WorldWideScience

Sample records for total installed system

  1. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  2. Total cost of ownership of CHP SOFC systems: Effect of installation context

    International Nuclear Information System (INIS)

    Arduino, Francesco; Santarelli, Massimo

    2016-01-01

    Solid oxide fuel cells (SOFC) are one of the most interesting between the emerging technologies for energy production. Although some information about the production cost of these devices are already known, their operational cost has not been studied yet with sufficient accuracy. This paper presents a life cycle cost (LCC) analysis of CHP (combined heat and power) SOFC systems performed in hospitals located in various cities of the US and one in Italy. In this study the strong effects of the installation context will be analyzed using a customized use phase model for each location. The cost effectiveness of these devices has been proved without credits in Mondovi (IT), New York (NY) and Minneapolis (MN) where the payback time goes from 10 to 7 years. Considering the credits, it is possible to obtain economic feasibility also in Chicago (IL) and reduce the payback for other cities to values from 4 to 6 years. In other cities like Phoenix (AZ) and Houston (TX) the payback can’t be reached in any case. The life cycle impact assessment analysis has shown how, even in the cities with cleaner electricity grid, there is a reduction in the emissions of both greenhouse gases and pollutants. - Highlights: •Life cycle cost analysis has been performed for CHP SOFC systems. •The strong effects of the installation context have been analyzed. •Economic feasibility has been proven in new york, Minneapolis and Mondovi. •Economic feasibility can’t be reached in phoenix and Houston. •SOFC always provide a reduction in the emissions of greenhouse gases and pollutant.

  3. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  4. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  5. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  6. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  7. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  8. Installation package - SIMS prototype system 1A

    Science.gov (United States)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  9. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  10. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  11. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  12. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  13. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  14. ACP Facility Safety Surveillance System Installation

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-10-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hotcell was built in the IMEF basement. All facilities which treat radioactive materials must manage CCTV system which is under control of Health Physics department. Three main points (including hotcell rear door area) have each camera, but operators who are in charge of facility management need to check the safety of the facility immediately through the network in his office. This needs introduce additional network cameras installation and this new surveillance system is expected to update the whole safety control ability with existing system

  15. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  16. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  17. Installation of a second trip system

    International Nuclear Information System (INIS)

    Bessada, E.

    1997-01-01

    Since its first criticality in 1957, the NRU reactor has been operating safely and efficiently supporting the CANDU reactor's research and development programs and producing radioisotopes for medical use. To ensure that the reactor continues to operate safely and effectively, Atomic Energy of Canada Limited (AECL) commissioned a team in 1989 to conduct a systematic review and assessment of the reactor condition. The outcome of the study indicated that the overall condition of the reactor is good and that it is being operated safely. The study also produced recommendations as to where safety can be improved. These recommendations are the basis of the upgrade program currently being implemented in the reactor. The Second Trip System (STS) is part of the upgrade program. It is a stand alone seismically qualified trip system that operates independently from the existing first trip system (FST) to shutdown the reactor. This paper discusses the design, installation and the inactive commissioning of the system, and the process used to ensure that the system can be retrofitted to the reactor without affecting its safety or its operational requirements. (author)

  18. Total System Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-15

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the comprehensive

  19. Total System Performance Assessment

    International Nuclear Information System (INIS)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-01

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the comprehensive

  20. Total System Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-15

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the

  1. Solar heating and hot water system installed at Listerhill, Alabama

    Science.gov (United States)

    1978-01-01

    The Solar system was installed into a new building and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

  2. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  3. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  4. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  5. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  6. Solar hot water system installed at Las Vegas, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

  7. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  8. Renewable energy systems in Mexico: Installation of a hybrid system

    Science.gov (United States)

    Pate, Ronald C.

    1993-05-01

    Sandia has been providing technical leadership on behalf of DOE and CORECT on a working level cooperative program with Mexico on renewable energy (PROCER). As part of this effort, the Sandia Design Assistance Center (DAC) and the solar energy program staff at Instituto de Investigaciones Electricas (IIE) in Cuernavaca, Mexico, recently reached agreement on a framework for mutually beneficial technical collaboration on the monitoring and field evaluation of renewable energy systems in Mexico, particularly village-scale hybrid systems. This trip was made for the purpose of planning the details for the joint installation of a data acquisition system (DAS) on a recently completed PV/Wind/Diesel hybrid system in the village of Xcalac on the Southeast coast of the state of Quintana Roo, Mexico. The DAS installation will be made during the week of March 15, 1993. While in Mexico, discussions were also held with personnel from.the National Autonomous University of Mexico (UNAM) Solar Energy Laboratory and several private sector companies with regard to renewable energy project activities and technical and educational support needs in Mexico.

  9. The installation of helium auxiliary systems in HTGR

    International Nuclear Information System (INIS)

    Qin Zhenya; Fu Xiaodong

    1993-01-01

    The inert gas Helium was chosen as reactor coolant in high temperature gas coolant reactor, therefore a set of Special and uncomplex helium auxiliary systems will be installed, the safe operation of HTR-10 can be safeguarded. It does not effect the inherent safety of HTR-10 MW if any one of all those systems were damaged during operation condition. This article introduces the design function and the system principle of all helium auxiliary systems to be installed in HTR-10. Those systems include: helium purification and its regeneration system, helium supply and storage system, pressure control and release system of primary system, dump system for helium auxiliary system and fuel handling, gaseous waste storage system, water extraction system for helium auxiliary systems and evacuation system for primary system

  10. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1986-01-01

    The systems of each country member of the OECD is described according to a plan standardised to the extent possible, so as to facilitate comparison between the National systems. In most cases, the descriptions are supplemented by flow charts illustrating the steps in the licensing procedure and the intervention of the various bodies concerned

  11. Installation of JMTR core management system

    International Nuclear Information System (INIS)

    Imaizumi, Tomomi; Ide, Hiroshi; Naka, Michihiro; Komukai, Bunsaku; Nagao, Yoshiharu

    2013-01-01

    In order to carry out the core management after the reoperation of JMTR quickly and accurately, the authors took up the Standard Reactor Analysis Code (SRAC) system and core management support programs that are operating in a general-purpose large computer and transferred them to PC (OS: Linux), and newly established a JMTR core management system. As for the core analysis, this measure enabled an increase in the processing speed from the check of core arrangement to the result display of nuclear restriction values to about 60 times, compared with the conventional method. It was confirmed that the differences of calculation results originated from the difference of internal display of computers, associated with the transfer of each analysis code from GS21-400 system to PC-Linux, were within practically allowable level. In the future, this system will be applied to the core analysis of JMTR, as well as to the preparation of operation plans. (A.O.)

  12. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  13. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  14. Integrated system for nuclear installation control

    International Nuclear Information System (INIS)

    Mirchev, M.; Boyiklieva, R.; Peneva, A.

    2008-01-01

    A comparison between the international requirements and standards to an integrated management system is presented. The IAEA GS-R-3, BS PASS 99, ISO 9001, ISO 14001, BS OHSAS 18001 and ISO/IEC 27001 are reviewed and compared by the following aspects: definition and integration of processes; safety culture, risk analyses, satisfaction of the concerned parties, actions in case of discrepancy

  15. An improved sampling system installed for reprocessing

    International Nuclear Information System (INIS)

    Finsterwalder, L.; Zeh, H.

    1979-03-01

    Sampling devices are needed for taking representative samples from individual process containers during the reprocessing of irradiated fuel. The aqueous process stream in a reprocessing plant frequently contains, in addition to the dissolved radioactive materials, more or less small quantities of solid matter fraction of fuel material still remaining undissolved, insoluble fission-, corrosion-, or degradation products as well, in exceptional cases, ion exchange resin or silica gel. The solid matter is deposited partly on the upper surfaces of the sampling system and the radiation due to this makes maintenance and repair of the sampler more difficult. The purpose of the development work was to reduce the chance of accident and the maintenance costs and to lower the radiation exposure of the personnel. A new sampling system was developed and is described. (author)

  16. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  17. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  18. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  19. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  20. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Al-Haddad, Tristan [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Valdes, Francisco [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Caravati, Kevin [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Goodman, Joseph [Georgia Tech Applied Research Corporation, Atlanta, GA (United States)

    2015-08-27

    Georgia solar industry employs 2,890 solar workers, representing a 12.8% growth in employment over 2013 (Solar Jobs Census, 2014). • Growth of the solar industry: The DOE SIMPLE BoS SunShot Award to GTARC accelerated the growth of the solar industry in Georgia, due to the national publicity of the award and the engagement of numerous solar PV manufacturers, designers, and installers on the SIMPLE BoS project. In 2011 less than 50 megawatts of solar PV capacity existed in Georgia; by 2016 Georgia may reach nearly 800 MW of total approved solar capacity with the 2012 Georgia Power Advanced Solar Initiative. • Technical outreach and publications: Georgia Tech has participated in numerous technical symposiums, technology demonstrations, campus solar PV tours, and produced 18 publications for the solar industry and general public. • Cost reductions for consumers: The SIMPLE BoS pre-commercial systems and discoveries enable cost reductions of 50% or more in labor and materials for residential, commercial and utility scale PV installations.

  1. Regional Information System for Educators: Installation and Evaluation.

    Science.gov (United States)

    Kromer, Charles

    This document describes the installation and evaluation of the Regional Information System within the Michigan-Ohio Regional Educational Laboratory (MOREL). MOREL is an agency established to develop and test alternatives to current educational practice under Title IV of ESEA. The Regional Information System was established to provide referrals to…

  2. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  3. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  4. [Requirements for the successful installation of an data management system].

    Science.gov (United States)

    Benson, M; Junger, A; Quinzio, L; Hempelmann, G

    2002-08-01

    Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.

  5. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  6. Installation and commissioning of instantaneous dose rate monitoring system

    CERN Document Server

    Iaydjiev, Plamen

    2018-01-01

    INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users.

  7. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  8. Solar space and water heating system installed at Charlottesville, Virginia

    Science.gov (United States)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  9. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  10. Input-output analysis for installing renewable energy systems

    International Nuclear Information System (INIS)

    Itoh, Y.; Nakata, T.

    2004-01-01

    Renewable energy facilities have been installed in many regions, because of their possibility to be an alternative to fossil fuels for mitigating global warming. Besides the profitability of renewable energy businesses, indirect economic effects of installing renewable energy facilities should be clarified. This study examines the possibility that the renewable energy facilities give renewed impetus to regional economic progress. The economic effects are analysed with input-output techniques in a rural area in Japan. As a consequence, both positive and negative effects on the rural economy are derived. In addition, we will focus on the changes in sectors such as construction, business services, banking, etc. as a result of economic activities for renewable systems. The business benefits of renewable energy system are discussed. (author)

  11. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  12. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  13. IMIS: Integrated Marine Installation System for offshore turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The report describes a feasibility study on the Integrated Marine Installation System for offshore wind turbines. The aspects covered are (1) Background and why the study is required; (2) Aims and objectives of the project; (3) Summary of methods adopted; (4) Design criteria according to the area for deployment; (5) Conclusions and recommendations. The ultimate goal will be to install and secure the wind turbine in position using an integrated approach to avoid using lifting vessels. To date, an initial feasibility study has been carried out where four different concepts were considered. The next phase of the project will be to address a number of possible risks and constraints before the chosen concept can be demonstrated to be viable. The work is being carried out by Setech Ltd, Armstrong Technology Associates Ltd and Smith Rea Energy Ltd for the DTI.

  14. Radiation safety system (RSS) backbones: Design, engineering, fabrication and installation

    International Nuclear Information System (INIS)

    Wilmarth, J.E.; Sturrock, J.C.; Gallegos, F.R.

    1998-01-01

    The Radiation Safety System (RSS) Backbones are part of an electrical/electronic/mechanical system insuring safe access and exclusion of personnel to areas at the Los Alamos Neutron Science Center (LANSCE) accelerator. The RSS Backbones control the safety fusible beam plugs which terminate transmission of accelerated ion beams in response to predefined conditions. Any beam or access fault of the backbone inputs will cause insertion of the beam plugs in the low energy beam transport. The Backbones serve the function of tying the beam plugs to the access control systems, beam spill monitoring systems and current-level limiting systems. In some ways the Backbones may be thought of as a spinal column with beam plugs at the head and nerve centers along the spinal column. The two Linac Backbone segments and experimental area segments form a continuous cable plant over 3,500 feet from beam plugs to the tip on the longest tail. The Backbones were installed in compliance with current safety standards, such as installation of the two segments in separate conduits or tray. Monitoring for ground-faults and input wiring verification was an added enhancement to the system. The system has the capability to be tested remotely

  15. Assessing the effects of customer innovativeness, environmental value and ecological lifestyles on residential solar power systems install intention

    International Nuclear Information System (INIS)

    Chen, Kee Kuo

    2014-01-01

    To understand the impact of environmental value, ecological lifestyle, customer innovativeness on customer intention to install solar power system (SPS) in their private houses, an empirical model was proposed. Customer innovativeness was treated as a second-order construct with two first-order dimensions, with each of the latter being measured by means of reflective indicators. Using structural equation modeling, data collected from 203 college students and faculties at a University of Taiwan were tested against the model. We found that environmental value has a positive impact on ecological lifestyle and SPS install intention. Although ecological lifestyle associates positively with SPS install intention, the effect disappears when environmental value is included in the model. The effect of customer innovativeness on SPS install intention results from the tendency of customer novelty seeking, while the impact of customer independent judgment-making on SPS install intention is insignificant. The model explained 76% of the total variations within SPS install intention. Managerial implications for promoting of SPS are considered, and suggestions for further research provided. - Highlights: • We integrate customer innovativeness into an environmental behavior model. • The impact of customer innovativeness on SPS install intention was confirmed. • The impact of novelty seeking on SPS install intention has been found. • Environmental value is the most important factor for SPS install intention. • The model explained 76% of the total variations within SPS install intention

  16. Solar warming systems of water installed in Colombia. Photovoltaic solar systems installed in the Country

    International Nuclear Information System (INIS)

    Rodriguez P, F.

    1995-01-01

    Between the systems that operate as of solar energy, the solar collectors to heat water have had wide use and application in the Country. Basically, a solar collector is constituted by: Box, thermal insulator, ducts and transparent roof. Generally, the used materials are the following: As thermal insulator: Polyurethane or glass fiber; as absorbent plate: Copper or aluminum, painting in dull black or selective surfaces; for the ducts: Generally it is used copper pipeline; and for the cover: Common glass or temperate glass

  17. Total body irradiation for installment of arylsulfatase B activity in a cat by bone marrow transplantation

    International Nuclear Information System (INIS)

    Macy, D.W.; Gillette, E.L.; Gasper, P.W.; Thrall, M.A.; Wenger, D.A.; Kessell, M.L.; Hoover, E.A.

    1984-01-01

    Mucopolysaccharidosis VI is an inherited, metabolic defect in which a deficiency of arylsulfatase B, results in accumulation of glycosaminoglycans (GAG) in lysosomes. Arylsulfatase B activity was installed in an affected 2 year old siamese cat with no arylsulfatase B activity, excess urinary GAG, Alder-Reilly bodies in neutrophils, facial dysmorphia, corneal clouding, multiple epiphyseal dysplasia, and hind limb paresis. Following grafting of bone marrow from an immunologically nonreactive, female sibling with normal arylsulfatase B activity, increased arylsulfatase B activity and urinary excretion of hexuronic acid decreased by 19 days post transplantation. There were no metachromatic inclusions in circulating neutrophils, which were phenotypically female. The cat now has competent trilineage hematopoiesis, resolution of the facial dysmorphia, no corneal clouding, and improved movement of the head, neck, and mandible. The technique, sequence of hematologic recovery, and evidence of engraftment, are discussed. This may be a model for correction of mucopolysaccharidosis VI in man

  18. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  19. The Application of Systemic Safety for Smaller Nuclear Installations

    International Nuclear Information System (INIS)

    Ward, J.

    2016-01-01

    This paper will provide an outline of ARPANSA’s approach to systemic safety as applied to smaller hazard nuclear installations. It will describe ARPANSA’s effort to enable licence holders to better understand the principles of systemic safety so that they may make improvements for themselves. In regard to human and organizational factors, inspections are more often used to highlight areas where performance can be improved to meet best practice rather than strictly as a compliance tool. This takes account of a graded, risk informed approach and is undertaken in a collaborative way that places a premium on openness, clarity, reliability and efficiency. The paper will discuss the challenges faced by the approach, and how ARPANSA is currently managing these. It will describe ARPANSA’s regulatory guidance and inspection processes. The significant stages in ARPANSA development of the systemic approach are provided briefly in the following paragraphs.

  20. Installation and early operation of a complex low inventory cryogenic distillation system for the Princeton TFTR

    International Nuclear Information System (INIS)

    Busigin, A.; Busigin, C.J.; Robins, J.R.; Woodall, K.B.; Bellamy, D.G.; Fong, C.; Kalyanam, K.; Sood, S.K.

    1995-01-01

    A low inventory Tritium Purification System (TPS) has just been installed at the Princeton Plasma Physics Laboratory (PPPL). The TPS was designed specifically for PPPL, based on their specifications for exhaust gases. The generic design, however, can easily be modified to accept a large variety of input conditions. The Princeton system is designed to have a total tritium inventory of approximately 0.5 g while producing pure product streams consisting of H 2 , D 2 , and T 2 . The purpose of the system is to separate and recycle unburnt tritium from the TFTR and to produce hydrogen and deuterium streams that are free of tritium. These streams can be disposed by stacking, thus eliminating the need to create large volume waste streams that are contaminated with tritium and that must be managed for permanent disposal. This paper will discuss the installation, the modifications and preliminary results of operation of this system at Princeton. 2 refs., 3 figs

  1. Method and system for installing a layered vessel on location

    International Nuclear Information System (INIS)

    Pechacek, R.E.; Clay, E.J.

    1982-01-01

    A method and system for installing a layered vessel wherein the method includes the steps of constructing the bottom vessel head section in an inverted position mounting the bottom head section on the vessel foundation, erecting a generally cylindrical construction frame having a plurality of annular work stations; substantially simultaneously with the erection of the cylindrical construction frame, constructing onto the bottom head a cylindrical inside shell liner and a hemispherical upper head inside liner and adding layers to the inside shell from the bottom upwardly with the addition of such layers occurring substantially simultaneously at various of the annular work stations. A system for accomplishing these steps is provided, including particular method for constructing the bottom head, and further, an annularly movable crane assembly is provided for the work stations. (author)

  2. Installation Guidelines for Solar DHW Systems in One- and Two-Family Dwellings. Second Edition.

    Science.gov (United States)

    Hollander, Peter; And Others

    Described are some of the better techniques for installing solar domestic hot water (DHW) systems. By using these guidelines, along with the manufacturer's manual, professional installation contractors and skilled homeowners should be able to install and fill a solar DHW system. Among the topics considered are system layouts, siting, mounting…

  3. Design and installation of a multimode microscopy system

    Science.gov (United States)

    Helm, Johannes P.; Haug, Finn-Mogens S.; Storm, Johan F.; Ottersen, Ole-Petter

    2001-04-01

    We describe design and installation of a multi-mode microscopy core facility in an environment of varied research activity in life-sciences. The experimentators can select any combination of a) microscopes (upright, upright fixed-stage, inverted), b) microscopy modes (widefield, DIC, IRDIC, widefield epifluorescence, transmission LSM, reflection and fluorescence CLSM, MPLSM), c) imaging techniques (direct observation, video observation, photography, quantitative camera-recording, flying spot scanning), d) auxiliary systems (equipment for live specimen imaging, electrophysiology, time-coordinated laser-scanning and electrophysiology, patch-clamp). The equipment is installed on one large vibration-isolating optical table (3m X 1.5m X 0.3m). Electronics, auxiliary equipment, and a fiber-coupled, remotely controlled Ar+-Kr+ laser are mounted in a rack system fixed to the ceiling. The design of the shelves allows the head of the CSLM to be moved to any of the microscopes without increasing critical cable lengths. At the same time easy access to all the units is preserved. The beam of a Titanium-Sapphire laser, controlled by means of an EOM and a prism GVD, is coupled directly to the microscopes. Three mirrors mounted on a single precision translation table are integrated into the beam steering system so that the beam can easily be redirected to any of the microscopes. All the available instruments can be operated by the educated and trained user. The system is popular among researchers in neuroanatomy, embryology, cell biology, molecular biology - including the study of protein interactions, e.g. by means of FRET, and electrophysiology. Its colocalization with an EM facility promises to provide considerable synergy effects.

  4. Installation dismantling system, working process and hood utilizable in this system

    International Nuclear Information System (INIS)

    Poirier, J.C.; Mulcey, P.; Morel, P.; Vavasseur, C.

    1989-01-01

    The system for dismantling an installation under a controlled atmosphere is made by a tool polluting the atmosphere, a gas blanket creating a continement zone around the tool, an extractor removing polluted gas from the zone, a purifier for the extracted gas and a controller regulating the flow of gas in the blanket and keeping the installation at constant pressure [fr

  5. Phase change thermal storage for a solar total energy system

    Science.gov (United States)

    Rice, R. E.; Cohen, B. M.

    1978-01-01

    An analytical and experimental program is being conducted on a one-tenth scale model of a high-temperature (584 K) phase-change thermal energy storage system for installation in a solar total energy test facility at Albuquerque, New Mexico, U.S.A. The thermal storage medium is anhydrous sodium hydroxide with 8% sodium nitrate. The program will produce data on the dynamic response of the system to repeated cycles of charging and discharging simulating those of the test facility. Data will be correlated with a mathematical model which will then be used in the design of the full-scale system.

  6. Reliability of sprinkler systems. Exploration and analysis of data from nuclear and non-nuclear installations

    International Nuclear Information System (INIS)

    Roenty, V.; Keski-Rahkonen, O.; Hassinen, J.P.

    2004-12-01

    Sprinkler systems are an important part of fire safety of nuclear installations. As a part of effort to make fire-PSA of our utilities more quantitative a literature survey from open sources worldwide of available reliability data on sprinkler systems was carried out. Since the result of the survey was rather poor quantitatively, it was decided to mine available original Finnish nuclear and non-nuclear data, since nuclear power plants present a rather small device population. Sprinklers are becoming a key element for the fire safety in modern, open non-nuclear buildings. Therefore, the study included both nuclear power plants and non-nuclear buildings protected by sprinkler installations. Data needed for estimating of reliability of sprinkler systems were collected from available sources in Finnish nuclear and non-nuclear installations. Population sizes on sprinkler system installations and components therein as well as covered floor areas were counted individually from Finnish nuclear power plants. From non-nuclear installations corresponding data were estimated by counting relevant things from drawings of 102 buildings, and plotting from that sample needed probability distributions. The total populations of sprinkler systems and components were compiled based on available direct data and these distributions. From nuclear power plants electronic maintenance reports were obtained, observed failures and other reliability relevant data were selected, classified according to failure severity, and stored on spreadsheets for further analysis. A short summary of failures was made, which was hampered by a small sample size. From non-nuclear buildings inspection statistics from years 1985.1997 were surveyed, and observed failures were classified and stored on spreadsheets. Finally, a reliability model is proposed based on earlier formal work, and failure frequencies obtained by preliminary data analysis of this work. For a model utilising available information in the non

  7. Leader completes installation of process water evaporation system

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-11-01

    The installation of a patent-pending evaporation system at a facility in northeast British Columbia was discussed. The system captures excess waste exhaust heat from natural gas-fired compressor engines and is used to evaporate process water. The disposal of process water is a major cost in the production of natural gas and is usually hauled and disposed at water disposal wells located off-site. The cost to truck and dispose of the water at the facility was estimated at between $30 to $40 per cubic metre. The evaporation system can evaporate 4 to 8 cubic metres of process water every 24 hours and has an estimated useful life of 20 years. The evaporator relies on heat that would otherwise be expelled directly into the atmosphere, and the systems are expected to provide substantial savings. A wide-ranging manufacturing and marketing strategy was expected to commence by the end of 2005. With rising energy prices, operators of facilities are seeking more efficient ways of managing energy needs. The system was created by Leader Energy Services Ltd., a company that provides essential field services for oil and gas well stimulation in Alberta.

  8. Cabin fuselage structural design with engine installation and control system

    Science.gov (United States)

    Balakrishnan, Tanapaal; Bishop, Mike; Gumus, Ilker; Gussy, Joel; Triggs, Mike

    1994-01-01

    Design requirements for the cabin, cabin system, flight controls, engine installation, and wing-fuselage interface that provide adequate interior volume for occupant seating, cabin ingress and egress, and safety are presented. The fuselage structure must be sufficient to meet the loadings specified in the appropriate sections of Federal Aviation Regulation Part 23. The critical structure must provide a safe life of 10(exp 6) load cycles and 10,000 operational mission cycles. The cabin seating and controls must provide adjustment to account for various pilot physiques and to aid in maintenance and operation of the aircraft. Seats and doors shall not bind or lockup under normal operation. Cabin systems such as heating and ventilation, electrical, lighting, intercom, and avionics must be included in the design. The control system will consist of ailerons, elevator, and rudders. The system must provide required deflections with a combination of push rods, bell cranks, pulleys, and linkages. The system will be free from slack and provide smooth operation without binding. Environmental considerations include variations in temperature and atmospheric pressure, protection against sand, dust, rain, humidity, ice, snow, salt/fog atmosphere, wind and gusts, and shock and vibration. The following design goals were set to meet the requirements of the statement of work: safety, performance, manufacturing and cost. To prevent the engine from penetrating the passenger area in the event of a crash was the primary safety concern. Weight and the fuselage aerodynamics were the primary performance concerns. Commonality and ease of manufacturing were major considerations to reduce cost.

  9. Total energy system in the future

    International Nuclear Information System (INIS)

    Hijikata, K.

    1994-01-01

    The possibility of improving the thermal efficiency of energy systems from an exergy point of view is discussed. In total energy systems, we should employ multi-pass recycling consisting of thermal and chemical energies. The recycling system is supported by electrical energy, which is provided by a renewable energy source or by excess commercial electric power. This total energy system should be considered not only in one country, but all around the globe. (author). 6 figs., 4 tabs., 8 refs

  10. Installation package for a domestic solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    The installation of two prototype solar heating and hot water systems is described. The systems consists of the following subsystems: solar collector, storage, control, transport, and auxiliary energy.

  11. Tracking the Sun 10: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2017-09-21

    Berkeley Lab’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected, residential and non-residential systems solar photovoltaic (PV) systems in the United States. The present report, the tenth edition in the series, focuses on systems installed through year-end 2016, with preliminary data for the first half of 2017. The report provides an overview of both long-term and more-recent trends, highlighting key drivers for installed price declines over different time horizons. The report also extensively characterizes the widespread variability in system pricing, comparing installed prices across states, market segments, installers, and various system and technology characteristics. The trends described in this report derive from project-level data collected by state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data for this report were compiled and cleaned for more than 1.1 million individual PV systems, though the analysis in the report is based on a subset of that sample, consisting of roughly 630,000 systems with available installed price data. The full underlying dataset of project-level data (excluding any confidential information) is available in a public data file, for use by other researchers and analysts.

  12. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  13. Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Darghouth, Naïm [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cates, Sarah [Exeter Associates, Columbia, MD (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2016-08-16

    Now in its ninth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and non-residential systems installed through year-end 2015, with preliminary trends for the first half of 2016. An accompanying LBNL report, Utility-Scale Solar, addresses trends in the utility-scale sector. This year’s report incorporates a number of important changes and enhancements from prior editions. Among those changes, LBNL has made available a public data file containing all non-confidential project-level data underlying the analysis in this report. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. Refer to the text box to the right for several key notes about these data. In total, data were collected and cleaned for more than 820,000 individual PV systems, representing 85% of U.S. residential and non-residential PV systems installed cumulatively through 2015 and 82% of systems installed in 2015. The analysis in this report is based on a subset of this sample, consisting of roughly 450,000 systems with available installed price data.

  14. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    International Nuclear Information System (INIS)

    Musyurka, A. V.

    2016-01-01

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  15. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    Energy Technology Data Exchange (ETDEWEB)

    Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru [Bureya HPP (a JSC RusGidro affiliate) (Russian Federation)

    2016-09-15

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  16. An analysis of file system and installation of the file management system for NOS operating system

    International Nuclear Information System (INIS)

    Lee, Young Jai; Park, Sun Hee; Hwang, In Ah; Kim, Hee Kyung

    1992-06-01

    In this technical report, we analyze NOS file structure for Cyber 170-875 and Cyber 960-31 computer system. We also describe functions, procedure and how-to-operate and how-to-use of VDS. VDS is used to manage large files effectively for Cyber computer system. The purpose of the VDS installation is to increase the virtual disk storage by utilizing magnetic tape, to assist the users of the computer system in managing their files, and to enhance the performance of KAERI Cyber computer system. (Author)

  17. Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.

    Energy Technology Data Exchange (ETDEWEB)

    Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

    1999-02-24

    The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

  18. Radiation protection systems on the TESLA Accelerator Installation

    International Nuclear Information System (INIS)

    Pavlovic, R.

    1996-01-01

    In the Institute of Nuclear sciences VINCA, the Accelerator Installation TESLA which is an medium energy ion accelerator facility consisting of an isochronous cyclotron VINCY, a heavy ion source, a D/H ion source, three low energy and five high energy experimental channels is now under construction. Some problems in defining radiation protection and safety programme, particularly problems in construction appropriate shielding barriers at the Accelerator Installation TESLA are discussed in this paper. (author

  19. Total Analysis System for Ship Structural Strength

    OpenAIRE

    Takuya, Yoneya; Hiroyuki, Kobayashi; Abdul M., Rahim; Yoshimichi, Sasaki; Masaki, Irisawa; Technical Investigation and Information Department, Research Center; Technical Investigation and Information Department, Research Center; Singapore Office; Technical Investigation and Information Department, Research Center; Technical Investigation and Information Department, Research Center

    2001-01-01

    This paper outlines a total analysis system for ship hull structures, which integrates a wide variety of analysis functions to realise practical applications of rational methods for assessing ship structural strength. It is based on direct calculation of wave-induced loads as well as three-dimensional structural analysis of an entire-ship or hold structure. Three major analysis functions of the total system are ship motion and wave load analysis, ship structural analysis and statistical analy...

  20. Assembly, installation and commissioning of the new halo current sensors system for JET

    International Nuclear Information System (INIS)

    Peruzzo, S.; Fullard, K.; Grando, L.; Huntley, S.; Lam, N.; Pomaro, N.; Riccardo, V.; Sonato, P.

    2007-01-01

    This paper presents the status of the halo current sensors (HCS) diagnostic enhancement project for JET. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, with a total of 24 Rogowski coils and 5 toroidal field pick-up coils. These sensors are meant to provide a measurement of the current flowing through each single tile of the upper dump plate and an estimate of the total poloidal halo current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/2005 shutdown and the acquisition of signals started during the restart phase of the machine in autumn 2005. This paper firstly summarises the critical aspects encountered during the final phase of the procurement of the system and the in-vessel installation, which was accomplished using the remote handling system. The paper then focuses on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns

  1. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  2. Manual instructivo de instalación y control de prótesis totales Instructive manual of installation and control of total prostheses

    Directory of Open Access Journals (Sweden)

    Marcia Hortensia Corona Carpio

    2007-12-01

    Full Text Available Se realizó un estudio de la literatura con el objetivo de describir el paso clínico de instalación y control de prótesis total, durante el período comprendido de enero a mayo del 2005 en la Clínica Estomatológica Provincial Docente de Santiago de Cuba. Se abordaron diversos aspectos, definición de conceptos, así como todo el proceder clínico, instrucciones al paciente y consejo s a los portadores de prótesis. Se enfatizó en el paciente geriátrico, destacándose que precisamente este paso es el indicado para eliminar los defectos evidentes y donde el paciente adquiere el hábito de utilizarlos y el organismo de aceptarlo.A literature study was conducted aimed at describing the clinical step of installation and control of total prosthesis at the Provincial Teaching Dental Clinic of Santiago de Cuba from January to May, 2005. Diverse aspects were dealt with, as well as the definition of concepts, the whole clinical procedure, instructions to the patients and advises to prosthesis wearers. Emphasis was made on the geriatric patient, and it was stressed that this step is the indicated to eliminate the evident defects, and where the patient acquires the habit to use them and the body to accept them.

  3. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  4. A Total Information Management System For All Medical Images

    Science.gov (United States)

    Ouimette, Donald; Nudelman, Sol; Ramsby, Gale; Spackman, Thomas

    1985-09-01

    A PACS has been designed for the University of Connecticut Health Center to serve all departments acquiring images for diagnosis, surgery and therapy. It incorporates a multiple community communications architecture to provide complete information management for medical images, medical data and departmental administrative matter. The system is modular and expandable. It permits an initial installation for radiology and subsequent expansion to include other departments at the Health Center, beginning with internal medicine, surgery, ophthalmology and dentistry. The design permits sufficient expansion to offer the potential for accepting the additional burden of a hospital information system. Primary parameters that led to this system design were based on the anticipation that departments in time could achieve generating 60 to 90% of their images suited to insertion in a PACS, that a high network throughput for large block image transfers would be essen-tial and that total system reliability was fundamental to success.

  5. Safeguards Strategy in Physical Protection System for Nuclear Installation

    International Nuclear Information System (INIS)

    Ade lndra B; Kasturi; Tatang Eryadi

    2004-01-01

    Safeguards strategy is directed at efforts of eliminating theft of nuclear materials and sabotage of nuclear installation. For achieving the above objective, it is necessary to set up safeguards strategy in physical protection of nuclear materials and installation. The safeguards strategy starts from anticipated security condition, list of thefts, planning referred to as safeguards planning. Safeguards planning are implemented in safeguards implementation, followed up then by evaluation. Results of evaluation are equipped with results of safeguards survey already developed. Safeguards' planning is made from these results and serve as guidelines for next safeguards implementation and is repeated to form a safeguard cycle. One safeguard cycle is made on a periodical basis, at least annually. (author)

  6. 14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)

    Science.gov (United States)

    2010-01-01

    ... Appendix I to Part 25—Installation of an Automatic Takeoff Thrust Control System (ATTCS) I25.1General. (a... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation of an Automatic Takeoff Thrust...

  7. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Science.gov (United States)

    2010-07-01

    ... Operations § 250.1628 Design, installation, and operation of production systems. (a) General. All production... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Design, installation, and operation of production systems. 250.1628 Section 250.1628 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF...

  8. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ... Submerged Liquid Storage Systems,” and the American Petroleum Institute (API) Publication 1632, “Cathodic... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615 (November 1979), “Installation of...

  9. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    Science.gov (United States)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  10. Policy and systems analysis for nuclear installation decommissioning

    International Nuclear Information System (INIS)

    Gu Jiande

    1995-01-01

    On the basis of introducing into principal concept for nuclear installation decommissioning, form policy, sciences point of view, the author analyses present problems in the policy, the administrative and programme for decommissioning work in China. According to the physical process of decommissioning, the author studied engineering economics, derived method and formulas to estimate decommissioning cost. It is pointed out that basing on optimization principle for radiation protection and analysing cost-benefit for decommissioning engineering, the corresponding policy decision can be made

  11. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  12. Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naïm R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spears, Mike [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Buckley, Michael [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Grue, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-08-01

    Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and nonresidential systems installed through year-end 2014, with preliminary trends for the first half of 2015. As noted in the text box below, this year’s report incorporates a number of important changes and enhancements. Among those changes, this year's report focuses solely on residential and nonresidential PV systems; data on utility-scale PV are reported in LBNL’s companion Utility-Scale Solar report series. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data were collected for roughly 400,000 individual PV systems, representing 81% of all U.S. residential and non-residential PV capacity installed through 2014 and 62% of capacity installed in 2014, though a smaller subset of this data were used in analysis.

  13. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  14. Solar heating and cooling system installed at Leavenworth, Kansas

    Science.gov (United States)

    1980-01-01

    A solar heating and cooling is described which is designed to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2,200 square feet. Five 3 ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3,000 gallon chilled water storage tank. Two 3,000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

  15. System design and installation for RS600 programmable control system for solar heating and cooling

    Science.gov (United States)

    1978-01-01

    Procedures for installing, operating, and maintaining a programmable control system which utilizes a F8 microprocessor to perform all timing, control, and calculation functions in order to customize system performance to meet individual requirements for solar heating, combined heating and cooling, and/or hot water systems are described. The manual discusses user configuration and options, displays, theory of operation, trouble-shooting procedures, and warranty and assistance. Wiring lists, parts lists, drawings, and diagrams are included.

  16. Installation of a bio-venting remediation system using directionally drilled horizontal wells

    International Nuclear Information System (INIS)

    Hardy, L.; Stolz, A.P.

    1997-01-01

    The installation of a remediation system for off-site contamination was discussed. The site was contaminated with gasoline and diesel from an abandoned bulk fuel storage and distribution terminal located near a highway. The dissolved phase hydrocarbon plume extended beneath several houses down gradient of the site. Bioventing was considered to be the only remediation option to recover the liquid phase hydrocarbons beneath the highway in a way that would satisfy all the clean-up objectives and the design constraints. Bioventing is closely related to soil vapour extraction (SVE). The main difference is that in bioventing, the mechanism for removal of contaminants is bio-degradation by indigenous bacteria, whereas in SVE, contaminants are simply removed by volatilization. Bioventing systems enhance the activity of the indigenous bacteria by inducing air flow in the subsurface through the use of vapour injection or extraction wells. Two horizontal vapour extraction wells were installed with a directional drill. A soil pile was utilized as a bio-filter for the extracted hydrocarbon vapours and a backfilled trench was used to inject vapours recovered from the soil pile to the subsurface. The total mass of hydrocarbons degraded by this system in 230 days was estimated to be 1,000 kg. It was concluded that under appropriate conditions the in-situ treatment of contaminated soil using directionally drilled wells can be justified on both economic and technical grounds. 3 refs., 1 tab., 5 figs

  17. Installation design of pump motor control systems for supplied of the RSG-GAS secondary raw water cooling system

    International Nuclear Information System (INIS)

    Kiswanto; Teguh Sulistyo; M-Taufik

    2013-01-01

    It has designed already of an installation of the pump motor control system for supplied of raw water to fulfil the RSG-GAS secondary cooling system. The installation design of this plant is used to supply electrical energy from PLN and 3 phase generator to operate the pump motor embedded multilevel type, capacity, Q = 30 m 3 /h; electric power, PN = 4 kW; voltage, 380V/3-/50Hz, and Y connections that can be operated manually or automatically by using the automatic transfer switch. The results obtained recapitulation total load of 4 kW, the magnitude of the nominal current of 9.5 A; kind of safety and capacity are used NFB 16 A, use of this type of cable to the control panel is PLN NYY 6 mm 2 diameter maximum current capacity of 25 A cable and use the control panel to the pump motor cable type NYY 4 mm 2 diameter maximum current capacity of 20 A. The design of the pump motor control system installation is ready to be implemented. (author)

  18. Comparative risk assessment of total energy systems

    International Nuclear Information System (INIS)

    Soerensen, B.

    1982-01-01

    The paper discusses a methodology for total impact assessment of energy systems, ideally evaluating all the impacts that a given energy system has on the society in which it is imbedded or into which its introduction is being considered. Impacts from the entire energy conversion chain ('fuel cycle' if the system is fuel-based), including energy storage, transport and transmission, as well as the institutions formed in order to manage the system, should be compared on the basis of the energy service provided. A number of impacts are considered, broadly classified as impacts on satisfaction of biological needs, on health, on environment, on social relations and on the structure of society. Further considerations include impacts related to cost and resilience, and, last but not least, impacts on global relations. The paper discusses a number of published energy studies in the light of the comparative impact assessment methodology outlined above. (author)

  19. Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama

    Science.gov (United States)

    1980-01-01

    The solar energy system installed at the Huntsville Senior Citizen Center is described. Detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are presented.

