  1. Beam heating requirements for a tokamak experimental power reactor

    International Nuclear Information System (INIS)

    Bertoncini, P.J.; Brooks, J.N.; Fasolo, J.A.; Stacey, W.M. Jr.

    1976-01-01

    Typical beam heating requirements for effective tokamak experimental power reactor (TEPR) operation have been studied in connection with the Argonne preliminary conceptual TEPR design. For an ignition level plasma (approximately 100 MWt fusion power) for the nominal case envisioned, the neutral beam is only used to heat the plasma to ignition. This typically requires a beam power output of 40 MW at 180 keV for about 3 sec with a total energy of 114 MJ supplied to the plasma. The beam requirements for an ignition device are not very sensitive to changes in wall-sputtered impurity levels or plasma resistivity. For a plasma that must be driven due to poor confinement, the beam must remain on for most of the burn cycle. For representative cases, beam powers of approximately 23 MW are required for a total on-time of 20 to 50 sec. Reqirements on power level, beam energy, on-time, and beam-generation efficiency all represent considerable advances over present technology. For the Argonne TEPR design, a total of 16 to 32 beam injectors is envisioned. For a 40-MW, 180-keV, one-component beam, each injector supplies about 7 to 14 A of neutrals to the plasma. For positive ion sources, about 50 to 100 A of ions are required per injector and some form of particle and/or energy recycling appears to be essential in order to meet the power and efficiency requirements

  2. Probabilistic safety analysis of DC power supply requirements for nuclear power plants. Technical report

    International Nuclear Information System (INIS)

    Baranowsky, P.W.; Kolaczkowski, A.M.; Fedele, M.A.

    1981-04-01

    A probabilistic safety assessment was performed as part of the Nuclear Regulatory Commission generic safety task A-30, Adequacy of Safety Related DC Power Supplies. Event and fault tree analysis techniques were used to determine the relative contribution of DC power related accident sequences to the total core damage probability due to shutdown cooling failures. It was found that a potentially large DC power contribution could be substantially reduced by augmenting the minimum design and operational requirements. Recommendations included (1) requiring DC power divisional independence, (2) improved test, maintenance, and surveillance, and (3) requiring core cooling capability be maintained following the loss of one DC power bus and a single failure in another system

  3. Estimates of power requirements for a Manned Mars Rover powered by a nuclear reactor

    Science.gov (United States)

    Morley, Nicholas J.; El-Genk, Mohamed S.; Cataldo, Robert; Bloomfield, Harvey

    1991-01-01

    This paper assesses the power requirement for a Manned Mars Rover vehicle. Auxiliary power needs are fulfilled using a hybrid solar photovoltaic/regenerative fuel cell system, while the primary power needs are meet using an SP-100 type reactor. The primary electric power needs, which include 30-kW(e) net user power, depend on the reactor thermal power and the efficiency of the power conversion system. Results show that an SP-100 type reactor coupled to a Free Piston Stirling Engine yields the lowest total vehicle mass and lowest specific mass for the power system. The second lowest mass was for a SP-100 reactor coupled to a Closed Brayton Cycle using He/Xe as the working fluid. The specific mass of the nuclear reactor power system, including a man-rated radiation shield, ranged from 150-kg/kW(e) to 190-kg/KW(e) and the total mass of the Rover vehicle varied depend upon the cruising speed.

  4. Space nuclear power requirements for ozone layer modification

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1991-01-01

    This work estimates the power requirements for using photochemical processes driven by space nuclear power to counteract the Earth's ozone layer depletion. The total quantity of ozone (O 3 ) in the Earth's atmosphere is estimated to be about 4.7 x 10 37 molecules. The ozone production and destruction rates in the stratosphere are both on the order of 4.9 x 10 31 molecules/s, differing by a small fraction so that the net depletion rate is about 0.16 to 0.26% per year. The delivered optical power requirement for offsetting this depletion is estimated to be on the order of 3 GW. If the power were produced by satellite reactors at 800 km altitude (orbit decay time ∼ 300 years), some means of efficient power beaming would be needed to deliver the power to stratospheric levels (10--50 km). Ultraviolet radiation at 140--150 nm could have higher absorption rates in O 2 (leading to production of atomic oxygen, which can combine with O 2 to form O 3 ) than in ozone (leading to photodissociation of O 3 ). Potential radiation sources include H 2 lasers and direct nuclear pumping of ultraviolet fluorescers. 5 refs

  5. Mathematically modelling the power requirement for a vertical shaft mowing machine

    Directory of Open Access Journals (Sweden)

    Jorge Simón Pérez de Corcho Fuentes

    2008-09-01

    Full Text Available This work describes a mathematical model for determining the power demand for a vertical shaft mowing machine, particularly taking into account the influence of speed on cutting power, which is different from that of other models of mowers. The influence of the apparatus’ rotation and translation speeds was simulated in determining power demand. The results showed that no chan-ges in cutting power were produced by varying the knives’ angular speed (if translation speed was constant, while cutting power became increased if translation speed was increased. Variations in angular speed, however, influenced other parameters deter-mining total power demand. Determining this vertical shaft mower’s cutting pattern led to obtaining good crop stubble quality at the mower’s lower rotation speed, hence reducing total energy requirements.

  6. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  7. 12 CFR 932.2 - Total capital requirement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Total capital requirement. 932.2 Section 932.2 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.2 Total capital requirement. (a) Each Bank shall...

  8. Military power requirements and backup power considerations

    International Nuclear Information System (INIS)

    Botts, T.E.

    1986-01-01

    All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs

  9. Lift and Power Required for Flapping Wing Hovering Flight on Mars

    Science.gov (United States)

    Pohly, Jeremy; Sridhar, Madhu; Bluman, James; Kang, Chang-Kwon; Landrum, D. Brian; Fahimi, Farbod; Aono, Hikaru; Liu, Hao

    2017-11-01

    Achieving flight on Mars is challenging due to the ultra-low density atmosphere. Bio-inspired flapping motion can generate sufficient lift if bumblebee-inspired wings are scaled up between 2 and 4 times their nominal size. However, due to this scaling, the inertial power required to sustain hover increases and dominates over the aerodynamic power. Our results show that a torsional spring placed at the wing root can reduce the flapping power required for hover by efficiently storing and releasing energy while operating at its resonance frequency. The spring assisted reduction in flapping power is demonstrated with a well-validated, coupled Navier-Stokes and flight dynamics solver. The total power is reduced by 79%, whereas the flapping power is reduced by 98%. Such a reduction in power paves the way for an efficient, realizable micro air vehicle capable of vertical takeoff and landing as well as sustained flight on Mars. Alabama Space Grant Consortium Fellowship.

  10. Solid-state fast voltage compensator for pulsed power applications requiring constant AC power consumption

    CERN Document Server

    Magallanes, Francisco Cabaleiro; Viarouge, Philippe; Cros, Jérôme

    2015-01-01

    This paper proposes a novel topological solution for pulsed power converters based on capacitor-discharge topologies, integrating a Fast Voltage Compensator which allows an operation at constant power consumption from the utility grid. This solution has been retained as a possible candidate for the CLIC project under study at CERN, which requires more than a thousand synchronously-operated klystron modulators producing a total pulsed power of almost 40 GW. The proposed Fast Voltage Compensator is integrated in the modulator such that it only has to treat the capacitor charger current and a fraction of the charging voltage, meaning that its dimensioning power and cost are minimized. This topology can be used to improve the AC power quality of any pulsed converters based on capacitor-discharge concept. A prototype has been built and exploited to validate the operating principle and demonstrate the benefits of the proposed solution.

  11. Power requirements for commercial communications spacecraft

    Science.gov (United States)

    Billerbeck, W. J.

    1985-01-01

    Historical data on commercial spacecraft power systems are presented and their power requirements to the growth of satellite communications channel usage are related. Some approaches for estimating future power requirements of this class of spacecraft through the year 2000 are proposed. The key technology drivers in satellite power systems are addressed. Several technological trends in such systems are described, focusing on the most useful areas for research and development of major subsystems, including solar arrays, energy storage, and power electronics equipment.

  12. Reduction of wind power induced reserve requirements by advanced shortest-term forecasts and prediction intervals

    Energy Technology Data Exchange (ETDEWEB)

    Dobschinski, Jan; Wessel, Arne; Lange, Bernhard; Bremen, Lueder von [Fraunhofer Institut fuer Windenergie und Energiesystemtechnik (IWES), Kassel (Germany)

    2009-07-01

    In electricity systems with large penetration of wind power, the limited predictability of the wind power generation leads to an increase in reserve and balancing requirements. At first the present study concentrates on the capability of dynamic day-ahead prediction intervals to reduce the wind power induced reserve and balancing requirements. Alternatively the reduction of large forecast errors of the German wind power generation by using advanced shortest-term predictions has been evaluated in a second approach. With focus on the allocation of minute reserve power the aim is to estimate the maximal remaining uncertainty after trading activities on the intraday market. Finally both approaches were used in a case study concerning the reserve requirements induced by the total German wind power expansion in 2007. (orig.)

  13. Propulsion element requirements using electrical power system unscheduled power

    Science.gov (United States)

    Zimmermann, Frank; Hodge, Kathy

    1989-01-01

    The suitability of using the electrical energy from the Space Station's Electrical Power System (EPS) during the periods of peak solar insolation which is currently not specifically allocated (unscheduled power) to produce propulsion propellants, gaseous hydrogen, and oxygen by electrolyzing water is investigated. Reboost propellant requirements are emphasized, but the results are more generally relevant because the balance of recurring propellant requirements are an order of magnitude smaller and the nonrecurring requirements are not significant on an average basis.

  14. Manpower requirements of quality assurance personnel for the nuclear power plants

    International Nuclear Information System (INIS)

    Aly, A.E.; El-sayed, A.A.; Shabaan, I.H.

    1987-01-01

    Basic principles for structuring and staffing of the quality assurance (Q.A.)organisation in the nuclear power plant (NPP) are presented. the manpower requirements of the Q.A.organisation in the NPP during both construction and operational stages are determined. the manpower requirements for Q.A./Q.C. functions in a NPP are found to be proportional to the number of craft workers needed to perform the required level of the construction. The Q.A./Q.C. personnel are about 15% of the total number of the craft workers required during construction

  15. Requirements for the support power systems of CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1990-08-01

    This Standard covers principal criteria and requirements for design, fabrication, installation, qualification, inspection, and documentation for assurance that support power will be available as required. The minimum requirements for support power are determined by the special safety systems and other safety-related systems that must function to ensure that the public health risk is acceptably low. Support power systems of a CANDU nuclear power plant include those parts of the electrical systems and instrument air systems that are necessary for the operation of safety-related systems

  16. Standby battery requirements for telecommunications power

    Energy Technology Data Exchange (ETDEWEB)

    May, G.J. [The Focus Partnership, 126 Main Street, Swithland, Loughborough, Leics LE12 8TJ (United Kingdom)

    2006-08-25

    The requirements for standby power for telecommunications are changing as the network moves from conventional systems to Internet Protocol (IP) telephony. These new systems require higher power levels closer to the user but the level of availability and reliability cannot be compromised if the network is to provide service in the event of a failure of the public utility. Many parts of these new networks are ac rather than dc powered with UPS systems for back-up power. These generally have lower levels of reliability than dc systems and the network needs to be designed such that overall reliability is not reduced through appropriate levels of redundancy. Mobile networks have different power requirements. Where there is a high density of nodes, continuity of service can be reasonably assured with short autonomy times. Furthermore, there is generally no requirement that these networks are the provider of last resort and therefore, specifications for continuity of power are directed towards revenue protection and overall reliability targets. As a result of these changes, battery requirements for reserve power are evolving. Shorter autonomy times are specified for parts of the network although a large part will continue to need support for hours rather minutes. Operational temperatures are increasing and battery solutions that provide longer life in extreme conditions are becoming important. Different battery technologies will be discussed in the context of these requirements. Conventional large flooded lead/acid cells both with pasted and tubular plates are used in larger central office applications but the majority of requirements are met with valve-regulated lead/acid (VRLA) batteries. The different types of VRLA battery will be described and their suitability for various applications outlined. New developments in battery construction and battery materials have improved both performance and reliability in recent years. Alternative technologies are also being proposed

  17. Nuclear plant requirements during power system restoration

    International Nuclear Information System (INIS)

    Adamski, G.; Jenkins, R.; Gill, P.

    1995-01-01

    This paper is one of a series presented on behalf of the System Operation Subcommittee with the intent of focusing industry attention on power system restoration issues. This paper discusses a number of nuclear power plant requirements that require special attention during power system restoration

  18. Ideal MHD Stability Prediction and Required Power for EAST Advanced Scenario

    International Nuclear Information System (INIS)

    Chen Junjie; Li Guoqiang; Qian Jinping; Liu Zixi

    2012-01-01

    The Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak with a D-shaped cross-sectional plasma presently in operation. The ideal magnetohydrodynamic (MHD) stability and required power for the EAST advanced tokamak (AT) scenario with negative central shear and double transport barrier (DTB) are investigated. With the equilibrium code TOQ and stability code GATO, the ideal MHD stability is analyzed. It is shown that a moderate ratio of edge transport barriers' (ETB) height to internal transport barriers' (ITBs) height is beneficial to ideal MHD stability. The normalized beta β N limit is about 2.20 (without wall) and 3.70 (with ideal wall). With the scaling law of energy confinement time, the required heating power for EAST AT scenario is calculated. The total heating power P t increases as the toroidal magnetic field B T or the normalized beta β N is increased. (magnetically confined plasma)

  19. Ideal MHD Stability Prediction and Required Power for EAST Advanced Scenario

    Science.gov (United States)

    Chen, Junjie; Li, Guoqiang; Qian, Jinping; Liu, Zixi

    2012-11-01

    The Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak with a D-shaped cross-sectional plasma presently in operation. The ideal magnetohydrodynamic (MHD) stability and required power for the EAST advanced tokamak (AT) scenario with negative central shear and double transport barrier (DTB) are investigated. With the equilibrium code TOQ and stability code GATO, the ideal MHD stability is analyzed. It is shown that a moderate ratio of edge transport barriers' (ETB) height to internal transport barriers' (ITBs) height is beneficial to ideal MHD stability. The normalized beta βN limit is about 2.20 (without wall) and 3.70 (with ideal wall). With the scaling law of energy confinement time, the required heating power for EAST AT scenario is calculated. The total heating power Pt increases as the toroidal magnetic field BT or the normalized beta βN is increased.

  20. Effect of power system technology and mission requirements on high altitude long endurance aircraft

    Science.gov (United States)

    Colozza, Anthony J.

    1994-01-01

    An analysis was performed to determine how various power system components and mission requirements affect the sizing of a solar powered long endurance aircraft. The aircraft power system consists of photovoltaic cells and a regenerative fuel cell. Various characteristics of these components, such as PV cell type, PV cell mass, PV cell efficiency, fuel cell efficiency, and fuel cell specific mass, were varied to determine what effect they had on the aircraft sizing for a given mission. Mission parameters, such as time of year, flight altitude, flight latitude, and payload mass and power, were also altered to determine how mission constraints affect the aircraft sizing. An aircraft analysis method which determines the aircraft configuration, aspect ratio, wing area, and total mass, for maximum endurance or minimum required power based on the stated power system and mission parameters is presented. The results indicate that, for the power system, the greatest benefit can be gained by increasing the fuel cell specific energy. Mission requirements also substantially affect the aircraft size. By limiting the time of year the aircraft is required to fly at high northern or southern latitudes, a significant reduction in aircraft size or increase in payload capacity can be achieved.

  1. Technological implications of fusion power: requirements and status

    International Nuclear Information System (INIS)

    Steiner, D.

    1978-01-01

    The major technological requirements for fusion power, as implied by current conceptual designs of fusion power plants, are identified and assessed relative to the goals of existing technology programs. The focus of the discussion is on the tokamak magnetic confinement concept; however, key technological requirements of mirror magnetic confinement systems and of inertial confinement concepts will also be addressed. The required technology is examined on the basis of three general areas of concern: (a) the power balance, that is, the unique power handling requirements associated with the production of electrical power by fusion; (b) reactor design, focusing primarily on the requirements imposed by a tritium-based fuel cycle, thermal hydraulic considerations, and magnet systems; and (c) materials considerations, including radiation damage effects, neutron-induced activation, and resource limitations

  2. Total Magnetic Field Signatures over Submarine HVDC Power Cables

    Science.gov (United States)

    Johnson, R. M.; Tchernychev, M.; Johnston, J. M.; Tryggestad, J.

    2013-12-01

    Mikhail Tchernychev, Geometrics, Inc. Ross Johnson, Geometrics, Inc. Jeff Johnston, Geometrics, Inc. High Voltage Direct Current (HVDC) technology is widely used to transmit electrical power over considerable distances using submarine cables. The most commonly known examples are the HVDC cable between Italy and Greece (160 km), Victoria-Tasmania (300 km), New Jersey - Long Island (82 km) and the Transbay cable (Pittsburg, California - San-Francisco). These cables are inspected periodically and their location and burial depth verified. This inspection applies to live and idle cables; in particular a survey company could be required to locate pieces of a dead cable for subsequent removal from the sea floor. Most HVDC cables produce a constant magnetic field; therefore one of the possible survey tools would be Marine Total Field Magnetometer. We present mathematical expressions of the expected magnetic fields and compare them with fields observed during actual surveys. We also compare these anomalies fields with magnetic fields produced by other long objects, such as submarine pipelines The data processing techniques are discussed. There include the use of Analytic Signal and direct modeling of Total Magnetic Field. The Analytic Signal analysis can be adapted using ground truth where available, but the total field allows better discrimination of the cable parameters, in particular to distinguish between live and idle cable. Use of a Transverse Gradiometer (TVG) allows for easy discrimination between cable and pipe line objects. Considerable magnetic gradient is present in the case of a pipeline whereas there is less gradient for the DC power cable. Thus the TVG is used to validate assumptions made during the data interpretation process. Data obtained during the TVG surveys suggest that the magnetic field of a live HVDC cable is described by an expression for two infinite long wires carrying current in opposite directions.

  3. Predicting thyroxine requirements following total thyroidectomy.

    Science.gov (United States)

    Mistry, Dipan; Atkin, Stephen; Atkinson, Helen; Gunasekaran, Sinnappa; Sylvester, Deborah; Rigby, Alan S; England, R James

    2011-03-01

    Optimal thyroxine replacement following total thyroidectomy is critical to avoid symptoms of hypothyroidism. The aim of this study was to determine the best formula to determine the initiated replacement dose of levothyroxine immediately following total thyroidectomy. Prospective study. All patients were initiated on 100 μg levothyroxine and titrated to within the reference range for TSH and free T4. Correlations to height, weight, age, lean body mass (LBM), body surface area (BSA) and body mass index (BMI) were calculated. One hundred consecutive adult patients underwent total thyroidectomy for non-malignant disease. Comparison between three methods of levothyroxine dose prediction, aiming for a levothyroxine dose correct to within 25 μg of actual dose required. Correlations were seen between levothyroxine dose and patient age (r=-0.346, Pregression equation was calculated (predicted levothyroxine dose=[0·943 × bodyweight] + [-1.165 × age] + 125.8), simplified to (levothyroxine dose= bodyweight - age + 125) pragmatically. Initiating patients empirically on 100 μg post-operatively showed that 40% of patients achieved target within 25 μg of their required dose; this increased to 59% when using a weight-only dose calculation (1.6 μg/kg) and to 72% using the simplified regression equation. A simple calculated regression equation gives a more accurate prediction of initiated levothyroxine dose following total thyroidectomy, reducing the need for outpatient attendance for dose titration. © 2011 Blackwell Publishing Ltd.

  4. Nuclear power strategy: requirements for technology

    International Nuclear Information System (INIS)

    Orlov, V.V.; Rachkov, V.I.

    2001-01-01

    The possible role of nuclear power in sustainable development demands answers to at least three questions: Is large-scale nuclear power essential to future development? - Is it feasible to have modern nuclear power transformed for large-scale deployment? - When will large-scale nuclear power be practically needed? The questions are analysed with the requirements to be fulfilled concerning present-day technologies

  5. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  6. TOKMINA, Toroidal Magnetic Field Minimization for Tokamak Fusion Reactor. TOKMINA-2, Total Power for Tokamak Fusion Reactor

    International Nuclear Information System (INIS)

    Hatch, A.J.

    1975-01-01

    1 - Description of problem or function: TOKMINA finds the minimum magnetic field, Bm, required at the toroidal coil of a Tokamak type fusion reactor when the input is beta(ratio of plasma pressure to magnetic pressure), q(Kruskal-Shafranov plasma stability factor), and y(ratio of plasma radius to vacuum wall radius: rp/rw) and arrays of PT (total thermal power from both d-t and tritium breeding reactions), Pw (wall loading or power flux) and TB (thickness of blanket), following the method of Golovin, et al. TOKMINA2 finds the total power, PT, of such a fusion reactor, given a specified magnetic field, Bm, at the toroidal coil. 2 - Method of solution: TOKMINA: the aspect ratio(a) is minimized, giving a minimum value for Bm. TOKMINA2: a search is made for PT; the value of PT which minimizes Bm to the required value within 50 Gauss is chosen. 3 - Restrictions on the complexity of the problem: Input arrays presently are dimensioned at 20. This restriction can be overcome by changing a dimension card

  7. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man-month study, jointly funded by EPRI and McDonnell Douglas Astronautics Company-EAST, was undertaken to identify the utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980's. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980's. The issues are not meant to reflect a negative view of fusion, but are items which must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980's were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  8. Nuclear Space Power Systems Materials Requirements

    International Nuclear Information System (INIS)

    Buckman, R.W. Jr.

    2004-01-01

    High specific energy is required for space nuclear power systems. This generally means high operating temperatures and the only alloy class of materials available for construction of such systems are the refractory metals niobium, tantalum, molybdenum and tungsten. The refractory metals in the past have been the construction materials selected for nuclear space power systems. The objective of this paper will be to review the past history and requirements for space nuclear power systems from the early 1960's through the SP-100 program. Also presented will be the past and present status of refractory metal alloy technology and what will be needed to support the next advanced nuclear space power system. The next generation of advanced nuclear space power systems can benefit from the review of this past experience. Because of a decline in the refractory metal industry in the United States, ready availability of specific refractory metal alloys is limited

  9. Load following operation of nuclear power plants for meeting power system requirements

    International Nuclear Information System (INIS)

    Isoda, Hachiro

    1987-01-01

    This paper describes a calculating program on the availability factors of nuclear, thermal and pumed storage hydro power stations and some calculated results for typical three load factors, 55 %, 60 % and 71 %, are provided when the share of the nuclea power station in the generation facilities is increased. The load following requirement of the nuclear power station is also provided. Load following requirement: If there is a 10 % pumped storage hydro power station, the nuclear power station enables to be operated with its rated output up to 30 % - 35 % of its share. Its daily load following operation for 40 % and 50 % nuclear power station needs every weekend and every day respectively. Availability factor: The availability factor of the nuclear power station manages to get 80 % (maximum availability factor of the nuclear power station in this study) up to 30 % share of it with 10 % pumpued storage hydro power station. When the nuclear power station shares 40 % and 50 %, its availability factor decreases down 1 % and 5 % respectively. (author)

  10. Review of the total system related to operation of nuclear-powered ship

    International Nuclear Information System (INIS)

    Takamasa, Tomoji; Miyashita, Kunio

    2000-01-01

    It is essential to establish a marine reactor having excellent safety and reliability, which is capable of competing economically with conventional ships, and which can be accepted by international society, in order to be prepared for practical application of future nuclear-powered ships. For this purpose, it is important not only to demonstrate a marine reactor using a model or test device to simulate actual operation, but also to establish the environmental requirements for operation of a nuclear-powered ship, such as safety standards that are operationally and internationally common for ships, and to establish a repair base for nuclear-powered ships. Systems research for the practical application of nuclear-powered ships was conducted for five years, fiscal years 1992 through 1996, by a group in the Japan Atomic Energy Research Institute (JAERI), under the project title 'Review of the total system related to operation of nuclear-powered ships.' The project sought to summarize requirements for the practical application of nuclear-powered ships from the standpoint of the need side, e.g., what nuclear-powered ships will be requested, and what functions will be provided under the expected future social environment; to show a complete system concept for the operation of nuclear-powered ships; and to clarify the situations creating demand for nuclear-powered ships, as well as the system and environmental conditions to be established for operation of practical nuclear-powered ships. Study considerations included the size of the operation system for a nuclear-powered ship, a scenario for introducing a nuclear-powered container ship, and economic evolution from the effects on the whole shipping system, based on container ships, of introducing a nuclear-powered ship. The results of these considerations were made the framework for constructing an entire system and evaluating its economy. The treatment and disposal of radioactive waste from a nuclear-powered ship, and the

  11. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  12. Nuclear power manpower and training requirements

    International Nuclear Information System (INIS)

    Whan, G.A.

    1984-01-01

    A broad spectrum of technical personnel is required to conduct a national nuclear power program, predominantly electrical, mechanical, and nuclear engineers and health physicists. The need for nuclear education and training, even in the early planning states, is the topic of this paper. Experience gained in the United States can provide useful information to Asia-Pacific countries developing nuclear power programs. Including both on-site and off-site personnel, U.S. plants average about 570 workers for BWRs and 700 for PWRs. The need for an additional 57,000 technical employees over the next decade is projected. The technical backgrounds of the manpower required to operate and support a nuclear power plant are distinctly different from those used by non-nuclear utilities. Manpower cannot be transferred from fossil fuel plants without extensive training. Meeting the demand for nuclear education and training must be a friendly partnership among universities, government, and industry. The long-term supply of nuclear-educated personnel requires strong, government-supported universities. Most specific training, however, must be provided by industry. (author)

  13. Electrofishing power requirements in relation to duty cycle

    Science.gov (United States)

    Miranda, L.E.; Dolan, C.R.

    2004-01-01

    Under controlled laboratory conditions we measured the electrical peak power required to immobilize (i.e., narcotize or tetanize) fish of various species and sizes with duty cycles (i.e., percentage of time a field is energized) ranging from 1.5% to 100%. Electrofishing effectiveness was closely associated with duty cycle. Duty cycles of 10-50% required the least peak power to immobilize fish; peak power requirements increased gradually above 50% duty cycle and sharply below 10%. Small duty cycles can increase field strength by making possible higher instantaneous peak voltages that allow the threshold power needed to immobilize fish to radiate farther away from the electrodes. Therefore, operating within the 10-50% range of duty cycles would allow a larger radius of immobilization action than operating with higher duty cycles. This 10-50% range of duty cycles also coincided with some of the highest margins of difference between the electrical power required to narcotize and that required to tetanize fish. This observation is worthy of note because proper use of duty cycle could help reduce the mortality associated with tetany documented by some authors. Although electrofishing with intermediate duty cycles can potentially increase effectiveness of electrofishing, our results suggest that immobilization response is not fully accounted for by duty cycle because of a potential interaction between pulse frequency and duration that requires further investigation.

  14. Optimal Power Allocation for Downstream xDSL With Per-Modem Total Power Constraints: Broadcast Channel Optimal Spectrum Balancing (BC-OSB)

    Science.gov (United States)

    Le Nir, Vincent; Moonen, Marc; Verlinden, Jan; Guenach, Mamoun

    2009-02-01

    Recently, the duality between Multiple Input Multiple Output (MIMO) Multiple Access Channels (MAC) and MIMO Broadcast Channels (BC) has been established under a total power constraint. The same set of rates for MAC can be achieved in BC exploiting the MAC-BC duality formulas while preserving the total power constraint. In this paper, we describe the BC optimal power allo- cation applying this duality in a downstream x-Digital Subscriber Lines (xDSL) context under a total power constraint for all modems over all tones. Then, a new algorithm called BC-Optimal Spectrum Balancing (BC-OSB) is devised for a more realistic power allocation under per-modem total power constraints. The capacity region of the primal BC problem under per-modem total power constraints is found by the dual optimization problem for the BC under per-modem total power constraints which can be rewritten as a dual optimization problem in the MAC by means of a precoder matrix based on the Lagrange multipliers. We show that the duality gap between the two problems is zero. The multi-user power allocation problem has been solved for interference channels and MAC using the OSB algorithm. In this paper we solve the problem of multi-user power allocation for the BC case using the OSB algorithm as well and we derive a computational efficient algorithm that will be referred to as BC-OSB. Simulation results are provided for two VDSL2 scenarios: the first one with Differential-Mode (DM) transmission only and the second one with both DM and Phantom- Mode (PM) transmissions.

  15. Safety requirements for a nuclear power plant electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Fouad, L F; Shinaishin, M A

    1988-06-15

    This work aims at identifying the safety requirements for the electric power system in a typical nuclear power plant, in view of the UNSRC and the IAEA. Description of a typical system is provided, followed by a presentation of the scope of the information required for safety evaluation of the system design and performance. The acceptance and design criteria that must be met as being specified by both regulatory systems, are compared. Means of implementation of such criteria as being described in the USNRC regulatory guides and branch technical positions on one hand and in the IAEA safety guides on the other hand are investigated. It is concluded that the IAEA regulations address the problems that may be faced with in countries having varying grid sizes ranging from large stable to small potentially unstable ones; and that they put emphasis on the onsite standby power supply. Also, in this respect the Americans identify the grid as the preferred power supply to the plant auxiliaries, while the IAEA leaves the possibility that the preferred power supply could be either the grid or the unit main generator depending on the reliability of each. Therefore, it is found that it is particularly necessary in this area of electric power supplies to deal with the IAEA and the American sets of regulations as if each complements and not supplements the other. (author)

  16. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-02-01

    The power supply requirements for a 7-M major radius commercial tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and MHD calculations, and power supply characteristics and cost data. A conventional system using an MGF set and solid-state rectifier/inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (approx. > 8 s) seems to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  17. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  18. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  19. Design of a Solid-State Fast Voltage Compensator for klystron modulators requiring constant AC power consumption

    CERN Document Server

    Aguglia, Davide; Viarouge, Philippe; Cros, Jerome

    2014-01-01

    This paper proposes a novel topological solution for klystron modulators integrating a Fast Voltage Compensator which allows an operation at constant power consumption from the utility grid. This kind of solution is mandatory for the CLIC project under study, which requires several hundreds of synchronously operated klystron modulators for a total pulsed power of 39 GW. The topology is optimized for the challenging CLIC specifications, which require a very precise output voltage flat-top as well as fast rise and fall times (3µs). The Fast Voltage Compensator is integrated in the modulator such that it only has to manage the capacitor charger current and a fraction of the charging voltage. Consequently, its dimensioning power and cost is minimized.

  20. 46 CFR 111.10-4 - Power requirements, generating sources.

    Science.gov (United States)

    2010-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must... or sources must be sufficient to supply those services necessary to provide normal operational...

  1. Controlling total spot power from holographic laser by superimposing a binary phase grating.

    Science.gov (United States)

    Liu, Xiang; Zhang, Jian; Gan, Yu; Wu, Liying

    2011-04-25

    By superimposing a tunable binary phase grating with a conventional computer-generated hologram, the total power of multiple holographic 3D spots can be easily controlled by changing the phase depth of grating with high accuracy to a random power value for real-time optical manipulation without extra power loss. Simulation and experiment results indicate that a resolution of 0.002 can be achieved at a lower time cost for normalized total spot power.

  2. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-01-01

    The power supply requirements for a 7-m major radius commerical tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and magnetohydrodynamics calculations, and power supply characteristics and cost data. A conventional system using a motor-generator flywheel set and solid-state rectifier-inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (greater than or equal to 8 s) seem to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  3. Safety of Nuclear Power Plants: Design. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  4. Analysis of Power Network for Line Reactance Variation to Improve Total Transmission Capacity

    Directory of Open Access Journals (Sweden)

    Ikram Ullah

    2016-11-01

    Full Text Available The increasing growth in power demand and the penetration of renewable distributed generations in competitive electricity market demands large and flexible capacity from the transmission grid to reduce transmission bottlenecks. The bottlenecks cause transmission congestion, reliability problems, restrict competition, and limit the maximum dispatch of low cost generations in the network. The electricity system requires efficient utilization of the current transmission capability to improve the Available Transfer Capability (ATC. To improve the ATC, power flow among the lines can be managed by using Flexible AC Transmission System (FACTS devices as power flow controllers, which alter the parameters of power lines. It is important to place FACTS devices on suitable lines to vary the reactance for improving Total Transmission Capacity (TTC of the network and provide flexibility in the power flow. In this paper a transmission network is analyzed based on line parameters variation to improve TTC of the interconnected system. Lines are selected for placing FACTS devices based on real power flow Performance Index (PI sensitivity factors. TTC is computed using the Repeated Power Flow (RPF method using the constraints of lines thermal limits, bus voltage limits and generator limits. The reactance of suitable lines, selected on the basis of PI sensitivity factors are changed to divert the power flow to other lines with enough transfer capacity available. The improvement of TTC using line reactance variation is demonstrated with three IEEE test systems with multi-area networks. The results show the variation of the selected lines’ reactance in improving TTC for all the test networks with defined contingency cases.

  5. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  6. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  7. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  8. 18 CFR 35.37 - Market power analysis required.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Market power analysis required. 35.37 Section 35.37 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Wholesale Sales of Electric Energy, Capacity and Ancillary Services at Market-Based Rates § 35.37 Market...

  9. Grid Code Requirements for Wind Power Integration

    DEFF Research Database (Denmark)

    Wu, Qiuwei

    2018-01-01

    This chapter reviews the grid code requirements for integration of wind power plants (WPPs). The grid codes reviewed are from the UK, Ireland, Germany, Denmark, Spain, Sweden, the USA, and Canada. Transmission system operators (TSOs) around the world have specified requirements for WPPs under...

  10. Facing the facts: the suspension of a design requirement applicable to nuclear power reactor effluents

    International Nuclear Information System (INIS)

    Amado, Valeria; Biaggio, Alfredo; Canoba, Analia; Curti, Adriana

    2008-01-01

    A design requirement aimed at limiting the discharge of globally dispersed long-lived radionuclides released by nuclear power reactors was in force in Argentine since 1979 till recently. The practical results of such regulatory measure was the need to retain C-14 in the PHWR under construction, as well as in furniture heavy water reactors to be built in the country. This paper explains the basis of such requirement, which was formulated as a collective dose constraint per unit of energy generated, and the main assumptions that triggered it. The differences between the assumptions made at the time and the reality of nuclear power generation at the beginning of the 21 st century, as well as their implications in relation to the requirement are described, including the Suess effect and its impact in the total dose due to C-14. Finally, the facts that made no longer reasonable to keep in force the above mentioned requirement are presented. (author)

  11. When the test of mediation is more powerful than the test of the total effect.

    Science.gov (United States)

    O'Rourke, Holly P; MacKinnon, David P

    2015-06-01

    Although previous research has studied power in mediation models, the extent to which the inclusion of a mediator will increase power has not been investigated. To address this deficit, in a first study we compared the analytical power values of the mediated effect and the total effect in a single-mediator model, to identify the situations in which the inclusion of one mediator increased statistical power. The results from this first study indicated that including a mediator increased statistical power in small samples with large coefficients and in large samples with small coefficients, and when coefficients were nonzero and equal across models. Next, we identified conditions under which power was greater for the test of the total mediated effect than for the test of the total effect in the parallel two-mediator model. These results indicated that including two mediators increased power in small samples with large coefficients and in large samples with small coefficients, the same pattern of results that had been found in the first study. Finally, we assessed the analytical power for a sequential (three-path) two-mediator model and compared the power to detect the three-path mediated effect to the power to detect both the test of the total effect and the test of the mediated effect for the single-mediator model. The results indicated that the three-path mediated effect had more power than the mediated effect from the single-mediator model and the test of the total effect. Practical implications of these results for researchers are then discussed.

  12. FLECH PowerMax Service Requirement Specification

    DEFF Research Database (Denmark)

    It is expected that in the future, ancillary services will be required at distribution level. This work describes how one of these ancillary services, the PowerMax service, must be spec ified within a market framework. The basis of this work is the Flexibility Clearing House (FLE CH) platform...... and the Distribution System Operator (DSO) services defined in [1]. The PowerMax service has been further discussed in [2], and this technical report seeks to clarify the implementation details first discussed in that paper. The aim of the PowerMax service it to relieve congestion issue s in the distribution system...... by establishing a maximum power that a cluster of consumer devices may draw from the syste m. The consumers will receive a payment for providing this service, and the DSO will be able to postpone grid reinfo rcement...

  13. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  14. Implications of fusion power plant studies for materials requirements

    International Nuclear Information System (INIS)

    Cook, Ian; Ward, David; Dudarev, Sergei

    2002-01-01

    This paper addresses the key requirements for fusion materials, as these have emerged from studies of commercial fusion power plants. The objective of the international fusion programme is the creation of power stations that will have very attractive safety and environmental features and viable economics. Fusion power plant studies have shown that these objectives may be achieved without requiring extreme advances in materials. But it is required that existing candidate materials perform at least as well as envisaged in the environment of fusion neutrons, heat fluxes and particle fluxes. The development of advanced materials would bring further benefits. The work required entails the investigation of many intellectually exciting physics issues of great scientific interest, and of wider application than fusion. In addition to giving an overview, selected aspects of the science, of particular physics interest, are illustrated

  15. Manpower requirements for nuclear power in developing countries

    International Nuclear Information System (INIS)

    Csik, B.J.

    1980-01-01

    It is recognized that each country has its individual unique characteristics and that there is no typical or average developing country. Common conditions represent exceptions, rather than the rule. Manpower requirements, however, are created by the tasks to be performed and activities to be carried out at each definite stage of a nuclear power project or programme. These tasks and activities, as well as the manpower requirements they create, are of a similar nature for any country, subject to the influence of prevailing local conditions. First, successive stages of the evolution of a nuclear power programme are defined. These are: pre-planning, planning, study and procurement, construction, operation of the first plant, confirmed and self-sufficient in implementing nuclear power projects. The developing countries are then classified according to the present stage of their evolution. Finally, the present and future manpower requirements of each country or group of countries are estimated. No attempt has been made to try to establish any precise data for any country in particular. The results obtained are global estimates, intended as indications of trends and of orders of magnitude. It is found that the developing world's present manpower requirements for nuclear power are of the order of 100,000 people, of which about 20,000 need specialized nuclear training. By the year 2000, for an installed nuclear capacity of 150 to 200 GW, overall manpower requirements should increase to more than 500,000 which would include 130,000 with specialized nuclear training. (author)

  16. Monopolist requires totally liberalization

    International Nuclear Information System (INIS)

    Janoska, J.

    2003-01-01

    Slovenske elektrarne (SE), a.s, Bratislava in present time operates some sources, which would be off at normal conditions. It was caused by high electricity price on European markets. It is possible to sell 1 MWh for 12 thousands Slovak crowns abroad in last months. It is also advantageous to initialise thermal sources for power plant, where variable expenses are higher - from 1200 to 1300 Slovak crowns per MWh. SE are mainly trying to sell most of electricity on domestic market because returnability of dominant nuclear power plants was projected for this market. Utilizing capacities profit via domestic market covers fixed costs of power plants. Besides, power plant can demand regulated price 1272 Slovak crowns per 1 MWh. SE sources have capacity of 6800 MW, but maximal daily load uses for example in December approximately 4000 MW. Overflows are more higher in the summer - load dropped to 2200 MW in the beginning of September in last year. It is noted in issue that price increase in Europe is noticed. Price of primary power electricity will remain at liquid markets at 28 Euro (1176 Slovak crowns) in the following year prices fluctuate from 38 to 40 Euro (to 1700 Slovak crowns) per 1 MW at load peaks. Price increase is caused by lack of sources - it does not keep up to satisfy demand increase. Sources are gradually laid up and no new sources are built. Production capacities will decrease also in SE - by laying up of two 440 MW blocks of Bohunice NPP V-1. Price increase trend will continue according to SE businessmen till it is advantageous to build new source. Present price trend can be accelerated by decision about completing of Mochovce NPP 3-4

  17. Nuclear space power and propulsion requirements and issues

    International Nuclear Information System (INIS)

    Swerdling, M.; Isenberg, L.

    1995-01-01

    The use of nuclear power in space is going through a low point. The kinds of missions that would use nuclear power are expensive and there are few new expensive missions. Both NASA and DoD are in a mode of cheaper, faster, better, which means using what is available as much as possible and only incorporating new technology to reduce mission cost. NASA is performing Mission to Planet Earth and detailed exploration missions of Mars. These NASA missions can be done with solar-battery power subsystems and there is no need for nuclear power. The NASA mission to Pluto does require nuclear radioisotope power. Ways to reduce the power subsystem cost and the power level are being investigated. NASA is studying ways to explore beyond Mars with solar-battery power because of the cost and uncertainty in the availability and launchability of nuclear space power systems. The DoD missions are all in earth orbit and can be done with solar-battery systems. The major DoD requirement at present is to reduce costs of all their space missions. One way to do this is to develop highly efficient upper stage boosters that can be integrated with lower cost Earth to low orbit stages and still place their payloads in to higher orbits. One attractive upper stage is a nuclear bimodal (propulsion and power) engine to accomplished lower booster cost to place space assets in GEO. However this is not being pursued because of DOE's new policy not to fund nuclear space power research and development as well as the difficulty in obtaining launch approval for nuclear propulsion and power systems

  18. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  19. Reduced power processor requirements for the 30-cm diameter HG ion thruster

    Science.gov (United States)

    Rawlin, V. K.

    1979-01-01

    The characteristics of power processors strongly impact the overall performance and cost of electric propulsion systems. A program was initiated to evaluate simplifications of the thruster-power processor interface requirements. The power processor requirements are mission dependent with major differences arising for those missions which require a nearly constant thruster operating point (typical of geocentric and some inbound planetary missions) and those requiring operation over a large range of input power (such as outbound planetary missions). This paper describes the results of tests which have indicated that as many as seven of the twelve power supplies may be eliminated from the present Functional Model Power Processor used with 30-cm diameter Hg ion thrusters.

  20. Training Requirements and Training Delivery in the Total Army School System

    National Research Council Canada - National Science Library

    Winkler, John

    1999-01-01

    This report analyzes training requirements and school delivery of training in the Total Army School System, focusing on the system's ability to meet its training requirements in Reserve Component Training Institutions...

  1. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  2. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  3. Nuclear power technology requirements for NASA exploration missions

    International Nuclear Information System (INIS)

    Bloomfield, H.S.

    1990-01-01

    This paper discusses how future exploration of the Moon and Mars will mandate developments in many areas of technology. In particular, major advances will be required in planet surface power systems and space transportation systems. Critical nuclear technology challenges that can enable strategic self-sufficiency, acceptable operational costs and cost-effective space transportation goals for NASA exploration missions have been identified. Critical technologies for surface power systems include stationary and mobile nuclear reactor and radio-isotope heat sources coupled to static and dynamic power conversion devices. These technologies can provide dramatic reductions in mass leading to operational and transportation cost savings. Critical technologies for space transportation systems include nuclear thermal rocket and nuclear electric propulsion options which present compelling concepts for significantly reducing mass, cost or travel time required for Earth-Mars transport

  4. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  5. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  6. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  7. Resistive vs. total power depositions by Alfven modes in pre-heated low aspect ratio tokamaks

    International Nuclear Information System (INIS)

    Cuperman, S.; Bruma, C.; Komoshvili, K.

    2004-01-01

    The power deposition of fast waves launched by a LFS located antenna in a pre-heated, strongly non-uniform low aspect ratio tokamak (START) is investigated. The rigorous computational results indicate a total power deposition by far larger than that predicted for Alfven continuum eigenmodes in cylindrical plasmas. For toroidal wave numbers |N| > 1, the resistive and total power depositions are almost equal. (author)

  8. Grid code requirements for wind power generation

    International Nuclear Information System (INIS)

    Djagarov, N.; Filchev, S.; Grozdev, Z.; Bonev, M.

    2011-01-01

    In this paper production data of wind power in Europe and Bulgaria and plans for their development within 2030 are reviewed. The main characteristics of wind generators used in Bulgaria are listed. A review of the grid code in different European countries, which regulate the requirements for renewable sources, is made. European recommendations for requirements harmonization are analyzed. Suggestions for the Bulgarian gird code are made

  9. Neutral beam energy and power requirements for expanding radius and full bore startup of tokamak reactors

    International Nuclear Information System (INIS)

    Houlberg, W.A.; Mense, A.T.; Attenberger, S.E.

    1979-09-01

    Natural beam power and energy requirements are compared for full density full bore and expanding radius startup scenarios in an elongated plasma, The Next Step (TNS), as a function of beam pulse time and plasma density. Because of the similarity of parameters, the results should also be applicable to Engineering Test Facility (ETF) and International Tokamak Reactor (INTOR) studies. A transport model consisting of neoclassical ion conduction and anomalous electron conduction and diffusion based on ALCATOR scaling leads to average densities in the range approx. 0.8 to 1.2 x 10 14 cm -3 being sufficient for ignition. Neutral deuterium beam energies in the range 120 to 180 keV are adequate for penetration, with the required power injected into the plasma decreasing with increasing beam energy. The neutral beam power decreases strongly with increasing beam pulse length b/sub b/ until t/sub b/ exceeds a few total energy confinement times, yielding b/sub b/ approx. = 4 to 6 s for the TNS plasma

  10. Safety and regulatory requirements of nuclear power plants

    International Nuclear Information System (INIS)

    Kumar, S.V.; Bhardwaj, S.A.

    2000-01-01

    A pre-requisite for a nuclear power program in any country is well established national safety and regulatory requirements. These have evolved for nuclear power plants in India with participation of the regulatory body, utility, research and development (R and D) organizations and educational institutions. Prevailing international practices provided a useful base to develop those applicable to specific system designs for nuclear power plants in India. Their effectiveness has been demonstrated in planned activities of building up the nuclear power program as well as with unplanned activities, like those due to safety related incidents etc. (author)

  11. 18 CFR 284.504 - Standard requirements for market-power authorizations.

    Science.gov (United States)

    2010-04-01

    ... Commission within 10 days of acquiring knowledge of significant changes occurring in its market power status... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Standard requirements for market-power authorizations. 284.504 Section 284.504 Conservation of Power and Water Resources...

  12. Power system requirements and selection for the space exploration initiative

    International Nuclear Information System (INIS)

    Biringer, K.L.; Bartine, D.E.; Buden, D.; Foreman, J.; Harrison, S.

    1991-01-01

    The Space Exploration Initiative (SEI) seeks to reestablish a US program of manned and unmanned space exploration. The President has called for a program which includes a space station element, a manned habitation of the moon, and a human exploration of Mars. The NASA Synthesis Group has developed four significantly different architectures for the SEI program. One key element of a space exploration effort is the power required to support the missions. The Power Speciality Team of the Synthesis Group was tasked with assessing and evaluating the power requirements and candidate power technologies for such missions. Inputs to the effort came from existing NASA studies as well as other governments agency inputs such as those from DOD and DOE. In addition, there were industry and university briefings and results of solicitations from the AIAA and the general public as part of the NASA outreach effort. Because of the variety of power needs in the SEI program, there will be a need for multiple power system technologies including solar, nuclear and electrochemical. Due to the high rocket masses required to propel payloads to the moon and beyond to Mars, there is great emphasis placed on the need for high power density and high energy density systems. Power system technology development work is needed results will determine the ultimate technology selections. 23 refs., 10 figs

  13. VGB-requirements regarding technical data for power plants

    International Nuclear Information System (INIS)

    Richnow, Joerg

    2009-01-01

    Much of the technical plant data resulting from the planning, construction and start-up of power plants is needed for subsequent management and maintenance. Because of this, VGB has taken the initiative and has defined standard minimum requirements from power plant operators for technical plant data. They relate to the details and structure of this data, the definition of material classes and characteristics for the main power plant components and IT implementation for delivery of the technical plant data. (orig.)

  14. Requirements Specication for Ampliers and Power Supplies in Active Loudspeakers

    DEFF Research Database (Denmark)

    Schneider, Henrik; Jensen, Lasse Crone; Petersen, Lars Press

    2014-01-01

    This work aims to provide designers with a method to develop a requirements specication for power supplies and ampliers in active loudspeakers. The motivation is to avoid over-sizing and unnecessary cost. A realistic estimation of the power supplied during playback of audio in a given loudspeaker...... is obtained by considering a wide range of audio source material, loudness normalization of the source material, crossover ltering, driver characteristics as well as a perceived maximum loudness/volume level. The results from analysing a sub-woofer and a woofer reveals the peak power, peak voltage, peak...... current and apparent power - thus providing a solid foundation for a requirement specication....

  15. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Chinese Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  16. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (French Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  17. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Arabic Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  18. Neutronics requirements for a DEMO fusion power plant

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, U., E-mail: ulrich.fischer@kit.edu [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Bachmann, C. [EUROfusion Consortium , Boltzmannstraße 2, 85748 Garching (Germany); Palermo, I. [Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT), Madrid (Spain); Pereslavtsev, P. [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Villari, R. [ENEA UT-FUS C.R. Frascati, Via E. Fermi 45, 00044 Frascati (Italy)

    2015-10-15

    Highlights: • Discussion and specification of neutronic requirements for a DEMO power plant. • TBR uncertainties are reviewed/discussed and design margins are elaborated. • Limits are given for radiation loads to super-conducting magnets and steel structural components. • Available DEMO results are compared to recommended limits and TBR design target. - Abstract: This paper addresses the neutronic requirements a DEMO fusion power plant needs to fulfil for a reliable and safe operation. The major requirement is to ensure Tritium self-sufficiency taking into account the various uncertainties and plant-internal losses that occur during DEMO operation. A further major requirement is to ensure sufficient protection of the superconducting magnets against the radiation penetrating in-vessel components and vessel. Reliable criteria for the radiation loads need to be defined and verified to ensure the reliable operation of the magnets over the lifetime of DEMO. Other issues include radiation induced effects on structural materials such as the accumulated displacement damage, the generation of gases such as helium which may deteriorate the material performance. The paper discusses these issues and their impact on design options for DEMO taking into account results obtained in the frame of European Power Plant Physics and Technology (PPPT) 2013 programme activities with DEMO models employing the helium cooled pebble bed (HCPB), the helium cooled lithium lead (HCLL), and the water-cooled (WCLL) blanket concepts.

  19. Use of fuel cells to meet military requirements for mobile power

    International Nuclear Information System (INIS)

    Andrukaitis, E.

    2004-01-01

    'Full text:' The use of fuel cell technology in military applications will depend on safe, high energy density systems being developed. An important part of using this technology is also the development of alternative hydrogen producing fuels with high energy densities and are easy to transport. Fuel cells are now a very large R and D effort for several military applications around the world. The major reason is because of the high power demands needed requires electrical energy sources that far exceed the capabilities of batteries currently being fielded for portable applications. Fuel cells are regarded as highly efficient, tactical energy converters that can be adapted for wide range of power requirements. They are potentially the lowest weight power source when coupled with batteries or capacitors to form hybrid systems. Generally electrical power is needed to support a number of applications from ultra-high power for electrical pulses (radios, sensors) to reliable, conditioned power for command and control systems. In the future, sustained power for electric drive systems, will also be required. Some of the promising applications in the military and the R and D challenges that remain to reach performance and reliability targets suitable for military requirements will be discussed. (author)

  20. Power requirements assessment for lunar and Mars scientific and experimental payloads

    International Nuclear Information System (INIS)

    Kotas, J.F.

