WorldWideScience

Sample records for tests include power

  1. Economic/Environmental power dispatch for power systems including wind farms

    Directory of Open Access Journals (Sweden)

    Imen BEN JAOUED

    2015-05-01

    Full Text Available This paper presents the problem of the Economic/Environmental power Dispatching (EED of hybrid power system including wind energies. The power flow model for a stall regulated fixed speed wind generator (SR-FSWG system is discussed to assess the steady-state condition of power systems with wind farms. Modified Newton-Raphson algorithm including SR-FSWG is used to solve the load flow equations in which the state variables of the wind generators are combined with the nodal voltage magnitudes and angles of the entire network. The EED problem is a nonlinear constrained multi-objective optimization problem, two competing fuel cost and pollutant emission objectives should be minimized simultaneously while satisfying certain system constraints. In this paper, the resolution is done by the algorithm multi-objective particle swarm optimization (MOPSO. The effectiveness of the proposed method has been verified on IEEE 6-generator 30-bus test system and using MATLAB software package.

  2. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  3. WhalePower tubercle blade power performance test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    Toronto-based WhalePower Corporation has developed turbine blades that are modeled after humpback whale flippers. The blades, which incorporate tubercles along the leading edge of the blade, have been fitted to a Wenvor 25 kW turbine installed in North Cape, Prince Edward Island at a test site for the Wind Energy Institute of Canada (WEICan). A test was conducted to characterize the power performance of the prototype wind turbine. This report described the wind turbine configuration with particular reference to turbine information, power rating, blade information, tower information, control systems and grid connections. The test site was also described along with test equipment and measurement procedures. Information regarding power output as a function of wind speed was included along with power curves, power coefficient and annual energy production. The results for the power curve and annual energy production contain a level of uncertainty. While measurements for this test were collected and analyzed in accordance with International Electrotechnical Commission (IEC) standards for performance measurements of electricity producing wind turbines (IEC 61400-12-1), the comparative performance data between the prototype WhalePower wind turbine blade and the Wenvor standard blade was not gathered to IEC data standards. Deviations from IEC-61400-12-1 procedures were listed. 6 tabs., 16 figs., 3 appendices.

  4. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  5. HTS power lead testing at the Fermilab magnet test facility

    Energy Technology Data Exchange (ETDEWEB)

    Rabehl, R.; Carcagno, R.; Feher, S.; Huang, Y.; Orris, D.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.; /Fermilab

    2005-08-01

    The Fermilab Magnet Test Facility has tested high-temperature superconductor (HTS) power leads for cryogenic feed boxes to be placed at the Large Hadron Collider (LHC) interaction regions and at the new BTeV C0 interaction region of the Fermilab Tevatron. A new test facility was designed and operated, successfully testing 20 pairs of HTS power leads for the LHC and 2 pairs of HTS power leads for the BTeV experiment. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. Results from the facility commissioning are included, as is the performance of a new insulation method to prevent frost accumulation on the warm ends of the power leads.

  6. HTS power lead testing at the Fermilab magnet test facility

    International Nuclear Information System (INIS)

    Rabehl, R.; Carcagno, R.; Feher, S.; Huang, Y.; Orris, D.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.

    2005-01-01

    The Fermilab Magnet Test Facility has tested high-temperature superconductor (HTS) power leads for cryogenic feed boxes to be placed at the Large Hadron Collider (LHC) interaction regions and at the new BTeV CO interaction region of the Fermilab Tevatron. A new test facility was designed and operated, successfully testing 20 pairs of HTS power leads for the LHC and 2 pairs of HTS power leads for the BTeV experiment. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. Results from the facility commissioning are included, as is the performance of a new insulation method to prevent frost accumulation on the warm ends of the power leads

  7. Power Testing in Basketball: Current Practice and Future Recommendations.

    Science.gov (United States)

    Wen, Neal; Dalbo, Vincent J; Burgos, Bill; Pyne, David B; Scanlan, Aaron T

    2018-02-01

    Numerous foundational movements performed during basketball are predicated on underlying power-related attributes, including speed, change-of-direction, and jumping. Accordingly, fitness testing batteries for basketball have incorporated an assortment of linear speed tests, change-of-direction tests, and jump tests. However, due to the wide variety of testing options it is difficult for basketball practitioners to select appropriate testing protocols for the assessment of power-related attributes. As a result, there is a need to review the relevant literature to identify game-specific, power-related attributes important in basketball and the most appropriate tests available to assess power-related attributes for basketball practitioners. Therefore, the aims of this review were to: (1) identify essential power-related attributes important in basketball; (2) discuss the suitability of common and novel power-related tests; and (3) provide recommendations for future research and best practice approaches for basketball coaching staff. In this review, we propose a series of novel tests that are more targeted and specific to basketball movements including: (1) 5-m and 10-m linear sprints, (2) Modified Agility T-Test, (3) Change-of-Direction Deficit, (4) lateral bound, (5) Sargent jump, (6) one-step jump, and (7) isometric midthigh pull test. Improved testing of power-related attributes should enable basketball practitioners to develop targeted training plans for enhancing player performance.

  8. Production LHC HTS power lead test results

    CERN Document Server

    Tartaglia, M; Fehér, S; Huang, Y; Orris, D F; Pischalnikov, Y; Rabehl, Roger Jon; Sylvester, C D; Zbasnik, J

    2005-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under "standard" and "extreme" operating conditions, and the stability of performance across thermal cycles.

  9. Production LHC HTS power lead test results

    International Nuclear Information System (INIS)

    Tartaglia, M.A.; Carcagno, R.H.; Feher, S.; Huang, Y.; Orris, D.F.; Pischalnikov, Y.; Rabehl, R.J.; Sylvester, C.; Zbasnik, J.

    2004-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under ''standard'' and ''extreme'' operating conditions, and the stability of performance across thermal cycles

  10. Electric Power Monthly, August 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-29

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  11. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    International Nuclear Information System (INIS)

    Kotthoff, K.; Huren, H.

    1986-01-01

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  13. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    Energy Technology Data Exchange (ETDEWEB)

    Kotthoff, K. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany); Huren, H. [Rheinisch-Westfaelisches Elektrizitaetswerk AG, Betriebsverwaltung Biblis, Biblis (Germany)

    1986-02-15

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  14. Research reactors for power reactor fuel and materials testing - Studsvik's experience

    International Nuclear Information System (INIS)

    Grounes, M.

    1998-01-01

    Presently Studsvik's R2 test reactor is used for BWR and PWR fuel irradiations at constant power and under transient power conditions. Furthermore tests are performed with defective LWR fuel rods. Tests are also performed on different types of LWR cladding materials and structural materials including post-irradiation testing of materials irradiated at different temperatures and, in some cases, in different water chemistries and on fusion reactor materials. In the past, tests have also been performed on HTGR fuel and FBR fuel and materials under appropriate coolant, temperature and pressure conditions. Fuel tests under development include extremely fast power ramps simulating some reactivity initiated accidents and stored energy (enthalpy) measurements. Materials tests under development include different types of in-pile tests including tests in the INCA (In-Core Autoclave) facility .The present and future demands on the test reactor fuel in all these cases are discussed. (author)

  15. Electric power monthly, September 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  16. When the test of mediation is more powerful than the test of the total effect.

    Science.gov (United States)

    O'Rourke, Holly P; MacKinnon, David P

    2015-06-01

    Although previous research has studied power in mediation models, the extent to which the inclusion of a mediator will increase power has not been investigated. To address this deficit, in a first study we compared the analytical power values of the mediated effect and the total effect in a single-mediator model, to identify the situations in which the inclusion of one mediator increased statistical power. The results from this first study indicated that including a mediator increased statistical power in small samples with large coefficients and in large samples with small coefficients, and when coefficients were nonzero and equal across models. Next, we identified conditions under which power was greater for the test of the total mediated effect than for the test of the total effect in the parallel two-mediator model. These results indicated that including two mediators increased power in small samples with large coefficients and in large samples with small coefficients, the same pattern of results that had been found in the first study. Finally, we assessed the analytical power for a sequential (three-path) two-mediator model and compared the power to detect the three-path mediated effect to the power to detect both the test of the total effect and the test of the mediated effect for the single-mediator model. The results indicated that the three-path mediated effect had more power than the mediated effect from the single-mediator model and the test of the total effect. Practical implications of these results for researchers are then discussed.

  17. Brayton Power Conversion Unit Tested: Provides a Path to Future High-Power Electric Propulsion Missions

    Science.gov (United States)

    Mason, Lee S.

    2003-01-01

    Closed-Brayton-cycle conversion technology has been identified as an excellent candidate for nuclear electric propulsion (NEP) power conversion systems. Advantages include high efficiency, long life, and high power density for power levels from about 10 kWe to 1 MWe, and beyond. An additional benefit for Brayton is the potential for the alternator to deliver very high voltage as required by the electric thrusters, minimizing the mass and power losses associated with the power management and distribution (PMAD). To accelerate Brayton technology development for NEP, the NASA Glenn Research Center is developing a low-power NEP power systems testbed that utilizes an existing 2- kWe Brayton power conversion unit (PCU) from previous solar dynamic technology efforts. The PCU includes a turboalternator, a recuperator, and a gas cooler connected by gas ducts. The rotating assembly is supported by gas foil bearings and consists of a turbine, a compressor, a thrust rotor, and an alternator on a single shaft. The alternator produces alternating-current power that is rectified to 120-V direct-current power by the PMAD unit. The NEP power systems testbed will be utilized to conduct future investigations of operational control methods, high-voltage PMAD, electric thruster interactions, and advanced heat rejection techniques. The PCU was tested in Glenn s Vacuum Facility 6. The Brayton PCU was modified from its original solar dynamic configuration by the removal of the heat receiver and retrofitting of the electrical resistance gas heater to simulate the thermal input of a steady-state nuclear source. Then, the Brayton PCU was installed in the 3-m test port of Vacuum Facility 6, as shown. A series of tests were performed between June and August of 2002 that resulted in a total PCU operational time of about 24 hr. An initial test sequence on June 17 determined that the reconfigured unit was fully operational. Ensuing tests provided the operational data needed to characterize PCU

  18. Mechanical properties of JT-60 tokamak machine in power tests

    International Nuclear Information System (INIS)

    Takatsu, Hideyuki; Ohkubo, Minoru; Yamamoto, Masahiro; Ohta, Mitsuru

    1986-01-01

    JT-60 power tests were carried out from Dec. 10, 1984 to Feb. 20, 1985 to demonstrate, in advance of actual plasma operation, satisfactory performance of tokamak machine, power suppliers and control system in combination. The tests began with low power test of individual coil systems and progressed to full power tests. The coil current was raised step by step, monitoring the mechanical, thermal, electrical and vacuum data. Power tests were concluded with successful results. All of the coil systems were raised up to full power operation in combination and system performance was verified including the structural integrity of tokamak machine. Measured strain and deflection showed good agreements with those predicted in the design, which was an evidence that electromagnetic forces were supported as expected in the design. A few limitations to machine operation was made clear quantitatively. And it was found that existing detectors were insufficient to monitor machine integrity and two kinds of detector were proposed to be installed. (author)

  19. Progressive IRP Models for Power Resources Including EPP

    Directory of Open Access Journals (Sweden)

    Yiping Zhu

    2017-01-01

    Full Text Available In the view of optimizing regional power supply and demand, the paper makes effective planning scheduling of supply and demand side resources including energy efficiency power plant (EPP, to achieve the target of benefit, cost, and environmental constraints. In order to highlight the characteristics of different supply and demand resources in economic, environmental, and carbon constraints, three planning models with progressive constraints are constructed. Results of three models by the same example show that the best solutions to different models are different. The planning model including EPP has obvious advantages considering pollutant and carbon emission constraints, which confirms the advantages of low cost and emissions of EPP. The construction of progressive IRP models for power resources considering EPP has a certain reference value for guiding the planning and layout of EPP within other power resources and achieving cost and environmental objectives.

  20. Power Systems Development Facility Gasification Test Campaing TC18

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2005-08-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device (PCD), advanced syngas cleanup systems, and high pressure solids handling systems. This report details Test Campaign TC18 of the PSDF gasification process. Test campaign TC18 began on June 23, 2005, and ended on August 22, 2005, with the gasifier train accumulating 1,342 hours of operation using Powder River Basin (PRB) subbituminous coal. Some of the testing conducted included commissioning of a new recycle syngas compressor for gasifier aeration, evaluation of PCD filter elements and failsafes, testing of gas cleanup technologies, and further evaluation of solids handling equipment. At the conclusion of TC18, the PSDF gasification process had been operated for more than 7,750 hours.

  1. Testing power-law cross-correlations: Rescaled covariance test

    Czech Academy of Sciences Publication Activity Database

    Krištoufek, Ladislav

    2013-01-01

    Roč. 86, č. 10 (2013), 418-1-418-15 ISSN 1434-6028 R&D Projects: GA ČR GA402/09/0965 Institutional support: RVO:67985556 Keywords : power-law cross-correlations * testing * long-term memory Subject RIV: AH - Economics Impact factor: 1.463, year: 2013 http://library.utia.cas.cz/separaty/2013/E/kristoufek-testing power-law cross-correlations rescaled covariance test.pdf

  2. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  3. The Space Station Module Power Management and Distribution automation test bed

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

  4. Economic Dispatch for Power System Included Wind and Solar Thermal Energy

    Directory of Open Access Journals (Sweden)

    Saoussen BRINI

    2009-07-01

    Full Text Available With the fast development of technologies of alternative energy, the electric power network can be composed of several renewable energy resources. The energy resources have various characteristics in terms of operational costs and reliability. In this study, the problem is the Economic Environmental Dispatching (EED of hybrid power system including wind and solar thermal energies. Renewable energy resources depend on the data of the climate such as the wind speed for wind energy, solar radiation and the temperature for solar thermal energy. In this article it proposes a methodology to solve this problem. The resolution takes account of the fuel costs and reducing of the emissions of the polluting gases. The resolution is done by the Strength Pareto Evolutionary Algorithm (SPEA method and the simulations have been made on an IEEE network test (30 nodes, 8 machines and 41 lines.

  5. Best Practices: Power Quality and Integrated Testing at JSC

    Science.gov (United States)

    Davis, Lydia

    2018-01-01

    This presentation discusses Best Practices for Power Quality and Integrated Testing at JSC in regards to electrical systems. These high-level charts include mostly generic information; however, a specific issue is discussed involving flight hardware that could have been discovered prior to flight with an integrated test.

  6. Evaluation of the control system checkout test at 100% power for Yonggwang Nuclear Power Plant Unit 3

    International Nuclear Information System (INIS)

    Kim, Shin Whan; Lee, Joo Han; Baek, Jong Man; Seo, Jong Tae; Lee, Sang Keun; Kang, In Koo; Ju, Hee Wan; Min, Kyung Soo; Kim, Byung Gon

    1995-01-01

    Control system checkout tests at various powers for Yonggwang Nuclear Power Plant Unit 3(YGN3) were performed to demonstrate the accuracies and proper performances of the control systems of the plant. Tested control systems included the feedwater control system, steam bypass control system, reactor regulation system, control element drive mechanism control system, pressurizer level control system, and pressurizer pressure control system. The measured test data during the control system checkout test at 100% power are evaluated. The test results showed that the control systems of YGN 3 properly control system was simulated by using the LTC code which is the performance analysis code for YGN 3 and 4 design. Comparisons of the predicted results with the measured data confirmed that the feedwater control system controls the steam generator level as designed

  7. A High-power Electric Propulsion Test Platform in Space

    Science.gov (United States)

    Petro, Andrew J.; Reed, Brian; Chavers, D. Greg; Sarmiento, Charles; Cenci, Susanna; Lemmons, Neil

    2005-01-01

    This paper will describe the results of the preliminary phase of a NASA design study for a facility to test high-power electric propulsion systems in space. The results of this design study are intended to provide a firm foundation for subsequent detailed design and development activities leading to the deployment of a valuable space facility. The NASA Exploration Systems Mission Directorate is sponsoring this design project. A team from the NASA Johnson Space Center, Glenn Research Center, the Marshall Space Flight Center and the International Space Station Program Office is conducting the project. The test facility is intended for a broad range of users including government, industry and universities. International participation is encouraged. The objectives for human and robotic exploration of space can be accomplished affordably, safely and effectively with high-power electric propulsion systems. But, as thruster power levels rise to the hundreds of kilowatts and up to megawatts, their testing will pose stringent and expensive demands on existing Earth-based vacuum facilities. These considerations and the human access to near-Earth space provided by the International Space Station (ISS) have led to a renewed interest in space testing. The ISS could provide an excellent platform for a space-based test facility with the continuous vacuum conditions of the natural space environment and no chamber walls to modify the open boundary conditions of the propulsion system exhaust. The test platform could take advantage of the continuous vacuum conditions of the natural space environment. Space testing would provide open boundary conditions without walls, micro-gravity and a realistic thermal environment. Testing on the ISS would allow for direct observation of the test unit, exhaust plume and space-plasma interactions. When necessary, intervention by on-board personnel and post-test inspection would be possible. The ISS can provide electrical power, a location for

  8. Real time test bed development for power system operation, control and cyber security

    Science.gov (United States)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  9. Correlations between power and test reactor data bases

    International Nuclear Information System (INIS)

    Guthrie, G.L.; Simonen, E.P.

    1989-02-01

    Differences between power reactor and test reactor data bases have been evaluated. Charpy shift data has been assembled from specimens irradiated in both high-flux test reactors and low-flux power reactors. Preliminary tests for the existence of a bias between test and power reactor data bases indicate a possible bias between the weld data bases. The bias is nonconservative for power predictive purposes, using test reactor data. The lesser shift for test reactor data compared to power reactor data is interpreted primarily in terms of greater point defect recombination for test reactor fluxes compared to power reactor fluxes. The possibility of greater thermal aging effects during lower damage rates is also discussed. 15 refs., 5 figs., 2 tabs

  10. Rise-to-power test in High Temperature Engineering Test Reactor. Test progress and summary of test results up to 30 MW of reactor thermal power

    International Nuclear Information System (INIS)

    Nakagawa, Shigeaki; Fujimoto, Nozomu; Shimakawa, Satoshi

    2002-08-01

    The High Temperature Engineering Test Reactor (HTTR) is a graphite moderated and gas cooled reactor with the thermal power of 30 MW and the reactor outlet coolant temperature of 850degC/950degC. Rise-to-power test in the HTTR was performed from April 23rd to June 6th in 2000 as phase 1 test up to 10 MW in the rated operation mode, from January 29th to March 1st in 2001 as phase 2 test up to 20 MW in the rated operation mode and from April 14th to June 8th in 2001 as phase 3 test up to 20 MW in the high temperature test the mechanism of the reactor outlet coolant temperature becomes 850degC at 30 MW in the rated operation mode and 950degC in the high temperature test operation mode. Phase 4 rise-to-power test to achieve the thermal reactor power of 30 MW started on October 23rd in 2001. On December 7th in 2001 it was confirmed that the thermal reactor power and the reactor outlet coolant temperature reached to 30 MW and 850degC respectively in the single loaded operation mode in which only the primary pressurized water cooler is operating. Phase 4 test was performed until March 6th in 2002. JAERI (Japan Atomic Energy Research Institute) obtained the certificate of the pre-operation test from MEXT (Ministry of Education Culture Sports Science and Technology) after all the pre-operation tests by MEXT were passed successfully with the reactor transient test at an abnormal event as a final pre-operation test. From the test results of the rise-up-power test up to 30 MW in the rated operation mode, performance of the reactor and cooling system were confirmed, and it was also confirmed that an operation of reactor facility can be performed safely. Some problems to be solved were found through the tests. By solving them, the reactor operation with the reactor outlet coolant temperature of 950degC will be achievable. (author)

  11. Numerical and field tests of hydraulic transients at Piva power plant

    International Nuclear Information System (INIS)

    Giljen, Z

    2014-01-01

    In 2009, a sophisticated field investigation was undertaken and later, in 2011, numerical tests were completed, on all three turbine units at the Piva hydroelectric power plant. These tests were made in order to assist in making decisions about the necessary scope of the reconstruction and modernisation of the Piva hydroelectric power plant, a plant originally constructed in the mid-1970s. More specifically, the investigation included several hydraulic conditions including both the start-up and stopping of each unit, load rejection under governor control from different initial powers, as well as emergency shut-down. Numerical results were obtained using the method of characteristics in a representation that included the full flow system and the characteristics of each associated Francis turbine. The impact of load rejection and emergency shut-down on the penstock pressure and turbine speed changes are reported and numerical and experimental results are compared, showing close agreement

  12. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly

  13. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  14. High Power Alternator Test Unit (ATU) Electrical System Test

    Science.gov (United States)

    Birchenough, Arthur; Hervol, David

    2007-01-01

    The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was used to simulate the operating conditions and evaluate the performance of the ATU and it s interaction with various LPSF components in accordance with the JIMO AC Power System Requirements. The testing was carried out at the breadboard development level. Results of these tests will be used for the development and validation of analytical models for performance and lifetime prediction.

  15. Reliability of nondestructive testing of metal strength properties for power equipment

    International Nuclear Information System (INIS)

    Bugaj, N.V.; Lebedev, A.A.; Sharko, A.V.

    1985-01-01

    Ultrasonic control which is a constituent part of a complex control system which includes specimen-free (by hardness) tests, random breaking tests and acoustic measurements is stUdied for its reliability with respect to strength properties of power-equipment metal. Quantitative and alternative criteria are developed to estimate quality of elements for power-equipment according to results of metal strength properties. Acoustic control results are presented for ultimate strength in 12Kh1MF-steel

  16. Power-Cooling-Mismatch Test Series Test PCM-7. Experiment operating specifications

    International Nuclear Information System (INIS)

    Sparks, D.T.; Smith, R.H.; Stanley, C.J.

    1979-02-01

    The experiment operating specifications for the Power-Cooling-Mismatch (PCM) Test PCM-7 to be conducted in the Power Burst Facility are described. The PCM Test Series was designed on the basis of a parametric evaluation of fuel behavior response with cladding temperature, rod internal pressure, time in film boiling, and test rod power being the variable parameters. The test matrix, defined in the PCM Experiment Requirements Document (ERD), encompasses a wide range of situations extending from pre-CHF (critical heat flux) PCMs to long duration operation in stable film boiling leading to rod failure

  17. Advanced Grid Support Functionality Testing for Florida Power and Light

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Austin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Martin, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hurtt, James [Florida Power and Light, Juno Beach, FL (United States)

    2017-03-21

    This report describes the results of laboratory testing of advanced photovoltaic (PV) inverter testing undertaken by the National Renewable Energy Laboratory (NREL) on behalf of the Florida Power and Light Company (FPL). FPL recently commissioned a 1.1 MW-AC PV installation on a solar carport at the Daytona International Speedway in Daytona Beach, Florida. In addition to providing a source of clean energy production, the site serves as a live test bed with 36 different PV inverters from eight different manufacturers. Each inverter type has varied support for advanced grid support functions (GSFs) that are becoming increasingly commonplace, and are being required through revised interconnection standards such as UL1741, IEEE1547, and California (CA) Rule 21. FPL is interested in evaluating the trade-offs between different GSFs, their compliance to emerging standards, and their effects on efficiency and reliability. NREL has provided a controlled laboratory environment to undertake such a study. This work covered nine different classes of tests to compare inverter capabilities and performance for four different inverters that were selected by FPL. The test inverters were all three-phase models rated between 24-36 kW, and containing multiple PV input power point trackers. Advanced grid support functions were tested for functional behavior, and included fixed power factor operation, voltage-ride through, frequency ride-through, volt-var control, and frequency-Watt control. Response to abnormal grid conditions with GSFs enabled was studied through anti-islanding, fault, and load rejection overvoltage tests. Finally, efficiency was evaluated across a range of operating conditions that included power factor, output power, and input voltage variations. Test procedures were derived from requirements of a draft revision of UL741, CA Rule 21, and/or previous studies at NREL. This reports summarizes the results of each test case, providing a comparative performance analysis

  18. The potential for increased power from combining P-values testing the same hypothesis.

    Science.gov (United States)

    Ganju, Jitendra; Julie Ma, Guoguang

    2017-02-01

    The conventional approach to hypothesis testing for formal inference is to prespecify a single test statistic thought to be optimal. However, we usually have more than one test statistic in mind for testing the null hypothesis of no treatment effect but we do not know which one is the most powerful. Rather than relying on a single p-value, combining p-values from prespecified multiple test statistics can be used for inference. Combining functions include Fisher's combination test and the minimum p-value. Using randomization-based tests, the increase in power can be remarkable when compared with a single test and Simes's method. The versatility of the method is that it also applies when the number of covariates exceeds the number of observations. The increase in power is large enough to prefer combined p-values over a single p-value. The limitation is that the method does not provide an unbiased estimator of the treatment effect and does not apply to situations when the model includes treatment by covariate interaction.

  19. Automated System Tests High-Power MOSFET's

    Science.gov (United States)

    Huston, Steven W.; Wendt, Isabel O.

    1994-01-01

    Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.

  20. ACIGA's high optical power test facility

    International Nuclear Information System (INIS)

    Ju, L; Aoun, M; Barriga, P

    2004-01-01

    Advanced laser interferometer detectors utilizing more than 100 W of laser power and with ∼10 6 W circulating laser power present many technological problems. The Australian Consortium for Interferometric Gravitational Astronomy (ACIGA) is developing a high power research facility in Gingin, north of Perth, Western Australia, which will test techniques for the next generation interferometers. In particular it will test thermal lensing compensation and control strategies for optical cavities in which optical spring effects and parametric instabilities may present major difficulties

  1. Current developments in mechanized non-destructive testing in nuclear power plants

    International Nuclear Information System (INIS)

    Zeilinger, R.

    2008-01-01

    Nuclear power plants require frequent in-service activities to be carried out conscientiously in areas potentially hazardous to human operators (because of the associated radiation exposure), such as non-destructive testing of pressurized components of the steam system. Locations to be inspected in this way include the reactor pressure vessel, core internals, steam generators, pressurizers, and pipes. The codes to be used as a basis of these inspections demand high absolute positioning and repeating accuracy. These requirements can be met by mechanized test procedures. Accordingly, many new applications of, mostly mobile, robots have been developed over the past few years. The innovative control and sensor systems for stationary and mobile robots now on the market offer a potential for economic application in a large number of new areas in inspection, maintenance and service in nuclear power plants. More progress in this area is expected for the near future. Areva NP founded the new NDT Center, NETEC (Non-destructive Examination Technical Center), as a global technical center for non-destructive materials testing. NETEC is to advance research and development of all basic NDT technologies, robotics included. For many years, intelligeNDT has offered solutions and products for a variety of inspection and testing purposes and locations in nuclear power plants and is involved in continuous further development of the experience collected in nuclear power plants on the spot. (orig.)

  2. Small Radioisotope Power System Testing at NASA Glenn Research Center

    Science.gov (United States)

    Dugala, Gina; Bell, Mark; Oriti, Salvatore; Fraeman, Martin; Frankford, David; Duven, Dennis

    2013-01-01

    In April 2009, NASA Glenn Research Center (GRC) formed an integrated product team (IPT) to develop a Small Radioisotope Power System (SRPS) utilizing a single Advanced Stirling Convertor (ASC) with passive balancer. A single ASC produces approximately 80 We making this system advantageous for small distributed lunar science stations. The IPT consists of Sunpower, Inc., to provide the single ASC with a passive balancer, The Johns Hopkins University Applied Physics Laboratory (JHUAPL) to design an engineering model Single Convertor Controller (SCC) for an ASC with a passive balancer, and NASA GRC to provide technical support to these tasks and to develop a simulated lunar lander test stand. The single ASC with a passive balancer, simulated lunar lander test stand, and SCC were delivered to GRC and were tested as a system. The testing sequence at GRC included SCC fault tolerance, integration, electromagnetic interference (EMI), vibration, and extended operation testing. The SCC fault tolerance test characterized the SCCs ability to handle various fault conditions, including high or low bus power consumption, total open load or short circuit, and replacing a failed SCC card while the backup maintains control of the ASC. The integrated test characterized the behavior of the system across a range of operating conditions, including variations in cold-end temperature and piston amplitude, including the emitted vibration to both the sensors on the lunar lander and the lunar surface. The EMI test characterized the AC and DC magnetic and electric fields emitted by the SCC and single ASC. The vibration test confirms the SCCs ability to control the single ASC during launch. The extended operation test allows data to be collected over a period of thousands of hours to obtain long term performance data of the ASC with a passive balancer and the SCC. This paper will discuss the results of each of these tests.

  3. Hacking and penetration testing with low power devices

    CERN Document Server

    Polstra, Philip

    2014-01-01

    Hacking and Penetration Testing with Low Power Devices shows you how to perform penetration tests using small, low-powered devices that are easily hidden and may be battery-powered. It shows how to use an army of devices, costing less than you might spend on a laptop, from distances of a mile or more. Hacking and Penetration Testing with Low Power Devices shows how to use devices running a version of The Deck, a full-featured penetration testing and forensics Linux distribution, and can run for days or weeks on batteries due to their low power consumption. Author Philip Polstra shows how to

  4. X-band rf power production and deceleration in the two-beam test stand of the Compact Linear Collider test facility

    Directory of Open Access Journals (Sweden)

    E. Adli

    2011-08-01

    Full Text Available We discuss X-band rf power production and deceleration in the two-beam test stand of the CLIC test facility at CERN. The rf power is extracted from an electron drive beam by a specially designed power extraction structure. In order to test the structures at high-power levels, part of the generated power is recirculated to an input port, thus allowing for increased deceleration and power levels within the structure. The degree of recirculation is controlled by a splitter and phase shifter. We present a model that describes the system and validate it with measurements over a wide range of parameters. Moreover, by correlating rf power measurements with the energy lost by the electron beam, as measured in a spectrometer placed after the power extraction structure, we are able to identify system parameters, including the form factor of the electron beam. The quality of the agreement between model and reality gives us confidence to extrapolate the results found in the present test facility towards the parameter regime of CLIC.

  5. X-band rf power production and deceleration in the two-beam test stand of the Compact Linear Collider test facility

    CERN Document Server

    Adli, E; Dubrovskiy, A; Syratchev, I; Ruber, R; Ziemann, V

    2011-01-01

    We discuss X-band rf power production and deceleration in the two-beam test stand of the CLIC test facility at CERN. The rf power is extracted from an electron drive beam by a specially designed power extraction structure. In order to test the structures at high-power levels, part of the generated power is recirculated to an input port, thus allowing for increased deceleration and power levels within the structure. The degree of recirculation is controlled by a splitter and phase shifter. We present a model that describes the system and validate it with measurements over a wide range of parameters. Moreover, by correlating rf power measurements with the energy lost by the electron beam, as measured in a spectrometer placed after the power extraction structure, we are able to identify system parameters, including the form factor of the electron beam. The quality of the agreement between model and reality gives us confidence to extrapolate the results found in the present test facility towards the parameter reg...

  6. JT-60 power tests from mechanical and thermal viewpoints of tokamak machine

    International Nuclear Information System (INIS)

    Takatsu, H.; Yamamoto, M.; Ohkubo, M.

    1986-01-01

    JT-60 power tests were carried out, to demonstrate, in advance of actual plasma operation, satisfactory performance of the tokamak machine, power suppliers and control system in combination. The tests began with low power ones of individual coil systems, progressed to full power ones and concluded successfully. The present paper describes the principal results of JT-60 power tests from mechanical and thermal viewpoints of tokamak machine. All of the coil systems were raised up to full power operation in combination and system performance was verified including thermal and mechanical integrity of tokamak machine. Measured strain and displacement showed good agreements with those predicted in the design, which was an evidence that electromagnetic loads were supported adequately as expected in the design. Vibration of the vacuum vessel was found to be large up to 48 m/s/sup 2/ and caused excessive vibration of the lateral port gate-valves. A few limitations to machine operation were also made clear quantatively

  7. Grid Integration of PV Power based on PHIL testing using different Interface Algorithms

    DEFF Research Database (Denmark)

    Craciun, Bogdan-Ionut; Kerekes, Tamas; Sera, Dezso

    2013-01-01

    to be more active in grid support. Therefore, a better understanding and detailed analysis of the PV systems interaction with the grid is needed; hence power hardware in the loop (PHIL) testing involving PV power became an interesting subject to look into. To test PV systems for grid code (GC) compliance......Photovoltaic (PV) power among all renewable energies had the most accelerated growth rate in terms of installed capacity in recent years. Transmission System Operators (TSOs) changed their perspective about PV power and started to include it into their planning and operation, imposing PV systems...

  8. Optimal design of power system stabilizer for power systems including doubly fed induction generator wind turbines

    International Nuclear Information System (INIS)

    Derafshian, Mehdi; Amjady, Nima

    2015-01-01

    This paper presents an evolutionary algorithm-based approach for optimal design of power system stabilizer (PSS) for multi-machine power systems that include doubly fed induction generator wind turbines. The proposed evolutionary algorithm is an improved particle swarm optimization named chaotic particle swarm optimization with passive congregation (CPSO-PC) applied for finding the optimal settings of PSS parameters. Two different eigenvalue-based objectives are combined as the objective function for the optimization problem of tuning PSS parameters. The first objective function comprises the damping factor of lightly damped electro-mechanical modes and the second one includes the damping ratio of these modes. The effectiveness of the proposed method to design PSS for the power systems including DFIG (Doubly Fed Induction Generator) is extensively demonstrated through eigenvalue analysis and time-domain simulations and also by comparing its simulation results with the results of other heuristic optimization approaches. - Highlights: • A new optimization model for design of PSS in power systems including DFIG is proposed. • A detailed and realistic modeling of DFIG is presented. • A new evolutionary algorithm is suggested for solving the optimization problem of designing PSS

  9. A power recirculating test rig for ball screw endurance tests

    Directory of Open Access Journals (Sweden)

    Giberti Hermes

    2016-01-01

    Full Text Available A conceptual design of an innovative test rig for endurance tests of ball screws is presented in this paper. The test rig layout is based on the power recirculating principle and it also allows to overtake the main critical issues of the ball screw endurance tests. Among these there are the high power required to make the test, the lengthy duration of the same and the high loads between the screw and the frame that holds it. The article describes the test rig designed scheme, the kinematic expedients to be adopted in order to obtain the required performance and functionality and the sizing procedure to choose the actuation system.

  10. Optimized PWR power ascension reload testing

    International Nuclear Information System (INIS)

    Emery, S.P.; Long, S.W.; Nazareth, V.F.; Herschthal, M.A.

    1987-01-01

    Reduction in critical path testing time following refueling is actively supported by utilities to increase plant capacity factor and to minimize replacement power costs. Combustion Engineering (C-E) has developed a fast power ascension program (FPAP), which reduces this critical path testing by minimizing holds at intermediate power levels and by automating data acquisition and analysis. A very successful demonstration of the FPAP was performed recently during the cycle 3 startup of Southern California Edison's San Onofre Unit 2 reactor, which resulted in a critical path time savings of ∼ 3 days

  11. The current state of inservice testing programs at U.S. Nuclear Power Plants - a regulatory overview

    International Nuclear Information System (INIS)

    Campbell, P.; Colaccino, J.

    1994-01-01

    Information is provided on inservice testing (IST) of pumps and valves at U.S. nuclear power plants to provide consistency in the implementation of regulatory requirements and to enhance communications among utility licensees who may have, like NSSS vendors, similar kinds and numbers of components or comparable IST programs. Documents discussed include the ASME Operation and Maintenance Standards Parts 6 and 10 (covering inservice testing of pumps and valves in light water reactor power plants), the draft NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants (including review comments by Nuclear Management and Resource Council), and applicable Licensee Event Reports including summaries of several reports relating to IST

  12. Advanced power cycling test for power module with on-line on-state VCE measurement

    DEFF Research Database (Denmark)

    Choi, Ui-min; Trintis, Ionut; Blaabjerg, Frede

    2015-01-01

    module. The proposed concept can perform various stress conditions which is valid in a real mission profile and it is using a real power converter application with small loss. The concept of the proposed test setup is first presented. Then, the on-line on-state collector-emitter voltage VCE measurement......Recent research has made an effort to improve the reliability of power electronic systems to comply with more stringent constraints on cost, safety, predicted lifetime and availability in many applications. For this, studies about failure mechanisms of power electronic components and lifetime...... estimation of power semiconductor devices and capacitors have been done. Accelerated power cycling test is one of the common tests to assess the power device module and develop the lifetime model considering the physics of failure. In this paper, a new advanced power cycling test setup is proposed for power...

  13. Performance test of uninterruptible power system of PIEF

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jong Chae; Kim, Eun Ka; Chun, Yong Bum; Park, Dea Gyu; Chu, Yong Sun; Bae, Sang Min; Koo, Dae Seo

    1998-02-01

    Because of the special features of post-irradiation examination (PIE) facility to handle very high radioactive materials like spent nuclear fuels, the electric system of the facility was designed and constructed according to a very strict requirement which is applied to nuclear power plant. A safety grade of Class 1E was adopted in the power utility system of PIEF to guarantee stable power supply to the facility without any expected interruption. In order cope with a emergency condition like a power interruption of KEPCO, a emergency power supplying system consisting of a diesel generator (3-phase, 6600/440, 1,000 kW) and uninterruptibel power supply (UPS) system was installed in PIEF. UPS power is connected to the radiation monitoring system and several other main safety devices to assure of normal operations of them for not less than 30 minutes. According to the recommendations and regulations in nuclear law, a monthly and yearly regular inspection for the UPS and emergency power supplying system are performed. In this report, a brief description to establish self-inspection technology and procedures for the above mentioned electric power supplying system at PIEF, including a principle of operation, inspection scheme, trouble shooting, and performance test techniques were made. (author). 8 refs., 3 tabs., 4 figs.

  14. Free-piston Stirling component test power converter

    Science.gov (United States)

    Dochat, George; Dhar, Manmohan

    1991-01-01

    The National Aeronautics and Space Administration (NASA) has been evaluating free-piston Stirling power converters (FPSPCs) for use on a wide variety of space missions. They provide high reliability, long life, and efficient operation and can be coupled with all potential heat sources, various heat input and heat rejection systems, and various power management and distribution systems. FPSPCs can compete favorably with alternative power conversion systems over a range of hundreds of watts to megawatts. Mechanical Technology Incorporated (MTI) is developing FPSPC technology under contract to NASA Lewis Research Center and will demonstrate this technology in two full-scale power converters operating at space temperature conditions. The testing of the first of these, the component test power converter (CTPC), was initiated in Spring 1991 to evaluate mechanical operation at space operating temperatures. The CTPC design, hardware fabrication, and initial test results are reviewed.

  15. Including investment risk in large-scale power market models

    DEFF Research Database (Denmark)

    Lemming, Jørgen Kjærgaard; Meibom, P.

    2003-01-01

    Long-term energy market models can be used to examine investments in production technologies, however, with market liberalisation it is crucial that such models include investment risks and investor behaviour. This paper analyses how the effect of investment risk on production technology selection...... can be included in large-scale partial equilibrium models of the power market. The analyses are divided into a part about risk measures appropriate for power market investors and a more technical part about the combination of a risk-adjustment model and a partial-equilibrium model. To illustrate...... the analyses quantitatively, a framework based on an iterative interaction between the equilibrium model and a separate risk-adjustment module was constructed. To illustrate the features of the proposed modelling approach we examined how uncertainty in demand and variable costs affects the optimal choice...

  16. Start-up test of Fukushima Daini Nuclear Power Station Unit No.3

    International Nuclear Information System (INIS)

    Inomata, Toshio; Umezu, Akira; Kajikawa, Makoto; Koibuchi, Hiroshi; Netsu, Nobuhiko.

    1986-01-01

    In Unit 3 of the Fukushima Nuclear Power Station II (daini), a BWR power plant of output 1,100 MW, commercial operation was started in June 1985. Its start-up test was finished successfully in about nine months. That is, new equipments introduced were demonstration tested. Though the items of testing are increased, the start-up test took short time, resulting in construction period only 54.7 months of the Unit 3, the shortest in the world. During the test, there was no scramming other than the planned. Described are the following: an outline of the Unit 3, the items of its improvement and standardization, including the new equipments, preparations for the start-up test, the start-up test and its evaluation. (Mori, K.)

  17. Advanced Accelerated Power Cycling Test for Reliability Investigation of Power Device Modules

    DEFF Research Database (Denmark)

    Choi, Uimin; Jørgensen, Søren; Blaabjerg, Frede

    2016-01-01

    This paper presents an apparatus and methodology for an advanced accelerated power cycling test of insulated-gate bipolar transistor (IGBT) modules. In this test, the accelerated power cycling test can be performed under more realistic electrical operating conditions with online wear-out monitoring...... of tested power IGBT module. The various realistic electrical operating conditions close to real three-phase converter applications can be achieved by the simple control method. Further, by the proposed concept of applying the temperature stress, it is possible to apply various magnitudes of temperature...... swing in a short cycle period and to change the temperature cycle period easily. Thanks to a short temperature cycle period, test results can be obtained in a reasonable test time. A detailed explanation of apparatus such as configuration and control methods for the different functions of accelerated...

  18. New facility for testing LHC HTS power leads

    CERN Document Server

    Rabehl, Roger Jon; Fehér, S; Huang, Y; Orris, D; Pischalnikov, Y; Sylvester, C D; Tartaglia, M

    2005-01-01

    A new facility for testing HTS power leads at the Fermilab Magnet Test Facility has been designed and operated. The facility has successfully tested 19 pairs of HTS power leads, which are to be integrated into the Large Hadron Collider Interaction Region cryogenic feed boxes. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. HTS power lead test results from the commissioning phase of the project are also presented.

  19. High power rf component testing for the NLC

    International Nuclear Information System (INIS)

    Vlieks, A.E.; Fowkes, W.R.; Loewen, R.J.; Tantawi, S.G.

    1998-09-01

    In the Next Linear Collider (NLC), the high power rf components must be capable of handling peak rf power levels in excess of 600 MW. In the current view of the NLC, even the rectangular waveguide components must transmit at least 300 MW rf power. At this power level, peak rf fields can greatly exceed 100 MV/m. The authors present recent results of high power tests performed at the Accelerator Structure Test Area (ASTA) at SLAC. These tests are designed to investigate the rf breakdown limits of several new components potentially useful for the NLC. In particular, the authors tested a new TE 01 --TE 10 circular to rectangular wrap-around mode converter, a modified (internal fin) Magic Tee hybrid, and an upgraded flower petal mode converter

  20. Special Tests for the Power Electronic Converters of Wind Turbine Generators

    DEFF Research Database (Denmark)

    Helle, Lars; Senturk, Osman Selcuk; Teodorescu, Remus

    2011-01-01

    -level medium-voltage source converter topologies, of the 3L-ANPC-VSC and 3L-HB-VSC type, are considered in the paper. Both converters employ press-pack IGBT-diode pairs and interface a 6 MW wind turbine to a medium voltage grid. The power loss and thermal model data applicable for both grid and generator......Power electronic converters for wind turbines are characterized by high specific power density and high reliability. Special tests for such converters are performed in order to determine the power loss and thermal models, which are dependent of the load profile and converter structure. Two multi......-side VSCs is used to estimate the switch junction temperatures through the simulation of wind turbine grid interface operation. A discussion of the power density and reliability of the grid-side VSCs with respect to press-pack switches, gate driver, and cooling plate is included. A test set-up for a single...

  1. Design of a high-power test model of the PEP-II rf cavity

    International Nuclear Information System (INIS)

    Schwarz, H.D.; Bell, R.A.; Hodgson, J.A.

    1993-05-01

    The design of a normal-conducting high-power test cavity (HPTC) for PEP-II is described. The cavity includes HOM loading waveguides and provisions for testing two alternate input coupling schemes. 3-D electromagnetic field simulations provided input information for the surface power deposition. Finite element codes were utilized for thermal and stress analyses of the cavity to arrive at a suitable mechanical design capable of handling the high power dissipation. The mechanical design approach with emphasis on the cooling channel layout and mechanical stress reduction is described

  2. Construction and Testing of a 21 GHz Ceramic Based Power Extractor

    CERN Document Server

    Newsham, D; Carron, G; Döbert, Steffen; Gai, W; Konecny, R; Liu, W; Smirnov, A Yu; Thorndahl, L; Wilson, Ian H; Wuensch, Walter; Yu, D

    2003-01-01

    A ceramic based power extractor [1] operating at 21 GHz was built by DULY Research Inc. and tested at CTF2, the CERN Linear Collider (CLIC) Test Facility. The structure includes a ceramic extractor section, a 2-output-port, circular-to-rectangular waveguide coupler, and a 3-port rectangular waveguide combiner that provides for a single output waveguide. Results of cold tests and full beam tests are presented and compared with theoretical and numerical models.

  3. Mechanical and thermal characteristics of JT-60 tokamak machine demonstrated in its power tests

    International Nuclear Information System (INIS)

    Takatsu, Hideyuki; Yamamoto, Masahiro; Ohkubo, Minoru

    1985-09-01

    JT-60 power tests were carried out from Dec. 10, 1984 to Feb. 20, 1985 to demonstrate, in advance of actual plasma operation, satisfactory performance of tokamak machine, power suppliers and control system in combination. The tests began with low power test of individual coil systems and progressed to full power tests. Power tests were successfully concluded with the following conclusions. (1) All of the coil systems were raised up to full power operation in combination and system performance was verified including thermal and structural integrity of tokamak machine. (2) Measured strain and deflection showed good agreements with those predicted in the design, which was an evidence that electromagnetic loads were supported adequately as expected in the design. (3) Vibration of lateral port was found to be large up to 50 m/s 2 and caused excessive vibration of gate-valves. (4) A few limitations to machine operation were made clear quantatively. (5) It was found that the existing detectors were insufficient to monitor the machine integrity and a few kinds of detectors were necessary to be installed. (author)

  4. Test setup for accelerated test of high power IGBT modules with online monitoring of Vce and Vf voltage during converter operation

    DEFF Research Database (Denmark)

    de Vega, Angel Ruiz; Ghimire, Pramod; Pedersen, Kristian Bonderup

    2014-01-01

    Several accelerated test methods exist in order to study the failures mechanisms of the high power IGBT modules like temperature cycling test or power cycles based on DC current pulses. The main drawback is that the test conditions do not represent the real performance and stress conditions...... of the device in real application. The hypothesis is that ageing of power modules closer to real environment including cooling system, full dc-link voltage and continuous PWM operation could lead to more accurate study of failure mechanism. A new type of test setup is proposed, which can create different real...... load conditions like in the field. Furthermore, collector-emitter voltage (Vce) has been used as indicator of the wear-out of the high power IGBT module. The innovative monitoring system implemented in the test setup is capable of measure the Vce and forward voltage of the antiparallel diode (Vf...

  5. Testing power system controllers by real-time simulation

    DEFF Research Database (Denmark)

    Venne, Philippe; Guillaud, Xavier; Sirois, Frédéric

    2007-01-01

    In this paper, we present a number of state-of-the art methods for testing power system controllers based on the use of a real-time power system simulator. After introducing Hypersim, we list and discuss the different means of connection between the controller under tests and the power system...

  6. A Study on Test Technology to Diagnose the Power Apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Kim, K H; Kang, Y S; Jeon, Y K; Lee, W Y; Kang, D S; Kyu, H S; Sun, J H; Jo, K H [Korea Electrotechnology Research Institute (Korea, Republic of); Jung, J S; Mun, Y T; Lee, K H; Jung, E H; Kim, J H [Korea Water Resources Corporation (Korea, Republic of)

    1997-02-01

    In this study, we have educated KOWACO(Korea Water Resources Corporation) specialists about the insulation diagnostic technology and trained them the insulation diagnostic test and estimation method of power apparatus. The main results of this study are as follows; A. Education of basic high-voltage engineering. B. Research of insulation characteristic and deterioration mechanism in power apparatus C. Discussion on high-voltage test standard specifications. D. Study on insulation deterioration diagnostics in power apparatus. E. Field testing of insulation diagnosis in power apparatus. F. Engineering of insulation diagnostic testing apparatus to diagnose power apparatus. KOWACO specialists are able to diagnose insulation diagnostic test of power apparatus through this study. As they have instruments to diagnose power apparatus, they can do the test and estimation of the power apparatus insulation diagnosis. (author). refs., figs., tabs.

  7. Free-piston Stirling component test power converter test results and potential Stirling applications

    Science.gov (United States)

    Dochat, G. R.

    1992-01-01

    As the principal contractor to NASA-Lewis Research Center, Mechanical Technology Incorporated is under contract to develop free-piston Stirling power converters in the context of the competitive multiyear Space Stirling Technology Program. The first generation Stirling power converter, the component test power converter (CTPC) initiated cold end testing in 1991, with hot testing scheduled for summer of 1992. This paper reviews the test progress of the CTPC and discusses the potential of Stirling technology for various potential missions at given point designs of 250 watts, 2500 watts, and 25,000 watts.

  8. Power Systems Development Facility Gasification Test Campaign TC24

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-03-30

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC24, the first test campaign using a bituminous coal as the feedstock in the modified Transport Gasifier configuration. TC24 was conducted from February 16, 2008, through March 19, 2008. The PSDF gasification process operated for about 230 hours in air-blown gasification mode with about 225 tons of Utah bituminous coal feed. Operational challenges in gasifier operation were related to particle agglomeration, a large percentage of oversize coal particles, low overall gasifier solids collection efficiency, and refractory degradation in the gasifier solids collection unit. The carbon conversion and syngas heating values varied widely, with low values obtained during periods of low gasifier operating temperature. Despite the operating difficulties, several periods of steady state operation were achieved, which provided useful data for future testing. TC24 operation afforded the opportunity for testing of various types of technologies, including dry coal feeding with a developmental feeder, the Pressure Decoupled Advanced Coal (PDAC) feeder; evaluating a new hot gas filter element media configuration; and enhancing syngas cleanup with water-gas shift catalysts. During TC24, the PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane.

  9. Estimation of sample size and testing power (part 5).

    Science.gov (United States)

    Hu, Liang-ping; Bao, Xiao-lei; Guan, Xue; Zhou, Shi-guo

    2012-02-01

    Estimation of sample size and testing power is an important component of research design. This article introduced methods for sample size and testing power estimation of difference test for quantitative and qualitative data with the single-group design, the paired design or the crossover design. To be specific, this article introduced formulas for sample size and testing power estimation of difference test for quantitative and qualitative data with the above three designs, the realization based on the formulas and the POWER procedure of SAS software and elaborated it with examples, which will benefit researchers for implementing the repetition principle.

  10. High Power RF Test Facility at the SNS

    CERN Document Server

    Kang, Yoon W; Campisi, Isidoro E; Champion, Mark; Crofford, Mark; Davis, Kirk; Drury, Michael A; Fuja, Ray E; Gurd, Pamela; Kasemir, Kay-Uwe; McCarthy, Michael P; Powers, Tom; Shajedul Hasan, S M; Stirbet, Mircea; Stout, Daniel; Tang, Johnny Y; Vassioutchenko, Alexandre V; Wezensky, Mark

    2005-01-01

    RF Test Facility has been completed in the SNS project at ORNL to support test and conditioning operation of RF subsystems and components. The system consists of two transmitters for two klystrons powered by a common high voltage pulsed converter modulator that can provide power to two independent RF systems. The waveguides are configured with WR2100 and WR1150 sizes for presently used frequencies: 402.5 MHz and 805 MHz. Both 402.5 MHz and 805 MHz systems have circulator protected klystrons that can be powered by the modulator capable of delivering 11 MW peak and 1 MW average power. The facility has been equipped with computer control for various RF processing and complete dual frequency operation. More than forty 805 MHz fundamental power couplers for the SNS superconducting linac (SCL) cavitites have been RF conditioned in this facility. The facility provides more than 1000 ft2 floor area for various test setups. The facility also has a shielded cave area that can support high power tests of normal conducti...

  11. SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST

    International Nuclear Information System (INIS)

    MI, J.L.; SANDBERG, J.; SANDERS, R.; SOUKAS, A.; ZHANG, W.

    2000-01-01

    The SNS (Spallation Neutron Source) accumulator ring Extraction System consists of a Fast kicker and a Lambertson Septum magnet. The proposed design will use 14 kicker magnets powered by an Extraction Kicker Power Supply System. They will eject the high power beam from the SNS accumulator ring into RTBT (Ring to Target Beam Tunnel) through a Lambertson Septum magnet. This paper describes some test results of the SNS Extraction Kicker power supply prototype. The high repetition rate of 60 pulse per second operation is the challenging part of the design. In the prototype testing, a 3 kA damp current of 700ns pulse-width, 200 nS rise time and 60 Hz repetition rate at 32 kV PFN operation voltage has been demonstrated. An Extraction kicker power supply system design diagram is depicted

  12. Power Systems Development Facility Gasification Test Campaign TC25

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-12-01

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC25, the second test campaign using a high moisture lignite coal from the Red Hills mine in Mississippi as the feedstock in the modified Transport Gasifier configuration. TC25 was conducted from July 4, 2008, through August 12, 2008. During TC25, the PSDF gasification process operated for 742 hours in air-blown gasification mode. Operation with the Mississippi lignite was significantly improved in TC25 compared to the previous test (TC22) with this fuel due to the addition of a fluid bed coal dryer. The new dryer was installed to dry coals with very high moisture contents for reliable coal feeding. The TC25 test campaign demonstrated steady operation with high carbon conversion and optimized performance of the coal handling and gasifier systems. Operation during TC25 provided the opportunity for further testing of instrumentation enhancements, hot gas filter materials, and advanced syngas cleanup technologies. The PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane with syngas from the Transport Gasifier.