  20. Preliminary design for spent fuel canister handling systems in a canister transfer and installation vehicle

    International Nuclear Information System (INIS)

    Wendelin, T.; Suikki, M.

    2008-12-01

    . After this the bentonite top blocks can be laid on top of the spent fuel canister. The blocks act also as a radiation protection. The main dimensions of a tracked vehicle intended for fuel canister disposal are 7.9 m x 2.9 m x 3.2 m during a transport operation and 9.6 m x 2.9 m x 4.0 m during an installation operation. The power unit comprises a 240 kW diesel engine with a hydraulic power transmission to the tracks. The payload is about 60 t and the vehicle's mass is about 20 t, resulting in a total weight of about 80 t. The total cost estimate, not including VAT, for completing the system came to 1 500 000 euros, of which 400 000 euros were planning costs and 1 100 000 euros were installation as well as manufacturing costs. (orig.)

  1. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  2. A new fire alarm system for electrical installations

    CERN Document Server

    Pietersen, A H

    1978-01-01

    Fires in electrical installations are considered to develop in four phases - initiation, smouldering, flame formation and heat development. Cables are among the more sensitive components, with working temperatures around 50 degrees C and fire detection at 70 degrees C. Conventional alarms include smoke detectors. The new technique described uses microcapsules containing powder forming a gas of the Freon type after diffusion. A typical microcapsule loses 4% per year and has a natural life of 10 years. Fabrication methods are described. Detection is by gas concentration, with a sensitivity of 1 to 10 ppm, or by acoustic methods with microphones to pick up the sound of fractures. Pressure/temperature characteristics of various types of Freon mixtures commercially available are given in graphical form.

  3. Argonne National Laboratory's photo-oxidation organic mixed waste treatment system - installation and startup testing

    International Nuclear Information System (INIS)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-01-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig

  4. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  5. Design and installation of a system of quality for the specialized services of irradiation

    International Nuclear Information System (INIS)

    Rodriguez, Y.; Romero, M.; Castillo, E.; Villoch, A.; Cruz, S.

    1999-01-01

    This study is traced as objective the the design and installation of a System of Quality of agreement to the norm ISO 9002 and the NC-ISO/IEC Guide 25. For this a program was elaborated that it embraced the following phases: organization, installation and maintenance of the system. The elements that would conform the whole program of quality of the irradiation services they would be given from the qualification of the material to process until the certification of the dose imparted to the product; as well as the internal and external control of the quality in the own one installation

  6. Installation of a Wastewater SCADA Monitoring System at Fort Bragg, NC

    National Research Council Canada - National Science Library

    Mullaney, Joe

    2004-01-01

    .... The Wastewater SCADA Monitoring System was installed to monitor 26 remote sites. A detailed radio study of the area verified the feasibility of using radio equipment to transfer data from these sites...

  7. Caregivers’ Use of Child Passenger Safety Resources and Quality of Future Child Restraint System Installations

    Directory of Open Access Journals (Sweden)

    Jessica H. Mirman

    2017-10-01

    Full Text Available Objectives: Child Restraint System (CRS misuse is common. We characterized caregivers’ use of child passenger safety informational and instructional resources and determined whether there were differences in the quality of CRS installations associated with prior exposure to specific resources as evaluated in a standardized CRS installation environment. Methods: Caregivers completed self-report surveys and installed a forward-facing CRS in a controlled environment. Installations were evaluated for security (tightness and accuracy (no errors by a child passenger safety technician (CPST. Results: CRS manuals were the most common way caregivers learned to install a CRS. Primary care providers (PCPs were the most frequently endorsed source of CRS safety information. There was no strong pattern of associations between prior exposure to resources and installation quality (security or accuracy, although some evidence supports protective effects of learning from CPSTs; 13% (19 out of 151 installations were secure and 57% (86 out of 151 installations were accurate. Conclusions: A focus on developing effective and lasting behavioral interventions is needed.

  8. The installation of a multiport ground-water sampling system in the 300 Area

    International Nuclear Information System (INIS)

    Gilmore, T.J.

    1989-06-01

    In 1988, the Pacific Northwest Laboratory installed a multiport groundwater sampling system in well 399-1-20, drilled north of the 300 Area on the Hanford Site in southwestern Washington State. The purpose of installing the multiport system is to evaluate methods of determining the vertical distribution of contaminants and hydraulic heads in ground water. Well 399-1-20 is adjacent to a cluster of four Resource Conservation and Recovery Act (RCRA) ground-water monitoring wells. This proximity makes it possible to compare sampling intervals and head measurements between the multiport system and the RCRA monitoring wells. Drilling and installation of the multiport system took 42 working days. Six sampling ports were installed in the upper unconfined aquifer at depths of approximately 120, 103, 86, 74, 56, and 44 feet. The locations of the sampling ports were determined by the hydrogeology of the area and the screened intervals of adjacent ground-water monitoring wells. The system was installed by backfilling sand around the sampling ports and isolating the ports with bentonite seals. The method proved adequate. For future installation, however, development and evaluation of an alternative method is recommended. In the alternative method suggested, the multiport system would be placed inside a cased and screened well, using packers to isolate the sampling zones. 4 refs., 8 figs., 1 tab

  9. Installation of wireless LAN system into the SuperKEKB accelerator tunnel

    International Nuclear Information System (INIS)

    Iwasaki, Masako; Satoh, Masanori

    2014-01-01

    We have installed a wireless LAN system of the accelerator control network into the accelerator tunnel for SuperKEKB, which is the upgrade plan of the KEKB B-factory project. The wireless LAN system is used for the construction and maintenance of the accelerator components. The leaky coaxial cable (LCX) antennas are installed into the arc sections of SuperKEKB tunnel, and the collinear antennas are installed into the straight sections and the injector Linac. We have selected the LCX and collinear antennas with good radiation hardness of more than 1 MGy. After the installation, we evaluated the wireless LAN system and obtained the good network speed performance in the whole tunnel area. (author)

  10. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  11. Guidelines for safety related telecommunications systems on normally unattended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally unattended offshore installations associated with oil and gas production on the United Kingdom continental shelf. The guidelines are mainly concerned with ensuring that: while the installation is unattended, its operation can be remotely monitored and controlled effectively to prevent the escalation of any abnormal situation; the installation can be safely approached when it is necessary to transfer personnel on board; persons on board, for example for inspection or maintenance activities, are safe. (UK)

  12. The effectiveness of the installation of a mobile voice communication system in a university hospital.

    Science.gov (United States)

    Hanada, Eisuke; Fujiki, Tadayoshi; Nakakuni, Hideaki; Sullivan, Corbet Vernon

    2006-04-01

    In large hospitals, collaborative clinical practice is currently emphasized, with members of various departments expected to work as a team. The importance of accurate communication among the team members is of utmost importance. To improve such communication, the introduction of mobile voice communication systems has received much attention in Japan. Shimane University Hospital also introduced a Personal Handy-phone System (PHS) for doctors. In the traditional setting, much time was wasted searching for doctors through multiple calls on fixed-line telephones. In order to measure the effectiveness of our system, the change in the number of calls made on fixed-line telephones before and after PHS installation was compared. The total number of calls was reduced by more than 35%, and the number of calls to the wards on weekdays was reduced by half. Mobile telecommunication systems with small output power, such as PHS, are known to cause little interference with medical devices which makes it possible to use mobile voice communication safely in hospitals. The improvement in communication by this systems resulted in an improvement in labor efficiency.

  13. Thermoelectric generator installation at Divide Road Weather Information Systems (RWIS).

    Science.gov (United States)

    2016-04-13

    The Department of Transportation and Public Facilities (DOT&PF) has a network of Road Weather Information System (RWIS) environmental sensor stations (ESS) deployed along the road network. Six of the stations do not have access to commercial power an...

  14. Investigation on Prefabricated Building System Skilled Component Installers

    OpenAIRE

    Nurul Rezuana Buyung; Md Azree Othuman Mydin; Abdul Naser Abdul Ghani

    2013-01-01

    In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS) has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precisi...

  15. Integrated control and diagnostic system architectures for future installations

    International Nuclear Information System (INIS)

    Wood, R.; March-Leuba, J.

    2000-01-01

    Nuclear reactors of the 21st century will employ increasing levels of automation and fault tolerance to increase availability, reduce accident risk, and lower operating costs. Key developments in control algorithms, fault diagnostics, fault tolerance, and distributed communications are needed to implement the fully automated plant. It will be equally challenging to integrate developments in separate information and control fields into a cohesive system, which collectively achieves the overall goals of improved safety, reliability, maintainability, and cost-effectiveness. Under the Nuclear Energy Research Initiative (NERI), the US Department of Energy is sponsoring a project to address some of the technical issues involved in meeting the long-range goal of 21st century reactor control systems. This project involves researchers from Oak Ridge National Laboratory, the University of Tennessee, and North Carolina State University. The research tasks under this project focus on some of the first-level breakthroughs in control design, diagnostic techniques, and information system design that will provide a path to enable the design process to be automated in the future. This paper describes the conceptual development of an integrated nuclear plant control and information system architecture, which incorporates automated control system development that can be traced to a set of technical requirements. The expectation is that an integrated plant architecture with optimal control and efficient use of diagnostic information can reduce the potential for operational errors and minimize challenges to the plant safety systems

  16. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  17. Design, installation and operating experience of 20 photovoltaic medical refrigerator systems on four continents

    Science.gov (United States)

    Hein, G. F.

    1982-01-01

    The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.

  18. ZT-40M system design, modification, and installation

    International Nuclear Information System (INIS)

    Hammer, C.F.

    1981-01-01

    ZT-40 is a reversed field pinch experiment which had been operated as originally designed, with a ceramic discharge tube until November 1980. At that time, the experiment was shut down for major modifications. This paper will describe these modifications in general and discuss in detail the design of the energy system

  19. 14 CFR 29.1309 - Equipment, systems, and installations.

    Science.gov (United States)

    2010-01-01

    ... take appropriate corrective action. Systems, controls, and associated monitoring and warning means must... malfunctions and damage from external sources; (2) The probability of multiple failures and undetected failures; (3) The resulting effects on the rotorcraft and occupants, considering the stage of flight and...

  20. 14 CFR 25.1309 - Equipment, systems, and installations.

    Science.gov (United States)

    2010-01-01

    ... take appropriate corrective action. Systems, controls, and associated monitoring and warning means must... malfunctions and damage from external sources. (2) The probability of multiple failures and undetected failures. (3) The resulting effects on the airplane and occupants, considering the stage of flight and...

  1. Solar heating and domestic hot water system installed at North Dallas High School

    Science.gov (United States)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  2. Solar heating and hot water system installed at Alderson Broaddus College, Philippi, West Virginia

    Science.gov (United States)

    1981-01-01

    Data needed necessary to evaluate the design and operation of a solar energy heating and hot water system installed in a commercial application are presented. The information includes system descriptions, acceptance test data, schematics, as built drawing, problems encountered, all solutions and photographs of the system at various stages of completion.

  3. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric

  4. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    International Nuclear Information System (INIS)

    Bocchino, W.M.; Burson, B.

    1997-01-01

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher's ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall

  5. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  6. Assembly, installation and commissioning of the JET-EP Halo Current Sensors system

    International Nuclear Information System (INIS)

    Peruzzo, S.; Grando, L.; Pomaro, N.; Sonato, P.; Fullard, K.; Huntley, S.; Lam, N.; Riccardo, V.

    2006-01-01

    The Halo Current Sensors (HCS) system has been developed under the JET-EP enhancement programme, to allow a more detailed study of the Halo Currents flowing in the upper part of the JET vessel. A better understanding of the origin, distribution and scaling of Halo Currents in tokamaks is one of the critical issues for any next step device, like the ITER project, in particular for the design of the plasma facing components and for a reliable plasma operation at high performances. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, each containing up to eight Rogowski coils and two toroidal field pick-up coils. The Rogowski coils are designed to directly measure the current flowing through the tiles of the upper dump plate, whereas the toroidal field pick-up coils are conceived to give an estimate the total poloidal Halo Current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/05 Shutdown and started the acquisition of signals during the restart phase of the machine in autumn 2005. This paper will highlight and discuss the critical aspects and the lessons learned during the final phase of the procurement of the system; the in-vessel installation, accomplished by means of remote handling system, and the pre-commissioning tests executed on the system will be described in detail. The paper will then focus on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns. Since the beginning of operation the HCS signals showed the effects of several noise sources, increased by the low sensitivity of the probes, due to design geometrical constraints. The expected pick-up of stray magnetic fields was quite easily compensated through a correlation with other existing magnetic diagnostics. Moreover the

  7. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  8. Solar heating and cooling system installed at Leavenworth, Kansas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Perkins, R. M.

    1980-06-01

    The solar heating and cooling system installed at the headquarters of Citizens Mutual Savings Association in Leavenworth, Kansas, is described in detail. The project is part of the U.S. Department of Energy's solar demonstration program and became operational in March, 1979. The designer was TEC, Inc. Consulting Engineers, Kansas City, Missouri and contractor was Norris Brothers, Inc., Lawrence, Kansas. The solar system is expected to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2200 square feet. Five, 3-ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3000 gallon chilled water storage tank. Two, 3000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

  9. An automatic system for controlling the quality of straws installed in the ATLAS TRT detector

    CERN Document Server

    Golunov, A O; Gousakov, Yu V; Kekelidze, G D; Livinski, V V; Mouraviev, S V; Parzycki, S S; Peshekhonov, V D; Price, M J; Savenkov, A A

    2004-01-01

    This article describes an automatic system to control the quality of straws installed in the wheels of the end-cap Transition Radiation Tracker of the ATLAS experiment. The system tests both the straightness and the electrical insulation of the straws during installation. The testing time per straw is 9s; consequently it takes about 2h to measure one layer of straws. The off-line analysis takes 20s per straw. With this system defects can be immediately detected and corrected. This clearly influences the future performance of the detector.

  10. Looking beyond installation: Why households struggle to make the most of solar hot water systems

    International Nuclear Information System (INIS)

    Gill, Nicholas; Osman, Peter; Head, Lesley; Voyer, Michelle; Harada, Theresa; Waitt, Gordon; Gibson, Chris

    2015-01-01

    This paper examines household responses to sustainability issues and adoption of energy saving technologies. Our example of solar hot water systems highlights the complexity and variability of responses to low-carbon technologies. While SHW systems have the potential to provide the majority of household hot water and to lower carbon emissions, little research has been done to investigate how SHW systems are integrated into everyday life. We draw on cultural understandings of the household to identify passive and active users of SHW systems and utilize a model that illustrates how technology use is dependent on inter-relations between cultural norms, systems of provision, the material elements of homes, and practice. A key finding is that households can be ill-prepared to make the most of their SHW systems and lack post-installation support to do so. Thus, informed and efficient use of SHW systems is hit and miss. Current policy is largely aimed at subsidizing purchase and installation on the assumption that this is sufficient for emission reduction goals. Our analysis provides evidence to the contrary. Areas we highlight for policy and practice improvement are independent pre-purchase advice, installation quality, and practical guidance on system operation and interaction with patterns of hot water use. - Highlights: • We interview Australian households about their experience with SHW systems. • We identify active and passive users of SHW. Active users tend to be dissatisfied with their system. • Passive users tend to be satisfied but have relatively inefficient systems. • Householders struggle to integrate hot water use and system operation, compromising efficiency. • Policy should encompass pre and post-installation support as much as incentives to install.

  11. The electric energy produced by photovoltaic systems connected to the national electric network: own disadvantages taken from the experiences of the systems installed in Guantanamo

    International Nuclear Information System (INIS)

    Mila Raymond, Ramón

    2017-01-01

    The work addresses the experience of installing photovoltaic systems connected to the grid using the available spaces on the roofs of buildings such as the Copextel Territorial Division in Guantánamo, MININT Headquarters and General Teaching Hospital Dr. Agostinho Neto. 36 solar panels of polycrystalline silicon, of 250 Wp for a total of 9KWp, were installed in the Territorial Division of Copextel in Guantánamo with an inverter SB7000 US, generating 2951 KWh in 1071 hours, for an average of 33 KWh daily, were left of Emit 2.47t of CO2 to the atmosphere. In the MININT the installation of 120 photovoltaic modules of monocrystalline silicon and 165Wp, 60 for each inverter SB7000US was carried out and generated until April 3, 8022 KWh in 1166 hours (3.5 months) 76.4 KWh per day and they stopped to emit 8t of CO2. At the General Teaching Hospital Dr. Agustino Neto a 25 kWp system was installed and another 25 KWp system was installed with Sunny Tripower STP25000TL-30 inverters. (author)

  12. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  13. 40 CFR 264.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ..., Partially Buried, or Submerged Liquid Storage Systems,” and the American Petroleum Institute (API... physical damage and excessive stress due to settlement, vibration, expansion, or contraction. [Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615...

  14. Licensing system for primary category radioactive installations; Sistema de licenciamiento de instalciones radiactivas de primera categoria

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Riquelme, Angelica Beatriz

    1998-12-31

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission`s Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population`s health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system`s elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author) Dissertation to obtain the degree of Computing and Informatics Engineer; 10 refs., 48 figs., 34 tabs.

  15. Experience in installing a microprocessor-based protection system on a UK nuclear power plant

    International Nuclear Information System (INIS)

    Jones, C.D.; Smith, I.C.

    1993-01-01

    This paper describes a recently completed project to install a microprocessor-based reactor protection system on a twin reactor station in the United Kingdom. This represented the first application of digital technology as part of such a system in the UK. The background of the application and details of the chosen solution are provided. The experience gained during the installation, commissioning and early operation of the equipment is reviewed by the operators. Interactions between the utility and the regulatory body are outlined and the impact of the regulatory process on the utility's resources and the project timescales are discussed

  16. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Science.gov (United States)

    2010-04-01

    ...(a)(1) through (5). (c) Provisions for future installation of electric clothes dryers. When wiring is... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All...

  17. Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Schenkman, Benjamin L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.

  18. Flow Simulation of Modified Duct System Wind Turbines Installed on Vehicle

    Science.gov (United States)

    Rosly, N.; Mohd, S.; Zulkafli, M. F.; Ghafir, M. F. Abdul; Shamsudin, S. S.; Muhammad, W. N. A. Wan

    2017-10-01

    This study investigates the characteristics of airflow with a flow guide installed and output power generated by wind turbine system being installed on a pickup truck. The wind turbine models were modelled by using SolidWorks 2015 software. In order to investigate the characteristic of air flow inside the wind turbine system, a computer simulation (by using ANSYS Fluent software) is used. There were few models being designed and simulated, one without the rotor installed and another two with rotor installed in the wind turbine system. Three velocities being used for the simulation which are 16.7 m/s (60 km/h), 25 m/s (90 km/h) and 33.33 m/s (120 km/h). The study proved that the flow guide did give an impact to the output power produced by the wind turbine system. The predicted result from this study is the velocity of the air inside the ducting system of the present model is better that reference model. Besides, the flow guide implemented in the ducting system gives a big impact on the characteristics of the air flow.

  19. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  20. 21 CFR 862.1710 - Total triiodothyronine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Total triiodothyronine test system. 862.1710... Systems § 862.1710 Total triiodothyronine test system. (a) Identification. A total triiodothyronine test system is a device intended to measure the hormone triiodothyronine in serum and plasma. Measurements...

  1. Industrial process. Solartron installs the KME measuring and testing system at Civaux

    International Nuclear Information System (INIS)

    Foucher, N.

    1997-01-01

    The Solartron company wined the European call for offer of EdF/CNEPE for the installation of the KME measuring and testing system on the first unit of the Civaux nuclear power plant (France). This system is based on the IMP centralized measurement system, the SNET network and a SNET/ETHERNET interface. Measurement electronic devices are installed in the vicinity of the sensors which reduces the costs and the wires length. Logical and analogical data acquisition is performed by 35 IMP systems which can be connected to 72 different points. The communication with the PATERN data management system is performed by a second independent ETHERNET network. This system ensures the database management and the calculation of the thermodynamical, mechanical and electrical parameters. (J.S.)

  2. Predictive parameters of Legionella pneumophila occurrence in hospital water: HPCs and plumbing system installation age.

    Science.gov (United States)

    Ghanizadeh, Ghader; Mirmohamadlou, Ali; Esmaeli, Davoud

    2016-09-01

    Occurrence of Legionella pneumophila can be relevant to the installation age and the presence of heterotrophic plate counts (HPCs). This research illustrates L. pneumophila contamination of hospital water in accordance with the installation age and the presence of HPCs. One hundred and fifty samples were collected from hot and cold water systems and cultured on R2A and BCYE agar. L. pneumophila identification was done via specific biochemical tests. HPCs and L. pneumophila were detected in 96 and 37.3 % of the samples, respectively. The mean of HPCs density was 947 ± 998 CFU/ml; therefore, 52 % of the samples had higher densities than 500 CFU/ml. High densities of HPCs (>500 CFU/ml) led to colonization of L. pneumophila (≥1000 CFU/ml), mainly observed in cooling systems, gynecological, sonography, and NICU wards. Chi(2) test demonstrated that higher densities (>500 CFU/ml) of HPCs and L. pneumophila contamination in cold water were more frequent than warm water (OR: 2.3 and 1.49, respectively). Univariate regressions implied a significant difference between HPCs density and installation age in positive and negative tests of L. pneumophila (OR = 1.1, p installation age on L. pneumophila occurrences (p installation age (r s  = 0.33, p installation age are relevant; so, plumbing system renovation with appropriate materials and promotion of the effective efforts for hospital's water quality assurance is highly recommended.

  3. System performance of a three-phase PV-grid-connected system installed in Thailand. Data monitored analysis

    International Nuclear Information System (INIS)

    Boonmee, Chaiyant; Watjanatepin, Napat; Plangklang, Boonyang

    2009-01-01

    PV-grid-connected systems are worldwide installed because it allows consumer to reduce energy consumption from the electricity grid and to feed the surplus energy back into the grid. The system needs no battery so therefore the system price is very cheap comparing to other PV systems. PV-grid-connected systems are used in buildings that already hooked up to the electrical grid. Finding efficiency of the PV-grid-connected system can be done by using a standard instrument which needs to disconnect the PV arrays from the grid before measurement. The measurement is also difficult and we lose energy during the measurement. This paper will present the system performance of a PV-grid-connected system installed in Thailand by using a monitoring system. The monitored data are installed by acquisition software into a computer. Analysis of monitored data will be done to find out the system performance without disconnecting the PV arrays from the system. The monitored data include solar radiation, PV voltage, PV current, and PV power which has been recorded from a 5 kWp system installed of amorphous silicon PV at Rajamangala University of Technology Suvarnabhumi, Nonthaburi, Thailand. The system performance of the system by using the data monitored is compared to the standard instrument measurement. The paper will give all details about system components, monitoring system, and monitored data. The result of data analysis will be fully given. (author)

  4. Investigations on installation of the heat exchange system in geothermal wells; Chinetsu koseinai netsukokan system donyu ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The heat exchange system in geothermal wells is a system that replaces the air source heat pump and uses underground beds or groundwater as a heat source to heat rooms by collecting underground heat in winter, and cool rooms in summer by operating a heat media circuit in reverse direction through the action of a reverse flow valve to discharge heat underground. This paper describes feasibility investigations on the system including its technical trend for introducing the system technology. Technological and economic discussions were given by classifying the intra-well heat exchange device in its installation direction (horizontal loop type and vertical installation type), underground heat exchange media (antifreeze solution/water cyclic system and direct expansion system), and underground heat transfer (heat conduction system and heat convection system). As a result of discussing each system, it was concluded that the following two systems are promising: A = vertical installation, antifreeze solution/water cyclic and heat conduction system, and B = vertical installation, antifreeze solution/water cyclic and heat convection system. Since the system B was found to have better efficiency and economy among both systems, it is necessary to verify an intra-well heat exchange system and operation methods that suit the system B effectively. 21 refs., 8 tabs.

  5. Solar heating and hot water system installed at Cherry Hill, New Jersey

    Science.gov (United States)

    1979-01-01

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  6. The influence of potential exposure to radiation protection system of accelerator installation TESLA

    International Nuclear Information System (INIS)

    Orlic, M.; Cuknic, O.

    2000-01-01

    Potential exposure of individuals at big nuclear machines like Accelerator Installation Tesla (AIT) generates direct requirements to reliability of radiation protection system. Starting from technical characteristics of AlT and international recommendation concerning potential exposure and the probability of death has been calculated. The reference risk has been specified. Comparing then we calculated the probability of the failure of the protective system. The reliability of the system has to be better (author)

  7. 30 CFR 75.1103-4 - Automatic fire sensor and warning device systems; installation; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... systems that use carbon monoxide sensors shall provide identification of fire along all belt conveyors. (1... downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the...

  8. Some mathematical aspects of creation of the control system for a physical installation

    International Nuclear Information System (INIS)

    Efimov, K.M.; Efimova, T.E.; Zagurskij, A.B.

    1988-01-01

    The article presented is a result of investigations connected to the problems of the software creation for the linear accelerator automatic control system. The problems considered arise before each scientific group engaged in the development of the automatic control complex for a physical installation. The possible ways of solving such problems are discussed

  9. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  10. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  11. Testing an Open Source installation and server provisioning tool for the INFN CNAF Tierl Storage system

    International Nuclear Information System (INIS)

    Pezzi, M; Favaro, M; Gregori, D; Ricci, P P; Sapunenko, V

    2014-01-01

    In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.

  12. Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, Kristen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Feldman, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ong, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-11-01

    This report presents results from the first U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs—often referred to as “business process” or “soft” costs—for residential and commercial photovoltaic (PV) systems. Annual expenditure and labor-hour-productivity data are analyzed to benchmark 2010 soft costs related to the DOE priority areas of (1) customer acquisition; (2) permitting, inspection, and interconnection; (3) installation labor; and (4) installer labor for arranging third-party financing. Annual expenditure and labor-hour data were collected from 87 PV installers. After eliminating outliers, the survey sample consists of 75 installers, representing approximately 13% of all residential PV installations and 4% of all commercial installations added in 2010. Including assumed permitting fees, in 2010 the average soft costs benchmarked in this analysis total $1.50/W for residential systems (ranging from $0.66/W to $1.66/W between the 20th and 80th percentiles). For commercial systems, the median 2010 benchmarked soft costs (including assumed permitting fees) are $0.99/W for systems smaller than 250 kW (ranging from $0.51/W to $1.45/W between the 20th and 80th percentiles) and $0.25/W for systems larger than 250 kW (ranging from $0.17/W to $0.78/W between the 20th and 80th percentiles). Additional soft costs not benchmarked in the present analysis (e.g., installer profit, overhead, financing, and contracting) are significant and would add to these figures. The survey results provide a benchmark for measuring—and helping to accelerate—progress over the next decade toward achieving the DOE SunShot Initiative’s soft-cost-reduction targets. We conclude that the selected non-hardware business processes add considerable cost to U.S. PV systems, constituting 23% of residential PV system price, 17% of small commercial system price, and 5% of large commercial system price (in 2010

  13. 5th Total System Performance Assessment Workshop

    International Nuclear Information System (INIS)

    Hwang, Yong Soo; Lee, Youn Myoung; Kang, Chul Hyung; Lee, Sung Ho

    2009-07-01

    Research items on safety assessment of high-level waste repository have been proposed by external invited experts outside KAERI and discussed extensively during the annual 5th performance assessment workshop prepared by safety assessment group in KAERI. This could be useful to set up R and D plans necessary for the next phase of mid- and long-term reaserch area regarding the safety assessment of high-level waste repository. Through the research and the presentation, HLW-related research and development area including such specific research items as current status of HLW safety assessment research, current requirement for the licensing of the repository system, priority on research area, data base building for the safety assessment, source-term modeling as well as safety case, among many others, have been discussed and summarized

  14. Analysis of financial support for photovoltaic system installation with the economic simulation model

    International Nuclear Information System (INIS)

    Imamura, E.; Uchiyama, Y.

    1994-01-01

    The authors developed a penetration method of dispersed generation technologies and tried to investigate economic simulation on photovoltaic systems. The model is composed of several analysis modules; a technology application module, a regional meteorology module, cost modules such as capital cost, power generation cost, marginal cost and avoided cost, and a logistic penetration module. The database management system of application forms, meteorological data, energy demand and equipment costs is also developed to support the model. The main purpose of the study is to make clear impacts to the power supply configuration and cost/benefit effects when PV systems are installed into several different sectors in Japan. The ultimate potential of PV system is 235, 103MWp and its market potential is 15,172 MWp in Japan. Market penetration highly depends on cost learning factors of several components of PV system. The installed capacity with 50% subsidy is 5 times larger than that with 67%. In conclusion, it is feasible for government or utilities to financially support the promotion and installation of PV systems as the electricity supply system

  15. The modularization construction of piping system installation in AP1000 plant

    International Nuclear Information System (INIS)

    Lu Song; Wang Yuan; Wei Junming

    2012-01-01

    Modularization construction is the main technique used in AP1000 plants, the piping Modularization installation will impact directly to the module construction as the important part of the Modularization construction. After the piping system has took the modularization design in AP1000 plants, some installation works of piping system has moved from the site to fabrication shop. With improving the construction quality and minimizing the time frame of project, the critical paths can be optimized. This paper has analyzed the risk and challenge that met during the modularization construction period of piping systems though introducing the characteristic of modularization construction for AP1000 piping systems, and get construction experiences from the First AP1000 plants in the world, then it will be the firmly basics for the wide application of modularization construction in the future. (authors)

  16. The year 2000 embedded systems problem to maintain the safety of nuclear installations

    International Nuclear Information System (INIS)

    Ardisasmita, M.S.

    1999-01-01

    The Y2K problem may impact on nuclear installations in a number of ways because embedded systems are used in nuclear routine operation, monitoring and control system. The very simplest embedded systems are capable of performing only a single function or set of functions to meet a single predetermined purpose. In more complex systems the functioning of the embedded system is determined by an application program that enables the embedded system to be used for a particular purpose in a specific application. The simplest devices consist of a single microprocessor which may itself be packaged with other chips in a hybrid system or Application Specific Integrated Circuit (ASIC). Its input comes from a detector or sensor and its output goes to a switch or activator which may start or stop the operation of a positioning motors or, by operating a valve, may control the flow of cooling system to reactor core. Embedded systems in our organization are also be found in Batan security systems. These include systems for the security of buildings and premises, and in the communication systems on which these depend. In the enclosed paper we demonstrate the use of analytic model and reliability analysis. The subject of this reliability test is to detect the components of the embedded system with PLC's that could fail on Y2K problem in nuclear installation and safety system. (author)

  17. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    Science.gov (United States)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  18. Building system technology with installation bus. Planning now for the future; Gebaeudesystemtechnik - mit Installationsbus. Heute schon an morgen denken

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, D. [RWE Energie AG, Essen (Germany)

    1995-12-31

    In chapter 16 of the anthology about building technology the building system technology with installation bus is described. The following aspects are discussed: limits of the conventional electric installation, building system technology, building system technology - illusion or reality?; The European Installation Bus Association (EIBA). (BWI) [Deutsch] Kapitel 16 des Sammelbandes ueber Building Control ist dem Thema der Gebaeudesystemtechnik mit Installationsbus gewidmet. In diesem Zusammenhang werden folgende Themenbereiche angesprochen: Grenzen der konventionellen Elektroinstallation; Gebaeudesystemtechnik; Gebaeudesystemtechnik - Illusion oder Realitaet?; Die EIBA (European Installation Bus Association). (BWI)

  19. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    Energy Technology Data Exchange (ETDEWEB)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  20. Solar heating and hot water system installed at Southeast of Saline, Unified School District 306, Mentor, Kansas

    Science.gov (United States)

    1979-01-01

    The solar system, installed in a new building, was designed to provide 52 percent of the estimated annual space heating load and 84 percent of the estimated annual potable hot water requirement. The liquid flat plate collectors are ground-mounted and cover a total area of 5125 square feet. The system will provide supplemental heat for the school's closed-loop water-to-air heat pump system and domestic hot water. The storage medium is water inside steel tanks with a capacity of 11,828 gallons for space heating and 1,600 gallons for domestic hot water. The solar heating facility is described and drawings are presented of the completed system which was declared operational in September 1978, and has functioned successfully since.

  1. The calibration procedure of the radiation monitoring system installed in radiation controlled area of KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sung-Kyun; Min, Yi-Sub; Park, Jeong-Min; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2016-10-15

    The spaces, where these accelerators are installed, are defined as the radiation controlled area and the levels of the radiation in this area are monitored by the radiation monitoring system (RMS) to protect radiation workers and experiment users from the hazards of the ionizing radiation and the surface and air contamination tests are carried out periodically by the radiation secure team. The most of RMS instruments are installed in the accelerator building, where the 100-MeV proton linear accelerator is installed. All detectors of RMS should be calibrated every year to prove the reliability of RMS and almost all instruments for RMS was calibrated during this summer maintenance period of KOMAC this year. Almost all RMS instruments installed in KOMAC is calibrated between 2016-07-13 and 2016-08-24. As the calibration result, if the current reading value are within the 5% of the reference dose rate value, this RMS instrument can be used one more year. Otherwise, the detector of that RMS instrument should be repaired or replaced. The self-calibration certificate for each RMS instrument will be published only for the instrument to satisfy the condition.

  2. INSTALLING AN ERP SYSTEM WITH A METHODOLOGY BASED ON THE PRINCIPLES OF GOAL DIRECTED PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ioannis Zafeiropoulos

    2010-01-01

    Full Text Available This paper describes a generic methodology to support the process of modelling, adaptation and implementation (MAI of Enterprise Resource Planning Systems (ERPS based on the principles of goal directed project management (GDPM. The proposed methodology guides the project manager through specific stages in order to successfully complete the ERPS implementation. The development of the proper MAI methodology is deemed necessary because it will simplify the installation process of ERPS. The goal directed project management method was chosen since it provides a way of focusing all changes towards a predetermined goal. The main stages of the methodology are the promotion and preparation steps, the proposal, the contract, the implementation and the completion. The methodology was applied as a pilot application by a major ERPS development company. Important benefits were the easy and effective guidance for all installation and analysis stages, the faster installation for the ERPS and the control and cost reduction for the installation, in terms of time, manpower, technological equipment and other resources.

  3. Tennessee Valley Authority becomes first to install digital process protection system

    International Nuclear Information System (INIS)

    Miller, W.; Doyle, J.

    1991-01-01

    Westinghouse Pressurized Water Reactors were originally furnished with analog process protection equipment of various vintages. The older equipment is quickly reaching the point of obsolescence, becoming costly to maintain and operate, its qualification increasingly difficult to achieve. Newer digital-based systems offer improved performance, automatic calibration, and streamlined surveillance test features, as discussed here. For these reasons, the Tennessee Valley Authority installed the world's first digital process protection system, complete with automatic test and calibration features, in its Sequoyah units 1 and 2 last year. The US utility replaced its ageing analog system with Westinghouse Electric's Eagle 21 Process Protection System during a routine maintenance shutdown in a record 23 days. (author)

  4. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    Energy Technology Data Exchange (ETDEWEB)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  5. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    Science.gov (United States)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  6. Installation of laboratory scale flue gas treatment system at ALURTRON, MINT

    International Nuclear Information System (INIS)

    Siti A'iasah Hashim; Khairul Zaman Dahlan; Zulkafli Ghazali; Khomsaton Abu Bakar, Ayub Muhamad

    2002-01-01

    A laboratory scale test rig to treat simulated flue gas using electron beam technology was installed at the Alurtron EB-irradiation center, MINT. The experiment test rig was proposed as a result of a feasibility studies conducted jointly by IAEA, MINT and TNB Research in 1997. The test rig system consisted of several components, among other, diesel generator, gas analyzers and spray cooler. The installation was completed and commissioned in October 2001. Results from the commissioning test runs and subsequent experimental work showed that the efficiency of the gas treatment is high. It was proven that electron beam technology might be applied in the treatment of air pollutants. This paper describes the design and work function of the individual major components as well as the full system function. Results from the initial experimental works are also presented. (Author)

  7. A study on the nuclear computer codes installation and management system

    International Nuclear Information System (INIS)

    Kim, Yeon Seung; Huh, Young Hwan; Kim, Hee Kyung; Kang, Byung Heon; Kim, Ko Ryeo; Suh, Soong Hyok; Choi, Young Gil; Lee, Jong Bok

    1990-12-01

    From 1987 a number of technical transfer related to nuclear power plant had been performed from C-E for YGN 3 and 4 construction. Among them, installation and management of the computer codes for YGN 3 and 4 fuel and nuclear steam supply system was one of the most important project. Main objectives of this project are to establish the nuclear computer code management system, to develop QA procedure for nuclear codes, to secure the nuclear code reliability and to extend techanical applicabilities including the user-oriented utility programs for nuclear codes. Contents of performing the project in this year was to produce 215 transmittal packages of nuclear codes installation including making backup magnetic tape and microfiche for software quality assurance. Lastly, for easy reference about the nuclear codes information we presented list of code names and information on the codes which were introduced from C-E. (Author)

  8. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    Energy Technology Data Exchange (ETDEWEB)

    Andrea Wilkerson, Gregory P Sullivan, Robert G Davis, Sarah Safranek

    2018-04-30

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding the long-term performance of LED lighting systems in high-temperature environments.

  9. A Framework to Survey the Energy Efficiency of Installed Motor Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rao, Prakash; Hasanbeigi, Ali; McKane, Aimee

    2013-08-01

    While motors are ubiquitous throughout the globe, there is insufficient data to properly assess their level of energy efficiency across regional boundaries. Furthermore, many of the existing data sets focus on motor efficiency and neglect the connected drive and system. Without a comprehensive survey of the installed motor system base, a baseline energy efficiency of a country or region’s motor systems cannot be developed. The lack of data impedes government agencies, utilities, manufacturers, distributers, and energy managers when identifying where to invest resources to capture potential energy savings, creating programs aimed at reducing electrical energy consumption, or quantifying the impacts of such programs. This paper will outline a data collection framework for use when conducting a survey under a variety of execution models to characterize motor system energy efficiency within a country or region. The framework is intended to standardize the data collected ensuring consistency across independently conducted surveys. Consistency allows for the surveys to be leveraged against each other enabling comparisons to motor system energy efficiencies from other regions. In creating the framework, an analysis of various motor driven systems, including compressed air, pumping, and fan systems, was conducted and relevant parameters characterizing the efficiency of these systems were identified. A database using the framework will enable policymakers and industry to better assess the improvement potential of their installed motor system base particularly with respect to other regions, assisting in efforts to promote improvements to the energy efficiency of motor driven systems.

