  1. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  2. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  3. Evaluation of construction cost of pyro-partitioning plant

    International Nuclear Information System (INIS)

    Kinoshita, Kensuke; Kurata, Masateru; Inoue, Tadashi

    1999-01-01

    This study was conducted to evaluate the construction cost of a pyro-partitioning plant. The plant capacity was chosen to accommodate processing of the HLLW generated by PUREX reprocessing of 800 ton of spent LWR fuel. The block flow diagram and mass balance obtained from our previous experimental data were used to produce a detailed process-flow diagram and to design the plant. In this evaluation, the plant was estimated to cover an area of about 90 m x 70 m, and to cost $576 million for construction. This study shows that the cost of process equipments, such as reaction vessels, accountability tanks and so on, is just about 13% of total construction cost. On the other hand, the cost of process robots and the equipments for key measurement point (KMP) is major part in the cost of in-cell equipment. So it is clear that the construction cost can be reduced by reducing the number of material balance area (MBA) and KMP. (author)

  4. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  5. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  6. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  7. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  8. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  9. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  10. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  11. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  12. CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST.

    OpenAIRE

    Trinca, RB; Perles, CE; Volpe, PLO

    2009-01-01

    CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST The high cost of sensitivity commercial calorimeters may represent an obstacle for many calorimetric research groups. This work describes (fie construction and calibration of a batch differential heat conduction calorimeter with sample cells volumes of about 400 mu L. The calorimeter was built using two small high sensibility square Peltier thermoelectric sensors and the total cost was estimated to be about...

  13. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  14. CONSTRUCTION COST PREDICTION USING NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Smita K Magdum

    2017-10-01

    Full Text Available Construction cost prediction is important for construction firms to compete and grow in the industry. Accurate construction cost prediction in the early stage of project is important for project feasibility studies and successful completion. There are many factors that affect the cost prediction. This paper presents construction cost prediction as multiple regression model with cost of six materials as independent variables. The objective of this paper is to develop neural networks and multilayer perceptron based model for construction cost prediction. Different models of NN and MLP are developed with varying hidden layer size and hidden nodes. Four artificial neural network models and twelve multilayer perceptron models are compared. MLP and NN give better results than statistical regression method. As compared to NN, MLP works better on training dataset but fails on testing dataset. Five activation functions are tested to identify suitable function for the problem. ‘elu' transfer function gives better results than other transfer function.

  15. Cost effectiveness of DH-network construction. Final report; Kaukolaempoeverkon rakentamisen kehittaeminen; Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kivistoe, V.M. [Ekono Energy Ltd, Espoo (Finland)

    1993-12-31

    Construction cost of DH networks were analyzed in the study. Basing on the analysis, those areas of construction activities were selected, where cost effectiveness could be improved. According to the study, the civil works` cost form about half of the total construction cost on small diameter networks and 30..40 % of the cost of larger sizes. The impact of the design on the construction cost should be emphasized. According to the study it is possible to find significant reduction in the construction cost by increased use of twin pipe where the both carrier pipes are included in the same insulation casing. In small network sizes the reduction of cost achievable by the above is about 30..35 % and in larger sizes about 10 % (DN 125..DN 200) when comparing with a design by individual pipes. The use of twin pipe also causes savings in thermal loss. In sizes DN 65 and up, the saving in heat loss is about 90..95 FIM/m which represents about half of the total savings when compared with design by individual pipes. The possibility of prestressing the twin pipe element at factory in order to shorten the installation time at site was also studied and test pipes was also done. By factory prestressing it would be possible to avoid preheating of pipes at construction site. The trench could be backfilled immediately after pipe laying, welding and inspections. Theoretically and based on test pipes done the prestressing of twin pipe element looks very promising. When factory prestressing would be used, the open time of the trench is reduced significantly and for instance the disturbance to traffic is smaller. As well the use of labour and machinery at site could be more effective

  16. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  17. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  18. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  19. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  20. Residential construction cost: An Italian survey

    Directory of Open Access Journals (Sweden)

    Rubina Canesi

    2017-04-01

    Full Text Available This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy. The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  1. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  2. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  3. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  4. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  5. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  6. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  7. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  8. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... will not only reduce the stress on estimators but also enhance the accuracy of cost estimates. The resulting 11 ... cost estimating process to work together to ..... construction estimators in Hong. Kong. Construction Management.

  9. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  10. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  11. Cost per case or total cost? The potential of prevention of hand injuries in young children – Retrospective and prospective studies

    Directory of Open Access Journals (Sweden)

    Carlsson Katarina

    2008-07-01

    Full Text Available Abstract Background Health-care costs for hand and forearm injuries in young children are poorly documented. We examined costs in 533 children injured years 1996–2003. Methods Health-care costs and costs for lost productivity were retrospectively calculated in children from three catchment areas in Sweden. Seven case categories corresponding to alternative prevention strategies were constructed. Results Over time, diminishing number of ward days reduced the health-care cost per case. Among children, the cost of lost productivity due to parental leave was 14 percent of total cost. Fingertip injuries had low median costs but high total costs due to their frequency. Complex injuries by machine or rifle had high costs per case, and despite a low number of cases, total cost was high. Type of injury, surgery and physiotherapy sessions were associated with variations in health-care cost. Low age and ethnic background had a significant effect on number of ward days. Conclusion The costs per hand injury for children were lower compared to adults due to both lower health-care costs and to the fact that parents had comparatively short periods of absence from work. Frequent simple fingertip injuries and rare complex injuries induce high costs for society. Such costs should be related to costs for prevention of these injuries.

  12. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  13. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  14. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  15. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  16. Theoretical framework of the causes of construction time and cost overruns

    Science.gov (United States)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  17. Fast-track, low-cost construction starts with the owner

    International Nuclear Information System (INIS)

    Smock, R.

    1992-01-01

    As we approach the threshold of a new round of ordering of base load generating capacity after a 15-year hiatus, power pant owners are taking a long, hard look at construction. The last round of base load construction was plagued with construction cost overruns and delays. Billions of dollars in cost overruns, many attributable to construction delays, were not allowed to be placed in utilities' rate bases. Those problems will not be tolerated in the next round. During the past few years the construction climate has changed. Non-utility power producers have demonstrated and ability to build small power plants-including many steam plants burning solid fuels-quickly and at surprisingly low costs. In this paper the cost-plus approach traditionally taken by more utilities, who will lead in the base-load construction phase, is being seriously questioned

  18. Total Cost of Ownership and Cost-to-Serve

    DEFF Research Database (Denmark)

    Zachariassen, Frederik

    2007-01-01

    Artiklen reviewer den eksisterende litteratur vedrørende økonomistyringsværktøjerne Total Cost of Ownership (TCO) og Cost-to-Serve (CtS). Herefter kortlægges det, hvordan TCO og CtS bidrager til en identificering af direkte omkostninger såvel som indirekte omkostninger henholdsvis up-stream og down...

  19. Construction cost forecast model : model documentation and technical notes.

    Science.gov (United States)

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  20. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  1. Total generating costs: coal and nuclear plants

    International Nuclear Information System (INIS)

    1979-02-01

    The study was confined to single and multi-unit coal- and nuclear-fueled electric-generating stations. The stations are composed of 1200-MWe PWRs; 1200-MWe BWRs; 800-and 1200-MWe High-Sulfur Coal units, and 800- and 1200-MWe Low-Sulfur Coal units. The total generating cost estimates were developed for commercial operation dates of 1985 and 1990; for 5 and 8% escalation rates, for 10 and 12% discount rates; and, for capacity factors of 50, 60, 70, and 80%. The report describes the methodology for obtaining annualized capital costs, levelized coal and nuclear fuel costs, levelized operation and maintenance costs, and the resulting total generating costs for each type of station. The costs are applicable to a hypothetical Middletwon site in the Northeastern United States. Plant descriptions with general design parameters are included. The report also reprints for convenience, summaries of capital cost by account type developed in the previous commercial electric-power cost studies. Appropriate references are given for additional detailed information. Sufficient detail is given to allow the reader to develop total generating costs for other cases or conditions

  2. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  3. Cost-identification analysis of total laryngectomy: an itemized approach to hospital costs.

    Science.gov (United States)

    Dedhia, Raj C; Smith, Kenneth J; Weissfeld, Joel L; Saul, Melissa I; Lee, Steve C; Myers, Eugene N; Johnson, Jonas T

    2011-02-01

    To understand the contribution of intraoperative and postoperative hospital costs to total hospital costs, examine the costs associated with specific hospital services in the postoperative period, and recognize the impact of patient factors on hospital costs. Case series with chart review. Large tertiary care teaching hospital system. Using the Pittsburgh Head and Neck Organ-Specific Database, 119 patients were identified as having total laryngectomy with bilateral selective neck dissection and primary closure from 1999 to 2009. Cost data were obtained for 112 patients. Costs include fixed and variable costs, adjusted to 2010 US dollars using the Consumer Price Index. Mean total hospital costs were $29,563 (range, $10,915 to $120,345). Operating room costs averaged 24% of total hospital costs, whereas room charges, respiratory therapy, laboratory, pharmacy, and radiology accounted for 38%, 14%, 8%, 7%, and 3%, respectively. Median length of stay was 9 days (range, 6-43), and median Charlson comorbidity index score was 8 (2-16). Patients with ≥1 day in the intensive care unit had significantly higher hospital costs ($46,831 vs $24,601, P cost differences with stratification based on previous radiation therapy ($27,598 vs $29,915 with no prior radiation, P = .62) or hospital readmission within 30 days ($29,483 vs $29,609 without readmission, P = .97). This is one of few studies in surgery and the first in otolaryngology to analyze hospital costs for a relatively standardized procedure. Further work will include cost analysis from multiple centers with investigation of global cost drivers.

  4. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  5. Analysis of Trends in Housing Construction Cost in Nigeria from ...

    African Journals Online (AJOL)

    The upward trends in housing construction costs have been a major issue in the economy as a whole. The research uses typical 3 - bedroom bungalow in Lagos to analyze the trends in housing construction cost from 2000 to 2009. The basic question for this research is whether the inflation in housing construction costs ...

  6. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  7. Belowground advantages in construction cost facilitate a cryptic plant invasion.

    Science.gov (United States)

    Caplan, Joshua S; Wheaton, Christine N; Mozdzer, Thomas J

    2014-04-30

    The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. Published by Oxford University Press on behalf of the Annals of Botany Company.

  8. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  9. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  10. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  11. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  12. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  13. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  14. Reverse-total shoulder arthroplasty cost-effectiveness: A quality-adjusted life years comparison with total hip arthroplasty.

    Science.gov (United States)

    Bachman, Daniel; Nyland, John; Krupp, Ryan

    2016-02-18

    To compare reverse-total shoulder arthroplasty (RSA) cost-effectiveness with total hip arthroplasty cost-effectiveness. This study used a stochastic model and decision-making algorithm to compare the cost-effectiveness of RSA and total hip arthroplasty. Fifteen patients underwent pre-operative, and 3, 6, and 12 mo post-operative clinical examinations and Short Form-36 Health Survey completion. Short form-36 Health Survey subscale scores were converted to EuroQual Group Five Dimension Health Outcome scores and compared with historical data from age-matched patients who had undergone total hip arthroplasty. Quality-adjusted life year (QALY) improvements based on life expectancies were calculated. The cost/QALY was $3900 for total hip arthroplasty and $11100 for RSA. After adjusting the model to only include shoulder-specific physical function subscale items, the RSA QALY improved to 2.8 years, and its cost/QALY decreased to $8100. Based on industry accepted standards, cost/QALY estimates supported both RSA and total hip arthroplasty cost-effectiveness. Although total hip arthroplasty remains the quality of life improvement "gold standard" among arthroplasty procedures, cost/QALY estimates identified in this study support the growing use of RSA to improve patient quality of life.

  15. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  16. Total medical costs of treating femoral neck fracture patients with hemi- or total hip arthroplasty: a cost analysis of a multicenter prospective study

    NARCIS (Netherlands)

    P.T.P.W. Burgers (Paul); M. Hoogendoorn (Martine); E.A.C. Van Woensel; R.W. Poolman (Rudolf); M. Bhandari (Mohit); P. Patka (Peter); E.M.M. van Lieshout (Esther)

    2016-01-01

    textabstractSummary: The aim of this study was to determine the total medical costs for treating displaced femoral neck fractures with hemi- or total hip arthroplasty in fit elderly patients. The mean total costs per patient at 2 years of follow-up were €26,399. These results contribute to cost

  17. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  18. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  19. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  20. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  1. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... It can be argued that design to target cost may also provide a frame for developing the supply chain towards better coordination and collaboration. Thus methods of design to target cost may serve to facilitate the development of a more integrated supply chain....

  2. Construction engineering inspection direct cost survey.

    Science.gov (United States)

    2014-07-01

    The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...

  3. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: executive summary

    International Nuclear Information System (INIS)

    1985-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's Civilian Radioactive Waste Management Progrram is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report is an input into the third evaluation of the adequacy of the fee. The total-system cost for the reference waste-management program in this analysis is estimated to be 24 to 30 billion (1984) dollars. For the sensitivity cases studied in this report, the costs could be as high as 35 billion dollars and as low as 21 billion dollars. Because factors like repository location, the quantity of waste generated, transportation-cask technology, and repository startup dates exert substantial impacts on total-system costs, there are several tradeoffs between these factors, and these tradeoffs can greatly influence the total cost of the program. The total-system cost for the reference program described in this report is higher by 3 to 5 billion dollars, or 15 to 20%, than the cost for the reference program of the TSLCC analysis of April 1984. More than two-thirds of this increase is in the cost of repository construction and operation. These repository costs have increased because of changing design concepts, different assumptions about the effort required to perform the necessary activities, and a change in the source data on which the earlier analysis was based. Development and evaluation costs have similarly increased because of a net addition to the work content. Transportation costs have increased because of different assumptions about repository locations and several characteristics of the transportation system. It is expected that the estimates of total-system costs will continue to change in response to both an evolving program strategy and better definition of the work required to achieve the program objectives

  4. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  5. Economics of human performance and systems total ownership cost.

    Science.gov (United States)

    Onkham, Wilawan; Karwowski, Waldemar; Ahram, Tareq Z

    2012-01-01

    Financial costs of investing in people is associated with training, acquisition, recruiting, and resolving human errors have a significant impact on increased total ownership costs. These costs can also affect the exaggerate budgets and delayed schedules. The study of human performance economical assessment in the system acquisition process enhances the visibility of hidden cost drivers which support program management informed decisions. This paper presents the literature review of human total ownership cost (HTOC) and cost impacts on overall system performance. Economic value assessment models such as cost benefit analysis, risk-cost tradeoff analysis, expected value of utility function analysis (EV), growth readiness matrix, multi-attribute utility technique, and multi-regressions model were introduced to reflect the HTOC and human performance-technology tradeoffs in terms of the dollar value. The human total ownership regression model introduces to address the influencing human performance cost component measurement. Results from this study will increase understanding of relevant cost drivers in the system acquisition process over the long term.

  6. 23 CFR 140.907 - Overhead and indirect construction costs.

    Science.gov (United States)

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  7. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  8. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  9. Quality Cost in the Construction Industry ' Preliminary Findings in Malaysia

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2010-06-01

    Full Text Available One of the key areas being emphasis in ISO 9001 Quality Management System (QMS is performance measurement towards continual improvement. Among the primary measuring tools is quality cost approach. Quality cost has been well practice in manufacturing sector but slowly gain its importance in construction industry. In fact Project Management Body of Knowledge (PMBOK has reckoned quality cost as one of the tool and technique in few of its management processes. In view of such circumstances that has prompted an effort to undertake a study to ascertain the level of knowledge and practice on quality cost in Malaysian construction landscape. The targeted group of respondents was the personnel in the project management team. Capitalizing Construction Industry Development Board (CIDB National Electronic Tendering Initiatives (NETI road shows which were held in year 2007 throughout the country, the author was able to garner 263 respondents representing the project management team. Subsequently the data gathered from the completed forms were analyzed using Statistical Package for Social Science (SPSS software. General findings indicated that the level of knowledge and practice on quality cost among the project management team were relatively low. One of the main contributing factors was poor knowledge in the area related to quality cost. Despite of such scenario most of the respondents showed their interest in acquiring knowledge in the field of quality cost. Hence quality cost approach is at the infancy stage in Malaysian construction industry.

  10. Total staff costs to implement a decision support system in nursing

    Directory of Open Access Journals (Sweden)

    Valéria Castilho

    2014-01-01

    Full Text Available OBJECTIVE: to identify the direct labor (DL costs to put in practice a decision support system (DSS in nursing at the University Hospital of the University of São Paulo (HU-USP. METHOD: the development of the DSS was mapped in four sub-processes: Conception, Elaboration, Construction and Transition. To calculate the DL, the baseline salary per professional category was added to the five-year additional remuneration, representation fees and social charges, and then divided by the number of hours contracted, resulting in the hour wage/professional, which was multiplied by the time spend on each activity in the sub-processes. RESULTS: the DL cost corresponded to R$ 752,618.56 (100%, R$ 26,000.00 (3.45% of which were funded by a funding agency, while R$ 726,618.56 (96,55% came from Hospital and University resources. CONCLUSION: considering the total DL cost, 72.1% related to staff wages for the informatics consulting company and 27.9% to the DL of professionals at the HU and the School of Nursing.

  11. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  12. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  13. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  14. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  15. Assessment of Cost Variation in Solid and Hollow Floor Construction in Lagos State

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2013-12-01

    Full Text Available The differences in construction methods between different forms of slabs construction tend to result into variation in the cost of the slabs for any building project. Thus, this study aims at assessing the variation in construction cost among various construction methods available for hollow and solid floors in construction projects within Lagos State. The research design for this study was a survey design approach and the population of the study are active professionals (Architects, Civil Engineers, Builders, Quantity Surveyors, Consultant and contractors because they are the major participants in the construction activities of the construction industry in Lagos State, Nigeria. The research is based on 46 returned questionnaires out of the 60 that was administered. The data from the questionnaires were analyzed using descriptive tools such as frequencies, percentage and mean values. The hypotheses were tested with paired sample t-test and it was found that the system or method of slab construction well known to the respondents is cast in situ, precast and semi-precast. The study also shows that the cost of in-situ solid slabs are higher than that of hollow slab which is an indication that solid slab construction is more expensive than hollow slab construction provided the hollow slab is a one-way hollow floor and not waffle floor. In pre cast solid slab construction the cost of transportation of units to sites, cost of expertise required in the construction process and the cost of fabrication off site are the three highest and most expensive aspects of precast solid slab while cost of erection and placement and the cost of grouting and topping if required are less expensive. Therefore there is difference in the cost of construction between the solid and hollow slabs but the difference is not appreciable. The study's major recommendation is that, adequate and careful analysis must be done in the choice of floor system being adopted for any

  16. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  17. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  18. User costs as one of main advantages of precast concrete application in highway construction

    Science.gov (United States)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  19. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  20. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  1. Direct cost comparison of totally endoscopic versus open ear surgery.

    Science.gov (United States)

    Patel, N; Mohammadi, A; Jufas, N

    2018-02-01

    Totally endoscopic ear surgery is a relatively new method for managing chronic ear disease. This study aimed to test the null hypothesis that open and endoscopic approaches have similar direct costs for the management of attic cholesteatoma, from an Australian private hospital setting. A retrospective direct cost comparison of totally endoscopic ear surgery and traditional canal wall up mastoidectomy for the management of attic cholesteatoma in a private tertiary setting was undertaken. Indirect and future costs were excluded. A direct cost comparison of anaesthetic setup and resources, operative setup and resources, and surgical time was performed between the two techniques. Totally endoscopic ear surgery has a mean direct cost reduction of AUD$2978.89 per operation from the hospital perspective, when compared to canal wall up mastoidectomy. Totally endoscopic ear surgery is more cost-effective, from an Australian private hospital perspective, than canal wall up mastoidectomy for attic cholesteatoma.

  2. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  3. An Environmentally Oriented Constructive Cost Model In Information ...

    African Journals Online (AJOL)

    A model was designed to assist software developers in Nigeria to estimate software effort, duration and cost as a result of the difficulties in understanding the parameters of the traditional Constructive Cost Model II (COCOMO II) , which was designed for a specif ic environment, using Source Lines of Code (SLOC) . Results ...

  4. Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

    Directory of Open Access Journals (Sweden)

    Adela Breuer

    2010-12-01

    Full Text Available Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

  5. 19 CFR 351.407 - Calculation of constructed value and cost of production.

    Science.gov (United States)

    2010-04-01

    ... ANTIDUMPING AND COUNTERVAILING DUTIES Calculation of Export Price, Constructed Export Price, Fair Value, and Normal Value § 351.407 Calculation of constructed value and cost of production. (a) Introduction. This... 19 Customs Duties 3 2010-04-01 2010-04-01 false Calculation of constructed value and cost of...

  6. The Cost of Joint Replacement: Comparing Two Approaches to Evaluating Costs of Total Hip and Knee Arthroplasty.

    Science.gov (United States)

    Palsis, John A; Brehmer, Thomas S; Pellegrini, Vincent D; Drew, Jacob M; Sachs, Barton L

    2018-02-21

    In an era of mandatory bundled payments for total joint replacement, accurate analysis of the cost of procedures is essential for orthopaedic surgeons and their institutions to maintain viable practices. The purpose of this study was to compare traditional accounting and time-driven activity-based costing (TDABC) methods for estimating the total costs of total hip and knee arthroplasty care cycles. We calculated the overall costs of elective primary total hip and total knee replacement care cycles at our academic medical center using traditional and TDABC accounting methods. We compared the methods with respect to the overall costs of hip and knee replacement and the costs for each major cost category. The traditional accounting method resulted in higher cost estimates. The total cost per hip replacement was $22,076 (2014 USD) using traditional accounting and was $12,957 using TDABC. The total cost per knee replacement was $29,488 using traditional accounting and was $16,981 using TDABC. With respect to cost categories, estimates using traditional accounting were greater for hip and knee replacement, respectively, by $3,432 and $5,486 for personnel, by $3,398 and $3,664 for space and equipment, and by $2,289 and $3,357 for indirect costs. Implants and consumables were derived from the actual hospital purchase price; accordingly, both methods produced equivalent results. Substantial cost differences exist between accounting methods. The focus of TDABC only on resources used directly by the patient contrasts with the allocation of all operating costs, including all indirect costs and unused capacity, with traditional accounting. We expect that the true costs of hip and knee replacement care cycles are likely somewhere between estimates derived from traditional accounting methods and TDABC. TDABC offers patient-level granular cost information that better serves in the redesign of care pathways and may lead to more strategic resource-allocation decisions to optimize

  7. Modeling of Construction Cost of Villas in Oman

    Directory of Open Access Journals (Sweden)

    MA Al-Mohsin

    2014-06-01

    Full Text Available In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.

  8. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  9. A general approach to total repair cost limit replacement policies

    Directory of Open Access Journals (Sweden)

    F. Beichelt

    2014-01-01

    Full Text Available A common replacement policy for technical systems consists in replacing a system by a new one after its economic lifetime, i.e. at that moment when its long-run maintenance cost rate is minimal. However, the strict application of the economic lifetime does not take into account the individual deviations of maintenance cost rates of single systems from the average cost development. Hence, Beichet proposed the total repair cost limit replacement policy: the system is replaced by a new one as soon as its total repair cost reaches or exceeds a given level. He modelled the repair cost development by functions of the Wiener process with drift. Here the same policy is considered under the assumption that the one-dimensional probability distribution of the process describing the repair cost development is given. In the examples analysed, applying the total repair cost limit replacement policy instead of the economic life-time leads to cost savings of between 4% and 30%. Finally, it is illustrated how to include the reliability aspect into the policy.

  10. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  11. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  12. Designing for second generation value - future proofing constructions

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2012-01-01

    Lifecycle consideration in terms of environmental impact and total cost of buildings attract increased focus in construction. Here, total cost and environmental impact both involves: erection, operation, maintenance, demolition, and disposal of the building. The mindset of Lean Construction...

  13. Animal board invited review: Dairy cow lameness expenditures, losses and total cost.

    Science.gov (United States)

    Dolecheck, K; Bewley, J

    2018-03-20

    Lameness is one of the most costly dairy cow diseases, yet adoption of lameness prevention strategies remains low. Low lameness prevention adoption might be attributable to a lack of understanding regarding total lameness costs. In this review, we evaluated the contribution of different expenditures and losses to total lameness costs. Evaluated expenditures included labor for treatment, therapeutic supplies, lameness detection and lameness control and prevention. Evaluated losses included non-saleable milk, reduced milk production, reduced reproductive performance, increased animal death, increased animal culling, disease interrelationships, lameness recurrence and reduced animal welfare. The previous literature on total lameness cost estimates was also summarized. The reviewed studies indicated that previous estimates of total lameness costs are variable and inconsistent in the expenditures and losses they include. Many of the identified expenditure and loss categories require further research to accurately include in total lameness cost estimates. Future research should focus on identifying costs associated with specific lameness conditions, differing lameness severity levels, and differing stages of lactation at onset of lameness to provide better total lameness cost estimates that can be useful for decision making at both the herd and individual cow level.

  14. Association of Hospital Costs With Complications Following Total Gastrectomy for Gastric Adenocarcinoma.

    Science.gov (United States)

    Selby, Luke V; Gennarelli, Renee L; Schnorr, Geoffrey C; Solomon, Stephen B; Schattner, Mark A; Elkin, Elena B; Bach, Peter B; Strong, Vivian E

    2017-10-01

    Postoperative complications are associated with increased hospital costs following major surgery, but the mechanism by which they increase cost and the categories of care that drive this increase are poorly described. To describe the association of postoperative complications with hospital costs following total gastrectomy for gastric adenocarcinoma. This retrospective analysis of a prospectively collected gastric cancer surgery database at a single National Cancer Institute-designated comprehensive cancer center included all patients undergoing curative-intent total gastrectomy for gastric adenocarcinoma between January 2009 and December 2012 and was conducted in 2015 and 2016. Ninety-day normalized postoperative costs. Hospital accounting system costs were normalized to reflect Medicare reimbursement levels using the ratio of hospital costs to Medicare reimbursement and categorized into major cost categories. Differences between costs in Medicare proportional dollars (MP $) can be interpreted as the amount that would be reimbursed to an average hospital by Medicare if it paid differentially based on types and extent of postoperative complications. In total, 120 patients underwent curative-intent total gastrectomy for stage I through III gastric adenocarcinoma between 2009 and 2012. Of these, 79 patients (65.8%) were men, and the median (interquartile range) age was 64 (52-70) years. The 51 patients (42.5%) who underwent an uncomplicated total gastrectomy had a mean (SD) normalized cost of MP $12 330 (MP $2500), predominantly owing to the cost of surgical care (mean [SD] cost, MP $6830 [MP $1600]). The 34 patients (28.3%) who had a major complication had a mean (SD) normalized cost of MP $37 700 (MP $28 090). Surgical care was more expensive in these patients (mean [SD] cost, MP $8970 [MP $2750]) but was a smaller contributor to total cost (24%) owing to increased costs from room and board (mean [SD] cost, MP $11 940 [MP $8820]), consultations (mean [SD

  15. Construction of VLCC marine oil storage cost index system

    Science.gov (United States)

    Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen

    2018-04-01

    VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.

  16. Designing for second generation value – Future proofing construction

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    Lifecycle consideration in terms of environmental impact and total cost of buildings attract increased focus in construction. Here total cost and environmental impact both involves: erection, operation, maintenance, demolition, and disposal of the building. The mindset of Lean Construction...

  17. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  18. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  19. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  20. Construction costs, payback times, and the leaf economics of carnivorous plants.

    Science.gov (United States)

    Karagatzides, Jim D; Ellison, Aaron M

    2009-09-01

    Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.

  1. The total lifetime health cost savings of smoking cessation to society

    DEFF Research Database (Denmark)

    Rasmussen, Gitte Susanne; Prescott, Eva; Sørensen, Thorkild I A

    2005-01-01

    Smoking cessation has major immediate and long-term health benefits. However, ex-smokers' total lifetime health costs and continuing smokers' costs remain uncompared, and hence the economic savings of smoking cessation to society have not been determined.......Smoking cessation has major immediate and long-term health benefits. However, ex-smokers' total lifetime health costs and continuing smokers' costs remain uncompared, and hence the economic savings of smoking cessation to society have not been determined....

  2. The Cost-Effectiveness of Dual Mobility Implants for Primary Total Hip Arthroplasty: A Computer-Based Cost-Utility Model.

    Science.gov (United States)

    Barlow, Brian T; McLawhorn, Alexander S; Westrich, Geoffrey H

    2017-05-03

    Dislocation remains a clinically important problem following primary total hip arthroplasty, and it is a common reason for revision total hip arthroplasty. Dual mobility (DM) implants decrease the risk of dislocation but can be more expensive than conventional implants and have idiosyncratic failure mechanisms. The purpose of this study was to investigate the cost-effectiveness of DM implants compared with conventional bearings for primary total hip arthroplasty. Markov model analysis was conducted from the societal perspective with use of direct and indirect costs. Costs, expressed in 2013 U.S. dollars, were derived from the literature, the National Inpatient Sample, and the Centers for Medicare & Medicaid Services. Effectiveness was expressed in quality-adjusted life years (QALYs). The model was populated with health state utilities and state transition probabilities derived from previously published literature. The analysis was performed for a patient's lifetime, and costs and effectiveness were discounted at 3% annually. The principal outcome was the incremental cost-effectiveness ratio (ICER), with a willingness-to-pay threshold of $100,000/QALY. Sensitivity analyses were performed to explore relevant uncertainty. In the base case, DM total hip arthroplasty showed absolute dominance over conventional total hip arthroplasty, with lower accrued costs ($39,008 versus $40,031 U.S. dollars) and higher accrued utility (13.18 versus 13.13 QALYs) indicating cost-savings. DM total hip arthroplasty ceased being cost-saving when its implant costs exceeded those of conventional total hip arthroplasty by $1,023, and the cost-effectiveness threshold for DM implants was $5,287 greater than that for conventional implants. DM was not cost-effective when the annualized incremental probability of revision from any unforeseen failure mechanism or mechanisms exceeded 0.29%. The probability of intraprosthetic dislocation exerted the most influence on model results. This model

  3. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  4. A Refined Basket of Goods Approach for Comparing Construction Costs between Countries

    Directory of Open Access Journals (Sweden)

    Rick Best

    2012-11-01

    Full Text Available Most comparisons of construction industry performance requirethat construction costs be converted to a common base. Existingmechanisms for such conversions produce unreliable results.A proposed method for producing industry-specifi c conversionfactors was tested using a single building type. A basket ofmaterials and labour was identifi ed and weighted to refl ect the costshare of each item in a completed project. Prices for the basketwere gathered in three cities and simple construction specifi cconversion indices were calculated based on the constructionpurchasing power of each currency. The construction purchasingpower parities (CPPPs showed marked differences from otheravailable conversion mechanisms such as exchange rates andgeneral purchasing power parities (PPPs that have been used inprevious international comparison studies. While the study waslimited in scope, and is only the fi rst stage of a longer process, thesubstantial differences in comparative costs based on purchasingpower illustrate the problems inherent in international costcomparisons. For example, comparing Singapore and Sydney,Singapore costs appear to be only 40% of those in Sydney (basedon exchange rates about two-thirds the cost of Sydney (usinggeneral PPPs or almost the same (using the preliminary CPPPs.These results illustrate the problems of converting costs fromlocal currencies to a single base currency and suggest that furtherdevelopment is needed to improve the reliability of outcomes.

  5. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  6. Controlling costs without compromising quality: paying hospitals for total knee replacement.

    Science.gov (United States)

    Pine, Michael; Fry, Donald E; Jones, Barbara L; Meimban, Roger J; Pine, Gregory J

    2010-10-01

    Unit costs of health services are substantially higher in the United States than in any other developed country in the world, without a correspondingly healthier population. An alternative payment structure, especially for high volume, high cost episodes of care (eg, total knee replacement), is needed to reward high quality care and reduce costs. The National Inpatient Sample of administrative claims data was used to measure risk-adjusted mortality, postoperative length-of-stay, costs of routine care, adverse outcome rates, and excess costs of adverse outcomes for total knee replacements performed between 2002 and 2005. Empirically identified inefficient and ineffective hospitals were then removed to create a reference group of high-performance hospitals. Predictive models for outcomes and costs were recalibrated to the reference hospitals and used to compute risk-adjusted outcomes and costs for all hospitals. Per case predicted costs were computed and compared with observed costs. Of the 688 hospitals with acceptable data, 62 failed to meet effectiveness criteria and 210 were identified as inefficient. The remaining 416 high-performance hospitals had 13.4% fewer risk-adjusted adverse outcomes (4.56%-3.95%; P costs ($12,773-$11,512; P costs. A payment system based on the demonstrated performance of effective, efficient hospitals can produce sizable cost savings without jeopardizing quality. In this study, 96% of total excess hospital costs resulted from higher routine costs at inefficient hospitals, whereas only 4% was associated with ineffective care.

  7. CANDU 9 - reducing capital costs through advanced construction

    International Nuclear Information System (INIS)

    Hedges, K.; Yu, S.; Hopwood, J.

    1996-01-01

    Reducing costs is a clear priority in nuclear markets where capital reaches billions and financing is hard-won. To address that priority, AECL introduced the use of advanced construction techniques. This has been one of the key thrusts behind its development of CANDU 9. (author)

  8. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  9. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... cost-significant items, 15 priced bills of quantities of high rise office building pro ects executed or awarded in Nigeria between 2002 and 2011 were analysed. The study found that11 (29. %) out of 3 bill items were cost-significant accounting for 2.2% of total value of the work. The implication of the finding is ...

  10. Managing the total cost of risk exposures through risk mapping techniques

    International Nuclear Information System (INIS)

    Unione, A.J.; Rode, D.M.

    1998-01-01

    In a competitive power market, power producers are exposed to an increasingly broad spectrum of financial risks. The cumulative impact of these financial risks is known collectively as the Total of Cost of Risk. The concept of Total of Cost of Risk presents the business reality of a company's exposure to potentially devastating financial consequences in an integrated and useful way. In this way, a strategy of managing Total Cost of Risk in the most cost effective way can become a means of ensuring long term business health and security. This paper will examine the use of risk mapping as a tool for visually understanding Total Cost of Risk, thus creating an enhanced situational awareness and an integrated basis for risk management decision. The evaluation process, available through the use of risk maps allows the power producers to pro-actively implement prudent business decisions concerning the design, operation and maintenance of power plants. Risk mapping is thus a means for harmonizing operational objectives, such as improved plant reliability, with corporate strategies and goals in terms of an effective risk management program

  11. External risk factors affecting construction costs

    Science.gov (United States)

    Mubarak, Husin, Saiful; Oktaviati, Mutia

    2017-11-01

    Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.

  12. Forecasting Construction Cost Index based on visibility graph: A network approach

    Science.gov (United States)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  13. Evaluation of ways and procedures to reduce construction cost and increase competition.

    Science.gov (United States)

    2009-01-01

    Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...

  14. [Total knee and hip prosthesis: variables associated with costs].

    Science.gov (United States)

    Herrera-Espiñeira, Carmen; Escobar, Antonio; Navarro-Espigares, José Luis; Castillo, Juan de Dios Lunadel; García-Pérez, Lidia; Godoy-Montijano, Amparo

    2013-01-01

    The elevated prevalence of osteoarthritis in Western countries, the high costs of hip and knee arthroplasty, and the wide variations in the clinical practice have generated considerable interest in comparing the associated costs before and after surgery. To determine the influence of a number of variables on the costs of total knee and hip arthroplasty surgery during the hospital stay and during the one-year post-discharge. A prospective multi-center study was performed in 15 hospitals from three Spanish regions. Relationships between the independent variables and the costs of hospital stay and postdischarge follow-up were analyzed by using multilevel models in which the "hospital" variable was used to group cases. Independent variables were: age, sex, body mass index, preoperative quality of life (SF-12, EQ-5 and Womac questionnaires), surgery (hip/knee), Charlson Index, general and local complications, number of beds and economic-institutional dependency of the hospital, the autonomous region to which it belongs, and the presence of a caregiver. The cost of hospital stay, excluding the cost of the prosthesis, was 4,734 Euros, and the post-discharge cost was 554 Euros. With regard to hospital stay costs, the variance among hospitals explained 44-46% of the total variance among the patients. With regard to the post-discharge costs, the variability among hospitals explained 7-9% of the variance among the patients. There is considerable potential for reducing the hospital stay costs of these patients, given that more than 44% of the observed variability was not determined by the clinical conditions of the patients but rather by the behavior of the hospitals.

