. Cost-effectiveness of intensified versus conventional multifactorial intervention in type 2 diabetes: results and projections from the Steno-2 study

    DEFF Research Database (Denmark)

    Gaede, Peter; Valentine, William J; Palmer, Andrew J

    2008-01-01

    and account Danish-specific costs to project life expectancy, quality-adjusted life expectancy (QALE), and lifetime direct medical costs expressed in year 2005 Euros. Clinical and cost outcomes were projected over patient lifetimes and discounted at 3% annually. Sensitivity analyses were performed. RESULTS...... gained. This is considered a conservative estimate because accounting prescription of generic drugs and capturing indirect costs would further favor intensified therapy. CONCLUSIONS: From a health care payer perspective in Denmark, intensive therapy was more cost-effective than conventional treatment...

  2. Cost of post-operative intravenous iron therapy in total lower limb arthroplasty: a retrospective, matched cohort study

    Science.gov (United States)

    Muñoz, Manuel; Gómez-Ramírez, Susana; Martín-Montañez, Elisa; Naveira, Enrique; Seara, Javier; Pavía, José

    2014-01-01

    Background Requirements for allogeneic red cell transfusion after total lower limb arthroplasty are still high (20–50%), and post-operative intravenous iron has been shown to reduce transfusion requirements for this surgery. We performed a cost analysis to ascertain whether this alternative is also likely to be cost-effective. Materials and methods Data from 182 matched-pairs of total lower limb arthroplasty patients, managed with a restrictive transfusion protocol and without (control group) or with post-operative intravenous iron (iron group), were retrospectively reviewed. Acquisition and administration costs of iron (iron sucrose or ferric carboxymaltose) and allogeneic red cell concentrates, haemoglobin measurements, and prolonged stay in hospital were used for blood management cost analysis. Results Patients in the iron group received 600 mg intravenous iron, without clinically relevant incidents, and had a lower allogeneic transfusion rate (11.5% vs 26.4% for the iron and control groups, respectively; p=0.001). The reduction in transfusion rate was more pronounced in anaemic patients (17% vs 40%; p=0.015) than in non-anaemic ones (9.6% vs 21.2%; p=0.011). There were no differences with respect to post-operative infection rate. Patients receiving allogeneic transfusion stayed in hospital longer (+1.9 days [95% CI: 1.2–2.6]). As intravenous iron reduces the allogeneic transfusion rate, both iron formulations were cost-neutral in the different cost scenarios (−25.5 to 62.1 €/patient for iron sucrose, and −51.1 to 64.4 €/patient for ferric carboxymaltose). Discussion In patients presenting with or without pre-operative anaemia, post-operative intravenous iron after total lower limb arthroplasty seems to be safe and is associated with reduced transfusion rates, without incremental costs. For anaemic patients, its efficacy could be increased by associating some other blood-saving method. PMID:24120595

  3. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  4. Quantifying the total cost of infrastructure to enable environmentally preferable decisions: the case of urban roadway design

    Science.gov (United States)

    Gosse, Conrad A.; Clarens, Andres F.

    2013-03-01

    Efforts to reduce the environmental impacts of transportation infrastructure have generally overlooked many of the efficiencies that can be obtained by considering the relevant engineering and economic aspects as a system. Here, we present a framework for quantifying the burdens of ground transportation in urban settings that incorporates travel time, vehicle fuel and pavement maintenance costs. A Pareto set of bi-directional lane configurations for two-lane roadways yields non-dominated combinations of lane width, bicycle lanes and curb parking. Probabilistic analysis and microsimulation both show dramatic mobility reductions on road segments of insufficient width for heavy vehicles to pass bicycles without encroaching on oncoming traffic. This delay is positively correlated with uphill grades and increasing traffic volumes and inversely proportional to total pavement width. The response is nonlinear with grade and yields mixed uphill/downhill optimal lane configurations. Increasing bicycle mode share is negatively correlated with total costs and emissions for lane configurations allowing motor vehicles to safely pass bicycles, while the opposite is true for configurations that fail to facilitate passing. Spatial impacts on mobility also dictate that curb parking exhibits significant spatial opportunity costs related to the total cost Pareto curve. The proposed framework provides a means to evaluate relatively inexpensive lane reconfiguration options in response to changing modal share and priorities. These results provide quantitative evidence that efforts to reallocate limited pavement space to bicycles, like those being adopted in several US cities, could appreciably reduce costs for all users.

  5. Quantifying the total cost of infrastructure to enable environmentally preferable decisions: the case of urban roadway design

    International Nuclear Information System (INIS)

    Gosse, Conrad A; Clarens, Andres F

    2013-01-01

    Efforts to reduce the environmental impacts of transportation infrastructure have generally overlooked many of the efficiencies that can be obtained by considering the relevant engineering and economic aspects as a system. Here, we present a framework for quantifying the burdens of ground transportation in urban settings that incorporates travel time, vehicle fuel and pavement maintenance costs. A Pareto set of bi-directional lane configurations for two-lane roadways yields non-dominated combinations of lane width, bicycle lanes and curb parking. Probabilistic analysis and microsimulation both show dramatic mobility reductions on road segments of insufficient width for heavy vehicles to pass bicycles without encroaching on oncoming traffic. This delay is positively correlated with uphill grades and increasing traffic volumes and inversely proportional to total pavement width. The response is nonlinear with grade and yields mixed uphill/downhill optimal lane configurations. Increasing bicycle mode share is negatively correlated with total costs and emissions for lane configurations allowing motor vehicles to safely pass bicycles, while the opposite is true for configurations that fail to facilitate passing. Spatial impacts on mobility also dictate that curb parking exhibits significant spatial opportunity costs related to the total cost Pareto curve. The proposed framework provides a means to evaluate relatively inexpensive lane reconfiguration options in response to changing modal share and priorities. These results provide quantitative evidence that efforts to reallocate limited pavement space to bicycles, like those being adopted in several US cities, could appreciably reduce costs for all users. (letter)

  6. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  7. Economic cost of electricity sold to new aluminium smelters

    International Nuclear Information System (INIS)

    Belanger, G.; Bernard, J.T.

    2008-01-01

    Low cost electricity was a key factor for establishing an aluminium industry in Quebec. Smelters in the province use 50 terawatt hours of electricity per year, which represents 25 per cent of the total consumed in Quebec. This article assessed the profitability of new industrial projects that require large quantities of electricity at a time when the cost of new power plants is increasing. However, electricity is being sold below cost and the difference is subsidized by the government. The investment is justified by the government because these new projects create high paying jobs. The authors presented cases of 2 new aluminium plants, and concluded that they represented a very high economic cost for the province. 1 tab

  8. Eclipse Soundscapes Project: Making the August 21, 2017 Total Solar Eclipse Accessible to Everyone

    Science.gov (United States)

    Winter, H. D., III

    2017-12-01

    The Eclipse Soundscapes Project delivered a multisensory experience that allowed the blind and visually impaired to engage with the August 21, 2017 total solar eclipse along with their sighted peers in a way that would not have been possible otherwise. The project, from the Smithsonian Astrophysical Observatory and NASA's Heliophysics Education Consortium, includes illustrative audio descriptions of the eclipse in real time, recordings of the changing environmental sounds during the eclipse, and an interactive "rumble map" app that allows users to experience the eclipse through touch and sound. The Eclipse Soundscapes Project is working with organizations such as the National Parks Service (NPS), Science Friday, and Brigham Young University and by WGBH's National Center for Accessible Media (NCAM) to bring the awe and wonder of the total solar eclipse and other astronomical phenomena to a segment of the population that has been excluded from and astronomy and astrophysics for far too long, while engaging all learners in new and exciting ways.

  9. Guidelines for Acceptable Project Expenditures

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    You should indicate the total cost for ... achieving project objectives or the quality and effects of IDRC-funded activities. You can include ... travel-management processes to handle travel, but the class of travel and per diems must follow IDRC.

  10. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  11. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  12. An Analysis of Rocket Propulsion Testing Costs

    Science.gov (United States)

    Ramirez-Pagan, Carmen P.; Rahman, Shamim A.

    2009-01-01

    The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to

  13. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  14. The cost of solar refrigeration: The rococo project; Was solare Kuehlung kostet - das Rococo-Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, J.P.

    2008-01-21

    The cost of modern solar refrigerators is between 1,300 and 8,000 Euros per kW of refrigeration capacity. The biggest potential for savings is in the peripheral components, as well as in the operating cost and especially in servicing. Cost reduction must have priority if solar refrigeration is to be successful in the market. In the context of the European research project ''Reduction of costs of Solar Cooling systems'' (Rococo), a team of scientists from France, Spain and Austria investigated existing systems. (orig.)

  15. Analysis of extreme values of the economic efficiency indicators of transport infrastructure projects

    Science.gov (United States)

    Korytárová, J.; Vaňková, L.

    2017-10-01

    Paper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio - NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.

  16. Cost analysis of erythropoietin versus blood transfusions for cervical cancer patients receiving chemoradiotherapy

    International Nuclear Information System (INIS)

    Kavanagh, Brian D.; Fischer, Bernard A.; Segreti, Eileen M.; Wheelock, John B.; Boardman, Cecilia; Roseff, Susan D.; Cardinale, Robert M.; Benedict, Stanley H.; Goram, Adrian L.

    2001-01-01

    Purpose: Red blood cell (RBC) transfusions or erythropoietin (EPO) can be used to evade the detrimental effects of anemia during radiotherapy, but the economic consequences of selecting either intervention are not well defined. The RBC transfusion needs during chemoradiotherapy for cervix cancer were quantified to allow comparison of RBC transfusion costs with the projected cost of EPO in this setting. Methods and Materials: For patients receiving pelvic radiotherapy, weekly cisplatin, and brachytherapy, the RBC units transfused during treatment were tallied. RBC transfusion costs per unit included the blood itself, laboratory fees, and expected value (risk multiplied by cost) of transfusion-related viral illness. EPO costs included the drug itself and supplemental RBC transfusions when hemoglobin was not adequately maintained. An EPO dosage based on reported usage in cervix cancer patients was applied. Results: Transfusions were given for hemoglobin <10 g/dL. Among 12 consecutive patients, 10 needed at least 1 U of RBC before or during treatment, most commonly after the fifth week. A total of 37 U was given during treatment, for an average of 3.1 U/patient. The sum total of the projected average transfusion-related costs was $990, compared with the total projected EPO-related costs of $3869. Conclusions: Because no proven clinical advantage has been documented for EPO compared with RBC transfusions to maintain hemoglobin during cervix cancer treatment, for most patients, transfusions are an appropriate and appealingly less expensive option

  17. HIV prevention costs and program scale: data from the PANCEA project in five low and middle-income countries

    Directory of Open Access Journals (Sweden)

    Stanley Nicci

    2007-07-01

    Full Text Available Abstract Background Economic theory and limited empirical data suggest that costs per unit of HIV prevention program output (unit costs will initially decrease as small programs expand. Unit costs may then reach a nadir and start to increase if expansion continues beyond the economically optimal size. Information on the relationship between scale and unit costs is critical to project the cost of global HIV prevention efforts and to allocate prevention resources efficiently. Methods The "Prevent AIDS: Network for Cost-Effectiveness Analysis" (PANCEA project collected 2003 and 2004 cost and output data from 206 HIV prevention programs of six types in five countries. The association between scale and efficiency for each intervention type was examined for each country. Our team characterized the direction, shape, and strength of this association by fitting bivariate regression lines to scatter plots of output levels and unit costs. We chose the regression forms with the highest explanatory power (R2. Results Efficiency increased with scale, across all countries and interventions. This association varied within intervention and within country, in terms of the range in scale and efficiency, the best fitting regression form, and the slope of the regression. The fraction of variation in efficiency explained by scale ranged from 26% – 96%. Doubling in scale resulted in reductions in unit costs averaging 34.2% (ranging from 2.4% to 58.0%. Two regression trends, in India, suggested an inflection point beyond which unit costs increased. Conclusion Unit costs decrease with scale across a wide range of service types and volumes. These country and intervention-specific findings can inform projections of the global cost of scaling up HIV prevention efforts.

  18. Total direct cost, length of hospital stay, institutional discharges and their determinants from rehabilitation settings in stroke patients.

    Science.gov (United States)

    Saxena, S K; Ng, T P; Yong, D; Fong, N P; Gerald, K

    2006-11-01

    Length of hospital stay (LOHS) is the largest determinant of direct cost for stroke care. Institutional discharges (acute care and nursing homes) from rehabilitation settings add to the direct cost. It is important to identify potentially preventable medical and non-medical reasons determining LOHS and institutional discharges to reduce the direct cost of stroke care. The aim of the study was to ascertain the total direct cost, LOHS, frequency of institutional discharges and their determinants from rehabilitation settings. Observational study was conducted on 200 stroke patients in two rehabilitation settings. The patients were examined for various socio-demographic, neurological and clinical variables upon admission to the rehabilitation hospitals. Information on total direct cost and medical complications during hospitalization were also recorded. The outcome variables measured were total direct cost, LOHS and discharges to institutions (acute care and nursing home facility) and their determinants. The mean and median LOHS in our study were 34 days (SD = 18) and 32 days respectively. LOHS and the cost of hospital stay were significantly correlated. The significant variables associated with LOHS on multiple linear regression analysis were: (i) severe functional impairment/functional dependence Barthel Index institutional discharges (22 to acute care and 17 to nursing homes). On multivariate analysis the significant predictors of discharges to institutions from rehabilitation hospitals were medical complications (OR = 4.37; 95% CI 1.01-12.53) and severe functional impairment/functional dependence. (OR = 5.90, 95% CI 2.32-14.98). Length of hospital stay and discharges to institutions from rehabilitation settings are significantly determined by medical complications. Importance of adhering to clinical pathway/protocol for stroke care is further discussed.

  19. New benchmarks for costs and cost-efficiency of school-based feeding programs in food-insecure areas.

    Science.gov (United States)

    Gelli, Aulo; Cavallero, Andrea; Minervini, Licia; Mirabile, Mariana; Molinas, Luca; de la Mothe, Marc Regnault

    2011-12-01

    School feeding is a popular intervention that has been used to support the education, health and nutrition of school children. Although the benefits of school feeding are well documented, the evidence on the costs of such programs is remarkably thin. Address the need for systematic estimates of the cost of different school feeding modalities, and of the determinants of the considerable cost variation among countries. WFP project data, including expenditures and number of schoolchildren covered, were collected for 78 projects in 62 countries through project reports and validated through WFP Country Office records. Yearly project costs per schoolchild were standardized over a set number of feeding days and the amount of energy provided by the average ration. Output metrics, such as tonnage, calories, and micronutrient content, were used to assess the cost-efficiency of the different delivery mechanisms. The standardized yearly average school feeding cost per child, not including school-level costs, was US$48. The yearly costs per child were lowest at US$23 for biscuit programs reaching school-going children and highest at US$75 for take-home rations programs reaching families of schoolgoing children. The average cost of programs combining on-site meals with extra take-home rations for children from vulnerable households was US$61. Commodity costs were on average 58% of total costs and were highest for biscuit and take-home rations programs (71% and 68%, respectively). Fortified biscuits provided the most cost-efficient option in terms of micronutrient delivery, whereas take-home rations were more cost-efficient in terms of food quantities delivered. Both costs and effects should be considered carefully when designing school feeding interventions. The average costs of school feeding estimated here are higher than those found in earlier studies but fall within the range of costs previously reported. Because this analysis does not include school-level costs, these

  20. Administration and transaction cost estimates for a greenhouse gas offset system : final report

    International Nuclear Information System (INIS)

    2004-01-01

    Canada's Climate Change Plan provides large final emitters (LFEs) with the option to meet their emission targets through the purchase of domestic greenhouse gas (GHG) offset credits. This paper presents the results of a study which identified and estimated transaction costs associated with an offset system. The cost to both proponents and governments were identified. The study also suggested ways to reduce administration and transaction costs through design options. The study considered projects involving agriculture, forests, landfill gas capture, renewable energy and energy efficiency within a potential domestic offset system. It was determined that average transaction costs per tonne range from $19 per tonne to $0.05 depending on the design choice and project type. Total administration costs did not vary more than 5 per cent between different design choices. The total system costs, which are the combination of all transaction and administration costs, are the best indicator for the potential of a project. Eight case studies were examined and costs per tonne were presented. According to the results, the best opportunities to reduce both transaction and administration costs are to choose a broad approach to baselines, boundaries and quantification; and, to allow pooling in the forestry and agriculture sectors. Transaction costs can be lowered further by reducing the frequency of monitoring and verification and allowing pre-2008 crediting. refs., tabs., figs

  1. Analysing uncertainty around costs of innovative medical technologies: the case of fibrin sealant (QUIXIL) for total knee replacement.

