    COMMAND TEST OPERATIONS PROCEDURE *Test Operations Procedure 06-2-301 14 June 2017 DTIC AD No. WIND TESTING Page Paragraph 1. SCOPE...item requirements and the test objectives, determine the wind speed test points for each configuration determined in paragraph 4.4. Typically these

  2. Braking, Wheeled Vehicles. Test Operations Procedure (TOP)

    Science.gov (United States)

    2008-05-20

    are as follows: a. Micrometer calipers (inside, outside, and dial types). b. Surface finish gauges. c. Torque wrench. d. Brake shoe...HAZARDOUS CONDITION • The power assist unit fails to operate. 10. Front Drum Brakes Procedure: Equipment needed: Steel scale or Vernier ... Micrometer and dial indicator. Reject the vehicle if: • Rotors are broken or damaged, or cracks on the surface extend to the outer edges. • Two grooves

  3. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    presentation. Excludes off-road mobility problems created by brush trees, and solid objects. 5-18 TECOM Pam 310-4 2-2-620 AD-AO19244 13 Nov 75 RESISTANCE...FUNCTIONAL TEETING , AIRBORNE NAVIGATION EQUIPMENT Provides guidance and procedures for performance testing airborne naviga- tion. equipment. Addresses...testing under arctic conditions. 8-4-014 AD-867022 26 Nov 69 ARCTIC ENVIRONMENTAL TEET OF WATER HANDLING, WATER STORAGE, AND WATER PURIFICATION EQUIPMENT

  4. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public... Corrosion Testing at ARL 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Thomas A Considine 5d. PROJECT NUMBER NA

  5. Operability test procedure [Tank] 241-SY-101 equipment removal system

    Energy Technology Data Exchange (ETDEWEB)

    Mast, J.C.

    1994-12-08

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.

  6. Project W-320, operational test procedure OTP-320-003 test report

    Energy Technology Data Exchange (ETDEWEB)

    Bevins, R.R.

    1998-07-23

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B.

  7. Test Operations Procedure (TOP) 01-2-603 Rotorcraft Laboratory Vibration Test Schedules

    Science.gov (United States)

    2017-06-12

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 01-2-603 Rotorcraft Laboratory Vibration Test Schedules...This TOP provides Laboratory Vibration Test Schedules (LVTS) for selected rotary wing aircraft. The LVTS presented in this TOP were developed from... vibration environment of a given rotary wing platform in a laboratory setting. 15. SUBJECT TERMS Laboratory Vibration Test Schedule (LVTS

  8. Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

    Science.gov (United States)

    Martin, J. J.; Reid, R. S.

    2010-01-01

    Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

  9. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  10. Test Operations Procedure (TOP) 02-1-100 Anthropomorphic Test Device Operation and Setup

    Science.gov (United States)

    2016-02-09

    5 APPENDIX A. D4D OPERATOR GUIDE. g. The bottom portion of the enclosure is an aluminum block that has been machined . All of the data...Excitation current limit Fuse shared by four channels Electronic shutdown per channel A short on the D4D may require several minutes to clear...Fahrenheit for an extended period, then the controller shuts down the electronics on the channel boards. In the case of a shutdown , the cooler is left

  11. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  12. Safety testing and operational procedures for self-developed radiofrequency coils.

    Science.gov (United States)

    Hoffmann, Jens; Henning, Anke; Giapitzakis, Ioannis A; Scheffler, Klaus; Shajan, G; Pohmann, Rolf; Avdievich, Nikolai I

    2016-09-01

    The development of novel radiofrequency (RF) coils for human ultrahigh-field (≥7 T), non-proton and body applications is an active field of research in many MR groups. Any RF coil must meet the strict requirements for safe application on humans with respect to mechanical and electrical safety, as well as the specific absorption rate (SAR) limits. For this purpose, regulations such as the International Electrotechnical Commission (IEC) standard for medical electrical equipment, vendor-suggested test specifications for third party coils and custom-developed test procedures exist. However, for higher frequencies and shorter wavelengths in ultrahigh-field MR, the RF fields may become extremely inhomogeneous in biological tissue and the risk of localized areas with elevated power deposition increases, which is usually not considered by existing safety testing and operational procedures. In addition, important aspects, such as risk analysis and comprehensive electrical performance and safety tests, are often neglected. In this article, we describe the guidelines used in our institution for electrical and mechanical safety tests, SAR simulation and verification, risk analysis and operational procedures, including coil documentation, user training and regular quality assurance testing, which help to recognize and eliminate safety issues during coil design and operation. Although the procedure is generally applicable to all field strengths, specific requirements with regard to SAR-related safety and electrical performance at ultrahigh-field are considered. The protocol describes an internal procedure and does not reflect consensus among a large number of research groups, but rather aims to stimulate further discussion related to minimum coil safety standards. Furthermore, it may help other research groups to establish their own procedures. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  13. Test Operation Procedure (TOP) 01-1-010A Vehicle Test Course Severity (Surface Roughness)

    Science.gov (United States)

    2017-12-12

    Paragraph 1. SCOPE ................................................................................... 2 2. FACILITIES...ATEC) Test Center facilities are provided in Section 5, in the following paragraphs : a. ATC courses, paragraph 5.1. b. YTC courses, paragraph ...5.2. c. TRTC courses, paragraph 5.3. 3. MONITORING TEST COURSE SURFACE ROUGHNESS. Test course roughness is monitored using several techniques

  14. CHANGES IN OPERATING PROCEDURES FOR AEROSOL CONCENTRATION UNIFORMITY FOR PM2.5 AND PM10 SAMPLER TESTING

    Science.gov (United States)

    This technical note documents changes in the standard operating procedures used at the Environmental Protection Agency's (U.S. EPA) aerosol testing wind tunnel facility for testing of particulate matter monitoring methods of PM2.5 and PM10. These changes are relative to the op...

  15. Plans for National Ignition Facility operations training and operations procedures

    Energy Technology Data Exchange (ETDEWEB)

    Mantrom, D.D., LLNL

    1998-06-01

    A preliminary plan for National Ignition Facility (NIF) Operations training developed for the 200+ staff anticipated to operate the NIF facility is discussed. We also address the development and implementation of NIF Operations procedures. These procedures serve as an essential part of the staff training program. A special aspect of NIF Operations procedures is that they will be on-line with electronic links to design, operations, and test databases, and will likely incorporate electronic checklists and archiving capabilities.

  16. Test Operations Procedure (TOP) 02-2-607 Cooling Systems (Automotive)

    Science.gov (United States)

    2006-09-27

    near) full throttle conditions. (4) A towing dynamometer can be used to simulate small grades depending on the capabilities of the dynamometer ...4.3 Full Load Cooling Tests (Wide Open Throttle) 9 4.4 Road-load Cooling Tests (Without a Field Dynamometer ) 12 4.5 Auxiliary Engine Tests...Measuring Permissible Measurement Uncertainty Mobile field dynamometer as required, (applicable resistive load

  17. Test Operations Procedure (TOP) 03-2-709 Field Artillery Fire Control Sights

    Science.gov (United States)

    2010-11-19

    Requirement (Continued) Rain Test Chamber Reference 1, Appendix E Humidity Test Chamber Reference 1, Appendix E Solar Radiation Test Chamber...meters ± 50 meters from the weapon muzzle. Target should be constructed of wood, tarp or any other material that will easily register the round impacts...shocks at extreme temperatures and the effects of solar radiation, rain, and humidity. TOP 03-2-709 19 November 2010 16 4.4.1 Extreme

  18. D10.8.1: Test and operation of the couplers preparation procedure

    CERN Document Server

    Napoly, O

    2013-01-01

    As far as the Task 10.8.1 is concerned the activity was to define the process of the automatic couplers cleaning, to have a full review of the different phases and to establish the necessary hardware components. After this the design of the machine and of its components has been realised. This has provided the faisability study and the costing of the automatic couplers cleaning machine. Hereafter we give a short summary of the main apects of the two phases: the definition of the automatic cleaning procedure and the study of the washing machine.

  19. Test Operations Procedure (TOP) 01-1-065 Accelerated Corrosion Durability

    Science.gov (United States)

    2013-10-15

    Scribes may be made on various surfaces of the test item. These scribes are meant to test the coating adhesion properties along with its...ratio of 6:1 by volume. Final consistency is liquid rather than mud-like. Salinity will be adjusted to 3% by the addition of a concentrated salt...Proving Ground, Maryland 21005-5001. Technical information may be obtained from the preparing activity: Automotive Directorate (TEDT-AT-AD), US

  20. Abrasion Testing of Products Containing Nanomaterials, SOP-R-2: Scientific Operating Procedure Series: Release (R)

    Science.gov (United States)

    2016-04-01

    Related Documents ASTM C 153-07 - Abrasion Resistance of Dimension Stone Subjected to Foot Traffic Using a Rotary Platform, Double-Head Abraser ASTM D...the process of wearing away by friction . Abrader - wear testing instrument to evaluate abrasion resistance; also referred to as an abraser. Abrasion...permits a return to its starting position. In the case of the rotary platform test method, it consists of one complete rotation of the specimen. ERDC

  1. Test Operations Procedure (TOP) 02-2-546 Teleoperated Unmanned Ground Vehicle (UGV) Latency Measurements

    Science.gov (United States)

    2017-01-11

    minimum of three times for comparison purposes and to establish consistency of system performance. 4.2.2 LOS Measurement. a. Perform this test ...times for comparison purposes and to establish consistency of system performance. 4.2.3 NLOS Measurement. a. Perform this test in a NLOS...REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1

  2. Test Operations Procedure (TOP) 02-2-603A Vehicle Fuel Consumption

    Science.gov (United States)

    2012-05-10

    electric drivelines. 2. FACILITIES AND INSTRUMENTATION. 2.1 Facilities. Item Requirement Level, Paved Road ( Dynamometer Test Course...gravel. Turns are lightly banked at 5 percent. Roadway Simulator (RWS) The ATC Roadway Simulator is a chassis dynamometer facility capable of full...Trailer/ towed loads free of damage to exterior surfaces that would affect aerodynamic drag. (7) Wheel alignment checked and properly adjusted

  3. Chemical and Biological Contamination Survivability (CBCS), Large Item Exteriors. Test Operations Procedure

    Science.gov (United States)

    2011-03-21

    test hypochlorite (HTH, a STB substitute); household bleach solutions (usually a ratio of one part bleach to ten parts water); alcohol - wetted cloth...solid sorbent tubes (SSTs), or equivalent. Gas chromatograph (GC), high-performance liquid chromatography (HPLC), liquid chromatography (LC...Microscopes, swabs or wipes placed in growth medium, automatic colony counters, or equivalent. Microscopes, swabs or wipes placed

  4. Toddler test or procedure preparation

    Science.gov (United States)

    Preparing toddler for test/procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... Before the test, know that your child will probably cry. Even if you prepare, your child may feel some discomfort or ...

  5. Test Operations Procedure (TOP) 08-2-197 Chemical Protection Testing of Sorbent-Based Air Purification Components (APCs)

    Science.gov (United States)

    2016-06-24

    36-8), acetic acid (AA, CAS® Number 64-19-7), and ethylene glycol (CAS® Number 107- 21-1). TOP 08-2-197 24 June 2016 A-1 APPENDIX A. TEST...2-197 24 June 2016 E-1 APPENDIX E. ABBREVIATIONS. ∆P differential pressure AA acetic acid AAPTF Advanced Air Purification Test Fixture AC...isobutyl-3-methoxypyrazine (IMP, CAS® Number 24683-00-9), dimethyl methylphosphonate (DMMP, CAS® Number 756-79-6), methyl salicylate (MeS, CAS® Number 119

  6. Use of Blast Test Device (BTD) During Auditory Blast Overpressure Measurement. Test Operations Procedure (TOP) 4-2-831

    Science.gov (United States)

    2008-08-12

    position. An IR detector was used to obtain the t-zero time for these test firings. b. PCB and Endevco type pressure transducers were used to...samples per second per channel and recorded digitally with a forty kilohertz low pass filter, while the Endevco transducers in the BTD (non-auditory

  7. Electronic Procedures for Medical Operations

    Science.gov (United States)

    2015-01-01

    Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

  8. Preschooler test or procedure preparation

    Science.gov (United States)

    Preparing preschoolers for test/procedure; Test/procedure preparation - preschooler ... Preparing children for medical tests can reduce their anxiety. It can also make them less likely to cry and resist the procedure. Research shows that ...

  9. 40 CFR 160.81 - Standard operating procedures.

    Science.gov (United States)

    2010-07-01

    ... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures... procedures shall be established for, but not limited to, the following: (1) Test system area preparation. (2...

  10. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  11. A field test of substance use screening devices as part of routine drunk-driving spot detection operating procedures in South Africa.

    Science.gov (United States)

    Matzopoulos, Richard; Lasarow, Avi; Bowman, Brett

    2013-10-01

    This pilot study aimed to test four substance use screening devices developed in Germany under local South African conditions and assess their utility for detecting driving under the influence of drugs (DUID) as part of the standard roadblock operations of local law enforcement agencies. The devices were used to screen a sample of motorists in the Gauteng and Western Cape provinces. The motorists were diverted for screening at roadblocks at the discretion of the law enforcement agencies involved, as per their standard operating procedures. Fieldworkers also administered a questionnaire that described the screening procedure, as well as information about vehicles, demographic information about the motorists and their attitudes to the screening process during testing. Motorists tested positive for breath alcohol in 28% of the 261 cases tested. Oral fluid was screened for drugs as per the standard calibrated cut-offs of all four devices. There were 14 cases where the under-influence drivers tested positive for alcohol and drugs simultaneously, but 14% of the 269 drivers drug-screened tested positive for drugs only. After alcohol, amphetamine, methamphetamine and cocaine were the most common drugs of impairment detected. The results suggest that under normal enforcement procedures only 76% of drivers impaired by alcohol and other drugs would have been detected. In more than 70% of cases the tests were administered within 5 min and this is likely to improve with more regular use. It was clear that the pilot screening process meets global testing standards. Although use of the screening devices alone would not serve as a basis for prosecution and provisions would need to be made for the confirmation of results through laboratory testing, rollout of this screening process would improve operational efficiency in at least two ways. Firstly, the accuracy of the tests will substantially decrease confirmatory test loads. Secondly, laboratory drug testing can be restricted to

  12. Development and evaluation of Standard Operating Procedures (SOPs) for quality control tests and radiological protection activities in a Nuclear Medicine Service

    Energy Technology Data Exchange (ETDEWEB)

    Krempser, Alexandre R., E-mail: krempser@peb.ufrj.br [Universidade Federal do Rio de Janeiro (PEB/COPPE/UFRJ), RJ (Brazil). Programa de Engenharia Biomedica; Soares, Alexandre B. [Universidade Federal do Rio de Janeiro (IF/UFRJ), Rio de Janeiro, RJ (Brazil). Inst. de Fisica; Corbo, Rossana [Universidade Federal do Rio de Janeiro (FM/UFRJ), Rio de Janeiro, RJ (Brazil). Dept. de Radiologia

    2011-07-01

    The quality management in Nuclear Medicine Services is a requirement of national and international standards. The Brazilian regulatory agency in health surveillance, the Agencia Nacional de Vigilancia Sanitaria (ANVISA), in its Resolucao de Diretoria Colegiada (Collegiate Directory Resolution) no. 38, requires the elaboration of documents describing the technical and clinical routine activities. This study aimed to elaborate, implement and evaluate Standard Operating Procedures (SOPs) for quality control tests and radiological protection activities in the Nuclear Medicine Service of a university hospital. Eighteen SOPs were developed, involving tasks related to dose calibrator, gamma camera, Geiger-Muller detectors and radiological protection activities. The performance of its application was evaluated for a period of six months. It was observed a reduction in 75% of reported operational errors and 42% of the number of reported incidents with contamination by radioactive material. The SOPs were adequate and successful in its application. New procedures involving clinical activities will also be developed and evaluated. (author)

  13. Standard operation procedures for conducting the on-the-road driving test, and measurement of the standard deviation of lateral position (SDLP

    Directory of Open Access Journals (Sweden)

    Verster JC

    2011-05-01

    Full Text Available Joris C Verster¹, Thomas Roth²¹Utrecht Institute for Pharmaceutical Sciences, Division of Pharmacology, Utrecht University, Utrecht, The Netherlands; ²Sleep Disorders and Research Center, Henry Ford Health System, Detroit, MI, USAAbstract: This review discusses the methodology of the standardized on-the-road driving test and standard operation procedures to conduct the test and analyze the data. The on-the-road driving test has proven to be a sensitive and reliable method to examine driving ability after administration of central nervous system (CNS drugs. The test is performed on a public highway in normal traffic. Subjects are instructed to drive with a steady lateral position and constant speed. Its primary parameter, the standard deviation of lateral position (SDLP, ie, an index of 'weaving', is a stable measure of driving performance with high test–retest reliability. SDLP differences from placebo are dose-dependent, and do not depend on the subject's baseline driving skills (placebo SDLP. It is important that standard operation procedures are applied to conduct the test and analyze the data in order to allow comparisons between studies from different sites.Keywords: driving test, SDLP, methodology, on-the-road, highway

  14. RTOD-photo operations and procedures manual

    Energy Technology Data Exchange (ETDEWEB)

    1966-03-15

    This document presents a survey of the EG&G NRDS photographic operation in four major sections and includes the work scope, procedures, some technical backgrounding and operational information. Two sections, Instrumentation and Photo Systems, include the areas of direct responsibilities while a section on Film Handling and Coordination and a section covering special information, pertinent to the project, are included to adequately complete this survey. The photographic group is housed in two trailers within the control point area at NRDS and from these trailers provides photographic support at a number of locations. Four camera bunkers, three camera towers, a kinescope system, a microfilm system and remote camera controls comprise the facilities that the group maintains and operates outside these trailers. The work load includes major items such as: motion picture coverage of the nuclear rocket engine tests, data record microfilming, kinescope recording, and documentary coverage of the company related operational responsibilities. In addition, a number of minor photographic services are extended, when required. The nature of the work, because of its importance within the research and development efforts at NRDS, requires optimum quality and efficiency throughout. The many procedures outlined here have been designed to satisfy these requirements.

  15. Test Operations Procedure (TOP) 03-2-504A Safety Evaluation of Small Arms and Medium Caliber Weapons

    Science.gov (United States)

    2013-05-29

    These are usually limited to the parts involved in field strip and clean, but may include other weapon parts such as quick change barrels, etc...b. Common small arms may produce ammonia ( NH3 ), carbon dioxide (CO2), carbon monoxide (CO), hydrogen cyanide (HCN), nitric oxide (NO), nitrogen...MIL-STD Military Standard mm millimeters mph miles per hour NDT nondestructive test NH3 ammonia NO nitric oxide NO2 nitrogen dioxide

  16. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  17. Adolescent test or procedure preparation

    Science.gov (United States)

    ... for a medical test or procedure can reduce anxiety, encourage cooperation, and help your teen develop coping skills. ... to be there. Do not show your own anxiety. Looking anxious will make your adolescent more upset and worried. Research suggests that children ...

  18. Electronic Procedures for Medical Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Electronic procedures are currently being used to document the steps in performing medical operations for the Space Shuttle and/or the International Space Station...

  19. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  20. 40 CFR 60.4213 - What test methods and other procedures must I use if I am an owner or operator of a stationary CI...

    Science.gov (United States)

    2010-07-01

    ... must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of greater than or equal to 30 liters per cylinder? 60.4213 Section 60.4213 Protection of... Combustion Engines Testing Requirements for Owners and Operators § 60.4213 What test methods and other...

  1. 7 CFR 51.59 - Operations and operating procedures.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Operations and operating procedures. 51.59 Section 51.59 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL...

  2. DACS upgrade acceptance test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  3. Energy conservation aircraft design and operational procedures

    Energy Technology Data Exchange (ETDEWEB)

    Poisson-Quinton, P.

    1978-01-01

    The paper reviews studies associated with improved fuel efficiency. Several aircraft design concepts are described including: (1) increases in aerodynamic efficiency through decreased friction drag, parasitic drag, and drag due to lift, (2) structural efficiency and the implementation of composite materials, (3) active control technology, (4) the optimization of airframe-engine integration, and (5) VTOL and STOL concepts. Consideration is also given to operational procedures associated with flight management, terminal-area operations, and the influence of environmental noise constraints on fuel economy.

  4. 40 CFR 86.339-79 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...

  5. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  6. Environmental Sciences Division Toxicology Laboratory standard operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Stewart, A.J.; Wicker, L.F.; Logsdon, G.M.

    1989-09-01

    This document was developed to provide the personnel working in the Environmental Sciences Division's Toxicology Laboratory with documented methods for conducting toxicity tests. The document consists of two parts. The first part includes the standard operating procedures (SOPs) that are used by the laboratory in conducting toxicity tests. The second part includes reference procedures from the US Environmental Protection Agency document entitled Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Freshwater Organisms, upon which the Toxicology Laboratory's SOPs are based. Five of the SOPs include procedures for preparing Ceriodaphnia survival and reproduction test. These SOPs include procedures for preparing Ceriodaphnia food (SOP-3), maintaining Ceriodaphnia cultures (SOP-4), conducting the toxicity test (SOP-13), analyzing the test data (SOP-13), and conducting a Ceriodaphnia reference test (SOP-15). Five additional SOPs relate specifically to the fathead minnow (Pimephales promelas) larval survival and growth test: methods for preparing fathead minnow larvae food (SOP-5), maintaining fathead minnow cultures (SOP-6), conducting the toxicity test (SOP-9), analyzing the test data (SOP-12), and conducting a fathead minnow reference test (DOP-14). The six remaining SOPs describe methods that are used with either or both tests: preparation of control/dilution water (SOP-1), washing of glassware (SOP-2), collection and handling of samples (SOP-7), preparation of samples (SOP-8), performance of chemical analyses (SOP-11), and data logging and care of technical notebooks (SOP-16).

  7. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...

  8. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  9. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  10. SSC Test Operations Contract Overview

    Science.gov (United States)

    Kleim, Kerry D.

    2010-01-01

    This slide presentation reviews the Test Operations Contract at the Stennis Space Center (SSC). There are views of the test stands layouts, and closer views of the test stands. There are descriptions of the test stand capabilities, some of the other test complexes, the Cryogenic propellant storage facility, the High Pressure Industrial Water (HPIW) facility, and Fluid Component Processing Facility (FCPF).

  11. EMP Preferred Test Procedures. Revision

    Science.gov (United States)

    1977-02-01

    CoMputer halt in,,! only when Z11) upset Condi0 tion is detected. The test may. then be repe’jt ed at th e upset lwv I on i s ingle shot has is and he...References W. E. Boettcher, et al., lcctromagnetic Pulse Handbook for Missiles and Aircraft in flight, (Albuquerque, New Mexico : Sandia Laboratories

  12. 42 CFR 35.15 - Consent to operative procedures.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Consent to operative procedures. 35.15 Section 35... EXAMINATIONS HOSPITAL AND STATION MANAGEMENT General § 35.15 Consent to operative procedures. Except in... operative procedure shall be undertaken unless the patient or, in the case of a minor or incompetent, his...

  13. 21 CFR 120.6 - Sanitation standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Sanitation standard operating procedures. 120.6... Provisions § 120.6 Sanitation standard operating procedures. (a) Sanitation controls. Each processor shall have and implement a sanitation standard operating procedure (SSOP) that addresses sanitation...

  14. Test Procedure - pumping system for caustic addition project

    Energy Technology Data Exchange (ETDEWEB)

    Leshikar, G.A.

    1994-10-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  15. Operational Test Instrumentation Guide.

    Science.gov (United States)

    1981-11-01

    506U 2 IRIG time code generator Systron Donner model 8526 2 Camera, video Edo Western model 1411 6 Time date generators lET model VTG 302 10 Time date...used in tests. They are capable of manual or automatic acquisition and tracking of targets in flight or orbit by target echo or beacon. Range is from...4500 visible Camera, mini 4 projects as " Edo Western 1800 Recorder/Repro- required 3 ducer 12 Sony V03800/2000/2860 monitor 10 9/14/17" Conrac SNA/RQB

  16. Electronic Procedures for Medical Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose an alternative to using Microsoft Word for representing medical procedures that will make the procedures easier to construct and maintain, particularly...

  17. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  18. A simulation facility for testing Space Station assembly procedures

    Science.gov (United States)

    Hajare, Ankur R.; Wick, Daniel T.; Shehad, Nagy M.

    1994-11-01

    NASA plans to construct the Space Station Freedom (SSF) in one of the most hazardous environments known to mankind - space. It is of the utmost importance that the procedures to assemble and operate the SSF in orbit are both safe and effective. This paper describes a facility designed to test the integration of the telerobotic systems and to test assembly procedures using a real-world robotic arm grappling space hardware in a simulated microgravity environment.

  19. Treatment of ruptured Achilles tendon: Operative or non-operative procedure?

    Science.gov (United States)

    Cukelj, Fabijan; Bandalovic, Ante; Knezevic, Josip; Pavic, Arsen; Pivalica, Bozen; Bakota, Bore

    2015-11-01

    The aim of this study was to compare the efficiency of non-operative and surgical procedures in the treatment of ruptured Achilles tendon in athletes (professional and amateur). Ninety professional or amateur athletes with rupture of the Achilles tendon were included in the study between 1998 and 2013. The athletes were aged between 25 and 40 years (mean 34.83±4.65). A total of 30 athletes underwent an open procedure, 30 were treated with a percutaneous method and 30 were treated non-operatively. All operated patients were tested one year after the surgical procedure. An isokinetic dynamometer was used to compare the open and percutaneous methods. The results for the patients who were treated using the percutaneous method were 15% better than those for the patients who underwent the open procedure; the results for the group treated conservatively were 20% better than those for the group treated percutaneously. The percutaneous method was easier technically than the open method. Time spent in hospital was 14.5 times shorter with the percutaneous procedure compared with the open procedure (percutaneous procedure: range 0.5-2 days, mean 0.79±0.36; open procedure: range 10-24 days, mean 11.46±2.70; pAchilles tendon in the group treated with the percutaneous procedure. One patient in the group treated with the open procedure had postoperative infection (4.2%). In the non-surgical (conservatively treated) group, there were three reruptures of the Achilles tendon within one year, and one patient developed adhesions that resulted in loss of function and had to undergo an operation. The percutaneous method is the best method of surgical treatment for Achilles tendon rupture. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  1. An operational procedure for rapid flood risk assessment in Europe

    Science.gov (United States)

    Dottori, Francesco; Kalas, Milan; Salamon, Peter; Bianchi, Alessandra; Alfieri, Lorenzo; Feyen, Luc

    2017-07-01

    The development of methods for rapid flood mapping and risk assessment is a key step to increase the usefulness of flood early warning systems and is crucial for effective emergency response and flood impact mitigation. Currently, flood early warning systems rarely include real-time components to assess potential impacts generated by forecasted flood events. To overcome this limitation, this study describes the benchmarking of an operational procedure for rapid flood risk assessment based on predictions issued by the European Flood Awareness System (EFAS). Daily streamflow forecasts produced for major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in terms of flood-prone areas, economic damage and affected population, infrastructures and cities.An extensive testing of the operational procedure has been carried out by analysing the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-based and report-based flood extent data, while modelled estimates of economic damage and affected population are compared against ground-based estimations. Finally, we evaluate the skill of risk estimates derived from EFAS flood forecasts with different lead times and combinations of probabilistic forecasts. Results highlight the potential of the real-time operational procedure in helping emergency response and management.

  2. YF-16 flight flutter test procedures

    Science.gov (United States)

    Brignac, W. J.; Ness, H. B.; Johnson, M. K.; Smith, L. M.

    1976-01-01

    The Random Decrement technique (Randomdec) was incorporated in procedures for flight testing of the YF-16 lightweight fighter prototype. Damping values obtained substantiate the adequacy of the flutter margin of safety. To confirm the structural modes which were being excited, a spectral analysis of each channel was performed using the AFFTC time/data 1923/50 time series analyzer. Inflight test procedure included the careful monitoring of strip charts, three axis pulses, rolls, and pullups.

  3. 40 CFR 243.202-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommended procedures: Operations... SOLID WASTE Requirements and Recommended Procedures § 243.202-3 Recommended procedures: Operations. (a... wipers, taillights, backup lights, audible reverse warning devices, tires, and hydraulic systems. Any...

  4. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    Energy Technology Data Exchange (ETDEWEB)

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  5. Operability test report for the in SITU vapor sampling

    Energy Technology Data Exchange (ETDEWEB)

    Corbett, J.E., Westinghouse Hanford

    1996-05-31

    This report documents the successful completion of testing for the In Situ Vapor Sampling (ISVS) system. The report includes the test procedure (WHC-SD-WM-OTP-196, Rev OA), data sheets, exception resolutions, and a test report summary. This report conforms to the guidelines established in WHC-IP-1026, `Engineering Practice Guidelines,` Appendix L, `Operability Test Procedures and Reports.`

  6. 78 FR 54510 - New Entrant Safety Assurance Program Operational Test

    Science.gov (United States)

    2013-09-04

    ... TRANSPORTATION Federal Motor Carrier Safety Administration New Entrant Safety Assurance Program Operational Test... Motor Carrier Safety Administration (FMCSA) announces an operational test of procedural changes to the New Entrant Safety Assurance Program. The operational test began in July 2013 and will be in effect...