    1992-01-01

    This paper reports on an evaluation of prospective scientific payloads and surface experiments for future manned missions to the moon and Mars which determined that overall mission objectives and requirements influence the selection of candidate power systems. A generic classification of these science missions was developed to examine these relationships. Scientific missions were defined for the four Synthesis Report architectures and cumulative power load and payload mix computed. Approximately half of all deployed science payloads were sited within the main surface outpost and powered by the central power generation facility. The remaining remote science payloads require either autonomous or smaller central power facilities

  1. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license... 10 Energy 2 2010-01-01 2010-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF...

  2. Improvement of uranium production efficiency to meet China's nuclear power requirements

    International Nuclear Information System (INIS)

    Zhang, R.

    1997-01-01

    Recently China put the Qinshan Nuclear Power Plant, with an installed capacity of 300 MW, in the province of Zhejiang and the Daya Bay Nuclear Power Plant, with a total installed capacity of 2 x 900 MW, in commercial operation. China plans a rapid growth in nuclear power from 1995 to 2010. China's uranium production will therefore also enter a new period with nuclear power increasing. In order to meet the demand of nuclear power for uranium special attention has been paid to both technical progress improvement using management with the aim of reducing the cost of uranium production. The application of the trackless mining technique has enhanced the uranium mining productivity significantly. China has produced a radiometric sorter, model 5421-2 for pre-concentrating uranium run-of-mine ore. This effectively increases the uranium content in mill feed and decreases the operating cost of hydrometallurgical treatment. The in situ leach technique after blasting is applied underground in the Lantian Mine, in addition to the surface heap leaching, and has obtained a perfect result. The concentrated acid-curing, and ferric sulphate trickle leaching process, will soon be used in commercial operation for treating uranium ore grading -5 to -7 mm in size. The annual production capability of the Yining Mine will be extended to 100 tonnes U using improving in situ leaching technology. For the purpose of improving the uranium production efficiency much work has been done optimizing the distribution of production centres. China plans to expand its uranium production to meet the uranium requirements of the developing nuclear power plants. (author). 4 tabs

  3. Research on prediction of agricultural machinery total power based on grey model optimized by genetic algorithm

    Science.gov (United States)

    Xie, Yan; Li, Mu; Zhou, Jin; Zheng, Chang-zheng

    2009-07-01

    Agricultural machinery total power is an important index to reflex and evaluate the level of agricultural mechanization. It is the power source of agricultural production, and is the main factors to enhance the comprehensive agricultural production capacity expand production scale and increase the income of the farmers. Its demand is affected by natural, economic, technological and social and other "grey" factors. Therefore, grey system theory can be used to analyze the development of agricultural machinery total power. A method based on genetic algorithm optimizing grey modeling process is introduced in this paper. This method makes full use of the advantages of the grey prediction model and characteristics of genetic algorithm to find global optimization. So the prediction model is more accurate. According to data from a province, the GM (1, 1) model for predicting agricultural machinery total power was given based on the grey system theories and genetic algorithm. The result indicates that the model can be used as agricultural machinery total power an effective tool for prediction.

  4. International comparison of requirements for connection of wind turbines to power systems

    Energy Technology Data Exchange (ETDEWEB)

    Jauch, C. [Risoe National Lab., Roskilde (Denmark). Dept. of Wind Energy; Matevosyan, J.; Ackermann, T. [Royal Inst. of Technology, Stockholm (Sweden). Dept. of Electrical Engineering; Bolik, S. [Vestas Wind Systems A/S, Ringkoebing (Denmark)

    2005-07-01

    Power production from wind turbines has increased considerably during the last decade. Therefore today's wind turbines, which are typically set up in wind farms, have a significant influence on the operation of power systems. The efficient and secure operation of power systems is supported by grid codes, which are sets of requirements for all network users (suppliers, customers, etc.). In Europe, several transmission network operators have introduced special grid connection requirements for wind farms. These requirements are mainly based on existing grid codes, initially written for conventional power plants usually equipped with synchronous generators. This article presents a comparison of grid connection requirements for wind farms issued, or proposed as a draft, by transmission network operators in Denmark, Sweden, Germany, Scotland and Ireland. (author)

  5. Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

    Directory of Open Access Journals (Sweden)

    Julius Schnabel

    2016-01-01

    Full Text Available Photovoltaic (PV generators suffer from fluctuating output power due to the highly fluctuating primary energy source. With significant PV penetration, these fluctuations can lead to power system instability and power quality problems. The use of energy storage systems as fluctuation compensators has been proposed as means to mitigate these problems. In this paper, the behavior of PV power fluctuations in Northern European climatic conditions and requirements for sizing the energy storage systems to compensate them have been investigated and compared to similar studies done in Southern European climate. These investigations have been performed through simulations that utilize measurements from the Tampere University of Technology solar PV power station research plant in Finland. An enhanced energy storage charging control strategy has been developed and tested. Energy storage capacity, power, and cycling requirements have been derived for different PV generator sizes and power ramp rate requirements. The developed control strategy leads to lesser performance requirements for the energy storage systems compared to the methods presented earlier. Further, some differences on the operation of PV generators in Northern and Southern European climates have been detected.

  6. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication

  7. Current trends in codal requirements for safety in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Srivasista, K.; Shah, Y.K.; Gupta, S.K.

    2006-01-01

    The Code of practice on safety in nuclear power plant operation states the requirements to be met during operation of a nuclear power plant for assuring safety. Among various stages of authorization, regulatory body issues authorization for operation of a nuclear power plant, monitors and enforces regulatory requirements. The responsible organization shall have overall responsibility and the plant management shall have the primary responsibility for ensuring safe and efficient operation of its nuclear power plants. A set of codal requirements covering technical and administrative aspects are mandatory for the plant management to implement to ensure that the nuclear power plant is operated in accordance with the design intent. Requirements on operating procedures and instructions establish operation and maintenance, inspection and testing of the plant in a planned and systematic way. The requirements on emergency preparedness programme establish with a reasonable assurance that, in the event of an emergency situation, appropriate measures can be taken to mitigate the consequences. Commissioning requirements verify performance criteria during commissioning to ensure that the design intent and QA requirements are met. Several modifications in systems important to safety required during operation of a nuclear power plant are regulated. However new operational codal requirements arising out of periodic safety review, operational experience feedback, life management, probabilistic safety assessment, physical security, safety convention and obligations and decommissioning are not covered in the present code of practice for safety in nuclear power plant operation. Codal provisions on 'Review by operating organization on aspects of design having implications on operability' are also required to be addressed. The merits in developing such a methodology include acceptance of the design by operating organization, ensuring maintainability, proper layout etc. in the new designs

  8. RF Power Requirements for PEFP SRF Cavity Test

    International Nuclear Information System (INIS)

    Kim, Han Sung; Seol, Kyung Tae; Kwon, Hyeok Jung; Cho, Yong Sub

    2011-01-01

    For the future extension of the PEFP (Proton Engineering Frontier Project) Proton linac, preliminary study on the SRF (superconducting radio-frequency) cavity is going on including a five-cell prototype cavity development to confirm the design and fabrication procedures and to check the RF and mechanical properties of a low-beta elliptical cavity. The main parameters of the cavity are like followings. - Frequency: 700 MHz - Operating mode: TM010 pi mode - Cavity type: Elliptical - Geometrical beta: 0.42 - Number of cells: 5 - Accelerating gradient: 8 MV/m - Epeak/Eacc: 3.71 - Bpeak/Eacc: 7.47 mT/(MV/m) - R/Q: 102.3 ohm - Epeak: 29.68 MV/m (1.21 Kilp.) - Geometrical factor: 121.68 ohm - Cavity wall thickness: 4.3 mm - Stiffening structure: Double ring - Effective length: 0.45 m For the test of the cavity at low temperature of 4.2 K, many subsystems are required such as a cryogenic system, RF system, vacuum system and radiation shielding. RF power required to generate accelerating field inside cavity depends on the RF coupling parameters of the power coupler and quality factor of the SRF cavity and the quality factor itself is affected by several factors such as operating temperature, external magnetic field level and surface condition. Therefore, these factors should be considered to estimate the required RF power for the SRF cavity test

  9. A computerized total-radiation management system for Shikoku Electric Power's Ikata nuclear-power plant

    International Nuclear Information System (INIS)

    Hirao, Toshiyuki; Sakakihara, Tetsuro; Tanabe, Shozo; Kano, Mamoru; Hoshi, Jun-ichi.

    1985-01-01

    This system allows on-line, real-time radiation management at nuclear-power plants. It increases management precision, decreases management workloads, and saves labor in operations that previously required specialized technicians to expend great amounts of time and effort on radiation management at facilities and their environments, environmental radiation evaluation, and control of radioactive waste. The article outlines the already installed system. (author)

  10. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  11. Power Consumption and Calculation Requirement Analysis of AES for WSN IoT.

    Science.gov (United States)

    Hung, Chung-Wen; Hsu, Wen-Ting

    2018-05-23

    Because of the ubiquity of Internet of Things (IoT) devices, the power consumption and security of IoT systems have become very important issues. Advanced Encryption Standard (AES) is a block cipher algorithm is commonly used in IoT devices. In this paper, the power consumption and cryptographic calculation requirement for different payload lengths and AES encryption types are analyzed. These types include software-based AES-CB, hardware-based AES-ECB (Electronic Codebook Mode), and hardware-based AES-CCM (Counter with CBC-MAC Mode). The calculation requirement and power consumption for these AES encryption types are measured on the Texas Instruments LAUNCHXL-CC1310 platform. The experimental results show that the hardware-based AES performs better than the software-based AES in terms of power consumption and calculation cycle requirements. In addition, in terms of AES mode selection, the AES-CCM-MIC64 mode may be a better choice if the IoT device is considering security, encryption calculation requirement, and low power consumption at the same time. However, if the IoT device is pursuing lower power and the payload length is generally less than 16 bytes, then AES-ECB could be considered.

  12. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  13. Power plant allocation in East Kalimantan considering total cost and emissions

    Science.gov (United States)

    Muslimin; Utomo, D. S.

    2018-04-01

    The fulfillment of electricity need in East Kalimantan is the responsibility of State Electricity Company/Perusahaan Listrik Negara (PLN). But PLN faces constraints in the lack of generating capacity it has. So the allocation of power loads in East Kalimantan has its own challenges. Additional power supplies from other parties are required. In this study, there are four scenarios tested to meet the electricity needs in East Kalimantan with the goal of minimizing costs and emissions. The first scenario is only by using PLN power plant. The second scenario is by combining PLN + Independent Power Producer (IPP) power plants. The third scenario is by using PLN + Rented power plants. The fourth scenario is by using PLN + Excess capacity generation. Numerical experiment using nonlinear programming is conducted with the help of the solver. The result shows that in the peak load condition, the best combination is scenario 2 (PLN + IPP). While at the lowest load condition, the cheapest scenario is PLN + IPP while the lowest emission is PLN + Rent.

  14. Supplying the power requirements to a sensor network using radio frequency power transfer.

    Science.gov (United States)

    Percy, Steven; Knight, Chris; Cooray, Francis; Smart, Ken

    2012-01-01

    Wireless power transmission is a method of supplying power to small electronic devices when there is no wired connection. One way to increase the range of these systems is to use a directional transmitting antenna, the problem with this approach is that power can only be transmitted through a narrow beam and directly forward, requiring the transmitter to always be aligned with the sensor node position. The work outlined in this article describes the design and testing of an autonomous radio frequency power transfer system that is capable of rotating the base transmitter to track the position of sensor nodes and transferring power to that sensor node. The system's base station monitors the node's energy levels and forms a charge queue to plan charging order and maintain energy levels of the nodes. Results show a radio frequency harvesting circuit with a measured S11 value of -31.5 dB and a conversion efficiency of 39.1%. Simulation and experimentation verified the level of power transfer and efficiency. The results of this work show a small network of three nodes with different storage types powered by a central base node.

  15. Supplying the Power Requirements to a Sensor Network Using Radio Frequency Power Transfer

    Directory of Open Access Journals (Sweden)

    Steven Percy

    2012-06-01

    Full Text Available Wireless power transmission is a method of supplying power to small electronic devices when there is no wired connection. One way to increase the range of these systems is to use a directional transmitting antenna, the problem with this approach is that power can only be transmitted through a narrow beam and directly forward, requiring the transmitter to always be aligned with the sensor node position. The work outlined in this article describes the design and testing of an autonomous radio frequency power transfer system that is capable of rotating the base transmitter to track the position of sensor nodes and transferring power to that sensor node. The system’s base station monitors the node’s energy levels and forms a charge queue to plan charging order and maintain energy levels of the nodes. Results show a radio frequency harvesting circuit with a measured S11 value of −31.5 dB and a conversion efficiency of 39.1%. Simulation and experimentation verified the level of power transfer and efficiency. The results of this work show a small network of three nodes with different storage types powered by a central base node.

  16. Forecast of wind energy production and ensuring required balancing power

    International Nuclear Information System (INIS)

    Merkulov, M.

    2010-01-01

    The wind energy is gaining larger part of the energy mix around the world as well as in Bulgaria. Having in mind the irregularity of the wind, we are in front of a challenge for management of the power grid in new unknown conditions. The world's experience has proven that there could be no effective management of the grid without forecasting tools, even with small scale of wind power penetration. Application of such tools promotes simple management of large wind energy production and reduction of the quantities of required balancing powers. The share of the expenses and efforts for forecasting of the wind energy is incomparably small in comparison with expenses for keeping additional powers in readiness. The recent computers potential allow simple and rapid processing of large quantities of data from different sources, which provides required conditions for modeling the world's climate and producing sophisticated forecast. (author)

  17. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  18. Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Ramsden, T.

    2013-04-01

    This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

  19. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  20. Full-sky formulae for weak lensing power spectra from total angular momentum method

    International Nuclear Information System (INIS)

    Yamauchi, Daisuke; Taruya, Atsushi; Namikawa, Toshiya

    2013-01-01

    We systematically derive full-sky formulae for the weak lensing power spectra generated by scalar, vector and tensor perturbations from the total angular momentum (TAM) method. Based on both the geodesic and geodesic deviation equations, we first give the gauge-invariant expressions for the deflection angle and Jacobi map as observables of the CMB lensing and cosmic shear experiments. We then apply the TAM method, originally developed in the theoretical studies of CMB, to a systematic derivation of the angular power spectra. The TAM representation, which characterizes the total angular dependence of the spatial modes projected along a line-of-sight, can carry all the information of the lensing modes generated by scalar, vector, and tensor metric perturbations. This greatly simplifies the calculation, and we present a complete set of the full-sky formulae for angular power spectra in both the E-/B-mode cosmic shear and gradient-/curl-mode lensing potential of deflection angle. Based on the formulae, we give illustrative examples of non-vanishing B-mode cosmic shear and curl-mode of deflection angle in the presence of the vector and tensor perturbations, and explicitly compute the power spectra

  1. Bruce Power's nuclear pressure boundary quality assurance program requirements, implementation and transition

    International Nuclear Information System (INIS)

    Krane, J.C.

    2009-01-01

    The development of a full scope nuclear pressure boundary quality assurance program in Canada requires extensive knowledge of the structure and detailed requirements of codes and standards published by the Canadian Standards Association (CSA) and American Society of Mechanical Engineers (ASME). Incorporation into company governance documents and implementation of these requirements while managing the transition to more recent revisions of these codes and standards represents a significant challenge for Bruce Power, Canada's largest independent nuclear operator. This paper explores the key developments and innovative changes that are used to ensure successful regulatory compliance and effective implementation of the Bruce Power Pressure Boundary Quality Assurance Program. Challenges and mitigating strategies to sustain this large compliance based program at Bruce Power's 8 unit nuclear power plant site will also be detailed. (author)

  2. Requirements under decree 430 UJD for unit outlet and standby power supply

    International Nuclear Information System (INIS)

    Vanco, K.

    2012-01-01

    At present, the nuclear power plants are only sufficient resources, which can cover a huge demand for electricity. Concentration so huge power in one place require adequate security from the perspective lead power outlet and standby power supply of reactor unit. (Author)

  3. Regulatory requirement of the Juragua nuclear Power Plant PSA

    International Nuclear Information System (INIS)

    Valhuerdi Debesa, C.

    1996-01-01

    Probabilistic Safety Assessment has proved to be a powerful tool for improving the knowledge of the safety insides of Nuclear Power Plants and increasing the efficiency of the safety measures adopted by both operators and regulators. In this paper the regulatory approach adopted in Cuba with regard to the PSA , the scope of the requirement and the basis and proposal of this decision are presented

  4. Manpower requirements in the nuclear power industry, 1982-1991

    International Nuclear Information System (INIS)

    Johnson, R.C.

    1982-09-01

    The objective of this study is to project occupational employment needs, created by growth and employee turnover, for the nuclear power industry over the next decade. Employment data for 1981 were collected in a survey conducted by the Institute of Nuclear Power Operations of its 60 member utilities. The data were analyzed statistically to identify factors that account for variations in power plant staffing and the number of off-site nuclear support personnel employed by a utility. Total employment in the nuclear power industry is predicted to increase from 54,400 in 1981 to 73,600 in 1991. Nuclear generating capacity will increase from 58 to 124 gigawatts, based on the midline forecast of the Energy Information Administration. The projections assume that current regulations will remain in effect and no new plans for additional generating facilities will be initiated

  5. In-core power sharing and fuel requirement study for a decommissioning Boiling Water Reactor using the linear reactivity model

    International Nuclear Information System (INIS)

    Chen, Chung-Yuan; Tung, Wu-Hsiung; Yaur, Shung-Jung; Kuo, Weng-Sheng

    2014-01-01

    Highlights: • Linear reactivity model (LRM) was modified and applied to Boiling Water Reactor. • The power sharing and fuel requirement study of the last cycle and two cycles before decommissioning was implemented. • The loading pattern design concept for the cycles before decommissioning is carried out. - Abstract: A study of in-core power sharing and fuel requirement for a decommissioning BWR (Boiling Water Reactor) was carried out using the linear reactivity model (LRM). The power sharing of each fuel batch was taken as an independent variable, and the related parameters were set and modified to simulate actual cases. Optimizations of the last cycle and two cycles before decommissioning were both implemented; in the last-one-cycle optimization, a single cycle optimization was carried out with different upper limits of fuel batch power, whereas, in the two-cycle optimization, two cycles were optimized with different cycle lengths, along with two different optimization approaches which are the simultaneous optimization of two cycles (MO) and two successive single-cycle optimizations (SO). The results of the last-one-cycle optimization show that it is better to increase the fresh fuel power and decrease the thrice-burnt fuel power as much as possible. It also shows that relaxing the power limit is good to the fresh fuel requirement which will be reduced under lower power limit. On the other hand, the results of the last-two-cycle (cycle N-1 and N) optimization show that the MO is better than SO, and the power of fresh fuel batch should be decreased in cycle N-1 to save its energy for the next cycle. The results of the single-cycle optimization are found to be the same as that in cycle N of the multi-cycle optimization. Besides that, under the same total energy requirement of two cycles, a long-short distribution of cycle length design can save more fresh fuel

  6. Empirical Models for Power and Energy Requirements II : A Powered Implement Operation in Serdang Sandy Clay Loam, Malaysia

    Directory of Open Access Journals (Sweden)

    A. F. Kheiralla

    2017-12-01

    Full Text Available Power and energy requirements were measured with an instrumented tractor for rotary tilling in Serdang sandy clay loam soil.  The effects of travel speed and rotor speed upon the measured data were investigated.  Power model from orthogonal regression analysis was formulated based on linear and quadratic functions of travel speed and bite length.  Fuel consumption model from regression analysis was formulated based on linear tractor PTO power as well as linear equivalent tractor PTO power.  Fuel consumption rates predicted by ASAE D497.3 were found to be 25% to 28% overestimates of the values predicted by the model developed.  However, fuel consumption rates reported by OECD Tractor Test were found to be 1% to 9% lower than the fuel consumption rates predicted by the model developed.  A comparison of power and energy requirements for both powered and draught implements showed that the disk harrow was the most energy efficient implement in terms of fuel consumption and specific energy followed by the rotary tiller, disk plough and mouldboard.  Finally, average PTO power, fuel consumption, wheel slip, wheel power and specific energy for a powered implement are presented.

  7. Validation of Power Requirement Model for Active Loudspeakers

    DEFF Research Database (Denmark)

    Schneider, Henrik; Madsen, Anders Normann; Bjerregaard, Ruben

    2015-01-01

    . There are however many advantages that could be harvested from such knowledge like size, cost and efficiency improvements. In this paper a recently proposed power requirement model for active loudspeakers is experimentally validated and the model is expanded to include the closed and vented type enclosures...

  8. Requirement profile for nuclear power station personnel

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1984-01-01

    The starting point in deriving the requirement profile for the shift personnel in the control rooms of nuclear power stations is information of a technical, organisational and ergonomic kind. The technique used, the distribution of work to different work areas and the configuration of the workplace is determined by the tasks and the environmental conditions in which they have to be done. (orig./DG) [de

  9. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  10. Overall quality assurance program requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1992-09-01

    This standard contains the requirements for the owner's overall quality assurance program for a nuclear power plant. This program encompasses all phases of a nuclear power plant life cycle, including site evaluation, design, procurement, manufacturing, construction and installation, commissioning, operation, and decommissioning. It covers the activities associated with specifying, directing, and administering the work to be done during these phases, and the evaluation and integrated of the activities and programs of participants

  11. Laser-powered lunar base

    International Nuclear Information System (INIS)

    Costen, R.; Humes, D.H.; Walker, G.H.; Williams, M.D.; Deyoung, R.J.

    1989-01-01

    The objective was to compare a nuclear reactor-driven Sterling engine lunar base power source to a laser-to-electric converter with orbiting laser power station, each providing 1 MW of electricity to the lunar base. The comparison was made on the basis of total mass required in low-Earth-orbit for each system. This total mass includes transportation mass required to place systems in low-lunar orbit or on the lunar surface. The nuclear reactor with Sterling engines is considered the reference mission for lunar base power and is described first. The details of the laser-to-electric converter and mass are discussed. The next two solar-driven high-power laser concepts, the diode array laser or the iodine laser system, are discussed with associated masses in low-lunar-orbit. Finally, the payoff for laser-power beaming is summarized

  12. Hypothetical requirements on number of personnel in Czechoslovak nuclear power plants

    International Nuclear Information System (INIS)

    Halik, J.

    1990-01-01

    The structural changes of Czechoslovak power prevent prediction of labor force development by extrapolating the existing development trends. Nuclear power demands a different qualification and occupation structure of the labor force than conventional power generation. The prediction of the number of personnel is based on data on the expected installed capacity and on its commissioning. The following organizational structures are envisaged for a nuclear power plant: the divisions of the Director, of production, maintenance, radiation safety and quality control, technology and investment, economics and personnel. A total of 15,654 personnel are envisaged for nuclear power plants in 2005. A brief comparison is submitted of labor demands in nuclear power plants in Czechoslovakia and in the world. (M.D.). 1 fig., 4 tabs., 3 refs

  13. Recommended general safety requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1983-06-01

    This report presents recommendations for a set of general safety requirements that could form the basis for the licensing of nuclear power plants by the Atomic Energy Control Board. In addition to a number of recommended deterministic requirements the report includes criteria for the acceptability of the design of such plants based upon the calculated probability and consequence (in terms of predicted radiation dose to members of the public) of potential fault sequences. The report also contains a historical review of nuclear safety principles and practices in Canada

  14. International requirements for life extension of nuclear power plants

    International Nuclear Information System (INIS)

    Wernicke, Robert

    2009-01-01

    Lifetime extension or long-term operation of nuclear facilities are topics of great international significance against the backdrop of a fleet of nuclear power plants of which many have reached 2/3 of their planned life. The article deals with the conditions for, and the specific requirements of, seeking long-term operation of nuclear power plants as established internationally and on the basis of IAEA collections. Technically, long-term operation is possible for many of the nuclear power plants in the world because, normally, they were built on the basis of conservative rules and regulations and, as a consequence, incorporate significant additional safety. Application of requirements to specific plants implies assessments of technical safety which show that conservative design philosophies created reserves and, as a consequence, there is an adequate level of safety also in long-term plant operation. For this purpose, the technical specifications must be revised, necessary additions made, and (international) operating experience taken into account and management of aging established. Two examples are presented to show how the approach to long-term plant operation is put into practice on a national level. (orig.)

  15. Evaluation of the energy required for constructing and operating a fusion power plant

    International Nuclear Information System (INIS)

    Buende, R.

    1982-09-01

    The energy required for constructing and operating a tokamak fusion power plant is appraised with respect to the energy output during the lifetime of the plant. A harvesting factor is deduced as a relevant figure of energetic merit and is used for a comparison between fusion, fission, and coal-fired power plants. Because fusion power plants involve considerable uncertainties the comparison is supplemented by a sensitivity analysis. In comparison with Light Water Reactor plants fusion power plants appear to be rather favourable in this respect. The energy required for providing the fuel is relatively low for fusion plants, thus overcompensating the considerable higher amount of energy necessary for constructing the fusion power plant. (orig.)

  16. Reassessment and suspension of the nuclear power plant design requirement of the constraint of collective dose per unit of practice. (Requirement 6 (b), Standard AR 3.1.2)

    International Nuclear Information System (INIS)

    Amado, Valeria A.; Canoba, Analia C.; Curti, Adriana R.; Biaggio, Alfredo L.

    2009-01-01

    By the middle of 2005, the Nuclear Regulatory Authority (ARN) decided to re-assess the basis of a design requirement applicable to the limitation of nuclear power reactor radioactive discharges. Such requirement, aimed at restricting the discharge of globally dispersed long-lived radionuclides, was in force in Argentina since 1979 and was expressed as a limitation of the collective dose commitment per unit of electrical energy generated. The practical result of such regulatory action was the need to retain C-14 in the Atucha II power reactor under construction as well as in future heavy water reactors to be built in the country, and, later on, to manage it as to assure its isolation from the biosphere during an appropriate period of time. For the above-mentioned reassessment, an ad hoc task group was created and an internal report was presented to the Board of Directors by the middle of 2007. Because of such report the ARN decided to suspend the application of the requirement (i.e. it is not more mandatory, even for Atucha II). The present work presents the main aspects of that report. In particular, it explains the basis of the design requirement and the most important assumptions that triggered it. The differences between the assumptions made at that time and the reality of nuclear power generation at the beginning of the 21st Century, as well as their implications in relation to the requirement are described, including the Suess effect and its impact in the total dose due to C-14. Finally, after explaining in detail the facts that made no longer reasonable to keep in force the above mentioned requirement, the work presents the conclusions that lead the ARN to the suspension of this requirement. (author) [es

  17. Generating units performances: power system requirements

    Energy Technology Data Exchange (ETDEWEB)

    Fourment, C; Girard, N; Lefebvre, H

    1994-08-01

    The part of generating units within the power system is more than providing power and energy. Their performance are not only measured by their energy efficiency and availability. Namely, there is a strong interaction between the generating units and the power system. The units are essential components of the system: for a given load profile the frequency variation follows directly from the behaviour of the units and their ability to adapt their power output. In the same way, the voltage at the units terminals are the key points to which the voltage profile at each node of the network is linked through the active and especially the reactive power flows. Therefore, the customer will experience the frequency and voltage variations induced by the units behaviour. Moreover, in case of adverse conditions, if the units do not operate as well as expected or trip, a portion of the system, may be the whole system, may collapse. The limitation of the performance of a unit has two kinds of consequences. Firstly, it may result in an increased amount of not supplied energy or loss of load probability: for example if the primary reserve is not sufficient, a generator tripping may lead to an abnormal frequency deviation, and load may have to be shed to restore the balance. Secondly, the limitation of a unit performance results in an economic over-cost for the system: for instance, if not enough `cheap` units are able to load-following, other units with higher operating costs have to be started up. We would like to stress the interest for the operators and design teams of the units on the one hand, and the operators and design teams of the system on the other hand, of dialog and information exchange, in operation but also at the conception stage, in order to find a satisfactory compromise between the system requirements and the consequences for the generating units. (authors). 11 refs., 4 figs.

  18. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  19. Reactor power control device

    International Nuclear Information System (INIS)

    Doi, Kazuyori.

    1981-01-01

    Purpose: To automatically control the BWR type reactor power by simple and short-time searching the load pattern nearest to the required pattern at a nuclear power plant side. Constitution: The reactor power is automatically regulated by periodical modifying of coefficients fitting to a reactor core model, according as a required load pattern. When a load requirement pattern is given, a simulator estimates the total power change and the axial power distribution change from a xenon density change output calculated by a xenon dynamic characteristic estimating device, and a load pattern capable of being realized is searched. The amount to be recirculated is controlled on the basis of the load patteren thus searched, and the operation of the BWR type reactor is automatically controlled at the side of the nuclear power plant. (Kamimura, M.)

  20. Parameterized Flight Mission for Secondary Power Requirement Estimations of Commercial Transport Aircraft

    OpenAIRE

    Lampl, Thomas; Muschkorgel, Sandra; Hornung, Mirko;

    2018-01-01

    The trend towards More-Electric Aircraft (MEA) and the introduction of new system technologies lead to considerable changes at the system level of commercial transport aircraft. Because the number of systems and power requirements are increasing, the consideration and integration of aircraft systems in early aircraft design phases is important. The objective of this contribution is to develop a characteristic flight mission with modelled aircraft systems to estimate the secondary power requir...

  1. OVERVIEW OF THE RHIC INSERTION REGION, SEXTUPOLE, AND SNAKE POWER SUPPLY SYSTEMS

    International Nuclear Information System (INIS)

    BRUNO, D.; ENG, W.; GANETIS, G.; LAMBIASE, R.F.; SANDBERG, J.

    2001-01-01

    The Relativistic Heavy Ion Collider (RHIC) was commissioned in 1999 and 2000. RHIC requires power supplies to supply currents to highly inductive superconducting magnets. The RHIC Insertion Region (IR) contains many shunt power supplies to trim the current of different magnet elements in a large superconducting magnet circuit. There are a total of 237 Insertion Region power supplies in both RHIC rings. RHIC also requires sextupole power supplies. One sextupole power supply is connected across 12 sextupole magnets. There are a total of 24 sextupole power supplies in both rings. Snake magnets are also a part of the RHIC ring, and these snake magnets also require power supplies. There shall be a total of 24 snake power supplies in both rings. Power supply technology, connections, control systems and interfacing with the Quench Protection System will be presented

  2. Total quality control: the deming management philosophy applied to nuclear power plants

    International Nuclear Information System (INIS)

    Heising, C.D.; Wetherell, D.L.; Melhem, S.A.; Sato, M.

    1987-01-01

    In recent years, a call has come for the development of inherently safe nuclear reactor systems that cannot have large-scale accidents. In the search for the perfect inherently safe reactor system, some are calling for the institution of computerized automated control of reactors eliminating most human operators from the control room. A different approach to the problem of the control of inherently safe reactors is that both future and present nuclear power plants need to institute total quality control (TQC) to plant operations and management. The Deming management philosophy of TQC has been implemented in a wide range of industries - particularly in Japan and the US. Specific attention is given, however, to TQC implementation in the electric power industry as applied to nuclear plants. The Kansai Electric Power Company and Florida Power and Light Company have recently implemented TQC. Statistical quality control methods have been applied to monitor and control reactor variables (for example, to the steam generator water level important to start-up operations of pressurized water reactors)

  3. Human Resources Requirements for New Nuclear Power Programs

    International Nuclear Information System (INIS)

    Goodnight, Charles T.

    2014-01-01

    Summary: Planning to Meet HR Requirements for New Nuclear Power Programs Must Begin Early. Many years of preparation are required before the “Right Number of the Right People” … will be … “In the Right Place at the Right Time”. • Seven key steps which must be taken include: 1) Identify detailed Human Resources requirements, based on the selected site and reactor design; 2) Conduct an assessment of national capacity to develop and/or provide those resources; 3) Conduct a Gap Analysis to determine what additional steps will be needed to fill any capacity shortfalls; 4) Develop initial and recurring recruiting and training plans; 5) Begin recruiting and training; 6) Review and adjust as personnel move and/or leave; 7) Ensure adequate relationships are in place for sources of future recruiting

  4. The requirements and specific features related to power supply in telecommunications of Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Lubashenko, T. [Inst. Giprosvijaz, Kiev (Ukraine); Gordon, A. [ProElectro Ltd., Kiev (Ukraine)

    2000-07-01

    The article deals with the description of trends of power supplies in the telecommunication sector. The basic normative documents regarding the design of the power supplies are pointed out. The requirements concerning the design of the power supplies are outlined. The peculiarities of the power supplies in Ukrainian telecommunications are given. (orig.)

  5. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  6. Assessment of tritium breeding requirements for fusion power reactors

    International Nuclear Information System (INIS)

    Jung, J.

    1983-12-01

    This report presents an assessment of tritium-breeding requirements for fusion power reactors. The analysis is based on an evaluation of time-dependent tritium inventories in the reactor system. The method presented can be applied to any fusion systems in operation on a steady-state mode as well as on a pulsed mode. As an example, the UWMAK-I design was analyzed and it has been found that the startup inventory requirement calculated by the present method significantly differs from those previously calculated. The effect of reactor-parameter changes on the required tritium breeding ratio is also analyzed for a variety of reactor operation scenarios

  7. World power engineering. General review

    International Nuclear Information System (INIS)

    Alekseev, B.A.; Vol'fberg, D.B.; Ershevich, V.V.

    1989-01-01

    State and prospects of the world power engineering development are considered. Eelectricity production requires the greatest part of the world total energy consumption. The latter will grow and in future at the beginning of the next century it reaches 50%. The part of NPPs in 1986 constituted 12% in power and 16% in electricity production. In the middle of 1987 403 NPP units of 298 GW total power were in operation in the world; 138 units (123 GW) were under construction and 84 units (84 GW) were planed. In 1987 power units of 216 GW total power were put into operation. The largest NPPs are Fukushima (Japan) - 9.0 GW, Bruce(Canada) - 8.4 GW, Gravelines (France) - 5.56 GW

  8. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  9. Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq

    OpenAIRE

    Entisar K. Al-Geelawee; Anfal Nadhel Mohammed

    2016-01-01

    Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be a...

  10. Power requirements for superior H-mode confinement on Alcator C-Mod: experiments in support of ITER

    International Nuclear Information System (INIS)

    Hughes, J.W.; Reinke, M.L.; Terry, J.L.; Brunner, D.; Greenwald, M.; Hubbard, A.E.; LaBombard, B.; Lipschultz, B.; Ma, Y.; Wolfe, S.; Wukitch, S.J.; Loarte, A.

    2011-01-01

    Power requirements for maintaining sufficiently high confinement (i.e. normalized energy confinement time H 98 ≥ 1) in H-mode and its relation to H-mode threshold power scaling, P th , are of critical importance to ITER. In order to better characterize these power requirements, recent experiments on the Alcator C-Mod tokamak have investigated H-mode properties, including the edge pedestal and global confinement, over a range of input powers near and above P th . In addition, we have examined the compatibility of impurity seeding with high performance operation, and the influence of plasma radiation and its spatial distribution on performance. Experiments were performed at 5.4 T at ITER relevant densities, utilizing bulk metal plasma facing surfaces and an ion cyclotron range of frequency waves for auxiliary heating. Input power was scanned both in stationary enhanced D α (EDA) H-modes with no large edge localized modes (ELMs) and in ELMy H-modes in order to relate the resulting pedestal and confinement to the amount of power flowing into the scrape-off layer, P net , and also to the divertor targets. In both EDA and ELMy H-mode, energy confinement is generally good, with H 98 near unity. As P net is reduced to levels approaching that in L-mode, pedestal temperature diminishes significantly and normalized confinement time drops. By seeding with low-Z impurities, such as Ne and N 2 , high total radiated power fractions are possible, along with substantial reductions in divertor heat flux (>4x), all while maintaining H 98 ∼ 1. When the power radiated from the confined versus unconfined plasma is examined, pedestal and confinement properties are clearly seen to be an increasing function of P net , helping to unify the results with those from unseeded H-modes. This provides increased confidence that the power flow across the separatrix is the correct physics basis for ITER extrapolation. The experiments show that P net /P th of one or greater is likely to lead to H

  11. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... systems. (8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs...

  12. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  13. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  14. Normalized knee-extension strength or leg-press power after fast-track total knee arthroplasty

    DEFF Research Database (Denmark)

    Aalund, Peter K; Larsen, Kristian; Hansen, Torben Bæk

    2013-01-01

    OBJECTIVE: (s): To investigate which of the two muscle-impairment measures for the operated leg, normalized knee extension strength or leg press power, is more closely associated to performance-based and self-reported measures of function shortly following total knee arthroplasty (TKA). DESIGN...... and dynamic leg presses to determine their body-mass normalized knee extension strength and leg press power, respectively. The 10-m fast speed walking and 30-s chair stand tests were used to determine performance-based function, while the Western Ontario McMaster University Osteoarthritis Index (WOMAC......) and Oxford Knee scores were used to determine self-reported function. RESULTS: Normalized leg press power was more closely associated to both performance-based (r=.82, P...

  15. Power feature required for PEFC powered electric propulsion ship

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Isao [NKK Corp., Yokohama (Japan); Oka, Masaru [Mitsubishi Heavy Industries, Ltd., Nagasaki (Japan)

    1996-12-31

    This report covers part of a joint study on a PEFC system for ship propulsion, summarized in a presentation to this Seminar, entitled {open_quote}Study on a Polymer Electrolyte Fuel Cell (PEFC) Propulsion System for Surface Ships{close_quotes}, and which envisages application to a 1,500 DWT cargo vessel. The aspect treated here concerns an analysis of the load-following performance required and estimated of a PEFC system to power the envisaged ship. The analysis proved that difficulty should be expected of the fuel supply circuit in following with adequate rapidity the sharp changes of load on fuel cell under certain conditions. Further integrated experiments and simulation exercises are currently in progress to further analyze the response characteristics of the fuel supply circuit-particularly of the methanol reformer and gas reservoir-to determine the best measure to be adopted for overcoming the expected difficulty.

  16. Laser requirements for a laser fusion energy power plant

    Institute of Scientific and Technical Information of China (English)

    Stephen; E.Bodner; Andrew; J.Schmitt; John; D.Sethian

    2013-01-01

    We will review some of the requirements for a laser that would be used with a laser fusion energy power plant, including frequency, spatial beam smoothing, bandwidth, temporal pulse shaping, efficiency, repetition rate, and reliability. The lowest risk and optimum approach uses a krypton fluoride gas laser. A diode-pumped solid-state laser is a possible contender.

  17. The method of the correlation and dispersion defining of the total power components in the electric transport devices

    Directory of Open Access Journals (Sweden)

    A. V. Nikitenko

    2013-04-01

    Full Text Available Purpose. Development and theoretical ground of the analytical method for the calculation of the active, reactive and total powers in the electric traction devices, taking into consideration the non-stationary character of the stochastic processes change of the voltage and current in the elements of these systems. Methodology. The mathematical methods of the random processes theory and the “discrete electrical engineering” methods are used for solving the main problem of this paper. Findings. The Method of the Correlation and Dispersion is developed for definition of the active power, the reactive power by Fryse and the total power of the devices in the elements of the electric traction system of the main-line railways. The method is based on the well-known concepts of auto- and inter-correlation functions of the random processes which govern the feeder voltages and the currents in the traction power supply subsystem as well as the currents and voltages of the electric rolling stock. The method developed in this paper allows estimating the powers of both stationary and non-stationary processes. This method can be used for the analysis of both the traction mode and the regenerative braking mode of the electric rolling stock. The total power components were calculated for the one of the feeder areas of the Prydniprovsk railway using this method. The results show the significant flow of the reactive power in the traction power supply system. This fact is also confirmed by the high values of the reactive power coefficient. Originality. Scientific novelty of the research is consisted in the following. Firstly, for defining the active and reactive powers in elements of the traction power supply system the new method (the Method of Correlation and Dispersion is created and grounded. This method is different from other existing methods because it takes into consideration the varying non-stationary character of the chance processes of the feeder and

  18. The total release of xenon-133 from the Fukushima Dai-ichi nuclear power plant accident

    International Nuclear Information System (INIS)

    Stohl, Andreas; Seibert, Petra; Wotawa, Gerhard

    2012-01-01

    The accident at the Fukushima Dai-ichi nuclear power plant (FD-NPP) on 11 March 2011 released large amounts of radioactivity into the atmosphere. We determine the total emission of the noble gas xenon-133 ( 133 Xe) using global atmospheric concentration measurements. For estimating the emissions, we used three different methods: (i) using a purely observation-based multi-box model, (ii) comparisons of dispersion model results driven with GFS meteorological data with the observation data, and (iii) such comparisons with the dispersion model driven by ECMWF data. From these three methods, we have obtained total 133 Xe releases from FD-NPP of (i) 16.7 ± 1.9 EBq, (ii) 14.2 ± 0.8 EBq, and (iii) 19.0 ± 3.4 EBq, respectively. These values are substantially larger than the entire 133 Xe inventory of FD-NPP of about 12.2 EBq derived from calculations of nuclear fuel burn-up. Complete release of the entire 133 Xe inventory of FD-NPP and additional release of 133 Xe due to the decay of iodine-133 ( 133 I), which can add another 2 EBq to the 133 Xe FD-NPP inventory, is required to explain the atmospheric observations. Two of our three methods indicate even higher emissions, but this may not be a robust finding given the differences between our estimates. - Highlights: ► We determine the total release of xenon-133 from the Fukushima nuclear accident. ► We used global measurements and a box model, as well as dispersion model estimates. ► Total 133 Xe release is about 14.2-19 EBq, more than Fukushima 133 Xe inventory. ► Additional release of iodine-133 and decay into 133 Xe needed to explain results.

  19. Conditions and requirements for a potential application of solar power satellites /SPS/ for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Westphal, W. (Berlin, Technische Universitaet, Berlin, West Germany); Ruth, J. (ESA, European Space Research and Technology Centre, Noordwijk, Netherlands)

    1980-12-01

    The potential problems of a future introduction of Solar Power Satellites (SPS) as baseload power plants for Western European countries are considered, emphasizing the differences of SPS utilization in Europe compared with that in the USA as a result of geographical, orbital organizational, and industrial conditions. If estimated SPS safety zone areas are required, then the SPS system incorporating the 2.45 GHz microwave power transmission appears crucial for utilization in Western Europe in order to eliminate the large rectenna area requirements of an SPS 5 GW power system. A frequency variation of up to 5 or 10 GHz, and the application of either laser power transmission or solid state devices which could alleviate rectenna siting problems and restrictions on the use of the geosynchronous orbit are discussed.

  20. Requirements on future energy supply. Analysis on the demand of future power plant capacity and strategy for a sustainable power utilization in Germany

    International Nuclear Information System (INIS)

    2003-08-01

    This strategy paper was drawn up with a view to maximum ecological compatibility of pwer plant modernization and sustainable power generation and use. The first part of the paper analyzes the power plants to be decommissioned on a medium-term basis and - against the background of several different scenarios for future power demand - an estimate of power plant capacities required by 2020. The second part describes the goals and concrete requirements of sustainable energy use. In the final part, the available instruments are presented, and those instruments are recommended that will be best suited for making power demand and supply efficient, sustainable and environment-friend.y [de

  1. Report of the Committee to review safeguards requirements at power reactors

    International Nuclear Information System (INIS)

    1983-05-01

    In October 1982, NRC's Executive Director for Operations appointed a five-member Committee to review NRC security requirements at nuclear power plants with a view toward evaluating the impact of these requirements on operational safety. During visits to five power reactor sites and more than a dozen days of meetings over a period of four months, the Committee observed plant operating conditions and obtained views from abut 100 persons representing 16 nuclear utilities and industry organizations. They also interviewed about 40 NRC employees, including Resident Inspectors, and members of the Regional and Headquarters staffs. Overall, the Committee did not identify any clear operational safety problems associated with implementation of the NRC's security requirements. However, they did find that the potential existed, to varying degrees, at licensed facilities. The Committee's report, dated February 28, 1983, contains five basic findings and a number of associated recommendations intended to minimize the potential impact of security on safety

  2. Power system reliability impacts of wind generation and operational reserve requirements

    Directory of Open Access Journals (Sweden)

    Esteban Gil

    2015-06-01

    Full Text Available Due to its variability, wind generation integration presents a significant challenge to power system operators in order to maintain adequate reliability levels while ensuring least cost operation. This paper explores the trade-off between the benefits associated to a higher wind penetration and the additional operational reserve requirements that they impose. Such exploration is valued in terms of its effect on power system reliability, measured as an amount of unserved energy. The paper also focuses on how changing the Value of Lost Load (VoLL can be used to attain different reliability targets, and how wind power penetration and the diversity of the wind energy resource will impact quality of supply (in terms of instances of unserved energy. The evaluation of different penetrations of wind power generation, different wind speed profiles, wind resource diversity, and different operational reserve requirements, is conducted on the Chilean Northern Interconnected System (SING using statistical modeling of wind speed time series and computer simulation through a 24-hour ahead unit commitment algorithm and a Monte Carlo simulation scheme. Results for the SING suggest that while wind generation can significantly reduce generation costs, it can also imply higher security costs to reach acceptable reliability levels.

  3. An energy harvesting converter to power sensorized total human knee prosthesis

    International Nuclear Information System (INIS)

    Luciano, V; Sardini, E; Serpelloni, M; Baronio, G

    2014-01-01

    Monitoring the internal loads acting in a total knee prosthesis (TKP) is fundamental aspect to improve their design. One of the main benefits of this improvement is the longer duration of the tibial inserts. In this work, an electromagnetic energy harvesting system, which is implantable in a TKP, is presented. This is conceived for powering a future implantable system that is able to monitor the loads (and, possibly, other parameters) that could influence the working conditions of a TKP in real-time. The energy harvesting system (EHS) is composed of two series of NdFeB magnets, positioned into each condyle, and a coil that is placed in a pin of the tibial insert and connected to an implantable power management circuit. The magnetic flux variation and the induced voltage are generated by the knee's motion. A TKP prototype has been realized in order to reproduce the knee mechanics and to test the EHS performance. In the present work, the experimental results are obtained by adopting a resistive load of 2.2 kΩ, in order to simulate a real implanted autonomous system with a current consumption of 850 µA and voltage of 2 V. The tests showed that, after 7 to 30 s of walking with a gait cycle frequency of about 1.0 Hz, the EHS can generate an energy of about 70 μJ, guaranteeing a voltage between 2 and 1.4 V every 7.6 s. With this prototype we can verify that it is possible to power for 16 ms a circuit having a power consumption of 1.7 mW every 7.6 s. The proposed generator is a viable solution to power an implanted electronic system that is conceived for measuring and transmitting the TKP load parameters. (paper)

  4. Manpower requirements for nuclear power programmes in nations of intermediate capacity

    International Nuclear Information System (INIS)

    Cantarell, I.; Cerrolaza, J.A.; Llado, J.M.

    1980-01-01

    A study is made of the manpower required for initiating and carrying out a nuclear power programme in countries which have not developed their own nuclear technology but where the technical and economic level is such to permit a substantial input from local industry. The discussion is based on Spanish experience. The three basic elements in a nuclear programme are taken to be the operating company, the regulating authority and the engineering firm involved. The role of each of these is briefly considered and the manpower requirements during the design, construction and operational phases of a power station are evaluated. A short account is also given of the manpower requirements of other enterprises such as those involved in the civil engineering, the assembly and construction control. The variations in the labour force are described with the aim of deriving estimates of the number of people involved in the development of a nuclear power programme as a function of time: actual numbers are given for the case of the Spanish national energy plan. A brief description is given of the various courses on nuclear science and engineering provided in Spain and the requirements laid down by the regulations. A short account is given of Spanish nuclear development, with emphasis on the work carried out by the Nuclear Energy Board, not only as a research organization but also in its promotional and training capacities and as a source of personnel for industry. Finally, some comments are made on the possibilities opened up by international co-operation. (author)

  5. EUR, an European utility requirements documents for future LWR power stations

    International Nuclear Information System (INIS)

    Berbey, Pierre; Lienard, Michel; Redon, Ramon; Essmann, Juergen; Taylor, David T.

    2004-01-01

    A group of the major European utilities are developing a common requirement document which will be used for the LWR nuclear power plants to be built in Europe from the beginning of the next century. This document provides harmonised policies and technical requirements that will allow the implementation of a design developed in one country into another one. The objectives and contents of the document, the organisation set up for its production and the main requirements are summarised in the paper. (author)

  6. Calculations of total fusion power and spatial distribution of emissivity for a D-T thermal plasma

    International Nuclear Information System (INIS)

    Batistoni, P.; Pillon, M.

    1987-01-01

    The preliminary project of a diagnostic tool to measure the neutron emissivity profile for NET (Next European Torus) with an array of collimators is presented. With the help of a neutron transport code the maximum possible number of collimators, compatible with the crosstalk noise and the space available in the NET 2.2.B is determined within these constraints. An array of 17 collimators can be used, and some experimental results are simulated using a Monte Carlo code. These results are analyzed and an inversion procedure is used to obtain the emissivity profile and evaluate the total fusion power. The results show that the total fusion power can be measured within 10% for different emission profiles

  7. Structural materials requirements for in-vessel components of fusion power plants

    International Nuclear Information System (INIS)

    Schaaf, B. van der

    2000-01-01

    The economic production of fusion energy is determined by principal choices such as using magnetic plasma confinement or generating inertial fusion energy. The first generation power plants will use deuterium and tritium mixtures as fuel, producing large amounts of highly energetic neutrons resulting in radiation damage in materials. In the far future the advanced fuels, 3 He or 11 B, determine power plant designs with less radiation damage than in the first generation. The first generation power plants design must anticipate radiation damage. Solid sacrificing armour or liquid layers could limit component replacements costs to economic levels. There is more than radiation damage resistance to determine the successful application of structural materials. High endurance against cyclic loading is a prominent requirement, both for magnetic and inertial fusion energy power plants. For high efficiency and compactness of the plant, elevated temperature behaviour should be attractive. Safety and environmental requirements demand that materials have low activation potential and little toxic effects under both normal and accident conditions. The long-term contenders for fusion power plant components near the plasma are materials in the range from innovative steels, such as reduced activation ferritic martensitic steels, to highly advanced ceramic composites based on silicon carbide, and chromium alloys. The steels follow an evolutionary path to basic plant efficiencies. The competition on the energy market in the middle of the next century might necessitate the riskier but more rewarding development of SiCSiC composites or chromium alloys

  8. Future CANDU nuclear power plant design requirements document executive summary

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; S. A. Usmani

    1996-03-01

    The future CANDU Requirements Document (FCRED) describes a clear and complete statement of utility requirements for the next generation of CANDU nuclear power plants including those in Korea. The requirements are based on proven technology of PHWR experience and are intended to be consistent with those specified in the current international requirement documents. Furthermore, these integrated set of design requirements, incorporate utility input to the extent currently available and assure a simple, robust and more forgiving design that enhances the performance and safety. The FCRED addresses the entire plant, including the nuclear steam supply system and the balance of the plant, up to the interface with the utility grid at the distribution side of the circuit breakers which connect the switchyard to the transmission lines. Requirements for processing of low level radioactive waste at the plant site and spent fuel storage requirements are included in the FCRED. Off-site waste disposal is beyond the scope of the FCRED. 2 tabs., 1 fig. (Author) .new

  9. Fukushima, two years later, modification requirements in nuclear power plants

    International Nuclear Information System (INIS)

    Sanchez J, J.; Camargo C, R.; Nunez C, A.; Mendoza F, J. E.; Salmeron V, J. A.