  15. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  16. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  17. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  18. Use of cost-effective construction technologies in India to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, N. [Forum of Scientists, Engineers and Technologists, Kolkata (India)

    2008-01-10

    Concentration of greenhouse gases plays a major role in raising the earth's temperature. Carbon dioxide, produced from burning of fossil fuels, is the principle greenhouse gas and efforts are being made at international level to reduce its emission through adoption of energy-efficient technologies. The UN Conference on Environment and Development, 1992 made a significant development in this field by initiating the discussion on sustainable development under the Agenda 21. Cost-effective construction technologies can bring down the embodied energy level associated with production of building materials by lowering use of energy-consuming materials. This embodied energy is a crucial factor for sustainable construction practices and effective reduction of the same would contribute in mitigating global warming. The cost-effective construction technologies would emerge as the most acceptable case of sustainable technologies in India both in terms of cost and environment.

  19. Effects of the Length of Stay on the Cost of Total Knee and Total Hip Arthroplasty from 2002 to 2013.

    Science.gov (United States)

    Molloy, Ilda B; Martin, Brook I; Moschetti, Wayne E; Jevsevar, David S

    2017-03-01

    Utilization of total knee and hip arthroplasty has greatly increased in the past decade in the United States; these are among the most expensive procedures in patients with Medicare. Advances in surgical techniques, anesthesia, and care pathways decrease hospital length of stay. We examined how trends in hospital cost were altered by decreases in length of stay. Procedure, demographic, and economic data were collected on 6.4 million admissions for total knee arthroplasty and 2.8 million admissions for total hip arthroplasty from 2002 to 2013 using the National (Nationwide) Inpatient Sample, a component of the Healthcare Cost and Utilization Project. Trends in mean hospital costs and their association with length of stay were estimated using inflation-adjusted, survey-weighted generalized linear regression models, controlling for patient demographic characteristics and comorbidity. From 2002 to 2013, the length of stay decreased from a mean time of 4.06 to 2.97 days for total knee arthroplasty and from 4.06 to 2.75 days for total hip arthroplasty. During the same time period, the mean hospital cost for total knee arthroplasty increased from $14,988 (95% confidence interval [CI], $14,927 to $15,049) in 2002 to $22,837 (95% CI, $22,765 to $22,910) in 2013 (an overall increase of $7,849 or 52.4%). The mean hospital cost for total hip arthroplasty increased from $15,792 (95% CI, $15,706 to $15,878) in 2002 to $23,650 (95% CI, $23,544 to $23,755) in 2013 (an increase of $7,858 or 49.8%). If length of stay were set at the 2002 mean, the growth in cost for total knee arthroplasty would have been 70.8% instead of 52.4% as observed, and the growth in cost for total hip arthroplasty would have been 67.4% instead of 49.8% as observed. Hospital costs for joint replacement increased from 2002 to 2013, but were attenuated by reducing inpatient length of stay. With demographic characteristics showing an upward trend in the utilization of joint arthroplasty, including a shift

  20. Total cost of ownership: Getting past the 10% solution

    International Nuclear Information System (INIS)

    Anderson, R.F.

    1996-01-01

    As the refining industry strives to succeed in a more-competitive world, some fresh ideas are needed to counter the headlines of plant closings, layoffs, and corporate restructurings. Other industries facing the same pressures have discovered opportunities to reduce cost in a more human and effective manner by using some tools borrowed from the Total Quality process to enhance the procurement process. Experience suggests that the purchase cost is a small fraction of the actual cost of a commodity and is often dwarfed by hidden costs. Discovering and eliminating the hidden costs of variation, nonoptimal operations, and poorly aligned vendor relations is vital to economic survival. The purpose of this paper is to suggest some fresh approaches to vendor-customer relations that can dramatically reduce undesired costs

  1. PHENIX WBS notes. Cost and schedule review copy

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

  2. Variation in the cost of care for primary total knee arthroplasties.

    Science.gov (United States)

    Haas, Derek A; Kaplan, Robert S

    2017-03-01

    The study examined the cost variation across 29 high-volume US hospitals and their affiliated orthopaedic surgeons for delivering a primary total knee arthroplasty without major complicating conditions. The hospitals had similar patient demographics, and more than 80% of them had statistically-similar Medicare risk-adjusted readmission and complication rates. Hospital and physician personnel costs were calculated using time-driven activity-based costing. Consumable supply costs, such as the prosthetic implant, were calculated using purchase prices, and postacute care costs were measured using either internal costs or external claims as reported by each hospital. Despite having similar patient demographics and readmission and complication rates, the average cost of care for total knee arthroplasty across the hospitals varied by a factor of about 2 to 1. Even after adjusting for differences in internal labor cost rates, the hospital at the 90th percentile of cost spent about twice as much as the one at the 10th percentile of cost. The large variation in costs among sites suggests major and multiple opportunities to transfer knowledge about process and productivity improvements that lower costs while simultaneously maintaining or improving outcomes.

  3. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  4. Low cost construction technologies and materials - case study Mozambuique

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-09-01

    Full Text Available Low cost or affordable construction technologies and materials are often touted as a panacea in meeting the ever growing demand for rapid housing delivery in developing economies. Mozambique as with most of the developing world, from both historical...

  5. How do high cost-sharing policies for physician care affect total care costs among people with chronic disease?

    Science.gov (United States)

    Xin, Haichang; Harman, Jeffrey S; Yang, Zhou

    2014-01-01

    This study examines whether high cost-sharing in physician care is associated with a differential impact on total care costs by health status. Total care includes physician care, emergency room (ER) visits and inpatient care. Since high cost-sharing policies can reduce needed care as well as unneeded care use, it raises the concern whether these policies are a good strategy for controlling costs among chronically ill patients. This study used the 2007 Medical Expenditure Panel Survey data with a cross-sectional study design. Difference in difference (DID), instrumental variable technique, two-part model, and bootstrap technique were employed to analyze cost data. Chronically ill individuals' probability of reducing any overall care costs was significantly less than healthier individuals (beta = 2.18, p = 0.04), while the integrated DID estimator from split results indicated that going from low cost-sharing to high cost-sharing significantly reduced costs by $12,853.23 more for sick people than for healthy people (95% CI: -$17,582.86, -$8,123.60). This greater cost reduction in total care among sick people likely resulted from greater cost reduction in physician care, and may have come at the expense of jeopardizing health outcomes by depriving patients of needed care. Thus, these policies would be inappropriate in the short run, and unlikely in the long run to control health plans costs among chronically ill individuals. A generous benefit design with low cost-sharing policies in physician care or primary care is recommended for both health plans and chronically ill individuals, to save costs and protect these enrollees' health status.

  6. Development of geological disposal system; localization of element cost data and cost evaluation on the HLW repository

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Sik; Kim, Kil Jung; Yang, Young Jin; Kim, Sung Chun [KOPEC, Taejeon (Korea)

    2002-03-01

    To estimate Total Life Cycle Cost (TSLCC) for Korea HLW Repository through localization of element cost data, we review and re-organize each basic element cost data for reference repository system, localize various element cost and finally estimate TSLCC considering economic parameters. As results of the study, TSLCC is estimated as 17,167,689 million won, which includes costs for site preparation, surface facilities, underground facilities and management/integration. Since HLW repository Project is an early stage of pre-conceptual design at present, the information of design and project information are not enough to perform cost estimate and cost localization for the Project. However, project cost structure is re-organized based on the local condition and Total System Life Cycle Cost is estimated using the previous cost data gathered from construction experience of the local nuclear power plant. Project results can be used as basic reference data to assume total construction cost for the local HLW repository and should be revised to more reliable cost data with incorporating detail project design information into the cost estimate in a future. 20 refs. (Author)

  7. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  8. Construction of road network vulnerability evaluation index based on general travel cost

    Science.gov (United States)

    Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin

    2018-03-01

    With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.

  9. Cost-Effectiveness of Reverse Total Shoulder Arthroplasty Versus Arthroscopic Rotator Cuff Repair for Symptomatic Large and Massive Rotator Cuff Tears.

    Science.gov (United States)

    Makhni, Eric C; Swart, Eric; Steinhaus, Michael E; Mather, Richard C; Levine, William N; Bach, Bernard R; Romeo, Anthony A; Verma, Nikhil N

    2016-09-01

    To compare the cost-effectiveness within the United States health care system of arthroscopic rotator cuff repair versus reverse total shoulder arthroplasty in patients with symptomatic large and massive rotator cuff tears without cuff-tear arthropathy. An expected-value decision analysis was constructed comparing the costs and outcomes of patients undergoing arthroscopic rotator cuff repair and reverse total shoulder arthroplasty for large and massive rotator cuff tears (and excluding cases of cuff-tear arthropathy). Comprehensive literature search provided input data to extrapolate costs and health utility states for these outcomes. The primary outcome assessed was that of incremental cost-effectiveness ratio (ICER) of reverse total shoulder arthroplasty versus rotator cuff repair. For the base case, both arthroscopic rotator cuff repair and reverse total shoulder were superior to nonoperative care, with an ICER of $15,500/quality-adjusted life year (QALY) and $37,400/QALY, respectively. Arthroscopic rotator cuff repair was dominant over primary reverse total shoulder arthroplasty, with lower costs and slightly improved clinical outcomes. Arthroscopic rotator cuff repair was the preferred strategy as long as the lifetime progression rate from retear to end-stage cuff-tear arthropathy was less than 89%. However, when the model was modified to account for worse outcomes when reverse shoulder arthroplasty was performed after a failed attempted rotator cuff repair, primary reverse total shoulder had superior outcomes with an ICER of $90,000/QALY. Arthroscopic rotator cuff repair-despite high rates of tendon retearing-for patients with large and massive rotator cuff tears may be a more cost-effective initial treatment strategy when compared with primary reverse total shoulder arthroplasty and when assuming no detrimental impact of previous surgery on outcomes after arthroplasty. Clinical judgment should still be prioritized when formulating treatment plans for these

  10. PHENIX Work Breakdown Structure. Cost and schedule review copy

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

  11. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  12. Strategies for reducing implant costs in the revision total knee arthroplasty episode of care.

    Science.gov (United States)

    Elbuluk, Ameer M; Old, Andrew B; Bosco, Joseph A; Schwarzkopf, Ran; Iorio, Richard

    2017-12-01

    Implant price has been identified as a significant contributing factor to high costs associated with revision total knee arthroplasty (rTKA). The goal of this study is to analyze the cost of implants used in rTKAs and to compare this pricing with 2 alternative pricing models. Using our institutional database, we identified 52 patients from January 1, 2014 to December 31, 2014. Average cost of components for each case was calculated and compared to the total hospital cost for that admission. Costs for an all-component revision were then compared to a proposed "direct to hospital" (DTH) standardized pricing model and a fixed price revision option. Potential savings were calculated from these figures. On average, 28% of the total hospital cost was spent on implants for rTKA. The average cost for revision of all components was $13,640 and ranged from $3000 to $28,000. On average, this represented 32.7% of the total hospital cost. Direct to hospital implant pricing could potentially save approximately $7000 per rTKA, and the fixed pricing model could provide a further $1000 reduction per rTKA-potentially saving $8000 per case on implants alone. Alternative implant pricing models could help lower the total cost of rTKA, which would allow hospitals to achieve significant cost containment.

  13. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  14. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  15. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  16. Salt marsh construction costs and shrimp production in Galveston Bay and Gulf of Mexico from 1999-01-01 to 2005-01-01 (NCEI Accession 0161218)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains marsh construction cost in relation to shrimp yield per year. This modeling approach provides estimates of total annual shrimp production from...

  17. Resource use and costs associated with opioid-induced constipation following total hip or total knee replacement surgery

    Directory of Open Access Journals (Sweden)

    Wittbrodt ET

    2018-05-01

    Full Text Available Eric T Wittbrodt,1 Tong J Gan,2 Catherine Datto,1 Charles McLeskey,1 Meenal Sinha3 1US Medical Affairs, AstraZeneca, Wilmington, DE, USA; 2Department of Anesthesiology, Stony Brook Medicine, Stony Brook, NY, USA; 3Premier Applied Sciences, Premier, Inc., Charlotte, NC, USA Purpose: Constipation is a well-known complication of surgery that can be exacerbated by opioid analgesics. This study evaluated resource utilization and costs associated with opioid-induced constipation (OIC. Patients and methods: This retrospective, observational, and propensity-matched cohort study utilized the Premier Healthcare Database. The study included adults ≥18 years of age undergoing total hip or total knee replacement as inpatients who received an opioid analgesic and were discharged between January 1, 2012, and June 30, 2015. Diagnosis codes identified patients with OIC who were then matched 1:1 to patients without OIC. Generalized linear and logistic regression models were used to compare inpatient resource utilization, total hospital costs, inpatient mortality, and 30-day all-cause readmissions and emergency department visits. Results: Of 788,448 eligible patients, 40,891 (5.2% had OIC. Covariates were well balanced between matched patients with and without OIC (n=40,890 each. In adjusted analyses, patients with OIC had longer hospital lengths of stay (3.6 versus 3.3 days; p<0.001, higher total hospital costs (US$17,479 versus US$16,265; p<0.001, greater risk of intensive care unit admission (odds ratio [OR]=1.12, 95% CI: 1.01–1.24, and increased likelihood of 30-day hospital readmissions (OR=1.16, 95% CI: 1.11–1.22 and emergency department visits (OR=1.38, 95% CI: 1.07–1.79 than patients without OIC. No statistically significant difference was found with inpatient mortality (OR=0.89, 95% CI: 0.59–1.35. Conclusion: OIC was associated with greater resource utilization and hospital costs for patients undergoing primarily elective total hip or total knee

  18. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  19. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  20. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  1. Total life-cycle cost analysis of conventional and alternative fueled vehicles

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1993-01-01

    Total Life-Cycle Cost (TLCC) Analysis can indicate whether paying higher capital costs for advanced technology with low operating and/or environmental costs is advantageous over paying lower capital costs for conventional technology with higher operating and/or environmental costs. While minimizing total life-cycle cost is an important consideration, the consumer often identifies non-cost-related benefits or drawbacks that make more expensive options appear more attractive. The consumer is also likely to heavily weigh initial capital costs while giving limited consideration to operating and/or societal costs, whereas policy-makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. This paper summarizes a TLCC model which was developed to facilitate consideration of the various factors involved in both individual and societal policy decision making. The model was developed as part of a US Department of Energy Contract and has been revised to reflect changes necessary to make the model more realistic. The model considers capital, operating, salvage, and environmental costs for cars, vans, and buses using conventional and alternative fuels. The model has been developed to operate on an IBM or compatible personal computer platform using the commercial spreadsheet program MicroSoft Excell reg-sign Version 4 for Windows reg-sign and can be easily kept current because its modular structure allows straightforward access to embedded data sets for review and update

  2. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  3. Stakeout electronic total station construction layout boring of the experience and precision

    International Nuclear Information System (INIS)

    Xu Zhiqiang

    2012-01-01

    Electronic total station can simultaneously measure angle and distance, together with the appropriate calculation methods and operating skills, able to efficiently complete the survey work, this paper based on practical experience, theoretical analysis, based on total station introduced in setting out a few boring in the skills and the measurement of total station in the construction layout for accuracy. (authors)

  4. Intensive care unit drug costs in the context of total hospital drug expenditures with suggestions for targeted cost containment efforts.

    Science.gov (United States)

    Altawalbeh, Shoroq M; Saul, Melissa I; Seybert, Amy L; Thorpe, Joshua M; Kane-Gill, Sandra L

    2018-04-01

    To assess costs of intensive care unit (ICU) related pharmacotherapy relative to hospital drug expenditures, and to identify potential targets for cost-effectiveness investigations. We offer the unique advantage of comparing ICU drug costs with previously published data a decade earlier to describe changes over time. Financial transactions for all ICU patients during fiscal years (FY) 2009-2012 were retrieved from the hospital's data repository. ICU drug costs were evaluated for each FY. ICU departments' charges were also retrieved and calculated as percentages of total ICU charges. Albumin, prismasate (dialysate), voriconazole, factor VII and alteplase denoted the highest percentages of ICU drug costs. ICU drug costs contributed to an average of 31% (SD 1.0%) of the hospital's total drug costs. ICU drug costs per patient day increased by 5.8% yearly versus 7.8% yearly for non-ICU drugs. This rate was higher for ICU drugs costs at 12% a decade previous. Pharmacy charges contributed to 17.7% of the total ICU charges. Growth rates of costs per year have declined but still drug expenditures in the ICU are consistently a significant driver in this resource intensive environment with a high impact on hospital drug expenditures. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  6. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  7. Retail clinic utilization associated with lower total cost of care.

    Science.gov (United States)

    Sussman, Andrew; Dunham, Lisette; Snower, Kristen; Hu, Min; Matlin, Olga S; Shrank, William H; Choudhry, Niteesh K; Brennan, Troyen

    2013-04-01

    To better understand the impact of retail clinic use on a patient's annual total cost of care. A propensity score matched-pair, cohort design was used to analyze healthcare spending patterns among CVS Caremark employees in the year following a visit to a MinuteClinic, the retail clinics inside CVS pharmacies. De-identified medical and pharmacy claims for CVS Caremark employees and their dependents who received care at a retail clinic between June 1, 2009, and May 31, 2010, were matched to those of subjects who received care elsewhere. High-dimensional propensity score and greedy matching techniques were used to create a 1-to-1 matched cohort that was analyzed using generalized linear regression models. Individuals using a retail clinic had a lower total cost of care (-$262; 95% confidence interval, -$510 to -$31; P = .025) in the year following their clinic visit than individuals who received care in other settings. This savings was primarily due to lower medical expenses at physicians' offices ($77 savings, P = .008) and hospital inpatient care ($121 savings, P = .049). The 6022 retail clinic users also had 142 (12%) fewer emergency department visits (P = .01), though this was not related to significant cost savings. This study found that retail clinic use was associated with lower overall total cost of care compared with that at alternative sites. Savings may extend beyond the retail clinic visit itself to other types of medical utilization.

  8. Determining the total cost of reverse supply chain operations for original equipment manufacturers

    DEFF Research Database (Denmark)

    Larsen, Samuel Brüning; Jacobsen, Peter

    2014-01-01

    When original equipment manufacturers (OEM) examine whether or not to invest in a reverse supply chain (RSC), managers need insight into not only the cost savings and new revenue streams the RSC enables, but also the total cost of the RSC itself. Using case study research the study examines what...... cost parameters constitute the total cost (TC) of the RSC. The specific RSC that the study seeks the TC for consists of 1) end-product refurbishing, 2) component refurbishing, and 3) sales of used materials back to original suppliers or independent recyclers for materials recycling....

  9. Patterns of pharmacotherapy and health care utilization and costs prior to total hip or total knee replacement in patients with osteoarthritis.

    Science.gov (United States)

    Berger, Ariel; Bozic, Kevin; Stacey, Brett; Edelsberg, John; Sadosky, Alesia; Oster, Gerry

    2011-08-01

    To examine patterns of pharmacotherapy and health care utilization and costs prior to total knee replacement (TKR) or total hip replacement (THR) in patients with osteoarthritis (OA). Using a large US health insurance claims database, we identified all patients with OA who were ages ≥40 years and had undergone TKR or THR between January 1, 2006 and December 31, 2007. Patients with care utilization and costs over the 2-year period preceding surgery. A total of 16,527 patients met all study entry criteria. Their mean ± SD age was 56.6 ± 6.1 years, and 56% of them were women. In the 2 years preceding surgery, 55% of patients received prescription nonsteroidal antiinflammatory drugs, 58% received opioids, and 50% received injections of corticosteroids. The numbers of patients receiving these drugs increased steadily during the presurgery period. The mean ± SD total health care costs in the 2 years preceding surgery were $19,466 ± 29,869, of which outpatient care, inpatient care, and pharmacotherapy represented 45%, 20%, and 20%, respectively. Costs increased from $2,094 in the eighth calendar quarter prior to surgery to $3,100 in the final quarter. Patients with OA who undergo THR or TKR have relatively high levels of use of pain-related pharmacotherapy and high total health care costs in the 2-year period preceding surgery. Levels of utilization and cost increase as the date of surgery approaches. Copyright © 2011 by the American College of Rheumatology.

  10. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  11. A decision-making framework for total ownership cost management of complex systems: A Delphi study

    Science.gov (United States)

    King, Russel J.

    This qualitative study, using a modified Delphi method, was conducted to develop a decision-making framework for the total ownership cost management of complex systems in the aerospace industry. The primary focus of total ownership cost is to look beyond the purchase price when evaluating complex system life cycle alternatives. A thorough literature review and the opinions of a group of qualified experts resulted in a compilation of total ownership cost best practices, cost drivers, key performance factors, applicable assessment methods, practitioner credentials and potential barriers to effective implementation. The expert panel provided responses to the study questions using a 5-point Likert-type scale. Data were analyzed and provided to the panel members for review and discussion with the intent to achieve group consensus. As a result of the study, the experts agreed that a total ownership cost analysis should (a) be as simple as possible using historical data; (b) establish cost targets, metrics, and penalties early in the program; (c) monitor the targets throughout the product lifecycle and revise them as applicable historical data becomes available; and (d) directly link total ownership cost elements with other success factors during program development. The resultant study framework provides the business leader with incentives and methods to develop and implement strategies for controlling and reducing total ownership cost over the entire product life cycle when balancing cost, schedule, and performance decisions.

  12. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  13. Design, construction and testing of a low-cost flat plate solar energy ...

    African Journals Online (AJOL)

    A low-cost flat plate solar energy collector has been designed and constructed with locally available materials such as mild steel and black paint of absorptance 0.94. On testing, an average daily efficiency of 55.6% was obtained. The methods are simple and illustrate the fact that construction of efficient collectors are ...

  14. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  15. Pre-fracture individual characteristics associated with high total health care costs after hip fracture.

    Science.gov (United States)

    Schousboe, J T; Paudel, M L; Taylor, B C; Kats, A M; Virnig, B A; Dowd, B E; Langsetmo, L; Ensrud, K E

    2017-03-01

    Older women with pre-fracture slow walk speed, high body mass index, and/or a high level of multimorbidity have significantly higher health care costs after hip fracture compared to those without those characteristics. Studies to investigate if targeted health care interventions for these individuals can reduce hip fracture costs are warranted. The aim of this study is to estimate the associations of individual pre-fracture characteristics with total health care costs after hip fracture, using Study of Osteoporotic Fractures (SOF) cohort data linked to Medicare claims. Our study population was 738 women age 70 and older enrolled in Medicare Fee for Service (FFS) who experienced an incident hip fracture between January 1, 1992 and December 31, 2009. We assessed pre-fracture individual characteristics at SOF study visits and estimated costs of hospitalizations, skilled nursing facility and inpatient rehabilitation stays, home health care visits, and outpatient utilization from Medicare FFS claims. We used generalized linear models to estimate the associations of predictor variables with total health care costs (2010 US dollars) after hip fracture. Median total health care costs for 1 year after hip fracture were $35,536 (inter-quartile range $24,830 to $50,903). Multivariable-adjusted total health care costs for 1 year after hip fracture were 14 % higher ($5256, 95 % CI $156 to $10,356) in those with walk speed total health care costs after hip fracture in older women. Studies to investigate if targeted health care interventions for these individuals can reduce the costs of hip fractures are warranted.

  16. Hybrid Cloud Computing Architecture Optimization by Total Cost of Ownership Criterion

    Directory of Open Access Journals (Sweden)

    Elena Valeryevna Makarenko

    2014-12-01

    Full Text Available Achieving the goals of information security is a key factor in the decision to outsource information technology and, in particular, to decide on the migration of organizational data, applications, and other resources to the infrastructure, based on cloud computing. And the key issue in the selection of optimal architecture and the subsequent migration of business applications and data to the cloud organization information environment is the question of the total cost of ownership of IT infrastructure. This paper focuses on solving the problem of minimizing the total cost of ownership cloud.

  17. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    Science.gov (United States)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  18. Modelo PEF de costes de la calidad como herramienta de gestión en empresas constructoras: una visión actual Quality costs PEF model as a management tool in construction firms: a present vision

    Directory of Open Access Journals (Sweden)

    Santos Gracia Villar

    2007-04-01

    Full Text Available Los costes de la calidad representan una herramienta de planificación de la calidad, que permite la medición de la mejora continua. Se realizó una revisión bibliográfica y discusión de las publicaciones actuales sobre los modelos genéricos de costes de la calidad. Se observó que el modelo genérico empleado con mayor frecuencia, sigue siendo el enfoque tradicional PEF (prevención, evaluación y fallos. De esta manera, se plantea este modelo en el contexto de las empresas constructoras, como herramienta de gestión de la calidad, destacando la forma en que la gestión eficaz de estos, puede reflejarse en las utilidades y productividad de dicha empresa. De igual manera, se sugiere que los costes de la calidad pueden calcularse y ser expresados en forma contable, proporcionando un parámetro en el que podemos decidir sobre los beneficios que trae su control. El objetivo de un sistema de costes de la calidad es encontrar el nivel de calidad requerido para minimizar los costes de la calidad totales, esto dará la seguridad que dicha empresa constructora esta funcionando de manera óptima con relación a sus procesos y productosThe quality costs are a quality management tool to measure the continual improvement. It was made a bibliographical revision and discussion of present publications on the generic models of quality costs. It was observed that the most frequently used generic model, continues being traditional approach PAF (prevention, appraisal and failures. So, this model was established in a construction firm context as a quality management tool, pointing out the form in that the effective management of these can be reflected in the utilities and productivity of a construction firm. Also, is suggested that quality costs can be calculated and be recorded in a countable form, providing a parameter to decide on the benefits that its control brings. The objective of a quality costs system is to find the level of quality that minimizes

  19. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  20. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  1. Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Weiren [Fermilab

    2015-04-01

    This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.

  2. Minimizing total costs of forest roads with computer-aided design ...

    Indian Academy of Sciences (India)

    imum total road costs, while conforming to design specifications, environmental ..... quality, and enhancing fish and wildlife habitat, an appropriate design ..... Soil, Water and Timber Management: Forest Engineering Solutions in Response to.

  3. Comparative cost analyses: total flow vs other power conversion systems for the Salton Sea Geothermal Resource

    Energy Technology Data Exchange (ETDEWEB)

    Wright, G.W.

    1978-09-18

    Cost studies were done for Total Flow, double flash, and multistage flash binary systems for electric Energy production from the Salton Sea Geothermal Resource. The purpose was to provide the Department of energy's Division of Geothermal Energy with information by which to judge whether to continue development of the Total Flow system. Results indicate that the Total Flow and double flash systems have capital costs of $1,135 and $1,026 /kW with energy costs of 40.9 and 39.7 mills/kW h respectively. The Total Flow and double flash systems are not distinguishable on a cost basis alone; the multistage flash binary system, with capital cost of $1,343 /kW and energy cost of 46.9 mills/kW h, is significantly more expensive. If oil savings are considered in the total analysis, the Total Flow system could save 30% more oil than the double flash system, $3.5 billion at 1978 oil prices.

  4. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  5. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  6. Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Ramsden, T.

    2013-04-01

    This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

  7. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  8. [Preliminary analysis of total cost and life quality for elder patients with femoral neck fracture].

    Science.gov (United States)

    Liu, Haonan; He, Liang; Zhang, Guilin; Gong, Xiaofeng; Li, Ning

    2015-09-01

    To analyze the total cost and life quality of the femoral neck fracture patients who received different surgery and supplement comprehensive data of osteoporotic fracture. One hundred and five patients above 60-year old who were diagnosed femoral neck fracture and received operation in Department of Orthopedics & Traumatology, Beijing Jishuitan Hospital were admitted into our study from August 2013 to December. According to the type of surgery there were 52 and 53 cases in internal fixation (IF) group and hemiarthroplasty (HA) group respectively. At first we collected the medical expense of the patients before and during hospitalization. And then the 1-year medical and non-medical expenses were collected by the cost diary ever 3 months after discharge. At the last follow-up we evaluated the life quality by the EuroQol-5 Dimensions (EQ-5D) and calculated the total cost. Outcome All the patients completed the operation successfully. No nonunion or delayed union cases in IF group, and no cases received revision surgery in both groups. The total average cost was 59 584.9 yuan including 79.1% medical cost and 20.9% non-medical cost. The primary treatment cost accounts for 84.1% of the medical cost. The cost for home care accounts for 90.7% of the non-medical care. The total and medical cost of IF group just account for 40.3% and 38.5% of the HA group and the non-medical showed no significant difference between the 2 groups (P>0.05). In addition the data of life quality and walking capability also showed no significant difference. The main cost for the femoral neck fracture is medical expense in 1-year follow-up. Both surgeries can provide satisfactory outcome, however IF may be more cost-effective compared to the HA because of the less total cost.

  9. CT image construction of a totally deflated lung using deformable model extrapolation

    International Nuclear Information System (INIS)

    Sadeghi Naini, Ali; Pierce, Greg; Lee, Ting-Yim

    2011-01-01

    Purpose: A novel technique is proposed to construct CT image of a totally deflated lung from a free-breathing 4D-CT image sequence acquired preoperatively. Such a constructed CT image is very useful in performing tumor ablative procedures such as lung brachytherapy. Tumor ablative procedures are frequently performed while the lung is totally deflated. Deflating the lung during such procedures renders preoperative images ineffective for targeting the tumor. Furthermore, the problem cannot be solved using intraoperative ultrasound (U.S.) images because U.S. images are very sensitive to small residual amount of air remaining in the deflated lung. One possible solution to address these issues is to register high quality preoperative CT images of the deflated lung with their corresponding low quality intraoperative U.S. images. However, given that such preoperative images correspond to an inflated lung, such CT images need to be processed to construct CT images pertaining to the lung's deflated state. Methods: To obtain the CT images of deflated lung, we present a novel image construction technique using extrapolated deformable registration to predict the deformation the lung undergoes during full deflation. The proposed construction technique involves estimating the lung's air volume in each preoperative image automatically in order to track the respiration phase of each 4D-CT image throughout a respiratory cycle; i.e., the technique does not need any external marker to form a respiratory signal in the process of curve fitting and extrapolation. The extrapolated deformation field is then applied on a preoperative reference image in order to construct the totally deflated lung's CT image. The technique was evaluated experimentally using ex vivo porcine lung. Results: The ex vivo lung experiments led to very encouraging results. In comparison with the CT image of the deflated lung we acquired for the purpose of validation, the constructed CT image was very similar. The

  10. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    International Nuclear Information System (INIS)

    El-Alaily, T.M.; El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M.; Assar, S.T.

    2015-01-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability

  11. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Energy Technology Data Exchange (ETDEWEB)

    El-Alaily, T.M., E-mail: toson_alaily@yahoo.com [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M. [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); Assar, S.T. [Engineering Physics and Mathematics Department, Faculty of Engineering, Tanta University, Tanta (Egypt)

    2015-07-15

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability.

  12. Reduction of Total Ownership Costs (R-TOC) Best Practices Guide

    National Research Council Canada - National Science Library

    Reed, Danny

    2003-01-01

    The purpose of the Reduction of Total Ownership Costs (R-TOC) program is to achieve readiness improvements in weapon systems by improving the reliability of the systems or the efficiency of the processes used to support...

  13. evaluation of total annual costs of heat exchanger networks using

    African Journals Online (AJOL)

    user

    after solving the first problem using RPA based heat integration gave a minimum total annual cost (TAC) of $237, ... mathematical programming and non-RPA based Hint software. ... The concept of pinch analysis evolved over the years.

  14. Construction and cost experience regarding the 2nd pool house for spent fuel storage facility in the Atucha Power Station

    International Nuclear Information System (INIS)

    Barbosa, C.A.

    1980-01-01

    The Atucha I second pool house storage for spent fuel is designed as an extension of the Atucha I power station. The two are linked by civil structure, controlling circuits, electrical and compressed air and water supplies, low level wastes disposal, ventilation under pressure maintenance, and, most important, the ability to transfer spent and new fuel in both directions. Because the second pool house is, by location and design, an extension of the existing installation, and since there is no design departure, regarding storage and transfer of fuel from that of the original installation, the rules and regulations applied for its construction were the same as those valid for the Atucha I construction. The requirement not to exceed a four-year period for construction and commissioning was determined by the need to have storage room for the Atucha I fuel. Argentina will meet the 1982 target by having the installation available during the second half of 1981. The second pool house is a wet storage location with a capacity of 1000 tons metallic uranium. It was designed by the Kraftwerk Union of West Germany along the same lines as the 440-ton storage location originally built with the station. The Atomic Energy Commission of Argentina has managed the construction and participated in project and design stages. As in the original pool, the 6 m long assemblies are stacked in double tiers. The cost figures which are mentioned differ from previously released figures and are not the final ones. With civil construction almost finished and mechanical erection started, the present estimates should not differ by more than 10% from the final figures. The installation has an investment cost of 61 million dollars, (1980), and, depending on the amortization time span considered, a total yearly cost per kg of capacity of metallic uranium, ranging between 5.5 and 9.3 dollars per kg

  15. Plan of deep underground construction for investigations on high-level radioactive waste storage

    International Nuclear Information System (INIS)

    Mayanovskij, M.S.

    1996-01-01

    The program of studies of the Japanese PNC corporation on construction of deep underground storage for high-level radioactive wastes is presented. The program is intended for 20 years. The total construction costs equal about 20 billion yen. The total cost of the project is equal to 60 billion yen. The underground part is planned to reach 1000 m depth

  16. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  17. Clinical benefit and cost effectiveness of total knee arthroplasty in the older patient

    Directory of Open Access Journals (Sweden)

    Krummenauer F

    2009-02-01

    Full Text Available Abstract Purpose Total knee arthroplasty (TKA is an effective, but also cost-intensive health care procedure for the elderly. Furthermore, bearing demographic changes in Western Europe in mind, TKA-associated financial investment for health care insurers will increase notably and thereby catalyze discussions on ressource allocation to Orthopedic surgery. To derive a quantitative rationale for such discussions within Western Europe's health care systems, a prospective assessment of both the benefit of TKA from a patient's perspective as well as its cost effectiveness from a health care insurer's perspective was implemented. Methods A prospective cost effectiveness trial recruited a total of 65 patients (60% females, who underwent TKA in 2006; median age of patients was 66 years (interquartile range 61 - 74 years. Before and three months after surgery patients were interviewed by means of the EuroQol-5D and the WOMAC questionnaires to assess their individual benefit due to TKA and the subsequent inpatient rehabilitation. Both questionnaires' benefit estimates were transformed into the number of gained quality adjusted life years [QALYs]. Total direct cost estimates for the overall care were based on German DRG and rehabilitation cost rates [€]. The primary clinical endpoint of the investigation was the individual number of QALYs gained by TKA based on the WOMAC interview; the primary health economic endpoint was the marginal cost effectiveness ratio (MCER relating the costs to the associated gain in quality of life [€/QALY]. Results Total direct costs for the overall procedure were estimed 9549 € in median. The WOMAC based interview revealed an overall gain of 4.59 QALYs (interquartile range 2.39 - 6.21 QALYs, resulting in marginal costs of 1795 €/QALY (1488 - 3288 €/QALY. The corresponding EuroQol based estimates were 2.93 QALYs (1.75 - 5.59 QALYs and 3063 €/QALY (1613 - 5291 €/QALY. Logistic regression modelling identified the

  18. Using value-based total cost of ownership (TCO) measures to inform subsystem trade-offs

    Science.gov (United States)

    Radziwill, Nicole M.; DuPlain, Ronald F.