  7. Radiation dose to the operator during fluoroscopically guided spine procedures

    Energy Technology Data Exchange (ETDEWEB)

    Roccatagliata, Luca; Pravata, Emanuele; Cianfoni, Alessandro [Department of Neuroradiology, Neurocenter of Southern Switzerland, Ospedale Regionale di Lugano, Lugano (Switzerland); Presilla, Stefano [Unita di Fisica Medica, Ente Ospedaliero Cantonale (EOC), Bellinzona (Switzerland)

    2017-09-15

    Fluoroscopy is widely used to guide diagnostic and therapeutic spine procedures. The purpose of this study was to quantify radiation incident on the operator (operator Air Kerma) during a wide range of fluoroscopy-guided spine procedures and its correlation with the amount of radiation incident on the patient (Kerma Area Product - KAP). We retrospectively included 57 consecutive fluoroscopically guided spine procedures. KAP [Gy cm{sup 2}] and total fluoroscopy time were recorded for each procedure. An electronic dosimeter recorded the operator Air Kerma [μGy] for each procedure. Operator Air Kerma for each procedure, correlation between KAP and operator Air Kerma, and between KAP and fluoroscopy time was obtained. Operator Air Kerma was widely variable across procedures, with median value of 6.4 μGy per procedure. Median fluoroscopy time and median KAP per procedure were 2.6 min and 4.7 Gy cm{sup 2}, respectively. There was correlation between operator Air Kerma and KAP (r{sup 2} = 0.60), with a slope of 1.6 μGy Air Kerma per unit Gy cm{sup 2} KAP incident on the patient and between fluoroscopy time and KAP (r{sup 2} = 0.63). Operator Air Kerma during individual fluoroscopy-guided spine procedures can be approximated from the commonly and readily available information of the total amount of radiation incident on the patient, measured as KAP. (orig.)

  8. Redo autograft operations after the Ross procedure.

    Science.gov (United States)

    Brinkman, William T; Herbert, Morley A; Prince, Syma L; Ryan, Connor; Ryan, William H

    2012-05-01

    Autograft dilatation after the Ross procedure is the most common cause of late autograft failure. We looked at results after reoperation for autograft dysfunction using autograft sparing and composite root replacement techniques. Data were abstracted from our prospectively collected Ross registry for 160 consecutive patients who underwent a Ross procedure by a single surgeon between 1994 and 2008. Follow-up records were obtained, and the last echocardiographic report after reoperation was analyzed. Autograft reoperation was necessary in 17 patients, at a median interval of 6.9 years after the original procedure. Indications for reoperation were insufficiency with autograft dilatation in 16 patients, and without dilatation in 1 patient. Surgical procedures used at reoperation included autograft reimplantation in 6 patients (35.3%), autograft remodeling procedure in 1 patient (5.9%), composite root replacement with mechanical valved conduit in 5 patients (29.4%), composite root replacement with biologic valved conduit in 3 patients (17.6%), and mechanical aortic valve replacement in 2 patients (11.8%). At a median follow-up of 5.0 years after reoperation, freedom from greater than 2+ aortic insufficiency was 100% (17 of 17 patients) in both reimplantation and replacement groups. There was 1 death after reoperation (at >14 years) related to complications from systemic lupus erythematosus. There have been no strokes after autograft reimplantation. Autograft valve reimplantation and composite aortic root replacement are effective treatments for aortic root dilatation and aortic insufficiency after the Ross procedure. Echocardiographic follow-up demonstrates reasonable short-term function after autograft preservation procedures. Copyright © 2012 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  9. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland. Focused Feasibility Study, Final Quality Assurance Project Plan, Standard Operating Procedures (SOPs). Appendix A

    Science.gov (United States)

    1993-10-01

    3.3 Enclose each sample in a clear zip-seal plastic bag. 3.4 Place several layers of bubble wrap, or at least 1" of vermiculite on the bottom of the...liners f. 5% NaOH g. 5% Ultrex HNO 3 h. Deionized water i. Alconox detergent j. Hexane (Nanograde or equivalent) k. Acetone 1. Methelyne Chloride 3.0...Procedures 3.1 Polyethylene bottles 3.1.1 Rinse bottles and lids sequentially with 5 % NaOH , with deionized water, with 5% Ultrex nitric acid, and

  10. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  11. Assessment of the Operational Procedure of the Traditional Credit ...

    African Journals Online (AJOL)

    This study examined the operational procedure of the traditional credit and savings associations in Imo State. It is aimed at identifying the associations whose operational procedure and organizational structure make linkage with the formal credit market possible without the associations losing their distinctive relevance to ...

  12. An operational procedure for rapid flood risk assessment in Europe

    Directory of Open Access Journals (Sweden)

    F. Dottori

    2017-07-01

    Full Text Available The development of methods for rapid flood mapping and risk assessment is a key step to increase the usefulness of flood early warning systems and is crucial for effective emergency response and flood impact mitigation. Currently, flood early warning systems rarely include real-time components to assess potential impacts generated by forecasted flood events. To overcome this limitation, this study describes the benchmarking of an operational procedure for rapid flood risk assessment based on predictions issued by the European Flood Awareness System (EFAS. Daily streamflow forecasts produced for major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in terms of flood-prone areas, economic damage and affected population, infrastructures and cities.An extensive testing of the operational procedure has been carried out by analysing the catastrophic floods of May 2014 in Bosnia–Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-based and report-based flood extent data, while modelled estimates of economic damage and affected population are compared against ground-based estimations. Finally, we evaluate the skill of risk estimates derived from EFAS flood forecasts with different lead times and combinations of probabilistic forecasts. Results highlight the potential of the real-time operational procedure in helping emergency response and management.

  13. 76 FR 25211 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2011-05-04

    ... Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts AGENCY: Office of Energy... Energy (DOE) issues a final rule amending the existing test procedures for fluorescent lamp ballasts at... operation. The test procedure specifies use of a fluorescent lamp load during testing, allowing ballasts to...

  14. 10 CFR 431.242 - Test Procedures [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test Procedures 431.242 Section 431.242 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance...

  15. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests...

  16. 40 CFR 792.81 - Standard operating procedures.

    Science.gov (United States)

    2010-07-01

    ... CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.81 Standard...) Test system room preparation. (2) Test system care. (3) Receipt, identification, storage, handling...

  17. Incidents that require emergency operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Brinn, M.S.; Menegus, R.L.; Neill, J.S.; Ring, H.F.

    1953-11-27

    All foreseeable emergencies are adequately forestalled by installing in the reactor areas of the Savannah River Plant a number of pieces of auxiliary equipment. This precaution is taken in order to prevent permanent damage to the main equipment and to contain the radioactive material in the restricted areas of the plant. However, in the unlikely event of failure of some pieces of the main and/or auxiliary equipment, it is necessary that the operators take coordinated emergency action in order to prevent damage and hazard. In some cases swift action is called for. Because there are many pieces of equipment, all of which can conceivably be said to be subject to failure or faulty operation, one could postulate an astronomical number of failure incidents, each one different. But many of these would be highly improbable or call for the same emergency action. On the master incident sheet, Table 1, there are defined twenty such incidents, which represent a fair cross section of the possibilities. In compiling this table, the authors have kept in mind all of the worst reactor accidents that have occurred in the US and Canada and those minor equipment failures that have occurred at SRP before the startup of the reactors. In addition, there are one or two in the table that are almost impossible to conceive in any reasonable frame of probability; these represent limiting cases insofar as hazard is concerned. The consequences of the incidents mentioned in Table 1 are the results to be expected if the unaffected equipment functions properly, but the operators take no emergency action. For those cases in which damage is to be expected, emergency action by the operators can greatly reduce or eliminate entirely the damage and spread of radioactivity. As a means of showing what actions are necessary and how rapidly they must be accomplished, the twenty incidents considered in this report are analyzed in more detail on the sheets labeled INCIDENT No.

  18. Selection of Operative Procedures for Cubital Tunnel Syndrome

    Science.gov (United States)

    Novak, Christine B.

    2008-01-01

    The purpose of this study was to investigate the primary operative procedures that are performed by hand surgeons for cubital tunnel syndrome and their reported satisfaction with these procedures. The survey consisted of 22 questions regarding primary operative treatment of cubital tunnel syndrome and demographics and was sent by email to the 459 active members of the American Association for Hand Surgery. One hundred sixty-four surgeons completed the survey (36% response rate). The total sample included 154 hand surgeons (143 males, 11 females) who operated on cubital tunnel syndrome and the majority of surgeons were in private practice (n = 100) followed by academic practice (n = 50). The most prevalent factors that influence the decision to operate include evidence of muscle atrophy (84%), abnormal nerve conduction studies (51%), and failed non-operative treatment (49%). Most surgeons (n = 133) reported using more than one operative procedure for their patients with cubital tunnel syndrome. Factors that influenced the operative procedure selected included the degree of nerve compression (60%), medical comorbidities (30%), patient’s occupation (28%), and obesity (22%). Following carpal tunnel surgery, 88% of the surgeons were “very satisfied” with their patient outcome and following surgery for cubital tunnel syndrome, only 44% were “very satisfied” with their patient outcome. Most surgeons use more than one operative procedure in their treatment of patients with cubital tunnel syndrome and the selection of the operative procedure is influenced by patient factors and surgeon preference. PMID:18807093

  19. Operational test report for 2706-T complex liquid transfer system

    Energy Technology Data Exchange (ETDEWEB)

    BENZEL, H.R.

    1999-09-01

    This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system.

  20. 9 CFR 590.504 - General operating procedures.

    Science.gov (United States)

    2010-01-01

    ..., stabilizing, or drying operations shall start as soon as practicable after breaking to prevent deterioration...) Utensils and equipment, except drying units, powder conveyors, sifters, blenders, and mechanical powder..., Processing, and Facility Requirements § 590.504 General operating procedures. (a) Operations involving...

  1. Braking, Wheeled Vehicles. Test Operations Procedure (TOP)

    National Research Council Canada - National Science Library

    2008-01-01

    .... Major factors to be considered in the evaluation of vehicle braking systems are stopping and grade holding ability, vehicle stability and control during brake applications, and individual braking...

  2. The Nonlethal Information Operations Targeting Process: Duties, Responsibilities and Procedures

    National Research Council Canada - National Science Library

    Gallogly, Erin

    1998-01-01

    .... This monograph's purpose is twofold. First, it provides the Joint Task Force Commander procedures by which to integrate nonlethal information operations into the joint targeting process and recommends duties and responsibilities...

  3. Standard Operating Procedures, MCSP Monarch and Plant Monitoring, 2016

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This record contains the six Standard Operating Procedure (SOP) of the initial survey instructions (ISI) developed and followed for surveys conducted as part of the...

  4. Intra-operative removal of chest tube in video-assisted thoracoscopic procedures

    Directory of Open Access Journals (Sweden)

    Moustafa M. El-Badry

    2017-12-01

    Conclusions: Intra-operative removal of chest tube during VATS procedures was a safe technique in well selected patients with an intra-operative successful air-leak test with radiological and clinical follow-up. This technique provided lesser post-operative pain with shorter hospital stay.

  5. Radiation exposure of operator during various interventional procedures

    Energy Technology Data Exchange (ETDEWEB)

    Yu, In Kyu; Chung, Jin Wook; Han, Joon Koo; Park, Jae Hyung; Kang, Wee Saing [Seoul National University College of Medicine, Seoul (Korea, Republic of)

    1994-02-15

    To investigate the levels of radiation exposure of an operator which may be influenced by the wearing an apron, type of procedure, duration of fluoroscopy and operator's skill during various interventional procedures. Radiation doses were measured both inside and outside the apron(0.5 mm lead equivalent) of the operator by a film badge monitoring method and the duration of fluoroscopy was measured in 96 procedures prospectively. The procedures were 30 transcatheter arterial embolization (TAE), 25 percutaneous transhepatic biliary drainages (PTBD), 16 stone removals (SR), 15 percutaneous needle aspirations (PNCA) and 10 percutaneous nephrostomies(PCN). To assess the difference of exposure by the operator's skill, the procedures of TAE and PTBD were done separately by groups of staffs and residents. Average protective effect of the apron was 72.8%. Average radiation exposure(unit: {mu} Sv/procedure was 23.3 in PTBD by residents, 10.0 in PTBD by staffs, 10.0 in SR, 8.7 in TAE by residents, 7.3 in TAE by staffs, 9.0 in PCN and 6.0 in PCNA. Average radiation exposure of residents were 1.9 times greater than those of staffs. Radiation exposure was not proportionally related to the duration of fluoroscopy, but influenced by wearing an apron, various types of procedure and operator's skills.

  6. Regional Test Center Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burnham, Laurie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Christian Birk [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlines tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.

  7. A unified framework for weighted parametric multiple test procedures.

    Science.gov (United States)

    Xi, Dong; Glimm, Ekkehard; Maurer, Willi; Bretz, Frank

    2017-09-01

    We describe a general framework for weighted parametric multiple test procedures based on the closure principle. We utilize general weighting strategies that can reflect complex study objectives and include many procedures in the literature as special cases. The proposed weighted parametric tests bridge the gap between rejection rules using either adjusted significance levels or adjusted p-values. This connection is made by allowing intersection hypotheses of the underlying closed test procedure to be tested at level smaller than α. This may be also necessary to take certain study situations into account. For such cases we introduce a subclass of exact α-level parametric tests that satisfy the consonance property. When the correlation is known only for certain subsets of the test statistics, a new procedure is proposed to fully utilize this knowledge within each subset. We illustrate the proposed weighted parametric tests using a clinical trial example and conduct a simulation study to investigate its operating characteristics. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  8. Test procedures for MPPT charge controllers characterization

    Energy Technology Data Exchange (ETDEWEB)

    Camino-Villacorta, M.; Egido-Aguilera, M.A. [Universidad Politecnica de Madrid (Spain). Inst. de Energia Solar

    2010-07-01

    International quality standards for PV systems do not cover all the relevant aspects for PVSAS. This is the case of battery charge controllers which still do not have a standard of performance and testing: the future IEC 62509 is in voting phase at the moment, but it does not include specific features of MPPT controllers. There is not yet an international consensus about which are the specific performance parameters in order to standardize these equipments. This work, still in progress, is focused in the specific parameters for MPPT charge controllers. A definition of parameters is presented in this article including the results of outdoor measurements along one year. The results have been verified indoor using a PV simulator. The experimental tests applied are based in the standard draft. The aim of this work is to contribute to the definition of efficiency, performance parameters and test procedures for the characterization of charge controllers including Maximum Power Point Tracking (MPPT). (orig.)

  9. Some Remarks on Foundation Pile Testing Procedures

    Science.gov (United States)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  10. 100 Area soil washing bench-scale test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  11. 75 FR 71570 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-11-24

    ... Part 430 RIN 1904-AB99 Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts... procedures for fluorescent lamp ballasts established under the Energy Policy and Conservation Act. The... BLE test procedure would measure the performance of a ballast while operating a fluorescent lamp...

  12. Operative findings in recurrent hernia after a Lichtenstein procedure

    DEFF Research Database (Denmark)

    Bay-Nielsen, M; Nordin, P; Nilsson, E

    2001-01-01

    at the pubic tubercle. METHODS: A review was made of 87 records from operations for recurrence after a previous Lichtenstein procedure, based upon national and large area data bases, recording 95% (Denmark) and 50% (Sweden) of all inguinal hernia operations. RESULTS: Direct recurrences were found in 62...... of the recurrences after the Lichtenstein repair may be obtained by increased attention to this specific technical aspect of the operation....

  13. Measurement on Tinetti test: instrumentation and procedures.

    Science.gov (United States)

    Lombardi, R; Buizza, A; Gandolfi, R; Vignarelli, C; Guaita, A; Panella, L

    2001-01-01

    A measurement system and associate signal processing procedures for quantifying subject's performance during the performance-oriented assessment of balance as defined in Tinetti test (TT) is described. It is based on two inclinometers measuring trunk inclination in two orthogonal planes. Signals from the transducers are acquired by a PC through A/DC board. Signal processing consists in computing morphological parameters describing the main features of subject movement during the different TT maneuvers. The system is simple, cheap, user friendly, causes no discomfort to the patient and can easily be modified to comply with either new requirements or the needs of other performance tests dealing with trunk movement. Preliminary results of measurements on both normals and patients suggest the viability of this approach and the possibility of discriminating normal from abnormal performance, based on the values of the morphological parameters.

  14. 14 CFR 33.89 - Operation test.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation test. 33.89 Section 33.89... STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.89 Operation test. (a) The operation test must include testing found necessary by the Administrator to demonstrate— (1) Starting, idling...

  15. 14 CFR 33.51 - Operation test.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation test. 33.51 Section 33.51... STANDARDS: AIRCRAFT ENGINES Block Tests; Reciprocating Aircraft Engines § 33.51 Operation test. The operation test must include the testing found necessary by the Administrator to demonstrate backfire...

  16. 40 CFR 90.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 90.408 Section 90... Procedures § 90.408 Pre-test procedures. (a) Engine service accumulation and stabilization procedure. Use the... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test preparation...

  17. Temperature buffer test. Dismantling operation

    Energy Technology Data Exchange (ETDEWEB)

    Aakesson, Mattias [Clay Technology AB, Lund (Sweden)

    2010-12-15

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modelling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aespoe HRL. It was installed during the spring of 2003. Two heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by bentonite in the usual way, whereas the upper heater was surrounded by a ring of sand. The test was dismantled and sampled during a period from the end of October 2009 to the end of April 2010, and this report describes this operation. Different types of samples have been obtained during this operation. A large number of diameter 50 mm bentonite cores have been taken for analysis of water content and density. Large pieces, so-called big sectors, have been taken for hydro-mechanical and chemical characterizations. Finally, there has been an interest to obtain different types of interface samples in which bentonite were in contact with sand, iron or concrete. One goal has been to investigate the retrievability of the upper heater, given the possibility to remove the surrounding sand shield, and a retrieval test has therefore been performed. The sand in the shield was first removed with an industrial vacuum cleaner after loosening the material through mechanical means (with hammer drill and core machine). A front loader was subsequently used for applying a sufficient lifting force to release the heater from the bentonite underneath. The experiment has been documented in different aspects: measurements of the coordinate (height or radius) of different interfaces (between bentonite blocks and between bentonite and sand); verification of sensor positions and retrieval of sensors for subsequent

  18. Test plan/procedure for the checkout of the USA cable communications test configuration for the electromagnetic compatibility (EMC) tests

    Science.gov (United States)

    Perry, J. C.

    1975-01-01

    A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.

  19. Environmental Quality Information Analysis Center (EQIAC) operating procedures handbook

    Energy Technology Data Exchange (ETDEWEB)

    Walsh, T.E. (Florida Univ., Gainesville, FL (United States)); Das, S. (Oak Ridge National Lab., TN (United States))

    1992-08-01

    The Operating Procedures Handbook of the Environmental Quality Information Analysis Center (EQIAC) is intended to be kept current as EQIAC develops and evolves. Its purpose is to provide a comprehensive guide to the mission, infrastructure, functions, and operational procedures of EQIAC. The handbook is a training tool for new personnel and a reference manual for existing personnel. The handbook will be distributed throughout EQIAC and maintained in binders containing current dated editions of the individual sections. The handbook will be revised at least annually to reflect the current structure and operational procedures of EQIAC. The EQIAC provides information on environmental issues such as compliance, restoration, and environmental monitoring do the Air Force and DOD contractors.

  20. Toward standardization of EAP actuators test procedures

    Science.gov (United States)

    Fernandez, Diego; Moreno, Luis; Baselga, Juan

    2005-05-01

    Since the field of Electroactive Polymers (EAP) actuators is fairly new there are no standard testing processes for such intelligent materials. This drawback can seriously limit the scope of application of EAP actuators, since the targeted industrial sectors (aerospace, biomedical...) demand high reliability and product assurance. As a first iteration two elements are required to define a test standard for an EAP actuator: a Unit Tester, and a Component Specification. In this paper a EAP Unit Tester architecture is presented along with the required classification of measurements to be included in the EAP actuator Component Specification. The proposed EAP Unit Tester allows on-line monitoring and recording of the following properties of the specimen under test: large deformation, small tip displacement, temperature at the electrodes, weight of the specimen, voltage and current driven into the EAP, load being applied to the actuator, output voltage of the EAP in sensing operation and mode of operation (structure/sensor/actuator/smart). The measurements are taken simultaneously, in real-time. The EAP Unit Tester includes a friendly Graphical User Interface. It uses embedded Excel tools to visualize data. In addition, real-time connectivity with MATLAB allows an easy testing of control algorithms. A novel methodology to measure the properties of EAP specimens versus a variable load is also presented. To this purpose a force signals generator in the range of mN was developed. The device is based on a DC mini-motor. It generates an opposing force to the movement of the EAP actuator. Since the device constantly opposes the EAP actuator movement it has been named Digital Force Generator (DFG). The DFG design allows simultaneous length and velocity measuring versus different load signals. By including such a device in the EAP Unit Tester the most suitable application for the specimen under test can be easily identified (vibration damper, large deformation actuator, large

  1. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  2. Aerosol can puncture device operational test plan

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.J.

    1994-05-03

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system`s fire/explosion proof characteristics, a study was undertaken to compare the baseline system`s design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv.

  3. IMPACT ON CONTRIBUTIONS FUMES FROM WELDING PROCEDURES WELDER HEALTH OPERATORS

    Directory of Open Access Journals (Sweden)

    Gheorghe AMZA

    2012-05-01

    Full Text Available This paper presents a series of investigations undertaken to establish the impact of gas welding results in fusion welding procedures and welders health operators who work in departments making welded construction. Are the main gases that occur in fusion welding and main effects of short-term and long on the human body.

  4. 7 CFR 205.662 - Noncompliance procedure for certified operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Noncompliance procedure for certified operations. 205.662 Section 205.662 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS...

  5. 40 CFR 240.210-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... prominently posted. (g) Equipment manuals, catalogs, spare parts lists, and spare parts should be readily... made for instruction of the staff in proper operation and maintenance procedures. (d) A routine maintenance schedule should be established and followed. (e) As-built engineering drawings of the facility...

  6. Software testing concepts and operations

    CERN Document Server

    Mili, Ali

    2015-01-01

    Explores and identifies the main issues, concepts, principles and evolution of software testing, including software quality engineering and testing concepts, test data generation, test deployment analysis, and software test managementThis book examines the principles, concepts, and processes that are fundamental to the software testing function. This book is divided into five broad parts. Part I introduces software testing in the broader context of software engineering and explores the qualities that testing aims to achieve or ascertain, as well as the lifecycle of software testing. Part II c

  7. Simplified Expert Elicitation Procedure for Risk Assessment of Operating Events

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; David Gertman; Jeffrey Joe; Julie Marble; William Galyean; Larry Blackwood; Harold Blackman

    2005-06-01

    This report describes a simplified, tractable, and usable procedure within the US Nuclear Regulator Commission (NRC) for seeking expert opinion and judgment. The NRC has increased efforts to document the reliability and risk of nuclear power plants (NPPs) through Probabilistic Risk Assessment (PRA) and Human Reliability Analysis (HRA) models. The Significance Determination Process (SDP) and Accident Sequence Precursor (ASP) programs at the NRC utilize expert judgment on the probability of failure, human error, and the operability of equipment in cases where otherwise insufficient operational data exist to make meaningful estimates. In the past, the SDP and ASP programs informally sought the opinion of experts inside and outside the NRC. This document represents a formal, documented procedure to take the place of informal expert elicitation. The procedures outlined in this report follow existing formal expert elicitation methodologies, but are streamlined as appropriate to the degree of accuracy required and the schedule for producing SDP and ASP analyses.

  8. 40 CFR 401.13 - Test procedures for measurement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant amounts...

  9. 40 CFR 87.62 - Test procedure (propulsion engines).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure (propulsion engines... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 87.62 Test procedure (propulsion...

  10. Operating room waste: disposable supply utilization in neurointerventional procedures.

    Science.gov (United States)

    Rigante, Luigi; Moudrous, Walid; de Vries, Joost; Grotenhuis, André J; Boogaarts, Hieronymus D

    2017-12-01

    Operating rooms account for 70% of hospital waste, increasing healthcare costs and creating environmental hazards. Endovascular treatment of cerebrovascular pathologies has become prominent, and associated products highly impact the total cost of care. We investigated the costs of endovascular surgical waste at our institution. Data from 53 consecutive endovascular procedures at the Radboud UMC Nijmegen from May to December 2016 were collected. "Unused disposable supply" was defined as one-time use items opened but not used during the procedure. Two observers cataloged the unused disposable supply for each case. The cost of each item was determined from the center supply catalog, and these costs were summed to determine the total cost of unused supply per case. Thirteen diagnostic cerebral digital subtraction angiographies (DSA) (24.5%) and 40 endovascular procedures (75.5%) were analyzed. Total interventional waste was 27,299.53 € (mean 515.09 € per procedure). While total costs of unused disposable supply were almost irrelevant for DSAs, they were consistent for interventional procedures (mean 676.49 € per case). Aneurysm standard coiling had the highest impact on total interventional waste (mean 1061.55 €). Disposable interventional products had a very high impact on the surgical waste costs in the series of the neurointerventional procedures (95% of total waste). This study shows the impact of neurointerventional waste on the total care costs for cerebrovascular patients. This might reflect the tendency to anticipate needs and emergencies in neurointervention. Responsible use of disposable material can be achieved by educating operators and nurses and creating operator preference cards.

  11. Germ cell transplantation into mouse testes procedure.

    Science.gov (United States)

    Medrano, Jose V; Martínez-Arroyo, Ana M; Sukhwani, Meena; Noguera, Inmaculada; Quiñonero, Alicia; Martínez-Jabaloyas, Jose M; Pellicer, Antonio; Remohí, Jose; Orwig, Kyle E; Simón, Carlos

    2014-10-01

    To illustrate the step-by-step protocol followed to assay germ cell transplantation into the seminiferous epithelium of mouse testes. Video presentation of an animal model for research in reproductive and regenerative medicine. Research laboratory. Male nude mice (NU-Foxn1(nu)). Mice were chemically sterilized with alkylant compounds (busulfan) followed by gonadal microsurgery to inject donor germ cells. Donor cells should be labeled with reporter genes, such as green fluorescent protein (GFP), lactose operon (LacZ), or alternatively design an effective strategy with specific antibodies to track them within the recipient testes. Sperm detection in the ejaculate can also be used as a read out. However, in this case detection of the donor genotype in the sperm is mandatory to elucidate their origin. In the present study we describe the complete protocol for germ cell transplant by efferent duct injection, including the preparation of recipient mice, surgery for the germ cell transplant, and analysis of recipient testes. The main strength of this technique is that it constitutes the gold standard for a functional test of the germ cell potential as only spermatogonial stem cells are able to properly colonize the seminal lumen. Both fresh and frozen/thawed testicular cells are suitable for this technique as donor germ cells. Also, enrichment of living spermatogonial stem cells, previous to the transplant, seems to improve the efficiency of colonization. For proper colonization of germ cells, the niche should be available and thus mouse strains that lack endogenous spermatogenesis such as W/W(v) mutant mice are usually used. In the case of nonmatched donor cells, seminiferous epithelium of immune-suppressed recipient mice should be germ cell depleted before the transplant. One limitation of this technique is that the procedure can take up to 3 months. Also, in contrast to the full recovery of spermatogenesis in mouse-to-mouse transplants, xenotransplantation of germ

  12. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  13. 21 CFR 606.100 - Standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... units. (9) Procedures for investigating adverse donor and recipient reactions. (10) Storage temperatures...: (1) Criteria used to determine donor suitability, including acceptable medical history criteria. (2) Methods of performing donor qualifying tests and measurements, including minimum and maximum values for a...

  14. Director, Operational Test and Evaluation

    Science.gov (United States)

    2007-12-01

    The T-6 AUP avionics upgrades are being developed by the manufacturer, Hawker Beechcraft Corporation , as a company-funded, independent research and...opportunities are Tomahawk missile operations during the Greyhound Express series of exercises. Greyhound Express 07-1 (June 2007) served as a...R A M data collection, storage, and manipulation activities. Greyhound Express 08-1, tentatively scheduled for fall 2007, will be the primary data

  15. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15... (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The... Test Code 4.2 (1991), “Test Code for Coal Pulverizers” or ISO 9931 (1991), “Coal—Sampling of Pulverized...

  16. An approach to operating system testing

    Science.gov (United States)

    Sum, R. N., Jr.; Campbell, R. H.; Kubitz, W. J.

    1984-01-01

    To ensure the reliability and performance of a new system, it must be verified or validated in some manner. Currently, testing is the only resonable technique available for doing this. Part of this testing process is the high level system test. System testing is considered with respect to operating systems and in particular UNIX. This consideration results in the development and presentation of a good method for performing the system test. The method includes derivations from the system specifications and ideas for management of the system testing project. Results of applying the method to the IBM System/9000 XENIX operating system test and the development of a UNIX test suite are presented.

  17. School age test or procedure preparation

    Science.gov (United States)

    ... qualitative study of the pre-operative preparation of children, young people and their parents' for planned continence surgery: experiences and expectations. J Clin Nurs . 2012;21(13-14):1964- ...

  18. 16 CFR 1610.6 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... dimension of the specimen and arranged so the test flame impinges on a metallic thread. (iv) Embroidery... specimens cut so that the test flame impinges on the embroidered area. Test the most flammable area... located under the hood (or other suitable enclosure) with the fan turned off. Open the control valve in...

  19. 47 CFR 87.197 - ELT test procedures.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  20. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.144...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax (upper torso) assembly (refer to § 572.140(a)(1)(iv)). The thorax consists of the upper part of the torso...

  1. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.164... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a) Thorax (upper torso) assembly. The thorax consists of the part of the torso assembly shown in drawing 167...

  2. 49 CFR 572.124 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.124...-year-old Child Test Dummy, Beta Version § 572.124 Thorax assembly and test procedure. (a) Thorax (upper torso) assembly. The thorax consists of the part of the torso assembly shown in drawing 127-2000. (b...