    2013-10-01

    The occurred events in the nuclear power plant of Fukushima Daiichi as consequence of the strong earthquake of 9 grades in the Richter scale and the later tsunami with waves estimated in more than 14 meters high began a series of important questions about the safety of the nuclear power plants in operation and of the new designs. Firstly, have allowed to be questioned on the magnitudes and consequences of the extreme external natural events; that can put in risk the integrity of the safety barriers of a nuclear power plant when being presented in a multiple way. As consequence of the events of the Fukushima Daiichi NPP, the countries with NPPs in operation and /or construction carried out evaluations about their safety operation. They have also realized evaluations about accidents and their impact in the safety, analysis and studies too that have forced to the regulatory bodies to continue a systematic and methodical revision of their procedures and regulations, to identify the possible improvements to the safety in response to the events happened in Japan; everything has taken it to determine the necessity to incorporate additional requirements to the nuclear power plants to mitigate events Beyond the Design Base. Due to Mexico has the nuclear power plant of Laguna Verde, with two units of BWR-5 type with contention Mark III, some the modifications can be applicable to these units to administrate and/or to mitigate the consequences of the possible occurrence of an accident Beyond the Design Base and that could generate a severe accident. In this work an exposition is presented on the modification requirements to confront external natural events Beyond the Design Base, and its application in our country. (Author)

  10. 42 CFR 84.146 - Method of measuring the power and torque required to operate blowers.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Method of measuring the power and torque required... RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.146 Method of measuring the power and torque.... These are used to facilitate timing. To determine the torque or horsepower required to operate the...

  11. Current USAEC seismic requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Mehta, D.S.

    1975-01-01

    The principal seismic and geologic considerations which guide the USAEC in its evaluation of the suitability of proposed sites for nuclear power plants and plant design bases are set forth as design criteria in the AEC regulatory guides. The basic requirements of seismic design and analysis for seismic Category I structures, components, and systems important to public safety have been established in the USAEC regulatory guides and Code of Federal Regulations. It is pointed out that the current state-of-art techniques, best available technology, and additional studies in the field of earthquake engineering can be utilized to resolve seismic concerns. The seismic design requirements for nuclear plants to withstand postulated earthquakes can be standardized and this will be a significant milestone in the continuation of the Nuclear Standardization Program. (author)

  12. Underwater Cycle Ergometry: Power Requirements With and Without Diver Thermal Dress

    National Research Council Canada - National Science Library

    Shykoff, B

    2009-01-01

    .... An ongoing problem has been that, although the power requirement of cycling in the water is known to be greater than that in air for the same ergometer setting, the magnitude of the difference...

  13. Total Quality Education: Profiles of Schools That Demonstrate the Power of Deming's Management Principles.

    Science.gov (United States)

    Schmoker, Michael J.; Wilson, Richard B.

    This book presents profiles of schools that have demonstrated the power of Deming's Total Quality Management (TQM) principles. It describes schools that have successfully applied those strategies for change. The book explores what public education needs most--a compelling but flexible action plan for improvement. Chapter 1 offers a rationale for…

  14. 12 CFR 714.6 - Are you required to retain salvage powers over the leased property?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Are you required to retain salvage powers over the leased property? 714.6 Section 714.6 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS LEASING § 714.6 Are you required to retain salvage powers over the leased...

  15. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  16. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1991-01-01

    This Safety Guide was prepared as part of the Nuclear Safety Standards programme for establishing Codes and Safety Guides relating to nuclear power plants (NPPs). The first edition of the present Safety Guide was developed in the early 1980s. The text has now been brought up-to-date, refined in several details and amended to include non-electrical diverse and independent power sources. This Guide applies to NPP for which the total power supply comprises a normal power supply and an emergency power supply (EPS), which may be electrical or a combination of electrical and non-electrical. The Guide provides general guidance for all types of EPS and specific guidance on the design safety requirements and the features of the electrical and non-electrical portions of the EPS. 9 figs, 2 tabs

  17. Flexibility in Europe's power sector — An additional requirement or an automatic complement?

    International Nuclear Information System (INIS)

    Bertsch, Joachim; Growitsch, Christian; Lorenczik, Stefan; Nagl, Stephan

    2016-01-01

    By 2050, the European Union aims to reduce greenhouse gases by more than 80%. The EU member states have therefore declared to strongly increase the share of renewable energy sources (RES-E) in the next decades. Given a large deployment of wind and solar capacities, there are two major impacts on electricity systems: First, the electricity system must be flexible enough to cope with the volatile RES-E generation, i.e., ramp up supply or ramp down demand on short notice. Second, sufficient back-up capacities are needed during times with low feed-in from wind and solar capacities. This paper analyzes whether there is a need for additional incentive mechanisms for flexibility in electricity markets with a high share of renewables. For this purpose, we simulate the development of the European electricity markets up to the year 2050 using a linear investment and dispatch optimization model. Flexibility requirements are implemented in the model via ramping constraints and provision of balancing power. We found that an increase in fluctuating renewables has a tremendous impact on the volatility of the residual load and consequently on the flexibility requirements. However, any market design that incentivizes investments in least (total system) cost generation investment does not need additional incentives for flexibility. The main trigger for investing in flexible resources is the achievable full load hours and the need for backup capacity. In a competitive market, the cost-efficient technologies that are most likely to be installed, i.e., gas-fired power plants or flexible CCS plants, provide flexibility as a by-product. Under the condition of system adequacy, flexibility never poses a challenge in a cost-minimal capacity mix. Therefore, any market design incentivizing investments in efficient generation thus provides flexibility as an inevi complement. - Highlights: • We analyze flexibility in electricity systems with a high share of renewables. • For scenario

  18. How wing kinematics affect power requirements and aerodynamic force production in a robotic bat wing

    International Nuclear Information System (INIS)

    Bahlman, Joseph W; Swartz, Sharon M; Breuer, Kenneth S

    2014-01-01

    Bats display a wide variety of behaviors that require different amounts of aerodynamic force. To control and modulate aerodynamic force, bats change wing kinematics, which, in turn, may change the power required for wing motion. There are many kinematic mechanisms that bats, and other flapping animals, can use to increase aerodynamic force, e.g. increasing wingbeat frequency or amplitude. However, we do not know if there is a difference in energetic cost between these different kinematic mechanisms. To assess the relationship between mechanical power input and aerodynamic force output across different isolated kinematic parameters, we programmed a robotic bat wing to flap over a range of kinematic parameters and measured aerodynamic force and mechanical power. We systematically varied five kinematic parameters: wingbeat frequency, wingbeat amplitude, stroke plane angle, downstroke ratio, and wing folding. Kinematic values were based on observed values from free flying Cynopterus brachyotis, the species on which the robot was based. We describe how lift, thrust, and power change with increases in each kinematic variable. We compare the power costs associated with generating additional force through the four kinematic mechanisms controlled at the shoulder, and show that all four mechanisms require approximately the same power to generate a given force. This result suggests that no single parameter offers an energetic advantage over the others. Finally, we show that retracting the wing during upstroke reduces power requirements for flapping and increases net lift production, but decreases net thrust production. These results compare well with studies performed on C. brachyotis, offering insight into natural flight kinematics. (paper)

  19. Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.

    Energy Technology Data Exchange (ETDEWEB)

    McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

    2012-02-01

    Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

  20. A new algorithm to determine the total radiated power at ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gloeggler, Stephan; Bernert, Matthias; Eich, Thomas [Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching (Germany); Collaboration: The ASDEX Upgrade Team

    2016-07-01

    Radiation is an essential part of the power balance in a fusion plasma. In future fusion devices about 90% of the power will have to be dissipated, mainly by radiation. For the development of an appropriate operational scenario, information about the absolute level of plasma radiation (P{sub rad,tot}) is crucial. Bolometers are used to measure the radiated power, however, an algorithm is required to derive the absolute power out of many line-integrated measurements. The currently used algorithm (BPD) was developed for the main chamber radiation. It underestimates the divertor radiation as its basic assumptions are not satisfied in this region. Therefore, a new P{sub rad,tot} algorithm is presented. It applies an Abel inversion on the main chamber and uses empirically based assumptions for poloidal asymmetries and the divertor radiation. To benchmark the new algorithm, synthetic emissivity profiles are used. On average, the new Abel inversion based algorithm deviates by only 10% from the nominal synthetic value while BPD is about 25% too low. With both codes time traces of ASDEX Upgrade discharges are calculated. The analysis of these time traces shows that the underestimation of the divertor radiation can have significant consequences on the accuracy of BPD while the new algorithm is shown to be stable.

  1. Day-ahead optimal dispatch for wind integrated power system considering zonal reserve requirements

    International Nuclear Information System (INIS)

    Liu, Fan; Bie, Zhaohong; Liu, Shiyu; Ding, Tao

    2017-01-01

    Highlights: • Analyzing zonal reserve requirements for wind integrated power system. • Modeling day-ahead optimal dispatch solved by chance constrained programming theory. • Determining optimal zonal reserve demand with minimum confidence interval. • Analyzing numerical results on test and large-scale real-life power systems. - Abstract: Large-scale integration of renewable power presents a great challenge for day-ahead dispatch to manage renewable resources while provide available reserve for system security. Considering zonal reserve is an effective way to ensure reserve deliverability when network congested, a random day-ahead dispatch optimization of wind integrated power system for a least operational cost is modeled including zonal reserve requirements and N − 1 security constraints. The random model is transformed into a deterministic one based on the theory of chance constrained programming and a determination method of optimal zonal reserve demand is proposed using the minimum confidence interval. After solving the deterministic model, the stochastic simulation is conducted to verify the validity of solution. Numerical tests and results on the IEEE 39 bus system and a large-scale real-life power system demonstrate the optimal day-ahead dispatch scheme is available and the proposed method is effective for improving reserve deliverability and reducing load shedding after large-capacity power outage.

  2. Development of safety-related regulatory requirements for nuclear power in developing countries. Key issue paper no. 4

    International Nuclear Information System (INIS)

    Han, K.I.

    2000-01-01

    In implementing a national nuclear power program, balanced regulatory requirements are necessary to ensure nuclear safety and cost competitive nuclear power, and to help gain public acceptance. However, this is difficult due to the technology-intensive nature of the nuclear regulatory requirements, the need to reflect evolving technology and the need for cooperation among multidisciplinary technical groups. This paper suggests approaches to development of balanced nuclear regulatory requirements in developing countries related to nuclear power plant safety, radiation protection and radioactive waste management along with key technical regulatory issues. It does not deal with economic or market regulation of electric utilities using nuclear power. It suggests that national regulatory requirements be developed using IAEA safety recommendations as guidelines and safety requirements of the supplier country as a main reference after careful planning, manpower buildup and thorough study of international and supplier country's regulations. Regulation making is not recommended before experienced manpower has been accumulated. With an option that the supplier country's regulations may be used in the interim, the lack of complete national regulatory requirements should not deter introduction of nuclear power in developing countries. (author)

  3. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  4. Power requirements of biogas upgrading by water scrubbing and biomethane compression: Comparative analysis of various plant configurations

    International Nuclear Information System (INIS)

    Budzianowski, Wojciech M.; Wylock, Christophe E.; Marciniak, Przemysław A.

    2017-01-01

    Highlights: • Insights into power requirements of biomethane production from biogas are provided. • Process model is constructed, validated and simulated. • High-pressure and low-pressure plant operation in different configurations is compared. - Abstract: Biogas upgrading by water scrubbing followed by biomethane compression is an environmentally benign process. It may be achieved using various plant configurations characterised by various power requirements with associated effects on biomethane sustainability. Therefore, the current study has been undertaken to systematically investigate the power requirements of a range of water scrubbing options. Two groups of water scrubbing are analysed: (1) high pressure water scrubbing (HPWS) and (2) near-atmospheric pressure water scrubbing (NAPWS). A water scrubbing plant model is constructed, experimentally validated and simulated for seven upgrading plant configurations. Simulation results show that the power requirement of biogas upgrading in HPWS plants is mainly associated with biogas compression. In contrast, in NAPWS plants the main power is required for water pumping. In both plants the compression of the biomethane from atmosphereic pressure to 20 MPa also contributes remarkably. It is observed that the lowest specific power requirement can be obtained for a NAPWS plant without water regeneration (0.24 kW h/Nm"3 raw biogas) but this plant requires cheap water supply, e.g. outlet water from a sewage treatment plant or river. The second is HPWS without flash (0.29 kW h/Nm"3 raw biogas). All other HPWS with flash and NAPWS with water regeneration plants have specific power requirements between 0.30 and 0.33 kW h/Nm"3 raw biogas. Biogas compression without upgrading requires about 0.29 kW h/Nm"3 raw biogas. The thermodynamic efficiency of biogas upgrading is between 2.2% and 9.8% depending on the plant configuration while biomethane compression efficiency is higher, about 55%. This result implies that the

  5. The state of the art in Japan's telecommunications energy systems - Strategy for Total Power Management -

    Energy Technology Data Exchange (ETDEWEB)

    Muroyama, Seiichi [NTT Power and Building Facilities Inc., Midori-cho, Musashino-shi, Tokyo (Japan)

    2000-07-01

    The ''strategy for total power management (STPM)'' was developed for managing problems in relation to energy for multimedia services in a comprehensive manner from the viewpoints of risk, cost, and environment. To provide integrated services based on STPM, a DC power supply system, a highly reliable UPS, and a co-generation system have been developed. (orig.)

  6. New developments in RF power sources

    International Nuclear Information System (INIS)

    Miller, R.H.

    1994-06-01

    The most challenging rf source requirements for high-energy accelerators presently being studied or designed come from the various electron-positron linear collider studies. All of these studies except TESLA (the superconducting entry in the field) have specified rf sources with much higher peak powers than any existing tubes at comparable high frequencies. While circular machines do not, in general, require high peak power, the very high luminosity electron-positron rings presently being designed as B factories require prodigious total average rf power. In this age of energy conservation, this puts a high priority on high efficiency for the rf sources. Both modulating anodes and depressed collectors are being investigated in the quest for high efficiency at varying output powers

  7. An analysis of cross-sectional variations in total household energy requirements in India using micro survey data

    International Nuclear Information System (INIS)

    Pachauri, Shonali

    2004-01-01

    Using micro level household survey data from India, we analyse the variation in the pattern and quantum of household energy requirements, both direct and indirect, and the factors causing such variation. An econometric analysis using household survey data from India for the year 1993-1994 reveals that household socio-economic, demographic, geographic, family and dwelling attributes influence the total household energy requirements. There are also large variations in the pattern of energy requirements across households belonging to different expenditure classes. Results from the econometric estimation show that total household expenditure or income level is the most important explanatory variable causing variation in energy requirements across households. In addition, the size of the household dwelling and the age of the head of the household are related to higher household energy requirements. In contrast, the number of members in the household and literacy of the head are associated with lower household energy requirements

  8. An analysis of cross-sectional variations in total household energy requirements in India using micro survey data

    Energy Technology Data Exchange (ETDEWEB)

    Pachauri, Shonali E-mail: shonali.pachauri@cepe.mavt.ethz.ch

    2004-10-01

    Using micro level household survey data from India, we analyse the variation in the pattern and quantum of household energy requirements, both direct and indirect, and the factors causing such variation. An econometric analysis using household survey data from India for the year 1993-1994 reveals that household socio-economic, demographic, geographic, family and dwelling attributes influence the total household energy requirements. There are also large variations in the pattern of energy requirements across households belonging to different expenditure classes. Results from the econometric estimation show that total household expenditure or income level is the most important explanatory variable causing variation in energy requirements across households. In addition, the size of the household dwelling and the age of the head of the household are related to higher household energy requirements. In contrast, the number of members in the household and literacy of the head are associated with lower household energy requirements.

  9. 10 CFR 503.8 - No alternate power supply-general requirement for certain exemptions for new powerplants.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false No alternate power supply-general requirement for certain exemptions for new powerplants. 503.8 Section 503.8 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES General Requirements for Exemptions § 503.8 No alternate power supply—general...

  10. Accuracy requirements on operational measurements in nuclear power plants with regard to balance methodology

    International Nuclear Information System (INIS)

    Holecek, C.

    1986-01-01

    Accurate in-service measurement is necessary for power balancing of nuclear power plants, i.e., the determination of fuel consumption, electric power generation, heat delivery and the degree of fuel power utilization. The only possible method of determining the input of total consumed energy from the fuel is the balance of the primary coolant circuit. This is because for the purposes of power balancing it is not possible to measure the amount of power generated from nuclear fuel. Relations are presented for the calculation of basic indices of the power balance. It is stated that for the purposes of power balancing and analyses the precision of measuring instrument at the input and output of balancing circuits is of primary importance, followed by the precision of measuring instruments inside balancing circuits and meters of auxiliary parameters. (Z.M.). 7 refs., 1 tab

  11. Accelerating an Ordered-Subset Low-Dose X-Ray Cone Beam Computed Tomography Image Reconstruction with a Power Factor and Total Variation Minimization.

    Science.gov (United States)

    Huang, Hsuan-Ming; Hsiao, Ing-Tsung

    2016-01-01

    In recent years, there has been increased interest in low-dose X-ray cone beam computed tomography (CBCT) in many fields, including dentistry, guided radiotherapy and small animal imaging. Despite reducing the radiation dose, low-dose CBCT has not gained widespread acceptance in routine clinical practice. In addition to performing more evaluation studies, developing a fast and high-quality reconstruction algorithm is required. In this work, we propose an iterative reconstruction method that accelerates ordered-subsets (OS) reconstruction using a power factor. Furthermore, we combine it with the total-variation (TV) minimization method. Both simulation and phantom studies were conducted to evaluate the performance of the proposed method. Results show that the proposed method can accelerate conventional OS methods, greatly increase the convergence speed in early iterations. Moreover, applying the TV minimization to the power acceleration scheme can further improve the image quality while preserving the fast convergence rate.

  12. Analysis of the Possibility of Required Resources Estimation for Nuclear Power Plant Decommissioning Applying BIM

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu [Korea Institute of construction Technology, Goyang (Korea, Republic of); Kim, Woojung [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Estimation of decommissioning cost, decommissioning strategy, and decommissioning quantity at the time when entering into any decommissioning plans are some elements whose inputs are mandatory for nuclear power plant decommissioning. Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. This study aims at analyzing whether required resources for decommissioning nuclear power plants can be estimated, applying BIM. To achieve this goal, this study analyzed the status quo of BIM such as definition, characteristics, and areas applied, and made use of them when drawing out study results by examining types and features of the tools realizing BIM. In order to review how BIM could be used for decommissioning nuclear power plants, the definition, characteristics and applied areas of BIM were discussed. BIM designs objects of the structures (walls, slabs, pillars, stairs, windows and doors, etc.) by 3D technology and endows attribute (function, structure and usage) information for each object, thereby providing visualized information of structures for participants in construction projects. Major characteristics of BIM attribute information are as follows: - Geometry: The information of objects is represented by measurable geometric information - Extensible object attributes: Objects include pre-defined attributes, and allow extension of other attributes. Any model that includes these attributes forms relationships with other various attributes in order to perform analysis and simulation. - All information including the attributes are integrated to ensure continuity, accuracy and accessibility, and all information used during the life cycle of structures are supported. This means that when information of required resources is added as another attributes other than geometric

  13. Integrated approach for power quality requirements at the point of connection

    NARCIS (Netherlands)

    Cobben, J.F.G.; Bhattacharyya, S.; Myrzik, J.M.A.; Kling, W.L.

    2007-01-01

    Given the nature of electricity, every party connected to the power system influences voltage quality, which means that every party also should meet requirements. In this field, a sound coordination among technical standards (system-related, installation-related and product-related) is of paramount

  14. Quality assurance requirements for the operation of Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1983-09-01

    An adaption of NRC's 10 CFR 50, Appendis B (Quality Assurance Criteria for Nuclear Power and Fuel Reprocessing Plants) to Swedish conditions is presented. No references are given to regulations standards etc that influence the requirements and their adaption to local conditions. (Aa)

  15. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition); Bezopasnost' atomnykh ehlektrostantsij: proektirovanie. Konkretnye trebovaniya bezopasnosti

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  16. General requirements for concrete containment structures for CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1993-07-01

    This standard provides the general requirements used in the design, construction, testing, and commissioning of concrete containment structures for CANDU nuclear power plants designated as class containment and is directed to the owners, designers, manufacturers, fabricators, and constructors of the concrete components and parts

  17. Comparison of isokinetic peak force and power in adults with partial and total blindness.

    Science.gov (United States)

    Horvat, Michael; Ray, Christopher; Nocera, Joe; Croce, Ron

    2006-08-01

    For many populations the ability to move efficiently is compromised by an impaired muscular functioning. Strength development is necessary to overcome the effects of gravity to maintain posture and generate movement responses for mobility. The strength and power capabilities of individuals with total blindness (n = 12) were compared to those with partial vision (n = 12) to evaluate effects of vision on performance. Results indicate that (1) no significant differences were apparent between total blindness and partial vision, (2) significant sex differences were evident in each group, and (3) better performance was apparent at lower velocities. It was concluded that physical performance in individuals with blindness and partial vision are equally deficient.

  18. Precipitation and total power consumption in the ionosphere: Global MHD simulation results compared with Polar and SNOE observations

    Directory of Open Access Journals (Sweden)

    M. Palmroth

    2006-05-01

    Full Text Available We compare the ionospheric electron precipitation morphology and power from a global MHD simulation (GUMICS-4 with direct measurements of auroral energy flux during a pair of substorms on 28-29 March 1998. The electron precipitation power is computed directly from global images of auroral light observed by the Polar satellite ultraviolet imager (UVI. Independent of the Polar UVI measurements, the electron precipitation energy is determined from SNOE satellite observations on the thermospheric nitric oxide (NO density. We find that the GUMICS-4 simulation reproduces the spatial variation of the global aurora rather reliably in the sense that the onset of the substorm is shown in GUMICS-4 simulation as enhanced precipitation in the right location at the right time. The total integrated precipitation power in the GUMICS-4 simulation is in quantitative agreement with the observations during quiet times, i.e., before the two substorm intensifications. We find that during active times the GUMICS-4 integrated precipitation is a factor of 5 lower than the observations indicate. However, we also find factor of 2-3 differences in the precipitation power among the three different UVI processing methods tested here. The findings of this paper are used to complete an earlier objective, in which the total ionospheric power deposition in the simulation is forecasted from a mathematical expression, which is a function of solar wind density, velocity and magnetic field. We find that during this event, the correlation coefficient between the outcome of the forecasting expression and the simulation results is 0.83. During the event, the simulation result on the total ionospheric power deposition agrees with observations (correlation coefficient 0.8 and the AE index (0.85.

  19. Analysis of power and frequency control requirements in view of increased decentralized production and market liberalization

    International Nuclear Information System (INIS)

    Roffel, B.; Boer, W.W. de

    2003-01-01

    This paper presents a systematic approach of the analysis of the minimum control requirements that are imposed on power producing units in the Netherlands, especially in the case when decentralized production increases. Also some effects of the liberalization on the control behavior are analyzed. First an overview is given of the amount and type of power production in the Netherlands, followed by a review of the control requirements. Next models are described, including a simplified model for the UCTE power system. The model was tested against frequency and power measurements after failure of a 558 MW production unit in the Netherlands. Agreement between measurements and model predictions proved to be good. The model was subsequently used to analyze the primary and secondary control requirements and the impact of an increase in decentralized power production on the fault restoration capabilities of the power system. Since the latter production units are not actively participating in primary and secondary control, fault restoration takes longer and becomes unacceptable when only 35% of the power producing units participate in secondary control. Finally, the model was used to study the impact of deregulation, especially the effect of 'block scheduling', on additional control actions of the secondary control. (Author)

  20. 78 FR 69543 - Record Requirements in the Mechanical Power Presses Standard

    Science.gov (United States)

    2013-11-20

    ... program). In such cases, OSHA would treat the weekly inspection as part of the periodic inspection.... OSHA-2013-0010] RIN 1218-AC80 Record Requirements in the Mechanical Power Presses Standard AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Direct final rule; request for comments...

  1. 78 FR 69606 - Record Requirements in the Mechanical Power Presses Standard

    Science.gov (United States)

    2013-11-20

    ... the inspection program). In such cases, OSHA would treat the weekly inspection as part of the periodic.... OSHA-2013-0010] RIN 1218-AC80 Record Requirements in the Mechanical Power Presses Standard AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Proposed rule; request for comments...

  2. Flood control design requirements and flood evaluation methods of inland nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Ailing; Wang Ping; Zhu Jingxing

    2011-01-01

    Effect of flooding is one of the key safety factors and environmental factors in inland nuclear power plant sitting. Up to now, the rule of law and standard systems are established for the selection of nuclear power plant location and flood control requirements in China. In this paper flood control standards of China and other countries are introduced. Several inland nuclear power plants are taken as examples to thoroughly discuss the related flood evaluation methods. The suggestions are also put forward in the paper. (authors)

  3. EPPRD: An Efficient Privacy-Preserving Power Requirement and Distribution Aggregation Scheme for a Smart Grid.

    Science.gov (United States)

    Zhang, Lei; Zhang, Jing

    2017-08-07

    A Smart Grid (SG) facilitates bidirectional demand-response communication between individual users and power providers with high computation and communication performance but also brings about the risk of leaking users' private information. Therefore, improving the individual power requirement and distribution efficiency to ensure communication reliability while preserving user privacy is a new challenge for SG. Based on this issue, we propose an efficient and privacy-preserving power requirement and distribution aggregation scheme (EPPRD) based on a hierarchical communication architecture. In the proposed scheme, an efficient encryption and authentication mechanism is proposed for better fit to each individual demand-response situation. Through extensive analysis and experiment, we demonstrate how the EPPRD resists various security threats and preserves user privacy while satisfying the individual requirement in a semi-honest model; it involves less communication overhead and computation time than the existing competing schemes.

  4. New requirements on safety of nuclear power plants according to the IAEA safety standards

    International Nuclear Information System (INIS)

    Misak, J.

    2005-01-01

    In this presentation author presents new requirements on safety of nuclear power plants according to the IAEA safety standards. It is concluded that: - New set of IAEA Safety Standards is close to completion: around 40 standards for NPPs; - Different interpretation of IAEA Safety Standards at present: best world practices instead of previous 'minimum common denominator'; - A number of safety improvements required for NPPs; - Requirements related to BDBAs and severe accidents are the most demanding due to degradation of barriers: hardware modifications and accident management; - Large variety between countries in implementation of accident management programmes: from minimum to major hardware modifications; -Distinction between existing and new NPPs is essential from the point of view of the requirements; WWER 440 reactors have potential to reflect IAEA Safety Standards for existing NPPs; relatively low reactor power offers broader possibilities

  5. Prediction of requirements on labor force in the fuel and power generation sector

    International Nuclear Information System (INIS)

    Kaveckova, R.

    1990-01-01

    One of the aspects of socio-economic assessment of development is quantification of the expected requirements on the number of personnel. Predictions are discussed for the period before the year 2005 for solid fuel mining and treatment, gas production and bitumen mining, power and heat generation and also for the production of electricity and heat by nuclear power plants. They are based on an analysis of past development and the present state, on presumed implementation of various concept variants, on the type structure of nuclear power plants, on the rules of the electric power supply system, and also on foreign materials. It is expected that in 2005, nuclear power will employ 15,654 personnel. (M.D.). 4 tabs., 16 refs

  6. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  7. Research on Simulation Requirements and Business Architecture of Automated Demand Response in Power Sales Side Market Liberalization

    Science.gov (United States)

    Liu, Yiqun; Zhou, Pengcheng; Zeng, Ming; Chen, Songsong

    2018-01-01

    With the gradual reform of the electricity market, the power sale side liberalization has become the focus of attention as the key task of reform. The open power market provides a good environment for DR (Demand Response). It is of great significance to research the simulation requirements and business architecture of ADR (Automatic Demand Response) in power sale side market liberalization. Firstly, this paper analyzes the simulation requirements of ADR. Secondly, it analyzes the influence factors that the business development of ADR from five aspects after power sale side market liberalization. Finally, Based on ADR technology support system, the business architecture of ADR after power sale side market liberalization is constructed.

  8. Total quality management and nursing: a shared vision.

    Science.gov (United States)

    Morey, W

    1996-09-01

    The application of the Total Quality Management (TQM) philosophy within the health care sector would enhance the development of nursing power, leadership and knowledge. TQM challenges conventional management techniques as it requires a participative management style in order to be effective. There are many potential benefits for nurses, when quality assurance monitoring within a hierarchical management structure, is replaced with a focus on continuous quality improvement by every member of staff. These benefits are described within the context of both organisational and personal commitment to Total Quality Management.

  9. Analysis of Valve Requirements for High-Efficiency Digital Displacement Fluid Power Motors

    DEFF Research Database (Denmark)

    Rømer, Daniel; Johansen, Per; Pedersen, Henrik C.

    2013-01-01

    Digital displacement fluid power motors have been shown to enable high-efficiency operation in a wide operation range, including the part load range where conventional fluid power motors suffers from poor efficiencies. The use of these digital displacement motors set new requirements for the valve...... transition time and flow-pressure coefficient are normalized, leading to a presentation of the general efficiency map of the digital displacement motor. Finally the performance of existing commercial valves with respect to digital motors is commented....

  10. Analysis of Balancing Requirements in Future Sustainable and Reliable Power Systems

    International Nuclear Information System (INIS)

    Frunt, J.

    2011-01-01

    This thesis elaborates on the rules for power balancing, provides a method for quantifying balancing requirements and examines the effect of future changes on balancing. Chapter 2 elaborates on system balancing and the different actors and entities in the electricity delivery system. The necessity and implementation of power balancing are explained. Also different subsequent markets (i.e., day-ahead markets, intraday markets and imbalance settlement systems) and options to trade electricity are discussed. As the research focusses mainly on the Netherlands, properties of the Dutch imbalance settlement system are analyzed. Based on this framework an in-depth analysis of imbalances and calls for balancing capacity with the corresponding prices is given. This shows the incentives to minimize the amount of imbalance in the system and to participate in the imbalance settlement system. Chapter 3 elaborates on the level of aggregation that the entities, involved in the imbalance settlement system, in electricity markets can have. Based on current market rules, incentives to either grow or shrink and by aggregating more or less entities are discussed. The level of aggregation will directly influence the functioning of the imbalance settlement system. It is shown that larger aggregations benefit more from the canceling out of imbalances. The imbalances of the Netherlands and Belgium have been aggregated to illustrate the possible benefits of aggregating multiple national imbalance settlement systems. The increased penetration of renewable generation strongly influences the planning and operation of the power system. As many renewable energy generators have a fluctuating power output, several methods are discussed in chapter 4 that can be used to classify and quantify the balancing requirements to counteract these fluctuations. Chapter 4 discusses the multiple existing classes of balancing capacity and the corresponding methods to quantify their needs. Due to the

  11. Analysis of Balancing Requirements in Future Sustainable and Reliable Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Frunt, J.

    2011-06-01

    This thesis elaborates on the rules for power balancing, provides a method for quantifying balancing requirements and examines the effect of future changes on balancing. Chapter 2 elaborates on system balancing and the different actors and entities in the electricity delivery system. The necessity and implementation of power balancing are explained. Also different subsequent markets (i.e., day-ahead markets, intraday markets and imbalance settlement systems) and options to trade electricity are discussed. As the research focusses mainly on the Netherlands, properties of the Dutch imbalance settlement system are analyzed. Based on this framework an in-depth analysis of imbalances and calls for balancing capacity with the corresponding prices is given. This shows the incentives to minimize the amount of imbalance in the system and to participate in the imbalance settlement system. Chapter 3 elaborates on the level of aggregation that the entities, involved in the imbalance settlement system, in electricity markets can have. Based on current market rules, incentives to either grow or shrink and by aggregating more or less entities are discussed. The level of aggregation will directly influence the functioning of the imbalance settlement system. It is shown that larger aggregations benefit more from the canceling out of imbalances. The imbalances of the Netherlands and Belgium have been aggregated to illustrate the possible benefits of aggregating multiple national imbalance settlement systems. The increased penetration of renewable generation strongly influences the planning and operation of the power system. As many renewable energy generators have a fluctuating power output, several methods are discussed in chapter 4 that can be used to classify and quantify the balancing requirements to counteract these fluctuations. Chapter 4 discusses the multiple existing classes of balancing capacity and the corresponding methods to quantify their needs. Due to the

  12. Total gamma activity measurements for determining the radioactivity of residual materials from nuclear power stations

    International Nuclear Information System (INIS)

    Auler, I.; Meyer, M.; Stickelmann, J.

    1995-01-01

    Large amounts of residual materials from retrofitting measures and from decommissioning of nuclear power stations shows such a weak level of radioactivity that they could be released after decision measurements. Expenses incurred with complex geometry cannot be taken with common methods. NIS developed a Release Measurement Facility (RMF) based on total gamma activity measurements especially for these kind of residual materials. The RMF has been applied for decision measurements in different nuclear power plants. Altogether about 2,000 Mg of various types of materials have been measured up to now. More than 90 % of these materials could be released 0 without any restriction after decision measurements

  13. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  14. Multimegawatt nuclear systems for space power

    International Nuclear Information System (INIS)

    Dearien, J.A.; Whitbeck, J.F.

    1987-01-01

    The conceptual design and performance capability requirements of multi-MW nuclear powerplants for SDI systems are considered. The candidate powerplant configurations encompass Rankine, Brayton, and thermionic cycles; these respectively provide the lightest to heaviest system masses, since reactor and shield masses represent only 10-30 percent of total closed power system weight for the Rankine and Brayton systems. Many of the gas reactor concepts entertained may be operated in dual mode, thereby furnishing both long term low power and high power for short periods. Heat rejection is identified as the most important technology, since about 50 percent of the total closed mass is constituted by the heat rejection system. 9 references

  15. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  16. Manpower and training requirements for operation and maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Shah, J.C.

    1975-01-01

    The experience in India with regard to the staffing of nuclear power station operations and maintenance is encouraging in the sense that given the effort and time, developing countries should not find it unduly difficult to meet their requirements. (orig.) [de

  17. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  18. Requirements for auditing of quality assurance programs for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Requirements and guidance are provided for establishing and implementing a system of internal and external audits of quality assurance programs for nuclear power plants, including the preparation, performance, reporting and follow-up of audits by both the auditing and the audited organizations. This standard is to be used in conjunction with ANSI N45.2

  19. Discussion on several important safety requirements for the new nuclear power plant

    International Nuclear Information System (INIS)

    Yan Tianwen; Li Jigen; Zhang Lin; Feng Youcai; Jia Xiang; Li Wenhong

    2013-01-01

    Post the Fukushima nuclear accident, the Chinese government raised higher safety goals and safety requirements for the new nuclear power plant to be constructed. The paper expounded the important indicators of safety requirements and the aspects of safety modification that had been developed for the new NPPs. It also discussed and analyzed the main fields required by the new NPPs safety requirements in the safety goals, safety evaluation of sites, defenses of internal and external events, severe accident prevention and mitigation, design of reactor core, containment system and I and C system, and optimization of engineering measure, which gave some references to the design, construction and safety modifications of new NPPs in China. (authors)

  20. Driver electronics design and control for a total artificial heart linear motor.

    Science.gov (United States)

    Unthan, Kristin; Cuenca-Navalon, Elena; Pelletier, Benedikt; Finocchiaro, Thomas; Steinseifer, Ulrich

    2018-01-27

    For any implantable device size and efficiency are critical properties. Thus, a linear motor for a Total Artificial Heart was optimized with focus on driver electronics and control strategies. Hardware requirements were defined from power supply and motor setup. Four full bridges were chosen for the power electronics. Shunt resistors were set up for current measurement. Unipolar and bipolar switching for power electronics control were compared regarding current ripple and power losses. Here, unipolar switching showed smaller current ripple and required less power to create the necessary motor forces. Based on calculations for minimal power losses Lorentz force was distributed to the actor's four coils. The distribution was determined as ratio of effective magnetic flux through each coil, which was captured by a force test rig. Static and dynamic measurements under physiological conditions analyzed interaction of control and hardware and all efficiencies were over 89%. In conclusion, the designed electronics, optimized control strategy and applied current distribution create the required motor force and perform optimal under physiological conditions. The developed driver electronics and control offer optimized size and efficiency for any implantable or portable device with multiple independent motor coils. Graphical Abstract ᅟ.

  1. Minimization of power consumption during charging of superconducting accelerating cavities

    Energy Technology Data Exchange (ETDEWEB)

    Bhattacharyya, Anirban Krishna, E-mail: anirban.bhattacharyya@physics.uu.se; Ziemann, Volker; Ruber, Roger; Goryashko, Vitaliy

    2015-11-21

    The radio frequency cavities, used to accelerate charged particle beams, need to be charged to their nominal voltage after which the beam can be injected into them. The standard procedure for such cavity filling is to use a step charging profile. However, during initial stages of such a filling process a substantial amount of the total energy is wasted in reflection for superconducting cavities because of their extremely narrow bandwidth. The paper presents a novel strategy to charge cavities, which reduces total energy reflection. We use variational calculus to obtain analytical expression for the optimal charging profile. Energies, reflected and required, and generator peak power are also compared between the charging schemes and practical aspects (saturation, efficiency and gain characteristics) of power sources (tetrodes, IOTs and solid state power amplifiers) are also considered and analysed. The paper presents a methodology to successfully identify the optimal charging scheme for different power sources to minimize total energy requirement.

  2. Minimization of power consumption during charging of superconducting accelerating cavities

    International Nuclear Information System (INIS)

    Bhattacharyya, Anirban Krishna; Ziemann, Volker; Ruber, Roger; Goryashko, Vitaliy

    2015-01-01

    The radio frequency cavities, used to accelerate charged particle beams, need to be charged to their nominal voltage after which the beam can be injected into them. The standard procedure for such cavity filling is to use a step charging profile. However, during initial stages of such a filling process a substantial amount of the total energy is wasted in reflection for superconducting cavities because of their extremely narrow bandwidth. The paper presents a novel strategy to charge cavities, which reduces total energy reflection. We use variational calculus to obtain analytical expression for the optimal charging profile. Energies, reflected and required, and generator peak power are also compared between the charging schemes and practical aspects (saturation, efficiency and gain characteristics) of power sources (tetrodes, IOTs and solid state power amplifiers) are also considered and analysed. The paper presents a methodology to successfully identify the optimal charging scheme for different power sources to minimize total energy requirement.

  3. Minimum power requirement for environmental control of aircraft

    International Nuclear Information System (INIS)

    Ordonez, Juan Carlos; Bejan, Adrian

    2003-01-01

    This paper addresses two basic issues in the thermodynamic optimization of environmental control systems (ECS) for aircraft: realistic limits for the minimal power requirement, and design features that facilitate operation at minimal power consumption. Four models are proposed and optimized. In the first, the ECS operates reversibly, the air stream in the cabin is mixed to one temperature, and the cabin experiences heat transfer with the ambient, across its insulation. The cabin temperature is fixed. In the second model, the fixed cabin temperature is assigned to the internal solid surfaces of the cabin, and a thermal resistance separates these surfaces from the air mixed in the cabin. In the third model, the ECS operates irreversibly, based on the bootstrap air cycle. The fourth model combines the ECS features of the third model with the cabin-environment interaction features of the second model. It is shown that in all models the temperature of the air stream that the ECS delivers to the cabin can be optimized for operation at minimal power. The effect of other design parameters and flying conditions is documented. The optimized air delivery temperature is relatively insensitive to the complexity of the model; for example, it is insensitive to the size of the heat exchanger used in the bootstrap air cycle. This study adds to the view that robustness is a characteristic of optimized complex flow systems, and that thermodynamic optimization results can be used for orientation in the pursuit of more complex and realistic designs

  4. Distributed Flexibility Management Targeting Energy Cost and Total Power Limitations in Electricity Distribution Grids

    DEFF Research Database (Denmark)

    Bessler, Sanford; Kemal, Mohammed Seifu; Silva, Nuno

    2018-01-01

    Demand Management uses the interaction and information exchange between multiple control functions in order to achieve goals that can vary in different application contexts. Since there are several stakeholders involved, these may have diverse objectives and even use different architectures...... to actively manage power demand. This paper utilizes an existing distributed demand management architecture in order to provide the following contributions: (1) It develops and evaluates a set of algorithms that combine the optimization of energy costs in scenarios of variable day-ahead prices with the goal...... to improve distribution grid operation reliability, here implemented by a total Power limit. (2) It evaluates the proposed scheme as a distributed system where flexibility information is exchanged with the existing industry standard OpenADR. A Hardware-in-the-Loop testbed realization demonstrates...

  5. Power gating of VLSI circuits using MEMS switches in low power applications

    KAUST Repository

    Shobak, Hosam

    2011-12-01

    Power dissipation poses a great challenge for VLSI designers. With the intense down-scaling of technology, the total power consumption of the chip is made up primarily of leakage power dissipation. This paper proposes combining a custom-designed MEMS switch to power gate VLSI circuits, such that leakage power is efficiently reduced while accounting for performance and reliability. The designed MEMS switch is characterized by an 0.1876 ? ON resistance and requires 4.5 V to switch. As a result of implementing this novel power gating technique, a standby leakage power reduction of 99% and energy savings of 33.3% are achieved. Finally the possible effects of surge currents and ground bounce noise are studied. These findings allow longer operation times for battery-operated systems characterized by long standby periods. © 2011 IEEE.

  6. Uranium requirements for advanced fuel cycles in expanding nuclear power systems

    International Nuclear Information System (INIS)

    Banerjee, S.; Tamm, H.

    1978-01-01

    When considering advanced fuel cycle strategies in rapidly expanding nuclear power systems, equilibrium analyses do not apply. A computer simulation that accounts for system delay times and fissile inventories has been used to study the effects of different fuel cycles and different power growth rates on uranium consumption. The results show that for a given expansion rate of installed capacity, the main factors that affect resource requirements are the fissile inventory needed to introduce the advanced fuel cycle and the conversion (or breeding) ratio. In rapidly expanding systems, the effect of fissile inventory dominates, whereas in slowly expanding systems, conversion or breeding ratio dominates. Heavy-water-moderated and -cooled reactors, with their high conversion ratios, appear to be adaptable vehicles for accommodating fuel cycles covering a wide range of initial fissile inventories. They are therefore particularly suitable for conserving uranium over a wide range of nuclear power system expansion rates

  7. General requirements for pressure-retaining systems and components in CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1991-11-01

    This standard specifies the general requirements for the design, fabrication and installation of pressure-retaining systems, components, and their supports in CANDU nuclear power plants. (16 figs., 2 tabs., 25 refs.)

  8. CRISP. Requirements Specifications of Intelligent ICT Simulation Tools for Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    Warmer, C.J.; Kester, J.C.P.; Kamphuis, I.G. [ECN Energy in the Built Environment and Networks, Petten (Netherlands); Carlsson, P [EnerSearch, Malmoe (Sweden); Fontela, M. [Laboratory of Electrical Engineering LEG, Grenoble (France); Gustavsson, R. [Blekinge Institute of Technology BTH, Karlskrona (Sweden)

    2003-10-15

    This report, deliverable D2.1 in the CRISP project, serves as a preparation report for the development of simulation tools and prototype software which will be developed in forthcoming stages of the CRISP project. Application areas for these simulations are: fault detection and diagnosis, supply and demand matching and intelligent load shedding. The context in which these applications function is the power network with a high degree of distributed generation, including renewables. In order to control a so called distributed grid we can benefit from a high level of distributed control and intelligence. This requires, on top of the power system network, an information and communication network.. We argue that such a network should be seen as an enabler of distributed control and intelligence. The applications, through which control and intelligence is implemented, then form a third network layer, the service oriented network. Building upon this three-layered network model we derive in this report the requirements for a simulation tool and experiments which study new techniques for fault detection and diagnostics and for simulation tools and experiments implementing intelligent load shedding and supply and demand matching scenarios. We also look at future implementation of these services within the three-layered network model and the requirements that follow for the core information and communication network and for the service oriented network. These requirements, supported by the studies performed in the CRISP Workpackage 1, serve as a basis for development of the simulation tools in the tasks 2.2 to 2.4.

  9. CRISP. Requirements Specifications of Intelligent ICT Simulation Tools for Power Applications

    International Nuclear Information System (INIS)

    Warmer, C.J.; Kester, J.C.P.; Kamphuis, I.G.; Carlsson, P; Fontela, M.; Gustavsson, R.

    2003-10-01

    This report, deliverable D2.1 in the CRISP project, serves as a preparation report for the development of simulation tools and prototype software which will be developed in forthcoming stages of the CRISP project. Application areas for these simulations are: fault detection and diagnosis, supply and demand matching and intelligent load shedding. The context in which these applications function is the power network with a high degree of distributed generation, including renewables. In order to control a so called distributed grid we can benefit from a high level of distributed control and intelligence. This requires, on top of the power system network, an information and communication network.. We argue that such a network should be seen as an enabler of distributed control and intelligence. The applications, through which control and intelligence is implemented, then form a third network layer, the service oriented network. Building upon this three-layered network model we derive in this report the requirements for a simulation tool and experiments which study new techniques for fault detection and diagnostics and for simulation tools and experiments implementing intelligent load shedding and supply and demand matching scenarios. We also look at future implementation of these services within the three-layered network model and the requirements that follow for the core information and communication network and for the service oriented network. These requirements, supported by the studies performed in the CRISP Workpackage 1, serve as a basis for development of the simulation tools in the tasks 2.2 to 2.4

  10. A Use Case Methodology to Handle Conflicting Controller Requirements for Future Power Systems

    DEFF Research Database (Denmark)

    Heussen, Kai; Uslar, Mathias; Tornelli, Carlo

    2015-01-01

    This paper proposes a standards based requirements elicitation and analysis strategy tailored for smart grid control structure development. Control structures in electric power systems often span across several systems and stakeholders. Requirements elicitation for such control systems therefore...... requires coordination across many stakeholders and it is challenging to achieve a consistent design. To enable an iterative and distributed development we suggest a conflict management approach as a modular element of the design strategy, focusing on conflict identification and tracing. The idea...

  11. Considerations on the need for electricity storage requirements: Power versus energy

    International Nuclear Information System (INIS)

    Belderbos, Andreas; Virag, Ana; D’haeseleer, William; Delarue, Erik

    2017-01-01

    Highlights: • General storage principles are analyzed. • Storage units have different limitations (power versus energy). • Storage power and energy are required, dependent on residual profile. • Relationship between residual profile and optimal storage portfolio is derived. • Broadly applicable rules regarding optimal storage investments are presented. - Abstract: Different storage technologies enable an increasing share of variable renewable generation in the electricity system by reducing the temporal mismatch between generation and demand. Two storage ratings are essential to time-shift delivery of electricity to loads: electric power, or instantaneous electricity flow [W], and electric energy, or power integrated over time [Wh]. An optimal storage portfolio is likely composed of multiple technologies, each having specific power and energy ratings. This paper derives and explains the link between the shape of the time-varying demand and generation profiles and the amount of desirably installed storage capacity, both energy and power. An analysis is performed for individual storage technologies first, showing a link between the necessary power and energy capacity and the demand and generation profile. Then combinations of storage technologies are analyzed to reveal their mutual interaction in a storage portfolio. Results show an increase in desirability for storage technologies with low cost power ratings when the mismatch between generation and demand occurs in daily to weekly cycles. Storage technologies with low cost energy ratings are preferred when this mismatch occurs in monthly to seasonal cycles. The findings of this work can help energy system planners and policy makers to explain results from generation expansion planning studies and to isolate the storage benefits accountable to temporal arbitrage in broader electricity storage studies.

  12. The BPX electrical power system

    International Nuclear Information System (INIS)

    Huttar, D.; Bronnev, G.; Fromm, N.

    1992-01-01

    This paper reports on the Burning Plasma Experiment (BPX) which when operating at a toroidal field of 8.1 tesla and a plasma current of 10.6 megamps, requires peak power of 1235 megawatts and total pulse energy of over 21 gigajoules. These requirements are twice and over four times the corresponding figures for the Tokamak Fusion Test Reactor (TFTR), respectively. The design of the BPX power system has evolved, along with the tokamak, over a period of several years and has included studies of several alternative approaches. The reapplication of the existing TFTR power and energy facilities has been basic to all approaches. Among the new sources of pulse power and energy that have been considered are: direct utility grid pulsing, new flywheel units, and lead-acid storage batteries. The toroidal field power requirements are the greatest of the BPX subsystems and, fortunately, are sufficiently free of dynamics to allow the consideration of all approaches. Additional design challenges were presented by the multiplicity of plasma control scenarios incorporated in the BPX physics planning and the power response demanded of the plasma position control system

  13. Lithuanian requirements for ageing management of systems and components important to safety of nuclear power plant

    International Nuclear Information System (INIS)

    Ramanauskiene, A.

    2000-01-01

    In this paper the Lithuanian requirements for ageing management of systems and components important to safety of Ignalina nuclear power plant (two RBMK-1500 water-cooled graphite moderated channel-type power reactors) are presented

  14. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  15. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  16. Mars power system concept definition study. Volume 1: Study results

    Science.gov (United States)

    Littman, Franklin D.

    1994-01-01

    A preliminary top level study was completed to define power system concepts applicable to Mars surface applications. This effort included definition of power system requirements and selection of power systems with the potential for high commonality. These power systems included dynamic isotope, Proton Exchange Membrane (PEM) regenerative fuel cell, sodium sulfur battery, photovoltaic, and reactor concepts. Design influencing factors were identified. Characterization studies were then done for each concept to determine system performance, size/volume, and mass. Operations studies were done to determine emplacement/deployment maintenance/servicing, and startup/shutdown requirements. Technology development roadmaps were written for each candidate power system (included in Volume 2). Example power system architectures were defined and compared on a mass basis. The dynamic isotope power system and nuclear reactor power system architectures had significantly lower total masses than the photovoltaic system architectures. Integrated development and deployment time phasing plans were completed for an example DIPS and reactor architecture option to determine the development strategies required to meet the mission scenario requirements.

  17. Guideline on radiation protection requirements for ionizing radiation shielding in nuclear power plants

    International Nuclear Information System (INIS)

    1988-01-01

    The guideline which entered into force on 1 May 1988 stipulates the radiation protection requirements for shielding against ionizing radiation to be met in the design, construction, commissioning, operation, and decommissioning of nuclear power plants

  18. Neural net based determination of generator-shedding requirements in electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M [Electrical Engineering Inst. ' Nikola Tesla' , Belgrade (Yugoslavia); Sobajic, D J; Pao, Y -H [Case Western Reserve Univ., Cleveland, OH (United States). Dept. of Electrical Engineering and Applied Physics Case Western Reserve Univ., Cleveland, OH (United States). Dept. of Computer Engineering and Science AI WARE Inc., Cleveland, OH (United States)

    1992-09-01

    This paper presents an application of artificial neural networks (ANN) in support of a decision-making process by power system operators directed towards the fast stabilisation of multi-machine systems. The proposed approach considers generator shedding as the most effective discrete supplementary control for improving the dynamic performance of faulted power systems and preventing instabilities. The sensitivity of the transient energy function (TEF) with respect to changes in the amount of dropped generation is used during the training phase of ANNs to assess the critical amount of generator shedding required to prevent the loss of synchronism. The learning capabilities of neural nets are used to establish complex mappings between fault information and the amount of generation to be shed, suggesting it as the control signal to the power system operator. (author)

  19. Development of the Ukrainian power sector taking into account the environmental impact of power facilities

    International Nuclear Information System (INIS)

    Dyakova, E.; Krymskaya, L.