    NARCIS (Netherlands)

    Steuten, Lotte Maria Gertruda; Vallejo-Torres, Laura; Bastide, Philippe; Buxton, Martin J.

    2009-01-01

    This paper presents a relatively simple cost model comparing the costs of using a commercial fibrin sealant (QUIXIL®) in addition to conventional haemostatic treatment vs. conventional treatment alone in total knee replacement (TKR) surgery, and demonstrates and discusses how one- and two-way

  2. The cost-effectiveness of quality improvement projects: a conceptual framework, checklist and online tool for considering the costs and consequences of implementation-based quality improvement.

    Science.gov (United States)

    Thompson, Carl; Pulleyblank, Ryan; Parrott, Steve; Essex, Holly

    2016-02-01

    In resource constrained systems, decision makers should be concerned with the efficiency of implementing improvement techniques and technologies. Accordingly, they should consider both the costs and effectiveness of implementation as well as the cost-effectiveness of the innovation to be implemented. An approach to doing this effectively is encapsulated in the 'policy cost-effectiveness' approach. This paper outlines some of the theoretical and practical challenges to assessing policy cost-effectiveness (the cost-effectiveness of implementation projects). A checklist and associated (freely available) online application are also presented to help services develop more cost-effective implementation strategies. © 2015 John Wiley & Sons, Ltd.

  3. Cost-Effectiveness of Reverse Total Shoulder Arthroplasty Versus Arthroscopic Rotator Cuff Repair for Symptomatic Large and Massive Rotator Cuff Tears.

    Science.gov (United States)

    Makhni, Eric C; Swart, Eric; Steinhaus, Michael E; Mather, Richard C; Levine, William N; Bach, Bernard R; Romeo, Anthony A; Verma, Nikhil N

    2016-09-01

    To compare the cost-effectiveness within the United States health care system of arthroscopic rotator cuff repair versus reverse total shoulder arthroplasty in patients with symptomatic large and massive rotator cuff tears without cuff-tear arthropathy. An expected-value decision analysis was constructed comparing the costs and outcomes of patients undergoing arthroscopic rotator cuff repair and reverse total shoulder arthroplasty for large and massive rotator cuff tears (and excluding cases of cuff-tear arthropathy). Comprehensive literature search provided input data to extrapolate costs and health utility states for these outcomes. The primary outcome assessed was that of incremental cost-effectiveness ratio (ICER) of reverse total shoulder arthroplasty versus rotator cuff repair. For the base case, both arthroscopic rotator cuff repair and reverse total shoulder were superior to nonoperative care, with an ICER of $15,500/quality-adjusted life year (QALY) and $37,400/QALY, respectively. Arthroscopic rotator cuff repair was dominant over primary reverse total shoulder arthroplasty, with lower costs and slightly improved clinical outcomes. Arthroscopic rotator cuff repair was the preferred strategy as long as the lifetime progression rate from retear to end-stage cuff-tear arthropathy was less than 89%. However, when the model was modified to account for worse outcomes when reverse shoulder arthroplasty was performed after a failed attempted rotator cuff repair, primary reverse total shoulder had superior outcomes with an ICER of $90,000/QALY. Arthroscopic rotator cuff repair-despite high rates of tendon retearing-for patients with large and massive rotator cuff tears may be a more cost-effective initial treatment strategy when compared with primary reverse total shoulder arthroplasty and when assuming no detrimental impact of previous surgery on outcomes after arthroplasty. Clinical judgment should still be prioritized when formulating treatment plans for these

  4. Multi-Product Total Cost of Function for Higher Education: A Case of Bible Colleges.

    Science.gov (United States)

    Koshal, Rajindar K.; Koshal, Manjulika; Gupta, Ashok

    2001-01-01

    This study empirically estimates a multiproduct total cost function and output relationship for comprehensive U.S. universities. Statistical results for 184 Bible colleges suggest that there are both economies of scale and of scope in higher education. Additionally, product-specific economies of scope exist for all output levels and activities.…

  5. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  6. Costs of delivering human papillomavirus vaccination to schoolgirls in Mwanza Region, Tanzania

    Science.gov (United States)

    2012-01-01

    Background Cervical cancer is the leading cause of female cancer-related deaths in Tanzania. Vaccination against human papillomavirus (HPV) offers a new opportunity to control this disease. This study aimed to estimate the costs of a school-based HPV vaccination project in three districts in Mwanza Region (NCT ID: NCT01173900), Tanzania and to model incremental scaled-up costs of a regional vaccination program. Methods We first conducted a top-down cost analysis of the vaccination project, comparing observed costs of age-based (girls born in 1998) and class-based (class 6) vaccine delivery in a total of 134 primary schools. Based on the observed project costs, we then modeled incremental costs of a scaled-up vaccination program for Mwanza Region from the perspective of the Tanzanian government, assuming that HPV vaccines would be delivered through the Expanded Programme on Immunization (EPI). Results Total economic project costs for delivering 3 doses of HPV vaccine to 4,211 girls were estimated at about US$349,400 (including a vaccine price of US$5 per dose). Costs per fully-immunized girl were lower for class-based delivery than for age-based delivery. Incremental economic scaled-up costs for class-based vaccination of 50,290 girls in Mwanza Region were estimated at US$1.3 million. Economic scaled-up costs per fully-immunized girl were US$26.41, including HPV vaccine at US$5 per dose. Excluding vaccine costs, vaccine could be delivered at an incremental economic cost of US$3.09 per dose and US$9.76 per fully-immunized girl. Financial scaled-up costs, excluding costs of the vaccine and salaries of existing staff were estimated at US$1.73 per dose. Conclusions Project costs of class-based vaccination were found to be below those of age-based vaccination because of more eligible girls being identified and higher vaccine uptake. We estimate that vaccine can be delivered at costs that would make HPV vaccination a very cost-effective intervention. Potentially

  7. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  8. Linear collider systems and costs

    International Nuclear Information System (INIS)

    Loew, G.A.

    1993-05-01

    The purpose of this paper is to examine some of the systems and sub-systems involved in so-called ''conventional'' e + e - linear colliders and to study how their design affects the overall cost of these machines. There are presently a total of at least six 500 GeV c. of m. linear collider projects under study in the world. Aside from TESLA (superconducting linac at 1.3 GHz) and CLIC (two-beam accelerator with main linac at 30GHz), the other four proposed e + e - linear colliders can be considered ''conventional'' in that their main linacs use the proven technique of driving room temperature accelerator sections with pulsed klystrons and modulators. The centrally distinguishing feature between these projects is their main linac rf frequency: 3 GHz for the DESY machine, 11.424 GHz for the SLAC and JLC machines, and 14 GHz for the VLEPP machine. The other systems, namely the electron and positron sources, preaccelerators, compressors, damping rings and final foci, are fairly similar from project to project. Probably more than 80% of the cost of these linear colliders will be incurred in the two main linacs facing each other and it is therefore in their design and construction that major savings or extra costs may be found

  9. Simultaneous versus sequential bilateral cochlear implants in adults: Cost analysis in a US setting.

    Science.gov (United States)

    Trinidade, Aaron; Page, Joshua C; Kennett, Sarah W; Cox, Matthew D; Dornhoffer, John L

    2017-11-01

    From a purely surgical efficiency point of view, simultaneous cochlear implantation (SimCI) is more cost-effective than sequential cochlear implantation (SeqCI) when total direct costs are considered (implant and hospital costs). However, in a setting where only SeqCI is practiced and a proportion of initially unilaterally implanted patients do not progress to a second implant, this may not be the case, especially when audiological costs are factored in. We present a cost analysis of such a scenario as would occur in our institution. Retrospective review and cost analysis. Between 2005 and 2015, 370 patients fulfilled the audiological criteria for bilateral implantation. Of those, 267 (72.1%) underwent unilateral cochlear implantation only, 101 (27.3%) progressed to SeqCI, and two underwent SimCI. The total hospital, surgical, and implant costs, and initial implant stimulation series audiological costs between August 2015 and August 2016 (29 adult patients) were used in this analysis. The total hospital, surgical, and implant costs for this period was $2,731,360.42. Based on previous local trends, if a projected eight (27.3%) of these patients decide to progress to SeqCI, this will cost an additional $750,811.04, resulting in an overall total of $3,482,171.46 for these 29 patients. Had all 29 undergone SimCI, the total projected cost would have been $3,332,991.75, representing a total potential saving of $149,179.67 (4.3%). In institutions where only SeqCI is allowed in adults, overall patient management may cost marginally more than if SimCI were practiced. This will be of interest to CI programs and health insurance companies. 4. Laryngoscope, 127:2615-2618, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  10. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  11. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  12. Production costs for SRIC Populus biomass

    International Nuclear Information System (INIS)

    Strauss, C.H.

    1991-01-01

    Production costs for short rotation, intensive culture (SRIC) Populus biomass were developed from commercial-sized plantations under investigation throughout the US. Populus hybrid planted on good quality agricultural sites at a density of 850 cuttings/acre was projected to yield an average of 7 ovendry (OD) tons/acre/year. Discounted cash-flow analysis of multiple rotations showed preharvest production costs of $14/ton (OD). Harvesting and transportation expenses would increase the delivered cost to $35/ton (OD). Although this total cost compared favorably with the regional market price for aspen (Populus tremuloides), future investments in SRIC systems will require the development of biomass energy markets

  13. Cost Savings of Nuclear Power with Total Fuel Reprocessing

    International Nuclear Information System (INIS)

    Solbrig, Charles W.; Benedict, Robert W.

    2006-01-01

    The cost of fast reactor (FR) generated electricity with pyro-processing is estimated in this article. It compares favorably with other forms of energy and is shown to be less than that produced by light water reactors (LWR's). FR's use all the energy in natural uranium whereas LWR's utilize only 0.7% of it. Because of high radioactivity, pyro-processing is not open to weapon material diversion. This technology is ready now. Nuclear power has the same advantage as coal power in that it is not dependent upon a scarce foreign fuel and has the significant additional advantage of not contributing to global warming or air pollution. A jump start on new nuclear plants could rapidly allow electric furnaces to replace home heating oil furnaces and utilize high capacity batteries for hybrid automobiles: both would reduce US reliance on oil. If these were fast reactors fueled by reprocessed fuel, the spent fuel storage problem could also be solved. Costs are derived from assumptions on the LWR's and FR's five cost components: 1) Capital costs: LWR plants cost $106/MWe. FR's cost 25% more. Forty year amortization is used. 2) The annual O and M costs for both plants are 9% of the Capital Costs. 3) LWR fuel costs about 0.0035 $/kWh. Producing FR fuel from spent fuel by pyro-processing must be done in highly shielded hot cells which is costly. However, the five foot thick concrete walls have the advantage of prohibiting diversion. LWR spent fuel must be used as feedstock for the FR initial core load and first two reloads so this FR fuel costs more than LWR fuel. FR fuel costs much less for subsequent core reloads ( 6 /MWe. The annual cost for a 40 year licensed plant would be 2.5 % of this or less if interest is taken into account. All plants will eventually have to replace those components which become radiation damaged. FR's should be designed to replace parts rather than decommission. The LWR costs are estimated to be 2.65 cents/kWh. FR costs are 2.99 cents/kWh for the first

  14. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  15. An integrated framework for cost- benefit analysis in road safety projects using AHP method

    Directory of Open Access Journals (Sweden)

    Mahsa Mohamadian

    2011-10-01

    Full Text Available Cost benefit analysis (CBA is a useful tool for investment decision-making from economic point of view. When the decision involves conflicting goals, the multi-attribute analysis approach is more capable; because there are some social and environmental criteria that cannot be valued or monetized by cost benefit analysis. The complex nature of decision-making in road safety normally makes it difficult to reach a single alternative solution that can satisfy all decision-making problems. Generally, the application of multi-attribute analysis in road sector is promising; however, the applications are in preliminary stage. Some multi-attribute analysis techniques, such as analytic hierarchy process (AHP have been widely used in practice. This paper presents an integrated framework with CBA and AHP methods to select proper alternative in road safety projects. The proposed model of this paper is implemented for a case study of improving a road to reduce the accidents in Iran. The framework is used as an aid to cost benefit tool in road safety projects.

  16. Fiscal 1998 research report on the total electric power loss reduction project for Myanmer; 1998 nendo Myanmer koku denryoku soshitsu sogo teigen project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of Japanese clean development mechanism, study was made on reduction of greenhouse effect gas emission from thermal power plants by reduction of power transmission and distribution losses of power systems in Myanmer. Study was made on technical power transmission and distribution losses for the national grid transmission system, 33kV sub- transmission system of Thaketa substation in Yangong city, and 6.6kV and 400V distribution systems of Latha and Lanmadaw townships in the downtown area of Yangong. Countermeasures for power loss reduction were considered on the basis of the study result. The loss reduction project plan includes a construction cost of 5,134,000US$, loss reduction of 7,726kW, and loss reduction of 33,213,000kWh. The project feasibility and profitability were evaluated by comparison between a financial internal rate of return (FIRR) and an opportunity cost assuming that a discount rate is the opportunity cost. As a result, FIRR was 17.36% and the discount rate was 8.89% in Myanmer. (NEDO)

  17. Windpower project ownership and financing: The cost impacts of alternative development structures

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H. [Lawrence Berkeley National Lab., CA (United States)

    1997-12-31

    This paper uses traditional financial cash-flow techniques to examine the impact of different ownership and financing structures on the cost of wind energy. While most large-scale wind projects are constructed, operated, and financed by non-utility generators (NUGs) via project financing, investor- and publicly-owned utilities have expressed interest in owning and financing their own facilities rather than purchasing wind energy from independent generators. A primary justification for utility ownership is that, because of financing and tax benefits, windpower may be cheaper when developed in this fashion. The results presented in this paper support that justification, though some of the estimated cost savings associated with utility ownership are found to be a result of shortcomings in utility analysis procedures and implicit risk shifting. This paper also discusses the comparative value of the federal production tax credit and renewable energy production incentive; estimates the financing premium paid by NUG wind owners compared to traditional gas-fired generation facilities; and explores the impact of electricity restructuring on financing.

  18. Cost-effective production of biogas from manure – retrogas project

    DEFF Research Database (Denmark)

    Jurado, Esperanza; Gavala, Hariklia N.; Rohold, Lars

    2010-01-01

    , this is the main reason for the poor economic performance of biogas plants in Denmark. The idea of increasing the methane productivity of the manure has triggered the development of new separation technologies for being applied before the anaerobic digestion of the swine manure. Thus, the solid and liquid...... at the development of new separation and liquefaction technology in order to make the anaerobic digestion of swine manure cost efficient and viable.......Transport of large quantities of low concentrated swine manure (total solids around 5-7%) to biogas plants represents a significant proportion of the operating costs for co-digestion plants. Together with the increment of the prices of the industrial effluents that are used for codigestion...

  19. Comparison of the actual costs during removal of concrete layer by high-speed water jets

    Czech Academy of Sciences Publication Activity Database

    Hela, R.; Bodnárová, L.; Novotný, M.; Sitek, Libor; Klich, Jiří; Wolf, I.; Foldyna, Josef

    2012-01-01

    Roč. 13, č. 4 (2012), s. 763-775 ISSN 1611-1699 R&D Projects: GA MŠk ED2.1.00/03.0082 Grant - others:GA TA ČR(CZ) TA01010948; GA MPO(CZ) FR-TI1/387 Institutional support: RVO:68145535 Keywords : computation model * total technological costs * total fixed costs * total variable costs * Triple helix model Subject RIV: JQ - Machines ; Tools Impact factor: 1.881, year: 2012 http://www.tandfonline.com/doi/pdf/10.3846/16111699.2011.645866

  20. Prediction of Decommissioning Cost for Kijang Research Reactor Using Power Data of DACCORD

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Yun Jeong; Jin, Hyung Gon; Park, Hee Seong; Park, Seung Kook [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are 3 types of cost estimate that can be used, and each have a different level of accuracy: (i) Order of magnitude estimate: One without detailed engineering data, where an estimate is prepared using scale-up or -down factors and approximate ratios. It is likely that the overall scope of the project has not been well defined. The level of accuracy expected is -30% to +50%. The cost plans to predict referring to abroad examples as decommissioning cost estimation has still not developed and been commercial method for Kijang research reactor. In Kijang research reactor case, overall scope of business isn't yet decided. Then it is supposed to estimate cost with type (i). The IAEA project, entitled 'DACCORD' (Data Analysis and Collection for Costing of Research Reactor Decommissioning) performs decommissioning costing after collecting and analyzing the information related to research reactors around the world for several years. Also decommissioning costing method development tends to increase in the each country. This paper aims to estimate preliminary decommissioning cost based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD project' data which is collected by member state. In this paper, preliminary decommissioning cost is estimated based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD data which is collected by member state. Although there exists a general tendency for costs to increase with increasing thermal power, the limited data available show that decommissioning costs at any given power level can vary widely, with increased variability at higher power levels. Variations in decommissioning cost for the research reactors of the same or similar thermal power are caused by differences in reactor types and design, decommissioning project scopes, country- specific unit workforce costs, and other reactor or project factors. An important factor for the

  1. Direct hospital costs of total laparoscopic hysterectomy compared with fast-track open hysterectomy at a tertiary hospital: a retrospective case-controlled study.