  3. 49 CFR 572.134 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.134... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.134 Thorax assembly and test procedure. (a) Thorax (Upper Torso) Assembly (refer to § 572.130(a)(1)(iii)). The thorax consists of the part of...

  4. Review of the IEEE Standard for Computerized Operating Procedure Systems

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.; Higgins, J.

    2010-02-26

    Increasingly nuclear power plant procedures, such as emergency operating procedures, are being presented in computer form with functionality to support operator use and management of the procedures. The U.S. Nuclear Regulatory Commission (NRC) currently has guidance for the review of computer-based procedures (CBPs); however, there remain CBP functions and human performance issues for which up-to-date guidance is lacking. The Institute of Electrical and Electronics Engineers (IEEE) has initiated a standard development effort to address the human factors engineering (HFE) aspects of CBP systems. When completed, it may provide guidance to supplement the NRC staff's review criteria. The purpose of our study was to evaluate the suitability of the IEEE Standard for use in the NRC's HFE safety reviews of CBP systems and to ensure that the guidance meets the NRC's standard for scientific and engineering rigor used in its own guidance development efforts. We established the following criteria with which to evaluate the Standard: (1) it should meet an existing need of NRC reviewers, (2) it should be based in sound HFE principles, (3) it should be thoroughly peer-reviewed, and (4) it should address CBP-related human performance issues identified in the literature. This report describes the methodology we used to evaluate each criterion. Our evaluation concluded that the Standard generally does meet these criteria, however several areas were identified for which additional clarifications are needed. Thus consideration of the Standard's use by the NRC is supported. The standard evaluation methodology developed in this study can be generally applied to the review of other HFE standards being considered for possible use or endorsement by the NRC.

  5. Standard operational procedures for low sexual desire in men.

    Science.gov (United States)

    Rubio-Aurioles, Eusebio; Bivalacqua, Trinity J

    2013-01-01

    Low sexual desire in men is a condition that has received little attention; nevertheless it occurs with high frequency. Clinicians are in need of clear guidelines to address this problem. To develop standardized operational procedures to be implemented with men presenting low sexual desire/interest (LSD/I). Review of relevant evidence-based literature and published guidelines, integrated with expert opinion. Operational procedures for LSD/I that are recommended for clinical practice with various degrees of support from published evidence. A new classification scheme is proposed; LSD/I is proposed as an umbrella term for which hypoactive sexual desire disorder (HSDD) is only a subtype. The following standard operational procedures are described: (i) Detection of LSD/I: screening for LSD/I, screening for LSD/I in patients with other sexual dysfunctions; (ii) Diagnosis and assessment of etiology: diagnostic criteria for LSD/I, assessment of depression status, assessment of relationship status, assessment of endocrinologic status, diagnostic criteria for HSDD in men; (iii) treatment of LSD/I secondary to low testosterone, treatment of LSD/I secondary to elevated prolactin, treatment of LSD/I secondary to other endocrinologic disorders, treatment of LSD/I secondary to depressive illness and or anxiety disorders, treatment of LSD/I secondary to relationship conflict and treatment of HSDD. A diagnostic and treatment algorithm is presented. LSD/I is a common condition that should be identified in patients; it is recommended that this condition be actively investigated by the clinician. Once the diagnosis of LSD/I in men is confirmed, a thorough search for possible causes needs to include both biological and psychological causes. TREATMENT should be etiologically oriented. © 2012 International Society for Sexual Medicine.

  6. The European Stroke Organisation Guidelines: a standard operating procedure.

    Science.gov (United States)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria; Christensen, Hanne; De Keyser, Jacques; Diener, Hans-Christoph; Diez-Tejedor, Exuperio; Ferro, Jose M; Ford, Gary A; Grau, Armin; Keller, Emanuella; Leys, Didier; Russell, David; Toni, Danilo; Turc, Guillaume; Van der Worp, Bart; Wahlgren, Nils; Steiner, Thorsten

    2015-10-01

    In 2008, the recently founded European Stroke Organisation published its guidelines for the management of ischemic stroke and transient ischemic attack. This highly cited document was translated in several languages and was updated in 2009. Since then, the European Stroke Organisation has published guidelines for the management of intracranial aneurysms and subarachnoidal hemorrhage, for the establishment of stroke units and stroke centers, and recently for the management of intracerebral hemorrhage. In recent years, the methodology for the development of guidelines has evolved significantly. To keep pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical model of a single Guideline Document about a major topic (e.g. management of ischemic stroke) to focused modules (i.e. subdivisions of a major topic). This will enable the European Stroke Organisation to react faster when new developments in a specific stroke field occur and update its recommendations on the related module rather swiftly; with the previous approach of a single large Guideline Document, its entire revision had to be completed before an updated publication, delaying the production of up-to-date guidelines. After discussion within the European Stroke Organisation Guidelines Committee and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for

  7. The European Stroke Organisation Guidelines: a standard operating procedure

    DEFF Research Database (Denmark)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria

    2015-01-01

    cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical...... on the related module rather swiftly; with the previous approach of a single large Guideline Document, its entire revision had to be completed before an updated publication, delaying the production of up-to-date guidelines. After discussion within the European Stroke Organisation Guidelines Committee...

  8. 16 CFR 1201.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... structural framing and bracing members shall be steel angles 3 inches by 5 inches by 1/4 inch (7.7... paragraphs (c) (1) and (2) of this section. (2) Accelerated environmental durability tests. Each specimen of... annealed glass are not required to be subjected to the accelerated environmental durability tests. Table 1...

  9. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    Science.gov (United States)

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2017-01-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  10. Installing and Testing a Server Operating System

    OpenAIRE

    Lorentz JÄNTSCHI

    2003-01-01

    The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation usin...

  11. 40 CFR 60.685 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standard of Performance for Wool Fiberglass Insulation Manufacturing Plants § 60.685 Test methods and procedures. (a) In conducting the performance tests...

  12. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    Energy Technology Data Exchange (ETDEWEB)

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  13. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    requirements for multifunctional integrated lighting rear lamp for cars (CRP) Section 7.Characterization techniques and test procedure requirements for micro-fresnel lenses for cell phone flash lights (HEPTAGON) Section 8.Characterization techniques and test procedure requirements for 5 Pin Ric Connector...

  14. 49 CFR 572.154 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.154... 12-Month-Old Infant, Alpha Version § 572.154 Thorax assembly and test procedure. (a) Thorax Assembly (refer to § 572.150(a)(1)(iv)) . The thorax consists of the part of the torso assembly shown in drawing...

  15. 49 CFR 572.74 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Thorax assembly and test procedure. 572.74 Section...-Year-Old Child § 572.74 Thorax assembly and test procedure. (a) Thorax assembly. The thorax consists of... Weld Ass'y.”, dated September 24, 1996). (b) Thorax assembly requirements. When the thorax is impacted...

  16. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  17. 40 CFR 91.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  18. 16 CFR 1630.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ..., flat, with a nominal heat of combustion value of 7180 calories/gram, a mass of 150 mg ±5 mg and a... a fire-retardant treatment, or is made of fibers which have had a fire-retardant treatment, the..., and drying shall be performed in accordance with section 8.3.1(A) of that test method, Tumble Dry...

  19. 16 CFR 1631.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... source. A methenamine tablet, flat, with a nominal heat of combustion value of 7180 calories/gram, a mass... a fire-retardant treatment, or is made of fibers which have had a fire-retardant treatment, the..., and drying shall be performed in accordance with section 8.3.1(A) of that test method, Tumble Dry...

  20. 16 CFR 1615.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... position and to prevent curling of the specimen when the flame is applied. It shall consist of two U-shaped... adjust the height of the flame. The barrel of the burner shall be at an angle of 25° from the vertical... environment surrounding the test chamber. This enclosure shall have a fan or other suitable means for...

  1. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  2. A Statistical Procedure for Assessing Test Dimensionality.

    Science.gov (United States)

    1984-03-09

    imagine applications in other fields. As an illustra- tion, suppose that medical subjects (the units) undergo allergy sensitivity tests to various...Inferences about the dimensionality of e become meaningful In attempting to develop a clas- sIfication scheme for allergies . Description of the Statistic A...Washington Computer Based Education Research Lab Alexandria, VA 22314 252 Engineering Research Laboratory Urbana, IL 61801 1 Dr. David J. kiss M60

  3. Test plans of the high temperature test operation at HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30 MW with the reactor outlet coolant temperature at 950 degrees centigrade. (author)

  4. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  5. 10 CFR 55.45 - Operating tests.

    Science.gov (United States)

    2010-01-01

    ... facility's auxiliary and emergency systems, including operation of those controls associated with plant... 10 Energy 2 2010-01-01 2010-01-01 false Operating tests. 55.45 Section 55.45 Energy NUCLEAR... to accomplish a representative sample from among the following 13 items. (1) Perform pre-startup...

  6. Quality assurance: Importance of systems and standard operating procedures.

    Science.gov (United States)

    Manghani, Kishu

    2011-01-01

    It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  7. Standard Operating Procedures for Female Genital Sexual Pain

    DEFF Research Database (Denmark)

    Fugl-Meyer, Kerstin S; Bohm-Starke, Nina; Damsted Petersen, Christina

    2012-01-01

    , but rather a localized genial pain syndrome, others adhere to using clearly sexually related terms such as dyspareunia and vaginismus. Aim.  The aims of this brief review are to present definitions of the different types of female GSP. Their etiology, incidence, prevalence, and comorbidity with somatic...... and psychological disorders are highlighted, and different somatic and psychological assessment and treatment modalities are discussed. Methods.  The Standard Operating Procedures (SOP) committee was composed of a chair and five additional experts. No corporate funding or remuneration was received. The authors...... therapeutic interventions. However, this international expert group will recommend guidelines for management of female GSP. Conclusions.  GSP disorders are complex. It is recommended that their evaluation and treatment are performed through comprehensive somato-psychological multidisciplinary approach. Fugl...

  8. Increased efficiency of endocrine procedures performed in an ambulatory operating room.

    Science.gov (United States)

    Clark, Nicholas; Schneider, David F; Vrabec, Sara; Bauer, Philip S; Chen, Herbert; Sippel, Rebecca S

    2013-09-01

    Thyroid and parathyroid procedures historically have been viewed as inpatient procedures. Because of the advancements in surgical techniques, these procedures were transferred from the inpatient operating room (OR) to the outpatient OR at a single academic institution approximately 7 y ago. The goal of this study was to determine whether this change has decreased turnover times and maximized OR utilization. We performed a retrospective review of 707 patients undergoing thyroid (34%) and parathyroid (66%) procedures by a single surgeon at our academic institution between 2005 and 2008. Inpatient and outpatient groups were compared using Student t-test, chi-square test, or the Kruskal-Wallis test where appropriate. Multiple regression analysis was used to determine how patient and hospital factors influenced turnover times. Turnover times were significantly lower in the outpatient OR (mean 18 ± 0.7 min) when compared with the inpatient OR (mean 36 ± 1.4 min) (P operative indication of cancer (23.1% versus 9.2%, P < 0.001). Using multiple regression, the inpatient OR remained highly significantly associated with higher turnover times when controlling for these small differences (P < 0.001). Endocrine procedures performed in the outpatient OR have significantly faster turnover times leading to cost savings and greater OR utilization for hospitals. Copyright © 2013 Elsevier Inc. All rights reserved.

  9. 40 CFR 600.111-80 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... continuously), carbon monoxide, and carbon dioxide. (4) The fuel economy measurement cycle of the test includes... the initiation of the highway fuel economy test (preconditioning cycle), the start-up procedure must... stalls during the measurement cycle of the highway fuel economy test, the test is voided, corrective...

  10. Radiation exposure to eye lens and operator hands during endovascular procedures in hybrid operating rooms.

    Science.gov (United States)

    Attigah, Nicolas; Oikonomou, Kyriakos; Hinz, Ulf; Knoch, Thomas; Demirel, Serdar; Verhoeven, Eric; Böckler, Dittmar

    2016-01-01

    The purpose of this study was to evaluate the radiation exposure of vascular surgeons' eye lens and fingers during complex endovascular procedures in modern hybrid operating rooms. Prospective, nonrandomized multicenter study design. One hundred seventy-one consecutive patients (138 male; median age, 72.5 years [interquartile range, 65-77 years]) underwent an endovascular procedure in a hybrid operating room between March 2012 and July 2013 in two vascular centers. The dose-area product (DAP), fluoroscopy time, operating time, and amount of contrast dye were registered prospectively. For radiation dose recordings, single-use dosimeters were attached at eye level and to the ring finger of the hand next to the radiation field of the operator for each endovascular procedure. Dose recordings were evaluated by an independent institution. Before the study, precursory investigations were obtained to simulate the radiation dose to eye lens and fingers with an Alderson phantome (RSD, Long Beach, Calif). Interventions were classified into six treatment categories: endovascular repair of infrarenal abdominal aneurysm (n = 65), thoracic endovascular aortic repair (n = 32), branched endovascular aortic repair for thoracoabdominal aneurysms (n = 17), fenestrated endovascular aortic repair for complex abdominal aortic aneurysm, (n = 25), iliac branched device (n = 8), and peripheral interventions (n = 24). There was a significant correlation in DAP between both lens (P exposure to the eyes can be obtained. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  11. Improved Design of Crew Operation in Computerized Procedure System of APR1400

    Energy Technology Data Exchange (ETDEWEB)

    Seong, No Kyu; Jung, Yeon Sub; Sung, Chan Ho [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The operators perform the paper-based procedures in analog-based conventional main control room (MCR) depending on only communications between operators except a procedure controller such as a Shift Supervisor (SS), however in digital-based MCR the operators can confirm the procedures simultaneously in own console when the procedure controller of computerized procedure (CP) opens the CP. The synchronization and a synchronization function between procedure controller and other operators has to be considered to support the function of crew operation. This paper suggests the improved design of crew operation in computerized procedure system of APR1400. This paper suggests the improved design of APR1400 CPS. These improvements can help operators perform the crew procedures more efficiently. And they reduce a burden of communication and misunderstanding of computerized procedures. These improvements can be applied to CPS after human factors engineering verification and validation.

  12. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... alternative standards for coke oven doors under § 63.305; work practice emission control plan requirements in... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise... coke oven battery, the results of which shall be used in accordance with procedures specified in this...

  14. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  15. Multiple Group Testing Procedures for Analysis of High-Dimensional Genomic Data

    Directory of Open Access Journals (Sweden)

    Hyoseok Ko

    2016-12-01

    Full Text Available In genetic association studies with high-dimensional genomic data, multiple group testing procedures are often required in order to identify disease/trait-related genes or genetic regions, where multiple genetic sites or variants are located within the same gene or genetic region. However, statistical testing procedures based on an individual test suffer from multiple testing issues such as the control of family-wise error rate and dependent tests. Moreover, detecting only a few of genes associated with a phenotype outcome among tens of thousands of genes is of main interest in genetic association studies. In this reason regularization procedures, where a phenotype outcome regresses on all genomic markers and then regression coefficients are estimated based on a penalized likelihood, have been considered as a good alternative approach to analysis of high-dimensional genomic data. But, selection performance of regularization procedures has been rarely compared with that of statistical group testing procedures. In this article, we performed extensive simulation studies where commonly used group testing procedures such as principal component analysis, Hotelling's T2 test, and permutation test are compared with group lasso (least absolute selection and shrinkage operator in terms of true positive selection. Also, we applied all methods considered in simulation studies to identify genes associated with ovarian cancer from over 20,000 genetic sites generated from Illumina Infinium HumanMethylation27K Beadchip. We found a big discrepancy of selected genes between multiple group testing procedures and group lasso.

  16. Factorial Invariance in Multiple Populations: A Multiple Testing Procedure

    Science.gov (United States)

    Raykov, Tenko; Marcoulides, George A.; Millsap, Roger E.

    2013-01-01

    A multiple testing method for examining factorial invariance for latent constructs evaluated by multiple indicators in distinct populations is outlined. The procedure is based on the false discovery rate concept and multiple individual restriction tests and resolves general limitations of a popular factorial invariance testing approach. The…

  17. Standard operating procedures for ESPEN guidelines and consensus papers.

    Science.gov (United States)

    Bischoff, Stephan C; Singer, Pierre; Koller, Michael; Barazzoni, Rocco; Cederholm, Tommy; van Gossum, André

    2015-12-01

    The ESPEN Guideline standard operating procedures (SOP) is based on the methodology provided by the Association of Scientific Medical Societies of Germany (AWMF), the Scottish Intercollegiate Guidelines Network (SIGN), and the Centre for Evidence-based Medicine at the University of Oxford. The SOP is valid and obligatory for all future ESPEN-sponsored guideline projects aiming to generate high-quality guidelines on a regular basis. The SOP aims to facilitate the preparation of guideline projects, to streamline the consensus process, to ensure quality and transparency, and to facilitate the dissemination and publication of ESPEN guidelines. To achieve this goal, the ESPEN Guidelines Editorial board (GEB) has been established headed by two chairmen. The GEB will support and supervise the guideline processes and is responsible for the strategic planning of ESPEN guideline activities. Key elements of the SOP are the generation of well-built clinical questions according to the PICO system, a systemic literature search, a classification of the selected literature according to the SIGN evidence levels providing an evidence table, and a clear and straight-forward consensus procedure consisting of online voting's and a consensus conference. Only experts who meet the obligation to disclosure any potential conflict of interests and who are not employed by the Industry can participate in the guideline process. All recommendations will be graded according to the SIGN grading and novel outcome models besides biomedical endpoints. This approach will further extent the leadership of ESPEN in creating up-to-date and suitable for implementation guidelines and in sharing knowledge on malnutrition and clinical nutrition. Copyright © 2015 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  18. High Voltage Testing. Volume 2. Specifications and Test Procedures

    Science.gov (United States)

    1982-08-01

    using the two wattmeter method the wattmeters must be read accurately. Because of the low power factor, the reading of one wattmeter will be negative...each part to be tested - A minimum of two of each type of terminal. 4.12.7.2 Soldering iron method - The test shal l be performed on solder...tested - A minimum of two of each type of terminal. 4.8.2.2 Soldering iron method . The test shall be performed on solder terminations, attached to the

  19. Speaker Authentication Operational Test and Evaluation.

    Science.gov (United States)

    1980-04-01

    designed to choose , from a set of known talkers, the candidate whose speech mst closely matches the unknown speech segment. Text indepe-ent recognition...makes a determination as to the sneaker identity. 2.3 IMImcD SPEAKER RMXMTION TEST BED Both sneaker recoqnition technioues were implemented and...list, the operator enters a "g". The system then asks for the model name to be entered on the operator console. If the name is correctly entered, the

  20. Numerical comparison between different strength after impact test procedures

    Directory of Open Access Journals (Sweden)

    Klaus M.

    2010-06-01

    Full Text Available Different procedures are established to investigate the residual properties of sandwich panels after impact damage. Two used procedures for the testing of this properties are compression after impact (CAI and 4-point bending. In this paper a numerical procedure is presented for a first prediction of the behaviour of pre-damaged sandwich specimens under different boundary conditions (or testing procedures. A sequence of impact experiments using a drop tower is performed to assess the damage tolerance of sandwich panels with aramid paper foldcores and CFRP skins. The tested impact energy range allowed to investigate a variety of damage scenarios from barely visible damages (BVID to fibre fractures in all plies of the impacted face sheet. Additionally 4-point bending tests are performed with the panels previously damaged by impact loadings to assess the residual bending strength of these samples. The developed numerical procedure is used to reproduce these experiments (the impact as well as the 4-point bending tests. Also the same procedure is employed in an attempt to predict the behaviour of samples with the same build-up in simulated compression after impact tests.

  1. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... produce test results which measure energy efficiency, energy use, or estimated annual operating cost of a... electricity. In the existing test procedures for direct heating equipment, fossil-fuel energy consumption is..., fossil- fuel standby mode is included but off mode is not included. Electrical energy consumption in...

  2. 76 FR 34801 - Petition for Modification of Single Car Air Brake Test Procedures

    Science.gov (United States)

    2011-06-14

    ... Federal Railroad Administration Petition for Modification of Single Car Air Brake Test Procedures In... locomotives in ``work'' trains, where the friction brakes operate in conjunction with the RT2 system of straight air brake employed on PATH cars. The single car air brake test described in Association of...

  3. Benchmarking an operational procedure for rapid flood mapping and risk assessment in Europe

    Science.gov (United States)

    Dottori, Francesco; Salamon, Peter; Kalas, Milan; Bianchi, Alessandra; Feyen, Luc

    2016-04-01

    The development of real-time methods for rapid flood mapping and risk assessment is crucial to improve emergency response and mitigate flood impacts. This work describes the benchmarking of an operational procedure for rapid flood risk assessment based on the flood predictions issued by the European Flood Awareness System (EFAS). The daily forecasts produced for the major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations, based on the hydro-meteorological dataset of EFAS. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in near real-time in terms of flood prone areas, potential economic damage, affected population, infrastructures and cities. An extensive testing of the operational procedure is carried out using the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-derived flood footprints, while ground-based estimations of economic damage and affected population is compared against modelled estimates. We evaluated the skill of flood hazard and risk estimations derived from EFAS flood forecasts with different lead times and combinations. The assessment includes a comparison of several alternative approaches to produce and present the information content, in order to meet the requests of EFAS users. The tests provided good results and showed the potential of the developed real-time operational procedure in helping emergency response and management.

  4. Corrosion performance tests for reinforcing steel in concrete : test procedures.

    Science.gov (United States)

    2009-09-01

    The existing test method to assess the corrosion performance of reinforcing steel embedded in concrete, mainly : ASTM G109, is labor intensive, time consuming, slow to provide comparative results, and often expensive. : However, corrosion of reinforc...

  5. A Multiscale Enrichment Procedure for Nonlinear Monotone Operators

    KAUST Repository

    Efendiev, Yalchin R.

    2014-03-11

    In this paper, multiscale finite element methods (MsFEMs) and domain decomposition techniques are developed for a class of nonlinear elliptic problems with high-contrast coefficients. In the process, existing work on linear problems [Y. Efendiev, J. Galvis, R. Lazarov, S. Margenov and J. Ren, Robust two-level domain decomposition preconditioners for high-contrast anisotropic flows in multiscale media. Submitted.; Y. Efendiev, J. Galvis and X. Wu, J. Comput. Phys. 230 (2011) 937–955; J. Galvis and Y. Efendiev, SIAM Multiscale Model. Simul. 8 (2010) 1461–1483.] is extended to treat a class of nonlinear elliptic operators. The proposed method requires the solutions of (small dimension and local) nonlinear eigenvalue problems in order to systematically enrich the coarse solution space. Convergence of the method is shown to relate to the dimension of the coarse space (due to the enrichment procedure) as well as the coarse mesh size. In addition, it is shown that the coarse mesh spaces can be effectively used in two-level domain decomposition preconditioners. A number of numerical results are presented to complement the analysis.

  6. Quality assurance: Importance of systems and standard operating procedures

    Directory of Open Access Journals (Sweden)

    Kishu Manghani

    2011-01-01

    Full Text Available It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  7. New Procedure for Account Operations at the CERN Service Desk

    CERN Multimedia

    The Computer Security Team

    2011-01-01

    Who can activate your computing account? Who can unblock it? And who can reset your password if you've forgotten it? Until recently, users who addressed such problems to the Service Desk were asked a set of questions...   The corresponding answers were designed to properly verify the requestor’s identity such that only the real owner could activate/unblock/reset his computing account. However, it turned out that the answers were easily obtainable (and that there is no better set of questions to ask). Therefore, in order to ensure optimal protection of your account, this procedure will be replaced on 28 November 2011. From that date on, users will be asked to produce a physical ID when requesting the Service Desk to perform operations like computer account activation, account unblocking or password resets. This physical ID can either be a passport/ID card or the CERN access card. If you need to activate/unblock/reset your computing account, you will either have to produ...

  8. 30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?

    Science.gov (United States)

    2010-07-01

    ... during drilling operations? 250.408 Section 250.408 Mineral Resources MINERALS MANAGEMENT SERVICE... Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or equipment during drilling operations? You may use alternative procedures or equipment during drilling operations...

  9. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...

  10. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  11. 49 CFR 325.59 - Measurement procedure; stationary test.

    Science.gov (United States)

    2010-10-01

    ... open throttle. Return the engine's speed to idle. (e) Observe the maximum reading on the sound level.... Record that reading, if the reading has not been influenced by extraneous noise sources such as motor vehicles operating on adjacent roadways. (f) Repeat the procedures specified in paragraphs (d) and (e) of...

  12. Drawbar Pull (DP) Procedures for Off-Road Vehicle Testing

    Science.gov (United States)

    Creager, Colin; Asnani, Vivake; Oravec, Heather; Woodward, Adam

    2017-01-01

    As NASA strives to explore the surface of the Moon and Mars, there is a continued need for improved tire and vehicle development. When tires or vehicles are being designed for off-road conditions where significant thrust generation is required, such as climbing out of craters on the Moon, it is important to use a standard test method for evaluating their tractive performance. The drawbar pull (DP) test is a way of measuring the net thrust generated by tires or a vehicle with respect to performance metrics such as travel reduction, sinkage, or power efficiency. DP testing may be done using a single tire on a traction rig, or with a set of tires on a vehicle; this report focuses on vehicle DP tests. Though vehicle DP tests have been used for decades, there are no standard procedures that apply to exploration vehicles. This report summarizes previous methods employed, shows the sensitivity of certain test parameters, and provides a body of knowledge for developing standard testing procedures. The focus of this work is on lunar applications, but these test methods can be applied to terrestrial and planetary conditions as well. Section 1.0 of this report discusses the utility of DP testing for off-road vehicle evaluation and the metrics used. Section 2.0 focuses on test-terrain preparation, using the example case of lunar terrain. There is a review of lunar terrain analogs implemented in the past and a discussion on the lunar terrain conditions created at the NASA Glenn Research Center, including methods of evaluating the terrain strength variation and consistency from test to test. Section 3.0 provides details of the vehicle test procedures. These consist of a review of past methods, a comprehensive study on the sensitivity of test parameters, and a summary of the procedures used for DP testing at Glenn.

  13. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B.H.; Dam, J.J.D. van; Delft, D.R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  14. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  15. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion... for smoldering combustion. This section provides the test method for determining smoldering combustion... removable extension top extending 8±.5 cm. above the top of the smolder box shall also be provided. The...

  16. Quality Assurance Plan for the AL3 Test Procedure

    CERN Document Server

    Béjar-Alonso, Isabel

    1999-01-01

    This paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the services involved (fire brigade, maintenance and computer support) and to create a consistent documentation. When the procedures are implemented, it will be possible to determine with confidence how field actions are carried out and to measure actual performance. The focus will be on personnel training and documentation. It is important however to keep documentation and procedures to a reasonable level that can be maintained at appropriate intervals. The plan is the result of an internal requirement from ST/MC and a formal request from Installations Nucléaires de Base (INB).

  17. Standard operating procedures in the disorders of orgasm and ejaculation.

    Science.gov (United States)

    McMahon, Chris G; Jannini, Emmanuele; Waldinger, Marcel; Rowland, David

    2013-01-01

    Ejaculatory/orgasmic disorders are common male sexual dysfunctions and include premature ejaculation (PE), inhibited ejaculation, anejaculation, retrograde ejaculation, and anorgasmia. To provide recommendations and guidelines of the current state-of-the-art knowledge for management of ejaculation/orgasmic disorders in men as standard operating procedures (SOPs) for the treating health care professional. The International Society of Sexual Medicine Standards Committee assembled over 30 multidisciplinary experts to establish SOPs for various male and female sexual medicine topics. The SOP for the management of disorders of orgasm and ejaculation represents the opinion of four experts from four countries developed in a process over a 2-year period. Expert opinion was based on grading of evidence-based medical literature, limited expert opinion, widespread internal committee discussion, public presentation, and debate. PE management is largely dependent upon etiology. Lifelong PE is best managed with PE pharmacotherapy (selective serotonin reuptake inhibitors and/or topical anesthetics). The management of acquired PE is etiology specific and may include erectile dysfunction (ED) pharmacotherapy in men with comorbid ED. All men seeking treatment for PE should receive basic psychosexual education. Graded behavioral therapy is indicated when psychogenic or relationship factors are present and is often best combined with PE pharmacotherapy in an integrated treatment program. Delayed ejaculation, anejaculation, and/or anorgasmia may have a biogenic and/or psychogenic etiology. Men with age-related penile hypoanesthesia should be educated, reassured, and instructed in revised sexual techniques which maximize arousal. Retrograde ejaculation is managed by education, patient reassurance, and pharmacotherapy. Additional research is required to further the understanding of the disorders of ejaculation and orgasm. © 2012 International Society for Sexual Medicine.

  18. Testing Procedure for the Single Fiber Fragmentation Test

    DEFF Research Database (Denmark)

    Feih, Stefanie; Wonsyld, Karen; Minzari, Daniel

    This report describes the details of the single fiber fragmentation test as conducted at the materials research department (AFM) at Risø. The equipment and specimen manufacture is described in detail. Furthermore, examples of results interpretation are given. For the experiments in this report......, specimens with one E-glass fiber placed inside an epoxy or polyester matrix were used. Elongating the specimens with a mini tensile tester, which was placed under a microscope, leads to fiber fragmentations. Different bonding strengths between fiber and matrix result in differences in the critical fracture...

  19. Tiltrotor Acoustic Flight Test: Terminal Area Operations

    Science.gov (United States)

    SantaMaria, O. L.; Wellman, J. B.; Conner, D. A.; Rutledge, C. K.