    1997-01-01

    This paper concentrates on the following problems: Evaluation of total environmental impacts from all kinds of power plants on the whole territory of Ukraine; evaluation of environmental impacts in selected regions due to uneven power facilities distribution. Analysis of the environmental situation in Ukraine was conducted using the IMPACTS module of the ENPEP package with account to the Ukrainian energy requirements in perspective. Some recommendations concerning the development of power facilities and reduction of air emissions are also given. (author). 7 figs, 5 tabs

  20. Development of the Ukrainian power sector taking into account the environmental impact of power facilities

    Energy Technology Data Exchange (ETDEWEB)

    Dyakova, E; Krymskaya, L [Institute for Nuclear Research, National Academy of Science, Kiev (Ukraine)

    1997-09-01

    This paper concentrates on the following problems: Evaluation of total environmental impacts from all kinds of power plants on the whole territory of Ukraine; evaluation of environmental impacts in selected regions due to uneven power facilities distribution. Analysis of the environmental situation in Ukraine was conducted using the IMPACTS module of the ENPEP package with account to the Ukrainian energy requirements in perspective. Some recommendations concerning the development of power facilities and reduction of air emissions are also given. (author). 7 figs, 5 tabs.

  1. Land-Use Requirements for Solar Power Plants in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Ong, S.; Campbell, C.; Denholm, P.; Margolis, R.; Heath, G.

    2013-06-01

    This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

  2. Power generation

    International Nuclear Information System (INIS)

    Nunez, Anibal D.

    2001-01-01

    In the second half of twentieth century, nuclear power became an industrial reality. Now the operating 433 power plants, the 37 plants under construction, near 9000 years/reactor with only one serious accident with emission of radioactive material to the environment (Chernobyl) show the maturity of this technology. Today nuclear power contribute a 17% to the global generation and an increase of 75 % of the demand of electricity is estimated for 2020 while this demand is expected to triplicate by 2050. How this requirement can be satisfied? All the indicators seems to demonstrate that nuclear power will be the solution because of the shortage of other sources, the increase of the prices of the non renewable fuels and the scarce contribution of the renewable ones. In addition, the climatic changes produced by the greenhouse effect make even more attractive nuclear power. The situation of Argentina is analyzed and compared with other countries. The convenience of an increase of nuclear power contribution to the total national generation seems clear and the conclusion of the construction of the Atucha II nuclear power plant is recommended

  3. Assessment of infrastructure development requirements for embarking on nuclear power program in Macedonia

    International Nuclear Information System (INIS)

    Popov, N.; Ilijovski, I.; Popovski, V.

    2015-01-01

    Over the past decades nuclear energy has been proven as reliable and economical energy supply that is capable of meeting demanding energy market requirements. Many countries around the world consider entering into new nuclear energy programs and building new power reactors for satisfying their increasing electrical energy needs. A nuclear power program is a major undertaking requiring careful planning, preparation and investment, and human resources for building adequate nuclear infrastructure. Preparations for making a decision to enter into a new nuclear energy program requires a significant amount of financial and human resources, time, and assistance from already developed countries and international nuclear organizations. The International Atomic Energy Agency (IAEA) from Vienna provides technical help, financial assistance, and documented knowledge that are important for countries facing the challenge of entering nuclear programs for the first time. The IAEA organizes technical courses and information exchange meetings for new countries at which experiences and lessons learned are provided to new countries. This paper describes the key activities in the process for making a decision to enter a new nuclear energy program. It describes the efforts currently being conducted in the Republic of Macedonia in the direction of collecting information, performing various feasibility studies, and engaging in regional cooperation for utilizing experiences of the regional countries in performing such activities, and in developing their nuclear power programs. This paper also provides an overview of the IAEA documents and recommendations that are relevant for this topic

  4. Impact of extreme load requirements and quality assurance on nuclear power plant costs

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1993-01-01

    Definitive costs, applicable to nuclear power plant concrete structures, as a function of National Regulatory Requirements, standardization, the effect of extreme load design associated with both design basis accidents and extreme external events and quality assurance are difficult to develop since such effects are interrelated and not only differ widely from country to country, project to project but also vary in time. Table 1 shows an estimate of the of the overall plant cost effects of external event extreme load design on nuclear power plant design for the U.S -and selected foreign countries for which experience with LWRs exist- Germany is the most expensive primarily due to a military aircraft crash resistance. However, the German requirement for 4 safeguards trains rather than 2 and the containment design requirement to consider one Steam Generator blowdown concurrent with a RCS blowdown. This presentation will concentrate on the direct current impact extreme load design and quality assurance have on concrete structures, systems and components for nuclear plants. This presentation is considered timely due to the increased interest in the c potential backfit of Eastern European nuclear power stations of the WWER 440 and WWER 1000 types which typically did not consider the extreme loads identified in Table 1 and accident loads in Table 3 and quality assurance in Table 5 in their original design. Concrete structures in particular are highlighted because they typically form the last barrier to radioactive release from the containment and other Safety Related Structures

  5. Cooling water requirements and nuclear power plants

    International Nuclear Information System (INIS)

    Rao, T.S.

    2010-01-01

    Indian nuclear power programme is poised to scuttle the energy crisis of our time by proposing joint ventures for large power plants. Large fossil/nuclear power plants (NPPs) rely upon water for cooling and are therefore located near coastal areas. The amount of water a power station uses and consumes depends on the cooling technology used. Depending on the cooling technology utilized, per megawatt existing NPPs use and consume more water (by a factor of 1.25) than power stations using other fuel sources. In this context the distinction between 'use' and 'consume' of water is important. All power stations do consume some of the water they use; this is generally lost as evaporation. Cooling systems are basically of two types; Closed cycle and Once-through, of the two systems, the closed cycle uses about 2-3% of the water volumes used by the once-through system. Generally, water used for power plant cooling is chemically altered for purposes of extending the useful life of equipment and to ensure efficient operation. The used chemicals effluent will be added to the cooling water discharge. Thus water quality impacts on power plants vary significantly, from one electricity generating technology to another. In light of massive expansion of nuclear power programme there is a need to develop new ecofriendly cooling water technologies. Seawater cooling towers (SCT) could be a viable option for power plants. SCTs can be utilized with the proper selection of materials, coatings and can achieve long service life. Among the concerns raised about the development of a nuclear power industry, the amount of water consumed by nuclear power plants compared with other power stations is of relevance in light of the warming surface seawater temperatures. A 1000 MW power plant uses per day ∼800 ML/MW in once through cooling system; while SCT use 27 ML/MW. With the advent of new marine materials and concrete compositions SCT can be constructed for efficient operation. However, the

  6. Projected uranium requirements of developing countries

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The objective of this paper is to examine the uranium requirements of developing countries both in aggregate and individually. Although the cumulative uranium requirements of these countries are expected to account for less than eight percent of total requirements, the fact that many of these countries are expressing renewed interest in nuclear is, in itself, encouraging. The countries analyzed in this paper are Argentina, Brazil, Egypt, India, Israel, Mexico, Pakistan, South Africa, South Korea and Taiwan. For each country, the existing and planned nuclear capacity levels have been identified and capacity factors have been projected. For countries with no previous nuclear power, the world weighted average capacity factor for the specific reactor type is utilized. Other factors influencing nuclear power demand and operations of these developing countries will be discussed, and finally, uranium requirements based on a calculated optimal tails assay of .30 will be provided

  7. Prediction equation for estimating total daily energy requirements of special operations personnel.

    Science.gov (United States)

    Barringer, N D; Pasiakos, S M; McClung, H L; Crombie, A P; Margolis, L M

    2018-01-01

    Special Operations Forces (SOF) engage in a variety of military tasks with many producing high energy expenditures, leading to undesired energy deficits and loss of body mass. Therefore, the ability to accurately estimate daily energy requirements would be useful for accurate logistical planning. Generate a predictive equation estimating energy requirements of SOF. Retrospective analysis of data collected from SOF personnel engaged in 12 different SOF training scenarios. Energy expenditure and total body water were determined using the doubly-labeled water technique. Physical activity level was determined as daily energy expenditure divided by resting metabolic rate. Physical activity level was broken into quartiles (0 = mission prep, 1 = common warrior tasks, 2 = battle drills, 3 = specialized intense activity) to generate a physical activity factor (PAF). Regression analysis was used to construct two predictive equations (Model A; body mass and PAF, Model B; fat-free mass and PAF) estimating daily energy expenditures. Average measured energy expenditure during SOF training was 4468 (range: 3700 to 6300) Kcal·d- 1 . Regression analysis revealed that physical activity level ( r  = 0.91; P  plan appropriate feeding regimens to meet SOF nutritional requirements across their mission profile.

  8. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    Science.gov (United States)

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  9. The power of cross-functional teams in driving total quality

    Science.gov (United States)

    Mcclung, Tim M.; Mcmaster, Tom J.

    1992-01-01

    Garrett Canada, a Division of Allied-Signal Aerospace Canada, has been a member of the Canadian aerospace industry for 40 years. Although Garrett Canada has always been a profitable division with a solid market share, the changing and turbulent business environment and globalization of the aerospace industry has created new demands and challenges. The marketplace is demanding faster introduction of new products, as well as shorter leadtimes for repairs and spares. It was recognized that reducing cycle times for new products and for ongoing production would not only satisfy our customers, it would also enhance our business performance through reduced inventories, lower past due, and more responsiveness to change. It was evident that drastic function changes were required if we were to maintain our position as a premier aerospace supplier. The challenge was to convert a stable, somewhat slow-paced work environment with strong functional boundaries into a boundaryless world class team functioning in a total quality environment and focused on customer satisfaction. Complete and uncompromised customer satisfaction has become our driving force, with Total Quality being our engine to continuously improve our processes and increase our speed. The way in which this transition has been brought about is the subject of this presentation.

  10. Measurement of total ultrasonic power using thermal expansion and change in buoyancy of an absorbing target.

    Science.gov (United States)

    Dubey, P K; Kumar, Yudhisther; Gupta, Reeta; Jain, Anshul; Gohiya, Chandrashekhar

    2014-05-01

    The Radiation Force Balance (RFB) technique is well established and most widely used for the measurement of total ultrasonic power radiated by ultrasonic transducer. The technique is used as a primary standard for calibration of ultrasonic transducers with relatively fair uncertainty in the low power (below 1 W) regime. In this technique, uncertainty comparatively increases in the range of few watts wherein the effects such as thermal heating of the target, cavitations, and acoustic streaming dominate. In addition, error in the measurement of ultrasonic power is also caused due to movement of absorber at relatively high radiated force which occurs at high power level. In this article a new technique is proposed which does not measure the balance output during transducer energized state as done in RFB. It utilizes the change in buoyancy of the absorbing target due to local thermal heating. The linear thermal expansion of the target changes the apparent mass in water due to buoyancy change. This forms the basis for the measurement of ultrasonic power particularly in watts range. The proposed method comparatively reduces uncertainty caused by various ultrasonic effects that occur at high power such as overshoot due to momentum of target at higher radiated force. The functionality of the technique has been tested and compared with the existing internationally recommended RFB technique.

  11. Measurement of total ultrasonic power using thermal expansion and change in buoyancy of an absorbing target

    Science.gov (United States)

    Dubey, P. K.; Kumar, Yudhisther; Gupta, Reeta; Jain, Anshul; Gohiya, Chandrashekhar

    2014-05-01

    The Radiation Force Balance (RFB) technique is well established and most widely used for the measurement of total ultrasonic power radiated by ultrasonic transducer. The technique is used as a primary standard for calibration of ultrasonic transducers with relatively fair uncertainty in the low power (below 1 W) regime. In this technique, uncertainty comparatively increases in the range of few watts wherein the effects such as thermal heating of the target, cavitations, and acoustic streaming dominate. In addition, error in the measurement of ultrasonic power is also caused due to movement of absorber at relatively high radiated force which occurs at high power level. In this article a new technique is proposed which does not measure the balance output during transducer energized state as done in RFB. It utilizes the change in buoyancy of the absorbing target due to local thermal heating. The linear thermal expansion of the target changes the apparent mass in water due to buoyancy change. This forms the basis for the measurement of ultrasonic power particularly in watts range. The proposed method comparatively reduces uncertainty caused by various ultrasonic effects that occur at high power such as overshoot due to momentum of target at higher radiated force. The functionality of the technique has been tested and compared with the existing internationally recommended RFB technique.

  12. Measurement of total ultrasonic power using thermal expansion and change in buoyancy of an absorbing target

    International Nuclear Information System (INIS)

    Dubey, P. K.; Kumar, Yudhisther; Gupta, Reeta; Jain, Anshul; Gohiya, Chandrashekhar

    2014-01-01

    The Radiation Force Balance (RFB) technique is well established and most widely used for the measurement of total ultrasonic power radiated by ultrasonic transducer. The technique is used as a primary standard for calibration of ultrasonic transducers with relatively fair uncertainty in the low power (below 1 W) regime. In this technique, uncertainty comparatively increases in the range of few watts wherein the effects such as thermal heating of the target, cavitations, and acoustic streaming dominate. In addition, error in the measurement of ultrasonic power is also caused due to movement of absorber at relatively high radiated force which occurs at high power level. In this article a new technique is proposed which does not measure the balance output during transducer energized state as done in RFB. It utilizes the change in buoyancy of the absorbing target due to local thermal heating. The linear thermal expansion of the target changes the apparent mass in water due to buoyancy change. This forms the basis for the measurement of ultrasonic power particularly in watts range. The proposed method comparatively reduces uncertainty caused by various ultrasonic effects that occur at high power such as overshoot due to momentum of target at higher radiated force. The functionality of the technique has been tested and compared with the existing internationally recommended RFB technique

  13. A study for the establishment of regulatory requirement and evaluation guide for station blackout in nuclear power plants

    International Nuclear Information System (INIS)

    Lim, J. H.; Koo, C. S.; Joo, W. P.; Oh, S. H.; Shin, W. K.

    1999-01-01

    The consequence of SBO event could be a severe accident unless AC power was restored within a proper time, because many safety systems depend upon AC power. Based on the severity, the SBO has been extensively studied since it was identified as Unresolved Safety Issue at USNRC. The resolution of those studies is a rule-making such as 10 CFR 50.63 and Regulatory Guide 1.155. But there is no regulatory requirements of SBO for an operating domestic nuclear power plant up to the present time. This tudy has established SBO rule(regulatory requirements and evaluation guides) for an operating PWR type of the operating nuclear power plants in Korea

  14. Effect of variable power levels on the yield of total aerosol mass and formation of aldehydes in e-cigarette aerosols.

    Science.gov (United States)

    Gillman, I G; Kistler, K A; Stewart, E W; Paolantonio, A R

    2016-03-01

    The study objective was to determine the effect of variable power applied to the atomizer of refillable tank based e-cigarette (EC) devices. Five different devices were evaluated, each at four power levels. Aerosol yield results are reported for each set of 25 EC puffs, as mass/puff, and normalized for the power applied to the coil, in mass/watt. The range of aerosol produced on a per puff basis ranged from 1.5 to 28 mg, and, normalized for power applied to the coil, ranged from 0.27 to 1.1 mg/watt. Aerosol samples were also analyzed for the production of formaldehyde, acetaldehyde, and acrolein, as DNPH derivatives, at each power level. When reported on mass basis, three of the devices showed an increase in total aldehyde yield with increasing power applied to the coil, while two of the devices showed the opposite trend. The mass of formaldehyde, acetaldehyde, and acrolein produced per gram of total aerosol produced ranged from 0.01 to 7.3 mg/g, 0.006 to 5.8 mg/g, and acrolein from EC aerosols from specific devices, and were compared to estimated exposure from consumption of cigarettes, to occupational and workplace limits, and to previously reported results from other researchers. Copyright © 2015 The Authors. Published by Elsevier Inc. All rights reserved.

  15. Ergonomic requirements on computer-based information- and handling engineering in nuclear power plants

    International Nuclear Information System (INIS)

    Fassmann, W.

    2002-01-01

    This project provides regulatory authorities with a set of criteria for evaluating hybrid man-machine interfaces in nuclear power plant control rooms from a human factors point of view. Such standards are necessary for two reasons: (1) More and more computerised information and control systems have been and will be introduced in nuclear power plant control rooms. One possible result of this trend will be the creation of hybrid man machine interfaces which will provide both conventional and computer-based display and control devices. (2) Available rules and regulations do not contain detailed requirements on how to integrate both types of interface in such a way that plant operation by means of hybrid interfaces will be performed at least as reliably and safely as by means of conventional ones. To fill this gap, criteria and methods were developed which support practical checks of requirements to be applied to hybrid control rooms. This approach is based on state of the art methods and criteria in ergonomics. It makes it possible to analyse and to describe personnel's actions in a consistent and structured way in order to provide the information which is necessary for evaluating human reliability of task performance. Reliability can be evaluated with respect to - accuracy of required information on displays, - networking of tasks, - possibilities of interrupting and cancelling measures which have already been initiated, - possibility to carry out required manuel actions, - level of mental work-strain, - workload level, - probability of erroneous actions. This method is part of a catalogue of recommendations for evaluating hybrid nuclear power plant control rooms. The catalogue also contains recommendations for the design of computerised parts of the man-machine-interface. Application of these design recommendations will help create favourable conditions for an acceptable level of work-strain and for reliable task performance. (orig.) [de

  16. Determination of Power Required through Accelerated Flight with Application to Unmanned Vehicles

    Science.gov (United States)

    Soltmann, Lars Michael

    Power required analysis is an important element of aircraft performance. The primary method for measuring this parameter is the classic PIW-VIW (power and velocity independent of weight) method which was developed in the first half of the 20th century. This method was originally developed for use with manned aircraft and therefore has some shortcomings when applied to unmanned aircraft, specifically those that are remotely piloted. The proposed method estimates the lift and drag models using the maximum likelihood technique which was applied to data acquired through acceleration and deceleration runs under the assumption that the pitch rate and lateral dynamics are negligible. The acceleration runs were performed by applying full throttle while the aircraft was flying just above the stall velocity and allowing it to naturally accelerate to maximum level flight velocity. The deceleration runs were performed in the opposite manner where the throttle was set to zero while the aircraft was ying at maximum velocity and allowed to naturally slow down until stall was reached. The collected data is reduced using the PIW-VIW technique whereby a single power curve is generated that is independent of aircraft weight and air density. Simulations indicate that deviations from the designed maneuvers, such as altitude changes and low pitch rates, are acceptable and do not change the resulting power curves. A hard limit on what constitutes low pitch rate was difficult to establish as system noise played a large role in determining the signal-to-noise ratio limit on the pitch rate. However, based on a model analysis it was concluded that the pitch rate could be safely ignored without consequences to the results. A low cost Raspberry Pi data collection system was designed for use on two test aircraft, the commercially available Nexstar and a reconfigurable research aircraft called Astraeus. Data points using the classic PIW-VIW method were collected during the flight test program

  17. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  18. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Design Requirements Document (DRD)

    Science.gov (United States)

    Rigo, H. S.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Bents, D. J.; Hatch, A. M.

    1981-01-01

    A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.

  19. Statement on safety requirements concerning the long-term operation of the Muehleberg nuclear power station

    International Nuclear Information System (INIS)

    2012-12-01

    This report published by the Swiss Federal Nuclear Safety Inspectorate ENSI investigates the safety requirements with respect to the long-term operation of the Muehleberg nuclear power station in Switzerland. Relevant international requirements and Swiss legal stipulations concerning the long-term operation of the power station are stated. The management of aging processes is looked at. The regular verification of the integrity of various plant components such as containments, piping, steam generation system, etc. is looked at in detail. The state-of-the-art concerning deterministic accident analyses and refitting technology are discussed, as are automated safety systems. The applicable laws, decrees and guidelines are listed in appendices

  20. Technical evaluation of RETS-required reports for Kewaunee Nuclear Power Plant for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at the Kewaunee Nuclear Power Plant during 1983 was performed. The periodic reports reviewed were the two Semiannual Effluent Release Reports for 1983 and the annual Kewaunee Environmental Radioactivity Survey. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  1. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Spanish Edition); Seguridad de las centrales nucleares: Diseno. Requisitos de seguridad especificos

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  2. Civil engineering in power plant technology

    International Nuclear Information System (INIS)

    Krolewski, H.

    1982-01-01

    Guaranteeing our power supplies requires increasingly large, bold or novel construction works (for example, 200 m chimney with installation of stays over a wide area for a wind power plant in Spain; up to 400 m structure height on floating drill rigs). The layman admires the impressiveness with which these demand great ability and responsibility on the part of the civil engineer. The inland power station builder has to concentrate on few spectacular methods of construction or dimensions. The success of the total undertaking is however no less attributable to structural prerequisites. Civil engineering problems have to be displaced by means of static and dynamic problems in order to meet licensing requirements (planning of construction supervision, fire prevention, structure of supply and disposal). (orig.) [de

  3. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  4. Observability of wind power

    International Nuclear Information System (INIS)

    Gonot, J.P.; Fraisse, J.L.

    2009-01-01

    The total installed capacity of wind power grows from a few hundred MW at the beginning of 2005 to 3400 MW at the end of 2008. With such a trend, a total capacity of 7000 MW could be reached by 2010. The natural variability of wind power and the difficulty of its predictability require a change in the traditional way of managing supply/demand balance, day-ahead margins and the control of electrical flows. As a consequence, RTE operators should be informed quickly and reliably of the real time output power of wind farms and of its evolvement some hours or days ahead to ensure the reliability of the French electrical power system. French specificities are that wind farms are largely spread over the territory, that 95 % of wind farms have an output power below 10 MW and that they are connected to the distribution network. In this context, new tools were necessary to acquire as soon as possible data concerning wind power. In two years long, RTE set up an observatory of wind production 'IPES system' enable to get an access to the technical characteristics of the whole wind farms, to observe in real time 75 % of the wind generation and to implement a forecast model related to wind generation. (authors)

  5. Requirement analysis for autonomous systems and intelligent agents in future Danish electric power systems

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten

    2010-01-01

    we review innovative control architectures in electric power systems such as Microgrids, Virtual power plants and Cell based systems. We evaluate application of autonomous systems and intelligent agents in each of these control architectures particularly in the context of Denmark's strategic energy...... plans. The second part formulates a flexible control architecture for electric power systems with very high penetration of distributed generation. This control architecture is based upon the requirements identified in the first part. We also present development of a software framework to test......Denmark has already achieved a record of 20% penetration of wind power and now moving towards even higher targets with an increasing part of the electricity produced by distributed generators (DGs). In this paper we report work from a sub activity "subgrid design" of the EcoGrid.dk project. First...

  6. A framework for regulatory requirements and industry standards for new nuclear power plants

    International Nuclear Information System (INIS)

    Duran, Felicia A.; Camp, Allen L.; Apostolakis, George E.; Golay, Michael W.

    2000-01-01

    This paper summarizes the development of a framework for risk-based regulation and design for new nuclear power plants. Probabilistic risk assessment methods and a rationalist approach to defense in depth are used to develop a framework that can be applied to identify systematically the regulations and standards required to maintain the desired level of safety and reliability. By implementing such a framework, it is expected that the resulting body of requirements will provide a regulatory environment that will ensure protection of the public, will eliminate the burden of requirements that do not contribute significantly to safety, and thereby will improve the market competitiveness of new plants. (author)

  7. ASDEX Upgrade-JT-60U comparison and ECRH power requirements for NTM stabilization in ITER

    International Nuclear Information System (INIS)

    Urso, L.; Zohm, H.; Maraschek, M.; Poli, E.; Isayama, A.

    2010-01-01

    Neoclassical tearing modes (NTMs) are experimentally controlled with local electron cyclotron current drive (ECCD) and the island width decay during NTM stabilization is modelled using the so-called modified Rutherford equation (MRE). In this paper, a modelling of the MRE is carried out and simulations of the island width decay are compared with the experimentally observed ones in order to fit the two free machine-independent parameters present in the equation. A systematic study on a database of NTM stabilization discharges from ASDEX Upgrade and JT-60U is done for extrapolating the ECCD power requirements for ITER. The extrapolation to ITER of the NTM stabilization results from ASDEX Upgrade and JT-60U shows that 10 MW of ECCD power are enough to stabilize large NTMs. The 10 MW power estimate for ITER is based on the assumption that the free parameters in the MRE are machine independent. Indeed, this assumption is verified in this paper for ASDEX Upgrade and JT-60U. An interesting consequence of the relatively modest power requirement for ITER is that the installed 20 MW will suffice for simultaneous 2/1 and 3/2 NTM stabilization.

  8. Eddy current and total power loss separation in the iron-phosphate-polyepoxy soft magnetic composites

    International Nuclear Information System (INIS)

    Taghvaei, A.H.; Shokrollahi, H.; Janghorban, K.; Abiri, H.

    2009-01-01

    This work investigates the magnetic properties of iron-phosphate-polyepoxy soft magnetic composite materials. FTIR spectra, EDX analysis, distribution maps, X-ray diffraction pattern and density measurements show that the particles surface layer contains a thin layer of nanocrystalline/amorphous phosphate with high coverage of powders surface. In this paper, a formula for calculating the eddy current loss and total loss components by loss separation method is presented and finally the different parts of power losses are calculated. The results show that, the contribution of eddy current in the bulk material for single coating layer (k b = 0.18) is higher in comparison with double coating layer (k b = 0.09). Moreover, iron-phosphate-polyepoxy composites (P = 0.000004f 2 ) have lower power loss in comparison with iron-phosphate composites (P = 0.00002f 2 ).

  9. Energy management system for power distribution. Interfaces and data communication requirements

    International Nuclear Information System (INIS)

    Koponen, P.; Lemstroem, B.; Ikonen, J.

    1995-01-01

    The opening of the electricity market for competition in Finland creates new requirements for the information systems and data communication in distribution utilities. Energy management systems for distribution utilities are needed with interfaces that make it possible to separate the network business from the energy trade business. However, these interfaces should also support optimization of the whole energy supply system of the country. In this report the interfaces and data communication requirements of the energy management system of the electricity trade business are analyzed. To support this subfunctions of the energy management have been analyzed. It was realized that the amount of necessary data transfer and optimization of the national power system both depend strongly on the general rules of the energy markets. (author)

  10. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  11. Totally implantable total artificial heart and ventricular assist device with multipurpose miniature electromechanical energy system.

    Science.gov (United States)

    Takatani, S; Orime, Y; Tasai, K; Ohara, Y; Naito, K; Mizuguchi, K; Makinouchi, K; Damm, G; Glueck, J; Ling, J

    1994-01-01

    A multipurpose miniature electromechanical energy system has been developed to yield a compact, efficient, durable, and biocompatible total artificial heart (TAH) and ventricular assist device (VAD). Associated controller-driver electronics were recently miniaturized and converted into hybrid circuits. The hybrid controller consists of a microprocessor and controller, motor driver, Hall sensor, and commutation circuit hybrids. The sizing study demonstrated that all these components can be incorporated in the pumping unit of the TAH and VAD, particularly in the centerpiece of the TAH and the motor housing of the VAD. Both TAH and VAD pumping units will start when their power line is connected to either the internal power pack or the external battery unit. As a redundant driving and diagnostic port, an emergency port was newly added and will be placed in subcutaneous location. In case of system failure, the skin will be cut down, and an external motor drive or a pneumatic driver will be connected to this port to run the TAH. This will minimize the circulatory arrest time. Overall efficiency of the TAH without the transcutaneous energy transmission system was 14-18% to deliver pump outputs of 4-9 L/min against the right and left afterload pressures of 25 and 100 mm Hg. The internal power requirement ranged from 6 to 13 W. The rechargeable batteries such as NiCd or NiMH with 1 AH capacity can run the TAH for 30-45 min. The external power requirement, when TETS efficiency of 75% was assumed, ranged from 8 to 18 W. The accelerated endurance test in the 42 degrees C saline bath demonstrated stable performance over 4 months. Long-term endurance and chronic animal studies will continue toward a system with 5 years durability by the year 2000.

  12. An overview of some basic design features of Koeberg Nuclear Power Station highlighting how regulatory requirements can influence design

    International Nuclear Information System (INIS)

    Morrison, A.R.

    1985-01-01

    The paper attempts to show that licensing requirements significantly influence the design of nuclear power plants. The French designed Pressurised Water Reactor system adopted by Escom at Koeberg has its origins in the General Design Criteria set out in the American Code of Federal Regulations document 10CFR50. Three of the General Design Criteria have been selected for illustrating how the requirements have influenced Koeberg in terms of design, both from a hardware and software view point. The requirements of the criteria on quality standard and records are to a certain extent reflected in the Licensing Branch Guide developed by the Atomic Energy Corporation to address quality assurance. The criterion on containment design sets requirements in respect of containment design which are incorporated in the Koeberg design. The criterion on electric power systems sets many of the basic design requirements for the electrical power supply systems inside and outside the station. The existence of the criterion led Escom to introduce changes in the transmission network to meet the requirements in respect of the independent criteria for the grid connections

  13. Powering and Machine Protection of the Superconducting LHC Accelerator

    CERN Document Server

    Zerlauth, M

    2004-01-01

    A very large number of magnets, both superconducting and conventional copper conductor magnets, are installed in the LHC (Large Hadron Collider) for the guidance of the two proton beams around the circumference. In total, the LHC counts 1614 different electrical circuits with 1712 power converters for DC powering of the superconducting and normal conducting magnets. Besides the electrical circuits connecting main magnets for bending and focusing of the two counter-rotating beams, the demanding requirements on the quality of the magnetic fields require a large number of circuits for corrector magnets distributed around the circumference. In total, more than 10000 magnets will need to be connected to the power converters via a large inventory of electrical components such as normal conducting cables and tubes, energy extraction systems, current feedthroughs and superconducting busbars. Depending on the complexity and importance of these electrical circuits and their components, various systems will interact for...

  14. Feedback Blunting: Total Sleep Deprivation Impairs Decision Making that Requires Updating Based on Feedback

    Science.gov (United States)

    Whitney, Paul; Hinson, John M.; Jackson, Melinda L.; Van Dongen, Hans P.A.

    2015-01-01

    Study Objectives: To better understand the sometimes catastrophic effects of sleep loss on naturalistic decision making, we investigated effects of sleep deprivation on decision making in a reversal learning paradigm requiring acquisition and updating of information based on outcome feedback. Design: Subjects were randomized to a sleep deprivation or control condition, with performance testing at baseline, after 2 nights of total sleep deprivation (or rested control), and following 2 nights of recovery sleep. Subjects performed a decision task involving initial learning of go and no go response sets followed by unannounced reversal of contingencies, requiring use of outcome feedback for decisions. A working memory scanning task and psychomotor vigilance test were also administered. Setting: Six consecutive days and nights in a controlled laboratory environment with continuous behavioral monitoring. Subjects: Twenty-six subjects (22–40 y of age; 10 women). Interventions: Thirteen subjects were randomized to a 62-h total sleep deprivation condition; the others were controls. Results: Unlike controls, sleep deprived subjects had difficulty with initial learning of go and no go stimuli sets and had profound impairment adapting to reversal. Skin conductance responses to outcome feedback were diminished, indicating blunted affective reactions to feedback accompanying sleep deprivation. Working memory scanning performance was not significantly affected by sleep deprivation. And although sleep deprived subjects showed expected attentional lapses, these could not account for impairments in reversal learning decision making. Conclusions: Sleep deprivation is particularly problematic for decision making involving uncertainty and unexpected change. Blunted reactions to feedback while sleep deprived underlie failures to adapt to uncertainty and changing contingencies. Thus, an error may register, but with diminished effect because of reduced affective valence of the feedback

  15. Environmental radiation monitoring during visits of nuclear powered warships to Australian ports: requirements, arrangements and procedures

    International Nuclear Information System (INIS)

    1988-05-01

    The Commonwealth Government has determined conditions to be met when nuclear powered warships visit Australian ports. These conditions include a requirement that appropriate State/Territory and Commonwealth authorities provide a radiation monitoring program to determine whether any radioactivity has been discharged or accidently released from a nuclear powered warship in port; to determine actual or potential levels of any consequent exposure to radiation of members of the public; and to provide this information within a timescale that allows remedial action to be taken. Part 1 of this document sets out the requirements of a radiation monitoring program capable of meeting these objectives. The fundamental arrangements and procedures for implementing the requirements are presented at Part 2 and provide a basis for the development of fully detailed, port specific, radiation monitoring programs

  16. 47 CFR 15.216 - Disclosure requirements for wireless microphones and other low power auxiliary stations capable...

    Science.gov (United States)

    2010-10-01

    ... Intentional Radiators Radiated Emission Limits, Additional Provisions § 15.216 Disclosure requirements for... following disclosure requirements: (1) Such persons must display the consumer disclosure text, as specified... point of sale or lease of each such low power auxiliary station. The text must be displayed in a clear...

  17. Interpreting Space-Mission LET Requirements for SEGR in Power MOSFETs

    Science.gov (United States)

    Lauenstein, J. M.; Ladbury, R. L.; Batchelor, D. A.; Goldsman, N.; Kim, H. S.; Phan, A. M.

    2010-01-01

    A Technology Computer Aided Design (TCAD) simulation-based method is developed to evaluate whether derating of high-energy heavy-ion accelerator test data bounds the risk for single-event gate rupture (SEGR) from much higher energy on-orbit ions for a mission linear energy transfer (LET) requirement. It is shown that a typical derating factor of 0.75 applied to a single-event effect (SEE) response curve defined by high-energy accelerator SEGR test data provides reasonable on-orbit hardness assurance, although in a high-voltage power MOSFET, it did not bound the risk of failure.

  18. Total energy calculations from self-energy models

    International Nuclear Information System (INIS)

    Sanchez-Friera, P.

    2001-06-01

    Density-functional theory is a powerful method to calculate total energies of large systems of interacting electrons. The usefulness of this method, however, is limited by the fact that an approximation is required for the exchange-correlation energy. Currently used approximations (LDA and GGA) are not sufficiently accurate in many physical problems, as for instance the study of chemical reactions. It has been shown that exchange-correlation effects can be accurately described via the self-energy operator in the context of many-body perturbation theory. This is, however, a computationally very demanding approach. In this thesis a new scheme for calculating total energies is proposed, which combines elements from many-body perturbation theory and density-functional theory. The exchange-correlation energy functional is built from a simplified model of the self-energy, that nevertheless retains the main features of the exact operator. The model is built in such way that the computational effort is not significantly increased with respect to that required in a typical density-functional theory calculation. (author)

  19. Safe and green nuclear power

    International Nuclear Information System (INIS)

    Kushwaha, H.S.

    2010-01-01

    Energy development plays an important role in the national economic growth. Presently the per capita consumption of energy in our country is about 750 kWh including captive power generation which is low in comparison to that in the developed countries like USA where it is about 12,000 kWh. As of now the total installed capacity of electricity generation is about 152,148 MW(e) which is drawn from Thermal (65%), Hydel (24%), Nuclear (3%) power plants and Renewables (8%). It is expected that by the end of year 2020, the required installed capacity would be more than 3,00,000 MW(e), if we assume per capita consumption of about 800-1000 kWh for Indian population of well over one billion. To meet the projected power requirement in India, suitable options need to be identified and explored for generation of electricity. For choosing better alternatives various factors such as availability of resources, potential to generate commercial power, economic viability, etc. need to be considered. Besides these factors, an important factor which must be taken into consideration is protection of environment around the operating power stations. This paper attempts to demonstrate that the nuclear power generation is an environmentally benign option for meeting the future requirement of electricity in India. It also discusses the need for creating the public awareness about the safe operations of the nuclear power plants and ionising radiation. (author)

  20. Nuclear power of the coming century and requirements to the nuclear technology

    International Nuclear Information System (INIS)

    Orlov, V.; Leonov, V.; Sila-Novitski, A.; Smirnov, V.; Tsikunov, V.; Filin, A.

    2001-01-01

    Current state of nuclear power in the world has been considered and the reasons for its falling short of the great expectations relating to its vigorous development in the outgoing century are considered. Anticipated energy demand of mankind in the next century is evaluated, suggesting that with exhausted resources of cheap fossil fuel and ecological restrictions it can be satisfied by means of a new nuclear technology meeting the requirements of large-scale power generation in terms of safety and economic indices, moreover, the technology can be elaborated in the context of achievements made in civil and military nuclear engineering. Since the developing countries are the most interested parties, it is just their initiative in the development of nuclear technology at the next stage that could provide an impetus for its actual advance. It is shown that large-scale development of nuclear power, being adequate to increase in energy demand, is possible even if solely large NPP equipped with breeders providing BR≥1 are constructed. Requirements for the reactor and fuel cycle technologies are made, their major aspects being: efficient utilization of Pu accumulated and reduction of U specific consumption by at least an order of magnitude; natural inherent safety and deterministic elimination of accidents involving high radioactive releases; assurance of a balance between radiation hazard posed by radioactive wastes disposed and uranium extracted from the ground; nuclear weapons nonproliferation due to fuel reprocessing ruling out potentiality of Pu diversion; reduction of the new generation reactor costs below the costs of today's LWR. (author)

  1. Power converters for ITER

    CERN Document Server

    Benfatto, I

    2006-01-01

    The International Thermonuclear Experimental Reactor (ITER) is a thermonuclear fusion experiment designed to provide long deuterium– tritium burning plasma operation. After a short description of ITER objectives, the main design parameters and the construction schedule, the paper describes the electrical characteristics of the French 400 kV grid at Cadarache: the European site proposed for ITER. Moreover, the paper describes the main requirements and features of the power converters designed for the ITER coil and additional heating power supplies, characterized by a total installed power of about 1.8 GVA, modular design with basic units up to 90 MVA continuous duty, dc currents up to 68 kA, and voltages from 1 kV to 1 MV dc.

  2. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  3. 18 CFR 367.58 - Property record system required for service company property.

    Science.gov (United States)

    2010-04-01

    ... to show the nature of each addition to or retirement of service company property, the related total... required for service company property. 367.58 Section 367.58 Conservation of Power and Water Resources... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED...

  4. A Preliminary Assessment of the Initial Compression Power Requirement in CO2 Pipeline “Carbon Capture and Storage (CCS Technologies”

    Directory of Open Access Journals (Sweden)

    Abdussalam El-Suleiman

    2016-05-01

    Full Text Available CO2 captured from fossil-fueled power generation plants is said to be economically transported via pipelines over long distances. The CO2 must be compressed to pipeline specifications using compressors and pumps that are driven by gas turbine (GT or other prime movers. This paper presents the evaluation of actual work transfer or required prime power by modeling the governing equations of compression using the Peng–Robinson equation of state (PR-EOS. A computer code was developed to carry out the modeling and subsequent simulation of the compression power requirement. The simulation of prime mover power was carried out for different technology (head per stage of the compressor ranging from 10-staged compression to double stage compression. The results show that the current technology of the centrifugal compressor could require as much as 23MW of prime mover power to compress 1.5 million tonnes per year of CO2—a projected equivalent CO2 released from a 530MW combined cycle gas turbine (CCGT power generation plant.

  5. Studies on total polyphenols and reducing power of aqueous extracts from selected lamiaceae species

    Directory of Open Access Journals (Sweden)

    Maria Cioroi

    2010-08-01

    Full Text Available Certain phytochemicals in species are attracting increased attention because of a wide range of biological activities especially the possible cancer preventive properties. Polyphenols, the naturalantioxidants are present in plant extracts and they play a key role in antioxidative defence mechanisms in biological systems and they act as free radicals scavenging agents. Polyphenols might thereforeinhibit development of coronary heart disease and cancers. Basil, oregano and sage are highly fragrant plants whose leaves are used as a seasoning herb for many different types of foods. Aqueous extractswere prepared from basil (Ocimum basilicum L., oregano (Origanum vulgare L. and sage (Salvia officinalis L.. To check the phenols presence, the UV-VIS spectrum was made. The amount of polyphenolic compounds from selected Lamiaceae species was determined by spectrophotometry method using the Folin - Ciocalteau reagent and gallic acid as standard. The range of polyphenols total was between 516,352 mg/100g dried species and 859,617 mg/100g dried species.Reducing power has been established by measuring the redox potential of aqueous extracts. Antioxidant activity was directly correlated with the total amount of polyphenols in the species extracts.The free reducing sugars in aqueous extracts from species were analyzed and correlated to the total content of polyphenols.

  6. Effect of impurities and ripple upon power regulation in self-sustained tokamaks

    International Nuclear Information System (INIS)

    Bromberg, L.; Cohn, D.R.

    1981-01-01

    Tokamak power reactors will likely operate in a self sustained heating mode where additional power losses are introduced to permit higher levels of alpha particle heating (and thus higher levels of total fusion power) at thermal equilibrium. Illustrative 0-dimensional calculations are made to assess requirements for power regulation of self sustained tokamak plasmas by the use of impurity radiation. Effects of impurities upon allowable fuel density and thermal stability are determined. Requirements are calculated for passive thermal stability control by temperature driven radial motion in the presence of ripple transport losses; it appears that stability might be attained over a relatively wide temperature range with a small amount of ripple transport loss. Requirements for power regulation by the use of ripple transport are also determined

  7. Power and Frequency Control as it Relates to Wind-Powered Generation

    Energy Technology Data Exchange (ETDEWEB)

    Lacommare, Kristina S H

    2010-12-20

    This report is a part of an investigation of the ability of the U.S. power system to accommodate large scale additions of wind generation. The objectives of this report are to describe principles by which large multi-area power systems are controlled and to anticipate how the introduction of large amounts of wind power production might require control protocols to be changed. The operation of a power system is described in terms of primary and secondary control actions. Primary control is fast, autonomous, and provides the first-line corrective action in disturbances; secondary control takes place on a follow-up time scale and manages the deployment of resources to ensure reliable and economic operation. This report anticipates that the present fundamental primary and secondary control protocols will be satisfactory as wind power provides an increasing fraction of the total production, provided that appropriate attention is paid to the timing of primary control response, to short term wind forecasting, and to management of reserves for control action.

  8. How Many Model Evaluations Are Required To Predict The AEP Of A Wind Power Plant?

    International Nuclear Information System (INIS)

    Murcia, J P; Réthoré, P E; Natarajan, A; Sørensen, J D

    2015-01-01

    Wind farm flow models have advanced considerably with the use of large eddy simulations (LES) and Reynolds averaged Navier-Stokes (RANS) computations. The main limitation of these techniques is their high computational time requirements; which makes their use for wind farm annual energy production (AEP) predictions expensive. The objective of the present paper is to minimize the number of model evaluations required to capture the wind power plant's AEP using stationary wind farm flow models. Polynomial chaos techniques are proposed based on arbitrary Weibull distributed wind speed and Von Misses distributed wind direction. The correlation between wind direction and wind speed are captured by defining Weibull-parameters as functions of wind direction. In order to evaluate the accuracy of these methods the expectation and variance of the wind farm power distributions are compared against the traditional binning method with trapezoidal and Simpson's integration rules.The wind farm flow model used in this study is the semi-empirical wake model developed by Larsen [1]. Three test cases are studied: a single turbine, a simple and a real offshore wind power plant. A reduced number of model evaluations for a general wind power plant is proposed based on the convergence of the present method for each case. (paper)

  9. Total algorithms

    NARCIS (Netherlands)

    Tel, G.

    We define the notion of total algorithms for networks of processes. A total algorithm enforces that a "decision" is taken by a subset of the processes, and that participation of all processes is required to reach this decision. Total algorithms are an important building block in the design of

  10. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    International Nuclear Information System (INIS)

    2000-01-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants

  11. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  12. Total diffusing power of perturbed lattices and dissymmetry of reflections. Case of groups of defects

    International Nuclear Information System (INIS)

    Tournarie, Max

    1959-01-01

    The total diffusing power for a crystallite of any form containing a centrosymmetric defect has been established. The antisymmetrical part of the deformation potential only contributes very slightly to the primary dissymmetry. We then go on to study the case of a group of defects of the same type. The calculation converges sufficiently to describe the thermal agitation of an infinite crystal. Reprint of a paper published in 'Comptes Rendus des Seances de l'Academie des Sciences', t. 248, p. 2103-2105, sitting of April 6, 1959 [fr

  13. Power Control and Monitoring Requirements for Thermal Vacuum/Thermal Balance Testing of the MAP Observatory

    Science.gov (United States)

    Johnson, Chris; Hinkle, R. Kenneth (Technical Monitor)

    2002-01-01

    The specific heater control requirements for the thermal vacuum and thermal balance testing of the Microwave Anisotropy Probe (MAP) Observatory at the Goddard Space Flight Center (GSFC) in Greenbelt, Maryland are described. The testing was conducted in the 10m wide x 18.3m high Space Environment Simulator (SES) Thermal Vacuum Facility. The MAP thermal testing required accurate quantification of spacecraft and fixture power levels while minimizing heater electrical emissions. The special requirements of the MAP test necessitated construction of five (5) new heater racks.

  14. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapter 1, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  15. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapter 1, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  16. Policy planning for nuclear power: an overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1995-05-01

    The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. (NHA)

  17. Considerations on the Application of the IAEA Safety Requirements for the Design of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2016-05-01

    Revised to take into consideration findings from the Fukushima Daiichi nuclear power plant accident, IAEA Safety Standards Series No. SSR-2/1 (Rev. 1), Safety of Nuclear Power Plants: Design, has introduced some new concepts with respect to the earlier safety standard published in the year 2000. The preparation of SSR-2/1 (Rev. 1) was carried out with constant and intense involvement of IAEA Member States, but some new requirements, because of the novelty of the concepts introduced and the complexity of the issues, are not always interpreted in a unique way. The IAEA is confident that a complete clarification and a full understanding of the new requirements will be available when the supporting safety guides for design and safety assessment of nuclear power plants are prepared. The IAEA expects that the effort devoted to the preparation of this publication, which received input and comments from several Member States and experts, will also facilitate and harmonize the preparation or revision of these supporting standards

  18. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  19. Solar Total Energy System, Large Scale Experiment, Shenandoah, Georgia. Final technical progress report. Volume II, Section 3. Facility concept design. [1. 72 MW thermal and 383. 6 kW electric power for 42,000 ft/sup 2/ knitwear plant

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1977-10-17

    The Stearns-Roger Engineering Company conceptual design of ERDA's Large Scale Experiment No. 2 (LSE No. 2) is presented. The various LSEs are part of ERDA's Solar Total Energy Program (STES) and a separate activity of the National Solar Thermal Power Systems Program. The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demonstration projects. This particular LSE is to be located at Shenandoah, Georgia, and will provide power to the Bleyle knitwear factory. The Solar Total Energy system is sized to supply 1.720 MW thermal power and 383.6 KW electrical power. The STES is sized for the extended knitwear plant of 3902 M/sup 2/ (42,000 sq-ft) which will eventually employ 300 people. The details of studies conducted for Phase II of the Solar Total Energy System (STES) for the conceptual design requirements of the facility are presented. Included in this section are the detailed descriptions and analyses of the following subtasks: facility concept design, system concept design, performance analysis, operation plan, component and subsystem development, procurement plan, cost estimating and scheduling, and technical and management plans. (WHK)

  20. Ankle and Midfoot Power During Walking and Stair Ascent in Healthy Adults.

    Science.gov (United States)

    DiLiberto, Frank E; Nawoczenski, Deborah A; Houck, Jeff

    2018-02-27

    Ankle power dominates forward propulsion of gait, but midfoot power generation is also important for successful push off. However, it is unclear if midfoot power generation increases or stays the same in response to propulsive activities that induce larger external loads and require greater ankle power. The purpose of this study was to examine ankle and midfoot power in healthy adults during progressively more demanding functional tasks. Multi-segment foot motion (tibia, calcaneus, forefoot) and ground reaction forces were recorded as participants (N=12) walked, ascended a standard step, and ascended a high step. Ankle and midfoot positive peak power and total power, and the proportion of midfoot to ankle total power were calculated. One-way repeated measures ANOVAs were conducted to evaluate differences across tasks. Main effects were found for ankle and midfoot peak and total powers (all p power (p = .331). Ankle and midfoot power significantly increased across each task. Midfoot power increased in proportion to ankle power and in congruence to the external load of a task. Study findings may serve to inform multi-segment foot modeling applications and internal mechanistic theories of normal and pathological foot function.

  1. Comparison of Standards and Technical Requirements of Grid-Connected Wind Power Plants in China and the United States

    Energy Technology Data Exchange (ETDEWEB)

    Gao, David Wenzhong [Alternative Power Innovations, LLC; Muljadi, Eduard [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, Mackay [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wang, Weisheng [China Electric Power Research Inst. (China)

    2016-09-01

    The rapid deployment of wind power has made grid integration and operational issues focal points in industry discussions and research. Compliance with grid connection standards for wind power plants (WPPs) is crucial to ensuring the reliable and stable operation of the electric power grid. This report compares the standards for grid-connected WPPs in China to those in the United States to facilitate further improvements in wind power standards and enhance the development of wind power equipment. Detailed analyses of power quality, low-voltage ride-through capability, active power control, reactive power control, voltage control, and wind power forecasting are provided to enhance the understanding of grid codes in the two largest markets of wind power. This study compares WPP interconnection standards and technical requirements in China to those in the United States.

  2. Outlook for the power requirements by the northeast U.S. power pool: Who will serve this market?

    International Nuclear Information System (INIS)

    Anderson, E.P.

    1993-01-01

    The size of the potential natural gas market in the northeast U.S. and how it will be served are discussed. One of the most promising markets for natural gas in this area is for power generation, using combined-cycle generating units that are efficient and have low environmental impact. It is estimated that by 2002 natural gas requirements for electrical power generation in the northeast could reach 750 billion cubic feet per year. This market will be served through several new gas pipelines and through expansion of the existing pipeline capacity. Projections for electricity production for the northeast, including the New York Power pool, show an increase from 236,423 GWh in 1992 to 275,558 GWh in 2002, an increase of ca 17%. Non-utility generation will increase its share from 14% in 1992 to 26% in 2002. Utility switching to natural gas during summer months to control nitrogen oxide emissions will give natural gas more flexibility to compete with other options to reduce air pollution. Pipeline capacity additions planned for the northeast are reviewed, including the Liberty pipeline, Empire State pipeline, Portland gas transmission system, Minuteman delivery system and Mayflower gas transmission system. There will be more than adequate reliable and flexible pipeline capacity created to meet the future demand for natural gas in this region. 14 figs

  3. Total-Factor Energy Efficiency (TFEE Evaluation on Thermal Power Industry with DEA, Malmquist and Multiple Regression Techniques

    Directory of Open Access Journals (Sweden)

    Jin-Peng Liu

    2017-07-01

    Full Text Available Under the background of a new round of power market reform, realizing the goals of energy saving and emission reduction, reducing the coal consumption and ensuring the sustainable development are the key issues for thermal power industry. With the biggest economy and energy consumption scales in the world, China should promote the energy efficiency of thermal power industry to solve these problems. Therefore, from multiple perspectives, the factors influential to the energy efficiency of thermal power industry were identified. Based on the economic, social and environmental factors, a combination model with Data Envelopment Analysis (DEA and Malmquist index was constructed to evaluate the total-factor energy efficiency (TFEE in thermal power industry. With the empirical studies from national and provincial levels, the TFEE index can be factorized into the technical efficiency index (TECH, the technical progress index (TPCH, the pure efficiency index (PECH and the scale efficiency index (SECH. The analysis showed that the TFEE was mainly determined by TECH and PECH. Meanwhile, by panel data regression model, unit coal consumption, talents and government supervision were selected as important indexes to have positive effects on TFEE in thermal power industry. In addition, the negative indexes, such as energy price and installed capacity, were also analyzed to control their undesired effects. Finally, considering the analysis results, measures for improving energy efficiency of thermal power industry were discussed widely, such as strengthening technology research and design (R&D, enforcing pollutant and emission reduction, distributing capital and labor rationally and improving the government supervision. Relative study results and suggestions can provide references for Chinese government and enterprises to enhance the energy efficiency level.

  4. Energy Requirement and Comfort of Gas- and Electric-powered Hot-water Systems

    International Nuclear Information System (INIS)

    Luedemann, B.; Schmitz, G.