  10. Cooling performance of a vertical ground-coupled heat pump system installed in a school building

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yujin; Lee, Jae-Keun; Jeong, Young-Man; Koo, Kyung-Min [Department of Mechanical Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea); Lee, Dong-Hyuk; Kim, In-Kyu; Jin, Sim-Won [LG Electronics, 391-2 Gaeumjeong-dong, Changwon City, Gyeongnam (Korea); Kim, Soo H. [Department of Nanosystems and Nanoprocess Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea)

    2009-03-15

    This paper presents the cooling performance of a water-to-refrigerant type ground heat source heat pump system (GSHP) installed in a school building in Korea. The evaluation of the cooling performance has been conducted under the actual operation of GSHP system in the summer of year 2007. Ten heat pump units with the capacity of 10 HP each were installed in the building. Also, a closed vertical typed-ground heat exchanger with 24 boreholes of 175 m in depth was constructed for the GSHP system. To analyze the cooling performance of the GSHP system, we monitored various operating conditions, including the outdoor temperature, the ground temperature, and the water temperature of inlet and outlet of the ground heat exchanger. Simultaneously, the cooling capacity and the input power were evaluated to determine the cooling performance of the GSHP system. The average cooling coefficient of performance (COP) and overall COP of the GSHP system were found to be {proportional_to}8.3 and {proportional_to}5.9 at 65% partial load condition, respectively. While the air source heat pump (ASHP) system, which has the same capacity with the GSHP system, was found to have the average COP of {proportional_to}3.9 and overall COP of {proportional_to}3.4, implying that the GSHP system is more efficient than the ASHP system due to its lower temperature of condenser. (author)

  11. Software of microcomputer ELEKTRONIKA-60 installed in the control system of the measuring projector PUOS-4

    International Nuclear Information System (INIS)

    Dikij, V.M.; Nekipelova, G.D.; Shakhbazyan, V.V.; Yurpalov, V.D.

    1990-01-01

    The tasks, structure and aspects of realization of servodrivers of the PUOS-4 measuring projector (measuring carriage, tape transport) on the installed ELEKTRONIKA-60 microcomputer operating in the multi-machine system of film information preprocessing, are considered. Realizability of drivers is estimated under rigid operation conditions using the RTM60 real time monitor. The problem of the projector testing is also considered. 11 refs.; 5 figs.; 1 tab

  12. Lessons learned from a whole hospital PACS installation. Picture Archiving and Communication System.

    Science.gov (United States)

    Pilling, J R

    2002-09-01

    The Norfolk and Norwich University Hospital has incorporated a fully filmless Picture Archiving and Communication System (PACS) as part of a new hospital provision using PFI funding. The PACS project has been very successful and has met with unanimous acclaim from radiologists and clinicians. A project of this size cannot be achieved without learning some lessons from mistakes and recognising areas where attention to detail resulted in a successful implementation. This paper considers the successes and problems encountered in a large PACS installation.

  13. A new gas stripper system for BARC-TIFR Pelletron Accelerator facility: installation and preliminary results

    International Nuclear Information System (INIS)

    Sharma, S.C.; Ninawe, N.G.; Yadav, M.L.; Ekambaram, M.; Ramjilal; Matkar, U.V.; Ansari, Q.N.; Lokare, R.N.; Ramlal; Gupta, A.K.; Bhagwat, P.V.; Pillay, R.G.

    2009-01-01

    The gas-stripper plays a key role in stripping the heavy and molecular ion beams in a tandem accelerator. Efficiency of gas stripper depends on its supporting vacuum pumps. A new recirculating turbo molecular pump-based gas stripper has been installed in the high voltage terminal of Pelletron Accelerator. Re-circulating the stripper gas reduces the flow of gas into the accelerating tubes reducing the transmission losses. Preliminary results obtained using the new gas stripper system are discussed. (author)

  14. FN-tandem accelerator in Bucharest after the seismic protection system installation

    International Nuclear Information System (INIS)

    Marinescu, L.; Petrascu, M.; Dima, R.; Serban, D.

    1996-01-01

    Subsequent to the installation of the seismic protection system in the HVEC FN-tandem accelerator in Bucharest, observations have been made of the efficiency of the protection devices. Performance and improvements of the new voltage divider are discussed. The SF 6 content of the insulating gas is shown to be conveniently measured using the elastic recoil technique and a robust ioniser heater is described for the HICONEX source. (orig.)

  15. Installation and Commissioning of the Helium Refrigeration System for the HANARO-CNS

    International Nuclear Information System (INIS)

    Choi, Jung Woon; Kim, Young Ki; Wu, Sang Ik; Son, Woo Jung

    2009-11-01

    The cold neutron source (CNS), which will be installed in the vertical CN hole of the reflector tank at HANARO, makes thermal neutrons to moderate into the cold neutrons with the ranges of 0.1 ∼ 10 meV passing through a moderator at about 22K. A moderator to produce cold neutrons is liquid hydrogen, which liquefies by the heat transfer with cryogenic helium flowing from the helium refrigeration system. For the maintenance of liquid hydrogen in the IPA, the CNS system is mainly consisted of the hydrogen system to supply the hydrogen to the IPA, the vacuum system to keep the cryogenic liquid hydrogen in the IPA, and the helium refrigeration system to liquefy the hydrogen gas. The helium refrigeration system can be divided into two sections: one is the helium compression part from the low pressure gas to the high pressure gas and the other is the helium expansion part from the high temperature gas and pressure to low temperature and pressure gas by the expansion turbine. The helium refrigeration system except the warm helium pipe and the helium buffer tank has been manufactured by Linde Kryotechnik, AG in Switzerland and installed in the research reactor hall, HANARO. Other components have been manufactured in the domestic company. This technical report deals with the issues, its solutions, and other particular points while the helium refrigeration system was installed at site, verified its performance, and conducted its commissioning along the reactor operation. Furthermore, the operation procedure of the helium refrigeration system is included in here for the normal operation of the CNS

  16. Design and installation of a laboratory-scale system for radioactive waste treatment

    International Nuclear Information System (INIS)

    Berger, D.N.; Knox, C.A.; Siemens, D.H.

    1980-05-01

    Described are the mechanical design features and remote installation of a laboratory-scale radiochemical immobilization system which is to provide a means at Pacific Northwest Laboratory of studying effluents generated during solidification of high-level liquid radioactive waste. Detailed are the hot cell, instrumentation, two 4-in. and 12-in. service racks, the immobilization system modules - waste feed, spray calciner unit, and effluent - and a gamma emission monitor system for viewing calcine powder buildup in the spray calciner/in-can melter

  17. Functioning strategy study on control systems of large physical installations used with a digital computer

    International Nuclear Information System (INIS)

    Bel'man, L.B.; Lavrikov, S.A.; Lenskij, O.D.

    1975-01-01

    A criterion to evaluate the efficiency of a control system functioning of large physical installations by means of a control computer. The criteria are the object utilization factor and computer load factor. Different strategies of control system functioning are described, and their comparative analysis is made. A choice of such important parameters as sampling time and parameter correction time is made. A single factor to evaluate the system functioning efficiency is introduced and its dependence on the sampling interval value is given. Using diagrams attached, it is easy to find the optimum value of the sampling interval and the corresponding maximum value of the single efficiency factor proposed

  18. Evaluation of a reverberation enhancement system installed in a small multi purpose hall

    DEFF Research Database (Denmark)

    Gade, Anders Christian

    1997-01-01

    After design and installation of a reverberation enhancement system in new 400 seat multi purpose hall in Vejle, Denmark. room acoustic measurements and listening tests were performed in order to reveal the objective and subjective performance and limits of such a powerful tool for altering ''room...... acoustic'' properties. The compromises in realistic choice of acoustic parameters for the different settings of the system are described with reference to the natural acoustics and functional needs of the hall in question. Although the enhancement system is capable of increasing the reverberation time...

  19. Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-16

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  20. [Review of wireless energy transmission system for total artificial heart].

    Science.gov (United States)

    Zhang, Chi; Yang, Ming

    2009-11-01

    This paper sums up the fundamental structure of wireless energy transmission system for total artificial heart, and compares the key parameters and performance of some representative systems. After that, it is discussed that the future development trend of wireless energy transmission system for total artificial heart.

  1. Designing, Constructing and Installing a Local Exhaust Ventilation System to Minimize Welders\\' Exposure to Welding Fumes

    Directory of Open Access Journals (Sweden)

    Sajad Zare

    2017-10-01

    Full Text Available Background & Aims of the Study: Welder’s exposure to welding fumes can cause occupational diseases. The current study sought to examine exposure to welding fumes among welders who work in the repair shop of Sarcheshmeh Copper Complex and design a local exhaust ventilation system to control exposure to welding fumes. Materials & Methods: This applied analytical study was conducted in the summer of 2016 among welders working in the repair shop of Sarcheshmeh Copper Complex. The study comprised three phases; in the first one, welders’ exposure to welding fumes was assessed at the beginning of the study. After that, a local exhaust ventilation system was designed and installed in the aforementioned repair shop. In the final stage, welders’ exposure to welding fumes was assessed again after installation of the ventilation system. The procedure recommended by NIOSH (method number 7300 was used for individual sampling of welders. Results: Based on the obtained findings, before installing the ventilation system, welding technicians were exposed to 0.3 mg/m3 of copper fumes and 0.04 mg/m3 of chromium fumes. Journeyman welders were also exposed to 2.16 mg/m3 of manganese fumes, while stellar welders were exposed to 6.9 mg/m3 of iron fumes. In the light of these measurements, a local exhaust ventilation system was designed and installed. Subsequently, measurement of exposure to welding fumes showed a significant reduction. That is, welding technicians were exposed to 0.17 mg/m3 and 0.015 mg/m3 of copper and chromium fumes respectively. Additionally, journeyman welders were exposed to 0.86 mg/m3 of manganese fumes, whereas stellar welders were exposed to 4.3 mg/m3 of iron fumes. Conclusions: A comparison of standard limits of exposure to welding fumes and the results obtained from measurements in sampling stations before and after the installation of the local exhaust ventilation system reveals that this controlling measure was very effective in the

  2. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  3. The underwater installation of a drained geomembrane system on Lost Creek Dam

    International Nuclear Information System (INIS)

    Onken, S.; Harlan, R.C.; Wilkes, J.; Vaschetti, G.

    1998-01-01

    Lost Creek Dam was constructed in California around 1923. It is a 122 foot high concrete arch dam with a crest elevation of 3,287 feet and a crest length of 490 feet. Over the years, the dam and the condition of the concrete face have deteriorated. The concrete is porous and seeps water along the entire downstream face. In winter, the seeping water freezes, penetrates the concrete and causes expansion and spalling of the concrete surface. In some places, the concrete has very low strength to a depth of a foot or more, rendering the dam only marginally safe. Seven mitigative measures were identified as possible solutions to the problem. It was determined that the seepage of the water through the concrete dam could be stopped with the installation of a geomembrane to the upstream face. This paper describes the unique underwater installation of a drained geomembrane system on the concrete face of the dam. This was the first ever installation of a drained geomembrane system on an entire dam using divers. Monitoring will determine the success of the project, and whether the seepage of the water through the porous concrete had been reduced sufficiently to stop the deterioration of the concrete on the downstream face. 2 refs., 12 figs

  4. Experimental coal dust suppression system installed at the Nikola Tesla thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Guzijan, D [Rudarski Institut, Belgrade (Yugoslavia). Zavod za Ventilaciju i Tehnicku Zastitu

    1988-01-01

    Describes a project conducted at the Nikola Tesla thermal power plant by the Mining Institute of Belgrade to reduce the high levels of dust concentrations in overloading stations on coal conveyors and hoppers. A mathematical model was developed to determine the ventilation capacity required at each of the 18 overloading stations with the hoppers considered successively: empty, 1/3 full, 2/3 full and completely full. Shows how this model enabled an efficient dust suppression system to be developed and subsequently installed by the Termovent company in Belgrade using 4 axial ventilators supplied by the Ventilator Company in Zagreb. The ventilators were powered by means of 5.5 kW electric motors and provided 440 Pa pressure at 950 rpm. Gives the result of dust concentration measurements indicating that the installed system achieved the results predicted by the mathematical model and that the levels were well below the statutory limit. A description of the complete installation is included. 3 refs.

  5. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  6. Hot stuff : ultra-high temperature ESP system installed in SAGD wells

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2010-10-15

    Ultra-temperature electrical submersible pumping (ESP) systems have been installed in steam-assisted gravity drainage (SAGD) wells for the first time at a thermal project in Christina Lake, Alberta. The Centrilift XP ESP production system that is being field tested can operate at fluid temperatures reaching 250 degrees C, higher than conventional systems, which is expected to result in an increase in production with a larger steam chamber and less viscous oil at higher steaming temperatures. The more robust system is expected to extend run life and lower operating costs. Years of research and development at specialized testing facilities went into creating the system. The unique testing facilities simulated the horizontal orientation and temperature cycling characteristics of SAGD wells and permitted the system to be tested at temperatures up to 300 degrees C. The new system is expected to lower infrastructure costs for SAGD wells that require high temperatures. 1 fig.

  7. Data Analysis of the TK-1G Sounding Rocket Installed with a Satellite Navigation System

    Directory of Open Access Journals (Sweden)

    Lesong Zhou

    2017-10-01

    Full Text Available This article gives an in-depth analysis of the experimental data of the TK-1G sounding rocket installed with the satellite navigation system. It turns out that the data acquisition rate of the rocket sonde is high, making the collection of complete trajectory and meteorological data possible. By comparing the rocket sonde measurements with those obtained by virtue of other methods, we find that the rocket sonde can be relatively precise in measuring atmospheric parameters within the scope of 20–60 km above the ground. This establishes the fact that the TK-1G sounding rocket system is effective in detecting near-space atmospheric environment.

  8. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  9. An Open-source Meteorological Operational System and its Installation in Portuguese- speaking Countries

    Science.gov (United States)

    Almeida, W. G.; Ferreira, A. L.; Mendes, M. V.; Ribeiro, A.; Yoksas, T.

    2007-05-01

    CPTEC, a division of Brazil’s INPE, has been using several open-source software packages for a variety of tasks in its Data Division. Among these tools are ones traditionally used in research and educational communities such as GrADs (Grid Analysis and Display System from the Center for Ocean-Land-Atmosphere Studies (COLA)), the Local Data Manager (LDM) and GEMPAK (from Unidata), andl operational tools such the Automatic File Distributor (AFD) that are popular among National Meteorological Services. In addition, some tools developed locally at CPTEC are also being made available as open-source packages. One package is being used to manage the data from Automatic Weather Stations that INPE operates. This system uses only open- source tools such as MySQL database, PERL scripts and Java programs for web access, and Unidata’s Internet Data Distribution (IDD) system and AFD for data delivery. All of these packages are get bundled into a low-cost and easy to install and package called the Meteorological Data Operational System. Recently, in a cooperation with the SICLIMAD project, this system has been modified for use by Portuguese- speaking countries in Africa to manage data from many Automatic Weather Stations that are being installed in these countries under SICLIMAD sponsorship. In this presentation we describe the tools included-in and and architecture-of the Meteorological Data Operational System.

  10. Total Quality Management and the System Safety Secretary

    Science.gov (United States)

    Elliott, Suzan E.

    1993-01-01

    The system safety secretary is a valuable member of the system safety team. As downsizing occurs to meet economic constraints, the Total Quality Management (TQM) approach is frequently adopted as a formula for success and, in some cases, for survival.

  11. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    Science.gov (United States)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  12. Solar heating and hot water system installed at Arlington Raquetball Club, Arlington, Virginia

    Science.gov (United States)

    1981-01-01

    A solar space and water heating system is described. The solar energy system consists of 2,520 sq. ft. of flat plate solar collectors and a 4,000 gallon solar storage tank. The transfer medium in the forced closed loop is a nontoxic antifreeze solution (50 percent water, 50 percent propylene glycol). The service hot water system consists of a preheat coil (60 ft. of 1 1/4 in copper tubing) located in the upper third of the solar storage tank and a recirculation loop between the preheat coil and the existing electric water heaters. The space heating system consists of two separate water to air heat exchangers located in the ducts of the existing space heating/cooling systems. The heating water is supplied from the solar storage tank. Extracts from site files, specification references for solar modifications to existing building heating and hot water systems, and installation, operation and maintenance instructions are included.

  13. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  14. Management of manufacture and installation of plant pipings by bar code system

    International Nuclear Information System (INIS)

    Suwa, Minoru

    1995-01-01

    As for the piping system of nuclear power plants, the number of parts is very large, and the mill sheet is attached to each part, therefore, it is necessary to manage them individually, and large man power is required. In order to resolve the delay of mechanization in the factory, bar code system was adopted on full scale. At the time of taking parts out from the store, bar code labels are stuck to all piping parts. By this means, all the processes of manufacture and inspection are managed with a computer, and it is useful for labor saving and the prevention of mistaken input. This system is centering around the system of the progress management for piping manufacture, and is operated by being coupled with respective systems of production design, order and inventory, mill sheet management and installation management. The management of production design, manufacture, inspection and installation is explained. There is the problem of sticking bar code labels again as the labels become dirty or parts pass through coating and pickling processes. The direct carving of bar codes on parts by laser marker was tried, and it was successful for stainless steel, but in carbon steel pipes, it was hard to read. It is desirable to develop the bar codes which endure until the end of plant life. (K.I.)

  15. What is stopping you from installing solar systems? Contrasting Chilean with German homes.

    Science.gov (United States)

    Haas, J.; Caro Castro, C. P.

    2017-12-01

    Towards meeting Paris` climate change goals, a rapid shift towards clean energy sources is needed. While the deployment of centralized solar photovoltaic (PV) power plants has been remarkable in Germany and -in the last years- also in Chile, the residential PV installations in Chile lag greatly in contrast to Germany. In fact, Chile's largest PV system until 2012 was smaller than 25 kW. And, although the recently implemented net-billing scheme has brightened this scenario, most of Chile's roofs keep being bald. Beyond the evident economic contrasts among both countries, there are many other underlying differences in public acceptance of renewable technologies. Understanding them is of both conceptual and practical importance. Here, we study the variables that determine the public acceptance of residential PV systems in Germany and Chile. We survey the positions of laypersons on the support of climate change goals, on the necessity of renewable technologies, on their auto-sustainability (how much I identify myself with being sustainable), and on their auto-effectiveness (do I believe that my behavior has impact on global targets). The sample is further characterized by socioeconomic status, knowledge and experience and proximity to solar systems, esthetic perception of the systems, security of the neighborhood and house ownership, willingness of installing solar systems, and trust in the technology. We identify the main factors via data correlation analysis. From our findings, actions to improve the acceptance and literacy of solar technologies in Chile can be derived.

  16. Global search tool for the Advanced Photon Source Integrated Relational Model of Installed Systems (IRMIS) database

    International Nuclear Information System (INIS)

    Quock, D.E.R.; Cianciarulo, M.B.

    2007-01-01

    The Integrated Relational Model of Installed Systems (IRMIS) is a relational database tool that has been implemented at the Advanced Photon Source to maintain an updated account of approximately 600 control system software applications, 400,000 process variables, and 30,000 control system hardware components. To effectively display this large amount of control system information to operators and engineers, IRMIS was initially built with nine Web-based viewers: Applications Organizing Index, IOC, PLC, Component Type, Installed Components, Network, Controls Spares, Process Variables, and Cables. However, since each viewer is designed to provide details from only one major category of the control system, the necessity for a one-stop global search tool for the entire database became apparent. The user requirements for extremely fast database search time and ease of navigation through search results led to the choice of Asynchronous JavaScript and XML (AJAX) technology in the implementation of the IRMIS global search tool. Unique features of the global search tool include a two-tier level of displayed search results, and a database data integrity validation and reporting mechanism.

  17. Land suitability for final waste disposal with emphasis on septic systems installation in southern Minas Gerais, Brazil

    Directory of Open Access Journals (Sweden)

    Jeani Moreira de Oliveira

    2016-02-01

    Full Text Available ABSTRACT Environmental pollution is a problem that has been noted due to changes in the environment, affecting natural resources. Regarding the soil, it may offer great potential for waste disposal. Thus, this study aims to propose criteria for evaluating local suitability for waste disposal, according to soil and terrain attributes for southern Minas Gerais State, and to apply those criteria to define the most appropriate locations for installation of septic systems in a pilot watershed. Literature and the authors' experience were used to propose the more important criteria regarding the suitability of sites for waste disposal. The set of attributes taken into account was grouped into four suitability classes: Adequate, Regular, Restricted and Inadequate. The defined criteria and considered limiting were: soil depth, texture, textural gradient, structure, natural drainage, water infiltration, type of surface horizon, water table depth, depth of perched water table, distance from water bodies, relief, stoniness, rockiness and risk of flooding. From these, soil depth, natural drainage, water table depth, relief and distance from water bodies were adopted for the installation of septic systems. From the total area of the watershed, 5.29% fit in the Adequate suitability class. The Regular, Restricted, and Inadequate sites accounted for, respectively, 19.72%, 41.99% and 33% of the wathershed. Factors such as soil and terrain attributes provide a basis for defining more appropriate places for waste disposal. Future work should involve the refinement of these propositions, since there are rare studies in this research line in Brazil.

  18. Proposal for the award of a blanket contract for the supply, installation and maintenance of the LHC access control system

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply, installation and maintenance of the LHC access control system. Following a market survey carried out among 134 firms in fifteen Member States, a call for tenders (IT-3026/TS/LHC) was sent on 22 January 2004 to eight firms and eight consortia in six Member States. By the closing date, CERN had received nine tenders from two firms and seven consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium CEGELEC CENTRE EST (FR) - CEGELEC (NL), the lowest technically compliant bidder, for the supply, installation and maintenance of the LHC access control system for a total amount not exceeding 4 600 000 euros (7 141 000 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - ...

  19. Solar hot water system installed at Quality Inn, Key West, Florida

    Science.gov (United States)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  20. Installation guidelines for Solar Heating System, single-family residence at New Castle, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Solar Heating System installer guidelines are provided for each subsystem and includes testing and filling the system. This single-family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Information is also provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance. Information consists of written procedures, schematics, detail drawings, pictures and manufacturer's component data.

  1. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    International Nuclear Information System (INIS)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-01

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component

  2. Remote inspection system for components installed inside a primary containment vessel of a boiling water reactor

    International Nuclear Information System (INIS)

    Shimizu, Katsutoshi; Kawai, Katsumi; Ito, Takahiko; Hashimoto, Yuji; Tomizawa, Fumio.

    1983-01-01

    A remote operation type monitoring system was developed to always enable the watching of the condition of the main equipment installed in the containment vessels of BWRs. It comprises four inspection vehicles suspended by a monorail and pulled with trolley chain, coaxial cables for signal transmission and power supply, and control system. On the inspection vehicles, a television camera, a thermometer, a microphone and a radiation dose rate meter are installed. The performance of the system was confirmed at 60 deg C for several months. Thereafter, the field test was carried out in the Tokai No. 2 Power Station, Japan Atomic Power Co., from December, 1980, to September, 1981. By the continuous monitoring and grasp of operational condition, the preventive maintenance and the improvement of the rate of operation can be expected. Also it is desirable in view of the reduction of radiation exposure of operators. The mechanization of and the labor saving in inspection and maintenance works is necessary because skilled workers will be short. The design and the composition of the system and its tests are reported. (Kako, I.)

  3. Installation of the multi-packer system for the long-term monitoring of deep groundwater system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyung Su; Bae, Dae Seok; Kim, Chun Soo; Park, Byung Yoon; Koh, Yong Kweon; Kim, Geon Young [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    The groundwater system in the deep geological environment is very important to evaluate the behavior of the radionuclide migration and near-field barrier system. The multi-packer system was installed to derive the long-term change of the groundwater pressure and its quality in the several isolated monitoring zones with depth in the study sites. The monitoring zones were basically determined by the spatial distribution characteristics of the conductive fracture and their hydraulic properties. To recover the natural groundwater condition, the borehole water was purged after completing the installation. From this equipment, the in-situ data will be provided to the radionuclide migration and system development study. 2 refs., 9 figs., 3 tabs. (Author)

  4. Environmental Monitoring Techniques and Equipment related to the installation and operation of Marine Energy Conversion Systems

    International Nuclear Information System (INIS)

    Scanu, Sergio; Carli, Filippo Maria; Piermattei, Viviana; Bonamano, Simone; Paladini de Mendoza, Francesco; Marcelli, Marco; Peviani, Maximo Aurelio; Dampney, Keith; Norris, Jennifer

    2015-01-01

    Results of activities under project Marine Renewables Infrastructure Network for Emerging Energy Technologies (MaRINET) are reported, which led to DEMTE, a database, created on the basis of standardized monitoring of the marine environment during installation, operation and decommissioning of Marine Energy Conversion Systems. Obtained with the consortium partners’ available techniques and equipment, the database shows that such instruments cover all identified marine environmental compartments, despite the lack of underwater vehicles and the reduced skills in using satellite technologies. These weaknesses could be overcome by an accurate planning of equipment, techniques and knowledge sharing. The approach here presented also leads to an effective analysis even in non-marine contexts

  5. Guidelines for safety related telecommunications systems on normally attended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally attended offshore installations associated with oil and gas production on the United Kingdom continental shelf. Basic requirements for such equipment are presented as a series of objectives which should be capable of being met in the event of any emergency situation arising. The telecommunications facilities necessary to meet these objectives are identified, together with the role of each facility in controlling the emergency, how each would be used and the design considerations to ensure the facilities will remain operational throughout the emergency. (UK)

  6. Development and installation of solution measurement and monitoring system (SMMS) at TRP

    International Nuclear Information System (INIS)

    Satoh, Takehiko; Yamanaka, Atsushi; Kashimura, Takao; Yamamoto, Tokuhiro

    2001-01-01

    The IAEA proposed TRP safeguard improvement plants in 1995 for closer and more efficient safeguards of TRP. Development of Solution Measurement and Monitoring System (SMMS) is one item of the plans and has been carried out under the JASPAS program as JA-6. Following to the IAEA's acceptance test, after the installation of the SMMS in 1999, field test of this system has been carried out. The main purpose of the SMMS is to establish the IAEA's independent monitoring system. Besides input and output accountability tanks, seven Pu storage tanks and a pot attached to the Pu storage tanks are monitored continuously, and solution level, density and temperature data of these tanks are recorded by the SMMS. Authentication of the SMMS, confirmed by the IAEA at the acceptance test, is kept by failure detection and recording functions of the system. (author)

  7. Solar heating and hot water system installed at Municipal Building complex, Abbeville, South Carolina

    Science.gov (United States)

    1979-01-01

    Information on the solar energy system installed at the new municipal building for the City of Abbeville, SC is presented, including a description of solar energy system and buildings, lessons learned, and recommendations. The solar space heating system is a direct air heating system. The flat roof collector panel was sized to provide 75% of the heating requirement based on an average day in January. The collectors used are job-built with two layers of filon corrugated fiberglass FRP panels cross lapped make up the cover. The storage consists of a pit filled with washed 3/4 in - 1 1/2 in diameter crushed granite stone. The air handler includes the air handling mechanism, motorized dampers, air circulating blower, sensors, control relays and mode control unit. Solar heating of water is provided only those times when the hot air in the collector is exhausted to the outside.

  8. Optical analysis of a photovoltaic V-trough system installed in western India.

    Science.gov (United States)

    Maiti, Subarna; Sarmah, Nabin; Bapat, Pratap; Mallick, Tapas K

    2012-12-20

    The low concentrating photovoltaic (PV) system such as a 2× V-trough system can be a promising choice for enhancing the power output from conventional PV panels with the inclusion of thermal management. This system is more attractive when the reflectors are retrofitted to the stationary PV panels installed in a high aspect ratio in the north-south direction and are tracked 12 times a year manually according to preset angles, thus eliminating the need of diurnal expensive tracking. In the present analysis, a V-trough system facing exactly the south direction is considered, where the tilt angle of the PV panels' row is kept constant at 18.34°. The system is installed on the terrace of CSIR-Central Salt and Marine Chemicals Research Institute in Bhavnagar, Gujarat, India (21.47 N, 71.15 E). The dimension of the entire PV system is 9.64 m×0.55 m. The V-troughs made of anodized aluminum reflectors (70% specular reflectivity) had the same dimensions. An in-house developed; experimentally validated Monte Carlo ray-trace model was used to study the effect of the angular variation of the reflectors throughout a year for the present assembly. Results of the ray trace for the optimized angles showed the maximum simulated optical efficiency to be 85.9%. The spatial distribution of solar intensity over the 0.55 m dimension of the PV panel due to the V-trough reflectors was also studied for the optimized days in periods that included solstices and equinoxes. The measured solar intensity profiles with and without the V-trough system were used to calculate the actual optical efficiencies for several sunny days in the year, and results were validated with the simulated efficiencies within an average error limit of 10%.

  9. Field installation versus local integration of photovoltaic systems and their effect on energy evaluation metrics

    International Nuclear Information System (INIS)

    Halasah, Suleiman A.; Pearlmutter, David; Feuermann, Daniel

    2013-01-01

    In this study we employ Life-Cycle Assessment to evaluate the energy-related impacts of photovoltaic systems at different scales of integration, in an arid region with especially high solar irradiation. Based on the electrical output and embodied energy of a selection of fixed and tracking systems and including concentrator photovoltaic (CPV) and varying cell technology, we calculate a number of energy evaluation metrics, including the energy payback time (EPBT), energy return factor (ERF), and life-cycle CO 2 emissions offset per unit aperture and land area. Studying these metrics in the context of a regionally limited setting, it was found that utilizing existing infrastructure such as existing building roofs and shade structures does significantly reduce the embodied energy requirements (by 20–40%) and in turn the EPBT of flat-plate PV systems due to the avoidance of energy-intensive balance of systems (BOS) components like foundations. Still, high-efficiency CPV field installations were found to yield the shortest EPBT, the highest ERF and the largest life-cycle CO 2 offsets—under the condition that land availability is not a limitation. A greater life-cycle energy return and carbon offset per unit land area is yielded by locally-integrated non-concentrating systems, despite their lower efficiency per unit module area. - Highlights: ► We evaluate life-cycle energy impacts of PV systems at different scales. ► We calculate the energy payback time, return factor and CO 2 emissions offset. ► Utilizing existing structures significantly improves metrics of flat-plate PV. ► High-efficiency CPV installations yield best return and offset per aperture area. ► Locally-integrated flat-plate systems yield best return and offset per land area.

  10. Solar heating and hot water system installed at Saint Louis, Missouri

    Science.gov (United States)

    1980-01-01

    The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  11. Cooling systems for efficient operation of induction heating installations; Kuehlsysteme fuer den effizienten Betrieb von Induktionsschmelzanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Doetsch, Erwin; Schmidt, Juergen [ABP Induction Systems GmbH, Dortmund (Germany)

    2009-12-15

    Electrical and thermal losses in the system components of induction melting systems are mainly carried off by the cooling water. The design and maintenance of the corresponding cooling systems play a decisive role in the operating reliability of induction installations. Due to the differing requirements made on water quality, cooling of the furnace and the electrical components is generally accomplished by means of two independent cooling circuits, which are described below. The article also examines utilization of waste-heat, which has a particular significance for energy-efficiency, since more than a fourth of the furnace power, in the case of melting of ferrous materials, and more than half, in the case of non-ferrous materials, is lost. (orig.)

  12. Application of Total Quality Management System in Thai Primary Schools

    Science.gov (United States)

    Prueangphitchayathon, Setthiya; Tesaputa, Kowat; Somprach, Kanokorn

    2015-01-01

    The present study seeks to develop a total quality management (TQM) system that can be applied to primary schools. The approach focuses on customer orientation, total involvement of all constituencies and continuous improvement. TQM principles were studied and synthesized according to case studies of the best practices in 3 primary schools (small,…

  13. The design and installation of Solar Home Systems in rural Cambodia

    Directory of Open Access Journals (Sweden)

    Rebecca Alice Watts

    2016-09-01

    Full Text Available This study contends that solar home systems (SHS are an appropriate solution to provide affordable, reliable and clean electricity in rural Cambodia. SHS provide decentralised electricity suitable for the electricity needs of rural households and with the decreasing cost of solar energy technologies, SHS are becoming an increasingly competitive source of energy. This study details the design and installation of two SHS in a rural community in Cambodia. The SHS have replaced the use of kerosene lamps and supplemented car battery usage, which has generated a cost saving of USD$2.50-3.20 per month. The SHS have increased the hours of quality lighting making it possible for users to improve educational outcomes by studying at night and participating in private education classes as well as potentially extending their working hours that provides an opportunity to increase their income. Community involvement in the installation of SHS and participation in an education program has ensured transfer of knowledge about system operation and maintenance at a local level that has ensured economic, social and environmental were benefits. This study builds a case in support of solar energy at the household level in rural Cambodia and makes recommendations for the deployment of SHS in rural communities throughout the developing world.

  14. Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors

    Science.gov (United States)

    Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.

    2015-01-01

    This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.

  15. Awareness of the Installation the Lightning Protection System (LPS by Using Structural Bonding Method in Malaysia

    Directory of Open Access Journals (Sweden)

    Abdul Rahim Mustaqqim

    2017-01-01

    Full Text Available Structural Bonding Method (SBM is one type of Lightning Protection System (LPS, design to protect human, structures, contents inside structures, electrical equipment, transmission lines and other from the lightning flash. Besides, SBM is a standard LPS that comply with technical standards or codes of practice or called as conventional Lightning Protection System. In order to know the level of the Awareness of the Installation LPS by using SBM in the building among Civil Engineering Consultants, conducting survey need to be done. This paper presents the Research Design and Research Strategy in conducting the survey. It is explaining about the way before conducting the survey which are determine the population of sample (Consultant Company at Northern Region Area, samples of respondents (Civil Engineer at Consultant Office with the number of sample is 40, data collecting process, structure of the questionnaire form and the way in analysis the data. After the analysis the data, the result of the level of awareness in the Installation of LPS by using SBM are consider as moderate level.

  16. Installation of the CDC 7600 supercomputer system in the computer centre in 1972

    CERN Multimedia

    Nettz, William

    1972-01-01

    The CDC 7600 was installed in 1972 in the newly built computer centre. It was said to be the largest and most powerful computer system in Europe at that time and remained the fastest machine at CERN for 9 years. It was replaced after 12 years. Dr. Julian Blake (CERN), Dr. Tor Bloch (CERN), Erwin Gasser (Control Data Corporation), Jean-Marie LaPorte (Control Data Corporation), Peter McWilliam (Control Data Corporation), Hans Oeshlein (Control Data Corporation), and Peter Warn (Control Data Corporation) were heavily involved in this project and may appear on the pictures. William Nettz (who took the pictures) was in charge of the installation. Excerpt from CERN annual report 1972: 'Data handling and evaluation is becoming an increasingly important part of physics experiments. In order to meet these requirements a new central computer system, CDC 7600/6400, has been acquired and it was brought into more or less regular service during the year. Some initial hardware problems have disappeared but work has still to...

  17. Methods of multicriterion estimations in system total quality management

    Directory of Open Access Journals (Sweden)

    Nikolay V. Diligenskiy

    2011-05-01

    Full Text Available In this article the method of multicriterion comparative estimation of efficiency (Data Envelopment Analysis and possibility of its application in system of total quality management is considered.

  18. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  19. Systems-based modeling of generation variability under alternate geographic configurations of photovoltaic (PV) installations in Virginia

    International Nuclear Information System (INIS)

    Collins, Ross D.; Crowther, Kenneth G.

    2011-01-01

    With increased focus on renewable energy in our modern era, it is increasingly important to understand the impact of policies on the performance and reliability of regional energy systems. This research develops a model to understand how geographic dispersion of PV installations impacts the reliability of electricity generated from the total PV network, measured by the variance of the distribution of generated electricity. Using NREL data, beta probability distributions of sunlight (kWh/m 2 /day) in various regions of Virginia are estimated using a fitting method that minimizes the Kolmogorov-Smirnov test statistic. A Monte Carlo simulation model is developed to measure PV electricity generation from multiple centralized and dispersed configurations over 100,000 days of probabilistic sunlight. There is a calculable tradeoff between average generation and generation variability, and increased geographic dispersion of PV installations can decrease this variability. Controlling variable generation through policies that promote efficient PV siting can help provide reliable power, minimizing the need for load-balancing peaking power infrastructure and costly electricity purchases from the grid. Using a tradeoff framework of generation and costs, this paper shows that geographically dispersed generation can mitigate the risk of unreliable solar generation that can significantly impact the end-user costs and make PV infrastructure unattractive. - Highlights: → We model how uncertain sunlight affects generation of different PV systems. → We show that geographically dispersed systems decrease generation variability. → Geographically dispersed PV systems are potentially more costly in the short run. → Controlling variability provides reliable power, which can decrease long-run costs. → Promoting mixes of uncertain energy sources requires assessment of these tradeoffs.

  20. Mortality After Total Knee and Total Hip Arthroplasty in a Large Integrated Health Care System.

    Science.gov (United States)

    Inacio, Maria C S; Dillon, Mark T; Miric, Alex; Navarro, Ronald A; Paxton, Elizabeth W

    2017-01-01

    The number of excess deaths associated with elective total joint arthroplasty in the US is not well understood. To evaluate one-year postoperative mortality among patients with elective primary and revision arthroplasty procedures of the hip and knee. A retrospective analysis was conducted of hip and knee arthroplasties performed in 2010. Procedure type, procedure volume, patient age and sex, and mortality were obtained from an institutional total joint replacement registry. An integrated health care system population was the sampling frame for the study subjects and was the reference group for the study. Standardized 1-year mortality ratios (SMRs) and 95% confidence intervals (CIs) were calculated. A total of 10,163 primary total knee arthroplasties (TKAs), 4963 primary total hip arthroplasties (THAs), 606 revision TKAs, and 496 revision THAs were evaluated. Patients undergoing primary THA (SMR = 0.6, 95% CI = 0.4-0.7) and TKA (SMR = 0.4, 95% CI = 0.3-0.5) had lower odds of mortality than expected. Patients with revision TKA had higher-than-expected mortality odds (SMR = 1.8, 95% CI = 1.1-2.5), whereas patients with revision THA (SMR = 0.9, 95% CI = 0.4-1.5) did not have higher-than-expected odds of mortality. Understanding excess mortality after joint surgery allows clinicians to evaluate current practices and to determine whether certain groups are at higher-than-expected mortality risk after surgery.

  1. Total Data Management System for the La Hague spent fuel reprocessing plants

    International Nuclear Information System (INIS)

    Chabert, J.; Coignaud, G.; Perot, J.P.; Fournier, W.; Silvain, B.

    1991-01-01

    Operation of the UP2 and UP3 reprocessing plants at La Hague, France, generates considerable data processing requirements. To meet these requirements, a Total Data Management System (TDMS) has been designed and installed to operate the biggest Ethernet industrial network in Europe. This network, called Haguenet, interconnects a large number of computers and user terminals. The TDMS' main operational functions are plant operation and production data management, maintenance data management, technical documents management and computer-aided design (CAD). Extensive experience was gained through the design and operation of the TDMS at La Hague. (author)

  2. Development of total medical material distribution management system.

    Science.gov (United States)

    Uto, Y; Kumamoto, I

    1994-07-01

    Since September 1992, attempts have been made at Kagoshima University Hospital to develop the Medical Material Distribution Management System which helps to realize optimal hospital management as a subsystem of the Total Hospital Information System of Kagoshima University (THINK). As this system has been established, it has become possible for us to have an accurate grasp of the flow and stock of medical materials at our hospital. Furthermore, since September 1993, the Medical Material Distribution Management System has been improved and the Total Medical Material Distribution Management System has been smoothly introduced into the site of clinical practice. This system enables automatic demands for fees for treatment with specific instruments and materials covered by health insurance. It was difficult to predict the effect of this system, because no similar system had been developed in Japan. However, more satisfactory results than expected have been obtained since its introduction.

