WorldWideScience

Sample records for test procedures developed

  1. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  2. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  3. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B H; Dam, J J.D. van; Delft, D R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  4. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  5. Development test procedure High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    Development testing will be performed on the water jet cleaning fixture to determine the most effective arrangement of water jet nozzles to remove contamination from the surfaces of canisters and other debris. The following debris may be stained with dye to simulate surface contaminates: Mark O, Mark I, and Mark II Fuel Storage Canisters (both stainless steel and aluminum), pipe of various size, (steel, stainless, carbon steel and aluminum). Carbon steel and stainless steel plate, channel, angle, I-beam and other surfaces, specifically based on the Scientific Ecology Group (SEG) inventory and observations of debris within the basin. Test procedure for developmental testing of High Pressure Water Jet System

  6. Developing a Cloze Procedure as a Reading Comprehension Achievement Test

    Directory of Open Access Journals (Sweden)

    I Ketut Seken

    2004-01-01

    Full Text Available The project was concerned with developing a cloze procedure as a reading comprehension achievement test. The subjects were students of the English Department of the Faculty of Letters, State University of Malang, who were halfway in the semester to complete Reading II course. The test was planned and constructed on the foundation of existing theory of cloze test construction. A review of theory concerning reading comprehension, testing reading comprehension, and cloze testing led to the construction of the test, including the decision concerning how to score the test and to interpret the scores. Using a class of 28 students, the test was tried out a week after the mid-semester test was administered by the Reading II teacher. It was found that the test is sufficienty reliable on the basis of a reliability coefficient of .79 through split-half procedure and a coefficient value of .78 by K-R 20. The test also showed high inter-section correlation. The validity of the test was viewed in terms of face, content, and construct. The test scores correlate moderately with those obtained from the mid-semester test by the teacher. Some problems are discussed and a suggestion made with regard to a possible solution to these problems.

  7. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  8. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  9. Development of an accelerated creep testing procedure for geosynthetics.

    Science.gov (United States)

    1997-09-01

    The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...

  10. Usability Testing for Developing Effective Interactive Multimedia Software: Concepts, Dimensions, and Procedures

    Directory of Open Access Journals (Sweden)

    Sung Heum Lee

    1999-04-01

    Full Text Available Usability testing is a dynamic process that can be used throughout the process of developing interactive multimedia software. The purpose of usability testing is to find problems and make recommendations to improve the utility of a product during its design and development. For developing effective interactive multimedia software, dimensions of usability testing were classified into the general categories of: learnability; performance effectiveness; flexibility; error tolerance and system integrity; and user satisfaction. In the process of usability testing, evaluation experts consider the nature of users and tasks, tradeoffs supported by the iterative design paradigm, and real world constraints to effectively evaluate and improve interactive multimedia software. Different methods address different purposes and involve a combination of user and usability testing, however, usability practitioners follow the seven general procedures of usability testing for effective multimedia development. As the knowledge about usability testing grows, evaluation experts will be able to choose more effective and efficient methods and techniques that are appropriate to their goals.

  11. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy...

  12. CEL Working procedures for WRAP 2A formulation development test

    International Nuclear Information System (INIS)

    Duchsherer, M.J.

    1994-01-01

    The WRAP 2A facility will encapsulate retrieved, stored, and newly generated contact-handled mixed low level waste (MLLW) into 55-500 gal cementitous forms. Standardized test procedures will be required to facilitate this process. Cementitous specimens will be prepared from simulated drum wastes and will be tested in the Chemical Engineering Laboratory using the laboratory operating/working procedures encorporated into this document

  13. Portal monitor evaluation and test procedure

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Rich, B.L.

    1983-10-01

    The purpose was to develop techniques and procedures to allow users to measure performance and sensitivity of portal monitors. Additionally, a methodology was developed to assist users in optimizing monitor performance. The two monitors tested utilized thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: a) background count rate and the statistical variability, b) detector efficiency at different distances, c) moving source sensitivity for various size sources and speeds, and d) false alarm rates at different background levels. A model was developed for the moving source measurements to compare the experimental data with measured results, and to test whether it is possible to adequately model the behavior of a portal monitor's response to a moving source. The model results were compared with the actual test results. A procedure for testing portal monitors is also given. 1 reference, 9 figures, 8 tables

  14. Developing Field Test Procedures for Chloride Stress Corrosion Cracking in the Arabian Gulf

    Directory of Open Access Journals (Sweden)

    Hanan Farhat

    2018-01-01

    Full Text Available Oil and gas production and petrochemical plants in the Arabian Gulf are exposed to severe environmental conditions of high temperature and humidity. This makes these plants susceptible to chloride-induced stress corrosion cracking (CSCC. The laboratory testing fails to provide the exact field environmental conditions. A cost efficient field test setup for CSCC was designed and developed for the Arabian Gulf. The setup included designing self-sustained loading devices, samples, and sample racks. The samples were exposed to a stress equivalent to 80% and 100% of their yield strength. This paper describes the developed test procedures to establish testing with high level of accuracy and repeatability. It also discusses the design aspects and the challenges that were met.

  15. Powertrain Test Procedure Development for EPA GHG Certification of Medium- and Heavy-Duty Engines and Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Chambon, Paul H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deter, Dean D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-07-01

    xiii ABSTRACT The goal of this project is to develop and evaluate powertrain test procedures that can accurately simulate real-world operating conditions, and to determine greenhouse gas (GHG) emissions of advanced medium- and heavy-duty engine and vehicle technologies. ORNL used their Vehicle System Integration Laboratory to evaluate test procedures on a stand-alone engine as well as two powertrains. Those components where subjected to various drive cycles and vehicle conditions to evaluate the validity of the results over a broad range of test conditions. Overall, more than 1000 tests were performed. The data are compiled and analyzed in this report.

  16. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  17. Development of a testing methodology for computerized procedure system based on JUnit framework and MFM

    International Nuclear Information System (INIS)

    Qin, Wei

    2004-02-01

    Paper Based Procedure (PBP) and Computerized Procedure System (CPS) are studied to demonstrate that it is necessary to develop CPS in Nuclear Power Plant (NPP) Instrumentation and Control (I and C) system. Computerized procedure system is actually a software system. All the desired and undesired properties of a software system can be described and evaluated as software qualities. Generally, software qualities can be categorized into product quality and process quality. In order to achieve product quality, the process quality of a software system should also be considered and achieved. Characteristics of CPS will be described to analyse the product and process of an example CPS: ImPRO. At the same time, several main product and process issues will be analysed from Verification and Validation (V and V) point of view. It is concluded and suggested that V and V activities can also be regarded as a software development process, this point of view then is applied to the V and V activities of ImPRO as a systematic approach of testing of ImPRO. To support and realize this approach, suitable testing technologies and testing strategies are suggested based on JUnit framework and Multi-level Flow Modeling (MFM)

  18. A FLOW-THROUGH TESTING PROCEDURE WITH DUCKWEED (LEMNA MINOR L.)

    Science.gov (United States)

    Lemna minor is one of the smallest flowering plants. Because of its floating habit, ease of culture, and small size it is well adapted for laboratory investigations. Procedures for flow-through tests were developed. Testing procedures were developed with this apparatus. By using ...

  19. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  20. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  1. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  2. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  3. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  4. Automation of the testing procedure

    International Nuclear Information System (INIS)

    Haas, H.; Fleischer, M.; Bachner, E.

    1979-01-01

    For the judgement of technologies applied and the testing of specific components of the HTR primary circuit, complex test procedures and data evaluations are required. Extensive automation of these test procedures is indispensable. (orig.) [de

  5. Developing standard performance testing procedures for MC and A components at a site

    International Nuclear Information System (INIS)

    Scherer, Carolynn

    2010-01-01

    The condition of a nuclear material control and accountability system (MC and A) and its individual components, as with any system combining technical elements, documentation and the human factor, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC and A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following elements and subsystems or components for a material control and accountability system: (1) MC and A Elements: Information subsystem, Measurement subsystem, NM access subsystem, including a tamper-indicating device (TID) program, and Automated information-gathering subsystem; and (2) Detecting NM Loses Elements: Inventory differences, Shipper/receiver differences, Confirmatory measurements and differences with accounting data, and TID or seal violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems (from the list above). Additionally this work includes a review of the status of regulatory requirements for the MC and A system components and potential criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC and A performance-testing procedures were the basis for a pilot Guide for MC and A Performance Testing at the MBAs of SSC RF IPPE.

  6. The Case for Laboratory Developed Procedures

    Directory of Open Access Journals (Sweden)

    Karen L. Kaul MD, PhD

    2017-07-01

    Full Text Available An explosion of knowledge and technology is revolutionizing medicine and patient care. Novel testing must be brought to the clinic with safety and accuracy, but also in a timely and cost-effective manner, so that patients can benefit and laboratories can offer testing consistent with current guidelines. Under the oversight provided by the Clinical Laboratory Improvement Amendments, laboratories have been able to develop and optimize laboratory procedures for use in-house. Quality improvement programs, interlaboratory comparisons, and the ability of laboratories to adjust assays as needed to improve results, utilize new sample types, or incorporate new mutations, information, or technologies are positive aspects of Clinical Laboratory Improvement Amendments oversight of laboratory-developed procedures. Laboratories have a long history of successful service to patients operating under Clinical Laboratory Improvement Amendments. A series of detailed clinical examples illustrating the quality and positive impact of laboratory-developed procedures on patient care is provided. These examples also demonstrate how Clinical Laboratory Improvement Amendments oversight ensures accurate, reliable, and reproducible testing in clinical laboratories.

  7. Development of the testing procedure for units and elements of mining equipment

    Directory of Open Access Journals (Sweden)

    P. B. Gerike

    2017-09-01

    Full Text Available The author considers in detail the stages of creating a testing procedure for mining equipment based on the complex implementation of principles of nondestructive testing and technical diagnostics. The author substantiates effectiveness of application of a complex diagnostic approach for assessing the state of metal structures and energy-mechanical equipment of mining machines. The opportunity for timely detection of defects, regardless of their type and degree of danger, presents itself only with a wide application of the modern methods of vibration diagnostics and nondestructive testing. The author substantiates the effectiveness of specific combination of methods of nondestructive testing, most optimally suited for solving given tasks. The article contains the developed complex of more than 120 diagnostic rules, suitable for performing automated analysis of vibroacoustic signal and revealing the main damages of energy-mechanical equipment based on selective groups of informative frequencies. The author formulates the main criteria that one can use as a basic platform for improving the methodology for normalizing the parameters of mechanical oscillations. The developed diagnostic criteria became a basis for the development of individual spectral masks suitable for performing the analysis of parameters of vibroacoustic waves generated during operation of mining equipment. The author proves necessity of transition of repair and maintenance divisions of industrial enterprises to the system of maintenance of machinery according to its actual technical state, and the developed complex of diagnostic rules for detecting defects can serve as a platform for the implementation of basic elements of this system. The author substantiates the principal validity of the developed methodology for testing mining machines equipment and its individual elements, such as the predictive modeling of degradation of technical state of mining equipment and the

  8. Toddler test or procedure preparation

    Science.gov (United States)

    ... a test or procedure: Explain the procedure in language your child understands, using plain words. Avoid abstract terms. Make sure your child understands the exact body part involved in the test, and that the ...

  9. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  10. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  11. Testing of tubular goods - a critical review of past and actual testing procedures

    Energy Technology Data Exchange (ETDEWEB)

    Teodoriu, C. [Texas A and M Univ., Houston, TX (United States); Holzmann, J.; Klaws, M. [TU Clausthal (Germany). Inst. fuer Erdoel- und Erdgastechnik

    2007-09-13

    Testing of oil country tubular goods (OCTG) is based on standards and offers the user a comparison platform between products of different manufacturers. But, do the standard based testing procedures assume the real loads on OCTG? More likely, the existing standards or recommendations on tubular testing have been evolving together with the new demands on OCTG loading. Since nowadays the oil and gas industry is looking to develop extreme reservoir types (deep water, HP/HT), there is a need of a better understanding and continuous improvement of testing procedures. The following poster proposes an analysis of existing procedures to test tubular goods and then will focus on the future demands on OCTG testing. New loads, as casing fatigue, will be discussed and analyzed based on the authors experience gained during more than 8 years of testing tubular goods at the Clausthal University of Technology, Institute of Petroleum Engineering. (orig.)

  12. Quality assurance of radiopharmaceuticals-specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Pojer, P.M.

    1981-08-01

    This report is a compilation of test methods used and specifications adopted for the Radiopharmaceutical Quality Assurance Test Programme conducted by the Australian Radiation Laboratory. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods have been developed at the ARL

  13. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  14. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  15. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  16. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  17. 702AZ aging waste ventilation facility year 2000 test procedure

    International Nuclear Information System (INIS)

    Winkelman, W.D.

    1998-01-01

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure

  18. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  19. Development of a Laboratory Test Procedure to Evaluate Tack Coat Performance

    OpenAIRE

    YILDIRIM, Yetkin; SMIT, André de Fortier; KORKMAZ, Armagan

    2014-01-01

    A laboratory testing procedure is presented, the results of which may be used for determining the best combination of tack coat type, mixture type, and application rate to be applied in the field for optimum performance. Tack coat related performance results were determined from Hamburg wheel tracking and simple shear tests on laboratory prepared specimens. This study was undertaken to evaluate the shear strength performance of tack coats under laboratory-controlled conditions. The ...

  20. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  1. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  2. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  3. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  4. Developing standard performance testing procedures for material control and accounting components at a site

    International Nuclear Information System (INIS)

    Scherer, Carolynn P.; Bushlya, Anatoly V.; Efimenko, Vladimir F.; Ilyanstev, Anatoly; Regoushevsky, Victor I.

    2010-01-01

    The condition of a nuclear material control and accountability system (MC and A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC and A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC and A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC and A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC and A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC and A performance-testing procedures were the basis for a Guide for MC and A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  5. Development, test and evaluation of a computerized procedure for using Landsat data to estimate spring small grains acreage

    Science.gov (United States)

    Mohler, R. R. J.; Palmer, W. F.; Smyrski, M. M.; Baker, T. C.; Nazare, C. V.

    1982-01-01

    A number of methods which can provide information concerning crop acreages on the basis of a utilization of multispectral scanner (MSS) data require for their implementation a comparatively large amount of labor. The present investigation is concerned with a project designed to improve the efficiency of analysis through increased automation. The Caesar technique was developed to realize this objective. The processability rates of the Caesar procedure versus the historical state-of-the-art proportion estimation procedures were determined in an experiment. Attention is given to the study site, the aggregation technology, the results of the aggregation test, and questions of error characterization. It is found that the Caesar procedure, which has been developed for the spring small grains region of North America, is highly efficient and provides accurate results.

  6. The influence of different measurement structures on NRTA test procedures

    International Nuclear Information System (INIS)

    Beedgen, R.

    1986-01-01

    The development of sequential statistical test procedures in the area of near real time material accountancy (NRTA) mostly assumed a fixed measurement model of a given model facility. In this paper different measurement models (dispersion matrices) for a sequence of balance periods are studied. They are used to compare the detection probabilities of three different sequential test procedures for losses of material. It is shown how different plant models have an influence on the sensitivity of specified tests. Great importance for that analysis have the optimal loss patterns in each measurement situation

  7. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  8. Dispersant testing : a study on analytical test procedures

    International Nuclear Information System (INIS)

    Fingas, M.F.; Fieldhouse, B.; Wang, Z.; Environment Canada, Ottawa, ON

    2004-01-01

    Crude oil is a complex mixture of hydrocarbons, ranging from small, volatile compounds to very large, non-volatile compounds. Analysis of the dispersed oil is crucial. This paper described Environment Canada's ongoing studies on various traits of dispersants. In particular, it describes small studies related to dispersant effectiveness and methods to improve analytical procedures. The study also re-evaluated the analytical procedure for the Swirling Flask Test, which is now part of the ASTM standard procedure. There are new and improved methods for analyzing oil-in-water using gas chromatography (GC). The methods could be further enhanced by integrating the entire chromatogram rather than just peaks. This would result in a decrease in maximum variation from 5 per cent to about 2 per cent. For oil-dispersant studies, the surfactant-dispersed oil hydrocarbons consist of two parts: GC-resolved hydrocarbons and GC-unresolved hydrocarbons. This study also tested a second feature of the Swirling Flask Test in which the side spout was tested and compared with a new vessel with a septum port instead of a side spout. This decreased the variability as well as the energy and mixing in the vessel. Rather than being a variation of the Swirling Flask Test, it was suggested that a spoutless vessel might be considered as a completely separate test. 7 refs., 2 tabs., 4 figs

  9. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  10. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  11. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  12. Analysis and optimization of blood-testing procedures.

    NARCIS (Netherlands)

    Bar-Lev, S.K.; Boxma, O.J.; Perry, D.; Vastazos, L.P.

    2017-01-01

    This paper is devoted to the performance analysis and optimization of blood testing procedures. We present a queueing model of two queues in series, representing the two stages of a blood-testing procedure. Service (testing) in stage 1 is performed in batches, whereas it is done individually in

  13. DOT-7A packaging test procedure

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1995-01-01

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes

  14. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  15. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  16. Vehicle accelerated corrosion test procedures for automotive in Malaysia

    Directory of Open Access Journals (Sweden)

    Anuar Liza

    2017-01-01

    Full Text Available An accelerated corrosion test, known as proving ground accelerated test, is commonly performed by automotive manufacturers to evaluate the corrosion performance of a vehicle. The test combines corrosion and durability inputs to detect potential failures that may occur during in-service conditions. Currently, the test is conducted at an external test center overseas. Such test is aimed to simulate the effects of one year accelerated corrosion in severe corrosive environment of the north-east and south east of America. However, the test results obtained do not correlate with the actual corrosion conditions observed in the Malaysian market, which is likely attributed to the different test environment of the tropical climate of vehicles in service. Therefore, a vehicle accelerated corrosion test procedure that suits the Malaysian market is proposed and benchmarked with other global car manufacturers that have their own dedicated corrosion test procedure. In the present work, a test track is used as the corrosion test ground and consists of various types of roads for structural durability exposures. Corrosion related facilities like salt trough, mud trough and gravel road are constructed as addition to the existing facilities. The establishment of accelerated corrosion test facilities has contributed to the development of initial accelerated corrosion test procedure for the national car manufacturer. The corrosion exposure is monitored by fitting test coupons at the underbody of test vehicle using mass loss technique so that the desired corrosion rate capable of simulating the real time corrosion effects for its target market.

  17. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  18. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  19. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    that need to be attained for successful characterization of the planned demonstrators and it deals with the material characterization and prototype testing for the COTECH demonstrators. The summary of this report includes:  General description of COTECH industrial demonstrators  COTECH materials...... and material characterization techniques  Characterization techniques of the COTECH demonstrators  Functionality and lifecycle testing of the COTECH demonstrators Besides the general introduction and conclusion each section of the report is dedicated to the characterization techniques and test procedure.......Characterization techniques and test procedure requirements for innovative self-ligating dental brackets (EO) Section 5.Characterization techniques and test procedure requirements for smart diagnostic chips comprising a microfluidic channel system (GBO) Section 6.Characterization techniques and test procedure...

  20. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  1. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  2. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  3. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  4. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  5. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  6. Specifications and test procedures for airline-type supplied-air suits

    International Nuclear Information System (INIS)

    Revoir, W.H.; Pritchard, J.A.; Davis, T.O.; Richards, C.P.; Wheat, L.D.

    1975-05-01

    Procedures and requirements have been established to permit airline-type supplied-air suits needed by contractors of the Energy Research and Development Administration to be tested for performance by the Respirator Research and Development Section, Industrial Hygiene Group, of the Los Alamos Scientific Laboratory, and to have the adequacy of the performance of these devices evaluated by the Los Alamos Scientific Laboratory Respirator Advisory Committee. Test equipment, test methods, and performance criteria for airline-type supplied-air suits are prescribed. (U.S.)

  7. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  8. 40 CFR 53.23 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... deviation about the mean and is expressed in concentration units. (2) Test procedure. (i) Allow sufficient... definition. Positive or negative response caused by a substance other than the one being measured. (2) Test...) Before testing for each interferent, allow the test analyzer to sample through the scrubber a test...

  9. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  10. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    Science.gov (United States)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  11. 118-B-1 excavation treatability test procedures

    International Nuclear Information System (INIS)

    Frain, J.M.

    1994-01-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel

  12. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  13. Testing taste sensitivity and aversion in very young children : development of a procedure

    NARCIS (Netherlands)

    Visser, J; Kroeze, J.H.A.; Kamps, WA; Bijleveld, CMA

    Taste perception in 45 3- to 6-year-old children was tested using procedures specifically designed for this age group. Detection thresholds for sucrose and urea were measured by a staircase method and aversion to urea was assessed hedonically, using drawings of facial expressions. All children

  14. Procedure on the Impact Characteristic Test for the One-sided and Thru-grid Spacer Grid

    International Nuclear Information System (INIS)

    Yoon, Kyung Ho; Kim, Jae Yong; Lee, Kang Hee; Song, Kee Nam

    2006-09-01

    In order to perform the one-sided and the through-grid impact tests for a new developed spacer grid, the drop type impact test machines were established. The dynamic impact test is to get some basic data for accident analysis such as impact strength, stiffness, and coefficient of the restitution. Furthermore, these developed test methods and procedures will be qualified standard for increasing the reliability of the test results. Chapter 2 provides an introduction to the test facilities and instrumentations. Chapter 3 describes on how spacer grid and the single span fuel assembly specimen will be prepared. In addition to this, how to set up these testing machines. Chapter 4 illustrates detail test procedure on how to acquire impact signal of the two kinds of the specimen. Chapter 5 deals with signal processing and analysis for the test data. Finally, chapter 6 summarise the overall test procedure and the test method

  15. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  16. Cloud-based Electronic Test Procedures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Test procedures are at the heart of any experimental process, especially those involving novel and complex hardware. Whether these procedures are for system...

  17. New test procedure to determine fuel's knock resistance; Neues Kraftstoffpruefverfahren zur Bestimmung der Klopffestigkeit

    Energy Technology Data Exchange (ETDEWEB)

    Huber, Karl [Hochschule Ingolstadt (Germany). Thermodynamik und Verbrennungsmotoren; Hauber, Johann; Raba, Andreas [Hochschule Ingolstadt (Germany). Inst. fuer Angewandte Forschung; Nell, Robert [Rofa Laboratory and Process Analyzers, Kritzendorf (Austria). Bereich Produktentwicklung

    2013-07-15

    Knock resistance is one of the most important quality features of gasoline that is determined by standardised motor test procedures. These procedures were developed more than 80 years ago and have been used nearly unchanged since then. During a four-year research project at Ingolstadt University of Applied Sciences, the procedures for determination of octane numbers were analysed in order to develop a new engine-based test method. (orig.)

  18. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  19. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  20. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  1. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  2. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  3. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  4. Quality assurance of radiopharmaceuticals - specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Colmanet, S.F.; Ivanov, Z.; Lauder, R.A.

    1990-10-01

    The authors report on a Radiopharmaceutical Quality Assurance Test Programme carried out by the Australian Radiation Laboratory in which radiopharmaceuticals used in nuclear medicine in Australia are tested for compliance with specifications. Where the radiopharmaceutical is the subject of a monograph in the British Pharmacopoeia or the European Pharmacopoeia, then the specifications given in the Pharmacopoeia are adopted. In other cases the specifications given have been adopted by this Laboratory and have no legal status. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods described have been developed at this Laboratory. It should be noted that, unless stated otherwise, specifications listed apply at all times up until product expire

  5. Adolescent test or procedure preparation

    Science.gov (United States)

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older teens may benefit from videos that show adolescents of the same age explaining ...

  6. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  7. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  8. Development of an automated desktop procedure for defining macro ...

    African Journals Online (AJOL)

    2006-07-03

    break points' such as ... An automated desktop procedure was developed for computing statistically defensible, multiple change .... from source to mouth. .... the calculated value was less than the test statistic given in Owen.

  9. Considerations for the selection of an applicable energy efficiency test procedure for electric motors in Malaysia: Lessons for other developing countries

    International Nuclear Information System (INIS)

    Yanti, P.A.A.; Mahlia, T.M.I.

    2009-01-01

    Electric motors are a major energy-consuming appliance in the industrial sector. According to a survey, electric motors account for more than 70% of the total growth from 1991 to 2004 in electricity consumption in this sector in Malaysia. To reduce electricity consumption, Malaysia should consider resetting the minimum energy efficiency standards for electric motors sometime in the coming year. The first step towards adopting energy efficiency standards is the creation of a procedure for testing and rating equipment. An energy test procedure is the technical foundation for all energy efficiency standards, energy labels and other related programs. The test conditions in the test procedure must represent the conditions of the country. This paper presents the process for the selection of an energy test procedure for electric motors in Malaysia based on the country's conditions and requirements. The adoption of test procedures for electric motors internationally by several countries is also discussed in this paper. Even though the paper only discusses the test procedure for electric motors in Malaysia, the methods can be directly applied in other countries without major modifications.

  10. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs

  11. Safety panel and new procedures evaluation by simulator tests

    International Nuclear Information System (INIS)

    Meslin, T.

    1986-01-01

    With more than thirty weeks of simulator testing (for the last three years only) and approximately three hundred scenarios, EDF's experience in this field is extensive. This practice is well known within Fossil and Nuclear Generation and is well accepted by the operating teams which participate in it. Simulator testing appears to be an essential decision-making tool in the process of developing new operating aids in PWR plants. Accelerated development and the elimination of long and expensive modifications after commissioning is an economic advantage. The saving in time is obvious, since modifications are carried out continuously throughout the development phase. Finally, operators participate in the development of systems and receive fixed, well-defined applications. This practice has become systematic, and all new applications concerning the operation of PWR plants are simulator-tested, particularly 1300-MW unit computers and operating procedures, the new generation of 900-MW unit computers, and the new 1500-MW fully computerized control rooms. Finally, this simulator testing allows us to considerably increase our knowledge concerning the behavior of operators in accident situations, and special tests are performed for this purpose

  12. 16 CFR 1510.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedure. 1510.4 Section 1510.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS... plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  13. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs

  14. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  15. [Procedure of seed quality testing and seed grading standard of Prunus humilis].

    Science.gov (United States)

    Wen, Hao; Ren, Guang-Xi; Gao, Ya; Luo, Jun; Liu, Chun-Sheng; Li, Wei-Dong

    2014-11-01

    So far there exists no corresponding quality test procedures and grading standards for the seed of Prunus humilis, which is one of the important source of base of semen pruni. Therefor we set up test procedures that are adapt to characteristics of the P. humilis seed through the study of the test of sampling, seed purity, thousand-grain weight, seed moisture, seed viability and germination percentage. 50 cases of seed specimens of P. humilis tested. The related data were analyzed by cluster analysis. Through this research, the seed quality test procedure was developed, and the seed quality grading standard was formulated. The seed quality of each grade should meet the following requirements: for first grade seeds, germination percentage ≥ 68%, thousand-grain weight 383 g, purity ≥ 93%, seed moisture ≤ 5%; for second grade seeds, germination percentage ≥ 26%, thousand-grain weight ≥ 266 g, purity ≥ 73%, seed moisture ≤9%; for third grade seeds, germination percentage ≥ 10%, purity ≥ 50%, thousand-grain weight ≥ 08 g, seed moisture ≤ 13%.

  16. ASK Procedure for Instrumented Pre-cracked Charpy-Type Tests

    International Nuclear Information System (INIS)

    Varga, T.; Njo, D.H.; Prantl, G.

    1981-01-01

    The essential technical content of the ASK procedure originated from development work in Switzerland since 1963, and practical experiences gained since 1972. The remainder of the content and the format of the procedure are based on the ASTM E 24.03.03. (Tentative Draft Copy) 'Proposed Method for Pre-cracked Charpy Impact and Slow-Bend Testing of Metallic Materials' by C. E. Harbower, 1973. Two different velocities, 5 m/s and 0.1 m/s were used with a Schnadt-type machine of rigid construction. The stiffness of the machine proved to be very suitable for instrumented testing. The instrumented Schnadt-Type machine was equipped with strain gauges both on the top of the pendulum and on the chisel. A static force calibration was followed by energy calibration, comparing potential energy losses with the area under the force-deflection curve. Deflection was measured using a high frequency eddy current method on the pendulum, and for slow testing by means of an inductive gauge on the chisel. Charpy-Type specimens of 1.0 mm max notch depth and 0.12 mm max notch radius were pre-cracked using a resonant fatigue testing machine, or an eccentric drive machine. Crack propagation rate da/dN was measured using 'Russenberger' measuring gauges. In addition a new technique for the detection of dynamic crack initiation, developed at the Institute of Research and Technology (TVFA) in Vienna is discussed and some results presented

  17. Procedure Development and Qualification of the Phased Array Ultrasonic Testing for the Nuclear Power Plant Piping Weld

    International Nuclear Information System (INIS)

    Yoon, Byung Sik; Yang, Seung Han; Kim, Yong Sik; Lee, Hee Jong

    2010-01-01

    The manual ultrasonic examination for the nuclear power plant piping welds has been demonstrated by using KPD(Korean Performance Demonstration) generic procedure. For automated ultrasonic examination, there is no generic procedure and it should be qualified by using applicable automated equipment. Until now, most of qualified procedures used pulse-echo technique and there is no qualified procedure using phased array technique. In this study, data acquisition and analysis software were developed and phased-array transducer and wedge were designed to implement phased array technique for nuclear power plant in-service inspection. The developed procedure are qualified for performance demonstration for the flaw detection, length sizing and depth sizing. The qualified procedure will be applied for the field examination in the nuclear power plant piping weld inspection

  18. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  19. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  20. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  1. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  2. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  3. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  4. Interdisciplinary Development of an Improved Emergency Department Procedural Work Surface Through Iterative Design and Use Testing in Simulated and Clinical Environments.

    Science.gov (United States)

    Zhang, Xiao C; Bermudez, Ana M; Reddy, Pranav M; Sarpatwari, Ravi R; Chheng, Darin B; Mezoian, Taylor J; Schwartz, Victoria R; Simmons, Quinneil J; Jay, Gregory D; Kobayashi, Leo

    2017-03-01

    A stable and readily accessible work surface for bedside medical procedures represents a valuable tool for acute care providers. In emergency department (ED) settings, the design and implementation of traditional Mayo stands and related surface devices often limit their availability, portability, and usability, which can lead to suboptimal clinical practice conditions that may affect the safe and effective performance of medical procedures and delivery of patient care. We designed and built a novel, open-source, portable, bedside procedural surface through an iterative development process with use testing in simulated and live clinical environments. The procedural surface development project was conducted between October 2014 and June 2016 at an academic referral hospital and its affiliated simulation facility. An interdisciplinary team of emergency physicians, mechanical engineers, medical students, and design students sought to construct a prototype bedside procedural surface out of off-the-shelf hardware during a collaborative university course on health care design. After determination of end-user needs and core design requirements, multiple prototypes were fabricated and iteratively modified, with early variants featuring undermattress stabilizing supports or ratcheting clamp mechanisms. Versions 1 through 4 underwent 2 hands-on usability-testing simulation sessions; version 5 was presented at a design critique held jointly by a panel of clinical and industrial design faculty for expert feedback. Responding to select feedback elements over several surface versions, investigators arrived at a near-final prototype design for fabrication and use testing in a live clinical setting. This experimental procedural surface (version 8) was constructed and then deployed for controlled usability testing against the standard Mayo stands in use at the study site ED. Clinical providers working in the ED who opted to participate in the study were provided with the prototype

  5. Developing, adopting and adapting operating procedures

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture specifies all the dispositions which have been taken by EDF Nuclear and Fossil Generation Department - according to the fact that availability and safety largely depend on the quality of the procedures and their easy handling - in order to develop, adopt and adapt the operating procedures. The following points are treated: General organization of procedures for plant operation during normal and abnormal conditions; Personnel and extend of responsibility involved into the development of procedures (research center, training center, specialized services, nuclear station, etc.); Validation of the procedures by means of full-scope simulators; Modifications of the procedures taking into account operation experience in material and human fields; Development of simulation softs in order to perform the procedures in abnormal situations; Evolution of operating technics and future skills. (orig.)