    1999-01-01

    In view of the continuous reduction in the specific heating energy demand of new buildings the power demand for hot-water supply increasingly dominates the heating supply of residential buildings. Furthermore, the German energy-savings-regulation 2000 (ESVO) is intended to evaluate the techniques installed such as domestic heating or hot-water supply within an overall energetic view of the building. Planning advice for domestic heating, ventilation and hot-water systems in gas-heated, low-energy buildings has therefore been developed in a common research project of the Technical University of Hamburg Harburg (TUHH) and four energy supply companies. In this article different gas-or electricity-based hot-water systems in one family houses and multiple family houses are compared with one another with regard to the aspects of comfort and power requirements considering the user's behaviour. (author)

  5. International requirements for life extension of nuclear power plants; Internationale Anforderungen zur Lebensdauerverlaengerung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Wernicke, Robert [TUeV NORD SysTec GmbH und Co. KG, Abt. Festigkeit und Konstruktion, Hamburg (Germany)

    2009-11-15

    Lifetime extension or long-term operation of nuclear facilities are topics of great international significance against the backdrop of a fleet of nuclear power plants of which many have reached 2/3 of their planned life. The article deals with the conditions for, and the specific requirements of, seeking long-term operation of nuclear power plants as established internationally and on the basis of IAEA collections. Technically, long-term operation is possible for many of the nuclear power plants in the world because, normally, they were built on the basis of conservative rules and regulations and, as a consequence, incorporate significant additional safety. Application of requirements to specific plants implies assessments of technical safety which show that conservative design philosophies created reserves and, as a consequence, there is an adequate level of safety also in long-term plant operation. For this purpose, the technical specifications must be revised, necessary additions made, and (international) operating experience taken into account and management of aging established. Two examples are presented to show how the approach to long-term plant operation is put into practice on a national level. (orig.)

  6. Application of total quality tools in the operational process modernization and optimization of large hydroelectric power plants; Aplicacao de ferramentas da qualidade total na modernizacao e otimizacao de processos operacionais de grandes usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Potenza, Luiz Frederico; Kassem, Faisal Ali; Medlo, Gerson Ricardo; Santos, Valdemir Chalito dos [Companhia Paranaense de Energia (COPEL), Capitao Leonidas Marques, PR (Brazil). Superintendencia de Gerencia da Manutencao. Area de Operacao e Manutencao Salto Caxias]. E-mail: potenza@mail.copel.br

    1998-07-01

    This work highlights a practical example of Total Quality tools application, and as the institutional changes advances, the necessity of being better and more competitive becomes evident. By using Total Quality Control tools in the modernization and optimization of operational processes for large hydroelectric power plants of the COPEL-Brazil this work contributes for the continuous increasing of the customers satisfaction and the profitability of the company.

  7. Business environment of nuclear power industry in Korea

    International Nuclear Information System (INIS)

    Lee, Yoon Young

    2003-01-01

    In Korea, there are total of 18 Nuclear Power Plants in operation as of the end of 2002 and 6 more plants are under construction. The first project for the Advanced Power Reactor (APR) 1400 nuclear power plant is being launched to provide reliable electricity economical competitiveness in Korea. The competitive business environment both globally and in Korea, where the power industry is undergoing significant restructuring, is requiring the Korean nuclear industry to continually improve the economic associated with nuclear power. Introduction of the APR 1400 design and continued improvement of local capabilities are two of the ways that the industry is responding to the challenge. (author)

  8. Measurement of neutron sensitivity of self powered neutron detectors

    International Nuclear Information System (INIS)

    Mahant, A.K.; Yeshuraja, V.; Ghodke, Shobha

    2005-01-01

    Self powered neutron detectors (SPNDs ) will form the part of Reactor Instrumentation in the upcoming 500 MWe power reactors. ECIL has developed Vanadium and Cobalt SPNDs for NPCIL to be used in regulation and protection channels. Experimental determination of neutron sensitivity of the vanadium and cobalt Self Powered Neutron Detectors (SPNDs) was carried out in A-l location of Apsara reactor at BARC. The measurements involved determination of total detector signal, its various components and the thermal neutron flux at the detector location. The paper describes the experimental techniques used to measure various parameters required to evaluate the neutron sensitivity of the SPNDs and also the parameters required to ascertain the integrity of SPNDs. Neutron flux measurement was done by gold foil irradiation technique. The predominant signal component from the vanadium SPND is Ib the current due to activation of the vanadium emitter, it forms about 85% of the total signal. The other components I n,γ due to the capture gamma rays of 52 V and I externalγ produced by the external reactor gamma rays contribute about 10% and 5% respectively to the total signal. Whereas in the cobalt SPND the main signal component is due to the capture gamma rays of 60 Co and accounts for about the 95% of the total signal. Remaining 5% signal is due to external reactor gamma rays. (author)

  9. Availability improvement factors at Taipower's nuclear power plant system

    International Nuclear Information System (INIS)

    Chen, J.H.

    1985-01-01

    Sufficient electricity to meet the needs of a growing industrial economy, is one of the most important factors in the total economic development of a nation. Currently, nuclear power is considered one of the most economical and available sources of energy. To keep pace with Taiwan's rapid economic development, while also observing our government's policy of diversifying the requirements for imported forms of energy, Taiwan Power Company has embarked upon an ambitious of nuclear power plant construction. This paper discusses the improvement of Taiwan's nuclear power plants. At the present time, Taipower has completed three nuclear power plants. Two of these are located in northern Taiwan, along the East China Sea, while the third is on the southern tip of Taiwan, bordering the South China Sea. These three plants, each with two nuclear generating units, comprise a total nuclear generating capacity of 5144 MWe

  10. Improving Power Quality in AC Supply Grids

    Directory of Open Access Journals (Sweden)

    Piotr Fabijański

    2015-12-01

    Full Text Available This paper describes a digital and actual model of the UPQC (Unified Power Quality Conditioner integrated system for power quality improvement. The UPQC’s design and its connection to an AC supply grid, 1-phase and 3-phase alike, provide effective compensation of unwanted interferences in the waveforms of load supply voltages and non-linear load currents. This article presents an overview of topologies and control strategies. The study of the UPQC confirmed its positive impact on the power quality. The electricity parameters were significantly improved. Total harmonic distortion in supply voltage THDu decreased six-fold to 1.89%, and total harmonic distortion in load current THDi decreased more than ten-fold to 2.38% for a non-linear load (uncontrolled bridge rectifier with load L. Additionally, symmetrisation of supply voltages and reactive power compensation Q of linear load was obtained. The UPQC integrated system for power quality improvement can be used wherever high-quality and PN-EN 50160 standard – compliant electricity is required.

  11. Systems required during and after an earthquake. Summary report. WWER-1000 nuclear power plants

    International Nuclear Information System (INIS)

    Monette, P.

    1995-01-01

    The scope of this document is to list the mechanical, instrumentation and electrical components required during and after earthquake, in order to achieve and maintain safe shutdown conditions of a WWER-1000 type nuclear power plant. The main objective pursued in establishing the systems and equipment list is to provide guidance for the design and implementation of the backfits which are necessary to increase seismic resistance of the components required after earthquake. The presented list is established on generic basis, i.e. it is applicable to any specific WWER-1000

  12. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapters 2--13, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  13. Continuous hydrino thermal power system

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Randell L.; Zhao, Guibing; Good, William [BlackLight Power, Inc., 493 Old Trenton Road, Cranbury, NJ 08512 (United States)

    2011-03-15

    The specifics of a continuous hydrino reaction system design are presented. Heat from the hydrino reactions within individual cells provide both reactor power and the heat for regeneration of the reactants. These processes occur continuously and the power from each cell is constant. The conversion of thermal power to electrical power requires the use of a heat engine exploiting a cycle such as a Rankine, Brayton, Stirling, or steam-engine cycle. Due to the temperatures, economy goal, and efficiency, the Rankine cycle is the most practical and can produce electricity at 30-40% efficiency with a component capital cost of about $300 per kW electric. Conservatively, assuming a conversion efficiency of 25% the total cost with the addition of the boiler and chemical components is estimated at $1064 per kW electric. (author)

  14. Continuous hydrino thermal power system

    International Nuclear Information System (INIS)

    Mills, Randell L.; Zhao, Guibing; Good, William

    2011-01-01

    The specifics of a continuous hydrino reaction system design are presented. Heat from the hydrino reactions within individual cells provide both reactor power and the heat for regeneration of the reactants. These processes occur continuously and the power from each cell is constant. The conversion of thermal power to electrical power requires the use of a heat engine exploiting a cycle such as a Rankine, Brayton, Stirling, or steam-engine cycle. Due to the temperatures, economy goal, and efficiency, the Rankine cycle is the most practical and can produce electricity at 30-40% efficiency with a component capital cost of about $300 per kW electric. Conservatively, assuming a conversion efficiency of 25% the total cost with the addition of the boiler and chemical components is estimated at $1064 per kW electric.

  15. Solar power satellite life-cycle energy recovery consideration

    Science.gov (United States)

    Weingartner, S.; Blumenberg, J.

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead on monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on earth (rectenna) requires about 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production installation and operation, is about two years.

  16. Solar power satellite—Life-cycle energy recovery considerations

    Science.gov (United States)

    Weingartner, S.; Blumenberg, J.

    1995-05-01

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for a cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead of monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power plant components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on Earth (rectenna) requires in the order of 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production, installation and operation, is in the order of two years.

  17. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  18. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapters 2-13, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  19. Power budget analysis of image-plane storage in spectral hole-burning materials

    International Nuclear Information System (INIS)

    Neifeld, M.A.; Randall Babbitt, W.; Krishna Mohan, R.; Craig, A.E.

    2004-01-01

    We analyze the power requirements of a volumetric storage system based on hole-burning materials. We consider an image-plane architecture that uses ultra-fine wavelength addressing. We perform an optimization study in which hole-depth, material thickness, and spot size are selected to minimize the system power budget. We find that a data rate of 10 Gbps and a latency of 10 μs can be achieved in a read-once system based on Eu-YSO with a total power budget of only 23 mW. The same material system designed to tolerate 1000 read cycles would require only a factor of 15 increase in power

  20. Total energy consumption in Finland increased by one percent

    International Nuclear Information System (INIS)

    Timonen, L.

    2000-01-01

    The total energy consumption in Finland increased by less than a percent in 1999. The total energy consumption in 1999 was 1310 PJ corresponding to about 31 million toe. The electric power consumption increased moderately by 1.6%, which is less than the growth of the gross national product (3.5%). The final consumption of energy grew even less, only by 0.5%. Import of electric power increased by 19% in 1999. The import of electric power was due to the availability of low-priced electric power on the Nordic electricity markets. Nuclear power generation increased by 5% and the consumption of wood-based fuels by 3%. The increment of the nuclear power generation increased because of the increased output capacity and good operability of the power plants. Wind power production doubles, but the share of it in the total energy consumption is only about 0.01%. The peat consumption decreased by 12% and the consumption of hydroelectric power by 15%. The decrease in production of hydroelectric power was compensated by an increase import of electric power. The consumption of fossil fuels, coal, oil and natural gas remained nearly the same as in 1998. The gasoline consumption, however, decreased, but the consumption of diesel oil increased due to the increased road transport. The share of the fossil fuels was nearly half of the total energy consumption. The consumption of renewable energy sources remained nearly the same, in 23% if the share of peat is excluded, and in 30% if the share of peat is included. Wood-based fuels are the most significant type of renewable fuels. The share of them in 1999 was over 80% of the total usage of the renewable energy sources. The carbon dioxide emissions in Finland decreased in 1999 by 1.0 million tons. The total carbon dioxide emissions were 56 million tons. The decrease was mainly due to the decrease of the peat consumption. The final consumption of energy increased by 0.5%, being hence about 1019 PJ. Industry is the main consumer of energy

  1. Analysis of station blackout accident at the nuclear power plant; Analiza gubitka svih izmjenichnih izvora napajanja u NE

    Energy Technology Data Exchange (ETDEWEB)

    Bencik, V [Elektrotehnichki Inst. Rade Koncar, Zagreb (Yugoslavia); Kozaric, M [Zagreb Univ. (Yugoslavia). Elektrotehnicki Fakultet

    1990-07-01

    In 1986 the US NRC published a proposed rule making to tighten the requirements on nuclear plants with regard to their ability to deal safely with a total loss of all a-c electric power, both from external and internal sources of supply. The proposed rule would require all licensees and applicants to: 1. Assess the capability of their plants to cope with a total loss all a-c power(that is, determine the amount of time the plant could maintain core cooling and containment integrity with a-c power unavailable); 2. Have procedures and training to cope with such an event; 3. Make modification, if necessary, to cope with an acceptable minimum duration loss of all a-c power. A total loss of all a-c electric power has been identified as an 'unresolved safety issue' and subjected to considerably study. The article presents an idea to resolve this issue. (author)

  2. Safety related requirements on future nuclear power plants

    International Nuclear Information System (INIS)

    Niehaus, F.

    1991-01-01

    Nuclear power has the potential to significantly contribute to the future energy supply. However, this requires continuous improvements in nuclear safety. Technological advancements and implementation of safety culture will achieve a safety level for future reactors of the present generation of a probability of core-melt of less than 10 -5 per year, and less than 10 -6 per year for large releases of radioactive materials. There are older reactors which do not comply with present safety thinking. The paper reviews findings of a recent design review of WWER 440/230 plants. Advanced evolutionary designs might be capable of reducing the probability of significant off-site releases to less than 10 -7 per year. For such reactors there are inherent limitations to increase safety further due to the human element, complexity of design and capability of the containment function. Therefore, revolutionary designs are being explored with the aim of eliminating the potential for off-site releases. In this context it seems to be advisable to explore concepts where the ultimate safety barrier is the fuel itself. (orig.) [de

  3. Total-system expertise in economically efficient operation of nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    Siemens Nuclear Power GmbH can look back on well over 40 years of experience in developing and constructing nuclear power plants. 23 Power plant units of Siemens design are in operation in five countries, and in autumn this year, another one will start commercial operation, while yet another one is under construction. In comparative international power plant surveys, the Siemens-design systems usually rank in top positions when it comes to comparing systems availability and electric power generation, and Siemens have build a reputation in manufacturing power plants up to the highest safety standards worldwide. Our experience as a manufacturer of turnkey PWR and BWR type reactors, as well as our profound knowledge of international nuclear standardisation, engineering codes and safety guides, has been used and processed to the benefit of the services offered by Siemens, resulting in well-devised service packages, and enhancements and optimisation of our machinery and equipment. Siemens has of course obtained the relevant licenses and certification for all its services and products according to DIN ISO 9001, KTA and ASME standards [de

  4. Safety requirement of the nuclear power plants, after TMI-2 accident and their possible implementation on Bushehr NPP

    International Nuclear Information System (INIS)

    Mirhabibi, N.; Tochai, M.T.M.; Ashrafi, A.; Farnoudi, E.

    1985-01-01

    Based on the lessons learned from the TMI-2 accident and other research and developments, many improvements have been required for the design, manufacturing and operation of nuclear power plants in recent years. These requirements have already been implemented to the plants in operation and considered as new safety requirements for new plants. In the present paper these requirements and their possible implementation on Bushehr NPP are discussed. (Author)

  5. Adaptive co-channel interference cancelation for power-limited applications

    KAUST Repository

    Radaydeh, Redha Mahmoud Mesleh; Alouini, Mohamed-Slim

    2010-01-01

    as necessary to maintain the residual total interference instantaneous power within a tolerable range, which can be set to guarantee a target performance level. The mode of operation does not require perfect knowledge of the statistical ordering of interfering

  6. Direction for the Estimation of Required Resources for Nuclear Power Plant Decommissioning based on BIM via Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu [Korea Institute of Construction Technology, Goyang (Korea, Republic of); Kim, Woojung [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. As demands on efficient management and use of complicated construction information increased these days, demands on the introduction of Building Information Modeling (herein after referred to as BIM) technology has increased. In the area of quotation, considerable effects are expected as to the accuracy and reliability predicting construction costs through the characteristics that can automatically estimate quantities by using attribute information of BIM model. BIM-based estimation and quotation of required resources is more accurate than the existing 2D-based quotations and have many advantages such as reviews over constructability and interference. It can be desirable to estimate decommissioning required resources in nuclear power plants using BIM as well as using tools that are compatible with usual international/industrial standards. As we looked into the cases where required resources were estimated, using BIM in Korea and abroad, they dealt with estimation of required resources, estimation of construction cost and process management at large. In each area, methodologies, classification systems, BIM, and realization tests have been used variably. Nonetheless, several problems have been reported, and among them, it is noticeable that although BIM standard classification system exists, no case was found that has used standard classification system. This means that no interlink among OBS (Object Breakdown Structure), WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) was possible. Thus, for nuclear power plant decommissioning, decommissioning method and process, etc. shall be defined clearly in the stage of decommissioning strategy establishment, so that classification systems must be set up

  7. Direction for the Estimation of Required Resources for Nuclear Power Plant Decommissioning based on BIM via Case Study

    International Nuclear Information System (INIS)

    Jung, Insu; Kim, Woojung

    2014-01-01

    Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. As demands on efficient management and use of complicated construction information increased these days, demands on the introduction of Building Information Modeling (herein after referred to as BIM) technology has increased. In the area of quotation, considerable effects are expected as to the accuracy and reliability predicting construction costs through the characteristics that can automatically estimate quantities by using attribute information of BIM model. BIM-based estimation and quotation of required resources is more accurate than the existing 2D-based quotations and have many advantages such as reviews over constructability and interference. It can be desirable to estimate decommissioning required resources in nuclear power plants using BIM as well as using tools that are compatible with usual international/industrial standards. As we looked into the cases where required resources were estimated, using BIM in Korea and abroad, they dealt with estimation of required resources, estimation of construction cost and process management at large. In each area, methodologies, classification systems, BIM, and realization tests have been used variably. Nonetheless, several problems have been reported, and among them, it is noticeable that although BIM standard classification system exists, no case was found that has used standard classification system. This means that no interlink among OBS (Object Breakdown Structure), WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) was possible. Thus, for nuclear power plant decommissioning, decommissioning method and process, etc. shall be defined clearly in the stage of decommissioning strategy establishment, so that classification systems must be set up

  8. Centralized vs decentralized lunar power system study

    Science.gov (United States)

    Metcalf, Kenneth; Harty, Richard B.; Perronne, Gerald E.

    1991-09-01

    Three power-system options are considered with respect to utilization on a lunar base: the fully centralized option, the fully decentralized option, and a hybrid comprising features of the first two options. Power source, power conditioning, and power transmission are considered separately, and each architecture option is examined with ac and dc distribution, high and low voltage transmission, and buried and suspended cables. Assessments are made on the basis of mass, technological complexity, cost, reliability, and installation complexity, however, a preferred power-system architecture is not proposed. Preferred options include transmission based on ac, transmission voltages of 2000-7000 V with buried high-voltage lines and suspended low-voltage lines. Assessments of the total cost associated with the installations are required to determine the most suitable power system.

  9. Materials availability for fusion power plant construction

    International Nuclear Information System (INIS)

    Hartley, J.N.; Erickson, L.E.; Engel, R.L.; Foley, T.J.

    1976-09-01

    A preliminary assessment was made of the estimated total U.S. material usage with and without fusion power plants as well as the U.S. and foreign reserves and resources, and U.S. production capacity. The potential environmental impacts of fusion power plant material procurement were also reviewed including land alteration and resultant chemical releases. To provide a general measure for the impact of material procurement for fusion reactors, land requirements were estimated for mining and disposing of waste from mining

  10. Energy analysis of nuclear power plants and their fuel cycle

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    Energy analysis has become an increasingly feasible and practical additional method for evaluating the engineering, economic and environmental aspects of power producing systems. Energy analysis compares total direct and indirect energy investment into construction and operation of power plants with their lifetime energy output. Statically we have applied this method to nuclear power producing sytems and their fuel cycles. Results were adapted to countries with various levels of industrialization and resources. With dynamic energy analysis different scenarios have been investigated. For comparison purposes fossil fueled and solar power plants have also been analyzed. By static evaluation it has been shown that for all types of power plants the energy investment for construction is shortly after plant startup being repaid by energy output. Static analyses of nuclear and fossil fuels have indicated values of fuel concentrations below which more energy is required for their utilization than can be obtained from the plants they fuel. In a further step these global results were specifically modified to the economic situations of countries with various levels of industrialization. Also the influence of energy imports upon energy analysis has been discussed. By dynamic energy analyses the cumulative energy requirements for specific power plant construction programs have been compared with their total energy output. Investigations of this sort are extremely valuable not only for economic reasons but especially for their usefulness in showing the advantages and disadvantages of a specific power program with respect to its alternatives. Naturally the impact of these investigations on the fuel requirements is of importance especially because of the today so often cited ''valuable cumulated fossil fuel savings''

  11. Efficient design and simulation of an expandable hybrid (wind-photovoltaic) power system with MPPT and inverter input voltage regulation features in compliance with electric grid requirements

    Energy Technology Data Exchange (ETDEWEB)

    Skretas, Sotirios B.; Papadopoulos, Demetrios P. [Electrical Machines Laboratory, Department of Electrical and Computer Engineering, Democritos University of Thrace (DUTH), 12 V. Sofias, 67100 Xanthi (Greece)

    2009-09-15

    In this paper an efficient design along with modeling and simulation of a transformer-less small-scale centralized DC - bus Grid Connected Hybrid (Wind-PV) power system for supplying electric power to a single phase of a three phase low voltage (LV) strong distribution grid are proposed and presented. The main components of the hybrid system are: a PV generator (PVG); and an array of horizontal-axis, fixed-pitch, small-size, variable-speed wind turbines (WTs) with direct-driven permanent magnet synchronous generator (PMSG) having an embedded uncontrolled bridge rectifier. An overview of the basic theory of such systems along with their modeling and simulation via Simulink/MATLAB software package are presented. An intelligent control method is applied to the proposed configuration to simultaneously achieve three desired goals: to extract maximum power from each hybrid power system component (PVG and WTs); to guarantee DC voltage regulation/stabilization at the input of the inverter; to transfer the total produced electric power to the electric grid, while fulfilling all necessary interconnection requirements. Finally, a practical case study is conducted for the purpose of fully evaluating a possible installation in a city site of Xanthi/Greece, and the practical results of the simulations are presented. (author)

  12. Land Use Requirements of Modern Wind Power Plants in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Denholm, P.; Hand, M.; Jackson, M.; Ong, S.

    2009-08-01

    This report provides data and analysis of the land use associated with modern, large wind power plants (defined as greater than 20 megawatts (MW) and constructed after 2000). The analysis discusses standard land-use metrics as established in the life-cycle assessment literature, and then discusses their applicability to wind power plants. The report identifies two major 'classes' of wind plant land use: 1) direct impact (i.e., disturbed land due to physical infrastructure development), and 2) total area (i.e., land associated with the complete wind plant project). The analysis also provides data for each of these classes, derived from project applications, environmental impact statements, and other sources. It attempts to identify relationships among land use, wind plant configuration, and geography. The analysts evaluated 172 existing or proposed projects, which represents more than 26 GW of capacity. In addition to providing land-use data and summary statistics, they identify several limitations to the existing wind project area data sets, and suggest additional analysis that could aid in evaluating actual land use and impacts associated with deployment of wind energy.

  13. Combining total energy and energy industrial center concepts to increase utilization efficiency of geothermal energy

    Science.gov (United States)

    Bayliss, B. P.

    1974-01-01

    Integrating energy production and energy consumption to produce a total energy system within an energy industrial center which would result in more power production from a given energy source and less pollution of the environment is discussed. Strong governmental support would be required for the crash drilling program necessary to implement these concepts. Cooperation among the federal agencies, power producers, and private industry would be essential in avoiding redundant and fruitless projects, and in exploiting most efficiently our geothermal resources.

  14. New requirements, rules and regulations, and vested rights of nuclear power plants

    International Nuclear Information System (INIS)

    Raetzke, C.

    2006-01-01

    The article deals with the question whether new requirements can be imposed on existing nuclear power plants. It was promoted by the fact that the German Federal Ministry for the Environment currently is working on a thorough revision of German nuclear regulations. When looking at backfitting requirements, the all-important question is whether new findings show that the provisions taken in the license to guarantee the 'necessary precautions' (as defined in the German Atomic Energy Act) contain errors or omissions; only in this case can the authority demand that remedial measures, including backfitting, be taken. Beyond that, German nuclear law contains no obligation for operators to improve and develop safety still further. This applies regardless of whether new requirements are justified by new technical possibilities or new scientific analyses or whether they are prompted by a mere abstract re-evaluation of the safety level to be achieved. In the former case, if there are good technical or scientific reasons, the operators, as a rule, will perform backfitting voluntarily. Pursuant to these criteria, the article covers three categories of backfitting requirements and illustrates them by examples. These general principles are also valid when a new set of regulations - as planned by the BMU - are put into effect and applied. They may lead to existing plants not having to comply fully with the requirements contained in new regulations. (orig.)

  15. Virginia Power's regulatory reduction program

    International Nuclear Information System (INIS)

    Miller, G.D.

    1996-01-01

    Virginia Power has two nuclear plants, North Anna and Surry Power Stations, which have two units each for a total of four nuclear units. In 1992, the Nuclear Regulatory Commission solicited comments from the nuclear industry to obtain their ideas for reducing the regulatory burden on nuclear facilities. Pursuant to the new regulatory climate, Virginia Power developed an internal program to evaluate and assess the regulatory and self-imposed requirements to which they were committed, and to pursue regulatory relief or internal changes where possible and appropriate. The criteria were that public safety must be maintained, and savings must be significant. Up to the date of the conference, over US$22 million of one-time saving had been effected, and US$2.75 million in annual savings

  16. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  17. New safety standards of nuclear power station with no requirements of site evaluation. No public dose limit published with possible inappropriateness of reactor site

    International Nuclear Information System (INIS)

    Takitani, Koichi

    2013-01-01

    Nuclear Regulation Authority was preparing new safety standards in order to aim at starting safety reviews of existing nuclear power station in July 2013. This article commented on issues of major accident, which was defined as severely damaged core event. Accumulated dose at the site boundary of the Fukushima Daiichi Nuclear Power Station totaled to about 234 mSv on March just after the accident with rare gas of 500 PBq, iodine 131 of 500 PBq, cesium 134 of 10 PBq and cesium 137 of 10 PBq released to the atmosphere, which was beyond 100 mSv. As measures for preventing containment vessel failure after core severely damaged, filtered venting system was required to be installed for low radiological risk to the public. However filter was not effective to rare gas. Accumulated doses at the site boundary of several nuclear power stations after filtered venting with 100% release of rare gas could be estimated to be 2-37 Sv mostly depending on the site condition, which might be surely greater than 100 mSv. Omitting site evaluation for major accident, which was beyond design basis accident, was great concern. (T. Tanaka)

  18. Thermal power plant operating regimes in future British power systems with increasing variable renewable penetration

    International Nuclear Information System (INIS)

    Edmunds, Ray; Davies, Lloyd; Deane, Paul; Pourkashanian, Mohamed

    2015-01-01

    Highlights: • This work investigates thermal power operating regimes in future power systems. • Gas plants have low utilisation in the scenarios considered. • Ramping intensity increases for gas plants and pumped storage. • Coal plants frequently operate at minimum stable levels and start-ups increase. • Grid emission intensity and total emission production remains substantial. - Abstract: This work investigates the operational requirements of thermal power plants in a number of potential future British power systems with increasing variable renewable penetration. The PLEXOS Integrated Energy Model has been used to develop the market models, with PLEXOS employing mixed integer programming to solve the unit commitment and economic dispatch problem, subject to a number of constraints. Initially, a model of the British power system was developed and validated. Subsequently, a 2020 test model was developed to analyse a number of future system structures with differing fuel and carbon prices and generation mixes. The study has found that in three of the four scenarios considered, the utilisation of gas power plants will be relatively low, but remains fundamental to the security of supply. Also, gas plants will be subject to more intense ramping. The findings have consequent implications for energy policy as expensive government interventions may be required to prevent early decommissioning of gas capacity, should the prevailing market conditions not guarantee revenue adequacy.

  19. EXCESS RF POWER REQUIRED FOR RF CONTROL OF THE SPALLATION NEUTRON SOURCE (SNS) LINAC, A PULSED HIGH-INTENSITY SUPERCONDUCTING PROTON ACCELERATOR

    International Nuclear Information System (INIS)

    Lynch, M.; Kwon, S.

    2001-01-01

    A high-intensity proton linac, such as that being planned for the SNS, requires accurate RF control of cavity fields for the entire pulse in order to avoid beam spill. The current design requirement for the SNS is RF field stability within ±0.5% and ±0.5 o [1]. This RF control capability is achieved by the control electronics using the excess RF power to correct disturbances. To minimize the initial capital costs, the RF system is designed with 'just enough' RF power. All the usual disturbances exist, such as beam noise, klystron/HVPS noise, coupler imperfections, transport losses, turn-on and turn-off transients, etc. As a superconducting linac, there are added disturbances of large magnitude, including Lorentz detuning and microphonics. The effects of these disturbances and the power required to correct them are estimated, and the result shows that the highest power systems in the SNS have just enough margin, with little or no excess margin

  20. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  1. Evaluation of the applicability of existing nuclear power plant regulatory requirements in the U.S. to advanced small modular reactors.

    Energy Technology Data Exchange (ETDEWEB)

    LaChance, Jeffrey L.; Wheeler, Timothy A.; Farnum, Cathy Ottinger; Middleton, Bobby D.; Jordan, Sabina Erteza; Duran, Felicia Angelica; Baum, Gregory A.

    2013-05-01

    The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of management and operations. By optimizing the system, the goal is to make these power plants safer, cheaper to operate and maintain, and more secure. In particular, the reduction in plant staffing can result in significant cost savings. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Similarly, certain security staffing requirements for traditional operational nuclear power plants may not be appropriate or necessary for SMRs due to the simpler, safer and more automated design characteristics of SMRs. As a first step in a process to identify where regulatory requirements may be met with reduced staffing and therefore lower cost, this report identifies the regulatory requirements and associated guidance utilized in the licensing of existing reactors. The potential applicability of these regulations to advanced SMR designs is identified taking into account the unique features of these types of reactors.

  2. Silicon Nanowire/Polymer Hybrid Solar Cell-Supercapacitor: A Self-Charging Power Unit with a Total Efficiency of 10.5.

    Science.gov (United States)

    Liu, Ruiyuan; Wang, Jie; Sun, Teng; Wang, Mingjun; Wu, Changsheng; Zou, Haiyang; Song, Tao; Zhang, Xiaohong; Lee, Shuit-Tong; Wang, Zhong Lin; Sun, Baoquan

    2017-07-12

    An integrated self-charging power unit, combining a hybrid silicon nanowire/polymer heterojunction solar cell with a polypyrrole-based supercapacitor, has been demonstrated to simultaneously harvest solar energy and store it. By efficiency enhancement of the hybrid nanowire solar cells and a dual-functional titanium film serving as conjunct electrode of the solar cell and supercapacitor, the integrated system is able to yield a total photoelectric conversion to storage efficiency of 10.5%, which is the record value in all the integrated solar energy conversion and storage system. This system may not only serve as a buffer that diminishes the solar power fluctuations from light intensity, but also pave its way toward cost-effective high efficiency self-charging power unit. Finally, an integrated device based on ultrathin Si substrate is demonstrated to expand its feasibility and potential application in flexible energy conversion and storage devices.

  3. Cost Savings of Nuclear Power with Total Fuel Reprocessing

    International Nuclear Information System (INIS)

    Solbrig, Charles W.; Benedict, Robert W.

    2006-01-01

    The cost of fast reactor (FR) generated electricity with pyro-processing is estimated in this article. It compares favorably with other forms of energy and is shown to be less than that produced by light water reactors (LWR's). FR's use all the energy in natural uranium whereas LWR's utilize only 0.7% of it. Because of high radioactivity, pyro-processing is not open to weapon material diversion. This technology is ready now. Nuclear power has the same advantage as coal power in that it is not dependent upon a scarce foreign fuel and has the significant additional advantage of not contributing to global warming or air pollution. A jump start on new nuclear plants could rapidly allow electric furnaces to replace home heating oil furnaces and utilize high capacity batteries for hybrid automobiles: both would reduce US reliance on oil. If these were fast reactors fueled by reprocessed fuel, the spent fuel storage problem could also be solved. Costs are derived from assumptions on the LWR's and FR's five cost components: 1) Capital costs: LWR plants cost $106/MWe. FR's cost 25% more. Forty year amortization is used. 2) The annual O and M costs for both plants are 9% of the Capital Costs. 3) LWR fuel costs about 0.0035 $/kWh. Producing FR fuel from spent fuel by pyro-processing must be done in highly shielded hot cells which is costly. However, the five foot thick concrete walls have the advantage of prohibiting diversion. LWR spent fuel must be used as feedstock for the FR initial core load and first two reloads so this FR fuel costs more than LWR fuel. FR fuel costs much less for subsequent core reloads ( 6 /MWe. The annual cost for a 40 year licensed plant would be 2.5 % of this or less if interest is taken into account. All plants will eventually have to replace those components which become radiation damaged. FR's should be designed to replace parts rather than decommission. The LWR costs are estimated to be 2.65 cents/kWh. FR costs are 2.99 cents/kWh for the first

  4. Fire protection requirements of the insurance industry and their impact on nuclear power plant design and construction

    International Nuclear Information System (INIS)

    Deitchman, J.V.; King, W.T. Jr.; Nashman, T.A.

    1976-01-01

    The insurance industry, with its wealth of knowledge and experience in the fire protection area and with preservation of its funds at stake, has always been heavily involved in the fire protection programs of nuclear power plants. Since it was concerned with property preservation in addition to nuclear safety, the insurance industry placed more detailed emphasis on fire protection requirements than did the nuclear regulatory bodies. Since the Browns Ferry fire, however, the insurance industry, the Nuclear Regulatory Commission, the Advisory Committee on Reactor Safeguards and the utilities themselves have re-examined their approaches to fire protection. A more coordinated approach seems to have emerged, which is based largely upon insurance industry specifications and guidelines. The paper briefly summarizes the fire protection requirements of the insurance industry as they apply to nuclear power plants. Some of the ways these requirements affect project planning, plant design, and construction timing are reviewed, as well as some of the more controversial fire protection areas

  5. Power program and nuclear power

    International Nuclear Information System (INIS)

    Chernilin, Yu.F.

    1990-01-01

    Main points of the USSR power program and the role of nuclear power in fuel and power complex of the country are considered. Data on dynamics of economic indices of electric power generation at nuclear power plants during 1980-1988 and forecasts till 2000 are presented. It is shown that real cost of 1 kW/h of electric power is equal to 1.3-1.8 cop., and total reduced cost is equal to 1.8-2.4 cop

  6. Licensing evaluation of CANDU-PHW nuclear power plants relative to U.S. regulatory requirements

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1978-01-01

    Differences between the U.S. and Canadian approach to safety and licensing are discussed. U.S. regulatory requirements are evaluated as regards their applicability to CANDU-PHW reactors; vice-versa the CANDU-PHW reactor is evaluated with respect to current Regulatory Requirements and Guides. A number of design modifications are proposed to be incorporated into the CANDU-PHW reactor in order to facilitate its introduction into the U.S. These modifications are proposed solely for the purpose of maintaining consistency within the current U.S. regulatory system and not out of a need to improve the safety of current-design CANDU-PHW nuclear power plants. A number of issues are identified which still require resolution. Most of these issues are concerned with design areas not (yet) covered by the ASME code. (author)

  7. Design considerations of a total energy power system for a rural health centre in Nigeria

    Energy Technology Data Exchange (ETDEWEB)

    Chendo, M A.C. [Lagos Univ. (NG). Dept. of Physics; Salawu, R I [Lagos Univ. (NG). Dept. of Electrical Engineering

    1989-01-01

    A conceptual total energy (hybrid) system design considerations are presented for a Rural Health Centre in a remote village in Nigeria. The design uses a spectrally selective beam splitting technique. The system provides both electrical and thermal energy with electrical needs of the centre being provided by the photoquantum convertor while the hot water and sterilization requirements are met by the spectrally selective heat transfer liquid in the thermally decoupled loop. A critical analysis of the electrical and thermal energy requirements of the health centre including its laboratories, water supply, refrigeration, lighting, etc. and its technoeconomic aspects is also discussed. With appropriate sizing of panels, storage, choice of the spectrally selective heat transfer liquid and other accessories, the PV/PT system using moderately concentrated sunlight is attractive for such application in areas with no national grid lines and normally considered uneconomical for electrification by the extension of the national grid or by the provision of generators which require constant supply of fuel and servicing. (author).

  8. Thermodynamic and economic analysis on geothermal integrated combined-cycle power plants

    International Nuclear Information System (INIS)

    Bettocchi, R.; Cantore, G.; Negri di Montenegro, G.; Gadda, E.

    1992-01-01

    This paper considers geothermal integrated power plants obtained matching a geothermal plant with, a two pressure level combined plant. The purpose of the paper is the evaluation of thermodynamic and economic aspects on geothermal integrated combined-cycle power plant and a comparison with conventional solutions. The results show that the integrated combined plant power is greater than the sum of combined cycle and geothermal plant powers considered separately and that the integrated plant can offer economic benefits reaching the 16% of the total capital required

  9. Circulating water pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Satoh, Hiroshi; Ohmori, Tsuneaki

    1979-01-01

    Shortly, the nuclear power station with unit power output of 1100 MW will begin the operation, and the circulating water pumps manufactured recently are those of 2.4 to 4 m bore, 840 to 2170 m 3 /min discharge and 2100 to 5100 kW driving power. The circulating water pumps are one of important auxiliary machines, because if they fail, power generation capacity lowers immediately. Enormous quantity of cooling water is required to cool condensers, therefore in Japan, sea water is usually used. As siphon is formed in circulating water pipes, the total head of the pumps is not very high. The discharge of the pumps is determined so as to keep the temperature rise of discharged water lower than 7 deg. C. The quantity of cooling water for nuclear power generation is about 50% more as compared with thermal power generation because of the difference in steam conditions. The total head of the pumps is normally from 8 to 15 m. The circulating water pumps rarely stop after they started the operation, therefore it is economical to determine the motor power so that it can withstand 10% overload for a short period, instead of large power. At present, vertical shaft, oblique flow circulating water pumps are usually employed. Recently, movable blade pumps are adopted. The installation, construction and materials of the pumps and the problems are described. (Kako, I.)

  10. A PLC generic requirements and specification for safety-related applications in nuclear power plants

    International Nuclear Information System (INIS)

    Han, Jea Bok; Lee, C. K.; Lee, D. Y.

    2001-12-01

    This report presents the requirements and specification to be applied to the generic qualification of programmable Logic Controller(PLC), which is being developed as part of the KNICS project, 'Development of the Digital Reactor Safety Systems' of which purpose is the application to safety-related instrumentation and control systems in nuclear power plants. This report defines the essential and critical characteristics that shall be included as part of a PLC design for safety-related application. The characteristics include performance, reliability, accuracy, the overall response time from an input to the PLC exceeding it trip condition to the resulting outputs, and the specification of processors and memories in digital controller. It also specifies the quality assurance process for software development, dealing with executive software, firmware, application software tools for developing the application software, and human machine interface(HMI). In addition, this report reviews the published standards and guidelines that are required for the PLC development and the quality assurance processes such as environment requirements, seismic withstand requirements, EMI/RFI withstand requirements, and isolation test

  11. Survey on maintenance skills required for nuclear power plant periodic inspections

    International Nuclear Information System (INIS)

    Hamasaki, Kenichi

    2008-01-01

    In this study, we conducted a trend survey regarding the problem of passing on senior workers' skills and knowledge to young employees in industries in general, and an interview survey of skilled workers engaged in maintenance work during periodic inspections at a nuclear power plant. These surveys aimed to obtain useful information for maintaining and improving the quality of future maintenance work during nuclear power plant periodic inspections. The trend survey of industries found that the 'Year 2007 Problem (difficulties associated with the start of mass retirements of baby-boomers)' was often takenup in various fields and that many companies were concerned about losing their accumulated skills and know-how. To ensure that skills are smoothly passed on to the younger generation, companies have taken various measures, such as development of plans for passing on skills and knowledge, introduction of the Meister system and implementation of workshops by skilled workers. The interview survey of skilled workers engaged in maintenance work of mechanical equipment during periodic inspections at Nuclear Power Plant A found that various skills were required in maintenance work. Regarding perceived differences between skilled and unskilled maintenance workers, many respondents believed that the largest difference was in terms of time taken to carry out specific procedures. Some maintenance companies have increasingly fewer skilled workers than before or face aging of skilled personnel. As future concerns, respondents cited the loss of skills that have been acquired through experience in construction and in handling of troubles and failures. Differences were observed among companies in the degree to which skills have been passed on to the younger generation. As a reason why skills are not successfully passed on, respondents cited communication problems due to age differences between senior and young workers and other problems that were also observed in other industries

  12. How Many Model Evaluations Are Required To Predict The AEP Of A Wind Power Plant?

    DEFF Research Database (Denmark)

    Murcia Leon, Juan Pablo; Réthoré, Pierre-Elouan; Natarajan, Anand

    2015-01-01

    (AEP) predictions expensive. The objective of the present paper is to minimize the number of model evaluations required to capture the wind power plant's AEP using stationary wind farm flow models. Polynomial chaos techniques are proposed based on arbitrary Weibull distributed wind speed and Von Misses...... distributed wind direction. The correlation between wind direction and wind speed are captured by defining Weibull-parameters as functions of wind direction. In order to evaluate the accuracy of these methods the expectation and variance of the wind farm power distributions are compared against...... the traditional binning method with trapezoidal and Simpson's integration rules. The wind farm flow model used in this study is the semi-empirical wake model developed by Larsen [1]. Three test cases are studied: a single turbine, a simple and a real offshore wind power plant. A reduced number of model...

  13. Control of Power and Voltage of Solar Grid Connected

    OpenAIRE

    Allah, Boucetta Abd; Djamel, Labed

    2016-01-01

    Renewable energy is high on International agendas. Currently, grid-connected photovoltaic systems are a popular technology to convert solar energy into electricity. Control of power injected into the grid, maximum power point, high efficiency, and low total harmonic distortion of the currents injected into the grid are the requirements for inverter connection into the grid. Consequently, the performance of the inverters connected to the grid depends largely on the control strategy applied. In...

  14. Design of a requirements system for decommissioning of a nuclear power plant based on systems engineering

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hee Seong; Park, Seung Kook; Jin, Hyung Gon; Song, Chan Ho; Choi, Jong won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The nuclear industry has required an advanced system that can manage decommissioning information ever since the Korean government decide to decommission the Gori No.1 nuclear power plant. The D and D division at KAERI has been developing a system that can secure the reliability and sustainability of the decommissioning project based on the engineering system of the KRR-2 (Korean Research Reactor-2). To establish a decommissioning information system, a WBS that needs to be managed for the decommissioning of an NPP has been extracted, and requirements management research composed of system engineering technology has progressed. This paper propose a new type of system based on systems engineering technology. Even though a decommissioning engineering system was developed through the KRR-2, we are now developing an advanced decommissioning information system because it is not easy to apply this system to a commercial nuclear power plant. An NPP decommissioning is a project requiring a high degree of safety and economic feasibility. Therefore, we have to use a systematic project management at the initial phase of the decommissioning. An advanced system can manage the decommissioning information from preparation to remediation by applying a previous system to the systems engineering technology that has been widely used in large-scale government projects. The first phase of the system has progressed the requirements needed for a decommissioning project for a full life cycle. The defined requirements will be used in various types of documents during the decommissioning preparation phase.

  15. Congestion management by determining optimal location of TCSC in deregulated power systems

    International Nuclear Information System (INIS)

    Besharat, Hadi; Taher, Seyed Abbas

    2008-01-01

    In a deregulated electricity market, it may always not be possible to dispatch all of the contracted power transactions due to congestion of the transmission corridors. The ongoing power system restructuring requires an opening of unused potentials of transmission system due to environmental, right-of-way and cost problems which are major hurdles for power transmission network expansion. Flexible AC transmission systems (FACTSs) devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flows in the network. A method to determine the optimal location of thyristor controlled series compensators (TCSCs) has been suggested in this paper based on real power performance index and reduction of total system VAR power losses. (author)

  16. Siemens IT solutions for power sector

    International Nuclear Information System (INIS)

    Lunter, P.

    2004-01-01

    The cost reduction, flexibility and revenue increase, potential exploitation, productivity increase, and business opportunities exploitation - that is all what can be required in the races for the promonent positioning on the electricity power market. These requirements can be realized by the sophisticated IT solutions hand-tailored to the special requirements of the electric power producers and tradesmen. This approach makes it possible to achieve greater profit. Our solutions 'PROFIT Solutions', that are symbiosis of the most progressive information technologies and the power plant techniques of the company Siemens, satisfy submitted specifications in substantial measure. The system solutions 'PROFIT Solutions' comprise three solution groups: process, operation a business. The solutions of the group 'IT Process Solutions' increase flexibility and manoeuvrability of equipment, improve the efficiency and contribute to more economical operation of the power generation. Solutions 'IT Process Solutions' simplify and shorten the period of power cycles and conduce to higher labour productivity. Solutions group 'IT Process Solutions' approaches equipment to the market - supports the profit strategies, helps quickly and expertly to determine and predict hazards. The extension PROFIT Cockpit means the nuance to the solutions world 'PROFIT Solutions'. The survey about the whole installation is within reach at the simple touch of a button. It is possible to compile the total system part by part from single solutions 'PROFIT Solutions'. As a matter of fact all single parts can be interconnected with already existing solutions. Routines 'PROFIT Solutions' cooperate with all modern control systems. (author)

  17. Institutional innovations required for widespread use of nuclear power

    International Nuclear Information System (INIS)

    Johnson, W.R.

    1992-01-01

    The social and economic benefits of additional electrical generating capacity in lesser developed countries are unquestioned, and a case can be made from economic and environmental considerations that much of this capacity should be nuclear powered. Obstacles to the introduction of nuclear power in the developing world include lack of a technical infrastructure and capital cost. Manpower shortage also detracts from a country's ability to effectively regulate a nuclear power enterprise. Two variations on the traditional institutional methods for supplying and regulating nuclear electric power are proposed. The first would be independent international companies that would design, finance, build, operate and maintain nuclear power stations, and sell electricity to local systems. The second would be an international safety regulatory system that could offer uniform, effective regulations and enforcement of the entire nuclear power enterprise at a level consistent with accepted world standards. These proposals coupled with the modular Advanced Liquid Metal Reactor based on Integral Fast Reactor technology would make possible a safe, economically feasible nuclear power operation that could be located anywhere in the world. (author). 7 refs

  18. Impacts of Renewable Energy Quota System on China's Future Power Sector

    OpenAIRE

    Xiong, Weiming; Zhang, Da; Mischke, Peggy; Zhang, Xiliang

    2014-01-01

    As the biggest carbon emitting sector which produces 44% of current national carbon emission in China, the coal-dominated power sector has a tremendous potential for CO2 mitigation in the next two decades. Renewable energy quota system is currently discussed as a potential future policy instrument for the power sector, which requires certain fraction of renewable energy in total power generation for each province and grid zone. The quantitative studies on renewable energy quota for China are ...

  19. Power requirements at the VHTR/HTE interface for hydrogen production

    International Nuclear Information System (INIS)

    Vilim, R.B.

    2007-01-01

    The power requirements at the interface between the High Temperature Electrolysis (HTE) process and the Very High Temperature Reactor (VHTR) were investigated. The study was performed using a network systems code that linked together individual component models for boiler, condenser, turbine, compressor, pump, gas-to-gas heat exchanger, electrolyser, and reactor and properties for water, hydrogen, oxygen, nitrogen, and helium. A species mixture model supported the use of mixtures of gases in each component model. The requirements for a reference design with a dedicated high temperature process heat loop are given. In general the quantity and quality of the process heat needed by the HTE process is a function of how the electrolyser is operated. Operating at higher voltage increases throughput and resistive heating providing the opportunity to recuperate this heat and supplant a large fraction of high temperature reactor heat. Any shortfall can be added by electrical heaters in the HTE plant. Eliminating the associated high temperature heat exchanger from the nuclear plant in this manner would significantly improve safety and maintainability. Low temperature process heat is still needed to vaporize water for the HTE process but this can be obtained at very low cost from VHTR waste heat rejected to the ultimate heat sink. (author)

  20. Maximum power point tracking

    International Nuclear Information System (INIS)

    Enslin, J.H.R.

    1990-01-01

    A well engineered renewable remote energy system, utilizing the principal of Maximum Power Point Tracking can be m ore cost effective, has a higher reliability and can improve the quality of life in remote areas. This paper reports that a high-efficient power electronic converter, for converting the output voltage of a solar panel, or wind generator, to the required DC battery bus voltage has been realized. The converter is controlled to track the maximum power point of the input source under varying input and output parameters. Maximum power point tracking for relative small systems is achieved by maximization of the output current in a battery charging regulator, using an optimized hill-climbing, inexpensive microprocessor based algorithm. Through practical field measurements it is shown that a minimum input source saving of 15% on 3-5 kWh/day systems can easily be achieved. A total cost saving of at least 10-15% on the capital cost of these systems are achievable for relative small rating Remote Area Power Supply systems. The advantages at larger temperature variations and larger power rated systems are much higher. Other advantages include optimal sizing and system monitor and control

  1. Ancillary reactive power service allocation cost in deregulated markets: a methodology

    International Nuclear Information System (INIS)

    Hernandez, J. Horacio Tovar; Jimenez-Guzman, Miguel; Gutierrez-Alcaraz, Guillermo

    2005-01-01

    This paper presents a methodology to allocate reactive power costs in deregulated markets. Reactive power supply service is decomposed into voltage regulation and reactive power spinning reserve. The proposed methodology is based on sensitivities and the postage-stamp method in order to allocate the total costs service among all participants. With the purpose of achieving this goal, the system operator identifies voltage support and/or reactive power requirements, and looks out for suitable providers. One case study is presented here to illustrate the methodology over a simplified southeastern Mexican grid. (Author)

  2. Power system for tokamak fusion experiments. Motor generator with flywheel effect

    International Nuclear Information System (INIS)

    Miyachi, Kengo

    1997-01-01

    JT-60 requires an enormous electric power pulse about 1,300 MVA periodically for its plasma initiation, containment and heating. JT-60 could not receive all electric power from a commercial line for plasma experiment except about 160 MVA because the 275 kV commercial line has some limitations. Therefore JT-60 needs huge electric power sources. The power supply system of JT-60 has 3 motor generators (MG). The total capacity of MG is 1,115 MVA that consists of a toroidal MG (TMG), poloidal MG (PMG) and Heating power supply MG (HMG), and each MG has a huge flywheel effect. For example, TMG has a 4.02 GJ energy yield that consists of 6 disk flywheel. The total weight of flywheel of TMG is 650 ton. This report describes the structure, operating system, and maintenance history of 3 types of MG. (author)

  3. Current status of SMPRs and manpower development for nuclear power

    International Nuclear Information System (INIS)

    Dias, M.P.