  13. Improving Size and Power in Unit Root Testing

    DEFF Research Database (Denmark)

    Haldrup, Niels; Jansson, Michael

    A frequent criticism of unit root tests concerns the poor power and size properties that many of such testsexhibit. However, the past decade or so intensive research has been conducted to alleviate these problems and great advances have been made. The present paper provides a selective survey...... of recent contributions to improve upon both size and power of unit root tests and in so doing the approach of using rigorous statistical optimality criteria in the development of such tests is stressed. In addition to presenting tests where improved size can be achieved by modifying the standard Dickey......-Fuller class of tests, the paper presents theory of optimal testing and the construction of power envelopes for unit root tests underdifferent conditions allowing for serial correlation, deterministic components, assumptions regarding the initial condition, non-Gaussian errors, and the use of covariates....

  14. A shift from significance test to hypothesis test through power analysis in medical research.

    Science.gov (United States)

    Singh, G

    2006-01-01

    Medical research literature until recently, exhibited substantial dominance of the Fisher's significance test approach of statistical inference concentrating more on probability of type I error over Neyman-Pearson's hypothesis test considering both probability of type I and II error. Fisher's approach dichotomises results into significant or not significant results with a P value. The Neyman-Pearson's approach talks of acceptance or rejection of null hypothesis. Based on the same theory these two approaches deal with same objective and conclude in their own way. The advancement in computing techniques and availability of statistical software have resulted in increasing application of power calculations in medical research and thereby reporting the result of significance tests in the light of power of the test also. Significance test approach, when it incorporates power analysis contains the essence of hypothesis test approach. It may be safely argued that rising application of power analysis in medical research may have initiated a shift from Fisher's significance test to Neyman-Pearson's hypothesis test procedure.

  15. Closed Cycle Engine Program Used in Solar Dynamic Power Testing Effort

    Science.gov (United States)

    Ensworth, Clint B., III; McKissock, David B.

    1998-01-01

    NASA Lewis Research Center is testing the world's first integrated solar dynamic power system in a simulated space environment. This system converts solar thermal energy into electrical energy by using a closed-cycle gas turbine and alternator. A NASA-developed analysis code called the Closed Cycle Engine Program (CCEP) has been used for both pretest predictions and post-test analysis of system performance. The solar dynamic power system has a reflective concentrator that focuses solar thermal energy into a cavity receiver. The receiver is a heat exchanger that transfers the thermal power to a working fluid, an inert gas mixture of helium and xenon. The receiver also uses a phase-change material to store the thermal energy so that the system can continue producing power when there is no solar input power, such as when an Earth-orbiting satellite is in eclipse. The system uses a recuperated closed Brayton cycle to convert thermal power to mechanical power. Heated gas from the receiver expands through a turbine that turns an alternator and a compressor. The system also includes a gas cooler and a radiator, which reject waste cycle heat, and a recuperator, a gas-to-gas heat exchanger that improves cycle efficiency by recovering thermal energy.

  16. Prototype tests on the ion source power supplies of the TEXTOR NI-system

    International Nuclear Information System (INIS)

    Goll, O.; Braunsberger, U.; Schwarz, U.

    1987-01-01

    The PINI ion source for the TEXTOR neutral injector is fed by a new modular transistorized power supply. All modules are located in a high voltage cage on 55 kV dc against ground. The normal operation of the injectors includes frequent grid breakdowns causing transient high voltage stresses on the ion source power supplies. These stresses must not disturb the safe operation of the power supplies. The paper describes the set up for extensive testing of a supply prototype module under the expected operating conditions. The main features of this test program are reviewed and the measures taken for a safe operation are discussed. As a result of the investigations, recommendations for the installation of the power supplies at the TEXTOR NI system are given

  17. Thermal hydro-dynamic behavior of the nuclear-powered ship Mutsu in the power-up test

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Kusunoki, Tsuyoshi; Tanaka, Yoshimi; Yao, Toshiaki; Inoue, Kimio; Ochiai, Masa-aki

    1991-01-01

    The first Japanese nuclear ship N.S. Mutsu was tested with heavy load changes as ones of the full scale start-up tests. This paper describes the results of power increasing test, test of crash astern propulsion from ahead cruising, and turbine trip test; In the power increasing test, the main steam flow rate increased from 20 % flow to 70 % flow in 13 seconds; In the test of crash astern propulsion from ahead cruising, an astern turbine maneuvering handle was drawn to the position equivalent to about 60 % reactor power in 30 seconds after an ahead turbine stopping; In the turbine trip test, the ahead turbine was tripped manually at about 100 % power operation. From these tests it was verified that the Mutsu reactor is capable to respond smoothly and safely to the heavy load change without reactor scram, without workings of the pressurizer relief valve and main steam dump valve, and without need of any manual adjustment of the reactor control system. (author)

  18. Artificial enzyme-powered microfish for water-quality testing.

    Science.gov (United States)

    Orozco, Jahir; García-Gradilla, Victor; D'Agostino, Mattia; Gao, Wei; Cortés, Allan; Wang, Joseph

    2013-01-22

    We present a novel micromotor-based strategy for water-quality testing based on changes in the propulsion behavior of artificial biocatalytic microswimmers in the presence of aquatic pollutants. The new micromotor toxicity testing concept mimics live-fish water testing and relies on the toxin-induced inhibition of the enzyme catalase, responsible for the biocatalytic bubble propulsion of tubular microengines. The locomotion and survival of the artificial microfish are thus impaired by exposure to a broad range of contaminants, that lead to distinct time-dependent irreversible losses in the catalase activity, and hence of the propulsion behavior. Such use of enzyme-powered biocompatible polymeric (PEDOT)/Au-catalase tubular microengine offers highly sensitive direct optical visualization of changes in the swimming behavior in the presence of common contaminants and hence to a direct real-time assessment of the water quality. Quantitative data on the adverse effects of the various toxins upon the swimming behavior of the enzyme-powered artificial swimmer are obtained by estimating common ecotoxicological parameters, including the EC(50) (exposure concentration causing 50% attenuation of the microfish locomotion) and the swimmer survival time (lifetime expectancy). Such novel use of artificial microfish addresses major standardization and reproducibility problems as well as ethical concerns associated with live-fish toxicity assays and hence offers an attractive alternative to the common use of aquatic organisms for water-quality testing.

  19. Bootstrap Power of Time Series Goodness of fit tests

    Directory of Open Access Journals (Sweden)

    Sohail Chand

    2013-10-01

    Full Text Available In this article, we looked at power of various versions of Box and Pierce statistic and Cramer von Mises test. An extensive simulation study has been conducted to compare the power of these tests. Algorithms have been provided for the power calculations and comparison has also been made between the semi parametric bootstrap methods used for time series. Results show that Box-Pierce statistic and its various versions have good power against linear time series models but poor power against non linear models while situation reverses for Cramer von Mises test. Moreover, we found that dynamic bootstrap method is better than xed design bootstrap method.

  20. A practical algorithm for optimal operation management of distribution network including fuel cell power plants

    Energy Technology Data Exchange (ETDEWEB)

    Niknam, Taher; Meymand, Hamed Zeinoddini; Nayeripour, Majid [Electrical and Electronic Engineering Department, Shiraz University of Technology, Shiraz (Iran)

    2010-08-15

    Fuel cell power plants (FCPPs) have been taken into a great deal of consideration in recent years. The continuing growth of the power demand together with environmental constraints is increasing interest to use FCPPs in power system. Since FCPPs are usually connected to distribution network, the effect of FCPPs on distribution network is more than other sections of power system. One of the most important issues in distribution networks is optimal operation management (OOM) which can be affected by FCPPs. This paper proposes a new approach for optimal operation management of distribution networks including FCCPs. In the article, we consider the total electrical energy losses, the total electrical energy cost and the total emission as the objective functions which should be minimized. Whereas the optimal operation in distribution networks has a nonlinear mixed integer optimization problem, the optimal solution could be obtained through an evolutionary method. We use a new evolutionary algorithm based on Fuzzy Adaptive Particle Swarm Optimization (FAPSO) to solve the optimal operation problem and compare this method with Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Differential Evolution (DE), Ant Colony Optimization (ACO) and Tabu Search (TS) over two distribution test feeders. (author)

  1. Guidelines for inservice testing at nuclear power plants

    International Nuclear Information System (INIS)

    Campbell, P.

    1995-04-01

    The staff of the U.S. Nuclear Regulatory Commission (NRC) gives licensees guidelines and recommendations for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. The staff discusses the regulations; the components to be included in an inservice testing program; and the preparation and content of cold shutdown justifications, refueling outage justifications, and requests for relief from the American Society of Mechanical Engineers Code requirements. The staff also gives specific guidance on relief acceptable to the NRC and advises licensees in the use of this information at their facilities. The staff discusses the revised standard technical specifications for the inservice testing program requirements and gives guidance on the process a licensee may follow upon finding an instance of noncompliance with the Code

  2. A shift from significance test to hypothesis test through power analysis in medical research

    Directory of Open Access Journals (Sweden)

    Singh Girish

    2006-01-01

    Full Text Available Medical research literature until recently, exhibited substantial dominance of the Fisher′s significance test approach of statistical inference concentrating more on probability of type I error over Neyman-Pearson′s hypothesis test considering both probability of type I and II error. Fisher′s approach dichotomises results into significant or not significant results with a P value. The Neyman-Pearson′s approach talks of acceptance or rejection of null hypothesis. Based on the same theory these two approaches deal with same objective and conclude in their own way. The advancement in computing techniques and availability of statistical software have resulted in increasing application of power calculations in medical research and thereby reporting the result of significance tests in the light of power of the test also. Significance test approach, when it incorporates power analysis contains the essence of hypothesis test approach. It may be safely argued that rising application of power analysis in medical research may have initiated a shift from Fisher′s significance test to Neyman-Pearson′s hypothesis test procedure.

  3. Cell-Phone Tower Power System Prototype Testing for Verizon Wireless |

    Science.gov (United States)

    Advanced Manufacturing Research | NREL Cell-Phone Tower Power System Prototype Testing for Verizon Wireless Cell-Phone Tower Power System Prototype Testing for Verizon Wireless For Verizon Wireless , NREL tested a new cell-phone tower power system prototype based on DC interconnection and photovoltaics

  4. High-precision performance testing of the LHC power converters

    CERN Document Server

    Bastos, M; Dreesen, P; Fernqvist, G; Fournier, O; Hudson, G

    2007-01-01

    The magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10-6) required by LHC. One consequence of this approach was several stages of system tests: factory reception tests, CERN reception tests, integration tests , short-circuit tests and commissioning on the final load in the LHC tunnel. The majority of the power converters for LHC have now been delivered, integrated into complete converter and high-precision performance testing is well advanced. This paper presents the techniques used for high-precision testing and the results obtained.

  5. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  6. Power Cycling Test Method for Reliability Assessment of Power Device Modules in Respect to Temperature Stress

    DEFF Research Database (Denmark)

    Choi, Ui-Min; Blaabjerg, Frede; Jørgensen, Søren

    2018-01-01

    Power cycling test is one of the important tasks to investigate the reliability performance of power device modules in respect to temperature stress. From this, it is able to predict the lifetime of a component in power converters. In this paper, representative power cycling test circuits......, measurement circuits of wear-out failure indicators as well as measurement strategies for different power cycling test circuits are discussed in order to provide the current state of knowledge of this topic by organizing and evaluating current literature. In the first section of this paper, the structure...... of a conventional power device module and its related wear-out failure mechanisms with degradation indicators are discussed. Then, representative power cycling test circuits are introduced. Furthermore, on-state collector-emitter voltage (VCE ON) and forward voltage (VF) measurement circuits for wear-out condition...

  7. RF Power Requirements for PEFP SRF Cavity Test

    International Nuclear Information System (INIS)

    Kim, Han Sung; Seol, Kyung Tae; Kwon, Hyeok Jung; Cho, Yong Sub

    2011-01-01

    For the future extension of the PEFP (Proton Engineering Frontier Project) Proton linac, preliminary study on the SRF (superconducting radio-frequency) cavity is going on including a five-cell prototype cavity development to confirm the design and fabrication procedures and to check the RF and mechanical properties of a low-beta elliptical cavity. The main parameters of the cavity are like followings. - Frequency: 700 MHz - Operating mode: TM010 pi mode - Cavity type: Elliptical - Geometrical beta: 0.42 - Number of cells: 5 - Accelerating gradient: 8 MV/m - Epeak/Eacc: 3.71 - Bpeak/Eacc: 7.47 mT/(MV/m) - R/Q: 102.3 ohm - Epeak: 29.68 MV/m (1.21 Kilp.) - Geometrical factor: 121.68 ohm - Cavity wall thickness: 4.3 mm - Stiffening structure: Double ring - Effective length: 0.45 m For the test of the cavity at low temperature of 4.2 K, many subsystems are required such as a cryogenic system, RF system, vacuum system and radiation shielding. RF power required to generate accelerating field inside cavity depends on the RF coupling parameters of the power coupler and quality factor of the SRF cavity and the quality factor itself is affected by several factors such as operating temperature, external magnetic field level and surface condition. Therefore, these factors should be considered to estimate the required RF power for the SRF cavity test

  8. Power plant cable condition monitoring and testing at Georgia Power

    International Nuclear Information System (INIS)

    Champion, T.C.

    1988-01-01

    Georgia Power's Research Center has been heavily involved in the evaluation of electrical insulating materials and cables since its inception more than 17 years ago. For the past ten years that expertise has been applied to cables used in generation plants. This paper discusses the results of two test programs. The first is a quality control inspection on 169 samples of new power generation cables. The second is a material degradation evaluation on four short cable samples removed from a coal fired plant during an equipment upgrade. The new material evaluation was performed to identify the cause of a high failure rate upon initial hi-pot testing of newly installed cables. The material degradation evaluation was performed to evaluate the need for replacement of existing cables during an equipment upgrade. Results of the evaluations have led to development of a detailed proposal for a program to evaluate cable degradation and remaining life for cables used in power generation facilities

  9. Operating experiences since rise-to-power test in high temperature engineering test reactor (HTTR)

    International Nuclear Information System (INIS)

    Tochio, Daisuke; Watanabe, Shuji; Motegi, Toshihiro; Kawano, Shuichi; Kameyama, Yasuhiko; Sekita, Kenji; Kawasaki, Kozo

    2007-03-01

    The rise-to-power test of the High Temperature Engineering Test Reactor (HTTR) was actually started in April 2000. The rated thermal power of 30MW and the rated reactor outlet coolant temperature of 850degC were achieved in the middle of Dec. 2001. After that, the reactor thermal power of 30MW and the reactor outlet coolant temperature of 950degC were achieved in the final rise-to-power test in April 2004. After receiving the operation licensing at 850degC, the safety demonstration tests have conducted to demonstrate inherent safety features of the HTGRs as well as to obtain the core and plant transient data for validation of safety analysis codes and for establishment of safety design and evaluation technologies. This paper summarizes the HTTR operating experiences for six years from start of the rise-to-power test that are categorized into (1) Operating experiences related to advanced gas-cooled reactor design, (2) Operating experiences for improvement of the performance, (3) Operating experiences due to fail of system and components. (author)

  10. Thermal performance test for steam turbine of nuclear power plants

    International Nuclear Information System (INIS)

    Bu Yubing; Xu Zongfu; Wang Shiyong

    2014-01-01

    Through study of steam turbine thermal performance test of CPR1000 nuclear power plant, we solve the enthalpy calculation problems of the steam turbine in wet steam zone using heat balance method which can help to figure out the real overall heat balance diagram for the first time, and we develop a useful software for thermal heat balance calculation. Ling'ao phase II as an example, this paper includes test instrument layout, system isolation, risk control, data acquisition, wetness measurement, heat balance calculation, etc. (authors)

  11. ACIGA's high optical power test facility

    Energy Technology Data Exchange (ETDEWEB)

    Ju, L [School of Physics, University of Western Australia, Perth (Australia); Aoun, M [Computer and Information Science, Edith Cowan University, Perth (Australia); Barriga, P [School of Physics, University of Western Australia, Perth (Australia)] [and others

    2004-03-07

    Advanced laser interferometer detectors utilizing more than 100 W of laser power and with {approx}10{sup 6} W circulating laser power present many technological problems. The Australian Consortium for Interferometric Gravitational Astronomy (ACIGA) is developing a high power research facility in Gingin, north of Perth, Western Australia, which will test techniques for the next generation interferometers. In particular it will test thermal lensing compensation and control strategies for optical cavities in which optical spring effects and parametric instabilities may present major difficulties.

  12. An environmental testing facility for Space Station Freedom power management and distribution hardware

    Science.gov (United States)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  13. Wind power communication design and implementation of test environment for IEC61850/UCA2

    Energy Technology Data Exchange (ETDEWEB)

    Johnsson, A.; Svensson, J.

    2002-04-01

    Elforsk has sponsored a joint Swedish-Danish project aiming at finding and recommend a common solution for communication with wind power plants. The first stage of the work resulted in a requirement specification Functional Requirements on Communication System for Wind Turbine Applications. During the project a number of possible communication solutions were identified. The two most promising solutions have been tested in order to verify to what extent they fulfil the requirements in the specification. A version of the IEC 61850 standard based on the communication protocol MMS, has been tested at a wind power plant at Gotland, Sweden, and an OPC-interface has been tested in Denmark. This report includes a description of the design choices made for the test implementation of MMS, as well as a detailed description of the implementation of the IEC 61850/UCA2 software including information models and information exchange services. (BA)

  14. Power ramp testing method for PWR fuel rod at research reactor

    International Nuclear Information System (INIS)

    Zhou Yidong; Zhang Peisheng; Zhang Aimin; Gao Yongguang; Wang Huarong

    2003-01-01

    A tentative power ramp test for short PWR fuel rod has been conducted at the Heavy Water Research Reactor (HWRR) in China Institute of Atomic Energy (CIAE). The test fuel rod was cooled by the circulating water in the test loop. The power ramp was realized by moving solid neutron-absorbing screen around the fuel rod. The linear power of the fuel rod increased from 220 W/cm to 340 W/cm with a power ramp rate of 20 W/cm/min. The power of the fuel rod was monitored by both in-core thermal and nuclear measurement sensors in the test rig. This test provides experiences for further developing the power ramp test methods for PWR fuel rods at research reactor. (author)

  15. ac power control in the Core Flow Test Loop

    International Nuclear Information System (INIS)

    McDonald, D.W.

    1980-01-01

    This work represents a status report on a development effort to design an ac power controller for the Core Flow Test Loop. The Core Flow Test Loop will be an engineering test facility which will simulate the thermal environment of a gas-cooled fast-breeder reactor. The problems and limitations of using sinusoidal ac power to simulate the power generated within a nuclear reactor are addressed. The transformer-thyristor configuration chosen for the Core Flow Test Loop power supply is presented. The initial considerations, design, and analysis of a closed-loop controller prototype are detailed. The design is then analyzed for improved performance possibilities and failure modes are investigated at length. A summary of the work completed to date and a proposed outline for continued development completes the report

  16. Power-cooling mismatch test series. Test PCM-2A; test results report

    International Nuclear Information System (INIS)

    Cawood, G.W.; Holman, G.W.; Martinson, Z.R.; Legrand, B.L.

    1976-09-01

    The report describes the results of an in-pile experimental investigation of pre- and postcritical heat flux (CHF) behavior of a single 36-inch-long, pressurized water reactor (PWR) type, UO 2 -fueled, zircaloy-clad fuel rod. The nominal coolant conditions for pressure and temperature were representative of those found in a commercial PWR. Nine separate departures from nucleate boiling (DNB) cycles were performed by either of two different methods: (a) decreasing the coolant flow rate while the fuel rod power was held constant, or (b) increasing the fuel rod power while the coolant flow rate was held constant. DNB was obtained during eight of the nine cycles performed. For the final flow reduction, the mass flux was decreased to 6.1 x 10 5 lb/hr-ft 2 at a constant peak linear heat generation rate of 17.8 kW/ft. The fuel rod was allowed to remain in film boiling for about 210 seconds during this final flow reduction. The fuel rod remained intact during the test. Results of on-line measurements of the fuel rod behavior are presented together with discussion of instrument performance. A comparison of the data with Fuel Rod Analysis Program-Transient 2 (FRAP-T2) computer code calculations is included

  17. Overview of Power Quality and Integrated Testing at JSC

    Science.gov (United States)

    Davies, Francis

    2018-01-01

    This presentation describes the basic philosophy behind integrated testing and partially integrated testing. It lists some well known errors in space systems that were or could have been caught during integrated testing. Two examples of integrated testing at the Johnson Space Center (JSC) are mentioned, and then an overview of two test facilities that do power testing (partially integrated testing) at JSC are presented, with information on the capabilities of each. Finally a list of three projects that has problems caught during power quality or Electromagnetic Interference (EMI) testing is presented.

  18. AGS tune jump power supply design and test

    International Nuclear Information System (INIS)

    Mi, J.; Glenn, J.W.; Huang, H.; Marneris, I.; Rosas, P.; Sandberg, J.; Tan, Y.; Zhang, W.

    2011-01-01

    A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

  19. Energy saver A-sector power test results

    International Nuclear Information System (INIS)

    Martin, P.; Flora, R.; Tool, G.; Wolff, D.

    1982-01-01

    The superconducting magnets and associated cryogenic components in A-sector represent the initial phase of installation of the Fermilab superconducting accelerator, designed to accelerate proton beams to energies of 1 TeV. Installation of the magnets, comprising one-eighth of the ring, was completed in December, 1981. Cooldown and power tests took place in the first half of 1982, concurrent with main ring use for 400 GeV high energy physics. The tests described in this paper involved 151 cryogenic components in the tunnel: 94 dipoles, 24 quadrupoles, 25 spool pieces, 3 feed cans, 4 turn-around boxes and 1 bypass. Refrigeration was supplied by three satellite refrigerators, the Central Helium Liquefier, and two compressor buildings. The magnets were powered by a single power supply

  20. On-site tests on the nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.; Favennec, J.M.; Neau, P.; Preudhomme, E.

    1996-01-01

    On-site tests and experiments are performed by EDF Research and Development Division on the nuclear power plants to assess the behaviour of major components submitted to thermal and vibratory solicitations. On-going studies deal with the qualification of new nuclear power plant standard and with the feedback of plants under operation. The tests, particularly the investigation tests, correspond to large investments and entail an important data volume which must ensure the continuity over a long period of the order of magnitude of the in-service plant life (around 40 years). This paper addresses the on-site experimental activities, describes the means to be used, and gives an example: the qualification of SG of new 1450 MW nuclear power plants. (author)

  1. Evaluation of effective energy deposition in test fuel during power burst experiment in NSRR

    International Nuclear Information System (INIS)

    Ohnishi, Nobuaki; Inabe, Teruo

    1982-01-01

    In an inpile experiment to study the fuel behavior under reactivity-initiated accident conditions, it is of great importance to understand the time-dependent characteristics of the energy deposited in the test fuel by burst power. The evaluation of the time-dependent energy deposition requires the knowledge of the fission rates and energy deposition per fission in the test fuel, both as a function of time. In the present work, the authors attempted to evaluate the relative fission rate change in the test fuel subjected to the power burst testing in the NSRR through the measurements and analyses of the fission power changes in the NSRR. Utilizing a micro fission chamber and a conventional larger fission chamber, they successfully measured the reactor fission power change ranging over a dozen of decades in magnitude and a thousand seconds in time. The measured power transient agreed quite well with calculated results. In addition, the time-dependent energy deposition per fission in the test fuel including the energy contribution from the driver core was analytically evaluated. The analyses indicate that the energy of about 175 MeV/fission is promptly deposited in the test fuel and that the additional energy of about 11 MeV is deposited afterwards. Finally the fractions of energy deposited in the test fuel until various times after power burst were determined by coupling the time-dependent relative fissions and energy deposition per fission in the test fuel. The prompt energy deposition ranges from about 50 to 80% of the total energy deposition for the reactivity insertion between 1.5 and 4.7 $, and the remaining is the delayed energy deposition. (author)

  2. Advanced Test Accelerator (ATA) pulse power technology development

    International Nuclear Information System (INIS)

    Reginato, L.L.; Branum, D.; Cook, E.

    1981-01-01

    The Advanced Test Accelerator (ATA) is a pulsed linear induction accelerator with the following design parameters: 50 MeV, 10 kA, 70 ns, and 1 kHz in a ten-pulse burst. Acceleration is accomplished by means of 190 ferrite-loaded cells, each capable of maintaining a 250 kV voltage pulse for 70 ns across a 1-inch gap. The unique characteristic of this machine is its 1 kHz burst mode capability at very high currents. This paper dscribes the pulse power development program which used the Experimental Test Accelerator (ETA) technology as a starting base. Considerable changes have been made both electrically and mechanically in the pulse power components with special consideration being given to the design to achieve higher reliability. A prototype module which incorporates all the pulse power components has been built and tested for millions of shots. Prototype components and test results are described

  3. Probabilistic seismic safety assessment of a CANDU 6 nuclear power plant including ambient vibration tests: Case study

    Energy Technology Data Exchange (ETDEWEB)

    Nour, Ali [Hydro Québec, Montréal, Québec H2L4P5 (Canada); École Polytechnique de Montréal, Montréal, Québec H3C3A7 (Canada); Cherfaoui, Abdelhalim; Gocevski, Vladimir [Hydro Québec, Montréal, Québec H2L4P5 (Canada); Léger, Pierre [École Polytechnique de Montréal, Montréal, Québec H3C3A7 (Canada)

    2016-08-01

    Highlights: • In this case study, the seismic PSA methodology adopted for a CANDU 6 is presented. • Ambient vibrations testing to calibrate a 3D FEM and to reduce uncertainties is performed. • Procedure for the development of FRS for the RB considering wave incoherency effect is proposed. • Seismic fragility analysis for the RB is presented. - Abstract: Following the 2011 Fukushima Daiichi nuclear accident in Japan there is a worldwide interest in reducing uncertainties in seismic safety assessment of existing nuclear power plant (NPP). Within the scope of a Canadian refurbishment project of a CANDU 6 (NPP) put in service in 1983, structures and equipment must sustain a new seismic demand characterised by the uniform hazard spectrum (UHS) obtained from a site specific study defined for a return period of 1/10,000 years. This UHS exhibits larger spectral ordinates in the high-frequency range than those used in design. To reduce modeling uncertainties as part of a seismic probabilistic safety assessment (PSA), Hydro-Québec developed a procedure using ambient vibrations testing to calibrate a detailed 3D finite element model (FEM) of the containment and reactor building (RB). This calibrated FE model is then used for generating floor response spectra (FRS) based on ground motion time histories compatible with the UHS. Seismic fragility analyses of the reactor building (RB) and structural components are also performed in the context of a case study. Because the RB is founded on a large circular raft, it is possible to consider the effect of the seismic wave incoherency to filter out the high-frequency content, mainly above 10 Hz, using the incoherency transfer function (ITF) method. This allows reducing significantly the non-necessary conservatism in resulting FRS, an important issue for an existing NPP. The proposed case study, and related methodology using ambient vibration testing, is particularly useful to engineers involved in seismic re-evaluation of

  4. Utility Test Results of a 2-Megawatt, 10-Second Reserve-Power System

    Energy Technology Data Exchange (ETDEWEB)

    BALL,GREG J.; NORRIS,BENJAMIN L.

    1999-10-01

    This report documents the 1996 evaluation by Pacific Gas and Electric Company of an advanced reserve-power system capable of supporting 2 MW of load for 10 seconds. The system, developed under a DOE Cooperative Agreement with AC Battery Corporation of East Troy, Wisconsin, contains battery storage that enables industrial facilities to ''ride through'' momentary outages. The evaluation consisted of tests of system performance using a wide variety of load types and operating conditions. The tests, which included simulated utility outages and voltage sags, demonstrated that the system could provide continuous power during utility outages and other disturbances and that it was compatible with a variety of load types found at industrial customer sites.

  5. Power ramp tests of BWR-MOX fuels

    International Nuclear Information System (INIS)

    Asahi, K.; Oguma, M.; Higuchi, S.; Kamimua, K.; Shirai, Y.; Bodart, S.; Mertens, L.

    1996-01-01

    Power ramp test of BWR-MOX and UO 2 fuel rods base irradiated up to about 60 GWd/t in Dodewaard reactor have been conducted in BR2 reactor in the framework of the international DOMO programme. The MOX pellets were provided by BN (MIMAS process) and PNC (MH method). The MOX fuel rods with Zr-liner and non-liner cladding and the UO 2 fuel rods with Zr-liner cladding remained intact during the stepwise power ramp tests to about 600 W/cm, even at about 60 GWd/t

  6. High power test of low enriched UZrH

    Energy Technology Data Exchange (ETDEWEB)

    West, Gordon [General Atomic Co., San Diego, CA (United States)

    1980-07-01

    TRIGA-LEU fuel is currently undergoing high power tests in the 30 MW Oak Ridge Reactor. These tests are being funded by the Department of Energy through the RERTR program [Reduced Enrichment Research and Test Reactor program administered by Argonne National Laboratory] and began in mid-December, 1979 on a 16-rod shrouded cluster. The fuel rods are 0.51 in. 0D, clad with 0.16 in. Incoloy and the fuel length is 22 in. It is planned to test the UZrH fuel with 45, 30 and 20 wt-% U (nominal 20% enriched), to burnup values of about 50% of the contained U-235 in the 45 wt-% rods and about 40% and 35% burnup in the 30 wt-%, and 20 wt-% U fuel. It will take about 2 years of irradiation to produce the desired burnup in the 45 wt-% U fuel. Currently being tested are six 45 wt-% U and five 30 wt-% U rods. The remaining 5 rods are stainless steel dummies which were necessary to meet an operational requirement of the ORR which limits the power generation in a fuel rod to a value which would not raise the coolant temperature above the saturation level. Maximum calculated fuel rod powers were 40 kW, which would produce a fuel temperature of about 650 deg. C. The measured temperatures are about 400 deg. C and 350 deg. C for the 45 and 30 wt-% U fuel, respectively. Flow and {delta}T measurements show the cluster power generation to be about 250 kW, or about 65% of the design value. Reasons for the lower than expected power are still being evaluated and a proposal has been submitted for rearrangement of the fuel rods within the cluster to raise the powers and temperatures in the TRIGA-LEU fuel rods. (author)

  7. Analysis of Power Transfer Efficiency of Standard Integrated Circuit Immunity Test Methods

    Directory of Open Access Journals (Sweden)

    Hai Au Huynh

    2015-01-01

    Full Text Available Direct power injection (DPI and bulk current injection (BCI methods are defined in IEC 62132-3 and IEC 62132-4 as the electromagnetic immunity test method of integrated circuits (IC. The forward power measured at the RF noise generator when the IC malfunctions is used as the measure of immunity level of the IC. However, the actual power that causes failure in ICs is different from forward power measured at the noise source. Power transfer efficiency is used as a measure of power loss of the noise injection path. In this paper, the power transfer efficiencies of DPI and BCI methods are derived and validated experimentally with immunity test setup of a clock divider IC. Power transfer efficiency varies significantly over the frequency range as a function of the test method used and the IC input impedance. For the frequency range of 15 kHz to 1 GHz, power transfer efficiency of the BCI test was constantly higher than that of the DPI test. In the DPI test, power transfer efficiency is particularly low in the lower test frequency range up to 10 MHz. When performing the IC immunity tests following the standards, these characteristics of the test methods need to be considered.

  8. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  9. Testing Situation Awareness Network for the Electrical Power Infrastructure

    Directory of Open Access Journals (Sweden)

    Rafał Leszczyna

    2016-09-01

    Full Text Available The contemporary electrical power infrastructure is exposed to new types of threats. The cause of such threats is related to the large number of new vulnerabilities and architectural weaknesses introduced by the extensive use of Information and communication Technologies (ICT in such complex critical systems. The power grid interconnection with the Internet exposes the grid to new types of attacks, such as Advanced Persistent Threats (APT or Distributed-Denial-ofService (DDoS attacks. When addressing this situation the usual cyber security technologies are prerequisite, but not sufficient. To counter evolved and highly sophisticated threats such as the APT or DDoS, state-of-the-art technologies including Security Incident and Event Management (SIEM systems, extended Intrusion Detection/Prevention Systems (IDS/IPS and Trusted Platform Modules (TPM are required. Developing and deploying extensive ICT infrastructure that supports wide situational awareness and allows precise command and control is also necessary. In this paper the results of testing the Situational Awareness Network (SAN designed for the energy sector are presented. The purpose of the tests was to validate the selection of SAN components and check their operational capability in a complex test environment. During the tests’ execution appropriate interaction between the components was verified.

  10. Optimization of the powering tests of the LHC superconducting circuits

    CERN Document Server

    Bellesia, B; Denz, R; Fernandez-Robles, C; Pojer, M; Saban, R; Schmidt, R; Solfaroli Camillocci, M; Thiesen, H; Vergara Fernández, A

    2010-01-01

    The Large Hadron Collider has (LHC) 1572 superconducting circuits which are distributed along the eight 3.5 km LHC sectors [1]. Time and resources during the commissioning of the LHC technical systems were mostly consumed by the powering tests of each circuit. The tests consisted in carrying out several powering cycles at different current levels for each superconducting circuit. The Hardware Commissioning Coordination was in charge of planning, following up and piloting the execution of the test program. The first powering test campaign was carried out in summer 2007 for sector 7-8 with an expected duration of 12 weeks. The experience gained during these tests was used by the commissioning team for minimising the duration of the following powering campaigns to comply with the stringent LHC project deadlines. Improvements concerned several areas: strategy, procedures, control tools, automatization, and resource allocation led to an average daily test rate increase from 25 to 200 tests per day. This paper desc...

  11. Development and Testing of High Current Hollow Cathodes for High Power Hall Thrusters

    Science.gov (United States)

    Kamhawi, Hani; Van Noord, Jonathan

    2012-01-01

    NASA's Office of the Chief Technologist In-Space Propulsion project is sponsoring the testing and development of high power Hall thrusters for implementation in NASA missions. As part of the project, NASA Glenn Research Center is developing and testing new high current hollow cathode assemblies that can meet and exceed the required discharge current and life-time requirements of high power Hall thrusters. This paper presents test results of three high current hollow cathode configurations. Test results indicated that two novel emitter configurations were able to attain lower peak emitter temperatures compared to state-of-the-art emitter configurations. One hollow cathode configuration attained a cathode orifice plate tip temperature of 1132 degC at a discharge current of 100 A. More specifically, test and analysis results indicated that a novel emitter configuration had minimal temperature gradient along its length. Future work will include cathode wear tests, and internal emitter temperature and plasma properties measurements along with detailed physics based modeling.

  12. Brayton-Cycle Power-Conversion Unit Tested With Ion Thruster

    Science.gov (United States)

    Hervol, David S.

    2005-01-01

    Nuclear electric propulsion has been identified as an enabling technology for future NASA space science missions, such as the Jupiter Icy Moons Orbiter (JIMO) now under study. An important element of the nuclear electric propulsion spacecraft is the power conversion system, which converts the reactor heat to electrical power for use by the ion propulsion system and other spacecraft loads. The electrical integration of the power converter and ion thruster represents a key technical challenge in making nuclear electric propulsion technology possible. This technical hurdle was addressed extensively on December 1, 2003, when a closed- Brayton-cycle power-conversion unit was tested with a gridded ion thruster at the NASA Glenn Research Center. The test demonstrated end-to-end power throughput and marked the first-ever coupling of a Brayton turbo alternator and a gridded ion thruster, both of which are candidates for use on JIMO-type missions. The testing was conducted at Glenn's Vacuum Facility 6, where the Brayton unit was installed in the 3-m-diameter vacuum test port and the ion thruster was installed in the 7.6-m-diameter main chamber.

  13. Statistical power analyses using G*Power 3.1: tests for correlation and regression analyses.

    Science.gov (United States)

    Faul, Franz; Erdfelder, Edgar; Buchner, Axel; Lang, Albert-Georg

    2009-11-01

    G*Power is a free power analysis program for a variety of statistical tests. We present extensions and improvements of the version introduced by Faul, Erdfelder, Lang, and Buchner (2007) in the domain of correlation and regression analyses. In the new version, we have added procedures to analyze the power of tests based on (1) single-sample tetrachoric correlations, (2) comparisons of dependent correlations, (3) bivariate linear regression, (4) multiple linear regression based on the random predictor model, (5) logistic regression, and (6) Poisson regression. We describe these new features and provide a brief introduction to their scope and handling.

  14. Evaluation of the linear power of HANARO test fuel bundles

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Choong Sung; Seo, C. G.; Lee, B. C.; Kim, H. R

    2001-02-01

    The HANARO fuel was developed by AECL and it is configured in a bundle of rods containing uranium silicide. AECL has conducted a variety of tests using specimen in order to achieve its qualification and licensing and the highest linear power was evaluated to be 112.8kW/m. In design stage of HANARO, the best estimated maximum linear power at hot spot was found to occur in the transition core from the initial to the equilibrium and its value was 108kW/m, which exceeds 112.8kW/m if the physics uncertainty of the HANARO nuclear design model is taken into account. Consequently, the licensing body issued the conditional permit to operate HANARO and the fuel integrity at the linear power higher than 112.8kW/m was requested to be confirmed through irradiation tests by realizing its repeatability. Hereby, KAERI designed uninstrumented and instrumented test fuel bundles and conducted their burnup tests. In parallel with the tests, the nuclear design model has been revised and updated to enable us to pursue the pin-by-pin power history. This report describes the best estimated power history of the test fuel bundles using the revised model. In conclusion, HANARO fuel keeps its integrity at power condition greater than 120kW/m.

  15. Power cycling test and failure analysis of molded Intelligent Power IGBT Module under different temperature swing durations

    DEFF Research Database (Denmark)

    Choi, Uimin; Blaabjerg, Frede; Jørgensen, Søren

    2016-01-01

    on the lifetime of 600 V, 30 A, 3-phase molded Intelligent PowerModules (IPM) and their failuremechanismsare investigated. The study is based on the accelerated power cycling test results of 36 samples under 6 different conditions and tests are performed under realistic electrical conditions by an advanced power...

  16. Results of stress tests of European nuclear power plants after the Fukushima-Daiichi accident

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena

    2012-01-01

    In response to the Fukushima-Daiichi accident, the European Council laid down the requirement that a transparent and comprehensive risk assessment exercise ('stress tests') be carried out at each European nuclear power plant. The stress tests concentrated on the nuclear power plants' safety margins in the light of the lessons learned from the accident. The reviews focused on natural external events including earthquake, tsunami and extreme weather, loss of safety functions, and severe accident management. The stress test procedure comprised 3 steps: (i) The nuclear facility operators performed the stress tests and prepared proposals for safety improvements. (ii) The national regulators performed independent reviews of the stress tests and prepared national reports. (iii) The reports submitted by the national regulators were subjected to review at a European level. The article describes the scope of the stress tests and their results, verified at the European level. (orig.)

  17. Power systems for the RHIC first sextant test

    International Nuclear Information System (INIS)

    Schultheiss, C.; Bruno, D.; Feng, P.K.

    1997-01-01

    The first sextant test of the RHIC project is an opportunity to evaluate the many systems that must work together for the accelerator to operate. For the main dipole string, the actual main quadrupole power supply with its DSP regulator and output circuit compartment will be used. Temporary supplies will be used for the main quadrupole string, quadrupole offset, and quadrupole shunt supplies. This will let the authors both measure the performance of the main supply as well as determine the interaction among other power elements in the circuit. Correction elements will also be powered. The actual gamma-T power supplies will be used, as well as temporary supplies for the dipole correctors and sextupole supplies. Some of these units are required for beam to be transported, others are to be operated without beam to measure their performance, and how they interact with their superconducting loads. The power supply equipment, and that of other systems, required an infrastucture of AC power and output cable distribution in the RHIC tunnel, outlying service buildings, and interconnecting the tunnel to the service buildings. This note will describe the performance of the RHIC power supply systems during the sextant test, and the experience gained from this exercise

  18. Power ramping test in the JMTR for PCI study of water reactor fuel

    International Nuclear Information System (INIS)

    Nakata, H.; Kanbara, M.; Ichikawa, M.

    1984-01-01

    Power ramping test is essential for PCI study of water reactor fuel. Boiling water capsules have been used for the tests in the JMTR. Heat generation of fuel rod in the capsule can be changed by the He-3 power control facility during reactor operation. Four specially designed fuel rods have been ramped to about 41-43 kW/m; two of them have small gaps filled with iodine, the other two are equipped with centerline temperature thermocouple. Fuel rod elongation detector is equipped to each capsule. For the fuel rods with small gap, unique contraction followed by ordinary fuel relaxation behaviour was observed right after the fast ramping. None of them failed. Future programme includes a series of tests of fuel rods irradiated in the high-pressure water loop at the JMTR and a verification test of remedy fuel which allows daily-load-following operation of BWRs. (author)

  19. Analysis of the imbalance price scheme in the Spanish electricity market: A wind power test case

    International Nuclear Information System (INIS)

    Bueno-Lorenzo, Miriam; Moreno, M. Ángeles; Usaola, Julio

    2013-01-01

    This work investigates the interaction between wind power and electricity markets. The paper is focused on balancing markets pricing policies. The proposal of a new imbalance price scheme is included and conveniently evaluated. This proposed scheme tries to minimise the use of ancillary services to compensate for deviations in searching for a more efficient market design. The effectiveness of imbalance prices as market signals is also examined, and policy recommendations regarding imbalance services are discussed. Two test cases are included that analyse the participation of a wind power producer in the Spanish electricity market using a stochastic optimisation strategy. For this purpose, the uncertainty of the variables is considered, i.e., wind power production and prediction, intraday and imbalance prices. Test cases were run with real data for 10 months, and realistic results are presented along with a hypothetical test case. The regulation of the imbalance prices may not be adequate for the Spanish electricity market because an error drop is not sufficiently encouraged. Therefore, we suggest the application of a new imbalance price scheme, which includes an additional constraint. The conclusions of this paper can be assumed to be general policy recommendations

  20. Probing dark energy with cluster counts and cosmic shear power spectra: including the full covariance

    International Nuclear Information System (INIS)

    Takada, Masahiro; Bridle, Sarah

    2007-01-01

    Several dark energy experiments are available from a single large-area imaging survey and may be combined to improve cosmological parameter constraints and/or test inherent systematics. Two promising experiments are cosmic shear power spectra and counts of galaxy clusters. However, the two experiments probe the same cosmic mass density field in large-scale structure, therefore the combination may be less powerful than first thought. We investigate the cross-covariance between the cosmic shear power spectra and the cluster counts based on the halo model approach, where the cross-covariance arises from the three-point correlations of the underlying mass density field. Fully taking into account the cross-covariance, as well as non-Gaussian errors on the lensing power spectrum covariance, we find a significant cross-correlation between the lensing power spectrum signals at multipoles l∼10 3 and the cluster counts containing halos with masses M∼>10 14 M o-dot . Including the cross-covariance for the combined measurement degrades and in some cases improves the total signal-to-noise (S/N) ratios up to ∼±20% relative to when the two are independent. For cosmological parameter determination, the cross-covariance has a smaller effect as a result of working in a multi-dimensional parameter space, implying that the two observables can be considered independent to a good approximation. We also discuss the fact that cluster count experiments using lensing-selected mass peaks could be more complementary to cosmic shear tomography than mass-selected cluster counts of the corresponding mass threshold. Using lensing selected clusters with a realistic usable detection threshold ((S/N) cluster ∼6 for a ground-based survey), the uncertainty on each dark energy parameter may be roughly halved by the combined experiments, relative to using the power spectra alone

  1. NSTAR Ion Thruster and Breadboard Power Processor Functional Integration Test Results

    Science.gov (United States)

    Hamley, John A.; Pinero, Luis R.; Rawlin, Vincent K.; Miller, John R.; Myers, Roger M.; Bowers, Glen E.

    1996-01-01

    A 2.3 kW Breadboard Power Processing Unit (BBPPU) was developed as part of the NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) Program. The NSTAR program will deliver an electric propulsion system based on a 30 cm xenon ion thruster to the New Millennium (NM) program for use as the primary propulsion system for the initial NM flight. The final development test for the BBPPU, the Functional Integration Test, was carried out to demonstrate all aspects of BBPPU operation with an Engineering Model Thruster. Test objectives included: (1) demonstration and validation of automated thruster start procedures, (2) demonstration of stable closed loop control of the thruster beam current, (3) successful response and recovery to thruster faults, and (4) successful safing of the system during simulated spacecraft faults. These objectives were met over the specified 80-120 VDC input voltage range and 0.5-2.3 output power capability of the BBPPU. Two minor anomalies were noted in discharge and neutralizer keeper current. These anomalies did not affect the stability of the system and were successfully corrected.

  2. Guidelines for inservice testing at nuclear power plants. Draft report for comment

    International Nuclear Information System (INIS)

    Campbell, P.

    1993-11-01

    In this report, the staff gives licensees guidelines for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. The report includes U.S. Nuclear Regulatory Commission (NRC) guidance and recommendations on inservice testing issues. The staff discusses the regulations, the components to be included in an inservice testing program, and the preparation and content of cold shutdown and refueling outage justifications and requests for relief from the American Society of Mechanical Engineers Code requirements. The staff also gives specific guidance on relief acceptable to the NRC and advises licensees in the use of this information for application at their facilities. The staff discusses the revised standard technical specifications for the inservice testing program requirements and gives guidance on the process a licensee may follow upon finding an instance of noncompliance with the Code

  3. S-band 45 MW peak power test facility at RRCAT

    International Nuclear Information System (INIS)

    Wanmode, A. Yashwant; Reddy, Sivananda; Mulchandani, J.; Mohania, Praveen; Shrivastava, B. Purushottam

    2015-01-01

    RRCAT is engaged in the design and development of high energy electron LINAC as future injectors for the Booster Synchrotron for Indus-1 and Indus-2 SRS. The high energy LINAC will need microwave power over 30 MW depending on the number of structures to be energized. In order to have advance preparations for this development a 45 MW S-Band test facility has been designed and developed at RRCAT. The test stand is built around a 45 MW peak power S-band pulsed klystron, A conventional pulse forming network based modulator for klystron has been designed and developed. The WR-284 waveguide transmission system consisting of dual directional couplers, SF 6 gas pressurization unit, high power waveguide load and arc sensor has been developed and interfaced with the klystron. The klystron has been successfully tested up to 30 MW peak power at 2856 MHz on SF 6 pressurized waveguide line. A solid state S Band driver amplifier up to 1 kW output power was designed developed for driving the klystron. This paper describes the results of 30 MW peak power test of this facility. (author)

  4. Test results of an organic Rankine-cycle power module for a small community solar thermal power experiment

    Science.gov (United States)

    Clark, T. B.

    1985-01-01

    The organic Rankine-cycle (ORC) power conversion assembly was tested. Qualification testing of the electrical transport subsystem was also completed. Test objectives were to verify compatibility of all system elements with emphasis on control of the power conversion assembly, to evaluate the performance and efficiency of the components, and to validate operating procedures. After 34 hours of power generation under a wide range of conditions, the net module efficiency exceeded 18% after accounting for all parasitic losses.

  5. Partial discharge testing of in-situ power cable accessories

    Energy Technology Data Exchange (ETDEWEB)

    Orban, H. E.

    2002-07-01

    An overview of commercially available diagnostic methods for in-situ power cable accessories is given and relevant field experiences with these diagnostics are described. The discussion includes both PILC and polymeric insulated cables. Two major types of degradation are most frequently involved in cable systems. One is an overall condition caused by chemical aging and /or water treeing. Diagnostics for this type of aging include dissipation factor (loss angle), harmonic analysis, return voltage, isothermal relaxation current, dielectric response, or dc leakage current. The second type of degradation is discrete or incremental; condition assessment utilizes dissipation factor measurements or partial discharge (PD) level measurements. The focus in this paper is on PD diagnostics, especially off-line methods such as the 60 Hz test, the combined AC and VLF diagnostic, and the oscillating wave test system test. Among on-line diagnostics, ultrasonic detection of partial discharge and measurement of partial discharge by installing direct, capacitive or inductive couplers near cable accessories, are described. Overall, partial discharge detection and location in cable accessories is considered inadequate, since interpretation of results is difficult due to the number of variables involved. 28 refs., 1 tab.

  6. Data acquisition system for medium power neutral beam test facility

    International Nuclear Information System (INIS)

    Stewart, C.R. Jr.; Francis, J.E. Jr.; Hammons, C.E.; Dagenhart, W.K.

    1978-06-01

    The Medium Power Neutral Beam Test Facility at Oak Ridge National Laboratory was constructed in order to develop, test, and condition powerful neutral beam lines for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors source performance, beam characteristics, and power deposition profiles to determine if the beam line is operating up to its design specifications. The speed of the computer system is utilized to provide near-real-time analysis of experimental data. Analysis of the data is presented as numerical tabulation and graphic display

  7. Controllable Grid Interface for Testing Ancillary Service Controls and Fault Performance of Utility-Scale Wind Power Generation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; Koralewicz, Przemyslaw; Wallen, Robb; Muljadi, Eduard

    2017-02-01

    The rapid expansion of wind power has led many transmission system operators to demand modern wind power plants to comply with strict interconnection requirements. Such requirements involve various aspects of wind power plant operation, including fault ride-through and power quality performance as well as the provision of ancillary services to enhance grid reliability. During recent years, the National Renewable Energy Laboratory (NREL) of the U.S. Department of Energy has developed a new, groundbreaking testing apparatus and methodology to test and demonstrate many existing and future advanced controls for wind generation (and other renewable generation technologies) on the multimegawatt scale and medium-voltage levels. This paper describes the capabilities and control features of NREL's 7-MVA power electronic grid simulator (also called a controllable grid interface, or CGI) that enables testing many active and reactive power control features of modern wind turbine generators -- including inertial response, primary and secondary frequency responses, and voltage regulation -- under a controlled, medium-voltage grid environment. In particular, this paper focuses on the specifics of testing the balanced and unbalanced fault ride-through characteristics of wind turbine generators under simulated strong and weak medium-voltage grid conditions. In addition, this paper provides insights on the power hardware-in-the-loop feature implemented in the CGI to emulate (in real time) the conditions that might exist in various types of electric power systems under normal operations and/or contingency scenarios. Using actual test examples and simulation results, this paper describes the value of CGI as an ultimate modeling validation tool for all types of 'grid-friendly' controls by wind generation.

  8. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  9. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Wilson, J.H.; Van Ness, H.W.

    1980-01-01

    In late August 1978, a fixed price procurement contract for $25,000,000 was awarded to Aydin Energy Division, Palo Alto, California, for the design, manufacture, installation and acceptance testing of the Lawrence Livermore National Laboratory Mirror Fusion Test Facility (MFTF) Sustaining Neutral Beam Power Supply System (SNBPSS). This system of 24 power supply sets will provide the conditioned power for the 24 neutral beam source modules. Each set will provide the accel potential the arc power, the filament power, and the suppressor power for its associated neutral beam source module. The design and development of the SNBPSS has progressed through the final design phase and is now in production. Testing of the major sub-assembly power supply is proceeding at Aydin and the final acceptance testing of the first two power supplies at LLNL is expected to be completed this year

  10. Concentrating Solar Power Central Receiver Panel Component Fabrication and Testing FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    McDowell, Michael W [Pratt & Whitney Rocketdyne; Miner, Kris [Pratt & Whitney Rocketdyne

    2013-03-30

    The objective of this project is to complete a design of an advanced concentrated solar panel and demonstrate the manufacturability of key components. Then confirm the operation of the key components under prototypic solar flux conditions. This work is an important step in reducing the levelized cost of energy (LCOE) from a central receiver solar power plant. The key technical risk to building larger power towers is building the larger receiver systems. Therefore, this proposed technology project includes the design of an advanced molten salt prototypic sub-scale receiver panel that can be utilized into a large receiver system. Then complete the fabrication and testing of key components of the receive design that will be used to validate the design. This project shall have a significant impact on solar thermal power plant design. Receiver panels of suitable size for utility scale plants are a key element to a solar power tower plant. Many subtle and complex manufacturing processes are involved in producing a reliable, robust receiver panel. Given the substantial size difference between receiver panels manufactured in the past and those needed for large plant designs, the manufacture and demonstration on prototype receiver panel components with representative features of a full-sized panel will be important to improving the build process for commercial success. Given the thermal flux limitations of the test facility, the panel components cannot be rendered full size. Significance changes occurred in the projects technical strategies from project initiation to the accomplishments described herein. The initial strategy was to define cost improvements for the receiver, design and build a scale prototype receiver and test, on sun, with a molten salt heat transport system. DOE had committed to constructing a molten salt heat transport loop to support receiver testing at the top of the NSTTF tower. Because of funding constraints this did not happen. A subsequent plan to

  11. Shaking table test study on seismic performance of dehydrogenation fan for nuclear power plants

    International Nuclear Information System (INIS)

    Liu Kaiyan; Shi Weixing; Cao Jialiang; Wang Yang

    2011-01-01

    Seismic performance of the dehydrogenation fan for nuclear power plants was evaluated based on the shaking table test of earthquake simulation. Dynamic characteristics including the orthogonal tri-axial fundamental frequencies and equivalent damping ratios were measured by the white noise scanning method. Artificial seismic waves were generated corresponding to the floor acceleration response spectra for nuclear power plants. Furthermore, five OBE and one SSE shaking table tests for dehydrogenation fan were performed by using the artificial seismic waves as the seismic inputs along the orthogonal axis simultaneity. Operating function of dehydrogenation fan was monitored and observed during all seismic tests, and performance indexes of dehydrogenation fan were compared before and after seismic tests. The results show that the structural integrity and operating function of the dehydrogenation fan are perfect during all seismic tests; and the performance indexes of the dehydrogenation fan can remain consistent before and after seismic tests; the seismic performance of the dehydrogenation fan can satisfy relevant technical requirements. (authors)

  12. Demonstration test for reliability of valves for atomic power plants

    International Nuclear Information System (INIS)

    Hosaka, Shiro

    1978-01-01

    The demonstration test on the reliability of valves for atomic power plants being carried out by the Nuclear Engineering Test Center is reported. This test series is conducted as six-year project from FY 1976 to FY 1981 at the Isogo Test Center. The demonstration test consists of (1) environmental test, (2) reaction force test, (3) vibration test, (4) stress measurement test, (5) operational characteristic test, (6) flow resistance coefficient measuring test, (7) leakage test and (8) safety valve and relief valve test. These contents are explained about the special requirements for nuclear use, for example, the enviornmental condition after the design base accident of PWRs and BWRs, the environmental test sequence for isolation valves of containment vessels under the emergency condition, the seismic test condition for valves of nuclear use, the various stress measurements under thermal transient conditions, the leak test after 500 cycles between the normal operating conditions for PWRs and BWRs and the start up conditions and so on. As for the testing facilities, the whole flow diagram is shown, in which the environmental test section, the vibration test section, the steam test section, the hot water test section, the safety valve test section and main components are included. The specifications of each test section and main components are presented. (Nakai, Y.)