  3. Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This document is the Final Report of the Solar Energy System Installed at the First Solar Heated Office Building, One Solar Place, Dallas, Texas. The Solar System was designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 Solargenics, series 76, flat plate collectors with a total area of 1596 square feet. The solar loop circulates an ethylene glycol-water solution through the collectors into a hot water system heat exchanger. The hot water storage subsystem consists of a heat exchanger, two 2300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water fixtures. The building cold water system provides make-up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described. The system became operational July 11, 1979.

  4. An integrated management system to improve the performance of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Beckmerhagen, I.A.; Berg, H.P. [Bundesamt fur Strahlenschutz, Salzgitter (Germany)

    2001-07-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  5. An integrated management system to improve the performance of nuclear installations

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2001-01-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  6. Procedure for Installing a photovoltaic system on roofs in Cuban Ron Corporation S.A

    International Nuclear Information System (INIS)

    Guzmán Villavicencio, Mayra; Águila Bernal, Inoel; Torres Águila, José M.; Soto Castellón, Carlos R.

    2017-01-01

    In this work, a methodological procedure developed from experiences gained during the project "Photovoltaic installation on the roofs of the Central Rum Factory for operation in self consumption and public MT grid connection” is presented, which was held along with UGAO-AINAIR signature. It is developed taking into account the need to further consolidate the dominance of this alternative energy technology, which is the first experience in such facilities for both, the rum industry and process industries in Cuba. There are no technical rules that regulate requirements to be considered during the conceptual stage of projects for the introduction of photovoltaic systems connected to the grid. The methodological procedure presented provides guidance for its application in other entities, resulting necessary its elaboration to ensure technical stability and reliability of systems during its life. (author)

  7. Design, Construction, Installation and First Commissioning Results of the LHC Cryogenic System

    CERN Document Server

    Claudet, S

    2006-01-01

    The cryogenic system of the Large Hadron Collider (LHC) will be, upon its completion in 2006, the largest in the world in terms of refrigeration capacity with an equivalent to 144 kW at 4.5 K, about 400'000 litres of superfluid helium with 25 km of superconducting magnets below 2 K leading to a cryogen inventory of 100 tons of helium. The challenges involved in the design, construction and installation, as well as the first commissioning results will be addressed in this talk. Particular mention will be made of the problems encountered and how they were or are being solved. Perspectives for LHC will be presented. General considerations for future large cryogenic systems will be briefly proposed.

  8. Remote system for monitoring and control of controlled area of nuclear installation

    International Nuclear Information System (INIS)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto; Farias, Marcos Sant'anna de; Santos, Isaac J.A. Luquetti dos

    2011-01-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  9. Remote system for monitoring and control of controlled area of nuclear installation

    Energy Technology Data Exchange (ETDEWEB)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto [Departamento de Ciencias da Administracao e Tecnologia. Centro Universitario de Araraquara (UNIARA) Araraquara, SP (Brazil); Farias, Marcos Sant' anna de; Santos, Isaac J.A. Luquetti dos, E-mail: luquetti@ien.gov.br [Instituto Engenharia Nuclear (IEN/CNEN-RJ), Rio Janeiro, RJ (Brazil). Divisao de Instrumentacao e Confiabilidade Humana

    2011-07-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  10. Qualitative analysis of the man-organization system in accident conditions for nuclear installations

    International Nuclear Information System (INIS)

    Farcasiu, Mita; Prisecaru, Ilie

    2010-01-01

    In this paper a model of the human performance investigation of accident conditions in the operation of the nuclear installation is developed. A framework for analyses of the human action in the man-organization system context is achieved. The goal of this model is to identify the possible roots causing human errors which could occur during the evolution of the accident by the qualitative analysis of the interfaces in man-organization system. These interfaces represent the main elements which characterize the implication of the organization in human performance. The results of this paper are the interfaces of the man-organization and their circumstances in which human performance could fail. Also, another result is a pre-designed framework which could help in the investigation of an accident. (authors)

  11. Preliminary measurements on the new TOF system installed at the AMS beamline of INFN-LABEC

    Energy Technology Data Exchange (ETDEWEB)

    Palla, L., E-mail: palla@fi.infn.it [Dipartimento di Fisica, Università di Pisa, e INFN Sezione di Pisa (Italy); Castelli, L. [INFN Sezione di Firenze (Italy); Czelusniak, C. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Fedi, M.E. [INFN Sezione di Firenze (Italy); Giuntini, L. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Liccioli, L. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Mandò, P.A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Martini, M. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Mazzinghi, A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Ruberto, C. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Schiavulli, L. [Dipartimento di Fisica, Università di Bari, e INFN Sezione di Bari (Italy); Sibilia, E. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Taccetti, F. [INFN Sezione di Firenze (Italy)

    2015-10-15

    A high resolution time of flight (TOF) system has been developed at LABEC, the 3 MV Tandem accelerator laboratory in Florence, in order to improve the sensitivity of AMS measurements on carbon samples with ultra-low concentration and also to measure other isotopes, such as {sup 129}I. The system can be employed to detect and identify residual interfering particles originated from the break-up of molecular isobars. The set-up has been specifically designed for low energy heavy ions: it consists of two identical time pick-off stations, each made up of a thin conductive foil and a Micro-Channel Plate (MCP) multiplier. The beamline is also equipped with a silicon detector, installed downstream the stop TOF station. In this paper the design of the new system and the implemented readout electronics are presented. The tests performed on the single time pick-off station are reported: they show that the maximum contribution to the timing resolution given by both the intrinsic MCP resolution and the electronics is ⩽500 ps (FWHM). For these tests, single particle pulsed beams of 2–5 MeV protons and 10 MeV {sup 12}C{sup 3+} ions, to simulate typical AMS conditions, were used. The preliminary TOF and TOF-E (TOF-energy) measurements performed with carbon beams after the installation of the new system on the AMS beam line are also discussed. These measurements were performed using the foil–MCP as the start stage and a silicon detector as the stop stage. The spectra acquired with carbon ions suggest the presence of a small residual background from neighboring masses reaching the end of the beamline with the same energy as the rare isotope.

  12. Preliminary measurements on the new TOF system installed at the AMS beamline of INFN-LABEC

    International Nuclear Information System (INIS)

    Palla, L.; Castelli, L.; Czelusniak, C.; Fedi, M.E.; Giuntini, L.; Liccioli, L.; Mandò, P.A.; Martini, M.; Mazzinghi, A.; Ruberto, C.; Schiavulli, L.; Sibilia, E.; Taccetti, F.

    2015-01-01

    A high resolution time of flight (TOF) system has been developed at LABEC, the 3 MV Tandem accelerator laboratory in Florence, in order to improve the sensitivity of AMS measurements on carbon samples with ultra-low concentration and also to measure other isotopes, such as "1"2"9I. The system can be employed to detect and identify residual interfering particles originated from the break-up of molecular isobars. The set-up has been specifically designed for low energy heavy ions: it consists of two identical time pick-off stations, each made up of a thin conductive foil and a Micro-Channel Plate (MCP) multiplier. The beamline is also equipped with a silicon detector, installed downstream the stop TOF station. In this paper the design of the new system and the implemented readout electronics are presented. The tests performed on the single time pick-off station are reported: they show that the maximum contribution to the timing resolution given by both the intrinsic MCP resolution and the electronics is ⩽500 ps (FWHM). For these tests, single particle pulsed beams of 2–5 MeV protons and 10 MeV "1"2C"3"+ ions, to simulate typical AMS conditions, were used. The preliminary TOF and TOF-E (TOF-energy) measurements performed with carbon beams after the installation of the new system on the AMS beam line are also discussed. These measurements were performed using the foil–MCP as the start stage and a silicon detector as the stop stage. The spectra acquired with carbon ions suggest the presence of a small residual background from neighboring masses reaching the end of the beamline with the same energy as the rare isotope.

  13. Outline of a future security system to provide physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Rossnagel, A.

    1984-01-01

    Nuclear energy, within three or four decades, may become a main pillar of the world's energy supply. The author discusses the problems entailed by the necessity to protect nuclear facilities against assaults, and whether this can be ensured without interference with civic rights. The method applied by the author to show the significance of the problems is to explain the current situation, and to compare it with a plausible outline of the developments to be expected over the next 50 years. He shows the hazards to be taken into account due to criminal actions by persons from outside, or by persons working in nuclear facilities. A main problem is the fact that the security system to be set up has to encompass not only the nuclear installation itself, but also the surrounding area, and the measures to be taken will have an impact on the society, which necessarily will curtail personal freedom. The author presumes that the necessity to guarantee physical protection of nuclear facilities will lead to a modification of the meaning of basic rights, and states his anxiety that security for nuclear installations might affect our concept of freedom. (HSCH) [de

  14. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  15. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  16. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-05-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory’s (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude.

  17. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    International Nuclear Information System (INIS)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-01-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory's (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude

  18. Design and installation of high-temperature ultrasonic measuring system and grinder for nuclear fuel containing trans-uranium elements

    International Nuclear Information System (INIS)

    Serizawa, Hiroyuki; Kikuchi, Hironobu; Iwai, Takashi; Arai, Yasuo; Kurosawa, Makoto; Mimura, Hideaki; Abe, Jiro

    2005-07-01

    A high-temperature ultrasonic measuring system had been designed and installed in a glovebox (711-DGB) to study a mechanical property of nuclear fuel containing trans-uranium (TRU) elements. A figuration apparatus for the cylinder-type sample preparation had also been modified and installed in an established glovebox (142-D). The system consists of an ultrasonic probe, a heating furnace, cooling water-circulating system, a cooling air compressor, vacuum system, gas supplying system and control system. An A/D converter board and an pulsar/receiver board for the measurement of wave velocity were installed in a personal computer. The apparatus was modified to install into the glovebox. Some safety functions were supplied to the control system. The shape and size of the sample was revised to minimize the amount of TRU elements for the use of the measurement. The maximum sample temperature is 1500degC. The performance of the installed apparatuses and the glovebox were confirmed through a series of tests. (author)

  19. Proposal for the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system. Following a market survey carried out among 61 firms in ten Member States and 14 firms in three non-Member States, a call for tenders (IT-2624/EP/ATLAS) was sent on 19 April 2002 to four firms and three consortia in six Member States and two firms in one non-Member State. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE ITALIA (IT), the lowest bidder, for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system for a total amount not exceeding 2 840 000 euros (4 191 300 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. This procurement will be financed by the ATLAS Common Fund and CERN's contribution will not exceed 8...

  20. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    1999-01-01

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance of the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year

  1. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    Energy Technology Data Exchange (ETDEWEB)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance of the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.

  2. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    International Nuclear Information System (INIS)

    Nielsen, T K; Kjeldsen, M

    2010-01-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  3. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    Science.gov (United States)

    Nielsen, T. K.; Kjeldsen, M.

    2010-08-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  4. Development and implementation of computerized operator support systems in nuclear installations

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to address the development and implementation of computerized operator support systems (COSS) in nuclear installations. The requirements of operators in information management and job performance in a control room environment are discussed. These requirements, which must be agreed to by the operators, provide a focus for the developers of COSS for implementation in an operational environment. The design methodology presents good practice approaches derived from the experience gained and the lessons learned during actual development of the COSS. The team concept, pilot study and structured step by step phases of software development and implementation should help COSS developers to achieve the level of quality and reliability required. 8 figs, 1 tab

  5. Installation of spectrally selective imaging system in RF negative ion source

    International Nuclear Information System (INIS)

    Ikeda, K.; Kisaki, M.; Nagaoka, K.; Nakano, H.; Osakabe, M.; Tsumori, K.; Kaneko, O.; Takeiri, Y.; Wünderlich, D.; Fantz, U.; Heinemann, B.; Geng, S.

    2016-01-01

    A spectrally selective imaging system has been installed in the RF negative ion source in the International Thermonuclear Experimental Reactor-relevant negative ion beam test facility ELISE (Extraction from a Large Ion Source Experiment) to investigate distribution of hydrogen Balmer-α emission (H α ) close to the production surface of hydrogen negative ion. We selected a GigE vision camera coupled with an optical band-path filter, which can be controlled remotely using high speed network connection. A distribution of H α emission near the bias plate has been clearly observed. The same time trend on H α intensities measured by the imaging diagnostic and the optical emission spectroscopy is confirmed

  6. PPSL - the newly installed analytical system for the detection of irradiated food

    International Nuclear Information System (INIS)

    Guzik, G.P.; Stachowicz, W.

    2006-01-01

    Newly installed in the Laboratory for Detection of Irradiated Food at the beginning of 2005 Pulsed PhotoStimulated Luminescence method (PPSL) is described. Methodology of the PPSL examination of food is simple: the analysed sample is dispensed into a Petri dish in a thin layer and placed into a sample chamber. the sample is exposed to pulsed laser infra-red light emitted by an array of diodes (IR LEDs). The PPSL signal produced in the system by luminescence released from photostimulated mineral debris of the sample is stored by a photomultiplier and the created numerical signal transmitted to the PC. it has been found, that screening by means of the PPSL apparatus is easy, effective and inexpensive. The method provides the fastest way to gain results whether food product is irradiated

  7. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  8. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  9. Parallel Work of CO2 Ejectors Installed in a Multi-Ejector Module of Refrigeration System

    Science.gov (United States)

    Bodys, Jakub; Palacz, Michal; Haida, Michal; Smolka, Jacek; Nowak, Andrzej J.; Banasiak, Krzysztof; Hafner, Armin

    2016-09-01

    A performance analysis on of fixed ejectors installed in a multi-ejector module in a CO2 refrigeration system is presented in this study. The serial and the parallel work of four fixed-geometry units that compose the multi-ejector pack was carried out. The executed numerical simulations were performed with the use of validated Homogeneous Equilibrium Model (HEM). The computational tool ejectorPL for typical transcritical parameters at the motive nozzle were used in all the tests. A wide range of the operating conditions for supermarket applications in three different European climate zones were taken into consideration. The obtained results present the high and stable performance of all the ejectors in the multi-ejector pack.

  10. Installation and pre-commissioning of the cryogenic system of JT-60SA tokamak

    Science.gov (United States)

    Hoa, C.; Michel, F.; Roussel, P.; Fejoz, P.; Girard, S.; Goncalves, R.; Lamaison, V.; Natsume, K.; Kizu, K.; Koide, Y.; Yoshida, K.; Cardella, A.; Portone, A.; Verrecchia, M.; Wanner, M.; Beauvisage, J.; Bertholat, F.; Gaillard, G.; Heloin, V.; Langevin, B.; Legrand, J.; Maire, S.; Perrier, J. M.; Pudys, V.

    2017-02-01

    The cryogenic system for the superconducting tokamak JT-60SA is currently being commissioned in Naka, Japan and shall be ready for operation in summer 2016. This contribution is part of the Broader Approach agreement between Japan and Europe. With an equivalent refrigeration capacity of about 9.5 kW at 4.5 K the cryogenic system will supply cryo-pump panels at 3.7 K, superconducting magnets and their structures at 4.4 K, high temperature superconducting current leads at 50 K and thermal shields between 80 K and 100 K. The system has been specifically designed to handle large pulse loads at 4.4 K during plasma operation. The mechanical and electrical assembly of the cryogenic system has been achieved within six months by October 2015. The main contractor Air Liquide Advanced Technology (AL-aT) have supplied eight parallel working screw compressors with a common oil removal and dryer system, a Refrigeration Cold Box and an Auxiliary Cold box with cold rotating machines. F4E has provided six GHe storage vessels and QST has provided the complete infrastructure and the facilities for the utilities. The paper gives an overview of the main design features, the infrastructure and the status of installation and pre-commissioning.

  11. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  12. Practices for improving the serviceability of linings installations in open systems

    International Nuclear Information System (INIS)

    Spieres, G.V.; Tombaugh, R.S.

    2001-01-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  13. Total-System Performance Assessment for the Yucca Mountain Site

    International Nuclear Information System (INIS)

    Wilson, M.L.

    2001-01-01

    Yucca Mountain, Nevada, is under consideration as a potential site for a repository for high-level radioactive waste. Total-system performance-assessment simulations are performed to evaluate the safety of the site. Features, events, and processes have been systematically evaluated to determine which ones are significant to the safety assessment. Computer models of the disposal system have been developed within a probabilistic framework, including both engineered and natural components. Selected results are presented for three different total-system simulations, and the behavior of the disposal system is discussed. The results show that risk is dominated by igneous activity at early times, because the robust waste-package design prevents significant nominal (non-disruptive) releases for tens of thousands of years or longer. The uncertainty in the nominal performance is dominated by uncertainties related to waste-package corrosion at early times and by uncertainties in the natural system, most significantly infiltration, at late times

  14. Effectiveness of Physical Barriers Installation for Prevention of Incidents in Mexico City’s Subway System

    OpenAIRE

    Portillo-Villasana, Gerardo de Jesús; Huerta-Barrientos, Aida; Dillarza Andrade, Yazmin

    2017-01-01

    Nowadays, suicides inside the installations of subway platforms are considered a public health problem in Mexico City. One solution to prevent them is the installation of physical barriers, but their high cost is unattractive for governmental authorities. Traditional approaches of research on the effectiveness of physical barriers for preventing suicides have been limited to analyzing statistically the effects of installing platform screen doors and blue lights on subway platforms. Although c...

  15. RMR. A new portable Reactivity Measuring System installed at NPP Paks

    International Nuclear Information System (INIS)

    Czibok, T.; Horvath, C.; Bara, P.; Dezsoe, Z.; Laz, J.; Vegh, J.; Pos, I.

    2003-01-01

    man-machine interface of the RMR. System functions and results are illustrated with measured data recorded during the last startup of Unit 3. In 2002 the first version of RMR was installed and tested at Unit 3, in 2003 the final version was installed at all Paks NPP units. (author)

  16. Recommendations for the design and the installation of large laser scanning microscopy systems

    Science.gov (United States)

    Helm, P. Johannes

    2012-03-01

    Laser Scanning Microscopy (LSM) has since the inventions of the Confocal Scanning Laser Microscope (CLSM) and the Multi Photon Laser Scanning Microscope (MPLSM) developed into an essential tool in contemporary life science and material science. The market provides an increasing number of turn-key and hands-off commercial LSM systems, un-problematic to purchase, set up and integrate even into minor research groups. However, the successful definition, financing, acquisition, installation and effective use of one or more large laser scanning microscopy systems, possibly of core facility character, often requires major efforts by senior staff members of large academic or industrial units. Here, a set of recommendations is presented, which are helpful during the process of establishing large systems for confocal or non-linear laser scanning microscopy as an effective operational resource in the scientific or industrial production process. Besides the description of technical difficulties and possible pitfalls, the article also illuminates some seemingly "less scientific" processes, i.e. the definition of specific laboratory demands, advertisement of the intention to purchase one or more large systems, evaluation of quotations, establishment of contracts and preparation of the local environment and laboratory infrastructure.

  17. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  18. Size matters: Installed maximal unit size predicts market life cycles of electricity generation technologies and systems

    International Nuclear Information System (INIS)

    Li, N.

    2008-01-01

    The electricity generation technologies and systems are complex and change in very dynamic fashions, with a multitude of energy sources and prime movers. Since an important concept in generator design is the 'economies of scale', we discover that the installed maximal unit size (capacity) of the generators is a key 'envelope-pushing' characteristic with logistical behaviors. The logistical wavelet analysis of the max unit sizes for different fuels and prime movers, and the cumulative capacities, reveals universal quantitative features in the aggregate evolution of the power industry. We extract the transition times of the max sizes (spanning 10-90% of the saturation limits) for different technologies and systems, and discover that the max size saturation in the 90-99% range precedes the saturation of cumulative capacities of the corresponding systems in the US. While these universal laws are still empirical, they give us a simple yet elegant framework to examine the evolution of the power industry and markets in predictive, not just descriptive, terms. Such laws give us a quantitative tool to spot trends and predict future development, invaluable in planning and resource allocation based on intrinsic technology and system market life cycles

  19. Installation of a variable-angle spectrometer system for monitoring diffuse and global solar radiation

    Science.gov (United States)

    Ormachea, O.; Abrahamse, A.; Tolavi, N.; Romero, F.; Urquidi, O.; Pearce, J. M.; Andrews, R.

    2013-11-01

    We report on the design and installation of a spectrometer system for monitoring solar radiation in Cochabamba, Bolivia. Both the light intensity and the spectral distribution affect the power produced by a photovoltaic device. Local variations in the solar spectrum (especially compared to the AM1.5 standard) may have important implications for device optimization and energy yield estimation. The spectrometer system, based on an Ocean Optics USB4000 (300-900nm) spectrometer, was designed to increase functionality. Typically systems only record the global horizontal radiation. Our system moves a fiber-optic cable 0-90 degrees and takes measurements in 9 degree increments. Additionally, a shadow band allows measurement of the diffuse component of the radiation at each position. The electronic controls utilize an Arduino UNO microcontroller to synchronizes the movement of two PAP bipolar (stepper) motors with the activation of the spectrometer via an external trigger. The spectrometer was factory calibrated for wavelength and calibrated for absolute irradiance using a Sellarnet SL1-Cal light source. We present preliminary results from data taken March-June, 2013, and comment on implications for PV devices in Cochabamba.

  20. Irradiation process validation in the new conveyor system installed at PISI: special dosimetry

    International Nuclear Information System (INIS)

    Pantano, Barbara P.; Docters, Andrea S.

    2009-01-01

    Semi Industrial Irradiation Plant (PISI) is a multipurpose facility which uses 60 Co sources to treat different products with numerous purposes, such as sterilization of medical devices, pharmaceutical and veterinarian products; control of pathogenic microorganisms, shelf-life extension and insect disinfestation of food, among others. In order to achieve the desired effect, the product is carried inside the irradiation chamber by means of a conveyor system, and it is exposed to radiation following a pre-established path. The recent installation of a new conveyor system at PISI demands the execution of a thorough validation programme. The scope of this presentation is to describe the dose mapping tasks that will be performed in order to characterize the irradiator and its new conveyor system with respect to distribution and variability of dose, complying with international standards on good irradiation practices. Information about the distribution and variability of dose in a product irradiated under defined conditions will allow the obtaining of process parameters which will conform the process specifications in future routine irradiations. The initial stages of the Validation Programme are the Installation Qualification, the Operational Qualification (OQ) and the Performance Qualification (PQ). To accomplish the IQ diverse tests are being carried out at PISI in order to verify that the system has been installed and is operating according to its technical specifications. Both OQ and PQ require dose mapping on simulated and real product, respectively. Dose mapping consists on placing dosimeters on a process load of homogeneous material -under certain irradiator and process parameters- according to a three-dimensional pre-established placement pattern. Since the replacement of the conveyor system introduces a significant modification in the source-to-product geometry, therefore in dose distribution, there is no reference dosimetry data available, so a more exhaustive

  1. Design, Observing and Data Systems, and Final Installation of the NEPTUNE Canada Regional Cabled Ocean Observatory

    Science.gov (United States)

    Barnes, C. R.; Best, M. M.; Johnson, F. R.; Phibbs, P.; Pirenne, B.

    2009-05-01

    NEPTUNE Canada (NC; www.neptunecanada.ca) will complete most of the installation of the world's first regional cabled ocean observatory in late 2009 off Canada's west coast. It will comprise five main observatory nodes (100-2700m water depths) linked by an 800km backbone cable delivering 10kVDC power and 10Gbps communications bandwidth to hundreds of sensors, with a 25-year design life. Infrastructure (100M) and initial operational funding (20M) is secured. University of Victoria (UVic) leads a consortium of 12 Canadian universities, hosts the coastal VENUS cabled observatory, with Ocean Networks Canada (ONC) providing management oversight. Observatory architecture has a trunk and branch topology. Installed in late 2007, the backbone cable loops from/to UVic's Port Alberni shore station. The wet plant's design, manufacture and installation was contracted to Alcatel-Lucent. Each node provides six interface ports for connection of science instrument arrays or extensions. Each port provides dual optical Ethernet links and up to 9kW of electrical power at 400VDC. Junction boxes, designed and built by OceanWorks support up to 10 instruments each and can be daisy- chained. They accommodate both serial and 10/100 Ethernet instruments, and provide a variety of voltages (400V, 48V, 24V, 15V). Backbone equipment has all been qualified and installed; shore station re-equipping is complete; junction boxes are manufactured. A major marine program will deploy nodes and instruments in July-September 2009; instruments to one node will probably be deferred until 2010. Observatory instruments will be deployed in subsurface (boreholes), on seabed, and buoyed through the water column. Over 130 instruments (over 40 different types) will host several hundred sensors; mobile assets include a tethered crawler and a 400m vertical profiler. Experiments will address: earthquake dynamics and tsunami hazards; fluid fluxes in both ocean crust and sediments, including gas hydrates; ocean

  2. Three-tiered integration of PACS and HIS toward next generation total hospital information system.

    Science.gov (United States)

    Kim, J H; Lee, D H; Choi, J W; Cho, H I; Kang, H S; Yeon, K M; Han, M C

    1998-01-01

    The Seoul National University Hospital (SNUH) started a project to innovate the hospital information facilities. This project includes installation of high speed hospital network, development of new HIS, OCS (order communication system), RIS and PACS. This project aims at the implementation of the first total hospital information system by seamlessly integrating these systems together. To achieve this goal, we took three-tiered systems integration approach: network level, database level, and workstation level integration. There are 3 loops of networks in SNUH: proprietary star network for host computer based HIS, Ethernet based hospital LAN for OCS and RIS, and ATM based network for PACS. They are linked together at the backbone level to allow high speed communication between these systems. We have developed special communication modules for each system that allow data interchange between different databases and computer platforms. We have also developed an integrated workstation in which both the OCS and PACS application programs run on a single computer in an integrated manner allowing the clinical users to access and display radiological images as well as textual clinical information within a single user environment. A study is in progress toward a total hospital information system in SNUH by seamlessly integrating the main hospital information resources such as HIS, OCS, and PACS. With the three-tiered systems integration approach, we could successfully integrate the systems from the network level to the user application level.

  3. Total-System Analyzer for performance assessment of Yucca Mountain

    International Nuclear Information System (INIS)

    Wilson, M.L.; Lauffer, F.C.; Cummings, J.C.; Zieman, N.B.

    1990-01-01

    The Total-System Analyzer is a modular computer program for probabilistic total-system performance calculations. The code employs stratified random sampling from model parameter distribution functions to generate multiple realizations of the system. The results of flow and transport calculations for each realization are combined into a probability distribution function of the system response as indicated by the performance measure. We give a detailed description of the code and present results for four example problems simulating the release of radionuclides from a proposed high-level-waste repository at Yucca Mountain, Nevada. The example simulations illustrate the impact of significant variation of percolation flux and sorption on radionuclide releases. We discuss the effects of numerical sampling error and of correlations among the model parameters. 20 refs., 7 figs., 2 tabs

  4. Total anomalous systemic venous drainage in left heterotaxy syndrome.

    Science.gov (United States)

    Khandenahally, Ravindranath S; Deora, Surender; Math, Ravi S

    2013-04-01

    Total anomalous systemic venous drainage is an extremely rare congenital heart defect. In this study we describe an 11-year-old girl who presented with a history of fatigue and central cyanosis that she had had since early childhood with unremarkable precordial examination results. Investigations revealed left heterotaxy with all systemic venous drainage to the left-sided atrium with non-compaction of the left ventricle.

  5. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  6. 21 CFR 862.1470 - Lipid (total) test system.

    Science.gov (United States)

    2010-04-01

    ... used in the diagnosis and treatment of various diseases involving lipid metabolism and atherosclerosis... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Lipid (total) test system. 862.1470 Section 862.1470 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED...

  7. Micro Total Analysis Systems: Microfluidic aspects, integration concept and applications

    NARCIS (Netherlands)

    van den Berg, Albert; Lammerink, Theodorus S.J.

    1997-01-01

    In this contribution three aspects of miniaturized total analysis systems (µTAS) are described and discussed in detail. First, an overview of microfabricated components for fluid handling is given. A description of the importance of sampling- and fluid-handling techniques is followed by details of

  8. Total Water Management, the New Paradigm for Urban Water Systems

    Science.gov (United States)

    There is a growing need for urban water managers to take a more holistic view of their water resource systems as population growth, urbanization, and current resource management practices put different stresses on local water resources and urban infrastructure. Total Water Manag...

  9. The impact of a total reward system of work engagement

    Directory of Open Access Journals (Sweden)

    Crystal Hoole

    2016-11-01

    Research purpose: The overall purpose of this study was to explore the relationship between total rewards and work engagement in a South African context and to determine which reward categories predict work engagement. The study further endeavoured to determine whether gender and age had a moderating effect on the relationship between total rewards and engagement. Motivation for the study: Statistics report that less than 30% of all working people are optimally engaged in their work. Considering that individuals spend more than a third of their lives at work committing themselves emotionally, physically and psychologically – research indicates that employees are no longer satisfied with traditional reward systems and want to feel valued and appreciated. Research approach, design and method: In this quantitative, cross-sectional research design using a non-probability convenience and purposive sampling strategy, 318 questionnaires were collected and analysed from financial institutions in Gauteng in which opinions were sought on the importance of different types of rewards structures and preferences, and how engaged they are in their workplace. The 17-item UWES and Nienaber total reward preference model were the chosen measuring instruments. Main findings: A small statistically significant correlation (r = 0.25; p < 0.05; small effect was found between total rewards and work engagement, and 12% of the variance of work engagement was explained. Only performance and career management significantly predicted work engagement. Practical/Managerial implications: Although small, the significant correlation between total rewards and work engagement implies that total rewards are important motivators for employees in the workplace. Of the total rewards scales tested, only performance and career management significantly predicted work engagement, suggesting that more research is needed. Organisations seeking to implement total reward strategies should pay specific

  10. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  11. Computer-based anthropometrical system for total body irradiation.

    Science.gov (United States)

    Sánchez-Nieto, B; Sánchez-Doblado, F; Terrón, J A; Arráns, R; Errazquin, L

    1997-05-01

    For total body irradiation (TBI) dose calculation requirements, anatomical information about the whole body is needed. Despite the fact that video image grabbing techniques are used by some treatment planning systems for standard radiotherapy, there are no such systems designed to generate anatomical parameters for TBI planning. The paper describes an anthropometrical computerised system based on video image grabbing which was purpose-built to provide anatomical data for a PC-based TBI planning system. Using software, the system controls the acquisition and digitalisation of the images (external images of the patient in treatment position) and the measurement procedure itself (on the external images or the digital CT information). An ASCII file, readable by the TBI planning system, is generated to store the required parameters of the dose calculation points, i.e. depth, backscatter tissue thickness, thickness of inhomogeneity, off-axis distance (OAD) and source to skin distance (SSD).

  12. A database system for the control of radioactive effluents generated by the IPEN-CNEN/SP installations

    International Nuclear Information System (INIS)

    Maduar, M.F.

    1992-01-01

    A PC-compatible database system has been developed in order to optimize the control of liquid and gaseous effluents generated by the installations of IPEN-CNEN/SP. The system implements source-term generation, optimizes the discharge control of the effluents and allows several ways for the retrieval of data concerning to the effluents. (author)

  13. Economic analysis model for total energy and economic systems

    International Nuclear Information System (INIS)

    Shoji, Katsuhiko; Yasukawa, Shigeru; Sato, Osamu

    1980-09-01

    This report describes framing an economic analysis model developed as a tool of total energy systems. To prospect and analyze future energy systems, it is important to analyze the relation between energy system and economic structure. We prepared an economic analysis model which was suited for this purpose. Our model marks that we can analyze in more detail energy related matters than other economic ones, and can forecast long-term economic progress rather than short-term economic fluctuation. From view point of economics, our model is longterm multi-sectoral economic analysis model of open Leontief type. Our model gave us appropriate results for fitting test and forecasting estimation. (author)

  14. Towards a Real-Time Embedded System for Water Monitoring Installed in a Robotic Sailboat.

    Science.gov (United States)

    Silva Junior, Andouglas Goncalves da; Lima Sa, Sarah Thomaz de; Santos, Davi Henrique Dos; Negreiros, Álvaro Pinto Ferrnandes de; Souza Silva, João Moreno Vilas Boas de; Álvarez Jácobo, Justo Emílio; Garcia Gonçalves, Luiz Marcos

    2016-08-08

    Problems related to quality (and quantity) of water in natural resources or in artificial reservoirs are frequently arising and are at the center of attention of authorities and governments around the world. Many times the monitoring is not performed in an efficient time frame and a precise manner, whereas the adoption of fast and punctual solutions would undoubtedly improve the water quality and consequently enhance the life of people. To minimize or diminish such kinds of problems, we propose an architecture for sensors installed in a robotic platform, an autonomous sail boat, able to acquire raw data relative to water quality, to process and make them available to people that might be interested in such information. The main contributions are the sensors architecture itself, which uses low cost sensors, with practical experimentation done with a prototype. Results show data collected for points in lakes and rivers in the northeast of Brazil. This embedded system is fixed in the sailboat robot with the intention to facilitate the study of water quality for long endurance missions. This robot can help monitoring water bodies in a more consistent manner. Nonetheless the system can also be used with fixed vases or buoys in strategic points.

  15. Towards a Real-Time Embedded System for Water Monitoring Installed in a Robotic Sailboat

    Directory of Open Access Journals (Sweden)

    Andouglas Goncalves da Silva Junior

    2016-08-01

    Full Text Available Problems related to quality (and quantity of water in natural resources or in artificial reservoirs are frequently arising and are at the center of attention of authorities and governments around the world. Many times the monitoring is not performed in an efficient time frame and a precise manner, whereas the adoption of fast and punctual solutions would undoubtedly improve the water quality and consequently enhance the life of people. To minimize or diminish such kinds of problems, we propose an architecture for sensors installed in a robotic platform, an autonomous sail boat, able to acquire raw data relative to water quality, to process and make them available to people that might be interested in such information. The main contributions are the sensors architecture itself, which uses low cost sensors, with practical experimentation done with a prototype. Results show data collected for points in lakes and rivers in the northeast of Brazil. This embedded system is fixed in the sailboat robot with the intention to facilitate the study of water quality for long endurance missions. This robot can help monitoring water bodies in a more consistent manner. Nonetheless the system can also be used with fixed vases or buoys in strategic points.

  16. Totally implantable total artificial heart and ventricular assist device with multipurpose miniature electromechanical energy system.

    Science.gov (United States)

    Takatani, S; Orime, Y; Tasai, K; Ohara, Y; Naito, K; Mizuguchi, K; Makinouchi, K; Damm, G; Glueck, J; Ling, J

    1994-01-01

    A multipurpose miniature electromechanical energy system has been developed to yield a compact, efficient, durable, and biocompatible total artificial heart (TAH) and ventricular assist device (VAD). Associated controller-driver electronics were recently miniaturized and converted into hybrid circuits. The hybrid controller consists of a microprocessor and controller, motor driver, Hall sensor, and commutation circuit hybrids. The sizing study demonstrated that all these components can be incorporated in the pumping unit of the TAH and VAD, particularly in the centerpiece of the TAH and the motor housing of the VAD. Both TAH and VAD pumping units will start when their power line is connected to either the internal power pack or the external battery unit. As a redundant driving and diagnostic port, an emergency port was newly added and will be placed in subcutaneous location. In case of system failure, the skin will be cut down, and an external motor drive or a pneumatic driver will be connected to this port to run the TAH. This will minimize the circulatory arrest time. Overall efficiency of the TAH without the transcutaneous energy transmission system was 14-18% to deliver pump outputs of 4-9 L/min against the right and left afterload pressures of 25 and 100 mm Hg. The internal power requirement ranged from 6 to 13 W. The rechargeable batteries such as NiCd or NiMH with 1 AH capacity can run the TAH for 30-45 min. The external power requirement, when TETS efficiency of 75% was assumed, ranged from 8 to 18 W. The accelerated endurance test in the 42 degrees C saline bath demonstrated stable performance over 4 months. Long-term endurance and chronic animal studies will continue toward a system with 5 years durability by the year 2000.

  17. Installation of the product transport system and control system for the Co-60 irradiator at the Institute of Investigations of the Alimentary Industry (IIIA), La Havana, Cuba

    International Nuclear Information System (INIS)

    Tran Khac An; Le Minh Tuan; Pham Thi Thu Hong; Nguyen Thanh Cuong; Huynh Dong Phuong; Ha Thanh Viet; Truong Vu Thanh Nhan

    2016-01-01

    Under the protocol of international cooperation in science and technology between Vietnam and Cuba - “Installation of the product transport system and control system for the Cobalt-60 irradiator at the Institute of Investigations of the Alimentary Industry (IIIA)”, the renovation of the irradiator has been started since 2012 and carried out by Research and Development Center for Radiation Technology (VINAGAMMA). The renovation work comprises the installation of the tote box transport system that was designed and constructed by Isotope Institute Budapest, Hungary, the installation of the PLC based control system which were designed and constructed by VINAGAMMA, installations of technological systems and training Cuban irradiator operators. The project has been successfully implemented and the industrial Co-60 irradiator with new control system has been put into operation. (author)

  18. A modernized and versatile startup reactivity measuring system installed at NPP Paks and its application for subcritical systems

    International Nuclear Information System (INIS)

    Czibok, T.; Dezso, Z.; Horvath, Cs.; Lipcsei, S.; Vegh, J.; Pos, I.

    2006-01-01

    In 2004 the Hungarian Paks NPP completed a project for upgrading the reactivity measuring system applied during reactor startup experiments. Almost all components of the previous system were replaced, only ex-core ionisation chambers remained unaltered. New hardware and software components were introduced for neutron flux signal handling, for data acquisition, as well as for measurement evaluation and data presentation. High-precision picoamper meters were installed at each reactor unit, current signals are handled by a portable signal processing unit. The system applies an accurate on-line reactivity calculation algorithm based on the point-kinetic model with six delayed neutron groups. Detailed off-line evaluation and analysis of startup measurements can be performed on the portable unit, as well. The paper describes the architecture, data acquisition modules, services and man-machine interface of the new system. Functions and results are illustrated with measured data recorded during a startup of Unit 3. In 2003 and 2004 the RMR was installed and tested at all Paks NPP units successfully and now it is in regular use during unit startups. The second part of the paper illustrates an extension of the new system to perform reactivity measurements using the well-known Rossi-α and Feynman-α statistical methods. The modified system was needed to estimate the reactivity of a subcritical system formed by damaged fuel assemblies stored at the fuel service pit of Paks Unit 2. Theoretical background of the applied algorithms is outlined, then results of validation tests and on site measurements are treated. The measurements have shown that the subcriticality of the damaged fuel was sufficiently deep if the high boron concentration in the fuel service pit was maintained

  19. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  20. Reduction of Airborne Bacterial Burden in the OR by Installation of Unidirectional Displacement Airflow (UDF) Systems.