    1994-01-01

    The development of SMPRs could make it possible for countries with small electrical grids to use nuclear power. SMPRs are still in the developing stages and none of them have the capability of good plant performance. Most of the SMPRs are in the 300 MWe range and a grid capacity of at least 2000 MWe would be required before such a power plant can be connected to the grid. There is a possibility that SMPRs could generate electricity cheaper coal plants requiring desulphurization. An unexpected increase in coal price and adverse environmental effects could make it necessary to use nuclear power in the future. Qualified manpower is required to plan, build and properly operate a nuclear power plant; and the availability of qualified manpower is a pre-condition for deciding to use nuclear power. There is a possibility that Sri Lanka would be able to use nuclear power in the next 15-20 years and a total dependence upon foreign expertise is neither possible nor desirable. Therefore pre-project activities should be considering such things as teaching nuclear science and engineering in the universities and retraining existing professionals, say from the coal power industry. Adequate emphasis must be given to manpower development and to the need to scheduling this development

  4. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Berkeley; Wei, Max; Lipman, Timothy; Mayyas, Ahmad; Chien, Joshua; Chan, Shuk Han; Gosselin, David; Breunig, Hanna; Stadler, Michael; McKone, Thomas; Beattie, Paul; Chong, Patricia; Colella, Whitney; James, Brian

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kW level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.

  5. Real Time In-circuit Condition Monitoring of MOSFET in Power Converters

    Directory of Open Access Journals (Sweden)

    Shakeb A. Khan

    2015-03-01

    Full Text Available Abstract:This paper presents simple and low-cost, real time in-circuit condition monitoring of MOSFET in power electronic converters. Design metrics requirements like low cost, small size, high power factor, low percentage of total harmonic distortion etc. requires the power electronic systems to operate at high frequencies and at high power density. Failures of power converters are attributed largely by aging of power MOSFETs at high switching frequencies. Therefore, real time in-circuit prognostic of MOSFET needs to be done before their selection for power system design. Accelerated aging tests are performed in different circuits to determine the wear out failure of critical components based on their parametric degradation. In this paper, the simple and low-cost test beds are designed for real time in-circuit prognostics of power MOSFETs. The proposed condition monitoring scheme helps in estimating the condition of MOSFETs at their maximum rated operating condition and will aid the system designers to test their reliability and benchmark them before selecting in power converters.

  6. Adaptive co-channel interference cancelation for power-limited applications

    KAUST Repository

    Radaydeh, Redha Mahmoud Mesleh

    2010-09-01

    This paper proposes an adaptive co-channel interference -steering algorithm for highly correlated receive antenna channels with an aim of reducing the power consumption at the receiver. With this algorithm, the receiver activates as many antennas as necessary to maintain the residual total interference instantaneous power within a tolerable range, which can be set to guarantee a target performance level. The mode of operation does not require perfect knowledge of the statistical ordering of interfering signals instantaneous powers, which further reduces the complexity of implementation. It is shown that the arbitrary interference cancelation technique and no cancelation scenario can be studied as limiting cases of the proposed scheme. Analytical expressions for the statistics of the residual total interference instantaneous power are derived, which are then used to obtain results for the average number of active antennas and system outage performance. Numerical studies supported by simulations are presented to clarify the usefulness of the proposed scheme. ©2010 IEEE.

  7. Nuclear power generation

    International Nuclear Information System (INIS)

    Hirao, Katumi; Sato, Akira; Kaimori, Kimihiro; Kumano, Tetsuji

    2001-01-01

    Nuclear power generation for commercial use in Japan has passed 35 years since beginning of operation in the Tokai Nuclear Power Station in 1966, and has 51 machines of reactor and about 44.92 MW of total output of equipment scale in the 21st century. However, an environment around nuclear energy becomes severer at present, and then so many subjects to be overcome are remained such as increased unreliability of the public on nuclear energy at a chance of critical accident of the JCO uranium processing facility, delay of pull-thermal plan, requirement for power generation cost down against liberalization of electric power, highly aging countermeasure of power plant begun its operation as its Genesis, and so on. Under such conditions, in order that nuclear power generation in Japan survives as one of basic electric source in future, it is necessary not only to pursue safety and reliability of the plant reliable to the public, but also to intend to upgrade its operation and maintenance by positively adopting good examples on operational management method on abroad and to endeavor further upgrading of application ratio of equipments and reduction of generation cost. Here were outlined on operation conditions of nuclear power stations in Japan, and introduced on upgrading of their operational management and maintenance management. (G.K.)

  8. A study of thermal-hydraulic requirements for increasing the power rates for natural-circulation boiling water reactors

    International Nuclear Information System (INIS)

    Yasuo, A.; Inada, F.; Hidaka, M.

    1992-01-01

    In this paper, the feasibility of higher power rates for natural-circulation boiling water reactors (BWRs) is studied with the objective of examining the flexibility of the plant power rate in constructing such plants to cope with the increasing demand for electricity. By applying existing one-dimensional design codes, the riser heights necessary to meet two major thermal-hydraulic requirements, i.e., critical power and core stability, are systematically calculated. Several restrictions on the maximum diameter and height of the pressure vessel are also considered because these restrictions could make construction impossible or drastically increase the construction costs. A very simple map of the dominant parameters for higher power rates is obtained. It is concluded that natural-circulation BWRs of >1000 MW (electric) will be feasible within the restrictions considered here

  9. Analysis of Plug Load Capacities and Power Requirements in Commercial Buildings: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Sheppy, M.; Torcellini, P.; Gentile-Polese, L.

    2014-08-01

    Plug and process load power requirements are frequently overestimated because designers often use estimates based on 'nameplate' data, or design assumptions are high because information is not available. This generally results in oversized heating, ventilation, and air-conditioning systems; increased initial construction costs; and increased energy use caused by inefficiencies at low, part-load operation. Rightsizing of chillers in two buildings reduced whole-building energy use by 3%-4%. If an integrated design approach could enable 3% whole-building energy savings in all U.S. office buildings stock, it could save 34 TBtu of site energy per year.

  10. Pratt and Whitney ESCORT derivative for mars surface power

    International Nuclear Information System (INIS)

    Feller, Gerald J.; Joyner, Russell

    1999-01-01

    The purpose of this paper is to address the applicability of a common reactor system design from the Pratt and Whitney ESCORT nuclear thermal rocket engine concept to support current NASA mars surface-based power requirements. The ESCORT is a bimodal engine capable of supporting a wide range of propulsive thermal and vehicle electrical power requirements. The ESCORT engine is powered by a fast-spectrum beryllium-reflected CERMET-fueled nuclear reactor. In addition to an expander cycle propulsive mode, the ESCORT is capable of operating in an electrical power mode. In this mode, the reactor is used to heat a mixture of helium and xenon to drive a closed-loop Brayton cycle in order to generate electrical energy. Recent Design Reference Mission requirements (DRM) from NASA Johnson Space Center and NASA Lewis Research Center studies in 1997 and 1998 have detailed upgraded requirements for potential mars transfer missions. The current NASA DRM requires a nuclear thermal propulsion system capable of delivering total mission requirements of 200170 N (45000 lbf) thrust and 50 kWe of spacecraft electrical power. Additionally, these requirements detailed a surface power system capable of providing approximately 160 kW of electrical energy over an approximate 10 year period within a given weight and volume envelope. Current NASA studies use a SP-100 reactor (0.8 MT) and a NERVA derivative (1.6 MT) as baseline systems. A mobile power cart of approximate dimensions 1.7 mx4.5 mx4.4 m has been conceptualized to transport the reactor power system on the Mars Surface. The 63.25 cm diameter and 80.25 cm height of the ESCORT and its 1.3 MT of weight fit well within the current weight and volume target range of the NASA DRM requirements. The modifications required to the ESCORT reactor system to support this upgraded electrical power requirements along with operation in the Martian atmospheric conditions are addressed in this paper. Sufficient excess reactivity and burnup capability

  11. Estimating Energy Consumption of Mobile Fluid Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Lauren [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zigler, Bradley T. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-02

    This report estimates the market size and energy consumption of mobile off-road applications utilizing hydraulic fluid power, and summarizes technology gaps and implementation barriers. Mobile fluid power is the use of hydraulic fluids under pressure to transmit power in mobile equipment applications. The mobile off-road fluid power sector includes various uses of hydraulic fluid power equipment with fundamentally diverse end-use application and operational requirements, such as a skid steer loader, a wheel loader or an agriculture tractor. The agriculture and construction segments dominate the mobile off-road fluid power market in component unit sales volume. An estimated range of energy consumed by the mobile off-road fluid power sector is 0.36 - 1.8 quads per year, which was 1.3 percent - 6.5 percent of the total energy consumed in 2016 by the transportation sector. Opportunities for efficiency improvements within the fluid power system result from needs to level and reduce the peak system load requirements and develop new technologies to reduce fluid power system level losses, both of which may be facilitated by characterizing duty cycles to define standardized performance test methods. There are currently no commonly accepted standardized test methods for evaluating equipment level efficiency over a duty cycle. The off-road transportation sector currently meets criteria emissions requirements, and there are no efficiency regulations requiring original equipment manufacturers (OEM) to invest in new architecture development to improve the fuel economy of mobile off-road fluid power systems. In addition, the end-user efficiency interests are outweighed by low equipment purchase or lease price concerns, required payback periods, and reliability and durability requirements of new architecture. Current economics, low market volumes with high product diversity, and regulation compliance challenge OEM investment in commercialization of new architecture development.

  12. Total CMB analysis of streaker aerosol samples by PIXE, PIGE, beta- and optical-absorption analyses

    International Nuclear Information System (INIS)

    Annegarn, H.J.; Przybylowicz, W.J.

    1993-01-01

    Multielemental analyses of aerosol samples are widely used in air pollution receptor modelling. Specifically, the chemical mass balance (CMB) model has become a powerful tool in urban air quality studies. Input data required for the CMB includes not only the traditional X-ray fluorescence (and hence PIXE) detected elements, but also total mass, organic and inorganic carbon, and other light elements including Mg, Na and F. The circular streaker sampler, in combination with PIXE analysis, has developed into a powerful tool for obtaining time-resolved, multielemental aerosol data. However, application in CMB modelling has been limited by the absence of total mass and complementary light element data. This study reports on progress in using techniques complementary to PIXE to obtain additional data from circular streaker samples, maintaining the nondestructive, instrumental approach inherent in PIXE: Beta-gauging using a 147 Pm source for total mass; optical absorption for inorganic carbon; and PIGE to measure the lighter elements. (orig.)

  13. Fusion Power measurement at ITER

    Energy Technology Data Exchange (ETDEWEB)

    Bertalot, L.; Barnsley, R.; Krasilnikov, V.; Stott, P.; Suarez, A.; Vayakis, G.; Walsh, M. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-07-01

    Nuclear fusion research aims to provide energy for the future in a sustainable way and the ITER project scope is to demonstrate the feasibility of nuclear fusion energy. ITER is a nuclear experimental reactor based on a large scale fusion plasma (tokamak type) device generating Deuterium - Tritium (DT) fusion reactions with emission of 14 MeV neutrons producing up to 700 MW fusion power. The measurement of fusion power, i.e. total neutron emissivity, will play an important role for achieving ITER goals, in particular the fusion gain factor Q related to the reactor performance. Particular attention is given also to the development of the neutron calibration strategy whose main scope is to achieve the required accuracy of 10% for the measurement of fusion power. Neutron Flux Monitors located in diagnostic ports and inside the vacuum vessel will measure ITER total neutron emissivity, expected to range from 1014 n/s in Deuterium - Deuterium (DD) plasmas up to almost 10{sup 21} n/s in DT plasmas. The neutron detection systems as well all other ITER diagnostics have to withstand high nuclear radiation and electromagnetic fields as well ultrahigh vacuum and thermal loads. (authors)

  14. [Intra-Articular Application of Tranexamic Acid Significantly Reduces Blood Loss and Transfusion Requirement in Primary Total Knee Arthroplasty].

    Science.gov (United States)

    Lošťák, J; Gallo, J; Špička, J; Langová, K

    2016-01-01

    PURPOSE OF THE STUDY The aim of this prospective study was to investigate the effect of topical application of tranexamic acid (TXA, Exacyl) on the amount of post-operative blood loss, and blood transfusion requirement in patients undergoing primary total knee arthroplasty (TKA). Attention was paid to early complications potentially associated with TXA administration, such as haematoma, wound exudate, or knee swelling. In addition, the economic benefit of TXA treatment was also taken into account. MATERIAL AND METHODS The study included 238 patients (85 men and 153 women) who underwent primary total knee arthroplasty (TKA) at our department between January 2013 and November 2015. A group of 119 patients (41 men and 78 women) received intraarticular TXA injections according to the treatment protocol (TXA group). A control group matched in basic characteristics to the TXA group also consisted of 119 patients. The average age in the TXA group was 69.8 years, and the most frequent indication for TKA surgery was primary knee osteoarthritis (81.5%). In each patient, post-operative volume of blood lost from drains and total blood loss including hidden blood loss were recorded, as well as post-operative haemoglobin and haematocrit levels. On discharge of each patient from hospital, the size and site of a haematoma; wound exudate, if present after post-operative day 4; joint swelling; range of motion and early revision surgery, if performed, were evaluated. Requirements of analgesic drugs after surgery were also recorded. RESULTS In the TXA group, blood losses from drains were significantly lower than in the control group (456.7 ± 270.8 vs 640.5 ±448.2; p = 0.004). The median value for blood losses from drains was lower by 22% and the average value for total blood loss, including hidden losses, was also lower than in the control group (762.4 ± 345.2 ml vs 995.5 ± 457.3 ml). The difference in the total amount of blood loss between the two groups was significant (p = 0

  15. Requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work

    International Nuclear Information System (INIS)

    2013-01-01

    The project on the requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work includes contributions on the following topics: the development of the European transmission grid, the grid extension law, restrictions for the power grid and their infrastructure, requirements for the regulations concerning the realization of the transnational grid extension, inclusion of the public - public acceptance - communication, requirements concerning the environmental compensation law, overhead line - underground cable - health hazards, ecological effects of overhead lines and underground cables, infrastructural projects, power supply in the future, structural relief by photovoltaics.

  16. Pay-as-bid based reactive power market

    International Nuclear Information System (INIS)

    Amjady, N.; Rabiee, A.; Shayanfar, H.A.

    2010-01-01

    In energy market clearing, the offers are stacked in increasing order and the offer that intersects demand curve, determines the market clearing price (MCP). In reactive power market, the location of reactive power compensator is so important. A low cost reactive producer may not essentially be favorable if it is far from the consumer. Likewise, a high cost local reactive compensator at a heavily loaded demand center of network could be inevitably an alternative required to produce reactive power to maintain the integrity of power system. Given the background, this paper presents a day-ahead reactive power market based on pay-as-bid (PAB) mechanism. Generators expected payment function (EPF) is used to construct a bidding framework. Then, total payment function (TPF) of generators is used as the objective function of optimal power flow (OPF) problem to clear the PAB based market. The CIGRE-32 bus test system is used to examine the effectiveness of the proposed reactive power market.

  17. Pay-as-bid based reactive power market

    Energy Technology Data Exchange (ETDEWEB)

    Amjady, N. [Department of Electrical Engineering, Semnan University, Semnan (Iran, Islamic Republic of); Rabiee, A., E-mail: Rabiee@iust.ac.i [Center of Excellence for Power System Automation and Operation, Department of Electrical Engineering, Iran University of Science and Technology, Tehran (Iran, Islamic Republic of); Shayanfar, H.A. [Center of Excellence for Power System Automation and Operation, Department of Electrical Engineering, Iran University of Science and Technology, Tehran (Iran, Islamic Republic of)

    2010-02-15

    In energy market clearing, the offers are stacked in increasing order and the offer that intersects demand curve, determines the market clearing price (MCP). In reactive power market, the location of reactive power compensator is so important. A low cost reactive producer may not essentially be favorable if it is far from the consumer. Likewise, a high cost local reactive compensator at a heavily loaded demand center of network could be inevitably an alternative required to produce reactive power to maintain the integrity of power system. Given the background, this paper presents a day-ahead reactive power market based on pay-as-bid (PAB) mechanism. Generators expected payment function (EPF) is used to construct a bidding framework. Then, total payment function (TPF) of generators is used as the objective function of optimal power flow (OPF) problem to clear the PAB based market. The CIGRE-32 bus test system is used to examine the effectiveness of the proposed reactive power market.

  18. Requirements and analysis of electromagnetic compatibility of safety-related instrumentation and control system in nuclear power plants

    International Nuclear Information System (INIS)

    Liu Sujuan

    2002-01-01

    The state-of-the-art instrumentation and control system and the influence of their application to the electromagnetic compatibility is analyzed. Based on the present situation of nuclear safety in China and relevant experiences from other countries, the author tries to probe into the requirements and test methods about how safety-related instrument and control system to accommodate electromagnetic interference, radio-frequency interference and power surges in the environments of nuclear power plant so as to develop Chinese safety standards

  19. The contribution of nuclear energy to the meeting of Italy's electric power requirements

    International Nuclear Information System (INIS)

    Angelini, A.M.

    1977-01-01

    The paper discusses ENEL's policy in the development of nuclear energy, which assigns to this source the role of meeting almost all of Italy's additional future power requirements. This is a position taken some time ago and already outlined on the occasion of the Geneva Conference of 1971. The policy is based on a number of factors, reviewed in the paper, which differentiate, at least in quantitative terms, Italy's situation from that of most industrialized countries. Among these factors stand out the scarcity of natural resources, including energy sources available in Italy. An extensive recourse to nuclear energy is the best way to achieve that diversification of energy supplies vital to the Italian economy which, because of the very lack of natural resources, is predominantly based on processing. While the Caorso Nuclear Power Plant (840 MW) is due to go into service soon, ENEL's nuclear plan, recently approved by the Government, calls for the construction of the four 1,000-MW units already on order and of 16 additional units, of the same size, divided into two 8-units blocks, to be decided on respectively in the very near future and before the end of 1977. The necessary flexibility of the plan concerning the nuclear units that will go into service by the 1986 is ensured by the subdivision into blocks, with provision for the postponement of the second, 8-units block in the country's economy development requires a revision in electric power forecasts. The paper then considers in particular the integration between the nuclear plan and ENEL's extensive plan for pumped-storage hydro-electric power plants and the related technical and economic advantages which also extend to an international scope. The paper concludes the review of Italy's nuclear plan by stressing two essential problems: financing and the availability of sites for nuclear power plants. Upon their timely and satisfactory solution depends the actual construction of the plants by the scheduled dates

  20. Requirements and operation of decentralised power plants in the changing power market

    International Nuclear Information System (INIS)

    Hoenings, Norbert; Hornig, Niels; Steinbach, Sebastian

    2014-01-01

    E.ON plans and realises distributed industrial power plants on the basis of contracting schemes. Target is to reduce energy costs without investment by the customer himself. Gas turbine CHP plants are very flexible and offer many possibilities for the operator to adjust optimally to a constantly changing energy market. This aspect is becoming increasingly important due to the increasing share of renewables. However, the economic situation for CHP plants has deteriorated significantly, due to the current market situation distorted by the subsidised renewable power generation. (orig.)

  1. Method for developing cost estimates for generic regulatory requirements

    International Nuclear Information System (INIS)

    1985-01-01

    The NRC has established a practice of performing regulatory analyses, reflecting costs as well as benefits, of proposed new or revised generic requirements. A method had been developed to assist the NRC in preparing the types of cost estimates required for this purpose and for assigning priorities in the resolution of generic safety issues. The cost of a generic requirement is defined as the net present value of total lifetime cost incurred by the public, industry, and government in implementing the requirement for all affected plants. The method described here is for commercial light-water-reactor power plants. Estimating the cost for a generic requirement involves several steps: (1) identifying the activities that must be carried out to fully implement the requirement, (2) defining the work packages associated with the major activities, (3) identifying the individual elements of cost for each work package, (4) estimating the magnitude of each cost element, (5) aggregating individual plant costs over the plant lifetime, and (6) aggregating all plant costs and generic costs to produce a total, national, present value of lifetime cost for the requirement. The method developed addresses all six steps. In this paper, we discuss on the first three

  2. Lightweight Damage Tolerant, High-Temperature Radiators for Nuclear Power and Propulsion

    Science.gov (United States)

    Craven, Paul D.; SanSoucie, Michael P.

    2015-01-01

    NASA is increasingly emphasizing exploration to bodies beyond near-Earth orbit. New propulsion systems and new spacecraft are being built for these missions. As the target bodies get further out from Earth, high energy density systems, e.g., nuclear fusion, for propulsion and power will be advantageous. The mass and size of these systems, including supporting systems such as the heat exchange system, including thermal radiators, will need to be as small as possible. Conventional heat exchange systems are a significant portion of the total thermal management mass and size. Nuclear electric propulsion (NEP) is a promising option for high-speed, in-space travel due to the high energy density of nuclear fission power sources and efficient electric thrusters. Heat from the reactor is converted to power for use in propulsion or for system power. The heat not used in the power conversion is then radiated to space as shown in figure 1. Advanced power conversion technologies will require high operating temperatures and would benefit from lightweight radiator materials. Radiator performance dictates power output for nuclear electric propulsion systems. Pitch-based carbon fiber materials have the potential to offer significant improvements in operating temperature, thermal conductivity, and mass. These properties combine to allow significant decreases in the total mass of the radiators and significant increases in the operating temperature of the fins. A Center-funded project at NASA Marshall Space Flight Center has shown that high thermal conductivity, woven carbon fiber fins with no matrix material, can be used to dissipate waste heat from NEP systems and because of high specific power (kW/kg), will require less mass and possibly less total area than standard metal and composite radiator fins for radiating the same amount of heat. This project uses an innovative approach to reduce the mass and size required for the thermal radiators to the point that in-space NEP and power

  3. Supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    This standard sets forth the supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel for nuclear power plant construction. The requirements may also be extended to other appropriate parts of nuclear power plants when specified in contract documents. This standard is intended to be used in conjunction with ANSI N45.2

  4. Parametric requirements for noncircular tokamak commercial fusion plants

    International Nuclear Information System (INIS)

    Bourque, R.F.

    1978-05-01

    Systems analyses have been performed in order to determine the parameter ranges for economical operation of equilibrium commercial fusion power plants using noncircular tokamak reactors. The fully-integrated systems code SCOPE was employed in which costs of electricity were used as the critical dependent variable by which the effects of changes in system parameters were observed. The results of these studies show that many of the operating parameters required for economical operation can be considerably relaxed from what has been thought necessary. For example: (1) Neutron wall loadings over about 2 megawatts per square meter are unnecessary for economical tokamak operation; (2) electrical power levels beyond 1000 MW(e) are not required. In fact, power levels as low as 100 MW(e) may be acceptable; (3) total beta values of 10 to 12 percent are adequate for economic operation; (4) duty cycles as low as 50 percent have only a small effect on plant economics; (5) an acceptable first wall lifetime is 15 MW-yr per square meter

  5. Micro Cooling, Heating, and Power (Micro-CHP) and Bio-Fuel Center, Mississippi State University

    Energy Technology Data Exchange (ETDEWEB)

    Louay Chamra

    2008-09-26

    Initially, most micro-CHP systems will likely be designed as constant-power output or base-load systems. This implies that at some point the power requirement will not be met, or that the requirement will be exceeded. Realistically, both cases will occur within a 24-hour period. For example, in the United States, the base electrical load for the average home is approximately 2 kW while the peak electrical demand is slightly over 4 kW. If a 3 kWe micro- CHP system were installed in this situation, part of the time more energy will be provided than could be used and for a portion of the time more energy will be required than could be provided. Jalalzadeh-Azar [6] investigated this situation and presented a comparison of electrical- and thermal-load-following CHP systems. In his investigation he included in a parametric analysis addressing the influence of the subsystem efficiencies on the total primary energy consumption as well as an economic analysis of these systems. He found that an increase in the efficiencies of the on-site power generation and electrical equipment reduced the total monthly import of electricity. A methodology for calculating performance characteristics of different micro-CHP system components will be introduced in this article. Thermodynamic cycles are used to model each individual prime mover. The prime movers modeled in this article are a spark-ignition internal combustion engine (Otto cycle) and a diesel engine (Diesel cycle). Calculations for heat exchanger, absorption chiller, and boiler modeling are also presented. The individual component models are then linked together to calculate total system performance values. Performance characteristics that will be observed for each system include maximum fuel flow rate, total monthly fuel consumption, and system energy (electrical, thermal, and total) efficiencies. Also, whether or not both the required electrical and thermal loads can sufficiently be accounted for within the system

  6. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  7. O Electromagnetic Power Waves and Power Density Components.

    Science.gov (United States)

    Petzold, Donald Wayne

    1980-12-01

    On January 10, 1884 Lord Rayleigh presented a paper entitled "On the Transfer of Energy in the Electromagnetic Field" to the Royal Society of London. This paper had been authored by the late Fellow of Trinity College, Cambridge, Professor J. H. Poynting and in it he claimed that there was a general law for the transfer of electromagnetic energy. He argued that associated with each point in space is a quantity, that has since been called the Poynting vector, that is a measure of the rate of energy flow per unit area. His analysis was concerned with the integration of this power density vector at all points over an enclosing surface of a specific volume. The interpretation of this Poynting vector as a true measure of the local power density was viewed with great skepticism unless the vector was integrated over a closed surface, as the development of the concept required. However, within the last decade or so Shadowitz indicates that a number of prominent authors have argued that the criticism of the interpretation of Poynting's vector as a local power density vector is unjustified. The present paper is not concerned with these arguments but instead is concerned with a decomposition of Poynting's power density vector into two and only two components: one vector which has the same direction as Poynting's vector and which is called the forward power density vector, and another vector, directed opposite to the Poynting vector and called the reverse power density vector. These new local forward and reverse power density vectors will be shown to be dependent upon forward and reverse power wave vectors and these vectors in turn will be related to newly defined forward and reverse components of the electric and magnetic fields. The sum of these forward and reverse power density vectors, which is simply the original Poynting vector, is associated with the total electromagnetic energy traveling past the local point. Another vector which is the difference between the forward

  8. The Requirement for Acquisition and Logistics Integration: An Examination of Reliability Management Within the Marine Corps Acquisition Process

    National Research Council Canada - National Science Library

    Norcross, Marvin

    2002-01-01

    Combat system reliability is central to creating combat power determining logistics supportability requirements and determining systems total ownership costs, yet the Marine Corps typically monitors...

  9. Joint Power Allocation and Beamforming in Amplify-and-Forward Relay Networks under Per-Node Power Constraint

    Directory of Open Access Journals (Sweden)

    Farzin Azami

    2017-01-01

    Full Text Available Two-way relay networks (TWRN have been intensively investigated over the past decade due to their ability to enhance the performance assessment of networks in terms of cellular coverage and spectral efficiency. Yet, power control in such systems is a nontrivial issue, particularly in multirelay networks where relays are deployed to ensure a required Quality of Service (QoS. In this paper, we envision to address this critical issue by minimizing the sum-power with respect to per-node power consumption and acceptable users’ rates. To tackle this, we employ a variable transformation to turn the fractional quadratically constrained quadratic problem (QCQP into semidefinite programming (SDP. This algorithm is also extended to a distributed format. Simulation results of deploying 10 relay stations reveal that the total power consumption will decrease to approximately 8 dBW for 6 bps/Hz sum-rate.

  10. Engineering testing requirements in FED/INTOR

    International Nuclear Information System (INIS)

    Abdou, M.A.; Nygren, R.E.; Morgan, G.D.; Trachsel, C.A.; Wire, G.; Oppermann, E.; Puigh, R.; Gold, R.E.

    1982-10-01

    The FED/INTOR critical issues activity has addressed three key testing requirements that have the largest impact on the design, operation and cost of FED/INTOR. These are: (1) the total testing time (fluence) during the device lifetime, (2) the minimum number of back-to-back cycles, and (3) the neutron wall load (power density in the first wall/blanket). The testing program activities were structured into three tasks in order to define the benefits, and in some cases, costs and risks of these testing requirements. The three tasks were carried out with wide participation of experts from a number of organizations in the United States. Similar effort was performed by Japan, the European Community and the Soviet Union

  11. Economic analysis vs. capital-recovery requirements of power reactor decommissioning

    International Nuclear Information System (INIS)

    Ferguson, J.S.

    1980-01-01

    As a consultant to electric utilities the author often becomes involved in the development of policy for capital recovery and in the determination of depreciation rates that will implement the policy. Utility capital recovery is controlled by generally accepted depreciation accounting practices and by regulatory commission accounting rules and, as a result, can differ significantly from engineering economics. Those involved with decommissioning of power reactors should be aware of the depreciation accounting and regulatory framework that dictates capital recovery requirements, whether their involvement is related to engineering economics or capital recovery. This presentation defines that framework, points out several significant implications (particularly tax), describes several conforming capital-recovery methods, describes several techniques that have been used with the decommissioning component in economic analysis of alternative energy sources, and discusses why those involved in economic analysis should learn the accounting and regulatory framework for capital recovery

  12. Statement on Wind Power

    Energy Technology Data Exchange (ETDEWEB)

    2010-01-15

    Wind power will grow in importance in future electricity supply. In the next few decades it will to some degree replace fossil power but it will, at the same time also depend on fossil-b beyond, when wind power is expected to have a substantial share of the electricity market, CO{sub 2} emission-free electricity plants that are well suited for balancing the wind intermittency will be required. Predictions of the future penetration of wind power into the electricity market are critically dependent on a number of policy measures and will be especially influenced by climate driven energy policies. Very large investments will also be necessary as is shown by the lEA's Blue Map Scenario which includes 5,000 TWh wind electricity by 2050 at a cost of USD 700 billion. This implies an average 8% increase of wind electricity per year energy system, i.e. an energy system so large that it affects the entire world. The Energy Committee's scenario for electricity production in the year 2050 includes 5,000 TWh wind electricity out of a total of 45,000 TWh. Wind electricity thus has a within presently reached penetration of wind energy in a single country and within the calculated future projections of its penetration. Future large continental and intercontinental power grids may enable higher penetrations of wind energy since contributions of wind power from a larger area will tend to reduce its intermittency. Also, large-scale storage systems (thermal storage as is intermittent power systems. These alternatives have been discussed from a technical point of view [3] but for the required large-scale systems, further studies on the social, environmental and economical implications are needed

  13. Power requirements for cosmic ray propagation models involving diffusive reacceleration; estimates and implications for the damping of interstellar turbulence

    Science.gov (United States)

    Drury, Luke O.'C.; Strong, Andrew W.

    2017-01-01

    We make quantitative estimates of the power supplied to the Galactic cosmic ray population by second-order Fermi acceleration in the interstellar medium, or as it is usually termed in cosmic ray propagation studies, diffusive reacceleration. Using recent results on the local interstellar spectrum, following Voyager 1's crossing of the heliopause, we show that for parameter values, in particular the Alfvén speed, typically used in propagation codes such as GALPROP to fit the B/C ratio, the power contributed by diffusive reacceleration is significant and can be of order 50% of the total Galactic cosmic ray power. The implications for the damping of interstellar turbulence are briefly considered.

  14. Auxiliary System Load Schemes in Large Thermal and Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kuzle, I.; Bosnjak, D.; Pandzic, H.

    2010-01-01

    Uninterrupted auxiliary system power supply in large power plants is a key factor for normal operation, transient states, start-ups and shutdowns and particularly during fault conditions. Therefore, there are many challenges in designing the main electrical system as well as the auxiliary systems power supply. Depending upon the type of fuel used and the environmental control system required, a thermal power plant may consume as much as 10% of its total generation for auxiliary power, while a nuclear power plant may require only 4 - 6% auxiliaries. In general, the larger the power generating plant, the higher the voltage selected for the AC auxiliary electric system. Most stations in the 75 to 500 MW range utilize 4,2 kV as the base auxiliary system voltage. Large generating stations 500 - 1000 MW and more use voltage levels of 6,9 kV and more. Some single dedicated loads such as electric driven boiler feed pumps are supplied ba a 13,8 kV bus. While designing the auxiliary electric system, the following areas must be considered: motor starting requirements, voltage regulation requirements, short-circuit duty requirements, economic considerations, reliability and alternate sources. Auxiliary power supply can't be completely generalized and each situation should be studied on its own merits to determine the optimal solution. Naturally, nuclear power plants have more reliability requirements and safety design criteria. Main coolant-pump power supply and continuity of service to other vital loads deserve special attention. This paper presents an overview of some up-to-date power plant auxiliary load system concepts. The main types of auxiliary loads are described and the electric diagrams of the modern auxiliary system supply concepts are given. Various alternative sources of auxiliary electrical supply are considered, the advantages and disadvantages of these are compared and proposals are made for high voltage distribution systems around the thermal and nuclear plant

  15. Important statistics on engineering and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Budwani, R.N.

    1976-01-01

    During the past seven years, a study was made of the engineering and craft manpower/manhour requirements, craft breakdowns by totals and peaks, material requirements, unit man-hours, rate of manhour/capital expenditures, and schedule requirements of representative nuclear power plants across the United States. The study is based on information received from electric utilities, engineer-constructors, site visits, the Nuclear Regulatory Commission (NRC), personal contacts, and the exchange of information with knowledgeable people. Preliminary data in the form of tables and figures are presented. Factors which have and will influence manpower, manhours, material requirements, building volumes, and schedules are outlined, and a list of recommendations is presented. The objective of this study has been to show in a concise fashion what the trend has been and what may be anticipated for future nuclear power plants

  16. Power Electronics for the Next Generation Wind Turbine System

    DEFF Research Database (Denmark)

    Ma, Ke

    generation unit, are becoming crucial in the wind turbine system. The objective of this project is to study the power electronics technology used for the next generation wind turbines. Some emerging challenges as well as potentials like the cost of energy and reliability are going to be addressed. First...... conversion is pushed to multi-MW level with high power density requirement. It has also been revealed that thermal stress in the power semiconductors is closely related to many determining factors in the wind power application like the reliability, cost, power density, etc. therefore it is an important......The wind power generation has been steadily growing both for the total installed capacity and for the individual turbine size. Due to much more significant impacts to the power grid, the power electronics, which can change the behavior of wind turbines from an unregulated power source to an active...

  17. Calculus of the Power Spectral Density of Ultra Wide Band Pulse Position Modulation Signals Coded with Totally Flipped Code

    Directory of Open Access Journals (Sweden)

    DURNEA, T. N.

    2009-02-01

    Full Text Available UWB-PPM systems were noted to have a power spectral density (p.s.d. consisting of a continuous portion and a line spectrum, which is composed of energy components placed at discrete frequencies. These components are the major source of interference to narrowband systems operating in the same frequency interval and deny harmless coexistence of UWB-PPM and narrowband systems. A new code denoted as Totally Flipped Code (TFC is applied to them in order to eliminate these discrete spectral components. The coded signal transports the information inside pulse position and will have the amplitude coded to generate a continuous p.s.d. We have designed the code and calculated the power spectral density of the coded signals. The power spectrum has no discrete components and its envelope is largely flat inside the bandwidth with a maximum at its center and a null at D.C. These characteristics make this code suited for implementation in the UWB systems based on PPM-type modulation as it assures a continuous spectrum and keeps PPM modulation performances.

  18. Optimization of stand-alone photovoltaic systems with hydrogen storage for total energy self-sufficiency

    Energy Technology Data Exchange (ETDEWEB)

    Lund, P D [Helsinki Univ. of Technology, Espoo (Finland). Dept. of Technical Physics

    1991-01-01

    A new method for optimization of stand-alone photovoltaic-hydrogen energy systems is presented. The methodology gives the optimum values for the solar array and hydrogen storage size for any given system configuration and geographical site. Sensitivity analyses have been performed to study the effect of subsystem efficiencies on the total system performance and sizing, and also to identify possibilities for further improvements. Optimum system configurations have also been derived. The results indicate that a solar-hydrogen energy system is a very promising potential alternative for low power applications requiring a total electricity self-sufficiency. (Author).

  19. Material property requirements for application leak-before-break technology on nuclear power plant high-energy piping

    International Nuclear Information System (INIS)

    Li Chengliang; Deng Xiaoyun; Yin Zhiying; Liu Meng

    2012-01-01

    The application of leak-before-break (LBB) technology on nuclear power plant high-energy piping systems can improve their safety and economy, while propose some new requirements on testing material properties. The U.S. Nuclear Regulatory Commission's LBB related standard review plan and implementation specifications were analyzed, and test items, object, temperature, quantity and thermal aging effect of five general requirements were summarized. In addition, four key testing technical requirements, such as specimen size, side grooves, strain range and the orientation of specimens were also discussed to ensure the test data usefulness, representativeness and integrity. This study can provide some guidance for the aforementioned test program on domestic materials. (authors)

  20. Progress on PEP-II magnet power conversion system

    International Nuclear Information System (INIS)

    Bellomo, P.; Genova, L.; Jackson, T.; Shimer, D.

    1996-01-01

    The various power systems for supplying the PEP-II DC magnets rely exclusively on switchmode conversion, utilizing a variety of means depending on the requirements. All of the larger power supplies, ranging from 10 to 200 kW, are powered from DC sources utilizing rectified 480 V AC. Choppers can be used for the series connected strings, but for smaller groups and individual magnets, inverters driving high-frequency transformers with rectifiers comprise the best approach. All of the various systems use a ''building block'' approach of multiple standard-size units connected in series or parallel to most cost-effectively deal with a great range of voltage and current requirements. Utilization of existing infrastructure from PEP-I has been a cost-effective determinant. Equipment is being purchased either off-the-shelf, through performance specification, or by hardware purchase based on design-through-prototype. The corrector magnet power system, utilizing inexpensive, off-the-shelf, four-quadrant switching motor-controllers, has already proven very reliable: 120 of the total of 900 units have been running on the injection system for four months with no failures

  1. Progress on PEP-II magnet power conversion system

    Energy Technology Data Exchange (ETDEWEB)

    Bellomo, P.; Genova, L. [Stanford Linear Accelerator Center, Menlo Park, CA (United States); Jackson, T. [Lawrence Berkeley National Lab., CA (United States); Shimer, D. [Lawrence Livermore National Lab., CA (United States)

    1996-06-04

    The various power systems for supplying the PEP-II DC magnets rely exclusively on switchmode conversion, utilizing a variety of means depending on the requirements. All of the larger power supplies, ranging from 10 to 200 kW, are powered from DC sources utilizing rectified 480 V AC. Choppers can be used for the series connected strings, but for smaller groups and individual magnets, inverters driving high-frequency transformers with rectifiers comprise the best approach. All of the various systems use a ``building block`` approach of multiple standard-size units connected in series or parallel to most cost-effectively deal with a great range of voltage and current requirements. Utilization of existing infrastructure from PEP-I has been a cost-effective determinant. Equipment is being purchased either off-the-shelf, through performance specification, or by hardware purchase based on design-through-prototype. The corrector magnet power system, utilizing inexpensive, off-the-shelf, four-quadrant switching motor-controllers, has already proven very reliable: 120 of the total of 900 units have been running on the injection system for four months with no failures.

  2. Updated of the events tree of total loss of power at the site, SBO, taking into account the results of stress tests and methodological updates, convolution, and hydraulic power recovery from model RCPs

    International Nuclear Information System (INIS)

    Lopez Lorenzo, M. A.; Perez Martin, F.

    2013-01-01

    In this paper, is described a tree of events to an accident loss total power at the site (SBO) considering, first the results of stress tests arising from the Fukushima accident and moreover, various methodological updates related to this initiating event.

  3. Cross-layer combining of power control and adaptive modulation with truncated ARQ for cognitive radios

    Institute of Scientific and Technical Information of China (English)

    CHENG Shi-lun; YANG Zhen

    2008-01-01

    To maximize throughput and to satisfy users' requirements in cognitive radios, a cross-layer optimization problem combining adaptive modulation and power control at the physical layer and truncated automatic repeat request at the medium access control layer is proposed. Simulation results show the combination of power control, adaptive modulation, and truncated automatic repeat request can regulate transmitter powers and increase the total throughput effectively.

  4. Power requirements and environmental impact of a pedelec. A case study based on real-life applications

    Energy Technology Data Exchange (ETDEWEB)

    Abagnale, Carmelina, E-mail: c.abagnale@unina.it; Cardone, Massimo, E-mail: massimo.cardone@unina.it; Iodice, Paolo, E-mail: paolo.iodice@unina.it; Strano, Salvatore, E-mail: salvatore.strano@unina.it; Terzo, Mario, E-mail: m.terzo@unina.it; Vorraro, Giovanni, E-mail: giovanni.vorraro@unina.it

    2015-07-15

    This paper describes the methodologies to appraise the power requests and environmental analysis of an electrically assisted bicycle under real driving conditions, also containing regulations and technical-science-related aspects. For this purpose, in this study, the on-road test program of an electrically assisted bicycle was executed in the urban area of Naples on different test tracks, so a general assessment about its driving behavior under several driving conditions was performed. The power requirements in different typical riding situations were estimated by a procedure based on the experimental kinematic parameters that characterize the driving dynamics collected during the real-life applications. An environmental analysis was also performed, with a methodology that takes into account the environmental assessment of a moped by measuring the experimental moped exhaust emissions of the regulated pollutants. Starting from the results acquired during the different test samples, besides, an assessment of the electric traction offered by this pedelec on the driving comfort was evaluated for different riding situations. - Highlights: • The power requirements of a pedelec in typical riding conditions were identified. • The estimated electricity consumption for battery recharging was defined. • An environmental valuation of the tested pedelec and of a moped was performed. • Emissions that could be saved utilizing a pedelec instead of a moped were derived.

  5. Power requirements and environmental impact of a pedelec. A case study based on real-life applications

    International Nuclear Information System (INIS)

    Abagnale, Carmelina; Cardone, Massimo; Iodice, Paolo; Strano, Salvatore; Terzo, Mario; Vorraro, Giovanni

    2015-01-01

    This paper describes the methodologies to appraise the power requests and environmental analysis of an electrically assisted bicycle under real driving conditions, also containing regulations and technical-science-related aspects. For this purpose, in this study, the on-road test program of an electrically assisted bicycle was executed in the urban area of Naples on different test tracks, so a general assessment about its driving behavior under several driving conditions was performed. The power requirements in different typical riding situations were estimated by a procedure based on the experimental kinematic parameters that characterize the driving dynamics collected during the real-life applications. An environmental analysis was also performed, with a methodology that takes into account the environmental assessment of a moped by measuring the experimental moped exhaust emissions of the regulated pollutants. Starting from the results acquired during the different test samples, besides, an assessment of the electric traction offered by this pedelec on the driving comfort was evaluated for different riding situations. - Highlights: • The power requirements of a pedelec in typical riding conditions were identified. • The estimated electricity consumption for battery recharging was defined. • An environmental valuation of the tested pedelec and of a moped was performed. • Emissions that could be saved utilizing a pedelec instead of a moped were derived

  6. Feedback Blunting: Total Sleep Deprivation Impairs Decision Making that Requires Updating Based on Feedback.

    Science.gov (United States)

    Whitney, Paul; Hinson, John M; Jackson, Melinda L; Van Dongen, Hans P A

    2015-05-01

    To better understand the sometimes catastrophic effects of sleep loss on naturalistic decision making, we investigated effects of sleep deprivation on decision making in a reversal learning paradigm requiring acquisition and updating of information based on outcome feedback. Subjects were randomized to a sleep deprivation or control condition, with performance testing at baseline, after 2 nights of total sleep deprivation (or rested control), and following 2 nights of recovery sleep. Subjects performed a decision task involving initial learning of go and no go response sets followed by unannounced reversal of contingencies, requiring use of outcome feedback for decisions. A working memory scanning task and psychomotor vigilance test were also administered. Six consecutive days and nights in a controlled laboratory environment with continuous behavioral monitoring. Twenty-six subjects (22-40 y of age; 10 women). Thirteen subjects were randomized to a 62-h total sleep deprivation condition; the others were controls. Unlike controls, sleep deprived subjects had difficulty with initial learning of go and no go stimuli sets and had profound impairment adapting to reversal. Skin conductance responses to outcome feedback were diminished, indicating blunted affective reactions to feedback accompanying sleep deprivation. Working memory scanning performance was not significantly affected by sleep deprivation. And although sleep deprived subjects showed expected attentional lapses, these could not account for impairments in reversal learning decision making. Sleep deprivation is particularly problematic for decision making involving uncertainty and unexpected change. Blunted reactions to feedback while sleep deprived underlie failures to adapt to uncertainty and changing contingencies. Thus, an error may register, but with diminished effect because of reduced affective valence of the feedback or because the feedback is not cognitively bound with the choice. This has important

  7. Legislative framework and regulatory requirements for the introduction of nuclear power

    International Nuclear Information System (INIS)

    Ha-Vinh, Phuong

    1975-01-01

    The adoption of appropriate legislation is to be considered as a prerequisite to the introduction of nuclear power in view of the issues that need to be regulated. Preparatory steps should be started at the earliest stage in conjunction with the planning of nuclear power projects. The primary objectives of a licensing scheme are to ensure safety, public health and environmental protection as well as financial protection for third parties in case of nuclear incident. For licensing purposes, a legislative framework and regulatory determinations are required. Within such a framework and pursuant to such regulatory determinations, the elaboration of safety standards, rules, guides and enforcement procedures is to be considered of paramount importance. To this end a number of international recommendations and advisory material prepared by the IAEA provide useful guidance. A licensing process would normally be split into several stages relating to site approval, construction permit, pre-operational tests, and operating licence, each stage being subject to safety assessments and reviews as determined by regulations. Financial protection against nuclear damage has also to be insured. A special regime of nuclear liability has been established by international conventions, based on the principle of strict liability of the operator of a nuclear installation. As a result of such channelling of liability to him, his liability is limited in amount and time. This liability system has the dual purpose of ensuring appropriate protection for potential victims and of relieving the nuclear industry from unlimited liability risks, which would impede practical applications of atomic energy. For the elaboration of nuclear legislation and specialized regulations the Agency's advisory services have proved to be of help to countries embarking on a nuclear power programme. (author)

  8. A study on neural network representation of reactor power control procedures

    International Nuclear Information System (INIS)

    Moon, Byung Soo; Park, J. C.; Kim, Y. T.; Yang, S. U.; Lee, H. C.; Hwang, I. A.; Hwang, H. S.

    1997-12-01

    A neural algorithm to carry out the curve readings and arithmetic computations necessary for reactor power control is described in this report. The curve readings are for functions of the form z=f(x,y) and require fairly good interpolations. One of the functions is the total power defect as a function of reactor power and boron concentration. The second is the new position of control rod as a function of the current rod position and the increment of total power defect needed for the required power change. The curves involving xenon effect are also considered separately. We represented these curves by cubic spline interpolations first and then converted them to fuzzy systems so that they perform the identical interpolations as the splines. The resulting fuzzy systems are then converted to artificial neural networks similar to the RBF type neural network. These networks still carry the O(h'4) accuracy as the cubic spline interpolating functions. Also included is a description of an important result on how to find the spline interpolation coefficients without solving the matrix equation, when the function is a polynomial of the form f(t)=t'm. This result provides a systematic way of presenting continuous functions by fuzzy systems and hence by artificial neural networks without any training. (author). 10 refs., 2 tabs., 10 figs

  9. Nuclear power: the achievements, the problems and the myths. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hill, J [UKAEA

    1976-02-01

    The total energy requirements of the UK and problems associated with various energy sources including wind, tide, solar, geothermal, hydroelectric, and fossil fuels are reveiwed and their future contribution considered. Nuclear power is discussed with emphasis on costs, technical problems, and future developments.

  10. A fresh look at electron cyclotron current drive power requirements for stabilization of tearing modes in ITER

    Energy Technology Data Exchange (ETDEWEB)

    La Haye, R. J., E-mail: lahaye@fusion.gat.com [General Atomics, P.O. Box 85608, San Diego, California 92186-5608 (United States)

    2015-12-10

    ITER is an international project to design and build an experimental fusion reactor based on the “tokamak” concept. ITER relies upon localized electron cyclotron current drive (ECCD) at the rational safety factor q=2 to suppress or stabilize the expected poloidal mode m=2, toroidal mode n=1 neoclassical tearing mode (NTM) islands. Such islands if unmitigated degrade energy confinement, lock to the resistive wall (stop rotating), cause loss of “H-mode” and induce disruption. The International Tokamak Physics Activity (ITPA) on MHD, Disruptions and Magnetic Control joint experiment group MDC-8 on Current Drive Prevention/Stabilization of Neoclassical Tearing Modes started in 2005, after which assessments were made for the requirements for ECCD needed in ITER, particularly that of rf power and alignment on q=2 [1]. Narrow well-aligned rf current parallel to and of order of one percent of the total plasma current is needed to replace the “missing” current in the island O-points and heal or preempt (avoid destabilization by applying ECCD on q=2 in absence of the mode) the island [2-4]. This paper updates the advances in ECCD stabilization on NTMs learned in DIII-D experiments and modeling during the last 5 to 10 years as applies to stabilization by localized ECCD of tearing modes in ITER. This includes the ECCD (inside the q=1 radius) stabilization of the NTM “seeding” instability known as sawteeth (m/n=1/1) [5]. Recent measurements in DIII-D show that the ITER-similar current profile is classically unstable, curvature stabilization must not be neglected, and the small island width stabilization effect from helical ion polarization currents is stronger than was previously thought [6]. The consequences of updated assumptions in ITER modeling of the minimum well-aligned ECCD power needed are all-in-all favorable (and well-within the ITER 24 gyrotron capability) when all effects are included. However, a “wild card” may be broadening of the localized

  11. Dynamic power balance analysis in JET

    International Nuclear Information System (INIS)

    Matthews, G F; Silburn, S A; Challis, C D; Iglesias, D; King, D; Eich, T; Sieglin, B; Contributors, JET

    2017-01-01

    The full scale realisation of nuclear fusion as an energy source requires a detailed understanding of power and energy balance in current experimental devices. In this we explore whether a global power balance model in which some of the calibration factors applied to the source or sink terms are fitted to the data can provide insight into possible causes of any discrepancies in power and energy balance seen in the JET tokamak. We show that the dynamics in the power balance can only be properly reproduced by including the changes in the thermal stored energy which therefore provides an additional opportunity to cross calibrate other terms in the power balance equation. Although the results are inconclusive with respect to the original goal of identifying the source of the discrepancies in the energy balance, we do find that with optimised parameters an extremely good prediction of the total power measured at the outer divertor target can be obtained over a wide range of pulses with time resolution up to ∼25 ms. (paper)

  12. Power Requirements Determined for High-Power-Density Electric Motors for Electric Aircraft Propulsion

    Science.gov (United States)

    Johnson, Dexter; Brown, Gerald V.

    2005-01-01

    Future advanced aircraft fueled by hydrogen are being developed to use electric drive systems instead of gas turbine engines for propulsion. Current conventional electric motor power densities cannot match those of today s gas turbine aircraft engines. However, if significant technological advances could be made in high-power-density motor development, the benefits of an electric propulsion system, such as the reduction of harmful emissions, could be realized.

  13. Taking the reins of power

    International Nuclear Information System (INIS)

    Cavenagh, Andrew.

    1997-01-01

    The growing contract energy management business in the United Kingdom is examined. At the top end, established electricity generators are supplying combined heat and power plants of over 20MW or so to meet the steam, power and heating requirements of large industrial sites on contracts of, typically, 15-20 years. These are very much the province of companies such as National Power and PowerGen familiar with linking into the high voltage transmission system and hence able to sell surplus power from these projects into the National Grid. A much wider range of services is on offer by other more specialised companies. These range from the supply and operation of combined heat and power plants to smaller companies, to fuel purchasing contracts and the monitoring of energy consumption of existing facilities in public buildings. Cost cutting is the driving attraction of contract energy management for the purchasers, but there are other advantages. The view of one company, for example, is that it enables them to focus on their core business while leaving energy production and management to a third party whose core business that is. Energy costs become totally forecastable and expertise is always at hand. (UK)

  14. Investigation of high-alpha lateral-directional control power requirements for high-performance aircraft

    Science.gov (United States)

    Foster, John V.; Ross, Holly M.; Ashley, Patrick A.