  13. Stirling Convertor Performance Mapping Test Results for Future Radioisotope Power Systems

    Science.gov (United States)

    Qiu, Songgang; Peterson, Allen A.; Faultersack, Franklyn D.; Redinger, Darin L.; Augenblick, John E.

    2004-02-01

    Long-life radioisotope-fueled generators based on free-piston Stirling convertors are an energy-conversion solution for future space applications. The high efficiency of Stirling machines makes them more attractive than the thermoelectric generators currently used in space. Stirling Technology Company (STC) has been performance-testing its Stirling generators to provide data for potential system integration contractors. This paper describes the most recent test results from the STC RemoteGen™ 55 W-class Stirling generators (RG-55). Comparisons are made between the new data and previous Stirling thermodynamic simulation models. Performance-mapping tests are presented including variations in: internal charge pressure, cold end temperature, hot end temperature, alternator temperature, input power, and variation of control voltage.

  14. Fission Surface Power Technology Demonstration Unit Test Results

    Science.gov (United States)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Sanzi, James L.

    2016-01-01

    The Fission Surface Power (FSP) Technology Demonstration Unit (TDU) is a system-level demonstration of fission power technology intended for use on manned missions to Mars. The Baseline FSP systems consists of a 190 kWt UO2 fast-spectrum reactor cooled by a primary pumped liquid metal loop. This liquid metal loop transfers heat to two intermediate liquid metal loops designed to isolate fission products in the primary loop from the balance of plant. The intermediate liquid metal loops transfer heat to four Stirling Power Conversion Units (PCU), each of which produce 12 kWe (48 kW total) and reject waste heat to two pumped water loops, which transfer the waste heat to titanium-water heat pipe radiators. The FSP TDU simulates a single leg of the baseline FSP system using an electrically heater core simulator, a single liquid metal loop, a single PCU, and a pumped water loop which rejects the waste heat to a Facility Cooling System (FCS). When operated at the nominal operating conditions (modified for low liquid metal flow) during TDU testing the PCU produced 8.9 kW of power at an efficiency of 21.7 percent resulting in a net system power of 8.1 kW and a system level efficiency of 17.2 percent. The reduction in PCU power from levels seen during electrically heated testing is the result of insufficient heat transfer from the NaK heater head to the Stirling acceptor, which could not be tested at Sunpower prior to delivery to the NASA Glenn Research Center (GRC). The maximum PCU power of 10.4 kW was achieved at the maximum liquid metal temperature of 875 K, minimum water temperature of 350 K, 1.1 kg/s liquid metal flow, 0.39 kg/s water flow, and 15.0 mm amplitude at an efficiency of 23.3 percent. This resulted in a system net power of 9.7 kW and a system efficiency of 18.7 percent.

  15. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  16. Test results on parabolic dish concentrators for solar thermal power systems

    Science.gov (United States)

    Jaffe, Leonard D.

    1989-01-01

    This paper presents results of development testing of various solar thermal parabolic dish concentrators. The concentrators were mostly designed for the production of electric power using dish-mounted Rankine, Brayton or Stirling cycle engines, intended to be produced at low cost. Measured performance for various dishes included optical efficiencies ranging from 0.32 to 0.86 at a geometric concentration ratio of 500, and from about 0.09 to 0.85 at a geometric concentration ratio of 3000. Some malfunctions were observed. The tests should provide operating information of value in developing concentrators with improved performance and reduced maintenance.

  17. The Test-Retest Reliability of New Generation Power Indices of Wingate All-Out Test

    Directory of Open Access Journals (Sweden)

    Ozgur Ozkaya

    2018-04-01

    Full Text Available Although reliability correlations of traditional power indices of the Wingate test have been well documented, no study has analyzed new generation power indices based on milliseconds obtained from a Peak Bike. The purpose of this study was to investigate the retest reliability of new generation power indices. Thirty-two well-trained male athletes who were specialized in basketball, football, tennis, or track and field volunteered to take part in the study (age: 24.3 ± 2.2 years; body mass: 77 ± 8.3 kg; height: 180.3 ± 6.3 cm. Participants performed two Wingate all-out sessions on two separate days. Intra-class correlation coefficient (ICC, standard error measurement (SEM, smallest real differences (SRD and coefficient of variation (CV scores were analyzed based on the test and retest data. Reliability results of traditional power indices calculated based on 5-s means such as peak power, average power, power drop, and fatigue index ratio were similar with the previous findings in literature (ICC ≥ 0.94; CV ≤ 2.8%; SEM ≤ 12.28; SRD% ≤ 7.7%. New generation power indices such as peak power, average power, lowest power, power drop, fatigue index, power decline, maximum speed as rpm, and amount of total energy expenditure demonstrated high reliability (ICC ≥ 0.94; CV ≤ 4.3%; SEM ≤ 10.36; SRD% ≤ 8.8%. Time to peak power, time at maximum speed, and power at maximum speed showed a moderate level of reliability (ICC ≥ 0.73; CV ≤ 8.9%; SEM ≤ 63.01; SRD% ≤ 22.4%. The results of this study indicate that reliability correlations and SRD% of new generation power and fatigue-related indices are similar with traditional 5-s means. However, new time-related indices are very sensitive and moderately reliable.

  18. Test Report : GS Battery, EPC power HES RESCU

    Energy Technology Data Exchange (ETDEWEB)

    Rose, David Martin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schenkman, Benjamin L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Borneo, Daniel R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2013-10-01

    The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratories (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprising of lead acid, lithium-ion or zinc-bromide. GS Battery and EPC Power have developed an energy storage system that utilizes zinc-bromide flow batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the GS Battery, EPC Power HES RESCU.

  19. Low-Power Built-In Self-Test Techniques for Embedded SRAMs

    Directory of Open Access Journals (Sweden)

    Shyue-Kung Lu

    2007-01-01

    Full Text Available The severity of power consumption during parallel BIST of embedded memory cores is growing significantly. In order to alleviate this problem, a row bank-based precharge technique based on the divided wordline (DWL architecture is proposed for low-power testing of embedded SRAMs. The memory cell array is first divided into row banks. The effectiveness of the row bank-based precharge technique is due to the predictable address sequence during test. In low-power test mode, instead of precharging the entire memory array, only the current accessed row bank is precharged. This will result in significant power saving for the precharge circuitry. The precharge power can be reduced to 1/b of that of the traditional precharge techniques, where b denotes the number of row banks in the memory array. With simple transmission gates and inverters, the modified precharge control circuitry was also designed. The hardware overhead for implementing the low-power technique is almost negligible. Moreover, the corresponding BIST design to implement the low-power technique is almost the same as the conventional BIST designs. It is also notable that the inherent low-power characteristics of the DWL architecture can be preserved. According to experimental results, 48.9% power reduction can be achieved for a 256 × 256 bit-oriented SRAM. The memory is divided into 8 row banks. Moreover, if the number of row banks increases, the power saving will also increase.

  20. Program plan for the Brayton Isotope Power System. Phase I. Design, fabrication and test of the Brayton Isotope Power System

    International Nuclear Information System (INIS)

    1975-01-01

    Phase I of an overall program for the development of a 500 to 2000 W(e) (EOM), 7-y life, power system for space vehicles is discussed. The system uses a closed Brayton dynamic system to convert energy from an isotope heat source at a net efficiency greater than 25 percent. This first phase, a 35-month effort, is for the conceptual design of a 1300 W(e), 450 lb flight system and the design, fabrication, and test of a ground demonstration system. The flight system will use, for the baseline design, two of the multihundred-watt (MHW) heat sources being developed. The Ground Demonstration System will simulate, as closely as possible, the Brayton Isotope Power Flight System and will utilize components and technology being developed for the Mini-Brayton rotating unit, recuperator and heat source assembly, respectively. The Ground Demonstration System includes a performance test and a 1000-h endurance test

  1. High-power circulator test results at 350 and 700 MHz

    International Nuclear Information System (INIS)

    Roybal, W.; Bradley, J.T.; Rees, D.E.

    2000-01-01

    The high-power RF systems for the Accelerator Production of Tritium (APT) program require high-power circulators at 350 MHz and 700 MHz to protect 1 MW Continuous Wave (CW) klystrons from reflected power. The 350 MHz circulator is based on the CERN, EXF, and APS designs and has performed very well. The 700 MHz circulator is a new design. Prototype 700 MHz circulators have been high-power tested at Los Alamos National Laboratory (LANL). The first of these circulators has satisfied performance requirements. The circulator requirements, results from the testing, and lessons learned from this development are presented and discussed

  2. Automatic testing technologies for I and C systems for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshida, Motoko; Sugio, Takayuki; Konishi, Tadao

    2014-01-01

    With the aim of enhancing the global competitiveness of instrumentation and control (I and C) systems for nuclear power plants, Toshiba has been making efforts to reduce the worker hours required for the testing of such systems and improve the quality of the tests. Display screen tests, which include many routine, repetitive tests and manual tests requiring a large number of operators to monitor multiple screen displays of the I and C system, are an essential element of the testing process. The introduction of automatic testing technologies is expected to substantially improve the efficiency of such display screen tests. We have now developed automatic testing technologies for display screen tests that can be applied without the need to change the I and C system. These technologies contribute to both the reduction of worker hours for testing and improvement of the quality of the tests. (author)

  3. Characterization of a Power Electronic Grid Simulator for Wind Turbine Generator Compliance Testing

    DEFF Research Database (Denmark)

    Glasdam, Jakob Bærholm; Gevorgian, V.; Wallen, R.

    2014-01-01

    This paper presents the commissioning results and testing capabilities of a multi-megawatt power electronic grid simulator situated in National Renewable Energy Laboratory’s (NREL’s) new testing facility. The commissioning is done using a commercial type 4 multi-megawatt sized wind turbine...... generator (WTG) installed in NREL’s new 5 MW dynamometer and a kilowatt sized type 1 WTG connected to the existing 2.5 MW dynamometer at NREL. The paper demonstrates the outstanding testing capability of the grid simulator and its application in the grid code compliance evaluation of WTGs including balanced...

  4. Testing for purchasing power parity in 21 African countries using several unit root tests

    Science.gov (United States)

    Choji, Niri Martha; Sek, Siok Kun

    2017-04-01

    Purchasing power parity is used as a basis for international income and expenditure comparison through the exchange rate theory. However, empirical studies show disagreement on the validity of PPP. In this paper, we conduct the testing on the validity of PPP using panel data approach. We apply seven different panel unit root tests to test the validity of the purchasing power parity (PPP) hypothesis based on the quarterly data on real effective exchange rate for 21 African countries from the period 1971: Q1-2012: Q4. All the results of the seven tests rejected the hypothesis of stationarity meaning that absolute PPP does not hold in those African Countries. This result confirmed the claim from previous studies that standard panel unit tests fail to support the PPP hypothesis.

  5. Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    Science.gov (United States)

    Dugala, Gina M.; Taylor, Linda M.; Kussmaul, Michael; Casciani, Michael; Brown, Gregory; Wiser, Joel

    2017-01-01

    Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical

  6. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  7. Gingin High Optical Power Test Facility

    International Nuclear Information System (INIS)

    Zhao, C; Blair, D G; Barrigo, P

    2006-01-01

    The Australian Consortium for Gravitational Wave Astronomy (ACIGA) in collaboration with LIGO is developing a high optical power research facility at the AIGO site, Gingin, Western Australia. Research at the facility will provide solutions to the problems that advanced gravitational wave detectors will encounter with extremely high optical power. The problems include thermal lensing and parametric instabilities. This article will present the status of the facility and the plan for the future experiments

  8. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  9. OOK power model based dynamic error testing for smart electricity meter

    International Nuclear Information System (INIS)

    Wang, Xuewei; Chen, Jingxia; Jia, Xiaolu; Zhu, Meng; Yuan, Ruiming; Jiang, Zhenyu

    2017-01-01

    This paper formulates the dynamic error testing problem for a smart meter, with consideration and investigation of both the testing signal and the dynamic error testing method. To solve the dynamic error testing problems, the paper establishes an on-off-keying (OOK) testing dynamic current model and an OOK testing dynamic load energy (TDLE) model. Then two types of TDLE sequences and three modes of OOK testing dynamic power are proposed. In addition, a novel algorithm, which helps to solve the problem of dynamic electric energy measurement’s traceability, is derived for dynamic errors. Based on the above researches, OOK TDLE sequence generation equipment is developed and a dynamic error testing system is constructed. Using the testing system, five kinds of meters were tested in the three dynamic power modes. The test results show that the dynamic error is closely related to dynamic power mode and the measurement uncertainty is 0.38%. (paper)

  10. OOK power model based dynamic error testing for smart electricity meter

    Science.gov (United States)

    Wang, Xuewei; Chen, Jingxia; Yuan, Ruiming; Jia, Xiaolu; Zhu, Meng; Jiang, Zhenyu

    2017-02-01

    This paper formulates the dynamic error testing problem for a smart meter, with consideration and investigation of both the testing signal and the dynamic error testing method. To solve the dynamic error testing problems, the paper establishes an on-off-keying (OOK) testing dynamic current model and an OOK testing dynamic load energy (TDLE) model. Then two types of TDLE sequences and three modes of OOK testing dynamic power are proposed. In addition, a novel algorithm, which helps to solve the problem of dynamic electric energy measurement’s traceability, is derived for dynamic errors. Based on the above researches, OOK TDLE sequence generation equipment is developed and a dynamic error testing system is constructed. Using the testing system, five kinds of meters were tested in the three dynamic power modes. The test results show that the dynamic error is closely related to dynamic power mode and the measurement uncertainty is 0.38%.

  11. High power RF performance test of an improved SiC load

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, W.H.; Kim, S.H.; Park, Y.J. [Pohang Accelerator Lab., Pohang Inst. of Sceince and Technology, Pohang (KR)] [and others

    1998-11-01

    Two prototypes of SiC loads sustaining a maximum peak power of 50 MW were fabricated by Nihon Koshuha Co. in Japan. The PAL conducted the high power RF performance tests of SiC loads to verify the operation characteristics for the application to the PLS Linac. The in-situ facility for the K 12 module was used for the test, which consists of a modulator and klystron system, waveguide network, vacuum and cooling system, and RF analyzing equipment. As the test results, no breakdown appeared up to 50 MW peak power of 1 {mu}s pulse width at a repetition rate of 50 Hz. However, as the peak power increased above 20 MW at 4 {mu}s with 10 Hz, the breakdown phenomena has been observed. Analysing the test results with the current operation power level of PLS Linac, it is confirmed that the SiC loads well satisfy the criteria of the PLS Linac operation. (author)

  12. Modeling of the dynamics of wind to power conversion including high wind speed behavior

    DEFF Research Database (Denmark)

    Litong-Palima, Marisciel; Bjerge, Martin Huus; Cutululis, Nicolaos Antonio

    2016-01-01

    This paper proposes and validates an efficient, generic and computationally simple dynamic model for the conversion of the wind speed at hub height into the electrical power by a wind turbine. This proposed wind turbine model was developed as a first step to simulate wind power time series...... for power system studies. This paper focuses on describing and validating the single wind turbine model, and is therefore neither describing wind speed modeling nor aggregation of contributions from a whole wind farm or a power system area. The state-of-the-art is to use static power curves for the purpose...... of power system studies, but the idea of the proposed wind turbine model is to include the main dynamic effects in order to have a better representation of the fluctuations in the output power and of the fast power ramping especially because of high wind speed shutdowns of the wind turbine. The high wind...

  13. Data on loss of off-site electric power simulation tests of the high temperature engineering test reactor

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Nakagawa, Shigeaki; Fujimoto, Nozomu; Tachibana, Yukio; Iyoku, Tatsuo

    2002-07-01

    The high temperature engineering test reactor (HTTR), the first high temperature gas-cooled reactor (HTGR) in Japan, achieved the first full power of 30 MW on December 7 in 2001. In the rise-to-power test of the HTTR, simulation tests on loss of off-site electric power from 15 and 30 MW operations were carried out by manual shutdown of off-site electric power. Because helium circulators and water pumps coasted down immediately after the loss of off-site electric power, flow rates of helium and water decreased to the scram points. To shut down the reactor safely, the subcriticality should be kept by the insertion of control rods and the auxiliary cooling system should cool the core continuously avoiding excessive cold shock to core graphite components. About 50 s later from the loss of off-site electric power, the auxiliary cooling system started up by supplying electricity from emergency power feeders. Temperature of hot plenum block among core graphite structures decreased continuously after the startup of the auxiliary cooling system. This report describes sequences of dynamic components and transient behaviors of the reactor and its cooling system during the simulation tests from 15 and 30 MW operations. (author)

  14. Reprodutibilidade inter e intradias do Power Control em um teste de potência muscular Reproducibilidad inter e intradías de Power Control en un test de potencia muscular Inter and intradays reproducibility of Power Control in test of muscle power

    Directory of Open Access Journals (Sweden)

    Fabrício Miranda Ribeiro

    2006-10-01

    Full Text Available O objetivo do presente estudo foi determinar a reprodutibilidade de um instrumento de medida da potência muscular (PM, o Power Control TechnoGym@, através de um teste de PM. Foram avaliadas 15 mulheres (26,2 ± 1,9 anos experientes em treinamento de força em dois exercícios, a remada sentada e a puxada aberta pela frente no pulley alto, através do teste de 1RM. Foram determinadas a carga máxima e a carga que gerou a potência máxima em cada exercício. Após a obtenção da carga que gerou potência máxima, os indivíduos passaram por três dias de testes em que se buscou verificar a reprodutibilidade inter e intradias das potências geradas. Utilizou-se a ANOVA para medidas repetidas na comparação dos resultados da PM para a carga individualizada e o post-hoc de Bonferroni para especificar quais medidas diferiam entre si, com o nível de significância adotado de 5%. Não foram encontradas diferenças significativas entre as medidas inter e intradias, respectivamente, na remada sentada (p = 0,991; p = 1,000 e puxada aberta pela frente no pulley alto (p = 0,607; p = 1,000. Pode-se verificar que, para um simples teste de PM, o Power Control TechnoGym@ apresenta-se como um instrumento útil e fidedigno na utilização de cargas na PM.El objetivo del presente estudio ha sido el de determinar la reproducibilidad de un instrumento de medida da potencia muscular (PM, Power Control TechnoGym@, a través de un test de PM. Fueron evaluadas 15 mujeres (26,2 ± 1,9 anos con experiencia en entrenamiento de fuerza en dos ejercicios, remo y tirón abierto por delante en el pulley alto, a través del test de 1RM. Fueron determinadas la carga máxima, y la carga que generó la potencia máxima en cada ejercicio. Después de obtener la carga que generó potencia máxima, los individuos pasaron por tres días de tests donde se buscó verificar la reproducibilidad inter e intradías de las potencias generadas. Se utilizó ANOVA para medidas repetidas en

  15. Including test errors in evaluating surveillance test intervals

    International Nuclear Information System (INIS)

    Kim, I.S.; Samanta, P.K.; Martorell, S.; Vesely, W.E.

    1991-01-01

    Technical Specifications require surveillance testing to assure that the standby systems important to safety will start and perform their intended functions in the event of plant abnormality. However, as evidenced by operating experience, the surveillance tests may be adversely impact safety because of their undesirable side effects, such as initiation of plant transients during testing or wearing-out of safety systems due to testing. This paper first defines the concerns, i.e., the potential adverse effects of surveillance testing, from a risk perspective. Then, we present a methodology to evaluate the risk impact of those adverse effects, focusing on two important kinds of adverse impacts of surveillance testing: (1) risk impact of test-caused trips and (2) risk impact of test-caused equipment wear. The quantitative risk methodology is demonstrated with several surveillance tests conducted at boiling water reactors, such as the tests of the main steam isolation valves, the turbine overspeed protection system, and the emergency diesel generators. We present the results of the risk-effectiveness evaluation of surveillance test intervals, which compares the adverse risk impact with the beneficial risk impact of testing from potential failure detection, along with insights from sensitivity studies

  16. The combined use of test reactor experiments and power reactor tests for the development of PCI-resistant fuel

    International Nuclear Information System (INIS)

    Junkrans, S.; Vesterlund, G.; Vaernild, O.

    1980-01-01

    The theme of this paper is that for development of PCI-resistant fuel acceptable from the commercial and licensing aspects, extensive and time-consuming work is needed both in a test reactor and in power reactors. The test reactor is necessary for ramp testing to power levels not allowed in power reactors and with the aim of generating fuel failures. It is also used for other special irradiation experiments. The access to power reactors is necessary to generate information on performance in a real LWR core and to incubate at a reasonable cost the large amount of rods required for test reactor ramping. Selected results from the ASEA-ATOM work are used to support these conclusions. (author)

  17. Validity and Reliability of a Medicine Ball Explosive Power Test.

    Science.gov (United States)

    Stockbrugger, Barry A.; Haennel, Robert G.

    2001-01-01

    Evaluated the validity and reliability of a medicine ball throw test to evaluate explosive power. Data on competitive sand volleyball players who performed a medicine ball throw and a standard countermovement jump indicated that the medicine ball throw test was a valid and reliable way to assess explosive power for an analogous total-body movement…

  18. Graphical Tests for Power Comparison of Competing Designs.

    Science.gov (United States)

    Hofmann, H; Follett, L; Majumder, M; Cook, D

    2012-12-01

    Lineups have been established as tools for visual testing similar to standard statistical inference tests, allowing us to evaluate the validity of graphical findings in an objective manner. In simulation studies lineups have been shown as being efficient: the power of visual tests is comparable to classical tests while being much less stringent in terms of distributional assumptions made. This makes lineups versatile, yet powerful, tools in situations where conditions for regular statistical tests are not or cannot be met. In this paper we introduce lineups as a tool for evaluating the power of competing graphical designs. We highlight some of the theoretical properties and then show results from two studies evaluating competing designs: both studies are designed to go to the limits of our perceptual abilities to highlight differences between designs. We use both accuracy and speed of evaluation as measures of a successful design. The first study compares the choice of coordinate system: polar versus cartesian coordinates. The results show strong support in favor of cartesian coordinates in finding fast and accurate answers to spotting patterns. The second study is aimed at finding shift differences between distributions. Both studies are motivated by data problems that we have recently encountered, and explore using simulated data to evaluate the plot designs under controlled conditions. Amazon Mechanical Turk (MTurk) is used to conduct the studies. The lineups provide an effective mechanism for objectively evaluating plot designs.

  19. Using the noninformative families in family-based association tests : A powerful new testing strategy

    NARCIS (Netherlands)

    Lange, C; DeMeo, D; Silverman, EK; Weiss, ST; Laird, NM

    2003-01-01

    For genetic association studies with multiple phenotypes, we propose a new strategy for multiple testing with family-based association tests (FBATs). The strategy increases the power by both using all available family data and reducing the number of hypotheses tested while being robust against

  20. Extended Pulse-Powered Humidity-Freeze Cycling for Testing Module-Level Power Electronics

    Energy Technology Data Exchange (ETDEWEB)

    Hacke, Peter L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rodriguez, Miguel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kempe, Michael D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Repins, Ingrid L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-28

    An EMI suppression capacitor (polypropylene film type) failed by 'popcorning' due to vapor outgassing in pulse powered humidity-freeze cycles. No shorts or shunts could be detected despite mildly corroded metallization visible in the failed capacitor. Humidity-freeze cycling is optimized to break into moisture barriers. However, further studies will be required on additional module level power electronic (MLPE) devices to optimize the stress testing for condensation to precipitate any weakness to short circuiting and other humidity/bias failure modes.

  1. Material shielding of power frequency magnetic fields: Research and testing results from the EPRI Power Delivery Center-Lenox. Final report

    International Nuclear Information System (INIS)

    Anderson, C.B.

    1998-06-01

    Extensive investigations of a variety of material shielding methods have been performed at the EPRI Power Delivery Center--Lenox, Massachusetts. This work is part of a larger shielding investigation being done for EPRI by Electric Research and Management, Inc. (ERM) as part of the Magnetic Field Management Target in the EPRI Environment Group. Part of this work, involving cylinders of material, is to be included in a shielding handbook being prepared by ERM. Material shielding tests, not included in the handbook, as well as additional material shielding research, including testing, analyses, and computer simulations performed at the EPRI Power Delivery Center--Lenox are documented here. One of the major complications of using materials to shield magnetic fields is the mathematical complexity of the phenomenon involved. The result is that analytical solutions exist only for a very small number of simple geometries such as spheres, infinitely long cylinders, and infinite sheets. In practice, the materials typically come in the form of sheets. At present, there are no analytical methods for directly determining the shielding effectiveness of finite sheets of material, however, EPRI is sponsoring work in this area. There are some methods based on conformal mapping which can provide a solution for simple two-dimensional sheets. While such methods are useful in gaining insight into the mechanisms of shielding, they are not realistic enough to provide accurate shielding estimates. Empirical techniques are still required to determine the shielding effectiveness of material sheets. The material shielding tests and computer simulations are described in the report. The results of these tests and simulations have been used to develop a number of material shielding design rules for use in practical applications

  2. Power-hardware-in-the-loop test of VSC-HVDC connection for off-shore wind power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Ranjan [Siemens Wind Power A/S, Brande (Denmark); Technical Univ. of Denmark (Denmark). Center for Electric Technology; Cha, Seung T.; Wu, Qiuwei; Rasmussen, Tonny W.; Oestergaard, Jacob [Technical Univ. of Denmark (Denmark). Center for Electric Technology; Jensen, Kim H. [Siemens Wind Power A/S, Brande (Denmark)

    2011-07-01

    This paper present a power-hardware-in-the-loop (PHIL) test of an off-shore wind power plant (WPP) interconnected to the on-shore grid via a VSC-HVDC connection. The intention of the PHIL test is to verify the hardware interaction and the control co-ordination between the plant side VSC of the HVDC system and the wind turbines within the WPP in order to ensure smooth operation of the WPP under both normal and fault operating condition. The PHIL test platform is comprised of a real time digital simulator (RTDS), a Spitzenberger Spies three phase 7,5 kW power amplifier, a purpose built VSC and a DC chopper. The WPP is simulated in the RTDS as a single full-scale wind turbine. The simulated WPP interacts with the WPP side VSC through the power amplifier. The interface between the RTDS and the power amplifier is done via an analogue GTAO I/O card of the RTDS and the input channel of the amplifier. The amplifier scales up the voltages at the point of connection of the WPP in the RTDS to the voltage level for the WPP side VSC. The WPP side VSC converter is equipped with a DC chopper. The test results show the successful control coordination between the WPP and the plant side VSC converter of the HVDC connection of the WPP. (orig.)

  3. Experiences with drug testing at a nuclear power plant

    International Nuclear Information System (INIS)

    Ray, H.B.

    1987-01-01

    After more than 2 yr of operation of a drug testing program at the San Onofre nuclear power plant site, the Southern California Edison Co. has had a number of experiences and lessons considered valuable. The drug testing program at San Onofre, implemented in September of 1984, continues in essentially the same form today. Prior to describing the program, the paper reviews several underlying issues that believed to be simultaneously satisfied by the program: trustworthiness, fitness and safety, public trust, and privacy and search. The overall drug testing program, periodic drug monitoring program, and unannounced drug testing program are described. In addition to the obvious features of a good drug testing program, which are described in the EEI guide, it is essential to consider such issues as the stated program rationale, employee relations, and disciplinary action measures when contemplating or engaging in drug testing at nuclear power plants

  4. Statistical testing and power analysis for brain-wide association study.

    Science.gov (United States)

    Gong, Weikang; Wan, Lin; Lu, Wenlian; Ma, Liang; Cheng, Fan; Cheng, Wei; Grünewald, Stefan; Feng, Jianfeng

    2018-04-05

    The identification of connexel-wise associations, which involves examining functional connectivities between pairwise voxels across the whole brain, is both statistically and computationally challenging. Although such a connexel-wise methodology has recently been adopted by brain-wide association studies (BWAS) to identify connectivity changes in several mental disorders, such as schizophrenia, autism and depression, the multiple correction and power analysis methods designed specifically for connexel-wise analysis are still lacking. Therefore, we herein report the development of a rigorous statistical framework for connexel-wise significance testing based on the Gaussian random field theory. It includes controlling the family-wise error rate (FWER) of multiple hypothesis testings using topological inference methods, and calculating power and sample size for a connexel-wise study. Our theoretical framework can control the false-positive rate accurately, as validated empirically using two resting-state fMRI datasets. Compared with Bonferroni correction and false discovery rate (FDR), it can reduce false-positive rate and increase statistical power by appropriately utilizing the spatial information of fMRI data. Importantly, our method bypasses the need of non-parametric permutation to correct for multiple comparison, thus, it can efficiently tackle large datasets with high resolution fMRI images. The utility of our method is shown in a case-control study. Our approach can identify altered functional connectivities in a major depression disorder dataset, whereas existing methods fail. A software package is available at https://github.com/weikanggong/BWAS. Copyright © 2018 Elsevier B.V. All rights reserved.

  5. On the Existence of Uniformly Most Powerful Bayesian Tests With Application to Non-Central Chi-Squared Tests

    OpenAIRE

    Nikooienejad, Amir; Johnson, Valen E.

    2018-01-01

    Uniformly most powerful Bayesian tests (UMPBTs) are an objective class of Bayesian hypothesis tests that can be considered the Bayesian counterpart of classical uniformly most powerful tests. Unfortunately, UMPBTs have only been exposed for application in one parameter exponential family models. The purpose of this article is to describe methodology for deriving UMPBTs for a larger class of tests. Specifically, we introduce sufficient conditions for the existence of UMPBTs and propose a unifi...

  6. Stress test of the nuclear power plants performed in Taiwan

    International Nuclear Information System (INIS)

    Wu, C.H.; Teng, W.C.; Chang, S.; Chen, Y.B.

    2014-01-01

    In the wake of Japan's Fukushima Daiichi Nuclear Power Plants event, the Atomic Energy Council (AEC) has asked Taiwan's Nuclear Power Plant operator (TPC) to re-examine and re-evaluate the vulnerabilities of its nuclear units, and furthermore, take possible countermeasures against extreme natural disasters, including earthquake, tsunami and rock-and-mud slide. The evaluation process should be based on both within and beyond Design Basis Accidents, by reference to the actions recommended by the world nuclear authorities and groups, namely, IAEA, USNRC, NEI, ENSREG and WANO. Taiwan is a very densely populated region of the world. Furthermore, like Japan, due to its geophysical position, Taiwan is prone to large scale earthquakes, and although historically rare, Taiwan also faces the potential risk of tsunamis. AEC also asked TPC to perform the stress test following the specification given by WENRA (later ENSREG) and conducted in all the EU's nuclear reactors. After completion of the stress test for all the nuclear power plants, AEC was trying to have the reports peer reviewed by international organizations, as EU did. The OECD/NEA accepted AEC's request and formed a review team specific to the review of Taiwan's National Report for the Stress Test. There were 18 follow-up items after the NEA's review. Based on these items, AEC developed five orders to require TPC further enhancing their capabilities to cope with extreme natural hazards. The ENSREG also formed a nine-expert review team for Taiwan's Stress Test in response to AEC's request almost at the same time as the OECD/NEA. The ENSREG review team began their works in June 2013 by desktop review, and ended in early October 2013 by country visit to Taiwan. While the assessment of post-Fukushima evaluation reveals neither immediate nuclear safety concerns nor threats to the public health and safety, AEC requested that TPC focus on strengthening its re-evaluation on design

  7. Stress test of the nuclear power plants performed in Taiwan

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C.H.; Teng, W.C.; Chang, S.; Chen, Y.B. [Atomic Energy Council, Taipei, Taiwan (China)

    2014-07-01

    In the wake of Japan's Fukushima Daiichi Nuclear Power Plants event, the Atomic Energy Council (AEC) has asked Taiwan's Nuclear Power Plant operator (TPC) to re-examine and re-evaluate the vulnerabilities of its nuclear units, and furthermore, take possible countermeasures against extreme natural disasters, including earthquake, tsunami and rock-and-mud slide. The evaluation process should be based on both within and beyond Design Basis Accidents, by reference to the actions recommended by the world nuclear authorities and groups, namely, IAEA, USNRC, NEI, ENSREG and WANO. Taiwan is a very densely populated region of the world. Furthermore, like Japan, due to its geophysical position, Taiwan is prone to large scale earthquakes, and although historically rare, Taiwan also faces the potential risk of tsunamis. AEC also asked TPC to perform the stress test following the specification given by WENRA (later ENSREG) and conducted in all the EU's nuclear reactors. After completion of the stress test for all the nuclear power plants, AEC was trying to have the reports peer reviewed by international organizations, as EU did. The OECD/NEA accepted AEC's request and formed a review team specific to the review of Taiwan's National Report for the Stress Test. There were 18 follow-up items after the NEA's review. Based on these items, AEC developed five orders to require TPC further enhancing their capabilities to cope with extreme natural hazards. The ENSREG also formed a nine-expert review team for Taiwan's Stress Test in response to AEC's request almost at the same time as the OECD/NEA. The ENSREG review team began their works in June 2013 by desktop review, and ended in early October 2013 by country visit to Taiwan. While the assessment of post-Fukushima evaluation reveals neither immediate nuclear safety concerns nor threats to the public health and safety, AEC requested that TPC focus on strengthening its re-evaluation on design

  8. Purchasing Power Parity : Evidence from a New Test

    NARCIS (Netherlands)

    Klaassen, F.J.G.M.

    1999-01-01

    Most economists intuitively consider purchasing power parity (PPP) to be true. Nevertheless, quite surprisingly, the empirical literature is not very supportive for PPP. In this paper, however, we find evidence in favor of PPP using a new test. The test is embedded in a Markov regime-switching model

  9. Estimation of sample size and testing power (Part 4).

    Science.gov (United States)

    Hu, Liang-ping; Bao, Xiao-lei; Guan, Xue; Zhou, Shi-guo

    2012-01-01

    Sample size estimation is necessary for any experimental or survey research. An appropriate estimation of sample size based on known information and statistical knowledge is of great significance. This article introduces methods of sample size estimation of difference test for data with the design of one factor with two levels, including sample size estimation formulas and realization based on the formulas and the POWER procedure of SAS software for quantitative data and qualitative data with the design of one factor with two levels. In addition, this article presents examples for analysis, which will play a leading role for researchers to implement the repetition principle during the research design phase.

  10. Evaluation of power control concepts using the PMAD systems test bed. [Power Management and Distribution

    Science.gov (United States)

    Beach, R. F.; Kimnach, G. L.; Jett, T. A.; Trash, L. M.

    1989-01-01

    The Lewis Research Center's Power Management and Distribution (PMAD) System testbed and its use in the evaluation of control concepts applicable to the NASA Space Station Freedom electric power system (EPS) are described. The facility was constructed to allow testing of control hardware and software in an environment functionally similar to the space station electric power system. Control hardware and software have been developed to allow operation of the testbed power system in a manner similar to a supervisory control and data acquisition (SCADA) system employed by utility power systems for control. The system hardware and software are described.

  11. Nuclear power plant Olkiluoto 3. Containment leakage test under extreme conditions

    Energy Technology Data Exchange (ETDEWEB)

    Fleckenstein, Tobias [TUEV SUED Industrie Service GmbH, Munich (Germany). Measaruement Technology Dept.

    2015-01-15

    Modern nuclear power plants place high demands on the design and execution of safety checks. TUEV SUED supported the containment leakage test for the largest- capacity third generation nuclear power plant in the world - Olkiluoto 3 in Finland. The experts successfully met the challenges presented by exceptional parameters of the project. The containment of Olkiluoto 3 is unique in that the vessel's volume is 80,000 m{sup 3} while measurements were carried out over a period of ten days. To execute the test, 75 temperature and 15 humidity sensors had to be installed and correctly interlinked by more than ten kilometres of cable. These instruments also needed to withstand an absolute pressure of 6 bar, ambient temperatures of 30 C and high levels of humidity. These conditions required comprehensive preparation and a high amount of qualification tests. Parts of the qualifications were carried out at the autoclave system of the Technical University in Munich, Germany, where the project test conditions could be simulated. The software required to determine the tests was developed by TUEV SUED and verified by German's national accreditation body DAkkS under ISO 17025. TUEV SUED enabled the test schedule to continue without delay by analysing all recorded data continuously on site, including pressure, temperature, humidity and leakage mass flow curves. With the comprehensive preparation, data acquisition system recording measurements continuously and the on-time result calculation, all components of the leak-tightness assessment were successfully completed in accordance with requirements.

  12. PIE of test assembly of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Ran, M.; Yan, J.; Wang, S.

    2000-01-01

    The small dimensional test fuel assembly (3x3-2) for the Qinshan Nuclear Power Plant was irradiated up to 25.7 Gwd/tU in the in-pile loop (15.5 Mpa,320 C) in Heavy Water Research Reactor (HWRR), CIAE, at simulative condition to Qinshan PWR normal and short time overpower operation for verifying the design, technology, and material properties of the fuel assembly. Comprehensive post-irradiation examination (PIE) including dimension measurement, gamma scanning, eddy current test, X ray, radiography, measurement of fission gas release, and quantitative metallography etc. were performed. PIE results show that the diameter of the fuel rods changed, ridges appeared on the cladding, pellets swelled, and the rate of fission gas release was higher than what we expected. The results would be an important basis for further improvement of design, technology and material properties for Qinshan PWR assembly. (author)

  13. United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

    Energy Technology Data Exchange (ETDEWEB)

    Hack, Horst [Electric Power Research Institute (EPRI); Purgert, Robert Michael [Energy Industries of Ohio

    2017-12-13

    Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO2 emissions, compared to CO2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760

  14. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    International Nuclear Information System (INIS)

    Bigi, Marco; Rinaldi, Luigi; Simon, Muriel; Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino; Decamps, Hans; Luchetta, Adriano; Meddour, Abdelraouf; Moressa, Modesto; Morri, Cristiano; Musile Tanzi, Antonio; Recchia, Mauro; Wagner, Uwe; Zamengo, Andrea; Toigo, Vanni

    2015-01-01

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m"2 Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  15. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    Energy Technology Data Exchange (ETDEWEB)

    Bigi, Marco, E-mail: marco.bigi@igi.cnr.it [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Rinaldi, Luigi [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Simon, Muriel [Fusion for Energy, Josep Pla 2, 08019 Barcelona (Spain); Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Decamps, Hans [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France); Luchetta, Adriano [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Meddour, Abdelraouf [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Moressa, Modesto [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Morri, Cristiano; Musile Tanzi, Antonio [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Recchia, Mauro [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Wagner, Uwe [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Zamengo, Andrea; Toigo, Vanni [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy)

    2015-10-15

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m{sup 2} Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  16. High power tests of X-band RF windows at KEK

    Energy Technology Data Exchange (ETDEWEB)

    Otake, Yuji [Earthquake Research Inst., Tokyo Univ., Tokyo (Japan); Tokumoto, Shuichi; Kazakov, Sergei Yu.; Odagiri, Junichi; Mizuno, Hajime

    1997-04-01

    Various RF windows comprising a short pill-box, a long pill-box, a TW (traveling wave)-mode and three TE11-mode horn types have been developed for an X-band high-power pulse klystron with two output windows for JLC (Japan Linear Collider). The output RF power of the klystron is designed to be 130 MW with the 800 ns pulse duration. Since this X-band klystron has two output windows, the maximum RF power of the window must be over 85 MW. The design principle for the windows is to reduce the RF-power density and/or the electric-field strength at the ceramic part compared with that of an ordinary pill-box-type window. Their reduction is effective to increase the handling RF power of the window. To confirm that the difference among the electric-field strengths depends on their RF structures, High-power tests of the above-mentioned windows were successfully carried out using a traveling-wave resonator (TWR) for the horns and the TW-mode type and, installing them directly to klystron output waveguides for the short and long pill-box type. Based upon the operation experience of S-band windows, two kinds of ceramic materials were used for these tests. The TE11-mode 1/2{lambda}g-1 window was tested up to the RF peak-power of 84 MW with the 700 ns pulse duration in the TWR. (J.P.N)

  17. Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

    Science.gov (United States)

    Lebron, Ramon C.; Oliver, Angela C.; Bodi, Robert F.

    1991-01-01

    Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

  18. Application of MATLAB in testing digital power supply controllers

    International Nuclear Information System (INIS)

    Ke Xinhua; Chinese Academy of Sciences, Beijing; Lu Songlin; Shen Tianjian

    2008-01-01

    Based on introducing MATLAB SISOTOOL in MATLAB control box and the magnet power supply system in detail, this paper presented the application of MATLAB SISOTOOL in Testing Digital Power Supply controllers. This control tool should be popularized because of its characteristics of convenience and easy-to-use. (authors)

  19. Power Performance Test Report for the SWIFT Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza, I.; Hur, J.

    2012-12-01

    This report summarizes the results of a power performance test that NREL conducted on the SWIFT wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the SWIFT is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

  20. Mechanical design and fabrication of power feed cavity test setup

    International Nuclear Information System (INIS)

    Ghodke, S.R.; Dhavle, A.S.; Sharma, Vijay; Sarkar, Shreya; Kumar, Mahendra; Nayak, Susanta; Barnwal, Rajesh; Jayaprakash, D.; Mondal, J.; Nimje, V.T.; Mittal, K.C.; Gantayet, L.M.

    2013-01-01

    Power feed cavity set up consists of nine number of accelerating cavity and eight numbers of coupling cavity for testing of power feed cavity with coupling flange for 2856 MHz S band standing wave coupled cavity linac. When we are assembling the cavity and applying the pressure, its resonance frequency changes with applied pressure/load. After some critical pressure/load frequency change becomes negligible or zero. This set up will be used to find out assembly performance of power feed cavity and its coupler. Top four cavity or eight half cells as well as bottom four cavity or eight half cells will be brazed separately. Power feed cavity will be sandwiched between this two brazed cavity assemblies. This paper discuss about linear motion bush, linear motion rod, load cell, hydraulic actuator, power pack, stepper motor PLC control, jig boring, alignment, tolerances and assembly procedure for this test setup. (author)

  1. TRACKING TESTS FOR THE SNS FAST INJECTION BUMP POWER SUPPLY

    International Nuclear Information System (INIS)

    ENG, W.; CUTLER, R.; DEWAN, S.

    2004-01-01

    The tracking requirement of the SNS Fast Injection Bump power supplies is described. In addition to the usual tracking between the load current and the input reference of a power supply, these power supplies must also track between pairs of units under slightly different loads. This paper describes the use of a current-null test to measure tracking performances. For the actual tests, a single dummy magnet load was used to measure the tracking between the first two production units at the manufacturer's facility. Using the Yokogawa WE7000 waveform. PC-based measurement instrument, input and output waveforms are digitized and stored in data files. A program written for this application is then used to extract data from these files to construct, analyze the waveforms and characterize the power supply performance. Results of the measurements of two SNS Fast Injection Bump power supplies will be presented in this paper

  2. Tests Of A Stirling-Engine Power Converter

    Science.gov (United States)

    Dochat, George

    1995-01-01

    Report describes acceptance tests of power converter consisting of pair of opposed free-piston Stirling engines driving linear alternators. Stirling engines offer potential for extremely long life, high reliability, high efficiency at low hot-to-cold temperature ratios, and relatively low heater-head temperatures.

  3. Theoretical parameter histories of dynamic tests during power commissioning of Mochovce units power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Jagrik, J.; Mraz, M.; Rapant, M.; Stefanovic, P.; Kotasek, J.; Gieci, A.; Macko, J.; Mosny, J.

    1998-01-01

    Theoretical histories of selected parameters for dynamic tests carried out in the course of power commissioning of the Mochovce Unit 1 at the power level 100% N nom are shown in the report. The expected histories given were developed based on calculations performed by means of simulator in Nuclear Power Plants Research Institute Trnava, Inc., simulator in EGU Praha and simulator at the Mochovce plant, as well as based on similar tests at both Bohunice and Dukovany plants

  4. CHP in Switzerland from 1990 to 1998. Thermal power generation including combined heat and power

    International Nuclear Information System (INIS)

    Kaufmann, U.

    1999-01-01

    The results of a study on thermal power generation in Switzerland show that combined heat and power (CHP) systems have grown rapidly. Statistics are presented on the development of CHP-based power and also on thermal power stations without waste heat usage. Figures are given for gas and steam turbine installations, combined gas and steam turbine stations and motor-driven CHP units. Power production is categorised, separating small and large (over 1 Megawatt electrical) power generation facilities. On-site, distributed power generation at consumers' premises and the geographical distribution of plant is described

  5. A Panel Test of Purchasing Power Parity Under the Null of Stationarity

    OpenAIRE

    Hunter, J; Simpson, M

    2001-01-01

    Purchasing Power Parity (PPP) is tested using a sample of real exchange rate data for twelve European countries. Acknowledging that Augmented Dickey Fuller tests have low power, we apply a Panel test that considers the null of stationarity and corrects for serial dependence using a non-parametric kernel based method.

  6. 14 CFR 33.96 - Engine tests in auxiliary power unit (APU) mode.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine tests in auxiliary power unit (APU... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.96 Engine tests in auxiliary power unit (APU) mode. If the engine is designed with a propeller brake which...

  7. A robust mixed H2/H∞ based LFC of a deregulated power system including SMES

    International Nuclear Information System (INIS)

    Shayeghi, H.; Jalili, A.; Shayanfar, H.A.

    2008-01-01

    This paper presents a new robust decentralized controller based on mixed H 2 /H ∞ control technique for the solution of load frequency control (LFC) problem including superconducting magnetic energy storage (SMES) in a deregulated electricity environment. To achieve decentralization, in each control area, the connections between this area and the rest of the system and the effects of possible contracts are treated as a set of new disturbance signals. In order to minimize effects of load disturbances and to achieve desired level of robust performance in the presence of modeling uncertainties and practical constraints on control action the idea of mixed H 2 /H ∞ control technique is being used for the solution of LFC problem. This newly developed design strategy combines advantage of H 2 and H ∞ control syntheses and gives a powerful multi-objectives design addressed by the linear matrix inequalities (LMI) technique. To demonstrate the effectiveness of the proposed method a four-area restructured power system is considered as a test system under different operating conditions. The simulation results with the proposed controller are shown to maintain robust performance in the presence of SMES unit in two areas at power system and without SMES unit in any of the areas. Analysis reveals that the proposed control strategy with considering SMES unit improves significantly the dynamical performances of system such as settling time and overshoot against parametric uncertainties for a wide range of area load demands and disturbances in either of the areas even in the presence of system nonlinearities

  8. Micro-Combined Heat and Power Device Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NIST has developed a test facility for micro-combined heat and power (micro-CHP) devices to measure their performance over a range of different operating strategies...

  9. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-05-01

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants... entitled ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants'' is temporarily...

  10. Modeling a constant power load for nickel-hydrogen battery testing using SPICE

    Science.gov (United States)

    Bearden, Douglas B.; Lollar, Louis F.; Nelms, R. M.

    1990-01-01

    The effort to design and model a constant power load for the HST (Hubble Space Telescope) nickel-hydrogen battery tests is described. The constant power load was designed for three different simulations on the batteries: life cycling, reconditioning, and capacity testing. A dc-dc boost converter was designed to act as this constant power load. A boost converter design was chosen because of the low test battery voltage (4 to 6 VDC) generated and the relatively high power requirement of 60 to 70 W. The SPICE model was shown to consistently predict variations in the actual circuit as various designs were attempted. It is concluded that the confidence established in the SPICE model of the constant power load ensures its extensive utilization in future efforts to improve performance in the actual load circuit.

  11. Materials for the field test - students' attitudes to nuclear power stations

    International Nuclear Information System (INIS)

    Hoffmann, L.; Kattmann, U.; Lucht, H.; Spada, H.

    1975-01-01

    This working paper contains all the materials developed for and used in the field test of 'Student Attitudes toward Atomic Power Stations'. This research is a component of a larger project called 'Attitudes and Attitudes Change with Regard to Problems of Energy Supply and their Consequences for our Environment'. A central aim of this project is the development of instrumental strategies enabling the student to build up in this field a critically reflective and active behavior and attitudes based on sound problem consciousness. These instrumental strategies are derived from theories of social, learning and environmental psychology. A concrete result of these efforts are the materials of the field test mentioned above. They include: a) The draft of an instructional unit 'Atomic Power Stations - Prosperity or Disaster' with - a booklet on the subject matter for students and teachers - a paper on the contents of the instructional unit and their sequence - information for the students concerning the aims of the investigation - working materials for the students - reading materials for the teachers informing them about the proposed instructional strategies based on the psychological theories: (1) model-learning and the structuring of knowledge, (2) how to activate and motivate students, (3) the stabilization of attitudes and (4) small group work. b) Instruments for testing and observation. These instruments were used within a criterion-oriented evaluation and for a test of the effects of the different proposed items used in the instruction. (orig./HP) [de

  12. Towards a foundation for holistic power system validation and testing

    DEFF Research Database (Denmark)

    Blank, M.; Lehnhoff, S.; Heussen, Kai

    2016-01-01

    , and intelligent solutions for system operation have transformed the power system into a smart grid. To support the development process of smart grid solutions on system level they have to be tested in a holistic manner covering the multi-domain aspect of a such complex systems. This paper introduces the concept...... of holistic power system testing and discuss first steps towards a corresponding methodology that is being developed in the European ERIGrid research infrastructure project....

  13. Testing of a Stirling engine for heat + power cogeneration; Test eines Stirlingmotors zur Kraft-Waerme-Kopplung

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, M.; Heinen, J. [RWE Energy AG, Essen (Germany)

    2007-01-15

    As part of a technology evaluation of distributed energy generators, RWE Energy AG extensively tested a micro combined heat and power appliance, powered by a Stirling engine developed by the British firm Microgen Energy Limited. Microgen Energy Limited is a specialist in micro combined heat and power (microCHP) based on unique Free-Piston Stirling generator technology Microgen is working with leading appliance manufacturers to integrate its core technology into a range of innovative microCHP products. The investigations concentrated on the determination of capacity, efficiency and emissions, the grid connection and behaviour at start-up and under varying loads. This article summarises the results of the tests and gives an overview of micro-CHP technologies (CHP=combined heat and power) and their possible significance to the market in the future. (orig.)

  14. Dynamic testing of nuclear power plant structures: an evaluation

    International Nuclear Information System (INIS)

    Weaver, H.J.

    1980-02-01

    Lawrence Livermore Laboratory (LLL) evaluated the applications of system identification techniques to the dynamic testing of nuclear power plant structures and subsystems. These experimental techniques involve exciting a structure and measuring, digitizing, and processing the time-history motions that result. The data can be compared to parameters calculated using finite element or other models of the test systems to validate the model and to verify the seismic analysis. This report summarizes work in three main areas: (1) analytical qualification of a set of computer programs developed at LLL to extract model parameters from the time histories; (2) examination of the feasibility of safely exciting nuclear power plant structures and accurately recording the resulting time-history motions; (3) study of how the model parameters that are extracted from the data be used best to evaluate structural integrity and analyze nuclear power plants

  15. Environmental site assessments should include radon gas testing

    International Nuclear Information System (INIS)

    Nardi, M.A.

    1991-01-01

    There are two emerging influences that will require radon gas testing as part of many property transfers and most site assessments. These requirements come from lending regulators and state legislatures. Fannie Mae and others have developed environmental investigation guidelines for the purchase of environmentally contaminated real estate. These guidelines include radon gas testing for many properties. Several states have enacted laws that require environmental disclosure forms be prepared to ensure that the parties involved in certain real estate transactions are aware of the environmental liabilities that may come with the transfer of property. Indiana has recently enacted legislation that would require the disclosure of the presence of radon gas on many commercial real estate transactions. With more lenders and state governments likely to follow this trend, radon gas testing should be performed during all property transfers and site assessment to protect the parties involved from any legal liabilities

  16. High power tests of dressed supconducting 1.3 GHz RF cavities

    Energy Technology Data Exchange (ETDEWEB)

    Hocker, A.; Harms, E.R.; Lunin, A.; Sukhanov, A.; /Fermilab

    2011-03-01

    A single-cavity test cryostat is used to conduct pulsed high power RF tests of superconducting 1.3 GHz RF cavities at 2 K. The cavities under test are welded inside individual helium vessels and are outfitted ('dressed') with a fundamental power coupler, higher-order mode couplers, magnetic shielding, a blade tuner, and piezoelectric tuners. The cavity performance is evaluated in terms of accelerating gradient, unloaded quality factor, and field emission, and the functionality of the auxiliary components is verified. Test results from the first set of dressed cavities are presented here.

  17. Test report light duty utility arm power distribution system (PDS)

    International Nuclear Information System (INIS)

    Clark, D.A.