    Science.gov (United States)

    Rhou, Yoon J J; Pather, Selvan; Loadsman, John A; Campbell, Neil; Philp, Shannon; Carter, Jonathan

    2015-12-01

    To assess the direct intraoperative and postoperative costs in women undergoing total laparoscopic hysterectomy and fast-track open hysterectomy. A retrospective review of the direct hospital-related costs in a matched cohort of women undergoing total laparoscopic hysterectomy (TLH) and fast-track open hysterectomy (FTOH) at a tertiary hospital. All costs were calculated, including the cost of advanced high-energy laparoscopic devices. The effect of the learning curve on cost in laparoscopic hysterectomy was also assessed, as was the hospital case-weighted cost, which was compared with the actual cost. Fifty women were included in each arm of the study. TLH had a higher intraoperative cost, but a lower postoperative cost than FTOH (AUD$3877 vs AUD$2776 P funding model in our hospital is inaccurate when compared to directly calculated hospital costs. © 2013 The Authors ANZJOG © 2013 The Royal Australian and New Zealand College of Obstetricians and Gynaecologists.

  2. The cost and value of pre-registration clinical placements for Project 2000 students.

    Science.gov (United States)

    Jones, M L; Akehurst, R

    1999-07-01

    The research outlined in this article was commissioned by the Sheffield and North Trent College of Nursing and Midwifery to explore the cost implications of pre-registration clinical placements in the context of Project 2000. The authors outline the methodology and findings of an exercise designed to collect relevant cost information which was not readily available. On the basis of these findings, they suggest that: at 1995/1996 pay and prices, clinical placements cost the education provider approximately pound 890 per student per annum; in terms of real resources, the value to service providers of the service contribution made by second- and third-year nursing and midwifery students on ward-based placements outweighs the value of the time spent by qualified staff on their supervision and education. Once the funding assumptions underlying the introduction of Project 2000 have been taken into account, second- and third-year nursing and midwifery students benefit the service provider by on average pound 3.46 for every hour they spend in an unrostered ward-based placement. The service contribution made by students in community-based clinical placements cannot free staff time in the same way as on the wards and, because qualified staff in these areas are generally more highly graded, the value of the time they spend on the supervision and education of students on placement is higher than in ward-based placements. Second- and third-year students therefore appear to cost the service provider on average pound 0.48 for each hour they spend in a community-based placement. It was not possible to determine whether this cost translates into a reduction in patient contacts.

  3. A comparison of hospital administrative costs in eight nations: US costs exceed all others by far.

    Science.gov (United States)

    Himmelstein, David U; Jun, Miraya; Busse, Reinhard; Chevreul, Karine; Geissler, Alexander; Jeurissen, Patrick; Thomson, Sarah; Vinet, Marie-Amelie; Woolhandler, Steffie

    2014-09-01

    A few studies have noted the outsize administrative costs of US hospitals, but no research has compared these costs across multiple nations with various types of health care systems. We assembled a team of international health policy experts to conduct just such a challenging analysis of hospital administrative costs across eight nations: Canada, England, Scotland, Wales, France, Germany, the Netherlands, and the United States. We found that administrative costs accounted for 25.3 percent of total US hospital expenditures--a percentage that is increasing. Next highest were the Netherlands (19.8 percent) and England (15.5 percent), both of which are transitioning to market-oriented payment systems. Scotland and Canada, whose single-payer systems pay hospitals global operating budgets, with separate grants for capital, had the lowest administrative costs. Costs were intermediate in France and Germany (which bill per patient but pay separately for capital projects) and in Wales. Reducing US per capita spending for hospital administration to Scottish or Canadian levels would have saved more than $150 billion in 2011. This study suggests that the reduction of US administrative costs would best be accomplished through the use of a simpler and less market-oriented payment scheme. Project HOPE—The People-to-People Health Foundation, Inc.

  4. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  5. Do illness rating systems predict discharge location, length of stay, and cost after total hip arthroplasty?

    Directory of Open Access Journals (Sweden)

    Sarah E. Rudasill, BA

    2018-06-01

    Conclusions: These findings suggest that although ASA classifications predict discharge location and SOI scores predict length of stay and total costs, other factors beyond illness rating systems remain stronger predictors of discharge for THA patients.

  6. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  7. Reconciling quality and cost: A case study in interventional radiology

    International Nuclear Information System (INIS)

    Zhang, Li; Mahnken, Andreas; Domroese, Sascha

    2015-01-01

    To provide a method to calculate delay cost and examine the relationship between quality and total cost. The total cost including capacity, supply and delay cost for running an interventional radiology suite was calculated. The capacity cost, consisting of labour, lease and overhead costs, was derived based on expenses per unit time. The supply cost was calculated according to actual procedural material use. The delay cost and marginal delay cost derived from queueing models was calculated based on waiting times of inpatients for their procedures. Quality improvement increased patient safety and maintained the outcome. The average daily delay costs were reduced from 1275 EUR to 294 EUR, and marginal delay costs from approximately 2000 EUR to 500 EUR, respectively. The one-time annual cost saved from the transfer of surgical to radiological procedures was approximately 130,500 EUR. The yearly delay cost saved was approximately 150,000 EUR. With increased revenue of 10,000 EUR in project phase 2, the yearly total cost saved was approximately 290,000 EUR. Optimal daily capacity of 4.2 procedures was determined. An approach for calculating delay cost toward optimal capacity allocation was presented. An overall quality improvement was achieved at reduced costs. (orig.)

  8. Reconciling quality and cost: A case study in interventional radiology

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Li; Mahnken, Andreas [University Hospital Giessen and Marburg, Philipps University of Marburg, Department of Diagnostic and Interventional Radiology, Baldinger Strasse, Marburg (Germany); Domroese, Sascha [University Hospital Giessen and Marburg, Philipps University of Marburg, Division of Controlling, Baldinger Strasse, Marburg (Germany)

    2015-10-15

    To provide a method to calculate delay cost and examine the relationship between quality and total cost. The total cost including capacity, supply and delay cost for running an interventional radiology suite was calculated. The capacity cost, consisting of labour, lease and overhead costs, was derived based on expenses per unit time. The supply cost was calculated according to actual procedural material use. The delay cost and marginal delay cost derived from queueing models was calculated based on waiting times of inpatients for their procedures. Quality improvement increased patient safety and maintained the outcome. The average daily delay costs were reduced from 1275 EUR to 294 EUR, and marginal delay costs from approximately 2000 EUR to 500 EUR, respectively. The one-time annual cost saved from the transfer of surgical to radiological procedures was approximately 130,500 EUR. The yearly delay cost saved was approximately 150,000 EUR. With increased revenue of 10,000 EUR in project phase 2, the yearly total cost saved was approximately 290,000 EUR. Optimal daily capacity of 4.2 procedures was determined. An approach for calculating delay cost toward optimal capacity allocation was presented. An overall quality improvement was achieved at reduced costs. (orig.)

  9. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  10. Learning curve approach to projecting cost and performance for photovoltaic technologies

    Science.gov (United States)

    Cody, George D.; Tiedje, Thomas

    1997-10-01

    The current cost of electricity generated by PV power is still extremely high with respect to power supplied by the utility grid, and there remain questions as to whether PV power can ever be competitive with electricity generated by fossil fuels. An objective approach to this important question was given in a previous paper by the authors which introduced analytical tools to define and project the technical/economic status of PV power from 1988 through the year 2010. In this paper, we apply these same tools to update the conclusions of our earlier study in the context of recent announcements by Amoco/Enron-Solar of projected sales of PV power at rates significantly less than the U.S. utility average.

  11. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  12. Efficiency and Cost Analysis of Cell Saver Auto Transfusion System in Total Knee Arthroplasty

    Directory of Open Access Journals (Sweden)

    Mustafa Gökhan Bilgili

    2014-06-01

    Full Text Available Background: Blood loss and replacement is still a controversial issue in major orthopaedic surgery. Allogenic blood transfusion may cause legal problems and concerns regarding the transmission of transfusion-related diseases. Cellsaver Systems (CSS were developed as an alternative to allogenic transfusion but CSS transfusion may cause coagulation, infection and haemodynamic instability. Aims: Our aim was to analyse the efficiency and cost analysis of a cell saver auto-transfusion system in the total knee arthroplasty procedure. Study Design: Retrospective comparative study. Methods: Those patients who were operated on by unilateral, cemented total knee arthroplasty (TKA were retrospectively evaluated. Group 1 included 37 patients who were treated using the cell saver system, and Group 2 involved 39 patients who were treated by allogenic blood transfusion. The groups were compared in terms of preoperative haemoglobin and haematocrit levels, blood loss and transfusion amount, whether allogenic transfusion was made, degree of deformity, body mass index and cost. Results: No significant results could be obtained in the statistical comparisons made in terms of the demographic properties, deformity properties, preoperative laboratory values, transfusion amount and length of hospital stay of the groups. Average blood loss was calculated to be less in Group 1 (p<0.05 and cost was higher in Group 1 (p<0.05. Conclusion: Cell saver systems do not decrease the amount of allogenic blood transfusion and costs more. Therefore, the routine usage of the auto-transfusion systems is a controversial issue. Cell saver system usage does not affect allogenic blood transfusion incidence or allogenic blood transfusion volume. It was found that preoperative haemoglobin and body mass index rates may affect allogenic blood transfusion. Therefore, it is foreseen that auto-transfusion systems could be useful in patients with low haemoglobin level and body mass index.

  13. Automotive Manufacturers' Cost/Revenue, Financial and Risk Analysis : Projected Impact of Automobile Manufacturing on the Plastics Industry

    Science.gov (United States)

    1979-08-01

    The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...

  14. Carbon Accounting and Cost Estimation in Forestry Projects Using CO2Fix V.3

    International Nuclear Information System (INIS)

    Groen, T.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is applied to four cases: (1) Joint implementation afforestation project in Romania, (2) Forest management project in Central Europe, (3) Reduced impact logging possibly under the Clean Development Mechanism (CDM) in the future, and (4) Afforestation with native species under the Clean Development Mechanism. The results show the wide applicability of CO2FIX, from degrading grasslands as baseline cases to multiple cohort forest ecosystems. Also the results show that Forest Management in the European case can generate considerable amounts of carbon emission reductions. Further, the results show that although reduced impact logging is not yet an allowed option under the Clean Development Mechanism, it shows promising results in that it is (1) very cost effective, (2) seems to be able to generate intermediate amounts of credits and (3) seems to us as a project type that is not prone to leakage issues. These results are yet another indication to seriously consider reduced impact logging as an eligible measure under the CDM

  15. Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Group).

    Science.gov (United States)

    Kim, Jae Kyoung; Jeong, Ina; Lee, Ji Yeon; Kim, Jung Hyun; Han, Ah Yeon; Kim, So Yeon; Joh, Joon Sung

    2018-03-07

    The "Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Groups)" is a national program for socioeconomically vulnerable tuberculosis (TB) patients. We sought to evaluate the clinical and socioeconomic characteristics of poverty-stricken TB patients, and determined the need for relief. We examined in-patients with TB, who were supported by this project at the National Medical Center from 2014 to 2015. We retrospectively investigated the patients' socioeconomic status, clinical characteristics, and project expenditures. Fifty-eight patients were enrolled. Among 55 patients with known income status, 24 (43.6%) had no income. Most patients (80%) lived alone. A total of 48 patients (82.8%) had more than one underlying disease. More than half of the enrolled patients (30 patients, 51.7%) had smear-positive TB. Cavitary disease was found in 38 patients (65.5%). Among the 38 patients with known resistance status, 19 (50%) had drug-resistant TB. In terms of disease severity, 96.6% of the cases had moderate-to-severe disease. A total of 14 patients (26.4%) died during treatment. Nursing expenses were supported for 12 patients (20.7%), with patient transportation costs reimbursed for 35 patients (60%). In terms of treatment expenses for 31 people (53.4%), 93.5% of them were supported by uninsured benefits. Underlying disease, infectivity, drug resistance, severity, and death occurred frequently in socioeconomically vulnerable patients with TB. Many uninsured treatment costs were not supported by the current government TB programs, and the "Tuberculosis Relief Belt Supporting Project" compensated for these limitations. Copyright©2018. The Korean Academy of Tuberculosis and Respiratory Diseases.

  16. Comparative cost analysis -- computed tomography vs. alternative diagnostic procedures, 1977-1980

    International Nuclear Information System (INIS)

    Gempel, P.A.; Harris, G.H.; Evans, R.G.

    1977-12-01

    In comparing the total national cost of utilizing computed tomography (CT) for medically indicated diagnoses with that of conventional x-ray, ultrasonography, nuclear medicine, and exploratory surgery, this investigation concludes that there was little, if any, added net cost from CT use in 1977 or will there be in 1980. Computed tomography, generally recognized as a reliable and useful diagnostic modality, has the potential to reduce net costs provided that an optimal number of units can be made available to physicians and patients to achieve projected reductions in alternative procedures. This study examines the actual cost impact of CT on both cranial and body diagnostic procedures. For abdominal and mediastinal disorders, CT scanning is just beginning to emerge as a diagnostic modality. As such, clinical experience is somewhat limited and the authors assume that no significant reduction in conventional procedures took place in 1977. It is estimated that the approximately 375,000 CT body procedures performed in 1977 represent only a 5 percent cost increase over use of other diagnostic modalities. It is projected that 2,400,000 CT body procedures will be performed in 1980 and, depending on assumptions used, total body diagnostic costs will increase only slightly or be reduced. Thirty-one tables appear throughout the text presenting cost data broken down by types of diagnostic procedures used and projections by years. Appendixes present technical cost components for diagnostic procedures, the comparative efficacy of CT as revealed in abstracts of published literature, selected medical diagnoses, and references

  17. Predictors for total medical costs for acute hemorrhagic stroke patients transferred to the rehabilitation ward at a regional hospital in Taiwan.

    Science.gov (United States)

    Chen, Chien-Min; Ke, Yen-Liang

    2016-02-01

    One-third of the acute stroke patients in Taiwan receive rehabilitation. It is imperative for clinicians who care for acute stroke patients undergoing inpatient rehabilitation to identify which medical factors could be the predictors of the total medical costs. The aim of this study was to identify the most important predictors of the total medical costs for first-time hemorrhagic stroke patients transferred to inpatient rehabilitation using a retrospective design. All data were retrospectively collected from July 2002 to June 2012 from a regional hospital in Taiwan. A stepwise multivariate linear regression analysis was used to identify the most important predictors for the total medical costs. The medical records of 237 patients (137 males and 100 females) were reviewed. The mean total medical cost per patient was United States dollar (USD) 5939.5 ± 3578.5.The following were the significant predictors for the total medical costs: impaired consciousness [coefficient (B), 1075.7; 95% confidence interval (CI) = 138.5-2012.9], dysphagia [coefficient (B), 1025.8; 95% CI = 193.9-1857.8], number of surgeries [coefficient (B), 796.4; 95% CI = 316.0-1276.7], pneumonia in the neurosurgery ward [coefficient (B), 2330.1; 95% CI = 1339.5-3320.7], symptomatic urinary tract infection (UTI) in the rehabilitation ward [coefficient (B), 1138.7; 95% CI = 221.6-2055.7], and rehabilitation ward stay [coefficient (B), 64.9; 95% CI = 31.2-98.7] (R(2) = 0.387). Our findings could help clinicians to understand that cost reduction may be achieved by minimizing complications (pneumonia and UTI) in these patients.

  18. Los Alamos Scientific Laboratory building cost index

    International Nuclear Information System (INIS)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL

  19. Los Alamos Scientific Laboratory building cost index

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL.

  20. Life cycle cost analysis changes mixed waste treatment program at the Savannah River Site

    International Nuclear Information System (INIS)

    Pickett, J.B.; England, J.L.; Martin, H.L.