    Science.gov (United States)

    Fischer, Sebastian; Thieves, Martin; Hirsch, Tobias; Fischer, Klaus-Dieter; Hubert, Helmine; Beppler, Steffen; Seipp, Hans-Martin

    2015-08-13

    Intraoperative bacterial contamination is a major risk factor for postoperative wound infections. This study investigated the influence of type of ventilation system on intraoperative airborne bacterial burden before and after installation of unidirectional displacement air flow systems. We microbiologically monitored 1286 surgeries performed by a single surgical team that moved from operating rooms (ORs) equipped with turbulent mixing ventilation (TMV, according to standard DIN-1946-4 [1999], ORs 1, 2, and 3) to ORs with unidirectional displacement airflow (UDF, according to standard DIN-1946-4, annex D [2008], ORs 7 and 8). The airborne bacteria were collected intraoperatively with sedimentation plates. After incubation for 48 h, we analyzed the average number of bacteria per h, peak values, and correlation to surgery duration. In addition, we compared the last 138 surgeries in ORs 1-3 with the first 138 surgeries in ORs 7 and 8. Intraoperative airborne bacterial burden was 5.4 CFU/h, 5.5 CFU/h, and 6.1 CFU/h in ORs 1, 2, and 3, respectively. Peak values of burden were 10.7 CFU/h, 11.1 CFU/h, and 11.0 CFU/h in ORs 1, 2, and 3, respectively). With the UDF system, the intraoperative airborne bacterial burden was reduced to 0.21 CFU/h (OR 7) and 0.35 CFU/h (OR 8) on average (pAirborne bacterial burden increased linearly with surgery duration in ORs 1-3, but the UDF system in ORs 7 and 8 kept bacterial levels constantly low (airborne bacterial burden (5 CFU/h vs. 0.29 CFU/h, pairborne bacterial burden under real clinical conditions by more than 90%. Although decreased postoperative wound infection incidence was not specifically assessed, it is clear that airborne microbiological burden contributes to surgical infections.

  1. A total system approach to sustainable pest management

    Science.gov (United States)

    Lewis, W. J.; van Lenteren, J. C.; Phatak, Sharad C.; Tumlinson, J. H.

    1997-01-01

    A fundamental shift to a total system approach for crop protection is urgently needed to resolve escalating economic and environmental consequences of combating agricultural pests. Pest management strategies have long been dominated by quests for “silver bullet” products to control pest outbreaks. However, managing undesired variables in ecosystems is similar to that for other systems, including the human body and social orders. Experience in these fields substantiates the fact that therapeutic interventions into any system are effective only for short term relief because these externalities are soon “neutralized” by countermoves within the system. Long term resolutions can be achieved only by restructuring and managing these systems in ways that maximize the array of “built-in” preventive strengths, with therapeutic tactics serving strictly as backups to these natural regulators. To date, we have failed to incorporate this basic principle into the mainstream of pest management science and continue to regress into a foot race with nature. In this report, we establish why a total system approach is essential as the guiding premise of pest management and provide arguments as to how earlier attempts for change and current mainstream initiatives generally fail to follow this principle. We then draw on emerging knowledge about multitrophic level interactions and other specific findings about management of ecosystems to propose a pivotal redirection of pest management strategies that would honor this principle and, thus, be sustainable. Finally, we discuss the potential immense benefits of such a central shift in pest management philosophy. PMID:9356432

  2. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  3. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  4. Total lymphoid irradiation in refractory systemic lupus erythematosus

    International Nuclear Information System (INIS)

    Ben-Chetrit, E.; Gross, D.J.; Braverman, A.; Weshler, Z.; Fuks, Z.; Slavin, S.; Eliakim, M.

    1986-01-01

    In two patients with systemic lupus erythematosus, conventional therapy was considered to have failed because of persistent disease activity and unacceptable side effects. Both were treated with total lymphoid irradiation without clinical benefit, despite adequate immunosuppression as documented by markedly reduced numbers of circulating T lymphocytes and T-lymphocyte-dependent proliferative responses in vitro. The first patient developed herpes zoster, gram-negative septicemia, neurologic symptoms, and deterioration of lupus nephritis. The second patient developed massive bronchopneumonia, necrotic cutaneous lesions, and progressive nephritis and died 2 weeks after completion of radiotherapy. These observations, although limited to two patients, indicate that total lymphoid irradiation in patients with severe systemic lupus erythematosus should be regarded as strictly experimental

  5. FY 1983 annual report on the research and development of automatic sewing systems. Total systems; 1983 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Total system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    The automatic sewing system technique research association has been commissioned by the Agency of Industrial Science and Technology for (research and development of automatic sewing systems). This program covers R and D of the elementary techniques for total systems and sewing preparation/processing, sewing/assembling, cloth handling, and system management/control. This report describes the results of the R and D efforts for the total systems. The basic data are collected for a total of 5 representative types of apparels. The technical problems involved in the current and automatic sewing systems are clarified for each apparel type, to collect the data for studying the test plant plans. The automatic sewing system for each apparel type is illustrated by images, for expressing the system concepts. The concept for the basic designs of the total system is drawn for FMS. For achieving the objective of reducing time for producing unit quantity of diversified types of clothes in small quantities at least by 50% from the current level, the study is focused on how the works are (flown) in the system, for which configuration of each device is studied. The basic specifications are drawn, viewed from development of the total system. (NEDO)

  6. Economics of human performance and systems total ownership cost.

    Science.gov (United States)

    Onkham, Wilawan; Karwowski, Waldemar; Ahram, Tareq Z

    2012-01-01

    Financial costs of investing in people is associated with training, acquisition, recruiting, and resolving human errors have a significant impact on increased total ownership costs. These costs can also affect the exaggerate budgets and delayed schedules. The study of human performance economical assessment in the system acquisition process enhances the visibility of hidden cost drivers which support program management informed decisions. This paper presents the literature review of human total ownership cost (HTOC) and cost impacts on overall system performance. Economic value assessment models such as cost benefit analysis, risk-cost tradeoff analysis, expected value of utility function analysis (EV), growth readiness matrix, multi-attribute utility technique, and multi-regressions model were introduced to reflect the HTOC and human performance-technology tradeoffs in terms of the dollar value. The human total ownership regression model introduces to address the influencing human performance cost component measurement. Results from this study will increase understanding of relevant cost drivers in the system acquisition process over the long term.

  7. Development of a totally integrated severe accident training system

    International Nuclear Information System (INIS)

    Kim, Ko Ryu; Park, Sun Hee; Choi, Young; Kim, Dong Ha

    2006-01-01

    Recently KAERI has developed the severe accident management guidance to establish the Korea standard severe accident management system. On the other hand the PC-based severe accident training simulator SATS has been developed, which uses the MELCOR code as the simulation engine. The simulator SATS graphically displays and simulates the severe accidents with interactive user commands. Especially the control capability of SATS could make a severe accident training course more interesting and effective. In this paper we will describe the development and functions of the electrical guidance module, HyperKAMG, and the SATS-HyperKAMG linkage system designed for a totally integrated and automated severe accident training. (author)

  8. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage

  9. TU-G-201-03: Imaging Systems in Radiotherapy: Buying, Installing, and Using

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, M. [Memorial Sloan-Kettering Cancer Center (United States)

    2015-06-15

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, and potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI

  10. Installation and management of the SPS and LEP control system computers

    International Nuclear Information System (INIS)

    Bland, Alastair

    1994-01-01

    Control of the CERN SPS and LEP accelerators and service equipment on the two CERN main sites is performed via workstations, file servers, Process Control Assemblies (PCAs) and Device Stub Controllers (DSCs). This paper describes the methods and tools that have been developed to manage the file servers, PCAs and DSCs since the LEP startup in 1989. There are five operational DECstation 5000s used as file servers and boot servers for the PCAs and DSCs. The PCAs consist of 90 SCO Xenix 386 PCs, 40 LynxOS 486 PCs and more than 40 older NORD 100s. The DSCs consist of 90 OS-968030 VME crates and 10 LynxOS 68030 VME crates. In addition there are over 100 development systems. The controls group is responsible for installing the computers, starting all the user processes and ensuring that the computers and the processes run correctly. The operators in the SPS/LEP control room and the Services control room have a Motif-based X window program which gives them, in real time, the state of all the computers and allows them to solve problems or reboot them. ((orig.))

  11. Internal Logistics System Selection with Total Cost of Ownership Analysis

    Science.gov (United States)

    Araújo, Inês; Pimentel, Carina; Godina, Radu; Matias, João C. O.

    2017-06-01

    In this paper a methodology was followed in order to support the decision-making of one industrial unit regarding its internal logistics system. The addressed factory was facing issues with their internal logistics approach. Some alternatives were pointed out and a proper total cost of ownership (TCO) analysis was developed. This analysis was taken in order to demonstrate the more cost-effective solution for the internal logistics system. This tool is more and more valued by the companies, due to their willing to reduce the costs that are associated with the way of doing business. Despite the proposal of the best choice for the internal logistics system of the enterprise, this study also intends to present some conclusions about the match between the nature of the industrial unit and the logistics systems that best fit the requirements of those.

  12. Total analysis systems with Thermochromic Etching Discs technology.

    Science.gov (United States)

    Avella-Oliver, Miquel; Morais, Sergi; Carrascosa, Javier; Puchades, Rosa; Maquieira, Ángel

    2014-12-16

    A new analytical system based on Thermochromic Etching Discs (TED) technology is presented. TED comprises a number of attractive features such as track independency, selective irradiation, a high power laser, and the capability to create useful assay platforms. The analytical versatility of this tool opens up a wide range of possibilities to design new compact disc-based total analysis systems applicable in chemistry and life sciences. In this paper, TED analytical implementation is described and discussed, and their analytical potential is supported by several applications. Microarray immunoassay, immunofiltration assay, solution measurement, and cell culture approaches are herein addressed in order to demonstrate the practical capacity of this system. The analytical usefulness of TED technology is herein demonstrated, describing how to exploit this tool for developing truly integrated analytical systems that provide solutions within the point of care framework.

  13. Mid-market transformation programs: programs to promote best practices in system specification and installation

    International Nuclear Information System (INIS)

    Rosenberg, Mitchell

    2003-01-01

    This paper summarizes the experience of programs designed to promote the adoption of best practices in equipment specification and installation among distributors and installation contractors in the residential central air conditioning and industrial compressed air equipment markets. For each of those markets, the paper identifies the current understanding of best practices, characterizes energy savings available from their adoption, assesses the nature of barriers to their adoption, and describes the operations and accomplishments of programs designed to address those barriers

  14. Installation and operation of the Plantwide Fire Protection Systems and related Domestic Water Supply Systems

    International Nuclear Information System (INIS)

    1991-12-01

    A safe work environment is needed to support the Savannah River Site (SRS) mission of producing special nuclear material. This Environmental Assessment (EA) assesses the potential environmental impact(s) of adding to and upgrading the Plantwide Fire Protection System and selected related portions of the Domestic Water Supply System at SRS, Aiken, South Carolina. The following objectives are expected to be met by this action: Prevent undue threat to public health and welfare from fire at SRS; prevent undue hazard to employees at SRS from fire; prevent unacceptable delay to vital DOE programs as a result of fire at SRS; keep fire related property damage at SRS to a manageable level;, and provide an upgraded supply of domestic water for the Reactor Areas. The Reactor Areas' domestic water supplies do not meet current demand capacity due to the age and condition of the 30-year old iron piping. In addition, the water quality for these supplies is not consistent with current SCDHEC requirements. Therefore, DOE proposes to upgrade this Domestic Water Supply System to meet current demand and quality levels, as well as the needs of fire protection system improvement

  15. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  16. Radiation protection system installation for the accelerator production of tritium/low energy demonstration accelerator project (APT/LEDA)

    CERN Document Server

    Wilmarth, J E; Tomei, T L

    2000-01-01

    The APT/LEDA personnel radiation protection system installation was accomplished using a flexible, modular proven system which satisfied regulatory orders, project design criteria, operational modes, and facility requirements. The goal of providing exclusion and safe access of personnel to areas where prompt radiation in the LEDA facility is produced was achieved with the installation of a DOE-approved Personnel Access Control System (PACS). To satisfy the facility configuration design, the PACS, a major component of the overall radiation safety system, conveniently provided five independent areas of personnel access control. Because of its flexibility and adaptability the Los-Alamos Neutron- Science-Center-(LANSCE)-designed Radiation Security System (RSS) was efficiently configured to provide the desired operational modes and satisfy the APT/LEDA project design criteria. The Backbone Beam Enable (BBE) system based on the LANSCE RSS provided the accelerator beam control functions with redundant, hardwired, ta...

  17. Geotechnical Issues in Total System Performance Assessments of Yucca Mountain

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; HOUSEWORTH, JIM; WILSON, MICHAEL L.

    1999-01-01

    A Total System Performance Assessment (TSPA) of Yucca Mountain consists of integrated sub-models and analyses of natural and engineered systems. Examples of subsystem models include unsaturated-zone flow and transport, seepage into drifts, coupled thermal hydrologic processes, transport through the engineered barrier system, and saturated-zone flow and transport. The TSPA evaluates the interaction of important processes among these subsystems, and it determines the impact of these processes on the overall performance measures (e.g., dose rate to humans). This paper summarizes the evaluation, abstraction, and combination of these subsystem models in a TSPA calculation, and it provides background on the individual TSPA subsystem components that are most directly impacted by geotechnical issues. The potential impact that geologic features, events, and processes have on the overall performance is presented, and an evaluation of the sensitivity of TSPA calculations to these issues is also provided

  18. Integrated dynamic policy management methodology and system for strategic environmental assessment of golf course installation policy in Taiwan

    International Nuclear Information System (INIS)

    Chen, Ching-Ho; Liu, Wei-Lin; Liaw, Shu-Liang

    2011-01-01

    Strategic environmental assessment (SEA) focuses primarily on assessing how policies, plans, and programs (PPPs) influence the sustainability of the involved regions. However, the processes of assessing policies and developing management strategies for pollution load and resource use are usually separate in the current SEA system. This study developed a policy management methodology to overcome the defects generated during the above processes. This work first devised a dynamic management framework using the methods of systems thinking, system dynamics, and Managing for Results (MFRs). Furthermore, a driving force-pressure-state-impact-response (DPSIR) indicator system was developed. The golf course installation policy was applied as a case study. Taiwan, counties of Taiwan, and the golf courses within those individual counties were identified as a system, subsystems, and objects, respectively. This study identified an object-linked double-layer framework with multi-stage-option to simultaneously to quantify golf courses in each subsystem and determine ratios of abatement and allocation for pollution load and resource use of each golf course. The DPSIR indicator values for each item of each golf course in each subsystem are calculated based on the options taken in the two decision layers. The summation of indicator values for all items of all golf courses in all subsystems according to various options is defined as the sustainability value of the policy. An optimization model and a system (IDPMS) were developed to obtain the greatest sustainability value of the policy, while golf course quantity, human activity intensity, total quantities of pollution load and resource use are simultaneously obtained. The solution method based on enumeration of multiple bounds for objectives and constraints (EMBOC) was developed for the problem with 1.95 x 10 128 combinations of possible options to solve the optimal solution in ten minutes using a personal computer with 3.0 GHz CPU

  19. Optimizing design concepts for a building with photovoltaic facility; Systeme d'optimisation pour la conception d'un batiment avec une installation photovoltaique

    Energy Technology Data Exchange (ETDEWEB)

    Le Bail, Yann; Bedard, Claude [Departement du genie de la construction, ETS, Montreal (Canada); Zmeureanu, Radu [Departement du genie du batiment, civil et de l' environement, Universite de Concordia, Montreal (Canada)

    2010-07-01

    In Canada, the energy used in buildings represents 30% of total national consumption. The use of renewable sources of energy is clearly of interest in efforts to reduce dependency on fossil fuels, greenhouse gas emissions and the total level of energy consumption. This study presents a system for economic and environmental performance optimization of a photovoltaic apparatus installed on the roof of a commercial building. This optimization system was tested on a building in Montreal. The results demonstrate that the apparatus does not give sufficient returns either economically or environmentally in Quebec, due to the fact that the electricity supply there is low-priced and clean but it would provide such returns in Munich, where the repurchase price of photovoltaic and conventional electricity is high and conventional electricity is also a polluter. The optimization system proposed in this study allows the environmental and economic returns from a photovoltaic apparatus to be studied.

  20. A TDR-based system for the localization of leaks in newly installed, underground pipes made of any material

    International Nuclear Information System (INIS)

    Cataldo, A; Cannazza, G; De Benedetto, E; Giaquinto, N

    2012-01-01

    In this paper, a time domain reflectometry-based system for locating leaks in underground pipes (made of any material) is presented. The proposed system simply requires that a biwire should be attached to the pipe (all along its length), at the time of installation. Basically, the biwire acts as a permanent sensing element that can be connected to the measurement instrument whenever it is necessary to check for the presence of leaks. It is worth emphasizing that such a simple and low-cost system could tremendously facilitate leak detection not only in water distribution systems but also in wastewater/sewer pipelines. The proposed system was validated through measurements on a newly installed pilot plant, in which a leak was intentionally provoked. (paper)

  1. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  2. Elastic scattering and total reaction cross section for the 6He +58Ni system

    Science.gov (United States)

    Morcelle, V.; Lichtenthäler, R.; Lépine-Szily, A.; Guimarães, V.; Mendes, D. R., Jr.; Pires, K. C. C.; de Faria, P. N.; Barioni, A.; Gasques, L.; Morais, M. C.; Shorto, J. M. B.; Zamora, J. C.; Scarduelli, V.; Condori, R. Pampa; Leistenschneider, E.

    2014-11-01

    Elastic scattering measurements of 6He + 58Ni system have been performed at the laboratory energy of 21.7 MeV. The 6He secondary beam was produced by a transfer reaction 9Be (7Li , 6He ) and impinged on 58Ni and 197Au targets, using the Radioactive Ion Beam (RIB) facility, RIBRAS, installed in the Pelletron Laboratory of the Institute of Physics of the University of São Paulo, Brazil. The elastic angular distribution was obtained in the angular range from 15° to 80° in the center of mass frame. Optical model calculations have been performed using a hybrid potential to fit the experimental data. The total reaction cross section was derived.

  3. Characterization of Site for Installing Open Loop Ground Source Heat Pump System

    Science.gov (United States)

    Yun, S. W.; Park, Y.; Lee, J. Y.; Yi, M. J.; Cha, J. H.

    2014-12-01

    This study was conducted to understand hydrogeological properties of site where open loop ground source heat pump system will be installed and operated. Groundwater level and water temperature were hourly measured at the well developed for usage of open loop ground source heat pump system from 11 October 2013 to 8 January 2014. Groundwater was sampled in January and August 2013 and its chemical and isotopic compositions were analyzed. The bedrock of study area is the Jurassic granodiorite that mainly consists of quartz (27.9 to 46.8%), plagioclase (26.0 to 45.5%), and alkali feldspar (9.5 to 18.7%). The groundwater level ranged from 68.30 to 68.94 m (above mean sea level). Recharge rate was estimated using modified watertable fluctuation method and the recharge ratios was 9.1%. The water temperature ranged from 14.8 to 15.0oC. The vertical Increase rates of water temperature were 1.91 to 1.94/100 m. The water temperature showed the significant seasonal variation above 50 m depth, but had constant value below 50 m depth. Therefore, heat energy of the groundwater can be used securely in open loop ground source heat pump system. Electrical conductivity ranged from 120 to 320 µS/cm in dry season and from 133 to 310 µS/cm in wet season. The electrical conductivity gradually decreased with depth. In particular, electrical conductivity in approximately 30 m depth decreased dramatically (287 to 249 µS/cm) in wet season. The groundwater was Ca-HCO3 type. The concentrations of dissolved components did not show the vertically significant variations from 0 to 250 m depth. The δ18O and δD ranged from -9.5 to -9.4‰ and from -69 to -68‰. This work is supported by the New and Renewable Energy of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) grant funded by the Korea government Ministry of Knowledge Economy (No.20123040110010).

  4. Installation of Monte Carlo neutron and photon transport code system MCNP4

    International Nuclear Information System (INIS)

    Takano, Makoto; Sasaki, Mikio; Kaneko, Toshiyuki; Yamazaki, Takao.

    1993-03-01

    The continuous energy Monte Carlo code MCNP-4 including its graphic functions has been installed on the Sun-4 sparc-2 work station with minor corrections. In order to validate the installed MCNP-4 code, 25 sample problems have been executed on the work station and these results have been compared with the original ones. And, the most of the graphic functions have been demonstrated by using 3 sample problems. Further, additional 14 nuclides have been included to the continuous cross section library edited from JENDL-3. (author)

  5. Total hydrocarbon content (THC) testing in liquid oxygen (LOX) systems

    Science.gov (United States)

    Meneghelli, B. J.; Obregon, R. E.; Ross, H. R.; Hebert, B. J.; Sass, J. P.; Dirschka, G. E.

    2015-12-01

    The measured Total Hydrocarbon Content (THC) levels in liquid oxygen (LOX) systems at Stennis Space Center (SSC) have shown wide variations. Examples of these variations include the following: 1) differences between vendor-supplied THC values and those obtained using standard SSC analysis procedures; and 2) increasing THC values over time at an active SSC test stand in both storage and run vessels. A detailed analysis of LOX sampling techniques, analytical instrumentation, and sampling procedures will be presented. Additional data obtained on LOX system operations and LOX delivery trailer THC values during the past 12-24 months will also be discussed. Field test results showing THC levels and the distribution of the THC's in the test stand run tank, modified for THC analysis via dip tubes, will be presented.

  6. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  7. Issues associated with a total systems approach to designing dependable systems

    International Nuclear Information System (INIS)

    Chisholm, G.H.

    1995-01-01

    A total system approach, developed by the nuclear-reactor-safety community, is extrapolated to the design of complex, critical systems. The essential properties of these systems are described, and a generic paradigm for subsequent designs is proposed

  8. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  9. GATEWAY Demonstrations: Philadelphia International Airport Apron Lighting: LED System Performance in a Trial Installation

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-30

    This report documents a trial installation of LED apron lighting that replaced the existing high-pressure sodium luminaires at Philadelphia International Airport. Such high-mast applications remain challenging for LED technology, and the lessons learned from this project may help facility managers and LED product manufacturers better meet those challenges.

  10. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Science.gov (United States)

    2010-07-01

    ... Analysis Checklists are included in API RP 14C you must utilize the analysis technique and documentation... device requirements for pipelines are under § 250.1004. (c) Specification for surface safety valves (SSV..., Recommended Practice for Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety...

  11. Installation of the liquid nitrogen tank for the external cryogenics system

    CERN Multimedia

    2001-01-01

    The picture shows the installation of the 50000l liquid nitrogen tank in its first position next to the SHL annex of the SX5 building. The tank will be moved to its final position after the completion of the surface tests.

  12. Analysis of normative requirements for the development and implementation of a quality management system in Brazilian nuclear installations and activities

    International Nuclear Information System (INIS)

    Kibrit, Eduardo

    2008-01-01

    The present work identifies, characterizes and analyses the normative requirements for the development and implementation of quality management systems in Brazilian nuclear installations and activities. The requirements established in standards IAEA GS-R-3, IAEA GS-G-3.1, IAEA DS 349, NBR ISO 9001:2000 e CNEN-NN-1.16 are critically analyzed. A correlation matrix of the applicable standards is presented and the related topics among them are identified. The standards IAEA GS-R-3, IAEA GS-G-3.1 and IAEA DS 349 define general requirements for establishing, implementing, assessing and continually improving an integrated management system in nuclear installations and activities, in IAEA member countries. The standard NBR ISO 9001:2000 establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard CNEN NN-1.16 establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The standard IAEA GS-R-3 that replaces the code IAEA 50-C-Q introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concepts of 'Quality Assurance' and 'Quality Management'. This new approach is aligned with the current tendency incorporating requirements of quality, safety, health, environment, security, economics and other in a unique management system. Examples of quality management systems implemented by Brazilian nuclear organizations and by nuclear organizations outside Brazil are analyzed and considered in the discussion of results. (author)

  13. Diagnosis of the operation state of photovoltaic water pumping systems installed in Pernambuco state, Brazil; Diagnostico do estado de funcionamento de sistemas de bombeamento de agua fotovoltaico (SBFV) instalados em Pernambuco

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Heitor Scalambrini [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil). Nucleo de Apoio a Projetos de Energias Renovaveis], Email: hscosta@ufpe.br

    2006-07-01

    The major projects concerning the dissemination of the use of photovoltaic solar energy (PVSE) in Brazil are located in the Northeast region. Particularly, the state of Pernambuco has the largest number of installations and the largest installed power of autonomous systems. There exist approximately 700 residencies, 250 schools and 150 water pumping systems among other applications using PVSE, totaling 250 k Wp installed in more than 80 cities of that State. This work analyses a diagnosis report on the state of functioning of 64 one-year-old water-pumping installations in 30 m to 60 m depth wells, driven by 300 to 1,600 Wp photovoltaic generators, the flows varying from 200 l/h to 6,000 l/h. Technical and non-technical problems were identified, ranging from improper location choice, wrong system dimensioning, inadequate photovoltaic generator installations, lack of user instruction and training, lack of responsibility definitions regarding the technical assistance and the needed follow-up. In the final part of this report proposals are enumerated concerning the establishment of a local and municipal organizing structure aiming the management of the water-pumping installations and the assurance of a larger success probability in the use of that technology. (author)

  14. Total System Performance Assessment for the Site Recommendation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-10-02

    As mandated in the Nuclear Waste Policy Act of 1982, the U.S. Department of Energy (DOE) has been investigating a candidate site at Yucca Mountain, Nevada, to determine whether it is suitable for development of the nation's first repository for permanent geologic disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Nuclear Waste Policy Amendments Act of 1987 directed that only Yucca Mountain be characterized to evaluate the site's suitability. Three main components of the DOE site characterization program are testing, design, and performance assessment. These program components consist of: Investigation of natural features and processes by analyzing data collected from field tests conducted above and below ground and from laboratory tests of rock, gas, and water samples Design of a repository and waste packages tailored to the site features, supported by laboratory testing of candidate materials for waste packages and design related testing in the underground tunnels where waste would be emplaced Quantitative estimates of the performance of the total repository system, over a range of possible conditions and for different repository configurations, by means of computer modeling techniques that are based on site and materials testing data and accepted principles of physics and chemistry. To date, DOE has completed and documented four major iterations of total system performance assessment (TSPA) for the Yucca Mountain site: TSPA-91 (Barnard et al. 1992), TSPA-93 (Wilson et al. 1994; CRWMS M and O 1994), TSPA-95 (CRWMS M and O 1995), and the Total System Performance Assessment-Viability Assessment (TSPA-VA) (DOE 1998a, Volume 3). Each successive TSPA iteration has advanced the technical understanding of the performance attributes of the natural features and processes and enhanced engineering designs. The next major iteration of TSPA is to be conducted in support of the next major programmatic milestone for the DOE, namely the

  15. Study of the performance of RPC system installed at the CMS experiment

    CERN Document Server

    SHOPOVA, Mariana

    2016-01-01

    The CMS (Compact Muon Solenoid) experiment is a general purpose detector, located at the CERN Large Hadron Collider (LHC). It has a muon spectrometer equipped with a redundant system composed of three different detector technologies - Resistive Plate Chambers (RPCs) and Drift Tubes (DTs) in the barrel and RPC and Cathode Strip Chambers (CSCs) in the endcap region. All three are used for muon reconstruction and triggering. The RPC detector system consists of a total of 1056 double-gap chambers, covering the pseudo-rapidity region up to eta below 1.6. Here are presented the Resistive Plate Chambers performance results for the period of 2015 and 2016 with pp collisions at 13 TeV. The stability of the RPC performance is reported in terms of efficiency, cluster size and rate distributions.

  16. FY 1984 annual report on the research and development of automatic sewing systems. Total systems; 1984 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Total system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-03-01

    The automatic sewing system technique research association has been commissioned by the Agency of Industrial Science and Technology for (research and development of automatic sewing systems). This program covers R and D of the elementary techniques for total systems and sewing preparation/processing, sewing/assembling, cloth handling, and system management/control. This report describes the results of the R and D efforts for the total systems. For producing diversified products in small quantities, which is the object of this R and D program, the target is set to reduce processing time by at least 50% from the current level. The efforts to achieve this target by solving the problems involved therein are made from the side of developing FMS and FA procedures, and apparel side. The program for the former investigates the required functions of individual sub-systems that constitute the total system, to clarify the technical targets of the core elementary techniques for each sub-system. The program for the latter analyzes the sewing steps for producing diversified clothes types, specifications for automatic operation, integration, standardization and coding of the steps, and so on, based on the results of studies on basic apparel types. (NEDO)

  17. Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas

    Science.gov (United States)

    1980-01-01

    A solar heating on cooling system is described which is designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 solargenics, series 76, flat plate collectors with a total area of 1,596 square feet. The solar loop circulates an ethylene glyco water solution through the collectors into a hot water system exchanger. The water storage subsystem consists of a heat exchanger, two 2,300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water water fixtures. The building cold water system provides make up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described.

  18. Cost of installing and operating an electronic clinical decision support system for maternal health care: case of Tanzania rural primary health centres.

    Science.gov (United States)

    Saronga, Happiness Pius; Dalaba, Maxwell Ayindenaba; Dong, Hengjin; Leshabari, Melkizedeck; Sauerborn, Rainer; Sukums, Felix; Blank, Antje; Kaltschmidt, Jens; Loukanova, Svetla

    2015-04-02

    Poor quality of care is among the causes of high maternal and newborn disease burden in Tanzania. Potential reason for poor quality of care is the existence of a "know-do gap" where by health workers do not perform to the best of their knowledge. An electronic clinical decision support system (CDSS) for maternal health care was piloted in six rural primary health centers of Tanzania to improve performance of health workers by facilitating adherence to World Health Organization (WHO) guidelines and ultimately improve quality of maternal health care. This study aimed at assessing the cost of installing and operating the system in the health centers. This retrospective study was conducted in Lindi, Tanzania. Costs incurred by the project were analyzed using Ingredients approach. These costs broadly included vehicle, computers, furniture, facility, CDSS software, transport, personnel, training, supplies and communication. These were grouped into installation and operation cost; recurrent and capital cost; and fixed and variable cost. We assessed the CDSS in terms of its financial and economic cost implications. We also conducted a sensitivity analysis on the estimations. Total financial cost of CDSS intervention amounted to 185,927.78 USD. 77% of these costs were incurred in the installation phase and included all the activities in preparation for the actual operation of the system for client care. Generally, training made the largest share of costs (33% of total cost and more than half of the recurrent cost) followed by CDSS software- 32% of total cost. There was a difference of 31.4% between the economic and financial costs. 92.5% of economic costs were fixed costs consisting of inputs whose costs do not vary with the volume of activity within a given range. Economic cost per CDSS contact was 52.7 USD but sensitive to discount rate, asset useful life and input cost variations. Our study presents financial and economic cost estimates of installing and operating an

  19. Code of practice and design principles, for installed radiological protection systems

    International Nuclear Information System (INIS)

    Powell, R.G.

    1980-09-01

    The main points on which a guide for designers and installers of radiological protection instrumentation (RPI) should be based have been examined by a small group of instrumentation engineers. The purpose of this document is to present a comprehensive and detailed review of these points. It is intended to give an overall coverage and serve as a reference document for specific points; it should also be of value to newcomers to the RPI field. The code presents a standard of good practice and takes the form of recommendations only. The contents cover: the requirement for RPI; design, availability and reliability, information displays, human factors, power supplies, manufacture, quality assurance, testing, cost, installation, operation, maintenance and documentation. Appendices include: Radon and thoron decay series, air sampling, reliability of component combinations and redundancy. (28 references). (author)

  20. Code of practice and design principles for installed radiological protection systems

    International Nuclear Information System (INIS)

    Powell, R.G.

    1979-03-01

    For some years there has been comprehensive guidance documentation for Nuclear Reactor Instrumentation, but apparently no corresponding guide for designers and installers of Radiological Protection Instrumentation. A small group of instrumentation engineers discussed this lack of a suitable guide, and they examined the main points on which it should be based. This document attempts to present a comprehensive and detailed review of these points. It is intended to give an overall coverage and serve as a reference document for specific points; it should also be of value to the newcomer to the Radiological Protection Instrumentation field. This Code of Practice represents a standard of good practice and takes the form of recommendations only. Each installation must be assessed individually, and agreement on its suitability must be reached locally by the designers and the officers responsible for safety and operation. (author)

  1. An Evaluation of the WSSC (Weapon System Support Cost) Cost Allocation Algorithms. II. Installation Support.

    Science.gov (United States)

    1983-06-01

    S XX3OXX, or XX37XX is found. As a result, the following two host-financed tenant support accounts currently will be treated as unit operations costs ... Horngren , Cost Accounting : A Managerial Emphasis, Prentice-Hall Inc., Englewood Cliffs, NJ, 1972. 10. D. B. Levine and J. M. Jondrow, "The...WSSC COST ALLOCATION Technical Report ~ALGORITHMS II: INSTALLATION SUPPORT 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR( S ) 9. CONTRACT OR GRANT NUMBER

  2. Peak Load Regulation and Cost Optimization for Microgrids by Installing a Heat Storage Tank and a Portable Energy System

    Directory of Open Access Journals (Sweden)

    Hong Zhang

    2018-04-01

    Full Text Available With the rapid growth of electricity demands, many traditional distributed networks cannot cover their peak demands, especially in the evening. Additionally, with the interconnection of distributed electrical and thermal grids, system operational flexibility and energy efficiency can be affected as well. Therefore, by adding a portable energy system and a heat storage tank to the traditional distributed system, this paper proposes a newly defined distributed network to deal with the aforementioned problems. Simulation results show that by adding a portable energy system, fossil fuel energy consumption and daily operation cost can be reduced by 8% and 28.29%, respectively. Moreover, system peak load regulating capacity can be significantly improved. However, by introducing the portable energy system to the grid, system uncertainty can be increased to some extent. Therefore, chance constrained programming is proposed to control the system while considering system uncertainty. By applying Particle Swarm Optimization—Monte Carlo to solve the chance constrained programming, results show that power system economy and uncertainty can be compromised by selecting appropriate confidence levels α and β. It is also reported that by installing an extra heat storage tank, combined heat and power energy efficiency can be significantly improved and the installation capacity of the battery can be reduced.

  3. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  4. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  5. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  6. A Sensitivity Study of the Impact of Installation Parameters and System Configuration on the Performance of Bifacial PV Arrays

    Energy Technology Data Exchange (ETDEWEB)

    Marion, William F [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Deline, Christopher A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Asgharzadeh, Amir [University of Iowa; Hansen, Clifford [Sandia National Laboratories; Stein, Joshua S. [Sandia National Laboratories; Toor, Fatima [University of Iowa

    2018-04-19

    In this paper, we present the effect of installation parameters (tilt angle, height above ground, and albedo) on the bifacial gain and energy yield of three south-facing photovoltaic (PV) system configurations: a single module, a row of five modules, and five rows of five modules utilizing RADIANCE-based ray tracing model. We show that height and albedo have a direct impact on the performance of bifacial systems. However, the impact of the tilt angle is more complicated. Seasonal optimum tilt angles are dependent on parameters such as height, albedo, size of the system, weather conditions, and time of the year. For a single bifacial module installed in Albuquerque, NM, USA (35 degrees N) with a reasonable clearance (~1 m) from the ground, the seasonal optimum tilt angle is lowest (~5 degrees) for the summer solstice and highest (~65 degrees) for the winter solstice. For larger systems, seasonal optimum tilt angles are usually higher and can be up to 20 degrees greater than that for a single module system. Annual simulations also indicate that for larger fixed-tilt systems installed on a highly reflective ground (such as snow or a white roofing material with an albedo of ~81%), the optimum tilt angle is higher than the optimum angle of the smaller size systems. We also show that modules in larger scale systems generate lower energy due to horizon blocking and large shadowing area cast by the modules on the ground. For albedo of 21%, the center module in a large array generates up to 7% less energy than a single bifacial module. To validate our model, we utilize measured data from Sandia National Laboratories' fixed-tilt bifacial PV testbed and compare it with our simulations.

  7. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  8. Total System Performance Assessment: Enhanced Design Alternative V

    International Nuclear Information System (INIS)

    N. Erb; S. Miller; V. Vallikat

    1999-01-01

    This calculation documents the total system performance assessment modeling of Enhanced Design Analysis (EDA) V. EDA V is based on the TSPA-VA base design which has been modified with higher thermal loading, a quartz sand invert, and line loading with 21 PWR waste packages that have 2-cm thick titanium grade 7 corrosion resistance material (CRM) drip shields placed over dual-layer waste packages composed of 'inside out' VA reference material (CRWMS M and O 1999a). This document details the changes and assumptions made to the VA reference Performance Assessment Model (CRWMS M and O 1998a) to incorporate the design changes detailed for EDA V. The performance measure for this evaluation is expected value dose-rate history. Time histories of dose rate are presented for EDA V and a Defense in Depth (DID) analysis base on EDA V. Additional details concerning the Enhanced Design Alternative II are provided in the 'LADS 3-12 Requests' interoffice correspondence (CRWMS M and O 1999a)

  9. Data acquisition and control system in a heavy water detritiation installation

    International Nuclear Information System (INIS)

    Stefan, Iuliana; Balteanu, Ovidiu; Retevoi, Carmen; Stefan, Liviu

    2002-01-01

    The experimental installation for extracting tritium and deuterium from the tritiated heavy water used as moderator in CANDU type nuclear reactors is described. The separated tritium of high purity can be used in the fusion reactors of the future or in various laboratory researches. The fluids implied in operating this installation require special safety measures to be taken to protect both the operational personnel and the environment. Accordingly, in the technologic room no personnel is allowed and hence parameter monitoring, analyses and the testing must be done by remote control equipment. The computers for monitoring, warning and testing, as well as the sensors are housed in the data acquisition room, separated from the control room. The values generated by the process variables are converted in electrical or pneumatic signals and subsequently transmitted to the subsystems of monitoring, control and protection. Data acquisition in the control room is ensured by a computer provided with a FieldPoint interface. So, the connection between I/O modules from the data acquisition room and the computer ensures a 115.2 kb/s speed. Measured values of the parameters are recorded and displayed in the control room. Here these are compared with preset limits of the process parameters and in case of abnormal behavior, an alarm is triggered both optically and acoustically. At the same time, the program which controls the inputs and the outputs makes decisions and issues corrective or preventive commands for the technological process or installation protection, respectively. A diagram illustrating the monitoring, using a LabView platform is presented

  10. Installation And Test Of Electron Beam Generation System To Produce Far-Infrared Radiation And X-Ray Pulses

    International Nuclear Information System (INIS)

    Wichaisirimongkol, Pathom; Jinamoon, Witoon; Khangrang, Nopadon; Kusoljariyakul, Keerati; Rhodes, Michael W.; Rimjaem, Sakhorn; Saisut, Jatuporn; Chitrlada, Thongbai; Vilaithong, Thiraphat; Wiedemann, Helmut

    2005-10-01

    SURIYA project at the Fast Neutron Research Facility, Chiang Mai University, aims to establish a facility to generate femtosecond electron beams. This electron beam can be used to generate high intensity far-infrared radiation and ultra-short X-ray pulses. The main components of the system are a 3 MeV RF electron gun with a thermionic cathode, an a-magnet as a bunch compressor, and post acceleration 15-20 MeV by a linear accelerator (linac). Between the main components, there are focusing quadrupole magnets and steering magnets to maintain the electron beam within a high vacuum tube. At the end of the beam transport line, a dipole magnet has been installed to function as a beam dump and an energy spectrometer. After the installation and testing of individual major components were completed, we have been investigating the generation of the electron beam, intense far- infrared radiation and ultra short X-ray pulses

  11. Product Lifecycle Management Technology Applied in Missile Launching Systems Production and Installation

    Directory of Open Access Journals (Sweden)

    V. O. Karasev

    2016-01-01

    Full Text Available The article highlights the problems in the construction of the launch-site "Vostochniy" production and installation logistic. The stages of complex high-end product lifecycle described. The concepts and techniques of life cycle management and variants of their application offered as solution of this problems. Practical way to optimize logistics and lifecycle management processes using ILS Suite multi-agent software submitted. Side effect of this solution is creating of relevant integrated logistic support database, that could be used in the future projects. Results for tests and some perspectives for future investigation described.