    1991-01-01

    This paper provides a comprehensive description of an acoustic flight test of the XV- 15 Tiltrotor Aircraft with Advanced Technology Blades (ATB) conducted in August and September 1991 at Crows Landing, California. The purpose of this cooperative research effort of the NASA Langley and Ames Research Centers was to obtain a preliminary, high quality database of far-field acoustics for terminal area operations of the XV-15 at a takeoff gross weight of approximately 14,000 lbs for various glide slopes, airspeeds, rotor tip speeds, and nacelle tilt angles. The test also was used to assess the suitability of the Crows Landing complex for full scale far-field acoustic testing. This was the first acoustic flight test of the XV-15 aircraft equipped with ATB involving approach and level flyover operations. The test involved coordination of numerous personnel, facilities and equipment. Considerable effort was made to minimize potential extraneous noise sources unique to the region during the test. Acoustic data from the level flyovers were analyzed, then compared with data from a previous test of the XV-15 equipped with Standard Metal Blades

  20. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Procedure with respect to amateur radio... Procedures § 1.957 Procedure with respect to amateur radio operator license. Each candidate for an amateur... certificate for sucessful completion of an amateur radio operator examination. The VEC will forward the...

  1. Multiple Hypotheses Testing Procedures in Clinical Trials and Genomic Studies

    Directory of Open Access Journals (Sweden)

    Qing ePan

    2013-12-01

    Full Text Available We review and compare multiple hypothesis testing procedures used in clinical trials and those in genomic studies. Clinical trials often employ global tests, which draw an overall conclusion for all the hypotheses, such as SUM test, Two-Step test, Approximate Likelihood Ratio test (ALRT, Intersection Union Test (IUT and MAX test. The SUM and Two-Step tests are most powerful under homogeneous treatment effects, while the ALRT and MAX test are robust in cases with nonhomogeneous treatment effects. Furthermore, the ALRT is robust to unequal sample sizes across endpoints. In genomic studies, stepwise procedures are used to draw marker-specific conclusions and control family wise error rate (FWER or false discovery rate (FDR at the same time. FDR refers to the percent of false positives among all significant results and is preferred over FWER in screening high-dimensional genomic markers due to its interpretability. In cases where correlations between test statistics cannot be ignored, Westfall-Young resampling method can be employed to generate the joint distribution of P-values under the null and maintain their correlation structure. Finally, the GWAS from a clinical trial studying microvascular complications among Type 1 diabetes patients is used to illustrate various procedures.

  2. In-office vs. operating room procedures for recurrent respiratory papillomatosis.

    Science.gov (United States)

    Miller, Anya J; Gardner, Glendon M

    2017-01-01

    We conducted a study to analyze hospital and patient costs, outcomes, and patient satisfaction among adults undergoing in-office and operating room procedures for the treatment of recurrent respiratory papillomatosis. Our final study population was made up of 17 patients-1 man and 16 women, aged 30 to 86 years (mean: 62). The mean number of in-office laser procedures per patient was 4.2, and the mean interval between procedures was 5.4 months (although 10 patients underwent only 1 office procedure); the mean number of operating room procedures was 13.5, and the mean interval between procedures was 14.3 months. An equal number of patients reported complications or adverse events with the two types of procedures-5 each. The difference in cost between the office procedure (mean: $3,413.00) and the operating room procedure (mean: $12,382.59) was almost $9,000, but these savings were offset by the fact that the office procedures needed to be performed three times as often. Patients reported slightly more anxiety and discomfort during the office procedures and, overall, they appeared to prefer the operating room procedure. We conclude that office procedures are significantly more cost-effective than operating room procedures, but their use may be limited by patient tolerance and the increased frequency of the procedure.

  3. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... consumer demand, 2) determined timing for the commitment to subsequent replenishment during the selling seasons within acceptable forecast uncertainty, and 3) facilitated collaborative forecasting with more accurate forecast updates. However, during the empirical test, the forecast updating procedure...

  4. TVT-Exact and midurethral sling (SLING-IUFT) operative procedures: a randomized study.

    Science.gov (United States)

    Aniuliene, Rosita; Aniulis, Povilas; Skaudickas, Darijus

    2015-01-01

    The aim of the study is to compare results, effectiveness and complications of TVT exact and midurethral sling (SLING-IUFT) operations in the treatment of female stress urinary incontinence (SUI). A single center nonblind, randomized study of women with SUI who were randomized to TVT-Exact and SLING-IUFT was performed by one surgeon from April 2009 to April 2011. SUI was diagnosed on coughing and Valsalva test and urodynamics (cystometry and uroflowmetry) were assessed before operation and 1 year after surgery. This was a prospective randomized study. The follow up period was 12 months. 76 patients were operated using the TVT-Exact operation and 78 patients - using the SLING-IUFT operation. There was no statistically significant differences between groups for BMI, parity, menopausal status and prolapsed stage (no patients had cystocele greater than stage II). Mean operative time was significantly shorter in the SLING-IUFT group (19 ± 5.6 min.) compared with the TVT-Exact group (27 ± 7.1 min.). There were statistically significant differences in the effectiveness of both procedures: TVT-Exact - at 94.5% and SLING-IUFT - at 61.2% after one year. Hospital stay was statistically significantly shorter in the SLING-IUFT group (1. 2 ± 0.5 days) compared with the TVT-Exact group (3.5 ± 1.5 days). Statistically significantly fewer complications occurred in the SLING-IUFT group. the TVT-Exact and SLING-IUFT operations are both effective for surgical treatment of female stress urinary incontinence. The SLING-IUFT involved a shorter operation time and lower complications rate., the TVT-Exact procedure had statistically significantly more complications than the SLING-IUFT operation, but a higher effectiveness.

  5. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    Energy Technology Data Exchange (ETDEWEB)

    Rice, C. Keith [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Munk, Jeffrey D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shrestha, Som S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  6. The LHC test string first operational experience

    CERN Document Server

    Bézaguet, Alain-Arthur; Casas-Cubillos, J; Coull, L; Cruikshank, P; Dahlerup-Petersen, K; Faugeras, Paul E; Flemsæter, B; Guinaudeau, H; Hagedorn, Dietrich; Hilbert, B; Krainz, G; Kos, N; Lavielle, D; Lebrun, P; Leo, G; Mathewson, A G; Missiaen, D; Momal, F; Parma, Vittorio; Quesnel, Jean Pierre; Richter, D; Riddone, G; Rijllart, A; Rodríguez-Mateos, F; Rohmig, P; Saban, R I; Schmidt, R; Serio, L; Skiadelli, M; Suraci, A; Tavian, L; Walckiers, L; Wallén, E; Van Weelderen, R; Williams, L; McInturff, A

    1996-01-01

    CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC.

  7. THE ASSESSMENT PROCEDURE OF THE OPERATIONAL RISK EVENTS

    OpenAIRE

    Iulia Iuga

    2009-01-01

    A credit institution must establish a management framework of the operational risk.This framework must cover the appetite and tolerance to the operational risk of a credit institution,in accordance with the management policies of this risk, including the measure and method inwhich the operational risk is transferred outside the credit institution.The management framework of the operational risk should include policies and processes for theidentification, assessment, monitoring and control/dim...

  8. Investigations into the efficacy of different procedures for surgical hand disinfection between consecutive operations.

    Science.gov (United States)

    Rehork, B; Rüden, H

    1991-10-01

    In order to examine whether thorough surgical hand disinfection (handwashing plus hand disinfection) between consecutive operations is necessary, tests were carried out simulating normal clinical conditions. The tests were performed according to the guidelines for the evaluation of disinfection procedures of the German Society for Hygiene and Microbiology. Surgical hand disinfection was as follows: handwashing with soap without antimicrobial additives and subsequent 5-min disinfection with 60% n-propanol. This was followed by simulated operations of 30 or 120 min duration with a 30-min break between operations, during which half of the test group kept on the surgical gloves, while the other half removed them. The second surgical hand disinfection was done without prior handwashing by 50% of the test group. The disinfection time was reduced from 5 to 1 min by 50% of the test group. The results were evaluated by means of explorative data analysis and inductive statistical methods. Removing the surgical gloves during the interoperative break did not result in significantly higher numbers of colony forming units (cfu) compared with retaining the gloves. This was also the case after a subsequent handwashing. At the second surgical hand disinfection, after a simulated operation of 60 min duration (including break), there was no significant difference in the numbers of cfus between the test group who had washed their hands and those who had not. Reducing the disinfection time from 5 min to 1 min was not associated with a significant increase in the number of cfus. However, after a simulated operating time of 150 min (including the break), the second surgical hand disinfection with handwashing resulted in a significantly lower number of microorganisms than disinfection alone. In half the tests, the numbers of cfu were significantly lower when the test group disinfected their hands for 5 min rather than 1 min.

  9. Quality of operation notes following orthopaedic procedures in a ...

    African Journals Online (AJOL)

    Clarity of documentation is essential for good record keeping, audit, follow-up and medico-legal defense. ... Conclusions: We conclude that a clearly written standard protocol for writing operation notes or electronic recording of operative notes in developing countries will prevent such glaring lapses in operation notes and ...

  10. 40 CFR 86.1227-96 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... of prescribed sequences of fueling, parking, and operating conditions. Vehicles are tested only for... engine-off periods. It is associated with a series of events representative of heavy-duty vehicle...

  11. 40 CFR 86.127-96 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... consists of prescribed sequences of fueling, parking, and operating conditions. Vehicles are tested for any... with a series of events that a vehicle may experience and that may result in hydrocarbon and/or...

  12. Motor operated valves problems tests and simulations

    Energy Technology Data Exchange (ETDEWEB)

    Pinier, D.; Haas, J.L.

    1996-12-01

    An analysis of the two refusals of operation of the EAS recirculation shutoff valves enabled two distinct problems to be identified on the motorized valves: the calculation methods for the operating torques of valves in use in the power plants are not conservative enough, which results in the misadjustement of the torque limiters installed on their motorizations, the second problem concerns the pressure locking phenomenon: a number of valves may entrap a pressure exceeding the in-line pressure between the disks, which may cause a jamming of the valve. EDF has made the following approach to settle the first problem: determination of the friction coefficients and the efficiency of the valve and its actuator through general and specific tests and models, definition of a new calculation method. In order to solve the second problem, EDF has made the following operations: identification of the valves whose technology enables the pressure to be entrapped: the tests and numerical simulations carried out in the Research and Development Division confirm the possibility of a {open_quotes}boiler{close_quotes} effect: determination of the necessary modifications: development and testing of anti-boiler effect systems.

  13. Choreographer Pre-Testing Code Analysis and Operational Testing.

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, David J. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Harrison, Christopher B. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Perr, C. W. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Hurd, Steven A [Sandia National Laboratories (SNL-CA), Livermore, CA (United States)

    2014-07-01

    Choreographer is a "moving target defense system", designed to protect against attacks aimed at IP addresses without corresponding domain name system (DNS) lookups. It coordinates actions between a DNS server and a Network Address Translation (NAT) device to regularly change which publicly available IP addresses' traffic will be routed to the protected device versus routed to a honeypot. More details about how Choreographer operates can be found in Section 2: Introducing Choreographer. Operational considerations for the successful deployment of Choreographer can be found in Section 3. The Testing & Evaluation (T&E) for Choreographer involved 3 phases: Pre-testing, Code Analysis, and Operational Testing. Pre-testing, described in Section 4, involved installing and configuring an instance of Choreographer and verifying it would operate as expected for a simple use case. Our findings were that it was simple and straightforward to prepare a system for a Choreographer installation as well as configure Choreographer to work in a representative environment. Code Analysis, described in Section 5, consisted of running a static code analyzer (HP Fortify) and conducting dynamic analysis tests using the Valgrind instrumentation framework. Choreographer performed well, such that only a few errors that might possibly be problematic in a given operating situation were identified. Operational Testing, described in Section 6, involved operating Choreographer in a representative environment created through EmulyticsTM . Depending upon the amount of server resources dedicated to Choreographer vis-á-vis the amount of client traffic handled, Choreographer had varying degrees of operational success. In an environment with a poorly resourced Choreographer server and as few as 50-100 clients, Choreographer failed to properly route traffic over half the time. Yet, with a well-resourced server, Choreographer handled over 1000 clients without missrouting. Choreographer

  14. 75 FR 17075 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces and...

    Science.gov (United States)

    2010-04-05

    ... operating cost of a covered product during a representative average use cycle or period of use, as... electricity. The current test procedure accounts for all fossil-fuel energy consumption over a full-year cycle, thereby satisfying EISA 2007 requirements for fossil-fuel standby mode and off mode energy consumption...

  15. 14 CFR 23.1045 - Cooling test procedures for turbine engine powered airplanes.

    Science.gov (United States)

    2010-01-01

    ... powered airplanes. 23.1045 Section 23.1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... CATEGORY AIRPLANES Powerplant Cooling § 23.1045 Cooling test procedures for turbine engine powered airplanes. (a) Compliance with § 23.1041 must be shown for all phases of operation. The airplane must be...

  16. 75 FR 8524 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... Office of the Secretary 49 CFR Part 40 RIN 2105-AD67 Procedures for Transportation Workplace Drug and... owner-operators. Consequently, the Department certifies under the Regulatory Flexibility Act that this... WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Accordingly, the Interim Final Rule amending 49 CFR Part 40...

  17. Design and performance test of spacecraft test and operation software

    Science.gov (United States)

    Wang, Guohua; Cui, Yan; Wang, Shuo; Meng, Xiaofeng

    2011-06-01

    Main test processor (MTP) software is the key element of Electrical Ground Support Equipment (EGSE) for spacecraft test and operation used in the Chinese Academy of Space Technology (CAST) for years without innovation. With the increasing demand for a more efficient and agile MTP software, the new MTP software was developed. It adopts layered and plug-in based software architecture, whose core runtime server provides message queue management, share memory management and process management services and forms the framework for a configurable and open architecture system. To investigate the MTP software's performance, the test case of network response time, test sequence management capability and data-processing capability was introduced in detail. Test results show that the MTP software is common and has higher performance than the legacy one.

  18. Developing operating procedures for a low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  19. Knowledge engineering for temporal dependency networks as operations procedures. [in space communication

    Science.gov (United States)

    Fayyad, Kristina E.; Hill, Randall W., Jr.; Wyatt, E. J.

    1993-01-01

    This paper presents a case study of the knowledge engineering process employed to support the Link Monitor and Control Operator Assistant (LMCOA). The LMCOA is a prototype system which automates the configuration, calibration, test, and operation (referred to as precalibration) of the communications, data processing, metric data, antenna, and other equipment used to support space-ground communications with deep space spacecraft in NASA's Deep Space Network (DSN). The primary knowledge base in the LMCOA is the Temporal Dependency Network (TDN), a directed graph which provides a procedural representation of the precalibration operation. The TDN incorporates precedence, temporal, and state constraints and uses several supporting knowledge bases and data bases. The paper provides a brief background on the DSN, and describes the evolution of the TDN and supporting knowledge bases, the process used for knowledge engineering, and an analysis of the successes and problems of the knowledge engineering effort.

  20. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  1. 40 CFR 86.1840-01 - Special test procedures.

    Science.gov (United States)

    2010-07-01

    ... Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Special test procedures. 86.1840-01 Section 86.1840-01 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  2. 20 CFR 416.919m - Diagnostic tests or procedures.

    Science.gov (United States)

    2010-04-01

    ... Section 416.919m Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL SECURITY INCOME FOR THE... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any... responsibility for deciding whether to perform the examination rests with the medical source designated to...

  3. Three Experiments Involving Probability Measurement Procedures with Mathematics Test Items.

    Science.gov (United States)

    Romberg, Thomas A.; And Others

    This is a report from the Project on Individually Guided Mathematics, Phase 2 Analysis of Mathematics Instruction. The report outlines some of the characteristics of probability measurement procedures for scoring objective tests, discusses hypothesized advantages and disadvantages of the methods, and reports the results of three experiments…

  4. 16 CFR 1632.5 - Mattress pad test procedure.

    Science.gov (United States)

    2010-01-01

    ... in § 1632.5(b)(2). (i) Such laundering is not required of mattress pads which are intended for one... regulations established by the Consumer Product Safety Commission in § 1632.31(b). (iii) Exception. One time... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Mattress pad test procedure. 1632.5 Section...

  5. 40 CFR 60.244 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... Fertilizer Industry: Granular Triple Superphosphate Storage Facilities § 60.244 Test methods and procedures... quantities of product are being cured or stored in the facility. (1) Total granular triple superphosphate is at least 10 percent of the building capacity, and (2) Fresh granular triple superphosphate is at...

  6. Testing the applicability of the SASS5 scoring procedure for ...

    African Journals Online (AJOL)

    A study was undertaken between 29th January and 17th February 2004 to test the applicability of the South African Scoring System Version 5 (SASS5) scoring and calculation procedure in nutrient-enriched palustrine wetlands in the midlands of KwaZulu-Natal, South Africa. Four reference wetlands and three dairy-effluent ...

  7. 40 CFR 60.715 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... plant coating formulation data are equivalent to Method 24 results, formulation data may be used. In the... for gas analysis. (f) Method 4 is used for stack gas moisture. (g) Methods 2, 2A, 2C, 2D, 3, and 4... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.715...

  8. Preoperative testing before low-risk surgical procedures

    Science.gov (United States)

    Kirkham, Kyle R.; Wijeysundera, Duminda N.; Pendrith, Ciara; Ng, Ryan; Tu, Jack V.; Laupacis, Andreas; Schull, Michael J.; Levinson, Wendy; Bhatia, R. Sacha

    2015-01-01

    Background: There is concern about increasing utilization of low-value health care services, including preoperative testing for low-risk surgical procedures. We investigated temporal trends, explanatory factors, and institutional and regional variation in the utilization of testing before low-risk procedures. Methods: For this retrospective cohort study, we accessed linked population-based administrative databases from Ontario, Canada. A cohort of 1 546 223 patients 18 years or older underwent a total of 2 224 070 low-risk procedures, including endoscopy and ophthalmologic surgery, from Apr. 1, 2008, to Mar. 31, 2013, at 137 institutions in 14 health regions. We used hierarchical logistic regression models to assess patient- and institution-level factors associated with electrocardiography (ECG), transthoracic echocardiography, cardiac stress test or chest radiography within 60 days before the procedure. Results: Endoscopy, ophthalmologic surgery and other low-risk procedures accounted for 40.1%, 34.2% and 25.7% of procedures, respectively. ECG and chest radiography were conducted before 31.0% (95% confidence interval [CI] 30.9%–31.1%) and 10.8% (95% CI 10.8%–10.8%) of procedures, respectively, whereas the rates of preoperative echocardiography and stress testing were 2.9% (95% CI 2.9%–2.9%) and 2.1% (95% CI 2.1%–2.1%), respectively. Significant variation was present across institutions, with the frequency of preoperative ECG ranging from 3.4% to 88.8%. Receipt of preoperative ECG and radiography were associated with older age (among patients 66–75 years of age, for ECG, adjusted odds ratio [OR] 18.3, 95% CI 17.6–19.0; for radiography, adjusted OR 2.9, 95% CI 2.8–3.0), preoperative anesthesia consultation (for ECG, adjusted OR 8.7, 95% CI 8.5–8.8; for radiography, adjusted OR 2.2, 95% CI 2.1–2.2) and preoperative medical consultation (for ECG, adjusted OR 6.8, 95% CI 6.7–6.9; for radiography, adjusted OR 3.6, 95% CI 3.5–3.6). The median ORs

  9. Test of DEPFET in gated operation

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Felix; Koffmane, Christian; Moser, Hans-Guenther; Ninkovic, Jelena; Richter, Rainer; Andricek, Ladislav; Wassatsch, Andreas [Max-Planck-Institut fuer Physik, Muenchen (Germany)

    2013-07-01

    DEPFET pixel detectors offer excellent signal to noise ratio, resolution and low power consumption with few material. They will be used at Belle II and are a candidate for an ILC vertex detector. Due to the rolling shutter read-out they have integration times in the order of several tens of microseconds which can create problems in applications with temporary high background, for instance during the injection of noisy bunches. In order to overcome this we study a new operation mode which allows a gated or shutter controlled operation of the detector. This makes the detector blind for a certain time interval in which noise is expected whereas the charge of the previous signal will not be removed. Simulations and successful lab- and beam tests with prototype DEPFET PXD6 matrices are presented.

  10. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  11. Validation Testing of Procedures for Determining the Performance of Stand-Alone Photovoltaic Systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; DeBlasio, R.; Lynn, K.; Wilson, W.; Rosenthal, A.; Boulanger, P.

    2000-11-27

    Standard test procedures, ''IEEE P1526/D1 Draft Recommended Practice for Testing the Performance of Stand-Alone Photovoltaic Systems,'' [1] have been developed to assess the performance of stand-alone PV systems tested outdoors under prevailing conditions. A copy of the procedures is included in Appendix E. This report presents an overview of the procedures and results from three validation tests conducted between January 1999 and September 2000 at one European and four US test sites. There was good measurement agreement between the results measured at different test sites on similar systems. To date, most PV system performance test procedures have looked at the performance of the individual components and have not addressed how the integrated system works as a whole. The performance test procedures described in this report verify that the system and load operate as expected, ensure that the PV array and system are capable of recharging the battery, determine the usable battery capacity (UBC), and determine if there is any significant change in the UBC measured three different times during the procedures. The procedures have been submitted to both IEEE SCC21 and IEC TC82 for use in developing standards. The IEEE SCC21 has initiated P1526, ''Recommended Practice for Testing the Performance of Stand-Alone Photovoltaic Systems,'' [1] and the IEC TC82 has initiated Standard 62124, ''Photovoltaic Stand-Alone Systems Design Qualification and Type Approval'' [2]. The IEC document also addresses indoor testing.

  12. Operational test of bonded magnetocaloric plates

    DEFF Research Database (Denmark)

    Bahl, Christian; Navickaité, Kristina; Neves Bez, Henrique

    2017-01-01

    Bonded plates made by hot pressing La0.85Ce0.15Fe11.25Mn0.25Si1.5Hy particles and resin have been tested as active magnetic regenerators in a small scale magnetocaloric device. Firstly the plates were carefully characterised magnetically and thermally. The plates were prepared with 5 wt% resin......, and from density measurements it was found that the volume ratio of the magnetocaloric material in the plates was 0.53, due to the resin and porosity. The best operating conditions for the plate regenerator were determined at which a temperature span of 6.4 K was measured along the plates....

  13. WRAP low level waste (LLW) glovebox operational test report

    Energy Technology Data Exchange (ETDEWEB)

    Kersten, J.K.

    1998-02-19

    The Low Level Waste (LLW) Process Gloveboxes are designed to: receive a 55 gallon drum in an 85 gallon overpack in the Entry glovebox (GBIOI); and open and sort the waste from the 55 gallon drum, place the waste back into drum and relid in the Sorting glovebox (GB 102). In addition, waste which requires further examination is transferred to the LLW RWM Glovebox via the Drath and Schraeder Bagiess Transfer Port (DO-07-201) or sent to the Sample Transfer Port (STC); crush the drum in the Supercompactor glovebox (GB 104); place the resulting puck (along with other pucks) into another 85 gallon overpack in the Exit glovebox (GB 105). The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved from the entry glovebox to the exit glovebox, the Operator will track an items location using a barcode reader and enter any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolution`s (described below) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation.

  14. Operational test for photovoltaic pumping systems; Procedimento para averiguacao operacional de sistemas fotovoltaicos de bombeamento

    Energy Technology Data Exchange (ETDEWEB)

    Fedrizzi, Maria Cristina; Brito, Alaan Ubaiara; Zilles, Roberto [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Lab. de Sistemas Fotovoltaicos], e-mail: fedrizzi@iee.usp.br, e-mail: alaan@iee.usp.br, e-mail: zilles@iee.usp.br

    2004-07-01

    This paper presents an operational test for photovoltaic pumping systems daily production, m{sup 3}/dia. The procedure does not involve expensive instrumentation and is easy to be applied in the field as acceptance and qualification tools. In this way, the paper presents the boundary conditions for operational test accomplishment that allows its application. (author)

  15. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Science.gov (United States)

    2010-07-01

    ....1104 Process vents from continuous unit operations: applicability assessment procedures and methods. (a... from continuous unit operations. The owner or operator of a process vent is not required to determine... process vent from a batch unit operation manifolded with at least one process vent from a continuous unit...

  16. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  17. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    NARCIS (Netherlands)

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training

  18. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  19. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  20. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... Transportation (DOT) drug testing regulation, 49 CFR Part 40, must be collected using chain-of-custody procedures... Alcohol Testing Programs: Federal Drug Testing Custody and Control Form; Technical Amendment AGENCY... Services recently issued a new Federal Drug Testing Custody and Control Form for use in both the Federal...

  1. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    CERN Document Server

    Johns, B R

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  2. Standard operating procedure: implementation, critical analysis, and validation in the Audiology Department at CESTEH/Fiocruz.

    Science.gov (United States)

    Freitas, Anelisse Vasco Mascarenhas de; Quixabeiro, Elinaldo Leite; Luz, Geórgia Rosangela Soares; Franco, Viviane Moreira; Santos, Viviane Fontes Dos

    2016-01-01

    Evaluate three standard operational procedures (SOPs), regarding the application of the brainstem auditory evoked potential (BAEP) test, implemented by the Audiology Department of the Center for Studies in Occupational Health and Human Ecology (CESTEH) through the application of a questionnaire and to verify whether the SOPs are effective and assess the necessity for improvement. The study was conducted in three phases: in the first phase, eight speech-language pathologists and seven physicians, with no experience in BAEP, were instructed to read and perform each SOP, eventually all individuals evaluated the SOPs by responding to a questionnaire; in the second phase, the questionnaires were analyzed and the three SOP texts were reviewed; in the third phase, nine speech-language pathologists and six physicians, also with no experience in BAEP, read and re-evaluated the reviewed SOPs through a questionnaire. In the first phase, difficulties in understanding the texts were found, raising doubts about the procedures; however, every participant was able to perform the procedure as a whole. In the third phase, after the review, all individuals were able to perform the procedures appropriately and continuously without any doubts. The assessment of the SOPs by questionnaires showed the need for adaptation in the texts. After the texts were reviewed according to the suggestions of the health professionals, it was possible to observe that the SOPs assisted in the execution of the task, which was conducted without any difficulties or doubts, being regarded effective and ensuring quality to the service offered.

  3. Test Operations Procedure (TOP) 4-2-013 Commodity Engineering Test Procedures, Recoilless Rifle Ammunition

    Science.gov (United States)

    2009-09-22

    Electromagnetic Interference ( EMI ) ........................................ 69 4.8.5 Hazards of Electromagnetic Radiation to Ordnance (HERO...and ultrasonic examination. The target may have to be sectioned to permit proper measurements to be made. ITOP 2-2-713, Appendix A gives...fuze components or primer may forcibly eject parts. The discharges should be applied remotely, and shielding should be provided to protect personnel

  4. European wind turbine testing procedure developments. Task 2: Power quality

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.; Friis Pedersen, T. [Risoe National Lab., Roskilde (Denmark); Gerdes, G.; Klosse, R.; Santier, F. [DEWI, Wilhelmshaven (Germany); Robertson, N.; Davy, W. [NEL, Glasgow (United Kingdom); Koulouvari, M.; Morfiadakis, E. [CRES, Pikermi (Greece); Larsson, Aa. [Chalmers Univ. of Technology, Goeteborg (Sweden)

    2001-05-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations and provide background for new standards for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of power quality characteristics of grid connected wind turbines. The work has also been based on the power quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been to verify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating partners. The next item has been to investigate the influence of terrain, grid properties and wind farm summation on the power quality of wind turbines, considering both wind turbines with fixed rotor speed(s) and wind turbines with variable speed drives. (au)

  5. Handbook of Data Processing Administration, Operations, and Procedures.

    Science.gov (United States)

    Mixon, Shirley R.

    This book provides a professional and comprehensive approach to solving the problems inherent in computer software development, operations, and maintenance. The information is structured and written so that people with varying experience in data processing can benefit from it. It is intended for executives whose activities interrelate with data…

  6. Procedures Manual for Home School Operators in New Mexico

    Science.gov (United States)

    New Mexico Public Education Department, 2007

    2007-01-01

    Under the New Mexico Public School Code, the right of parents to home-school their children is recognized. "Home School" is defined as the operation by a parent, legal guardian, or other person having custody of a school-age person who instructs a home study program that provides a basic academic educational program, including but not…

  7. Systematic Procedure for Integrated Process Operation: Reverse Electro-Enhanced Dialysis (REED) during Lactic Acid Fermentation

    DEFF Research Database (Denmark)

    Prado Rubio, Oscar Andres; Jørgensen, Sten Bay; Jonsson, Gunnar Eigil

    2011-01-01

    integration shows the need for an additional pH controller in the fermenten A PI controller is implemented and tested. The complete control structure for the integrated system consists of this PI controller in the fermenter plus a previously developed (Prado-Rubio et al., 2010) input resetting control......The integration of lactic acid fermentation and Reverse Electro-Enhanced Dialysis (REED) is investigated based upon previously developed mathematical models. A goal driven process and operation design procedure is proposed and partially investigated. The conceptual analysis of the processes...... structure in the REED module. The integrated system design and operation is investigated through batch production of a starter culture. Substantial productivity improvements are predicted using the REED process compared to other systems. Insights are obtained for improving the integrated design...

  8. DOT-7A Type A packaging test and evaluation procedure

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, D.L., Westinghouse Hanford

    1996-06-13

    The purpose of this document is to provide guidance for qualifying a DOT-7A Type A packaging for use. WHC qualifies DOT-7A packaging for two purposes. The first is to provide packages for use by WHC (manufacturer-qualified). The second is to provide a contracted service in support of DOE/EM-76 (DOE-qualified). This document includes descriptions of the performance tests, the personnel involved and their qualifications, appropriate safety and quality assurance considerations, and the procedures to be followed when WHC performs the tests (either as the manufacturer, or on behalf of the DOE`s certification program).