  6. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  7. Mollusc reproductive toxicity tests - Development and validation of test guidelines

    DEFF Research Database (Denmark)

    Ducrot, Virginie; Holbech, Henrik; Kinnberg, Karin Lund

    . Draft standard operating procedures (SOPs) have been designed based upon literature and expert knowledge from project partners. Pre-validation studies have been implemented to validate the proposed test conditions and identify issues in performing the SOPs and analyzing test results. Pre-validation work......The Organisation for Economic Cooperation and Development is promoting the development and validation of mollusc toxicity tests within its test guidelines programme, eventually aiming for the standardization of mollusc apical toxicity tests. Through collaborative work between academia, industry...... and stakeholders, this study aims to develop innovative partial life-cycle tests on the reproduction of the freshwater gastropods Potamopyrgus antipodarum and Lymnaea stagnalis, which are relevant candidate species for the standardization of mollusc apical toxicity tests assessing reprotoxic effects of chemicals...

  8. Test procedure forms for sludge retrieval and packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides test procedure forms for sludge retrieval and packaging tests in the 305 Cold Test Facility. The completed and approved forms provide all descriptions, criteria and analysis to safely perform sludge equipment tests in the 305 Cold Test Facility

  9. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  10. Specifications for Testing Procedures at Svåheia

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Kofoed, Jens Peter

    This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance.......This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance....

  11. A simplified test procedure for determining the effectiveness of adsorbents for the removal of methyl iodide

    International Nuclear Information System (INIS)

    Underhill, D.W.

    1993-01-01

    ASTM Test Procedure D3803 measures the ability of nuclear-grade carbon to remove methyl iodide from a stream of humidified air. This test, unlike all the other procedures developed by ASTM Committee D28, has evolved to become extremely complex. The intricacy of this test as well as the great difficulty in obtaining inter-laboratory agreement, creates doubt as tot the actual meaning of the results. Here a far simpler test system is described in which thermodynamic principles are used to maintain a constant, reproducible test procedure. This paper describes a system implementing these elements, its cost to build, and the factors affecting its accuracy. 11 refs., 1 fig

  12. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  13. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... procedures for electric motors to allow currently unregulated motors to be tested by clarifying the test...

  14. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  15. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  16. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  17. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  18. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  19. Development and verification of symptom based emergency procedure support system

    International Nuclear Information System (INIS)

    Saijou, Nobuyuki; Sakuma, Akira; Takizawa, Yoji; Tamagawa, Naoko; Kubota, Ryuji; Satou, Hiroyuki; Ikeda, Koji; Taminami, Tatsuya

    1998-01-01

    A Computerized Emergency Procedure Guideline (EPG) Support System has been developed for BWR and evaluated using training simulator. It aims to enhance the effective utilization of EPG. The system identifies suitable symptom-based operating procedures for present plant status automatically. It has two functions : one is plant status identification function, and the other is man-machine interface function. For the realization of the former function, a method which identifies and prioritize suitable symptom-based operational procedures against present plant status has been developed. As man-machine interface, operation flow chart display has been developed. It express the flow of the identified operating procedures graphically. For easy understanding of the display, important information such as plant status change, priority of operating procedures and completion/uncompletion of the operation is displayed on the operation flow display by different colors. As evaluation test, the response of the system to the design based accidents was evaluated by actual plant operators, using training simulator at BWR Training Center. Through the analysis of interviews and questionnaires to operators, it was shown that the system is effective and can be utilized for a real plant. (author)

  20. Development to requirements for a procedures software tool

    International Nuclear Information System (INIS)

    Yasutake, J.Y.; Hachiro Isoda

    1993-01-01

    In 1989, the Electric Power Research Institute (EPRI) and the Central Research Institute of the Electric Power Industry (CRIEPI) in Japan initiated a joint research program to investigate various interventions to reduce personnel errors and inefficiencies in the maintenance of nuclear power plants. This program, consisting of several interrelated projects, was initiated because of the mutual recognition of the importance of the human element in the efficient and safe operation of utilities and the continuing need to enhance personnel performance to sustain plant safety and availability. This paper summarizes one of the projects, jointly funded by EPRI and CRIEPI, to analyze the requirements for, and prepare a functional description of, a procedures software tool (PST). The primary objective of this project was to develop a description of the features and functions of a software tool that would help procedure writers to improve the quality of maintenance and testing procedures, thereby enhancing the performance of both procedure writers and maintenance personnel

  1. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    DEFF Research Database (Denmark)

    Hunter, R.; Friis Pedersen, Troels; Dunbabin, P.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard forwind turbine power performance testing....... The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project itdescribes, has been designed to help provide a solid technical foundation for this revised...... standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support offundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle...

  2. Procedure for vibration test of the fuel rod supported by spacer grids

    International Nuclear Information System (INIS)

    Choi, Myoung Hwan; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Song, Kee Nam

    2002-07-01

    One of the methods that are used to compare and verify the supporting performance of the spacer grids developed is the vibration characteristic test. In this report there are two aims. One is of the understand of the experimental method and procedure performing the modal testing using I-DEAS TDAS module. The other is the investigation of the vibration behaviors of a dummy fuel rod supported by 8 optimized H type spacer grids. This report describes the method and procedure of modal testing to obtain the vibration characteristics such as amplitudes, natural frequencies and mode shapes of the fuel rod using a shaker, a non-contact gap sensor and an accelerometer. This report provides a test procedure in detail so that anyone can be easily understood and use the I-DEAS TDAS program. The I-DEAS TDAS program related to the modal testing has several tasks including the Modal analysis, Signal Processing et al.. This report includes model preparation to prepare the geometrical model, Signal Processing (Sine/Standard measurement) to acquire the signal, Modal analysis to obtain the frequencies and mode shapes, Correlation to analyze the relation between the test and FE analysis and Post Processing tasks. In addition, this report contains the actual test and analysis data of a dummy fuel rod in length 3847mm supported by 8 optimized H type spacer grids

  3. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  4. Development and Validation of a Translation Test.

    Science.gov (United States)

    Ghonsooly, Behzad

    1993-01-01

    Translation testing methodology has been criticized for its subjective character. No real strides have so far been made in developing an objective translation test. In this paper, certain detailed procedures including various phases of pretesting have been performed to achieve objectivity and scorability in translation testing methodology. In…

  5. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  6. Development of quantitative evaluation procedure of in-service materials degradation

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1992-01-01

    The quantitative nondestructive evaluation procedure for detecting in-service materials degradation of low alloy structural steels by both small punch test and the electrochemical method has been developed. The static and dynamic small punch test method have been developed in order to apply this technique to R and D study for fusion reactor material development, such as 14 MeV irradiation damage evaluation. The characteristic changes in polarization curves attributed to IGC have an excellent correlation with shifts in FATT caused by temper embrittlement for Cr-Mo and Cr-Mo-V steels. (author)

  7. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  8. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  9. Operatibility test procedure for the Waste Information and Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the operability test procedure for the WICS. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  10. Initial land reclamation procedures related to possible Pu-cleanup activities at the Tonopah Test Range

    International Nuclear Information System (INIS)

    Wallace, A.; Romney, E.M.

    1976-02-01

    If areas of the Tonopah Test Range (TTR) are to be used for experimental tests of procedures for clean-up of 239 Pu contamination, there are experiences in the Great Basin Desert portions of the Nevada Test Site (NTS) which can serve as guides to reclamation and revegetation of such arid lands. Procedures which will encourage development of the grasses Hilaria jamesii and Oryzopsis hymenoides, as well as the perennial shrubs Eurotia lanata and Atriplex canescens would greatly improve the area as range land

  11. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  12. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  13. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  14. Development of experimental method for self-wastage behavior in sodium-water reaction. Development of test rig (SWAT-2R) and study for experimental procedure

    International Nuclear Information System (INIS)

    Abe, Yuta; Shimoyama, Kazuhito; Kurihara, Akikazu

    2014-07-01

    In case of water leak from a penetrated crack on a tube of steam generator in the sodium cooled fast reactor (SFR), self-wastage, that increases the size of leak, may take place by corrosion related to chemical reaction between sodium and water. If the self-wastage continues in a certain period of time, the intact tube bundle may be damaged as a result of enlarged leak. For the safety evaluation of the accident, JAEA has been developing the analytical method of self-wastage using the multi-dimensional sodium-water reaction code. Experiments conducted so far used mainly crack-type test pieces. However, reproducibility was limited and it was difficult to evaluate individual effects of the phenomena in detail. This report describes the development of new experimental rig (SWAT-2R). SWAT-2R enables to examine corrosion effecting factors that were ambiguous in the previous studies. The report includes description of development of micro-leak test piece, examination of experimental procedure. The results will provide fundamental data for validation of the self-wastage analytical method. (author)

  15. Health Code Number (HCN) Development Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Petrocchi, Rocky; Craig, Douglas K.; Bond, Jayne-Anne; Trott, Donna M.; Yu, Xiao-Ying

    2013-09-01

    This report provides the detailed description of health code numbers (HCNs) and the procedure of how each HCN is assigned. It contains many guidelines and rationales of HCNs. HCNs are used in the chemical mixture methodology (CMM), a method recommended by the department of energy (DOE) for assessing health effects as a result of exposures to airborne aerosols in an emergency. The procedure is a useful tool for proficient HCN code developers. Intense training and quality assurance with qualified HCN developers are required before an individual comprehends the procedure to develop HCNs for DOE.

  16. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, R.; Friis Pedersen, T.; Dunbabin, P.; Antoniou, I.; Frandsen, S.; Klug, H.; Albers, A.; Lee, W.K.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard for wind turbine power performance testing. The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project it describes, has been designed to help provide a solid technical foundation for this revised standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support of fundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle anemometry, multi-variate regression analysis and density normalisation. (au)

  17. In situ impulse test: an experimental and analytical evaluation of data interpretation procedures

    International Nuclear Information System (INIS)

    1975-08-01

    Special experimental field testing and analytical studies were undertaken at Fort Lawton in Seattle, Washington, to study ''close-in'' wave propagation and evaluate data interpretation procedures for a new in situ impulse test. This test was developed to determine the shear wave velocity and dynamic modulus of soils underlying potential nuclear power plant sites. The test is different from conventional geophysical testing in that the velocity variation with strain is determined for each test. In general, strains between 10 -1 and 10 -3 percent are achieved. The experimental field work consisted of performing special tests in a large test sand fill to obtain detailed ''close-in'' data. Six recording transducers were placed at various points on the energy source, while approximately 37 different transducers were installed within the soil fill, all within 7 feet of the energy source. Velocity measurements were then taken simultaneously under controlled test conditions to study shear wave propagation phenomenology and help evaluate data interpretation procedures. Typical test data are presented along with detailed descriptions of the results

  18. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  19. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures and...

  20. Chewability testing in the development of a chewable tablet for hyperphosphatemia.

    Science.gov (United States)

    Lanz, Michael; Baldischweiler, Jan; Kriwet, Burkhard; Schill, Jutta; Stafford, John; Imanidis, Georgios

    2014-12-01

    The official Pharmacopeia does not include a test procedure for the in vitro estimation of the chewability of tablets and publications in the scientific literature on this subject are rare. The purpose of this study was to evaluate a number of different test procedures for assessing chewability, starting from standard breaking force and strength testing and progressing to develop new procedures that simulate the actual chewing action on tablets. A further goal was to apply these test procedures to characterize the chewability of the novel phosphate binder PA21 in comparison with a commercially available phosphate binder chewable tablet product based on lanthanum (Fosrenol®) and a chewable tablet product containing calcium (Calcimagon®) - the latter being used as a standard for its very good chewability. For this purpose, a number of development formulations (different batches of PA21) were tested. The radial or diametrical tablet breaking force offers a poor means of assessing chewability while the axial breaking force was concluded to better reflect the effect of chewing on the tablet. Measurement of tablet behavior upon repeated loading afforded the best simulation of the actual chewing action and was found to have a good discriminating power with respect to chewability of the tested tablets, especially when the tablet was moistened with artificial saliva. The developed tests are shown to be more suitable for evaluating chewing properties of tablets than currently used Pharmacopeial tests. Following ICHQ6, which calls for specification of hardness for chewable tablets, these test procedures enabled the optimal chewability features of PA21 tablets in development to be confirmed whilst still maintaining capabilities for robust production and transportation processes.

  1. CANFLEX fuel bundle cross-flow endurance test 2 (test procedure)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Deok; Chung, C. H.; Chang, S. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    This report describes test procedure of cross-flow 2 test for CANFLEX fuel. In October 1996. a cross-flow test was successfully performed in the KAERI Hot Test Loop for four hours at a water flow rate of 31kg/s, temperature of 266 deg C and inlet pressure of 11MPa, but it is requested more extended time periods to determine a realistic operational margin for the CANFLEX bundle during abnormal refuelling operations. The test shall be conducted for twenty two hours under the reactor conditions. After an initial period of ten hours, the test shall be stopped at the intervals of four hours for bundle inspection and inspect the test bundle end-plate to end-cap welds for failure or crack propagation using liquid penetrant examination. 2 refs., 1 fig. (Author)

  2. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Research, development, demonstration, and testing. 1021... ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.212 Research, development, demonstration, and testing. (a) This section applies to the adoption and application of programs that involve research...

  3. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... device, the exhaust pipe must be the same diameter as found in-use for at least 4 pipe diameters upstream... Exhaust Test Procedures § 86.1327-96 Engine dynamometer test procedures; overview. (a) The engine.... The exhaust emissions are diluted with ambient air and a continuous proportional sample is collected...

  4. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and... (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... mode energy use of products that combine a microwave oven with other appliance functionality, as well...

  5. Development and evaluation of Standard Operating Procedures (SOPs) for quality control tests and radiological protection activities in a Nuclear Medicine Service

    Energy Technology Data Exchange (ETDEWEB)

    Krempser, Alexandre R., E-mail: krempser@peb.ufrj.br [Universidade Federal do Rio de Janeiro (PEB/COPPE/UFRJ), RJ (Brazil). Programa de Engenharia Biomedica; Soares, Alexandre B. [Universidade Federal do Rio de Janeiro (IF/UFRJ), Rio de Janeiro, RJ (Brazil). Inst. de Fisica; Corbo, Rossana [Universidade Federal do Rio de Janeiro (FM/UFRJ), Rio de Janeiro, RJ (Brazil). Dept. de Radiologia

    2011-07-01

    The quality management in Nuclear Medicine Services is a requirement of national and international standards. The Brazilian regulatory agency in health surveillance, the Agencia Nacional de Vigilancia Sanitaria (ANVISA), in its Resolucao de Diretoria Colegiada (Collegiate Directory Resolution) no. 38, requires the elaboration of documents describing the technical and clinical routine activities. This study aimed to elaborate, implement and evaluate Standard Operating Procedures (SOPs) for quality control tests and radiological protection activities in the Nuclear Medicine Service of a university hospital. Eighteen SOPs were developed, involving tasks related to dose calibrator, gamma camera, Geiger-Muller detectors and radiological protection activities. The performance of its application was evaluated for a period of six months. It was observed a reduction in 75% of reported operational errors and 42% of the number of reported incidents with contamination by radioactive material. The SOPs were adequate and successful in its application. New procedures involving clinical activities will also be developed and evaluated. (author)

  6. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  9. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  10. Development of Applicable Test Scenario by the Grid Simulator of a Functional Test Bench

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber

    In this thesis, a data-driven testing procedure for wind turbine generators is developed. The procedure generates a data set for a hardware-in-the-loop testing setup at a test facility. The goal is to shorten validation process, prevent damage from highly dangerous grid tests, and conduct different...... tests. The proposed procedure deploys a multivariate statistical model of the power grid derived from the wind farm's standpoint. A practical data set of an operational wind farm is available which is logged during the years of 2013 and 2014 for model identification and validation, respectively....... The first step of modeling is deriving the model from the standpoint of an arbitrary wind turbine generator utilizing dynamic principal component analysis. The model is the transformed data samples into a new projected space, i.e. latent space, as the combination of the principal components and the scores...

  11. Testing and qualification of confidence in statistical procedures

    Energy Technology Data Exchange (ETDEWEB)

    Serghiuta, D.; Tholammakkil, J.; Hammouda, N. [Canadian Nuclear Safety Commission (Canada); O' Hagan, A. [Sheffield Univ. (United Kingdom)

    2014-07-01

    tests, but targeted to the context of the particular application and aimed at identifying the domain of validity of the proposed tolerance limit method and algorithm, might provide the necessary confidence in the proposed statistical procedure. The Ontario Power Generation, Bruce Power and AMEC-NSS have supported this work and contributed to the development and execution of the test cases. Their statistical method and results are not, however, discussed in this paper. (author)

  12. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    International Nuclear Information System (INIS)

    Biyani, R.K.; Hendrickson, D.W.

    1997-01-01

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations

  13. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  14. Procedures for Selecting Items for Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1989-01-01

    Several classical approaches and alternative approaches to item selection for computerized adaptive testing (CAT) are reviewed and compared. The study also describes procedures for constrained CAT that may be added to classical item selection approaches to allow them to be used for applied testing. (TJH)

  15. New energy test procedures for refrigerators and other appliances; FINAL

    International Nuclear Information System (INIS)

    Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

    1999-01-01

    Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  18. Procedures for parametric studies of costs of superconducting toroidal test assemblies

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1976-05-01

    A cost scaling procedure, based on a detailed reference conceptual design, has been developed to determine the effects of variations in the characteristic parameters of superconducting toroidal field coils on project costs. The primary purpose was to provide reasonably simple rational formulae for obtaining approximate costs of a complete installation, focusing on the trends and sensitivities of costs to changes in various parameters such as field strength, coil size, number of coils, and current density rather than establishing absolute costs. No results are included here because early studies applying these procedures are no longer pertinent to the present Superconducting Magnet Development Program. However, planning for the Large Coil Project and the preliminary conceptual design of the Technology Test Assembly with Plasma have employed the techniques described and results will be reported in the appropriate project documents

  19. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... provided less forecast accuracy improvement and it needed a longer time to achieve relatively acceptable forecast uncertainty....

  20. 40 CFR 53.43 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... sampling zone (see § 53.42(d)). To meet the maximum blockage limit of § 53.42(a) or for convenience, part... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind tunnel. Collect...

  1. 40 CFR 600.111-08 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... § 600.109(b) while sampling the exhaust gas. (viii) Sampling must begin two seconds before beginning the... convenience of the user, the revised text is set forth as follows: § 600.111-08 Test procedures. (f) Special...

  2. Simulation and analysis of data for enhancing low cycle fatigue test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Sarajaervi, U.; Cronvall, O. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The simulation and analysis of data for enhancing low cycle fatigue test procedures is discussed in this report. The analysed materials are an austenitic stainless piping steel and an austenitic weld material. This project continues the work performed in 2003 and 2004. The fatigue test data treatment application developed within the project in 2004 for the preparation of the fatigue data has been developed further. Also, more fatigue test data has been analysed with the application than in 2004. In addition to this numerical fatigue simulations were performed with FEM code ABAQUS. With the fatigue test data treatment application one can e.g. both calculate cyclically certain relevant characteristic values, e.g. elastic range, and form a set of certain cyclical parameter values needed as a part of ABAQUS analysis input files. The hardening properties of metals were modelled with both isotropic and kinematic hardening models. The further development of the application included trimming of the analysed data, and consequently trimming of resulting hardening parameters. The need for the trimming arose from the fact that the analysed fatigue test data presents some scatter caused by the limited accuracy of the test equipment and the sampling rate. The hardening parameters obtained from the application analysis results were used in the subsequent ABAQUS analyses, and then the fatigue test data were compared with the ABAQUS simulation results. After finding a procedure to trim result data to get smooth curves for cyclic hardening, hardening and softening could be reproduced in ABAQUS analysis with a reasonable accuracy. The modelling of the fatigue induced initiation and growth of cracks was not considered in this study. On the other hand, a considerable part of the fatigue life of nuclear power plant (NPP) piping components is spent in the phase preceding the initiation and growth of cracks. (au)

  3. Simulation and analysis of data for enhancing low cycle fatigue test procedures

    International Nuclear Information System (INIS)

    Sarajaervi, U.; Cronvall, O.

    2006-04-01

    The simulation and analysis of data for enhancing low cycle fatigue test procedures is discussed in this report. The analysed materials are an austenitic stainless piping steel and an austenitic weld material. This project continues the work performed in 2003 and 2004. The fatigue test data treatment application developed within the project in 2004 for the preparation of the fatigue data has been developed further. Also, more fatigue test data has been analysed with the application than in 2004. In addition to this numerical fatigue simulations were performed with FEM code ABAQUS. With the fatigue test data treatment application one can e.g. both calculate cyclically certain relevant characteristic values, e.g. elastic range, and form a set of certain cyclical parameter values needed as a part of ABAQUS analysis input files. The hardening properties of metals were modelled with both isotropic and kinematic hardening models. The further development of the application included trimming of the analysed data, and consequently trimming of resulting hardening parameters. The need for the trimming arose from the fact that the analysed fatigue test data presents some scatter caused by the limited accuracy of the test equipment and the sampling rate. The hardening parameters obtained from the application analysis results were used in the subsequent ABAQUS analyses, and then the fatigue test data were compared with the ABAQUS simulation results. After finding a procedure to trim result data to get smooth curves for cyclic hardening, hardening and softening could be reproduced in ABAQUS analysis with a reasonable accuracy. The modelling of the fatigue induced initiation and growth of cracks was not considered in this study. On the other hand, a considerable part of the fatigue life of nuclear power plant (NPP) piping components is spent in the phase preceding the initiation and growth of cracks. (au)

  4. Bureau of radiological health compliance testing procedures for cabinet S-ray systems

    International Nuclear Information System (INIS)

    Miller, E.A.; Sprau, D.

    1976-01-01

    A manual has been developed by the Bureau of Radiological Health of the Food and Drug Administration to establish procedures for the routine field testing of cabinet x-ray systems to determine compliance with the Federal Performance Standard for Cabinet X-Ray Systems, 21 CFR 1020.40. The manual provides specific instructions for testing each model of cabinet x-ray system. Results from the inspection are recorded on a data from which is designed to permit automatic data processing

  5. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  6. Fibre Laser Welding of HY-80 Steel: Procedure Development and Testing

    Science.gov (United States)

    2010-09-01

    2 Welding The material used in this study was quenched and tempered martensitic HY80 steel which conforms to MIL-S-1621 [2]. The testing...Journal, 1977. [4] AWS, D1.6 in Structural Welding Code Stainless Steel . 2007, American Welding Society: Miami Florida. [5] DefStan, 02-770 Part 2...Canada Fibre Laser Welding of HY-80 Steel Proceedure Development and Testing Christopher Bayley DLP Neil Aucoin DLP Xinjin Cao NRC IAR AMTC Technical

  7. A test procedure for determining the influence of stress ratio on fatigue crack growth

    Science.gov (United States)

    Fitzgerald, J. H.; Wei, R. P.

    1974-01-01

    A test procedure is outlined by which the rate of fatigue crack growth over a range of stress ratios and stress intensities can be determined expeditiously using a small number of specimens. This procedure was developed to avoid or circumvent the effects of load interactions on fatigue crack growth, and was used to develop data on a mill annealed Ti-6Al-4V alloy plate. Experimental data suggest that the rates of fatigue crack growth among the various stress ratios may be correlated in terms of an effective stress intensity range at given values of K max. This procedure is not to be used, however, for determining the corrosion fatigue crack growth characteristics of alloys when nonsteady-state effects are significant.

  8. Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection

    Science.gov (United States)

    2008-09-12

    this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented

  9. Characterization Test Procedures for Intersection Collision Avoidance Systems Based on Vehicle-to-Vehicle Communications

    Science.gov (United States)

    2015-12-01

    Characterization test procedures have been developed to quantify the performance of intersection collision avoidance (ICA) systems based on vehicle-to-vehicle communications. These systems warn the driver of an imminent crossing-path collision at a r...

  10. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  11. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax... displacement (compression) relative to the spine, measured with the chest deflection transducer (SA-572-S50...

  12. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... September 14, 1977. 42 FR 46140. Industry representatives viewed these test procedures as too complex and... Freezers'' (HRF-1- 1979). Using this industry-created test procedure, DOE revised its test procedures on... compartment of such a product to be at a level that would effectively exclude the coverage of combination wine...

  13. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the... energy use of products that combine a microwave oven with other appliance functionality, as well as minor...

  14. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  15. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a... specified in 49 CFR 572.124(c): (1) The maximum sternum displacement relative to the spine, measured with...

  16. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  17. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  18. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  19. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  20. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  1. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging

  2. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  3. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  4. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...... for a monopile testing was provided by Thomassen (2015a), procedure for monopile testing can be found in Thomassen (2015b), while safety instructions were given by Vaitkunaite et al. (2014)....

  5. Development of small specimen test techniques. Development of a remote controlled small punch testing apparatus

    International Nuclear Information System (INIS)

    Ohmi, Masao; Saito, Junichi; Ooka, Norikazu; Jitsukawa, Shiro; Hishinuma, Akimichi; Umino, Akira.

    1997-01-01

    An accelerator-driven deuterium-lithium (d-Li) stripping reaction-type neutron source, such as the International Fusion Materials Irradiation Facility (IFMIF) planned by the International Energy Agency is recognized as one of the most promising facility to obtain test environments of high-energy neutrons for fusion reactor materials development. The limitation on the available irradiation volume of the irradiation facility requires the development of the small specimen test techniques (SSTT). Application of SSTT to evaluate the degradation of various components in the light water reactor for the life extension is expected to be also quite beneficial. A remote-controlled testing machine for the Small Punch (SP) and miniaturized tensile tests was developed at the hot laboratory of the Japan Materials Testing Reactor (JMTR). The machine is designed for testing at temperatures ranging between 93 and 1,123 K to evaluate the temperature dependence of the strength of materials including the embrittlement at low temperatures and the softening at elevated temperatures. The tests are performed in a vacuum or in an inert gas environment. The machine has been installed in a hot cell and is being used for the round robin test program of the SP test method. The round robin test program is planned to identify the capability of the test method and to establish a standard test procedure. The configuration and the specifications of the test machine are introduced and the results of the SP tests are also shown. (author)

  6. Good practices with respect to the development and use of nuclear power plant procedures

    International Nuclear Information System (INIS)

    1998-12-01

    This technical publication is intended to provide information to nuclear power plant managers concerning good practices in respect to the development and use of NPP procedures. It is a part of an ongoing project on nuclear power plant instrumentation and control and is based on lessons learned from NPPs and utilities. The overall objective of this project is to provide systematic guidance on current and emerging instrumentation and control technologies including: protection and automation systems, control rooms, operator support systems, training simulators and human factors. It is intended to be applicable to NPPs in Member States that are in operation, under construction or being commissioned. The good practices described are consistent with the IAEA Safety Series recommendations with respect to the development and use of NPP procedures including the four categories: administrative procedures, operating procedures (normal, alarm response, abnormal and emergency procedures), maintenance and technical support procedures, and testing and surveillance procedures

  7. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion. 1209.7 Section 1209.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY... for smoldering combustion. This section provides the test method for determining smoldering combustion...

  8. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  9. DEVELOPING COMMUNICATIVE LANGUAGE TESTS FOR SENIOR HIGH SCHOOL

    Directory of Open Access Journals (Sweden)

    Y. M. Harsono

    2005-01-01

    Full Text Available The Communicative Approach of teaching English in senior high school in Indonesia has been adopted since the implementation of The 1984 Curriculum, but the tests–the communicative language tests–(CL Tests have not been developed and used properly. The objective of the study is to develop CL Tests for senior high school. The procedure of conducting the study consists of three major steps, that is, identifying the objectives, developing the test specification, and developing the CL Tests. The development of the CL Tests in detail consists of fifteen sub-steps from determining what language skills tested, selecting the suitable source materials, up to rewriting the CL Tests to be used as CL Tests alternative for senior high school. The results of the test development reveal that there are fifteen CL Tests consisting of three tests of listening, three reading, three speaking, and three writing tests. The whole tests have construct and content validity, no complete evidence of concurrent validity with report marks and semester test scores, high to very high inter-rater reliability, and no complete practicality.

  10. Testing alarm resolution procedures in a fuel fabrication facility

    International Nuclear Information System (INIS)

    Smith, B.W.; Razvi, J.

    1984-07-01

    Process monitoring data can be used for generating material loss estimates. The intent of using process control data is to enhance nuclear material control and accounting for the timely detection and resolution of discrepancies. The purpose of an alarm resolution system is to distinguish between system errors and an actual loss of nuclear material. A study has been performed to develop and test a site-specific set of alarm resolution procedures. The results of the study are described and include the frequency of alarms, the causes of alarms, the type of resolution, and the modeling of loss estimates. 3 references, 2 figures, 2 tables

  11. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  12. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF ENERGY [Docket Number EERE-2011-BT-TP-0041] RIN 1904-AC50 Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires) AGENCY: Office of Energy Efficiency and Renewable... (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires...

  13. Test procedures, AN/AIC-27 system and component units. [for space shuttle

    Science.gov (United States)

    Reiff, F. H.

    1975-01-01

    The AN/AIC-27 (v) intercommunication system is a 30-channel audio distribution which consists of: air crew station units, maintenance station units, and a central control unit. A test procedure for each of the above units and also a test procedure for the system are presented. The intent of the test is to provide data for use in shuttle audio subsystem design.

  14. 75 FR 38422 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-07-02

    ... 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of..., 2011. DATES: This rule is effective July 2, 2010. FOR FURTHER INFORMATION CONTACT: For program issues... Federal Regulations, as follows: PART 40--PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING...

  15. Preanalytical errors in primary healthcare: a questionnaire study of information search procedures, test request management and test tube labelling.

    Science.gov (United States)

    Söderberg, Johan; Brulin, Christine; Grankvist, Kjell; Wallin, Olof

    2009-01-01

    Most errors in laboratory medicine occur in the preanalytical phase and are the result of human mistakes. This study investigated information search procedures, test request management and test tube labelling in primary healthcare compared to the same procedures amongst clinical laboratory staff. A questionnaire was completed by 317 venous blood sampling staff in 70 primary healthcare centres and in two clinical laboratories (response rate = 94%). Correct procedures were not always followed. Only 60% of the primary healthcare staff reported that they always sought information in the updated, online laboratory manual. Only 12% reported that they always labelled the test tubes prior to drawing blood samples. No major differences between primary healthcare centres and clinical laboratories were found, except for test tube labelling, whereby the laboratory staff reported better practices. Re-education and access to documented routines were not clearly associated with better practices. The preanalytical procedure in the surveyed primary healthcare centres was associated with a risk of errors which could affect patient safety. To improve patient safety in laboratory testing, all healthcare providers should survey their preanalytical procedures and improve the total testing process with a systems perspective.

