  1. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria

  2. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria

  3. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  4. Gallium-cladding compatibility testing plan. Phases 1 and 2: Test plan for gallium corrosion tests. Revision 2

    International Nuclear Information System (INIS)

    Wilson, D.F.; Morris, R.N.

    1998-05-01

    This test plan is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water-Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. The plan summarizes and updates the projected Phases 1 and 2 Gallium-Cladding compatibility corrosion testing and the following post-test examination. This work will characterize the reactions and changes, if any, in mechanical properties that occur between Zircaloy clad and gallium or gallium oxide in the temperature range 30--700 C

  5. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  6. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  7. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  8. Phase III (full scale) agitated mixing test plan

    International Nuclear Information System (INIS)

    Ruff, D.T.

    1994-01-01

    Waste Receiving and Processing Facility Module 2A (WRAP 2A) is the proposed second module of the WRAP facility. This facility will provide the required treatment for contact Handled (CH) Low Level (LL) Mixed Waste (MW) to allow its permanent disposal. Solidification of a portion of this waste using a cement based grout has been selected in order to reduce the toxicity and mobility of the waste in the disposal site. Mixing of the waste with the cement paste and material handling constraints/requirements associated with the mixed material is, therefore, a key process in the overall treatment strategy. This test plan addresses Phase 3, Full Scale Testing. The objectives of these tests are to determine if there are scale-up issues associated with the mixing results obtained in Phase 1 and 2 mixing tests, verify the workability of mixtures resulting from previous formulation development efforts (Waste Immobilization Development [WID]), and provide a baseline for WRAP 2A mixing equipment design. To this end, the following objectives are of particular interest: determine geometric influence of mixing blade at full scale (i.e., size, type, and location: height/offset); determine if similar results in terms of mixing effectiveness and product quality are achievable at this scale; determine if vibration is as effective at this larger scale in fluidizing the mixture and aiding in cleaning the vessel; determine if baffles or sweeping blades are needed to aid in mixing at the larger size and for cleaning the vessel; and determine quality of the poured monolithic product and investigate exotherm and filling influences at this larger size

  9. Gallium-cladding compatibility testing plan: Phase 3: Test plan for centrally heated surrogate rodlet test. Revision 2

    International Nuclear Information System (INIS)

    Morris, R.N.; Baldwin, C.A.; Wilson, D.F.

    1998-07-01

    The Fissile Materials Disposition Program (FMDP) is investigating the use of weapons grade plutonium in mixed oxide (MOX) fuel for light-water reactors (LWR). Commercial MOX fuel has been successfully used in overseas reactors for many years; however, weapons derived fuel may differ from the previous commercial fuels because of small amounts of gallium impurities. A concern presently exists that the gallium may migrate out of the fuel, react with and weaken the clad, and thereby promote loss of fuel pin integrity. Phases 1 and 2 of the gallium task are presently underway to investigate the types of reactions that occur between gallium and clad materials. This is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. This Plan summarizes the projected Phase 3 Gallium-Cladding compatibility heating test and the follow-on post test examination (PTE). This work will be performed using centrally-heated surrogate pellets, to avoid unnecessary complexities and costs associated with working with plutonium and an irradiation environment. Two sets of rodlets containing pellets prepared by two different methods will be heated. Both sets will have an initial bulk gallium content of approximately 10 ppm. The major emphasis of the PTE task will be to examine the material interactions, particularly indications of gallium transport from the pellets to the clad

  10. Test Plan: Phase 1, Hanford LLW melter tests, GTS Duratek, Inc

    International Nuclear Information System (INIS)

    Eaton, W.C.

    1995-01-01

    This document provides a test plan for the conduct of vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384215] is GTS Duratek, Inc., Columbia, Maryland. The GTS Duratek project manager for this work is J. Ruller. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a DuraMelter trademark vitrification system

  11. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  12. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Link, H.; Keller, J.; Guo, Y.; McNiff, B.

    2013-04-01

    Gearboxes in wind turbines have not been achieving their expected design life even though they commonly meet or exceed the design criteria specified in current design standards. One of the basic premises of the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is that the low gearbox reliability results from the absence of critical elements in the design process or insufficient design tools. Key goals of the GRC are to improve design approaches and analysis tools and to recommend practices and test methods resulting in improved design standards for wind turbine gearboxes that lower the cost of energy (COE) through improved reliability. The GRC uses a combined gearbox testing, modeling and analysis approach, along with a database of information from gearbox failures collected from overhauls and investigation of gearbox condition monitoring techniques to improve wind turbine operations and maintenance practices. Testing of Gearbox 2 (GB2) using the two-speed turbine controller that has been used in prior testing. This test series will investigate non-torque loads, high-speed shaft misalignment, and reproduction of field conditions in the dynamometer. This test series will also include vibration testing using an eddy-current brake on the gearbox's high speed shaft.

  13. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled

  14. Phase II test plan for the evaluation of the performance of container filling systems

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples and will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolidwater and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999

  15. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  16. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  17. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  18. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  19. Test Plan: Phase 1 demonstration of 3-phase electric arc melting furnace technology for vitrifying high-sodium content low-level radioactive liquid wastes

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, W.C. [ed.

    1995-05-31

    This document provides a test plan for the conduct of electric arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384216] is the US Bureau of Mines, Department of the Interior, Albany Research Center, Albany, Oregon. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes feed preparation activities and melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a 3-phase electric arc (carbon electrode) furnace.

  20. Test Plan: Phase 1 demonstration of 3-phase electric arc melting furnace technology for vitrifying high-sodium content low-level radioactive liquid wastes

    International Nuclear Information System (INIS)

    Eaton, W.C.

    1995-01-01

    This document provides a test plan for the conduct of electric arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384216] is the US Bureau of Mines, Department of the Interior, Albany Research Center, Albany, Oregon. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes feed preparation activities and melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a 3-phase electric arc (carbon electrode) furnace

  1. Draft plan for the Waste Isolation Pilot Plant test phase: Performance assessment and operations demonstration

    International Nuclear Information System (INIS)

    1989-04-01

    The mission of the Waste Isolation Pilot Plant (WIPP) Project is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) radioactive wastes resulting from United States defense programs. With the Construction Phase of the WIPP facility nearing completion, WIPP is ready to initiate the next phase in its development, the Test Phase. The purpose of the Test Phase is to collect the necessary scientific and operational data to support a determination whether to proceed to the Disposal Phase and thereby designate WIPP a demonstration facility for the disposal of TRU wastes. This decision to proceed to the Disposal Phase is scheduled for consideration by September 1994. Development of the WIPP facility is the responsibility of the United States Department of Energy (DOE), whose Albuquerque Operations Office has designated the WIPP Project Office as Project Manager. This document describes the two major programs to be conducted during the Test Phase of WIPP: (1) Performance Assessment for determination of compliance with the Environmental Protection Agency Standard and (2) Operations Demonstration for evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP facility. 42 refs., 38 figs., 14 tabs

  2. Waste retrieval sluicing system vapor sampling and analysis plan for evaluation of organic emissions, process test phase III

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained to address vapor issues related to the sluicing of tank 241-C-106. Sampling will be performed in accordance with Waste Retrieval Sluicing System Emissions Collection Phase III (Jones 1999) and Process Test Plan Phase III, Waste Retrieval Sluicing System Emissions Collection (Powers 1999). Analytical requirements include those specified in Request for Ecology Concurrence on Draft Strategy/Path Forward to Address Concerns Regarding Organic Emissions from C-106 Sluicing Activities (Peterson 1998). The Waste Retrieval Sluicing System was installed to retrieve and transfer high-heat sludge from tank 241-C-106 to tank 241-AY-102, which is designed for high-heat waste storage. During initial sluicing of tank 241-C-106 in November 1998, operations were halted due to detection of unexpected high volatile organic compounds in emissions that exceeded regulatory permit limits. Several workers also reported smelling sharp odors and throat irritation. Vapor grab samples from the 296-C-006 ventilation system were taken as soon as possible after detection; the analyses indicated that volatile and semi-volatile organic compounds were present. In December 1998, a process test (phase I) was conducted in which the pumps in tanks 241-C-106 and 241-AY-102 were operated and vapor samples obtained to determine constituents that may be present during active sluicing of tank 241-C-106. The process test was suspended when a jumper leak was detected. On March 7, 1999, phase I1 of the process test was performed; the sluicing system was operated for approximately 7 hours and was ended using the controlled shutdown method when the allowable amount of solids were transferred to 241-AY-102. The phase II test was successful, however, further testing is required to obtain vapor samples at higher emission levels

  3. Test planning and performance

    International Nuclear Information System (INIS)

    Zola, Maurizio

    2001-01-01

    Testing plan should include Safety guide Q4 - Inspection and testing - A testing plan should be prepared including following information: General information (facility name, item or system reference, procurement document reference, document reference number and status, associated procedures and drawings); A sequential listing of all testing activities; Procedure, work instruction, specification or standard to be followed in respect of each operation and test; Acceptance criteria; Identification of who is performing tests; Identification of hold points; Type of records to be prepared for each test; Persons and organizations having authority for final acceptance. Proposed activities sequence is: visual, electrical and mechanical checks; environmental tests (thermal aging, vibrations aging, radioactive aging); performance evaluation in extreme conditions; dynamic tests with functional checks; final electrical and mechanical checks The planning of the tests should always be performed taking into account an interpretative model: a very tight cooperation is advisable between experimental people and numerical people dealing with the analysis of more or less complex models for the seismic assessment of structures and components. Preparatory phase should include the choice of the following items should be agreed upon with the final user of the tests: Excitation points, Excitation types, Excitation amplitude with respect to frequency, Measuring points. Data acquisition, recording and storage, should take into account the characteristics of the successive data processing: to much data can be cumbersome to be processed, but to few data can make unusable the experimental results. The parameters for time history acquisition should be chosen taking into account data processing: for Shock Response Spectrum calculation some special requirements should be met: frequency bounded signal, high frequency sampling, shock noise. For stationary random-like excitation, the sample length

  4. Test Room Stability Plan

    International Nuclear Information System (INIS)

    1993-01-01

    This plan documents the combination of designs, installations, programs, and activities that ensures that the underground excavations at the Waste Isolation Pilot Plant (WIPP), in which transuranic (TRU) waste may be emplaced during the Test Phase, will remain sufficiently stable and safe during that time. The current ground support systems installed at the WIPP are the result of over ten years of data collection from hundreds of geomechanical instruments and thousands of hours of direct observation of the changing conditions of the openings. In addition, some of the world's most respected experts on salt rock mechanics have provided input in the design process and concurrence on the suitability of the final design. The general mine rockbolt pattern and the ground support system for the test rooms are designed to specifically address the fracture and deformation geometries observed today at the WIPP. After an introductory chapter, this plan describes the general underground design, then proceeds to an account of general ground support performance, and finally focuses on the details of the special test room ground support systems. One such system already installed in Room 1, Panel 1, is described in comprehensive detail. Other test rooms in Panel 1, whether full-size or smaller, will be equipped with systems that ensure stability to the same or equivalent extent. They will benefit from the experience gained in the first test room, which in turn benefitted from the data and knowledge accumulated during previous stages (e.g., the Site and Preliminary Design Validation program) of the project

  5. Test plan: Effects of phase separation on waste loading for high level waste glasses

    International Nuclear Information System (INIS)

    Jantzen, C.M.

    2000-01-01

    As part of the Tanks Focus Area's (TFA) effort to increase waste loading for high-level waste (HLW) vitrification at various facilities in the Department of Energy (DOE) complex, the occurrence of phase separation in waste glasses spanning the Savannah River Site (SRS) and Idaho National Engineering and Environmental Laboratory (INEEL) composition ranges were studied during FY99. The type, extent, and impact of phase separation on glass durability for a series of HLW glasses, e.g., SRS-type and INEEL-type, were examined

  6. Integrated corridor management initiative : demonstration phase evaluation. Dallas institutional and organizational analysis test plan.

    Science.gov (United States)

    2000-10-01

    The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...

  7. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  8. Biodiesel Test Plan

    Science.gov (United States)

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  9. Test plans for availability

    International Nuclear Information System (INIS)

    Rise, J.L.; Bjoerklund, O.

    1978-12-01

    In this work is developed principles for statistical test plans for availability compliance tests. Failure terminated and time terminated fixed size plans are considered as well as sequential test plans without and with failure and time truncation. The suggested methods are evaluated with respect to some important characteristics, namely the average number of failures to termination, the duration of the test and the operating characteristic function. The methods used are based on the assumption that up- and down-times can be considered gamma distributed. Simulation studies indicate that the methods are robust against reasonable deviations in distribution assumptions for the down-times. In the work is also outlined technical conditions and prerequisites applicable to availability compliance tests in general. The approach choosen seems very promising and is worth further development. It is based on the same fundamental principles as present is used in International standardization of equipment reliability testing. (author)

  10. Succession planning : phase II.

    Science.gov (United States)

    2008-06-01

    Succession planning is an organizational investment in the future. Institutional : knowledge is a critical ingredient in the culture of an organization, and its intangible : value becomes significant when an organization is faced with the need to pas...

  11. Program plan for the Brayton Isotope Power System. Phase I. Design, fabrication and test of the Brayton Isotope Power System

    International Nuclear Information System (INIS)

    1975-01-01

    Phase I of an overall program for the development of a 500 to 2000 W(e) (EOM), 7-y life, power system for space vehicles is discussed. The system uses a closed Brayton dynamic system to convert energy from an isotope heat source at a net efficiency greater than 25 percent. This first phase, a 35-month effort, is for the conceptual design of a 1300 W(e), 450 lb flight system and the design, fabrication, and test of a ground demonstration system. The flight system will use, for the baseline design, two of the multihundred-watt (MHW) heat sources being developed. The Ground Demonstration System will simulate, as closely as possible, the Brayton Isotope Power Flight System and will utilize components and technology being developed for the Mini-Brayton rotating unit, recuperator and heat source assembly, respectively. The Ground Demonstration System includes a performance test and a 1000-h endurance test

  12. Acceptance Test Plan for ANSYS Software

    International Nuclear Information System (INIS)

    CREA, B.A.

    2000-01-01

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled

  13. Disposal phase experimental program plan

    International Nuclear Information System (INIS)

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes

  14. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  15. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  16. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  17. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  18. Instrumentation Cables Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Chris Bensdotter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteria 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift

  19. Initiating the Validation of CCIM Processability for Multi-phase all Ceramic (SYNROC) HLW Form: Plan for Test BFY14CCIM-C

    Energy Technology Data Exchange (ETDEWEB)

    Maio, Vince [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-08-01

    This plan covers test BFY14CCIM-C which will be a first–of–its-kind demonstration for the complete non-radioactive surrogate production of multi-phase ceramic (SYNROC) High Level Waste Forms (HLW) using Cold Crucible Induction Melting (CCIM) Technology. The test will occur in the Idaho National Laboratory’s (INL) CCIM Pilot Plant and is tentatively scheduled for the week of September 15, 2014. The purpose of the test is to begin collecting qualitative data for validating the ceramic HLW form processability advantages using CCIM technology- as opposed to existing ceramic–lined Joule Heated Melters (JHM) currently producing BSG HLW forms. The major objectives of BFY14CCIM-C are to complete crystalline melt initiation with a new joule-heated resistive starter ring, sustain inductive melting at temperatures between 1600 to 1700°C for two different relatively high conductive materials representative of the SYNROC ceramic formation inclusive of a HLW surrogate, complete melter tapping and pouring of molten ceramic material in to a preheated 4 inch graphite canister and a similar canister at room temperature. Other goals include assessing the performance of a new crucible specially designed to accommodate the tapping and pouring of pure crystalline forms in contrast to less recalcitrant amorphous glass, assessing the overall operational effectiveness of melt initiation using a resistive starter ring with a dedicated power source, and observing the tapped molten flow and subsequent relatively quick crystallization behavior in pans with areas identical to standard HLW disposal canisters. Surrogate waste compositions with ceramic SYNROC forming additives and their measured properties for inductive melting, testing parameters, pre-test conditions and modifications, data collection requirements, and sampling/post-demonstration analysis requirements for the produced forms are provided and defined.

  20. Data management implementation plan for the Bear Creek Valley treatability study phase 2 hydraulic performance testing, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-12-01

    The overall objective of the Bear Creek Valley treatability study is to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. The ultimate goal of this effort is to install a treatment system that will remove uranium, technetium, nitrate, and several metals from groundwater before it reaches Bear Creek. This project, the Bear Creek Valley treatability study Phase 2 hydraulic performance testing, directly supports the Bear Creek Valley Feasibility Study. Specific project objectives include (1) installing monitoring and extraction wells, (2) installing a groundwater extraction trench, (3) performing pumping tests of the extraction wells and trench, (4) determining hydraulic gradients, and (5) collecting water quality parameters. The primary purpose of environmental data management is to provide a system for generating and maintaining technically defensible data. To meet current regulatory requirements for the Environmental Restoration Program, complete documentation of the information flow must be established. To do so, each step in the data management process (collection, management, storage, and analysis) must be adequately planned and documented. This document will serve to identify data management procedures, expected data types and flow, and roles and responsibilities for all data management activities associated with this project

  1. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  2. 100 Area soil washing treatability test plan

    International Nuclear Information System (INIS)

    1993-03-01

    This test plan describes specifications, responsibilities, and general methodology for conducting a soil washing treatability study as applied to source unit contamination in the 100 Area. The objective ofthis treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. The purpose of separating these fractions is to minimize the volume of soil requiring permanent disposal. It is anticipated that this treatability study will be performed in two phases of testing, a remedy screening phase and a remedy selection phase. The remedy screening phase consists of laboratory- and bench-scale studies performed by Battelle Pacific Northwest laboratories (PNL) under a work order issued by Westinghouse Hanford Company (Westinghouse Hanford). This phase will be used to provide qualitative evaluation of the potential effectiveness of the soil washing technology. The remedy selection phase, consists of pilot-scale testing performed under a separate service contract to be competitively bid under Westinghouse Hanford direction. The remedy selection phase will provide data to support evaluation of the soil washing technology in future feasibility studies for Interim Remedial Measures (IRMs) or final operable unit (OU) remedies. Performance data from these tests will indicate whether applicable or relevant and appropriate requirements (ARARs) or cleanup goals can be met at the site(s) by application of soil washing. The remedy selection tests wig also allow estimation of costs associated with implementation to the accuracy required for the Feasibility Study

  3. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies...

  4. Integration and test planning patterns in different organizations

    NARCIS (Netherlands)

    Jong, de I.S.M.; Boumen, R.; Mortel - Fronczak, van de J.M.; Rooda, J.E.; Tretmans, J.

    2007-01-01

    Planning an integration and test phase is often done by experts in the visited organizations. These experts have a thorough knowledge about the system, integration and testing and the business drivers of an organization. An integration and test plan developedfor an airplane is different than the

  5. Waste feed delivery test and evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    O' TOOLE, S.M.

    1999-09-30

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach.

  6. Waste feed delivery test and evaluation plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach

  7. GPS test range mission planning

    Science.gov (United States)

    Roberts, Iris P.; Hancock, Thomas P.

    The principal features of the Test Range User Mission Planner (TRUMP), a PC-resident tool designed to aid in deploying and utilizing GPS-based test range assets, are reviewed. TRUMP features time history plots of time-space-position information (TSPI); performance based on a dynamic GPS/inertial system simulation; time history plots of TSPI data link connectivity; digital terrain elevation data maps with user-defined cultural features; and two-dimensional coverage plots of ground-based test range assets. Some functions to be added during the next development phase are discussed.

  8. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  9. NASA's Plan for SDLS Testing

    Science.gov (United States)

    Bailey, Brandon

    2015-01-01

    The Space Data Link Security (SDLS) Protocol is a Consultative Committee for Space Data Systems (CCSDS) standard which extends the known Data Link protocols to secure data being sent over a space link by providing confidentiality and integrity services. This plan outlines the approach by National Aeronautics Space Administration (NASA) in performing testing of the SDLS protocol using a prototype based on an existing NASA missions simulator.

  10. Pretest Predictions for Phase II Ventilation Tests

    International Nuclear Information System (INIS)

    Yiming Sun

    2001-01-01

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limited to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M and O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M and O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M and O 2000a)

  11. TWRS Privatization Phase 1 Master Site Plan

    International Nuclear Information System (INIS)

    PARAZIN, R.J.

    1999-01-01

    The U.S. Department of Energy (DOE) has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two privatization phases. Phase I, a 'proof of concept' phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary far privatization to proceed. Once established, privatization will be expanded in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. In conjunction with preparation of the Tank Waste Remediation System (TWRS) Privatization Request for Proposals (RFP)(RL, 1996), a location was selected for the Phase I demonstration facilities (Shord, 1996). The location selected was the area previously developed and characterized for the Grout Disposal Site, adjoining the 200 East Area. The site is of sufficient size for a Private Contractor (PC) to carry out pretreatment, immobilization, and vitrification operations and possesses the required characteristics (e.g., close to feed tanks) to best facilitate the Phase I operations. This overall long-range Master Site Plan (MSP) has been developed to establish a ''baseline'' for the (TWRS) Privatization Phase I (TPPI) PC Site. The MSP depicts the planned layout for the PC Site along with various interfaces between the site and other Hanford utilities and functions. The complete integration of TPPl MSP with overall Hanford Site planning process will assist in establishing the PC site and the necessary priorities to meet the Hanford cleanup mission. The MSP has been developed systematically into a comprehensive, safe, flexible, logical and cost-effective plan. The general philosophy behind the preparation of a MSP for the TPPl program is that it will serve as a single source documentation of the planning for the development of the TPPl complex. The effort will plan temporary and permanent land use, utilities, and traffic flow for the overall program. It will identify needs

  12. In situ treatability test plan

    International Nuclear Information System (INIS)

    1996-08-01

    This document describes the plans for the in situ treatment zone (ISTZ) treatability test for groundwater contaminated with strontium-90. The treatability test is to be conducted at the Hanford Site in Richland, Washington, in a portion of the 100-N Area adjacent to the Columbia River referred to as N-Springs. The purpose of the treatability test is to evaluate the effectiveness of an innovative technology to prevent the discharge of strontium-90 contaminated groundwater into the Columbia River. The ISTZ is a passive technology that consists of placing a treatment agent in the path of the groundwater. The treatment agent must restrict target radioactive contaminants and provide time for the contaminant to decay to acceptable levels. The permeability of the treatment zone must be greater than or equal to that of the surrounding sediments to ensure that the contaminated groundwater flows through the treatment zone agent and not around the agent

  13. Nationwide Plan Review Phase 2 Report

    National Research Council Canada - National Science Library

    2006-01-01

    .... These events tested the Nation's ability to respond to catastrophic events and demonstrated the importance of ensuring the effectiveness of Federal, State, and local plans and the ability to quickly...

  14. Transuranic (TRU) Waste Phase I Retrieval Plan

    CERN Document Server

    McDonald, K M

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval ...

  15. Framework for Railway Phase-based Planning

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Nielsen, Otto Anker

    spending) to evaluate the project alternatives. The comparison result can identify the most cost-efficient solution in a long run and therefore reduce the overall costs. This article defines a phase-based framework to guide the railway maintenance and renewal project planning at strategic level....... The framework evaluates the project options from a larger LCC scope: The costs from train operation companies and passengers, together with the maintenance and renewal costs from Infrastructure Managers are included in the calculation. The framework simplifies the planning processes and the LCC calculation...... and compared. A case study is introduced in the article to demonstrate how the framework works to compare timber sleepers and concrete sleepers from strategic planning level. Two Life Cycle Cost oriented policies are discussed to illustrate: high quality track is necessity to improve the cost efficiency...

  16. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    necessary. The fuel canisters to be processed shall be listed in the Fuel Campaign Letter and are identified in HNF-4898, ''Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specifications (OCRWM)''

  17. AFFTC Instruction 99-1, Test and Evaluation Test Plans

    National Research Council Canada - National Science Library

    Crane, Roger

    2002-01-01

    .... Test Information Sheets (TISs) are actually appendices to test plans and contain sufficient information for use by a flight test engineer to develop flight test cards and for management to discern the overall technical approach being taken...

  18. 100 area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications

  19. Transuranic (TRU) Waste Phase I Retrieval Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    1999-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A', the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-I13 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1,4,20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1,20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  20. Transuranic (TRU) Waste Phase I Retrieval Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1, 4, 20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1 , 20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  1. Water NSTF Design, Instrumentation, and Test Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui; Kilsdonk, Dennis J.; Bremer, Nathan C.; Lomperski, Stephen W.; Kraus, Adam R.; Bucknor, Matthew D.; Lv, Qiuping; Farmer, Mitchell T.

    2017-08-01

    The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released for the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric

  2. Test plan for core drilling ignitability testing

    International Nuclear Information System (INIS)

    Witwer, K.S.

    1996-01-01

    The objective of this testing is to determine if ignition occurs while core drilling in a flammable gas environment. Drilling parameters are chosen so as to provide bounding conditions for the core sampling environment. If ignition does not occur under the conditions set forth in this test, then a satisfactory level of confidence will be obtained which would allow field operations under the normal drilling conditions

  3. Test Plan for WEPTOS #1

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Tetu, Amélie; Ferri, Francesco

    This report presents the test program for the WEPTOS Prototype in Brandsø and should be used during testing in order to prioritize and implement the selected configurations to be tested in the available time frame. One configuration is characterized by a defined combination of device opening angl...

  4. STUDENT PLANNING TIME IN ORAL TESTS

    Institute of Scientific and Technical Information of China (English)

    WangLei

    2004-01-01

    This paper describes the process of planning in an oral test situation. Since many researchers have studied the impact of pretask planning in the Second Language Acquisition (SLA) field and some have explored the same subject into the area of oral tests, the present study tries to make a tentative attempt to see what the test takers are actually doing in the planning time while taking an oral test. A questionnaire was designed with the effort to find out whether planning time results in an increased focus on form, particularly at the level of strategic attention to form.The result of the investigation tells us that restricted by the type of situation, test takers can only plan the framework of what they are going to say, which may differ to the results achieved by previous studies.

  5. Kodak AMSD Cryogenic Test Plans

    Science.gov (United States)

    Matthews, Gary; Hammon, John; Barrett, David; Russell, Kevin (Technical Monitor)

    2002-01-01

    NGST will be an IR based optical system that will operate at cryogenic temperatures. As part of the AMSD program, Kodak must demonstrate the ability of our system to perform at these very cold temperatures. Kodak will discuss the test approach that will be used for cryogenic testing at MSFC's XRCF.

  6. Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

    Science.gov (United States)

    Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.

    1990-01-01

    During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

  7. Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Jeff Wurtz

    2009-07-01

    This Phase II CAIP describes new work needed to potentially reduce uncertainty and achieve increased confidence in modeling results. This work includes data collection and data analysis to refine model assumptions, improve conceptual models of flow and transport in a complex hydrogeologic setting, and reduce parametric and structural uncertainty. The work was prioritized based on the potential to reduce model uncertainty and achieve an acceptable level of confidence in the model predictions for flow and transport, leading to model acceptance by NDEP and completion of the Phase II CAI stage of the UGTA strategy.

  8. Test plan for Tank 241-AW-101 solubility screening tests

    International Nuclear Information System (INIS)

    Person, J.C.

    1998-01-01

    Tank 241-AW-101 (101-AW) has been identified as one of the early tanks to be for retrieved for low level waste pretreatment and immobilization and retrieval of the tank waste may require dilution. This test is to determine the effects of dilution on the mass of solids and their composition. This test plan gives test instructions, example data sheets, a waste compatibility review, and a waste stream fact sheet. This test Plan is similar to tests on tanks 241-AN-102 (Person 1998a) and 241-AN-107 (Person 1998 b). The 101-AW tests will be done with composites of liquid and solids from grab samples that were taken in 1998 (Benar 1998). Future revisions of the Tank Sampling and Analysis Plan (Benar 1998) may change the details of the work performed under this test plan

  9. Using Optimization to Improve Test Planning

    Science.gov (United States)

    2017-09-01

    OPTIMIZATION TO IMPROVE TEST PLANNING by Arlene M. Payne September 2017 Thesis Advisor: Jeffrey E. Kline Second Reader: Oleg A. Yakimenko THIS... Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2017 3. REPORT TYPE AND DATES COVERED Master’s...thesis 4. TITLE AND SUBTITLE USING OPTIMIZATION TO IMPROVE TEST PLANNING 5. FUNDING NUMBERS 6. AUTHOR(S) Arlene M. Payne 7. PERFORMING ORGANIZATION

  10. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  11. Virtual Sensor Test Instrumentation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Mobitrum has started the development of virtual sensor test instrumentation in Phase I for characterization and measurement of ground testing of propulsion systems....

  12. Recovery Efficiency Test Project: Phase 1, Activity report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Wilkins, D.W.; Keltch, B.; Saradji, B.; Salamy, S.P.

    1988-04-01

    This report is the second volume of the Recovery Efficiency Test Phase I Report of Activities. Volume 1 covered selection, well planning, drilling, coring, logging and completion operations. This volume reports on well testing activities, reclamation activities on the drilling site and access roads, and the results of physical and mechanical properties tests on the oriented core material obtained from a horizontal section of the well. 3 refs., 21 figs., 10 tabs.

  13. Light Duty Utility Arm Software Test Plan

    International Nuclear Information System (INIS)

    Kiebel, G.R.

    1995-01-01

    This plan describes how validation testing of the software will be implemented for the integrated control and data acquisition system of the Light Duty Utility Arm System (LDUA). The purpose of LDUA software validation testing is to demonstrate and document that the LDUA software meets its software requirements specification

  14. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  15. Nationwide Plan Review Phase 1 Report

    National Research Council Canada - National Science Library

    2006-01-01

    ...] and the Secretary of Homeland Security, in coordination with Gulf Coast States and contiguous States, shall jointly review and assess Federal and State evacuation plans for catastrophic hurricanes...