  9. Hydrogen-Rated System for in Vitro Studies at Pressure: Operating Procedures and Emergency Procedures

    Science.gov (United States)

    1993-03-01

    valve is seated, prior to switch to hydrox. Anticipate mix gas switches during travel: Switch to 2% heliox or trimix at 230 FSW (Procedure 6A...747 111 781 117 817 9 124 19 855 131 894 138 935 146 978 E-3 Compression profile for synaptosomes to 64 ATA (2079 FSW) (hydrox and trimix study) time

  10. 40 CFR 265.1034 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... -possible as described in Reference Method 21. (7) The arithmetic difference between the maximum... information as may be necessary to determine the conditions of the performance tests. Operations during... and the mean organic concentration of each waste stream managed in the unit. (2) Using knowledge of...

  11. 40 CFR 264.1034 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... described in Reference -Method 21. (7) The arithmetic difference between the maximum concentration indicated... information as may be necessary to determine the conditions of the performance tests. Operations during... and the mean organic concentration of each waste stream managed in the unit. (2) Using knowledge of...

  12. Tableau-based decision procedure for the multiagent epistemic logic with all coalitional operators for common and distributed knowledge

    DEFF Research Database (Denmark)

    Ajspur, Mai; Goranko, Valentin; Shkatov, Dmitry

    2013-01-01

    We develop a conceptually clear, intuitive and feasible decision procedure for testing satisfiability in the full multiagent epistemic logic CMAEL(CD) with operators for common and distributed knowledge for all coalitions of agents mentioned in the language. To that end, we introduce Hintikka...

  13. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  14. Testing heated flint palaeodose protocols using dose recovery procedures

    Energy Technology Data Exchange (ETDEWEB)

    Richter, D. [Max Planck Institute for Evolutionary Anthropology, Department of Human Evolution, Deutscher Platz 6, 04103 Leipzig (Germany)]. E-mail: drichter@eva.mpg.de; Temming, H. [Max Planck Institute for Evolutionary Anthropology, Department of Human Evolution, Deutscher Platz 6, 04103 Leipzig (Germany)

    2006-08-15

    Thermoluminescence (TL) dating of materials from archaeological contexts has been shown to be an accurate method when comparisons are made with other chronometric dating methods; however, little has been published on the verification of the measurement protocols used to determine the equivalent dose (palaeodose). Instead of testing TL dating protocols for heated flint using archaeological material with unknown thermal and radiation history, dose recovery tests for three samples of different geological origin are presented. These samples exhibit TL emission in the UV, blue and orange-red wavelengths. In addition to the two multiple aliquot protocols (standard additive-regeneration and normalization) generally used to determine the palaeodose, the single-aliquot-regenerative-dose (SAR) TL and OSL procedure, a 'short' SAR-TL and isothermal luminescence (IT) decay procedures are applied using detection windows limited to these emissions. Accurate dose recovery is obtained for the standard and normalization protocols in the commonly employed detection window (UV-blue), the 'short' SAR in the orange-red window and some IT measurements. While the standard techniques give the most accurate and precise results, detection of the TL and IT orange-red emission in connection with a 'short' SAR protocol also gave accurate and precise results. Such procedures are especially suitable for samples too small for standard multiple aliquot techniques, which require large samples.

  15. Field operational tests of Smartway in Japan

    Directory of Open Access Journals (Sweden)

    Fumihiko Kanazawa

    2010-07-01

    Full Text Available Efforts are underway in Japan to promote “Smartway” next-generation roadways, which provide a variety of services through the use of advanced ITS technologies. In recent years, the National Institute for Land and Infrastructure Management (NILIM, part of the Ministry of Land, Infrastructure, Transport and Tourism (MLIT, has conducted public–private joint research on next-generation road services using ITS technologies. Field operational tests (FOTs of services including forward obstacle information provision and merging assistance using 5.8 GHz dedicated short range communication (DSRC were conducted on the Tokyo Metropolitan Expressway through FY2007. In FY2008–2009, FOTs were conducted in three major metropolitan areas—Tokyo, Nagoya, and Keihanshin (Kyoto, Osaka, and Kobe—to promote future deployment nationwide. These included tests of information provision services to alert drivers to forward obstacles hidden beyond the crest of an incline and prevent excessive speed on sharp curves. This paper presents an overview of these FOTs conducted by NILIM in recent years and their results.

  16. Video Automatic Target Tracking System (VATTS) Operating Procedure,

    Science.gov (United States)

    1980-08-15

    AO-AIO𔃾 790 BOM CORP MCLEAN VA F/A 17/8 VIDEO AUTOMATIC TARGE T TRACKING SYSTEM (VATTS) OPERATING PROCEO -ETC(U) AUG Go C STAMM J P ORRESTER, J...Tape Transport Number Two TKI Tektronics I/0 Terminal DS1 Removable Disk Storage Unit DSO Fixed Disk Storage Unit CRT Cathode Ray Tube 1-3 THE BDM...file (mark on Mag Tape) AZEL Quick look at Trial Information Program DUPTAPE Allows for duplication of magnetic tapes CA Cancel ( terminates program on

  17. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    Energy Technology Data Exchange (ETDEWEB)

    Tuohig, W. (Honeywell FM& T, Kansas City, MO); Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  18. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... maintenance activities and for emergency response. For transmission lines, the manual must also include... control room management procedures required by § 192.631. (c) Abnormal operation. For transmission lines... gas distribution operators that are operating transmission lines in connection with their distribution...

  19. Reverberation Chamber Uniformity Validation and Radiated Susceptibility Test Procedures for the NASA High Intensity Radiated Fields Laboratory

    Science.gov (United States)

    Koppen, Sandra V.; Nguyen, Truong X.; Mielnik, John J.

    2010-01-01

    The NASA Langley Research Center's High Intensity Radiated Fields Laboratory has developed a capability based on the RTCA/DO-160F Section 20 guidelines for radiated electromagnetic susceptibility testing in reverberation chambers. Phase 1 of the test procedure utilizes mode-tuned stirrer techniques and E-field probe measurements to validate chamber uniformity, determines chamber loading effects, and defines a radiated susceptibility test process. The test procedure is segmented into numbered operations that are largely software controlled. This document is intended as a laboratory test reference and includes diagrams of test setups, equipment lists, as well as test results and analysis. Phase 2 of development is discussed.

  20. Development of use of an Operational Procedure Information System (OPIS) for future space missions

    Science.gov (United States)

    Illmer, N.; Mies, L.; Schoen, A.; Jain, A.

    1994-01-01

    A MS-Windows based electronic procedure system, called OPIS (Operational Procedure Information System), was developed. The system consists of two parts, the editor, for 'writing' the procedure and the notepad application, for the usage of the procedures by the crew during training and flight. The system is based on standardized, structured procedure format and language. It allows the embedding of sketches, photos, animated graphics and video sequences and the access to off-nominal procedures by linkage to an appropriate database. The system facilitates the work with procedures of different degrees of detail, depending on the training status of the crew. The development of a 'language module' for the automatic translation of the procedures, for example into Russian, is planned.

  1. OPERATING PROCEDURE FOR THE PORTABLE ACOUSTIC MONITORING PACKAGE (PAMP)

    Energy Technology Data Exchange (ETDEWEB)

    John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Patrick Browning

    2004-08-29

    The Portable Acoustic Monitoring Package (PAMP) has been designed to record and monitor acoustic signals in high-pressure natural gas (NG) transmission lines. Of particular interest are the three acoustic signals associated with a pipeline fracture. The system is portable (less than 30 lbm) and can be used at all line pressures up to 1000 psig. The PAMP requires a shut-off valve equipped 1/2 inch NPT access port in the pipeline. It is fully functional over the typical pressure range found in the natural gas transmission pipelines in the West Virginia, Virginia, Pennsylvania, and Ohio areas. With the use of the PAMP, a full spectrum of acoustic signals can be recorded and defined in terms of acoustic energy in decibels. To detect natural gas pipeline infringements and leaks, the acoustic energy generated inside the line is monitored with a sensitive pressure-equalized microphone and a step function type {Delta}p transducer. The assembly is mounted on a 1000 psig pipe fitting-tree called the PAMP. The electronics required to record, store and analyze the data are described within this report in the format of an operating manual.

  2. Ultra high temperature diffusion apparatus and operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Wyrick, S.B.

    1985-11-15

    It is the purpose of this paper to present an experimental apparatus which is capable of measuring diffusion coefficients of interdiffusing gases in the temperature range 300K to 2500K. Because of the high temperatures which will be encountered, a special alloy of tantalum (T-111) is used to house the diffusion process. This T-111 diffusion cell is heated via radiation heat from a tungsten heating element powered by a Saban saturable reactor power supply. The diffusion cell heating element are encased in a nickel-plated copper cooling can. This entire assembly is enclosed in an Ultek vacuum chamber to prevent oxidation of the diffusion cell. This report covers the construction and calibration of the diffusion cell, details of the gas loading and sampling system, and complete information on the components required to operate the vacuum furnace. Thus far, several experiments have been run in the temperature range 600K to 800K and the resulting diffusion coefficients agree fairly well with previously published values. 21 refs., 9 figs., 4 tabs.

  3. STUDY ON PROCEDURES FOR OPERATIONAL OBJECTIVES IN PHYSICAL EDUCATION

    Directory of Open Access Journals (Sweden)

    Cojanu Florin

    2009-03-01

    Full Text Available INTRODUCTIONIn general, educational goals and / or instructional purposes are pursued by the processes of education orteaching activities, such as learning skills and ability to drive the development of cognitive skills (understanding,application, analysis, synthesis emotional (reactions, feelings , will, perseverance, inclinations psihomotric(collection, disposal, automatism, etc. driven side. growing health training driving skills, etc. ..They are a target or purpose teaching subjects to be conducted systematically and rigorously the process ofconducting training or other education-training activities of the human personality.Specifying the correct targets is a fundamental requirement of designing teaching activities. Specifying theobjectives of education, training, information, etc., is achieved through logical operations or judgments,subsidized by the correct and precise answers to four fundamental questions, as follows:1. "What we want to do? 2.2. "What we know and will know what to do?" (Student at the end of one or more units of learning(training assembled systemic3. 3. "What use what you learn, educate, dial"4. 4. "What length of time is required?"Any type of project is being developed "from the end", with the thought and image of the final product youwant to realize it. This purpose may be placed at the end of a cycle of learning (school, school, university.These types of targets determine the contents of various analytical programs of instruction (for the recoveryof knowledge, ownership of new acquisitions and continuous improvement. Largely from physical educationlessons are devoid of quality and efficiency expected, due to errors that are committed in the methodology ofdetermining educational objectives-training or instruction.

  4. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power......The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... partners. The next item has been to investigate the influence of terrain, grid properties and windfarm summation on the power quality of wind turbines, considering both wind turbines with fixed rotor speed(s) and wind turbines with variable speed drives....

  5. US EPA Base Study Standard Operating Procedure for Data Processing and Data Management

    Science.gov (United States)

    The purpose of the Standard Operating Procedures (SOP) for data management and data processing is to facilitate consistent documentation and completion of data processing duties and management responsibilities in order to maintain a high standard of data quality.

  6. Development of a standard operating procedure for analysis of ammonia concentrations in coal fly ash.

    Science.gov (United States)

    2015-04-01

    Research was performed to support the development and recommendation of a standard operating : procedure (SOP) for analyzing the ammonia content in fly ash intended for use in concrete. A review : of existing ash producers found that several differen...

  7. 76 FR 54528 - Standard Operating Procedures (SOP) of the Aircraft Certification Service (AIR) Process for the...

    Science.gov (United States)

    2011-09-01

    ... supporting our safety mission to meet certification commitments. A means to manage resources such that... Federal Aviation Administration Standard Operating Procedures (SOP) of the Aircraft Certification Service (AIR) Process for the Sequencing of Certification and Validation Projects AGENCY: Federal Aviation...

  8. Hand washing in operating room: a procedural comparison

    Directory of Open Access Journals (Sweden)

    Alessia Stilo

    2016-09-01

    Full Text Available BACKGROUND Hand washing has been considered a measure of personal hygiene for centuries and it is known that an improper hand hygiene by healthcare workers is responsible for about 40% of nosocomial infections. Therefore, surgical hand preparation is a critical element for healthcare safety in order to reduce microbial contamination of  surgical wound in case of non detected break of the gloves. The aim of our study is to evaluate the efficacy three antiseptics: Povi-iodine scrub; EPG (Ethanol, Hydrogen Peroxide, Glycerol, recommended by WHO, and common marseille soap type in a liquid formulation. METHODS It was designed a randomized, double-blind, single-center study conducted in the University Hospital of Messina, from January to June 2013. We asked operators to put the fingertips of their right hand (if not left-handed for one minute on the PCA medium, before washing with the three types of antiseptics, and after washing and drying. Drying was made using sterile gauzes or disposable wipes. Then, we measured the number of colony forming units per mL (CFU/mL and calculated the percentage of microbial load reduction. RESULTS 211 samples have been considered for statistical analysis: in 42 samples, in fact, initial microbial load was lower than after washing. Washing with EPG reduced CFU/ml from  a mean of 38,9 to 4,1 (86,5% reduction, washing with povi-iodine scrub from 59,55 to 12,9 (75,9% reduction and washing with Marseille soap from 47,26 to 12,7 (64,3% reduction. CONCLUSIONS Our study shows that washing with EPG has superior efficacy in CFU reduction. Antiseptic hand washing, however, cannot be considered the only measure to reduce infections: the anomaly of some results (initial microbial load lower than after washing  demonstrates that drying is an essential phase in the presurgical preparation. Therefore, hand hygiene must be part of a more complex strategy of surveillance and control of nosocomial infections

  9. 33 CFR 159.119 - Operability test; temperature range.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Operability test; temperature... Operability test; temperature range. The device must operate in an ambient temperature of 5 °C with inlet operating fluid temperature varying from 2 °C to 32 °C and in an ambient temperature of 50 °C with inlet...

  10. Towards a standardized reference point indentation testing procedure.

    Science.gov (United States)

    Setters, Alexander; Jasiuk, Iwona

    2014-06-01

    We study the reference point indentation (RPI) technique which has a potential to directly measure mechanical properties of bone in patients. More specifically, we tested 6 month swine femoral cortical bone at mid-diaphysis region to investigate the effect of several testing variables on the RPI outputs. They include the force magnitude, preconditioning, variation within a sample and between samples, number of cycles, indentation surface (transverse versus longitudinal, polished versus unpolished), and micro-computed tomography radiation exposure. The force magnitude variation test shows that all RPI parameters increase linearly with the increasing force magnitude except the indentation distance increase which shows a cubic trend with a plateau for force magnitudes between 4N and 8N. Preconditioning does not affect the trends for a force magnitude variation test. The cycle variation test shows that most RPI parameters reach either a maximum or minimum at 15-20 cycles. Transverse surface measurements are more consistent than the longitudinal surface measurements, but a rough surface and periosteum on the longitudinal surface could account for this difference. Exposure to the micro-computed tomography radiation in general does not have effect on the RPI measurements. For the 6 month swine femoral cortical bone, testing using 6N force and 20 cycles with preconditioning on an unpolished longitudinal surface is recommended. This study advances our knowledge on how the RPI testing variables influence the RPI outputs and provides guidance on the RPI measurements. It may also serve as a framework for developing a standardized testing procedure for the RPI technique. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. 40 CFR 86.1439 - Certification Short Test emission test procedures-EPA.

    Science.gov (United States)

    2010-07-01

    ... not satisfied by an elapsed time of 90 seconds (mt=90). (f) CST—Preconditioned two-speed idle test... paragraph (f)(1)(ii)(A) of this section are not satisfied by an elapsed time of 90 seconds (mt=90). (2) Idle... Administrator selects from among the CST emission test procedures listed in paragraphs (b) through (f) of this...

  12. 40 CFR 53.63 - Test procedure: Wind tunnel inlet aspiration test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Wind tunnel inlet... extracts an ambient aerosol at elevated wind speeds. This wind tunnel test uses a single-sized, liquid... this subpart (under the heading of “wind tunnel inlet aspiration test”). The candidate sampler must...

  13. Guidelines for the preparation of emergency operating procedures. Resolution of comments on NUREG-0799

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-01

    The purpose of this document is to identify the elements necessary for utilities to prepare and implement a program of Emergency Operating Procedures (EOPs) for use by control room personnel to assist in mitigating the consequences of a broad range of accidents and multiple equipment failures. This document applies only to the EOPs so designated; it does not address emergency preparedness or emergency planning. It also represents the resolution of comments on NUREG-0799, Draft Criteria for Preparation of Emergency Operating Procedures.

  14. Oak Ridge National Laboratory whole-body counter: internal operating procedure manual

    Energy Technology Data Exchange (ETDEWEB)

    Berger, C.D.; Lane, B.H.

    1982-08-01

    The general purpose of the ORNL Whole Body Counter is to provide a rapid estimation of the type and quantity of radionuclide deposited in the human body. This report contains a review of the equipment in use at the facility and the procedure for its operation, the standard procedure for performing a routine whole body count, and a discussion of interpretation of results.

  15. An operant procedure for improving vocabulary definition performances in developmentally delayed children.

    Science.gov (United States)

    Cottrell, A W; Montague, J; Farb, J; Throne, J M

    1980-02-01

    This report describes a training program in which operant procedures were used to improve the identification and definition of selected vocabulary words in three developmentally delayed children. Generalization from the training words was well established, as determined by responses to untrained vocabulary performance words. The results of this procedure suggest its application with other developmentally delayed children.

  16. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  17. 42 CFR 84.98 - Tests during low temperature operation.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Tests during low temperature operation. 84.98...-Contained Breathing Apparatus § 84.98 Tests during low temperature operation. (a) The applicant shall specify the minimum temperature for safe operation and two persons will perform the tests described in...

  18. 40 CFR 86.165-12 - Air conditioning idle test procedure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Air conditioning idle test procedure... Complete Heavy-Duty Vehicles; Test Procedures § 86.165-12 Air conditioning idle test procedure. (a) Applicability. This section describes procedures for determining air conditioning-related CO2 emissions from...

  19. ESO Successfully Tests Automation of Telescope Operations

    Science.gov (United States)

    1997-02-01

    referred to as the VLT Data Flow System , now being perfected by the ESO Data Management Division for use on ESO's Very Large Telescope project. First tests at the NTT On February 5, a team of software engineers and astronomers from ESO used a first version of the new VLT Data Flow System to perform observations on ESO's New Technology Telescope (NTT) at the La Silla Observatory in Chile. A computer file containing a complete description of an observation (for instance, object position in the sky, filtres and exposure time, and other relevant information) prepared in advance by an astronomer was transferred via the satellite link from the ESO Headquarters in Germany to the NTT computers at La Silla and executed on the control system of the telescope. The telescope then moved to the correct position in the sky, the camera was activated and a few minutes later, a processed image a distant galaxy appeared on the screen in front of the observers. The image was saved in an automatic archive system that writes the astronomical data on CD-ROM. The entire process took place automatically and demonstrated that this system is capable of taking high quality data from the sky at the best possible time and delivering the results to the astronomer, efficiently and in the most convenient form. Further developments This is the first time that a ground-based telescope has been operated under the new system. This successful initial test bodes well for the start-up of the VLT. During 1997, ESO will further develop the data flow system in preparation for the beginning of commissioning of the first VLT 8.2-metre unit, less then 12 months from now. How to obtain ESO Press Information ESO Press Information is made available on the World-Wide Web (URL: http://www.eso.org../). ESO Press Photos may be reproduced, if credit is given to the European Southern Observatory.

  20. New operating procedures for joining trains; Vereinigen von Zuegen mittels neuer Betriebsverfahren

    Energy Technology Data Exchange (ETDEWEB)

    Homeyer, Dietmar [DB Netz AG, Frankfurt am Main (DE). Betriebsverfahren (I.NPB 4); Walf, Fabian [Deutsche Bahn AG (DE). Strategie Infrastruktur (GSt)

    2009-07-01

    To date, the procedure for joining trains in the DB Netz infrastructure has largely been based on the concept of a transition from a train run with halt to a shunting run. For operational reasons this is a very time-consuming approach, as well as complicated in signalling terms, and as such is often inconsistent with traffic-related and other operational requirements. To remedy this, two new operating procedures have been developed. Particularly promising is procedure (4), called ''ZoH'', which allows for entry into an occupied track as a train run without a home stop signal and without transition to a shunting run. This procedure has been successfully piloted and thus looks set to become the standard solution in the medium term. (orig.)

  1. A Guide for Developing Standard Operating Job Procedures for the Pump Station Process Wastewater Treatment Facility. SOJP No. 3.

    Science.gov (United States)

    Perley, Gordon F.

    This is a guide for standard operating job procedures for the pump station process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up procedures, continuous routine operation procedures, and shut-down procedures. A general description of the equipment used in the process is given. Two…

  2. Shuttle Operational Test and Scientific Investigations

    Science.gov (United States)

    Stonesifer, J. C.

    1985-01-01

    The Detailed Test Objectives (DTOs) originated as a test or measurement made to verify the function of a vehicle system for certification of a vehicle system. The Detailed Supplementary Objectives (DSOs) are a demonstration or test which has a lower priority than a DTO. The criteria for inclusion on space shuttle mission is discussed.

  3. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs.

  4. EVALUASI SANITATION STANDARD OPERATING PROCEDURES KERUPUKAMPLANG DI UD SARINA KECAMATAN KALIANGET KABUPATEN SUMENEP

    Directory of Open Access Journals (Sweden)

    Ach Triharjono

    2016-11-01

    Full Text Available Industri pangan untuk menghasilkan produk yang memenuhi standar keamanan pangan. Standar tersebut dapat dipenuhi dengan menerapkan 8 aspek kunci Sanitation Standard Operating Prosedures (SSOP. Tujuan dari penelitian ini adalah untuk memperoleh hasil penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP dan mengevaluasi penerapan Sanitation Standard Operating Procedures (SSOP Di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Jenis penelitian ini bersifat deskriptif dengan lokasi penelitian di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Hasil penelitian diketahui bahwa penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP di UD Sarina sudah terlaksana tapi terdapat 3 tahapan kunci yang belum terlaksana dengan baik yaitu pencegahan kontaminasi silang, pengawasan kondisi kesehatan personil dan menghilangkan hama dari unit pengolahan. Hal yang perlu ditingkatkan terkait dengan penerapan SSOP di UD Sarina yaitu masih perlu adanya manual prosedur untuk berbagai pelaksanaan sanitasi yang dilakukan oleh UD Sarina ini

  5. Automated Kick Control Procedure for an Influx in Managed Pressure Drilling Operations

    Directory of Open Access Journals (Sweden)

    Jing Zhou

    2016-01-01

    Full Text Available Within drilling of oil and gas wells, the Managed Pressure Drilling (MPD method with active control of wellbore pressure during drilling has partly evolved from conventional well control procedures. However, for MPD operations the instrumentation is typically more extensive compared to conventional drilling. Despite this, any influx of formation fluids (commonly known as a kick during MPD operations is typically handled by conventional well control methods, at least if the kick is estimated to be larger than a threshold value. Conventional well control procedures rely on manual control of the blow out preventer, pumps, and choke valves and do not capitalize on the benefits from the instrumentation level associated with MPD. This paper investigates two alternative well control procedures specially adapted to backpressure MPD: the dynamic shut-in (DSI procedure and the automatic kick control (AKC procedure. Both methods capitalize on improvements in Pressure While Drilling (PWD technology. A commercially available PWD tool buffers high-resolution pressure measurements, which can be used in an automated well control procedure. By using backpressure MPD, the choke valve opening is tuned automatically using a feedback-feedforward control method. The two procedures are evaluated using a high fidelity well flow model and cases from a North Sea drilling operation are simulated. The results show that using AKC procedure reduces the time needed to establish control of the well compared to DSI procedure. It also indicates that the AKC procedure reduces the total kick size compared to the DSI procedure, and thereby reduces the risk of lost circulation.

  6. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures and... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  7. Field Laboratory in the Osage Reservation -- Determination of the Status of Oil and Gas Operations: Task 1. Development of Survey Procedures and Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, Herbert B.; Johnson, William I.

    1999-04-27

    Procedures and protocols were developed for the determination of the status of oil, gas, and other mineral operations on the Osage Mineral Reservation Estate. The strategy for surveying Osage County, Oklahoma, was developed and then tested in the field. Two Osage Tribal Council members and two Native American college students (who are members of the Osage Tribe) were trained in the field as a test of the procedures and protocols developed in Task 1. Active and inactive surface mining operations, industrial sites, and hydrocarbon-producing fields were located on maps of the county, which was divided into four more or less equal areas for future investigation. Field testing of the procedures, protocols, and training was successful. No significant damage was found at petroleum production operations in a relatively new production operation and in a mature waterflood operation.

  8. A method for risk informing procedures at operating nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, P. F.; Martin del Campo, C., E-mail: pnelson_007@yahoo.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac No. 8532, Col. Progreso, 62550 Jiutepec, Morelos (Mexico)

    2012-10-15

    The technical approach presented establishes a framework intended to provide the necessary elements for a deployable human performance monitoring program that incorporates insights from plant specific probabilistic risk assessments, human reliability analysis, as well as the development of plant specific human failure data. A human performance monitoring program of this structure would be used to provide the ability to risk inform procedures (e.g., operations or maintenance) to determine the operational risk significance of procedural performance (i.e., precautions, prerequisites, procedure steps), the likelihood of consequential human error dur the performance of the procedure, and the identification of procedure specific barriers to reduce or eliminate consequential human errors. The program would provide the means to assess procedures prior to execution and the means to record and trend human failure events leading to a plant specific human failure database for human activities characterized as pre-initiator. The technical methods and data processing for each of these areas are developed and presented, as well as an example application of an operational procedure error leading to a plant level event (i.e, plant trip). (Author)

  9. Improving the safety and quality of nursing care through standardized operating procedures in Bosnia and Herzegovina.

    Science.gov (United States)

    Ausserhofer, Dietmar; Rakic, Severin; Novo, Ahmed; Dropic, Emira; Fisekovic, Eldin; Sredic, Ana; Van Malderen, Greet

    2016-06-01

    We explored how selected 'positive deviant' healthcare facilities in Bosnia and Herzegovina approach the continuous development, adaptation, implementation, monitoring and evaluation of nursing-related standard operating procedures. Standardized nursing care is internationally recognized as a critical element of safe, high-quality health care; yet very little research has examined one of its key instruments: nursing-related standard operating procedures. Despite variability in Bosnia and Herzegovina's healthcare and nursing care quality, we assumed that some healthcare facilities would have developed effective strategies to elevate nursing quality and safety through the use of standard operating procedures. Guided by the 'positive deviance' approach, we used a multiple-case study design to examine a criterion sample of four facilities (two primary healthcare centres and two hospitals), collecting data via focus groups and individual interviews. In each studied facility, certification/accreditation processes were crucial to the initiation of continuous development, adaptation, implementation, monitoring and evaluation of nursing-related SOPs. In one hospital and one primary healthcare centre, nurses working in advanced roles (i.e. quality coordinators) were responsible for developing and implementing nursing-related standard operating procedures. Across the four studied institutions, we identified a consistent approach to standard operating procedures-related processes. The certification/accreditation process is enabling necessary changes in institutions' organizational cultures, empowering nurses to take on advanced roles in improving the safety and quality of nursing care. Standardizing nursing procedures is key to improve the safety and quality of nursing care. Nursing and Health Policy are needed in Bosnia and Herzegovina to establish a functioning institutional framework, including regulatory bodies, educational systems for developing nurses' capacities or the

  10. Operational Test Director Guide. Change 4.

    Science.gov (United States)

    1982-09-20

    to the danger , you can make the same error. Don’t let your tech- nical background smother your operational background. Confronted with a new weapons...PR1ESNAVWARCOL CO, SWOSCOLSCOM CNET CNA C0OMFLETRAGRU GTI4O CO, FLETRAU LCREEK DTIC (2) (ALtva 4 Lait on thiA pa~t o6 the dihtxibutiZon SCopy to (w/o enclosure (1

  11. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  12. Practicability of passenger vehicle driving emission tests according to new European Union procedures

    Directory of Open Access Journals (Sweden)

    Pielecha Jacek

    2017-01-01

    Full Text Available The article compares driving test data using the latest legislative proposals applicable to passenger cars. Several measurements were performed on the same test route in accordance with the RDE test guidelines, which requires a number of criteria to be met. These criteria include: the length of the measuring segments, their overall test time share, and the dynamic characteristics of the drive. A mobile device for reading the EOBD System information was used to record the engine and vehicle operating parameters during tests. This allowed for the monitoring of parameters such as: load value, engine speed and vehicle velocity. The obtained results were then analyzed for their compatibility with the RDE procedure requirements. Despite the same research route, the obtained results were not the same. The analysis also uses the two-dimensional operating time share characteristics expressed in vehicle velocity and acceleration co-ordinates. As a result it was possible to compare the dynamic properties, share of operating time and, consequently, to check the validity of conducted drive tests in terms of their practicability and emission values.

  13. Orion Pad Abort 1 Flight Test - Ground and Flight Operations

    Science.gov (United States)

    Hackenbergy, Davis L.; Hicks, Wayne

    2011-01-01

    This paper discusses the ground and flight operations aspects to the Pad Abort 1 launch. The paper details the processes used to plan all operations. The paper then discussions the difficulties of integration and testing, while detailing some of the lessons learned throughout the entire launch campaign. Flight operational aspects of the launc are covered in order to provide the listener with the full suite of operational issues encountered in preparation for the first flight test of the Orion Launch Abort System.