  12. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  13. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  14. Engineering task plan for the development of a high pressure water drill system for BY-105 saltwell screen installation

    International Nuclear Information System (INIS)

    RITTER, G.A.

    1999-01-01

    This engineering task plan identifies the activities required for developing an ultra high pressure water drill system for installation of a saltwell screen in Tank BY-105. A water drill system is needed to bore through the hard waste material in this tank because of the addition of Portland cement in the 1960s and/or 1970s. The activities identified in this plan include the design, procurement, and qualification testing of the water drill along with readiness preparations including developing operating procedures, training Operations personnel, and conducting an assessment of readiness

  15. Automatic postural response systems in individuals with congenital total blindness.

    Science.gov (United States)

    Nakata, H; Yabe, K

    2001-07-01

    This study examined the effects of the absence of vision from birth on automatic postural responses to platform displacements during stance. Postural responses were induced by producing randomly four types of perturbations which consisted of forward and backward translations, and toe up and down rotations. Nine congenitally totally blind and nine sighted adults served as subjects. EMG signals were recorded from four muscles in the right leg, and reaction time to somatosensory stimuli generated by platform displacements was measured by pushing a hand-held button. To assess the ability to control postural balance, the root mean square (RMS) values for lateral and antero-posterior sway before, during, and after perturbations were calculated. The EMG amplitude in the gastrocnemius muscle of a blind subject was smaller than that of a sighted subject with eyes closed. No significant differences were found between blind and sighted subjects in EMG latencies of the lower extremity muscles in response to perturbations. The blind subjects had significantly faster reaction times to somatosensory stimuli triggered by platform displacements, but in toe down rotations no significant difference was found between blind and sighted subjects. The difference in the EMG latencies and reaction times between the two groups suggests that blindness from birth may not affect the spinal stretch reflex, but may affect a volitional act mediated through the motor cortex. There were also no significant differences in the RMS values for postural sway between blind and sighted subjects with eyes open or closed, although blind subjects swayed more after backward translations than did sighted subjects with eyes open. Results suggest that the ability to control postural balance during perturbations was not affected by vision loss from birth. Our findings suggest that the automatic postural response systems of humans are unaffected by the absence of vision from birth and are rather hard wired.

  16. OUTCOMES REVIEW OF TOTAL KNEE REPLACEMENT WITH GENESIS II TOTAL KNEE SYSTEM: AUSTRALIAN ORTHOPAEDIC ASSOCIATION NATIONAL JOINT REPLACEMENT REGISTRY DATA

    Directory of Open Access Journals (Sweden)

    N. L. Logvinov

    2014-01-01

    Full Text Available ABSTRACT. The goal of the article was to review Genesis II Total Knee System use according to AoA NJRR report. Genesis II has been widely used in Russian Federation since 1996. The AoA NJRR report was studied in order to learn connection between number of revision procedures and surgeon’s skills or type of the System, adequate choice among cemented, cementless and hybrid fixation, number of surgeries using Genesis II Total Knee System annually, average revision rate for Genesis II and early cumulative revision rate.CONCLUSION. The systematic study of AoA NJRR allows us to make a conclusion that cemented fixation of Genesis II Total Knee System is mostly effective, and this fact is confirmed by domestic experience. 

  17. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L; Machado Filho, Remo Z [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros, Junior, Adory J [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  18. Radiation mapping of Jaipur city using compact aerial radiation monitoring system (CARMS) installed in mobile platform

    International Nuclear Information System (INIS)

    Jain, Amit; Chaudhury, Probal; Padmanabhan, N.; Pradeepkumar, K.S.; Sharma, D.N.; Thandra, Manu

    2010-01-01

    Full text: Widespread use of radioisotopes for social benefits through industrial, scientific and medical applications poses a potential for occurrence of radiological emergencies due to loss or misuse of the radioactive sources. Besides, as there is increased societal concern for radiation safety of man and environment, monitoring is needed as a confidence building measure. It is necessary to assess any possible increase in background radiation due to the operation of nuclear facilities or any other man made events. Any observable increase in normal radiation background is a precursor for the abnormal presence of radioactivity. As a part of emergency preparedness for response to radiological emergencies, BARC has taken up radiation mapping of all major cities. A mobile ground based radiation monitoring has been conducted around Jaipur city using state-of-the-art radiation monitoring systems and instruments. The systems were mounted in a vehicle at a height of 1.0 meter from the ground and the GPS antenna was mounted on top for clear satellite visibility. It was ensured that the gamma attenuation due to the body of the vehicle was minimal. The average speed of the vehicle was maintained at 30 km/h to ensure uniformity in distance during the data acquisition interval. The monitoring was carried out over two days and resulted in establishment of baseline dose rate data of the city, which will be useful in case of any radiological emergency. The detailed environmental radiation monitoring demonstrated the utility of the systems and the methodology for the assessment of large area ground contamination and also search and detection of any orphan radioactive sources through variations in background gamma radiation observations. The methodology adopted for analysis of the surveyed data is based on the interpretation of the changes in the mean value and standard deviation in the values in different regions of the surveyed area. During this monitoring exercise, total road

  19. Proposal for the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS experiment

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS Experiment. Following a market survey carried out among 22 firms in seven Member States and seven firms in two non-Member States, a call for tenders (IT-2576/EP/CMS) was sent on 17 February 1999 to two firms in two Member States and one firm in one non-Member State. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE (FR), the lowest bidder, for the supply and installation of a cryogenic helium refrigeration system for an amount of 4 552 500 euros, subject to revision, with an option for one liquid nitrogen dewar and a one-year extension of the warranty period, for an amount of 205 000 euros, subject to revision, bringing the total amount to 4 757 500 euros. At the rate of exchange given in the tender, this amount is equal to 7 612 000 Swiss francs. This procurement will be financed by...

  20. 21 CFR 862.1110 - Bilirubin (total or direct) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Bilirubin (total or direct) test system. 862.1110... Systems § 862.1110 Bilirubin (total or direct) test system. (a) Identification. A bilirubin (total or direct) test system is a device intended to measure the levels of bilirubin (total or direct) in plasma...

  1. Two year performance of a 10 kW CPV system installed in two areas of Saudi Arabia

    Science.gov (United States)

    Khonkar, Hussam; Alowais, Abdullah; Sheikho, Ayman; Alyahya, Abdulaziz; Alghamdi, Ahmed; Alsaedan, Abdullah; Eugenio, Nunilo N.; Alalweet, Fahad; Halawani, Mohammad; Alsaferan, Abdulrahman

    2014-09-01

    The three year KACST/IBM collaboration in solar technology research led to the design and development of a 10kW CPV system. The system is comprised of 81 PV modules, inverters and a tracking system and is grid connected. A primary and secondary optics were employed to reach 1600x concentration on multijunction solar cells. Two CPV trackers were installed in the city of Riyadh and one in the eastern coastal city of Al Khafji. These two areas differ in climatic conditions. Riyadh is mostly dry and very often hit by very strong sand storms while Al Khafji is very humid with sand storms. Very fine dusts and dirt carried by the storms hits the surface of the primary optics, Fresnel lens, of the system. In Riyadh, the particles stick to the lenses but accumulation in the surface is not much since it is blown away by wind. However, the humid condition of the coastal areas wets the dusts and makes it sticky, cumulating more dusts and dirt. This paper discusses in details the parts of the 10kW CPV system. It presents a comprehensive analysis of the system's performance since the time they were installed and operated. CPV systems are operated with the least number of personnel and supervision. However, dust and dirt lessens the amount of sunlight passing through the primary optics. It requires periodic cleaning of the Fresnel lens. Different methods of cleaning were tried to identify the efficient way to clean the system that results to a higher power generation. Corrections and modifications of the system to further increase power production are presented.

  2. Optimizing operation costs of the heating system of a household using model predictive control considering a local PV installation

    DEFF Research Database (Denmark)

    Koch-Ciobotaru, Cosmin; Isleifsson, Fridrik Rafn; Gehrke, Oliver

    2012-01-01

    This paper presents a model predictive controller developed in order to minimize the cost of grid energy consumption and maximize the amount of energy consumed from a local photovoltaic (PV) installation. The usage of as much locally produced renewable energy sources (RES) as possible, diminishes...... the effects of their large penetration in the distribution grid and reduces overloading the grid capacity, which is an increasing problem for the power system. The controller uses 24 hour prediction data for the ambient temperature, the solar irradiance, and for the PV output power. Simulation results...

  3. Systems Science in Support of Total Quality Management,

    Science.gov (United States)

    Quality Management (TQM). This paper bridges the gap between these two subjects to illustrate specific means by which systems science can begin to augment TQM. This construction is based upon the consideration of two topics. First, a brief introduction to systems science is provided. Second, systems science is applied through the concept of the Conant-Ashby

  4. Evolving Systems of Care with Total Clinical Outcomes Management

    Science.gov (United States)

    Lyons, John S.; Epstein, Richard A.; Jordan, Neil

    2010-01-01

    The current article proposes that further specification of the system of care concept is required. Based on the assertions that the system of care concept (a) refers to an ideal as opposed to an observable phenomenon, and (b) is engaged in offering transformational experiences, the authors propose that the system of care definition must be…

  5. Economic and environmental assessment of rooftops regarding suitability for photovoltaic systems installation based on remote sensing data

    International Nuclear Information System (INIS)

    Lukač, Niko; Seme, Sebastijan; Dežan, Katarina; Žalik, Borut; Štumberger, Gorazd

    2016-01-01

    Within the last few years, the increase of the world's energy consumption has substantially impacted the environment. Solar energy initiative is more than ever involved to tackle this issue, especially when deploying PV (photovoltaic) systems over large-scale residential areas. However, not all surfaces in these areas are economically suitable, while some surfaces have low CO_2 mitigation. With the availability of high-resolution remote sensing data, the estimation of suitable rooftops for PV systems installation can be performed automatically by estimating the PV potential. This paper presents a novel method for estimating NPV (net present value) of the potential PV systems installed on rooftops by using LiDAR (Light Detection And Ranging) data and PV systems' nonlinear efficiency characteristics. More importantly, the environmental impact is estimated for each rooftop through EPBT (energy payback time) and GGER (greenhouse gas emission rate), based on the life-cycle of a specific PV system. This is combined with NPV in order to find rooftops that are both economically and environmentally viable candidates for PV systems deployment. Results demonstrate a case study LiDAR data for predicting each building's economical and environmental impact, as well as providing an overall view of resulting cumulative CO_2 mitigation over large residential area. - Highlights: • The method relies on PV potential estimation over LiDAR remote sensing data. • Novel economic assessment of PV systems using remote sensing data is proposed. • Environmental analysis of PV systems based on EPBT and GGER is performed. • Estimation of CO_2 mitigation over LiDAR data by considering national energy network.

  6. 'Managing' the immune system with total lymphoid irradiation

    International Nuclear Information System (INIS)

    Strober, S.

    1981-01-01

    Total lymphoid irradiation (TLI), which in the past was limited to the treatment of malignant disease, is now emerging as a practical technique in the management of unwanted immune reactions in the areas of transplant tolerance and various autoimmune diseases. Current studies are particularly promising for application of TLI in rheumatoid arthritis and lupus nephritis

  7. Impact of organic Rankine cycle system installation on light duty vehicle considering both positive and negative aspects

    International Nuclear Information System (INIS)

    Usman, Muhammad; Imran, Muhammad; Yang, Youngmin; Park, Byung-Sik

    2016-01-01

    Highlights: • Positive and negative effects of waste heat recovery unit on vehicle were studied. • Organic Rankine cycle based power system for waste heat recovery. • Relationship of ORC unit weight and power was developed. • Impact of added weight, Part load operation and back pressure are presented. • Power enhancement of 5.82% of engine when positive & negative effects considered. - Abstract: This paper presents the analysis of organic Rankine cycle (ORC) based waste heat recovery system. Both the positive and negative effects of ORC system installation on a light duty vehicle were evaluated. Engine exhaust data for a light duty vehicle was used to design an ORC based system. Optimum cycle design suggests that ORC system installation is feasible. Results presented that for the vehicle operation at 100 km/h, engine power can be enhanced by 10.88% which is 5.92 kW of additional power and at the lower speed of 23.5 km/h, the engine power enhancement was 2.34%. ORC component weight data from manufacturers were used to estimate the weight of the designed system. The performance decline due to added weight is calculated. Effects of added back pressure and performance decline due to the part-load operation of ORC unit were also calculated and an overall effect of waste heat recovery system was evaluated. The results then suggested that maximum power enhancement is 5.82% at the vehicle speed of 100 km/h instead of previously mentioned 10.88% can be achieved if negative effects are also considered. Furthermore, it was concluded that at speeds lower than 48 km/h the waste heat recovery system was not beneficial at all and low-speed operation was in fact not preferable as it results in additional power demand from the engine by 6.39% at 23.5 km/h. The vehicles for city driving cycles are not recommended for ORC installation. Another finding revealed that if exhaust heat recovery heat exchanger is designed for maximum heat recovery, at part load operation, the

  8. First experiences from system integration, installation and commissioning of TELEPERM XS for reactor I and C at the Unterweser NPP

    International Nuclear Information System (INIS)

    Schoerner, O.

    1998-01-01

    The modernization of Reactor I and C, consisting of reactor limitation system, reactor control system and rod control system, at Unterweser NPP is the pilot application of the state-of-the-art safety I and C system TELEPERM XS. The Unterweser system has been integrated and tested from December 1996 to May 1997 in the Siemens Erlangen test field and has been installed at site in July 1997. For the period from July 1997 to Jul 1998 the new TELEPERM XS based Reactor I and C system will be operated online-open-loop in parallel to the existing system, in order to get information about the long term stability of the system and conduct intensive personnel training. For one selected function ''Power distribution control'' the operator has the possibility to choose between the old controller and the new TELEPERM XS function. During the 1998 outage the TELEPERM XS system will be connected to the process and the old I and C system will be dismantled. This document describes the experiences gathered during system integration in the test field. (author)

  9. Total energy supply-system for manned spaceship using nuclear reactor

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Honma, Yuji; Yoshida, Yutaka; Shimazu, Yoichiro

    2007-01-01

    In order to explore the deep space, such as Mars, Jupiter, Saturn, etc in the future, a spacecraft that will be driven by nuclear power should be developed. At present, satellites or space probes have been using mainly electric source of chemical battery, fuel battery, solar battery, and RI battery. However, considering highly developed and extensive space exploration in the future, it is obvious that larger electric power is required over the long term space travel more than several years. Additionally, the solar battery used in space will be fundamentally impossible to use in planetary exploration father away form Mars because sunlight is attenuated. Therefore, larger electric power source must be installed in the space craft. In this study, we consider about co-generation system for heat and electricity using nuclear power. We think that the nuclear power is appropriate for using in deep space because of a long time operation without refueling and possibility in downsizing due to higher power density. We selected the fast reactor system of about 18 MWth compared with other type of reactors, such as PWR and high temperature gas reactor (Honma, 2006). With regard to a power generation system, we examined about efficiency of Stirling engine compared with a gas-turbine engine. Theoretical efficiency of Stirling engine is much higher than that of gas-turbine engine. Therefore, we selected Stirling engine and we have started the model test of a Stirling engine. Total power generation at International Space Station (ISS) that has been built since 1998 is about 110kWe. We estimated that about 5 times as much electricity as that of ISS is enough to explore or developed the space. In that case, 2.5MWe will be generated by the system, number of crews will be about 10 and 2MW will be used to electric propulsion. (author)

  10. Assessment of total evacuation systems for tall buildings

    CERN Document Server

    Ronchi, Enrico

    2014-01-01

    This SpringerBrief focuses on the use of egress models to assess the optimal strategy for total evacuation in high-rise buildings. It investigates occupant relocation and evacuation strategies involving the exit stairs, elevators, sky bridges and combinations thereof. Chapters review existing information on this topic and describe case study simulations of a multi-component exit strategy. This review provides the architectural design, regulatory and research communities with a thorough understanding of the current and emerging evacuation procedures and possible future options. A model case study simulates seven possible strategies for the total evacuation of two identical twin towers linked with two sky-bridges at different heights. The authors present the layout of the building and the available egress components including both vertical and horizontal egress components, namely stairs, occupant evacuation elevators (OEEs), service elevators, transfer floors and sky-bridges. The evacuation strategies employ a ...

  11. Monitoring total mixed rations and feed delivery systems.

    Science.gov (United States)

    Oelberg, Thomas J; Stone, William

    2014-11-01

    This article is intended to give practitioners a method to evaluate total mixed ration (TMR) consistency and to give them practical solutions to improve TMR consistency that will improve cattle performance and health. Practitioners will learn how to manage the variation in moisture and nutrients that exists in haylage and corn silage piles and in bales of hay, and methods to reduce variation in the TMR mixing and delivery process. Copyright © 2014 Elsevier Inc. All rights reserved.

  12. Absolute total cross sections for noble gas systems

    International Nuclear Information System (INIS)

    Kam, P. van der.

    1981-01-01

    This thesis deals with experiments on the elastic scattering of Ar, Kr and Xe, using the molecular beam technique. The aim of this work was the measurement of the absolute value of the total cross section and the behaviour of the total cross section, Q, as function of the relative velocity g of the scattering partners. The author gives an extensive analysis of the glory structure in the total cross section and parametrizes the experimental results using a semiclassical model function. This allows a detailed comparison of the phase and amplitude of the predicted and measured glory undulations. He indicates how the depth and position of the potential well should be changed in order to come to an optimum description of the glory structure. With this model function he has also been able to separate the glory and attractive contribution to Q, and using the results from the extrapolation measurements he has obtained absolute values for Qsub(a). From these absolute values he has calculated the parameter C 6 that determines the strength of the attractive region of the potential. In two of the four investigated gas combinations the obtained values lie outside the theoretical bounds. (Auth.)

  13. Security Analysis of the Electronic Management System for a Total Site Utility System

    DEFF Research Database (Denmark)

    Manso Cortes, Oscar

    2016-01-01

    This paper presents the Security Analysis of the Electronic Management System (EMS) of a Total Site Utility System as proposed under the scope of the Efenis project. The Efenis project has been funded by the European Commission via the seventh framework programme (EC FP7) with the aim to improve ...

  14. Installation of a direct fired Lanham bread baking system. A demonstration at Family Loaf Bakery Ltd. (Bristol)

    Energy Technology Data Exchange (ETDEWEB)

    1985-10-01

    The first installation in the UK of a direct-fired continuous conveyor oven capable of producing 8,500 loaves/hour has reduced energy costs at Family Loaf Bakery's Avonmouth plant by pound 66,680/year and resulted in net cost savings to the company of pound 59,680/year. This saving was achieved by using a direct-fired oven which had a low thermal mass and small oven openings. When baking identical products, a 30% saving in oven fuel was obtained using the new system compared to conventional systems. For this bakery, it is expected to save over 12,000 GJ/year. The bread baking system was of USA development and initial teething problems adapting to the more dense UK bread have now been overcome. (U.K.).

  15. Model Development for Power System Analysis with a Substantial Wind Energy Capacity Installed in the Nordic grid

    DEFF Research Database (Denmark)

    Carlson, Ola; Perdana, Abram; Chen, Peiyuan

    2011-01-01

    The worldwide development of wind power installations now includes planning and construction of large-scale wind farms ranging in magnitudes of 1000 MW and more. As part of the planning and design of such systems, it is well established that the transient and dynamic stability of the electrical...... power system needs to be studied. Modelling work of the electrical behaviour of wind turbines and wind farms as well as model validation by measurements have been important parts of this project work. The models have been used to study dynamic phenomena during normal operation and fault occasions...... in the electric system. Fault Ride Through (FRT) measurements have been carried out on new wind parks connected to Estonian power grid and in all of them FRT tests were made. In several wind parks the tests were not successful and the tests will be repeated. In Finland measurements have carried out in 6 MW...

  16. James A. FitzPatrick Nuclear Power Plant recirculation pumps vibration system installation and performance since July 7, 1990

    International Nuclear Information System (INIS)

    Lefter, J.

    1992-01-01

    James A. FitzPatrick recirculation pumps are vertical units consisting of General Electric 5,300 hp variable speed motors driving Byron Jackson Pumps. Speed range is from 400 rpm at 20% reactor power to 1,480 rpm at 100% power. Full speed pump output is 42,500 gpm at 530 ft. head. This paper describes the vibration monitoring system. The design of this vibration monitoring system took about five months and was installed during plant refueling outage between February and May 1990. The objectives of this project were as follows: (1) document and assess the mechanical condition of each RRP during plant startup normal operation and shutdown; (2) identify any areas of operation that might be harmful to the unit; (3) perform impact testing of the proximity probe brackets to determine if any bracket resonances existed in the 0 to 20 times operating speed region (0 to 20X); (4) define and recommend Acceptance Regions in the TDM system

  17. Design of Photovoltaic System with Electric network shot installed at small factories for the production of construction materials at Maisi

    International Nuclear Information System (INIS)

    Parúas Cuza, Rafael

    2017-01-01

    The project was developed in the Mini-industry of local production of materials of the construction belonging to the community of Tip of Maisi, County Guantanamo, with the objective of allowing the energy self-sufficiency in a sustainable way starting from the installation from a Photovoltaic System of Injection to Net, as catalyst of these productions, contributing to the development of the renewable sources of form energy decentralized for the local development, and the conservation from the environment when diminishing the emissions of polluting gases. Leaving of the solar resource of this area, the photovoltaic system was designed so that the capacity of the system to settle the consumption outline maintained by the mini-industry (45 kWh / day), avoiding the unnecessary deliveries to the electric external net, and in that way to shorten the period of recovery of this technology. (author)

  18. AUTOMOTIVE DIESEL MAINTENACE 1. UNIT XV, I--MAINTAINING THE COOLING SYSTEM, CUMMINS DIESEL ENGINE, I--UNIT INSTALLATION--TRANSMISSION.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND THE PROCEDURES FOR TRANSMISSION INSTALLATION. TOPICS ARE (1) IMPORTANCE OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) EVALUATING COOLING SYSTEM FAILURES, (4) CARING FOR THE COOLING SYSTEM,…

  19. Item 01: Peculiarities during installation of forced filtered venting system, units 3 and 4 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Dinev, D.

    2005-01-01

    The Forced Filtered Venting System (FFV) is designated to minimize the uncontrolled and unfiltered release of activity to the environment due to untightness of the confinement in case of a severe accident. In this paper the flow diagram of FFV, Units 3 and 4 is shown and the main components of the system which are installed in RB, in Rooms A 031/2, A032/3, A031/4, at elevation 2.10 m are described. Calculation models of the pipelines of FFV were developed based on the requirements to the design and the input data, which were collected and analyzed. The graphic part of the model is presented at calculation schemes. The pipelines are checked according to the requirements of the ASME Code and the equations for calculation of the connected pipelines are stipulated in ASME NC-3650. The enclosed photos illustrate the most relevant positions of the modifications. In conclusion the positive aspects of the mounting experience for this unique installation are analyzed and the weak points are stated aiming at the improvement of the quality of preparation, organization and complete performance for similar facilities

  20. Solar energy system installed at the North Georgia APDC office building

    Science.gov (United States)

    1979-01-01

    A hydronic, automatic drain-down solar heating and cooling system is described. The system provides solar heat exchange from a 2,001 square foot effective collector area and supplies 65-70 percent of the building's cooling demand, 90-95 percent of the heating demand, and domestic hot water. The acceptance test plan and results, system operation and maintenance, and predicted system performance are presented.

  1. The installation and performance test of the surveillance system for DUPIC facility

    International Nuclear Information System (INIS)

    Kim, Dong Young; Kim, Ho Dong; Cha, Hong Ryul

    2000-07-01

    We have developed the real time surveillance system, named by DSSS, for DUPIC test facility. The system acquires data from He-3 neutron monitors(DSNM) and CCD cameras to automatically diagnose the transportation status of nuclear material. This technical report shortly illustrates important features of hardware and software of the system

  2. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ..., wiring, power supply, and data acquisition and recording system that are compatible with the output...) (0.5 inches of water column (in. w.c.)), whichever is greater. (2) Use a data recording system with a... integrity, oxidation, and galvanic corrosion. (f) For each bag leak detection system, you must meet the...

  3. The installation and performance test of the surveillance system for DUPIC facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Young; Kim, Ho Dong; Cha, Hong Ryul

    2000-07-01

    We have developed the real time surveillance system, named by DSSS, for DUPIC test facility. The system acquires data from He-3 neutron monitors(DSNM) and CCD cameras to automatically diagnose the transportation status of nuclear material. This technical report shortly illustrates important features of hardware and software of the system.

  4. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  5. total electron content derived from global positioning system during ...

    African Journals Online (AJOL)

    SULUNGU

    POSITIONING SYSTEM DURING SOLAR MAXIMUM OF 2012-2013. OVER THE ..... diffusion of the transported electrons from the equator (Panda et al. 2015). As the sun rises, the ..... Wang M and Christensen AB 2008 Features of annual and ...

  6. Total system for manufacture of nuclear vessels by computer: VECTRON

    International Nuclear Information System (INIS)

    Inagawa, Jin; Ueno, Osamu; Hanai, Yoshiharu; Ohkawa, Isao; Washizu, Hideyuki

    1980-01-01

    VECTRON (Vessel Engineering by Computer Tool and Rapid Operating for the N/C System) is a CAM (Computer Aided Manufacturing) system that has been developed to produce high quality and highly accurate vessels for nuclear power plants and other industrial plants. Outputs of this system are design drawings, manufacturing information and magnetic tapes of the N/C marking machine for vessel shell plates including their attachments. And it can also output information at each stage of designing, marking, cutting, forming and assembling by treating the vessels in three dimensions and by using data filing systems and plotting program for general use. The data filing systems consist of functional and manufacturing data of each part of vessels. This system not only realizes a change from manual work to computer work, but also leads us to improve production engineering and production jigs for safety and high quality. At present, VECTRON is being applied to the manufacture of the shell plates of primary containment vessels in the Kashiwazaki-Kariwa Nuclear Power Station Unit 1 (K-1) and the Fukushima Daini Nuclear Power Station Unit 3 (2F-3), to realize increased productivity. (author)

  7. Computer-controlled environmental test systems - Criteria for selection, installation, and maintenance.

    Science.gov (United States)

    Chapman, C. P.

    1972-01-01

    Applications for presently marketed, new computer-controlled environmental test systems are suggested. It is shown that capital costs of these systems follow an exponential cost function curve that levels out as additional applications are implemented. Some test laboratory organization changes are recommended in terms of new personnel requirements, and facility modification are considered in support of a computer-controlled test system. Software for computer-controlled test systems are discussed, and control loop speed constraints are defined for real-time control functions. Suitable input and output devices and memory storage device tradeoffs are also considered.

  8. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Barbose, Galen; Peterman, Carla

    2009-02-11

    As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

  9. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  10. Solar Heating and Cooling of Residential Buildings: Sizing, Installation and Operation of Systems.

    Science.gov (United States)

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    This training course and a companion course titled "Design of Systems for Solar Heating and Cooling of Residential Buildings," are designed to train home designers and builders in the fundamentals of solar hydronic and air systems for space heating and cooling and domestic hot water heating for residential buildings. Each course, organized in 22…

  11. Proposal of a national system to supervise nuclear installations out of international safeguards

    International Nuclear Information System (INIS)

    Rosa, L.P.

    1990-01-01

    It is proposed a national system to safeguard, supervise and inspect nuclear facilities in Brazil, apart from international safeguards. It discusses also the military nuclear activities and the uranium enrichment plants. The system should be controlled by Brazilian CNEN. (A.C.A.S.)

  12. Executing the double win: protect your cash flow during a patient accounting system install.

    Science.gov (United States)

    Adams, Jason L; Smith, J Cathy; Strand, Brett

    2009-09-01

    MultiCare Health System's plan for ensuring that its patient accounting system implementation would bring rapid financial benefits comprised eight basic steps: Set baselines and establish goals. Identify key leadership stakeholders across departmental lines. Identify team resources. Establish roles and responsibilities. Identify and prepare for potential risks. Develop guiding principles. Develop key reporting and monitoring tools. Conduct daily monitoring.

  13. Development and Testing of a Friction-Based Post-Installable Fiber-Optic Monitoring System for Subsea Applications

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating

  14. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  15. Solar heating system installed at Telex Communications, Inc. , Blue Earth, Minnesota. Final report

    Energy Technology Data Exchange (ETDEWEB)

    McEver, William S.

    1979-10-26

    The final results are summarized of a contract for space heating a 97,000 square foot building which houses administrative offices, assembly areas and warehouse space. Information is also provided on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature, and as-built drawings. The system began delivering space heating in February 1978. The Telex solar system is composed of four main subsystems; they are the solar collectors, controls, thermal storage and heat distribution. The ITC/Solar Mark III collector was used. The collector array consists of 10 rows of 36 collectors each. The control subsystem controls the operation of the system pumps and control valves. Thermal storage for the system is provided by a 20,000 gallon water storage tank located inside the building. Heating is accomplished by water-to-air heat exchangers and controlled by thermostats.

  16. Seveso II directive in prevention and mitigation of consequences of chemical terrorism, safety management systems in hazardous installations

    International Nuclear Information System (INIS)

    Klicek, M.

    2009-01-01

    Mayor accidents caused by hazardous substances are great threat to public. The consequences are often very severe with great number of injured people or even deaths and a great material damage. Statistic data shows that the main cause of accidents in hazardous installations is 'human factor', including the possibility of terrorist attack, or classic military operations. In order to ensure effective chemical safety, the actions should be taken by industry, public authorities, communities and other stake holders to prevent industrial accidents. Safety should be an integral part of the business activities of an enterprise, and all hazardous installations should strive to reach the ultimate goal of zero incidents. Safety management systems (SMS) should include appropriate technology and processes, as well as establishing an effective organisational structure. To mitigate consequences of accidents, emergency planning, land-use planning and risk communication is necessary. Adequate response in the event of accident should limit adverse consequences to health, environment and property. Follow-up actions are needed to learn from the accidents and other unexpected events, in order to reduce future incidents. In this paper the author will discus the implementing of SEVESO II directive in obtaining two main goals: major accident prevention and mitigation of consequences for men and environment in case of possible terrorist actions or military activities. Some Croatian experiences in implementing of UNEP APELL Programme, and its connection with SEVESO II directive will be shown.(author)

  17. Institutional applications of solar total energy systems. First quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    1977-07-01

    The meteorology followed to develop a data base for assessing market potential in the eight institutional subsectors is described. The subsectors are: elementary and high schools, colleges and universities, hospitals, military installations, public administration buildings, post offices, airports, and prisons. The market characteristics to be studied in detail are defined, and the methodology to be followed in assessing the relative economic performance of representative STE systems is given. The generic STE conceptual system design is introduced. (MHR)

  18. A computerized total-radiation management system for Shikoku Electric Power's Ikata nuclear-power plant

    International Nuclear Information System (INIS)

    Hirao, Toshiyuki; Sakakihara, Tetsuro; Tanabe, Shozo; Kano, Mamoru; Hoshi, Jun-ichi.

    1985-01-01

    This system allows on-line, real-time radiation management at nuclear-power plants. It increases management precision, decreases management workloads, and saves labor in operations that previously required specialized technicians to expend great amounts of time and effort on radiation management at facilities and their environments, environmental radiation evaluation, and control of radioactive waste. The article outlines the already installed system. (author)

  19. Establishment of quality assurance system for engineering construction of nuclear installations

    International Nuclear Information System (INIS)

    Jing Shilin; Wang Conglin

    2008-01-01

    Considering the tasks undertaken or to take by the organization, the principle to follow and applicable code for the establishment of quality assurance system shall defined, training of related leaders, directors and main staff on the codes shall carried out, its quality principle and objectives shall defined, and the activities to be completed or controlled and their relevancy and the difficulties in implementation and management shall be determined. Once the activities are defined, the organization to implement the activities shall be established and its responsibilities and interfaces shall defined, and its system documentation shall be developed and issued. During the operation of the system, it shall be evaluated, maintained and improved continuously. (authors)

  20. A system and approach for total pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd; Neidhardt, Dietmar [Tuboscope Pipeline Services, Houston, TX (United States); Gonzalez, Oscar [Tuboscope Mexico S.A. de C.V., Mexico, D.F. (Mexico)

    2005-07-01

    Pipeline rehabilitation and maintenance decisions are made using a wide variety of data, criteria, and expertise. The goal is to arrive at an optimal plan that considers risk and best return on Repair and Maintenance (R and M) expenditures for aging pipeline systems in both regulated and non-regulated environments. In order to achieve these goals, historical, operations, and assessment data is gathered, aligned and integrated as part of a baseline assessment. Integrity threats are identified based on operations and industry experience, and combined with potential consequences to public safety, the environment, and business to clearly delineate high risk exposure segments in the system. Integrity assessments are conducted in a prioritized manner, using the most appropriate technology and methods to address the threats. These include In Line Inspection technologies: MFL, Deformation, UT, INS (combinations thereof), Direct Assessment for EC and SCC threats, Hydro testing, and other indirect methods. From these results, decisions are made and R and M plans developed. To arrive at an optimal R and M plan, proper use of existing data, new integrity assessment data, and decision risk models is required. This paper presentation will detail the tactical aspect of an effective integrity management platform. Experience in decision support, operations priorities and execution of a rehabilitation plan using LinaView Pro{sup TM} integrity management system with risk-based integrity tools and maintenance planning will be presented. A process overview, results, and benefits will be given using these examples from operating oil and gas transmission pipelines. (author)

  1. Current state of total artificial heart therapy and introduction of the most important total artificial heart systems.

    Science.gov (United States)

    Spiliopoulos, Sotirios; Hergesell, Vera; Wasler, Andrae; Dapunt, Otto

    2018-06-14

    Due to the declining instances of organ donation, total artificial heart (TAH) therapy is of increasing importance for the management of end-stage biventricular heart failure. We introduce the currently most important established and novel TAH systems (SynCardia, CARMAT, ReinHeart, BiVACOR), report clinical outcomes and discuss technical requirements for the successful implementation of TAH therapy as an alternative to cardiac transplantation.

  2. Solar-system Education for the 2017 Total Solar Eclipse

    Science.gov (United States)

    Pasachoff, Jay M.

    2017-10-01

    I describe an extensive outreach program about the Sun, the silhouette of the Moon, and the circumstances both celestial and terrestrial of the August 21, 2017, total solar eclipse. Publications included a summary of the last decade of solar-eclipse research for Nature Astronomy, a Resource Letter on Observing Solar Eclipses for the American Journal of Physics, and book reviews for Nature and for Phi Beta Kappa's Key Reporter. Symposia arranged include sessions at AAS, APS, AGU, and AAAS. Lectures include all ages from pre-school through elementary school to high school to senior-citizen residences. The work, including the scientific research about the solar corona that is not part of this abstract, was supported by grants from the Solar Terrestrial Program of the Atmospheric and Geospace Sciences Division of NSF and from the Committee for Research and Exploration of the National Geographic Society. Additional student support was received from NSF, NASA's Massachusetts Space Grant Consortium, the Honorary Research Society Sigma Xi, the Clare Booth Luce Foundation, and funds at Williams College.

  3. Joint Navy and Air Force Infrared Sensor Stimulator (IRSS) Program for Installed Systems Test Facilities (ISTFs)

    National Research Council Canada - National Science Library

    Joyner, Tom

    1998-01-01

    ...) sensors undergoing integrated developmental and operational testing. IRSS generates digital IR scenes in real time to provide a realistic portrayal of IR scene radiance as viewed by and IR system under test in a threat engagement scenario...

  4. Solar heating and domestic hot water system installed at Kansas City, Fire Stations, Kansas City, Missouri

    Science.gov (United States)

    1980-01-01

    The solar system was designed to provide 47 percent of the space heating, 8,800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2,808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1,428 cubic feet of 0.5 inch diameter pebbles weighing 71.5 tons, a DHW preheat tank, blowers, pumps, heat exchangers, air ducting, controls and associated plumbing. Two 120 gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30 kilowatt electric unit heaters. There are six modes of system operation.

  5. Solar heating and domestic hot water system installed at Kansas City, Fire Stations, Kansas City, Missouri

    Science.gov (United States)

    1980-07-01

    The solar system was designed to provide 47 percent of the space heating, 8,800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2,808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1,428 cubic feet of 0.5 inch diameter pebbles weighing 71.5 tons, a DHW preheat tank, blowers, pumps, heat exchangers, air ducting, controls and associated plumbing. Two 120 gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30 kilowatt electric unit heaters. There are six modes of system operation.

  6. Using a Configuration System to Design Toilets and Place Installation Shafts

    DEFF Research Database (Denmark)

    Kudsk, Anders; Hvam, Lars; Thuesen, Christian Langhoff

    2013-01-01

    The aim of this research is to discover how configuration systems can support a product's design process when a high degree of variation is required and a very open or endless space exists for possible configurations. The article is based on an industrial case involving a firm that wishes to offer...... of opportunities exist for using configuration systems in the construction industry. They also show that it can be done without fundamentally changing the present process. © Kudsk et al.; Licensee Bentham Open....

  7. Development and test of the DAQ system for a Micromegas prototype installed into the ATLAS experiment

    CERN Document Server

    Zibell, Andre; The ATLAS collaboration; Bianco, Michele; Martoiu, Victor Sorin

    2015-01-01

    A Micromegas (MM) quadruplet prototype with an active area of 0.5 m$^2$ that adopts the general design foreseen for the upgrade of the innermost forward muon tracking systems (Small Wheels) of the ATLAS detector in 2018-2019, has been built at CERN and is going to be tested in the ATLAS cavern environment during the LHC RUN-II period 2015-2017. The integration of this prototype detector into the ATLAS data acquisition system using custom ATCA equipment is presented. An ATLAS compatible ReadOutDriver (ROD) based on the Scalable Readout System (SRS), the Scalable Readout Unit (SRU), will be used in order to transmit the data after generating valid event fragments to the high-level Read Out System (ROS). The SRU will be synchronized with the LHC bunch crossing clock (40.08 MHz) and will receive the Level-1 trigger signals from the Central Trigger Processor (CTP) through the TTCrx receiver ASIC. The configuration of the system will be driven directly from the ATLAS Run Control System. By using the ATLAS TDAQ Soft...

  8. Field Test and Performance Verification: Integrated Active Desiccant Rooftop Hybrid System Installed in a School - Final Report: Phase 4A

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, J

    2005-12-21

    This report summarizes the results of a field verification pilot site investigation that involved the installation of a hybrid integrated active desiccant/vapor-compression rooftop heating, ventilation, and air-conditioning (HVAC) unit at an elementary school in the Atlanta Georgia area. For years, the school had experienced serious humidity and indoor air quality (IAQ) problems that had resulted in occupant complaints and microbial (mold) remediation. The outdoor air louvers of the original HVAC units had been closed in an attempt to improve humidity control within the space. The existing vapor compression variable air volume system was replaced by the integrated active desiccant rooftop (IADR) system that was described in detail in an Oak Ridge National Laboratory (ORNL) report published in 2004 (Fischer and Sand 2004). The IADR system and all space conditions have been monitored remotely for more than a year. The hybrid system was able to maintain both the space temperature and humidity as desired while delivering the outdoor air ventilation rate required by American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 62. The performance level of the IADR unit and the overall system energy efficiency was measured and found to be very high. A comprehensive IAQ investigation was completed by the Georgia Tech Research Institute before and after the system retrofit. Before-and-after data resulting from this investigation confirmed a significant improvement in IAQ, humidity control, and occupant comfort. These observations were reported by building occupants and are echoed in a letter to ORNL from the school district energy manager. The IADR system was easily retrofitted in place of the original rooftop system using a custom curb adapter. All work was completed in-house by the school's maintenance staff over one weekend. A subsequent cost analysis completed for the school district by the design engineer of record concluded that the IADR

  9. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.H. [Duke Power Co., Seneca, SC (United States)

    1995-04-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT{trademark} Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS.

