WorldWideScience

Sample records for testing results demonstrated

  1. Graphite electrode arc melter demonstration Phase 2 test results

    International Nuclear Information System (INIS)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O'Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau's Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of open-quotes as-receivedclose quotes heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process

  2. Graphite electrode arc melter demonstration Phase 2 test results

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O`Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau`s Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of {open_quotes}as-received{close_quotes} heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process.

  3. Arc melter demonstration baseline test results

    International Nuclear Information System (INIS)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O'Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process

  4. Fission Surface Power Technology Demonstration Unit Test Results

    Science.gov (United States)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Sanzi, James L.

    2016-01-01

    The Fission Surface Power (FSP) Technology Demonstration Unit (TDU) is a system-level demonstration of fission power technology intended for use on manned missions to Mars. The Baseline FSP systems consists of a 190 kWt UO2 fast-spectrum reactor cooled by a primary pumped liquid metal loop. This liquid metal loop transfers heat to two intermediate liquid metal loops designed to isolate fission products in the primary loop from the balance of plant. The intermediate liquid metal loops transfer heat to four Stirling Power Conversion Units (PCU), each of which produce 12 kWe (48 kW total) and reject waste heat to two pumped water loops, which transfer the waste heat to titanium-water heat pipe radiators. The FSP TDU simulates a single leg of the baseline FSP system using an electrically heater core simulator, a single liquid metal loop, a single PCU, and a pumped water loop which rejects the waste heat to a Facility Cooling System (FCS). When operated at the nominal operating conditions (modified for low liquid metal flow) during TDU testing the PCU produced 8.9 kW of power at an efficiency of 21.7 percent resulting in a net system power of 8.1 kW and a system level efficiency of 17.2 percent. The reduction in PCU power from levels seen during electrically heated testing is the result of insufficient heat transfer from the NaK heater head to the Stirling acceptor, which could not be tested at Sunpower prior to delivery to the NASA Glenn Research Center (GRC). The maximum PCU power of 10.4 kW was achieved at the maximum liquid metal temperature of 875 K, minimum water temperature of 350 K, 1.1 kg/s liquid metal flow, 0.39 kg/s water flow, and 15.0 mm amplitude at an efficiency of 23.3 percent. This resulted in a system net power of 9.7 kW and a system efficiency of 18.7 percent.

  5. Results and implications of the EBR-II inherent safety demonstration tests

    International Nuclear Information System (INIS)

    Planchon, H.P.; Golden, G.H.; Sackett, J.I.; Mohr, D.; Chang, L.K.; Feldman, E.E.; Betten, P.R.

    1987-01-01

    On April 3, 1986 two milestone tests were conducted in Experimental Breeder Reactor-2 (EBR-II). The first test was a loss of flow without scram and the second was a loss of heat sink without scram. Both tests were initiated from 100% power and in both tests the reactor was shut down by natural processes, principally thermal expansion, without automatic scram, operator intervention or the help of special in-core devices. The temperature transients during the tests were mild, as predicted, and there was no damage to the core or reactor plant structures. In a general sense, therefore, the tests plus supporting analysis demonstrated the feasibility of inherent passive shutdown for undercooling accidents in metal-fueled LMRs. The results provide a technical basis for future experiments in EBR-II to demonstrate inherent safety for overpower accidents and provide data for validation of computer codes used for design and safety analysis of inherently safe reactor plants

  6. Salt decontamination demonstration test results

    International Nuclear Information System (INIS)

    Snell, E.B.; Heng, C.J.

    1983-06-01

    The Salt Decontamination Demonstration confirmed that the precipitation process could be used for large-scale decontamination of radioactive waste sale solution. Although a number of refinements are necessary to safely process the long-term requirement of 5 million gallons of waste salt solution per year, there were no observations to suggest that any fundamentals of the process require re-evaluation. Major accomplishments were: (1) 518,000 gallons of decontaminated filtrate were produced from 427,000 gallons of waste salt solution from tank 24H. The demonstration goal was to produce a minimum of 200,000 gallons of decontaminated salt solution; (2) cesium activity in the filtrate was reduced by a factor of 43,000 below the cesium activity in the tank 24 solution. This decontamination factor (DF) exceeded the demonstration goal of a DF greater than 10,000; (3) average strontium-90 activity in the filtrate was reduced by a factor of 26 to less than 10 3 d/m/ml versus a goal of less than 10 4 d/m/ml; and (4) the concentrated precipitate was washed to a final sodium ion concentration of 0.15 M, well below the 0.225 M upper limit for DWPF feed. These accomplishments were achieved on schedule and without incident. Total radiation exposure to personnel was less than 350 mrem and resulted primarily from sampling precipitate slurry inside tank 48. 3 references, 6 figures, 2 tables

  7. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  8. SEXTANT X-Ray Pulsar Navigation Demonstration: Flight System and Test Results

    Science.gov (United States)

    Winternitz, Luke; Mitchell, Jason W.; Hassouneh, Munther A.; Valdez, Jennifer E.; Price, Samuel R.; Semper, Sean R.; Yu, Wayne H.; Ray, Paul S.; Wood, Kent S.; Arzoumanian, Zaven; hide

    2016-01-01

    The Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) is a technology demonstration enhancement to the Neutron-star Interior Composition Explorer (NICER) mission. NICER is a NASA Explorer Mission of Opportunity that will be hosted on the International Space Station (ISS). SEXTANT will, for the first time, demonstrate real-time, on-board X-ray Pulsar Navigation (XNAV), a significant milestone in the quest to establish a GPS-like navigation capability available throughout our Solar System and beyond. This paper gives an overview of the SEXTANT system architecture and describes progress prior to environmental testing of the NICER flight instrument. It provides descriptions and development status of the SEXTANT flight software and ground system, as well as detailed description and results from the flight software functional and performance testing within the high-fidelity Goddard Space Flight Center (GSFC) X-ray Navigation Laboratory Testbed (GXLT) software and hardware simulation environment. Hardware-in-the-loop simulation results are presented, using the engineering model of the NICER timing electronics and the GXLT pulsar simulator-the GXLT precisely controls NASA GSFC's unique Modulated X-ray Source to produce X-rays that make the NICER detector electronics appear as if they were aboard the ISS viewing a sequence of millisecond pulsars

  9. Development of large aperture telescope technology (LATT): test results on a demonstrator bread-board

    Science.gov (United States)

    Briguglio, R.; Xompero, M.; Riccardi, A.; Lisi, F.; Duò, F.; Vettore, C.; Gallieni, D.; Tintori, M.; Lazzarini, P.; Patauner, C.; Biasi, R.; D'Amato, F.; Pucci, M.; Pereira do Carmo, João.

    2017-11-01

    The concept of a low areal density primary mirror, actively controlled by actuators, has been investigated through a demonstration prototype. A spherical mirror (400 mm diameter, 2.7 Kg mass) has been manufactured and tested in laboratory and on the optical bench, to verify performance, controllability and optical quality. In the present paper we will describe the prototype and the test results.

  10. Non-Flow-Through Fuel Cell System Test Results and Demonstration on the SCARAB Rover

    Science.gov (United States)

    Scheidegger, Brianne, T.; Burke, Kenneth A.; Jakupca, Ian J.

    2012-01-01

    This paper describes the results of the demonstration of a non-flow-through PEM fuel cell as part of a power system on the SCARAB rover. A 16-cell non-flow-through fuel cell stack from Infinity Fuel Cell and Hydrogen, Inc. was incorporated into a power system designed to act as a range extender by providing power to the rover s hotel loads. This work represents the first attempt at a ground demonstration of this new technology aboard a mobile test platform. Development and demonstration were supported by the Office of the Chief Technologist s Space Power Systems Project and the Advanced Exploration System Modular Power Systems Project.

  11. Biodenitrification demonstration test report

    International Nuclear Information System (INIS)

    Benear, A.K.; Murray, S.J.; Lahoda, E.J.; Leslie, J.W.; Patton, J.B.; Menako, C.R.

    1987-08-01

    A two-column biodenitrification (BDN) facility was constructed at the Feed Materials Production Center (FMPC) in 1985 and 1986 to test the feasibility of biological treatment for industrial nitrate-bearing waste water generated at FMPC. This demonstration facility comprises one-half of the proposed four-column production facility. A demonstration test was conducted over a four month period in 1987. The results indicate the proposed BDN production facility can process FMPC industrial wastewater in a continuous manner while maintaining an effluent that will consistently meet the proposed NPDES limits for combined nitrate nitrogen (NO 3 -N) and nitrite nitrogen (NO 2 -N). The proposed NPDES limits are 62 kg/day average and 124 kg/day maximum. These limits were proportioned to determine that the two-column demonstration facility should meet the limits of 31 kg/day average and 62 kg/day maximum

  12. The progress and results of a demonstration test of a cavern-type disposal facility

    International Nuclear Information System (INIS)

    Akiyama, Yoshihiro; Terada, Kenji; Oda, Nobuaki; Yada, Tsutomu; Nakajima, Takahiro

    2011-01-01

    The cavern-type disposal facilities for low-level waste (LLW) with relatively high radioactivity levels mainly generated from power reactor decommissioning and for part of transuranic (TRU) waste mainly from spent fuel reprocessing are designed to be constructed in a cavern 50 to 100 meters below ground, and to employ an engineered barrier system (EBS) of a combination of bentonite and cement materials in Japan. In order to advance the feasibility study for these disposal, a government-commissioned research project named Demonstration Test of Cavern-Type Disposal Facility started in fiscal 2005, and since fiscal 2007 a full-scale mock-up test facility has been constructed under actual subsurface environment. The main objective of the test is to establish construction methodology and procedures which ensure the required quality of the EBS on-site. By fiscal 2009 some parts of the facility have been constructed, and the test has demonstrated both practicability of the construction and achievement of the quality. They are respectively taken as low-permeability of less than 5x10 13 m/s and low-diffusivity of less than 1x10 -12 m 2 /s at the time of completion of construction. This paper covers the project outline and the test results obtained by the construction of some parts of a bentonite and cement materials. (author)

  13. Radioactive waste incineration system cold demonstration test

    Energy Technology Data Exchange (ETDEWEB)

    Hozumi, Masahiro; Takaoku, Yoshinobu; Koyama, Shigeru; Nagae, Madoka; Seike, Yasuhiko; Yamanaka, Yasuhiro; Shibata, Kenji; Manabe, Kyoichi

    1984-12-01

    To demonstrate Waste Incineration System (WIS) which our company has been licensed by Combustion Engineering Inc., USA we installed a demonstration test plant in our Hiratsuka Research Laboratory and started the demonstration test on January 1984. One of the characteristics of this system is to be able to process many kinds of wastes with only one system, and to get high volume reduction factors. In our test plant, we processed paper, cloth, wood, polyethylene sheets as the samples of solid combustible wastes and spent ion exchange resins with incineration and processed condensed liquid wastes with spray drying. We have got good performances and enough Decontamination Factor (DF) data for the dust control equipment. In this paper, we introduce this demonstration test plant and report the test results up to date. (author).

  14. Ground test for vibration control demonstrator

    Science.gov (United States)

    Meyer, C.; Prodigue, J.; Broux, G.; Cantinaud, O.; Poussot-Vassal, C.

    2016-09-01

    In the objective of maximizing comfort in Falcon jets, Dassault Aviation is developing an innovative vibration control technology. Vibrations of the structure are measured at several locations and sent to a dedicated high performance vibration control computer. Control laws are implemented in this computer to analyse the vibrations in real time, and then elaborate orders sent to the existing control surfaces to counteract vibrations. After detailing the technology principles, this paper focuses on the vibration control ground demonstration that was performed by Dassault Aviation in May 2015 on Falcon 7X business jet. The goal of this test was to attenuate vibrations resulting from fixed forced excitation delivered by shakers. The ground test demonstrated the capability to implement an efficient closed-loop vibration control with a significant vibration level reduction and validated the vibration control law design methodology. This successful ground test was a prerequisite before the flight test demonstration that is now being prepared. This study has been partly supported by the JTI CleanSky SFWA-ITD.

  15. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    International Nuclear Information System (INIS)

    White, Maurice A.; Qiu Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's)

  16. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    Science.gov (United States)

    White, Maurice A.; Qiu, Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's). .

  17. Demonstration tests for manufacturing the ITER vacuum vessel

    International Nuclear Information System (INIS)

    Shimizu, Katsusuke; Onozuka, Masanori; Usui, Yukinori; Urata, Kazuhiro; Tsujita, Yoshihiro; Nakahira, Masataka; Takeda, Nobukazu; Kakudate, Satoshi; Ohmori, Junji; Shibanuma, Kiyoshi

    2007-01-01

    Demonstration tests for manufacturing and assembly of the International Thermonuclear Experimental Reactor (ITER) vacuum vessel have been conducted to confirm manufacturing and assembly process of the vacuum vessel (VV). The full-scale partial mock-up fabrication was planned and is in progress. The results will be available in the near future. Field-joint assembly procedure has been demonstrated using a test stand. Due to limited accessibility to the outer shell at the field joint, some operations, including alignment of the splice plates, field-joint welding, and examination, were found to be very difficult. In addition, a demonstration test on the selected back-seal structures was performed. It was found that the tested structures have insufficient sealing capabilities and need further improvement. The applicability of ultrasonic testing methods has been investigated. Although side drilled holes of 2.4 mm in diameter were detected, detection of the slit-type defects and defect characterization were found to be difficult. Feasibility test of liquid penetrant testing has revealed that the selected liquid penetrant testing (LPT) solutions have sufficient low outgas rates and are applicable to the VV

  18. Demonstration tests for manufacturing the ITER vacuum vessel

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Katsusuke [Mitsubishi Heavy Industries, Ltd., Kobe Shipyard and Machinery Works, Wadasaki-cho 1-1-1, Hyogo-ku, Kobe 652-8585 (Japan)], E-mail: katsusuke_shimizu@mhi.co.jp; Onozuka, Masanori [Mitsubishi Heavy Industries, Ltd., Konan 2-16-5, Minato-ku, Tokyo 108-8215 (Japan); Usui, Yukinori; Urata, Kazuhiro; Tsujita, Yoshihiro [Mitsubishi Heavy Industries, Ltd., Kobe Shipyard and Machinery Works, Wadasaki-cho 1-1-1, Hyogo-ku, Kobe 652-8585 (Japan); Nakahira, Masataka; Takeda, Nobukazu; Kakudate, Satoshi; Ohmori, Junji; Shibanuma, Kiyoshi [Japan Atomic Energy Agency, Mukouyama 801-1, Naka-machi, Naka-gun, Ibaraki 311-0193 (Japan)

    2007-10-15

    Demonstration tests for manufacturing and assembly of the International Thermonuclear Experimental Reactor (ITER) vacuum vessel have been conducted to confirm manufacturing and assembly process of the vacuum vessel (VV). The full-scale partial mock-up fabrication was planned and is in progress. The results will be available in the near future. Field-joint assembly procedure has been demonstrated using a test stand. Due to limited accessibility to the outer shell at the field joint, some operations, including alignment of the splice plates, field-joint welding, and examination, were found to be very difficult. In addition, a demonstration test on the selected back-seal structures was performed. It was found that the tested structures have insufficient sealing capabilities and need further improvement. The applicability of ultrasonic testing methods has been investigated. Although side drilled holes of 2.4 mm in diameter were detected, detection of the slit-type defects and defect characterization were found to be difficult. Feasibility test of liquid penetrant testing has revealed that the selected liquid penetrant testing (LPT) solutions have sufficient low outgas rates and are applicable to the VV.

  19. A Fault Sample Simulation Approach for Virtual Testability Demonstration Test

    Institute of Scientific and Technical Information of China (English)

    ZHANG Yong; QIU Jing; LIU Guanjun; YANG Peng

    2012-01-01

    Virtual testability demonstration test has many advantages,such as low cost,high efficiency,low risk and few restrictions.It brings new requirements to the fault sample generation.A fault sample simulation approach for virtual testability demonstration test based on stochastic process theory is proposed.First,the similarities and differences of fault sample generation between physical testability demonstration test and virtual testability demonstration test are discussed.Second,it is pointed out that the fault occurrence process subject to perfect repair is renewal process.Third,the interarrival time distribution function of the next fault event is given.Steps and flowcharts of fault sample generation are introduced.The number of faults and their occurrence time are obtained by statistical simulation.Finally,experiments are carried out on a stable tracking platform.Because a variety of types of life distributions and maintenance modes are considered and some assumptions are removed,the sample size and structure of fault sample simulation results are more similar to the actual results and more reasonable.The proposed method can effectively guide the fault injection in virtual testability demonstration test.

  20. Test plan for the retrieval demonstration

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1993-05-01

    This test plan describes a simulated buried waste retrieval demonstration that will be performed at the Caterpillar, Inc., Edwards Training Center located near Peoria, Illinois. The purpose of the demonstration is to determine the effectiveness of using readily available excavation equipment to retrieve, size, and handle various simulated waste forms that are similar in size, structure, and composition to those expected to be found in US Department of Energy contaminated waste pits and trenches. The objectives of this demonstration are to: meet and maintain daily production goals of 80 yd 3 /day; minimize spillage and dust generation through careful and deliberate operations; document and evaluate methods for manipulating, sizing, and/or working around large objects; and document and evaluate requirements for operator augmentation and remote operation for hot test pit excavation operations. Four conditions comprising the range of environments to be evaluated include excavation of random material from below grade; stacked boxes and barrels from below grade; random materials from at grade; and stacked boxes and barrels from at grade. Results of the retrieval demonstration will reduce unknowns in the body of knowledge about retrieval equipment and procedural options for removal of buried transuranic (TRU) waste at the Idaho National Engineering Laboratory. It is anticipated that DOE will factor this information into a remedial investigation/feasibility plan leading to a final record of decision for disposition of buried TRU waste

  1. Performance demonstration tests for eddy current inspection of steam generator tubing

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Heasler, P.G.; Anderson, C.M.

    1996-05-01

    This report describes the methodology and results for development of performance demonstration tests for eddy current (ET) inspection of steam generator tubes. Statistical test design principles were used to develop the performance demonstration tests. Thresholds on ET system inspection performance were selected to ensure that field inspection systems would have a high probability of detecting and and correctly sizing tube degradation. The technical basis for the ET system performance thresholds is presented in detail. Statistical test design calculations for probability of detection and flaw sizing tests are described. A recommended performance demonstration test based on the design calculations is presented. A computer program for grading the probability of detection portion of the performance demonstration test is given

  2. Performance demonstration tests for eddy current inspection of steam generator tubing

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, R.J.; Heasler, P.G.; Anderson, C.M.

    1996-05-01

    This report describes the methodology and results for development of performance demonstration tests for eddy current (ET) inspection of steam generator tubes. Statistical test design principles were used to develop the performance demonstration tests. Thresholds on ET system inspection performance were selected to ensure that field inspection systems would have a high probability of detecting and and correctly sizing tube degradation. The technical basis for the ET system performance thresholds is presented in detail. Statistical test design calculations for probability of detection and flaw sizing tests are described. A recommended performance demonstration test based on the design calculations is presented. A computer program for grading the probability of detection portion of the performance demonstration test is given.

  3. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  4. Integrating scientific results for a post-closure safety demonstration

    International Nuclear Information System (INIS)

    Taylor, E.C.; Ramspott, L.D.; Sinnock, S.; Sprecher, W.M.

    1994-01-01

    The U.S. Department of Energy (DOE) is developing a nuclear waste management system that will accept high-level radioactive waste, transport it, store it, and ultimately emplace it in a deep geologic repository. The key activity now is determining whether Yucca Mountain, Nevada is suitable as a site for the repository. If so, the crucial technological advance will be the demonstration that disposal of nuclear waste will be safe for thousands of years after closure. Recent regulatory, legal, and scientific developments imply that the safety demonstration must be simple. The scientific developments taken together support a simple set of hypotheses that constitute a post-closure safety argument for a repository at Yucca Mountain. If the understanding of Yucca Mountain hydrology presented in the Site Characterization Plan proves correct, then these hypotheses might be confirmed by combining results of Surface-Based Testing with early testing results in the Exploratory Studies Facility

  5. MODIL cryocooler producibility demonstration project results

    International Nuclear Information System (INIS)

    Cruz, G.E.; Franks, R.M.

    1993-01-01

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustively tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss observations regarding Industry's current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL's Phase I producibility demonstration project is presented

  6. Radioactive waste incineration system cold demonstration test, (2)

    Energy Technology Data Exchange (ETDEWEB)

    Hozumi, Masahiro; Seike, Yasuhiko; Takaoku, Yoshinobu; Yamanaka, Yasuhiro; Asahara, Masaharu; Katagiri, Keishi; Matsumoto, Kenji; Nagae, Madoka

    1985-12-01

    It is urgently necessary to solve the radioactive waste problem. As an effective means for the volume reduction of low-level radioactive wastes, an improved incineration system is greatly required. SHI's Waste Incineration (WIS) licensed by Combustion Engineering, Inc., has the significant advantage of processing a variety of wastes. We started a cold demonstration test in April, 1984 to verify the excellent performance of WIS. The test was successfully completed in September, 1985 with the record of more than 1000 hours of incineration testing time. In the present paper, we describe the test results during one and half years of test period.

  7. Phase 1: ISOCELL demonstration test performance review

    International Nuclear Information System (INIS)

    Chatwin, T.D.

    1991-04-01

    This document consolidates and organizes information available concerning cryogenic retrieval of hazardous, radioactive, and mixed wastes and is mainly derived from a report on the ISOCELL Demonstration Project prepared by Concept RKK, Ltd. ISOCELL cryogenic technology is designed to immobilize hazardous, radioactive, and mixed waste by creating a block of frozen waste and soil that can be safely retrieved, stored, transported, and treated with a minimum of dust. A test of the ISOCELL process was conducted in Carnation, Washington by Concept RKK, Ltd. Test conditions were compared to possible testing conditions at Idaho National Engineering Laboratory. Results indicate ISOCELL technology successfully froze wet soil into a soil block capable of being lifted. 5 refs., 6 figs., 1 tab

  8. Bayesian analysis of heat pipe life test data for reliability demonstration testing

    International Nuclear Information System (INIS)

    Bartholomew, R.J.; Martz, H.F.

    1985-01-01

    The demonstration testing duration requirements to establish a quantitative measure of assurance of expected lifetime for heat pipes was determined. The heat pipes are candidate devices for transporting heat generated in a nuclear reactor core to thermoelectric converters for use as a space-based electric power plant. A Bayesian analysis technique is employed, utilizing a limited Delphi survey, and a geometric mean accelerated test criterion involving heat pipe power (P) and temperature (T). Resulting calculations indicate considerable test savings can be achieved by employing the method, but development testing to determine heat pipe failure mechanisms should not be circumvented

  9. Subsurface barrier demonstration test strategy and performance specification

    International Nuclear Information System (INIS)

    Treat, R.L.; Cruse, J.M.

    1994-05-01

    This document was developed to help specify a major demonstration test project of subsurface barrier systems supporting the Tank Waste Remediation System (TWRS) Program. The document focuses discussion on requirements applicable to demonstration of three subsurface barrier concepts: (1) Injected Material, (2) Cryogenic, and (3) Desiccant. Detailed requirements are provided for initial qualification of a technology proposal followed by the pre-demonstration and demonstration test requirements and specifications. Each requirement and specification is accompanied by a discussion of the rationale for it. The document also includes information on the Hanford Site tank farms and related data; the related and currently active technology development projects within the DOE's EM-50 Program; and the overall demonstration test strategy. Procurement activities and other preparations for actual demonstration testing are on hold until a decision is made regarding further development of subsurface barriers. Accordingly, this document is being issued for information only

  10. The Majorana Demonstrator Status and Preliminary Results

    Science.gov (United States)

    Yu, C.-H.; Alvis, S. I.; Arnquist, I. J.; Avignone, F. T.; Barabash, A. S.; Barton, C. J.; Bertrand, F. E.; Bode, T.; Brudanin, V.; Busch, M.; Buuck, M.; Caldwell, T. S.; Chan, Y.-D.; Christofferson, C. D.; Chu, P.-H.; Cuesta, C.; Detwiler, J. A.; Dunagan, C.; Efremenko, Yu; Ejiri, H.; Elliott, S. R.; Gilliss, T.; Giovanetti, G. K.; Green, M.; Gruszko, J.; Guinn, I. S.; Guiseppe, V. E.; Haufe, C. R.; Hehn, L.; Henning, R.; Hoppe, E. W.; Howe, M. A.; Keeter, K. J.; Kidd, M. F.; Konovalov, S. I.; Kouzes, R. T.; Lopez, A. M.; Martin, R. D.; Massarczyk, R.; Meijer, S. J.; Mertens, S.; Myslik, J.; Othman, G.; Pettus, W.; Poon, A. W. P.; Radford, D. C.; Rager, J.; Reine, A. L.; Rielage, K.; Ruof, N. W.; Shanks, B.; Shirchenko, M.; Suriano, A. M.; Tedeschi, D.; Varner, R. L.; Vasilyev, S.; Vetter, K.; Vorren, K.; White, B. R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Yumatov, V.; Zhitnikov, I.; Zhu, B. Z.

    2018-05-01

    The MAJORANA Collaboration is using an array of high-purity Ge detectors to search for neutrinoless double-beta decay in 76Ge. Searches for neutrinoless double-beta decay are understood to be the only viable experimental method for testing the Majorana nature of the neutrino. Observation of this decay would imply violation of lepton number, that neutrinos are Majorana in nature, and provide information on the neutrino mass. The MAJORANA DEMONSTRATOR comprises 44.1 kg of p-type point-contact Ge detectors (29.7 kg enriched in 76Ge) surrounded by a low-background shield system. The experiment achieved a high efficiency of converting raw Ge material to detectors and an unprecedented detector energy resolution of 2.5 keV FWHM at Qββ. The MAJORANA collaboration began taking physics data in 2016. This paper summarizes key construction aspects of the Demonstrator and shows preliminary results from initial data.

  11. Demonstration test of in-service inspection methods

    International Nuclear Information System (INIS)

    Takumi, Kenji

    1987-01-01

    The major objectives of the project are: (1) to demonstrate the reliability of a manual ultrasonic flaw detector and techniques that are used in operating light water reactor plants and (2) to demonstrate the performance and reliability of an automatic ultrasonic flaw detector that is designed to shorten the time required for ISI work and reduce the exposure risk of inspection personnel. The test project consists of three stages. In the first stage, which ended in 1982, defects were added intentionally to a model structure the same in size as a typical 1.1 million kW BWR plant and manual ultrasonic flaw detection tensting was performed. In the second stage, completed in 1984, automatic eddy-current flaw detection testing was carried out for defects in heat transfer piping of a PWP steam generator. In the third stage, which started in 1981 and ended in March 1987, a newly developed automatic ultrasonic flaw detector is applied to testing of defects used for the manual detector performance evaluation. Results have shown that the automatic eddy-current flaw detector under test has an adequately stable performance for practical uses, with a very high reproducibility to permit close inspection of secular deterioration in heat transfer pipes. It has also revealed that both the manual and automatic ultrasonic flaw detectors under test can detect all defects that do not comply with the ASME standards. (Nogami, K.)

  12. Safety demonstration test (SR-1/S1C-1) plan of HTTR (Contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Nakagawa, Shigeaki; Sakaba, Nariaki; Takada, Eiji; Tachibana, Yukio; Saito, Kenji; Furusawa, Takayuki; Sawa, Kazuhiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2003-03-01

    Safety demonstration tests in the HTTR (High Temperature Engineering Test Reactor) will be carried out in order to verify inherent safety features of the HTGR (High Temperature Gas-cooled Reactor). The first phase of the safety demonstration tests includes the reactivity insertion test by the control rod withdrawal and the coolant flow reduction test by the circulator trip. In the second phase, accident simulation tests will be conducted. By comparison of their experimental and analytical results, the prediction capability of the safety evaluation codes such as the core and the plant dynamics codes will be improved and verified, which will contribute to establish the safety design and the safety evaluation technologies of the HTGRs. The results obtained through its safety demonstration tests will be also utilised for the establishment of the safety design guideline, the safety evaluation guideline, etc. This paper describes the test program of the overall safety demonstration tests and the test method, the test conditions and the results of the pre-test analysis of the reactivity insertion test and the partial gas circulator trip test planned in March 2003. (author)

  13. Antares: preliminary demonstrator results

    International Nuclear Information System (INIS)

    Kouchner, A.

    2000-05-01

    The ANTARES collaboration is building an undersea neutrino telescope off Toulon (Mediterranean sea) with effective area ∼ 0.1 km 2 . An extensive study of the site properties has been achieved together with software analysis in order to optimize the performance of the detector. Results are summarized here. An instrumented line, linked to shore for first time via an electro-optical cable, has been immersed late 1999. The preliminary results of this demonstrator line are reported. (author)

  14. Status of disposal techniques for spent fuel in Germany: Results of demonstration tests for direct disposal

    International Nuclear Information System (INIS)

    Engelmann, H.J.; Filbert, W.

    1993-01-01

    According to the Atomic Energy Act (1985) the Federal Government is responsible for establishing facilities to indemnify and dispose radioactive waste. According to Art. 9b of the Atomic Energy Act (1986) the construction and operation of such a repository requires approval of a plan. According to safety criteria applicable for disposing radioactive waste in mines, construction and operation of repository mines require application of acknowledged rules of technology, laws, ordinances and other regulations to protect operating staff and population from radiation damages. Shaft hoisting equipment for the transportation of radioactive waste in a repository mine must satisfy normal operational tasks and meet special safety-requirements. Its failure may result in danger for persons, release of radioactive substances into the plant and environment. That means, shaft hoisting equipment must be designed to satisfy the necessary safety requirements and be state of the art of science and technology. The aim of these demonstration tests is verification of technical feasibility of a shaft hoisting equipment with a payload of 85 t, underground for drift disposal of POLLUX-casks, and essential machine and mine-technical systems and components. The demonstration also includes safe radiation protection during transport and disposal operations. Investigations assume that radioactive waste is transported in containers that satisfy transport requirements for dangerous goods and have a type-B-certificate

  15. Reliability demonstration test planning using bayesian analysis

    International Nuclear Information System (INIS)

    Chandran, Senthil Kumar; Arul, John A.

    2003-01-01

    In Nuclear Power Plants, the reliability of all the safety systems is very critical from the safety viewpoint and it is very essential that the required reliability requirements be met while satisfying the design constraints. From practical experience, it is found that the reliability of complex systems such as Safety Rod Drive Mechanism is of the order of 10 -4 with an uncertainty factor of 10. To demonstrate the reliability of such systems is prohibitive in terms of cost and time as the number of tests needed is very large. The purpose of this paper is to develop a Bayesian reliability demonstrating testing procedure for exponentially distributed failure times with gamma prior distribution on the failure rate which can be easily and effectively used to demonstrate component/subsystem/system reliability conformance to stated requirements. The important questions addressed in this paper are: With zero failures, how long one should perform the tests and how many components are required to conclude with a given degree of confidence, that the component under test, meets the reliability requirement. The procedure is explained with an example. This procedure can also be extended to demonstrate with more number of failures. The approach presented is applicable for deriving test plans for demonstrating component failure rates of nuclear power plants, as the failure data for similar components are becoming available in existing plants elsewhere. The advantages of this procedure are the criterion upon which the procedure is based is simple and pertinent, the fitting of the prior distribution is an integral part of the procedure and is based on the use of information regarding two percentiles of this distribution and finally, the procedure is straightforward and easy to apply in practice. (author)

  16. Ball Aerospace SBMD Coating Test Results

    Science.gov (United States)

    Brown, Robert; Lightsey, Paul; Russell, J. Kevin (Technical Monitor)

    2002-01-01

    The Sub-scale Beryllium Mirror Demonstrator that was successfully tested to demonstrate cryogenic figuring of a bare mirror has been coated with a protected gold reflective surface and retested at cryogenic temperatures. Results showing less than 9 nm rms surface distortion attributable to the added coating are presented.

  17. Performance demonstration experience for reactor pressure vessel shell ultrasonic testing

    International Nuclear Information System (INIS)

    Zado, V.

    1998-01-01

    The most ultrasonic testing techniques used by many vendors for pressurized water reactor (PWR) examinations were based on American Society of Mechanical Engineers 'Boiler and Pressurized Vessel Code' (ASME B and PV Code) Sections XI and V. The Addenda of ASME B and PV Code Section XI, Edition 1989 introduced Appendix VIII - 'Performance Demonstration for Ultrasonic Examination Systems'. In an effort to increase confidence in performance of ultrasonic testing of the operating nuclear power plants in United States, the ultrasonic testing performance demonstration examination of reactor vessel welds is performed in accordance with Performance Demonstration Initiative (PDI) program which is based on ASME Code Section XI, Appendix VIII requirements. This article provides information regarding extensive qualification preparation works performed prior EPRI guided performance demonstration exam of reactor vessel shell welds accomplished in January 1997 for the scope of Appendix VIII, Supplements IV and VI. Additionally, an overview of the procedures based on requirements of ASME Code Section XI and V in comparison to procedure prepared for Appendix VIII examination is given and discussed. The samples of ultrasonic signals obtained from artificial flaws implanted in vessel material are presented and results of ultrasonic testing are compared to actual flaw sizes. (author)

  18. Engineering model cryocooler test results

    International Nuclear Information System (INIS)

    Skimko, M.A.; Stacy, W.D.; McCormick, J.A.

    1992-01-01

    This paper reports that recent testing of diaphragm-defined, Stirling-cycle machines and components has demonstrated cooling performance potential, validated the design code, and confirmed several critical operating characteristics. A breadboard cryocooler was rebuilt and tested from cryogenic to near-ambient cold end temperatures. There was a significant increase in capacity at cryogenic temperatures and the performance results compared will with code predictions at all temperatures. Further testing on a breadboard diaphragm compressor validated the calculated requirement for a minimum axial clearance between diaphragms and mating heads

  19. Test plan for air monitoring during the Cryogenic Retrieval Demonstration

    International Nuclear Information System (INIS)

    Yokuda, E.

    1992-06-01

    This report presents a test plan for air monitoring during the Cryogenic Retrieval Demonstration (CRD). Air monitors will be used to sample for the tracer elements neodymium, terbium, and ytterbium, and dysprosium. The results from this air monitoring will be used to determine if the CRD is successful in controlling dust and minimizing contamination. Procedures and equipment specifications for the test are included

  20. Testing and demonstrations in ONKALO - aims and needs

    International Nuclear Information System (INIS)

    Anttila, P.; Hellae, P.; Haapala, K.

    2009-04-01

    Posiva Oy is preparing to submit an application for the construction license for a disposal facility at Olkiluoto by the end of 2012. An essential part of the repository development is the construction of the underground research and characterisation facility, ONKALO, which will later be a part of the disposal facility. The construction of ONKALO was commenced in 2004 in order to obtain information on detailed characteristics of the bedrock not possible to provide from the ground surface. ONKALO enables to test and demonstrate the disposal system as designed in a real environment. The objective of this report is to outline the plans for testing and demonstrations for more detailed elaboration of the operational activities and their schedule for the next ten years or more. The main focus is the work to be done in ONKALO, but also other laboratories and facilities above and below ground are considered. The reference design considered here is KBS-3V, but many of the tests and demonstrations proposed are also beneficial for the alternative design, KBS-3H as well. The tests and demonstrations discussed in this report concern activities relating to investigation, construction and operation of the disposal facility. The report shortly describes the current status for the activities and after that preliminary plans for testing and demonstrations are presented for each of them. Finally the location for the performance of the activities and the preliminary time schedule for them are discussed

  1. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  2. Safety demonstration test on solvent fire in fuel reprocessing plant

    International Nuclear Information System (INIS)

    Nishio, Gunji; Hashimoto, Kazuichiro

    1989-03-01

    This report summarizes a fundamental of results obtained in the Reprocessing Plant Safety Demonstration Test Program which was performed under the contract between the Science and Technology Agency of Japan and the Japan Atomic Energy Research Institute. In this test program, a solvent fire was hypothesized, and such data were obtained as fire behavior, smoke behavior and integrity of exhaust filters in the ventilation system. Through the test results, it was confirmed that under the fire condition in hypothetical accident, the integrity of the cell and the cell ventilation system were maintained, and the safety function of the exhaust filters was maintained against the smoke loading. Analytical results by EVENT code agreed well with the present test data on the thermofluid flow in a cell ventilation system. (author)

  3. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  4. MAVL wastes containers functional demonstration and associated tests program

    International Nuclear Information System (INIS)

    Templier, J.C.

    2002-01-01

    In the framework of studies on the MAVL wastes, the CEA develops containers for middle time wastes storage. This program aims to realize a ''B wastes containers'' demonstrator. A demonstrator is a container, parts of a container or samples which must validate the tests. This document presents the state of the study in the following three chapters: functions description, base data and design choices; presentation of the functional demonstrators; demonstration tests description. (A.L.B.)

  5. Test Plan for the overburden removal demonstration

    International Nuclear Information System (INIS)

    Rice, P.; Thompson, D.; Winberg, M.; Skaggs, J.

    1993-06-01

    The removal of soil overburdens from contaminated pits and trenches involves using equipment that will remove a small layer of soil from 3 to 6 in. at any time. As a layer of soil is removed, overburden characterization techniques perform surveys to a depth that exceeds each overburden removal layer to ensure that the removed soil will be free of contamination. It is generally expected that no contamination will be found in the soil overburden, which was brought in after the waste was put in place. It is anticipated that some containers in the waste zone have lost their integrity, and the waste leakage from those containers has migrated by gravity downward into the waste zone. To maintain a safe work environment, this method of overburden removal should allow safe preparation of a pit or trench for final remediation. To demonstrate the soil overburden techniques, the Buried Waste Integrated Demonstration Program has contracted vendor services to provide equipment and techniques demonstrating soil overburden removal technology. The demonstration will include tests that will evaluate equipment performance and techniques for removal of overburden soil, control of contamination spread, and dust control. To evaluate the performance of these techniques, air particulate samples, physical measurements of the excavation soil cuts, maneuverability measurements, and time versus volume (rate) of soil removal data will be collected during removal operations. To provide a medium for sample evaluation, the overburden will be spiked at specific locations and depths with rare earth tracers. This test plan will be describe the objectives of the demonstration, data quality objectives, methods to be used to operate the equipment and use the techniques in the test area, and methods to be used in collecting data during the demonstration

  6. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  7. WIS decontamination factor demonstration test with radioactive nuclides

    International Nuclear Information System (INIS)

    Kanbe, Hiromi; Mayuzumi, Masami; Ono, Tetsuo; Nagae, Madoka; Sekiguchi, Ryosaku; Takaoku, Yoshinobu.

    1987-01-01

    A radioactive Waste Incineration System (WIS) with suspension combustion is noticed as effective volume reduction technology of low level radiactive wastes that are increasing every year. In order to demonstrate the decontamination efficiency of ceramic filter used on WIS, this test has been carried out with the test facilities as joint research of Central Research Institute of Electric Power Industry (CRIEPI) and Sumitomo Heavy Industries, Ltd. Miscellaneous combustible waste and power resin, to which 5 nuclides (Mn-54, Fe-59, Co-60, Zn-65, Cs-137) were added, were used as samples for incineration. As the result of the test, it was verified that Decontamination Factor (DF) of the single stage ceramic filter was usually kept over 10 5 for every nuclide, and from the results of above DF, over 10 8 is expected for real commercial plant as a total system. Therefore, it is realized that the off-gas clean up system of the WIS composed of only single stage of ceramic filter is capable of sufficiently efficient decontamination of exhaust gas to be released to stack. (author)

  8. Ground testing and flight demonstration of charge management of insulated test masses using UV-LED electron photoemission

    Science.gov (United States)

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; Suwaidan, Badr Al; AlRashed, Abdullah; Al-Nassban, Badr; Alaqeel, Faisal; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin; Qasim, Bandar Bin; Alfauwaz, Abdulrahman; Al-Majed, Mohammed; DeBra, Daniel; Byer, Robert

    2016-12-01

    The UV-LED mission demonstrates the precise control of the potential of electrically isolated test masses. Test mass charge control is essential for the operation of space accelerometers and drag-free sensors which are at the core of geodesy, aeronomy and precision navigation missions as well as gravitational wave experiments and observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on Gravity Probe B and is presently part of the LISA Pathfinder technology demonstration. The UV-LED mission and prior ground testing demonstrates that AlGaN UVLEDs operating at 255 nm are superior to Hg lamps because of their smaller size, lower power draw, higher dynamic range, and higher control authority. We show laboratory data demonstrating the effectiveness and survivability of the UV-LED devices and performance of the charge management system. We also show flight data from a small satellite experiment that was one of the payloads on KACST’s SaudiSat-4 mission that demonstrates ‘AC charge control’ (UV-LEDs and bias are AC modulated with adjustable relative phase) between a spherical test mass and its housing. The result of the mission brings the UV-LED device Technology Readiness Level (TRL) to TRL-9 and the charge management system to TRL-7. We demonstrate the ability to control the test mass potential on an 89 mm diameter spherical test mass over a 20 mm gap in a drag-free system configuration, with potential measured using an ultra-high impedance contact probe. Finally, the key electrical and optical characteristics of the UV-LEDs showed less than 7.5% change in performance after 12 months in orbit.

  9. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Research, development, demonstration, and testing. 1021... ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.212 Research, development, demonstration, and testing. (a) This section applies to the adoption and application of programs that involve research...

  10. Demonstration test of 'multi-purpose incinerating melter system'

    International Nuclear Information System (INIS)

    Miyazaki, Hitoshi; Tanimoto, Kenichi; Wakui, Hitoshi; Oasada, Kaoru; Ishikawa, Fuyuhiko.

    1994-01-01

    A Multi-Purpose Incinerating Melter System (MIMS) has been developed as a volume reduction technique for a wide variety of radwastes including flame retardants such as spent resin, and non-combustible materials such as concrete, glass and steel. In the MIMS, these wastes are incinerated and/or melted at temperatures between 1,000 and 1,500degC generated by fossil fueled burner to produce obsidian-like ingots with high integrity. A demonstration test program was carried out from 1989 until 1991 using an engineering-scale demonstration unit. In the test program, various simulated wastes with traces of 60 Co, 54 Mn, 59 Fe, 137 Cs, 22 Na and 106 Ru were treated to obtain decontamination factor (DF) data and leach-resistance data of the products. The summarized results drawn from the 13 runs of demonstrative operations are the following: (1) Most involatile radionuclides are transferred into solidified products. (2) Global DF of the system excluding a HEPA filter ranged 1x10 4 thru 1x10 5 for 60 Co, 2x10 2 thru 2x10 3 for 137 Cs and 2x10 2 thru 1x10 4 for 106 Ru. (3) Leaching resistance of the solidified product is a match for that of a typical borosilicate glass waste form. (author)

  11. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  12. Reliability demonstration test planning: A three dimensional consideration

    International Nuclear Information System (INIS)

    Yadav, Om Prakash; Singh, Nanua; Goel, Parveen S.

    2006-01-01

    Increasing customer demand for reliability, fierce market competition on time-to-market and cost, and highly reliable products are making reliability testing more challenging task. This paper presents a systematic approach for identifying critical elements (subsystems and components) of the system and deciding the types of test to be performed to demonstrate reliability. It decomposes the system into three dimensions (i.e. physical, functional and time) and identifies critical elements in the design by allocating system level reliability to each candidate. The decomposition of system level reliability is achieved by using criticality index. The numerical value of criticality index for each candidate is derived based on the information available from failure mode and effects analysis (FMEA) document or warranty data from a prior system. It makes use of this information to develop reliability demonstration test plan for the identified (critical) failure mechanisms and physical elements. It also highlights the benefits of using prior information in order to locate critical spots in the design and in subsequent development of test plans. A case example is presented to demonstrate the proposed approach

  13. Test and Demonstration Assets of New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-03-31

    This document was developed by the Arrowhead Center of New Mexico State University as part of the National Security Preparedness Project (NSPP), funded by a DOE/NNSA grant. The NSPP has three primary components: business incubation, workforce development, and technology demonstration and validation. The document contains a survey of test and demonstration assets in New Mexico available for external users such as small businesses with security technologies under development. Demonstration and validation of national security technologies created by incubator sources, as well as other sources, are critical phases of technology development. The NSPP will support the utilization of an integrated demonstration and validation environment.

  14. Ground testing and flight demonstration of charge management of insulated test masses using UV-LED electron photoemission

    International Nuclear Information System (INIS)

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Alfauwaz, Abdulrahman; DeBra, Daniel; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; Suwaidan, Badr Al; AlRashed, Abdullah; Al-Nassban, Badr; Alaqeel, Faisal; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin; Qasim, Bandar Bin; Al-Majed, Mohammed

    2016-01-01

    The UV-LED mission demonstrates the precise control of the potential of electrically isolated test masses. Test mass charge control is essential for the operation of space accelerometers and drag-free sensors which are at the core of geodesy, aeronomy and precision navigation missions as well as gravitational wave experiments and observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on Gravity Probe B and is presently part of the LISA Pathfinder technology demonstration. The UV-LED mission and prior ground testing demonstrates that AlGaN UVLEDs operating at 255 nm are superior to Hg lamps because of their smaller size, lower power draw, higher dynamic range, and higher control authority. We show laboratory data demonstrating the effectiveness and survivability of the UV-LED devices and performance of the charge management system. We also show flight data from a small satellite experiment that was one of the payloads on KACST’s SaudiSat-4 mission that demonstrates ‘AC charge control’ (UV-LEDs and bias are AC modulated with adjustable relative phase) between a spherical test mass and its housing. The result of the mission brings the UV-LED device Technology Readiness Level (TRL) to TRL-9 and the charge management system to TRL-7. We demonstrate the ability to control the test mass potential on an 89 mm diameter spherical test mass over a 20 mm gap in a drag-free system configuration, with potential measured using an ultra-high impedance contact probe. Finally, the key electrical and optical characteristics of the UV-LEDs showed less than 7.5% change in performance after 12 months in orbit. (paper)

  15. Demonstration tests for HTGR fuel elements and core components with test sections in HENDEL

    Energy Technology Data Exchange (ETDEWEB)

    Miyamoto, Yoshiaki; Hino, Ryutaro; Inagaki, Yoshiyuki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    1995-03-01

    In the fuel stack test section (T{sub 1}) of the Helium Engineering Demonstration Loop (HENDEL), thermal and hydraulic performances of helium gas flows through a fuel rod channel and a fuel stack have been investigated for the High-Temperature Engineering Test Reactor (HTTR) core thermal design. The test data showed that the turbulent characteristics appearing in the Reynolds number above 2000: no typical behavior in the transition zone, and friction factors and heat transfer coefficients in the fuel channel were found to be higher than those in a smooth annular channel. Heat transfer behavior of gas flow in a fuel element channel with blockage and cross-flow through a gap between upper and lower fuel elements stacked was revealed using the mock-up models. On the other hand, demonstration tests have been performed to verify thermal and hydraulic characteristics and structural integrity related to the core bottom structure using a full-scale test facility named as the in-core structure test section (T{sub 2}). The sealing performance test revealed that the leakage of low-temperature helium gas through gaps between the permanent reflector blocks to the core was very low level compared with the HTTR design value and no change of the leakage flow rate were observed after a long term operation. The heat transfer tests including thermal transient at shutdown of gas circulators verified good insulating performance of core insulation structures in the core bottom structure and the hot gas duct; the temperature of the metal portion of these structure was below the design value. Examination of the thermal mixing characteristics indicated that the mixing of the hot helium gas started at a hot plenum and finished completely at downstream of the outlet hot gas duct. The present results obtained from these demonstration tests have been practically applied to the detailed design works and licensing procedures of the HTTR. (J.P.N.) 92 refs.

  16. Demonstration test for transporting vitrified high-level radioactive wastes

    International Nuclear Information System (INIS)

    Ito, C.; Kato, Y.; Kato, O.

    1993-01-01

    The purpose of this study was to demonstrate the integrity of the cask against a 0.3-m free-drop test and to confirm the drop-test analytical method. 1. Test cask; The cask used in the drop test is characterized structurally as follows. (1) The Cask body is covered with a neutron absorber covered with a thin steel plate. Fins are attached between the cask body and thin steel plate. (2) The impact energy was absorbed mainly by the inelastic deformation of the neutron absorber and thin steel plate. 2. Test methods; Electric heaters were put into the package to reproduce the real cask conditions. Strains and accelerations due to the drop were measured at the drop by the strain gauges and accelerometers attached on the cask. 3. Analysis; We use the DYNA-3D and NIKE-2D codes to analyze the drop test. A half symmetrical model was applied to overall analysis to calculate the strains and accelerations at the cask body. The maximum acceleration value obtained by the overall analysis and basket model were used to statistically calculate the strains at the basket. 4. Results; The cask integrity was comfirmed through the strains and the results of He leak test. (author)

  17. Magnetic Launch Assist Demonstration Test

    Science.gov (United States)

    2001-01-01

    This image shows a 1/9 subscale model vehicle clearing the Magnetic Launch Assist System, formerly referred to as the Magnetic Levitation (MagLev), test track during a demonstration test conducted at the Marshall Space Flight Center (MSFC). Engineers at MSFC have developed and tested Magnetic Launch Assist technologies. To launch spacecraft into orbit, a Magnetic Launch Assist System would use magnetic fields to levitate and accelerate a vehicle along a track at very high speeds. Similar to high-speed trains and roller coasters that use high-strength magnets to lift and propel a vehicle a couple of inches above a guideway, a launch-assist system would electromagnetically drive a space vehicle along the track. A full-scale, operational track would be about 1.5-miles long and capable of accelerating a vehicle to 600 mph in 9.5 seconds. This track is an advanced linear induction motor. Induction motors are common in fans, power drills, and sewing machines. Instead of spinning in a circular motion to turn a shaft or gears, a linear induction motor produces thrust in a straight line. Mounted on concrete pedestals, the track is 100-feet long, about 2-feet wide and about 1.5-feet high. The major advantages of launch assist for NASA launch vehicles is that it reduces the weight of the take-off, the landing gear, the wing size, and less propellant resulting in significant cost savings. The US Navy and the British MOD (Ministry of Defense) are planning to use magnetic launch assist for their next generation aircraft carriers as the aircraft launch system. The US Army is considering using this technology for launching target drones for anti-aircraft training.

  18. Demonstration test of 'multi-purpose incinerating melter system'

    Energy Technology Data Exchange (ETDEWEB)

    Miyazaki, Hitoshi; Tanimoto, Kenichi [Power Reactor and Nuclear Fuel Development Corp., Oarai, Ibaraki (Japan). Oarai Engineering Center; Wakui, Hitoshi; Oasada, Kaoru; Ishikawa, Fuyuhiko

    1994-03-01

    A Multi-Purpose Incinerating Melter System (MIMS) has been developed as a volume reduction technique for a wide variety of radwastes including flame retardants such as spent resin, and non-combustible materials such as concrete, glass and steel. In the MIMS, these wastes are incinerated and/or melted at temperatures between 1,000 and 1,500degC generated by fossil fueled burner to produce obsidian-like ingots with high integrity. A demonstration test program was carried out from 1989 until 1991 using an engineering-scale demonstration unit. In the test program, various simulated wastes with traces of [sup 60]Co, [sup 54]Mn, [sup 59]Fe, [sup 137]Cs, [sup 22]Na and [sup 106]Ru were treated to obtain decontamination factor (DF) data and leach-resistance data of the products. The summarized results drawn from the 13 runs of demonstrative operations are the following: (1) Most involatile radionuclides are transferred into solidified products. (2) Global DF of the system excluding a HEPA filter ranged 1x10[sup 4] thru 1x10[sup 5] for [sup 60]Co, 2x10[sup 2] thru 2x10[sup 3] for [sup 137]Cs and 2x10[sup 2] thru 1x10[sup 4] for [sup 106]Ru. (3) Leaching resistance of the solidified product is a match for that of a typical borosilicate glass waste form. (author).

  19. Demonstration test of the spent fuel rod cutting process with tube cutter mechanism

    International Nuclear Information System (INIS)

    Lee, Jong Youl; Jung, Jae Hoo; Hong, Dong Hee; Yoon, Ji Sup; Lee, Eun Pyo

    2001-03-01

    In this paper, the verification by computer graphics technology for the spent fuel rod cutting devise which belongs to the spent fuel disassembly processes, the performance tests of the real device, and the demonstration tests with tube cutter mechanism are described. The graphical design system is used throughout the design stages from conceptual design to motion analysis like collision detection. By using this system, the device and the process are optimized. The performance test of the real device and the demonstration test using the tube cutter mechanism in the hot cell are carried out. From these results, the spent fuel rod cutting device is improved based on the considerations of circularity of the rod cross-section, debris generation, and fire risk etc. Also, this device is improved to be operated automatically via remote control system considering later use in closed environment like Hot-cell (radioactive area) and the modulization in the structure of this device makes maintenance easy. The result of the performance test and the demonstration in this report is expected to contribute to the optimization of the pre-treatment processes for the reuse of the spent fuel like DUPIC process and the final disposal

  20. Nuclear waste repository transparency technology test bed demonstrations at WIPP

    International Nuclear Information System (INIS)

    Betsill J, David; Elkins, Ned Z.; Wu, Chuan-Fu; Mewhinney, James D.; Aamodt, Paul

    2000-01-01

    repository, the Waste Isolation Pilot Plant (WIPP) offers a unique opportunity to serve as an international cooperative test bed for developing and demonstrating technologies and processes in a fully operational repository system setting. To address the substantial national security implications for the US resulting from the lack of integrated, transparent management and disposition of nuclear materials at the back-end of the nuclear fuel and weapons cycles, it is proposed that WIPP be used as a test bed to develop and demonstrate technologies that will enable the transparent and proliferation-resistant geologic isolation of nuclear materials. The objectives of this initiative are to: (1) enhance public confidence in safe, secure geologic isolation of nuclear materials; (2) develop, test, and demonstrate transparency measures and technologies for the back-end of nuclear fuel cycle; and (3) foster international collaborations leading to workable, effective, globally-accepted standards for the transparent monitoring of geological repositories for nuclear materials. Test-bed activities include: development and testing of monitoring measures and technologies; international demonstration experiments; transparency workshops; visiting scientist exchanges; and educational outreach. These activities are proposed to be managed by the Department of Energy/Carlsbad Area Office (DOE/CAO) as part of The Center for Applied Repository and Underground Studies (CARUS)

  1. FINAL SIMULATION RESULTS FOR DEMONSTRATION CASE 1 AND 2

    Energy Technology Data Exchange (ETDEWEB)

    David Sloan; Woodrow Fiveland

    2003-10-15

    The goal of this DOE Vision-21 project work scope was to develop an integrated suite of software tools that could be used to simulate and visualize advanced plant concepts. Existing process simulation software did not meet the DOE's objective of ''virtual simulation'' which was needed to evaluate complex cycles. The overall intent of the DOE was to improve predictive tools for cycle analysis, and to improve the component models that are used in turn to simulate equipment in the cycle. Advanced component models are available; however, a generic coupling capability that would link the advanced component models to the cycle simulation software remained to be developed. In the current project, the coupling of the cycle analysis and cycle component simulation software was based on an existing suite of programs. The challenge was to develop a general-purpose software and communications link between the cycle analysis software Aspen Plus{reg_sign} (marketed by Aspen Technology, Inc.), and specialized component modeling packages, as exemplified by industrial proprietary codes (utilized by ALSTOM Power Inc.) and the FLUENT{reg_sign} computational fluid dynamics (CFD) code (provided by Fluent Inc). A software interface and controller, based on an open CAPE-OPEN standard, has been developed and extensively tested. Various test runs and demonstration cases have been utilized to confirm the viability and reliability of the software. ALSTOM Power was tasked with the responsibility to select and run two demonstration cases to test the software--(1) a conventional steam cycle (designated as Demonstration Case 1), and (2) a combined cycle test case (designated as Demonstration Case 2). Demonstration Case 1 is a 30 MWe coal-fired power plant for municipal electricity generation, while Demonstration Case 2 is a 270 MWe, natural gas-fired, combined cycle power plant. Sufficient data was available from the operation of both power plants to complete the cycle

  2. Remote-handling demonstration tests for the Fusion Materials Irradiation Test (FMIT) Facility

    International Nuclear Information System (INIS)

    Shen, E.J.; Hussey, M.W.; Kelly, V.P.; Yount, J.A.