  14. Powertrain Test Procedure Development for EPA GHG Certification of Medium- and Heavy-Duty Engines and Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Chambon, Paul H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deter, Dean D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-07-01

    xiii ABSTRACT The goal of this project is to develop and evaluate powertrain test procedures that can accurately simulate real-world operating conditions, and to determine greenhouse gas (GHG) emissions of advanced medium- and heavy-duty engine and vehicle technologies. ORNL used their Vehicle System Integration Laboratory to evaluate test procedures on a stand-alone engine as well as two powertrains. Those components where subjected to various drive cycles and vehicle conditions to evaluate the validity of the results over a broad range of test conditions. Overall, more than 1000 tests were performed. The data are compiled and analyzed in this report.

  15. SRS Software Verification Pre Operational and Startup Test

    Energy Technology Data Exchange (ETDEWEB)

    HILL, L.F.

    2000-10-18

    This document defines testing for the software used to control the Sodium Removal System (SRS). The testing is conducted off-line from the. physical plant by using a simulator built-in to the software. This provides verification of proper software operation prior to performing the operational acceptance tests with the actual plant hardware.

  16. Description and operating procedure for magma characterization data acquisition and control system

    Energy Technology Data Exchange (ETDEWEB)

    Woodward, M H

    1982-04-01

    A computerized data acquisition and control system used in a Sandia National Laboratories' facility for molten rock (magma) and metallurgical pressure bonding experiments is described. The system is based on a Hewlett-Packard 9826A Desktop Computer and a Hewlett-Packard 3497A Data Acquisition/Control Unit. Operating procedures are included, and detailed instructions for implementing the procedures are given.

  17. Radiation dose of nurses during IR procedures: a controlled trial evaluating operator alerts before nursing tasks.

    Science.gov (United States)

    Komemushi, Atsushi; Suzuki, Satoshi; Sano, Akira; Kanno, Shohei; Kariya, Shuji; Nakatani, Miyuki; Yoshida, Rie; Kono, Yumiko; Ikeda, Koshi; Utsunomiya, Keita; Harima, Yoko; Komemushi, Sadao; Tanigawa, Noboru

    2014-08-01

    To compare radiation exposure of nurses when performing nursing tasks associated with interventional procedures depending on whether or not the nurses called out to the operator before approaching the patient. In a prospective study, 93 interventional radiology procedures were randomly divided into a call group and a no-call group; there were 50 procedures in the call group and 43 procedures in the no-call group. Two monitoring badges were used to calculate effective dose of nurses. In the call group, the nurse first told the operator she was going to approach the patient each time she was about to do so. In the no-call group, the nurse did not say anything to the operator when she was about to approach the patient. In all the nursing tasks, the equivalent dose at the umbilical level inside the lead apron was below the detectable limit. The equivalent dose at the sternal level outside the lead apron was 0.16 μSv ± 0.41 per procedure in the call group and 0.51 μSv ± 1.17 per procedure in the no-call group. The effective dose was 0.018 μSv ± 0.04 per procedure in the call group and 0.056 μSv ± 0.129 per procedure in the no-call group. The call group had a significantly lower radiation dose (P = .034). Radiation doses of nurses were lower in the group in which the nurse called to the operator before she approached the patient. Copyright © 2014 SIR. Published by Elsevier Inc. All rights reserved.

  18. Design and evaluation of computerized operating procedures in nuclear power plants.

    Science.gov (United States)

    Hwang, Fei-Hui; Hwang, Sheue-Ling

    2003-01-15

    A small-scale virtual system has been developed in this study to enhance operators' understanding and operating performance. For this, a computerized graphical interface based on Dynamic Work Causality Equation (DWCE) has been designed to transform the operating procedure into a flowchart. Furthermore, the Programmable Logic Controller (PLC) was installed to connect the signboard (proposed system) with the computerized graphical interface. An experiment was conducted to verify the effect of computerized graphic interface, indicating that the computerized system significantly decreases learning time and improves operational performance.

  19. Towards Verification of Operational Procedures Using Auto-Generated Diagnostic Trees

    Science.gov (United States)

    Kurtoglu, Tolga; Lutz, Robyn; Patterson-Hine, Ann

    2009-01-01

    The design, development, and operation of complex space, lunar and planetary exploration systems require the development of general procedures that describe a detailed set of instructions capturing how mission tasks are performed. For both crewed and uncrewed NASA systems, mission safety and the accomplishment of the scientific mission objectives are highly dependent on the correctness of procedures. In this paper, we describe how to use the auto-generated diagnostic trees from existing diagnostic models to improve the verification of standard operating procedures. Specifically, we introduce a systematic method, namely the Diagnostic Tree for Verification (DTV), developed with the goal of leveraging the information contained within auto-generated diagnostic trees in order to check the correctness of procedures, to streamline the procedures in terms of reducing the number of steps or use of resources in them, and to propose alternative procedural steps adaptive to changing operational conditions. The application of the DTV method to a spacecraft electrical power system shows the feasibility of the approach and its range of capabilities

  20. 78 FR 41265 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces and...

    Science.gov (United States)

    2013-07-10

    ... full-fuel cycle as part of the residential furnace and boiler test procedure. (APGA, No. 7 at p. 1... Part 430 RIN 1904-AC96 Energy Conservation Program for Consumer Products: Test Procedures for... notice of proposed rulemaking (NOPR) to amend its test procedure for residential furnaces and boilers...

  1. 75 FR 14287 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-03-24

    ... Energy 10 CFR Part 430 Energy Conservation Program: Test Procedures and Standards for Fluorescent Lamp... OF ENERGY 10 CFR Part 430 RIN 1904-AB99 Energy Conservation Program: Test Procedures for Fluorescent... major revisions to its test procedures for fluorescent lamp ballasts established under the Energy Policy...

  2. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  3. Impact of Technique-Specific Operative Videos on First-Year Dental Students' Performance of Restorative Procedures.

    Science.gov (United States)

    Patel, Shalizeh A; Barros, Juliana A; Clark, Christina M; Frey, Gary N; Streckfus, Charles F; Quock, Ryan L

    2015-09-01

    The aim of this study was to examine the impact of psychomotor operative video demonstrations on first-year dental students who are performing specific procedures for the first time in a preclinical setting. The class was randomly divided into two groups, and three restorative procedures were selected. On the date on which each procedure was to be performed in the preclinical laboratory for the first time, one group (experimental, n=50) was shown a technique video for that specific procedure immediately before commencing the exercise; the control cohort (n=50) did not view the video. Technical performance on procedures was evaluated by students and two calibrated and blinded examiners. The students' perceptions of the experience were also collected in a survey. All first-year students participated in the study, for a 100% response rate. A Mann-Whitney U test did not show any group differences in technical performance (mean values on preparation: 77.1 vs. 77.8; amalgam: 82.7 vs. 82.8; composite: 79.7 vs. 78.0). A Spearman rho test revealed a significantly higher correlation in 13 out of 25 evaluation categories between student self-assessment and blinded examiner assessment for the experimental group. A chi-square test of questionnaire responses revealed a positive student perception of administering these videos for the preparation (X(2)=4.8, pstudent performance on preclinical operative procedures, but they were well received by students and augmented self-assessment ability. These findings suggest that videos can be a useful teaching aid in a preclinical environment, especially regarding comprehension of concepts.

  4. Operational circular No. 9 – Principles and procedures governing complaints of harassment

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 9 entitled "Principles and Procedures Governing Complaints of Harassment", approved by the Director-General following discussion in the Standing Concertation Committee meeting on 21 March 2011, is available on the intranet site of the Human Resources Department: https://cern.ch/hr-docs/opcirc/opcirc.asp Operational Circular No. 9 is applicable to any person working at or on behalf of CERN. It cancels and replaces Administrative Circular No. 32 entitled "Principles and Procedures Governing Complaints of Harassment” of February 2000. Department Head Office

  5. Apparatus and Experimental Procedures to Test Crystal Collimation

    CERN Document Server

    Montesano, S

    2012-01-01

    UA9 is an experimental setup operated in the CERN-SPS in view of investigating the feasibility of halo collimation assisted by bent crystals. The test collimation system is composed of one crystal acting as primary halo deflector in the horizontal plane and an absorber. Different crystals are tested in turn using two-arm goniometers with an angular reproducibility of better than 10 microrad. The performance of the system is assessed through the study of the secondary and tertiary halo in critical areas, by using standard machine instrumentation and few customized equipments. The alignment of the crystal is verified by measuring the loss rate close to the crystal position. The collimation efficiency is computed by intercepting the deflected halo with a massive collimator or with an imaging device installed into a Roman Pot. The leakage of the system is evaluated in the dispersion suppressor by means of movable aperture restrictions. In this contribution the setup and the experimental methods in use are revisit...

  6. Conditional Monthly Weather Resampling Procedure for Operational Seasonal Water Resources Forecasting

    Science.gov (United States)

    Beckers, J.; Weerts, A.; Tijdeman, E.; Welles, E.; McManamon, A.

    2013-12-01

    To provide reliable and accurate seasonal streamflow forecasts for water resources management several operational hydrologic agencies and hydropower companies around the world use the Extended Streamflow Prediction (ESP) procedure. The ESP in its original implementation does not accommodate for any additional information that the forecaster may have about expected deviations from climatology in the near future. Several attempts have been conducted to improve the skill of the ESP forecast, especially for areas which are affected by teleconnetions (e,g. ENSO, PDO) via selection (Hamlet and Lettenmaier, 1999) or weighting schemes (Werner et al., 2004; Wood and Lettenmaier, 2006; Najafi et al., 2012). A disadvantage of such schemes is that they lead to a reduction of the signal to noise ratio of the probabilistic forecast. To overcome this, we propose a resampling method conditional on climate indices to generate meteorological time series to be used in the ESP. The method can be used to generate a large number of meteorological ensemble members in order to improve the statistical properties of the ensemble. The effectiveness of the method was demonstrated in a real-time operational hydrologic seasonal forecasts system for the Columbia River basin operated by the Bonneville Power Administration. The forecast skill of the k-nn resampler was tested against the original ESP for three basins at the long-range seasonal time scale. The BSS and CRPSS were used to compare the results to those of the original ESP method. Positive forecast skill scores were found for the resampler method conditioned on different indices for the prediction of spring peak flows in the Dworshak and Hungry Horse basin. For the Libby Dam basin however, no improvement of skill was found. The proposed resampling method is a promising practical approach that can add skill to ESP forecasts at the seasonal time scale. Further improvement is possible by fine tuning the method and selecting the most

  7. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Surveillance of Environmental and Procedural Measures of Infection Control in the Operating Theatre Setting

    Directory of Open Access Journals (Sweden)

    Laura Dallolio

    2017-12-01

    Full Text Available The microbiological contamination of operating theatres and the lack of adherence to best practices by surgical staff represent some of the factors affecting Surgical Site Infections (SSIs. The aim of the present study was to assess the microbiological quality of operating settings and the staff compliance to the SSI evidence-based control measures. Ten operating rooms were examined for microbiological contamination of air and surfaces, after cleaning procedures, in “at rest” conditions. Furthermore, 10 surgical operations were monitored to assess staff compliance to the recommended practices. None of the air samples exceeded microbiological reference standards and only six of the 200 surface samples (3.0% were slightly above recommended levels. Potentially pathogenic bacteria and moulds were never detected. Staff compliance to best practices varied depending on the type of behaviour investigated and the role of the operator. The major not compliant behaviours were: pre-operative skin antisepsis, crowding of the operating room and hand hygiene of the anaesthetist. The good environmental microbiological quality observed is indicative of the efficacy of the cleaning-sanitization procedures adopted. The major critical point was staff compliance to recommended practices. Awareness campaigns are therefore necessary, aimed at improving the organisation of work so as to facilitate compliance to operative protocols.

  9. 14 CFR Appendix I to Part 417 - Methodologies for Toxic Release Hazard Analysis and Operational Procedures

    Science.gov (United States)

    2010-01-01

    ... either the methodology provided in the Risk Management Plan (RMP) Offsite Consequence Analysis Guidance..., App. I Appendix I to Part 417—Methodologies for Toxic Release Hazard Analysis and Operational Procedures I417.1General This appendix provides methodologies for performing toxic release hazard analysis...

  10. 34 CFR 602.23 - Operating procedures all agencies must have.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Operating procedures all agencies must have. 602.23 Section 602.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF... agencies must have. (a) The agency must maintain and make available to the public written materials...

  11. 76 FR 43693 - Standard Operating Procedure for “Notice to Industry” Letters

    Science.gov (United States)

    2011-07-21

    ... HUMAN SERVICES Food and Drug Administration Standard Operating Procedure for ``Notice to Industry...) for ``Notice to Industry'' Letters. The SOP describes the Center for Devices and Radiological Health's... ``Notice to Industry'' Letters to all manufacturers of a particular group of devices for which the Center...

  12. Standard operating procedures for female orgasmic disorder: consensus of the International Society for Sexual Medicine

    NARCIS (Netherlands)

    Laan, Ellen; Rellini, Alessandra H.; Barnes, Tricia

    2013-01-01

    As the field of sexual medicine evolves, it is important to continually improve patient care by developing contemporary "standard operating procedures" (SOPs), reflecting the consensus view of experts in sexual medicine. Few, if any, consensus SOPs have been developed for the diagnosis and treatment

  13. Effects on salmon (Salmo salar) from different operational procedures in fish farming

    OpenAIRE

    Bjordal, Åsmund; Fernö, Anders; Furevik, Dag M.; Huse, Ingvar

    1988-01-01

    The effects on farmed salmon caused by operational procedures as handling, de-lousing, removal of dead fish, grading and transfer were studied by underwater TV-observations, ultrasonic telemetry of heart rate and analyses of blood cortisol level. Handling and de-lousing were identified as important stressors.

  14. Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

    Science.gov (United States)

    Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

  15. A simulator study for the development and evaluation of operating procedures on a supersonic cruise research transport to minimize airport-community noise

    Science.gov (United States)

    Grantham, W. D.; Smith, P. M.; Deal, P. L.

    1980-01-01

    Piloted-simulator studies were conducted to determine takeoff and landing operating procedures for a supersonic cruise research transport concept that result in predicted noise levels which meet current Federal Aviation Administration (FAA) certification standards. With the use of standard FAA noise certification test procedures, the subject simulated aircraft did not meet the FAA traded-noise-level standards during takeoff and landing. However, with the use of advanced procedures, this aircraft meets the traded-noise-level standards for flight crews with average skills. The advanced takeoff procedures developed involved violating some of the current Federal Aviation Regulations (FAR), but it was not necessary to violate any FAR noise-test conditions during landing approach. Noise contours were also determined for some of the simulated takeoffs and landings in order to indicate the noise-reduction advantages of using operational procedures other than standard.

  16. 77 FR 35464 - Modifications to the Disability Determination Procedures; Extension of Testing of Some Disability...

    Science.gov (United States)

    2012-06-13

    ... ADMINISTRATION Modifications to the Disability Determination Procedures; Extension of Testing of Some Disability... Involving Modifications to the Disability Determination Procedures. SUMMARY: We are announcing the extension of tests involving modifications to disability determination procedures authorized by 20 CFR 404.906...

  17. 78 FR 45010 - Modifications to the Disability Determination Procedures; Extension of Testing of Some Disability...

    Science.gov (United States)

    2013-07-25

    ... ADMINISTRATION Modifications to the Disability Determination Procedures; Extension of Testing of Some Disability... involving modifications to the disability determination procedures. SUMMARY: We are announcing the extension of tests involving modifications to disability determination procedures authorized by 20 CFR 404.906...

  18. NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites

    Science.gov (United States)

    Rios, Joseph; Mulfinger, Daniel; Homola, Jeff; Venkatesan, Priya

    2016-01-01

    NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.

  19. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ...-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing for... moderate temperature test with Cold CO fuel, a moderate temperature test with Otto-cycle test fuel, and a warm temperature test with Otto-cycle test fuel, as described in table O-96-2 of § 86.1430. In order...

  20. Enhanced Sanitation Standard Operating Procedures Have Limited Impact on Listeria monocytogenes Prevalence in Retail Delis.

    Science.gov (United States)

    Etter, Andrea J; Hammons, Susan R; Roof, Sherry; Simmons, Courtenay; Wu, Tongyu; Cook, Peter W; Katubig, Alex; Stasiewicz, Matthew J; Wright, Emily; Warchocki, Steven; Hollingworth, Jill; Thesmar, Hilary S; Ibrahim, Salam A; Wiedmann, Martin; Oliver, Haley F

    2017-10-20

    In a recent longitudinal surveillance study in 30 U.S. retail delicatessens, 9.7% of environmental surfaces were positive for Listeria monocytogenes, and we found substantial evidence of persistence. In this study, we aimed to reduce the prevalence and persistence of L. monocytogenes in the retail deli environment by developing and implementing practical and feasible intervention strategies (i.e., sanitation standard operating procedures; SSOPs). These SSOPs were standardized across the 30 delis enrolled in this study. SSOP implementation was verified by systems inherent to each retailer. Each deli also was equipped with ATP monitoring systems to verify effective sanitation. We evaluated intervention strategy efficacy by testing 28 food and nonfood contact surfaces for L. monocytogenes for 6 months in all 30 retail delis. The efficacy of the intervention on the delis compared with preintervention prevalence level was not statistically significant; we found that L. monocytogenes could persist despite implementation of enhanced SSOPs. Systematic and accurate use of ATP monitoring systems varied widely among delis. The findings indicate that intervention strategies in the form of enhanced daily SSOPs were not sufficient to eliminate L. monocytogenes from highly prevalent and persistently contaminated delis and that more aggressive strategies (e.g., deep cleaning or capital investment in redesign or equipment) may be necessary to fully mitigate persistent contamination.

  1. Standard operating procedure for audio visual recording of informed consent: an initiative to facilitate regulatory compliance.

    Science.gov (United States)

    Parikh, P M; Prabhash, K; Govind, K B; Digumarti, R; Pandit, S; Banerjee, I; Biyani, R; Deshmukh, A; Doval, D; Bhattacharyya, G S; Gupta, S

    2014-01-01

    The office of the Drugs Controller General (India) vide order dated 19 th November 2013 has made audio visual (AV) recording of the informed consent mandatory for the conduct of all clinical trials in India. We therefore developed a standard operating procedure (SOP) to ensure that this is performed in compliance with the regulatory requirements, internationally accepted ethical standards and that the recording is stored as well as archived in an appropriate manner. The SOP was developed keeping in mind all relevant orders, regulations, laws and guidelines and have been made available online. Since, we are faced with unique legal and regulatory requirements that are unprecedented globally, this SOP will allow the AV recording of the informed consent to be performed, archived and retrieved to demonstrate ethical, legal and regulatory compliance. We also compared this to the draft guidelines for AV recording dated 9 th January 2014 developed by Central Drugs Standard Control Organization. Our future efforts will include regular testing, feedback and update of the SOP.

  2. 9 CFR 147.9 - Standard test procedures for avian influenza.

    Science.gov (United States)

    2010-01-01

    ... influenza. 147.9 Section 147.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE... Blood Testing Procedures § 147.9 Standard test procedures for avian influenza. (a) The agar gel immunodiffusion (AGID) test should be considered the basic screening test for antibodies to Type A influenza...

  3. 40 CFR 85.2222 - On-board diagnostic test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false On-board diagnostic test procedures... Warranty Short Tests § 85.2222 On-board diagnostic test procedures. The test sequence for the inspection of on-board diagnostic systems on 1996 and newer light-duty vehicles and light-duty trucks shall consist...

  4. 78 FR 675 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Furnaces and...

    Science.gov (United States)

    2013-01-04

    ... reducing the test burden, test conditions impacting the annual fuel utilization efficiency (AFUE) metric... that could be considered for this cycle of test procedure amendments. F. Alternative Methods for... Part 430 RIN 1904-AC79 Energy Conservation Program for Consumer Products: Test Procedure for...

  5. [Handling modern imaging procedures in a high-tech operating room].

    Science.gov (United States)

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  6. PDSS/IMC qualification test software acceptance procedures

    Science.gov (United States)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  7. 76 FR 56661 - Energy Conservation Program: Test Procedures for General Service Fluorescent Lamps, General...

    Science.gov (United States)

    2011-09-14

    ... General Service Fluorescent Lamps, General Service Incandescent Lamps, and Incandescent Reflector Lamps... proposing to revise its test procedures for general service fluorescent lamps (GSFLs) and general service... Procedures for General Service Fluorescent Lamps, General Service Incandescent Lamps, and Incandescent...

  8. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  9. A study on development of the step complexity measure for emergency operating procedures using entropy concepts

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. K.; Jung, W. D.; Kim, J. W.; Ha, J. J

    2001-04-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. For example, it was reported that about 70% of aviation accidents are due to human errors, and that approximately 28% of accidents in process industries are caused by human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors in aviation and manufacturing industries. In case of NPPs, the importance of procedures is more salient than other industries because not only over 50% of human errors were due to procedures but also about 18% of accidents were caused by the failure of following procedures. Thus, the provision of emergency operating procedures (EOPs) that are designed so that the possibility of human errors can be reduced is very important. To accomplish this goal, a quantitative and objective measure that can evaluate EOPs is indispensable. The purpose of this study is the development of a method that can quantify the complexity of a step included in EOPs. In this regard, the step complexity measure (SC) is developed based on three sub-measures such as the SIC (step information complexity), the SLC (step logic complexity) and the SSC (step size complexity). To verify the SC measure, not only quantitative validations (such as comparing SC scores with subjective evaluation results and with averaged step performance time) but also qualitative validations to clarify physical meanings of the SC measure are performed.

  10. 40 CFR 60.485 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...” at 25 °C and 760 mm Hg (77 °F and 14.7 psi), kcal/g-mole (5) Method 18 or ASTM D6420-99 (2004) (where... procedures shall be used: (1) Procedures that conform to the general methods in ASTM E260-73, 91, or 96, E168... 0.3 kPa at 20 °C (1.2 in. H2O at 68 °F). Standard reference texts or ASTM D2879-83, 96, or 97...

  11. Prediction of post-operative pain after a laparoscopic tubal ligation procedure

    DEFF Research Database (Denmark)

    Rudin, A.; Wolner-Hanssen, P.; Hellbom, M.

    2008-01-01

    BACKGROUND: Pre-operative identification of reliable predictors of post-operative pain may lead to improved pain management strategies. We investigated the correlation between pre-operative pain, psychometric variables, response to heat stimuli and post-operative pain following a laparoscopic tubal...... Questionnaire (SF-MPQ), respectively. Pre-operative assessments of thermal thresholds and pain response to randomized series of heat stimuli (1 s, 44-48 degrees C) were made with quantitative sensory testing technique. Post-operative pain intensity was evaluated daily by a visual analogue scale during rest...... and during standardized dynamic conditions for 10 days following surgery. Univariate and multivariate regression analyses were used to construct prediction models. RESULTS: Fifty-nine patients completed the study. Post-operative pain was significantly correlated with pre-operative pain (SF-MPQ), heat pain...

  12. 40 CFR 63.425 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... CFR 60.503 of this chapter, except a reading of 500 ppm shall be used to determine the level of leaks... according to the procedures in this paragraph. (1) The leak definition shall be 21,000 ppm as propane. Use propane to calibrate the instrument, setting the span at the leak definition. The response time to 90...

  13. 40 CFR 63.694 - Testing methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... related to measuring the concentrations of volatile compounds: (1) Documentation of site-specific... of volatile compounds: (1) Documentation of site-specific procedures to minimize the loss of...-site material stream to the plant site in a manner such that volatilization of organics contained in...

  14. State Token Petri Net modeling method for formal verification of computerized procedure including operator's interruptions of procedure execution flow

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yun Goo [Central Research Institute, Korea Hydro and Nuclear Power Co., LTD, Daejeon (Korea, Republic of); Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2012-12-15

    The Computerized Procedure System (CPS) is one of the primary operating support systems in the digital Main Control Room. The CPS displays procedure on the computer screen in the form of a flow chart, and displays plant operating information along with procedure instructions. It also supports operator decision making by providing a system decision. A procedure flow should be correct and reliable, as an error would lead to operator misjudgement and inadequate control. In this paper we present a modeling for the CPS that enables formal verification based on Petri nets. The proposed State Token Petri Nets (STPN) also support modeling of a procedure flow that has various interruptions by the operator, according to the plant condition. STPN modeling is compared with Coloured Petri net when they are applied to Emergency Operating Computerized Procedure. A converting program for Computerized Procedure (CP) to STPN has been also developed. The formal verification and validation methods of CP with STPN increase the safety of a nuclear power plant and provide digital quality assurance means that are needed when the role and function of the CPS is increasing.

  15. Cold and compression in the management of musculoskeletal injuries and orthopedic operative procedures: a narrative review

    Directory of Open Access Journals (Sweden)

    Jon E Block

    2010-07-01

    Full Text Available Jon E BlockJon E Block, PhD., Incorporated, San Francisco, CA, USAAbstract: Cold and compression are routinely applied immediately after acute injury or ­following surgery to alleviate pain, reduce swelling and speed functional recovery. The objective of this literature review is to describe the published clinical findings regarding combined cold and compression therapy in the management of musculoskeletal injuries and after orthopedic operative procedures. Of 33 potential articles triaged, the findings of 21 randomized controlled trials were assessed and summarized. The findings reported by these 21 studies were largely subjective pain outcomes and, to a lesser degree, swelling and range of motion, and were inconsistent and divergent, making it difficult to recommend the most appropriate, effective clinical application of cold and compression. Further, 18 of the 21 reported studies evaluated cold and static compression, where the extent and duration of the compression was not uniform within or across studies. Operative procedures may offer a more controlled environment for rigorous investigations. However, such studies must be powered sufficiently to account for variations in surgical procedure that could affect outcomes. More uniform operative procedures, such as total knee arthroplasty, represent a well circumscribed intervention for studying the clinical utility of cold compression therapy because the operative technique is standardized, surgical tissue damage is extensive, intraoperative blood loss is high, and post-operative edema and pain are severe. Findings from randomized controlled trials of knee arthroplasty generally showed cold compression therapy provides better outcomes such as pain relief than alternative interventions. While the effects of cold and static compression are clearly better than no treatment, they do not appear to be directly additive.Keywords: cryotherapy, injury

  16. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    Energy Technology Data Exchange (ETDEWEB)

    Goetzler, William [Navigant Consulting, Inc., Burlington, MA (United States); Sutherland, Timothy [Navigant Consulting, Inc., Burlington, MA (United States); Kar, Rahul [Navigant Consulting, Inc., Burlington, MA (United States); Foley, Kevin [Navigant Consulting, Inc., Burlington, MA (United States)

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  17. Evaluating North Carolina Food Pantry Food Safety-Related Operating Procedures.

    Science.gov (United States)

    Chaifetz, Ashley; Chapman, Benjamin

    2015-11-01

    Almost one in seven American households were food insecure in 2012, experiencing difficulty in providing enough food for all family members due to a lack of resources. Food pantries assist a food-insecure population through emergency food provision, but there is a paucity of information on the food safety-related operating procedures used in the pantries. Food pantries operate in a variable regulatory landscape; in some jurisdictions, they are treated equivalent to restaurants, while in others, they operate outside of inspection regimes. By using a mixed methods approach to catalog the standard operating procedures related to food in 105 food pantries from 12 North Carolina counties, we evaluated their potential impact on food safety. Data collected through interviews with pantry managers were supplemented with observed food safety practices scored against a modified version of the North Carolina Food Establishment Inspection Report. Pantries partnered with organized food bank networks were compared with those that operated independently. In this exploratory research, additional comparisons were examined for pantries in metropolitan areas versus nonmetropolitan areas and pantries with managers who had received food safety training versus managers who had not. The results provide a snapshot of how North Carolina food pantries operate and document risk mitigation strategies for foodborne illness for the vulnerable populations they serve. Data analysis reveals gaps in food safety knowledge and practice, indicating that pantries would benefit from more effective food safety training, especially focusing on formalizing risk management strategies. In addition, new tools, procedures, or policy interventions might improve information actualization by food pantry personnel.

  18. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  19. 32 CFR 634.35 - Chemical testing policies and procedures.

    Science.gov (United States)

    2010-07-01

    ... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.35... substances are tested using generally accepted scientific and medical methods and standards. (2) Breath tests... tests of personnel involved in fatal accidents. (1) Installation medical authorities will immediately...

  20. A "Rearrangement Procedure" for Scoring Adaptive Tests with Review Options

    Science.gov (United States)

    Papanastasiou, Elena C.; Reckase, Mark D.

    2007-01-01

    Because of the increased popularity of computerized adaptive testing (CAT), many admissions tests, as well as certification and licensure examinations, have been transformed from their paper-and-pencil versions to computerized adaptive versions. A major difference between paper-and-pencil tests and CAT from an examinee's point of view is that in…

  1. 40 CFR 90.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... fuel consumption. For Phase 2 Class I-B, Class I, and Class II natural gas fueled engines the test is... of three different test cycles which are application specific for engines which span the typical... Class I-A, I-B, and I—V engines). The test cycles for Class I-B, I, and II engines consist of one idle...

  2. 40 CFR 86.127-00 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... evaporative emissions. (4) Fuel spitback (this test is not required for gaseous-fueled vehicles). (b) The FTP Otto-cycle exhaust emission test is designed to determine gaseous THC, CO, CO2, CH4, NOX, and... test cycle simulates urban driving speeds and accelerations that are not represented by the FTP Urban...

  3. 40 CFR 86.154-98 - Measurement procedure; refueling test.

    Science.gov (United States)

    2010-07-01

    ... measurement portion of the refueling test shall be performed as follows: (1) The line from the fuel tank(s) to... Administrator conducts the non-integrated system partial refueling test, the fuel flow shall continue until the... refueling tests. The fuel flow shall continue until the refueling nozzle automatic shut-off is activated...