  16. Thermal-hydraulic tests with out-of-pile test facility for BOCA development

    International Nuclear Information System (INIS)

    Kitagishi, Shigeru; Aoyama, Masashi; Tobita, Masahiro; Inaba, Yoshitomo; Yamaura, Takayuki

    2012-01-01

    The fuel transient test facility was prepared for power ramping tests of light-water-reactor (LWR) fuels in the Japan Materials Testing Reactor (JMTR) under a contract project with the Nuclear Industrial Safety Agent (NISA) of the Ministry of Economy, Trade and Industry (METI). It is necessary to develop high accuracy analysis procedure for power ramping tests after restart of the JMTR. The out-of-pile test facility to simulate thermal-hydraulic conditions of the fuel transient test facility was therefore developed. Applicability of the analysis code ACE-3D was examined for thermal-hydraulic analysis of power ramping tests for 10x10 BWR fuels by the fuel transient test facility. As the results, the calculated temperature was 304°C in comparison with measured value of 304.9-317.4°C in the condition of 600 W/cm. There is a bright prospect of high accuracy power ramping tests by the fuel transient test facility in JMTR. (author)

  17. Dermal and inhalation acute toxic class methods: test procedures and biometric evaluations for the Globally Harmonized Classification System.

    Science.gov (United States)

    Holzhütter, H G; Genschow, E; Diener, W; Schlede, E

    2003-05-01

    The acute toxic class (ATC) methods were developed for determining LD(50)/LC(50) estimates of chemical substances with significantly fewer animals than needed when applying conventional LD(50)/LC(50) tests. The ATC methods are sequential stepwise procedures with fixed starting doses/concentrations and a maximum of six animals used per dose/concentration. The numbers of dead/moribund animals determine whether further testing is necessary or whether the test is terminated. In recent years we have developed classification procedures for the oral, dermal and inhalation routes of administration by using biometric methods. The biometric approach assumes a probit model for the mortality probability of a single animal and assigns the chemical to that toxicity class for which the best concordance is achieved between the statistically expected and the observed numbers of dead/moribund animals at the various steps of the test procedure. In previous publications we have demonstrated the validity of the biometric ATC methods on the basis of data obtained for the oral ATC method in two-animal ring studies with 15 participants from six countries. Although the test procedures and biometric evaluations for the dermal and inhalation ATC methods have already been published, there was a need for an adaptation of the classification schemes to the starting doses/concentrations of the Globally Harmonized Classification System (GHS) recently adopted by the Organization for Economic Co-operation and Development (OECD). Here we present the biometric evaluation of the dermal and inhalation ATC methods for the starting doses/concentrations of the GHS and of some other international classification systems still in use. We have developed new test procedures and decision rules for the dermal and inhalation ATC methods, which require significantly fewer animals to provide predictions of toxicity classes, that are equally good or even better than those achieved by using the conventional LD(50)/LC

  18. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  19. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  20. 10 CFR 431.193 - Test procedures for measuring energy consumption of distribution transformers.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for measuring energy consumption of distribution transformers. 431.193 Section 431.193 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY... § 431.193 Test procedures for measuring energy consumption of distribution transformers. The test...

  1. Laparoscopic Stephen-Fowler stage procedure: appropriate management for high intra-abdominal testes.

    Science.gov (United States)

    Agrawal, Amit; Joshi, Milind; Mishra, Pankaj; Gupta, Rahul; Sanghvi, Beejal; Parelkar, Sandesh

    2010-03-01

    The length of testicular vessels is the main length-limiting factor to bring down the testes in the scrotum. Fowler and Stephen proposed the division of testicular vessels, high and as far from the testes as possible to maintain collateral blood supply, to treat high intra-abdominal testes. Cortesi introduced the diagnostic laparoscopy and Jorden first did the laparoscopic orchiopexy for nonpalpable testes. We had done Fowler-Stephen staged orchiopexy for high intra-abdominal testes, in which both stages were done laparoscopically. In total, 17 testes of 13 patients had undergone laparoscopic staged Fowler-Stephen orchiopexy. The decision to perform a staged Fowler-Stephen orchiopexy was based on the distance of the testis from the deep inguinal ring on laparoscopy. If distance was more than 2.5 cm, then we proceeded to a laparoscopic staged Fowler-Stephen orchiopexy. In the first stage, testicular vessels were cauterized by bipolar diathermy. Laparoscopic second-stage Fowler-Stephen procedure was done 6 months after the first stage. Patients were regularly followed, and the success of the procedure was assessed by the size of the testes and the position in the scrotum. Testicular vascularity was assessed by color Doppler ultrasonography. There was no testicular atrophy on second stage and on follow-up. All testes were in the scrotum with good size on follow-up. There was no complication related to laparoscopy. In cases of high intra-abdominal testes, the staged Fowler-Stephen procedure should be the procedure of choice. This procedure yields a high success rate. Transaction of vessels by bipolar diathermy is a very safe, cost-effective method.

  2. Influence of Test Procedures on the Thermomechanical Properties of a 55NiTi Shape Memory Alloy

    Science.gov (United States)

    Padula, Santo A., II; Gaydosh, Darrell J.; Noebe, Ronald D.; Bigelow, Glen S.; Garg, Anita; Lagoudas, Dimitris; Karaman, Ibrahim; Atli, Kadri C.

    2008-01-01

    Over the past few decades, binary NiTi shape memory alloys have received attention due to their unique mechanical characteristics, leading to their potential use in low-temperature, solid-state actuator applications. However, prior to using these materials for such applications, the physical response of these systems to mechanical and thermal stimuli must be thoroughly understood and modeled to aid designers in developing SMA-enabled systems. Even though shape memory alloys have been around for almost five decades, very little effort has been made to standardize testing procedures. Although some standards for measuring the transformation temperatures of SMA s are available, no real standards exist for determining the various mechanical and thermomechanical properties that govern the usefulness of these unique materials. Consequently, this study involved testing a 55NiTi alloy using a variety of different test methodologies. All samples tested were taken from the same heat and batch to remove the influence of sample pedigree on the observed results. When the material was tested under constant-stress, thermal-cycle conditions, variations in the characteristic material responses were observed, depending on test methodology. The transformation strain and irreversible strain were impacted more than the transformation temperatures, which only showed an affect with regard to applied external stress. In some cases, test methodology altered the transformation strain by 0.005-0.01mm/mm, which translates into a difference in work output capability of approximately 2 J/cu cm (290 in!lbf/cu in). These results indicate the need for the development of testing standards so that meaningful data can be generated and successfully incorporated into viable models and hardware. The use of consistent testing procedures is also important when comparing results from one research organization to another. To this end, differences in the observed responses will be presented, contrasted and

  3. An Application of Graphical Approach to Construct Multiple Testing Procedure in a Hypothetical Phase III Design

    Directory of Open Access Journals (Sweden)

    Naitee eTing

    2014-01-01

    Full Text Available Many multiple testing procedures (MTP have been developed in recent years. Among these new procedures, the graphical approach is flexible and easy to communicate with non-statisticians. A hypothetical Phase III clinical trial design is introduced in this manuscript to demonstrate how graphical approach can be applied in clinical product development. In this design, an active comparator is used. It is thought that this test drug under development could potentially be superior to this comparator. For comparison of efficacy, the primary endpoint is well established and widely accepted by regulatory agencies. However, an important secondary endpoint based on Phase II findings looks very promising. The target dose may have a good opportunity to deliver superiority to the comparator. Furthermore, a lower dose is included in case the target dose may demonstrate potential safety concerns. This Phase III study is designed as a non-inferiority trial with two doses, and two endpoints. This manuscript will illustrate how graphical approach is applied to this design in handling multiple testing issues.

  4. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  5. The development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1983-04-01

    Until recently the formal treatment of control room procedures for nuclear power plant upset conditions has been event-oriented. The demise of Three Mile Island, Unit 2, caused the American industry to recognize the pitfalls inherent in relying totally on event-oriented procedures, and led to the initiation of a program for the development of a symptoms-oriented approach for handling upset conditions. The U.S. program has been independently paralleled by a Canadian program. This paper describes the development of the Canadian symptoms-oriented philosophy and identifies the relevance of a generic symptoms based emergency procedure to current operating practices

  6. 100 Area soil washing bench-scale test procedures

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing

  7. 9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.

    Science.gov (United States)

    2010-01-01

    ... samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... for diagnostic testing. (b) The authorized laboratory must identify each egg as to the breeding flock...

  8. 77 FR 49063 - Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products

    Science.gov (United States)

    2012-08-15

    ... Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products; Proposed...-AC01 Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products... procedures for both dishwashers and conventional cooking products for the measurement of energy use in fan...

  9. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... Energy (DOE) is amending its test procedures for residential water heaters, direct heating equipment (DHE... necessary for residential water heaters, because the existing test procedures for those products already...

  10. 76 FR 56347 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2011-09-13

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... proposed to amend, where appropriate, its test procedures for residential water heaters, direct heating... notes that the test procedure and metric for residential water heaters currently address and incorporate...

  11. Laboratory procedures for waste form testing

    International Nuclear Information System (INIS)

    Mast, E.S.

    1994-01-01

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory

  12. Laboratory procedures for waste form testing

    Energy Technology Data Exchange (ETDEWEB)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  13. Assessment of Calculation Procedures for Piles in Clay Based on Static Loading Tests

    DEFF Research Database (Denmark)

    Augustesen, Anders; Andersen, Lars

    2008-01-01

    College in London. The calculation procedures are assessed based on an established database of static loading tests. To make a consistent evaluation of the design methods, corrections related to undrained shear strength and time between pile driving and testing have been employed. The study indicates...... that the interpretation of the field tests is of paramount importance, both with regard to the soil profile and the loading conditions. Based on analyses of 253 static pile loading tests distributed on 111 sites, API-RP2A provides the better description of the data. However, it should be emphasised that some input......Numerous methods are available for the prediction of the axial capacity of piles in clay. In this paper, two well-known models are considered, namely the current API-RP2A (1987 to present) and the recently developed ICP method. The latter is developed by Jardine and his co-workers at Imperial...

  14. Progress in Developing Finite Element Models Replicating Flexural Graphite Testing

    International Nuclear Information System (INIS)

    Bratton, Robert

    2010-01-01

    This report documents the status of flexural strength evaluations from current ASTM procedures and of developing finite element models predicting the probability of failure. This work is covered under QLD REC-00030. Flexural testing procedures of the American Society for Testing and Materials (ASTM) assume a linear elastic material that has the same moduli for tension and compression. Contrary to this assumption, graphite is known to have different moduli for tension and compression. A finite element model was developed and demonstrated that accounts for the difference in moduli tension and compression. Brittle materials such as graphite exhibit significant scatter in tensile strength, so probabilistic design approaches must be used when designing components fabricated from brittle materials. ASTM procedures predicting probability of failure in ceramics were compared to methods from the current version of the ASME graphite core components rules predicting probability of failure. Using the ASTM procedures yields failure curves at lower applied forces than the ASME rules. A journal paper was published in the Journal of Nuclear Engineering and Design exploring the statistical models of fracture in graphite.

  15. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  16. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  17. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  18. Development of QC Procedures for Ocean Data Obtained by National Research Projects of Korea

    Science.gov (United States)

    Kim, S. D.; Park, H. M.

    2017-12-01

    To establish data management system for ocean data obtained by national research projects of Ministry of Oceans and Fisheries of Korea, KIOST conducted standardization and development of QC procedures. After reviewing and analyzing the existing international and domestic ocean-data standards and QC procedures, the draft version of standards and QC procedures were prepared. The proposed standards and QC procedures were reviewed and revised by experts in the field of oceanography and academic societies several times. A technical report on the standards of 25 data items and 12 QC procedures for physical, chemical, biological and geological data items. The QC procedure for temperature and salinity data was set up by referring the manuals published by GTSPP, ARGO and IOOS QARTOD. It consists of 16 QC tests applicable for vertical profile data and time series data obtained in real-time mode and delay mode. Three regional range tests to inspect annual, seasonal and monthly variations were included in the procedure. Three programs were developed to calculate and provide upper limit and lower limit of temperature and salinity at depth from 0 to 1550m. TS data of World Ocean Database, ARGO, GTSPP and in-house data of KIOST were analysed statistically to calculate regional limit of Northwest Pacific area. Based on statistical analysis, the programs calculate regional ranges using mean and standard deviation at 3 kind of grid systems (3° grid, 1° grid and 0.5° grid) and provide recommendation. The QC procedures for 12 data items were set up during 1st phase of national program for data management (2012-2015) and are being applied to national research projects practically at 2nd phase (2016-2019). The QC procedures will be revised by reviewing the result of QC application when the 2nd phase of data management programs is completed.

  19. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  20. Development of an accelerated creep testing procedure for geosynthetics : technical summary.

    Science.gov (United States)

    1997-09-01

    Temperature-creep relationships in geosynthetics vary for each type of geogrid and depend on many factors such as polymer structure, manufacture process, degree of crystallinity, and glass-transition temperature. The extrapolation procedures to predi...

  1. Development of a radionuclide short-test for the evaluation of engine oils in respect to cam- and cylinder linear wear by using OM 616 Kombi-Test conditions

    International Nuclear Information System (INIS)

    Volz, J.; Lausch, W.

    1980-05-01

    A survey is given on the studies performed since 1973 on the development of radionuclide short-test procedure, based on the test procedure of the OM 616 Kombi-Test, for the evaluation of engine oils in respect to cam- and cylinder liner wear (deuteron activated Co-56). Out of the results of these studies on experimental short test procedure has been elaborated to evaluate cylinder liner wear. With this experimental procedure some round robin testing has been carried out by three laboratories using a well-known reference oil and two test oils. The results of this round robin test led to further improvements in the test procedure. This improved test procedure has become a suitable screening-test for the development of engine oils in respect to cylinder liner wear. It never can replace the OM 616-Kombi-Test as a whole, but it will complete it. The radionuclide short test gets results quicker and at lower costs than the Kombi-Test, discriminates between hot test and cold-warm test results, and gives results even with correlation to the Kombi-Test by comparison to an approved reference oil. For such screening work, the repeatability of the test is also sufficient. (orig./HP) [de

  2. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  3. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  4. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  5. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  6. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  7. 40 CFR 92.123 - Test procedure; general requirements.

    Science.gov (United States)

    2010-07-01

    ... the test. Auxiliary fan(s) may be used to maintain engine cooling during operation on the dynamometer... smoke. (1) In the raw exhaust sampling procedure, sample is collected directly from the exhaust stream... of another raw exhaust sample. The fuel flow rate for each throttle setting is measured. (2) For...

  8. 40 CFR 86.1527 - Idle test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ... from a single exhaust pipe in which exhaust products are homogeneously mixed. The configuration for... additional “Y” pipe be placed in the exhaust system before dilution. [48 FR 52252, Nov. 16, 1983... determine the raw concentration (in percent) of CO in the exhaust flow at idle. The test procedure begins...

  9. Reconnaissance On Chi-Square Test Procedure For Determining Two Species Association

    Science.gov (United States)

    Marisa, Hanifa

    2008-01-01

    Determining the assosiation of two species by using chi-square test has been published. Utility of this procedure to plants species at certain location, shows that the procedure could not find "ecologically" association. Tens sampling units have been made to record some weeds species in Indralaya, South Sumatera. Chi square test; Xt2 = N[|(ad)-(bc)|-(N/2)]2/mnrs (Eq:1) on two species (Cleome sp and Eleusine indica) of the weeds shows positive assosiation; while ecologically in nature, there is no relationship between them. Some alternatives are proposed to this problem; simplified chi-square test steps, make further study to find out ecologically association, or at last, ignore it.

  10. A P-value model for theoretical power analysis and its applications in multiple testing procedures

    Directory of Open Access Journals (Sweden)

    Fengqing Zhang

    2016-10-01

    Full Text Available Abstract Background Power analysis is a critical aspect of the design of experiments to detect an effect of a given size. When multiple hypotheses are tested simultaneously, multiplicity adjustments to p-values should be taken into account in power analysis. There are a limited number of studies on power analysis in multiple testing procedures. For some methods, the theoretical analysis is difficult and extensive numerical simulations are often needed, while other methods oversimplify the information under the alternative hypothesis. To this end, this paper aims to develop a new statistical model for power analysis in multiple testing procedures. Methods We propose a step-function-based p-value model under the alternative hypothesis, which is simple enough to perform power analysis without simulations, but not too simple to lose the information from the alternative hypothesis. The first step is to transform distributions of different test statistics (e.g., t, chi-square or F to distributions of corresponding p-values. We then use a step function to approximate each of the p-value’s distributions by matching the mean and variance. Lastly, the step-function-based p-value model can be used for theoretical power analysis. Results The proposed model is applied to problems in multiple testing procedures. We first show how the most powerful critical constants can be chosen using the step-function-based p-value model. Our model is then applied to the field of multiple testing procedures to explain the assumption of monotonicity of the critical constants. Lastly, we apply our model to a behavioral weight loss and maintenance study to select the optimal critical constants. Conclusions The proposed model is easy to implement and preserves the information from the alternative hypothesis.

  11. Test Bench Development for Femur Stability Assessment

    Directory of Open Access Journals (Sweden)

    Samuel SANCHEZ-CABALLERO

    2015-01-01

    Full Text Available This paper shows the design and development of a test bench for humanfemurs. The main uses of this test bench will run from artificial femurs comparisonwith real femurs, to join stability assessment after bone a fracture repair. Amongthis uses is specially designed for condylar fractures testing. The test bench isdeveloped from a self-made existing tensile/compression testing machine. Thedesign procedure is supported by a literature review about the bone mechanicalbehavior and composition generally and the knee joint performance and repairparticularly. On the basis of this review, the machine was designed to simulate theadduction and abduction movements of the joint. The magnitudes to be measuredare: the compression force, the bone displacement (vertical and the knee jointrotation

  12. Procedure guideline for radioiodine test (version 3)

    International Nuclear Information System (INIS)

    Dietlein, M.; Schicha, H.; Eschner, W.; Deutsche Gesellschaft fuer Medizinische Physik; Koeln Univ.; Lassmann, M.; Deutsche Gesellschaft fuer Medizinische Physik; Wuerzburg Univ.; Leisner, B.; Allgemeines Krankenhaus St. Georg, Hamburg; Reiners, C.; Wuerzburg Univ.

    2007-01-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  13. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    Quality Assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. Computerized radiotherapy treatment planning systems (RTPSs) are now widely available in both industrialised and developing countries so, it is of special importance to support hospitals in the IAEA Member States in developing procedures for acceptance testing, commissioning and ongoing QA of their RTPSs. Responding to these needs, a group of experts developed a comprehensive report, the IAEA Technical Reports Series No 430 'Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer', that provides the general framework and describes a large number of tests and procedures to be considered by the RTPS users. To provide practical guidance for implementation of IAEA Technical Reports Series No. 430 in radiotherapy hospitals and particularly in those with limited resources, a coordinated research project (CRP E2.40.13) 'Development of procedures for dosimetry calculation in radiotherapy' was established. The main goal of the project was to create a set of practical acceptance and commissioning tests for dosimetry calculations in radiotherapy, defined in a dedicated protocol. Two specific guidance publications that were developed in the framework of the Coordinated Research Project E2.40.13 are based on guidelines described in the IAEA Technical Report Series No. 430 and provide a step-by-step description for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for their RTPSs. The first publication, 'Specification and acceptance testing of radiotherapy treatment planning systems' IAEA-TECDOC-1540 uses the International Electrotechnical Commission (IEC) standard IEC 62083 as its basis and addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and

  14. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  15. Guide to good practices for the development of test items

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

  16. Development of Test-Analysis Models (TAM) for correlation of dynamic test and analysis results

    Science.gov (United States)

    Angelucci, Filippo; Javeed, Mehzad; Mcgowan, Paul

    1992-01-01

    The primary objective of structural analysis of aerospace applications is to obtain a verified finite element model (FEM). The verified FEM can be used for loads analysis, evaluate structural modifications, or design control systems. Verification of the FEM is generally obtained as the result of correlating test and FEM models. A test analysis model (TAM) is very useful in the correlation process. A TAM is essentially a FEM reduced to the size of the test model, which attempts to preserve the dynamic characteristics of the original FEM in the analysis range of interest. Numerous methods for generating TAMs have been developed in the literature. The major emphasis of this paper is a description of the procedures necessary for creation of the TAM and the correlation of the reduced models with the FEM or the test results. Herein, three methods are discussed, namely Guyan, Improved Reduced System (IRS), and Hybrid. Also included are the procedures for performing these analyses using MSC/NASTRAN. Finally, application of the TAM process is demonstrated with an experimental test configuration of a ten bay cantilevered truss structure.

  17. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  18. 40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test of Solvent Cleaning Procedures A... CATEGORIES National Emission Standards for Halogenated Solvent Cleaning Pt. 63, Subpt. T, App. A Appendix A to Subpart T of Part 63—Test of Solvent Cleaning Procedures General Questions ___ 1. What is the...

  19. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  20. DEVELOPMENT AND TESTING OF PROCEDURES FOR CARRYING OUT EMERGENCY PHYSICAL INVENTORY TAKING AFTER DETECTING ANOMALY EVENTS CONCERNING NM SECURITY

    International Nuclear Information System (INIS)

    VALENTE, J.; FISHBONE, L.

    2003-01-01

    In the State Scientific Center of Russian Federation - Institute of Physics and Power Engineering (SSC RF-IPPE, Obninsk), which is under Minatom jurisdiction, the procedures for carrying out emergency physical inventory taking (EPIT) were developed and tested in cooperation with the Brookhaven National Laboratory (USA). Here the emergency physical inventory taking means the PIT, which is carried out in case of symptoms indicating a possibility of NM loss (theft). Such PIT often requires a verification of attributes and quantitative characteristics for all the NM items located in a specific Material Balance Area (MBA). In order to carry out the exercise, an MBA was selected where many thousands of NM items containing highly enriched uranium are used. Three clients of the computerized material accounting system (CMAS) are installed in this MBA. Labels with unique (within IPPE site) identification numbers in the form of digit combinations and an appropriate bar code have been applied on the NM items, containers and authorized locations. All the data to be checked during the EPIT are stored in the CMAS database. Five variants of anomalies initiating EPIT and requiring different types of activities on EPIT organization are considered. Automatic working places (AWP) were created on the basis of the client computers in order to carry out a large number of measurements within a reasonable time. In addition to a CMAS client computer, the main components of an AWP include a bar-code reader, an electronic scale and an enrichment meter with NaI--detector--the lMCA Inspector (manufactured by the Canberra Company). All these devices work together with a client computer in the on-line mode. Special computer code (Emergency Inventory Software-EIS) was developed. All the algorithms of interaction between the operator and the system, as well as algorithms of data exchange during the measurements and data comparison, are implemented in this software. Registration of detected

  1. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    Science.gov (United States)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  2. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  4. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  5. Developing Ultra-small Scale Mechanical Testing Methods and Microstructural Investigation Procedures for Irradiated Materials

    Energy Technology Data Exchange (ETDEWEB)

    Hosemann, Peter; Kaoumi, Djamel

    2018-04-02

    Nuclear materials are an essential aspect of nuclear engineering. While great effort is spent on designing more advanced reactors or enhancing a reactor’s safety, materials have been the bottleneck of most new developments. The designs of new reactor concepts are driven by neutronic and thermodynamic aspects, leading to unusual coolants (liquid metal, liquid salt, gases), higher temperatures, and higher radiation doses than conventional light water reactors have. However, any (nuclear) engineering design must consider the materials used in the anticipated application in order to ever be realized. Designs which may look easy, simple and efficient considering thermodynamics or neutronic aspects can show their true difficulty in the materials area, which then prevents them from being deployed. In turn, the materials available are influencing the neutronic and thermodynamic designs and therefore must be considered from the beginning, requiring close collaborations between different aspects of nuclear engineering. If a particular design requires new materials, the licensing of the reactor must be considered, but licensing can be a costly and time consuming process that results in long lead times to realize true materials innovation. Extensive materials evaluation and irradiation campaigns need to be conducted in order to introduce a new material in a nuclear system. For licensing purposes, standard materials testing is key. However, basic scientific studies on new materials or even already used materials have the potential to accelerate the process of materials development or foster predictability of materials that are already in service and therefore are essential in order not to face difficulties later in the development or service stage. Therefore a combination of engineering scale materials evaluation as well as basic scientific understanding of the materials property changes under service condition is key to address potential issues in the process. Ion

  6. Facilities and procedures used for the performance testing of DOE personnel dosimetry systems

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for /sup 137/Cs, several beta-particle emitters, /sup 252/Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate.

  7. Facilities and procedures used for the performance testing of DOE personnel-dosimetry systems

    International Nuclear Information System (INIS)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for 137 Cs, several beta-particle emitters, 252 Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate

  8. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation. The scope of this test procedure is to validate the operation of FRS and IWTS components as a complete system. Fuel canisters shall be processed in accordance with this test procedure such that fuel inspection results are clearly attributed to a particular set of PCM operating parameters. The Phase 3 test sequence processes a minimum of six canisters. Twenty-four contingency canisters have been identified, and will be processed if additional performance data are required. The Phase 4 test sequence processes a minimum of 29 specific canisters. Twenty-nine contingency canisters have been identified for Phase 4 activities and will be processed to complete process validation, if

  9. Methods for testing the logical structure of plant procedure documents

    International Nuclear Information System (INIS)

    Horne, C.P.; Colley, R.; Fahley, J.M.

    1990-01-01

    This paper describes an ongoing EPRI project to investigate computer based methods to improve the development, maintenance, and verification of plant operating procedures. This project began as an evaluation of the applicability of structured software analysis methods to operating procedures. It was found that these methods offer benefits, if procedures are transformed to a structured representation to make them amenable to computer analysis. The next task was to investigate methods to transform procedures into a structured representation. The use of natural language techniques to read and compile the procedure documents appears to be viable for this purpose and supports conformity to guidelines. The final task was to consider possibilities of automated verification methods for procedures. Methods to help verify procedures were defined and information requirements specified. These methods take the structured representation of procedures as input. The software system being constructed in this project is called PASS, standing for Procedures Analysis Software System

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  19. A review on test procedure, energy efficiency standards and energy labels for room air conditioners and refrigerator-freezers

    Energy Technology Data Exchange (ETDEWEB)

    Mahlia, T.M.I.; Saidur, R. [Department of Mechanical Engineering, University of Malaya, 50603 Kuala Lumpur (Malaysia)

    2010-09-15

    Air conditioners and refrigerator-freezers are major energy users in a household environment and hence efficiency improvement of these appliances can be considered as an important step to reduce their energy consumption along with environmental pollution prevention. Energy efficiency standards and labels are commonly used tools to reduce the energy uses for household appliances for many countries around the world. The first step towards adopting energy efficiency standards is to establish a test procedure for rating and testing of an appliance. It may be mentioned that an energy test procedure is the technical foundation for energy efficiency standards, energy labels, and other related programs. This paper reviews requirements and specifications of various international test standards for testing and rating of room air conditioners and refrigerators. A review on the development of the energy efficiency standards has been provided as well. Finally, energy labels that provide some useful information for identifying energy efficient products have been reviewed for these appliances. It may be stated that the review will be useful for the developing countries who wish to develop these energy savings strategies. It is also expected to be useful to revise the existing strategies for a few selected countries who already implemented these strategies earlier. (author)

  20. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  1. The minimal ice water caloric test compared with established vestibular caloric test procedures.

    Science.gov (United States)

    Schmäl, Frank; Lübben, Björn; Weiberg, Kerstin; Stoll, Wolfgang

    2005-01-01

    Caloric testing of the vestibular labyrinth is usually performed by classical caloric test procedures (CCTP) using water warmed to 30 degrees C and 44 degrees C. Ice water irrigation (4 degrees C) is usually not performed, although it might be useful as a bedside test. To verify the validity of the Minimal Ice Water Caloric Test (MIWCT), comparative video-oculographic investigations were performed in 22 healthy subjects using ice water (0.5 ml, 1.0 ml, 2 ml), CCTP, and cold air (27 degrees C). Frequency, amplitude, slow phase velocity (SPV), the onset, and the duration of nystagmus were documented. After addition of three ice cubes, the temperature of conventional tap water (16 degrees C) fell within 13 min to 4 degrees C. In pessimum position the subjects demonstrated no nystagmus response. Compared to CCTP, MIWCT was associated with a significantly later onset of nystagmus and a significant prolongation of the nystagmus reaction. In contrast to air stimulation (27 degrees C), a significant Spearman's correlation was noted between MIWCT (1 and 2 ml) and established CCTP in respect of essential nystagmus parameters (frequency, amplitude and SPV). Furthermore, MIWCT (0.5 and 1 ml) showed a higher sensitivity and specificity with regard to the detection of canal paresis based on Jongkees' formula compared to stimulation with air 27 degrees C. Thus, MIWCT appears to be a suitable procedure for bedside investigation of vestibular function outside the vestibular laboratory, e.g. in a hospital ward, where bedridden patients with vertigo occasionally require vestibular testing.

  2. Memory and other properties of multiple test procedures generated by entangled graphs.

    Science.gov (United States)

    Maurer, Willi; Bretz, Frank

    2013-05-10

    Methods for addressing multiplicity in clinical trials have attracted much attention during the past 20 years. They include the investigation of new classes of multiple test procedures, such as fixed sequence, fallback and gatekeeping procedures. More recently, sequentially rejective graphical test procedures have been introduced to construct and visualize complex multiple test strategies. These methods propagate the local significance level of a rejected null hypothesis to not-yet rejected hypotheses. In the graph defining the test procedure, hypotheses together with their local significance levels are represented by weighted vertices and the propagation rule by weighted directed edges. An algorithm provides the rules for updating the local significance levels and the transition weights after rejecting an individual hypothesis. These graphical procedures have no memory in the sense that the origin of the propagated significance level is ignored in subsequent iterations. However, in some clinical trial applications, memory is desirable to reflect the underlying dependence structure of the study objectives. In such cases, it would allow the further propagation of significance levels to be dependent on their origin and thus reflect the grouped parent-descendant structures of the hypotheses. We will give examples of such situations and show how to induce memory and other properties by convex combination of several individual graphs. The resulting entangled graphs provide an intuitive way to represent the underlying relative importance relationships between the hypotheses, are as easy to perform as the original individual graphs, remain sequentially rejective and control the familywise error rate in the strong sense. Copyright © 2012 John Wiley & Sons, Ltd.