    1993-01-01

    Designers of the next-generation fighter and attack airplanes are faced with the requirements of good high angle-of-attack maneuverability as well as efficient high speed cruise capability with low radar cross section (RCS) characteristics. As a result, they are challenged with the task of making critical design trades to achieve the desired levels of maneuverability and performance. This task has highlighted the need for comprehensive, flight-validated lateral-directional control power design guidelines for high angles of attack. A joint NASA/U.S. Navy study has been initiated to address this need and to investigate the complex flight dynamics characteristics and controls requirements for high angle-of-attack lateral-directional maneuvering. A multi-year research program is underway which includes groundbased piloted simulation and flight validation. This paper will give a status update of this program that will include a program overview, description of test methodology and preliminary results.

  15. Development of 350 MHz/1000 Watt intermediate power amplifier for 400 keV RFQ accelerator

    International Nuclear Information System (INIS)

    Pande, M.M.; Patel, N.R.; Shinde, K.R.; Rao, M.K.V.; Handu, V.K.

    2005-01-01

    Two numbers of high power RF systems, each delivering around 35 to 40 kW of power at 350 MHz are being developed in BARC. These High Power Amplifiers (HPA) cater to the total need of 70 kW of RF power required by the 400 keV (Deuterium) RFQ accelerator. This RFQ will replace the existing 400 keV DC accelerator of 14 MeV Neutron Generator. The RFQ will accelerate a deuterium beam from 50 keV to 400 keV to impinge upon a tritium target inside a sub critical assembly. Each of these 35 / 40 KW HPA requires a drive power of around 1000 / 1500 Watt respectively. Hence a intermediate power amplifier (IPA) bas been designed to deliver the power of 1000 Watt at the rate of 350 MHz. The paper describes the development of this amplifier

  16. Magnet power supply system for the ALS storage ring and booster

    International Nuclear Information System (INIS)

    Jackson, L.T.; Luchini, K.; Lutz, I.

    1993-05-01

    The Magnet Power Supply System is described by specification, design, hardware, and operating experience. A unique system for the one Hz, 1.5 GeV Booster, where the wideband QF and QD power supplies track the dipole current to within 0.1% at injection will be detailed. AC distribution system considerations related to inverting the stored energy of the booster magnet back into power grid will be discussed. The rational for linear correctors and individual quad supplies (225 total units) will be placed within the context of the storage-ring requirements

  17. Requirements for class 1, 2, and 3 pressure-retaining systems and components in CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1991-09-01

    This third edition of CAN/CSA-N285.1 supersedes the 1981 and 1975 editions. It provides the specific requirements for design, fabrication, and installation of Class 1, 2 and 3 pressure-retaining systems and components in CANDU nuclear power plants, and over pressure protection of the heat transport system. The general requirements for pressure-retaining systems and components are given in CSA Standard CAN/CSA-N285.0, with which Class 1, 2 and 3 systems and components must also comply

  18. An ultra-low power CMOS image sensor with on-chip energy harvesting and power management capability.

    Science.gov (United States)

    Cevik, Ismail; Huang, Xiwei; Yu, Hao; Yan, Mei; Ay, Suat U

    2015-03-06

    An ultra-low power CMOS image sensor with on-chip energy harvesting and power management capability is introduced in this paper. The photodiode pixel array can not only capture images but also harvest solar energy. As such, the CMOS image sensor chip is able to switch between imaging and harvesting modes towards self-power operation. Moreover, an on-chip maximum power point tracking (MPPT)-based power management system (PMS) is designed for the dual-mode image sensor to further improve the energy efficiency. A new isolated P-well energy harvesting and imaging (EHI) pixel with very high fill factor is introduced. Several ultra-low power design techniques such as reset and select boosting techniques have been utilized to maintain a wide pixel dynamic range. The chip was designed and fabricated in a 1.8 V, 1P6M 0.18 µm CMOS process. Total power consumption of the imager is 6.53 µW for a 96 × 96 pixel array with 1 V supply and 5 fps frame rate. Up to 30 μW of power could be generated by the new EHI pixels. The PMS is capable of providing 3× the power required during imaging mode with 50% efficiency allowing energy autonomous operation with a 72.5% duty cycle.

  19. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  20. The total artificial heart.

    Science.gov (United States)

    Cook, Jason A; Shah, Keyur B; Quader, Mohammed A; Cooke, Richard H; Kasirajan, Vigneshwar; Rao, Kris K; Smallfield, Melissa C; Tchoukina, Inna; Tang, Daniel G

    2015-12-01

    The total artificial heart (TAH) is a form of mechanical circulatory support in which the patient's native ventricles and valves are explanted and replaced by a pneumatically powered artificial heart. Currently, the TAH is approved for use in end-stage biventricular heart failure as a bridge to heart transplantation. However, with an increasing global burden of cardiovascular disease and congestive heart failure, the number of patients with end-stage heart failure awaiting heart transplantation now far exceeds the number of available hearts. As a result, the use of mechanical circulatory support, including the TAH and left ventricular assist device (LVAD), is growing exponentially. The LVAD is already widely used as destination therapy, and destination therapy for the TAH is under investigation. While most patients requiring mechanical circulatory support are effectively treated with LVADs, there is a subset of patients with concurrent right ventricular failure or major structural barriers to LVAD placement in whom TAH may be more appropriate. The history, indications, surgical implantation, post device management, outcomes, complications, and future direction of the TAH are discussed in this review.

  1. Total integrated energy system (TIES) feasibility analysis for the downtown redevelopment project, Pasadena, California

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-04-01

    The purpose of this study is to determine the most desirable method of serving the energy needs of a commercial development to be constructed in Pasadena, California. The factors that determine maximum desirability consist of the following: (1) maximum economic benefit to the energy user and to the surrounding community; (2) minimum usage of energy by both the energy user and the surrounding community; and (3) minimum introduction of pollutants into the community. The methods studied were the Total Integrated Energy System (TIES) concept in several configurations. The TIES concept differs from the ''total energy concept'' in the respect that the electric power output of the local power generation plant goes into the utility company distribution grid, rather than to the user. The user is served power from the grid, as with a conventional system, but also receives heating and cooling media produced from power generation by-product heat from the TIES plant. The effect of this concept is that a very large source-sink for electric energy is provided by the utility company grid. This, in turn, permits the plant to operate in response to instantaneous thermal demand, rather than instantaneous power demand. No auxiliary firing is ever required. No waste of unneeded by-product energy to atmosphere ever occurs. Balance is achieved by either delivering excess power into the grid or by withdrawing power production deficiency from the grid. Near-optimum efficiency is achieved during all operating conditions. There is no need whatsoever for the power-generating plant to be sized to meet the power demand, since it seldom, if ever, tracks the power demand. Sizing of the electric generation is solely a function of economics and the demand for waste heat.

  2. A comparison of energy conversion systems for meeting the power requirements of manned rover for Mars missions

    International Nuclear Information System (INIS)

    El-Genk, M.S.; Morley, N.; Cataldo, R.; Bloomfield, H.

    1990-01-01

    Minimizing system mass for interplanetary missions is of utmost importance in order to keep launch cost within reasonable bounds. For a manned Mars rover, powered by a nuclear reactor power system, the choice of the energy conversion system can play a significant role in lowering the overall system mass. Not only is the mass of the conversion unit affected by the choice, but also the masses of the reactor core, waste heat rejection system, and the radiation shield which are strongly influenced by the system conversion efficiency and operating condition. Several types of conversion systems are of interest for a nuclear reactor Mars manned application. These conversion systems include: free piston Stirling engines, He/XE closed Brayton cycle (CBC), CO 2 open Brayton, and SiGe/GaP thermoelectric. Optimization studies are conducted to determine the impact of the conversion system on the overall mass of the nuclear power system as well as the mobility power requirement of the Rover vehicle

  3. ALSTOM supercritical steam plants meet Polish market challenges and power generator's requirements

    Energy Technology Data Exchange (ETDEWEB)

    Twardowski, A.

    2007-07-01

    From the early 1990s the age and technical performance of most of the Polish power plants required urgent investment including rehabilitation and/or replacement. This was necessary as power demand was increasing continuously in parallel with country GDP growth. Poland's joining the EU in May 2005 caused additional obligations related to limitation of emissions by Poland as a country and specifically by the Polish power sector. The first big project focussed on replacement of old equipment, improvement of electricity production efficiency and reduction of environmental impact by rehabilitation of Units 1-6 in Turow power plant. This is briefly described in the presentation. The latest and the biggest project is the construction of a new supercritical, lignite fired 833 MW unit in BOT Belchatow PP awarded to ALSTOM in December 2004 as a full term key contract. In addition to a new power block the project included: a new desulfurisation plant; a complete close circle cooling system; a new electrical system control system, and water treatment system; a coal handling system connecting the new unit with lignite transportation system from the open mine to the existing plant; hydraulic ash and slug systems; and an electrostatic precipitator. The unit has reduced NOx emissions to the level below 200 mg/Nm{sup 3} thanks to low emission burners. Particulate emissions are below 30 mg/Nm{sup 3}, SOx emissions are below 220 mg/Nm{sup 3}; CO{sub 2} emissions are lowered and cooling water consumption reduced. Special noise protection systems and special design of some systems has greatly reduced the noise level. 2 photos.

  4. The role of advanced nuclear power technologies in developing countries: Criteria and design requirements

    International Nuclear Information System (INIS)

    1990-02-01

    The document includes the papers presented at the following two technical committee meetings organized by the IAEA: Technical Committee Meeting and Workshop on Criteria for the Introduction of Advanced Nuclear Power Technologies for Specific Applications in Developing Countries, Vienna, 27-30 June 1988 (14 papers) and Technical Committee Meeting and Workshop on Design Requirements for the Application of Advanced Concepts in Developing Countries, Vienna, 6-9 December 1988 (16 papers). A separate abstract was prepared for each of these papers

  5. Kickers and power supplies for the Fermilab Tevatron I antiproton source

    International Nuclear Information System (INIS)

    Castellano, T.; Bartoszek, L.; Tilles, E.; Petter, J.; McCarthy, J.

    1985-05-01

    The Fermilab Antiproton Source Accumulator and Debuncher rings require 5 kickers in total. These range in design from conventional ferrite delay line type magnets, with ceramic beam tubes to mechanically complex shuttered kickers situated entirely in the Accumulator Ring's 10 -10 torr vacuum. Power supplies are thyratron switched pulse forming networks that produce microsecond width pulses of several kiloamps with less than 30 nanoseconds rise and fall times. Kicker and power supply design requirements for field strength, vacuum, rise and fall time, timing and magnetic shielding of the stacked beam in the accumulator by the eddy current shutter will be discussed. 8 refs., 3 figs., 2 tabs

  6. Special safety requirements applied to Brazilian nuclear power plant

    International Nuclear Information System (INIS)

    Lepecki, W.P.S.; Hamel, H.J.E.; Koenig, N.; Vieira, P.C.R.; Fritzsche, J.C.

    1981-01-01

    Some safety aspects of the Angra 2 and 3 nuclear power plants are presented. An analysis of the civil and mechanical project of these nuclear power plant having in view a safety analysis is done. (E.G.) [pt

  7. Nuclear power for tomorrow

    International Nuclear Information System (INIS)

    Csik, B.J.; Konstantinov, L.V.; Dastidar, P.

    1989-09-01

    The evolution of nuclear power has established this energy source as a viable mature technology, producing at comparative costs more than 16% of the electricity generated world-wide. After outlining the current status of nuclear power, extreme future scenarios are presented, corresponding respectively to maximum penetration limited by technical-economic characteristics, and nuclear phase-out at medium term. The situation is complex and country specific. The relative perception of the importance of different factors and the compensation of advantages vs. disadvantages, or risk vs. benefits, has predominant influence. In order to proceed with an objective and realistic estimate of the future role of nuclear power worldwide, the fundamental factors indicated below pro nuclear power and against are assessed, including expected trends regarding their evolution: Nuclear safety risk; reduction to levels of high improbability but not zero risk. Reliable source of energy; improvements towards uniform standards of excellence. Economic competitiveness vs. alternatives; stabilization and possible reduction of costs. Financing needs and constraints; availability according to requirements. Environmental effects; comparative analysis with alternatives. Public and political acceptance; emphasis on reason and facts over emotions. Conservation of fossil energy resources; gradual deterioration but no dramatic crisis. Energy supply assurance; continuing concerns. Infrastructure requirements and availability; improvements in many countries due to overall development. Non-proliferation in military uses; separation of issues from nuclear power. IAEA forecasts to the year 2005 are based on current projects, national plans and policies and on prevailing trends. Nuclear electricity generation is expected to reach about 18% of total worldwide electricity generation, with 500 to 580 GW(e) installed capacity. On a longer term, to 2030, a stabilized role and place among available viable

  8. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  9. An Approach to Establish Design Requirements for Human-System Interface (HSI) of Automatic Systems in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Nuraslinda, Anuar; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-05-15

    This paper aims to demonstrate an approach to establish the design requirements for automatic systems in nuclear power plant (NPP) by using a powerful tool called Itemized Sequence Diagram (ISD). The process starts with function allocation by defining a set of levels of automation (LOAs). Then, task allocation is done using the ISD and finally the design requirements are established by examining the interaction points between human operator and automation, which are all located on the interface as modeled in the ISD. The strengths of this approach are discussed and a suggestion to integrate with that of the methodology employed to produce the existing guidelines or guidance is included in this paper. Some issues of automation have been addressed earlier in this paper and 12 design requirements that address human-system interaction were suggested by using the ISD as a tool to identify the interaction points between human operator and automation. The integration of the proposed approach in this paper with that of existing guidance could result in the new issue identification that would call for the establishment of new guidance. For example, Requirement 11 states that the HSI should provide the means for take-over from automatic to manual control was not mentioned in the existing guidance.

  10. Southeastern Power Administration 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  11. Does IQ explain socio-economic differentials in total and cardiovascular disease mortality? Comparison with the explanatory power of traditional cardiovascular disease risk factors in the Vietnam Experience Study

    DEFF Research Database (Denmark)

    Batty, G David; Shipley, Martin J; Dundas, Ruth

    2009-01-01

    The aim of this study was to examine the explanatory power of intelligence (IQ) compared with traditional cardiovascular disease (CVD) risk factors in the relationship of socio-economic disadvantage with total and CVD mortality, that is the extent to which IQ may account for the variance in this ......The aim of this study was to examine the explanatory power of intelligence (IQ) compared with traditional cardiovascular disease (CVD) risk factors in the relationship of socio-economic disadvantage with total and CVD mortality, that is the extent to which IQ may account for the variance...

  12. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  13. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  14. The Sydvaerme project: District heating from the Barsebeck nuclear power plant

    International Nuclear Information System (INIS)

    Josefsson, L.

    1977-01-01

    The paper presents a summary report of a study on district heating from Barsebeck Nuclear Power Plant in Sweden, prepared cooperatively by the cities of Malmoe, Lund, Helsingborg, Landskrona and the electric power company Sydkraft. A future number 3 generating set at the Barsebeck nuclear power station could be designed for combined production of heat and electric power. The generating set could be completed after 1983, and could then supply about 65% of total district heating requirements. The first stage of the investigation includes a proposal for a technically feasible solution, sufficiently detailed to permit both technical and economic evaluation of the project. (author)

  15. Technical evaluation of RETS-required reports for Zion Nuclear Power Station, Units 1 and 2 for 1983

    International Nuclear Information System (INIS)

    Young, T.E.; Magleby, E.H.

    1985-01-01

    A review was performed on the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at Commonwealth Edison's Zion Nuclear Power Station during 1983. The two periodic reports reviewed: (1) were the Effluent and Waste Disposal Semiannual Report, July-December 1983, and (2) the Radioactive Waste and Environmental Monitoring Annual Report - 1983. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  16. Wind Farms’ Spatial Distribution Effect on Power System Reserves Requirements

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio

    2010-01-01

    The wind power development during last millennium was typically based on small wind turbines dispersed over large areas, leading to a significant smoothing of the wind power fluctuations in a power system balancing area. The present development goes towards much larger wind farms, concentrated...

  17. China power - thermal coal and clean coal technology export. Topical report

    Energy Technology Data Exchange (ETDEWEB)

    Binsheng Li

    1996-12-31

    China is the world`s fourth largest electric power producer, and is expected to surpass Japan within the next two years to become the third largest power producer. During the past 15 years, China`s total electricity generation more than tripled, increasing from about 300 TWh to about 1,000 TWh. Total installed generating capacity grew at an average of 8.2 percent per year, increasing from 66 to 214 GW. The share of China`s installed capacity in Asia increased from 21 to 31 percent. The Chinese government plans to continue China`s rapid growth rate in the power sector. Total installed capacity is planned to reach 300 GW by 2000, which will generate 1,400 TWh of electricity per year. China`s long-term power sector development is subject to great uncertainty. Under the middle scenario, total capacity is expected to reach 700 GW by 2015, with annual generation of 3,330 TWh. Under the low and high scenarios, total capacity will reach 527-1,005 GW by 2015. The high scenario representing possible demand. To achieve this ambitious scenario, dramatic policy changes in favor of power development are required; however, there is no evidence that such policy changes will occur at this stage. Even under the high scenario, China`s per capita annual electricity consumption would be only 3,000 kWh by 2015, less than half of the present per capita consumption for OECD countries. Under the low scenario, electricity shortages will seriously curb economic growth.

  18. The generation of pollution-free electrical power from solar energy.

    Science.gov (United States)

    Cherry, W. R.

    1971-01-01

    Projections of the U.S. electrical power demands over the next 30 years indicate that the U.S. could be in grave danger from power shortages, undesirable effluence, and thermal pollution. An appraisal of nonconventional methods of producing electrical power is conducted, giving particular attention to the conversion of solar energy into commercial quantities of electrical power by solar cells. It is found that 1% of the land area of the 48 states could provide the total electrical power requirements of the U.S. in the year 1990. The ultimate method of generating vast quantities of electrical power would be from a series of synchronous satellites which beam microwave power back to earth to be used wherever needed. Present high manufacturing costs of solar cells could be substantially reduced by using massive automated techniques employing abundant low cost materials.

  19. Siemens IT solutions for power sector. PROFIT solutions

    International Nuclear Information System (INIS)

    Lunter, P.

    2004-01-01

    The cost reduction, flexibility and revenue increase, potential exploitation, productivity increase, and business opportunities exploitation - that is all what can be required in the races for the promonent positioning on the electricity power market. These requirements can be realized by the sophisticated IT solutions hand-tailored to the special requirements of the electric power producers and tradesmen. This approach makes it possible to achieve greater profit. Our solutions 'PROFIT Solutions', that are symbiosis of the most progressive information technologies and the power plant techniques of the company Siemens, satisfy submitted specifications in substantial measure. The system solutions 'PROFIT Solutions' comprise three solution groups: process, operation a business. The solutions of the group 'IT Process Solutions' increase flexibility and manoeuvrability of equipment, improve the efficiency and contribute to more economical operation of the power generation. Solutions 'IT Process Solutions' simplify and shorten the period of power cycles and conduce to higher labour productivity. Solutions group 'IT Process Solutions' approaches equipment to the market - supports the profit strategies, helps quickly and expertly to determine and predict hazards. The extension PROFIT Cockpit means the nuance to the solutions world 'PROFIT Solutions'. The survey about the whole installation is within reach at the simple touch of a button. It is possible to compile the total system part by part from single solutions 'PROFIT Solutions'. As a matter of fact all single parts can be interconnected with already existing solutions. Routines 'PROFIT Solutions' cooperate with all modern control systems. (author)

  20. Nuclear power programmes and medium term projections in the OECD area

    International Nuclear Information System (INIS)

    Miida, J.; Haeussermann, W.; Mankin, S.

    1977-01-01

    The paper describes nuclear power growth forecasts up to 1985 on an individual country basis for the OECD area, based on present nuclear programmes. For the period between 1985 and the year 2000, no individual countries' estimates are given. The projections for this period are subdivided into three main areas: OECD Europe, North America and OECD Pacific Region. These projections are derived from the presently prevailing estimates concerning total energy growth, the increasing share of electricity requirements in total energy requirements and the growth of the nuclear share in electrical installed capacity. The basic assumptions are discussed and the combination of various possibilities results in upper and lower growth limits, which should include the most likely development. An attempt is also made to describe probable scenarios of nuclear reactor strategies, taking into account developments under way in the OECD area. Finally, the factors liable to influence nuclear power growth in a positive or negative way are briefly analysed

  1. Southeastern Power Administration 2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to

  2. Status and development of nuclear power program in Korea

    International Nuclear Information System (INIS)

    Choi, C.T.

    1991-01-01

    The low availability in Korea of indigenous energy resources in the forms of water power and coal, and the oil squeeze in the seventies, have caused nuclear power to be expanded into the country's main primary energy source. Nine nuclear generating units with a cumulated power of 7616 MWe have been commissioned since 1978 and now contribute 36.2% to the power generating capacity of the country. In 1990, the nine nuclear plants converted 52.9 TWh of nuclear power into electricity, thus covering some 50% of the Korean electricity supply, as already in 1989. In the past three years, the electricity requirement rose by an annual 13.7%. In the light of a forecast continued rise by 5% to 8% annually up until 2006, the nuclear generating capacity then installed would have to be 23 229 MWe, which would be some 40% of the total generating capacity required. Under the long term energy plan of the Korean Energy Ministry, nine new nuclear generating units with an aggregate 8100 MWe will be built by 2001, and another nine units by the year 2006. (orig.) [de

  3. Low Power Design with High-Level Power Estimation and Power-Aware Synthesis

    CERN Document Server

    Ahuja, Sumit; Shukla, Sandeep Kumar

    2012-01-01

    Low-power ASIC/FPGA based designs are important due to the need for extended battery life, reduced form factor, and lower packaging and cooling costs for electronic devices. These products require fast turnaround time because of the increasing demand for handheld electronic devices such as cell-phones, PDAs and high performance machines for data centers. To achieve short time to market, design flows must facilitate a much shortened time-to-product requirement. High-level modeling, architectural exploration and direct synthesis of design from high level description enable this design process. This book presents novel research techniques, algorithms,methodologies and experimental results for high level power estimation and power aware high-level synthesis. Readers will learn to apply such techniques to enable design flows resulting in shorter time to market and successful low power ASIC/FPGA design. Integrates power estimation and reduction for high level synthesis, with low-power, high-level design; Shows spec...

  4. Requirements for a Hydrogen Powered All-Electric Manned Helicopter

    Science.gov (United States)

    Datta, Anubhav

    2012-01-01

    The objective of this paper is to set propulsion system targets for an all-electric manned helicopter of ultra-light utility class to achieve performance comparable to combustion engines. The approach is to begin with a current two-seat helicopter (Robinson R 22 Beta II-like), design an all-electric power plant as replacement for its existing piston engine, and study performance of the new all-electric aircraft. The new power plant consists of high-pressure Proton Exchange Membrane fuel cells, hydrogen stored in 700 bar type-4 tanks, lithium-ion batteries, and an AC synchronous permanent magnet motor. The aircraft and the transmission are assumed to remain the same. The paper surveys the state of the art in each of these areas, synthesizes a power plant using best available technologies in each, examines the performance achievable by such a power plant, identifies key barriers, and sets future technology targets to achieve performance at par with current internal combustion engines.

  5. Virtual environments for nuclear power plant design

    International Nuclear Information System (INIS)

    Brown-VanHoozer, S.A.; Singleterry, R.C. Jr.; King, R.W.

    1996-01-01

    In the design and operation of nuclear power plants, the visualization process inherent in virtual environments (VE) allows for abstract design concepts to be made concrete and simulated without using a physical mock-up. This helps reduce the time and effort required to design and understand the system, thus providing the design team with a less complicated arrangement. Also, the outcome of human interactions with the components and system can be minimized through various testing of scenarios in real-time without the threat of injury to the user or damage to the equipment. If implemented, this will lead to a minimal total design and construction effort for nuclear power plants (NPP)

  6. Delta Power Control Strategy for Multistring Grid-Connected PV Inverters

    DEFF Research Database (Denmark)

    Sangwongwanich, Ariya; Yang, Yongheng; Blaabjerg, Frede

    2017-01-01

    , is required for grid support (e.g., during frequency deviation). In this paper, a cost-effective solution to realize delta power control (DPC) for grid-connected PV systems is presented, where the multistring PV inverter configuration is adopted. This control strategy is a combination of maximum power point...... tracking (MPPT) and constant power generation (CPG) modes. In this control scheme, one PV string operating in the MPPT mode estimates the available power, whereas the other PV strings regulate the total PV power by the CPG control strategy in such a way that the delta power constraint for the entire PV...... system is achieved. Simulations and experiments have been performed on a 3-kW single-phase grid-connected PV system. The results have confirmed the effectiveness of the proposed DPC strategy, where the power reserve according to the delta power constraint is achieved under several operating conditions....

  7. Variable Frequency Operations of an Offshore Wind Power Plant with HVDC-VSC: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Singh, M.; Muljadi, E.

    2011-12-01

    In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated. Based on DOE study, wind power generation may reach 330 GW by 2030 at the level of penetration of 20% of the total energy production. From this amount of wind power, 54 GW of wind power will be generated at offshore wind power plants. The deployment of offshore wind power plants requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cable, there is a need to use High-Voltage Direct Current (HVDC) transmission. Otherwise, if the power is transmitted via alternating current, the reactive power generated by the cable capacitance may cause an excessive over voltage in the middle of the transmission distance which requires unnecessary oversized cable voltage breakdown capability. The use of HVDC is usually required for transmission distance longer than 50 kilometers of submarine cables to be economical. The use of HVDC brings another advantage; it is capable of operating at variable frequency. The inland substation will be operated to 60 Hz synched with the grid, the offshore substation can be operated at variable frequency, thus allowing the wind power plant to be operated at constant Volt/Hz. In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.

  8. Isar-2 nuclear power station twenty-five years

    International Nuclear Information System (INIS)

    Fischer, Erwin; Luginger, Markus

    2013-01-01

    The Isar-2 nuclear power station (KKI 2) began commercial power operation on April 9, 1988. In these past 25 years the plant generated a total of approx. 285 billion kWh of electricity. The annual electricity production of KKI 2 of approx. 12 billion kWh corresponds to a share of approx. 15 % in the cumulated Bavarian electricity production. This amount of electricity, theoretically, could supply some 3 million three person households, or meet two thirds of the electricity requirement of the Bavarian industry, for one year. In its 25 years of power operation the Isar-2 nuclear power plant has recorded the highest annual gross electricity production of all nuclear power plants in the world nine times so far. A plant performance as impressive as this necessitates a plant availability far above the average. This, in turn, is based on short revision times and faultfree plant operation. However, high plant safety and availability must not be taken for granted, but are the result of responsible, safety-minded plant operation combined with continuous plant optimization and permanent execution of comprehensive checks, inspections, and maintenance measures. Besides plant technology also organization and administration were permanently advanced and adapted to changing requirements so as to safeguard reliable, safe, and non-polluting plant operation.

  9. Non-Cooled Power System for Venus Lander

    Science.gov (United States)

    Salazar, Denise; Landis, Geoffrey A.; Colozza, Anthony J.

    2014-01-01

    The Planetary Science Decadal Survey of 2013-2022 stated that the exploration of Venus is of significant interest. Studying the seismic activity of the planet is of particular importance because the findings can be compared to the seismic activity of Earth. Further, the geological and atmospheric properties of Venus will shed light into the past and future of Earth. This paper presents a radioisotope power system (RPS) design for a small low-power Venus lander. The feasibility of the new power system is then compared to that of primary batteries. A requirement for the power source system is to avoid moving parts in order to not interfere with the primary objective of the mission - to collect data about the seismic activity of Venus using a seismometer. The target mission duration of the lander is 117 days, a significant leap from Venera 13, the longest-lived lander on the surface of Venus, which survived for 2 hours. One major assumption for this mission design is that the power source system will not provide cooling to the other components of the lander. This assumption is based on high-temperature electronics technology that will enable the electronics and components of the lander to operate at Venus surface temperature. For the proposed RPS, a customized General Purpose Heat Source Radioisotope Thermoelectric Generator (GPHSRTG) is designed and analyzed. The GPHS-RTG is chosen primarily because it has no moving parts and it is capable of operating for long duration missions on the order of years. This power system is modeled as a spherical structure for a fundamental thermal analysis. The total mass and electrical output of the system are calculated to be 24 kilograms and 26 Watts, respectively. An alternative design for a battery-based power system uses Sodium Sulfur batteries. To deliver a similar electrical output for 117 days, the battery mass is calculated to be 234 kilograms. Reducing mission duration or power required will reduce the required battery mass

  10. Requirements for, and training and certification of, quality assurance technicians for nuclear power plants

    International Nuclear Information System (INIS)

    Saiz, A.; Mir, A.; Serrano, J.

    1982-01-01

    The paper examines the requirements for, and training and certification of, technicians working in a quality assurance department at periods when the site, the main supplier and the engineering firm are being selected for construction, commissioning and operation of a light-water nuclear power plant with an output of approximately 1000 MW(e). In determining the system to be applied for the present work, account is taken of the special fields of engineering, supply, commissioning and operation. To this end, an analysis is made of the necessary organization, pointing out the number of technicians in each of the phases mentioned, and the necessary experience and knowledge required for discharging the functions indicated and for obtaining the appropriate certification. The second generation of Spanish nuclear power stations - about 7500MW(e) - demonstrated the need for quality assurance technicians. The Spanish Atomic Forum, a member of Foratom, is the first Spanish body to deal with the problem of training of such technicians at the national level through holding of seminars. This led to the appearance (in April 1974) of the first publication in Spanish on these techniques, a document which is still being used for teaching purposes. Later, it was the university and the professional associations which, with the support of the State Administration, undertook to provide this instruction. The paper also analyses Spanish experience in the teaching of quality assurance techniques during the period 1975-80, describing the programmes and contents of the courses

  11. 26 CFR 1.801-5 - Total reserves.

    Science.gov (United States)

    2010-04-01

    ... TAXES Life Insurance Companies § 1.801-5 Total reserves. (a) Total reserves defined. For purposes of... its highest aggregate reserve by taking State A's requirement of 10 against its life insurance business and adding it to State B's requirement of 7 against its annuity business. (b) Reserves required by...

  12. High power valve regulated lead-acid batteries for new vehicle requirements

    Science.gov (United States)

    Trinidad, Francisco; Sáez, Francisco; Valenciano, Jesús

    The performance of high power VRLA ORBITAL™ batteries is presented. These batteries have been designed with isolated cylindrical cells, providing high reliability to the recombination process, while maintaining, at the same time, a very high compression (>80 kPa) over the life of the battery. Hence, the resulting VRLA modules combine a high rate capability with a very good cycle performance. Two different electrochemically active material compositions have been developed: high porosity and low porosity for starting and deep cycle applications, respectively (depending on the power demand and depth of discharge). Although, the initial performance of the starting version is higher, after a few cycles the active material of the deep cycle version is fully developed, and this achieves the same high rate capability. Both types are capable of supplying the necessary reliability for cranking at the lowest temperature (-40°C). Specific power of over 500 W/kg is achievable at a much lower cost than for nickel-metal hydride systems. Apart from the initial performance, an impressive behaviour of the cycling version has been found in deep cycle applications, due to the highly compressed and high density active material. When submitted to continuous discharge-charge cycles at 75% (IEC 896-2 specification) and 100% (BCI deep cycle) DoD, it has been found that the batteries are still healthy after more than 1000 and 700 cycles, respectively. However, it has been proven that the application of an IUi algorithm (up to 110% of overcharging) with a small constant current charging period at the end of the charge is absolutely necessary to achieve the above results. Without the final boosting period, the cycle life of the battery could be substantially shortened. The high specific power and reliability observed in the tests carried out, would allow ORBITAL™ batteries to comply with the more demanding requirements that are being introduced in conventional and future hybrid electric

  13. Economic requirements for competitive laser fusion power production

    International Nuclear Information System (INIS)

    Hogan, W.J.; Meier, W.R.

    1986-01-01

    An economic model of a laser fusion commercial power plant is used to identify the design and operating regimes of the driver, target and reaction chamber that will result in economic competitiveness with future fission and coal plants. The authors find that, for a plant with a net power of 1 GW/sub e/, the cost of the driver must be less than $0.4 to 0.6 B, and the recirculating power fraction must be less than 25%. Target gain improvements at low driver energy are the most beneficial but also the most difficult to achieve. The optimal driver energy decreases with increasing target technology. The sensitivity of the cost of electricity to variations in cost and performance parameters decreases with increasing target technology. If chamber pulse rates of a few Hz can be achieved, then gains of 80-100 are sufficient, and higher pulse rates do not help much. Economic competitiveness becomes more difficult with decreasing plant size. Finally, decreasing the cost of the balance of plant has the greatest beneficial effect on economic competitiveness

  14. Total energy analysis of nuclear and fossil fueled power plants

    International Nuclear Information System (INIS)

    Franklin, W.D.; Mutsakis, M.; Ort, R.G.

    1971-01-01

    The overall thermal efficiencies of electrical power generation were determined for Liquid Metal Fast Breeder, High Temperature Gas Cooled, Boiling Water, and Pressurized Water Reactors and for coal-, oil-, and gas-fired systems. All important energy consuming steps from mining through processing, transporting, and reprocessing the fuels were included in the energy balance along with electrical transmission and thermal losses and energy expenditures for pollution abatement. The results of these studies show that the overall fuel cycle efficiency of the light water nuclear fueled reactors is less than the efficiency of modern fossil fuel cycles. However, the nuclear fuel cycle based on the fast breeder reactors should produce power more efficiently than the most modern supercritical fossil fuel cycles. The high temperature gas cooled reactor has a cycle efficiency comparable to the supercritical coal fuel cycle

  15. Impact of Total Ionizing Dose Radiation Testing and Long-Term Thermal Cycling on the Operation of CMF20120D Silicon Carbide Power MOSFET

    Science.gov (United States)

    Patterson, Richard L.; Scheidegger, Robert J.; Lauenstein, Jean-Marie; Casey, Megan; Scheick, Leif; Hammoud, Ahmad

    2013-01-01

    Power systems designed for use in NASA space missions are required to work reliably under harsh conditions including radiation, thermal cycling, and extreme temperature exposures. Silicon carbide devices show great promise for use in future power electronics systems, but information pertaining to performance of the devices in the space environment is very scarce. A silicon carbide N-channel enhancement-mode power MOSFET called the CMF20120 is of interest for use in space environments. Samples of the device were exposed to radiation followed by long-term thermal cycling to address their reliability for use in space applications. The results of the experimental work are presentd and discussed.

  16. Standby-Loss Elimination in Server Power Supply

    Directory of Open Access Journals (Sweden)

    Jong-Woo Kim

    2017-07-01

    Full Text Available In a server power system, a standby converter is required in order to provide the standby output, monitor the system’s status, and communicate with the server power system. Since these functions are always required, losses from the standby converter are produced even though the system operates in normal mode. For these reasons, the losses deteriorate the total efficiency of the system. In this paper, a new structure is proposed to eliminate the losses from the standby converter of a server power supply. The key feature of the proposed structure is that the main direct current (DC/DC converter substitutes all of the output power of the standby converter, and the standby converter is turned off in normal mode. With the proposed structure, the losses from the standby converter can be eliminated in normal mode, and this leads to a higher efficiency in overall load conditions. Although the structure has been proposed in the previous work, very important issues such as a steady state analysis, the transient responses, and how to control the standby converter are not discussed. This paper presents these issues further. The feasibility of the proposed structure has been verified with 400 V link voltage, 12 V/62.5 A main output, and a 12 V/2.1 A standby output server power system.

  17. Selected financial and operating ratios of public power systems

    International Nuclear Information System (INIS)

    Moody, D.

    1993-01-01

    In 1992, the American Public Power Association published its fourth report on financial and operating ratios. Based on 1990 data for the largest public power distribution systems, the report examined 21 categories of ratio indicators that can be used by public power distribution systems to assess their performance relative to the utilities of of comparable size and in the same geographic region. The 394 utilities summarized in the report are those that are required to file financial statements with the Energy Information Administration (EIA). Ratios were calculated from financial and operating data reported by utilities to the EIA. Data are presented for the following ratios: (1) revenue per kW/hr; (2) revenue for customer; (3) debt to total assets; (4) operating ratio; (5) current ratio; (6) times interest earned; (7) net income per revenue dollar; (8) uncollectible accounts per revenue dollar; (9) retail MW hr sales per manpower generation employee; (10) retail customers per nonpower generation employee; (11) total operation and maintenane expense per kW hr sold; (12) total operation and maintenance expense per retail customer; (13) total power supply expense kW hr sold; (14) purchased power cost per kW hr; (15) production expense per not kW hr; (16) retail customers for with reader; (17) distribution operation and maintenance expenses per retail customer; (18) distribution operation and maintenance expenses per circuit mile; (19) customer accounting, customer service and sales expenses per retail customers; (20) administration and general expenses per retail customer; (21) labor expense per worker-hour; (22) OSHA incidence rate; and (23) the system average interruptible duration index

  18. Fuel-cycle financing, capital requirements and sources of funds

    International Nuclear Information System (INIS)

    Manderbach, R.W.

    1977-01-01

    An issue of global importance today is the economic case fro nuclear power and the conservation of precious fossil resources. An important question is whether sufficient financial resources can be attracted to the nuclear industry in order to develop a complete fuel-cycle industry capable of meeting the requirements of a global nuclear power industry. Future growth of the nuclear power industry will depend largely on the timely development of a private competitive industry covering the total fuel cycle. The report of the Edison Electric Institute on Nuclear Fuels Supply estimates that by 1985 initial capital investmentor in the nuclear fuel cycle will total US$15x10 9 and by the year 2000, US$60x10 9 will be required. Although the amount of funding projected is manageable from a global availability standpoint, there is a hesitancy to commit financial resources to certain segments of the fuel cycle, because of the many unresolved problems in connection with the nuclear industry - uncertainty regarding local and international governmental regulations and legislation, environmental and alternative technological considerations coupled with the substantial long-term capital commitments needed in each of the several segments of the processes. Activities associated with the nuclear fuel cycle have unique investment requirements, which are needed in many diverse unrelated fields such as resource development and high technology process. This paper examines sources of capital on a national scale, such as net earnings, depreciation, capital market and public subsidies; and, in the broader context, capital investments in highly industrialized and developing countries. Possible areas of government guarantees and financing; and the situation on financing fuel-cycle projects in the USA and in other countries is also discussed. Comments are included on the money market and investment climate in developing countries, particularly regarding the development of uranium resources

  19. Empirical Information Metrics for Prediction Power and Experiment Planning

    Directory of Open Access Journals (Sweden)

    Christopher Lee

    2011-01-01

    Full Text Available In principle, information theory could provide useful metrics for statistical inference. In practice this is impeded by divergent assumptions: Information theory assumes the joint distribution of variables of interest is known, whereas in statistical inference it is hidden and is the goal of inference. To integrate these approaches we note a common theme they share, namely the measurement of prediction power. We generalize this concept as an information metric, subject to several requirements: Calculation of the metric must be objective or model-free; unbiased; convergent; probabilistically bounded; and low in computational complexity. Unfortunately, widely used model selection metrics such as Maximum Likelihood, the Akaike Information Criterion and Bayesian Information Criterion do not necessarily meet all these requirements. We define four distinct empirical information metrics measured via sampling, with explicit Law of Large Numbers convergence guarantees, which meet these requirements: Ie, the empirical information, a measure of average prediction power; Ib, the overfitting bias information, which measures selection bias in the modeling procedure; Ip, the potential information, which measures the total remaining information in the observations not yet discovered by the model; and Im, the model information, which measures the model’s extrapolation prediction power. Finally, we show that Ip + Ie, Ip + Im, and Ie — Im are fixed constants for a given observed dataset (i.e. prediction target, independent of the model, and thus represent a fundamental subdivision of the total information contained in the observations. We discuss the application of these metrics to modeling and experiment planning.    

  20. Conceptual design of a laser fusion power plant. Part I. An integrated facility

    International Nuclear Information System (INIS)

    1981-07-01

    This study is a new preliminary conceptual design and economic analysis of an inertial confinement fusion (ICF) power plant performed by Bechtel under the direction of Lawrence Livermore National Laboratory (LLNL). The purpose of a new conceptual design is to examine alternatives to the LLNL HYLIFE power plant and to incorporate information from the recent liquid metal cooled power plant conceptual design study (CDS) into the reactor system and balance of plant design. A key issue in the design of a laser fusion power plant is the degree of symmetry in the illumination of the target that will be required for a proper burn. Because this matter is expected to remain unresolved for some time, another purpose of this study is to determine the effect of symmetry requirements on the total plant size, layout, and cost

  1. Fracture toughness requirements of reactor vessel material in evaluation of the safety analysis report of nuclear power plants

    International Nuclear Information System (INIS)

    Widia Lastana Istanto

    2011-01-01

    Fracture toughness requirements of reactor vessel material that must be met by applicants for nuclear power plants construction permit has been investigated in this paper. The fracture toughness should be described in the Safety Analysis Reports (SARs) document that will be evaluated by the Nuclear Energy Regulatory Agency (BAPETEN). Because BAPETEN does not have a regulations or standards/codes regarding the material used for the reactor vessel, especially in the fracture toughness requirements, then the acceptance criteria that applied to evaluate the fracture toughness of reactor vessel material refers to the regulations/provisions from the countries that have been experienced in the operation of nuclear power plants, such as from the United States, Japan and Korea. Regulations and standards used are 10 CFR Part 50, ASME and ASTM. Fracture toughness of reactor vessel materials are evaluated to ensure compliance of the requirements and provisions of the Regulatory Body and the applicable standards, such as ASME or ASTM, in order to assure a reliability and integrity of the reactor vessels as well as providing an adequate safety margin during the operation, testing, maintenance, and postulated accident conditions over the reactor vessel lifetime. (author)

  2. The Effect of Aortic Compliance on Left Ventricular Power Requirement

    Science.gov (United States)

    Pahlevan, Niema; Gharib, Morteza

    2009-11-01

    Aortic compliance depends on both geometry and mechanical properties of the aorta. Reduction in arterial compliance has been associated with aging, smoking, and multiple cardiovascular diseases. Increased stiffness of the aorta affects the wave dynamics in the aorta by increasing both pulse pressure amplitude and wave speed. We hypothesized that decreased aortic compliance leads to an increased left ventricular power requirement for a fixed cardiac output due to altered pulse pressure and pulse wave velocity. We used a computational approach using the finite element method for solid and fluid domains coupled to each other by using the direct coupling method. A nonlinear material model was used for the solid wall. The fluid flow model was considered to be Newtonian, incompressible, and laminar. The simulation was performed for a heart rate of 75 beats per minute for six different compliances while keeping the cardiac output and the peripheral resistance constant. The results show a trend towards increased left ventricular energy expenditure per cycle with decreased compliance. The relevance of these findings to clinical observations will be discussed.

  3. Power requirements reducing of FBG based all-optical switching

    Science.gov (United States)

    Scholtz, Ľubomír.; Solanská, Michaela; Ladányi, Libor; Müllerová, Jarmila

    2017-12-01

    Although Fiber Bragg gratings (FBGs) are well known devices, their using as all-optical switching elements has been still examined. Current research is focused on optimization of their properties for their using in future all-optical networks. The main problem are high switching intensities needed for achieving the changes of the transmission state. Over several years switching intensities have been reduced from hundreds of GW/cm2 to tens of MW/cm2 by selecting appropriate gratings and signal parameters or using suitable materials. Two principal nonlinear effects with similar power requirements can result in the bistable transmission/reflection of an input optical pulse. In the self-phase modulation (SPM) regime switching is achieved by the intense probe pulse itself. Using cross-phase modulation (XPM) a strong pump alters the FBG refractive index experienced by a weak probe pulse. As a result of this the detuning of the probe pulse from the center of the photonic band gap occurs. Using of XPM the effect of modulation instability is reduced. Modulation instability which is the main SPM degradation mechanism. We focused on nonlinear FBGs based on chalcogenide glasses which are very often used in various applications. Thanks to high nonlinear parameters chalcogenide glasses are suitable candidates for reducing switching intensities of nonlinear FBGs.

  4. Nuclear power in the South Korea

    International Nuclear Information System (INIS)

    Molodtsov, S.D.

    1988-01-01

    Data on the state of nuclear power in the South Korea are presented. In the end of 1987 7 power units with 5380 MW total power were in operation in the South Korea. The share of NPP capacity was equal to 26% of the total electric power plant capacity of the country. The cost of NPP power production was equal to 2.2 cent (kw.h). The total established NPP capacity should achieve 7.3 GW by 1990, and exceed 9 GW by 2000

  5. Rest Interval Required for Power Training With Power Load in the Bench Press Throw Exercise.

    Science.gov (United States)

    Hernández Davó, Jose L; Solana, Rafael Sabido; Sarabia Marín, Jose M; Fernández Fernández, Jaime; Moya Ramón, Manuel

    2016-05-01

    This study aimed to test the influence of various rest interval (RI) durations used between sets on power output performance and physiological and perceptual variables during a strength training session using 40% of the 1 repetition maximum (1RM) in the bench press throw exercise. Thirty-one college students (18 males and 13 females) took part in the study. The experimental protocol consists of 5 sets of 8 repetitions of the bench press throw exercise with a load representing 40% of 1RM. Subjects performed the experimental protocol on 3 different occasions, differing by the RI between sets (1, 2, or 3 minutes). During the sessions, power data (mean power and peak power), physiological (lactate concentration [La]) and perceptual (rating of perceived exertion) variables were measured. In addition, delayed onset muscular soreness was reported 24 and 48 hours after the training session. One-way repeated-measures analysis of variance showed that 1-minute RI entailed higher power decreases and greater increases in values of physiological and perceptual variables compared with both 2- and 3-minute RIs. Nevertheless, no differences were found between 2- and 3-minute RIs. Therefore, this study showed that, when training with 40% of 1RM in the bench press throw exercise, a 2-minute RI between sets can be enough to avoid significant decreases in power output. Consequently, training sessions' duration could be reduced without causing excessive fatigue, allowing additional time to focus on other conditioning priorities.

  6. Total: overview of the 2002 financial year

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    In a globally less favourable environment than 2001, Total company (the former 'TotalFinaElf') succeeded in limiting the decay of its results thanks to the increase of its hydrocarbons production which reached the record level of 10% and to the implementation of its synergy and productivity programs. The three activity sectors of the group are: the upstream (exploration, production of hydrocarbons, gas electric power and other energies), the downstream (refining, distribution of petroleum products, special products, trading and shipping of crudes and products), and the chemistry (basic chemistry and big polymers, intermediate and performance polymers, special products). This article details the 2002 results of the group for the three sectors: upstream (exploration and development, reserves, production, natural gas sales), gas and electric power integration (Europe, Americas, Asia), electric power and cogeneration. (J.S.)

  7. An Ultra-Low Power CMOS Image Sensor with On-Chip Energy Harvesting and Power Management Capability

    Directory of Open Access Journals (Sweden)

    Ismail Cevik

    2015-03-01

    Full Text Available An ultra-low power CMOS image sensor with on-chip energy harvesting and power management capability is introduced in this paper. The photodiode pixel array can not only capture images but also harvest solar energy. As such, the CMOS image sensor chip is able to switch between imaging and harvesting modes towards self-power operation. Moreover, an on-chip maximum power point tracking (MPPT-based power management system (PMS is designed for the dual-mode image sensor to further improve the energy efficiency. A new isolated P-well energy harvesting and imaging (EHI pixel with very high fill factor is introduced. Several ultra-low power design techniques such as reset and select boosting techniques have been utilized to maintain a wide pixel dynamic range. The chip was designed and fabricated in a 1.8 V, 1P6M 0.18 µm CMOS process. Total power consumption of the imager is 6.53 µW for a 96 × 96 pixel array with 1 V supply and 5 fps frame rate. Up to 30 μW of power could be generated by the new EHI pixels. The PMS is capable of providing 3× the power required during imaging mode with 50% efficiency allowing energy autonomous operation with a 72.5% duty cycle.

  8. Simulation of RF power and multi-cusp magnetic field requirement for H{sup −} ion sources

    Energy Technology Data Exchange (ETDEWEB)

    Pathak, Manish [Ion Source Lab., Proton Linac & Superconducting Cavities Division, Raja Ramanna Centre for Advanced Technology, Indore, Madhya Pradesh 452013 (India); Senecha, V.K., E-mail: kumarvsen@gmail.com [Ion Source Lab., Proton Linac & Superconducting Cavities Division, Raja Ramanna Centre for Advanced Technology, Indore, Madhya Pradesh 452013 (India); Homi Bhabha National Institute, Raja Ramanna Centre for Advanced Technology, Indore, Madhya Pradesh 452013 (India); Kumar, Rajnish; Ghodke, Dharmraj V. [Ion Source Lab., Proton Linac & Superconducting Cavities Division, Raja Ramanna Centre for Advanced Technology, Indore, Madhya Pradesh 452013 (India)

    2016-12-01

    A computer simulation study for multi-cusp RF based H{sup −} ion source has been carried out using energy and particle balance equation for inductively coupled uniformly dense plasma considering sheath formation near the boundary wall of the plasma chamber for RF ion source used as high current injector for 1 Gev H{sup −} Linac project for SNS applications. The average reaction rates for different reactions responsible for H{sup −} ion production and destruction have been considered in the simulation model. The RF power requirement for the caesium free H{sup -} ion source for a maximum possible H{sup −} ion beam current has been derived by evaluating the required current and RF voltage fed to the coil antenna using transformer model for Inductively Coupled Plasma (ICP). Different parameters of RF based H{sup −} ion source like excited hydrogen molecular density, H{sup −} ion density, RF voltage and current of RF antenna have been calculated through simulations in the presence and absence of multicusp magnetic field to distinctly observe the effect of multicusp field. The RF power evaluated for different H{sup −} ion current values have been compared with the experimental reported results showing reasonably good agreement considering the fact that some RF power will be reflected from the plasma medium. The results obtained have helped in understanding the optimum field strength and field free regions suitable for volume emission based H{sup −} ion sources. The compact RF ion source exhibits nearly 6 times better efficiency compare to large diameter ion source.

  9. Substantial reductions of input energy and peak power requirements in targets for heavy ion fusion

    International Nuclear Information System (INIS)

    Mark, J.W.K.; Pan, Y.L.

    1986-01-01

    Two ways of reducing the requirements of the heavy ion driver for inertial confinement fusion (ICF) target implosion are described. Compared to estimates of target gain not using these methods, the target input energy and peak power may be reduced by about a factor of two with the use of the hybrid-implosion concept. Another factor of two reduction in input energy may be obtained with the use of spin-polarized DT fuel in the ICF target

  10. Demands and conditions of nuclear power development in Russia

    International Nuclear Information System (INIS)

    Sidorenko, V.A.