    1982-01-01

    The mission of the Fusion Materials Irradiation Test (FMIT) Facility is to create a fusion-like environment for fusion materials development. Crucial to the success of FMIT is the development and testing of remote handling systems required to handle materials specimens and maintenance of the facility. The use of full scale mock-ups for demonstration tests provides the means for proving these systems

  3. Studies to demonstrate the adequacy of testing results of the qualification tests for the actuator of main steam safety relive valves (MSSRV) in an advanced boiling water reactor (ABWR)

    International Nuclear Information System (INIS)

    Gou, P.F.; Patel, R.; Curran, G.; Henrie, D.; Solorzano, E.

    2005-01-01

    This paper presents several studies performed to demonstrate that the testing results from the qualification tests for the actuator of the Main Steam Safety Relief Valves (MSSRV; also called SRV in this paper) in GE's Advanced Boiling Water Reactor (ABWR) are in compliance with the qualification guidelines stipulated in the applicable IEEE standards. The safety-related function of the MSSRV is to relieve pressure in order to protect the reactor pressure vessel from over-pressurization condition during normal operation and design basis events. In order to perform this function, the SRV must actuate at a given set pressure while maintaining the pressure and structural integrity of the SRV. The valves are provided with an electro-pneumatic actuator assembly that opens the valve upon receipt of an automatic or manually initiated electric signal to allow depressurization of the reactor pressure vessel (RPV). To assure the SRV can perform its intended safety related functions properly, qualification tests are needed in addition to analysis, to demonstrate that the SRV can withstand the specified environmental, dynamic and seismic design basis conditions without impairing its safety related function throughout their installed life under the design conditions including postulated design basis events such as OBE loads and Faulted (SSE) events. The guidelines used for the test methods, procedures and acceptance criteria for the qualification tests are established in IEEE std 344-1987 and IEEE std 382-1985. In the qualification tests, the specimen consists of the actuator, control valve assembly, limit switches, and limit switch support structure. During the functional, dynamic and seismic tests, the test specimen was mounted on a SRV. Qualification of safety related equipment to meet the guidelines of the IEEE standards is typically a two-step process: 1) environmental aging and 2) design basis events qualification. The purpose of the first step is to put the equipment in an

  4. Downtown People Mover (DPM) Winterization Test Demonstration : Otis Elevator

    Science.gov (United States)

    1982-01-01

    The Otis Elevator Company Transportation Technology Division (OTIS-TTD) Downtown People Mover (DPM) Winterization Test Demonstration Final Report covers the 1978-79 and 1979-80 winter periods. Tests were performed at the Otis test track in Denver, Co...

  5. Partial-array test results in IFSMTF

    International Nuclear Information System (INIS)

    Lue, J.W.; Dresner, L.; Koizumi, K.; Lubell, M.S.; Luton, J.N.; Shen, S.S.; Zahn, G.R.; Zichy, J.A.

    1985-01-01

    Preliminary performance tests of two large superconducting magnets have been carried out in the International Fusion Superconducting Magnet Test Facility (IFSMTF). Each of the Japanese (JA) and General Dynamics/Convair (GD) coils was operated up to its full design current of 10.2 kA with the other serving as an adjacent background coil at 40% of design current. Cryostatic stability was demonstrated for both coils by noting recovery from a full half-turn (5 m) driven normal. A new pick-up coil compensation scheme was successfully used for the quench detection system. Each coil remained superconducting when the other was dumped. Unique instrumentation was used to measure changes in bore dimensions and displacement of the winding from the coil case. Agreement between structural analysis and measurement of bore dimension changes resulting from magnetic loads is good. The Swiss (CH) coil underwent only a cryogenic test. The forced cooling worked well and an inlet temperature of 3.8 K was demonstrated

  6. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described

  7. Demonstration test results of organic materials' volumetric reduction using bio-ethanol, thermal decomposition and burning

    International Nuclear Information System (INIS)

    Tagawa, Akihiro; Watanabe, Masahisa

    2013-01-01

    To discover technologies that can be utilized for decontamination work and verify their effects, economic feasibility, safety, and other factors, the Ministry of the Environment launched the 'FY2011 Decontamination Technology Demonstrations Project' to publicly solicit decontamination technologies that would be verified in demonstration tests and adopted 22 candidates. JAEA was commissioned by the Ministry of the Environment to provide technical assistance related to these demonstrations. This paper describes the volume reduction due to bio-ethanol, thermal decomposition and burning of organic materials in this report. The purpose of this study is that to evaluate a technique that can be used as biomass energy source, while performing volume reduction of contamination organic matter generated by decontamination. An important point of volume reduction technology of contaminated organic matter, is to evaluate the mass balance in the system. Then, confirming the mass balance of radioactive material and where to stay is important. The things that are common to all technologies, are ensuring that the radioactive cesium is not released as exhaust gas, etc.. In addition, it evaluates the cost balance and energy balance in order to understand the applicability to the decontamination of volume reduction technology. The radioactive cesium remains in the carbides when organic materials are carbonized, and radioactive cesium does not transfer to bio-ethanol when organic materials are processed for bio-ethanol production. While plant operating costs are greater if radioactive materials need to be treated, if income is expected by business such as power generation, depreciation may be calculated over approximately 15 years. (authors)

  8. The Mammographic Head Demonstrator Developed in the Framework of the “IMI” Project:. First Imaging Tests Results

    Science.gov (United States)

    Bisogni, Maria Giuseppina

    2006-04-01

    In this paper we report on the performances and the first imaging test results of a digital mammographic demonstrator based on GaAs pixel detectors. The heart of this prototype is the X-ray detection unit, which is a GaAs pixel sensor read-out by the PCC/MEDIPIXI circuit. Since the active area of the sensor is 1 cm2, 18 detectors have been organized in two staggered rows of nine chips each. To cover the typical mammographic format (18 × 24 cm2) a linear scanning is performed by means of a stepper motor. The system is integrated in mammographic equipment comprehending the X-ray tube, the bias and data acquisition systems and the PC-based control system. The prototype has been developed in the framework of the integrated Mammographic Imaging (IMI) project, an industrial research activity aiming to develop innovative instrumentation for morphologic and functional imaging. The project has been supported by the Italian Ministry of Education, University and Research (MIUR) and by five Italian High Tech companies in collaboration with the universities of Ferrara, Roma “La Sapienza”, Pisa and the INFN.

  9. Boeing's STAR-FODB test results

    Science.gov (United States)

    Fritz, Martin E.; de la Chapelle, Michael; Van Ausdal, Arthur W.

    1995-05-01

    Boeing has successfully concluded a 2 1/2 year, two phase developmental contract for the STAR-Fiber Optic Data Bus (FODB) that is intended for future space-based applications. The first phase included system analysis, trade studies, behavior modeling, and architecture and protocal selection. During this phase we selected AS4074 Linear Token Passing Bus (LTPB) protocol operating at 200 Mbps, along with the passive, star-coupled fiber media. The second phase involved design, build, integration, and performance and environmental test of brassboard hardware. The resulting brassboard hardware successfully passed performance testing, providing 200 Mbps operation with a 32 X 32 star-coupled medium. This hardware is suitable for a spaceflight experiment to validate ground testing and analysis and to demonstrate performace in the intended environment. The fiber bus interface unit (FBIU) is a multichip module containing transceiver, protocol, and data formatting chips, buffer memory, and a station management controller. The FBIU has been designed for low power, high reliability, and radiation tolerance. Nine FBIUs were built and integrated with the fiber optic physical layer consisting of the fiber cable plant (FCP) and star coupler assembly (SCA). Performance and environmental testing, including radiation exposure, was performed on selected FBIUs and the physical layer. The integrated system was demonstrated with a full motion color video image transfer across the bus while simultaneously performing utility functions with a fiber bus control module (FBCM) over a telemetry and control (T&C) bus, in this case AS1773.

  10. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1987-01-01

    Describes two demonstrations to illustrate characteristics of substances. Outlines a method to detect the changes in pH levels during the electrolysis of water. Uses water pistols, one filled with methane gas and the other filled with water, to illustrate the differences in these two substances. (TW)

  11. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    International Nuclear Information System (INIS)

    Berglin, E.J.

    1997-01-01

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36'' diameter x 6' high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20' diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  12. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  13. Regulatory and extra-regulatory testing to demonstrate radioactive material packaging safety

    International Nuclear Information System (INIS)

    Ammerman, D.J.

    1997-01-01

    Packages for the transportation of radioactive material must meet performance criteria to assure safety and environmental protection. The stringency of the performance criteria is based on the degree of hazard of the material being transported. Type B packages are used for transporting large quantities of radioisotopes (in terms of A 2 quantities). These packages have the most stringent performance criteria. Material with less than an A 2 quantity are transported in Type A packages. These packages have less stringent performance criteria. Transportation of LSA and SCO materials must be in open-quotes strong-tightclose quotes packages. The performance requirements for the latter packages are even less stringent. All of these package types provide a high level of safety for the material being transported. In this paper, regulatory tests that are used to demonstrate this safety will be described. The responses of various packages to these tests will be shown. In addition, the response of packages to extra-regulatory tests will be discussed. The results of these tests will be used to demonstrate the high level of safety provided to workers, the public, and the environment by packages used for the transportation of radioactive material

  14. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L.

    1983-01-01

    An apparatus is described in which effects of pressure, volume, and temperature changes on a gas can be observed simultaneously. Includes use of the apparatus in demonstrating Boyle's, Gay-Lussac's, and Charles' Laws, attractive forces, Dalton's Law of Partial pressures, and in illustrating measurable vapor pressures of liquids and some solids.…

  15. Spent nuclear fuel integrity during dry storage - performance tests and demonstrations

    International Nuclear Information System (INIS)

    McKinnon, M.A.; Doherty, A.L.

    1997-06-01

    This report summarizes the results of fuel integrity surveillance determined from gas sampling during and after performance tests and demonstrations conducted from 1983 through 1996 by or in cooperation with the US DOE Office of Commercial Radioactive Waste Management (OCRWM). The cask performance tests were conducted at Idaho National Engineering Laboratory (INEL) between 1984 and 1991 and included visual observation and ultrasonic examination of the condition of the cladding, fuel rods, and fuel assembly hardware before dry storage and consolidation of fuel, and a qualitative determination of the effects of dry storage and fuel consolidation on fission gas release from the spent fuel rods. The performance tests consisted of 6 to 14 runs involving one or two loading, usually three backfill environments (helium, nitrogen, and vacuum backfills), and one or two storage system orientations. The nitrogen and helium backfills were sampled and analyzed to detect leaking spent fuel rods. At the end of each performance test, periodic gas sampling was conducted on each cask. A spent fuel behavior project (i.e., enhanced surveillance, monitoring, and gas sampling activities) was initiated by DOE in 1994 for intact fuel in a CASTOR V/21 cask and for consolidated fuel in a VSC-17 cask. The results of the gas sampling activities are included in this report. Information on spent fuel integrity is of interest in evaluating the impact of long-term dry storage on the behavior of spent fuel rods. Spent fuel used during cask performance tests at INEL offers significant opportunities for confirmation of the benign nature of long-term dry storage. Supporting cask demonstration included licensing and operation of an independent spent fuel storage installation (ISFSI) at the Virginia Power (VP) Surry reactor site. A CASTOR V/21, an MC-10, and a Nuclear Assurance NAC-I28 have been loaded and placed at the VP ISFSI as part of the demonstration program. 13 refs., 14 figs., 9 tabs

  16. Demonstration test for reliability of valves for atomic power plants

    International Nuclear Information System (INIS)

    Hosaka, Shiro

    1978-01-01

    The demonstration test on the reliability of valves for atomic power plants being carried out by the Nuclear Engineering Test Center is reported. This test series is conducted as six-year project from FY 1976 to FY 1981 at the Isogo Test Center. The demonstration test consists of (1) environmental test, (2) reaction force test, (3) vibration test, (4) stress measurement test, (5) operational characteristic test, (6) flow resistance coefficient measuring test, (7) leakage test and (8) safety valve and relief valve test. These contents are explained about the special requirements for nuclear use, for example, the enviornmental condition after the design base accident of PWRs and BWRs, the environmental test sequence for isolation valves of containment vessels under the emergency condition, the seismic test condition for valves of nuclear use, the various stress measurements under thermal transient conditions, the leak test after 500 cycles between the normal operating conditions for PWRs and BWRs and the start up conditions and so on. As for the testing facilities, the whole flow diagram is shown, in which the environmental test section, the vibration test section, the steam test section, the hot water test section, the safety valve test section and main components are included. The specifications of each test section and main components are presented. (Nakai, Y.)

  17. Demonstration poloidal coil test facility

    International Nuclear Information System (INIS)

    Sato, Masahiko; Kawano, Katumi; Tada, Eisuke

    1989-01-01

    A new compact cryogenic cold compressor was developed by Japan Atomic Energy Research Institute (JAERI) in collaboration with Isikawajima-Harima Heavy Industries Co., Ltd. (IHI) in order to produce the supercritical helium below 4.2 K for Demonstration Poloidal Coils (DPC) which are forced-flow cooled type superconducting pulse coils. This compressor is one of key components for DPC test facility. The cold compressor reduces pressure in liquid helium bath, which contains liquid helium of around 3,000 l, down to 0.5 atm efficiently. Consequently, supercritical helium down to 3.5 K is produced and supplied to the DPC coils. A centrifugal compressor with dynamic gas bearing is selected as a compressor mechanism to realize high adiabatic efficiency and large flow rate. In this performance tests, the compressor was operated for 220 h at saturated condition from 0.5 to 1.0 atm without any failure. High adiabatic efficiency (more than 60 %) is achieved with wide flow range (25-65 g/s) and the design value is fully satisfied. The compressor can rotate up to 80,000 rpm at maximum then the coil supply temperature of supercritical helium is 3.5 K. (author)

  18. A Fuzzy Logic Based Method for Analysing Test Results

    Directory of Open Access Journals (Sweden)

    Le Xuan Vinh

    2017-11-01

    Full Text Available Network operators must perform many tasks to ensure smooth operation of the network, such as planning, monitoring, etc. Among those tasks, regular testing of network performance, network errors and troubleshooting is very important. Meaningful test results will allow the operators to evaluate network performanceof any shortcomings and to better plan for network upgrade. Due to the diverse and mainly unquantifiable nature of network testing results, there is a needs to develop a method for systematically and rigorously analysing these results. In this paper, we present STAM (System Test-result Analysis Method which employs a bottom-up hierarchical processing approach using Fuzzy logic. STAM is capable of combining all test results into a quantitative description of the network performance in terms of network stability, the significance of various network erros, performance of each function blocks within the network. The validity of this method has been successfully demonstrated in assisting the testing of a VoIP system at the Research Instiute of Post and Telecoms in Vietnam. The paper is organized as follows. The first section gives an overview of fuzzy logic theory the concepts of which will be used in the development of STAM. The next section describes STAM. The last section, demonstrating STAM’s capability, presents a success story in which STAM is successfully applied.

  19. Test plan for the field evaluation and demonstration of the Contamination Control Unit

    International Nuclear Information System (INIS)

    Winberg, M.R.; Thompson, D.N.

    1993-06-01

    This report describes test details of a full demonstration of the Contamination Control Unit (CCU). The CCU is a mobile trailer capable of employing the use of soil fixatives, dust suppression agents, misting, and vacuum systems. These systems can perform a large number of contamination control functions to support the Office of Waste Technology Development (OTD) Buried Waste Integrated Demonstration (BWID) projects, transuranic (TRU) waste retrieval operations, and emergency response for hazardous and radioactive materials incidents. The demonstration will include both performance testing at the North Holmes Laboratory Facility (NHLF) and field testing in conjunction with the Remote Excavation System Demonstration at the Cold Test Pit. The NHLF will test operational parameters using water only, and the field demonstration at the Cold Test Pit involves full scale operation of vacuum, fixant, misting, and dust suppression systems. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the field demonstration are included in this test plan

  20. Reusable LH2 tank technology demonstration through ground test

    Science.gov (United States)

    Bianca, C.; Greenberg, H. S.; Johnson, S. E.

    1995-01-01

    The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.

  1. Phase 1 Development Testing of the Advanced Manufacturing Demonstrator Engine

    Science.gov (United States)

    Case, Nicholas L.; Eddleman, David E.; Calvert, Marty R.; Bullard, David B.; Martin, Michael A.; Wall, Thomas R.

    2016-01-01

    The Additive Manufacturing Development Breadboard Engine (BBE) is a pressure-fed liquid oxygen/pump-fed liquid hydrogen (LOX/LH2) expander cycle engine that was built and operated by NASA at Marshall Space Flight Center's East Test Area. The breadboard engine was conceived as a technology demonstrator for the additive manufacturing technologies for an advanced upper stage prototype engine. The components tested on the breadboard engine included an ablative chamber, injector, main fuel valve, turbine bypass valve, a main oxidizer valve, a mixer and the fuel turbopump. All parts minus the ablative chamber were additively manufactured. The BBE was successfully hot fire tested seven times. Data collected from the test series will be used for follow on demonstration tests with a liquid oxygen turbopump and a regeneratively cooled chamber and nozzle.

  2. Current status of the Demonstration Test of Underground Cavern-Type Disposal Facilities

    International Nuclear Information System (INIS)

    Akiyama, Yoshihiro; Terada, Kenji; Oda, Nobuaki; Yada, Tsutomu; Nakajima, Takahiro

    2011-01-01

    In Japan, the underground cavern-type disposal facilities for low-level waste (LLW) with relatively high radioactivity, mainly generated from power reactor decommissioning, and for certain transuranic (TRU) waste, mainly from spent fuel reprocessing, are designed to be constructed in a cavern 50-100 m underground and to employ an engineered barrier system (EBS) made of bentonite and cement materials. To advance a disposal feasibility study, the Japanese government commissioned the Demonstration Test of Underground Cavern-Type Disposal Facilities in fiscal year (FY) 2005. Construction of a full-scale mock-up test facility in an actual subsurface environment started in FY 2007. The main test objective is to establish the construction methodology and procedures that ensure the required quality of the EBS on-site. A portion of the facility was constructed by 2010, and the test has demonstrated both the practicability of the construction and the achievement of quality standards: low permeability of less than 5x10 -13 m/s and low-diffusion of less than 1x10 -12 m 2 /s at the completion of construction. This paper covers the test results from the construction of certain parts using bentonite and cement materials. (author)

  3. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  4. Round Robin Test for Performance Demonstration System of Ultrasound Examination Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Yang, Seung Han; Kim, Yong Sik; Yoon, Byung Sik; Lee, Hee Jong

    2005-01-01

    Ultrasound testing performance during in-service inspection for the main components of NPPs is strongly affected by each examination person. Therefore, ASME established a more strict qualification requirement in Sec. XI Appendix VIII for the ultrasound testing personnel in nuclear power plants. The Korean Performance Demonstration (KPD) System according to the ASME code for the ultrasonic testing personnel, equipments, and procedures to apply to the Class 1 and 2 piping ultrasound examination of nuclear power plants in Korea was established. And a round robin test was conducted in order to verify the effectiveness of PD method by comparing the examination results from the method of Performance Demonstration (PD) and a traditional ASME code dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, application of the PD method to the in-service inspection of the nuclear power plants will improve the performance of ultrasound testing

  5. Chinese nuclear heating test reactor and demonstration plant

    International Nuclear Information System (INIS)

    Wang Dazhong; Ma Changwen; Dong Duo; Lin Jiagui

    1992-01-01

    In this report the importance of nuclear district heating is discussed. From the viewpoint of environmental protection, uses of energy resources and transport, the development of nuclear heating in China is necessary. The development program of district nuclear heating in China is given in the report. At the time being, commissioning of the 5 MW Test Heating Reactor is going on. A 200 MWt Demonstration Plant will be built. In this report, the main characteristics of these reactors are given. It shows this type of reactor has a high inherent safety. Further the report points out that for this type of reactor the stability is very important. Some experimental results of the driving facility are included in the report. (orig.)

  6. The PANDA facility and first test results

    International Nuclear Information System (INIS)

    Dreier, J.; Huggenberger, M.; Aubert, C.; Bandurski, T.; Fischer, O.; Healzer, J.; Lomperski, S.; Strassberger, H.J.; Varadi, G.; Yadigaroglu, G.

    1996-01-01

    The PANDA test facility at the Paul Scherrer Institute is used to study the long-term performance of the Simplified Boiling Water Reactor's passive containment cooling system. The PANDA tests demonstrate performance on a larger scale than previous tests and examine the effects of any non-uniform spatial distributions of steam and non-condensable gases in the system. The facility is in 1:1 vertical scale and 1:25 scale for volume, power etc. Extensive facility characterization tests and steady-state passive containment condenser performance tests are presented. The results of the base case test of a series of transient system behaviour tests are reviewed. The first PANDA tests exhibited reproducibility, and indicated that the Simplified Boiling Water Reactor's containment is likely to be favorably responsive and highly robust to changes in the thermal transport patterns. (orig.) [de

  7. Demonstration testing and evaluation of in situ heating of soil

    International Nuclear Information System (INIS)

    1995-01-01

    This document describes the Quality Assurance Project Plan (QAPP) for IITRI Project C06787 entitled open-quotes Demonstration Testing and Evaluation of In Situ Heating of Soilclose quotes. A work plan for the above mentioned work was previously submitted. This QAPP describes the sampling and analysis of soil core-samples obtained from the K-25 Site (Oak Ridge Gaseous Diffusion Plant) where an in-situ heating and soil decontamination demonstration experiment will be performed. Soil samples taken before and after the experiment will be analyzed for selected volatile organic compounds. The Work Plan mentioned above provides a complete description of the demonstration site, the soil sampling plan, test plan, etc

  8. Radioactive Testing Results in Support of the In-Tank Precipitation Facility - Filtrate Test

    International Nuclear Information System (INIS)

    Hobbs, D.T.

    1998-01-01

    This report documents results investigating the decomposition of excess NaTPB in presence of filtrate from one of the Cycle I Demonstration tests, fulfilling a request by CST Engineering and the ITP Flow Sheet Team

  9. Beam Tests on the ATLAS Tile Calorimeter Demonstrator Module

    CERN Document Server

    Valdes Santurio, Eduardo; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) Phase II upgrade aims to increase the accelerator luminosity by a factor of 5-10. Due to the expected higher radiation levels and the aging of the current electronics, a new read-out system of the ATLAS experiment hadronic calorimeter (TileCal) is needed. A prototype of the electronics – the Demonstrator - has been tested exposing a module of the calorimeter to particles at the Super Proton Synchrotron (SPS) accelerator of CERN. Data were collected with beams of muons, electrons and hadrons and muons, at various incident energies and impact angles. The measurements aim to check the calibration and to determine the performance the detector exploiting the features of the interactions of the muons, electrons and hadrons with matter. We present the current status and results where the new Demonstrator new electronics were situated in calorimeter modules and exposed to beams of muons, electrons and hadrons with different energies and impact angles.

  10. Reliability demonstration test for load-sharing systems with exponential and Weibull components.

    Directory of Open Access Journals (Sweden)

    Jianyu Xu

    Full Text Available Conducting a Reliability Demonstration Test (RDT is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.

  11. Active vibration control testing of the SPICES program: final demonstration article

    Science.gov (United States)

    Dunne, James P.; Jacobs, Jack H.

    1996-05-01

    The Synthesis and Processing of Intelligent Cost Effective Structures (SPICES) Program is a partnership program sponsored by the Advanced Research Projects Agency. The mission of the program is to develop cost effective material processing and synthesis technologies to enable new products employing active vibration suppression and control devices to be brought to market. The two year program came to fruition in 1995 through the fabrication of the final smart components and testing of an active plate combined with two trapezoidal rails, forming an active mount. Testing of the SPICES combined active mount took place at McDonnell Douglas facilities in St. Louis, MO, in October-December 1995. Approximately 15 dB reduction in overall response of a motor mounted on the active structure was achieved. Further details and results of the SPICES combined active mount demonstration testing are outlined. Results of numerous damping and control strategies that were developed and employed in the testing are presented, as well as aspects of the design and fabrication of the SPICES active mount components.

  12. Demonstration test of underground cavern-type disposal facilities, fiscal 2010 status - 59180

    International Nuclear Information System (INIS)

    Akiyama, Yoshihiro; Terada, Kenji; Oda, Nobuaki; Yada, Tsutomu; Nakajima, Takahiro

    2012-01-01

    A test to demonstrate practical construction technology for underground cavern-type disposal facilities is currently underway. Cavern-type disposal facilities are a radioactive waste repository excavated to a depth of 50 to 100 m below ground and constructed with an engineered barrier system (EBS) that is a combination of low-permeable bentonite material and low-diffusive cementitious material. The disposed materials are low-level radioactive waste with relatively high radioactivity, mainly generated from power reactor decommissioning, and certain transuranic wastes that are mainly generated from spent fuel reprocessing. The project started in fiscal 2005*, and since fiscal 2007 a full-scale mock-up of a disposal facility has been constructed in an actual sub-surface environment. The main objective of the demonstration test is to establish construction procedures and methods which ensure the required quality of an EBS on-site. Certain component parts of the facility had been constructed in an underground cavern by fiscal 2010, and tests so far have demonstrated both the practicability of the construction and the achievement of the required quality. This paper covers the project outline and the test results obtained by the construction of certain EBS components. The following results were obtained from the construction test of EBS in the test cavern: 1) The dry density of bentonite buffer at the lower layer constructed by vibratory compaction shows that 95% of core samples have densities within the target range. 2) The specified mix for the low-diffusion layer has uniform density and crack-control properties, and meets the requirements for diffusion performance. 3) The specified mix of the concrete pit has sufficient passing ability through congested reinforcement and meets the requirements of strength performance. 4) The dry density of the bentonite buffer at the lateral layer constructed by the spraying method shows that 65% of the core samples are within the

  13. Magnetic Launch Assist System Demonstration Test

    Science.gov (United States)

    2001-01-01

    Engineers at the Marshall Space Flight Center (MSFC) have been testing Magnetic Launch Assist Systems, formerly known as Magnetic Levitation (MagLev) technologies. To launch spacecraft into orbit, a Magnetic Launch Assist system would use magnetic fields to levitate and accelerate a vehicle along a track at a very high speed. Similar to high-speed trains and roller coasters that use high-strength magnets to lift and propel a vehicle a couple of inches above a guideway, the launch-assist system would electromagnetically drive a space vehicle along the track. A full-scale, operational track would be about 1.5-miles long and capable of accelerating a vehicle to 600 mph in 9.5 seconds. This photograph shows a subscale model of an airplane running on the experimental track at MSFC during the demonstration test. This track is an advanced linear induction motor. Induction motors are common in fans, power drills, and sewing machines. Instead of spinning in a circular motion to turn a shaft or gears, a linear induction motor produces thrust in a straight line. Mounted on concrete pedestals, the track is 100-feet long, about 2-feet wide, and about 1.5- feet high. The major advantages of launch assist for NASA launch vehicles is that it reduces the weight of the take-off, the landing gear, the wing size, and less propellant resulting in significant cost savings. The US Navy and the British MOD (Ministry of Defense) are planning to use magnetic launch assist for their next generation aircraft carriers as the aircraft launch system. The US Army is considering using this technology for launching target drones for anti-aircraft training.

  14. Advanced Demonstration and Test Reactor Options Study

    Energy Technology Data Exchange (ETDEWEB)

    Petti, David Andrew [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hill, R. [Argonne National Lab. (ANL), Argonne, IL (United States); Gehin, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gougar, Hans David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Strydom, Gerhard [Idaho National Lab. (INL), Idaho Falls, ID (United States); Heidet, F. [Argonne National Lab. (ANL), Argonne, IL (United States); Kinsey, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States); Qualls, A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Brown, Nicholas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Powers, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hoffman, E. [Argonne National Lab. (ANL), Argonne, IL (United States); Croson, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-01-01

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy

  15. Advanced Demonstration and Test Reactor Options Study

    International Nuclear Information System (INIS)

    Petti, David Andrew; Hill, R.; Gehin, J.; Gougar, Hans David; Strydom, Gerhard; Heidet, F.; Kinsey, J.; Grandy, Christopher; Qualls, A.; Brown, Nicholas; Powers, J.; Hoffman, E.; Croson, D.

    2017-01-01

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power's share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy's (DOE's) broader commitment to pursuing an 'all of the above' clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate 'advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy'. Advanced reactors are

  16. Test Objectives for the Saltcake Dissolution Retrieval Demonstration

    International Nuclear Information System (INIS)

    DEFIGH PRICE, C.

    2000-01-01

    This document describes the objectives the Saltcake Dissolution Retrieval Demonstration. The near term strategy for single-shell tank waste retrieval activities has shifted from focusing on maximizing the number of tanks entered for retrieval (regardless of waste volume or content) to a focus on scheduling the retrieval of wastes from those single-shell tanks with a high volume of contaminants of concern. These contaminants are defined as mobile, long-lived radionuclides that have a potential of reaching the groundwater and the Columbia River. This strategy also focuses on the performance of key retrieval technology demonstrations, including the Saltcake Dissolution Retrieval Demonstration, in a variety of waste forms and tank farm locations to establish a technical basis for future work. The work scope will also focus on the performance of risk assessment, retrieval performance evaluations (RPE) and incorporating vadose zone characterization data on a tank-by-tank basis, and on updating tank farm closure/post closure work plans. The deployment of a retrieval technology other than Past-Practice Sluicing (PPS) allows determination of limits of technical capabilities, as well as, providing a solid planning basis for future SST retrievals. This saltcake dissolution technology deployment test will determine if saltcake dissolution is a viable retrieval option for SST retrieval. CH2M Hill Hanford Group (CHG) recognizes the SST retrieval mission is key to the success of the River Protection Project (RPP) and the overall completion of the Hanford Site cleanup. The objectives outlined in this document will be incorporated into and used to develop the test and evaluation plan for saltcake dissolution retrievals. The test and evaluation plan will be developed in fiscal year 2001

  17. Results of HHF tests and metallographic investigation of beryllium HHF mockups

    International Nuclear Information System (INIS)

    Giniaytulin, R.; Komarov, V.; Mazul, I.; Yablokov, N.; Watson, R.; Cadden, C.; Yang, N.

    2000-01-01

    The reliability of the beryllium-armoured elements for any fusion facilities strongly depends from the armour tile geometry and determines by the armour thickness and how it is castellated in the planar dimensions. The mockup with the tile dimensions of 5 x 5 x 5 mm demonstrated best results during the HHF tests at EBTS facility (SNLA). Thermal response test demonstrated the ultimate heat flux level fo 16.6 MW/m 2 without failure of the joint, melting of the beryllium surface limited the level of the heat flux. During thousand cycles by heat flux density of 13.5 MW/m 2 no damages in the Be/CuCrZr joint occurred that was approved by metallographic investigation of the tested and non-tested cross-sections. This paper presents the results of HHF testing with Be-armoured mockup that has optimized armour geometry, 2-D temperature analysis for testing conditions and the results of metallographic analysis. The results are discussed and the recommendations for armour dimensions are also made. (orig.)

  18. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Linton, Kory D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burns, Zachary M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examine postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.

  19. Demonstration tests for low level radioactive waste packaging safety

    International Nuclear Information System (INIS)

    Nagano, I.; Shimura, S.; Miki, T.; Tamamura, T.; Kunitomi, K.

    1993-01-01

    The transport packaging for low level radioactive waste (so-called the LLW packaging) has been developed to be utilized for transportation of LLW in 200 liter-drums from Japanese nuclear power stations to the LLW Disposal Center at Rokkashomura in Aomori Prefecture. Transportation is expected to start from December in 1992. We will explain the brief history of the development, technical features and specifications as well as two kinds of safety demonstration tests, namely one is '1.2 meter free drop test' and the other is 'ISO container standard test'. (J.P.N.)

  20. Uprated OMS Engine Status-Sea Level Testing Results

    Science.gov (United States)

    Bertolino, J. D.; Boyd, W. C.

    1990-01-01

    The current Space Shuttle Orbital Maneuvering Engine (OME) is pressure fed, utilizing storable propellants. Performance uprating of this engine, through the use of a gas generator driven turbopump to increase operating pressure, is being pursued by the NASA Johnson Space Center (JSC). Component level design, fabrication, and test activities for this engine system have been on-going since 1984. More recently, a complete engine designated the Integrated Component Test Bed (ICTB), was tested at sea level conditions by Aerojet. A description of the test hardware and results of the sea level test program are presented. These results, which include the test condition operating envelope and projected performance at altitude conditions, confirm the capability of the selected Uprated OME (UOME) configuration to meet or exceed performance and operational requirements. Engine flexibility, demonstrated through testing at two different operational mixture ratios, along with a summary of projected Space Shuttle performance enhancements using the UOME, are discussed. Planned future activities, including ICTB tests at simulated altitude conditions, and recommendations for further engine development, are also discussed.

  1. EFTF cobalt test assembly results

    International Nuclear Information System (INIS)

    Rawlins, J.A.; Wootan, D.W.; Carter, L.L.; Brager, H.R.; Schenter, R.E.

    1988-01-01

    A cobalt test assembly containing yttrium hydride pins for neutron moderation was irradiated in the Fast Flux Test Facility during Cycle 9A for 137.7 equivalent full power days at a power level fo 291 MW. The 36 test pins consisted of a batch of 32 pins containing cobalt metal to produce Co-60, and a set of 4 pins with europium oxide to produce Gd-153, a radioisotope used in detection of the bone disease Osteoporosis. Post-irradiation examination of the cobalt pins determined the Co-60 produced with an accuracy of about 5 %. The measured Co-60 spatially distributed concentrations were within 20 % of the calculated concentrations. The assembly average Co-60 measured activity was 4 % less than the calculated value. The europium oxide pins were gamma scanned for the europium isotopes Eu-152 and Eu-154 to an absolute accuracy of about 10 %. The measured europium radioisotpe anc Gd-153 concentrations were within 20 % of calculated values. In conclusion, the hydride assembly performed well and is an excellent vehicle for many Fast Flux Test Facility isotope production applications. The results also demonstrate that the calculational methods developed by the Westinghouse Hanford Company are very accurate. (author)

  2. In situ gas treatment technology demonstration test plan

    International Nuclear Information System (INIS)

    Thornton, E.C.; Miller, R.D.

    1996-01-01

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities

  3. Critical joints in large composite primary aircraft structures. Volume 2: Technology demonstration test report

    Science.gov (United States)

    Bunin, Bruce L.

    1985-01-01

    A program was conducted to develop the technology for critical structural joints in composite wing structure that meets all the design requirements of a 1990 commercial transport aircraft. The results of four large composite multirow bolted joint tests are presented. The tests were conducted to demonstrate the technology for critical joints in highly loaded composite structure and to verify the analytical methods that were developed throughout the program. The test consisted of a wing skin-stringer transition specimen representing a stringer runout and skin splice on the wing lower surface at the side of the fuselage attachment. All tests were static tension tests. The composite material was Toray T-300 fiber with Ciba-Geigy 914 resin in 10 mil tape form. The splice members were metallic, using combinations of aluminum and titanium. Discussions are given of the test article, instrumentation, test setup, test procedures, and test results for each of the four specimens. Some of the analytical predictions are also included.

  4. The Pixel-TPC. Demonstration of the concept and results

    Energy Technology Data Exchange (ETDEWEB)

    Lupberger, Michael [Universitaet Bonn (Germany); Collaboration: LCTPC-Deutschland-Collaboration

    2016-07-01

    A Time Projection Chamber (TPC) is foreseen as tracker for the ILD, one of the two detector concepts at the planned International Linear Collider (ILC). At the TPC endplates, Micromegas or GEMs will be used as gas amplification structure. Besides segmented anodes, also an active endplate with pixel chips, in our experiments the Timepix ASIC, is considered as a readout option. In a photolithographic process a grid has been produced on top of the chip to form a so called InGrid, which is a Micromegas-like gas amplification structure. Several thousand InGrids are necessary to equip a complete TPC endplate. For demonstration of the concept, three endplate modules have been built with a total of 160 InGrids covering an active area of about 300 cm{sup 2}. To read out the 10.5 million channels, the Timepix ASIC was implemented in a general readout system. A dedicated powering scheme, DAQ and online event display were developed by our group. The feasibility of the Pixel-TPC could be proven in a test beam campaign at DESY early 2015. The data has partly been analysed and shows the potential of this new type of detector. An overview of the developments necessary to build the detector is presented followed by impressions from the test beam and some of the results from the data analysis.

  5. Results from the CLIC Test Facility

    CERN Document Server

    Braun, H; Bossart, Rudolf; Chautard, F; Corsini, R; Delahaye, J P; Godot, J C; Hutchins, S; Kamber, I; Madsen, J H B; Rinolfi, Louis; Rossat, G; Schreiber, S; Suberlucq, Guy; Thorndahl, L; Wilson, Ian H; Wuensch, Walter

    1996-01-01

    In order to study the principle of the Compact Linear Collider (CLIC) based on the Two Beam Acceleration (TBA) scheme at high frequency, a CLIC Test Facility (CTF) has been set-up at CERN. After four years of successful running, the experimental programme is now fully completed and all its objectives reached, particularly the generation of a high intensity drive beam with short bunches by a photo-injector, the production of 30 GHz RF power and the acceleration of a probe beam by 30 GHz structures. A summary of the CTF results and their impact on linear collider design is given. This covers 30 GHz high power testing, study of intense, short single bunches; as well as RF-Gun, photocathode and beam diagnostic developments. A second phase of the test facility (CTF2) is presently being installed to demonstrate the feasibility of the TBA scheme by constructing a fully engineered, 10 m long, test section very similar to the CLIC drive and main linacs, producing up to 480 MW of peak RF power at 30 GHz and acceleratin...

  6. Integrated leak rate test results of JOYO reactor containment vessel

    International Nuclear Information System (INIS)

    Tamura, M.; Endo, J.

    1982-02-01

    Integrated leak rate tests of JOYO after the reactor coolant system had been filled with sodium have been performed two times since 1978 (February 1978 and December 1979). The tests were conducted with the in-containment sodium systems, primary argon cover gas system and air conditioning systems operating. Both the absolute pressure method and the reference chamber method were employed during the test. The results of both tests confirmed the functioning of the containment vessel, and leak rate limits were satisfied. In Addition, the adequancy of the test instrumentation system and the test method was demonstrated. Finally the plant conditions required to maintain reasonable accuracy for the leak rate testing of LMFBR were established. In this paper, the test conditions and the test results are described. (author)

  7. Coupling solar photo-Fenton and biotreatment at industrial scale: Main results of a demonstration plant

    International Nuclear Information System (INIS)

    Malato, Sixto; Blanco, Julian; Maldonado, Manuel I.; Oller, Isabel; Gernjak, Wolfgang; Perez-Estrada, Leonidas

    2007-01-01

    This paper reports on the combined solar photo-Fenton/biological treatment of an industrial effluent (initial total organic carbon, TOC, around 500 mg L -1 ) containing a non-biodegradable organic substance (α-methylphenylglycine at 500 mg L -1 ), focusing on pilot plant tests performed for design of an industrial plant, the design itself and the plant layout. Pilot plant tests have demonstrated that biodegradability enhancement is closely related to disappearance of the parent compound, for which a certain illumination time and hydrogen peroxide consumption are required, working at pH 2.8 and adding Fe 2+ = 20 mg L -1 . Based on pilot plant results, an industrial plant with 100 m 2 of CPC collectors for a 250 L/h treatment capacity has been designed. The solar system discharges the wastewater (WW) pre-treated by photo-Fenton into a biotreatment based on an immobilized biomass reactor. First, results of the industrial plant are also presented, demonstrating that it is able to treat up to 500 L h -1 at an average solar ultraviolet radiation of 22.9 W m -2 , under the same conditions (pH, hydrogen peroxide consumption) tested in the pilot plant

  8. Test Results for CSTR Test 4

    International Nuclear Information System (INIS)

    Lee, D.D.

    2001-01-01

    One of the 3 technologies currently being developed for the Savannah River Salt Waste Processing Program is the Small-Tank Tetraphenylborate Process (STTP). This process uses sodium tetraphenylborate to precipitate and remove radioactive Cs from the waste and monosodium titanate to sorb and remove radioactive Sr and actinides. ORNL is demonstrating this process at the 1:4000 scale using a 20-liter continuous-flow stirred tank reactor (CSTR) system. The primary goal of Test 4 was to verify that the STTP process could achieve and maintain the necessary Cs decontamination while TPB was actively decomposing. Even with TPB being decomposed by the off-normal conditions of this test, the decontaimination factor for 137 Cs obtained for the filtrate from the Slurry Concentrating Tank ranged from 47,000 to 646,000, exceeding the WAC standard

  9. Development, testing, and demonstration of an optimal fine coal cleaning circuit

    International Nuclear Information System (INIS)

    Mishra, M.; Placha, M.; Bethell, P.

    1995-01-01

    The overall objective of this project is to improve the efficiency of fine coal cleaning. The project will be completed in two phases: bench-scale testing and demonstration of four advanced flotation cells and; in-plant proof-of-concept (POC) pilot plant testing of two flotation cells individually and in two-stage combinations. The goal is to ascertain if a two-stage circuit can result in reduced capital and operating costs while achieving improved separation efficiency. The plant selected for this project, Cyprus Emerald Coal Preparation plant, cleans 1200 tph of raw coal. The plant produces approximately 4 million tonnes of clean coal per year at an average as received energy content of 30.2 MJ/Kg (13,000 Btu/lb)

  10. Development, testing, and demonstration of an optimal fine coal cleaning circuit

    Energy Technology Data Exchange (ETDEWEB)

    Mishra, M.; Placha, M.; Bethell, P. [and others

    1995-11-01

    The overall objective of this project is to improve the efficiency of fine coal cleaning. The project will be completed in two phases: bench-scale testing and demonstration of four advanced flotation cells and; in-plant proof-of-concept (POC) pilot plant testing of two flotation cells individually and in two-stage combinations. The goal is to ascertain if a two-stage circuit can result in reduced capital and operating costs while achieving improved separation efficiency. The plant selected for this project, Cyprus Emerald Coal Preparation plant, cleans 1200 tph of raw coal. The plant produces approximately 4 million tonnes of clean coal per year at an average as received energy content of 30.2 MJ/Kg (13,000 Btu/lb).

  11. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  12. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  13. LWR aerosol containment experiments (LACE) program and initial test results

    International Nuclear Information System (INIS)

    Muhlestein, L.D.; Hilliard, R.K.; Bloom, G.R.; McCormack, J.D.; Rahn, F.J.

    1985-01-01

    The LWR aerosol containment experiments (LACE) program is described. The LACE program is being performed at the Hanford Engineer Development Laboratory (operated by Westinghouse Hanford Company) and the initial tests are sponsored by EPRI. The objectives of the LACE program are: to demonstrate, at large-scale, inherent radioactive aerosol retention behavior for postulated high consequence LWR accident situations; and to provide a data base to be used for aerosol behavior . Test results from the first phase of the LACE program are presented and discussed. Three large-scale scoping tests, simulating a containment bypass accident sequence, demonstrated the extent of agglomeration and deposition of aerosols occurring in the pipe pathway and vented auxiliary building under realistic accident conditions. Parameters varied during the scoping tests were aerosol type and steam condensation

  14. Reliability demonstration methodology for products with Gamma Process by optimal accelerated degradation testing

    International Nuclear Information System (INIS)

    Zhang, Chunhua; Lu, Xiang; Tan, Yuanyuan; Wang, Yashun

    2015-01-01

    For products with high reliability and long lifetime, accelerated degradation testing (ADT) may be adopted during product development phase to verify whether its reliability satisfies the predetermined level within feasible test duration. The actual degradation from engineering is usually a strictly monotonic process, such as fatigue crack growth, wear, and erosion. However, the method for reliability demonstration by ADT with monotonic degradation process has not been investigated so far. This paper proposes a reliability demonstration methodology by ADT for this kind of product. We first apply Gamma process to describe the monotonic degradation. Next, we present a reliability demonstration method by converting the required reliability level into allowable cumulative degradation in ADT and comparing the actual accumulative degradation with the allowable level. Further, we suggest an analytical optimal ADT design method for more efficient reliability demonstration by minimizing the asymptotic variance of decision variable in reliability demonstration under the constraints of sample size, test duration, test cost, and predetermined decision risks. The method is validated and illustrated with example on reliability demonstration of alloy product, and is applied to demonstrate the wear reliability within long service duration of spherical plain bearing in the end. - Highlights: • We present a reliability demonstration method by ADT for products with monotonic degradation process, which may be applied to verify reliability with long service life for products with monotonic degradation process within feasible test duration. • We suggest an analytical optimal ADT design method for more efficient reliability demonstration, which differs from the existed optimal ADT design for more accurate reliability estimation by different objective function and different constraints. • The methods are applied to demonstrate the wear reliability within long service duration of

  15. Technology of CCS coal utilization (outline of large-size demonstration test for CCS); CCS tan riyo gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Konno, K [Center for Coal Utilization, Japan, Tokyo (Japan); Hironaka, H [Idemitsu Kosan Co. Ltd., Tokyo (Japan)

    1996-09-01

    The coal cartridge system (CCS) is a series of the total system, in which coal is processed centrally at a supply base for each unit of consumer areas, supplied as pulverized coal in bulk units, and coal ash after combustion is recovered and treated. The system is expected of advantages resulted from the centralized production, elimination of handling troubles, and cleanliness. Following a small scale demonstration test, a large demonstration test for practically usable scale has begun in 1990, and completed in fiscal 1995. This paper introduces the CCS and reports the result of the test. In the large demonstration test, a supply station (with manufacturing capability of 200,000 tons a year) was installed in the Aichi refinery of Idemitsu Kosan Co., Ltd., and systematization on quality design and system technologies has been carried out. Long-term continuous operation for five years was achieved (operation time of the supply facilities was about 19,000 hours) without a failure and accident, to which every elemental technology was evaluated highly, and convenience and reliability of the system was verified. 13 figs., 3 tabs.

  16. Commissioning and First Results from the Fermilab Cryomodule Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Harms, Elvin; et al.

    2017-05-01

    A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

  17. Beam Tests on the ATLAS Tile Calorimeter Demonstrator Module

    CERN Document Server

    Valdes Santurio, Eduardo; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) Phase II upgrade aims to increase the accelerator luminosity by a factor of 5-10. Due to the expected higher radiation levels and the aging of the current electronics, a new readout system of the ATLAS experiment hadronic calorimeter (TileCal) is needed. A prototype of the electronics – the Demonstrator - has been tested exposing a module of the calorimeter to particles at the Super Proton Synchrotron (SPS) accelerator of CERN. Data were collected with beams of muons, electrons and hadrons and muons, at various incident energies and impact angles. The measurements aim to check the calibration and to determine the performance the detector exploiting the features of the interactions of the muons, electrons and hadrons with matter. The results of the ongoing data analysis are discussed in the presentation.

  18. Buffer Construction Methodology in Demonstration Test For Cavern Type Disposal Facility

    International Nuclear Information System (INIS)

    Yoshihiro, Akiyama; Takahiro, Nakajima; Katsuhide, Matsumura; Kenji, Terada; Takao, Tsuboya; Kazuhiro, Onuma; Tadafumi, Fujiwara

    2009-01-01

    A number of studies concerning a cavern type disposal facility have been carried out for disposal of low level radioactive waste mainly generated by power plant decommissioning in Japan. The disposal facility is composed of an engineered barrier system with concrete pit and bentonite buffer, and planed to be constructed in sub-surface 50 - 100 meters depth. Though the previous studies have mainly used laboratory and mock-up tests, we conducted a demonstration test in a full-size cavern. The main objectives of the test were to study the construction methodology and to confirm the quality of the engineered barrier system. The demonstration test was planned as the construction of full scale mock-up. It was focused on a buffer construction test to evaluate the construction methodology and quality control in this paper. Bentonite material was compacted to 1.6 Mg/m 3 in-site by large vibrating roller in this test. Through the construction of the buffer part, a 1.6 Mg/m 3 of the density was accomplished, and the data of workability and quality is collected. (authors)

  19. Hanford tanks initiative - test implementation plan for demonstration of in-tank retrieval technology

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This document presents a Systems Engineering approach for performing the series of tests associated with demonstrating in-tank retrieval technologies. The testing ranges from cold testing of individual components at the vendor's facility to the final fully integrated demonstration of the retrieval system's ability to remove hard heel high-level waste from the bottom of a Hanford single-shell tank

  20. Hermod: optical payload technology demonstrator flying on PROBA-V: overview of the payload development, testing and results after 1 year in orbit exploitation

    Science.gov (United States)

    Hernandez, S.; Blasco, J.; Henriksen, V.; Samuelsson, H.; Navasquillo, O.; Grimsgaard, M.; Mellab, K.

    2017-11-01

    and environmental tests before the integration in a very limited time. The telemetry data is currently sent to ground on daily basis. All the channels have survived the launch and no BER has been measured with the exception of channel 2, currently recording a BER of 3.06*10-16, that exhibits from time to time a burst of errors due to synchronizing issues of the initial data frame. It is expected to observe during the operating life of the payload the first errors within the channel 4 which was designed on purpose with reduced power margin. This paper will present the full overview of the HERMOD technology demonstrator including the development, testing, validation activity, integration, commissioning and 1 year in-orbit exploitation results.

  1. COMPARISON OF RESULTS OF THERMAL TESTS OF BALCONY DOORS

    Directory of Open Access Journals (Sweden)

    Golubev Stanislav Sergeevich

    2012-10-01

    Full Text Available Results of thermal tests of balcony doors are presented in the article. In the course of the research project, two types of doors were tested. The first type represents a PVC frame door (width 82 mm; it has a triple glazing (4K-16Ar-4-16Ar-K4; its blank part represents a polystyrene sandwich panel (width 40 mm. The second type represents a PVC frame door (width 82 mm, that has a triple glazing (4K-16Ar-4-16Ar-K4 and composite PVC panels. The testing procedure and processing results are described in the article. The test has demonstrated that the thermal resistance value of the balcony door of the first type exceeds the thermal resistance value of the balcony door of the second type.

  2. Runway Incursion Prevention System: Demonstration and Testing at the Dallas/Fort Worth International Airport

    Science.gov (United States)

    Jones, Denise R.; Quach, Cuong C.; Young, Steven D.

    2007-01-01

    A Runway Incursion Prevention System (RIPS) was tested at the Dallas-Ft. Worth International Airport (DFW) in October 2000. The system integrated airborne and ground components to provide both pilots and controllers with enhanced situational awareness, supplemental guidance cues, a real-time display of traffic information, and warning of runway incursions in order to prevent runway incidents while also improving operational capability. A series of test runs was conducted using NASA s Boeing 757 research aircraft and a test van equipped to emulate an incurring aircraft. The system was also demonstrated to over 100 visitors from the aviation community. This paper gives an overview of the RIPS, DFW flight test activities, and quantitative and qualitative results of the testing.

  3. Feasibility study using hypothesis testing to demonstrate containment of radionuclides within waste packages

    International Nuclear Information System (INIS)

    Thomas, R.E.

    1986-04-01

    The purpose of this report is to apply methods of statistical hypothesis testing to demonstrate the performance of containers of radioactive waste. The approach involves modeling the failure times of waste containers using Weibull distributions, making strong assumptions about the parameters. A specific objective is to apply methods of statistical hypothesis testing to determine the number of container tests that must be performed in order to control the probability of arriving at the wrong conclusions. An algorithm to determine the required number of containers to be tested with the acceptable number of failures is derived as a function of the distribution parameters, stated probabilities, and the desired waste containment life. Using a set of reference values for the input parameters, sample sizes of containers to be tested are calculated for demonstration purposes. These sample sizes are found to be excessively large, indicating that this hypothesis-testing framework does not provide a feasible approach for demonstrating satisfactory performance of waste packages for exceptionally long time periods

  4. Test plan for the remote conveyance and innovative end effector demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Rice, P.; Smith, A.M. [EG& G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration.

  5. Test plan for the remote conveyance and innovative end effector demonstration

    International Nuclear Information System (INIS)

    Rice, P.; Smith, A.M.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration

  6. 39 CFR 501.9 - Demonstration or test Postage Evidencing Systems.

    Science.gov (United States)

    2010-07-01

    ... replicates a postage indicium for which the Postal Service has not received payment for postage. The... and must be tracked by model number, serial number, and physical location. (3) A demonstration or test...

  7. RAVAN CubeSat Results: Technologies and Science Demonstrated On Orbit

    Science.gov (United States)

    Swartz, W. H.; Lorentz, S. R.; Huang, P. M.; Smith, A. W.; Yu, Y.; Briscoe, J. S.; Reilly, N.; Reilly, S.; Reynolds, E.; Carvo, J.; Wu, D.

    2017-12-01

    Elucidating Earth's energy budget is vital to understanding and predicting climate, particularly the small imbalance between the incident solar irradiance and Earth-leaving fluxes of total and solar-reflected energy. Accurately quantifying the spatial and temporal variation of Earth's outgoing energy from space is a challenge—one potentially rendered more tractable with the advent of multipoint measurements from small satellite or hosted payload constellations. The Radiometer Assessment using Vertically Aligned Nanotubes (RAVAN) 3U CubeSat, launched November 11, 2016, is a pathfinder for a constellation to measure the Earth's energy imbalance. The objective of RAVAN is to establish that compact, broadband radiometers absolutely calibrated to high accuracy can be built and operated in space for low cost. RAVAN demonstrates two key technologies: (1) vertically aligned carbon nanotubes as spectrally flat radiometer absorbers and (2) gallium phase-change cells for on-board calibration and degradation monitoring of RAVAN's radiometer sensors. We show on-orbit results, including calibrated irradiance measurements at both shortwave, solar-reflected wavelengths and in the thermal infrared. These results are compared with both modeled upwelling fluxes and those measured by independent Earth energy instruments in low-Earth orbit. Further, we show the performance of two gallium phase-change cells that are used to monitor the degradation of RAVAN's radiometer sensors. In addition to Earth energy budget technology and science, RAVAN also demonstrates partnering with a commercial vendor for the CubeSat bus, payload integration and test, and mission operations. We conclude with a discussion of how a RAVAN-type constellation could enable a breakthrough in the measurement of Earth's energy budget and lead to superior predictions of future climate.

  8. Final test report: demonstration testing in support of the Track 3system waste dislodging, retrieval and conveyance concepts

    International Nuclear Information System (INIS)

    Berglin, E.J.

    1997-01-01

    This report contains the quantitative and qualitative data and information collected during performance of the Track 3 System testing protocol. Information contained herein focuses on the data collected during performance of the following Tests Procedures. *Test Procedure-1, Position Management Test Procedure-2, Waste Dislodging, Retrieval, and Conveyance and Decontamination *Test Procedure-3, Dynamic Response Test procedures, Safety Demonstration

  9. Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    John G. Smart; Sera White; Michael Duoba

    2009-05-01

    Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energy’s (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

  10. JOYO modification program for demonstration tests of FBR innovative technology development

    International Nuclear Information System (INIS)

    Yoshimi, H.; Hachiya, Y.

    1990-01-01

    A plan is under way at PNC to modify the experimental fast reactor JOYO. The project is called MARK-III (MK-III) program. The purpose of MK-III is to expand the function of JOYO, and to make it possible to receive demonstration tests of new or high level technologies for FBR development. The MK-III program consists of two main modifications: conversion to a highly efficient irradiation facility; and a modification for demonstration testing of new technologies and concepts that have a high potential to reduce FBR plant construction cost, to evaluate plant reliability and to improve plant safety. These modifications are scheduled to start in 1991

  11. CCTF CORE I test results

    International Nuclear Information System (INIS)

    Murao, Yoshio; Sudoh, Takashi; Akimoto, Hajime; Iguchi, Tadashi; Sugimoto, Jun; Fujiki, Kazuo; Hirano, Kenmei

    1982-07-01

    This report presents the results of the following CCTF CORE I tests conducted in FY. 1980. (1) Multi-dimensional effect test, (2) Evaluation model test, (3) FLECHT coupling test. On the first test, one-dimensional treatment of the core thermohydrodynamics was discussed. On the second and third tests, the test results were compared with the results calculated by the evaluation model codes and the results of the corresponding FLECHT-SET test (Run 2714B), respectively. The work was performed under contracts with the Atomic Energy Bureau of Science and Technology Agency of Japan. (author)

  12. Safety demonstration tests of postulated solvent fire accidents in extraction process of a fuel reprocessing plant, (2)

    International Nuclear Information System (INIS)

    Tukamoto, Michio; Takada, Junichi; Koike, Tadao; Nishio, Gunji; Uno, Seiichiro; Kamoshida, Atsusi; Watanabe, Hironori; Hashimoto, Kazuichiro; Kitani, Susumu.

    1992-03-01

    Demonstration tests of hypothetical solvent fire in an extraction process of the reprocessing plant were carried out from 1984 to 1985 in JAERI, focusing on the confinement of radioactive materials during the fire by a large-scale fire facility (FFF) to evaluate the safety of air-ventilation system in the plant. Fire data from the demonstration test were obtained by focusing on fire behavior at cells and ducts in the ventilation system, smoke generation during the fire, transport and deposition of smoke containing simulated radioactive species in the ventilation system, confinement of radioactive materials, and integrity of HEPA filters by using the FFF simulating an air-ventilation system of the reference reprocessing plant in Japan. The present report is published in a series of the report Phase I (JAERI-M 91-145) of the demonstration test. Test results in the report will be used for the verification of a computer code FACE to evaluate the safety of postulated fire accidents in the reprocessing plant. (author)

  13. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  14. Demonstration of load rating capabilities through physical load testing : Sioux County bridge case study.

    Science.gov (United States)

    2013-08-01

    The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...

  15. Demonstration of load rating capabilities through physical load testing : Johnson County bridge case study.

    Science.gov (United States)

    2013-08-01

    The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...

  16. Demonstration of load rating capabilities through physical load testing : Ida County bridge case study.

    Science.gov (United States)

    2013-08-01

    The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...

  17. Results of the 1986 FFTF inherent safety tests

    International Nuclear Information System (INIS)

    Burke, T.M.; Campbell, L.R.; Franz, G.R.; Knecht, W.L.

    1987-01-01

    A series of tests was recently completed at the 400-MW (thermal) Fast Flux Test Facility (FFTF) to further demonstrate the passive safety characteristics of liquid-metal-cooled fast reactors. Earlier FFTF testing of decay heat removal by sodium natural circulation was reported in 1981. The main purpose of the 1986 test series was to demonstrate passive reactor shutdown during a loss-of-flow event when several inherent shutdown devices called gas expansion modules (GEMs) were installed in the reactor. However, these tests also provide further data on the natural circulation performance of the primary system, in particular the reactor core, and thus add to the data base available for checking the validity of available analytical tools

  18. School results and access test results as indicators of first-year performance at university

    Directory of Open Access Journals (Sweden)

    A Bothma

    2004-06-01

    Full Text Available The goals set by the National Plan for Higher Education, the fact that many schools are still severely disadvantaged as well as far-reaching changes in the school system demand that South African universities urgently reconsider their admission procedures. Redesigning admission procedures calls for a thorough understanding of the interrelationships between school marks, results in existing access tests and first-year university performance. These interrelationships were statistically investigated in the case of the 1999, 2000 and 2001 intake groups, who were compelled to write access tests before being admitted to Stellenbosch University. The results of this investigation confirm an alarming degree of unpreparedness among many prospective students regarding what is expected of them at university. This is aggravated by school marks creating a totally unrealistic expectation of performance in the first year at university. It is emphasised that schools and authorities dealing with admission of prospective students at universities should be cognisant of the findings reported here. Furthermore, the statistical analyses demonstrate several novel techniques for investigating the interrelationship between school marks, access test results and university performance.

  19. Development of Test-Analysis Models (TAM) for correlation of dynamic test and analysis results

    Science.gov (United States)

    Angelucci, Filippo; Javeed, Mehzad; Mcgowan, Paul

    1992-01-01

    The primary objective of structural analysis of aerospace applications is to obtain a verified finite element model (FEM). The verified FEM can be used for loads analysis, evaluate structural modifications, or design control systems. Verification of the FEM is generally obtained as the result of correlating test and FEM models. A test analysis model (TAM) is very useful in the correlation process. A TAM is essentially a FEM reduced to the size of the test model, which attempts to preserve the dynamic characteristics of the original FEM in the analysis range of interest. Numerous methods for generating TAMs have been developed in the literature. The major emphasis of this paper is a description of the procedures necessary for creation of the TAM and the correlation of the reduced models with the FEM or the test results. Herein, three methods are discussed, namely Guyan, Improved Reduced System (IRS), and Hybrid. Also included are the procedures for performing these analyses using MSC/NASTRAN. Finally, application of the TAM process is demonstrated with an experimental test configuration of a ten bay cantilevered truss structure.

  20. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  1. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    Science.gov (United States)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  2. Nonlinear Analysis and Preliminary Testing Results of a Hybrid Wing Body Center Section Test Article

    Science.gov (United States)

    Przekop, Adam; Jegley, Dawn C.; Rouse, Marshall; Lovejoy, Andrew E.; Wu, Hsi-Yung T.

    2015-01-01

    A large test article was recently designed, analyzed, fabricated, and successfully tested up to the representative design ultimate loads to demonstrate that stiffened composite panels with through-the-thickness reinforcement are a viable option for the next generation large transport category aircraft, including non-conventional configurations such as the hybrid wing body. This paper focuses on finite element analysis and test data correlation of the hybrid wing body center section test article under mechanical, pressure and combined load conditions. Good agreement between predictive nonlinear finite element analysis and test data is found. Results indicate that a geometrically nonlinear analysis is needed to accurately capture the behavior of the non-circular pressurized and highly-stressed structure when the design approach permits local buckling.

  3. Pipe rupture test results; 6 in. pipe whip test under BWR LOCA conditions

    International Nuclear Information System (INIS)

    Kurihara, Ryoichi; Yano, Toshikazu; Ueda, Shuzo; Isozaki, Toshikuni; Miyazaki, Noriyuki; Kato, Rokuro; Miyazono, Shohachiro

    1983-02-01

    A series of pipe rupture tests has been performed in JAERI to demonstrate the safety of the primary coolant circuits in the event of pipe rupture, in nuclear power plants. The present report summarizes the results of 6 in. pipe whip tests (RUN 5605, 5606), under BWR LOCA conditions (285 0 C, 6.8 MPa), which were performed in August, 1981. The test pipe is made of Type 304 stainless steel and its outer diameter is 6 in. and its thickness is 11.1 mm. The restraints are made of Type 304 stainless steel and its diameter is 16.0 mm. Two restraints were set on the restraint support with clearance of 100 mm. Overhang length was varied as the parameter in these tests and was 300 mm or 700 mm. The following results are obtained. (1) The deformations of a pipe and restraints are limited effectively by shorter overhang length of 300. However, they become larger when the overhang length is 700 mm, and the pipe deforms especially at the setting point of restraints. (2) Velocity at the free end of pipe becomes about 30 m/sec just after the break. However, velocity at the setting point of restraint becomes about only 4 m/sec just after the break. (3) It seems from the comparison between the 4 in. tests and 6 in. tests that the maximum restraint force of 6 in. tests is about two times as large as that of 4 in. tests. (author)

  4. The CANopen Controller IP Core: Implementation, Synthesis and Test Results

    Science.gov (United States)

    Caramia, Maurizio; Bolognino, Luca; Montagna, Mario; Tosi, Pietro; Errico, Walter; Bigongiari, Franco; Furano, Gianluca

    2011-08-01

    This paper will describe the implementation and test results of the CANopen Controller IP Core (CCIPC) implemented by Thales Alenia Space and SITAEL Aerospace with the support of ESA in the frame of the EXOMARS Project. The CCIPC is a configurable VHDL implementation of the CANOPEN protocol [1]; it is foreseen to be used as CAN bus slave controller within the EXOMARS Entry Descending and Landing Demonstrato Module (EDM) and Rover Module. The CCIPC features, configuration capability, synthesis and test results will be described and the evidence of the state of maturity of this innovative IP core will be demonstrated.

  5. Draft plan for the Waste Isolation Pilot Plant test phase: Performance assessment and operations demonstration

    International Nuclear Information System (INIS)

    1989-04-01

    The mission of the Waste Isolation Pilot Plant (WIPP) Project is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) radioactive wastes resulting from United States defense programs. With the Construction Phase of the WIPP facility nearing completion, WIPP is ready to initiate the next phase in its development, the Test Phase. The purpose of the Test Phase is to collect the necessary scientific and operational data to support a determination whether to proceed to the Disposal Phase and thereby designate WIPP a demonstration facility for the disposal of TRU wastes. This decision to proceed to the Disposal Phase is scheduled for consideration by September 1994. Development of the WIPP facility is the responsibility of the United States Department of Energy (DOE), whose Albuquerque Operations Office has designated the WIPP Project Office as Project Manager. This document describes the two major programs to be conducted during the Test Phase of WIPP: (1) Performance Assessment for determination of compliance with the Environmental Protection Agency Standard and (2) Operations Demonstration for evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP facility. 42 refs., 38 figs., 14 tabs

  6. A prototype tap test imaging system: Initial field test results

    Science.gov (United States)

    Peters, J. J.; Barnard, D. J.; Hudelson, N. A.; Simpson, T. S.; Hsu, D. K.

    2000-05-01

    This paper describes a simple, field-worthy tap test imaging system that gives quantitative information about the size, shape, and severity of defects and damages. The system consists of an accelerometer, electronic circuits for conditioning the signal and measuring the impact duration, a laptop PC and data acquisition and processing software. The images are generated manually by tapping on a grid printed on a plastic sheet laid over the part's surface. A mechanized scanner is currently under development. The prototype has produced images for a variety of aircraft composite and metal honeycomb structures containing flaws, damages, and repairs. Images of the local contact stiffness, deduced from the impact duration using a spring model, revealed quantitatively the stiffness reduction due to flaws and damages, as well as the stiffness enhancement due to substructures. The system has been field tested on commercial and military aircraft as well as rotor blades and engine decks on helicopters. Field test results will be shown and the operation of the system will be demonstrated.—This material is based upon work supported by the Federal Aviation Administration under Contract #DTFA03-98-D-00008, Delivery Order No. IA016 and performed at Iowa State University's Center for NDE as part of the Center for Aviation Systems Reliability program.

  7. Reviews of the In-situ Demonstration Test of the Engineered Barrier System in Many Countries

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Minsoo; Choi, Heui Joo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Many nations considering the deep geologic disposal of HLW are now planning or executing in-situ demonstration experiments on their regional EBS (Engineering barrier system) at their deep underground research facilities. The main purpose of the in-situ EBS test is the experimental confirmation of its performance, and the prediction of its long-term evolution through the modeling of EBS based on the experimental data. Additionally, the engineering feasibility for the construction of an engineering barrier system can also be checked through full scale construction of an in-situ test. KAERI is currently preparing an in-situ test at a large 1/3 scale, called IN-DEBS (In-situ Demonstration of EBS) at KURT (KAERI Underground Research Tunnel) for the generic EBS suggested in A-KRS (Advanced KAERI Reference System), which was developed to treat the HLW from pyroprocessing. As the first step for the design of IN-DEBS, the foreign in-situ demonstrations of EBS were reviewed in this paper. The demonstration projects, which were completed or are still being executed in some countries such as Sweden, France, Finland, Canada, Belgium, Switzerland, Spain, and Japan, were surveyed and summarized. In particular, hardware constitutions such as the heating element or compact bentonite, and the experimental procedures, have focused more on reviews than on experimental results in this survey, since their hardware information is very important for the design of the IN-DEBS.

  8. Reviews of the In-situ Demonstration Test of the Engineered Barrier System in Many Countries

    International Nuclear Information System (INIS)

    Lee, Minsoo; Choi, Heui Joo

    2013-01-01

    Many nations considering the deep geologic disposal of HLW are now planning or executing in-situ demonstration experiments on their regional EBS (Engineering barrier system) at their deep underground research facilities. The main purpose of the in-situ EBS test is the experimental confirmation of its performance, and the prediction of its long-term evolution through the modeling of EBS based on the experimental data. Additionally, the engineering feasibility for the construction of an engineering barrier system can also be checked through full scale construction of an in-situ test. KAERI is currently preparing an in-situ test at a large 1/3 scale, called IN-DEBS (In-situ Demonstration of EBS) at KURT (KAERI Underground Research Tunnel) for the generic EBS suggested in A-KRS (Advanced KAERI Reference System), which was developed to treat the HLW from pyroprocessing. As the first step for the design of IN-DEBS, the foreign in-situ demonstrations of EBS were reviewed in this paper. The demonstration projects, which were completed or are still being executed in some countries such as Sweden, France, Finland, Canada, Belgium, Switzerland, Spain, and Japan, were surveyed and summarized. In particular, hardware constitutions such as the heating element or compact bentonite, and the experimental procedures, have focused more on reviews than on experimental results in this survey, since their hardware information is very important for the design of the IN-DEBS

  9. Testing, development and demonstration of large scale solar district heating systems

    DEFF Research Database (Denmark)

    Furbo, Simon; Fan, Jianhua; Perers, Bengt

    2015-01-01

    In 2013-2014 the project “Testing, development and demonstration of large scale solar district heating systems” was carried out within the Sino-Danish Renewable Energy Development Programme, the so called RED programme jointly developed by the Chinese and Danish governments. In the project Danish...... know how on solar heating plants and solar heating test technology have been transferred from Denmark to China, large solar heating systems have been promoted in China, test capabilities on solar collectors and large scale solar heating systems have been improved in China and Danish-Chinese cooperation...

  10. AZ-101 Mixer Pump Demonstration and Tests Data Management Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    DOUGLAS, D.G.

    2000-02-22

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  11. AZ-101 Mixer Pump Demonstration and Tests: Data Management (Analysis) Plan

    International Nuclear Information System (INIS)

    DOUGLAS, D.G.

    2000-01-01

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  12. Recent results on the RIA test in IGR reactor

    International Nuclear Information System (INIS)

    Asmolov, V.; Yegorova, L.

    1997-01-01

    At the 23d WRSM meeting the data base characterizing results of VVER high burnup fuel rods tests under reactivity-initiated accident (RIA) conditions was presented. Comparison of PWR and VVER failure thresholds was given also. Additional analysis of the obtained results was being carried out during 1996. The results of analysis show that the two different failure mechanisms were observed for PWR and VVER fuel rods. Some factors which can be as the possible reasons of these differences are presented. First of them is the state of preirradiated cladding. Published test data for PWR high burnup fuel rods demonstrated that the PWR high burnup fuel rods failed at the RIA test are characterized by very high level of oxidation and hydriding for the claddings. Corresponding researches were performed at Institute of Atomic Reactors (RLAR, Dimitrovgrad, Russia) for large set of VVER high burnup fuel rods. Results of these investigations show that preirradiated commercial Zr-1%Nb claddings practically keep their initial levels of oxidation and H 2 concentration. Consequently the VVER preirradiated cladding must keep the high level of mechanical properties. The second reason leading to differences between failure mechanisms for two types of high burnup fuel rods can be the test conditions. Now such kind of analysis have been performed by two methods

  13. Technical Bases to Consider for Performance and Demonstration Testing of Space Fission Reactors

    International Nuclear Information System (INIS)

    Hixson, Laurie L.; Houts, Michael G.; Clement, Steven D.

    2004-01-01

    Performance and demonstration testing are critical to the success of a space fission reactor program. However, the type and extent to which testing of space reactors should be performed has been a point of discussion within the industry for many years. With regard to full power ground nuclear tests, questions such as 'Do the benefits outweigh the risks? Are there equivalent alternatives? Can a test facility be constructed (or modified) in a reasonable amount of time? Will the test article accurately represent the flight system? Are the costs too restrictive?' have been debated for decades. There are obvious benefits of full power ground nuclear testing such as obtaining systems integrated reliability data on a full-scale, complete end-to-end system. But these benefits come at some programmatic risk. In addition, this type of testing does not address safety related issues. This paper will discuss and assess these and other technical considerations essential in deciding which type of performance and demonstration testing to conduct on space fission reactor systems. (authors)

  14. Demonstration and field trial of a resilient hybrid NG-PON test-bed

    Science.gov (United States)

    Prat, Josep; Polo, Victor; Schrenk, Bernhard; Lazaro, Jose A.; Bonada, Francesc; Lopez, Eduardo T.; Omella, Mireia; Saliou, Fabienne; Le, Quang T.; Chanclou, Philippe; Leino, Dmitri; Soila, Risto; Spirou, Spiros; Costa, Liliana; Teixeira, Antonio; Tosi-Beleffi, Giorgio M.; Klonidis, Dimitrios; Tomkos, Ioannis

    2014-10-01

    A multi-layer next generation PON prototype has been built and tested, to show the feasibility of extended hybrid DWDM/TDM-XGPON FTTH networks with resilient optically-integrated ring-trees architecture, supporting broadband multimedia services. It constitutes a transparent common platform for the coexistence of multiple operators sharing the optical infrastructure of the central metro ring, passively combining the access and the metropolitan network sections. It features 32 wavelength connections at 10 Gbps, up to 1000 users distributed in 16 independent resilient sub-PONs over 100 km. This paper summarizes the network operation, demonstration and field trial results.

  15. Out-of-pile demonstration test of hydrogen production system coupling with HTTR

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Nishihara, Tetsuo; Takeda, Tetsuaki; Hada, Kazuhiko; Hayashi, Koji

    1999-01-01

    In Japan Atomic Energy Research Institute, a hydrogen production system is being designed to produce hydrogen by means of a steam reforming process of natural gas using nuclear heat (10 MW, 905degC) supplied by the High Temperature Engineering Test Reactor (HTTR). The safety principle and criteria are also being investigated in the HTTR hydrogen production system. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile demonstration test was planned to confirm safety, controllability and performance of the steam reforming system under simulated operational conditions of the HTTR hydrogen production system. The out-of-pile test facility simulates key components downstream an intermediate heat exchanger of the HTTR hydrogen production system on a scale of 1 to 30 has a hydrogen production capacity of 110 Nm 3 /h using an electric heater as a reactor substitute. The test facility is under manufacturing aiming at completion in 2000 and followed by the test till 2004. In parallel to this, a hydrogen permeation test and a corrosion test of a catalyst tube of a steam reformer are being carried out to obtain data necessary for the design of the system. This report describes outline of the out-of-pile hydrogen production facility and demonstration test program for the HTTR hydrogen production system at present status. (author)

  16. Out-of-pile demonstration test of hydrogen production system coupling with HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Inagaki, Yoshiyuki; Nishihara, Tetsuo; Takeda, Tetsuaki; Hada, Kazuhiko; Hayashi, Koji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    1999-07-01

    In Japan Atomic Energy Research Institute, a hydrogen production system is being designed to produce hydrogen by means of a steam reforming process of natural gas using nuclear heat (10 MW, 905degC) supplied by the High Temperature Engineering Test Reactor (HTTR). The safety principle and criteria are also being investigated in the HTTR hydrogen production system. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile demonstration test was planned to confirm safety, controllability and performance of the steam reforming system under simulated operational conditions of the HTTR hydrogen production system. The out-of-pile test facility simulates key components downstream an intermediate heat exchanger of the HTTR hydrogen production system on a scale of 1 to 30 has a hydrogen production capacity of 110 Nm{sup 3}/h using an electric heater as a reactor substitute. The test facility is under manufacturing aiming at completion in 2000 and followed by the test till 2004. In parallel to this, a hydrogen permeation test and a corrosion test of a catalyst tube of a steam reformer are being carried out to obtain data necessary for the design of the system. This report describes outline of the out-of-pile hydrogen production facility and demonstration test program for the HTTR hydrogen production system at present status. (author)

  17. Chemical-Cleaning Demonstration Test No. 2 in a mock-up steam generator

    International Nuclear Information System (INIS)

    Jevec, J.M.; Leedy, W.S.

    1983-04-01

    This report describes the results of the mockup demonstration test of the first modified baseline process under Contract S-127, Chemical Cleaning of Nuclear Steam Generators. The objective of this program is to determine the feasibility of cleaning the secondary side of nuclear steam generators with state-of-the-art chemical cleaning technology. The first step was to benchmark a baseline process. This process was then modified to attempt to eliminate the causes of unacceptable cleaning performance. The modified baseline process consists of an EDTA/H 2 O 2 -based copper solvent and a near-neutral, EDTA/N 2 H 4 -based magnetite and crevice solvent. This report also presents the results of three inhibitor evaluation mockup runs used in the evaluation of the modified baseline process

  18. Demonstration of AC and DC charge control for the LISA test masses

    Science.gov (United States)

    Olatunde, Taiwo Janet

    2018-01-01

    Taiwo Olatunde, Stephen Apple, Andrew Chilton, Samantha Parry, Peter Wass, Guido Mueller, John W. Conklin The residual test mass acceleration in LISA must be below 3 fm/s2/√Hz at all frequencies between 0.1 and 3 mHz. Test mass charge coupled with stray electrical potentials and external electromagnetic fields is a well-known source of acceleration noise. LISA Pathfinder uses Hg lamps emitting mostly around 254 nm to discharge the test masses via photoemission, but a future LISA mission launched around 2030 will likely replace the lamps with newer UV LEDs with lower mass, better power efficiency, smaller size and higher bandwidth. This presentation will discuss charge control demonstrated on the torsion pendulum in AC and DC modes at the University of Florida using latest generation UV LEDs producing light at 240 nm with energy above the work function of pure Au. Initial results of Au quantum efficiency measurements (number of emitted electrons per incident photons) which is critical for bi-polar charge control will also be presented.

  19. Heat Pipe Powered Stirling Conversion for the Demonstration Using Flattop Fission (DUFF) Test

    Science.gov (United States)

    Gibson, Marc A.; Briggs, Maxwell H.; Sanzi, James L.; Brace, Michael H.

    2013-01-01

    Design concepts for small Fission Power Systems (FPS) have shown that heat pipe cooled reactors provide a passive, redundant, and lower mass option to transfer heat from the fuel to the power conversion system, as opposed to pumped loop designs typically associated with larger FPS. Although many systems have been conceptually designed and a few making it to electrically heated testing, none have been coupled to a real nuclear reactor. A demonstration test named DUFF Demonstration Using Flattop Fission, was planned by the Los Alamos National Lab (LANL) to use an existing criticality experiment named Flattop to provide the nuclear heat source. A team from the NASA Glenn Research Center designed, built, and tested a heat pipe and power conversion system to couple to Flattop with the end goal of making electrical power. This paper will focus on the design and testing performed in preparation for the DUFF test.

  20. Demonstration testing and evaluation of in situ soil heating

    International Nuclear Information System (INIS)

    Sresty, G.C.

    1994-01-01

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. The EM heating process for soil decontamination is based on volumetric heating technologies developed during the '70s for the recovery of fuels from shale and tar sands by IIT Research Institute (IITRI) under a co-operative program with the US Department of Energy (DOE). Additional modifications of the technology developed during the mid '80s are currently used for the production of heavy oil and waste treatment. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 to 95 C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern

  1. Integrated test plan for the field demonstration of the supported liquid membrane unit

    International Nuclear Information System (INIS)

    Dunks, K.L.; Hodgson, K.M.

    1995-06-01

    This Integrated Test Plan describes the operation and testing of a hybrid reverse osmosis (RO)/coupled transport (CT) groundwater remediation test unit, also referred to as the Environmental Restoration Technology Demonstrations at the Hanford Site. The SLM will be used to remove uranium, technetium-99, and nitrate from a selected groundwater source at the Hanford Site. The overall purpose of this test is to determine the efficiency of the RO/CT membranes operating in a hybrid unit, the ease of operating and maintaining the SLM, and the amount of secondary waste generated as a result of processing. The goal of the SLM is to develop a RO/CT process that will be applicable for removing contaminants from almost any contaminated water. This includes the effluents generated as part of the day-to-day operation of most any US Department of Energy (DOE) site. The removal of contaminants from the groundwaters before they reach the Columbia River or offsite extraction wells will reduce the risk that the population will be exposed to these compounds and will reduce the cost of subsequent groundwater cleanup

  2. Results from phase 2 of the radioiodine test facility experimental program

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J M; Kupferschmid, W C.H.; Wren, J C [Atomic Energy of Canada Ltd., Pinawa, MB (Canada). Whiteshell Labs.

    1996-12-01

    A series of intermediate-scale experiments were conducted in the Radioiodine Test Facility (RTF) in a vinyl-painted, zinc-primer coated, carbon steel vessel in order to assess the effects of vinyl surfaces on iodine volatility in both the presence and absence of radiation. This test series, Phase 2 of a larger, comprehensive program assessing a variety of containment surfaces, also examined the effects of organic (i.e., methyl ethyl ketone) and inorganic (i.e., hydrazine) additives, pH, and venting on the aqueous chemistry and volatility of solutions initially containing cesium iodide. These tests have clearly demonstrated that organics are released to the aqueous phase from the vinyl coating and that, under radiation conditions, these organics can have a significant effect on the formation of volatile iodine species. In particular, the RTF results suggest that radiolytic decomposition of the released organics results in dramatic reductions in pH and dissolved oxygen concentration, which in turn are responsible for increased formation of molecular iodine and organic iodides. When the pH was maintained at 10 (Test 3), much lower iodine volatility was observed; low iodine volatility was also observed in the absence of radiation. This test series also demonstrated that vinyl surfaces, particularly those in contact with the gas phase, were a sink for iodine. (author) 4 figs., 6 tabs., 17 refs.

  3. Results from phase 2 of the radioiodine test facility experimental program

    International Nuclear Information System (INIS)

    Ball, J.M.; Kupferschmid, W.C.H.; Wren, J.C.

    1996-01-01

    A series of intermediate-scale experiments were conducted in the Radioiodine Test Facility (RTF) in a vinyl-painted, zinc-primer coated, carbon steel vessel in order to assess the effects of vinyl surfaces on iodine volatility in both the presence and absence of radiation. This test series, Phase 2 of a larger, comprehensive program assessing a variety of containment surfaces, also examined the effects of organic (i.e., methyl ethyl ketone) and inorganic (i.e., hydrazine) additives, pH, and venting on the aqueous chemistry and volatility of solutions initially containing cesium iodide. These tests have clearly demonstrated that organics are released to the aqueous phase from the vinyl coating and that, under radiation conditions, these organics can have a significant effect on the formation of volatile iodine species. In particular, the RTF results suggest that radiolytic decomposition of the released organics results in dramatic reductions in pH and dissolved oxygen concentration, which in turn are responsible for increased formation of molecular iodine and organic iodides. When the pH was maintained at 10 (Test 3), much lower iodine volatility was observed; low iodine volatility was also observed in the absence of radiation. This test series also demonstrated that vinyl surfaces, particularly those in contact with the gas phase, were a sink for iodine. (author) 4 figs., 6 tabs., 17 refs

  4. Foster Wheeler Solar Development Corporation modular industrial solar retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandoski, A.A.

    1986-10-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  5. Foster Wheeler Solar Development Corporation Modular Industrial Solar Retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandowski, A.A.

    1987-04-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  6. Field test results for radioactive waste drum characterization with Waste Inspection Tomography (WIT)

    Energy Technology Data Exchange (ETDEWEB)

    Bernardi, R.T. [Bio-Imaging Research, Inc., Lincolnshire, IL (United States)

    1997-11-01

    This paper summarizes the design, fabrication, factory testing, evaluation and demonstration of waste inspection tomography (WIT). WIT consists of a self-sufficient, mobile semi-trailer for Non-Destructive Evaluation and Non-Destructive Assay (NDE/NDA) characterization of nuclear waste drums using X-ray and gamma-ray tomographic techniques. The 23-month WIT Phase I initial test results include 2 MeV Digital Radiography (DR), Computed Tomography (CT), Anger camera imaging, Single Photon Emission Computed Tomography (SPECT), Gamma-Ray Spectroscopy, Collimated Gamma Scanning (CGS), and Active and Passive Computed Tomography (A&PCT) using a 1.4 mCi source of {sup 166}Ho. These techniques were initially demonstrated on a 55-gallon phantom drum with three simulated waste matrices of combustibles, heterogeneous metals, and cement using check sources of gamma active isotopes. Waste matrix identification, isotopic identification, and attenuation-corrected gamma activity determination were all demonstrated nondestructively and noninvasively. Preliminary field tests results with nuclear waste drums are summarized. WIT has inspected drums with 0 to 20 grams plutonium 239. The minimum measured was 0.131 gram plutonium 239 in cement. 8 figs.

  7. Automated Testing Infrastructure and Result Comparison for Geodynamics Codes

    Science.gov (United States)

    Heien, E. M.; Kellogg, L. H.

    2013-12-01

    The geodynamics community uses a wide variety of codes on a wide variety of both software and hardware platforms to simulate geophysical phenomenon. These codes are generally variants of finite difference or finite element calculations involving Stokes flow or wave propagation. A significant problem is that codes of even low complexity will return different results depending on the platform due to slight differences in hardware, software, compiler, and libraries. Furthermore, changes to the codes during development may affect solutions in unexpected ways such that previously validated results are altered. The Computational Infrastructure for Geodynamics (CIG) is funded by the NSF to enhance the capabilities of the geodynamics community through software development. CIG has recently done extensive work in setting up an automated testing and result validation system based on the BaTLab system developed at the University of Wisconsin, Madison. This system uses 16 variants of Linux and Mac platforms on both 32 and 64-bit processors to test several CIG codes, and has also recently been extended to support testing on the XSEDE TACC (Texas Advanced Computing Center) Stampede cluster. In this work we overview the system design and demonstrate how automated testing and validation occurs and results are reported. We also examine several results from the system from different codes and discuss how changes in compilers and libraries affect the results. Finally we detail some result comparison tools for different types of output (scalar fields, velocity fields, seismogram data), and discuss within what margins different results can be considered equivalent.

  8. Construction and performance tests of Helium Engineering Demonstration Loop (HENDEL) for VHTR

    International Nuclear Information System (INIS)

    Hishida, M.; Tanaka, T.; Shimomura, H.; Sanokawa, K.

    1984-01-01

    A helium engineering demonstration loop (HENDEL) was constructed and operated in JAERI in order to develop the high-temperature key components of an experimental very high temperature gas cooled reactor, like fuel stack, in-core reactor structure, hot gas duct, intermediate heat exchanger. Performance tests as well as demonstration of integrity are carried out with large-size or actual-size models of key components. The key components to be tested in HENDEL are: fuel stack and control rod; core supporting structure, or bottom structure of rector core exposed to direct impingement of high temperature core outlet flow; reactor internal components and structure; high temperature components in heat removal system (primary and secondary cooling systems)

  9. PANDA passive decay heat removal transient test results

    International Nuclear Information System (INIS)

    Bandurski, Th.; Dreier, J.; Huggenberger, M.

    1997-01-01

    PANDA is a large scale facility for investigating the long-term decay heat removal from the containment of a next generation of 'passive' Advanced Light Water Reactors (ALWR). PANDA was used to examine the long-term LOCA response of the Passive Containment Cooling System (PCCS) for the General Electric (GE) Simplified Boiling Water Reactor (SBWR). The first PANDA test series had the dual objectives of demonstrating the performance of the SBWR PCCS and extending the data base available for containment analysis code qualification. The test objectives also include the study of the effects of mixing and stratification of steam and noncondensible gases in the drywell (DW) and in the suppression chamber or wetwell (WW). Ten tests were conducted in the course of the PANDA SBWR Program. The tests demonstrated a favorable and robust overall PCCS performance under different conditions. The present paper focuses on the main phenomena observed during the tests with respect to PCCS operation and DW gas mixing. (author)

  10. Wave Energy Research, Testing and Demonstration Center

    Energy Technology Data Exchange (ETDEWEB)

    Batten, Belinda [Oregon State Univ., Corvallis, OR (United States)

    2014-09-30

    The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar

  11. Attitude Operation Results of Solar Sail Demonstrator IKAROS

    Science.gov (United States)

    Saiki, Takanao; Tsuda, Yuichi; Funase, Ryu; Mimasu, Yuya; Shirasawa, Yoji; Ikaros Demonstration Team,

    This paper shows the attitude operation results of Japanese interplanetary solar sail demonstration spacecraft IKAROS. IKAROS was launched on 21 May 2010(JST) aboard an H-IIA rocket, together with the AKATSUKI Venus climate orbiter. As IKAROS is the secondary payload, the development cost and period were restricted and the onboard attitude system is very simple. This paper introduces the attitude determination and control system. And as IKAROS is spin type spacecraft and it has the large membrane, the attitude control is not easy and it is very important to determine the long-term attitude plan in advance. This paper also shows the outline of the IKAROS attitude operation plan and its operation results.

  12. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  13. 75 Ah and 10 boilerplate nickel-hydrogen battery designs and test results

    Science.gov (United States)

    Daman, M. E.; Manzo, Michelle A.; Chang, R.; Cruz, E.

    1992-01-01

    The results of initial characterization testing of 75 Ah actively cooled bipolar battery designs and 10 boilerplate nickel-hydrogen battery designs are presented. The results demonstrate the extended cycle life capability of the Ah batteries and the high capacity utilizations at various discharge rates of the nickel-hydrogen batteries.

  14. Ground Testing and Flight Demonstration of Charge Management of Insulated Test Masses Using UV LED Electron Photoemission

    OpenAIRE

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; AlRashed, Abdullah; Nassban, Badr Al; Suwaidan, Badr Al; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin

    2016-01-01

    The UV LED mission demonstrates the precise control of the potential of electrically isolated test masses that is essential for the operation of space accelerometers and drag free sensors. Accelerometers and drag free sensors were and remain at the core of geodesy, aeronomy, and precision navigation missions as well as gravitational science experiments and gravitational wave observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on G...

  15. 2014 ITS World Congress Connected Vehicle Test Bed Demonstration Traveler Situation Data

    Data.gov (United States)

    Department of Transportation — During the 2014 ITS World Congress a demonstration of the connected vehicle infrastructure in the City of Detroit was conducted. The test site included approximately...

  16. 2014 ITS World Congress Connected Vehicle Test Bed Demonstration Intersection Situation Data

    Data.gov (United States)

    Department of Transportation — During the 2014 ITS World Congress a demonstration of the connected vehicle infrastructure in the City of Detroit was conducted. The test site included approximately...

  17. Fault Sample Generation for Virtual Testability Demonstration Test Subject to Minimal Maintenance and Scheduled Replacement

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2015-01-01

    Full Text Available Virtual testability demonstration test brings new requirements to the fault sample generation. First, fault occurrence process is described by stochastic process theory. It is discussed that fault occurrence process subject to minimal repair is nonhomogeneous Poisson process (NHPP. Second, the interarrival time distribution function of the next fault event is proposed and three typical kinds of parameterized NHPP are discussed. Third, the procedure of fault sample generation is put forward with the assumptions of minimal maintenance and scheduled replacement. The fault modes and their occurrence time subject to specified conditions and time period can be obtained. Finally, an antenna driving subsystem in automatic pointing and tracking platform is taken as a case to illustrate the proposed method. Results indicate that both the size and structure of the fault samples generated by the proposed method are reasonable and effective. The proposed method can be applied to virtual testability demonstration test well.

  18. Last results of MADRAS, a space active optics demonstrator

    Science.gov (United States)

    Laslandes, Marie; Hourtoule, Claire; Hugot, Emmanuel; Ferrari, Marc; Devilliers, Christophe; Liotard, Arnaud; Lopez, Céline; Chazallet, Frédéric

    2017-11-01

    The goal of the MADRAS project (Mirror Active, Deformable and Regulated for Applications in Space) is to highlight the interest of Active Optics for the next generation of space telescope and instrumentation. Wave-front errors in future space telescopes will mainly come from thermal dilatation and zero gravity, inducing large lightweight primary mirrors deformation. To compensate for these effects, a 24 actuators, 100 mm diameter deformable mirror has been designed to be inserted in a pupil relay. Within the project, such a system has been optimized, integrated and experimentally characterized. The system is designed considering wave-front errors expected in 3m-class primary mirrors, and taking into account space constraints such as compactness, low weight, low power consumption and mechanical strength. Finite Element Analysis allowed an optimization of the system in order to reach a precision of correction better than 10 nm rms. A dedicated test-bed has been designed to fully characterize the integrated mirror performance in representative conditions. The test set up is made of three main parts: a telescope aberrations generator, a correction loop with the MADRAS mirror and a Shack-Hartman wave-front sensor, and PSF imaging. In addition, Fizeau interferometry monitors the optical surface shape. We have developed and characterized an active optics system with a limited number of actuators and a design fitting space requirements. All the conducted tests tend to demonstrate the efficiency of such a system for a real-time, in situ wave-front. It would allow a significant improvement for future space telescopes optical performance while relaxing the specifications on the others components.

  19. West Valley Demonstration Project vitrification process equipment Functional and Checkout Testing of Systems (FACTS)

    International Nuclear Information System (INIS)

    Carl, D.E.; Paul, J.; Foran, J.M.; Brooks, R.

    1990-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project was designed to convert stored radioactive waste into a stable glass for disposal in a federal repository. The Functional and Checkout Testing of Systems (FACTS) program was conducted from 1984 to 1989. During this time new equipment and processes were developed, installed, and implemented. Thirty-seven FACTS tests were conducted, and approximately 150,000 kg of glass were made by using nonradioactive materials to simulate the radioactive waste. By contrast, the planned radioactive operation is expected to produce approximately 500,000 kg of glass. The FACTS program demonstrated the effectiveness of equipment and procedures in the vitrification system, and the ability of the VF to produce quality glass on schedule. FACTS testing also provided data to validate the WVNS waste glass qualification method and verify that the product glass would meet federal repository acceptance requirements. The system was built and performed to standards which would have enabled it to be used in radioactive service. As a result, much of the VF tested, such as the civil construction, feed mixing and holding vessels, and the off-gas scrubber, will be converted for radioactive operation. The melter was still in good condition after being at temperature for fifty-eight of the sixty months of FACTS. However, the melter exceeded its recommended design life and will be replaced with a similar melter. Components that were not designed for remote operation and maintenance will be replaced with remote-use items. The FACTS testing was accomplished with no significant worker injury or environmental releases. During the last FACTS run, the VF processes approximated the remote-handling system that will be used in radioactive operations. Following this run the VF was disassembled for conversion to a radioactive process. Functional and checkout testing of new components will be performed prior to radioactive operation

  20. 40 CFR 63.7940 - By what date must I conduct performance tests or other initial compliance demonstrations?

    Science.gov (United States)

    2010-07-01

    ... compliance is not demonstrated using a performance test or design evaluation, you must demonstrate initial... performance tests or other initial compliance demonstrations? 63.7940 Section 63.7940 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS...

  1. Component Fragility Research Program: Phase 1, Demonstration tests: Volume 1, Summary report

    International Nuclear Information System (INIS)

    Holman, G.S.; Chou, C.K.; Shipway, G.D.; Glozman, V.

    1987-08-01

    This report describes tests performed in Phase I of the NRC Component Fragility Research Program. The purpose of these tests was to demonstrate procedures for characterizing the seismic fragility of a selected component, investigating how various parameters affect fragility, and finally using test data to develop practical fragility descriptions suitable for application in probabilistic risk assessments. A three-column motor control center housing motor controllers of various types and sizes as well as relays of different types and manufacturers was subjected to seismic input motions up to 2.5g zero period acceleration. To investigate the effect of base flexibility on the structural behavior of the MCC and on the functional behavior of the electrical devices, multiple tests were performed on each of four mounting configurations: four bolts per column with top bracking, four bolts per column with no top brace, four bolts per column with internal diagonal bracking, and two bolts per column with no top or internal bracking. Device fragility was characterized by contact chatter correlated to local in-cabinet response at the device location. Seismic capacities were developed for each device on the basis of local input motion required to cause chatter; these results were then applied to develop probabilistic fragility curves for each type of device, including estimates of the ''high-confidence low probability of failure'' capacity of each

  2. Complete braided adsorbent for marine testing to demonstrate 3g-U/kg-adsorbent

    Energy Technology Data Exchange (ETDEWEB)

    Janke, Chris [ORNL; Yatsandra, Oyola [ORNL; Mayes, Richard [ORNL; none,; Gill, Gary [PNNL; Li-Jung, Kuo [PNNL; Wood, Jordana [PNNL; Sadananda, Das [ORNL

    2014-04-30

    ORNL has manufactured four braided adsorbents that successfully demonstrated uranium adsorption capacities ranging from 3.0-3.6 g-U/kg-adsorbent in marine testing at PNNL. Four new braided and leno woven fabric adsorbents have also been prepared by ORNL and are currently undergoing marine testing at PNNL.

  3. Steam generator chemical cleaning demonstration test No. 1 in a pot boiler

    International Nuclear Information System (INIS)

    Key, G.L.; Helyer, M.H.

    1981-04-01

    The effectiveness of the Electric Power Research Institute (EPRI Mark I) chemical cleaning solvent process was tested utilizing a 12 tube pot boiler that had previously been fouled and dented under 30 days of high chloride fault chemistry operation. Specifically, the intent of this chemical cleaning test was to: (1) dissolve sludge from the tubesheet, (2) remove non-protective magnetite from dented tube/support crevice regions, and (3) quantify the extent of corrosion of steam generator material during the test. Two laboratory cleaning demonstrations of 191 and 142 hours were performed

  4. CERN Technical training 2008 - Learning for the LHC: Special Workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrates that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the electro...

  5. CERN Technical training 2008 - Learning for the LHC: Special Workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrate that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of the utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the elec...

  6. CERN Technical training 2008 - Learning for the LHC: Special workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrate that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of the utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the elec...

  7. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration: Second Results Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Chandler, K.

    2012-07-01

    This report presents results of a demonstration of 12 new fuel cell electric buses (FCEB) operating in Oakland, California. The 12 FCEBs operate as a part of the Zero Emission Bay Area (ZEBA) Demonstration, which also includes two new hydrogen fueling stations. This effort is the largest FCEB demonstration in the United States and involves five participating transit agencies. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The first results report was published in August 2011, describing operation of these new FCEBs from September 2010 through May 2011. New results in this report provide an update through April 2012.

  8. Tuned Chamber Core Panel Acoustic Test Results

    Science.gov (United States)

    Schiller, Noah H.; Allen, Albert R.

    2016-01-01

    This report documents acoustic testing of tuned chamber core panels, which can be used to supplement the low-frequency performance of conventional acoustic treatment. The tuned chamber core concept incorporates low-frequency noise control directly within the primary structure and is applicable to sandwich constructions with a directional core, including corrugated-, truss-, and fluted-core designs. These types of sandwich structures have long, hollow channels (or chambers) in the core. By adding small holes through one of the facesheets, the hollow chambers can be utilized as an array of low-frequency acoustic resonators. These resonators can then be used to attenuate low-frequency noise (below 400 Hz) inside a vehicle compartment without increasing the weight or size of the structure. The results of this test program demonstrate that the tuned chamber core concept is effective when used in isolation or combined with acoustic foam treatments. Specifically, an array of acoustic resonators integrated within the core of the panels was shown to improve both the low-frequency absorption and transmission loss of the structure in targeted one-third octave bands.

  9. EPA program to demonstrate mitigation measures for indoor radon: initial results

    International Nuclear Information System (INIS)

    Henschel, D.B.; Scott, A.G.

    1986-01-01

    EPA has installed radon mitigation techniques in 18 concrete block basement homes in the Reading Prong region of eastern Pennsylvania. Three alternative active soil ventilation approaches were tested: suction on the void network within the concrete block basement walls; suction on the footing drain tile system; and suction on the aggregate underneath the concrete slab. The initial 18 mitigation installations were designed to demonstrate techniques which would have low to moderate installation and operating costs. Where effective closure of major openings in the block walls is possible, suction on the wall voids has proved to be extremely effective, able to reduce homes having very high radon Working Levels (up to 7 WL) to 0.02 WL and less. However, where inaccessible major openings are concealed within the wall, it is more difficult and/or more expensive to develop adequate suction on the void network, and performance is reduced. Testing is continuing to demonstrate the steps required to achieve high performance with wall suction in homes with such difficult-to close walls. Drain tile suction can be very effective where the drain tiles completely surround the home; drain tile suction is the least expensive and most aesthetic of the active soil ventilation approaches, but appears susceptible to spikes in radon levels when the basement is depressurized. Sub-slab suction as tested in this study - with one or two individual suction points in the slab - does not appear adequate to ensure sustained high levels of reduction on block wall basement homes; it appears to effectively treat slab-related soil gas entry routes so long as a uniform layer of aggregate is present, but it does not appear to effectively treat the wall-related entry routes. Closure of major openings might have improved sub-slab suction performance. 5 figures, 3 tables

  10. HTTR demonstration test plan for industrial utilization of nuclear heat

    International Nuclear Information System (INIS)

    Sato, Hiroyuki; Ohashi, Hirofumi; Yan, Xing L.; Kubo, Shinji; Nishihara, Tetsuo; Tachibana, Yukio; Inagaki, Yoshiyuki

    2014-09-01

    Japan Atomic Energy Agency has been conducting research and development with a central focus on the utilization of High Temperature engineering Test Reactor (HTTR), the first High Temperature Gas-cooled Reactor (HTGR) in Japan, towards the realization of industrial use of nuclear heat. Several studies have made on the integration of the HTTR with thermochemical iodine-sulfur process and steam methane reforming hydrogen production plant (H 2 plant) as well as helium gas turbine power conversion system. In addition, safety standards for coupling a H 2 plant to a nuclear facility has been investigated. Based on the past design information, the present study identified test items to be validated in the HTTR demonstration test to accomplish a formulation of safety requirement and design consideration for coupling a H 2 plant to a nuclear facility as well as confirmation of overall performance of helium gas turbine system. In addition, plant concepts for the heat utilization system to be connected with the HTTR are investigated. (author)

  11. Test Results for the Automated Rendezvous and Capture System

    Science.gov (United States)

    Cruzen, Craig; Dabney, Richard; Lomas, James

    1999-01-01

    The Automated Rendezvous and Capture (AR&C) system was designed and tested at NASA's Marshall Space Flight Center (MSFC) to demonstrate technologies and mission strategies for automated rendezvous and docking of spacecraft in Earth orbit, The system incorporates some of the latest innovations in Global Positioning, System space navigation, laser sensor technologies and automated mission sequencing algorithms. The system's initial design and integration was completed in 1998 and has undergone testing at MSFC. This paper describes the major components of the AR&C system and presents results from the official system tests performed in MSFC's Flight Robotics Laboratory with digital simulations and hardware in the loop tests. The results show that the AR&C system can safely and reliably perform automated rendezvous and docking missions in the absence of system failures with 100 percent success. When system failures are included, the system uses its automated collision avoidance maneuver logic to recover in a safe manner. The primary objective of the AR&C project is to prove that by designing a safe and robust automated system, mission operations cost can be reduced by decreasing the personnel required for mission design, preflight planning and training required for crewed rendezvous and docking missions.

  12. Fusion power demonstration - a baseline for the mirror engineering test reactor

    International Nuclear Information System (INIS)

    Henning, C.D.; Logan, B.G.; Neef, W.S.

    1983-01-01

    Developing a definition of an engineering test reactor (ETR) is a current goal of the Office of Fusion Energy (OFE). As a baseline for the mirror ETR, the Fusion Power Demonstration (FPD) concept has been pursued at Lawrence Livermore National Laboratory (LLNL) in cooperation with Grumman Aerospace, TRW, and the Idaho National Engineering Laboratory. Envisioned as an intermediate step to fusion power applications, the FPD would achieve DT ignition in the central cell, after which blankets and power conversion would be added to produce net power. To achieve ignition, a minimum central cell length of 67.5 m is needed to supply the ion and alpha particles radial drift pumping losses in the transition region. The resulting fusion power is 360 MW. Low electron-cyclotron heating power of 12 MW, ion-cyclotron heating of 2.5 MW, and a sloshing ion beam power of 1.0 MW result in a net plasma Q of 22. A primary technological challenge is the 24-T, 45-cm bore choke coil, comprising a copper hybrid insert within a 15 to 18 T superconducting coil

  13. SP-100 Fuel Pin Performance: Results from Irradiation Testing

    Science.gov (United States)

    Makenas, Bruce J.; Paxton, Dean M.; Vaidyanathan, Swaminathan; Marietta, Martin; Hoth, Carl W.

    1994-07-01

    A total of 86 experimental fuel pins with various fuel, liner, and cladding candidate materials have been irradiated in the Experimental Breeder Reactor-II (EBR-II) and the Fast Flux Test Facility (FFTF) reactor as part of the SP-100 fuel pin irradiation testing program. Postirradiation examination results from these fuel pins are key in establishing performance correlations and demonstrating the lifetime and safety of the reactor fuel system. This paper provides a brief description of the in-reactor fuel pin tests and presents the most recent irradiation data on the performance of wrought rhenium (Re) liner material and high density UN fuel at goal burnup of 6 atom percent (at. %). It also provides an overview of the significant variety of other fuel/liner/cladding combinations which were irradiated as part of this program and which may be of interest to more advanced efforts.

  14. Demonstration Results on the Effects of Mercury Speciation on the Stabilization of Wastes

    International Nuclear Information System (INIS)

    Conley, T.B.; Hulet, G.A.; Morris, M.I.; Osborne-Lee, I.W.

    1999-01-01

    Mercury-contaminated wastes are currently being stored at approximately 19 Department of Energy sites, the volume of which is estimated to be about 16m(sup)3. These wastes exist in various forms including soil, sludges, and debris, which present a particular challenge regarding possible mercury stabilization methods. This reports provides the test results of three vendors, Allied Technology Group, IT Corporation, and Nuclear Fuel Services, Inc., that demonstrate the effects of mercury speciation on the stabilization of the mercury wastes. Mercury present in concentrations that exceed 260 parts per million must be removed by extraction methods and requires stabilization to ensure that the final wasteforms leach less than 0.2mg/L of mercury by the Toxicity Characteristic Leaching Procedure or 0.025 mg/L using the Universal Treatment Standard

  15. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  16. Evaluation of gaseous emissions produced in the tests on the demonstration plant for sludge drying and incineration

    International Nuclear Information System (INIS)

    Lotito, V.; Spinosa, L.; Antonacci, R.; Mininni, G.

    2001-01-01

    Incineration is a valid alternative to other more diffused disposal systems (agricultural use, landfill), when they cannot be applied due to high pollutants concentrations or other unforeseeable constraints. However, it can cause severe air pollution by inorganic (heavy metals) and organic (PAHs, PCDDs, PCDFs) pollutants, particulate, NO x , CO and acidic compounds; this fact has raised public concern about incineration and has hindered a wider application of this practice. Water Research Institute of Italian National Research Council realised a demonstration plant mainly consisting of a fluidized bed furnace, a rotary kiln furnace, a dryer with heat recovery section, particulate and acidic compounds removal apparatuses, and set up a research programme to demonstrate that incineration is a safe operation and can comply the relevant legislation, as far as organic and inorganic micropollutants are concerned. A total of 40 tests were carried out (30 with the fluidized bed furnace and 10 with rotary kiln one) treating dewatered sludges (in many cases with the addition of high chlorinated compounds and Cu salts) or dried ones, under different operating conditions (furnace temperature, after-burner temperature, chlorine concentration). Particulate concentrations, and consequently heavy metals concentrations, at the stack resulted in any case under legal limits. As far as conventional pollutants are concerned, only HCl and CO overcame sometimes standards, mainly due to temporary operating up-sets. PAHs concentration resulted quite constant, thus demonstrating that tests were operated in steady-state and satisfactory conditions. Also dioxins and furans overcame sometimes standards, but no correlation was found with more severe tests conditions; it happened when plant up-set conditions occurred. Operation resulted quite satisfactory, but dryer operation required constant operators attention. In rotary kiln furnace a build up of solidified ashes occurred in counter

  17. Integrated test plan ResonantSonic drilling system technology demonstration-1995, at the Hanford Site: Revision 1

    International Nuclear Information System (INIS)

    McLellan, G.W.