    1992-01-01

    A direct result of the reduced need for weapons production has been a re-evaluation of the treatment projects for mixed (hazardous/radioactive) wastes generated from metal finishing and plating operations and from a mixed waste incinerator at the Savannah River Site (SRS). A Life Cycle Cost (LCC) analysis was conducted for two waste treatment projects to determine the most cost effective approach in response to SRS mission changes. A key parameter included in the LCC analysis was the cost of the disposal vaults required for the final stabilized wasteform(s) . The analysis indicated that volume reduction of the final stabilized wasteform(s) can provide significant cost savings. The LCC analysis demonstrated that one SRS project could be eliminated, and a second project could be totally ''rescoped and downsized.'' The changes resulted in an estimated Life Cycle Cost saving (over a 20 year period) of $270,000,000

  1. Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

    Science.gov (United States)

    Rosenberg, Leigh; Hihn, Jairus; Roust, Kevin; Warfield, Keith

    2000-01-01

    This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

  2. Costs of lithium-ion batteries for vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Gaines, L.; Cuenca, R.

    2000-08-21

    One of the most promising battery types under development for use in both pure electric and hybrid electric vehicles is the lithium-ion battery. These batteries are well on their way to meeting the challenging technical goals that have been set for vehicle batteries. However, they are still far from achieving the current cost goals. The Center for Transportation Research at Argonne National Laboratory undertook a project for the US Department of Energy to estimate the costs of lithium-ion batteries and to project how these costs might change over time, with the aid of research and development. Cost reductions could be expected as the result of material substitution, economies of scale in production, design improvements, and/or development of new material supplies. The most significant contributions to costs are found to be associated with battery materials. For the pure electric vehicle, the battery cost exceeds the cost goal of the US Advanced Battery Consortium by about $3,500, which is certainly enough to significantly affect the marketability of the vehicle. For the hybrid, however, the total cost of the battery is much smaller, exceeding the cost goal of the Partnership for a New Generation of Vehicles by only about $800, perhaps not enough to deter a potential buyer from purchasing the power-assist hybrid.

  3. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  4. Lifetime cost effectiveness of a through-school nutrition and physical programme: Project Energize.

    Science.gov (United States)

    Rush, Elaine; Obolonkin, Victor; McLennan, Stephanie; Graham, David; Harris, James D; Mernagh, Paul; Weston, Adéle R

    2014-01-01

    Project Energize, a multicomponent through-school physical activity and nutrition programme, is delivered to all primary school children in the Waikato region. The programme aim is to improve the overall health and reduce the rate of weight gain of all Waikato primary school children. An existing economic model was used to extrapolate the programme effects, initial costs, lifetime health treatment cost structures, quality-adjusted-life-years gained and increased life expectancy to the general and Māori child population of New Zealand. In March 2011, a sample of 2474 younger (7.58 ± 0.57 years, mean ± SD) and 2330 older (10.30 ± 0.51 years) children (36% Māori) attending Energize schools had body mass index measured and compared using mixed effect modelling with unEnergized comparison children from 2004 and 2006 from the same region. In 2011 the median body mass index reduction compared with the comparison younger children was -0.504 (90% CI -0.435 to -0.663) kg/m(2) and in the older children -0.551 (-0.456 to -0.789) kg/m(2). In 2010 there were 42,067 children attending Energize schools and in the same year NZ$1,891,175 was spent to deliver the programme; a cost of $44.96/child/year. Compared to the comparison children the increment in cost/quality-adjusted-life-year gained was $30,438 for the younger and $24,690 for the older children, and lower for Māori (younger $28,241, older $22,151) and for the middle socioeconomic status schools ($23,211, $17,891). Project Energize would improve quality and length of life and when compared with other obesity prevention programmes previously assessed with this model, it would be relatively cost-effective from the health treatment payer's perspective.

  5. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  6. The cost of making compensation payments to local forest ...

    African Journals Online (AJOL)

    Comparing our estimated total cost to the current budget of the REDD+ project, we ..... ent using local market prices to calculate the income derived from each crop. We classed ... transport, accommodation and expenses of people in charge of.

  7. Minnesota wood energy scale-up project 1994 establishment cost data

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M. [Oak Ridge National Lab., TN (United States); Pierce, R. [Champion International, Alexandria, MN (United States); Kroll, T. [Minnesota Department of Natural Resources-Forestry, St. Cloud, MN (United States)

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. These extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.

  8. Cost of individual peer counselling for the promotion of exclusive breastfeeding in Uganda

    Directory of Open Access Journals (Sweden)

    Nankunda Jolly

    2011-06-01

    Full Text Available Abstract Background Exclusive breastfeeding (EBF for 6 months is the recommended form of infant feeding. Support of mothers through individual peer counselling has been proved to be effective in increasing exclusive breastfeeding prevalence. We present a costing study of an individual peer support intervention in Uganda, whose objective was to raise exclusive breastfeeding rates at 3 months of age. Methods We costed the peer support intervention, which was offered to 406 breastfeeding mothers in Uganda. The average number of counselling visits was about 6 per woman. Annual financial and economic costs were collected in 2005-2008. Estimates were made of total project costs, average costs per mother counselled and average costs per peer counselling visit. Alternative intervention packages were explored in the sensitivity analysis. We also estimated the resources required to fund the scale up to district level, of a breastfeeding intervention programme within a public health sector model. Results Annual project costs were estimated to be US$56,308. The largest cost component was peer supporter supervision, which accounted for over 50% of total project costs. The cost per mother counselled was US$139 and the cost per visit was US$26. The cost per week of EBF was estimated to be US$15 at 12 weeks post partum. We estimated that implementing an alternative package modelled on routine public health sector programmes can potentially reduce costs by over 60%. Based on the calculated average costs and annual births, scaling up modelled costs to district level would cost the public sector an additional US$1,813,000. Conclusion Exclusive breastfeeding promotion in sub-Saharan Africa is feasible and can be implemented at a sustainable cost. The results of this study can be incorporated in cost effectiveness analyses of exclusive breastfeeding promotion programmes in sub-Saharan Africa.

  9. Efficiency and cost analysis of cell saver auto transfusion system in total knee arthroplasty.

    Science.gov (United States)

    Bilgili, Mustafa Gökhan; Erçin, Ersin; Peker, Gökhan; Kural, Cemal; Başaran, Serdar Hakan; Duramaz, Altuğ; Avkan, Cevdet

    2014-06-01

    Blood loss and replacement is still a controversial issue in major orthopaedic surgery. Allogenic blood transfusion may cause legal problems and concerns regarding the transmission of transfusion-related diseases. Cellsaver Systems (CSS) were developed as an alternative to allogenic transfusion but CSS transfusion may cause coagulation, infection and haemodynamic instability. Our aim was to analyse the efficiency and cost analysis of a cell saver auto-transfusion system in the total knee arthroplasty procedure. Retrospective comparative study. Those patients who were operated on by unilateral, cemented total knee arthroplasty (TKA) were retrospectively evaluated. Group 1 included 37 patients who were treated using the cell saver system, and Group 2 involved 39 patients who were treated by allogenic blood transfusion. The groups were compared in terms of preoperative haemoglobin and haematocrit levels, blood loss and transfusion amount, whether allogenic transfusion was made, degree of deformity, body mass index and cost. No significant results could be obtained in the statistical comparisons made in terms of the demographic properties, deformity properties, preoperative laboratory values, transfusion amount and length of hospital stay of the groups. Average blood loss was calculated to be less in Group 1 (pblood transfusion and costs more. Therefore, the routine usage of the auto-transfusion systems is a controversial issue. Cell saver system usage does not affect allogenic blood transfusion incidence or allogenic blood transfusion volume. It was found that preoperative haemoglobin and body mass index rates may affect allogenic blood transfusion. Therefore, it is foreseen that auto-transfusion systems could be useful in patients with low haemoglobin level and body mass index.

  10. Cost-benefit calculation of phytoremediation technology for heavy-metal-contaminated soil.

    Science.gov (United States)

    Wan, Xiaoming; Lei, Mei; Chen, Tongbin

    2016-09-01

    Heavy-metal pollution of soil is a serious issue worldwide, particularly in China. Soil remediation is one of the most difficult management issues for municipal and state agencies because of its high cost. A two-year phytoremediation project for soil contaminated with arsenic, cadmium, and lead was implemented to determine the essential parameters for soil remediation. Results showed highly efficient heavy metal removal. Costs and benefits of this project were calculated. The total cost of phytoremediation was US$75,375.2/hm(2) or US$37.7/m(3), with initial capital and operational costs accounting for 46.02% and 53.98%, respectively. The costs of infrastructures (i.e., roads, bridges, and culverts) and fertilizer were the highest, mainly because of slow economic development and serious contamination. The cost of phytoremediation was lower than the reported values of other remediation technologies. Improving the mechanization level of phytoremediation and accurately predicting or preventing unforeseen situations were suggested for further cost reduction. Considering the loss caused by environmental pollution, the benefits of phytoremediation will offset the project costs in less than seven years. Copyright © 2015 Elsevier B.V. All rights reserved.

  11. Estimating direct and indirect costs of premenstrual syndrome.

    Science.gov (United States)

    Borenstein, Jeff; Chiou, Chiun-Fang; Dean, Bonnie; Wong, John; Wade, Sally

    2005-01-01

    To quantify the economic impact of premenstrual syndrome (PMS) on the employer. Data were collected from 374 women aged 18-45 with regular menses. Direct costs were quantified using administrative claims of these patients and the Medicare Fee Schedule. Indirect costs were quantified by both self-reported days of work missed and lost productivity at work. Regression analyses were used to develop a model to project PMS-related direct and indirect costs. A total of 29.6% (n = 111) of the participants were diagnosed with PMS. A PMS diagnosis was associated with an average annual increase of $59 in direct costs (P increase in direct medical costs and a large increase in indirect costs.

  12. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    OpenAIRE

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is a...

  13. Autologous Stem Cell Transplantation in Patients With Multiple Myeloma: An Activity-based Costing Analysis, Comparing a Total Inpatient Model Versus an Early Discharge Model.

    Science.gov (United States)

    Martino, Massimo; Console, Giuseppe; Russo, Letteria; Meliado', Antonella; Meliambro, Nicola; Moscato, Tiziana; Irrera, Giuseppe; Messina, Giuseppe; Pontari, Antonella; Morabito, Fortunato

    2017-08-01

    Activity-based costing (ABC) was developed and advocated as a means of overcoming the systematic distortions of traditional cost accounting. We calculated the cost of high-dose chemotherapy and autologous stem cell transplantation (ASCT) in patients with multiple myeloma using the ABC method, through 2 different care models: the total inpatient model (TIM) and the early-discharge outpatient model (EDOM) and compared this with the approved diagnosis related-groups (DRG) Italian tariffs. The TIM and EDOM models involved a total cost of €28,615.15 and €16,499.43, respectively. In the TIM model, the phase with the greatest economic impact was the posttransplant (recovery and hematologic engraftment) with 36.4% of the total cost, whereas in the EDOM model, the phase with the greatest economic impact was the pretransplant (chemo-mobilization, apheresis procedure, cryopreservation, and storage) phase, with 60.4% of total expenses. In an analysis of each episode, the TIM model comprised a higher absorption than the EDOM. In particular, the posttransplant represented 36.4% of the total costs in the TIM and 17.7% in EDOM model, respectively. The estimated reduction in cost per patient using an EDOM model was over €12,115.72. The repayment of the DRG in Calabrian Region for the ASCT procedure is €59,806. Given the real cost of the transplant, the estimated cost saving per patient is €31,190.85 in the TIM model and €43,306.57 in the EDOM model. In conclusion, the actual repayment of the DRG does not correspond to the real cost of the ASCT procedure in Italy. Moreover, using the EDOM, the cost of ASCT is approximately the half of the TIM model. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. A learning curve approach to projecting cost and performance for photovoltaic technologies

    Science.gov (United States)

    Cody, George D.; Tiedje, Thomas

    1997-04-01

    The current cost of electricity generated by PV power is still extremely high with respect to power supplied by the utility grid, and there remain questions as to whether PV power can ever be competitive with electricity generated by fossil fuels. An objective approach to this important question was given in a previous paper by the authors which introduced analytical tools to define and project the technical/economic status of PV power from 1988 through the year 2010. In this paper, we apply these same tools to update the conclusions of our earlier study in the context of recent announcements by Amoco/Enron-Solarex of projected sales of PV power at rates significantly less than the US utility average.

  15. Skilled Nursing Facility Partnerships May Decrease 90-Day Costs in a Total Joint Arthroplasty Episode Under the Bundled Payments for Care Improvement Initiative.

    Science.gov (United States)

    Behery, Omar A; Kouk, Shalen; Chen, Kevin K; Mullaly, Kathleen A; Bosco, Joseph A; Slover, James D; Iorio, Richard; Schwarzkopf, Ran

    2018-03-01

    The Bundled Payments for Care Improvement initiative was developed to reduce costs associated with total joint arthroplasty through a single payment for all patient care from index admission through a 90-day post-discharge period, including care at skilled nursing facilities (SNFs). The aim of this study is to investigate whether forming partnerships between hospitals and SNFs could lower the post-discharge costs. We hypothesize that institutionally aligned SNFs have lower post-discharge costs than non-aligned SNFs. A cohort of 615 elective, primary total hip and knee arthroplasty subjects discharged to an SNF under the Bundled Payments for Care Improvement from 2014 to 2016 were included in our analysis. Patients were grouped into one of the 3 categories of SNF alignment: group 1: non-partners; group 2: agreement-based partners; group 3: institution-owned partners. Demographics, comorbidities, length of stay (LOS) at SNF, and associated costs during the 90-day post-operative period were compared between the 3 groups. Mean index hospital LOS was statistically shortest in group 3 (mean 2.7 days vs 3.5 for groups 1 and 2, P = .001). SNF LOS was also shortest in group 3 (mean 11 days vs 19 and 21 days in groups 2 and 1 respectively, P Total SNF costs and total 90-day costs were both significantly lower in group 3 compared with groups 1 and 2 (P total 90-day costs, without increased risk of readmissions, compared with other SNFs. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. National Variation in Urethroplasty Cost and Predictors of Extreme Cost: A Cost Analysis With Policy Implications.

    Science.gov (United States)

    Harris, Catherine R; Osterberg, E Charles; Sanford, Thomas; Alwaal, Amjad; Gaither, Thomas W; McAninch, Jack W; McCulloch, Charles E; Breyer, Benjamin N

    2016-08-01

    To determine which factors are associated with higher costs of urethroplasty procedure and whether these factors have been increasing over time. Identification of determinants of extreme costs may help reduce cost while maintaining quality. We conducted a retrospective analysis using the 2001-2010 Healthcare Cost and Utilization Project-Nationwide Inpatient Sample (HCUP-NIS). The HCUP-NIS captures hospital charges which we converted to cost using the HCUP cost-to-charge ratio. Log cost linear regression with sensitivity analysis was used to determine variables associated with increased costs. Extreme cost was defined as the top 20th percentile of expenditure, analyzed with logistic regression, and expressed as odds ratios (OR). A total of 2298 urethroplasties were recorded in NIS over the study period. The median (interquartile range) calculated cost was $7321 ($5677-$10,000). Patients with multiple comorbid conditions were associated with extreme costs [OR 1.56, 95% confidence interval (CI) 1.19-2.04, P = .02] compared with patients with no comorbid disease. Inpatient complications raised the odds of extreme costs (OR 3.2, CI 2.14-4.75, P costs (OR 1.78, 95% CI 1.2-2.64, P = .005). Variations in patient age, race, hospital region, bed size, teaching status, payor type, and volume of urethroplasty cases were not associated with extremes of cost. Cost variation for perioperative inpatient urethroplasty procedures is dependent on preoperative patient comorbidities, postoperative complications, and surgical complexity related to graft usage. Procedural cost and cost variation are critical for understanding which aspects of care have the greatest impact on cost. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Costs of a community-based glaucoma detection programme: analysis of the Philadelphia Glaucoma Detection and Treatment Project.