    2010-07-01

    Total Cost of Ownership (TCO) is a metric from management accounting that helps expose both the direct and indirect costs of a business decision. However, TCO can sometimes be too simplistic for "make vs. buy" decisions (or even choosing between competing design alternatives) when value and extensibility are more critical than total cost. A three-dimensional value-based TCO, which was developed to clarify product decisions for an observatory prior to Final Design Review (FDR), will be presented in this session. This value-based approach incorporates priority of requirements, satisfiability of requirements, and cost, and can be easily applied in any environment.

  19. Cost-effectiveness of positive contrast and nuclear arthrography in patients who underwent total hip arthroplasty

    International Nuclear Information System (INIS)

    Swan, J.S.; Braunstein, E.M.; Capello, W.; Wellman, H.

    1989-01-01

    The authors have compared the cost effectiveness of contrast arthrography (CA) and nuclear arthrography (NA), in which In-111 chloride is injected with the contrast material, of total hip arthroplasties. Their series included 48 cases of surgically proved loose femoral components. The cost per true-positive result was obtained by taking the total cost of the examinations in surgically proved cases and dividing by the number of true-position cases. The cost of CA was $297 and the cost of NA was $335. For CA, the cost per true positive was $1,018, and for the NA the cost per true positive was $946. In spite of higher initial cost, NA is more cost effective than CA on a cost per true-positive case basis. NA is cost effective in evaluating hip arthroplasties in which there is suspicion of a loose femoral component

  20. En differentieret tilgang til total cost of ownership (TCO)

    DEFF Research Database (Denmark)

    Zachariassen, Frederik

    2010-01-01

    Økonomistyring er en nødvendig brik i forsøget på at kunne styre dele af eller hele forsyningskæden, og til dette bruges diverse økonomistyringsværktøjer. Denne artikel omhandler økonomistyringsværktøjet 'total cost of ownership', og hvordan dette kan bruges til at forbedre samarbejdet med...

  1. A comparative analysis of methods to represent uncertainty in estimating the cost of constructing wastewater treatment plants.

    Science.gov (United States)

    Chen, Ho-Wen; Chang, Ni-Bin

    2002-08-01

    Prediction of construction cost of wastewater treatment facilities could be influential for the economic feasibility of various levels of water pollution control programs. However, construction cost estimation is difficult to precisely evaluate in an uncertain environment and measured quantities are always burdened with different types of cost structures. Therefore, an understanding of the previous development of wastewater treatment plants and of the related construction cost structures of those facilities becomes essential for dealing with an effective regional water pollution control program. But deviations between the observed values and the estimated values are supposed to be due to measurement errors only in the conventional regression models. The inherent uncertainties of the underlying cost structure, where the human estimation is influential, are rarely explored. This paper is designed to recast a well-known problem of construction cost estimation for both domestic and industrial wastewater treatment plants via a comparative framework. Comparisons were made for three technologies of regression analyses, including the conventional least squares regression method, the fuzzy linear regression method, and the newly derived fuzzy goal regression method. The case study, incorporating a complete database with 48 domestic wastewater treatment plants and 29 industrial wastewater treatment plants being collected in Taiwan, implements such a cost estimation procedure in an uncertain environment. Given that the fuzzy structure in regression estimation may account for the inherent human complexity in cost estimation, the fuzzy goal regression method does exhibit more robust results in terms of some criteria. Moderate economy of scale exists in constructing both the domestic and industrial wastewater treatment plants. Findings indicate that the optimal size of a domestic wastewater treatment plant is approximately equivalent to 15,000 m3/day (CMD) and higher in Taiwan

  2. 48 CFR 49.305-2 - Construction contracts.

    Science.gov (United States)

    2010-10-01

    ... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's... a cost-reimbursement construction or professional services contract can be segregated into factors... depending on its importance and difficulty. The total weight value of all factors should be easily divisible...

  3. Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    White III, Chelsea C. [Georgia Tech Research Corporation, Atlanta, GA (United States); Petrovic, Bojan [Georgia Tech Research Corporation, Atlanta, GA (United States)

    2017-03-30

    Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operating supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will

  4. The Relationship between Cost Leadership Strategy, Total Quality Management Applications and Financial Performance

    Directory of Open Access Journals (Sweden)

    Ali KURT

    2016-03-01

    Full Text Available Firms need to implement some competition strategies and total quality management applications to overcome the fierce competition among others. The purpose of this study is to show the relationship between cost leadership strategy, total quality management applications and firms’ financial performance with literature review and empirical analysis. 449 questionnaires were conducted to the managers of 142 big firms. The data gathered was assessed with AMOS. As a result, the relationship between cost leadership strategy, total quality management applications and firms’ financial performance has been gathered. In addition, the relationship between TQM applications and financial performance has also been gathered.

  5. Total hip arthroplasty revision due to infection: a cost analysis approach.

    Science.gov (United States)

    Klouche, S; Sariali, E; Mamoudy, P

    2010-04-01

    The treatment of total hip arthroplasty (THA) infections is long and costly. However,the number of studies in the literature analysing the real cost of THA revision in relation to their etiology, including infection, is limited. The aim of this retrospective study was to determine the cost of revision of infected THA and to compare these costs to those of primary THA and revision of non-infected THA. We performed a retrospective cost analysis for the year 2006 using an identical analytic accounting system in each hospital department (according to internal criteria) based on allotment of direct costs and receipts for each department. From January to December 2006, 424 primary THA, 57 non-infected THA revisions and 40 THA revisions due to infection were performed. The different cost areas of the patient's treatment were identified.This included preoperative medical work-up, medicosurgical management during hospital stay,a second stay in an orthopedic rehabilitation hospital (ORH) and post-hospitalisation antibiotic therapy after revision due to infection, as well as home-based hospitalisation (HH) costs, if this was the selected alternative option. We used the national health insurance fee schedule found in the "Common classification of medical procedures" and the "General nomenclature of professional procedures" applicable in France since September 1, 2005. Hospital costs included direct costs (hospital overhead costs) and indirect costs, (medical, surgical, technical settings and net general service expenses). The calculation of HH costs and ORH costs were based on the average daily charge of these departments. The cost of primary THA was used as the reference.We then compared our surgical costs with those found for the corresponding comparable hospital stay groups (Groupes homogènes de séjour). The average hospital stay (AHS) was 7.5 +/- 1.8 days for primary THA, 8.9 +/- 2.2 days for non-infected revisions and 30.6 +/- 14.9 days for revisions due to infection

  6. Measuring the environmental costs of tidal power plant construction: A choice experiment study

    International Nuclear Information System (INIS)

    Lee, Joo-Suk; Yoo, Seung-Hoon

    2009-01-01

    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.

  7. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  8. Supplier managed inventory in the OEM supply chain : the impact of relationship types on total costs and cost distribution

    NARCIS (Netherlands)

    Nyen, van P.L.M.; Bertrand, J.W.M.; Ooijen, van H.P.G.; Vandaele, N.J.

    2009-01-01

    We investigate the impact of four variants of supplier managed inventory on total costs and cost distribution in a capital goods supply chain consisting of a parts supplier who delivers parts to an original equipment manufacturer’s assembly plant. The four supplier managed inventory variants differ

  9. Permanent magnet design for magnetic heat pumps using total cost minimization

    Science.gov (United States)

    Teyber, R.; Trevizoli, P. V.; Christiaanse, T. V.; Govindappa, P.; Niknia, I.; Rowe, A.

    2017-11-01

    The active magnetic regenerator (AMR) is an attractive technology for efficient heat pumps and cooling systems. The costs associated with a permanent magnet for near room temperature applications are a central issue which must be solved for broad market implementation. To address this problem, we present a permanent magnet topology optimization to minimize the total cost of cooling using a thermoeconomic cost-rate balance coupled with an AMR model. A genetic algorithm identifies cost-minimizing magnet topologies. For a fixed temperature span of 15 K and 4.2 kg of gadolinium, the optimal magnet configuration provides 3.3 kW of cooling power with a second law efficiency (ηII) of 0.33 using 16.3 kg of permanent magnet material.

  10. WILL THE IMPLEMENTATION OF A TOTAL QUALITY MANAGEMENT SYSTEM BENEFIT SOUTH AFRICAN CONSTRUCTION COMPANIES?

    Directory of Open Access Journals (Sweden)

    W. Joubert

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The increased levels of competition experienced in recent times in the construction sector due to globalisation and the economic downturn highlighted the need for South African construction companies to be more competitive. This paper investigates the reasons for poor quality in the South African construction industry and whether the implementation of a Total Quality Management system in this industry will improve the situation.

    AFRIKAANSE OPSOMMING: Die hoër vlakke van kompetisie wat gedurende die afgelope tydperk in die konstruksiebedryf ervaar is as gevolg van globalisering en die afswaai in die ekonomie, het die behoefte laat ontstaan dat Suid-Afrikaanse konstruksiemaatskappye meer mededingend moes raak. Hierdie artikel ondersoek die redes vir swak kwaliteit in die Suid-Afrikaanse konstruksiebedryf en of die implementering van ‘n Totale Kwaliteitsbestuurstelsel sal bydra om die situasie te verbeter.

  11. E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2014-02-01

    Full Text Available Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40. As we can easily see that 40% time and efforts are used in testing phase in traditional approach, that means we have to perform rework again if we found some bugs in testing phase. This rework is being performed after Design and code phase. This rework will increase the cost exponentially. The cleanroom software engineering methodology controls the exponential growth in cost by removing this rework. It says that "do the work correct in first attempt and move to next phase after getting the proof of correctness". This new approach minimized the rework and reduces the cost in the exponential ratio. Due to the removal of testing phase, the COCOMO (COst COnstructive MOdel used for the traditional engineering is not directly applicable in cleanroom software engineering. The traditional cost drivers used for traditional COCOMO needs to be revised. We have proposed the Extended version of COCOMO (i.e. E-COCOMO in which we have incorporated some new cost drivers. This paper explains the proposed E-COCOMO and the detailed description of proposed new cost driver.

  12. Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

    Science.gov (United States)

    Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid

    2017-10-01

    One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

  13. Cost analysis of light water reactor power plants

    International Nuclear Information System (INIS)

    Mooz, W.E.

    1978-06-01

    A statistical analysis is presented of the capital costs of light water reactor (LWR) electrical power plants. The objective is twofold: to determine what factors are statistically related to capital costs and to produce a methodology for estimating these costs. The analysis in the study is based on the time and cost data that are available on U.S. nuclear power plants. Out of a total of about 60 operating plants, useful capital-cost data were available on only 39 plants. In addition, construction-time data were available on about 65 plants, and data on completed construction permit applications were available for about 132 plants. The cost data were first systematically adjusted to constant dollars. Then multivariate regression analyses were performed by using independent variables consisting of various physical and locational characteristics of the plants. The dependent variables analyzed were the time required to obtain a construction permit, the construction time, and the capital cost

  14. Historical costs of coal-fired electricity and implications for the future

    International Nuclear Information System (INIS)

    McNerney, James; Doyne Farmer, J.; Trancik, Jessika E.

    2011-01-01

    We study the cost of coal-fired electricity in the United States between 1882 and 2006 by decomposing it in terms of the price of coal, transportation cost, energy density, thermal efficiency, plant construction cost, interest rate, capacity factor, and operations and maintenance cost. The dominant determinants of cost have been the price of coal and plant construction cost. The price of coal appears to fluctuate more or less randomly while the construction cost follows long-term trends, decreasing from 1902 to 1970, increasing from 1970 to 1990, and leveling off since then. Our analysis emphasizes the importance of using long time series and comparing electricity generation technologies using decomposed total costs, rather than costs of single components like capital. By taking this approach we find that the history of coal-fired electricity suggests there is a fluctuating floor to its future costs, which is determined by coal prices. Even if construction costs resumed a decreasing trend, the cost of coal-based electricity would drop for a while but eventually be determined by the price of coal, which fluctuates while showing no long-term trend. - Research highlights: → 125-year history highlights the dominant determinants of coal-fired electricity costs. → Results suggest a fluctuating floor to future costs, determined by coal prices. → Analysis emphasizes importance of comparing technologies using decomposed total costs.

  15. Energy use for building construction. Final report, March 1, 1976--December 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Hannon, B M; Stein, R G; Segal, B; Serber, D; Stein, C

    1976-12-01

    Total (direct and indirect) energy requirements of the construction industry for 1967 were determined in order to examine the potential for energy savings. The Energy Input/Output Model developed at the Center for Advanced Computation, University of Illinois, was expanded to include 49 building and non-building construction sectors (new and maintenance). Total energy intensities were determined for these sectors, as well as energy requirements to final demand. Overall, the construction industry required about 6000 trillion Btu, or about 9% of the total U. S. energy requirement in 1967. About 20% of this requirement was for direct energy. Energy requirements were further broken down according to goods and services purchased by individual construction sectors, and energy distribution patterns were determined within each construction sector. Energy cost per unit for various building materials were calculated, as well as 1967 energy cost per square foot for building sectors. Laboratories required the most energy per square foot (2,074,056 Btu/SF), while Farm Service required the least (149,071 Btu/SF). Comparative interchangeable building assemblies were evaluated for their energy costs, including initial construction and lifetime maintenance energy. Tradeoffs between construction and operational energy costs were determined for a selected wall frame assembly with different exterior finishes and varying degrees of insulation. A study was initiated to determine industries in which direct energy use led to a significant amount of the energy embodied in New Building Construction for 1967. The resulting Energy Flow Chart is included.

  16. 36 CFR 223.41 - Payment when purchaser elects government road construction.

    Science.gov (United States)

    2010-07-01

    ... government road construction. 223.41 Section 223.41 Parks, Forests, and Public Property FOREST SERVICE... Conditions and Provisions § 223.41 Payment when purchaser elects government road construction. Each contract having a provision for construction of specified roads with total estimated construction costs of $50,000...

  17. Cost reduction of LWRs - The main features

    International Nuclear Information System (INIS)

    Board, J.A.; Norman, D.

    1991-01-01

    For effective generation cost reductions to be achieved while maintaining safety levels, the impact of each of the above element and their interactions must be fully assessed, together with the effects of uncertainty on commercial risk. the amount of interest during construction which must be paid can be minimised by adopting designs, output ratings (unit size), and construction methods which minimise construction time. However this must be done without unduly increasing specific capital cost. Total capital costs can be reduced by sharing design and project launching costs and front-end design and licensing costs, across a series of identical plants. The paper is reviewing costs and performance factors such as those above with the aim of identifying the strategies which might be necessary within and between countries in order to create an environment which would enable cost reductions on LWRs to be made. (author)

  18. Budget performance reporting and construction work packaging

    International Nuclear Information System (INIS)

    Strong, M.G.; Weyers, L.L.

    1976-01-01

    A changing financial, technological, and regulatory environment has increased the complexity, costliness, and risk involved in constructing new generating facilities. A primary challenge facing utility executives is to hold down costs on these construction projects. New construction management techniques are required to accomplish this. Commonwealth Edison has responded by implementing a new Budget Performance Reporting System and a Construction Work Packaging System. The new systems are being used successfully on four major construction projects with budgets totaling over $4 billion

  19. evaluation of total annual costs of heat exchanger networks using

    African Journals Online (AJOL)

    This study presents pinch analysis of some heat exchanger networks (HENs) problems using Hint integration (HINT) software. Three examples reported to have been solved using different approaches by various researchers to obtain the least possible total annual cost (TAC) were solved using the Hint software. In this work ...

  20. Total cost estimates for large-scale wind scenarios in UK

    International Nuclear Information System (INIS)

    Dale, Lewis; Milborrow, David; Slark, Richard; Strbac, Goran

    2004-01-01

    The recent UK Energy White Paper suggested that the Government should aim to secure 20% of electricity from renewable sources by 2020. A number of estimates of the extra cost of such a commitment have been made, but these have not necessarily included all the relevant cost components. This analysis sets out to identify these and to calculate the extra cost to the electricity consumer, assuming all the renewable electricity is sourced from wind energy. This enables one of the more controversial issues--the implications of wind intermittency--to be addressed. The basis of the assumptions associated with generating costs, extra balancing costs and distribution and transmission system reinforcement costs are all clearly identified and the total costs of a '20% wind' scenario are compared with a scenario where a similar amount of energy is generated by gas-fired plant. This enables the extra costs of the renewables scenario to be determined. The central estimate of the extra costs to electricity consumers is just over 0.3 p/kW h in current prices (around 5% extra on average domestic unit prices). Sensitivity analyses examine the implications of differing assumptions. The extra cost would rise if the capital costs of wind generation fall slower than anticipated, but would fall if gas prices rise more rapidly than has been assumed, or if wind plant are more productive. Even if it is assumed that wind has no capacity displacement value, the added cost to the electricity consumer rises by less than 0.1 p/kW h. It is concluded that there does not appear to be any technical reason why a substantial proportion of the country's electricity requirements could not be delivered by wind

  1. Impact Of Health Care Delivery System Innovations On Total Cost Of Care.

    Science.gov (United States)

    Smith, Kevin W; Bir, Anupa; Freeman, Nikki L B; Koethe, Benjamin C; Cohen, Julia; Day, Timothy J

    2017-03-01

    Using delivery system innovations to advance health care reform continues to be of widespread interest. However, it is difficult to generalize about the success of specific types of innovations, since they have been examined in only a few studies. To gain a broader perspective, we analyzed the results of forty-three ambulatory care programs funded by the first round of the Center for Medicare and Medicaid Innovation's Health Care Innovations Awards. The innovations' impacts on total cost of care were estimated by independent evaluators using multivariable difference-in-differences models. Through the first two years, most of the innovations did not show a significant effect on total cost of care. Using meta-regression, we assessed the effects on costs of five common components of these innovations. Innovations that used health information technology or community health workers achieved the greatest cost savings. Savings were also relatively large in programs that targeted clinically fragile patients-clinically complex populations at risk for disease progression. While the magnitude of these effects was often substantial, none achieved conventional levels of significance in our analyses. Meta-analyses of a larger number of delivery system innovations are needed to more clearly establish their potential for patient care cost savings. Project HOPE—The People-to-People Health Foundation, Inc.

  2. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  3. The adoption of total cost of ownership for sourcing decisions - a structural equations analysis

    NARCIS (Netherlands)

    Wouters, Marc; Anderson, James C.; Wynstra, Finn

    2005-01-01

    This study investigates the adoption of total cost of ownership (TCO) analysis to improve sourcing decisions. TCO can be seen as an application of activity based costing (ABC) that quantifies the costs that are involved in acquiring and using purchased goods or services. TCO supports purchasing

  4. Applying total interpretive structural modeling to study factors affecting construction labour productivity

    Directory of Open Access Journals (Sweden)

    Sayali Shrikrishna Sandbhor

    2014-03-01

    Full Text Available Construction sector has always been dependent on manpower. Most of the activities carried out on any construction site are labour intensive. Since productivity of any project depends directly on productivity of labour, it is a prime responsibility of the employer to enhance labour productivity. Measures to improve the same depend on analysis of positive and negative factors affecting productivity. Major attention should be given to factors that decrease the productivity of labour. Factor analysis thus is an integral part of any study aiming to improve productivity.  Interpretive structural modeling is a methodology for identifying and summarizing relationships among factors which define an issue or problem. It provides a means to arrange the factors in an order as per their complexity. This study attempts to use the latest version of interpretive structural modeling i.e. total interpretive structural modeling to analyze factors negatively affecting construction labour productivity. It establishes interpretive relationship among these factors facilitating improvement in the overall productivity of construction site.

  5. Construction cost prediction model for conventional and sustainable college buildings in North America

    Directory of Open Access Journals (Sweden)

    Othman Subhi Alshamrani

    2017-03-01

    Full Text Available The literature lacks in initial cost prediction models for college buildings, especially comparing costs of sustainable and conventional buildings. A multi-regression model was developed for conceptual initial cost estimation of conventional and sustainable college buildings in North America. RS Means was used to estimate the national average of construction costs for 2014, which was subsequently utilized to develop the model. The model could predict the initial cost per square feet with two structure types made of steel and concrete. The other predictor variables were building area, number of floors and floor height. The model was developed in three major stages, such as preliminary diagnostics on data quality, model development and validation. The developed model was successfully tested and validated with real-time data.

  6. Primary vs Conversion Total Hip Arthroplasty: A Cost Analysis

    Science.gov (United States)

    Chin, Garwin; Wright, David J.; Snir, Nimrod; Schwarzkopf, Ran

    2018-01-01

    Introduction Increasing hip fracture incidence in the United States is leading to higher occurrences of conversion total hip arthroplasty (THA) for failed surgical treatment of the hip. In spite of studies showing higher complication rates in conversion THA, the Centers for Medicare and Medicaid services currently bundles conversion and primary THA under the same diagnosis-related group. We examined the cost of treatment of conversion THA compared with primary THA. Our hypothesis is that conversion THA will have higher cost and resource use than primary THA. Methods Fifty-one consecutive conversion THA patients (Current Procedure Terminology code 27132) and 105 matched primary THA patients (Current Procedure Terminology code 27130) were included in this study. The natural log-transformed costs for conversion and primary THA were compared using regression analysis. Age, gender, body mass index, American Society of Anesthesiologist, Charlson comorbidity score, and smoker status were controlled in the analysis. Conversion THA subgroups formed based on etiology were compared using analysis of variance analysis. Results Conversion and primary THAs were determined to be significantly different (P conversion THA has significantly greater cost and resource use than primary THA. In order to prevent disincentives for treating these complex surgical patients, reclassification of conversion THA is needed, as they do not fit together with primary THA. PMID:26387923

  7. Internal Logistics System Selection with Total Cost of Ownership Analysis

    Science.gov (United States)

    Araújo, Inês; Pimentel, Carina; Godina, Radu; Matias, João C. O.

    2017-06-01

    In this paper a methodology was followed in order to support the decision-making of one industrial unit regarding its internal logistics system. The addressed factory was facing issues with their internal logistics approach. Some alternatives were pointed out and a proper total cost of ownership (TCO) analysis was developed. This analysis was taken in order to demonstrate the more cost-effective solution for the internal logistics system. This tool is more and more valued by the companies, due to their willing to reduce the costs that are associated with the way of doing business. Despite the proposal of the best choice for the internal logistics system of the enterprise, this study also intends to present some conclusions about the match between the nature of the industrial unit and the logistics systems that best fit the requirements of those.

  8. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  9. Comparative evaluation of low cost materials as constructed wetland filling media

    Science.gov (United States)

    Pinho, Henrique J. O.; Vaz, Mafalda M.; Mateus, Dina M. R.

    2017-11-01

    Three waste materials from civil construction activities were assessed as low cost alternative filling materials used in Constructed Wetlands (CW). CW are green processes for wastewater treatment, whose design includes an appropriate selection of vegetation and filling material. The sustainability of such processes may be incremented using recovered wastes as filling materials. The abilities of the materials to support plant growth and to contribute to pollutants removal from wastewater were assessed and compared to expanded clay, a filling usually used in CW design. Statistical analysis, using one-way ANOVA and Welch's ANOVA, demonstrate that limestone fragments are a better choice of filling material than brick fragments and basalt gravel.

  10. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  11. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games

    Directory of Open Access Journals (Sweden)

    Jiacai Liu

    2016-11-01

    Full Text Available There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  12. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games.

    Science.gov (United States)

    Liu, Jiacai; Zhao, Wenjian

    2016-11-08

    There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  13. Time-driven activity based costing of total knee replacement surgery at a London teaching hospital.

    Science.gov (United States)

    Chen, Alvin; Sabharwal, Sanjeeve; Akhtar, Kashif; Makaram, Navnit; Gupte, Chinmay M

    2015-12-01

    The aim of this study was to conduct a time-driven activity based costing (TDABC) analysis of the clinical pathway for total knee replacement (TKR) and to determine where the major cost drivers lay. The in-patient pathway was prospectively mapped utilising a TDABC model, following 20 TKRs. The mean age for these patients was 73.4 years. All patients were ASA grade I or II and their mean BMI was 30.4. The 14 varus knees had a mean deformity of 5.32° and the six valgus knee had a mean deformity of 10.83°. Timings were prospectively collected as each patient was followed through the TKR pathway. Pre-operative costs including pre-assessment and joint school were £ 163. Total staff costs for admission and the operating theatre were £ 658. Consumables cost for the operating theatre were £ 1862. The average length of stay was 5.25 days at a total cost of £ 910. Trust overheads contributed £ 1651. The overall institutional cost of a 'noncomplex' TKR in patients without substantial medical co-morbidities was estimated to be £ 5422, representing a profit of £ 1065 based on a best practice tariff of £ 6487. The major cost drivers in the TKR pathway were determined to be theatre consumables, corporate overheads, overall ward cost and operating theatre staffing costs. Appropriate discounting of implant costs, reduction in length of stay by adopting an enhanced recovery programme and control of corporate overheads through the use of elective orthopaedic treatment centres are proposed approaches for reducing the overall cost of treatment. Copyright © 2015 Elsevier B.V. All rights reserved.

  14. Cost of Radiotherapy Versus NSAID Administration for Prevention of Heterotopic Ossification After Total Hip Arthroplasty

    International Nuclear Information System (INIS)

    Strauss, Jonathan B.; Chen, Sea S.; Shah, Anand P.; Coon, Alan B.; Dickler, Adam

    2008-01-01

    Purpose: Heterotopic ossification (HO), or abnormal bone formation, is a common sequela of total hip arthroplasty. This abnormal bone can impair joint function and must be surgically removed to restore mobility. HO can be prevented by postoperative nonsteroidal anti-inflammatory drug (NSAID) use or radiotherapy (RT). NSAIDs are associated with multiple toxicities, including gastrointestinal bleeding. Although RT has been shown to be more efficacious than NSAIDs at preventing HO, its cost-effectiveness has been questioned. Methods and Materials: We performed an analysis of the cost of postoperative RT to the hip compared with NSAID administration, taking into account the costs of surgery for HO formation, treatment-induced morbidity, and productivity loss from missed work. The costs of RT, surgical revision, and treatment of gastrointestinal bleeding were estimated using the 2007 Medicare Fee Schedule and inpatient diagnosis-related group codes. The cost of lost wages was estimated using the 2006 median salary data from the U.S. Census Bureau. Results: The cost of administering RT was estimated at $899 vs. $20 for NSAID use. After accounting for the additional costs associated with revision total hip arthroplasty and gastrointestinal bleeding, the corresponding estimated costs were $1,208 vs. $930. Conclusion: If the costs associated with treatment failure and treatment-induced morbidity are considered, the cost of NSAIDs approaches that of RT. Other NSAID morbidities and quality-of-life differences that are difficult to quantify add to the cost of NSAIDs. These considerations have led us to recommend RT as the preferred modality for use in prophylaxis against HO after total hip arthroplasty, even when the cost is considered

  15. Capital-cost behavior: is nuclear different

    International Nuclear Information System (INIS)

    Lotze, C.D.; Riordan, B.J.

    1978-01-01

    The capital costs of coal-fired and nuclear power plants are found to be comparable when costs for pollution control are included. Trends in capital costs reveal a similar rate gain that retains the same economic balance. Graphs of selected cost indices are used to show that the rapid increase in direct construction costs is not unique to nuclear plants, those of hydroelectric plants as well as coal-fired having the same pattern. Comparisons of indirect capital costs, based on analyses of direct capital and total capital costs, show estimated average growth rates of total costs to be 14% for coal and 13.6% for nuclear, while direct cost growth rates are 10.2% and 10.4%. The economics of market competition can be expected to push alternative energy source projects into balance

  16. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  17. Time-based analysis of total cost of patient episodes: a case study of hip replacement.

    Science.gov (United States)

    Peltokorpi, Antti; Kujala, Jaakko

    2006-01-01

    Healthcare in the public and private sectors is facing increasing pressure to become more cost-effective. Time-based competition and work-in-progress have been used successfully to measure and improve the efficiency of industrial manufacturing. Seeks to address this issue. Presents a framework for time based management of the total cost of a patient episode and apply it to the six sigma DMAIC-process development approach. The framework is used to analyse hip replacement patient episodes in Päijät-Häme Hospital District in Finland, which has a catchment area of 210,000 inhabitants and performs an average of 230 hip replacements per year. The work-in-progress concept is applicable to healthcare--notably that the DMAIC-process development approach can be used to analyse the total cost of patient episodes. Concludes that a framework, which combines the patient-in-process and the DMAIC development approach, can be used not only to analyse the total cost of patient episode but also to improve patient process efficiency. Presents a framework that combines patient-in-process and DMAIC-process development approaches, which can be used to analyse the total cost of a patient episode in order to improve patient process efficiency.

  18. 12 CFR Appendix K to Part 226 - Total Annual Loan Cost Rate Computations for Reverse Mortgage Transactions

    Science.gov (United States)

    2010-01-01

    ... Appendix K to Part 226—Total Annual Loan Cost Rate Computations for Reverse Mortgage Transactions (a... loan cost rate for various transactions, as well as instructions, explanations, and examples for.... (2) Term of the transaction. For purposes of total annual loan cost disclosures, the term of a...

  19. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    Science.gov (United States)

    2013-03-01

    construction firms ( Molenaar et al. 1999). The design-build+ method is a form of DB which brings the contractor into the planning phase early to help...of firm fixed prices requires the contractor to commit to a set price early in the design process ( Molenaar et al. 1999). Both firm fixed and cost...Research The performance of MILCON projects based on execution method has been investigated in terms of cost, performance, and schedule. Molenaar

  20. Preliminary estimates of the total-system cost for the restructured program: An addendum to the May 1989 analysis of the total-system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1990-12-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 - a fee levied on electricity generated and sold by commercial nuclear power plants - is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee. The costs contained in this report represent a preliminary analysis of the cost impacts associated with the Secretary of Energy's Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program issued in November 1989. The major elements of the restructured program announced in this report which pertain to the program's life-cycle costs are: a prioritization of the scientific investigations program at the Yucca Mountain candidate site to focus on identification of potentially adverse conditions, a delay in the start of repository operations until 2010, the start of limited waste acceptance at the monitored retrievable storage (MRS) facility in 1998, and the start of waste acceptance at the full-capability MRS facility in 2,000. Based on the restructured program, the total-system cost for the system with a repository at the candidate site at Yucca Mountain in Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $26 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $34 to $35 billion, depending on the quantity of spent fuel and high-level waste (HLW) requiring disposal. 17 figs., 17 tabs

  1. Historical plant cost and annual production expenses for selected electric plants, 1982

    International Nuclear Information System (INIS)

    1984-01-01

    This publication is a composite of the two prior publications, Hydroelectric Plant Construction Cost and Annual Production Expenses and Thermal-Electric Plant Construction Cost and Annual Production Expenses. Beginning in 1979, Thermal-Electric Plant Construction Cost and Annual Production Expenses contained information on both steam-electric and gas-turbine electric plant construction cost and annual production expenses. The summarized historical plant cost described under Historical Plant Cost in this report is the net cumulative-to-date actual outlays or expenditures for land, structures, and equipment to the utility. Historical plant cost is the initial investment in plant (cumulative to the date of initial commercial operation) plus the costs of all additions to the plant, less the value of retirements. Thus, historical plant cost includes expenditures made over several years, as modifications are made to the plant. Power Production Expenses is the reporting year's plant operation and maintenance expenses, including fuel expenses. These expenses do not include annual fixed charges on plant cost (capital costs) such as interest on debt, depreciation or amortization expenses, and taxes. Consequently, total production expenses and the derived unit costs are not the total cost of producing electric power at the various plants. This publication contains data on installed generating capacity, net generation, net capability, historical plant cost, production expenses, fuel consumption, physical and operating plant characteristics, and other relevant statistical information for selected plants

  2. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  3. Total inpatient treatment costs in patients with severe burns: towards a more accurate reimbursement model.

    Science.gov (United States)

    Mehra, Tarun; Koljonen, Virve; Seifert, Burkhardt; Volbracht, Jörk; Giovanoli, Pietro; Plock, Jan; Moos, Rudolf Maria

    2015-01-01

    Reimbursement systems have difficulties depicting the actual cost of burn treatment, leaving care providers with a significant financial burden. Our aim was to establish a simple and accurate reimbursement model compatible with prospective payment systems. A total of 370 966 electronic medical records of patients discharged in 2012 to 2013 from Swiss university hospitals were reviewed. A total of 828 cases of burns including 109 cases of severe burns were retained. Costs, revenues and earnings for severe and nonsevere burns were analysed and a linear regression model predicting total inpatient treatment costs was established. The median total costs per case for severe burns was tenfold higher than for nonsevere burns (179 949 CHF [167 353 EUR] vs 11 312 CHF [10 520 EUR], interquartile ranges 96 782-328 618 CHF vs 4 874-27 783 CHF, p <0.001). The median of earnings per case for nonsevere burns was 588 CHF (547 EUR) (interquartile range -6 720 - 5 354 CHF) whereas severe burns incurred a large financial loss to care providers, with median earnings of -33 178 CHF (30 856 EUR) (interquartile range -95 533 - 23 662 CHF). Differences were highly significant (p <0.001). Our linear regression model predicting total costs per case with length of stay (LOS) as independent variable had an adjusted R2 of 0.67 (p <0.001 for LOS). Severe burns are systematically underfunded within the Swiss reimbursement system. Flat-rate DRG-based refunds poorly reflect the actual treatment costs. In conclusion, we suggest a reimbursement model based on a per diem rate for treatment of severe burns.

  4. Monitoring and Controlling Engineering and Construction Management Cost Performance Within the Corps of Engineers

    Science.gov (United States)

    1988-12-01

    COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type

  5. Cost-effectivness analysis of total thyroidectomy vs radioiodine for Graves disease

    Directory of Open Access Journals (Sweden)

    Prokić Anđelka

    2013-01-01

    Full Text Available Among the patients suffering from hyperthyroidism 60-80% have Graves' disease. The initial therapy of Graves's disease are antithyroid drugs. If the remission is not achieved after 12-18 months, the patients should be directed to surgical treatment or to the therapy with radioactive iodine. The aim of this study was to compare cost/effectiveness ratios for radioactive iodine and total thyroidectomy. The analysis was made using Markov model, from the perspective of Republic Fund for Health Insurance in Serbia. Duration of one cycle in the model is six months, and the time horizon is 30 years. Monte Carlo simulation was performed for 1000 virtual patients as well as the analysis of sensitivity with the variation of parameters ± 50%. For total thyroidectomy the insurance should provide 138.389,72 RSD / 57, 83 QALY i.e. 2.393,04 dinars for one quality-adjusted life year, and for radioactive iodine the insurance should provide 110.043,64 RSD / 57,82 QALY i.e. 1.903,37 dinars for one quality-adjusted life year. This economic analysis showed that radioactive iodine has better ratio of costs to clinical effectiveness as opposed to total thyroidectomy.

  6. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1989-05-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 -- a fee levied on electricity generated in commercial nuclear power plants -- is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee and is consistent with the program strategy and plans contained in the DOE's Draft 1988 Mission Plan Amendment. The total-system cost for the system with a repository at Yucca Mountain, Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $24 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $31 to $33 billion, depending on the quantity of spent fuel to be disposed of. The $7 billion cost savings for the single-repository system in comparison with the two-repository system is due to the elimination of $3 billion for second-repository development and $7 billion for the second-repository facility. These savings are offset by $2 billion in additional costs at the first repository and $1 billion in combined higher costs for the MRS facility and transportation. 55 refs., 2 figs., 24 tabs

  7. The construction of distant total distributed measuring and controlling system based on RS-232 communication

    International Nuclear Information System (INIS)

    Shi Chengying; Li Tiantuo; Zhu Wenkai; Zhang Quanhu

    1999-01-01

    The author discusses the construction of distant total distributed measuring and controlling system based on RS-232 communication. The merits of this system are simple construction, reliable performance, big communication distance, and wide covering range. The system fits in with application in radiation environment. The author also discusses the system's hardware equipment and communication protocol

  8. Making Hay When It Rains: The Effect Prevailing Wage Regulations, Scale Economies, Seasonal, Cyclical and Local Business Patterns Have On School Construction Costs.