  3. Development of the transverse tensile and fracture toughness test techniques for spent fuel cladding

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, S. B.; Hong, K. P.; Jung, Y. H.; Seo, H. S.; Oh, W. H.; Yoo, B. O.; Kim, D. S.; Seo, K. S

    2001-12-01

    To define the cause of cladding damage which can take place during the operation of nuclear power plant and the storage through the degradation aspect of mechanical characteristics, the transverse tensile an fracture toughness test were developed in hot cell at IMEF(Irradiated Material Experiment Facility). The following hot cell techniques were developed. 1. The development of a jig and a specimen for transverse tensile test 2. The acquisition of a manufacturing technique for the transverse tensile specimen at hot cell 3. The acquisition of testing procedures and an analysis technque for the transverse tensile 4. The dimensional determination of an optimized fracture toughness specimen 5. The acquisition of manufacturing technique for the fracture toughness test specimen at the hot cell 6. The acquisition of testing procedures and analysis technique for the fracture toughness test (Multiple specimen method, DCPD method, Load ratio method)

  4. 16 CFR 1501.4 - Size requirements and test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Size requirements and test procedure. 1501.4 Section 1501.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT.... The metric approximations are included only for convenience.) (b)(1) Place the article, without...

  5. Test procedures and instructions for Hanford tank waste supernatant cesium removal

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

  6. A Bayesian decision procedure for testing multiple hypotheses in DNA microarray experiments.

    Science.gov (United States)

    Gómez-Villegas, Miguel A; Salazar, Isabel; Sanz, Luis

    2014-02-01

    DNA microarray experiments require the use of multiple hypothesis testing procedures because thousands of hypotheses are simultaneously tested. We deal with this problem from a Bayesian decision theory perspective. We propose a decision criterion based on an estimation of the number of false null hypotheses (FNH), taking as an error measure the proportion of the posterior expected number of false positives with respect to the estimated number of true null hypotheses. The methodology is applied to a Gaussian model when testing bilateral hypotheses. The procedure is illustrated with both simulated and real data examples and the results are compared to those obtained by the Bayes rule when an additive loss function is considered for each joint action and the generalized loss 0-1 function for each individual action. Our procedure significantly reduced the percentage of false negatives whereas the percentage of false positives remains at an acceptable level.

  7. Wellbore inertial navigation system (WINS) software development and test results

    Energy Technology Data Exchange (ETDEWEB)

    Wardlaw, R. Jr.

    1982-09-01

    The structure and operation of the real-time software developed for the Wellbore Inertial Navigation System (WINS) application are described. The procedure and results of a field test held in a 7000-ft well in the Nevada Test Site are discussed. Calibration and instrumentation error compensation are outlined, as are design improvement areas requiring further test and development. Notes on Kalman filtering and complete program listings of the real-time software are included in the Appendices. Reference is made to a companion document which describes the downhole instrumentation package.

  8. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  9. 75 FR 42611 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... current active mode provisions in its test procedure for microwave ovens do not produce accurate and... concerns with the DOE microwave oven cooking efficiency test procedure. Elsewhere in today's Federal...

  10. Development of maintenance procedure for plate type heat exchanger taking into account preventing radioactive contamination

    International Nuclear Information System (INIS)

    Terai, Kensuke; Someki, Hiroyuki; Ueda, Yuya

    2017-01-01

    In Japanese pressurized water reactors (PWR), heat loads of spent fuel pools (SFP) is increasing due to rising spent fuels and use of mixed oxide (MOX) fuels. Therefore, SFP cooling capacities are necessary to be enhanced, and replacement of SFP coolers or installation of additional coolers is needed. On the other hand, installation spaces of SFP coolers are limited in existing buildings. Therefore, plate type heat exchangers which can be designed to be compact because of the high heat efficiency have often been adopted for SFP coolers instead of shell and tube type heat exchangers in general use. Plate type heat exchangers have to be overhauled periodically for inspection and gasket replacement. However, in plate type SFP coolers, radioactive SFP water and non-radioactive component cooling water (CCW) alternately run through between each plate. Thus there is a concern that the CCW system may be contaminated by radioactive materials from the SFP water during overhaul of the SFP cooler. In order to solve this problem, we have developed the maintenance procedure of the plate type SFP coolers to prevent CCW side contamination by coating the contaminated surfaces with strippable paint prior to disassembly. Before applying this developed maintenance procedure to actual equipment, we have performed the following verification tests. (1) Confirmation of fundamental characteristics for strippable paint. Firstly, we selected both water-based and solvent-based strippable paints. Secondly, we tested and confirmed the detachability and the drying time of the selected strippable paints respectively. Moreover we also confirmed that the selected strippable paints are appropriate materials from the viewpoint of chemical composition restriction of consumable materials used in nuclear power plant. (2) Confirmation of workability for paint filling, drying and peeling off. The strippable paints need to be peeled off after filling into plate type heat exchanger and draining

  11. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  12. Development of a dual test procedure for DNA typing and methamphetamine detection using a trace amount of stimulant-containing blood.

    Science.gov (United States)

    Irii, Toshiaki; Maebashi, Kyoko; Fukui, Kenji; Sohma, Ryoko; Matsumoto, Sari; Takasu, Shojiro; Iwadate, Kimiharu

    2016-05-01

    Investigation of drug-related crimes, such as violation of the Stimulant Drug Control Law, requires identifying the used drug (mainly stimulant drugs, methamphetamine hydrochloride) from a drug solution and the DNA type of the drug user from a trace of blood left in the syringe used to inject the drug. In current standard test procedures, DNA typing and methamphetamine detection are performed as independent tests that use two separate portions of a precious sample. The sample can be entirely used up by either analysis. Therefore, we developed a new procedure involving partial lysis of a stimulant-containing blood sample followed by separation of the lysate into a precipitate for DNA typing and a liquid-phase fraction for methamphetamine detection. The method enables these two tests to be run in parallel using a single portion of sample. Samples were prepared by adding methamphetamine hydrochloride water solution to blood. Samples were lysed with Proteinase K in PBS at 56°C for 20min, cooled at -20°C after adding methanol, and then centrifuged at 15,000rpm. Based on the biopolymer-precipitating ability of alcohol, the precipitate was used for DNA typing and the liquid-phase fraction for methamphetamine detection. For DNA typing, the precipitate was dissolved and DNA was extracted, quantified, and subjected to STR analysis using the AmpFℓSTR® Identifiler® Plus PCR Amplification Kit. For methamphetamine detection, the liquid-phase fraction was evaporated with N2 gas after adding 20μL acetic acid and passed through an extraction column; the substances captured in the column were eluted with a solvent, derivatized, and quantitatively detected using gas chromatograph/mass spectrometry. This method was simple and could be completed in approximately 2h. Both DNA typing and methamphetamine detection were possible, which suggests that this method may be valuable for use in criminal investigations. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  13. Development of new test procedures for measuring fine and coarse aggregates specific gravity.

    Science.gov (United States)

    2009-09-01

    The objective of the research is to develop and evaluate new test methods at determining the specific gravity and absorption of both fine and coarse aggregates. Current methods at determining the specific gravity and absorption of fine and coarse agg...

  14. 75 FR 42612 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy... (NOPR) in which DOE proposed test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to measure standby mode and off mode power use by microwave ovens. To address issues...

  15. 40 CFR 1051.501 - What procedures must I use to test my vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... vehicles or engines? 1051.501 Section 1051.501 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test Procedures § 1051.501 What procedures must I use to test my vehicles or engines? This section describes test...

  16. Emission of biocides from treated materials: test procedures for water and air.

    Science.gov (United States)

    Schoknecht, Ute; Wegner, Robby; Horn, Wolfgang; Jann, Oliver

    2003-01-01

    Methods for the determination of biocide emissions from treated materials into water and air were developed and tested in order to support a comparative ecological assessment of biocidal products. Leaching tests, experiments with simulated rain, extraction cleaning of carpets and emission chamber tests were performed with a series of treated materials. The experiments focused on the effect of changes in the procedure as well as characteristics of the specimens and demonstrate the suitability of the proposed methods for biocides of different product types. It was demonstrated that emissions of biocides into water can be compared on the basis of leaching tests in which the emission kinetics of the active ingredients are recorded. However, the water volume per surface area and the timetable for water changes have to be defined in such tests. Functions of flux rates related to time can be well described for inorganic compounds, whereas modelling of the data is more complicated for organic substances. Emission chamber tests using 20-litre and 23-litre glass exsiccators, originally developed to study volatile organic compounds, were successfully adapted for the investigation of the emission of biocides from treated materials which are usually semi volatile organic compounds. However test parameters and the method of analysis have to be adapted to the substances to be determined. Generally, it was found that the emission curves for the semi volatile organic compounds investigated differ from those of volatile organic compounds.

  17. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  18. A software prototype development of human system interfaces for human factors engineering validation tests of SMART MCR

    International Nuclear Information System (INIS)

    Lim, Jong Tae; Han, Kwan Ho; Yang, Seung Won

    2011-02-01

    An integrated system validation test bed used for human factors engineering validation test is being developed. This study has a goal to develop a software prototype for HFE validation of SMART MCR design. To achieve these, first, some prototype specifications of the software was developed. Then software prototypes of alarm reduction logic system, Plant Protection System, ESF-CCS, Elastic Tile Alarm Indication, and EID-based HSIs were implemented as codes. Test procedures for the software prototypes were established to verify the completeness of the codes implemented. The careful software test has been done according to these test procedures, and the result were documented

  19. Development of Final Running Test System for Digital Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed.

  20. Development of Final Running Test System for Digital Systems

    International Nuclear Information System (INIS)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok

    2016-01-01

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed

  1. Development and field test of psychophysical tests for DWI arrest

    Science.gov (United States)

    1981-03-01

    Administration and scoring procedures were standardized for a sobriety test battery consisting of the walk-and-turn test, the one leg stand test, and horizontal gaze nystagmus. The effectiveness of the standardized battery was then evaluated in the l...

  2. 76 FR 12825 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2011-03-09

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy.... Department of Energy (DOE) is amending its test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to provide for the measurement of standby mode and off mode power use by microwave...

  3. Preschooler test or procedure preparation

    Science.gov (United States)

    ... your child during and after the procedure with books, songs, counting, deep breathing, or blowing bubbles. PLAY ... can be present during the procedure. Ask if anesthesia can be used to reduce your child's discomfort. ...

  4. Development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1984-01-01

    Until recently, the formal treatment of control room procedures for upset conditions in nuclear power plants has been event-oriented. This orientation was not so much a reflection of power plant operating practice as it was a reflection of design-oriented thinking - design-basis events, therefore event-oriented procedures. Event orientation is not common in other professions. In the medical profession, for example, the stabilization of vital functions through a symptoms-oriented approach has priority over diagnosis and prognosis. The American nuclear power industry has initiated programs for the development and application of a symptoms-oriented approach for handling upset conditions. Canadian programs have independently paralleled the US programs. This article describes the rationale and current applications of the Canadian programs and identifies the relevance of a generic symptoms-based emergency procedure to current operating practices

  5. 10 CFR 431.444 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.444 Section 431.444 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... procedures for the measurement of energy efficiency. (a) Scope. Pursuant to section 346(b)(1) of EPCA, this...

  6. 49 CFR 572.124 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... test procedure in paragraph (c) of this section: (1) The maximum sternum displacement (compression... displacement but before reaching the minimum required 38.0 mm (1.5 in) sternum displacement limit shall not exceed 1500 N (337.2 lbf). (2) The internal hysteresis of the ribcage in each impact as determined by the...

  7. PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Geoffrey Wayne [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-03-16

    This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived from APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.

  8. Development of an accelerated leach test(s) for low-level waste forms

    International Nuclear Information System (INIS)

    Dougherty, D.R.; Fuhrmann, M.; Colombo, P.

    1986-01-01

    An accelerated leach test(s) is being developed to predict long-term leaching behavior of low-level radioactive waste (LLW) forms in their disposal environments. As necessary background, a literature survey of reported leaching mechanisms, available mathematical models and factors that affect leaching of LLW forms has been compiled. Mechanisms which have been identified include diffusion, dissolution, ion exchange, corrosion and surface effects. A computerized data base of LLW leaching data and mathematical models is being developed. The data is being used for model evaluation by curve fitting and statistical analysis according to standard procedures of statistical quality control. Long-term leach tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms. Initial results on the effect of temperature on leachability indicate that the leach rates of cement and VES waste forms increase with increasing temperature, whereas, the leach rate of bitumen is little affected

  9. Statistical approach for collaborative tests, reference material certification procedures

    International Nuclear Information System (INIS)

    Fangmeyer, H.; Haemers, L.; Larisse, J.

    1977-01-01

    The first part introduces the different aspects in organizing and executing intercomparison tests of chemical or physical quantities. It follows a description of a statistical procedure to handle the data collected in a circular analysis. Finally, an example demonstrates how the tool can be applied and which conclusion can be drawn of the results obtained

  10. A procedure for the significance testing of unmodeled errors in GNSS observations

    Science.gov (United States)

    Li, Bofeng; Zhang, Zhetao; Shen, Yunzhong; Yang, Ling

    2018-01-01

    It is a crucial task to establish a precise mathematical model for global navigation satellite system (GNSS) observations in precise positioning. Due to the spatiotemporal complexity of, and limited knowledge on, systematic errors in GNSS observations, some residual systematic errors would inevitably remain even after corrected with empirical model and parameterization. These residual systematic errors are referred to as unmodeled errors. However, most of the existing studies mainly focus on handling the systematic errors that can be properly modeled and then simply ignore the unmodeled errors that may actually exist. To further improve the accuracy and reliability of GNSS applications, such unmodeled errors must be handled especially when they are significant. Therefore, a very first question is how to statistically validate the significance of unmodeled errors. In this research, we will propose a procedure to examine the significance of these unmodeled errors by the combined use of the hypothesis tests. With this testing procedure, three components of unmodeled errors, i.e., the nonstationary signal, stationary signal and white noise, are identified. The procedure is tested by using simulated data and real BeiDou datasets with varying error sources. The results show that the unmodeled errors can be discriminated by our procedure with approximately 90% confidence. The efficiency of the proposed procedure is further reassured by applying the time-domain Allan variance analysis and frequency-domain fast Fourier transform. In summary, the spatiotemporally correlated unmodeled errors are commonly existent in GNSS observations and mainly governed by the residual atmospheric biases and multipath. Their patterns may also be impacted by the receiver.

  11. EFAM GTP 02 - the GKSS test procedure for determining the fracture behaviour of materials

    International Nuclear Information System (INIS)

    Schwalbe, K.H.; Heerens, J.; Zerbst, U.; Kocak, M.

    2002-01-01

    This document describes a unified fracture mechanics test method in procedural form for quasi-static testing of materials. It is based on the ESIS Procedures P1 and P2 and introduces additional features, such as middle cracked tension specimens, shallow cracks, the δ 5 crack tip opening displacement, the crack tip opening angle, the rate of dissipated energy, testing of weldments, and guidance for statistical treatment of scatter. Special validity criteria are given for tests on specimens with low constraint. This document represents an updated version of EFAM GTP 94. (orig.) [de

  12. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  13. Plutonium immobilization project development and testing quality assurance program description - February 1999

    International Nuclear Information System (INIS)

    MacLean, L. M.; Ziemba, J.

    1999-01-01

    Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work

  14. Development of manual procedures for care of pregnant patients in radiotherapy service

    International Nuclear Information System (INIS)

    Scarabino, M.L.; Ruggeri, R.M.; Colombo, S.; Mairal, L.; Sardi, M.E.

    2013-01-01

    The work involves the creation of a manual of procedures for the care of pregnant patients in a radiotherapy center in which each instance of treatment is included, from the obstetrician-oncology comprehensive assessment during admission to establishing controls newborn and its subsequent development in multidisciplinary team. For the preparation of the manual had to design an anthropomorphic phantom that resembles a pregnant woman, which was used to carry out internal and external dosimetry. In turn imparted calculations fetal doses using TPS, imaging tests with MRI, avoiding the use of the tomograph and adapted to the resonator involved were carried immobilizer. All experiences and progress made during the treated cases are introduced in the procedures manual, making it a dynamic tool for continuous improvement for the institution

  15. Developing operating procedures for a low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  16. Developing operating procedures for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures

  17. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  18. Equating Multidimensional Tests under a Random Groups Design: A Comparison of Various Equating Procedures

    Science.gov (United States)

    Lee, Eunjung

    2013-01-01

    The purpose of this research was to compare the equating performance of various equating procedures for the multidimensional tests. To examine the various equating procedures, simulated data sets were used that were generated based on a multidimensional item response theory (MIRT) framework. Various equating procedures were examined, including…

  19. 77 FR 28673 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans

    Science.gov (United States)

    2012-05-15

    ... multipliers based on climate, consumer behavior assumptions, and product characteristics (e.g., multi-stage or... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans; Proposed Rule #0;#0... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans AGENCY: Office of...

  20. Planning, developing, and fielding of thermal/structural interactions in situ tests for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Munson, D.E.; Matalucci, R.V.

    1986-01-01

    Large-scale, well-instrumented underground tests to determine in situ thermal/structural response of bedded salt are being constructed in the WIPP facility in southeastern New Mexico. These tests are an essential component of a broad research and development program to resolve thermal/structural issues, to validate long-term prediction methods, and to develop a design basis for a future repository. They are the result of an extensive planning and evaluation procedure to determine the appropriate test configuration. All details of the tests, including background, decisions, design, site operations, and testing organization are explained. These procedures may be useful in developing other in situ tests

  1. Development of ISA procedure for uranium fuel fabrication and enrichment facilities: overview of ISA procedure and its application

    International Nuclear Information System (INIS)

    Yamate, Kazuki; Yamada, Takashi; Takanashi, Mitsuhiro; Sasaki, Noriaki

    2013-01-01

    Integrated Safety Analysis (ISA) procedure for uranium fuel fabrication and enrichment facilities has been developed for aiming at applying risk-informed regulation to these uranium facilities. The development has carried out referring to the ISA (NUREG-1520) by the Nuclear Regulatory Commission (NRC). The paper presents purpose, principles and activities for the development of the ISA procedure, including Risk Level (RL) matrix and grading evaluation method of IROFS (Items Relied on for Safety), as well as general description and features of the procedure. Also described in the paper is current status in application of risk information from the ISA. Japanese four licensees of the uranium facilities have been conducting ISA for their representative processes using the developed procedure as their voluntary safety activities. They have been accumulating experiences and knowledge on the ISA procedure and risk information through the field activities. NISA (Nuclear and Industrial Safety Agency) and JNES (Japan Nuclear Energy Safety Organization) are studying how to use such risk information for the safety regulation of the uranium facilities, taking into account the licensees' experiences and knowledge. (authors)

  2. Research on Operating Procedure Development in View of RCM Theory

    International Nuclear Information System (INIS)

    Shi, J.

    2015-01-01

    The operation of NPPs (nuclear power plants) is closely related to SSCs (Structure, System and Component) function implementations and failure recoveries, and strictly follows operating procedure. The philosophy of RCM (Reliability Centered Maintenance) which is a widely-used systematic engineering approach in industry focusing on likewise facility functions and effectiveness of maintenance is accepted in relative analysis of NPPs operation in this paper. Based on the theory of RCM, the paper will discuss general logic of operating procedure development and framework optimization as well combining NPPs engineering design. Since the quality of operating procedures has a significant impact on the safe and reliable operation of NPPs, the paper provides a proposed operating procedure development logic diagramme for reference for the procedure optimization task ahead. (author)

  3. Procedure and layout for the development of a fatigue test on an agricultural implement by a four poster test bench

    Directory of Open Access Journals (Sweden)

    M. Cutini

    2013-09-01

    Full Text Available The increasing demand in agricultural vehicles’ power requirements, payloads and driving speeds increases issues related to tractors and farm implements exposure to solicitations. One of the main factors to be taken into account for fatigue test developing on agricultural machines is the heterogeneity of the environment and activity in which the tractor operates. In particular, for contractors the use in transport conditions both on terrain and road becomes important. As far as transport is concerned. factors mainly affecting solicitations on carried implement are soil profile roughness, tractor settings and forward speed. In this paper, CRA-ING laboratory of Treviglio, Italy, together with Frandent Group s.r.l. (Osasco, Italy, analyse the possibility of creating a solicitation profile by means of one four poster test bench for fatigue test on a carried implement simulating transport conditions. Accelerations at the hubs of the tractor were acquired during transport on terrain and reproduced with one electro-hydraulic four posters test bench on one dummy of a tractor developed for carrying the implement. Artificial bumps were mathematically created and introduced in the time history to simulate squares solicitations. Twelve hours of test were carried out. This experience confirmed the possibility of carrying out laboratory fatigue test on agricultural implements by reproducing specific field conditions solicitations with four poster test bench.

  4. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  6. Dispersant field testing : a review of procedures and considerations

    International Nuclear Information System (INIS)

    Fingas, M.F.

    2004-01-01

    The effectiveness of a dispersant is defined by the amount of oil that the dispersant puts into the water column compared to the amount of oil that was initially spilled. Effectiveness is generally determined visually in plumes of dispersed oil that are visible from ships and aircraft. This paper describes 25 specific issues and technical concerns regarding field testing of dispersant effectiveness. Recent field tests were reviewed and literature that relates to testing procedures was sited. The 25 factors that are important for the appropriate outcome of dispersant field experiments include: mass balance; proper controls; analytical method; differential plume movement; time lag and length of time followed; mathematics of calculation and integration; lower and upper limits of analytical methods; use of remote sensing; thickness measurement; behaviour of oil with surfactant content; surfactant stripping; tracking surface oil and dispersed oil; recovering surface oil; visibility of oil from the surface; background levels of hydrocarbons; fluorescence of dispersant; herding; emulsion breaking; application success; heterogeneity of slick and plume; deposition measurements; true analytical standards; effect of wind on dispersant and slick; dispersant run-off; and weathering of the oil. It was concluded that the most important factors are the ability to determine mass balance, use proper controls, analytical methods and to avoid procedures that give incorrect results. 34 refs., 4 tabs., 1 fig

  7. Communication with patients during the prenatal testing procedure: an explorative qualitative study

    NARCIS (Netherlands)

    van Zwieten, Myra; Willems, Dick; Knegt, Lia; Leschot, Nico

    2006-01-01

    OBJECTIVE: While generally two phases of prenatal genetic counseling are distinguished, i.e. pre- and post-test counseling, we revealed a third form of communication during the testing procedure. The content of this intermediate communication was explored. METHODS: A secondary analysis was performed

  8. Alternative procedure for the cold test for soybean seeds Procedimento alternativo para o teste de frio em semente de soja

    Directory of Open Access Journals (Sweden)

    Bruno Guilherme Torres Licursi Vieira

    2010-10-01

    Full Text Available The growing demand for high quality soybean [Glycine max (L. Merrill] seeds requires a precise seed quality control system from the seed industry. One way to accomplish this is by improving vigor testing. Cold test has been traditionally employed for corn seeds. However, it has also been used for other seed crops such as cotton (Gossypium spp., soybean (Glycine Max, dry bean (Phaseolus vulgaris and pea (Pisum sativum. This study was carried out with the objective of adjusting an alternative procedure for the cold test to determine soybean seed vigor. Six commercial soybean seed lots of the cultivar BRS 133 were used. The physiological potential of the seed lots was evaluated by germination on paper towel and sand box, seedling field emergence, tetrazolium, accelerated aging and electrical conductivity tests. Seed moisture content was also determined. The temperature used for the cold test procedures was 10ºC during five days. Four cold test procedures were evaluated: i plastic boxes with soil; ii rolled paper towel with soil; iii rolled paper towel without soil, and iv an alternative procedure, using rolled paper towel without soil under cold water. A completely randomized experimental design with eight replications was used and the means were compared by the Tukey test (p = 0.05. To verify the dependence between the alternative test and others single linear correlation was used. All cold test procedures had similar coefficients of variation (CV, highlighting that rolled paper towel with soil and the alternative procedure had the best performance, with an average of 94% and 93% normal seedlings and CV of 3.2% and 3.6%, respectively. The alternative procedure has satisfactory results for estimating soybean seed vigor, yielding consistent results compared to the traditional procedure.A crescente demanda por semente de soja [Glycine max (L. Merrill] de alta qualidade tem requerido da indústria de sementes um controle de qualidade mais preciso

  9. Performance testing of HEPA filters: Progress towards a European standard procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  10. CENER/NREL Collaboration in Testing Facility and Code Development: Cooperative Research and Development Final Report, CRADA Number CRD-06-207

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, P.

    2014-11-01

    Under the funds-in CRADA agreement, NREL and CENER will collaborate in the areas of blade and drivetrain testing facility development and code development. The project shall include NREL assisting in the review and instruction necessary to assist in commissioning the new CENER blade test and drivetrain test facilities. In addition, training will be provided by allowing CENER testing staff to observe testing and operating procedures at the NREL blade test and drivetrain test facilities. CENER and NREL will exchange blade and drivetrain facility and equipment design and performance information. The project shall also include exchanging expertise in code development and data to validate numerous computational codes.

  11. 40 CFR 63.1365 - Test methods and initial compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... permit limit applicable to the process vent. (D) Design analysis based on accepted chemical engineering... concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design... procedures specified in Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical...

  12. 75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD64 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... required method. However, in response to comments requesting additional flexibility in testing methods, the... may increase flexibility and lower costs for employers who choose to use them over more expensive...

  13. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  14. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ''1/0 MODULE HEALTH STATUS'', ''MININ1'', and ''MININ2'' screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure

  15. Development of an accelerated leach test(s) for low-level waste forms

    International Nuclear Information System (INIS)

    Dougherty, D.R.; Fuhrmann, M.; Colombo, P.

    1985-01-01

    An accelerated leach test(s) is being developed to predict long-term leaching behavior of low-level radioactive waste (LLW) forms in their disposal environments. As necessary background, a literature survey of reported leaching mechanisms, available mathematical models and factors that affect leaching of LLW forms has been compiled. Mechanisms which have been identified include diffusion, dissolution, ion exchange, corrosion and surface effects. A computerized data base of LLW leaching data and mathematical models is being developed. The data is being used for model evaluation by curve fitting and statistical analysis according to standard procedures of statistical quality control. Long-term leach tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms. Initial results on the effect of temperature on leachability indicate that the leach rates of cement and VES waste forms increase with increasing temperature, whereas, the leach rate of bitumen is little affected. 10 refs., 5 figs

  16. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  17. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  18. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    International Nuclear Information System (INIS)

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information

  19. 77 FR 28519 - Test Procedure Guidance for Room Air Conditioners, Residential Dishwashers, and Residential...

    Science.gov (United States)

    2012-05-15

    ... Guidance for Room Air Conditioners, Residential Dishwashers, and Residential Clothes Washers: Public... procedures for room air conditioners, residential dishwashers, and residential clothes washers. DATES: DOE...'s existing test procedures for residential room air conditioners, residential dishwashers, and...

  20. Some Remarks on Foundation Pile Testing Procedures

    Science.gov (United States)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  1. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  2. 76 FR 69869 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2011-11-09

    ... ensure that the test procedure is representative of consumer behavior and repeatable among different test... would not be factored into its energy efficiency rating. This would imply that consumer behavior would... previous section, DOE does not have data to verify how consumers may adjust their behavior based on the...

  3. Standards for radiation protection instrumentation: design of safety standards and testing procedures

    International Nuclear Information System (INIS)

    Meissner, Frank

    2008-01-01

    This paper describes by means of examples the role of safety standards for radiation protection and the testing and qualification procedures. The development and qualification of radiation protection instrumentation is a significant part of the work of TUV NORD SysTec, an independent expert organisation in Germany. The German Nuclear Safety Standards Commission (KTA) establishes regulations in the field of nuclear safety. The examples presented may be of importance for governments and nuclear safety authorities, for nuclear operators and for manufacturers worldwide. They demonstrate the advantage of standards in the design of radiation protection instrumentation for new power plants, in the upgrade of existing instrumentation to nuclear safety standards or in the application of safety standards to newly developed equipment. Furthermore, they show how authorities may proceed when safety standards for radiation protection instrumentation are not yet established or require actualization. (author)

  4. Development of procedure using plasma welding process to produce 125I seeds

    International Nuclear Information System (INIS)

    Feher, Anselmo

    2006-01-01

    The prostate cancer, which is the second cause of death by cancer in men, overcome only by lung cancer, is a problem of public health in Brazil. Brachytherapy is among the possible available treatments for prostate cancer, in which small seeds containing 125 I radioisotope are implanted in the prostate. The seed consists of a titanium sealed capsule with 0.8 mm external diameter and 4.5 mm length, containing a central silver wire with adsorbed 125 I. The plasma arc welding is one of the viable techniques for the sealing process. The equipment used in this technique is less costly than in other processes. The main objective of this work was the development and the validation of the welding procedure using plasma welding process and the elaboration of a sealing routine according to Good Manufacturing Practices. The development of this work has presented the following phases: cut and cleaning of the titanium material, determination of the welding parameters, development of a device for holding the titanium tube during the welding process, validation of sealed sources according to ISO 2919 Sealed Radioactive Sources - General Requirements and Classification, leakage test according to ISO 9978 Sealed Radioactive Sources - Leakage Test Methods and metallographic assays. The developed procedure, to seal 125 I seeds using plasma welding process, has shown to be efficient, satisfying all the established requirements of ISO 2919. The results obtained in this work have given the possibility to establish a routine production process according to the orientations presented in resolution RDC number 59 - Good Manufacturing Practices do Medical Products of the ANVISA - Brazilian Nacional Agency of Sanitary Surveillance. (author)

  5. The ORGA test: Development of a testing procedure for a practical evaluation of the fermenter biology and NaWaRo biogas plants; Der ORGA-Test. Entwicklung eines Testverfahrens zur praxisnahen Beurteilung der Fermenterbiologie von NaWaRo-Biogasanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Engler, Nils; Nelles, Michael [Rostock Univ. (Germany). Lehrstuhl fuer Abfall- und Stoffstromwirtschaft; Merretig-Bruns, Ute [Fraunhofer Institut fuer Umwelt-, Sicherheits- und Energietechnik UMSICHT, Oberhausen (Germany); Feher, Adam [HAWK Fachhochschule Goettingen (Germany). Fachgebiet NEUTec; Fritz, Thomas [Schaumann Biotic Consult GmbH, Pinneberg (Germany)

    2010-07-01

    The Oberhausen-Rostock-Goettingen activity test (ORGA test) enables a comparative quantification of the biological activity of biogas fermenters. At this, fermenter samples of biological gas facilities are submitted to a standardised test routine, and the kinetics of degradation of a standardised, reproducible substrate in high temporal resolution is investigated. In a parallel experiment, the influence by fermentation aiding substances or potential inhibitors on kinetics of degradation can be investigated. The Gas Production System of the company ANKOM is the technical equipment for this test procedure. The procedure is based on the measurement of the increase of pressure in a constant volume at a constant temperature. With the presently existing equipment a zero-attempt, control and up to six variants of additives can be performed in three-fold repetition. Time criteria such as the t{sub 5}0 value are well manageable quantities for the comparison of different fermenter samples.

  6. 77 FR 31443 - Energy Conservation Program: Test Procedures for Residential Dishwashers, Dehumidifiers, and...

    Science.gov (United States)

    2012-05-25

    ... an ion exchange to remove calcium and magnesium ions from the water, by swapping sodium ions bonded... addresses energy and water use associated with dishwasher water softeners, the energy test cycle for... dehumidifier test procedure, eliminate measurement of gas pilot light energy use in the cooking products test...