    Science.gov (United States)

    Pizzi, Laura T; Waisbourd, Michael; Hark, Lisa; Sembhi, Harjeet; Lee, Paul; Crews, John E; Saaddine, Jinan B; Steele, Deon; Katz, L Jay

    2018-02-01

    Glaucoma is the foremost cause of irreversible blindness, and more than 50% of cases remain undiagnosed. Our objective was to report the costs of a glaucoma detection programme operationalised through Philadelphia community centres. The analysis was performed using a healthcare system perspective in 2013 US dollars. Costs of examination and educational workshops were captured. Measures were total programme costs, cost/case of glaucoma detected and cost/case of any ocular disease detected (including glaucoma). Diagnoses are reported at the individual level (therefore representing a diagnosis made in one or both eyes). Staff time was captured during site visits to 15 of 43 sites and included time to deliver examinations and workshops, supervision, training and travel. Staff time was converted to costs by applying wage and fringe benefit costs from the US Bureau of Labor Statistics. Non-staff costs (equipment and mileage) were collected using study logs. Participants with previously diagnosed glaucoma were excluded. 1649 participants were examined. Mean total per-participant examination time was 56 min (SD 4). Mean total examination cost/participant was $139. The cost/case of glaucoma newly identified (open-angle glaucoma, angle-closure glaucoma, glaucoma suspect, or primary angle closure) was $420 and cost/case for any ocular disease identified was $273. Glaucoma examinations delivered through this programme provided significant health benefit to hard-to-reach communities. On a per-person basis, examinations were fairly low cost, though opportunities exist to improve efficiency. Findings serve as an important benchmark for planning future community-based glaucoma examination programmes. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  18. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  19. The cost of post-operative shed blood salvage after total knee arthroplasty: an analysis of 1,093 consecutive procedures

    Science.gov (United States)

    Muñoz, Manuel; Ariza, Daniel; Campos, Arturo; Martín-Montañez, Elisa; Pavía, José

    2013-01-01

    Background Requirements for allogeneic red cell transfusion after total knee arthroplasty are still high (20–50%), and salvage and reinfusion of unwashed, filtered post-operative shed blood is an established method for reducing transfusion requirements following this operation. We performed a cost analysis to ascertain whether this alternative is likely to be cost-effective. Materials and methods Data from 1,093 consecutive primary total knee arthroplasties, managed with (reinfusion group, n=763) or without reinfusion of unwashed salvaged blood (control group, n=330), were retrospectively reviewed. The costs of low-vacuum drains, shed blood collection canisters (Bellovac ABT®, Wellspect HealthCare and ConstaVac CBC II®, Stryker), shed blood reinfusion, acquisition and transfusion of allogeneic red cell concentrate, haemoglobin measurements, and prolonged length of hospital stay were used for the blood management cost analysis. Results Patients in the reinfusion group received 152±64 mL of red blood cells from postoperatively salvaged blood, without clinically relevant incidents, and showed a lower allogeneic transfusion rate (24.5% vs 8.5%, for the control and reinfusion groups, respectively; p =0.001). There were no differences in post-operative infection rates. Patients receiving allogeneic transfusions stayed in hospital longer (+1.9 days [95% CI: 1.2 to 2.6]). As reinfusion of unwashed salvaged blood reduced the allogeneic transfusion rate, both reinfusion systems may provide net savings in different cost scenarios (€ 4.6 to € 106/patient for Bellovac ABT, and € −51.9 to € 49.9/patient for ConstaVac CBCII). Discussion Return of unwashed salvaged blood after total knee arthroplasty seems to save costs in patients with pre-operative haemoglobin between 12 and 15 g/dL. It is not cost-saving in patients with a pre-operative haemoglobin >15 g/dL, whereas in those with a pre-operative haemoglobin cost-saving, its efficacy could be increased by

  20. Using Electromagnetic Algorithm for Total Costs of Sub-contractor Optimization in the Cellular Manufacturing Problem

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shahriari

    2016-12-01

    Full Text Available In this paper, we present a non-linear binary programing for optimizing a specific cost in cellular manufacturing system in a controlled production condition. The system parameters are determined by the continuous distribution functions. The aim of the presented model is to optimize the total cost of imposed sub-contractors to the manufacturing system by determining how to allocate the machines and parts to each seller. In this system, DM could control the occupation level of each machine in the system. For solving the presented model, we used the electromagnetic meta-heuristic algorithm and Taguchi method for determining the optimal algorithm parameters.

  1. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    International Nuclear Information System (INIS)

    Tomes, John J; Finlayson, Chris E

    2016-01-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values. (paper)

  2. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    Science.gov (United States)

    Tomes, John J.; Finlayson, Chris E.

    2016-09-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values.

  3. Cost and schedule reduction for next-generation Candu

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M.

    2002-01-01

    construction costs through more efficient work planning and use of materials, through reduced re-work and through more precise configuration management. Full-scale exploitation of AECL's electronic engineering and project management tools enables further reductions in cost. The Candu fuel-channel reactor type offers inherent manufacturing and construction advantages through the application of a simple, low-pressure low-temperature reactor vessel along with modular fuel channel technology. This leads to cost benefits and total project schedule benefits. As a result, the targets which AECL has set for replication units - overnight capital cost of $1000 US/kW and total project schedule (engineering/manufacturing/construction/commissioning) of 48 months, have been shown to be achievable for the reference NG Candu design. (authors)

  4. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  5. Sovereign cat bonds and infrastructure project financing.

    Science.gov (United States)

    Croson, David; Richter, Andreas

    2003-06-01

    We examine the opportunities for using catastrophe-linked securities (or equivalent forms of nondebt contingent capital) to reduce the total costs of funding infrastructure projects in emerging economies. Our objective is to elaborate on methods to reduce the necessity for unanticipated (emergency) project funding immediately after a natural disaster. We also place the existing explanations of sovereign-level contingent capital into a catastrophic risk management framework. In doing so, we address the following questions. (1) Why might catastrophe-linked securities be useful to a sovereign nation, over and above their usefulness for insurers and reinsurers? (2) Why are such financial instruments ideally suited for protecting infrastructure projects in emerging economies, under third-party sponsorship, from low-probability, high-consequence events that occur as a result of natural disasters? (3) How can the willingness to pay of a sovereign government in an emerging economy (or its external project sponsor), who values timely completion of infrastructure projects, for such instruments be calculated? To supplement our treatment of these questions, we use a multilayer spreadsheet-based model (in Microsoft Excel format) to calculate the overall cost reductions possible through the judicious use of catastrophe-based financial tools. We also report on numerical comparative statics on the value of contingent-capital financing to avoid project disruption based on varying costs of capital, probability and consequences of disasters, the feasibility of strategies for mid-stage project abandonment, and the timing of capital commitments to the infrastructure investment. We use these results to identify high-priority applications of catastrophe-linked securities so that maximal protection can be realized if the total number of catastrophe instruments is initially limited. The article concludes with potential extensions to our model and opportunities for future research.

  6. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2017-09-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  7. Impact of accelerator based technologies on nuclear fission safety - Share cost project of the European Community

    International Nuclear Information System (INIS)

    1997-01-01

    As a result of the growing interest in Accelerator-Driven Systems (ADS), some European institutes have established a shared cost project in the framework of the European Community. The overall objective of the project is to make an assessment of the possibilities of accelerator-driven hybrid reactor systems from the point of view of safe energy production, minimum waste production and transmutation capabilities

  8. Associations between preoperative physical therapy and post-acute care utilization patterns and cost in total joint replacement.

    Science.gov (United States)

    Snow, Richard; Granata, Jaymes; Ruhil, Anirudh V S; Vogel, Karen; McShane, Michael; Wasielewski, Ray

    2014-10-01

    Health-care costs following acute hospital care have been identified as a major contributor to regional variation in Medicare spending. This study investigated the associations of preoperative physical therapy and post-acute care resource use and its effect on the total cost of care during primary hip or knee arthroplasty. Historical claims data were analyzed using the Centers for Medicare & Medicaid Services Limited Data Set files for Diagnosis Related Group 470. Analysis included descriptive statistics of patient demographic characteristics, comorbidities, procedures, and post-acute care utilization patterns, which included skilled nursing facility, home health agency, or inpatient rehabilitation facility, during the ninety-day period after a surgical hospitalization. To evaluate the associations, we used bivariate and multivariate techniques focused on post-acute care use and total episode-of-care costs. The Limited Data Set provided 4733 index hip or knee replacement cases for analysis within the thirty-nine-county Medicare hospital referral cluster. Post-acute care utilization was a significant variable in the total cost of care for the ninety-day episode. Overall, 77.0% of patients used post-acute care services after surgery. Post-acute care utilization decreased if preoperative physical therapy was used, with only 54.2% of the preoperative physical therapy cohort using post-acute care services. However, 79.7% of the non-preoperative physical therapy cohort used post-acute care services. After adjusting for demographic characteristics and comorbidities, the use of preoperative physical therapy was associated with a significant 29% reduction in post-acute care use, including an $871 reduction of episode payment driven largely by a reduction in payments for skilled nursing facility ($1093), home health agency ($527), and inpatient rehabilitation ($172). The use of preoperative physical therapy was associated with a 29% decrease in the use of any post-acute care

  9. Selecting and Ranking Cost Research Projects

    Science.gov (United States)

    1993-09-01

    Model (STACM) Enhancements Automated Cost Estimating Integrated Tools ( ACEIT ) Libraries BM/C 3 GEP Engineering and Cost BM/C 3 EP Engineering and Cost...50K NOM VHI 0.02635481 STACM ENHANCEMENTS NOM អK NOM VHI 0.02468682 ACEIT LIBRARIES VHI 50-IOOK HI VHI 0.06357704 GEP ENGRG. & COST VHI 100-150K VHl...0.02505922 SCATS LOW អK NOM VIII 0.02468682 PICES SUPPORT NOM 50-100K NOM VlIl 0.02455186 ACEIT SUPPORT VIII 50-100K VHI VHI 0.08208244 GUARDIAN

  10. U.S. Department of Energy Hydrogen Storage Cost Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Law, Karen; Rosenfeld, Jeffrey; Han, Vickie; Chan, Michael; Chiang, Helena; Leonard, Jon

    2013-03-11

    The overall objective of this project is to conduct cost analyses and estimate costs for on- and off-board hydrogen storage technologies under development by the U.S. Department of Energy (DOE) on a consistent, independent basis. This can help guide DOE and stakeholders toward the most-promising research, development and commercialization pathways for hydrogen-fueled vehicles. A specific focus of the project is to estimate hydrogen storage system cost in high-volume production scenarios relative to the DOE target that was in place when this cost analysis was initiated. This report and its results reflect work conducted by TIAX between 2004 and 2012, including recent refinements and updates. The report provides a system-level evaluation of costs and performance for four broad categories of on-board hydrogen storage: (1) reversible on-board metal hydrides (e.g., magnesium hydride, sodium alanate); (2) regenerable off-board chemical hydrogen storage materials(e.g., hydrolysis of sodium borohydride, ammonia borane); (3) high surface area sorbents (e.g., carbon-based materials); and 4) advanced physical storage (e.g., 700-bar compressed, cryo-compressed and liquid hydrogen). Additionally, the off-board efficiency and processing costs of several hydrogen storage systems were evaluated and reported, including: (1) liquid carrier, (2) sodium borohydride, (3) ammonia borane, and (4) magnesium hydride. TIAX applied a bottom-up costing methodology customized to analyze and quantify the processes used in the manufacture of hydrogen storage systems. This methodology, used in conjunction with ® software and other tools, developed costs for all major tank components, balance-of-tank, tank assembly, and system assembly. Based on this methodology, the figure below shows the projected on-board high-volume factory costs of the various analyzed hydrogen storage systems, as designed. Reductions in the key cost drivers may bring hydrogen storage system costs closer to this DOE target

  11. Social profile and cost analysis of deep infection following total hip replacement surgery

    Directory of Open Access Journals (Sweden)

    Vera Lucia Frazão

    Full Text Available ABSTRACT OBJECTIVE: To characterize the socio-economic and demographic profile of patients undergoing surgery for revision total hip arthroplasty regarding the diagnosis of deep prosthetic infection. METHODS: Twenty patients were retrospectively studied, admitted in the period between 2009 and 2010 by the Hip Surgery Group with the diagnosis of deep prosthetic infection, whose proposed treatment was surgical. This study was carried out in the presence of the patient by completing two forms applied by the social worker of the Group. RESULTS: In a 20-patient sample, 40% were male, 45% were working age, 50% of patients originated from the capital, 85% depended on benefits, 70% were retired, 60% of patients were from this hospital, and 40% were from other services. The average cost of patients to the public system was R$ 55,821.62 per patient and the total spent on treatment of patients in the study exceeded one million Brazilian reals, totalling R$ 1,116,432.40. CONCLUSION: Infection from total hip arthroplasty generates a major expense to the social security system and to the public healthcare system. Physicians must always be alert to the possible risk factors and perioperative care, striving to minimize this complication.

  12. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  13. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  14. Life cycle cost analysis rehabilitation costs.

    Science.gov (United States)

    2015-07-01

    This study evaluates data from CDOTs Cost Data books and Pavement Management Program. Cost : indices were used to normalize project data to year 2014. Data analyzed in the study was obtained from : the CDOTs Cost Data books and the Pavement Man...

  15. Approaches in estimation of external cost for fuel cycles in the ExternE project

    International Nuclear Information System (INIS)

    Afanas'ev, A.A.; Maksimenko, B.N.

    1998-01-01

    The purposes, content and main results of studies realized within the frameworks of the International Project ExternE which is the first comprehensive attempt to develop general approach to estimation of external cost for different fuel cycles based on utilization of nuclear and fossil fuels, as well as on renewable power sources are discussed. The external cost of a fuel cycle is treated as social and environmental expenditures which are not taken into account by energy producers and consumers, i.e. these are expenditures not included into commercial cost nowadays. The conclusion on applicability of the approach suggested for estimation of population health hazards and environmental impacts connected with electric power generation growth (expressed in money or some other form) is made

  16. Wildfire Suppression Costs for Canada under a Changing Climate.

    Directory of Open Access Journals (Sweden)

    Emily S Hope

    Full Text Available Climate-influenced changes in fire regimes in northern temperate and boreal regions will have both ecological and economic ramifications. We examine possible future wildfire area burned and suppression costs using a recently compiled historical (i.e., 1980-2009 fire management cost database for Canada and several Intergovernmental Panel on Climate Change (IPCC climate projections. Area burned was modelled as a function of a climate moisture index (CMI, and fire suppression costs then estimated as a function of area burned. Future estimates of area burned were generated from projections of the CMI under two emissions pathways for four General Circulation Models (GCMs; these estimates were constrained to ecologically reasonable values by incorporating a minimum fire return interval of 20 years. Total average annual national fire management costs are projected to increase to just under $1 billion (a 60% real increase from the 1980-2009 period under the low greenhouse gas emissions pathway and $1.4 billion (119% real increase from the base period under the high emissions pathway by the end of the century. For many provinces, annual costs that are currently considered extreme (i.e., occur once every ten years are projected to become commonplace (i.e., occur once every two years or more often as the century progresses. It is highly likely that evaluations of current wildland fire management paradigms will be necessary to avoid drastic and untenable cost increases as the century progresses.

  17. Functional and oncologic outcomes after excision of the total femur in primary bone tumors: Results with a low cost total femur prosthesis

    Directory of Open Access Journals (Sweden)

    Ajay Puri

    2012-01-01

    Full Text Available Background: The extent of tumor may necessitate resection of the complete femur rarely to achieve adequate oncologic clearance in bone sarcomas. We present our experience with reconstruction in such cases using an indigenously manufactured, low-cost, total femoral prosthesis (TFP. We assessed the complications of the procedure, the oncologic and functional outcomes, and implant survival. Materials and Methods: Eight patients (four males and four females with a mean age of 32 years, operated between December 2003 and June 2009, had a TFP implanted. The diagnosis included osteogenic sarcoma (5, Ewing′s sarcoma (1, and chondrosarcoma (2. Mean followup was 33 months (9-72 months for all and 40 months (24-72 months in survivors. They were evaluated by Musculoskeletal Tumor Society score, implant survival as well as patient survival. Results: There was one local recurrence and five of seven patients are currently alive at the time of last followup. The Musculoskeletal Tumor Society score for patients ranged from 21 to 25 with a mean of 24 (80%. The implant survival was 88% at 5 years with only one TFP needing removal because of infection. Conclusions: A TFP in appropriately indicated patients with malignant bone tumors is oncologically safe. A locally manufactured, cost-effective implant provided consistent and predictable results after excision of the total femur with good functional outcomes.

  18. Cost Model for Digital Curation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01

    The Danish Ministry of Culture is currently funding a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project is to provide a basis for comparing and estimating future financial requirements...... for digital preservation and to increase cost effectiveness of digital preservation activities. In this study we describe an activity based costing methodology for digital preservation based on the OAIS Reference Model. In order to estimate the cost of digital migrations we have identified cost critical...

  19. Cost-Savings Analysis of the Better Beginnings, Better Futures Community-Based Project for Young Children and Their Families: A 10-Year Follow-up.

    Science.gov (United States)

    Peters, Ray DeV; Petrunka, Kelly; Khan, Shahriar; Howell-Moneta, Angela; Nelson, Geoffrey; Pancer, S Mark; Loomis, Colleen

    2016-02-01

    This study examined the long-term cost-savings of the Better Beginnings, Better Futures (BBBF) initiative, a community-based early intervention project for young children living in socioeconomically disadvantaged neighborhoods during their transition to primary school. A quasi-experimental, longitudinal two-group design was used to compare costs and outcomes for children and families in three BBBF project neighborhoods (n = 401) and two comparison neighborhoods (n = 225). A cost-savings analysis was conducted using all project costs for providing up to 4 years of BBBF programs when children were in junior kindergarten (JK) (4 years old) to grade 2 (8 years old). Data on 19 government service cost measures were collected from the longitudinal research sample from the time the youth were in JK through to grade 12 (18 years old), 10 years after ending project participation. The average family incremental net savings to government of providing the BBBF project was $6331 in 2014 Canadian dollars. When the BBBF monetary return to government as a ratio of savings to costs was calculated, for every dollar invested by the government, a return of $2.50 per family was saved. Findings from this study have important implications for government investments in early interventions focused on a successful transition to primary school as well as parenting programs and community development initiatives in support of children's development.