  4. 40 CFR 86.127-12 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... emissions. (4) Fuel spitback (this test is not required for gaseous-fueled vehicles). (b) The FTP Otto-cycle... of the following emissions, depending upon the specific test requirements and the vehicle fuel type... (variable dilution) sampler or critical flow venturi sampler. (c) The diesel-cycle exhaust emission test is...

  5. 46 CFR 164.007-4 - Testing procedure.

    Science.gov (United States)

    2010-10-01

    ...) Preparation of fire test specimens. (1) The fire test specimens shall be conditioned to approximately constant... appreciable volumes of smoke or noxious vapors from the unexposed side of the test specimen. The specimen..., including the retests, shall be conducted at the National Bureau of Standards or other laboratories...

  6. 9 CFR 147.7 - Standard test procedures for mycoplasma. 5

    Science.gov (United States)

    2010-01-01

    ... Blood Testing Procedures § 147.7 Standard test procedures for mycoplasma. 5 5 For additional information... pipette or standardized loop (rinsed between samples) to 11/2 inch squares on a ruled glass plate. Limit... deposit resuspended to give a 25 percent suspension of packed RBC's in Alsever's solution. (In testing...

  7. 40 CFR Appendix I to Subparts D... - Motorcycle Noise Emission Test Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Motorcycle Noise Emission Test... AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycle...—Motorcycle Noise Emission Test Procedures Appendix I-1 to Subparts D and E—Test Procedure for Street and off...

  8. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... RIN 1904-AB78 Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of...) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... measuring the standby mode and off mode energy use of products that combine a microwave oven with other...

  9. 78 FR 62488 - Energy Conservation Program: Compliance Date for the Dehumidifier Test Procedure

    Science.gov (United States)

    2013-10-22

    ... Part 430 RIN 1904-AD06 Energy Conservation Program: Compliance Date for the Dehumidifier Test Procedure... for the dehumidifier test procedures established under the Energy Policy and Conservation Act (EPCA). The proposed amendments would require manufacturers to test using only the active mode provisions in...

  10. 78 FR 44189 - Petition for Modification of Single Car Air Brake Test Procedures

    Science.gov (United States)

    2013-07-23

    ... the Federal Railroad Administration (FRA) per 49 CFR 232.307 to modify the single car air brake test procedures located in AAR Standard S-486, Code of Air Brake System Tests for Freight Equipment-- Single Car... Federal Railroad Administration Petition for Modification of Single Car Air Brake Test Procedures In...

  11. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space, the j...

  12. The importance of production standard operating procedure in a family business company

    Science.gov (United States)

    Hongdiyanto, C.

    2017-12-01

    Plastic industry is a growing sector, therefore UD X which engage in this business has a great potential to grow as well. The problem faced by this family business company is that no standard operating procedure is used and it lead to problem in the quality and quantity produced. This research is aim to create a production standard operating procedure for UD X. Semistructure interview is used to gather information from respondent to help writer create the SOP. There are four SOP’s created, namely: classifying SOP, sorting SOP, milling SOP and packing SOP. Having SOP will improve the effectiveness of production because employees already know how to work in each stages of production process.

  13. The David procedure for salvage of a failing autograft after the Ross operation.

    Science.gov (United States)

    Liebrich, Markus; Weimar, Timo; Tzanavaros, Ioannis; Roser, Detlef; Doll, Kai-Nicolas; Hemmer, Wolfgang B

    2014-12-01

    Dilatation of the pulmonary autograft is a major fear after the Ross procedure. We analyzed the results after reoperation for autograft dysfunction using a valve-sparing reimplantation technique (David procedure). From 1995 to 2012, 645 Ross operations were performed, with 630 (98%) of these as freestanding root replacements (mean follow-up, 8.3 ± 4.6 years). Forty-nine autograft reoperations occurred in 46 patients (0.89%/patient-year). Between 2005 and 2013, reoperation using a David procedure was performed in 18 of 35 patients (52%) with autograft dilatation at a mean interval of 11 ± 3.2 years after the Ross operation. The mean age of 18 patients receiving a David procedure as reoperation was 49.8 ± 13.9 years; 83% were male. The 30-day reoperative mortality was zero. The mean vascular graft size used for reimplantation was 29.5 ± 1.7 mm. At a mean follow-up time of 3.2 ± 2.3 years (100% complete), all patients (18 of 18) were alive and in New York Heart Association functional class I. One patient (5%) needed valve replacement for recurrent aortic regurgitation 2.6 years after the David procedure. In the remaining patients (95%), freedom from aortic regurgitation of grade 2 or greater was 100% at 3 years (regurgitation grade Ross operation and revealed good function of the preserved autograft at midterm follow-up. Reoperations could be performed with low perioperative morbidity and mortality. Copyright © 2014 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  14. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    Energy Technology Data Exchange (ETDEWEB)

    Han, Su Chul [Division of Medical Radiation Equipment, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Hong, Dong Hee [Dept. of Radiology Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures.

  15. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options.

  16. Investigation of Bending Test Procedures for Engineered Polymer Composite Railroad Ties

    Science.gov (United States)

    2016-12-01

    ER D C/ CE RL C R- 16 -6 Investigation of Bending Test Procedures for Engineered Polymer Composite Railroad Ties Co ns tr uc tio n En... Test Procedures for Engineered Polymer Composite Railroad Ties Claire G. Ball CTL Group 5400 Old Orchard Road Skokie, IL 60077 Final report...AREMA) Manual for Railway Engineering. One item not completely re- solved in this engineering guidance is the testing procedure for measuring the

  17. Intelligent cruise control field operational test. Volume I, Technical report

    Science.gov (United States)

    1998-05-01

    This document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The main goal of the work is to characterize safety and comfort issues that are fundamental to human inte...

  18. Intelligent cruise control field operational test : interim report

    Science.gov (United States)

    1997-03-01

    This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...

  19. What is a Bristow-Latarjet procedure? A review of the described operative techniques and outcomes.

    Science.gov (United States)

    Cowling, P D; Akhtar, M A; Liow, R Y L

    2016-09-01

    A variety of operative techniques have been described as under the term 'Bristow-Latarjet' procedure. This review aims to define the original procedure, and compare the variation in techniques described in the literature, assessing any effect on clinical outcomes. A systematic review of 24 studies was performed to compare specific steps of the technique (coracoid osteotomy site, subscapularis approach, orientation and position of coracoid graft fixation and fixation method, additional labral and capsular repair) and detect any effect this variability had on outcomes. Overall recurrence rate was 5.36% (2.94% to 43%). Half of the studies performed the procedure for recurrent shoulder instability, with only five studies documenting glenoid bone loss as an indication: 12 studies used the procedure as the primary surgical intervention for recurrent instability. No change in outcome was noted when examining variation in the coracoid osteotomy site, the fixation site on the scapular neck, the fixation method or whether a capsular repair was also performed. Performing a horizontal split in subscapularis may preserve external rotation compared with performing a tenotomy. This is the first review to examine various operative techniques of the Bristow-Latarjet procedure, and their effect on outcome. We found that other than the approach through subscapularis, outcome was independent of the surgical technique, and depended more on patient selection. We would commend future publications on this procedure to provide a detailed description of the surgical technique, and as a minimum present rates of recurrence as an outcome measure. Cite this article: Bone Joint J 2016;98-B:1208-14. ©2016 The British Editorial Society of Bone & Joint Surgery.

  20. Standard Operating Procedures at Skanska : Standardization and continuous improvementin the construction industry

    OpenAIRE

    Bergerova, Katarina

    2010-01-01

    The construction industry has faced severe criticism against its inefficiency, high costs and insufficient quality. Besides, the building branch is one of the most dangerous occupations.Skanska Sverige AB runs an international project focused mainly on improving safety, increasing overall process efficiency and providing customers higher value. A part of this project are Standard operating procedures. These are supposed to be the best practices known at the company and should be used on sites...

  1. Retrograde Procedural Planning, Skills Development, and How to Set Up a Base of Operations.

    Science.gov (United States)

    Spratt, James C; Strange, Julian W

    2012-07-01

    This article addresses the practical steps required when adopting retrograde access as part of the treatment of chronic total occlusions (CTOs). The article focuses on procedure rationale, equipment required, the practical steps, and considerations involved in collateral-channel crossing and setting up a "base of operations" at the proximal cap of the CTO. It also describes simple methods of wire escalation. Copyright © 2012 Elsevier Inc. All rights reserved.

  2. Evaluation of operation and death statistics at surgical procedures by using attribute control charts

    OpenAIRE

    Tomak, Leman; Bek, Yülsel

    2018-01-01

    Statistical Process Control (SPC) is a technique that enables the quality controllerto monitor, analyze, predict, control, and improve a production processthrough control charts. So to use of SPC in medical field is very important.The cases were obtained at the Ondokuz Mayis University Faculty of medicinedepartments of surgical sciences within two year were evaluated. The outcomesof the operations in these departments were followed throughout twenty-fourmonths. For a surgical procedure has tw...

  3. An Overview of SM18 Cold Test Operation and a Way Forward

    CERN Document Server

    Allen, D; Hemelsoet, G H; Henriksen, J; Mazars, J; Niquille, C; Ottaviani, J; Priestnall, K; Vadillo, I; CERN. Geneva. AB Department

    2003-01-01

    The following document is a collection of observations and improvements that we have collected and collated. We are 9 people from PS and SL Division staff. (representing significant & broad work experience from PS & PSB machines Accelerator operation, SL Experimental physics North Area experience in beam line operation & Safety, SPS &LEP operation experience and several years of experience in RF hardware & operation in SL Division). We have participated in the SM18 cold tests operation since 4 November 2002 for a period of 4 weeks*, organized by V. Chohan, LHC Division, who is our supervisor for working on magnet cold tests. This document is categorized in 3 broad areas, for each of which a single person acted as a 'rapporteur' to put it all together. The 3 areas of immediate concern are: 1. Safety 2. Work And Procedures 3. Environment & Control Room.

  4. Mental workload measurement for emergency operating procedures in digital nuclear power plants.

    Science.gov (United States)

    Gao, Qin; Wang, Yang; Song, Fei; Li, Zhizhong; Dong, Xiaolu

    2013-01-01

    Mental workload is a major consideration for the design of emergency operation procedures (EOPs) in nuclear power plants. Continuous and objective measures are desired. This paper compares seven mental workload measurement methods (pupil size, blink rate, blink duration, heart rate variability, parasympathetic/sympathetic ratio, total power and (Goals, Operations, Methods, and Section Rules)-(Keystroke Level Model) GOMS-KLM-based workload index) with regard to sensitivity, validity and intrusiveness. Eighteen participants performed two computerised EOPs of different complexity levels, and mental workload measures were collected during the experiment. The results show that the blink rate is sensitive to both the difference in the overall task complexity and changes in peak complexity within EOPs, that the error rate is sensitive to the level of arousal and correlate to the step error rate and that blink duration increases over the task period in both low and high complexity EOPs. Cardiac measures were able to distinguish tasks with different overall complexity. The intrusiveness of the physiological instruments is acceptable. Finally, the six physiological measures were integrated using group method of data handling to predict perceived overall mental workload. The study compared seven measures for evaluating the mental workload with emergency operation procedure in nuclear power plants. An experiment with simulated procedures was carried out, and the results show that eye response measures are useful for assessing temporal changes of workload whereas cardiac measures are useful for evaluating the overall workload.

  5. A Test Device Module of the Step Motor Driver for HANARO CAR Operation

    Energy Technology Data Exchange (ETDEWEB)

    Im, Yun-Taek; Doo, Seung-Gyu; Shin, Jin-Won; Kim, Ki-Hyun; Choi, Young-San; Lee, Jung-Hee; Kim, Hyung-Kyoo; Lee, Choong-Sung [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    The brand-new control system is reliable and has advantages compared with the old control system, and the installed system covers all functional operations of old system. Nevertheless, packaged RTP systems do not include a step motor or driver, and it is necessary to develop a proper test device to check the step motor and driver without using the RTP system. In particular, the operation of a CAR (Control Absorber Rod) requires many complicated procedures. Occasionally, it takes significant time to prepare for a field test. In this work, a test device module for a step motor diver is shown to emulate a HANARO CAR operation, and the test device system architecture, operational principle, and experiment results are presented. A commercial 8-bit μ-processor is applied to implement the device. A portable test device for HANARO CAR operation is presented. An 8-bit μ-controller is used to emulate a HANARO CAR operation. The digital interface, as well as the functional operation, of the test device module matches that of the currently used driver. This device can be used to check the functional validity of the step motor and driver.

  6. [Physical diagnostic procedures: whispered speech and tuning fork test].

    Science.gov (United States)

    Grote, J J; de Laat, J A

    1998-08-08

    Hearing impairment occurs in 10% of the Dutch population and may lead to major communication problems and even social isolation. A good method to detect hearing loss in a general practice is the screening audiometer. The treating physician may further use the whispered speech test and tuning fork tests which together give a good impression of the severity and the nature of the hearing loss if any. The whispered speech test is best performed in the standardized form according to the guideline 'Slechthorendheid' [hardness of hearing] of the Dutch College of General Practitioners (NHG), in which certain combinations of letters are recommended. The tuning fork tests according to Rinne and Weber indicate a difference in perception and conduction deafness, and are decisive for any hearing asymmetry. Use of the whispered speech test and of the tuning fork tests is recommended for adults and children from the age of 7.

  7. High-Frequency Axial Fatigue Test Procedures for Spectrum Loading

    Science.gov (United States)

    2016-07-20

    closed-loop digital test frame controller with a command feedback compensation scheme was used to minimize controller error during testing. 15...controller response during variable amplitude loading, and a closed-loop digital test frame controller with a command feedback compensation scheme was...failures beyond 10 7 cycles can be caused by several competing failure mechanisms and may result in a transition from surface dominated crack

  8. 40 CFR 86.160-00 - Exhaust emission test procedure for SC03 emissions.

    Science.gov (United States)

    2010-07-01

    ... New Otto-Cycle Complete Heavy-Duty Vehicles; Test Procedures § 86.160-00 Exhaust emission test... official test cycle, is either conducted in an environmental test facility or under test conditions that...-00. (1) Drain and fill the vehicle's fuel tank to 40 percent capacity with test fuel. If a vehicle...

  9. 49 CFR 219.611 - Test result indicating prohibited alcohol concentration; procedures.

    Science.gov (United States)

    2010-10-01

    ... concentration; procedures. 219.611 Section 219.611 Transportation Other Regulations Relating to Transportation... concentration; procedures. Procedures for administrative handling by the railroad in the event an employee's confirmation test indicates an alcohol concentration of .04 or greater are set forth in § 219.104. ...

  10. 40 CFR 60.176 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...). (b) The owner or operator shall determine compliance with the particulate matter, sulfur dioxide (SO2... to determine the particulate matter concentration. The sampling time and sample volume for each run....175(b). The monitoring system drift during the run may not exceed 2 percent of the span value. (3...

  11. 40 CFR 60.166 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...) The owner or operator shall determine compliance with the particulate matter, sulfur dioxide (SO2) and... determine the particulate matter concentration. The sampling time and sample volume for each run shall be at... monitoring system drift during the run may not exceed 2 percent of the span value. (3) Method 9 and the...

  12. 40 CFR 60.186 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...). (b) The owner or operator shall determine compliance with the particulate matter, sulfur dioxide (SO2... to determine the particulate matter concentration. The sampling time and sample volume for each run....185(b). The monitoring system drift during the run may not exceed 2 percent of the span value. (3...

  13. 10 CFR 431.282 - Test Procedures [Reserved

    Science.gov (United States)

    2010-01-01

    ... means a device used with an electric discharge lamp to obtain necessary circuit conditions (voltage, current, and waveform) for starting and operating. High intensity discharge lamp means an electric-discharge lamp in which— (1) The light-producing arc is stabilized by the arc tube wall temperature; and (2...

  14. Complete Non-Radioactive Operability Tests for Cladding Hull Chlorination

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Emory D [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Johnson, Jared A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hylton, Tom D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Brunson, Ronald Ray [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hunt, Rodney Dale [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DelCul, Guillermo Daniel [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bradley, Eric Craig [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Spencer, Barry B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    Non-radioactive operability tests were made to test the metal chlorination reactor and condenser and their accessories using batch chlorinations of non-radioactive cladding samples and to identify optimum operating practices and components that need further modifications prior to installation of the equipment into the hot cell for tests on actual used nuclear fuel (UNF) cladding. The operability tests included (1) modifications to provide the desired heating and reactor temperature profile; and (2) three batch chlorination tests using, respectively, 100, 250, and 500 g of cladding. During the batch chlorinations, metal corrosion of the equipment was assessed, pressurization of the gas inlet was examined and the best method for maintaining solid salt product transfer through the condenser was determined. Also, additional accessing equipment for collection of residual ash and positioning of the unit within the hot cell were identified, designed, and are being fabricated.

  15. Intelligent Tutoring Systems for Procedural Task Training of Remote Payload Operations at NASA

    Science.gov (United States)

    Ong, James; Noneman, Steven

    2000-01-01

    Intelligent Tutoring Systems (ITSs) encode and apply the subject matter and teaching expertise of experienced instructors to provide students with individualized instruction automatically. ITSs complement training simulators by providing automated instruction when it is not economical or feasible to dedicate an instructor to each student during training simulations. Despite their proven training effectiveness and favorable operating cost, however, relatively few ITSs are in use. This is largely because it is usually costly and difficult to encode the task knowledge used by the ITS to evaluate the student's actions and assess the student's performance. Procedural tasks are tasks for which there exist procedures, guidelines, and strategies that determine the correct set of steps to be taken within each situation. To lower the cost and difficulty of creating tutoring systems for procedural task training, Stottler Henke Associates, Inc. (SHAI) worked closely with the Operations Training Group at NASA's Marshall Space Flight Center to develop the Task Tutor Toolkit (T (exp 3)), a generic tutoring system shell and scenario authoring tool. The Task Tutor Toolkit employs a case-based reasoning approach where the instructor creates a procedure template that specifies the range of student actions that are "correct" within each scenario. Because each procedure template is specific to a single scenario, the system can employ relatively simple reasoning methods to represent a correct set of actions and assess student performance. This simplicity enables a non-programmer to specify task knowledge quickly and easily by via graphical user interface, using a "demonstrate, generalize, and annotate" paradigm, that recognizes the range of possible valid actions and infers principles understood (or misunderstood) by the student when those actions are carried out. The Task Tutor Toolkit was also designed to be modular and general, so that it can be interfaced with a wide range of

  16. Short Operative Duration and Surgical Site Infection Risk in Hip and Knee Arthroplasty Procedures

    Science.gov (United States)

    Dicks, Kristen V.; Baker, Arthur W.; Durkin, Michael J.; Anderson, Deverick J.; Moehring, Rebekah W.; Chen, Luke F.; Sexton, Daniel J.; Weber, David J.; Lewis, Sarah S.

    2016-01-01

    OBJECTIVE To determine the association (1) between shorter operative duration and surgical site infection (SSI) and (2) between surgeon median operative duration and SSI risk among first-time hip and knee arthroplasties. DESIGN Retrospective cohort study SETTING A total of 43 community hospitals located in the southeastern United States. PATIENTS Adults who developed SSIs according to National Healthcare Safety Network criteria within 365 days of first-time knee or hip arthroplasties performed between January 1, 2008 and December 31, 2012. METHODS Log-binomial regression models estimated the association (1) between operative duration and SSI outcome and (2) between surgeon median operative duration and SSI outcome. Hip and knee arthroplasties were evaluated in separate models. Each model was adjusted for American Society of Anesthesiology score and patient age. RESULTS A total of 25,531 hip arthroplasties and 42,187 knee arthroplasties were included in the study. The risk of SSI in knee arthroplasties with an operative duration shorter than the 25th percentile was 0.40 times the risk of SSI in knee arthroplasties with an operative duration between the 25th and 75th percentile (risk ratio [RR], 0.40; 95% confidence interval [CI], 0.38–0.56; P operative duration did not demonstrate significant association with SSI for hip arthroplasties (RR, 1.04; 95% CI, 0.79–1.37; P =.36). Knee arthroplasty surgeons with shorter median operative durations had a lower risk of SSI than surgeons with typical median operative durations (RR, 0.52; 95% CI, 0.43–0.64; P operative durations were not associated with a higher SSI risk for knee or hip arthroplasty procedures in our analysis. PMID:26391277

  17. Evaluation of Surface Infiltration Testing Procedures in Permeable Pavement Systems

    Science.gov (United States)

    The ASTM method (ASTM C1701) for measuring infiltration rate of in-place pervious concrete provides limited guidance on how to select testing locations, so research is needed to evaluate how testing sites should be selected and how results should be interpreted to assess surface ...

  18. 24 CFR 3280.402 - Test procedure for roof trusses.

    Science.gov (United States)

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Testing § 3280.402 Test... suitable hydraulic, pneumatic, or mechanical system, masonry units, or weights to simulate design loads... applicable factor of safety for wood trusses shall be taken as 2.50). (e) Trusses qualifying under the...

  19. 40 CFR 60.335 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... (Ho−0.00633) (288°K/Ta)1.53 Where: NOX = emission concentration of NOX at 15 percent O2 and ISO... kilopascals ambient pressure, mm Hg, Po = observed combustor inlet absolute pressure at test, mm Hg, Ho... under § 60.334(b). (iii) The requirement to test at three additional load levels is waived. (8) If the...

  20. 40 CFR 80.165 - Certification test procedures and standards.

    Science.gov (United States)

    2010-07-01

    ..._locations.html. Copies of this material may be obtained from ASTM, 1916 Race St., Philadelphia, PA 19103. (2... from ASTM, 1916 Race St., Philadelphia, PA 19103. (c) If conducted using test fuels meeting all... Board, “Test Method for Evaluating Port Fuel Injector (PFI) Deposits in Vehicle Engines”, March 1, 1991...

  1. Systematic procedure for generating operational policies to achieve target crystal size distribution (CSD) in batch cooling crystallization

    DEFF Research Database (Denmark)

    Abdul Samad, Noor Asma Fazli; Singh, Ravendra; Sin, Gürkan

    2011-01-01

    A systematic procedure to achieve a target crystal size distribution (CSD) under generated operational policies in batch cooling crystallization is presented. An analytical CSD estimator has been employed in the systematic procedure to generate the necessary operational policies to achieve the ta...

  2. A Guide for Developing Standard Operating Job Procedures for the Grit Removal Process Wastewater Treatment Facility. SOJP No. 2.

    Science.gov (United States)

    Deal, Gerald A.; Montgomery, James A.

    This guide describes standard operating job procedures for the grit removal process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up, continuous operation, and shut-down procedures. A description of the equipment used in the process is given. Some theoretical material is presented. (BB)

  3. Adhesion testing procedure for hot-poured crack sealants.

    Science.gov (United States)

    2008-11-01

    Crack sealing is a common pavement maintenance treatment because it extends pavement service life significantly. : However, crack sealant often fails prematurely due to a loss of adhesion. Because current test methods are mostly : empirical and only ...

  4. 21 CFR 352.72 - General testing procedures.

    Science.gov (United States)

    2010-04-01

    ... sunscreen application shall be 2 milligrams per square centimeter. For oils and most lotions, the viscosity... noncompliant (e.g., subject withdraws from the test due to illness or work conflicts, subject does not shield...

  5. 40 CFR 89.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    .... The test is applicable to engines equipped with catalytic or direct-flame afterburners, induction... and functioning. (2) On air-cooled engines, the fan shall be installed. (3) Additional accessories...

  6. 46 CFR 160.066-12 - Operational tests.

    Science.gov (United States)

    2010-10-01

    ...). (1) An “accept lot” decision must be reached in order to pass the operational tests. (2) If a “reject...”, and the result of the second test. Signals from “reject lots” may not, unless subsequently accepted... conditioning required by paragraph (b) of this section it must be fired as described by the manufacturer's...

  7. Automated particulate sampler field test model operations guide

    Energy Technology Data Exchange (ETDEWEB)

    Bowyer, S.M.; Miley, H.S.

    1996-10-01

    The Automated Particulate Sampler Field Test Model Operations Guide is a collection of documents which provides a complete picture of the Automated Particulate Sampler (APS) and the Field Test in which it was evaluated. The Pacific Northwest National Laboratory (PNNL) Automated Particulate Sampler was developed for the purpose of radionuclide particulate monitoring for use under the Comprehensive Test Ban Treaty (CTBT). Its design was directed by anticipated requirements of small size, low power consumption, low noise level, fully automatic operation, and most predominantly the sensitivity requirements of the Conference on Disarmament Working Paper 224 (CDWP224). This guide is intended to serve as both a reference document for the APS and to provide detailed instructions on how to operate the sampler. This document provides a complete description of the APS Field Test Model and all the activity related to its evaluation and progression.

  8. 40 CFR 60.614 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ....0367) (−0.000448) (−0.0051) (4.59) HT ≥ 11.2 MJ/scm 0.309 0.0619 −0.0043 −0.0034 2.08 HT ≥ 301 Btu/scf) (0.0193) (0.00788) (−0.000010) (−0.0034) (4.59) (g) Each owner or operator of an affected facility... initial TRE index value is greater than 4.0 and the recalculated TRE index value is less than or equal to...

  9. Offline Interoperability, Cost Reduction and R eliability for Operational Procedures Using Meta-Modeling Technology

    Science.gov (United States)

    Poupart, E.; Jolly, G.; Percebois, C.; Bazex, P.; Palanque, P.; Basnyat, S.; Rabault, P.; Sabatier, L.; Walrawens, A.

    2008-08-01

    In this paper, we present a CNES participation through a case study in a research project called DOMINO financed by the French National Research Agency (ANR) RNTL. This project has started in March 2007 and will end in March 2009, it regroups academics (ENSIETA, IRISA, and IRIT), industries and agencies, (AIRBUS, CEA, CNES and SODIFRANCE). This project has two main goals: to develop reliable Model Driven Engineering (MDE) components and to build bridges with Domain Specific Languages (DSL). CNES participates in this project through a case study on the reliable design of operational procedures and associated applications. There are two main objectives for this case study: the first to improve "offline" interoperability with the possibility to build import/export tools for any scripting procedure language by using meta-modeling technology. The second is to improve efficiency for the production, validation, and execution of scripting procedures using operational specifications. It is anticipated that this will result in a reduction of costs and reliability improvement.

  10. Lornoxicam versus tramadol for post-operative pain relief in patients undergoing ENT procedures

    Directory of Open Access Journals (Sweden)

    Ashraf A Abdelhalim

    2014-01-01

    Full Text Available Background: Pain following ear-nose and throat surgery is one of the most important complaints for which, several drugs are used. This prospective, randomized, double-blind controlled trial was designed to compare the analgesic effect of tramadol versus lornoxicam for post-operative pain relief in patients undergoing ENT surgical procedures. Methods: One hundred and twenty patients of ASA class I-II, who had undergone elective ENT surgical procedures under general anesthesia, were assigned in a randomized manner into three equal groups. Group L received lornoxicam8 mg IV, Group T received tramadol 1 mg/kg IV and Group C received IV saline after induction of anesthesia before the start of the surgery. Post-operative pain was assessed using the visual analogue scale (VAS and sedation level was evaluated during stay in the post-anesthesia care unit with a four-point sedation scale. Intraoperative blood loss was estimated using the Five-Point Scale. Adverse events in the first 24 h post-operative were recorded. Results: The VAS pain scores were significantly higher in Group C as compared with those in Groups L and T at 30 min and 1, 2, 4and 6 h post-operatively, with no significant difference between Group L and Group T. The amount of morphine consumption post-operatively was significantly lower in Group L (5.2 ± 2.5 mg and Group T (5.0 ± 2.0 mg as compared with that in Group C (7.4 ± 2.3 mg (P = 0.001. The time for the first analgesic requirement was significantly less in Group L (92.62 ± 24.23 min and Group T (88 ± 21.43 min as compared with that in Group C (42.82 ± 25.61 min, with no significant difference between the other two groups. Estimated intraoperative blood loss score by the surgeons showed no significant difference between the three groups. The most frequent side-effects in the three groups were nausea and vomiting, and their incidence was significantly higher in the placebo group as compared with the other two groups. Conclusion

  11. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  12. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... STAR test procedures reference industry test procedures for fluorescent, high-intensity discharge and... unit consisting of a fluorescent lamp or lamps, together with parts designed to distribute the light... for the high-intensity discharge (HID) lamps determination arguing that ``industry believes that the...

  13. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  14. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Parts 429 and 430 RIN 1904-AB78 Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY... supplemental notice of proposed rulemaking (SNOPR) to amend the test procedures for microwave ovens. That SNOPR... for measuring the standby mode and off mode energy use of products that combine a microwave oven with...

  15. 47 CFR 15.32 - Test procedures for CPU boards and computer power supplies.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Test procedures for CPU boards and computer... FREQUENCY DEVICES General § 15.32 Test procedures for CPU boards and computer power supplies. Power supplies and CPU boards used with personal computers and for which separate authorizations are required to be...

  16. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... the energy use associated with making ice with an automatic icemaker. If adopted, that procedure would... Testing 17. Other Minor Corrections 18. Relocation of Shelving for Temperature Sensors D. Other Matters... Freezer Ice Making Energy Test Procedure, Revision 1.0--12/14/11,\\2\\ No. 4) Subsequently, consistent with...

  17. 77 FR 1591 - Energy Conservation Program: Test Procedure for Automatic Commercial Ice Makers

    Science.gov (United States)

    2012-01-11

    ... stirring Location of temperature sensor in the ice bucket Variation in ambient conditions Difference...-AC38 Energy Conservation Program: Test Procedure for Automatic Commercial Ice Makers AGENCY: Office of... (NOPR) to amend the test procedure for automatic commercial ice makers (ACIM). That NOPR serves as the...