  10. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    International Nuclear Information System (INIS)

    Miller, M.H.

    1995-01-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT trademark Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS

  11. Solar heating and cooling system installed at RKL Controls Company, Lumberton, New Jersey. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-03-01

    Solar heating and cooling of a 40,000 square foot manufacturing building, sales offices and the solar computer control center/display room are described. Information on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature and as-built drawings are provided also. The solar system is composed of 6000 square feet of Sunworks double glazed flat plate collectors, external above ground storage subsystem, controls, ARKLA absorption chiller, heat recovery and a cooling tower.

  12. Solar heating and hot water system installed at Shoney's Restaurant, North Little Rock, Arkansas

    Science.gov (United States)

    1980-01-01

    A solar heating system designed to supply a major portion of the space and water heating requirements for a restaurant is described. The restaurant has a floor space of approximately 4,650 square feet and requires approximate 1500 gallons of hot water daily. The solar energy system consists of 1,428 square feet of Chamberlain flat plate liquid collector subsystem, and a 1500 gallon storage subsystem circulating hot water producing 321 x 10 to the 6th power Btu/Yr (specified) building heating and hot water heating.

  13. Influence of Potassium Installment (K on Melon Features Using System Tutoring in Sinop-Mt

    Directory of Open Access Journals (Sweden)

    João de Andrade Bonetti

    2011-06-01

    Full Text Available Potassium is an extremely important nutrient for the production of melon. To produce with quality is a necessity in today's market. The aim of this study was to evaluate the differences in productivity, length, diameter and oBrix content and acidity due to the fragmentation of fertilization. The research was developed in the city of Sinop-MT, in 2010. In the experience, randomized blocks (RBD with 2 treatments (DBC and 11 plots, totaling 22 repetitions, were used. Treatment (T1 consisted of the application of the total recommendation of potassium at planting (240 kg ha-¹. In treatment two (T2, 20% of the recommendation were applied at sowing, 20%, 30 days after sowing (DAS, 40%, 45 DAS and 20%, 60 DAS. Each plot consisted of 8 melon plants. 8 melons were harvested by repetition when they reached the point of physiological maturity. Productivity (kg-1, length and diameter (cm-1, sugar content and acidity were the parameters for evaluation. Data were subjected to analysis of variance and the obtained means were compared by Tukey test with p <(0.05. The analysis of variance showed significant results for treatment. Regarding the means, T1 was lower when compared to T2 °Brix values of 8.775 and 10.15 respectively differing among themselves. The same was true for the acidity, (T1 8,6 and T2 11.1. As for productivity, length and diameter there was no statistical difference. The results showed that potassium fertilizer management is important for obtaining high-quality melons.

  14. Acceptance testing report of Eductor System to be installed in the 105 K Basins

    International Nuclear Information System (INIS)

    Packer, M.J.

    1996-01-01

    The Spent Nuclear Fuel (SNF) Project Engineering Support group cold-tested the Eductor System a 15 horsepower multi-stage centrifugal pump manufactured by the Grunfos Corporation with the housing manufactured and sold with the pump by the Tri-Nuclear Corporation and a 3-inch diameter water jet eductor manufactured by the Fox Valve Corporation. The Eductor System was tested to gather and document information to optimize sludge retrieval operations for use in the 105 K Basins. The cold-testing took place during February 12 through February 29, 1996 in the 305 Cold Test Facility basin located in the 300 area. The pump, utilized in conjunction with the eductor, makes up the core of the Eductor System. The pumping unit consists of a 15 hp stainless steel multi-stage centrifugal Grunfos pump which is seated in a stainless steel fabricated housing. Two baskets or filter elements make up part of the housing on the suction side of the pump. The pump can be used independent of the housing but the housing has two identified purposes. The first use is to stabilize the centrifugal pump and give the pneumatic valves and pump discharge piping a solid platform so the Eductor System can be more easily mobilized within the basin as one unit. The second use for the housing presents the option to utilize the suction-side filters for capturing larger fuel pieces after the smaller fines have been removed

  15. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If a gas... requirements in paragraphs (a) and (d)(1)(i) through (iv) of this section. (i) Locate a flow sensor in a... closure mechanism must meet one of the requirements specified in paragraphs (b)(1)(i) through (iv) of this...

  16. An external irradiation treatment planning system installed on a personal computer. 137

    International Nuclear Information System (INIS)

    Kunieda, Etso; Ogawa, Koichi; Mita, Kazumasa; Sekiguchi, Kozo; Wada, Tadashi; Hashimoto, Shyozo

    1987-01-01

    A compact and practical treatment planning system for external photon therapy has been developed for use on a desk-top personal computer. The system calculates the dose distributions of inhomogeneous density fields by using the CT-value of each pixel and displays isodose curves on the CRT superimposed on the gray scale CT image or on a hard-copy. Inhomogeneity correction is based on the TAR method where the path length from the calculation point to the surface is determined by summing up electron density derived from the CT-values of pixels on the path. Wedge filter correction is also available by using stored geometric data. The contour of patients is acquired by tracting the CT image on the light panel of the digitizer, or directly from the digital CT data. Though some critical parts of the programs are written in machine language, the system is mostly in BASIC and C languages. The minimum required hardware consists of a MS-DOS based personal computer, a color CRT display, an 8 inch floppy disk drive and a digitizer. They are generally available in Japan at reasonable cost. Tests were carried out in homogeneous and inhomogeneous density phantoms to evaluate the accuracy of the acquired dosage, and showed reasonable results compared with other commercially available treatment planning systems. The overall calculation time is satisfactory for multiple beam calculations. 5 refs.; 3 figs

  17. New regulatory requirements of HVAC ventilation systems in nuclear installations Spanish

    International Nuclear Information System (INIS)

    Sierra, J. J.

    2011-01-01

    Ventilation systems serve a number of functions vital to the safe operation of nuclear facilities: the renewal of air, cooling components, prevent the release of contaminated air into the environment under both normal operating and accident, or ensure habitability of the control rooms in all situations.

  18. INVESTIGATION OF AMMONIA ADSORPTION ON FLY ASH DUE TO INSTALLATION OF SELECTIVE CATALYTIC REDUCTION SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    G.F. Brendel; J.E. Bonetti; R.F. Rathbone; R.N. Frey Jr.

    2000-11-01

    This report summarizes an investigation of the potential impacts associated with the utilization of selective catalytic reduction (SCR) systems at coal-fired power plants. The study was sponsored by the U.S. Department of Energy Emission Control By-Products Consortium, Dominion Generation, the University of Kentucky Center for Applied Energy Research and GAI Consultants, Inc. SCR systems are effective in reducing nitrogen oxides (NOx) emissions as required by the Clean Air Act (CAA) Amendments. However, there may be potential consequences associated with ammonia contamination of stack emissions and combustion by-products from these systems. Costs for air quality, landfill and pond environmental compliance may increase significantly and the marketability of ash may be seriously reduced, which, in turn, may also lead to increased disposal costs. The potential impacts to air, surface water, groundwater, ash disposal, ash utilization, health and safety, and environmental compliance can not be easily quantified based on the information presently available. The investigation included: (1) a review of information and data available from published and unpublished sources; (2) baseline ash characterization testing of ash samples produced from several central Appalachian high-volatile bituminous coals from plants that do not currently employ SCR systems in order to characterize the ash prior to ammonia exposure; (3) an investigation of ammonia release from fly ash, including leaching and thermal studies; and (4) an evaluation of the potential impacts on plant equipment, air quality, water quality, ash disposal operations, and ash marketing.

  19. Design and installation of a hot water layer system at the Tehran research reactor

    Directory of Open Access Journals (Sweden)

    Mirmohammadi Sayedeh Leila

    2013-01-01

    Full Text Available A hot water layer system (HWLS is a novel system for reducing radioactivity under research reactor containment. This system is particularly useful in pool-type research reactors or other light water reactors with an open pool surface. The main purpose of a HWLS is to provide more protection for operators and reactor personnel against undesired doses due to the radio- activity of the primary loop. This radioactivity originates mainly from the induced radioactivity contained within the cooling water or probable minute leaks of fuel elements. More importantly, the bothersome radioactivity is progressively proportional to reactor power and, thus, the HWLS is a partial solution for mitigating such problems when power upgrading is planned. Following a series of tests and checks for different parameters, a HWLS has been built and put into operation at the Tehran research reactor in 2009. It underwent a series of comprehensive tests for a period of 6 months. Within this time-frame, it was realized that the HWLS could provide a better protection for reactor personnel against prevailing radiation under containment. The system is especially suitable in cases of abnormality, e. g. the spread of fission products due to fuel failure, because it prevents the mixing of pollutants developed deep in the pool with the upper layer and thus mitigates widespread leakage of radioactivity.

  20. The physical protection systems at the Czech nuclear installations and the Y2K issue

    International Nuclear Information System (INIS)

    Malach, J.; Seifert, Z.; Sedlacek, J.; Bartak, L.; Polanka, J.

    1999-01-01

    The paper describes the joint effort of the State Office for Nuclear Safety, EZ, a.s., Nuclear Power Plant Dukovany and EBIS Ltd., as a subcontractor, to solve the problem of the Y2K particularly in connection with real time operation of the integrated physical protection system at Nuclear Power Plant Dukovany. (author)

  1. Modular Biopower System Providing Combined Heat and Power for DoD Installations

    Science.gov (United States)

    2013-12-01

    industry surged with new exploration and tertiary recovery techniques ( fracking and so forth). In the first quarter of 2012, we received permission to...itself on demand, with its hydraulically operated moving floor using system generated power. We required a bit less than two woodchip deliveries per

  2. Barriers to installing innovative energy systems in existing housing stock identified

    NARCIS (Netherlands)

    Hoppe, Thomas

    2013-01-01

    Several barriers to upgrading existing social housing with innovative energy systems (IES) have been identified by a study of eight large-scale renovation projects in the Netherlands. These include a lack of trust between stakeholders, opposition from tenants on grounds of increased costs or delays,

  3. Solar heating, cooling, and domestic hot water system installed at Kaw Valley State Bank and Trust Company, Topeka, Kansas

    Science.gov (United States)

    1980-01-01

    The building has approximately 5600 square feet of conditioned space. Solar energy was used for space heating, space cooling, and preheating domestic hot water (DHW). The solar energy system had an array of evacuated tube-type collectors with an area of 1068 square feet. A 50/50 solution of ethylene glycol and water was the transfer medium that delivered solar energy to a tube-in-shell heat exchanger that in turn delivered solar heated water to a 1100 gallon pressurized hot water storage tank. When solar energy was insufficient to satisfy the space heating and/or cooling demand, a natural gas-fired boiler provided auxiliary energy to the fan coil loops and/or the absorption chillers. Extracts from the site files, specification references, drawings, and installation, operation and maintenance instructions are presented.

  4. Installation of secure, always available wireless LAN systems as a component of the hospital communication infrastructure.

    Science.gov (United States)

    Hanada, Eisuke; Kudou, Takato; Tsumoto, Shusaku

    2013-06-01

    Wireless technologies as part of the data communication infrastructure of modern hospitals are being rapidly introduced. Even though there are concerns about problems associated with wireless communication security, the demand is remarkably large. In addition, insuring that the network is always available is important. Herein, we discuss security countermeasures and points to insure availability that must be taken to insure safe hospital/business use of wireless LAN systems, referring to the procedures introduced at Shimane University Hospital. Security countermeasures differ according to their purpose, such as for preventing illegal use or insuring availability, both of which are discussed. It is our hope that this information will assist others in their efforts to insure safe implementation of wireless LAN systems, especially in hospitals where they have the potential to greatly improve information sharing and patient safety.

  5. Evaluation of European District Heating Systems for Application to Army Installations in the United States

    Science.gov (United States)

    2006-07-01

    of the conurbation, the effectiveness of the investments as well as the plant’s management and the owner’s return requirements ( Energia 2004...37 p. Design Manual of ThermoNet Systems. 32 p. (In Finnish). ECONET Manual. 2005. Fläktwoods. Energia 2004. Energy year 2004. “District Heating...Pulliainen, K. 2005. Helsingin Energia . Oral source. Seppänen, O. 1995. ISBN 951-97233-1-5. Heating of Buildings. Publisher Suomen LVI- yhdistyken

  6. Power supply system for COMPASS tokamak re-installed at the IPP, Prague

    Czech Academy of Sciences Publication Activity Database

    Zajac, Jaromír; Pánek, Radomír; Žáček, František; Vlček, Jiří; Hron, Martin; Křivská, Alena; Hauptmann, R.; Daněk, M.; Šimek, J.; Prosek, J.

    2009-01-01

    Roč. 84, 7-11 (2009), s. 2020-2024 ISSN 0920-3796. [Symposium on Fusion Technology /25th./. Rostock, 15.09.2008-19.09.2008] Institutional research plan: CEZ:AV0Z20430508 Keywords : Compass * Power supply system * Flywheel-generator * Plasma start-up Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 1.122, year: 2009 http://dx.doi.org/10.1016/j.fusengdes.2008.11.092

  7. Application of systems analysis techniques to vulnerability studies of complex installations

    International Nuclear Information System (INIS)

    Bott, T.F.

    1986-01-01

    Application of reliability and risk analysis methods (particularly fault trees) to failure analysis of systems in hostile manmade environments is discussed. Methods for constructing, analyzing, and interpreting the fault trees, graphs, and diagrams are described. The application of fault-trees, directed graphs, and functional diagrams to problems in sabotage, survivability, and information protection is discussed in general terms. Special problems encountered in this type of analysis are discussed, and future research directions are considered

  8. System Engineering Analysis of Topside Cranes Installed on AD, AR, and AS Class Ships

    Science.gov (United States)

    1982-02-06

    4 severity CASREPs. Water or moisture in oumzs or motors accounted for five CASREPs; moisture in a transformer caused a class C fire , which resulted...Components of Bridge Cranes, Monorail Hoist Systems, and Side Port Hoists Associated Equipment: Accumulators Ladders Speed reducers Brakes Load blocks...Switches Bridge Locking devices *Tow bars Bumpers * Monorails Tracks Collector assembly Motors (electrical *Trolley buses Controller and hydraulic) *Trolleys

  9. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  10. Evaluating Carbonate System Algorithms in a Nearshore System: Does Total Alkalinity Matter?

    Science.gov (United States)

    Jones, Jonathan M; Sweet, Julia; Brzezinski, Mark A; McNair, Heather M; Passow, Uta

    2016-01-01

    Ocean acidification is a threat to many marine organisms, especially those that use calcium carbonate to form their shells and skeletons. The ability to accurately measure the carbonate system is the first step in characterizing the drivers behind this threat. Due to logistical realities, regular carbonate system sampling is not possible in many nearshore ocean habitats, particularly in remote, difficult-to-access locations. The ability to autonomously measure the carbonate system in situ relieves many of the logistical challenges; however, it is not always possible to measure the two required carbonate parameters autonomously. Observed relationships between sea surface salinity and total alkalinity can frequently provide a second carbonate parameter thus allowing for the calculation of the entire carbonate system. Here, we assessed the rigor of estimating total alkalinity from salinity at a depth sampling water from a pier in southern California for several carbonate system parameters. Carbonate system parameters based on measured values were compared with those based on estimated TA values. Total alkalinity was not predictable from salinity or from a combination of salinity and temperature at this site. However, dissolved inorganic carbon and the calcium carbonate saturation state of these nearshore surface waters could both be estimated within on average 5% of measured values using measured pH and salinity-derived or regionally averaged total alkalinity. Thus we find that the autonomous measurement of pH and salinity can be used to monitor trends in coastal changes in DIC and saturation state and be a useful method for high-frequency, long-term monitoring of ocean acidification.

  11. Meat Tempering Practices and Analyses of Meat Tempering Systems at Army Installations

    Science.gov (United States)

    1980-10-01

    that create the threat are controlled. One alternative to control the problem would be to eliminate deficiencies in the current system by improvements...raticle an rai se the reit(TM2 TK2 TES).eration cycle and raise the air temperature in the (TM2S TKV2 TE2S). cabinet, as required by frozen product load...horsepower than the standard M’s and K’s. They all use the E series units plus the added fans. The Specifications are: MODELS TK2 , TM2, TE2 TK3, TM3, TE3

  12. Control and protection system for an electron injector installed in a high-voltage terminal

    International Nuclear Information System (INIS)

    Martin, D.; Radu, A.; Baciu, G.; Grigore, D.

    1979-01-01

    The basic principles of operation of the control and protection system for an electron accelerator gun are described. The electron gun parameters are independently controlled by using four special secondary windings of the high-voltage transformer providing the accelerating voltage. Four groups of thyristor ac regulators employing phase control are connected so as to provide independent adjustment of each parameter of the gun. The power controller of modular construction has a single-phase supply from the 50 Hz 220 V mains. (orig.)

  13. Improvement program of state supervision system for radioactive and nuclear installations

    International Nuclear Information System (INIS)

    Cardenas, J.

    1993-01-01

    The current program begins as part of a policy to take care of the development of the cuban nuclear program and with the objective of improving the state supervision system of nuclear and radioactive facilities on the basis of the national experience, good skills internationally accepted and taking into account IAEA recommendations. The program develops the following topics: reorientation and restructure of state supervision, review of the current nuclear legislature, update of regulations of facility safety and qualification and training of state supervision personnel

  14. Systems comparison and potential of Solar Thermal installations in the mediterranean area

    International Nuclear Information System (INIS)

    Klaib, M.; Staib, F.; Winter, C.J.

    1993-01-01

    This study is an attempt to investigate, from a variety of starting points, the market potential for solar thermal power plants. The terms of reference chosen for the central systems parabolic trough and tower plants (30-200 MW e ) seem to be workable. For the decentral dish/Stirling systems (10 kW e -10 MW e ) a first estimation could be worked out. In addition to collecting data on a large number of parameters relevant to the energy economy, the study also concentrated on: evaluating Meteosat data in order to determine the insolation conditions for each 50 x 50 km square of land in the entire Mediterranean area; making a rough cartographic sketch showing the most significant surface-area related criteria for each country; deriving typical annual, weekly and daily load curves for central and decentral grids from a multitude of country-specific data, and comparing the electricity generating costs of solar thermal and conventional power plants. From this basic data, various potentials (theoretical, available, technical, economic and anticipated) were determined for solar thermal power plants

  15. First installation of a dual-room IVR-CT system in the emergency room.

    Science.gov (United States)

    Wada, Daiki; Nakamori, Yasushi; Kanayama, Shuji; Maruyama, Shuhei; Kawada, Masahiro; Iwamura, Hiromu; Hayakawa, Koichi; Saito, Fukuki; Kuwagata, Yasuyuki

    2018-03-05

    Computed tomography (CT) embedded in the emergency room has gained importance in the early diagnostic phase of trauma care. In 2011, we implemented a new trauma workflow concept with a sliding CT scanner system with interventional radiology features (IVR-CT) that allows CT examination and emergency therapeutic intervention without relocating the patient, which we call the Hybrid emergency room (Hybrid ER). In the Hybrid ER, all life-saving procedures, CT examination, damage control surgery, and transcatheter arterial embolisation can be performed on the same table. Although the trauma workflow realized in the Hybrid ER may improve mortality in severe trauma, the Hybrid ER can potentially affect the efficacy of other in/outpatient diagnostic workflow because one room is occupied by one severely injured patient undergoing both emergency trauma care and CT scanning for long periods. In July 2017, we implemented a new trauma workflow concept with a dual-room sliding CT scanner system with interventional radiology features (dual-room IVR-CT) to increase patient throughput. When we perform emergency surgery or interventional radiology for a severely injured or ill patient in the Hybrid ER, the sliding CT scanner moves to the adjacent CT suite, and we can perform CT scanning of another in/outpatient. We believe that dual-room IVR-CT can contribute to the improvement of both the survival of severely injured or ill patients and patient throughput.

  16. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  17. Effect of Multi-DG Installation to Loss Reduction in Distribution System

    Directory of Open Access Journals (Sweden)

    Nur Zahirah Mohd Ali

    2016-03-01

    Full Text Available Since last decade, Artificial Intelligence (AI methods have been used to solve complex DG problems because in most cases, they can provide global or near global solution. The major advantage of the AI methods is that they are relatively versatile for handling various qualitative constraints. AI methods mainly include Artificial Neural Network (ANN, Expert System (ES, Genetic Algorithm (GA, Evolutionary Programming (EP, Ant Colony Optimization (ACO and Particle Swarm Optimization (PSO. The purpose of this paper is to present a new technique, namely Adaptive Embedded Clonal Evolutionary Programming (AECEP. The objective of the study is to employ AECEP optimization techniques for loss minimization. This technique was developed to optimally determine the location and sizing of DG. The IEEE 41- Bus RTS was implemented for testing several cases in terms of loading conditions.

  18. Solar heating, cooling, and hot water systems installed at Richland, Washington

    Science.gov (United States)

    1979-01-01

    The project described is part of the U. S. Department of Energy's solar demonstration program, and became operational in April 1978. The solar system uses 6,000 square feet of flat-plate liquid collectors in a closed loop to deliver solar energy through a liquid-liquid heat exchanger to the building heat-pump duct work or 9,000-gallon thermal energy storage tank. A 25-ton Arkla solar-driven absorption chiller provides the cooling, in conjunction with a 2,000 gallon chilled water storage tank and reflective ponds on three sides of the building surplus heat. A near-by building is essentially identical except for having conventional heat-pump heating and cooling, and can serve as an experimental control. An on-going public relations program was provided from the beginning of the program, and resulted in numerous visitors and tour groups.

  19. Urban Air Pollution in Taiwan before and after the Installation of a Mass Rapid Transit System.

    Science.gov (United States)

    Ding, Pei-Hsiou; Wang, Gen-Shuh; Chen, Bing-Yu; Wan, Gwo-Hwa

    2016-09-01

    Urbanization causes air pollution in metropolitan areas, coupled with meteorological factors that affect air quality. Although previous studies focused on the relationships of urbanization, air pollution, and climate change in Western countries, this study evaluated long-term variations of air quality and meteorological factors in Taiwanese metropolitan areas (Taipei area, Taichung City, and Kaohsiung City) and a rural area (Hualien County) between 1993 and 2012. The influence of a mass rapid transit (MRT) system on air quality was also evaluated. Air pollutant concentrations and meteorology data were collected from Taiwan Environmental Protection Administration (TEPA) air monitoring stations and Central Weather Bureau stations in the surveyed areas, respectively. Analyses indicate that levels of air pollution in metropolitan areas were greater than in the rural area. Kaohsiung City had the highest levels of O, SO, and particulate matter 2.5 or 10 µm in diameter (PM and PM). Clear downward trends for CO, NO, PM, PM, and especially SO concentrations were found in the surveyed areas, whereas O showed no decrease. Both O and PM concentrations showed similar bimodal seasonal distributions. Taiwan's air quality has improved significantly since 1993, indicating the effectiveness of promoting air pollution strategies and policies by the TEPA. Air pollution had an obvious improvement in Taipei area after the MRT system began operations in 1996. Because global climate may potentially affect urban air pollution in Taiwan, further study to clarify the mechanisms by which air pollution may affect human health and other biological effects is warranted. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  20. Development of assessment system for tank earthquake-proof design (ASTEP code) installing automatic operation and knowledge database

    International Nuclear Information System (INIS)

    Maekawa, Akira; Suzuki, Michiaki; Fujii, Yuzo

    2004-01-01

    In a nuclear power station, seismic-proof design of the various tanks classified as auxiliary installation are required to follow technical guideline for the seismic-proof design of nuclear power station, which is called JEAC4601 for short in below. This guideline uses simple mechanical multi-mass model but a rather complicated evaluation method requires designers to have knowledge and experience and consumes both time and labor. On purpose to resolve those difficulties, Assessment System for Tank Earthquake-Proof Design, which is called ASTEP in short, has been developed and equipped with automated process and knowledge database. For this system, the targeted types of tank are a vertical cylindrical tank that has four supports or a skirt support, a horizontal cylindrical tank that has two saddle supports, and vertical cylindrical tank or water storage tank with a flat bottom. The system integrated all the seismic-proof design evaluation related tools and equipped with step by step menus in order of the flowchart, so enables designers to use them easily. In addition, it has a input aid that enables users to input with ease and a tool that automatically calculates input parameters. So this system reduces seismic-proof design evaluation related work load dramatically and also does not require much knowledge and experience related to this field. Further more, this system organized seismic-proof design related past statement and technical documents as a knowledge database so user could obtain the identical output as of the manual calculation results. Comparing output of ASTEP code and the manual calculation results of a typical tank that requires government approval of its design evaluation document, the error was within less than a percent so validity of the system was confirmed. This system has gained favorable comment during the trial run, and it was beyond our expectation. (author)

  1. A Mobile Remote Lab System to Monitor in Situ Thermal Solar Installations

    Directory of Open Access Journals (Sweden)

    Gastón Saez de Arregui

    2013-01-01

    Full Text Available In this paper we describe the design and development of interconnected devices which allow monitoring in situ the performance of solar boilers. This mobile remote lab system comprises two huge blocks of hardware: a mobile station located by the boiler, which is monitored and controlled in a remote way, and a fixed station, located in the Laboratory of Energy for the Sustained Development of the Universidad Nacional de Rosario. The communication between the fixed and mobile devices is controlled by microcontrollers included in both stations and programmed in C language. The project is being developed through three parallel lines of work: 1 Design and development of fixed and mobile hardware; 2 Development of firmware and software necessary to register and communicate data; 3 Design and development of learning activities. This mobile remote lab will be useful to test the behavior of solar boilers in the place and environmental conditions where they are placed so as to evaluate their performance and efficiency anywhere. This is also in order to contribute for the implementation of norms for the certification of solar boilers. On the other hand, the data and results obtained from the development will be used as supplies for the design of learning activities

  2. QUALITY IMPROVEMENT OF MANGOSTEEN FOR EXPORT THROUGH DRIP IRRIGATION SYSTEM AND YELLOW FLUORESCENT STICKY TRAP INSTALLATION

    Directory of Open Access Journals (Sweden)

    Affandi

    2011-10-01

    Full Text Available Mangosteen (Garcinia mangostana Linn. dubbed as “finest fruit of the world”, has potential for both domestic market and export. However, this potential is threatened by low fruit quality caused by production of yellow latex and fruit scarring. The research objective was to obtain technology to reduce yellow latex and control Scirtothrips dorsalis, a pest that causes scarring on mangosteen. A randomized block design with four treatments and 14 replications was used in this research. Significant differences among the treatments were calculated using the Honestly Significant Difference (HSD test. The results showed that treatment of drip irrigation system in combination with removing weeds under the canopy (A or removing weeds followed by minimum tillage under the canopy (B or removing weeds then covering with rice hay mulch under the canopy (C, where N, P, K, Ca, Mg fertilizer and yellow fluorescent sticky trap were applied could reduce scarring intensity and percentage of yellow latex on the fruit peel. However, the treatments did not significantly impact fruit diameter or percentage of yellow latex inside the fruit. Nevertheless, treatment C improved mangosteen quality by as much as 67.79% fulfilling export standard requirements.

  3. Electron beam deflection control system of a welding and surface modification installation

    Science.gov (United States)

    Koleva, E.; Dzharov, V.; Gerasimov, V.; Tsvetkov, K.; Mladenov, G.

    2018-03-01

    In the present work, we examined the patterns of the electron beam motion when controlling the transverse with respect to the axis of the beam homogeneous magnetic field created by the coils of the deflection system the electron gun. During electron beam processes, the beam motion is determined the process type (welding, surface modification, etc.), the technological mode, the design dimensions of the electron gun and the shape of the processed samples. The electron beam motion is defined by the cumulative action of two cosine-like control signals generated by a functional generator. The signal control is related to changing the amplitudes, frequencies and phases (phase differences) of the generated voltages. We realized the motion control by applying a graphical user interface developed by us and an Arduino Uno programmable microcontroller. The signals generated were calibrated using experimental data from the available functional generator. The free and precise motion on arbitrary trajectories determines the possible applications of an electron beam process to carrying out various scientific research tasks in material processing.

  4. Gamma ray NDA assay system for total plutonium and isotopics in plutonium product solutions

    International Nuclear Information System (INIS)

    Cowder, L.R.; Hsue, S.T.; Johnson, S.S.; Parker, J.L.; Russo, P.A.; Sprinkle, J.K.; Asakura, Y.; Fukuda, T.; Kondo, I.

    1979-01-01

    A LASL-designed gamma-ray NDA instrument for assay of total plutonium and isotopics of product solutions at Tokai-Mura is currently installed and operating. The instrument is, optimally, a densitometer that uses radioisotopic sources for total plutonium measurements at the K absorption edge. The measured transmissions of additional gamma-ray lines from the same radioisotopic sources are used to correct for self-attenuation of passive gamma rays from plutonium. The corrected passive data give the plutonium isotopic content of freshly separated to moderately aged solutions. This off-line instrument is fully automated under computer control, with the exception of sample positioning, and operates routinely in a mode designed for measurement control. A one-half percent precision in total plutonium concentration is achieved with a 15-minute measurement

  5. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring Systems

    Science.gov (United States)

    Bentley, Nicole; Brower, David; Le, Suy Q.; Seaman, Calvin; Tang, Henry

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  6. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring System

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  7. Application of geographic information system as a tool for environmental monitoring in support of a nuclear installation

    International Nuclear Information System (INIS)

    Ribeiro, Glaucielen F.; Silva, Nivaldo C.; Oliveira, Alexandre P.; Ferrari, Talita N.; Dias, Danila C.; Alberti, Heber Luiz C.

    2013-01-01

    The increasing advance of technologies of geographic information systems (GIS), computer processing techniques, and the growing volume of spatial data available and demand for automated systems to aid decision making are motivating enterprises and research institutions to make use of GIS technologies and Intelligent Computing. In this context, the Laboratory of Pocos de Caldas (LAPOC) has a large collection of data that are generated from environmental monitoring of a nuclear installation. These data can be organized through a georeferenced database in order to improve the quality of information, in addition to generating new interpretations from data and existing products. Therefore, this study aims to generate a database that is capable of gathering existing data into a Geographic Information System (GIS) platform using ArcGIS 9.3.1 software which has a model of relational database that stores geographic data in Geodatabase format. The steps of this process start with the organization of spatial and descriptive data, moving through logic and conceptual modeling and finally, implementation of the database into the GIS environment. The data modeling through the Geodatabase was adequate since its structure enabled the data work to be done in an efficient manner in addition to allowing centralized management of such data. This demonstrates the great potential of the tool and improvement of the quality and availability of information. (author)

  8. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  9. Design and installation of the MSE septum system in the new LSS4 extraction channel of the SPS

    CERN Document Server

    Balhan, B; Guinand, R; Luiz, F; Rizzo, A; Weterings, W; CERN. Geneva. AB Department

    2003-01-01

    For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS) facility, a new fast-extraction system has been installed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged aperture quadrupoles and extraction kicker magnets (MKE), six conventional DC septum magnets (MSE) are used. These magnets are mounted on a single mobile retractable support girder, which is motorised in order to optimise the local SPS aperture during setting up. The MSE septa are connected by a so-called plug-in system to a rigid water-cooled bus bar, which itself is powered by water-cooled cables. In order to avoid destruction of the septum magnet coils by direct impact of the extracted beam, a dilution element (TPSG) has been placed immediately upstream of the first septum coil. The whole system is kept at the required vacuum pressure by ion pumps attached to separate modules (MP). In this note we present the de...

  10. Evaluation of city buses installed diesel particulate filter systems on fleet test; Diesel particulate filter system wo tosaishita rosen bus no soko chosa

    Energy Technology Data Exchange (ETDEWEB)

    Sudo, H [Japan Automobile Research Institute Inc., Tsukuba (Japan)

    1997-10-01

    An environmental air quality of suspended particulate matter is insufficient in the big city area. To reduce the particulate matter, improvement of engine and development of the Diesel Particulate Filter (DPF) system are carrying. The purpose of this report is to investigate a possibility of practical use of the city buses installed DPF systems. From March 1995, investigation for practical use of these DPF systems on a route buses was carried in regular service operation of the Tokyo and Yokohama Transportation Bureau. The investigation items are service situation, smoke density and preparation inspection. From the result for 2 years service operation, each DPF systems needed some failure correspondence. but these were not fatal problem on using the DPF system. Then the subject of relative to durability and reliability became clear, and the performance of a low particulate emission DPF system obtained the high value evaluation for users. 9 refs., 4 figs., 2 tabs.

  11. Small-scale installations. Solar concentration system for architectural integration; Instalaciones de pequeno tamano. Sistema de concetracion solar para integracion arquitectonica

    Energy Technology Data Exchange (ETDEWEB)

    Chemisana, D.; Rosell, J.

    2010-07-01

    Concentration solar systems now practically limit its use in large installations with devices of considerable size, such as generator systems central tower parabolic trough concentrators for power generation. Disco-parabolic concentrators with Stirling engine or the great fans that support two-axis Fresnel lenses in combination with occasional multilayered cells with or without secondary concentrator. (Author) 11 refs.

  12. Calculation of a vacuum system of the installation for cleaning the surface of metal rolling by a cathode spot of a vacuum arc

    Science.gov (United States)

    Kuznetsov, V. G.; Kurbanov, T. A.; Kostrin, D. K.

    2017-07-01

    In this work are presented the installations for cleaning the surface of rolled products (wire and ribbon) from scale and technological lubricant with gateway systems of open type. The calculation of gateway devices and the optimal selection of pumping systems are shown.

  13. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  14. Java/JNI/C/Fortran based HSVD/HLSVD custom plugins for the jMRUI software system : Development, installation and usage

    NARCIS (Netherlands)

    De Beer, R.; Van Ormondt, D.

    2015-01-01

    This work was done in the context of FP7 - PEOPLE Marie Curie Initial Training Network Project PITN-GA-2012-316679-TRANSACT. This report describes the development, installation and usage of the HSVD and HLSVD plugin for the jMRUI software system. The latter system is maintained by the TRANSACT EU

  15. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  16. Elastic scattering and total reaction cross section for the {sup 6}He+{sup 58}Ni system

    Energy Technology Data Exchange (ETDEWEB)

    Morcelle, V. [Instituto de Física - Universidade Federal Fluminense, 24210-346, Rio de Janeiro, Brazil and Universidade Federal de Itajubá, 35900-030, Itabira (Brazil); Lichtenthäler, R.; Lépine-Szily, A.; Guimarães, V.; Gasques, L.; Scarduelli, V.; Condori, R. Pampa; Leistenschneider, E. [Depto de Física Nuclear, Universidade de São Paulo, C.P. 66318, 05389-970, São Paulo (Brazil); Mendes Jr, D. R.; Faria, P. N. de [Instituto de Física - Universidade Federal Fluminense, 24210-346, Rio de Janeiro (Brazil); Pires, K. C. C. [Universidade Tecnológica Federal do Paraná, 86300-000, Cornélio Procópio (Brazil); Barioni, A. [Instituto de Física, Universidade Federal da Bahia, 40210-340, Bahia (Brazil); Morais, M. C. [Centro Brasileiro de Pesquisas Físicas, 22290-180, Rio de Janeiro (Brazil); Shorto, J. M. B. [Instituto de Pesquisas Energéticas e Nucleares- IPEN, 05508-000, São Paulo (Brazil); Zamora, J. C. [Departament of Physics, Technische Universität Darmstadt (Germany)

    2014-11-11

    Elastic scattering measurements of {sup 6}He + {sup 58}Ni system have been performed at the laboratory energy of 21.7 MeV. The {sup 6}He secondary beam was produced by a transfer reaction {sup 9}Be ({sup 7}Li, {sup 6}He) and impinged on {sup 58}Ni and {sup 197}Au targets, using the Radioactive Ion Beam (RIB) facility, RIBRAS, installed in the Pelletron Laboratory of the Institute of Physics of the University of São Paulo, Brazil. The elastic angular distribution was obtained in the angular range from 15° to 80° in the center of mass frame. Optical model calculations have been performed using a hybrid potential to fit the experimental data. The total reaction cross section was derived.

  17. 21 CFR 862.1270 - Estrogens (total, in pregnancy) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Estrogens (total, in pregnancy) test system. 862.1270 Section 862.1270 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... Test Systems § 862.1270 Estrogens (total, in pregnancy) test system. (a) Identification. As estrogens...

  18. Malaria in Kakuma refugee camp, Turkana, Kenya: facilitation of Anopheles arabiensis vector populations by installed water distribution and catchment systems

    Directory of Open Access Journals (Sweden)

    Cetron Martin S

    2011-06-01

    Full Text Available Abstract Background Malaria is a major health concern for displaced persons occupying refugee camps in sub-Saharan Africa, yet there is little information on the incidence of infection and nature of transmission in these settings. Kakuma Refugee Camp, located in a dry area of north-western Kenya, has hosted ca. 60,000 to 90,000 refugees since 1992, primarily from Sudan and Somalia. The purpose of this study was to investigate malaria prevalence and attack rate and sources of Anopheles vectors in Kakuma refugee camp, in 2005-2006, after a malaria epidemic was observed by staff at camp clinics. Methods Malaria prevalence and attack rate was estimated from cases of fever presenting to camp clinics and the hospital in August 2005, using rapid diagnostic tests and microscopy of blood smears. Larval habitats of vectors were sampled and mapped. Houses were sampled for adult vectors using the pyrethrum knockdown spray method, and mapped. Vectors were identified to species level and their infection with Plasmodium falciparum determined. Results Prevalence of febrile illness with P. falciparum was highest among the 5 to 17 year olds (62.4% while malaria attack rate was highest among the two to 4 year olds (5.2/1,000/day. Infected individuals were spatially concentrated in three of the 11 residential zones of the camp. The indoor densities of Anopheles arabiensis, the sole malaria vector, were similar during the wet and dry seasons, but were distributed in an aggregated fashion and predominantly in the same zones where malaria attack rates were high. Larval habitats and larval populations were also concentrated in these zones. Larval habitats were man-made pits of water associated with tap-stands installed as the water delivery system to residents with year round availability in the camp. Three percent of A. arabiensis adult females were infected with P. falciparum sporozoites in the rainy season. Conclusions Malaria in Kakuma refugee camp was due mainly

  19. A Study on The Development of Local Exhaust Ventilation System (LEV’s) for Installation of Laser Cutting Machine

    Science.gov (United States)

    Harun, S. I.; Idris, S. R. A.; Tamar Jaya, N.