  7. Hanford spent nuclear fuel cold vacuum drying proof of performance test procedure

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1998-01-01

    This document provides the test procedure for cold testing of the first article skids for the Cold Vacuum Drying (CVD) process at the Facility. The primary objective of this testing is to confirm design choices and provide data for the initial start-up parameters for the process. The current scope of testing in this document includes design verification, drying cycle determination equipment performance testing of the CVD process and MCC components, heat up and cool-down cycle determination, and thermal model validation

  8. Free Flight Rotorcraft Flight Test Vehicle Technology Development

    Science.gov (United States)

    Hodges, W. Todd; Walker, Gregory W.

    1994-01-01

    A rotary wing, unmanned air vehicle (UAV) is being developed as a research tool at the NASA Langley Research Center by the U.S. Army and NASA. This development program is intended to provide the rotorcraft research community an intermediate step between rotorcraft wind tunnel testing and full scale manned flight testing. The technologies under development for this vehicle are: adaptive electronic flight control systems incorporating artificial intelligence (AI) techniques, small-light weight sophisticated sensors, advanced telepresence-telerobotics systems and rotary wing UAV operational procedures. This paper briefly describes the system's requirements and the techniques used to integrate the various technologies to meet these requirements. The paper also discusses the status of the development effort. In addition to the original aeromechanics research mission, the technology development effort has generated a great deal of interest in the UAV community for related spin-off applications, as briefly described at the end of the paper. In some cases the technologies under development in the free flight program are critical to the ability to perform some applications.

  9. Vaspar broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria.

    OpenAIRE

    West, S E; Wilkins, T D

    1980-01-01

    A modification of the Wilkins-Thiel broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria is described. This method utilizes an aerobically prepared medium overlaid with molten vaspar. Specialized anaerobic techniques or prereduced media are not required.

  10. Safety assessment by Euro NCAP - objective test procedures instead of subjective inspection; Die Sicherheitsbewertung durch Euro NCAP - objektive Testverfahren statt subjektiver Fahrzeuginspektion

    Energy Technology Data Exchange (ETDEWEB)

    Seeck, A. [Bundesanstalt fuer Strassenwesen, Bergisch Gladbach (Germany); Klanner, W. [ADAC Technik Zentrum Landsberg (Germany)

    2001-07-01

    Development of objective testing procedures which may be able to replace subjective inspection of a vehicle following a crash test ist being pursued by Euro NCAP to an increasing degree. Three examples were given to show the capabilities as well as the difficulties connected with description of objective criteria and test procedures. Airbag bottoming-out was described pragmatically and clearly with the aid of criteria based on acceleration measurements in the head of the dummy. These criteria could therefore already be taken into consideration in development and layout of airbags. Practical testing at Euro NCAP has shown that head side airbags can provide considerably different protective effects in terms of accident reality during pole side impact and that these effects cannot always be recorded and differentiated using the evaluation criteria defined to date. For this reason extended and new evaluation criteria have been defined which allow differentiation of such systems. However, it was also found that marginal situations can occur which are difficult to evaluate. However, since such marginal situations can be described, it should be possible for automobile manufacturers in the future to design a system which is no longer devaluated by a modifier in cases of doubt. Evaluation of the knee impact area on the dashboard has probably caused the greatest criticism from the automotive industry to date regarding subjective inspection within the scope of Euro NCAP evaluation. A new committee from Euro NCAP is presently making efforts to define an objective test procedure with which modifiers resulting from the inspection can be refuted subsequently where applicable. However, since the knee mapping situation is very complex, it will probably not be possible to find an absolutely correct test procedure. On the contrary, a pragmatic procedure will probably be found which can then supply objective and comparable readings. This would then provide a testing method which would

  11. Testing the applicability of the SASS5 scoring procedure for ...

    African Journals Online (AJOL)

    A study was undertaken between 29th January and 17th February 2004 to test the applicability of the South African Scoring System Version 5 (SASS5) scoring and calculation procedure in nutrient-enriched palustrine wetlands in the midlands of KwaZulu-Natal, South Africa. Four reference wetlands and three dairy-effluent ...

  12. Test procedures and instructions for Hanford complexant concentrate supernatant cesium removal using CST

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W.

    1997-01-08

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Complexant Concentrate supernatant liquor from tank 241-AN-107, in a bench-scale column. The cesium sorbent to be tested is crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-023, Hanford Complexant Concentrate Supernatant Cesium Removal Test Plan.

  13. Set-up and Test Procedure for Suction Installation and Uninstallation of Bucket Foundation

    DEFF Research Database (Denmark)

    Koteras, Aleksandra Katarzyna

    This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use of......) and loading frame used for those tests have been already used for axially static and cyclic loading of piles (Thomassen, 2015a) and for axially static and cyclic loading of bucket foundation (Vaitkunaite et al., 2015).......This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use...... of suction under the bucket lid or by applying additional force through the hydraulic piston, forcing the bucket to penetrate into the soil. Tests for uninstallation are performed also with the use of water pressure, as a reverse process to the suction installation. Both installation and uninstallation tests...

  14. A Comparison of Procedures for Content-Sensitive Item Selection in Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1991-01-01

    This simulation investigated two procedures that reduce differences between paper-and-pencil testing and computerized adaptive testing (CAT) by making CAT content sensitive. Results indicate that the price in terms of additional test items of using constrained CAT for content balancing is much smaller than that of using testlets. (SLD)

  15. Development and testing of computer aided start-up procedures for U-235 enrichment separation nozzle cascades

    International Nuclear Information System (INIS)

    Hein, H.; Schuette, R.; Steinhaus, H.

    1978-09-01

    In industrial scale separation nozzle cascades measured data acquisition and process control will be performed by on-line computer systems. To develop the necessary measurement and monitoring techniques, on-line control of the ten stage pilot plant by the WANG 2200 miniature computer system was tested. On-line data processing at the same time has reduced the number of measurements because a large number of operating data which cannot be measured directly can be obtained from a reduced number of measurements by calculation from the material balances in the gas dynamics network of the enrichment cascade. This is performed on-line by means of a cascade monitoring code which produces diagrams of the deviations of major operating parameters from their set values and thus offers to cascade operators an improved picture of the present status of a cascade, thereby facilitating the detection of causes of defects. The graphic representation chosen for this purpose and the performance of the system in practical operation is explained by an example of cascade adjustment and by a few selected examples of cascade fault conditions. Calculation of the quantities derived at all stages from the pressure (po) and concentration (No) readings requires that the individual flow characteristics of the separation nozzles are known. Alos the compressor characteristics have to be determined. Since the monitoring computer in calculating the cascade status utilizes these component characteristics in current enrichment operation, routinely establishing and plotting these two characteristics is also attributed to the computer system (start-up procedures). (orig.) 891 HP [de

  16. 75 FR 14287 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-03-24

    ... uses the same measurement techniques as the existing test procedure. In any rulemaking to amend a test...; and (3) appearing on page 29 of the transcript. \\6\\ Ballast type refers to a grouping of ballasts that... grouping of lamps that have the same length, lumen package, base type, and diameter. In the ongoing...

  17. Computer-Based Procedures for Field Workers in Nuclear Power Plants: Development of a Model of Procedure Usage and Identification of Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Katya Le Blanc; Johanna Oxstrand

    2012-04-01

    The nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. As a step toward the goal of improving procedure use performance, researchers, together with the nuclear industry, have been looking at replacing the current paper-based procedures with computer-based procedure systems. The concept of computer-based procedures is not new by any means; however most research has focused on procedures used in the main control room. Procedures reviewed in these efforts are mainly emergency operating procedures and normal operating procedures. Based on lessons learned for these previous efforts we are now exploring a more unknown application for computer based procedures - field procedures, i.e. procedures used by nuclear equipment operators and maintenance technicians. The Idaho National Laboratory and participants from the U.S. commercial nuclear industry are collaborating in an applied research effort with the objective of developing requirements and specifications for a computer-based procedure system to be used by field workers. The goal is to identify the types of human errors that can be mitigated by using computer-based procedures and how to best design the computer-based procedures to do so. This paper describes the development of a Model of Procedure Use and the qualitative study on which the model is based. The study was conducted in collaboration with four nuclear utilities and five research institutes. During the qualitative study and the model development requirements and for computer-based procedures were identified.

  18. 76 FR 65631 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2011-10-24

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... residential microwave ovens. DOE specifically is seeking information, data, and comments regarding representative and repeatable methods for measuring the energy use of microwave-only ovens and combination...

  19. Models and procedures for interval evaluating the results of control of knowledge in computer systems testing of Navy

    Directory of Open Access Journals (Sweden)

    D. A. Pechnikov

    2018-01-01

    Full Text Available To implement effective military and professional training of Navy specialists, a corresponding educational and material base is needed. As a result of the reduction in the 1990s in the branches of the military-industrial complex developing weapons and equipment for the Navy, the latest models of this technology are now produced not in batches, but in individual copies. The question of the production of training and training samples is not worth it at all. Under these conditions, only virtual analogues of military equipment and weapons, developed by means of information technology, i.e., training and training systems (TOS, can be considered as the only means capable of providing military-professional training. At the modern level of the development of information technologies, testing is the only universal technical means of monitoring the knowledge of students. Procedures for knowledge control in modern computer testing systems do not meet the requirements for them according to the following characteristics: 1 the absence of the possibility of evaluating the error of the test results; 2 the absence of the possibility of stopping testing when the specified reliability of its results is achieved. In order to effectively implement the means of operational criteria-based pedagogical control of knowledge in the process of training specialists of the Navy and to enable joint analysis and processing of evaluations of learning outcomes, it is advisable to implement the following practical recommendations: 1. Formulating the teacher's preferences system regarding the quality of trainee training and the teacher's preferences system in relation to The significance of single test tasks in the test should be considered as the most important The essential steps in preparing a test for practical use. 2. The teacher who first enters the input of his preference systems should check their actual compliance on a sample of 5-10 such test results that cover the full

  20. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  1. Developing the procedure of modifying the denture soft liner by silver nanoparticles.

    Science.gov (United States)

    Chladek, Grzegorz; Barszczewska-Rybarek, Izabela; Lukaszczyk, Jan

    2012-01-01

    Colonization of denture soft lining materials by fungi and denture plaque leads to infections of mucosa. Microorganisms such as Candida albicans colonize not only the surface of the soft liners, but they also penetrate inside those materials. Therefore the use of common disinfectants, e.g., surface active cleaners, is not a perfect solution for keeping a proper hygiene of soft linings. Modifying soft lining by silver nanoparticles (AgNP) seems to be a right way to overcome those problems. The procedure of modifying two-component silicone material by silver nanoparticles (AgNP) is presented in the article. The solubility tests for both material components have been carried out in the first stage of examinations. On the basis of test results, a solvent has been selected, being a dispersion medium for AgNPs and both soft liner components. The effective method for evaporating a solvent from the composition has been developed. Material components with various AgNP concentrations (10, 20, 40, 80, 120 and 200 ppm) have been obtained. Cured samples of the composites have been examined by SEM to confirm the effectiveness of the procedure.

  2. SFC/SFBMN guidelines update for nuclear cardiology procedures: stress testing in adults and children

    International Nuclear Information System (INIS)

    Manrique, A.; Marie, P.Y.; Maunoury, Ch.; Acar, Ph.; Agostini, D.

    2002-01-01

    The guidelines update for nuclear cardiology procedures are studied in this article. We find the minimum technique conditions for the stress testing practice, the recommendations for the different ischemia activation tests, the choice of the stress test. (N.C.)

  3. 75 FR 5722 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-04

    ... personal identifying information about an employee (other than a social security number (SSN) or other... testing required under this part. (c) As a drug testing laboratory located in Canada or Mexico which is... procedures. (d) As an IITF located in Canada or Mexico which is not certified by HHS under the NLCP, you are...

  4. 75 FR 42579 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens; Repeal of...

    Science.gov (United States)

    2010-07-22

    ... provided in paragraph (i)(2) of this section, for each basic model of conventional cooking tops, and... the cooking efficiency test procedure for microwave ovens under the Energy Policy and Conservation Act (EPCA). DOE has determined that the microwave oven test procedure to measure the cooking efficiency does...

  5. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  6. Development of a simple extraction procedure for chlorpyrifos determination in food samples by immunoassay.

    Science.gov (United States)

    Gabaldón, J A; Maquieira, A; Puchades, R

    2007-02-28

    The suitability of immunoassay methodology for rapid and accurate determination of chlorpyrifos in vegetables was tested. The optimised ELISA detection limit was 0.32ng/ml, with a working range from 0.69 to 6.21ng/ml and an immunoassay test-mid point (IC(50)) of 2.08ng/ml. A rapid sample preparation procedure considering different parameters such as the amount of sample, volume of extractant, extraction time and dilution factor was optimised. The developed direct extraction (DE) and multiresidue (ME) standard procedures were performed in different fortified fresh and processed vegetable samples (tomato, bonnet pepper, bean, pea, asparagus, broccoli, watermelon, melon, lettuce, cucumber, celery and red pepper). Recoveries were in all cases in the whole range 85.2-108.9% for both DE and ME extracts. Also, the comparison of the results obtained by both immunochemical and chromatographic methods for spiked fruits and vegetables were good with a correlation coefficient (r) of 0.97.

  7. 9 CFR 147.30 - Laboratory procedure recommended for the polymerase chain reaction (PCR) test for Mycoplasma...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Laboratory procedure recommended for... Examination Procedures § 147.30 Laboratory procedure recommended for the polymerase chain reaction (PCR) test... tracheal swabs in PBS or 1 mL of broth culture by a non-phenolic procedure. Centrifuge samples at 14,000 x...

  8. Grate Pallet 8232 (GP-8232) Vehicle Pallet, Evaluation Tests MIL-STD-1660, "Design Criteria for Ammunition Unit Loads" and TP-94-01 (REV 1), "Transportability Testing Procedures"

    National Research Council Canada - National Science Library

    Barickman, Philip

    2003-01-01

    .... The testing was conducted for informational purposes only. The GP-8232 Vehicle Pallet was evaluated by the testing procedures set forth in MIL-STD-1660 and TP-94-01 (Rev. 1) testing procedures...

  9. Online test application development using framework CodeIgniter

    Science.gov (United States)

    Wibawa, S. C.; Wahyuningsih, Y.; Sulistyowati, R.; Abidin, R.; Lestari, Y.; Noviyanti; Maulana, D. A.

    2018-01-01

    The purpose of this study is developing application an online test for vocational students and to know the user acceptance testing on the application. The method used in this research is the Research and Development (R & D) only up to the pilot phase of the product. The stage of the procedure of the research namely: (1) Analyze the exam using paper compared to using web-based application test online. (2) Design the media in accordance with the design of the author. (3) To test the product by including a questionnaire instrument against the application that has been done. Researchers carried out tests on class X on the computer and network engineering Vocational High School (SMK) Darul Ma’wa Plumpang. It can be concluded that: (1) application online test was created gets the value of the validator with the percentage of lowest value and the highest value for the validation of products: 25% and 100%. With a total number of 14 questions, after validation of the products obtained from the three aspects of the assessment scale from 81.25 to 100 obtained from 2 different validators with the meaning of an application that has been developed and very suitable for use in school. (2) Based on User Acceptance Testing (UAT), applications can be very well received by the students and recommend to replay the final semester and others. With the successful acquisition of a category which means it’s ready and qualified.

  10. Development of a test procedure for cryogenic adhesive tapes; Entwicklung einer Testprozedur fuer kryogene Klebebaender

    Energy Technology Data Exchange (ETDEWEB)

    Funke, Thomas; Haberstroh, Christoph [TU Dresden (Germany). Bitzer-Professur fuer Kaelte-, Kryo- und Kompressorentechnik; Mayrhofer, Robert; Stipsitz, Johannes [RUAG Space GmbH, Wien (Austria)

    2016-07-01

    At cryostats and dewars for lowest temperatures - especially in connection with liquid-helium cooling at around 4 K, as well at the most applications of the superconductivity - often joints and shutters on the base of low-temperature suited adhesive tapes are required. A current method for the thermal isolation of cold surfaces is their covering with highly reflecting aluminium foils, which are fastened by adhesive aluminium tapes. Selection, usage, and reliability estimation of presumably suited adhesive tapes respectively aluminium tapes occurs presently rather heuristically. A corresponding testing apparature for the measurement of the maximal pulling force was developed and tested by means of a series of test measurements. The testing set-up and measurement results for the validation of the measurement concept with adhesive aluminium tapes are presented in this contribution.

  11. Fabrication and testing of the sintered ceramic UO2 fuel - I - III, Part III - testing of sintered uranium dioxide properties dependent on the fabrication procedure

    International Nuclear Information System (INIS)

    Novakovic, M.; Ristic, M.M.

    1961-12-01

    The objective of this task was testing the influence of some parameters on the properties of sintered UO 2 . The influence of parameters tested were as follows: adhesives; pressure in the pressing procedure; temperature of sintering of the UO 2 powder. Other parameters were chosen according to the theoretical study. Sintering was done in argon atmosphere. Characterization of the UO 2 powder was performed meaning determining the needed chemical, physical and physico-chemical properties. Some new methods were developed within this task: SET method for measuring the specific surfaces, DTA, TGA, high-temperature torsion

  12. Impact assessment procedures for sustainable development: A complexity theory perspective

    International Nuclear Information System (INIS)

    Nooteboom, Sibout

    2007-01-01

    The author assumes that effective Impact Assessment procedures should somehow contribute to sustainable development. There is no widely agreed framework for evaluating such effectiveness. The author suggests that complexity theories may offer criteria. The relevant question is 'do Impact Assessment Procedures contribute to the 'requisite variety' of a social system for it to deal with changing circumstances?' Requisite variety theoretically relates to the capability of a system to deal with changes in its environment. The author reconstructs how thinking about achieving sustainable development has developed in a sequence of discourses in The Netherlands since the 1970s. Each new discourse built on the previous ones, and is supposed to have added to 'requisite variety'. The author asserts that Impact Assessment procedures may be a necessary component in such sequences and derives possible criteria for effectiveness

  13. Development of structural design procedure of plate-fin heat exchanger for HTGR

    Energy Technology Data Exchange (ETDEWEB)

    Mizokami, Yorikata, E-mail: yorikata_mizokami@mhi.co.jp [Mitsubishi Heavy Industries, Ltd., 1-1, Wadasaki-cho 1-Chome, Hyogo-ku, Kobe 652-8585 (Japan); Igari, Toshihide [Mitsubishi Heavy Industries, Ltd., 5-717-1, Fukahori-machi, Nagasaki 851-0392 (Japan); Kawashima, Fumiko [Kumamoto University, 39-1 Kurokami 2-Chome, Kumamoto 860-8555 (Japan); Sakakibara, Noriyuki [Mitsubishi Heavy Industries, Ltd., 5-717-1, Fukahori-machi, Nagasaki 851-0392 (Japan); Tanihira, Masanori [Mitsubishi Heavy Industries, Ltd., 16-5, Konan 2-Chome, Minato-ku, Tokyo 108-8215 (Japan); Yuhara, Tetsuo [The University of Tokyo, 7-3-1, Hongo, Bunkyo-ku, Tokyo 113-8656 (Japan); Hiroe, Tetsuyuki [Kumamoto University, 39-1 Kurokami 2-Chome, Kumamoto 860-8555 (Japan)

    2013-02-15

    Highlights: ► We propose high temperature structural design procedure for plate-fin heat exchanger ► Allowable stresses for brazed structures will be newly discussed ► Validity of design procedure is confirmed by carrying out partial model tests ► Proposed design procedure is applied to heat exchangers for HTGR. -- Abstract: Highly efficient plate-fin heat exchanger for application to HTGR has been focused on recently. Since this heat exchanger is fabricated by brazing a lot of plates and fins, a new procedure for structural design of brazed structures in the HTGR temperature region up to 950 °C is required. Firstly in this paper influences on material strength due to both thermal aging during brazing process and helium gas environment were experimentally examined, and failure mode and failure limit of brazed side-bar structures were experimentally clarified. Secondly allowable stresses for aging materials and brazed structures were newly determined on the basis of the experimental results. For the purpose of validating the structural design procedure including homogenization FEM modeling, a pressure burst test and a thermal fatigue test of partial model for plate-fin heat exchanger were carried out. Finally, results of reference design of plate-fin heat exchangers of recuperator and intermediate heat exchanger for HTGR plant were evaluated by the proposed design criteria.

  14. Developing Testing Accommodations for English Language Learners: Illustrations as Visual Supports for Item Accessibility

    Science.gov (United States)

    Solano-Flores, Guillermo; Wang, Chao; Kachchaf, Rachel; Soltero-Gonzalez, Lucinda; Nguyen-Le, Khanh

    2014-01-01

    We address valid testing for English language learners (ELLs)--students in the United States who are schooled in English while they are still acquiring English as a second language. Also, we address the need for procedures for systematically developing ELL testing accommodations--changes in tests intended to support ELLs to gain access to the…

  15. Test procedures to detect a loss of material in a sequence of balance periods

    International Nuclear Information System (INIS)

    Avenhaus, R.; Beedgen, R.; Sellinschegg, D.

    1985-06-01

    A workshop on Near-Real-Time Accountancy (NRTA) was held in KfK which came to a preliminary end in December 1982. In the framework of this workshop a number of sequential statistical test procedures were proposed which can be used in the case of a NRTA based safeguards regime. In the report the most promising test procedures are investigated. The analysis is based on the chemical separation process of a large model reprocessing facility with a throughput or 1000 tonnes per year. (orig.) [de

  16. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  17. Developing of corrosion and creep property test database system

    International Nuclear Information System (INIS)

    Park, S. J.; Jun, I.; Kim, J. S.; Ryu, W. S.

    2004-01-01

    The corrosion and creep characteristics database systems were constructed using the data produced from corrosion and creep test and designed to hold in common the data and programs of tensile, impact, fatigue characteristics database that was constructed since 2001 and others characteristics databases that will be constructed in future. We can easily get the basic data from the corrosion and creep characteristics database systems when we prepare the new experiment and can produce high quality result by compare the previous test result. The development part must be analysis and design more specific to construct the database and after that, we can offer the best quality to customers various requirements. In this thesis, we describe the procedure about analysis, design and development of the impact and fatigue characteristics database systems developed by internet method using jsp(Java Server pages) tool

  18. Expose : procedure and results of the joint experiment verification tests

    Science.gov (United States)

    Panitz, C.; Rettberg, P.; Horneck, G.; Rabbow, E.; Baglioni, P.

    The International Space Station will carry the EXPOSE facility accommodated at the universal workplace URM-D located outside the Russian Service Module. The launch will be affected in 2005 and it is planned to stay in space for 1.5 years. The tray like structure will accomodate 2 chemical and 6 biological PI-experiments or experiment systems of the ROSE (Response of Organisms to Space Environment) consortium. EXPOSE will support long-term in situ studies of microbes in artificial meteorites, as well as of microbial communities from special ecological niches, such as endolithic and evaporitic ecosystems. The either vented or sealed experiment pockets will be covered by an optical filter system to control intensity and spectral range of solar UV irradiation. Control of sun exposure will be achieved by the use of individual shutters. To test the compatibility of the different biological systems and their adaptation to the opportunities and constraints of space conditions a profound ground support program has been developed. The procedure and first results of this joint Experiment Verification Tests (EVT) will be presented. The results will be essential for the success of the EXPOSE mission and have been done in parallel with the development and construction of the final hardware design of the facility. The results of the mission will contribute to the understanding of the organic chemistry processes in space, the biological adaptation strategies to extreme conditions, e.g. on early Earth and Mars, and the distribution of life beyond its planet of origin.

  19. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  20. Developing Conceptual Understanding and Procedural Skill in Mathematics: An Iterative Process.

    Science.gov (United States)

    Rittle-Johnson, Bethany; Siegler, Robert S.; Alibali, Martha Wagner

    2001-01-01

    Proposes that conceptual and procedural knowledge develop in an iterative fashion and improved problem representation is one mechanism underlying the relations between them. Two experiments were conducted with 5th and 6th grade students learning about decimal fractions. Results indicate conceptual and procedural knowledge do develop, iteratively,…

  1. 78 FR 15807 - Energy Conservation Program: Test Procedures for Television Sets

    Science.gov (United States)

    2013-03-12

    ... displaying dynamic visual content from wired or wireless sources including but not limited to: * * *''. DOE...) standard ``CEA-2037-A, Determination of Television Average Power Consumption'' into the SNOPR. In today's SNOPR, DOE proposes to update the input power requirements in the TVs test procedure NOPR by referencing...

  2. 40 CFR 205.54-1 - Low speed sound emission test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Low speed sound emission test procedures. 205.54-1 Section 205.54-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205...

  3. Test-Induced Priming Impairs Source Monitoring Accuracy in the DRM Procedure

    OpenAIRE

    Dewhurst, S.; Knott, L.; Howe, M. L.

    2011-01-01

    Three experiments investigated the effects of test-induced priming (TIP) on false recognition in the Deese/Roediger-McDermott procedure. In Experiment 1, TIP significantly increased false recognition for participants who made old/new decisions at test but not for participants who made remember/know judgements or were given diagnostic information to help them avoid false recognition. In Experiment 2, a TIP effect was observed with old/new recognition but not when participants were required to ...

  4. C.O.D. toughness testing of medium strength steel as a preliminary development for single specimen J integral toughness tests of SA533-B steel

    International Nuclear Information System (INIS)

    Dean, P.; Tait, R.B.; Garrett, G.G.

    1981-10-01

    The primary purpose of this project is to set up a test facility and to develop the necessary expertise to enable reliable elasto-plastic fracture toughness tests to be performed. Initially, tests are to be conducted on material similar to that used in the Koeberg pressure vessel walls, with the ultimate goal of performing single specimen J integral tests on the pressure vessel steel itself to determine through-thickness toughness variations. The project will comprise a number of stages, each one necessary for the development of the techniques used in J integral testing. These include: (i) development of an appropriate specimen design, of suitable size and shape that is applicable to both crack opening displacement (C.O.D.) and J integral tests; (ii) development, testing and calibration of the necessary associated mechanical and electrical equipment (e.g. clip gauge, amplifiers, interface unit, etc.), with (iii) an estimation of the probable errors and noise levels with a view to their elimantion, leading to (iv) perfection of the sensitivity and reproducibility of, firstly, the multiple specimen C.O.D. technique and, secondly, the multiple specimen J integral techniques. (v) Based on the above techniques, development of the single specimen J integral test method incorporating development of a computerised testing procedure. All the above procedure is to be conducted on similar, but non-Koeberg pressure vessel material ('ROQ Tough'). (vi) Finally, development and testing of both multiple specimen and single specimen J integral tests on actual SA533B material and an investigation of the through thickness toughness and fatigue crack propagation behaviour

  5. Leach test of six 192-iridium pellets based on the IAEA 'special form' test procedures

    International Nuclear Information System (INIS)

    Gordon, G.; Gerdingh, R.

    1981-07-01

    The designation 'special form' may be applied to indispersible solid radioactive material if the material meets the requirements of the tests described in the International Atomic Energy Agency Regulations for the Safe Transport of Radioactive Type Materials. This report presents the procedures and results of a leach test performed as specified in the regulations on 6 'as received' active 192-iridium pellets. Mechanical tests were not carried out prior to or following the leach test. The activity of each of the first 6 water baths was found to be between 2.3 and 12.6 μCi, (8.5 x 10 4 and 4.7 x 10 5 Bq) and of the second 6, between 1.3 to 6.0 μCi, (4.8 x 10 4 to 2.2 x 10 5 Bq) thus exceeding the allowable limit

  6. Large Scale Leach Test Facility: Development of equipment and methods, and comparison to MCC-1 leach tests

    International Nuclear Information System (INIS)

    Pellarin, D.J.; Bickford, D.F.

    1985-01-01

    This report describes the test equipment and methods, and documents the results of the first large-scale MCC-1 experiments in the Large Scale Leach Test Facility (LSLTF). Two experiments were performed using 1-ft-long samples sectioned from the middle of canister MS-11. The leachant used in the experiments was ultrapure deionized water - an aggressive and well characterized leachant providing high sensitivity for liquid sample analyses. All the original test plan objectives have been successfully met. Equipment and procedures have been developed for large-sample-size leach testing. The statistical reliability of the method has been determined, and ''bench mark'' data developed to relate small scale leach testing to full size waste forms. The facility is unique, and provides sampling reliability and flexibility not possible in smaller laboratory scale tests. Future use of this facility should simplify and accelerate the development of leaching models and repository specific data. The factor of less than 3 for leachability, corresponding to a 200,000/1 increase in sample volume, enhances the credibility of small scale test data which precedes this work, and supports the ability of the DWPF waste form to meet repository criteria

  7. Optimization of organic contaminant and toxicity testing analytical procedures for estimating the characteristics and environmental significance of natural gas processing plant waste sludges

    International Nuclear Information System (INIS)

    Novak, N.

    1990-10-01

    The Gas Plant Sludge Characterization Phase IIB program is a continuation of the Canadian Petroleum Association's (CPA) initiatives to characterize sludge generated at gas processing plants. The objectives of the Phase IIB project were to develop an effective procedure for screening waste sludges or centrifuge/leachate generated from sludge samples for volatile, solvent-soluble and water-soluble organics; verify the reproducibility of the three aquatic toxicity tests recommended as the battery of tests for determining the environmental significance of sludge centrifugates or leachates; assess the performance of two terrestrial toxicity tests in determining the environmental significance of whole sludge samples applied to soil; and to assess and discuss the reproducibility and cost-effectiveness of the sampling and analytical techniques proposed for the overall sludge characterization procedure. Conclusions and recommendations are provided for sludge collection, preparation and distribution, organic analyses, toxicity testing, project management, and procedure standardization. The three aquatic and two terrestrial toxicity tests proved effective in indicating the toxicity of complex mixtures. 27 refs., 3 figs., 59 tabs

  8. Recent development in low-constraint fracture toughness testing for structural integrity assessment of pipelines

    Science.gov (United States)

    Kang, Jidong; Gianetto, James A.; Tyson, William R.

    2018-03-01

    Fracture toughness measurement is an integral part of structural integrity assessment of pipelines. Traditionally, a single-edge-notched bend (SE(B)) specimen with a deep crack is recommended in many existing pipeline structural integrity assessment procedures. Such a test provides high constraint and therefore conservative fracture toughness results. However, for girth welds in service, defects are usually subjected to primarily tensile loading where the constraint is usually much lower than in the three-point bend case. Moreover, there is increasing use of strain-based design of pipelines that allows applied strains above yield. Low-constraint toughness tests represent more realistic loading conditions for girth weld defects, and the corresponding increased toughness can minimize unnecessary conservatism in assessments. In this review, we present recent developments in low-constraint fracture toughness testing, specifically using single-edgenotched tension specimens, SENT or SE(T). We focus our review on the test procedure development and automation, round-robin test results and some common concerns such as the effect of crack tip, crack size monitoring techniques, and testing at low temperatures. Examples are also given of the integration of fracture toughness data from SE(T) tests into structural integrity assessment.

  9. 49 CFR 572.75 - Lumbar spine, abdomen, and pelvis assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...) ANTHROPOMORPHIC TEST DEVICES 6-Year-Old Child § 572.75 Lumbar spine, abdomen, and pelvis assembly and test procedure. (a) Lumbar spine, abdomen, and pelvis assembly. The lumbar spine, abdomen, and pelvis consist of... 49 Transportation 7 2010-10-01 2010-10-01 false Lumbar spine, abdomen, and pelvis assembly and...

  10. Investigation of accident management procedures related to loss of feedwater and station blackout in PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Bucalossi, A. [EC JRC, (JRC F.5) PO Box 2, 1755 ZG Petten (Netherlands); Del Nevo, A., E-mail: alessandro.delnevo@enea.it [ENEA, C.R. Brasimone, 40032 Camugnano (Italy); Moretti, F.; D' Auria, F. [GRNSPG, Universita di Pisa, via Diotisalvi 2, 56100 Pisa (Italy); Elkin, I.V.; Melikhov, O.I. [Electrogorsk Research and Engineering Centre, Electrogorsk, Moscow Region (Russian Federation)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Four integral test facility experiments related to VVER-1000 reactor. Black-Right-Pointing-Pointer TH response of the VVER-1000 primary system following total loss of feedwater and station blackout scenarios. Black-Right-Pointing-Pointer Accident management procedures in case of total loss of feedwater and station blackout. Black-Right-Pointing-Pointer Experimental data represent an improvement of existing database for TH code validation. - Abstract: VVER 1000 reactors have some unique and specific features (e.g. large primary and secondary side fluid inventory, horizontal steam generators, core design) that require dedicated experimental and analytical analyses in order to assess the performance of safety systems and the effectiveness of possible accident management strategies. The European Commission funded project 'TACIS 2.03/97', Part A, provided valuable experimental data from the large-scale (1:300) PSB-VVER test facility, investigating accident management procedures in VVER-1000 reactor. A test matrix was developed at University of Pisa (responsible of the project) with the objective of obtaining the experimental data not covered by the OECD VVER validation matrix and with main focus on accident management procedures. Scenarios related to total loss of feed water and station blackout are investigated by means of four experiments accounting for different countermeasures, based on secondary cooling strategies and primary feed and bleed procedures. The transients are analyzed thoroughly focusing on the identification of phenomena that will challenge the code models during the simulations.

  11. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  12. Summary report - development of laboratory tests and the stress- strain behaviour of Olkiluoto mica gneiss

    International Nuclear Information System (INIS)

    Hakala, M.; Heikkilae, E.

    1997-05-01

    This work summarizes the project aimed at developing and qualifying a suitable combination of laboratory tests to establish a statistically reliable stress-strain behaviour of the main rock types at Posiva Oy's detailed investigation sites for disposal of spent nuclear fuel. The work includes literature study of stress-strain behaviour of brittle rock, development and qualification of laboratory tests, suggested test procedures and interpretation methods and finally testing of Olkiluoto mica gneiss. The Olkiluoto study includes over 130 loading tests. Besides the commonly used laboratory tests, direct tensile tests, damage controlled tests and acoustic emission measurements were also carried out. (orig.) (54 refs.)

  13. 75 FR 26183 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-05-11

    ... 2105-AE01 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of...: For program issues, Bohdan Baczara, Office of Drug and Alcohol Policy and Compliance, 1200 New Jersey... of Federal Regulations, as follows: [[Page 26184

  14. Serologic test systems development. Progress report, July 1, 1976--September 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Saunders, G.C.; Clinard, E.H.; Bartlett, M.L.; Petersen, P.M.; Sanders, W.M.; Payne, R.J.; Martinez, E.

    1978-01-01

    Work has continued on the development and application of the Enzyme-Labeled Antibody (ELA) test to the USDA needs. Results on trichinosis, brucellosis, and staphylococcal enterotoxin A detection are very encouraging. A field test for trichinosis detection is being worked out in cooperation with Food Safety and Quality Service personnel. Work is in progress with the Technicon Instrument Corporation to develop a modification of their equipment to automatically process samples by the ELA procedure. An automated ELA readout instrument for 96-well trays has been completed and is being checked out.

  15. Methodology for development of health physics procedures at research reactors in agreement states

    International Nuclear Information System (INIS)

    Woodard, R.C.; Bauer, T.L.; Wehring, B.W.

    1991-01-01

    The University of Texas at Austin is awaiting final license approval to operate a new 1 MW TRIGA reactor for teaching and research. All reactor and laboratory operations, experiments, and monitoring are carried out under health physics procedures that address to ensure consideration of all applicable documents as references in order to comply with the regulations and accepted good practices. This paper examines the development of one procedure Radioactive Material Control by use of the method. The process is examined as a tool to apply to any health physics procedure development. Further discussion focuses on the regulatory anomalies observed during development of the procedure and presents the arguments for the authors resolution of these issues. The design of the reactor facility is also detailed to allow for understanding of the problems encountered during procedural development

  16. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  17. Experiments with Cloze Procedure

    Science.gov (United States)

    Evans, Gordon; Haastrup, Kirsten

    1976-01-01

    The Nordic Test Development Group prepared proficiency tests of English designed to provide reliable information on which to base decisions as to whether a candidate would be able to function in a job as described or whether he could be trained to do so. Two subtests used a modified cloze procedure. (Author/CFM)

  18. Development of a 3-dimensional flow analysis procedure for axial pump impellers

    International Nuclear Information System (INIS)

    Kim, Min Hwan; Kim, Jong In; Park, Jin Seok; Huh, Houng Huh; Chang, Moon Hee

    1999-06-01

    A fluid dynamic analysis procedure was developed using the three-dimensional solid model of an axial pump impeller which was theoretically designed using I-DEAS CAD/CAM/CAE software. The CFD software FLUENT was used in the flow field analysis. The steady-state flow regime in the MCP impeller and diffuser was simulated using the developed procedure. The results of calculation were analyzed to confirm whether the design requirements were properly implemented in the impeller model. The validity of the developed procedure was demonstrated by comparing the calculation results with the experimental data available. The pump performance at the design point could be effectively predicted using the developed procedure. The computed velocity distributions have shown a good agreement with the experimental data except for the regions near the wall. The computed head, however, was over-predicted than the experiment. The design period and cost required for the development of an axial pump impeller can be significantly reduced by applying the proposed methodology. (author). 7 refs., 2 tabs

  19. Machine for development impact tests in sports seats and similar

    International Nuclear Information System (INIS)

    Gonçalves, R M

    2015-01-01

    This paper describes the stages of development of a machine to perform impact tests in sport seats, seats for spectators and multiple seats. This includes reviews and recommendations for testing laboratories that have needs similar to the laboratory where unfolded this process.The machine was originally developed seeking to meet certain impact tests in accordance with the NBR15925 standards; 15878 and 16031. The process initially included the study of the rules and the election of the tests for which the machine could be developed and yet all reports and outcome of interaction with service providers and raw materials.For operating facility, it was necessary to set entirely the machine control, which included the concept of dialogue with operator, the design of the menu screens and the procedures for submission and registration of results. To ensure reliability in the process, the machine has been successfully calibrated according to the requirements of the Brazilian network of calibration.The criticism to this enterprise covers the technical and economic aspects involved and points out the main obstacles that were needed to overcome. (paper)

  20. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  1. A step-up test procedure to find the minimum effective dose.

    Science.gov (United States)

    Wang, Weizhen; Peng, Jianan

    2015-01-01

    It is of great interest to find the minimum effective dose (MED) in dose-response studies. A sequence of decreasing null hypotheses to find the MED is formulated under the assumption of nondecreasing dose response means. A step-up multiple test procedure that controls the familywise error rate (FWER) is constructed based on the maximum likelihood estimators for the monotone normal means. When the MED is equal to one, the proposed test is uniformly more powerful than Hsu and Berger's test (1999). Also, a simulation study shows a substantial power improvement for the proposed test over four competitors. Three R-codes are provided in Supplemental Materials for this article. Go to the publishers online edition of Journal of Biopharmaceutical Statistics to view the files.

  2. Development of assessment procedures at the CEGB's nuclear power training centre

    International Nuclear Information System (INIS)

    Chapman, C.R.; Harris, N.D.C.

    1986-01-01

    The work of a power station engineer can be considered under four aspects: technology, diagnosis action and communication. The development, validation and use of assessment procedures can successfully incorporate the same aspects. The purposes of assessment are reporting training achievement and giving feedback to course members and tutorial staff. The development of standardized procedures to produce, evaluate and mark assessments and to optimize feedback ensures objectivity and uniformity. This has been achieved at the Central Electricity Generating Board's Nuclear Power Training Centre by enlisting an educational consultant to provide guidance and assist in training the resident tutors in assessment procedures. (author)

  3. Development of test practice requirements for a standard method on fracture toughness testing in the transition range

    International Nuclear Information System (INIS)

    McCabe, D.E.; Zerbst, U.; Heerens, J.

    1993-01-01

    This report covers the resolution of several issues that are relevant to the ductile to brittle transition range of structural steels. One of this issues was to compare a statistical-based weakest-link method to constraint data adjustment methods for modeling the specimen size effects on fracture toughness. Another was to explore the concept of a universal transition temperature curve shape (Master Curve). Data from a Materials Properties Council round robin activity were used to test the proposals empirically. The findings of this study are inclosed in an activity for the development of a draft standard test procedure ''Test Practice for Fracture Toughness in the Transition Range''. (orig.) [de

  4. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  5. 77 FR 26607 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2012-05-04

    ... Conservation Program: Test Procedures for Electric Motors and Small Electric Motors; Final Rules #0;#0;Federal... Procedures for Electric Motors and Small Electric Motors AGENCY: Office of Energy Efficiency and Renewable... electric motors and small electric motors. That supplemental proposal, along with an earlier proposal from...

  6. Prototype development and testing of ultrafine grain NZP ceramics. Final report, July 28, 1995--April 27, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Brown, J.J.

    1997-08-04

    The goal of this project was to demonstrate that a new low-expanding ceramic (Ca{sub 0.6},Mg{sub 0.4})Zr{sub 4}(PO{sub 4}){sub 6}, hereafter referred to as CMZP, could be used as an exhaust manifold liner in off-road diesel engines and provide improved engine efficiency (by permitting higher engine operating temperature). This study has successfully demonstrated this improvement and further engine testing (and possible manufacturing) is presently underway at Caterpillar Inc. Laboratories. Basically this program involved two subcontracts: one to Virginia Tech to develop sintering procedures for CMZP, and one to Caterpillar, Inc. to develop slip casting procedures for CMZP. Nearly 100kg of CMZP were prepared by MATVA, Inc. and Virginia Tech for use by Caterpillar. Virginia Tech developed detailed sintering procedures for CMZP and Caterpillar developed slip casting procedures and manufactured several exhaust manifold elbows. These elbows have been cast into prototype cylinder heads and have been shown to be acceptable replacements for metal manifolds. (Caterpillar advises that a new component may require up to 6 years of testing and qualification before acceptance as standard diesel engine part).

  7. Development of Small UAS Beyond-Visual-Line-of-Sight (BVLOS Flight Operations: System Requirements and Procedures

    Directory of Open Access Journals (Sweden)

    Scott Xiang Fang

    2018-04-01

    Full Text Available Due to safety concerns of integrating small unmanned aircraft systems (UAS into non-segregated airspace, aviation authorities have required a set of detect and avoid (DAA systems to be equipped on small UAS for beyond-visual-line-of-sight (BVLOS flight operations in civil airspace. However, the development of small UAS DAA systems also requires BVLOS flights for testing and validation. To mitigate operational risks for small UAS BVLOS flight operations, this paper proposes to initially test small UAS DAA systems in BVLOS flights in a restricted airspace with additional safety features. Later, this paper further discusses the operating procedures and emergency action plans for small UAS BVLOS flight operations. The testing results show that these safety systems developed can help improve operational safety for small UAS BVLOS flight operations.

  8. CiPA: Ongoing testing, future qualification procedures, and pending issues.

    Science.gov (United States)

    Cavero, Icilio; Holzgrefe, Henry

    2015-01-01

    The comprehensive in vitro proarrhythmia assay (CiPA) is a nonclinical, mechanism-based paradigm for assessing drug proarrhythmic liability. The first CiPA assay determines effects on cloned human cardiac ion channels. The second investigates whether the latter study-generated metrics engender proarrhythmic markers on a computationally reconstructed human ventricular action potential. The third evaluates conclusions from, and searches possibly missed effects by in silico analysis, in human stem cell-derived cardiomyocytes (hSC-CMs). CiPA ad hoc Expert-Working Groups have proposed patch clamp protocols for seven cardiac ion channels, a modified O'Hara-Rudy model for in silico analysis, detailed procedures for field (MEA) and action potential (VSD) measurements in hSC-CMs, and 29 reference drugs for CiPA assay testing and validation. CiPA adoption as drug development tool for identifying electrophysiological mechanisms conferring proarrhythmic liability to candidate drugs is a complex, multi-functional task requiring significant time, reflection, and efforts to be fully achieved. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Development and application of emergency operating procedures for nuclear power plants

    International Nuclear Information System (INIS)

    Lin Chengge

    1990-01-01

    The development and application of emergency operating procedures (EOPs) is an important measure to assure the operational safety for nuclear power plants. Event-oriented, symptom-, function- and state-oriented EOPs with their structures, interfaces, development procedures and practical application are described. The ideas and approach can be available for the preparation of EOPs for nuclear power plants which are going to be in service

  10. Summary report - development of laboratory tests and the stress- strain behaviour of Olkiluoto mica gneiss

    Energy Technology Data Exchange (ETDEWEB)

    Hakala, M.; Heikkilae, E. [Helsinki Univ. of Technology, Espoo (Finland). Lab. of Rock Engineering

    1997-05-01

    This work summarizes the project aimed at developing and qualifying a suitable combination of laboratory tests to establish a statistically reliable stress-strain behaviour of the main rock types at Posiva Oy`s detailed investigation sites for disposal of spent nuclear fuel. The work includes literature study of stress-strain behaviour of brittle rock, development and qualification of laboratory tests, suggested test procedures and interpretation methods and finally testing of Olkiluoto mica gneiss. The Olkiluoto study includes over 130 loading tests. Besides the commonly used laboratory tests, direct tensile tests, damage controlled tests and acoustic emission measurements were also carried out. (orig.) (54 refs.).

  11. Development of 3-Pin Fuel Test Loop and Utilization Technology

    International Nuclear Information System (INIS)

    Lee, Chung Young; Sim, B. S.; Lee, C. Y.

    2007-06-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and, fabrication of main equipment, licensing and installation for fuel test loop have been performed. Following contents are described in the report. 1. Design - Design of the In-pile system and Out pile system 2. Fabrication and procurement of the equipment - Fabrication of the In-pile system and In-pool piping - Fabrication and procurement of the equipment of the out-pile system 3. Acquisition of the license - Preparation of the safety analysis report and acquisition of the license - Pre-service inspection of the facility 4. Installation and commissioning - Installation of the FTL - Development of the commissioning procedure

  12. Testing and further development of a solar absorption cooling plant

    Science.gov (United States)

    Amannsberger, K.; Heckel, H.; Kreutmair, J.; Weber, K. H.

    1984-12-01

    Ammonia water absorption cooling units using the process heat of line-focusing solar collectors were developed and tested. Reduction of the evaporation temperature to minus 10 C; development of an air-cooled rectifying device for the refrigerant vapor; dry cooling of absorber and condenser by natural draft; refrigerating capacities of 14 to 10 kW which correspond to air temperatures of 25 to 40 C and 24 kW power consumption to heat the machine; auxiliary power requirement 450 W; full compatibility with changing heat input and air temperature, adaptation by automatic stabilization effects; and power optimization under changing boundary conditions by a simple regulating procedure independent of auxiliary power are achieved. The dynamic behavior of the directly linked collector-refrigeration machine system was determined. Operating conditions, market, and economic viability of solar cooling in third-world countries are described. Ice production procedures using absorption cooling units are demonstrated.

  13. Development of PSA procedure for a criticality in reprocessing facilities

    International Nuclear Information System (INIS)

    Endo, Shigeki; Takanashi, Mitsuhiro; Ueda, Yoshinori

    2012-08-01

    Utilization of risk information for the nuclear safety regulation is being discussed in Japan. The development of probabilistic safety assessment (PSA) procedure is indispensable for the utilization of risk information. The Japan Nuclear Energy Safety Organization (JNES) has been conducting trial PSA to a model plant for major events, i.e. hydrogen explosion, solution boiling, rapid decomposition of TBP complexes, criticality, solvent fire, leakage of molten glass, leakage of high active concentrated liquid waste, loss of all AC electricity, drop of a fuel assembly, for the purpose of developing the PSA procedure for reprocessing facilities. For criticality events results of trial PSA were summarized as a report in which how to evaluate an amount of radioactive materials released from a facility and a health effect on the public were emphasized. Therefore, for criticality events the results of trial PSA were summarized in this report to emphasize procedures from making event progression scenarios to quantifying event sequences, which were not handled in the previous report, in a style of a document describing PSA procedures. (author)

  14. Clean fog rapid procedure test of artificially and naturally polluted HVDC porcelain barrel insulators

    International Nuclear Information System (INIS)

    Vlastos, A.E.

    1992-01-01

    The first question asked in this paper refers to the variation of the peak leakage current prior to the flashover and the variation of the time prior to flashover in the test of artificially polluted insulators when using the up-and-down method. To answer this question sums up the test procedure used in the up-and-down method. For each trial represented the insulator was again polluted artificially and then dried following the procedure described in the paper. Then the insulator was transported into the fog chamber and the voltage and fog was switched on simultaneously. In these experiments a low fog injection rate was used

  15. 75 FR 8528 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office... of small entities, for purposes of the Regulatory Flexibility Act. The Department makes these... necessary for the Department to conduct a regulatory evaluation or Regulatory Flexibility Analysis for this...

  16. Alternative methods for the median lethal dose (LD(50)) test: the up-and-down procedure for acute oral toxicity.

    Science.gov (United States)

    Rispin, Amy; Farrar, David; Margosches, Elizabeth; Gupta, Kailash; Stitzel, Katherine; Carr, Gregory; Greene, Michael; Meyer, William; McCall, Deborah

    2002-01-01

    The authors have developed an improved version of the up-and-down procedure (UDP) as one of the replacements for the traditional acute oral toxicity test formerly used by the Organisation for Economic Co-operation and Development member nations to characterize industrial chemicals, pesticides, and their mixtures. This method improves the performance of acute testing for applications that use the median lethal dose (classic LD50) test while achieving significant reductions in animal use. It uses sequential dosing, together with sophisticated computer-assisted computational methods during the execution and calculation phases of the test. Staircase design, a form of sequential test design, can be applied to acute toxicity testing with its binary experimental endpoints (yes/no outcomes). The improved UDP provides a point estimate of the LD50 and approximate confidence intervals in addition to observed toxic signs for the substance tested. It does not provide information about the dose-response curve. Computer simulation was used to test performance of the UDP without the need for additional laboratory validation.

  17. 40 CFR 63.8687 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.8687 Section 63.8687 Protection of Environment ENVIRONMENTAL... What performance tests, design evaluations, and other procedures must I use? (a) You must conduct each... run must last at least 1 hour. (e) You must use the following equations to determine compliance with...

  18. 40 CFR 63.7112 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.7112 Section 63.7112 Protection of Environment ENVIRONMENTAL..., design evaluations, and other procedures must I use? (a) You must conduct each performance test in Table... use wet dust suppression to control PM from PSH operations, a visible mist is sometimes generated by...

  19. Development and Testing of a Prototype Tuner for the CEBAF Upgrade Cryomodule

    International Nuclear Information System (INIS)

    G. Davis; J. Delayen; M. Drury; E. Feldl

    2001-01-01

    An upgrade cryomodule is being developed for CEBAF at Jefferson Lab. The high-gradient, low-current operation of the superconducting cavities puts stringent requirements on the accuracy of the frequency tuner: a resolution of 1 Hz over a range of 400 KHz. We have developed and tested such a tuner; it consists of a stepper-motor-driven coarse tuner, operating in parallel with a piezo-actuator-driven fine tuner. Tuner test procedures and results are summarized, including frequency resolution, range, and linearity (i.e. frequency vs. tuner position), as well as microphonic effects resulting from tuner operation

  20. Development of two tier test to assess conceptual understanding in heat and temperature

    Science.gov (United States)

    Winarti; Cari; Suparmi; Sunarno, Widha; Istiyono, Edi

    2017-01-01

    Heat and temperature is a concept that has been learnt from primary school to undergraduate levels. One problem about heat and temperature is that they are presented abstractly, theoretical concept. A student conceptual frameworks develop from their daily experiences. The purpose of this research was to develop a two-tier test of heat and temperature concept and measure conceptual understanding of heat and temperature of the student. This study consist of two method is qualitative and quantitative method. The two-tier test was developed using procedures defined by Borg and Gall. The two-tier test consisted of 20 question and was tested for 137 students for collecting data. The result of the study showed that the two-tier test was effective in determining the students’ conceptual understanding and also it might be used as an alternative for assessment and evaluation of students’ achievement

  1. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  2. 40 CFR 86.163-00 - Spot check correlation procedures for vehicles tested using a simulation of the environmental...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Spot check correlation procedures for... Complete Heavy-Duty Vehicles; Test Procedures § 86.163-00 Spot check correlation procedures for vehicles... running change approval, each model year for any manufacturer undergoing the spot checking procedures of...

  3. Developments in UK defect assessment procedures R6 revision 4 and BS7910

    International Nuclear Information System (INIS)

    Sharples, J.K.; Ainsworth, R.A.; Budden, P.J.

    2003-01-01

    The R6 defect assessment procedures have been developed over many years by the UK nuclear power generation industry. The procedures are updated on a regular basis, taking into account the information resulting from the R6 development programme and other available information worldwide. A major revision, Revision 4, of the R6 procedures was released in 2000. Just prior to that release, in 1999, the British Standards flaw assessment procedure BS7910 was issued and combined and updated the previous published documents PD6493 and PD6539, for components operating at temperatures where creep was negligible and important, respectively. BS79l0 is also under constant development. This paper provides a brief overview of the BS7910 and R6 Revision 4 procedures and describes updates to the respective documents since they were first issued. Some ongoing developments which will lead to future revisions to the documents are also described. (author)

  4. 76 FR 25211 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2011-05-04

    ...-government procurement policies that specify high efficiency ballasts. (CA IOUs, No. 19 at p. 2; NRDC, No. 21... luminous efficiency (BLE), which is measured directly using electrical measurements instead of the photometric measurements employed in the test procedure at Appendix Q. The calculation of BLE includes a...

  5. 49 CFR 40.247 - What procedures does the BAT or STT follow after a screening test result?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false What procedures does the BAT or STT follow after a... What procedures does the BAT or STT follow after a screening test result? (a) If the test result is an alcohol concentration of less than 0.02, as the BAT or STT, you must do the following: (1) Sign and date...

  6. 77 FR 8178 - Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting

    Science.gov (United States)

    2012-02-14

    .... EERE-2010-BT-TP-0038] Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting... methodologies and gather comments on testing residential central air conditioners and heat pumps designed to use... residential central air conditioners and heat pumps that are single phase with rated cooling capacities less...

  7. The effect of lubricating oils on bearing fatigue-life using the Evonik RohMax pitting test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Bartels, Thorsten [Evonik RohMax Additives GmbH, Darmstadt (Germany)

    2009-07-01

    A major requirement for modern driveline lubricants is the need to reduce churning losses and friction in order to deliver continual improvements in fuel efficiency. In trying to achieve this oil formulators target lower and lower viscosities, testing the limits of what is acceptable Churning loss reductions are being made by reducing the viscosity of the lubricating oil. Reduced oil viscosities can lead to reduced oil film thicknesses, especially at high operating temperatures. Thinner oil films can lead to an increase in friction, and a decrease in the fatigue-life capacity in lubricated contacts of bearings and gears in several driveline applications. Extensive fluid testing is required. Current test procedures are subject to extremely high variability, and large numbers of experiments are required to develop high confidence in the test conclusions. This publication introduces a new fatigue-life test method, which in our hands provides a clear improvement in test time, cost, and reproducibility. The test's results enable an estimation of the effect of lubricating oils on bearing fatigue-life. This is done by comparing the results to those obtained with reference oils which have also been tested in the standardized bearing tests for lubricating oils. The effects of operating parameters on test accuracy and repeatability have been studied. The parameters studied are oil temperature, contact pressure, speed and the test specimen batch. In addition to the measurement of bearing fatigue-life, the new test may also be used to study gear fatigue-life. We have used this test to investigate the lubrication oils' influence on fatigue-life in bearings and in gears. In order to extend the comparisons to gear performance the reference fluids were evaluated in standard industry test procedures used for determining gear performance, in particular the FZG test rig, thus establishing an extra insight in the fluids' performance by comparing gear test performance

  8. Development of procedure for emergency response in the combined disaster

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Lessons learned from operating experience at the emergency after a East Japan Great Earthquake, have shown that development of decision making procedure and criteria for protective action implementation would be important at the emergency in the combined disaster such as nuclear accidents caused by natural disasters (including tsunami, flood, heavy snow, fire, etc.). In this study, the problemdefinition, the concept of operation and the data development were planned for three years since fiscal year 2011. In tins year, trial calculation of evacuation time estimate (ETE) for the wide area was performed. Moreover, the basic concept and procedure for carrying out ETE condidering the combined emergency were developed based on the last year results. (author)

  9. Development of procedure for emergency response in the combined disaster

    International Nuclear Information System (INIS)

    2013-01-01

    Lessons learned from operating experience at the emergency after a East Japan Great Earthquake, have shown that development of decision making procedure and criteria for protective action implementation would be important at the emergency in the combined disaster such as nuclear accidents caused by natural disasters (including tsunami, flood, heavy snow, fire, etc.). In this study, the problemdefinition, the concept of operation and the data development were planned for three years since fiscal year 2011. In tins year, trial calculation of evacuation time estimate (ETE) for the wide area was performed. Moreover, the basic concept and procedure for carrying out ETE condidering the combined emergency were developed based on the last year results. (author)

  10. Fiber Laser Component Testing for Space Qualification Protocol Development

    Science.gov (United States)

    Falvey, S.; Buelow, M.; Nelson, B.; Starcher, Y.; Thienel, L.; Rhodes, C.; Tull, Jackson; Drape, T.; Westfall, C.

    A test protocol for the space qualifying of Ytterbium-doped diode-pumped fiber laser (DPFL) components was developed under the Bright Light effort, sponsored by AFRL/VSE. A literature search was performed and summarized in an AMOS 2005 conference paper that formed the building blocks for the development of the test protocol. The test protocol was developed from the experience of the Bright Light team, the information in the literature search, and the results of a study of the Telcordia standards. Based on this protocol developed, test procedures and acceptance criteria for a series of vibration, thermal/vacuum, and radiation exposure tests were developed for selected fiber laser components. Northrop Grumman led the effort in vibration and thermal testing of these components at the Aerospace Engineering Facility on Kirtland Air Force Base, NM. The results of the tests conducted have been evaluated. This paper discusses the vibration and thermal testing that was executed to validate the test protocol. The lessons learned will aid in future assessments and definition of space qualification protocols. Components representative of major items within a Ytterbium-doped diode-pumped fiber laser were selected for testing; including fibers, isolators, combiners, fiber Bragg gratings, and laser diodes. Selection of the components was based on guidelines to test multiple models of typical fiber laser components. A goal of the effort was to test two models (i.e. different manufacturers) of each type of article selected, representing different technologies for the same type of device. The test articles did not include subsystems or systems. These components and parts may not be available commercial-off-the-shelf (COTS), and, in fact, many are custom articles, or newly developed by the manufacturer. The primary goal for this effort is a completed taxonomy that lists all relevant laser components, modules, subsystems, and interfaces, and cites the documentation for space

  11. Field Test Evaluation of Conservation Retrofits of Low-Income, Single-Family Buildings in Wisconsin: Blower-Door-Directed Infiltration Reduction Procedure, Field Test Implementation and Results; TOPICAL

    International Nuclear Information System (INIS)

    Gettings, M.B.

    2001-01-01

    A blower-door-directed infiltration retrofit procedure was field tested on 18 homes in south central Wisconsin. The procedure, developed by the Wisconsin Energy Conservation Corporation, includes recommended retrofit techniques as well as criteria for estimating the amount of cost-effective work to be performed on a house. A recommended expenditure level and target air leakage reduction, in air changes per hour at 50 Pascal (ACH50), are determined from the initial leakage rate measured. The procedure produced an average 16% reduction in air leakage rate. For the 7 houses recommended for retrofit, 89% of the targeted reductions were accomplished with 76% of the recommended expenditures. The average cost of retrofits per house was reduced by a factor of four compared with previous programs. The average payback period for recommended retrofits was 4.4 years, based on predicted energy savings computed from achieved air leakage reductions. Although exceptions occurred, the procedure's 8 ACH50 minimum initial leakage rate for advising retrofits to be performed appeared a good choice, based on cost-effective air leakage reduction. Houses with initial rates of 7 ACH50 or below consistently required substantially higher costs to achieve significant air leakage reductions. No statistically significant average annual energy savings was detected as a result of the infiltration retrofits. Average measured savings were -27 therm per year, indicating an increase in energy use, with a 90% confidence interval of 36 therm. Measured savings for individual houses varied widely in both positive and negative directions, indicating that factors not considered affected the results. Large individual confidence intervals indicate a need to increase the accuracy of such measurements as well as understand the factors which may cause such disparity. Recommendations for the procedure include more extensive training of retrofit crews, checks for minimum air exchange rates to insure air quality

  12. 75 FR 8524 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD67 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... IFR to mitigate this conflict between the DOT rules and what we view as beneficial State laws by.... It merely eliminated a conflict that would have precluded parties from complying with certain State...

  13. Development of Open Test-bed for Autonomous Operation in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Seungmin; Heo, Gyunyoung

    2017-01-01

    Nuclear power plants also recognize the need for automation. However, it is dangerous technology to have a significant impact on human society. In addition, due to the uncertain legal responsibility for autonomous operation, the application and development speed of nuclear energy related automation technology will be significantly decrease compared to other industries. It is argued that the application of AI and automation technology to power plants should not be prematurely applied or not based on the principle of applying proven technology since nuclear power plants are the highest level security operated facilities. As described above, the overall algorithm of the Test Bed is an autonomous operation algorithm (rulebased algorithm, learning-based algorithm, semiautonomous operation algorithm) to judge the entry condition of the procedure through condition monitoring and to enter the appropriate operating procedure. In order to make a test bed, the investigation for the heuristic part of the existing procedures and the heuristic part from the circumstance which is not specified in the procedure is needed. In the learning based and semi-autonomous operation algorithms, using MARS to extract its operating data and operational logs and try out various diagnostic algorithms as described above. Through the completion of these future tasks, the test bed which can compared with actual operators will be constructed and that it will be able to check its effectiveness by improving competitively with other research teams through the characteristics of shared platform.

  14. Procedures for ground-water investigations

    International Nuclear Information System (INIS)

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual

  15. Miravalles Geothermal Project: Portable Well Flow Test Equipment and Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The well flow test program has been designed to facilitate the gathering of information, with portable test equipment, from various wells with regard to their capability of flow, the quality of steam produced at various back pressures, the composition and quantity of noncondensable gases flashed from the wells and the composition and quantity of solids in the well's liquid streams (brine). The test program includes procedures for obtaining the following basic flow data pertinent to the plant power cycle design: (1) Effluent steam and brine flows, pressures and temperatures; (2) Noncondensable and dissolved gas contents in steam and brine; (3) H{sub s}S content in gases formed; and (4) Solids content and chemical analysis of steam and brine.

  16. Development of automated generation system of accidental operating procedures for a PWR

    International Nuclear Information System (INIS)

    Artaud, J.L.

    1991-06-01

    The aim of the ACACIA project is to develop an automated generation system of accident operating procedures for a PWR. This research and development study, common at CEA and EDF, has two objectives: at mean-dated the realization of a validation tool and a procedure generation; at long-dated the dynamic generation of real time procedures. This work is consecrated at the realization of 2 prototypes. These prototypes and the technics used are described in detail. The last chapter explores the perspectives given by this type of tool [fr

  17. Development, implementation and management of a drug testing program in the workplace

    Energy Technology Data Exchange (ETDEWEB)

    Burtis, C.A.

    1990-01-01

    To combat the rising use of drugs in the workplace many American companies have implemented drug testing programs and are testing employees and job applicants for use of illegal drugs. In addition, on September 15, 1986, Executive Order No.12564 was issued by President Reagan, which requires all federal agencies to develop programs and policies, one of the goals of which is to achieve a drug-free federal workplace. Included in this Executive Order is the requirement that federal agencies implement drug testing has become a prevalent practice as a means to detect and deter drug use in the workplace. Before a drug testing program is implemented, it is imperative that policies and procedures are developed that (1) ensure the accuracy of test results, (2) protect the validity and integrity of the specimen, (3) guarantee due process, and (4) maintain confidentiality. To make certain that these prerequisites were met in the government drug testing programs, the US Department of Health and Human Services (HHS) was directed to develop technical and scientific guidelines for conducting such programs. 15 refs., 1 fig., 2 tabs.

  18. Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.B.

    1997-01-07

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

  19. 29 CFR 1928.53 - Protective enclosures for wheel-type agricultural tractors-test procedures and performance...

    Science.gov (United States)

    2010-07-01

    ... accomplished by using a 4,410-lb (2,000-kg) weight acting as a pendulum. The impact face of the weight shall be... the test; and (G) When any cables, props, or blocking shift or break during the test, the test shall... structure may be used to complete the test procedure; and (C) Impact at side. The blocking and restraining...

  20. Applying computer-based procedures in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Mauro V. de; Carvalho, Paulo V.R. de; Santos, Isaac J.A.L. dos; Grecco, Claudio H.S. [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil). Div. de Instrumentacao e Confiabilidade Humana], e-mail: mvitor@ien.gov.br, e-mail: paulov@ien.gov.br, e-mail: luquetti@ien.gov.br, e-mail: grecco@ien.gov.br; Bruno, Diego S. [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Escola Politecnica. Curso de Engenharia de Controle e Automacao], e-mail: diegosalomonebruno@gmail.com

    2009-07-01

    Plant operation procedures are used to guide operators in coping with normal, abnormal or emergency situations in a process control system. Historically, the plant procedures have been paper-based (PBP), with the digitalisation trend in these complex systems computer-based procedures (CBPs) are being developed to support procedure use. This work shows briefly the research on CBPs at the Human-System Interface Laboratory (LABIHS). The emergency operation procedure EOP-0 of the LABIHS NPP simulator was implemented in the ImPRO CBP system. The ImPRO system was chosen for test because it is available for download in the Internet. A preliminary operation test using the implemented procedure in the CBP system was realized and the results were compared to the operation through PBP use. (author)

  1. A test procedure for energetic and performance analysis of cold appliances for the food industry

    International Nuclear Information System (INIS)

    Armani, F; Boscolo, A

    2013-01-01

    In this article we present a novel approach for the characterization of cold appliances and in particular of refrigerators based on the standard vapour compression cycle with a reciprocating on/off compressor. The test procedure is based on a virtual instrument that perform both the stimulus and the data acquisition on the device under test. Acquired data is elaborated to fit a semi-empirical model based on the energetic balances between thermal and electrical sub systems and the heat exchanged with the environment. This approach results in a simple method to calculate useful parameters of the refrigerator, such as energetic performance, cooling effect and limit values of thermal loads. The test procedure requires only a few temperatures and the electric power consumption to be monitored, resulting in a low impact on the refrigerator. Preliminary tests showed a good estimation of parameters and prediction of energy consumption and heat extraction capacity of the refrigerator under test

  2. The European ITER test blanket modules: Progress in development of fabrication technologies towards standardization

    Energy Technology Data Exchange (ETDEWEB)

    Zmitko, Milan, E-mail: milan.zmitko@f4e.europa.eu [Fusion for Energy (F4E), Josep Pla 2, Barcelona (Spain); Thomas, Noël [ATMOSTAT, F-94815 Villejuif (France); LiPuma, Antonella; Forest, Laurent [CEA-Saclay, DEN, DM2S, SEMT, F-91191 Gif-sur-Yvette (France); Cogneau, Laurence [CEA-DRT, 38000 Grenoble (France); Rey, Jörg; Neuberger, Heiko [Karlsruhe Institute of Technology (KIT), Postfach 3640, Karlsruhe (Germany); Poitevin, Yves [Fusion for Energy (F4E), Josep Pla 2, Barcelona (Spain)

    2016-11-01

    Highlights: • Significant progress on the development of welding procedures for European TBM achieved. • Fabrication processes feasibility based on diffusion and fusion welding demonstrated. • An optimized welding scenario/sequence for TBM box assembly identified. • Future qualification of pF/WPS proposed through realization of a number of QMUs. - Abstract: The paper reviews progress achieved in development of fabrication technologies and procedures applied for manufacturing of the TBM sub-components, like, HCLL and HCPB cooling plates, HCLL/HCPB stiffening plates, and HCLL/HCPB first wall and side caps. The used technologies are based on fusion and diffusion welding techniques taking into account specificities of the EUROFER97 steel. Development of a standardized procedure complying with professional codes and standards (RCC-MRx), a preliminary fabrication/welding procedure specification (pF/WPS), is described based on fabrication and non-destructive and destructive characterization of feasibility mock-ups (FMU) aimed at assessing the suitability of a fabrication process for fulfilling the design and fabrication specifications. The main FMUs characterization results are reported (e.g. pressure resistance and helium leak tightness tests, mechanical properties and microstructure at the weld joints, geometrical characteristics of the sub-components and internal cooling channels) and the key pF/WPS steps and parameters are outlined. Also, fabrication procedures for the TBM box assembly are presently under development for the establishment of an optimized assembly sequence/scenario and development of standardized welding procedure specifications. In conclusions, further steps towards the pF/WPS qualification are briefly discussed.

  3. Comparison of IRT Likelihood Ratio Test and Logistic Regression DIF Detection Procedures

    Science.gov (United States)

    Atar, Burcu; Kamata, Akihito

    2011-01-01

    The Type I error rates and the power of IRT likelihood ratio test and cumulative logit ordinal logistic regression procedures in detecting differential item functioning (DIF) for polytomously scored items were investigated in this Monte Carlo simulation study. For this purpose, 54 simulation conditions (combinations of 3 sample sizes, 2 sample…

  4. 75 FR 13009 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-03-18

    ... DEPARTMENT OF TRANSPORTATION Office of the Secretary 49 CFR Part 40 [Docket DOT-OST-2008-0088] RIN OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs Correction In rule document 2010-3731 beginning on page 8528 in the issue of Thursday, February 25, 2010, make the...

  5. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2012-03-07

    ... dryer usage factor; and (5) replaces the current representative load size calculation in the drying... specifications for the dryer to be used for bone-drying the test cloth; (10) clarifies the procedures for.... 12 at p. 4-5) NEEA expressed concern that the definition of the active washing mode leaves out...

  6. Development of critical digital review procedure

    International Nuclear Information System (INIS)

    Huang Huiwen; Liao Benching; Tseng Maosheng; Chung Hsianghan; Cheng Tsungchieh; Chen Minghuei

    2011-01-01

    This paper describes the critical digital review (CDR) procedure, which was developed by Institute of Nuclear Energy Research (INER), and sponsored by Taiwan Power Company (TPC). A preliminary CDR application experience which was performed by INER, is also described in this paper. Currently, CDR becomes one of the policies for digital Instrumentation and Control (I and C) system replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The 'CDR Review Items' chapter proposes optional review items, including the comparison of the design change, Software Verification and Validation (SV and V), Failure Mode and Effects Analysis (FMEA), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, HFE Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. Since CDR has become a TPC policy, Chin Shan Nuclear Power Plant (NPP) performed the CDR practice of Automatic Voltage Regulator (AVR) digital I and C replacement, even though the project had been on the half way. The major review items of this CDR were: the comparison of the design change, SV and V, FMEA, Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/ Component, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. The experience of the CDR showed the importance of preparation of the documents by the vendor. This means the communication with the vendors for the bid preparation is crucial. (author)

  7. Developing Competency in Payroll Procedures

    Science.gov (United States)

    Jackson, Allen L.

    1975-01-01

    The author describes a sequence of units that provides for competency in payroll procedures. The units could be the basis for a four to six week minicourse and are adaptable, so that the student, upon completion, will be able to apply his learning to any payroll procedures system. (Author/AJ)

  8. Accuracy of a Classical Test Theory-Based Procedure for Estimating the Reliability of a Multistage Test. Research Report. ETS RR-17-02

    Science.gov (United States)

    Kim, Sooyeon; Livingston, Samuel A.

    2017-01-01

    The purpose of this simulation study was to assess the accuracy of a classical test theory (CTT)-based procedure for estimating the alternate-forms reliability of scores on a multistage test (MST) having 3 stages. We generated item difficulty and discrimination parameters for 10 parallel, nonoverlapping forms of the complete 3-stage test and…

  9. Test plan guidance for transuranic-contaminated arid landfill remedial technology development

    International Nuclear Information System (INIS)

    Evans, J.; Shaw, P.

    1995-05-01

    This document provides guidance for preparing plans to test or demonstrate buried waste assessment or remediation technologies supported by the U.S. Department of Energy's Landfill Stabilization Focus Area, Transuranic-Contaminated Arid Landfill Product Line. This document also provides guidance for development of data quality objectives, along with the necessary data to meet the project objectives. The purpose is to ensure that useful data of known quality are collected to support conclusions associated with the designated demonstration or test. A properly prepared test plan will integrate specific and appropriate objectives with needed measurements to ensure data will reflect the Department of Energy Office of Technology Development's mission, be consistent with Landfill Stabilization Focus Area test goals, and be useful for the Department of Energy Environmental Restoration and Waste Management programs and other potential partners (e.g., commercial concerns). The test plan becomes the planning and working document for the demonstration or test to be conducted ensuring procedures are followed that will allow data of sufficient quality to be collected for comparison and evaluation

  10. SQUG cable tray and conduit evaluation procedure

    International Nuclear Information System (INIS)

    Smith, P.D.; Eder, S.J.; Conoscente, J.P.

    1990-01-01

    Cable tray and conduit systems for electrical cables are a common feature and industrial facilities. They have an excellent performance history in past strong earthquake, even though they are rarely designed for earthquakes. Considerable data have been gathered on their performance in earthquakes and in shake table testing. The data have been used to develop a procedure for the verification of the seismic adequacy of cable tray and conduit systems in operating nuclear plants. The procedure is discussed in this paper. It will result in substantial savings, such as reduced engineering effort, fewer modifications of existing hardware, and simpler documentation, relative to alternate procedures like dynamic analysis of shake table testing. The procedure ensures safety-function in a unique manner since the methodology used to develop it (1) is based on a large body of historical data and (2) uses a relative approach of ensuring that nuclear plant systems will perform at least as well as systems that performed well in past earthquakes. (orig.)

  11. Development of quality assurance procedures for production of sealed radiation source

    CERN Document Server

    Nam, J H; Cho, W K; Han, H S; Hong, S B; Kim, K H; Kim, S D; Lee, Y G; Lim, N J

    2001-01-01

    The quality assurance procedures for sealed radiation sources production using HANARO and RIPF have been developed. The detailed quality assurance procedures are essential to manage the whole work process effectively and ensure the quality of the produced sealed sources. Through applying this quality assurance procedures to the entire production works of the sealed radiation sources, it is expected that the quality of the products, the safety of the works and the satisfaction of the customers will be increased.

  12. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  13. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  14. Development and evaluation of an automated system for testing current meters

    Directory of Open Access Journals (Sweden)

    Ezequiel Saretta

    2016-02-01

    Full Text Available ABSTRACT Current meters are equipment widely used for estimating flow velocity in rivers and streams. Periodic calibrations of current meters are important to ensure the quality of measurements, but the required testing facilities are complex and only available in a few institutions. However, advances in electronics and automation may contribute to developing simple and reliable calibration systems. Thus, this study aimed to develop an automated system for testing current meters, which consisted of a trapezoidal channel, a step motor, a tow car and a management system, composed of a supervisory application and microprocessed modules to control the motor and the data acquisition. Evaluations of the displacement velocity showed that it matched the reference value up to 1.85 m s-1 for a vertical-axis current meter and 2.3 m s-1 for a horizontal-axis one. The developed system showed reliability during tests, for both current meter movement and data acquisition. The management of the system based on the developed modules and the supervisory application improved its user interface, turning all the procedure into a simple task.

  15. A review of mammalian carcinogenicity study design and potential effects of alternate test procedures on the safety evaluation of food ingredients.

    Science.gov (United States)

    Hayes, A W; Dayan, A D; Hall, W C; Kodell, R L; Williams, G M; Waddell, W D; Slesinski, R S; Kruger, C L

    2011-06-01

    Extensive experience in conducting long term cancer bioassays has been gained over the past 50 years of animal testing on drugs, pesticides, industrial chemicals, food additives and consumer products. Testing protocols for the conduct of carcinogenicity studies in rodents have been developed in Guidelines promulgated by regulatory agencies, including the US EPA (Environmental Protection Agency), the US FDA (Food and Drug Administration), the OECD (Organization for Economic Co-operation and Development) for the EU member states and the MAFF (Ministries of Agriculture, Forestries and Fisheries) and MHW (Ministry of Health and Welfare) in Japan. The basis of critical elements of the study design that lead to an accepted identification of the carcinogenic hazard of substances in food and beverages is the focus of this review. The approaches used by entities well-known for carcinogenicity testing and/or guideline development are discussed. Particular focus is placed on comparison of testing programs used by the US National Toxicology Program (NTP) and advocated in OECD guidelines to the testing programs of the European Ramazzini Foundation (ERF), an organization with numerous published carcinogenicity studies. This focus allows for a good comparison of differences in approaches to carcinogenicity testing and allows for a critical consideration of elements important to appropriate carcinogenicity study designs and practices. OECD protocols serve as good standard models for carcinogenicity testing protocol design. Additionally, the detailed design of any protocol should include attention to the rationale for inclusion of particular elements, including the impact of those elements on study interpretations. Appropriate interpretation of study results is dependent on rigorous evaluation of the study design and conduct, including differences from standard practices. Important considerations are differences in the strain of animal used, diet and housing practices, rigorousness

  16. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    International Nuclear Information System (INIS)

    Lioce, D.; Asztalos, M.; Alemberti, A.; Barucca, L.; Frogheri, M.; Saiu, G.

    2012-01-01

    Highlights: ► Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. ► The two tests have been simulated by means of the Relap5 computer code. ► Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000 ® plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two selected tests has been defined and, in order to perform the pre-operational tests simulations, a

  17. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    Energy Technology Data Exchange (ETDEWEB)

    Lioce, D., E-mail: donato.lioce@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Asztalos, M., E-mail: asztalmj@westinghouse.com [Westinghouse Electric Company, Cranberry Twp, PA 16066 (United States); Alemberti, A., E-mail: alessandro.alemberti@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Barucca, L. [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Frogheri, M., E-mail: monicalinda.frogheri@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Saiu, G., E-mail: gianfranco.saiu@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. Black-Right-Pointing-Pointer The two tests have been simulated by means of the Relap5 computer code. Black-Right-Pointing-Pointer Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000{sup Registered-Sign} plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two

  18. Development of quality standards of medicinal mistletoe – Helicanthes elastica (Desr. Danser employing Pharmacopoeial procedures

    Directory of Open Access Journals (Sweden)

    K.N. Sunil Kumar

    2016-11-01

    Full Text Available Helicanthes elastica (Desr. Danser (Loranthaceae, commonly known as Indian mango mistletoe, is a parasitic shrub found widely growing on mango trees in southern India. Development of monographic quality standards is need of the hour for Pharmacopoeial/extra-Pharmacopoeial and folk medicinal plants. Systematic pharmacognostical evaluation of leaves of H. elastica has been carried out employing Pharmacopoeial procedures of testing herbal drugs. Macro–microscopic features of H. elastica leaf were recorded. Ethanolic extract was tested positive for alkaloids, steroids, carbohydrates, tannins, saponins and phenols. HPTLC fingerprint profile was developed for the identification of extracts using reference standard β-sitosterol glucoside. Results of the present investigation would serve as a source of pharmacognostical information and a document to control the quality of H. elastica (Desr. Danser. Keywords: HPTLC, Mango mistletoe, Medicinal plant monograph, Quality control

  19. Procedure to select test organisms for environmental risk assessment of genetically modified crops in aquatic systems.

    Science.gov (United States)

    Hilbeck, Angelika; Bundschuh, Rebecca; Bundschuh, Mirco; Hofmann, Frieder; Oehen, Bernadette; Otto, Mathias; Schulz, Ralf; Trtikova, Miluse

    2017-11-01

    For a long time, the environmental risk assessment (ERA) of genetically modified (GM) crops focused mainly on terrestrial ecosystems. This changed when it was scientifically established that aquatic ecosystems are exposed to GM crop residues that may negatively affect aquatic species. To assist the risk assessment process, we present a tool to identify ecologically relevant species usable in tiered testing prior to authorization or for biological monitoring in the field. The tool is derived from a selection procedure for terrestrial ecosystems with substantial but necessary changes to adequately consider the differences in the type of ecosystems. By using available information from the Water Framework Directive (2000/60/EC), the procedure can draw upon existing biological data on aquatic systems. The proposed procedure for aquatic ecosystems was tested for the first time during an expert workshop in 2013, using the cultivation of Bacillus thuringiensis (Bt) maize as the GM crop and 1 stream type as the receiving environment in the model system. During this workshop, species executing important ecological functions in aquatic environments were identified in a stepwise procedure according to predefined ecological criteria. By doing so, we demonstrated that the procedure is practicable with regard to its goal: From the initial long list of 141 potentially exposed aquatic species, 7 species and 1 genus were identified as the most suitable candidates for nontarget testing programs. Integr Environ Assess Manag 2017;13:974-979. © 2017 SETAC. © 2017 SETAC.

  20. Standard testing procedures for optical fiber and unshielded twisted pair at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.L.

    1993-11-01

    This document will establish a working standard for testing optical fiber and unshielded twisted pair cables included in the Lab-wide telecommunications cabling system. The purpose of these standard testing procedures is to deliver to all Sandians a reliable, low-maintenance, state-of-the-art, ubiquitous telecommunications cabling infrastructure capable of satisfying all current and future telecommunication needs.

  1. Development of a leak-before break procedure for pressurised components

    International Nuclear Information System (INIS)

    Langston, D.B.

    1989-05-01

    For pressurised components there is an increasing interest in the use of leak-before-break arguments to show that defects will behave in a ''failsafe'' manner by growing in such a way as to cause a detectable leak before a disruptive failure of the pressure boundary can occur. The CEGB operates a wide variety of plant and has recognised the need for a flexible leak-before-break procedure which can be applied in a variety of different situations including part-through defects. This paper describes the development of such a procedure and discusses some of the key aspects of the leak-before-break procedure. (author)

  2. Development of ISA procedure for uranium fuel fabrication and enrichment facilities

    International Nuclear Information System (INIS)

    Yamate, Kazuki; Arakawa, Tomoyuki; Yamashita, Masahiro; Sasaki, Noriaki; Hirano, Mitsumasa

    2011-01-01

    The integrated safety analysis (ISA) procedure has been developed to apply risk-informed regulation to uranium fuel fabrication and enrichment facilities. The major development efforts are as follows: (a) preparing the risk level matrix as an index for items-relied-on-for-safety (IROFS) identification, (b) defining requirements of IROFS, and (c) determining methods of IROFS importance based on the results of risk- and scenario-based analyses. For the risk level matrix, the consequence and likelihood categories have been defined by taking into account the Japanese regulatory laws, rules, and safety standards. The trial analyses using the developed procedure have been performed for several representative processes of the reference uranium fuel fabrication and enrichment facilities. This paper presents the results of the ISA for the sintering process of the reference fabrication facility. The results of the trial analyses have demonstrated the applicability of the procedure to the risk-informed regulation of these facilities. (author)

  3. The Development of CPSES Plug-in(CPMP) for APR1400 Computerized Procedure Effective Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Seong, No Kyu; Park, Jin Kyun; Jung, Yeon Sub [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    The Computerized Procedure System (CPS) is one of the Man Machine Interface (MMI) resources of the Shin-Kori 3 and 4 nuclear power plants. The CPS is a computerized operator support system that enables operating crew to execute procedures in an accurate and fast manner. The Computerized Procedure (CP) is the XML data file in executable format that can be installed in the Procedure eXecution System (PXS) for execution. The CP contains specific information related to a particular procedure (i.e. LOCA). These computerized procedures such as Alarm Response Procedures (ARP) are separated into individual alarm procedure to maximize function interface between CPS and DCS. E.g. 'Procedure open by alarm list'. The procedure writer's burden to manage many procedures has been increased because of separated procedures. This paper introduces Computerized Procedure System Engineering System (CPSES) plug-in that is computerized procedure management program (CPMP) to reduce procedure writer's burden. This paper introduces the main features of CPMP. CPMP reduces procedure writer's or CPX maintainer's burden. This program is implemented and tested by program design requirement.

  4. Analytical quality assurance procedures developed for the IAEA's Reference Asian Man Project (Phase 2)

    International Nuclear Information System (INIS)

    Kawamura, H.; Parr, R.M.; Dang, H.S.; Tian, W.; Barnes, R.M.; Iyengar, G.V.

    2000-01-01

    Analytical quality assurance procedures adopted for use in the IAEA Co-ordinated Research Project on Ingestion and Organ Content of Trace Elements of Importance in Radiological Protection are designed to ensure comparability of the analytical results for Cs, I, Sr, Th, U and other elements in human tissues and diets collected and analysed in nine participating countries. The main analytical techniques are NAA and ICP-MS. For sample preparation, all participants are using identical food blenders which have been centrally supplied after testing for contamination. For quality control of the analyses, six NIST SRMs covering a range of matrices with certified and reference values for the elements of interest have been distributed. A new Japanese reference diet material has also been developed. These quality assurance procedures are summarized here and new data are presented for Cs, I, Sr, Th and U in the NIST SRMs. (author)

  5. Permutation tests for goodness-of-fit testing of mathematical models to experimental data.

    Science.gov (United States)

    Fişek, M Hamit; Barlas, Zeynep

    2013-03-01

    This paper presents statistical procedures for improving the goodness-of-fit testing of theoretical models to data obtained from laboratory experiments. We use an experimental study in the expectation states research tradition which has been carried out in the "standardized experimental situation" associated with the program to illustrate the application of our procedures. We briefly review the expectation states research program and the fundamentals of resampling statistics as we develop our procedures in the resampling context. The first procedure we develop is a modification of the chi-square test which has been the primary statistical tool for assessing goodness of fit in the EST research program, but has problems associated with its use. We discuss these problems and suggest a procedure to overcome them. The second procedure we present, the "Average Absolute Deviation" test, is a new test and is proposed as an alternative to the chi square test, as being simpler and more informative. The third and fourth procedures are permutation versions of Jonckheere's test for ordered alternatives, and Kendall's tau(b), a rank order correlation coefficient. The fifth procedure is a new rank order goodness-of-fit test, which we call the "Deviation from Ideal Ranking" index, which we believe may be more useful than other rank order tests for assessing goodness-of-fit of models to experimental data. The application of these procedures to the sample data is illustrated in detail. We then present another laboratory study from an experimental paradigm different from the expectation states paradigm - the "network exchange" paradigm, and describe how our procedures may be applied to this data set. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. Preliminary study for the reliability Assurance on results and procedure of the out-pile mechanical characterization test for a fuel assembly; Lateral Vibration Test (I)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kang Hee; Yoon, Kyung Hee; Kim, Hyung Kyu [KAERI, Daejeon (Korea, Republic of)

    2007-07-01

    The reliability assurance with respect to the test procedure and results of the out-pile mechanical performance test for the nuclear fuel assembly is an essential task to assure the test quality and to get a permission for fuel loading into the commercial reactor core. For the case of vibration test, proper management and appropriate calibration of instruments and devices used in the test, various efforts to minimize the possible error during the test and signal acquisition process are needed. Additionally, the deep understanding both of the theoretical assumption and simplification for the signal processing/modal analysis and of the functions of the devices used in the test were highly required. In this study, the overall procedure and result of lateral vibration test were assembly's mechanical characterization were briefly introduced. A series of measures to assure and improve the reliability of the vibration test were discussed.

  7. Preliminary study for the reliability Assurance on results and procedure of the out-pile mechanical characterization test for a fuel assembly; Lateral Vibration Test (I)

    International Nuclear Information System (INIS)

    Lee, Kang Hee; Yoon, Kyung Hee; Kim, Hyung Kyu

    2007-01-01

    The reliability assurance with respect to the test procedure and results of the out-pile mechanical performance test for the nuclear fuel assembly is an essential task to assure the test quality and to get a permission for fuel loading into the commercial reactor core. For the case of vibration test, proper management and appropriate calibration of instruments and devices used in the test, various efforts to minimize the possible error during the test and signal acquisition process are needed. Additionally, the deep understanding both of the theoretical assumption and simplification for the signal processing/modal analysis and of the functions of the devices used in the test were highly required. In this study, the overall procedure and result of lateral vibration test were assembly's mechanical characterization were briefly introduced. A series of measures to assure and improve the reliability of the vibration test were discussed

  8. Development and verification testing of automation and robotics for assembly of space structures

    Science.gov (United States)

    Rhodes, Marvin D.; Will, Ralph W.; Quach, Cuong C.

    1993-01-01

    A program was initiated within the past several years to develop operational procedures for automated assembly of truss structures suitable for large-aperture antennas. The assembly operations require the use of a robotic manipulator and are based on the principle of supervised autonomy to minimize crew resources. A hardware testbed was established to support development and evaluation testing. A brute-force automation approach was used to develop the baseline assembly hardware and software techniques. As the system matured and an operation was proven, upgrades were incorprated and assessed against the baseline test results. This paper summarizes the developmental phases of the program, the results of several assembly tests, the current status, and a series of proposed developments for additional hardware and software control capability. No problems that would preclude automated in-space assembly of truss structures have been encountered. The current system was developed at a breadboard level and continued development at an enhanced level is warranted.

  9. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  10. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  11. Development and verification test of integral reactor major components

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. I.; Kim, Y. W.; Kim, J. H. and others

    1999-03-01

    The conceptual designs for SG, MCP, CEDM to be installed in the integral reactor SMART were developed. Three-dimensional CAD models for the major components were developed to visualize the design concepts. Once-through helical steam generator was conceptually designed for SMART. Canned motor pump was adopted in the conceptual design of MCP. Linear pulse motor type and ballscrew type CEDM, which have fine control capabilities were studied for adoption in SMART. In parallel with the structural design, the electro-magnetic design was performed for the sizing motors and electro-magnet. Prototypes for the CEDM and MCP sub-assemblies were developed and tested to verify the performance. The impeller design procedure and the computer program to analyze the dynamic characteristics of MCP rotor shaft were developed. The design concepts of SG, MCP, CEDM were also invetigated for the fabricability.

  12. Development and verification test of integral reactor major components

    International Nuclear Information System (INIS)

    Kim, J. I.; Kim, Y. W.; Kim, J. H. and others

    1999-03-01

    The conceptual designs for SG, MCP, CEDM to be installed in the integral reactor SMART were developed. Three-dimensional CAD models for the major components were developed to visualize the design concepts. Once-through helical steam generator was conceptually designed for SMART. Canned motor pump was adopted in the conceptual design of MCP. Linear pulse motor type and ballscrew type CEDM, which have fine control capabilities were studied for adoption in SMART. In parallel with the structural design, the electro-magnetic design was performed for the sizing motors and electro-magnet. Prototypes for the CEDM and MCP sub-assemblies were developed and tested to verify the performance. The impeller design procedure and the computer program to analyze the dynamic characteristics of MCP rotor shaft were developed. The design concepts of SG, MCP, CEDM were also invetigated for the fabricability

  13. Transportability Testing of the Family of Medium Tactical Vehicles (FMTV) 10-Ton Dump Truck, TP-94-01, Rev. 2, June 2004, "Transportability Testing Procedures"

    National Research Council Canada - National Science Library

    Barickman, Philip W

    2007-01-01

    ... (FMTV) 10-ton dump truck manufactured by Stewart and Stevenson Systems, Inc., Sealy, Texas. The testing was conducted in accordance with TP-94-01, Revision 2, June 2004 "Transportability Testing Procedures...

  14. Transversal of Procedure Elements in a Computerized Procedure System

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Yeonsub [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    APR1400 MCR(Main Control Room) has introduced CPS(Computerized Procedure System). APR400 CPS is framed with overview pane, step detail pane, and monitoring pane. The overview shows the step in one dimensional array. Diagram in the step detail pane is called as flowlogic diagram. The flowlogic diagram has advantage of being intuitive and not being segmented so that the interfaces are easy to follow and understand. While developing CPS software or training operators these interfaces, however, there is still areas to refine behaviors of flowlogic diagram. If flowlogic diagram has contingency instructions, it is sometime difficult to interpret it properly. Therefore this paper is trying to explain behavior of flowlogic diagram in view of procedure elements. Procedure execution can be called as transversal of steps and instructions in flowlogic diagram. Both hierarchy of procedures elements and flowlogic diagram provides useful framework to test transversal with completeness. Navigation button behaviors are interpreted in view of flowlogic diagram. The framework and flowlogic diagram can be further applied to improve CPS user interfaces.

  15. New Procedure to Develop Lumped Kinetic Models for Heavy Fuel Oil Combustion

    KAUST Repository

    Han, Yunqing; Elbaz, Ayman M.; Roberts, William L.; Im, Hong G.

    2016-01-01

    A new procedure to develop accurate lumped kinetic models for complex fuels is proposed, and applied to the experimental data of the heavy fuel oil measured by thermogravimetry. The new procedure is based on the pseudocomponents representing

  16. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  17. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  18. A statistical procedure for testing financial contagion

    Directory of Open Access Journals (Sweden)

    Attilio Gardini

    2013-05-01

    Full Text Available The aim of the paper is to provide an analysis of contagion through the measurement of the risk premia disequilibria dynamics. In order to discriminate among several disequilibrium situations we propose to test contagion on the basis of a two-step procedure: in the first step we estimate the preference parameters of the consumption-based asset pricing model (CCAPM to control for fundamentals and to measure the equilibrium risk premia in different countries; in the second step we measure the differences among empirical risk premia and equilibrium risk premia in order to test cross-country disequilibrium situations due to contagion. Disequilibrium risk premium measures are modelled by the multivariate DCC-GARCH model including a deterministic crisis variable. The model describes simultaneously the risk premia dynamics due to endogenous amplifications of volatility and to exogenous idiosyncratic shocks (contagion, having controlled for fundamentals effects in the first step. Our approach allows us to achieve two goals: (i to identify the disequilibria generated by irrational behaviours of the agents, which cause increasing in volatility that is not explained by the economic fundamentals but is endogenous to financial markets, and (ii to assess the existence of contagion effect defined by exogenous shift in cross-country return correlations during crisis periods. Our results show evidence of contagion from the United States to United Kingdom, Japan, France, and Italy during the financial crisis which started in 2007-08.

  19. Cost effective second generation AC-modules: Development and testing aspects

    International Nuclear Information System (INIS)

    Islam, Saiful; Woyte, Achim; Belmans, Ronnie; Heskes, Peter; Rooij, P.M.; Hogedoorn, Ron

    2006-01-01

    In the framework of the European research project PV2GO, a new AC-module inverter was developed, taking into account all relevant aspects from a European market's point of view (standards, market, application, and research and development goals). The project goal was to achieve the overall system costs of 3 Euro per Wp for a modular plug-and-play photovoltaic system. For the photovoltaic-module, a standard 130-Wp Eurosolare module was chosen. The research and development (R and D) goal was to develop an advanced DC-control system consisting of a state-of-the-art programmable digital device and an Application Specific Integrated Circuit (ASIC) for the AC-control of the inverter. According to the topology concept, thermal and magnetic designs were optimized with regard to production technology and packaging for large-scale production. The new AC-modules were tested in a number of field-test sites in various parts of Europe and their reliability was assessed through Highly Accelerated Stress Tests. Efficiency and power quality have been tested in the laboratory. Further in the PV2GO project an optimization study of the manufacturing process of the new generation of AC-modules for high volume output was done. Another task was the pre-certification procedure to assure compliance with the European guidelines and standards

  20. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...

  1. Developing procedures for the handling of highly radioactive materials

    International Nuclear Information System (INIS)

    Wagner, M.L.

    1994-01-01

    Handling procedures for highly radioactive materials must be analyzed for the reduction of radiation dose. In keeping with ALARA principles, time, distance, and shielding must be used to maximum benefit during the job. After an initial risk assessment is accomplished, job pre-planning meetings and cold open-quotes walk-throughsclose quotes are held in order to engineer the best workable procedure given allocated resources, and to reduce personnel exposure. This paper shows the relationship between each step in the job development, over a number of actual jobs, drawing out how subtle changes in practice can affect the individual and team radiation dose

  2. 40 CFR 63.9915 - What test methods and other procedures must I use to demonstrate initial compliance with dioxin...

    Science.gov (United States)

    2010-07-01

    ... must I use to demonstrate initial compliance with dioxin/furan emission limits? 63.9915 Section 63.9915....9915 What test methods and other procedures must I use to demonstrate initial compliance with dioxin... limit for dioxins/furans in Table 1 to this subpart, you must follow the test methods and procedures...

  3. A field test of substance use screening devices as part of routine drunk-driving spot detection operating procedures in South Africa.

    Science.gov (United States)

    Matzopoulos, Richard; Lasarow, Avi; Bowman, Brett

    2013-10-01

    This pilot study aimed to test four substance use screening devices developed in Germany under local South African conditions and assess their utility for detecting driving under the influence of drugs (DUID) as part of the standard roadblock operations of local law enforcement agencies. The devices were used to screen a sample of motorists in the Gauteng and Western Cape provinces. The motorists were diverted for screening at roadblocks at the discretion of the law enforcement agencies involved, as per their standard operating procedures. Fieldworkers also administered a questionnaire that described the screening procedure, as well as information about vehicles, demographic information about the motorists and their attitudes to the screening process during testing. Motorists tested positive for breath alcohol in 28% of the 261 cases tested. Oral fluid was screened for drugs as per the standard calibrated cut-offs of all four devices. There were 14 cases where the under-influence drivers tested positive for alcohol and drugs simultaneously, but 14% of the 269 drivers drug-screened tested positive for drugs only. After alcohol, amphetamine, methamphetamine and cocaine were the most common drugs of impairment detected. The results suggest that under normal enforcement procedures only 76% of drivers impaired by alcohol and other drugs would have been detected. In more than 70% of cases the tests were administered within 5 min and this is likely to improve with more regular use. It was clear that the pilot screening process meets global testing standards. Although use of the screening devices alone would not serve as a basis for prosecution and provisions would need to be made for the confirmation of results through laboratory testing, rollout of this screening process would improve operational efficiency in at least two ways. Firstly, the accuracy of the tests will substantially decrease confirmatory test loads. Secondly, laboratory drug testing can be restricted to

  4. A procedure for the assessment of low frequency noise complaints.

    Science.gov (United States)

    Moorhouse, Andy T; Waddington, David C; Adams, Mags D

    2009-09-01

    The development and application of a procedure for the assessment of low frequency noise (LFN) complaints are described. The development of the assessment method included laboratory tests addressing low frequency hearing threshold and the effect on acceptability of fluctuation, and field measurements complemented with interview-based questionnaires. Environmental health departments then conducted a series of six trials with genuine "live" LFN complaints to test the workability and usefulness of the procedure. The procedure includes guidance notes and a pro-forma report with step-by-step instructions. It does not provide a prescriptive indicator of nuisance but rather gives a systematic procedure to help environmental health practitioners to form their own opinion. Examples of field measurements and application of the procedure are presented. The procedure and examples are likely to be of particular interest to environmental health practitioners involved in the assessment of LFN complaints.

  5. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  6. 76 FR 65616 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Central Air...

    Science.gov (United States)

    2011-10-24

    ... pages 2- 3. Both the American Heating and Refrigeration Institute (AHRI) and Trane stated that the... untested split system combinations for SEER and HSPF. \\4\\ ARMs are computer simulations used to rate... procedure, which is detailed in section 0, and comprises whole system testing, not testing or simulation of...

  7. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  8. Development of quality assurance procedures for research and development

    Energy Technology Data Exchange (ETDEWEB)

    Nam, Ji Hee

    2000-12-01

    The complexity and the diversity of R and D project are increasing and the life cycle in science and technology is getting shorter. It is required that the results of research and development are subject to prove their objectivity. KAERI is performing complex and various R and D projects. It is necessary that the principle of R and D QA should be applicated to projects for the efficient conduct of R and D and the objective and fair evaluation of the results. So, such requirements as are commonly applicable and necessary, regardless of the type of project and the degree of risk, are selected and QA procedures are established therewith.

  9. Development of quality assurance procedures for research and development

    International Nuclear Information System (INIS)

    Nam, Ji Hee

    2000-12-01

    The complexity and the diversity of R and D project are increasing and the life cycle in science and technology is getting shorter. It is required that the results of research and development are subject to prove their objectivity. KAERI is performing complex and various R and D projects. It is necessary that the principle of R and D QA should be applicated to projects for the efficient conduct of R and D and the objective and fair evaluation of the results. So, such requirements as are commonly applicable and necessary, regardless of the type of project and the degree of risk, are selected and QA procedures are established therewith

  10. Development and Application of a Two-Tier Multiple-Choice Diagnostic Test for High School Students' Understanding of Cell Division and Reproduction

    Science.gov (United States)

    Sesli, Ertugrul; Kara, Yilmaz

    2012-01-01

    This study involved the development and application of a two-tier diagnostic test for measuring students' understanding of cell division and reproduction. The instrument development procedure had three general steps: defining the content boundaries of the test, collecting information on students' misconceptions, and instrument development.…

  11. Development on inspection and recognition procedure of clearance level of radioactivity in metal wastes, to secure social safety for reused metals

    International Nuclear Information System (INIS)

    Hattori, Takatoshi

    2002-01-01

    The Central Research Institute of Electric Power Industry developed a new procedure automatically measurable on radioactivity level in metal wastes in high precision by using the newest three-dimensional (3D) shape measuring technology and 3D Monte-Carlo computing technology (a code to probabilistically compute formation and movement of gamma-ray from metal wastes to detectors) to contribute to inspection and recognition of clearance level of radioactivity. This procedure can prove no super micro amount of radioactivity of 250 Bq in metal wastes of testing objects. As this proof is an evaluation of conservative safety side showing no pollution at any 100 sq cm of surface of the metal wastes on considering for taking-out reference on matters, for its price, the procedure cancelled all of labors to test all of metal wastes surfaces by survey meter, and so on, and feasibility of overlook of pollution at places difficult to measure by using survey meters can perfectly excluded. Its practical tester is planned to produce at 2002 fiscal year, and testing performance against actual metal wastes is planned to confirm by its proof-test on 2003 to 2004 fiscal years. (G.K.)

  12. Developments in the preparation of operating procedures for emergency conditions of nuclear power plants

    International Nuclear Information System (INIS)

    1985-06-01

    In recent years a substantial effort has been devoted by the nuclear community to extend Emergency Operating Procedures (EOPs) to cover all conceivable events and to develop procedure formats that transmit the essential guidance to operators in an optimum way. The information given in this report is based upon the most recent developments in formulating and applying EOPs. It should therefore provide guidance to those involved in preparing or reviewing EOPs on the scope, technical basis, organization and format of such procedures. It also outlines the actions required to validate the adequacy and applicability of these procedures so that the correct operator actions are achieved. Examples are given to illustrate the developments in some Member States

  13. Current status of technology development for fabrication of Indian Test Blanket Module (TBM) of ITER

    Energy Technology Data Exchange (ETDEWEB)

    Jayakumar, T., E-mail: tjk@igcar.gov.in [Metallurgy and Materials Group, Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam 603102 (India); Rajendra Kumar, E. [TBM Division, Institute for Plasma Research (IPR), Bhat, Gandhinagar 382428 (India)

    2014-10-15

    Highlights: • Status of technology developments for Indian TBM to be installed in ITER is presented. • Procedure development for EB, laser and laser-hybrid welding of RAFM steel presented. • Filler wires for RAFM steel for TIG, NG-TIG and laser-hybrid welding have been developed. • Feasibility of production of channel plate by HIP technology has been demonstrated. - Abstract: Ever since India decided to install its Lead-Lithium Ceramic Breeder (LLCB) TBM in ITER, various technologies for fabrication of Indian TBM are being pursued by IPR and IGCAR, in collaboration with various research laboratories in India. Welding consumables for joining India specific RAFM steels (IN-RAFMS), procedures for hot isostatic pressing, electron beam welding, laser and laser-hybrid welding have been developed. Considering the complex nature and limited access available for inspection, innovative inspection procedures that involved use of phased array ultrasonic and C-scan imaging are also being pursued. This paper presents the current status of these developments and provides a roadmap for the future activities planned in realizing Indian TBM for testing in ITER.

  14. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  15. Creep-fatigue assessment of a thermina test specimen using the R5 procedure

    International Nuclear Information System (INIS)

    Booth, P.; Budden, P.J.; Bate, S.K.

    1997-01-01

    A creep-fatigue life assessment of an axisymmetric 316 stainless steel test specimen under constant mechanical and cyclic thermal shock loading using the R5 Procedure is described in this paper. This test was carried out at CEA, France, and formed part of the 'Thermina' series. Stress analysis has been carried out using both full inelastic finite element analysis and also the simplified shakedown methods, based on elastic calculation, within R5. The estimates of strain range and the stress at the start of the creep dwell have then been used with R5 to estimate creep and fatigue damage per cycle and hence to make predictions of component life. The predicted lives are compared with the lives observed in the tests. The simplified R5 estimate of life, based on development of a crack of depth 200 microns, is 260 cycles using best-estimate material properties. Experimentally, cracks of depth at least 150 microns were observed in between 526 and 650 cycles, for two similar tests. The simplified R5 route therefore leads to an estimate of life which is conservative but not unduly so on this component. Detailed cyclic inelastic analysis using the ORNL constitutive model and the ABAQUS finite element code to estimate the strain range and dwell stress led to a best estimate of 618 cycles to crack initiation using R5. (author). 16 refs, 11 figs, 4 tabs

  16. Relations among conceptual knowledge, procedural knowledge, and procedural flexibility in two samples differing in prior knowledge.

    Science.gov (United States)

    Schneider, Michael; Rittle-Johnson, Bethany; Star, Jon R

    2011-11-01

    Competence in many domains rests on children developing conceptual and procedural knowledge, as well as procedural flexibility. However, research on the developmental relations between these different types of knowledge has yielded unclear results, in part because little attention has been paid to the validity of the measures or to the effects of prior knowledge on the relations. To overcome these problems, we modeled the three constructs in the domain of equation solving as latent factors and tested (a) whether the predictive relations between conceptual and procedural knowledge were bidirectional, (b) whether these interrelations were moderated by prior knowledge, and (c) how both constructs contributed to procedural flexibility. We analyzed data from 2 measurement points each from two samples (Ns = 228 and 304) of middle school students who differed in prior knowledge. Conceptual and procedural knowledge had stable bidirectional relations that were not moderated by prior knowledge. Both kinds of knowledge contributed independently to procedural flexibility. The results demonstrate how changes in complex knowledge structures contribute to competence development.

  17. Testing declarative memory in laboratory rats and mice using the nonconditioned social discrimination procedure.

    Science.gov (United States)

    Engelmann, Mario; Hädicke, Jana; Noack, Julia

    2011-07-14

    Testing declarative memory in laboratory rodents can provide insights into the fundamental mechanisms underlying this type of learning and memory processing, and these insights are likely to be applicable to humans. Here we provide a detailed description of the social discrimination procedure used to investigate recognition memory in rats and mice, as established during the last 20 years in our laboratory. The test is based on the use of olfactory signals for social communication in rodents; this involves a direct encounter between conspecifics, during which the investigatory behavior of the experimental subject serves as an index for learning and memory performance. The procedure is inexpensive, fast and very reliable, but it requires well-trained human observers. We include recent modifications to the procedure that allow memory extinction to be investigated by retroactive and proactive interference, and that enable the dissociated analysis of the central nervous processing of the volatile fraction of an individual's olfactory signature. Depending on the memory retention interval under study (short-term memory, intermediate-term memory, long-term memory or long-lasting memory), the protocol takes ~10 min or up to several days to complete.

  18. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  19. Development of Technique for Testing the Long-Term Stability of Silicon Microstrip Detectors

    International Nuclear Information System (INIS)

    Kosinov, A.V.; Maslov, N.I.; Naumov, S.V.; Ovchinnik, V.D.; Starodubtsev, A.F.; Vasiliev, G.P.; Yalovenko, V.I.; Bosisio, L.

    2006-01-01

    An automatic multi-channel set-up prototype for simultaneous testing of the Long-Term Stability (LTS) of more than ten detectors is described. The Inner Tracking System of the ALICE experiment will include about two thousand Double-sided Microstrip Detectors (DSMD). Efficient automatic measurement techniques are crucial for the LTS test, because the corresponding test procedure should be performed on each detector and requires long time, at least two days. By using special adapters for supporting and connecting the bare DSMDs, failing detectors can be screened out before module assembly, thus minimizing the cost. Automated probe stations developed for a special purpose or for microelectronics industry are used for measuring physical static DSMD characteristics and check good-to-bad elements ratio for DSMD. However, automated (or semi-automatic)test benches for studying LTS or testing DSMD long-term stability before developing a detecting module are absent

  20. Long term leaching of silicate systems: testing procedure, actinides behaviour and mechanism

    International Nuclear Information System (INIS)

    Louwrier, K.; Matzke, H.; Ray, I.; Thiele, H.; Scheffler, K.; Riege, U.

    1977-06-01

    High-level waste borosilicate glasses and medium-level waste cement products have been leached with various aqueous solutions at ambient temperature. The leach rates of americium and plutonium are determined as well as the behaviour of the actinides in the boundary surface glass/leachant and in the leachant itself. Methods like light-scattering photometry and differential refractometry, molecular filtration, scanning electron microscopy and α-spectrometry of the energy-loss of α-particles in thin layers have been applied. From the experimental results a general model for the leaching mechanism has been established. A critical review of leach test procedures is accomplished aiming at the improvement of common tests with respect to the extrapolation of the obtained leach test data to final disposal safety considerations. (orig.) [de

  1. Development of equally intelligible Telugu sentence-lists to test speech recognition in noise.

    Science.gov (United States)

    Tanniru, Kishore; Narne, Vijaya Kumar; Jain, Chandni; Konadath, Sreeraj; Singh, Niraj Kumar; Sreenivas, K J Ramadevi; K, Anusha

    2017-09-01

    To develop sentence lists in the Telugu language for the assessment of speech recognition threshold (SRT) in the presence of background noise through identification of the mean signal-to-noise ratio required to attain a 50% sentence recognition score (SRTn). This study was conducted in three phases. The first phase involved the selection and recording of Telugu sentences. In the second phase, 20 lists, each consisting of 10 sentences with equal intelligibility, were formulated using a numerical optimisation procedure. In the third phase, the SRTn of the developed lists was estimated using adaptive procedures on individuals with normal hearing. A total of 68 native Telugu speakers with normal hearing participated in the study. Of these, 18 (including the speakers) performed on various subjective measures in first phase, 20 performed on sentence/word recognition in noise for second phase and 30 participated in the list equivalency procedures in third phase. In all, 15 lists of comparable difficulty were formulated as test material. The mean SRTn across these lists corresponded to -2.74 (SD = 0.21). The developed sentence lists provided a valid and reliable tool to measure SRTn in Telugu native speakers.

  2. Developing of impact and fatigue property test database system

    International Nuclear Information System (INIS)

    Park, S. J.; Jun, I.; Kim, D. H.; Ryu, W. S.

    2003-01-01

    The impact and fatigue characteristics database systems were constructed using the data produced from impact and fatigue test and designed to hold in common the data and programs of tensile characteristics database that was constructed on 2001 and others characteristics databases that will be constructed in future. We can easily get the basic data from the impact and fatigue characteristics database systems when we prepare the new experiment and can produce high quality result by compare the previous data. The development part must be analysis and design more specific to construct the database and after that, we can offer the best quality to customers various requirements. In this thesis, we describe the procedure about analysis, design and development of the impact and fatigue characteristics database systems developed by internet method using jsp(Java Server pages) tool

  3. New design procedure development of future reactor critical power estimation. (1) Practical design-by-analysis method for BWR critical power design correlation

    International Nuclear Information System (INIS)

    Yamamoto, Yasushi; Mitsutake, Toru

    2007-01-01

    For present BWR fuels, the full mock-up thermal-hydraulic test, such as the critical power measurement test, pressure drop measurement test and so on, has been needed. However, the full mock-up test required the high costs and large-scale test facility. At present, there are only a few test facilities to perform the full mock-up thermal-hydraulic test in the world. Moreover, for future BWR, the bundle size tends to be larger, because of reducing the plant construction costs and minimizing the routine check period. For instance, AB1600, improved ABWR, was proposed from Toshiba, whose bundle size was 1.2 times larger than the conventional BWR fuel size. It is too expensive and far from realistic to perform the full mock-up thermal-hydraulic test for such a large size fuel bundle. The new design procedure is required to realize the large scale bundle design development, especially for the future reactor. Therefore, the new design procedure, Practical Design-by-Analysis (PDBA) method, has been developed. This new procedure consists of the partial mock-up test and numerical analysis. At present, the subchannel analysis method based on three-fluid two-phase flow model only is a realistic choice. Firstly, the partial mock-up test is performed, for instance, the 1/4 partial mock-up bundle. Then, the first-step critical power correlation coefficients are evaluated with the measured data. The input data, such as the spacer effect model coefficient, on the subchannel analysis are also estimated with the data. Next, the radial power effect on the critical power of the full-bundle size was estimated with the subchannel analysis. Finally, the critical power correlation is modified by the subchannel analysis results. In the present study, the critical power correlation of the conventional 8x8 BWR fuel was developed with the PDBA method by 4x4 partial mock-up tests and the subchannel analysis code. The accuracy of the estimated critical power was 3.8%. The several themes remain to

  4. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  5. 29 CFR 1928.52 - Protective frames for wheel-type agricultural tractors-test procedures and performance requirements.

    Science.gov (United States)

    2010-07-01

    ... a 4,410-lb (2,000-kg) weight acting as a pendulum. The impact face of the weight shall be 27 ± 1 in..., or blocking shift or break during the test, the test shall be repeated. (ii) H = Vertical height of... test procedure; and (C) Impact at side. The blocking and restraining shall conform to paragraphs (d)(3...

  6. Pre-exposure to food temptation reduces subsequent consumption: A test of the procedure with a South-African sample.

    Science.gov (United States)

    Duh, Helen Inseng; Grubliauskiene, Aiste; Dewitte, Siegfried

    2016-01-01

    It has been suggested that the consumption of unhealthy Westernized diet in a context of poverty and resultant food insecurity may have contributed to South-Africa's status of the third fattest country in the World. Considering that a number of South-Africans are reported to have experienced, or are still experiencing food insecurity, procedures which have been shown to reduce the consumption of unhealthy food in higher income countries may be ineffective in South-Africa. We thus tested the robustness of the so called pre-exposure procedure in South-Africa. We also tested the moderating role of childhood poverty in the pre-exposure procedure. With the pre-exposure procedure, a respondent is exposed to a tempting unhealthy food (e.g. candy) in a context that is designed such that eating the food interferes with a task goal. The typical result is that this procedure spills over and reduces consumption of similar tempting food later on. An experimental study conducted in a South-African laboratory showed that the pre-exposure effect is robust even with a sample, where food insecurity prevails. Childhood poverty did not moderate the effect. This study proves that behavioral procedures aimed at reducing the consumption of unhealthy food would be valuable in less rich non-Western countries. Further testing of the robustness of the pre-exposure effect is however recommended in other poorer food insecure countries. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Standing operating procedures for developing acute exposure guideline levels for hazardous chemicals

    National Research Council Canada - National Science Library

    National Research Council (U.S.). Subcommittee on Acute Exposure Guideline Levels

    2001-01-01

    Standing Operating Procedures for Developing Acute Exposure Guideline Levels for Hazardous Chemicals contains a detailed and comprehensive methodology for developing acute exposure guideline levels (AEGLs...

  8. Leaching study of contaminated and remediated soil and dredged sludge and development of a fast testing procedure for determining the leachability of contaminants; Uitloogonderzoek aan verontreinigde en gereinigde grond en baggerspecie en ontwikkeling van verkorte proceudres ter bepaling van de uitloging

    Energy Technology Data Exchange (ETDEWEB)

    Zevenbergen, C.; Frapporti, G.; Keyzer, J.; Heynen, J.J.M.

    1997-08-01

    A large study, performed jointly by ECN and IWACO, in which the effect of soil remediation on the leachability of contaminants from soils was investigated, is summarized. The study included two specific aims, which are treated in more detail in two separate reports: (1) The development of a fast testing procedure for determining the leachability of pollutants from contaminated and treated soils, which allows for an assessment relative to the regulatory limits stated in the Dutch Building Materials Decree; and (2) To develop a better understanding of the physico-chemical processes underlying the leachability of contaminants, including the development of a model for the leaching of pollutants from contaminated and treated soils and dredged sludge. The development of a fast testing procedure is reported in this report. The study of physico-chemical processes is reported in `Speciation of metals in contaminated and remediated soil and dredged sludge. Leaching processes and controlling factors` (ECN-C--96-084). The contaminants dealt with in this report are arsenic, copper, cadmium, mercury, lead, zinc, and cyanide, as well as a limited amount of contaminated and remediated aquatic sediments. 13 figs., 2 tabs, 8 refs.

  9. Experimental Testing Procedures and Dynamic Model Validation for Vanadium Redox Flow Battery Storage System

    DEFF Research Database (Denmark)

    Baccino, Francesco; Marinelli, Mattia; Nørgård, Per Bromand

    2013-01-01

    The paper aims at characterizing the electrochemical and thermal parameters of a 15 kW/320 kWh vanadium redox flow battery (VRB) installed in the SYSLAB test facility of the DTU Risø Campus and experimentally validating the proposed dynamic model realized in Matlab-Simulink. The adopted testing...... efficiency of the battery system. The test procedure has general validity and could also be used for other storage technologies. The storage model proposed and described is suitable for electrical studies and can represent a general model in terms of validity. Finally, the model simulation outputs...

  10. Development of quality assurance and performance testing for the Process Experimental Pilot Plant

    International Nuclear Information System (INIS)

    Dole, L.R.; McDaniel, E.W.; Robinson, S.M.

    1984-08-01

    The Process Experimental Pilot Plant (PREPP) is planned for operation by EG and G Idaho, Inc., to demonstrate a full-scale, cement-based, disposal process for transuranic (TRU) wastes. Procedures need to be developed to determine the quality of the waste product during processing and the durability of the final waste form produced in this facility. This report summarizes basic guidelines for the selection of the waste form composition and process conditions that affect product performance. Physical property tests that may be applicable for quality assurance during processing are also described. Approaches to accelerated performance tests needed to predict the performance of the cement-based waste form are identified, and suggestions are made for the development of processing tests to ensure the quality of the final waste-host product. 29 references, 3 figures, 4 tables

  11. Development of quality assurance and performance testing for the Process Experimental Pilot Plant

    International Nuclear Information System (INIS)

    Dole, L.R.; McDaniel, E.W.; Robinson, S.M.

    1984-06-01

    The Process Experimental Pilot Plant (PREPP) is planned for operation by EG and G Idaho, Inc., to demonstrate a full-scale, cement-based, disposal process for transuranic (TRU) wastes. Procedures need to be developed to determine the quality of the waste product during processing and the durability of the final waste form produced in this facility. This report summarizes basic guidelines for the selection of the waste form composition and process conditions that affect product performance. Physical property tests that may be applicable for quality assurance during processing are also described. Approaches to accelerated performance tests needed to predict the performance of the cement-based waste form are identified, and suggestions are made for the development of processing tests to assure the quality of the final waste-host product. 29 references, 3 figures, 3 tables

  12. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  13. Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

    Science.gov (United States)

    Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

  14. 34 CFR 303.342 - Procedures for IFSP development, review, and evaluation.

    Science.gov (United States)

    2010-07-01

    ... development, review, and evaluation. (a) Meeting to develop initial IFSP—timelines. For a child who has been... process. Therefore, it is necessary to have only one separate periodic review each year (i.e., six months... 34 Education 2 2010-07-01 2010-07-01 false Procedures for IFSP development, review, and evaluation...

  15. Containment integrity and leak testing. Procedures applied and experiences gained in European countries

    International Nuclear Information System (INIS)

    1987-01-01

    Containment systems are the ultimate safety barrier for preventing the escape of gaseous, liquid and solid radioactive materials produced in normal operation, not retained in process systems, and for keeping back radioactive materials released by system malfunction or equipment failure. A primary element of the containment shell is therefore its leak-tight design. The report describes the present containment concepts mostly used in European countries. The leak-testing procedures applied and the experiences gained in their application are also discussed. The report refers more particularly to pre-operational testing, periodic testing and extrapolation methods of leak rates measured at test conditions to expected leak rates at calculated accident conditions. The actual problems in periodic containment leak rate testing are critically reviewed. In the appendix to the report a summary is given of the regulations and specifications applied in different member countries

  16. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  17. A Software Prototype Development of Human System Interfaces for Human Factors Engineering Validation Tests of SMART MCR

    International Nuclear Information System (INIS)

    Lim, Jong Tae; Kang, Young Sun; Park, Byung Yul; Han, Kwan Ho; Yang, Sung Won; Oh, In Su; Kim, Myung Ju; Bae, Mun Jin; Nam, Gi Ho; Lim, Do Yeun

    2009-12-01

    This report's aim is to develop a software prototype that will be used in the partial dynamic mockup of SMART MCR(main control room). The software mainly consist of the plant a dynamic model and various operation displays that will be installed into MCR. They includes the codes such as main data processing logics like alarm reduction logic and display methods like ecological interface display and elastic tile alarm display developed by KAERI. The unit test and integrated test of them are performed according to predefined test procedure

  18. Procedure guideline for radioiodine test (version 3); Verfahrensanweisung zum Radioiodtest (Version 3)

    Energy Technology Data Exchange (ETDEWEB)

    Dietlein, M.; Schicha, H. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Koeln Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Dressler, J. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Nuklearmedizinische Klinik der Henriettenstiftung, Hannover (Germany); Eschner, W. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Deutsche Gesellschaft fuer Medizinische Physik (DGMP) (Germany); Koeln Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Lassmann, M. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Deutsche Gesellschaft fuer Medizinische Physik (DGMP) (Germany); Wuerzburg Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Leisner, B. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Allgemeines Krankenhaus St. Georg, Hamburg (Germany). Abt. fuer Nuklearmedizin; Reiners, C. [Deutsche Gesellschaft fuer Nuklearmedizin (DGN) (Germany); Wuerzburg Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin

    2007-07-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  19. Development of Radioanalytical and Microanalytical Procedures for the Determination of Actinides in Environmental Samples

    International Nuclear Information System (INIS)

    Macsik, Zsuzsanna; Vajda, Nora; Bene, Balazs; Varga, Zsolt

    2008-01-01

    A radio-analytical procedure has been developed for the simultaneous determination of actinides in swipe samples by alpha-spectrometry after the separation of the actinides by extraction chromatography. The procedure is based on the complete decomposition of the sample by destruction with microwave digestion or ashing in furnace. Actinides are separated on an extraction chromatographic column filled with TRU resin (product of Eichrom Industries Inc.). Alpha sources prepared from the separated fractions of americium, plutonium, thorium and uranium are counted by alpha spectrometry. Micro-analytical procedure is being developed for the location and identification of individual particles containing fissile material using solid state nuclear track detectors. The parameters of alpha and fission track detection have been optimized and a procedure has been elaborated to locate the particles on the sample by defining the coordinates of the tracks created by the particles on the track detector. Development of a procedure is planned to separate the located particles using micromanipulator and these particles will be examined individually by different micro- and radio-analytical techniques. (authors)

  20. Development of Radioanalytical and Microanalytical Procedures for the Determination of Actinides in Environmental Samples

    Energy Technology Data Exchange (ETDEWEB)

    Macsik, Zsuzsanna [Institute of Nuclear Techniques, Moegyetem rakpart 9, H-1111 Budapest (Hungary); Vajda, Nora [RadAnal Ltd., Bimbo ut 119/a, H-1026 Budapest (Hungary); Bene, Balazs [National Institute of Standards and Technology, Gaithersburg, MD 20899 (United States); Varga, Zsolt [Institute of Isotopes, Konkoly-Thege M. ut 29-33, H-1121 Budapest (Hungary)

    2008-07-01

    A radio-analytical procedure has been developed for the simultaneous determination of actinides in swipe samples by alpha-spectrometry after the separation of the actinides by extraction chromatography. The procedure is based on the complete decomposition of the sample by destruction with microwave digestion or ashing in furnace. Actinides are separated on an extraction chromatographic column filled with TRU resin (product of Eichrom Industries Inc.). Alpha sources prepared from the separated fractions of americium, plutonium, thorium and uranium are counted by alpha spectrometry. Micro-analytical procedure is being developed for the location and identification of individual particles containing fissile material using solid state nuclear track detectors. The parameters of alpha and fission track detection have been optimized and a procedure has been elaborated to locate the particles on the sample by defining the coordinates of the tracks created by the particles on the track detector. Development of a procedure is planned to separate the located particles using micromanipulator and these particles will be examined individually by different micro- and radio-analytical techniques. (authors)