  20. Cost of goods sold and total cost of delivery for oral and parenteral vaccine packaging formats.

    Science.gov (United States)

    Sedita, Jeff; Perrella, Stefanie; Morio, Matt; Berbari, Michael; Hsu, Jui-Shan; Saxon, Eugene; Jarrahian, Courtney; Rein-Weston, Annie; Zehrung, Darin

    2018-03-14

    Despite limitations of glass packaging for vaccines, the industry has been slow to implement alternative formats. Polymer containers may address many of these limitations, such as breakage and delamination. However, the ability of polymer containers to achieve cost of goods sold (COGS) and total cost of delivery (TCOD) competitive with that of glass containers is unclear, especially for cost-sensitive low- and lower-middle-income countries. COGS and TCOD models for oral and parenteral vaccine packaging formats were developed based on information from subject matter experts, published literature, and Kenya's comprehensive multiyear plan for immunization. Rotavirus and inactivated poliovirus vaccines (IPV) were used as representative examples of oral and parenteral vaccines, respectively. Packaging technologies evaluated included glass vials, blow-fill-seal (BFS) containers, preformed polymer containers, and compact prefilled auto-disable (CPAD) devices in both BFS and preformed formats. For oral vaccine packaging, BFS multi-monodose (MMD) ampoules were the least expensive format, with a COGS of $0.12 per dose. In comparison, oral single-dose glass vials had a COGS of $0.40. BFS MMD ampoules had the lowest TCOD of oral vaccine containers at $1.19 per dose delivered, and ten-dose glass vials had a TCOD of $1.61 per dose delivered. For parenteral vaccines, the lowest COGS was achieved with ten-dose glass vials at $0.22 per dose. In contrast, preformed CPAD devices had the highest COGS at $0.60 per dose. Ten-dose glass vials achieved the lowest TCOD of the parenteral vaccine formats at $1.56 per dose delivered. Of the polymer containers for parenteral vaccines, BFS MMD ampoules achieved the lowest TCOD at $1.89 per dose delivered, whereas preformed CPAD devices remained the most expensive format, at $2.25 per dose delivered. Given their potential to address the limitations of glass and reduce COGS and TCOD, polymer containers deserve further consideration as alternative

  1. Externality costing for hydroelectric projects: Is it desirable? Is it possible?

    International Nuclear Information System (INIS)

    Bernier, L.

    1992-01-01

    The assignment of monetary values to environmental and social impacts of hydroelectric projects is discussed. The strengths and weaknesses of the economic approach to externality costing are noted. The problem to be faced is that environmental externalities associated with a hydro project very often involve resources that have little or no relation with the market, such as disturbances of land not used for commercial activities. The valuation of externalities related to thermal power plants is examined to provide lessons for quantifying the externalities of hydro projects. One observation is that there is very little information on the real impacts of such phenomena as the release of greenhouse gases, making quantification of their effect difficult; another is that impacts from atmospheric emissions are well in excess of simple deterioration of material goods or recreational activities that have some relationship to the market. Applied to hydro projects, the lessons from these observations indicate that there are no exact and homogeneous measurement units for impacts of actions such as diking or alteration of wildlife habitats. One approach that has been tried is the contingent valuation method, which relies on asking respondents how much they would pay to avoid an impact or risk. This approach is criticized and it is suggested to experiment with a review of the tradeoffs between several possible environmental impacts defined in a precise manner

  2. A project of reuse of reclaimed wastewater in the Po Valley, Italy: Polishing sequence and cost benefit analysis

    Science.gov (United States)

    Verlicchi, P.; Al Aukidy, M.; Galletti, A.; Zambello, E.; Zanni, G.; Masotti, L.

    2012-04-01

    SummaryThe paper presents a study carried out in the environmentally sensitive area of the Po Valley in northern Italy, with the aim of evaluating, from technical and economic perspectives, a project to reuse part of the final effluent from the Ferrara wastewater treatment plant for irrigation and to develop the site for recreational purposes. Although this area features plentiful supplies of surface water, the Ministry of the Environment has declared it to be at risk of environmental crises due to eutrophication and the drought recurring over the last decade. Thus the availability of fresh water, particularly for agricultural purposes, is threatened, and prompt water saving and protection measures are required. Hence, the possibility of reusing reclaimed wastewater from this plant was investigated, with the aim of exploiting the space around the WWTP, situated within a large urban park, to install natural polishing treatment systems and create green spaces for recreational use. Based on experimental investigation on a pilot plant (featuring both natural and conventional treatments), the study outlines the rationale behind the treatment train selected for the project, details the initial and ongoing costs involved, evaluates the benefits deriving from the project, and assesses public acceptance of the project by the contingent valuation method. A cost-benefit analysis completes the study, and various economic indicators (net present value, benefit-cost ratio, pay-back period, and internal rate of return) revealed that the proposed project was financially feasible.

  3. The Italian Tau/charm project

    Directory of Open Access Journals (Sweden)

    Biagini Maria Enrica

    2014-06-01

    Full Text Available A τ/charm Factory, an e + e- collider with very high luminosity at the 2–4.6 GeV center of mass energy, to be built on the Rome University at Tor Vergata campus, was studied by the Consortium Nicola Cabibbo Laboratory and the INFN Frascati Laboratories. This project is the natural evolution of the flagship Italian project SuperB Factory, funded by the Italian Government in 2010 with a budget that turned out to be insufficient to cover the total costs of the project. The study of rare events at the τ/charm energy was already planned as a Phase-II of SuperB [1]. This design keeps all the unique features of SuperB, including the polarization of the electron beam, with the possibility to take data in a larger energy range, with reduced accelerator dimensions and construction and operation costs. A Report on the accelerator design has been published in September 2013 [2].

  4. Examination of oil sands projects : gasification, CO{sub 2} emissions and supply costs

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, K. [Energy Resources Conservation Board, Calgary, AB (Canada)

    2008-10-15

    Non-conventional resources such as Alberta's oil sands are experiencing increased global interest because of the decline in global conventional oil and natural gas reserves. Bitumen extraction and upgrading is an energy intensive process. This paper provided a general discussion of Alberta's oil sands reserves, production and energy requirements. The paper discussed the application of different technologies to the oil sands, and in particular, the use of gasification as a method to produce bitumen-derived synthesis gas. Two oil sands projects currently under construction and implementing gasification technology were briefly described. The paper also provided a comparison of emission intensities from projects that employ gasification leading to a forecast of carbon dioxide equivalent emissions from the oil sands. The impact of Alberta's legislation and the federal framework on greenhouse gas emissions were also examined. Last, the paper discussed a supply cost methodology to compare an integrated extraction and upgrading project using gasification versus a similar project using a conventional steam methane reforming process (SMR). It was concluded that after comparing carbon dioxide emission intensities across different types of projects, the type of project that would be most heavily impacted by greenhouse gas emissions penalties was an in-situ extraction with an upgrading project that employed gasification technology. 36 refs., 5 tabs., 12 figs., 1 appendix.

  5. A review of the IEA/NEA Projected Costs of Electricity – 2015 edition

    International Nuclear Information System (INIS)

    Khatib, Hisham

    2016-01-01

    The IEA/NEA recently issued their eighth edition of the Study on the “Projected Costs of Generating Electricity” – 2015 edition. The Study is mainly concerned with calculating the levelised cost of electricity (LCOE). The LCOE calculations are based on a levelised average life time cost approach using the discounted cash flow (DCF) method. The analysis was this year, and for the first time, performed using three discount rates (3%, 7%, and 10%). The LCOE can serve as a tool for calculating the cost of different generation technologies. However the Study's usefulness is affected by its narrow base of a limited set of countries that are not necessarily representative. It ignored the negative role of subsidies and did not provide a methodology for selective application of the discount rates and costing of carbon. The global power generation scene is changing. Generation growth in OECD countries has become very limited; simultaneously there is rapid growth of varying renewables (VRE) generation which needs special criteria for assessing its system cost. All this demands a rethinking of the application and usefulness of the LCOE in future generation planning. - Highlights: • LCOE is a useful tool for economics of generation technologies. • The IEA/NEA study did not cover fully the required criteria for assessment. • It ignored interpretation of: the discount rate, carbon costing and subsidies. • The world energy scene is changing, this requires reassessment of LCOE.

  6. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  7. Total variation-based neutron computed tomography

    Science.gov (United States)

    Barnard, Richard C.; Bilheux, Hassina; Toops, Todd; Nafziger, Eric; Finney, Charles; Splitter, Derek; Archibald, Rick

    2018-05-01

    We perform the neutron computed tomography reconstruction problem via an inverse problem formulation with a total variation penalty. In the case of highly under-resolved angular measurements, the total variation penalty suppresses high-frequency artifacts which appear in filtered back projections. In order to efficiently compute solutions for this problem, we implement a variation of the split Bregman algorithm; due to the error-forgetting nature of the algorithm, the computational cost of updating can be significantly reduced via very inexact approximate linear solvers. We present the effectiveness of the algorithm in the significantly low-angular sampling case using synthetic test problems as well as data obtained from a high flux neutron source. The algorithm removes artifacts and can even roughly capture small features when an extremely low number of angles are used.

  8. Array automated assembly task low cost silicon solar array project. Phase 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Clayton

    1980-12-01

    The initial contract was a Phase II Process Development for a process sequence, but with concentration on two particular process steps: laserscribing and spray-on junction formation. The add-on portion of the contract was to further develop these tasks, to incorporate spray-on of AR Coating and aluminum and to study the application of microwave energy to solar cell fabrication. The overall process cost projection is 97.918 cents/Wp. The major contributor to this excess cost is the module encapsulation materials cost. During the span of this contract the study of microwave application to solar cell fabrication produced the ability to apply this technique to any requirement of 600/sup 0/C or less. Above this temperature, non-uniformity caused the processing to be unreliable. The process sequence is described in detail, and a SAMICS cost analysis for each valid process step studied is presented. A temporary catalog for expense items is included, and engineering specifications for the process steps are given. (WHK)

  9. External costs of material recycling strategies for fusion power plants

    International Nuclear Information System (INIS)

    Hallberg, B.; Aquilonius, K.; Lechon, Y.; Cabal, H.; Saez, R.M.; Schneider, T.; Lepicard, S.; Ward, D.; Hamacher, T.; Korhonen, R.

    2003-01-01

    This paper is based on studies performed within the framework of the project Socio-Economic Research on Fusion (SERF3). Several fusion power plant designs (SEAFP Models 1-6) were compared focusing on part of the plant's life cycle: environmental impact of recycling the materials. Recycling was considered for materials replaced during normal operation, as well as materials from decommissioning of the plant. Environmental impact was assessed and expressed as external cost normalised with the total electrical energy output during plant operation. The methodology used for this study has been developed by the Commission of the European Union within the frame of the ExternE project. External costs for recycling, normalised with the energy production during plant operation, are very low compared with those for other energy sources. Results indicate that a high degree of recycling is preferable, at least when considering external costs, because external costs of manufacturing of new materials and disposal costs are higher

  10. Assessment of external costs for transport project evaluation: Guidelines in some European countries

    Energy Technology Data Exchange (ETDEWEB)

    Petruccelli, Umberto, E-mail: umberto.petruccelli@unibas.it

    2015-09-15

    Many studies about the external costs generated by the transport system have been developed in the last twenty years. To standardize methodologies and assessment procedures to be used in the evaluation of the projects, some European countries recently have adopted specific guidelines that differ from each other in some aspects even sensibly. This paper presents a critical analysis of the British, Italian and German guidelines and is aimed at cataloguing the external cost types regarded and the assessment methods indicated as well as to highlight the differences of the results, in terms of applicability and reliability. The goal is to contribute to a European standardization process that would lead to the drafting of guidelines suited for all EU countries. - Highlights: • The analyzed guidelines agree on the methods to evaluate costs from air pollution, greenhouse gases and accidents. • They recommend respectively: dose-resp. approach; costs to reduce/permit emissions; whole direct, indirect and social costs. • For noise, DE guide indicates defensive expenditure or SP methods; IT guide, SP method; UK guide, the hedonic prices one. • For on territory impact, DE guide regards only the barrier effect; the IT one, also the soil consumption and system effects. • British guide proposes a qualitative methodology to estimate the impact on various landscapes and environments.

  11. Multi-objective optimization of discrete time-cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

    Science.gov (United States)

    Shahriari, Mohammadreza

    2016-06-01

    The time-cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate extra resources to short the finishing time of project and the project managers are intended to spend the lowest possible amount of money and achieve the maximum crashing time, as a result, both direct and indirect costs will be influenced in the project, and here, we are facing into the time value of money. It means that when we crash the starting activities in a project, the extra investment will be tied in until the end date of the project; however, when we crash the final activities, the extra investment will be tied in for a much shorter period. This study is presenting a two-objective mathematical model for balancing compressing the project time with activities delay to prepare a suitable tool for decision makers caught in available facilities and due to the time of projects. Also drawing the scheduling problem to real world conditions by considering nonlinear objective function and the time value of money are considered. The presented problem was solved using NSGA-II, and the effect of time compressing reports on the non-dominant set.

  12. Cost reduction of LWRs - The main features

    International Nuclear Information System (INIS)

    Board, J.A.; Norman, D.

    1991-01-01

    For effective generation cost reductions to be achieved while maintaining safety levels, the impact of each of the above element and their interactions must be fully assessed, together with the effects of uncertainty on commercial risk. the amount of interest during construction which must be paid can be minimised by adopting designs, output ratings (unit size), and construction methods which minimise construction time. However this must be done without unduly increasing specific capital cost. Total capital costs can be reduced by sharing design and project launching costs and front-end design and licensing costs, across a series of identical plants. The paper is reviewing costs and performance factors such as those above with the aim of identifying the strategies which might be necessary within and between countries in order to create an environment which would enable cost reductions on LWRs to be made. (author)

  13. 32 CFR 37.560 - Must I be able to estimate project expenditures precisely in order to justify use of a fixed...

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Must I be able to estimate project expenditures... I be able to estimate project expenditures precisely in order to justify use of a fixed-support TIA... purposes of this illustration, let that minimum recipient cost sharing be 40% of the total project costs...

  14. A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2012-01-01

    Full Text Available The aim of this study is to deal with a minimum cost network flow problem (MCNFP in a large-scale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an expectation multiobjective bilevel programming model with chance constraints is formulated to incorporate decision makers’ preferences. To solve the identified special conditions, an equivalent crisp model is proposed with an additional multiobjective bilevel particle swarm optimization (MOBLPSO developed to solve the model. The Shuibuya Hydropower Project is used as a real-world example to verify the proposed approach. Results and analysis are presented to highlight the performances of the MOBLPSO, which is very effective and efficient compared to a genetic algorithm and a simulated annealing algorithm.

  15. Cost-benefit analysis of copper recovery in remediation projects: A case study from Sweden.

    Science.gov (United States)

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Karlfeldt Fedje, Karin

    2017-12-15

    Contamination resulting from past industrial activity is a problem throughout the world and many sites are severely contaminated by metals. Advances in research in recent years have resulted in the development of technologies for recovering metal from metal-rich materials within the framework of remediation projects. Using cost-benefit analysis (CBA), and explicitly taking uncertainties into account, this paper evaluates the potential social profitability of copper recovery as part of four remediation alternatives at a Swedish site. One alternative involves delivery of copper-rich ash to a metal production company for refining. The other three alternatives involve metal leaching from materials and sale of the resulting metal sludge for its further processing at a metal production company using metallurgical methods. All the alternatives are evaluated relative to the conventional excavation and disposal method. Metal recovery from the ash, metal sludge sale, and disposal of the contaminated soil and the ash residue at the local landfill site, was found to be the best remediation alternative. However, given the present conditions, its economic potential is low relative to the conventional excavation and disposal method but higher than direct disposal of the copper-rich ash for refining. Volatile copper prices, the high cost of processing equipment, the highly uncertain cost of the metal leaching and washing process, coupled with the substantial project risks, contribute most to the uncertainties in the CBA results for the alternatives involving metal leaching prior to refining. However, investment in processing equipment within the framework of a long-term investment project, production of safe, reusable soil residue, and higher copper prices on the metal market, can make metal recovery technology socially profitable. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Development of a biogas planning tool for project owners

    DEFF Research Database (Denmark)

    Fredenslund, Anders Michael; Kjær, Tyge

    are considered: Combined heat and power and natural gas grid injection. The main input to the model is the amount and types of substrates available for anaerobic digestion. By substituting the models’ default values with more project specific information, the model can be used in a biogas projects later phases......A spreadsheet model was developed, which can be used as a tool in the initial phases of planning a centralized biogas plant in Denmark. The model assesses energy production, total plant costs, operational costs and revenues and effect on greenhouse gas emissions. Two energy utilization alternatives...