    1996-01-01

    The Light Duty Utility Arm (LDUA) Power Distribution System has completed vendor and post-delivery acceptance testing. The Power Distribution System has been found to be acceptable and is now ready for integration with the overall LDUA system

  18. Testing for cross-subsidisation in the combined heat and power generation sector

    DEFF Research Database (Denmark)

    Amundsen, Eirik S; Andersen, Per; Jensen, Frank

    2011-01-01

    In this paper we examine cross-subsidisation among combined heat and power producers in Denmark.Information on stand-alone costs for heat generation allows us to empirically compare the Faulhaber tests,tests with an upper bound on stand-alone costs (the Palmer tests) and the fully distributed cos...... test (FDC). All tests indicate a substantial amount of cross-subsidisation from heat generation to power generation. It is shown that the FDC test is closer to that of the Faulhaber tests in its results than the Palmer tests. Thus as the Faulhaber tests are considered in the literature...

  19. Implementation of an Electric Vehicle Test Bed Controlled by a Virtual Power Plant for Contributing to Regulating Power Reserves

    DEFF Research Database (Denmark)

    Marra, Francesco; Sacchetti, Dario; Pedersen, Anders Bro

    2012-01-01

    and communication interfaces, is able to respond in real-time to smart grid control signals. The EV test bed is equipped with a Lithium-ion battery pack, a Battery Management System (BMS), a charger and a Vehicle-to-Grid (V2G) unit for feeding power back to the grid. The designed solution serves......With the increased focus on Electric Vehicles (EV) research and the potential benefits they bring for smart grid applications, there is a growing need for an evaluation platform connected to the electricity grid. This paper addresses the design of an EV test bed, which using real EV components...... requests from the Danish TSO are used as a proof-of-concept, to demonstrate the EV test bed power response. Test results have proven the capability to respond to frequent power control requests and they reveal the potential EV ability for contributing to regulating power reserves....

  20. RELIABILITY OF THE ONE REPETITION-MAXIMUM POWER CLEAN TEST IN ADOLESCENT ATHLETES

    Science.gov (United States)

    Faigenbaum, Avery D.; McFarland, James E.; Herman, Robert; Naclerio, Fernando; Ratamess, Nicholas A.; Kang, Jie; Myer, Gregory D.

    2013-01-01

    Although the power clean test is routinely used to assess strength and power performance in adult athletes, the reliability of this measure in younger populations has not been examined. Therefore, the purpose of this study was to determine the reliability of the one repetition maximum (1 RM) power clean in adolescent athletes. Thirty-six male athletes (age 15.9 ± 1.1 yrs, body mass 79.1 ± 20.3 kg, height 175.1 ±7.4 cm) who had more than 1 year of training experience with weightlifting exercises performed a 1 RM power clean on two nonconsecutive days in the afternoon following standardized procedures. All test procedures were supervised by a senior level weightlifting coach and consisted of a systematic progression in test load until the maximum resistance that could be lifted for one repetition using proper exercise technique was determined. Data were analyzed using an intraclass correlation coefficient (ICC [2,k]), Pearson correlation coefficient (r), repeated measures ANOVA, Bland-Altman plot, and typical error analyses. Analysis of the data revealed that the test measures were highly reliable demonstrating a test-retest ICC of 0.98 (95% CI = 0.96–0.99). Testing also demonstrated a strong relationship between 1 RM measures on trial 1 and trial 2 (r=0.98, pinjuries occurred during the study period and the testing protocol was well-tolerated by all subjects. These findings indicate that 1 RM power clean testing has a high degree of reproducibility in trained male adolescent athletes when standardized testing procedures are followed and qualified instruction is present. PMID:22233786

  1. Reactor power cutback system test experience at YGN 4

    International Nuclear Information System (INIS)

    Chi, Sung Goo; Kim, Se Chang; Seo, Jong Tae; Eom, Young Meen; Wook, Jeong Dae; Choi, Young Boo

    1995-01-01

    YGN 3 and 4 are the nuclear power plants having System 80 characteristics with a rated thermal output of 2815 MWth and a nominal net electrical output of 1040 MWe. YGN 3 achieved commercial operation on March 31, 1995 and YGN 4 completed Power Ascension Test (PAT) at 20%, 50%, 80% and 100% power by September 23, 1995. YGN 3 and 4 design incorporates the Reactor POwer Cutback System (RPCS) which reduces plant trips caused by Loss of Load (LOL)/ Turbine Trip and Loss of One Main Feedwater Pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety systems. The RPCS is designed to rapidly reduce reactor power by dropping preselected Control Element Assemblies (CEAs) while other NSSS control systems maintain process parameters within acceptable ranges. Extensive RPCS related tests performed during the initial startup of YGN 4 demonstrated that the RPCS can maintain the reactor on-line without opening primary or secondary safety valves and without actuating the Engineered Safety Features Actuation System (ESFAS). It is expected that use of the RPCS at YGN will increase the overall availability of the units and reduce the number of challenges to plant safety systems

  2. Junction temperature estimation for an advanced active power cycling test

    DEFF Research Database (Denmark)

    Choi, Uimin; Blaabjerg, Frede; Jørgensen, S.

    2015-01-01

    estimation method using on-state VCE for an advanced active power cycling test is proposed. The concept of the advanced power cycling test is explained first. Afterwards the junction temperature estimation method using on-state VCE and current is presented. Further, the method to improve the accuracy...... of the maximum junction temperature estimation is also proposed. Finally, the validity and effectiveness of the proposed method is confirmed by experimental results.......On-state collector-emitter voltage (VCE) is a good indicator to determine the wear-out condition of power device modules. Further, it is a one of the Temperature Sensitive Electrical Parameters (TSEPs) and thus can be used for junction temperature estimation. In this paper, the junction temperature...

  3. Technology developments for ACIGA high power test facility for advanced interferometry

    Energy Technology Data Exchange (ETDEWEB)

    Barriga, P [School of Physics, University of Western Australia, Perth, WA 6009 (Australia); Barton, M [California Institute of Technology, LIGO Project, Pasadena, CA 91125 (United States); Blair, D G [School of Physics, University of Western Australia, Perth, WA 6009 (Australia)] [and others

    2005-05-21

    The High Optical Power Test Facility for Advanced Interferometry has been built by the Australian Consortium for Interferometric Gravitational Astronomy north of Perth in Western Australia. An 80 m suspended cavity has been prepared in collaboration with LIGO, where a set of experiments to test suspension control and thermal compensation will soon take place. Future experiments will investigate radiation pressure instabilities and optical spring effects in a high power optical cavity with {approx}200 kW circulating power. The facility combines research and development undertaken by all consortium members, whose latest results are presented.

  4. Technology developments for ACIGA high power test facility for advanced interferometry

    International Nuclear Information System (INIS)

    Barriga, P; Barton, M; Blair, D G

    2005-01-01

    The High Optical Power Test Facility for Advanced Interferometry has been built by the Australian Consortium for Interferometric Gravitational Astronomy north of Perth in Western Australia. An 80 m suspended cavity has been prepared in collaboration with LIGO, where a set of experiments to test suspension control and thermal compensation will soon take place. Future experiments will investigate radiation pressure instabilities and optical spring effects in a high power optical cavity with ∼200 kW circulating power. The facility combines research and development undertaken by all consortium members, whose latest results are presented

  5. Property transfer assessments should include radon gas testing

    International Nuclear Information System (INIS)

    Nardi, M.A.

    1992-01-01

    There are two emerging influences that will require radon gas testing as part of many property transfers and most environmental assessments. These requirements come from lending regulators and state legislatures and affect single family, multifamily, and commercial properties. Fannie Mae and others have developed environmental investigation guidelines for protection from long term legal liabilities in the purchase of environmentally contaminated real estate. These guidelines include radon gas testing for many properties. Several states have enacted laws that require environmental disclosure forms be prepared to ensure that the parties involved in certain real estate transactions are aware of the environmental liabilities that may come with the transfer of property. Indiana has recently enacted legislation that would require the disclosure of the presence of radon gas on many commercial real estate transactions. With more banks and state governments following this trend, radon gas testing should be performed during all property transfers and environmental assessments to protect the parties involved from any long term legal liabilities

  6. Summary of Stirling Convertor Testing at NASA Glenn Research Center in Support of Stirling Radioisotope Power System Development

    Science.gov (United States)

    Schifer, Nicholas A.; Oriti, Salvatore M.

    2013-01-01

    The NASA Glenn Research Center (GRC) has been testing 100 We class, free-piston Stirling convertors for potential use in Stirling Radioisotope Power Systems (RPS) for space science and exploration missions. Free-piston Stirling convertors are capable of achieving a 38% conversion efficiency, making Stirling attractive for meeting future power system needs in light of the shrinking U.S. plutonium fuel supply. Convertors currently on test include four Stirling Technology Demonstration Convertors (TDCs), manufactured by the Stirling Technology Company (STC), and six Advanced Stirling Convertors (ASCs), manufactured by Sunpower, Inc. Total hours of operation is greater than 514,000 hours (59 years). Several tests have been initiated to demonstrate the functionality of Stirling convertors for space applications, including: in-air extended operation, thermal vacuum extended operation. Other tests have also been conducted to characterize Stirling performance in anticipated mission scenarios. Data collected during testing has been used to support life and reliability estimates, drive design changes and improve quality, and plan for expected mission scenarios. This paper will provide a summary of convertors tested at NASA GRC and discuss lessons learned through extended testing.

  7. Empirical Power Comparison Of Goodness of Fit Tests for Normality In The Presence of Outliers

    International Nuclear Information System (INIS)

    Saculinggan, Mayette; Balase, Emily Amor

    2013-01-01

    Most statistical tests such as t-tests, linear regression analysis and Analysis of Variance (ANOVA) require the normality assumptions. When the normality assumption is violated, interpretation and inferences may not be reliable. Therefore it is important to assess such assumption before using any appropriate statistical test. One of the commonly used procedures in determining whether a random sample of size n comes from a normal population are the goodness-of-fit tests for normality. Several studies have already been conducted on the comparison of the different goodness-of-fit(see, for example [2]) but it is generally limited to the sample size or to the number of GOF tests being compared(see, for example [2] [5] [6] [7] [8]). This paper compares the power of six formal tests of normality: Kolmogorov-Smirnov test (see [3]), Anderson-Darling test, Shapiro-Wilk test, Lilliefors test, Chi-Square test (see [1]) and D'Agostino-Pearson test. Small, moderate and large sample sizes and various contamination levels were used to obtain the power of each test via Monte Carlo simulation. Ten thousand samples of each sample size and contamination level at a fixed type I error rate α were generated from the given alternative distribution. The power of each test was then obtained by comparing the normality test statistics with the respective critical values. Results show that the power of all six tests is low for small sample size(see, for example [2]). But for n = 20, the Shapiro-Wilk test and Anderson – Darling test have achieved high power. For n = 60, Shapiro-Wilk test and Liliefors test are most powerful. For large sample size, Shapiro-Wilk test is most powerful (see, for example [5]). However, the test that achieves the highest power under all conditions for large sample size is D'Agostino-Pearson test (see, for example [9]).

  8. 78 FR 26771 - Mesa Wind Power Corporation; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-05-08

    ... Wind Power Corporation's application for market-based rate authority, with an accompanying rate... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1346-000] Mesa Wind Power Corporation; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  9. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    Science.gov (United States)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center developed a nonnuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASCs), Dual Convertor Controller (DCC) EMs (engineering models) 2 and 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to actively control a pair of ASCs. The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS), which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and super-capacitor. A load profile, created based on data from several missions, tested the RPS's and RSIL's ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 volts or exceeded 36 volts. Once operation was verified with the DASCS, the tests were repeated with actual operating ASCs. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  10. Advanced power cycler with intelligent monitoring strategy of IGBT module under test

    DEFF Research Database (Denmark)

    Choi, U. M.; Blaabjerg, F.; Iannuzzo, F.

    2017-01-01

    and diode, which for the wear-out condition monitoring are presented. This advanced power cycler allows to perform power cycling test cost-effectively under conditions close to real power converter applications. In addition, an intelligent monitoring strategy for the separation of package-related wear......-out failure mechanisms has been proposed. By means of the proposed method, the wear-out failure mechanisms of an IGBT module can be separated without any additional efforts during the power cycling tests. The validity and effectiveness of the proposed monitoring strategy are also verified by experiments....

  11. Power Systems Development Facility Gasification Test Run TC11

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2003-04-30

    This report discusses Test Campaign TC11 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode of operation using a particulate control device (PCD). Test run TC11 began on April 7, 2003, with startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until April 18, 2003, when a gasifier upset forced the termination of the test run. Over the course of the entire test run, gasifier temperatures varied between 1,650 and 1,800 F at pressures from 160 to 200 psig during air-blown operations and around 135 psig during enriched-air operations. Due to a restriction in the oxygen-fed lower mixing zone (LMZ), the majority of the test run featured air-blown operations.

  12. Radiation Testing of PICA at the Solar Power Tower

    Science.gov (United States)

    White, Susan

    2010-01-01

    Sandia National Laboratory's Solar Power Tower was used to irradiate specimens of Phenolic Impregnated Carbon Ablator (PICA), in order to evaluate whether this thermal protection system material responded differently to potential shock layer radiative heating than to convective heating. Tests were run at 50, 100 and 150 Watts per square centimeter levels of concentrated solar radiation. Experimental results are presented both from spectral measurements on 1- 10 mm thick specimens of PICA, as well as from in-depth temperature measurements on instrumented thicker test specimens. Both spectral measurements and measured in-depth temperature profiles showed that, although it is a porous, low-density material, PICA does not exhibit problematic transparency to the tested high levels of NIR radiation, for all pragmatic cm-to-inch scale thicknesses. PICA acted as a surface absorber to efficiently absorb the incident visible and near infrared incident radiation in the top 2 millimeter layer in the Solar Power Tower tests up to 150 Watts per square centimeter.

  13. Current developments in mechanized non-destructive testing in nuclear power plants; Aktuelle Entwicklungen bei mechanisierten, zerstoerungsfreien Pruefungen in Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Zeilinger, R. [intelligeNDT System und Services GmbH und Co. KG, Erlangen (Germany)

    2008-01-15

    Nuclear power plants require frequent in-service activities to be carried out conscientiously in areas potentially hazardous to human operators (because of the associated radiation exposure), such as non-destructive testing of pressurized components of the steam system. Locations to be inspected in this way include the reactor pressure vessel, core internals, steam generators, pressurizers, and pipes. The codes to be used as a basis of these inspections demand high absolute positioning and repeating accuracy. These requirements can be met by mechanized test procedures. Accordingly, many new applications of, mostly mobile, robots have been developed over the past few years. The innovative control and sensor systems for stationary and mobile robots now on the market offer a potential for economic application in a large number of new areas in inspection, maintenance and service in nuclear power plants. More progress in this area is expected for the near future. Areva NP founded the new NDT Center, NETEC (Non-destructive Examination Technical Center), as a global technical center for non-destructive materials testing. NETEC is to advance research and development of all basic NDT technologies, robotics included. For many years, intelligeNDT has offered solutions and products for a variety of inspection and testing purposes and locations in nuclear power plants and is involved in continuous further development of the experience collected in nuclear power plants on the spot. (orig.)

  14. Shuttle Rudder/Speed Brake Power Drive Unit (PDU) Gear Scuffing Tests With Flight Gears

    Science.gov (United States)

    Proctor, Margaret P.; Oswald, Fred B.; Krants, Timothy L.

    2005-01-01

    Scuffing-like damage has been found on the tooth surfaces of gears 5 and 6 of the NASA space shuttle rudder/speed brake power drive unit (PDU) number 2 after the occurrence of a transient back-driving event in flight. Tests were conducted using a pair of unused spare flight gears in a bench test at operating conditions up to 2866 rpm and 1144 in.-lb at the input ring gear and 14,000 rpm and 234 in.-lb at the output pinion gear, corresponding to a power level of 52 hp. This test condition exceeds the maximum estimated conditions expected in a backdriving event thought to produce the scuffing damage. Some wear marks were produced, but they were much less severe than the scuffing damaged produced during shuttle flight. Failure to produce scuff damage like that found on the shuttle may be due to geometrical variations between the scuffed gears and the gears tested herein, more severe operating conditions during the flight that produced the scuff than estimated, the order of the test procedures, the use of new hydraulic oil, differences between the dynamic response of the flight gearbox and the bench-test gearbox, or a combination of these. This report documents the test gears, apparatus, and procedures, summarizes the test results, and includes a discussion of the findings, conclusions, and recommendations.

  15. Practical test of the LINAC4 RF power system

    CERN Document Server

    Schwerg, N

    2011-01-01

    The high RF power for the Linac4 accelerating structures will be generated by thirteen 1.3 MW klystrons, previously used for the CERN LEP accelerator, and six new klystrons of 2.8 MW all operating at a frequency of 352.2 MHz. The power distribution scheme features a folded magic tee feeding the power from one 2.8 MW klystron to two LEP circulators. We present first results from the Linac4 test place, validating the approach and the used components as well as reporting on the klystron re-tuning activities.

  16. 77 FR 62510 - Niagara Wind Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2012-10-15

    ... Wind Power, LLC's application for market-based rate authority, with an accompanying rate schedule... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-17-000] Niagara Wind Power, LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket...

  17. 75 FR 42745 - Hardscrabble Wind Power LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-1725-000] Hardscrabble Wind Power LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... of Hardscrabble Wind Power LLC's application for market-based rate authority, with an accompanying...

  18. Reliability assessment of distribution power systems including distributed generations

    International Nuclear Information System (INIS)

    Megdiche, M.

    2004-12-01

    Nowadays, power systems have reached a good level of reliability. Nevertheless, considering the modifications induced by the connections of small independent producers to distribution networks, there's a need to assess the reliability of these new systems. Distribution networks present several functional characteristics, highlighted by the qualitative study of the failures, as dispersed loads at several places, variable topology and some electrotechnical phenomena which must be taken into account to model the events that can occur. The adopted reliability calculations method is Monte Carlo simulations, the probabilistic method most powerful and most flexible to model complex operating of the distribution system. We devoted a first part on the case of a 20 kV feeder to which a cogeneration unit is connected. The method was applied to a software of stochastic Petri nets simulations. Then a second part related to the study of a low voltage power system supplied by dispersed generations. Here, the complexity of the events required to code the method in an environment of programming allowing the use of power system calculations (load flow, short-circuit, load shedding, management of units powers) in order to analyse the system state for each new event. (author)

  19. Operation manual for the core flow test loop zone power-supply controller

    Energy Technology Data Exchange (ETDEWEB)

    Harper, R.E.

    1981-11-01

    The core flow test loop, which is part of the Gas-Cooled Fast Breeder Reactor Program (GCFR) at ORNL, is a high-pressure, high-temperature, out-of-reactor helium circulation system that is being constructed to permit study of the performance at steady-state and transient conditions of simulated segments of core assemblies for a GCFR demonstration plant. The simulated core segments, which are divided into zones, contain electrical heating elements to simulate the heat generated by fission. To control the power which is applied to a zone, a novel multitapped transformer and zone power control system have been designed and built which satisfy stringent design criteria. The controller can match power output to demand to within better than +-1% over a 900:1 dynamic range and perform full-power transients within 1 s. The power is applied in such a way as to minimize the electromagnetic interference at the bandwidth of the loop instrumentation, and the controller incorporates several error detection techniques, making it inherently fail-safe. The operation manual describes the specifications, operating instructions, error detection capabilities, error recovery, troubleshooting, calibration and QA procedures, and maintenance requirements. Also included are sections on the theory of operation, circuitry description, and a complete set of schematics.

  20. Comparison between Standing Broad Jump test and Wingate test for assessing lower limb anaerobic power in elite sportsmen.

    Science.gov (United States)

    Krishnan, Anup; Sharma, Deep; Bhatt, Madhu; Dixit, Apoorv; Pradeep, P

    2017-04-01

    Lower limb explosive power is an important motor quality for sporting performance and indicates use of anaerobic energy systems like stored ATP and Creatine phosphate system. Weightlifting, Fencing and Wrestling use it for monitoring and identification of potential sportsmen. The Wingate test and Standing Broad Jump (SBJ) test are reliable and accurate tests for its assessment. This study conducted on elite Indian sportsmen tries to analyse feasibility of use of the SBJ test in sports and military medicine when Wingate test is impractical. 95 elite sportsmen (51 Fencers, 17 Weight lifters and 27 Wrestlers) of a sports institute were administered Wingate cycle ergometer test and SBJ under standardised conditions. The results were analysed for mass and inter-discipline correlation. Analysis using Pearson's correlation showed significant positive correlation between Peak power ( r  = 0.446, p  Weightlifters. Bland-Altman plot analysis showed that about 94% pairs of peak power and SBJ were within limits of agreement for each discipline as well as among all sportsmen. The test results show definite correlation and SBJ test can be used as a field test in performance monitoring, talent identification, military recruit screening and injury prevention.

  1. Simulation of Valve Operation for Flow Interrupt Test in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jae Hyung; Shin, Dae Yong; Shin, Dong Woo; Kim, Charn Jung; Lee, Jung Hee

    2012-01-01

    The valve used in nuclear power plant must be qualified for the function according to the KEPIC MF. The test valve must be selected by shape and size, which is given by KEPIC MF. In the functional test, the mathematical model for the valve operation is needed. The mathematical model must be verified by the test, whose method and procedure is defined in KEPIC MF. The lack of analytical technique has lead to the poor mathematical model, with which the functional test for the big valve is impossible with analytical method. Especially, the tank and rupture disk in the flow test is not considered and the result of the analysis is so different to the real one. In these days, the 3D model for the flow interrupt test makes more accurate analysis. And no facility about functional test reduces the research will for the nuclear power plant valve. For this problem, the test facility for the functional test of the valve and pump in nuclear power plant has been made until 2012. With the test facility, the research project related the valve were initiated in KIMM( Korea Institute of Machinery and Materials). And the joint project to SNU(Seoul National University) has been going on the numerical analysis for the valve in nuclear power plant. Using the commercial software and user subroutine, UDF, the co-simulation with multi-body dynamic and fluid flow analysis and the addition of tank and rupture disk to the user subroutine make possible to simulate the flow interrupt test numerically. This is not simple and regular analysis, which was introduced in user subroutine. In order to simulate the real situation, the engineering work, related mathematical model, and the programming in the user subroutine are needed. This study is on the making the mathematical model for the functional test of the valve in nuclear power plan. The functional test is the real test procedure and defined in KEPIC MF

  2. Performance evaluation of UO2-Zr fuel in power ramp tests

    International Nuclear Information System (INIS)

    Knudsen, P.; Bagger, C.

    1977-01-01

    In power reactors using UO 2 -Zr fuel, rapid power increases may lead to failures in fuel pins that have been irradiated at steady or decreasing heat loads. This paper presents results which extend the experience with power ramp performance of high burn-up fuel pins. A test fuel element containing both pellet and vipac UO 2 -Zr fuel pins was irradiated in the HBWR at Halden for effectively 2 1/2 years to an average burn-up of 21,000 MWD/te UO 2 at gradually decreasing power levels. The subsequent non-destructive characterization revealed formation of transverse cracks in the vipac fuel columns. After the HBWR irradiation, five of the fuel pins were power ramp tested individually in the DR 3 Reactor at Riso. The ramp rates in this test series were in the range 3-60 W/cm min. The maximum local heat loads seen in the ramp tests were 20-120% above the highest levels experienced at the same axial positions during the HBWR irradiation. Three pellets and one vipac fuel pin failed, whereas another vipac pin gave no indication of clad penetration. Profilometry after the ramp testing indicated the formation of small ridges for both types of fuel pins. For vipac fuel, the ridges were less regularly distributed along the pin length than for pellet fuel. Neutron radiography revealed the formation of additional transverse and longitudinal fuel cracks during the power ramps for both types of fuel pins. The observed failures seemed to be marginal since little or no indication as to the locations of the clad penetrations could be derived from the non-destructive post-irradiation examinations. The cases have been analyzed by means of the Danish fuel performance codes. The calculations, which are in general agreement with the observations, are discussed. The results of the investigations indicate qualitative similarities in over power performance of the two fuel types

  3. Power supply for the Spanish stellarator TJ-II, design, construction, and tests

    Energy Technology Data Exchange (ETDEWEB)

    Perez, A.; Lucia, C.; Alberdi, B.; Del Rio, J.M. [JEMA SA, Lasarte-Oria (Spain); Almoguera, L.; Blaumoser, M.; Kirpitchev, I.; Mendez, P. [Asociacion EURATOM-CIEMAT para Fusion, Madrid (Spain)

    1995-12-31

    Most of the components of the electrical power supply system of the new TJ-II stellarator, which is under construction in Madrid (Spain), are now constructed and tested. The flywheel synchronous generator is still under construction and its tests are planned for the end of 1995. The power plant is described in detail as well as the tests which have been carried out and their results.

  4. Testing for new physics: neutrinos and the primordial power spectrum

    Energy Technology Data Exchange (ETDEWEB)

    Canac, Nicolas; Abazajian, Kevork N. [Department of Physics, University of California at Irvine, Irvine, CA 92697 (United States); Aslanyan, Grigor [Berkeley Center for Cosmological Physics, University of California, Berkeley, CA 94720 (United States); Easther, Richard [Department of Physics, University of Auckland, Private Bag 92019, Auckland (New Zealand); Price, Layne C., E-mail: ncanac@uci.edu, E-mail: aslanyan@berkeley.edu, E-mail: kevork@uci.edu, E-mail: r.easther@auckland.ac.nz, E-mail: laynep@andrew.cmu.edu [McWilliams Center for Cosmology, Department of Physics, Carnegie Mellon University, Pittsburgh, PA 15213 (United States)

    2016-09-01

    We test the sensitivity of neutrino parameter constraints from combinations of CMB and LSS data sets to the assumed form of the primordial power spectrum (PPS) using Bayesian model selection. Significantly, none of the tested combinations, including recent high-precision local measurements of H{sub 0} and cluster abundances, indicate a signal for massive neutrinos or extra relativistic degrees of freedom. For PPS models with a large, but fixed number of degrees of freedom, neutrino parameter constraints do not change significantly if the location of any features in the PPS are allowed to vary, although neutrino constraints are more sensitive to PPS features if they are known a priori to exist at fixed intervals in log k . Although there is no support for a non-standard neutrino sector from constraints on both neutrino mass and relativistic energy density, we see surprisingly strong evidence for features in the PPS when it is constrained with data from Planck 2015, SZ cluster counts, and recent high-precision local measurements of H{sub 0}. Conversely combining Planck with matter power spectrum and BAO measurements yields a much weaker constraint. Given that this result is sensitive to the choice of data this tension between SZ cluster counts, Planck and H{sub 0} measurements is likely an indication of unmodeled systematic bias that mimics PPS features, rather than new physics in the PPS or neutrino sector.

  5. Post-Mortem Analysis after High-Power Operation of the TD24_R05 Tested in Xbox_1

    CERN Document Server

    Degiovanni, Alberto; Mouriz Irazabal, Nerea; Aicheler, Markus

    2016-01-01

    The CLIC prototype structure TD24_R05 has been high power tested in Xbox_1 in 2013. This report summarizes all examinations conducted after the high power test including bead-pull measurements, structure cutting, metrology and SEM observations. A synthesis of the various results is then made. The structure developed a hot cell progressively during operation and detuning was observed after the test was complete. The post mortem examination clearly showed a developed standing wave pattern which was explained by the physical deformation of one of the coupler iris. An elevated breakdown count through SEM imaging in the suspected hot cell however could not be confirmed. Neither any particular feature offering an explanation for the observed longitudinal breakdown distribution could be detected.

  6. Purchasing power parity in OECD countries: nonlinear unit root tests revisited

    OpenAIRE

    Juan Carlos Cuestas; Paulo José Regis

    2010-01-01

    The aim of this paper is to provide additional evidence on the purchasing power parity empirical fulfillment in a pool of OECD countries. We apply the Harvey et al. (2008) linearity test and the Kruse (2010) nonlinear unit root test. The results point to the fact that the purchasing power parity theory holds in a greater number of countries than has been reported in previous studies.

  7. 76 FR 2368 - Balance Power Systems, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2011-01-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2331-000] Balance Power Systems, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... proceeding of Balance Power Systems, LLC's application for market-based rate authority, with an accompanying...

  8. Systematic evaluation program review of NRC Safety Topic VI-10.A associated with the electrical, instrumentation and control portions of the testing of reactor trip system and engineered safety features, including response time for the Dresden station, Unit II nuclear power plant

    International Nuclear Information System (INIS)

    St Leger-Barter, G.

    1980-11-01

    This report documents the technical evaluation and review of NRC Safety Topic VI-10.A, associated with the electrical, instrumentation, and control portions of the testing of reactor trip systems and engineered safety features including response time for the Dresden II nuclear power plant, using current licensing criteria

  9. Semiparametric Power Envelopes for Tests of the Unit Root Hypothesis

    DEFF Research Database (Denmark)

    Jansson, Michael

    This paper derives asymptotic power envelopes for tests of the unit root hypothesis in a zero-mean AR(1) model. The power envelopes are derived using the limits of experiments approach and are semiparametric in the sense that the underlying error distribution is treated as an unknown...

  10. 40 CFR 1039.505 - How do I test engines using steady-state duty cycles, including ramped-modal testing?

    Science.gov (United States)

    2010-07-01

    ...-state duty cycles, including ramped-modal testing? 1039.505 Section 1039.505 Protection of Environment... duty cycles, including ramped-modal testing? This section describes how to test engines under steady-state conditions. In some cases, we allow you to choose the appropriate steady-state duty cycle for an...

  11. Experience using individually supplied heater rods in critical power testing of advanced BWR fuel

    Energy Technology Data Exchange (ETDEWEB)

    Majed, M.; Morback, G.; Wiman, P. [ABB Atom AB, Vasteras (Sweden)] [and others

    1995-09-01

    The ABB Atom FRIGG loop located in Vasteras Sweden has during the last six years given a large experience of critical power measurements for BWR fuel designs using indirectly heated rods with individual power supply. The loop was built in the sixties and designed for maximum 100 bar pressure. Testing up to the mid eighties was performed with directly heated rods using a 9 MW, 80 kA power supply. Providing test data to develop critical power correlations for BWR fuel assemblies requires testing with many radial power distributions over the full range of hydraulic conditions. Indirectly heated rods give large advantages for the testing procedure, particularly convenient for variation of individual rod power. A test method being used at Stern Laboratories (formerly Westinghouse Canada) since the early sixties, allows one fuel assembly to simulate all required radial power distributions. This technique requires reliable indirectly heated rods with independently controlled power supplies and uses insulated electric fuel rod simulators with built-in instrumentation. The FRIGG loop was adapted to this system in 1987. A 4MW power supply with 10 individual units was then installed, and has since been used for testing 24 and 25 rod bundles simulating one subbundle of SVEA-96/100 type fuel assemblies. The experience with the system is very good, as being presented, and it is selected also for a planned upgrading of the facility to 15 MW.

  12. Tevatron HTS power lead test

    International Nuclear Information System (INIS)

    Feher, S.; Carcagno, R.; Orris, D.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.; Tompkins, J.C.

    2004-01-01

    Two pairs of ASC 6 kA power leads developed for the Tevatron were successfully tested at Fermilab at over-current conditions. Stable operation was achieved while operating at a current of 9.56 kA for five hours and while continuously ramping between 0-9.56 kA at a ramp rate of 200 A/s for one hour. The minimum required liquid nitrogen flow rate was measured to be 1.5 g/s at 10 kA. After ramping up to 10 kA at 200A/s, it took only 15 minutes to stabilize the upper copper section of the lead with a flow of 1.8 g/s of liquid nitrogen vapor. Testing under extreme operating conditions--270-370 kPa liquid nitrogen vapor pressure and over 0.1 T external magnetic field--demonstrated that the HTS part of the lead can safely operate in the current sharing mode and that this design has large operating margin

  13. Testing the Predictive Power of Coulomb Stress on Aftershock Sequences

    Science.gov (United States)

    Woessner, J.; Lombardi, A.; Werner, M. J.; Marzocchi, W.

    2009-12-01

    Empirical and statistical models of clustered seismicity are usually strongly stochastic and perceived to be uninformative in their forecasts, since only marginal distributions are used, such as the Omori-Utsu and Gutenberg-Richter laws. In contrast, so-called physics-based aftershock models, based on seismic rate changes calculated from Coulomb stress changes and rate-and-state friction, make more specific predictions: anisotropic stress shadows and multiplicative rate changes. We test the predictive power of models based on Coulomb stress changes against statistical models, including the popular Short Term Earthquake Probabilities and Epidemic-Type Aftershock Sequences models: We score and compare retrospective forecasts on the aftershock sequences of the 1992 Landers, USA, the 1997 Colfiorito, Italy, and the 2008 Selfoss, Iceland, earthquakes. To quantify predictability, we use likelihood-based metrics that test the consistency of the forecasts with the data, including modified and existing tests used in prospective forecast experiments within the Collaboratory for the Study of Earthquake Predictability (CSEP). Our results indicate that a statistical model performs best. Moreover, two Coulomb model classes seem unable to compete: Models based on deterministic Coulomb stress changes calculated from a given fault-slip model, and those based on fixed receiver faults. One model of Coulomb stress changes does perform well and sometimes outperforms the statistical models, but its predictive information is diluted, because of uncertainties included in the fault-slip model. Our results suggest that models based on Coulomb stress changes need to incorporate stochastic features that represent model and data uncertainty.

  14. A test of reproductive power in snakes.

    Science.gov (United States)

    Boback, Scott M; Guyer, Craig

    2008-05-01

    Reproductive power is a contentious concept among ecologists, and the model has been criticized on theoretical and empirical grounds. Despite these criticisms, the model has successfully predicted the modal (optimal) size in three large taxonomic groups and the shape of the body size distribution in two of these groups. We tested the reproductive power model on snakes, a group that differs markedly in physiology, foraging ecology, and body shape from the endothermic groups upon which the model was derived. Using detailed field data from the published literature, snake-specific constants associated with reproductive power were determined using allometric relationships of energy invested annually in egg production and population productivity. The resultant model accurately predicted the mode and left side of the size distribution for snakes but failed to predict the right side of that distribution. If the model correctly describes what is possible in snakes, observed size diversity is limited, especially in the largest size classes.

  15. 78 FR 56691 - Sapphire Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-09-13

    ... Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Sapphire Power Marketing LLC's application for market-based rate authority, with an accompanying rate... submission of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  16. Design, Construction and Testing of an Uninterruptible Power ...

    African Journals Online (AJOL)

    Design, Construction and Testing of an Uninterruptible Power Supply of 300 Watts Capacity. ... is transformed using the transformer to 240v a.c., 50Hz. The system also has in-built voltage reversal protection, automatic change-over and battery ...

  17. Results of Laboratory Testing of Advanced Power Strips

    Energy Technology Data Exchange (ETDEWEB)

    Earle, L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sparn, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-08-01

    Presented at the ACEEE Summer Study on Energy Efficiency in Buildings on August 12-17, 2012, this presentation reports on laboratory tests of 20 currently available advanced power strip products, which reduce wasteful electricity use of miscellaneous electric loads in buildings.

  18. SUPER-CAPACITOR APPLICATION IN ELECTRICAL POWER CABLE TESTING FACILITIES IN THERMAL ENDURANCE AND MECHANICAL BRACING TESTS

    Directory of Open Access Journals (Sweden)

    I. V. Oleksyuk

    2015-01-01

    Full Text Available The current-carrying cores of the electrical power cables should be resistant to effects of short-circuit currents whose values depend on the material of the core, its cross-sectional area, cable insulation properties, environment temperature, and the duration of the short-circuit current flow (1 and 3–4 sec. when tested for thermal endurance and mechanical bracing. The facilities for testing the 10 kV aluminum core cables with short-circuit current shall provide mechanical-bracing current 56,82 kA and thermal endurance current 11,16 kA. Although capacitors provide such values of the testing currents to the best advantage, utilizing conventional capacitor-units will involve large expenditures for erecting and  running a separate building. It is expedient to apply super-capacitors qua the electric power supply for testing facilities, as they are capacitors with double-electrical layer and involve the current values of tens of kilo-amperes.The insulation voltage during short-circuit current testing being not-standardized, it is not banned to apply voltages less than 10 kV when performing short-circuit thermal endurance and mechanical bracing tests for electrical power cables of 10 kV. The super-capacitor voltage variation-in-time graph consists of two regions: capacitive and resistive. The capacitive part corresponds to the voltage change consequent on the energy change in the super-capacitors. The resistive part shows the voltage variation due to the active resistance presence in the super-capacitor.The author offers the algorithm determining the number of super capacitors requisite for testing 10 kV-electrical power cables with short-circuit currents for thermal endurance and mechanical bracing. The paper shows that installation of super-capacitors in the facilities testing the cables with short-circuit currents reduces the area needed for the super-capacitors in comparison with conventional capacitors more than by one order of magnitude.

  19. Heat Pipe Powered Stirling Conversion for the Demonstration Using Flattop Fission (DUFF) Test

    Science.gov (United States)

    Gibson, Marc A.; Briggs, Maxwell H.; Sanzi, James L.; Brace, Michael H.

    2013-01-01

    Design concepts for small Fission Power Systems (FPS) have shown that heat pipe cooled reactors provide a passive, redundant, and lower mass option to transfer heat from the fuel to the power conversion system, as opposed to pumped loop designs typically associated with larger FPS. Although many systems have been conceptually designed and a few making it to electrically heated testing, none have been coupled to a real nuclear reactor. A demonstration test named DUFF Demonstration Using Flattop Fission, was planned by the Los Alamos National Lab (LANL) to use an existing criticality experiment named Flattop to provide the nuclear heat source. A team from the NASA Glenn Research Center designed, built, and tested a heat pipe and power conversion system to couple to Flattop with the end goal of making electrical power. This paper will focus on the design and testing performed in preparation for the DUFF test.

  20. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    Science.gov (United States)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  1. Harmonics and voltage stability analysis in power systems including

    Indian Academy of Sciences (India)

    In this study, non-sinusoidal quantities and voltage stability, both known as power quality criteria, are examined together in detail. The widespread use of power electronics elements cause the existence of significant non-sinusoidal quantities in the system. These non-sinusoidal quantities can create serious harmonic ...

  2. Radiological design criteria for fusion power test facilities

    International Nuclear Information System (INIS)

    Singh, M.S.; Campbell, G.W.

    1982-01-01

    The quest for fusion power and understanding of plasma physics has resulted in planning, design, and construction of several major fusion power test facilities, based largely on magnetic and inertial confinement concepts. We have considered radiological design aspects of the Joint European Torus (JET), Livermore Mirror and Inertial Fusion projects, and Princeton Tokamak. Our analyses on radiological design criteria cover acceptable exposure levels at the site boundary, man-rem doses for plant personnel and population at large, based upon experience gained for the fission reactors, and on considerations of cost-benefit analyses

  3. High-power tests of a single-cell copper accelerating cavity driven by two input couplers

    International Nuclear Information System (INIS)

    Horan, D.; Bromberek, D.; Meyer, D.; Waldschmidt, G.

    2008-01-01

    High-power tests were conducted on a 350-MHz, single-cell copper accelerating cavity driven simultaneously by two H-loop input couplers for the purpose of determining the reliability, performance, and power-handling capability of the cavity and related components, which have routinely operated at 100-kW power levels. The test was carried out utilizing the APS 350-MHz RF Test Stand, which was modified to split the input rf power into two frac12-power feeds, each supplying power to a separate H-loop coupler on the cavity. Electromagnetic simulations of the two-coupler feed system were used to determine coupler match, peak cavity fields, and the effect of phasing errors between the coupler feed lines. The test was conducted up to a maximum total rf input power of 164-kW CW. Test apparatus details and performance data will be presented.

  4. Tests of cooling water pumps at Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Travnicek, J.

    1986-01-01

    Tests were performed to examine the operating conditions of the 1600 BQDV cooling pumps of the main coolant circuit of unit 1 of the Dukovany nuclear power plant. For the pumps, the performance was tested in the permissible operating range, points were measured below this range and the guaranteed operating point was verified. Pump efficiency was calculated from the measured values. The discussion of the measurement of parameters has not yet been finished because the obtained values of the amount delivered and thus of the pump efficiency were not up to expectation in all detail. It was also found that for obtaining the guaranteed flow the pump impeller had to be opened to 5deg -5.5deg instead of the declared 3deg. Also tested were pump transients, including the start of the pump, its stop, the operation and failure of one of the two pumps. In these tests, pressures were also measured at the inlet and the outlet of the inner part of the TG 11 turbine condenser. It was shown that the time course and the pressure course of the processes were acceptable. In addition to these tests, pressure losses in the condenser and the cooling water flow through the feed pump electromotor cooler wre tested for the case of a failure of one of the two pumps. (E.S.)

  5. Refined Diebold-Mariano Test Methods for the Evaluation of Wind Power Forecasting Models

    Directory of Open Access Journals (Sweden)

    Hao Chen

    2014-07-01

    Full Text Available The scientific evaluation methodology for the forecast accuracy of wind power forecasting models is an important issue in the domain of wind power forecasting. However, traditional forecast evaluation criteria, such as Mean Squared Error (MSE and Mean Absolute Error (MAE, have limitations in application to some degree. In this paper, a modern evaluation criterion, the Diebold-Mariano (DM test, is introduced. The DM test can discriminate the significant differences of forecasting accuracy between different models based on the scheme of quantitative analysis. Furthermore, the augmented DM test with rolling windows approach is proposed to give a more strict forecasting evaluation. By extending the loss function to an asymmetric structure, the asymmetric DM test is proposed. Case study indicates that the evaluation criteria based on DM test can relieve the influence of random sample disturbance. Moreover, the proposed augmented DM test can provide more evidence when the cost of changing models is expensive, and the proposed asymmetric DM test can add in the asymmetric factor, and provide practical evaluation of wind power forecasting models. It is concluded that the two refined DM tests can provide reference to the comprehensive evaluation for wind power forecasting models.

  6. Impact test characterization of carbon-carbon composites for the thermoelectric space power system

    International Nuclear Information System (INIS)

    Romanoski, G.R.; Pih, Hui.

    1995-01-01

    Thirty-eight unique carbon-carbon composite materials of cylindrical architecture were fabricated by commercial vendors for evaluation as alternative impact shell materials for the modular heat source of the thermoelectric space power system. Characterization of these materials included gas gun impact tests where cylindrical specimens containing a mass simulant were fired at 55 m/s to impact a target instrumented to measure force. The force versus time output was analyzed to determine: peak force, acceleration, velocity, and displacement. All impact tests exhibited an equivalence between preimpact momentum and measured impulse. In addition, energy was conserved based on a comparison of preimpact kinetic energy and measured work. Impact test results showed that the currently specified material provided impact energy absorption comparable to the best alternatives considered to date

  7. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  8. Power-Hardware-In-the-Loop (PHIL) Test of VSC-based HVDC connection for Offshore Wind Power Plants (WPPs)

    DEFF Research Database (Denmark)

    Sharma, Ranjan; Cha, Seung-Tae; Wu, Qiuwei

    2011-01-01

    This paper presents a power-hardware-in-the-loop (PHIL) test for an offshore wind power plant (WPP) interconnected to the onshore grid by a VSC-based HVDC connection. The intention of the PHIL test is to verify the control coordination between the plant side converter of the HVDC connection...... the successful control coordination between the WPP and the plant side VSC converter of the HVDC connection of the WPP....

  9. Power of tests for comparing trend curves with application to national immunization survey (NIS).

    Science.gov (United States)

    Zhao, Zhen

    2011-02-28

    To develop statistical tests for comparing trend curves of study outcomes between two socio-demographic strata across consecutive time points, and compare statistical power of the proposed tests under different trend curves data, three statistical tests were proposed. For large sample size with independent normal assumption among strata and across consecutive time points, the Z and Chi-square test statistics were developed, which are functions of outcome estimates and the standard errors at each of the study time points for the two strata. For small sample size with independent normal assumption, the F-test statistic was generated, which is a function of sample size of the two strata and estimated parameters across study period. If two trend curves are approximately parallel, the power of Z-test is consistently higher than that of both Chi-square and F-test. If two trend curves cross at low interaction, the power of Z-test is higher than or equal to the power of both Chi-square and F-test; however, at high interaction, the powers of Chi-square and F-test are higher than that of Z-test. The measurement of interaction of two trend curves was defined. These tests were applied to the comparison of trend curves of vaccination coverage estimates of standard vaccine series with National Immunization Survey (NIS) 2000-2007 data. Copyright © 2011 John Wiley & Sons, Ltd.

  10. Tests of the power PC theory of causal induction with negative contingencies.

    Science.gov (United States)

    Shanks, David R

    2002-01-01

    The power PC theory of causal induction (Cheng, 1997) proposes that causal estimates are based on the power p of a potential cause, where p is the contingency between the cause and effect normalized by the base rate of the effect. Previous tests of this theory have concentrated on generative causes that have positive contingencies with their associated outcomes. Here we empirically test this theory in two experiments using preventive causes that have negative contingencies for their outcomes. Contrary to the power PC theory, the results show that causal judgments vary with contingency across conditions of constant power p. This pattern is consistent, however, with several alternative accounts of causal judgment.

  11. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  12. A Note on Confidence Interval for the Power of the One Sample Test

    Directory of Open Access Journals (Sweden)

    A. Wong

    2010-01-01

    Full Text Available In introductory statistics texts, the power of the test of a one-sample mean when the variance is known is widely discussed. However, when the variance is unknown, the power of the Student's -test is seldom mentioned. In this note, a general methodology for obtaining inference concerning a scalar parameter of interest of any exponential family model is proposed. The method is then applied to the one-sample mean problem with unknown variance to obtain a (1−100% confidence interval for the power of the Student's -test that detects the difference (−0. The calculations require only the density and the cumulative distribution functions of the standard normal distribution. In addition, the methodology presented can also be applied to determine the required sample size when the effect size and the power of a size test of mean are given.

  13. Operational Performance and Improvements to the RF Power Sources for the Compact Linear Collider Test Facility (CTF3) at CERN

    CERN Document Server

    McMonagle, Gerard

    2006-01-01

    The CERN CTF3 facility is being used to test and demonstrate key technical issues for the CLIC (Compact Linear Collider) study. Pulsed RF power sources are essential elements in this test facility. Klystrons at S-band (29998.55 GHz), in conjunction with pulse compression systems, are used to power the Drive Beam Accelerator (DBA) to achieve an electron beam energy of 150 MeV. The L-Band RF system, includes broadband Travelling Wave Tubes (TWTs) for beam bunching with 'phase coded' sub pulses in the injector and a narrow band high power L-Band klystron powering the transverse 1.5GHz RF deflector in the Delay Loop immediately after the DBA. This paper describes these different systems and discusses their operational performance.

  14. Operational performance and improvements to the rf power sources for the Compact Linear Collider Test Facility (CTF3) at CERN

    CERN Document Server

    McMonagle, Gerard

    2006-01-01

    The CERN CTF3 facility is being used to test and demonstrate key technical issues for the CLIC (Compact Linear Collider) study. Pulsed RF power sources are essential elements in this test facility. Klystrons at S-band (29998.55 GHz), in conjunction with pulse compression systems, are used to power the Drive Beam Accelerator (DBA) to achieve an electron beam energy of 150 MeV. The L-Band RF system, includes broadband Travelling Wave Tubes (TWTs) for beam bunching with 'phase coded' sub pulses in the injector and a narrow band high power L-Band klystron powering the transverse 1.5 GHz RF deflector in the Delay Loop immediately after the DBA. This paper describes these different systems and discusses their operational performance.

  15. Development and testing of improved statistical wind power forecasting methods.

    Energy Technology Data Exchange (ETDEWEB)

    Mendes, J.; Bessa, R.J.; Keko, H.; Sumaili, J.; Miranda, V.; Ferreira, C.; Gama, J.; Botterud, A.; Zhou, Z.; Wang, J. (Decision and Information Sciences); (INESC Porto)

    2011-12-06

    (with spatial and/or temporal dependence). Statistical approaches to uncertainty forecasting basically consist of estimating the uncertainty based on observed forecasting errors. Quantile regression (QR) is currently a commonly used approach in uncertainty forecasting. In Chapter 3, we propose new statistical approaches to the uncertainty estimation problem by employing kernel density forecast (KDF) methods. We use two estimators in both offline and time-adaptive modes, namely, the Nadaraya-Watson (NW) and Quantilecopula (QC) estimators. We conduct detailed tests of the new approaches using QR as a benchmark. One of the major issues in wind power generation are sudden and large changes of wind power output over a short period of time, namely ramping events. In Chapter 4, we perform a comparative study of existing definitions and methodologies for ramp forecasting. We also introduce a new probabilistic method for ramp event detection. The method starts with a stochastic algorithm that generates wind power scenarios, which are passed through a high-pass filter for ramp detection and estimation of the likelihood of ramp events to happen. The report is organized as follows: Chapter 2 presents the results of the application of ITL training criteria to deterministic WPF; Chapter 3 reports the study on probabilistic WPF, including new contributions to wind power uncertainty forecasting; Chapter 4 presents a new method to predict and visualize ramp events, comparing it with state-of-the-art methodologies; Chapter 5 briefly summarizes the main findings and contributions of this report.

  16. Power Tillers for Demining: Blast Test

    Directory of Open Access Journals (Sweden)

    Emanuela Elisa Cepolina

    2007-06-01

    Full Text Available Power tillers are very simple and versatile machines with large scale diffusion in developing countries, where they are commonly used both for agriculture and for transportation purposes. A new integrated participatory approach that makes use of and improves local end-users knowledge has been used to design a new robotic system for humanitarian demining applications in Sri Lanka, using power tiller as core module. A demining machine composed by a tractor unit, a ground processing tool and a vegetation cutting tool is here presented together with results obtained from the first blast test on the preliminary version of tractor unit armouring. Different breakable connections between wheels and axle have been designed to cause physical detachment and interrupt the transmission of the shock wave released by the explosion of a mine under one wheel. Effects of explosions on different types of wheels and on the chassis have been recorded and commented.

  17. Power Tillers for Demining: Blast Test

    Directory of Open Access Journals (Sweden)

    Emanuela Elisa Cepolina

    2008-11-01

    Full Text Available Power tillers are very simple and versatile machines with large scale diffusion in developing countries, where they are commonly used both for agriculture and for transportation purposes. A new integrated participatory approach that makes use of and improves local end-users knowledge has been used to design a new robotic system for humanitarian demining applications in Sri Lanka, using power tiller as core module. A demining machine composed by a tractor unit, a ground processing tool and a vegetation cutting tool is here presented together with results obtained from the first blast test on the preliminary version of tractor unit armouring. Different breakable connections between wheels and axle have been designed to cause physical detachment and interrupt the transmission of the shock wave released by the explosion of a mine under one wheel. Effects of explosions on different types of wheels and on the chassis have been recorded and commented.

  18. Testing for purchasing power parity in the long-run for ASEAN-5

    Science.gov (United States)

    Choji, Niri Martha; Sek, Siok Kun

    2017-04-01

    For more than a decade, there has been a substantial interest in testing for the validity of the purchasing power parity (PPP) hypothesis empirically. This paper performs a test on revealing a long-run relative Purchasing Power Parity for a group of ASEAN-5 countries for the period of 1996-2016 using monthly data. For this purpose, we used the Pedroni co-integration method to test for the long-run hypothesis of purchasing power parity. We first tested for the stationarity of the variables and found that the variables are non-stationary at levels but stationary at first difference. Results of the Pedroni test rejected the null hypothesis of no co-integration meaning that we have enough evidence to support PPP in the long-run for the ASEAN-5 countries over the period of 1996-2016. In other words, the rejection of null hypothesis implies a long-run relation between nominal exchange rates and relative prices.

  19. Field vibration test of principal equipment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Shiraki, Kazuhiro; Fujita, Katsuhisa; Kajimura, Motohiko; Ikegami, Yasuhiko; Hanzawa, Katsumi; Sakai, Yoshiyuki; Kokubo, Eiji; Igarashi, Shigeru

    1984-09-01

    Japan is one of the most earthquake-stricken countries in the world, and demands for aseismic design have become severer recently. In a nuclear power plant in particular, consisting of a reactor vessel and other facilities dealing with a radioactive substance in some form or other, it is essential from the standpoint of safety to eliminate any possibility of radioactive hazards for the local public, and the employees at the plant as well, if these facilities are struck by an earthquake. This paper is related to the reactor vessel, reactor primary cooling equipment and piping system and important general piping as examples of important facilities of a nuclear power plant, and discusses vibration tests of an actual plant in the field from the standpoint of enhancing the aseismic safety of the Mitsubishi PWR nuclear power plant. Especially concerning vibration test technology, the effects in the evaluation of aseismic safety and its limits are studied to prove how it contributes to the enhancement of the reliability of aseismic design of nuclear power plants.

  20. Irradiation Tests Supporting LEU Conversion of Very High Power Research Reactors in the US

    Energy Technology Data Exchange (ETDEWEB)

    Woolstenhulme, N. E.; Cole, J. I.; Glagolenko, I.; Holdaway, K. K.; Housley, G. K.; Rabin, B. H.

    2016-10-01

    The US fuel development team is developing a high density uranium-molybdenum alloy monolithic fuel to enable conversion of five high-power research reactors. Previous irradiation tests have demonstrated promising behavior for this fuel design. A series of future irradiation tests will enable selection of final fuel fabrication process and provide data to qualify the fuel at moderately-high power conditions for use in three of these five reactors. The remaining two reactors, namely the Advanced Test Reactor and High Flux Isotope Reactor, require additional irradiation tests to develop and demonstrate the fuel’s performance with even higher power conditions, complex design features, and other unique conditions. This paper reviews the program’s current irradiation testing plans for these moderately-high irradiation conditions and presents conceptual testing strategies to illustrate how subsequent irradiation tests will build upon this initial data package to enable conversion of these two very-high power research reactors.