    1994-01-01

    This integrated test plan describes the demonstration test of the ResonantSonic drilling system. This demonstration is part of the Office of Technology Development's Volatile Organic Compound Arid Integrated Demonstration (VOC-Arid ID). Two main purposes of this demonstration are (1) to continue testing the ResonantSonic drilling system compatibility with the Hanford Site waste characterization programs, and (2) to transfer this method for use at the Hanford Site, other government sites, and the private sector. The ResonantSonic method is a dry drilling technique. Field testing of this method began in July 1993. During the next four months, nine holes were drilled, and continuous core samples were retrieved. Penetration rates were 2 to 3 times the baseline, and the operational downtime rate was less than 10%. Successfully demonstrated equipment refinements included a prototype 300 series ResonantSonic head, a new drill rod design for 18-centimeter diameter pipe, and an automated pipe handling system. Various configurations of sampling equipment and drill bits were tested, depending on geologic conditions. The principal objective of the VOC-Arid ID is to determine the viability of emerging technologies that can be used to characterize, remediate, and/or monitor arid or semiarid sites containing VOCs (e.g., carbon tetrachloride) with or without associated metal and radionuclide contamination

  18. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Sixth Report

    Science.gov (United States)

    2017-09-01

    This report presents results of a demonstration of fuel cell electric buses (FCEBs) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration that includes 13 advanced-d...

  19. Planning an Availability Demonstration Test with Consideration of Confidence Level

    Directory of Open Access Journals (Sweden)

    Frank Müller

    2017-08-01

    Full Text Available The full service life of a technical product or system is usually not completed after an initial failure. With appropriate measures, the system can be returned to a functional state. Availability is an important parameter for evaluating such repairable systems: Failure and repair behaviors are required to determine this availability. These data are usually given as mean value distributions with a certain confidence level. Consequently, the availability value also needs to be expressed with a confidence level. This paper first highlights the bootstrap Monte Carlo simulation (BMCS for availability demonstration and inference with confidence intervals based on limited failure and repair data. The BMCS enables point-, steady-state and average availability to be determined with a confidence level based on the pure samples or mean value distributions in combination with the corresponding sample size of failure and repair behavior. Furthermore, the method enables individual sample sizes to be used. A sample calculation of a system with Weibull-distributed failure behavior and a sample of repair times is presented. Based on the BMCS, an extended, new procedure is introduced: the “inverse bootstrap Monte Carlo simulation” (IBMCS to be used for availability demonstration tests with consideration of confidence levels. The IBMCS provides a test plan comprising the required number of failures and repair actions that must be observed to demonstrate a certain availability value. The concept can be applied to each type of availability and can also be applied to the pure samples or distribution functions of failure and repair behavior. It does not require special types of distribution. In other words, for example, a Weibull, a lognormal or an exponential distribution can all be considered as distribution functions of failure and repair behavior. After presenting the IBMCS, a sample calculation will be carried out and the potential of the BMCS and the IBMCS

  20. Status of the Virginia Power/DOE Cooperative Cask Testing/Demonstration Program: A video presentation

    International Nuclear Information System (INIS)

    McKinnon, M.A.; Creer, J.M.; Collantes, C.E.

    1990-01-01

    This paper is documentation of a video presentation and provides a brief summary of the Virginia power/US Department of Energy Cooperative Cask Testing/Demonstration Program. The program consists of two phases. The first phase has been completed and involved the unlicensed performance testing (heat transfer and shielding) of three metal spent fuel storage casks at the federally owned Idaho National Engineering Laboratory. The second phase is ongoing and consists of licensed demonstrations of standard casks from two different vendors and of one or two enhanced capacity casks. 6 refs., 1 tab

  1. Irradiation effects test Series Scoping Test 1: test results report

    International Nuclear Information System (INIS)

    Quapp, W.J.; Allison, C.M.; Farrar, L.C.

    1977-09-01

    The report describes the results of the first scoping test in the Irradiation Effects Test Series conducted by the Thermal Fuels Behavior Program, which is part of the Water Reactor Research Program of EG and G Idaho, Inc. The research is sponsored by the United States Nuclear Regulatory Commission. This test used an unirradiated, three-foot-long, PWR-type fuel rod. The objective of this test was to thoroughly evaluate the remote fabrication procedures to be used for irradiated rods in future tests, handling plans, and reactor operations. Additionally, selected fuel behavior data were obtained. The fuel rod was subjected to a series of preconditioning power cycles followed by a power increase which brought the fuel rod power to about 20.4 kW/ft peak linear heat rating at a coolant mass flux of 1.83 x 10 6 lb/hr-ft 2 . Film boiling occurred for a period of 4.8 minutes following flow reductions to 9.6 x 10 5 and 7.5 x 10 5 lb/hr-ft 2 . The test fuel rod failed following reactor shutdown as a result of heavy internal and external cladding oxidation and embrittlement which occurred during the film boiling operation

  2. Hyper-X Mach 7 Scramjet Design, Ground Test and Flight Results

    Science.gov (United States)

    Ferlemann, Shelly M.; McClinton, Charles R.; Rock, Ken E.; Voland, Randy T.

    2005-01-01

    The successful Mach 7 flight test of the Hyper-X (X-43) research vehicle has provided the major, essential demonstration of the capability of the airframe integrated scramjet engine. This flight was a crucial first step toward realizing the potential for airbreathing hypersonic propulsion for application to space launch vehicles. However, it is not sufficient to have just achieved a successful flight. The more useful knowledge gained from the flight is how well the prediction methods matched the actual test results in order to have confidence that these methods can be applied to the design of other scramjet engines and powered vehicles. The propulsion predictions for the Mach 7 flight test were calculated using the computer code, SRGULL, with input from computational fluid dynamics (CFD) and wind tunnel tests. This paper will discuss the evolution of the Mach 7 Hyper-X engine, ground wind tunnel experiments, propulsion prediction methodology, flight results and validation of design methods.

  3. Test results of the UNK superconducting dipole magnets

    International Nuclear Information System (INIS)

    Ageev, A.I.; Andreev, N.I.; Gridasov, V.I.

    1993-01-01

    Results of studied, training, temperature and velocity dependence of 25 critical current of superconducting magnets (SC), as well as, of dynamic losses of dipole and statical inflows in UNK operating cycle at currents that are higher than critical ones (5250 A), are presented. Service life tests of SC-dipole demonstrated that their design may ensure durable operation of magnets under UNK conditions. Conclusions are made that temperature margin of magnets equal to 0.8 K will enable to ensure their reliable operation under dynamic and radiation heat releases at acceleration and extraction of beam, as well as, under emergency extraction of stored energy. 4 refs.; 5 figs

  4. Selected Test Results from the Encell Technology Nickel Iron Battery

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Summer Kamal Rhodes [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Advanced Power Sources R& D; Baca, Wes Edmund [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Advanced Power Sources R& D; Avedikian, Kristan [Encell Technology, Alachua, FL (United States)

    2014-09-01

    The performance of the Encell Nickel Iron (NiFe) battery was measured. Tests included capacity, capacity as a function of rate, capacity as a function of temperature, charge retention (28-day), efficiency, accelerated life projection, and water refill evaluation. The goal of this work was to evaluate the general performance of the Encell NiFe battery technology for stationary applications and demonstrate the chemistry's capabilities in extreme conditions. Test results have indicated that the Encell NiFe battery technology can provide power levels up to the 6C discharge rate, ampere-hour efficiency above 70%. In summary, the Encell batteries have met performance metrics established by the manufacturer. Long-term cycle tests are not included in this report. A cycle test at elevated temperature was run, funded by the manufacturer, which Encell uses to predict long-term cycling performance, and which passed their prescribed metrics.

  5. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Third Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Post, M.

    2014-05-01

    This report presents results of a demonstration of 12 fuel cell electric buses (FCEB) operating in Oakland, California. The 12 FCEBs operate as a part of the Zero Emission Bay Area (ZEBA) Demonstration, which also includes two new hydrogen fueling stations. This effort is the largest FCEB demonstration in the United States and involves five participating transit agencies. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published two previous reports, in August 2011 and July 2012, describing operation of these buses. New results in this report provide an update covering eight months through October 2013.

  6. Results of the 1000 Hour Rotary Microfilter Endurance Test

    International Nuclear Information System (INIS)

    Herman, D.

    2010-01-01

    During operation, a primary concern is lifetime of the mechanical seal. Leakage from main shaft mechanical seal is expected to be first indication of wear on rotary filter but will not be the ultimate failure of the filter. Initial clearance inadequate to support thermal expansion resulted in initial scarring of journal. Tolerances adjusted and no journal issues were found during 1000 hour test. Disassembly and inspection of the rotary joint seals showed no unusual wear. No leakage observed during test. Total operation time over 1500 hours. Test summary successfully demonstrated: (1) Filtration of a 'challenging' SRS simulant up to 15 wt % insoluble solids in a 5.6 M salt simulant; (2) Sludge washing; (3) In-situ acid cleaning with dilute acid; (4) Over 1000 hours of operation on new journal material; and (5) Over 1500 hours of operation on all seals. The filter out lasted: 2 air compressors, 2 power outages (one planned), 2 chillers, 1 fire, 1 electrical breaker and 1 feed pump seal.

  7. Hot-Fire Test Results of Liquid Oxygen/RP-2 Multi-Element Oxidizer-Rich Preburners

    Science.gov (United States)

    Protz, C. S.; Garcia, C. P.; Casiano, M. J.; Parton, J. A.; Hulka, J. R.

    2016-01-01

    As part of the Combustion Stability Tool Development project funded by the Air Force Space and Missile Systems Center, the NASA Marshall Space Flight Center was contracted to assemble and hot-fire test a multi-element integrated test article demonstrating combustion characteristics of an oxygen/hydrocarbon propellant oxidizer-rich staged-combustion engine thrust chamber. Such a test article simulates flow through the main injectors of oxygen/kerosene oxidizer-rich staged combustion engines such as the Russian RD-180 or NK-33 engines, or future U.S.-built engine systems such as the Aerojet-Rocketdyne AR-1 engine or the Hydrocarbon Boost program demonstration engine. To supply the oxidizer-rich combustion products to the main injector of the integrated test article, existing subscale preburner injectors from a previous NASA-funded oxidizer-rich staged combustion engine development program were utilized. For the integrated test article, existing and newly designed and fabricated inter-connecting hot gas duct hardware were used to supply the oxidizer-rich combustion products to the oxidizer circuit of the main injector of the thrust chamber. However, before one of the preburners was used in the integrated test article, it was first hot-fire tested at length to prove it could provide the hot exhaust gas mean temperature, thermal uniformity and combustion stability necessary to perform in the integrated test article experiment. This paper presents results from hot-fire testing of several preburner injectors in a representative combustion chamber with a sonic throat. Hydraulic, combustion performance, exhaust gas thermal uniformity, and combustion stability data are presented. Results from combustion stability modeling of these test results are described in a companion paper at this JANNAF conference, while hot-fire test results of the preburner injector in the integrated test article are described in another companion paper.

  8. Irradiation effects test series, test IE-5. Test results report

    International Nuclear Information System (INIS)

    Croucher, D.W.; Yackle, T.R.; Allison, C.M.; Ploger, S.A.

    1978-01-01

    Test IE-5, conducted in the Power Burst Facility at the Idaho National Engineering Laboratory, employed three 0.97-m long pressurized water reactor type fuel rods, fabricated from previously irradiated zircaloy-4 cladding and one similar rod fabricated from unirradiated cladding. The objectives of the test were to evaluate the influence of simulated fission products, cladding irradiation damage, and fuel rod internal pressure on pellet-cladding interaction during a power ramp and on fuel rod behavior during film boiling operation. The four rods were subjected to a preconditioning period, a power ramp to an average fuel rod peak power of 65 kW/m, and steady state operation for one hour at a coolant mass flux of 4880 kg/s-m 2 for each rod. After a flow reduction to 1800 kg/s-m 2 , film boiling occurred on one rod. Additional flow reductions to 970 kg/s-m 2 produced film boiling on the three remaining fuel rods. Maximum time in film boiling was 80s. The rod having the highest initial internal pressure (8.3 MPa) failed 10s after the onset of film boiling. A second rod failed about 90s after reactor shutdown. The report contains a description of the experiment, the test conduct, test results, and results from the preliminary postirradiation examination. Calculations using a transient fuel rod behavior code are compared with the test results

  9. Demonstration test on manufacturing steel bars for concrete reinforcement for recycling of reactor decommissioning metal scrap

    International Nuclear Information System (INIS)

    Sakurai, D.; Anabuki, Y.

    1993-01-01

    To prove the possibility of recycling the steel scrap resulting from decommissioning of a nuclear power plant, this salvaged steel would be formed into steel bars for concrete reinforcement, as the restricted use and limited use at nuclear plants. The shifting behavior of radioactive isotopes (RI) in the melting process was confirmed through the laboratory hot test using the RI. Then, the demonstration cold test for steel bars for reinforcement using the nonradioactive isotope was conducted in on-line production facilities. In this test the quality of steel bars and uniform distribution of RI were proven and material balance and operational data were obtained. These data show the recycling to steel bars for concrete reinforcement is applicable from economical and safety aspects

  10. Field demonstration of CO2 leakage detection in potable aquifers with a pulselike CO2-release test.

    Science.gov (United States)

    Yang, Changbing; Hovorka, Susan D; Delgado-Alonso, Jesus; Mickler, Patrick J; Treviño, Ramón H; Phillips, Straun

    2014-12-02

    This study presents two field pulselike CO2-release tests to demonstrate CO2 leakage detection in a shallow aquifer by monitoring groundwater pH, alkalinity, and dissolved inorganic carbon (DIC) using the periodic groundwater sampling method and a fiber-optic CO2 sensor for real-time in situ monitoring of dissolved CO2 in groundwater. Measurements of groundwater pH, alkalinity, DIC, and dissolved CO2 clearly deviated from their background values, showing responses to CO2 leakage. Dissolved CO2 observed in the tests was highly sensitive in comparison to groundwater pH, DIC, and alkalinity. Comparison of the pulselike CO2-release tests to other field tests suggests that pulselike CO2-release tests can provide reliable assessment of geochemical parameters indicative of CO2 leakage. Measurements by the fiber-optic CO2 sensor, showing obvious leakage signals, demonstrated the potential of real-time in situ monitoring of dissolved CO2 for leakage detection at a geologic carbon sequestration (GCS) site. Results of a two-dimensional reactive transport model reproduced the geochemical measurements and confirmed that the decrease in groundwater pH and the increases in DIC and dissolved CO2 observed in the pulselike CO2-release tests were caused by dissolution of CO2 whereas alkalinity was likely affected by carbonate dissolution.

  11. Boraflex test results and evaluation

    International Nuclear Information System (INIS)

    Lindquist, K.; Kline, D.E.; Haley, T.C.

    1993-02-01

    New data developed, collected, and evaluated to further assess the in-pool performance of the neutron absorber material, Boraflex. The data are from new EPRI test programs, utility surveillance programs, and blackness testing at a number of plants. This new data provides a basis for quantifying the gap phenomenon in full length panels of Boraflex in spent fuel racks; the maximum anticipated gap size, frequency of gap occurrence, and axial distribution of gaps. Methods have been developed to assess the reactivity effects of gaps and Boraflex shrinkage. The analyses presented demonstrates that the reactivity effect of gaps is very small, not much larger than the statistical variations inherent in the calculational method. The data and analyses presented serve to close the issue of gap formation and shrinkage in panels of Boraflex and the effect of such gaps and shrinkage on the reactivity of the fuel/rack configuration. Ongoing EPRI programs to assess the long term performance of Boraflex in spent fuel storage racks are described

  12. In situ vitrification: Test results for a contaminated soil-melting process

    International Nuclear Information System (INIS)

    Buelt, J.L.; Timmerman, C.L.; Westsik, J.H. Jr.

    1989-10-01

    In situ vitrification (ISV) is being developed at Pacific Northwest Laboratory for the Department of Energy to stabilize soils and sludges that are contaminated with radioactive and hazardous chemical wastes. ISV is a process that immobilizes contaminated soil in place by converting it to a durable glass and crystalline product similar to obsidian and basalt. In June 1987, a large-scale test of the process was completed at a transuranic-contaminated soil site. The test constituted the first full-scale demonstration of ISV at an actual site. This paper summarizes the results of that test and describes the potential adaptation of the process to radioactive and hazardous chemical waste-contaminated soils. 15 refs., 9 figs., 3 tabs

  13. FIRST RESULTS FROM OEDOTENSIOMETRIC TESTS

    Directory of Open Access Journals (Sweden)

    Luigi Cavazza

    2008-09-01

    Full Text Available An oedotensiometer was used to examine to examine the behaviour of sieved sample of a swelling soil (a vertisol as well as of the same soils treated with solution of Na+ + Ca2+ to simulate the soil changes from excessive irrigation with brackish water. The oedometer test consisted in an infiltration of water from below through a ceramic porous plate at a feeding pressure of +10 cm water and successive drainage under a depression mostly of -112 cm of water. The rate of water entry as well as the swelling rate of the sample were monitored. Preliminary considerations regards the domains in which the shrinkage curve of a swelling soil is subdivided and make hypothesis on the swelling process expected when the infiltration from below of the sample is applied. The results support the hypothesis that when the water pressure is applied some water enters rather rapidly in the larger structural pores and is followed later by the swelling in the smaller pores, responsible for the basic domain. This first conclusion demonstrates that the assumption of a simultaneous movement of solid and liquid components in the sample, which is the base of most theoretical developments for swelling soils, cannot be accepted for the tested samples. Some cases with water clogging on the sample surface confirm a late final swelling of the soil and permitted to evaluate the hydraulic conductivity of the swollen soil. These manifestations are more evident in sodicated soils. The loading of the sample reduces the swelling of the sample and seems to reduce its permeability. The reduction of the feeding water pressure further reduces the sample swelling. The draining process from saturated soil sample shows that most of the process occurs in the large pores of the structural domain. This gives the possibility to evaluate the water diffusivity coefficient for the structural domain of the sample. In draining the soil with the highest sodication there was a variation of soil volume

  14. HFC-134A and HCFC-22 supermarket refrigeration demonstration and laboratory testing. Phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    Aspen Systems and a team of nineteen agencies and industry participants conducted a series of tests to determine the performance of HFC-134a, HCFC-22, and CFC-502 for supermarket application. This effort constitutes the first phase of a larger project aimed at carrying out both laboratory and demonstration tests of the most viable HFC refrigerants and the refrigerants they replace. The results of the Phase I effort are presented in the present report. The second phase of the project has also been completed. It centered on testing all viable HFC replacement refrigerants for CFC-502. These were HFC-507, HFC-404A, and HFC-407A. The latter results are published in the Phase II report for this project. As part of Phase I, a refrigeration rack utilizing a horizontal open drive screw compressor was constructed in our laboratory. This refrigeration rack is a duplicate of one we have installed in a supermarket in Clifton Park, NY.

  15. The Estimation of Knowledge Solidity Based on the Comparative Analysis of Different Test Results

    Directory of Open Access Journals (Sweden)

    Y. K. Khenner

    2012-01-01

    Full Text Available At present, the testing techniques of knowledge estimation are widely spread in educational system. However, this method is seriously criticized including its application to the Unified State Examinations. The research is aimed at studying the limitations of testing techniques. The authors recommend a new way of knowledge solid- ity estimation bases on the comparative results analysis of various kinds of tests. While testing the large group of students, the authors found out that the results of the closed and open tests substantially differ. The comparative analysis demonstrates that the open tests assessment of the knowledge solidity is more adequate than that of the closed ones. As the research is only based on a single experiment, the authors recommend using this method further, substantiating the findings concerning the differences in tests results, and analyzing the advantages and disadvantages of the tests in question. 

  16. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    Science.gov (United States)

    Meer, David W.; Oriti, Salvatore M.

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, GRC has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  17. Laser Spectroscopy Multi-Gas Monitor: Results of Technology Demonstration on ISS

    Science.gov (United States)

    Mudgett, Paul D.; Pilgrim, Jeffrey S.

    2015-01-01

    Tunable diode laser spectroscopy (TDLS) is an up and coming trace and major gas monitoring technology with unmatched selectivity, range and stability. The technology demonstration of the 4 gas Multi-Gas Monitor (MGM), reported at the 2014 ICES conference, operated continuously on the International Space Station (ISS) for nearly a year. The MGM is designed to measure oxygen, carbon dioxide, ammonia and water vapor in ambient cabin air in a low power, relatively compact device. While on board, the MGM experienced a number of challenges, unplanned and planned, including a test of the ammonia channel using a commercial medical ammonia inhalant. Data from the unit was downlinked once per week and compared with other analytical resources on board, notably the Major Constituent Analyzer (MCA), a magnetic sector mass spectrometer. MGM spent the majority of the time installed in the Nanoracks Frame 2 payload facility in front breathing mode (sampling the ambient environment of the Japanese Experiment Module), but was also used to analyze recirculated rack air. The capability of the MGM to be operated in portable mode (via internal rechargeable lithium ion polymer batteries or by plugging into any Express Rack 28VDC connector) was a part of the usability demonstration. Results to date show unprecedented stability and accuracy of the MGM vs. the MCA for oxygen and carbon dioxide. The ammonia challenge (approx. 75 ppm) was successful as well, showing very rapid response time in both directions. Work on an expansion of capability in a next generation MGM has just begun. Combustion products and hydrazine are being added to the measurable target analytes. An 8 to 10 gas monitor (aka Gas Tricorder 1.0) is envisioned for use on ISS, Orion and Exploration missions.

  18. Long-term ETR/INTOR magnet testing in support of the demonstration fusion reactor

    International Nuclear Information System (INIS)

    Herring, J.S.; Shah, V.N.; Rouhani, S.Z.

    1983-01-01

    This study considers ways that the proposed Engineering Test Reactor (ETR), or the proposed International Tokamak Reactor (INTOR), can be used for magnet performance tests that would be useful for the design and operation of the Demonstration Tokamak Power Plant (DEMO). Such testing must not interfere with the main function of the ETR/INTOR as an integrated fusion reactor. A performance test plan for the ETR/INTOR magnets is proposed and appropriate tests on the magnets is proposed and appropriate tests on the magnets for each phase of the ETR/INTOR operation are described. The suggested tests would verify design requirements and monitor long-term changes due to radiation. This paper also summarizes the design and operational performance of existing superconducting magnets and identifies the known failures and their predominant causes

  19. Results of Large-Scale Spacecraft Flammability Tests

    Science.gov (United States)

    Ferkul, Paul; Olson, Sandra; Urban, David L.; Ruff, Gary A.; Easton, John; T'ien, James S.; Liao, Ta-Ting T.; Fernandez-Pello, A. Carlos; Torero, Jose L.; Eigenbrand, Christian; hide

    2017-01-01

    gas expansion. These results clearly demonstrate the unique features of purely forced flow in microgravity on flame spread, the dependence of flame behavior on the scale of the experiment, and the importance of full-scale testing for spacecraft fire safety.

  20. MP98, an innovative reactivity control system for LWR and VHTR, tests results on prototypes

    International Nuclear Information System (INIS)

    Emin, M.; Gagne, J.F.

    2005-01-01

    MP98' Reactivity Control System is now a technology tested on a real scale prototypes. Demonstrator is working at PWR real conditions (155 bars, 320 degree C), and many accidents configurations could be simulated. This paper presents the technology, describes the demonstrator design and presents some results. Mock up and demonstrator have permitted to optimize the design of MP98' devices to prepare industrialization. (authors)

  1. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT- CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, R.

    2013-02-26

    The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  2. Design of helium-gas supplying facility of out-of-pile demonstration test for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Fujisaki, Katsuo; Kobayashi, Toshiaki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    1996-09-01

    One of the objectives of the High-Temperature Engineering Test Reactor (HTTR) is to demonstrate effectiveness of high-temperature heat utilization. Prior to connect a heat utilization system to the HTTR, a series of out-of-pile demonstration test is indispensable to improve components` performance, to demonstrate operation, control and safety technologies and to verify analysis codes for design and safety evaluation. After critical review and discussion on the out-of-pile demonstration test, a test facility have been designed. In this report, a helium-gas supplying facility simulated the HTTR system was described in detail, which supplies High-temperature helium-gas of 900degC to a steam reforming facility mocking-up the HTTR heat utilization system. Components of the Helium Engineering Demonstration Loop (HENDEL) were selected to reuse in the helium-gas supplying facility in order to decrease construction cost. Structures and specifications of new components such as a high-temperature heater and a preheater were decided after evaluation of thermal and hydraulic performance and strength. (author)

  3. 40 CFR 63.5991 - By what date must I conduct an initial compliance demonstration or performance test?

    Science.gov (United States)

    2010-07-01

    ... compliance demonstration or performance test? 63.5991 Section 63.5991 Protection of Environment ENVIRONMENTAL... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire... initial compliance demonstration or performance test? (a) If you have a new or reconstructed affected...

  4. Delay/Disruption Tolerant Networks (DTN): Testing and Demonstration for Lunar Surface Applications

    Science.gov (United States)

    2009-01-01

    This slide presentation reviews the testing of the Delay/Disruption Tolerant Network (DTN) designed for use with Lunar Surface applications. This is being done through the DTN experimental Network (DEN), that permit access and testing by other NASA centers, DTN team members and protocol developers. The objective of this work is to demonstrate DTN for high return applications in lunar scenarios, provide DEN connectivity with analogs of Constellation elements, emulators, and other resources from DTN Team Members, serve as a wireless communications staging ground for remote analog excursions and enable testing of detailed communication scenarios and evaluation of network performance. Three scenarios for DTN on the Lunar surface are reviewed: Motion imagery, Voice and sensor telemetry, and Navigation telemetry.

  5. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  6. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  7. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  8. Demonstration of anticoagulation patient self-testing feasibility at an Indian Health Service facility: A case series analysis

    Directory of Open Access Journals (Sweden)

    Schupbach RR

    2013-03-01

    Full Text Available Background: Anticoagulation patient self-testing (PST represents an alternative approach to warfarin monitoring by enabling patients to use coagulometers to test their international normalized ratio (INR values. PST offers several advantages that potentially improve warfarin management. Objective: To describe implementation and associated performance of a PST demonstration program at an Indian Health Service (IHS facility. Methods: A non-consecutive case series analysis of patients from a pharmacy-managed PST demonstration program was performed at an IHS facility in Oklahoma between July 2008 and February 2009.Results: Mean time in therapeutic range (TTR for the seven patients showed a small, absolute increase during the twelve weeks of PST compared to the twelve weeks prior to PST. Four of the seven patients had an increase in TTR during the twelve week course of PST compared to their baseline TTR. Three of four patients with increased TTR in the final eight week period of PST achieved a TTR of 100%. Of the three patients who experienced a decrease in TTR after initiating self-testing, two initially presented with a TTR of 100% prior to PST and one patient had a TTR of 100% for the final eight weeks of PST. The two patients not achieving a TTR of 100% during the twelve week PST period demonstrated an increase in TTR following the first four weeks of PST. Conclusion: Although anticoagulation guidelines now emphasize patient self-management (PSM only, optimal PST remains an integral process in PSM delivery. In the patients studied, the results of this analysis suggest that PST at the IHS facility provided a convenient, alternative method for management of chronic warfarin therapy for qualified patients. More than half of the patients demonstrated improvement in TTR. Although there is a learning curve immediately following PST initiation, the mean TTR for the entire PST period increased modestly when compared to the time period prior to PST.

  9. Irradiation Effects Test Series: Test IE-3. Test results report

    International Nuclear Information System (INIS)

    Farrar, L.C.; Allison, C.M.; Croucher, D.W.; Ploger, S.A.

    1977-10-01

    The objectives of the test reported were to: (a) determine the behavior of irradiated fuel rods subjected to a rapid power increase during which the possibility of a pellet-cladding mechanical interaction failure is enhanced and (b) determine the behavior of these fuel rods during film boiling following this rapid power increase. Test IE-3 used four 0.97-m long pressurized water reactor type fuel rods fabricated from previously irradiated fuel. The fuel rods were subjected to a preconditioning period, followed by a power ramp to 69 kW/m at a coolant mass flux of 4920 kg/s-m 2 . After a flow reduction to 2120 kg/s-m 2 , film boiling occurred on the fuel rods. One rod failed approximately 45 seconds after the reactor was shut down as a result of cladding embrittlement due to extensive cladding oxidation. Data are presented on the behavior of these irradiated fuel rods during steady-state operation, the power ramp, and film boiling operation. The effects of a power ramp and power ramp rates on pellet-cladding interaction are discussed. Test data are compared with FRAP-T3 computer model calculations and data from a previous Irradiation Effects test in which four irradiated fuel rods of a similar design were tested. Test IE-3 results indicate that the irradiated state of the fuel rods did not significantly affect fuel rod behavior during normal, abnormal (power ramp of 20 kW/m per minute), and accident (film boiling) conditions

  10. Test results of reliable and very high capillary multi-evaporators / condenser loop

    Energy Technology Data Exchange (ETDEWEB)

    Van Oost, S; Dubois, M; Bekaert, G [Societe Anonyme Belge de Construction Aeronautique - SABCA (Belgium)

    1997-12-31

    The paper present the results of various SABCA activities in the field of two-phase heat transport system. These results have been based on a critical review and analysis of the existing two-phase loop and of the future loop needs in space applications. The research and the development of a high capillary wick (capillary pressure up to 38 000 Pa) are described. These activities have led towards the development of a reliable high performance capillary loop concept (HPCPL), which is discussed in details. Several loop configurations mono/multi-evaporators have been ground tested. The presented results of various tests clearly show the viability of this concept for future applications. Proposed flight demonstrations as well as potential applications conclude this paper. (authors) 7 refs.

  11. Test results of reliable and very high capillary multi-evaporators / condenser loop

    Energy Technology Data Exchange (ETDEWEB)

    Van Oost, S.; Dubois, M.; Bekaert, G. [Societe Anonyme Belge de Construction Aeronautique - SABCA (Belgium)

    1996-12-31

    The paper present the results of various SABCA activities in the field of two-phase heat transport system. These results have been based on a critical review and analysis of the existing two-phase loop and of the future loop needs in space applications. The research and the development of a high capillary wick (capillary pressure up to 38 000 Pa) are described. These activities have led towards the development of a reliable high performance capillary loop concept (HPCPL), which is discussed in details. Several loop configurations mono/multi-evaporators have been ground tested. The presented results of various tests clearly show the viability of this concept for future applications. Proposed flight demonstrations as well as potential applications conclude this paper. (authors) 7 refs.

  12. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  13. Alternative filtration testing program: Pre-evaluation of test results

    International Nuclear Information System (INIS)

    Georgeton, G.K.; Poirier, M.R.

    1990-01-01

    Based on results of testing eight solids removal technologies and one pretreatment option, it is recommended that a centrifugal ultrafilter and polymeric ultrafilter undergo further testing as possible alternatives to the Norton Ceramic filters. Deep bed filtration should be considered as a third alternative, if a backwashable cartridge filter is shown to be inefficient in separate testing

  14. Alternative filtration testing program: Pre-evaluation of test results

    Energy Technology Data Exchange (ETDEWEB)

    Georgeton, G.K.; Poirier, M.R.

    1990-09-28

    Based on results of testing eight solids removal technologies and one pretreatment option, it is recommended that a centrifugal ultrafilter and polymeric ultrafilter undergo further testing as possible alternatives to the Norton Ceramic filters. Deep bed filtration should be considered as a third alternative, if a backwashable cartridge filter is shown to be inefficient in separate testing.

  15. Hot-Fire Test Results of an Oxygen/RP-2 Multi-Element Oxidizer-Rich Staged-Combustion Integrated Test Article

    Science.gov (United States)

    Hulka, J. R.; Protz, C. S.; Garcia, C. P.; Casiano, M. J.; Parton, J. A.

    2016-01-01

    As part of the Combustion Stability Tool Development project funded by the Air Force Space and Missile Systems Center, the NASA Marshall Space Flight Center was contracted to assemble and hot-fire test a multi-element integrated test article demonstrating combustion characteristics of an oxygen/hydrocarbon propellant oxidizer-rich staged-combustion engine thrust chamber. Such a test article simulates flow through the main injectors of oxygen/kerosene oxidizer-rich staged combustion engines such as the Russian RD-180 or NK-33 engines, or future U.S.-built engine systems such as the Aerojet-Rocketdyne AR-1 engine or the Hydrocarbon Boost program demonstration engine. For the thrust chamber assembly of the test article, several configurations of new main injectors, using relatively conventional gas-centered swirl coaxial injector elements, were designed and fabricated. The design and fabrication of these main injectors are described in a companion paper at this JANNAF meeting. New ablative combustion chambers were fabricated based on hardware previously used at NASA for testing at similar size and pressure. An existing oxygen/RP-1 oxidizer-rich subscale preburner injector from a previous NASA-funded program, along with existing and new inter-connecting hot gas duct hardware, were used to supply the oxidizer-rich combustion products to the oxidizer circuit of the main injector of the thrust chamber. Results from independent hot-fire tests of the preburner injector in a combustion chamber with a sonic throat are described in companion papers at this JANNAF conference. The resulting integrated test article - which includes the preburner, inter-connecting hot gas duct, main injector, and ablative combustion chamber - was assembled at Test Stand 116 at the East Test Area of the NASA Marshall Space Flight Center. The test article was well instrumented with static and dynamic pressure, temperature, and acceleration sensors to allow the collected data to be used for

  16. Demonstrations in Solute Transport Using Dyes: Part I. Procedures and Results.

    Science.gov (United States)

    Butters, Greg; Bandaranayake, Wije

    1993-01-01

    Presents the general theory to explain chemical movement in soil. Describes classroom demonstrations with visually stimulating results that show the effects of soil structure, soil texture, soil pH, and soluble organic matter on that movement. (MDH)

  17. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Fifth Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-06-01

    This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 13 advanced-design fuel cell buses and two hydrogen fueling stations. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published four previous reports describing operation of these buses. This report presents new and updated results covering data from January 2015 through December 2015.

  18. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Sixth Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Post, Matthew B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jeffers, Matthew A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-11

    This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 13 advanced-design fuel cell buses and two hydrogen fueling stations. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published five previous reports describing operation of these buses. This report presents new and updated results covering data from January 2016 through December 2016.

  19. Demonstration test on decontamination of contaminated pool water using liquid-solid settling technology with flocculants

    International Nuclear Information System (INIS)

    Aritomi, Masanori; Adachi, Toshihiro; Watanabe, Noriyuki; Tagawa, Akihiro; Hosobuchi, Shigeki; Takanashi, Junko

    2013-01-01

    For the purpose of supplying agricultural water, a stationary purification system for contaminated water had been developed on the basis of the liquid-solid settling technology using flocculants. Two kinds of flocculants had been developed on the basis of preliminary tests: one that compounds iron ferrocyanide and the other that does not. With the use of this system and flocculants, a demonstration test was conducted to apply the decontamination technology on contaminated water in two swimming pools in an elementary school located at Motomiya City, Fukushima Prefecture, Japan. It is proved from the results that both the developed purification system and the flocculants can be established as a practicable decontamination technology for contaminated water: the treatment rate was 10 m 3 /hour and the elimination factor of radioactive materials was higher than 99%. (author)

  20. LEDA RF distribution system design and component test results

    International Nuclear Information System (INIS)

    Roybal, W.T.; Rees, D.E.; Borchert, H.L.; McCarthy, M.; Toole, L.

    1998-01-01

    The 350 MHz and 700 MHz RF distribution systems for the Low Energy Demonstration Accelerator (LEDA) have been designed and are currently being installed at Los Alamos National Laboratory. Since 350 MHz is a familiar frequency used at other accelerator facilities, most of the major high-power components were available. The 700 MHz, 1.0 MW, CW RF delivery system designed for LEDA is a new development. Therefore, high-power circulators, waterloads, phase shifters, switches, and harmonic filters had to be designed and built for this applications. The final Accelerator Production of Tritium (APT) RF distribution systems design will be based on much of the same technology as the LEDA systems and will have many of the RF components tested for LEDA incorporated into the design. Low power and high-power tests performed on various components of these LEDA systems and their results are presented here

  1. Irradiation effects test series test IE-1 test results report

    International Nuclear Information System (INIS)

    Quapp, W.J.; Allison, C.M.; Farrar, L.C.; Mehner, A.S.

    1977-03-01

    The report describes the results of the first programmatic test in the Nuclear Regulatory Commission Irradiation Effects Test Series. This test (IE-1) used four 0.97m long PWR-type fuel rods fabricated from previously irradiated Saxton fuel. The objectives of this test were to evaluate the effect of fuel pellet density on pellet-cladding interaction during a power ramp and to evaluate the influence of the irradiated state of the fuel and cladding on rod behavior during film boiling operation. Data are presented on the behavior of irradiated fuel rods during steady-state operation, a power ramp, and film boiling operation. The effects of as-fabricated gap size, as-fabricated fuel density, rod power, and power ramp rate on pellet-cladding interaction are discussed. Test data are compared with FRAP-T2 computer model predictions, and comments on the consequences of sustained film boiling operation on irradiated fuel rod behavior are provided

  2. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    Science.gov (United States)

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  3. Irradiation effects test series, test IE-5. Test results report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Croucher, D. W.; Yackle, T. R.; Allison, C. M.; Ploger, S. A.

    1978-01-01

    Test IE-5, conducted in the Power Burst Facility at the Idaho National Engineering Laboratory, employed three 0.97-m long pressurized water reactor type fuel rods, fabricated from previously irradiated zircaloy-4 cladding and one similar rod fabricated from unirradiated cladding. The objectives of the test were to evaluate the influence of simulated fission products, cladding irradiation damage, and fuel rod internal pressure on pellet-cladding interaction during a power ramp and on fuel rod behavior during film boiling operation. The four rods were subjected to a preconditioning period, a power ramp to an average fuel rod peak power of 65 kW/m, and steady state operation for one hour at a coolant mass flux of 4880 kg/s-m/sup 2/ for each rod. After a flow reduction to 1800 kg/s-m/sup 2/, film boiling occurred on one rod. Additional flow reductions to 970 kg/s-m/sup 2/ produced film boiling on the three remaining fuel rods. Maximum time in film boiling was 80s. The rod having the highest initial internal pressure (8.3 MPa) failed 10s after the onset of film boiling. A second rod failed about 90s after reactor shutdown. The report contains a description of the experiment, the test conduct, test results, and results from the preliminary postirradiation examination. Calculations using a transient fuel rod behavior code are compared with the test results.

  4. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  5. BNL 703 MHz SRF cryomodule demonstration

    International Nuclear Information System (INIS)

    Burrill, A.; Ben-Zvi, I.; Calaga, R.; Dalesio, L.; Dottavio, T.; Gassner, D.; Hahn, H.; Hoff, L.; Kayran, D.; Kewisch, J.; Lambiase, R.; Lederle, D.; Litvinenko, V.; Mahler, G.; McIntyre, G.

    2009-01-01

    This paper will present the preliminary results of the testing of the 703 MHz SRF cryomodule designed for use in the ampere class ERL under construction at Brookhaven National Laboratory. The preliminary cavity tests, carried out at Thomas Jefferson Laboratory, demonstrated cavity performance of 20 MV/m with a Qo of 1 x 10 10 , results we expect to reproduce in the horizontal configuration. This test of the entire string assembly will allow us to evaluate all of the additional cryomodule components not previously tested in the VTA and will prepare us for our next milestone test which will be delivery of electrons from our injector through the cryomodule to the beam dump. This will also be the first demonstration of an accelerating cavity designed for use in an ampere class ERL, a key development which holds great promise for future machines

  6. Test results of HTTR control system

    International Nuclear Information System (INIS)

    Motegi, Toshihiro; Iigaki, Kazuhiko; Saito, Kenji; Sawahata, Hiroaki; Hirato, Yoji; Kondo, Makoto; Shibutani, Hideki; Ogawa, Satoru; Shinozaki, Masayuki; Mizushima, Toshihiko; Kawasaki, Kozo

    2006-06-01

    The plant control performance of the IHX helium flow rate control system, the PPWC helium flow rate control system, the secondary helium flow rate control system, the inlet temperature control system, the reactor power control system and the outlet temperature control system of the HTTR are obtained through function tests and power-up tests. As the test results, the control systems show stable control response under transient condition. Both of inlet temperature control system and reactor power control system shows stable operation from 30% to 100%, respectively. This report describes the outline of control systems and test results. (author)

  7. Subsonic Glideback Rocket Demonstrator Flight Testing

    Science.gov (United States)

    DeTurris, Dianne J.; Foster, Trevor J.; Barthel, Paul E.; Macy, Daniel J.; Droney, Christopher K.; Talay, Theodore A. (Technical Monitor)

    2001-01-01

    For the past two years, Cal Poly's rocket program has been aggressively exploring the concept of remotely controlled, fixed wing, flyable rocket boosters. This program, embodied by a group of student engineers known as Cal Poly Space Systems, has successfully demonstrated the idea of a rocket design that incorporates a vertical launch pattern followed by a horizontal return flight and landing. Though the design is meant for supersonic flight, CPSS demonstrators are deployed at a subsonic speed. Many steps have been taken by the club that allowed the evolution of the StarBooster prototype to reach its current size: a ten-foot tall, one-foot diameter, composite material rocket. Progress is currently being made that involves multiple boosters along with a second stage, third rocket.

  8. Safety demonstration tests on thermal decomposition of nitrated solvent with nitric acid in nuclear fuel reprocessing plants. Contract research

    International Nuclear Information System (INIS)

    Tsukamoto, Michio; Takada, Junichi; Koike, Tadao; Watanabe, Koji; Uchiyama, Gunzou; Nishio, Gunji; Murata, Mikio

    2001-03-01

    The demonstration tests were conducted to investigate the safety of the ventilation system and integrity of the HEPA filters under the design basis accident (DBA) of the evaporator in the reprocessing plants. The tests were carried out by heating organic solvent (TBP/n- dodecane) mixed with nitric acid in a sealed vessel. It was possible to cause an explosive decomposition of TBP-complex formed by nitration of the solvent with nitric acid. The following was obtained by the analysis of the experimental results of the tests. From derivation by the experimental method, data on the maximum mass release rate and the maximum energy release rate in the explosion, as the solvent of 1 [kg] spouted out by the thermal decomposition, were obtained. They were 0.59 [kg/s] and 3240.3 [kJ/kg·s] respectively. The influence given on the cell ventilation system by this explosion was small and it was demonstrated that the safety of the HEPA filters could be secured. (author)

  9. Results of repeat tracer tests at Ohaaki, NZ

    International Nuclear Information System (INIS)

    McCabe, W.J.; Morris, C.

    1995-01-01

    During 20 years of tracer testing at Ohaaki a number of wells have been used more than once as tracer injection sites. In studying the various responses obtained it has been necessary to consider variations in the experimental test conditions before making comparisons which relate to field conditions. Some very significant changes have occurred in the field hydrology in recent years and water flow speeds as high as those encountered at Wairakei have been demonstrated. (author). 4 refs., 2 tabs., 10 figs

  10. Postirradiation examination of ORR demonstration elements

    International Nuclear Information System (INIS)

    Snelgrove, J.L.; Copeland, G.L.; Hofman, G.L.

    1991-01-01

    Postirradiation examinations of selected U 3 Si 2 fuel elements fabricated by B and W, CERCA, and NUKEM and irradiated during the whole core demonstration in the Oak Ridge Research Reactor are nearing completion. The results of all tests have shown the demonstration fuel elements, produced under production-line conditions, to have performed in the excellent manner expected from earlier tests of miniature fuel plates and full-sized elements. (orig.)

  11. Irradiation Effects Test Series: Test IE-2. Test results report

    International Nuclear Information System (INIS)

    Allison, C.M.; Croucher, D.W.; Ploger, S.A.; Mehner, A.S.

    1977-08-01

    The report describes the results of a test using four 0.97-m long PWR-type fuel rods with differences in diametral gap and cladding irradiation. The objective of this test was to provide information about the effects of these differences on fuel rod behavior during quasi-equilibrium and film boiling operation. The fuel rods were subjected to a series of preconditioning power cycles of less than 30 kW/m. Rod powers were then increased to 68 kW/m at a coolant mass flux of 4900 kg/s-m 2 . After one hour at 68 kW/m, a power-cooling-mismatch sequence was initiated by a flow reduction at constant power. At a flow of 2550 kg/s-m 2 , the onset of film boiling occurred on one rod, Rod IE-011. An additional flow reduction to 2245 kg/s-m 2 caused the onset of film boiling on the remaining three rods. Data are presented on the behavior of fuel rods during quasiequilibrium and during film boiling operation. The effects of initial gap size, cladding irradiation, rod power cycling, a rapid power increase, and sustained film boiling are discussed. These discussions are based on measured test data, preliminary postirradiation examination results, and comparisons of results with FRAP-T3 computer model calculations

  12. Summary of CCTF test results

    International Nuclear Information System (INIS)

    Iguchi, T.; Murao, Y.; Sugimoto, J.; Akimoto, H.; Okubo, T.; Hojo, T.

    1987-01-01

    Conservatism of current safety analysis was assessed by comparing the predicted result with cylindrical core test facility (CCTF) test result performed at Japan Atomic Energy Research Institute. WREM code was selected for the assessment. The overall conservatism of the WREM code on the peak clad temperature prediction was confirmed against CCTF evaluation model (EM) test which simulated the typical initial and boundary conditions in the safety evaluation analysis. WREM code predicted the reasonable core boundary conditions and the conservatism of the code came mainly from core calculation. The conservatism of the WREM code against CCTF data could be attributed to the following three points: (1) no horizontal mixing assumption between subchannels at each elevation; (2) no modeling on heat transfer enhancement caused by the radial core power profile; and (3) conservative heat transfer correlations in the code

  13. Cone Penetrometer Load Cell Temperature and Radiation Testing Results

    Energy Technology Data Exchange (ETDEWEB)

    Follett, Jordan R.

    2013-08-28

    This report summarizes testing activities performed at the Pacific Northwest National Laboratory to verify the cone penetrometer load cell can withstand the tank conditions present in 241-AN-101 and 241-AN-106. The tests demonstrated the load cell device will operate under the elevated temperature and radiation levels expected to be encountered during tank farm deployment of the device.

  14. Drop Test Results of CRDM under Seismic Loads

    International Nuclear Information System (INIS)

    Choi, Myoung-Hwan; Cho, Yeong-Garp; Kim, Gyeong-Ho; Sun, Jong-Oh; Huh, Hyung

    2016-01-01

    This paper describes the test results to demonstrate the drop performance of CRDM under seismic loads. The top-mounted CRDM driven by the stepping motor for Jordan Research and Training Reactor (JRTR) has been developed in KAERI. The CRDM for JRTR has been optimized by the design improvement based on that of the HANARO. It is necessary to verify the drop performance under seismic loads such as operating basis earthquake (OBE) and safe shutdown earthquake (SSE). Especially, the CAR drop times are important data for the safety analysis. confirm the drop performance under seismic loads. The delay of drop time at Rig no. 2 due to seismic loads is greater than that at Rig no. 3. The total pure drop times under seismic loads are estimated as 1.169 and 1.855, respectively

  15. Drop Test Results of CRDM under Seismic Loads

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Myoung-Hwan; Cho, Yeong-Garp; Kim, Gyeong-Ho; Sun, Jong-Oh; Huh, Hyung [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    This paper describes the test results to demonstrate the drop performance of CRDM under seismic loads. The top-mounted CRDM driven by the stepping motor for Jordan Research and Training Reactor (JRTR) has been developed in KAERI. The CRDM for JRTR has been optimized by the design improvement based on that of the HANARO. It is necessary to verify the drop performance under seismic loads such as operating basis earthquake (OBE) and safe shutdown earthquake (SSE). Especially, the CAR drop times are important data for the safety analysis. confirm the drop performance under seismic loads. The delay of drop time at Rig no. 2 due to seismic loads is greater than that at Rig no. 3. The total pure drop times under seismic loads are estimated as 1.169 and 1.855, respectively.

  16. Test results on prototype 50-kA conductors for tokamak induction heating coils

    International Nuclear Information System (INIS)

    Wollan, J.J.; Williamson, K.D. Jr.; Turck, B.

    1979-01-01

    Fabricability of a very large, 50-kA superconducting cable has been demonstrated. Test results of critical current and stability measurements are presented. The design critical current of 55 kA at 7 T was met. The recovery current was degraded as a result of the expectedly poor insulation system. Energy loss measurements on prototype advanced mixed matrix conductors, which will be incorporated into a second prototype cable, are presented

  17. Advanced Simulation Capability for Environmental Management - Current Status and Phase II Demonstration Results - 13161

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, Roger R.; Flach, Greg [Savannah River National Laboratory, Savannah River Site, Bldg 773-43A, Aiken, SC 29808 (United States); Freshley, Mark D.; Freedman, Vicky; Gorton, Ian [Pacific Northwest National Laboratory, MSIN K9-33, P.O. Box 999, Richland, WA 99352 (United States); Dixon, Paul; Moulton, J. David [Los Alamos National Laboratory, MS B284, P.O. Box 1663, Los Alamos, NM 87544 (United States); Hubbard, Susan S.; Faybishenko, Boris; Steefel, Carl I.; Finsterle, Stefan [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, MS 50B-4230, Berkeley, CA 94720 (United States); Marble, Justin [Department of Energy, 19901 Germantown Road, Germantown, MD 20874-1290 (United States)

    2013-07-01

    The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Tool-sets and High-Performance Computing (HPC) Multi-process Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, tool-sets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial tool-sets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  18. Advanced Simulation Capability for Environmental Management - Current Status and Phase II Demonstration Results - 13161

    International Nuclear Information System (INIS)

    Seitz, Roger R.; Flach, Greg; Freshley, Mark D.; Freedman, Vicky; Gorton, Ian; Dixon, Paul; Moulton, J. David; Hubbard, Susan S.; Faybishenko, Boris; Steefel, Carl I.; Finsterle, Stefan; Marble, Justin

    2013-01-01

    The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Tool-sets and High-Performance Computing (HPC) Multi-process Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, tool-sets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial tool-sets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  19. Climax granite test results

    Energy Technology Data Exchange (ETDEWEB)

    Ramspott, L.D.

    1980-01-15

    The Lawrence Livermore Laboratory (LLL), as part of the Nevada Nuclear Waste Storage Investigations (NNWSI) program, is carrying out in situ rock mechanics testing in the Climax granitic stock at the Nevada Test Site (NTS). This summary addresses only those field data taken to date that address thermomechanical modeling for a hard-rock repository. The results to be discussed include thermal measurements in a heater test that was conducted from October 1977 through July 1978, and stress and displacement measurements made during and after excavation of the canister storage drift for the Spent Fuel Test (SFT) in the Climax granite. Associated laboratory and field measurements are summarized. The rock temperature for a given applied heat load at a point in time and space can be adequately modeled with simple analytic calculations involving superposition and integration of numerous point source solutions. The input, for locations beyond about a meter from the source, can be a constant thermal conductivity and diffusivity. The value of thermal conductivity required to match the field data is as much as 25% different from laboratory-measured values. Therefore, unless we come to understand the mechanisms for this difference, a simple in situ test will be required to obtain a value for final repository design. Some sensitivity calculations have shown that the temperature field is about ten times more sensitive to conductivity than to diffusivity under the test conditions. The orthogonal array was designed to detect anisotropy. After considering all error sources, anisotropic efforts in the thermal field were less than 5 to 10%.

  20. Thermal performance test of hot gas ducts of helium engineering demonstration loop (HENDEL)

    International Nuclear Information System (INIS)

    Hishida, Makoto; Kunitomi, Kazuhiko; Ioka, Ikuo; Umenishi, Koji; Kondo, Yasuo; Tanaka, Toshiyuki; Shimomura, Hiroaki

    1984-01-01

    A hot gas duct provided with internal thermal insulation is supposed to be used for an experimental very high-temperature gas-cooled reactor (VHTR) which has been developed by the Japan Atomic Energy Research Institute (JAERI). This type of hot gas duct has not been used so far in industrial facilities, and only a couple of tests on such a large-scale model of hot gas duct have been conducted. The present test was to investigate the thermal performance of the hot gas ducts which are installed as parts of a helium engineering demonstration loop (HENDEL) of JAERI. Uniform temperature and heat flux distributions at the surface of the duct were observed, the experimental correlation being obtained for the effective thermal conductivity of the internal thermal insulation layer. The measured temperature distribution of the pressure tube was in good agreement with the calculation by a TRUMP heat transfer computer code. The temperature distribution of the inner tube of VHTR hot gas duct was evaluated, and no hot spot was detected. These results would be very valuable for the design and development of VHTR. (author)

  1. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  2. 99m-Tc-IDA scintigraphic demonstrability of biliary elements and liver function tests in hepatobiliary diseases

    International Nuclear Information System (INIS)

    Kim, C.Y.; Bahk, Y.W.

    1982-01-01

    In the present communication, the results will be reported on a clinical study of how well scintigraphic visualization of the hepatobiliary elements and several commonly used clinical liver function tests correlate each other in various diseases of the hepatobiliary system. The demonstrability of the biliary tract, gallblader (GB) and duodenum was rather closely paralleled to serum bilirubin level and less closely to alkaline phosphatase and rather poorly to SGOT and SGPT. The biliary tree could not be visualized scintigraphically when bilirubin exceeded 10 mg/dl

  3. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report

  4. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 5 discusses the following topics: Lower Cutting System Test Results and Analysis Report; NFBC Loading System Test Results and Analysis Report; Robotic Bridge Transporter Test Results and Analysis Report; RM-10A Remotec Manipulator Test Results and Analysis Report; and Manipulator Transporter Test Results and Analysis Report

  5. Abnormal Cervical Cancer Screening Test Results

    Science.gov (United States)

    ... AQ FREQUENTLY ASKED QUESTIONS FAQ187 GYNECOLOGIC PROBLEMS Abnormal Cervical Cancer Screening Test Results • What is cervical cancer screening? • What causes abnormal cervical cancer screening test ...

  6. Irradiation Effects Test Series: Test IE-3. Test results report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Farrar, L. C.; Allison, C. M.; Croucher, D. W.; Ploger, S. A.

    1977-10-01

    The objectives of the test reported were to: (a) determine the behavior of irradiated fuel rods subjected to a rapid power increase during which the possibility of a pellet-cladding mechanical interaction failure is enhanced and (b) determine the behavior of these fuel rods during film boiling following this rapid power increase. Test IE-3 used four 0.97-m long pressurized water reactor type fuel rods fabricated from previously irradiated fuel. The fuel rods were subjected to a preconditioning period, followed by a power ramp to 69 kW/m at a coolant mass flux of 4920 kg/s-m/sup 2/. After a flow reduction to 2120 kg/s-m/sup 2/, film boiling occurred on the fuel rods. One rod failed approximately 45 seconds after the reactor was shut down as a result of cladding embrittlement due to extensive cladding oxidation. Data are presented on the behavior of these irradiated fuel rods during steady-state operation, the power ramp, and film boiling operation. The effects of a power ramp and power ramp rates on pellet-cladding interaction are discussed. Test data are compared with FRAP-T3 computer model calculations and data from a previous Irradiation Effects test in which four irradiated fuel rods of a similar design were tested. Test IE-3 results indicate that the irradiated state of the fuel rods did not significantly affect fuel rod behavior during normal, abnormal (power ramp of 20 kW/m per minute), and accident (film boiling) conditions.

  7. Airborne Turbulence Detection and Warning ACLAIM Flight Test Results

    Science.gov (United States)

    Hannon, Stephen M.; Bagley, Hal R.; Soreide, Dave C.; Bowdle, David A.; Bogue, Rodney K.; Ehernberger, L. Jack

    1999-01-01

    The Airborne Coherent Lidar for Advanced Inflight Measurements (ACLAIM) is a NASA/Dryden-lead program to develop and demonstrate a 2 micrometers pulsed Doppler lidar for airborne look-ahead turbulence detection and warning. Advanced warning of approaching turbulence can significantly reduce injuries to passengers and crew aboard commercial airliners. The ACLAIM instrument is a key asset to the ongoing Turbulence component of NASA's Aviation Safety Program, aimed at reducing the accident rate aboard commercial airliners by a factor of five over the next ten years and by a factor of ten over the next twenty years. As well, the advanced turbulence warning capability can prevent "unstarts" in the inlet of supersonic aircraft engines by alerting the flight control computer which then adjusts the engine to operate in a less fuel efficient, and more turbulence tolerant, mode. Initial flight tests of the ACLAIM were completed in March and April of 1998. This paper and presentation gives results from these initial flights, with validated demonstration of Doppler lidar wind turbulence detection several kilometers ahead of the aircraft.

  8. Results of data base management system parameterized performance testing related to GSFC scientific applications

    Science.gov (United States)

    Carchedi, C. H.; Gough, T. L.; Huston, H. A.

    1983-01-01

    The results of a variety of tests designed to demonstrate and evaluate the performance of several commercially available data base management system (DBMS) products compatible with the Digital Equipment Corporation VAX 11/780 computer system are summarized. The tests were performed on the INGRES, ORACLE, and SEED DBMS products employing applications that were similar to scientific applications under development by NASA. The objectives of this testing included determining the strength and weaknesses of the candidate systems, performance trade-offs of various design alternatives and the impact of some installation and environmental (computer related) influences.

  9. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  10. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan (Revision 2)

    International Nuclear Information System (INIS)

    Sresty, G.C.

    1994-01-01

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 degrees to 95 degrees C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern. This document is a Treatability Study Work Plan for the demonstration program. The document contains a description of the proposed treatability study, background of the EM heating process, description of the field equipment, and demonstration test design

  11. Schizophrenia patients demonstrate a dissociation on declarative and non-declarative memory tests.

    Science.gov (United States)

    Perry, W; Light, G A; Davis, H; Braff, D L

    2000-12-15

    Declarative memory refers to the recall and recognition of factual information. In contrast, non-declarative memory entails a facilitation of memory based on prior exposure and is typically assessed with priming and perceptual-motor sequencing tasks. In this study, schizophrenia patients were compared to normal comparison subjects on two computerized memory tasks: the Word-stem Priming Test (n=30) and the Pattern Sequence Learning Test (n=20). Word-stem Priming includes recall, recognition (declarative) and priming (non-declarative) components of memory. The schizophrenia patients demonstrated an impaired performance on recall of words with relative improvement during the recognition portion of the test. Furthermore, they performed normally on the priming portion of the test. Thus, on tests of declarative memory, the patients had retrieval deficits with intact performance on the non-declarative memory component. The Pattern Sequence Learning Test utilizes a serial reaction time paradigm to assess non-declarative memory. The schizophrenia patients' serial reaction time was significantly slower than that of comparison subjects. However, the patients' rate of acquisition was not different from the normal comparison group. The data suggest that patients with schizophrenia process more slowly than normal, but have an intact non-declarative memory. The schizophrenia patients' dissociation on declarative vs. non-declarative memory tests is discussed in terms of possible underlying structural impairment.

  12. Foothill Transit Battery Electric Bus Demonstration Results: Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-06-28

    This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel and Pomona Valley region of Los Angeles County, California. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory to evaluate its fleet of Proterra BEBs in revenue service. The focus of this evaluation is to compare performance of the BEBs to that of conventional technology and to track progress over time toward meeting performance targets. This project has also provided an opportunity for DOE to conduct a detailed evaluation of the BEBs and charging infrastructure. This is the second report summarizing the results of the BEB demonstration at Foothill Transit and it provides data on the buses from August 2015 through December 2016. Data are provided on a selection of compressed natural gas buses as a baseline comparison.

  13. Demonstration of inherent safety features of HTGRs using the HTTR

    International Nuclear Information System (INIS)

    Tachibana, Yukio; Nakagawa, Shigeaki; Nakazawa, Toshio; Iyoku, Tatsuo

    2004-01-01

    Safety demonstration tests using the High Temperature Engineering Test Reactor (HTTR) are conducted for the purpose of demonstrating inherent safety features of High Temperature Gas-cooled Reactors (HTGRs) quantitatively as well as providing the core and plant transient data for validation of HTGR analysis codes for safety evaluation. The safety demonstration test are divided to the first phase and second phase tests. In the first phase tests, simulation tests of anticipated operational occurrences and anticipated transients without scram (ATWS) are conducted. The second phase tests will simulate accidents such as a depressurization accident (loss of coolant accident). The first phase test simulating reactivity insertion events and coolant flow reduction events stared in FY 2002. Post-test analyses have been conducted to reproduced the test results by using the core and plant dynamics analysis code, ACCORD and Monte Carlo code, MVP. The analysis results agreed fairly well with the test results of a control rod withdrawal test simulating reactivity insertion, and gas circulators trip test simulating coolant flow reduction, at power levels of 50% and 30% of the rated power, respectively. It is shown that improvement of the ACCORD code by taking into consideration vertical and horizontal temperature distribution gives better analysis results in the control rod withdrawal test. The fist phase safety demonstration tests will continue until FY 2005, and the second phase tests are planned to be started in FY 2006. (author)

  14. Electrodril system field test program. Phase II: Task C-1-deep drilling system demonstration. Final report for Phase II: Task C-1

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, P D

    1981-04-01

    The Electrodril Deep Drilling System field test demonstrations were aborted in July 1979, due to connector problems. Subsequent post test analyses concluded that the field replacable connectors were the probable cause of the problems encountered. The designs for both the male and female connectors, together with their manufacturing processes, were subsequently modified, as was the acceptance test procedures. A total of nine male and nine female connectors were manufactured and delivered during the 2nd Quarter 1980. Exhaustive testing was then conducted on each connector as a precursor to formal qualification testing conducted during the month of October 1980, at the Brown Oil Tool test facility located in Houston, Texas. With this report, requirements under Phase II, Task C-1 are satisfied. The report documents the results of the connector qualification test program which was successfully completed October 28, 1980. In general, it was concluded that connector qualification had been achieved and plans are now in progress to resume the field test demonstration program so that Electrodril System performance predictions and economic viability can be evaluated.

  15. Lessons Learned During Cryogenic Optical Testing of the Advanced Mirror System Demonstrators (AMSDs)

    Science.gov (United States)

    Hadaway, James; Reardon, Patrick; Geary, Joseph; Robinson, Brian; Stahl, Philip; Eng, Ron; Kegley, Jeff

    2004-01-01

    Optical testing in a cryogenic environment presents a host of challenges above and beyond those encountered during room temperature testing. The Advanced Mirror System Demonstrators (AMSDs) are 1.4 m diameter, ultra light-weight (mA2), off-axis parabolic segments. They are required to have 250 nm PV & 50 nm RMS surface figure error or less at 35 K. An optical testing system, consisting of an Instantaneous Phase Interferometer (PI), a diffractive null corrector (DNC), and an Absolute Distance Meter (ADM), was used to measure the surface figure & radius-of-curvature of these mirrors at the operational temperature within the X-Ray Calibration Facility (XRCF) at Marshall Space Flight Center (MSFC). The Ah4SD program was designed to improve the technology related to the design, fabrication, & testing of such mirrors in support of NASA s James Webb Space Telescope (JWST). This paper will describe the lessons learned during preparation & cryogenic testing of the AMSDs.

  16. Nevada Test Site-Directed Research, Development, and Demonstration

    International Nuclear Information System (INIS)

    Will Lewis, Compiler

    2006-01-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R and D projects, as presented in this report

  17. Safety demonstration test (SR-3/S1C-3/S2C-3/SF-2) plan using the HTTR. Contract research

    International Nuclear Information System (INIS)

    Nakagawa, Shigeaki; Sakaba, Nariaki; Takamatsu, Kuniyoshi; Takada, Eiji; Tochio, Daisuke; Ohwada, Hiroyuki

    2005-03-01

    Safety demonstration tests using the HTTR are to be conducted from the FY2002 to verify the inherent safety features and to improve the safety design and evaluation technologies for HTGRs, as well as to contribute to not only the commercial HTGRs but also the research and development for the VHTR that is one of the Generation IV reactor candidates. This paper describes the reactivity insertion test (SR-3), the coolant flow reduction test by tripping of gas circulators (S1C-3, S2C-3), and the partial flow loss of coolant test (SF-2) planned in March 2005 with their detailed test method, procedure and results of pre-test analysis. From the analytical results, it was verified that the negative reactivity feedback effect of the core brings the reactor power safely to a stable level without a reactor scram. (author)

  18. Results of the mission profile life test. [for J-series mercury ion engines

    Science.gov (United States)

    Bechtel, R. T.; Trump, G. E.; James, E. L.

    1982-01-01

    Seven J series 30-cm diameter thrusters have been tested in segments of up to 5,070 hr, for 14,541 hr in the Mission Profile Life Test facility. Test results have indicated the basic thruster design to be consistent with the lifetime goal of 15,000 hr at 2-A beam. The only areas of concern identified which appear to require additional verification testing involve contamination of mercury propellant isolators, which may be due to facility constituents, and the ability of specially covered surfaces to contain sputtered material and prevent flake formation. The ability of the SCR, series resonant inverter power processor to operate the J series thruster and autonomous computer control of the thruster/processor system were demonstrated.

  19. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  20. BWR Full Integral Simulation Test (FIST). Phase I test results

    International Nuclear Information System (INIS)

    Hwang, W.S.; Alamgir, M.; Sutherland, W.A.

    1984-09-01

    A new full height BWR system simulator has been built under the Full-Integral-Simulation-Test (FIST) program to investigate the system responses to various transients. The test program consists of two test phases. This report provides a summary, discussions, highlights and conclusions of the FIST Phase I tests. Eight matrix tests were conducted in the FIST Phase I. These tests have investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. Results and governing phenomena of each test have been evaluated and discussed in detail in this report. One of the FIST program objectives is to assess the TRAC code by comparisons with test data. Two pretest predictions made with TRACB02 are presented and compared with test data in this report

  1. Test result communication in primary care: a survey of current practice.

    Science.gov (United States)

    Litchfield, Ian; Bentham, Louise; Lilford, Richard; McManus, Richard J; Hill, Ann; Greenfield, Sheila

    2015-11-01

    The number of blood tests ordered in primary care continues to increase and the timely and appropriate communication of results remains essential. However, the testing and result communication process includes a number of participants in a variety of settings and is both complicated to manage and vulnerable to human error. In the UK, guidelines for the process are absent and research in this area is surprisingly scarce; so before we can begin to address potential areas of weakness there is a need to more precisely understand the strengths and weaknesses of current systems used by general practices and testing facilities. We conducted a telephone survey of practices across England to determine the methods of managing the testing and result communication process. In order to gain insight into the perspectives from staff at a large hospital laboratory we conducted paired interviews with senior managers, which we used to inform a service blueprint demonstrating the interaction between practices and laboratories and identifying potential sources of delay and failure. Staff at 80% of practices reported that the default method for communicating normal results required patients to telephone the practice and 40% of practices required that patients also call for abnormal results. Over 80% had no fail-safe system for ensuring that results had been returned to the practice from laboratories; practices would otherwise only be aware that results were missing or delayed when patients requested results. Persistent sources of missing results were identified by laboratory staff and included sample handling, misidentification of samples and the inefficient system for collating and resending misdirected results. The success of the current system relies on patients both to retrieve results and in so doing alert staff to missing and delayed results. Practices appear slow to adopt available technological solutions despite their potential for reducing the impact of recurring errors in the

  2. The effect of friction on indentation test results

    International Nuclear Information System (INIS)

    Harsono, E; Swaddiwudhipong, S; Liu, Z S

    2008-01-01

    A smooth contact analysis is commonly adopted in simulated indentation. Limited studies have been performed to investigate the possibility of deviation due to this simplification. This study involves the finite element simulation of indentation by conical indenters and the Berkovich family of indenters with three different apex angles of indenter tips of 50°, 60° and 70.3°. Loading curvatures and the ratio of the remaining work done to the total work done of the load-indentation curves resulting from the simulated indentation tests considering friction and smooth contact surfaces were compared and discussed. A wide range of elasto-plastic materials obeying the power law strain hardening model were considered in this study. The results as presented herein demonstrate that the effect of friction on the two essential basic parameters from the load–indentation curves, namely, the loading curvatures and the ratio of the work done, varies depending on both mechanical properties of the target materials and the geometries of the indenter tips adopted in the investigation

  3. Mitigation of tank 241-SY-101 by pump mixing: Results of full-scale testing

    International Nuclear Information System (INIS)

    Stewart, C.W.; Hudson, J.D.; Friley, J.R.; Panisko, F.E.; Antoniak, Z.I.; Irwin, J.J.; Fadeff, J.G.; Efferding, L.F.; Michener, T.E.; Kirch, N.W.

    1994-06-01

    The Full-Scale Mixer Pump Test Program was performed in Hanford Tank 241-SY-101 from February 4 to April 13, 1994, to confirm the long-term operational strategy for flammable gas mitigation and to demonstrate that mixing can control the gas release and waste level. Since its installation on July 3, 1993, the current pump, operating only a few hours per week, has proved capable of mixing the waste sufficiently to release gas continuously instead of in large episodic events. The results of Full-Scale Testing demonstrated that the pump can control gas release and waste level for long-term mitigation, and the four test sequences formed the basis for the long-term operating schedule. The last test sequence, jet penetration tests, showed that the current pump jet creates flow near the tank wall and that it can excavate portions of the bottom sludge layer if run at maximum power. Pump mixing has altered the open-quote normal close-quote configuration of the waste; most of the original nonconvective sludge has been mixed with the supernatant liquid into a mobile convective slurry that has since been maintained by gentle pump operation and does not readily return to sludge

  4. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results. Fourth Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-07-02

    This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 12 advanced-design fuel cell buses and two hydrogen fueling stations. The FCEBs in service at AC Transit are 40-foot, low-floor buses built by Van Hool with a hybrid electric propulsion system that includes a US Hybrid fuel cell power system and EnerDel lithium-based energy storage system. The buses began revenue service in May 2010.

  5. Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project

    International Nuclear Information System (INIS)

    Gong, Chung; Pelfrey, J.R.

    1993-01-01

    The Bentonite Mat Demonstration Project (BMDP) is a field demonstration study to determine the construction/installation requirements, permeability, and subsidence performance characteristics of a composite barrier. The composite barrier will consist of on-site sandy-clay blanketed by a bentonite mat and a flexible High Density Polyethylene (HDPE) liner (also called flexible membrane liner). Construction of one control test pad and three bentonite test pads are planned. The control test pad will be used to establish baseline data. Underneath the composite clay cap is a four feet thick loose sand layer in which cavities will be created by evacuation of sand. The present work provides a mathematical model for the BMDP. The mathematical model will be used to simulate the mechanical and structural responses of the composite clay cap during the testing processes. Based upon engineering experience and technical references, a set of nominal soil parameters have been selected

  6. Surprising results: HIV testing and changes in contraceptive practices among young women in Malawi

    Science.gov (United States)

    Sennott, Christie; Yeatman, Sara

    2015-01-01

    This study uses eight waves of data from the population-based Tsogolo la Thanzi study (2009–2011) in rural Malawi to examine changes in young women’s contraceptive practices, including the use of condoms, non-barrier contraceptive methods, and abstinence, following positive and negative HIV tests. The analysis factors in women’s prior perceptions of their HIV status that may already be shaping their behaviour and separates surprise HIV test results from those that merely confirm what was already believed. Fixed effects logistic regression models show that HIV testing frequently affects the contraceptive practices of young Malawian women, particularly when the test yields an unexpected result. Specifically, women who are surprised to test HIV positive increase their condom use and are more likely to use condoms consistently. Following an HIV negative test (whether a surprise or expected), women increase their use of condoms and decrease their use of non-barrier contraceptives; the latter may be due to an increase in abstinence following a surprise negative result. Changes in condom use following HIV testing are robust to the inclusion of potential explanatory mechanisms including fertility preferences, relationship status, and the perception that a partner is HIV positive. The results demonstrate that both positive and negative tests can influence women’s sexual and reproductive behaviours, and emphasise the importance of conceptualizing of HIV testing as offering new information only insofar as results deviate from prior perceptions of HIV status. PMID:26160156

  7. Test description and preliminary pitot-pressure surveys for Langley Test Technique Demonstrator at Mach 6

    Science.gov (United States)

    Everhart, Joel L.; Ashby, George C., Jr.; Monta, William J.

    1992-01-01

    A propulsion/airframe integration experiment conducted in the NASA Langley 20-Inch Mach 6 Tunnel using a 16.8-in.-long version of the Langley Test Technique Demonstrator configuration with simulated scramjet propulsion is described. Schlieren and vapor screen visualization of the nozzle flow field is presented and correlated with pitot-pressure flow-field surveys. The data were obtained at nominal free-stream conditions of Re = 2.8 x 10 exp 6 and a nominal engine total pressure of 100 psia. It is concluded that pitot-pressure surveys coupled to schlieren and vapor-screen photographs, and oil flows have revealed flow features including vortices, free shear layers, and shock waves occurring in the model flow field.

  8. Results of steel containment vessel model test

    International Nuclear Information System (INIS)

    Luk, V.K.; Ludwigsen, J.S.; Hessheimer, M.F.; Komine, Kuniaki; Matsumoto, Tomoyuki; Costello, J.F.

    1998-05-01

    A series of static overpressurization tests of scale models of nuclear containment structures is being conducted by Sandia National Laboratories for the Nuclear Power Engineering Corporation of Japan and the US Nuclear Regulatory Commission. Two tests are being conducted: (1) a test of a model of a steel containment vessel (SCV) and (2) a test of a model of a prestressed concrete containment vessel (PCCV). This paper summarizes the conduct of the high pressure pneumatic test of the SCV model and the results of that test. Results of this test are summarized and are compared with pretest predictions performed by the sponsoring organizations and others who participated in a blind pretest prediction effort. Questions raised by this comparison are identified and plans for posttest analysis are discussed

  9. Hydraulic Hybrid Parcel Delivery Truck Deployment, Testing & Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Gallo, Jean-Baptiste [Calstart Incorporated, Pasadena, CA (United States)

    2014-03-07

    Although hydraulic hybrid systems have shown promise over the last few years, commercial deployment of these systems has primarily been limited to Class 8 refuse trucks. In 2005, the Hybrid Truck Users Forum initiated the Parcel Delivery Working Group including the largest parcel delivery fleets in North America. The goal of the working group was to evaluate and accelerate commercialization of hydraulic hybrid technology for parcel delivery vehicles. FedEx Ground, Purolator and United Parcel Service (UPS) took delivery of the world’s first commercially available hydraulic hybrid parcel delivery trucks in early 2012. The vehicle chassis includes a Parker Hannifin hydraulic hybrid drive system, integrated and assembled by Freightliner Custom Chassis Corp., with a body installed by Morgan Olson. With funding from the U.S. Department of Energy, CALSTART and its project partners assessed the performance, reliability, maintainability and fleet acceptance of three pre-production Class 6 hydraulic hybrid parcel delivery vehicles using information and data from in-use data collection and on-road testing. This document reports on the deployment of these vehicles operated by FedEx Ground, Purolator and UPS. The results presented provide a comprehensive overview of the performance of commercial hydraulic hybrid vehicles in parcel delivery applications. This project also informs fleets and manufacturers on the overall performance of hydraulic hybrid vehicles, provides insights on how the technology can be both improved and more effectively used. The key findings and recommendations of this project fall into four major categories: -Performance, -Fleet deployment, -Maintenance, -Business case. Hydraulic hybrid technology is relatively new to the market, as commercial vehicles have been introduced only in the past few years in refuse and parcel delivery applications. Successful demonstration could pave the way for additional purchases of hydraulic hybrid vehicles throughout the

  10. IMPROVING LEARNING PROCESS AND STUDENT RESULTS LEARNING TO TUNE-UPMOTORCYCLE USING DEMONSTRATION METHODOF CLASS XI SMA N 1 PLAYEN YEAR STUDY2013/2014

    Directory of Open Access Journals (Sweden)

    Haryono Haryono

    2014-12-01

    Full Text Available This research is to improve the learning process and results in learning a tune-up motorcycle  using the demonstrationmethod of class XI SMA 1 Playen.              This research is a classroom action research (PTK, using the demonstration method.Subyek this study were students of class XI SMA Negeri 1 Playen.Theimplementationofthisstudyusing3cycles,there is a (planning, implementation (actuating, observation (observing, and reflection (reflecting. Collecting data in this study are observations of student learning process and student learning outcomes test data pre-test, postesI, II, III and documentation as a support to the two data. Further observation data based on the observation of student learning just learning the positive process of learning student and test data were analyzed for comparison. Indicators of success in this classroom action research that student learning increases towards positive along with the use of methods of demonstration, is to see an increase from the pre-cycle to end the first cycle, the first cycle to the second cycle and the secondcyclebycycle III.             From the results of this study concluded that the method could improve the demonstration of positive student learning, from the first cycle of 30%, 50% second cycle and third cycle of 80%. Learning is also more effective with students indicated more quickly adapt as a positive activity, especially in terms of increased student asked, noting the test and work on the problems. Demonstration method can improve the learning outcomes  students of class XI SMA 1 Playen as evidenced by an increase in the average yield final test first cycle of 64.09; second cycle of 77.82 and 78.86 for the third cycle. So it proved with the increasing positive student learning canalso improve student learning outcomes.

  11. Development and results of a test program to demonstrate compliance with IEEE STD 384 and R.G. 1.75 electrical separation requirements

    International Nuclear Information System (INIS)

    Eckert, G.P.; Heneberry, E.F.; Walker, F.P.; Konkus, J.F.

    1987-01-01

    The IEEE Std 384-1974, entitled ''Criteria for Separation of Class 1E Equipment and Circuits,'' contains criteria to ensure the independence of redundant Class 1E equipment when designing electrical systems in nuclear plants. The NRC, in R.G. 1.75 Rev. 2, 1978, endorses, with comments, IEEE-384, as the means of achieving independence. One method given in IEEE-384, is that of maintaining a specified separation between components; another method utilizes a combination of separation and barriers. The standard also allows alternative methods to be used when justified by test-based analyses. This paper is a report of a test program undertaken to provide a basis for analysis in the development of alternative methods of achieving separation. The test parameters developed and used, and the results obtained, should prove useful in determining alternative methods of complying with R.G. 1.75 requirements

  12. Superconducting solenoid model magnet test results

    International Nuclear Information System (INIS)

    Carcagno, R.; Dimarco, J.; Feher, S.; Ginsburg, C.M.; Hess, C.; Kashikhin, V.V.; Orris, D.F.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.A.; Terechkine, I.; Tompkins, J.C.; Wokas, T.; Fermilab

    2006-01-01

    Superconducting solenoid magnets suitable for the room temperature front end of the Fermilab High Intensity Neutrino Source (formerly known as Proton Driver), an 8 GeV superconducting H- linac, have been designed and fabricated at Fermilab, and tested in the Fermilab Magnet Test Facility. We report here results of studies on the first model magnets in this program, including the mechanical properties during fabrication and testing in liquid helium at 4.2 K, quench performance, and magnetic field measurements. We also describe new test facility systems and instrumentation that have been developed to accomplish these tests

  13. Superconducting solenoid model magnet test results

    Energy Technology Data Exchange (ETDEWEB)

    Carcagno, R.; Dimarco, J.; Feher, S.; Ginsburg, C.M.; Hess, C.; Kashikhin, V.V.; Orris, D.F.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.A.; Terechkine, I.; /Fermilab

    2006-08-01

    Superconducting solenoid magnets suitable for the room temperature front end of the Fermilab High Intensity Neutrino Source (formerly known as Proton Driver), an 8 GeV superconducting H- linac, have been designed and fabricated at Fermilab, and tested in the Fermilab Magnet Test Facility. We report here results of studies on the first model magnets in this program, including the mechanical properties during fabrication and testing in liquid helium at 4.2 K, quench performance, and magnetic field measurements. We also describe new test facility systems and instrumentation that have been developed to accomplish these tests.

  14. On-line reactor building integrity testing at Gentilly-2 (summary of results 1987-1994)

    International Nuclear Information System (INIS)

    Collins, N.; Lafreniere, P.

    1994-01-01

    In 1987, Hydro-0uebec embarked on an ambitious development program to provide the Gentilly-2 Nuclear Power Station with an effective and practical Reactor Building Containment integrity Test (CIT). In October 1992, the inaugural low pressure (3 kPa(g) nominal) CIT at 100% F.P was performed. The test was conclusive and the CIT was declared In-Service for containment integrity verification on-line. Five subsequent CITs performed in 1993 and 1994 have demonstrated the expected leak rate results and good reliability. The outstanding feature of the CITs is the demonstrated accurary of better than 5% of the measured leak rate. The CIT was developed with the primary goal of demonstrating 'overall' containment availability. Specifically it was designed to detect a 25 mm. diameter leak or hole in the Reactor Building. However, the remarkable CIT accuracy allows reliable detection of a 2 mm. hole. The Gentilly-2 CIT is an innovative approach based on the Temperature Compensation Method (TCM) which uses a reference volume composed of an extensive tubular network of several different diameters. This eliminates the need to track numerous temperature points. A second independent tubular network includes numerous humidity sampling points, thereby enabling the mearurernent of minute pressure variations inside the Reactor Building, independant of the spatial and temporal humidity behaviour. This Gentilly-2 TOM System has been demonstrated to work at both high and low test pressures. The GentiIly-2 design allows the CIT to be performed at a nominal 3 kPa(g) test pressure during a 12-hour period (28 hours total with alignment time) with the reactor at full power. The traditional Reactor Building Pressure Test (RBPT) is typically performed at high pressure (124 kPa(g) in a 5-day critical path window (7 days total with alignment time) during an annual shutdown

  15. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  16. Ten Year Operating Test Results and Post-Test Analysis of a 1/10 Segment Stirling Sodium Heat Pipe, Phase III

    Science.gov (United States)

    Rosenfeld, John, H; Minnerly, Kenneth, G; Dyson, Christopher, M.

    2012-01-01

    High-temperature heat pipes are being evaluated for use in energy conversion applications such as fuel cells, gas turbine re-combustors, Stirling cycle heat sources; and with the resurgence of space nuclear power both as reactor heat removal elements and as radiator elements. Long operating life and reliable performance are critical requirements for these applications. Accordingly, long-term materials compatibility is being evaluated through the use of high-temperature life test heat pipes. Thermacore, Inc., has carried out a sodium heat pipe 10-year life test to establish long-term operating reliability. Sodium heat pipes have demonstrated favorable materials compatibility and heat transport characteristics at high operating temperatures in air over long time periods. A representative one-tenth segment Stirling Space Power Converter heat pipe with an Inconel 718 envelope and a stainless steel screen wick has operated for over 87,000 hr (10 yr) at nearly 700 C. These life test results have demonstrated the potential for high-temperature heat pipes to serve as reliable energy conversion system components for power applications that require long operating lifetime with high reliability. Detailed design specifications, operating history, and post-test analysis of the heat pipe and sodium working fluid are described.

  17. Legal provisions governing the acknowledgment of test results

    International Nuclear Information System (INIS)

    Strecker, A.

    1982-01-01

    The legal provisions governing the acknowledgment of test results are most frequently applied by administrative orders (design and qualification approvals or specimen testing and approval) and are thus claimable and voidable in accordance with general administrative law. The acknowledgment of test certificates requires a legal basis. Test results, however, can be acknowledged also by administrative bodies. Recently, the Federal Government began to delegate more of its legal authority in this field to private institutions, allowing test results to be acknowledged and test certificates to be issued by government controlled private institutions. (orig.) [de

  18. Stirling cryocooler test results and design model verification

    International Nuclear Information System (INIS)

    Shimko, M.A.; Stacy, W.D.; McCormick, J.A.

    1990-01-01

    This paper reports on progress in developing a long-life Stirling cycle cryocooler for space borne applications. It presents the results from tests on a preliminary breadboard version of the cryocooler used to demonstrate the feasibility of the technology and to validate the regenerator design code used in its development. This machine achieved a cold-end temperature of 65 K while carrying a 1/2 Watt cooling load. The basic machine is a double-acting, flexure-bearing, split Stirling design with linear electromagnetic drives for the expander and compressors. Flat metal diaphragms replace pistons for both sweeping and sealing the machine working volumes. In addition, the double-acting expander couples to a laminar-channel counterflow recuperative heat exchanger for regeneration. A PC compatible design code was developed for this design approach that calculates regenerator loss including heat transfer irreversibilities, pressure drop, and axial conduction in the regenerator walls

  19. Manufacturing of cells and stacks for SOFC development, test and demonstration projects and SOFC hotbox design development

    Energy Technology Data Exchange (ETDEWEB)

    2008-09-15

    The purpose of this project is to support the continued SOFC development through manufacturing process optimization and manufacturing of SOFC cells and stacks. These cells and stacks will serve as a necessary base for the development activities and for the establishment of a number of test and demonstration activities. The manufacture will also help provide operating experience and reduce manufacturing cost. Another main focus of the manufacturing is to assure technical improvements and reliability. It is imperative to the eventual success of the technology that test and demonstration is carried out in the pre-market conditions that will exist for the next years in the three market segments targeted by TOFC (Distributed generation, micro CHP and APU incl. marine APU). Finally, the project also includes development activities focusing on the stack-system interface (hotbox design development) and on dealing with transients and start up and shut down times, which is of particular importance for APU and micro CHP applications. Three topics are addressed:1) Cell manufacture, including production development, capacity lift and manuf. of cells for test and demonstration; 2) Stack manufacture and test, including a test facility, stack manuf. and test of stacks in a system at HCV; 3) Hotbox design development, including design, prototype construction and testing. The progress of this project is documented. Major achievements are successful manufacture of adequate amounts of cells and stacks according to the application. Furthermore significant over-performance in design, construction and test of a methanol based hotbox prototype as well as publication of this. (au)

  20. Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

    Science.gov (United States)

    Polzin, K. A.; Pearson, J. B.; Webster, K.; Godfoy, T. J.; Bossard, J. A.

    2013-01-01

    Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency

  1. FY16 Status of Immersion Phased Array Ultrasonic Probe Development and Performance Demonstration Results for Under Sodium Viewing

    International Nuclear Information System (INIS)

    Diaz, Aaron A.; Chamberlin, Clyde E.; Edwards, Matthew K.; Hagge, Tobias J.; Hughes, Michael S.; Larche, Michael R.; Mathews, Royce A.; Neill, Kevin J.; Prowant, Matthew S.

    2016-01-01

    This section of the Joint summary technical letter report (TLR) describes work conducted at the Pacific Northwest National Laboratory (PNNL) during FY 2016 (FY16) on the under-sodium viewing (USV) PNNL project 58745, work package AT-16PN230102. This section of the TLR satisfies PNNL's M3AT-16PN2301025 milestone and is focused on summarizing the design, development, and evaluation of two different phased-array ultrasonic testing (PA-UT) probe designs - a two-dimensional (2D) matrix phased-array probe, and two one-dimensional (1D) linear array probes, referred to as serial number 4 (SN4) engineering test units (ETUs). The 2D probe is a pulse-echo (PE), 32x2, 64-element matrix phased-array ETU. The 1D probes are 32x1 element linear array ETUs. This TLR also provides the results from a performance demonstration (PD) of in-sodium target detection trials at 260°C using both probe designs. This effort continues the iterative evolution supporting the longer term goal of producing and demonstrating a pre-manufacturing prototype ultrasonic probe that possesses the fundamental performance characteristics necessary to enable the development of a high-temperature sodium-cooled fast reactor (SFR) inspection system for in-sodium detection and imaging.

  2. FY16 Status of Immersion Phased Array Ultrasonic Probe Development and Performance Demonstration Results for Under Sodium Viewing

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, Aaron A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chamberlin, Clyde E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Edwards, Matthew K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hagge, Tobias J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, Michael S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Larche, Michael R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mathews, Royce A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Neill, Kevin J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Prowant, Matthew S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-31

    This section of the Joint summary technical letter report (TLR) describes work conducted at the Pacific Northwest National Laboratory (PNNL) during FY 2016 (FY16) on the under-sodium viewing (USV) PNNL project 58745, work package AT-16PN230102. This section of the TLR satisfies PNNL’s M3AT-16PN2301025 milestone and is focused on summarizing the design, development, and evaluation of two different phased-array ultrasonic testing (PA-UT) probe designs—a two-dimensional (2D) matrix phased-array probe, and two one-dimensional (1D) linear array probes, referred to as serial number 4 (SN4) engineering test units (ETUs). The 2D probe is a pulse-echo (PE), 32×2, 64-element matrix phased-array ETU. The 1D probes are 32×1 element linear array ETUs. This TLR also provides the results from a performance demonstration (PD) of in-sodium target detection trials at 260°C using both probe designs. This effort continues the iterative evolution supporting the longer term goal of producing and demonstrating a pre-manufacturing prototype ultrasonic probe that possesses the fundamental performance characteristics necessary to enable the development of a high-temperature sodium-cooled fast reactor (SFR) inspection system for in-sodium detection and imaging.

  3. Milestone Report - Complete New Adsorbent Materials for Marine Testing to Demonstrate 4.5 g-U/kg Adsorbent

    Energy Technology Data Exchange (ETDEWEB)

    Janke, Christopher James [ORNL; Das, Sadananda [ORNL; Oyola, Yatsandra [ORNL; Mayes, Richard T. [ORNL; Saito, Tomonori [ORNL; Brown, Suree [ORNL; Gill, Gary [PNNL; Kuo, Li-Jung [PNNL; Wood, Jordana [PNNL

    2014-08-01

    This report describes work on the successful completion of Milestone M2FT-14OR03100115 (8/20/2014) entitled, “Complete new adsorbent materials for marine testing to demonstrate 4.5 g-U/kg adsorbent”. This effort is part of the Seawater Uranium Recovery Program, sponsored by the U.S. Department of Energy, Office of Nuclear Energy, and involved the development of new adsorbent materials at the Oak Ridge National Laboratory (ORNL) and marine testing at the Pacific Northwest National Laboratory (PNNL). ORNL has recently developed two new families of fiber adsorbents that have demonstrated uranium adsorption capacities greater than 4.5 g-U/kg adsorbent after marine testing at PNNL. One adsorbent was synthesized by radiation-induced graft polymerization of itaconic acid and acrylonitrile onto high surface area polyethylene fibers followed by amidoximation and base conditioning. This fiber showed a capacity of 4.6 g-U/kg adsorbent in marine testing at PNNL. The second adsorbent was prepared by atom-transfer radical polymerization of t-butyl acrylate and acrylonitrile onto halide-functionalized round fibers followed by amidoximation and base hydrolysis. This fiber demonstrated uranium adsorption capacity of 5.4 g-U/kg adsorbent in marine testing at PNNL.

  4. Results from the CLIC X-Band Structure Test Program at NLCTA

    International Nuclear Information System (INIS)

    Adolphsen, C.

    2009-01-01

    As part of a SLAC-CERN-KEK collaboration on high gradient X-band structure research, several prototype structures for the CLIC linear collider study have been tested using two of the high power (300 MW) X-band rf stations in the NLCTA facility at SLAC. These structures differ in terms of their fabrication (brazed disks and clamped quadrants), gradient profile (amount by which the gradient increases along the structure, which optimizes efficiency and maximizes sustainable gradient) and HOM damping (use of slots or waveguides to rapidly dissipate dipole mode energy). The CLIC goal in the next few years is to demonstrate the feasibility of a CLIC-ready baseline design and to investigate alternatives that could increase efficiency. This paper summarizes the high gradient test results from NLCTA in support of this effort.

  5. Remote Sampler Demonstration Isolok Configuration Test

    International Nuclear Information System (INIS)

    Kelly, Steve E.

    2016-01-01

    The accuracy and precision of a new Isolok sampler configuration was evaluated using a recirculation flow loop. The evaluation was performed using two slurry simulants of Hanford high-level tank waste. Through testing, the capability of the Isolok sampler was evaluated. Sample concentrations were compared to reference samples that were simultaneously collected by a two-stage Vezin sampler. The capability of the Isolok sampler to collect samples that accurately reflect the contents in the test loop improved – biases between the Isolok and Vezin samples were greatly reduce for fast settling particles.

  6. Remote Sampler Demonstration Isolok Configuration Test

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Steve E. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2016-06-08

    The accuracy and precision of a new Isolok sampler configuration was evaluated using a recirculation flow loop. The evaluation was performed using two slurry simulants of Hanford high-level tank waste. Through testing, the capability of the Isolok sampler was evaluated. Sample concentrations were compared to reference samples that were simultaneously collected by a two-stage Vezin sampler. The capability of the Isolok sampler to collect samples that accurately reflect the contents in the test loop improved – biases between the Isolok and Vezin samples were greatly reduce for fast settling particles.

  7. Test results for fuel cell operation on anaerobic digester gas

    Science.gov (United States)

    Spiegel, R. J.; Preston, J. L.

    EPA, in conjunction with ONSI, embarked on a project to define, design, test, and assess a fuel cell energy recovery system for application at anaerobic digester waste water (sewage) treatment plants. Anaerobic digester gas (ADG) is produced at these plants during the process of treating sewage anaerobically to reduce solids. ADG is primarily comprised of methane (57-66%), carbon dioxide (33-39%), nitrogen (1-10%), and a small amount of oxygen (sulfur-bearing compounds (principally hydrogen sulfide) and halogen compounds (chlorides). The project has addressed two major issues: development of a cleanup system to remove fuel cell contaminants from the gas and testing/assessing of a modified ONSI PC25 C fuel cell power plant operating on the cleaned, but dilute, ADG. Results to date demonstrate that the ADG fuel cell power plant can, depending on the energy content of the gas, produce electrical output levels close to full power (200 kW) with measured air emissions comparable to those obtained by a natural gas fuel cell. The cleanup system results show that the hydrogen sulfide levels are reduced to below 10 ppbv and halides to approximately 30 ppbv.

  8. In Situ Vitrification: Recent test results for a contaminated soil melting process

    International Nuclear Information System (INIS)

    Buelt, J.L.; Timmerman, C.L.; Westsik, J.H. Jr.

    1988-06-01

    In Situ Vitrification (ISV) is being developed at Pacific Northwest Laboratory for the Department of Energy and other clients for the stabilization of soils and sludges contaminated with radioactive and hazardous chemical wastes. ISV is a process that immobilizes contaminated soil in place by converting it to a durable glass and crystalline product that is similar to obsidian. In June 1987, a large-scale test of the process was completed at a transuranic- contaminated soil site. This constituted the first full-scale demonstration of the ISV process at an actual site. This paper summarizes the preliminary results of this test and describes the processes' potential adaptation to radioactive and hazardous chemical waste contaminated soils. 10 refs., 10 figs

  9. Intertechnology Corporation proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-09-01

    This report has three major parts. The first of these derives the requirements for the Test and Evaluation plan from the System Level Plan which is summarized in Section II. The second part contains the proposed plan to fill these requirements and includes hardware and software recommendations as well as procedures and management considerations. Primary emphasis has been given to the remote site because this is the area in which the commercial part of the demonstration is most unique. Finally, some pre-demonstration activities are described. The pilot program is intended to resolve a number of issues which arose in the course of the T and E plan. These relate to choice of scan frequencies, compression algorithms, etc. It is also intended to confirm performance and cost effectiveness of the site data collection package. The base line measurements of attitudes, etc. provide a reference mark against which one can measure the non-technical effectiveness of the demonstration program. (WDM)

  10. Static Aeroelastic Deformation Effects in Preliminary Wind-tunnel Tests of Silent Supersonic Technology Demonstrator

    OpenAIRE

    Makino, Yoshikazu; Ohira, Keisuke; Makimoto, Takuya; Mitomo, Toshiteru; 牧野, 好和; 大平, 啓介; 牧本, 卓也; 三友, 俊輝

    2011-01-01

    Effects of static aeroelastic deformation of a wind-tunnel test model on the aerodynamic characteristics are discussed in wind-tunnel tests in the preliminary design phase of the silent supersonic technology demonstrator (S3TD). The static aeroelastic deformation of the main wing is estimated for JAXA 2m x 2m transonic wind-tunnel and 1m x 1m supersonic wind-tunnel by a finite element method (FEM) structural analysis in which its structural model is tuned with the model deformation calibratio...

  11. NSTAR Ion Thruster and Breadboard Power Processor Functional Integration Test Results

    Science.gov (United States)

    Hamley, John A.; Pinero, Luis R.; Rawlin, Vincent K.; Miller, John R.; Myers, Roger M.; Bowers, Glen E.

    1996-01-01

    A 2.3 kW Breadboard Power Processing Unit (BBPPU) was developed as part of the NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) Program. The NSTAR program will deliver an electric propulsion system based on a 30 cm xenon ion thruster to the New Millennium (NM) program for use as the primary propulsion system for the initial NM flight. The final development test for the BBPPU, the Functional Integration Test, was carried out to demonstrate all aspects of BBPPU operation with an Engineering Model Thruster. Test objectives included: (1) demonstration and validation of automated thruster start procedures, (2) demonstration of stable closed loop control of the thruster beam current, (3) successful response and recovery to thruster faults, and (4) successful safing of the system during simulated spacecraft faults. These objectives were met over the specified 80-120 VDC input voltage range and 0.5-2.3 output power capability of the BBPPU. Two minor anomalies were noted in discharge and neutralizer keeper current. These anomalies did not affect the stability of the system and were successfully corrected.

  12. 40 CFR 63.9915 - What test methods and other procedures must I use to demonstrate initial compliance with dioxin...

    Science.gov (United States)

    2010-07-01

    ... must I use to demonstrate initial compliance with dioxin/furan emission limits? 63.9915 Section 63.9915....9915 What test methods and other procedures must I use to demonstrate initial compliance with dioxin... limit for dioxins/furans in Table 1 to this subpart, you must follow the test methods and procedures...

  13. Relationship between ultrasonic pulse velocity test result and ...

    African Journals Online (AJOL)

    Ultrasonic Pulse Velocity test result showed an inverse relationship (of -0.935) with the crushed concrete compressive strength. Correlation test, multiple regression analysis, graphs and visual inspection were used to analyze the results. The conclusion drawn is that there exists a relationship between UPV test results and ...

  14. Mathematics Placement Test: Typical Results with Unexpected Outcomes

    Science.gov (United States)

    Ingalls, Victoria

    2011-01-01

    Based on the results of a prior case-study analysis of mathematics placement at one university, the mathematics department developed and piloted a mathematics placement test. This article describes the implementation process for a mathematics placement test and further analyzes the test results for the pilot group. As an unexpected result, the…

  15. Test Results of PBMR Fuel Spheres

    International Nuclear Information System (INIS)

    Koshcheev, Konstantin; Diakov, Alexander; Beltyukov, Igor; Barybin, Andrey; Chernetsov, Mikhail

    2014-01-01

    Results of pre-irradiation testing of fuel spheres (FS) and coated particles (CP) manufactured by PBMR SOC (Republic of South Africa) are described. The stable high quality level of major characteristics (dimensions, CP coating structure, uranium-235 contamination of the FS matrix graphite and the outer PyC layer of the CP coating) are shown. Results of a methodical irradiation test of two FS in helium and neon medium at temperatures of 800 to 1300 °C with simultaneous determination of release-to-birth ratios for major gaseous fission products (GFP) are described. (author)

  16. Results of interlaboratory tests regarding TXRF

    International Nuclear Information System (INIS)

    Klockenkaemper, R.; Bohlen, A. von

    2000-01-01

    Interlaboratory or intercomparison tests can be performed for proficiency testing of individual laboratories, for the certification of a special sample material and for the validation of a certain method. We participated in two interlaboratory tests in order to validate total reflection x-ray fluorescence analysis (TXRF). We used our results to evaluate TXRF and to compare it with other competing methods, particularly with respect of precision and accuracy. The first interlaboratory test was organized by IAEA (International Atomic Energy Agency, Vienna, Austria). As a candidate for reference material, a lichen (IAEA-336 Lichen) was distributed among 27 participants. In our laboratory, the powdered biogenic material was digested with nitric acid under high pressure and analyzed by TXRF. - The second interlaboratory test was organized by IRMM (Institute for Reference Materials and Measurements, Geel, Belgium). As a certified test sample with undisclosed values, a sediment (IMEP-14) was delivered to 220 laboratories. We digested the geogenic material again by nitric acid and additionally by hydrofluoric acid and analyzed it by TXRF. - In both test samples, six or eight different trace elements, respectively, were determined by TXRF with a content between 2 and 2000 mg/kg. Calibration was carried out by internal standardization. For that purpose, Ga or Se, respectively, was added as standard element. The measurement uncertainty of TXRF was estimated by the method of error propagation. In our paper we will report on the results of the two interlaboratory tests. It will be shown that TXRF is highly reliable for a correct determination of trace elements in biogenic and geogenic samples. It is competitive with the established methods of trace analyses which were involved in these tests and it is even superior to them in certain aspects. (author)

  17. Mobile evaporator corrosion test results

    International Nuclear Information System (INIS)

    Rozeveld, A.; Chamberlain, D.B.

    1997-05-01

    Laboratory corrosion tests were conducted on eight candidates to select a durable and cost-effective alloy for use in mobile evaporators to process radioactive waste solutions. Based on an extensive literature survey of corrosion data, three stainless steel alloys (304L, 316L, AL-6XN), four nickel-based alloys (825, 625, 690, G-30), and titanium were selected for testing. The corrosion tests included vapor phase, liquid junction (interface), liquid immersion, and crevice corrosion tests on plain and welded samples of candidate materials. Tests were conducted at 80 degrees C for 45 days in two different test solutions: a nitric acid solution. to simulate evaporator conditions during the processing of the cesium ion-exchange eluant and a highly alkaline sodium hydroxide solution to simulate the composition of Tank 241-AW-101 during evaporation. All of the alloys exhibited excellent corrosion resistance in the alkaline test solution. Corrosion rates were very low and localized corrosion was not observed. Results from the nitric acid tests showed that only 316L stainless steel did not meet our performance criteria. The 316L welded interface and crevice specimens had rates of 22.2 mpy and 21.8 mpy, respectively, which exceeds the maximum corrosion rate of 20 mpy. The other welded samples had about the same corrosion resistance as the plain samples. None of the welded samples showed preferential weld or heat-affected zone (HAZ) attack. Vapor corrosion was negligible for all alloys. All of the alloys except 316L exhibited either open-quotes satisfactoryclose quotes (2-20 mpy) or open-quotes excellentclose quotes (<2 mpy) corrosion resistance as defined by National Association of Corrosion Engineers. However, many of the alloys experienced intergranular corrosion in the nitric acid test solution, which could indicate a susceptibility to stress corrosion cracking (SCC) in this environment

  18. ITER TASK T299 (1995): HITEX demonstration tests

    International Nuclear Information System (INIS)

    Rodrigo, L.; Miller, J.M.; Senohrabek, J.A.; Busigin, A.; Gierszewski, P.

    1996-01-01

    The objective of this task is to demonstrate processes for different cleanup and detritiation of the plasma exhaust. In this subtask, the objectives were to provide further design data on the HITEX process, and to build and demonstrate 2-stage high-detritiation HITEX performance. (author). 5 refs., 10 tabs., 21 figs

  19. Compact Multipurpose Mobile Laser Scanning System — Initial Tests and Results

    Directory of Open Access Journals (Sweden)

    Craig Glennie

    2013-01-01

    Full Text Available We describe a prototype compact mobile laser scanning system that may be operated from a backpack or unmanned aerial vehicle. The system is small, self-contained, relatively inexpensive, and easy to deploy. A description of system components is presented, along with the initial calibration of the multi-sensor platform. The first field tests of the system, both in backpack mode and mounted on a helium balloon for real-world applications are presented. For both field tests, the acquired kinematic LiDAR data are compared with highly accurate static terrestrial laser scanning point clouds. These initial results show that the vertical accuracy of the point cloud for the prototype system is approximately 4 cm (1σ in balloon mode, and 3 cm (1σ in backpack mode while horizontal accuracy was approximately 17 cm (1σ for the balloon tests. Results from selected study areas on the Sacramento River Delta and San Andreas Fault in California demonstrate system performance, deployment agility and flexibility, and potential for operational production of high density and highly accurate point cloud data. Cost and production rate trade-offs place this system in the niche between existing airborne and tripod mounted LiDAR systems.

  20. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    International Nuclear Information System (INIS)

    Lombard, K.H.

    1994-01-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing new and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays

  1. Supercritical CO2 test loop operation and first test results

    International Nuclear Information System (INIS)

    Wright, Steven A.; Pickard, Paul S.

    2009-01-01

    The DOE Office of Nuclear Energy is investigating advanced Brayton cycles for use with next generation nuclear power plants. The focus of this work is on the supercritical CO 2 Brayton cycle which has the potential for high efficiency, and for reduced capital costs due to very compact turbomachinery. Sandia has fabricated and is operating a supercritical CO 2 (S-CO 2 ) test loop to investigate the key technology issues associated with this cycle. This loop is part of a multi-year phased development program to develop a megawatt (MW) class closed S-CO 2 Brayton cycle to demonstrate the applicability of this cycle for DOE Gen-IV program. The current loop has been configured as both a compression loop and as simple heated but unrecuperated Brayton cycle. A second split-flow or re-compression Brayton cycle is currently under development that will use approximately 1 MW of heat to run the Brayton cycle. Early configurations of this split-flow Brayton cycle will be operational later this fiscal year. The key issues for this cycle include the fundamental issues of compressor fluid performance and system control near the critical point, but also the supporting technology issues of bearings, sealing technologies, and rotor windage losses which are also essential to achieving efficiency and cost objectives. These tests are providing the first measurements and information on these key supercritical CO 2 power conversion systems questions. Important data for all these issues has been obtained. This report presents the major results of the testing by showing and comparing the measured compressor performance map with the predicted performance. The compression loop uses a ∼50 kWe motor driven compressor to spin a 37 mm OD compressor at design speeds up to 75,000 rpm with a pressure ratio of 1.8 and a flow rate of 3.53 kg/s for a compressor inlet condition of 305.3 K and 7690 kPa. The most recent configuration of this loop has added a small turbine and 260 kW of heater power is

  2. SOFC - Manufacture of stacks for test and demonstration related activities, stack and system tests and identification of end user requirements. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, Joachim; Primdahl, S.; Boegh Elmose, H.; Weineisen, H.; Richter, A.

    2008-11-15

    The aim of the project was to solve the technical challenges in relation to stack functionality in connection with operation of multi stack assemblies under realistic operating conditions. It was the intention to make a targeted effort with the aim of developing a high performance stack technology suitable for both small and large units. An important part of the project was the testing of stack assemblies up to 10 kW power range with relevant fuel and realistic operation condition in the test facility at HC OErstedvaerket. The manufacturing of stacks in the project was as planned a number of stacks (70 kW) for use in demonstration projects both for single stacks and for multi stack assemblies. The start up of the work on the SOFC test facility at HC OErstedsvaerket (HCV) was delayed due to a late delivery of the unit from the PSO 6385 project. A number of unforeseen events during the project have meant that the SOFC test facility at HCV has not until now been ready for performing tests. The experience gained from the operation of a 20 kW Alpha unit in a co-operation between TOFC and Waertsilae now provides an important contribution to the future multi stack assemblies. The work on identification of end user requirements has resulted in a number of different development priorities for the m-CHP and the Distributed Generation market segments. (au)

  3. Resumption of surrogate testing in the Engineering Demonstration System at the Lawrence Livermore National Laboratory: Environmental assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The Engineering Demonstration System (EDS) is an existing equipment system within the Plutonium Facility at the Lawrence Livermore National Laboratory (LLNL) designed to test the Atomic Vapor Laser Isotope Separation (AVLIS) process for application to the Special Isotope Separation (SIS) program. The proposed action is to resume testing with members of the family of rare-earth metals in the EDS. The purpose of these tests is to train operators, verify operations procedures and obtain information on the engineering design, operational reliability, and separative performance capability of the integrated system hardware. The information to be provided by the EDS tests with the rare-earth metals is needed for engineering and operability evaluation of the prototype AVLIS separator hardware in an integrated system configuration. These evaluations are necessary to demonstrate the technology to the maximum extent possible, short of actual validation with plutonium. The EDS tests to be performed would use single and multiple separator units. Testing would be intermittent in nature, typically consisting of one to two tests per month, with durations ranging from approximately 10 to 200 h. 19 refs., 4 figs., 5 tabs

  4. Relocation work of temporary thermocouples for measuring the vessel cooling system in the safety demonstration test

    International Nuclear Information System (INIS)

    Shimazaki, Yosuke; Shinohara, Masanori; Ono, Masato; Yanagi, Shunki; Tochio, Daisuke; Iigaki, Kazuhiko

    2012-05-01

    It is necessary to confirm that the temperature of water cooling panel of the vessel cooling system (VCS) is controlled under the allowable working temperature during the safety demonstration test because the water cooling panel temperature rises due to stop of cooling water circulation pumps. Therefore, several temporary thermocouples are relocated to the water cooling panel near the stabilizers of RPV and the side cooling panel outlet ring header of VCS in order to observe the temperature change of VCS. The relocated thermocouples can measure the temperature change with starting of the cooling water circulation pumps of VCS. So it is confirmed that the relocated thermocouples can observe the VCS temperature change in the safety demonstration test. (author)

  5. Reproducibility of the results in ultrasonic testing

    International Nuclear Information System (INIS)

    Chalaye, M.; Launay, J.P.; Thomas, A.

    1980-12-01

    This memorandum reports on the conclusions of the tests carried out in order to evaluate the reproducibility of ultrasonic tests made on welded joints. FRAMATOME have started a study to assess the dispersion of results afforded by the test line and to characterize its behaviour. The tests covered sensors and ultrasonic generators said to be identical to each other (same commercial batch) [fr

  6. Sandia National Laboratories cask drop test programme: a demonstration of fracture mechanics principles for the prevention of brittle fracture

    International Nuclear Information System (INIS)

    McConnell, P.; Sorenson, K.B.

    1995-01-01

    Sandia National Laboratories recently completed a cask drop test programme. The aims of the programme were (1) to demonstrate the applicability of a fracture mechanics-based methodology for ensuring cask integrity, and (2) to assess the viability of using a ferritic materials for cask containment. The programme consisted of four phases: (i) materials characterisation; (ii) non-destructive examination of the cask; (iii) finite element analyses of the drop events; and (iv) a series of drop tests of a ductile iron cask. The first three phases of the programme provided information for fracture mechanics analyses and predictions for the drop test phase. The drop tests were nominally based upon the IAEA 9 m drop height hypothetical accident scenario although one drop test was from 18 m. All tests were performed in the side drop orientation at a temperature of -29 o C. A circumferential, mid-axis flaw was introduced into the cask body for each drop test. Flaw depth ranged from 19 to 76 mm. Steel saddles were welded to the side wall of the cask to enhance the stresses imposed upon the cask in the region of the introduced flaw. The programme demonstrated the applicability of a fracture mechanics methodology for predicting the conditions under which brittle fracture may occur and thereby the utility of fracture mechanics design for ensuring cask structural integrity by ensuring an appropriate margin of safety. Positive assessments of ductile iron for cask containment and the quality of the casting process for producing ductile iron casks were made. The results of this programme have provided data to support IAEA efforts to develop brittle fracture acceptance criteria for cask containment. (author)

  7. Improvement in post test accident analysis results prediction for the test no. 2 in PSB test facility by applying UMAE methodology

    International Nuclear Information System (INIS)

    Dubey, S.K.; Petruzzi, A.; Giannotti, W.; D'Auria, F.

    2006-01-01

    This paper mainly deals with the improvement in the post test accident analysis results prediction for the test no. 2, 'Total loss of feed water with failure of HPIS pumps and operator actions on primary and secondary circuit depressurization', carried-out on PSB integral test facility in May 2005. This is one the most complicated test conducted in PSB test facility. The prime objective of this test is to provide support for the verification of the accident management strategies for NPPs and also to verify the correctness of some safety systems operating only during accident. The objective of this analysis is to assess the capability to reproduce the phenomena occurring during the selected tests and to quantify the accuracy of the code calculation qualitatively and quantitatively for the best estimate code Relap5/mod3.3 by systematically applying all the procedures lead by Uncertainty Methodology based on Accuracy Extrapolation (UMAE), developed at University of Pisa. In order to achieve these objectives test facility nodalisation qualification for both 'steady state level' and 'on transient level' are demonstrated. For the 'steady state level' qualification compliance to acceptance criteria established in UMAE has been checked for geometrical details and thermal hydraulic parameters. The following steps have been performed for evaluation of qualitative qualification of 'on transient level': visual comparisons between experimental and calculated relevant parameters time trends; list of comparison between experimental and code calculation resulting time sequence of significant events; identification/verification of CSNI phenomena validation matrix; use of the Phenomenological Windows (PhW), identification of Key Phenomena and Relevant Thermal-hydraulic Aspects (RTA). A successful application of the qualitative process constitutes a prerequisite to the application of the quantitative analysis. For quantitative accuracy of code prediction Fast Fourier Transform Based

  8. Scaled Vitrification System III (SVS III) Process Development and Laboratory Tests at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Jain, V.; Barnes, S.M.; Bindi, B.G.; Palmer, R.A.

    2000-01-01

    At the West Valley Demonstration Project (WVDP),the Vitrification Facility (VF)is designed to convert the high-level radioactive waste (HLW)stored on the site to a stable glass for disposal at a Department of Energy (DOE)-specified federal repository. The Scaled Vitrification System III (SVS-III)verification tests were conducted between February 1995 and August 1995 as a supplemental means to support the vitrification process flowsheet, but at only one seventh the scale.During these tests,the process flowsheet was refined and optimized. The SVS-III test series was conducted with a focus on confirming the applicability of the Redox Forecasting Model, which was based on the Index of Feed Oxidation (IFO)developed during the Functional and Checkout Testing of Systems (FACTS)and SVS-I tests. Additional goals were to investigate the prototypical feed preparation cycle and test the new target glass composition. Included in this report are the basis and current designs of the major components of the Scale Vitrification System and the results of the SVS-III tests.The major subsystems described are the feed preparation and delivery, melter, and off-gas treatment systems. In addition,the correlation between the melter's operation and its various parameters;which included feed rate,cold cap coverage,oxygen reduction (redox)state of the glass,melter power,plenum temperature,and airlift analysis;were developed

  9. Shoe contact dermatitis from dimethyl fumarate: clinical manifestations, patch test results, chemical analysis, and source of exposure.

    Science.gov (United States)

    Giménez-Arnau, Ana; Silvestre, Juan Francisco; Mercader, Pedro; De la Cuadra, Jesus; Ballester, Isabel; Gallardo, Fernando; Pujol, Ramón M; Zimerson, Erik; Bruze, Magnus

    2009-11-01

    The methyl ester form of fumaric acid named dimethyl fumarate (DMF) is an effective mould-growth inhibitor. Its irritating and sensitizing properties were demonstrated in animal models. Recently, DMF has been identified as responsible for furniture contact dermatitis in Europe. To describe the clinical manifestations, patch test results, shoe chemical analysis, and source of exposure to DMF-induced shoe contact dermatitis. Patients with suspected shoe contact dermatitis were studied in compliance with the Declaration of Helsinki. Patch test results obtained with their own shoe and the European baseline series, acrylates and fumaric acid esters (FAE), were recorded according to international guidelines. The content of DMF in shoes was analysed with gas chromatography and mass spectrometry. Acute, immediate irritant contact dermatitis and non-immunological contact urticaria were observed in eight adults and two children, respectively. All the adult patients studied developed a delayed sensitization demonstrated by a positive patch testing to DMF Global preventive measures for avoiding contact with DMF are necessary.

  10. Towards General Evaluation of Intelligent Systems: Lessons Learned from Reproducing AIQ Test Results

    Science.gov (United States)

    Vadinský, Ondřej

    2018-03-01

    This paper attempts to replicate the results of evaluating several artificial agents using the Algorithmic Intelligence Quotient test originally reported by Legg and Veness. Three experiments were conducted: One using default settings, one in which the action space was varied and one in which the observation space was varied. While the performance of freq, Q0, Qλ, and HLQλ corresponded well with the original results, the resulting values differed, when using MC-AIXI. Varying the observation space seems to have no qualitative impact on the results as reported, while (contrary to the original results) varying the action space seems to have some impact. An analysis of the impact of modifying parameters of MC-AIXI on its performance in the default settings was carried out with the help of data mining techniques used to identifying highly performing configurations. Overall, the Algorithmic Intelligence Quotient test seems to be reliable, however as a general artificial intelligence evaluation method it has several limits. The test is dependent on the chosen reference machine and also sensitive to changes to its settings. It brings out some differences among agents, however, since they are limited in size, the test setting may not yet be sufficiently complex. A demanding parameter sweep is needed to thoroughly evaluate configurable agents that, together with the test format, further highlights computational requirements of an agent. These and other issues are discussed in the paper along with proposals suggesting how to alleviate them. An implementation of some of the proposals is also demonstrated.

  11. Performance test results of mock-up test facility of HTTR hydrogen production system

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo

    2004-01-01

    For the purpose to demonstrate effectiveness of high-temperature nuclear heat utilization, Japan Atomic Energy Research Institute has been developing a hydrogen production system and has planned to connect the hydrogen production system to High Temperature Engineering Test Reactor (HTTR). Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30-scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. After its construction, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120m 3 /h, which satisfy the design value, and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator. The mock-up test of the HTTR hydrogen production system using this facility will continue until 2004. (author)

  12. RESULTS OF INITIAL AMMONIA OXIDATION TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Nash, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Fowley, M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-12-30

    This memo presents an experimental survey of aqueous phase chemical processes to remove aqueous ammonia from waste process streams. Ammonia is generated in both the current Hanford waste flowsheet and in future waste processing. Much ammonia will be generated in the Low Activity Waste (LAW) melters.i Testing with simulants in glass melters at Catholic University has demonstrated the significant ammonia production.ii The primary reaction there is the reducing action of sugar on nitrate in the melter cold cap. Ammonia has been found to be a problem in secondary waste stabilization. Ammonia vapors are noxious and destruction of ammonia could reduce hazards to waste treatment process personnel. It is easily evolved especially when ammonia-bearing solutions are adjusted to high pH.

  13. In-pile test results of HANA claddings in Halden research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Jong Hyuk; Choi, Byoung Kwon; Jeong, Yong Hwan; Jung, Yun Ho [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    2005-07-01

    It is a kind of facing tasks in the nuclear industry to develop advanced claddings for high burn-up fuel which is safer and more economical than the existing conventional ones. Since 1997, taking an initiative in KAERI, the Zr cladding development team has carried out the R and D activities for the development of the advanced claddings to be used in the high burn-up fuel (>70,000 MWD.MTU). The team had produced the advanced claddings (HANA, High-performance Alloy for Nuclear Application) from the patented composition and manufacturing process in the international collaboration with U.S. and Japan. Now, the HANA claddings have being demonstrated their good performances from the out-of-pile tests including the corrosion, creep, burst, tensile, microstructures LOCA, RIA, wear, and so on. In parallel to the out-of-pile performance tests, the HANA claddings are being undertaken to evaluate their in-pile properties in Halden research reactor. In this study, it is included the test overviews, conditions, and results of the HANA claddings in the Halden reactor.

  14. Innovative technology demonstration

    International Nuclear Information System (INIS)

    Anderson, D.B.; Luttrell, S.P.; Hartley, J.N.; Hinchee, R.

    1992-04-01

    The Innovative Technology Demonstration (ITD) program at Tinker Air Force Base (TAFB), Oklahoma City, Oklahoma, will demonstrate the overall utility and effectiveness of innovative technologies for site characterization, monitoring, and remediation of selected contaminated test sites. The current demonstration test sites include a CERCLA site on the NPL list, located under a building (Building 3001) that houses a large active industrial complex used for rebuilding military aircraft, and a site beneath and surrounding an abandoned underground tank vault used for storage of jet fuels and solvents. The site under Building 3001 (the NW Test Site) is contaminated with TCE and Cr +6 ; the site with the fuel storage vault (the SW Tanks Site) is contaminated with fuels, BTEX and TCE. These sites and others have been identified for cleanup under the Air Force's Installation Restoration Program (IRP). This document describes the demonstrations that have been conducted or are planned for the TAFB

  15. Acknowledging the results of blood tests

    DEFF Research Database (Denmark)

    Torkilsheyggi, Arnvør Martinsdottir á; Hertzum, Morten

    At the studied hospital, physicians from the Medical and Surgical Departments work some of their shifts in the Emergency Department (ED). Though icons showing the blood-test process were introduced on electronic whiteboards in the ED, these icons did not lead to increased attention to test acknow...... acknowledgement. Rather, the physicians, trans-ferred work practices from their own departments, which did not have electronic white-boards, to the ED. This finding suggests a challenge to the cross-disciplinary work and norms for how to follow up on blood-test results in the ED....

  16. The CMS event builder demonstrator and results with Myrinet

    CERN Document Server

    Antchev, G; Cittolin, Sergio; Erhan, S; Faure, B; Gigi, D; Gutleber, J; Jacobs, C; Meijers, F; Meschi, E; Ninane, A; Orsini, L; Pollet, Lucien; Rácz, A; Samyn, D; Schleifer, W; Sinanis, N; Sphicas, Paris

    2001-01-01

    The data acquisition system for the CMS experiment at the Large Hadron Collider (LHC) will require a large and high performance event building network. Several switch technologies are currently being evaluated in order to compare different architectures for the event builder. One candidate is Myrinet. This paper describes the demonstrator which has been setup to study a small-scale (16*16) event builder based on PCs running Linux connected to Myrinet and Ethernet switches. A detailed study of the Myrinet switch performance has been performed for various traffic conditions, including the behaviour of composite switches. Results from event building studies are presented, including measurements on throughput, overhead and scaling. Traffic shaping techniques have been implemented and the effect on the event building performance has been investigated. The paper reports on performances and maximum event rate obtainable using custom software, not described, for the Myrinet control program and the low-level communica...

  17. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports

  18. Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

    Science.gov (United States)

    Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.

    1990-01-01

    During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

  19. 'False-positive' and 'false-negative' test results in clinical urine drug testing.

    Science.gov (United States)

    Reisfield, Gary M; Goldberger, Bruce A; Bertholf, Roger L

    2009-08-01

    The terms 'false-positive' and 'false-negative' are widely used in discussions of urine drug test (UDT) results. These terms are inadequate because they are used in different ways by physicians and laboratory professionals and they are too narrow to encompass the larger universe of potentially misleading, inappropriate and unexpected drug test results. This larger universe, while not solely comprised of technically 'true' or 'false' positive or negative test results, presents comparable interpretive challenges with corresponding clinical implications. In this review, we propose the terms 'potentially inappropriate' positive or negative test results in reference to UDT results that are ambiguous or unexpected and subject to misinterpretation. Causes of potentially inappropriate positive UDT results include in vivo metabolic conversions of a drug, exposure to nonillicit sources of a drug and laboratory error. Causes of potentially inappropriate negative UDT results include limited assay specificity, absence of drug in the urine, presence of drug in the urine, but below established assay cutoff, specimen manipulation and laboratory error. Clinical UDT interpretation is a complicated task requiring knowledge of recent prescription, over-the-counter and herbal drug administration, drug metabolism and analytical sensitivities and specificities.

  20. Innovative technology demonstrations

    International Nuclear Information System (INIS)

    Anderson, D.B.; Hartley, J.N.; Luttrell, S.P.

    1992-04-01

    Currently, several innovative technologies are being demonstrated at Tinker Air Force Base (TAFB) to address specific problems associated with remediating two contaminated test sites at the base. Cone penetrometer testing (CPT) is a form of testing that can rapidly characterize a site. This technology was selected to evaluate its applicability in the tight clay soils and consolidated sandstone sediments found at TAFB. Directionally drilled horizontal wells have been successfully installed at the US Department of Energy's (DOE) Savannah River Site to test new methods of in situ remediation of soils and ground water. This emerging technology was selected as a method that may be effective in accessing contamination beneath Building 3001 without disrupting the mission of the building, and in enhancing the extraction of contamination both in ground water and in soil. A soil gas extraction (SGE) demonstration, also known as soil vapor extraction, will evaluate the effectiveness of SGE in remediating fuels and TCE contamination contained in the tight clay soil formations surrounding the abandoned underground fuel storage vault located at the SW Tanks Site. In situ sensors have recently received much acclaim as a technology that can be effective in remediating hazardous waste sites. Sensors can be useful for determining real-time, in situ contaminant concentrations during the remediation process for performance monitoring and in providing feedback for controlling the remediation process. A demonstration of two in situ sensor systems capable of providing real-time data on contamination levels will be conducted and evaluated concurrently with the SGE demonstration activities. Following the SGE demonstration, the SGE system and SW Tanks test site will be modified to demonstrate bioremediation as an effective means of degrading the remaining contaminants in situ

  1. Advanced stellar compass deep space navigation, ground testing results

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Jørgensen, Peter Siegbjørn

    2006-01-01

    Deep space exploration is in the agenda of the major space agencies worldwide and at least the European Space Agency (SMART & Aurora Programs) and the American NASA (New Millennium Program) have set up programs to allow the development and the demonstration of technologies that can reduce the risks...... and the costs of the deep space missions. Navigation is the Achilles' heel of deep space. Being performed on ground, it imposes considerable constraints on the system and the operations, it is very expensive to execute, especially when the mission lasts several years and, above all, it is not failure tolerant...... to determine the orbit of a spacecraft autonomously, on-board and without any a priori knowledge of any kind. The solution is robust, elegant and fast. This paper presents the preliminary performances obtained during the ground tests. The results are very positive and encouraging....

  2. Retinal, optic nerve and chiasmal function following radiation therapy demonstrated by visual evoked response testing

    International Nuclear Information System (INIS)

    Soni, A.B.; Constine, L.S.; Smith, D.; Palisca, M.; Ojomo, K.; Muhs, A.

    1997-01-01

    Purpose: To evaluate the tolerance of the retina, optic nerve, and optic chiasm to radiation doses conventionally used to treat patients with primary brain or pituitary tumors and to explore the character of detectable radiation effects. Visual evoked response (VER) testing is a noninvasive and sensitive method for identifying radiation injury to the visual system due to alterations in small vessel or myelin integrity. Such evaluations may increase our understanding of the threshold for and the pathogenesis of radiation injury. Materials and Methods: Twenty-four patients irradiated for brain or pituitary tumors between 1972 and 1996 had VER testing. Patients were included in study if the retina, optic nerves or chiasm were in the radiation (RT) field. At the time of RT patients ranged in age from 1.5 to 55 years (median 33). Mean doses were as follows: right retina, 29 Gy (range 10 - 60 Gy); left retina, 29.5 Gy (range 10 - 60 Gy); right optic nerve, 42.9 Gy (range 10 - 60 Gy); left optic nerve, 42.6 Gy (range 10 - 60 Gy); and optic chiasm, 48.2 Gy (range 10 - 65 Gy). Daily fractionation ranged from 1.5 to 1.8 Gy. Pattern VER testing distinguishes compressive or ischemic effects of tumor on the visual system from radiation retinopathy or optic neuropathy on the basis of the conduction amplitude and delay pattern. Prechiasm, chiasm, and postchiasm injuries are distinguishable by analyzing VER changes. Four evoked responses were obtained for each eye, each representing the average of 100 stimulus reversals. Results: VER was normal in 11 patients and abnormal in 13 patients. Only 2 patients (8%) had VER evidence of radiation injury to the visual system, one of whom had visual compromise. The other 11 abnormal patients had characteristic VER changes attributable to tumor or surgical damage. There was no significant difference in the radiation doses given to any subgroup. The one patient with radiation retinopathy had received 55-60 Gy to the posterior globe. Ten years

  3. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  4. Demonstration recommendations for accelerated testing of concrete decontamination methods

    Energy Technology Data Exchange (ETDEWEB)

    Dickerson, K.S.; Ally, M.R.; Brown, C.H.; Morris, M.I.; Wilson-Nichols, M.J.

    1995-12-01

    A large number of aging US Department of Energy (DOE) surplus facilities located throughout the US require deactivation, decontamination, and decommissioning. Although several technologies are available commercially for concrete decontamination, emerging technologies with potential to reduce secondary waste and minimize the impact and risk to workers and the environment are needed. In response to these needs, the Accelerated Testing of Concrete Decontamination Methods project team described the nature and extent of contaminated concrete within the DOE complex and identified applicable emerging technologies. Existing information used to describe the nature and extent of contaminated concrete indicates that the most frequently occurring radiological contaminants are {sup 137}Cs, {sup 238}U (and its daughters), {sup 60}Co, {sup 90}Sr, and tritium. The total area of radionuclide-contaminated concrete within the DOE complex is estimated to be in the range of 7.9 {times} 10{sup 8} ft{sup 2}or approximately 18,000 acres. Concrete decontamination problems were matched with emerging technologies to recommend demonstrations considered to provide the most benefit to decontamination of concrete within the DOE complex. Emerging technologies with the most potential benefit were biological decontamination, electro-hydraulic scabbling, electrokinetics, and microwave scabbling.

  5. Demonstration recommendations for accelerated testing of concrete decontamination methods

    International Nuclear Information System (INIS)

    Dickerson, K.S.; Ally, M.R.; Brown, C.H.; Morris, M.I.; Wilson-Nichols, M.J.

    1995-12-01

    A large number of aging US Department of Energy (DOE) surplus facilities located throughout the US require deactivation, decontamination, and decommissioning. Although several technologies are available commercially for concrete decontamination, emerging technologies with potential to reduce secondary waste and minimize the impact and risk to workers and the environment are needed. In response to these needs, the Accelerated Testing of Concrete Decontamination Methods project team described the nature and extent of contaminated concrete within the DOE complex and identified applicable emerging technologies. Existing information used to describe the nature and extent of contaminated concrete indicates that the most frequently occurring radiological contaminants are 137 Cs, 238 U (and its daughters), 60 Co, 90 Sr, and tritium. The total area of radionuclide-contaminated concrete within the DOE complex is estimated to be in the range of 7.9 x 10 8 ft 2 or approximately 18,000 acres. Concrete decontamination problems were matched with emerging technologies to recommend demonstrations considered to provide the most benefit to decontamination of concrete within the DOE complex. Emerging technologies with the most potential benefit were biological decontamination, electro-hydraulic scabbling, electrokinetics, and microwave scabbling

  6. Wind tunnel testing of the DeepWind demonstrator in design and tilted operating conditions

    DEFF Research Database (Denmark)

    Battistia, L.; Benini, E.; Brighenti, A.

    2016-01-01

    The DeepWind Project aims at investigating the feasibility of a new floating vertical-axis wind turbine (VAWT) concept, whose purpose is to exploit wind resources at deep-water offshore sites. The results of an extensive experimental campaign on the DeepWind reduced scale demonstrator are here...... was installed on a high precision test bench, whose axis was suitable to be inclined up to 15° with respect to the design (i.e. upright) operating condition. The experiments were performed at the large scale, high speed wind tunnel of the Politecnico di Milano (Italy), using a “free jet” (open channel...... presented for different wind speeds and rotor angular velocities, including also skewed flow operation due to a tilted rotor arrangement. To accomplish this, after being instrumented to measure aerodynamic power and thrust (both in streamwise and transversal directions), a troposkien three-bladed rotor...

  7. Mechanical and thermal characteristics of JT-60 tokamak machine demonstrated in its power tests

    International Nuclear Information System (INIS)

    Takatsu, Hideyuki; Yamamoto, Masahiro; Ohkubo, Minoru

    1985-09-01

    JT-60 power tests were carried out from Dec. 10, 1984 to Feb. 20, 1985 to demonstrate, in advance of actual plasma operation, satisfactory performance of tokamak machine, power suppliers and control system in combination. The tests began with low power test of individual coil systems and progressed to full power tests. Power tests were successfully concluded with the following conclusions. (1) All of the coil systems were raised up to full power operation in combination and system performance was verified including thermal and structural integrity of tokamak machine. (2) Measured strain and deflection showed good agreements with those predicted in the design, which was an evidence that electromagnetic loads were supported adequately as expected in the design. (3) Vibration of lateral port was found to be large up to 50 m/s 2 and caused excessive vibration of gate-valves. (4) A few limitations to machine operation were made clear quantatively. (5) It was found that the existing detectors were insufficient to monitor the machine integrity and a few kinds of detectors were necessary to be installed. (author)

  8. CAT SCRATCH DISEASE: RESULTS OF COMPLEMENT-FIXATION AND SKIN TESTS

    Science.gov (United States)

    Serologic and skin-testing data on a group of patients having cat scratch disease are presented to demonstrate a possible relationship to the psitt...indicate that the incidence of positive serologic reactions with the psitt-LGV group antigen is consistently higher in patients with cat scratch disease...patients, 2 of 5 did not respond with positive skin reactions when tested with cat scratch antigen, and at least 2 of the remaining 3 responded in a manner difficult to interpret.

  9. Creating a testing field where delta technology and water innovations are tested and demonstrated with the help of citizen science methods

    Science.gov (United States)

    de Vries, Sandra; Rutten, Martine; de Vries, Liselotte; Anema, Kim; Klop, Tanja; Kaspersma, Judith

    2017-04-01

    In highly populated deltas, much work is to be done. Complex problems ask for new and knowledge driven solutions. Innovations in delta technology and water can bring relief to managing the water rich urban areas. Testing fields form a fundamental part of the knowledge valorisation for such innovations. In such testing fields, product development by start-ups is coupled with researchers, thus supplying new scientific insights. With the help of tests, demonstrations and large-scale applications by the end-users, these innovations find their way to the daily practices of delta management. More and more cities embrace the concept of Smart Cities to tackle the ongoing complexity of urban problems and to manage the city's assets - such as its water supply networks and other water management infrastructure. Through the use of new technologies and innovative systems, data are collected from and with citizens and devices - then processed and analysed. The information and knowledge gathered are keys to enabling a better quality of life. By testing water innovations together with citizens in order to find solutions for water management problems, not only highly spatial amounts of data are provided by and/or about these innovations, they are also improved and demonstrated to the public. A consortium consisting of a water authority, a science centre, a valorisation program and two universities have joined forces to create a testing field for delta technology and water innovations using citizen science methods. In this testing field, the use of citizen science for water technologies is researched and validated by facilitating pilot projects. In these projects, researchers, start-ups and citizens work together to find the answer to present-day water management problems. The above mentioned testing field tests the use of crowd-sourcing data as for example hydrological model inputs, or to validate remote sensing applications, or improve water management decisions. Currently the

  10. Evaluating the RELM Test Results

    Directory of Open Access Journals (Sweden)

    Michael K. Sachs

    2012-01-01

    Full Text Available We consider implications of the Regional Earthquake Likelihood Models (RELM test results with regard to earthquake forecasting. Prospective forecasts were solicited for M≥4.95 earthquakes in California during the period 2006–2010. During this period 31 earthquakes occurred in the test region with M≥4.95. We consider five forecasts that were submitted for the test. We compare the forecasts utilizing forecast verification methodology developed in the atmospheric sciences, specifically for tornadoes. We utilize a “skill score” based on the forecast scores λfi of occurrence of the test earthquakes. A perfect forecast would have λfi=1, and a random (no skill forecast would have λfi=2.86×10-3. The best forecasts (largest value of λfi for the 31 earthquakes had values of λfi=1.24×10-1 to λfi=5.49×10-3. The best mean forecast for all earthquakes was λ̅f=2.84×10-2. The best forecasts are about an order of magnitude better than random forecasts. We discuss the earthquakes, the forecasts, and alternative methods of evaluation of the performance of RELM forecasts. We also discuss the relative merits of alarm-based versus probability-based forecasts.

  11. Innovative technology demonstrations

    International Nuclear Information System (INIS)

    Anderson, D.B.; Luttrell, S.P.; Hartley, J.N.

    1992-08-01

    Environmental Management Operations (EMO) is conducting an Innovative Technology Demonstration Program for Tinker Air Force Base (TAFB). Several innovative technologies are being demonstrated to address specific problems associated with remediating two contaminated test sites at the base. Cone penetrometer testing (CPT) is a form of testing that can rapidly characterize a site. This technology was selected to evaluate its applicability in the tight clay soils and consolidated sandstone sediments found at TAFB. Directionally drilled horizontal wells was selected as a method that may be effective in accessing contamination beneath Building 3001 without disrupting the mission of the building, and in enhancing the extraction of contamination both in ground water and in soil. A soil gas extraction (SGE) demonstration, also known as soil vapor extraction, will evaluate the effectiveness of SGE in remediating fuels and TCE contamination contained in the tight clay soil formations surrounding the abandoned underground fuel storage vault located at the SW Tanks Site. In situ sensors have recently received much acclaim as a technology that can be effective in remediating hazardous waste sites. Sensors can be useful for determining real-time, in situ contaminant concentrations during the remediation process for performance monitoring and in providing feedback for controlling the remediation process. Following the SGE demonstration, the SGE system and SW Tanks test site will be modified to demonstrate bioremediation as an effective means of degrading the remaining contaminants in situ. The bioremediation demonstration will evaluate a bioventing process in which the naturally occurring consortium of soil bacteria will be stimulated to aerobically degrade soil contaminants, including fuel and TCE, in situ

  12. Modifications to JLab 12 GeV Refrigerator and Wide Range Mix Mode Performance Testing Results

    Science.gov (United States)

    Knudsen, P.; Ganni, V.; Hasan, N.; Dixon, K.; Norton, R.; Creel, J.

    2017-02-01

    Analysis of data obtained during the spring 2013 commissioning of the new 4.5 K refrigeration system at Jefferson Lab (JLab) for the 12 GeV upgrade indicated a wide capacity range with good efficiency and minimal operator interaction. Testing also showed that the refrigerator required higher liquid nitrogen (LN) consumption for its pre-cooler than anticipated by the design. This does not affect the capacity of the refrigerator, but it does result in an increased LN utility cost. During the summer of 2015 the modifications were implemented by the cold box manufacturer, according to a design similar to the JLab 12 GeV cold box specification. Subsequently, JLab recommissioned the cold box and performed extensive performance testing, ranging from 20% to 100% of the design maximum capacity, and in various modes of operation, ranging from pure refrigeration, pure liquefaction, half-and-half mix mode and at selected design modes using the Floating Pressure - Ganni Cycle. The testing demonstrated that the refrigerator system has a good and fairly constant performance over a wide capacity range and different modes of operation. It also demonstrated the modifications resulted in a LN consumption that met the design for the pure refrigeration mode (which is the most demanding) and was lower than the design for the nominal and maximum capacity modes. In addition, a pulsed-load test, similar to what is expected for cryogenic systems supporting fusion experiments, was conducted to observe the response using the Floating Pressure - Ganni Cycle, which was stable and robust. This paper will discuss the results and analysis of this testing pertaining to the LN consumption, the system efficiency over a wide range of capacity and different modes and the behaviour of the system to a pulsed load.

  13. Large-scale demonstration test plan for digface data acquisition system

    International Nuclear Information System (INIS)

    Roybal, L.G.; Svoboda, J.M.

    1994-11-01

    Digface characterization promotes the use of online site characterization and monitoring during waste retrieval efforts, a need that arises from safety and efficiency considerations during the cleanup of a complex waste site. Information concerning conditions at the active digface can be used by operators as a basis for adjusting retrieval activities to reduce safety risks and to promote an efficient transition between retrieval and downstream operations. Most importantly, workers are given advance warning of upcoming dangerous conditions. In addition, detailed knowledge of digface conditions provides a basis for selecting tools and methods that avoid contamination spread and work stoppages. In FY-94, work began in support of a largescale demonstration coordinating the various facets of a prototype digface remediation operation including characterization, contaminant suppression, and cold waste retrieval. This test plan describes the activities that will be performed during the winter of FY-95 that are necessary to assess the performance of the data acquisition and display system in its initial integration with hardware developed in the Cooperative Telerobotic Retrieval (CTR) program. The six specific objectives of the test are determining system electrical noise, establishing a dynamic background signature of the gantry crane and associated equipment, determining the resolution of the overall system by scanning over known objects, reporting the general functionality of the overall data acquisition system, evaluating the laser topographic functionality, and monitoring the temperature control features of the electronic package

  14. Safety of high speed ground transportation systems: X2000 US demonstration vehicle dynamics trials, preliminary test report. Report for October 1992-January 1993

    Energy Technology Data Exchange (ETDEWEB)

    Whitten, B.T.; Kesler, J.K.

    1993-01-01

    The report documents the procedures, events, and results of vehicle dynamic tests carried out on the ASEA-Brown Boveri (ABB) X2000 tilt body trainset in the US between October 1992 and January 1993. These tests, sponsored by Amtrak and supported by the FRA, were conducted to assess the suitability of the X2000 trainset for safe operation at elevated cant deficiencies and speeds in Amtrak's Northeast Corridor under existing track conditions in a revenue service demonstration. The report describes the safety criteria against which the performance of the X2000 test train was examined, the instrumentation used, the test locations, and the track conditions. Preliminary results are presented from tests conducted on Amtrak lines between Philadelphia and Harrisburg, PA, and between Washington DC and New York NY, in which cant deficiencies of 12.5 inches and speeds of 154 mph were reached in a safe and controlled manner. The significance of the results is discussed, and preliminary conclusions and recommendations are presented.

  15. Results from an in-plant demonstration of intelligent control

    International Nuclear Information System (INIS)

    Edwards, R.M.; Garcia, H.E.; Messick, N.

    1993-01-01

    A learning systems-based reconfigurable controller was demonstrated on the deaerating feedwater heater at the Experimental Breeder Reactor II (EBR-II) on April 1, 1993. Failures of the normal pressure regulating process were introduced by reducing the steam flow to the heater by as much as 10%. The controller maintained pressure in the heater at acceptable levels for several minutes, whereas operator intervention would have otherwise been required within a few seconds. This experiment demonstrates the potential of advanced control techniques for improving safety, reliability, and performance of power plant operations as well as the utility of EBR-II as an experimental power plant controls facility

  16. Buried Waste Integrated Demonstration lessons learned: 1993 technology demonstrations

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Owens, K.J.

    1994-01-01

    An integrated technology demonstration was conducted by the Buried Waste Integrated Demonstration (BWID) at the Idaho National Engineering Laboratory Cold Test Pit in the summer of 1993. This program and demonstration was sponsored by the US Department of Energy Office of Technology Development. The demonstration included six technologies representing a synergistic system for the characterization and retrieval of a buried hazardous waste site. The integrated technology demonstration proved very successful and a summary of the technical accomplishments is presented. Upon completion of the integrated technology demonstration, cognizant program personnel participated in a lessons learned exercise. This exercise was conducted at the Simplot Decision Support Center at Idaho State University and lessons learned activity captured additional information relative to the integration of technologies for demonstration purposes. This information will be used by BWID to enhance program planning and strengthen future technology demonstrations

  17. Validating a dance-specific screening test for balance: preliminary results from multisite testing.

    Science.gov (United States)

    Batson, Glenna

    2010-09-01

    Few dance-specific screening tools adequately capture balance. The aim of this study was to administer and modify the Star Excursion Balance Test (oSEBT) to examine its utility as a balance screen for dancers. The oSEBT involves standing on one leg while lightly targeting with the opposite foot to the farthest distance along eight spokes of a star-shaped grid. This task simulates dance in the spatial pattern and movement quality of the gesturing limb. The oSEBT was validated for distance on athletes with history of ankle sprain. Thirty-three dancers (age 20.1 +/- 1.4 yrs) participated from two contemporary dance conservatories (UK and US), with or without a history of lower extremity injury. Dancers were verbally instructed (without physical demonstration) to execute the oSEBT and four modifications (mSEBT): timed (speed), timed with cognitive interference (answering questions aloud), and sensory disadvantaging (foam mat). Stepping strategies were tracked and performance strategies video-recorded. Unlike the oSEBT results, distances reached were not significant statistically (p = 0.05) or descriptively (i.e., shorter) for either group. Performance styles varied widely, despite sample homogeneity and instructions to control for strategy. Descriptive analysis of mSEBT showed an increased number of near-falls and decreased timing on the injured limb. Dancers appeared to employ variable strategies to keep balance during this test. Quantitative analysis is warranted to define balance strategies for further validation of SEBT modifications to determine its utility as a balance screening tool.

  18. Analysis of SCTF/CCTF counterpart test results

    International Nuclear Information System (INIS)

    Okubo, Tsutomu; Sobajima, Makoto; Iwamura, Takamichi; Ohnuki, Akira; Abe, Yutaka; Adachi, Hiromichi; Murao, Yoshio

    1990-06-01

    Slab Core Test Facility (SCTF) and Cylindrical Core Test Facility (CCTF) are large scale experimental facilities of Japan Atomic Energy Research Institute (JAERI) for the investigation of reflooding behavior during a postulated loss-of-coolant accident (LOCA) in PWRs. Although the flow area scaling ratios of both facilities to a 1,000 MWe class PWR are the same and 1/21.4, the SCTF has the same core width as the radius of the reference PWR while the CCTF has a 1/4.5 times shorter core radius. Therefore, a few SCTF/CCTF counterpart tests were conducted in order to investigate the difference in core reflooding behavior between in the SCTF and CCTF tests as well as the effect of core radial length on core two-dimensional thermo-hydrodynamic behavior. This report present the test results and an analysis on them. Major results obtained are: (1) Taking account of the differences in test conditions and facility design, core reflooding behavior is considered to be similar between the SCTF and the CCTF test. Main difference of the facility design is in the effective core flow area and this is considered to result in the difference in core water accumulation behavior. (2) The effect of core radial length on core two-dimensional thermo-hydrodynamic behavior has been observed to be significant and heat transfer enhancement or degradation in radial direction is more significant for the longer radius core. (3) In addition, where the core power varies significantly in the radial direction, significant heat transfer enhancement has been observed in the higher power bundle during the LPCI period. Also, in the peripheral region, heat transfer degradation has been observed more significantly in the outer bundle even they have the same bundle power. (4) Magnitude of these heat transfer enhancement or degradation was larger at the higher elevation than the midplane level in the SCTF test, whereas smaller in the CCTF test. (author)

  19. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  20. Summary Report on Phase I Results from the 3D Printing in Zero G Technology Demonstration Mission, Volume I

    Science.gov (United States)

    Prater, T. J.; Bean, Q. A.; Beshears, R. D.; Rolin, T. D.; Werkheiser, N. J.; Ordonez, E. A.; Ryan, R. M.; Ledbetter, F. E., III

    2016-01-01

    Human space exploration to date has been confined to low-Earth orbit and the Moon. The International Space Station (ISS) provides a unique opportunity for researchers to prove out the technologies that will enable humans to safely live and work in space for longer periods of time and venture beyond the Earth/Moon system. The ability to manufacture parts in-space rather than launch them from Earth represents a fundamental shift in the current risk and logistics paradigm for human spaceflight. In September 2014, NASA, in partnership with Made In Space, Inc., launched the 3D Printing in Zero-G technology demonstration mission to explore the potential of additive manufacturing for in-space applications and demonstrate the capability to manufacture parts and tools on orbit using fused deposition modeling. This Technical Publication summarizes the results of testing to date of the ground control and flight prints from the first phase of this ISS payload.

  1. The demonstration test of urban EV rental system with 'Hypermini'

    Energy Technology Data Exchange (ETDEWEB)

    Teramoto, M.; Tohyama, E.; Kasai, J. [Nissan Motor Co. Ltd., Tochigi (Japan); Takayama, M. [Electric Technology for Automobile Traffic and Driving Association, Tokyo (Japan)

    2000-07-01

    The efforts taken by the Electric Technology for Automobile Traffic and Driving Association to address environmental pollution associated with traffic jams were discussed. An urban electric vehicle (EV) rent-a-car system has been proposed which combines the intelligent transportation system (ITS) and ultra small EVs as a fourth public traffic system after rail, bus and taxis. A demonstration test of this system began in October 1999 with the Suzuki Motor Corporation. A total of 30 small conversion EV and 20 ultra small EVs, called the 'Hypermini' were tested in the heavily populated Yokohama Minato Mirai 21 District (MM21). The impetus for the feasibility study was the lack of transportation from residential areas to stations and from stations to business areas. The objective was to provide a seamless traffic system for door-to-door service and to improve the use of vehicle parking spaces by an intelligent car sharing system. Another objective was to reduce the operating cost of company cars in urban areas. A comprehensive description of how the urban rent-a-car system works was included along with an overview of the system components and a description of vehicle stations. The solution to one-way-trips was solved by employing people to either drive or tow dropped-off vehicles to their original stations. So far, most users are satisfied with the service. Those with complaints, argued that the range was not sufficient. It was emphasized that in order for the system to be accepted nation wide, it is important to maintain low costs and high reliability in this demonstration stage.

  2. On the Safety and Performance Demonstration Tests of Prototype Gen-IV Sodium-Cooled Fast Reactor and Validation and Verification of Computational Codes

    Directory of Open Access Journals (Sweden)

    Jong-Bum Kim

    2016-10-01

    Full Text Available The design of Prototype Gen-IV Sodium-Cooled Fast Reactor (PGSFR has been developed and the validation and verification (V&V activities to demonstrate the system performance and safety are in progress. In this paper, the current status of test activities is described briefly and significant results are discussed. The large-scale sodium thermal-hydraulic test program, Sodium Test Loop for Safety Simulation and Assessment-1 (STELLA-1, produced satisfactory results, which were used for the computer codes V&V, and the performance test results of the model pump in sodium showed good agreement with those in water. The second phase of the STELLA program with the integral effect tests facility, STELLA-2, is in the detailed design stage of the design process. The sodium thermal-hydraulic experiment loop for finned-tube sodium-to-air heat exchanger performance test, the intermediate heat exchanger test facility, and the test facility for the reactor flow distribution are underway. Flow characteristics test in subchannels of a wire-wrapped rod bundle has been carried out for safety analysis in the core and the dynamic characteristic test of upper internal structure has been performed for the seismic analysis model for the PGSFR. The performance tests for control rod assemblies (CRAs have been conducted for control rod drive mechanism driving parts and drop tests of the CRA under scram condition were performed. Finally, three types of inspection sensors under development for the safe operation of the PGSFR were explained with significant results.

  3. On the safety and performance demonstration tests of Prototype Gen-IV Sodium-Cooled Fast Reactor and validation and verification of computational codes

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Bum; Jeong, Ji Young; Lee, Tae Ho; Kim, Sung Kyun; Euh, Dong Jin; Joo, Hyung Kook [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    The design of Prototype Gen-IV Sodium-Cooled Fast Reactor (PGSFR) has been developed and the validation and verification (V and V) activities to demonstrate the system performance and safety are in progress. In this paper, the current status of test activities is described briefly and significant results are discussed. The large-scale sodium thermal-hydraulic test program, Sodium Test Loop for Safety Simulation and Assessment-1 (STELLA-1), produced satisfactory results, which were used for the computer codes V and V, and the performance test results of the model pump in sodium showed good agreement with those in water. The second phase of the STELLA program with the integral effect tests facility, STELLA-2, is in the detailed design stage of the design process. The sodium thermal-hydraulic experiment loop for finned-tube sodium-to-air heat exchanger performance test, the intermediate heat exchanger test facility, and the test facility for the reactor flow distribution are underway. Flow characteristics test in subchannels of a wire-wrapped rod bundle has been carried out for safety analysis in the core and the dynamic characteristic test of upper internal structure has been performed for the seismic analysis model for the PGSFR. The performance tests for control rod assemblies (CRAs) have been conducted for control rod drive mechanism driving parts and drop tests of the CRA under scram condition were performed. Finally, three types of inspection sensors under development for the safe operation of the PGSFR were explained with significant results.

  4. On the safety and performance demonstration tests of Prototype Gen-IV Sodium-Cooled Fast Reactor and validation and verification of computational codes

    International Nuclear Information System (INIS)

    Kim, Jong Bum; Jeong, Ji Young; Lee, Tae Ho; Kim, Sung Kyun; Euh, Dong Jin; Joo, Hyung Kook

    2016-01-01

    The design of Prototype Gen-IV Sodium-Cooled Fast Reactor (PGSFR) has been developed and the validation and verification (V and V) activities to demonstrate the system performance and safety are in progress. In this paper, the current status of test activities is described briefly and significant results are discussed. The large-scale sodium thermal-hydraulic test program, Sodium Test Loop for Safety Simulation and Assessment-1 (STELLA-1), produced satisfactory results, which were used for the computer codes V and V, and the performance test results of the model pump in sodium showed good agreement with those in water. The second phase of the STELLA program with the integral effect tests facility, STELLA-2, is in the detailed design stage of the design process. The sodium thermal-hydraulic experiment loop for finned-tube sodium-to-air heat exchanger performance test, the intermediate heat exchanger test facility, and the test facility for the reactor flow distribution are underway. Flow characteristics test in subchannels of a wire-wrapped rod bundle has been carried out for safety analysis in the core and the dynamic characteristic test of upper internal structure has been performed for the seismic analysis model for the PGSFR. The performance tests for control rod assemblies (CRAs) have been conducted for control rod drive mechanism driving parts and drop tests of the CRA under scram condition were performed. Finally, three types of inspection sensors under development for the safe operation of the PGSFR were explained with significant results

  5. Small-Scale Spray Releases: Initial Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, Lenna A.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, Garrett N.; Kurath, Dean E.; Buchmiller, William C.; Smith, Dennese M.; Blanchard, Jeremy; Song, Chen; Daniel, Richard C.; Wells, Beric E.; Tran, Diana N.; Burns, Carolyn A.

    2013-05-29

    One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and net generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of antifoam agents was assessed with most of the simulants. Orifices included round holes and

  6. Re-evaluation of the 1995 Hanford Large Scale Drum Fire Test Results

    International Nuclear Information System (INIS)

    Yang, J M

    2007-01-01

    A large-scale drum performance test was conducted at the Hanford Site in June 1995, in which over one hundred (100) 55-gal drums in each of two storage configurations were subjected to severe fuel pool fires. The two storage configurations in the test were pallet storage and rack storage. The description and results of the large-scale drum test at the Hanford Site were reported in WHC-SD-WM-TRP-246, ''Solid Waste Drum Array Fire Performance,'' Rev. 0, 1995. This was one of the main references used to develop the analytical methodology to predict drum failures in WHC-SD-SQA-ANAL-501, 'Fire Protection Guide for Waste Drum Storage Array,'' September 1996. Three drum failure modes were observed from the test reported in WHC-SD-WM-TRP-246. They consisted of seal failure, lid warping, and catastrophic lid ejection. There was no discernible failure criterion that distinguished one failure mode from another. Hence, all three failure modes were treated equally for the purpose of determining the number of failed drums. General observations from the results of the test are as follows: (lg b ullet) Trash expulsion was negligible. (lg b ullet) Flame impingement was identified as the main cause for failure. (lg b ullet) The range of drum temperatures at failure was 600 C to 800 C. This is above the yield strength temperature for steel, approximately 540 C (1,000 F). (lg b ullet) The critical heat flux required for failure is above 45 kW/m 2 . (lg b ullet) Fire propagation from one drum to the next was not observed. The statistical evaluation of the test results using, for example, the student's t-distribution, will demonstrate that the failure criteria for TRU waste drums currently employed at nuclear facilities are very conservative relative to the large-scale test results. Hence, the safety analysis utilizing the general criteria described in the five bullets above will lead to a technically robust and defensible product that bounds the potential consequences from postulated

  7. SULTAN test facility: Summary of recent results

    International Nuclear Information System (INIS)

    Stepanov, Boris; Bruzzone, Pierluigi; Sedlak, Kamil; Croari, Giancarlo

    2013-01-01

    The test campaigns of the ITER conductors in the SULTAN test facility re-started in December 2011 after three months break. The main focus of the activities is about the qualification tests of the Central Solenoid (CS) conductors, with three different samples for a total six variations of strand suppliers and cable layouts. In 2012, five Toroidal Field (TF) conductor samples have also been tested as part of the supplier and process qualification phase of the European, Korean, Chinese and Russian Federation Agencies. A summary of the test results for all the ITER samples tested in the last period is presented, including an updated statistics of the broad transition, the performance degradation and the impact of layout variations. The role of SULTAN test facility during the ITER construction is reviewed, and the load of work for the next three years is anticipated

  8. Results From The Salt Disposition Project Next Generation Solvent Demonstration Plan

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Fondeur, F. F. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Taylor-Pashow, K. M.L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-04-02

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), Caustic Wash Tank (CWT) and Solvent Hold Tank (SHT) samples were taken throughout the Next Generation Solvent (NGS) Demonstration Plan. These samples were analyzed and the results are reported. SHT: The solvent behaved as expected, with no bulk changes in the composition over time, with the exception of the TOA and TiDG. The TiDG depletion is higher than expected, and consideration must be taken on the required rate of replenishment. Monthly sampling of the SHT is warranted. If possible, additional SHT samples for TiDG analysis (only) would help SRNL refine the TiDG degradation model. CWT: The CWT samples show the expected behavior in terms of bulk chemistry. The 137Cs deposited into the CWT varies somewhat, but generally appears to be lower than during operations with the BOBCalix solvent. While a few minor organic components were noted to be present in the Preliminary sample, at this time these are thought to be artifacts of the sample preparation or may be due to the preceding solvent superwash. DSSHT: The DSSHT samples show the predicted bulk chemistry, although they point towards significant dilution at the front end of the Demonstration. The 137Cs levels in the DSSHT are much lower than during the BOBCalix operations, which is the expected observation. SEHT: The SEHT samples represent the most different output of all four of the outputs from MCU. While the bulk chemistry is as expected, something is causing the pH of the SEHT to be higher than what would be predicted from a pure stream of 0.01 M boric acid. There are several possible different reasons for this, and SRNL is in the process of investigating. Other than the pH issue, the SEHT is as predicted. In summary, the NGS Demonstration Plan samples indicate that the MCU system, with the Blend Solvent, is operating as expected. The only issue of concern regards the pH of the SEHT, and SRNL is in the process of investigating

  9. Small-Scale Spray Releases: Initial Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, Lenna A.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, Garrett N.; Kurath, Dean E.; Buchmiller, William C.; Smith, Dennese M.; Blanchard, Jeremy; Song, Chen; Daniel, Richard C.; Wells, Beric E.; Tran, Diana N.; Burns, Carolyn A.

    2012-11-01

    One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of anti-foam agents was assessed with most of the simulants. Orifices included round holes and

  10. Results from laboratory and field testing of nitrate measuring spectrophotometers

    Science.gov (United States)

    Snazelle, Teri T.

    2015-01-01

    Five ultraviolet (UV) spectrophotometer nitrate analyzers were evaluated by the U.S. Geological Survey (USGS) Hydrologic Instrumentation Facility (HIF) during a two-phase evaluation. In Phase I, the TriOS ProPs (10-millimeter (mm) path length), Hach NITRATAX plus sc (5-mm path length), Satlantic Submersible UV Nitrate Analyzer (SUNA, 10-mm path length), and S::CAN Spectro::lyser (5-mm path length) were evaluated in the HIF Water-Quality Servicing Laboratory to determine the validity of the manufacturer's technical specifications for accuracy, limit of linearity (LOL), drift, and range of operating temperature. Accuracy specifications were met in the TriOS, Hach, and SUNA. The stock calibration of the S::CAN required two offset adjustments before the analyzer met the manufacturer's accuracy specification. Instrument drift was observed only in the S::CAN and was the result of leaching from the optical path insert seals. All tested models, except for the Hach, met their specified LOL in the laboratory testing. The Hach's range was found to be approximately 18 milligrams nitrogen per liter (mg-N/L) and not the manufacturer-specified 25 mg-N/L. Measurements by all of the tested analyzers showed signs of hysteresis in the operating temperature tests. Only the SUNA measurements demonstrated excessive noise and instability in temperatures above 20 degrees Celsius (°C). The SUNA analyzer was returned to the manufacturer at the completion of the Phase II field deployment evaluation for repair and recalibration, and the performance of the sensor improved significantly.

  11. Communication of Pulmonary Function Test Results: A Survey of Patient's Preferences.

    Directory of Open Access Journals (Sweden)

    Debbie Zagami

    Full Text Available Physician-patient communication in patients suffering from common chronic respiratory disease should encompass discussion about pulmonary function test (PFT results, diagnosis, disease education, smoking cessation and optimising inhaler technique. Previous studies have identified that patients with chronic respiratory disease/s often express dissatisfaction about physician communication. Currently there is a paucity of data regarding patient awareness of their PFT results (among those who have undergone PFTs previously or patient preferences about PFT result communication.We undertook a three-month prospective study on outpatients referred to two Pulmonary Function Laboratories. If subjects had undergone PFTs previously, the awareness of their previous test results was evaluated. All subjects were asked about their preferences for PFT result communication. Subjects were determined to have chronic respiratory disease based on their past medical history.300 subjects (50% male with a median age (± SD of 65 (± 14 years participated in the study. 99% of the study participants stated that they were at least moderately interested in knowing their PFT results. 72% (217/300 of the subjects had undergone at least one PFT in the past, 48% of whom stated they had not been made aware of their results. Fewer subjects with chronic respiratory disease preferred that only a doctor discuss their PFT results with them (28% vs. 41%, p = 0.021.Our study demonstrates that while almost all subjects want to be informed of their PFT results, this does not occur in a large number of patients. Many subjects are agreeable for their PFT results to be communicated to them by clinicians other than doctors. Further research is required to develop an efficient method of conveying PFT results that will improve patient satisfaction and health outcomes.

  12. Production LHC HTS power lead test results

    CERN Document Server

    Tartaglia, M; Fehér, S; Huang, Y; Orris, D F; Pischalnikov, Y; Rabehl, Roger Jon; Sylvester, C D; Zbasnik, J

    2005-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under "standard" and "extreme" operating conditions, and the stability of performance across thermal cycles.

  13. Production LHC HTS power lead test results

    International Nuclear Information System (INIS)

    Tartaglia, M.A.; Carcagno, R.H.; Feher, S.; Huang, Y.; Orris, D.F.; Pischalnikov, Y.; Rabehl, R.J.; Sylvester, C.; Zbasnik, J.

    2004-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under ''standard'' and ''extreme'' operating conditions, and the stability of performance across thermal cycles

  14. Recent results on high thermal energy load testing of beryllium for ITER first wall application

    Science.gov (United States)

    Kupriyanov, I. B.; Roedig, M.; Nikolaev, G. N.; Kurbatova, L. A.; Linke, J.; Gervash, A. A.; Giniyatulin, R. N.; Podkovyrov, V. L.; Muzichenko, A. D.; Khimchenko, L.

    2011-12-01

    In this paper, progress in the high heat flux (HHF) qualification testing of TGP-56FW beryllium grade for ITER first wall applications is presented. Two actively cooled Be/CuCrZr brazing mock-ups were tested under complex thermal loading conditions in the electron beam facility JUDITH-1 (step 1: vertical displacement event test at 40 MJ m-2, 0.3 s, 1 shot; step 2: disruption tests at 3 MJ m-2, 1 shot, Δt=5 ms; step 3: repetitive fatigue test at 80 MW m-2, 1000 shots, Δt=25 ms). After testing, metallographic investigations on the microstructure and crack morphology were carried out. The results of these studies of Be tiles are reported and discussed. The overall results of TGP-56FW grade qualification testing have demonstrated the reliable performance capability of TGP-56FW for application as the armor of the ITER first wall. In addition, the results of first experiments with TGP-56FW and S-65C beryllium grades in the QSPA-Be plasma gun facility are also reported. In these experiments, beryllium tiles (80×80×10 mm3) were tested in a hydrogen plasma stream (5 cm in diameter) with pulse duration 0.5 ms and heat loads of 0.5-2 MJ m-2. Experiments were performed at room temperature. The evolution of the surface microstructure and mass loss of beryllium exposed to up to 100 shots is presented.

  15. Recent results on high thermal energy load testing of beryllium for ITER first wall application

    International Nuclear Information System (INIS)

    Kupriyanov, I B; Nikolaev, G N; Kurbatova, L A; Roedig, M; Linke, J; Gervash, A A; Giniyatulin, R N; Podkovyrov, V L; Muzichenko, A D; Khimchenko, L

    2011-01-01

    In this paper, progress in the high heat flux (HHF) qualification testing of TGP-56FW beryllium grade for ITER first wall applications is presented. Two actively cooled Be/CuCrZr brazing mock-ups were tested under complex thermal loading conditions in the electron beam facility JUDITH-1 (step 1: vertical displacement event test at 40 MJ m - 2, 0.3 s, 1 shot; step 2: disruption tests at 3 MJ m - 2, 1 shot, Δt=5 ms; step 3: repetitive fatigue test at 80 MW m - 2, 1000 shots, Δt=25 ms). After testing, metallographic investigations on the microstructure and crack morphology were carried out. The results of these studies of Be tiles are reported and discussed. The overall results of TGP-56FW grade qualification testing have demonstrated the reliable performance capability of TGP-56FW for application as the armor of the ITER first wall. In addition, the results of first experiments with TGP-56FW and S-65C beryllium grades in the QSPA-Be plasma gun facility are also reported. In these experiments, beryllium tiles (80×80×10 mm 3 ) were tested in a hydrogen plasma stream (5 cm in diameter) with pulse duration 0.5 ms and heat loads of 0.5-2 MJ m - 2. Experiments were performed at room temperature. The evolution of the surface microstructure and mass loss of beryllium exposed to up to 100 shots is presented.

  16. Potential for false positive HIV test results with the serial rapid HIV testing algorithm

    Directory of Open Access Journals (Sweden)

    Baveewo Steven

    2012-03-01

    Full Text Available Abstract Background Rapid HIV tests provide same-day results and are widely used in HIV testing programs in areas with limited personnel and laboratory infrastructure. The Uganda Ministry of Health currently recommends the serial rapid testing algorithm with Determine, STAT-PAK, and Uni-Gold for diagnosis of HIV infection. Using this algorithm, individuals who test positive on Determine, negative to STAT-PAK and positive to Uni-Gold are reported as HIV positive. We conducted further testing on this subgroup of samples using qualitative DNA PCR to assess the potential for false positive tests in this situation. Results Of the 3388 individuals who were tested, 984 were HIV positive on two consecutive tests, and 29 were considered positive by a tiebreaker (positive on Determine, negative on STAT-PAK, and positive on Uni-Gold. However, when the 29 samples were further tested using qualitative DNA PCR, 14 (48.2% were HIV negative. Conclusion Although this study was not primarily designed to assess the validity of rapid HIV tests and thus only a subset of the samples were retested, the findings show a potential for false positive HIV results in the subset of individuals who test positive when a tiebreaker test is used in serial testing. These findings highlight a need for confirmatory testing for this category of individuals.

  17. Large-Scale Spray Releases: Initial Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Schonewill, Philip P.; Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.; Kurath, Dean E.; Adkins, Harold E.; Billing, Justin M.; Burns, Carolyn A.; Davis, James M.; Enderlin, Carl W.; Fischer, Christopher M.; Jenks, Jeromy WJ; Lukins, Craig D.; MacFarlan, Paul J.; Shutthanandan, Janani I.; Smith, Dennese M.

    2012-12-01

    One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of anti-foam agents was assessed with most of the simulants. Orifices included round holes and

  18. FY 1992 Research and development of ceramic gas turbines. Reliability demonstration tests for ceramic members; 1992 nendo ceramic gas turbine no kenkyu kaihatsu seika hokokusho. Ceramic buzai no shinraisei kakusho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-05-01

    The creep rupture demonstration testing methods and non-destructive testing technologies are investigated for ceramic members, to promote development of ceramic gas turbines (CGT's), and the FY 1992 results are reported. For creep rupture demonstration testing methods, 3 types of silicon nitride as the CGT rotor materials are tested for tensile creep rupture at a rated temperature level (1200 degrees C) in the operating atmosphere (in the air), and applicability of the Larson-Miller method to ceramic members is investigated. It is found that Larson-Miller index, determined for each test temperature, is useful for explaining the test results, and analysis of the data by the Larson-Miller method is applicable to prediction of creep rupture life for specific members. For the non-destructive testing technologies to be applied to CGT members, the studied items include determination of white X-ray absorption coefficient by the film method and optimization of X-ray photographing, and the good results are produced. (NEDO)

  19. 40 CFR 53.51 - Demonstration of compliance with design specifications and manufacturing and test requirements.

    Science.gov (United States)

    2010-07-01

    ... Methods and Class I and Class II Equivalent Methods for PM2.5 or PM10â2.5 § 53.51 Demonstration of... standard specification 8625F, Type II, Class I (reference 4 in appendix A of this subpart) in the same way... specifications and manufacturing and test requirements. 53.51 Section 53.51 Protection of Environment...

  20. Radar Cross Section (RCS) Certification for Static and Dynamic RCS Measurement Facilities. Volume 2: DOD RCS Demonstration Program Results

    National Research Council Canada - National Science Library

    2001-01-01

    ...) 46 Test Group, in cooperation with the RCC/SMSG Radar Committee, the demonstration program described herein was entirely successful and should lay the groundwork for similar technical or laboratory...

  1. Demonstration test and evaluation of Ultraviolet/Ultraviolet Catalyzed Peroxide Oxidation for Groundwater Remediation at Oak Ridge K-25 Site

    International Nuclear Information System (INIS)

    1994-03-01

    We demonstrated, tested and evaluated a new ultraviolet (UV) lamp integrated with an existing commercial technology employing UV catalyzed peroxide oxidation to destroy organics in groundwater at an Oak Ridge K-25 site. The existing commercial technology is the perox-pure trademark process of Peroxidation Systems Incorporated (PSI) that employs standard UV lamp technology to catalyze H 2 O 2 into OH radicals, which attack many organic molecules. In comparison to classical technologies for remediation of groundwater contaminated with organics, the perox-pure trademark process not only is cost effective but also reduces contaminants to harmless by-products instead of transferring the contaminants from one medium to another. Although the perox-pure trademark process is cost effective against many organics, it is not effective for some organic contaminants of interest to DOE such as TCA, which has the highest concentration of the organics at the K-25 test site. Contaminants such as TCA are treated more readily by direct photolysis using short wavelength UV light. WJSA has been developing a unique UV lamp which is very efficient in the short UV wavelength region. Consequently, combining this UV lamp with the perox-pure trademark process results in a means for treating essentially all organic contaminants. In the program reported here, the new UV lamp lifetime was improved and the lamp integrated into a PSI demonstration trailer. Even though this UV lamp operated at less than optimum power and UV efficiency, the destruction rate for the highest concentration organic (TCA) was more than double that of the commercial unit. An optimized UV lamp may double again the destruction rate; i.e., a factor of four greater than the commercial system. The demonstration at K-25 included tests with (1) the commercial PSI system, (2) the new UV lamp-based system and (3) the commercial PSI and new UV lamp systems in series

  2. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  3. Two tests demonstrating the effects of small blasts inside explosives storage magazines

    Energy Technology Data Exchange (ETDEWEB)

    Ollerenshaw, J.

    2010-02-15

    This paper described 2 tests conducted to determine the effects of detonating small quantities of explosives in a storage magazine. The aim of the study was to determine the correct measures for reducing the potential for injury and damage in areas surrounding storage magazines. The study involved the detonation of 5 kg and 20 kg of pentolite in type 2 and type 4 magazines. A wall of heavy concrete blocks was erected around 2 sides of the magazine in each of the tests. Surveys of the test sites were performed after each trial, and the results of the tests were documented with video recordings and photographs. Maps of major metal fragments were prepared, and free-field pressure transducers and high speed video data were used to measure initial fragment velocities. The study showed that while the walls collapsed in both trials, they prevented heavy metal fragments from escaping the blast site. Results of the tests will be used to educate members of the explosives industry in Canada and to ensure that safety distances for explosives storage are maintained. 5 refs., 8 tabs., 56 figs.

  4. Full-scale demonstration. Fire testing of a system for penetration sealing based on foamed silicone elastomer: Studsvik 77-05-26

    International Nuclear Information System (INIS)

    Brown, A.

    1978-06-01

    Testing of a system for making fire retardant penetration seals based on foamed-in-place silicone elastomer is described. The report covers - Concept of fire retardant penetration seals and the Chemtrol system, Design FC 225 - Account of materials used to prepare seals and method of application - Test assembly and full-scale facility at Studsvik - Classification of seals used in demonstration - Diagrams of seals and photographs taken after demonstration

  5. Full-scale demonstration. Fire testing of a system for penetration sealing based on foamed silicone elastomer: Studsvik 77-05-26

    International Nuclear Information System (INIS)

    Brown, A.

    1978-06-01

    Testing of a system for making fire retardant penetration seals based on foamed-in-place silicone elastomer is described. The report covers - Concept of fire retardant penetration seals and the Chemtrol system, Design FC 225 - Account of materials used to prepare seals and method of application - Test assembly and full-scale facility at Studsvik - Classification of seals used in demonstration - Diagrams of seals and photographs taken after demonstration (author)

  6. Large-scale dynamic compaction demonstration using WIPP salt: Fielding and preliminary results

    International Nuclear Information System (INIS)

    Ahrens, E.H.; Hansen, F.D.

    1995-10-01

    Reconsolidation of crushed rock salt is a phenomenon of great interest to programs studying isolation of hazardous materials in natural salt geologic settings. Of particular interest is the potential for disaggregated salt to be restored to nearly an impermeable state. For example, reconsolidated crushed salt is proposed as a major shaft seal component for the Waste Isolation Pilot Plant (WIPP) Project. The concept for a permanent shaft seal component of the WIPP repository is to densely compact crushed salt in the four shafts; an effective seal will then be developed as the surrounding salt creeps into the shafts, further consolidating the crushed salt. Fundamental information on placement density and permeability is required to ensure attainment of the design function. The work reported here is the first large-scale compaction demonstration to provide information on initial salt properties applicable to design, construction, and performance expectations. The shaft seals must function for 10,000 years. Over this period a crushed salt mass will become less permeable as it is compressed by creep closure of salt surrounding the shaft. These facts preclude the possibility of conducting a full-scale, real-time field test. Because permanent seals taking advantage of salt reconsolidation have never been constructed, performance measurements have not been made on an appropriately large scale. An understanding of potential construction methods, achievable initial density and permeability, and performance of reconsolidated salt over time is required for seal design and performance assessment. This report discusses fielding and operations of a nearly full-scale dynamic compaction of mine-run WIPP salt, and presents preliminary density and in situ (in place) gas permeability results

  7. Design and Beam Test Results for the sPHENIX Electromagnetic and Hadronic Calorimeter Prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Aidala, C.A.; et al.

    2017-04-05

    The sPHENIX experiment at the Relativistic Heavy Ion Collider (RHIC) will perform high precision measurements of jets and heavy flavor observables for a wide selection of nuclear collision systems, elucidating the microscopic nature of strongly interacting matter ranging from nucleons to the strongly coupled quark-gluon plasma. A prototype of the sPHENIX calorimeter system was tested at the Fermilab Test Beam Facility as experiment T-1044 in the spring of 2016. The electromagnetic calorimeter (EMCal) prototype is composed of scintillating fibers embedded in a mixture of tungsten powder and epoxy. The hadronic calorimeter (HCal) prototype is composed of tilted steel plates alternating with plastic scintillator. Results of the test beam reveal the energy resolution for electrons in the EMCal is $2.8\\%\\oplus~15.5\\%/\\sqrt{E}$ and the energy resolution for hadrons in the combined EMCal plus HCal system is $13.5\\%\\oplus 64.9\\%/\\sqrt{E}$. These results demonstrate that the performance of the proposed calorimeter system is consistent with \\geant simulations and satisfies the sPHENIX specifications.

  8. "Know Your Status": results from a novel, student-run HIV testing initiative on college campuses.

    Science.gov (United States)

    Milligan, Caitlin; Cuneo, C Nicholas; Rutstein, Sarah E; Hicks, Charles

    2014-08-01

    Know Your Status (KYS), a novel, student-run program offered free HIV-testing at a private university (PU) and community college (CC). Following completion of surveys of risk behaviors/reasons for seeking testing, students were provided with rapid, oral HIV-testing. We investigated testing history, risk behaviors, and HIV prevalence among students tested during the first three years of KYS. In total, 1408 tests were conducted, 5 were positive: 4/408 CC, 1/1000 PU (1% vs. 0.1%, p=0.01). Three positives were new diagnoses, all black men-who-have-sex-with-men (MSM). Over 50% of students were tested for the first time and 59% reported risk behaviors. CC students were less likely to have used condoms at last sex (a surrogate for risk behavior) compared to PU (OR 0.73, CI [0.54, 0.98]). Race, sexual identity, and sex were not associated with condom use. These results demonstrate that KYS successfully recruited large numbers of previously untested, at-risk students, highlighting the feasibility and importance of testing college populations.

  9. The trigger card system for the MAJORANA DEMONSTRATOR

    Science.gov (United States)

    Thompson, William; Anderson, John; Howe, Mark; Meijer, Sam; Wilkerson, John; Majorana Collaboration

    2014-09-01

    The aim of the MAJORANA DEMONSTRATOR is to demonstrate the feasibility of providing low enough background levels to search for neutrinoless double-beta decay (0 νββ) in an array of germanium detectors enriched to 87% in 76Ge. Currently, it is unknown if this decay process occurs; however, observation of such a decay process would show that lepton number is violated, confirm that neutrinos are Majorana particles, and yield information on the absolute mass scale of the neutrino. With current experimental results indicating a half-life greater than 2 x 1025 years for this decay, the minimization of background events is of critical importance. Utilizing time correlation, coincidence testing is able to reject multi-detector events that may otherwise be mistaken for 0 νββ when viewed independently. Here, we present both the hardware and software of the trigger card system, which provides a common clock to all digitizers and the muon veto system, thereby enabling the rejection of background events through coincidence testing. Current experimental results demonstrate the accuracy of the distributed clock to be within two clock pulses (20 ns) across all system components. A test system is used to validate the data acquisition system. The aim of the MAJORANA DEMONSTRATOR is to demonstrate the feasibility of providing low enough background levels to search for neutrinoless double-beta decay (0 νββ) in an array of germanium detectors enriched to 87% in 76Ge. Currently, it is unknown if this decay process occurs; however, observation of such a decay process would show that lepton number is violated, confirm that neutrinos are Majorana particles, and yield information on the absolute mass scale of the neutrino. With current experimental results indicating a half-life greater than 2 x 1025 years for this decay, the minimization of background events is of critical importance. Utilizing time correlation, coincidence testing is able to reject multi-detector events that may

  10. Interpreting Results from the Standardized UXO Test Sites

    National Research Council Canada - National Science Library

    May, Michael; Tuley, Michael

    2007-01-01

    ...) and the Environmental Security Technology Certification Program (ESCTP) to complete a detailed analysis of the results of testing carried out at the Standardized Unexploded Ordnance (UXO) Test Sites...

  11. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  12. AMORE Mo-99 Spike Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Youker, Amanda J. [Argonne National Lab. (ANL), Argonne, IL (United States); Krebs, John F. [Argonne National Lab. (ANL), Argonne, IL (United States); Quigley, Kevin J. [Argonne National Lab. (ANL), Argonne, IL (United States); Byrnes, James P. [Argonne National Lab. (ANL), Argonne, IL (United States); Rotsch, David A [Argonne National Lab. (ANL), Argonne, IL (United States); Brossard, Thomas [Argonne National Lab. (ANL), Argonne, IL (United States); Wesolowski, Kenneth [Argonne National Lab. (ANL), Argonne, IL (United States); Alford, Kurt [Argonne National Lab. (ANL), Argonne, IL (United States); Chemerisov, Sergey [Argonne National Lab. (ANL), Argonne, IL (United States); Vandegrift, George F. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-09-27

    With funding from the National Nuclear Security Administrations Material Management and Minimization Office, Argonne National Laboratory (Argonne) is providing technical assistance to help accelerate the U.S. production of Mo-99 using a non-highly enriched uranium (non-HEU) source. A potential Mo-99 production pathway is by accelerator-initiated fissioning in a subcritical uranyl sulfate solution containing low enriched uranium (LEU). As part of the Argonne development effort, we are undertaking the AMORE (Argonne Molybdenum Research Experiment) project, which is essentially a pilot facility for all phases of Mo-99 production, recovery, and purification. Production of Mo-99 and other fission products in the subcritical target solution is initiated by putting an electron beam on a depleted uranium (DU) target; the fast neutrons produced in the DU target are thermalized and lead to fissioning of U-235. At the end of irradiation, Mo is recovered from the target solution and separated from uranium and most of the fission products by using a titania column. The Mo is stripped from the column with an alkaline solution. After acidification of the Mo product solution from the recovery column, the Mo is concentrated (and further purified) in a second titania column. The strip solution from the concentration column is then purified with the LEU Modified Cintichem process. A full description of the process can be found elsewhere [1–3]. The initial commissioning steps for the AMORE project include performing a Mo-99 spike test with pH 1 sulfuric acid in the target vessel without a beam on the target to demonstrate the initial Mo separation-and-recovery process, followed by the concentration column process. All glovebox operations were tested with cold solutions prior to performing the Mo-99 spike tests. Two Mo-99 spike tests with pH 1 sulfuric acid have been performed to date. Figure 1 shows the flow diagram for the remotely operated Mo-recovery system for the AMORE project

  13. Future launcher demonstrator. Challenge and pathfinder

    Science.gov (United States)

    Kleinau, W.; Guerra, L.; Parkinson, R. C.; Lieberherr, J. F.

    1996-02-01

    For future and advanced launch vehicles emphasis is focused on single-stage-to-orbit (SSTO) concepts and on completely reusable versions with the goal to reduce the recurrent launch cost, to improve the mission success probability and also safety for the space transportation of economically attractive payloads into Low Earth Orbit. Both issues, the SSTO launcher and the low cost reusability are extremely challenging and cannot be proven by studies and on-ground tests alone. In-flight demonstration tests are required to verify the assumptions and the new technologies, and to justify the new launcher-and operations-concepts. Because a number of SSTO launch vehicles are currently under discussion in terms of configurations and concepts such as winged vehicles for vertical or horizontal launch and landing (from ground or a flying platform), or wingless vehicles for vertical take-off and landing, and also in terms of propulsion (pure rockets or a combination of air breathing and rocket engines), an experimental demonstrator vehicle appears necessary in order to serve as a pathfinder in this area of multiple challenges. A suborbital Reusable Rocket Launcher Demonstrator (RRLD) has been studied recently by a European industrial team for ESA. This is a multipurpose, evolutionary demonstrator, conceived around a modular approach of incremental improvements of subsystems and materials, to achieve a better propellant mass fraction i.e. a better performance, and specifically for the accomplishment of an incremental flight test programme. While the RRLD basic test programme will acquire knowledge about hypersonic flight, re-entry and landing of a cryogenic rocket propelled launcher — and the low cost reusability (short turnaround on ground) in the utilization programme beyond basic testing, the RRLD will serve as a test bed for generic testing of technologies required for the realization of an SSTO launcher. This paper will present the results of the European RRLD study which

  14. 42 CFR 493.1281 - Standard: Comparison of test results.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Comparison of test results. 493.1281 Section 493.1281 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Testing Analytic Systems § 493.1281 Standard: Comparison of test results. (a) If a laboratory performs the...

  15. Testing Systems and Results for Advanced Nuclear Fuel Materials

    International Nuclear Information System (INIS)

    Rooyen, I.J. van; Griffith, G.W.; Garnier, J.E.

    2012-01-01

    Light Water Reactor Sustainability (LWRS) Program Advanced LWR Nuclear Fuel Development (ALFD) Pathway. Development and testing of high performance fuel cladding identified as high priority to support: enhancement of fuel performance, reliability, and reactor safety. One of the technologies being examined is an advanced fuel cladding made from ceramic matrix composites (CMC) utilizing silicon carbide (SiC) as a structural material supplementing a commercial Zircaloy-4 (Zr-4) tube. A series of out-of-pile tests to fully characterize the SiC CMC hybrid design to produce baseline data. The planned tests are intended to either produce quantitative data or to demonstrate the properties required to achieve two initial performance conditions relative to standard zircaloybased cladding: decreased hydrogen uptake (corrosion) and decreased fretting of the cladding tube under normal operating and postulated accident conditions. These two failure mechanisms account for approximately 70% of all in-pile failures of LWR commercial fuel assemblies

  16. NASA Technology Demonstrations Missions Program Overview

    Science.gov (United States)

    Turner, Susan

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry

  17. Michigan Oncology Medical Home Demonstration Project: First-Year Results.

    Science.gov (United States)

    Kuntz, Gordon; Tozer, Jane; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-03-01

    The Michigan Oncology Medical Home Demonstration Project (MOMHDP) is an innovative multipractice oncology medical home model, supported by payment reform. Sponsored by Priority Health, Physician Resource Management, and ION Solutions, MOMHDP includes four oncology practices and 29 physicians. Oncology practices used existing technologies, with MOMHDP providing evidence-based treatment guideline selection and compliance tracking, automated physician order entry, a patient portal, symptom management/standardized nurse triage, and advance care planning. To support changes in care and administrative models and to focus on quality, MOMHDP modifies provider payments. The program replaces the average sales price payment methodology with a drug acquisition reimbursement plus a care management fee, calculated to increase total drug reimbursement. Additionally, it reimburses for chemotherapy and treatment planning and advance care planning consultation. There is also a shared savings opportunity. MOMHDP will be enhanced in its second year to include a survivorship program, patient distress screening, imaging guidelines, and standardized patient satisfaction surveys. Priority Health patients receiving chemotherapy for a cancer diagnosis were recruited to the program. Results for this group were compared with a control group of patients from a prior period. In addition to the financial results, the project also accomplished the following: (1) adherence to practice-selected guidelines, (2) institution of advance care planning, (3) effective and standardized symptom management; and (4) payment reform. We have identified a number of critical success factors: strong payer/provider collaboration built on trust through transparent use and cost data; timing of clinical standardization must come from the practices, so they can effectively absorb new approaches; having comprehensive, written program documentation and consistently applied training facilitate practice understanding

  18. Hawaiian Electric Advanced Inverter Test Plan - Result Summary

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, Anderson; Nelson, Austin; Prabakar, Kumaraguru; Nagarajan, Adarsh

    2016-10-14

    This presentation is intended to share the results of lab testing of five PV inverters with the Hawaiian Electric Companies and other stakeholders and interested parties. The tests included baseline testing of advanced inverter grid support functions, as well as distribution circuit-level tests to examine the impact of the PV inverters on simulated distribution feeders using power hardware-in-the-loop (PHIL) techniques. hardware-in-the-loop (PHIL) techniques.

  19. Results of bench-scale plasma system testing in support of the Plasma Hearth Process

    International Nuclear Information System (INIS)

    Leatherman, G.L.; Cornelison, C.; Frank, S.

    1996-01-01

    The Plasma Hearth Process (PHP) is a high-temperature process that destroys hazardous organic components and stabilizes the radioactive components and hazardous metals in a leach-resistant vitreous slag waste form. The PHP technology development program is targeted at mixed waste that cannot be easily treated by conventional means. For example, heterogeneous debris, which may contain hazardous organics, toxic metals, and radionuclides, is difficult to characterize and cannot be treated with conventional thermal, chemical, or physical treatment methods. A major advantage of the PHP over other plasma processes is its ability to separate nonradioactive, non-hazardous metals from the non-metallic and radioactive components which are contained in the vitreous slag. The overall PHP program involves the design, fabrication, and operation of test hardware to demonstrate and certify that the PHP concept is viable for DOE waste treatment. The program involves bench-scale testing of PHP equipment in radioactive service, as well as pilot-scale demonstration of the PHP concept using nonradioactive, surrogate test materials. The fate of secondary waste streams is an important consideration for any technology considered for processing mixed waste. The main secondary waste stream generated by the PHP is flyash captured by the fabric- filter baghouse. The PHP concept is that flyash generated by the process can, to a large extent, be treated by processing this secondary waste stream in the PHP. Prior to the work presented in the paper, however, the PHP project has not quantitatively demonstrated the ability to treat PHP generated flyash. A major consideration is the quantity of radionuclides and RCRA-regulated metals in the flyash that can be retained the resultant waste form

  20. Characterization of High-Power Turbomachinery Tilting Pad Journal Bearings: First Results Obtained on a Novel Test Bench

    Directory of Open Access Journals (Sweden)

    Enrico Ciulli

    2018-01-01

    Full Text Available Tilting pad journal bearings are usually employed in turbomachines for their stable behavior at high rotational speeds. Devoted test rigs have been realized to validate the predictions of theoretical models. However, the design of new high-performance and large-size bearings needs to be supported by experimental investigations on high-performance large test rigs. The main characteristics of a recently built facility for testing large tilting pad journal bearings with diameters from 150 to 300 mm are described in this work. The test rig is versatile and can be used to test bearings of different size, configurations and to investigate the influence of many parameters, even the effect of misalignment. Sample results of the static characterization of a four-pad high-performance tilting pad journal bearing are reported evidencing some transient effects. A few sample dynamic results are also reported. The presented experimental results demonstrated the capabilities of the rig for investigating the static and the dynamic characteristics of the bearings accurately measuring slow and fast variables.

  1. X-Ray Microtomography (μCT as a Useful Tool for Visualization and Interpretation of Shear Strength Test Results

    Directory of Open Access Journals (Sweden)

    Stefaniuk Damian

    2015-02-01

    Full Text Available The paper demonstrates the applicability of X-ray microtomography (ìCT to analysis of the results of shear strength examinations of clayey soils. The method of X-ray three-dimensional imaging offers new possibilities in soil testing. The work focuses on a non-destructive method of evaluation of specimen quality used in shear tests and mechanical behavior of soil. The paper presents the results of examination of 4 selected clayey soils. Specimens prepared for the triaxial test have been scanned using ìCT before and after the triaxial compression tests. The shear strength parameters of the soils have been estimated. Changes in soil structure caused by compression and shear failure have been presented as visualizations of the samples tested. This allowed for improved interpretation and evaluation of soil strength parameters and recognition of pre-existing fissures and the exact mode of failure. Basic geometrical parameters have been determined for selected cross-sections of specimens after failure. The test results indicate the utility of the method applied in soil testing.

  2. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 8 discusses Control System SOT Tests Results and Analysis Report. This is a continuation of Book 7

  3. Automatically explaining machine learning prediction results: a demonstration on type 2 diabetes risk prediction.

    Science.gov (United States)

    Luo, Gang

    2016-01-01

    Predictive modeling is a key component of solutions to many healthcare problems. Among all predictive modeling approaches, machine learning methods often achieve the highest prediction accuracy, but suffer from a long-standing open problem precluding their widespread use in healthcare. Most machine learning models give no explanation for their prediction results, whereas interpretability is essential for a predictive model to be adopted in typical healthcare settings. This paper presents the first complete method for automatically explaining results for any machine learning predictive model without degrading accuracy. We did a computer coding implementation of the method. Using the electronic medical record data set from the Practice Fusion diabetes classification competition containing patient records from all 50 states in the United States, we demonstrated the method on predicting type 2 diabetes diagnosis within the next year. For the champion machine learning model of the competition, our method explained prediction results for 87.4 % of patients who were correctly predicted by the model to have type 2 diabetes diagnosis within the next year. Our demonstration showed the feasibility of automatically explaining results for any machine learning predictive model without degrading accuracy.

  4. Evaluation of ring tensile test results

    International Nuclear Information System (INIS)

    Chatterjee, S.; Anantharaman, S.; Balakrishnan, K.S.; Sivaramakrish, K.S.

    1990-01-01

    Ring specimens of 5-mm width cut from Zircaloy-2 cladding of reactor operated fuel elements that had experienced 5000 to 15,000 MWD/T of fuel burnup were subjected to ring tensile testing. The true stress-true strain data points up to the onset of necking from the individual load-elongation curves of these specimens were used as input data in Voce's equation. The results reveal that the uniform elongation (UE) values generated using Voce's equation were within (UE-2)% of the experimental percent uniform elongation (UE%). The corresponding ultimate tensile strength values were within ±1%. The uncertainty inherently associated in the determination of gauge length introduces extraneous deformation in the rings tested. Previous results had shown that a 14% increase in cladding diameter caused the gauge length to increase by 40%. To simulate the contribution of extraneous deformation due to an increase in cladding diameter, an analysis of the variation of the tensile parameters (uniform elongation and ultimate tensile strength) due to increase in the gauge length in the range of 10 to 40% was carried out. The results are discussed

  5. 688,112 statistical results : Content mining psychology articles for statistical test results

    NARCIS (Netherlands)

    Hartgerink, C.H.J.

    2016-01-01

    In this data deposit, I describe a dataset that is the result of content mining 167,318 published articles for statistical test results reported according to the standards prescribed by the American Psychological Association (APA). Articles published by the APA, Springer, Sage, and Taylor & Francis

  6. Estimation of the level of anxiety in rats: differences in results of open-field test, elevated plus-maze test, and Vogel's conflict test.

    Science.gov (United States)

    Sudakov, S K; Nazarova, G A; Alekseeva, E V; Bashkatova, V G

    2013-07-01

    We compared individual anxiety assessed by three standard tests, open-field test, elevated plus-maze test, and Vogel conflict drinking test, in the same animals. No significant correlations between the main anxiety parameters were found in these three experimental models. Groups of animals with high and low anxiety rats were formed by a single parameter and subsequent selection of two extreme groups (10%). It was found that none of the tests could be used for reliable estimation of individual anxiety in rats. The individual anxiety level with high degree of confidence was determined in high-anxiety and low-anxiety rats demonstrating behavioral parameters above and below the mean values in all tests used. Therefore, several tests should be used for evaluation of the individual anxiety or sensitivity to emotional stress.

  7. Progress Testing for Medical Students at the University of Auckland: Results from the First Year of Assessments

    Directory of Open Access Journals (Sweden)

    Steven Lillis

    2014-01-01

    Full Text Available Background Progress testing is a method of assessing longitudinal progress of students using a single best answer format pitched at the standard of a newly graduated doctor. Aim To evaluate the results of the first year of summative progress testing at the University of Auckland for Years 2 and 4 in 2013. SUBJECTS: Two cohorts of medical students from Years 2 and 4 of the Medical Program. Methods A survey was administered to all involved students. Open text feedback was also sought. Psychometric data were collected on test performance, and indices of reliability and validity were calculated. Results The three tests showed increased mean scores over time. Reliability of the assessments was uniformly high. There was good concurrent validity. Students believe that progress testing assists in integrating science with clinical knowledge and improve learning. Year 4 students reported improved knowledge retention and deeper understanding. Conclusion Progress testing has been successfully introduced into the Faculty for two separate year cohorts and results have met expectations. Other year cohorts will be added incrementally. Recommendation Key success factors for introducing progress testing are partnership with an experienced university, multiple and iterative briefings with staff and students as well as demonstrating the usefulness of progress testing by providing students with detailed feedback on performance.

  8. Pilot project - demonstration of capabilities and benefits of bridge load rating through physical testing : tech transfer summary.

    Science.gov (United States)

    2013-08-01

    This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...

  9. Preliminary results of steel containment vessel model test

    International Nuclear Information System (INIS)

    Matsumoto, T.; Komine, K.; Arai, S.

    1997-01-01

    A high pressure test of a mixed-scaled model (1:10 in geometry and 1:4 in shell thickness) of a steel containment vessel (SCV), representing an improved boiling water reactor (BWR) Mark II containment, was conducted on December 11-12, 1996 at Sandia National Laboratories. This paper describes the preliminary results of the high pressure test. In addition, the preliminary post-test measurement data and the preliminary comparison of test data with pretest analysis predictions are also presented

  10. Field Lysimeter Investigations - test results: Low-Level Waste Data Base Development Program: Test results for fiscal years 1994-1995

    International Nuclear Information System (INIS)

    McConnell, J.W. Jr.; Rodgers, R.D.; Hilton, L.D.; Neilson, R.M. Jr.

    1996-06-01

    The Field Lysimeter Investigations: Low-Level Waste Data Base Development Program, funded by the U.S. Nuclear Regulatory Commission (NRC), is (1) studying the degradation effects in EPICOR-II organic ion-exchange resins caused by radiation, (2) examining the adequacy of test procedures recommended in the Branch Technical Position on Waste Form to meet the requirements of 10 CFR 61 using solidified EPICOR-II resins, (3) obtaining performance information on solidified EPICOR-II ion-exchange resins in a disposal environment, and (4) determining the condition of EPICOR-II liners. Results of the final 2 (10 total) years of data acquisition from operation of the field testing are presented and discussed. During the continuing field testing, both portland type I-II cement and Dow vinyl ester-styrene waste forms are being tested in lysimeter arrays located at Argonne National Laboratory-East in Illinois and at Oak Ridge National Laboratory. The experimental equipment is described and results of waste form characterization using tests recommended by the NRC's open-quotes Technical Position on Waste Formclose quotes are presented. The study is designed to provide continuous data on nuclide release and movement, as well as environmental conditions, over a 20-year period. At the end of the tenth year, the experiment was closed down. Examination of soil and waste forms is planned to be conducted next and will be reported later

  11. Early results of gate valve flow interruption blowdown tests

    International Nuclear Information System (INIS)

    DeWall, K.G.

    1988-01-01

    The preliminary results of the USNRC/INEL high-energy BWR line break flow interruption testing are presented. Two representative nuclear valve assemblies were cycled under design basis Reactor Water Cleanup pipe break conditions to provide input for the technical basis for resolving the Nuclear Regulatory Commission's Generic Issue 87. The effects of the blowdown hydraulic loadings on valve operability, especially valve closure stem forces, were studied. The blowdown tests showed that, given enough thrust, typical gate valves will close against the high flow resulting from a line break. The tests also showed that proper operator sizing depends on the correct identification of values for the sizing equation. Evidence exists that values used in the past may not be conservative for all valve applications. The tests showed that improper operator lock ring installation following test or maintenance can invalidate in-situ test results and prevent the valve from performing its design function. 2 refs., 12 figs., 2 tabs

  12. Potential for false positive HIV test results with the serial rapid HIV testing algorithm.

    Science.gov (United States)

    Baveewo, Steven; Kamya, Moses R; Mayanja-Kizza, Harriet; Fatch, Robin; Bangsberg, David R; Coates, Thomas; Hahn, Judith A; Wanyenze, Rhoda K

    2012-03-19

    Rapid HIV tests provide same-day results and are widely used in HIV testing programs in areas with limited personnel and laboratory infrastructure. The Uganda Ministry of Health currently recommends the serial rapid testing algorithm with Determine, STAT-PAK, and Uni-Gold for diagnosis of HIV infection. Using this algorithm, individuals who test positive on Determine, negative to STAT-PAK and positive to Uni-Gold are reported as HIV positive. We conducted further testing on this subgroup of samples using qualitative DNA PCR to assess the potential for false positive tests in this situation. Of the 3388 individuals who were tested, 984 were HIV positive on two consecutive tests, and 29 were considered positive by a tiebreaker (positive on Determine, negative on STAT-PAK, and positive on Uni-Gold). However, when the 29 samples were further tested using qualitative DNA PCR, 14 (48.2%) were HIV negative. Although this study was not primarily designed to assess the validity of rapid HIV tests and thus only a subset of the samples were retested, the findings show a potential for false positive HIV results in the subset of individuals who test positive when a tiebreaker test is used in serial testing. These findings highlight a need for confirmatory testing for this category of individuals.

  13. Experimental test results of multi-channel test rig of T1 test section, 5

    International Nuclear Information System (INIS)

    Hino, Ryutaro; Takase, Kazuyuki; Miyamoto, Yoshiaki

    1990-09-01

    Channel blockage test on a fuel column of the high temperature engineering test reactor (HTTR) has been performed under the helium gas atmosphere at a high temperature and a high pressure in order to obtain safety data on flow rate and temperature distributions in the fuel column with the multi-channel test rig of the fuel stack test section (T 1 ) in HENDEL. In the test, one of 12 fuel channels was blockaded to 90% of flow area at the channel inlet. Experimental results showed that the helium gas flow rate in the blockaded channel was 28%∼33% lower than the average flow rate for Reynolds number from 2300 to 14000 in isothermal flow. When simulated fuel rods were heated, the flow rate in the blockaded channel did not decrease down in comparison with the isothermal flow. This is due to that the heat generated in the fuel rods conducts to the other fuel channels in graphite fuel blocks, so that accelerated pressure losses in the fuel channels change with helium gas temperatures. (author)

  14. Demonstration testing and evaluation of in situ soil heating. Revision 1, Demonstration system design

    International Nuclear Information System (INIS)

    Dev, H.

    1994-01-01

    Over the last nine years IIT Research Institute (IITRI) has been developing and testing the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. The vaporized contaminants, water vapor and air are recovered from the heated zone by means of a vacuum manifold system which collects gases from below surface as well as from the soil surface. A vapor barrier is used to prevent fugitive emissions of the contaminants and to control air infiltration to minimize dilution of the contaminant gases and vapors. The recovered gases and vapors are conveyed to an on site vapor treatment system for the clean up of the vent gases. Electrical energy is applied to the soil by forming an array of electrodes in the soil which are electrically interconnected and supplied with power. The electrodes are placed in drilled bore holes which are made through the contaminated zone. There are two versions of the in situ heating and soil treatment process: the f irst version is called the In Situ Radio Frequency (RF) Soil Decontamination Process and the second version is called the In Situ Electromagnetic (EM) Soil Decontamination Process. The first version, the RF Process is capable of heating the soil in a temperature range of 100 degrees to 400 degrees C. The soil temperature in the second version, the EM Process, is limited to the boiling point of water under native conditions. Thus the soil will be heated to a temperature of about 85 degrees to 95 degrees C. In this project IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site due to the fact that most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 degrees to 95 degrees C

  15. Demonstration testing and evaluation of in situ soil heating. Revision 1, Demonstration system design

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.

    1994-08-16

    Over the last nine years IIT Research Institute (IITRI) has been developing and testing the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. The vaporized contaminants, water vapor and air are recovered from the heated zone by means of a vacuum manifold system which collects gases from below surface as well as from the soil surface. A vapor barrier is used to prevent fugitive emissions of the contaminants and to control air infiltration to minimize dilution of the contaminant gases and vapors. The recovered gases and vapors are conveyed to an on site vapor treatment system for the clean up of the vent gases. Electrical energy is applied to the soil by forming an array of electrodes in the soil which are electrically interconnected and supplied with power. The electrodes are placed in drilled bore holes which are made through the contaminated zone. There are two versions of the in situ heating and soil treatment process: the f irst version is called the In Situ Radio Frequency (RF) Soil Decontamination Process and the second version is called the In Situ Electromagnetic (EM) Soil Decontamination Process. The first version, the RF Process is capable of heating the soil in a temperature range of 100{degrees} to 400{degrees}C. The soil temperature in the second version, the EM Process, is limited to the boiling point of water under native conditions. Thus the soil will be heated to a temperature of about 85{degrees} to 95{degrees}C. In this project IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site due to the fact that most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85{degrees} to 95{degrees}C.

  16. The Plasma Hearth Process demonstration project for mixed waste treatment

    International Nuclear Information System (INIS)

    Geimer, R.; Dwight, C.; McClellan, G.

    1994-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Integrated Program (MWIP). Testing to date has yielded encouraging results in displaying potential applications for the PHP technology. Early tests have shown that a wide range of waste materials can be readily processed in the PHP and converted to a vitreous product. Waste materials can be treated in their original container as received at the treatment facility, without pretreatment. The vitreous product, when cooled, exhibits excellent performance in leach resistance, consistently exceeding the Environmental Protection Agency (EPA) Toxicity Characteristic Leaching Procedure (TCLP) requirements. Performance of the Demonstration System during test operations has been shown to meet emission requirements. An accelerated development phase, being conducted at both bench- and pilot-scale on both nonradioactive and radioactive materials, will confirm the viability of the process. It is anticipated that, as a result of this accelerated technology development and demonstration phase, the PHP will be ready for a final field-level demonstration within three years

  17. Impact of Genetic Counseling and Connexin-26 and Connexin-30 Testing on Deaf Identity and Comprehension of Genetic Test Results in a Sample of Deaf Adults: A Prospective, Longitudinal Study

    Science.gov (United States)

    Palmer, Christina G. S.; Boudreault, Patrick; Baldwin, Erin E.; Sinsheimer, Janet S.

    2014-01-01

    Using a prospective, longitudinal study design, this paper addresses the impact of genetic counseling and testing for deafness on deaf adults and the Deaf community. This study specifically evaluated the effect of genetic counseling and Connexin-26 and Connexin-30 genetic test results on participants' deaf identity and understanding of their genetic test results. Connexin-26 and Connexin-30 genetic testing was offered to participants in the context of linguistically and culturally appropriate genetic counseling. Questionnaire data collected from 209 deaf adults at four time points (baseline, immediately following pre-test genetic counseling, 1-month following genetic test result disclosure, and 6-months after result disclosure) were analyzed. Four deaf identity orientations (hearing, marginal, immersion, bicultural) were evaluated using subscales of the Deaf Identity Development Scale-Revised. We found evidence that participants understood their specific genetic test results following genetic counseling, but found no evidence of change in deaf identity based on genetic counseling or their genetic test results. This study demonstrated that culturally and linguistically appropriate genetic counseling can improve deaf clients' understanding of genetic test results, and the formation of deaf identity was not directly related to genetic counseling or Connexin-26 and Connexin-30 genetic test results. PMID:25375116

  18. Caltrans accelerated pavement testing (CAL/APT) program - test results: 1993-1996

    CSIR Research Space (South Africa)

    Nokes, WA

    1997-08-01

    Full Text Available By combining the results of both the HVS and laboratory tests, interpretations of pavement performance are described and recommendations for pavement design and construction have been made to Caltrans....

  19. Finite Element Analysis and Test Results Comparison for the Hybrid Wing Body Center Section Test Article

    Science.gov (United States)

    Przekop, Adam; Jegley, Dawn C.; Rouse, Marshall; Lovejoy, Andrew E.

    2016-01-01

    This report documents the comparison of test measurements and predictive finite element analysis results for a hybrid wing body center section test article. The testing and analysis efforts were part of the Airframe Technology subproject within the NASA Environmentally Responsible Aviation project. Test results include full field displacement measurements obtained from digital image correlation systems and discrete strain measurements obtained using both unidirectional and rosette resistive gauges. Most significant results are presented for the critical five load cases exercised during the test. Final test to failure after inflicting severe damage to the test article is also documented. Overall, good comparison between predicted and actual behavior of the test article is found.

  20. Production Facility Prototype Blower 1000 Hour Test Results II

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Alexander Joseph [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dalmas, Dale Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Frank Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-08

    Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.

  1. Sims Prototype System 2 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The testing, problems encountered, and the results and conclusions obtained from tests performed on the IBM Prototype System, 2, solar hot water system, at the Marshall Space Flight Center Solar Test Facility was described. System 2 is a liquid, non draining solar energy system for supplying domestic hot water to single residences. The system consists of collectors, storage tank, heat exchanger, pumps and associated plumbing and controls.

  2. Preliminary results of durability testing with borosilicate glass compositions

    International Nuclear Information System (INIS)

    Adel-Hadadi, M.; Adiga, R.; Barkatt, Aa.

    1987-01-01

    This is a report on the first year of research conducted at the Vitreous State Laboratory of the Catholic University of America in support of the West Valley Demonstration Project. One objective is the vitrification of liquid waste generated by previous nuclear fuel reprocessing. This work has been directed principally at the problem of glass composition optimization. This has necessitated the development of a coordinated program of glass production, durability measurements, and processability assessment. A small-scale continuous melter has been constructed for melting uranium and thorium containing glasses and for studying glass processing characteristics. Glass viscosities have been measured over a range of temperatures. A large number of glasses have also been produced in small crucible melts. Glass durability has been assessed using four types of leach tests: MCC-3, MCC-1, IAEA/ISO, and pulsed-flow tests. Extensive data from these tests are reported. The data have led to the design of very durable glasses (comparable to the Savannah River Laboratory Defense Waste Reference Glass) which have the requisite waste loading and processing characteristics. 14 refs., 4 figs., 77 tabs

  3. Results of a Long-Term Demonstration of an Optical Multi-Gas Monitor on ISS

    Science.gov (United States)

    Mudgett, Paul; Pilgrim, Jeffrey S.

    2015-01-01

    Previously at SAMAP we reported on the development of tunable diode laser spectroscopy (TDLS) based instruments for measuring small gas molecules in real time. TDLS technology has matured rapidly over the last 5 years as a result of advances in low power diode lasers as well as better detection schemes. In collaboration with two small businesses Vista Photonics, Inc. and Nanoracks LLC, NASA developed a 4 gas TDLS based monitor for an experimental demonstration of the technology on the International Space Station (ISS). Vista invented and constructed the core TDLS sensor. Nanoracks designed and built the enclosure, and certified the integrated monitor as a payload. The device, which measures oxygen, carbon dioxide, ammonia and water vapor, is called the Multi-Gas Monitor (MGM). MGM measures the 4 gases every few seconds and records a 30 second moving average of the concentrations. The relatively small unit draws only 2.5W. MGM was calibrated at NASA-Johnson Space Center in July 2013 and launched to ISS on a Soyuz vehicle in November 2013. Installation and activation of MGM occurred in February 2014, and the unit has been operating nearly continuously ever since in the Japanese Experiment Module. Data is downlinked from ISS about once per week. Oxygen and carbon dioxide data is compared with that from the central Major Constituents Analyzer. Water vapor data is compared with dew point measurements made by sensors in the Columbus module. The ammonia channel was tested by the crew using a commercial ammonia inhalant. MGM is remarkably stable to date. Results of 18 months of operation are presented and future applications including combustion product monitoring are discussed.

  4. Large-Scale Spray Releases: Additional Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Daniel, Richard C.; Gauglitz, Phillip A.; Burns, Carolyn A.; Fountain, Matthew S.; Shimskey, Rick W.; Billing, Justin M.; Bontha, Jagannadha R.; Kurath, Dean E.; Jenks, Jeromy WJ; MacFarlan, Paul J.; Mahoney, Lenna A.

    2013-08-01

    One of the events postulated in the hazard analysis for the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak event involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids that behave as a Newtonian fluid. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and in processing facilities across the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are mostly absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale testing. The small-scale testing and resultant data are described in Mahoney et al. (2012b), and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used

  5. Reliability demonstration of imaging surveillance systems

    International Nuclear Information System (INIS)

    Sheridan, T.F.; Henderson, J.T.; MacDiarmid, P.R.

    1979-01-01

    Security surveillance systems which employ closed circuit television are being deployed with increasing frequency for the protection of property and other valuable assets. A need exists to demonstrate the reliability of such systems before their installation to assure that the deployed systems will operate when needed with only the scheduled amount of maintenance and support costs. An approach to the reliability demonstration of imaging surveillance systems which employ closed circuit television is described. Failure definitions based on industry television standards and imaging alarm assessment criteria for surveillance systems are discussed. Test methods which allow 24 hour a day operation without the need for numerous test scenarios, test personnel and elaborate test facilities are presented. Existing reliability demonstration standards are shown to apply which obviate the need for elaborate statistical tests. The demonstration methods employed are shown to have applications in other types of imaging surveillance systems besides closed circuit television

  6. Fiscal 2000 report on result of R and D of nonmetallic material recycling promotion technology (demonstration test and research, total system technology); 2000 nendo hitetsu kinzokukei sozai recycle sokushin gijutsu kenkyu kaihatsu seika hokokusho. Jissho shiken kenkyu, total system gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    R and D was conducted on advanced recycling technology for aluminum and base metal/rare metal based materials, with fiscal 2000 results compiled. In the research of aluminum recycling technology, on a continuous fractional crystallization process and a purification by zinc removal process, the existing facilities for each demonstrated that they could simulate an aluminum scrap melting process capacity of 1,000 t/month, with a series of initial conditions determined. In the research of total system technology, combined test facilities were completed in which a purification process and a melt cleaning process were integrated. In the research of the recycling technology for base metal/rare metal based materials, a test was carried out by demonstrative facilities, with the aim of establishing copper regeneration technology in which high grade copper is produced using metal/resin based scraps such as shredder dust of automobiles as the materials. In structuring the total system technology, a preliminary survey and environmental load measures were carried out toward the practicability of a comprehensive copper metal collection recycling system. (NEDO)

  7. 7 CFR 91.24 - Reports of test results.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Reports of test results. 91.24 Section 91.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) COMMODITY LABORATORY TESTING PROGRAMS...

  8. Radioactive demonstration of the ''late wash'' Precipitate Hydrolysis Process

    International Nuclear Information System (INIS)

    Bibler, N.E.; Ferrara, D.M.; Ha, B.C.

    1992-01-01

    This report presents results of the radioactive demonstration of the DWPF Precipitate Hydrolysis Process as it would occur in the ''late wash'' flowsheet in the absence of hydroxylamine nitrate. Radioactive precipitate containing Cs-137 from the April, 1983, in-tank precipitation demonstration in Tank 48 was used for these tests

  9. Safety demonstration tests on pressure rise in ventilation system and blower integrity of a fuel-reprocessing plant

    Energy Technology Data Exchange (ETDEWEB)

    Takada, Junichi; Suzuki, Motoe; Tsukamoto, Michio; Koike, Tadao; Nishio, Gunji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1996-12-01

    In JAERI, the demonstration test was carried out as a part of safety researches of the fuel-reprocessing plant using a large-scale facility consist of cells, ducts, dumpers, HEPA filters and a blower, when an explosive burning due to a rapid reaction of thermal decomposition for solvent/nitric acid occurs in a cell of the reprocessing plant. In the demonstration test, pressure response propagating through the facility was measured under a blowing of air from a pressurized tank into the cell in the facility to elucidate an influence of pressure rise in the ventilation system. Consequently, effective pressure decrease in the facility was given by a configuration of cells and ducts in the facility. In the test, transient responses of HEPA filters and the blower by the blowing of air were also measured to confirm the integrity. So that, it is confirmed that HEPA filters and the blower under pressure loading were sufficient to maintain the integrity. The content described in this report will contribute to safety assessment of the ventilation system in the event of explosive burning in the reprocessing plant. (author)

  10. 688,112 statistical results: Content mining psychology articles for statistical test results

    OpenAIRE

    Hartgerink, C.H.J.

    2016-01-01

    In this data deposit, I describe a dataset that is the result of content mining 167,318 published articles for statistical test results reported according to the standards prescribed by the American Psychological Association (APA). Articles published by the APA, Springer, Sage, and Taylor & Francis were included (mining from Wiley and Elsevier was actively blocked). As a result of this content mining, 688,112 results from 50,845 articles were extracted. In order to provide a comprehensive set...

  11. A commercially available immunoglobulin E-based test for food allergy gives inconsistent results in healthy ponies.

    Science.gov (United States)

    Dupont, S; De Spiegeleer, A; Liu, D J X; Lefère, L; van Doorn, D A; Hesta, M

    2016-01-01

    Commercial immunoglobulin E (IgE)-based tests are available for diagnosis of food allergies and are commonly used in equine practice. However, these tests have been proven unreliable as a screening method in man and other species, but not critically evaluated in equids. Therefore, a commercially available IgE-based test for horses was evaluated. To evaluate the consistency of the results obtained with a commercially available IgE-based test for food allergy diagnosis in ponies (Phase I) and to subject ponies to a provocation trial with the presumed allergens (Phase II). Allergen screening followed by experimental food provocation trials in healthy ponies. Blood samples of 17 healthy Shetland ponies were taken at 2 different time points, sent blinded to a commercial laboratory for screening of common food allergens and the results were evaluated for consistency (Phase I). Ponies that were positive for food allergens were consecutively challenged orally with each allergen separately for 14 days (Phase II). A washout period of one week was applied in ponies with multiple positive results. Clinical parameters and serum amyloid A were monitored during the provocation trial. Only 7/17 ponies were negative on the IgE-based test at the 2 time points, 3 had positive results twice but only one tested positive twice for the same food allergen. No abnormalities were noted during the provocation trials. This study demonstrated that this IgE-based test is not a reliable screening tool for food allergy in healthy equids. © 2015 EVJ Ltd.

  12. Test results with the Transrapid 06. System data from preliminary trials

    Energy Technology Data Exchange (ETDEWEB)

    Heinrich, K; Mnich, P

    1987-10-01

    Following the takeover of the Transrapid maglev facility by MVP, in spite of remaining preparatory work and conversion of the support and guidance system on the basis of a new electronic generation, interesting system data could be obtained experimentally before the planned continuous trials phase. Although the full test track length is not yet available - it is at present only 20.5 km - more than 25,000 km have already been covered in almost 1,200 test runs. Some 200 of these were for the purpose of demonstrating the Transrapid technology to visting German and foreign experts. The system data obtained from the preliminary trails were positive. Any weak points noted were mainly site-specific and not maglev-specific, but in spite of generally satisfactory results there are still many individual aspects calling for improvement and optimation before the technology can be declared ready for service. Proceeding from the positive trend of the system data obtained at up to 355 km/h, it can be said that proof of serviceability of the Transrapid transport system at speeds of up to 400 km/h can be provided in the next two years. (orig.).

  13. Test results of sodium-water reaction testing in near prototypical LMR steam generator

    International Nuclear Information System (INIS)

    Boardman, C.E.; Hui, M.; Neely, H.H.

    1990-01-01

    An extensive test program has been performed in the United States to investigate the effects of large sodium-water reaction events in LMFBR steam generators. Tests were conducted in the Large Leak Test Rig (LLTR) located at the Energy Technology Engineering Center (ETEC). The program was divided into two phases, Series I and Series II, for the purpose of satisfying near-term and long-term needs. Series II was further subdivided into large and intermediate leak tests. This paper will emphasize the Series II intermediate leak tests and resulting conclusions for steam generator design and operation. 11 figs, 2 tabs

  14. ALICE TRD results from prototype tests

    CERN Document Server

    Andronic, A; Blume, C; Braun-Munzinger, P; Bucher, D; Catanescu, G; Ciobanu, M; Daues, H W; Devismes, A; Finck, C; Herrmann, N; Lister, T A; Mahmoud, Tariq; Peitzmann, Thomas; Petrovici, M; Reygers, K; Santo, R; Schicker, R; Sedykha, S; Simon, R S; Stachel, J; Stelzer, H; Wessels, J P; Winkelmann, O; Windelband, B; Xu, C

    2002-01-01

    We present results from tests of a prototype of the TRD for the ALICE experiment at LHC. We investigate the performance-of different radiator types, composed of foils, fibres and foams. The pion rejection performance for different methods of analysis over a momentum range from 0.7 to 2 GeV/c is presented. (8 refs).

  15. Reproducibility of the results in nondestructive testing

    International Nuclear Information System (INIS)

    Launay, J.P.; Chalaye, H.; Thomas, A.

    1980-10-01

    Pressure vessels must comply with very severe safety criteria. In order to ensure that the required quality is attained, non destructive tests are used and these have to be highly reliable: magnetoscopy and liquid penetration for surface examinations, radiography and ultrasonics for voluminal examinations. In the case of ultrasonic examinations, a study of parameters has been made and a statistical analysis of the results has made it possible to calculate the dispersion due to the testing equipment [fr

  16. Results from early programmatic implementation of Xpert MTB/RIF testing in nine countries.

    Science.gov (United States)

    Creswell, Jacob; Codlin, Andrew J; Andre, Emmanuel; Micek, Mark A; Bedru, Ahmed; Carter, E Jane; Yadav, Rajendra-Prasad; Mosneaga, Andrei; Rai, Bishwa; Banu, Sayera; Brouwer, Miranda; Blok, Lucie; Sahu, Suvanand; Ditiu, Lucica

    2014-01-02

    The Xpert MTB/RIF assay has garnered significant interest as a sensitive and rapid diagnostic tool to improve detection of sensitive and drug resistant tuberculosis. However, most existing literature has described the performance of MTB/RIF testing only in study conditions; little information is available on its use in routine case finding. TB REACH is a multi-country initiative focusing on innovative ways to improve case notification. We selected a convenience sample of nine TB REACH projects for inclusion to cover a range of implementers, regions and approaches. Standard quarterly reports and machine data from the first 12 months of MTB/RIF implementation in each project were utilized to analyze patient yields, rifampicin resistance, and failed tests. Data was collected from September 2011 to March 2013. A questionnaire was implemented and semi-structured interviews with project staff were conducted to gather information on user experiences and challenges. All projects used MTB/RIF testing for people with suspected TB, as opposed to testing for drug resistance among already diagnosed patients. The projects placed 65 machines (196 modules) in a variety of facilities and employed numerous case-finding strategies and testing algorithms. The projects consumed 47,973 MTB/RIF tests. Of valid tests, 7,195 (16.8%) were positive for MTB. A total of 982 rifampicin resistant results were found (13.6% of positive tests). Of all tests conducted, 10.6% failed. The need for continuous power supply was noted by all projects and most used locally procured solutions. There was considerable heterogeneity in how results were reported and recorded, reflecting the lack of standardized guidance in some countries. The findings of this study begin to fill the gaps among guidelines, research findings, and real-world implementation of MTB/RIF testing. Testing with Xpert MTB/RIF detected a large number of people with TB that routine services failed to detect. The study demonstrates the

  17. General Electric Company proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The general requirements and methods for instrumenting, testing, and evaluating solar HVAC systems forming a part of ERDA's ''Commercial Demonstration Program'' commensurate with ERDA 23A and the Proposed Management Plan 75SDS4270 are defined. Design requirements are specified for the performance of components and subsystems comprising the instrumentation and data gathering system, as well as the support functions required to perform the diagnostic measurements, collection and processing of data, and documentation of reports on solar HVAC system performance, including economic and societal evaluations.

  18. Monte Carlo based demonstration of sufficiently dimensioned shielding for a Co-60 testing facility

    International Nuclear Information System (INIS)

    Wind, Michael; Beck, Peter; Latocha, Marcin

    2015-01-01

    The electrical properties of electronic equipment can be changed in an ionized radiation field. The knowledge of these changes is necessary for applications in space, in air traffic and nuclear medicine. Experimental tests will be performed in Co-60 radiation fields in the irradiation facility (TEC facility) of the Seibersdorf Labor GmbH that is in construction. The contribution deals with a simulation that is aimed to calculate the local dose rate within and outside the building for demonstration of sufficient dimensioning of the shielding in compliance with the legal dose rate limits.

  19. Results of screening NCI/NTP nongenotoxic carcinogens and genotoxic noncarcinogens with the ke test

    International Nuclear Information System (INIS)

    Mendelsohn, M.L.; Bakale, G.; McCreary, R.D.

    1989-01-01

    The interdependence of the electrophilic and carcinogenic properties of chemicals that was demonstrated two decades ago rekindled interest in the somatic mutation theory of carcinogenesis. Interest in this theory grew with the development of a reverse-mutation bacterial assay in the laboratory of B.N. Ames that permitted the mutagenic properties of the chemicals to be determined quickly and yielded results which indicated that ''carcinogens are mutagens.'' Subsequent validation studies of this bioassay, the Salmonella typhimurium/microsome or ''Ames test,'' by Ames' group and others provided additional support for the correlation between mutagenicity and carcinogenicity which led to the worldwide deployment of the Ames test in thousands of laboratories and to the development of more than 100 other short-term tests that continue to be used to identify potential carcinogens via various end-points of genotoxicity. This document discusses electrophilicity, mutagenicity, and carcinogenicity relationships as well as carcinogen-screening of chemicals. 28 refs., 4 tabs

  20. Interpreting results of cluster surveys in emergency settings: is the LQAS test the best option?

    Science.gov (United States)

    Bilukha, Oleg O; Blanton, Curtis

    2008-12-09

    Cluster surveys are commonly used in humanitarian emergencies to measure health and nutrition indicators. Deitchler et al. have proposed to use Lot Quality Assurance Sampling (LQAS) hypothesis testing in cluster surveys to classify the prevalence of global acute malnutrition as exceeding or not exceeding the pre-established thresholds. Field practitioners and decision-makers must clearly understand the meaning and implications of using this test in interpreting survey results to make programmatic decisions. We demonstrate that the LQAS test--as proposed by Deitchler et al.--is prone to producing false-positive results and thus is likely to suggest interventions in situations where interventions may not be needed. As an alternative, to provide more useful information for decision-making, we suggest reporting the probability of an indicator's exceeding the threshold as a direct measure of "risk". Such probability can be easily determined in field settings by using a simple spreadsheet calculator. The "risk" of exceeding the threshold can then be considered in the context of other aggravating and protective factors to make informed programmatic decisions.

  1. Experimental-demonstrative system for energy conversion using hydrogen fuel cell - preliminary results

    International Nuclear Information System (INIS)

    Stoenescu, D.; Stefanescu, I.; Patularu, I.; Culcer, M.; Lazar, R.E.; Carcadea, E.; Mirica, D. . E-mail address of corresponding author: daniela@icsi.ro; Stoenescu, D.)

    2005-01-01

    It is well known that hydrogen is the most promising solution of future energy, both for long and medium term strategies. Hydrogen can be produced using many primary sources (natural gas, methane, biomass, etc.), it can be burned or chemically react having a high yield of energy conversion, being a non-polluted fuel. This paper presents the preliminary results obtained by ICSI Rm. Valcea in an experimental-demonstrative conversion energy system made by a sequence of hydrogen purification units and a CO removing reactors until a CO level lower than 10ppm, that finally feeds a hydrogen fuel stack. (author)

  2. FFTF startup: status and results

    International Nuclear Information System (INIS)

    Noordhoff, B.H.; Moore, C.E.

    1980-03-01

    Startup testing on the Fast Flux Test Facility (FFTF) during the past three years has progressed beyond initial criticality toward the principal goal of power demonstration in 1980. An overview is presented of technical results to date and project plans to achieve power demonstration and complete the startup test program

  3. Evaluation of LLTR series II test A-7 results

    International Nuclear Information System (INIS)

    Knittle, D.E.; Amos, J.C.; Yang, T.M.

    1981-09-01

    This report evaluates the test A-7 data and assesses the capability of the analytical methodology (as a result of Series I program) to predict the thermal/hydraulic phenomena associated with a large SWR event occurring after the sodium system pressure has increased to near the rupture disc burst pressure due to a smaller size leak event. Evaluation of intertest examination data to determine the extent of test article damage resulting from test A-7 is also included

  4. Guidelines to Interpret Results of Mechanical Blade Test

    International Nuclear Information System (INIS)

    Arias Vega, F.; Sanz Martin, J. C.

    1999-01-01

    This report shows the interpretation of full scale rotor blade test results and describes the engineering testing models and coefficients for any feasible rotor blade design, in order to accept and to certify any final manufactured blade as an allowable product, fit for use and working with a completely security during all the wind turbines lifetime. This work was carried out at the Wind Energy Division of the CIEMAT.DER and it is based on the authors technical experience in this field, after many years working on testing blades. Also, this paper contains results of the European wind turbine Standards II relevant to the European Project: JOULE III R.D. where the Wind Energy Division took part as participant too. (Author)

  5. Guidelines to Interpret Results of Mechanical Blade Test

    Energy Technology Data Exchange (ETDEWEB)

    Arias Vega, F.; Sanz Martin, J. C. [Ciemat, Madrid (Spain)

    2000-07-01

    This report shows the interpretation of full scale rotor blade test results and describes the engineering testing models and coefficients for any feasible rotor blade design, in order to accept and to certify any final manufactured blades as an allowable product, fit for use and working with a completely security during all the windturbine's lifetime. This work was carried out at the Wind Energy Division of the CIEMAT.DER and it is based on the author's technical experience in this field, after many years working on testing blades. Also, this paper contains results of the European wind turbine Standards II relevant to the European Project: JOULE III R.D. where the Wind Energy Division took part as participant too. (Author)

  6. Supersonic Panel Flutter Test Results for Flat Fiber-Glass Sandwich Panels with Foamed Cores

    Science.gov (United States)

    Tuovila, W. J.; Presnell, John G., Jr.

    1961-01-01

    Flutter tests have been made on flat panels having a 1/4 inch-thick plastic-foam core covered with thin fiber-glass laminates. The testing was done in the Langley Unitary Plan wind tunnel at Mach numbers from 1.76 t o 2.87. The flutter boundary for these panels was found to be near the flutter boundary of thin metal panels when compared on the basis of an equivalent panel stiffness. The results also demonstrated that the depth of the cavity behind the panel has a pronounced influence on flutter. Changing the cavity depth from 1 1/2 inches to 1/2 inch reduced the dynamic pressure at start of flutter by 40 percent. No flutter was obtained when the spacers on the back of the panel were against the bottom of the cavity.

  7. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  8. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  9. Automotive RF immunity test set-up analysis : why test results can't compare

    NARCIS (Netherlands)

    Coenen, Mart; Pues, H.; Bousquet, T.

    2011-01-01

    Though the automotive RF emission and RF immunity requirements are highly justifiable, the application of those requirements in an non-intended manner leads to false conclusions and unnecessary redesigns for the electronics involved. When the test results become too dependent upon the test set-up

  10. Cyclonic valve test: preliminary results

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Andre Sampaio; Moraes, Carlos Alberto C.; Marins, Luiz Philipe M.; Soares, Fabricio; Oliveira, Dennis; Lima, Fabio Soares de; Airao, Vinicius [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Ton, Tijmen [Twister BV, Rijswijk (Netherlands)

    2012-07-01

    For many years, the petroleum industry has been developing a valve that input less shear to the flow for a given required pressure drop and this can be done using the cyclonic concept. This paper presents a comparison between the performances of a cyclonic valve (low shear) and a conventional globe valve. The aim of this work is to show the advantages of using a cyclonic low shear valve instead of the commonly used in the primary separation process by PETROBRAS. Tests were performed at PETROBRAS Experimental Center (NUEX) in Aracaju/SE varying some parameters: water cut; pressure loss (from 4 kgf/cm2 to 10 kgf/cm2); flow rates (30 m3/h and 45 m3/h). Results indicates a better performance of the cyclonic valve, if compared with a conventional one, and also that the difference of the performance, is a function of several parameters (emulsion stability, water content free, and oil properties). The cyclonic valve tested can be applied as a choke valve, as a valve between separation stages (for pressure drop), or for controlling the level of vessels. We must emphasize the importance to avoid the high shear imposed by conventional valves, because once the emulsion is created, it becomes more difficult to break it. New tests are being planned to occur in 2012, but PETROBRAS is also analyzing real cases where the applications could increase the primary process efficiency. In the same way, the future installations are also being designed considering the cyclonic valve usage. (author)

  11. Selected Flight Test Results for Online Learning Neural Network-Based Flight Control System

    Science.gov (United States)

    Williams-Hayes, Peggy S.

    2004-01-01

    The NASA F-15 Intelligent Flight Control System project team developed a series of flight control concepts designed to demonstrate neural network-based adaptive controller benefits, with the objective to develop and flight-test control systems using neural network technology to optimize aircraft performance under nominal conditions and stabilize the aircraft under failure conditions. This report presents flight-test results for an adaptive controller using stability and control derivative values from an online learning neural network. A dynamic cell structure neural network is used in conjunction with a real-time parameter identification algorithm to estimate aerodynamic stability and control derivative increments to baseline aerodynamic derivatives in flight. This open-loop flight test set was performed in preparation for a future phase in which the learning neural network and parameter identification algorithm output would provide the flight controller with aerodynamic stability and control derivative updates in near real time. Two flight maneuvers are analyzed - pitch frequency sweep and automated flight-test maneuver designed to optimally excite the parameter identification algorithm in all axes. Frequency responses generated from flight data are compared to those obtained from nonlinear simulation runs. Flight data examination shows that addition of flight-identified aerodynamic derivative increments into the simulation improved aircraft pitch handling qualities.

  12. Design alternatives report for the cesium removal demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued.

  13. Design alternatives report for the cesium removal demonstration

    International Nuclear Information System (INIS)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued

  14. Small-Scale Spray Releases: Additional Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Schonewill, Philip P.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, G. N.; Mahoney, Lenna A.; Tran, Diana N.; Burns, Carolyn A.; Kurath, Dean E.

    2013-08-01

    One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are largely absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale. The small-scale testing and resultant data are described in Mahoney et al. (2012b) and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used to mimic the

  15. Assessment of the quality of test results from selected civil engineering material testing laboratories in Tanzania

    CSIR Research Space (South Africa)

    Mbawala, SJ

    2017-12-01

    Full Text Available Civil and geotechnical engineering material testing laboratories are expected to produce accurate and reliable test results. However, the ability of laboratories to produce accurate and reliable test results depends on many factors, among others...

  16. Relationship between substances in seminal plasma and Acrobeads Test results.

    Science.gov (United States)

    Komori, Kazuhiko; Tsujimura, Akira; Okamoto, Yoshio; Matsuoka, Yasuhiro; Takao, Tetsuya; Miyagawa, Yasushi; Takada, Shingo; Nonomura, Norio; Okuyama, Akihiko

    2009-01-01

    To asses the effects of seminal plasma on sperm function. Retrospective case-control study. University hospital. One hundred fourteen infertile men. Acrobeads Test scores (0-4) and measurement of interleukin (IL)-6, soluble IL-6 receptor, epidermal growth factor, insulin-like growth factor-I (IGF-I), transforming growth factor-beta I, superoxide dismutase, calcitonin, and macrophage migration inhibitory factor (MIF) levels in seminal plasma. Kruskal-Wallis test to compare the concentrations of substances as a nonparametric test for differences among Acrobeads Test scores and a multivariable logistic regression model to find independent risk factors associated with abnormal Acrobeads Test results. The Acrobeads Test score was 0 for 7 samples, 1 for 20 samples, 2 for 18 samples, 3 for 28 samples, and 4 for 41 samples. Age, abstinence period, and semen parameters, except for sperm motility and percentage of sperm with abnormal morphology, had no effect on the Acrobeads Test results. Concentrations of IGF-I and MIF were significantly higher in patients with abnormal Acrobeads Test results. Multivariate analysis indicated that MIF and IGF-I were significantly associated with abnormal Acrobeads Test results (scores 0 to 1). Although further studies are needed, IGF-I and MIF in seminal plasma may have negative effects on sperm function.

  17. Replacement of the in vivo neutralisation test for efficacy demonstration of tetanus vaccines ad us. vet.

    Science.gov (United States)

    Rosskopf, Ute; Noeske, Kerstin; Werner, Esther

    2005-01-01

    The bacterium Clostridium (C.) tetani is an ubiquitous pathogen. This anaerobic, gram-positive bacterium can form spores and can be found in the whole environment. It enters the body via injuries of the skin and wounds where it releases the neurotoxin "tetanospasmin" (= tetanus toxin). The animals most susceptible to tetanus infection are horses and sheep. Only active immunisation by tetanus vaccine provides effective protection against tetanus intoxication. The marketing authorisation requirements stipulate that efficacy of tetanus vaccines ad us. vet. must be demonstrated in all target animal species via determination of neutralising tetanus serum antitoxin concentrations. The standard method used for this purpose is still the toxin neutralisation test (TNT), as it quantifies the tetanus toxin-neutralising effect of tetanus serum antibodies in vivo. In this test, tetanus toxin is added to dilutions of serum from vaccinated horse and sheep. The serum dilutions are then administered to mice or guinea pigs, which are observed for toxic symptoms. Against the background of animal protection, the goal of one project of the Paul-Ehrlich-Institut (Bundesministerium fuer Bildung und Forschung (Federal Ministry for Education and Research), 0312636) was to establish an alternative to the toxin neutralisation test, enabling the testing of efficacy of tetanus vaccines with serological in vitro methods. For this purpose, a so-called double antigen ELISA (DAE) was established which enables the testing of sera of different species in one assay. In addition, the sera were tested in an indirect ELISA for horses and sheep separately. Altogether, ten groups of horses and eight groups of sheep were immunised with ten animals per group each. The tetanus vaccines comprised almost all products authorised for the German market at the start of the project. 564 horse sera and 257 sheep sera were tested using the two ELISA methods. Some sera were also tested in vivo. The kinetics of

  18. Interim results from UO2 fuel oxidation tests in air

    International Nuclear Information System (INIS)

    Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j.

    1987-08-01

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO 2 , fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO 2 pellets in the temperature range of 135 to 250 0 C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10 5 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10 5 R/h gamma field. 33 refs., 51 figs., 6 tabs

  19. Results of testing the frontal AK-3 extraction unit

    Energy Technology Data Exchange (ETDEWEB)

    Yakovlev, N I; Dolinskii, A M; Kolesnikov, M A

    1978-10-01

    From August to November 1970, on site testing of a protype frontal AK excavating rig developed by Giprouglemesh for use on gentle sloping seams was conducted in the Novaya mine of the Kuzbass Ugol Consolidated. The AK-3 consists of a cutting assembly in the form of a ring frontal slicer with two drives, hydraulic operated sectionalized support timbers of the enclosed lift type, conjugated timbering with ventilation and conveyor shafts, personnel elevator and hydraulic and electrical ancillary equipment. The production capacity of the rig in longwalls is 2.2 times greater on the average than by using drillhole blasting methods. Tests demonstrated that the main advantage of the Ak-3 was the single operation, continuous flow mode of coal extraction and remote frontal movement of timber sections, which ensured high capacity loading at the face and the capability of automating all procedures and eliminating all workers from the extraction face.

  20. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  1. Development, testing, and demonstration of geotechnical and cement-based encapsulant materials for the stabilization of radioactive and hazardous waste disposal structures

    International Nuclear Information System (INIS)

    Phillips, S.J.; Cammann, J.W.; Benny, H.L.; Serne, R.J.; Martin, P.F.; Ames, L.L.

    1991-09-01

    A zeolite fluidized-bed treatment system is being developed and tested for the treatment of radioactive and hazardous waste-contaminated subsurface disposal structures. Formulations of cement, fly ash, and slag slurries and sequestering agents also are being tested and evaluated. Leach resistance of radionuclides, heavy metals, and hazardous inorganic compounds in the solidified cement-based encapsulant has been determined. These results simulate the resistance to water leaching of the solidified product after it has been injected an open and interstitial void volume in and proximal to liquid waste disposal structures. Micro- and macro-encapsulation of contaminants within and geologic media surrounding subsurface disposal structures is being demonstrated as an alternative technology for waste site remediation. 5 refs., 1 fig., 1 tab

  2. Test results of the SMES model coil. Pulse performance

    International Nuclear Information System (INIS)

    Hamajima, Takataro; Shimada, Mamoru; Ono, Michitaka

    1998-01-01

    A model coil for superconducting magnetic energy storage (SMES model coil) has been developed to establish the component technologies needed for a small-scale 100 kWh SMES device. The SMES model coil was fabricated, and then performance tests were carried out in 1996. The coil was successfully charged up to around 30 kA and down to zero at the same ramp rate of magnetic field experienced in a 100 kWh SMES device. AC loss in the coil was measured by an enthalpy method as parameters of ramp rate and flat top current. The results were evaluated by an analysis and compared with short-sample test results. The measured hysteresis loss is in good agreement with that estimated from the short-sample results. It was found that the coupling loss of the coil consists of two major coupling time constants. One is a short time constant of about 200 ms, which is in agreement with the test results of a short real conductor. The other is a long time constant of about 30 s, which could not be expected from the short sample test results. (author)

  3. Initial Results from On-Orbit Testing of the Fram Memory Test Experiment on the Fastsat Micro-Satellite

    Science.gov (United States)

    MacLeond, Todd C.; Sims, W. Herb; Varnavas,Kosta A.; Ho, Fat D.

    2011-01-01

    The Memory Test Experiment is a space test of a ferroelectric memory device on a low Earth orbit satellite that launched in November 2010. The memory device being tested is a commercial Ramtron Inc. 512K memory device. The circuit was designed into the satellite avionics and is not used to control the satellite. The test consists of writing and reading data with the ferroelectric based memory device. Any errors are detected and are stored on board the satellite. The data is sent to the ground through telemetry once a day. Analysis of the data can determine the kind of error that was found and will lead to a better understanding of the effects of space radiation on memory systems. The test is one of the first flight demonstrations of ferroelectric memory in a near polar orbit which allows testing in a varied radiation environment. The initial data from the test is presented. This paper details the goals and purpose of this experiment as well as the development process. The process for analyzing the data to gain the maximum understanding of the performance of the ferroelectric memory device is detailed.

  4. Results of performance tests on polymer zirconium compound (PZC)

    International Nuclear Information System (INIS)

    Sombrito, Elvira Z.; Bulos, Adelina DM.

    2006-01-01

    Three batches of polyzirconium compound (PZC) consisting of nine samples were tested for its application as column material for adsorbing reactor-produced molybdenum-99 ( 99 Mo). Using low specific activity molybdenum solution (∼500 μCi/267 mg Mo), the adsorption capacity, elution yield, elution volume and molybdenum breakthrough were measured. The average adsorption capacity of the nine samples is 239 ± 17 mg Mo/g PZC. The elution yield values obtained are lower than previously obtained and averaged at 47% with 30% variability. Molybdenum breakthrough also exceeded the limits for 99m Tc eluates. Considering the better performance of 2002 PZC samples, the samples may have undergone some changes during storage (tests were performed in December 2003) and/or the adsorption process did not conform to the recommended procedure. If this were the case, it demonstrated the importance of strictly following the recommended protocol. Relative values showed that the last two batches (PZC 030718 and PC 030726) performed better than the first batch in terms of elution yield and elution profile. These two batches exhibited amorphous structure as seen by x-ray diffraction analysis of the PZC test samples. (author)

  5. Orally administered whole egg demonstrates antidepressant-like effects in the forced swimming test on rats.

    Science.gov (United States)

    Nagasawa, Mao; Otsuka, Tsuyoshi; Ogino, Yumi; Yoshida, Junki; Tomonaga, Shozo; Yasuo, Shinobu; Furuse, Mitsuhiro

    2014-08-01

    Several studies have reported that vegetarian diets are associated with a higher prevalence of major depression. Therefore, we hypothesised that the consumption of animal products, especially eggs, may have positive effects on mental health, especially on major depression, because a previous study reported that egg consumption produces numerous beneficial effects in humans. The purpose of the present study was to evaluate the effects of chronic whole-egg treatment on depression-like behaviours in Wistar rats, a control strain, and Wistar Kyoto rats, an animal model of depression. In both the rats, either whole-egg solution (5 ml/kg) or distilled water (5 ml/kg) was orally administrated for 35 days. During these periods, the open-field test (OFT) was conducted on the 21st day, and a forced swimming test (FST) was enforced on the 27th and 28th days. On the 36th day, the plasma and brain were collected. Chronic whole-egg treatment did not affect line crossing in the OFT, whereas it reduced the total duration of immobility in the FST on both strains. Furthermore, interestingly, the results indicated the possibility that whole-egg treatment elevated the incorporation of tryptophan into the brain, and the tryptophan concentration in the prefrontal cortex was actually increased by the treatment. This study demonstrated that whole-egg treatment exerts an antidepressant-like effect in the FST. It is suggested that whole egg may be an excellent food for preventing and alleviating the conditions of major depression.

  6. Pilot plant SERSE: Description and results of the experimental tests under treatment of simulated chemical liquid waste

    International Nuclear Information System (INIS)

    Calle, C.; Gili, M.; Luce, A.; Marrocchelli, A.; Pietrelli, L.; Troiani, F.

    1989-11-01

    The chemical processes for the selective separation of the actinides and long lived fission products from aged liquid wastes is described. The SERSE pilot plant is a cold facility which has been designed, by ENEA, for the engineering scale demonstration of the chemical separation processes. The experimental tests carried out in the plant are described and the results confirm the laboratory data. (author)

  7. Thermal results of the Japanese LCT coil's domestic test

    International Nuclear Information System (INIS)

    Tada, Eisuke; Hiyama, Tadao; Kato, Takashi; Takahashi, Osamu; Shimamoto, Susumu

    1984-01-01

    This paper describes thermal results obtained in the domestic test of the Japanese LCT coil which was constructed at the Japan Atomic Energy Research Institute (JAERI) in order to develop large superconducting coils for fusion in international collaboration proposed by the IEA. The domestic test was carried out from May 13 to June 17 in 1982 by using the test facility named as SETF (Superconducting Engineering Test Facility) which was composed of a 350-l/h helium cryogenic system, a vacuum system, a 30 KA-DC power supply and protection system, and a PDP-11/70 computer system. The cool-down characteristics, heat load, fast discharge characteristics, stability, and warm-up characteristics of the LCT coil were successfully measured in the test. The details of thermal test results acquired in the cool-down, heat load measurement, fast discharge, and warm-up, and the comparison between measurements and calculations are described in this paper. (author)

  8. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sresty, G.C.

    1994-07-07

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. The EM heating process for soil decontamination is based on volumetric heating technologies developed during the `70s for the recovery of fuels from shale and tar sands by IIT Research Institute (IITRI) under a co-operative program with the US Department of Energy (DOE). Additional modifications of the technology developed during the mid `80s are currently used for the production of heavy oil and waste treatment. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 to 95 C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern.

  9. Recent test results on the ATLAS SCT detector

    International Nuclear Information System (INIS)

    Pernegger, H.

    2003-01-01

    The ATLAS Semiconductor Tracker (SCT) will be a central part of the tracking system of the ATLAS experiment. The SCT, which is currently under construction, will consist of four concentric barrels of silicon detectors as well as two silicon endcap detectors formed by nine disks each. After an overview of the SCT and the detector module layout, the paper will summarize recent test results obtained from silicon detector modules, which have been extensively tested before starting their large series production. The tests presented here cover electrical performance of individual modules, their performance after irradiation, as well as system tests in a multi-module setup

  10. AOF: standalone test results of GALACSI

    Science.gov (United States)

    La Penna, P.; Aller Carpentier, E.; Argomedo, J.; Arsenault, R.; Conzelmann, R. D.; Delabre, B.; Donaldson, R.; Gago, F.; Gutierrez-Cheetam, P.; Hubin, N.; Jolley, P.; Kiekebusch, M.; Kirchbauer, J. P.; Klein, B.; Kolb, J.; Kuntschner, H.; Le Louarn, M.; Lizon, J.-L.; Madec, P.-Y.; Manescau, A.; Mehrgan, L.; Oberti, S.; Quentin, J.; Sedghi, B.; Ströbele, S.; Suárez Valles, M.; Soenke, C.; Tordo, S.; Vernet, J.

    2016-07-01

    GALACSI is the Adaptive Optics (AO) module that will serve the MUSE Integral Field Spectrograph. In Wide Field Mode it will enhance the collected energy in a 0.2"×0.2" pixel by a factor 2 at 750 nm over a Field of View (FoV) of 1'×1' using the Ground Layer AO (GLAO) technique. In Narrow Field Mode, it will provide a Strehl Ratio of 5% (goal 10%) at 650 nm, but in a smaller FoV (7.5"×7.5" FoV), using Laser Tomography AO (LTAO). Before being ready for shipping to Paranal, the system has gone through an extensive testing phase in Europe, first in standalone mode and then in closed loop with the DSM in Europe. After outlining the technical features of the system, we describe here the first part of that testing phase and the integration with the AOF ASSIST (Adaptive Secondary Setup and Instrument Stimulator) testbench, including a specific adapter for the IRLOS truth sensor. The procedures for the standalone verification of the main system performances are outlined, and the results of the internal functional tests of GALACSI after full integration and alignment on ASSIST are presented.

  11. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  12. Development and performance test results of 50 kA vapor-cooled current lead for ITER

    International Nuclear Information System (INIS)

    Sugimoto, Makoto; Isono, Takaaki; Hamada, Kazuya

    1998-01-01

    JAERI has developed 50 kA current leads for the International Thermonuclear Experimental Reactor (ITER). The Center Solenoid (CS) Model Coil program is under way by means of international collaboration in ITER-EDA. The CS model coil is being developed for ITER CS coil and is for demonstration for ITER construction. The performance test of the CS model coil will be carried out at the JAERI ITER common test facility (CTF). The current lead consists of the vertical lead and the connection lead. The vertical lead is a vapor-cooled type and has a cable-in-conduit geometry. The vertical lead was designed with a heat leak of 1.2 W/kA at a helium flow rate of 0.06 g/(s·kA). The measured heat leak satisfied the designed value. The connection lead was made from copper pipe soldered with NbTi superconducting wires. The pipe was stabilized by the superconducting wires and a cooling channel. The current lead was operated up to 60 kA. The design and the performance test results of 50 kA current leads are reported. The results meet the specifications for the CS model coil test and for the ITER real machine. (author)

  13. New test methods for BIPV. Results from IP performance

    International Nuclear Information System (INIS)

    Jol, J.C.; Van Kampen, B.J.M.; De Boer, B.J.; Reil, F.; Geyer, D.

    2009-11-01

    Within the Performance project new test procedures for PV building products and the building performance as a whole when PV is applied in buildings have been drafted. It has resulted in a first draft of new test procedures for PV building products and proposals for tests for novel BIPV technology like thin film. The test proposed are a module breakage test for BIPV products, a fire safety test for BIPV products and a dynamic load test for BIPV products. Furthermore first proposals of how flexible PV modules could be tested in an appropriate way to ensure long time quality and safety of these new products are presented.

  14. Demonstration, testing and evaluation of nonintrusive characterization technologies at operable Unit 2 of Rocky Flats Plant. Final report

    International Nuclear Information System (INIS)

    1994-09-01

    A three-dimensional (3-D), high-resolution (HR) seismic reflection evaluation was conducted at the Rocky Flats Plant (RFP), near Golden, Colorado, to demonstrate the applicability of nonintrusive characterization techniques to detect buried objects, contamination, and geological/hydrological features at RFP. The evaluation was conducted as part of the U.S. Department of Energy's (DOE) request for demonstration, testing and evaluation (DT ampersand E) of nonintrusive techniques, under DOE Program Research and Development Announcement (PRDA) No. DE-RA05-09OR22000

  15. Demonstration, testing and evaluation of nonintrusive characterization technologies at operable Unit 2 of Rocky Flats Plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    A three-dimensional (3-D), high-resolution (HR) seismic reflection evaluation was conducted at the Rocky Flats Plant (RFP), near Golden, Colorado, to demonstrate the applicability of nonintrusive characterization techniques to detect buried objects, contamination, and geological/hydrological features at RFP. The evaluation was conducted as part of the U.S. Department of Energy`s (DOE) request for demonstration, testing and evaluation (DT&E) of nonintrusive techniques, under DOE Program Research and Development Announcement (PRDA) No. DE-RA05-09OR22000.

  16. Physical separations soil washing system cold test results

    Energy Technology Data Exchange (ETDEWEB)

    McGuire, J.P.

    1993-07-28

    This test summary describes the objectives, methodology, and results of a physical separations soil-washing system setup and shakedown test using uncontaminated soil. The test is being conducted in preparation for a treatability test to be conducted in the North Pond of the 300-FF-1 Operable Unit. It will be used to assess the feasibility of using a physical separations process to reduce the volume of contaminated soils in the 300-FF-1 Operable Unit. The test is described in DOE-RL (1993). The setup test was conducted at an uncontrolled area located approximately 3.2 km northwest of the 300-FF-1 Operable Unit. The material processed was free of contamination. The physical separation equipment to be used in the test was transferred to the US Department of Energy (DOE) by the US Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory. On May 13, 1993, soil-washing equipment was moved to the cold test location. Design assistance and recommendation for operation was provided by the EPA.

  17. Cement/bentonite interaction. Results from 16 month laboratory tests

    Energy Technology Data Exchange (ETDEWEB)

    Karnland, O. [Clay Technology AB, Lund (Sweden)

    1997-12-01

    The work concerns possible bentonite clay mineral alteration in constructions with bentonite in close contact with cement, and the effect of such changes on bentonite buffer properties. The investigation comprises a 16 months laboratory test series with hydrothermal cell tests, percolation tests and diffusion tests. MX-80 Wyoming bentonite was used in all tests. Two types of artificial cement pore water solutions were used in the percolation and diffusion tests. The swelling pressure and the hydraulic conductivity were measured continuously in the percolation tests. After termination, the clay was analyzed with respect to changes in element distribution, mineralogy and shear strength. The water solutions were analyzed with respect to pH, cations and major anions. The results concerning chemical and mineralogical changes are in summary: Ion exchange in the montmorillonite until equilibrium with cement pore-water ions was reached; Increase in cation exchange capacity; Dissolution of original cristobalite; Increase in quartz content; Minor increase in illite content; Minor formation of chlorite; Formation of CSH(I); Wash away of CSH-gel into surrounding water. A large decrease in swelling pressure and a moderate increase in hydraulic conductivity were recorded in the samples percolated by SULFACEM pore-water solution. The mineralogical alterations only concerned a minor part of the total bentonite mass and the changes in physical properties were therefore most likely due to the replacement of the original charge balancing cation by cement pore-water cations. Comparisons between the current test result and results from 4 month tests indicate that the rates of illite and chlorite formation were reduced during the tests. The presence of zeolites in the clay could not be ensured. However, the discovery of CSH material is important since CSH is expected to precede the formation of zeolites 5 refs, 48 figs, 11 tabs

  18. RSG Deployment Case Testing Results

    Energy Technology Data Exchange (ETDEWEB)

    Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

    2005-09-01

    The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

  19. Deep n-well MAPS in a 130 nm CMOS technology: Beam test results

    International Nuclear Information System (INIS)

    Neri, N.; Avanzini, C.; Batignani, G.; Bettarini, S.; Bosi, F.; Ceccanti, M.; Cenci, R.; Cervelli, A.; Crescioli, F.; Dell'Orso, M.; Forti, F.; Giannetti, P.; Giorgi, M.A.; Gregucci, S.; Mammini, P.; Marchiori, G.; Massa, M.; Morsani, F.; Paoloni, E.; Piendibene, M.

    2010-01-01

    We report on recent beam test results for the APSEL4D chip, a new deep n-well MAPS prototype with a full in-pixel signal processing chain obtained by exploiting the triple well option of the CMOS 0.13μm process. The APSEL4D chip consists of a 4096 pixel matrix (32 rows and 128 columns) with 50x50μm 2 pixel cell area, with custom readout architecture capable of performing data sparsification at pixel level. APSEL4D has been characterized in terms of charge collection efficiency and intrinsic spatial resolution under different conditions of discriminator threshold settings using a 12 GeV/c proton beam in the T9 area of the CERN PS. We observe a maximum hit efficiency of 92% and we estimate an intrinsic resolution of about 14μm. The data driven approach of the tracking detector readout chips has been successfully used to demonstrate the possibility to build a Level 1 trigger system based on associative memories. The analysis of the beam test data is critically reviewed along with the characterization of the device under test.

  20. The electromagnetic integrated demonstration at the Idaho National Engineering Laboratory cold test pit

    International Nuclear Information System (INIS)

    Pellerin, L.; Alumbaugh, D.L.; Pfeifer, M.C.

    1997-01-01

    The electromagnetic integrated demonstration (EMID) is a baseline study in electromagnetic (EM) exploration of the shallow subsurface (< 10 m). Eleven distinct EM systems, covering the geophysical spectrum, acquired data on a grid over the Idaho National Engineering Laboratory (INEL) Cold Test Pit (CTP). The systems are investigated and evaluated for the purpose of identifying and reviewing existing geophysical characterization instrumentation (commercial and experimental), integrating those technologies with multi-dimensional interpretational algorithms, and identifying gaps in shallow subsurface EM imaging technology. The EMID data, are valuable for testing and evaluating new interpretational software, and developing techniques for integrating multiple datasets. The experimental field techniques shows how the acquisition of data in a variety of array configurations can considerably enhance interpretation. All data are available on the world wide web. Educators and students are encouraged to use the data for both classroom and graduate studies. The purpose of this paper is to explain why, where, how and what kind of data were collected. It is left to the reader to assess the value of a given system for their particular application. Information about the EMID is organized into two general categories: survey description and system evaluation

  1. MOD-RTG multicouple test results and mission readiness

    International Nuclear Information System (INIS)

    Hartman, R.F.; Kelly, C.E.

    1993-01-01

    MOD-RTG represents the design configuration for the next generation of Radioisotope Thermoelectric Generators (RTG), aimed at improving specific power and efficiency over current General Purpose Heat Source Radioisotope Thermoelectric Generators (GPHS-RTGs). The modular RTG reference design has been described in previous papers (Hartman 1988). The multicouple is a key element required for the successful development of the modular RTG. The multicouple is a high voltage, thermoelectric device employing a close packed, glass bonded thermopile array of twenty thermoelectric couples, connected in a series circuit. The multicouple is designed to operate at a 1270 K hot junction temperature and a 570 K cold junction temperature, yielding a power output of approximately 2.1 watts at 3.5 volts at beginning of life. The objectives of the MOD-RTG program are focused on establishing a multicouple life test data base and life prediction capability which will permit, with reasonable margin, a projected multicouple life of greater than eight (8) years. This paper summarizes the current status of multicouple life testing and performance modeling and the level of technology readiness needed to demonstrate mission readiness for MOD-RTG

  2. Influence of test conditions and exposure duration on the result of ecotoxicological tests

    DEFF Research Database (Denmark)

    Rosenkrantz, Rikke Tjørnhøj

    be calculated from results of ecotoxicological tests performed according to internationally approved guidelines, such as from the Organisation for Economic Co-operation and Development (OECD) or International Standardization Organisation (ISO). Such guidelines were originally developed to enable classification......H and exposure duration on the toxicity recorded in tests using four sulfonylurea herbicides (SUs) and the aquatic macrophyte Lemna gibba as study objects. The study showed that changing the physical and chemical test conditions influenced the toxicity of sulfonylurea herbicides towards L. gibba. Lowering...

  3. How do people respond to self-test results? A cross-sectional survey

    Directory of Open Access Journals (Sweden)

    de Vries Nanne K

    2010-10-01

    Full Text Available Abstract Background Self-tests, tests on medical conditions that can be performed by consumers without consulting a doctor first, are frequently used. Nevertheless, there are concerns about the safety of self-testing, as it may delay diagnosis and appropriate treatment in the case of inappropriate use of the test, or false-negative results. It is unclear whether self-tests stimulate appropriate follow-up behaviour. Our aim was to examine the frequency of self-test use, consumers' response to self-test results in terms of their confidence in the result, reassurance by the test result, and follow-up behaviour. Methods A two step cross-sectional survey was designed. A random sample of 6700 Internet users in an existing Internet panel received an online questionnaire on the use of self-tests. Self-tests were defined as tests on body materials, initiated by consumers with the aim to diagnose a disease or risk factor. A second questionnaire on consumers' response to self-test results was sent to the respondents that were identified as a self-tester in the first questionnaire (n = 703. Results 18.1% (799/4416 of the respondents had ever performed a self-test, the most frequently used tests being those for diabetes (5.3%, kidney disease (4.9%, cholesterol (4.5%, urinary tract infection (1.9% and HIV/AIDS and Chlamydia (both 1.6%. A total of 78.1% of the testers with a normal test result and 81.4% of those with an abnormal result reported confidence in this result. Almost all (95.6% of the testers with a normal result felt reassured. After a normal result, 78.1% did not take any further action and 5.8% consulted a doctor. The corresponding figures after an abnormal test result were 9.3% and 72.2%, respectively. Conclusions Respondents who had performed a self-test seemed to base their follow-up behaviour on the result of the test. They had confidence in the test result, and were often reassured by a normal result. After an abnormal result, most self

  4. Cone Penetrometer N Factor Determination Testing Results

    Energy Technology Data Exchange (ETDEWEB)

    Follett, Jordan R.

    2014-03-05

    This document contains the results of testing activities to determine the empirical 'N Factor' for the cone penetrometer in kaolin clay simulant. The N Factor is used to releate resistance measurements taken with the cone penetrometer to shear strength.

  5. SLD liquid argon calorimeter prototype test results

    International Nuclear Information System (INIS)

    Dubois, R.; Eigen, G.; Au, Y.

    1985-10-01

    The results of the SLD test beam program for the selection of a calorimeter radiator composition within a liquid argon system are described, with emphasis on the study of the use of uranium to obtain equalization of pion and electron responses

  6. U.S. Department of Energy, Office of Technology Development, mixed-waste treatment research, development, demonstration, testing, and evaluation

    International Nuclear Information System (INIS)

    Berry, J.B.

    1993-01-01

    Both chemically hazardous and radioactive species contaminate mixed waste. Historically, technology has been developed to treat either hazardous or radioactive waste. Technology specifically designed to produce a low-risk final waste form for mixed low-level waste has not been developed, demonstrated, or tested. Site-specific solutions to management of mixed waste have been initiated; however, site-specific programs result in duplication of technology development effort between various sites. There is a clear need for technology designed to meet the unique requirements for mixed-waste processing and a system-wide integrated strategy for developing technology and managing mixed waste. This paper discusses the US Department of Energy (DOE) approach to addressing these unique requirements through a national technology development effort

  7. Demonstration of the Military Ecological Risk Assessment Framework (MERAF): Apache Longbow - Hell Missile Test at Yuma Proving Ground

    Energy Technology Data Exchange (ETDEWEB)

    Efroymson, R.A.

    2002-05-09

    This ecological risk assessment for a testing program at Yuma Proving Ground, Arizona, is a demonstration of the Military Ecological Risk Assessment Framework (MERAF; Suter et al. 2001). The demonstration is intended to illustrate how risk assessment guidance concerning-generic military training and testing activities and guidance concerning a specific type of activity (e.g., low-altitude aircraft overflights) may be implemented at a military installation. MERAF was developed with funding from the Strategic Research and Development Program (SERDP) of the Department of Defense. Novel aspects of MERAF include: (1) the assessment of risks from physical stressors using an ecological risk assessment framework, (2) the consideration of contingent or indirect effects of stressors (e.g., population-level effects that are derived from habitat or hydrological changes), (3) the integration of risks associated with different component activities or stressors, (4) the emphasis on quantitative risk estimates and estimates of uncertainty, and (5) the modularity of design, permitting components of the framework to be used in various military risk assessments that include similar activities. The particular subject of this report is the assessment of ecological risks associated with a testing program at Cibola Range of Yuma Proving Ground, Arizona. The program involves an Apache Longbow helicopter firing Hellfire missiles at moving targets, i.e., M60-A1 tanks. Thus, the three component activities of the Apache-Hellfire test were: (1) helicopter overflight, (2) missile firing, and (3) tracked vehicle movement. The demonstration was limited, to two ecological endpoint entities (i.e., potentially susceptible and valued populations or communities): woody desert wash communities and mule deer populations. The core assessment area is composed of about 126 km{sup 2} between the Chocolate and Middle Mountains. The core time of the program is a three-week period, including fourteen days of

  8. Demonstration of the Military Ecological Risk Assessment Framework (MERAF): Apache Longbow - Hell Missile Test at Yuma Proving Ground

    International Nuclear Information System (INIS)

    Efroymson, R.A.

    2002-01-01

    This ecological risk assessment for a testing program at Yuma Proving Ground, Arizona, is a demonstration of the Military Ecological Risk Assessment Framework (MERAF; Suter et al. 2001). The demonstration is intended to illustrate how risk assessment guidance concerning-generic military training and testing activities and guidance concerning a specific type of activity (e.g., low-altitude aircraft overflights) may be implemented at a military installation. MERAF was developed with funding from the Strategic Research and Development Program (SERDP) of the Department of Defense. Novel aspects of MERAF include: (1) the assessment of risks from physical stressors using an ecological risk assessment framework, (2) the consideration of contingent or indirect effects of stressors (e.g., population-level effects that are derived from habitat or hydrological changes), (3) the integration of risks associated with different component activities or stressors, (4) the emphasis on quantitative risk estimates and estimates of uncertainty, and (5) the modularity of design, permitting components of the framework to be used in various military risk assessments that include similar activities. The particular subject of this report is the assessment of ecological risks associated with a testing program at Cibola Range of Yuma Proving Ground, Arizona. The program involves an Apache Longbow helicopter firing Hellfire missiles at moving targets, i.e., M60-A1 tanks. Thus, the three component activities of the Apache-Hellfire test were: (1) helicopter overflight, (2) missile firing, and (3) tracked vehicle movement. The demonstration was limited, to two ecological endpoint entities (i.e., potentially susceptible and valued populations or communities): woody desert wash communities and mule deer populations. The core assessment area is composed of about 126 km 2 between the Chocolate and Middle Mountains. The core time of the program is a three-week period, including fourteen days of

  9. Road surface erosion on the Jackson Demonstration State Forest: results of a pilot study

    Science.gov (United States)

    Brian Barrett; Rosemary Kosaka; David. Tomberlin

    2012-01-01

    This paper presents results of a 3 year pilot study of surface erosion on forest roads in the Jackson Demonstration State Forest in California’s coastal redwood region. Ten road segments representing a range of surface, grade, and ditch conditions were selected for the study. At each segment, settling basins with tipping buckets were installed to measure...

  10. Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2000

    International Nuclear Information System (INIS)

    Spane, Frank A; Thorne, Paul D; Newcomer, Darrell R

    2001-01-01

    This report provides the results of detailed hydrologic characterization tests conducted within eleven Hanford Site wells during fiscal year 2000. Detailed characterization tests performed included groundwater-flow characterization; barometric response evaluation; slug tests; single-well tracer tests; constant-rate pumping tests; and in-well, vertical flow tests. Hydraulic property estimates obtained from the detailed hydrologic tests include transmissivity; hydraulic conductivity; specific yield; effective porosity; in-well, lateral flow velocity; aquifer-flow velocity; vertical distribution of hydraulic conductivity (within the well-screen section); and in-well, vertical flow velocity. In addition, local groundwater-flow characteristics (i.e., hydraulic gradient and flow direction) were determined for four sites where detailed well testing was performed

  11. Dynamic underground stripping demonstration project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-04-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation techniques for rapid cleanup of localized underground spills. Called dynamic stripping to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first eight months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques. Tests then began on the contaminated site in FY 1992. This report describes the work at the Clean Site, including design and performance criteria, test results, interpretations, and conclusions. We fielded 'a wide range of new designs and techniques, some successful and some not. In this document, we focus on results and performance, lessons learned, and design and operational changes recommended for work at the contaminated site. Each section focuses on a different aspect of the work and can be considered a self-contained contribution

  12. Results and Interpretation of the WFRD ELS Distillation Down-Select Test Data

    Science.gov (United States)

    Delzeit, Lance Dean; Flynn, Michael; Carter, Layne; Long, David A.

    2010-01-01

    Testing of the Wiped-film Rotating-disk (WFRD) evaporator was conducted in support of the Exploration Life Support Distillation Down-Select Test. The WFRD was constructed at NASA Ames Research Center (ARC) and tested at NASA Marshall Space Flight Center (MSFC). The WFRD was delivered to MSFC in September 2009, and testing of solution #1 and solution #2 immediately following. Solution #1 was composed of humidity condensate and urine, including flush water and pretreatment chemicals. Solution #2 was composed of hygiene water, humidity condensate, and urine, including flush water and pretreatment chemicals. During the testing, the operational parameters of the WFRD were recorded and samples of the feed, brine, and product were collected and analyzed. The steady-state results of processing 414L of feed solution #1 and 1283L of feed solution #2 demonstrated that running the WFRD at a brine temperature of 50 C gave an average production rate of 16.7 L/hr. The specific energy consumption was 80.5W-hr/L. Data Analysis shows that the water recovery rates were 94% and 91%, respectively. The total mass of the WFRD as delivered to MSFC was 300 Kg. The volume of the tests stand rack was 1m width x 0.7m depth x 1.9m height or 1.5 cu m of which about half of the total volume is occupied by equipment. Chemical analysis of the distillate showed an average TOC of 20ppm, a pH of 3.5, and a conductivity of 98 mho/cm. The conductivity of the distillate, compared to the feed, decreased by 98.9%., the total ion concentration decreased by 99.6%, the total organics decreased 98.6%, and the metals were at or below detection limits

  13. FY 1992 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Demonstration test on a methanol reformation type power generation total system; 1992 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Metanoru kaishitsu gata hatsuden total system jissho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    For the promotion of introduction of methanol to oil-fired power plant, based on the results of the element study, operational study was conducted of a 1,000kW class total system plant for which each of the elements was combined, and the FY 1992 results were summarized. In the operational study, data on various kinds of operational study were sampled of each of the simple cycle/regeneration cycle of liquid methanol and simple cycle/regeneration cycle of gas methanol. As to the reformed gas/water injection/regeneration cycle, all functions as a total system plant worked normally, and it was confirmed that the reformed gas/water injection/regeneration cycle operation could be made possible. Besides, the following were conducted: confirmation test on the performance of the developmental catalyst used in the operational study by bench-scale test device, trial operation for adjustment of gas turbine and combustion study such as the performance test in each cycle, manufacture/study of catalyst for the total system, study for longevity of catalyst for the total system, etc. (NEDO)

  14. Graphite Isotope Ratio Method Development Report: Irradiation Test Demonstration of Uranium as a Low Fluence Indicator

    International Nuclear Information System (INIS)

    Reid, B.D.; Gerlach, D.C.; Love, E.F.; McNeece, J.P.; Livingston, J.V.; Greenwood, L.R.; Petersen, S.L.; Morgan, W.C.

    1999-01-01

    This report describes an irradiation test designed to investigate the suitability of uranium as a graphite isotope ratio method (GIRM) low fluence indicator. GIRM is a demonstrated concept that gives a graphite-moderated reactor's lifetime production based on measuring changes in the isotopic ratio of elements known to exist in trace quantities within reactor-grade graphite. Appendix I of this report provides a tutorial on the GIRM concept

  15. New Technology Demonstration Program - Results of an Attempted Field Test of Multi-Layer Light Polarizing Panels in an Office Space

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2001-06-14

    An assessment of the potential energy savings associated with the use of multi-layer light polarizing panels in an office space was initiated as part of the Department of Energy's (DOE) Federal Energy Management Program (FEMP) New Technology Demonstration Program (NTDP) in 1997. This project was intended to provide information on the effectiveness and application of this technology that could help federal energy managers and other interested individuals determine whether this technology had benefits for their occupied spaces. The use of an actual working office area provided the capability of evaluating the technology's effectiveness in the real world.

  16. Field Lysimeter Test Facility: Second year (FY 1989) test results

    International Nuclear Information System (INIS)

    Campbell, M.D.; Gee, G.W.; Kanyid, M.J.; Rockhold, M.L.

    1990-04-01

    The Record of Decision associated with the Hanford Defense Waste Environmental Impact Statement (53 FR 12449-53) commits to an evaluation of the use of protective barriers placed over near-surface wastes. The barrier must protect against wind and water erosion and limit plant and animal intrusion and infiltration of water. Successful conclusion of this program will yield the necessary protective barrier design for near-surface waste isolation. This report presents results from the second year of tests at the FLTF. The primary objective of testing protective barriers at the FLTF was to measure the water budgets within the various barriers and assess the effectiveness of their designs in limiting water intrusion into the zone beneath each barrier. Information obtained from these measurements is intended for use in refining barrier designs. Four elements of water budget were measured during the year: precipitation, evaporation, storage, and drainage. Run-off, which is a fifth element of a complete water budget, was made negligible by a lip on the lysimeters that protrudes 5 cm above the soil surface to prevent run-off. A secondary objective of testing protective barriers at the FLTF was to refine procedures and equipment to support data collection for verification of the computer model needed for long-term projections of barrier performance. 6 refs

  17. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-02-12

    This document is a draft final report (Volume 1) for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report and Volume II contains appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees} to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.

  18. Spent fuel drying system test results (first dry-run)

    International Nuclear Information System (INIS)

    Klinger, G.S.; Oliver, B.M.; Abrefah, J.; Marschman, S.C.; MacFarlan, P.J.; Ritter, G.A.

    1998-07-01

    The water-filled K-Basins in the Hanford 100 Area have been used to store N-Reactor spent nuclear fuel (SNF) since the 1970s. Because some leaks in the basin have been detected and some of the fuel is breached due to handling damage and corrosion, efforts are underway to remove the fuel elements from wet storage. An Integrated Process Strategy (IPS) has been developed to package, dry, transport, and store these metallic uranium fuel elements in an interim storage facility on the Hanford Site. Information required to support the development of the drying processes, and the required safety analyses, is being obtained from characterization tests conducted on fuel elements removed from the K-Basins. A series of whole element drying tests (reported in separate documents, see Section 7.0) have been conducted by Pacific Northwest National Laboratory (PNNL) on several intact and damaged fuel elements recovered from both the K-East and K-West Basins. This report documents the results of the first dry-run test, which was conducted without a fuel element. The empty test apparatus was subjected to a combination of low- and high-temperature vacuum drying treatments that were intended to mimic, wherever possible, the fuel treatment strategies of the IPS. The data from this dry-run test can serve as a baseline for the first two fuel element tests, 1990 (Run 1) and 3128W (Run 2). The purpose of this dry-run was to establish the background levels of hydrogen in the system, and the hydrogen generation and release characteristics attributable to the test system without a fuel element present. This test also serves to establish the background levels of water in the system and the water release characteristics. The system used for the drying test series was the Whole Element Furnace Testing System, described in Section 2.0, which is located in the Postirradiation Testing Laboratory (PTL, 327 Building). The test conditions and methodology are given in section 3.0, and the experimental

  19. Results and Analysis from Space Suit Joint Torque Testing

    Science.gov (United States)

    Matty, Jennifer

    2010-01-01

    This joint mobility KC lecture included information from two papers, "A Method for and Issues Associated with the Determination of Space Suit Joint Requirements" and "Results and Analysis from Space Suit Joint Torque Testing," as presented for the International Conference on Environmental Systems in 2009 and 2010, respectively. The first paper discusses historical joint torque testing methodologies and approaches that were tested in 2008 and 2009. The second paper discusses the testing that was completed in 2009 and 2010.

  20. Results from the 2013 drug and alcohol testing survey.

    Science.gov (United States)

    2015-12-01

    This report summarizes the results of the 2013 Federal Motor Carrier Safety Administration (FMCSA) Drug and Alcohol Testing Survey. This annual survey measures the percentage of drivers with commercial drivers licenses (CDLs) that test positive fo...