  17. 75 FR 5315 - Boulder Canyon Project-Rate Order No. WAPA-150

    Science.gov (United States)

    2010-02-02

    ..., and uprating program payments. The total costs are offset by the projected revenue from water sales, visitor center, water pump energy sales, facilities use charges, regulation, reactive supply and voltage...

  18. Low cost Czochralski crystal growing technology. Near implementation of the flat plate photovoltaic cost reduction of the low cost solar array project

    Science.gov (United States)

    Roberts, E. G.

    1980-01-01

    Equipment developed for the manufacture of over 100 kg of silicon ingot from one crucible by rechanging from another crucible is described. Attempts were made to eliminate the cost of raising the furnace temperature to 250 C above the melting point of silicon by using an RF coil to melt polycrystalline silicon rod as a means of rechanging the crucible. Microprocessor control of the straight growth process was developed and domonstrated for both 4 inch and 6 inch diameter. Both meltdown and melt stabilization processes were achieved using operator prompting through the microprocessor. The use of the RF work coil in poly rod melting as a heat sink in the accelerated growth process was unsuccessful. The total design concept for fabrication and interfacing of the total cold crucible system was completed.

  19. Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

    Science.gov (United States)

    Spremo, Stevan; Bregman, Jesse; Dallara, Christopher D.; Ghassemieh, Shakib M.; Hanratty, James; Jackson, Evan; Kitts, Christopher; Klupar, Pete; Lindsay, Michael; Ignacio, Mas; hide

    2009-01-01

    The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained

  20. Weighing the Costs and Benefits of Renewables Portfolio Standards:A Comparative Analysis of State-Level Policy Impact Projections

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Cliff; Wiser, Ryan; Bolinger, Mark

    2007-01-16

    State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have substantial impacts on electricity markets, ratepayers, and local economies. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on projecting cost impacts, but sometimes also estimating macroeconomic and environmental effects. This report synthesizes and analyzes the results and methodologies of 28 distinct state or utility-level RPS cost impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 18 different states. We highlight the key findings of these studies on the costs and benefits of RPS policies, examine the sensitivity of projected costs to model assumptions, assess the attributes of different modeling approaches, and suggest possible areas of improvement for future RPS analysis.

  1. Cheap-GSHPs, an European project aiming cost-reducing innovations for shallow geothermal installations. - Geological data reinterpretation

    Science.gov (United States)

    Bertermann, David; Müller, Johannes; Galgaro, Antonio; Cultrera, Matteo; Bernardi, Adriana; Di Sipio, Eloisa

    2016-04-01

    The success and widespread diffusion of new sustainable technologies are always strictly related to their affordability. Nowadays the energy price fluctuations and the economic crisis are jeopardizing the development and diffusion of renewable technologies and sources. With the aim of both reduce the overall costs of shallow geothermal systems and improve their installation safety, an European project has took place recently, under the Horizon 2020 EU Framework Programme for Research and Innovation. The acronym of this project is Cheap-GSHPs, meaning "cheap and efficient application of reliable ground source heat exchangers and pumps"; the CHEAP-GSHPs project involves 17 partners among 9 European countries such Belgium, France, Germany, Greece, Ireland, Italy, Romania, Spain, Switzerland. In order to achieve the planned targets, an holistic approach is adopted, where all involved elements that take part of shallow geothermal activities are here integrated. In order to reduce the drilling specific costs and for a solid planning basis the INSPIRE-conformal ESDAC data set PAR-MAT-DOM ("parent material dominant") was analysed and reinterpreted regarding the opportunities for cost reductions. Different ESDAC classification codes were analysed lithologically and sedimentologically in order to receive the most suitable drilling technique within different formations. Together with drilling companies this geological data set was translated into a geotechnical map which allows drilling companies the usage of the most efficient drilling within a certain type of underground. The scale of the created map is 1: 100,000 for all over Europe. This leads to cost reductions for the final consumers. Further there will be the definition of different heat conductivity classes based on the reinterpreted PAR-MAT-DOM data set which will provide underground information. These values will be reached by sampling data all over Europe and literature data. The samples will be measured by several

  2. State-level medical and absenteeism cost of asthma in the United States.

    Science.gov (United States)

    Nurmagambetov, Tursynbek; Khavjou, Olga; Murphy, Louise; Orenstein, Diane

    2017-05-01

    For medically treated asthma, we estimated prevalence, medical and absenteeism costs, and projected medical costs from 2015 to 2020 for the entire population and separately for children in the 50 US states and District of Columbia (DC) using the most recently available data. We used multiple data sources, including the Medical Expenditure Panel Survey, U.S. Census Bureau, Kaiser Family Foundation, Medical Statistical Information System, and Current Population Survey. We used a two-part regression model to estimate annual medical costs of asthma and a negative binomial model to estimate annual school and work days missed due to asthma. Per capita medical costs of asthma ranged from $1,860 (Mississippi) to $2,514 (Michigan). Total medical costs of asthma ranged from $60.7 million (Wyoming) to $3.4 billion (California). Medicaid costs ranged from $4.1 million (Wyoming) to $566.8 million (California), Medicare from $5.9 million (DC) to $446.6 million (California), and costs paid by private insurers ranged from $27.2 million (DC) to $1.4 billion (California). Total annual school and work days lost due to asthma ranged from 22.4 thousand (Wyoming) to 1.5 million days (California) and absenteeism costs ranged from $4.4 million (Wyoming) to $345 million (California). Projected increase in medical costs from 2015 to 2020 ranged from 9% (DC) to 34% (Arizona). Medical and absenteeism costs of asthma represent a significant economic burden for states and these costs are expected to rise. Our study results emphasize the urgency for strategies to strengthen state level efforts to prevent and control asthma attacks.

  3. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  4. A cost-benefit analysis of The National Map

    Science.gov (United States)

    Halsing, David L.; Theissen, Kevin; Bernknopf, Richard

    2003-01-01

    The Geography Discipline of the U.S. Geological Survey (USGS) has conducted this cost-benefit analysis (CBA) of The National Map. This analysis is an evaluation of the proposed Geography Discipline initiative to provide the Nation with a mechanism to access current and consistent digital geospatial data. This CBA is a supporting document to accompany the Exhibit 300 Capital Asset Plan and Business Case of The National Map Reengineering Program. The framework for estimating the benefits is based on expected improvements in processing information to perform any of the possible applications of spatial data. This analysis does not attempt to determine the benefits and costs of performing geospatial-data applications. Rather, it estimates the change in the differences between those benefits and costs with The National Map and the current situation without it. The estimates of total costs and benefits of The National Map were based on the projected implementation time, development and maintenance costs, rates of data inclusion and integration, expected usage levels over time, and a benefits estimation model. The National Map provides data that are current, integrated, consistent, complete, and more accessible in order to decrease the cost of implementing spatial-data applications and (or) improve the outcome of those applications. The efficiency gains in per-application improvements are greater than the cost to develop and maintain The National Map, meaning that the program would bring a positive net benefit to the Nation. The average improvement in the net benefit of performing a spatial data application was multiplied by a simulated number of application implementations across the country. The numbers of users, existing applications, and rates of application implementation increase over time as The National Map is developed and accessed by spatial data users around the country. Results from the 'most likely' estimates of model parameters and data inputs indicate that

  5. Benefit-cost analysis of fishery rehabilitation projects: A Great Lakes case study. Spec. issue: Responses to marine resource change/social sciences perspective

    Science.gov (United States)

    Bishop, R.C.; Milliman, S.R.; Boyle, K.J.; Johnson, B.L.

    1990-01-01

    Tools of benefit-cost analysis are used to evaluate a project to rehabilitate the yellow perch (Perca flavescens ) fishery of Green Bay, Wisconsin. Both sport and commercial fishers harvest from this stock, which has been suffering from much reduced productivity since the early 1960s. The project is composed of commercial quotas and other regulations. Measures of benefits and costs were used that explicitly incorporate uncertainly about the potential level of success of the project. The analysis shows that commercial fish producers will more or less break even compared to where they would have been without the project, but that substantial recreational benefits can be expected.

  6. The Optimization of the Time-Cost Tradeoff Problem in Projects with Conditional Activities Using of the Multi-Objective Charged System Search Algorithm (SMOCSS

    Directory of Open Access Journals (Sweden)

    M. K. Sharbatdar

    2016-11-01

    Full Text Available Abstract The appropriate planning and scheduling for reaching the project goals in the most economical way is the very basic issue of the project management. As in each project, the project manager must determine the required activities for the implementation of the project and select the best option in the implementation of each of the activities, in a way that the least final cost and time of the project is achieved. Considering the number of activities and selecting options for each of the activities, usually the selection has not one unique solution, but it consists of a set of solutions that are not preferred to each other and are known as Pareto solutions. On the other hand, in some actual projects, there are activities that their implementation options depend on the implementation of the prerequisite activity and are not applicable using all the implementation options, and even in some cases the implementation or the non-implementation of some activities are also dependent on the prerequisite activity implementation. These projects can be introduced as conditional projects. Much researchs have been conducted for acquiring Pareto solution set, using different methods and algorithms, but in all the done tasks the time-cost optimization of conditional projects is not considered. Thus, in the present study the concept of conditional network is defined along with some practical examples, then an appropriate way to illustrate these networks and suitable time-cost formulation of these are presented. Finally, for some instances of conditional activity networks, conditional project time-cost optimization conducted multi-objectively using known meta-heuristic algorithms such as multi-objective genetic algorithm, multi-objective particle swarm algorithm and multi-objective charged system search algorithm.

  7. The Commission of European Communities project 'mirage' (migration of radionuclides in the geosphere)

    International Nuclear Information System (INIS)

    Come, B.

    1984-01-01

    The co-ordinated project 'MIRAGE' on Migration of Radionuclides in the Geosphere corresponds to the follow-up, from 1983 onwards, of the present activities of the laboratories of the Member States, up to the end of 1984, and of the Joint Research Centre at Ispra, up to the end of 1983. It is concentrated upon the study of the transfer of radioactivity from conditioned waste through the different barriers up to the interface between the geosphere and the biosphere. The MIRAGE project is performed in the framework of the Commission of European Communities (CEC) indirect action programme on Management and Storage of Radioactive Waste, sub-programme Undergound Disposal, and of the CEC direct action programme on Safety of Nuclear Materials at the Joint Research Centre, Ispra Establishment. The total financial commitment in this project is at present 6,384,000 ECU for 1983 and 1984 and the Commission participates financially in each study selected on a cost-sharing basis to a level of about 40% of the total cost. The costs of the studies performed at JRC-Ispra are not included in this amount. The number of organizations, firms and laboratories involved in this project comes to about 40

  8. Utility-Scale Solar 2016: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Seel, Joachim; LaCommare, Kristina Hamachi

    2017-09-19

    The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scale PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These

  9. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    International Nuclear Information System (INIS)

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.; Urdangaray, R.

    2013-01-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  10. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    Energy Technology Data Exchange (ETDEWEB)

    Sanford, P.C. [Consultant, 11221 E. Cimmarron Dr., Englewood, CO 80111 (United States); Moe, M.A. [EMCBC Office of Cost Estimating and Analysis, United States Department of Energy, 250 E. 5th Street, Suite 500, Cincinnati, OH 45202 (United States); Hombach, W.G. [Team Analysis, Inc., 2 Cardinal Park Drive, Suite 105A, Leesburg, VA 20175 (United States); Urdangaray, R. [Project Performance Corporation, 1760 Old Meadow Road, McLean, VA 22102 (United States)

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  11. ERP adoption cost factors identification and classification: a study in SMEs

    Directory of Open Access Journals (Sweden)

    Moutaz Haddara

    2013-01-01

    Full Text Available Enterprise resource planning (ERP systems adoptions require substantial resources and investments. The majority of businesses around the globe can be considered to be small and medium sized enterprises (SMEs. Thus, SMEs are seen to be typical companies that are the cornerstone of most economies. Compared with large enterprises, an SME-context contains several characteristics, and scarcity of resources is among the top of them. For SMEs, unplanned costs escalation could pose a serious threat to their stability and survival in the market. Frequently, ERP projects have crossed their estimated budgets and schedules. Researchers and practitioners state that a prevailing number of ERP adoption projects fail due to inaccurate or to too optimistic budgets/schedules. In addition, many organizations face difficulties in identifying the potential cost factors that could occur during their ERP adoption lifecycle. While focusing on the SME-context, this research attempts to identify potential costs that could occur in ERP adoptions. The research method employed in this study targeted diverse stakeholders and experts involved in ERP projects in Egypt. This research provides a list of cost factors and their classifications that could aid adopting organizations to better estimate their needed ERP project budgets. In particular, this research explores the direct and indirect cost factors that occur in ERP adoptions in Egyptian SMEs. Also, this study investigates the influence of some SME-specific contextual factors on costs. Moreover, the paper provides a ranking of cost factors according to their impact on total adoption costs.

  12. Doubling the Performance-Cost Ratio of PV by Using Cheap Mirrors - a Secondary School Project

    NARCIS (Netherlands)

    Breejen, H.; van Herwaarden, S.; Keijsers, B.; van Dijk, V.A.P.; van Sark, W.G.J.H.M.|info:eu-repo/dai/nl/074628526

    2007-01-01

    Reduction of cost is a major issue in the photovoltaics field. We have addressed this issue in a secondaryschool science project by considering the use of cheap mirrors in combination with solar panels, for application in developing countries. We have confirmed that it is possible to increase the

  13. Cost Model for Digital Preservation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2011-01-01

    The Danish Ministry of Culture has funded a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project was to increase cost effectiveness of digital preservation activities and to provide a basis...... for comparing and estimating future cost requirements for digital preservation. In this study we describe an activity-based costing methodology for digital preservation based on the Open Archice Information System (OAIS) Reference Model. Within this framework, which we denote the Cost Model for Digital...... Preservation (CMDP), the focus is on costing the functional entity Preservation Planning from the OAIS and digital migration activities. In order to estimate these costs we have identified cost-critical activities by analysing the functions in the OAIS model and the flows between them. The analysis has been...

  14. Cutting costs by achieving energy efficiency using monitoring, targeting and teamwork

    Energy Technology Data Exchange (ETDEWEB)

    Dittburner, D. [Unilever Canada, Toronto, ON (Canada)

    2004-07-01

    Unilever is a world leader of consumer goods with annual sales of $70 billion. This paper focuses on energy management projects developed at Unilever's Rexdale Plant, where 180 million pounds of edible oils and margarine are produced annually. The project is a response to corporate and market pressures to reduce costs. An overview of Unilever's relationship with Natural Resources Canada was provided. Results of the overall project were highlighted and included: $3 million in annual savings from increased efficiency in operations and equipment retrofits. An outline of the energy team at Unilever was presented, with their mission statement, rules and achievements, as well the company's overall goal of total productive manufacturing. A list of awards and financial incentives was presented, as well as details of financial savings incurred at the Rexdale Plant. Total energy reductions were presented, with a natural gas year to year comparison and utility to production ratios from 1999 to the present. A statement concerning the issue of corporate support by the vice president was provided. Seven steps to savings were presented, as well as details of the company's implementation of the steps. Details of the extended team involved in the project were provided, as well as extensive details about the employee awareness program instigated by the company, including a database of ideas achieved since 2001, as well as details of specific projects accomplished, with estimated savings for each project. An outline of the company's business model and methodology was presented, along with details of reduced costs, risk and improved management and communications. An outline of scoping studies was presented as well as a flow chart of projects and target-setting goals. Success factors were reviewed. Montage applications included energy management; performance contracting; energy forecasting; emissions and waste minimization; and cost allocation. tabs., figs.

  15. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Science.gov (United States)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  16. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  17. A tutorial on activity-based costing of electronic health records.

    Science.gov (United States)

    Federowicz, Marie H; Grossman, Mila N; Hayes, Bryant J; Riggs, Joseph

    2010-01-01

    As the American Recovery and Restoration Act of 2009 allocates $19 billion to health information technology, it will be useful for health care managers to project the true cost of implementing an electronic health record (EHR). This study presents a step-by-step guide for using activity-based costing (ABC) to estimate the cost of an EHR. ABC is a cost accounting method with a "top-down" approach for estimating the cost of a project or service within an organization. The total cost to implement an EHR includes obvious costs, such as licensing fees, and hidden costs, such as impact on productivity. Unlike other methods, ABC includes all of the organization's expenditures and is less likely to miss hidden costs. Although ABC is used considerably in manufacturing and other industries, it is a relatively new phenomenon in health care. ABC is a comprehensive approach that the health care field can use to analyze the cost-effectiveness of implementing EHRs. In this article, ABC is applied to a health clinic that recently implemented an EHR, and the clinic is found to be more productive after EHR implementation. This methodology can help health care administrators assess the impact of a stimulus investment on organizational performance.