  16. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  17. TASK TECHNICAL AND QUALITY ASSURANCE PLAN FOR OUT-OF-TANK DESTRUCTION OF TETRAPHENYLBORATE VIA WET AIR OXIDATION TECHNOLOGY: PHASE I - BENCH SCALE TESTS

    International Nuclear Information System (INIS)

    Adu-Wusu, K

    2006-01-01

    Tank 48H return to service is critical to the processing of high level waste (HLW) at Savannah River Site (SRS). Liquid Waste Disposition (LWD) management has the goal of returning Tank 48H to routine service by January 2010 or as soon as practical. Tank 48H currently holds legacy material containing organic tetraphenylborate (TPB) compounds from the operation of the In-Tank Precipitation process. This material is not compatible with the waste treatment facilities at SRS and must be removed or undergo treatment to destroy the organic compounds before the tank can be returned to Tank Farm service. Tank 48H currently contains ∼240,000 gallons of alkaline slurry with about 2 wt % potassium and cesium tetraphenylborate (KTPB and CsTPB). The main radioactive component in Tank 48H is 137 Cs. The waste also contains ∼0.15 wt % Monosodium Titanate (MST) which has adsorbed 90 Sr, U, and Pu isotopes. A System Engineering Evaluation of technologies/ideas for the treatment of TPB identified Wet Air Oxidation (WAO) as a leading alternative technology to the baseline aggregation approach. Over 75 technologies/ideas were evaluated overall. Forty-one technologies/ideas passed the initial screening evaluation. The 41 technologies/ideas were then combined to 16 complete solutions for the disposition of TPB and evaluated in detail. Wet Air Oxidation (WAO) is an aqueous phase process in which soluble or suspended waste components are oxidized using molecular oxygen contained in air. The process operates at elevated temperatures and pressures ranging from 150 to 320 C and 7 to 210 atmospheres, respectively. The products of the reaction are CO 2 , H 2 O, and low molecular weight oxygenated organics (e.g. acetate, oxalate). The basic flow scheme for a typical WAO system is as follows. The waste solution or slurry is pumped through a high-pressure feed pump. An air stream containing sufficient oxygen to meet the oxygen requirements of the waste stream is injected into the pressurized

  18. DEEP VADOSE ZONE TREATABILITY TEST PLAN

    International Nuclear Information System (INIS)

    Chronister, G.B.; Truex, M.J.

    2009-01-01

    (sm b ullet) Treatability test plan published in 2008 (sm b ullet) Outlines technology treatability activities for evaluating application of in situ technologies and surface barriers to deep vadose zone contamination (technetium and uranium) (sm b ullet) Key elements - Desiccation testing - Testing of gas-delivered reactants for in situ treatment of uranium - Evaluating surface barrier application to deep vadose zone - Evaluating in situ grouting and soil flushing

  19. Surface stability test plan for protective barriers

    International Nuclear Information System (INIS)

    Ligotke, M.W.

    1989-01-01

    Natural-material protective barriers for long-term isolation of buried waste have been identified as integral components of a plan to isolate a number of Hanford defense waste sites. Standards currently being developed for internal and external barrier performance will mandate a barrier surface layer that is resistant to the eolian erosion processes of wind erosion (deflation) and windborne particle deposition (formation of sand dunes). Thus, experiments are needed to measure rates of eolian erosion processes impacting those surfaces under different surface and climatological conditions. Data from these studies will provide information for use in the evaluation of selected surface layers as a means of providing stable cover over waste sites throughout the design life span of protective barriers. The multi-year test plan described in this plan is directed at understanding processes of wind erosion and windborne particle deposition, providing measurements of erosion rates for models, and suggesting construction materials and methods for reducing the effect of long-term eolian erosion on the barrier. Specifically, this plan describes possible methods to measure rates of eolian erosion, including field and laboratory procedure. Advantages and disadvantages of laboratory (wind tunnel) tests are discussed, and continued wind tunnel tests are recommended for wind erosion studies. A comparison between field and wind tunnel erosive forces is discussed. Plans for testing surfaces are described. Guidance is also presented for studying the processes controlling sand dune and blowout formation. 24 refs., 7 figs., 3 tabs

  20. Test Plan Addendum No. 1: Waste Isolation Pilot Plant bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.; Lappin, A.R.

    1990-12-01

    This document is the first major revision to the Test Plan: WIPP Bin-Scale CH TRU Waste Tests. Factors that make this revision necessary are described and justified in Section 1, and elaborated upon in Section 4. This addendum contains recommended estimates of, and details for: (1) The total separation of waste leaching/solubility tests from bin-scale gas tests, including preliminary details and quantities of leaching tests required for testing of Levels 1, 2, and 3 WIPP CH TRU wastes; (2) An initial description and quantification of bin-scale gas test Phase 0, added to provide a crucial tie to pretest waste characterization representatives and overall test statistical validation; (3) A revision to the number of test bins required for Phases 1 and 2 of the bin gas test program, and specification of the numbers of additional bin tests required for incorporating gas testing of Level 2 wastes into test Phase 3. Contingencies are stated for the total number of test bins required, both positive and negative, including the supporting assumptions, logic, and decision points. (4) Several other general test detail updates occurring since the Test Plan was approved and published in January, 1990. Possible impacts of recommended revisions included in this Addendum on WIPP site operations are called out and described. 56 refs., 12 tabs

  1. BWR Full Integral Simulation Test (FIST). Phase I test results

    International Nuclear Information System (INIS)

    Hwang, W.S.; Alamgir, M.; Sutherland, W.A.

    1984-09-01

    A new full height BWR system simulator has been built under the Full-Integral-Simulation-Test (FIST) program to investigate the system responses to various transients. The test program consists of two test phases. This report provides a summary, discussions, highlights and conclusions of the FIST Phase I tests. Eight matrix tests were conducted in the FIST Phase I. These tests have investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. Results and governing phenomena of each test have been evaluated and discussed in detail in this report. One of the FIST program objectives is to assess the TRAC code by comparisons with test data. Two pretest predictions made with TRACB02 are presented and compared with test data in this report

  2. TWRS phase I privatization site environmental baseline and characterization plan

    International Nuclear Information System (INIS)

    Shade, J.W.

    1997-01-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan

  3. Test plan for spent fuel cladding containment credit tests

    International Nuclear Information System (INIS)

    Wilson, C.N.

    1983-11-01

    Lawrence Livermore National Laboratory has chosen Westinghouse Hanford Company as a subcontractor to assist them in determining the requirements for successful disposal of spent fuel rods in the proposed Nevada Test Site repository. An initial scoping test, with the objective of determining whether or not the cladding of a breached fuel rod can be given any credit as an effective barrier to radionuclide release, is described in this test plan. 8 references, 2 figures, 4 tables

  4. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  5. ILAW Glass Testing for Disposal at IDF: Phase 1 Testing

    Energy Technology Data Exchange (ETDEWEB)

    Papathanassiu, Adonia [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Muller, Isabelle S. [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Brandys, Marek [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Gilbo, Konstantin [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Barkatt, Aaron [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Joseph, Innocent [EnergySolutions Federal EPC, Inc., Columbia, MD (United States); The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Pegg, Ian L. [The Catholic Univ. of America, Washington, DC (United States). Virteous State Lab.; Brown, Elvie E. [Washington River Protection Solutions, LLC, Richland, WA (United States); Swanberg, David J. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2011-04-11

    This document reports the results of the testing of phase 1 ORP LAW (low activity waste) glasses, also identified as enhanced LAW glasses. Testing involved are SPFT (Single Pass Flow Through), VHT (Vapor Hydration Test), and PCT (Product Consistency Test), along with the analytical tests (XRD and SEM-EDS). This report contains the data of the high waste loading ORP LAW glasses that will be used for the performance assessment of the IDF (Integrated Disposal Facility).

  6. ILAW Glass Testing for Disposal at IDF: Phase 1 Testing

    International Nuclear Information System (INIS)

    Papathanassiu, Adonia; Swanberg, David J.

    2011-01-01

    This document reports the results of the testing of phase 1 ORP LAW (low activity waste) glasses, also identified as enhanced LAW glasses. Testing involved are SPFT (Single Pass Flow Through), VHT (Vapor Hydration Test), and PCT (Product Consistency Test), along with the analytical tests (XRD and SEM-EDS). This report contains the data of the high waste loading ORP LAW glasses that will be used for the performance assessment of the IDF (Integrated Disposal Facility).

  7. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Science.gov (United States)

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  8. Tests to Help Plan Opportunity Moves

    Science.gov (United States)

    2005-01-01

    Rover engineers check how a test rover moves in material chosen to simulate some difficult Mars driving conditions. The scene is inside the In-Situ Instrument Laboratory at NASA's Jet Propulsion Laboratory, Pasadena, Calif. These tests in early May 2005 were designed to help plan the best way for the rover Opportunity to drive off of a soft-sand dune that the rover dug itself into the previous week. The mixture of sandy and powdery material brought in for these specific tests matched the way the soil underneath Opportunity caked onto wheels, filling the spaces between the cleats on the wheels.

  9. Geochemical Testing And Model Development - Residual Tank Waste Test Plan

    International Nuclear Information System (INIS)

    Cantrell, K.J.; Connelly, M.P.

    2010-01-01

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  10. Test plan, sludge retrieval, sludge packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides direction for the cold testing of tools, equipment and systems which will be installed and operated in K-East (KE) Basin in support of the sludge retrieval and packaging project. The technical uncertainties related to the effectiveness of sludge retrieval procedures and equipment require that cold testing be completed before installation in KE Basin to identify and resolve existing problems, and to optimize the efficiency of all equipment and systems used. This plan establishes the responsibilities, test requirements, and documentation requirements necessary to complete cold tests of: (1) equipment with no potential for plant use; (2) prototype equipment and systems which may be upgraded for use in K-Basin; and (3) plant equipment and systems requiring cold acceptance testing prior to plant use. Some equipment and systems may have been subject to a formal design review and safety assessment; the results of which will be included as supporting documents to the operational readiness review (ORR)

  11. Integrated Test and Evaluation Flight Test 3 Flight Test Plan

    Science.gov (United States)

    Marston, Michael Lawrence

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  12. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  13. LERF Basin 44 Process Test Plan

    International Nuclear Information System (INIS)

    LUECK, K.J.

    1999-01-01

    This document presents a plan to process a portion of the Liquid Effluent Retention Facility (LERF) Basin 44 wastewater through the 200 Area Effluent Treatment Facility (ETF). The objective of this process test is to determine the most effective/efficient method to treat the wastewater currently stored in LERF Basin 44. The process test will determine the operational parameters necessary to comply with facility effluent discharge permit limits (Ecology 1995) and the Environmental Restoration Disposal Facility (ERDF) acceptance criteria (BHI-00139), while achieving ALARA goals and maintaining the integrity of facility equipment. A major focus of the test plan centers on control of contamination due to leaks and/or facility maintenance. As a pre-startup item, all known leaks will be fixed before the start of the test. During the course of the test, a variety of contamination control measures will be evaluated for implementation during the treatment of the remaining Basin 44 inventory. Of special interest will be techniques and tools used to prevent contamination spread during sampling and when opening contaminated facility equipment/piping. At the conclusion of the test, a post ALARA review will be performed to identify lessons learned from the test run which can be applied to the treatment of the remaining Basin 44 inventory. The volume of wastewater to be treated during this test run is 500,000 gallons. This volume limit is necessary to maintain the ETF radiological inventory limits per the approved authorization basis. The duration of the process test is approximately 30 days

  14. 305 Building Cold Test Facility Management Plan

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1994-01-01

    This document provides direction for the conduct of business in Building 305 for cold testing tools and equipment. The Cold Test Facility represents a small portion of the overall building, and as such, the work instructions already implemented in the 305 Building will be utilized. Specific to the Cold Test there are three phases for the tools and equipment as follows: 1. Development and feature tests of sludge/fuel characterization equipment, fuel containerization equipment, and sludge containerization equipment to be used in K-Basin. 2. Functional and acceptance tests of all like equipment to be installed and operated in K-Basin. 3. Training and qualification of K-Basin Operators on equipment to be installed and operated in the Basin

  15. Test plan for ISV laboratory-pyrolysis testing

    Energy Technology Data Exchange (ETDEWEB)

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  16. Hanford Tank Farms Waste Certification Flow Loop Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

    2010-01-01

    A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratory’s facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

  17. Test Plan: WIPP bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs

  18. 118-B-1 excavation treatability test plan

    International Nuclear Information System (INIS)

    1994-07-01

    The Hanford 118-B-1 Burial Ground Treatability Study has been required by milestone change request number-sign M-15-93-04, dated September 30, 1993. The change request requires that a treatability test be conducted at the 100-B Area to obtain additional engineering information for remedial design of burial grounds receiving waste from 100 Area removal actions. This treatability study has two purposes: (1) to support development of the Proposed Plan (PP) and Record of Decision (ROD), which will identify the approach to be used for burial ground remediation, and (2) to provide specific engineering information for receiving waste generated from the 100 Area removal actions. Data generated from this test also will provide critical performance and cost information necessary for remedy evaluation in the detailed analysis of alternatives during preparation of the focused feasibility study (FFS). This treatability testing supports the following 100 Area alternatives: (1) excavation and disposal, and (2) excavation, sorting, (treatment), and disposal

  19. 100 Area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-08-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd 3 of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative

  20. Test of GERDA Phase II detector assembly

    Energy Technology Data Exchange (ETDEWEB)

    Bode, Tobias; Gusev, Konstantin [Technische Universitaet Muenchen (Germany); Schwingenheuer, Bernhard; Wagner, Victoria [Max-Planck Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: GERDA-Collaboration

    2014-07-01

    The GERDA experiment searches for the lepton number violating neutrinoless double beta decay (0νββ) of {sup 76}Ge. The experiment uses HPGe detectors enriched in {sup 76}Ge as source and detection material. In GERDA Phase I five BEGe detectors were operated successfully. These detectors are distinguished for improved energy resolution and enhanced pulse shape discrimination (PSD) against background events. In Phase II additional 25 BEGe detectors will be installed. New electronics and radio-pure low-mass holders were specially designed for Phase II. Prior to the installation in GERDA all BEGe detectors are tested in their final assembly in the LNGS underground laboratory. This talk presents the mechanics and performance of the GERDA Phase II detector assembly.

  1. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    Science.gov (United States)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  2. Plan for decommissioning the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Walton, G.R.

    1993-01-01

    The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D ampersand D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D ampersand D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D ampersand D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D ampersand D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates

  3. Integrated test plan for directional boring

    International Nuclear Information System (INIS)

    Volk, B.W.

    1993-01-01

    This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department of Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing

  4. Phase Planning for Overall Copper-Fiber Switch-over

    DEFF Research Database (Denmark)

    Gutierrez Lopez, Jose Manuel; Jensen, Michael; Andreasen, Morten Henius

    2013-01-01

    This paper introduces a phase planning concept to the imminent copper-fiber switch-over action. Traditional copper loops are to be replaced by modern fiber lines in order to keep up with the current evolution of data communications. This work proposes two novel approaches of how to schedule...... this transition by systematically selecting the most attractive areas, in terms of economic efficiency, to be upgraded first. These are alternatively based on 1) distance to the access point and 2)population density, and the overall plan is divided into three phases. In both cases the final network solution...... is the same, but the different prioritization on what areas to upgrade first implies a different distribution of the investment over the deployment period. Two case studies using real geographical data in Denmark show these differences, and the results suggest that planning the phases based on population...

  5. Test plan for the retrieval demonstration

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1993-05-01

    This test plan describes a simulated buried waste retrieval demonstration that will be performed at the Caterpillar, Inc., Edwards Training Center located near Peoria, Illinois. The purpose of the demonstration is to determine the effectiveness of using readily available excavation equipment to retrieve, size, and handle various simulated waste forms that are similar in size, structure, and composition to those expected to be found in US Department of Energy contaminated waste pits and trenches. The objectives of this demonstration are to: meet and maintain daily production goals of 80 yd 3 /day; minimize spillage and dust generation through careful and deliberate operations; document and evaluate methods for manipulating, sizing, and/or working around large objects; and document and evaluate requirements for operator augmentation and remote operation for hot test pit excavation operations. Four conditions comprising the range of environments to be evaluated include excavation of random material from below grade; stacked boxes and barrels from below grade; random materials from at grade; and stacked boxes and barrels from at grade. Results of the retrieval demonstration will reduce unknowns in the body of knowledge about retrieval equipment and procedural options for removal of buried transuranic (TRU) waste at the Idaho National Engineering Laboratory. It is anticipated that DOE will factor this information into a remedial investigation/feasibility plan leading to a final record of decision for disposition of buried TRU waste

  6. Hanford Waste End Effector Phase I Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, Eric J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hatchell, Brian K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mount, Jason C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Neill, Kevin J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wells, Beric E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A.M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-22

    This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulants to determine pumping rate, dilution factors, and screen fouling rate.

  7. Test plan for dig-face characterization performance testing

    International Nuclear Information System (INIS)

    Josten, N.E.

    1993-09-01

    The dig-face characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since FY 1992 through the support of the Buried Waste Integrated Demonstration Program. A Dig-face Characterization System conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation dig-face and collects data that provide a basis for detecting, locating, and identifying hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes initial efforts to test the dig-face characterization concept at the INEL Cold Test Pit using a simplified prototype apparatus and off-the-shelf sensors. The Cold Test Pit is a simulated waste site containing hazardous and radioactive waste surrogates at known locations. Testing will be directed toward three generic characterization problems: metal detection, plume detection, and radioactive source detection. The prototype apparatus will gather data using magnetometers, a ground conductivity meter, a trace gas analyzer, and a gamma ray sensor during simulated retrieval of the surrogate waste materials. The data acquired by a dig-face characterization system are unique because of the high precision, high data density, and multiple viewpoints attainable through the dig-face deployment approach. The test plan establishes procedures for collecting and validating a representative dig-face characterization data set. Analysis of these data will focus on developing criteria for predicting the depth, location, composition, and other characteristics of the surrogate waste materials. If successful, this proof-of-concept exercise will provide a foundation for future development of a fully-operational system that is capable of operating on an actual waste site

  8. 42 CFR 137.20 - What is required during the planning phase?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What is required during the planning phase? 137.20... Participation in Self-Governance Planning Phase § 137.20 What is required during the planning phase? The planning phase must be conducted to the satisfaction of the Indian Tribe and must include: (a) legal and...

  9. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  10. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  11. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  12. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  13. Tracer gas diffusion sampling test plan

    International Nuclear Information System (INIS)

    Rohay, V.J.

    1993-01-01

    Efforts are under way to employ active and passive vapor extraction to remove carbon tetrachloride from the soil in the 200 West Area an the Hanford Site as part of the 200 West Area Carbon Tetrachloride Expedited Response Action. In the active approach, a vacuum is applied to a well, which causes soil gas surrounding the well to be drawn up to the surface. The contaminated air is cleaned by passage through a granular activated carbon bed. There are questions concerning the radius of influence associated with application of the vacuum system and related uncertainties about the soil-gas diffusion rates with and without the vacuum system present. To address these questions, a series of tracer gas diffusion sampling tests is proposed in which an inert, nontoxic tracer gas, sulfur hexafluoride (SF 6 ), will be injected into a well, and the rates of SF 6 diffusion through the surrounding soil horizon will be measured by sampling in nearby wells. Tracer gas tests will be conducted at sites very near the active vacuum extraction system and also at sites beyond the radius of influence of the active vacuum system. In the passive vapor extraction approach, barometric pressure fluctuations cause soil gas to be drawn to the surface through the well. At the passive sites, the effects of barometric ''pumping'' due to changes in atmospheric pressure will be investigated. Application of tracer gas testing to both the active and passive vapor extraction methods is described in the wellfield enhancement work plan (Rohay and Cameron 1993)

  14. Reliability demonstration test planning using bayesian analysis

    International Nuclear Information System (INIS)

    Chandran, Senthil Kumar; Arul, John A.

    2003-01-01

    In Nuclear Power Plants, the reliability of all the safety systems is very critical from the safety viewpoint and it is very essential that the required reliability requirements be met while satisfying the design constraints. From practical experience, it is found that the reliability of complex systems such as Safety Rod Drive Mechanism is of the order of 10 -4 with an uncertainty factor of 10. To demonstrate the reliability of such systems is prohibitive in terms of cost and time as the number of tests needed is very large. The purpose of this paper is to develop a Bayesian reliability demonstrating testing procedure for exponentially distributed failure times with gamma prior distribution on the failure rate which can be easily and effectively used to demonstrate component/subsystem/system reliability conformance to stated requirements. The important questions addressed in this paper are: With zero failures, how long one should perform the tests and how many components are required to conclude with a given degree of confidence, that the component under test, meets the reliability requirement. The procedure is explained with an example. This procedure can also be extended to demonstrate with more number of failures. The approach presented is applicable for deriving test plans for demonstrating component failure rates of nuclear power plants, as the failure data for similar components are becoming available in existing plants elsewhere. The advantages of this procedure are the criterion upon which the procedure is based is simple and pertinent, the fitting of the prior distribution is an integral part of the procedure and is based on the use of information regarding two percentiles of this distribution and finally, the procedure is straightforward and easy to apply in practice. (author)

  15. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  16. GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation

    International Nuclear Information System (INIS)

    Tang, I.M.; Harmon, D.P.; Torri, A.

    1978-12-01

    The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects

  17. General Vehicle Test Plan (GVTP) for Urban Rail Transit Cars

    Science.gov (United States)

    1977-09-01

    The General Vehicle Test Plan provides a system for general vehicle testing and for documenting and utilizing data and information in the testing of urban rail transit cars. Test procedures are defined for nine categories: (1) Performance; (2) Power ...

  18. Phase Transitions in Planning Problems: Design and Analysis of Parameterized Families of Hard Planning Problems

    Science.gov (United States)

    Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide

    2014-01-01

    There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning

  19. Test Plan for the overburden removal demonstration

    International Nuclear Information System (INIS)

    Rice, P.; Thompson, D.; Winberg, M.; Skaggs, J.

    1993-06-01

    The removal of soil overburdens from contaminated pits and trenches involves using equipment that will remove a small layer of soil from 3 to 6 in. at any time. As a layer of soil is removed, overburden characterization techniques perform surveys to a depth that exceeds each overburden removal layer to ensure that the removed soil will be free of contamination. It is generally expected that no contamination will be found in the soil overburden, which was brought in after the waste was put in place. It is anticipated that some containers in the waste zone have lost their integrity, and the waste leakage from those containers has migrated by gravity downward into the waste zone. To maintain a safe work environment, this method of overburden removal should allow safe preparation of a pit or trench for final remediation. To demonstrate the soil overburden techniques, the Buried Waste Integrated Demonstration Program has contracted vendor services to provide equipment and techniques demonstrating soil overburden removal technology. The demonstration will include tests that will evaluate equipment performance and techniques for removal of overburden soil, control of contamination spread, and dust control. To evaluate the performance of these techniques, air particulate samples, physical measurements of the excavation soil cuts, maneuverability measurements, and time versus volume (rate) of soil removal data will be collected during removal operations. To provide a medium for sample evaluation, the overburden will be spiked at specific locations and depths with rare earth tracers. This test plan will be describe the objectives of the demonstration, data quality objectives, methods to be used to operate the equipment and use the techniques in the test area, and methods to be used in collecting data during the demonstration

  20. Test plan for Enraf Series 854 level gauge wire testing

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1994-01-01

    An Enraf Series 854 level gauge was installed on tank 241-S-106 during the first week of June 1994. On August 11, 1994, the gauge's stainless steel measuring wire broke. After examination and laboratory analysis, it was determined that the wire broke due to severe chloride ion corrosion. It is suspected that the chloride ion contamination came from the radiation induced breakdown of the polyvinyl chloride (PVC) riser liner. It is well documented that the breakdown of PVC due to radiation produces chloride containing compounds. This document provides a qualification test plan to remove and have analyzed the wire in all of the Enraf Series 854 that have been installed to date. These tests will confirm the presence or absence of chloride ions in the PVC liners and/or on the Enraf measuring wires installed in the tanks. This test will involve removing the 316 stainless steel wire drums from all of the existing Enraf Series 854 level gauges that have been installed. New 316 stainless steel wire drums shall be installed into the gauges and the gauges will be placed back into service. The wire that is removed from the gauges shall be sent to the 222-S Lab or the Pacific Northwest Laboratory (PNL) for analysis. Additional wire replacements will occur at intervals as determined necessary by the results of the laboratory analyses

  1. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  2. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  3. Airborne Data Link Operational Evaluation Test Plan

    Science.gov (United States)

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  4. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  5. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  6. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  9. Space Weather Action Plan Ionizing Radiation Benchmarks: Phase 1 update and plans for Phase 2

    Science.gov (United States)

    Talaat, E. R.; Kozyra, J.; Onsager, T. G.; Posner, A.; Allen, J. E., Jr.; Black, C.; Christian, E. R.; Copeland, K.; Fry, D. J.; Johnston, W. R.; Kanekal, S. G.; Mertens, C. J.; Minow, J. I.; Pierson, J.; Rutledge, R.; Semones, E.; Sibeck, D. G.; St Cyr, O. C.; Xapsos, M.

    2017-12-01

    Changes in the near-Earth radiation environment can affect satellite operations, astronauts in space, commercial space activities, and the radiation environment on aircraft at relevant latitudes or altitudes. Understanding the diverse effects of increased radiation is challenging, but producing ionizing radiation benchmarks will help address these effects. The following areas have been considered in addressing the near-Earth radiation environment: the Earth's trapped radiation belts, the galactic cosmic ray background, and solar energetic-particle events. The radiation benchmarks attempt to account for any change in the near-Earth radiation environment, which, under extreme cases, could present a significant risk to critical infrastructure operations or human health. The goal of these ionizing radiation benchmarks and associated confidence levels will define at least the radiation intensity as a function of time, particle type, and energy for an occurrence frequency of 1 in 100 years and an intensity level at the theoretical maximum for the event. In this paper, we present the benchmarks that address radiation levels at all applicable altitudes and latitudes in the near-Earth environment, the assumptions made and the associated uncertainties, and the next steps planned for updating the benchmarks.

  10. Ozone-depleting-substance control and phase-out plan

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brown, M.J.

    1994-07-01

    Title VI of the Federal Clean Air Act Amendments of 1990 requires regulation of the use and disposal of ozone-depleting substances (ODSs) (e.g., Halon, Freon). Several important federal regulations have been promulgated that affect the use of such substances at the Hanford Site. On April 23, 1993, Executive Order (EO) 12843, Procurement Requirements and Policies for Federal Agencies for Ozone-Depleting Substances (EPA 1993) was issued for Federal facilities to conform to the new US Environmental Protection Agency (EPA) regulations implementing the Clean Air Act of 1963 (CAA), Section 613, as amended. To implement the requirements of Title VI the US Department of Energy, Richland Operations Office (RL), issued a directive to the Hanford Site contractors on May 25, 1994 (Wisness 1994). The directive assigns Westinghouse Hanford Company (WHC) the lead in coordinating the development of a sitewide comprehensive implementation plan to be drafted by July 29, 1994 and completed by September 30, 1994. The implementation plan will address several areas where immediate compliance action is required. It will identify all current uses of ODSs and inventories, document the remaining useful life of equipment that contains ODS chemicals, provide a phase-out schedule, and provide a strategy that will be implemented consistently by all the Hanford Site contractors. This plan also addresses the critical and required elements of Federal regulations, the EO, and US Department of Energy (DOE) guidance. This plan is intended to establish a sitewide management system to address the clean air requirements

  11. Transmission Network Expansion Planning Considering Phase-Shifter Transformers

    Directory of Open Access Journals (Sweden)

    Celso T. Miasaki

    2012-01-01

    Full Text Available This paper presents a novel mathematical model for the transmission network expansion planning problem. Main idea is to consider phase-shifter (PS transformers as a new element of the transmission system expansion together with other traditional components such as transmission lines and conventional transformers. In this way, PS are added in order to redistribute active power flows in the system and, consequently, to diminish the total investment costs due to new transmission lines. Proposed mathematical model presents the structure of a mixed-integer nonlinear programming (MINLP problem and is based on the standard DC model. In this paper, there is also applied a specialized genetic algorithm aimed at optimizing the allocation of candidate components in the network. Results obtained from computational simulations carried out with IEEE-24 bus system show an outstanding performance of the proposed methodology and model, indicating the technical viability of using these nonconventional devices during the planning process.

  12. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  13. Ultrasonic testing with the phased array method at the pipe connection inner edges in pipings

    International Nuclear Information System (INIS)

    Brekow, G.; Wuestenberg, H.; Hesselmann, H.; Rathgeb, W.

    1991-01-01

    Ultrasonic testing with the phased array method at the pipe connection inner edges in pipings. The pipe connection inner corner tests in feedwater lines to the main coolant pipe were carried out by Preussen-Elektra in cooperation with Siemens KWU and the BAM with the ultrasonic phased array method. The testing plan was developed by means of a computed model. For a trial of the testing plan, numerous ultrasonic measurements with the phased array method were carried out using a pipe test piece with TH-type inner edges, which was a 1:1 model of the reactor component to be tested. The data measured at several test notches in the pipe connection inner edge area covered by a plating of 6 mm were analyzed. (orig./MM) [de

  14. ALTERNATE REDUCTANT COLD CAP EVALUATION FURNACE PHASE I TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, F.; Miller, D.; Zamecnik, J.; Lambert, D.

    2014-04-22

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further evaluation of this flowsheet eliminated the formic acid1, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP): Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the Cold Cap Evaluation Furnace (CEF) cold cap and vapor space data to the benchmark melter flammability models Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: o Define new cold cap reactions and global kinetic parameters for the melter flammability models o Quantify off-gas surging potential of the feed o Characterize off-gas condensate for complete organic and inorganic carbon species Prior to startup, a number of improvements and modifications were made to the CEF, including addition of cameras, vessel support temperature measurement, and a heating

  15. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  16. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  17. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  18. Phase Change Material Heat Exchanger Life Test

    Science.gov (United States)

    Lillibridge, Sean; Stephan, Ryan

    2009-01-01

    Low Lunar Orbit (LLO) poses unique thermal challenges for the orbiting space craft, particularly regarding the performance of the radiators. The IR environment of the space craft varies drastically from the light side to the dark side of the moon. The result is a situation where a radiator sized for the maximal heat load in the most adverse situation is subject to freezing on the dark side of the orbit. One solution to this problem is to implement Phase Change Material (PCM) Heat Exchangers. PCM Heat Exchangers act as a "thermal capacitor," storing thermal energy when there is too much being produced by the space craft to reject to space, and then feeding that energy back into the thermal loop when conditions are more favorable. Because they do not use an expendable resource, such as the feed water used by sublimators and evaporators, PCM Heat Exchangers are ideal for long duration LLO missions. In order to validate the performance of PCM Heat Exchangers, a life test is being conducted on four n-Pentadecane, carbon filament heat exchangers. Fluid loop performance, repeatability, and measurement of performance degradation over 2500 melt-freeze cycles will be performed.

  19. Alternate Reductant Cold Cap Evaluation Furnace Phase II Testing

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Miller, D. H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-09-03

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further research and development of this flowsheet eliminated the formic acid, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric-glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP): Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the CEF cold cap and vapor space data to the benchmark melter flammability models; Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: Define new cold cap reactions and global kinetic parameters in support of the melter flammability model development; Quantify off-gas surging potential of the feed; Characterize off-gas condensate for complete organic and inorganic carbon species. After charging the CEF with cullet from Phase I CEF testing, the melter was slurry-fed with glycolic flowsheet based SB6-Frit 418 melter feed at 36% waste

  20. Fast Flux Test Facility (FFTF) standby plan

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1997-03-06

    The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan is maintain the condition of the FFTF systems, equipment and personnel to preserve the option for plant restart within three and one-half years of a decision to restart, while continuing deactivation work which is consistent with the standby mode.

  1. Fast Flux Test Facility (FFTF) standby plan

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1997-01-01

    The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy's dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan is maintain the condition of the FFTF systems, equipment and personnel to preserve the option for plant restart within three and one-half years of a decision to restart, while continuing deactivation work which is consistent with the standby mode

  2. Project W-314 Polyurea Special Protective Coating (SPC) Test Plan Chemical Compatibility and Physical Characteristics Testing

    International Nuclear Information System (INIS)

    MAUSER, R.W.

    2001-01-01

    This Test Plan outlines the testing to be done on the Special Protective Coating (SPC) Polyurea which includes: Tank Waste Compatibility, Decontamination Factor Testing, and Adhesion Strength Testing after a sample has been exposed to Radiation

  3. Test Plan for Cask Identification Detector

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-29

    This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.

  4. Development of phased-array ultrasonic testing probe

    International Nuclear Information System (INIS)

    Kawanami, Seiichi; Kurokawa, Masaaki; Taniguchi, Masaru; Tada, Yoshihisa

    2001-01-01

    Phased-array ultrasonic testing was developed for nondestructive evaluation of power plants. Phased-array UT scans and focuses an ultrasonic beam to inspect areas difficult to inspect by conventional UT. We developed a highly sensitive piezoelectric composite, and designed optimized phased-array UT probes. We are applying our phased-array UT to different areas of power plants. (author)

  5. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  6. Titan Montgolfiere Terrestrial Test Bed, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — With the Titan Saturn System Mission, NASA is proposing to send a Montgolfiere balloon to probe the atmosphere of Titan. To better plan this mission and create a...

  7. Titan Montgolfiere Terrestrial Test Bed, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — With the Titan Saturn System Mission, NASA is proposing to send a Montgolfiere balloon to probe the atmosphere of Titan. In order to better plan this mission and...

  8. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  9. Ice condenser testing facility and plans

    International Nuclear Information System (INIS)

    Kannberg, L.D.; Ross, B.A.; Eschbach, E.J.; Ligotke, M.W.

    1987-01-01

    A facility is being constructed to experimentally validate the ICEDF computer code. The code was developed to estimate the extent of fission product retention in the ice compartments of pressurized water reactor ice condenser containment systems during severe accidents. The design and construction of the facility is based on a test design that addresses the validation needs of the code for conditions typical of those expected to occur during severe pressurized water reactor accidents. Detailed facility design has followed completion of a test design (i.e., assembled test cases each involving a different set of aerosol and thermohydraulic flow conditions). The test design was developed with the aid of statistical test design software and was scrutinized for applicability with the aid of ICEDF simulations. The test facility will incorporate a small section of a prototypic ice condenser (e.g., a cross section comprising the equivalent of four 1-ft-diameter ice baskets to their full prototypic height of 48 ft). The development of the test design, the detailed facility design, and the construction progress are described in this paper

  10. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  11. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  12. Reliability Estimation Based Upon Test Plan Results

    National Research Council Canada - National Science Library

    Read, Robert

    1997-01-01

    The report contains a brief summary of aspects of the Maximus reliability point and interval estimation technique as it has been applied to the reliability of a device whose surveillance tests contain...

  13. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-07-21

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the Hanford 100 Areas. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at Hanford.

  14. Test plan for FY-91 alpha CAM evaluation

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This report describes the test plan for evaluating the Merlin Gerin, Inc., Edgar alpha continuous air monitor (CAM) and associated analysis system to be conducted by Idaho National Engineering Laboratory (INEL) for the Department of Energy. INEL has evaluated other commercial alpha CAM systems to detect transuranic contaminants during waste handling and retrieval operations. This test plan outlines experimental methods, sampling methods, sampling and analysis techniques, and equipment needed and safety and quality requirements to test the commercial CAM. 8 refs., 3 figs

  15. Space Weather Action Plan Solar Radio Burst Phase 1 Benchmarks and the Steps to Phase 2

    Science.gov (United States)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Love, J. J.; Pierson, J.

    2017-12-01

    Solar radio bursts, when at the right frequency and when strong enough, can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The benchmark team has developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks, the basis used to derive them, and the limitations of that work. We will also discuss the work that needs to be done to complete the phase 2 benchmarks.

  16. Conceptual plan: Two-Phase Flow Laboratory Program for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Howarth, S.M.

    1993-07-01

    The Salado Two-Phase Flow Laboratory Program was established to address concerns regarding two-phase flow properties and to provide WIPP-specific, geologically consistent experimental data to develop more appropriate correlations for Salado rock to replace those currently used in Performance Assessment models. Researchers in Sandia's Fluid Flow and Transport Department originally identified and emphasized the need for laboratory measurements of Salado threshold pressure and relative permeability. The program expanded to include the measurement of capillary pressure, rock compressibility, porosity, and intrinsic permeability and the assessment of core damage. Sensitivity analyses identified the anhydrite interbed layers as the most likely path for the dissipation of waste-generated gas from waste-storage rooms because of their relatively high permeability. Due to this the program will initially focus on the anhydrite interbed material. The program may expand to include similar rock and flow measurements on other WIPP materials including impure halite, pure halite, and backfill and seal materials. This conceptual plan presents the scope, objectives, and historical documentation of the development of the Salado Two-Phase Flow Program through January 1993. Potential laboratory techniques for assessing core damage and measuring porosity, rock compressibility, capillary and threshold pressure, permeability as a function of stress, and relative permeability are discussed. Details of actual test designs, test procedures, and data analysis are not included in this report, but will be included in the Salado Two-Phase Flow Laboratory Program Test Plan pending the results of experimental and other scoping activities in FY93

  17. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  18. Phased array ultrasound testing on complex geometry

    International Nuclear Information System (INIS)

    Tuan Arif Tuan Mat; Khazali Mohd Zin

    2009-01-01

    Phase array ultrasonic inspection is used to investigate its response to complex welded joints geometry. A 5 MHz probe with 64 linear array elements was employed to scan mild steel T-joint, nozzle and node samples. These samples contain many defects such as cracks, lack of penetration and lack of fusion. Ultrasonic respond is analysed and viewed using the Tomoview software. The results show the actual phase array images on respective types of defect. (author)

  19. HESTIA Phase I Test Results: The Air Revitalization System

    Science.gov (United States)

    Wright, Sarah E.; Hansen, Scott W.

    2016-01-01

    In any human spaceflight mission, a number of Environmental Control & Life Support System (ECLSS) technologies work together to provide the conditions astronauts need to live healthily, productively, and comfortably in space. In a long-duration mission, many of these ECLSS technologies may use materials supplied by In-Situ Resource Utilization (ISRU), introducing more interactions between systems. The Human Exploration Spacecraft Test-bed for Integration & Advancement (HESTIA) Project aims to create a test-bed to evaluate ECLSS and ISRU technologies and how they interact in a high-fidelity, closed-loop, human-rated analog habitat. Air purity and conditioning are essential components within any ECLSS and for HESTIA's first test they were achieved with the Air Revitalization System (ARS) described below. The ARS provided four essential functions to the test-bed chamber: cooling the air, removing humidity from the air, removing trace contaminants, and scrubbing carbon dioxide (CO2) from the air. In this case, the oxygen supply function was provided by ISRU. In the current configuration, the ARS is a collection of different subsystems. A fan circulates the air, while a condensing heat exchanger (CHX) pulls humidity out of the air. A Trace Contaminant Removal System (TCRS) filters the air of potentially harmful contaminants. Lastly, a Reactive Plastic Lithium Hydroxide (RP-LiOH) unit removes CO2 from the breathing air. During the HESTIA Phase I test in September 2015, the ARS and its individual components each functioned as expected, although further analysis is underway. During the Phase I testing and in prior bench-top tests, the energy balance of heat removed by the CHX was not equal to the cooling it received. This indicated possible instrument error and therefore recalibration of the instruments and follow-up testing is planned in 2016 to address the issue. The ARS was tested in conjunction with two other systems: the Human Metabolic Simulator (HMS) and the

  20. Test plan: Potash Core Test. WIPP experimental program borehole plugging

    International Nuclear Information System (INIS)

    Christensen, C.L.

    1979-09-01

    The Potash Core Test will utilize a WIPP emplaced plug to obtain samples of an in-situ cured plug of known mix constituents for bench scale testing. An earlier effort involved recovery at the salt horizon of Plug 217, a 17 year old plug in a potash exploration hole for bond testing, but the lack of particulars in the emplacement precluded significant determination of plug performance

  1. 105-F and DR Phase 1 Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    Curry, L.R.

    1998-06-01

    This SAP presents the rationale and strategy for characterization of specific rooms within the 105-F and 105-DR reactor buildings. Figures 1-1 and 1-2 identify the rooms that are the subject of this SAP. These rooms are to be decontaminated and demolished as an initial step (Phase 1 ) in the Interim Safe Storage process for these reactors. Section 1.0 presents the background and sites history for the reactor buildings and summarizes the data quality objective process, which provides the logical basis for this SAP. Preliminary surveys indicate that little radiochemical contamination is present. Section 2.0 presents the quality assurance project plan, which includes a project management structure, sampling methods and quality control, and oversight of the sampling process. Section 2.2.1 summarizes the sampling methods, reflecting the radiological and chemical sampling designs presented in Tables 1-17 and 1-18. Section 3.0 presents the Field Sampling Plan for Phase 1. The sampling design is broken into two stages. Stage 1 will verify the list of radioactive constituents of concern and generate the isotopic distribution. The objectives of Stage 2 are to estimate the radionuclide inventories of room debris, quantify chemical contamination, and survey room contents for potential salvage or recycle. Table 3-1 presents the sampling activities to be performed in Stage 1. Tables 1-17 and 1-18 identify samples to be collected in Stage 2. Stage 2 will consist primarily of survey data collection, with fixed laboratory samples to be collected in areas showing visible stains. Quality control sampling requirements are presented in Table 3-2

  2. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  3. Aerosol can puncture device operational test plan

    International Nuclear Information System (INIS)

    Leist, K.J.

    1994-01-01

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system's fire/explosion proof characteristics, a study was undertaken to compare the baseline system's design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv

  4. Test plan for tank 241-C-104 retrieval testing

    International Nuclear Information System (INIS)

    HERTING, D.L.

    1999-01-01

    Tank 241-C-104 has been identified as one of the first tanks to be retrieved for high-level waste pretreatment and immobilization. Retrieval of the tank waste will require dilution. Laboratory tests are needed to determine the amount of dilution required for safe retrieval and transfer of feed. The proposed laboratory tests are described in this document

  5. Test Plan for Tank 241-C-104 Retrieval Testing

    International Nuclear Information System (INIS)

    HERTING, D.L.

    1999-01-01

    Tank 241-C-104 has been identified as one of the first tanks to be retrieved for high-level waste pretreatment and immobilization. Retrieval of the tank waste will require dilution. Laboratory tests are needed to determine the amount of dilution required for safe retrieval and transfer of feed. The proposed laboratory tests are described in this document

  6. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  7. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  8. Minnesota urban partnership agreement national evaluation : content analysis test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the content analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing ...

  9. Minnesota urban partnership agreement national evaluation : exogenous factors test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the exogenous factors test plan for the national evaluation of the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reduc...

  10. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  11. Minnesota urban partnership agreement national evaluation : tolling test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the test plan for collecting and analyzing toll data for the Minnesota Urban Partnership : Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The : Minnesota UPA projects focus on reducin...

  12. Minnesota urban partnership agreement national evaluation : telecommuting test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the telecommuting test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing str...

  13. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  14. 78 FR 5165 - First Phase of the Forest Planning Process for the Bio-Region

    Science.gov (United States)

    2013-01-24

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio... initiating the first phase of the forest planning process for the Bio-Region. SUMMARY: Come gather 'round... phase of the Bio-Regional Assessment has begun. DATES: The Bio-Regional Assessment Report will be...

  15. SCTI chemical leak detection test plan

    International Nuclear Information System (INIS)

    1981-01-01

    Tests will be conducted on the CRBRP prototype steam generator at SCTI to determine the effects of steam generator geometry on the response of the CRBRP chemical leak detection system to small water-to-sodium leaks in various regions of the steam generator. Specifically, small injections of hydrogen gas (simulating water leaks) will be made near the two tubesheets, and the effective transport times to the main stream exit and vent line hydrogen meters will be measured. The magnitude and time characteristics of the meters' response will also be measured. This information will be used by the Small Leak Protection Base Program (SG027) for improved predictions of meter response times and leak detection sensitivity

  16. Durability of lightweight concrete : Phase II : wetting and drying tests, Phase III : freezing and thawing tests.

    Science.gov (United States)

    1966-12-01

    This report describes a laboratory research program on the durability of lightweight concrete. Two phases of a three phase study are covered by this report, while the remaining phase is still under study. The two phases being reported are Phase II - ...

  17. Second phase in steel AISI 316 tested at 8000C

    International Nuclear Information System (INIS)

    Silveira, V.L.A.; Monteiro, S.N.

    The nature of second phases in type 316 stainless steel samples tested in creep to rupture at 800 0 C has been discussed. These phases were identified by experimental techniques completed with the available information in the literature. The role of these phases in the creep properties of the type 316 steel at 800 0 C is analysed [pt

  18. Aging of snubbers in nuclear service: Phase I study results and Phase II plans

    International Nuclear Information System (INIS)

    Goodman, R.L.; Bush, S.H.; Page, R.E.

    1988-01-01

    Two major research areas were investigated in the Phase I snubber aging studies. The first area involved a preliminary evaluation of the effects of various aging mechanisms on snubber operation; failure modes of mechanisms were identified and their contributions to aging degradation were assessed relative to other failure modes. The second area involved estimating the efficacy of existing tests and examinations that are intended to determine the effects of aging and degradation. Available data on snubber behavior and operating experience were reviewed, using licensee event reports and other historical data for the 10-year period from 1973 through 1983. Value-impact was considered in terms of (1) exposure of workers to radioactive environments for examination/testing and (2) the cost for expansion of the snubber testing program due to failed snubbers. Results from the Phase I studies identified the need to modify or improve examination and testing procedures to enhance snubber reliability. Based on the results of the Phase I snubber studies, the seals and fluids were identified as the two principal elements affected by aging degradation in hydraulic snubbers. Phase II work, which was initiated in FY 1987, will develop cooperative activities between PNL and operating utilities through the Snubber Utility Group (SNUG), who will work to establish a strong data and experience base for both hydraulic and mechanical snubbers based on actual operating and maintenance history at nuclear power plants. Application guidelines for snubbers will be recommended based on the study results

  19. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  20. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  1. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  2. LS1 Report: testing Plan B

    CERN Multimedia

    Anaïs Schaeffer & Katarina Anthony

    2014-01-01

    A team from the TE Department is currently testing the secondary electrical network for the LHC’s main dipoles – that is, the power circuit used in the event of a quench (loss of superconductivity). This secondary network is essential for the safety of the machine and has been strengthened as part of the SMACC project (see here).   In event of a quench, the current travels via a secondary circuit (in yellow). In order to reach an energy of 6.5 TeV per beam, the LHC will need to be supplied with an electrical current of 11 kA. While the machine’s dozens of kilometres of superconducting cables usually transport the current without any problems (i.e. with no electrical resistance), quenches can sometimes occur as a result of instabilities that cause a loss of superconductivity. In this case, the current travels via a secondary circuit, a short back-up network:  diodes that divert the current if the quench occurs in a magnet and copper bars ...

  3. Test plan for prototype dielectric permittivity sensor

    International Nuclear Information System (INIS)

    Pfeifer, M.C.

    1993-07-01

    The digface characterization project funded by the Buried Waste Integrated Demonstration (BWID) is designed to test a new method of monitoring hazardous conditions during the remediation at waste sites. Often on a large scale, the exact cause of each anomaly is difficult to determine and ambiguities remain in the characterization of a site. The digface characterization concept is designed to alleviate some of this uncertainty by creating systems that monitor small volumes of soil and detect anomalous areas during remediation before they are encountered. The goal of the digface characterization demonstration is to detect changes in the physical properties from one volume to another and relate these changes in physical properties to changes in the level of contamination. Dielectric permittivity mapping is a method that might prove useful in digface characterization. In this project, the role of a dielectric permittivity monitoring device is under investigation. This project addresses two issues: what are the optimal means of mapping dielectric permittivity contrasts and what types of targets can be detected using dielectric permittivity mapping

  4. Standard review plan for the review and evaluation of emergency plans for research and test reactors

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides a Standard Review Plan to assure that complete and uniform reviews are made of research and test reactor radiological emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in American National Standard ANSI/ANS 15.16 - 1982 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady-state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix. The content of the emergency plan is as follows: the emergency plan addresses the necessary provisions for coping with radiological emergencies. Activation of the emergency plan is in response to the emergency action levels. In addition to addressing those severe emergencies that will fall within one of the standard emergency classes, the plan also discusses the necessary provisions to deal with radiological emergencies of lesser severity that can occur within the operations boundary. The emergency plan allows for emergency personnel to deviate from actions described in the plan for unusual or unanticipated conditions

  5. Light phase testing of social behaviors: not a problem

    Directory of Open Access Journals (Sweden)

    Mu Yang

    2008-12-01

    Full Text Available The rich repertoire of mouse social behaviors makes it possible to use mouse models to study neurodevelopmental disorders characterized by social deficits. The fact that mice are naturally nocturnal animals raises a critical question of whether behavioral experiments should be strictly conducted in the dark phase and whether light phase testing is a major methodologically mistake. Although mouse social tasks have been performed in both phases in different laboratories, there seems to be no general consensus on whether testing phase is a critical factor or not. A recent study from our group showed remarkably similar social scores obtained from inbred mice tested in the light and the dark phase, providing evidence that light phase testing could yield reliable results as robust as dark phase testing for the sociability test. Here we offer a comprehensive review on mouse social behaviors measured in light and dark phases and explain why it is reasonable to test laboratory mice in experimental social tasks in the light phase.

  6. HRB-22 irradiation phase test data report

    International Nuclear Information System (INIS)

    Montgomery, F.C.; Acharya, R.T.; Baldwin, C.A.; Rittenhouse, P.L.; Thoms, K.R.; Wallace, R.L.

    1995-03-01

    Irradiation capsule HRB-22 was a test capsule containing advanced Japanese fuel for the High Temperature Test Reactor (HTTR). Its function was to obtain fuel performance data at HTTR operating temperatures in an accelerated irradiation environment. The irradiation was performed in the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL). The capsule was irradiated for 88.8 effective full power days in position RB-3B of the removable beryllium (RB) facility. The maximum fuel compact temperature was maintained at or below the allowable limit of 1300 degrees C for a majority of the irradiation. This report presents the data collected during the irradiation test. Included are test thermocouple and gas flow data, the calculated maximum and volume average temperatures based on the measured graphite temperatures, measured gaseous fission product activity in the purge gas, and associated release rate-to-birth rate (R/B) results. Also included are quality assurance data obtained during the test

  7. Failure-censored accelerated life test sampling plans for Weibull distribution under expected test time constraint

    International Nuclear Information System (INIS)

    Bai, D.S.; Chun, Y.R.; Kim, J.G.

    1995-01-01

    This paper considers the design of life-test sampling plans based on failure-censored accelerated life tests. The lifetime distribution of products is assumed to be Weibull with a scale parameter that is a log linear function of a (possibly transformed) stress. Two levels of stress higher than the use condition stress, high and low, are used. Sampling plans with equal expected test times at high and low test stresses which satisfy the producer's and consumer's risk requirements and minimize the asymptotic variance of the test statistic used to decide lot acceptability are obtained. The properties of the proposed life-test sampling plans are investigated

  8. Integration and test plans for complex manufacturing systems

    NARCIS (Netherlands)

    Boumen, R.

    2007-01-01

    The integration and test phases that are part of the development and manufacturing of complex manufacturing systems are costly and time consuming. As time-to-market is becoming increasingly important, it is crucial to keep these phases as short as possible, whilemaintaining system quality. This is

  9. Fortran Testing and Refactoring Infrastructure, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Tech-X proposes to develop a comprehensive Fortran testing and refactoring infrastructure that allows developers and scientists to leverage the benefits of a...

  10. Fortran Testing and Refactoring Infrastructure, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Tech-X proposes to develop a comprehensive Fortran testing and refactoring infrastructure that allows developers and scientists to leverage the benefits of...

  11. Accelerated testing statistical models, test plans, and data analysis

    CERN Document Server

    Nelson, Wayne B

    2009-01-01

    The Wiley-Interscience Paperback Series consists of selected books that have been made more accessible to consumers in an effort to increase global appeal and general circulation. With these new unabridged softcover volumes, Wiley hopes to extend the lives of these works by making them available to future generations of statisticians, mathematicians, and scientists. "". . . a goldmine of knowledge on accelerated life testing principles and practices . . . one of the very few capable of advancing the science of reliability. It definitely belongs in every bookshelf on engineering.""-Dev G.

  12. In situ vitrification laboratory-scale test work plan

    International Nuclear Information System (INIS)

    Nagata, P.K.; Smith, N.L.

    1991-05-01

    The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs

  13. Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, Revision 2 with ROTC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam [Nevada Test Site (NTS), Mercury, NV (United States)

    2009-07-01

    This Phase II CAIP describes new work needed to potentially reduce uncertainty and achieve increased confidence in modeling results. This work includes data collection and data analysis to refine model assumptions, improve conceptual models of flow and transport in a complex hydrogeologic setting, and reduce parametric and structural uncertainty. The work was prioritized based on the potential to reduce model uncertainty and achieve an acceptable level of confidence in the model predictions for flow and transport, leading to model acceptance by NDEP and completion of the Phase II CAI stage of the UGTA strategy.

  14. Test plan for air monitoring during the Cryogenic Retrieval Demonstration

    International Nuclear Information System (INIS)

    Yokuda, E.

    1992-06-01

    This report presents a test plan for air monitoring during the Cryogenic Retrieval Demonstration (CRD). Air monitors will be used to sample for the tracer elements neodymium, terbium, and ytterbium, and dysprosium. The results from this air monitoring will be used to determine if the CRD is successful in controlling dust and minimizing contamination. Procedures and equipment specifications for the test are included

  15. Mixer pump test plan for double shell tank AZ-101

    International Nuclear Information System (INIS)

    STAEHR, T.W.

    1999-01-01

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151

  16. Experimental Test Plan DOE Tidal and River Reference Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  17. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-10-26

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the 100 Areas at the Hanford Site. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at the Hanford Site.

  18. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  19. Michigan dioxin exposure study: planning phase and protocol development

    Energy Technology Data Exchange (ETDEWEB)

    Adriaens, P. [Univ. of Michigan, Coll. of Engineering, Ann Arbor (United States); Garabrant, D.; Franzblau, A. [Univ. of Michigan, School for Public Health, Ann Arbor (United States); Gillespie, B. [Univ. of Michigan, Center for Statistics, Ann Arbor (United States); Lepowski, J. [Univ. of Michigan, Inst. for Social Research, Ann Arbor (United States)

    2004-09-15

    The University of Michigan has been commissioned to conduct one of the largest environmental epidemiology studies (700 residents) of dioxin exposure among the population of Michigan to describe the pattern of serum dioxin levels among adults and to understand the factors that explain variation in serum dioxin levels. The study is being undertaken (2004-2006) in response to concerns among the population of Midland and Saginaw Counties that dioxins from the Dow Chemical Company facilities in Midland have resulted in contamination of areas of the City of Midland and have contaminated the sediments in the Tittabawassee River flood plain. There is concern that body burdens of dioxins are elevated because of environmental contamination. The appropriate way to respond to these concerns is to measure the serum dioxin levels in a probability sample of the population in the region and to estimate each individual's past exposure to various factors that are believed to contribute to the body burden of dioxins. By measuring factors that reflect potential exposure to dioxins through air, water, soil, food intake, occupations, and various recreational activities, we can identify the factors that correlate with (and explain variation in) serum dioxin levels. The central goal of the study is to determine which factors explain variation in serum dioxin levels, and to quantify how much variation each factor explains. This paper provides information on the planning phase, study scope and objectives.

  20. Phase 1: ISOCELL demonstration test performance review

    International Nuclear Information System (INIS)

    Chatwin, T.D.

    1991-04-01

    This document consolidates and organizes information available concerning cryogenic retrieval of hazardous, radioactive, and mixed wastes and is mainly derived from a report on the ISOCELL Demonstration Project prepared by Concept RKK, Ltd. ISOCELL cryogenic technology is designed to immobilize hazardous, radioactive, and mixed waste by creating a block of frozen waste and soil that can be safely retrieved, stored, transported, and treated with a minimum of dust. A test of the ISOCELL process was conducted in Carnation, Washington by Concept RKK, Ltd. Test conditions were compared to possible testing conditions at Idaho National Engineering Laboratory. Results indicate ISOCELL technology successfully froze wet soil into a soil block capable of being lifted. 5 refs., 6 figs., 1 tab

  1. Statistical analysis and planning of multihundred-watt impact tests

    International Nuclear Information System (INIS)

    Martz, H.F. Jr.; Waterman, M.S.

    1977-10-01

    Modular multihundred-watt (MHW) radioisotope thermoelectric generators (RTG's) are used as a power source for spacecraft. Due to possible environmental contamination by radioactive materials, numerous tests are required to determine and verify the safety of the RTG. There are results available from 27 fueled MHW impact tests regarding hoop failure, fingerprint failure, and fuel failure. Data from the 27 tests are statistically analyzed for relationships that exist between the test design variables and the failure types. Next, these relationships are used to develop a statistical procedure for planning and conducting either future MHW impact tests or similar tests on other RTG fuel sources. Finally, some conclusions are given

  2. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  3. Field test plan: Buried waste technologies, Fiscal Year 1995

    International Nuclear Information System (INIS)

    Heard, R.E.; Hyde, R.A.; Engleman, V.S.; Evans, J.D.; Jackson, T.W.

    1995-06-01

    The US Department of Energy, Office of Technology Development, supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that, when integrated with commercially available baseline technologies, form a comprehensive remediation system for the effective and efficient remediation of buried waste. The Fiscal Year 1995 effort is to deploy and test multiple technologies from four functional areas of buried waste remediation: site characterization, waste characterization, retrieval, and treatment. This document is the basic operational planning document for the deployment and testing of the technologies that support the field testing in Fiscal Year 1995. Discussed in this document are the scope of the tests; purpose and objective of the tests; organization and responsibilities; contingency plans; sequence of activities; sampling and data collection; document control; analytical methods; data reduction, validation, and verification; quality assurance; equipment and instruments; facilities and utilities; health and safety; residuals management; and regulatory management

  4. Mercury flow tests (first report). Wall friction factor measurement tests and future tests plan

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Kinoshita, Hidetaka; Haga, Katsuhiro; Hino, Ryutaro; Sudo, Yukio

    1999-07-01

    In the neutron science project at JAERI, we plan to inject a pulsed proton beam of a maximum power of 5 MW from a high intense proton accelerator into a mercury target in order to produce high energy neutrons of a magnitude of ten times or more than existing facilities. The neutrons produced by the facility will be utilized for advanced field of science such as the life sciences etc. An urgent issue in order to accomplish this project is the establishment of mercury target technology. With this in mind, a mercury experimental loop with the capacity to circulate mercury up to 15 L/min was constructed to perform thermal hydraulic tests, component tests and erosion characteristic tests. A measurement of the wall friction factor was carried out as a first step of the mercury flow tests, while testing the characteristic of components installed in the mercury loop. This report presents an outline of the mercury loop and experimental results of the wall friction factor measurement. From the wall friction factor measurement, it was made clear that the wettability of the mercury was improved with an increase of the loop operation time and at the same time the wall friction factors were increased. The measured wall friction factors were much lower than the values calculated by the Blasius equation at the beginning of the loop operation because of wall slip caused by a non-wetted condition. They agreed well with the values calculated by the Blasius equation within a deviation of 10% when the sum of the operation time increased more than 11 hours. This report also introduces technical problems with a mercury circulation and future tests plan indispensable for the development of the mercury target. (author)

  5. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to

  6. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  7. IFE chamber technology testing program in NIF and chamber development test plan

    International Nuclear Information System (INIS)

    Abdou, M.A.

    1995-01-01

    Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF

  8. Horonobe underground research laboratory project. The plan for the in-situ experiments in Phase 2 and Phase 3 in/around URL

    International Nuclear Information System (INIS)

    Matsui, Hiroya

    2005-09-01

    This report describes for preliminary research plan in Phase 2 and Phase 3 taken into consideration of expected geological environment at location of URL based on the results of the investigations until FY 2003/2004. Duration of construction phase and total cost are considered as important factors for planning as well. The below items are planned for in-situ experiments in Phase 2 and Phase 3 in/around URL are planning. Phase 2. (In-situ experiments for understanding of geological environment) Geological survey at tunnel. Inflow measurement in shafts. Water pressure monitoring and groundwater sampling around shafts during excavation of URL. Investigation for EDZ around shafts. Stress measurement on support. Detail investigations for geological environment around drifts. Excavation disturbance experiment in a drift. Investigation for desaturation zone and REDOX condition around drifts. (Engineered barrier system) In-situ experiment on low-alkali concrete. In-situ experiment for gas migration in engineering barrier system. Phase 3. (In-situ experiments for understanding of geological environment) EDZ experiment for stress interference. Investigation of long-term behavior of EDZ around drifts. Detail investigation on fault/fault zone. Monitoring for the change of geological environment at earthquake. Backfill test in boreholes. (Engineered barrier system) T-H-M-C experiment. In-situ experiment for corrosion of overpack. Investigation of the influence of a concrete to engineering barrier system and geological environment. In-situ experiment for interference between backfill material and geological environment. Backfill test in a drift. (Safety assessment) Tracer tests in engineering barrier system, natural barrier and fault/fault zone. (author)

  9. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Plans for the next phase of CORDEX activities

    Science.gov (United States)

    Giorgi, Filippo; Gutowski, William

    2016-04-01

    Ensembles of Regional Climate Model (RCM) projections have been completed under the protocol of the first phase of the COordinated Regional Downscaling EXperiment (CORDEX, Giorgi et al. 2009) over most CORDEX domains. As a result of these activities a number of scientific issues have emerged, which provide the basis for discussion of the next phase of the CORDEX program. Among such issues are a clearer identification and quantification of the added value of the use of RCMs, the development and use of a new generation of very high resolution (Regional Earth System Models (RESMs), a more detailed and process-based analysis of RCM simulations, the effects of regional forcings (e.g. land use change and aerosols) and a better integration of empirical/statistical downscaling within the CORDEX framework. A large inhomogeneity was also noted across different CORDEX regional efforts, with some domains (e.g. EURO-CORDEX, AFRICA-CORDEX and MED-CORDEX) being covered by large ensembles and others by much more sparse experiment matrices. This has limited the use of CORDEX results in international programs such as the Intergovernmental Panel on Climate Change (IPCC). Two avenues are being discussed in order to address these issues. The first is to produce a homogeneous set of higher resolution projections (10-20 km) across all or most CORDEX domains using a core set of RCMs downscaling a core set of GCMs. The second is to develop and implement a set of "Flagship Pilot Studies (FPSs)" over sub-regions of interest aimed at addressing specific scientific questions (e.g. added value and convection-permitting simulations, intercomparison of different downscaling approaches, land-use and aerosol effects). In this presentation we will describe the status of the discussion and plans for these new CORDEX initiatives, which will be likely finalized at the upcoming third Pan-CORDEX conference (ICRC-CORDEX 2016) to be held in Stockholm on 17-10 May, 2016. Giorgi F, Jones C, Asrar G, 2009

  11. Wind Turbine Drivetrain Condition Monitoring During GRC Phase 1 and Phase 2 Testing

    Energy Technology Data Exchange (ETDEWEB)

    Sheng, S.; Link, H.; LaCava, W.; van Dam, J.; McNiff, B.; Veers, P.; Keller, J.; Butterfield, S.; Oyague, F.

    2011-10-01

    This report will present the wind turbine drivetrain condition monitoring (CM) research conducted under the phase 1 and phase 2 Gearbox Reliability Collaborative (GRC) tests. The rationale and approach for this drivetrain CM research, investigated CM systems, test configuration and results, and a discussion on challenges in wind turbine drivetrain CM and future research and development areas, will be presented.

  12. Depressurisation studies. Phase 2: results of Tests 127 and 128

    International Nuclear Information System (INIS)

    Edwards, A.R.; Borgartz, B.O.; Goodman, R.M.E.; O'Brien, T.P.; Rawlingson, M.

    1978-06-01

    A basic experimental programme involving the sudden depressurisation of a simple pipe system containing water at 3.45 to 17.24MPa pressure and temperature in the range of 200 to 250 0 C has been concluded. Measurements were made of the transient density, pressure, and temperature variations in a two phase fluid in the system during discharge. Phase 1 tests investigated blowdown from straight pipes 4m long with constant internal diameters of 73 and 32 mm. Phase 2 tests incorporated a reservoir added to the 32mm pipe. In this, the second of three reports on Phase 2 tests, the test assembly, instrumentation and experimental procedure are briefly described. The conditions and results are reported for two of the tests in which the liquid in the long discharge pipe was initially subcooled by 10 0 C and 15 0 C while the reservoir was at saturation conditions with a steam dome present. (UK)

  13. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  14. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  15. Hanstholm phase 2B. Offshore wave energy test 1994 - 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The wave power converter consists of a float 2.5 meter in diameter, connected by a rope to a seabed-mounted piston pump, installed on 25 meter deep water 2,5 km offshore Hanstholm, Denmark. The converter is designed to absorb an average maximum power of 1 kW. Measured data in real sea conditions are compared to results based on computer simulations and previous tank testing. Losses caused by rope elasticity and hysteresis, friction in the pump and back flow through the valves are assessed. The economic perspectives of a large wave power plant are presented, based on a revised prototype incorporating the results and experience gained during the test period. The wave energy conversion test `Hanstholm phase 2B` has showed, that it it technically possible to exploit the offshore wave energy resource. This source of energy could become attractive for commercial enterprise. The wave power converter demonstrated a reliable performance over a period of nine months. It produced energy under all wave conditions and survived storm waves of 9,6 m. A 300 MW wave power plant in the Danish part of the North sea is estimated to produce electricity at a cost between 2,1 - 2,4 DKK/kWh. The electrical transmission to shore contribute to approximately 20% of the cost. New data predict a potential of 23 kW per meter wave front. The energy plan Energy 21 proposed by the Danish Department of Energy, includes a scenario incorporating wave energy in the energy system year 2030. A strategy for the development of wave energy, has been proposed as part of the project OWEC-1 supported by the European Joule R and D programme. A proposal for future Danish initiatives to develop second generation point absorber systems is outlined. (ARW) 29 refs.

  16. Nuclear material control and accountancy planning and performance testing

    International Nuclear Information System (INIS)

    Mike Enhinger; Dennis Wilkey; Rod Martin; Ken Byers; Brian Smith

    1999-01-01

    An overview of performance testing as used at U.S. Department of Energy facilities is provided. Performance tests are performed on specific aspects of the regulations or site policy. The key issues in establishing a performance testing program are: identifying what needs to be tested; determining how to test; establishing criteria to evaluate test results. The program elements of performance testing program consist of: planning; coordination; conduct; evaluation. A performance test may be conducted of personnel or equipment. The DOE orders for nuclear material control and accountancy are divided into three functional areas: program administration, material accounting, and material control. Examples performance tests may be conducted on program administration, accounting, measurement and measurement control, inventory, and containment [ru

  17. Testing for significance of phase synchronisation dynamics in the EEG.

    Science.gov (United States)

    Daly, Ian; Sweeney-Reed, Catherine M; Nasuto, Slawomir J

    2013-06-01

    A number of tests exist to check for statistical significance of phase synchronisation within the Electroencephalogram (EEG); however, the majority suffer from a lack of generality and applicability. They may also fail to account for temporal dynamics in the phase synchronisation, regarding synchronisation as a constant state instead of a dynamical process. Therefore, a novel test is developed for identifying the statistical significance of phase synchronisation based upon a combination of work characterising temporal dynamics of multivariate time-series and Markov modelling. We show how this method is better able to assess the significance of phase synchronisation than a range of commonly used significance tests. We also show how the method may be applied to identify and classify significantly different phase synchronisation dynamics in both univariate and multivariate datasets.

  18. 78 FR 8104 - First Phase of the Forest Planning Process for the Bio-Region; Correction

    Science.gov (United States)

    2013-02-05

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio-Region; Correction AGENCY: USDA, Forest Service. ACTION: Notice; correction. SUMMARY: The Department of... rule entitled First Phase of the Forest Planning Process for the Bio-Region. The document contained...

  19. Testing for Sphericity in Phase I Control Chart Applications

    DEFF Research Database (Denmark)

    Windfeldt, Gitte Bjørg; Bisgaard, Søren

    2009-01-01

    , to check this assumption. We supply a graph of the exact percentage points for the distribution of the test statistics. The test statistics can be computed with standard statistical software. Together with the graph of the exact percentage points, the test can easily be performed during a phase I study. We...

  20. Distributed Rocket Engine Testing Health Monitoring System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Leveraging the Phase I achievements of the Distributed Rocket Engine Testing Health Monitoring System (DiRETHMS) including its software toolsets and system building...

  1. Microgravity Multi-Phase Flow Experiment for Suborbital Testing (MFEST)

    Data.gov (United States)

    National Aeronautics and Space Administration — The primary objective is to conduct a pathfinder, suborbital flight experiment for two-phase fluid flow and separator operations.The primary purpose of this test...

  2. Rail flaw sizing using conventional and phased array ultrasonic testing.

    Science.gov (United States)

    2012-12-01

    An approach to detecting and characterizing internal defects in rail through the use of phased array ultrasonic testing has shown the potential to reduce the risk of missed defects and improve transverse defect characterization. : Transportation Tech...

  3. Ontological Models to Support Planning Operations, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  4. Ontological Models to Support Planning Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  5. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  6. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptable for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF

  7. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  8. A nuclear power plant certification test plan and checklist

    International Nuclear Information System (INIS)

    Halverson, S.M.

    1989-01-01

    Regulations within the nuclear industry are requiring that all reference plant simulators be certified prior to or during 1991. A certification test plan is essential to ensure that this goal is met. A description of each step in the certification process is provided in this paper, along with a checklist to help ensure completion of each item

  9. Plan for 3-D full-scale earthquake testing facility

    International Nuclear Information System (INIS)

    Ohtani, K.

    2001-01-01

    Based on the lessons learnt from the Great Hanshin-Awaji Earthquake, National Research Institute for Earth Science and Disaster Prevention plan to construct the 3-D Full-Scale Earthquake Testing Facility. This will be the world's largest and strongest shaking table facility. This paper describes the outline of the project for this facility. This facility will be completed in early 2005. (author)

  10. Setup of a testing environment for mission planning in mining

    NARCIS (Netherlands)

    Groenen, J.P.J.; Steinbuch, M.

    2013-01-01

    Mission planning algorithms for surface mining applications are difficult to test as a result of the large scale tasks. To validate these algorithms, a scaled setup is created where the mining excavator is mimicked by an industrial robot. This report discusses the development of a software

  11. In situ gas treatment technology demonstration test plan

    International Nuclear Information System (INIS)

    Thornton, E.C.; Miller, R.D.

    1996-01-01

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities

  12. Phase 2 testing of ENDF/B-VI shielding data

    International Nuclear Information System (INIS)

    Ingersoll, D.T.; Wright, R.Q.; Slater, C.O.

    1992-01-01

    Version 6 of the US Evaluated Nuclear Data File (ENDF/B-VI) was released in early 1990 and is currently undergoing phase 2 testing. In Phase 2 testing, the evaluated data are approximately processed and used in an integral manner to predict the solution of previously specified benchmark experiments. Results are presented for the initial testing of several light elements and structural materials which are important for shielding applications. These initial tests indicate that the relatively subtle changes made to the iron data and the major modernization of the boron-11 data in Version 6 both represent significant and positive advancements in the quality of the evaluated data files

  13. Hanford Site physical separations CERCLA treatability test plan

    International Nuclear Information System (INIS)

    1992-03-01

    This test plan describes specifications, responsibilities, and general procedures to be followed to conduct a physical separations soil treatability test in the North Process Pond of the 300-FF-1 Operable Unit at the Hanford Site, Washington. The objective of this test is to evaluate the use of physical separation systems as a means of concentrating chemical and radioactive contaminants into fine soil fractions and thereby minimizing waste volumes. If successful the technology could be applied to clean up millions of cubic meters of contaminated soils in waste sites at Hanford and other sites. It is not the intent of this test to remove contaminated materials from the fine soils. Physical separation is a simple and comparatively low cost technology to potentially achieve a significant reduction in the volume of contaminated soils. Organic contaminants are expected to be insignificant for the 300-FF-I Operable Unit test, and further removal of metals and radioactive contaminants from the fine fraction of soils will require secondary treatment such as chemical extraction, electromagnetic separation, or other technologies. Additional investigations/testing are recommended to assess the economic and technical feasibility of applying secondary treatment technologies, but are not within the scope of this test. This plan provides guidance and specifications for the treatability test to be conducted as a service contract. More detailed instructions and procedures will be provided as part of the vendors (sellers) proposal. The procedures will be approved by Westinghouse Hanford Company (Westinghouse Hanford) and finalized by the seller prior to initiating the test

  14. Safety demonstration test (SR-1/S1C-1) plan of HTTR (Contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Nakagawa, Shigeaki; Sakaba, Nariaki; Takada, Eiji; Tachibana, Yukio; Saito, Kenji; Furusawa, Takayuki; Sawa, Kazuhiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2003-03-01

    Safety demonstration tests in the HTTR (High Temperature Engineering Test Reactor) will be carried out in order to verify inherent safety features of the HTGR (High Temperature Gas-cooled Reactor). The first phase of the safety demonstration tests includes the reactivity insertion test by the control rod withdrawal and the coolant flow reduction test by the circulator trip. In the second phase, accident simulation tests will be conducted. By comparison of their experimental and analytical results, the prediction capability of the safety evaluation codes such as the core and the plant dynamics codes will be improved and verified, which will contribute to establish the safety design and the safety evaluation technologies of the HTGRs. The results obtained through its safety demonstration tests will be also utilised for the establishment of the safety design guideline, the safety evaluation guideline, etc. This paper describes the test program of the overall safety demonstration tests and the test method, the test conditions and the results of the pre-test analysis of the reactivity insertion test and the partial gas circulator trip test planned in March 2003. (author)

  15. Plan for metal barrier selection and testing for NNWSI

    International Nuclear Information System (INIS)

    Halsey, W.G.; McCright, R.D.

    1987-12-01

    The Department of Energy's Nevada Nuclear Waste Storage Investigations (NNWSI) Project is evaluating a site at Yucca Mountain in Nevada as a geological repository for the storage of high-level nuclear waste. The Nuclear Waste Management Projects (NWMP) at Lawrence Livermore National Laboratory (LLNL) has the responsibility for design, testing, and performance analysis of the NNWSI waste packages. One portion of this work is the selection and testing of the material for container construction. The anticipated container design is for this material to be a corrosion resistant metal called the metal barrier. This document is the publication version of the Scientific Investigation Plan (SIP) for the Metal Barrier Selection and Testing Task. The SIP serves as a formal planning document for the investigation and is used to assign quality assurance levels to the activities of the task. This document is an informal version for information distribution and has the sections on ''Schedule and Milestones'' and the ''Quality Assurance Level Assignment Sheets'' removed

  16. Hepatic arterial phase and portal venous phase computed tomography for dose calculation of stereotactic body radiation therapy plans in liver cancer: a dosimetric comparison study

    International Nuclear Information System (INIS)

    Xiao, Jianghong; Li, Yan; Jiang, Qingfeng; Sun, Lan; Henderson Jr, Fraser; Wang, Yongsheng; Jiang, Xiaoqin; Li, Guangjun; Chen, Nianyong

    2013-01-01

    To investigate the effect of computed tomography (CT) using hepatic arterial phase (HAP) and portal venous phase (PVP) contrast on dose calculation of stereotactic body radiation therapy (SBRT) for liver cancer. Twenty-one patients with liver cancer were studied. HAP, PVP and non-enhanced CTs were performed on subjects scanned in identical positions under active breathing control (ABC). SBRT plans were generated using seven-field three-dimensional conformal radiotherapy (7 F-3D-CRT), seven-field intensity-modulated radiotherapy (7 F-IMRT) and single-arc volumetric modulated arc therapy (VMAT) based on the PVP CT. Plans were copied to the HAP and non-enhanced CTs. Radiation doses calculated from the three phases of CTs were compared with respect to the planning target volume (PTV) and the organs at risk (OAR) using the Friedman test and the Wilcoxon signed ranks test. SBRT plans calculated from either PVP or HAP CT, including 3D-CRT, IMRT and VMAT plans, demonstrated significantly lower (p <0.05) minimum absorbed doses covering 98%, 95%, 50% and 2% of PTV (D98%, D95%, D50% and D2%) than those calculated from non-enhanced CT. The mean differences between PVP or HAP CT and non-enhanced CT were less than 2% and 1% respectively. All mean dose differences between the three phases of CTs for OARs were less than 2%. Our data indicate that though the differences in dose calculation between contrast phases are not clinically relevant, dose underestimation (IE, delivery of higher-than-intended doses) resulting from CT using PVP contrast is larger than that resulting from CT using HAP contrast when compared against doses based upon non-contrast CT in SBRT treatment of liver cancer using VMAT, IMRT or 3D-CRT

  17. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  18. Aboveground Injection Sytem Construction and Mecahnical Integrity Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    An In-Situ Bioremediation (ISB) Pilot Test Treatability Study is planned at Sandia National Laboratories, New Mexico (SNL/NM) Technical Area-V (TA-V) Groundwater Area of Concern. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater using an injection well. The constituents of concern (COCs) are nitrate and trichloroethene (TCE). The Pilot Test Treatability Study will evaluate the effectiveness of bioremediation and COC treatment over a prescribed period of time. Results of the pilot test will provide data that will be used to evaluate the cost and effectiveness of a fullscale system.

  19. C-018H LERF filtration test plan. Revision 1

    International Nuclear Information System (INIS)

    Moberg, T.P.; King, C.V.

    1994-01-01

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system's ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF

  20. C-018H LERF filtration test plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Moberg, T.P.; King, C.V.

    1994-08-26

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system`s ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF.

  1. ISP42 (PANDA Tests) - Open Phase Comparison Report

    International Nuclear Information System (INIS)

    2003-05-01

    PANDA is a large-scale facility, which has been constructed at the Paul Scherrer Institute (PSI) for the investigation of both overall dynamic response and the key phenomena of passive containment systems during the long-term heat removal phase for Advanced Light Water Reactors (ALWRs). Using a modular concept with a basic set of cylindrical vessels and connecting piping, the facility can be adapted to simulate different passive containment designs. Following a proposal, the OECD/NEA Committee on the Safety of Nuclear Installations approved, at its meeting on December 3-5, 1997, a new International Standard Problem (ISP) involving a test in the PANDA facility, based on a recommendation from the Principal Working Group 2 (PWG2) on System Behaviour. The main interest for this ISP is code validation in relation to a range of LWR and advanced LWR (ALWR) (mainly) containment issues that have been designated as important and involving thermalhydraulic phenomena. The ISP-PANDA test for defined six phases (A to F) was performed on 21/22 April 1998. Since the first part of ISP-42 was going to be conducted as a 'double- blind' or 'blind' exercise, the experimental data was locked. The 'blind' phase calculational results compared to experimental data are presented in the report entitled 'ISP-42 (PANDA Tests ) Blind Phase Comparison'. In the second part, the 'open' exercise has been conducted by providing the ISP-42 PANDA test data to the participants and by performing post-test analysis. The results of the 'open' phase are presented in the present report. 'Open' phase submissions, comparisons, and analyses for ISP-42 are based on the outcome of the results presented in the 'blind' phase report of ISP-42. The experimental data was distributed to all ISP-42 participants for their post-test calculations, 20 June 2000. 'Open' phase analyses of some of the ISP-42 participants, were completely received by the end of January 2001. There were 27 new submissions for different phases

  2. Fumigant Management Plan Templates - Phase 2 Files Listed by Chemical

    Science.gov (United States)

    FMP templates are in PDF and Word formats for each type of soil fumigant pesticide, with samples of filled out plans. Types are by active ingredient chemical: Chloropicrin, dazomet, dimethyl disulfide, metam sodium/potassium, and methyl bromide.

  3. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  4. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  5. INEL test plan for evaluating waste assay systems

    International Nuclear Information System (INIS)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP

  6. Canister disposition plan for the DWPF Startup Test Program

    International Nuclear Information System (INIS)

    Harbour, J.R.; Payne, C.H.

    1990-01-01

    This report details the disposition of canisters and the canistered waste forms produced during the DWPF Startup Test Program. The six melter campaigns (DWPF Startup Tests FA-13, WP-14, WP-15, WP-16, WP-17, and FA-18) will produce 126 canistered waste forms. In addition, up to 20 additional canistered waste forms may be produced from glass poured during the transition between campaigns. In particular, this canister disposition plan (1) assigns (by alpha-numeric code) a specific canister to each location in the six campaign sequences, (2) describes the method of access for glass sampling on each canistered waste form, (3) describes the nature of the specific tests which will be carried out, (4) details which tests will be carried out on each canistered waste form, (5) provides the sequence of these tests for each canistered waste form, and (6) assigns a storage location for each canistered waste form. The tests are designed to provide evidence, as detailed in the Waste Form Compliance Plan (WCP 1 ), that the DWPF product will comply with the Waste Acceptance Product Specifications (WAPS 2 ). The WAPS must be met before the canistered waste form is accepted by DOE for ultimate disposal at the Federal Repository. The results of these tests will be included in the Waste Form Qualification Report (WQR)

  7. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  8. An Overview of the NASA Aeronautics Test Program Strategic Plan

    Science.gov (United States)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  9. Round-Robin Test of Paraffin Phase-Change Material

    Science.gov (United States)

    Vidi, S.; Mehling, H.; Hemberger, F.; Haussmann, Th.; Laube, A.

    2015-11-01

    A round-robin test between three institutes was performed on a paraffin phase-change material (PCM) in the context of the German quality association for phase-change materials. The aim of the quality association is to define quality and test specifications for PCMs and to award certificates for successfully tested materials. To ensure the reproducibility and comparability of the measurements performed at different institutes using different measuring methods, a round-robin test was performed. The sample was unknown. The four methods used by the three participating institutes in the round-robin test were differential scanning calorimetry, Calvet calorimetry and three-layer calorimetry. Additionally, T-history measurements were made. The aim of the measurements was the determination of the enthalpy as a function of temperature. The results achieved following defined test specifications are in excellent agreement.

  10. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  11. Test plan for K-Basin fuel handling tools

    International Nuclear Information System (INIS)

    Bridges, A.E.

    1995-01-01

    The purpose of this document is to provide the test plan and procedures for the acceptance testing of the handling tools enveloped for the removal of an N-Reactor fuel element from its storage canister in the K-Basins storage pool and insertion into the Single fuel Element Can for subsequent shipment to a Hot Cell for examination. Examination of these N-Reactor fuel elements is part of the overall characterization effort. New hand tools were required since previous fuel movement has involved grasping the fuel in a horizontal position. The 305 Building Cold Test Facility will be used to conduct the acceptance testing of the Fuel Handling Tools. Upon completion of this acceptance testing and any subsequent training of operators, the tools will be transferred to the 105 KW Basin for installation and use

  12. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  13. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    Science.gov (United States)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  14. Multilayer Pressure Vessel Materials Testing and Analysis Phase 2

    Science.gov (United States)

    Popelar, Carl F.; Cardinal, Joseph W.

    2014-01-01

    To provide NASA with a suite of materials strength, fracture toughness and crack growth rate test results for use in remaining life calculations for the vessels described above, Southwest Research Institute® (SwRI®) was contracted in two phases to obtain relevant material property data from a representative vessel. An initial characterization of the strength, fracture and fatigue crack growth properties was performed in Phase 1. Based on the results and recommendations of Phase 1, a more extensive material property characterization effort was developed in this Phase 2 effort. This Phase 2 characterization included additional strength, fracture and fatigue crack growth of the multilayer vessel and head materials. In addition, some more limited characterization of the welds and heat affected zones (HAZs) were performed. This report

  15. Specification and acceptance testing of radiotherapy treatment planning systems

    International Nuclear Information System (INIS)

    2007-04-01

    Quality assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. The computerized radiotherapy treatment planning systems (RTPSs) are now widely available in industrialized and developing countries and it is of special importance to support hospitals in Member States in developing procedures for acceptance testing, commissioning and QA of their RTPSs. Responding to these needs, a group of experts developed an IAEA publication with such recommendations, which was published in 2004 as IAEA Technical Reports Series No. 430. This report provides a general framework and describes a large number of tests and procedures that should be considered by the users of new RTPSs. However, small hospitals with limited resources or large hospitals with high patient load and limited staff are not always able to perform complete characterization, validation and software testing of algorithms used in RTPSs. Therefore, the IAEA proposed more specific guidelines that provide a step-by-step recommendation for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for newly purchased RTPSs. The current publication was developed in the framework of the Coordinated Research Project on Development of Procedures for Quality Assurance for Dosimetry Calculations in Radiotherapy and uses the International Electrotechnical Commission (IEC) standard IEC 62083, Requirements for the Safety of Radiotherapy Treatment Planning Systems as its basis. The report addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and users at the hospitals. Recommendations are provided for specific tests to be performed at the manufacturing facility known as type tests, and for acceptance tests to be performed at the hospital known as site tests. The purpose of acceptance testing is to demonstrate to the

  16. Acceptance test plan for the Waste Information Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  17. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  18. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  19. Field testing plan for unsaturated zone monitoring and field studies

    International Nuclear Information System (INIS)

    Young, M.H.; Wierenga, P.J.; Warrick, A.W.

    1996-10-01

    The University of Arizona, in cooperation with the Bureau of Economic Geology at The University of Texas at Austin, and Stephens and Associates in Albuquerque, New Mexico has developed a field testing plan for evaluating subsurface monitoring systems. The U.S. Nuclear Regulatory Commission has requested development of these testing plans for low-level radioactive waste disposal sites (LLW) and for monitoring at decommissioned facilities designated under the open-quotes Site Decommissioning Management Planclose quotes (SDMP). The tests are conducted on a 50 m by 50 m plot on the University of Arizona's Maricopa Agricultural Center. Within the 50 m by 50 m plot one finds: (1) an instrumented buried trench, (2) monitoring islands similar to those proposed for the Ward Valley, California LLW Facility, (3) deep borehole monitoring sites, (4) gaseous transport monitoring, and (5) locations for testing non-invasive geophysical measurement techniques. The various subplot areas are instrumented with commercially available instruments such as neutron probes, time domain reflectometry probes, tensiometers, psychrometers, heat dissipation sensors, thermocouples, solution samplers, and cross-hole geophysics electrodes. Measurement depths vary from ground surface to 15 m. The data from the controlled flow and transport experiments, conducted over the plot, will be used to develop an integrated approach to long-term monitoring of the vadose zone at waste disposal sites. The data will also be used to test field-scale flow and transport models. This report describes in detail the design of the experiment and the methodology proposed for evaluating the data

  20. Test plan for core sampling drill bit temperature monitor

    International Nuclear Information System (INIS)

    Francis, P.M.

    1994-01-01

    At WHC, one of the functions of the Tank Waste Remediation System division is sampling waste tanks to characterize their contents. The push-mode core sampling truck is currently used to take samples of liquid and sludge. Sampling of tanks containing hard salt cake is to be performed with the rotary-mode core sampling system, consisting of the core sample truck, mobile exhauster unit, and ancillary subsystems. When drilling through the salt cake material, friction and heat can be generated in the drill bit. Based upon tank safety reviews, it has been determined that the drill bit temperature must not exceed 180 C, due to the potential reactivity of tank contents at this temperature. Consequently, a drill bit temperature limit of 150 C was established for operation of the core sample truck to have an adequate margin of safety. Unpredictable factors, such as localized heating, cause this buffer to be so great. The most desirable safeguard against exceeding this threshold is bit temperature monitoring . This document describes the recommended plan for testing the prototype of a drill bit temperature monitor developed for core sampling by Sandia National Labs. The device will be tested at their facilities. This test plan documents the tests that Westinghouse Hanford Company considers necessary for effective testing of the system

  1. Test plan for FY-94 digface characterization field experiments

    International Nuclear Information System (INIS)

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL's Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal

  2. Improvement of ultrasonic testing by use of phased arrays

    International Nuclear Information System (INIS)

    Gebhardt, W; Bonitz, F.; Woll, H.

    1983-01-01

    The paper examines the applicability of phased-array technology in non-destructive material testing for quality control, basic inspection and in-service inspections of the primary containment of nuclear power plants. Initial experiments on sonic aigrette control, defect margin reconstruction and the classification of defects have been carried out using medical equipment as commercially available which had been modified for non-destructive applications. At the same time, a for more flexible microcomputer-controlled phased-array system was developed, particularly designed for material testing. (orig./RW) [de

  3. First test results for an adjustable phase undulator

    International Nuclear Information System (INIS)

    Carr, R.; Nuhn, H.D.; Corbett, J.

    1992-01-01

    An Adjustable Phase Undulator (APU) was installed and tested on the beamline 5 of the SPEAR storage ring. The APU has the same magnetic structure as a conventional adjustable gap undulator (AGU), but its magnetic field is varied by changing the longitudinal position between the rows of magnets, while keeping the gap between them fixed. The tests described here show that this undulator performs according to theoretical predictions and numerical models. The main reason to consider a phase adjustable design is the substantial reduction in size, complexity, and cost over comparable conventional designs. (author) 4 refs.; 3 figs

  4. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  5. Palestinian-Israeli Scenario Planning - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    As currently foreseen, neither the two-state nor the one-state solution offers much hope of resolving the Israeli-Palestinian conflict. The Scenario Planning Program of the Strategic Assessments Initiative (SAI) aims to launch a deeper examination of what a sustainable solution requires by shifting the debate from the ...

  6. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  7. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  8. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  9. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described

  10. How Does This All End? Campaign Planning, Phase Transitions, and Conflict Termination in Iraq

    National Research Council Canada - National Science Library

    Goss, Thomas

    2008-01-01

    .... The political issue of how OIF ends is inherently wrapped up in the military issues of campaign planning, desired end-states, centers of gravity, and operational phase transitions in the Iraqi War...

  11. A Robust Flare Planning Logic for Unmanned Aerial Vehicle Applications, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences proposes to develop a flare planning logic that would provide aircraft guidance during this critical phase of flight. The algorithms that...

  12. The Evolution of Phase Zero Shaping and Interagency Integration in Combatant Commander Campaign Planning

    National Research Council Canada - National Science Library

    Chatham, Anthony P

    2007-01-01

    Shaping is an evolving concept. Although it has been added to campaign planning as described in the campaign phasing model, the doctrine fails to adequately define shaping as a distinct category of activities...

  13. A Robust Flare Planning Logic for Unmanned Aerial Vehicle Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences proposes to develop a flare planning methodology that would provide aircraft guidance during this critical phase of flight. The algorithms...

  14. Addendum to ''Test Plan: Small-Scale Seal Performance Tests (SSSPT)''

    International Nuclear Information System (INIS)

    Finley, R.E.

    1992-01-01

    This document describes activities that are intended to update the data base of fluid flow measurements made on expansive salt concrete (ESC) seals as part of the Small-Scale Seal Performance Tests (SSSPT). The original plans for the SSSPT experiments are described by Stormont (1985a and 1985b). These seals have previously been tested with brine and gas during the early stages (less than 450 days) after emplacement. The purpose of this Test Plan Addendum is to detail the activities necessary to, update the gas and brine measurements previously performed on the SSSPT Series A and Series B seals and to identify the key personnel responsible for implementing these activities. This addendum describes a limited undertaking and does NOT change the scope of the original test plan

  15. Boundary Layer Study. Experimental Validation Test Plan. Phase 4

    Science.gov (United States)

    1990-11-01

    are referred to as two-dimensional or divergent losses•), Theoretically, these losses are evaluated from the difference between the ODK (One-Dimensional...traveling with the flow; and 2) those who directly measure the Doppler Shift related to tlhe collective molecular motion. Laser Doppler Anemometry...scattered by the tracer particles at this point is collected and iransmittcd to the spectrometer. The Doppler shift In terms of the relative

  16. Pipe Overpack Container Fire Testing: Phase I II & III.

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, Victor G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ammerman, Douglas J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lopez, Carlos [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gill, Walter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016 were done in three phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. The goal of the third phase was to see if surrogate aerosol gets released from the PC when the drum lid is off. This report will describe the various tests conducted in phase I, II, and III, present preliminary results from these tests, and discuss implications for the POCs.

  17. CISO's guide to penetration testing a framework to plan, manage, and maximize benefits

    CERN Document Server

    Tiller, James S

    2011-01-01

    CISO's Guide to Penetration Testing: A Framework to Plan, Manage, and Maximize Benefits details the methodologies, framework, and unwritten conventions penetration tests should cover to provide the most value to your organization and your customers. Discussing the process from both a consultative and technical perspective, it provides an overview of the common tools and exploits used by attackers along with the rationale for why they are used. From the first meeting to accepting the deliverables and knowing what to do with the results, James Tiller explains what to expect from all phases of th

  18. NNWSI Phase II materials interaction test procedure and preliminary results

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1985-01-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) project is investigating the volcanic tuff beds of Yucca Mountain, Nevada, as a potential location for a high-level radioactive waste repository. This report describes a test method (Phase II) that has been developed to measure the release of radionuclides from the waste package under simulated repository conditions, and provides information on materials interactions that may occur in the repository. The results of 13 weeks of testing using the method are presented, and an analog test is described that investigates the relationship between the test method and expected repository conditions. 9 references, 10 figures, 11 tables

  19. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Environmental Monitoring Plan applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this Environmental Monitoring Plan brings together in one document a description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA). The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  20. Reliability demonstration test planning: A three dimensional consideration

    International Nuclear Information System (INIS)

    Yadav, Om Prakash; Singh, Nanua; Goel, Parveen S.

    2006-01-01

    Increasing customer demand for reliability, fierce market competition on time-to-market and cost, and highly reliable products are making reliability testing more challenging task. This paper presents a systematic approach for identifying critical elements (subsystems and components) of the system and deciding the types of test to be performed to demonstrate reliability. It decomposes the system into three dimensions (i.e. physical, functional and time) and identifies critical elements in the design by allocating system level reliability to each candidate. The decomposition of system level reliability is achieved by using criticality index. The numerical value of criticality index for each candidate is derived based on the information available from failure mode and effects analysis (FMEA) document or warranty data from a prior system. It makes use of this information to develop reliability demonstration test plan for the identified (critical) failure mechanisms and physical elements. It also highlights the benefits of using prior information in order to locate critical spots in the design and in subsequent development of test plans. A case example is presented to demonstrate the proposed approach

  1. Sustainable land use planning at the Semipalatinsk Nuclear Test Site

    International Nuclear Information System (INIS)

    Coughtrey, P.J.; Ridgway, R.B.; Baumann, P.

    2001-01-01

    Full text: The UK Department for International Development (DFID) has recently agreed to support a project to develop a participatory sustainable land use plan for areas affected by nuclear weapons testing at Semipalatinsk. This three year project is expected to be initiated in April 2001 and will form one component of the United Nations Development Programme (UNDP) Semipalatinsk Rehabilitation Programme. The project will be undertaken by a combination of Kazakh organizations working with UK consultants and will meet its overall aim through the following main activities: Development of institutional capacity in data management and analysis; Provision of information and education on environmental contamination, hazards and risks; Development of a participatory land use planning process and piloting of the process in specific areas and communities around the test site; Integration of mineral resource extraction in the land planning process with a focus- on water resource and environmental protection and participatory approaches to resolving land use conflicts; Development of legislative tools to permit the implementation of environmental management of resource exploitation. The project will make use of both modern satellite-based imagery and more traditional methods to determine the potential for different land uses within the test site. The results obtained will be incorporated with additional information on land use. radiological and hydrological conditions at the test site through a geographical information system (GIS) provided by the project. The GIS will form the core component for collation and distribution of information on options available for use of different areas of the test site and its vicinity. A participatory rural appraisal, using tried and tested techniques, will identify local interest groups in land use planning and identify the details of their stake in the process. The groups will include owners-herders, employee-herders, and subsistence

  2. Phase 1 space fission propulsion system testing and development progress

    International Nuclear Information System (INIS)

    Van Dyke, Melissa; Houts, Mike; Godfroy, Tom; Dickens, Ricky; Poston, David; Kapernick, Rick; Reid, Bob; Salvail, Pat; Ring, Peter

    2002-01-01

    Successful development of space fission systems requires an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. If the system is designed to operate within established radiation damage and fuel burn up limits while simultaneously being designed to allow close simulation of heat from fission using resistance heaters, high confidence in fission system performance and lifetime can be attained through a series of non-nuclear tests. The Safe Affordable Fission Engine (SAFE) test series, whose ultimate goal is the demonstration of a 300 kW flight configuration system, has demonstrated that realistic testing can be performed using non-nuclear methods. This test series, carried out in collaboration with other NASA centers, other government agencies, industry, and universities, successfully completed a testing program with a 30 kWt core. Stirling engine, and ion engine configuration. Additionally, a 100 kWt core is in fabrication and appropriate test facilities are being reconfigured. This paper describes the current SAFE non-nuclear tests, which includes test article descriptions, test results and conclusions, and future test plans

  3. Multilayer Pressure Vessel Materials Testing and Analysis. Phase 1

    Science.gov (United States)

    Cardinal, Joseph W.; Popelar, Carl F.; Page, Richard A.

    2014-01-01

    To provide NASA a comprehensive suite of materials strength, fracture toughness and crack growth rate test results for use in remaining life calculations for aging multilayer pressure vessels, Southwest Research Institute (R) (SwRI) was contracted in two phases to obtain relevant material property data from a representative vessel. This report describes Phase 1 of this effort which includes a preliminary material property assessment as well as a fractographic, fracture mechanics and fatigue crack growth analyses of an induced flaw in the outer shell of a representative multilayer vessel that was subjected to cyclic pressure test. SwRI performed this Phase 1 effort under contract to the Digital Wave Corporation in support of their contract to Jacobs ATOM for the NASA Ames Research Center.

  4. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  5. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Operational Area Monitoring Plan for environmental monitoring, is for EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) which operates several offsite facilities in support of activities at the Nevada Test Site (NTS). These facilities include: (1) Amador Valley Operations (AVO), Pleasanton, California; (2) Kirtland Operations (KO), Kirtland Air Force base, Albuquerque, New Mexico (KAFB); (3) Las Vegas Area Operations (LVAO), Remote Sensing Laboratory (RSL), and North Las Vegas (NLV) Complex at Nellis Air Force Base (NAFB), North Las Vegas, Nevada; (4) Los Alamos Operations (LAO), Los Alamos, New Mexico; (5) Santa Barbara Operations (SBO), Goleta, California; (6) Special Technologies Laboratory (STL), Santa Barbara, California; (7) Washington Aerial Measurements Department (WAMD), Andrews Air Force Base, Maryland; and, (8) Woburn Cathode Ray Tube Operations (WCO), Woburn, Massachusetts. Each of these facilities has an individual Operational Area Monitoring Plan, but they have been consolidated herein to reduce redundancy

  6. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    International Nuclear Information System (INIS)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers

  7. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

  8. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2018-04-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  9. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    Science.gov (United States)

    Meer, David W.; Oriti, Salvatore M.

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, GRC has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  10. New JMTR irradiation test plan on fuels and materials

    International Nuclear Information System (INIS)

    Nakamura, Takehiko; Nishiyama, Yutaka; Chimi, Yasuhiro; Sasajima, Hideo; Ogiyanagi, Jin; Nakamura, Jinichi; Suzuki, Masahide; Kawamura, Hiroshi

    2009-01-01

    In order to maintain and enhance safety of light water reactors (LWRs) in long-term and up-graded operations, proper understanding of irradiation behavior of fuels and materials is essentially important. Japanese government and the Japan Atomic Energy Agency (JAEA) have decided to refurbish the Japan Materials Testing Reactor (JMTR) and to install new tests rigs, in order to play an active role for solving irradiation related issues on plant aging and high-duty uses of the current LWRs and on development of next-generation reactors. New tests on fuel integrity under simulated abnormal transients and high-duty irradiation conditions are planned in the JMTR. Power ramp tests of newdesign fuel rods will also be performed in the first stage of the program, which is expected to start in year 2011 after refurbishment of the JMTR. Combination of the JMTR tests with simulated reactivity initiated accident tests in the Nuclear Safety Research Reactor (NSRR) and loss of coolant accident tests in hot laboratories would serve as the integrated fuel safety research on the high performance fuels at extended burnups, covering from the normal to the accident conditions, including abnormal transients. For the materials irradiation, fracture toughness of reactor vessel steels and stress corrosion cracking behavior of stainless steels are being studied in addition to basic irradiation behavior of nuclear materials such as hafnium. The irradiation studies would contribute not only to solve the current problems but also to identify possible seeds of troubles and to make proactive responses. (author)

  11. Summary of ROSA-4 LSTF first phase test program and station blackout (TMLB) test results

    International Nuclear Information System (INIS)

    Tasaka, K.; Kukita, Y.; Anoda, Y.

    1990-01-01

    This paper summarizes major test results obtained at the ROSA-4 Large Scale Test Facility (LSTF) during the first phase of the test program. The results from a station blackout (TMLB) test conducted at the end of the first-phase program are described in some detail. The LSTF is an integral test facility being operated by the Japan Atomic Energy Research Institute for simulation of pressurized water reactor (PWR) thermal-hydraulic responses during small-break loss-of-coolant accidents (SBLOCAs) and operational/abnormal transients. It is a 1/48 volumetrically scaled, full-height, full-pressure simulator of a Westinghouse-type 4-loop PWR. The facility includes two symmetric primary loops each one containing an active inverted-U tube steam generator and an active reactor coolant pump. The loop horizontal legs are sized to conserve the scaled (1/24) volumes as well as the length to the square root of the diameter ratio in order to simulate the two-phase flow regime transitions. The primary objective of the LSTF first-phase program was to define the fundamental PWR thermal-hydraulic responses during SBLOCAs and transients. Most of the tests were conducted with simulated component/operator failures, including unavailability of the high pressure injection system and auxiliary feedwater system, as well as operator failure to take corrective actions. The forty-two first phase tests included twenty-nine SBLOCA tests conducted mainly for cold leg breaks, three abnormal transient tests and ten natural circulation tests. Attempts were made in several of the SBLOCA tests to simulate the plant recovery procedures as well as candidate accident management measures for prevention of high-pressure core melt situation. The natural circulation tests simulated the single-phase and two-phase natural circulation as well as reflux condensation behavior in the primary loops in steady or quasi-steady states

  12. Pipe Overpack Container Fire Testing: Phase I & II

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, Victor G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ammerman, Douglas J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lopez, Carlos [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gill, Walter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a new series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016, and described herein, were done in two phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. This report will describe the various tests conducted in phase I and II, present preliminary results from these tests, and discuss implications for the POCs.

  13. The 3rd irradiation test plan of DUPIC fuel

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Myung Seung; Song, K. C.; Park, J. H. and others

    2001-05-01

    The objective of the 3rd irradiation test of DUPIC fuel at the HANARO is to estimate the in-core behaviour of a DUPIC pellet that is irradiated up to more than average burnup of CANDU fuel. The irradiation of DUPIC fuel is planned to start at May 21, 2001, and will be continued at least for 8 months. The burnup of DUPIC fuel through this irradiation test is thought to be more than 7,000 MWd/tHE. The DUPIC irradiation rig instrumented with three SPN detectors will be used to accumulate the experience for the instrumented irradiation and to estimate the burnup of irradiated DUPIC fuel more accurately. Under normal operating condition, the maximum linear power of DUPIC fuel was estimated as 55.06 kW/m, and the centerline temperature of a pellet was calculated as 2510 deg C. In order to assess the integrity of DUPIC fuel under the accident condition postulated at the HANARO, safety analyses on the locked rotor and reactivity insertion accidents were carried out. The maximum centerline temperature of DUPIC fuel was estimated 2590 deg C and 2094 deg C for each accident, respectively. From the results of the safety analysis, the integrity of DUPIC fuel during the HANARO irradiation test will be secured. The irradiated DUPIC fuel will be transported to the IMEF. The post-irradiation examinations are planned to be performed at the PIEF and IMEF.

  14. Evaluation of Flygt Mixers for Application in Savannah River Site Tank 19. Test Results from Phase B: Mid-Scale Testing at PNNL

    International Nuclear Information System (INIS)

    Powell, M.R.; Combs, W.H.; Farmer, J.R.; Gladki, H.; Hatchell, B.K.; Johnson, M.A.; Poirier, M.R.; Rodwell, P.O.

    1999-01-01

    Pacific Northwest National Laboratory (PNNL) performed mixer tests using 3-kW (4-hp) Flygt mixers in 1.8- and 5.7-m-diameter tanks at the 336 building facility in Richland, Washington to evaluate candidate scaling relationships for Flygt mixers used for sludge mobilization and particle suspension. These tests constituted the second phase of a three-phase test program involving representatives from ITT Flygt Corporation, the Savannah River Site (SRS), the Oak Ridge National Laboratory (ORNL), and PNNL. The results of the first phase of tests, which were conducted at ITT Flygt's facility in a 0.45-m-diameter tank, are documented in Powell et al. (1999). Although some of the Phase B tests were geometrically similar to selected Phase A tests (0.45-m tank), none of the Phase B tests were geometrically, cinematically, and/or dynamically similar to the planned Tank 19 mixing system. Therefore, the mixing observed during the Phase B tests is not directly indicative of the mixing expected in Tank 19 and some extrapolation of the data is required to make predictions for Tank 19 mixing. Of particular concern is the size of the mixer propellers used for the 5.7-m tank tests. These propellers were more than three times larger than required by geometric scaling of the Tank 19 mixers. The implications of the lack of geometric similarity, as well as other factors that complicate interpretation of the test results, are discussed in Section 5.4

  15. Updated FY12 Ceramic Fuels Irradiation Test Plan

    International Nuclear Information System (INIS)

    Nelson, Andrew T.

    2012-01-01

    The Fuel Cycle Research and Development program is currently devoting resources to study of numerous fuel types with the aim of furthering understanding applicable to a range of reactors and fuel cycles. In FY11, effort within the ceramic fuels campaign focused on planning and preparation for a series of rabbit irradiations to be conducted at the High Flux Isotope Reactor located at Oak Ridge National Laboratory. The emphasis of these planned tests was to study the evolution of thermal conductivity in uranium dioxide and derivative compositions as a function of damage induced by neutron damage. Current fiscal realities have resulted in a scenario where completion of the planned rabbit irradiations is unlikely. Possibilities for execution of irradiation testing within the ceramic fuels campaign in the next several years will thus likely be restricted to avenues where strong synergies exist both within and outside the Fuel Cycle Research and Development program. Opportunities to augment the interests and needs of modeling, advanced characterization, and other campaigns present the most likely avenues for further work. These possibilities will be pursued with the hope of securing future funding. Utilization of synthetic microstructures prepared to better understand the most relevant actors encountered during irradiation of ceramic fuels thus represents the ceramic fuel campaign's most efficient means to enhance understanding of fuel response to burnup. This approach offers many of the favorable attributes embraced by the Separate Effects Testing paradigm, namely production of samples suitable to study specific, isolated phenomena. The recent success of xenon-imbedded thick films is representative of this approach. In the coming years, this strategy will be expanded to address a wider range of problems in conjunction with use of national user facilities novel characterization techniques to best utilize programmatic resources to support a science-based research program.

  16. Nevada Test Site Site Treatment Plan. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada's input. The options and schedules reflect a ''bottoms-up'' approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions

  17. Pretreatment Engineering Platform Phase 1 Final Test Report

    International Nuclear Information System (INIS)

    Kurath, Dean E.; Hanson, Brady D.; Minette, Michael J.; Baldwin, David L.; Rapko, Brian M.; Mahoney, Lenna A.; Schonewill, Philip P.; Daniel, Richard C.; Eslinger, Paul W.; Huckaby, James L.; Billing, Justin M.; Sundar, Parameshwaran S.; Josephson, Gary B.; Toth, James J.; Yokuda, Satoru T.; Baer, Ellen B.K.; Barnes, Steven M.; Golovich, Elizabeth C.; Rassat, Scot D.; Brown, Christopher F.; Geeting, John G.H.; Sevigny, Gary J.; Casella, Amanda J.; Bontha, Jagannadha R.; Aaberg, Rosanne L.; Aker, Pamela M.; Guzman-Leong, Consuelo E.; Kimura, Marcia L.; Sundaram, S.K.; Pires, Richard P.; Wells, Beric E.; Bredt, Ofelia P.

    2009-01-01

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes. Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.

  18. Pretreatment Engineering Platform Phase 1 Final Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Kurath, Dean E.; Hanson, Brady D.; Minette, Michael J.; Baldwin, David L.; Rapko, Brian M.; Mahoney, Lenna A.; Schonewill, Philip P.; Daniel, Richard C.; Eslinger, Paul W.; Huckaby, James L.; Billing, Justin M.; Sundar, Parameshwaran S.; Josephson, Gary B.; Toth, James J.; Yokuda, Satoru T.; Baer, Ellen BK; Barnes, Steven M.; Golovich, Elizabeth C.; Rassat, Scot D.; Brown, Christopher F.; Geeting, John GH; Sevigny, Gary J.; Casella, Amanda J.; Bontha, Jagannadha R.; Aaberg, Rosanne L.; Aker, Pamela M.; Guzman-Leong, Consuelo E.; Kimura, Marcia L.; Sundaram, S. K.; Pires, Richard P.; Wells, Beric E.; Bredt, Ofelia P.

    2009-12-23

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.

  19. Mechanisms Engineering Test Loop - Phase 1 Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Kultgen, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Grandy, C. [Argonne National Lab. (ANL), Argonne, IL (United States); Hvasta, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Lisowski, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Toter, W. [Argonne National Lab. (ANL), Argonne, IL (United States); Borowski, A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-09-01

    This report documents the current status of the Mechanisms Engineering Test Loop (METL) as of the end of FY2016. Currently, METL is in Phase I of its design and construction. Once operational, the METL facility will test small to intermediate-scale components and systems in order to develop advanced liquid metal technologies. Testing different components in METL is essential for the future of advanced fast reactors as it will provide invaluable performance data and reduce the risk of failures during plant operation.

  20. Construction of the two-phase critical flow test facility

    International Nuclear Information System (INIS)

    Chung, C. H.; Chang, S. K.; Park, H. S.; Min, K. H.; Choi, N. H.; Kim, C. H.; Lee, S. H.; Kim, H. C.; Chang, M. H.

    2002-03-01

    The two-phase critical test loop facility has been constructed in the KAERI engineering laboratory for the simulation of small break loss of coolant accident entrained with non-condensible gas of SMART. The test facility can operate at 12 MPa of pressure and 0 to 60 C of sub-cooling with 0.5 kg/s of non- condensible gas injection into break flow, and simulate up to 20 mm of pipe break. Main components of the test facility were arranged such that the pressure vessel containing coolant, a test section simulating break and a suppression tank inter-connected with pipings were installed vertically. As quick opening valve opens, high pressure/temperature coolant flows through the test section forming critical two-phase flow into the suppression tank. The pressure vessel was connected to two high pressure N2 gas tanks through a control valve to control pressure in the pressure vessel. Another N2 gas tank was also connected to the test section for the non-condensible gas injection. The test facility operation was performed on computers supported with PLC systems installed in the control room, and test data such as temperature, break flow rate, pressure drop across test section, gas injection flow rate were all together gathered in the data acquisition system for further data analysis. This test facility was classified as a safety related high pressure gas facility in law. Thus the loop design documentation was reviewed, and inspected during construction of the test loop by the regulatory body. And the regulatory body issued permission for the operation of the test facility

  1. 25 CFR 1000.50 - What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase requirements? 1000.50 Section 1000.50 Indians OFFICE OF THE...) Planning and Negotiation Grants Advance Planning Grant Funding § 1000.50 What must a Tribe/Consortium...

  2. Phased array UT (Ultrasonic Testing) used in electricity production plants

    International Nuclear Information System (INIS)

    Kodaira, Takeshi

    2012-01-01

    Phased Array-Ultrasonic testing techniques widely used for detection and quantitative determination of the lattice defects which have been formed from fatigues or stress corrosion cracking in the materials used in the electricity production plants are presented with particular focus on the accurate determination of the defects depth (sizing) and defects discrimination applicable to weld metals of austenite stainless steels and Ni base alloys. The principle of this non-destructive analysis is briefly explained, followed by point and matrix focus phased array methods developed by Mitsubishi Heavy Industries, Ltd are explained rather in detail with illustration and the evaluated results. (S. Ohno)

  3. Acute social stress before the planning phase improves memory performance in a complex real life-related prospective memory task.

    Science.gov (United States)

    Glienke, Katharina; Piefke, Martina

    2016-09-01

    Successful execution of intentions, but also the failure to recall are common phenomena in everyday life. The planning, retention, and realization of intentions are often framed as the scientific concept of prospective memory. The current study aimed to examine the influence of acute stress on key dimensions of complex "real life" prospective memory. To this end, we applied a prospective memory task that involved the planning, retention, and performance of intentions during a fictional holiday week. Forty healthy males participated in the study. Half of the subjects were stressed with the Socially Evaluated Cold Pressor Test (SECPT) before the planning of intentions, and the other half of the participants underwent a control procedure at the same time. Salivary cortisol was used to measure the effectiveness of the SECPT stress induction. Stressed participants did not differ from controls in planning accuracy. However, when we compared stressed participants with controls during prospective memory retrieval, we found statistically significant differences in PM across the performance phase. Participants treated with the SECPT procedure before the planning phase showed improved prospective memory retrieval over time, while performance of controls declined. Particularly, there was a significant difference between the stress and control group for the last two days of the holiday week. Interestingly, control participants showed significantly better performance for early than later learned items, which could be an indicator of a primacy effect. This differential effect of stress on performance was also found in time- and event-dependent prospective memory. Our results demonstrate for the first time, that acute stress induced before the planning phase may improve prospective memory over the time course of the performance phase in time- and event-dependent prospective memory. Our data thus indicate that prospective memory can be enhanced by acute stress. Copyright © 2016

  4. Manual for operation of the multipurpose thermalhydraulic test facility TOPFLOW (Transient Two Phase Flow Test Facility)

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schuetz, H.; Pietruske, H.; Lenk, S.

    2004-07-01

    The Forschungszentrum Rossendorf (FZR) e. V. is constructing a new large-scale test facility, TOPFLOW, for thermalhydraulic single effect tests. The acronym stands for transient two phase flow test facility. It will mainly be used for the investigation of generic and applied steady state and transient two phase flow phenomena and the development and validation of models of computational fluid dynamic (CFD) codes. The manual of the test facility must always be available for the staff in the control room and is restricted condition during operation of personnel and also reconstruction of the facility. (orig./GL)

  5. PHASE-II PLANS FOR ATLAS LIQUID ARGON CALORIMETER UPGRADES.

    CERN Document Server

    Orr, RS; The ATLAS collaboration

    2014-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 1034cm-2s-1. Although the nominal LHC experimental programme is still in progress, plans are already being developed for operation of the LHC and associated detectors at luminosities of up to 5x1034cm-2s-1, with the goal of accumulating an integrated luminosity of 3000 fb-1. This program is known as the high-luminosity LHC, or HLLHC. The proposed instantaneous and integrated luminosities are both well beyond the values for which the detectors were designed, and it is anticipated that several problems will arise. In this article we discuss problems and proposed solutions, concentrating on the forward calorimeter technologies proposed, and possible changes in the electronics for the hadronic endcap calorimeters

  6. Phase-II Plans for ATLAS Liquid Argon Calorimeter Upgrades.

    CERN Document Server

    Orr, RS; The ATLAS collaboration

    2013-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 1034cm-2s-1. Although the nominal LHC experimental programme is still in progress, plans are already being developed for operation of the LHC and associated detectors at luminosities of up to 5x1034 cm-2s-1, with the goal of accumulating an integrated luminosity of 3000 fb-1. This program is known as the high-luminosity LHC, or HL-LHC. The proposed instantaneous and integrated luminosities are both well beyond the values for which the detectors were designed, and it is anticipated that several problems will arise. In this talk we will discuss problems and proposed solutions, concentrating on the forward calorimeter technologies proposed, and possible changes in the electronics for the hadronic endcap calorimters.

  7. Scientific investigation plan for initial engineered barrier system field tests

    International Nuclear Information System (INIS)

    Wunan Lin.

    1993-02-01

    The purpose of this Scientific Investigation Plan (SIP) is to describe tests known as Initial Engineered Barrier System Field Tests (IEBSFT) and identified by Work Breakdown Structure as WBS 1.2.2.2.4. The IEBSFT are precursors to the Engineered Barrier System Field Test (EBSFT), WBS 1.2.2.2.4, to be conducted in the Exploratory Study Facility (ESF) at Yucca Mountain. The EBSFT and IEBSFT are designed to provide information on the interaction between waste packages (simulated by heated containers) and the surrounding rock mass, its vadose water, and infiltrated water. Heater assemblies will be installed in drifts or boreholes openings and heated to measure moisture movement during heat-up and subsequent cool-down of the rock mass. In some of the tests, infiltration of water into the heated rock mass will be studied. Throughout the heating and cooling cycle, instruments installed in the rock will monitor such parameters as temperature, moisture content, concentration of some chemical species, and stress and strain. Rock permeability measurements, rock and fluid (water and gas) sampling, and fracture pattern measurements will also be made before and after the test

  8. Horonobe Underground Research Laboratory Project. Plans for surface-based investigations. Phase 1

    International Nuclear Information System (INIS)

    Goto, Junichi; Hama, Katsuhiro

    2003-10-01

    for the geological environment. Information on earthquake/fault activities, uplift/subsidence/denudation processes and crustal activities are collected and integrated by literature survey, surface geological investigations and earthquake monitoring in c) Study on the long-term stability of the geological environment. Designing of the underground facility, examination of construction management methods, and investigation plans for restoration techniques on damages of the construction are focussed in d) Development of the basis for engineering technologies in deep underground. Investigation plans for Phases 2 and 3 include e) Demonstration of technologies for engineered barrier and f) Development of methodologies for detailed designing of deep repositories. Safety assessment models are tested and improved, and items, amount and accuracy of data for safety assessment are confirmed through investigations for g) Improvement of reliability on safety assessment methods. Environmental survey in the laboratory construction area, and designing and land development for ground facilities are conducted in Phase 1. A part of the research and development for the 'Earthquake Frontier Research Project' is also to be conducted. (author)

  9. Acoustic conditions in open plan offices – Pilot test results

    Directory of Open Access Journals (Sweden)

    Witold Mikulski

    2016-10-01

    Full Text Available Background: The main source of noise in open plan office are conversations. Office work standards in such premises are attained by applying specific acoustic adaptation. This article presents the results of pilot tests and acoustic evaluation of open space rooms. Material and Methods: Acoustic properties of 6 open plan office rooms were the subject of the tests. Evaluation parameters, measurement methods and criterial values were adopted according to the following standards: PN-EN ISO 3382- 3:2012, PN-EN ISO 3382-2:2010, PN-B-02151-4:2015-06 and PN-B-02151-3:2015-10. Results: The reverberation time was 0.33– 0.55 s (maximum permissible value in offices – 0.6 s; the criterion was met, sound absorption coefficient in relation to 1 m2 of the room’s plan was 0.77–1.58 m2 (minimum permissible value – 1.1 m2; 2 out of 6 rooms met the criterion, distraction distance was 8.5–14 m (maximum permissible value – 5 m; none of the rooms met the criterion, A-weighted sound pressure level of speech at a distance of 4 m was 43.8–54.7 dB (maximum permissible value – 48 dB; 2 out of 6 rooms met the criterion, spatial decay rate of the speech was 1.8–6.3 dB (minimum permissible value – 7 dB; none of the rooms met the criterion. Conclusions: Standard acoustic treatment, containing sound absorbing suspended ceiling, sound absorbing materials on the walls, carpet flooring and sound absorbing workplace barriers, is not sufficient. These rooms require specific advanced acoustic solutions. Med Pr 2016;67(5:653–662

  10. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  11. Verifying seismic design of nuclear reactors by testing. Volume 1: test plan

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-20

    This document sets forth recommendations for a verification program to test the ability of operational nuclear power plants to achieve safe shutdown immediately following a safe-shutdown earthquake. The purpose of the study is to develop a program plan to provide assurance by physical demonstration that nuclear power plants are earthquake resistant and to allow nuclear power plant operators to (1) decide whether tests should be conducted on their facilities, (2) specify the tests that should be performed, and (3) estimate the cost of the effort to complete the recommended test program.

  12. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  13. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  14. Heater test planning for the near surface test facility at the Hanford reservation

    International Nuclear Information System (INIS)

    DuBois, A.; Binnall, E.; Chan, T.; McEvoy, M.; Nelson, P.; Remer, J.

    1979-03-01

    The underground test facility NSTF being constructed at Gable Mountain, is the site for a group of experiments designed to evaluate the thermo-mechanical suitability of a deep basalt stratum as a permanent repository for nuclear waste. Thermo-mechanical modeling was performed to help design the instrumentation arrays for the three proposed heater tests (two full scale tests and one time scale test) and predict the thermal environment of the heaters and instruments. The modeling does not reflect recent RHO revisions to the in situ heater experiment plan. Heaters, instrumentation, and data acquisition system designs and recommendations were adapted from those used in Sweden

  15. Verifying seismic design of nuclear reactors by testing. Volume 1: test plan

    International Nuclear Information System (INIS)

    1979-01-01

    This document sets forth recommendations for a verification program to test the ability of operational nuclear power plants to achieve safe shutdown immediately following a safe-shutdown earthquake. The purpose of the study is to develop a program plan to provide assurance by physical demonstration that nuclear power plants are earthquake resistant and to allow nuclear power plant operators to (1) decide whether tests should be conducted on their facilities, (2) specify the tests that should be performed, and (3) estimate the cost of the effort to complete the recommended test program

  16. The Savannah River environmental technology field test platform: Phase II

    International Nuclear Information System (INIS)

    Rossabi, J.; Riha, B.D.; May, C.P.; Pemberton, B.E.; Jarosch, T.R.; Eddy-Dilek, C.A.; Looney, B.B.; Raymond, R.

    1995-01-01

    The principal goal in the development of new technologies for environmental monitoring and characterization is transferring them to organizations and individuals for use in site assessment and compliance monitoring. The DOE complex has devised several strategies to facilitate this transfer including joint research projects between private industries and government laboratories or universities (CRADAs), and streamlined licensing procedures. One strategy that has been under-utilized is a planned sequence gradually moving from laboratory development and field demonstration to long term evaluation and onsite use. Industrial partnership and commercial production can be initiated at any step based on the performance, market, user needs, and costs associated with the technology. The Savannah River Technology Center (SRTC) has been developing a program to rigorously field test promising environmental technologies that have not undergone EPA equivalency testing. The infrastructure and staff expertise developed as part of the activities of the Savannah River Integrated Demonstration Program (i.e., wells, available power, conventional baseline characterization and monitoring equipment, shelter structures) allows field testing of technologies without the difficulties of providing remote field support. By providing a well-characterized site and a well-developed infrastructure, technologies can be tested for long periods of time to determine their appropriate applications in environmental characterization and monitoring activities. Situation specific evaluations of the technology following stringent test plans can be made in comparison with simultaneous baseline methods and historical data. This program is designed to help expedite regulatory approval and technology transfer to manufacturers and the user community

  17. A simple uniformity test for ultrasound phased arrays.

    Science.gov (United States)

    Dudley, Nicholas J; Woolley, Darren J

    2016-09-01

    It is difficult to test phased array ultrasound transducers for non functioning elements. We aimed to modify a widely performed test to improve its ease and effectiveness for these arrays. A paperclip was slowly moved along the transducer array, with the scanner operating in M-mode, imaging at a fundamental frequency with automatic gain and grey scale adjustment disabled. Non-functioning elements are identified by a dark vertical line in the image. The test was repeated several times for each transducer, looking for consistency of results. 2 transducers, with faults already shown by electronic transducer testing, were used to validate the method. 23 transducers in clinical use were tested. The results of the modified test on the 2 faulty transducers agreed closely with electronic transducer testing results. The test indicated faults in 5 of the 23 transducers in clinical use: 3 with a single failed element and 2 with non-uniform sensitivity. 1 transducer with non-uniform sensitivity had undergone lens repair; the new lens was visibly non-uniform in thickness and further testing showed a reduction in depth of penetration and a loss of elevational focus in comparison with a new transducer. The modified test is capable of detecting non-functioning elements. Further work is required to provide a better understanding of more subtle faults. Copyright © 2016 Associazione Italiana di Fisica Medica. All rights reserved.

  18. Test plan for Series 2 spent fuel cladding containment credit tests

    International Nuclear Information System (INIS)

    Wilson, C.N.

    1984-10-01

    This test plan describes a second series of tests to be conducted by Westinghouse Hanford Company (WHC) to evaluate the effectiveness of breached cladding as a barrier to radionuclide release in the NNWSI-proposed geologic repository. These tests will be conducted at the Hanford Engineering Development Laboratory (HEDL). A first series of tests, initiated at HEDL during FY 1983, demonstrated specimen preparation and feasibility of the testing concept. The second series tests will be similar to the Series 1 tests with the following exceptions: NNWSI reference groundwater obtained from well J-13 will be used as the leachant instead of deionized water; fuel from a second source will be used; and certain refinements will be made in specimen preparation, sampling, and analytical procedures. 12 references, 5 figures, 5 tables

  19. Reliability Analysis and Test Planning using CAPO-Test for Existing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Engelund, S.; Faber, Michael Havbro

    2000-01-01

    Evaluation of the reliability of existing concrete structures often requires that the compressive strength of the concrete is estimated on the basis of tests performed with concrete samples from the structure considered. In this paper the CAPO-test method is considered. The different sources...... of uncertainty related to this method are described. It is shown how the uncertainty in the transformation from the CAPO-test results to estimates of the concrete strength can be modeled. Further, the statistical uncertainty is modeled using Bayesian statistics. Finally, it is shown how reliability-based optimal...... planning of CAPO-tests can be performed taking into account the expected costs due to the CAPO-tests and possible repair or failure of the structure considered. An illustrative example is presented where the CAPO-test is compared with conventional concrete cylinder compression tests performed on cores...

  20. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  1. Automatic Identification System (AIS) Transmit Testing in Louisville Phase 2

    Science.gov (United States)

    2014-08-01

    Firewall Louisville QM 65.206.28.x NAIS Site Controller PC RS232 Serial cable TV32 Computer Cmd Center Serial splitter SAAB R40 AIS Base Station...172.17.14.6 Rack mount computer AIS Radio Interface Ethernet Switch 192.168.0.x Firewall Cable Modem 192.168.0.1 VTS Accred. Boundary serial connection...Automatic Identification System ( AIS ) Transmit Testing in Louisville Phase 2 Distribution Statement A: Approved for public release

  2. Phase II Vault Testing of the Argonne RFID System

    International Nuclear Information System (INIS)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-01-01

    The U.S. Department of Energy (DOE) (Environmental Management (EM), Office of Packaging and Transportation (EM-45)) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase

  3. PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-06-25

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step

  4. BWR Full Integral Simulation Test (FIST) Phase II test results and TRAC-BWR model qualification

    International Nuclear Information System (INIS)

    Sutherland, W.A.; Alamgir, M.; Findlay, J.A.; Hwang, W.S.

    1985-10-01

    Eight matrix tests were conducted in the FIST Phase I. These tests investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. There are nine tests in Phase II of the FIST program. They include the following LOCA tests: BWR/6 LPCI line break, BWR/6 intermediate size recirculation break, and a BWR/4 large break. Steady state natural circulation tests with feedwater makeup performed at high and low pressure, and at high pressure with HPCS makeup, are included. Simulation of a transient without rod insertion, and with controlled depressurization, was performed. Also included is a simulation of the Peach Bottom turbine trip test. The final two tests simulated a failure to maintain water level during a postulated accident. A FIST program objective is to assess the TRAC code by comparisons with test data. Two post-test predictions made with TRACB04 are compared with Phase II test data in this report. These are for the BWR/6 LPCI line break LOCA, and the Peach Bottom turbine trip test simulation

  5. Phased array ultrasonic testing of dissimilar metal pipe weld joints

    International Nuclear Information System (INIS)

    Rajeev, J.; Sankaranarayanan, R.; Sharma, Govind K; Joseph, A.; Purnachandra Rao, B.

    2015-01-01

    Dissimilar metal weld (DMW) joints made of stainless steel and ferritic steel is used in nuclear industries as well as oil and gas industries. These joints are prone to frequent failures which makes the non-destructive testing of dissimilar metal weld joints utmost important for reliable and safe operation of nuclear power plants and oil and gas industries. Ultrasonic inspection of dissimilar metal weld joints is still challenging due to the inherent anisotropic and highly scattering nature. Phased array ultrasonic testing (PAUT) is an advanced technique and its capability has not been fully explored for the inspection of dissimilar metal welds

  6. Excitation power quantities in phase resonance testing of nonlinear systems with phase-locked-loop excitation

    Science.gov (United States)

    Peter, Simon; Leine, Remco I.

    2017-11-01

    Phase resonance testing is one method for the experimental extraction of nonlinear normal modes. This paper proposes a novel method for nonlinear phase resonance testing. Firstly, the issue of appropriate excitation is approached on the basis of excitation power considerations. Therefore, power quantities known from nonlinear systems theory in electrical engineering are transferred to nonlinear structural dynamics applications. A new power-based nonlinear mode indicator function is derived, which is generally applicable, reliable and easy to implement in experiments. Secondly, the tuning of the excitation phase is automated by the use of a Phase-Locked-Loop controller. This method provides a very user-friendly and fast way for obtaining the backbone curve. Furthermore, the method allows to exploit specific advantages of phase control such as the robustness for lightly damped systems and the stabilization of unstable branches of the frequency response. The reduced tuning time for the excitation makes the commonly used free-decay measurements for the extraction of backbone curves unnecessary. Instead, steady-state measurements for every point of the curve are obtained. In conjunction with the new mode indicator function, the correlation of every measured point with the associated nonlinear normal mode of the underlying conservative system can be evaluated. Moreover, it is shown that the analysis of the excitation power helps to locate sources of inaccuracies in the force appropriation process. The method is illustrated by a numerical example and its functionality in experiments is demonstrated on a benchmark beam structure.

  7. Test plan: Gas-threshold-pressure testing of the Salado Formation in the WIPP underground facility

    International Nuclear Information System (INIS)

    Saulnier, G.J. Jr.

    1992-03-01

    Performance assessment for the disposal of radioactive waste from the United States defense program in the WIPP underground facility must assess the role of post-closure was generation by waste degradation and the subsequent pressurization of the facility. be assimilated by the host formation will Whether or not the generated gas can be assimilated by the host formation will determine the ability of the gas to reach or exceed lithostatic pressure within the repository. The purpose of this test plan is (1) to present a test design to obtain realistic estimates of gas-threshold pressure for the Salado Formation WIPP underground facility including parts of the formation disturbed by the underground of the Salado, and (2) to provide a excavations and in the far-field or undisturbed part framework for changes and amendments to test objectives, practices, and procedures. Because in situ determinations of gas-threshold pressure in low-permeability media are not standard practice, the methods recommended in this testplan are adapted from permeability-testing and hydrofracture procedures. Therefore, as the gas-threshold-pressure testing program progresses, personnel assigned to the program and outside observers and reviewers will be asked for comments regarding the testing procedures. New and/or improved test procedures will be documented as amendments to this test plan, and subject to similar review procedures

  8. Test plan for Enraf Series 854 level gauge testing in Tank 241-S-106

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1994-01-01

    An Enraf Series 854 level gauge was installed on Tank 241-S-106 (S-106) during the first week of June 1994. On August 11, 1994, the gauge's measuring wire broke. An investigation has been started to determine how the wire broke. This test plan identifies a qualification test that is part of this investigation. This test will also provide evidence as to the location and extent of potential corrosion on the measuring wire due to tank environment. The results from this testing will provide data for better material selections. This test will involve placing the existing Enraf Series 854 level gauge back into service with the same type of measuring wire (316 stainless steel) that originally broke on August 11, 1994. The gauge will be operated for 14 days. At the end of the 14-day test, the wire shall be sent to Pacific Northwest Laboratory (PNL) for analysis

  9. Prototype steam generator test at SCTI/ETEC. Acoustic program test plan

    International Nuclear Information System (INIS)

    Greene, D.A.; Thiele, A.; Claytor, T.N.

    1981-10-01

    This document is an integrated test plan covering programs at General Electric (ARSD), Rockwell International (RI) and Argonne National Laboratory (CT). It provides an overview of the acoustic leak detection test program which will be completed in conjunction with the prototype LMFBR steam generator at the Energy Technology Engineering Laboratory. The steam generator is installed in the Sodium Components Test Installation (SCTI). Two acoustic detection systems will be used during the test program, a low frequency system developed by GE-ARSD (GAAD system) and a high frequency system developed by RI-AI (HALD system). These systems will be used to acquire data on background noise during the thermal-hydraulic test program. Injection devices were installed during fabrication of the prototype steam generator to provide localized noise sources in the active region of the tube bundle. These injectors will be operated during the steam generator test program, and it will be shown that they are detected by the acoustic systems

  10. Preliminary observations of gate valve flow interruption tests, Phase 2

    International Nuclear Information System (INIS)

    Steele, R. Jr.; DeWall, K.G.

    1990-01-01

    This paper presents preliminary observations from the US Nuclear Regulatory Commission/Idaho National Engineering Laboratory Flexible Wedge Gate Valve Qualification and Flow Interruption Test Program, Phase 2. The program investigated the ability of selected boiling water reactor (BWR) process line valves to perform their containment isolation function at high energy pipe break conditions and other more normal flow conditions. The fluid and valve operating responses were measured to provide information concerning valve and operator performance at various valve loadings so that the information could be used to assess typical nuclear industry motor operator sizing equations. Six valves were tested, three 6-in. isolation valves representative of those used in reactor water cleanup systems in BWRs and three 10-in. isolation valves representative of those used in BWR high pressure coolant injection (HPCI) steam lines. The concern with these normally open isolation valves is whether they will close in the event of a downstream pipe break outside of containment. The results of this testing will provide part of the technical insights for NRC efforts regarding Generic Issue 87 (GI-87), Failure of the HPCI Steam Line Without Isolation, which includes concerns about the uncertainties in gate valve motor operator sizing and torque switch settings for these BWR containment isolation valves. As of this writing, the Phase 2 test program has just been completed. Preliminary observations made in the field confirmed most of the results from the Phase 1 test program. All six valves closing in high energy water, high energy steam, and high pressure cold water require more force to close than would be calculated using the typical variables in the standard industry motor operator sizing equations

  11. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  12. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  13. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  14. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  15. FED firmware interface testing with pixel phase 1 emulator

    CERN Document Server

    Kilpatrick, Matthew

    2017-01-01

    A hardware emulation of the CMS pixel detector phase 1 upgrade front-end electronics has been developed to test and validate the architecture of the back-end electronics (FED) firmware. The emulation is implemented on a Virtex 6 FPGA on the CERN GLIB uTCA platform, utilizing an 8-way SFP FPGA Mezzanine Card to drive compatible optical transmitters to the back-end electronics at 400 bps. The firmware emulates the complex functions of the phase 1 pixel readout chips (PSI46digv2 and PROC600) and token bit manager ASICs and allows for possible abnormalities that can occur in the output data stream. The emulation implements both fixed data patterns that are used as test vectors and realistic simulated data to drive the readout of the FED at the expected data and trigger rates. Testing software was developed to control the emulator and verify correct transmission of data and exception handling in the FED. An installation has been integrated into the pixel DAQ test system at CMS to be used for fast validation of F...

  16. FED firmware interface testing with pixel phase 1 emulator

    CERN Document Server

    Kilpatrick, Matthew

    2018-01-01

    A hardware emulation of the CMS pixel detector phase 1 upgrade front-end electronics has been developed to test and validate the architecture of the back-end electronics (FED) firmware. The emulation is implemented on a Virtex 6 FPGA on the CERN GLIB uTCA platform, utilizing an 8-way SFP FPGA Mezzanine Card to drive compatible optical transmitters to the back-end electronics at 400 bps. The firmware emulates the complex functions of the phase 1 pixel readout chips (PSI46digv2 and PROC600) and token bit manager ASICs and allows for possible abnormalities that can occur in the output data stream. The emulation implements both fixed data patterns that are used as test vectors and realistic simulated data to drive the readout of the FED at the expected data and trigger rates. Testing software was developed to control the emulator and verify correct transmission of data and exception handling in the FED. An installation has been integrated into the pixel DAQ test system at CMS to be used for fast validation of F...

  17. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan; Wallen, Robb

    2015-06-10

    Many gearboxes in wind turbines have not been achieving their expected design life [1]; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, has elevated the cost of wind energy. In 2006, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its key goal is to understand the root causes of premature gearbox failures and improve their reliability [2]. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This test report describes the recent tests of GRC gearbox (GB) 2 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan [3]. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. Specific objectives of the test were to assess the effect of dynamic nontorque load (NTL) on the planetary section, generator misalignment on the highspeed shaft (HSS), and field representative conditions on the gearbox in general. Detailed analysis of those test objectives will be presented in subsequent publications.

  18. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  19. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  20. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  1. Test plan for buried waste containment system materials

    International Nuclear Information System (INIS)

    Weidner, J.; Shaw, P.

    1997-03-01

    The objectives of the FY 1997 barrier material work at the Idaho National Engineering and Environmental Laboratory are to (1) select a waste barrier material and verify that it is compatible with the Buried Waste Containment System Process, and (2) determine if, and how, the Buried Waste Containment System emplacement process affects the material properties and performance (on proof of principle scale). This test plan describes a set of measurements and procedures used to validate a waste barrier material for the Buried Waste Containment System. A latex modified proprietary cement manufactured by CTS Cement Manufacturing Company will be tested. Emplacement properties required for the Buried Waste Containment System process are: slump between 8 and 10 in., set time between 15 and 30 minutes, compressive strength at set of 20 psi minimum, and set temperature less than 100 degrees C. Durability properties include resistance to degradation from carbonate, sulfate, and waste-site soil leachates. A set of baseline barrier material properties will be determined to provide a data base for comparison with the barrier materials when tested in the field. The measurements include permeability, petrographic analysis to determine separation and/or segregation of mix components, and a set of mechanical properties. The measurements will be repeated on specimens from the field test material. The data will be used to determine if the Buried Waste Containment System equipment changes the material. The emplacement properties will be determined using standard laboratory procedures and instruments. Durability of the barrier material will be evaluated by determining the effect of carbonate, sulfate, and waste-site soil leachates on the compressive strength of the barrier material. The baseline properties will be determined using standard ASTM procedures. 9 refs., 1 fig., 2 tabs

  2. Test Plan for the Boiling Water Reactor Dry Cask Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    canister. The symmetric single assembly geometry with well-controlled boundary conditions simplifies interpretation of results. Various configurations of outer concentric ducting will be used to mimic conditions for above and below-ground storage configurations of vertical, dry cask systems with canisters. Radial and axial temperature profiles will be measured for a wide range of decay power and helium cask pressures. Of particular interest is the evaluation of the effect of increased helium pressure on allowable heat load and the effect of simulated wind on a simplified below ground vent configuration. While incorporating the best available information, this test plan is subject to changes due to improved understanding from modeling or from as-built deviations to designs. As-built conditions and actual procedures will be documented in the final test report.

  3. CERN's PS Booster LLRF renovation : plans and initial beam tests

    CERN Document Server

    Angoletta, ME; Butterworth, A; Findlay, A; Leinonen, PM; Molendijk, JC; Pedersen, F; Sanchez-Quesada, J; Schokker, M

    2010-01-01

    In 2008 a project was started to renovate the CERN's PS Booster (PSB) low-level RF (LLRF). Required LLRF capabilities include frequency program, beam phase, radial and synchronization loops. The new LLRF will control the signals feeding the three RF cavities present in each ring; it will also shape the beam in a dual harmonic mode, operate a bunch splitting and create a longitudinal blow-up. The main benefits of this new LLRF are its full remote and cycle-to-cycle controllability, built-in observation capability and flexibility. The overall aim is to improve the robustness, maintainability and reliability of the PSB operation and to make it compatible with the injection from the future Linac4. This paper outlines the main characteristics of the software and hardware building blocks. Initial beam test results and hints on the main milestones and future work are also given.

  4. Test plan: Hydraulic fracturing and hydrologic tests in Marker Beds 139 and 140

    International Nuclear Information System (INIS)

    Wawersik, W.R.; Beauheim, R.L.

    1991-03-01

    Combined hydraulic fracturing and hydrological measurements in this test plan are designed to evaluate the potential influence of fracture formation in anhydrite Marker Beds 139 and 140 on gas pressure in and gas flow from the disposal rooms in the Waste Isolation Pilot Plant with time. The tests have the further purpose of providing comparisons of permeabilities of anhydrite interbeds in an undisturbed (virgin) state and after fracture development and/or opening and dilation of preexisting partially healed fractures. Three sets of combined hydraulic fracturing and hydrological measurements are planned. A set of trial measurements is expected to last four to six weeks. The duration of each subsequent experiment is anticipated to be six to eight weeks

  5. Test plan for the remote conveyance and innovative end effector demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Rice, P.; Smith, A.M. [EG& G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration.

  6. Test plan for the remote conveyance and innovative end effector demonstration

    International Nuclear Information System (INIS)

    Rice, P.; Smith, A.M.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration

  7. 29 CFR 4231.6 - Plan solvency tests.

    Science.gov (United States)

    2010-07-01

    .... The actuary may select as the amortization period either— (i) The first 25 plan years beginning on or... determined under the funding method and assumptions expected to be used by the plan actuary for purposes of...

  8. 105-N Basin sediment disposition phase-one sampling and analysis plan

    International Nuclear Information System (INIS)

    1997-01-01

    The sampling and analysis plan (SAP) for Phase 1 of the 105-N Basin sediment disposition project defines the sampling and analytical activities that will be performed for the engineering assessment phase (phase 1) of the project. A separate SAP defines the sampling and analytical activities that will be performed for the characterization phase (Phase 2) of the 105-N sediment disposition project. The Phase-1 SAP is presented in the introduction (Section 1.0), in the field sampling plan (FSP) (Section 2.0), and in the quality assurance project plan (QAPjP) (Section 3.0). The FSP defines the sampling and analytical methodologies to be performed. The QAPjP provides information on the quality assurance/quality control (QA/QC) parameters related to the sampling and analytical methodologies. This SAP defines the strategy and the methods that will be used to sample and analyze the sediment on the floor of the 105-N Basin. The resulting data will be used to develop and evaluate engineering designs for collecting and removing sediment from the basin

  9. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  10. Planned Experiments on the Princeton Advanced Test Stand

    Science.gov (United States)

    Stepanov, A.; Gilson, E. P.; Grisham, L.; Kaganovich, I.; Davidson, R. C.

    2010-11-01

    The Princeton Advanced Test Stand (PATS) device is an experimental facility based on the STS-100 high voltage test stand transferred from LBNL. It consists of a multicusp RF ion source, a pulsed extraction system capable of forming high-perveance 100keV ion beams, and a large six-foot-long vacuum with convenient access for beam diagnostics. This results in a flexible system for studying high perveance ion beams relevant to NDCX-I/II, including experiments on beam neutralization by ferroelectric plasma sources (FEPS) being developed at PPPL. Research on PATS will concern the basic physics of beam-plasma interactions, such as the effects of volume neutralization on beam emittance, as well as optimizing technology of the FEPS. PATS combines the advantage of an ion beam source and a large-volume plasma source in a chamber with ample access for diagnostics, resulting in a robust setup for investigating and improving relevant aspects of neutralized drift. There are also plans for running the ion source with strongly electro-negative gases such as chlorine, making it possible to extract positive or negative ion beams.

  11. Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype

    International Nuclear Information System (INIS)

    Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

    1994-04-01

    This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier

  12. Test results and commercialization plans for long life Stirling generators

    International Nuclear Information System (INIS)

    Erbeznik, R.M.; White, M.A.

    1996-01-01

    Many optimistic predictions regarding commercialization of Stirling engines have been announced over the years, but to date no real successes have emerged. STC is excited to announce the availability of beta prototypes for its RemoteGen trademark family of free-piston Stirling generators. STC is working with suppliers, manufacturers, and beta customers to commercialize the RemoteGen family of generators. STC is proving that these machines overcome previously inhibiting barriers by providing long life, high reliability, cost effective mass production, and market relevance. Stirling power generators are generally acknowledged to offer much higher conversion efficiencies than direct energy conversion systems. Life and reliability, on the other hand, are generally considered superior for direct conversion systems, as established by the exceptional endurance records (though with degradation) for thermoelectric (TE) and photovoltaic (PV) systems. STC's unique approaches combine dynamic system efficiency with static system reliability. The RemoteGen family presently includes a 10-watt RG-10, a 350-watt RG-350, and with 1-kW and 3-kW sizes planned for the future. They all use the same basic configuration with flexure bearings, clearance seals, and moving iron linear alternators. The third generation RG-10 has entered limited production with a radioisotope-fueled version, and a niche market for a propane-fueled version has been identified. Market analysis has led STC to focus on early commercial production of the RG-350. The linear alternator power module portion of the RG-350 is also used in its sister BeCool trademark family of coolers as the linear motor. By using a common power module, both programs will benefit by each other's commercialization efforts. The technology behind the RemoteGen generators, test results, and plans for commercialization are described in this paper

  13. Test of a method for phase retrieval in HRTEM

    International Nuclear Information System (INIS)

    Beeching, M.J.; Spargo, A.E.C.

    1992-01-01

    Several methods of phase retrieval from the high resolution transmission electron microscopy image intensity distributions have been proposed but no standard method has emerged. The results achieved using a technique based on a development of the focus variation method, are reported. The dependence of the retrieved wavefunction on various experimental parameters is investigated and the method tested using computer simulated images. The method is shown to be useful in finding the complex wavefield at the exit surface of the specimen but the relationship of this to the specimen structure is considered as a separate issue. 1 ref., 3 figs

  14. Plutonium immobilization program - Cold pour Phase 1 test results

    International Nuclear Information System (INIS)

    Hamilton, L.

    2000-01-01

    The Plutonium Immobilization Project will disposition excess weapons grade plutonium. It uses the can-in-canister approach that involves placing plutonium-ceramic pucks in sealed cans that are then placed into Defense Waste Processing Facility canisters. These canisters are subsequently filled with high-level radioactive waste glass. This process puts the plutonium in a stable form and makes it unattractive for reuse. A cold (non-radioactive) glass pour program was performed to develop and verify the baseline design for the canister and internal hardware. This paper describes the Phase 1 scoping test results

  15. Plutonium Immobilization Program - Cold pour Phase 1 test results

    International Nuclear Information System (INIS)

    Hamilton, L.

    2000-01-01

    The Plutonium Immobilization Project will disposition excess weapons grade plutonium. It uses the can-in-canister approach that involves placing plutonium-ceramic pucks in sealed cans that are then placed into Defense Waste Processing Facility canisters. These canisters are subsequently filled with high-level radioactive waste glass. This process puts the plutonium in a stable form and makes it unattractive for reuse. A cold (non-radioactive) glass pour program was performed to develop and verify the baseline design for the canister and internal hardware. This paper describes the Phase 1 scoping test results

  16. Integrated Motion Planning and Autonomous Control Technology for Autonomous ISR, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI and MIT propose to design, implement and test a comprehensive Integrated Mission Planning \\ (ii) Develop, Implement (iii) Develop, Implement and (iii) Carry...

  17. Vectra GSI, Inc. low-level waste melter testing Phase 1 test report

    Energy Technology Data Exchange (ETDEWEB)

    Stegen, G.E.; Wilson, C.N.

    1996-02-21

    A multiphase program was initiated in 1994 to test commercially available melter technologies for the vitrification of the low-level waste (LLW) stream from defense wastes stored in underground tanks at the Hanford Site in southeastern Washington State. Vectra GSI, Inc. was one of seven vendors selected for Phase 1 of the melter demonstration tests using simulated LLW that were completed during fiscal year 1995. The attached report prepared by Vectra GSI, Inc. describes results of melter testing using slurry feed and dried feeds. Results of feed drying and prereaction tests using a fluid bed calciner and rotary dryer also are described.

  18. Vectra GSI, Inc. low-level waste melter testing Phase 1 test report

    International Nuclear Information System (INIS)

    Stegen, G.E.; Wilson, C.N.

    1996-01-01

    A multiphase program was initiated in 1994 to test commercially available melter technologies for the vitrification of the low-level waste (LLW) stream from defense wastes stored in underground tanks at the Hanford Site in southeastern Washington State. Vectra GSI, Inc. was one of seven vendors selected for Phase 1 of the melter demonstration tests using simulated LLW that were completed during fiscal year 1995. The attached report prepared by Vectra GSI, Inc. describes results of melter testing using slurry feed and dried feeds. Results of feed drying and prereaction tests using a fluid bed calciner and rotary dryer also are described

  19. The International intraval project. Phase 1 test cases

    International Nuclear Information System (INIS)

    1992-01-01

    This report contains a description of the test cases adopted in Phase 1 of the international cooperation project INTRAVAL. Seventeen test cases based on bench-scale experiments in laboratory, field tests and natural analogue studies, have been included in the study. The test cases are described in terms of experimental design and types of available data. In addition, some quantitative examples of available data are given as well as references to more extensive documentation of the experiments on which the test cases are based. Fithteen test cases examples are given: 1 Mass transfer through clay by diffusion and advection. 2 Uranium migration in crystalline bore cores, small scale pressure infiltration experiments. 3 Radionuclide migration in single natural fractures in granite. 4 Tracer tests in a deep basalt flow top. 5 Flow and tracer experiment in crystalline rock based on the Stripa 3-D experiment. 6 Tracer experiment in a fracture zone at the Finnsjon research area. 7 Synthetic data base, based on single fracture migration experiments in Grimsel rock laboratory. 8 Natural analogue studies at Pocos de Caldas, Minais Gerais, Brazil. Redox-front and radionuclide movement in an open pit uranium mine. 9 Natural analogue studies at the Koongarra site in the Alligator Rivers area of the Northern Territory, Australia. 10 Large block migration experiments in a block of crystalline rock. 11 Unsaturated flow and transport experiments performed at Las Cruces, New Mexico. 12 Flow and transport experiment in unsaturated fractured rock performed at the Apache Leap Tuff site, Arizona. 13 Experiments in partially saturated tuffaceous rocks performed in the G-tunnel underground facility at the Nevada Test site, USA. 14 Experimental study of brine transport in porous media. 15 Groundwater flow in the vicinity of the Gorleben Salt Dome, Federal Republic of Germany

  20. Graphite electrode arc melter demonstration Phase 2 test results

    International Nuclear Information System (INIS)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O'Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau's Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of open-quotes as-receivedclose quotes heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process

  1. Graphite electrode arc melter demonstration Phase 2 test results

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O`Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau`s Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of {open_quotes}as-received{close_quotes} heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process.

  2. Kilowatt isotope power system, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-15

    This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.

  3. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  4. Realization of station for testing asynchronous three-phase motors

    Science.gov (United States)

    Wróbel, A.; Surma, W.

    2016-08-01

    Nowadays, you cannot imagine the construction and operation of machines without the use of electric motors [13-15]. The proposed position is designed to allow testing of asynchronous three-phase motors. The position consists of a tested engine and the engine running as a load, both engines combined with a mechanical clutch [2]. The value of the load is recorded by measuring shaft created with Strain Gauge Bridge. This concept will allow to study the basic parameters of the engines, visualization motor parameters both vector and scalar controlled, during varying load drive system. In addition, registration during the variable physical parameters of the working electric motor, controlled by a frequency converter or controlled by a contactor will be possible. Position is designed as a teaching and research position to characterize the engines. It will be also possible selection of inverter parameters.

  5. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  6. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  7. Error Analysis in a Device to Test Optical Systems by Using Ronchi Test and Phase Shifting

    International Nuclear Information System (INIS)

    Cabrera-Perez, Brasilia; Castro-Ramos, Jorge; Gordiano-Alvarado, Gabriel; Vazquez y Montiel, Sergio

    2008-01-01

    In optical workshops, Ronchi test is used to determine the optical quality of any concave surface, while it is in the polishing process its quality is verified. The Ronchi test is one of the simplest and most effective methods used for evaluating and measuring aberrations. In this work, we describe a device to test converging mirrors and lenses either with small F/numbers or large F/numbers, using LED (Light-Emitting Diode) that has been adapted in the Ronchi testing as source of illumination. With LED used the radiation angle is bigger than common LED. It uses external power supplies to have well stability intensity to avoid error during the phase shift. The setup also has the advantage to receive automatic input and output data, this is possible because phase shifting interferometry and a square Ronchi ruling with a variable intensity LED were used. Error analysis of the different parameters involved in the test of Ronchi was made. For example, we analyze the error in the shifting of phase, the error introduced by the movement of the motor, misalignments of x-axis, y-axis and z-axis of the surface under test, error in the period of the grid used

  8. Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project

    International Nuclear Information System (INIS)

    Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

    1998-01-01

    This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle

  9. Planning an Availability Demonstration Test with Consideration of Confidence Level

    Directory of Open Access Journals (Sweden)

    Frank Müller

    2017-08-01

    Full Text Available The full service life of a technical product or system is usually not completed after an initial failure. With appropriate measures, the system can be returned to a functional state. Availability is an important parameter for evaluating such repairable systems: Failure and repair behaviors are required to determine this availability. These data are usually given as mean value distributions with a certain confidence level. Consequently, the availability value also needs to be expressed with a confidence level. This paper first highlights the bootstrap Monte Carlo simulation (BMCS for availability demonstration and inference with confidence intervals based on limited failure and repair data. The BMCS enables point-, steady-state and average availability to be determined with a confidence level based on the pure samples or mean value distributions in combination with the corresponding sample size of failure and repair behavior. Furthermore, the method enables individual sample sizes to be used. A sample calculation of a system with Weibull-distributed failure behavior and a sample of repair times is presented. Based on the BMCS, an extended, new procedure is introduced: the “inverse bootstrap Monte Carlo simulation” (IBMCS to be used for availability demonstration tests with consideration of confidence levels. The IBMCS provides a test plan comprising the required number of failures and repair actions that must be observed to demonstrate a certain availability value. The concept can be applied to each type of availability and can also be applied to the pure samples or distribution functions of failure and repair behavior. It does not require special types of distribution. In other words, for example, a Weibull, a lognormal or an exponential distribution can all be considered as distribution functions of failure and repair behavior. After presenting the IBMCS, a sample calculation will be carried out and the potential of the BMCS and the IBMCS

  10. Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans

    Science.gov (United States)

    Pogorelsky, I. V.; Ben-Zvi, I.

    2014-08-01

    The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.

  11. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  12. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  13. Joint Integration Test Facility (JITF) Engineering II Performance Measurement Plans

    National Research Council Canada - National Science Library

    Boucher, Joanne

    2001-01-01

    ..., effectiveness, and accountability in federal programs and spending. The plan establishes six separate performance measurements, which correlate directly to customer satisfaction, Intelligence Mission Application (IMA...

  14. Facility effluent monitoring plan for the fast flux test facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Dahl, N.R.

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  15. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  16. Safety test No. S-6, launch pad abort sequential test Phase II: solid propellant fire

    International Nuclear Information System (INIS)

    Snow, E.C.

    1975-08-01

    In preparation for the Lincoln Laboratory's LES 8/9 space mission, a series of tests was performed to evaluate the nuclear safety capability of the Multi-Hundred Watt (MHW) Radioisotope Thermoelectric Generator (RTG) to be used to supply power for the satellite. One such safety test is Test No. S-6, Launch Pad Abort Sequential Test. The objective of this test was to subject the RTG and its components to the sequential environments characteristic of a catastrophic launch pad accident to evaluate their capability to contain the 238 PuO 2 fuel. This sequence of environments was to have consisted of the blast overpressure and fragments, followed by the fireball, low velocity impact on the launch pad, and solid propellant fire. The blast overpressure and fragments were subsequently eliminated from this sequence. The procedures and results of Phase II of Test S-6, Solid Propellant Fire are presented. In this phase of the test, a simulant Fuel Sphere Assembly (FSA) and a mockup of a damaged Heat Source Assembly (HSA) were subjected to single proximity solid propellant fires of approximately 10-min duration. Steel was introduced into both tests to simulate the effects of launch pad debris and the solid rocket motor (SRM) casing that might be present in the fire zone. (TFD)

  17. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-02-24

    Many gearboxes in wind turbines do not achieve their expected design life; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, increases the cost of wind energy. In 2007, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its goals are to understand the root causes of premature gearbox failures and to improve their reliability. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This report describes the recently completed tests of GRC Gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. The primary test objective was to measure the planetary load-sharing characteristics in the same conditions as the original GRC gearbox design. If the measured load-sharing characteristics are close to the design model, the projected improvement in planetary section fatigue life and the efficacy of preloaded TRBs in mitigating the planetary bearing fatigue failure mode will have been demonstrated. Detailed analysis of that test objective will be presented in subsequent publications.

  18. Production circulator fabrication and testing for core flow test loop. Final report, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    The performance testing of two production helium circulators utilizing gas film lubrication is described. These two centrifugal-type circulators plus an identical circulator prototype will be arranged in series to provide the helium flow requirements for the Core Flow Test Loop which is part of the Gas-Cooled Fast Breeder Reactor Program (GCFR) at the Oak Ridge National Laboratory. This report presents the results of the Phase III performance and supplemental tests, which were carried out by MTI during the period of December 18, 1980 through March 19, 1981. Specific test procedures are outlined and described, as are individual tests for measuring the performance of the circulators. Test data and run descriptions are presented.

  19. Production circulator fabrication and testing for core flow test loop. Final report, Phase III

    International Nuclear Information System (INIS)

    1981-05-01

    The performance testing of two production helium circulators utilizing gas film lubrication is described. These two centrifugal-type circulators plus an identical circulator prototype will be arranged in series to provide the helium flow requirements for the Core Flow Test Loop which is part of the Gas-Cooled Fast Breeder Reactor Program (GCFR) at the Oak Ridge National Laboratory. This report presents the results of the Phase III performance and supplemental tests, which were carried out by MTI during the period of December 18, 1980 through March 19, 1981. Specific test procedures are outlined and described, as are individual tests for measuring the performance of the circulators. Test data and run descriptions are presented

  20. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  1. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  2. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    Science.gov (United States)

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  3. Novel automatic phase lock determination for superconducting cavity tests at vertical test stand at RRCAT

    International Nuclear Information System (INIS)

    Singh, Kunver Adarsh Pratap; Mohania, Praveen; Rajput, Vikas; Baxy, Deodatta; Shrivastava, Purushottam

    2015-01-01

    RRCAT has developed a Vertical Test Stand (VTS) which is used to test the Nb superconducting cavities under cryogenic conditions. In the VTS, RF cavity is characterized for its quality factor variation vs the accelerating gradient. The RF system is an essential part of the VTS which is required to provide stable RF power to the cavity in terms of amplitude, frequency and phase. RF system of VTS consists of several modules including the LLRF system. The LLRF system consists of the 'Frequency Control Module' which controls the input frequency to the SCRF cavity. Due to high quality factor, bandwidth of the cavity is less than 1 Hz. Even slight mechanical vibrations (microphonics) causes change in cavity resonance frequency resulting in total reflection of incident power. A PLL based frequency tracking module has been used to track the resonant frequency of RF cavity. This module changes RF source frequency according to change in Cavity resonance frequency. A novel method using a LabView based computer program has been developed which changes the phase of input RF signal using IQ modulator and monitors the transmitted power, incident and reflected power. The program plots the graph between phase and ratio of transmitted power to incident/reflected power and gives optimum locking phase for operation which has resulted in significant saving in the overall process time for the tests of the cavities in VTS. (author)

  4. High Rate User Ka-Band Phased Array Antenna Test Results

    Science.gov (United States)

    Caroglanian, Armen; Perko, Kenneth; Seufert, Steve; Dod, Tom; Warshowsky, Jay; Day, John H. (Technical Monitor)

    2001-01-01

    The High Rate User Phased Array Antenna (HRUPAA) is a Ka-Band planar phased array designed by the Harris Corporation for the NASA Goddard Space Flight Center. The HRUPAA permits a satellite to downlink data either to a ground station or through the Tracking and Data Relay Satellite System (TDRSS). The HRUPAA is scanned electronically by ground station / user satellite command over a 120 degree cone angle. The phased array has the advantage of not imparting attitude disturbances to the user spacecraft. The 288-element transmit-only array has distributed RF amplifiers integrated behind each of the printed patch antenna elements. The array has 33 dBW EIRP and is left-hand circularly polarized. An engineering model of a partially populated array has been developed and delivered to NASA Goddard Space Flight Center. This report deals with the testing of the engineering model at the Goddard Antenna Range near-field and compact range facilities. The antenna specifications are described first, followed by the test plan and test results.

  5. Elemental Water Impact Test: Phase 3 Plunge Depth of a 36-Inch Aluminum Tank Head

    Science.gov (United States)

    Vassilakos, Gregory J.

    2014-01-01

    Spacecraft are being designed based on LS-DYNA water landing simulations. The Elemental Water Impact Test (EWIT) series was undertaken to assess the accuracy of LS-DYNA water impact simulations. Phase 3 featured a composite tank head that was tested at a range of heights to verify the ability to predict structural failure of composites. To support planning for Phase 3, a test series was conducted with an aluminum tank head dropped from heights of 2, 6, 10, and 12 feet to verify that the test article would not impact the bottom of the test pool. This report focuses on the comparisons of the measured plunge depths to LS-DYNA predictions. The results for the tank head model demonstrated the following. 1. LS-DYNA provides accurate predictions for peak accelerations. 2. LS-DYNA consistently under-predicts plunge depth. An allowance of at least 20% should be added to the LS-DYNA predictions. 3. The LS-DYNA predictions for plunge depth are relatively insensitive to the fluid-structure coupling stiffness.

  6. Test plan for evaluation of plasma melter technology for vitrification of high-sodium content low-level radioactive liquid wastes

    International Nuclear Information System (INIS)

    McLaughlin, D.F.; Lahoda, E.J.; Gass, W.R.; D'Amico, N.

    1994-01-01

    This document provides a test plan for the conduct of plasma arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384212] is the Westinghouse Science and Technology Center (WSTC) in Pittsburgh, PA. WSTC authors of the test plan are D. F. McLaughlin, E. J. Lahoda, W. R. Gass, and N. D'Amico. The WSTC Program Manager for this test is D. F. McLaughlin. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass frit with Hanford LLW Double-Shell Slurry Feed waste simulant in a plasma arc fired furnace

  7. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    Science.gov (United States)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  8. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  9. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  10. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    International Nuclear Information System (INIS)

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU

  11. Generating custom test plans for CASE{sup *}Dictionary 5.0

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, K.D. [Boeing Computer Services, Richland, WA (United States)

    1994-04-01

    Most database development organizations use a formal software development methodology that requires a certain amount of formal testing. The amount of formal testing that will be performed will vary from methodology to methodology and from site to site. If a very detailed formal test plan is required for each module in a system, the work involved to produce the test plan can be tedious and costly. After a system has been designed and developed using Oracle*CASE, there is much useful information in the CASE*Dictionary repository. If this information could be tied to specific test requirements, a test plan could be generated automatically, saving much time and resources. This paper shows how CASE*Dictionary can be used to store test plan information that can then be used to generate a specific test plan for each module based on it`s detailed data usage.

  12. Fireside corrosion testing of candidate superheater tube alloys, coatings, and claddings -- Phase 2 field testing

    Energy Technology Data Exchange (ETDEWEB)

    Blough, J.L. [Foster Wheeler Development Corp., Livingston, NJ (United States)

    1996-08-01

    In Phase 1 of this project, a variety of developmental and commercial tubing alloys and claddings was exposed to laboratory fireside corrosion testing simulating a superheater or reheater in a coal-fired boiler. Phase 2 (in situ testing) has exposed samples of 347, RA85H, HR3C, 253MA, Fe{sub 3}Al + 5Cr, 310 modified, NF 709, 690 clad, and 671 clad for over 10,000 hours to the actual operating conditions of a 250-MW coal-fired boiler. The samples were installed on air-cooled, retractable corrosion probes, installed in the reheater cavity, controlled to the operating metal temperatures of an existing and advanced-cycle, coal-fired boiler. Samples of each alloy are being exposed for 4,000, 12,000, and 16,000 hours of operation. The present results are for the metallurgical examination of the corrosion probe samples after approximately 4,400 hours of exposure.

  13. 200-ZP-1 phase II and III IRM groundwater pump and treat site safety plan

    International Nuclear Information System (INIS)

    St. John, C.H.

    1996-07-01

    This safety plan covers operations, maintenance, and support activities related to the 200-ZP-1 Phase II and III Ground Water Pump- and-Treat Facility. The purpose of the facility is to extract carbon tetrachloride contaminated groundwater underlying the ZP-1 Operable Unit; separate the contaminant from the groundwater; and reintroduce the treated water to the aquifer. An air stripping methodology is employed to convert volatile organics to a vapor phase for absorption onto granular activated carbon. The automated process incorporates a variety of process and safety features that shut down the process system in the event that process or safety parameters are exceeded or compromised

  14. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  15. Test plan for long-term, low-temperature oxidation of spent fuel, Series 1

    International Nuclear Information System (INIS)

    Einziger, R.E.

    1986-06-01

    Preliminary studies indicated the need for more spent fuel oxidation data in order to determine the probable behavior of spent fuel in a tuff repository. Long-term, low-temperature testing was recommended in a comprehensive technical approach to: (1) confirm the findings of the short-term thermogravimetric analyses scoping experiments; (2) evaluate the effects of variables such as burnup, atmospheric moisture and fuel type on the oxidation rate; and (3) extend the oxidation data base ot representative repository temperatures and better define the temperature dependence of the operative oxidation mechanisms. This document presents the Series 1 test plan to study, on a large number of samples, the effects of atmospheric moisture and temperature on oxidation rate and phase formation. Tests will run for up to two years, use characterized fragmented, and pulverized fuel samples, cover a temperature range of 110 0 C to 175 0 C and be conducted with an atmospheric moisture content rangeing from 0 C to approx. 80 0 C dew point. After testing, the samples will be examined and made available for leaching testing

  16. A test plan for an on-line whole building energy calculator

    Energy Technology Data Exchange (ETDEWEB)

    Purdy, J.; Ferguson, A.; Mombourquette, S.; Haddad, K.; Lopez, P.; Wyndham-Wheeler, P.; Henry, S. [CANMET Energy Technology Centre, Natural Resources, Ottawa, Ont. (Canada)

    2008-04-15

    This paper presents the testing of a dynamic on-line whole-building energy calculator. The tool consists of a web-based interface for user inputs; an application to create the simulation input files from these user inputs; a simulation engine; and an application for passing the simulation engine output back to the interface and user. A detailed test protocol, composed of three parts, was developed as part of the software development process for quality assurance purposes. This paper will present the tasks specific to the development of the simulation engine, including, the definition of the required user inputs, the creation of default house archetypes, and the definition of the results to be presented to the user. It will also investigate the three parts of the test plan as well as the task automation tools developed to facilitate the testing. The use of these tools proved very useful given the large number of combinations of user inputs at the web interface and input files to the simulation engine. The findings show the importance of having a detailed and comprehensive test protocol during the software development phase. (author)

  17. The Unified Language Testing Plan: Speaking Proficiency Test. Spanish and English Pilot Validation Studies. Report Number 1.

    Science.gov (United States)

    Thornton, Julie A.

    This report describes one segment of the Federal Language Testing Board's Unified Language Testing Plan (ULTP), the validation of speaking proficiency tests in Spanish and English. The ULTP is a project to increase standardization of foreign language proficiency measurement and promote sharing of resources among testing programs in the federal…

  18. Mitigation of Tank 241-SY-101 by pump mixing: Results of testing phases A and B

    Energy Technology Data Exchange (ETDEWEB)

    Allemann, R.T.; Antoniak, Z.I.; Chvala, W.D.; Friley, J.R.; Gregory, W.B.; Hudson, J.D.; Michener, T.E.; Panisko, F.E.; Stewart, C.W.; Wise, B.M. [Pacific Northwest Lab., Richland, WA (United States); Efferding, L.E.; Fadeff, J.G.; Irwin, J.J.; Kirch, N.W. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-03-01

    A spare mixing pump from the Hanford Grout Program was installed in Hanford double-shell waste Tank 241-SY-101 on July 3, 1993, after being modified to take advantage of waste stratification. It was anticipated that pump mixing would prevent large episodic flammable gas releases that had been occurring about every 100-150 days. A cautious initial test plan, called Phase A, was run to find how the pump and tank would behave in response to very brief and gentle pump operation. No large gas releases were triggered, and the pump performed well except for two incidents of nozzle plugging. On October 21, 1993, the next test series, Phase B, began, and the pump was applied more aggressively to mix the tank contents and mitigate uncontrolled gas releases. Orienting the pump in new directions released large volumes of gas and reduced the waste level to a near-record low. Results of the entire period from pump installation to the end of Phase B on December 17, 1993, are presented in detail in this document. Though long-term effects require further evaluation, we conclude from these data that the jet mixer pump is an effective means of controlling flammable gas release and that it has met the success criteria for mitigation in this tank.

  19. Optimized FFTF Acceptance Test Program covering Phases III, IV, and V

    International Nuclear Information System (INIS)

    Wykoff, W.R.; Jones, D.H.

    1977-03-01

    A detailed review of Phases III, IV, and V of the FFTF Acceptance Test Program has been completed. The purpose of this review was to formulate that test sequence which not only meets requirements for safe, reliable and useful operation of the plant, but also results in the earliest prudent demonstration of full-power performance. A test sequence based on the underlying assumption that sodium flows into the secondary sodium storage tank (T-44) no later than August 31, 1978, is described in detail. A time-scale which allows extra time to put systems and equipment into operation the first time, debugging, and learning how to operate most effectively has been superimposed on the test sequence. Time is not included for major equipment malfunctions. This test plan provides the basis for coordinating the many and varied activities and interfaces necessary for successful and timely execution of the FFTF Acceptance Test Program. In this report, the need dates have been identified for presently scheduled test articles and standard core components

  20. Windows Calorimeter Control (WinCal) program computer software test plan

    International Nuclear Information System (INIS)

    Pertzborn, N.F.

    1997-01-01

    This document provides the information and guidelines necessary to conduct all the required testing of the Windows Calorimeter Control (WinCal) system. The strategy and essential components for testing the WinCal System Project are described in this test plan. The purpose of this test plan is to provide the customer and performing organizations with specific procedures for testing the specified system's functions

  1. Towards More Nuanced Classification of NGOs and Their Services to Improve Integrated Planning across Disaster Phases

    Directory of Open Access Journals (Sweden)

    Vivian L. Towe

    2017-11-01

    Full Text Available Nongovernmental organizations (NGOs are being integrated into U.S. strategies to expand the services that are available during health security threats like disasters. Identifying better ways to classify NGOs and their services could optimize disaster planning. We surveyed NGOs about the types of services they provided during different disaster phases. Survey responses were used to categorize NGO services as core—critical to fulfilling their organizational mission—or adaptive—services implemented during a disaster based on community need. We also classified NGOs as being core or adaptive types of organizations by calculating the percentage of each NGO’s services classified as core. Service types classified as core were mainly social services, while adaptive service types were those typically relied upon during disasters (e.g., warehousing, food services, etc.. In total, 120 NGOs were classified as core organizations, meaning they mainly provided the same services across disaster phases, while 100 NGOs were adaptive organizations, meaning their services changed. Adaptive NGOs were eight times more likely to report routinely participating in disaster planning as compared to core NGOs. One reason for this association may be that adaptive NGOs are more aware of the changing needs in their communities across disaster phases because of their involvement in disaster planning.

  2. A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism

    NARCIS (Netherlands)

    van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H G; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  3. A test of motor (not executive) planning in developmental coordination disorder and autism

    NARCIS (Netherlands)

    van Swieten, L.M.; van Bergen, E.; Williams, J.H.G.; Wilson, A.D.; Plumb, M.S.; Kent, S.W.; Mon-Williams, M.A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  4. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  5. Standard review plan for the review and evaluation of emergency plans for research and test reactors. Technical report

    International Nuclear Information System (INIS)

    Bates, E.F.; Grimes, B.K.; Ramos, S.L.

    1982-05-01

    This document provides a Standard Review Plan for the guidance of the NRC staff to assure that complete and uniform reviews are made of research and test reactor emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in Draft II of ANSI/ANS 15.16 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix

  6. Development of a Ground Test and Analysis Protocol to Support NASA's NextSTEP Phase 2 Habitation Concepts

    Science.gov (United States)

    Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Gernhardt, Michael L.

    2018-01-01

    The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.

  7. Test plan for glove box testing with the real-time transuranic dust monitor

    International Nuclear Information System (INIS)

    Partin, J.K.; Fincke, J.R.

    1994-10-01

    This test plan describes the objectives, instrumentation, and testing procedures used to prove the feasibility of a real-time transuranic dust monitor (RTDM). The RTDM is under development at the Idaho National Engineering Laboratory (INEL) as a Waste Characterization Technology funded by the Buried Waste Integrated Demonstration Project. The instrument is an in situ monitor that uses optical techniques to establish particle size, particle number density, and mass and species of heavy metal contamination. US Department of Energy orders mandate the assessment of radiological exposure and contamination spread during the remediation of radioactive waste. Of particular concern is heavy metal contamination of dust, both radioactive and nonradioactive. Small particles of metal, particularly the radioactive species, tend to become electrically charged and consequently attach themselves to dust particles. This airborne activated dust is a primary means of contamination transport during remediation activities, and therefore, must be continuously monitored to protect personnel involved in the operations and to control the spread of contamination. If real-time monitoring is not available there is increased likelihood of generating unacceptably high levels of contamination and being forced to shut down costly retrieval operations to decontaminate. A series of experiments are described to determine the optimal experimental design, operational parameters, and levels of detection for the RTDM. Initial screening will be performed using monodisperse particle standards to set parameters and calibrate the instrument. Additional testing will be performed using INEL soil samples spiked with a surrogate, cerium oxide, to prove the design before transporting the apparatus to the Test Reactor Area for testing with plutonium-contaminated dusts

  8. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    Energy Technology Data Exchange (ETDEWEB)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel; Sorensen, James; Pekot, Lawrence; Peck, Wesley; Jacobson, Lonny; Bosshart, Nicholas; Hurley, John; Wilson, William; Kurz, Marc; Burnison, Shaughn; Salako, Olarinre; Musich, Mark; Botnen, Barry; Kalenze, Nicholas; Ayash, Scott; Ge, Jun; Jiang, Tao; Dalkhaa, Chantsalmaa; Oster, Benjamin; Peterson, Kyle; Feole, Ian; Gorecki, Charles; Steadman, Edward

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed

  9. Test plan for in situ stress measurement system development

    International Nuclear Information System (INIS)

    Kim, K.

    1981-09-01

    The tests are to be performed to provide information regarding the state of stress of the basalt rock beneath the Hanford Site. This test series is designed to obtain information necessary to determine if hydrofracturing stress measurement is feasible in a fractured basalt medium. During the course of these field tests, it will be attempted to adapt the conventional hydrofracturing test method and analysis techniques to the basalt medium. If the test is shown to be feasible, more holes will be identified for testing. A comprehensive in situ stress determination program will be initiated. 2 figs

  10. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    Science.gov (United States)

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the

  11. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  12. Hawaiian Electric Advanced Inverter Test Plan - Result Summary

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, Anderson; Nelson, Austin; Prabakar, Kumaraguru; Nagarajan, Adarsh

    2016-10-14

    This presentation is intended to share the results of lab testing of five PV inverters with the Hawaiian Electric Companies and other stakeholders and interested parties. The tests included baseline testing of advanced inverter grid support functions, as well as distribution circuit-level tests to examine the impact of the PV inverters on simulated distribution feeders using power hardware-in-the-loop (PHIL) techniques. hardware-in-the-loop (PHIL) techniques.

  13. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    International Nuclear Information System (INIS)

    1985-01-01

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure

  14. Planned Hypothesis Tests Are Not Necessarily Exempt from Multiplicity Adjustment

    Science.gov (United States)

    Frane, Andrew V.

    2015-01-01

    Scientific research often involves testing more than one hypothesis at a time, which can inflate the probability that a Type I error (false discovery) will occur. To prevent this Type I error inflation, adjustments can be made to the testing procedure that compensate for the number of tests. Yet many researchers believe that such adjustments are…

  15. Test plan for the irradiation of nonmetallic materials.

    Energy Technology Data Exchange (ETDEWEB)

    Brush, Laurence H.; Farnum, Cathy Ottinger; Gelbard, Fred; Dahl, M.; Joslyn, C. C.; Venetz, T. J.

    2013-03-01

    A comprehensive test program to evaluate nonmetallic materials use in the Hanford Tank Farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

  16. Test plan for the irradiation of nonmetallic materials.

    Energy Technology Data Exchange (ETDEWEB)

    Brush, Laurence H.; Farnum, Cathy Ottinger; Dahl, M.; Joslyn, C. C.; Venetz, T. J.

    2013-05-01

    A comprehensive test program to evaluate nonmetallic materials use in the Hanford tank farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

  17. 10 CFR Appendix A to Subpart U of... - Sampling Plan for Enforcement Testing of Electric Motors

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing of Electric Motors A Appendix A to Subpart U of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY... to Subpart U of Part 431—Sampling Plan for Enforcement Testing of Electric Motors Step 1. The first...

  18. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  19. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  20. Sampling and analysis plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study, and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that impact ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of media testing. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetlands. This plan will be implemented as part of the BCV Phase II Treatability Study Best Management Practices Plan and in conjunction with the BCV Phase II Treatability Study Health and Safety Plan and the BCV Phase II Treatability Study Waste Management Plan

  1. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, Ron [National Renewable Energy Lab. (NREL), Golden, CO (United States; Polly, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States; Bianchi, Marcus [National Renewable Energy Lab. (NREL), Golden, CO (United States; Neymark, Joel [J. Neymark & Associates, Golden, CO (United States)

    2010-08-01

    This report documents the initial Phase 1 test process for testing the reliability of software models that predict retrofit energy savings of existing homes, including their associated calibration methods.

  2. In Situ Vitrification Engineering-Scale Test ES-INEL-4 Product Characterization Test Plan

    International Nuclear Information System (INIS)

    Weidner, J.R.; Stoots, P.R.

    1990-06-01

    In 1987, the Buried Waste Program (BWP) was established within EG ampersand G Idaho, Inc., the prime contractor at INEL. Following the Environmental Restoration guidelines of the Buried Waste Program, the In Situ Vitrification Program is participating in a Remedial Investigation/Feasibility Study (RI/FS) for permanent disposal of INEL waste, in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This study was requested and is being funded by the Office of Technology Development of the Idaho Operations Office of DOE (DOE-ID). As part of the RI/FS, an in situ vitrification (ISV) scoping study on the treatability of mixed low-level and mixed transuranic-contaminated waste is being performed to determine the applicability of ISV to remediation of waste at SDA. In examination of the ISV process for applicability to SDA waste, this In Situ Vitrification Engineering-Scale Test ES-INEL-4 Product Characterization Test Plan identifies the following: sampling and analysis strategy; sampling procedures; methods to conduct analyses; equipment; and procedures to ensure data quality. 8 refs., 2 tabs

  3. Underground test area subproject waste management plan. Revision No. 1

    International Nuclear Information System (INIS)

    1996-08-01

    The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS

  4. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  5. Atmospheric muons in the NEMO Phase 1 detector at the Catania test site

    International Nuclear Information System (INIS)

    Margiotta, Annarita

    2006-01-01

    The NEMO Collaboration is involved in a long term R and D activity towards the construction of a km 3 telescope in the Mediterranean sea. It has dedicated special efforts in the development of technologies for a km 3 detector and in the search, characterization and monitoring of a deep sea site adequate for the installation of the Mediterranean km 3 . Now the NEMO Collaboration is involved in the Phase 1 of the project, planning to install a fully equipped deep-sea facility to test prototypes and develop new technologies for the detector. A full Monte Carlo simulation has been performed to analyse the response of a reduced-size detector to the passage of atmospheric muons. Preliminary steps of the simulation are presented in this work

  6. In situ vitrification engineering-scale test ES-INEL-5 test plan

    International Nuclear Information System (INIS)

    Stoots, P.R.

    1990-06-01

    In 1952, the Radioactive Waste Management Complex (RWMC) was established at the Idaho National Engineering Laboratory (INEL). RWMC is located on approximately 144 acres in the southwestern corner of the INEL site and was established as a controlled area for the burial of solid low-level wastes generated by INEL operations. In 1954, the 88-acre Subsurface Disposal Area (SDA) of RWMC began accepting solid transuranic-contaminated waste. From 1954 to 1970, transuranic-contaminated waste was accepted from the Rocky Flats Plant (RFP) near Golden, CO, as well as from other US Department of Energy (DOE) locations. In 1987, the Buried Waste Program (BWP) was established by EG ampersand G Idaho, Inc., the prime contractor at INEL. Following the Environmental Restoration guidelines of the Buried Waste Program, the In Situ Vitrification Program is participating in a Remedial Investigation/Feasibility Study (RI/FS) for permanent disposal of INEL waste, in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This study was requested and is being funded by the Office of Technology Development of the Idaho Operations Office of DOE (DOE-ID). As part of the RI/FS, an in situ vitrification (ISV) scoping study on the treatability of mixed low-level and mixed transuranic-contaminated waste is being performed to determine applicability of ISV to remediation of waste at SDA. This In Situ Vitrification Engineering-Scale Test ES-INEL-5 Test Plan considers the data needs of engineering, regulatory, health, and safety activities for all sampling and analysis activities in support of engineering scale test ES-INEL-5. 5 refs., 3 figs., 4 tabs

  7. Plan for dynamic testing of NFS tank and vault

    International Nuclear Information System (INIS)

    1977-12-01

    (Nuclear Fuel Services) dynamic testing methodologies are described including the determination of resonant frequencies, mode shapes and the associated structural damping. The application of dynamic testing to the determination of the eigenparameters of the neutralized waste tanks 8D-2 and 8D-1 investigated and recommendations made

  8. Planned Hypothesis Tests Are Not Necessarily Exempt From Multiplicity Adjustment

    Directory of Open Access Journals (Sweden)

    Andrew V. Frane

    2015-10-01

    Full Text Available Scientific research often involves testing more than one hypothesis at a time, which can inflate the probability that a Type I error (false discovery will occur. To prevent this Type I error inflation, adjustments can be made to the testing procedure that compensate for the number of tests. Yet many researchers believe that such adjustments are inherently unnecessary if the tests were “planned” (i.e., if the hypotheses were specified before the study began. This longstanding misconception continues to be perpetuated in textbooks and continues to be cited in journal articles to justify disregard for Type I error inflation. I critically evaluate this myth and examine its rationales and variations. To emphasize the myth’s prevalence and relevance in current research practice, I provide examples from popular textbooks and from recent literature. I also make recommendations for improving research practice and pedagogy regarding this problem and regarding multiple testing in general.

  9. Fireside corrosion testing of candidate superheater tube alloys, coatings, and claddings -- Phase 2 field testing

    Energy Technology Data Exchange (ETDEWEB)

    Blough, J.L.; Seitz, W.W.; Girshik, A. [Foster Wheeler Development Corp., Livingston, NJ (United States)

    1998-06-01

    In Phase 1 of this project, laboratory experiments were performed on a variety of developmental and commercial tubing alloys and claddings by exposing them to fireside corrosion tests which simulated a superheater or reheater in a coal-fired boiler. Phase 2 (in situ testing) has exposed samples of 347, RA85H, HR3C, RA253MA, Fe{sub 3}Al + 5Cr, Ta-modified 310, NF 709, 690 clad, 671 clad, and 800HT for up to approximately 16,000 hours to the actual operating conditions of a 250-MW, coal-fired boiler. The samples were installed on air-cooled, retractable corrosion probes, installed in the reheater cavity, and controlled to the operating metal temperatures of an existing and advanced-cycle, coal-fired boiler. Samples of each alloy were exposed for 4,483, 11,348, and 15,883 hours of operation. The present results are for the metallurgical examination of the corrosion probe samples after the full 15,883 hours of exposure. A previous topical report has been issued for the 4,483 hours of exposure.

  10. Groundwater movements around a repository. Phase 1, State of the art and detailed study plan

    International Nuclear Information System (INIS)

    Lindblom, U.

    1977-02-01

    The report was prepared as the first phase of a study of the groundwater movements around a repository for spent nuclear fuel in the precambrian bedrock of Sweden. The objectives of these studies are to provide a state of the art review of groundwater slow in the region of a repository in granitic rock, in order to provide a basis for long term containment assessments and to prepare a detailed study plan for the continuation of the project. The different processes affecting the groundwater situation for containment are given. A state of the art review of the fluid flow, geochemical, heat transfer and rock mechanics processes as they relate to containment is presented. A detailed study plan to provide a comprehensive assessment of the hydrogeological regime around the repository during its lifetime is also presented. The groundwater flow fields will provide a basis for subsequent long term containment studies. (L.B.)

  11. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  12. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  13. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  14. Vadose zone transport field study: Detailed test plan for simulated leak tests

    International Nuclear Information System (INIS)

    AL Ward; GW Gee

    2000-01-01

    : identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project

  15. Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.; Keller, Daniel T.

    2015-09-16

    The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.

  16. Optimal integration and test plans for software releases of lithographic systems

    NARCIS (Netherlands)

    Boumen, R.; Jong, de I.S.M.; Mortel - Fronczak, van de J.M.; Rooda, J.E.

    2007-01-01

    This paper describes a method to determine the optimal integration and test plan for embedded systems software releases. The method consists of four steps: 1)describe the integration and test problem in an integration and test model which is introduced in this paper, 2) determine possible test

  17. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the

  18. TWRS privatization: Phase I monitoring well engineering study and decommissioning plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, B.A.

    1996-09-11

    This engineering study evaluates all well owners and users, the status or intended use of each well, regulatory programs, and any future well needs or special purpose use for wells within the TWRS Privatization Phase I demonstration area. Based on the evaluation, the study recommends retaining 11 of the 21 total wells within the demonstration area and decommissioning four wells prior to construction activities per the Well Decommissioning Plan (WHC-SD-EN-AP-161, Rev. 0, Appendix I). Six wells were previously decommissioned.

  19. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  20. Single-shell tank riser resistance to ground test plan

    International Nuclear Information System (INIS)

    Kiewert, L.R.

    1996-01-01

    This Test Procedure provides the general directions for conducting Single-Shell Tank Riser to Earth Measurements which will be used by engineering as a step towards providing closure for the Lightning Hazard Issue

  1. Joint test rig for tests and calibration of different methods of two-phase mass flow measurement

    International Nuclear Information System (INIS)

    John, H.; Erbacher, F.; Wanner, E.

    1975-01-01

    On behalf of the Federal Ministry of Research and Technology, the Institute of Reactor Components (IRB) has begun building a test rig which will be used for testing and calibrating the methods of measuring non-steady state two-phase mass flows developed by various research agencies. The test rig is designed for the generation of steam-water mixtures of any mixing ratio and a maximum pressure of 160 data. Depending on the mixing ratio, the mass flow will reach a maximum level of 10 to 20 t/h. The conceptual design phase of the test rig has largely been finished, the component ordering phase has begun. (orig.) [de

  2. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  3. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  4. Nevada Test Site, site treatment plan 1999 annual update

    International Nuclear Information System (INIS)

    1999-03-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  5. T Tank Farm Interim Cover Test - Design Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  6. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  7. Hydrologic test plans for large-scale, multiple-well tests in support of site characterization at Hanford, Washington

    International Nuclear Information System (INIS)

    Rogers, P.M.; Stone, R.; Lu, A.H.

    1985-01-01

    The Basalt Waste Isolation Project is preparing plans for tests and has begun work on some tests that will provide the data necessary for the hydrogeologic characterization of a site located on a United States government reservation at Hanford, Washington. This site is being considered for the Nation's first geologic repository of high level nuclear waste. Hydrogeologic characterization of this site requires several lines of investigation which include: surface-based small-scale tests, testing performed at depth from an exploratory shaft, geochemistry investigations, regional studies, and site-specific investigations using large-scale, multiple-well hydraulic tests. The large-scale multiple-well tests are planned for several locations in and around the site. These tests are being designed to provide estimates of hydraulic parameter values of the geologic media, chemical properties of the groundwater, and hydrogeologic boundary conditions at a scale appropriate for evaluating repository performance with respect to potential radionuclide transport

  8. Irradiation test plan of the simulated DUPIC fuel

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Ki Kwang; Yang, M. S.; Kim, B. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-11-01

    Simulated DUPIC fuel had been irradiated from Aug. 4, 1999 to Oct. 4 1999, in order to produce the data of its in-core behavior, to verify the design of DUPIC non-instrumented capsule developed, and to ensure the irradiation requirements of DUPIC fuel at HANARO. The welding process was certified for manufacturing the mini-element, and simulated DUPIC fuel rods were manufactured with simulated DUPIC pellets through examination and test. The non-instrumented capsule for a irradiation test of DUPIC fuel has been designed and manufactured referring to the design specification of the HANARO fuel. This is to be the design basis of the instrumented capsule under consideration. The verification experiment, whether the capsule loaded in the OR4 hole meet the HANARO requirements under the normal operation condition, as well as the structural analysis was carried out. The items for this experiment were the pressure drop test, vibration test, integrity test, et. al. It was noted that each experimental result meet the HANARO operational requirements. For the safety analysis of the DUPIC non-instrumented capsule loaded in the HANARO core, the nuclear/mechanical compatibility, thermodynamic compatibility, integrity analysis of the irradiation samples according to the reactor condition as well as the safety analysis of the HANARO were performed. Besides, the core reactivity effects were discussed during the irradiation test of the DUPIC capsule. The average power of each fuel rod in the DUPIC capsule was calculated, and maximal linear power reflecting the axial peaking power factor from the MCNP results was evaluated. From these calculation results, the HANARO core safety was evaluated. At the end of this report, similar overseas cases were introduced. 9 refs., 16 figs., 10 tabs. (Author)

  9. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  10. Test plan for tank 241-AN-104 dilution studies

    International Nuclear Information System (INIS)

    Herting, D.L.

    1998-01-01

    Tank 241-AN-104 (104-AN) has been identified as the one of the first tanks to be retrieved for low level waste pretreatment and immobilization. Retrieval of the tank waste will require dilution. Laboratory tests are needed to determine the amount and type of dilution required for safe retrieval and transfer of feed and to re-dissolve major soluble sodium salts while not precipitating out other salts. The proposed laboratory tests are described in this document. Tank 241-AN-104 is on the Hydrogen Watch List

  11. DOE standard: Filter test facility quality program plan

    International Nuclear Information System (INIS)

    1999-02-01

    This standard was developed primarily for application in US Department of Energy programs. It contains specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF). Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should be sent to the Office of Nuclear Safety Policy and Standards (EH-31), US Department of Energy, Washington, DC 20585, by letter or by using the self-addressed Document Improvement Proposal form (DOE F 1300.3) appearing at the end of this document

  12. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Energy Systems to prepare a Phase II Sampling Plan to describe the field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of the Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to the applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures

  13. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  14. Evaluating and planning the radioactive waste options for dismantling the Tokamak Fusion Test Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Rule, K.; Scott, J.; Larson, S. [Princeton Plasma Physics Lab., NJ (United States)] [and others

    1995-12-31

    The Tokamak Fusion Test Reactor (TFTR) is a one-of-a kind tritium fusion research reactor, and is planned to be decommissioned within the next several years. This is the largest fusion reactor in the world and as a result of deuterium-tritum reactions is tritium contaminated and activated from 14 Mev neutrons. This presents many unusual challenges when dismantling, packaging and disposing its components and ancillary systems. Special containers are being designed to accommodate the vacuum vessel, neutral beams, and tritium delivery and processing systems. A team of experienced professionals performed a detailed field study to evaluate the requirements and appropriate methods for packaging the radioactive materials. This team focused on several current and innovative methods for waste minimization that provides the oppurtunmost cost effective manner to package and dispose of the waste. This study also produces a functional time-phased schedule which conjoins the waste volume, weight, costs and container requirements with the detailed project activity schedule for the entire project scope. This study and project will be the first demonstration of the decommissioning of a tritium fusion test reactor. The radioactive waste disposal aspects of this project are instrumental in demonstrating the viability of a fusion power reactor with regard to its environmental impact and ultimate success.

  15. Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Davinia [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Blackburn, Mark [Stevens Inst. of Technology, Hoboken, NJ (United States)

    2017-03-01

    Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper covers the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).

  16. Stennis Holds Last Planned Space Shuttle Engine Test

    Science.gov (United States)

    2009-01-01

    With 520 seconds of shake, rattle and roar on July 29, 2009 NASA's John C. Stennis Space Center marked the end of an era for testing the space shuttle main engines that have powered the nation's Space Shuttle Program for nearly three decades.

  17. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  18. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    International Nuclear Information System (INIS)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-01-01

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public

  19. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  20. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  1. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  2. Horonobe Underground Research Laboratory project. Plans of investigations during shaft and drift excavation (Construction of underground facilities: Phase II)

    International Nuclear Information System (INIS)

    2005-06-01

    Horonobe Underground Research Laboratory Project is planned for over 20 years to establish the scientific and technical basis for the underground disposal of high-level radioactive wastes in Japan. The investigations are conducted by JNC in three phases, from the surface (Phase I), during the construction of the underground facilities (Phase II), and using the facilities (Phase III). This report concerns the investigation plans for Phase II. During excavation of shafts and drifts, detailed geological and borehole investigation will be conducted and the geological model constructed in Phase I is evaluated and revised by newly acquired data of geophysical and geological environment. Detailed in-situ experiments, as well as the effects of shaft excavation, are also done to study long-term changes, rock properties, groundwater flow and chemistry to ensure the reliability of repository technology and establish safety assessment methodology. (S. Ohno)

  3. Out-pile test plan for lifetime extension of shutoff units in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Joe, Y. G.; Lee, J. H.; Jeong, Y. H.; Woo, S. I.; Ryu, J. S.; Kim, Y. G.; Park, Y. C.; Kim, H. G.; Woo, J. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    It is estimated that the number of drops of shutoff rods in HANARO will reach the endurance verified numbers before the end of the reactor life. To resolve this situation, we have a plan to prepare of a new spare unit by the performance verification test for the local product, and extend the lifetime of shutoff units installed in the reactor by performing an additional endurance test in the out-pile test facility using an existing spare unit. This paper describes the overall situations and test plan for the out-pile test to extend the lifetime extension of shutoff unit.

  4. NREL Next Generation Drivetrain: Mechanical Design and Test Plan (Poster)

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.; Halse, C.

    2014-05-01

    The Department of Energy and industry partners are sponsoring a $3m project for design and testing of a 'Next Generation' wind turbine drivetrain at the National Renewable Energy Laboratory (NREL). This poster focuses on innovative aspects of the gearbox design, completed as part of an end-to-end systems engineering approach incorporating innovations that increase drivetrain reliability, efficiency, torque density and minimize capital cost.

  5. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  6. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  7. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  8. HTTR demonstration test plan for industrial utilization of nuclear heat

    International Nuclear Information System (INIS)

    Sato, Hiroyuki; Ohashi, Hirofumi; Yan, Xing L.; Kubo, Shinji; Nishihara, Tetsuo; Tachibana, Yukio; Inagaki, Yoshiyuki

    2014-09-01

    Japan Atomic Energy Agency has been conducting research and development with a central focus on the utilization of High Temperature engineering Test Reactor (HTTR), the first High Temperature Gas-cooled Reactor (HTGR) in Japan, towards the realization of industrial use of nuclear heat. Several studies have made on the integration of the HTTR with thermochemical iodine-sulfur process and steam methane reforming hydrogen production plant (H 2 plant) as well as helium gas turbine power conversion system. In addition, safety standards for coupling a H 2 plant to a nuclear facility has been investigated. Based on the past design information, the present study identified test items to be validated in the HTTR demonstration test to accomplish a formulation of safety requirement and design consideration for coupling a H 2 plant to a nuclear facility as well as confirmation of overall performance of helium gas turbine system. In addition, plant concepts for the heat utilization system to be connected with the HTTR are investigated. (author)

  9. Digital Resource Exchange About Music (DREAM): Phase 2 Usability Testing

    Science.gov (United States)

    Upitis, Rena; Boese, Karen; Abrami, Philip C.; Anwar, Zaeem

    2015-01-01

    The Digital Resource Exchange About Music (DREAM) is a virtual space for exchanging information about digital learning tools. The purpose of the present study was to determine how users responded to DREAM in the first four months after its public release. This study is the second phase of usability research on DREAM, and was conducted to guide…

  10. Task plan for test of PRBT prototypic liquid sampler

    International Nuclear Information System (INIS)

    Jenkins, W.J.

    1992-01-01

    The primary objective of this task is to determine just how representative Precipitate Reactor Bottom Tank (PRBT) samples taken from the Hydragard trademark prototypic liquid sampler are of the in-tank contents and also to determine the homogeneity of the in-tank contents. This shall be accomplished by a statistical design study sampling plan for paired contrasts of the analysis results of samples taken from: (1) the Hydragard trademark prototypic liquid sampler paired with the more fundamental grab sampler at the lower elevation for the Hydragard trademark prototypic liquid sampler accuracy and (2) the grab sampler at the lower elevation paired with the grab sampler at the upper elevation for the in-tank homogeneity. These measurements are paired together to sharpen the contrast so that, as nearly as possible, only the conditions of the effect under study will differ between the two. This ''split-plot'' arrangement provides increased precision for the contrast under study by canceling out common extraneous effects, thereby enabling the detection of smaller effects. The secondary objective of the task is to determine the level of influence of the major contributors to the overall uncertainty in the sample preparation and measurement process. These major steps include: preparation method (H 2 SO 4 -HF Titanium dissolution); aliquoting and dilution within a dissolution; measurement and long-term behavior of the ICP and AA instruments, as monitored by the measurement of standards and blanks embedded within each block of samples for the measurement sequence. This sampling task, therefore, is mostly devoted to determining the sampler characteristics and is not intended to provide a comprehensive estimate of the overall uncertainty affecting DWPF sample analysis in routine operation

  11. Challenges Facing Early Phase Trials Sponsored by the National Cancer Institute: An Analysis of Corrective Action Plans to Improve Accrual.

    Science.gov (United States)

    Massett, Holly A; Mishkin, Grace; Rubinstein, Larry; Ivy, S Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A; Abrams, Jeffrey S

    2016-11-15

    Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAP) received for slow-accruing phase I and II trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for phase I trials and 66 for phase II trials. Primary reasons cited for slow accrual were safety/toxicity (phase I: 48%), design/protocol concerns (phase I: 42%, phase II: 33%), and eligibility criteria (phase I: 41%, phase II: 35%). The most commonly proposed corrective actions were adding institutions (phase I: 43%, phase II: 85%) and amending the trial to change eligibility or design (phase I: 55%, phase II: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (phase I = 48; phase II = 46). Of these, 67% of phase I and 70% of phase II trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial life cycles, but it may be more beneficial to invest in earlier accrual planning. Clin Cancer Res; 22(22); 5408-16. ©2016 AACRSee related commentary by Mileham and Kim, p. 5397. ©2016 American Association for Cancer Research.

  12. Contribution of phased array technique to automation in ultrasonic testing

    International Nuclear Information System (INIS)

    Erhard, A.; Schenk, G.; Moehrle, W.; Wuestenberg, H.; Rathgeb, W.

    1989-01-01

    Ultrasonic tests on complicated geometries often require expensive manipulator technique. To guarantee certain information from tests, the control of the manipulator must be matched to the acoustic boundary conditions. In the past and today, complex manipulators were and are being developed and used with tests on such geometries. The results of the measurements with group radiator technique in the bottom hole area or on ducts, showed that the manipulators can be simplified, particularly with regard to their degrees of freedom, e.g.: doing without the axis of rotation to set the angle of squint in testing ducts, without thereby narrowing the test area. In the bottom hole test, it was found that by using the group radiator technique, the test area is expanded, evaluation is simplified and coupling can be ensured. (orig.) [de

  13. Large-Grain Superconducting Gun Cavity Testing Program Phase One Closing Report

    Energy Technology Data Exchange (ETDEWEB)

    Hammons, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Bellavia, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Belomestnykh, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ben-Zvi, I. [Brookhaven National Lab. (BNL), Upton, NY (United States); Cullen, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Dai, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Degen, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Hahn, H. [Brookhaven National Lab. (BNL), Upton, NY (United States); Masi, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); McIntyre, G. [Brookhaven National Lab. (BNL), Upton, NY (United States); Schultheiss, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Seda, T. [Brookhaven National Lab. (BNL), Upton, NY (United States); Kellerman, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tallerico, T. [Brookhaven National Lab. (BNL), Upton, NY (United States); Todd, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tuozzolo, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Xu, W. [Brookhaven National Lab. (BNL), Upton, NY (United States); Than, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2013-10-31

    This report details the experimental configuration and RF testing results for the first phase of a large-grained niobium electron gun cavity testing program being conducted in the Small Vertical Testing Facility in the Collider-Accelerator Department. This testing is meant to explore multi-pacting in the cavity and shed light on the behavior of a counterpart cavity of identical geometry installed in the Energy Recovery LINAC being constructed in the Collider-Accelerator Department at Brookhaven National Laboratory. This test found that the Q of the large-grained cavity at 4 K reached ~6.5 × 108 and at 2 K reached a value of ~6 × 109. Both of these values are about a factor of 10 lower than would be expected for this type of cavity given the calculated surface resistance and the estimated geometry factor for this half-cell cavity. In addition, the cavity reached a peak voltage of 0.6 MV before there was sig-nificant decline in the Q value and a substantial increase in field emission. This relatively low volt-age, coupled with the low Q and considerable field emission suggest contamination of the cavity interior, possibly during experimental assembly. The results may also suggest that additional chemical etching of the interior surface of the cavity may be beneficial. Throughout the course of testing, various challenges arose including slow helium transfer to the cryostat and cable difficulties. These difficulties and others were eventually resolved, and the re-port discusses the operating experience of the experiment thus far and the plans for future work aimed at exploring the nature of multipacting with a copper cathode inserted into the cavity.

  14. San Francisco urban partnership agreement, national evaluation : content analysis test plan.

    Science.gov (United States)

    2011-06-01

    This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, : and reactions of the public, policy makers, and other groups to the UPA projects for the San Francisco Urban : Partnership Agreement...

  15. San Francisco urban partnership agreement, national evaluation : exogenous factors test plan.

    Science.gov (United States)

    2011-06-01

    This report presents the test plan for collecting and analyzing exogenous factors data for the San Francisco Urban : Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. : The San Francisco UPA proj...

  16. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    Science.gov (United States)

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  17. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    Science.gov (United States)

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  18. Minnesota urban partnership agreement national evaluation : traffic system data test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...

  19. Minnesota urban partnership agreement national evaluation : transit system data test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...

  20. Minnesota urban partnership agreement national evaluation : surveys, interviews, and focus groups test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the test plan for developing, conducting, and analyzing surveys, interviews, and focus groups for evaluating the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Prog...

  1. Minnesota urban partnership agreement national evaluation : cost benefit analysis test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the cost benefit analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by emplo...

  2. Nuclear physics at PEP: First test and future plans

    International Nuclear Information System (INIS)

    Van Bibber, K.; Dietrich, F.S.; Melnikoff, S.O.

    1986-09-01

    A test run of internal target nuclear physics at the PEP storage ring is described. The Time Projection Chamber (TPC-2γ detector) was used to detect the inelastically scattered electron and complete hadronic final state in the interaction of 14.5 GeV electrons with D 2 , Ar and Xe gas targets. The data comprise mostly low-x low-Q 2 events, but some deep inelastic scattering as well. The future possibilities of a dedicated nuclear physics program at PEP are outlined. 15 refs., 25 figs

  3. Field Lysimeter Test Facility for protective barriers: Experimental plan

    International Nuclear Information System (INIS)

    Kirkham, R.R.; Gee, G.W.; Downs, J.L.

    1987-12-01

    This document was first written in October 1986 and has been used to guide the design of the Field Lysimeter Test Facility (FLTF) and to promote discussions between research and engineering staff regarding the selection of barrier treatments for inclusion in the FLTF. The construction of the lysimeter facility was completed June 28, 1987. This document describes the facility, the treatments placed in each lysimeter, types of measurements made in each lysimeter, and a brief discussion of project activities related to quality assurance, safety, and funding requirements. The treatment description and figures have been updated to reflect the lysimeter facility as constructed. 12 refs., 6 figs., 5 tabs

  4. Achievements and Future Plans of CLIC Test Facilities

    CERN Document Server

    Braun, Hans Heinrich

    2001-01-01

    CTF2 was originally designed to demonstrate the feasibility of two-beam acceleration with high current drive beams and a string of 30 GHz CLIC accelerating structure prototypes (CAS). This goal was achieved in 1999 and the facility has since been modified to focus on high gradient testing of CAS's and 30 GHz single cell cavities (SCC). With these modifications, it is now possible to provide 30 GHz RF pulses of more than 150 MW and an adjustable pulselength from 3 to 15 ns. While the SCC results are promising, the testing of CAS's revealed problems of RF breakdown and related surface damage. As a consequence, a new R&D program has been launched to advance the understanding of RF breakdown processes, to improve surface properties, investigate new materials and to optimise the structure geometries of the CAS's. In parallel the construction of a new facility named CTF3 has started. CTF3 will mainly serve two purposes. The first is the demonstration of the CLIC drive beam generation scheme. CTF3 will acceler-a...

  5. Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

    Science.gov (United States)

    Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan

    2016-01-01

    The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

  6. Continuous-Scan Phased Array Measurement Methods for Turbofan Engine Acoustic Testing, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — ATA Engineering, Inc., (ATA) proposes an SBIR project to advance the technology readiness level (TRL) of a method for measuring phased array acoustic data for...

  7. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks

    International Nuclear Information System (INIS)

    Douglas, D.G.; Maresca, J.W. Jr.

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC)

  8. Accelerated life testing effects on CMOS microcircuit characteristics, phase 1

    Science.gov (United States)

    Maximow, B.

    1976-01-01

    An accelerated life test of sufficient duration to generate a minimum of 50% cumulative failures in lots of CMOS devices was conducted to provide a basis for determining the consistency of activation energy at 250 C. An investigation was made to determine whether any thresholds were exceeded during the high temperature testing, which could trigger failure mechanisms unique to that temperature. The usefulness of the 250 C temperature test as a predictor of long term reliability was evaluated.

  9. Plenoptic Flow Imaging for Ground Testing, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Instantaneous volumetric flow imaging is crucial to aerodynamic development and testing. Simultaneous volumetric measurement of flow parameters enables accurate...

  10. Automated Test Case Generation from Highly Reliable System Requirements Models, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Software testing is a complex and expensive phase of the software development cycle. Effective software testing is especially important in mission-critical software,...

  11. Test plan for the Sample Transfer Canister system

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1998-01-01

    The Sample Transfer Canister will be used by the Waste Receiving and Processing Facility (WRAP) for the transport of small quantity liquid samples that meet the definition of a limited quantity radioactive material, and may also be corrosive and/or flammable. These samples will be packaged and shipped in accordance with the US Department of Transportation (DOT) regulation 49 CFR 173.4, ''Exceptions for small quantities.'' The Sample Transfer Canister is of a ''French Can'' design, intended to be mated with a glove box for loading/unloading. Transport will typically take place north of the Wye Barricade between WRAP and the 222-S Laboratory. The Sample Transfer Canister will be shipped in an insulated ice chest, but the ice chest will not be a part of the small quantity package during prototype testing

  12. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  13. Nuclear fuels technologies fiscal year 1998 research and development test plan

    International Nuclear Information System (INIS)

    Alberstein, D.; Blair, H.T.; Buksa, J.J.

    1998-06-01

    A number of research and development (R and D) activities are planned at Los Alamos National Laboratory (LANL) in FY98 in support of the Department of Energy Office of Fissile Materials Disposition (DOE-MD). During the past few years, the ability to fabricate mixed oxide (MOX) nuclear fuel using surplus-weapons plutonium has been researched, and various experiments have been performed. This research effort will be continued in FY98 to support further development of the technology required for MOX fuel fabrication for reactor-based plutonium disposition. R and D activities for FY98 have been divided into four major areas: (1) feed qualification/supply, (2) fuel fabrication development, (3) analytical methods development, and (4) gallium removal. Feed qualification and supply activities encompass those associated with the production of both PuO 2 and UO 2 feed materials. Fuel fabrication development efforts include studies with a new UO 2 feed material, alternate sources of PuO 2 , and determining the effects of gallium on the sintering process. The intent of analytical methods development is to upgrade and improve several analytical measurement techniques in support of other R and D and test fuel fabrication tasks. Finally, the purpose of the gallium removal system activity is to develop and integrate a gallium removal system into the Pit Disassembly and Conversion Facility (PDCF) design and the Phase 2 Advanced Recovery and Integrated Extraction System (ARIES) demonstration line. These four activities will be coordinated and integrated appropriately so that they benefit the Fissile Materials Disposition Program. This plan describes the activities that will occur in FY98 and presents the schedule and milestones for these activities

  14. Phase 1 Development Testing of the Advanced Manufacturing Demonstrator Engine

    Science.gov (United States)

    Case, Nicholas L.; Eddleman, David E.; Calvert, Marty R.; Bullard, David B.; Martin, Michael A.; Wall, Thomas R.

    2016-01-01

    The Additive Manufacturing Development Breadboard Engine (BBE) is a pressure-fed liquid oxygen/pump-fed liquid hydrogen (LOX/LH2) expander cycle engine that was built and operated by NASA at Marshall Space Flight Center's East Test Area. The breadboard engine was conceived as a technology demonstrator for the additive manufacturing technologies for an advanced upper stage prototype engine. The components tested on the breadboard engine included an ablative chamber, injector, main fuel valve, turbine bypass valve, a main oxidizer valve, a mixer and the fuel turbopump. All parts minus the ablative chamber were additively manufactured. The BBE was successfully hot fire tested seven times. Data collected from the test series will be used for follow on demonstration tests with a liquid oxygen turbopump and a regeneratively cooled chamber and nozzle.

  15. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  16. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  17. Hydraulic testing plan for the Bear Creek Valley Treatability Study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatability technologies applicable to contaminated groundwater and surface water. The ultimate goal of this effort is to install a treatment system that will remove uranium, technetium, nitrate, and several metals from groundwater before it reaches Bear Creek. This project directly supports the BCV Feasibility Study. Part of the Treatability Study, Phase II Hydraulic Performance Testing, will produce hydraulic and treatment performance data required to design a long-term treatment system. This effort consists of the installation and testing of two groundwater collection systems: a trench in the vicinity of GW-835 and an angled pumping well adjacent to NT-1. Pumping tests and evaluations of gradients under ambient conditions will provide data for full-scale design of treatment systems. In addition to hydraulic performance, in situ treatment chemistry data will be obtained from monitoring wells installed in the reactive media section of the trench. The in situ treatment work is not part of this test plan. This Hydraulic Testing Plan describes the location and installation of the trench and NT-1 wells, the locations and purpose of the monitoring wells, and the procedures for the pumping tests of the trench and NT-1 wells

  18. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  19. Electrodril system field test program. Phase II: Task C-1-deep drilling system demonstration. Final report for Phase II: Task C-1

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, P D

    1981-04-01

    The Electrodril Deep Drilling System field test demonstrations were aborted in July 1979, due to connector problems. Subsequent post test analyses concluded that the field replacable connectors were the probable cause of the problems encountered. The designs for both the male and female connectors, together with their manufacturing processes, were subsequently modified, as was the acceptance test procedures. A total of nine male and nine female connectors were manufactured and delivered during the 2nd Quarter 1980. Exhaustive testing was then conducted on each connector as a precursor to formal qualification testing conducted during the month of October 1980, at the Brown Oil Tool test facility located in Houston, Texas. With this report, requirements under Phase II, Task C-1 are satisfied. The report documents the results of the connector qualification test program which was successfully completed October 28, 1980. In general, it was concluded that connector qualification had been achieved and plans are now in progress to resume the field test demonstration program so that Electrodril System performance predictions and economic viability can be evaluated.

  20. Benchmark enclosure fire suppression experiments - phase 1 test report.

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, Victor G.; Nichols, Robert Thomas; Blanchat, Thomas K.

    2007-06-01

    A series of fire benchmark water suppression tests were performed that may provide guidance for dispersal systems for the protection of high value assets. The test results provide boundary and temporal data necessary for water spray suppression model development and validation. A review of fire suppression in presented for both gaseous suppression and water mist fire suppression. The experimental setup and procedure for gathering water suppression performance data are shown. Characteristics of the nozzles used in the testing are presented. Results of the experiments are discussed.