    Science.gov (United States)

    Azari-Rad, Hamid; Philips, Peter; Prus, Mark

    2002-01-01

    Examines several alternative ways for school districts to reduce the construction costs of new facilities. Finds that spacing out the start of facility construction projects and building during economic downturns in the construction industry offer the best options for construction cost savings. (PKP)

  9. Total cost of ownership in the services sector: A case study

    NARCIS (Netherlands)

    K. Hurkens (Krisje); W. van der Valk (Wendy); J.Y.F. Wynstra (Finn)

    2006-01-01

    textabstractFew detailed studies exist of the trade-offs to be made when developing a comprehensive, strategically focused total cost of ownership (TCO) model. Moreover, most studies of TCO have been conducted in manufacturing firms, with little or no TCO research directed toward service

  10. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  11. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  12. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  13. SUBSTANTIATION OF THE COST OF HOUSING CONSTRUCTION INCLUDING THE FACTOR OF INVESTMENT ATTRACTIVENESS OF TERRITORIES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-11-01

    Full Text Available Problem statement. For planning and organization of urban construction is necessary to analyze the use of areas. Territorial resources of the city, being used for construction and other urban purposes, consists of plots of land: disposable, reserved and undeveloped in previous years of construction in progress; residential districts and blocks of obsolete housing fund; industrial and municipal and warehouse enterprises being used irrationally or stopped to work; the defence department, where the amortized warehouses and other main funds are that are not used by purpose; agricultural enterprises where the obsolete industrial funds, haying, nurseries, greenhouses. The number of free areas suitable for future urban development is extremely limited. However a considerable part of the territories of almost all functional zones is used inefficiently. Purpose. Formalization of a factor of investment attractiveness of territories for the further identification and research of the connection between it and the cost of housing construction is necessary. Conclusion. The identification of regularities of influence of the factor of investment attractiveness of territories on the cost of construction of high-rise buildings allow to obtain a quantitative estimate of this effect and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the implementation of highrise construction projects, based on organizational and technological aspects.

  14. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Science.gov (United States)

    El-Alaily, T. M.; El-Nimr, M. K.; Saafan, S. A.; Kamel, M. M.; Meaz, T. M.; Assar, S. T.

    2015-07-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability.

  15. The total lifetime costs of smoking

    DEFF Research Database (Denmark)

    Rasmussen, S.R.; Prescott, E.; Sørensen, T.I.A.

    2004-01-01

    Net costs of smoking in a lifetime perspective and, hence, the economic interests in antismoking policies have been questioned. It has been proposed that the health-related costs of smoking are balanced by smaller expenditure due to shorter life expectancy.......Net costs of smoking in a lifetime perspective and, hence, the economic interests in antismoking policies have been questioned. It has been proposed that the health-related costs of smoking are balanced by smaller expenditure due to shorter life expectancy....

  16. An economic analysis of the effects of regulatory delay on nuclear power plant construction. Technical report

    International Nuclear Information System (INIS)

    Maloney, M.T.; Walsh, M.D.

    1980-08-01

    In order to evaluate the impact that any government regulation has on society, an accurate measure of the costs imposed by the regulation is essential. Current government estimates of the cost of pollution control legislation have failed to include the costs of project delays that firms may experience when complying with such standards. Clearly, if these delays are the direct result of such legislation their costs should be included for a proper evaluation. The purpose of this report is to define and measure the true impact that construction deals have on the total project costs of a specific industry. The Nuclear Power Industry has been chosen to illustrate the problem. First, the industry is examined in terms of its economic and physical environment. A model is then developed to deal with the costs involved in the construction of a typical nuclear plant. The model is tested by regressing time and cost data of 31 completed plants to determine the impact that unanticipated delays have had on total project costs. These results indicate that such delays would increase the total project costs of a typical 1,000 mw plant by .8 percent per month in the initial stage of the project and 1.1 percent per month after actual construction begins

  17. Simulation of tunneling construction methods of the Cisumdawu toll road

    Science.gov (United States)

    Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.

    2017-11-01

    Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.

  18. Cost viability of 3D printed house in UK

    Science.gov (United States)

    Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.

    2018-03-01

    UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.

  19. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  20. Construction risks of nuclear power plants for use in cost-effectiveness considerations

    International Nuclear Information System (INIS)

    Bock-Werthmann, W.

    1986-08-01

    The construction risk study is concerned with a nuclear power station of 1300 MW(e) design output. The risk figures obtained demonstrate that construction risks of nuclear power plants form a substantial share of the total risk from all steps of the nuclear fuel cycle. When compared with other risk figures it is apparent that only the fatalities caused by the extraction of uranium are of similar magnitude. (55 references). (DG)

  1. Theoretical and methodological aspects of assessing economic effectiveness of nuclear power plant construction using cost-benefit analysis

    International Nuclear Information System (INIS)

    Moravcik, A.

    1984-01-01

    The cost benefit of investments is devided into social and economic benefits. The postulates are discussed for the assessment of the cost benefit of capital costs of nuclear power plants. The relations are given for total cost benefit of capital costs expressed by the total profit rate of capital costs, and the absolute effectiveness exoressed by the socio-economic benefit of capital costs. The absolute cost benefit of capital costs is characterized by several complex indexes. Comparable capital cost benefit is used for assessing the effectiveness of interchangeable variants of solution. The minimum calculated costs serve as the criterion for selecting the optimal variant. (E.S.)

  2. Self-reported Function, Health Resource Use, and Total Health Care Costs Among Medicare Beneficiaries With Glaucoma.

    Science.gov (United States)

    Prager, Alisa J; Liebmann, Jeffrey M; Cioffi, George A; Blumberg, Dana M

    2016-04-01

    The effect of glaucoma on nonglaucomatous medical conditions and resultant secondary health care costs is not well understood. To assess self-reported medical conditions, the use of medical services, and total health care costs among Medicare beneficiaries with glaucoma. Longitudinal observational study of 72,587 Medicare beneficiaries in the general community using the Medicare Current Beneficiary Survey (2004-2009). Coding to extract data started in January 2015, and analyses were performed between May and July 2015. Self-reported health, the use of health care services, adjusted mean annual total health care costs per person, and adjusted mean annual nonoutpatient costs per person. Participants were 72,587 Medicare beneficiaries 65 years or older with (n = 4441) and without (n = 68,146) a glaucoma diagnosis in the year before collection of survey data. Their mean age was 76.9 years, and 43.2% were male. Patients with glaucoma who responded to survey questions on visual disability were stratified into those with (n = 1748) and without (n = 2639) self-reported visual disability. Medicare beneficiaries with glaucoma had higher adjusted odds of inpatient hospitalizations (odds ratio [OR], 1.27; 95% CI, 1.17-1.39; P total health care costs and $2599 (95% CI, $1985-$3212; P total and nonoutpatient medical costs. Perception of vision loss among patients with glaucoma may be associated with depression, falls, and difficulty walking. Reducing the prevalence and severity of glaucoma may result in improvements in associated nonglaucomatous medical conditions and resultant reduction in health care costs.

  3. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    Science.gov (United States)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  4. A METHOD OF THE MINIMIZING OF THE TOTAL ACQUISITIONS COST WITH THE INCREASING VARIABLE DEMAND

    Directory of Open Access Journals (Sweden)

    ELEONORA IONELA FOCȘAN

    2015-12-01

    Full Text Available Over time, mankind has tried to find different ways of costs reduction. This subject which we are facing more often nowadays, has been detailed studied, without reaching a general model, and also efficient, regarding the costs reduction. Costs reduction entails a number of benefits over the entity, the most important being: increase revenue and default to the profit, increase productivity, a higher level of services / products offered to clients, and last but not least, the risk mitigation of the economic deficit. Therefore, each entity search different modes to obtain most benefits, for the company to succeed in a competitive market. This article supports the companies, trying to make known a new way of minimizing the total cost of acquisitions, by presenting some hypotheses about the increasing variable demand, proving them, and development of formulas for reducing the costs. The hypotheses presented in the model described below, can be maximally exploited to obtain new models of reducing the total cost, according to the modes of the purchase of entities which approach it.

  5. Open-source digital technologies for low-cost monitoring of historical constructions

    OpenAIRE

    Basto, Camilo; Pelà, Luca; Chacón Flores, Rolando Antonio

    2017-01-01

    This paper shows new possibilities of using novel, open-source, low-cost platforms for the structural health monitoring of heritage structures. The objective of the study is to present an assessment of increasingly available open-source digital modeling and fabrication technologies in order to identify the suitable counterparts of the typical components of a continuous static monitoring system for a historical construction. The results of the research include a simple case-study, which is pre...

  6. The true costs of nuclear power

    International Nuclear Information System (INIS)

    Wallner, A.; Mraz, G.

    2013-01-01

    Worldwide, many nuclear power plants will be reaching the end of their lifetimes over the next few years. States must therefore decide now on the direction they intend to steer their energy policies. Possible options are the construction of new nuclear power plants, extending the lifetime of existing ones, or changing direction towards a sustainable energy future. Arguments put forward by the nuclear power lobby in favour of new builds are, on the one hand, the claim that nuclear power is low in CO2 emissions,1and on the other, that it is low cost. This paper examines the second claim and identifies the “true costs of nuclear power”. This paper provides an overview for the general reader and presents the most important aspects of “costs of nuclear power”, as well as sound information to contribute to discussions of this complex issue. The first part of this paper focuses on the costs of nuclear new-build: Approximately two thirds of electricity generation costs consist of fixed costs, the largest part of which covers the construction of the nuclear power plant (NPP) itself, including the interest rates (capital costs). Consequently, construction costs are a crucial factor in the overall cost of nuclear power. The issue of nuclear new build is currently under discussion in many states in Europe which are considering replacing their aged nuclear power plant fleet, e.g. UK (Hinkley Point and further plans for new builds), Finland (Olkiluoto 3), France (Flamanville 3), the Czech Republic (Temelin 3/4), Slovakia (Mochovce 3/4) and Romania (Cernavoda 3/4). Those projects have one crucial point in common: problems with costs or financing. The Massachusetts Institute of Technology (MIT) has calculated that construction costs rose 15% per annum from 2003 to 2009; construction costs rose from 2,000 to 4,000 USD, amounting to total construction costs of US$ 4 billion for a 1,000 MW NPP. A current example of cost and construction time overrun is the Finnish reactor

  7. Efforts to Support Consumer Enrollment Decisions Using Total Cost Estimators: Lessons from the Affordable Care Act’s Marketplaces.

    Science.gov (United States)

    Giovannelli, Justin; Curran, Emily

    2017-02-01

    Issue: Policymakers have sought to improve the shopping experience on the Affordable Care Act’s marketplaces by offering decision support tools that help consumers better understand and compare their health plan options. Cost estimators are one such tool. They are designed to provide consumers a personalized estimate of the total cost--premium, minus subsidy, plus cost-sharing--of their coverage options. Cost estimators were available in most states by the start of the fourth open enrollment period. Goal: To understand the experiences of marketplaces that offer a total cost estimator and the interests and concerns of policymakers from states that are not using them. Methods: Structured interviews with marketplace officials, consumer enrollment assisters, technology vendors, and subject matter experts; analysis of the total cost estimators available on the marketplaces as of October 2016. Key findings and conclusions: Informants strongly supported marketplace adoption of a total cost estimator. Marketplaces that offer an estimator faced a range of design choices and varied significantly in their approaches to resolving them. Interviews suggested a clear need for additional consumer testing and data analysis of tool usage and for sustained outreach to enrollment assisters to encourage greater use of the estimators.

  8. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  9. Cemented total hip replacement cable debris and acetabular construct durability.

    Science.gov (United States)

    Altenburg, Aaron J; Callaghan, John J; Yehyawi, Tameem M; Pedersen, Douglas R; Liu, Steve S; Leinen, Jessica A; Dahl, Kevin A; Goetz, Devon D; Brown, Thomas D; Johnston, Richard C

    2009-07-01

    wire groups, respectively, at twenty years (p = 0.03). Because cable trochanteric attachment led to significantly greater polyethylene wear, osteolysis, acetabular loosening, and acetabular revision, presumably due to third-body metallic debris generation in this cemented total hip replacement construct, surgeons should be aware of the deleterious effects of third-body debris and avoid the use of potential debris generators in the total hip arthroplasty construct. If cable is used and fretting is recognized, especially with intra-articular migration of metallic material or nonunion of the greater trochanter, consideration should be given to cable removal.

  10. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  11. Changes in Energy Cost and Total External Work of Muscles in Elite Race Walkers Walking at Different Speeds

    Directory of Open Access Journals (Sweden)

    Chwała Wiesław

    2014-12-01

    Full Text Available The aim of the study was to assess energy cost and total external work (total energy depending on the speed of race walking. Another objective was to determine the contribution of external work to total energy cost of walking at technical, threshold and racing speed in elite competitive race walkers.

  12. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  13. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  14. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 2, Supporting information

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 collars) over the entire life of the system, or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  15. Cost Analysis of Total Joint Arthroplasty Readmissions in a Bundled Payment Care Improvement Initiative.

    Science.gov (United States)

    Clair, Andrew J; Evangelista, Perry J; Lajam, Claudette M; Slover, James D; Bosco, Joseph A; Iorio, Richard

    2016-09-01

    The Bundled Payment for Care Improvement (BPCI) Initiative is a Centers for Medicare and Medicaid Services program designed to promote coordinated and efficient care. This study seeks to report costs of readmissions within a 90-day episode of care for BPCI Initiative patients receiving total knee arthroplasty (TKA) or total hip arthroplasty (THA). From January 2013 through December 2013, 1 urban, tertiary, academic orthopedic hospital admitted 664 patients undergoing either primary TKA or THA through the BPCI Initiative. All patients readmitted to our hospital or an outside hospital within 90-days from the index episode were identified. The diagnosis and cost for each readmission were analyzed. Eighty readmissions in 69 of 664 patients (10%) were identified within 90-days. There were 53 readmissions (45 patients) after THA and 27 readmissions (24 patients) after TKA. Surgical complications accounted for 54% of THA readmissions and 44% of TKA readmissions. These complications had an average cost of $36,038 (range, $6375-$60,137) for THA and $38,953 (range, $4790-$104,794) for TKA. Eliminating the TKA outlier of greater than $100,000 yields an average cost of $27,979. Medical complications of THA and TKA had an average cost of $22,775 (range, $5678-$82,940) for THA and $24,183 (range, $3306-$186,069) for TKA. Eliminating the TKA outlier of greater than $100,000 yields an average cost of $11,682. Hospital readmissions after THA and TKA are common and costly. Identifying the causes for readmission and assessing the cost will guide quality improvement efforts. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. Linking the spare parts management with the total costs of ownership: An agenda for future research

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2016-12-01

    Full Text Available Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC. Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view. Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO. Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  17. Linking the spare parts management with the total costs of ownership: An agenda for future research

    International Nuclear Information System (INIS)

    Duran, O.; Roda, I.; Macchi, M.

    2016-01-01

    Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC). Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view). Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO). Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  18. Linking the spare parts management with the total costs of ownership: An agenda for future research

    Energy Technology Data Exchange (ETDEWEB)

    Duran, O.; Roda, I.; Macchi, M.

    2016-07-01

    Purpose: This manuscript explores the link between Spare Parts Management and Total Costs of Ownership or Life Cycle Costs (LCC). Design/methodology/approach: First, this work enumerates the different managerial decisions instances in spare parts management that are present during the life cycle of a physical asset. Second, we analyse how those decision instances could affect the TCO of a physical asset (from the economic point of view). Finally, we propose a conceptual framework for incorporating the spare parts management into a TCO model. Findings: The recent literature lacks discussions on the integration of spare parts management with the Total Costs of Ownership (TCO). Based in an extensive literature revision we can declare that the computation of costs related to spare parts management has been neglected by TCO models. Originality/value: The contribution of this paper is twofold. First, a literature review and identification of a series of spare parts management decision instances and its relationship with TCOs is presented in this paper. Second, a conceptual framework is suggested for linking those decisions instances to a total cost of ownership perspective. Some research questions and future research challenges are presented at the end of this work.

  19. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  20. Episode of Care Payments in Total Joint Arthroplasty and Cost Minimization Strategies.

    Science.gov (United States)

    Nwachukwu, Benedict U; O'Donnell, Evan; McLawhorn, Alexander S; Cross, Michael B

    2016-02-01

    Total joint arthroplasty (TJA) is receiving significant attention in the US health care system for cost containment strategies. Specifically, payer organizations have embraced and are implementing bundled payment schemes in TJA. Consequently, hospitals and providers involved in the TJA care cycle have sought to adapt to the new financial pressures imposed by episode of care payment models by analyzing what components of the total "event" of a TJA are most essential to achieve a good outcome after TJA. As part of this review, we analyze and discuss a health economic study by Snow et al. As part of their study, the authors aimed to understand the association between preoperative physical therapy (PT) and post-acute care resource utilization, and its effect on the total cost of care during total joint arthroplasty. The purpose of this current review therefore is to (1) describe and analyze the findings presented by Snow et al. and (2) provide a framework for analyzing and critiquing economic analyses in orthopedic surgery. The study under review, while having important strengths, has several notable limitations that are important to keep in mind when making policy and coverage decisions. We support cautious interpretation and application of study results, and we encourage maintained attention to economic analysis in orthopedics as well as continued care path redesign to maximize value for patients and health care providers.

  1. The influence of management and construction methods in the repair costs of Spain’s low-volume road network

    Directory of Open Access Journals (Sweden)

    Eutiquio Gallego

    2016-06-01

    Full Text Available This paper describes the entire process of the implementation of the Spanish low volume road network, including the design criteria, the construction techniques and the management policies during all the periods. The current situation of low volume roads in Spain was analyzed with respect to the legal framework and their actual condition. In addition, the budget required for the repair of 41 low volume roads throughout Spain was calculated in order to statistically analyze the influence of the pavement materials and the period of construction. The main conclusions were that low volume roads constructed during the 1970´s are currently those in the best state of repair and those requiring the lower repair costs, even lower than those constructed after 1980´s. In addition, low volume roads constructed with higher quality materials and using standardized techniques required five times lower repair costs than those made of lower quality materials.

  2. PERSONNEL COSTS IN THE CZECH CONSTRUCTION SECTOR: INVESTIGATING THE EFFECT OF COMPANY SIZE

    Directory of Open Access Journals (Sweden)

    Martina Paulišová

    2017-01-01

    Full Text Available : Managing personnel costs is important in all companies, especially in those whose production is labor intensive. The construction sector therefore qualifies as a suitable area for analyzing issues associated with these costs. The aim of this study is to find out whether company size affects personnel cost management under various circumstances. Four research hypotheses focus on the relationships among and the relative importance of personnel costs, use of standards, range of employee benefits offered, and economic actions taken when faced with an economic crisis. The evaluation of hypotheses is supported by using the chi-square test of independence with the aim of confirming or rejecting the statistical significance of relationships between the examined categorical variables. Results have confirmed a significant effect of company size. Several research implications and suggested future research directions are also presented in the conclusion of this paper.

  3. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  4. Clinical and cost effectiveness-related aspects of retransfusion in total hip and knee arthroplasty.

    Science.gov (United States)

    Dobosz, Bartłomiej; Dutka, Julian; Dutka, Lukasz; Maleta, Paweł

    2012-01-01

    An increasing demand for blood products forces the rationalisation of management and conservation of blood. The aim of the study is to evaluate the possibility of retransfusion of blood conservation and the cost-effectiveness of this procedure when employed in Total Hip Replacement and Total Knee Arthroplasty. This prospective cohort study involved two groups of patients. Group I comprised 50 patients who underwent blood retransfusion and in several cases had supplementary allogeneic transfusion. Group II, a control group, consisted of 50 patients who did not receive retransfusion. The retransfusion in Group I enabled the recovery of a mean amount of 364.5 ml (± 52.7) of blood in THR patients and 403.8 ml (± 110.7) in TKA patients. Demand for allogeneic blood transfusions in Group I versus Group II was 46% lower in THR patients and 42% lower in TKA patients. The blood recovered for retransfusion is biologically valuable with regard to cellular elements and plasma chemistries. In the costs evaluation, the total savings in Group I were 5,000 PLN. Retransfusion of recuperated blood from postoperative drainage tubing is a simple and safe method that provides clinical and cost-effectiveness advantages.

  5. Cost of and soil loss on "minimum-standard" forest truck roads constructed in the central Appalachians

    Science.gov (United States)

    J. N. Kochenderfer; G. W. Wendel; H. Clay Smith

    1984-01-01

    A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...

  6. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  7. A non-stationary cost-benefit analysis approach for extreme flood estimation to explore the nexus of 'Risk, Cost and Non-stationarity'

    Science.gov (United States)

    Qi, Wei

    2017-11-01

    Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.

  8. Reduction of construction periods of PWRs by optimization of detailed sequence planning

    International Nuclear Information System (INIS)

    Stocker, W.; Leverenz, R.

    1991-01-01

    The construction of PWR's is an enterprise with high investment costs, in total up to three billion US$ and with long construction periods of five years and more. Besides the results reached by the intensive standardization, a further reduction of the construction period is possible by optimization of detailed sequence planning and interfaces of work units. During the execution of the three German Convoy plants ISAR 2, EMSLAND and NECKARWESTHEIM 2, the contractual construction periods were shortened between 4 and 8 months. These reductions were reached after individual investigations by measures like advanced finishing work activities; erection of an increased amount of prefabricated pipings; rearrangement of erection sequences; overlapping of piping erection and electrical installation; reduction of plant commissioning period. All these measures support directly the reduction of the total investment cost of a plant, as already demonstrated by the Convoy plants. (author). 8 figs

  9. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  10. Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC

    International Nuclear Information System (INIS)

    Koontz, Roland F

    1999-01-01

    As design studies and various R and D efforts continue on Next Linear Collider (NLC) systems, much R and D work is being done on X-Band klystron development, and development of pulse modulators to drive these X-Band klystrons. A workshop on this subject was held at SLAC in June of 1998, and a follow-up workshop is scheduled at SLAC June 23-25, 1999. At the 1998 workshop, several avenues of R and D were proposed using solid state switching, induction LINAC principles, high voltage hard tubes, and a few more esoteric ideas. An optimized version of the conventional thyratron-PFN-pulse transformer modulator for which there is extensive operating experience is also a strong candidate for use in the NLC. Such a modulator is currently under construction for base line demonstration purposes. The performance of this ''Cost Model'' modulator will be compared to other developing technologies. Important parameters including initial capital cost, operating maintenance cost, reliability, maintainability, power efficiency, in addition to the usual operating parameters of pulse flatness, timing and pulse height jitter, etc. will be considered in the choice of a modulator design for the NLC. This paper updates the progress on this ''Cost Model'' modulator design and construction

  11. The economic and financing viability of the OPR-1000 construction at Muria Peninsula

    International Nuclear Information System (INIS)

    Moch Djoko Birmano; Mochamad Nasrullah

    2005-01-01

    The study of the economic and financing viability of the OPR-1000 construction at Muria Peninsula have been done. This study is carried out with steps as follows: updating of newest OPR-1000 technical and economic data; survey of financing sources; the calculation of electricity generation cost, electricity tariff, construction cost of OPR-1000; and calculation of OPR-1000 financing viability by using feasibility criteria such as Net Present Value (NPV), Internal Rate of Return (IRR) and capital payback period. The calculation of generation cost, electricity tariff, construction cost and financing viability criteria (IRR, NPV, Payback Period)by using KEPCO Spread Sheet. From the results of calculations how that the electricity generation cost is 4.0866 cent/kWh, while the electricity tariff is 6.6399 cent/kWh(after Value Added Tax). The total construction cost of OPR-1000 is US $4,092.09 million (included interest and financial fee, excluded initial nuclear fuel). The calculation of financing viability in base case obtained that value of IRR, NPV and Payback Period for total investment is 10.37%. US$90.52 million and 12.11 years respectively. From these results can be concluded that with the electricity tariff of 6.640 cent/kWh or 0.0664 US$/kWh, basically this project of OPR-1000 construction is very feasible and beneficial. From investment side, this project can attract investor because the rate of capital return is high enough, profit in the end of economic life is big enough and payback period is short. (author)

  12. Use of predefined biochemical admission profiles does not reduce the number of tests or total cost

    DEFF Research Database (Denmark)

    Pareek, Manan; Haidl, Felix; Folkestad, Lars

    2014-01-01

    The objective of this pilot study was to evaluate whether the use of predefined biochemical profiles as an alternative to individually ordered blood tests by the treating physicians resulted in fewer tests or a lower total cost.......The objective of this pilot study was to evaluate whether the use of predefined biochemical profiles as an alternative to individually ordered blood tests by the treating physicians resulted in fewer tests or a lower total cost....

  13. Modern methods of cost saving of the production activity in construction

    Science.gov (United States)

    Silka, Dmitriy

    2017-10-01

    Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.

  14. The Relationship between Cost Leadership Strategy, Total Quality Management Applications and Financial Performance

    OpenAIRE

    Ali KURT; Cemal ZEHİR

    2016-01-01

    Firms need to implement some competition strategies and total quality management applications to overcome the fierce competition among others. The purpose of this study is to show the relationship between cost leadership strategy, total quality management applications and firms’ financial performance with literature review and empirical analysis. 449 questionnaires were conducted to the managers of 142 big firms. The data gathered was assessed with AMOS. As a result, the relationship between ...

  15. Deep water tie-back economics capex vs opex and the total costs

    Energy Technology Data Exchange (ETDEWEB)

    Tarlton, Oran D. [Oil States Industries Inc., Arlington, TX (United States)

    2005-07-01

    This paper explores the real cost and time benefits associated with the current, past, and future contracting strategies associated with subsea developments. It looks at the real cost associated with out sourcing engineering development and the impact of engineering, procurement, installation, and construction (EPIC) contracts. Development costs are first and foremost in the minds of operators as a field is analyzed for development potential. The cycle starts with an analysis of the geological information to estimate the potential value in the field. It proceeds to conceptual design where the first development methodology and cost estimates are prepared. If the project is initially viable it will proceed from conceptual design to Front End Engineering and Design (FEED) where a complete development plan is prepared with possible options and recommendations. Engineering companies may as a part of the FEED prepare a Request for Quotation (RFQ) which is sent to potential suppliers. As part of a FEED contract, an engineering company may also review responses to the RFQ and provide recommendations for selected suppliers. Typically large subsea projects are divided into several major categories such as: topsides; subsea production systems; wells; subsea umbilical risers and glow lines (SURF), and commissioning in order to simplify management and procurement. Many times these contracts are awarded as EPIC contracts to further simplify management and internal procurement efforts. A case study is presented which challenges current contracting strategies and presents an option for a lower cost and a better way forward with respect to the short term and a focus on the long term. (author)

  16. Cost-effectiveness analysis of surface flow constructed wetlands (SFCW) for nutrient reduction in drainage discharge from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjærgaard, Charlotte

    2015-01-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies......, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients...... reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW...

  17. Construction of low-cost, Mod-OA wood composite wind turbine blades

    Science.gov (United States)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  18. Weight and cost analysis of large wind turbine rotors constructed from conventional materials and from advanced composite materials

    Energy Technology Data Exchange (ETDEWEB)

    van Holten, Th

    1982-07-01

    Cost calculations and cost analyses of the blades and the (teetering) hubs of large wind turbines. The blades are of different shapes, construction and materials (aluminium, steel and glass reinforced plastics). Teetering hubs are heavy and complicated steel constructions, necessary to minimize material fatigue. In large wind turbines with a diameter of 60 to 100 m or even more the rotor mass (hubs and blades together) may vary from 46,000 to 216,000 kg. Costs are estimated to be DFL. 16/kg, both for teetering hubs and/or blades made of glass reinforced plastics. Due to lack of experience and of exact knowledge of the loads appearing during operation under field conditions the uncertainty factor may be 10% to 15%.

  19. Evaluation of the Overall Costs for the Croatian Repository: Varying Site, Design and Financial Parameters

    International Nuclear Information System (INIS)

    Kucar-Dragicevic, S.; Subasic, D.; Lebegner, J.

    2000-01-01

    Preliminary preparations for the construction of a LILW repository in Croatia included a number of activities and projects related to the siting process, safety assessment, disposal technology and repository design, and public acceptance issues. Costs evaluations have always been a part of the developing project documentation. However, only the estimates of the facility construction and equipment acquisition costs had been included, while other costs associated with the project development and management have not been considered up to now. For the first time the infrastructure status at the potential sites has been evaluated, and the costs of the repository operations as well as the post-closure management has been estimated. Cost parameters have been considered from both technical and fiscal points of view, comparing their relative influence on the overall repository costs. Assessment of the total project costs in eight cases for the four preferential sites and two repository designs gave a clearer picture of the development and management costs differences for the considered options. Without considerations of the operational and post-operational repository management expenses, the total project costs appear to have been heavily underestimated. Also, while the construction costs for the tunnel and the surface type repositories are significantly different, this influence of the repository type on the total project costs becomes far less important when the later phases management expenses are added. Finally, the role of fiscal parameters may further diminish the site and technology impacts on the overall costs. (author)

  20. On information and communication technology and production cost in construction industry: evidence from the Netherlands

    NARCIS (Netherlands)

    van der Vlist, A.J; Vrolijk, M.H.; Dewulf, Geert P.M.R.

    2014-01-01

    The interplay between information and communication technology (ICT) and the competitiveness of construction firms is considered. More specifically, the question is whether firms that invest in information and communication technology have a production cost advantage. The economics literature

  1. Analysis on optimization of the critical path for civil construction period of Fangjiashan nuclear island constructed under EPC mode

    International Nuclear Information System (INIS)

    Liu Yongqing; Wu Youcong; Qiu Jinhong

    2011-01-01

    Based on the actual situation of nuclear island civil construction in Fangjiashan nuclear power plant and combined with the arrangement of the construction schedule, the analysis on optimization of the critical path for civil construction period is conducted. The result shows that on the premise of not increasing the contract price and the total engineering cost based on the original 57-month construction period, the construction period can be shorten to 21 month through strengthening the schedule control, keeping the critical work in a reasonable duration and rearranging the link between programmers. In addition, in view of the economic analysis, if we increase the mechanical engagement and adopt special method, the 2-month construction period can be even shortened to 20 months. (authors)

  2. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  3. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2017-09-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  4. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    OpenAIRE

    Mahmood Ali A.; Elektorowicz Maria

    2016-01-01

    As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices i...

  5. Time-driven Activity-based Cost of Fast-Track Total Hip and Knee Arthroplasty

    DEFF Research Database (Denmark)

    Andreasen, Signe E; Holm, Henriette B; Jørgensen, Mira

    2017-01-01

    this between 2 departments with different logistical set-ups. METHODS: Prospective data collection was analyzed using the time-driven activity-based costing method (TDABC) on time consumed by different staff members involved in patient treatment in the perioperative period of fast-track THA and TKA in 2 Danish...... orthopedic departments with standardized fast-track settings, but different logistical set-ups. RESULTS: Length of stay was median 2 days in both departments. TDABC revealed minor differences in the perioperative settings between departments, but the total cost excluding the prosthesis was similar at USD......-track methodology, the result could be a more cost-effective pathway altogether. As THA and TKA are potentially costly procedures and the numbers are increasing in an economical limited environment, the aim of this study is to present baseline detailed economical calculations of fast-track THA and TKA and compare...

  6. Construction and Characterization of a Compact, Portable, Low-Cost Colorimeter for the Chemistry Lab

    Science.gov (United States)

    Clippard, Carrie M.; Hughes, William; Chohan, Balwant S.; Sykes, Danny G.

    2016-01-01

    A low-cost and portable colorimeter was constructed featuring a low-voltage programmable color light sensor-to-frequency converter, a CMOS 8-bit microcontroller, and an LCD display. The instrument has successfully facilitated the introduction and application of spectroscopy to groups of middle school, high school, and undergraduate students. A…

  7. Effect of long construction times on utility financial requirements

    International Nuclear Information System (INIS)

    Francis, J.M.

    1981-01-01

    It is well-known that long construction times significantly increase the cost of an individual nuclear plant. Long construction times, however, are not confined to either a single plant or a single utility. Rather, they apparently occur in almost all nuclear plants currently under construction. The total financial requirement to complete the 82 nuclear plants currently under construction was assessed. The analysis was performed assuming a construction time of ten years in one case, and six years in another. It was found that decreasing the construction time from ten to six years will reduce the financial requirements of the utility industry by $89 billion

  8. Reduction of capital costs of nuclear power plants. NEA-report

    International Nuclear Information System (INIS)

    2000-01-01

    Since the the mid-1980s, the declining real prices of fossil fuels and the significant improvements in thermal efficiencies of combined cycle power plants have eroded the economic competitiveness of nuclear power plants in most OECD countries. In order for nuclear power to remain a viable option for the next millennium, the cost of electricity from nuclear power plant must be greatly reduced to be competitive with alternative sources. Of the three major components of nuclear generation cost - capital, O and M and fuel - the capital cost component makes up approximately 60 per cent of the total. Therefore, identification of the means to reduce the capital costs of nuclear power plants is a high priority activity toward keeping nuclear power competitive. Among a number of capital cost reduction measures, the principal ones were agreed by the expert group as follows: Increased plant size, improved construction methods, reduced construction schedule, design improvement, improved procurement, organisation and contractual aspects, standardisation and construction in series, multiple unit construction, regulatory and policy reform. (orig.)

  9. Proposal of Effective Quality Control and Insurance System of Construction Industry

    OpenAIRE

    Kawarasaki, Yuta; Nasu, Seigo

    2007-01-01

    In this research, the kinds and the number of defective qualities are examined, and the current state of the defective quality is understood. In addition, a social cost led by analyzing the quality control cost function and the quality insurance cost function in making optimal balance, and requesting a total cost are analyzed. The insurance system that adds the parameter of citizen’s senses of trust at the end leading to an ideal social cost in evaluating the optimal construction management l...

  10. Cost-Effectiveness Analysis of Surface Flow Constructed Wetlands (SFCW) for Nutrient Reduction in Drainage Discharge from Agricultural Fields in Denmark.

    Science.gov (United States)

    Gachango, F G; Pedersen, S M; Kjaergaard, C

    2015-12-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.

  11. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  12. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  13. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  14. Is total pancreatectomy as feasible, safe, efficacious, and cost-effective as pancreaticoduodenectomy? A single center, prospective, observational study.

    Science.gov (United States)

    Casadei, Riccardo; Ricci, Claudio; Taffurelli, Giovanni; Guariniello, Anna; Di Gioia, Anthony; Di Marco, Mariacristina; Pagano, Nico; Serra, Carla; Calculli, Lucia; Santini, Donatella; Minni, Francesco

    2016-09-01

    Total pancreatectomy is actually considered a viable option in selected patients even if large comparative studies between partial versus total pancreatectomy are not currently available. Our aim was to evaluate whether total pancreatectomy can be considered as feasible, safe, efficacious, and cost-effective as pancreaticoduodenectomy. A single center, prospective, observational trial, regarding postoperative outcomes, long-term results, and cost-effectiveness, in a tertiary referral center was conducted, comparing consecutive patients who underwent elective total pancreatectomy and/or pancreaticoduodenectomy. Seventy-three consecutive elective total pancreatectomies and 184 pancreaticoduodenectomies were compared. There were no significant differences regarding postoperative outcomes and overall survival. The quality of life, evaluated in 119 patients according to the EQ-5D-5L questionnaire, showed that there were no significant differences regarding the five items considered. The mean EQ-5D-5L score was similar in the two procedures (total pancreatectomy = 0.872, range 0.345-1.000; pancreaticoduodenectomy = 0.832, range 0.393-1.000; P = 0.320). The impact of diabetes according to the Problem Areas in Diabetes (PAID) questionnaire did not show any significant differences except for question 13 (total pancreatectomy = 0.60; pancreaticoduodenectomy = 0.19; P = 0.022). The cost-effectiveness analysis suggested that the quality-adjusted life year was not significantly different between the two procedures (total pancreatectomy = 0.910, range 0.345-1.000; pancreaticoduodenectomy = 0.910, range -0.393-1.000; P = 0.320). From this study, it seems reasonable to suggest that total pancreatectomy can be considered as safe, feasible, and efficacious as PD and acceptable in terms of cost-effectiveness.

  15. Cost-effectiveness of cervical total disc replacement vs fusion for the treatment of 2-level symptomatic degenerative disc disease.