  18. Cost Forecasting of Substation Projects Based on Cuckoo Search Algorithm and Support Vector Machines

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available Accurate prediction of substation project cost is helpful to improve the investment management and sustainability. It is also directly related to the economy of substation project. Ensemble Empirical Mode Decomposition (EEMD can decompose variables with non-stationary sequence signals into significant regularity and periodicity, which is helpful in improving the accuracy of prediction model. Adding the Gauss perturbation to the traditional Cuckoo Search (CS algorithm can improve the searching vigor and precision of CS algorithm. Thus, the parameters and kernel functions of Support Vector Machines (SVM model are optimized. By comparing the prediction results with other models, this model has higher prediction accuracy.

  19. An analysis of decommissioning costs

    International Nuclear Information System (INIS)

    Teunckens, L.; Loeschhorn, U.; Yanagihara, S.; Wren, G.; Menon, S.

    1992-01-01

    Within the OECD/NEA Cooperative Programme on Decommissioning a Task Group was set up early in 1989 to identify the reasons for the large variations in decommissioning cost estimates. The Task Group gathered cost data from 12 of the 14 projects in the Programme to form the basis of their analysis. They included reactors being decommissioned to various stages as well as fuel cycle facilities. The projects were divided into groups of projects with similar characteristics ('models') to facilitate the analysis of the cost distribution in each group of projects and the cost data was progressively refined by a dialogue between the Task Group and the project managers. A comparative analysis was then performed and project specific discrepancies were identified. The Task Group's report is summarized on the results of the comparative analysis as well as the lessons learnt by the Task Group in the acquisition and analysis of cost data from international decommissioning projects. (author) 5 tabs

  20. Reducing Design Cycle Time and Cost Through Process Resequencing

    Science.gov (United States)

    Rogers, James L.

    2004-01-01

    In today's competitive environment, companies are under enormous pressure to reduce the time and cost of their design cycle. One method for reducing both time and cost is to develop an understanding of the flow of the design processes and the effects of the iterative subcycles that are found in complex design projects. Once these aspects are understood, the design manager can make decisions that take advantage of decomposition, concurrent engineering, and parallel processing techniques to reduce the total time and the total cost of the design cycle. One software tool that can aid in this decision-making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). The DeMAID software minimizes the feedback couplings that create iterative subcycles, groups processes into iterative subcycles, and decomposes the subcycles into a hierarchical structure. The real benefits of producing the best design in the least time and at a minimum cost are obtained from sequencing the processes in the subcycles.

  1. Optimizing Data Centre Energy and Environmental Costs

    Science.gov (United States)

    Aikema, David Hendrik

    Data centres use an estimated 2% of US electrical power which accounts for much of their total cost of ownership. This consumption continues to grow, further straining power grids attempting to integrate more renewable energy. This dissertation focuses on assessing and reducing data centre environmental and financial costs. Emissions of projects undertaken to lower the data centre environmental footprints can be assessed and the emission reduction projects compared using an ISO-14064-2-compliant greenhouse gas reduction protocol outlined herein. I was closely involved with the development of the protocol. Full lifecycle analysis and verifying that projects exceed business-as-usual expectations are addressed, and a test project is described. Consuming power when it is low cost or when renewable energy is available can be used to reduce the financial and environmental costs of computing. Adaptation based on the power price showed 10--50% potential savings in typical cases, and local renewable energy use could be increased by 10--80%. Allowing a fraction of high-priority tasks to proceed unimpeded still allows significant savings. Power grid operators use mechanisms called ancillary services to address variation and system failures, paying organizations to alter power consumption on request. By bidding to offer these services, data centres may be able to lower their energy costs while reducing their environmental impact. If providing contingency reserves which require only infrequent action, savings of up to 12% were seen in simulations. Greater power cost savings are possible for those ceding more control to the power grid operator. Coordinating multiple data centres adds overhead, and altering at which data centre requests are processed based on changes in the financial or environmental costs of power is likely to increase this overhead. Tests of virtual machine migrations showed that in some cases there was no visible increase in power use while in others power use

  2. Cost-Effectiveness Analysis of Total Hip Arthroplasty Performed by a Canadian Short-Stay Surgical Team in Ecuador.

    Science.gov (United States)

    Schlegelmilch, Michael; Rashiq, Saifee; Moreau, Barbara; Jarrín, Patricia; Tran, Bach; Chuck, Anderson

    2017-01-01

    Few charitable overseas surgical missions produce cost-effectiveness analyses of their work. We compared the pre- and postoperative health status for 157 total hip arthroplasty (THA) patients operated on from 2007 to 2011 attended by an annual Canadian orthopedic mission to Ecuador to determine the quality-adjusted life years (QALYs) gained. The costs of each mission are known. The cost per surgery was divided by the average lifetime QALYs gained to estimate an incremental cost-effectiveness ratio (ICER) in Canadian dollars per QALY. The average lifetime QALYs (95% CI) gained were 1.46 (1.4-1.5), 2.5 (2.4-2.6), and 2.9 (2.7-3.1) for unilateral, bilateral, and staged (two THAs in different years) operations, respectively. The ICERs were $4,442 for unilateral, $2,939 for bilateral, and $4392 for staged procedures. Seventy percent of the mission budget was spent on the transport and accommodation of volunteers. THA by a Canadian short-stay surgical team was highly cost-effective, according to criteria from the National Institute for Health and Care Excellence and the World Health Organization. We encourage other international missions to provide similar cost-effectiveness data to enable better comparison between mission types and between mission and nonmission care.

  3. Personality and Total Health Through Life Project Eye Substudy: Methodology and Baseline Retinal Features.

    Science.gov (United States)

    Wijngaarden, Peter Van; Keel, Stuart; Hodgson, Lauren A B; Kumar, Dinesh K; Aliahmad, Behzad; Paim, Cistiane C; Kiely, Kim M; Cherbuin, Nicolas; Anstey, Kaarin J; Dirani, Mohamed

    2017-01-01

    To describe the methodology and present the retinal grading findings of an older sample of australians with well-defined indices of neurocognitive function in the Personality and total Health (PATH) through life project. A cross-sectional study. Three hundred twenty-six individuals from the PatH through life project were invited to participate. Participants completed a general questionnaire and 2-field, 45-degree nonmydriatic color digital retinal photography. Photographs were graded for retinal pathology according to established protocols. Two hundred fifty-four (77.9%) subjects, aged 72 to 78 years, agreed to participate in the eye substudy. gradable images of at least 1 eye were acquired in 211 of 254 subjects (83.1%). retinal photographic screening identified 1 or more signs of pathology in 130 of the 174 subjects (74.7%) with gradable images of both eyes. a total of 45 participants (17.7%) had self-reported diabetes and diabetic retinopathy was observed in 22 (48.9%) of these participants. This well-defined sample of older australians provides a unique opportunity to interrogate associations between retinal findings, including retinal vascular geometric parameters, and indices of neurocognitive function. Copyright 2017 Asia-Pacific Academy of Ophthalmology.

  4. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  5. Costs and cost-effectiveness of carotid stenting versus endarterectomy for patients at standard surgical risk: results from the Carotid Revascularization Endarterectomy Versus Stenting Trial (CREST).

    Science.gov (United States)

    Vilain, Katherine R; Magnuson, Elizabeth A; Li, Haiyan; Clark, Wayne M; Begg, Richard J; Sam, Albert D; Sternbergh, W Charles; Weaver, Fred A; Gray, William A; Voeks, Jenifer H; Brott, Thomas G; Cohen, David J

    2012-09-01

    The Carotid Revascularization Endarterectomy versus Stenting Trial (CREST) demonstrated similar rates of the primary composite end point between carotid artery stenting (CAS) and carotid endarterectomy (CEA), although the risk of stroke was higher with CAS, and the risk of myocardial infarction was higher with CEA. Given the large number of patients who are candidates for these procedures, an understanding of their relative cost and cost-effectiveness may have important implications for health care policy and treatment guidelines. We performed a formal economic evaluation alongside the CREST trial. Costs were estimated from all trial participants over the first year of follow-up using a combination of resource use data and hospital billing data. Patient-level health use scores were obtained using data from the SF-36. We then used a Markov disease-simulation model calibrated to the CREST results to project 10-year costs and quality-adjusted life expectancy for the 2 treatment groups. Although initial procedural costs were $1025/patient higher with CAS, postprocedure costs and physician costs were lower such that total costs for the index hospitalization were similar for the CAS and CEA groups ($15 055 versus $14 816; mean difference, $239/patient; 95% CI for difference, -$297 to $775). Neither follow-up costs after discharge nor total 1-year costs differed significantly. For the CREST population, model-based projections over a 10-year time horizon demonstrated that CAS would result in a mean incremental cost of $524/patient and a reduction in quality-adjusted life expectancy of 0.008 years compared with CEA. Probabilistic sensitivity analysis demonstrated that CEA was economically attractive at an incremental cost-effectiveness threshold of $50 000/quality-adjusted life-year gained in 54% of samples, whereas CAS was economically attractive in 46%. Despite slightly lower in-trial costs and lower rates of stroke with CEA compared with CAS, projected 10-year outcomes

  6. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  7. Alizes: Wind pumping project in Mauritania

    International Nuclear Information System (INIS)

    Monvois, J.; Reboulet, M.

    1991-01-01

    GRET started the title project in May 1990. About 50,000 people live in the area around Rosso, Mauritania, where the project is located. An essential aspect of the project is that villagers themselves need to ask for a wind pump. Moreover, the wind pumps are locally manufactured by a small enterprise. The counterparts are the Mauritanian Ministry of Energy, and the non-gouvernmental Institute Dello and Espace Eolien Regional in France. The Oasis multibladed windmill (2,5 diameter) was chosen, because it is easy to manufacture, it is easy to maintain and quite cheap. To avoid problems it is decided not to pump water from a depth more than 20 meters. The total costs of a wind pump amount to approximately US$ 8,000. for obtaining a wind pump, the villagers need to pay 15% of this total amount. 5 figs., 1 tab

  8. Chapter 17. Engineering cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    Higbee, Charles V.

    1998-01-01

    In the early 1970s, life cycle costing (LCC) was adopted by the federal government. LCC is a method of evaluating all the costs associated with acquisition, construction and operation of a project. LCC was designed to minimize costs of major projects, not only in consideration of acquisition and construction, but especially to emphasize the reduction of operation and maintenance costs during the project life. Authors of engineering economics texts have been very reluctant and painfully slow to explain and deal with LCC. Many authors devote less than one page to the subject. The reason for this is that LCC has several major drawbacks. The first of these is that costs over the life of the project must be estimated based on some forecast, and forecasts have proven to be highly variable and frequently inaccurate. The second problem with LCC is that some life span must be selected over which to evaluate the project, and many projects, especially renewable energy projects, are expected to have an unlimited life (they are expected to live for ever). The longer the life cycle, the more inaccurate annual costs become because of the inability to forecast accurately.

  9. Transmission avoided cost: a new parameter to evaluate the economic competitiveness of generations plants projects

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, D S [Companhia Energetica de Sao Paulo, SP (Brazil); Albuquerque, J C.R.; Rosenblat, J [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The paper presents a new formulation that makes feasible a composition of long run production marginal costs with the long run transmission marginal costs, including the costs related to the interconnection EHV networks and that related to the voltage levels below. The goal top be attained is to have available a more adequate parameter in order to compare production cost related to a plant, that will be connected to a certain voltage level network, to the cost related supplying the sam,e amount of energy from the bulk power system which will be represented by the marginal costs up to the voltage level under consideration. This procedure brings to light the Transmission Avoided Costs concepts, that are stressed throughout the text. The proposed methodology is now being used, in the brazilian Power Sector, as a rule of thumb in order to guide planning decisions about the schedule of new plants that have installed capacity below 30 MW. For plants with higher capacity, the transmission avoided costs are evaluated for each specific case, simulating the system behavior without the quoted hydroelectric plant. This paper focuses, an an application example, the case of the Canoas Hydroelectric Project, recently included in the Generation Expansion Reference Plan after a detailed analysis supported by the methodology described here. (author) 7 refs., 3 tabs.

  10. The Navy Needs More Comprehensive Guidance for Evaluating and Supporting CostEffectiveness of LargeScale Renewable Energy Projects (REDACTED)

    Science.gov (United States)

    2016-08-25

    parameters affecting the maximum solar photovoltaic system sizes were part of the design requirements and covered in the terms of the contract previously...Solar Multiple Award Contract Brown Power Cost (NPV) Photovoltaic Systems Electricity Cost (NPV) Total Savings (NPV) Minimum Production...to the nearest tenth. Totals may not equal the actual sum because of rounding. 13 Photovoltaic systems are solar electric systems made up of several

  11. Projected cost comparison of nuclear electricity

    International Nuclear Information System (INIS)

    Juhn, P.E.; Hu, C.W.

    2000-01-01

    Comparison of electricity generation costs has been done in the late years through a large co-operation between several organisations. The studies are aiming to provide reliable comparison of electricity generating costs of nuclear and conventional base load power plants. This paper includes the result of the joint IAEA/OECD study published in 1997. (author)

  12. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  13. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  14. Calculating utility prudency issue costs

    International Nuclear Information System (INIS)

    Nielsen, K.R.

    1985-01-01

    The nuclear industry, particularly utilities and their construction, engineering and vendor agents, is faced with a surging increase in prudency management audits. What started as primarily a nuclear project-oriented requirement has spread to encompass most significant utility capital construction projects. Such audits are often a precedent condition to commencement of rate hearings. The cost engineer, a primary major capital construction project participant, is required to develop or critique ''prudency issue'' costs as part of such audits. Although utility costs in the broadest sense are potentially at issue, this paper concentrates on the typical project/construction management costs. The costs of design, procurement and construction are all subject to the calculation process

  15. Procedures for initiation, cost-sharing and management of OECD projects in nuclear safety

    International Nuclear Information System (INIS)

    2002-01-01

    , finances and management should be considered in order to accommodate requirements and boundary conditions that might differ from case to case. Flexibility might include consideration of in-kind contributions when applicable for project furtherance. This proposal is primarily concerned with projects that are organised by the NEA secretariat upon CSNI recommendations and initiative. One should also notice that the NEA Nuclear Safety Division has for some time operated a database on common cause events denominated ICDE. Two additional databases, one on fire events (FIRE database) and one on piping failure (OPDE database) have started in 2002. They are smaller projects, which do not have a host country. These procedures apply also to these projects, with the exception that, for the latter ones, costs are equally shared among participants

  16. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  17. Final Report - Stationary and Emerging Market Fuel Cell System Cost Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Contini, Vince [Battelle Memorial Inst., Columbus, OH (United States); Heinrichs, Mike [Battelle Memorial Inst., Columbus, OH (United States); George, Paul [Battelle Memorial Inst., Columbus, OH (United States); Eubanks, Fritz [Battelle Memorial Inst., Columbus, OH (United States); Jansen, Mike [Battelle Memorial Inst., Columbus, OH (United States); Valluri, Manoj [Battelle Memorial Inst., Columbus, OH (United States); Mansouri, Mahan [Battelle Memorial Inst., Columbus, OH (United States); Swickrath, Mike [Battelle Memorial Inst., Columbus, OH (United States)

    2017-04-30

    The U.S. Department of Energy (DOE) is focused on providing a portfolio of technology solutions to meet energy security challenges of the future. Fuel cells are a part of this portfolio of technology offerings. To help meet these challenges and supplement the understanding of the current research, Battelle has executed a five-year program that evaluated the total system costs and total ownership costs of two technologies: (1) an ~80 °C polymer electrolyte membrane fuel cell (PEMFC) technology and (2) a solid oxide fuel cell (SOFC) technology, operating with hydrogen or reformate for different applications. Previous research conducted by Battelle, and more recently by other research institutes, suggests that fuel cells can offer customers significant fuel and emission savings along with other benefits compared to incumbent alternatives. For this project, Battelle has applied a proven cost assessment approach to assist the DOE Fuel Cell Technologies Program in making decisions regarding research and development, scale-up, and deployment of fuel cell technology. The cost studies and subsequent reports provide accurate projections of current system costs and the cost impact of state-of-the-art technologies in manufacturing, increases in production volume, and changes to system design on system cost and life cycle cost for several near-term and emerging fuel cell markets. The studies also provide information on types of manufacturing processes that must be developed to commercialize fuel cells and also provide insights into the optimization needed for use of off-the-shelf components in fuel cell systems. Battelle’s analysis is intended to help DOE prioritize investments in research and development of components to reduce the costs of fuel cell systems while considering systems optimization.

  18. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  19. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment