WorldWideScience

Sample records for test procedures prior

  1. Relations among conceptual knowledge, procedural knowledge, and procedural flexibility in two samples differing in prior knowledge.

    Science.gov (United States)

    Schneider, Michael; Rittle-Johnson, Bethany; Star, Jon R

    2011-11-01

    Competence in many domains rests on children developing conceptual and procedural knowledge, as well as procedural flexibility. However, research on the developmental relations between these different types of knowledge has yielded unclear results, in part because little attention has been paid to the validity of the measures or to the effects of prior knowledge on the relations. To overcome these problems, we modeled the three constructs in the domain of equation solving as latent factors and tested (a) whether the predictive relations between conceptual and procedural knowledge were bidirectional, (b) whether these interrelations were moderated by prior knowledge, and (c) how both constructs contributed to procedural flexibility. We analyzed data from 2 measurement points each from two samples (Ns = 228 and 304) of middle school students who differed in prior knowledge. Conceptual and procedural knowledge had stable bidirectional relations that were not moderated by prior knowledge. Both kinds of knowledge contributed independently to procedural flexibility. The results demonstrate how changes in complex knowledge structures contribute to competence development.

  2. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  3. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  4. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  5. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  6. Retinoids: literature review and suggested algorithm for use prior to facial resurfacing procedures

    Directory of Open Access Journals (Sweden)

    Patrick J Buchanan

    2016-01-01

    Full Text Available Vitamin A-containing products have been used topically since the early 1940s to treat various skin conditions. To date, there are four generations of retinoids, a family of Vitamin A-containing compounds. Tretinoin, all-trans-retinoic acid, is a first-generation, naturally occurring, retinoid. It is available, commercially, as a gel or cream. The authors conducted a complete review of all studies, clinical- and basic science-based studies, within the literature involving tretinoin treatment recommendations for impending facial procedures. The literature currently lacks definitive recommendations for the use of tretinoin-containing products prior to undergoing facial procedures. Tretinoin pretreatment regimens vary greatly in terms of the strength of retinoid used, the length of the pre-procedure treatment, and the ideal time to stop treatment before the procedure. Based on the current literature and personal experience, the authors set forth a set of guidelines for the use of tretinoin prior to various facial procedures.

  7. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  8. Clean fog rapid procedure test of artificially and naturally polluted HVDC porcelain barrel insulators

    International Nuclear Information System (INIS)

    Vlastos, A.E.

    1992-01-01

    The first question asked in this paper refers to the variation of the peak leakage current prior to the flashover and the variation of the time prior to flashover in the test of artificially polluted insulators when using the up-and-down method. To answer this question sums up the test procedure used in the up-and-down method. For each trial represented the insulator was again polluted artificially and then dried following the procedure described in the paper. Then the insulator was transported into the fog chamber and the voltage and fog was switched on simultaneously. In these experiments a low fog injection rate was used

  9. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  10. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  11. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  12. Cardiopulmonary exercise testing prior to myeloablative allo-SCT: a feasibility study.

    Science.gov (United States)

    Kelsey, C R; Scott, J M; Lane, A; Schwitzer, E; West, M J; Thomas, S; Herndon, J E; Michalski, M G; Horwitz, M E; Hennig, T; Jones, L W

    2014-10-01

    The feasibility of symptom-limited cardiopulmonary exercise testing (CPET) prior to allo-SCT was assessed in addition to the prognostic value of CPET-derived measures. CPET was performed prospectively on 21 patients with hematologic malignancies, with assessments of peak (for example, peak oxygen consumption, VO2peak) and submaximal (for example, ventilatory threshold (VT)) measures of cardiopulmonary function. No serious adverse events were observed during CPET procedures, with 95% of patients achieving criteria for a peak test. Mean VO2peak was 24.7±6.4 mL kg(-1 )min(-1) (range: 10.9-35.5), equivalent to 29%±17% below that of age-matched healthy controls. All patients proceeded with the conditioning regimen followed by allo-SCT. Median follow-up was 25 months. During this period, 11 (52.4%) patients died (n=6, relapsed disease; n=5, non-relapse mortality (NRM)); 9 patients (43%) developed pulmonary toxicity. In univariate analyses, both peak and submaximal markers of cardiopulmonary function were predictors of OS, pulmonary toxicity and NRM. For OS, the HR for VO2peak and VT were 0.89 (95% CI, 0.8-0.99, P=0.04) and 0.84 (95% CI, 0.71-0.98, P=0.03), respectively. In conclusion, CPET is safe and feasible prior to allo-SCT. Patients have marked impairments in cardiopulmonary function prior to allo-SCT. CPET-derived metrics may complement conventional measures to improve risk stratification.

  13. Preanalytical errors in primary healthcare: a questionnaire study of information search procedures, test request management and test tube labelling.

    Science.gov (United States)

    Söderberg, Johan; Brulin, Christine; Grankvist, Kjell; Wallin, Olof

    2009-01-01

    Most errors in laboratory medicine occur in the preanalytical phase and are the result of human mistakes. This study investigated information search procedures, test request management and test tube labelling in primary healthcare compared to the same procedures amongst clinical laboratory staff. A questionnaire was completed by 317 venous blood sampling staff in 70 primary healthcare centres and in two clinical laboratories (response rate = 94%). Correct procedures were not always followed. Only 60% of the primary healthcare staff reported that they always sought information in the updated, online laboratory manual. Only 12% reported that they always labelled the test tubes prior to drawing blood samples. No major differences between primary healthcare centres and clinical laboratories were found, except for test tube labelling, whereby the laboratory staff reported better practices. Re-education and access to documented routines were not clearly associated with better practices. The preanalytical procedure in the surveyed primary healthcare centres was associated with a risk of errors which could affect patient safety. To improve patient safety in laboratory testing, all healthcare providers should survey their preanalytical procedures and improve the total testing process with a systems perspective.

  14. Antibiotic Prophylaxis for Gynecologic Procedures prior to and during the Utilization of Assisted Reproductive Technologies: A Systematic Review

    Directory of Open Access Journals (Sweden)

    Nigel Pereira

    2016-01-01

    Full Text Available The use of assisted reproductive technologies (ART has increased steadily. There has been a corresponding increase in the number of ART-related procedures such as hysterosalpingography (HSG, saline infusion sonography (SIS, hysteroscopy, laparoscopy, oocyte retrieval, and embryo transfer (ET. While performing these procedures, the abdomen, upper vagina, and endocervix are breached, leading to the possibility of seeding pelvic structures with microorganisms. Antibiotic prophylaxis is therefore important to prevent or treat any procedure-related infections. After careful review of the published literature, it is evident that routine antibiotic prophylaxis is generally not recommended for the majority of ART-related procedures. For transcervical procedures such as HSG, SIS, hysteroscopy, ET, and chromotubation, patients at risk for pelvic infections should be screened and treated prior to the procedure. Patients with a history of pelvic inflammatory disease (PID or dilated fallopian tubes are at high risk for postprocedural infections and should be given antibiotic prophylaxis during procedures such as HSG, SIS, or chromotubation. Antibiotic prophylaxis is recommended prior to oocyte retrieval in patients with a history of endometriosis, PID, ruptured appendicitis, or multiple prior pelvic surgeries.

  15. The quality of procedures to assess and credit prior learning: Implications for design.

    NARCIS (Netherlands)

    Joosten-ten Brinke, Desirée; Sluijsmans, Dominique; Brand-Gruwel, Saskia; Jochems, Wim

    2008-01-01

    Joosten-ten Brinke, D., Sluijsmans, D. M. A., Brand-Gruwel, S., & Jochems, W. M. G. (2008). The quality of procedures to assess and credit prior learning: Implications for design. Educational Research Review, 3, 51-65. doi:10.1016/j.edurev.2007.08.001.

  16. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  17. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  18. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  19. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  20. Automation of the testing procedure

    International Nuclear Information System (INIS)

    Haas, H.; Fleischer, M.; Bachner, E.

    1979-01-01

    For the judgement of technologies applied and the testing of specific components of the HTR primary circuit, complex test procedures and data evaluations are required. Extensive automation of these test procedures is indispensable. (orig.) [de

  1. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  2. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  3. Toddler test or procedure preparation

    Science.gov (United States)

    ... a test or procedure: Explain the procedure in language your child understands, using plain words. Avoid abstract terms. Make sure your child understands the exact body part involved in the test, and that the ...

  4. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  5. A Retrospective Propensity Score-Matched Early Thromboembolic Event Analysis of Prothrombin Complex Concentrate vs Fresh Frozen Plasma for Warfarin Reversal Prior to Emergency Neurosurgical Procedures.

    Science.gov (United States)

    Agarwal, Prateek; Abdullah, Kalil G; Ramayya, Ashwin G; Nayak, Nikhil R; Lucas, Timothy H

    2017-06-29

    Reversal of therapeutic anticoagulation prior to emergency neurosurgical procedures is required in the setting of intracranial hemorrhage. Multifactor prothrombin complex concentrate (PCC) promises rapid efficacy but may increase the probability of thrombotic complications compared to fresh frozen plasma (FFP). To compare the rate of thrombotic complications in patients treated with PCC or FFP to reverse therapeutic anticoagulation prior to emergency neurosurgical procedures in the setting of intracranial hemorrhage at a level I trauma center. Sixty-three consecutive patients on warfarin therapy presenting with intracranial hemorrhage who received anticoagulation reversal prior to emergency neurosurgical procedures were retrospectively identified between 2007 and 2016. They were divided into 2 cohorts based on reversal agent, either PCC (n = 28) or FFP (n = 35). The thrombotic complications rates within 72 h of reversal were compared using the χ 2 test. A multivariate propensity score matching analysis was used to limit the threat to interval validity from selection bias arising from differences in demographics, laboratory values, history, and clinical status. Thrombotic complications were uncommon in this neurosurgical population, occurring in 1.59% (1/63) of treated patients. There was no significant difference in the thrombotic complication rate between groups, 3.57% (1/28; PCC group) vs 0% (0/35; FFP group). Propensity score matching analysis validated this finding after controlling for any selection bias. In this limited sample, thrombotic complication rates were similar between use of PCC and FFP for anticoagulation reversal in the management of intracranial hemorrhage prior to emergency neurosurgical procedures. Copyright © 2017 by the Congress of Neurological Surgeons

  6. Leach test of six 192-iridium pellets based on the IAEA 'special form' test procedures

    International Nuclear Information System (INIS)

    Gordon, G.; Gerdingh, R.

    1981-07-01

    The designation 'special form' may be applied to indispersible solid radioactive material if the material meets the requirements of the tests described in the International Atomic Energy Agency Regulations for the Safe Transport of Radioactive Type Materials. This report presents the procedures and results of a leach test performed as specified in the regulations on 6 'as received' active 192-iridium pellets. Mechanical tests were not carried out prior to or following the leach test. The activity of each of the first 6 water baths was found to be between 2.3 and 12.6 μCi, (8.5 x 10 4 and 4.7 x 10 5 Bq) and of the second 6, between 1.3 to 6.0 μCi, (4.8 x 10 4 to 2.2 x 10 5 Bq) thus exceeding the allowable limit

  7. 46 CFR 176.710 - Inspection and testing prior to hot work.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Inspection and testing prior to hot work. 176.710... testing prior to hot work. (a) An inspection for flammable or combustible gases must be conducted by a... operations involving riveting, welding, burning, or other fire producing actions may be made aboard a vessel...

  8. 46 CFR 115.710 - Inspection and testing prior to hot work.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Inspection and testing prior to hot work. 115.710... AND CERTIFICATION Repairs and Alterations § 115.710 Inspection and testing prior to hot work. (a) An... involving riveting, welding, burning, or other fire producing actions may be made aboard a vessel: (1...

  9. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  10. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  11. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  12. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  13. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  14. 12 CFR 24.5 - Public welfare investment after-the-fact notice and prior approval procedures.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Public welfare investment after-the-fact notice and prior approval procedures. 24.5 Section 24.5 Banks and Banking COMPTROLLER OF THE CURRENCY... capital and surplus represented by the proposed investment and by the bank's aggregate outstanding public...

  15. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  16. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  17. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy...

  18. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  19. Dispersant testing : a study on analytical test procedures

    International Nuclear Information System (INIS)

    Fingas, M.F.; Fieldhouse, B.; Wang, Z.; Environment Canada, Ottawa, ON

    2004-01-01

    Crude oil is a complex mixture of hydrocarbons, ranging from small, volatile compounds to very large, non-volatile compounds. Analysis of the dispersed oil is crucial. This paper described Environment Canada's ongoing studies on various traits of dispersants. In particular, it describes small studies related to dispersant effectiveness and methods to improve analytical procedures. The study also re-evaluated the analytical procedure for the Swirling Flask Test, which is now part of the ASTM standard procedure. There are new and improved methods for analyzing oil-in-water using gas chromatography (GC). The methods could be further enhanced by integrating the entire chromatogram rather than just peaks. This would result in a decrease in maximum variation from 5 per cent to about 2 per cent. For oil-dispersant studies, the surfactant-dispersed oil hydrocarbons consist of two parts: GC-resolved hydrocarbons and GC-unresolved hydrocarbons. This study also tested a second feature of the Swirling Flask Test in which the side spout was tested and compared with a new vessel with a septum port instead of a side spout. This decreased the variability as well as the energy and mixing in the vessel. Rather than being a variation of the Swirling Flask Test, it was suggested that a spoutless vessel might be considered as a completely separate test. 7 refs., 2 tabs., 4 figs

  20. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  1. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  2. Analysis and optimization of blood-testing procedures.

    NARCIS (Netherlands)

    Bar-Lev, S.K.; Boxma, O.J.; Perry, D.; Vastazos, L.P.

    2017-01-01

    This paper is devoted to the performance analysis and optimization of blood testing procedures. We present a queueing model of two queues in series, representing the two stages of a blood-testing procedure. Service (testing) in stage 1 is performed in batches, whereas it is done individually in

  3. DOT-7A packaging test procedure

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1995-01-01

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes

  4. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  5. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  6. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  7. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  8. Thromboelastometry versus standard coagulation tests versus restrictive protocol to guide blood transfusion prior to central venous catheterization in cirrhosis: study protocol for a randomized controlled trial.

    Science.gov (United States)

    Rocha, Leonardo Lima; Pessoa, Camila Menezes Souza; Neto, Ary Serpa; do Prado, Rogerio Ruscitto; Silva, Eliezer; de Almeida, Marcio Dias; Correa, Thiago Domingos

    2017-02-27

    Liver failure patients have traditionally been empirically transfused prior to invasive procedures. Blood transfusion is associated with immunologic and nonimmunologic reactions, increased risk of adverse outcomes and high costs. Scientific evidence supporting empirical transfusion is lacking, and the best approach for blood transfusion prior to invasive procedures in cirrhotic patients has not been established so far. The aim of this study is to compare three transfusion strategies (routine coagulation test-guided - ordinary or restrictive, or thromboelastometry-guided) prior to central venous catheterization in critically ill patients with cirrhosis. Design and setting: a double-blinded, parallel-group, single-center, randomized controlled clinical trial in a tertiary private hospital in São Paulo, Brazil. adults (aged 18 years or older) admitted to the intensive care unit with cirrhosis and an indication for central venous line insertion. Patients will be randomly assigned to three groups for blood transfusion strategy prior to central venous catheterization: standard coagulation tests-based, thromboelastometry-based, or restrictive. The primary efficacy endpoint will be the proportion of patients transfused with any blood product prior to central venous catheterization. The primary safety endpoint will be the incidence of major bleeding. Secondary endpoints will be the proportion of transfusion of fresh frozen plasma, platelets and cryoprecipitate; infused volume of blood products; hemoglobin and hematocrit before and after the procedure; intensive care unit and hospital length of stay; 28-day and hospital mortality; incidence of minor bleeding; transfusion-related adverse reactions; and cost analysis. This study will evaluate three strategies to guide blood transfusion prior to central venous line placement in severely ill patients with cirrhosis. We hypothesized that thromboelastometry-based and/or restrictive protocols are safe and would significantly

  9. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    that need to be attained for successful characterization of the planned demonstrators and it deals with the material characterization and prototype testing for the COTECH demonstrators. The summary of this report includes:  General description of COTECH industrial demonstrators  COTECH materials...... and material characterization techniques  Characterization techniques of the COTECH demonstrators  Functionality and lifecycle testing of the COTECH demonstrators Besides the general introduction and conclusion each section of the report is dedicated to the characterization techniques and test procedure.......Characterization techniques and test procedure requirements for innovative self-ligating dental brackets (EO) Section 5.Characterization techniques and test procedure requirements for smart diagnostic chips comprising a microfluidic channel system (GBO) Section 6.Characterization techniques and test procedure...

  10. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  11. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  12. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  13. Current use of pharmacogenetic testing: a national survey of thiopurine methyltransferase testing prior to azathioprine prescription.

    Science.gov (United States)

    Fargher, E A; Tricker, K; Newman, W; Elliott, R; Roberts, S A; Shaffer, J L; Bruce, I; Payne, K

    2007-04-01

    Azathioprine is an immunosuppressant prescribed for the treatment of inflammatory conditions and after organ transplantation. Risk of neutropaenia has limited the effective use of azathioprine (AZA) and driven requirements for careful monitoring and blood tests. Thiopurine methyltransferase (TPMT) is a genetically moderated key enzyme involved in the metabolism of AZA that can be used to stratify individuals into different levels of risk of developing neutropaenia. Two techniques can be used to measure TPMT status: enzyme-level testing (phenotype testing) and DNA based testing (genotype testing). To identify the current uptake of TPMT enzyme-level testing, TPMT genotype testing, and, the role of guidelines; to inform the prescribing and monitoring of AZA. A survey was mailed to a consultant dermatologist, gastroenterologist, and rheumatologist at every NHS Hospital Trust in England. The survey comprised mainly closed questions exploring: use of AZA and monitoring; use of TPMT enzyme-level testing and genotype testing; and, the role of guidelines to guide prescribing practice. A 70% (n=287) response rate was obtained. The majority of respondents reported prescribing AZA (99%, n=283). Prescribing and monitoring patterns differed between individual respondents and between the three disciplines. TPMT enzyme-level testing was reportedly used by 67% (n=189) of respondents, but this differed by discipline (dermatologists 94%, gastroenterologists 60%, rheumatologists 47%). In 91% of cases enzyme-level testing was carried out prior to prescribing AZA. Genotype testing is not typically available to NHS clinicians but 15 clinicians (six dermatologists, six gastroenterologists, three rheumatologists) reported using it. Most consultants (82%) reported using guidelines to inform their AZA prescribing and monitoring (dermatologists 81%, gastroenterologists 75%, rheumatologists 94%). Two-thirds of the consultants surveyed in England are using TPMT enzyme-level testing, prior to

  14. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  15. 40 CFR 53.23 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... deviation about the mean and is expressed in concentration units. (2) Test procedure. (i) Allow sufficient... definition. Positive or negative response caused by a substance other than the one being measured. (2) Test...) Before testing for each interferent, allow the test analyzer to sample through the scrubber a test...

  16. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  17. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  18. 21 CFR 610.1 - Tests prior to release required for each lot.

    Science.gov (United States)

    2010-04-01

    ....1 Section 610.1 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... release required for each lot. No lot of any licensed product shall be released by the manufacturer prior... considered in determining whether or not the test results meet the test objective, except that a test result...

  19. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  20. Procedure to select test organisms for environmental risk assessment of genetically modified crops in aquatic systems.

    Science.gov (United States)

    Hilbeck, Angelika; Bundschuh, Rebecca; Bundschuh, Mirco; Hofmann, Frieder; Oehen, Bernadette; Otto, Mathias; Schulz, Ralf; Trtikova, Miluse

    2017-11-01

    For a long time, the environmental risk assessment (ERA) of genetically modified (GM) crops focused mainly on terrestrial ecosystems. This changed when it was scientifically established that aquatic ecosystems are exposed to GM crop residues that may negatively affect aquatic species. To assist the risk assessment process, we present a tool to identify ecologically relevant species usable in tiered testing prior to authorization or for biological monitoring in the field. The tool is derived from a selection procedure for terrestrial ecosystems with substantial but necessary changes to adequately consider the differences in the type of ecosystems. By using available information from the Water Framework Directive (2000/60/EC), the procedure can draw upon existing biological data on aquatic systems. The proposed procedure for aquatic ecosystems was tested for the first time during an expert workshop in 2013, using the cultivation of Bacillus thuringiensis (Bt) maize as the GM crop and 1 stream type as the receiving environment in the model system. During this workshop, species executing important ecological functions in aquatic environments were identified in a stepwise procedure according to predefined ecological criteria. By doing so, we demonstrated that the procedure is practicable with regard to its goal: From the initial long list of 141 potentially exposed aquatic species, 7 species and 1 genus were identified as the most suitable candidates for nontarget testing programs. Integr Environ Assess Manag 2017;13:974-979. © 2017 SETAC. © 2017 SETAC.

  1. Cloud-based Electronic Test Procedures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Test procedures are at the heart of any experimental process, especially those involving novel and complex hardware. Whether these procedures are for system...

  2. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  3. Portal monitor evaluation and test procedure

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Rich, B.L.

    1983-10-01

    The purpose was to develop techniques and procedures to allow users to measure performance and sensitivity of portal monitors. Additionally, a methodology was developed to assist users in optimizing monitor performance. The two monitors tested utilized thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: a) background count rate and the statistical variability, b) detector efficiency at different distances, c) moving source sensitivity for various size sources and speeds, and d) false alarm rates at different background levels. A model was developed for the moving source measurements to compare the experimental data with measured results, and to test whether it is possible to adequately model the behavior of a portal monitor's response to a moving source. The model results were compared with the actual test results. A procedure for testing portal monitors is also given. 1 reference, 9 figures, 8 tables

  4. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  5. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  6. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  7. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  8. Adolescent test or procedure preparation

    Science.gov (United States)

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older teens may benefit from videos that show adolescents of the same age explaining ...

  9. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  10. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  11. Consensus guidelines for the use of bowel preparation prior to colonic diagnostic procedures: colonoscopy and small bowel video capsule endoscopy

    NARCIS (Netherlands)

    Mathus-Vliegen, Elisabeth; Pellisé, Maria; Heresbach, Denis; Fischbach, Wolfgang; Dixon, Tricia; Belsey, Jonathan; Parente, Fabrizio; Rio-Tinto, Ricardo; Brown, Alistair; Toth, Ervin; Crosta, Cristiano; Layer, Peter; Epstein, Owen; Boustiere, Christian

    2013-01-01

    Adequate bowel preparation prior to colonic diagnostic procedures is essential to ensure adequate visualisation. This consensus aims to provide guidance as to the appropriate use of bowel preparation for a range of defined clinical circumstances. A consensus group from across Europe was convened and

  12. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  13. 16 CFR 1510.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedure. 1510.4 Section 1510.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS... plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  14. Testing of tubular goods - a critical review of past and actual testing procedures

    Energy Technology Data Exchange (ETDEWEB)

    Teodoriu, C. [Texas A and M Univ., Houston, TX (United States); Holzmann, J.; Klaws, M. [TU Clausthal (Germany). Inst. fuer Erdoel- und Erdgastechnik

    2007-09-13

    Testing of oil country tubular goods (OCTG) is based on standards and offers the user a comparison platform between products of different manufacturers. But, do the standard based testing procedures assume the real loads on OCTG? More likely, the existing standards or recommendations on tubular testing have been evolving together with the new demands on OCTG loading. Since nowadays the oil and gas industry is looking to develop extreme reservoir types (deep water, HP/HT), there is a need of a better understanding and continuous improvement of testing procedures. The following poster proposes an analysis of existing procedures to test tubular goods and then will focus on the future demands on OCTG testing. New loads, as casing fatigue, will be discussed and analyzed based on the authors experience gained during more than 8 years of testing tubular goods at the Clausthal University of Technology, Institute of Petroleum Engineering. (orig.)

  15. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  16. 34 CFR 303.403 - Prior notice; native language.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Prior notice; native language. 303.403 Section 303.403... TODDLERS WITH DISABILITIES Procedural Safeguards General § 303.403 Prior notice; native language. (a... file a complaint and the timelines under those procedures. (c) Native language. (1) The notice must be...

  17. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  18. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  19. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  20. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  1. 40 CFR 51.357 - Test procedures and standards.

    Science.gov (United States)

    2010-07-01

    ... following steps: (i) Test equipment shall be connected to the fuel tank canister hose at the canister end... minutes and monitor for a sudden pressure drop, indicating that the fuel tank was pressurized. (v) The... be performed without repair or adjustment at the inspection facility, prior to the test, except as...

  2. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  3. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  4. Test procedure forms for sludge retrieval and packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides test procedure forms for sludge retrieval and packaging tests in the 305 Cold Test Facility. The completed and approved forms provide all descriptions, criteria and analysis to safely perform sludge equipment tests in the 305 Cold Test Facility

  5. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  6. Specifications for Testing Procedures at Svåheia

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Kofoed, Jens Peter

    This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance.......This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance....

  7. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  8. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... procedures for electric motors to allow currently unregulated motors to be tested by clarifying the test...

  9. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  10. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  11. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  12. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  13. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  14. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  15. Influence of Test Procedures on the Thermomechanical Properties of a 55NiTi Shape Memory Alloy

    Science.gov (United States)

    Padula, Santo A., II; Gaydosh, Darrell J.; Noebe, Ronald D.; Bigelow, Glen S.; Garg, Anita; Lagoudas, Dimitris; Karaman, Ibrahim; Atli, Kadri C.

    2008-01-01

    Over the past few decades, binary NiTi shape memory alloys have received attention due to their unique mechanical characteristics, leading to their potential use in low-temperature, solid-state actuator applications. However, prior to using these materials for such applications, the physical response of these systems to mechanical and thermal stimuli must be thoroughly understood and modeled to aid designers in developing SMA-enabled systems. Even though shape memory alloys have been around for almost five decades, very little effort has been made to standardize testing procedures. Although some standards for measuring the transformation temperatures of SMA s are available, no real standards exist for determining the various mechanical and thermomechanical properties that govern the usefulness of these unique materials. Consequently, this study involved testing a 55NiTi alloy using a variety of different test methodologies. All samples tested were taken from the same heat and batch to remove the influence of sample pedigree on the observed results. When the material was tested under constant-stress, thermal-cycle conditions, variations in the characteristic material responses were observed, depending on test methodology. The transformation strain and irreversible strain were impacted more than the transformation temperatures, which only showed an affect with regard to applied external stress. In some cases, test methodology altered the transformation strain by 0.005-0.01mm/mm, which translates into a difference in work output capability of approximately 2 J/cu cm (290 in!lbf/cu in). These results indicate the need for the development of testing standards so that meaningful data can be generated and successfully incorporated into viable models and hardware. The use of consistent testing procedures is also important when comparing results from one research organization to another. To this end, differences in the observed responses will be presented, contrasted and

  16. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  17. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  18. Validity in assessment of prior learning

    DEFF Research Database (Denmark)

    Wahlgren, Bjarne; Aarkrog, Vibe

    2015-01-01

    , the article discusses the need for specific criteria for assessment. The reliability and validity of the assessment procedures depend on whether the competences are well-defined, and whether the teachers are adequately trained for the assessment procedures. Keywords: assessment, prior learning, adult...... education, vocational training, lifelong learning, validity...

  19. A FLOW-THROUGH TESTING PROCEDURE WITH DUCKWEED (LEMNA MINOR L.)

    Science.gov (United States)

    Lemna minor is one of the smallest flowering plants. Because of its floating habit, ease of culture, and small size it is well adapted for laboratory investigations. Procedures for flow-through tests were developed. Testing procedures were developed with this apparatus. By using ...

  20. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  1. Quality assurance of radiopharmaceuticals-specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Pojer, P.M.

    1981-08-01

    This report is a compilation of test methods used and specifications adopted for the Radiopharmaceutical Quality Assurance Test Programme conducted by the Australian Radiation Laboratory. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods have been developed at the ARL

  2. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  3. Vehicle accelerated corrosion test procedures for automotive in Malaysia

    Directory of Open Access Journals (Sweden)

    Anuar Liza

    2017-01-01

    Full Text Available An accelerated corrosion test, known as proving ground accelerated test, is commonly performed by automotive manufacturers to evaluate the corrosion performance of a vehicle. The test combines corrosion and durability inputs to detect potential failures that may occur during in-service conditions. Currently, the test is conducted at an external test center overseas. Such test is aimed to simulate the effects of one year accelerated corrosion in severe corrosive environment of the north-east and south east of America. However, the test results obtained do not correlate with the actual corrosion conditions observed in the Malaysian market, which is likely attributed to the different test environment of the tropical climate of vehicles in service. Therefore, a vehicle accelerated corrosion test procedure that suits the Malaysian market is proposed and benchmarked with other global car manufacturers that have their own dedicated corrosion test procedure. In the present work, a test track is used as the corrosion test ground and consists of various types of roads for structural durability exposures. Corrosion related facilities like salt trough, mud trough and gravel road are constructed as addition to the existing facilities. The establishment of accelerated corrosion test facilities has contributed to the development of initial accelerated corrosion test procedure for the national car manufacturer. The corrosion exposure is monitored by fitting test coupons at the underbody of test vehicle using mass loss technique so that the desired corrosion rate capable of simulating the real time corrosion effects for its target market.

  4. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures and...

  5. CANFLEX fuel bundle cross-flow endurance test 2 (test procedure)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Deok; Chung, C. H.; Chang, S. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    This report describes test procedure of cross-flow 2 test for CANFLEX fuel. In October 1996. a cross-flow test was successfully performed in the KAERI Hot Test Loop for four hours at a water flow rate of 31kg/s, temperature of 266 deg C and inlet pressure of 11MPa, but it is requested more extended time periods to determine a realistic operational margin for the CANFLEX bundle during abnormal refuelling operations. The test shall be conducted for twenty two hours under the reactor conditions. After an initial period of ten hours, the test shall be stopped at the intervals of four hours for bundle inspection and inspect the test bundle end-plate to end-cap welds for failure or crack propagation using liquid penetrant examination. 2 refs., 1 fig. (Author)

  6. High Satisfaction and Low Distress in Breast Cancer Patients One Year after BRCA-Mutation Testing without Prior Face-to-Face Genetic Counseling.

    Science.gov (United States)

    Sie, Aisha S; Spruijt, Liesbeth; van Zelst-Stams, Wendy A G; Mensenkamp, Arjen R; Ligtenberg, Marjolijn J L; Brunner, Han G; Prins, Judith B; Hoogerbrugge, Nicoline

    2016-06-01

    According to standard practice following referral to clinical genetics, most high risk breast cancer (BC) patients in many countries receive face-to-face genetic counseling prior to BRCA-mutation testing (DNA-intake). We evaluated a novel format by prospective study: replacing the intake consultation with telephone, written and digital information sent home. Face-to-face counseling then followed BRCA-mutation testing (DNA-direct). One year after BRCA-result disclosure, 108 participants returned long-term follow-up questionnaires, of whom 59 (55 %) had previously chosen DNA-direct (intervention) versus DNA-intake (standard practice i.e., control: 45 %). Questionnaires assessed satisfaction and psychological distress. All participants were satisfied and 85 % of DNA-direct participants would choose this procedure again; 10 % would prefer DNA-intake and 5 % were undecided. In repeated measurements ANOVA, general distress (GHQ-12, p = 0.01) and BC-specific distress (IES-bc, p = 0.03) were lower in DNA-direct than DNA-intake at all time measurements. Heredity-specific distress (IES-her) did not differ significantly between groups. Multivariate regression analyses showed that choice of procedure did not significantly contribute to either general or heredity-specific distress. BC-specific distress (after BC diagnosis) did contribute to both general and heredity-specific distress. This suggests that higher distress scores reflected BC experience, rather than the type of genetic diagnostic procedure. In conclusion, the large majority of BC patients that used DNA-direct reported high satisfaction without increased distress both in the short term, and 1 year after conclusion of genetic testing.

  7. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... device, the exhaust pipe must be the same diameter as found in-use for at least 4 pipe diameters upstream... Exhaust Test Procedures § 86.1327-96 Engine dynamometer test procedures; overview. (a) The engine.... The exhaust emissions are diluted with ambient air and a continuous proportional sample is collected...

  8. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and... (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... mode energy use of products that combine a microwave oven with other appliance functionality, as well...

  9. Development of an accelerated creep testing procedure for geosynthetics.

    Science.gov (United States)

    1997-09-01

    The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...

  10. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  11. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  12. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  13. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  14. A Bayesian hierarchical model with novel prior specifications for estimating HIV testing rates.

    Science.gov (United States)

    An, Qian; Kang, Jian; Song, Ruiguang; Hall, H Irene

    2016-04-30

    Human immunodeficiency virus (HIV) infection is a severe infectious disease actively spreading globally, and acquired immunodeficiency syndrome (AIDS) is an advanced stage of HIV infection. The HIV testing rate, that is, the probability that an AIDS-free HIV infected person seeks a test for HIV during a particular time interval, given no previous positive test has been obtained prior to the start of the time, is an important parameter for public health. In this paper, we propose a Bayesian hierarchical model with two levels of hierarchy to estimate the HIV testing rate using annual AIDS and AIDS-free HIV diagnoses data. At level one, we model the latent number of HIV infections for each year using a Poisson distribution with the intensity parameter representing the HIV incidence rate. At level two, the annual numbers of AIDS and AIDS-free HIV diagnosed cases and all undiagnosed cases stratified by the HIV infections at different years are modeled using a multinomial distribution with parameters including the HIV testing rate. We propose a new class of priors for the HIV incidence rate and HIV testing rate taking into account the temporal dependence of these parameters to improve the estimation accuracy. We develop an efficient posterior computation algorithm based on the adaptive rejection metropolis sampling technique. We demonstrate our model using simulation studies and the analysis of the national HIV surveillance data in the USA. Copyright © 2015 John Wiley & Sons, Ltd.

  15. 702AZ aging waste ventilation facility year 2000 test procedure

    International Nuclear Information System (INIS)

    Winkelman, W.D.

    1998-01-01

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure

  16. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    International Nuclear Information System (INIS)

    Biyani, R.K.; Hendrickson, D.W.

    1997-01-01

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations

  17. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  18. Procedures for Selecting Items for Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1989-01-01

    Several classical approaches and alternative approaches to item selection for computerized adaptive testing (CAT) are reviewed and compared. The study also describes procedures for constrained CAT that may be added to classical item selection approaches to allow them to be used for applied testing. (TJH)

  19. New energy test procedures for refrigerators and other appliances; FINAL

    International Nuclear Information System (INIS)

    Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

    1999-01-01

    Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances

  20. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  1. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  2. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... provided less forecast accuracy improvement and it needed a longer time to achieve relatively acceptable forecast uncertainty....

  3. 40 CFR 53.43 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... sampling zone (see § 53.42(d)). To meet the maximum blockage limit of § 53.42(a) or for convenience, part... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind tunnel. Collect...

  4. 40 CFR 600.111-08 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... § 600.109(b) while sampling the exhaust gas. (viii) Sampling must begin two seconds before beginning the... convenience of the user, the revised text is set forth as follows: § 600.111-08 Test procedures. (f) Special...

  5. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  6. CEL Working procedures for WRAP 2A formulation development test

    International Nuclear Information System (INIS)

    Duchsherer, M.J.

    1994-01-01

    The WRAP 2A facility will encapsulate retrieved, stored, and newly generated contact-handled mixed low level waste (MLLW) into 55-500 gal cementitous forms. Standardized test procedures will be required to facilitate this process. Cementitous specimens will be prepared from simulated drum wastes and will be tested in the Chemical Engineering Laboratory using the laboratory operating/working procedures encorporated into this document

  7. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  8. Testing animal-assisted cleaning prior to transplantation in coral reef restoration.

    Science.gov (United States)

    Frias-Torres, Sarah; van de Geer, Casper

    2015-01-01

    Rearing coral fragments in nurseries and subsequent transplantation onto a degraded reef is a common approach for coral reef restoration. However, if barnacles and other biofouling organisms are not removed prior to transplantation, fish will dislodge newly cemented corals when feeding on biofouling organisms. This behavior can lead to an increase in diver time due to the need to reattach the corals. Thus, cleaning nurseries to remove biofouling organisms such as algae and invertebrates is necessary prior to transplantation, and this cleaning constitutes a significant time investment in a restoration project. We tested a novel biomimicry technique of animal-assisted cleaning on nursery corals prior to transplantation at a coral reef restoration site in Seychelles, Indian Ocean. To determine whether animal-assisted cleaning was possible, preliminary visual underwater surveys were performed to quantify the fish community at the study site. Then, cleaning stations consisting of nursery ropes carrying corals and biofouling organisms, set at 0.3 m, 2 m, 4 m, 6 m and 8 m from the seabed, were placed at both the transplantation (treatment) site and the nursery (control) site. Remote GoPro video cameras recorded fish feeding at the nursery ropes without human disturbance. A reef fish assemblage of 32 species from 4 trophic levels (18.8% herbivores, 18.8% omnivores, 59.3% secondary consumers and 3.1% carnivores) consumed 95% of the barnacles on the coral nursery ropes placed 0.3 m above the seabed. Using this cleaning station, we reduced coral dislodgement from 16% to zero. This cleaning station technique could be included as a step prior to coral transplantation worldwide on the basis of location-specific fish assemblages and during the early nursery phase of sexually produced juvenile corals.

  9. Testing animal-assisted cleaning prior to transplantation in coral reef restoration

    Directory of Open Access Journals (Sweden)

    Sarah Frias-Torres

    2015-09-01

    Full Text Available Rearing coral fragments in nurseries and subsequent transplantation onto a degraded reef is a common approach for coral reef restoration. However, if barnacles and other biofouling organisms are not removed prior to transplantation, fish will dislodge newly cemented corals when feeding on biofouling organisms. This behavior can lead to an increase in diver time due to the need to reattach the corals. Thus, cleaning nurseries to remove biofouling organisms such as algae and invertebrates is necessary prior to transplantation, and this cleaning constitutes a significant time investment in a restoration project. We tested a novel biomimicry technique of animal-assisted cleaning on nursery corals prior to transplantation at a coral reef restoration site in Seychelles, Indian Ocean. To determine whether animal-assisted cleaning was possible, preliminary visual underwater surveys were performed to quantify the fish community at the study site. Then, cleaning stations consisting of nursery ropes carrying corals and biofouling organisms, set at 0.3 m, 2 m, 4 m, 6 m and 8 m from the seabed, were placed at both the transplantation (treatment site and the nursery (control site. Remote GoPro video cameras recorded fish feeding at the nursery ropes without human disturbance. A reef fish assemblage of 32 species from 4 trophic levels (18.8% herbivores, 18.8% omnivores, 59.3% secondary consumers and 3.1% carnivores consumed 95% of the barnacles on the coral nursery ropes placed 0.3 m above the seabed. Using this cleaning station, we reduced coral dislodgement from 16% to zero. This cleaning station technique could be included as a step prior to coral transplantation worldwide on the basis of location-specific fish assemblages and during the early nursery phase of sexually produced juvenile corals.

  10. Testing animal-assisted cleaning prior to transplantation in coral reef restoration

    Science.gov (United States)

    van de Geer, Casper

    2015-01-01

    Rearing coral fragments in nurseries and subsequent transplantation onto a degraded reef is a common approach for coral reef restoration. However, if barnacles and other biofouling organisms are not removed prior to transplantation, fish will dislodge newly cemented corals when feeding on biofouling organisms. This behavior can lead to an increase in diver time due to the need to reattach the corals. Thus, cleaning nurseries to remove biofouling organisms such as algae and invertebrates is necessary prior to transplantation, and this cleaning constitutes a significant time investment in a restoration project. We tested a novel biomimicry technique of animal-assisted cleaning on nursery corals prior to transplantation at a coral reef restoration site in Seychelles, Indian Ocean. To determine whether animal-assisted cleaning was possible, preliminary visual underwater surveys were performed to quantify the fish community at the study site. Then, cleaning stations consisting of nursery ropes carrying corals and biofouling organisms, set at 0.3 m, 2 m, 4 m, 6 m and 8 m from the seabed, were placed at both the transplantation (treatment) site and the nursery (control) site. Remote GoPro video cameras recorded fish feeding at the nursery ropes without human disturbance. A reef fish assemblage of 32 species from 4 trophic levels (18.8% herbivores, 18.8% omnivores, 59.3% secondary consumers and 3.1% carnivores) consumed 95% of the barnacles on the coral nursery ropes placed 0.3 m above the seabed. Using this cleaning station, we reduced coral dislodgement from 16% to zero. This cleaning station technique could be included as a step prior to coral transplantation worldwide on the basis of location-specific fish assemblages and during the early nursery phase of sexually produced juvenile corals. PMID:26468440

  11. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax... displacement (compression) relative to the spine, measured with the chest deflection transducer (SA-572-S50...

  12. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... September 14, 1977. 42 FR 46140. Industry representatives viewed these test procedures as too complex and... Freezers'' (HRF-1- 1979). Using this industry-created test procedure, DOE revised its test procedures on... compartment of such a product to be at a level that would effectively exclude the coverage of combination wine...

  13. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the... energy use of products that combine a microwave oven with other appliance functionality, as well as minor...

  14. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  15. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  16. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  17. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a... specified in 49 CFR 572.124(c): (1) The maximum sternum displacement relative to the spine, measured with...

  18. The influence of different measurement structures on NRTA test procedures

    International Nuclear Information System (INIS)

    Beedgen, R.

    1986-01-01

    The development of sequential statistical test procedures in the area of near real time material accountancy (NRTA) mostly assumed a fixed measurement model of a given model facility. In this paper different measurement models (dispersion matrices) for a sequence of balance periods are studied. They are used to compare the detection probabilities of three different sequential test procedures for losses of material. It is shown how different plant models have an influence on the sensitivity of specified tests. Great importance for that analysis have the optimal loss patterns in each measurement situation

  19. Prevalence of prior HIV testing and associated factors among MSM in Zhejiang Province, China: a cross-sectional study

    Directory of Open Access Journals (Sweden)

    Runhua Li

    2016-11-01

    Full Text Available Abstract Background Men who have sex with men (MSM have become one of high-risk population for human immunodeficiency virus (HIV infection, due to their multiple sex partners and unprotected anal intercourse. Promoting HIV testing is an effective strategy for the prevention and control of HIV infection. We assessed the factors associated with a prior HIV testing history, which could provide guidance for implementation of future HIV intervention programs. Methods A cross-sectional study was conducted in three cities of Zhejiang Province, namely, Hangzhou, Ningbo and Wenzhou, using respondent-driven sampling, between December 2013 and June 2014. A face-to-face questionnaire survey was employed to collect relevant information about HIV testing. Univariate and multivariate logistic regression analyses were used to identify the factors associated with a prior HIV testing history. Results The adjusted rate of prior HIV testing among MSM in Zhejiang Province was 55.9 %. The adjusted rates of HIV and syphilis infections among MSM in Zhejiang Province were 14.0 % and 11.4 %, respectively. A weighted multivariate analysis showed that MSM of older age were more likely to be tested, as were MSM with higher level of education, self-reported homosexuality and a higher frequency of receiving AIDS/sexually transmitted infections educational intervention in the past year. MSM with suicidal inclination and self-perceived lower possibility of HIV infection were less likely to report ever having undergone an HIV test. Conclusions The prevalence of prior HIV testing among MSM in Zhejiang Province, China is low. Effective and more frequent interventional measures should be adopted to improve risk awareness and psychosocial support for younger, less educated MSM, and to encourage more MSM to undergo HIV testing.

  20. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  1. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  2. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  3. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  4. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging

  5. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  6. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  7. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...... for a monopile testing was provided by Thomassen (2015a), procedure for monopile testing can be found in Thomassen (2015b), while safety instructions were given by Vaitkunaite et al. (2014)....

  8. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  9. Adaptive nonparametric Bayesian inference using location-scale mixture priors

    NARCIS (Netherlands)

    Jonge, de R.; Zanten, van J.H.

    2010-01-01

    We study location-scale mixture priors for nonparametric statistical problems, including multivariate regression, density estimation and classification. We show that a rate-adaptive procedure can be obtained if the prior is properly constructed. In particular, we show that adaptation is achieved if

  10. The Effect of Prior Caffeine Consumption on Neuropsychological Test Performance: A Placebo-Controlled Study.

    Science.gov (United States)

    Walters, Elizabeth R; Lesk, Valerie E

    2016-01-01

    The aim of this study was to investigate whether the prior consumption of 200 mg of pure caffeine affected neuropsychological test scores in a group of elderly participants aged over 60 years. Using a double-blind placebo versus caffeine design, participants were randomly assigned to receive 200 mg of caffeine or placebo. A neuropsychological assessment testing the domains of general cognitive function, processing speed, semantic memory, episodic memory, executive function, working memory and short-term memory was carried out. Significant interaction effects between age, caffeine and scores of executive function and processing speed were found; participants who had received caffeine showed a decline in performance with increasing age. This effect was not seen for participants who received placebo. The results highlight the need to consider and control prior caffeine consumption when scoring neuropsychological assessments in the elderly, which is important for accuracy of diagnosis and corresponding normative data. © 2016 S. Karger AG, Basel.

  11. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion. 1209.7 Section 1209.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY... for smoldering combustion. This section provides the test method for determining smoldering combustion...

  12. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  13. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  14. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  15. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF ENERGY [Docket Number EERE-2011-BT-TP-0041] RIN 1904-AC50 Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires) AGENCY: Office of Energy Efficiency and Renewable... (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires...

  16. Test procedures, AN/AIC-27 system and component units. [for space shuttle

    Science.gov (United States)

    Reiff, F. H.

    1975-01-01

    The AN/AIC-27 (v) intercommunication system is a 30-channel audio distribution which consists of: air crew station units, maintenance station units, and a central control unit. A test procedure for each of the above units and also a test procedure for the system are presented. The intent of the test is to provide data for use in shuttle audio subsystem design.

  17. 75 FR 38422 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-07-02

    ... 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of..., 2011. DATES: This rule is effective July 2, 2010. FOR FURTHER INFORMATION CONTACT: For program issues... Federal Regulations, as follows: PART 40--PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING...

  18. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  19. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  20. 10 CFR 431.193 - Test procedures for measuring energy consumption of distribution transformers.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for measuring energy consumption of distribution transformers. 431.193 Section 431.193 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY... § 431.193 Test procedures for measuring energy consumption of distribution transformers. The test...

  1. Laparoscopic Stephen-Fowler stage procedure: appropriate management for high intra-abdominal testes.

    Science.gov (United States)

    Agrawal, Amit; Joshi, Milind; Mishra, Pankaj; Gupta, Rahul; Sanghvi, Beejal; Parelkar, Sandesh

    2010-03-01

    The length of testicular vessels is the main length-limiting factor to bring down the testes in the scrotum. Fowler and Stephen proposed the division of testicular vessels, high and as far from the testes as possible to maintain collateral blood supply, to treat high intra-abdominal testes. Cortesi introduced the diagnostic laparoscopy and Jorden first did the laparoscopic orchiopexy for nonpalpable testes. We had done Fowler-Stephen staged orchiopexy for high intra-abdominal testes, in which both stages were done laparoscopically. In total, 17 testes of 13 patients had undergone laparoscopic staged Fowler-Stephen orchiopexy. The decision to perform a staged Fowler-Stephen orchiopexy was based on the distance of the testis from the deep inguinal ring on laparoscopy. If distance was more than 2.5 cm, then we proceeded to a laparoscopic staged Fowler-Stephen orchiopexy. In the first stage, testicular vessels were cauterized by bipolar diathermy. Laparoscopic second-stage Fowler-Stephen procedure was done 6 months after the first stage. Patients were regularly followed, and the success of the procedure was assessed by the size of the testes and the position in the scrotum. Testicular vascularity was assessed by color Doppler ultrasonography. There was no testicular atrophy on second stage and on follow-up. All testes were in the scrotum with good size on follow-up. There was no complication related to laparoscopy. In cases of high intra-abdominal testes, the staged Fowler-Stephen procedure should be the procedure of choice. This procedure yields a high success rate. Transaction of vessels by bipolar diathermy is a very safe, cost-effective method.

  2. The Use of Thrombopoietin Receptor Agonists for Correction of Thrombocytopenia prior to Elective Procedures in Chronic Liver Diseases: Review of Current Evidence

    Directory of Open Access Journals (Sweden)

    Kamran Qureshi

    2016-01-01

    Full Text Available Patients with chronic liver diseases (CLD undergo a range of invasive procedures during their clinical lifetime. Various hemostatic abnormalities are frequently identified during the periprocedural work-up; including thrombocytopenia. Thrombocytopenia of cirrhosis is multifactorial in origin, and decreased activity of thrombopoietin has been identified to be a major cause. Liver is an important site of thrombopoietin production and its levels are decreased in patients with cirrhosis. Severe thrombocytopenia (platelet counts < 60–75,000/µL is associated with increased risk of bleeding with invasive procedures. In recent years, compounds with thrombopoietin receptor agonist activity have been studied as therapeutic options to raise platelet counts in CLD. We reviewed the use of Eltrombopag, Romiplostim, and Avatrombopag prior to various invasive procedures in patients with CLD. These agents seem promising in raising platelet counts before elective procedures resulting in reduction in platelet transfusions, and they also enabled more patients to undergo the procedures. However, these studies were not primarily aimed at comparing bleeding episodes among groups. Use of these agents had some adverse consequences, importantly being the occurrence of portal vein thrombosis. This review highlights the need of further studies to identify reliable methods of safely reducing the provoked bleeding risk linked to thrombocytopenia in CLD.

  3. 118-B-1 excavation treatability test procedures

    International Nuclear Information System (INIS)

    Frain, J.M.

    1994-01-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel

  4. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  5. 100 Area soil washing bench-scale test procedures

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing

  6. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  7. 9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.

    Science.gov (United States)

    2010-01-01

    ... samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... for diagnostic testing. (b) The authorized laboratory must identify each egg as to the breeding flock...

  8. 77 FR 49063 - Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products

    Science.gov (United States)

    2012-08-15

    ... Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products; Proposed...-AC01 Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products... procedures for both dishwashers and conventional cooking products for the measurement of energy use in fan...

  9. Developing a Cloze Procedure as a Reading Comprehension Achievement Test

    Directory of Open Access Journals (Sweden)

    I Ketut Seken

    2004-01-01

    Full Text Available The project was concerned with developing a cloze procedure as a reading comprehension achievement test. The subjects were students of the English Department of the Faculty of Letters, State University of Malang, who were halfway in the semester to complete Reading II course. The test was planned and constructed on the foundation of existing theory of cloze test construction. A review of theory concerning reading comprehension, testing reading comprehension, and cloze testing led to the construction of the test, including the decision concerning how to score the test and to interpret the scores. Using a class of 28 students, the test was tried out a week after the mid-semester test was administered by the Reading II teacher. It was found that the test is sufficienty reliable on the basis of a reliability coefficient of .79 through split-half procedure and a coefficient value of .78 by K-R 20. The test also showed high inter-section correlation. The validity of the test was viewed in terms of face, content, and construct. The test scores correlate moderately with those obtained from the mid-semester test by the teacher. Some problems are discussed and a suggestion made with regard to a possible solution to these problems.

  10. Construction and test of the PRIOR proton microscope; Aufbau und Test des Protonenmikroskops PRIOR

    Energy Technology Data Exchange (ETDEWEB)

    Lang, Philipp-Michael

    2015-01-15

    The study of High Energy Density Matter (HEDM) in the laboratory makes great demands on the diagnostics because these states can usually only be created for a short time and usual diagnostic techniques with visible light or X-rays come to their limit because of the high density. The high energy proton radiography technique that was developed in the 1990s at the Los Alamos National Laboratory is a very promising possibility to overcome those limits so that one can measure the density of HEDM with high spatial and time resolution. For this purpose the proton microscope PRIOR (Proton Radiography for FAIR) was set up at GSI, which not only reproduces the image, but also magnifies it by a factor of 4.2 and thereby penetrates matter with a density up to 20 g/cm{sup 2}. Straightaway a spatial resolution of less than 30 μm and a time resolution on the nanosecond scale was achieved. This work describes details to the principle, design and construction of the proton microscope as well as first measurements and simulations of essential components like magnetic lenses, a collimator and a scintillator screen. For the latter one it was possible to show that plastic scintillators can be used as converter as an alternative to the slower but more radiation resistant crystals, so that it is possible to reach a time resolution of 10 ns. Moreover the characteristics were investigated for the system at the commissioning in April 2014. Also the changes in the magnetic field due to radiation damage were studied. Besides that an overview about future applications is given. First experiments with Warm Dense Matter created by using a Pulsed Power Setup have already been performed. Furthermore the promising concept of combining proton radiography with particle therapy has been investigated in context of the PaNTERA project. An outlook on the possibilities with future experiments at the FAIR accelerator facility is given as well. Because of higher beam intensity an energy one can expect even

  11. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... Energy (DOE) is amending its test procedures for residential water heaters, direct heating equipment (DHE... necessary for residential water heaters, because the existing test procedures for those products already...

  12. 76 FR 56347 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2011-09-13

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... proposed to amend, where appropriate, its test procedures for residential water heaters, direct heating... notes that the test procedure and metric for residential water heaters currently address and incorporate...

  13. Laboratory procedures for waste form testing

    International Nuclear Information System (INIS)

    Mast, E.S.

    1994-01-01

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory

  14. Laboratory procedures for waste form testing

    Energy Technology Data Exchange (ETDEWEB)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  15. K West basin isolation barrier leak rate test

    International Nuclear Information System (INIS)

    Whitehurst, R.; McCracken, K.; Papenfuss, J.N.

    1994-01-01

    This document establishes the procedure for performing the acceptance test on the two isolation barriers being installed in K West basin. This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals

  16. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  17. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  18. Random walks with shape prior for cochlea segmentation in ex vivo μCT

    DEFF Research Database (Denmark)

    Ruiz Pujadas, Esmeralda; Kjer, Hans Martin; Piella, Gemma

    2016-01-01

    Purpose Cochlear implantation is a safe and effective surgical procedure to restore hearing in deaf patients. However, the level of restoration achieved may vary due to differences in anatomy, implant type and surgical access. In order to reduce the variability of the surgical outcomes, we...... propose a new framework for cochlea segmentation in ex vivo μCT images using random walks where a distance-based shape prior is combined with a region term estimated by a Gaussian mixture model. The prior is also weighted by a confidence map to adjust its influence according to the strength of the image...... contour. Random walks is performed iteratively, and the prior mask is aligned in every iteration. Results We tested the proposed approach in ten μCT data sets and compared it with other random walks-based segmentation techniques such as guided random walks (Eslami et al. in Med Image Anal 17...

  19. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  20. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  1. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  2. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  3. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B H; Dam, J J.D. van; Delft, D R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  4. 40 CFR 92.123 - Test procedure; general requirements.

    Science.gov (United States)

    2010-07-01

    ... the test. Auxiliary fan(s) may be used to maintain engine cooling during operation on the dynamometer... smoke. (1) In the raw exhaust sampling procedure, sample is collected directly from the exhaust stream... of another raw exhaust sample. The fuel flow rate for each throttle setting is measured. (2) For...

  5. 40 CFR 86.1527 - Idle test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ... from a single exhaust pipe in which exhaust products are homogeneously mixed. The configuration for... additional “Y” pipe be placed in the exhaust system before dilution. [48 FR 52252, Nov. 16, 1983... determine the raw concentration (in percent) of CO in the exhaust flow at idle. The test procedure begins...

  6. The Alpha-defensin Test for Periprosthetic Joint Infections Is Not Affected by Prior Antibiotic Administration.

    Science.gov (United States)

    Shahi, Alisina; Parvizi, Javad; Kazarian, Gregory S; Higuera, Carlos; Frangiamore, Salvatore; Bingham, Joshua; Beauchamp, Christopher; Valle, Craig Della; Deirmengian, Carl

    2016-07-01

    Previous studies have demonstrated that the administration of antibiotics to patients before performing diagnostic testing for periprosthetic joint infection (PJI) can interfere with the accuracy of test results. Although a single-institution study has suggested that alpha-defensin maintains its concentration and sensitivity even after antibiotic treatment, this has not yet been demonstrated in a larger multiinstitutional study. (1) For the evaluation of PJI, is prior antibiotic administration associated with decreased alpha-defensin levels? (2) When prior antibiotics are given, is alpha-defensin a better screening test for PJI than the traditional tests (erythrocyte sedimentation rate [ESR], C-reactive protein [CRP], fluid white blood cells, fluid polymorphonuclear cells [PMNs], and fluid culture)? This retrospective study included data from 106 hip and knee arthroplasties with Musculoskeletal Infection Society-defined PJI from four centers. Of the 106 patients in this study, 30 (28%) were treated with antibiotics for PJI before diagnostic workup (ABX group), and 76 (72%) were not treated before the diagnostic workup (NO-ABX group). There were no differences in age, sex, joint, culture-negative rate, or bacteriology between groups. The patients in the ABX group had antibiotics initiated by physicians who commenced care before assessment for PJI by the treating surgeon's service. We compared the alpha-defensin levels and sensitivity between the ABX and NO-ABX groups. Additionally, the sensitivity of the alpha-defensin test was compared to that of traditional tests for PJI among patients on antibiotics. The administration of antibiotics before performing the alpha-defensin test for PJI was not associated with a decreased median alpha-defensin level (ABX group, median 4.2 [range, 1.79-12.8 S/CO] versus NO-ABX, median 4.9 [range, 0.5-16.8 S/CO], difference of medians: 0.68 S/CO [95% confidence interval {CI}, -0.98 to 1.26], p = 0.451). Furthermore, the alpha

  7. Reconnaissance On Chi-Square Test Procedure For Determining Two Species Association

    Science.gov (United States)

    Marisa, Hanifa

    2008-01-01

    Determining the assosiation of two species by using chi-square test has been published. Utility of this procedure to plants species at certain location, shows that the procedure could not find "ecologically" association. Tens sampling units have been made to record some weeds species in Indralaya, South Sumatera. Chi square test; Xt2 = N[|(ad)-(bc)|-(N/2)]2/mnrs (Eq:1) on two species (Cleome sp and Eleusine indica) of the weeds shows positive assosiation; while ecologically in nature, there is no relationship between them. Some alternatives are proposed to this problem; simplified chi-square test steps, make further study to find out ecologically association, or at last, ignore it.

  8. Procedure guideline for radioiodine test (version 3)

    International Nuclear Information System (INIS)

    Dietlein, M.; Schicha, H.; Eschner, W.; Deutsche Gesellschaft fuer Medizinische Physik; Koeln Univ.; Lassmann, M.; Deutsche Gesellschaft fuer Medizinische Physik; Wuerzburg Univ.; Leisner, B.; Allgemeines Krankenhaus St. Georg, Hamburg; Reiners, C.; Wuerzburg Univ.

    2007-01-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  9. Development test procedure High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    Development testing will be performed on the water jet cleaning fixture to determine the most effective arrangement of water jet nozzles to remove contamination from the surfaces of canisters and other debris. The following debris may be stained with dye to simulate surface contaminates: Mark O, Mark I, and Mark II Fuel Storage Canisters (both stainless steel and aluminum), pipe of various size, (steel, stainless, carbon steel and aluminum). Carbon steel and stainless steel plate, channel, angle, I-beam and other surfaces, specifically based on the Scientific Ecology Group (SEG) inventory and observations of debris within the basin. Test procedure for developmental testing of High Pressure Water Jet System

  10. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  11. Entropy Econometrics for combining regional economic forecasts: A Data-Weighted Prior Estimator

    Science.gov (United States)

    Fernández-Vázquez, Esteban; Moreno, Blanca

    2017-10-01

    Forecast combination has been studied in econometrics for a long time, and the literature has shown the superior performance of forecast combination over individual predictions. However, there is still controversy on which is the best procedure to specify the forecast weights. This paper explores the possibility of using a procedure based on Entropy Econometrics, which allows setting the weights for the individual forecasts as a mixture of different alternatives. In particular, we examine the ability of the Data-Weighted Prior Estimator proposed by Golan (J Econom 101(1):165-193, 2001) to combine forecasting models in a context of small sample sizes, a relative common scenario when dealing with time series for regional economies. We test the validity of the proposed approach using a simulation exercise and a real-world example that aims at predicting gross regional product growth rates for a regional economy. The forecasting performance of the Data-Weighted Prior Estimator proposed is compared with other combining methods. The simulation results indicate that in scenarios of heavily ill-conditioned datasets the approach suggested dominates other forecast combination strategies. The empirical results are consistent with the conclusions found in the numerical experiment.

  12. Quality assurance of radiopharmaceuticals - specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Colmanet, S.F.; Ivanov, Z.; Lauder, R.A.

    1990-10-01

    The authors report on a Radiopharmaceutical Quality Assurance Test Programme carried out by the Australian Radiation Laboratory in which radiopharmaceuticals used in nuclear medicine in Australia are tested for compliance with specifications. Where the radiopharmaceutical is the subject of a monograph in the British Pharmacopoeia or the European Pharmacopoeia, then the specifications given in the Pharmacopoeia are adopted. In other cases the specifications given have been adopted by this Laboratory and have no legal status. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods described have been developed at this Laboratory. It should be noted that, unless stated otherwise, specifications listed apply at all times up until product expire

  13. [Procedure of seed quality testing and seed grading standard of Prunus humilis].

    Science.gov (United States)

    Wen, Hao; Ren, Guang-Xi; Gao, Ya; Luo, Jun; Liu, Chun-Sheng; Li, Wei-Dong

    2014-11-01

    So far there exists no corresponding quality test procedures and grading standards for the seed of Prunus humilis, which is one of the important source of base of semen pruni. Therefor we set up test procedures that are adapt to characteristics of the P. humilis seed through the study of the test of sampling, seed purity, thousand-grain weight, seed moisture, seed viability and germination percentage. 50 cases of seed specimens of P. humilis tested. The related data were analyzed by cluster analysis. Through this research, the seed quality test procedure was developed, and the seed quality grading standard was formulated. The seed quality of each grade should meet the following requirements: for first grade seeds, germination percentage ≥ 68%, thousand-grain weight 383 g, purity ≥ 93%, seed moisture ≤ 5%; for second grade seeds, germination percentage ≥ 26%, thousand-grain weight ≥ 266 g, purity ≥ 73%, seed moisture ≤9%; for third grade seeds, germination percentage ≥ 10%, purity ≥ 50%, thousand-grain weight ≥ 08 g, seed moisture ≤ 13%.

  14. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  15. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  16. 40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test of Solvent Cleaning Procedures A... CATEGORIES National Emission Standards for Halogenated Solvent Cleaning Pt. 63, Subpt. T, App. A Appendix A to Subpart T of Part 63—Test of Solvent Cleaning Procedures General Questions ___ 1. What is the...

  17. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  18. Refreshing the Aged Latent Fingerprints with Ionizing Radiation Prior to the Cyanoacrylate Fuming Procedure: A Preliminary Study.

    Science.gov (United States)

    Ristova, Mimoza M; Radiceska, Pavlina; Bozinov, Igorco; Barandovski, Lambe

    2016-05-01

    One of the crucial factors determining the cyanoacrylate deposit quality over latent fingerprints appeared to be the extent of the humidity. This work focuses on the enhancement/refreshment of age-degraded latent fingerprints by irradiating the samples with UV, X-ray, or thermal neutrons prior to the cyanoacrylate (CA) fuming. Age degradation of latent fingerprints deposited on glass surfaces was examined through the decrease in the number of characteristic minutiae counts over time. A term "critical day" was introduced for the time at which the average number of identifiable minutiae definitions drops to one-half. Fingerprints older than their "critical day" were exposed to either UV, X-ray, or thermal neutrons. Identical reference samples were kept unexposed. All samples, both reference and irradiated, were developed during a single CA fuming procedure. Comparative latent fingerprint analysis showed that exposure to ionizing radiation enhances the CA fuming, yielding a 20-30% increase in average minutiae count. © 2015 American Academy of Forensic Sciences.

  19. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  20. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  1. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  2. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  4. Study on the effect of prior fatigue and creep-fatigue damage on the fatigue and creep characteristics of 316 FR stainless steel. 2nd report. The effect of prior creep-fatigue damage on the creep and fatigue characteristics

    International Nuclear Information System (INIS)

    Yamauchi, Masafumi; Chuman, Yasuharu; Otani, Tomomi; Takahashi, Yukio

    2001-01-01

    The effect of prior creep-fatigue damage on the creep and the fatigue characteristics was studied to investigate the creep-fatigue life evaluation procedure of 316FR stainless steel. Creep and fatigue tests were conducted at 550degC by using the specimen exposed to prior creep-fatigue cycles at the same temperature and interrupted at 1/4 Nf, 1/2 Nf and 3/4 Nf cycle. The creep and fatigue strength of the pre-damaged material showed monotonic reduction with the prior creep-fatigue damage compared with the virgin material. The creep ductility also showed monotonic reduction with the prior creep-fatigue damage. These results were evaluated by the stress-based Time Fraction Rule and the strain-based Ductility Exhaustion Method. The result showed that the application of the Ductility Exhaustion Method to the creep-fatigue damage evaluation is more promising than the Time Fraction Rule. (author)

  5. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation. The scope of this test procedure is to validate the operation of FRS and IWTS components as a complete system. Fuel canisters shall be processed in accordance with this test procedure such that fuel inspection results are clearly attributed to a particular set of PCM operating parameters. The Phase 3 test sequence processes a minimum of six canisters. Twenty-four contingency canisters have been identified, and will be processed if additional performance data are required. The Phase 4 test sequence processes a minimum of 29 specific canisters. Twenty-nine contingency canisters have been identified for Phase 4 activities and will be processed to complete process validation, if

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  15. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  16. The minimal ice water caloric test compared with established vestibular caloric test procedures.

    Science.gov (United States)

    Schmäl, Frank; Lübben, Björn; Weiberg, Kerstin; Stoll, Wolfgang

    2005-01-01

    Caloric testing of the vestibular labyrinth is usually performed by classical caloric test procedures (CCTP) using water warmed to 30 degrees C and 44 degrees C. Ice water irrigation (4 degrees C) is usually not performed, although it might be useful as a bedside test. To verify the validity of the Minimal Ice Water Caloric Test (MIWCT), comparative video-oculographic investigations were performed in 22 healthy subjects using ice water (0.5 ml, 1.0 ml, 2 ml), CCTP, and cold air (27 degrees C). Frequency, amplitude, slow phase velocity (SPV), the onset, and the duration of nystagmus were documented. After addition of three ice cubes, the temperature of conventional tap water (16 degrees C) fell within 13 min to 4 degrees C. In pessimum position the subjects demonstrated no nystagmus response. Compared to CCTP, MIWCT was associated with a significantly later onset of nystagmus and a significant prolongation of the nystagmus reaction. In contrast to air stimulation (27 degrees C), a significant Spearman's correlation was noted between MIWCT (1 and 2 ml) and established CCTP in respect of essential nystagmus parameters (frequency, amplitude and SPV). Furthermore, MIWCT (0.5 and 1 ml) showed a higher sensitivity and specificity with regard to the detection of canal paresis based on Jongkees' formula compared to stimulation with air 27 degrees C. Thus, MIWCT appears to be a suitable procedure for bedside investigation of vestibular function outside the vestibular laboratory, e.g. in a hospital ward, where bedridden patients with vertigo occasionally require vestibular testing.

  17. Memory and other properties of multiple test procedures generated by entangled graphs.

    Science.gov (United States)

    Maurer, Willi; Bretz, Frank

    2013-05-10

    Methods for addressing multiplicity in clinical trials have attracted much attention during the past 20 years. They include the investigation of new classes of multiple test procedures, such as fixed sequence, fallback and gatekeeping procedures. More recently, sequentially rejective graphical test procedures have been introduced to construct and visualize complex multiple test strategies. These methods propagate the local significance level of a rejected null hypothesis to not-yet rejected hypotheses. In the graph defining the test procedure, hypotheses together with their local significance levels are represented by weighted vertices and the propagation rule by weighted directed edges. An algorithm provides the rules for updating the local significance levels and the transition weights after rejecting an individual hypothesis. These graphical procedures have no memory in the sense that the origin of the propagated significance level is ignored in subsequent iterations. However, in some clinical trial applications, memory is desirable to reflect the underlying dependence structure of the study objectives. In such cases, it would allow the further propagation of significance levels to be dependent on their origin and thus reflect the grouped parent-descendant structures of the hypotheses. We will give examples of such situations and show how to induce memory and other properties by convex combination of several individual graphs. The resulting entangled graphs provide an intuitive way to represent the underlying relative importance relationships between the hypotheses, are as easy to perform as the original individual graphs, remain sequentially rejective and control the familywise error rate in the strong sense. Copyright © 2012 John Wiley & Sons, Ltd.

  18. 16 CFR 1501.4 - Size requirements and test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Size requirements and test procedure. 1501.4 Section 1501.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT.... The metric approximations are included only for convenience.) (b)(1) Place the article, without...

  19. Test procedures and instructions for Hanford tank waste supernatant cesium removal

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

  20. A Bayesian decision procedure for testing multiple hypotheses in DNA microarray experiments.

    Science.gov (United States)

    Gómez-Villegas, Miguel A; Salazar, Isabel; Sanz, Luis

    2014-02-01

    DNA microarray experiments require the use of multiple hypothesis testing procedures because thousands of hypotheses are simultaneously tested. We deal with this problem from a Bayesian decision theory perspective. We propose a decision criterion based on an estimation of the number of false null hypotheses (FNH), taking as an error measure the proportion of the posterior expected number of false positives with respect to the estimated number of true null hypotheses. The methodology is applied to a Gaussian model when testing bilateral hypotheses. The procedure is illustrated with both simulated and real data examples and the results are compared to those obtained by the Bayes rule when an additive loss function is considered for each joint action and the generalized loss 0-1 function for each individual action. Our procedure significantly reduced the percentage of false negatives whereas the percentage of false positives remains at an acceptable level.

  1. Assessment of Prior Learning in Adult Vocational Education and Training

    Directory of Open Access Journals (Sweden)

    Vibe Aarkrog

    2015-04-01

    Full Text Available The article deals about the results of a study of school-based Assessment of Prior Learning of adults who have enrolled as students in a VET college in order to qualify for occupations as skilled workers. Based on examples of VET teachers’ methods for assessing the students’ prior learning in the programs for gastronomes, respectively child care assistants the article discusses two issues in relation to Assessment of Prior Learing: the encounter of practical experience and school-based knowledge and the validity and reliability of the assessment procedures. Through focusing on the students’ knowing that and knowing why the assessment is based on a scholastic perception of the students’ needs for training, reflecting one of the most important challenges in Assessment of Prior Learning: how can practical experience be transformed into credits for the knowledge parts of the programs? The study shows that by combining several Assessment of Prior Learning methods and comparing the teachers’ assessments the teachers respond to the issues of validity and reliability. However, validity and reliability might be even further strengthened, if the competencies are well defined, if the education system is aware of securing a reasonable balance between knowing how, knowing that, and knowing why, and if the teachers are adequately trained for the assessment procedures.

  2. 75 FR 42611 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... current active mode provisions in its test procedure for microwave ovens do not produce accurate and... concerns with the DOE microwave oven cooking efficiency test procedure. Elsewhere in today's Federal...

  3. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  4. Procedure for vibration test of the fuel rod supported by spacer grids

    International Nuclear Information System (INIS)

    Choi, Myoung Hwan; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Song, Kee Nam

    2002-07-01

    One of the methods that are used to compare and verify the supporting performance of the spacer grids developed is the vibration characteristic test. In this report there are two aims. One is of the understand of the experimental method and procedure performing the modal testing using I-DEAS TDAS module. The other is the investigation of the vibration behaviors of a dummy fuel rod supported by 8 optimized H type spacer grids. This report describes the method and procedure of modal testing to obtain the vibration characteristics such as amplitudes, natural frequencies and mode shapes of the fuel rod using a shaker, a non-contact gap sensor and an accelerometer. This report provides a test procedure in detail so that anyone can be easily understood and use the I-DEAS TDAS program. The I-DEAS TDAS program related to the modal testing has several tasks including the Modal analysis, Signal Processing et al.. This report includes model preparation to prepare the geometrical model, Signal Processing (Sine/Standard measurement) to acquire the signal, Modal analysis to obtain the frequencies and mode shapes, Correlation to analyze the relation between the test and FE analysis and Post Processing tasks. In addition, this report contains the actual test and analysis data of a dummy fuel rod in length 3847mm supported by 8 optimized H type spacer grids

  5. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  6. Reliability demonstration test planning using bayesian analysis

    International Nuclear Information System (INIS)

    Chandran, Senthil Kumar; Arul, John A.

    2003-01-01

    In Nuclear Power Plants, the reliability of all the safety systems is very critical from the safety viewpoint and it is very essential that the required reliability requirements be met while satisfying the design constraints. From practical experience, it is found that the reliability of complex systems such as Safety Rod Drive Mechanism is of the order of 10 -4 with an uncertainty factor of 10. To demonstrate the reliability of such systems is prohibitive in terms of cost and time as the number of tests needed is very large. The purpose of this paper is to develop a Bayesian reliability demonstrating testing procedure for exponentially distributed failure times with gamma prior distribution on the failure rate which can be easily and effectively used to demonstrate component/subsystem/system reliability conformance to stated requirements. The important questions addressed in this paper are: With zero failures, how long one should perform the tests and how many components are required to conclude with a given degree of confidence, that the component under test, meets the reliability requirement. The procedure is explained with an example. This procedure can also be extended to demonstrate with more number of failures. The approach presented is applicable for deriving test plans for demonstrating component failure rates of nuclear power plants, as the failure data for similar components are becoming available in existing plants elsewhere. The advantages of this procedure are the criterion upon which the procedure is based is simple and pertinent, the fitting of the prior distribution is an integral part of the procedure and is based on the use of information regarding two percentiles of this distribution and finally, the procedure is straightforward and easy to apply in practice. (author)

  7. 75 FR 42612 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy... (NOPR) in which DOE proposed test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to measure standby mode and off mode power use by microwave ovens. To address issues...

  8. 40 CFR 1051.501 - What procedures must I use to test my vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... vehicles or engines? 1051.501 Section 1051.501 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test Procedures § 1051.501 What procedures must I use to test my vehicles or engines? This section describes test...

  9. Iterated random walks with shape prior

    DEFF Research Database (Denmark)

    Pujadas, Esmeralda Ruiz; Kjer, Hans Martin; Piella, Gemma

    2016-01-01

    the parametric probability density function. Then, random walks is performed iteratively aligning the prior with the current segmentation in every iteration. We tested the proposed approach with natural and medical images and compared it with the latest techniques with random walks and shape priors......We propose a new framework for image segmentation using random walks where a distance shape prior is combined with a region term. The shape prior is weighted by a confidence map to reduce the influence of the prior in high gradient areas and the region term is computed with k-means to estimate....... The experiments suggest that this method gives promising results for medical and natural images....

  10. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  11. Procedure on the Impact Characteristic Test for the One-sided and Thru-grid Spacer Grid

    International Nuclear Information System (INIS)

    Yoon, Kyung Ho; Kim, Jae Yong; Lee, Kang Hee; Song, Kee Nam

    2006-09-01

    In order to perform the one-sided and the through-grid impact tests for a new developed spacer grid, the drop type impact test machines were established. The dynamic impact test is to get some basic data for accident analysis such as impact strength, stiffness, and coefficient of the restitution. Furthermore, these developed test methods and procedures will be qualified standard for increasing the reliability of the test results. Chapter 2 provides an introduction to the test facilities and instrumentations. Chapter 3 describes on how spacer grid and the single span fuel assembly specimen will be prepared. In addition to this, how to set up these testing machines. Chapter 4 illustrates detail test procedure on how to acquire impact signal of the two kinds of the specimen. Chapter 5 deals with signal processing and analysis for the test data. Finally, chapter 6 summarise the overall test procedure and the test method

  12. 76 FR 12825 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2011-03-09

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy.... Department of Energy (DOE) is amending its test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to provide for the measurement of standby mode and off mode power use by microwave...

  13. Preschooler test or procedure preparation

    Science.gov (United States)

    ... your child during and after the procedure with books, songs, counting, deep breathing, or blowing bubbles. PLAY ... can be present during the procedure. Ask if anesthesia can be used to reduce your child's discomfort. ...

  14. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  15. Specifications and test procedures for airline-type supplied-air suits

    International Nuclear Information System (INIS)

    Revoir, W.H.; Pritchard, J.A.; Davis, T.O.; Richards, C.P.; Wheat, L.D.

    1975-05-01

    Procedures and requirements have been established to permit airline-type supplied-air suits needed by contractors of the Energy Research and Development Administration to be tested for performance by the Respirator Research and Development Section, Industrial Hygiene Group, of the Los Alamos Scientific Laboratory, and to have the adequacy of the performance of these devices evaluated by the Los Alamos Scientific Laboratory Respirator Advisory Committee. Test equipment, test methods, and performance criteria for airline-type supplied-air suits are prescribed. (U.S.)

  16. SMELL-S and SMELL-R: olfactory tests not influenced by odor-specific insensitivity or prior olfactory experience

    OpenAIRE

    Keller, Andreas; Wong, Michele; Jiang, Rong-San; Vosshall, Leslie; Hsieh, Julien

    2017-01-01

    Smell dysfunction is a common and underdiagnosed medical condition that can have serious consequences. It is also an early biomarker of Alzheimer's disease that precedes detectable memory loss. Clinical tests that evaluate the sense of smell face two major challenges. First, human sensitivity to individual odorants varies significantly, leading to potential misdiagnosis of people with an otherwise normal sense of smell but insensitivity to the test odorant. Second, prior familiarity with odor...

  17. 10 CFR 431.444 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.444 Section 431.444 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... procedures for the measurement of energy efficiency. (a) Scope. Pursuant to section 346(b)(1) of EPCA, this...

  18. 49 CFR 572.124 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... test procedure in paragraph (c) of this section: (1) The maximum sternum displacement (compression... displacement but before reaching the minimum required 38.0 mm (1.5 in) sternum displacement limit shall not exceed 1500 N (337.2 lbf). (2) The internal hysteresis of the ribcage in each impact as determined by the...

  19. Motor Skills Enhance Procedural Memory Formation and Protect against Age-Related Decline.

    Science.gov (United States)

    Müller, Nils C J; Genzel, Lisa; Konrad, Boris N; Pawlowski, Marcel; Neville, David; Fernández, Guillén; Steiger, Axel; Dresler, Martin

    2016-01-01

    The ability to consolidate procedural memories declines with increasing age. Prior knowledge enhances learning and memory consolidation of novel but related information in various domains. Here, we present evidence that prior motor experience-in our case piano skills-increases procedural learning and has a protective effect against age-related decline for the consolidation of novel but related manual movements. In our main experiment, we tested 128 participants with a sequential finger-tapping motor task during two sessions 24 hours apart. We observed enhanced online learning speed and offline memory consolidation for piano players. Enhanced memory consolidation was driven by a strong effect in older participants, whereas younger participants did not benefit significantly from prior piano experience. In a follow up independent control experiment, this compensatory effect of piano experience was not visible after a brief offline period of 30 minutes, hence requiring an extended consolidation window potentially involving sleep. Through a further control experiment, we rejected the possibility that the decreased effect in younger participants was caused by training saturation. We discuss our results in the context of the neurobiological schema approach and suggest that prior experience has the potential to rescue memory consolidation from age-related cognitive decline.

  20. ASK Procedure for Instrumented Pre-cracked Charpy-Type Tests

    International Nuclear Information System (INIS)

    Varga, T.; Njo, D.H.; Prantl, G.

    1981-01-01

    The essential technical content of the ASK procedure originated from development work in Switzerland since 1963, and practical experiences gained since 1972. The remainder of the content and the format of the procedure are based on the ASTM E 24.03.03. (Tentative Draft Copy) 'Proposed Method for Pre-cracked Charpy Impact and Slow-Bend Testing of Metallic Materials' by C. E. Harbower, 1973. Two different velocities, 5 m/s and 0.1 m/s were used with a Schnadt-type machine of rigid construction. The stiffness of the machine proved to be very suitable for instrumented testing. The instrumented Schnadt-Type machine was equipped with strain gauges both on the top of the pendulum and on the chisel. A static force calibration was followed by energy calibration, comparing potential energy losses with the area under the force-deflection curve. Deflection was measured using a high frequency eddy current method on the pendulum, and for slow testing by means of an inductive gauge on the chisel. Charpy-Type specimens of 1.0 mm max notch depth and 0.12 mm max notch radius were pre-cracked using a resonant fatigue testing machine, or an eccentric drive machine. Crack propagation rate da/dN was measured using 'Russenberger' measuring gauges. In addition a new technique for the detection of dynamic crack initiation, developed at the Institute of Research and Technology (TVFA) in Vienna is discussed and some results presented

  1. Statistical approach for collaborative tests, reference material certification procedures

    International Nuclear Information System (INIS)

    Fangmeyer, H.; Haemers, L.; Larisse, J.

    1977-01-01

    The first part introduces the different aspects in organizing and executing intercomparison tests of chemical or physical quantities. It follows a description of a statistical procedure to handle the data collected in a circular analysis. Finally, an example demonstrates how the tool can be applied and which conclusion can be drawn of the results obtained

  2. A procedure for the significance testing of unmodeled errors in GNSS observations

    Science.gov (United States)

    Li, Bofeng; Zhang, Zhetao; Shen, Yunzhong; Yang, Ling

    2018-01-01

    It is a crucial task to establish a precise mathematical model for global navigation satellite system (GNSS) observations in precise positioning. Due to the spatiotemporal complexity of, and limited knowledge on, systematic errors in GNSS observations, some residual systematic errors would inevitably remain even after corrected with empirical model and parameterization. These residual systematic errors are referred to as unmodeled errors. However, most of the existing studies mainly focus on handling the systematic errors that can be properly modeled and then simply ignore the unmodeled errors that may actually exist. To further improve the accuracy and reliability of GNSS applications, such unmodeled errors must be handled especially when they are significant. Therefore, a very first question is how to statistically validate the significance of unmodeled errors. In this research, we will propose a procedure to examine the significance of these unmodeled errors by the combined use of the hypothesis tests. With this testing procedure, three components of unmodeled errors, i.e., the nonstationary signal, stationary signal and white noise, are identified. The procedure is tested by using simulated data and real BeiDou datasets with varying error sources. The results show that the unmodeled errors can be discriminated by our procedure with approximately 90% confidence. The efficiency of the proposed procedure is further reassured by applying the time-domain Allan variance analysis and frequency-domain fast Fourier transform. In summary, the spatiotemporally correlated unmodeled errors are commonly existent in GNSS observations and mainly governed by the residual atmospheric biases and multipath. Their patterns may also be impacted by the receiver.

  3. EFAM GTP 02 - the GKSS test procedure for determining the fracture behaviour of materials

    International Nuclear Information System (INIS)

    Schwalbe, K.H.; Heerens, J.; Zerbst, U.; Kocak, M.

    2002-01-01

    This document describes a unified fracture mechanics test method in procedural form for quasi-static testing of materials. It is based on the ESIS Procedures P1 and P2 and introduces additional features, such as middle cracked tension specimens, shallow cracks, the δ 5 crack tip opening displacement, the crack tip opening angle, the rate of dissipated energy, testing of weldments, and guidance for statistical treatment of scatter. Special validity criteria are given for tests on specimens with low constraint. This document represents an updated version of EFAM GTP 94. (orig.) [de

  4. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  5. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  6. Equating Multidimensional Tests under a Random Groups Design: A Comparison of Various Equating Procedures

    Science.gov (United States)

    Lee, Eunjung

    2013-01-01

    The purpose of this research was to compare the equating performance of various equating procedures for the multidimensional tests. To examine the various equating procedures, simulated data sets were used that were generated based on a multidimensional item response theory (MIRT) framework. Various equating procedures were examined, including…

  7. 77 FR 28673 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans

    Science.gov (United States)

    2012-05-15

    ... multipliers based on climate, consumer behavior assumptions, and product characteristics (e.g., multi-stage or... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans; Proposed Rule #0;#0... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans AGENCY: Office of...

  8. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  9. A simplified test procedure for determining the effectiveness of adsorbents for the removal of methyl iodide

    International Nuclear Information System (INIS)

    Underhill, D.W.

    1993-01-01

    ASTM Test Procedure D3803 measures the ability of nuclear-grade carbon to remove methyl iodide from a stream of humidified air. This test, unlike all the other procedures developed by ASTM Committee D28, has evolved to become extremely complex. The intricacy of this test as well as the great difficulty in obtaining inter-laboratory agreement, creates doubt as tot the actual meaning of the results. Here a far simpler test system is described in which thermodynamic principles are used to maintain a constant, reproducible test procedure. This paper describes a system implementing these elements, its cost to build, and the factors affecting its accuracy. 11 refs., 1 fig

  10. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  11. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  13. Dispersant field testing : a review of procedures and considerations

    International Nuclear Information System (INIS)

    Fingas, M.F.

    2004-01-01

    The effectiveness of a dispersant is defined by the amount of oil that the dispersant puts into the water column compared to the amount of oil that was initially spilled. Effectiveness is generally determined visually in plumes of dispersed oil that are visible from ships and aircraft. This paper describes 25 specific issues and technical concerns regarding field testing of dispersant effectiveness. Recent field tests were reviewed and literature that relates to testing procedures was sited. The 25 factors that are important for the appropriate outcome of dispersant field experiments include: mass balance; proper controls; analytical method; differential plume movement; time lag and length of time followed; mathematics of calculation and integration; lower and upper limits of analytical methods; use of remote sensing; thickness measurement; behaviour of oil with surfactant content; surfactant stripping; tracking surface oil and dispersed oil; recovering surface oil; visibility of oil from the surface; background levels of hydrocarbons; fluorescence of dispersant; herding; emulsion breaking; application success; heterogeneity of slick and plume; deposition measurements; true analytical standards; effect of wind on dispersant and slick; dispersant run-off; and weathering of the oil. It was concluded that the most important factors are the ability to determine mass balance, use proper controls, analytical methods and to avoid procedures that give incorrect results. 34 refs., 4 tabs., 1 fig

  14. Communication with patients during the prenatal testing procedure: an explorative qualitative study

    NARCIS (Netherlands)

    van Zwieten, Myra; Willems, Dick; Knegt, Lia; Leschot, Nico

    2006-01-01

    OBJECTIVE: While generally two phases of prenatal genetic counseling are distinguished, i.e. pre- and post-test counseling, we revealed a third form of communication during the testing procedure. The content of this intermediate communication was explored. METHODS: A secondary analysis was performed

  15. Alternative procedure for the cold test for soybean seeds Procedimento alternativo para o teste de frio em semente de soja

    Directory of Open Access Journals (Sweden)

    Bruno Guilherme Torres Licursi Vieira

    2010-10-01

    Full Text Available The growing demand for high quality soybean [Glycine max (L. Merrill] seeds requires a precise seed quality control system from the seed industry. One way to accomplish this is by improving vigor testing. Cold test has been traditionally employed for corn seeds. However, it has also been used for other seed crops such as cotton (Gossypium spp., soybean (Glycine Max, dry bean (Phaseolus vulgaris and pea (Pisum sativum. This study was carried out with the objective of adjusting an alternative procedure for the cold test to determine soybean seed vigor. Six commercial soybean seed lots of the cultivar BRS 133 were used. The physiological potential of the seed lots was evaluated by germination on paper towel and sand box, seedling field emergence, tetrazolium, accelerated aging and electrical conductivity tests. Seed moisture content was also determined. The temperature used for the cold test procedures was 10ºC during five days. Four cold test procedures were evaluated: i plastic boxes with soil; ii rolled paper towel with soil; iii rolled paper towel without soil, and iv an alternative procedure, using rolled paper towel without soil under cold water. A completely randomized experimental design with eight replications was used and the means were compared by the Tukey test (p = 0.05. To verify the dependence between the alternative test and others single linear correlation was used. All cold test procedures had similar coefficients of variation (CV, highlighting that rolled paper towel with soil and the alternative procedure had the best performance, with an average of 94% and 93% normal seedlings and CV of 3.2% and 3.6%, respectively. The alternative procedure has satisfactory results for estimating soybean seed vigor, yielding consistent results compared to the traditional procedure.A crescente demanda por semente de soja [Glycine max (L. Merrill] de alta qualidade tem requerido da indústria de sementes um controle de qualidade mais preciso

  16. [Absolute numbers of peripheral blood CD34+ hematopoietic stem cells prior to a leukapheresis procedure as a parameter predicting the efficiency of stem cell collection].

    Science.gov (United States)

    Galtseva, I V; Davydova, Yu O; Gaponova, T V; Kapranov, N M; Kuzmina, L A; Troitskaya, V V; Gribanova, E O; Kravchenko, S K; Mangasarova, Ya K; Zvonkov, E E; Parovichnikova, E N; Mendeleeva, L P; Savchenko, V G

    To identify a parameter predicting a collection of at least 2·106 CD34+ hematopoietic stem cells (HSC)/kg body weight per leukapheresis (LA) procedure. The investigation included 189 patients with hematological malignancies and 3 HSC donors, who underwent mobilization of stem cells with their subsequent collection by LA. Absolute numbers of peripheral blood leukocytes and CD34+ cells before a LA procedure, as well as a number of CD34+ cells/kg body weight (BW) in the LA product stored on the same day were determined in each patient (donor). There was no correlation between the number of leukocytes and that of stored CD34+ cells/kg BW. There was a close correlation between the count of peripheral blood CD34+ cells prior to LA and that of collected CD34+ cells calculated with reference to kg BW. The optimal absolute blood CD34+ cell count was estimated to 20 per µl, at which a LA procedure makes it possible to collect 2·106 or more CD34+ cells/kg BW.

  17. In situ impulse test: an experimental and analytical evaluation of data interpretation procedures

    International Nuclear Information System (INIS)

    1975-08-01

    Special experimental field testing and analytical studies were undertaken at Fort Lawton in Seattle, Washington, to study ''close-in'' wave propagation and evaluate data interpretation procedures for a new in situ impulse test. This test was developed to determine the shear wave velocity and dynamic modulus of soils underlying potential nuclear power plant sites. The test is different from conventional geophysical testing in that the velocity variation with strain is determined for each test. In general, strains between 10 -1 and 10 -3 percent are achieved. The experimental field work consisted of performing special tests in a large test sand fill to obtain detailed ''close-in'' data. Six recording transducers were placed at various points on the energy source, while approximately 37 different transducers were installed within the soil fill, all within 7 feet of the energy source. Velocity measurements were then taken simultaneously under controlled test conditions to study shear wave propagation phenomenology and help evaluate data interpretation procedures. Typical test data are presented along with detailed descriptions of the results

  18. 40 CFR 63.1365 - Test methods and initial compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... permit limit applicable to the process vent. (D) Design analysis based on accepted chemical engineering... concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design... procedures specified in Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical...

  19. 75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD64 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... required method. However, in response to comments requesting additional flexibility in testing methods, the... may increase flexibility and lower costs for employers who choose to use them over more expensive...

  20. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs

  1. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  2. Automation of electromagnetic compatability (EMC) test facilities

    Science.gov (United States)

    Harrison, C. A.

    1986-01-01

    Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.

  3. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ''1/0 MODULE HEALTH STATUS'', ''MININ1'', and ''MININ2'' screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure

  4. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs

  5. Pharmacogenetic testing prior to carbamazepine treatment of epilepsy: patients' and physicians' preferences for testing and service delivery.

    Science.gov (United States)

    Powell, Graham; Holmes, Emily A F; Plumpton, Catrin O; Ring, Adele; Baker, Gus A; Jacoby, Ann; Pirmohamed, Munir; Marson, Anthony G; Hughes, Dyfrig A

    2015-11-01

    Pharmacogenetic studies have identified the presence of the HLA-A*31:01 allele as a predictor of cutaneous adverse drugs reactions (ADRs) to carbamazepine. This study aimed to ascertain the preferences of patients and clinicians to inform carbamazepine pharmacogenetic testing services. Attributes of importance to people with epilepsy and neurologists were identified through interviews and from published sources. Discrete choice experiments (DCEs) were conducted in 82 people with epilepsy and 83 neurologists. Random-effects logit regression models were used to determine the importance of the attributes and direction of effect. In the patient DCE, all attributes (seizure remission, reduction in seizure frequency, memory problems, skin rash and rare, severe ADRs) were significant. The estimated utility of testing was greater, at 0.52 (95% CI 0.19, 1.00) than not testing at 0.33 (95% CI -0.07, 0.81). In the physician DCE, cost, inclusion in the British National Formulary, coverage, negative predictive value (NPV) and positive predictive value (PPV) were significant. Marginal rates of substitution indicated that neurologists were willing to pay £5.87 for a 1 percentage point increase in NPV and £3.99 for a 1 percentage point increase in PPV. The inclusion of both patients' and clinicians' perspectives represents an important contribution to the understanding of preferences towards pharmacogenetic testing prior to initiating carbamazepine. Both groups identified different attributes but had generally consistent preferences. Patients' acceptance of a decrease in treatment benefit for a reduced chance of severe ADRs adds support for the implementation of HLA-A*31:01 testing in routine practice. © 2015 The British Pharmacological Society.

  6. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1994-01-01

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified

  7. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  8. A rapid radioimmunoassay for insulin suitable for testing pancreatic tissue prior to transplantation

    International Nuclear Information System (INIS)

    Besch, W.; Kohnert, K.-D.; Hahn, H.-J.; Ziegler, M.; Lorenz, D.

    1984-01-01

    One way of diabetes mellitus treatment is the transplantation of insulin-producing tissue. As islet or pancreas transplantation has made progress, testing of the tissue for its vitality, insulin content and insulin secretory response prior to transplantation became necessary. Apart from problems of rejection of allografted tissue, improvement of the patients metabolic control partly depends on the insulin content of the tissue transplanted. It was the aim of the present work to establish a radioimmunoassay which ensures rapid determination of immunoreactive insulin concentrations (IRI) either intracellularly-stored or released upon stimulation of human pancreas or islet with glucose, and to demonstrate the useful application of this assay for the assessment of transplantable tissue. (Auth.)

  9. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  10. 77 FR 28519 - Test Procedure Guidance for Room Air Conditioners, Residential Dishwashers, and Residential...

    Science.gov (United States)

    2012-05-15

    ... Guidance for Room Air Conditioners, Residential Dishwashers, and Residential Clothes Washers: Public... procedures for room air conditioners, residential dishwashers, and residential clothes washers. DATES: DOE...'s existing test procedures for residential room air conditioners, residential dishwashers, and...

  11. Operability test report for core sample truck number one flammable gas modifications

    International Nuclear Information System (INIS)

    Akers, J.C.

    1997-01-01

    This report primarily consists of the original test procedure used for the Operability Testing of the flammable gas modifications to Core Sample Truck No. One. Included are exceptions, resolutions, comments, and test results. This report consists of the original, completed, test procedure used for the Operability Testing of the flammable gas modifications to the Push Mode Core Sample Truck No. 1. Prior to the Acceptance/Operability test the truck No. 1 operations procedure (TO-080-503) was revised to be more consistent with the other core sample truck procedures and to include operational steps/instructions for the SR weather cover pressurization system. A draft copy of the operations procedure was used to perform the Operability Test Procedure (OTP). A Document Acceptance Review Form is included with this report (last page) indicating the draft status of the operations procedure during the OTP. During the OTP 11 test exceptions were encountered. Of these exceptions four were determined to affect Acceptance Criteria as listed in the OTP, Section 4.7 ACCEPTANCE CRITERIA

  12. Some Remarks on Foundation Pile Testing Procedures

    Science.gov (United States)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  13. 76 FR 69869 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2011-11-09

    ... ensure that the test procedure is representative of consumer behavior and repeatable among different test... would not be factored into its energy efficiency rating. This would imply that consumer behavior would... previous section, DOE does not have data to verify how consumers may adjust their behavior based on the...

  14. Assessment of prior learning in vocational education and training

    DEFF Research Database (Denmark)

    Wahlgren, Bjarne; Aarkrog, Vibe

    ’ knowledge, skills and competences during the students’ performances and the methods that the teachers apply in order to assess the students’ prior learning in relation to the regulations of the current VET-program. In particular the study focuses on how to assess not only the students’ explicated knowledge......The article deals about the results of a study of the assessment of prior learning among adult workers who want to obtain formal qualifications as skilled workers. The study contributes to developing methods for assessing prior learning including both the teachers’ ways of eliciting the students...... and skills but also their competences, i.e. the way the students use their skills and knowledge to perform in practice. Based on a description of the assessment procedures the article discusses central issues in relation to the assessment of prior learning. The empirical data have been obtained in the VET...

  15. 26 CFR 302.1-3 - Protection of internal revenue prior to tax determination.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) PROCEDURE AND ADMINISTRATION TAXES UNDER THE INTERNATIONAL CLAIMS SETTLEMENT ACT, AS AMENDED AUGUST 9, 1955 § 302.1-3 Protection of internal revenue prior to tax determination. (a) Suits and claims... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Protection of internal revenue prior to tax...

  16. Testability evaluation using prior information of multiple sources

    Institute of Scientific and Technical Information of China (English)

    Wang Chao; Qiu Jing; Liu Guanjun; Zhang Yong

    2014-01-01

    Testability plays an important role in improving the readiness and decreasing the life-cycle cost of equipment. Testability demonstration and evaluation is of significance in measuring such testability indexes as fault detection rate (FDR) and fault isolation rate (FIR), which is useful to the producer in mastering the testability level and improving the testability design, and helpful to the consumer in making purchase decisions. Aiming at the problems with a small sample of testabil-ity demonstration test data (TDTD) such as low evaluation confidence and inaccurate result, a test-ability evaluation method is proposed based on the prior information of multiple sources and Bayes theory. Firstly, the types of prior information are analyzed. The maximum entropy method is applied to the prior information with the mean and interval estimate forms on the testability index to obtain the parameters of prior probability density function (PDF), and the empirical Bayesian method is used to get the parameters for the prior information with a success-fail form. Then, a parametrical data consistency check method is used to check the compatibility between all the sources of prior information and TDTD. For the prior information to pass the check, the prior credibility is calculated. A mixed prior distribution is formed based on the prior PDFs and the corresponding credibility. The Bayesian posterior distribution model is acquired with the mixed prior distribution and TDTD, based on which the point and interval estimates are calculated. Finally, examples of a flying control system are used to verify the proposed method. The results show that the proposed method is feasible and effective.

  17. New test procedure to determine fuel's knock resistance; Neues Kraftstoffpruefverfahren zur Bestimmung der Klopffestigkeit

    Energy Technology Data Exchange (ETDEWEB)

    Huber, Karl [Hochschule Ingolstadt (Germany). Thermodynamik und Verbrennungsmotoren; Hauber, Johann; Raba, Andreas [Hochschule Ingolstadt (Germany). Inst. fuer Angewandte Forschung; Nell, Robert [Rofa Laboratory and Process Analyzers, Kritzendorf (Austria). Bereich Produktentwicklung

    2013-07-15

    Knock resistance is one of the most important quality features of gasoline that is determined by standardised motor test procedures. These procedures were developed more than 80 years ago and have been used nearly unchanged since then. During a four-year research project at Ingolstadt University of Applied Sciences, the procedures for determination of octane numbers were analysed in order to develop a new engine-based test method. (orig.)

  18. Standard Test Method for Testing Nonmetallic Seal Materials by Immersion in a Simulated Geothermal Test Fluid

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1985-01-01

    1.1 This test method covers a procedure for a laboratory test for performing an initial evaluation (screening) of nonmetallic seal materials by immersion in a simulated geothermal test fluid. 1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see Section 6 and 11.7.

  19. CMOS gate array characterization procedures

    Science.gov (United States)

    Spratt, James P.

    1993-09-01

    Present procedures are inadequate for characterizing the radiation hardness of gate array product lines prior to personalization because the selection of circuits to be used, from among all those available in the manufacturer's circuit library, is usually uncontrolled. (Some circuits are fundamentally more radiation resistant than others.) In such cases, differences in hardness can result between different designs of the same logic function. Hardness also varies because many gate arrays feature large custom-designed megacells (e.g., microprocessors and random access memories-MicroP's and RAM's). As a result, different product lines cannot be compared equally. A characterization strategy is needed, along with standardized test vehicle(s), methodology, and conditions, so that users can make informed judgments on which gate arrays are best suited for their needs. The program described developed preferred procedures for the radiation characterization of gate arrays, including a gate array evaluation test vehicle, featuring a canary circuit, designed to define the speed versus hardness envelope of the gate array. A multiplier was chosen for this role, and a baseline multiplier architecture is suggested that could be incorporated into an existing standard evaluation circuit chip.

  20. Lung cancer gene expression database analysis incorporating prior knowledge with support vector machine-based classification method

    Directory of Open Access Journals (Sweden)

    Huang Desheng

    2009-07-01

    Full Text Available Abstract Background A reliable and precise classification is essential for successful diagnosis and treatment of cancer. Gene expression microarrays have provided the high-throughput platform to discover genomic biomarkers for cancer diagnosis and prognosis. Rational use of the available bioinformation can not only effectively remove or suppress noise in gene chips, but also avoid one-sided results of separate experiment. However, only some studies have been aware of the importance of prior information in cancer classification. Methods Together with the application of support vector machine as the discriminant approach, we proposed one modified method that incorporated prior knowledge into cancer classification based on gene expression data to improve accuracy. A public well-known dataset, Malignant pleural mesothelioma and lung adenocarcinoma gene expression database, was used in this study. Prior knowledge is viewed here as a means of directing the classifier using known lung adenocarcinoma related genes. The procedures were performed by software R 2.80. Results The modified method performed better after incorporating prior knowledge. Accuracy of the modified method improved from 98.86% to 100% in training set and from 98.51% to 99.06% in test set. The standard deviations of the modified method decreased from 0.26% to 0 in training set and from 3.04% to 2.10% in test set. Conclusion The method that incorporates prior knowledge into discriminant analysis could effectively improve the capacity and reduce the impact of noise. This idea may have good future not only in practice but also in methodology.

  1. 77 FR 31443 - Energy Conservation Program: Test Procedures for Residential Dishwashers, Dehumidifiers, and...

    Science.gov (United States)

    2012-05-25

    ... an ion exchange to remove calcium and magnesium ions from the water, by swapping sodium ions bonded... addresses energy and water use associated with dishwasher water softeners, the energy test cycle for... dehumidifier test procedure, eliminate measurement of gas pilot light energy use in the cooking products test...

  2. Hanford spent nuclear fuel cold vacuum drying proof of performance test procedure

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1998-01-01

    This document provides the test procedure for cold testing of the first article skids for the Cold Vacuum Drying (CVD) process at the Facility. The primary objective of this testing is to confirm design choices and provide data for the initial start-up parameters for the process. The current scope of testing in this document includes design verification, drying cycle determination equipment performance testing of the CVD process and MCC components, heat up and cool-down cycle determination, and thermal model validation

  3. Postoperative effects of neuromuscular exercise prior to hip or knee arthroplasty

    DEFF Research Database (Denmark)

    Villadsen, Allan; Overgaard, Søren; Holsgaard-Larsen, Anders

    2014-01-01

    neuromuscular exercise prior to total joint arthroplasty (TJA) of the hip or knee did not confer additional benefits 3 months postoperatively compared with TJA alone. However, the intervention group experienced a statistically significant short-term benefit in ADL and pain, suggesting an earlier onset......OBJECTIVE: To investigate the postoperative efficacy of a supervised programme of neuromuscular exercise prior to hip or knee arthroplasty. METHODS: In this assessor-blinded randomised controlled trial, we included 165 patients scheduled for hip or knee arthroplasty due to severe osteoarthritis (OA......). An 8-week preoperative neuromuscular supervised exercise programme was delivered twice a week for 1 h as adjunct treatment to the standard arthroplasty procedure and compared with the standard arthroplasty procedure alone. The primary outcome was self-reported physical function measured...

  4. Vaspar broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria.

    OpenAIRE

    West, S E; Wilkins, T D

    1980-01-01

    A modification of the Wilkins-Thiel broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria is described. This method utilizes an aerobically prepared medium overlaid with molten vaspar. Specialized anaerobic techniques or prereduced media are not required.

  5. Use of a National Continuing Medical Education Meeting to Provide Simulation-Based Training in Temporary Hemodialysis Catheter Insertion Skills: A Pre-Test Post-Test Study

    Directory of Open Access Journals (Sweden)

    Edward G Clark

    2014-10-01

    Full Text Available Background: Simulation-based-mastery-learning (SBML is an effective method to train nephrology fellows to competently insert temporary, non-tunneled hemodialysis catheters (NTHCs. Previous studies of SBML for NTHC-insertion have been conducted at a local level. Objectives: Determine if SBML for NTHC-insertion can be effective when provided at a national continuing medical education (CME meeting. Describe the correlation of demographic factors, prior experience with NTHC-insertion and procedural self-confidence with simulated performance of the procedure. Design: Pre-test – post-test study. Setting: 2014 Canadian Society of Nephrology annual meeting. Participants: Nephrology fellows, internal medicine residents and medical students. Measurements: Participants were surveyed regarding demographics, prior NTHC-insertion experience, procedural self-confidence and attitudes regarding the training they received. NTHC-insertion skills were assessed using a 28-item checklist. Methods: Participants underwent a pre-test of their NTHC-insertion skills at the internal jugular site using a realistic patient simulator and ultrasound machine. Participants then had a training session that included a didactic presentation and 2 hours of deliberate practice using the simulator. On the following day, trainees completed a post-test of their NTHC-insertion skills. All participants were required to meet or exceed a minimum passing score (MPS previously set at 79%. Trainees who did not reach the MPS were required to perform more deliberate practice until the MPS was achieved. Results: Twenty-two individuals participated in SBML training. None met or exceeded the MPS at baseline with a median checklist score of 20 (IQR, 7.25 to 21. Seventeen of 22 participants (77% completed post-testing and improved their scores to a median of 27 (IQR, 26 to 28; p < 0.001. All met or exceeded the MPS on their first attempt. There were no significant correlations between demographics

  6. Use of a national continuing medical education meeting to provide simulation-based training in temporary hemodialysis catheter insertion skills: a pre-test post-test study.

    Science.gov (United States)

    Clark, Edward G; Paparello, James J; Wayne, Diane B; Edwards, Cedric; Hoar, Stephanie; McQuillan, Rory; Schachter, Michael E; Barsuk, Jeffrey H

    2014-01-01

    Simulation-based-mastery-learning (SBML) is an effective method to train nephrology fellows to competently insert temporary, non-tunneled hemodialysis catheters (NTHCs). Previous studies of SBML for NTHC-insertion have been conducted at a local level. Determine if SBML for NTHC-insertion can be effective when provided at a national continuing medical education (CME) meeting. Describe the correlation of demographic factors, prior experience with NTHC-insertion and procedural self-confidence with simulated performance of the procedure. Pre-test - post-test study. 2014 Canadian Society of Nephrology annual meeting. Nephrology fellows, internal medicine residents and medical students. Participants were surveyed regarding demographics, prior NTHC-insertion experience, procedural self-confidence and attitudes regarding the training they received. NTHC-insertion skills were assessed using a 28-item checklist. Participants underwent a pre-test of their NTHC-insertion skills at the internal jugular site using a realistic patient simulator and ultrasound machine. Participants then had a training session that included a didactic presentation and 2 hours of deliberate practice using the simulator. On the following day, trainees completed a post-test of their NTHC-insertion skills. All participants were required to meet or exceed a minimum passing score (MPS) previously set at 79%. Trainees who did not reach the MPS were required to perform more deliberate practice until the MPS was achieved. Twenty-two individuals participated in SBML training. None met or exceeded the MPS at baseline with a median checklist score of 20 (IQR, 7.25 to 21). Seventeen of 22 participants (77%) completed post-testing and improved their scores to a median of 27 (IQR, 26 to 28; p < 0.001). All met or exceeded the MPS on their first attempt. There were no significant correlations between demographics, prior experience or procedural self-confidence with pre-test performance. Small sample-size and

  7. Testing the applicability of the SASS5 scoring procedure for ...

    African Journals Online (AJOL)

    A study was undertaken between 29th January and 17th February 2004 to test the applicability of the South African Scoring System Version 5 (SASS5) scoring and calculation procedure in nutrient-enriched palustrine wetlands in the midlands of KwaZulu-Natal, South Africa. Four reference wetlands and three dairy-effluent ...

  8. Test procedures and instructions for Hanford complexant concentrate supernatant cesium removal using CST

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W.

    1997-01-08

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Complexant Concentrate supernatant liquor from tank 241-AN-107, in a bench-scale column. The cesium sorbent to be tested is crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-023, Hanford Complexant Concentrate Supernatant Cesium Removal Test Plan.

  9. A general Bayes weibull inference model for accelerated life testing

    International Nuclear Information System (INIS)

    Dorp, J. Rene van; Mazzuchi, Thomas A.

    2005-01-01

    This article presents the development of a general Bayes inference model for accelerated life testing. The failure times at a constant stress level are assumed to belong to a Weibull distribution, but the specification of strict adherence to a parametric time-transformation function is not required. Rather, prior information is used to indirectly define a multivariate prior distribution for the scale parameters at the various stress levels and the common shape parameter. Using the approach, Bayes point estimates as well as probability statements for use-stress (and accelerated) life parameters may be inferred from a host of testing scenarios. The inference procedure accommodates both the interval data sampling strategy and type I censored sampling strategy for the collection of ALT test data. The inference procedure uses the well-known MCMC (Markov Chain Monte Carlo) methods to derive posterior approximations. The approach is illustrated with an example

  10. Set-up and Test Procedure for Suction Installation and Uninstallation of Bucket Foundation

    DEFF Research Database (Denmark)

    Koteras, Aleksandra Katarzyna

    This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use of......) and loading frame used for those tests have been already used for axially static and cyclic loading of piles (Thomassen, 2015a) and for axially static and cyclic loading of bucket foundation (Vaitkunaite et al., 2015).......This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use...... of suction under the bucket lid or by applying additional force through the hydraulic piston, forcing the bucket to penetrate into the soil. Tests for uninstallation are performed also with the use of water pressure, as a reverse process to the suction installation. Both installation and uninstallation tests...

  11. A Comparison of Procedures for Content-Sensitive Item Selection in Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1991-01-01

    This simulation investigated two procedures that reduce differences between paper-and-pencil testing and computerized adaptive testing (CAT) by making CAT content sensitive. Results indicate that the price in terms of additional test items of using constrained CAT for content balancing is much smaller than that of using testlets. (SLD)

  12. 75 FR 14287 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-03-24

    ... uses the same measurement techniques as the existing test procedure. In any rulemaking to amend a test...; and (3) appearing on page 29 of the transcript. \\6\\ Ballast type refers to a grouping of ballasts that... grouping of lamps that have the same length, lumen package, base type, and diameter. In the ongoing...

  13. 76 FR 65631 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2011-10-24

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... residential microwave ovens. DOE specifically is seeking information, data, and comments regarding representative and repeatable methods for measuring the energy use of microwave-only ovens and combination...

  14. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  15. SFC/SFBMN guidelines update for nuclear cardiology procedures: stress testing in adults and children

    International Nuclear Information System (INIS)

    Manrique, A.; Marie, P.Y.; Maunoury, Ch.; Acar, Ph.; Agostini, D.

    2002-01-01

    The guidelines update for nuclear cardiology procedures are studied in this article. We find the minimum technique conditions for the stress testing practice, the recommendations for the different ischemia activation tests, the choice of the stress test. (N.C.)

  16. 75 FR 5722 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-04

    ... personal identifying information about an employee (other than a social security number (SSN) or other... testing required under this part. (c) As a drug testing laboratory located in Canada or Mexico which is... procedures. (d) As an IITF located in Canada or Mexico which is not certified by HHS under the NLCP, you are...

  17. 75 FR 42579 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens; Repeal of...

    Science.gov (United States)

    2010-07-22

    ... provided in paragraph (i)(2) of this section, for each basic model of conventional cooking tops, and... the cooking efficiency test procedure for microwave ovens under the Energy Policy and Conservation Act (EPCA). DOE has determined that the microwave oven test procedure to measure the cooking efficiency does...

  18. Facilitating enrollment in a Cancer Registry through modified consent procedures: a pilot study.

    Science.gov (United States)

    Mazanec, Susan; Daly, Barbara; Meropol, Neal J; Step, Mary

    2012-12-01

    Research registries are increasingly important in medical research and are essential to the mission of cancer centers. However, designing enrollment and data collection procedures that are consistent with ethical norms and regulatory requirements yet are efficient and cost effective is a major challenge. Current standard consent forms can be a barrier to enrollment because of their length, multiple components, and technical language. We pilot tested an IRB-approved registry booklet and simplified one-page, tiered consent form, allowing for choice of extent of participation. The booklet was mailed to patients with breast cancer as part of their routine information packet prior to the first clinic appointment. A research nurse met with 27 patients at initial treatment to review the booklet, answer questions, obtain informed consent, and collect quality of life data. The consent rate was 78% with 21 patients enrolling in the study. Twelve of the 21 patients (57%) did not read the booklet prior to the visit. The 9 patients (43%) who had read the booklet prior to arrival found it easy to understand. The multi-stage, simplified consent process and data collection were acceptable to these patients and readily integrated into clinical operations. An easy-to-read registry booklet may be an effective guide for discussion, but in-person consent procedures and further testing of the approach are required.

  19. Initial land reclamation procedures related to possible Pu-cleanup activities at the Tonopah Test Range

    International Nuclear Information System (INIS)

    Wallace, A.; Romney, E.M.

    1976-02-01

    If areas of the Tonopah Test Range (TTR) are to be used for experimental tests of procedures for clean-up of 239 Pu contamination, there are experiences in the Great Basin Desert portions of the Nevada Test Site (NTS) which can serve as guides to reclamation and revegetation of such arid lands. Procedures which will encourage development of the grasses Hilaria jamesii and Oryzopsis hymenoides, as well as the perennial shrubs Eurotia lanata and Atriplex canescens would greatly improve the area as range land

  20. Circular of 24 August 1976 on the organisation of the prior enquiry procedure for official recognition of conventional thermal power plants and nuclear power plants as being in the public interest

    International Nuclear Information System (INIS)

    1976-01-01

    The Minister of Industry and Research published a Circular dated 24th August 1976 on the organisation of the prior enquiry procedure for official recognition of conventional thermal power plants and nuclear power plants as being in the public interest. Publication of this Circular meets the emerging requirement to submit the siting of nuclear installations to a procedure of consultation and communication of detailed information at the central, as well as at the level of the regional authorities. It supplements, in respect of nuclear installations, the provisions organising the conduct of the public enquiry in the Decree of 6th June 1959, amended by a Decree of 14th May 1976. During the stage prior to the enquiry proper, the application for official recognition of a project as being in the public interest must contain the following: a document on the architectural aspect of the planned installation, an environmental impact study, the main provisions on nuclear safety and radiation protection. This Circular repeals and supersedes the Ministerial Circular of 29th October 1959. (N.E.A.) [fr

  1. Development of a Laboratory Test Procedure to Evaluate Tack Coat Performance

    OpenAIRE

    YILDIRIM, Yetkin; SMIT, André de Fortier; KORKMAZ, Armagan

    2014-01-01

    A laboratory testing procedure is presented, the results of which may be used for determining the best combination of tack coat type, mixture type, and application rate to be applied in the field for optimum performance. Tack coat related performance results were determined from Hamburg wheel tracking and simple shear tests on laboratory prepared specimens. This study was undertaken to evaluate the shear strength performance of tack coats under laboratory-controlled conditions. The ...

  2. 9 CFR 147.30 - Laboratory procedure recommended for the polymerase chain reaction (PCR) test for Mycoplasma...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Laboratory procedure recommended for... Examination Procedures § 147.30 Laboratory procedure recommended for the polymerase chain reaction (PCR) test... tracheal swabs in PBS or 1 mL of broth culture by a non-phenolic procedure. Centrifuge samples at 14,000 x...

  3. Grate Pallet 8232 (GP-8232) Vehicle Pallet, Evaluation Tests MIL-STD-1660, "Design Criteria for Ammunition Unit Loads" and TP-94-01 (REV 1), "Transportability Testing Procedures"

    National Research Council Canada - National Science Library

    Barickman, Philip

    2003-01-01

    .... The testing was conducted for informational purposes only. The GP-8232 Vehicle Pallet was evaluated by the testing procedures set forth in MIL-STD-1660 and TP-94-01 (Rev. 1) testing procedures...

  4. Test procedures to detect a loss of material in a sequence of balance periods

    International Nuclear Information System (INIS)

    Avenhaus, R.; Beedgen, R.; Sellinschegg, D.

    1985-06-01

    A workshop on Near-Real-Time Accountancy (NRTA) was held in KfK which came to a preliminary end in December 1982. In the framework of this workshop a number of sequential statistical test procedures were proposed which can be used in the case of a NRTA based safeguards regime. In the report the most promising test procedures are investigated. The analysis is based on the chemical separation process of a large model reprocessing facility with a throughput or 1000 tonnes per year. (orig.) [de

  5. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  6. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  7. 78 FR 15807 - Energy Conservation Program: Test Procedures for Television Sets

    Science.gov (United States)

    2013-03-12

    ... displaying dynamic visual content from wired or wireless sources including but not limited to: * * *''. DOE...) standard ``CEA-2037-A, Determination of Television Average Power Consumption'' into the SNOPR. In today's SNOPR, DOE proposes to update the input power requirements in the TVs test procedure NOPR by referencing...

  8. 40 CFR 205.54-1 - Low speed sound emission test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Low speed sound emission test procedures. 205.54-1 Section 205.54-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205...

  9. Test-Induced Priming Impairs Source Monitoring Accuracy in the DRM Procedure

    OpenAIRE

    Dewhurst, S.; Knott, L.; Howe, M. L.

    2011-01-01

    Three experiments investigated the effects of test-induced priming (TIP) on false recognition in the Deese/Roediger-McDermott procedure. In Experiment 1, TIP significantly increased false recognition for participants who made old/new decisions at test but not for participants who made remember/know judgements or were given diagnostic information to help them avoid false recognition. In Experiment 2, a TIP effect was observed with old/new recognition but not when participants were required to ...

  10. The emotional impact of genetic testing and aspects of counseling prior to prescription of oral contraceptives.

    Science.gov (United States)

    Gartner, Verena; Weber, Michael; Eichinger, Sabine

    2008-11-01

    Oral contraceptives increase the thrombotic risk in women with factor V Leiden. Emotional aspects of genetic testing prior to the prescription of oral contraceptives (OC), aspects of counseling and referral patterns are widely unknown. Two hundred forty-seven women with and 132 women without factor V Leiden were interviewed by questionnaire. One hundred sixty-one women (65%) with factor V Leiden and 63 (48%) with wild-type factor V responded. One hundred seventy-one women (76%) reported being emotionally disturbed by genetic testing. Eighty percent of women with factor V Leiden and 16% of women with wild-type factor V were discouraged from OC use. Three percent of women with factor V Leiden were encouraged to take OC. Forty-one percent of women with factor V Leiden used at least one hormone contraceptive method after diagnosis. Only 46 women (29%) with factor V Leiden were counseled about the relevance of the mutation in case of pregnancy. Testing for factor V Leiden has considerable emotional impact. Recommendations after testing are not consistently driven by the test result.

  11. Sets of priors reflecting prior-data conflict and agreement

    NARCIS (Netherlands)

    Walter, G.M.; Coolen, F.P.A.; Carvalho, J.P.; Lesot, M.-J.; Kaymak, U.; Vieira, S.; Bouchon-Meunier, B.; Yager, R.R.

    2016-01-01

    Bayesian inference enables combination of observations with prior knowledge in the reasoning process. The choice of a particular prior distribution to represent the available prior knowledge is, however, often debatable, especially when prior knowledge is limited or data are scarce, as then

  12. Standard test method for compressive (crushing) strength of fired whiteware materials

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2006-01-01

    1.1 This test method covers two test procedures (A and B) for the determination of the compressive strength of fired whiteware materials. 1.2 Procedure A is generally applicable to whiteware products of low- to moderately high-strength levels (up to 150 000 psi or 1030 MPa). 1.3 Procedure B is specifically devised for testing of high-strength ceramics (over 100 000 psi or 690 MPa). 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  13. Cryopreservation of human colorectal carcinomas prior to xenografting

    International Nuclear Information System (INIS)

    Linnebacher, Michael; Maletzki, Claudia; Ostwald, Christiane; Klier, Ulrike; Krohn, Mathias; Klar, Ernst; Prall, Friedrich

    2010-01-01

    Molecular heterogeneity of colorectal carcinoma (CRC) is well recognized, forming the rationale for molecular tests required before administration of some of the novel targeted therapies that now are rapidly entering the clinics. For clinical research at least, but possibly even for future individualized tumor treatment on a routine basis, propagation of patients' CRC tissue may be highly desirable for detailed molecular, biochemical or functional analyses. However, complex logistics requiring close liaison between surgery, pathology, laboratory researchers and animal care facilities are a major drawback in this. We here describe and evaluate a very simple cryopreservation procedure for colorectal carcinoma tissue prior to xenografting that will considerably reduce this logistic complexity. Fourty-eight CRC collected ad hoc were xenografted subcutaneously into immunodeficient mice either fresh from surgery (N = 23) or after cryopreservation (N = 31; up to 643 days). Take rates after cryopreservation were satisfactory (71%) though somewhat lower than with tumor tissues fresh from surgery (74%), but this difference was not statistically significant. Re-transplantation of cryopreserved established xenografts (N = 11) was always successful. Of note, in this series, all of the major molecular types of CRC were xenografted successfully, even after cryopreservation. Our procedure facilitates collection, long-time storage and propagation of clinical CRC specimens (even from different centres) for (pre)clinical studies of novel therapies or for basic research

  14. Safety panel and new procedures evaluation by simulator tests

    International Nuclear Information System (INIS)

    Meslin, T.

    1986-01-01

    With more than thirty weeks of simulator testing (for the last three years only) and approximately three hundred scenarios, EDF's experience in this field is extensive. This practice is well known within Fossil and Nuclear Generation and is well accepted by the operating teams which participate in it. Simulator testing appears to be an essential decision-making tool in the process of developing new operating aids in PWR plants. Accelerated development and the elimination of long and expensive modifications after commissioning is an economic advantage. The saving in time is obvious, since modifications are carried out continuously throughout the development phase. Finally, operators participate in the development of systems and receive fixed, well-defined applications. This practice has become systematic, and all new applications concerning the operation of PWR plants are simulator-tested, particularly 1300-MW unit computers and operating procedures, the new generation of 900-MW unit computers, and the new 1500-MW fully computerized control rooms. Finally, this simulator testing allows us to considerably increase our knowledge concerning the behavior of operators in accident situations, and special tests are performed for this purpose

  15. Use of urodynamics prior to surgery for urinary incontinence: How helpful is preoperative testing?

    Directory of Open Access Journals (Sweden)

    Gary E Lemack

    2007-01-01

    Full Text Available It has not yet been definitively demonstrated that preoperative evaluation of women with stress urinary incontinence with urodynamic testing enhances presurgical counseling, more effectively models patients′ expectations or improves postoperative outcome. Nonetheless, urodynamic testing is frequently utilized in the assessment of women with stress urinary incontinence and clearly accomplishes a number of goals when utilized for this purpose. For example, there are data to suggest that the risk of voiding dysfunction can be mitigated by utilizing data obtained from urodynamic testing to identify women more likely to void ineffectively after conventional stress incontinence procedures. Furthermore, it has been suggested though not proven, that patients with more severe forms of stress incontinence as identified by urodynamic testing, might be less likely to improve after surgery compared to others with more modest degrees of incontinence. Since urodynamic testing is invasive, costly and not always available, it is imperative that the usefulness of such testing be carefully explored and its utility appropriately defined. In this review, we discuss urodynamic techniques to assess stress urinary incontinence, particularly focusing on the ability of leak point pressure testing and urethral pressure profilometry to predict which patients would most likely benefit from surgery and which might be more likely to experience adverse events following surgery.

  16. Evaluation of a fecal immunochemistry test prior to colonoscopy for outpatients with various indications.

    Science.gov (United States)

    Szilagyi, Andrew; Xue, Xiaoqing

    2017-01-01

    Stool tests can predict advanced neoplasms prior to colonoscopy. Results of immunochemical stool tests to predict findings at colonoscopy for various indications are less often reported. We compared pre-colonoscopy stool tests with findings in patients undergoing colonoscopy for different indications. Charts of patients undergoing elective or semi-urgent colonoscopy were reviewed. Comparison of adenoma detection rates and pathological findings was made between prescreened and non-prescreened, and between stool-positive and stool-negative cases. Demographics, quality of colonoscopy, and pathological findings were recorded. Odds ratios (ORs) and 95% confidence intervals (CIs) were assessed. Statistical significance was accepted at p ≤0.05. Charts of 325 patients were reviewed. Among them, stool tests were done on 144 patients: 114 were negative and 30 were positive. Findings were similar in the pretest and non-pretest groups. Detection of advanced adenomas per patient was higher in the stool-positive group compared to the stool-negative group (23.4% vs 3.5%, p =0.0016, OR =7.6 [95% CI: 2-29.3]). Five advanced adenomas (without high-grade dysplasia or adenocarcinoma) and several cases of multiple adenomas were missed in the negative group. Sensitivity and specificity for advanced polyps was 63.6% and 82.7%, respectively. The negative predictive value was 96.5%. Male gender was independently predictive of any adenoma. The stool immunochemical test best predicted advanced neoplasms and had a high negative predictive value in this small cohort. Whether this test can be applied to determine the need for colonoscopy in groups other than average risk would require more studies.

  17. 49 CFR 572.75 - Lumbar spine, abdomen, and pelvis assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...) ANTHROPOMORPHIC TEST DEVICES 6-Year-Old Child § 572.75 Lumbar spine, abdomen, and pelvis assembly and test procedure. (a) Lumbar spine, abdomen, and pelvis assembly. The lumbar spine, abdomen, and pelvis consist of... 49 Transportation 7 2010-10-01 2010-10-01 false Lumbar spine, abdomen, and pelvis assembly and...

  18. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  19. 75 FR 26183 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-05-11

    ... 2105-AE01 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of...: For program issues, Bohdan Baczara, Office of Drug and Alcohol Policy and Compliance, 1200 New Jersey... of Federal Regulations, as follows: [[Page 26184

  20. Testing of the MFTF magnets

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chang, Y.; Dalder, E.N.C.

    1982-01-01

    This paper describes the cooldown and testing of the first yin-yang magnet for the Mirror Fusion Test Facility. The introduction describes the superconducting magnet; the rest of the paper explains the tests prior to and including magnet cooldown and final acceptance testing. The MFTF (originally MX) was proposed in 1976 and the project was funded for construction start in October 1977. Construction of the first large superconducting magnet set was completed in May 1981 and testing started shortly thereafter. The acceptance test procedures were reviewed in May 1981 and the cooldown and final acceptance test were done by the end of February 1982. During this acceptance testing the magnet achieved its full design current and field

  1. Role of strategies and prior exposure in mental rotation.

    Science.gov (United States)

    Cherney, Isabelle D; Neff, Nicole L

    2004-06-01

    The purpose of these two studies was to examine sex differences in strategy use and the effect of prior exposure on the performance on Vandenberg and Kuse's 1978 Mental Rotation Test. A total of 152 participants completed the spatial task and self-reported their strategy use. Consistent with previous studies, men outperformed women. Strategy usage did not account for these differences, although guessing did. Previous exposure to the Mental Rotation Test, American College Test scores and frequent computer or video game play predicted performance on the test. These results suggest that prior exposure to spatial tasks may provide cues to improve participants' performance.

  2. Use of the oral sugar test in ponies when performed with or without prior fasting.

    Science.gov (United States)

    Knowles, E J; Harris, P A; Elliott, J; Menzies-Gow, N J

    2017-07-01

    It is recommended that the oral sugar test (OST) for insulin dysregulation (ID) be performed after an overnight fast, but fasting is impractical in ponies kept solely at pasture. There are few data on OST repeatability and reliability in ponies. To report 1) whether OST results obtained in the morning after an overnight fast or without fasting in the afternoon (FASTING/FED) can be used interchangeably, 2) time of highest insulin concentration T max [insulin], repeatability and reliability of insulin response to the OST when FASTING or FED and 3) dichotomous agreement (ID/normal) within a small sample when FASTING or FED. Method comparison study. Oral sugar tests were performed on four occasions in 10 adult native British ponies, twice FASTING and twice FED. Insulin concentrations were measured by radioimmunoassay at 0-120 min (T 0,30,60,75,90,120 ). Differences between FASTING and FED results were assessed using mixed effects models. Indices of repeatability and reliability were calculated; dichotomous agreement was reported using kappa statistics. Serum [insulin] was significantly (P≤0.05) higher at T 60 -T 90 with prior fasting (estimated differences [95% confidence intervals]): T 60 : 23.5 μiu/ml (8.7-38.4 μiu/ml), T 75 : 27.1 μiu/ml (12.3-41.8 μiu/ml), T 90 : 15.1 (0.36-29.9 μiu/ml). Most frequently, T max [ins] occurred at T 30 . At any single time point, within-subject coefficients of variation were: FASTING: 40% and FED: 31%. The 95% limits for repeatability were FASTING: 29-340%, FED: 41-240%. Test reliabilities were FASTING: 0.70 and FED: 0.67. For dichotomous interpretation similar results (kappa = 0.7) were obtained using cut-offs of [Insulin] >60 μiu/ml at T 60 or T 90 for FASTING and [Insulin] >51 μiu/ml at T 30 or T 60 for FED samples. Oral sugar tests were performed on a small number of animals on one pasture during one season (spring). Clinicians should beware of interpreting changes in absolute OST results owing to poor repeatability. When

  3. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  4. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  5. Powertrain Test Procedure Development for EPA GHG Certification of Medium- and Heavy-Duty Engines and Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Chambon, Paul H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deter, Dean D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-07-01

    xiii ABSTRACT The goal of this project is to develop and evaluate powertrain test procedures that can accurately simulate real-world operating conditions, and to determine greenhouse gas (GHG) emissions of advanced medium- and heavy-duty engine and vehicle technologies. ORNL used their Vehicle System Integration Laboratory to evaluate test procedures on a stand-alone engine as well as two powertrains. Those components where subjected to various drive cycles and vehicle conditions to evaluate the validity of the results over a broad range of test conditions. Overall, more than 1000 tests were performed. The data are compiled and analyzed in this report.

  6. Total Variability Modeling using Source-specific Priors

    DEFF Research Database (Denmark)

    Shepstone, Sven Ewan; Lee, Kong Aik; Li, Haizhou

    2016-01-01

    sequence of an utterance. In both cases the prior for the latent variable is assumed to be non-informative, since for homogeneous datasets there is no gain in generality in using an informative prior. This work shows in the heterogeneous case, that using informative priors for com- puting the posterior......, can lead to favorable results. We focus on modeling the priors using minimum divergence criterion or fac- tor analysis techniques. Tests on the NIST 2008 and 2010 Speaker Recognition Evaluation (SRE) dataset show that our proposed method beats four baselines: For i-vector extraction using an already...... trained matrix, for the short2-short3 task in SRE’08, five out of eight female and four out of eight male common conditions, were improved. For the core-extended task in SRE’10, four out of nine female and six out of nine male common conditions were improved. When incorporating prior information...

  7. Standard test method for measuring pH of soil for use in corrosion testing

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1995-01-01

    1.1 This test method covers a procedure for determining the pH of a soil in corrosion testing. The principle use of the test is to supplement soil resistivity measurements and thereby identify conditions under which the corrosion of metals in soil may be accentuated (see G 57 - 78 (1984)). 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  8. A step-up test procedure to find the minimum effective dose.

    Science.gov (United States)

    Wang, Weizhen; Peng, Jianan

    2015-01-01

    It is of great interest to find the minimum effective dose (MED) in dose-response studies. A sequence of decreasing null hypotheses to find the MED is formulated under the assumption of nondecreasing dose response means. A step-up multiple test procedure that controls the familywise error rate (FWER) is constructed based on the maximum likelihood estimators for the monotone normal means. When the MED is equal to one, the proposed test is uniformly more powerful than Hsu and Berger's test (1999). Also, a simulation study shows a substantial power improvement for the proposed test over four competitors. Three R-codes are provided in Supplemental Materials for this article. Go to the publishers online edition of Journal of Biopharmaceutical Statistics to view the files.

  9. The impact of mouse passaging of Mycobacterium tuberculosis strains prior to virulence testing in the mouse and guinea pig aerosol models.

    Directory of Open Access Journals (Sweden)

    Paul J Converse

    2010-04-01

    Full Text Available It has been hypothesized that the virulence of lab-passaged Mycobacterium tuberculosis and recombinant M. tuberculosis mutants might be reduced due to multiple in vitro passages, and that virulence might be augmented by passage of these strains through mice before quantitative virulence testing in the mouse or guinea pig aerosol models.By testing three M. tuberculosis H37Rv samples, one deletion mutant, and one recent clinical isolate for survival by the quantitative organ CFU counting method in mouse or guinea pig aerosol or intravenous infection models, we could discern no increase in bacterial fitness as a result of passaging of M. tuberculosis strains in mice prior to quantitative virulence testing in two animal models. Surface lipid expression as assessed by neutral red staining and thin-layer chromatography for PDIM analysis also failed to identify virulence correlates.These results indicate that animal passaging of M. tuberculosis strains prior to quantitative virulence testing in mouse or guinea pig models does not enhance or restore potency to strains that may have lost virulence due to in vitro passaging. It is critical to verify virulence of parental strains before genetic manipulations are undertaken and comparisons are made.

  10. 77 FR 26607 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2012-05-04

    ... Conservation Program: Test Procedures for Electric Motors and Small Electric Motors; Final Rules #0;#0;Federal... Procedures for Electric Motors and Small Electric Motors AGENCY: Office of Energy Efficiency and Renewable... electric motors and small electric motors. That supplemental proposal, along with an earlier proposal from...

  11. Prior Elicitation, Assessment and Inference with a Dirichlet Prior

    Directory of Open Access Journals (Sweden)

    Michael Evans

    2017-10-01

    Full Text Available Methods are developed for eliciting a Dirichlet prior based upon stating bounds on the individual probabilities that hold with high prior probability. This approach to selecting a prior is applied to a contingency table problem where it is demonstrated how to assess the prior with respect to the bias it induces as well as how to check for prior-data conflict. It is shown that the assessment of a hypothesis via relative belief can easily take into account what it means for the falsity of the hypothesis to correspond to a difference of practical importance and provide evidence in favor of a hypothesis.

  12. 75 FR 8528 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office... of small entities, for purposes of the Regulatory Flexibility Act. The Department makes these... necessary for the Department to conduct a regulatory evaluation or Regulatory Flexibility Analysis for this...

  13. Considerations for the selection of an applicable energy efficiency test procedure for electric motors in Malaysia: Lessons for other developing countries

    International Nuclear Information System (INIS)

    Yanti, P.A.A.; Mahlia, T.M.I.

    2009-01-01

    Electric motors are a major energy-consuming appliance in the industrial sector. According to a survey, electric motors account for more than 70% of the total growth from 1991 to 2004 in electricity consumption in this sector in Malaysia. To reduce electricity consumption, Malaysia should consider resetting the minimum energy efficiency standards for electric motors sometime in the coming year. The first step towards adopting energy efficiency standards is the creation of a procedure for testing and rating equipment. An energy test procedure is the technical foundation for all energy efficiency standards, energy labels and other related programs. The test conditions in the test procedure must represent the conditions of the country. This paper presents the process for the selection of an energy test procedure for electric motors in Malaysia based on the country's conditions and requirements. The adoption of test procedures for electric motors internationally by several countries is also discussed in this paper. Even though the paper only discusses the test procedure for electric motors in Malaysia, the methods can be directly applied in other countries without major modifications.

  14. A P-value model for theoretical power analysis and its applications in multiple testing procedures

    Directory of Open Access Journals (Sweden)

    Fengqing Zhang

    2016-10-01

    Full Text Available Abstract Background Power analysis is a critical aspect of the design of experiments to detect an effect of a given size. When multiple hypotheses are tested simultaneously, multiplicity adjustments to p-values should be taken into account in power analysis. There are a limited number of studies on power analysis in multiple testing procedures. For some methods, the theoretical analysis is difficult and extensive numerical simulations are often needed, while other methods oversimplify the information under the alternative hypothesis. To this end, this paper aims to develop a new statistical model for power analysis in multiple testing procedures. Methods We propose a step-function-based p-value model under the alternative hypothesis, which is simple enough to perform power analysis without simulations, but not too simple to lose the information from the alternative hypothesis. The first step is to transform distributions of different test statistics (e.g., t, chi-square or F to distributions of corresponding p-values. We then use a step function to approximate each of the p-value’s distributions by matching the mean and variance. Lastly, the step-function-based p-value model can be used for theoretical power analysis. Results The proposed model is applied to problems in multiple testing procedures. We first show how the most powerful critical constants can be chosen using the step-function-based p-value model. Our model is then applied to the field of multiple testing procedures to explain the assumption of monotonicity of the critical constants. Lastly, we apply our model to a behavioral weight loss and maintenance study to select the optimal critical constants. Conclusions The proposed model is easy to implement and preserves the information from the alternative hypothesis.

  15. 7 CFR 1726.252 - Prior approved contract modification related to liability for special and consequential damages.

    Science.gov (United States)

    2010-01-01

    ... consequential damages on account of breach of this contract shall not exceed in total an amount equal to... 7 Agriculture 11 2010-01-01 2010-01-01 false Prior approved contract modification related to... CONSTRUCTION POLICIES AND PROCEDURES Modifications to RUS Standard Contract Forms § 1726.252 Prior approved...

  16. 40 CFR 63.8687 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.8687 Section 63.8687 Protection of Environment ENVIRONMENTAL... What performance tests, design evaluations, and other procedures must I use? (a) You must conduct each... run must last at least 1 hour. (e) You must use the following equations to determine compliance with...

  17. 40 CFR 63.7112 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.7112 Section 63.7112 Protection of Environment ENVIRONMENTAL..., design evaluations, and other procedures must I use? (a) You must conduct each performance test in Table... use wet dust suppression to control PM from PSH operations, a visible mist is sometimes generated by...

  18. Comparison of the radiochemical separation procedures od plutonium applied for its determination in the environmental samples using alpha spectrometry

    International Nuclear Information System (INIS)

    Komosa, A.; Michalik, S.

    2006-01-01

    Alpha spectrometry of the plutonium isotopes can be performed only after the perfect plutonium separation from other components of the matrix. So, till now numerous procedures have been elaborated and tested. The communication presents comparison of the plutonium content determination in soil, bones, eggshells and in the reference materials obtained by alpha spectrometry combined with two different separation procedures. The samples were mineralized in the concentrated HCl or HF prior to plutonium electrodeposition or coprecipitation with NdF 3 . Some other details were also tested in various variants. Quality of the spectra is discussed in terms of all these pre-treatment methods

  19. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  20. 40 CFR 86.163-00 - Spot check correlation procedures for vehicles tested using a simulation of the environmental...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Spot check correlation procedures for... Complete Heavy-Duty Vehicles; Test Procedures § 86.163-00 Spot check correlation procedures for vehicles... running change approval, each model year for any manufacturer undergoing the spot checking procedures of...

  1. 76 FR 25211 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2011-05-04

    ...-government procurement policies that specify high efficiency ballasts. (CA IOUs, No. 19 at p. 2; NRDC, No. 21... luminous efficiency (BLE), which is measured directly using electrical measurements instead of the photometric measurements employed in the test procedure at Appendix Q. The calculation of BLE includes a...

  2. Bureau of radiological health compliance testing procedures for cabinet S-ray systems

    International Nuclear Information System (INIS)

    Miller, E.A.; Sprau, D.

    1976-01-01

    A manual has been developed by the Bureau of Radiological Health of the Food and Drug Administration to establish procedures for the routine field testing of cabinet x-ray systems to determine compliance with the Federal Performance Standard for Cabinet X-Ray Systems, 21 CFR 1020.40. The manual provides specific instructions for testing each model of cabinet x-ray system. Results from the inspection are recorded on a data from which is designed to permit automatic data processing

  3. 49 CFR 40.247 - What procedures does the BAT or STT follow after a screening test result?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false What procedures does the BAT or STT follow after a... What procedures does the BAT or STT follow after a screening test result? (a) If the test result is an alcohol concentration of less than 0.02, as the BAT or STT, you must do the following: (1) Sign and date...

  4. 77 FR 8178 - Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting

    Science.gov (United States)

    2012-02-14

    .... EERE-2010-BT-TP-0038] Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting... methodologies and gather comments on testing residential central air conditioners and heat pumps designed to use... residential central air conditioners and heat pumps that are single phase with rated cooling capacities less...

  5. Evaluation of a fecal immunochemistry test prior to colonoscopy for outpatients with various indications

    Directory of Open Access Journals (Sweden)

    Szilagyi A

    2017-11-01

    Full Text Available Andrew Szilagyi,1 Xiaoqing Xue2 1Division of Gastroenterology, 2Division of Emergency Medicine, Jewish General Hospital, McGill University School of Medicine, Montreal, Quebec, Canada Background: Stool tests can predict advanced neoplasms prior to colonoscopy. Results of immunochemical stool tests to predict findings at colonoscopy for various indications are less often reported. We compared pre-colonoscopy stool tests with findings in patients undergoing colonoscopy for different indications. Patients and methods: Charts of patients undergoing elective or semi-urgent colonoscopy were reviewed. Comparison of adenoma detection rates and pathological findings was made between prescreened and non-prescreened, and between stool-positive and stool-negative cases. Demographics, quality of colonoscopy, and pathological findings were recorded. Odds ratios (ORs and 95% confidence intervals (CIs were assessed. Statistical significance was accepted at p≤0.05.Results: Charts of 325 patients were reviewed. Among them, stool tests were done on 144 patients: 114 were negative and 30 were positive. Findings were similar in the pretest and non-pretest groups. Detection of advanced adenomas per patient was higher in the stool-positive group compared to the stool-negative group (23.4% vs 3.5%, p=0.0016, OR =7.6 [95% CI: 2–29.3]. Five advanced adenomas (without high-grade dysplasia or adenocarcinoma and several cases of multiple adenomas were missed in the negative group. Sensitivity and specificity for advanced polyps was 63.6% and 82.7%, respectively. The negative predictive value was 96.5%. Male gender was independently predictive of any adenoma. Conclusion: The stool immunochemical test best predicted advanced neoplasms and had a high negative predictive value in this small cohort. Whether this test can be applied to determine the need for colonoscopy in groups other than average risk would require more studies. Keywords: fecal, blood, risks, colonoscopy

  6. 75 FR 8524 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD67 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... IFR to mitigate this conflict between the DOT rules and what we view as beneficial State laws by.... It merely eliminated a conflict that would have precluded parties from complying with certain State...

  7. Prior failed ipsilateral percutaneous endovascular intervention in patients with critical limb ischemia predicts poor outcome after lower extremity bypass

    Science.gov (United States)

    Nolan, Brian W.; De Martino, Randall R.; Stone, David H.; Schanzer, Andres; Goodney, Philip P.; Walsh, Daniel W.; Cronenwett, Jack L.

    2017-01-01

    Background Although open surgical bypass remains the standard revascularization strategy for patients with critical limb ischemia (CLI), many centers now perform peripheral endovascular intervention (PVI) as the first-line treatment for these patients. We sought to determine the effect of a prior ipsilateral PVI (iPVI) on the outcome of subsequent lower extremity bypass (LEB) in patients with CLI. Methods A retrospective cohort analysis of all patients undergoing infrainguinal LEB between 2003 and 2009 within hospitals comprising the Vascular Study Group of New England (VSGNE) was performed. Primary study endpoints were major amputation and graft occlusion at 1 year postoperatively. Secondary outcomes included in-hospital major adverse events (MAE), 1-year mortality, and composite 1-year major adverse limb events (MALE). Event rates were determined using life table analyses and comparisons were performed using the log-rank test. Multivariate predictors were determined using a Cox proportional hazards model with multilevel hierarchical adjustment. Results Of 1880 LEBs performed, 32% (n = 603) had a prior infrainguinal revascularization procedure (iPVI, 7%; ipsilateral bypass, 15%; contralateral PVI, 3%; contralateral bypass, 17%). Patients with prior iPVI, compared with those without a prior iPVI, were more likely to be women (32 vs 41%; P = .04), less likely to have tissue loss (52% vs 63%; P = .02), more likely to require arm vein conduit (16% vs 5%; P = .001), and more likely to be on statin (71% vs 54%; P = .01) and beta blocker therapy (92% vs 81%; P = .01) at the time of their bypass procedure. Other demographic factors were similar between these groups. Prior PVI or bypass did not alter 30-day MAE and 1-year mortality after the index bypass. In contrast, 1-year major amputation and 1-year graft occlusion rates were significantly higher in patients who had prior iPVI than those without (31% vs 20%; P = .046 and 28% vs 18%; P = .009), similar to patients who

  8. Miravalles Geothermal Project: Portable Well Flow Test Equipment and Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The well flow test program has been designed to facilitate the gathering of information, with portable test equipment, from various wells with regard to their capability of flow, the quality of steam produced at various back pressures, the composition and quantity of noncondensable gases flashed from the wells and the composition and quantity of solids in the well's liquid streams (brine). The test program includes procedures for obtaining the following basic flow data pertinent to the plant power cycle design: (1) Effluent steam and brine flows, pressures and temperatures; (2) Noncondensable and dissolved gas contents in steam and brine; (3) H{sub s}S content in gases formed; and (4) Solids content and chemical analysis of steam and brine.

  9. Savings for visuomotor adaptation require prior history of error, not prior repetition of successful actions.

    Science.gov (United States)

    Leow, Li-Ann; de Rugy, Aymar; Marinovic, Welber; Riek, Stephan; Carroll, Timothy J

    2016-10-01

    When we move, perturbations to our body or the environment can elicit discrepancies between predicted and actual outcomes. We readily adapt movements to compensate for such discrepancies, and the retention of this learning is evident as savings, or faster readaptation to a previously encountered perturbation. The mechanistic processes contributing to savings, or even the necessary conditions for savings, are not fully understood. One theory suggests that savings requires increased sensitivity to previously experienced errors: when perturbations evoke a sequence of correlated errors, we increase our sensitivity to the errors experienced, which subsequently improves error correction (Herzfeld et al. 2014). An alternative theory suggests that a memory of actions is necessary for savings: when an action becomes associated with successful target acquisition through repetition, that action is more rapidly retrieved at subsequent learning (Huang et al. 2011). In the present study, to better understand the necessary conditions for savings, we tested how savings is affected by prior experience of similar errors and prior repetition of the action required to eliminate errors using a factorial design. Prior experience of errors induced by a visuomotor rotation in the savings block was either prevented at initial learning by gradually removing an oppositely signed perturbation or enforced by abruptly removing the perturbation. Prior repetition of the action required to eliminate errors in the savings block was either deprived or enforced by manipulating target location in preceding trials. The data suggest that prior experience of errors is both necessary and sufficient for savings, whereas prior repetition of a successful action is neither necessary nor sufficient for savings. Copyright © 2016 the American Physiological Society.

  10. Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.B.

    1997-01-07

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

  11. 29 CFR 1928.53 - Protective enclosures for wheel-type agricultural tractors-test procedures and performance...

    Science.gov (United States)

    2010-07-01

    ... accomplished by using a 4,410-lb (2,000-kg) weight acting as a pendulum. The impact face of the weight shall be... the test; and (G) When any cables, props, or blocking shift or break during the test, the test shall... structure may be used to complete the test procedure; and (C) Impact at side. The blocking and restraining...

  12. A test procedure for energetic and performance analysis of cold appliances for the food industry

    International Nuclear Information System (INIS)

    Armani, F; Boscolo, A

    2013-01-01

    In this article we present a novel approach for the characterization of cold appliances and in particular of refrigerators based on the standard vapour compression cycle with a reciprocating on/off compressor. The test procedure is based on a virtual instrument that perform both the stimulus and the data acquisition on the device under test. Acquired data is elaborated to fit a semi-empirical model based on the energetic balances between thermal and electrical sub systems and the heat exchanged with the environment. This approach results in a simple method to calculate useful parameters of the refrigerator, such as energetic performance, cooling effect and limit values of thermal loads. The test procedure requires only a few temperatures and the electric power consumption to be monitored, resulting in a low impact on the refrigerator. Preliminary tests showed a good estimation of parameters and prediction of energy consumption and heat extraction capacity of the refrigerator under test

  13. Operatibility test procedure for the Waste Information and Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the operability test procedure for the WICS. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  14. Comparison of IRT Likelihood Ratio Test and Logistic Regression DIF Detection Procedures

    Science.gov (United States)

    Atar, Burcu; Kamata, Akihito

    2011-01-01

    The Type I error rates and the power of IRT likelihood ratio test and cumulative logit ordinal logistic regression procedures in detecting differential item functioning (DIF) for polytomously scored items were investigated in this Monte Carlo simulation study. For this purpose, 54 simulation conditions (combinations of 3 sample sizes, 2 sample…

  15. 75 FR 13009 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-03-18

    ... DEPARTMENT OF TRANSPORTATION Office of the Secretary 49 CFR Part 40 [Docket DOT-OST-2008-0088] RIN OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs Correction In rule document 2010-3731 beginning on page 8528 in the issue of Thursday, February 25, 2010, make the...

  16. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2012-03-07

    ... dryer usage factor; and (5) replaces the current representative load size calculation in the drying... specifications for the dryer to be used for bone-drying the test cloth; (10) clarifies the procedures for.... 12 at p. 4-5) NEEA expressed concern that the definition of the active washing mode leaves out...

  17. Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection

    Science.gov (United States)

    2008-09-12

    this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented

  18. Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    The purpose of the test was to verify that the AN Tank Farm Encasement Leak Detector components are functionally integrated and operate in accordance with engineering design specifications The Acceptance Test Procedure HNF-4650, SN-268 Encasement Leak Detection ANA-W-LDSTA-335, was conducted between 22 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure, were found to be labeled and identified as written in the procedure

  19. Priming in implicit memory tasks: prior study causes enhanced discriminability, not only bias.

    Science.gov (United States)

    Zeelenberg, René; Wagenmakers, Eric-Jan M; Raaijmakers, Jeroen G W

    2002-03-01

    R. Ratcliff and G. McKoon (1995, 1996, 1997; R. Ratcliff, D. Allbritton, & G. McKoon, 1997) have argued that repetition priming effects are solely due to bias. They showed that prior study of the target resulted in a benefit in a later implicit memory task. However, prior study of a stimulus similar to the target resulted in a cost. The present study, using a 2-alternative forced-choice procedure, investigated the effect of prior study in an unbiased condition: Both alternatives were studied prior to their presentation in an implicit memory task. Contrary to a pure bias interpretation of priming, consistent evidence was obtained in 3 implicit memory tasks (word fragment completion, auditory word identification, and picture identification) that performance was better when both alternatives were studied than when neither alternative was studied. These results show that prior study results in enhanced discriminability, not only bias.

  20. Accuracy of a Classical Test Theory-Based Procedure for Estimating the Reliability of a Multistage Test. Research Report. ETS RR-17-02

    Science.gov (United States)

    Kim, Sooyeon; Livingston, Samuel A.

    2017-01-01

    The purpose of this simulation study was to assess the accuracy of a classical test theory (CTT)-based procedure for estimating the alternate-forms reliability of scores on a multistage test (MST) having 3 stages. We generated item difficulty and discrimination parameters for 10 parallel, nonoverlapping forms of the complete 3-stage test and…

  1. Simulation and analysis of data for enhancing low cycle fatigue test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Sarajaervi, U.; Cronvall, O. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The simulation and analysis of data for enhancing low cycle fatigue test procedures is discussed in this report. The analysed materials are an austenitic stainless piping steel and an austenitic weld material. This project continues the work performed in 2003 and 2004. The fatigue test data treatment application developed within the project in 2004 for the preparation of the fatigue data has been developed further. Also, more fatigue test data has been analysed with the application than in 2004. In addition to this numerical fatigue simulations were performed with FEM code ABAQUS. With the fatigue test data treatment application one can e.g. both calculate cyclically certain relevant characteristic values, e.g. elastic range, and form a set of certain cyclical parameter values needed as a part of ABAQUS analysis input files. The hardening properties of metals were modelled with both isotropic and kinematic hardening models. The further development of the application included trimming of the analysed data, and consequently trimming of resulting hardening parameters. The need for the trimming arose from the fact that the analysed fatigue test data presents some scatter caused by the limited accuracy of the test equipment and the sampling rate. The hardening parameters obtained from the application analysis results were used in the subsequent ABAQUS analyses, and then the fatigue test data were compared with the ABAQUS simulation results. After finding a procedure to trim result data to get smooth curves for cyclic hardening, hardening and softening could be reproduced in ABAQUS analysis with a reasonable accuracy. The modelling of the fatigue induced initiation and growth of cracks was not considered in this study. On the other hand, a considerable part of the fatigue life of nuclear power plant (NPP) piping components is spent in the phase preceding the initiation and growth of cracks. (au)

  2. Simulation and analysis of data for enhancing low cycle fatigue test procedures

    International Nuclear Information System (INIS)

    Sarajaervi, U.; Cronvall, O.

    2006-04-01

    The simulation and analysis of data for enhancing low cycle fatigue test procedures is discussed in this report. The analysed materials are an austenitic stainless piping steel and an austenitic weld material. This project continues the work performed in 2003 and 2004. The fatigue test data treatment application developed within the project in 2004 for the preparation of the fatigue data has been developed further. Also, more fatigue test data has been analysed with the application than in 2004. In addition to this numerical fatigue simulations were performed with FEM code ABAQUS. With the fatigue test data treatment application one can e.g. both calculate cyclically certain relevant characteristic values, e.g. elastic range, and form a set of certain cyclical parameter values needed as a part of ABAQUS analysis input files. The hardening properties of metals were modelled with both isotropic and kinematic hardening models. The further development of the application included trimming of the analysed data, and consequently trimming of resulting hardening parameters. The need for the trimming arose from the fact that the analysed fatigue test data presents some scatter caused by the limited accuracy of the test equipment and the sampling rate. The hardening parameters obtained from the application analysis results were used in the subsequent ABAQUS analyses, and then the fatigue test data were compared with the ABAQUS simulation results. After finding a procedure to trim result data to get smooth curves for cyclic hardening, hardening and softening could be reproduced in ABAQUS analysis with a reasonable accuracy. The modelling of the fatigue induced initiation and growth of cracks was not considered in this study. On the other hand, a considerable part of the fatigue life of nuclear power plant (NPP) piping components is spent in the phase preceding the initiation and growth of cracks. (au)

  3. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  4. Using virtual reality to test the regularity priors used by the human visual system

    Science.gov (United States)

    Palmer, Eric; Kwon, TaeKyu; Pizlo, Zygmunt

    2017-09-01

    Virtual reality applications provide an opportunity to test human vision in well-controlled scenarios that would be difficult to generate in real physical spaces. This paper presents a study intended to evaluate the importance of the regularity priors used by the human visual system. Using a CAVE simulation, subjects viewed virtual objects in a variety of experimental manipulations. In the first experiment, the subject was asked to count the objects in a scene that was viewed either right-side-up or upside-down for 4 seconds. The subject counted more accurately in the right-side-up condition regardless of the presence of binocular disparity or color. In the second experiment, the subject was asked to reconstruct the scene from a different viewpoint. Reconstructions were accurate, but the position and orientation error was twice as high when the scene was rotated by 45°, compared to 22.5°. Similarly to the first experiment, there was little difference between monocular and binocular viewing. In the third experiment, the subject was asked to adjust the position of one object to match the depth extent to the frontal extent among three objects. Performance was best with symmetrical objects and became poorer with asymmetrical objects and poorest with only small circular markers on the floor. Finally, in the fourth experiment, we demonstrated reliable performance in monocular and binocular recovery of 3D shapes of objects standing naturally on the simulated horizontal floor. Based on these results, we conclude that gravity, horizontal ground, and symmetry priors play an important role in veridical perception of scenes.

  5. A single simple procedure for dewaxing, hydration and heat-induced epitope retrieval (HIER for immunohistochemistry in formalin fixed paraffin-embedded tissue

    Directory of Open Access Journals (Sweden)

    I.M.S. Paulsen

    2015-11-01

    Full Text Available Heat-induced epitope retrieval (HIER is widely used for immunohistochemistry on formalin fixed paraffin-embedded tissue and includes temperatures well above the melting point of paraffin. We therefore tested whether traditional xylene-based removal of paraffin is required on sections from paraffin-embedded tissue, when HIER is performed by vigorous boiling in 10 mM Tris/0.5 mM EGTA-buffer (pH=9. Immunohistochemical results using HIER with or without prior dewaxing in xylene were evaluated using 7 primary antibodies targeting proteins located in the cytosol, intracellular vesicles and plasma membrane. No effect of omitting prior dewaxing was observed on staining pattern. Semiquantitative analysis did not show HIER to influence the intensity of labelling consistently. Consequently, quantification of immune labelling intensity using fluorescent secondary antibodies was performed at 5 dilutions of primary antibody with and without prior dewaxing in xylene. No effect of omitting prior dewaxing on signal intensity was detectable indicating similar immunoreactivity in dewaxed and non-dewaxed sections. The intensity of staining the nucleus with the DNA-stain ToPro3 was similarly unaffected by omission of dewaxing in xylene. In conclusion, the HIER procedure described and tested can be used as a single procedure enabling dewaxing, hydration and epitope retrieval for immunohistochemistry in formalin fixed paraffin-embedded tissue.

  6. Testing alarm resolution procedures in a fuel fabrication facility

    International Nuclear Information System (INIS)

    Smith, B.W.; Razvi, J.

    1984-07-01

    Process monitoring data can be used for generating material loss estimates. The intent of using process control data is to enhance nuclear material control and accounting for the timely detection and resolution of discrepancies. The purpose of an alarm resolution system is to distinguish between system errors and an actual loss of nuclear material. A study has been performed to develop and test a site-specific set of alarm resolution procedures. The results of the study are described and include the frequency of alarms, the causes of alarms, the type of resolution, and the modeling of loss estimates. 3 references, 2 figures, 2 tables

  7. Standard testing procedures for optical fiber and unshielded twisted pair at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.L.

    1993-11-01

    This document will establish a working standard for testing optical fiber and unshielded twisted pair cables included in the Lab-wide telecommunications cabling system. The purpose of these standard testing procedures is to deliver to all Sandians a reliable, low-maintenance, state-of-the-art, ubiquitous telecommunications cabling infrastructure capable of satisfying all current and future telecommunication needs.

  8. The Effects of Prior Knowledge Activation on Study Time Allocation and Free Recall: Investigating the Discrepancy Reduction Model

    NARCIS (Netherlands)

    P.P.J.L. Verkoeijen (Peter); R.M.J.P. Rikers (Remy); H.G. Schmidt (Henk)

    2005-01-01

    textabstractIn this study, the authors examined the influence of prior knowledge activation on information processing by means of a prior knowledge activation procedure adopted from the read–generate paradigm. On the basis of cue-target pairs, participants in the experimental groups generated two

  9. Development of a testing methodology for computerized procedure system based on JUnit framework and MFM

    International Nuclear Information System (INIS)

    Qin, Wei

    2004-02-01

    Paper Based Procedure (PBP) and Computerized Procedure System (CPS) are studied to demonstrate that it is necessary to develop CPS in Nuclear Power Plant (NPP) Instrumentation and Control (I and C) system. Computerized procedure system is actually a software system. All the desired and undesired properties of a software system can be described and evaluated as software qualities. Generally, software qualities can be categorized into product quality and process quality. In order to achieve product quality, the process quality of a software system should also be considered and achieved. Characteristics of CPS will be described to analyse the product and process of an example CPS: ImPRO. At the same time, several main product and process issues will be analysed from Verification and Validation (V and V) point of view. It is concluded and suggested that V and V activities can also be regarded as a software development process, this point of view then is applied to the V and V activities of ImPRO as a systematic approach of testing of ImPRO. To support and realize this approach, suitable testing technologies and testing strategies are suggested based on JUnit framework and Multi-level Flow Modeling (MFM)

  10. Preliminary study for the reliability Assurance on results and procedure of the out-pile mechanical characterization test for a fuel assembly; Lateral Vibration Test (I)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kang Hee; Yoon, Kyung Hee; Kim, Hyung Kyu [KAERI, Daejeon (Korea, Republic of)

    2007-07-01

    The reliability assurance with respect to the test procedure and results of the out-pile mechanical performance test for the nuclear fuel assembly is an essential task to assure the test quality and to get a permission for fuel loading into the commercial reactor core. For the case of vibration test, proper management and appropriate calibration of instruments and devices used in the test, various efforts to minimize the possible error during the test and signal acquisition process are needed. Additionally, the deep understanding both of the theoretical assumption and simplification for the signal processing/modal analysis and of the functions of the devices used in the test were highly required. In this study, the overall procedure and result of lateral vibration test were assembly's mechanical characterization were briefly introduced. A series of measures to assure and improve the reliability of the vibration test were discussed.

  11. Preliminary study for the reliability Assurance on results and procedure of the out-pile mechanical characterization test for a fuel assembly; Lateral Vibration Test (I)

    International Nuclear Information System (INIS)

    Lee, Kang Hee; Yoon, Kyung Hee; Kim, Hyung Kyu

    2007-01-01

    The reliability assurance with respect to the test procedure and results of the out-pile mechanical performance test for the nuclear fuel assembly is an essential task to assure the test quality and to get a permission for fuel loading into the commercial reactor core. For the case of vibration test, proper management and appropriate calibration of instruments and devices used in the test, various efforts to minimize the possible error during the test and signal acquisition process are needed. Additionally, the deep understanding both of the theoretical assumption and simplification for the signal processing/modal analysis and of the functions of the devices used in the test were highly required. In this study, the overall procedure and result of lateral vibration test were assembly's mechanical characterization were briefly introduced. A series of measures to assure and improve the reliability of the vibration test were discussed

  12. Procedures for parametric studies of costs of superconducting toroidal test assemblies

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1976-05-01

    A cost scaling procedure, based on a detailed reference conceptual design, has been developed to determine the effects of variations in the characteristic parameters of superconducting toroidal field coils on project costs. The primary purpose was to provide reasonably simple rational formulae for obtaining approximate costs of a complete installation, focusing on the trends and sensitivities of costs to changes in various parameters such as field strength, coil size, number of coils, and current density rather than establishing absolute costs. No results are included here because early studies applying these procedures are no longer pertinent to the present Superconducting Magnet Development Program. However, planning for the Large Coil Project and the preliminary conceptual design of the Technology Test Assembly with Plasma have employed the techniques described and results will be reported in the appropriate project documents

  13. Usability Testing for Developing Effective Interactive Multimedia Software: Concepts, Dimensions, and Procedures

    Directory of Open Access Journals (Sweden)

    Sung Heum Lee

    1999-04-01

    Full Text Available Usability testing is a dynamic process that can be used throughout the process of developing interactive multimedia software. The purpose of usability testing is to find problems and make recommendations to improve the utility of a product during its design and development. For developing effective interactive multimedia software, dimensions of usability testing were classified into the general categories of: learnability; performance effectiveness; flexibility; error tolerance and system integrity; and user satisfaction. In the process of usability testing, evaluation experts consider the nature of users and tasks, tradeoffs supported by the iterative design paradigm, and real world constraints to effectively evaluate and improve interactive multimedia software. Different methods address different purposes and involve a combination of user and usability testing, however, usability practitioners follow the seven general procedures of usability testing for effective multimedia development. As the knowledge about usability testing grows, evaluation experts will be able to choose more effective and efficient methods and techniques that are appropriate to their goals.

  14. Transportability Testing of the Family of Medium Tactical Vehicles (FMTV) 10-Ton Dump Truck, TP-94-01, Rev. 2, June 2004, "Transportability Testing Procedures"

    National Research Council Canada - National Science Library

    Barickman, Philip W

    2007-01-01

    ... (FMTV) 10-ton dump truck manufactured by Stewart and Stevenson Systems, Inc., Sealy, Texas. The testing was conducted in accordance with TP-94-01, Revision 2, June 2004 "Transportability Testing Procedures...

  15. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  16. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  17. A column exchange chromatographic procedure for the automated purification of analytical samples in nuclear spent fuel reprocessing and plutonium fuel fabrication

    International Nuclear Information System (INIS)

    Zahradnik, P.; Swietly, H.; Doubek, N.; Bagliano, G.

    1992-11-01

    A Column Exchange Chromatographic procedure using Tri-n-Octyl-Phosphine-Oxide (TOPO) as stationary phase, is in routine use at SAL since 1984 on nuclear spent fuel reprocessing and on Pu product samples, prior to alpha and mass spectrometric analysis. This standard procedure was further on modified in view of its automation in a glove box; the resulting new procedure is described in this paper. Laboratory Robot Compatible (LRC) disposable columns were selected because their dimensions are particularly favorable and reproducible. A less corrosive HNO 3 -HI mixture substituted the former HC1-HI plutonium eluant. The inorganic support of the stationary phase used to test the above mentioned changes was unexpectedly withdrawn from the market so that another support had to be selected and the procedure reoptimized accordingly. The resulting procedure was tested with the robot and validated against the manual procedure taken as reference: the comparison showed that the modified procedure meets the analytical requirements and has the same performance than the original procedure. (author). Refs, figs and tabs

  18. A statistical procedure for testing financial contagion

    Directory of Open Access Journals (Sweden)

    Attilio Gardini

    2013-05-01

    Full Text Available The aim of the paper is to provide an analysis of contagion through the measurement of the risk premia disequilibria dynamics. In order to discriminate among several disequilibrium situations we propose to test contagion on the basis of a two-step procedure: in the first step we estimate the preference parameters of the consumption-based asset pricing model (CCAPM to control for fundamentals and to measure the equilibrium risk premia in different countries; in the second step we measure the differences among empirical risk premia and equilibrium risk premia in order to test cross-country disequilibrium situations due to contagion. Disequilibrium risk premium measures are modelled by the multivariate DCC-GARCH model including a deterministic crisis variable. The model describes simultaneously the risk premia dynamics due to endogenous amplifications of volatility and to exogenous idiosyncratic shocks (contagion, having controlled for fundamentals effects in the first step. Our approach allows us to achieve two goals: (i to identify the disequilibria generated by irrational behaviours of the agents, which cause increasing in volatility that is not explained by the economic fundamentals but is endogenous to financial markets, and (ii to assess the existence of contagion effect defined by exogenous shift in cross-country return correlations during crisis periods. Our results show evidence of contagion from the United States to United Kingdom, Japan, France, and Italy during the financial crisis which started in 2007-08.

  19. Rio Blanco gas composition: preproduction testing of the RBE-01 wellhead

    International Nuclear Information System (INIS)

    Smith, C.F.; Fontanilla, J.E.

    1976-01-01

    The chemical composition and radionuclide concentration of Rio Blanco gas samples collected prior to the production testing of the RBE-01 well and analyzed at LLL are presented. The analytical procedures and their uncertainties are briefly summarized. Information that associates the analytical data with the field operations is included

  20. The inSIGHT study: costs and effects of routine hysteroscopy prior to a first IVF treatment cycle. A randomised controlled trial.

    Science.gov (United States)

    Smit, Janine G; Kasius, Jenneke C; Eijkemans, Marinus J C; Koks, Carolien A M; Van Golde, Ron; Oosterhuis, Jurjen G E; Nap, Annemiek W; Scheffer, Gabrielle J; Manger, Petra A P; Hoek, Annemiek; Kaplan, Mesrure; Schoot, Dick B C; van Heusden, Arne M; Kuchenbecker, Walter K H; Perquin, Denise A M; Fleischer, Kathrin; Kaaijk, Eugenie M; Sluijmer, Alexander; Friederich, Jaap; Laven, Joop S E; van Hooff, Marcel; Louwe, Leonie A; Kwee, Janet; Boomgaard, Jantien J; de Koning, Corry H; Janssen, Ineke C A H; Mol, Femke; Mol, Ben W J; Torrance, Helen L; Broekmans, Frank J M

    2012-08-08

    In in vitro fertilization (IVF) and intracytoplasmatic sperm injection (ICSI) treatment a large drop is present between embryo transfer and occurrence of pregnancy. The implantation rate per embryo transferred is only 30%. Studies have shown that minor intrauterine abnormalities can be found in 11-45% of infertile women with a normal transvaginal sonography or hysterosalpingography. Two randomised controlled trials have indicated that detection and treatment of these abnormalities by office hysteroscopy after two failed IVF cycles leads to a 9-13% increase in pregnancy rate. Therefore, screening of all infertile women for intracavitary pathology prior to the start of IVF/ICSI is increasingly advocated. In absence of a scientific basis for such a policy, this study will assess the effects and costs of screening for and treatment of unsuspected intrauterine abnormalities by routine office hysteroscopy, with or without saline infusion sonography (SIS), prior to a first IVF/ICSI cycle. Multicenter randomised controlled trial in asymptomatic subfertile women, indicated for a first IVF/ICSI treatment cycle, with normal findings at transvaginal sonography. Women with recurrent miscarriages, prior hysteroscopy treatment and intermenstrual blood loss will not be included. Participants will be randomised for a routine fertility work-up with additional (SIS and) hysteroscopy with on-the-spot-treatment of predefined intrauterine abnormalities versus the regular fertility work-up without additional diagnostic tests. The primary study outcome is the cumulative ongoing pregnancy rate resulting in live birth achieved within 18 months of IVF/ICSI treatment after randomisation. Secondary study outcome parameters are the cumulative implantation rate; cumulative miscarriage rate; patient preference and patient tolerance of a SIS and hysteroscopy procedure. All data will be analysed according to the intention-to-treat principle, using univariate and multivariate logistic regression and

  1. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...

  2. Lymphography prior to laparoscopic Palomo varicocelectomy to prevent postoperative hydrocele.

    Science.gov (United States)

    Chiarenza, Salvatore F; D'Agostino, Sergio; Scarpa, Mariagrazia; Fabbro, Mariangelica; Costa, Lorenzo; Musi, Luciano

    2006-08-01

    We report our experience with preoperative lymphography to identify and perioperatively preserve the ligature of the lymphatic vessels to reduce the incidence of postoperative testicular hydrocele in patients undergoing laparoscopic Palomo varicocelectomy for adolescent varicocele. Twenty-seven consecutive patients with varicocele had preoperative lymphography. The mean age was 13.5 years (range, 8-18 years) and the mean grade of varicocele was III. We performed lymphography with intrascrotal isosulfan blue. The laparoscopic Palomo procedure was successfully carried out in all patients. In 17 patients (63%) we were able to identify and conserve the lymphatic vessels by lymphography. Mean follow-up was 9.5 months (range, 6-24 months). None of the 27 patients had a recurrence. None of the 17 patients with positive lymphography had a testicular hydrocele. One of the 10 remaining patients developed a sizable hydrocele. Preoperative lymphography prior to laparoscopic Palomo varicocelectomy is a simple and feasible method for preventing testicular hydrocele. However, the method should be standardized to identify the exact site, the correct level of injection of blue dye, and to determine the optimal time to perform lymphography prior to the procedure.

  3. Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    The purpose of the test was to verify that the AN Tank Farm B Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4646,241-AN-B-Pit Leak Detection ANB-WT-LDSTA-231 was conducted between 26 June and 02 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as written in the procedure

  4. 40 CFR 63.9915 - What test methods and other procedures must I use to demonstrate initial compliance with dioxin...

    Science.gov (United States)

    2010-07-01

    ... must I use to demonstrate initial compliance with dioxin/furan emission limits? 63.9915 Section 63.9915....9915 What test methods and other procedures must I use to demonstrate initial compliance with dioxin... limit for dioxins/furans in Table 1 to this subpart, you must follow the test methods and procedures...

  5. A combined hands-on teaching programme and clinical pathway focused on pleural ultrasound and procedure supervision transforms pleural procedure outcomes.

    Science.gov (United States)

    Edwards, Timothy; Cook, Alistair; Salamonsen, Matthew; Bashirzadeh, Farzad; Fielding, David

    2017-11-01

    Management of pleural effusions is a common diagnostic and management problem. We reviewed the outcomes from pleural procedures after the instigation of pleural effusion management guidelines, focusing on pleural ultrasound and a hands-on teaching programme followed by procedure supervision that enabled many operators to perform such procedures. This is a retrospective analysis of all procedures performed for pleural effusions on medical patients. Outcomes were assessed prior to the instigation of pleural effusion management guidelines (pleural pathway) and hands-on teaching (January 2010 to June 2011) and following these interventions (January 2012 to June 2013). A total of 171 procedures involving 129 patients (pre-pathway group) and 146 procedures involving 115 patients (post-pathway group) was analysed. The rate of complications prior to the pleural pathway was 22.2% (38 of 171 procedures). Following the pathway, the rate of complications declined to 7.5% (11 of 146 procedures, P < 0.003). The use of pleural ultrasound increased dramatically (72.5 vs 90.2%). The number of patients who underwent repeated procedures (defined as ≥3) reduced dramatically (21 vs 7, P < 0.01). This improvement occurred using many supervised operators who completed the hands-on teaching programme (n = 32) and followed the pleural pathway (127 of 146 procedures). The instigation of a clinical pathway focused on the use of bedside pleural ultrasound, and teaching of drainage techniques with procedure supervision vastly improved patient outcomes. This not only allowed better quality of care for patients, it also provided the acquisition of new skills to medical staff, not limiting these skills to specialised staff. © 2017 Royal Australasian College of Physicians.

  6. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  7. 76 FR 65616 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Central Air...

    Science.gov (United States)

    2011-10-24

    ... pages 2- 3. Both the American Heating and Refrigeration Institute (AHRI) and Trane stated that the... untested split system combinations for SEER and HSPF. \\4\\ ARMs are computer simulations used to rate... procedure, which is detailed in section 0, and comprises whole system testing, not testing or simulation of...

  8. SMELL-S and SMELL-R: Olfactory tests not influenced by odor-specific insensitivity or prior olfactory experience.

    Science.gov (United States)

    Hsieh, Julien W; Keller, Andreas; Wong, Michele; Jiang, Rong-San; Vosshall, Leslie B

    2017-10-24

    Smell dysfunction is a common and underdiagnosed medical condition that can have serious consequences. It is also an early biomarker of neurodegenerative diseases, including Alzheimer's disease, where olfactory deficits precede detectable memory loss. Clinical tests that evaluate the sense of smell face two major challenges. First, human sensitivity to individual odorants varies significantly, so test results may be unreliable in people with low sensitivity to a test odorant but an otherwise normal sense of smell. Second, prior familiarity with odor stimuli can bias smell test performance. We have developed nonsemantic tests for olfactory sensitivity (SMELL-S) and olfactory resolution (SMELL-R) that use mixtures of odorants that have unfamiliar smells. The tests can be self-administered by healthy individuals with minimal training and show high test-retest reliability. Because SMELL-S uses odor mixtures rather than a single molecule, odor-specific insensitivity is averaged out, and the test accurately distinguished people with normal and dysfunctional smell. SMELL-R is a discrimination test in which the difference between two stimulus mixtures can be altered stepwise. This is an advance over current discrimination tests, which ask subjects to discriminate monomolecular odorants whose difference in odor cannot be quantified. SMELL-R showed significantly less bias in scores between North American and Taiwanese subjects than conventional semantically based smell tests that need to be adapted to different languages and cultures. Based on these proof-of-principle results in healthy individuals, we predict that SMELL-S and SMELL-R will be broadly effective in diagnosing smell dysfunction. Published under the PNAS license.

  9. Testability evaluation using prior information of multiple sources

    Directory of Open Access Journals (Sweden)

    Wang Chao

    2014-08-01

    Full Text Available Testability plays an important role in improving the readiness and decreasing the life-cycle cost of equipment. Testability demonstration and evaluation is of significance in measuring such testability indexes as fault detection rate (FDR and fault isolation rate (FIR, which is useful to the producer in mastering the testability level and improving the testability design, and helpful to the consumer in making purchase decisions. Aiming at the problems with a small sample of testability demonstration test data (TDTD such as low evaluation confidence and inaccurate result, a testability evaluation method is proposed based on the prior information of multiple sources and Bayes theory. Firstly, the types of prior information are analyzed. The maximum entropy method is applied to the prior information with the mean and interval estimate forms on the testability index to obtain the parameters of prior probability density function (PDF, and the empirical Bayesian method is used to get the parameters for the prior information with a success-fail form. Then, a parametrical data consistency check method is used to check the compatibility between all the sources of prior information and TDTD. For the prior information to pass the check, the prior credibility is calculated. A mixed prior distribution is formed based on the prior PDFs and the corresponding credibility. The Bayesian posterior distribution model is acquired with the mixed prior distribution and TDTD, based on which the point and interval estimates are calculated. Finally, examples of a flying control system are used to verify the proposed method. The results show that the proposed method is feasible and effective.

  10. Testing taste sensitivity and aversion in very young children : development of a procedure

    NARCIS (Netherlands)

    Visser, J; Kroeze, J.H.A.; Kamps, WA; Bijleveld, CMA

    Taste perception in 45 3- to 6-year-old children was tested using procedures specifically designed for this age group. Detection thresholds for sucrose and urea were measured by a staircase method and aversion to urea was assessed hedonically, using drawings of facial expressions. All children

  11. Construction and test of the PRIOR proton microscope

    International Nuclear Information System (INIS)

    Lang, Philipp-Michael

    2015-01-01

    The study of High Energy Density Matter (HEDM) in the laboratory makes great demands on the diagnostics because these states can usually only be created for a short time and usual diagnostic techniques with visible light or X-rays come to their limit because of the high density. The high energy proton radiography technique that was developed in the 1990s at the Los Alamos National Laboratory is a very promising possibility to overcome those limits so that one can measure the density of HEDM with high spatial and time resolution. For this purpose the proton microscope PRIOR (Proton Radiography for FAIR) was set up at GSI, which not only reproduces the image, but also magnifies it by a factor of 4.2 and thereby penetrates matter with a density up to 20 g/cm 2 . Straightaway a spatial resolution of less than 30 μm and a time resolution on the nanosecond scale was achieved. This work describes details to the principle, design and construction of the proton microscope as well as first measurements and simulations of essential components like magnetic lenses, a collimator and a scintillator screen. For the latter one it was possible to show that plastic scintillators can be used as converter as an alternative to the slower but more radiation resistant crystals, so that it is possible to reach a time resolution of 10 ns. Moreover the characteristics were investigated for the system at the commissioning in April 2014. Also the changes in the magnetic field due to radiation damage were studied. Besides that an overview about future applications is given. First experiments with Warm Dense Matter created by using a Pulsed Power Setup have already been performed. Furthermore the promising concept of combining proton radiography with particle therapy has been investigated in context of the PaNTERA project. An outlook on the possibilities with future experiments at the FAIR accelerator facility is given as well. Because of higher beam intensity an energy one can expect even

  12. 10 CFR 765.21 - Procedures for processing reimbursement claims.

    Science.gov (United States)

    2010-01-01

    ... Department shall complete a final review of all relevant information prior to making a reimbursement decision... 10 Energy 4 2010-01-01 2010-01-01 false Procedures for processing reimbursement claims. 765.21... AND THORIUM PROCESSING SITES Procedures for Submitting and Processing Reimbursement Claims § 765.21...

  13. Triggered by Medication Used in Dental Procedures: A Case Report

    Directory of Open Access Journals (Sweden)

    Aristo Vojdani

    2012-01-01

    Full Text Available Enhanced intestinal permeability and food sensitivity are two of the many proven causes of gastrointestinal disorders. This present report describes a woman with no previous gastrointestinal (GI complaints, who underwent dental root canal, bone graft, and implant procedures. Postsurgery she experienced an allergic reaction to the combined medications. In the weeks that followed, she presented with multiple food intolerances. Four weeks after the final dental procedure, she was assessed serologically for mucosal immune function, salivary, and blood-gluten reactivity, intestinal permeability, and other food sensitivities. Compared to her test reports from two months prior to her first dental procedure, the patient’s results showed high total secretory IgA (SIgA and elevated salivary antibodies to alpha-gliadin, indicating abnormal mucosal immunity and loss of tolerance to gluten. Her serologic assessments revealed immunoglobulin G (IgG and IgA antibodies to a range of wheat/gluten proteins and peptides, gut bacterial endotoxins and tight junction proteins. These test results indicate gut dysbiosis, enhanced intestinal permeability, systemic gluten-reactivity, and immune response to other dietary macromolecules. The present case suggests that patients who experience severe allergic or pseudoallergic reactions to medication should be assessed and monitored for gut dysfunction. If left untreated this could lead to autoimmune reactions to self tissues.

  14. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  15. Pre-procedural fasting for coronary interventions: is it time to change practice?

    Science.gov (United States)

    Hamid, Tahir; Aleem, Qaiser; Lau, Yeecheng; Singh, Ravi; McDonald, John; Macdonald, John E; Sastry, Sanjay; Arya, Sanjay; Bainbridge, Anthony; Mudawi, Telal; Balachandran, Kanarath

    2014-04-01

    Traditionally, patients are kept nil-per-os/nil-by-mouth (NPO/NBM) prior to invasive cardiac procedures, yet there exists neither evidence nor clear guidance about the benefits of this practice. To demonstrate that percutaneous cardiac catheterisation does not require prior fasting. The data source is a retrospective analysis of data registry of consecutive patients who underwent percutaneous coronary intervention (PCI) for acute coronary syndrome (ACS) and stable angina at two district general hospitals in the UK with no on-site cardiac surgery services. A total of 1916 PCI procedures were performed over a 3-year period. None of the patients were kept NPO/NBM prior to their coronary procedures. The mean age was 67±16 years. 1349 (70%) were men; 38.5% (738/1916) had chronic stable angina, while the rest had ACS. 21% (398/1916) were diabetics while 53% (1017/1916) were hypertensive. PCI was technically successful in 95% (1821/1916) patients. 88.5% (1697/1916) had transradial approach. 77% (570/738) of elective PCI patients were discharged within 6 h postprocedure. No patients required emergency endotracheal intubation and there were no occurrences of intraprocedural or postprocedural aspiration pneumonia. Our observational study demonstrates that patients undergoing PCI do not need to be fasted prior to their procedures.

  16. Characterization Test Procedures for Intersection Collision Avoidance Systems Based on Vehicle-to-Vehicle Communications

    Science.gov (United States)

    2015-12-01

    Characterization test procedures have been developed to quantify the performance of intersection collision avoidance (ICA) systems based on vehicle-to-vehicle communications. These systems warn the driver of an imminent crossing-path collision at a r...

  17. Testing declarative memory in laboratory rats and mice using the nonconditioned social discrimination procedure.

    Science.gov (United States)

    Engelmann, Mario; Hädicke, Jana; Noack, Julia

    2011-07-14

    Testing declarative memory in laboratory rodents can provide insights into the fundamental mechanisms underlying this type of learning and memory processing, and these insights are likely to be applicable to humans. Here we provide a detailed description of the social discrimination procedure used to investigate recognition memory in rats and mice, as established during the last 20 years in our laboratory. The test is based on the use of olfactory signals for social communication in rodents; this involves a direct encounter between conspecifics, during which the investigatory behavior of the experimental subject serves as an index for learning and memory performance. The procedure is inexpensive, fast and very reliable, but it requires well-trained human observers. We include recent modifications to the procedure that allow memory extinction to be investigated by retroactive and proactive interference, and that enable the dissociated analysis of the central nervous processing of the volatile fraction of an individual's olfactory signature. Depending on the memory retention interval under study (short-term memory, intermediate-term memory, long-term memory or long-lasting memory), the protocol takes ~10 min or up to several days to complete.

  18. SMELL-S and SMELL-R: Olfactory tests not influenced by odor-specific insensitivity or prior olfactory experience

    Science.gov (United States)

    Jiang, Rong-San

    2017-01-01

    Smell dysfunction is a common and underdiagnosed medical condition that can have serious consequences. It is also an early biomarker of neurodegenerative diseases, including Alzheimer’s disease, where olfactory deficits precede detectable memory loss. Clinical tests that evaluate the sense of smell face two major challenges. First, human sensitivity to individual odorants varies significantly, so test results may be unreliable in people with low sensitivity to a test odorant but an otherwise normal sense of smell. Second, prior familiarity with odor stimuli can bias smell test performance. We have developed nonsemantic tests for olfactory sensitivity (SMELL-S) and olfactory resolution (SMELL-R) that use mixtures of odorants that have unfamiliar smells. The tests can be self-administered by healthy individuals with minimal training and show high test–retest reliability. Because SMELL-S uses odor mixtures rather than a single molecule, odor-specific insensitivity is averaged out, and the test accurately distinguished people with normal and dysfunctional smell. SMELL-R is a discrimination test in which the difference between two stimulus mixtures can be altered stepwise. This is an advance over current discrimination tests, which ask subjects to discriminate monomolecular odorants whose difference in odor cannot be quantified. SMELL-R showed significantly less bias in scores between North American and Taiwanese subjects than conventional semantically based smell tests that need to be adapted to different languages and cultures. Based on these proof-of-principle results in healthy individuals, we predict that SMELL-S and SMELL-R will be broadly effective in diagnosing smell dysfunction. PMID:29073044

  19. Relationships between Loblolly Pine small clear specimens and Dimension Lumber Tested in Static Bending

    Science.gov (United States)

    Mark Alexander Butler; Joseph Dahlen; Finto Antony; Michael Kane; Thomas L. Eberhardt; Huizhe Jin; Kim Love-Myers; John Paul McTague

    2016-01-01

    Prior to the 1980s, the allowable stresses for lumber in North America were derived from testing of small clear specimens. However, the procedures were changed because these models were found to be inaccurate. Nevertheless, small clear testing continues to be used around the world for allowable stress determinations and in studies that examine forest management impacts...

  20. A test procedure for determining the influence of stress ratio on fatigue crack growth

    Science.gov (United States)

    Fitzgerald, J. H.; Wei, R. P.

    1974-01-01

    A test procedure is outlined by which the rate of fatigue crack growth over a range of stress ratios and stress intensities can be determined expeditiously using a small number of specimens. This procedure was developed to avoid or circumvent the effects of load interactions on fatigue crack growth, and was used to develop data on a mill annealed Ti-6Al-4V alloy plate. Experimental data suggest that the rates of fatigue crack growth among the various stress ratios may be correlated in terms of an effective stress intensity range at given values of K max. This procedure is not to be used, however, for determining the corrosion fatigue crack growth characteristics of alloys when nonsteady-state effects are significant.

  1. 14 CFR 1217.105 - Procedures.

    Science.gov (United States)

    2010-01-01

    ... Associated Services Agreement. (d) If articles procured under contract by NASA are imported prior to... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Procedures. 1217.105 Section 1217.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION DUTY-FREE ENTRY OF SPACE ARTICLES § 1217...

  2. Standard Test Method for Sandwich Corrosion Test

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This test method defines the procedure for evaluating the corrosivity of aircraft maintenance chemicals, when present between faying surfaces (sandwich) of aluminum alloys commonly used for aircraft structures. This test method is intended to be used in the qualification and approval of compounds employed in aircraft maintenance operations. 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information. 1.3 This standard may involve hazardous materials, operations, and equipment. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific hazard statements appear in Section 9.

  3. 33 CFR 51.9 - Discharge review procedures.

    Science.gov (United States)

    2010-07-01

    ... GUARD DISCHARGE REVIEW BOARD § 51.9 Discharge review procedures. (a) Preliminary. Prior to a review... that reasonable bounds of relevancy and materiality are adhered to in the taking of evidence. (3) An...

  4. External Prior Guided Internal Prior Learning for Real-World Noisy Image Denoising

    Science.gov (United States)

    Xu, Jun; Zhang, Lei; Zhang, David

    2018-06-01

    Most of existing image denoising methods learn image priors from either external data or the noisy image itself to remove noise. However, priors learned from external data may not be adaptive to the image to be denoised, while priors learned from the given noisy image may not be accurate due to the interference of corrupted noise. Meanwhile, the noise in real-world noisy images is very complex, which is hard to be described by simple distributions such as Gaussian distribution, making real noisy image denoising a very challenging problem. We propose to exploit the information in both external data and the given noisy image, and develop an external prior guided internal prior learning method for real noisy image denoising. We first learn external priors from an independent set of clean natural images. With the aid of learned external priors, we then learn internal priors from the given noisy image to refine the prior model. The external and internal priors are formulated as a set of orthogonal dictionaries to efficiently reconstruct the desired image. Extensive experiments are performed on several real noisy image datasets. The proposed method demonstrates highly competitive denoising performance, outperforming state-of-the-art denoising methods including those designed for real noisy images.

  5. Bayesian Image Segmentations by Potts Prior and Loopy Belief Propagation

    Science.gov (United States)

    Tanaka, Kazuyuki; Kataoka, Shun; Yasuda, Muneki; Waizumi, Yuji; Hsu, Chiou-Ting

    2014-12-01

    This paper presents a Bayesian image segmentation model based on Potts prior and loopy belief propagation. The proposed Bayesian model involves several terms, including the pairwise interactions of Potts models, and the average vectors and covariant matrices of Gauss distributions in color image modeling. These terms are often referred to as hyperparameters in statistical machine learning theory. In order to determine these hyperparameters, we propose a new scheme for hyperparameter estimation based on conditional maximization of entropy in the Potts prior. The algorithm is given based on loopy belief propagation. In addition, we compare our conditional maximum entropy framework with the conventional maximum likelihood framework, and also clarify how the first order phase transitions in loopy belief propagations for Potts models influence our hyperparameter estimation procedures.

  6. Making Connections in Math: Activating a Prior Knowledge Analogue Matters for Learning

    Science.gov (United States)

    Sidney, Pooja G.; Alibali, Martha W.

    2015-01-01

    This study investigated analogical transfer of conceptual structure from a prior-knowledge domain to support learning in a new domain of mathematics: division by fractions. Before a procedural lesson on division by fractions, fifth and sixth graders practiced with a surface analogue (other operations on fractions) or a structural analogue (whole…

  7. Long term leaching of silicate systems: testing procedure, actinides behaviour and mechanism

    International Nuclear Information System (INIS)

    Louwrier, K.; Matzke, H.; Ray, I.; Thiele, H.; Scheffler, K.; Riege, U.

    1977-06-01

    High-level waste borosilicate glasses and medium-level waste cement products have been leached with various aqueous solutions at ambient temperature. The leach rates of americium and plutonium are determined as well as the behaviour of the actinides in the boundary surface glass/leachant and in the leachant itself. Methods like light-scattering photometry and differential refractometry, molecular filtration, scanning electron microscopy and α-spectrometry of the energy-loss of α-particles in thin layers have been applied. From the experimental results a general model for the leaching mechanism has been established. A critical review of leach test procedures is accomplished aiming at the improvement of common tests with respect to the extrapolation of the obtained leach test data to final disposal safety considerations. (orig.) [de

  8. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  9. 12 CFR 219.6 - Payment procedures.

    Science.gov (United States)

    2010-01-01

    ... obtain payment of costs incurred prior to the time the financial institution receives this notice. [Reg... PROVIDING FINANCIAL RECORDS; RECORDKEEPING REQUIREMENTS FOR CERTAIN FINANCIAL RECORDS (REGULATION S) Reimbursement to Financial Institutions for Providing Financial Records § 219.6 Payment procedures. (a) Notice...

  10. 29 CFR 1928.52 - Protective frames for wheel-type agricultural tractors-test procedures and performance requirements.

    Science.gov (United States)

    2010-07-01

    ... a 4,410-lb (2,000-kg) weight acting as a pendulum. The impact face of the weight shall be 27 ± 1 in..., or blocking shift or break during the test, the test shall be repeated. (ii) H = Vertical height of... test procedure; and (C) Impact at side. The blocking and restraining shall conform to paragraphs (d)(3...

  11. Pre-exposure to food temptation reduces subsequent consumption: A test of the procedure with a South-African sample.

    Science.gov (United States)

    Duh, Helen Inseng; Grubliauskiene, Aiste; Dewitte, Siegfried

    2016-01-01

    It has been suggested that the consumption of unhealthy Westernized diet in a context of poverty and resultant food insecurity may have contributed to South-Africa's status of the third fattest country in the World. Considering that a number of South-Africans are reported to have experienced, or are still experiencing food insecurity, procedures which have been shown to reduce the consumption of unhealthy food in higher income countries may be ineffective in South-Africa. We thus tested the robustness of the so called pre-exposure procedure in South-Africa. We also tested the moderating role of childhood poverty in the pre-exposure procedure. With the pre-exposure procedure, a respondent is exposed to a tempting unhealthy food (e.g. candy) in a context that is designed such that eating the food interferes with a task goal. The typical result is that this procedure spills over and reduces consumption of similar tempting food later on. An experimental study conducted in a South-African laboratory showed that the pre-exposure effect is robust even with a sample, where food insecurity prevails. Childhood poverty did not moderate the effect. This study proves that behavioral procedures aimed at reducing the consumption of unhealthy food would be valuable in less rich non-Western countries. Further testing of the robustness of the pre-exposure effect is however recommended in other poorer food insecure countries. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. Test facility for PLT TF coils

    International Nuclear Information System (INIS)

    Hearney, J.; File, J.; Dreskin, S.

    1975-01-01

    Past experience with the model C stellerator and other toroidal field devices indicates that mechanical and electrical tests of a toroidal field coil prior to maximum field operation of the device is prudent and desirable. This paper describes a test program for the PLT-TF coils. The test stand consists of one test coil, two background coils and a steel supporting structure. The three coil configuration produces a 67.5 kG field at the inner conductor (38 kG at the bore center) and simulates a 1/R field distribution in the bore of the test coil. The resolution of the field force system and resultant stresses within the test structure are discussed. A test procedure is described which maximizes the information obtained from a 100,000 pulse program

  13. Testing and qualification of confidence in statistical procedures

    Energy Technology Data Exchange (ETDEWEB)

    Serghiuta, D.; Tholammakkil, J.; Hammouda, N. [Canadian Nuclear Safety Commission (Canada); O' Hagan, A. [Sheffield Univ. (United Kingdom)

    2014-07-01

    tests, but targeted to the context of the particular application and aimed at identifying the domain of validity of the proposed tolerance limit method and algorithm, might provide the necessary confidence in the proposed statistical procedure. The Ontario Power Generation, Bruce Power and AMEC-NSS have supported this work and contributed to the development and execution of the test cases. Their statistical method and results are not, however, discussed in this paper. (author)

  14. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    Science.gov (United States)

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2018-03-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  15. Developing Field Test Procedures for Chloride Stress Corrosion Cracking in the Arabian Gulf

    Directory of Open Access Journals (Sweden)

    Hanan Farhat

    2018-01-01

    Full Text Available Oil and gas production and petrochemical plants in the Arabian Gulf are exposed to severe environmental conditions of high temperature and humidity. This makes these plants susceptible to chloride-induced stress corrosion cracking (CSCC. The laboratory testing fails to provide the exact field environmental conditions. A cost efficient field test setup for CSCC was designed and developed for the Arabian Gulf. The setup included designing self-sustained loading devices, samples, and sample racks. The samples were exposed to a stress equivalent to 80% and 100% of their yield strength. This paper describes the developed test procedures to establish testing with high level of accuracy and repeatability. It also discusses the design aspects and the challenges that were met.

  16. Test objects for evaluating the performance of radiological imaging systems. Leeds radiological test objects

    International Nuclear Information System (INIS)

    Cowen, A.R.; Clarke, O.F.; Haywood, J.M.; Parker, R.P.

    1985-01-01

    A range of test objects has been developed to assess the imaging performance of conventional and digital radiological imaging systems. These test objects have arisen as a result of involvement in both the laboratory evaluation of radiological imaging systems and the routine maintenance of such equipment in a large diagnostic radiology department. The philosophy behind the design and application of the test objects is briefly described. Particular attention is paid to the advantages of using the threshold-contrast detail-detectability technique to assess overall imaging performance. The great importance of ensuring optimum imaging performance prior to clinical acceptance is stressed. A strategy for implementing the test objects in a clinical department is present. The diagnostic information content of the clinical images which result measures the success of the quality control procedure adopted. (author)

  17. Experimental Testing Procedures and Dynamic Model Validation for Vanadium Redox Flow Battery Storage System

    DEFF Research Database (Denmark)

    Baccino, Francesco; Marinelli, Mattia; Nørgård, Per Bromand

    2013-01-01

    The paper aims at characterizing the electrochemical and thermal parameters of a 15 kW/320 kWh vanadium redox flow battery (VRB) installed in the SYSLAB test facility of the DTU Risø Campus and experimentally validating the proposed dynamic model realized in Matlab-Simulink. The adopted testing...... efficiency of the battery system. The test procedure has general validity and could also be used for other storage technologies. The storage model proposed and described is suitable for electrical studies and can represent a general model in terms of validity. Finally, the model simulation outputs...

  18. Evaluating change in attitude towards mathematics using the 'then-now' procedure in a cooperative learning programme.

    Science.gov (United States)

    Townsend, Michael; Wilton, Keri

    2003-12-01

    Tertiary students' attitudes to mathematics are frequently negative and resistant to change, reflecting low self-efficacy. Some educators believe that greater use should be made of small group, collaborative teaching. However, the results of such interventions should be subject to assessments of bias caused by a shift in the frame of reference used by students in reporting their attitudes. This study was designed to assess whether traditional pretest-post-test procedures would indicate positive changes in mathematics attitude during a programme of cooperative learning, and whether an examination of any attitudinal change using the 'then-now' procedure would indicate bias in the results due to a shift in the internal standards for expressing attitude. Participants were 141 undergraduate students enrolled in a 12-week statistics and research design component of a course in educational psychology. Using multivariate procedures, pretest, post-test, and then-test measures of mathematics self-concept and anxiety were examined in conjunction with a cooperative learning approach to teaching. Significant positive changes between pretest and post-test were found for both mathematics self-concept and mathematics anxiety. There were no significant differences between the actual pretest and retrospective pretest measures of attitude. The results were not moderated by prior level of mathematics study. Conclusions about the apparent effectiveness of a cooperative learning programme were strengthened by the use of the retrospective pretest procedure.

  19. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  20. Fusion Bead Procedure for Nuclear Forensics Employing Synthetic Enstatite to Dissolve Uraniferous and Other Challenging Materials Prior to Laser Ablation Inductively Coupled Plasma Mass Spectrometry.

    Science.gov (United States)

    Reading, David G; Croudace, Ian W; Warwick, Phillip E

    2017-06-06

    There is an increasing demand for rapid and effective analytical tools to support nuclear forensic investigations of seized or suspect materials. Some methods are simply adapted from other scientific disciplines and can effectively be used to rapidly prepare complex materials for subsequent analysis. A novel sample fusion method is developed, tested, and validated to produce homogeneous, flux-free glass beads of geochemical reference materials (GRMs), uranium ores, and uranium ore concentrates (UOC) prior to the analysis of 14 rare earth elements (REE) via laser ablation inductively coupled plasma mass spectrometry (LA-ICP-MS). The novelty of the procedure is the production of glass beads using 9 parts high purity synthetic enstatite (MgSiO 3 ) as the glass former with 1 part of sample (sample mass ∼1.5 mg). The beads are rapidly prepared (∼10 min overall time) by fusing the blended mixture on an iridium strip resistance heater in an argon-purged chamber. Many elements can be measured in the glass bead, but the rare earth group in particular is a valuable series in nuclear forensic studies and is well-determined using LA-ICP-MS. The REE data obtained from the GRMs, presented as chondrite normalized patterns, are in very good agreement with consensus patterns. The UOCs have comparable patterns to solution ICP-MS methods and published data. The attractions of the current development are its conservation of sample, speed of preparation, and suitability for microbeam analysis, all of which are favorable for nuclear forensics practitioners and geochemists requiring REE patterns from scarce or valuable samples.

  1. Occupational exposures from selected interventional radiological procedures

    International Nuclear Information System (INIS)

    Janeczek, J.; Beal, A.; James, D.

    2001-01-01

    The number of radiology and cardiology interventional procedures has significantly increased in recent years due to better diagnostic equipment resulting in an increase in radiation dose to the staff and patients. The assessment of staff doses was performed for cardiac catheterization and for three other non-cardiac procedures. The scattered radiation distribution resulting from the cardiac catheterization procedure was measured prior to the staff dose measurements. Staff dose measurements included those of the left shoulder, eye, thyroid and hand doses of the cardiologist. In non-cardiac procedures doses to the hands of the radiologist were measured for nephrostomy, fistulogram and percutaneous transluminal angioplasty procedures. Doses to the radiologist or cardiologist were found to be relatively high if correct protection was not observed. (author)

  2. Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

    Science.gov (United States)

    Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

  3. Containment integrity and leak testing. Procedures applied and experiences gained in European countries

    International Nuclear Information System (INIS)

    1987-01-01

    Containment systems are the ultimate safety barrier for preventing the escape of gaseous, liquid and solid radioactive materials produced in normal operation, not retained in process systems, and for keeping back radioactive materials released by system malfunction or equipment failure. A primary element of the containment shell is therefore its leak-tight design. The report describes the present containment concepts mostly used in European countries. The leak-testing procedures applied and the experiences gained in their application are also discussed. The report refers more particularly to pre-operational testing, periodic testing and extrapolation methods of leak rates measured at test conditions to expected leak rates at calculated accident conditions. The actual problems in periodic containment leak rate testing are critically reviewed. In the appendix to the report a summary is given of the regulations and specifications applied in different member countries

  4. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  5. Procedure guideline for radioiodine test (version 3); Verfahrensanweisung zum Radioiodtest (Version 3)

    Energy Technology Data Exchange (ETDEWEB)

    Dietlein, M.; Schicha, H. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Koeln Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Dressler, J. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Nuklearmedizinische Klinik der Henriettenstiftung, Hannover (Germany); Eschner, W. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Deutsche Gesellschaft fuer Medizinische Physik (DGMP) (Germany); Koeln Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Lassmann, M. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Deutsche Gesellschaft fuer Medizinische Physik (DGMP) (Germany); Wuerzburg Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Leisner, B. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Allgemeines Krankenhaus St. Georg, Hamburg (Germany). Abt. fuer Nuklearmedizin; Reiners, C. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Wuerzburg Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin

    2007-07-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  6. Methods for testing the logical structure of plant procedure documents

    International Nuclear Information System (INIS)

    Horne, C.P.; Colley, R.; Fahley, J.M.

    1990-01-01

    This paper describes an ongoing EPRI project to investigate computer based methods to improve the development, maintenance, and verification of plant operating procedures. This project began as an evaluation of the applicability of structured software analysis methods to operating procedures. It was found that these methods offer benefits, if procedures are transformed to a structured representation to make them amenable to computer analysis. The next task was to investigate methods to transform procedures into a structured representation. The use of natural language techniques to read and compile the procedure documents appears to be viable for this purpose and supports conformity to guidelines. The final task was to consider possibilities of automated verification methods for procedures. Methods to help verify procedures were defined and information requirements specified. These methods take the structured representation of procedures as input. The software system being constructed in this project is called PASS, standing for Procedures Analysis Software System

  7. Rail Impact Testing. Test Operations Procedure (TOP)

    Science.gov (United States)

    2008-09-15

    impact test. The rail impact test is used to verify structural integrity of the test item and the adequacy of the tie-down system and tie-down...strength of provisions, connection and supporting structural frame, paragraph 5.2.3 ** Superscript...parts, to include outriggers and booms) without advanced approval by SDDCTEA. Torque nuts on wire rope clips to their correct value. Torque cable

  8. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  9. 76 FR 63211 - Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating...

    Science.gov (United States)

    2011-10-12

    ... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2011-BT-TP-0042] RIN 1904-AC53 Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating Equipment, and Pool Heaters AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Request for...

  10. 17 CFR 270.30a-3 - Controls and procedures.

    Science.gov (United States)

    2010-04-01

    ... and procedures, within the 90-day period prior to the filing date of each report on Form N-CSR (§§ 249... to be disclosed by the investment company on Form N-CSR (§§ 249.331 and 274.128 of this chapter) and... include, without limitation, controls and procedures designed to ensure that information required to be...

  11. Preoperative testing and risk assessment: perspectives on patient selection in ambulatory anesthetic procedures

    Directory of Open Access Journals (Sweden)

    Stierer TL

    2015-08-01

    Full Text Available Tracey L Stierer,1,2 Nancy A Collop3,41Department of Anesthesiology, 2Department of Critical Care Medicine, Otolaryngology Head and Neck Surgery, Johns Hopkins Medicine, Baltimore, MD, USA; 3Department of Medicine, 4Department of Neurology, Emory University, Emory Sleep Center, Wesley Woods Center, Atlanta, GA, USAAbstract: With recent advances in surgical and anesthetic technique, there has been a growing emphasis on the delivery of care to patients undergoing ambulatory procedures of increasing complexity. Appropriate patient selection and meticulous preparation are vital to the provision of a safe, quality perioperative experience. It is not unusual for patients with complex medical histories and substantial systemic disease to be scheduled for discharge on the same day as their surgical procedure. The trend to “push the envelope” by triaging progressively sicker patients to ambulatory surgical facilities has resulted in a number of challenges for the anesthesia provider who will assume their care. It is well known that certain patient diseases are associated with increased perioperative risk. It is therefore important to define clinical factors that warrant more extensive testing of the patient and medical conditions that present a prohibitive risk for an adverse outcome. The preoperative assessment is an opportunity for the anesthesia provider to determine the status and stability of the patient’s health, provide preoperative education and instructions, and offer support and reassurance to the patient and the patient’s family members. Communication between the surgeon/proceduralist and the anesthesia provider is critical in achieving optimal outcome. A multifaceted approach is required when considering whether a specific patient will be best served having their procedure on an outpatient basis. Not only should the patient's comorbidities be stable and optimized, but details regarding the planned procedure and the resources available

  12. Dermal and inhalation acute toxic class methods: test procedures and biometric evaluations for the Globally Harmonized Classification System.

    Science.gov (United States)

    Holzhütter, H G; Genschow, E; Diener, W; Schlede, E

    2003-05-01

    The acute toxic class (ATC) methods were developed for determining LD(50)/LC(50) estimates of chemical substances with significantly fewer animals than needed when applying conventional LD(50)/LC(50) tests. The ATC methods are sequential stepwise procedures with fixed starting doses/concentrations and a maximum of six animals used per dose/concentration. The numbers of dead/moribund animals determine whether further testing is necessary or whether the test is terminated. In recent years we have developed classification procedures for the oral, dermal and inhalation routes of administration by using biometric methods. The biometric approach assumes a probit model for the mortality probability of a single animal and assigns the chemical to that toxicity class for which the best concordance is achieved between the statistically expected and the observed numbers of dead/moribund animals at the various steps of the test procedure. In previous publications we have demonstrated the validity of the biometric ATC methods on the basis of data obtained for the oral ATC method in two-animal ring studies with 15 participants from six countries. Although the test procedures and biometric evaluations for the dermal and inhalation ATC methods have already been published, there was a need for an adaptation of the classification schemes to the starting doses/concentrations of the Globally Harmonized Classification System (GHS) recently adopted by the Organization for Economic Co-operation and Development (OECD). Here we present the biometric evaluation of the dermal and inhalation ATC methods for the starting doses/concentrations of the GHS and of some other international classification systems still in use. We have developed new test procedures and decision rules for the dermal and inhalation ATC methods, which require significantly fewer animals to provide predictions of toxicity classes, that are equally good or even better than those achieved by using the conventional LD(50)/LC

  13. Doping control in Japan. An automated extraction procedure for the doping test.

    Science.gov (United States)

    Nakajima, T.; Matsumoto, T.

    1976-01-01

    Horse racing in Japan consists of two systems, the National (10 racecourses) and the Regional public racing (32 racecourses) having about 2,500 racing meetings in total per year. Urine or saliva samples for dope testing are collected by the officials from thw winner, second and third, and transported to the laboratory in a frozen state. In 1975, 76, 117 samples were analyzed by this laboratory. The laboratory provides the following four methods of analysis, which are variously combined by request. (1) Method for detection of drugs extracted by chloroform from alkalinized sample. (2) Methods for detection of camphor and its derivatives. (3) Method for detection of barbiturates. (4) Method for detection of ethanol. These methods consist of screening, mainly by thin layer chromatography and confirmatory tests using ultra violet spectrophotometry, gas chromatography and mass spectrometry combined with gas chromatography. In the screening test of doping drugs, alkalinized samples are extracted with chloroform. In order to automate the extraction procedure, the authors contrived a new automatic extractor. They also devised a means of pH adjustment of horse urine by using buffer solution and an efficient mechanism of evaporation of organic solvent. Analytical data obtained by the automatic extractor are presented in this paper. In 1972, we started research work to automate the extraction procedure in method (1) above, and the Automatic Extractor has been in use in routine work since last July. One hundred and twnety samples per hour are extracted automatically by three automatic extractors. The analytical data using this apparatus is presented below. PMID:1000163

  14. Constrained noninformative priors

    International Nuclear Information System (INIS)

    Atwood, C.L.

    1994-10-01

    The Jeffreys noninformative prior distribution for a single unknown parameter is the distribution corresponding to a uniform distribution in the transformed model where the unknown parameter is approximately a location parameter. To obtain a prior distribution with a specified mean but with diffusion reflecting great uncertainty, a natural generalization of the noninformative prior is the distribution corresponding to the constrained maximum entropy distribution in the transformed model. Examples are given

  15. The Verification of ESF-CCS Integration Test procedure by utilizing Lab view

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jayoung; Lee, Sangseok; Sohn, Kwangyoung [Korea Reliability Technology and System, Daejeon (Korea, Republic of); Lee, Junku; Park, Geunok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    Since the Fukushima event, especially it is considered to be important to guarantee the safety of plant by mitigating the major accident. ESF-CCS (Engineered Safety Feature-Component Control System) is monitoring all the plant variables and generates the ESF-CCS actuation signals when the plant variables violate the setpoint. Taking a look at the classic design, ESF-CCS is composed of the sub-components such as Minimum Inventory (MI), ESCM (ESF-CCS Soft Control Module), CPM, ITP, Group Controller (GC), Loop Controller (LC), CCG (Control Channel Gate), MTP, CIM (Component Interface Module). By help of Lab view simulation in integration test procedure preparation, the following benefits are attained; - Control logic and design evaluation by Lab view - Eliminating the time-consuming test case design, and determining the 'expected result' with design validation - The reliability upgrade of integration test quality.

  16. Superflux chlorophyll-a analysis: An assessment of variability in results introduced prior to fluorometric analysis. [chesapeake bay and shelf regions

    Science.gov (United States)

    Cibik, S. J.; Rutledge, C. K.; Robertson, C. N.

    1981-01-01

    Several experiments were undertaken to identify variability in results that came from procedural differences in the processing of chlorophyll samples prior to fluorometric analysis. T-tests on group means indicated that significant differences (alpha = 0.05) in phaeopigment a concentrations did result in samples not initially screened, but not in the chlorophyll a concentrations. Highly significant differences (alpha = 0.001) in group means were found in samples which were held in acetone after filtering as compared to unfiltered seawater samples held for the same period. No difference in results was found between the 24-hour extraction and samples which were processed immediately.

  17. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  18. 45 CFR 1326.23 - Hearing procedures.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO INDIAN TRIBES FOR SUPPORT AND NUTRITION SERVICES § 1326.23 Hearing procedures. In meeting the... Administration on Aging; (3) Present written evidence prior to and at the hearing, and present oral evidence at...

  19. Testing of Composite Fan Vanes With Erosion-Resistant Coating Accelerated

    Science.gov (United States)

    Bowman, Cheryl L.; Sutter, James K.; Otten, Kim D.; Samorezov, Sergey; Perusek, Gail P.

    2004-01-01

    The high-cycle fatigue of composite stator vanes provided an accelerated life-state prior to insertion in a test stand engine. The accelerated testing was performed in the Structural Dynamics Laboratory at the NASA Glenn Research Center under the guidance of Structural Mechanics and Dynamics Branch personnel. Previous research on fixturing and test procedures developed at Glenn determined that engine vibratory conditions could be simulated for polymer matrix composite vanes by using the excitation of a combined slip table and electrodynamic shaker in Glenn's Structural Dynamics Laboratory. Bench-top testing gave researchers the confidence to test the coated vanes in a full-scale engine test.

  20. Performance testing of HEPA filters: Progress towards a European standard procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  1. Warm-Up Effect in Panelist-Articulated-2-Alternative Forced Choice Test.

    Science.gov (United States)

    Bloom, David J; Baik, Hwa-Young; Lee, Soo-Yeun

    2018-01-01

    Panelist performance in discrimination tests has been shown to increase when warm-up samples are provided prior to the actual test. Samples are used prior to the actual test for the attribute articulation process of a panelist-articulated-2-alternative forced choice (PA-2-AFC) procedure; however, it is yet unknown if the pretest articulation phase adds to the power of this testing method as with the warm-up. The goal of the study was to determine if a "warm-up" effect was displayed in the PA-2-AFC test resulting in greater power compared to the researcher-designated-2-AFC (RD-2-AFC) test. A RD-2-AFC test, with and without warm-up samples, and a PA-2-AFC test were performed by 61 panelists. A reduced calorie, citrus-flavored, and carbonated beverage was used in the tests. During RD-2-AFC testing, panelists were asked to identify which sample was more sour. For PA-2-AFC testing, panelists individually articulated the nature and direction of the difference between the 2 samples through a pretesting articulation procedure. The articulated difference was, then, used in standard 2-AFC test procedure. A warm-up effect was observed when comparing the standard RD-2-AFC with and without warm-up samples. The addition of warm up samples significantly increased the power of the test, in addition, the PA-2-AFC method had lower power than the RD-2-AFC method. The increase in power with the addition of warm-up samples for the RD-2-AFC procedure supports literature findings on the benefit of providing warm-up samples. No warm-up effect can be attributed to the PA-2-AFC method evidenced by the overall low power observed, which may be attributed to sample complexity. Selecting a specified discrimination testing method is advantageous and can reduce costs of sensory testing, but has been considered unpractical when samples may differ in unknown ways. This research explores the use of panelist derived terms to circumvent the need for researchers to identify these differences and

  2. Contribution of Prior Semantic Knowledge to New Episodic Learning in Amnesia

    Science.gov (United States)

    Kan, Irene P.; Alexander, Michael P.; Verfaellie, Mieke

    2009-01-01

    We evaluated whether prior semantic knowledge would enhance episodic learning in amnesia. Subjects studied prices that are either congruent or incongruent with prior price knowledge for grocery and household items and then performed a forced-choice recognition test for the studied prices. Consistent with a previous report, healthy controls'…

  3. qPR: An adaptive partial-report procedure based on Bayesian inference.

    Science.gov (United States)

    Baek, Jongsoo; Lesmes, Luis Andres; Lu, Zhong-Lin

    2016-08-01

    Iconic memory is best assessed with the partial report procedure in which an array of letters appears briefly on the screen and a poststimulus cue directs the observer to report the identity of the cued letter(s). Typically, 6-8 cue delays or 600-800 trials are tested to measure the iconic memory decay function. Here we develop a quick partial report, or qPR, procedure based on a Bayesian adaptive framework to estimate the iconic memory decay function with much reduced testing time. The iconic memory decay function is characterized by an exponential function and a joint probability distribution of its three parameters. Starting with a prior of the parameters, the method selects the stimulus to maximize the expected information gain in the next test trial. It then updates the posterior probability distribution of the parameters based on the observer's response using Bayesian inference. The procedure is reiterated until either the total number of trials or the precision of the parameter estimates reaches a certain criterion. Simulation studies showed that only 100 trials were necessary to reach an average absolute bias of 0.026 and a precision of 0.070 (both in terms of probability correct). A psychophysical validation experiment showed that estimates of the iconic memory decay function obtained with 100 qPR trials exhibited good precision (the half width of the 68.2% credible interval = 0.055) and excellent agreement with those obtained with 1,600 trials of the conventional method of constant stimuli procedure (RMSE = 0.063). Quick partial-report relieves the data collection burden in characterizing iconic memory and makes it possible to assess iconic memory in clinical populations.

  4. The inSIGHT study: costs and effects of routine hysteroscopy prior to a first IVF treatment cycle. A randomised controlled trial

    Directory of Open Access Journals (Sweden)

    Smit Janine G

    2012-08-01

    Full Text Available Abstract Background In in vitro fertilization (IVF and intracytoplasmatic sperm injection (ICSI treatment a large drop is present between embryo transfer and occurrence of pregnancy. The implantation rate per embryo transferred is only 30%. Studies have shown that minor intrauterine abnormalities can be found in 11–45% of infertile women with a normal transvaginal sonography or hysterosalpingography. Two randomised controlled trials have indicated that detection and treatment of these abnormalities by office hysteroscopy after two failed IVF cycles leads to a 9–13% increase in pregnancy rate. Therefore, screening of all infertile women for intracavitary pathology prior to the start of IVF/ICSI is increasingly advocated. In absence of a scientific basis for such a policy, this study will assess the effects and costs of screening for and treatment of unsuspected intrauterine abnormalities by routine office hysteroscopy, with or without saline infusion sonography (SIS, prior to a first IVF/ICSI cycle. Methods/design Multicenter randomised controlled trial in asymptomatic subfertile women, indicated for a first IVF/ICSI treatment cycle, with normal findings at transvaginal sonography. Women with recurrent miscarriages, prior hysteroscopy treatment and intermenstrual blood loss will not be included. Participants will be randomised for a routine fertility work-up with additional (SIS and hysteroscopy with on-the-spot-treatment of predefined intrauterine abnormalities versus the regular fertility work-up without additional diagnostic tests. The primary study outcome is the cumulative ongoing pregnancy rate resulting in live birth achieved within 18 months of IVF/ICSI treatment after randomisation. Secondary study outcome parameters are the cumulative implantation rate; cumulative miscarriage rate; patient preference and patient tolerance of a SIS and hysteroscopy procedure. All data will be analysed according to the intention-to-treat principle

  5. Improving Bayesian credibility intervals for classifier error rates using maximum entropy empirical priors.

    Science.gov (United States)

    Gustafsson, Mats G; Wallman, Mikael; Wickenberg Bolin, Ulrika; Göransson, Hanna; Fryknäs, M; Andersson, Claes R; Isaksson, Anders

    2010-06-01

    Successful use of classifiers that learn to make decisions from a set of patient examples require robust methods for performance estimation. Recently many promising approaches for determination of an upper bound for the error rate of a single classifier have been reported but the Bayesian credibility interval (CI) obtained from a conventional holdout test still delivers one of the tightest bounds. The conventional Bayesian CI becomes unacceptably large in real world applications where the test set sizes are less than a few hundred. The source of this problem is that fact that the CI is determined exclusively by the result on the test examples. In other words, there is no information at all provided by the uniform prior density distribution employed which reflects complete lack of prior knowledge about the unknown error rate. Therefore, the aim of the study reported here was to study a maximum entropy (ME) based approach to improved prior knowledge and Bayesian CIs, demonstrating its relevance for biomedical research and clinical practice. It is demonstrated how a refined non-uniform prior density distribution can be obtained by means of the ME principle using empirical results from a few designs and tests using non-overlapping sets of examples. Experimental results show that ME based priors improve the CIs when employed to four quite different simulated and two real world data sets. An empirically derived ME prior seems promising for improving the Bayesian CI for the unknown error rate of a designed classifier. Copyright 2010 Elsevier B.V. All rights reserved.

  6. Spectrophotometric determination of boron in water with prior distillation and hydrolysis of the methyl borate

    International Nuclear Information System (INIS)

    Monzo, J.; Pomares, F.; Guardia, M. de la

    1988-01-01

    A procedure for the determination of boron in irrigation waters is proposed, involving the prior distillation and hydrolysis of methyl borate and subsequent spectrophotometric determination with azomethine-H. The selectivity is better than that of the direct analysis method. (author)

  7. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  8. Segmentation of kidney using C-V model and anatomy priors

    Science.gov (United States)

    Lu, Jinghua; Chen, Jie; Zhang, Juan; Yang, Wenjia

    2007-12-01

    This paper presents an approach for kidney segmentation on abdominal CT images as the first step of a virtual reality surgery system. Segmentation for medical images is often challenging because of the objects' complicated anatomical structures, various gray levels, and unclear edges. A coarse to fine approach has been applied in the kidney segmentation using Chan-Vese model (C-V model) and anatomy prior knowledge. In pre-processing stage, the candidate kidney regions are located. Then C-V model formulated by level set method is applied in these smaller ROI, which can reduce the calculation complexity to a certain extent. At last, after some mathematical morphology procedures, the specified kidney structures have been extracted interactively with prior knowledge. The satisfying results on abdominal CT series show that the proposed approach keeps all the advantages of C-V model and overcome its disadvantages.

  9. 75 FR 22213 - Energy Conservation Program: Test Procedures for General Service Fluorescent Lamps, Incandescent...

    Science.gov (United States)

    2010-04-28

    ..., Department of Energy. ACTION: Final rule; technical amendments. SUMMARY: This document contains a technical... test procedure regulations for the above-specified lamps. However, due to a drafting error, part of the.... Since the publication of that rule, it has come to DOE's attention that, due to a technical oversight, a...

  10. 75 FR 34064 - Manufactured Home Construction and Safety Standards, Test Procedures for Roof Trusses

    Science.gov (United States)

    2010-06-16

    ... failure. Failure is rupture, fracture, or excessive yielding. (v) Final recovery phase. Remove 2.0 times... members of the public. Commenters should follow the instructions provided on that site to submit comments... nondestructive testing procedure for roof trusses that permits a lower overall factor of safety to be used in...

  11. Facilities and procedures used for the performance testing of DOE personnel dosimetry systems

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for /sup 137/Cs, several beta-particle emitters, /sup 252/Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate.

  12. Facilities and procedures used for the performance testing of DOE personnel-dosimetry systems

    International Nuclear Information System (INIS)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for 137 Cs, several beta-particle emitters, 252 Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate

  13. Nuclear electronic equipment for control and monitoring panel. Procedure guide for on-site tests of nuclear reactor instruments

    International Nuclear Information System (INIS)

    1975-10-01

    By the use of a procedure for on-site testing of nuclear reactor instruments it should be possible to judge their ability to guarantee the reactor safety and availability at the moment of divergence or during operation. Such a procedure must therefore be created as a work implement for the quick and reliable installation of electronic devices necessary for nuclear reactor control and supervision. A standard document is proposed for this purpose, allowing a ''test programme'' to be set up before the equipment is installed on the site [fr

  14. 75 FR 2122 - Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of...

    Science.gov (United States)

    2010-01-14

    ... Energy Consumption of Refrigerator-Freezers With Automatic Ice Makers AGENCY: Office of the General...) to prescribe standardized test procedures to measure the energy consumption of certain consumer... Energy Consumption of Electric Refrigerators and Electric Refrigerator- Freezers (Appendix A1). DOE...

  15. 75 FR 52892 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2010-08-30

    ... ``Energy Conservation Program for Consumer Products Other Than Automobiles,'' including residential water... final rule revising energy conservation standards for residential water heaters, direct heating.... EERE-2009-BT-TP-0013] RIN 1904-AB95 Energy Conservation Program for Consumer Products: Test Procedures...

  16. Standard Test Method for Wet Insulation Integrity Testing of Photovoltaic Arrays

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This test method covers a procedure to determine the insulation resistance of a photovoltaic (PV) array (or its component strings), that is, the electrical resistance between the array's internal electrical components and is exposed, electrically conductive, non-current carrying parts and surfaces of the array. 1.2 This test method does not establish pass or fail levels. The determination of acceptable or unacceptable results is beyond the scope of this test method. 1.3 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  17. Bayesian nonparametric system reliability using sets of priors

    NARCIS (Netherlands)

    Walter, G.M.; Aslett, L.J.M.; Coolen, F.P.A.

    2016-01-01

    An imprecise Bayesian nonparametric approach to system reliability with multiple types of components is developed. This allows modelling partial or imperfect prior knowledge on component failure distributions in a flexible way through bounds on the functioning probability. Given component level test

  18. A flexible and coherent test/estimation procedure based on restricted mean survival times for censored time-to-event data in randomized clinical trials.

    Science.gov (United States)

    Horiguchi, Miki; Cronin, Angel M; Takeuchi, Masahiro; Uno, Hajime

    2018-04-22

    In randomized clinical trials where time-to-event is the primary outcome, almost routinely, the logrank test is prespecified as the primary test and the hazard ratio is used to quantify treatment effect. If the ratio of 2 hazard functions is not constant, the logrank test is not optimal and the interpretation of hazard ratio is not obvious. When such a nonproportional hazards case is expected at the design stage, the conventional practice is to prespecify another member of weighted logrank tests, eg, Peto-Prentice-Wilcoxon test. Alternatively, one may specify a robust test as the primary test, which can capture various patterns of difference between 2 event time distributions. However, most of those tests do not have companion procedures to quantify the treatment difference, and investigators have fallen back on reporting treatment effect estimates not associated with the primary test. Such incoherence in the "test/estimation" procedure may potentially mislead clinicians/patients who have to balance risk-benefit for treatment decision. To address this, we propose a flexible and coherent test/estimation procedure based on restricted mean survival time, where the truncation time τ is selected data dependently. The proposed procedure is composed of a prespecified test and an estimation of corresponding robust and interpretable quantitative treatment effect. The utility of the new procedure is demonstrated by numerical studies based on 2 randomized cancer clinical trials; the test is dramatically more powerful than the logrank, Wilcoxon tests, and the restricted mean survival time-based test with a fixed τ, for the patterns of difference seen in these cancer clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  19. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  20. How to reduce errors in applying impairment tests

    OpenAIRE

    Petersen, Christian; Plenborg, Thomas

    2007-01-01

    Fair value accounting has become predominant in accounting as a vast number of IAS/IFRS standards are based on fair value accounting, including IAS 36 Impairment of assets. Fair value accounting for goodwill is technically challenging, since market prices are not observable. Thus, valuation technologies must be applied in order to test goodwill for impairment. While prior research on goodwill has concentrated on either the (dis)advantages for each accounting procedure for goodwill or exami...

  1. PET reconstruction via nonlocal means induced prior.

    Science.gov (United States)

    Hou, Qingfeng; Huang, Jing; Bian, Zhaoying; Chen, Wufan; Ma, Jianhua

    2015-01-01

    The traditional Bayesian priors for maximum a posteriori (MAP) reconstruction methods usually incorporate local neighborhood interactions that penalize large deviations in parameter estimates for adjacent pixels; therefore, only local pixel differences are utilized. This limits their abilities of penalizing the image roughness. To achieve high-quality PET image reconstruction, this study investigates a MAP reconstruction strategy by incorporating a nonlocal means induced (NLMi) prior (NLMi-MAP) which enables utilizing global similarity information of image. The present NLMi prior approximates the derivative of Gibbs energy function by an NLM filtering process. Specially, the NLMi prior is obtained by subtracting the current image estimation from its NLM filtered version and feeding the residual error back to the reconstruction filter to yield the new image estimation. We tested the present NLMi-MAP method with simulated and real PET datasets. Comparison studies with conventional filtered backprojection (FBP) and a few iterative reconstruction methods clearly demonstrate that the present NLMi-MAP method performs better in lowering noise, preserving image edge and in higher signal to noise ratio (SNR). Extensive experimental results show that the NLMi-MAP method outperforms the existing methods in terms of cross profile, noise reduction, SNR, root mean square error (RMSE) and correlation coefficient (CORR).

  2. The urine marker test

    DEFF Research Database (Denmark)

    Elbe, Anne-Marie; Jensen, Stine Nylandsted; Elsborg, Peter

    2016-01-01

    BACKGROUND: Urine sample collection for doping control tests is a key component of the World Anti-Doping Agency's fight against doping in sport. However, a substantial number of athletes experience difficulty when having to urinate under supervision. Furthermore, it cannot always be ensured...... that athletes are actually delivering their own urine. A method that can be used to alleviate the negative impact of a supervised urination procedure and which can also identify urine as coming from a specific athlete is the urine marker test. Monodisperse low molecular weight polyethylene glycols (PEGs......) are given orally prior to urination. Urine samples can be traced to the donor by analysis of the PEGs previously given. OBJECTIVE: The objective of this study was to investigate the use of the urine marker during urine doping control testing. METHODS: Two studies investigated athletes' acceptance...

  3. INEL test reactor facility alarms: descriptions, technical specifications, and modification procedure

    International Nuclear Information System (INIS)

    Potash, L.M.; Boone, M.P.

    1980-04-01

    This report identifies standards, procedures, and practices which will affect any attempt to integrate or introduce human engineering principles into nuclear power plant alarm systems. Additional information concerning type of signal used, expected reaction, type of sensor, etc., is presented because of its relevance to future work on alarm system integration. The INEL test reactors were studied. Interviews were conducted with operators, designers, and management personnel. Additional information was obtained from available documentation. Only fire-alarm systems, and to a lesser extent, criticality alarms, have detailed industry-wide standards. One general standard has been written for control-room annunciators

  4. Developing standard performance testing procedures for MC and A components at a site

    International Nuclear Information System (INIS)

    Scherer, Carolynn

    2010-01-01

    The condition of a nuclear material control and accountability system (MC and A) and its individual components, as with any system combining technical elements, documentation and the human factor, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC and A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following elements and subsystems or components for a material control and accountability system: (1) MC and A Elements: Information subsystem, Measurement subsystem, NM access subsystem, including a tamper-indicating device (TID) program, and Automated information-gathering subsystem; and (2) Detecting NM Loses Elements: Inventory differences, Shipper/receiver differences, Confirmatory measurements and differences with accounting data, and TID or seal violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems (from the list above). Additionally this work includes a review of the status of regulatory requirements for the MC and A system components and potential criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC and A performance-testing procedures were the basis for a pilot Guide for MC and A Performance Testing at the MBAs of SSC RF IPPE.

  5. Assessment of Calculation Procedures for Piles in Clay Based on Static Loading Tests

    DEFF Research Database (Denmark)

    Augustesen, Anders; Andersen, Lars

    2008-01-01

    College in London. The calculation procedures are assessed based on an established database of static loading tests. To make a consistent evaluation of the design methods, corrections related to undrained shear strength and time between pile driving and testing have been employed. The study indicates...... that the interpretation of the field tests is of paramount importance, both with regard to the soil profile and the loading conditions. Based on analyses of 253 static pile loading tests distributed on 111 sites, API-RP2A provides the better description of the data. However, it should be emphasised that some input......Numerous methods are available for the prediction of the axial capacity of piles in clay. In this paper, two well-known models are considered, namely the current API-RP2A (1987 to present) and the recently developed ICP method. The latter is developed by Jardine and his co-workers at Imperial...

  6. Practicability of passenger vehicle driving emission tests according to new European Union procedures

    Directory of Open Access Journals (Sweden)

    Pielecha Jacek

    2017-01-01

    Full Text Available The article compares driving test data using the latest legislative proposals applicable to passenger cars. Several measurements were performed on the same test route in accordance with the RDE test guidelines, which requires a number of criteria to be met. These criteria include: the length of the measuring segments, their overall test time share, and the dynamic characteristics of the drive. A mobile device for reading the EOBD System information was used to record the engine and vehicle operating parameters during tests. This allowed for the monitoring of parameters such as: load value, engine speed and vehicle velocity. The obtained results were then analyzed for their compatibility with the RDE procedure requirements. Despite the same research route, the obtained results were not the same. The analysis also uses the two-dimensional operating time share characteristics expressed in vehicle velocity and acceleration co-ordinates. As a result it was possible to compare the dynamic properties, share of operating time and, consequently, to check the validity of conducted drive tests in terms of their practicability and emission values.

  7. Gestures make memories, but what kind? Patients with impaired procedural memory display disruptions in gesture production and comprehension.

    Science.gov (United States)

    Klooster, Nathaniel B; Cook, Susan W; Uc, Ergun Y; Duff, Melissa C

    2014-01-01

    Hand gesture, a ubiquitous feature of human interaction, facilitates communication. Gesture also facilitates new learning, benefiting speakers and listeners alike. Thus, gestures must impact cognition beyond simply supporting the expression of already-formed ideas. However, the cognitive and neural mechanisms supporting the effects of gesture on learning and memory are largely unknown. We hypothesized that gesture's ability to drive new learning is supported by procedural memory and that procedural memory deficits will disrupt gesture production and comprehension. We tested this proposal in patients with intact declarative memory, but impaired procedural memory as a consequence of Parkinson's disease (PD), and healthy comparison participants with intact declarative and procedural memory. In separate experiments, we manipulated the gestures participants saw and produced in a Tower of Hanoi (TOH) paradigm. In the first experiment, participants solved the task either on a physical board, requiring high arching movements to manipulate the discs from peg to peg, or on a computer, requiring only flat, sideways movements of the mouse. When explaining the task, healthy participants with intact procedural memory displayed evidence of their previous experience in their gestures, producing higher, more arching hand gestures after solving on a physical board, and smaller, flatter gestures after solving on a computer. In the second experiment, healthy participants who saw high arching hand gestures in an explanation prior to solving the task subsequently moved the mouse with significantly higher curvature than those who saw smaller, flatter gestures prior to solving the task. These patterns were absent in both gesture production and comprehension experiments in patients with procedural memory impairment. These findings suggest that the procedural memory system supports the ability of gesture to drive new learning.

  8. Prior-to-Exam: What Activities Enhance Performance?

    Science.gov (United States)

    Rhoads, C. J.; Healy, Therese

    2013-01-01

    Can instructors impact their student performance by recommending an activity just prior to taking an exam? In this study, college students were randomly assigned to one of three treatment groups (study, exercise, or meditation) or a control group. Each group was given two different types of tests; a traditional concept exam, and a non-traditional…

  9. 78 FR 2340 - Energy Conservation Program: Test Procedures for Residential Water Heaters and Commercial Water...

    Science.gov (United States)

    2013-01-11

    ... corresponded to the levels in the American Society of Heating, Refrigerating and Air Conditioning Engineers... provides a brief history of DOE's more recent test procedure rulemakings related to residential water... performance (e.g., such as ambient air temperature, ambient relative humidity, and inlet water temperature...

  10. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    DEFF Research Database (Denmark)

    Hunter, R.; Friis Pedersen, Troels; Dunbabin, P.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard forwind turbine power performance testing....... The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project itdescribes, has been designed to help provide a solid technical foundation for this revised...... standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support offundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle...

  11. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  12. Towards Patient-Tailored Perimetry: Automated Perimetry Can Be Improved by Seeding Procedures With Patient-Specific Structural Information

    Science.gov (United States)

    Denniss, Jonathan; McKendrick, Allison M.; Turpin, Andrew

    2013-01-01

    Purpose: To explore the performance of patient-specific prior information, for example, from structural imaging, in improving perimetric procedures. Methods: Computer simulation was used to determine the error distribution and presentation count for Structure–Zippy Estimation by Sequential Testing (ZEST), a Bayesian procedure with prior distribution centered on a threshold prediction from structure. Structure-ZEST (SZEST) was trialled for single locations with combinations of true and predicted thresholds between 1 to 35 dB, and compared with a standard procedure with variability similar to Swedish Interactive Thresholding Algorithm (SITA) (Full-Threshold, FT). Clinical tests of glaucomatous visual fields (n = 163, median mean deviation −1.8 dB, 90% range +2.1 to −22.6 dB) were also compared between techniques. Results: For single locations, SZEST typically outperformed FT when structural predictions were within ± 9 dB of true sensitivity, depending on response errors. In damaged locations, mean absolute error was 0.5 to 1.8 dB lower, SD of threshold estimates was 1.2 to 1.5 dB lower, and 2 to 4 (29%–41%) fewer presentations were made for SZEST. Gains were smaller across whole visual fields (SZEST, mean absolute error: 0.5 to 1.2 dB lower, threshold estimate SD: 0.3 to 0.8 dB lower, 1 [17%] fewer presentation). The 90% retest limits of SZEST were median 1 to 3 dB narrower and more consistent (interquartile range 2–8 dB narrower) across the dynamic range than those for FT. Conclusion: Seeding Bayesian perimetric procedures with structural measurements can reduce test variability of perimetry in glaucoma, despite imprecise structural predictions of threshold. Translational Relevance: Structural data can reduce the variability of current perimetric techniques. A strong structure–function relationship is not necessary, however, structure must predict function within ±9 dB for gains to be realized. PMID:24049720

  13. Eliciting hyperparameters of prior distributions for the parameters of paired comparison models

    Directory of Open Access Journals (Sweden)

    Nasir Abbas

    2013-02-01

    Full Text Available Normal 0 false false false EN-US X-NONE AR-SA In the study of paired comparisons (PC, items may be ranked or issues may be prioritized through subjective assessment of certain judges. PC models are developed and then used to serve the purpose of ranking. The PC models may be studied through classical or Bayesian approach. Bayesian inference is a modern statistical technique used to draw conclusions about the population parameters. Its beauty lies in incorporating prior information about the parameters into the analysis in addition to current information (i.e. data. The prior and current information are formally combined to yield a posterior distribution about the population parameters, which is the work bench of the Bayesian statisticians. However, the problems the Bayesians face correspond to the selection and formal utilization of prior distribution. Once the type of prior distribution is decided to be used, the problem of estimating the parameters of the prior distribution (i.e. elicitation still persists. Different methods are devised to serve the purpose. In this study an attempt is made to use Minimum Chi-square (hence forth MCS for the elicitation purpose. Though it is a classical estimation technique, but is used here for the election purpose. The entire elicitation procedure is illustrated through a numerical data set.

  14. Remission of type 2 diabetes mellitus after bariatric surgery - comparison between procedures.

    Science.gov (United States)

    Fernández-Soto, María L; Martín-Leyva, Ana; González-Jiménez, Amalia; García-Rubio, Jesús; Cózar-Ibáñez, Antonio; Zamora-Camacho, Francisco J; Leyva-Martínez, María S; Jiménez-Ríos, Jose A; Escobar-Jiménez, Fernándo

    2017-01-01

    We aimed to assess the mid-term type 2 diabetes mellitus recovery patterns in morbidly obese patients by comparing some relevant physiological parameters of patients of bariatric surgery between two types of surgical procedures: mixed (roux-en-Y gastric bypass and biliopancreatic diversion) and restrictive (sleeve gastrectomy). This is a prospective and observational study of co-morbid, type 2 diabetes mellitus evolution in 49 morbidly obese patients: 37 underwent mixed surgery procedures and 12 a restrictive surgery procedure. We recorded weight, height, body mass index, and glycaemic, lipid, and nutritional blood parameters, prior to procedure, as well as six and twelve months post-operatively. In addition, we tested for differences in patient recovery and investigated predictive factors in diabetes remission. Both glycaemic and lipid profiles diminished significantly to healthy levels by 6 and 12 months post intervention. Type 2 diabetes mellitus showed remission in more than 80% of patients of both types of surgical procedures, with no difference between them. Baseline body mass index, glycated haemoglobin, and insulin intake, among others, were shown to be valuable predictors of diabetes remission one year after the intervention. The choice of the type of surgical procedure did not significantly affect the remission rate of type 2 diabetes mellitus in morbidly obese patients. (Endokrynol Pol 2017; 68 (1): 18-25).

  15. Standard test method for wear testing with a pin-on-disk apparatus

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2005-01-01

    1.1 This test method covers a laboratory procedure for determining the wear of materials during sliding using a pin-on-disk apparatus. Materials are tested in pairs under nominally non-abrasive conditions. The principal areas of experimental attention in using this type of apparatus to measure wear are described. The coefficient of friction may also be determined. 1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  16. Self-prior strategy for organ reconstruction in fluorescence molecular tomography.

    Science.gov (United States)

    Zhou, Yuan; Chen, Maomao; Su, Han; Luo, Jianwen

    2017-10-01

    The purpose of this study is to propose a strategy for organ reconstruction in fluorescence molecular tomography (FMT) without prior information from other imaging modalities, and to overcome the high cost and ionizing radiation caused by the traditional structural prior strategy. The proposed strategy is designed as an iterative architecture to solve the inverse problem of FMT. In each iteration, a short time Fourier transform (STFT) based algorithm is used to extract the self-prior information in the space-frequency energy spectrum with the assumption that the regions with higher fluorescence concentration have larger energy intensity, then the cost function of the inverse problem is modified by the self-prior information, and lastly an iterative Laplacian regularization algorithm is conducted to solve the updated inverse problem and obtains the reconstruction results. Simulations and in vivo experiments on liver reconstruction are carried out to test the performance of the self-prior strategy on organ reconstruction. The organ reconstruction results obtained by the proposed self-prior strategy are closer to the ground truth than those obtained by the iterative Tikhonov regularization (ITKR) method (traditional non-prior strategy). Significant improvements are shown in the evaluation indexes of relative locational error (RLE), relative error (RE) and contrast-to-noise ratio (CNR). The self-prior strategy improves the organ reconstruction results compared with the non-prior strategy and also overcomes the shortcomings of the traditional structural prior strategy. Various applications such as metabolic imaging and pharmacokinetic study can be aided by this strategy.

  17. Investigative procedures in thyroid cancer

    International Nuclear Information System (INIS)

    Samuel, A.M.

    1999-01-01

    One of the main objectives of the procedures is to establish the likelihood of malignancy in the thyroid gland prior to surgery and detect metastases after surgery. Thyroid imaging is discussed in the context of (a) its role in the diagnosis of the primary disease (b) in the investigation of post-operative residual disease and (c) its role in the follow-up of patients after radioiodine therapy

  18. GMS/DACS interface acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring of existing, and newly installed, instrumentation associated with the SY-101 tank Gas Monitoring Systems will be systematically evaluated by performance of this procedure. All new alarms will be verified to function at the required setpoints. The change of I/O Drop 17 to I/O Drop 13 will be checked to verify that all associated alarms and screen displays are correct. All new or changed Control Screens which provide operator interface with the Gas Monitoring Systems readouts during operations will be verified to be adequate and correct. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B ampersand K (Photo) NH 3 equipment; any new or changed Genesis screens; and I/O Drop 13

  19. 78 FR 37463 - Expedited Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe...

    Science.gov (United States)

    2013-06-21

    ... Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe Drinking Water Act... page 32570, with the table entitled ``ALTERNATIVE TESTING METHODS FOR CONTAMINANTS LISTED AT 40 CFR 141... Contaminants Listed at 40 CFR 141.25(a) SM 21st Edition SM 22nd Edition Contaminant Methodology \\1\\ \\28\\ ASTM...

  20. Pilot Testing for Feasibility in a Study of Student Retention and Attrition in Online Undergraduate Programs

    Science.gov (United States)

    Fraser, Joy; Fahlman, Dorothy; Arscott, Jane; Guillot, Isabelle

    2018-01-01

    Prior to undertaking a descriptive study on attrition and retention of students in two online undergraduate health administration and human service programs, a pilot test was conducted to assess the procedures for participant recruitment, usability of the survey questionnaire, and data collection processes. A retention model provided the…

  1. Investigation into alternative sludge conditioning prior to dewatering

    CSIR Research Space (South Africa)

    Smollen, M

    1997-01-01

    Full Text Available have proven that the mixture of char and a small quantity of polyelectrolyte (0.5 to 1kg per ton of dry solids), used as a conditioner prior to centrifugation and filtration tests, produced cake solids concentration superior to that obtained by using...

  2. The Regime of Contracts under Execution within the Insolvency Procedure

    Directory of Open Access Journals (Sweden)

    Cornelia Lefter

    2008-01-01

    Full Text Available According to the Romanian law the debtor that faces financial difficulties of a certain extent can be the object of the insolvency procedure, regulated by Law no. 85/2006 concerning the insolvency procedure. Because the insolvent debtor is no longer trustworthy to its contractual partners and cannot execute the assumed obligations, there is a risk that these contracts cease, or the services that are incumbent on contractual parties are not executed. This is why, it is very important to know within the insolvency procedure and, especially during the judicial reorganization period, what will be the treatment of contracts concluded prior to the opening of this procedure and still not executed, the so-called “contracts under execution”. Also, after clarifying the concept of contract under execution, it is important to establish who has the right to opt between their continuation, or their cancellation. On the other hand, there are presented the special rules provided by Law no. 85/2006 for some categories of contracts concluded prior to the opening of the insolvency procedure, such as: labor, lease, commission contracts, master of netting agreement or contracts concluded intuitu personae or by a debtor that is the owner of a leased building, etc.

  3. 75 FR 57555 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  4. 75 FR 57556 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  5. Standard test methods for elevated temperature tension tests of metallic materials

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 These test methods cover procedure and equipment for the determination of tensile strength, yield strength, elongation, and reduction of area of metallic materials at elevated temperatures. 1.2 Determination of modulus of elasticity and proportional limit are not included. 1.3 Tension tests under conditions of rapid heating or rapid strain rates are not included. 1.4 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  6. Forensic analysis of Salvia divinorum using multivariate statistical procedures. Part I: discrimination from related Salvia species.

    Science.gov (United States)

    Willard, Melissa A Bodnar; McGuffin, Victoria L; Smith, Ruth Waddell

    2012-01-01

    Salvia divinorum is a hallucinogenic herb that is internationally regulated. In this study, salvinorin A, the active compound in S. divinorum, was extracted from S. divinorum plant leaves using a 5-min extraction with dichloromethane. Four additional Salvia species (Salvia officinalis, Salvia guaranitica, Salvia splendens, and Salvia nemorosa) were extracted using this procedure, and all extracts were analyzed by gas chromatography-mass spectrometry. Differentiation of S. divinorum from other Salvia species was successful based on visual assessment of the resulting chromatograms. To provide a more objective comparison, the total ion chromatograms (TICs) were subjected to principal components analysis (PCA). Prior to PCA, the TICs were subjected to a series of data pretreatment procedures to minimize non-chemical sources of variance in the data set. Successful discrimination of S. divinorum from the other four Salvia species was possible based on visual assessment of the PCA scores plot. To provide a numerical assessment of the discrimination, a series of statistical procedures such as Euclidean distance measurement, hierarchical cluster analysis, Student's t tests, Wilcoxon rank-sum tests, and Pearson product moment correlation were also applied to the PCA scores. The statistical procedures were then compared to determine the advantages and disadvantages for forensic applications.

  7. Use of a two-step ultrafiltration procedure to concentrate viral hemorrhagic septicemia virus (VHSV) in seawater.

    Science.gov (United States)

    Kim, Soo-Jin; Kim, Jong-Oh; Kim, Wi-Sik; Oh, Myung-Joo

    2015-11-01

    Viral hemorrhagic septicemia virus (VHSV) has been reported to be stable in both fresh as well as seawater, suggesting that VHSV exists in natural aquatic environments and might have an effect on the wild and cultured fish. However, VHSV is below the detectable limits of laboratory tests in natural seawater. In this study, a two-step ultrafiltration (UF) procedure was used to concentration of VHSV in seawater, providing samples that were tested for infectivity by cell culture and the presence of VHSV by quantitative reverse transcriptase PCR (qRT-PCR) methods. Overall, VHSV was approximately concentrated 100-1000 times in 1, 5 and 10 L, seawater volumes respectively: from 2.81×10(6) to 6.53×10(7)/mL and 10(3.3) to 10(3.8)TCID50/mL prior to the UF procedure, to 3.78×10(8), 1.16 × 10(11), and 9.12 × 10(10)/mL after the procedure. This is the first report of concentrating VHSV using an UF method that was specifically designed for seawater samples. In addition, the two-step UF procedure appears to be compatible with viral cell culture and qRT-PCR methods. Copyright © 2015 Elsevier B.V. All rights reserved.

  8. An Application of Graphical Approach to Construct Multiple Testing Procedure in a Hypothetical Phase III Design

    Directory of Open Access Journals (Sweden)

    Naitee eTing

    2014-01-01

    Full Text Available Many multiple testing procedures (MTP have been developed in recent years. Among these new procedures, the graphical approach is flexible and easy to communicate with non-statisticians. A hypothetical Phase III clinical trial design is introduced in this manuscript to demonstrate how graphical approach can be applied in clinical product development. In this design, an active comparator is used. It is thought that this test drug under development could potentially be superior to this comparator. For comparison of efficacy, the primary endpoint is well established and widely accepted by regulatory agencies. However, an important secondary endpoint based on Phase II findings looks very promising. The target dose may have a good opportunity to deliver superiority to the comparator. Furthermore, a lower dose is included in case the target dose may demonstrate potential safety concerns. This Phase III study is designed as a non-inferiority trial with two doses, and two endpoints. This manuscript will illustrate how graphical approach is applied to this design in handling multiple testing issues.

  9. Hanford Site physical separations CERCLA treatability test plan

    International Nuclear Information System (INIS)

    1992-03-01

    This test plan describes specifications, responsibilities, and general procedures to be followed to conduct a physical separations soil treatability test in the North Process Pond of the 300-FF-1 Operable Unit at the Hanford Site, Washington. The objective of this test is to evaluate the use of physical separation systems as a means of concentrating chemical and radioactive contaminants into fine soil fractions and thereby minimizing waste volumes. If successful the technology could be applied to clean up millions of cubic meters of contaminated soils in waste sites at Hanford and other sites. It is not the intent of this test to remove contaminated materials from the fine soils. Physical separation is a simple and comparatively low cost technology to potentially achieve a significant reduction in the volume of contaminated soils. Organic contaminants are expected to be insignificant for the 300-FF-I Operable Unit test, and further removal of metals and radioactive contaminants from the fine fraction of soils will require secondary treatment such as chemical extraction, electromagnetic separation, or other technologies. Additional investigations/testing are recommended to assess the economic and technical feasibility of applying secondary treatment technologies, but are not within the scope of this test. This plan provides guidance and specifications for the treatability test to be conducted as a service contract. More detailed instructions and procedures will be provided as part of the vendors (sellers) proposal. The procedures will be approved by Westinghouse Hanford Company (Westinghouse Hanford) and finalized by the seller prior to initiating the test

  10. Source Localization by Entropic Inference and Backward Renormalization Group Priors

    Directory of Open Access Journals (Sweden)

    Nestor Caticha

    2015-04-01

    Full Text Available A systematic method of transferring information from coarser to finer resolution based on renormalization group (RG transformations is introduced. It permits building informative priors in finer scales from posteriors in coarser scales since, under some conditions, RG transformations in the space of hyperparameters can be inverted. These priors are updated using renormalized data into posteriors by Maximum Entropy. The resulting inference method, backward RG (BRG priors, is tested by doing simulations of a functional magnetic resonance imaging (fMRI experiment. Its results are compared with a Bayesian approach working in the finest available resolution. Using BRG priors sources can be partially identified even when signal to noise ratio levels are up to ~ -25dB improving vastly on the single step Bayesian approach. For low levels of noise the BRG prior is not an improvement over the single scale Bayesian method. Analysis of the histograms of hyperparameters can show how to distinguish if the method is failing, due to very high levels of noise, or if the identification of the sources is, at least partially possible.

  11. 78 FR 63410 - Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment...

    Science.gov (United States)

    2013-10-24

    ... test procedures for direct heating equipment and pool heaters established under the Energy Policy and... U.S.C. 6293(e)(2)) The current energy conservation standards for direct heating equipment and pool... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2013-BT-TP-0004] RIN 1904-AC94 Energy...

  12. Use on non-conjugate prior distributions in compound failure models. Final technical report

    International Nuclear Information System (INIS)

    Shultis, J.K.; Johnson, D.E.; Milliken, G.A.; Eckhoff, N.D.

    1981-12-01

    Several theoretical and computational techniques are presented for compound failure models in which the failure rate or failure probability for a class of components is considered to be a random variable. Both the failure-on-demand and failure-rate situation are considered. Ten different prior families are presented for describing the variation or uncertainty of the failure parameter. Methods considered for estimating values for the prior parameters from a given set of failure data are (1) matching data moments to those of the prior distribution, (2) matching data moments to those of the compound marginal distribution, and (3) the marginal maximum likelihood method. Numerical methods for computing the parameter estimators for all ten prior families are presented, as well as methods for obtaining estimates of the variances and covariance of the parameter estimators, it is shown that various confidence, probability, and tolerance intervals can be evaluated. Finally, to test the resulting failure models against the given failure data, generalized chi-squage and Kolmogorov-Smirnov goodness-of-fit tests are proposed together with a test to eliminate outliers from the failure data. Computer codes based on the results presented here have been prepared and are presented in a companion report

  13. The Effect of Prior Knowledge and Gender on Physics Achievement

    Science.gov (United States)

    Stewart, John; Henderson, Rachel

    2017-01-01

    Gender differences on the Conceptual Survey in Electricity and Magnetism (CSEM) have been extensively studied. Ten semesters (N=1621) of CSEM data is presented showing male students outperform female students on the CSEM posttest by 5 % (p qualitative in-semester test questions by 3 % (p = . 004), but no significant difference between male and female students was found on quantitative test questions. Male students enter the class with superior prior preparation in the subject and score 4 % higher on the CSEM pretest (p questions correctly (N=822), male and female differences on the CSEM and qualitative test questions cease to be significant. This suggests no intrinsic gender bias exists in the CSEM itself and that gender differences are the result of prior preparation measured by CSEM pretest score. Gender differences between male and female students increase with pretest score. Regression analyses are presented to further explore interactions between preparation, gender, and achievement.

  14. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: METSAT A1 Signal Processor (P/N: 1331670-2, S/N: F04)

    Science.gov (United States)

    Lund, D.

    1998-01-01

    This report presents a description of the tests performed, and the test data, for the A1 METSAT Signal Processor Assembly PN: 1331679-2, S/N F04. The assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive Test and Integration Procedure." The objective is to demonstrate functionality of the signal processor prior to instrument integration.

  15. Emission of biocides from treated materials: test procedures for water and air.

    Science.gov (United States)

    Schoknecht, Ute; Wegner, Robby; Horn, Wolfgang; Jann, Oliver

    2003-01-01

    Methods for the determination of biocide emissions from treated materials into water and air were developed and tested in order to support a comparative ecological assessment of biocidal products. Leaching tests, experiments with simulated rain, extraction cleaning of carpets and emission chamber tests were performed with a series of treated materials. The experiments focused on the effect of changes in the procedure as well as characteristics of the specimens and demonstrate the suitability of the proposed methods for biocides of different product types. It was demonstrated that emissions of biocides into water can be compared on the basis of leaching tests in which the emission kinetics of the active ingredients are recorded. However, the water volume per surface area and the timetable for water changes have to be defined in such tests. Functions of flux rates related to time can be well described for inorganic compounds, whereas modelling of the data is more complicated for organic substances. Emission chamber tests using 20-litre and 23-litre glass exsiccators, originally developed to study volatile organic compounds, were successfully adapted for the investigation of the emission of biocides from treated materials which are usually semi volatile organic compounds. However test parameters and the method of analysis have to be adapted to the substances to be determined. Generally, it was found that the emission curves for the semi volatile organic compounds investigated differ from those of volatile organic compounds.

  16. Implicit Priors in Galaxy Cluster Mass and Scaling Relation Determinations

    Science.gov (United States)

    Mantz, A.; Allen, S. W.

    2011-01-01

    Deriving the total masses of galaxy clusters from observations of the intracluster medium (ICM) generally requires some prior information, in addition to the assumptions of hydrostatic equilibrium and spherical symmetry. Often, this information takes the form of particular parametrized functions used to describe the cluster gas density and temperature profiles. In this paper, we investigate the implicit priors on hydrostatic masses that result from this fully parametric approach, and the implications of such priors for scaling relations formed from those masses. We show that the application of such fully parametric models of the ICM naturally imposes a prior on the slopes of the derived scaling relations, favoring the self-similar model, and argue that this prior may be influential in practice. In contrast, this bias does not exist for techniques which adopt an explicit prior on the form of the mass profile but describe the ICM non-parametrically. Constraints on the slope of the cluster mass-temperature relation in the literature show a separation based the approach employed, with the results from fully parametric ICM modeling clustering nearer the self-similar value. Given that a primary goal of scaling relation analyses is to test the self-similar model, the application of methods subject to strong, implicit priors should be avoided. Alternative methods and best practices are discussed.

  17. Gestures make memories, but what kind? Patients with impaired procedural memory display disruptions in gesture production and comprehension

    Directory of Open Access Journals (Sweden)

    Nathaniel Bloem Klooster

    2015-01-01

    Full Text Available Hand gesture, a ubiquitous feature of human interaction, facilitates communication. Gesture also facilitates new learning, benefiting speakers and listeners alike. Thus, gestures must impact cognition beyond simply supporting the expression of already-formed ideas. However, the cognitive and neural mechanisms supporting the effects of gesture on learning and memory are largely unknown. We hypothesized that gesture’s ability to drive new learning is supported by procedural memory and that procedural memory deficits will disrupt gesture production and comprehension. We tested this proposal in patients with intact declarative memory, but impaired procedural memory as a consequence of Parkinson’s disease, and healthy comparison participants with intact declarative and procedural memory. In separate experiments, we manipulated the gestures participants saw and produced in a Tower of Hanoi paradigm. In the first experiment, participants solved the task either on a physical board, requiring high arching movements to manipulate the discs from peg to peg, or on a computer, requiring only flat, sideways movements of the mouse. When explaining the task, healthy participants with intact procedural memory displayed evidence of their previous experience in their gestures, producing higher, more arching hand gestures after solving on a physical board, and smaller, flatter gestures after solving on a computer. In the second experiment, healthy participants who saw high arching hand gestures in an explanation prior to solving the task subsequently moved the mouse with significantly higher curvature than those who saw smaller, flatter gestures prior to solving the task. These patterns were absent in both gesture production and comprehension experiments in patients with procedural memory impairment. These findings suggest that the procedural memory system supports the ability of gesture to drive new learning.

  18. Satellite Infrared Radiation Measurements Prior to the Major Earthquakes

    Science.gov (United States)

    Ouzounov, Dimitar; Pulintes, S.; Bryant, N.; Taylor, Patrick; Freund, F.

    2005-01-01

    This work describes our search for a relationship between tectonic stresses and increases in mid-infrared (IR) flux as part of a possible ensemble of electromagnetic (EM) phenomena that may be related to earthquake activity. We present and &scuss observed variations in thermal transients and radiation fields prior to the earthquakes of Jan 22, 2003 Colima (M6.7) Mexico, Sept. 28 .2004 near Parkfield (M6.0) in California and Northern Sumatra (M8.5) Dec. 26,2004. Previous analysis of earthquake events has indicated the presence of an IR anomaly, where temperatures increased or did not return to its usual nighttime value. Our procedures analyze nighttime satellite data that records the general condtion of the ground after sunset. We have found from the MODIS instrument data that five days before the Colima earthquake the IR land surface nighttime temperature rose up to +4 degrees C in a 100 km radius around the epicenter. The IR transient field recorded by MODIS in the vicinity of Parkfield, also with a cloud free environment, was around +1 degree C and is significantly smaller than the IR anomaly around the Colima epicenter. Ground surface temperatures near the Parkfield epicenter four days prior to the earthquake show steady increase. However, on the night preceding the quake, a significant drop in relative humidity was indicated, process similar to those register prior to the Colima event. Recent analyses of continuous ongoing long- wavelength Earth radiation (OLR) indicate significant and anomalous variability prior to some earthquakes. The cause of these anomalies is not well understood but could be the result of a triggering by an interaction between the lithosphere-hydrosphere and atmospheric related to changes in the near surface electrical field and/or gas composition prior to the earthquake. The OLR anomaly usually covers large areas surrounding the main epicenter. We have found strong anomalies signal (two sigma) along the epicentral area signals on Dec 21

  19. 78 FR 42719 - Test Procedures for Showerheads, Faucets, Water Closets, Urinals, and Commercial Prerinse Spray...

    Science.gov (United States)

    2013-07-17

    ... flow control insert of showerheads for purposes of amending DOE test procedures. In addition, DOE... may be publicly available, such as information that is exempt from public disclosure. A link to the docket Web page can be found at www.regulations.gov . The www.regulations.gov Web page contains a link to...

  20. Pre-procedural antibiotics for endoscopic urological procedures: Initial experience in individuals with spinal cord injury and asymptomatic bacteriuria.

    Science.gov (United States)

    Chong, Julio T; Klausner, Adam P; Petrossian, Albert; Byrne, Michael D; Moore, Jewel R; Goetz, Lance L; Gater, David R; Grob, B Mayer

    2015-03-01

    The objective of this study was to compare the safety, efficacy, quality-of-life impact, and costs of a single dose or a longer course of pre-procedural antibiotics prior to elective endoscopic urological procedures in individuals with spinal cord injury and disorders (SCI/D) and asymptomatic bacteriuria. A prospective observational study. Hunter Holmes McGuire Veterans Affairs Medical Center, Richmond, Virginia, USA. Sixty persons with SCI/D and asymptomatic bacteriuria scheduled to undergo elective endoscopic urological procedures. A single pre-procedural dose of antibiotics vs. a 3-5-day course of pre-procedural antibiotics. Objective and subjective measures of health, costs, and quality of life. There were no significant differences in vital signs, leukocytosis, adverse events, and overall satisfaction in individuals who received short-course vs. long-course antibiotics. There was a significant decrease in antibiotic cost (33.1 ± 47.6 vs. 3.6 ± 6.1 US$, P = 0.01) for individuals in the short-course group. In addition, there was greater pre-procedural anxiety (18 vs. 0%, P antibiotics. SCI/D individuals with asymptomatic bacteriuria may be able to safely undergo most endoscopic urological procedures with a single dose of pre-procedural antibiotics. However, further research is required and even appropriate pre-procedural antibiotics may not prevent severe infections.