  1. Verification tests for remote controlled inspection system in nuclear power plants

    International Nuclear Information System (INIS)

    Kohno, Tadaaki

    1986-01-01

    Following the increase of nuclear power plants, the total radiation exposure dose accompanying inspection and maintenance works tended to increase. Japan Power Engineering and Inspection Corp. carried out the verification test of a practical power reactor automatic inspection system from November, 1981, to March, 1986, and in this report, the state of having carried out this verification test is described. The objects of the verification test were the equipment which is urgently required for reducing radiation exposure dose, the possibility of realization of which is high, and which is important for ensuring the safety and reliability of plants, that is, an automatic ultrasonic flaw detector for the welded parts of bend pipes, an automatic disassembling and inspection system for control rod driving mechanism, a fuel automatic inspection system, and automatic decontaminating equipments for steam generator water chambers, primary system crud and radioactive gas in coolant. The results of the verification test of these equipments were judged as satisfactory, therefore, the application to actual plants is possible. (Kako, I.)

  2. Apparatus and method for heat-run test on high-power PWM ...

    Indian Academy of Sciences (India)

    Due to its bi-directional power flow capability, this is used in a ..... generation, and selection of controller parameters for the voltage and current loops is presented ..... For example, the total power consumed for heat-run test on converters at a.

  3. Test results for cables used in nuclear power plants by a new environmental testing method

    Energy Technology Data Exchange (ETDEWEB)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-12-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10/sup 8/ Rad ..gamma..-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, ..gamma..-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation.

  4. Powerful Tests for Multi-Marker Association Analysis Using Ensemble Learning.

    Directory of Open Access Journals (Sweden)

    Badri Padhukasahasram

    Full Text Available Multi-marker approaches have received a lot of attention recently in genome wide association studies and can enhance power to detect new associations under certain conditions. Gene-, gene-set- and pathway-based association tests are increasingly being viewed as useful supplements to the more widely used single marker association analysis which have successfully uncovered numerous disease variants. A major drawback of single-marker based methods is that they do not look at the joint effects of multiple genetic variants which individually may have weak or moderate signals. Here, we describe novel tests for multi-marker association analyses that are based on phenotype predictions obtained from machine learning algorithms. Instead of assuming a linear or logistic regression model, we propose the use of ensembles of diverse machine learning algorithms for prediction. We show that phenotype predictions obtained from ensemble learning algorithms provide a new framework for multi-marker association analysis. They can be used for constructing tests for the joint association of multiple variants, adjusting for covariates and testing for the presence of interactions. To demonstrate the power and utility of this new approach, we first apply our method to simulated SNP datasets. We show that the proposed method has the correct Type-1 error rates and can be considerably more powerful than alternative approaches in some situations. Then, we apply our method to previously studied asthma-related genes in 2 independent asthma cohorts to conduct association tests.

  5. Power cycling test of a 650 V discrete GaN-on-Si power device with a laminated packaging embedding technology

    DEFF Research Database (Denmark)

    Song, Sungyoung; Munk-Nielsen, Stig; Uhrenfeldt, Christian

    2017-01-01

    A GaN-on-Si power device is a strong candidate to replace power components based on silicon in high-end market for low-voltage applications, thanks to its electrical characteristics. To maximize opportunities of the GaN device in field applications, a package technology plays an important role...... in a discrete GaN power device. A few specialized package technologies having very lower stray inductance and higher thermal conductivity have been proposed for discrete GaN-on-Si power devices. Despite their superior performance, there has been little discussion of their reliability. The paper presents a power...... cycling test of a discrete GaN power device employing a laminated embedded packaging technology subjected to 125 degrees Celsius junction temperature swing. Failure modes are described with collected electrical characteristics and measured temperature data under the test. In conclusion, physical...

  6. Operational Performance and Improvements to the RF Power Sources for the Compact Linear Collider Test Facility (CTF3) at CERN

    OpenAIRE

    McMonagle, Gerard

    2006-01-01

    The CERN CTF3 facility is being used to test and demonstrate key technical issues for the CLIC (Compact Linear Collider) study. Pulsed RF power sources are essential elements in this test facility. Klystrons at S-band (29998.55 GHz), in conjunction with pulse compression systems, are used to power the Drive Beam Accelerator (DBA) to achieve an electron beam energy of 150 MeV. The L-Band RF system, includes broadband Travelling Wave Tubes (TWTs) for beam bunching with 'phase coded' sub pulses ...

  7. Lawrence Berkeley laboratory neutral-beam engineering test facility power-supply system

    International Nuclear Information System (INIS)

    Lutz, I.C.; Arthur, C.A.; deVries, G.J.; Owren, H.M.

    1981-10-01

    The Lawrence Berkeley Laboratory is upgrading the neutral beam source test facility (NBSTF) into a neutral beam engineering test facility (NBETF) with increased capabilities for the development of neutral beam systems. The NBETF will have an accel power supply capable of 170 kV, 70 A, 30 sec pulse length, 10% duty cycle; and the auxiliary power supplies required for the sources. This paper describes the major components, their ratings and capabilities, and the flexibility designed to accomodate the needs of source development

  8. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  9. Power ramp tests of high burnup BWR segment rods

    International Nuclear Information System (INIS)

    Hayashi, H.; Etoh, Y.; Tsukuda, Y.; Shimada, S.; Sakurai, H.

    2002-01-01

    Lead use assemblies (LUAs) of high burnup 8x8 fuel design for Japanese BWRs were irradiated up to 5 cycles in Fukushima Daini Nuclear Power Station No. 2 Unit. Segment rods were installed in LUAs and used for power ramp tests in Japanese Material Test Reactor (JMTR). Post irradiation examinations (PIEs) of segment rods were carried out at Nippon Nuclear Fuel Development Co., Ltd. before and after ramp tests. Maximum linear heat rates of LUAs were kept above 300 W/cm in the first cycle, above 250 W/cm in the second and third cycles and decreased to 200 W/cm in the fourth cycle and 80 W/cm in the fifth cycle. The integrity of high burnup 8x8 fuel was confirmed up to the bundle burnup of 48 GWd/t after 5 cycles of irradiation. Systematic and high quality data were collected through detailed PIEs. The main results are as follows. The oxide on the outer surface of cladding tubes was uniform and its thickness was less than 20 micro-meter after 5 cycles of irradiation and was almost independent of burnup. Hydrogen contents in cladding tubes were less than 150 ppm after 5 cycles of irradiation, although hydrogen contents increased during the fourth and fifth irradiation cycles. Mechanical properties of cladding tubes were on the extrapolated line of previous data up to 5 cycles of irradiation. Fission gas release rates were in the low level (mainly less than 6%) up to 5 cycles of irradiation due to the design to decrease pellet temperature. Pellet-cladding bonding layers were observed after the third cycle and almost full bonding was observed after the fifth cycle. Pellet volume increased with burnup in proportion to solid swelling rate up to the forth cycle. After the fifth cycle, slightly higher pellet swelling was confirmed. Power ramp tests were carried out and satisfactory performance of Zr-lined cladding tube was confirmed up to 60 GWd/t (segment average burnup). One segment rod irradiated for 3 cycles failed by a single step ramp test at terminal ramp power of 614 W

  10. High Peak Power Test and Evaluation of S-band Waveguide Switches

    Science.gov (United States)

    Nassiri, A.; Grelick, A.; Kustom, R. L.; White, M.

    1997-05-01

    The injector and source of particles for the Advanced Photon Source is a 2856-MHz S-band electron-positron linear accelerator (linac) which produces electrons with energies up to 650 MeV or positrons with energies up to 450 MeV. To improve the linac rf system availability, an additional modulator-klystron subsystem is being constructed to provide a switchable hot spare unit for each of the five exsisting S-band transmitters. The switching of the transmitters will require the use of SF6-pressurized S-band waveguide switches at a peak operating power of 35 MW. Such rf switches have been successfully operated at other accelerator facilities but at lower peak powers. A test stand has been set up at the Stanford Linear Accelerator Center (SLAC) Klystron Factory to conduct tests comparing the power handling characteristics of two WR-284 and one WR-340 switches. Test results are presented and their implications for the design of the switching system are discussed.

  11. Development and Testing of a Prototype Grid-Tied Photovoltaic Power System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2009-01-01

    The NASA Glenn Research Center (GRC) has developed and tested a prototype 2 kW DC grid-tied photovoltaic (PV) power system at the Center. The PV system has generated in excess of 6700 kWh since operation commenced in July 2006. The PV system is providing power to the GRC grid for use by all. Operation of the prototype PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the prototype PV system, additional PV power system expansion at GRC is under consideration. The prototype grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.

  12. 75 FR 76727 - Evergreen Wind Power III, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2010-12-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2201-000] Evergreen Wind Power III, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for... proceeding of Evergreen Wind Power III, LLC's application for market-based rate authority, with an...

  13. 76 FR 79169 - Power Network New Mexico, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2011-12-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-605-000] Power Network New Mexico, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Power Network New Mexico, LLC's application for market-based rate authority, with an accompanying rate...

  14. Testing of adsorbents used in nuclear power plant air cleaning systems using the open-quotes Newclose quotes standards

    International Nuclear Information System (INIS)

    Freeman, W.P.

    1993-01-01

    Ever since the publication of the NRC Information Notice No. 87-32: Deficiencies in the Testing of Nuclear-Grade Activated Charcoal, nuclear power facilities in the US have struggled in their efforts to open-quotes...review the information for applicability to their facilities and consider action, if appropriate ...close quotes as stated in the notice. The encouragement of resident NRC inspectors at some nuclear power facilities has prompted a variety of responses ranging from no change at all in testing requirements to contemplated changes in plant technical specifications. This confusion is the result of a couple factors. The first factor is the lack of a current revision to NRC Regulatory Guide 1.52, the basic document used in nuclear power plant technical specifications for the testing of engineered-safety feature (ESF) post accident air cleaning systems. The second factor is the standards that have been written since the last revision of Reg. Guide 1.52 which include two revision of ANSI N509 and N510, two revisions of RDT M16-1T, two version of ASTM D3803, two versions of ASTM D4069, and three versions of an SME code AG-1. Few of the standards and codes listed above are commensurate with each other and, thus, present a nearly insolvable maze to the HVAC engineer asked to upgrade adsorbent testing requirements following the standards. This paper describes the authors experience with a number of nuclear power facilities in their efforts to meet the requirements of the new standards of testing adsorbents from nuclear power plant air cleaning systems. The existing standards are discussed in light of the current state of the art for adsorbent testing of adsorbent media from nuclear air treatment systems. Test results are presented showing the impact of new test requirements on acceptance criteria when compared to the old test requirements and recommendations are offered for solution of this testing problem in the future. 12 refs., 5 tabs

  15. Control rod position and temperature coefficients in HTTR power-rise tests. Interim report

    International Nuclear Information System (INIS)

    Fujimoto, Nozomu; Nojiri, Naoki; Takada, Eiji; Saito, Kenji; Kobayashi, Shoichi; Sawahata, Hiroaki; Kokusen, Sigeru

    2001-03-01

    Power-rise tests of the High Temperature Engineering Test Reactor (HTTR) have been carried out aiming to achieve 100% power. So far, 50% of power operation and many tests have been carried out. In the HTTR, temperature change in core is so large to achieve the outlet coolant temperature of 950degC. To improve the calculation accuracy of the HTTR reactor physics characteristics, control rod positions at criticality and temperature coefficients were measured at each step to achieve 50% power level. The calculations were carried out using Monte Carlo code and diffusion theory with temperature distributions in the core obtained by reciprocal calculation of thermo-hydraulic code and diffusion theory. Control rod positions and temperature coefficients were calculated by diffusion theory and Monte Carlo method. The test results were compared to calculation results. The control rod positions at criticality showed good agreement with calculation results by Monte Carlo method with error of 50 mm. The control position at criticality at 100% was predicted around 2900mm. Temperature coefficients showed good agreement with calculation results by diffusion theory. The improvement of calculation will be carried out comparing the measured results up to 100% power level. (author)

  16. Approaching Repetitive Short Circuit Tests on MW-Scale Power Modules by means of an Automatic Testing Setup

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Wang, Huai; Iannuzzo, Francesco

    2016-01-01

    An automatic testing system to perform repetitive short-circuit tests on megawatt-scale IGBT power modules is pre-sented and described in this paper, pointing out the advantages and features of such testing approach. The developed system is based on a non-destructive short-circuit tester, which has...

  17. Reducing test-data volume and test-power simultaneously in LFSR reseeding-based compression environment

    Energy Technology Data Exchange (ETDEWEB)

    Wang Weizheng; Kuang Jishun; You Zhiqiang; Liu Peng, E-mail: jshkuang@163.com [College of Information Science and Engineering, Hunan University, Changsha 410082 (China)

    2011-07-15

    This paper presents a new test scheme based on scan block encoding in a linear feedback shift register (LFSR) reseeding-based compression environment. Meanwhile, our paper also introduces a novel algorithm of scan-block clustering. The main contribution of this paper is a flexible test-application framework that achieves significant reductions in switching activity during scan shift and the number of specified bits that need to be generated via LFSR reseeding. Thus, it can significantly reduce the test power and test data volume. Experimental results using Mintest test set on the larger ISCAS'89 benchmarks show that the proposed method reduces the switching activity significantly by 72%-94% and provides a best possible test compression of 74%-94% with little hardware overhead. (semiconductor integrated circuits)

  18. Thermal neutron measurement using the instrumented test bundle and assessment of maximum linear power in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C. S.; Seo, C. K.; Lee, B. C.; Kim, H. N.; Kang, B. W. [KAERI, Taejon (Korea, Republic of)

    2000-10-01

    The HANARO fuel, U{sub 3}Si-Al, has been developed by AECL and tested in NRU reactor. Due to the lack of the data performed under the high power, the repetitive conduct of the irradiation test was required under the power greater than 108kW/m, which is the estimated maximum linear power in the design stage. Accordingly, the instrumented test bundle with SPND(Self Powered Neutron Detector) was fabricated and its irradiation test was performed in IR2 of HANARO. The measured thermal neutron flux with SPND is compared with calculation results by HANAFMS(HANARO Fuel Management System). The difference in the measured and calculated thermal flux values are below {+-}11% and the accuracy of the linear power predicted by HANAFMS is consequently accompanied. Therefore, it is believed that the maximum linear power above 120kW/m is achieved during the irradiation test of the test bundle.

  19. 77 FR 42301 - W Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

    Science.gov (United States)

    2012-07-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2219-000] W Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of W Power, LLC's application...

  20. Test results for cables used in nuclear power plants by a new environmental testing method

    International Nuclear Information System (INIS)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-01-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10 8 Rad γ-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, γ-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation. (Wakatsuki, Y.)

  1. Power and sample size evaluation for the Cochran-Mantel-Haenszel mean score (Wilcoxon rank sum) test and the Cochran-Armitage test for trend.

    Science.gov (United States)

    Lachin, John M

    2011-11-10

    The power of a chi-square test, and thus the required sample size, are a function of the noncentrality parameter that can be obtained as the limiting expectation of the test statistic under an alternative hypothesis specification. Herein, we apply this principle to derive simple expressions for two tests that are commonly applied to discrete ordinal data. The Wilcoxon rank sum test for the equality of distributions in two groups is algebraically equivalent to the Mann-Whitney test. The Kruskal-Wallis test applies to multiple groups. These tests are equivalent to a Cochran-Mantel-Haenszel mean score test using rank scores for a set of C-discrete categories. Although various authors have assessed the power function of the Wilcoxon and Mann-Whitney tests, herein it is shown that the power of these tests with discrete observations, that is, with tied ranks, is readily provided by the power function of the corresponding Cochran-Mantel-Haenszel mean scores test for two and R > 2 groups. These expressions yield results virtually identical to those derived previously for rank scores and also apply to other score functions. The Cochran-Armitage test for trend assesses whether there is an monotonically increasing or decreasing trend in the proportions with a positive outcome or response over the C-ordered categories of an ordinal independent variable, for example, dose. Herein, it is shown that the power of the test is a function of the slope of the response probabilities over the ordinal scores assigned to the groups that yields simple expressions for the power of the test. Copyright © 2011 John Wiley & Sons, Ltd.

  2. HIGH POWER TESTS OF A MULTIMODE X-BAND RF DISTRIBUTION SYSTEMS

    International Nuclear Information System (INIS)

    Tantawi, S

    2004-01-01

    We present a multimode X-band rf pulse compression system suitable for the Next Linear Collider (NLC). The NLC main linacs operate at 11.424 GHz. A single NLC rf unit is required which produce 400 ns pulses with 600 MW of peak power. Each rf unit should power approximately 5 meters of accelerator structures. These rf units consist of two 75 MW klystrons and a dual-moded resonant delay line pulse compression system [1] that produce a flat output pulse. The pulse compression system components are all over moded and most components are design to operate with two modes at the same time. This approach allows increasing the power handling capabilities of the system while maintain a compact inexpensive system. We detail the design of this system and present experimental cold test results. The high power testing of the system is verified using four 50-MW solenoid focused klystrons. These Klystrons should be able to push the system beyond NLC requirements

  3. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Van Ness, H.W.

    1979-01-01

    A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

  4. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Seichter, Johannes [Siempelkamp Pruef- und Gutachter-Gesellschaft mbH, Dresden (Germany); Reese, Sven H.; Klucke, Dietmar [E.ON Kernkraft GmbH, Hannover (Germany). Component Technology

    2013-06-01

    The influence of LWR coolant environment to the lifetime of materials in nuclear power plants is being discussed internationally. Environmental phenomena had been investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures are discussed and recommendations are made how to avoid extremely conservative results. (orig.)

  5. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  6. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  7. Power Burst Facility Severe Fuel Damage test series

    International Nuclear Information System (INIS)

    Buescher, B.J.; Osetek, D.J.; Ploger, S.A.

    1982-01-01

    The Severe Fuel Damage (SFD) tests planned for the Power Burst Facility (PBF) are described. Bundles containing 32 zircaloy-clad, PWR-type fuel rods will be subjected to severe overheating transients in a high-pressure, superheated-steam environment. Cladding temperatures are expected to reach 2400 0 K, resulting in cladding ballooning and rupture, severe cladding oxidation, cladding melting, fuel dissolution, fuel rod fragmentation, and possibly, rubble bed formation. An experiment effluent collection system is being installed and the PBF fission product monitoring system is being upgraded to meet the special requirements of the SFD tests. Scoping calculations were performed to evaluate performance of the SFD test design and to establish operational requirements for the PBF loop

  8. Power properties of invariant tests for spatial autocorrelation in linear regression

    NARCIS (Netherlands)

    Martellosio, F.

    2006-01-01

    Many popular tests for residual spatial autocorrelation in the context of the linear regression model belong to the class of invariant tests. This paper derives a number of exact properties of the power function of such tests. In particular, we extend the work of Krämer (2005, Journal of Statistical

  9. On-line test of power distribution prediction system for boiling water reactors

    International Nuclear Information System (INIS)

    Nishizawa, Y.; Kiguchi, T.; Kobayashi, S.; Takumi, K.; Tanaka, H.; Tsutsumi, R.; Yokomi, M.

    1982-01-01

    A power distribution prediction system for boiling water reactors has been developed and its on-line performance test has proceeded at an operating commercial reactor. This system predicts the power distribution or thermal margin in advance of control rod operations and core flow rate change. This system consists of an on-line computer system, an operator's console with a color cathode-ray tube, and plant data input devices. The main functions of this system are present power distribution monitoring, power distribution prediction, and power-up trajectory prediction. The calculation method is based on a simplified nuclear thermal-hydraulic calculation, which is combined with a method of model identification to the actual reactor core state. It has been ascertained by the on-line test that the predicted power distribution (readings of traversing in-core probe) agrees with the measured data within 6% root-mean-square. The computing time required for one prediction calculation step is less than or equal to 1.5 min by an HIDIC-80 on-line computer

  10. Results of VVER fuel rods tests in the MIR.M1 reactor under power cycling conditions

    International Nuclear Information System (INIS)

    Burukin, A.; Izhutov, A.; Ovchinnikov, V.; Kalygin, V.; Markov, D.; Pimenov, Y.; Novikov, V.; Medvedev, A.; Nesterov, B.

    2011-01-01

    The paper presents the main results of the 50 ... 60 MWd/kgU burnup VVER fuel rods tests performed in the MIR.M1 reactor loop facilities under power cycling. The non-destructive PIE results are presented as well. A series of experiments was performed, including overall measurement of fuel rod parameters test, in one of which 300 cycles were done. Irradiation under power cycling conditions and PIE of high-burnup VVER fuel rods showed the following: 1) all fuel rods claddings preserved their integrity under irradiation at linear heat rate (LHR) higher than the NPP operating one; 2) experimental data were obtained on the axial and radial cladding strain and fission gas release (FGR) from 50 ... 60 MWd/kgU burnup VVER-440 and VVER-1000 fuel rods as well as on the kinetics of the change in these parameters and fuel temperature under the power cycling; 3) non-destructive PIE results are in a satisfactory correlation with the data obtained by means of in-pile measurement gages during irradiation. (authors)

  11. In situ testing of the Shippingport Atomic Power Station electrical circuits

    International Nuclear Information System (INIS)

    Dinsel, M.R.; Donaldson, M.R.; Soberano, F.T.

    1987-04-01

    This report discusses the results of electrical in situ testing of selected circuits and components at the Shippingport Atomic Power Station in Shippingport, Pennsylvania. Testing was performed by EG and G Idaho in support of the United States Nuclear Regulatory Commission (USNRC) Nuclear Plant Aging Research (NPAR) Program. The goal was to determine the extent of aging or degradation of various circuits from the original plant, and the two major coreplant upgrades (representing three distinct age groups), as well as to evaluate previously developed surveillance technology. The electrical testing was performed using the Electrical Circuit Characterization and Diagnostic (ECCAD) system developed by EG and G for the US Department of Energy to use at TMI-2. Testing included measurements of voltage, effective series capacitance, effective series inductance, impedance, effective series resistance, dc resistance, insulation resistance and time domain reflectometry (TDR) parameters. The circuits evaluated included pressurizer heaters, control rod position indicator cables, miscellaneous primary system Resistance Temperature Detectors (RTDs), nuclear instrumentation cables, and safety injection system motor operated valves. It is to be noted that the operability of these circuits was tested after several years had elapsed because plant operations had concluded at Shippingport. There was no need following plant shutdown to retain the circuits in working condition, so no effort was expended for that purpose. The in situ measurements and analysis of the data confirmed the effectiveness of the ECCAD system for detecting degradation of circuit connections and splices because of high resistance paths, with most of the problems caused by corrosion. Results indicate a correlation between the chronological age of circuits and circuit degradation

  12. Low power test architecture for dynamic read destructive fault detection in SRAM

    Science.gov (United States)

    Takher, Vikram Singh; Choudhary, Rahul Raj

    2018-06-01

    Dynamic Read Destructive Fault (dRDF) is the outcome of resistive open defects in the core cells of static random-access memories (SRAMs). The sensitisation of dRDF involves either performing multiple read operations or creation of number of read equivalent stress (RES), on the core cell under test. Though the creation of RES is preferred over the performing multiple read operation on the core cell, cell dissipates more power during RES than during the read or write operation. This paper focuses on the reduction in power dissipation by optimisation of number of RESs, which are required to sensitise the dRDF during test mode of operation of SRAM. The novel pre-charge architecture has been proposed in order to reduce the power dissipation by limiting the number of RESs to an optimised number of two. The proposed low power architecture is simulated and analysed which shows reduction in power dissipation by reducing the number of RESs up to 18.18%.

  13. Preliminary reactor physics calculations for Exxon LWR fuel testing in the power burst facility

    International Nuclear Information System (INIS)

    Olson, W.O.; Nigg, D.W.

    1981-05-01

    The PFB reactor is being considered as an irradiation facility to test LWR fuel rods for Exxon Nuclear Company. Requested test conditions are 18 kW/ft axial peak steady state power in 2.5% initial enrichment, 20,000 MWd/Tu exposed rods. Multigroup transport theory calculations (S/sub n/ and Monte Carlo) showed that this was unattainable in the standard PBF test loop. Thus, a flux multiplier was developed in the form of a Zr-2-clad 0.15-inch thick cylindrical shell of 35% enriched, 88% T.D. UO 2 replacing the flow divider, surrounding the rod within the in-pile tube in PFB. With this flux multiplier installed and assuming an average water density of 0.86 g/cm 3 within the test loop, a Figure of Merit (FOM) for a single-rod test assembly of 0.86 kW/ft-MW +- 5% (at 95% confidence level) was calculated. This FOM is the axial peak linear test rod power per megawatt of reactor power. A reactor power of about 21 megawatts will therefore be required to supply the requested linear test rod axial peak heating rate of 18 kW/ft

  14. Testing in power plant construction as well as in the petrochemical and chemical industry

    International Nuclear Information System (INIS)

    Riess, N.; Schittko, H.

    1978-01-01

    In general, the upgrading of requirements for the most different fields of engineering is also characterized by a corresponding effort in testing. In this context especially nondestructive tests of materials are of outstanding importance. In the fields of power plant construction (among others, components for nuclear power plants) as well as petrochemical and chemical industry considered here, almost all nondestructive test methods are applied. This paper discusses not so much theoretical testing problems, but rather test objects as well as specifications and testing equipment. (orig./HP) [de

  15. Results of the power-up test of the nuclear-powered ship MUTSU and test programs of her experimental voyages

    International Nuclear Information System (INIS)

    Ochiai, Masa-aki; Ishida, Toshihisa; Itagaki, Masafumi; Sakamoto, Yukio; Kyouya, Masahiko

    1991-01-01

    The power-up test of N.S. MUTSU was performed successfully almost on schedule in spite of minor troubles resolved in a short time, and the results of various areas were satisfactory. The official sea trial was well carried out. Then, the ship was officially designated the first nuclear ship in Japan. Experimental voyages are to be performed to yield profitable data for further research on nuclear ships in the future. (author)

  16. Quality assurance and non-destructive testing for nuclear power plants

    International Nuclear Information System (INIS)

    Manlucu, F.A.

    1991-01-01

    This article discussed the quality assurance requirements which have been extensively applied in plant design, fabrication, construction and operation and has played a major role in the excellent safety record of nuclear power plants. The application of non-destructive testing techniques, plays a very important role during the in-service inspection (ISI) in order to prevent dangerous accident and to assure continuous safe operation of nuclear power plants. (IMA). 12 refs

  17. A Note on Comparing the Power of Test Statistics at Low Significance Levels.

    Science.gov (United States)

    Morris, Nathan; Elston, Robert

    2011-01-01

    It is an obvious fact that the power of a test statistic is dependent upon the significance (alpha) level at which the test is performed. It is perhaps a less obvious fact that the relative performance of two statistics in terms of power is also a function of the alpha level. Through numerous personal discussions, we have noted that even some competent statisticians have the mistaken intuition that relative power comparisons at traditional levels such as α = 0.05 will be roughly similar to relative power comparisons at very low levels, such as the level α = 5 × 10 -8 , which is commonly used in genome-wide association studies. In this brief note, we demonstrate that this notion is in fact quite wrong, especially with respect to comparing tests with differing degrees of freedom. In fact, at very low alpha levels the cost of additional degrees of freedom is often comparatively low. Thus we recommend that statisticians exercise caution when interpreting the results of power comparison studies which use alpha levels that will not be used in practice.

  18. Final Test of the W7-X Control Coils Power Supply and its Integration into the Overall Control Environment

    International Nuclear Information System (INIS)

    Fuellenbach, F.; Rummel, T.; Pingel, S.; Laqua, H.; Mueller, I.; Jauregi, E.

    2006-01-01

    In order to be able to vary the magnetic configuration of WENDELSTEIN 7-X (W7-X) at the plasma edge and allow sweeping of the power across the divertor target plates 10 '' control coils '' are installed inside the plasma vessel behind the baffle plates of the divertor. The coils are made of a hollow copper profile with eight turns each. The dimensions of the coils are 2,05 m x 0,35 m x 0,35 m with a three dimensional shape to fit into the narrow space between the baffles and the wall of the plasma vessel. Each of the ten coils is supplied by independent power supplies each providing bi-directionally a direct current of 2500 A with high accuracy and low ripple. To allow sweeping the power deposition from the plasma across the target plates the power supplies provide an alternating current of up to 625 A with frequencies up to 20 Hz which is synchronised between the ten supplies in order to maintain the symmetry of the magnetic field. The total output current of a power supply is a superposition of a direct current and an alternating current, where both parts have to be independently adjustable. JEMA, Spain provided the complete set of power supplies which are based on 10 independent four-quadrant power supplies with a link rectifier and includes a cooling water unit, a dedicated distribution and a central control and visualization system. All ten power supply units and auxiliary systems have meanwhile been installed and finally tested at the W7-X site in Greifswald. The paper focuses on the results of the final tests and measures to integrate the power supply system to the overall control system including the central PLC and PC's for experiment control, data acquisition- and security systems. (author)

  19. Software Sub-system in Loading Automatic Test System for the Measurement of Power Line Filters

    Directory of Open Access Journals (Sweden)

    Yu Bo

    2017-01-01

    Full Text Available The loading automatic test system for measurement of power line filters are in urgent demand. So the software sub-system of the whole test system was proposed. Methods: structured the test system based on the virtual instrument framework, which consisted of lower and up computer and adopted the top down approach of design to perform the system and its modules, according to the measurement principle of the test system. Results: The software sub-system including human machine interface, data analysis and process software, expert system, communication software, control software in lower computer, etc. had been designed. Furthermore, it had been integrated into the entire test system. Conclusion: This sub-system provided a fiendly software platform for the whole test system, and had many advantages such as strong functions, high performances, low prices. It not only raises the test efficiency of EMI filters, but also renders some creativities.

  20. Field testing of a 1,300MVA turbine generator for the Oi nuclear-power station

    International Nuclear Information System (INIS)

    Inoue, Toshiaki; Tajiri, Yoshiaki; Ito, Hiroyuki; Fukuda, Mitsuo.

    1980-01-01

    The first Mitsubishi 1,300MVA turbine generator for this power station was put into commercial operation in March 1979, and the second unit in December of that year. The turbine generators use new technology in a variety of areas, including the cooling system, to achieve great increases in capacity over previously designed generators, and are destined to become the worldwide standard for large-scale generators of this type. Valuable experience was gained in the installation and testing of the generators. The outline of the tests performed on the generators with respect to heating and vibration are described in the article. (author)

  1. Performance Evaluation and Quality Assurance Management during the Series Power Tests of LHC Main Lattice Magnets

    CERN Document Server

    Siemko, A

    2008-01-01

    Within the LHC magnet program a series production of superconducting dipoles and quadrupoles has recently been completed in industry and all magnets were cold tested at CERN. The main features of these magnets are: two-in-one structure, 56 mm aperture, two layer coils wound from 15.1 mm wide Nb-Ti cables, and all-polyimide insulation. This paper reviews the process of the power test quality assurance and performance evaluation, which was applied during the LHC magnet series tests. The main test results of magnets tested in both supercritical and superfluid helium, including the quench training, the conductor performance, the magnet protection efficiency and the electrical integrity are presented and discussed in terms of the design parameters and the requirements of the LHC project.

  2. Special power supply and control system for the gas-cooled fast reactor-core flow test loop

    International Nuclear Information System (INIS)

    Hudson, T.L.

    1981-09-01

    The test bundle in the Gas-Cooled Fast Reactor-Core Flow Test Loop (GCFR-CFTL) requires a source of electrical power that can be controlled accurately and reliably over a wide range of steady-state and transient power levels and skewed power distributions to simulate GCFR operating conditions. Both ac and dc power systems were studied, and only those employing silicon-controlled rectifiers (SCRs) could meet the requirements. This report summarizes the studies, tests, evaluations, and development work leading to the selection. it also presents the design, procurement, testing, and evaluation of the first 500-kVa LMPL supply. The results show that the LMPL can control 60-Hz sine wave power from 200 W to 500 kVA

  3. Transient and steady-state tests of the space power research engine with resistive and motor loads

    Science.gov (United States)

    Rauch, Jeffrey S.; Kankam, M. David

    1995-01-01

    The NASA Lewis Research Center (LeRC) has been testing free-piston Stirling engine/linear alternators (FPSE/LA) to develop advanced power convertors for space-based electrical power generation. Tests reported herein were performed to evaluate the interaction and transient behavior of FPSE/LA-based power systems with typical user loads. Both resistive and small induction motor loads were tested with the space power research engine (SPRE) power system. Tests showed that the control system could maintain constant long term voltage and stable periodic operation over a large range of engine operating parameters and loads. Modest resistive load changes were shown to cause relatively large voltage and, therefore, piston and displacer amplitude excursions. Starting a typical small induction motor was shown to cause large and, in some cases, deleterious voltage transients. The tests identified the need for more effective controls, if FPSE/LAs are to be used for stand-alone power systems. The tests also generated a large body of transient dynamic data useful for analysis code validation.

  4. Transient and Steady-state Tests of the Space Power Research Engine with Resistive and Motor Loads

    Science.gov (United States)

    Rauch, Jeffrey S.; Kankam, M. David

    1995-01-01

    The NASA Lewis Research Center (LeRC) has been testing free-piston Stirling engine/linear alternators (FPSE/LA) to develop advanced power convertors for space-based electrical power generation. Tests reported herein were performed to evaluate the interaction and transient behavior of FPSE/LA-based power systems with typical user loads. Both resistive and small induction motor loads were tested with the space power research engine (SPRE) power system. Tests showed that the control system could maintain constant long term voltage and stable periodic operation over a large range of engine operating parameters and loads. Modest resistive load changes were shown to cause relatively large voltage and, therefore, piston and displacer amplitude excursions. Starting a typical small induction motor was shown to cause large and, in some cases, deleterious voltage transients. The tests identified the need for more effective controls, if FPSE/LAs are to be used for stand-alone power systems. The tests also generated a large body of transient dynamic data useful for analysis code validation.

  5. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    International Nuclear Information System (INIS)

    Seichter, Johannes; Reese, Sven H.; Klucke, Dietmar

    2013-01-01

    The influence of LWR coolant environment to the lifetime of materials in Nuclear Power Plants is in discussion internationally. Environmental phenomena were investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures like the so called 'Strain-integrated Method' and 'Simplified Approach' have been published while each approach yields to different results. The recent revision of the calculation procedure, proposed by ANL in 2012, is presented and discussed with regard to possible variations in the results depending on the assumptions made. In German KTA Rules the effect of environmentally assisted fatigue (EAF) is taken into account by means of so called attention thresholds. If the threshold value is exceeded, further measures like NDT, in-service inspections including fracture mechanical evaluations or detailed assessment procedures have to be performed. One way to handle those measures is to apply sophisticated procedures and to show that the calculated CUF is below the defined attention thresholds. On the basis of a practical example, methods and approaches will be discussed and recommendations in terms of avoiding over-conservatism and misinterpretation will be presented.

  6. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Seichter, Johannes [Siempelkamp Pruef- und Gutachter-Gesellschaft mbH, Dresden (Germany); Reese, Sven H.; Klucke, Dietmar [Component Technology Global Unit Generation, E.ON Kernkraft GmbH, Hannover (Germany)

    2013-05-15

    The influence of LWR coolant environment to the lifetime of materials in Nuclear Power Plants is in discussion internationally. Environmental phenomena were investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures like the so called 'Strain-integrated Method' and 'Simplified Approach' have been published while each approach yields to different results. The recent revision of the calculation procedure, proposed by ANL in 2012, is presented and discussed with regard to possible variations in the results depending on the assumptions made. In German KTA Rules the effect of environmentally assisted fatigue (EAF) is taken into account by means of so called attention thresholds. If the threshold value is exceeded, further measures like NDT, in-service inspections including fracture mechanical evaluations or detailed assessment procedures have to be performed. One way to handle those measures is to apply sophisticated procedures and to show that the calculated CUF is below the defined attention thresholds. On the basis of a practical example, methods and approaches will be discussed and recommendations in terms of avoiding over-conservatism and misinterpretation will be presented.

  7. Radiation monitoring for the HTTR rise-to-power test (1) and (2)'

    Energy Technology Data Exchange (ETDEWEB)

    Nakazawa, Takashi; Yoshino, Toshiaki; Yasu, Katsuji; Ashikagaya, Yoshinobu; Kikuchi, Toshiki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2001-02-01

    The High Temperature Engineering Test Reactor (HTTR) is the first high temperature gas-cooled research reactor in Japan. This reactor is a helium-gas-cooled and graphite-moderated reactor with a thermal output of 30 MW. The rated operation temperature of the outlet coolant is 850degC. (During high temperature test operation, this reaches 950degC). The first criticality of the HTTR was attained in November 1998. The single loaded, parallel loaded operation with a thermal output of 9 MW (called the HTTR Rise-to-Power Test (1)) was completed between September 16, 1999 and July 8, 2000. The single loaded, parallel loaded continuous operation with a thermal output of 20 MW (called the HTTR Rise-to-Power Test (2)) has also been carried out, but it was shutdown at the halfway stage by a single from the reactor, when the thermal output was 16.5 MW and the reactor outlet coolant temperature was 500degC. This report describes the radiation monitoring carried out during the HTTR Rise-to-Power Tests (1) and (2)'. The data measured by the various radiation monitors is also reported. These data will be used for the estimation of radiation levels (such as the radiation dose equivalent rate, the radioactive concentration in effluents, etc.) for the next HTTR Rise-to-Power Test, and for periodic inspections. (author)

  8. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-11-08

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision to regulatory guide; issuance..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... Operators Installed Inside the Containment of Nuclear Power Plants,'' dated January 1974. ADDRESSES: Please...

  9. An investigation of the statistical power of neutrality tests based on comparative and population genetic data

    DEFF Research Database (Denmark)

    Zhai, Weiwei; Nielsen, Rasmus; Slatkin, Montgomery

    2009-01-01

    In this report, we investigate the statistical power of several tests of selective neutrality based on patterns of genetic diversity within and between species. The goal is to compare tests based solely on population genetic data with tests using comparative data or a combination of comparative...... and population genetic data. We show that in the presence of repeated selective sweeps on relatively neutral background, tests based on the d(N)/d(S) ratios in comparative data almost always have more power to detect selection than tests based on population genetic data, even if the overall level of divergence...... selection. The Hudson-Kreitman-Aguadé test is the most powerful test for detecting positive selection among the population genetic tests investigated, whereas McDonald-Kreitman test typically has more power to detect negative selection. We discuss our findings in the light of the discordant results obtained...

  10. Testing Header Component of Electricity Power Industry Boiler

    International Nuclear Information System (INIS)

    Soedardjo, S.A; Andryansyah, B; Artahari, Dewi; Natsir, Muhammad; Triyadi, Ari; Farokhi

    2000-01-01

    Testing of header component of Suralaya Unit II electricity power by replication method has been carried out. That header component is cross over pipe which interconnection between Primary and Superheater Outlet Header Secondary Superheater Outlet Header with the operation time over 14 years. The main composition of cross over pipe is 2 1/4 Cr 1 Mo or frequently specified as ferritique steel. The replication testing shown that the damage classification on those cross over pipe in A class based on failure classification from Neubauer and Wedel. Simple calculation in favor of cross over pipe remaining lifetime is about 16.5 years moreover

  11. Serial powering optimization for CMS and ATLAS pixel detectors within RD53 collaboration for HL-LHC: system level simulations and testing

    CERN Document Server

    Orfanelli, Stella; Hamer, Matthias; Hinterkeuser, F; Karagounis, M; Pradas Luengo, Alvaro; Marconi, Sara; Ruini, Daniele

    2017-01-01

    Serial powering is the baseline choice for low mass power distribution for the CMS and ATLAS HL-LHC pixel detectors. Two 2.0 A Shunt-LDO regulators are integrated in a prototype pixel chip implemented in 65-nm CMOS technology and used to provide constant supply voltages to its power domains from a constant input current. Performance results from testing prototype Shunt-LDO regulators are shown, including their behaviour after x-ray irradiation. The system level simulation studies, which had been performed with a detailed regulator design in a serially powered topology, have been validated.

  12. Japanese programme on the development of high duty fuel and related power ramping tests

    International Nuclear Information System (INIS)

    Mishima, Y.

    1983-01-01

    Power ramping tests hitherto planned or carried out in Japan can be classified into two categories: 1) the tests programme by private organizations on fuel behaviour under various conditions of power ramping, in participating international programmes; and 2) a partially government sponsored programme, which was officially inaugurated in 1981 under the title of High-Duty Fuel Development Programme. The latter has been carried out by the Nuclear Power Engineering Test Centre, based on the schedule decided by the MITI Committee (chaired by the author), for a period of 10 years. These programmes will be described with emphasis on the latter (National Programme). (author)

  13. Japanese programme on the development of high duty fuel and related power ramping tests

    Energy Technology Data Exchange (ETDEWEB)

    Mishima, Y

    1983-06-01

    Power ramping tests hitherto planned or carried out in Japan can be classified into two categories: 1) the tests programme by private organizations on fuel behaviour under various conditions of power ramping, in participating international programmes; and 2) a partially government sponsored programme, which was officially inaugurated in 1981 under the title of High-Duty Fuel Development Programme. The latter has been carried out by the Nuclear Power Engineering Test Centre, based on the schedule decided by the MITI Committee (chaired by the author), for a period of 10 years. These programmes will be described with emphasis on the latter (National Programme). (author)

  14. Power ramp tests of MOX fuel rods. HBWR irradiation with the instrument rig, IFA-591

    International Nuclear Information System (INIS)

    Ozawa, Takayuki; Abe, Tomoyuki

    2006-03-01

    Plutonium-uranium mixed oxide (MOX) fuel rods of instrumental rig IFA-591 were ramped in HBWR to study the Advanced Thermal Reactor (ATR) MOX fuel behavior during transient operation and to determine a failure threshold of the MOX fuel rods. Eleven segments were base-irradiated in ATR 'FUGEN' up to 18.4 GWd/t. Zirconium liner claddings were adopted for four segments of them. As the results of non-destructive post irradiation examinations (PIEs) after the base-irradiation and before the ramp tests, no remarkable behavior affecting the integrity of fuel assembly and fuel rod was confirmed. All segments to be used for the ramp tests, which consisted of the multi-step ramp tests and the single-step ramp tests, had instrumentations for in-pile measurements of cladding elongation or plenum pressure, and heated up to the maximum linear power of 58.3-68.4 kW/m without failure. The major results of ramp tests are as follows: There is no difference in PCMI behaviors between two type rods of Zry-2 and Zirconium liner claddings from the in-pile measurements of cladding elongation and plenum pressure. The computations of cladding elongation and inner pressure gave slightly lower elongation and pressure than the in-pile measurements during the ramp-test. However, the cladding relaxation during the power hold was in good agreement, and the fission gas release behavior during cooling down could be evaluated by taking into account the relaxation of contact pressure between pellet and cladding. Although the final power during IFA-591 ramp tests reached the higher linear power than the failure threshold power of UO 2 fuel rods, no indication of fuel failure was observed during the ramp tests. The cladding relaxation due to the creep deformation of the MOX pellets at high temperature could be confirmed at the power steps during the multi-ramp test. The fission gas release due to the emancipation from PCMI stress was observed during the power decreasing. The burn-up dependence could be

  15. Regulatory Guide 1.131: Qualification tests of electric cables, field splices, and connections for light-water-cooled nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Criterion III, ''Design Control,'' of Appendix B, ''Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plant,'' to 10 CFR Part 50, ''Licensing of Production and Utilization Facilities,'' requires that, where a test program is used to verify the adequacy of a specific design feature, it include suitable qualification testing of a prototype unit under the most adverse design conditions. This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification testing of electric cables, field splices, and connections for service in light-water-cooled nuclear power plants to ensure that the cables, field splices, and connections can perform their safety-related functions. The fire test provisions of this guide do not apply to qualification for an installed configuration

  16. Nuclear power in space

    International Nuclear Information System (INIS)

    Anghaie, S.

    2007-01-01

    The development of space nuclear power and propulsion in the United States started in 1955 with the initiation of the ROVER project. The first step in the ROVER program was the KIWI project that included the development and testing of 8 non-flyable ultrahigh temperature nuclear test reactors during 1955-1964. The KIWI project was precursor to the PHOEBUS carbon-based fuel reactor project that resulted in ground testing of three high power reactors during 1965-1968 with the last reactor operated at 4,100 MW. During the same time period a parallel program was pursued to develop a nuclear thermal rocket based on cermet fuel technology. The third component of the ROVER program was the Nuclear Engine for Rocket Vehicle Applications (NERVA) that was initiated in 1961 with the primary goal of designing the first generation of nuclear rocket engine based on the KIWI project experience. The fourth component of the ROVER program was the Reactor In-Flight Test (RIFT) project that was intended to design, fabricate, and flight test a NERVA powered upper stage engine for the Saturn-class lunch vehicle. During the ROVER program era, the Unites States ventured in a comprehensive space nuclear program that included design and testing of several compact reactors and space suitable power conversion systems, and the development of a few light weight heat rejection systems. Contrary to its sister ROVER program, the space nuclear power program resulted in the first ever deployment and in-space operation of the nuclear powered SNAP-10A in 1965. The USSR space nuclear program started in early 70's and resulted in deployment of two 6 kWe TOPAZ reactors into space and ground testing of the prototype of a relatively small nuclear rocket engine in 1984. The US ambition for the development and deployment of space nuclear powered systems was resurrected in mid 1980's and intermittently continued to date with the initiation of several research programs that included the SP-100, Space Exploration

  17. Statistical Tests Black swans or dragon-kings? A simple test for deviations from the power law★

    Science.gov (United States)

    Janczura, J.; Weron, R.

    2012-05-01

    We develop a simple test for deviations from power law tails. Actually, from the tails of any distribution. We use this test - which is based on the asymptotic properties of the empirical distribution function - to answer the question whether great natural disasters, financial crashes or electricity price spikes should be classified as dragon-kings or `only' as black swans.

  18. New Technology for Microfabrication and Testing of a Thermoelectric Device for Generating Mobile Electrical Power

    Science.gov (United States)

    Prasad, Narashimha S.; Taylor, Patrick J.; Trivedi, Sudhir B.; Kutcher, Susan

    2010-01-01

    We report the results of fabrication and testing of a thermoelectric power generation module. The module was fabricated using a new "flip-chip" module assembly technique that is scalable and modular. This technique results in a low value of contact resistivity ( surfaces. Under mild testing, a power of 22 mW/sq cm was obtained from small (electrical power of practical and usable magnitude for remote applications using thermoelectric power generation technologies.

  19. Cause and countermeasure for heat up of HTTR core support plate at power rise tests

    Energy Technology Data Exchange (ETDEWEB)

    Fujimoto, Nozomu; Takada, Eiji; Nakagawa, Shigeaki; Tachibana, Yukio; Kawasaki, Kozo; Saikusa, Akio; Kojima, Takao; Iyoku, Tatuo [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2002-01-01

    HTTR has carried out many kinds of tests as power rise tests in which reactor power rises step by step after attained the first criticality. In the tests, temperature of a core support plate reached higher than expected at each power level, the temperature was expected to be higher than the maximum working temperature at 100% power level. Therefore, tests under the high temperature test operation mode, in which the core flow rate was different, were carried out to predict the temperature at 100% power precisely, and investigate the cause of the temperature rise. From the investigation, it was clear that the cause was gap flow in the core support structure. Furthermore, it was estimated that the temperature of the core support plate rose locally due to change in gap width between the core support plate and a seal plate due to change in core pressure drop. The maximum working temperature of the core support plate was revised. The integrity of core support plate under the revised maximum working temperature condition was confirmed by stress analyses. (author)

  20. Test Results from a Direct Drive Gas Reactor Simulator Coupled to a Brayton Power Conversion Unit

    Science.gov (United States)

    Hervol, David S.; Briggs, Maxwell H.; Owen, Albert K.; Bragg-Sitton, Shannon M.; Godfroy, Thomas J.

    2010-01-01

    Component level testing of power conversion units proposed for use in fission surface power systems has typically been done using relatively simple electric heaters for thermal input. These heaters do not adequately represent the geometry or response of proposed reactors. As testing of fission surface power systems transitions from the component level to the system level it becomes necessary to more accurately replicate these reactors using reactor simulators. The Direct Drive Gas-Brayton Power Conversion Unit test activity at the NASA Glenn Research Center integrates a reactor simulator with an existing Brayton test rig. The response of the reactor simulator to a change in Brayton shaft speed is shown as well as the response of the Brayton to an insertion of reactivity, corresponding to a drum reconfiguration. The lessons learned from these tests can be used to improve the design of future reactor simulators which can be used in system level fission surface power tests.

  1. Components and system tests on the RFX toroidal power supply

    International Nuclear Information System (INIS)

    Toigo, V.; Zanotto, L.; Gaio, E.; Perna, M.; Bordignon, P.; Coffetti, A.; Novaro, R.; Bertolotto, P.; Rinaldi, E.; Villa, G.

    2005-01-01

    The paper deals with the component and system tests performed on the new toroidal power supply system of the RFX experiment. The high technological innovation of the system required a deep experimental characterization and validation campaign; special factory tests were performed on prototypes of single components aimed at verifying the most critical design aspects. Consequently an articulated series of tests were performed, based on a step-by-step approach to achieve the desired coordinate operation of the whole system. The test procedures and the most significant results are described in the paper

  2. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Design Requirements Document (DRD)

    Science.gov (United States)

    Rigo, H. S.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Bents, D. J.; Hatch, A. M.

    1981-01-01

    A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.

  3. 77 FR 73056 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Science.gov (United States)

    2012-12-07

    ... Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes... (ITPs) for light water cooled nuclear power plants. DATES: Submit comments by January 31, 2013. Comments...

  4. Development of 20 kW input power coupler for 1.3 GHz ERL main linac. Component test at 30 kW IOT test stand

    International Nuclear Information System (INIS)

    Sakai, Hiroshi; Umemori, Kensei; Sakanaka, Shogo; Takahashi, Takeshi; Furuya, Takaaki; Shinoe, Kenji; Ishii, Atsushi; Nakamura, Norio; Sawamura, Masaru

    2009-01-01

    We started to develop an input coupler for a 1.3 GHz ERL superconducting cavity. Required input power is about 20 kW for the cavity acceleration field of 20 MV/m and the beam current of 100 mA in energy recovery operation. The input coupler is designed based on the STF-BL input coupler and some modifications are applied to the design for the CW 20 kW power operation. We fabricated input coupler components such as ceramic windows and bellows and carried out the high-power test of the components by using a 30 kW IOT power source and a test stand constructed for the highpower test. In this report, we mainly describe the results of the high-power test of ceramic window and bellows. (author)

  5. 77 FR 70484 - Preoperational Testing of Onsite Electric Power Systems To Verify Proper Load Group Assignments...

    Science.gov (United States)

    2012-11-26

    ...-1294, ``Preoperational Testing of On-Site Electric Power Systems to Verify Proper Load Group... entitled ``Preoperational Testing of On- Site Electric Power Systems to Verify Proper Load Group... Electric Power Systems to Verify Proper Load Group Assignments, Electrical Separation, and Redundancy...

  6. Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

    Science.gov (United States)

    Polzin, K. A.; Pearson, J. B.; Webster, K.; Godfoy, T. J.; Bossard, J. A.

    2013-01-01

    Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency

  7. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance

  8. Test-bed Assessment of Communication Technologies for a Power-Balancing Controller

    DEFF Research Database (Denmark)

    Findrik, Mislav; Pedersen, Rasmus; Hasenleithner, Eduard

    2016-01-01

    and control. In this paper, we present a Smart Grid test-bed that integrates various communication technologies and deploys a power balancing controller for LV grids. Control performance of the introduced power balancing controller is subsequently investigated and its robustness to communication network cross......Due to growing need for sustainable energy, increasing number of different renewable energy resources are being connected into distribution grids. In order to efficiently manage a decentralized power generation units, the smart grid will rely on communication networks for information exchange...

  9. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  10. Survey of the power ramp performance testing of KWU'S PWR UO 2, fuel

    Science.gov (United States)

    Ga¨rtner, M.; Fischer, G.

    1987-06-01

    To determine the power ramp performance of KWU's PWR UO 2 fuel, 134 fuel rodlets with burnups of up to 46 GWd/ t (U) and several fuel assemblies with 19 to 30 GWd/t (U) burnup were ramped in power in the research reactors HFR Petten/The Netherlands and R2 Studsvik/Sweden and in the power plants KWO and KWB-A/Germany, respectively. The power ramp tests demonstrate decreasing resistance of the PWR fuel rods to PCI (pellet-to-clad interaction) up to fuel burnups of 35 GWd/t (U) and a reversal effect at higher burnups. The fuel rods can be operated free of defects at fast power transients to linear heat generation rates of up to 400 W/cm, at least.Power levels of up to 490 W/cm can be reached without defects by reducing the ramp rate. After reshuffling according to an out-in scheme, 1-cycle fuel assemblies may return to rod powers of up to 480 W/cm with a power increase rate of up to 10 W/(cm min) without fuel rod damage. Set points basing on these test results and incorporated into the power distribution control and power density limitation system of KWU's advanced power plants guarantee safe plant operation under normal and load follow operating conditions.