    2017-09-01

    Local exhaust ventilation (LEV) is an engineering system frequently used in the workplace to protect operators from hazardous substances. The objective of this project is design and fabricate the ventilation system as installation for chamber room of laser cutting machine and to stimulate the air flow inside chamber room of laser cutting machine with the ventilation system that designed. LEV’s fabricated with rated voltage D.C 10.8V and 1.5 ampere. Its capacity 600 ml, continuously use limit approximately 12-15 minute, overall length LEV’s fabricated is 966 mm with net weight 0.88 kg and maximum airflow is 1.3 meter cubic per minute. Stimulate the air flow inside chamber room of laser cutting machine with the ventilation system that designed and fabricated overall result get 2 main gas vapor which air and carbon dioxide. For air gas which experimented by using anemometer, general duct velocity that produce is same with other gas produce, carbon dioxide which 5 m/s until 10 m/s. Overall result for 5 m/s and 10 m/s as minimum and maximum duct velocity produce for both air and carbon dioxide. The air gas flow velocity that captured by LEV’s fabricated, 3.998 m/s average velocity captured from 5 m/s duct velocity which it efficiency of 79.960% and 7.667 m/s average velocity captured from 10 m/s duct velocity with efficiency of 76.665%. For carbon dioxide gas flow velocity that captured by LEV’s fabricated, 3.674 m/s average velocity captured from 5 m/s duct velocity which it efficiency of 73.480% and 8.255 m/s average velocity captured from 10 m/s duct velocity with efficiency of 82.545%.

  20. Thermosyphon Cooler Hybrid System for Water Savings in an Energy-Efficient HPC Data Center: Modeling and Installation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Carter, Thomas; Liu, Zan; Sickinger, David; Regimbal, Kevin; Martinez, David

    2017-02-01

    water on Sandia's site. In addition to describing the installation of the TSC and its integration into the ESIF, this paper focuses on the full heat rejection system simulation program used for hourly analysis of the energy and water consumption of the complete system under varying operating scenarios. A follow-up paper will detail the test results. The evaluation of the TSC's performance at NREL will also determine a path forward at Sandia for possible deployment in a large-scale system not only for data center use but also possibly site wide.

  1. Evaluating the Effect of a Mechanical Adjunct to Improve the Installation of Child Restraint Systems to Vehicles.

    Science.gov (United States)

    Mirman, Jessica H; Seifert, Sara J; Zonfrillo, Mark R; Metzger, Kristi; Durbin, Dennis R; Arbogast, Kristy B

    2015-01-01

    We explored if an alternative CRS design that utilized a mechanical adjunct to amplify the force applied to the adult seat belt (intervention CRS) results in more accurate and secure attachment between the CRS and the vehicle compared to similar CRS models that use LATCH or the existing adult seat belt. We conducted three separate studies to address this question and additionally explored: (1) the contribution of prior CRS installation experience (Study 1), (2) the value-added of CRS labeling (Study 2), and (3) paper-based vs. video instructions (Study 3). In Studies 1 and 2 we assessed a forward facing combination CRS design (intervention CRS) compared to a commercially available LATCH equipped model (control CRS) and in Study 3 we conducted a similar study using a convertible model of both the intervention and control CRS. Participants installed both CRS in a contemporary minivan and could choose which type of attachment to use for the control CRS (LATCH or seat belt); order of installation was counter-balanced. Evaluators systematically examined installations for accuracy and security. Study 1: A greater proportion of participants in both the experienced and inexperienced groups was able to securely install the intervention CRS compared to the control CRS: (45% vs. 16%, p =.0001 for experienced) and (37% vs. 6%, p =.003 for inexperienced). No differences between the CRS were observed for accuracy of installation in either user group. Study 2: A greater proportion of participants were able to securely install the enhanced intervention CRS compared to the control CRS: (62% vs. 9%, p =.001). The intervention CRS demonstrated reduced installation accuracy: (30% vs. 61%, p =.001). Study 3: A greater proportion of participants was able to securely install the intervention CRS compared to the control CRS: 79% vs. 66% p =.03, but this effect was smaller than in the previous studies. Participants were less likely to achieve an accurate installation with the intervention

  2. Evaluation of the Photovoltaic System Installation Impact to an Electric Power Grid Part 1: Simulation of photovoltaic generation by applying a meteorological model

    Directory of Open Access Journals (Sweden)

    Juan Ernesto Wyss Porras

    2015-12-01

    Full Text Available The impact of the installation of a large-scale photovoltaic (PV system to the electric power grid management is analyzed numerically in this series of works. In this part 1, the solar irradiance at the target country, Guatemala, is evaluated with a weather forecasting model, and PV energy potential is estimated. From the computed potential distribution, the appropriate area for installation of a large-scale PV system is selected. This area is where the solar irradiance is large and the energy consumption regions are close by. The optimal tilted angle of the PV panels is proposed as well from the PV output simulation. The time series data of the PV output is also evaluated in this part, and it will be applied to the analysis of the impact of the PV installation to the electric power grid management in the following part of this series of works.

  3. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  4. The challenge of installing a tsunami early warning system in the vicinity of the Sunda Arc, Indonesia

    Directory of Open Access Journals (Sweden)

    J. Lauterjung

    2010-04-01

    Full Text Available Indonesia is located along the most prominent active continental margin in the Indian Ocean, the so-called Sunda Arc and, therefore, is one of the most threatened regions of the world in terms of natural hazards such as earthquakes, volcanoes, and tsunamis. On 26 December 2004 the third largest earthquake ever instrumentally recorded (magnitude 9.3, Stein and Okal, 2005 occurred off-shore northern Sumatra and triggered a mega-tsunami affecting the whole Indian Ocean. Almost a quarter of a million people were killed, as the region was not prepared either in terms of early-warning or in terms of disaster response.

    In order to be able to provide, in future, a fast and reliable warning procedure for the population, Germany, immediately after the catastrophe, offered during the UN World Conference on Disaster Reduction in Kobe, Hyogo/Japan in January 2005 technical support for the development and installation of a tsunami early warning system for the Indian Ocean in addition to assistance in capacity building in particular for local communities. This offer was accepted by Indonesia but also by other countries like Sri Lanka, the Maldives and some East-African countries. Anyhow the main focus of our activities has been carried out in Indonesia as the main source of tsunami threat for the entire Indian Ocean. Challenging for the technical concept of this warning system are the extremely short warning times for Indonesia, due to its vicinity to the Sunda Arc. For this reason the German Indonesian Tsunami Early Warning System (GITEWS integrates different modern and new scientific monitoring technologies and analysis methods.

  5. Assessment of global solar radiation to examine the best locations to install a PV system in Tunisia

    Science.gov (United States)

    Belkilani, Kaouther; Ben Othman, Afef; Besbes, Mongi

    2018-02-01

    The study of the solar radiation is the starting point of any investigation for a new energy, to study and search the best location to install a PV system. A very important factor in the assessment of solar potential is the availability of data for global solar radiation that must be coherent and of high quality. In this paper, we analyze the estimation result of the monthly global solar radiation for three different locations, Bizerte in Northern Tunisia, Kairouan in Middle Eastern Tunisia, and Tozeur in Southern Tunisia, measured on the surface by the National Institute of Meteorology and the meteorological year irradiation based on satellite imagery result PVGIS radiation databases. To get the right measurements with minimum error, we propose a numerical model used to calculate the global solar radiation in the indicated three sites. The results show that the model can estimate the global solar radiation (kWh/m²) at a specific station and over most area of Tunisia. The model gives a good estimation for solar radiation where error between the measured values and those calculated are negligible.

  6. Standard Practice for Installation and Service of Solar Domestic Water Heating Systems for One- and Two-Family Dwellings

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1985-01-01

    1.1 This practice provides descriptions of solar domestic water heating systems and sets forth installation and service practices in new and existing one- and two-family dwellings to help ensure adequate operation and safety., 1.2 This practice applies regardless of the fraction of heating requirement supplied by solar energy, the type of conventional fuel used in conjunction with solar, or the heat transfer fluid (or fluids) used as the energy transport medium. However, where more stringent requirements are recommended by the manufacturer, these manufacturer requirements shall prevail. 1.3 The values stated in inch-pound units are to be regarded as the standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see Sections 6 and 7.

  7. Training Requirements and Training Delivery in the Total Army School System

    National Research Council Canada - National Science Library

    Winkler, John

    1999-01-01

    This report analyzes training requirements and school delivery of training in the Total Army School System, focusing on the system's ability to meet its training requirements in Reserve Component Training Institutions...

  8. Composite rotor blades for large wind energy installations

    Science.gov (United States)

    Kussmann, A.; Molly, J.; Muser, D.

    1980-01-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  9. Composite rotor blades for large wind energy installations

    Energy Technology Data Exchange (ETDEWEB)

    Kussmann, A; Molly, J P; Muser, D

    1979-06-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  10. Novel cemented cup-holding technique while performing total hip arthroplasty with navigation system

    OpenAIRE

    Hirokazu Takai, MD; Tomoki Takahashi, MD, PhD

    2017-01-01

    Recently, navigation systems have been more widely utilized in total hip arthroplasty. However, almost all of these systems have been developed for cementless cups. In the case of cemented total hip arthroplasty using a navigation system, a special-ordered cemented holder is needed. We propose a novel cemented cup-holding technique for navigation systems using readily available articles. We combine a cementless cup holder with an inverted cementless trial cup. The resulting apparatus is used ...

  11. Proposal of a system of signalling of security in occupational radiological protection for radiactives and nuclear installations

    International Nuclear Information System (INIS)

    Cambises, P.; Sanchez, A.; Almeida, C.

    2004-01-01

    After five years of implantation of a program for classification and signalling of restricted areas in the IPEN-CNEN-SP, we noticed that the applied measures of radio protection contributed for the improvement of the system of occupational radiological protection, promoting an improvement in the security of the workers, towards the planning in the execution of the activities involving the use of sources of ionizing radiation. Later, during the implantation of this program, the service of occupational radiological protection, there was great difficulty to conciliate its necessities in terms of security signalling, face the absence of existing standardisation in the country for the minimum disposals on the subject in question. Nowadays there are different interpretations of the specific criteria and many effective normative documents that exist in the country. This work presents as proposal the elaboration of a technical guide whose objective is to display the criteria and recommendations that can facilitate to the companies and the responsible ones for the safety to interpret and to apply the national laws and norms. As consequence, the specifics characteristics and the necessary disposals for the implantation for a implantation of a standardised system of signalling of security in the those areas, where labour risks for the workers involving the use of ionizing radiations are established, according to previous classification in terms of the national and international established recommendations. The noticeable aspects considered in the proposal of the technical guide try to attend to the criteria and recommendations presented in national and international laws and norms consulted and currently effective laws in our country, referring to the areas, places, ways of access, routes of circulation, and to danger carried through activities or to the proper installation of radiation sources, and theirs ways of protection. (Author)

  12. Study of Cycling Air-Cooling System with a Cold Accumulator for Micro Gas-Turbine Installations

    Science.gov (United States)

    Ochkov, V. F.; Stepanova, T. A.; Katenev, G. M.; Tumanovskii, V. A.; Borisova, P. N.

    2018-05-01

    Using the cycling air-cooling systems of the CTIC type (Combustion Turbine Inlet Cooling) with a cold accumulator in a micro gas-turbine installation (micro-GTI) to preserve its capacity under the seasonal temperature rise of outside air is described. Water ice is used as the body-storage in the accumulators, and ice water (water at 0.5-1.0°C) is used as the body that cools air. The ice water circulates between the accumulator and the air-water heat exchanger. The cold accumulator model with renewable ice resources is considered. The model contains the heat-exchanging tube lattice-evaporator covered with ice. The lattice is cross-flowed with water. The criterion heat exchange equation that describes the process in the cold accumulator under consideration is presented. The calculations of duration of its active operation were performed. The dependence of cold accumulator service life on water circulation rate was evaluated. The adequacy of the design model was confirmed experimentally in the mock-up of the cold accumulator with a refrigerating machine periodically creating a 200 kg ice reserve in the reservoir-storage. The design model makes it possible to determine the weight of ice reserve of the discharged cold accumulator for cooling the cycle air in the operation of a C-30 type micro- GTI produced by the Capstone Company or micro-GTIs of other capacities. Recommendations for increasing the working capacity of cold accumulators of CTIC-systems of a micro-GTI were made.

  13. Owner of a solar craftsman's establishment installs solar thermal power system on his own roof; Bekenntnis auf eigenem Dach. Solarthermie

    Energy Technology Data Exchange (ETDEWEB)

    Mertel, B. [WESTFA Westfaelische Apparatebau- und Vertriebs GmbH, Hagen (Germany)

    2008-09-15

    Tourism and solar water heating go together well, says Hermann Bachmaier, who owns a solar craftsman's business as well as a bed and breakfast place. On this building, he installed a model solar system from which both of his businesses profit. (orig.)

  14. Fiscal 1974 Sunshine Project result report. Research on solar energy utilization systems (total system); 1974 nendo taiyo energy riyo system chosa kenkyu seika hokokusho. Total system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-03-01

    The current most important solar energy utilization fields are solar energy power generation (solar heat and photovoltaic power generation), and solar heat cooling and heating. A solar heat power system collects or stores solar thermal energy as energy source of power systems, and converts it to electric power through heat exchange systems. To establish such system, not only R and D on a collector, absorption capsule, storage unit and heat transfer unit, but also complete study on an optimum system configuration and environmental impact are necessary. A photovoltaic power system converts solar energy to electric power directly by photoelectric conversion device such solar cell. Except specific local uses, drastic cost reduction and improvement of a conversion efficiency (at present 12-15%) and life (several years) are necessary for solar cells. Although a lot of solar heat cooling and heating systems is in practical use in Japan, for its further diffusion an important research task is development of heat collector excellent in efficiency, cost, life and maintainability. (NEDO)

  15. NOS module - reducing the nitrogen oxides and dust emissions of wood-fired systems; NOS-Modul. Installation und Test - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Salerno, B.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a project that examined the potential of reducing dust and nitrogen oxides emissions of biomass-fired systems. Two prototype installations are described with capacities of 70 - 300 kW and 150 - 500 kW, the latter being a mobile installation installed together with a silo in a container. The prototypes can burn problematical biomass such as cereals, chicken droppings, damp wood-chippings and straw. Various factors and configurations influencing the formation of emissions are examined. Cyclone technology, a catalyst using chrome-nickel shavings and a ceramic heat-exchanger are discussed. Measurements made are presented in tabular and graphical form and discussed.

  16. The construction of distant total distributed measuring and controlling system based on RS-232 communication

    International Nuclear Information System (INIS)

    Shi Chengying; Li Tiantuo; Zhu Wenkai; Zhang Quanhu

    1999-01-01

    The author discusses the construction of distant total distributed measuring and controlling system based on RS-232 communication. The merits of this system are simple construction, reliable performance, big communication distance, and wide covering range. The system fits in with application in radiation environment. The author also discusses the system's hardware equipment and communication protocol

  17. Orchestrating an Effective Formulation to Investigate the Impact of EMSs (Energy Management Systems for Residential Units Prior to Installation

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2017-03-01

    Full Text Available Demand Response (DR programs under the umbrella of Demand Side Management (DSM tend to involve end users in optimizing their Power Consumption (PC patterns and offer financial incentives to shift the load at “low-priced” hours. However, users have their own preferences of anticipating the amount of consumed electricity. While installing an Energy Management System (EMS, the user must be assured that this investment gives optimum comfort of bill savings, as well as appliance utility considering Time of Use (ToU. Moreover, there is a difference between desired load distribution and optimally-scheduled load across a 24-h time frame for lowering electricity bills. This difference in load usage timings, if it is beyond the tolerance level of a user, increases frustration. The comfort level is a highly variable phenomenon. An EMS giving optimum comfort to one user may not be able to provide the same level of satisfaction to another who has different preferences regarding electricity bill savings or appliance utility. Under such a diversity of human behaviors, it is difficult to select an EMS for an individual user. In this work, a numeric performance metric,“User Comfort Level (UCL”isformulatedonthebasisofuserpreferencesoncostsaving,toleranceindelayregardinguse of an appliance and return of investment. The proposed framework (UCL allows the user to select an EMS optimally that suits his.her preferences well by anticipating electricity bill reduction, tolerable delay in ToU of the appliance and return on investment. Furthermore, an extended literature analysis is conducted demonstrating generic strategies of EMSs. Five major building blocks are discussed and a comparative analysis is presented on the basis of the proposed performance metric.

  18. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  19. The photovoltaic power system of Geneva Palexpo Building 6; Installation photovoltaique sur la halle 6 de Geneva Palexpo

    Energy Technology Data Exchange (ETDEWEB)

    Keller, L.; Rhyner, R.

    2004-07-01

    A 70 kW photovoltaic installation has been constructed on the roof of the new Building 6 of Geneva Palexpo, a compound that hosts various conferences, exhibitions and sporting or other events, counting almost 1.5 million visitors a year, including the International Car Show, which alone attracts more than 700,000 visitors each year. The purpose of this installation is the indirect supply of recharging terminals for electric vehicles. The solar installation and the electric vehicle recharging terminals support an information campaign on solar energy and 'sustainable' mobility. For this purpose various explanatory signs have been placed inside the Geneva Palexpo halls and a promotional stand for renewable energy and 'sustainable' transport was placed inside the International Car Show 2003. This stand had some success: more than 4,000 people took part in the competition organised on this occasion. (author)

  20. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  1. Patterns identification in supervisory systems of nuclear reactors installations and gas pipelines systems using self-organizing maps

    International Nuclear Information System (INIS)

    Doraskevicius Junior, Waldemar

    2005-01-01

    Self-Organizing Maps, SOM, of Kohonen were studied, implemented and tested with the aim of developing, for the energy branch, an effective tool especially for transient identification in nuclear reactors and for gas pipelines networks logistic supervision, by classifying operations and identifying transients or abnormalities. The digital system for the test was developed in Java platform, for the portability and scalability, and for belonging to free development platforms. The system, executed in personal computers, showed satisfactory results to aid in decision taking, by classifying IRIS (International Reactor Innovative and Secure) reactor operation conditions (data from simulator) and by classifying Southeast (owner: TRANSPETRO - Brazil) gas pipeline network. Various adaptations were needed for such business, as new topologies for the output layer of artificial neural network and particular preparation for the input data. (author)

  2. Fiscal 1976 Sunshine Project result report. Research on solar energy utilization systems (total system); 1976 nendo taiyo energy riyo system chosa kenkyu seika hokokusho. Total system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-03-01

    For every solar energy utilization field, its background, feasibility, impact in practical use, and R and D policy in Japan were studied. Heating and hot water supply by solar energy are already practical because of less technical problems and reasonable profitability, and cooling is also practical as far as a technical viewpoint. At present, the technical level of solar heat power generation is in the stage of basic technology, however, in the future, development of economically reasonable systems will be demanded as well as establishment of its technology. The most difficult problem for realizing practical solar cell power generation systems is cost reduction. It is also another problem that a big demand of Si for solar cells further exceeds the current yield of Si in a semiconductor industry. A small-scale hybrid solar cell power generation system applicable to the roof of general residences is already feasible. Although a solar furnace is still poor in application to industrial fields, it is expected as the leading part for a future solar heat chemical industry. (NEDO)

  3. Predictive maintenance systems in continuous mine transport installations. Case study from Puentes mine. Sistemas de mantenimiento predictivo en instalaciones mineras de transporte continuo. Casa mina de Puentes

    Energy Technology Data Exchange (ETDEWEB)

    Arechaga Rodriguez, F; Roda Vazquez, C [ENDESA, Madrid (Spain)

    1988-01-01

    At some complex mining installations it is necessary to complement the corrective and preventive maintenance with new systems that enable the detection of failures before they become evident and cause a breakdown. These systems, called predictive maintenance, use several techniques, such as: vibration control, lubricant analysis, wear control, etc. This kind of maintenance provides good results, and although it is not expensive, it requires qualified personnel and good organisation.

  4. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    Energy Technology Data Exchange (ETDEWEB)

    Doyle, C. [IBTS and Dividend Solar, Austin, TX (United States). Dividend Solar; Truitt, A. [Acuity Power Group, Denver, CO (United States); Inda, D. [Clean Power Finance, San Francisco, CA (United States); Lawrence, R. [North American Board of Certified Energy Practitioners, Clifton Park, NY (United States); Lockhart, R. [Acuity Power Group, Wellesley Hills, MA (United States); Golden, M. [Efficiency.org and IBTS, Sausalito, CA (United States)

    2015-03-01

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

  5. Optimization of stand-alone photovoltaic systems with hydrogen storage for total energy self-sufficiency

    Energy Technology Data Exchange (ETDEWEB)

    Lund, P D [Helsinki Univ. of Technology, Espoo (Finland). Dept. of Technical Physics

    1991-01-01

    A new method for optimization of stand-alone photovoltaic-hydrogen energy systems is presented. The methodology gives the optimum values for the solar array and hydrogen storage size for any given system configuration and geographical site. Sensitivity analyses have been performed to study the effect of subsystem efficiencies on the total system performance and sizing, and also to identify possibilities for further improvements. Optimum system configurations have also been derived. The results indicate that a solar-hydrogen energy system is a very promising potential alternative for low power applications requiring a total electricity self-sufficiency. (Author).

  6. Novel cemented cup-holding technique while performing total hip arthroplasty with navigation system.

    Science.gov (United States)

    Takai, Hirokazu; Takahashi, Tomoki

    2017-09-01

    Recently, navigation systems have been more widely utilized in total hip arthroplasty. However, almost all of these systems have been developed for cementless cups. In the case of cemented total hip arthroplasty using a navigation system, a special-ordered cemented holder is needed. We propose a novel cemented cup-holding technique for navigation systems using readily available articles. We combine a cementless cup holder with an inverted cementless trial cup. The resulting apparatus is used as a cemented cup holder. The upside-down cup-holding technique is useful and permits cemented cup users to utilize a navigation system for placement of the acetabular component.

  7. Novel cemented cup-holding technique while performing total hip arthroplasty with navigation system

    Directory of Open Access Journals (Sweden)

    Hirokazu Takai, MD

    2017-09-01

    Full Text Available Recently, navigation systems have been more widely utilized in total hip arthroplasty. However, almost all of these systems have been developed for cementless cups. In the case of cemented total hip arthroplasty using a navigation system, a special-ordered cemented holder is needed. We propose a novel cemented cup-holding technique for navigation systems using readily available articles. We combine a cementless cup holder with an inverted cementless trial cup. The resulting apparatus is used as a cemented cup holder. The upside-down cup-holding technique is useful and permits cemented cup users to utilize a navigation system for placement of the acetabular component.

  8. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... direction indicator must be installed in each bypass line or air makeup supply line that could divert the... via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform visual inspections of... accuracy of at least 0.5 inches of water column or 5 percent of the measured value, whichever is larger...

  9. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  10. Comparative cost analyses: total flow vs other power conversion systems for the Salton Sea Geothermal Resource

    Energy Technology Data Exchange (ETDEWEB)

    Wright, G.W.

    1978-09-18

    Cost studies were done for Total Flow, double flash, and multistage flash binary systems for electric Energy production from the Salton Sea Geothermal Resource. The purpose was to provide the Department of energy's Division of Geothermal Energy with information by which to judge whether to continue development of the Total Flow system. Results indicate that the Total Flow and double flash systems have capital costs of $1,135 and $1,026 /kW with energy costs of 40.9 and 39.7 mills/kW h respectively. The Total Flow and double flash systems are not distinguishable on a cost basis alone; the multistage flash binary system, with capital cost of $1,343 /kW and energy cost of 46.9 mills/kW h, is significantly more expensive. If oil savings are considered in the total analysis, the Total Flow system could save 30% more oil than the double flash system, $3.5 billion at 1978 oil prices.

  11. Do illness rating systems predict discharge location, length of stay, and cost after total hip arthroplasty?

    Directory of Open Access Journals (Sweden)

    Sarah E. Rudasill, BA

    2018-06-01

    Conclusions: These findings suggest that although ASA classifications predict discharge location and SOI scores predict length of stay and total costs, other factors beyond illness rating systems remain stronger predictors of discharge for THA patients.

  12. Study of installation of PV systems at campus; Campus ni okeru taiyoko hatsuden donyu ni kansuru kenkyu (taiyo denchi nomi wo secchishita baai no yobi kento)

    Energy Technology Data Exchange (ETDEWEB)

    Tsuboi, N.; Tanaka, H.; Okumiya, M. [Nagoya University, Nagoya (Japan)

    1997-11-25

    In terms of energy consumption, environmentality and economical efficiency in the case of installing the photovoltaic power system on the rooftop of the university campus, a comparative study was conducted with other power generation systems. As objects to be comparatively studied, selected were the all-electric type centralized space heating/cooling system, cogeneration system, nighttime heat storage system and centralized system with solar cells installed. The panel area of the PV system is 10,000m{sup 2} on the rooftop and 7,000{sup 2} on the outer wall. About data on solar radiation, average values obtained in Nagoya were used. Assessment was made in terms of energy consumption amount at the time of operation, system COP, emission amounts of CO2, NOx and SOx at the time of manufacturing and operation, initial cost, running cost, etc. As a result of the study, an effect of reducing global warming gas was admitted in the PV system. However, the initial cost of the solar cell panel was high, and the life cycle cost of the PV system was lower than other systems. 1 ref., 7 figs., 3 tabs.

  13. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  14. Determining roof surfaces suitable for the installation of PV (photovoltaic) systems, based on LiDAR (Light Detection And Ranging) data, pyranometer measurements, and distribution network configuration

    International Nuclear Information System (INIS)

    Srećković, Nevena; Lukač, Niko; Žalik, Borut; Štumberger, Gorazd

    2016-01-01

    Proliferation of distributed generation units, integrated within the distribution network requires increased attention to their proper placements. In urban areas, buildings' rooftops are expected to have greater involvement in the deployment of PV (photovoltaic) systems. This paper proposes a novel procedure for determining roof surfaces suitable for their installation. The PV potential of roof surfaces is assessed based on Light Detection And Ranging (LiDAR) data and pyranometer measurements. Then, the time-dependent PV generation profiles, electricity distribution network configuration, and time-dependent loading profiles are used together over time-steps for selecting those roof surfaces with the highest PV potential, which would lead to the highest reduction of network losses per year. The presented procedure was implemented within a real urban area distribution network. The results obtained confirmed that PV potential assessment could be an insufficient criterion when selecting those roof surfaces suitable for the installation of PV systems. In order to obtain relevant results, network configuration and time-dependent loading and generation profiles must be considered as well. - Highlights: • Roof surfaces, suitable for installation of PV systems are evaluated and ranked. • Improved PV potential based procedure is proposed for their selection in urban areas. • Time-dependent network loading and PV generation profiles are considered. • Losses in a real electricity network are minimized in the optimization procedure. • Final selection of ranked roof surfaces is based on results of optimization.

  15. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  16. Multiple trigger scintillators were installed: big ones covering the total surface of the sensor and several smaller ones. The former give a trigger for each beam particle. The latter are used to select a part of the sensor surface for efficiency measurements.

    CERN Multimedia

    Nooren, G.

    2004-01-01

    Multiple trigger scintillators were installed: big ones covering the total surface of the sensor and several smaller ones. The former give a trigger for each beam particle. The latter are used to select a part of the sensor surface for efficiency measurements.

  17. Grain-A Java data analysis system for Total Data Readout

    International Nuclear Information System (INIS)

    Rahkila, P.

    2008-01-01

    Grain is a data analysis system developed to be used with the novel Total Data Readout data acquisition system. In Total Data Readout all the electronics channels are read out asynchronously in singles mode and each data item is timestamped. Event building and analysis has to be done entirely in the software post-processing the data stream. A flexible and efficient event parser and the accompanying software system have been written entirely in Java. The design and implementation of the software are discussed along with experiences gained in running real-life experiments

  18. Design and simulation of a totally digital image system for medical image applications

    International Nuclear Information System (INIS)

    Archwamety, C.

    1987-01-01

    The Totally Digital Imaging System (TDIS) is based on system requirements information from the Radiology Department, University of Arizona Health Science Center. This dissertation presents the design of this complex system, the TDIS specification, the system performance requirements, and the evaluation of the system using the computer-simulation programs. Discrete-event simulation models were developed for the TDIS subsystems, including an image network, imaging equipment, storage migration algorithm, data base archive system, and a control and management network. The simulation system uses empirical data generation and retrieval rates measured at the University Medical Center hospital. The entire TDIS system was simulated in Simscript II.5 using a VAX 8600 computer system. Simulation results show the fiber-optical-image network to be suitable; however, the optical-disk-storage system represents a performance bottleneck

  19. Hybrid fuel cell/diesel generation total energy system, part 2

    Science.gov (United States)

    Blazek, C. F.

    1982-11-01

    Meeting the Goldstone Deep Space Communications Complex (DGSCC) electrical and thermal requirements with the existing system was compared with using fuel cells. Fuel cell technology selection was based on a 1985 time frame for installation. The most cost-effective fuel feedstock for fuel cell application was identified. Fuels considered included diesel oil, natural gas, methanol and coal. These fuel feedstocks were considered not only on the cost and efficiency of the fuel conversion process, but also on complexity and integration of the fuel processor on system operation and thermal energy availability. After a review of fuel processor technology, catalytic steam reformer technology was selected based on the ease of integration and the economics of hydrogen production. The phosphoric acid fuel cell was selected for application at the GDSCC due to its commercial readiness for near term application. Fuel cell systems were analyzed for both natural gas and methanol feedstock. The subsequent economic analysis indicated that a natural gas fueled system was the most cost effective of the cases analyzed.

  20. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  1. Radiologic total lung capacity measurement. Development and evaluation of a computer-based system

    Energy Technology Data Exchange (ETDEWEB)

    Seeley, G.W.; Mazzeo, J.; Borgstrom, M.; Hunter, T.B.; Newell, J.D.; Bjelland, J.C.

    1986-11-01

    The development of a computer-based radiologic total lung capacity (TLC) measurement system designed to be used by non-physician personnel is detailed. Four operators tested the reliability and validity of the system by measuring inspiratory PA and lateral pediatric chest radiographs with a Graf spark pen interfaced to a DEC VAX 11/780 computer. First results suggest that the ultimate goal of developing an accurate and easy to use TLC measurement system for non-physician personnel is attainable.

  2. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  3. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant

  4. Total robotic radical rectal resection with da Vinci Xi system: single docking, single phase technique.

    Science.gov (United States)

    Tamhankar, Anup Sunil; Jatal, Sudhir; Saklani, Avanish

    2016-12-01

    This study aims to assess the advantages of Da Vinci Xi system in rectal cancer surgery. It also assesses the initial oncological outcomes after rectal resection with this system from a tertiary cancer center in India. Robotic rectal surgery has distinct advantages over laparoscopy. Total robotic resection is increasing following the evolution of hybrid technology. The latest Da Vinci Xi system (Intuitive Surgical, Sunnyvale, USA) is enabled with newer features to make total robotic resection possible with single docking and single phase. Thirty-six patients underwent total robotic resection in a single phase and single docking. We used newer port positions in a straight line. Median distance from the anal verge was 4.5 cm. Median robotic docking time and robotic procedure time were 9 and 280 min, respectively. Median blood loss was 100 mL. One patient needed conversion to an open approach due to advanced disease. Circumferential resection margin and longitudinal resection margins were uninvolved in all other patients. Median lymph node yield was 10. Median post-operative stay was 7 days. There were no intra-operative adverse events. The latest Da Vinci Xi system has made total robotic rectal surgery feasible in single docking and single phase. With the new system, four arm total robotic rectal surgery may replace the hybrid technique of laparoscopic and robotic surgery for rectal malignancies. The learning curve for the new system appears to be shorter than anticipated. Early perioperative and oncological outcomes of total robotic rectal surgery with the new system are promising. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  5. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  6. Small-displacement sensing system based on multiple total internal reflections in heterodyne interferometry.

    Science.gov (United States)

    Wang, Shinn-Fwu; Chiu, Ming-Hung; Chen, Wei-Wu; Kao, Fu-Hsi; Chang, Rong-Seng

    2009-05-01

    A small-displacement sensing system based on multiple total internal reflections in heterodyne interferometry is proposed. In this paper, a small displacement can be obtained only by measuring the variation in phase difference between s- and p-polarization states for the total internal reflection effect. In order to improve the sensitivity, we increase the number of total internal reflections by using a parallelogram prism. The theoretical resolution of the method is better than 0.417 nm. The method has some merits, e.g., high resolution, high sensitivity, and real-time measurement. Also, its feasibility is demonstrated.

  7. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  8. Employee Engagement Is Vital for the Successful Selection of a Total Laboratory Automation System.

    Science.gov (United States)

    Yu, Hoi-Ying E; Wilkerson, Myra L

    2017-11-08

    To concretely outline a process for selecting a total laboratory automation system that connects clinical chemistry, hematology, and coagulation analyzers and to serve as a reference for other laboratories. In Phase I, a committee including the laboratory's directors and technologists conducted a review of 5 systems based on formal request for information process, site visits, and vendor presentations. We developed evaluation criteria and selected the 2 highest performing systems. In Phase II, we executed a detailed comparison of the 2 vendors based on cost, instrument layout, workflow design, and future potential. In addition to selecting a laboratory automation system, we used the process to ensure employee engagement in preparation for implementation. Selecting a total laboratory automation system is a complicated process. This paper provides practical guide in how a thorough selection process can be done with participation of key stakeholders. © American Society for Clinical Pathology, 2017. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  9. Institutional applications of solar total-energy systems. Draft final report. Volume 2. Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-07-01

    The appendices present the analytical basis for the analysis of solar total energy (STE) systems. A regional-climate model and a building-load requirements model are developed, along with fuel-price scenarios. Life-cycle costs are compared for conventional-utility, total energy, and STE systems. Thermal STE system design trade-offs are performed and thermal STE system performance is determined. The sensitivity of STE competitiveness to fuel prices is examined. The selection of the photovoltaic array is briefly discussed. The institutional-sector decision processes are analyzed. Hypothetical regional back-up rates and electrical-energy costs are calculated. The algorithms and equations used in operating the market model are given, and a general methodology is developed for projecting the size of the market for STE systems and applied to each of 8 institutional subsectors. (LEW)

  10. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain repository

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, J.E.; Lee, J.H.; Lingineni, S.; Mishra, S; McNeish, J.A.; Sassani, D.C.; Sevougian, S.D.

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation`s commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives of the US NRC and the US EPA. The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). Total system performance assessments require the explicit quantification of the relevant processes and process interactions. In addition assessments are useful to help define the most significant processes, the information gaps and uncertainties and therefore the additional information required for more robust and defensible assessment of the overall performance. The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993.

  11. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Atkins, J.E.; Lee, J.H.; Lingineni, S.; Mishra, S.; McNeish, J.A.; Sassani, D.C.; Sevougian, S.D.

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation's commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives of the US NRC and the US EPA. The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). Total system performance assessments require the explicit quantification of the relevant processes and process interactions. In addition assessments are useful to help define the most significant processes, the information gaps and uncertainties and therefore the additional information required for more robust and defensible assessment of the overall performance. The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993

  12. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k d ) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone

  13. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k{sub d}) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone.

  14. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1989-05-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 -- a fee levied on electricity generated in commercial nuclear power plants -- is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee and is consistent with the program strategy and plans contained in the DOE's Draft 1988 Mission Plan Amendment. The total-system cost for the system with a repository at Yucca Mountain, Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $24 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $31 to $33 billion, depending on the quantity of spent fuel to be disposed of. The $7 billion cost savings for the single-repository system in comparison with the two-repository system is due to the elimination of $3 billion for second-repository development and $7 billion for the second-repository facility. These savings are offset by $2 billion in additional costs at the first repository and $1 billion in combined higher costs for the MRS facility and transportation. 55 refs., 2 figs., 24 tabs

  15. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  16. A decision-making framework for total ownership cost management of complex systems: A Delphi study

    Science.gov (United States)

    King, Russel J.

    This qualitative study, using a modified Delphi method, was conducted to develop a decision-making framework for the total ownership cost management of complex systems in the aerospace industry. The primary focus of total ownership cost is to look beyond the purchase price when evaluating complex system life cycle alternatives. A thorough literature review and the opinions of a group of qualified experts resulted in a compilation of total ownership cost best practices, cost drivers, key performance factors, applicable assessment methods, practitioner credentials and potential barriers to effective implementation. The expert panel provided responses to the study questions using a 5-point Likert-type scale. Data were analyzed and provided to the panel members for review and discussion with the intent to achieve group consensus. As a result of the study, the experts agreed that a total ownership cost analysis should (a) be as simple as possible using historical data; (b) establish cost targets, metrics, and penalties early in the program; (c) monitor the targets throughout the product lifecycle and revise them as applicable historical data becomes available; and (d) directly link total ownership cost elements with other success factors during program development. The resultant study framework provides the business leader with incentives and methods to develop and implement strategies for controlling and reducing total ownership cost over the entire product life cycle when balancing cost, schedule, and performance decisions.

  17. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  18. The development of an information system and installation of an Internet web database for the purposes of the occupational health and safety management system.

    Science.gov (United States)

    Mavrikakis, I; Mantas, J; Diomidous, M

    2007-01-01

    This paper is based on the research on the possible structure of an information system for the purposes of occupational health and safety management. We initiated a questionnaire in order to find the possible interest on the part of potential users in the subject of occupational health and safety. The depiction of the potential interest is vital both for the software analysis cycle and development according to previous models. The evaluation of the results tends to create pilot applications among different enterprises. Documentation and process improvements ascertained quality of services, operational support, occupational health and safety advice are the basics of the above applications. Communication and codified information among intersted parts is the other target of the survey regarding health issues. Computer networks can offer such services. The network will consist of certain nodes responsible to inform executives on Occupational Health and Safety. A web database has been installed for inserting and searching documents. The submission of files to a server and the answers to questionnaires through the web help the experts to perform their activities. Based on the requirements of enterprises we have constructed a web file server. We submit files so that users can retrieve the files which they need. The access is limited to authorized users. Digital watermarks authenticate and protect digital objects.

  19. Total Measurement Uncertainty for the Plutonium Finishing Plant (PFP) Segmented Gamma Scan Assay System

    CERN Document Server

    Fazzari, D M

    2001-01-01

    This report presents the results of an evaluation of the Total Measurement Uncertainty (TMU) for the Canberra manufactured Segmented Gamma Scanner Assay System (SGSAS) as employed at the Hanford Plutonium Finishing Plant (PFP). In this document, TMU embodies the combined uncertainties due to all of the individual random and systematic sources of measurement uncertainty. It includes uncertainties arising from corrections and factors applied to the analysis of transuranic waste to compensate for inhomogeneities and interferences from the waste matrix and radioactive components. These include uncertainty components for any assumptions contained in the calibration of the system or computation of the data. Uncertainties are propagated at 1 sigma. The final total measurement uncertainty value is reported at the 95% confidence level. The SGSAS is a gamma assay system that is used to assay plutonium and uranium waste. The SGSAS system can be used in a stand-alone mode to perform the NDA characterization of a containe...

  20. Personnel protective equipment total-encapsulating suit decontamination study using shower systems

    International Nuclear Information System (INIS)

    Menkhaus, D.E.

    1991-01-01

    This report documents an experimental evaluation, conducted at the Idaho National Engineering Laboratory, of a shower-based decontamination station for personnel wearing a Level A, total- encapsulating, chemical-protective suit. The decontamination station is used by personnel when egressing a dry, dusty environment contaminated with transuranic radionuclides. This system has the potential to minimize the risk of spreading the contaminants to clean areas. Two types of shower systems were evaluated, a drench shower and a multi-nozzle shower. A total-encapsulating suit, worn by personnel. was contaminated with soil containing 239 Pu. Pre- shower and post-shower contamination samples were collected and visual observations were made to evaluate the ability of the shower system to remove the contaminated dust and to obtain baseline data useful in designing a shower-based personnel decontamination system. 12 figs., 7 tabs