    1995-01-01

    A reliable power supply is necessary for Russia to find its way out of the present crisis and to develop its economy. Although there are considerable fossil fuel resources in Russia, they are not sufficient to meet future power demands. Forecasts by specialists indicate that about 30% of the necessary increase in annual electricity production should be covered until the year 2010 by new nuclear power plants (NPPs). Also, by that time, all outdated nuclear power units should be replaced by new plants of more than 8 GW capacity. The total NPP capacity in Russia should be increased until 2010 by 50-70%, thus providing the basis for further development of nuclear power, with the aim of reaching 25% of the total electricity generation before 2015. Safety assurance of operational NPPs is a major prerequisite for nuclear power development, and measures for improving safety are being implemented. New designs of power units are being developed, in accordance with modern requirements and safety standards, and the start of construction of these units is planned for the end of this decade. The economic parameters of NPPs situated in the European part of Russia are better than those of coal and gas fuelled power plants. The improved safety of NPPs, the implementation of measures for processing and storage of radioactive wastes, and economic arguments are gradually changing the negative attitude of the population to nuclear power. Extended international co-operation is a further important factor, giving additional assurances of successful and safe nuclear power development in Russia. (author). 1 tab

  11. Design of an AC/DC power supply for telecom applications

    Energy Technology Data Exchange (ETDEWEB)

    Suntio, T.; Vallittu, P.; Laurinen, T.; Ikonen, M. [Efore Oy, Espoo (Finland)

    1997-12-31

    Typical Telecom uninterruptible power supply system (UPS) comprises of parallel connected rectifiers and storage batteries supplying DC power for Telecom switching systems on fixed or mobile telephone networks. The requirement is most often of total uninterruptibility meaning high reliability and availability performance as a vital design and development goal. The Telecom systems must also meet stringent noise emission and immunity requirements stipulated by EMC and Low Voltage Directives, European Telecommunications Standard Institute (ETSI) as well as other global and local standards depending on the area they are to be used. This paper will describe in practice the vital features the rectifiers should contain as well as presents results from a practical equipment of 48 V, 500 W. (orig.) 27 refs.

  12. Total quality drives nuclear plant improvements

    International Nuclear Information System (INIS)

    Richey, R.B.

    1991-01-01

    Total quality (TQ) at Carolina Power and Light (CP and L) is fulfilling a 1985 vision of Sherwood H. Smith, Jr., CP and L's chairman, president, and chief executive officer. The TQ concept has provided a way for employees to align their creative energies toward meeting the business needs of the company. Throughout CP and L, TQ has been recognized as the vehicle for reducing operating costs and improving customer satisfaction. Within the nuclear organization, application of the TQ process has helped to improve communications, resolve challenges, and provide more consistent work practices among CP and L's three nuclear plants. Total quality was introduced from the top down, with initial benefits coming from team interactions. Senior management at CP and L defined the corporate expectations and outlined the training requirements for implementing TQ. Management staffs at each organizational level became steering committees for TQ team activities within their departments. Teams of employees most knowledgeable about a given work area were empowered to solve problems or overcome obstacles related to that work area. Employees learned to become better team players and to appreciate the quality of decisions reached through group consensus. Now, formalized methods that started TQ are becoming part of the day-to-day work ethic

  13. Magnet power supplies for the DORIS intersecting storage ring

    International Nuclear Information System (INIS)

    Narciss, H.; Hrabal, D.; Schlueter, W.

    1975-01-01

    Extremely precise, stable magnetic fields are required for guiding, deflecting and focussing electron and positron beams in the DORIS intersecting storage ring of the German Electron Synchrotron DESY. For the magnets producing these fields, Siemens has supplied a total of 29 precision-controlled power supplies in 17 different versions ranging from 1.5 kW to 4.9 kW. (orig.) [de

  14. The basic concepts of a fuel-power detector for nuclear power reactors

    International Nuclear Information System (INIS)

    Lynch, G.F.

    1979-01-01

    Fuel power is proposed as an alternative to neutron or gamma-ray flux for control and safety functions in CANDU power reactors. To satisfy in-core power monitoring requirements, a detector whose dynamic response corresponds to the heat production rate in the fuel is needed. This report explores the concept of tailoring the response characteristics of a mixed-response self-powered flux detector to match the requirements of an ideal fuel-power detector. (author)

  15. Nuclear power in Japan in 1987

    International Nuclear Information System (INIS)

    Molodtsov, S.D.

    1989-01-01

    Data on the development level of nuclear power in Japan as of 1988 beginning are presented. Total registed electric power of 36 nuclear power units under operation constituted 28046 MW. 13 power units with 12268 MW total power are under construction. In 1987 188.4 TWH electric power was generated at the Japanese NPPs, it constituted 31.7% of total electric power generation. About 360 bil. yens were assigned from the state budget to further development of nuclear power engineering. Efforts to create the improved BWR type reactor, as well as, scientific and research efforts on the development of fast breeder reactors, improvement of uranium enrichment and radioactive waste storage are carried out. It is expected that share of nuclear power in electric power generation in Japan will reach 40% to the beginning of the 21-th century

  16. Implications of ITER requirements on R and D of RF heating and current drive systems

    International Nuclear Information System (INIS)

    Bosia, G.; Agarici, G.; Beaumont, B.

    2003-01-01

    Heating and Current Drive (H and CD) systems have an essential role in ITER-FEAT operation, as all phases of ITER operation are driven and controlled by the auxiliary power flow. The RF (Electron Cyclotron and Ion Cyclotron) systems, planned to contribute for ∼ 60% of the total auxiliary power (72 MW), with Lower Hybrid used for the specialised function of current drive in the extended performance phase (20 MW), are at different level of technology development. All systems, need a significant development in order to meet ITER operation requirements In this paper these requirements are reviewed and CEA proposals for the development of the Ion cyclotron system presented. (author)

  17. Total phenolics and total flavonoids in selected Indian medicinal plants.

    Science.gov (United States)

    Sulaiman, C T; Balachandran, Indira

    2012-05-01

    Plant phenolics and flavonoids have a powerful biological activity, which outlines the necessity of their determination. The phenolics and flavonoids content of 20 medicinal plants were determined in the present investigation. The phenolic content was determined by using Folin-Ciocalteu assay. The total flavonoids were measured spectrophotometrically by using the aluminium chloride colorimetric assay. The results showed that the family Mimosaceae is the richest source of phenolics, (Acacia nilotica: 80.63 mg gallic acid equivalents, Acacia catechu 78.12 mg gallic acid equivalents, Albizia lebbeck 66.23 mg gallic acid equivalents). The highest total flavonoid content was revealed in Senna tora which belongs to the family Caesalpiniaceae. The present study also shows the ratio of flavonoids to the phenolics in each sample for their specificity.

  18. Report on achievements in fiscal 1999 of New Sunshine Project. Development of superconductor power applied technologies. Research on total system; 1999 nendo chodendo denryoku oyo gijutsu kaihatsu gyomu seika hokokusho. Total system nado no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    To deal effectively with problems being actualized in electric power systems, it is necessary to introduce superconductor technologies into power devices, and achieve higher efficiency, density and stability in the power systems. To achieve the goal, development is being made on superconductor power applied technologies, whereas investigative researches are given on the effects of introducing the superconductor power applied devices to proceed the development effectively and smoothly. This project is also given evaluations on its research achievements. In the practical application of superconductor generators, all of the verification tests have been completed, with the model generator system linkage test as the final test. Design and fabrication technologies were established on a 200,000-kW class pilot generator after having gone through analyses made after the tests. Not only having achieved the initial technical value targets, the result presented reliability required for practical use of the superconductor generator, having exceeded the expectation. The research and development of the superconductor generator technologies under this project is concluded successful. The AC superconductor devices were developed by effectively utilizing the results of the leading researches on fundamental technologies for AC superconductor power device technologies as well as other results of the world's highest levels. (NEDO)

  19. Effect of Antihypertensive Therapy on SCORE-Estimated Total Cardiovascular Risk: Results from an Open-Label, Multinational Investigation—The POWER Survey

    Directory of Open Access Journals (Sweden)

    Guy De Backer

    2013-01-01

    Full Text Available Background. High blood pressure is a substantial risk factor for cardiovascular disease. Design & Methods. The Physicians' Observational Work on patient Education according to their vascular Risk (POWER survey was an open-label investigation of eprosartan-based therapy (EBT for control of high blood pressure in primary care centers in 16 countries. A prespecified element of this research was appraisal of the impact of EBT on estimated 10-year risk of a fatal cardiovascular event as determined by the Systematic Coronary Risk Evaluation (SCORE model. Results. SCORE estimates of CVD risk were obtained at baseline from 12,718 patients in 15 countries (6504 men and from 9577 patients at 6 months. During EBT mean (±SD systolic/diastolic blood pressures declined from 160.2 ± 13.7/94.1 ± 9.1 mmHg to 134.5 ± 11.2/81.4 ± 7.4 mmHg. This was accompanied by a 38% reduction in mean SCORE-estimated CVD risk and an improvement in SCORE risk classification of one category or more in 3506 patients (36.6%. Conclusion. Experience in POWER affirms that (a effective pharmacological control of blood pressure is feasible in the primary care setting and is accompanied by a reduction in total CVD risk and (b the SCORE instrument is effective in this setting for the monitoring of total CVD risk.

  20. Effect of Antihypertensive Therapy on SCORE-Estimated Total Cardiovascular Risk: Results from an Open-Label, Multinational Investigation—The POWER Survey

    Science.gov (United States)

    De Backer, Guy; Petrella, Robert J.; Goudev, Assen R.; Radaideh, Ghazi Ahmad; Rynkiewicz, Andrzej; Pathak, Atul

    2013-01-01

    Background. High blood pressure is a substantial risk factor for cardiovascular disease. Design & Methods. The Physicians' Observational Work on patient Education according to their vascular Risk (POWER) survey was an open-label investigation of eprosartan-based therapy (EBT) for control of high blood pressure in primary care centers in 16 countries. A prespecified element of this research was appraisal of the impact of EBT on estimated 10-year risk of a fatal cardiovascular event as determined by the Systematic Coronary Risk Evaluation (SCORE) model. Results. SCORE estimates of CVD risk were obtained at baseline from 12,718 patients in 15 countries (6504 men) and from 9577 patients at 6 months. During EBT mean (±SD) systolic/diastolic blood pressures declined from 160.2 ± 13.7/94.1 ± 9.1 mmHg to 134.5 ± 11.2/81.4 ± 7.4 mmHg. This was accompanied by a 38% reduction in mean SCORE-estimated CVD risk and an improvement in SCORE risk classification of one category or more in 3506 patients (36.6%). Conclusion. Experience in POWER affirms that (a) effective pharmacological control of blood pressure is feasible in the primary care setting and is accompanied by a reduction in total CVD risk and (b) the SCORE instrument is effective in this setting for the monitoring of total CVD risk. PMID:23997946

  1. From the world and asian energy demand and environmental requirement to foresee the prospect of Guangdong nuclear power development

    International Nuclear Information System (INIS)

    Qiu Wenfeng

    1999-01-01

    The world economy development depends on the development of energy resource. The general energy resource which is mainly fossil fuel will bring damage to the global environment. To stop the global environment becoming worse, cleaner energy will be used in the twenty-first century. The situation which the Guangdong economic growth rate is higher than that of inland average will not change in short period. Economic development requires the suitable electric power supply. The foreground of Guangdong electric power development will be hopeful. To develop electric power is to develop coal, oil, gas, nuclear, hydroelectric and the other renewable power. As to Guangdong, because the environmental pollution is quite serious, it is impossible to develop much more coal-fired power plants. Our country is oil net importer, oil-fired power plants are also restricted. It is acceptable to import natural gas in appropriate degree to generate electricity in the near future to improve environment. To develop hydraulic power is more and more difficult in Guangdong. The hydraulic power from the southwest of China is only as the complement of the Guangdong energy resource, and it is impossible to primarily solve the energy shortage problem. Sunlight, wind, ocean power and terrestrial heat etc. are clean renewable energy, but they can't be used as the wholesale stable industry power. So to develop nuclear power is the certain selection to solve the energy shortage problem and reduce the environmental pollution in Guangdong. (author)

  2. Hybrid wind power balance control strategy using thermal power, hydro power and flow batteries

    OpenAIRE

    Gelažanskas, Linas; Baranauskas, Audrius; Gamage, Kelum A.A.; Ažubalis, Mindaugas

    2016-01-01

    The increased number of renewable power plants pose threat to power system balance. Their intermittent nature makes it very difficult to predict power output, thus either additional reserve power plants or new storage and control technologies are required. Traditional spinning reserve cannot fully compensate sudden changes in renewable energy power generation. Using new storage technologies such as flow batteries, it is feasible to balance the variations in power and voltage within very short...

  3. Fuel Cells: Power System Option for Space Research

    Science.gov (United States)

    Shaneeth, M.; Mohanty, Surajeet

    2012-07-01

    Fuel Cells are direct energy conversion devices and, thereby, they deliver electrical energy at very high efficiency levels. Hydrogen and Oxygen gases are electrochemically processed, producing clean electric power with water as the only by product. A typical, Fuel Cell based power system involve a Electrochemical power converter, gas storage and management systems, thermal management systems and relevant control units. While there exists different types of Fuel cells, Proton Exchange Membrane (PEM) Fuel Cells are considered as the most suitable one for portable applications. Generally, Fuel Cells are considered as the primary power system option in space missions requiring high power ( > 5kW) and long durations and also where water is a consumable, such as manned missions. This is primarily due to the advantage that fuel cell based power systems offer, in terms of specific energy. Fuel cells have the potential to attain specific energy > 500Wh/kg, specific power >500W/kg, energy density > 400Whr/L and also power density > 200 W/L. This apart, a fuel cell system operate totally independent of sun light, whereas as battery based system is fully dependent on the same. This uniqueness provides added flexibility and capabilities to the missions and modularity for power system. High power requiring missions involving reusable launch vehicles, manned missions etc are expected to be richly benefited from this. Another potential application of Fuel Cell would be interplanetary exploration. Unpredictable and dusty atmospheres of heavenly bodies limits sun light significantly and there fuel cells of different types, eg, Bio-Fuel Cells, PEMFC, DMFCs would be able to work effectively. Manned or unmanned lunar out post would require continuous power even during extra long lunar nights and high power levels are expected. Regenerative Fuel Cells, a combination of Fuel Cells and Electrolysers, are identified as strong candidate. While application of Fuel Cells in high power

  4. Line voltage distortions due to operation of the power supply devices required for plasma heating and magnetic field generation in the W7X thermonuclear fusion experiment

    International Nuclear Information System (INIS)

    Werner, F.

    1997-03-01

    The operation of the W7-X plasma heating devices requires high voltage DC power supplies with a total electrical power of 40 MVA. For this purpose twelve-pulse AC/DC converters are projected. These converters enforce a non sinusoidal line current, whose harmonics are causing corresponding line voltage distortions. To evaluate the extent of these distortions, the reaction of the harmonic currents on the AC line, is investigated by numerical network analysis. This is done for both, the 20 kV-junction point of the converters and the 110 kV-line terminal of the electricity supply company. Furthermore the design of LC series-resonant circuits, projected for power factor correction and damping of the harmonic content of the line voltage, has been verified. The additional operation of the 1.5 MVA magnet power supplies also contributes, even though to a much smaller extent, to the line voltage distortion. The influence of these twelve-pulse AC/DC converters was investigated too. The numerical calculations have been done with the aid of the network simulation program 'Pspice'. In an equivalent circuit the transmission line network and the transformers are represented by their inductances respectively equivalent inductances. The rectifier units are simulated by a number of current sources, producing the current harmonics in amplitude, frequency and phase. The harmonics amplitudes of the plasma heating power supplies are frequency and phase. The harmonics amplitudes of the plasma heating power supplies are measured values given by the manufacturer. For the magnet power supplies, the harmonics are derived from the theoretical step like I(t) current shape by Fourier series decomposition. Due to the action of the LC circuits the achieved characteristic voltage quality values are far below the permissible values corresponding to the recommendations of VDE 0160. (orig.) [de

  5. Nuclear power's effects on electric rate making

    International Nuclear Information System (INIS)

    Smith, D.S.; Lancaster, A.A.

    1978-01-01

    Government and the electric utility industry are re-evaluating nuclear power's contribution to the total U.S. energy supplies. This article addresses how the recently increased nuclear plant construction and operation costs are translated into the prices that consumers pay for electricity. The electric rates that consumers pay must reflect the costs of producing electricity, as well as the costs of transmission, distribution, metering, and billing. The use of nuclear power for electric production is anticipated to grow rapidly so as to meet a larger portion of our country's electricity needs through the end of the century; so nuclear power costs are expected to be an even larger portion of the total electricity price. There are certain rate-making issues that are actively being discussed in public forums and before state and Federal regulatory bodies. These issues are not unique to nuclear power, but take on added significance when nuclear power is used by utilities to produce electricity because of the technology required and because of the type, timing, and magnitude of the costs involved. These are: (1) inclusion of construction work in progress in the rate base; (2) fuel adjustment clauses and treatment of nuclear fuel cycle costs; (3) treatment of certain taxes under the rate-making method called normalization or deferral accounting (sometimes referred to as ''phantom taxes''); and (4) rate treatment for particular nuclear expense items reflecting costs of delays, plant cancellations, and operational slowdowns

  6. Research on the decomposition model for China’s National Renewable Energy total target

    International Nuclear Information System (INIS)

    Liu, Zhen; Shi, Yuren; Yan, Jianming; Ou, Xunmin; Lieu, Jenny

    2012-01-01

    It is crucial that China’s renewable energy national target in 2020 is effectively decomposed into respective period targets at the provincial level. In order to resolve problems arising from combining the national and local renewable energy development plan, a total target and period target decomposition model of renewable energy is proposed which considers the resource distribution and energy consumption of different provinces as well as the development characteristics of various renewable energy industries. In the model, the total proposed target is comprised of three shares: basic share, fixed share and floating share target. The target distributed for each province is then determined by the preference relation. That is, when total renewable energy target is distributed, the central government is more concerned about resources potential or energy consumption. Additionally, the growth models for various renewable energy industries are presented, and the period targets of renewable energy in various provinces are proposed in line with regional economic development targets. In order to verify whether the energy target can be achieved, only wind power, solar power, and hydropower are considered in this study. To convenient to assess the performance of local government, the two year period is chosen as an evaluation cycle in the paper. The renewable energy targets per two-year period for each province are calculated based on the overall national renewable energy target, energy requirements and resources distribution. Setting provincial period targets will help policy makers to better implement and supervise the overall renewable energy plan. - Highlights: It is very importance that the national target of renewable energy in 2020 can be effectively decomposed into the stages target of various province. In order to resolve the relation the plan between the national and local renewable energy development planning, a total target and phase target decomposition model

  7. Education and training requirements of nuclear power plant personnel

    International Nuclear Information System (INIS)

    Donato, R.; Perlas, C.A.; Conti, E.

    1978-01-01

    This bibliography was compiled by the Scientific Library staff to help in the intensified training program being undertaken by the Philippine Atomic Energy Commission (PAEC) for the nuclear power plant personnel of the Philippines' first nuclear power reactor. This bibliography covers the period 1955 - 1976 of the Nuclear Science Abstracts and is composed of 281 entries. Arrangement of these entries is by broad subject category

  8. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  9. An adaptive wavelet-network model for forecasting daily total solar-radiation

    International Nuclear Information System (INIS)

    Mellit, A.; Benghanem, M.; Kalogirou, S.A.

    2006-01-01

    The combination of wavelet theory and neural networks has lead to the development of wavelet networks. Wavelet-networks are feed-forward networks using wavelets as activation functions. Wavelet-networks have been used successfully in various engineering applications such as classification, identification and control problems. In this paper, the use of adaptive wavelet-network architecture in finding a suitable forecasting model for predicting the daily total solar-radiation is investigated. Total solar-radiation is considered as the most important parameter in the performance prediction of renewable energy systems, particularly in sizing photovoltaic (PV) power systems. For this purpose, daily total solar-radiation data have been recorded during the period extending from 1981 to 2001, by a meteorological station in Algeria. The wavelet-network model has been trained by using either the 19 years of data or one year of the data. In both cases the total solar radiation data corresponding to year 2001 was used for testing the model. The network was trained to accept and handle a number of unusual cases. Results indicate that the model predicts daily total solar-radiation values with a good accuracy of approximately 97% and the mean absolute percentage error is not more than 6%. In addition, the performance of the model was compared with different neural network structures and classical models. Training algorithms for wavelet-networks require smaller numbers of iterations when compared with other neural networks. The model can be used to fill missing data in weather databases. Additionally, the proposed model can be generalized and used in different locations and for other weather data, such as sunshine duration and ambient temperature. Finally, an application using the model for sizing a PV-power system is presented in order to confirm the validity of this model

  10. A superconducting isochronous cyclotron stack as a driver for a thorium-cycle power reactor

    International Nuclear Information System (INIS)

    Kim, G.; May, D.; McIntyre, P.; Sattarov, A.

    2001-01-01

    Designs for thorium-cycle power reactors require a proton driver capable of 1 GeV energy and 10 MW total power. For this purpose we have prepared a preliminary design for the magnetic structure for a stack of 5 super-conducting isochronous cyclotrons, each delivering 2 MW beam power. By achieving the required power with multiple independent apertures rather than pushing beyond currently achieved limits, we hope to arrive at a design that is cost-minimum and reliable. Each sector magnet consists of a flux-coupled stack of cold-iron inserts supported within a single warm-iron, in a fashion inspired by the new Riken heavy-ion cyclotron. We have developed a preliminary field design in which in-plane fields are cancelled in all 5 apertures and the field-map is appropriate for the focusing optics of the sector cyclotron

  11. Working group report on the required atomic database for neutral hydrogen beam penetration in large tokamaks

    International Nuclear Information System (INIS)

    Cox, M.; Boley, C.D.; Janev, R.K.

    1989-01-01

    This report discusses the required atomic database for the physical processes involved in the beam attenuation kinetics, when multistep processes are included, i.e., electron and proton impact processes, impurity-ion impact processes, radiative processes, as well as Lorentz field ionization. It also discusses the required accuracies of different parts of the data base in order to achieve the overall accuracy of about 10 percent that is required for the total beam stopping power cross section. 3 refs

  12. Active power compensator of the current harmonics based on the instantaneous power theory

    Directory of Open Access Journals (Sweden)

    Marian GAICEANU

    2005-12-01

    Full Text Available The quality of the electrical current becomes a major concern. The proliferation of the power electronic converters, which are used extensively to control electrical apparatus in industrial and commercial applications (dc and ac variable speed motor drives, induction furnaces, power line conditioners, and industrial power supplies, is at the origin of the AC current distribution network pollution and the reactive power demand. These power electronic converters typically draw non-sinusoidal currents from the utility, causing interference with adjacent sensitive loads and limit the utilization of the available electrical supply. The quality of the electrical current thus becomes a significant concern for the distributors of energy and their customers. Recent progress as regards technology of the power electronics brings a capacity of compensation and correction of the harmonic distortion generated by the nonlinear loads. In this paper a parallel active filter prototype capable of reducing the total harmonic distortion in the supply for most current source or adjustable speed drive type loads is presented. A 33 kVA active power filter was developed for harmonic and reactive power compensation based on the instantaneous power theory. The active filter configuration requires the measurement of both the load and filter currents. Experimental results from a prototype active power filter confirm the suitability of the proposed approach. The actual 33kVA prototype converter has been built and tested in the SIEI S.p.A. (Italy laboratory under the Marie Curie Post Doctoral research. The active power compensator is controlled by a high performance DSP platform, resulting in the following active filter features: source current reduction up to the 25th harmonic, 10% THD achievable for current source type loads, efficiency above 97%, does not cause resonance with other loads, operation in the presence of unbalanced loads, reactive power and harmonics

  13. Antares laser power amplifier

    International Nuclear Information System (INIS)

    Stine, R.D.; Ross, G.F.; Silvernail, C.

    1979-01-01

    The overall design of the Antares laser power amplifier is discussed. The power amplifier is the last stage of amplification in the 100-kJ Antares laser. In the power amplifier a single, cylindrical, grid-controlle, cold-cathode electron gun is surrounded by 12 large-aperture CO 2 electron-beam sustained laser discharge sectors. Each power amplifier will deliver 18 kJ and the six modules used in Antares will produce the required 100 kJ for delivery to the target. A large-scale interaction between optical, mechanical, and electrical disciplines is required to meet the design objectives. Significant component advances required by the power amplifier design are discussed

  14. Object-Oriented Economic Power Dispatch of Electrical Power System with minimum pollution using a Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    T. Bouktir

    2005-06-01

    Full Text Available This paper presents solution of optimal power flow (OPF problem of electrical power system via a genetic algorithm of real type. The objective is to minimize the total fuel cost of generation and environmental pollution caused by fossil based thermal generating units and also maintain an acceptable system performance in terms of limits on generator real and reactive power outputs, bus voltages, shunt capacitors/reactors, transformers tap-setting and power flow of transmission lines. CPU times can be reduced by decomposing the optimization constraints to active constraints that affect directly the cost function manipulated directly the GA, and passive constraints such as generator bus voltages and transformer tap setting maintained in their soft limits using a conventional constraint load flow. The algorithm was developed in an Object Oriented fashion, in the C++ programming language. This option satisfies the requirements of flexibility, extensibility, maintainability and data integrity. The economic power dispatch is applied to IEEE 30-bus model system (6-generator, 41-line and 20-load. The numerical results have demonstrate the effectiveness of the stochastic search algorithms because its can provide accurate dispatch solutions with reasonable time. Further analyses indicate that this method is effective for large-scale power systems.

  15. New formulas for interferometric crosstalk penalty as a function of total crosstalk power, number of crosstalk contributions and signal extinction ratio

    DEFF Research Database (Denmark)

    Rasmussen, Christian Jørgen; Jeppesen, Palle

    2000-01-01

    Interferometric crosstalk, also called incoherent crosstalk, occurs when reception of a desired signal is disturbed by undesired crosstalk contributions having the same wavelength as the desired signal but independent amplitudes and phases. This crosstalk type is known to be among the most...... destructive phenomena in optical networks owing to its accumulative nature and strong impact on the transmission quality. New formulas state the crosstalk penalty as a function of the total crosstalk power, the number of contributions carrying this power and the signal extinction ratio. We consider both PIN...... and optically preamplified receivers. The authors know of no other published formulas which include the number of crosstalk contributions. The crosstalk penalty formulas are empirical, and they are based on a numerical model. This model is described briefly along with its experimental verification before...

  16. Active power control strategies for inverter-based distributed power generation adapted to grid-fault ride-through requirements

    NARCIS (Netherlands)

    Wang, F.; Duarte, J.L.; Hendrix, M.A.M.

    2009-01-01

    Distributed power generation is expected to deliver power into the grid without interruption during voltage dips. To improve system ride-through capabilities, a generalized active power control strategy is proposed for grid-interfacing inverters. Specifically, a current reference generation strategy

  17. New formulas for interferometric crosstalk penalty as a function of total crosstalk power, number of crosstalk contributions and signal extinction ratio

    OpenAIRE

    Rasmussen, Christian Jørgen; Jeppesen, Palle

    2000-01-01

    Interferometric crosstalk, also called incoherent crosstalk, occurs when reception of a desired signal is disturbed by undesired crosstalk contributions having the same wavelength as the desired signal but independent amplitudes and phases. This crosstalk type is known to be among the most destructive phenomena in optical networks owing to its accumulative nature and strong impact on the transmission quality. New formulas state the crosstalk penalty as a function of the total crosstalk power,...

  18. Advanced power supply and distribution systems for Columbus

    Science.gov (United States)

    Eggers, Gert

    1988-01-01

    The paper describes power supply and distribution systems to be used on unmanned/man-tended Columbus elements, capable of supplying 10 kW to 30 kW to a variety of users in low earth orbits (LEO's). For the definition of the Electrical Power System (EPS) challenging requirements as the provision of high power levels under hard LEO conditions, maintainability, commonality etc. are to be taken into account. These requirements are to be seen in conjunction with the Columbus IOC (initial operational capability) scenario stipulating that EPS hardware shall be used on the Polar Platform, the Pressurized Module attached to the U.S. Space Station and the Man-Tended Free Flier. According to the availability of European technologies, the baseline in the power generation area is a photovoltaic system which provides three regulated main buses (150 V d.c.) to the users. In order to maintain power supply during eclipse phases, nickel hydrogen batteries will be used for energy storage purposes with nickel cadmium as back-up solution. The power distribution system needs special attention. Due to the elevated voltage levels mechanical switch gear cannot be used any longer. It is to be replaced by solid state power controllers (SSPC). Because these devices show a totally different behaviour with regard to conventional relay contacts, new approaches in the area of switching and protection are necessary. In view of the crucial role of this new technology for the realization of medium voltage d.c. systems, it is of great importance for Columbus and, hence will receive adequate consideration in the paper. In order to cater for effective management and control of the power supply and distribution hardware, a so called power system internal data processing assembly (PINDAP) has been introduced in the EPS. PINDAP is the key to reduced dependence on ground stations (alleviated ground support requirements); it keeps crew involvement in the EPS control process to as minimum and provides

  19. FY 1992 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Demonstration test on a methanol reformation type power generation total system; 1992 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Metanoru kaishitsu gata hatsuden total system jissho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    For the promotion of introduction of methanol to oil-fired power plant, based on the results of the element study, operational study was conducted of a 1,000kW class total system plant for which each of the elements was combined, and the FY 1992 results were summarized. In the operational study, data on various kinds of operational study were sampled of each of the simple cycle/regeneration cycle of liquid methanol and simple cycle/regeneration cycle of gas methanol. As to the reformed gas/water injection/regeneration cycle, all functions as a total system plant worked normally, and it was confirmed that the reformed gas/water injection/regeneration cycle operation could be made possible. Besides, the following were conducted: confirmation test on the performance of the developmental catalyst used in the operational study by bench-scale test device, trial operation for adjustment of gas turbine and combustion study such as the performance test in each cycle, manufacture/study of catalyst for the total system, study for longevity of catalyst for the total system, etc. (NEDO)

  20. IRIS Nuclear Power Plant design

    International Nuclear Information System (INIS)

    Carelli, M. D.; Cobian, J.

    2002-01-01

    IRIS(International Reactor Innovative and Secure) is a novel light water reactor with a modular, integral primary system configuration. This concept, initially developed in response to the first NERI solicitation, is now being pursued by an international consortium of 20 participants from seven countries. IRIS is designed to satisfy the four key requirements for Generation IV systems: enhanced safety, improved economics, proliferation resistance and waste minimization. Its main features are: small-to-medium power (100-335 MWe/module); long life core 5 to 10 years) without shuffling or refueling; optimized maintenance with repair shutdown intervals of a least four years; simplified compact design with the primary vessel housing steam generators, pressurizer and pumps; safety by design where accidents are positively eliminated by design rather than engineering to cope with their consequences; loss of coolant accidents of any size and loss of low accidents are eliminated as major safety concerns; estimated power generation total cost is projected to be competitive with other power options. IRIS is one of four new reactor designs currently under NRC review. Projected schedule calls for design certification by 2008 and being ready for deployment by 2001 or later. This rather short schedule is made possible by the fact that IRIS is based on proven light water technology and new technology development is not required. (Author)

  1. Photovoltaic array for Martian surface power

    Science.gov (United States)

    Appelbaum, J.; Landis, G. A.

    1992-01-01

    Missions to Mars will require electric power. A leading candidate for providing power is solar power produced by photovoltaic arrays. To design such a power system, detailed information on solar-radiation availability on the Martian surface is necessary. The variation of the solar radiation on the Martian surface is governed by three factors: (1) variation in Mars-Sun distance; (2) variation in solar zenith angle due to Martian season and time of day; and (3) dust in the Martian atmosphere. A major concern is the dust storms, which occur on both local and global scales. However, there is still appreciable diffuse sunlight available even at high opacity, so that solar array operation is still possible. Typical results for tracking solar collectors are also shown and compared to the fixed collectors. During the Northern Hemisphere spring and summer the isolation is relatively high, 2-5 kW-hr/sq m-day, due to the low optical depth of the Martian atmosphere. These seasons, totalling a full terrestrial year, are the likely ones during which manned mission will be carried out.

  2. Market power monitoring and mitigation in the US wholesale power markets

    Energy Technology Data Exchange (ETDEWEB)

    Helman, Udi [Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 20426 (United States)

    2006-05-15

    Under current statutory requirements, the Federal Energy Regulatory Commission (FERC) must ensure that prices in US wholesale power markets are 'just and reasonable'. This has been interpreted by the agency and the courts as requiring the monitoring and mitigation of undue market power. This paper focuses on generation market power. Prior to electricity sector restructuring, wholesale bilateral power trading took place among vertically integrated monopoly utilities trading at the margin or between small independent producers and the utilities. Under those conditions, the authorization of trading at market prices, called 'market-based rates', required only that the generation supplier pass a simple market share screen for market power. As restructuring unfolded, and market conditions changed, there has been a steady evolution in FERC's market power mitigation rules, encompassing (a) changes in the market power assessment required for granting market-based rates and related methods for merger approval, and (b) development and refinement of new techniques for screening and mitigating offers into the organized day-ahead and real-time markets operated by Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs). This paper reviews these changes to date, as FERC continues to clarify its approved rules and procedures. It also examines recent methods for quantitative market power analysis that could augment current procedures or supplant them, as found appropriate. (author)

  3. Power Management Integrated Circuit for Indoor Photovoltaic Energy Harvesting System

    Science.gov (United States)

    Jain, Vipul

    In today's world, power dissipation is a main concern for battery operated mobile devices. Key design decisions are being governed by power rather than area/delay because power requirements are growing more stringent every year. Hence, a hybrid power management system is proposed, which uses both a solar panel to harvest energy from indoor lighting and a battery to power the load. The system tracks the maximum power point of the solar panel and regulates the battery and microcontroller output load voltages through the use of an on-chip switched-capacitor DC-DC converter. System performance is verified through simulation at the 180nm technology node and is made to be integrated on-chip with 0.25 second startup time, 79% efficiency, --8/+14% ripple on the load, an average 1micro A of quiescent current (3.7micro W of power) and total on-chip area of 1.8mm2 .

  4. Generic study on the design and operation of high power targets

    Directory of Open Access Journals (Sweden)

    A. Ahmad

    2014-02-01

    Full Text Available With the move towards beam power in the range of 1–10 MW, a thorough understanding of the response of target materials and auxiliary systems to high power densities and intense radiation fields is required. This paper provides insight into three major aspects related to the design and operation of high power solid targets: thermal stresses, coolant performance, and radiation damage. Where appropriate, a figure-of-merit approach is followed to facilitate the comparison between different target or coolant candidates. The section on radiation damage reports total and spatial variations of displacement-per-atom and helium production levels in different target materials.

  5. Global Status of Nuclear Power: Prospects and Challenges

    International Nuclear Information System (INIS)

    Tayobeka, B. M.

    2010-01-01

    Global energy requirements and the share of electricity in total energy consumption are increasing rapidly, and the contribution of nuclear power is projected to increase significantly. Out of the 29 countries currently using nuclear power for electricity generation, 22 intend to allow new plants to be built, and, of those, the majority are actively supporting the increased use of nuclear power, some by providing incentives. Most of these countries are expected to build reactors with a generating capacity of over 1000 MW(e). Only three countries continue to have a policy to phase out the use of nuclear energy in the future by not replacing existing operating nuclear power plants and with no consideration of the option of new nuclear plants.In addition, a growing number of countries are expressing interest in introducing nuclear power. Of the more than 60 countries that have expressed such an interest in recent years, over 20 are actively considering nuclear power programmes to meet their energy needs and the others have expressed interest in understanding the issues associated with the introduction of nuclear power.The drivers for rising expectations for nuclear power include: growing energy demand, concern over national energy supply security, the increasingly volatile price of fossil fuels and global environmental concerns. The drivers appear to be the same for countries expanding existing nuclear programmes and those seeking to introduce programmes. The projections made by different international organizations indicate a significant growth in the use of nuclear power. The IAEA projections indicate a world total for nuclear electrical generating capacity of between 445 and 543 GW(e) by 2020 and between 511 and 807 GW(e) by 2030. This paper takes a detailed look into the global status of nuclear power, highlighting challenges and prospects of the technology going into the next century.(author).

  6. Impacts of Renewable Energy Quota System on China's Future Power Sector

    DEFF Research Database (Denmark)

    Xiong, Weiming; Zhang, Da; Mischke, Peggy

    2014-01-01

    As the biggest carbon emitting sector which produces 44% of current national carbon emission in China, the coal-dominated power sector has a tremendous potential for CO2 mitigation in the next two decades. Renewable energy quota system is currently discussed as a potential future policy instrument...... for the power sector, which requires certain fraction of renewable energy in total power generation for each province and grid zone. The quantitative studies on renewable energy quota for China are still very limited. Based on a least-cost and technology-rich power generation and transmission expansion model...... for China, this study examines the impacts of renewable energy quota system and carbon cap policy instruments on the future Chinese power sector. Various scenarios are examined toward 2030 and their future power generation mix, capacity installations and carbon emission are discussed. This study concludes...

  7. Allocation of synchronous condensers for restoration of system short-circuit power

    DEFF Research Database (Denmark)

    Marrazi, Emanuel; Yang, Guangya; Weinreich-Jensen, Peter

    2017-01-01

    Modern power systems, employing an increasing number of converter-based renewable energy sources (RES) and decreasing the usage of conventional power plants, are leading to lower levels of short-circuit power and rotational inertia. A solution to this is the employment of synchronous condensers...... in the grid, in order to provide sufficient short-circuit power. This results in the increase of the short-circuit ratio (SCR) at transmission system bus-bars serving as points of interconnection (POI) to renewable generation. Evaluation of the required capacity and grid-location of the synchronous condensers...... by renewable generation. Total cost of synchronous condenser installations in the system is minimized and the SCRs at the POIs of central renewable power plants are strengthened. The method has potential for application on larger grids, aiding grid-integration of RES....

  8. SPEAR3 DC MAGNET POWER SUPPLIES - AN OVERVIEW

    International Nuclear Information System (INIS)

    De Lira, A.

    2004-01-01

    The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR 3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003. This paper presents an overview and descriptions of the DC magnet power supplies. These consist of tightly-regulated ((le) 10 ppm) current sources ranging in output from 30 A to 800 A and output power ranging from a few watts to almost 1.0 MW. A total of 226 magnet power supplies are in successful operation. The SPEAR 3 upgrade performance and reliability requirements mandated new power supplies for both the SPEAR 3 storage ring, and for the booster-to-SPEAR 3 (BTS) transport line. A large variety of precise, highly stable current power supplies were needed to fill the diverse magnet needs. Also described are outside procurement aspects, in-house construction, installation, testing, performance and operation of the power supplies. During field testing, special emphasis was made to ensure a critically damped response on the current loop. Frequency spectra measurements were made for reference and future diagnostics

  9. Preliminary design of high-power wave-guide/transmission system for multimegawatt CW requirements of 100 MeV proton Linac

    International Nuclear Information System (INIS)

    Shrivastava, Purushottam; Wanmode, Y.D.; Hannurkar, P.R.

    2002-01-01

    Development of a 100 MeV CW proton Linac has been planned at CAT. This Linac will be needing CW rf power in the frequency ranges of 350 MHz and 700 MHz for its RFQ and DTL/CCDTL/SFDTL structures respectively. The power to the accelerating structures will be produced by either 1 MW CW or 250 kW CW klystron/inductive output tubes (HOM IOTs). The power needed by respective feed points in the structure is max. 250 kW which will be powered by splitting the power from 1 MW klystron/klystrode into four channels by using a wave-guide system. In case of using 250 kW tubes the power to the structures will be provided directly from each tube. Two types of wave-guide transmission system have been considered, viz WR 2300 for 350 MHz rf needs and WR 1500 for 700 MHz rf needs. The typical wave-guide system has been designed using the 1 MW CW klystron followed by wave-guide filter, dual directional coupler, high-power circulator, three 3 dB magic TEE power dividers to split the main channel into four equal channels of 250 kW each. Each individual channel has dual directional couplers, flexible wave-guide sections and high power ceramic vacuum window. The circulator and each power divider is terminated into the isolated ports by high power CW loads. Out of the four channels three channels have phase shifters. Present paper describes the technological aspects and design specifications-considerations for these stringent requirements. (author)

  10. Digital compensation of receiver clipping for DVB reception on low-power mobile

    NARCIS (Netherlands)

    Linnartz, J.P.M.G.; Rietman, R.

    2007-01-01

    Battery life-time is a critical issue for digital television (DVB) viewing on mobile phones. The number of quantization steps used in the analog-to-digital converter (ADC) is an important factor in the total power consumption of a DVB receiver. The OFDM signals require a large resolution of the ADC.

  11. Workshop 'Reducing the share of drilling in the total cost of geothermal power generation'; Workshop 'Senkung des bohrtechnischen Anteils an den geothermischen Stromgestehungskosten'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    For a further development of geothermal power generation, technological adaptations of drilling technology will be required that will reduce the specific power generation cost. This workshop discussed the options for adaptation and the resulting cost improvements. Both technical and non-technical issues were tackled. The full-text documents of the workshop (overheads) can be downloaded at http://www.ie-leipzig.de. Subjects were: (1) Downhole engine technology; (2) New drilling equipment in consideration of geothermal requirements; (3) New drilling equipment in consideration of geothermal requirements; (4) Innovative drilling concepts/ Current cost allotment; (5) Higher efficiency in drilling with flushing adapted to drilling horizons; (6) MWD/LWD technologies of the KW industry; (7) Completion technology in geothermal plants; (8) Time and cost planning in drilling plans; (9) Cost-optimized drilling from a drilling contractor's view; (10) Requirements and obstacles in the licensing of new drilling equipment. (orig.)

  12. China Wind Power Outlook 2010

    International Nuclear Information System (INIS)

    Junfeng, Li; Pengfei, Shi; Hu, Gao

    2010-10-01

    China's wind power can reach 230 GW of installed capacity by 2020, which is equal to 13 times the current capacity of the Three Gorges Dam; its annual electricity output of 464.9 TWh could replace 200 coal fire power plants. In 2009, China led the world in newly installed wind-energy devices, reaching a capacity of 13.8 GW (10,129 turbines) - a rate of one new turbine every hour. In terms of overall capacity, China ranks second, at 25.8 GW. The report projects that by 2020, China's total wind power capacity will reach at least 150GW, possibly up to 230GW, which, if realized, could cut 410 million tons of CO2 emission, or 150 million tons of coal consumption. Compared to multinationals, many Chinese companies are young and lack a strong basis for research and development. Despite a renewable energy policy requiring grid companies to purchase all electricity from wind farms, access to wind power for the grid is frequently lagging behind an unstable, out-dated grid infrastructure. There is also the problem of a lack of incentives and penalties for grid companies, and slow progress in more wind energy technologies.

  13. Overview of systems requirements for impact fusion power

    International Nuclear Information System (INIS)

    Williams, J.M.; Booth, L.A.; Krakowski, R.A.

    1979-01-01

    The development of impact fusion power reactor concepts is very limited at this time. Key systems factors in arriving at practical concepts will be conception of credible systems and subsystems which promise an acceptable overall energy balance and development of target/projectile designs and gain versus projectile energy curves which allow system design tradeoffs to be accomplished. Important system parameters will be subsystem efficiencies (particularly the accelerator), target/projectile gain as a function of target design, circulating power fraction or engineering gain, system pulse repetition rate, size/cost scaling of components, containment cavity design limits, maximum yield, minimum economical yield, minimum projectile velocity and energy, and overall economics. When more detailed conceptual designs are available, then system tradeoffs and performance optimization will be possible

  14. Gas to Power in China. Gas-fired Power in China. Clearing the policy bottleneck

    International Nuclear Information System (INIS)

    Chen, Xavier

    2005-12-01

    Policy for gas-fired power is the single most serious and common issue that needs urgent resolution for all China's current and future gas projects, including LNG projects. This was the main conclusion of a national seminar on gas industry development policy that was held in July 2004. At the time of writing this paper, such a policy is still missing. In order to reduce pollution, improve energy security and meet the needs of the ever-growing economy for high-quality energies, the Chinese government has declared its firm intention to develop a natural gas market. The official target is to develop a gas market of 200 bcm/a by 2020, five times of the current size of around 40 bcm/a. Domestic supply is expected to provide 120 bcm/a, with the rest (80 bcm/a) by gas imports either in the form of piped gas or LNG. Gas-fired power generation plays a critical role in developing a sizeable gas market, especially for large-scale pipeline and LNG projects. Similar to the Guangdong and Fujian LNG projects where gas-fired power accounts for approximately 60% and 70% respectively of the first phase gas volume, each of the proposed LNG projects has allocated a large portion of the gas off-take volume to the power sector. In addition to the first two commercial CCGT plants that were commissioned in 2005, there are over 20 projects totalling 18 GW of capacity under construction. By 2020, China's planners foresee a total gas-fired power capacity of 60 GW, accounting for around 6% of the total installed capacity in the country. Despite these impressive projections, gas-fired power faces significant uncertainties in China: (1) there is an ongoing debate on whether China should develop gas-fired power, given the relative scarcity and higher cost of gas; (2) high gas prices and imported equipment limit the competitiveness of gas-fired power relative to a coal-fired one; (3) it lacks policy support. For the moment, gas-fired power plants are required to participate in a yet

  15. Total energy supply-system for manned spaceship using nuclear reactor

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Honma, Yuji; Yoshida, Yutaka; Shimazu, Yoichiro

    2007-01-01

    In order to explore the deep space, such as Mars, Jupiter, Saturn, etc in the future, a spacecraft that will be driven by nuclear power should be developed. At present, satellites or space probes have been using mainly electric source of chemical battery, fuel battery, solar battery, and RI battery. However, considering highly developed and extensive space exploration in the future, it is obvious that larger electric power is required over the long term space travel more than several years. Additionally, the solar battery used in space will be fundamentally impossible to use in planetary exploration father away form Mars because sunlight is attenuated. Therefore, larger electric power source must be installed in the space craft. In this study, we consider about co-generation system for heat and electricity using nuclear power. We think that the nuclear power is appropriate for using in deep space because of a long time operation without refueling and possibility in downsizing due to higher power density. We selected the fast reactor system of about 18 MWth compared with other type of reactors, such as PWR and high temperature gas reactor (Honma, 2006). With regard to a power generation system, we examined about efficiency of Stirling engine compared with a gas-turbine engine. Theoretical efficiency of Stirling engine is much higher than that of gas-turbine engine. Therefore, we selected Stirling engine and we have started the model test of a Stirling engine. Total power generation at International Space Station (ISS) that has been built since 1998 is about 110kWe. We estimated that about 5 times as much electricity as that of ISS is enough to explore or developed the space. In that case, 2.5MWe will be generated by the system, number of crews will be about 10 and 2MW will be used to electric propulsion. (author)

  16. Nuclear power perspective in China

    International Nuclear Information System (INIS)

    Liu Xinrong; Xu Changhua

    2003-01-01

    China started developing nuclear technology for power generation in the 1970s. A substantial step toward building nuclear power plants was taken as the beginning of 1980 s. The successful constructions and operations of Qinshan - 1 NPP, which was an indigenous PWR design with the capacity of 300 MWe, and Daya Bay NPP, which was an imported twin-unit PWR plant from France with the capacity of 900 MWe each, give impetus to further Chinese nuclear power development. Now there are 8 units with the total capacity of 6100 MWe in operation and 3 units with the total capacity of 2600 MWe under construction. For the sake of meeting the increasing demand for electricity for the sustainable economic development, changing the energy mix and mitigating the environment pollution impact caused by fossil fuel power plant, a near and middle term electrical power development program will be established soon. It is preliminarily predicted that the total power installation capacity will be 750-800GWe by the year 2020. The nuclear share will account for at least 4.0-4.5 percent of the total. This situation leaves the Chinese nuclear power industry with a good opportunity but also a great challenge. A practical nuclear power program and a consistent policy and strategy for future nuclear power development will be carefully prepared and implemented so as to maintain the nuclear power industry to be healthfully developed. (author)

  17. Committed emissions from existing and planned power plants and asset stranding required to meet the Paris Agreement

    Science.gov (United States)

    Pfeiffer, Alexander; Hepburn, Cameron; Vogt-Schilb, Adrien; Caldecott, Ben

    2018-05-01

    Over the coming decade, the power sector is expected to invest ~7.2 trillion USD in power plants and grids globally, much of it into CO2-emitting coal and gas plants. These assets typically have long lifetimes and commit large amounts of (future) CO2 emissions. Here, we analyze the historic development of emission commitments from power plants and compare the emissions committed by current and planned plants with remaining carbon budgets. Based on this comparison we derive the likely amount of stranded assets that would be required to meet the 1.5 °C–2 °C global warming goal. We find that even though the growth of emission commitments has slowed down in recent years, currently operating generators still commit us to emissions (~300 GtCO2) above the levels compatible with the average 1.5 °C–2 °C scenario (~240 GtCO2). Furthermore, the current pipeline of power plants would add almost the same amount of additional commitments (~270 GtCO2). Even if the entire pipeline was cancelled, therefore, ~20% of global capacity would need to be stranded to meet the climate goals set out in the Paris Agreement. Our results can help companies and investors re-assess their investments in fossil-fuel power plants, and policymakers strengthen their policies to avoid further carbon lock-in.

  18. Wind Power Utilization Guide.

    Science.gov (United States)

    1981-09-01

    The expres- sions for the rotor torque for a Darrieus machine can be found in Reference 4.16. The Darrieus wind turbine offers the following... turbine generators, wind -driven turbines , power conditioning, wind power, energy conservation, windmills, economic ana \\sis. 20 ABS 1"ACT (Conti,on... turbines , power conditioning requirements, siting requirements, and the economics of wind power under different conditions. Three examples are given to

  19. Power plans seek funds [in Indo-China

    International Nuclear Information System (INIS)

    Dansie, J.

    1995-01-01

    A conference in Vietnam on the Power Sector in Indochina and Myanmar in September 1995 is reported. The current power scenario in Vietnam and future government hopes and plans were outlined. In 1994 Vietnam had a total installed capacity of 4470 MW, of which 63% was hydropower. By 2010 it is hoped to increase total capacity to 18,000 MW with the hydropower contribution reduced to 50%. It is hoped to attract the US$20bn required to finance this development from investment by international organizations and private operators. However, problems exist in the form of uncertainties in Vietnamese law with respect to foreign investment and Vietnam's non-convertible currency. Vietnam is keen to attract hard currency but reluctant to let it out of the country as foreign companies would wish to do with their profits. Myanmar has been further to go than Vietnam in developing its huge hydropower resources to meet growing demand for electric power. About 40% of the country's peak demand of 550 MW is generated by hydropower but this represents only 1% of the total hydropower resource. Demand is expected to rise to 1500 MW by 2000. Again foreign investment is being sought. As in Vietnam, though, the question of an inconvertible currency arises. In addition, the subsidised low tariff in Myanmar promises only a low rate of return and the country is fighting high inflation. (U.K.)

  20. Emerging Changes in the Worldwide Power Sector: The Assets of Thermal Power

    Energy Technology Data Exchange (ETDEWEB)

    Moliere, Michel; Girardot, Amelie; Jones, Robert M.

    2007-07-01

    In forthcoming decades we will see major changes in the landscape of the worldwide power sector as CO2 management and incipient hydrocarbon scarcity exert their increasing influence. The power generation community must be prepared to satisfy a particularly complex and challenging set of requirements. These issues include curbing CO2 emissions, coping with surging primary energy prices, and compliance with regional and local emissions requirements such as SOx and NOx-while maintaining maximum efficiency. In this context, as confirmed by International Energy Agency forecasts, thermal power will maintain a prominent position in overall power generation since it enables the large capacity additions required in emerging countries. Thanks to their reliable assets (such as energy efficiency and environment) gas turbine-based power systems, including Gas Turbine Combined Cycles (GTCC) and Combined Heat & Power (CHP), will continue to be major contributors to worldwide power generation. However, evolving changes in the spectrum of fuels will create an additional challenge for power generation equipment manufacturers-requiring innovative technologies in fuel processing, combustion, and emission controls to address these needs. This paper reviews the factors underlining the changing power generation environment worldwide, including the increasing scarcity of conventional fuels and the growing interest in biofuels and hydrogen. Insights will be offered into various technologies needed to support the growing need for increased fuel flexibility.