  11. European stress tests for nuclear power plants. The Swedish National Report

    International Nuclear Information System (INIS)

    2011-01-01

    On 11 March 2011, the Tohoku region in north Honshu, Japan, suffered a severe earthquake with an ensuing tsunami and an accident at the Fukushima Dai-ichi nuclear power plant. Due to the accident the Council of the European Union declared in late March that Member States were prepared to begin reviewing safety at nuclear facilities in the European Union by means of a comprehensive assessment of risk and safety ('stress testing'). On 25 May, SSM ordered the licensees of the nuclear power plants to conduct renewed analyses of the facilities' resilience against different kinds of natural phenomena. They were also to analyse how the facilities would be capable of dealing with a prolonged loss of electrical power, regardless of cause. On 31 October, the licensees reported on their stress tests to SSM. After reviewing these reports, SSM produced a summary stress test report, which was submitted to the Government on the 15 December. The present report is the national report on Swedish stress tests of nuclear power plants. The report will be submit to the European Commission no later than 31 December. Based on the review SSM has drawn the conclusion that the stress tests carried out by Swedish licensees are largely performed in accordance with the specification resolved within the European Union. The scope and depth of these analyses and assessments are essentially in accordance with ENSREG's definition of 'a comprehensive assessment of risk and safety'. The stress tests show that Swedish facilities are robust, but the tests also identify a number of opportunities to further strengthen the facilities' robustness. SSM will order the respective licensees to present an action plan for dealing with the results from the stress tests. The Authority will then examine the plans and adopt a standpoint on proposed measures as well as check that the necessary safety improvements are made. In a number of cases, the stress tests indicate deficiencies in relation to, or alternatively

  12. Summary of Test Results From a 1 kWe-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Briggs, Maxwell H.; Geng, Steven M.; Pearson, J. Boise; Godfroy, Thomas J.

    2010-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

  13. Standards for measurements and testing of wind turbine power quality

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P [Risoe National Lab., Roskilde (Denmark); Gerdes, G; Klosse, R; Santjer, F [DEWI, Wilhelmshaven (Germany); Robertson, N; Davy, W [NEL, Glasgow (United Kingdom); Koulouvari, M; Morfiadakis, E [CRES, Pikermi (Greece); Larsson, Aa [Chalmers Univ. of Technology, Goeteborg (Sweden)

    1999-03-01

    The present paper describes the work done in power quality sub-task of the project `European Wind Turbine Testing Procedure Developments` funded by the EU SMT program. The objective of the power quality sub-task has been to make analyses and new recommendation(s) for the standardisation of measurement and verification of wind turbine power quality. The work has been organised in three major activities. The first activity has been to propose measurement procedures and to verify existing and new measurement procedures. This activity has also involved a comparison of the measurements and data processing of the participating partners. The second activity has been to investigate the influence of terrain, grid properties and wind farm summation on the power quality of wind turbines with constant rotor speed. The third activity has been to investigate the influence of terrain, grid properties and wind farm summation on the power quality of wind turbines with variable rotor speed. (au)

  14. 40 CFR 1048.505 - How do I test engines using steady-state duty cycles, including ramped-modal testing?

    Science.gov (United States)

    2010-07-01

    ...-state duty cycles, including ramped-modal testing? 1048.505 Section 1048.505 Protection of Environment... SPARK-IGNITION ENGINES Test Procedures § 1048.505 How do I test engines using steady-state duty cycles... some cases, we allow you to choose the appropriate steady-state duty cycle for an engine. In these...

  15. Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning

    DEFF Research Database (Denmark)

    Frigaard, Peter; Kofoed, Jens Peter

    The first Wave Dragon prototype power production testing started May 2003 and ended temporarily primo 2005. In the mentioned period Wave Dragon was situated in a corner of Nissum Bredning with relative little amount of wave energy. Main purpose of the tests was demonstration of survivability...

  16. 76 FR 52355 - NUREG-1482, Revision 2, “Guidelines for Inservice Testing at Nuclear Power Plants, Draft Report...

    Science.gov (United States)

    2011-08-22

    ... Testing at Nuclear Power Plants, Draft Report for Comment'' AGENCY: Nuclear Regulatory Commission. ACTION... Testing at Nuclear Power Plants, Draft Report for Comment,'' and subtitled ``Inservice Testing of Pumps... Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants'' is available electronically...

  17. Effect of power change on fission gas release. Re-irradiation tests of spent fuel at JMTR

    International Nuclear Information System (INIS)

    Nakamura, Jinichi; Shimizu, Michio; Ishii, Tadahiko; Endo, Yasuichi; Ohwada, Isao; Nabeya, Hideaki; Uetsuka, Hiroshi

    1999-01-01

    A full length rod irradiated at Tsuruga unit 1 was refabricated to short length rods, and rod inner pressure gauges were re-instrumented to the rods. Re-irradiation tests to study the fission gas release during power change were carried out by means of BOCA/OSF-1 facility at the JMTR. In the tests, steady state operation at 40 kW/m and power cycling operations between 20 and 40 kW/m were conducted for the same high power holding time, and the rod inner pressure change during the tests was measured. The rod inner pressure increase was observed during power change, especially during power reduction. The rod inner pressure increase during a power cycling depended on the length of the high power operation just before the power cycling. The fission gas release during power reduction is estimated to be the release from fission gas bubbles on the grain boundary caused by the thermal stress in the pellet during power reduction. When steady state operation and power cycling were repeated at the power levels of 30, 35 and 40 kW/m, the power cycling accelerated the fission gas release compared with the steady state operation. (author)

  18. Summary revaluation of cold testing of the first block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Miskolci, M.; Sarvaic, I.

    1998-01-01

    The document contents summary revaluation of the stage of cold testing of the first unit of nuclear power plant Mochovce. The valuation is processed in individual systems with safety significance. The process and results of system testing and their conclusions for the block readiness for active testing are summarized in the document. The valuation has been elaborated by a scientific management for start-up of nuclear power plant Mochovce as an independent conductor assistance for activation check from the nuclear safety point of view. The valuation of the activation results of systems in the first unit of nuclear power plant was processed as of 15.3.1998

  19. System and method for advanced power management

    Science.gov (United States)

    Atcitty, Stanley [Albuquerque, NM; Symons, Philip C [Surprise, AZ; Butler, Paul C [Albuquerque, NM; Corey, Garth P [Albuquerque, NM

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  20. Upgrade of the SLAC SLED II Pulse Compression System Based on Recent High Power Tests

    International Nuclear Information System (INIS)

    Vlieks, A.E.; Fowkes, W.R.; Loewen, R.J.; Tantawi, S.G.

    2011-01-01

    In the Next Linear Collider (NLC) it is expected that the high power rf components be able to handle peak power levels in excess of 400 MW. We present recent results of high power tests designed to investigate the RF breakdown limits of the X-band pulse compression system used at SLAC. (SLED-II). Results of these tests show that both the TE 01 -TE 10 mode converter and the 4-port hybrid have a maximum useful power limit of 220-250 MW. Based on these tests, modifications of these components have been undertaken to improve their peak field handling capability. Results of these modifications will be presented. As part of an international effort to develop a new 0.5-1.5 TeV electron-positron linear collider for the 21st century, SLAC has been working towards a design, referred to as 'The Next Linear Collider' (NLC), which will operate at 11.424 GHz and utilize 50-75 MW klystrons as rf power sources. One of the major challenges in this design, or any other design, is how to generate and efficiently transport extremely high rf power from a source to an accelerator structure. SLAC has been investigating various methods of 'pulse compressing' a relatively wide rf pulse ((ge) 1 μs) from a klystron into a narrower, but more intense, pulse. Currently a SLED-II pulse compression scheme is being used at SLAC in the NLC Test Accelerator (NLCTA) and in the Accelerator Structures Test Area (ASTA) to provide high rf power for accelerator and component testing. In ASTA, a 1.05 μs pulse from a 50 MW klystron was successfully pulse compressed to 205 MW with a pulse width of 150 ns. Since operation in NLC will require generating and transporting rf power in excess of 400 MW it was decided to test the breakdown limits of the SLED-II rf components in ASTA with rf power up to the maximum available of 400 MW. This required the combining of power from two 50 MW klystrons and feeding the summed power into the SLED-II pulse compressor. Results from this experiment demonstrated that two of

  1. 75 FR 52321 - Dry Lake Wind Power II LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2010-08-25

    ... proceeding, of Dry Lake Wind Power II LLC application for market-based rate authority, with an accompanying... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-1720-000] Dry Lake Wind Power II LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket...

  2. Power Systems Development Facility Gasification Test Run TC07

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-04-05

    This report discusses Test Campaign TC07 of the Kellogg Brown & Root, Inc. (KBR) Transport Reactor train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Reactor is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). The Transport Reactor was operated as a pressurized gasifier during TC07. Prior to TC07, the Transport Reactor was modified to allow operations as an oxygen-blown gasifier. Test Run TC07 was started on December 11, 2001, and the sand circulation tests (TC07A) were completed on December 14, 2001. The coal-feed tests (TC07B-D) were started on January 17, 2002 and completed on April 5, 2002. Due to operational difficulties with the reactor, the unit was taken offline several times. The reactor temperature was varied between 1,700 and 1,780 F at pressures from 200 to 240 psig. In TC07, 679 hours of solid circulation and 442 hours of coal feed, 398 hours with PRB coal and 44 hours with coal from the Calumet mine, and 33 hours of coke breeze feed were attained. Reactor operations were problematic due to instrumentation problems in the LMZ resulting in much higher than desired operating temperatures in the reactor. Both reactor and PCD operations were stable and the modifications to the lower part of the gasifier performed well while testing the gasifier with PRB coal feed.

  3. Photovoltaic power system tests on an 8-kilowatt single-phase line-commutated inverter

    Science.gov (United States)

    Stover, J. B.

    1978-01-01

    Efficiency and power factor were measured as functions of solar array voltage and current. The effects of input shunt capacitance and series inductance were determined. Tests were conducted from 15 to 75 percent of the 8 kW rated inverter input power. Measured efficiencies ranged from 76 percent to 88 percent at about 50 percent of rated inverter input power. Power factor ranged from 36 percent to 72 percent.

  4. Prediction of reflood behavior for tests with differing axial power shapes using WCOBRA/TRAC

    International Nuclear Information System (INIS)

    Bajorek, S.M.; Hochreiter, L.E.

    1991-01-01

    The rector core power shape can vary over the fuel cycle due to load follow, control rod movement, burnup effects and Xenon transients. a best estimate thermal-hydraulic code must be able to accurately predict the reflooding behavior for different axial power shapes in order to find the power shapes effects on the loss-of-coolant peak cladding temperature. Several different reflood heat transfer experiments have been performed at the same or similar PWR reflood conditions with different axial power shapes. These experiments have different rod diameters, were full length, 3.65 m (12 feet) in height, and had simple egg crate grids. The WCOBRA/TRAC code has been used to model several different tests from these three experiments to examine the code's capability to predict the reflood transient for different power shapes, with a consistent model and noding scheme. This paper describes these different experiments, their power shapes, and the test conditions. The WCOBRA/TRAC code is described as well as the noding scheme, and the calculated results will be compared in detail with the test data rod temperatures. An overall assessment of the code's predictions of these experiments is presented

  5. Test location Guetsch, Switzerland for wind-power installations; Teststandort fuer Windkraftanlagen Guetsch. Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Schaffner, B.; Cattin, R.; Schilter, Ch.

    2007-07-15

    This illustrated technical report for the Swiss Federal Office of Energy (SFOE) describes work done on the preliminary project for providing test facilities for wind-power installations on the 'Guetsch' location in the Swiss Alps. In the context of the Alpine Test Site Guetsch project, which involves meteorological measurements and wind turbine performance analysis research, a comprehensive infrastructure for the acquisition of climate data and the performance of wind turbines has been defined. This work is to be carried out by the Swiss Federal Office of Meteorology and Climatology MeteoSwiss and the company Meteotest within the framework of the COST Action 727 2005 - 2008 of the European Union. The aim of this preliminary study is to identify the possibilities for the realisation of an alpine test site for wind turbines based on the existing infrastructure. The economic and technical conditions for the testing of both large and small wind turbines are discussed. Topics examined include site ownership and access, infrastructure and measurement systems, financing possibilities and a timeline for implementation.

  6. Pre- and post-test analyses of a KKL turbine trip test at 109% power using RETRAN-3D

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, P

    2001-03-01

    As part of the PSI/HSK STARS project, pre-test calculations have been performed for a KKL turbine trip test at 109% power using the RETRAN-3D code. In this paper, we first present the results of these calculations, together with a description of the test and a comparison of the results with the measured plant data, and then discuss in more detail the differences between the pre-test results and the plant measurements, including the differences in the initial and boundary conditions, and how these differences influenced the calculated results. Finally, we comment on a series of post-test and sensitivity analyses, which were performed to resolve some of the discrepancies. The results of the pre-test (blind) calculations show good overall agreement with the experimental data, particularly for the maximum in the steam-line mass flow rate following the opening of the turbine bypass valves. This is of critical importance, since the steam-line flow has the least margin to the reactor scram limit. The agreement is especially good since the control rod banks used for the selected rod insertion were changed from those given in the test specification. Following a review of the comparison of the pre-test calculations with the measured data, several deficiencies in the RETRAN-3D model for KKL were identified and corrected as part of the post-test analysis. This allowed for both an improvement in the calculated results, and a deeper understanding of the behaviour of the turbine trip transient. (author)

  7. Pre- and post-test analyses of a KKL turbine trip test at 109% power using RETRAN-3D

    International Nuclear Information System (INIS)

    Coddington, P.

    2001-01-01

    As part of the PSI/HSK STARS project, pre-test calculations have been performed for a KKL turbine trip test at 109% power using the RETRAN-3D code. In this paper, we first present the results of these calculations, together with a description of the test and a comparison of the results with the measured plant data, and then discuss in more detail the differences between the pre-test results and the plant measurements, including the differences in the initial and boundary conditions, and how these differences influenced the calculated results. Finally, we comment on a series of post-test and sensitivity analyses, which were performed to resolve some of the discrepancies. The results of the pre-test (blind) calculations show good overall agreement with the experimental data, particularly for the maximum in the steam-line mass flow rate following the opening of the turbine bypass valves. This is of critical importance, since the steam-line flow has the least margin to the reactor scram limit. The agreement is especially good since the control rod banks used for the selected rod insertion were changed from those given in the test specification. Following a review of the comparison of the pre-test calculations with the measured data, several deficiencies in the RETRAN-3D model for KKL were identified and corrected as part of the post-test analysis. This allowed for both an improvement in the calculated results, and a deeper understanding of the behaviour of the turbine trip transient. (author)

  8. Power Systems Development Facility Gasification Test Run TC09

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-09-30

    This report discusses Test Campaign TC09 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode of operation using a particulate control device (PCD). The Transport Gasifier was operated as a pressurized gasifier during TC09 in air- and oxygen-blown modes. Test Run TC09 was started on September 3, 2002, and completed on September 26, 2002. Both gasifier and PCD operations were stable during the test run, with a stable baseline pressure drop. The oxygen feed supply system worked well and the transition from air to oxygen was smooth. The gasifier temperature varied between 1,725 and 1,825 F at pressures from 125 to 270 psig. The gasifier operates at lower pressure during oxygen-blown mode due to the supply pressure of the oxygen system. In TC09, 414 hours of solid circulation and over 300 hours of coal feed were attained with almost 80 hours of pure oxygen feed.

  9. Power functional theory for the dynamic test particle limit

    International Nuclear Information System (INIS)

    Brader, Joseph M; Schmidt, Matthias

    2015-01-01

    For classical Brownian systems both in and out of equilibrium we extend the power functional formalism of Schmidt and Brader (2013 J. Chem. Phys. 138 214101) to mixtures of different types of particles. We apply the framework to develop an exact dynamical test particle theory for the self and distinct parts of the van Hove function, which characterize tagged and collective particle motion. The memory functions that induce non-Markovian dynamics are related to functional derivatives of the excess (over ideal) free power dissipation functional. The method offers an alternative to the recently found nonequilibrium Ornstein–Zernike relation for dynamic pair correlation functions. (paper)

  10. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    Science.gov (United States)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  11. Charging and discharging tests for obtaining an accurate dynamic electro-thermal model of high power lithium-ion pack system for hybrid and EV applications

    DEFF Research Database (Denmark)

    Mihet-Popa, Lucian; Camacho, Oscar Mauricio Forero; Nørgård, Per Bromand

    2013-01-01

    This paper presents a battery test platform including two Li-ion battery designed for hybrid and EV applications, and charging/discharging tests under different operating conditions carried out for developing an accurate dynamic electro-thermal model of a high power Li-ion battery pack system....... The aim of the tests has been to study the impact of the battery degradation and to find out the dynamic characteristics of the cells including nonlinear open circuit voltage, series resistance and parallel transient circuit at different charge/discharge currents and cell temperature. An equivalent...... circuit model, based on the runtime battery model and the Thevenin circuit model, with parameters obtained from the tests and depending on SOC, current and temperature has been implemented in MATLAB/Simulink and Power Factory. A good alignment between simulations and measurements has been found....

  12. Power Performance Verification of a Wind Farm Using the Friedman's Test.

    Science.gov (United States)

    Hernandez, Wilmar; López-Presa, José Luis; Maldonado-Correa, Jorge L

    2016-06-03

    In this paper, a method of verification of the power performance of a wind farm is presented. This method is based on the Friedman's test, which is a nonparametric statistical inference technique, and it uses the information that is collected by the SCADA system from the sensors embedded in the wind turbines in order to carry out the power performance verification of a wind farm. Here, the guaranteed power curve of the wind turbines is used as one more wind turbine of the wind farm under assessment, and a multiple comparison method is used to investigate differences between pairs of wind turbines with respect to their power performance. The proposed method says whether the power performance of the specific wind farm under assessment differs significantly from what would be expected, and it also allows wind farm owners to know whether their wind farm has either a perfect power performance or an acceptable power performance. Finally, the power performance verification of an actual wind farm is carried out. The results of the application of the proposed method showed that the power performance of the specific wind farm under assessment was acceptable.

  13. Study of Power Flow Algorithm of AC/DC Distribution System including VSC-MTDC

    Directory of Open Access Journals (Sweden)

    Haifeng Liang

    2015-08-01

    Full Text Available In recent years, distributed generation and a large number of sensitive AC and DC loads have been connected to distribution networks, which introduce a series of challenges to distribution network operators (DNOs. In addition, the advantages of DC distribution networks, such as the energy conservation and emission reduction, mean that the voltage source converter based multi-terminal direct current (VSC-MTDC for AC/DC distribution systems demonstrates a great potential, hence drawing growing research interest. In this paper, considering losses of the reactor, the filter and the converter, a mathematical model of VSC-HVDC for the load flow analysis is derived. An AC/DC distribution network architecture has been built, based on which the differences in modified equations of the VSC-MTDC-based network under different control modes are analyzed. In addition, corresponding interface functions under five control modes are provided, and a back/forward iterative algorithm which is applied to power flow calculation of the AC/DC distribution system including VSC-MTDC is proposed. Finally, by calculating the power flow of the modified IEEE14 AC/DC distribution network, the efficiency and validity of the model and algorithm are evaluated. With various distributed generations connected to the network at appropriate locations, power flow results show that network losses and utilization of transmission networks are effectively reduced.

  14. Performance tests of a power-electronics converter for multi-megawatt wind turbines using a grid emulator

    International Nuclear Information System (INIS)

    Averous, Nurhan Rizqy; Berthold, Anica; Monti, Antonello; De Doncker, Rik W.; Schneider, Alexander; Schwimmbeck, Franz

    2016-01-01

    A vast increase of wind turbines (WT) contribution in the modern electrical grids have led to the development of grid connection requirements. In contrast to the conventional test method, testing power-electronics converters for WT using a grid emulator at Center for Wind Power Drives (CWD) RWTH Aachen University offers more flexibility for conducting test scenarios. Further analysis on the performance of the device under test (DUT) is however required when testing with grid emulator since the characteristic of the grid emulator might influence the performance of the DUT. This paper focuses on the performance analysis of the DUT when tested using grid emulator. Beside the issue regarding the current harmonics, the performance during Fault Ride-Through (FRT) is discussed in detail. A power hardware in the loop setup is an attractive solution to conduct a comprehensive study on the interaction between the power-electronics converters and the electrical grids. (paper)

  15. Performance tests of a power-electronics converter for multi-megawatt wind turbines using a grid emulator

    Science.gov (United States)

    Rizqy Averous, Nurhan; Berthold, Anica; Schneider, Alexander; Schwimmbeck, Franz; Monti, Antonello; De Doncker, Rik W.

    2016-09-01

    A vast increase of wind turbines (WT) contribution in the modern electrical grids have led to the development of grid connection requirements. In contrast to the conventional test method, testing power-electronics converters for WT using a grid emulator at Center for Wind Power Drives (CWD) RWTH Aachen University offers more flexibility for conducting test scenarios. Further analysis on the performance of the device under test (DUT) is however required when testing with grid emulator since the characteristic of the grid emulator might influence the performance of the DUT. This paper focuses on the performance analysis of the DUT when tested using grid emulator. Beside the issue regarding the current harmonics, the performance during Fault Ride-Through (FRT) is discussed in detail. A power hardware in the loop setup is an attractive solution to conduct a comprehensive study on the interaction between the power-electronics converters and the electrical grids.

  16. A Poisson-Fault Model for Testing Power Transformers in Service

    Directory of Open Access Journals (Sweden)

    Dengfu Zhao

    2014-01-01

    Full Text Available This paper presents a method for assessing the instant failure rate of a power transformer under different working conditions. The method can be applied to a dataset of a power transformer under periodic inspections and maintenance. We use a Poisson-fault model to describe failures of a power transformer. When investigating a Bayes estimate of the instant failure rate under the model, we find that complexities of a classical method and a Monte Carlo simulation are unacceptable. Through establishing a new filtered estimate of Poisson process observations, we propose a quick algorithm of the Bayes estimate of the instant failure rate. The proposed algorithm is tested by simulation datasets of a power transformer. For these datasets, the proposed estimators of parameters of the model have better performance than other estimators. The simulation results reveal the suggested algorithms are quickest among three candidates.

  17. FY 2016 Status Report: Documentation of All CIRFT Data including Hydride Reorientation Tests (Draft M2)

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jy-An John [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Wang, Hong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Jiang, Hao [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Bevard, Bruce B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Scaglione, John M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-09-04

    The first portion of this report provides a detailed description of fiscal year (FY) 2015 test result corrections and analysis updates based on FY 2016 updates to the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) program methodology, which is used to evaluate the vibration integrity of spent nuclear fuel (SNF) under normal conditions of transport (NCT). The CIRFT consists of a U-frame test setup and a real-time curvature measurement method. The three-component U-frame setup of the CIRFT has two rigid arms and linkages connecting to a universal testing machine. The curvature SNF rod bending is obtained through a three-point deflection measurement method. Three linear variable differential transformers (LVDTs) are clamped to the side connecting plates of the U-frame and used to capture deformation of the rod. The second portion of this report provides the latest CIRFT data, including data for the hydride reorientation test. The variations in fatigue life are provided in terms of moment, equivalent stress, curvature, and equivalent strain for the tested SNFs. The equivalent stress plot collapsed the data points from all of the SNF samples into a single zone. A detailed examination revealed that, at the same stress level, fatigue lives display a descending order as follows: H. B. Robinson Nuclear Power Station (HBR), LMK, and mixed uranium-plutonium oxide (MOX). Just looking at the strain, LMK fuel has a slightly longer fatigue life than HBR fuel, but the difference is subtle. The third portion of this report provides finite element analysis (FEA) dynamic deformation simulation of SNF assemblies . In a horizontal layout under NCT, the fuel assembly’s skeleton, which is formed by guide tubes and spacer grids, is the primary load bearing apparatus carrying and transferring vibration loads within an SNF assembly. These vibration loads include interaction forces between the SNF assembly and the canister basket walls. Therefore, the integrity of the guide

  18. High power testing oa ANL X-band dielectric-loaded accelerating structures

    International Nuclear Information System (INIS)

    Power, J. G.; Gai, W.; Jing, C.; Konecny, R.; Gold, S. H.; Kinkead, A. K.

    2002-01-01

    In the second phase of a program to develop a compact accelerator based on a dielectric-loaded accelerating structure, we have conducted high power tests on a traveling-wave and a standing-wave prototype. Indications are that the traveling-wave structure achieved an accelerating gradient of 3-5 MV/m before the input coupling window failed, while the standing wave structure was poorly matched at high power due to contamination of copper residue on its coupling window. To solve both of these problems, a new method for coupling RF into the structures has been developed. The new couplers and the rest of the modular structure are currently under construction and will be tested at the Naval Research Laboratory shortly

  19. Industrial tests of rhodium self-powered detectors: the Golfech 2 experimentation

    International Nuclear Information System (INIS)

    Mourlevat, J.L.; Janvier, D.; Warren, H.D.

    2000-01-01

    In co-operation with Electricite de France (EDF), FRAMATOME has been testing two in-core strings which are equipped with rhodium self-powered detectors (SPDs) in the Golfech Unit 2 reactor (1300 MW, 4L plant) since August 1997. The rhodium SPDs and the strings which support them were designed and built by the US FRAMATOME subsidiary FRAMATOME-COGEMA-FUEL (FCF). The rhodium signals and some other plant parameters are acquired through the use of a specific device designed by the CEA (Commissariat a l'Energie Atomique) and are processed off-line by FRAMATOME. This demonstration test is planned to last until mid-2000. The following presentation is focused on the results obtained during the first demonstration cycle (from 08/97 to 12/98). The tests that have been conducted consist of checking the rhodium depletion and of comparing the rhodium signals to the movable probes. In order to compensate for the delay in the rhodium signals, a deconvolution algorithm has also been tested. Up to now, the results are very satisfactory and a future large scale industrial application is being discussed with the EDF. The main objective of the next experimentation phase is to test - under industrial conditions - a prototype of an on-line monitoring unit known as the Partial In-Core Monitoring System (PIMS). This system will include 16 rhodium in-core strings and will use an on-line 3-D core model. (authors)

  20. Design of Jet lower hybrid current drive generator and operation of high power test bed

    International Nuclear Information System (INIS)

    Dobbing, J.A.; Bosia, G.; Brandon, M.; Gammelin, M.; Gormezano, C.; Jacquinot, J.; Jessop, G.; Lennholm, M.; Pain, M.; Sibley, A.

    1989-01-01

    The JET Lower Hybrid Current Drive (LHCD) generator consists of 24 klystrons each rated for 650 KW operating at 3.7 GHz, giving a nominal generator power of 15.6 MW for 10 seconds or 12 MW for 20 seconds. This power will be transmitted through 24 waveguides to a phased array launcher on one of the main ports of the JET machine. In addition, two klystrons are currently being operated on a high power test bed to establish reliable operation of the generators components and test high power microwave components prior to their installation

  1. Collaborative National Program for the Development and Performance Testing of Distributed Power Technologies with Emphasis on Combined Heat and Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    Soinski, Arthur; Hanson, Mark

    2006-06-28

    A current barrier to public acceptance of distributed generation (DG) and combined heat and power (CHP) technologies is the lack of credible and uniform information regarding system performance. Under a cooperative agreement, the Association of State Energy Research and Technology Transfer Institutions (ASERTTI) and the U.S. Department of Energy have developed four performance testing protocols to provide a uniform basis for comparison of systems. The protocols are for laboratory testing, field testing, long-term monitoring and case studies. They have been reviewed by a Stakeholder Advisory Committee made up of industry, public interest, end-user, and research community representatives. The types of systems covered include small turbines, reciprocating engines (including Stirling Cycle), and microturbines. The protocols are available for public use and the resulting data is publicly available in an online national database and two linked databases with further data from New York State. The protocols are interim pending comments and other feedback from users. Final protocols will be available in 2007. The interim protocols and the national database of operating systems can be accessed at www.dgdata.org. The project has entered Phase 2 in which protocols for fuel cell applications will be developed and the national and New York databases will continue to be maintained and populated.

  2. Fusion power demonstration - a baseline for the mirror engineering test reactor

    International Nuclear Information System (INIS)

    Henning, C.D.; Logan, B.G.; Neef, W.S.

    1983-01-01

    Developing a definition of an engineering test reactor (ETR) is a current goal of the Office of Fusion Energy (OFE). As a baseline for the mirror ETR, the Fusion Power Demonstration (FPD) concept has been pursued at Lawrence Livermore National Laboratory (LLNL) in cooperation with Grumman Aerospace, TRW, and the Idaho National Engineering Laboratory. Envisioned as an intermediate step to fusion power applications, the FPD would achieve DT ignition in the central cell, after which blankets and power conversion would be added to produce net power. To achieve ignition, a minimum central cell length of 67.5 m is needed to supply the ion and alpha particles radial drift pumping losses in the transition region. The resulting fusion power is 360 MW. Low electron-cyclotron heating power of 12 MW, ion-cyclotron heating of 2.5 MW, and a sloshing ion beam power of 1.0 MW result in a net plasma Q of 22. A primary technological challenge is the 24-T, 45-cm bore choke coil, comprising a copper hybrid insert within a 15 to 18 T superconducting coil

  3. RF characterization and testing of ridge waveguide transitions for RF power couplers

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Rajesh; Jose, Mentes; Singh, G.N. [Ion Accelerator Development Division, Bhabha Atomic Research Centre, Mumbai 400085 (India); Kumar, Girish [Department of Electrical Engineering, IIT Bombay, Mumbai 400076,India (India); Bhagwat, P.V. [Ion Accelerator Development Division, Bhabha Atomic Research Centre, Mumbai 400085 (India)

    2016-12-01

    RF characterization of rectangular to ridge waveguide transitions for RF power couplers has been carried out by connecting them back to back. Rectangular waveguide to N type adapters are first calibrated by TRL method and then used for RF measurements. Detailed information is obtained about their RF behavior by measurements and full wave simulations. It is shown that the two transitions can be characterized and tuned for required return loss at design frequency of 352.2 MHz. This opens the possibility of testing and conditioning two transitions together on a test bench. Finally, a RF coupler based on these transitions is coupled to an accelerator cavity. The power coupler is successfully tested up to 200 kW, 352.2 MHz with 0.2% duty cycle.

  4. Simulation of IST Turbomachinery Power-Neutral Tests with the ANL Plant Dynamics Code

    Energy Technology Data Exchange (ETDEWEB)

    Moisseytsev, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Sienicki, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-12-13

    The validation of the Plant Dynamics Code (PDC) developed at Argonne National Laboratory (ANL) for the steady-state and transient analysis of supercritical carbon dioxide (sCO2) systems has been continued with new test data from the Naval Nuclear Laboratory (operated by Bechtel Marine Propulsion Corporation) Integrated System Test (IST). Although data from three runs were provided to ANL, only two of the data sets were analyzed and described in this report. The common feature of these tests is the power-neutral operation of the turbine-compressor shaft, where no external power through the alternator was provided during the tests. Instead, the shaft speed was allowed to change dictated by the power balance between the turbine, the compressor, and the power losses in the shaft. The new test data turned out to be important for code validation for several reasons. First, the power-neutral operation of the shaft allows validation of the shaft dynamics equations in asynchronous mode, when the shaft is disconnected from the grid. Second, the shaft speed control with the compressor recirculation (CR) valve not only allows for testing the code control logic itself, but it also serves as a good test for validation of both the compressor surge control and the turbine bypass control actions, since the effect of the CR action on the loop conditions is similar for both of these controls. Third, the varying compressor-inlet temperature change test allows validation of the transient response of the precooler, a shell-and-tube heat exchanger. The first transient simulation of the compressor-inlet temperature variation Test 64661 showed a much slower calculated response of the precooler in the calculations than the test data. Further investigation revealed an error in calculating the heat exchanger tube mass for the PDC dynamic equations that resulted in a slower change in the tube wall temperature than measured. The transient calculations for both tests were done in two steps. The

  5. A P-value model for theoretical power analysis and its applications in multiple testing procedures

    Directory of Open Access Journals (Sweden)

    Fengqing Zhang

    2016-10-01

    Full Text Available Abstract Background Power analysis is a critical aspect of the design of experiments to detect an effect of a given size. When multiple hypotheses are tested simultaneously, multiplicity adjustments to p-values should be taken into account in power analysis. There are a limited number of studies on power analysis in multiple testing procedures. For some methods, the theoretical analysis is difficult and extensive numerical simulations are often needed, while other methods oversimplify the information under the alternative hypothesis. To this end, this paper aims to develop a new statistical model for power analysis in multiple testing procedures. Methods We propose a step-function-based p-value model under the alternative hypothesis, which is simple enough to perform power analysis without simulations, but not too simple to lose the information from the alternative hypothesis. The first step is to transform distributions of different test statistics (e.g., t, chi-square or F to distributions of corresponding p-values. We then use a step function to approximate each of the p-value’s distributions by matching the mean and variance. Lastly, the step-function-based p-value model can be used for theoretical power analysis. Results The proposed model is applied to problems in multiple testing procedures. We first show how the most powerful critical constants can be chosen using the step-function-based p-value model. Our model is then applied to the field of multiple testing procedures to explain the assumption of monotonicity of the critical constants. Lastly, we apply our model to a behavioral weight loss and maintenance study to select the optimal critical constants. Conclusions The proposed model is easy to implement and preserves the information from the alternative hypothesis.

  6. DESIGN AND TESTING OF A DIGITAL REGULATOR FOR FERMILAB MAGNET POWER SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Li Vigni, Vincenzo [Palermo U.

    2012-01-01

    In this thesis, the design of a digitally controlled DC power system for testing conventional and superconducting magnets is proposed. The designed PID controller performances have been tested by the 30kA test stand for superconducting magnets, Vertical Magnet Test Facility (VMTF), which is hosted at the Fermilab Magnet Test Facility (MTF). The system is implemented on a National Instruments CompactRIO and both real-time and FPGA targets are programmed. A full 24-bit PID algorithm is coded and successfully tested by a manual tuning approach. An automated tuning algorithm is then introduced. As it will be shown by simulation and experimental results, the proposed system meets all design specifications. The current loop stability is up to 14 times better than the existing regulator and a control accuracy less than 4 ppm is achieved. Shorted-bus tests of the PID regulator have been successfully performed on the VMTF power system. In order to test the generalization capability of the designed system towards different types of magnets, the system has been easily adapted to and tested on the 10kA conventional magnet test stand (Stand C at Fermilab). As shown by experimental results, the designed PID controller features really high performancesin terms of steady-state accuracy and effectiveness of the tuning algorithm.

  7. Evaluation of load rejection to house load test at 50% power for UCN 3

    International Nuclear Information System (INIS)

    Lee, Chang Gyun; Sohn, Suk Whun; Sohn, Jong Joo; Seo, Jong Tae; Lee, Sang Keun; Kim, Yong Sung; Nam, Kyu Won; Jung, Yang Mook; Chae, Kyeong Sik; Koh, Bum Jae; Oh, Chul Sung; Park, Hee Chool

    1998-01-01

    The Load Rejection to House Load test at 50% power was successfully performed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3 and 4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as completeness of the plant design

  8. On test results of the superconducting magnetic energy storage (SMES) system in Ariuragawa Power Station

    International Nuclear Information System (INIS)

    Katahira, Osamu; Fukui, Fumihiko; Karano, Koichi; Irie, Fujio; Takeo, Masakatsu; Okada, Hidehiko; Shimojo, Toshikazu.

    1991-01-01

    SMES system is that for storing electric energy in the form of magnetic energy by flowing DC current through a superconducting coil by utilizing the characteristics of its superconductivity. It comprises a superconducting coil for storing energy, an AC-DC converter, the cooling system for maintaining extremely low temperature and so on. The features of SMES are the high efficiency of storing electric energy (more than 90 % in the large scale system), the fast response to store and release electric power, and effective power and reactive power can be independently and arbitrarily controlled. It is expected that SMES can be applied to the stabilization of electric power system, the adjustment of system voltage, the adjustment of varying load and so on. In order to verify the results of the laboratory research in actual power system, the system test was carried out in Ariuragawa Power Station on November 20-22, 1990. The outline of the test, the method of controlling SMES, the test results and the examination of the results are reported. (K.I.)

  9. Virtual instrumention-based linearity test platform for DCCT of digital power supply at SSRF

    International Nuclear Information System (INIS)

    Tang Junlong; Li Deming; Shen Tianjian; Liu Hong

    2008-01-01

    Based on virtual instrumentation, a reliable and effective test platform, performing instrument control, data acquisition and data recording, has been established to evaluate linearity of high performance DCCT (DC current transducer) for digital power supply at Shanghai Synchrotron Radiation Facility (SSRF). The software in LabVIEW language was developed to perform computer communication via serial communication (RS232) and GPIB, providing a friendly user interface to the linearity test platform. This makes it easy to test the linearity and control power on or off and current output of high-precision and high-current DC constant current output power supply. The experimental data, stored in an EXCEL file, can be processed to obtain DCCT linearity, and provide basis to further analyze DCCT performance in the future. (authors)

  10. A test of the theory of nonrenewable resources. Controlling for exploration and market power

    Energy Technology Data Exchange (ETDEWEB)

    Malischek, Raimund [Koeln Univ. (Germany). Inst. of Energy Economics; Tode, Christian [Koeln Univ. (Germany). Inst. of Energy Economics; Koeln Univ. (Germany). Dept. of Economics

    2015-05-15

    Despite the central role of the Hotelling model within the theory of nonrenewable resources, tests of the model are rarely found. If existent, these tests tend to ignore two key features, namely market power and exploration. We therefore suggest an extension of the basic Hotelling framework to incorporate exploration activity and market power and propose an implicit price behavior test of the model to indicate whether firms undergo inter-temporal optimization. When applied to a newly constructed data set for the uranium mining industry, the null hypothesis of the firm optimizing inter-temporally is rejected in all settings. However, parameter estimates of the model still yield valuable information on cost structure, resource scarcity and market power. Our results suggest that the shadow price of the resource in situ is comparably small and may be overshadowed by market power, which may serve as an explanation for the firm failing to optimize inter-temporally.

  11. A test of the theory of nonrenewable resources. Controlling for exploration and market power

    International Nuclear Information System (INIS)

    Malischek, Raimund; Tode, Christian; Koeln Univ.

    2015-01-01

    Despite the central role of the Hotelling model within the theory of nonrenewable resources, tests of the model are rarely found. If existent, these tests tend to ignore two key features, namely market power and exploration. We therefore suggest an extension of the basic Hotelling framework to incorporate exploration activity and market power and propose an implicit price behavior test of the model to indicate whether firms undergo inter-temporal optimization. When applied to a newly constructed data set for the uranium mining industry, the null hypothesis of the firm optimizing inter-temporally is rejected in all settings. However, parameter estimates of the model still yield valuable information on cost structure, resource scarcity and market power. Our results suggest that the shadow price of the resource in situ is comparably small and may be overshadowed by market power, which may serve as an explanation for the firm failing to optimize inter-temporally.

  12. Method for determining detailed rod worth profiles at low power in the fast test reactor

    International Nuclear Information System (INIS)

    Sevenich, R.A.

    1975-08-01

    A method for obtaining a detailed rod worth profile at low power for a slow control rod insertion is presented. The accuracy of the method depends on a preparatory experiment in which the test rod is dropped quickly to yield, upon analysis, the magnitude of the rod worth and an effective source value. These numbers are employed to initialize the inverse kinetics analysis for the slow insertion. Corrections for changes in detection efficiency are not included for the simulated experiments. (U.S.)

  13. State of the art in power cable design, failure mechanisms and testing

    International Nuclear Information System (INIS)

    Orton, H.

    2005-01-01

    This presentation describes state of the art in power cable design, failure mechanisms and testing. It gives a history of cable usage and design of cables, describes different cable types, assessment of the condition of cables, aging and failures, testing and diagnostics

  14. Development of an Intelligent Maximum Power Point Tracker Using an Advanced PV System Test Platform

    DEFF Research Database (Denmark)

    Spataru, Sergiu; Amoiridis, Anastasios; Beres, Remus Narcis

    2013-01-01

    The performance of photovoltaic systems is often reduced by the presence of partial shadows. The system efficiency and availability can be improved by a maximum power point tracking algorithm that is able to detect partial shadow conditions and to optimize the power output. This work proposes...... an intelligent maximum power point tracking method that monitors the maximum power point voltage and triggers a current-voltage sweep only when a partial shadow is detected, therefore minimizing power loss due to repeated current-voltage sweeps. The proposed system is validated on an advanced, flexible...... photovoltaic inverter system test platform that is able to reproduce realistic partial shadow conditions, both in simulation and on hardware test system....

  15. Leakage and Power Loss Test Results for Competing Turbine Engine Seals

    National Research Council Canada - National Science Library

    Proctor, Margaret

    2004-01-01

    .... To address engine manufacturers' concerns about the heat generation and power loss from these contacting seals, brush, finger, and labyrinth seals were tested in the NASA High Speed, High Temperature...

  16. Performance test of lower hybrid waveguide under long/high-RF power transmission

    International Nuclear Information System (INIS)

    Seki, Masami; Obara, Kenjiro; Maebara, Sunao

    1996-06-01

    Performance tests of a module for lower hybrid waveguides were carried out at the CEA Cadarache RF Test Facility. For the experiments the test module was fabricated by JAERI, the transmission line of the test bed was modified and the connection waveguides were manufactured by CEA. As the results, the thermal treatment by baking at a higher temperature was the most effective for reducing outgassing during injection of high RF power. The outgassing strongly depended on the temperature of the test module, but was independent to initial temperature. The RF injection reduced outgassing. The outgassing rate decreased to a low level of 10 -6 -10 -5 Pa m 3 /sec m 2 (10 -9 -10 -8 Torr 1/sec cm 2 ) at 400degC after 450degC-baking. The gas injection did not affect outgassing before and during RF injection. The baking under H 2 or D 2 gas atmosphere were not so effective for reducing outgassing rate. The outgassing rate did not depend on input RF power densities. The temperature in central part of the test module saturated to be ∼100degC by using of water cooling at a power level of 150 MW/m 2 RF injection, and a neutral gas pressure decreased gradually. In the water cooling case, the outgassing rate was very low less than 10 -7 Pa m 3 /sec m 2 (10 -10 Torr 1/sec cm 2 ). The steady state RF injection was demonstrated with water cooling. (author)

  17. High-power test of S-band klystron for long-pulse operation

    International Nuclear Information System (INIS)

    Morii, Y.; Oshita, E.; Abe, S.; Keishi, T.; Tomimasu, T.; Ohkubo, Y.; Yoshinao, M.; Yonezawa, H.

    1994-01-01

    FELI(Free Electron Laser Research Institute, Inc.) is constructing a free electron laser facility covering from 20μm (infra red region) to 0.35μm (ultra violet region), using an S-band linac. The linac is commissioning now. An RF system of the linac for FELs is required of long pulse duration and high stability. S-band klystrons (TOSHIBA E3729) of the FELI linac are operated in three pulse operation modes (pulse width and peak RF power; 24μs-24MW, 12.5μs-34MW, 0.5μs-70MW). The S-band klystron and its modulator were combined to test their performance. The high power test results of the S-band klystron are summarized in this paper. (author)

  18. Testing the Pareto against the lognormal distributions with the uniformly most powerful unbiased test applied to the distribution of cities.

    Science.gov (United States)

    Malevergne, Yannick; Pisarenko, Vladilen; Sornette, Didier

    2011-03-01

    Fat-tail distributions of sizes abound in natural, physical, economic, and social systems. The lognormal and the power laws have historically competed for recognition with sometimes closely related generating processes and hard-to-distinguish tail properties. This state-of-affair is illustrated with the debate between Eeckhout [Amer. Econ. Rev. 94, 1429 (2004)] and Levy [Amer. Econ. Rev. 99, 1672 (2009)] on the validity of Zipf's law for US city sizes. By using a uniformly most powerful unbiased (UMPU) test between the lognormal and the power-laws, we show that conclusive results can be achieved to end this debate. We advocate the UMPU test as a systematic tool to address similar controversies in the literature of many disciplines involving power laws, scaling, "fat" or "heavy" tails. In order to demonstrate that our procedure works for data sets other than the US city size distribution, we also briefly present the results obtained for the power-law tail of the distribution of personal identity (ID) losses, which constitute one of the major emergent risks at the interface between cyberspace and reality.

  19. A Note on Confidence Interval for the Power of the One Sample Test

    OpenAIRE

    A. Wong

    2010-01-01

    In introductory statistics texts, the power of the test of a one-sample mean when the variance is known is widely discussed. However, when the variance is unknown, the power of the Student's -test is seldom mentioned. In this note, a general methodology for obtaining inference concerning a scalar parameter of interest of any exponential family model is proposed. The method is then applied to the one-sample mean problem with unknown variance to obtain a ( 1 − ) 100% confidence interval for...

  20. Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station

    International Nuclear Information System (INIS)

    Huang, Bin; Xu, Shisen; Gao, Shiwang; Liu, Lianbo; Tao, Jiye; Niu, Hongwei; Cai, Ming; Cheng, Jian

    2010-01-01

    The first industrial-scale CO 2 capture plant in China has been demonstrated at Huaneng Beijing power plant has shown that this technology is a good option for the capture of CO 2 produced by commercial coal-fired power plants. The commissioning and industrial tests are introduced in this paper. The tests show that in the early stages of the passivation phase, the concentration variations of amine, anti-oxidant and Fe 3+ are in the normal range, and the main parameters achieve the design value. The efficiency of the CO 2 capture was about 80-85%, and by the end of January 2009 about 900 tons of CO 2 (99.7%) have been captured. The equipment investment and consumptive costs, including steam, power, solution and others, have been analyzed. The results show: the cost of the absorber and the stripper account for about 50% of main equipment; the consumptive cost is about 25.3 US$ per metric tons of CO 2 , of which the steam requirement accounts for about 55%; the COE increased by 0.02 US$/kW h and the electricity purchase price increased by 29%. (author)

  1. Analysis of in-core coolant temperatures of FFTF instrumented fuels tests at full power

    International Nuclear Information System (INIS)

    Hoth, C.W.

    1981-01-01

    Two full size highly instrumented fuel assemblies were inserted into the core of the Fast Flux Test Facility in December of 1979. The major objectives of these instrumented tests are to provide verification of the FFTF core conditions and to characterize temperature patterns within FFTF driver fuel assemblies. A review is presented of the results obtained during the power ascents and during irradiation at a constant reactor power of 400 MWt. The results obtained from these instrumented tests verify the conservative nature of the design methods used to establish core conditions in FFTF. The success of these tests also demonstrates the ability to design, fabricate, install and irradiate complex, instrumented fuel tests in FFTF using commercially procured components

  2. The Power of Unit Root Tests Against Nonlinear Local Alternatives

    DEFF Research Database (Denmark)

    Demetrescu, Matei; Kruse, Robinson

    of Econometrics 112, 359-379) in comparison to the linear Dickey-Fuller test. To this end, we consider different adjustment schemes for deterministic terms. We provide asymptotic results which imply that the error variance has a severe impact on the behavior of the tests in the nonlinear case; the reason...... for such behavior is the interplay of nonstationarity and nonlinearity. In particular, we show that nonlinearity of the data generating process can be asymptotically negligible when the error variance is moderate or large (compared to the "amount of nonlinearity"), rendering the linear test more powerful than...

  3. Round Robin Test for Performance Demonstration System of Ultrasound Examination Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Yang, Seung Han; Kim, Yong Sik; Yoon, Byung Sik; Lee, Hee Jong

    2005-01-01

    Ultrasound testing performance during in-service inspection for the main components of NPPs is strongly affected by each examination person. Therefore, ASME established a more strict qualification requirement in Sec. XI Appendix VIII for the ultrasound testing personnel in nuclear power plants. The Korean Performance Demonstration (KPD) System according to the ASME code for the ultrasonic testing personnel, equipments, and procedures to apply to the Class 1 and 2 piping ultrasound examination of nuclear power plants in Korea was established. And a round robin test was conducted in order to verify the effectiveness of PD method by comparing the examination results from the method of Performance Demonstration (PD) and a traditional ASME code dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, application of the PD method to the in-service inspection of the nuclear power plants will improve the performance of ultrasound testing

  4. CONSTRUCTION AND POWER TEST OF THE EXTRACTION KICKER MAGNET FOR SNS ACCUMULATOR RING

    International Nuclear Information System (INIS)

    PAI, C.; HAHN, H.; HSEUH, H.; LEE, Y.; MENG, W.; MI, J.; SANDBERG, J.; TODD, R.

    2005-01-01

    Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction Lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated in BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 PFN power supplies have been built, tested and delivered to OWL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TIN coating of the magnets, the installation procedure of the magnets and the full power test of the kicker with the PFN power supply

  5. More Than Just Accuracy: A Novel Method to Incorporate Multiple Test Attributes in Evaluating Diagnostic Tests Including Point of Care Tests.

    Science.gov (United States)

    Thompson, Matthew; Weigl, Bernhard; Fitzpatrick, Annette; Ide, Nicole

    2016-01-01

    Current frameworks for evaluating diagnostic tests are constrained by a focus on diagnostic accuracy, and assume that all aspects of the testing process and test attributes are discrete and equally important. Determining the balance between the benefits and harms associated with new or existing tests has been overlooked. Yet, this is critically important information for stakeholders involved in developing, testing, and implementing tests. This is particularly important for point of care tests (POCTs) where tradeoffs exist between numerous aspects of the testing process and test attributes. We developed a new model that multiple stakeholders (e.g., clinicians, patients, researchers, test developers, industry, regulators, and health care funders) can use to visualize the multiple attributes of tests, the interactions that occur between these attributes, and their impacts on health outcomes. We use multiple examples to illustrate interactions between test attributes (test availability, test experience, and test results) and outcomes, including several POCTs. The model could be used to prioritize research and development efforts, and inform regulatory submissions for new diagnostics. It could potentially provide a way to incorporate the relative weights that various subgroups or clinical settings might place on different test attributes. Our model provides a novel way that multiple stakeholders can use to visualize test attributes, their interactions, and impacts on individual and population outcomes. We anticipate that this will facilitate more informed decision making around diagnostic tests.

  6. Scope and status of the USA Engineering Test Facility including relevant TFTR research and development

    International Nuclear Information System (INIS)

    Becraft, W.R.; Reardon, P.J.

    1980-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The progress toward the design and construction of the ETF will reflect the significant achievements of past, present, and future experimental tokamak devices. Some of the features of this foundation of experimental results and relevant engineering designs and operation will derive from the Tokamak Fusion Test Reactor (TFTR) Project, now nearing the completion of its construction phase. The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy (OFE) established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF and discusses some highlights of the TFTR R and D work

  7. Scope and status of the USA Engineering Test Facility including relevant TFTR research and development

    International Nuclear Information System (INIS)

    Becraft, W.R.; Reardon, P.J.

    1981-01-01

    The vehicle by which the fusion programme would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The progress toward the design and construction of the ETF will reflect the significant achievements of past, present, and future experimental tokamak devices. Some of the features of this foundation of experimental results and relevant engineering designs and operation will derive from the Tokamak Fusion Test Reactor (TFTR) Project, now nearing the completion of its construction phase. The ETF would provide a test-bed for reactor components in the fusion environment. To initiate preliminary planning for the ETF decision, the Office of Fusion Energy (OFE) established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF and discusses some highlights of the TFTR R and D work. (author)

  8. Analytical evaluation on loss of off-side electric power simulation of the High Temperature Engineering Test Reactor

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Nakagawa, Shigeaki; Tachibana, Yukio; Takada, Eiji; Kunitomi, Kazuhiko

    2000-03-01

    A rise-to-power test of the high temperature engineering test reactor (HTTR) started on September 28 in 1999 for establishing and upgrading the technological basis for the high temperature gas-cooled reactor (HTGR). A loss of off-site electric power test of the HTTR from the normal operation under 15 and 30 MW thermal power will be carried out in the rise-to-power test. Analytical evaluations on transient behaviors of the reactor and plant during the loss of off-site electric power were conducted. These estimations are proposed as benchmark problems for the IAEA coordinated research program on 'Evaluation of HTGR Performance'. This report describes an event scenario of transient during the loss of off-site electric power, the outline of major components and system, detailed thermal and nuclear data set for these problems and pre-estimation results of the benchmark problems by an analytical code 'ACCORD' for incore and plant dynamics of the HTGR. (author)

  9. Dynamic-energetic balance of agricultural tractors: active systems for the measurement of the power requirements in static tests and under field conditions

    Directory of Open Access Journals (Sweden)

    Daniele Pochi

    2013-09-01

    Full Text Available Modern tractors are characterized by the introduction of devices designed to increase the operative performances of the machines, such as systems for monitoring and controlling various functions (through a massive use of electronics and hydraulics, or deputed to improve the comfort of the driver (paying more attention to ergonomics, air-conditioning, noise and vibration. Such devices need energy to be operated, affecting the energetic balance of the tractor. In this context, the availability of suitable methodologies and instrumental systems could be useful to provide objective, accurate and reliable measurements of the performances of the tractors under different conditions, also considering the power requirements from ancillary services and/or simulating the coupling with operating machines. The tests on the performances of tractors are now made using different methods, including the trial codes issued by the OECD Codes. Beyond their undoubted validity, they fix standard test conditions that often do not adequately represent the operative reality, so that, much remains to investigate on the actual performances provided by the tractors. From this point of view and with reference to fixed point tests, a test bench was developed for the measurement of the power required by various devices, such as transmission and air conditioning. It was used in experimental tests on a tracked tractor and on a wheeled tractor, aimed at validating the test device, measuring the power absorption related to the rotational speed of the organs of propulsion and to the characteristics curves, in order to quantify the power drawn by the transmission and by the air conditioning and assess the residual power for other tractor functions. As to field conditions, a study is being conducted at CRA-ING, within the project PTO (Mi.P.A.A.F., to develop a mobile test bench aimed at evaluating the power required by different operations, such as self displacement, traction, use of

  10. Direct FuelCell/Turbine Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hossein Ghezel-Ayagh

    2008-09-30

    This report summarizes the progress made in development of Direct FuelCell/Turbine (DFC/T{reg_sign}) power plants for generation of clean power at very high efficiencies. The DFC/T system employs an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell's byproduct heat in a Brayton cycle. Features of the DFC/T system include: electrical efficiencies of up to 75% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, direct reforming internal to the fuel cell, and potential cost competitiveness with existing combined cycle power plants. Proof-of-concept tests using a sub-MW-class DFC/T power plant at FuelCell Energy's (FCE) Danbury facility were conducted to validate the feasibility of the concept and to measure its potential for electric power production. A 400 kW-class power plant test facility was designed and retrofitted to conduct the tests. The initial series of tests involved integration of a full-size (250 kW) Direct FuelCell stack with a 30 kW Capstone microturbine. The operational aspects of the hybrid system in relation to the integration of the microturbine with the fuel cell, process flow and thermal balances, and control strategies for power cycling of the system, were investigated. A subsequent series of tests included operation of the sub-MW Direct FuelCell/Turbine power plant with a Capstone C60 microturbine. The C60 microturbine extended the range of operation of the hybrid power plant to higher current densities (higher power) than achieved in initial tests using the 30kW microturbine. The proof-of-concept test results confirmed the stability and controllability of operating a fullsize (250 kW) fuel cell stack in combination with a microturbine. Thermal management of the system was confirmed and power plant operation, using the microturbine as the only source of fresh air supply

  11. Harmonics and voltage stability analysis in power systems including ...

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    two parameters affecting power quality – harmonics and voltage stability. ... is necessary to pay attention to energy system stability in the planning, management, and ... where k ∈ {m, m + 1,... ,n} and n is total number of the buses in the system.

  12. Response of unirradiated and irradiated PWR fuel rods tested under power-cooling-mismatch conditions

    International Nuclear Information System (INIS)

    MacDonald, P.E.; Quapp, W.J.; Martinson, Z.R.; McCardell, R.K.; Mehner, A.S.

    1978-01-01

    This report summarizes the results from the single-rod power-cooling-mismatch (PCM) and irradiation effects (IE) tests conducted to date in the Power Burst Facility (PBF) at the U.S. DOE Idaho National Engineering Laboratory. This work was performed for the U.S. NRC under contact to the Department of Energy. These tests are part of the NRC Fuel Behavior Program, which is designed to provide data for the development and verification of analytical fuel behavior models that are used to predict fuel response to abnormal or postulated accident conditions in commercial LWRs. The mechanical, chemical and thermal response of both previously unirradiated and previously irradiated LWR-type fuel rods tested under power-cooling-mismatch condition is discussed. A brief description of the test designs is presented. The results of the PCM thermal-hydraulic studies are summarized. Primary emphasis is placed on the behavior of the fuel and cladding during and after stable film boiling. (orig.) [de

  13. Evaluation of Load Rejection to house load test at 50% power for UCN 3

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chang Gyun; Sohn, Suk Whun; Sohn, Jong Joo; Seo, Jong Tae; Lee, Sang Keun [Korea Power Engineering Company, Inc., Seoul (Korea, Republic of); Kim, Yong Sung; Nam, Kyu Won; Jung, Yang Mook; Chae, Kyeong Sik; Koh, Bum Jae; Oh, Chul Sung; Park, Hee Chool [Korea Electric Power Corporation, Taejon (Korea, Republic of)

    1999-12-31

    The Load Rejection to House Load test at 50% power was successfully performed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3 and 4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design. 3 refs., 8 figs., 1 tab. (Author)

  14. Evaluation of Load Rejection to house load test at 50% power for UCN 3

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chang Gyun; Sohn, Suk Whun; Sohn, Jong Joo; Seo, Jong Tae; Lee, Sang Keun [Korea Power Engineering Company, Inc., Seoul (Korea, Republic of); Kim, Yong Sung; Nam, Kyu Won; Jung, Yang Mook; Chae, Kyeong Sik; Koh, Bum Jae; Oh, Chul Sung; Park, Hee Chool [Korea Electric Power Corporation, Taejon (Korea, Republic of)

    1998-12-31

    The Load Rejection to House Load test at 50% power was successfully performed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3 and 4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design. 3 refs., 8 figs., 1 tab. (Author)

  15. 76 FR 73619 - Quantum Choctaw Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-458-000] Quantum Choctaw Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Quantum...

  16. 78 FR 2984 - Silver Bear Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-01-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-733-000] Silver Bear Power, LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Silver Bear...

  17. Evaluation tests on controbloc, a programmable automaton for nuclear power plants

    International Nuclear Information System (INIS)

    Pralus, B.; Bourassin, J.L.; Varaldi, G.

    1983-01-01

    Controbloc is the programmable automaton used by Electricite de France (EDF) to equip its 1300 MW range of power plants. EDF and the designer CGEE Alsthom have conducted a large number of tests on prototype series equipment to determine whether it matches its specifications. These tests were performed in various laboratories in the Paris area and were concerned with: (1) verifying performance (acquisition, processing and retrieval cycle times - multiplexed exchange performance); (2) the robustness of equipment and its behaviour in industrial conditions (climatic tests in line with IEC regulations - earthquake resistance in particularly severe conditions - resistance to industrial interference); (3) behaviour when internal faults occur, an aspect of particular importance in view of the role played by Controbloc in nuclear power plants; in the event of a failure, safety (incorrect commands must not be given) and availability (resumption of operation) must be guaranteed. A large number of checks have been carried out both by the designer and EDF, the latter having put into operation an original method which is described in the paper. Controbloc has been thoroughly tested and its modular construction has facilitated the performance of these tests. Some shortcomings have been revealed which the designer or EDF has remedied. (author)

  18. 40 CFR 86.1772-99 - Road load power, test weight, and inertia weight class determination.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Road load power, test weight, and inertia weight class determination. 86.1772-99 Section 86.1772-99 Protection of Environment ENVIRONMENTAL... for Light-Duty Vehicles and Light-Duty Trucks § 86.1772-99 Road load power, test weight, and inertia...

  19. Summary of Test Results From a 1 kW(sub e)-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Briggs, Maxwell H.; Geng, Steven M.; Pearson, J. Boise; Godfroy, Thomas J.

    2010-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

  20. New design algorithm and reliability testing of solar powered near ...

    African Journals Online (AJOL)

    New design algorithm and reliability testing of solar powered near-space flight vehicle for defense and security. ... To overcome this problem, we propose a pseudo-satellite system where telecommunication devices are carried on a perpetually flying solar aircraft cruising at stratospheric altitude. Our aircraft will combine ...

  1. Power, Avionics and Software - Phase 1.0:. [Subsystem Integration Test Report

    Science.gov (United States)

    Ivancic, William D.; Sands, Obed S.; Bakula, Casey J.; Oldham, Daniel R.; Wright, Ted; Bradish, Martin A.; Klebau, Joseph M.

    2014-01-01

    This report describes Power, Avionics and Software (PAS) 1.0 subsystem integration testing and test results that occurred in August and September of 2013. This report covers the capabilities of each PAS assembly to meet integration test objectives for non-safety critical, non-flight, non-human-rated hardware and software development. This test report is the outcome of the first integration of the PAS subsystem and is meant to provide data for subsequent designs, development and testing of the future PAS subsystems. The two main objectives were to assess the ability of the PAS assemblies to exchange messages and to perform audio testing of both inbound and outbound channels. This report describes each test performed, defines the test, the data, and provides conclusions and recommendations.

  2. Thermal tests of large recirculation cooling installations for nuclear power plants

    Science.gov (United States)

    Balunov, B. F.; Lychakov, V. D.; Il'in, V. A.; Shcheglov, A. A.; Maslov, O. P.; Rasskazova, N. A.; Rakhimov, R. Z.; Boyarov, R. A.

    2017-11-01

    The article presents the results from thermal tests of some recirculation installations for cooling air in nuclear power plant premises, including the volume under the containment. The cooling effect in such installations is produced by pumping water through their heat-transfer tubes. Air from the cooled room is blown by a fan through a bundle of transversely finned tubes and is removed to the same room after having been cooled. The finning of tubes used in the tested installations was made of Grade 08Kh18N10T and Grade 08Kh18N10 stainless steels or Grade AD1 aluminum. Steel fins were attached to the tube over their entire length by means of high-frequency welding. Aluminum fins were extruded on a lathe from the external tube sheath into which a steel tube had preliminarily been placed. Although the fin extrusion operation was accompanied by pressing the sheath inner part to the steel tube, tight contact between them over the entire surface was not fully achieved. In view of this, the air gap's thermal resistance coefficient was introduced in calculating the heat transfer between the heat-transferring media. The air gap average thickness was determined from the test results taking into account the gap variation with temperature due to different linear expansion coefficients of steel and aluminum. These tests, which are part of the acceptance tests of the considered installations, were carried out at the NPO TsKTI test facility and were mainly aimed at checking if the obtained thermal characteristics were consistent with the values calculated according to the standard recommendations with introduction, if necessary, of modifications to those recommendations.

  3. Test Results From a Pair of 1-kWe Dual-Opposed Free-Piston Stirling Power Convertors Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Geng, Steven M.; Briggs, Maxwell H.; Penswick, L. Barry; Pearson, J. Boise; Godfroy, Thomas J.

    2011-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1-kW-class free-piston Stirling convertors were modified to operate with a NaK (sodium (Na) and potassium (K)) liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The convertors were successfully tested at the Marshall Space Flight Center (MSFC) from June 6 through July 14, 2009. The convertors were operated for a total test time of 66 hr and 16 min. The tests included (a) performance mapping the convertors over various hot- and cold-end temperatures, piston amplitudes, and NaK flow rates and (b) transient test conditions to simulate various startup (i.e., low-, medium-, and high-temperature startups) and fault scenarios (i.e., loss of heat source, loss of NaK pump, convertor stall, etc.). This report documents the results of this testing

  4. The ground testing of a 2 kWe solar dynamic space power system

    International Nuclear Information System (INIS)

    Calogeras, J.E.

    1992-01-01

    Over the past 25 years Space Solar Dynamic component development has advanced to the point where it is considered a leading candidate power source technology for the evolutionary phases of the Space Station Freedom (SSF) program. Selection of SD power was based on studies and analyses which indicated significant savings in life cycle costs, launch mass and EVA requirements were possible when the system is compared to more conventional photovoltaic/battery power systems. Issues associated with micro-gravity operation such as the behavior of the thermal energy storage materials are being addressed in other programs. This paper reports that a ground test of a 2 kWe solar dynamic system is being planned by the NASA Office of Aeronautics and Space Technology to address the integration issues. The test will be scalable up to 25 kWe, will be flight configured and will incorporate relevant features of the SSF Solar Dynamic Power Module design

  5. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 2: core performance and startup physics test reports

    International Nuclear Information System (INIS)

    1977-01-01

    The analyses of four core performance indicators including burnup distribution, reactivity depletion, power distribution, and primary coolant activity are discussed. Information is presented concerning fuel densification monitoring; start-up physics testing; and James River temperature, salinity, fish, biota, and plankton entrainment monitoring

  6. 75 FR 24941 - PBF Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2010-05-06

    ... Marketing LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket... of PBF Power Marketing LLC's application for market-based rate authority, with an accompanying rate... protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To...

  7. Initial results for a 170 GHz high power ITER waveguide component test stand

    Science.gov (United States)

    Bigelow, Timothy; Barker, Alan; Dukes, Carl; Killough, Stephen; Kaufman, Michael; White, John; Bell, Gary; Hanson, Greg; Rasmussen, Dave

    2014-10-01

    A high power microwave test stand is being setup at ORNL to enable prototype testing of 170 GHz cw waveguide components being developed for the ITER ECH system. The ITER ECH system will utilize 63.5 mm diameter evacuated corrugated waveguide and will have 24 >150 m long runs. A 170 GHz 1 MW class gyrotron is being developed by Communications and Power Industries and is nearing completion. A HVDC power supply, water-cooling and control system has been partially tested in preparation for arrival of the gyrotron. The power supply and water-cooling system are being designed to operate for >3600 second pulses to simulate the operating conditions planned for the ITER ECH system. The gyrotron Gaussian beam output has a single mirror for focusing into a 63.5 mm corrugated waveguide in the vertical plane. The output beam and mirror are enclosed in an evacuated duct with absorber for stray radiation. Beam alignment with the waveguide is a critical task so a combination of mirror tilt adjustments and a bellows for offsets will be provided. Analysis of thermal patterns on thin witness plates will provide gyrotron mode purity and waveguide coupling efficiency data. Pre-prototype waveguide components and two dummy loads are available for initial operational testing of the gyrotron. ORNL is managed by UT-Battelle, LLC, for the U.S. Dept. of Energy under Contract DE-AC-05-00OR22725.

  8. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  9. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  10. A study on the effect of gamma background in low power startup physics tests

    International Nuclear Information System (INIS)

    Bae, Chang Joon; Lee, Ki Bog

    1993-01-01

    Low power physics tests should be performed for the domestic pressurized light water reactors (PWRs) after refueling. The tests are performed to ensure that operating characteristics of the core are consistent with predictions and that the core can be operated as designed. But in some low power physics tests, slow but steady reactivity increasing phenomena were noticed after step reactivity insertion by the control rod movement. These reactivity increasing phenomena are due to the low flux level and the gamma backgroud because an uncompensated ion chamber (UIC) is used as the ex-core neutron detector. The gamma background may affect the results of the low power physics tests. The aims of this paper are to analyze the grounds of such phenomena, to simulate a reference bank worth measurement test and to present a resolution quantitatively. In this study, the gamma background level was estimated by numerically solving the point kinetics equations accounting the gamma background effect. The reactivity computer check test was simulated to verify the model. Also, an appropriate neutron flux level was determined by simulating the reference bank worth measurement test. The determined neutron flux level is approximately 0.3 of the nuclear heating flux. This level is about 3 times as high as the current test upper limit specified in the test procedure. Then, the findings from this work were successfully applied to Kori unit 4 cycle 7 and Yonggwang unit 1 cycle 7 physics tests. (Author)

  11. Power recovery method for testing the efficiency of the ECD of an integrated generation unit for offshore wind power and ocean wave energy

    Institute of Scientific and Technical Information of China (English)

    CHEN WeiXing; GAO Feng; MENG XiangDun; REN AnYe; HU Yan

    2017-01-01

    Offshore wind power and ocean wave energy are clean,renewable and rich resources.The integrated generation unit for the two kinds of energy is introduced.The energy conversion device (ECD) is utilized to convert the mechanical energy absorbed from the wind power and wave energy into the hydraulic energy,the conversion efficiency of which is significant.In this paper,a power recovery method for testing the efficiency of the ECD is proposed.A simulation desktop is developed to validate the proposed method.The efficiency of the ECD is influenced by the hydraulic cylinders and the mechanical transmission.Here,the static efficiency of the hydraulic cylinders of the ECD is tested first.The results show that the static mechanical efficiency is about 95 % and that the volumetric efficiency is over 99%.To test the effects induced by the mechanical transmission of the ECD,each hydraulic cylinder of the ECD is substituted with two springs.Then the power loss of the ECDM under different rotational speeds is obtained.Finally,a test platform is built and the efficiency of the ECD under different rotational speeds and pressures is obtained.The results show that the efficiency is about 80%.

  12. Performance test of lower hybrid waveguide under long/high-RF power transmission

    Energy Technology Data Exchange (ETDEWEB)

    Seki, Masami; Obara, Kenjiro; Maebara, Sunao [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; and others

    1996-06-01

    Performance tests of a module for lower hybrid waveguides were carried out at the CEA Cadarache RF Test Facility. For the experiments the test module was fabricated by JAERI, the transmission line of the test bed was modified and the connection waveguides were manufactured by CEA. As the results, the thermal treatment by baking at a higher temperature was the most effective for reducing outgassing during injection of high RF power. The outgassing strongly depended on the temperature of the test module, but was independent to initial temperature. The RF injection reduced outgassing. The outgassing rate decreased to a low level of 10{sup -6}-10{sup -5} Pa m{sup 3}/sec m{sup 2} (10{sup -9}-10{sup -8} Torr 1/sec cm{sup 2}) at 400degC after 450degC-baking. The gas injection did not affect outgassing before and during RF injection. The baking under H{sub 2} or D{sub 2} gas atmosphere were not so effective for reducing outgassing rate. The outgassing rate did not depend on input RF power densities. The temperature in central part of the test module saturated to be {approx}100degC by using of water cooling at a power level of 150 MW/m{sup 2} RF injection, and a neutral gas pressure decreased gradually. In the water cooling case, the outgassing rate was very low less than 10{sup -7} Pa m{sup 3}/sec m{sup 2} (10{sup -10} Torr 1/sec cm{sup 2}). The steady state RF injection was demonstrated with water cooling. (author).

  13. Validity of the RAST for evaluating anaerobic power performance as compared to Wingate test in cycling athletes

    Directory of Open Access Journals (Sweden)

    Marcos Roberto Queiroga

    2013-12-01

    Full Text Available The validity of the Running-based Anaerobic Sprint Test (RAST was investigated to evaluate the anaerobic power performance in comparison to Wingate test in cycling athletes. Ten mountain-bike male cyclists (28.0±7.3 years randomly performed Wingate Test and RAST with two trials each. After several anthropometric measurements, peak power (PP, mean power (MP and fatigue index (FI for RAST and Wingate Test were analyzed using Student's paired t-test, Pearson's linear correlation test (r and Bland and Altman's plots. Results showed that, with the exception of FI (33.8±4.6% vs. 37.8±7.9%; r=0.172, significant differences were detected between the Wingate and RAST tests with regard to PP and MP. Although there was a strong correlation for PP and MP, or rather, 0.831 and 0.714 respectively, agreement of analysis between Wingate and RAST protocols was low. The above suggested that RAST was not appropriate to evaluate the performance of anaerobic power by Wingate test in cycling athletes.

  14. Performance testing of self-powered detector signal converters at Dukovany nuclear power plant - stage 1

    International Nuclear Information System (INIS)

    Erben, O.; Hajek, P.; Zerola, L.; Karsulin, M.

    1990-11-01

    The converters were manufactured at the Institute of Nuclear Research, Rez. Dynamic functions of the converters were tested during the start-up of reactor unit 4, Dukovany nuclear power plant, and their stability during its normal operation. The results and evaluation of the measurements show a good performance of converters. They have a low offset, good stability and the values of current are in a good agreement with the values obtained using other methods. The values of insulation resistance are in a good agreement with the values obtained manually using the method of additional resistance. These converters are planned to be used in the upgraded in-service inspection system in WWER-440 nuclear power plants. (Z.S.) 9 tabs., 22 figs., 1 ref

  15. Power ramp performance of some 15 x 15 PWR test fuel rods tested in the STUDSVIK SUPER-RAMP and SUPER-RAMP extension projects

    International Nuclear Information System (INIS)

    Djurle, S.

    2000-01-01

    This paper presents results obtained from the STUDSVIK SUPER-RAMP (SR) and SUPER-RAMP EXTENSION (SRX) projects. As parts of these projects test fuel rods of the same PWR type were base irradiated in the Obrigheim power reactor and power ramp tested in the STUDSVIK R2 reactor. Some of the rods were ramped using an inlet coolant water temperature 50 deg. C below the normal one. Fabricated data on the test fuel rods are presented as well as data on the base irradiation, interim examination, conditioning irradiation, power ramp irradiation and results of the post irradiation examination. The data on the change of diameter at ridges due to power ramping have shown that a lower clad temperature during ramping leads to smaller deformations. Most likely this may be explained as due to a smaller creep rate in the cladding at the lower temperature, resulting in a more severe stress situation. The combination of low cladding temperature, high ramp terminal level and the presence of a stress corrosion agent may have caused the failure of one of the test rods. (author)

  16. Modeling, Simulation, and Testing of Surf Kites for Power Generation

    NARCIS (Netherlands)

    Williams, P.; Lansdorp, B.; Ruiterkamp, R.; Ockels, W.J.

    2008-01-01

    Non-powered flight vehicles such as kites can provide a means of transmitting wind energy from higher altitudes to the ground via tethers. At Delft University of Technology, construction and testing of such a high altitude wind machine is ongoing. The concept is called the Laddermill. It generates

  17. The Relationship between Field Tests of Anaerobic Power and 10-km Run Performance.

    Science.gov (United States)

    Sinnett, Aaron M.; Berg, Kris; Latin, Richard W.; Noble, John M.

    2001-01-01

    Investigated the relationship between several field tests of anaerobic power (e.g., +various sprints, vertical jumps, and a plyometric leap) and distance running performance in trained adult male and female runners. Results indicate that anaerobic power is significantly related to distance running performance and may explain a meaningful…

  18. Sex Ratios, Economic Power, and Women's Roles: A Theoretical Extension and Empirical Test.

    Science.gov (United States)

    South, Scott J.

    1988-01-01

    Tested hypotheses concerning sex ratios, women's roles, and economic power with data from 111 countries. Found undersupply of women positively associated with proportion of women who marry and fertility rate; inversely associated with women's average age at marriage, literacy rate, and divorce rate. Suggests women's economic power may counteract…

  19. Radiation monitoring data on the power-up test of HTTR. Results up to 20 MW operation

    International Nuclear Information System (INIS)

    Ashikagaya, Yoshinobu; Nakazawa, Takashi; Yoshino, Toshiaki; Yasu, Katsuji

    2002-01-01

    The High Temperature Engineering Test Reactor (HTTR) have completed the Power-up test of 9 MW (the single and parallel loaded operation) in the rated operation mode. After that the Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW (the single and parallel loaded operation) were performed between January 16, 2001 and June 10, 2001. This report describes the radiation monitoring data carried out during the HTTR Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW. The followings were concluded from these radiation monitoring data. The monitoring of radioactive gaseous effluents and the radiation protection for the works will be easy to do and the exposure dose of the workers will be kept the low level. (author)

  20. Evaluating Upper-Body Strength and Power From a Single Test: The Ballistic Push-up.

    Science.gov (United States)

    Wang, Ran; Hoffman, Jay R; Sadres, Eliahu; Bartolomei, Sandro; Muddle, Tyler W D; Fukuda, David H; Stout, Jeffrey R

    2017-05-01

    Wang, R, Hoffman, JR, Sadres, E, Bartolomei, S, Muddle, TWD, Fukuda, DH, and Stout, JR. Evaluating upper-body strength and power from a single test: the ballistic push-up. J Strength Cond Res 31(5): 1338-1345, 2017-The purpose of this study was to examine the reliability of the ballistic push-up (BPU) exercise and to develop a prediction model for both maximal strength (1 repetition maximum [1RM]) in the bench press exercise and upper-body power. Sixty recreationally active men completed a 1RM bench press and 2 BPU assessments in 3 separate testing sessions. Peak and mean force, peak and mean rate of force development, net impulse, peak velocity, flight time, and peak and mean power were determined. Intraclass correlation coefficients were used to examine the reliability of the BPU. Stepwise linear regression was used to develop 1RM bench press and power prediction equations. Intraclass correlation coefficient's ranged from 0.849 to 0.971 for the BPU measurements. Multiple regression analysis provided the following 1RM bench press prediction equation: 1RM = 0.31 × Mean Force - 1.64 × Body Mass + 0.70 (R = 0.837, standard error of the estimate [SEE] = 11 kg); time-based power prediction equation: Peak Power = 11.0 × Body Mass + 2012.3 × Flight Time - 338.0 (R = 0.658, SEE = 150 W), Mean Power = 6.7 × Body Mass + 1004.4 × Flight Time - 224.6 (R = 0.664, SEE = 82 W); and velocity-based power prediction equation: Peak Power = 8.1 × Body Mass + 818.6 × Peak Velocity - 762.0 (R = 0.797, SEE = 115 W); Mean Power = 5.2 × Body Mass + 435.9 × Peak Velocity - 467.7 (R = 0.838, SEE = 57 W). The BPU is a reliable test for both upper-body strength and power. Results indicate that the mean force generated from the BPU can be used to predict 1RM bench press, whereas peak velocity and flight time measured during the BPU can be used to predict upper-body power. These findings support the potential use of the BPU as a valid method to evaluate upper-body strength and power.

  1. Application of wire sawing method to decommissioning of nuclear power plant. Cutting test with turbine pedestal of thermal power plant

    International Nuclear Information System (INIS)

    Hasegawa, Hideki; Uchiyama, Noriyuki; Sugiyama, Kazuya; Yamashita, Yoshitaka; Watanabe, Morishige

    1995-01-01

    It is very important to reduce radioactive waste volume, and to reduce radiation dose to workers and to the public during dismantling of the activated concrete in the decommissioning stage of a nuclear power plant. For the above, we studied a dismantling method which can separate activated concrete from non-activated concrete safely and effectively. Considering the state of legal regulation about radioactive waste disposal, and the state of developing of decommissioning technologies, we come to a conclusion that wire sawing method is feasible as a concrete cutting method. This study was carried out to evaluate the availability of the wire sawing method to dismantling of concrete structures of nuclear power plants. This study consists of concrete cutting rate test and concrete block cutting test. The former is to obtain data about cutting rate with various steel ratios while the latter is to obtain data about working time and man hour of the whole work with wire sawing. Thirty-six year old turbine pedestal of a thermal power plant was selected as a test piece to simulate actual decommissioning work of nuclear power plant, taking its massive concrete volume and age. Taking account of the handling in the building, the wire sawing machine with motor driven was used in this study considering that it did not produce exhaust gas. The concrete cutting rate test was performed with parameter of steel ratio in the concrete, wire tension and cutting direction. In the concrete block cutting test, imaging the actual cutting situation, cubic blocks which side was approximately 1 meter were taken out, and a large block to be cut and to be taken out is a section of 1m x 1.5m x 10m. Test results are shown below. The difference of cutting rate was mainly caused by the difference of reinforcement steel ratio. Working time data of installation, removal of machines and cutting were obtained. Data on secondary waste (dust, drainage and sludge) and environmental effect (noise and

  2. The Design and Implementation of Test System Based on Programmable Excitation Power Supply for Mining Comprehensive Protector

    Directory of Open Access Journals (Sweden)

    Zhi-jie Zhang

    2013-11-01

    Full Text Available As comprehensive protectors for coal mining (referred to comprehensive protectors in use are prone to fail, it can timely screen out the invalid comprehensive protector by periodic functional test when it is used (it is called test in use to ensure the production safety. The test in use needs the specialized test equipment, which is not used in delivery inspection by the manufacturers of comprehensive protectors. Thus, testing excitation power becomes a constraint for the improvement of the accuracy of test in use and the degree of automation. To solve the problem, this paper developed a power frequency programmed input-output testing excitation power supply, and on that basis it also realized the mining comprehensive protector test system in use with the excitation circuit and voltage program-controlled output.

  3. Development of high power CW and pulsed RF test facility based on 1 MW, 352.2 MHz klystron amplifier

    International Nuclear Information System (INIS)

    Badapanda, M.K.; Tripathi, Akhilesh; Upadhyay, Rinki; Rao, J.N.; Tiwari, Ashish; Jain, Akhilesh; Lad, M.R.; Hannurkar, P.R.

    2013-01-01

    A high power 1 MW, 352.2 MHz RF Test facility having CW and Pulse capability is being developed at Raja Ramanna Centre for Advanced Technology (RRCAT), Indore for performance evaluation of various RF components, accelerating structures and related subsystems. Thales make 1 MW, 352.2 MHz klystron amplifier (TH 2089) will be employed in this high power test facility, which is thoroughly tested for its performance parameters at rated operating conditions. Auxiliary power supplies like filament, electromagnet, ion pump and mod anode power supply as well as 200 W solid state driver amplifier necessary for this high power test facility have been developed. A high voltage floating platform is created for floating filament and mod anode power supplies. Interconnection of various power supplies and other subsystems of this test facility are being carried out. A high voltage 100 kV, 25 Amp DC crowbar less power supply and low conductivity water (LCW) plant required for this klystron amplifier are in advanced stage of development. NI make cRIO 9081 real time (RT) controller based control and interlock system has been developed to realize proper sequence of operation of various power supplies and to monitor the status of crucial parameters in this test facility. This RF test facility will provide confidence for development of RF System of future accelerators like SNS and ADSS. (author)

  4. Ion exchange media testing for processing recyclable and nonrecyclable liquids at Diablo Canyon Power Plant

    International Nuclear Information System (INIS)

    James, K.L.; Miller, C.C.

    1989-01-01

    This paper reports on several ion exchange materials tested for processing nonrecyclable and recyclable liquid wastes at Diablo Canyon Power Plant. These ion exchange materials include inorganic Durasil media, natural and synthetic zeolites, and various organic resins. Additional tests were performed using a polyelectrolyte pretreatment technique to enhance processing of liquid wastes by ion exchange. A 9:1 ratio of cation to anion resin, consisting of IRN-77 and Sybron A-642 was effective in decontaminating cesium and cobalt radionuclides for low conductivity nonrecyclable liquids. A mixture of zeolite and Durasil media was most effective in removing cesium and cobalt from nonrecyclable high conductivity liquids. The experimental Dow resins achieved the best results in decontaminating recyclable liquids and minimized the effluent levels of chlorides, sulfates, and silica

  5. Low Level RF Including a Sophisticated Phase Control System for CTF3

    CERN Document Server

    Mourier, J; Nonglaton, J M; Syratchev, I V; Tanner, L

    2004-01-01

    CTF3 (CLIC Test Facility 3), currently under construction at CERN, is a test facility designed to demonstrate the key feasibility issues of the CLIC (Compact LInear Collider) two-beam scheme. When completed, this facility will consist of a 150 MeV linac followed by two rings for bunch-interleaving, and a test stand where 30 GHz power will be generated. In this paper, the work that has been carried out on the linac's low power RF system is described. This includes, in particular, a sophisticated phase control system for the RF pulse compressor to produce a flat-top rectangular pulse over 1.4 µs.

  6. Power Performance Verification of a Wind Farm Using the Friedman’s Test

    Science.gov (United States)

    Hernandez, Wilmar; López-Presa, José Luis; Maldonado-Correa, Jorge L.

    2016-01-01

    In this paper, a method of verification of the power performance of a wind farm is presented. This method is based on the Friedman’s test, which is a nonparametric statistical inference technique, and it uses the information that is collected by the SCADA system from the sensors embedded in the wind turbines in order to carry out the power performance verification of a wind farm. Here, the guaranteed power curve of the wind turbines is used as one more wind turbine of the wind farm under assessment, and a multiple comparison method is used to investigate differences between pairs of wind turbines with respect to their power performance. The proposed method says whether the power performance of the specific wind farm under assessment differs significantly from what would be expected, and it also allows wind farm owners to know whether their wind farm has either a perfect power performance or an acceptable power performance. Finally, the power performance verification of an actual wind farm is carried out. The results of the application of the proposed method showed that the power performance of the specific wind farm under assessment was acceptable. PMID:27271628

  7. Power Performance Verification of a Wind Farm Using the Friedman’s Test

    Directory of Open Access Journals (Sweden)

    Wilmar Hernandez

    2016-06-01

    Full Text Available In this paper, a method of verification of the power performance of a wind farm is presented. This method is based on the Friedman’s test, which is a nonparametric statistical inference technique, and it uses the information that is collected by the SCADA system from the sensors embedded in the wind turbines in order to carry out the power performance verification of a wind farm. Here, the guaranteed power curve of the wind turbines is used as one more wind turbine of the wind farm under assessment, and a multiple comparison method is used to investigate differences between pairs of wind turbines with respect to their power performance. The proposed method says whether the power performance of the specific wind farm under assessment differs significantly from what would be expected, and it also allows wind farm owners to know whether their wind farm has either a perfect power performance or an acceptable power performance. Finally, the power performance verification of an actual wind farm is carried out. The results of the application of the proposed method showed that the power performance of the specific wind farm under assessment was acceptable.

  8. Instantaneous response spectrum in seismic testing of nuclear power plant equipment

    International Nuclear Information System (INIS)

    Morrone, A.

    1977-01-01

    This paper presents the concept of instantaneous response spectrum (IRS) as the response of single degree of freedom oscillators at a particular time. It demonstrates that a shake table random motion whose standard TRS envelops the RRS does not necessarily satisfy the enveloping requirement instantaneously. That is, any one (or more) instantaneous required response spectrum (IRRS) is not enveloped by any instantaneous test response spectrum (ITRS). Response spectra from different time histories, including single frequency sine beat motion used in resonance testing, are compared for enveloping with maximum response and with the actual response at particular times. These comparisons are given for the enveloping of RRS and IRRS derived with a time history response calculated at a particular building elevation of a nuclear power plant. For the test motion, several of the most severe ITRS derived with a modified EL Centro motion and with a sine beat motion with ten cycles per beat were used. It is shown that although the TRS with the modified EL Centro motion enveloped the given RRS, the selected modified EL Centro ITRS did not envelop the corresponding IRRS. With the sine beat motion, even though the TRS did not fully envelop the given RRS, the resulting sine beat ITRS did not require a larger factor for full IRRS enveloping than those of the modified EL Centro motion

  9. Reliability and Sensitivity of the Power Push-up Test for Upper-Body Strength and Power in 6-15-Year-Old Male Athletes.

    Science.gov (United States)

    Gillen, Zachary M; Miramonti, Amelia A; McKay, Brianna D; Jenkins, Nathaniel D M; Leutzinger, Todd J; Cramer, Joel T

    2018-01-01

    Gillen, ZM, Miramonti, AA, McKay, BD, Jenkins, NDM, Leutzinger, TJ, and Cramer, JT. Reliability and sensitivity of the power push-up test for upper-body strength and power in 6-15-year-old male athletes. J Strength Cond Res 32(1): 83-96, 2018-The power push-up (PPU) test is an explosive upper-body test performed on a force plate and is currently being used in high school football combines throughout the United States. The purpose of this study was to quantify the reliability of the PPU test based on age and starting position (knees vs. toes) in young athletes. Sixty-eight boys (mean ± SD; age = 10.8 ± 2.0 years) were tested twice over 5 days. Boys were separated by age as 6-9 years (n = 16), 10-11 years (n = 26), and 12-15 years (n = 26). The PPU test was performed on a force plate while rotating from the knees vs. the toes. Measurements were peak force (PF, N), peak rate of force development (pRFD, N·s), average power (AP, W), and peak power (PP, W). Intraclass correlation coefficients (ICC2,1), SEMs, coefficients of variation (CVs), and minimum detectable changes (MDCs) were calculated to quantify reliability and sensitivity. Peak force from the knees in 10-15-year-olds, PF from the toes in 12-15-year-olds, and pRFD from the knees and toes in 12-15-year-olds were comparably reliable (ICC ≥ 0.84). Neither power measurements (AP or PP) for any age group, nor any measurements (PF, pRFD, AP, or PP) for the 6-9-year-olds were comparably reliable (ICC ≤ 0.74). When considering the reliable variables, PF was greater in the 12-15-year-olds than in 10-11-year-olds (p ≤ 0.05). In addition, in 12-15-year-olds, PF and pRFD were greater from the knees than from the toes (p ≤ 0.05). For reasons largely attributable to growth and development, the PPU test may be a reliable (ICC ≥ 0.80) and sensitive (CV ≤ 19%) measure of upper-body strength (PF), whereas pRFD was also reliable (ICC ≥ 0.80), but less sensitive (CV = 30-38%) in 10-15-year-old male athletes.

  10. Forced vibration tests on the reactor building of a nuclear power station, 1

    International Nuclear Information System (INIS)

    Takeda, Toshikazu; Tsunoda, Tomohiko; Wakamatsu, Kunio; Kaneko, Masataka; Nakamura, Mitsuru; Kunoh, Toshio; Murahashi, Hisahiro

    1988-01-01

    Tsuruga Unit No.2 Nuclear Power Station of the Japan Atomic Power Company is the first PWR-type 4-loop plant constructed in Japan with a prestressed concrete containment vessel (PCCV). This report describes forced vibration tests carried out on the reactor building of this plant. The following were obtained as results: (1) The results of the forced vibration tests corresponded well on the whole with design values. (2) The vibration characteristics of the PCCV observed in the tests after prestressing are no different from the ones before prestressing. This shows that the vibration properties of the PCCV are practically independent of prestressing loads. (3) A seismic response analysis of the design basis earthquake was made on the design model reflecting the test results. The seismic safety of the plant was confirmed by this analysis. (author)

  11. Intersection tests for single marker QTL analysis can be more powerful than two marker QTL analysis

    Directory of Open Access Journals (Sweden)

    Doerge RW

    2003-06-01

    Full Text Available Abstract Background It has been reported in the quantitative trait locus (QTL literature that when testing for QTL location and effect, the statistical power supporting methodologies based on two markers and their estimated genetic map is higher than for the genetic map independent methodologies known as single marker analyses. Close examination of these reports reveals that the two marker approaches are more powerful than single marker analyses only in certain cases. Simulation studies are a commonly used tool to determine the behavior of test statistics under known conditions. We conducted a simulation study to assess the general behavior of an intersection test and a two marker test under a variety of conditions. The study was designed to reveal whether two marker tests are always more powerful than intersection tests, or whether there are cases when an intersection test may outperform the two marker approach. We present a reanalysis of a data set from a QTL study of ovariole number in Drosophila melanogaster. Results Our simulation study results show that there are situations where the single marker intersection test equals or outperforms the two marker test. The intersection test and the two marker test identify overlapping regions in the reanalysis of the Drosophila melanogaster data. The region identified is consistent with a regression based interval mapping analysis. Conclusion We find that the intersection test is appropriate for analysis of QTL data. This approach has the advantage of simplicity and for certain situations supplies equivalent or more powerful results than a comparable two marker test.

  12. A practical approach for implementing risk-based inservice testing of pumps at nuclear power plants

    International Nuclear Information System (INIS)

    Hartley, R.S.; Maret, D.; Seniuk, P.; Smith, L.

    1996-01-01

    The American Society of Mechanical Engineers (ASME) Center for Research and Technology Development's (CRTD) Research Task Force on Risk-Based Inservice Testing has developed guidelines for risk-based inservice testing (IST) of pumps and valves. These guidelines are intended to help the ASME Operation and Maintenance (OM) Committee to enhance plant safety while focussing appropriate testing resources on critical components. This paper describes a practical approach for implementing those guidelines for pumps at nuclear power plants. The approach, as described in this paper, relies on input, direction, and assistance from several entities such as the ASME Code Committees, United States Nuclear Regulatory Commission (NRC), and the National Laboratories, as well as industry groups and personnel with applicable expertise. Key parts of the risk-based IST process that are addressed here include: identification of important failure modes, identification of significant failure causes, assessing the effectiveness of testing and maintenance activities, development of alternative testing and maintenance strategies, and assessing the effectiveness of alternative testing strategies with present ASME Code requirements. Finally, the paper suggests a method of implementing this process into the ASME OM Code for pump testing

  13. A practical approach for implementing risk-based inservice testing of pumps at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, R.S. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Maret, D.; Seniuk, P.; Smith, L.

    1996-12-01

    The American Society of Mechanical Engineers (ASME) Center for Research and Technology Development`s (CRTD) Research Task Force on Risk-Based Inservice Testing has developed guidelines for risk-based inservice testing (IST) of pumps and valves. These guidelines are intended to help the ASME Operation and Maintenance (OM) Committee to enhance plant safety while focussing appropriate testing resources on critical components. This paper describes a practical approach for implementing those guidelines for pumps at nuclear power plants. The approach, as described in this paper, relies on input, direction, and assistance from several entities such as the ASME Code Committees, United States Nuclear Regulatory Commission (NRC), and the National Laboratories, as well as industry groups and personnel with applicable expertise. Key parts of the risk-based IST process that are addressed here include: identification of important failure modes, identification of significant failure causes, assessing the effectiveness of testing and maintenance activities, development of alternative testing and maintenance strategies, and assessing the effectiveness of alternative testing strategies with present ASME Code requirements. Finally, the paper suggests a method of implementing this process into the ASME OM Code for pump testing.

  14. The power of reachability testing for timed automata

    DEFF Research Database (Denmark)

    Aceto, Luca; Bouyer, Patricia; Burgueno, A.

    2003-01-01

    The computational engine of the verification tool UPPAAL consists of a collection of efficient algorithms for the analysis of reachability properties of systems. Model-checking of properties other than plain reachability ones may currently be carried out in such a tool as follows. Given a propert...... be reached. Finally, the property language characterizing the power of reachability testing is used to provide a definition of characteristic properties with respect to a timed version of the ready simulation preorder, for nodes of tau-free, deterministic timed automata....

  15. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  16. Development and Testing of a Laser-Powered Cryobot for Outer Planet Icy Moon Exploration

    Science.gov (United States)

    Siegel, V.; Stone, W.; Hogan, B.; Lelievre, S.; Flesher, C.

    2013-12-01

    Project VALKYRIE (Very-deep Autonomous Laser-powered Kilowatt-class Yo-yoing Robotic Ice Explorer) is a NASA-funded effort to develop the first laser powered cryobot - a self-contained intelligent ice penetrator capable of delivering science payloads through ice caps of the outer planet icy moons. The long range objective is to enable a full-scale Europa lander mission in which an autonomous life-searching underwater vehicle is transported by the cryobot and launched into the sub-surface Europan ocean. Mission readiness testing will involve an Antarctic sub-glacial lake cryobot sample return through kilometers of ice cap thickness. A key element of VALKYRIE's design is the use of a high energy laser as the primary power source. 1070 nm laser light is transmitted at a power level of 5 kW from a surface-based laser and injected into a custom-designed optical waveguide that is spooled out from the descending cryobot. Light exits the downstream end of the fiber, travels through diverging optics, and strikes a beam dump, which channels thermal power to hot water jets that melt the descent hole. Some beam energy is converted, via photovoltaic cells, to electricity for running onboard electronics and jet pumps. Since the vehicle can be sterilized prior to deployment and the melt path freezes behind it, preventing forward contamination, expansions on VALKYRIE concepts may enable cleaner and faster access to sub-glacial Antarctic lakes. Testing at Stone Aerospace between 2010 and 2013 has already demonstrated high power optical energy transfer over relevant (kilometer scale) distances as well as the feasibility of a vehicle-deployed optical waveguide (through which the power is transferred). The test vehicle is equipped with a forward-looking synthetic aperture radar (SAR) that can detect obstacles out to 1 kilometer from the vehicle. The initial ASTEP test vehicle will carry a science payload consisting of a DUV flow cytometer and a water sampling sub-system that will be

  17. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Road load power, test weight, inertia... Procedures § 86.129-94 Road load power, test weight, inertia weight class determination, and fuel temperature... duty trucks 1,2,3 Test weightbasis 4,5 Test equivalent test weight(pounds) Inertia weight class(pounds...

  18. Perform qualify reliability-power tests by shooting common mistakes: practical problems and standard answers per Telcordia/Bellcore requests

    Science.gov (United States)

    Yu, Zheng

    2002-08-01

    Facing the new demands of the optical fiber communications market, almost all the performance and reliability of optical network system are dependent on the qualification of the fiber optics components. So, how to comply with the system requirements, the Telcordia / Bellcore reliability and high-power testing has become the key issue for the fiber optics components manufacturers. The qualification of Telcordia / Bellcore reliability or high-power testing is a crucial issue for the manufacturers. It is relating to who is the outstanding one in the intense competition market. These testing also need maintenances and optimizations. Now, work on the reliability and high-power testing have become the new demands in the market. The way is needed to get the 'Triple-Win' goal expected by the component-makers, the reliability-testers and the system-users. To those who are meeting practical problems for the testing, there are following seven topics that deal with how to shoot the common mistakes to perform qualify reliability and high-power testing: ¸ Qualification maintenance requirements for the reliability testing ¸ Lots control for preparing the reliability testing ¸ Sampling select per the reliability testing ¸ Interim measurements during the reliability testing ¸ Basic referencing factors relating to the high-power testing ¸ Necessity of re-qualification testing for the changing of producing ¸ Understanding the similarity for product family by the definitions

  19. MODELING OF POWER SYSTEMS AND TESTING OF RELAY PROTECTION DEVICES IN REAL AND MODEL TIME

    Directory of Open Access Journals (Sweden)

    I. V. Novash

    2017-01-01

    Full Text Available The methods of modelling of power system modes and of testing of relay protection devices with the aid the simulation complexes in real time and with the help of computer software systems that enables the simulation of virtual time scale are considered. Information input protection signals in the simulation of the virtual model time are being obtained in the computational experiment, whereas the tests of protective devices are carried out with the help of hardware and software test systems with the use of estimated input signals. Study of power system stability when modes of generating and consuming electrical equipment and conditions of devices of relay protection are being changed requires testing with the use of digital simulators in a mode of a closed loop. Herewith feedbacks between a model of the power system operating in a real time and external devices or their models must be determined (modelled. Modelling in real time and the analysis of international experience in the use of digital simulation power systems for real-time simulation (RTDS simulator have been fulfilled. Examples are given of the use of RTDS systems by foreign energy companies to test relay protection systems and control, to test the equipment and devices of automatic control, analysis of cyber security and evaluation of the operation of energy systems under different scenarios of occurrence of emergency situations. Some quantitative data on the distribution of RTDS in different countries and Russia are presented. It is noted that the leading energy universities of Russia use the real-time simulation not only to solve scientific and technical problems, but also to conduct training and laboratory classes on modelling of electric networks and anti-emergency automatic equipment with the students. In order to check serviceability of devices of relay protection without taking into account the reaction of the power system tests can be performed in an open loop mode with the

  20. Advanced communications technology satellite high burst rate link evaluation terminal power control and rain fade software test plan, version 1.0

    Science.gov (United States)

    Reinhart, Richard C.

    1993-01-01

    The Power Control and Rain Fade Software was developed at the NASA Lewis Research Center to support the Advanced Communications Technology Satellite High Burst Rate Link Evaluation Terminal (ACTS HBR-LET). The HBR-LET is an experimenters terminal to communicate with the ACTS for various experiments by government, university, and industry agencies. The Power Control and Rain Fade Software is one segment of the Control and Performance Monitor (C&PM) Software system of the HBR-LET. The Power Control and Rain Fade Software automatically controls the LET uplink power to compensate for signal fades. Besides power augmentation, the C&PM Software system is also responsible for instrument control during HBR-LET experiments, control of the Intermediate Frequency Switch Matrix on board the ACTS to yield a desired path through the spacecraft payload, and data display. The Power Control and Rain Fade Software User's Guide, Version 1.0 outlines the commands and procedures to install and operate the Power Control and Rain Fade Software. The Power Control and Rain Fade Software Maintenance Manual, Version 1.0 is a programmer's guide to the Power Control and Rain Fade Software. This manual details the current implementation of the software from a technical perspective. Included is an overview of the Power Control and Rain Fade Software, computer algorithms, format representations, and computer hardware configuration. The Power Control and Rain Fade Test Plan provides a step-by-step procedure to verify the operation of the software using a predetermined signal fade event. The Test Plan also provides a means to demonstrate the capability of the software.

  1. Simulation of power maneuvering experiment of MASLWR test facility by MARS-KS code

    Energy Technology Data Exchange (ETDEWEB)

    Park, Ju Yeop [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-10-15

    In this ICSP, experimental data obtained from MASLWR (Mulit-Application Small Light Water Reactor) test facility located at Oregon state university in the US have been simulated by various thermal-hydraulic codes of each participant of the ICSP and compared among others. MASLWR test facility is a mock-up of a passive integral type reactor equipped with helical coil steam generator. Since SMART reactor which is currently being developed in Korea also adopts a helical coil steam generator, Korea Institute of Nuclear Safety (KINS) has joined this ICSP to assess the applicability of a domestic regulatory audit thermal-hydraulic code (i. e. MARS-KS code) for the SMART reactor including wall-to-fluid heat transfer model modification based on independent international experiment data. In the ICSP, two types of transient experiments have been focused and they are 1) loss of feedwater transient with subsequent ADS operation and long term cooling (SP-2) and normal operating conditions at different power levels. In the present study, KINS simulation result by the MARS-KS code (KS-002 version) for the SP-3 experiment is presented in detail and conclusion on MARS-KS code performance drawn through this simulation is described. Performance of the MARS-KS code is evaluated through the simulation of the power maneuvering experiment of the MASLWR test facility. Steady run shows the helical coil specific heat transfer model of the code is reasonable. However, identified discrepancy of the primary mass flowrate at transient run shows code performance for pressure drop needs to be improved considering sensitivity of the flowrate to the pressure drop at natural circulation.

  2. Concerning tests of time-reversal invariance via the polarization-analyzing power equality

    International Nuclear Information System (INIS)

    Conzett, H.E.

    1982-01-01

    Previous tests of time-reversal invariance via comparisons of polarizations and analyzing powers in nuclear scattering have been examined. It is found that all of these comparisons fail as adequate tests of time-reversal invariance either because of a lack of experimental precision or the lack of sensitivity to any time-reversal symmetry violation

  3. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  4. Mobile test stand for evaluation of electric power plants for unmanned aircraft

    Directory of Open Access Journals (Sweden)

    Serbezov Vladimir

    2017-01-01

    Full Text Available The absence of accurate performance data is a common problem with most civilian unmanned aerial vehicle (UAV power plant producers. The reasons for this are the small size of most of the manufacturers and the high price of precise wind tunnel testing and computer simulations. To overcome this problem at Dronamics Ltd., with support from the Department of Aeronautics of TU-Sofia, a mobile test stand for evaluation of electric power plants for unmanned aircraft was developed. The stand may be used statically, or may be installed on the roof of an automobile. The measurement system of the stand is based on popular hardware that is used in radio controlled models and in general automation. The verification of the measurement system is performed by comparing static test results with data published by the manufacturer of the tested electric motor. Tests were carried out with 2 different types of propellers and the results were compared with published results for common propellers as well as with results of theoretical studies. The results are satisfactory for practical applications. The use of this type of test stands can be a cheap and effective alternative for research and development start-up companies like Dronamics.

  5. Full scale vibration test on nuclear power plant auxiliary building: Part I

    International Nuclear Information System (INIS)

    Langer, V.; Tinic, S.; Berger, E.; Zwicky, P.; Prater, E.G.

    1987-01-01

    In connection with the construction of the reinforced concrete auxiliary building housing the two boric water tanks (so-called BOTA building) of the Beznau Nuclear Power Plant in Switzerland the opportunity was given to carry out full scale vibration tests in November 1985. The overall aim of the tests was to validate computational models and parameters widely used in the seismic analysis of the structures and critical components of nuclear power plants. The scope of the experimental investigation was the determination of the eigenfrequencies and damping values for the fundamental soil-structure interaction (SSI) modes. The excitation level was aimed to be as high as feasibly possible. A working group was formed of representatives of the owner, NOK, the consulting firm Basler and Hofmann and the ETH to supervise the project. The project's main phases were the planning and execution of the tests, the evaluation of recorded data, numerical simulation of the tests using different computer models and finally the comparison and interpretation of measured and computed results

  6. Results of gap conductance tests in the power burst facility

    International Nuclear Information System (INIS)

    Garner, R.W.; Sparks, D.T.

    1977-01-01

    Light water reactor (LWR) fuel rod behavior studies are being conducted by the Thermal Fuels Behavior Program of EG and G Idaho, Inc. These studies are being performed under contract to the Energy Research and Development Adminstration at the Idaho National Engineering Laboratory (INEL), as part of the Nuclear Regulatory Commission's Water Reactor Safety Research Fuel Behavior Program. Experimental data for verification of analytical models developed to predict light water nuclear fuel rod behavior under normal and postulated accident conditions are being obtained from a variety of in-reactor and out-of-reactor experiments. This paper summarizes the results of tests performed in the Power Burst Facility (PBF) to obtain data from which the thermal response, gap conductance, and stored energy of LWR fuel rods can be determined. Primary objectives of the PBF gap conductance test program are (a) to obtain data on a variety of pressurized water reactor (PWR) and boiling water reactor (BWR) fuel rod designs, under a wide range of operating conditions, from which gap conductance values can be determined and (b) to evaluate experimentally the power oscillation method for measuring the gap conductance and thermal response of a fresh or burned LWR fuel rod. Tests have been performed with both irradiated and unirradiated PWR-type fuel and with fresh BWR-type fuel rods. Some PWR rod test results are described, and the thermal response data from BWR rod tests are discussed in greater detail. Comparisons are made of gap conductance values determined by the tests with analytically calculated values using the Fuel Rod Analysis Program-Transient (FRAP-T) computer code. These comparisons provide insight into both the experimental measurements methods and the validity of the gap conductance models

  7. 78 FR 71676 - NUREG-1482, Revision 2, “Guidelines for Inservice Testing at Nuclear Power Plants, Final Report”

    Science.gov (United States)

    2013-11-29

    ... Testing at Nuclear Power Plants, Final Report'' AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... entitled: NUREG-1482, Revision 2, ``Guidelines for Inservice Testing at Nuclear Power Plants,'' and... Restraints (Snubbers) at Nuclear Power Plants.'' In the previous Revisions 0 and 1 of NUREG-1482, the NRC...

  8. Testing the predictive power of nuclear mass models

    International Nuclear Information System (INIS)

    Mendoza-Temis, J.; Morales, I.; Barea, J.; Frank, A.; Hirsch, J.G.; Vieyra, J.C. Lopez; Van Isacker, P.; Velazquez, V.

    2008-01-01

    A number of tests are introduced which probe the ability of nuclear mass models to extrapolate. Three models are analyzed in detail: the liquid drop model, the liquid drop model plus empirical shell corrections and the Duflo-Zuker mass formula. If predicted nuclei are close to the fitted ones, average errors in predicted and fitted masses are similar. However, the challenge of predicting nuclear masses in a region stabilized by shell effects (e.g., the lead region) is far more difficult. The Duflo-Zuker mass formula emerges as a powerful predictive tool

  9. Materials, manufacture and testing of pressurized components of high-power steam power plants

    International Nuclear Information System (INIS)

    Blind, D.; Foehl, J.; Issler, L.; Schellhammer, W.; Sturm, D.; Kussmaul, K.; Heinrich, D.; Meyer, H.J.; Prestel, W.

    1981-01-01

    This is the first German review of materials, production and testing of pressure components of high-capacity steam power plants. The authors have been working in this field for years; their special subject has been the availability and reliability of pressure vessels, in particular in nuclear engineering. Fundamentals are presented as well as the findings obtained at the state Materials Testing Institute in Stuttgart. The material is presented in a well-structured classification; the most recent international findings, especially of the USA, are presented. This is possible due to the close cooperation between the Stuttgart institute and a number of US research institutes. The new subject of fracture mechanics is treated in some detail; its fundamentals are discussed from the American point of view while German considerations - in particular of the Reactor Safety Commission - are taken into account in the field of applications. (orig.) [de

  10. W5″ Test: A simple method for measuring mean power output in the bench press exercise.

    Science.gov (United States)

    Tous-Fajardo, Julio; Moras, Gerard; Rodríguez-Jiménez, Sergio; Gonzalo-Skok, Oliver; Busquets, Albert; Mujika, Iñigo

    2016-11-01

    The aims of the present study were to assess the validity and reliability of a novel simple test [Five Seconds Power Test (W5″ Test)] for estimating the mean power output during the bench press exercise at different loads, and its sensitivity to detect training-induced changes. Thirty trained young men completed as many repetitions as possible in a time of ≈5 s at 25%, 45%, 65% and 85% of one-repetition maximum (1RM) in two test sessions separated by four days. The number of repetitions, linear displacement of the bar and time needed to complete the test were recorded by two independent testers, and a linear encoder was used as the criterion measure. For each load, the mean power output was calculated in the W5″ Test as mechanical work per time unit and compared with that obtained from the linear encoder. Subsequently, 20 additional subjects (10 training group vs. 10 control group) were assessed before and after completing a seven-week training programme designed to improve maximal power. Results showed that both assessment methods correlated highly in estimating mean power output at different loads (r range: 0.86-0.94; p bench press exercise in subjects who have previous resistance training experience.

  11. Improving power for rare-variant tests by integrating external controls.

    Science.gov (United States)

    Lee, Seunggeun; Kim, Sehee; Fuchsberger, Christian

    2017-11-01

    Due to the drop in sequencing cost, the number of sequenced genomes is increasing rapidly. To improve power of rare-variant tests, these sequenced samples could be used as external control samples in addition to control samples from the study itself. However, when using external controls, possible batch effects due to the use of different sequencing platforms or genotype calling pipelines can dramatically increase type I error rates. To address this, we propose novel summary statistics based single and gene- or region-based rare-variant tests that allow the integration of external controls while controlling for type I error. Our approach is based on the insight that batch effects on a given variant can be assessed by comparing odds ratio estimates using internal controls only vs. using combined control samples of internal and external controls. From simulation experiments and the analysis of data from age-related macular degeneration and type 2 diabetes studies, we demonstrate that our method can substantially improve power while controlling for type I error rate. © 2017 WILEY PERIODICALS, INC.

  12. Statistical Power in Plant Pathology Research.

    Science.gov (United States)

    Gent, David H; Esker, Paul D; Kriss, Alissa B

    2018-01-01

    In null hypothesis testing, failure to reject a null hypothesis may have two potential interpretations. One interpretation is that the treatments being evaluated do not have a significant effect, and a correct conclusion was reached in the analysis. Alternatively, a treatment effect may have existed but the conclusion of the study was that there was none. This is termed a Type II error, which is most likely to occur when studies lack sufficient statistical power to detect a treatment effect. In basic terms, the power of a study is the ability to identify a true effect through a statistical test. The power of a statistical test is 1 - (the probability of Type II errors), and depends on the size of treatment effect (termed the effect size), variance, sample size, and significance criterion (the probability of a Type I error, α). Low statistical power is prevalent in scientific literature in general, including plant pathology. However, power is rarely reported, creating uncertainty in the interpretation of nonsignificant results and potentially underestimating small, yet biologically significant relationships. The appropriate level of power for a study depends on the impact of Type I versus Type II errors and no single level of power is acceptable for all purposes. Nonetheless, by convention 0.8 is often considered an acceptable threshold and studies with power less than 0.5 generally should not be conducted if the results are to be conclusive. The emphasis on power analysis should be in the planning stages of an experiment. Commonly employed strategies to increase power include increasing sample sizes, selecting a less stringent threshold probability for Type I errors, increasing the hypothesized or detectable effect size, including as few treatment groups as possible, reducing measurement variability, and including relevant covariates in analyses. Power analysis will lead to more efficient use of resources and more precisely structured hypotheses, and may even

  13. The Prototype Fundamental Power Coupler For The Spallation Neutron Source Superconducting Cavities: Design And Initial Test Results

    International Nuclear Information System (INIS)

    K. M. Wilson; I. E. Campisi; E. F. Daly; G. K. Davis; M. Drury; J. E. Henry; P. Kneisel; G. Myneni; T. Powers; W. J. Schneider; M. Stirbet; Y. Kang; K. Cummings; T. Hardek

    2001-01-01

    Each of the 805 MHz superconducting cavities of the Spallation Neutron Source (SNS) is powered via a coaxial Fundamental Power Coupler (FPC) with a 50 Omega impedance and a warm planar alumina window. The design is derived from the experience of other laboratories; in particular, a number of details are based on the coupler developed for the KEK B-Factory superconducting cavities. However, other design features have been modified to account for the fact that the SNS FPC will transfer a considerably lower average power than the KEK-B coupler. Four prototypes have been manufactured so far, and preliminary tests performed on two of them at Los Alamos National Laboratory (LANL). During these tests, peak powers of over 500 kW were transferred through the couplers in the test stand designed and built for this purpose. This paper gives details of the coupler design and of the results obtained from the RF tests on the test stand during the last few months. A more comprehensive set of tests is planned for the near future

  14. PPARA intron polymorphism associated with power performance in 30-s anaerobic Wingate Test.

    Directory of Open Access Journals (Sweden)

    Miroslav Petr

    Full Text Available To date, polymorphisms in several genes have been associated with a strength/power performance including alpha 3 actinin, ciliary neurotrophic factor, vitamin D receptor, or angiotensin I converting enzyme, underlining the importance of genetic component of the multifactorial strength/power-related phenotypes. The single nucleotide variation in peroxisome proliferator-activated receptor alpha gene (PPARA intron 7 G/C (rs4253778; g.46630634G>C has been repeatedly found to play a significant role in response to different types of physical activity. We investigated the effect of PPARA intron 7 G/C polymorphism specifically on anaerobic power output in a group of 77 elite male Czech ice hockey players (18-36 y. We determined the relative peak power per body weight (Pmax.kg(-1 and relative peak power per fat free mass (W.kg(-1FFM during the 30-second Wingate Test (WT30 on bicycle ergometer (Monark 894E Peak bike, MONARK, Sweden. All WT30s were performed during the hockey season. Overall genotype frequencies were 50.6% GG homozygotes, 40.3% CG heterozygotes, and 9.1% CC homozygotes. We found statistically significant differences in Pmax.kg(-1 and marginally significant differences in Pmax.kg(-1FFM values in WT30 between carriers and non-carriers for C allele (14.6 ± 0.2 vs. 13.9 ± 0.3 W.kg(-1 and 15.8 ± 0.2 vs. 15.2 ± 0.3 W.kg(-1FFM, P = 0.036 and 0.12, respectively. Furthermore, Pmax.kg(-1FFM strongly positively correlated with the body weight only in individuals with GG genotypes (R = 0.55; p<0.001. Our results indicate that PPARA 7C carriers exhibited higher speed strength measures in WT30. We hypothesize that C allele carriers within the cohort of trained individuals may possess a metabolic advantage towards anaerobic metabolism.

  15. Power-Cooling-Mismatch Test Series. Test PCM-2: postirradiation examination

    International Nuclear Information System (INIS)

    Seiffert, S.L.

    1977-03-01

    The report describes the results of the postirradiation examination of four 0.91-m long pressurized water reactor (PWR) type, UO 2 -fueled zircaloy-clad fuel rods tested in an in-pile experimental investigation of pre- and post-departure from nucleate boiling (DNB) behavior of previously unirradiated fuel rods. None of the four fuel rods tested failed during testing or during reactor shut down. Visual and metallographic examination of the individual fuel rods indicated that the length of the high temperature zone of film boiling varied from rod to rod. Two of the four fuel rods showed evidence of damage by film boiling, characterized by oxide spalling and cladding collapse. Metallographic examination of these fuel rods showed internal cladding oxidation resulting from fuel-cladding reaction. Cladding embrittlement by oxidation is evaluated. A comparison of the cladding surface temperatures estimated metallographically for the separate fuel rods with cladding surface temperatures measured during testing and calculated from the Fuel Rod Analysis Program-Transient (FRAP-T) computer code is included

  16. Summary of in-situ tests of filter systems in nuclear power stations

    International Nuclear Information System (INIS)

    Hesboel, R.; Persson, M.

    1980-04-01

    Iodine filter installations at nuclear power plants are systematically tested regarding light assembly and retention of iodine. Studsvik Energiteknik AB has collected a sizeable amount of test data over the years. The filter installations and test methods are described, followed by an analysis of test results and experience over the past 10 years. As a rule in-situ tests have been carried out at low relative humidity, in 90% of them below 50% relative humidity. Variations in flow have been larger than expected, and the variations in operative conditions affect test results. The test method is, however, regarded acceptable for off-gas filter systems. Additional test methods are required for the auxiliary and energency systems. (G.B.)

  17. Design and RF test result of High Power Hybrid Combiner for Helicon Wave Current Drive in KSTAR Plasmas

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. Y.; Kim, H. J.; Wi, H. H.; Wang, S. J.; Kwak, J. G. [NFRI, Daejeon (Korea, Republic of)

    2016-05-15

    200 kW RF power will be injected to plasmas through the traveling wave antenna after combining four klystrons output powers using three hybrid combiners. Each klystron produces 60 kW output at the frequency of 500 MHz. RF power combiners commonly used to divide or combine output powers for various rf and microwave applications. It is divided into several types according to the design type such as Wilkinson combiner, radial and quadrature hybrid combiner. We designed high power hybrid combiners using 6-1/8 inch coaxial line. The power combiner has many advantages such as high isolation, low insertion loss and high power handling capability. In this paper design and rf test results of high power combiners will be described. High power combiners using three coaxial hybrid couplers will be utilized for effectively combining of 500 MHz, 200 kW output powers generated by four klystrons. We have designed, fabricated, and tested a 6-1/8 inch coaxial hybrid combiners at 500 MHz for efficiently off-axis Helicon wave current drive in KSTAR. Simulation and test results of high power coaxial hybrid combiners are good agreement.

  18. Seismic proving tests on the reliability for large components and equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Ohno, Tokue; Tanaka, Nagatoshi

    1988-01-01

    Since Japan has destructive earthquakes frequently, the structural reliability for large components and equipment of nuclear power plants are rigorously required. They are designed using sophisticated seismic analyses and have not yet encountered a destructive earthquake. When nuclear power plants are planned, it is very important that the general public understand the structural reliability during and after an earthquake. Seismic Proving Tests have been planned by Ministry of International Trade and Industry (Miti) to comply with public requirement in Japan. A large-scale high-performance vibration table was constructed at Tasted Engineering Laboratory of Nuclear Power Engineering Test Center (NU PEC), in order to prove the structural reliability by vibrating the test model (of full scale or close to the actual size) in the condition of a destructive earthquake. As for the test models, the following four items were selected out of large components and equipment important to the safety: Reactor Containment Vessel; Primary Coolant Loop or Primary Loop Recirculation System; Reactor Pressure Vessel; and Reactor Core Internals. Here is described a brief of the vibration table, the test method and the results of the tests on PWR Reactor Containment Vessel and BWR Primary Loop Recirculation System (author)

  19. Single-Event Latchup Testing of the Micrel MIC4424 Dual Power MOSFET Driver

    Science.gov (United States)

    Pellish, J. A.; Boutte, A.; Kim, H.; Phan, A.; Topper, A.

    2016-01-01

    We conducted 47 exposures of four different MIC4424 devices and did not observe any SEL or high-current events. This included worst-case conditions with a LET of 81 MeV-sq cm/mg, applied voltage of 18.5 V, a case temperature greater than 120 C, and a final fluence of 1x10(exp 7)/sq cm. We also monitored both the outputs for the presence of SETs. While the period of the 1 MHz square wave was slightly altered in some cases, no pulses were added or deleted. 1. Purpose: The purpose of this testing is to characterize the BiCMOS/DMOS Micrel MIC4424 dual, non-inverting MOSFET driver for single-event latchup (SEL) susceptibility. These data will be used for flight lot evaluation purposes. 2. Devices Tested: The MIC4423/4424/4425 family are highly reliable BiCMOS/DMOS buffer/driver MOSFET drivers. They are higher output current versions of the MIC4426/4427/4428. They can survive up to 5V of noise spiking, of either polarity, on the ground pin. They can accept, without either damage or logic upset, up to half an amp of reverse current (either polarity) forced back into their outputs. Primarily intended for driving power MOSFETs, the MIC4423/4424/4425 drivers are suitable for driving other loads (capacitive, resistive, or inductive) which require low-impedance, high peak currents, and fast switching times. Heavily loaded clock lines, coaxial cables, or piezoelectric transducers are some examples. The only known limitation on loading is that total power dissipated in the driver must be kept within the maximum power dissipation limits of the package. Five (5) parts were provided for SEL testing. We prepared four parts for irradiation and reserved one piece as an un-irradiated control. More information about the devices can be found in Table 1. The parts were prepared for testing by removing the lid from the CDIP package to expose the target die. The parts were then soldered to small copper circuit adapter boards for easy handling. These parts are fabricated in a bulk Bi

  20. Experimental Program for the CLIC test facility 3 test beam line

    CERN Document Server

    Adli, E; Dobert, S; Olvegaard, M; Schulte, D; Syratchev, I; Lillestol, Reidar

    2010-01-01

    The CLIC Test Facility 3 Test Beam Line is the first prototype for the CLIC drive beam decelerator. Stable transport of the drive beam under deceleration is a mandatory component in the CLIC two-beam scheme. In the Test Beam Line more than 50% of the total energy will be extracted from a 150 MeV, 28 A electron drive beam, by the use of 16 power extraction and transfer structures. A number of experiments are foreseen to investigate the drive beam characteristics under deceleration in the Test Beam Line, including beam stability, beam blow up and the efficiency of the power extraction. General benchmarking of decelerator simulation and theory studies will also be performed. Specially designed instrumentation including precision BPMs, loss monitors and a time-resolved spectrometer dump will be used for the experiments. This paper describes the experimental program foreseen for the Test Beam Line, including the relevance of the results for the CLIC decelerator studies.

  1. Powering tests before LHC warm-up, what is new from Chamonix 2011?

    International Nuclear Information System (INIS)

    Pojer, M.

    2012-01-01

    At the end of 2012, the Large Hadron Collider will enter its first programmed long stop (LS1). The problem at the origin of 2008 incident will be definitely treated and the main circuits will then be able to run at the design current value without protection issues. At Chamonix 2011, a proposal was done for a series of powering tests to be performed just before the LS1 to investigate other potential limitations in the machine, which could be fixed during the same maintenance period. A review of these powering tests is presented, together with the list of investigation to be performed by the electrical quality assurance (ElQA) team. A tentative planning is as well proposed. Moreover, following complementary activities during the LS1, a huge campaign of individual system tests will have to be as well performed during the shutdown. Attention will be put on the preliminary list of needed re-qualifications. (author)

  2. Estimation of sample size and testing power (part 6).

    Science.gov (United States)

    Hu, Liang-ping; Bao, Xiao-lei; Guan, Xue; Zhou, Shi-guo

    2012-03-01

    The design of one factor with k levels (k ≥ 3) refers to the research that only involves one experimental factor with k levels (k ≥ 3), and there is no arrangement for other important non-experimental factors. This paper introduces the estimation of sample size and testing power for quantitative data and qualitative data having a binary response variable with the design of one factor with k levels (k ≥ 3).

  3. Results of Low Power Deicer tests on a swept inlet component in the NASA Lewis Icing Research Tunnel

    Science.gov (United States)

    Bond, Thomas H.; Shin, Jaiwon

    1993-01-01

    Tests were conducted under a USAF/NASA Low Power Deicer program on two expulsive technologies to examine system performance on hardware representative of a modern aircraft part. The BF Goodrich Electro-Expulsive Deicing System and Pneumatic Impulse Ice Protection system were installed on a swept, compound curve, engine inlet component with varying leading edge radius, and tested through a range of icing and system operating conditions in the NASA Lewis Icing Research Tunnel. A description of the experimental procedure and results, including residual ice thickness, shed ice particle size, and changes in system energy/pressure characteristics are presented.

  4. A novel synthetic test system for thyristor level in the converter valve of HVDC power transmission

    Directory of Open Access Journals (Sweden)

    Liu Longchen

    2016-01-01

    Full Text Available The converter valve is the core equipment in the HVDC power transmission system, a+-nd its performance has a direct effect on the reliability, stability and efficiency of the whole power system. As the basic unit of HVDC converter valve, the thyristor level needs to be test routinely in order to grasp the state of the converter valve equipment. Therefore, it is urgent to develop a novel synthetic test system for the thyristor level with thyristor control unit (TCU. However, currently there is no specific test scheme for the thyristor level of HVDC converter valve. In this paper, the synthetic test principle, content and methods for the thyristor level with TCU are presented based on the analysis of the thyristor reverse recovery characteristic and the IEC technology standard. And a transient high-voltage pulse is applied to the thyristor level during its reverse recovery period in order to test the characteristics of thyristor level. Then, the synthetic test system for the thyristor level is applied to the converter valve test of ±800 kV HVDC power transmission project, and the practical test result verifies the reasonability and validity of the proposed synthetic test system.

  5. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  6. Why Panel Tests of Purchasing Power Parity Should Allow for Heterogeneous Mean Reversion

    NARCIS (Netherlands)

    C.G. Koedijk (Kees); B. Tims (Ben); M.A. van Dijk (Mathijs)

    2010-01-01

    textabstractAbstract Recent studies of purchasing power parity (PPP) use panel tests that fail to take into account heterogeneity in the speed of mean reversion across real exchange rates. In contrast to several other severe restrictions of panel models and tests of PPP, the assumption of

  7. Evaluation of football players’ power during a maturation period by use the RAST test

    Directory of Open Access Journals (Sweden)

    Adrian Sieroń

    2017-07-01

    Full Text Available Abstract          Introduction: Properly planned and implemented training cycle should influence the development      of motor skills, responsible for anaerobic work. The ability to quickly achieve and maintain high power is crucial to the final success of football (Stankiewicz               i Cieślicka, 2013. Performing     a specific test several Times, during preparation for the league games, gives the coaches and instructors of the sport the ability to dispense appropriate training loads, before the start and during the game. Moreover, they can freely watching the progress of the pupil. An athlete who, under intense effort, will reach high speeds with a low power loss, will achieve a high level of tolerance to fatigue. The ability to rapidly speed up and to multiple repetition of this activity, is now the basic requirement of most sports, such as football, basketball, handball, athletics, tennis and more.          The aim of the study is to assess the power of football players of different ages with the RAST test. In addition, relative power will be tested with reference to the body weight of the subjects.         Conclusion: By analyzing the study population, it can be concluded that body mass is significantly dominant in the group of high school students, which undoubtedly influences their ability to gain more power. Furthermore, taking into account the results of the relativized power, it has to be stated, that after weight loss relative power is also significantly dominant in high school students, which is evidence for their more advanced biological development and the impact of football training on the obtained results.

  8. Design, construction and testing of a self-powered neutron detector

    International Nuclear Information System (INIS)

    Correa, R.F.

    1987-01-01

    The design, construction and testing of a self-powered neutron detector (SPN) and associated electronics are described. Several tests were performed giving information about dielectrical properties of detector and cable, gamma spectra induced in the detector through reactor irradiation, detector response as a function of neutron flux, current stability and reproductibility with the neutron flux. The gamma and neutron sensitivities were also evaluated, by means of thermoluminescent dosimeters and gold foils as references. The test results are presented and show that the detector response is reliable. The gamma and neutron sensitivities are in agreement with those found in the available literature. Nevertheless, a ceramic insulated cable should be employed for permanent use in a reactor. The tests were performed in a 100 KW TRIGA Mark I reactor at the Centro de Desenvolvimento da Tecnologia Nuclear of NUCLEBRAS, in Belo Horizonte, Brazil. (author) [pt

  9. The Role of Visual Feedback on Power Output During Intermittent Wingate Testing in Ice Hockey Players

    Directory of Open Access Journals (Sweden)

    Petr Stastny

    2018-04-01

    Full Text Available Background: Visual feedback may help elicit peak performance during different types of strength and power testing, but its effect during the anaerobic Wingate test is unexplored. Therefore, the purpose of this study was to determine the effect of visual feedback on power output during a hockey-specific intermittent Wingate test (AnWT6x6 consisting of 6 stages of 6 s intervals with a 1:1 work-to-rest ratio. Methods: Thirty elite college-aged hockey players performed the AnWT6x6 with either constant (n = 15 visual feedback during all 6 stages (CVF or restricted (n = 15 visual feedback (RVF where feedback was shown only during the 2nd through 5th stages. Results: In the first stage, there were moderate-to-large effect sizes for absolute peak power (PP output and PP relative to body mass and PP relative to fat-free mass. However, the remaining stages (2–6 displayed small or negligible effects. Conclusions: These data indicate that visual feedback may play a role in optimizing power output in a non-fatigued state (1st stage, but likely does not play a role in the presence of extreme neuromuscular fatigue (6th stage during Wingate testing. To achieve the highest peak power, coaches and researchers could provide visual feedback during Wingate testing, as it may positively influence performance in the early stages of testing, but does not result in residual fatigue or negatively affect performance during subsequent stages.

  10. Clinical tests of ankle plantarflexor strength do not predict ankle power generation during walking.

    Science.gov (United States)

    Kahn, Michelle; Williams, Gavin

    2015-02-01

    The aim of this study was to investigate the relationship between a clinical test of ankle plantarflexor strength and ankle power generation (APG) at push-off during walking. This is a prospective cross-sectional study of 102 patients with traumatic brain injury. Handheld dynamometry was used to measure ankle plantarflexor strength. Three-dimensional gait analysis was performed to quantify ankle power generation at push-off during walking. Ankle plantarflexor strength was only moderately correlated with ankle power generation at push-off (r = 0.43, P < 0.001; 95% confidence interval, 0.26-0.58). There was also a moderate correlation between ankle plantarflexor strength and self-selected walking velocity (r = 0.32, P = 0.002; 95% confidence interval, 0.13-0.48). Handheld dynamometry measures of ankle plantarflexor strength are only moderately correlated with ankle power generation during walking. This clinical test of ankle plantarflexor strength is a poor predictor of calf muscle function during gait in people with traumatic brain injury.

  11. Enhancing reliability of ultrasonic testing of welds of nuclear power plant equipment

    International Nuclear Information System (INIS)

    Shcherbinskij, V.G.

    1981-01-01

    Results of investigation of factors influencing the reliability of manual ultrasonic testing of welded joints and weld deposited metal power-generating equipment are presented. Recommendations on the enhancing of reliability are given [ru

  12. Innovative Approaches to Development and Ground Testing of Advanced Bimodal Space Power and Propulsion Systems

    International Nuclear Information System (INIS)

    Hill, T.; Noble, C.; Martinell, J.; Borowski, S.

    2000-01-01

    The last major development effort for nuclear power and propulsion systems ended in 1993. Currently, there is not an initiative at either the National Aeronautical and Space Administration (NASA) or the U.S. Department of Energy (DOE) that requires the development of new nuclear power and propulsion systems. Studies continue to show nuclear technology as a strong technical candidate to lead the way toward human exploration of adjacent planets or provide power for deep space missions, particularly a 15,000 lbf bimodal nuclear system with 115 kW power capability. The development of nuclear technology for space applications would require technology development in some areas and a major flight qualification program. The last major ground test facility considered for nuclear propulsion qualification was the U.S. Air Force/DOE Space Nuclear Thermal Propulsion Project. Seven years have passed since that effort, and the questions remain the same, how to qualify nuclear power and propulsion systems for future space flight. It can be reasonably assumed that much of the nuclear testing required to qualify a nuclear system for space application will be performed at DOE facilities as demonstrated by the Nuclear Rocket Engine Reactor Experiment (NERVA) and Space Nuclear Thermal Propulsion (SNTP) programs. The nuclear infrastructure to support testing in this country is aging and getting smaller, though facilities still exist to support many of the technology development needs. By renewing efforts, an innovative approach to qualifying these systems through the use of existing facilities either in the U.S. (DOE's Advance Test Reactor, High Flux Irradiation Facility and the Contained Test Facility) or overseas should be possible

  13. Innovation Approaches to Development and Ground Testing of Advanced Bimodal Space Power and Propulsion Systems

    Energy Technology Data Exchange (ETDEWEB)

    Hill, T.; Noble, C.; Martinell, J. (INEEL); Borowski, S. (NASA Glenn Research Center)

    2000-07-14

    The last major development effort for nuclear power and propulsion systems ended in 1993. Currently, there is not an initiative at either the National Aeronautical and Space Administration (NASA) or the U.S. Department of Energy (DOE) that requires the development of new nuclear power and propulsion systems. Studies continue to show nuclear technology as a strong technical candidate to lead the way toward human exploration of adjacent planets or provide power for deep space missions, particularly a 15,000 lbf bimodal nuclear system with 115 kW power capability. The development of nuclear technology for space applications would require technology development in some areas and a major flight qualification program. The last major ground test facility considered for nuclear propulsion qualification was the U.S. Air Force/DOE Space Nuclear Thermal Propulsion Project. Seven years have passed since that effort, and the questions remain the same, how to qualify nuclear power and propulsion systems for future space flight. It can be reasonably assumed that much of the nuclear testing required to qualify a nuclear system for space application will be performed at DOE facilities as demonstrated by the Nuclear Rocket Engine Reactor Experiment (NERVA) and Space Nuclear Thermal Propulsion (SNTP) programs. The nuclear infrastructure to support testing in this country is aging and getting smaller, though facilities still exist to support many of the technology development needs. By renewing efforts, an innovative approach to qualifying these systems through the use of existing facilities either in the U.S. (DOE's Advance Test Reactor, High Flux Irradiation Facility and the Contained Test Facility) or overseas should be possible.

  14. Innovative Approaches to Development and Ground Testing of Advanced Bimodal Space Power and Propulsion Systems

    Energy Technology Data Exchange (ETDEWEB)

    Hill, Thomas Johnathan; Noble, Cheryl Ann; Noble, C.; Martinell, John Stephen; Borowski, S.

    2000-07-01

    The last major development effort for nuclear power and propulsion systems ended in 1993. Currently, there is not an initiative at either the National Aeronautical and Space Administration (NASA) or the U.S. Department of Energy (DOE) that requires the development of new nuclear power and propulsion systems. Studies continue to show nuclear technology as a strong technical candidate to lead the way toward human exploration of adjacent planets or provide power for deep space missions, particularly a 15,000 lbf bimodal nuclear system with 115 kW power capability. The development of nuclear technology for space applications would require technology development in some areas and a major flight qualification program. The last major ground test facility considered for nuclear propulsion qualification was the U.S. Air Force/DOE Space Nuclear Thermal Propulsion Project. Seven years have passed since that effort, and the questions remain the same, how to qualify nuclear power and propulsion systems for future space flight. It can be reasonable assumed that much of the nuclear testing required to qualify a nuclear system for space application will be performed at DOE facilities as demonstrated by the Nuclear Rocket Engine Reactor Experiment (NERVA) and Space Nuclear Thermal Propulsion (SNTP) programs. The nuclear infrastructure to support testing in this country is aging and getting smaller, though facilities still exist to support many of the technology development needs. By renewing efforts, an innovative approach to qualifying these systems through the use of existing facilities either in the U.S. (DOE's Advance Test Reactor, High Flux Irradiation Facility and the Contained Test Facility) or overseas should be possible.

  15. Pressure test behaviour of embalse nuclear power plant containment structure

    International Nuclear Information System (INIS)

    Bruschi, S.; Marinelli, C.

    1984-01-01

    It's described the structural behaviour of the containment structure during the pressure test of the Embalse plant (CANDU type, 600MW), made of prestressed concrete with an epoxi liner. Displacement, strain, temperature, and pressure measurements of the containment structure of the Embalse Nuclear Power Plant are presented. The instrumentation set up and measurement specifications are described for all variables of interest before, during and after the pressure test. The analytical models to simulate the heat transfer due to sun heating and air convenction and to predict the associated thermal strains and displacements are presented. (E.G.) [pt

  16. Greater power and computational efficiency for kernel-based association testing of sets of genetic variants.

    Science.gov (United States)

    Lippert, Christoph; Xiang, Jing; Horta, Danilo; Widmer, Christian; Kadie, Carl; Heckerman, David; Listgarten, Jennifer

    2014-11-15

    Set-based variance component tests have been identified as a way to increase power in association studies by aggregating weak individual effects. However, the choice of test statistic has been largely ignored even though it may play an important role in obtaining optimal power. We compared a standard statistical test-a score test-with a recently developed likelihood ratio (LR) test. Further, when correction for hidden structure is needed, or gene-gene interactions are sought, state-of-the art algorithms for both the score and LR tests can be computationally impractical. Thus we develop new computationally efficient methods. After reviewing theoretical differences in performance between the score and LR tests, we find empirically on real data that the LR test generally has more power. In particular, on 15 of 17 real datasets, the LR test yielded at least as many associations as the score test-up to 23 more associations-whereas the score test yielded at most one more association than the LR test in the two remaining datasets. On synthetic data, we find that the LR test yielded up to 12% more associations, consistent with our results on real data, but also observe a regime of extremely small signal where the score test yielded up to 25% more associations than the LR test, consistent with theory. Finally, our computational speedups now enable (i) efficient LR testing when the background kernel is full rank, and (ii) efficient score testing when the background kernel changes with each test, as for gene-gene interaction tests. The latter yielded a factor of 2000 speedup on a cohort of size 13 500. Software available at http://research.microsoft.com/en-us/um/redmond/projects/MSCompBio/Fastlmm/. heckerma@microsoft.com Supplementary data are available at Bioinformatics online. © The Author 2014. Published by Oxford University Press.

  17. A portable power system using PEM fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    Long, E. [Ball Aerospace and Technologies Corp., Boulder, CO (United States)

    1997-12-31

    Ball has developed a proof-of-concept, small, lightweight, portable power system. The power system uses a proton exchange membrane (PEM) fuel cell stack, stored hydrogen, and atmospheric oxygen as the oxidant to generate electrical power. Electronics monitor the system performance to control cooling air and oxidant flow, and automatically do corrective measures to maintain performance. With the controller monitoring the system health, the system can operate in an ambient environment from 0 C to +50 C. The paper describes system testing, including load testing, thermal and humidity testing, vibration and shock testing, field testing, destructive testing of high-pressure gas tanks, and test results on the fuel cell power system, metal hydride hydrogen storage, high-pressure hydrogen gas storage, and chemical hydride hydrogen storage.

  18. Optimal testing input sets for reduced diagnosis time of nuclear power plant digital electronic circuits

    International Nuclear Information System (INIS)

    Kim, D.S.; Seong, P.H.

    1994-01-01

    This paper describes the optimal testing input sets required for the fault diagnosis of the nuclear power plant digital electronic circuits. With the complicated systems such as very large scale integration (VLSI), nuclear power plant (NPP), and aircraft, testing is the major factor of the maintenance of the system. Particularly, diagnosis time grows quickly with the complexity of the component. In this research, for reduce diagnosis time the authors derived the optimal testing sets that are the minimal testing sets required for detecting the failure and for locating of the failed component. For reduced diagnosis time, the technique presented by Hayes fits best for the approach to testing sets generation among many conventional methods. However, this method has the following disadvantages: (a) it considers only the simple network (b) it concerns only whether the system is in failed state or not and does not provide the way to locate the failed component. Therefore the authors have derived the optimal testing input sets that resolve these problems by Hayes while preserving its advantages. When they applied the optimal testing sets to the automatic fault diagnosis system (AFDS) which incorporates the advanced fault diagnosis method of artificial intelligence technique, they found that the fault diagnosis using the optimal testing sets makes testing the digital electronic circuits much faster than that using exhaustive testing input sets; when they applied them to test the Universal (UV) Card which is a nuclear power plant digital input/output solid state protection system card, they reduced the testing time up to about 100 times

  19. Nuclear waste glass melter design including the power and control systems

    International Nuclear Information System (INIS)

    Chapman, C.C.

    1982-01-01

    An energy balance of a joule-heated nuclear waste glass melter is used to discuss the problems in the design of the melter geometry and in the specifications of the power and control systems. The relationships between geometry, electrode current density, production rate, load voltage, and load power are presented graphically. The influence of liquid feeding on the surface of the glass and the variability of nuclear waste glass on the design and control during operation is discussed. 10 refs

  20. A Comparison between Bench Press Throw and Ballistic Push-Up tests to assess upper-body power in trained individuals.

    Science.gov (United States)

    Bartolomei, Sandro; Nigro, Federico; Ruggeri, Sandro; Lanzoni, Ivan Malagoli; Ciacci, Simone; Merni, Franco; Sadres, Eliahu; Hoffman, Jay R; Semprini, Gabriele

    2018-03-06

    The purpose of the present study was to validate the ballistic push-up test performed with hands on a force plate (BPU) as a method to measure upper-body power. Twenty-eight experienced resistance trained men (age = 25.4 ± 5.2 y; body mass = 78.5 ± 9.0 kg; body height = 179.6 ± 7.8 cm) performed, two days apart, a bench press 1RM test and upper-body power tests. Mean power and peak power were assessed using the bench press throw test (BT) and the BPU test performed in randomized order. The area under the force/power curve (AUC) obtained at BT was also calculated. Power expressed at BPU was estimated using a time-based prediction equation. Mean force and the participant's body weight were used to predict the bench press 1RM. Pearson product moment correlations were used to examine relationships between the power assessment methods and between the predicted 1RM bench and the actual value. Large correlations (0.79; p bench and the 1RM predicted by the BPU. Results of the present study indicate that BPU represents a valid and reliable method to estimate the upper-body power in resistance-trained individuals.

  1. Simulation of power maneuvering experiment of MASLWR test facility by MARS-KS code

    Energy Technology Data Exchange (ETDEWEB)

    Park, Ju Yeop [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-10-15

    In the present study, KINS simulation result by the MARS-KS code (KS-002 version) for the SP-3 experiment is presented in detail and conclusion on MARS-KS code performance drawn through this simulation is described. Performance of the MARS-KS code is evaluated through the simulation of the power maneuvering experiment of the MASLWR test facility. Steady run shows the helical coil specific heat transfer model of the code is reasonable. However, identified discrepancy of the primary mass flowrate at transient run shows code performance for pressure drop needs to be improved considering sensitivity of the flowrate to the pressure drop at natural circulation. Since 2009, IAEA has conducted a research program entitled as ICSP (International Collaborative Standard Problem) on integral PWR design to evaluate current the state of the art of thermal-hydraulic code in simulating natural circulation flow within integral type reactor. In this ICSP, experimental data obtained from MASLWR (Multi-Application Small Light Water Reactor) test facility located at Oregon state university in the US have been simulated by various thermal-hydraulic codes of each participant of the ICSP and compared among others. MASLWR test facility is a mock-up of a passive integral type reactor equipped with helical coil steam generator. Since SMART reactor which is currently being developed in Korea also adopts a helical coil steam generator, Korea Institute of Nuclear Safety (KINS) has joined this ICSP to assess the applicability of a domestic regulatory audit thermal-hydraulic code (i. e. MARS-KS code) for the SMART reactor including wall-to-fluid heat transfer model modification based on independent international experiment data. In the ICSP, two types of transient experiments have been focused and they are loss of feedwater transient with subsequent ADS operation and long term cooling (SP-2) and normal operating conditions at different power levels (SP-3)

  2. A more powerful test based on ratio distribution for retention noninferiority hypothesis.

    Science.gov (United States)

    Deng, Ling; Chen, Gang

    2013-03-11

    Rothmann et al. ( 2003 ) proposed a method for the statistical inference of fraction retention noninferiority (NI) hypothesis. A fraction retention hypothesis is defined as a ratio of the new treatment effect verse the control effect in the context of a time to event endpoint. One of the major concerns using this method in the design of an NI trial is that with a limited sample size, the power of the study is usually very low. This makes an NI trial not applicable particularly when using time to event endpoint. To improve power, Wang et al. ( 2006 ) proposed a ratio test based on asymptotic normality theory. Under a strong assumption (equal variance of the NI test statistic under null and alternative hypotheses), the sample size using Wang's test was much smaller than that using Rothmann's test. However, in practice, the assumption of equal variance is generally questionable for an NI trial design. This assumption is removed in the ratio test proposed in this article, which is derived directly from a Cauchy-like ratio distribution. In addition, using this method, the fundamental assumption used in Rothmann's test, that the observed control effect is always positive, that is, the observed hazard ratio for placebo over the control is greater than 1, is no longer necessary. Without assuming equal variance under null and alternative hypotheses, the sample size required for an NI trial can be significantly reduced if using the proposed ratio test for a fraction retention NI hypothesis.

  3. Wind Turbine Generator System Power Performance Test Report for the ARE442 Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    van Dam, J.; Jager, D.

    2010-02-01

    This report summarizes the results of a power performance test that NREL conducted on the ARE 442 wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the ARE 442 is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

  4. Improving the AGR fuel testing power density profile versus irradiation-time in the advanced test reactor

    International Nuclear Information System (INIS)

    Chang, Gray S.; Lillo, Misti A.; Maki, John T.; Petti, David A.

    2009-01-01

    The Very High Temperature gas-cooled Reactor (VHTR), which is currently being developed, achieves simplification of safety through reliance on ceramic-coated fuel particles. Each TRISO-coated fuel particle has its own containment which serves as the principal barrier against radionuclide release under normal operating and accident conditions. These fuel particles, in the form of graphite fuel compacts, are currently undergoing a series of irradiation tests in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) to support the Advanced Gas-Cooled Reactor (AGR) fuel qualification program. A representive coated fuel particle with an 235 U enrichment of 19.8 wt% was used in this analysis. The fuel burnup analysis tool used to perform the neutronics study reported herein, couples the Monte Carlo transport code MCNP, with the radioactive decay and burnup code ORIGEN2. The fuel burnup methodology known as Monte-Carlo with ORIGEN2 (MCWO) was used to evaluate the AGR experiment assembly and demonstrate compliance with ATR safety requirements. For the AGR graphite fuel compacts, the MCWO-calculated fission power density (FPD) due to neutron fission in 235 U is an important design parameter. One of the more important AGR fuel testing requirements is to maintain the peak fuel compact temperature close to 1250degC throughout the proposed irradiation campaign of 550 effective full power days (EFPDs). Based on the MCWO-calculated FPD, a fixed gas gap size was designed to allow regulation of the fuel compact temperatures throughout the entire fuel irradiation campaign by filling the gap with a mixture of helium and neon gases. The chosen fixed gas gap can only regulate the peak fuel compact temperature in the desired range during the irradiation test if the ratio of the peak power density to the time-dependent low power density (P/T) at 550 EFPDs is less than 2.5. However, given the near constant neutron flux within the ATR driver core and the depletion of 235 U

  5. Complete Loss and Thermal Model of Power Semiconductors Including Device Rating Information

    DEFF Research Database (Denmark)

    Ma, Ke; Bahman, Amir Sajjad; Beczkowski, Szymon

    2015-01-01

    Thermal loading of power devices are closely related to the reliability performance of the whole converter system. The electrical loading and device rating are both important factors that determine the loss and thermal behaviors of power semiconductor devices. In the existing loss and thermal...

  6. Validity and reliability of the single-trial line drill test of anaerobic power in basketball players.

    Science.gov (United States)

    Fatouros, I G; Laparidis, K; Kambas, A; Chatzinikolaou, A; Techlikidou, E; Katrabasas, I; Douroudos, I; Leontsini, D; Berberidou, F; Draganidis, D; Christoforidis, C; Tsoukas, D; Kelis, S; Taxildaris, K

    2011-03-01

    This study evaluated the validity, reliability, and sensitivity of the single-trial line drill test (SLDT) for anaerobic power assessment. Twenty-four volunteers were assigned to either a control (C, N.=12) or an experimental (BP, N.=12 basketball players) group. SLDT's (time-to-complete) concurrent validity was evaluated against the Wingate testing (WAnT: mean [MP] and peak power [PP]) and a 30-sec vertical jump testing test (VJT: mean height and MP). Blood lactate concentration was measured at rest and immediately post-test. SLDT's reliability [test-retest intraclass correlation coefficients (ICC), coefficient of variation (CV), Bland-Altman plots] and sensitivity were determined (one-way ANOVA). Kendall's tau correlation analysis revealed correlations (Pbasketball players.

  7. Design and preliminary test results of the 40 MW power supply at the National High Magnetic Field Laboratory

    International Nuclear Information System (INIS)

    Boenig, H.J.; Bogdan, F.; Morris, G.C.; Ferner, J.A.; Schneider-Muntau, H.J.; Rumrill, R.H.; Rumrill, R.S.

    1993-01-01

    Four highly stabilized, steady-state, 10 MW power supplies have been installed at the National High Magnetic Field Laboratory in Tallahassee, FL. Each supply consists of a 12.5 kV vacuum circuit breaker, two three-winding, step-down transformers, a 24-pulse rectifier with interphase reactors and freewheeling diodes, and a passive and an active filter. Two different transformer tap settings allow dc supply output voltages of 400 and 500 V. The rated current of a supply is 17 kA and each supply has a one hour overload capability of 20 kA. The power supply output bus system, including a reversing switch at the input and 2 x 16 disconnect switches at the output, connects each supply to 16 different magnet cells. The design of the power supply is described and preliminary test results with a supply feeding a 10 MW resistive load are presented

  8. Power generation scheduling. A free market based procedure with reserve constraints included

    International Nuclear Information System (INIS)

    Huse, Einar Staale

    1998-01-01

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs

  9. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1999-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  10. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1998-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  11. A New Framework for Reactive Power Market Considering Power System Security

    Directory of Open Access Journals (Sweden)

    A. Rabiee

    2009-09-01

    Full Text Available This paper presents a new framework for the day-ahead reactive power market based on the uniform auction price. Voltage stability and security have been considered in the proposed framework. Total Payment Function (TPF is suggested as the objective function of the Optimal Power Flow (OPF used to clear the reactive power market. Overload, voltage drop and voltage stability margin (VSM are included in the constraints of the OPF. Another advantage of the proposed method is the exclusion of Lost Opportunity Cost (LOC concerns from the reactive power market. The effectiveness of the proposed reactive power market is studied based on the CIGRÉ-32 bus test system.

  12. Validation of Lifetime Prediction of IGBT Modules Based on Linear Damage Accumulation by Means of Superimposed Power Cycling Tests

    DEFF Research Database (Denmark)

    Choi, Ui-Min; Ma, Ke; Blaabjerg, Frede

    2018-01-01

    In this paper, the lifetime prediction of power device modules based on the linear damage accumulation is studied in conjunction with simple mission profiles of converters. Superimposed power cycling conditions, which are called simple mission profiles in this paper, are made based on a lifetime ...... prediction of IGBT modules under power converter applications.......In this paper, the lifetime prediction of power device modules based on the linear damage accumulation is studied in conjunction with simple mission profiles of converters. Superimposed power cycling conditions, which are called simple mission profiles in this paper, are made based on a lifetime...... model in respect to junction temperature swing duration. This model has been built based on 39 power cycling test results of 600-V 30-A three-phase-molded IGBT modules. Six tests are performed under three superimposed power cycling conditions using an advanced power cycling test setup. The experimental...

  13. Power and Sample Size Calculations for Logistic Regression Tests for Differential Item Functioning

    Science.gov (United States)

    Li, Zhushan

    2014-01-01

    Logistic regression is a popular method for detecting uniform and nonuniform differential item functioning (DIF) effects. Theoretical formulas for the power and sample size calculations are derived for likelihood ratio tests and Wald tests based on the asymptotic distribution of the maximum likelihood estimators for the logistic regression model.…

  14. Testing of the Engineering Model Electrical Power Control Unit for the Fluids and Combustion Facility

    Science.gov (United States)

    Kimnach, Greg L.; Lebron, Ramon C.; Fox, David A.

    1999-01-01

    The John H. Glenn Research Center at Lewis Field (GRC) in Cleveland, OH and the Sundstrand Corporation in Rockford, IL have designed and developed an Engineering Model (EM) Electrical Power Control Unit (EPCU) for the Fluids Combustion Facility, (FCF) experiments to be flown on the International Space Station (ISS). The EPCU will be used as the power interface to the ISS power distribution system for the FCF's space experiments'test and telemetry hardware. Furthermore. it is proposed to be the common power interface for all experiments. The EPCU is a three kilowatt 12OVdc-to-28Vdc converter utilizing three independent Power Converter Units (PCUs), each rated at 1kWe (36Adc @ 28Vdc) which are paralleled and synchronized. Each converter may be fed from one of two ISS power channels. The 28Vdc loads are connected to the EPCU output via 48 solid-state and current-limiting switches, rated at 4Adc each. These switches may be paralleled to supply any given load up to the 108Adc normal operational limit of the paralleled converters. The EPCU was designed in this manner to maximize allocated-power utilization. to shed loads autonomously, to provide fault tolerance. and to provide a flexible power converter and control module to meet various ISS load demands. Tests of the EPCU in the Power Systems Facility testbed at GRC reveal that the overall converted-power efficiency, is approximately 89% with a nominal-input voltage of 12OVdc and a total load in the range of 4O% to 110% rated 28Vdc load. (The PCUs alone have an efficiency of approximately 94.5%). Furthermore, the EM unit passed all flight-qualification level (and beyond) vibration tests, passed ISS EMI (conducted, radiated. and susceptibility) requirements. successfully operated for extended periods in a thermal/vacuum chamber, was integrated with a proto-flight experiment and passed all stability and functional requirements.

  15. Use of Reactor Pressure Vessel Surveillance Materials for Extended Life Evaluations Using Power and Test Reactor Irradiations

    International Nuclear Information System (INIS)

    Server, W.L.; Nanstad, R.K.; Odette, G.R.

    2012-01-01

    The most important component in assuring safety of the nuclear power plant is the reactor pressure (RPV). Surveillance programs have been designed to cover the licensed life of operating nuclear RPVs. The original surveillance programs were designed when the licensed life was 40 years. More than one-half of the operating nuclear plants in the USA have an extended license out to 60 years, and there are plans to continue to operate many plants out to 80 years. Therefore, the surveillance programs have had to be adjusted or enhanced to generate key data for 60 years, and now consideration must be given for 80 or more years. To generate the necessary data to assure safe operation out to these extended license lives, test reactor irradiations have been initiated with key RPV and model alloy steels, which include several steels irradiated in the current power reactor surveillance programs out to relatively high fluence levels. These data are crucial in understanding the radiation embrittlement mechanisms and to enable extrapolation of the irradiation effects on mechanical properties for these extended time periods. This paper describes the potential radiation embrittlement mechanisms and effects when assessing much longer operating times and higher neutron fluence levels. Potential methods for adjusting higher neutron flux test reactor data for use in predicting power reactor vessel conditions are discussed. (author)

  16. Why nuclear power failed the market test in the UK

    International Nuclear Information System (INIS)

    Chesshire, J.

    1992-01-01

    The Conservative Party's manifesto for the general election of May 1987 contained two pledges of relevance to the UK electricity supply industry (ESI). These were to privatize the industry; and to continue to support the development of civil nuclear power in the private sector. As anticipated by some independent commentators, in the event these objectives proved incompatible. The costs of nuclear power have long been a vexed issue and UK nuclear costs have been higher than those in many other countries. While most of the UK ESI has now been privatized, nuclear generation remains in the public sector. This article seeks to explore the reasons for this fundamental and politically embarrassing policy reversal, a rarity under three successive Conservative administrations since 1979. It would be incorrect to argue that private ownership and nuclear power are inherently incompatible. Rather the specific - competitive - form of privatization proposed for the UK failed to provide sufficient guarantees for the London capital market. Thus, at least in this specific case, nuclear power failed the market test. The implications of this for the UK nuclear industry have been profound. As a result, the UK case has wider international lessons as the pressures for privatization, liberalization and greater cost transparency bear down upon electric utilities in other countries. (author)

  17. Design constrution and testing of a self-powered neutron detector

    International Nuclear Information System (INIS)

    Correa, R.F.

    1987-01-01

    The design, contruction and testing of a self-powered neutron detector (SPN) and associated electronics are described. Several tests were performed giving information about dielectrical properties od detector and cable, gamma spectra induced in the detector through reactor irradiation, detector response as a function of neutron flux, current stability and reproductibility with the neutron flux. The gamma and neutron sensitivities were also evaluated, by means of thermoluminescent dosimeters and gold foils as references. The test results are presented and show that the detector response is reliable. The gamma and neutron sensitivities are in agreement with those found in the available literature. Neverthe less, a ceramic insulated cable should be employed for permanent use in a reactor. The tests were perfomance in a 100 kW TRIGA Mark I reactor at the Centro de Desenvolvimento da Tecnologia Nuclear of NUCLEBRAS,in Belo Horizonte, Brazil. (Author) [pt

  18. Design development and testing of high voltage power supply with crowbar protection for IOT based RF amplifier system in VECC

    Science.gov (United States)

    Thakur, S. K.; Kumar, Y.

    2018-05-01

    This paper described the detailed design, development and testing of high voltage power supply (‑30 kV, 3.2 A) and different power supplies for biasing electrodes of Inductive Output Tube (IOT) based high power Radio Frequency (RF) amplifier. This IOT based RF amplifier is further used for pursuing research and development activity in superconducting RF cavity project at Variable Energy Cyclotron Centre (VECC) Kolkata. The state-of-the-art technology of IOT-based high power RF amplifier is designed, developed, and tested at VECC which is the first of its kind in India. A high voltage power supply rated at negative polarity of 30 kV dc/3.2 A is required for biasing cathode of IOT with crowbar protection circuit. This power supply along with crowbar protection system is designed, developed and tested at VECC for testing the complete setup. The technical difficulties and challenges occured during the design of cathode power supply, its crowbar protection techniques along with other supported power supplies i.e. grid and ion pump power supplies are discussed in this paper.

  19. Sea testing and optimisation of power production on a scale 1:4.5 test rig of the offshore wave energy converter wave dragon. Summary of final technical report

    Energy Technology Data Exchange (ETDEWEB)

    2006-06-15

    The 4-11 MW Wave Dragon is a slack moored device that can be deployed in large parks wherever a sufficient wave climate and a water depth of more than 20 m is found--typically this is the case in the North Sea and in the Atlantic, offering significant economic and environmental benefits for the EU. The primary objective of the project was to establish the scientific knowledge base needed for deploying a full-scale prototype of the overtopping wave energy converter Wave Dragon. This has been obtained through long-term field-testing on a test rig with all systems installed. The scale 1:4.5 prototype has an installed power of 20 kW corresponding to 4 MW in full-scale with full-turbine deployment and is grid connected. The scale 1:4.5 prototype has been designed based on the conclusions from a previous EU Craft project. The basic test rig construction is provided through a project sponsored by the Danish Energy Authority. The test site is in protected waters in Nissum Bredning, Denmark, where the wave climate resembles North Sea conditions (scale 1:4.5) which in accordance with model law resembles a power scale of 1:200. The test results after more than 20,000 hours of operation cover: Long-term field testing of turbine operation, control strategy testing and optimisation, power monitoring and evaluation, stress and strain measurements and analysis, and mooring and cable systems analysis. The model tools developed in the previous EU Craft project have been validated and slightly modified based on the measured data. A Life Cycle Analysis and Finite Element Modelling have been performed. A report on market analysis, economic risk assessment and job creation potential has also been carried out. The project has established the necessary scientific and technical knowledge base for engaging in the establishment of a full-scale prototype in exposed waters. This includes the existence of a well-established design basis and documentation of technical viability through long

  20. Time-domain simulation of constitutive relations for nonlinear acoustics including relaxation for frequency power law attenuation media modeling

    Science.gov (United States)

    Jiménez, Noé; Camarena, Francisco; Redondo, Javier; Sánchez-Morcillo, Víctor; Konofagou, Elisa E.

    2015-10-01

    We report a numerical method for solving the constitutive relations of nonlinear acoustics, where multiple relaxation processes are included in a generalized formulation that allows the time-domain numerical solution by an explicit finite differences scheme. Thus, the proposed physical model overcomes the limitations of the one-way Khokhlov-Zabolotskaya-Kuznetsov (KZK) type models and, due to the Lagrangian density is implicitly included in the calculation, the proposed method also overcomes the limitations of Westervelt equation in complex configurations for medical ultrasound. In order to model frequency power law attenuation and dispersion, such as observed in biological media, the relaxation parameters are fitted to both exact frequency power law attenuation/dispersion media and also empirically measured attenuation of a variety of tissues that does not fit an exact power law. Finally, a computational technique based on artificial relaxation is included to correct the non-negligible numerical dispersion of the finite difference scheme, and, on the other hand, improve stability trough artificial attenuation when shock waves are present. This technique avoids the use of high-order finite-differences schemes leading to fast calculations. The present algorithm is especially suited for practical configuration where spatial discontinuities are present in the domain (e.g. axisymmetric domains or zero normal velocity boundary conditions in general). The accuracy of the method is discussed by comparing the proposed simulation solutions to one dimensional analytical and k-space numerical solutions.