    Science.gov (United States)

    Ament, Jared D; Yang, Zhuo; Nunley, Pierce; Stone, Marcus B; Kim, Kee D

    2014-12-01

    Cervical total disc replacement (CTDR) was developed to treat cervical spondylosis, while preserving motion. While anterior cervical discectomy and fusion (ACDF) has been the standard of care for 2-level disease, a randomized clinical trial (RCT) suggested similar outcomes. Cost-effectiveness of this intervention has never been elucidated. To determine the cost-effectiveness of CTDR compared with ACDF. Data were derived from an RCT that followed up 330 patients over 24 months. The original RCT consisted of multi-institutional data including private and academic institutions. Using linear regression for the current study, health states were constructed based on the stratification of the Neck Disability Index and a visual analog scale. Data from the 12-item Short-Form Health Survey questionnaires were transformed into utilities values using the SF-6D mapping algorithm. Costs were calculated by extracting Diagnosis-Related Group codes from institutional billing data and then applying 2012 Medicare reimbursement rates. The costs of complications and return-to-work data were also calculated. A Markov model was built to evaluate quality-adjusted life-years (QALYs) for both treatment groups. The model adopted a third-party payer perspective and applied a 3% annual discount rate. Patients included in the original RCT had to be diagnosed as having radiculopathy or myeloradiculopathy at 2 contiguous levels from C3-C7 that was unresponsive to conservative treatment for at least 6 weeks or demonstrated progressive symptoms. Incremental cost-effectiveness ratio of CTDR compared with ACDF. A strong correlation (R2 = 0.6864; P sensitivity analysis, the incremental cost-effectiveness ratio value stays below the threshold of $50,000 per QALY in most scenarios (range, -$58,194 to $147,862 per QALY). The incremental cost-effectiveness ratio of CTDR compared with traditional ACDF is lower than the commonly accepted threshold of $50,000 per QALY. This remains true with varying input

  16. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  17. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  18. Determining the Cost-Savings Threshold and Alignment Accuracy of Patient-Specific Instrumentation in Total Ankle Replacements.

    Science.gov (United States)

    Hamid, Kamran S; Matson, Andrew P; Nwachukwu, Benedict U; Scott, Daniel J; Mather, Richard C; DeOrio, James K

    2017-01-01

    Traditional intraoperative referencing for total ankle replacements (TARs) involves multiple steps and fluoroscopic guidance to determine mechanical alignment. Recent adoption of patient-specific instrumentation (PSI) allows for referencing to be determined preoperatively, resulting in less steps and potentially decreased operative time. We hypothesized that usage of PSI would result in decreased operating room time that would offset the additional cost of PSI compared with standard referencing (SR). In addition, we aimed to compare postoperative radiographic alignment between PSI and SR. Between August 2014 and September 2015, 87 patients undergoing TAR were enrolled in a prospectively collected TAR database. Patients were divided into cohorts based on PSI vs SR, and operative times were reviewed. Radiographic alignment parameters were retrospectively measured at 6 weeks postoperatively. Time-driven activity-based costing (TDABC) was used to derive direct costs. Cost vs operative time-savings were examined via 2-way sensitivity analysis to determine cost-saving thresholds for PSI applicable to a range of institution types. Cost-saving thresholds defined the price of PSI below which PSI would be cost-saving. A total of 35 PSI and 52 SR cases were evaluated with no significant differences identified in patient characteristics. Operative time from incision to completion of casting in cases without adjunct procedures was 127 minutes with PSI and 161 minutes with SR ( P cost-savings threshold range at our institution of $863 below which PSI pricing would provide net cost-savings. Two-way sensitivity analysis generated a globally applicable cost-savings threshold model based on institution-specific costs and surgeon-specific time-savings. This study demonstrated equivalent postoperative TAR alignment with PSI and SR referencing systems but with a significant decrease in operative time with PSI. Based on TDABC and associated sensitivity analysis, a cost-savings threshold

  19. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  20. Cost-Effective Mobile-Based Healthcare System for Managing Total Joint Arthroplasty Follow-Up.

    Science.gov (United States)

    Bitsaki, Marina; Koutras, George; Heep, Hansjoerg; Koutras, Christos

    2017-01-01

    Long-term follow-up care after total joint arthroplasty is essential to evaluate hip and knee arthroplasty outcomes, to provide information to physicians and improve arthroplasty performance, and to improve patients' health condition. In this paper, we aim to improve the communication between arthroplasty patients and physicians and to reduce the cost of follow-up controls based on mobile application technologies and cloud computing. We propose a mobile-based healthcare system that provides cost-effective follow-up controls for primary arthroplasty patients through questions about symptoms in the replaced joint, questionnaires (WOMAC and SF-36v2) and the radiological examination of knee or hip joint. We also perform a cost analysis for a set of 423 patients that were treated in the University Clinic for Orthopedics in Essen-Werden. The estimation of healthcare costs shows significant cost savings (a reduction of 63.67% for readmission rate 5%) in both the University Clinic for Orthopedics in Essen-Werden and the state of North Rhine-Westphalia when the mobile-based healthcare system is applied. We propose a mHealth system to reduce the cost of follow-up assessments of arthroplasty patients through evaluation of diagnosis, self-monitoring, and regular review of their health status.

  1. Energy potential of the wind and possibility for construction of big energy systems

    International Nuclear Information System (INIS)

    Gruevski, Trpe

    2004-01-01

    In this paper a brief theoretical survey is given on the wind as a clean and renewable energy source.The wind energy potential is analyzed as well as the power limits that could be obtained as a result of the wind kinetic energy.The total generating costs for wind turbine systems are determined by total investments costs, the life time, the operating and maintenance costs, the wind regime, the efficiency and availability of the wind turbine. The optimum size of a wind turbine depends on the wind speed, the wind turbine costs, the construction costs, the environmental impact and the social costs. The value of wind energy depends on the application that is made of the energy generated and on the costs of alternatives

  2. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  3. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program. Volume 1. The analysis and its results

    International Nuclear Information System (INIS)

    1986-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report provides cost estimates for the fourth evaluation of the adequacy of the fee. The total-system cost for the reference authorized-system program is estimated to be 24 to 32 billion (1985) dollars. The total-system cost for the reference improved-performance system is estimated to be 26 to 34 billion dollars. A number of sensitivity cases were analyzed. For the authorized system, the costs for the sensitivity cases studied range from 21 to 39 billion dollars. For the improved-performance system, which includes a facility for monitored retrievable storage, the total-system cost in the sensitivity cases is estimated to be as high as 41 billion dollars. The factors that affect costs more than any other single factor for both the authorized and the improved-performance systems are delays in repository startup. A preliminary analysis of the impact of extending the burnup of nuclear fuel in the reactor was also performed; its results indicate that the impact is insignificant: the total-system cost is essentially unchanged from the comparable constant-burnup cases. The current estimate of the the total-system cost for the reference authorized system is zero to 3 billion dollars (9%) higher than the estimate for the reference system in the January 1985 TSLCC analysis

  4. Total and methyl mercury concentrations in sediment and water of a constructed wetland in the Athabasca Oil Sands Region

    International Nuclear Information System (INIS)

    Oswald, Claire J.; Carey, Sean K.

    2016-01-01

    In the Athabasca Oil Sands Region in northeastern Alberta, Canada, oil sands operators are testing the feasibility of peatland construction on the post-mining landscape. In 2009, Syncrude Canada Ltd. began construction of the 52 ha Sandhill Fen pilot watershed, including a 15 ha, hydrologically managed fen peatland built on sand-capped soft oil sands tailings. An integral component of fen reclamation is post-construction monitoring of water quality, including salinity, fluvial carbon, and priority pollutant elements. In this study, the effects of fen reclamation and elevated sulfate levels on mercury (Hg) fate and transport in the constructed system were assessed. Total mercury (THg) and methylmercury (MeHg) concentrations in the fen sediment were lower than in two nearby natural fens, which may be due to the higher mineral content of the Sandhill Fen peat mix and/or a loss of Hg through evasion during the peat harvesting, stockpiling and placement processes. Porewater MeHg concentrations in the Sandhill Fen typically did not exceed 1.0 ng L −1 . The low MeHg concentrations may be a result of elevated porewater sulfate concentrations (mean 346 mg L −1 ) and an increase in sulphide concentrations with depth in the peat, which are known to suppress MeHg production. Total Hg and MeHg concentrations increased during a controlled mid-summer flooding event where the water table rose above the ground surface in most of the fen. The Hg dynamics during this event showed that hydrologic fluctuations in this system exacerbate the release of THg and MeHg downstream. In addition, the elevated SO 4 2− concentrations in the peat porewaters may become a problem with respect to downstream MeHg production once the fen is hydrologically connected to a larger wetland network that is currently being constructed. - Highlights: • A constructed fen peatland in the Athabasca Oil Sands Region was studied. • Total and methyl mercury concentrations in fen sediment and waters

  5. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  6. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  7. Los Alamos Scientific Laboratory building cost index

    International Nuclear Information System (INIS)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL

  8. Los Alamos Scientific Laboratory building cost index

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL.

  9. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  10. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    Directory of Open Access Journals (Sweden)

    Mahmood Ali A.

    2016-01-01

    Full Text Available As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices in terms of environmental sustainability are much higher when compared to normal sand matrices.

  11. Effect of Body Mass Index and Psychosocial Traits on Total Knee Replacement Costs in Patients with Osteoarthritis.

    Science.gov (United States)

    Waimann, Christian A; Fernandez-Mazarambroz, Rodrigo J; Cantor, Scott B; Lopez-Olivo, Maria A; Barbo, Andrea G; Landon, Glenn C; Siff, Sherwin J; Lin, Heather; Suarez-Almazor, Maria E

    2016-08-01

    Clinical and psychosocial attributes are associated with clinical outcomes after total knee replacement (TKR) surgery in patients with osteoarthritis (OA), but their relationship with TKR-related costs is less clear. Our objective was to evaluate the effect of clinical and psychosocial attributes on TKR costs. We conducted a 6-month prospective cohort study of patients with knee OA who underwent TKR. We examined baseline demographic, clinical [body mass index (BMI) and comorbidities], and psychosocial attributes (social support, locus of control, coping, depression, anxiety, stress, and self-efficacy); baseline and 6-month OA clinical outcomes [Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC) pain and function]; and 6-month direct and indirect TKR-related costs. Multiple regression was performed to identify determinants of TKR-related costs. We included 212 patients; 66% were women, 71% were white, and the mean age was 65.2 years. The mean baseline WOMAC pain score was 55 (SD 19) and WOMAC function score was 54 (SD 20). Mean total TKR-related costs were US$30,831 (SD $9893). Multivariate regression analyses showed that increasing BMI and anxiety levels and decreasing levels of positive social interactions were associated with increased costs. A lower cost scenario with a lower range of normal BMI (19.5), highest positive social interaction, and no anxiety predicted TKR costs to be $22,247. Predicted costs in obese patients (BMI 36) with lowest positive social interaction and highest anxiety were $58,447. Increased baseline BMI, anxiety, and poor social support lead to higher TKR-related costs in patients with knee OA. Preoperative interventions targeting these factors may reduce TKR-related costs, and therefore be cost-effective.

  12. Modified design in new construction prevents infiltration of soil gas that carries radon

    International Nuclear Information System (INIS)

    Ericson, S.O.; Schmied, H.

    1987-01-01

    Dwellings located on permeable soil with strong exhalation of radon often get a contribution to indoor radon from infiltrating soil gas carrying radon from the ground into the building. 100 dwellings have been built on radon dangerous land with different modifications in design and construction in order to prevent infiltration of radon. Tight construction, ventilated crawl space, ventilation/depressurization of the capillary breaking layer (crushed stone), and mechanical ventilation with heat recovery by air to air heat exchangers or heat pumps have been tested. Added building costs and measured concentration of radon after construction and 3-5 years later are reported. It is concluded that it is possible to build radon protective and radon safe dwellings on any land. The added costs have ranged from zero to 4% of total building costs

  13. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 1, The analysis and its results

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 dollars) over the entire life of the system...or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  14. Cost-analysis of robotic-assisted laparoscopic hysterectomy versus total abdominal hysterectomy for women with endometrial cancer and atypical complex hyperplasia

    DEFF Research Database (Denmark)

    Herling, Suzanne Forsyth; Palle, Connie; Møller, Ann M.

    2016-01-01

    INTRODUCTION: The aim of this study was to analyse the hospital cost of treatment with robotic-assisted laparoscopic hysterectomy and total abdominal hysterectomy for women with endometrial cancer or atypical complex hyperplasia and to identify differences in resource use and cost. MATERIAL...... AND METHODS: This cost analysis was based on two cohorts: women treated with robotic-assisted laparoscopic hysterectomy (n = 202) or with total abdominal hysterectomy (n = 158) at Copenhagen University Hospital, Herlev, Denmark. We conducted an activity-based cost analysis including consumables and healthcare...... professionals' salaries. As cost-drivers we included severe complications, duration of surgery, anesthesia and stay at the post-anesthetic care unit, as well as number of hospital bed-days. Ordinary least-squares regression was used to explore the cost variation. The primary outcome was cost difference...

  15. COUNTERBALANCING BENEFITS AND DRAWBACKS OF CONTEMPORARY STABLISED EARTH CONSTRUCTION BY CONSTRUCTION PROFESSIONALS

    Directory of Open Access Journals (Sweden)

    Mohammad Sharif Zami

    2011-07-01

    Full Text Available It is debatable among the construction professionals whether contemporary stabilised earth construction is beneficial in urban low cost housing. Existing literature recorded a lot of benefits and drawbacks from construction professionals, which is empirically substantiated. But there are drawbacks found in the literature that seemingly are conflicting, and construction professionals are divided in their opinion. This paper seeks to address these conflicts and division by validating the controversial drawbacks of contemporary stabilised earth construction in urban low cost housing.

  16. Cost of post-operative intravenous iron therapy in total lower limb arthroplasty: a retrospective, matched cohort study

    Science.gov (United States)

    Muñoz, Manuel; Gómez-Ramírez, Susana; Martín-Montañez, Elisa; Naveira, Enrique; Seara, Javier; Pavía, José

    2014-01-01

    Background Requirements for allogeneic red cell transfusion after total lower limb arthroplasty are still high (20–50%), and post-operative intravenous iron has been shown to reduce transfusion requirements for this surgery. We performed a cost analysis to ascertain whether this alternative is also likely to be cost-effective. Materials and methods Data from 182 matched-pairs of total lower limb arthroplasty patients, managed with a restrictive transfusion protocol and without (control group) or with post-operative intravenous iron (iron group), were retrospectively reviewed. Acquisition and administration costs of iron (iron sucrose or ferric carboxymaltose) and allogeneic red cell concentrates, haemoglobin measurements, and prolonged stay in hospital were used for blood management cost analysis. Results Patients in the iron group received 600 mg intravenous iron, without clinically relevant incidents, and had a lower allogeneic transfusion rate (11.5% vs 26.4% for the iron and control groups, respectively; p=0.001). The reduction in transfusion rate was more pronounced in anaemic patients (17% vs 40%; p=0.015) than in non-anaemic ones (9.6% vs 21.2%; p=0.011). There were no differences with respect to post-operative infection rate. Patients receiving allogeneic transfusion stayed in hospital longer (+1.9 days [95% CI: 1.2–2.6]). As intravenous iron reduces the allogeneic transfusion rate, both iron formulations were cost-neutral in the different cost scenarios (−25.5 to 62.1 €/patient for iron sucrose, and −51.1 to 64.4 €/patient for ferric carboxymaltose). Discussion In patients presenting with or without pre-operative anaemia, post-operative intravenous iron after total lower limb arthroplasty seems to be safe and is associated with reduced transfusion rates, without incremental costs. For anaemic patients, its efficacy could be increased by associating some other blood-saving method. PMID:24120595

  17. Assessing the Total cost of ownership of ERP systems : Case study analysis on the factors behind customer costs in recent minor implementations

    OpenAIRE

    Rydgård, Göran; Palmberg, Nils

    2010-01-01

    This master’s thesis presents a model for calculating the total cost of ownership (TCO) of relatively small ERP implementations, including two years of running the system. The main factors affecting the cost items in the model are also analyzed, based in part on four case projects that the consultancy company Acando has carried out recently and in part on literature. The case projects were investigated through interviews with key actors in the projects from Acando and the customer, and throug...

  18. Quantifying the total cost of infrastructure to enable environmentally preferable decisions: the case of urban roadway design

    Science.gov (United States)

    Gosse, Conrad A.; Clarens, Andres F.

    2013-03-01

    Efforts to reduce the environmental impacts of transportation infrastructure have generally overlooked many of the efficiencies that can be obtained by considering the relevant engineering and economic aspects as a system. Here, we present a framework for quantifying the burdens of ground transportation in urban settings that incorporates travel time, vehicle fuel and pavement maintenance costs. A Pareto set of bi-directional lane configurations for two-lane roadways yields non-dominated combinations of lane width, bicycle lanes and curb parking. Probabilistic analysis and microsimulation both show dramatic mobility reductions on road segments of insufficient width for heavy vehicles to pass bicycles without encroaching on oncoming traffic. This delay is positively correlated with uphill grades and increasing traffic volumes and inversely proportional to total pavement width. The response is nonlinear with grade and yields mixed uphill/downhill optimal lane configurations. Increasing bicycle mode share is negatively correlated with total costs and emissions for lane configurations allowing motor vehicles to safely pass bicycles, while the opposite is true for configurations that fail to facilitate passing. Spatial impacts on mobility also dictate that curb parking exhibits significant spatial opportunity costs related to the total cost Pareto curve. The proposed framework provides a means to evaluate relatively inexpensive lane reconfiguration options in response to changing modal share and priorities. These results provide quantitative evidence that efforts to reallocate limited pavement space to bicycles, like those being adopted in several US cities, could appreciably reduce costs for all users.

  19. Quantifying the total cost of infrastructure to enable environmentally preferable decisions: the case of urban roadway design

    International Nuclear Information System (INIS)

    Gosse, Conrad A; Clarens, Andres F

    2013-01-01

    Efforts to reduce the environmental impacts of transportation infrastructure have generally overlooked many of the efficiencies that can be obtained by considering the relevant engineering and economic aspects as a system. Here, we present a framework for quantifying the burdens of ground transportation in urban settings that incorporates travel time, vehicle fuel and pavement maintenance costs. A Pareto set of bi-directional lane configurations for two-lane roadways yields non-dominated combinations of lane width, bicycle lanes and curb parking. Probabilistic analysis and microsimulation both show dramatic mobility reductions on road segments of insufficient width for heavy vehicles to pass bicycles without encroaching on oncoming traffic. This delay is positively correlated with uphill grades and increasing traffic volumes and inversely proportional to total pavement width. The response is nonlinear with grade and yields mixed uphill/downhill optimal lane configurations. Increasing bicycle mode share is negatively correlated with total costs and emissions for lane configurations allowing motor vehicles to safely pass bicycles, while the opposite is true for configurations that fail to facilitate passing. Spatial impacts on mobility also dictate that curb parking exhibits significant spatial opportunity costs related to the total cost Pareto curve. The proposed framework provides a means to evaluate relatively inexpensive lane reconfiguration options in response to changing modal share and priorities. These results provide quantitative evidence that efforts to reallocate limited pavement space to bicycles, like those being adopted in several US cities, could appreciably reduce costs for all users. (letter)

  20. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  1. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control. 

  2. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control.

  3. Design of cost-effective M 25 grade of self compacting concrete

    International Nuclear Information System (INIS)

    Guru Jawahar, J.; Sashidhar, C.; Ramana Reddy, I.V.; Annie Peter, J.

    2013-01-01

    Highlights: ► Design of cost-effective M 25 grade of self compacting concrete is done. ► Mechanical properties of SCC compared with M 25 grade of conventional concrete. ► Effect of class F fly ash is studied on the SCC mechanical properties. ► Cost analysis is done between M 25 grade of CC and SCC. ► Recommendation of M 25 grade of SCC for normal building constructions. - Abstract: This investigation is mainly focused on the development of cost-effective normal strength M 25 grade of self compacting concrete (SCC) for the use of normal building constructions. Keeping in view of the normal strength, cost, quality and durability of SCC and greenhouse gas emissions, a combination type of SCC was developed with 35% replacement of cement with class F fly ash. This study recommended a SCC mix with moderate fines to obtain a cost-effective normal strength SCC for the normal building constructions. Studies also revealed that further reduction in fines content in SCC with the same replacement level of fly ash decreased the SCC strength and its performance. Cost analysis has been done between M 25 grade of SCC and conventional concrete (CC). Results shown that the SCC material cost is slightly higher than that of CC of the same strength class, but the savings in labour cost and construction time and quality of SCC would offset the SCC material cost and reduce the total life cycle cost of SCC

  4. NSS design and plant construction interfaces

    International Nuclear Information System (INIS)

    Stewart, J.J.; Cobb, W.A.

    1976-01-01

    Interface management between NSS design, balance-of-plant design, and plant construction may have a significant effect on schedule stretchout and total plant costs. The paper discusses the importance of the NSS supplier's interface management role, the favorable and unfavorable influencing factors, and examples of interface areas in which experience has demonstrated that problems may arise. Where appropriate, actions are defined to avoid the problems or mitigate the consequences

  5. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  6. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

    Directory of Open Access Journals (Sweden)

    Igor Peško

    2017-01-01

    Full Text Available Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs and support vector machines (SVM are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

  7. Iliac crest autograft versus alternative constructs for anterior cervical spine surgery: Pros, cons, and costs

    Science.gov (United States)

    Epstein, Nancy E.

    2012-01-01

    Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321

  8. Review of Constructed Subsurface Flow vs. Surface Flow Wetlands

    International Nuclear Information System (INIS)

    HALVERSON, NANCY

    2004-01-01

    The purpose of this document is to use existing documentation to review the effectiveness of subsurface flow and surface flow constructed wetlands in treating wastewater and to demonstrate the viability of treating effluent from Savannah River Site outfalls H-02 and H-04 with a subsurface flow constructed wetland to lower copper, lead and zinc concentrations to within National Pollutant Discharge Elimination System (NPDES) Permit limits. Constructed treatment wetlands are engineered systems that have been designed and constructed to use the natural functions of wetlands for wastewater treatment. Constructed wetlands have significantly lower total lifetime costs and often lower capital costs than conventional treatment systems. The two main types of constructed wetlands are surface flow and subsurface flow. In surface flow constructed wetlands, water flows above ground. Subsurface flow constructed wetlands are designed to keep the water level below the top of the rock or gravel media, thus minimizing human and ecological exposure. Subsurface flow wetlands demonstrate higher rates of contaminant removal per unit of land than surface flow (free water surface) wetlands, therefore subsurface flow wetlands can be smaller while achieving the same level of contaminant removal. Wetlands remove metals using a variety of processes including filtration of solids, sorption onto organic matter, oxidation and hydrolysis, formation of carbonates, formation of insoluble sulfides, binding to iron and manganese oxides, reduction to immobile forms by bacterial activity, and uptake by plants and bacteria. Metal removal rates in both subsurface flow and surface flow wetlands can be high, but can vary greatly depending upon the influent concentrations and the mass loading rate. Removal rates of greater than 90 per cent for copper, lead and zinc have been demonstrated in operating surface flow and subsurface flow wetlands. The constituents that exceed NPDES limits at outfalls H-02 a nd H

  9. Cost and schedule reduction for next-generation Candu

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M.

    2002-01-01

    construction costs through more efficient work planning and use of materials, through reduced re-work and through more precise configuration management. Full-scale exploitation of AECL's electronic engineering and project management tools enables further reductions in cost. The Candu fuel-channel reactor type offers inherent manufacturing and construction advantages through the application of a simple, low-pressure low-temperature reactor vessel along with modular fuel channel technology. This leads to cost benefits and total project schedule benefits. As a result, the targets which AECL has set for replication units - overnight capital cost of $1000 US/kW and total project schedule (engineering/manufacturing/construction/commissioning) of 48 months, have been shown to be achievable for the reference NG Candu design. (authors)

  10. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  11. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  12. Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Bruno L. Tanko

    2017-01-01

    Full Text Available The central goal of construction stakeholders is to successfully deliver projects to stated objective (s. However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50 construction constraints, which were further classified into eight (8 major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost, Stakeholders interactive-related factors (inability to establish client value system, Client-related factors (Delay in interim payment and finance problem, and Labor/material-related factors (escalation of material prices and materials quality variability are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

  13. Fusion reactor cost reductions by employing non-nuclear grade components

    International Nuclear Information System (INIS)

    Bourque, R.F.; Maya, I.; Schultz, K.R.; Sonn, D.L.; Wise, R.K.

    1987-09-01

    The Cascade inertial confinement fusion reactor fits the requirements of low radioactive inventories and inherent safety and is therefore a candidate for non-nuclear construction throughout. This reactor consists of a rotating blanket of ceramic granules that absorb the energy from D-T target explosions occurring along the rotational axis. Laser energy is beamed in axially from both ends. Two cost estimates were made for an 815 MWe Cascade power plant. One was based on an ''all conventional'' plant, which is constructed and costed using well-established, conventional fossil power plant methods. The second was a ''nuclear plus conventional'' design, constructed and costed using a combination of fossil and fission reactor plant methods and standards that would be typical of advanced fission reactors. The total capital requirements for the ''all conventional'' construction plant were estimated in 1985 dollars at $1490 M, including indirect costs. Similarly, the ''nuclear plus conventional'' construction plant was estimated at $1940 M. The savings of $450 M (23%) represents strictly the difference between Cascade ICF power plants designed and constructed to nuclear safety-related requirements versus all non-nuclear. This example clearly shows that, if fusion plants can take advantage of low activation materials and inherent safety features to eliminate the need for nuclear-related expenses, then such plants may have economic advantages over nuclear-grade systems. 13 refs., 1 fig., 5 tabs

  14. Total direct cost, length of hospital stay, institutional discharges and their determinants from rehabilitation settings in stroke patients.

    Science.gov (United States)

    Saxena, S K; Ng, T P; Yong, D; Fong, N P; Gerald, K

    2006-11-01

    Length of hospital stay (LOHS) is the largest determinant of direct cost for stroke care. Institutional discharges (acute care and nursing homes) from rehabilitation settings add to the direct cost. It is important to identify potentially preventable medical and non-medical reasons determining LOHS and institutional discharges to reduce the direct cost of stroke care. The aim of the study was to ascertain the total direct cost, LOHS, frequency of institutional discharges and their determinants from rehabilitation settings. Observational study was conducted on 200 stroke patients in two rehabilitation settings. The patients were examined for various socio-demographic, neurological and clinical variables upon admission to the rehabilitation hospitals. Information on total direct cost and medical complications during hospitalization were also recorded. The outcome variables measured were total direct cost, LOHS and discharges to institutions (acute care and nursing home facility) and their determinants. The mean and median LOHS in our study were 34 days (SD = 18) and 32 days respectively. LOHS and the cost of hospital stay were significantly correlated. The significant variables associated with LOHS on multiple linear regression analysis were: (i) severe functional impairment/functional dependence Barthel Index institutional discharges (22 to acute care and 17 to nursing homes). On multivariate analysis the significant predictors of discharges to institutions from rehabilitation hospitals were medical complications (OR = 4.37; 95% CI 1.01-12.53) and severe functional impairment/functional dependence. (OR = 5.90, 95% CI 2.32-14.98). Length of hospital stay and discharges to institutions from rehabilitation settings are significantly determined by medical complications. Importance of adhering to clinical pathway/protocol for stroke care is further discussed.

  15. Analysing uncertainty around costs of innovative medical technologies: the case of fibrin sealant (QUIXIL) for total knee replacement.

    NARCIS (Netherlands)

    Steuten, Lotte Maria Gertruda; Vallejo-Torres, Laura; Bastide, Philippe; Buxton, Martin J.

    2009-01-01

    This paper presents a relatively simple cost model comparing the costs of using a commercial fibrin sealant (QUIXIL®) in addition to conventional haemostatic treatment vs. conventional treatment alone in total knee replacement (TKR) surgery, and demonstrates and discusses how one- and two-way

  16. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  17. Multi-Product Total Cost of Function for Higher Education: A Case of Bible Colleges.

    Science.gov (United States)

    Koshal, Rajindar K.; Koshal, Manjulika; Gupta, Ashok

    2001-01-01

    This study empirically estimates a multiproduct total cost function and output relationship for comprehensive U.S. universities. Statistical results for 184 Bible colleges suggest that there are both economies of scale and of scope in higher education. Additionally, product-specific economies of scope exist for all output levels and activities.…

  18. Minimization of Construction Costs for an All Battery-Swapping Electric-Bus Transportation System: Comparison with an All Plug-In System

    Directory of Open Access Journals (Sweden)

    Shyang-Chyuan Fang

    2017-06-01

    Full Text Available The greenhouse gases and air pollution generated by extensive energy use have exacerbated climate change. Electric-bus (e-bus transportation systems help reduce pollution and carbon emissions. This study analyzed the minimization of construction costs for an all battery-swapping public e-bus transportation system. A simulation was conducted according to existing timetables and routes. Daytime charging was incorporated during the hours of operation; the two parameters of the daytime charging scheme were the residual battery capacity and battery-charging energy during various intervals of daytime peak electricity hours. The parameters were optimized using three algorithms: particle swarm optimization (PSO, a genetic algorithm (GA, and a PSO–GA. This study observed the effects of optimization on cost changes (e.g., number of e-buses, on-board battery capacity, number of extra batteries, charging facilities, and energy consumption and compared the plug-in and battery-swapping e-bus systems. The results revealed that daytime charging can reduce the construction costs of both systems. In contrast to the other two algorithms, the PSO–GA yielded the most favorable optimization results for the charging scheme. Finally, according to the cases investigated and the parameters of this study, the construction cost of the plug-in e-bus system was shown to be lower than that of the battery-swapping e-bus system.

  19. An Overview of Total Quality Management (TQM) practice in Construction Sector

    Science.gov (United States)

    Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed

    2018-04-01

    In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.

  20. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  1. Design to Cost and Life Cycle Cost.

    Science.gov (United States)

    1980-07-01

    MANAGEMENT TASK ORIENTATED COST STRUCTURE 5. COSTS OF CONSTRUCTION INIFRA 2. COSTS DURING DEVELOPMENT -6. COSTS OF TRAINING 3. COSTS DURING TESi ...de r~duction des coats, ii faut disponer de ?!vyenr. performants d’eetimation des coats en main-d’oeuvre et en applrvininrinesent. Cam moyenm doivent

  2. Leveraging Real-World Evidence in Disease-Management Decision-Making with a Total Cost of Care Estimator.

    Science.gov (United States)

    Nguyen, Thanh-Nghia; Trocio, Jeffrey; Kowal, Stacey; Ferrufino, Cheryl P; Munakata, Julie; South, Dell

    2016-12-01

    Health management is becoming increasingly complex, given a range of care options and the need to balance costs and quality. The ability to measure and understand drivers of costs is critical for healthcare organizations to effectively manage their patient populations. Healthcare decision makers can leverage real-world evidence to explore the value of disease-management interventions in shifting total cost trends. To develop a real-world, evidence-based estimator that examines the impact of disease-management interventions on the total cost of care (TCoC) for a patient population with nonvalvular atrial fibrillation (NVAF). Data were collected from a patient-level real-world evidence data set that uses the IMS PharMetrics Health Plan Claims Database. Pharmacy and medical claims for patients meeting the inclusion or exclusion criteria were combined in longitudinal cohorts with a 180-day preindex and 360-day follow-up period. Descriptive statistics, such as mean and median patient costs and event rates, were derived from a real-world evidence analysis and were used to populate the base-case estimates within the TCoC estimator, an exploratory economic model that was designed to estimate the potential impact of several disease-management activities on the TCoC for a patient population with NVAF. Using Microsoft Excel, the estimator is designed to compare current direct costs of medical care to projected costs by varying assumptions on the impact of disease-management activities and applying the associated changes in cost trends to the affected populations. Disease-management levers are derived from literature-based concepts affecting costs along the NVAF disease continuum. The use of the estimator supports analyses across 4 US geographic regions, age, cost types, and care settings during 1 year. All patients included in the study were continuously enrolled in their health plan (within the IMS PharMetrics Health Plan Claims Database) between July 1, 2010, and June 30

  3. Construção de um calorímetro isotérmico diferencial de alta sensibilidade e baixo custo Construction of a differential isothermal calorimeter of high sensitivity and low cost

    Directory of Open Access Journals (Sweden)

    Rafael Bergamo Trinca

    2009-01-01

    Full Text Available The high cost of sensitivity commercial calorimeters may represent an obstacle for many calorimetric research groups. This work describes the construction and calibration of a batch differential heat conduction calorimeter with sample cells volumes of about 400 μL. The calorimeter was built using two small high sensibility square Peltier thermoelectric sensors and the total cost was estimated to be about US$ 500. The calorimeter was used to study the excess enthalpy of solution of binary mixtures of liquids, as a function of composition, for the following binary systems of solvents: water + 1,4-dioxane or + dimethylsulfoxide at 298,2 ± 0,5 K.

  4. Optimization of shell-and-tube heat exchangers conforming to TEMA standards with designs motivated by constructal theory

    International Nuclear Information System (INIS)

    Yang, Jie; Fan, Aiwu; Liu, Wei; Jacobi, Anthony M.

    2014-01-01

    Highlights: • A design method of heat exchangers motivated by constructal theory is proposed. • A genetic algorithm is applied and the TEMA standards are rigorously followed. • Three cases are studied to illustrate the advantage of the proposed design method. • The design method will reduce the total cost compared to two other methods. - Abstract: A modified optimization design approach motivated by constructal theory is proposed for shell-and-tube heat exchangers in the present paper. In this method, a shell-and-tube heat exchanger is divided into several in-series heat exchangers. The Tubular Exchanger Manufacturers Association (TEMA) standards are rigorously followed for all design parameters. The total cost of the whole shell-and-tube heat exchanger is set as the objective function, including the investment cost for initial manufacture and the operational cost involving the power consumption to overcome the frictional pressure loss. A genetic algorithm is applied to minimize the cost function by adjusting parameters such as the tube and shell diameters, tube length and tube arrangement. Three cases are studied which indicate that the modified design approach can significantly reduce the total cost compared to the original design method and traditional genetic algorithm design method

  5. Cost Savings of Nuclear Power with Total Fuel Reprocessing

    International Nuclear Information System (INIS)

    Solbrig, Charles W.; Benedict, Robert W.

    2006-01-01

    The cost of fast reactor (FR) generated electricity with pyro-processing is estimated in this article. It compares favorably with other forms of energy and is shown to be less than that produced by light water reactors (LWR's). FR's use all the energy in natural uranium whereas LWR's utilize only 0.7% of it. Because of high radioactivity, pyro-processing is not open to weapon material diversion. This technology is ready now. Nuclear power has the same advantage as coal power in that it is not dependent upon a scarce foreign fuel and has the significant additional advantage of not contributing to global warming or air pollution. A jump start on new nuclear plants could rapidly allow electric furnaces to replace home heating oil furnaces and utilize high capacity batteries for hybrid automobiles: both would reduce US reliance on oil. If these were fast reactors fueled by reprocessed fuel, the spent fuel storage problem could also be solved. Costs are derived from assumptions on the LWR's and FR's five cost components: 1) Capital costs: LWR plants cost $106/MWe. FR's cost 25% more. Forty year amortization is used. 2) The annual O and M costs for both plants are 9% of the Capital Costs. 3) LWR fuel costs about 0.0035 $/kWh. Producing FR fuel from spent fuel by pyro-processing must be done in highly shielded hot cells which is costly. However, the five foot thick concrete walls have the advantage of prohibiting diversion. LWR spent fuel must be used as feedstock for the FR initial core load and first two reloads so this FR fuel costs more than LWR fuel. FR fuel costs much less for subsequent core reloads ( 6 /MWe. The annual cost for a 40 year licensed plant would be 2.5 % of this or less if interest is taken into account. All plants will eventually have to replace those components which become radiation damaged. FR's should be designed to replace parts rather than decommission. The LWR costs are estimated to be 2.65 cents/kWh. FR costs are 2.99 cents/kWh for the first

  6. Cost evaluation of radiation vulcanization of natural rubber latex

    International Nuclear Information System (INIS)

    Makuuchi, K.

    2003-01-01

    Cost of radiation vulcanized NR latex was evaluated. The plant would be built in an existing dipping factory in an industrial area in a Southeast Asian country. One thousands dry tons of NR latex are vulcanized with a low energy electron accelerator. The electron accelerator is a self-shielding low energy type. The maximum accelerating voltage is 300 kV and the output power is 10 kW. The total construction cost of the plant is $400,000 including electron accelerator and other equipments. Costs of raw materials and utilities are $1.165 and $0.023 per one kg of product, respectively. The fixed costs of the plant consist of labor costs, labor overhead, maintenance, plant overhead, depreciation, and bank interest. It is $0.190/kg of product. The company overhead for operation including company management, R and D and insurance is $0.044/kg of product. Thus, the total production cost is estimated to be $1.422/kg of product. (author)

  7. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  8. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  9. Calculating utility prudency issue costs

    International Nuclear Information System (INIS)

    Nielsen, K.R.

    1985-01-01

    The nuclear industry, particularly utilities and their construction, engineering and vendor agents, is faced with a surging increase in prudency management audits. What started as primarily a nuclear project-oriented requirement has spread to encompass most significant utility capital construction projects. Such audits are often a precedent condition to commencement of rate hearings. The cost engineer, a primary major capital construction project participant, is required to develop or critique ''prudency issue'' costs as part of such audits. Although utility costs in the broadest sense are potentially at issue, this paper concentrates on the typical project/construction management costs. The costs of design, procurement and construction are all subject to the calculation process

  10. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  11. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  12. Direct hospital costs of total laparoscopic hysterectomy compared with fast-track open hysterectomy at a tertiary hospital: a retrospective case-controlled study.

    Science.gov (United States)

    Rhou, Yoon J J; Pather, Selvan; Loadsman, John A; Campbell, Neil; Philp, Shannon; Carter, Jonathan

    2015-12-01

    To assess the direct intraoperative and postoperative costs in women undergoing total laparoscopic hysterectomy and fast-track open hysterectomy. A retrospective review of the direct hospital-related costs in a matched cohort of women undergoing total laparoscopic hysterectomy (TLH) and fast-track open hysterectomy (FTOH) at a tertiary hospital. All costs were calculated, including the cost of advanced high-energy laparoscopic devices. The effect of the learning curve on cost in laparoscopic hysterectomy was also assessed, as was the hospital case-weighted cost, which was compared with the actual cost. Fifty women were included in each arm of the study. TLH had a higher intraoperative cost, but a lower postoperative cost than FTOH (AUD$3877 vs AUD$2776 P funding model in our hospital is inaccurate when compared to directly calculated hospital costs. © 2013 The Authors ANZJOG © 2013 The Royal Australian and New Zealand College of Obstetricians and Gynaecologists.

  13. Do illness rating systems predict discharge location, length of stay, and cost after total hip arthroplasty?

    Directory of Open Access Journals (Sweden)

    Sarah E. Rudasill, BA

    2018-06-01

    Conclusions: These findings suggest that although ASA classifications predict discharge location and SOI scores predict length of stay and total costs, other factors beyond illness rating systems remain stronger predictors of discharge for THA patients.

  14. TECHNICAL AND ECONOMIC SUBSTANTIATION OF PROJECTS OF THE AFFORDABLE HOUSING CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    KRAVCHUNOVSKA T. S.

    2015-12-01

    Full Text Available Summary. Problem statement. The development of inhabitant locality of Ukraine is characterized by significant differences in levels of socio and economic development. An excessive concentration of population and industry in large cities, inefficient, slow development of most medium and small cities, towns and villages, considerable territorial disproportions of economic development of the country, considerable shortcomings in the territorial organization of society are observed. At the same time the tendency of the total area of increasing of inhabitant locality. The lands are used inefficiently. Among the most common problems of inhabitant locality is the housing problem. When making a decision on the design of affordable housing construction is one of the most important stages in the development of the technique and economic substantiation of the project is determination of the advisability and effectiveness of construction. The substantiation of advisability and effectiveness of affordable housing based on the definition of technical and economic indicators of projects, one of the most important among them is the cost, in its calculation is necessary to take into account the influence of organizational and technological factors, reflecting the features of construction in condition of compacted construction. Purpose. Development of methodical recommendations on substantiation of cost construction of affordable housing in the conditions of compacted construction. Conclusion. To provide a processing and the analysis of data is necessary development of the applied software on the basis of the developed block scheme of justification of cost construction of affordable housing.

  15. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  16. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  17. Efficiency and Cost Analysis of Cell Saver Auto Transfusion System in Total Knee Arthroplasty

    Directory of Open Access Journals (Sweden)

    Mustafa Gökhan Bilgili

    2014-06-01

    Full Text Available Background: Blood loss and replacement is still a controversial issue in major orthopaedic surgery. Allogenic blood transfusion may cause legal problems and concerns regarding the transmission of transfusion-related diseases. Cellsaver Systems (CSS were developed as an alternative to allogenic transfusion but CSS transfusion may cause coagulation, infection and haemodynamic instability. Aims: Our aim was to analyse the efficiency and cost analysis of a cell saver auto-transfusion system in the total knee arthroplasty procedure. Study Design: Retrospective comparative study. Methods: Those patients who were operated on by unilateral, cemented total knee arthroplasty (TKA were retrospectively evaluated. Group 1 included 37 patients who were treated using the cell saver system, and Group 2 involved 39 patients who were treated by allogenic blood transfusion. The groups were compared in terms of preoperative haemoglobin and haematocrit levels, blood loss and transfusion amount, whether allogenic transfusion was made, degree of deformity, body mass index and cost. Results: No significant results could be obtained in the statistical comparisons made in terms of the demographic properties, deformity properties, preoperative laboratory values, transfusion amount and length of hospital stay of the groups. Average blood loss was calculated to be less in Group 1 (p<0.05 and cost was higher in Group 1 (p<0.05. Conclusion: Cell saver systems do not decrease the amount of allogenic blood transfusion and costs more. Therefore, the routine usage of the auto-transfusion systems is a controversial issue. Cell saver system usage does not affect allogenic blood transfusion incidence or allogenic blood transfusion volume. It was found that preoperative haemoglobin and body mass index rates may affect allogenic blood transfusion. Therefore, it is foreseen that auto-transfusion systems could be useful in patients with low haemoglobin level and body mass index.

  18. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  19. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  20. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  1. Predictors for total medical costs for acute hemorrhagic stroke patients transferred to the rehabilitation ward at a regional hospital in Taiwan.

    Science.gov (United States)

    Chen, Chien-Min; Ke, Yen-Liang

    2016-02-01

    One-third of the acute stroke patients in Taiwan receive rehabilitation. It is imperative for clinicians who care for acute stroke patients undergoing inpatient rehabilitation to identify which medical factors could be the predictors of the total medical costs. The aim of this study was to identify the most important predictors of the total medical costs for first-time hemorrhagic stroke patients transferred to inpatient rehabilitation using a retrospective design. All data were retrospectively collected from July 2002 to June 2012 from a regional hospital in Taiwan. A stepwise multivariate linear regression analysis was used to identify the most important predictors for the total medical costs. The medical records of 237 patients (137 males and 100 females) were reviewed. The mean total medical cost per patient was United States dollar (USD) 5939.5 ± 3578.5.The following were the significant predictors for the total medical costs: impaired consciousness [coefficient (B), 1075.7; 95% confidence interval (CI) = 138.5-2012.9], dysphagia [coefficient (B), 1025.8; 95% CI = 193.9-1857.8], number of surgeries [coefficient (B), 796.4; 95% CI = 316.0-1276.7], pneumonia in the neurosurgery ward [coefficient (B), 2330.1; 95% CI = 1339.5-3320.7], symptomatic urinary tract infection (UTI) in the rehabilitation ward [coefficient (B), 1138.7; 95% CI = 221.6-2055.7], and rehabilitation ward stay [coefficient (B), 64.9; 95% CI = 31.2-98.7] (R(2) = 0.387). Our findings could help clinicians to understand that cost reduction may be achieved by minimizing complications (pneumonia and UTI) in these patients.

  2. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  3. [A cost-benefit analysis of a Mexican food-support program].

    Science.gov (United States)

    Ventura-Alfaro, Carmelita E; Gutiérrez-Reyes, Juan P; Bertozzi-Kenefick, Stefano M; Caldés-Gómez, Natalia

    2011-06-01

    Objective Presenting an estimate of a Mexican food-support program (FSP) program's cost transfer ratio (CTR) from start-up (2003) to May 2005. Methods The program's activities were listed by constructing a time allocation matrix to ascertain how much time was spent on each of the program's activities by the personnel so involved. Another cost matrix was also constructed which was completed with information from the program's accountancy records. The program's total cost, activity cost and the value of given FSP transfers were thus estimated. Results Food delivery CRT for 2003, 2004 and 2005 was 0.150, 0.218, 0.230, respectively; cash CTR was 0.132in 2004 and 0.105 in 2005. Conclusion Comparing CTR values according to transfer type is a good way to promote discussion related to this topic; however, the decision for making a transfer does not depend exclusively on efficiency but on both mechanisms' effectiveness.

  4. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  5. A Methodology for Constructing Marginal Abatement Cost Curves for Climate Action in Cities

    Directory of Open Access Journals (Sweden)

    Nadine Ibrahim

    2016-03-01

    Full Text Available As drivers of climate action, cities are taking measures to reduce greenhouse gas (GHG emissions, which if left unabated pose a challenge to meeting long-term climate targets. The economics of climate action needs to be at the forefront of climate dialogue to prioritize investments among competing mitigation measures. A marginal abatement cost (MAC curve is an effective visualization of climate action that initiates a technical and economic discussion of the cost-effectiveness and abatement potential of such actions among local leaders, policy makers, and climate experts. More commonly demonstrated for countries, MAC curves need to be developed for cities because of their heterogeneity, which vary in their urban activities, energy supply, infrastructure stock, and commuting patterns. The methodology for constructing bottom-up MAC curves for cities is presented for technologies that offer fuel switching and/or energy efficiencies, while considering technology lifetimes, city-specific electricity and fuel prices, and emission intensities. Resulting MAC curves are unique to every city, and chart the pathway towards low-carbon growth by prioritizing measures based on cost-effectiveness. A case study of Toronto’s climate targets demonstrates the prioritization of select technologies. Leveraging MAC curves to support climate programs enables cities to strategically invest in financing climate action and designing incentives.

  6. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  7. Design, construction and commissioning of a simple, low cost permanent magnet quadrupole doublet

    International Nuclear Information System (INIS)

    Conard, E.M.; Parcell, S.K.; Arnott, D.W.

    1999-01-01

    In the framework of new beam line developments at the Australian National Medical Cyclotron, a permanent magnet quadrupole doublet was designed and built entirely in house. The design proceeded from the classical work by Halbach et al. but emphasised the 'low cost' aspect by using simple rectangular NdFeB blocks and simple assembly techniques. Numerical simulations using the (2-D) Gemini code were performed to check the field strength and homogeneity predictions of analytical calculations. This paper gives the reasons for the selection of a permanent magnet, the design and construction details of the quadrupole doublet and its field measurement results. (authors)

  8. Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh

    Science.gov (United States)

    Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris

    2018-05-01

    Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.

  9. $35 billion habit: will nuclear cost overruns bankrupt the utilities

    International Nuclear Information System (INIS)

    Morgan, R.E.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) has proposed some 150 modifications in the design and operation of nuclear power plants as a result of the accident at Three Mile Island. The Atomic Industrial Forum estimates the total cost of the NRC's proposed rule changes at $35.5 billion ($3.5 billion in capital costs for the entire industry, and $32 billion in outage and construction-delay costs to the utilities) for existing facilities and for those with construction well underway. The changes range from improved training for reactor workers to a major overhaul of the reactor-containment design. The nuclear industry is asking the NRC to modify the proposals citing excessive costs (like the $100 million changes needed for a plant that cost $17 million to build) and safety (some of the complex regulations may interfere with safety). Financing the changes has become a major problem for the utilities. If the regulators allow all the costs to be passed along to the consumer, the author feels electricity will be too expensive for the consumer

  10. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  11. Efficiency and cost analysis of cell saver auto transfusion system in total knee arthroplasty.

    Science.gov (United States)

    Bilgili, Mustafa Gökhan; Erçin, Ersin; Peker, Gökhan; Kural, Cemal; Başaran, Serdar Hakan; Duramaz, Altuğ; Avkan, Cevdet

    2014-06-01

    Blood loss and replacement is still a controversial issue in major orthopaedic surgery. Allogenic blood transfusion may cause legal problems and concerns regarding the transmission of transfusion-related diseases. Cellsaver Systems (CSS) were developed as an alternative to allogenic transfusion but CSS transfusion may cause coagulation, infection and haemodynamic instability. Our aim was to analyse the efficiency and cost analysis of a cell saver auto-transfusion system in the total knee arthroplasty procedure. Retrospective comparative study. Those patients who were operated on by unilateral, cemented total knee arthroplasty (TKA) were retrospectively evaluated. Group 1 included 37 patients who were treated using the cell saver system, and Group 2 involved 39 patients who were treated by allogenic blood transfusion. The groups were compared in terms of preoperative haemoglobin and haematocrit levels, blood loss and transfusion amount, whether allogenic transfusion was made, degree of deformity, body mass index and cost. No significant results could be obtained in the statistical comparisons made in terms of the demographic properties, deformity properties, preoperative laboratory values, transfusion amount and length of hospital stay of the groups. Average blood loss was calculated to be less in Group 1 (pblood transfusion and costs more. Therefore, the routine usage of the auto-transfusion systems is a controversial issue. Cell saver system usage does not affect allogenic blood transfusion incidence or allogenic blood transfusion volume. It was found that preoperative haemoglobin and body mass index rates may affect allogenic blood transfusion. Therefore, it is foreseen that auto-transfusion systems could be useful in patients with low haemoglobin level and body mass index.

  12. Autologous Stem Cell Transplantation in Patients With Multiple Myeloma: An Activity-based Costing Analysis, Comparing a Total Inpatient Model Versus an Early Discharge Model.

    Science.gov (United States)

    Martino, Massimo; Console, Giuseppe; Russo, Letteria; Meliado', Antonella; Meliambro, Nicola; Moscato, Tiziana; Irrera, Giuseppe; Messina, Giuseppe; Pontari, Antonella; Morabito, Fortunato

    2017-08-01

    Activity-based costing (ABC) was developed and advocated as a means of overcoming the systematic distortions of traditional cost accounting. We calculated the cost of high-dose chemotherapy and autologous stem cell transplantation (ASCT) in patients with multiple myeloma using the ABC method, through 2 different care models: the total inpatient model (TIM) and the early-discharge outpatient model (EDOM) and compared this with the approved diagnosis related-groups (DRG) Italian tariffs. The TIM and EDOM models involved a total cost of €28,615.15 and €16,499.43, respectively. In the TIM model, the phase with the greatest economic impact was the posttransplant (recovery and hematologic engraftment) with 36.4% of the total cost, whereas in the EDOM model, the phase with the greatest economic impact was the pretransplant (chemo-mobilization, apheresis procedure, cryopreservation, and storage) phase, with 60.4% of total expenses. In an analysis of each episode, the TIM model comprised a higher absorption than the EDOM. In particular, the posttransplant represented 36.4% of the total costs in the TIM and 17.7% in EDOM model, respectively. The estimated reduction in cost per patient using an EDOM model was over €12,115.72. The repayment of the DRG in Calabrian Region for the ASCT procedure is €59,806. Given the real cost of the transplant, the estimated cost saving per patient is €31,190.85 in the TIM model and €43,306.57 in the EDOM model. In conclusion, the actual repayment of the DRG does not correspond to the real cost of the ASCT procedure in Italy. Moreover, using the EDOM, the cost of ASCT is approximately the half of the TIM model. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  14. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  15. Risk Factors Influencing Construction Procurement Performance in Nigeria

    Directory of Open Access Journals (Sweden)

    Alhassan Dahiru

    2015-08-01

    Full Text Available One of the challenges facing construction procurement performance is the failure to determine the risk related factors limiting its success. These risk factors can cause a significant increase in the procurement cost leading to an increase in the overall project cost. The purpose of this study is to identify and evaluate the risk factors influencing construction procurement performance with a view to achieve the overall project performance. The objectives are to establish a relative significance index score for the most important risk factors limiting the procurement performance of the projects. A self administered questionnaire was employed to the construction industry professionals for responses. A total of 78 questionnaires were distributed to these professionals (architects, quantity surveyors, engineers, and contractors but 62 were returned and analyzed using influential index and later ranked in order of importance. Results of the analysis indicate a disparity in terms of ranking of the factors influencing construction procurement performance. Corruption related risk, conflict of interest, ineffective project technical feasibility, and lack of commitment to transparency were found to be the most significant factors limiting construction procurement performance. Communication barriers and unconfidential tender evaluation process were found to be the low weighted risk factors. The findings can serve as a supportive mechanism for risks management in public construction procurement management. Therefore, construction procurement personnel at all levels of government may find this study relevant, while improving construction procurement performance in the country. It is recommended that construction procurement system should be focused on risks related to corruption, conflict of interest, and effective technical feasibility for improving the overall project performance.

  16. Main influence factors on the final energy generation cost of a nuclear power plant in comparison with other energy sources

    International Nuclear Information System (INIS)

    Souza, J.A.M. de; Glardon, C.; Schmidt, R.M.

    1981-01-01

    The main factors in the construction and in the operation of nuclear power plants that affect the final energy generation cost are presented. The structure of the energy generation cost, of the nuclear fuel cost and the total investment are studied. (E.G.) [pt

  17. Skilled Nursing Facility Partnerships May Decrease 90-Day Costs in a Total Joint Arthroplasty Episode Under the Bundled Payments for Care Improvement Initiative.

    Science.gov (United States)

    Behery, Omar A; Kouk, Shalen; Chen, Kevin K; Mullaly, Kathleen A; Bosco, Joseph A; Slover, James D; Iorio, Richard; Schwarzkopf, Ran

    2018-03-01

    The Bundled Payments for Care Improvement initiative was developed to reduce costs associated with total joint arthroplasty through a single payment for all patient care from index admission through a 90-day post-discharge period, including care at skilled nursing facilities (SNFs). The aim of this study is to investigate whether forming partnerships between hospitals and SNFs could lower the post-discharge costs. We hypothesize that institutionally aligned SNFs have lower post-discharge costs than non-aligned SNFs. A cohort of 615 elective, primary total hip and knee arthroplasty subjects discharged to an SNF under the Bundled Payments for Care Improvement from 2014 to 2016 were included in our analysis. Patients were grouped into one of the 3 categories of SNF alignment: group 1: non-partners; group 2: agreement-based partners; group 3: institution-owned partners. Demographics, comorbidities, length of stay (LOS) at SNF, and associated costs during the 90-day post-operative period were compared between the 3 groups. Mean index hospital LOS was statistically shortest in group 3 (mean 2.7 days vs 3.5 for groups 1 and 2, P = .001). SNF LOS was also shortest in group 3 (mean 11 days vs 19 and 21 days in groups 2 and 1 respectively, P Total SNF costs and total 90-day costs were both significantly lower in group 3 compared with groups 1 and 2 (P total 90-day costs, without increased risk of readmissions, compared with other SNFs. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  19. The cost of post-operative shed blood salvage after total knee arthroplasty: an analysis of 1,093 consecutive procedures

    Science.gov (United States)

    Muñoz, Manuel; Ariza, Daniel; Campos, Arturo; Martín-Montañez, Elisa; Pavía, José

    2013-01-01

    Background Requirements for allogeneic red cell transfusion after total knee arthroplasty are still high (20–50%), and salvage and reinfusion of unwashed, filtered post-operative shed blood is an established method for reducing transfusion requirements following this operation. We performed a cost analysis to ascertain whether this alternative is likely to be cost-effective. Materials and methods Data from 1,093 consecutive primary total knee arthroplasties, managed with (reinfusion group, n=763) or without reinfusion of unwashed salvaged blood (control group, n=330), were retrospectively reviewed. The costs of low-vacuum drains, shed blood collection canisters (Bellovac ABT®, Wellspect HealthCare and ConstaVac CBC II®, Stryker), shed blood reinfusion, acquisition and transfusion of allogeneic red cell concentrate, haemoglobin measurements, and prolonged length of hospital stay were used for the blood management cost analysis. Results Patients in the reinfusion group received 152±64 mL of red blood cells from postoperatively salvaged blood, without clinically relevant incidents, and showed a lower allogeneic transfusion rate (24.5% vs 8.5%, for the control and reinfusion groups, respectively; p =0.001). There were no differences in post-operative infection rates. Patients receiving allogeneic transfusions stayed in hospital longer (+1.9 days [95% CI: 1.2 to 2.6]). As reinfusion of unwashed salvaged blood reduced the allogeneic transfusion rate, both reinfusion systems may provide net savings in different cost scenarios (€ 4.6 to € 106/patient for Bellovac ABT, and € −51.9 to € 49.9/patient for ConstaVac CBCII). Discussion Return of unwashed salvaged blood after total knee arthroplasty seems to save costs in patients with pre-operative haemoglobin between 12 and 15 g/dL. It is not cost-saving in patients with a pre-operative haemoglobin >15 g/dL, whereas in those with a pre-operative haemoglobin cost-saving, its efficacy could be increased by

  20. Using Electromagnetic Algorithm for Total Costs of Sub-contractor Optimization in the Cellular Manufacturing Problem

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shahriari

    2016-12-01

    Full Text Available In this paper, we present a non-linear binary programing for optimizing a specific cost in cellular manufacturing system in a controlled production condition. The system parameters are determined by the continuous distribution functions. The aim of the presented model is to optimize the total cost of imposed sub-contractors to the manufacturing system by determining how to allocate the machines and parts to each seller. In this system, DM could control the occupation level of each machine in the system. For solving the presented model, we used the electromagnetic meta-heuristic algorithm and Taguchi method for determining the optimal algorithm parameters.

  1. Modular construction approach for advanced nuclear plants

    International Nuclear Information System (INIS)

    Johnson, F.T.; Orr, R.S.; Boudreaux, C.P.

    1988-01-01

    Modular construction has been designated as one of the major features of the AP600 program, a small innovative 600-MW (electric) advanced light water reactor (ALWR) that is currently being developed by Westinghouse and its subcontractors. This program is sponsored by the US Department of Energy (DOE) in conjunction with several other DOE and Electric Power Research Institute ALWR programs. Two major objectives of the AP600 program are as follows: (1) to provide a cost of power competitive with other power generation alternatives; and (2) to provide a short construction schedule that can be met with a high degree of certainty. The AP600 plant addresses these objectives by providing a simplified plant design and an optimized plant arrangement that result in a significant reduction in the number and size of systems and components, minimizes the overall building volumes, and consequently reduces the required bulk quantities. However, only by adopting a modular construction approach for the AP600 can the full cost and schedule benefits be realized from the advances made in the plant systems design and plant arrangement. Modularization is instrumental in achieving both of the above objectives, but most of all, a total modularization approach is considered absolutely essential to ensure that an aggressive construction schedule can be met with a high degree of certainty

  2. Construction delays causing risks on time and cost - a critical review

    Directory of Open Access Journals (Sweden)

    Chidambaram Ramanathan

    2012-02-01

    Full Text Available There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

  3. The construction and operation of a low-cost poultry waste digester.

    Science.gov (United States)

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  4. Associations between preoperative physical therapy and post-acute care utilization patterns and cost in total joint replacement.

    Science.gov (United States)

    Snow, Richard; Granata, Jaymes; Ruhil, Anirudh V S; Vogel, Karen; McShane, Michael; Wasielewski, Ray

    2014-10-01

    Health-care costs following acute hospital care have been identified as a major contributor to regional variation in Medicare spending. This study investigated the associations of preoperative physical therapy and post-acute care resource use and its effect on the total cost of care during primary hip or knee arthroplasty. Historical claims data were analyzed using the Centers for Medicare & Medicaid Services Limited Data Set files for Diagnosis Related Group 470. Analysis included descriptive statistics of patient demographic characteristics, comorbidities, procedures, and post-acute care utilization patterns, which included skilled nursing facility, home health agency, or inpatient rehabilitation facility, during the ninety-day period after a surgical hospitalization. To evaluate the associations, we used bivariate and multivariate techniques focused on post-acute care use and total episode-of-care costs. The Limited Data Set provided 4733 index hip or knee replacement cases for analysis within the thirty-nine-county Medicare hospital referral cluster. Post-acute care utilization was a significant variable in the total cost of care for the ninety-day episode. Overall, 77.0% of patients used post-acute care services after surgery. Post-acute care utilization decreased if preoperative physical therapy was used, with only 54.2% of the preoperative physical therapy cohort using post-acute care services. However, 79.7% of the non-preoperative physical therapy cohort used post-acute care services. After adjusting for demographic characteristics and comorbidities, the use of preoperative physical therapy was associated with a significant 29% reduction in post-acute care use, including an $871 reduction of episode payment driven largely by a reduction in payments for skilled nursing facility ($1093), home health agency ($527), and inpatient rehabilitation ($172). The use of preoperative physical therapy was associated with a 29% decrease in the use of any post-acute care

  5. Research on goal-setting method of rock drivage based on the balance among period, cost and quality

    Institute of Scientific and Technical Information of China (English)

    SHAN Ren-liang; CAI Wei-ling; WANG Yu-bao; LI Dong-gang; CHEN Xiang

    2012-01-01

    On the basis of the analysis on the disadvantages of the original goal-serting about rock drivage,this paper defined the "life cycle quality".With project management theory and the Cobb-Douglas finction,"quality-cost and quality-price curve model" and the "total cost-period prediction model" were built.Then the goal-setting method of the balance among quality,cost and period of rock drivage was constructed by finding "life cycle cost" through "life cycle quality" using "quality-cost andquality-price curve model" and ensuring period through "life cycle cost" using "total cost-period prediction model" (hereinafter referred to as the "three goals balance method")."Value contribution" which is the value of the contribution to a mine because of rock drivage,was found in the process of constructing the "quality-cost and quality-price curve model".An industrial test was done in coal mine A with the research results,staff footage efficiency improved by 24.24%,the period shortened by 14.3%,the "life cycle cost" dropped by 2.09%,the "life cycle quality price" improved by 3.29%,and value contribution increased by 25.3%.The result shows that the new goal method setting on the basis of coal mine profit maximization can ensure construction period.At the same time,it can realize cost and quality objectives and the optimization and balance of relationship among them; rewarding excavation teams by "value contribution" can combine organizational goal with personal goal,it significantly raise the employee's work efficiency.

  6. Comparison of Different Assembling Techniques Regarding Cost, Durability, and Ecology - A Survey of Multi-layer Wooden Panel Assembly Load-Bearing Construction Elements

    Directory of Open Access Journals (Sweden)

    Dietrich Buck

    2015-10-01

    Full Text Available Wood is a pure, sustainable, renewable material. The increasing use of wood for construction can improve its sustainability. There are various techniques to assemble multi-layer wooden panels into prefabricated, load-bearing construction elements. However, comparative market and economy studies are still scarce. In this study, the following assembling techniques were compared: laminating, nailing, stapling, screwing, stress laminating, doweling, dovetailing, and wood welding. The production costs, durability, and ecological considerations were presented. This study was based on reviews of published works and information gathered from 27 leading wood product manufacturing companies in six European countries. The study shows that the various techniques of assembling multi-layer wooden construction panel elements are very different. Cross laminated timber (CLT exhibited the best results in terms of cost and durability. With regard to ecological concerns, dovetailing is the best. Taking into account both durability and ecological considerations, wooden screw-doweling is the best. These alternatives give manufacturers some freedom of choice regarding the visibility of surfaces and the efficient use of lower-quality timber. CLT is the most cost-effective, is not patented, and is a well-established option on the market today.

  7. The true costs of participatory sanitation: Evidence from community-led total sanitation studies in Ghana and Ethiopia.

    Science.gov (United States)

    Crocker, Jonny; Saywell, Darren; Shields, Katherine F; Kolsky, Pete; Bartram, Jamie

    2017-12-01

    Evidence on sanitation and hygiene program costs is used for many purposes. The few studies that report costs use top-down costing methods that are inaccurate and inappropriate. Community-led total sanitation (CLTS) is a participatory behavior-change approach that presents difficulties for cost analysis. We used implementation tracking and bottom-up, activity-based costing to assess the process, program costs, and local investments for four CLTS interventions in Ghana and Ethiopia. Data collection included implementation checklists, surveys, and financial records review. Financial costs and value-of-time spent on CLTS by different actors were assessed. Results are disaggregated by intervention, cost category, actor, geographic area, and project month. The average household size was 4.0 people in Ghana, and 5.8 people in Ethiopia. The program cost of CLTS was $30.34-$81.56 per household targeted in Ghana, and $14.15-$19.21 in Ethiopia. Most program costs were from training for three of four interventions. Local investments ranged from $7.93-$22.36 per household targeted in Ghana, and $2.35-$3.41 in Ethiopia. This is the first study to present comprehensive, disaggregated costs of a sanitation and hygiene behavior-change intervention. The findings can be used to inform policy and finance decisions, plan program scale-up, perform cost-effectiveness and benefit studies, and compare different interventions. The costing method is applicable to other public health behavior-change programs. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  8. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  9. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  10. Design and construction of solidification and dewatering facility at Alabama Power Company's Farley Nuclear Plant

    International Nuclear Information System (INIS)

    Farnsworth, P.

    1988-01-01

    The approximate total cost of the structure and supporting piping systems is estimated to be 4.1 million dollars. Total dose savings per year could be as high as 70 man Rem for resin processing alone. The ability to store refueling equipment, process contaminated oils, load and unload trucks and containers regardless of weather conditions and support repair work on equipment greatly enhances the cost effectiveness of the project. It will take at least one year of operation of the facility to accurately assess the true cost savings to Alabama Power Company. The morale factor for the Waste and Decon Group has escalated measurably due to the dose reduction to our personnel. Plant and company management are well pleased due to the possibility of a spill or release to the environment has been eliminated which was on intangible cost. Facility construction has been completed as of this date and resin transfer anticipated within the next few days. Some of the problems encountered in planning and constructing this solidification and dewatering facility are presented. A safety evaluation for the facility is included in the appendix

  11. Reducing Length of Stay, Direct Cost, and Readmissions in Total Joint Arthroplasty Patients With an Outcomes Manager-Led Interprofessional Team.

    Science.gov (United States)

    Arana, Melissa; Harper, Licia; Qin, Huanying; Mabrey, Jay

    The purpose of this quality improvement project was to determine whether an outcomes manager-led interprofessional team could reduce length of stay and direct cost without increasing 30-day readmission rates in the total joint arthroplasty patient population. The goal was to promote interprofessional relationships combined with collaborative practice to promote coordinated care with improved outcomes. Results from this project showed that length of stay (total hip arthroplasty [THA] reduced by 0.4 days and total knee arthroplasty [TKA] reduced by 0.6 days) and direct cost (THA reduced by $1,020 per case and TKA reduced by $539 per case) were significantly decreased whereas 30-day readmission rates of both populations were not significantly increased.

  12. Social profile and cost analysis of deep infection following total hip replacement surgery

    Directory of Open Access Journals (Sweden)

    Vera Lucia Frazão

    Full Text Available ABSTRACT OBJECTIVE: To characterize the socio-economic and demographic profile of patients undergoing surgery for revision total hip arthroplasty regarding the diagnosis of deep prosthetic infection. METHODS: Twenty patients were retrospectively studied, admitted in the period between 2009 and 2010 by the Hip Surgery Group with the diagnosis of deep prosthetic infection, whose proposed treatment was surgical. This study was carried out in the presence of the patient by completing two forms applied by the social worker of the Group. RESULTS: In a 20-patient sample, 40% were male, 45% were working age, 50% of patients originated from the capital, 85% depended on benefits, 70% were retired, 60% of patients were from this hospital, and 40% were from other services. The average cost of patients to the public system was R$ 55,821.62 per patient and the total spent on treatment of patients in the study exceeded one million Brazilian reals, totalling R$ 1,116,432.40. CONCLUSION: Infection from total hip arthroplasty generates a major expense to the social security system and to the public healthcare system. Physicians must always be alert to the possible risk factors and perioperative care, striving to minimize this complication.

  13. THE IMPACT OF ORGANIZATIONAL AND TECHNOLOGICAL FACTORS ON THE EXPENSE STRUCTURE OF THE GRAIN STORAGES CONSTRUCTION ENTERPRISE

    Directory of Open Access Journals (Sweden)

    MENEJLYUK A. I.

    2016-12-01

    Full Text Available Formulation of the problem. The deficit of grain storage capacities in Ukraine is about 15-20 mln. tons. Specific conditions of the realization of grain storage construction projects require systemic research to improve the efficiency of organizational and technological solutions in the management of specialized companies, to reduce costs of construction works and to increase the profit margin. Purpose. Research changes in the structure and the amount of the total production costs of the grain storage construction enterprise under the influence of organizational and technological factors. Conclusion. The account of features of grain storage construction, as well as developed research methodology: have resulted in analysis and the construction of a computer model of the operating activity of the grain storage construction enterprise; have allowed exploring experimental and statistical regularities of indicators changes of such operating activity from the influence of organizational and technological factors.

  14. Total cost of ownership of electric vehicles compared to conventional vehicles: A probabilistic analysis and projection across market segments

    International Nuclear Information System (INIS)

    Wu, Geng; Inderbitzin, Alessandro; Bening, Catharina

    2015-01-01

    While electric vehicles (EV) can perform better than conventional vehicles from an environmental standpoint, consumers perceive them to be more expensive due to their higher capital cost. Recent studies calculated the total cost of ownership (TCO) to evaluate the complete cost for the consumer, focusing on individual vehicle classes, powertrain technologies, or use cases. To provide a comprehensive overview, we built a probabilistic simulation model broad enough to capture most of a national market. Our findings indicate that the comparative cost efficiency of EV increases with the consumer's driving distance and is higher for small than for large vehicles. However, our sensitivity analysis shows that the exact TCO is subject to the development of vehicle and operating costs and thus uncertain. Although the TCO of electric vehicles may become close to or even lower than that of conventional vehicles by 2025, our findings add evidence to past studies showing that the TCO does not reflect how consumers make their purchase decision today. Based on these findings, we discuss policy measures that educate consumers about the TCO of different vehicle types based on their individual preferences. In addition, measures improving the charging infrastructure and further decreasing battery cost are discussed. - Highlights: • Calculates the total cost of ownership across competing vehicle technologies. • Uses Monte Carlo simulation to analyse distributions and probabilities of outcomes. • Contains a comprehensive assessment across the main vehicle classes and use cases. • Indicates that cost efficiency of technology depends on vehicle class and use case. • Derives specific policy measures to facilitate electric vehicle diffusion

  15. A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.

    2007-01-01

    We present a reactor-by-reactor analysis of historical busbar costs for 99 nuclear reactors in the United States, and compare those costs with recent projections for next-generation US reactors. We argue that cost projections far different from median historical costs require more justification than estimates that lie close to those medians. Our analysis suggests that some recent projections of capital costs, construction duration, and total operations and maintenance costs are quite low-far enough from the historical medians that additional scrutiny may be required to justify using such estimates in current policy discussions and planning

  16. Improving NAVFAC's total quality management of construction drawings with CLIPS

    Science.gov (United States)

    Antelman, Albert

    1991-01-01

    A diagnostic expert system to improve the quality of Naval Facilities Engineering Command (NAVFAC) construction drawings and specification is described. C Language Integrated Production System (CLIPS) and computer aided design layering standards are used in an expert system to check and coordinate construction drawings and specifications to eliminate errors and omissions.

  17. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  18. Functional and oncologic outcomes after excision of the total femur in primary bone tumors: Results with a low cost total femur prosthesis

    Directory of Open Access Journals (Sweden)

    Ajay Puri

    2012-01-01

    Full Text Available Background: The extent of tumor may necessitate resection of the complete femur rarely to achieve adequate oncologic clearance in bone sarcomas. We present our experience with reconstruction in such cases using an indigenously manufactured, low-cost, total femoral prosthesis (TFP. We assessed the complications of the procedure, the oncologic and functional outcomes, and implant survival. Materials and Methods: Eight patients (four males and four females with a mean age of 32 years, operated between December 2003 and June 2009, had a TFP implanted. The diagnosis included osteogenic sarcoma (5, Ewing′s sarcoma (1, and chondrosarcoma (2. Mean followup was 33 months (9-72 months for all and 40 months (24-72 months in survivors. They were evaluated by Musculoskeletal Tumor Society score, implant survival as well as patient survival. Results: There was one local recurrence and five of seven patients are currently alive at the time of last followup. The Musculoskeletal Tumor Society score for patients ranged from 21 to 25 with a mean of 24 (80%. The implant survival was 88% at 5 years with only one TFP needing removal because of infection. Conclusions: A TFP in appropriately indicated patients with malignant bone tumors is oncologically safe. A locally manufactured, cost-effective implant provided consistent and predictable results after excision of the total femur with good functional outcomes.

  19. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  20. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  1. Construction of a low cost wind energy generator; Construcao de um gerador de energia eolica de baixo custo

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Jonathan Penha de; Almeida, Silvio Carlos Anibal de [Universidade Federal do Rio de Janeiro (DEM/EP/UFRJ), RJ (Brazil). Escola Politecnica. Dept. de Engenharia Mecanica], Emails: jonathan_penha@poli.ufrj.br, silvioa@gmail.com

    2010-07-01

    This project presents a low cost wind electric power generator constituted of cheap and easy access materials. The necessary materials are presented for it construction and the expected efficiency, having as reference the city of Fernando de Noronha, Brazil. The elaboration of the generator was initially developed as alternative energy source during blackout.

  2. Cost of goods sold and total cost of delivery for oral and parenteral vaccine packaging formats.

    Science.gov (United States)

    Sedita, Jeff; Perrella, Stefanie; Morio, Matt; Berbari, Michael; Hsu, Jui-Shan; Saxon, Eugene; Jarrahian, Courtney; Rein-Weston, Annie; Zehrung, Darin

    2018-03-14

    Despite limitations of glass packaging for vaccines, the industry has been slow to implement alternative formats. Polymer containers may address many of these limitations, such as breakage and delamination. However, the ability of polymer containers to achieve cost of goods sold (COGS) and total cost of delivery (TCOD) competitive with that of glass containers is unclear, especially for cost-sensitive low- and lower-middle-income countries. COGS and TCOD models for oral and parenteral vaccine packaging formats were developed based on information from subject matter experts, published literature, and Kenya's comprehensive multiyear plan for immunization. Rotavirus and inactivated poliovirus vaccines (IPV) were used as representative examples of oral and parenteral vaccines, respectively. Packaging technologies evaluated included glass vials, blow-fill-seal (BFS) containers, preformed polymer containers, and compact prefilled auto-disable (CPAD) devices in both BFS and preformed formats. For oral vaccine packaging, BFS multi-monodose (MMD) ampoules were the least expensive format, with a COGS of $0.12 per dose. In comparison, oral single-dose glass vials had a COGS of $0.40. BFS MMD ampoules had the lowest TCOD of oral vaccine containers at $1.19 per dose delivered, and ten-dose glass vials had a TCOD of $1.61 per dose delivered. For parenteral vaccines, the lowest COGS was achieved with ten-dose glass vials at $0.22 per dose. In contrast, preformed CPAD devices had the highest COGS at $0.60 per dose. Ten-dose glass vials achieved the lowest TCOD of the parenteral vaccine formats at $1.56 per dose delivered. Of the polymer containers for parenteral vaccines, BFS MMD ampoules achieved the lowest TCOD at $1.89 per dose delivered, whereas preformed CPAD devices remained the most expensive format, at $2.25 per dose delivered. Given their potential to address the limitations of glass and reduce COGS and TCOD, polymer containers deserve further consideration as alternative

  3. Low cost phantom for computed radiology; Objeto de teste de baixo custo para radiologia computadorizada

    Energy Technology Data Exchange (ETDEWEB)

    Travassos, Paulo Cesar B.; Magalhaes, Luis Alexandre G., E-mail: pctravassos@ufrj.br [Universidade do Estado do Rio de Janeiro (IBRGA/UERJ), RJ (Brazil). Laboratorio de Ciencias Radiologicas; Augusto, Fernando M.; Sant' Yves, Thalis L.A.; Goncalves, Elicardo A.S. [Instituto Nacional de Cancer (INCA), Rio de Janeiro, RJ (Brazil); Botelho, Marina A. [Hospital Universitario Pedro Ernesto (UERJ), Rio de Janeiro, RJ (Brazil)

    2012-08-15

    This article presents the results obtained from a low cost phantom, used to analyze Computed Radiology (CR) equipment. The phantom was constructed to test a few parameters related to image quality, as described in [1-9]. Materials which can be easily purchased were used in the construction of the phantom, with total cost of approximately U$100.00. A bar pattern was placed only to verify the efficacy of the grids in the spatial resolution determination, and was not included in the budget because the data was acquired from the grids. (author)

  4. The influence of architectural designers on construction ergonomics ...

    African Journals Online (AJOL)

    , the construction process generates a disproportionate number of fatalities, injuries and disease and both the direct and indirect costs contribute to the cumulative cost of construction. Designers influence construction ergonomics directly and ...

  5. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  6. The importance of capital cost reduction in improving nuclear economics

    International Nuclear Information System (INIS)

    Langmo, A.; Braun, C.

    1996-01-01

    In the developed countries having existing nuclear programs, the situation necessitates lower total power generation cost. The restructuring of utility industry due to the deregulation causes to reorganize the ownership of some nuclear plants, and the overall economics of nuclear plants in relation to their local competition is reexamined. The reluctance to make any new long term capital cost commitment arises, and it makes new plant construction less likely in near future, and plant upgrading and improvement to be put to intense scrutiny. The capital cost recovery in existing nuclear plants in USA is discussed. It is important to recognize that there is very little that can be done to affect already expended capital, and only that can be done is to improve plant capacity factors, besides write-off. The roles of architects and engineers in improved plant economics are now evaluated by the various organizations which are interested in the participation in new nuclear industry reorganization and restructuring. The reduction of operation and maintenance costs and capital investment, and the improvement of capacity factor are reported. In new ALWR construction program, architects and engineers can significantly support the control of plant capital costs by the selection of the plant design and the sites, and the strategies of procurement and contract, construction schedule and others. (K.I.)

  7. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  8. Preliminary estimate of the costs involved in the implantation of a low and medium level radioactive waste repository in Brazil

    International Nuclear Information System (INIS)

    Branco, Otavio E.A.; Carvalho Filho, Carlos A.; Ferreira, Vinicius V.M.; Alves, Paulo R.R.

    2009-01-01

    One relevant subject in the decision making process linked to the implantation of a low and intermediate level waste (LILW) repository in Brazil is regarding to the project expected costs. It is important to estimate in a solid way the total and partial costs expected, considering each one of the enterprise implantation phases. This work shows an initial estimative of these costs, based on reports and papers that evaluate the implantation, operation, closure and post closure costs of radioactive LILW waste repositories. In the development of this research only the costs regarding to near surface repositories, or similar ones, were considered. The total cost was estimated as approximately 115 million dollars, considering the whole project lifetime as 300 years. Considering the repository start-up costs (site selection, licensing, project and construction), the total value is estimated as 48 million dollars (1600 dollars/m 3 ). It is important to emphasize that some cares should be taken when costs obtained from the acquired experience by another countries in the repositories development are analyzed. As example, the costs for disposal 1 m 3 of low and medium level radioactive waste vary significantly from one country to another, even when repositories with similar projects are compared. Also the total costs of construction and licensing are significantly higher when compared those ones from 'conventional' facilities with similar technological characteristics. Finally, although about a dozen low and medium level radioactive waste repository are operating in Europe, new projects should be faced, as the international practice demonstrate, as original developments. (author)

  9. The Impact of a Suicide Prevention Strategy on Reducing the Economic Cost of Suicide in the New South Wales Construction Industry.

    Science.gov (United States)

    Doran, Christopher M; Ling, Rod; Gullestrup, Jorgen; Swannell, Sarah; Milner, Allison

    2016-03-01

    Little research has been conducted into the cost and prevention of self-harm in the workplace. To quantify the economic cost of self-harm and suicide among New South Wales (NSW) construction industry (CI) workers and to examine the potential economic impact of implementing Mates in Construction (MIC). Direct and indirect costs were estimated. Effectiveness was measured using the relative risk ratio (RRR). In Queensland (QLD), relative suicide risks were estimated for 5-year periods before and after the commencement of MIC. For NSW, the difference between the expected (i.e., using NSW pre-MIC [2008-2012] suicide risk) and counterfactual suicide cases (i.e., applying QLD RRR) provided an estimate of potential suicide cases averted in the post-MIC period (2013-2017). Results were adjusted using the average uptake (i.e., 9.4%) of MIC activities in QLD. Economic savings from averted cases were compared with the cost of implementing MIC. The cost of self-harm and suicide in the NSW CI was AU $527 million in 2010. MIC could potentially avert 0.4 suicides, 1.01 full incapacity cases, and 4.92 short absences, generating annual savings of AU $3.66 million. For every AU $1 invested, the economic return is approximately AU $4.6. MIC represents a positive economic investment in workplace safety.

  10. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  11. International Construction Measurement Standard

    OpenAIRE

    Mitchell, Charles

    2016-01-01

    The International Construction Measurement Standard Coalition (the Coalition) was formed on 17 June 2015 after meeting at the International Monetary Fund in Washington DC, USA. The Coalition, comprising the organisations listed below at the date of publication, aims to bring about consistency in construction cost reporting standards internationally. This is achieved by the creation and adoption of this ICMS, an agreed international standard for the structuring and presentation of cost reports...

  12. Influence of Organisational Culture on Total Quality Management Implementation and Firm Performance: Evidence from the Vietnamese Construction Industry

    Directory of Open Access Journals (Sweden)

    Panuwatwanich Kriengsak

    2017-03-01

    Full Text Available The main purpose of this study is to examine the relationship between organisational culture (OC and Total Quality Management (TQM, and the influence of TQM implementation on organisational performance improvement within the context of the Vietnamese construction industry. A survey was conducted with 104 respondents from Vietnamese construction firms, using validated survey instruments developed in past research. Analysis techniques include cluster analysis and Structural Equation Modelling. Findings showed that Vietnamese construction firms are dominated by clan and hierarchy cultures rather than adhocracy and market cultures according to Competing Value Framework (CVF of OC classification. Furthermore, it was found that organisations dominated by either clan or adhocracy cultures could provide a favourable environment for successful TQM implementation, whereas this is not the case for those dominated by both market and hierarchy cultures. This study also confirmed the significant and positive relationship between TQM implementation and organisational performance improvement.

  13. Total and methyl mercury concentrations in sediment and water of a constructed wetland in the Athabasca Oil Sands Region.

    Science.gov (United States)

    Oswald, Claire J; Carey, Sean K

    2016-06-01

    In the Athabasca Oil Sands Region in northeastern Alberta, Canada, oil sands operators are testing the feasibility of peatland construction on the post-mining landscape. In 2009, Syncrude Canada Ltd. began construction of the 52 ha Sandhill Fen pilot watershed, including a 15 ha, hydrologically managed fen peatland built on sand-capped soft oil sands tailings. An integral component of fen reclamation is post-construction monitoring of water quality, including salinity, fluvial carbon, and priority pollutant elements. In this study, the effects of fen reclamation and elevated sulfate levels on mercury (Hg) fate and transport in the constructed system were assessed. Total mercury (THg) and methylmercury (MeHg) concentrations in the fen sediment were lower than in two nearby natural fens, which may be due to the higher mineral content of the Sandhill Fen peat mix and/or a loss of Hg through evasion during the peat harvesting, stockpiling and placement processes. Porewater MeHg concentrations in the Sandhill Fen typically did not exceed 1.0 ng L(-1). The low MeHg concentrations may be a result of elevated porewater sulfate concentrations (mean 346 mg L(-1)) and an increase in sulphide concentrations with depth in the peat, which are known to suppress MeHg production. Total Hg and MeHg concentrations increased during a controlled mid-summer flooding event where the water table rose above the ground surface in most of the fen. The Hg dynamics during this event showed that hydrologic fluctuations in this system exacerbate the release of THg and MeHg downstream. In addition, the elevated SO4(2-) concentrations in the peat porewaters may become a problem with respect to downstream MeHg production once the fen is hydrologically connected to a larger wetland network that is currently being constructed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. A study on the economics enhancement of OPR1000 applied to advanced construction methods

    International Nuclear Information System (INIS)

    Park, Ki Jo; Yoon, Eun Sang

    2007-01-01

    OPR1000 (Optimized Power Reactor 1000MW) is a totally improved design model of Korea nuclear power plants and the latest 1,000MW nuclear power plant in the Republic of Korea. Shin Kori 1 and 2 and Shin Wolsong 1 and 2 and under construction and these are OPR1000 types. Although OPR1000 is up to data 1,000MW nuclear power plant, it is not enough to be much superior to other nuclear power plants. Under the WTO and FTA circumstance of domestic and stiff overseas competition for nuclear power plants, it is necessary to enhance the economics of OPR1000. And then, the enhanced economic alternatives are reviewed and the advanced construction methods are considered. Based on research and a comprehensive review of nuclear power plant construction experiences, an alternative application of advanced construction methods is developed and compared with existing OPR1000 for schedule and economics. In this paper, economic analyses of a construction cost and a levelized electricity generation cost are performed

  15. Analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example

    Directory of Open Access Journals (Sweden)

    Hoła Anna

    2016-01-01

    Full Text Available The paper presents analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example. The individual components of the cost of accidents have been identified. Using the statistical data published by the Central Statistical Office, the impact on the size of the cost of accidents at work of such factors as the lost time of an injured person, the lost time of other people involved in the removal of accident effects and also material losses caused by an accident, was analysed. On the basis of the conducted analysis, conclusions regarding economic losses due to accidents were formulated.

  16. Cost minimization of generation, storage, and new loads, comparing costs with and without externalities

    International Nuclear Information System (INIS)

    Noel, Lance; Brodie, Joseph F.; Kempton, Willett; Archer, Cristina L.; Budischak, Cory

    2017-01-01

    Highlights: • The study models a large regional transmission organization, with various amounts of renewable energy. • The cost of 86 million iterations of energy systems is calculated, with and without externalities. • When including externalities, society should implement 50% renewable energy. - Abstract: The goal of this research is to understand the economics of anticipated large-scale changes in the electric system. 86 million different combinations of renewable generation (wind and solar), natural gas, and three storage types (hydrogen storage, electric vehicles equipped with vehicle-to-grid (V2G) technology, and building heat) are modeled within the PJM Interconnection. The corresponding electric systems are then operated and constrained to meet the load every hour over four years. The total cost of each energy system is calculated, both with and without externalities, to find the least cost energy systems. Using today’s costs of conventional and renewable electricity and without adding any externalities, the cost-minimum system includes no renewable generation, but does include EVs. When externalities are included, however, the most cost-effective to system covers 50% of the electric load with renewable energy and runs reliably without need for either new conventional generation or purpose-built storage. The three novel energy policy implications of this research are: (1) using today’s cost of renewable electricity and estimates of externalities, it is cost effective to implement 240 GW of renewable electricity to meet 50% of the total electric load; (2) there is limited need to construct new natural gas power plants, especially from a system-wide perspective; and (3) existing coal plants may still be useful to the energy system, and instead of being retired, should be repurposed to occasionally provide generation.

  17. Cost-effectiveness of hysteroscopy screening for infertile women.

    Science.gov (United States)

    Kasius, Jenneke C; Eijkemans, René J C; Mol, Ben W J; Fauser, Bart C J M; Fatemi, Human M; Broekmans, Frank J M

    2013-06-01

    This study assessed the cost-effectiveness of office hysteroscopy screening prior to IVF. Therefore, the cost-effectiveness of two distinct strategies - hysteroscopy after two failed IVF cycles (Failedhyst) and routine hysteroscopy prior to IVF (Routinehyst) - was compared with the reference strategy of no hysteroscopy (Nohyst). When present, intrauterine pathology was treated during hysteroscopy. Two models were constructed and evaluated in a decision analysis. In model I, all patients had an increase in pregnancy rate after screening hysteroscopy prior to IVF; in model II, only patients with intrauterine pathology would benefit. For each strategy, the total costs and live birth rates after a total of three IVF cycles were assessed. For model I (all patients benefit from hysteroscopy), Routinehyst was always cost-effective compared with Nohyst or Failedhyst. For the Routinehyst strategy, a monetary profit would be obtained in the case where hysteroscopy would increase the live birth rate after IVF by ≥ 2.8%. In model II (only patients with pathology benefit from hysteroscopy), Routinehyst also dominated Failedhyst. However, hysteroscopy performance resulted in considerable costs. In conclusion, the application of a routine hysteroscopy prior to IVF could be cost-effective. However, randomized trials confirming the effectiveness of hysteroscopy are needed. Copyright © 2013 Reproductive Healthcare Ltd. Published by Elsevier Ltd. All rights reserved.

  18. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  19. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  20. The comparison of properties and cost of material use of natural rubber and sand in manufacturing cement mortar for construction sub-base layer

    Science.gov (United States)

    Rahman, R.; Nemmang, M. S.; Hazurina, Nor; Shahidan, S.; Khairul Tajuddin Jemain, Raden; Abdullah, M. E.; Hassan, M. F.

    2017-11-01

    The main issue related to this research was to examine the feasibility of natural rubber SMR 20 in the manufacturing of cement mortar for sub-base layer construction. Subbase layers have certain functions that need to be fulfilled in order to assure strong and adequate permeability of pavement performance. In a pavement structure, sub-base is below the base and serves as the foundation for the overall pavement structure, transmitting traffic loads to the sub-grade and providing drainage. Based on this research, the natural rubber, SMR 20 was with the percentages of 0%, 5%, 10% and 15% to mix with sand in the manufacture of the cement mortar. This research describes some of the properties and cost of the materials for the natural rubber and sand in cement mortar manufacturing by laboratory testing. Effects of the natural rubber replacement on mechanical properties of mortar were investigated by laboratory testing such as compressive strength test and density. This study obtained the 5% of natural rubber replaced in sand can achieved the strength of normal mortar after 7 days and 28 days. The strength of cement mortar depends on the density of cement mortar. According to the cost of both materials, sand shows the lower cost in material for the cement mortar manufacturing than the uses of natural rubber. Thus, the convectional cement mortar which used sand need lower cost than the modified rubber cement mortar and the most economical to apply in industrial. As conclusion, the percentage of 5% natural rubber in the cement mortar would have the same with normal cement mortar in terms of the strength. However, in terms of the cost of the construction, it will increase higher than cost of normal cement mortar production. So that, this modified cement mortar is not economical for the road sub-base construction.

  1. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  2. Construction, Maintenance and Repair as Elements in Rubble Mound Breakwater Design

    DEFF Research Database (Denmark)

    Burcharth, Hans F.; Rietveld, C.F.W.

    Very often rubble mound breakwater designs seem to be a result only of stability considerations corresponding to design wave conditions. Designers tend to put too little emphasis on practical problems related to construction, maintenance and repair. As is discussed in the paper due consideration...... of these problems Ieeds to a more economical design in terms of lower total costs during the structural lifetime....

  3. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  4. Construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Jicha, J.

    1989-01-01

    The Temelin nuclear power plant with four WWER-1000 reactors is designed to supply electricity in an amount of 23 TWh/yr and heat in an amount of 8000 TJ/yr in the first stage. The maximum heat extraction should be 922 MW. The plant construction includes the building of 10 buildings, the total cost being 52 thousand million Czechoslovak crowns. Another 41 investment items are associated with the plant construction. The most important of them include constructions for leading out the electric power, for standby electricity supply for the power plant, and for the extraction of heat from the plant and its supply to the town of Ceske Budejovice. The first unit should be started up for test performance in November 1992, the second in 1994 and the whole power plant should be complete by 1998. The state of the construction by February 1989 is described in detail. Attention is also paid to the preparatory activity for the operation and to social welfare of the personnel. (Z.M.)

  5. Nuclear plant construction and investment risk

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks

  6. Application research of cost construction on radioactive waste management

    International Nuclear Information System (INIS)

    Gao Yanfeng; Bi Sheng; Liu Zhenhe

    2009-01-01

    This paper summarizes the theoretical basis systems for the cost component on radioactive waste management. Through the decomposition production of various types of project content, analysis of the cost elements of operating activities, study subjects at reason-able cost and expense. On the basis of the formation of radioactive waste management costs of the various operating structure Into, and established a comprehensive system of price system. (authors)

  7. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  8. A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2012-01-01

    Full Text Available The aim of this study is to deal with a minimum cost network flow problem (MCNFP in a large-scale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an expectation multiobjective bilevel programming model with chance constraints is formulated to incorporate decision makers’ preferences. To solve the identified special conditions, an equivalent crisp model is proposed with an additional multiobjective bilevel particle swarm optimization (MOBLPSO developed to solve the model. The Shuibuya Hydropower Project is used as a real-world example to verify the proposed approach. Results and analysis are presented to highlight the performances of the MOBLPSO, which is very effective and efficient compared to a genetic algorithm and a simulated annealing algorithm.

  9. Rock cavity construction of a nuclear power plant: a case study

    International Nuclear Information System (INIS)

    Loken, P.C.; Bakke, J.; Gloersen, I.

    1979-01-01

    The major findings of a comprehensive study of the major aspects of rock cavity construction of a large nuclear power plant are: (1) current technology is adequate for the realization of such construction; (2) a method for estimating the probability of rock fallout and gross cavity instability is presently not available; (3) certain design modifications and amplifications must be made to prevent dependent failures; (4) no significant reduction in the immediate radiological effects of Class 9 accidents will result unless special design measures are made for this purpose; (5) the vulnerability of the plant to certain external effects is significantly reduced; (6) the total time for the realization of such construction will be significantly longer than that for a traditionally constructed plant; and (7) the extra cost will be substantial

  10. Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

    Science.gov (United States)

    Vitásek, Stanislav; Matějka, Petr

    2017-09-01

    The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.

  11. The effect of elevated CO2 on the chemical composition and construction costs of leaves of 27 C3 species

    NARCIS (Netherlands)

    Poorter, H.; Berkel, Y. van; Baxter, B.; Hertog, J. den; Dijkstra, P.; Gifford, R.M.; Griffin, K.L.; Roumet, C.; Roy, J.; Wong, S.C.

    1997-01-01

    We determined the proximate chemical composition as well as the construction costs of leaves of 27 species, grown at ambient and at a twice-ambient partial pressure of atmospheric CO₂. These species comprised wild and agricultural herbaceous plants as well as tree seedlings. Both average

  12. Microalgal CO2 sequestering – Modeling microalgae production costs

    International Nuclear Information System (INIS)

    Bilanovic, Dragoljub; Holland, Mark; Armon, Robert

    2012-01-01

    Highlights: ► Microalgae production costs were modeled as a function of specific expenses. ► The effects of uncontrollable expenses/factors were incorporated into the model. ► Modeled microalgae production costs were in the range $102–1503 t −1 ha −1 y −1 . - Abstract: Microalgae CO 2 sequestering facilities might become an industrial reality if microalgae biomass could be produced at cost below $500.00 t −1 . We develop a model for estimation of total production costs of microalgae as a function of known production-specific expenses, and incorporate into the model the effects of uncontrollable factors which affect known production-specific expenses. Random fluctuations were intentionally incorporated into the model, consequently into generated cost/technology scenarios, because each and every logically interconnected equipment/operation that is used in design/construction/operation/maintenance of a production process is inevitably subject to random cost/price fluctuations which can neither be eliminated nor a priori controlled. A total of 152 costs/technology scenarios were evaluated to find 44 scenarios in which predicted total production costs of microalgae (PTPCM) was in the range $200–500 t −1 ha −1 y −1 . An additional 24 scenarios were found with PTCPM in the range of $102–200 t −1 ha −1 y −1 . These findings suggest that microalgae CO 2 sequestering and the production of commercial compounds from microalgal biomass can be economically viable venture even today when microalgae production technology is still far from its optimum.

  13. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  14. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  15. Development of Building Envelope Constructions

    DEFF Research Database (Denmark)

    Tommerup, Henrik Monefeldt; Munch-Andersen, Jørgen; Esbensen, Peter Kjær

    2000-01-01

    It is expected that the heat insulation demands in the Danish Building Regulations will be further increased around 2005, in order to reduce the heating demand and the CO2-emission. A simple increase of the insulation thickness of common wall types seems not to be attractive due to the increased...... effect of the 2-dimensional heat loss, the large wall thickness, and the costs of the wide foundation. Therefore, new types of walls have been developed. It is sought to minimise the total heat loss as well as the material consumption. The target was to come up with new walls for which the construction...

  16. Review of nuclear power costs around the world

    International Nuclear Information System (INIS)

    Bennett, L.L.; Karousakis, P.M.; Moynet, G.

    1983-01-01

    This paper presents highlights of nuclear power costs around the world from studies carried out by the IAEA and by UNIPEDE. Emphasis is placed on trends within each country of key parameters which affect both investment costs and total power generation costs, including construction and project durations, size of units, regulatory environment, scope of project, fuel cycle costs and general economic conditions. A synthesis of these trends, taking into consideration both nuclear and coal-fired plant capital and fuel costs as they are estimated to evolve in the near and medium term, is presented in terms of nuclear-to-coal cost ratios for both plant investment costs and total generating costs. The plant investment costs are expressed as ''overnight'' or ''fore'' costs, in constant money, for plants expected to enter commercial operation in the early 1990s. Pertinent assumptions are based on conditions prevailing in the particular country under review. These studies indicate that in most countries nuclear plant investment costs are rising more rapidly than the costs for coal-fired plants. A major cause for the rapid rise in nuclear plant costs is the drastic lengthening of project duration in most countries. France, as a notable exception, has been able to maintain a stable and reasonably short project time. In spite of the rapidly escalating nuclear plant investment costs, nuclear electricity generation has an economic advantage over coal in Europe and Canada and is competitive with coal in the eastern and midwestern parts of the United States of America (USA). The availability of abundant, low-cost coal gives coal-fired generation an economic advantage in the western USA. (author)

  17. Design, Construction, and Modeling of a 252Cf Neutron Irradiator

    Directory of Open Access Journals (Sweden)

    Blake C. Anderson

    2016-01-01

    Full Text Available Neutron production methods are an integral part of research and analysis for an array of applications. This paper examines methods of neutron production, and the advantages of constructing a radioisotopic neutron irradiator assembly using 252Cf. Characteristic neutron behavior and cost-benefit comparative analysis between alternative modes of neutron production are also examined. The irradiator is described from initial conception to the finished design. MCNP modeling shows a total neutron flux of 3 × 105 n/(cm2·s in the irradiation chamber for a 25 μg source. Measurements of the gamma-ray and neutron dose rates near the external surface of the irradiator assembly are 120 μGy/h and 30 μSv/h, respectively, during irradiation. At completion of the project, total material, and labor costs remained below $50,000.

  18. Cost-Effectiveness Analysis of Total Hip Arthroplasty Performed by a Canadian Short-Stay Surgical Team in Ecuador.

    Science.gov (United States)

    Schlegelmilch, Michael; Rashiq, Saifee; Moreau, Barbara; Jarrín, Patricia; Tran, Bach; Chuck, Anderson

    2017-01-01

    Few charitable overseas surgical missions produce cost-effectiveness analyses of their work. We compared the pre- and postoperative health status for 157 total hip arthroplasty (THA) patients operated on from 2007 to 2011 attended by an annual Canadian orthopedic mission to Ecuador to determine the quality-adjusted life years (QALYs) gained. The costs of each mission are known. The cost per surgery was divided by the average lifetime QALYs gained to estimate an incremental cost-effectiveness ratio (ICER) in Canadian dollars per QALY. The average lifetime QALYs (95% CI) gained were 1.46 (1.4-1.5), 2.5 (2.4-2.6), and 2.9 (2.7-3.1) for unilateral, bilateral, and staged (two THAs in different years) operations, respectively. The ICERs were $4,442 for unilateral, $2,939 for bilateral, and $4392 for staged procedures. Seventy percent of the mission budget was spent on the transport and accommodation of volunteers. THA by a Canadian short-stay surgical team was highly cost-effective, according to criteria from the National Institute for Health and Care Excellence and the World Health Organization. We encourage other international missions to provide similar cost-effectiveness data to enable better comparison between mission types and between mission and nonmission care.

  19. The effect of elevated CO2 on the chemical composition and construction costs of leaves of 27 C-3 species

    NARCIS (Netherlands)

    Poorter, H; VanBerkel, Y; Baxter, R; DenHertog, J; Dijkstra, P; Gifford, RM; Griffin, KL; Roumet, C; Roy, J

    We determined the proximate chemical composition as well as the construction costs of leaves of 27 species, grown at ambient and at a twice-ambient partial pressure of atmospheric CO2, These species comprised wild and agricultural herbaceous plants as well as tree seedlings, Both average responses

  20. Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings

    Directory of Open Access Journals (Sweden)

    Eul-Bum Lee

    2018-03-01

    Full Text Available United States State Highway Agencies (SHAs use Incentive/Disincentives (I/D to minimize negative impacts of construction on the traveling public through construction acceleration. Current I/D practices have the following short-comings: not standardized, over- or under-compensate contractors, lack of auditability result in disincentives that leave SHAs vulnerable to contractor claims and litigation and are based on agency costs/savings rather than contractor acceleration. Presented within this paper is an eleven-step I/D valuation process. The processes incorporate a US-nationwide RUC and agency cost calculation program, CA4PRS and a time-cost tradeoff I/D process. The incentive calculation used is the summation of the contractor acceleration and a reasonable contractor bonus (based on shared agency savings with an optional reduction of contractor’s own saving from schedule compression (acceleration. The process has a capability to be used both within the US and internationally with minor modifications, relies on historical costs, is simple and is auditable and repeatable. As such, it is a practical tool for optimizing I/D amounts and bridges the gap in existing literature both by its industry applicability, integrating the solution into existing SHA practices and its foundation of contractor acceleration costs.

  1. New home construction: Eric Allen

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This report describes some special energy efficient measures incorporated in the construction of a modestly-priced two and a half storey frame house with a floor area of 108 m{sup 2}. The house was built facing south, on a south-sloping lot with a thick stand of Jack Pine on the north side. The major energy efficient measures are: continuous air-vapour barrier and high insulation level to make the house as air-tight as possible; the use of passive solar heat which is expected to supply 37% of the annual heating requirements; a crawlspace plenum which draws hot air from the top of the house and recirculates it under the first floor; and use of horizontal strapping on which all wall partitions, electrical and plumbing work was done in order not to break the continuous air-vapour barrier and which itself provides extra insulation. The cost of making the house energy efficient was $2,500. The price of the house on completion was projected to be $65,000. The cost for the energy efficiency measures is 4% of the total. The Allen house is a good example of how an investment of a small percentage of the total cost, and about 67 hours of work, can result in an energy efficient house. The resulting savings on energy bills can be quite significant and can mean a return on the investment within 5 years. 3 figs., 1 tab.

  2. High cost of nuclear power plants

    International Nuclear Information System (INIS)

    Bassett, C.

    1978-01-01

    Retroactive safety standards were found to account for over half the costs of a nuclear power plant and point up the need for an effective cost-benefit analysis of changes made by the Nuclear Regulatory Commission after construction has started. The author compared the Davis-Besse Unit No. 1 construction-cost estimates with the final-cost increases during a rate-case investigation in Ohio. He presents data furnished for ten of the largest construction contracts to illustrate the cost increases involving fixed hardware and intensive labor. The situation was found to repeat with other utilities across the country even though safeguards against irresponsible low bidding were introduced. Low bidding was found to continue, encouraged by the need for retrofitting to meet regulation changes. The average cost per kilowatt of major light-water reactors is shown to have increased from $171 in 1970 to $555 in 1977, while construction duration increased from 43.4 to 95.6 months during the same period

  3. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  4. An introduction to constructed wetlands (reed beds) sustainable low cost wastewater treatment plants

    International Nuclear Information System (INIS)

    Ahmad, M.I.

    2005-01-01

    The use of 'conventional' wastewater treatment technology (trickling filters and activated sludge) in developing countries has often been unsuccessful due to high cost, complex operating requirements and expensive maintenance procedures. Typical examples of such projects are wastewater plants in Islamabad and Karachi. Actually the conventional systems, such as trickling filters and activated sludge plants were developed to address the concerns about organic pollution of natural water bodies in western temperate climates, rather than the reduction of organic matter as well as pathogens which is often a priority in developing countries. Pakistan, being a developing country cannot and should not follow the western technology blindly but needs the use of a ppropriate technology . Appropriate technology is defined as a treatment system which meets the following criteria: Affordable: Total amount costs, including capital, operation, maintenance and depreciation are within the user's ability to pay. Operable: Operation of the system is possible with locally available labor and support. Reliable: Effluent quality requirements can be met consistently. Currently there are a limited number of appropriate technologies for small communities, which should be considered by a community and their designers. These include conventional and non-conventional systems such as stabilization ponds or lagoons, slow sand filters, land treatment systems, and wetlands (natural or constructed). The non-conventional systems often utilize 'ecological' treatment mechanism (such as aquatic systems or wetlands) and do not have the mechanical parts or energy requirements of conventional systems. Waste Stabilization Ponds are one such solution but sometimes are constrained by land availability, topography, and are not environment friendly. In such locations, natural or constructed wetlands (Reed Beds) could provide an alternative technology. It is what we call a LOW technology, rather than HI TECH

  5. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  6. Salt marsh construction costs and shrimp production

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Continuing wetland loss in Galveston Bay, Texas (USA) has led to the development of various salt marsh restoration projects. These constructed wetlands often attempt...

  7. The application of an integrated approach to design, procurement and construction in reducing overall nuclear power plant costs. Annex 19

    International Nuclear Information System (INIS)

    Didsbury, R.; Shalaby, B.A.; Torgerson, D.F.

    2002-01-01

    As part of its on-going efforts to reduce the cost of CANDU nuclear power plants, AECL has embarked on an integrated approach to design, procurement and construction activities associated with new CANDU 6 and CANDU 9 projects. The approach is predicated on the fact there is a vast quantity of information that needs to be managed and controlled over the life of a nuclear power plant project. Therefore, ensuring the completeness and correctness of all the information needed by all project participants, facilitating sharing of this information amongst the project's participants, and automating the various deliverable production processes offers significant potential not only for overall project cost (and schedule) savings but also for reducing operations and maintenance costs once the plant enters service. Facilitating and indeed of key importance to this approach is the use of a suite of integrated information technology-based engineering, procurement and project control tools used throughout the design, engineering, procurement and construction phases of the project. A unique and important feature of these tools is their high degree of integration both from a work process and a data perspective. Use of these tools is well underway on AECL's Qinshan Project which is realizing significant benefits in cost and schedule. This paper will describe the approach AECL is taking, along with the tools it has both put in place, and those additional items planned for the future along with the cost, schedule and quality benefits that arise from their use. Progress to date on the Qinshan project also will be discussed as well as the expected application to the plant once it has gone into service will also be discussed. (author)

  8. Technical support for GEIS: radioactive waste isolation in geologic formations. Volume 18. Facility construction feasibility and costs by rock type

    International Nuclear Information System (INIS)

    1978-04-01

    The results of a study that compared the general engineering feasibility and unit costs associated with sinking shafts and mining storage rooms in the four rock types (salt, granite, shale, basalt) are presented in this volume. The report includes a discussion of the general effects of rock characteristics on shaft and mine design, the application of these design considerations to the specific designs developed for the Draft GEIS, shaft and mine construction techniques, and the unit cost comparison. The repository designs upon which this comparison was based are presented in other volumes of this series

  9. Determining the True Cost to Deliver Total Hip and Knee Arthroplasty Over the Full Cycle of Care: Preparing for Bundling and Reference-Based Pricing.

    Science.gov (United States)

    DiGioia, Anthony M; Greenhouse, Pamela K; Giarrusso, Michelle L; Kress, Justina M

    2016-01-01

    The Affordable Care Act accelerates health care providers' need to prepare for new care delivery platforms and payment models such as bundling and reference-based pricing (RBP). Thriving in this environment will be difficult without knowing the true cost of care delivery at the level of the clinical condition over the full cycle of care. We describe a project in which we identified true costs for both total hip and total knee arthroplasty. With the same tool, we identified cost drivers in each segment of care delivery and collected patient experience information. Combining cost and experience information with outcomes data we already collect allows us to drive costs down while protecting outcomes and experiences, and compete successfully in bundling and RBP programs. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule

    International Nuclear Information System (INIS)

    Soli T. Khericha

    2006-01-01

    This report presents preliminary technical and functional requirements (T and FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T and FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation

  11. Techniques for cost-effective electric information sharing; Cost balance wo koryoshita denshi joho kyoyuka gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Shinohara, Y. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-04-01

    The key technology that can effectively support the sharing of each information such as documents, data, and know-how was rearranged to clarify how to utilize it for constructing an electronic information sharing system. The key technology that supports the sharing of electronic information was rearranged from the viewpoint of information gathering, information rearrangement, and information utilization. The reduction in cost for information gathering and rearrangement is indispensable to the promotion of much information sharing. However, each automation method presently causes the deterioration in quality of the rearranged information and the increase in cost for information utilization. To realize a practical electronic information sharing system, it is important to combine the key technologies properly so that the total cost balance of information gathering and information utilization is improved. Therefore, the combination of character recognition by OCR and unpreciseness retrieval, and the complementary combination of automatic document sorting, based on multiple incomplete rearrangement systems, and multiple sorting menus were proposed. 23 refs., 5 figs., 2 tabs.

  12. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  13. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  14. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  15. Cost escalation in nuclear power

    International Nuclear Information System (INIS)

    Montomery, W.D.; Quirk, J.P.

    1978-01-01

    This report is concerned with the escalation of capital costs of nuclear central station power plants between the early 1960s and the present. The report presents an historical overview of the development of the nuclear power industry and cost escalation in the industry, using existing data on orders and capital costs. New data are presented on regulatory delays in the licensing process, derived from a concurrent study being carried on in the Social Science group at Caltech. The conclusions of the study are that nuclear capital costs have escalated more rapidly than the GNP deflator or the construction industry price index. Prior to 1970, cost increases are related to bottleneck problems in the nuclear construction and supplying industries and the regulatory process; intervenors play only a minor role in cost escalation. After 1970, generic changes introduced into the licensing process by intervenors (including environmental impact reviews, antitrust reviews, more stringent safety standards) dominate the cost escalation picture, with bottlenecks of secondary importance. Recent increases in the time from application for a construction permit to commercial operation are related not only to intervenor actions, but also to suspensions, cancellations or postponements of construction by utilities due to unfavorable demand or financing conditions

  16. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  17. Enhanced Geothermal Systems (EGS) well construction technology evaluation report.

    Energy Technology Data Exchange (ETDEWEB)

    Capuano, Louis, Jr. (Thermasource Inc.); Huh, Michael; Swanson, Robert (Thermasource Inc.); Raymond, David Wayne; Finger, John Travis; Mansure, Arthur James; Polsky, Yarom; Knudsen, Steven Dell

    2008-12-01

    Electricity production from geothermal resources is currently based on the exploitation of hydrothermal reservoirs. Hydrothermal reservoirs possess three ingredients critical to present day commercial extraction of subsurface heat: high temperature, in-situ fluid and high permeability. Relative to the total subsurface heat resource available, hydrothermal resources are geographically and quantitatively limited. A 2006 DOE sponsored study led by MIT entitled 'The Future of Geothermal Energy' estimates the thermal resource underlying the United States at depths between 3 km and 10 km to be on the order of 14 million EJ. For comparison purposes, total U.S. energy consumption in 2005 was 100 EJ. The overwhelming majority of this resource is present in geological formations which lack either in-situ fluid, permeability or both. Economical extraction of the heat in non-hydrothermal situations is termed Enhanced or Engineered Geothermal Systems (EGS). The technologies and processes required for EGS are currently in a developmental stage. Accessing the vast thermal resource between 3 km and 10 km in particular requires a significant extension of current hydrothermal practice, where wells rarely reach 3 km in depth. This report provides an assessment of well construction technology for EGS with two primary objectives: (1) Determining the ability of existing technologies to develop EGS wells. (2) Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics. Towards these ends, a methodology is followed in which a case study is developed to systematically and quantitatively evaluate EGS well construction technology needs. A baseline EGS well specification is first formulated. The steps, tasks and tools involved in the construction of this prospective baseline EGS well are then explicitly defined by a geothermal drilling contractor in terms of sequence, time and

  18. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  19. Transportation and utilization of aggregates for road construction

    Science.gov (United States)

    Fladvad, Marit; Wigum, Børge Johannes; Aurstad, Joralf

    2017-04-01

    Road construction relies on non-renewable aggregate resources as the main construction material. Sources for high-quality aggregate resources are scattered, and requirements for aggregate quality can cause long transport distances between quarry and road construction site. In European countries, the average aggregate consumption per capita is 5 tonnes per year (European Aggregates Association, 2016), while the corresponding figure for Norway is 11 tonnes (Neeb, 2015). Half the Norwegian aggregate production (sand, gravel and crushed rock) is used for road construction. In Norway, aggregate resources have been considered abundant. However, stricter requirement for aggregate quality, and increased concern for sustainability and environmental issues have spurred focus on reduction of transport lengths through better utilization of local aggregate materials. In this research project, information about pavement design and aggregate quality requirements were gathered from a questionnaire sent to selected experts from the World Road Organization (PIARC), European Committee for Standardization (CEN), and Nordic Road Association (NVF). The gathered data was compared to identify differences and similarities for aggregate use in the participating countries. Further, the data was compared to known data from Norway regarding: - amount of aggregates required for a road structure - aggregate transport lengths and related costs A total of 18 countries participated in the survey, represented by either road authorities, research institutions, or contractors. There are large variations in practice for aggregate use among the represented countries, and the selection of countries is sufficient to illustrate a variety in pavement designs, aggregate sizes, and quality requirements for road construction. There are considerable differences in both pavement thickness and aggregate sizes used in the studied countries. Total thicknesses for pavement structures varies from 220 mm to 2400 mm

  20. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    DiNunzio, Camillo A. [Framatome ANP DE& S, Marlborough, MA (United States); Gupta, Abhinav [Univ. of North Carolina, Raleigh, NC (United States); Golay, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Luk, Vincent [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turk, Rich [Westinghouse Electric Company Nuclear Systems, Windsor, CT (United States); Morrow, Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jin, Geum-Taek [Korea Power Engineering Company Inc., Yongin-si, Gyeonggi-do (Korea, Republic of)

    2002-11-30

    This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  1. Perceptions Towards Non-Value-Adding Activities During The Construction Process

    Directory of Open Access Journals (Sweden)

    Ismail Haryati

    2016-01-01

    Full Text Available Non-value-adding activities are pure waste during the construction process. However, most of the construction practitioner does not realise that most of the activities performed during the construction process add no value to their project. A total of 375 numbers of questionnaires distributed to the Developer, Jabatan Kerja Raya, Consultants and Contractors. The study found that awareness by construction participants in Malaysia to take actions against non-value-adding activities during the construction process is relatively low. Through analysed by using the Pareto Chart, it has been found that defects and waiting time are two categories of non-value-adding activities that need to be prioritised by the industry. It is also found that non-value-adding activities most frequently occurred during structural and architectural work. This paper also reviewed on the causes of non-value-adding activities and discussed its effect towards time, cost, quality and productivity of the construction project. This paper is also important to give clearness and broader understandings on this form of waste other than material waste.

  2. Achievement report for fiscal 1981 on Sunshine Program-entrusted research and development. Research on hydrogen energy total system; 1981 nendo suiso energy total system no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    In this research, studies are conducted relative to the time point, form, and magnitude of the introduction of hydrogen into Japan's total energy system. The research aims to construct a hydrogen energy total system consisting of hydrogen energy subsystems to be available in the future and to clearly define the stage at which transfer to the target system will be carried out. In the research for fiscal 1981, studies continue about the feasibility of hydrogen as automobile and aviation fuels and as a material for use in chemical engineering, about conversion into each other of hydrogen and various synthetic fuels and electric power with which hydrogen will have to compete in the domain into which it will be supplied, and about technologies of their utilization for comparison between such energies in the search for their interchangeability. Surveys are conducted on technical data about local energies. The Yakushima island is chosen, for instance, and a conceptual hydrogen energy base is constructed there and the cost for the construction is estimated. At the last part, the feasibility of the introduction of hydrogen into Japan's energy system in the future is discussed for assessment. (NEDO)

  3. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  4. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  5. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    International Nuclear Information System (INIS)

    DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael; Luk, Vincent; Turk, Rich; Morrow, Charles; Geum-Taek Jin

    2002-01-01

    OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies

  6. Achievement report for fiscal 1982 on Sunshine Program-entrusted research and development. Research on hydrogen energy total system; 1982 nendo suiso energy total system no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    In this research on a hydrogen energy total system, studies are conducted on the plan of a hydrogen energy proving pilot base and on hydrogen as fuel for automobiles. It is estimated that the construction of a hydrogen energy proving pilot base will cost 7.125-billion yen in total. The sum includes 6.410-billion yen for the construction of a system on an island named Island A, 500-million yen for structures on an island named Island B, and 215-million yen for the construction of a marine transportation system between the two islands. Large shares will go to a hydroelectric power plant and a hydrogen liquefaction system, the two occupying approximately half of the total sum. In the study of hydrogen as fuel for automobiles, it is concluded that hydrogen is advantageously employed as fuel for automobiles. When comparison is made in terms of heat value, it is found that even a hydrogen engine which is a mere modification of a currently used engine is comparable to the currently used engine in terms of performance. As for abnormal combustion, a hydrogen/air 2-system injection method is contrived, and this solves the problem almost completely. Cryogenic hydrogen is advantageous in both NOx emission and heat efficiency though within certain limitations. From the viewpoint of safety, the recommended automobile fuel structural formula is GH{sub 2}(MH). (NEDO)

  7. Methodology of Evaluation of the Impact of Picking Area Location on the Total Costs of Warehouse

    Directory of Open Access Journals (Sweden)

    Apsalons Raitis

    2017-12-01

    Full Text Available The picking system and the layout of the picking area are the key drivers for the evaluation of a warehouse picking cost. There are five variants for organizing the picking process of orders in a warehouse. The choice of a specific variant depends on the total cost of picking. The picking cost is evaluated within an uninterrupted picking process. It means that no stock out occurs in the time period of the picking process. The storing area and the picking area are created as two separate zones for picking quantities of the customer’s orders; the principle of division of orders is observed strictly. Referring to the locations of stock keeping units (SKU, two approaches of the layout of SKU in the picking area can be estimated. The first one is the single picking location for each single SKU, where replenishment is realized in the picking process. The second one - various picking locations for each single SKU, and the replenishment here is realized just only prior to a picking process or after it. The main benefits of the economy of the picking cost as far as these two approaches are concerned are the shortest picking route in the first case and one common replenishment option in the second case.

  8. Benefits of using customized instrumentation in total knee arthroplasty: results from an activity-based costing model.

    Science.gov (United States)

    Tibesku, Carsten O; Hofer, Pamela; Portegies, Wesley; Ruys, C J M; Fennema, Peter

    2013-03-01

    The growing demand for total knee arthroplasty (TKA) associated with the efforts to contain healthcare expenditure by advanced economies necessitates the use of economically effective technologies in TKA. The present analysis based on activity-based costing (ABC) model was carried out to estimate the economic value of patient-matched instrumentation (PMI) compared to standard surgical instrumentation in TKA. The costs of the two approaches, PMI and standard instrumentation in TKA, were determined by the use of ABC which measures the cost of a particular procedure by determining the activities involved and adding the cost of each activity. Improvement in productivity due to increased operating room (OR) turn-around times was determined and potential additional revenue to the hospital by the efficient utilization of gained OR time was estimated. Increased efficiency in the usage of OR and utilization of surgical trays were noted with patient-specific approach. Potential revenues to the hospital were estimated with the use of PMI by efficient utilization of time saved in OR. Additional revenues of 78,240 per year were estimated considering utilization of gained OR time to perform surgeries other than TKA. The analysis suggests that use of PMI in TKA is economically effective when compared to standard instrumentation.

  9. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  10. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  11. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  12. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  13. 23 CFR 645.115 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 645.115 Section 645.115 Highways FEDERAL... Relocations, Adjustments, and Reimbursement § 645.115 Construction. (a) Part 635, subpart B, of this title, Force Account Construction (justification required for force account work), states that it is cost...

  14. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  15. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  16. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  17. Incidence, risk factors and the healthcare cost of falls postdischarge after elective total hip and total knee replacement surgery: protocol for a prospective observational cohort study

    Science.gov (United States)

    Hill, Anne-Marie; Ross-Adjie, Gail; McPhail, Steven M; Monterosso, Leanne; Bulsara, Max; Etherton-Beer, Christopher; Powell, Sarah-Jayne; Hardisty, Gerard

    2016-01-01

    Introduction The number of major joint replacement procedures continues to increase in Australia. The primary aim of this study is to determine the incidence of falls in the first 12 months after discharge from hospital in a cohort of older patients who undergo elective total hip or total knee replacement. Methods and analyses A prospective longitudinal observational cohort study starting in July 2015, enrolling patients aged ≥60 years who are admitted for elective major joint replacement (n=267 total hip replacement, n=267 total knee replacement) and are to be discharged to the community. Participants are followed up for 12 months after hospital discharge. The primary outcome measure is the rate of falls per thousand patient-days. Falls data will be collected by 2 methods: issuing a falls diary to each participant and telephoning participants monthly after discharge. Secondary outcomes include the rate of injurious falls and health-related quality of life. Patient-rated outcomes will be measured using the Oxford Hip or Oxford Knee score. Generalised linear mixed modelling will be used to examine the falls outcomes in the 12 months after discharge and to examine patient and clinical characteristics predictive of falls. An economic evaluation will be conducted to describe the nature of healthcare costs in the first 12 months after elective joint replacement and estimate costs directly attributable to fall events. Ethics and dissemination The results will be disseminated through local site networks and will inform future services to support older people undergoing hip or knee joint replacement and also through peer-reviewed publications and medical conferences. This study has been approved by The University of Notre Dame Australia and local hospital human research ethics committees. Trial registration number ACTRN12615000653561; Pre-results. PMID:27412102

  18. Economically and environmentally informed policy for road resurfacing: tradeoffs between costs and greenhouse gas emissions

    International Nuclear Information System (INIS)

    Reger, Darren; Madanat, Samer; Horvath, Arpad

    2014-01-01

    As road conditions worsen, users experience an increase in fuel consumption and vehicle wear and tear. This increases the costs incurred by the drivers, and also increases the amount of greenhouse gases (GHGs) that vehicles emit. Pavement condition can be improved through rehabilitation activities (resurfacing) to reduce the effects on users, but these activities also have significant cost and GHG emission impacts. The objective of pavement management is to minimize total societal (user and agency) costs. However, the environmental impacts associated with the cost-minimizing policy are not currently accounted for. We show that there exists a range of potentially optimal decisions, known as the Pareto frontier, in which it is not possible to decrease total emissions without increasing total costs and vice versa. This research explores these tradeoffs for a system of pavement segments. For a case study, a network was created from a subset of California’s highways using available traffic data. It was shown that the current resurfacing strategy used by the state’s transportation agency, Caltrans, does not fall on the Pareto frontier, meaning that significant savings in both total costs and total emissions can be achieved by switching to one of the optimal policies. The methods presented in this paper also allow the decision maker to evaluate the impact of other policies, such as reduced vehicle kilometers traveled or better construction standards. (letter)

  19. Economically and environmentally informed policy for road resurfacing: tradeoffs between costs and greenhouse gas emissions

    Science.gov (United States)

    Reger, Darren; Madanat, Samer; Horvath, Arpad

    2014-10-01

    As road conditions worsen, users experience an increase in fuel consumption and vehicle wear and tear. This increases the costs incurred by the drivers, and also increases the amount of greenhouse gases (GHGs) that vehicles emit. Pavement condition can be improved through rehabilitation activities (resurfacing) to reduce the effects on users, but these activities also have significant cost and GHG emission impacts. The objective of pavement management is to minimize total societal (user and agency) costs. However, the environmental impacts associated with the cost-minimizing policy are not currently accounted for. We show that there exists a range of potentially optimal decisions, known as the Pareto frontier, in which it is not possible to decrease total emissions without increasing total costs and vice versa. This research explores these tradeoffs for a system of pavement segments. For a case study, a network was created from a subset of California’s highways using available traffic data. It was shown that the current resurfacing strategy used by the state’s transportation agency, Caltrans, does not fall on the Pareto frontier, meaning that significant savings in both total costs and total emissions can be achieved by switching to one of the optimal policies. The methods presented in this paper also allow the decision maker to evaluate the impact of other policies, such as reduced vehicle kilometers traveled or better construction standards.

  20. Total variation regularization for a backward time-fractional diffusion problem

    International Nuclear Information System (INIS)

    Wang, Liyan; Liu, Jijun

    2013-01-01

    Consider a two-dimensional backward problem for a time-fractional diffusion process, which can be considered as image de-blurring where the blurring process is assumed to be slow diffusion. In order to avoid the over-smoothing effect for object image with edges and to construct a fast reconstruction scheme, the total variation regularizing term and the data residual error in the frequency domain are coupled to construct the cost functional. The well posedness of this optimization problem is studied. The minimizer is sought approximately using the iteration process for a series of optimization problems with Bregman distance as a penalty term. This iteration reconstruction scheme is essentially a new regularizing scheme with coupling parameter in the cost functional and the iteration stopping times as two regularizing parameters. We give the choice strategy for the regularizing parameters in terms of the noise level of measurement data, which yields the optimal error estimate on the iterative solution. The series optimization problems are solved by alternative iteration with explicit exact solution and therefore the amount of computation is much weakened. Numerical implementations are given to support our theoretical analysis on the convergence rate and to show the significant reconstruction improvements. (paper)

  1. Construction time of PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Carajilescov, Pedro; Moreira, Joao M.L., E-mail: pedro.carajilescov@ufabc.edu.b, E-mail: joao.moreira@ufabc.edu.b [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Center of Engineering, Modeling and Applied Social Sciences

    2011-07-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  2. Construction time of PWRs

    International Nuclear Information System (INIS)

    Carajilescov, Pedro; Moreira, Joao M.L.

    2011-01-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  3. Superconducting magnetic energy storage for electric utility load leveling: A study of cost vs. stored energy

    International Nuclear Information System (INIS)

    Luongo, C.A.; Loyd, R.J.

    1987-01-01

    Superconducting Magnetic Energy Storage (SMES) is a promising technology for electric utility load leveling. This paper presents the results of a study to establish the capital cost of SMES as a function of stored energy. Energy-related coil cost and total installed plant cost are given for construction in nominal soil and in competent rock. Economic comparisons are made between SMES and other storage technologies and peaking gas turbines. SMES is projected to be competitive at stored energies as low as 1000 MWh

  4. Total Joint Arthroplasty Patients' Education on Financial Issues and Its Connection to Reported Out-of-Pocket Costs-A European Study.

    Science.gov (United States)

    Copanitsanou, Panagiota; Valkeapää, Kirsi; Cabrera, Esther; Katajisto, Jouko; Leino-Kilpi, Helena; Sigurdardottir, Arun K; Unosson, Mitra; Zabalegui, Adelaida; Lemonidou, Chryssoula

    2017-04-01

    Total joint arthroplasty is accompanied by significant costs. In nursing, patient education on financial issues is considered important. Our purpose was to examine the possible association between the arthroplasty patients' financial knowledge and their out-of-pocket costs. Descriptive correlational study in five European countries. Patient data were collected preoperatively and at 6 months postoperatively, with structured, self-administered instruments, regarding their expected and received financial knowledge and out-of-pocket costs. There were 1,288 patients preoperatively, and 352 at 6 months. Patients' financial knowledge expectations were higher than knowledge received. Patients with high financial knowledge expectations and lack of fulfillment of these expectations had lowest costs. There is need to establish programs for improving the financial knowledge of patients. Patients with fulfilled expectations reported higher costs and may have followed and reported their costs in a more precise way. In the future, this association needs multimethod research. © 2016 Wiley Periodicals, Inc.

  5. Evaluation of the Influence of the Logistic Operations Reliability on the Total Costs of a Supply Chain

    Directory of Open Access Journals (Sweden)

    Lukinskiy Valery

    2016-12-01

    Full Text Available Nowadays in logistics integral processes between the material and related flows in supply chains are getting developed more and more. However, in spite of increasing volume of statistical data which reflect the integral processes, the influence evaluation issues of the logistic operations reliability indexes on the total logistics costs remain open and require the corresponding researches implementation.

  6. Incorporating a total cost perspective intothe purchasing strategy : A case study of amedium sized retail compan

    OpenAIRE

    EKSTRÖM, MARCUS; FAHNEHJELM, CAROLINA

    2016-01-01

    The retail industry is today characterized by downward price pressure, and the increasedcompetition in the industry has led to pressure on profit margins. Purchasing and supply chainmanagement have become areas of increased strategic importance and play a crucial role inthe business performance. This study aims to extend previous literature in these fields byproviding the existing research with an empirical study on how the purchasing strategy canincorporate a total cost perspective of the su...

  7. Blood Transfusion During Total Ankle Arthroplasty Is Associated With Increased In-Hospital Complications and Costs.

    Science.gov (United States)

    Ewing, Michael A; Huntley, Samuel R; Baker, Dustin K; Smith, Kenneth S; Hudson, Parke W; McGwin, Gerald; Ponce, Brent A; Johnson, Michael D

    2018-04-01

    Total ankle arthroplasty (TAA) is an increasingly used, effective treatment for end-stage ankle arthritis. Although numerous studies have associated blood transfusion with complications following hip and knee arthroplasty, its effects following TAA are largely unknown. This study uses data from a large, nationally representative database to estimate the association between blood transfusion and inpatient complications and hospital costs following TAA. Using the Nationwide Inpatient Sample (NIS) database from 2004 to 2014, 25 412 patients who underwent TAA were identified, with 286 (1.1%) receiving a blood transfusion. Univariate analysis assessed patient and hospital factors associated with blood transfusion following TAA. Patients requiring blood transfusion were more likely to be female, African American, Medicare recipients, and treated in nonteaching hospitals. Average length of stay for patients following transfusion was 3.0 days longer, while average inpatient cost was increased by approximately 50%. Patients who received blood transfusion were significantly more likely to suffer from congestive heart failure, peripheral vascular disease, hypothyroidism, coagulation disorder, or anemia. Acute renal failure was significantly more common among patients receiving blood transfusion ( P < .001). Blood transfusions following TAA are infrequent and are associated with multiple medical comorbidities, increased complications, longer hospital stays, and increased overall cost. Level III: Retrospective, comparative study.

  8. Noninvasive Hemoglobin Monitoring: A Rapid, Reliable, and Cost-Effective Method Following Total Joint Replacement.

    Science.gov (United States)

    Martin, J Ryan; Camp, Christopher L; Stitz, Amber; Young, Ernest Y; Abdel, Matthew P; Taunton, Michael J; Trousdale, Robert T

    2016-03-02

    Noninvasive hemoglobin (nHgb) monitoring was initially introduced in the intensive care setting as a means of rapidly assessing Hgb values without performing a blood draw. We conducted a prospective analysis to compare reliability, cost, and patient preference between nHgb monitoring and invasive Hgb (iHgb) monitoring performed via a traditional blood draw. We enrolled 100 consecutive patients undergoing primary or revision total hip or total knee arthroplasty. On postoperative day 1, nHgb and iHgb values were obtained within thirty minutes of one another. iHgb and nHgb values, cost, patient satisfaction, and the duration of time required to obtain each reading were recorded. The concordance correlation coefficient (CCC) was utilized to evaluate the agreement of the two Hgb measurement methods. Paired t tests and Wilcoxon signed-rank tests were utilized to compare mean Hgb values, time, and pain for all readings. The mean Hgb values did not differ significantly between the two measurement methods: the mean iHgb value (and standard deviation) was 11.3 ± 1.4 g/dL (range, 8.2 to 14.3 g/dL), and the mean nHgb value was 11.5 ± 1.8 g/dL (range, 7.0 to 16.0 g/dL) (p = 0.11). The CCC between the two Hgb methods was 0.69. One hundred percent of the patients with an nHgb value of ≥ 10.5 g/dL had an iHgb value of >8.0 g/dL. The mean time to obtain an Hgb value was 0.9 minute for the nHgb method and 51.1 minutes for the iHgb method (p measurement, resulting in a savings of $26 per Hgb assessment when the noninvasive method is used. Noninvasive Hgb monitoring was found to be more efficient, less expensive, and preferred by patients compared with iHgb monitoring. Providers could consider screening total joint arthroplasty patients with nHgb monitoring and only order iHgb measurement if the nHgb value is protocol had been applied to the first blood draw in our 100 patients, approximately $2000 would have been saved. Extrapolated to the U.S. total joint arthroplasty practice

  9. Learning through delivery, Westinghouse AP1000 plant construction

    International Nuclear Information System (INIS)

    Gorgemans, J.; Hinman, R.D.; Steuck, C.M.; Greco, P.L.

    2014-01-01

    The AP1000 plant, which is a 1100 MWe class pressurized water reactor with passive safety features, is designed around a conventional 2 loop, 2 steam generator primary system configuration with 2 hot legs, 4 reactor coolant pumps directly mounted in the steam generator lower head and 4 cold legs. A particular feature of AP1000 is its modular construction to minimize the time and cost of construction. Modular construction allows activities to be run in parallel, it allows more activities to be performed in a controlled factory instead of in the field, and it provides a better level of quality. The AP1000 plant design includes 106 structural modules and 52 mechanical modules. Structural modules include all penetrations for piping, cable trays, HVAC duct runs, and all reinforcement for pipe, equipment hangers, and supports. Structural modules are shipped in sub-modules to support transportation by rail or truck or barge. Mechanical modules contain equipment such as pumps, tanks, heat exchangers, air-handling units, and filters along with interconnecting pipes, valves, instruments, wiring and support services. Modular construction requires strong coordination between engineering, supply chain and construction. A total of 8 AP1000 units are currently under construction in China and in the United States. The lessons learned and best practices of each new AP1000 construction are systematically incorporated into the standard design. (A.C.)

  10. Research methods of the parameters of residential buildings construction

    Directory of Open Access Journals (Sweden)

    Grigor’ev Vladimir Aleksandrovich

    Full Text Available The analysis of construction theory and practice shows that rational organizational and technological parameters of the construction of residential buildings should be based on the manifestation in time and space of the most important stages construction with their harmonization. Basing on the experience of normalizing the construction duration, it is advisable to express the complex of residential buildings’ construction processes by their basic stages - preparatory period, underground part, aboveground part, external engineering networks and land improvement. The main indicators of the development and implementation of optimization solutions are: the total duration of the construction, the duration of the preparation period, the duration of the construction of the underground part, the duration of the construction of the aboveground part, the duration of external engineering networks laying, the duration of land improvement. The indicators of the total duration of the construction of residential buildings, the construction the underground and aboveground parts are determined on the basis of the operation of one assembly crane on an object of up to four sections. In case of more sections two (three cranes are considered and the total construction duration is set depending on these conditions. The duration of the construction of multisectional buildings is determined basing on the simultaneous construction of the stages or their combination with a certain time shift. However, this approach requires a significant amount of optimization solutions due to its multivariance. Therefore, in order to reduce the volume of calculations in some cases, for example, when planning the development of districts and neighborhoods, statistical methods can be used for determining the duration of the construction basing on the compilation of optimization solutions. The total duration of the construction and the duration of the main stages are multiple

  11. APPLICATION OF SIMPLIFIED TAXATION SYSTEM IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2011-01-01

    Full Text Available Specificity concerning cost formation of construction work executed by  entities of small business enterprises that use a simplified taxation system has a direct impact on the effectiveness of organization activity. Dozens of business entities applying various taxation systems are involved in the execution of the construction process. For this reason an inclusion of taxes in work cost may have a decisive influence on the selection of a contractor for an object construction.  

  12. DISPOSALSITE, Low-Level Radioactive Waste Storage Cost Analysis

    International Nuclear Information System (INIS)

    Smith, P.R.

    1990-01-01

    1 - Description of program or function: The Disposal Site Economic Model calculates the average generator price, or average price per cubic foot charged by a disposal facility to a waste generator, one measure of comparing the economic attractiveness of different waste disposal site and disposal technology combinations. The generator price is calculated to recover all costs necessary to develop, construct, operate, close, and care for a site through the end of the institutional care period and to provide the necessary financial returns to the site developer and lender (when used). Six alternative disposal technologies, based on either private or public financing, can be considered - shallow land disposal, intermediate depth disposal, above or below ground vaults, modular concrete canister disposal, and earth mounded concrete bunkers - based on either private or public development. 2 - Method of solution: The economic models incorporate default cost data from the Conceptual Design Report (DOE/LLW-60T, June 1987), a study by Rodgers Associated Engineering Corporation. Because all costs are in constant 1986 dollars, the figures must be modified to account for inflation. Interest during construction is either capitalized for the private developer or rolled into the loan for the public developer. All capital costs during construction are depreciated over the operating life of the site using straight-line depreciation for the private sector. 3 - Restrictions on the complexity of the problem - Maxima of: 100 years post-operating period, 30 years operating period, 15 years pre-operating period. The model should be used with caution outside the range of 1.8 to 10.5 million cubic feet of total volume. Depreciation is not recognized with public development

  13. A Cost-Effectiveness Analysis of Reverse Total Shoulder Arthroplasty versus Hemiarthroplasty for the Management of Complex Proximal Humeral Fractures in the Elderly.

    Science.gov (United States)

    Osterhoff, Georg; O'Hara, Nathan N; D'Cruz, Jennifer; Sprague, Sheila A; Bansback, Nick; Evaniew, Nathan; Slobogean, Gerard P

    2017-03-01

    There is ongoing debate regarding the optimal surgical treatment of complex proximal humeral fractures in elderly patients. To evaluate the cost-effectiveness of reverse total shoulder arthroplasty (RTSA) compared with hemiarthroplasty (HA) in the management of complex proximal humeral fractures, using a cost-utility analysis. On the basis of data from published literature, a cost-utility analysis was conducted using decision tree and Markov modeling. A single-payer perspective, with a willingness-to-pay (WTP) threshold of Can$50,000 (Canadian dollars), and a lifetime time horizon were used. The incremental cost-effectiveness ratio (ICER) was used as the study's primary outcome measure. In comparison with HA, the incremental cost per quality-adjusted life-year gained for RTSA was Can$13,679. One-way sensitivity analysis revealed the model to be sensitive to the RTSA implant cost and the RTSA procedural cost. The ICER of Can$13,679 is well below the WTP threshold of Can$50,000, and probabilistic sensitivity analysis demonstrated that 92.6% of model simulations favored RTSA. Our economic analysis found that RTSA for the treatment of complex proximal humeral fractures in the elderly is the preferred economic strategy when compared with HA. The ICER of RTSA is well below standard WTP thresholds, and its estimate of cost-effectiveness is similar to other highly successful orthopedic strategies such as total hip arthroplasty for the treatment of hip arthritis. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  14. The cost of engineered disposal facilities

    International Nuclear Information System (INIS)

    Mallory, C.W.; Razor, J.E.; Mills, D.

    1987-01-01

    An improved disposal trench was designed, constructed and placed into operation at the Maxey Flats Disposal Site during the period April 1985 through July 1986. With the improved trench design, the waste packages are placed in clusters and the surrounding space is filled with gravel and grouted with a sand/cement mixture to form walls and cells that surround the waste package. The walls provide structural support for a poly-ethylene reinforced soil beam which in turn supports a multi-layer protective cap. About 2,700 drums of waste (20,250 CF) were placed into the trench. The total cost of the improved trench was $193,500 and the unit cost was $9.56 per cubic foot not including the placement of the waste. The engineered features of the trench (i.e., sidewall infiltration barrier, grout backfill and the soil beam) cost $82,600 for a unit cost of $4.08 per cubic foot of waste. This is compared to the cost of concrete cannisters used for radioactive waste disposal. On a production basis the cannisters are estimated to cost about $1,260. Depending upon the type waste, the cost of the cannisters will range from $2 to $12 per cubic foot of waste. The slightly higher cost of the concrete cannisters is offset by certain performance advantages

  15. Marginal ambulatory teaching cost under varying levels of service utilization.

    Science.gov (United States)

    Panton, D M; Mushlin, A I; Gavett, J W

    1980-06-01

    The ambulatory component of residency training jointly produces two products, namely, training and patient services. In costing educational programs of this type, two approaches are frequently taken. The first considers the total costs of the educational program, including training and patient services. These costs are usually constructed from historical accounting records. The second approach attempts to cost the joint products separately, based upon estimates of future changes in program costs, if the product in question is added to or removed from the program. The second approach relates to typical decisions facing the managers of medical centers and practices used for teaching purposes. This article reports such a study of costs in a primary-care residency training program in a hospital outpatient setting. The costs of the product, i.e., on-the-job training, are evaluated using a replacement-cost concept under different levels of patient services. The results show that the cost of the product, training, is small at full clinical utilization and is sensitive to changes in the volume of services provided.

  16. Factors Affecting Time, Cost and Quality Management in Building ...

    African Journals Online (AJOL)

    The study is an assessment of time, cost and quality management in the Nigerian construction industry, and it aims to explore time cost and quality management in the construction industry. The objective of the study is to identify factors affecting time; cost and quality management in building construction projects. This study ...

  17. Cost Management Practices and Strategic Perspectives: a study in the construction industry of the State of Paraná

    OpenAIRE

    Almeida, Lauro Brito de; Machado, Esmael Almeida; Panhoca, Luiz

    2012-01-01

    The purpose of this paper is to investigate the cost management practices of building industry companies of Paraná that follow the typology of Porter´s strategies. The sample comprises member companies of the Association of Construction Industries of the State of Paraná (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis ...

  18. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  19. Construction of shipping channels in the Detroit River—History and environmental consequences

    Science.gov (United States)

    Bennion, David H.; Manny, Bruce A.

    2011-01-01

    The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.

  20. Cost analysis of neonatal and pediatric parenteral nutrition in Europe: a multi-country study.

    Science.gov (United States)

    Walter, E; Liu, F X; Maton, P; Storme, T; Perrinet, M; von Delft, O; Puntis, J; Hartigan, D; Dragosits, A; Sondhi, S

    2012-05-01

    Parenteral nutrition (PN) is critical in neonatal and pediatric care for patients unable to tolerate enteral feeding. This study assessed the total costs of compounding PN therapy for neonates, infants and children. Face-to-face and telephone interviews were conducted in 12 hospitals across four European countries (Belgium, France, Germany and UK) to collect information on resources utilized to compound PN, including nutrients, staff time, equipment cost and supplies. A bottom-up cost model was constructed to assess total costs of PN therapy by assigning monetary values to the resource utilization using published list prices and interview data. A total of 49,922 PN bags per year were used to treat 4295 neonatal and pediatric patients among these hospitals. The daily total costs of one compounded PN bag for neonates in the 12 hospitals across the four countries equalled euro 55.16 (Belgium euro 53.26, France euro 46.23, Germany euro 64.05, UK Ł 37.43/\\[euro]42.86). Overall, nutrients accounted for 25% of total costs, supplies 18%, wages 54% and equipment 3%. Average costs per bag for infants France, euro 92.70 in Germany and Ł 52.63/euro 60.26 in the UK), and for children 2-18 years euro 118.02 (euro 93.85 in Belgium, euro 121.35 in France, euro 124.54 in Germany and Ł 69.49/euro 79.56 in the UK), of which 63% is attributable to nutrients and 28% to wages. The data indicated that PN costs differ among countries and a major proportion was due to staff time (Ł 1=euro 1.144959).