  18. 78 FR 7939 - Energy Conservation Program: Test Procedures for Microwave Ovens (Active Mode)

    Science.gov (United States)

    2013-02-04

    ... 430 Energy Conservation Program: Test Procedures for Microwave Ovens (Active Mode); Proposed Rule #0... Conservation Program: Test Procedures for Microwave Ovens (Active Mode) AGENCY: Office of Energy Efficiency and... mode energy use for microwave ovens, including both microwave-only ovens and convection microwave ovens...

  19. 75 FR 37593 - Energy Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room...

    Science.gov (United States)

    2010-06-29

    ... Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products: Test Procedures for Clothes... Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room Air Conditioners AGENCY... residential clothes dryers and room air conditioners to provide for measurement of standby mode and off mode...

  20. Effect of the video output of the dental operating microscope on anxiety levels in a pediatric population during restorative procedures

    Directory of Open Access Journals (Sweden)

    Abrar Sayed

    2016-01-01

    Full Text Available Background: Adapting a child to the alien settings of a dental operatory is a major challenge to the dentist. Fear of the unknown and preconceived notions of dental pain causes anxiety in the pediatric patient. This often leads to disruptive and uncooperative behavior in the dental operatory. Many methods of behavior management have been described, of which the Tell-Show-Do (TSD is an established and time-tested technique of behavior management. Aim: To determine if a live visual output of the dental operating microscope (DOM could be used as an adjunct to the TSD technique, to involve the child more completely in the procedure and reduce the fear of the unknown. Materials and Methods: The study was a randomized, controlled, crossover, and cross-sectional clinical trial. Data were obtained from two visits. 90 children having carious lesions on both lower first molars, in the 7-9 years age group were selected and divided randomly into two groups. Restorative procedures were performed on one tooth per visit, with visits 1 week apart. Live display of the procedure was shown to the patient using video output of the DOM displayed on a 72 inch LCD monitor, angled for best visibility of the child. Anxiety levels were evaluated using Venhams picture selection test and pulse oximetry. Statistical Analysis: Student′s t-test was used to compare the anxiety scores obtained from the two groups. Results: The results showed there was a decrease in the anxiety from the first visit to the second visit. (P = 0.05 for Group A and P = 0.003 for Group B. The patients preferred the visit in which the DOM was used. The operator reported an increased patient compliance and reduced patient movement in the visits in which the DOM was used. Conclusion: There is a reduction in anxiety from the first visit to the second visit for restorative treatment when the DOM is used.

  1. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  2. The study features of test procedures of students' knowledge on the physical training lessons

    Directory of Open Access Journals (Sweden)

    Korobejnik V.A.

    2013-09-01

    Full Text Available The aim is to determine the significance of the relationship and special professional skills necessary to detect and correct errors and evaluating students in physical education classes. The surveys were a group of qualified teachers (n = 31 with different pedagogical experience. Each teacher was asked to arrange the professional quality of the places from 1 to 10. It was found that all investigated have a certain quality and a high level of relationship, but they are manifested in different periods of teaching. It is shown that the process of organizing and carrying out checks of expertise includes logically related mental operations which are the basis of test procedures of students' knowledge on the physical training lessons. Found that the most weighty qualities were related to skills: a rating, comment exposed estimate visually identify the error and determine its significance.

  3. 16 CFR 1700.20 - Testing procedure for special packaging.

    Science.gov (United States)

    2010-01-01

    ..., the tester shall say, “PLEASE EMPTY THE (PILLS, TABLETS, CONTENTS, etc.) INTO THIS CONTAINER.” After..., “PLEASE EMPTY THE (PILLS, TABLETS, CONTENTS, etc.) INTO THIS CONTAINER.” After the participant opens the... by the numerical designations for month, day, and year (e.g., test date: 8/3/1990; birth date: 6/23...

  4. 16 CFR 1633.7 - Mattress test procedure.

    Science.gov (United States)

    2010-01-01

    ... still frame camera so as to have (when the lens is zoomed out) just slightly more than a full-length... for still frame within its recorded field of view (preferably built into the camera). For the room... calorimeter. Figure 1 of this part shows the test assembly atop a bed frame and catch surface. The specimen...

  5. 47 CFR 11.61 - Tests of EAS procedures.

    Science.gov (United States)

    2010-10-01

    ... EOM Codes: (A) Analog and digital AM, FM, and TV broadcast stations must conduct tests of the EAS... transmitted within 60 minutes of receipt by EAS Participants in an EAS Local Area or State. Analog and digital class D non-commercial educational FM and analog and digital LPTV stations are required to transmit only...

  6. Start-Stop Test Procedures on the PEMFC Stack Level

    DEFF Research Database (Denmark)

    Mitzel, Jens; Nygaard, Frederik; Veltzé, Sune

    The test is addressed to investigate the influence on stack durability of a long stop followed by a restart of a stack. Long stop should be defined as a stop in which the anodic compartment is fully filled by air due to stack leakages. In systems, leakage level of the stack is low and time to fil...

  7. 40 CFR 63.180 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... emission test using the techniques specified in § 63.11(b)(4). (2) Determine the net heating value of the..., psig/hr. Pf=Final pressure, psig. Pi=Initial pressure, psig. tf−ti=Elapsed time, hours. (4) The...

  8. 40 CFR 63.1257 - Test methods and compliance procedures.

    Science.gov (United States)

    2010-07-01

    .... (C) The span value of the analyzer must be less than 100 ppmv. (7) Testing conditions for continuous... below the values defining Group 1 storage vessels specified in table 5 or table 6 of this subpart” is... = ideal gas law constant T = temperature of the vessel vapor space; absolute Pi = partial pressure of the...

  9. A Test Procedure for Determining Models of LV Equipment

    NARCIS (Netherlands)

    Cuk, Vladimir; Cobben, Joseph F.G.; Kling, Wil L.; Timens, R.B.; Leferink, Frank Bernardus Johannes

    2009-01-01

    An automated test technique for determining parameters of low voltage equipment is presented in the paper. The aim of this research is to obtain simple models of household, office and industrial equipment which could be used to predict power quality problems during the design of low voltage

  10. Standard-C hydrogen monitoring system acceptance test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1994-09-02

    The primary function of the standard-C hydrogen monitoring system (SHMS) is to monitor specifically for hydrogen in the waste tank atmosphere which may also contain (but not be limited to) unknown quantities of air, nitrous oxide, ammonia, water vapor, carbon dioxide, carbon monoxide, and other gaseous constituents. The SHMS will consist of hydrogen specific monitors, a grab sampler to collect samples for laboratory analysis, a gas chromatograph, and the gas sample collection system necessary to support the operation of the instrumentation. This system will be located in a cabinet placed at the tank of interest. The purpose of this document is to demonstrate that the SHMS is constructed as intended by design.

  11. LHC Magnet Tests Operational Techniques and Empowerment for Successful Completion

    CERN Document Server

    Chohan, V; Priestnall, K; Pirotte, F; Veyrunes, E; Ali, N; Awale, P; Bahuguna, S; Bhunia, U; Chauhan, V; Dixit, M; Gore, J; John, J; Kandaswamy, E; Kasbekar, A; Kashyap, P; Kasliwal, A; Kulkarni, C; Laddha, A; Malhotra, S; Mascarenhas, M; Mishra, J; Motiwala, P; Nair, K; Narayanan, R; Padmakumar, S; Pagare, A; Peruppayikkad, D; Raghunathan, S; Rao, S; Roy, D; Sharma, S; Shimjith, S; Singh, S; Sonnis, S; Sridhar, S; Surendran, P; Tikaria, A

    2007-01-01

    The LHC magnet tests operation team developed various innovative techniques, particularly since early 2004, to complete the superconductor magnet tests by Feb. 2007. Overall and cryogenic priority handling, rapid on-bench thermal cycling, rule-based goodness evaluation on round-the-clock basis, multiple, mashed web systems are some of these techniques applied with rigour for successful tests completion in time. This paper highlights these operation empowerment tools which had a pivotal role for success. A priority handling method was put in place to enable maximum throughput from twelve test benches, having many different constraints. For the cryogenics infrastructure, it implied judicious allocation of limited resources to the benches. Rapid On-Bench Thermal Cycle was a key strategy to accelerate magnets tests throughput, saving time and simplifying logistics. First level magnet appraisal was developed for 24 hr decision making so as to prepare a magnet further for LHC or keep it on standby. Web based system...

  12. Operational results of pilot cell test with cermet ``inert`` anodes

    Energy Technology Data Exchange (ETDEWEB)

    Alcorn, T.R.; Tabereaux, A.T.; Richards, N.E. [Reynolds Metals Co., Muscle Shoals, AL (United States). Mfg. Technology Lab.; Windisch, C.F. Jr.; Strachan, D.M. [Pacific Northwest Lab., Richland, WA (United States); Gregg, J.S.; Frederick, M.S. [ELTECH Research Corp., Fairport Harbor, OH (United States)

    1993-02-01

    The operational performance of a ``six-pack`` of cermet anodes and corrosion rates was evaluated in a six kA pilot reduction cell at Reynolds` Manufacturing Technology Laboratory. Two separate test periodswere conducted with the cermet anodes; the first period was in conjunction with the Pacific Northwest Laboratory and the second with ELTECH Research Corporation. Both tests used identical NiO-NiFe{sub 2}O{sub 4}-Cu anodes manufactured by Ceramic Magnetics, Inc.. The ELTECH testing involved the in situ coating of the anodes with cerium oxide. Primary evaluations for both test periods were conducted at target conditions of alumina saturation and 0.5 amp/cm{sup 2} anode current density. Individual anodes remained in operation for 25 days during the two and one-half month testing period. Operational difficulties developed throughout the test due to breakage of the anode conductor stems, cracking and breaking of the cermet anodes, unequal anode current distribution, and alumina muck build-up in the cell. These operational problems are discussed as well as an estimate of anode corrosion rates based on metal impurity levels in the aluminum metal pad.

  13. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  14. Tear Cytokine Profile as a Noninvasive Biomarker of Inflammation for Ocular Surface Diseases: Standard Operating Procedures

    Science.gov (United States)

    Wei, Yi; Gadaria-Rathod, Neha; Epstein, Seth; Asbell, Penny

    2013-01-01

    Purpose. To provide standard operating procedures (SOPs) for measuring tear inflammatory cytokine concentrations and to validate the resulting profile as a minimally invasive objective metric and biomarker of ocular surface inflammation for use in multicenter clinical trials on dry eye disease (DED). Methods. Standard operating procedures were established and then validated with cytokine standards, quality controls, and masked tear samples collected from local and distant clinical sites. The concentrations of the inflammatory cytokines in tears were quantified using a high-sensitivity human cytokine multiplex kit. Results. A panel of inflammatory cytokines was initially investigated, from which four key inflammatory cytokines (IL-1β, IL-6, INF-γ, and TNF-α) were chosen. Results with cytokine standards statistically satisfied the manufacturer's quality control criteria. Results with pooled tear samples were highly reproducible and reliable with tear volumes ranging from 4 to 10 μL. Incorporation of the SOPs into clinical trials was subsequently validated. Tear samples were collected at a distant clinical site, stored, and shipped to our Biomarker Laboratory, where a masked analysis of the four tear cytokines was successfully performed. Tear samples were also collected from a feasibility study on DED. Inflammatory cytokine concentrations were decreased in tears of subjects who received anti-inflammatory treatment. Conclusions. Standard operating procedures for human tear cytokine assessment suitable for multicenter clinical trials were established. Tear cytokine profiling using these SOPs may provide objective metrics useful for diagnosing, classifying, and analyzing treatment efficacy in inflammatory conditions of the ocular surface, which may further elucidate the mechanisms involved in the pathogenesis of ocular surface disease. PMID:24204044

  15. W-026 integrated engineering cold run operational test report for balance of plant (BOP)

    Energy Technology Data Exchange (ETDEWEB)

    Kersten, J.K.

    1998-02-24

    This Cold Run test is designed to demonstrate the functionality of systems necessary to move waste drums throughout the plant using approved procedures, and the compatibility of these systems to function as an integrated process. This test excludes all internal functions of the gloveboxes. In the interest of efficiency and support of the facility schedule, the initial revision of the test (rev 0) was limited to the following: Receipt and storage of eight overpacked drums, four LLW and four TRU; Receipt, routing, and staging of eleven empty drums to the process area where they will be used later in this test; Receipt, processing, and shipping of two verification drums (Route 9); Receipt, processing, and shipping of two verification drums (Route 1). The above listed operations were tested using the rev 0 test document, through Section 5.4.25. The document was later revised to include movement of all staged drums to and from the LLW and TRU process and RWM gloveboxes. This testing was performed using Sections 5.5 though 5.11 of the rev 1 test document. The primary focus of this test is to prove the functionality of automatic operations for all mechanical and control processes listed. When necessary, the test demonstrates manual mode operations as well. Though the gloveboxes are listed, only waste and empty drum movement to, from, and between the gloveboxes was tested.

  16. Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan Colon Container Terminal (CCT) Panama

    Energy Technology Data Exchange (ETDEWEB)

    Newhouse, Robert N.

    2010-01-01

    Report on the Operational Testing and Evaluation to validate and baseline an operable system that meets the Second Line of Defense (SLD) mission requirements. An SLD system is defined as the detection technology and associated equipment, the system operators from the host country, the standard operating procedures (SOPs), and other elements such as training and maintenance which support long-term system sustainment. To this end, the activities conducted during the OT&E phase must demonstrate that the Megaports System can be operated effectively in real-time by Panama Direccion General de Aduanas (DGA Panama Customs) personnel to the standards of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA).

  17. Radiation exposure to operating room personnel and patients during endovascular procedures.

    Science.gov (United States)

    Mohapatra, Abhisekh; Greenberg, Roy K; Mastracci, Tara M; Eagleton, Matthew J; Thornsberry, Brett

    2013-09-01

    To characterize radiation exposure to patients and operating room personnel during fluoroscopic procedures. Patient dose information was collected from the imaging equipment. Real-time dosimetry was used to measure doses to the operators, scrub nurse, radiologic technologist (RT), and anesthesiologist in 39 cases of endovascular thoracoabdominal aortic aneurysm repair using fenestrated endografts. Overall equivalent doses and dose rates at time points of interest were noted and compared with the corresponding patient doses. The dosimeter on the anesthesia equipment received 143 μSv (38-247) more radiation per case than the average operator, and the scrub nurse and RT received 106 μSv (66-146) and 100 μSv (55-145) less, respectively. Adjusting for protective lead aprons by the Webster methodology, the average operator received an effective dose of 38 μSv. Except for the RT, personnel doses were well correlated with patient dose as measured by kerma area product (KAP) (r = .82 for average operator, r = .85 for scrub nurse, and r = .86 for anesthesia; all P operator was 1.78 (1.37-2.31) times as high in a lateral projection as in a posterior-anterior projection. Personnel doses were best correlated with KAP and less well correlated with fluoroscopy time or CAK. The dosimeter on the anesthesia equipment recorded the highest doses attributable to ineffective shielding. Operators can reduce the effective dose to themselves, the patient, and other personnel by minimizing the use of digital subtraction acquisitions, avoiding lateral angulation, using higher magnification levels when possible, and being diligent about the use of shielding during fluoroscopy cases. Copyright © 2013. Published by Mosby, Inc.

  18. Extended device profiles and testing procedures for the approval process of integrated medical devices using the IEEE 11073 communication standard.

    Science.gov (United States)

    Janß, Armin; Thorn, Johannes; Schmitz, Malte; Mildner, Alexander; Dell'Anna-Pudlik, Jasmin; Leucker, Martin; Radermacher, Klaus

    2018-02-23

    Nowadays, only closed and proprietary integrated operating room systems (IORS) from big manufacturers are available on the market. Hence, the interconnection of components from third-party vendors is only possible with increased time and costs. In the context of the German Federal Ministry of Education and Research (BMBF)-funded project OR.NET (2012-2016), the open integration of medical devices from different manufacturers was addressed. An integrated operating theater based on the open communication standard IEEE 11073 shall give clinical operators the opportunity to choose medical devices independently of the manufacturer. This approach would be advantageous especially for hospital operators and small- and medium-sized enterprises (SME) of medical devices. Actual standards and concepts regarding technical feasibility and the approval process do not cope with the requirements for a modular integration of medical devices in the operating room (OR), based on an open communication standard. Therefore, innovative approval strategies and corresponding certification and test procedures, which cover actual legal and normative standards, have to be developed in order to support the future risk management and the usability engineering process of open integrated medical devices in the OR. The use of standardized device and service profiles and a three-step testing procedure, including conformity, interoperability and integration tests are described in this paper and shall support the manufacturers to integrate their medical devices without disclosing the medical devices' risk analysis and related confidential expertise or proprietary information.

  19. Operational Test Report (OTR) for U-102 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-19 and Rev. A-20). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-102. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).

  20. Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).

  1. Operational Test Report (OTR) for U-105 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-18). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-105. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).

  2. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    Science.gov (United States)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  3. Importance Of Penetration Testing For Legacy Operating System

    Directory of Open Access Journals (Sweden)

    Poorvi Bhatt

    2017-12-01

    Full Text Available Penetration testing is very important technique to find vulnerabilities in commercial networks. There are various techniques for ethical hacking via penetration testing. This report explains a white hat hacker approach of penetration testing. I have performed this test on private network where three PCs are connected through LAN via switch and without firewall. This network is not connected with Internet. All the PCs have windows operating system. The attacker host has windows server 2003 with Service Pack1 second host has windows XP with Service Pack 2 and third host has windows 2000 with service pack 4.

  4. Operational circular No.10 – Principles and procedures governing investigation of fraud

    CERN Multimedia

    2013-01-01

    Operational Circular No. 10 entitled “Principles and procedures governing investigation of Fraud”, approved by the Director-General following discussion at the Standing Concertation Committee meeting of 4 December 2012 and entering into force on 1 January 2013, is available on the intranet site of the Human Resources Department.   This circular is applicable to all persons working at or on behalf of CERN. The purpose of this new operational circular is to specify the definition of fraud and to lay down the Organization’s fraud investigation process pursuant to the CERN Anti-fraud Policy and in accordance with the principles of due process. Department Head Office HR Department

  5. Behavioral observations and operant procedures using microwaves as a heat source for young chicks

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, W.D.; McMillan, I.; Bate, L.A.; Otten, L.; Pei, D.C.

    1986-08-01

    Four trials, using operant conditioning procedures, were conducted to study the response of chicks, housed at 16 C, to microwave or infrared heat. Microwave power density was 26 mW/cm2 in Trial 1, 13 mW/cm2 in Trial 2, and 10 mW/cm2 in Trials 3 and 4. Chicks voluntarily demanded between 28 and 63% as much heat (min heat/hr) from microwave source as from infrared source at all power densities. There was no correlation, however, between the ratio of heat demanded and the power density used. There were no significant differences in growth between infrared- or microwave-heated chicks. It is evident from these studies that 8-day-old broiler chicks are capable of associating the performance of a task with a thermal reward provided by the microwaves. They are also able to utilize these microwaves through operant conditioning without any visible detrimental effect to their health or behavior.

  6. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... in step 1.c. h. The replacement cap and/or rotor must be free of any visual cracks, arcing or melting... flow rate See note (2) See note (1). Total hydrocarbons See note (3) See note (3). Carbon monoxide 1.0... exhaust hydrocarbons. (i) LOT tests shall be conducted by exposing the converter to a step change in...

  7. Neurophysiological tests and neuroimaging procedures in non-acute headache

    DEFF Research Database (Denmark)

    Sandrini, G; Friberg, L; Jänig, W

    2004-01-01

    be recommended as clinical diagnostic tests. 5 In adult and paediatric patients with migraine, with no recent change in attack pattern, no history of seizures, and no other focal neurological signs or symptoms, the routine use of neuroimaging is not warranted. In patients with atypical headache patterns......, a history of seizures and/or focal neurological signs or symptoms, magnetic resonance imaging (MRI) may be indicated. 6 If attacks can be fully accounted for by the standard headache classification [International Headache Society (IHS)], a positron emission tomography (PET) or single-photon emission...... computerized tomography (SPECT) and scan will generally be of no further diagnostic value. 7 Nuclear medicine examinations of the cerebral circulation and metabolism can be carried out in subgroups of headache patients for diagnosis and evaluation of complications, when patients experience unusually severe...

  8. 40 CFR 91.116 - Certification procedure-test engine selection.

    Science.gov (United States)

    2010-07-01

    ...-specific fuel consumption over the appropriate engine test cycle. (c) The test engine must be constructed... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Certification procedure-test engine... Certification Provisions § 91.116 Certification procedure—test engine selection. (a) The manufacturer must...

  9. 40 CFR 86.157-98 - Refueling test procedures for liquefied petroleum gas-fueled vehicles.

    Science.gov (United States)

    2010-07-01

    ... Light-Duty Trucks and New Otto-Cycle Complete Heavy-Duty Vehicles; Test Procedures § 86.157-98 Refueling... shall be performed for each fuel tank. (e) Records required. (1) Test: test number, system or device... total refueling mass emissions by the total gallons of fuel dispensed in the refueling test (see...

  10. Acceptance test procedure for the 105-KW isolation barrier leak rate

    Energy Technology Data Exchange (ETDEWEB)

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  11. An empirical test of the independence between declarative and procedural working memory in Oberauer's (2009) theory.

    Science.gov (United States)

    Barrouillet, Pierre; Corbin, Lucie; Dagry, Isabelle; Camos, Valérie

    2015-08-01

    It has recently been suggested that working memory could be conceived as two symmetrical subsystems with analogous structure and processing principles: a declarative working memory storing objects of thought available for cognitive operations, and a procedural working memory holding representations of what to do with these objects (Oberauer, Psychology of learning and motivation 51: 45-100, 2009). Within this theoretical framework, the two subsystems are thought to be independent and fueled by their own capacity. The present study tested this hypothesis through two experiments using a complex span task in which participants were asked to maintain consonants for further recall while performing response selection tasks. In line with Oberauer's conception, the load of the procedural working memory was varied by manipulating the number of stimulus-response mappings of the response selection task. Increasing the number of these mappings had a strong detrimental effect on recall performance. Besides contradicting Oberauer's proposal, this finding supports models that assume a resource-sharing between processing and storage in working memory.

  12. Procedural Tests of Anti-G Protective Devices. Volume I. Procedural Tests for Anti-G Valves

    Science.gov (United States)

    1979-12-01

    20 3.7 Data Collection Station Preamplifiers . . . .I-. - . . • 21 3.8 Strip-chart Recorders ...... ............ DC* 7A" ....... . . . . . 21 3.9...167 FIGURES Figure No. I SVT ? open-flow configuration .............. ........................... 10 2 SVTP dynamic test configuration... third set of SACM’s is run with a maximum suit volume (14 liters) and the minimum source pressure; the fourth set, with the minimum suit volume (6

  13. Aortic root reimplantation procedure: a new milestone in aortic valve-sparing operations

    Directory of Open Access Journals (Sweden)

    А. М. Чернявский

    2016-08-01

    Full Text Available Aim: Emphasis in this study was placed on clinical and functional assessment of a modified "Florida Sleeve" procedure during surgical correction of ascending aorta aneurysms with concomitant aortic insufficiency.Methods: 32 patients with an aneurysm of the ascending aorta and aortic insufficiency underwent a modified "Florida Sleeve" procedure. The average follow-up was 17 (0-60 months. The average age of patients was 57±13 (23-73 years 56±13 years.Results: The expected 4-year cumulative survival rate was 84.3%. Overall freedom from aortic insufficiency in the late period was 88.9%. Median aortic regurgitation was 1+ (1; 2. Long-term follow-up revealed no valve-associated complications.Conclusion: The aortic root reimplantation procedure enables optimal correction of the existing lesions of the aortic root without performing aortic valve replacement and demonstrates stable clinical and functional outcomes in the long-term period.Key words: aortic aneurysm; aortic valve; valve-sparing operations.FundingThe study had no sponsorship.Conflict of interestThe authors declare no conflict of interest.

  14. Standard operating procedures for female orgasmic disorder: consensus of the International Society for Sexual Medicine.

    Science.gov (United States)

    Laan, Ellen; Rellini, Alessandra H; Barnes, Tricia

    2013-01-01

    As the field of sexual medicine evolves, it is important to continually improve patient care by developing contemporary "standard operating procedures" (SOPs), reflecting the consensus view of experts in sexual medicine. Few, if any, consensus SOPs have been developed for the diagnosis and treatment of Female Orgasmic Disorder (FOD). The objective is to provide standard operating procedures for FOD. The SOP Committee was composed of a chair, selected by the International Society for the Study of Sexual Medicine, and two additional experts. To inform its key recommendations, the Committee used systematic reviews of available evidence and discussions during a group meeting, conference calls and e-mail communications. The Committee received no corporate funding or remuneration. A total of 12 recommendations for the assessment and treatment of FOD were generated, including suggestions for further research. Evidence-based, practice recommendations for the treatment of FOD are provided that will hopefully inform clinical decision making for those treating this common condition. © 2012 International Society for Sexual Medicine.

  15. An analysis of traditional operational testing to project how testing will be conducted in the future

    OpenAIRE

    Turner, Lawrence L.

    1993-01-01

    Approved for public release; distribution is unlimited The purpose of this thesis is to analyze current operational testing and to alert the reader to how testing will be conducted in the future. This analysis is conducted from a tester's point of view and is targeted at program offices so that Program Managers will be able to ensure that beneficial operational testing is conducted on their programs. The thesis also provides a detailed description of current and future systems used to inst...

  16. SSPS results of test and operation, 1981-1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1985-05-01

    The results of three years of testing and operation of the two dissimilar solar thermal power plants of the SSPS project are summarized. The project includes: (1) a Distributed Collector System, and (2) a Central Receiver System. Environmental conditions are presented and an economical assessment of the project is provided. (BCS)

  17. Test procedures and instructions for Hanford tank waste supernatant cesium removal

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

  18. Test procedures and instructions for Hanford complexant concentrate supernatant cesium removal using CST

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W.

    1997-01-08

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Complexant Concentrate supernatant liquor from tank 241-AN-107, in a bench-scale column. The cesium sorbent to be tested is crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-023, Hanford Complexant Concentrate Supernatant Cesium Removal Test Plan.

  19. Aquifer test plan for the 100-HR-3 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Swanson, L.C.; Hartman, M.J.

    1994-03-28

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues.

  20. Gastric emptying after a new, more physiological anti-obesity operation: the Magenstrasse and Mill procedure

    Energy Technology Data Exchange (ETDEWEB)

    Carmichael, A.R.; Johnston, D.; Barker, M.C.J.; Bury, R.F.; Boyce, J.; Sue-Ling, H. [Leeds General Infirmary (United Kingdom)

    2001-09-01

    The Magenstrasse and Mill (M and M) procedure for obesity is designed to preserve normal gastric emptying mechanisms. The hypothesis investigated in this study was that gastric emptying would be normal after the M and M gastroplasty. Gastric emptying studies were performed using both liquid and solid test meals, in ten morbidly obese patients (MO group) and in 13 patients after the M and M procedure (MM group). Seven people of normal weight served as controls and were matched for age, sex and height to the M and M and MO groups. Three years after the M and M procedure, mean (SD) weight loss was 42 (19) kg, with a mean loss of excess weight of 58% (20%). Gastric emptying half-times (t{sub 1/2}) are expressed in minutes, as median values (25th and 75th percentiles). The t{sub 1/2} for solids was 97 (85-110) min in the control group, 140 (86-220) min in the MO group and 79 (46-150) min in the MM group. Median gastric emptying for solids was 0.7% (0.6%-0.8%) per minute in the control group, 0.5% (0.3%-0.8%) in the MO group and 0.9% (0.4%-1.4%) in the M and M group. There were no statistically significant differences in the emptying times of the three groups. It is concluded that the M and M procedure achieves acceptable weight loss, while preserving gastric emptying mechanisms and thus minimising possible side-effects such as vomiting, dumping and diarrhoea, which are common complications of gastric bypass procedures. (orig.)

  1. Using Operational Analysis to Improve Access to Pulmonary Function Testing

    Directory of Open Access Journals (Sweden)

    Ada Ip

    2016-01-01

    Full Text Available Background. Timely pulmonary function testing is crucial to improving diagnosis and treatment of pulmonary diseases. Perceptions of poor access at an academic pulmonary function laboratory prompted analysis of system demand and capacity to identify factors contributing to poor access. Methods. Surveys and interviews identified stakeholder perspectives on operational processes and access challenges. Retrospective data on testing demand and resource capacity was analyzed to understand utilization of testing resources. Results. Qualitative analysis demonstrated that stakeholder groups had discrepant views on access and capacity in the laboratory. Mean daily resource utilization was 0.64 (SD 0.15, with monthly average utilization consistently less than 0.75. Reserved testing slots for subspecialty clinics were poorly utilized, leaving many testing slots unfilled. When subspecialty demand exceeded number of reserved slots, there was sufficient capacity in the pulmonary function schedule to accommodate added demand. Findings were shared with stakeholders and influenced scheduling process improvements. Conclusion. This study highlights the importance of operational data to identify causes of poor access, guide system decision-making, and determine effects of improvement initiatives in a variety of healthcare settings. Importantly, simple operational analysis can help to improve efficiency of health systems with little or no added financial investment.

  2. 10 CFR 431.444 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.444 Section 431.444 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... procedures for the measurement of energy efficiency. (a) Scope. Pursuant to section 346(b)(1) of EPCA, this...

  3. 75 FR 57556 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... amendments are based on recent data that more accurately describe current consumer behavior and updated... Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products: Test Procedure for Residential...

  4. 75 FR 57555 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... amendments are based on recent data that more accurately describe current consumer behavior and updated... Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products: Test Procedure for Residential...

  5. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  6. 76 FR 31749 - Energy Conservation Program for Certain Consumer Appliances: Test Procedures for Battery Chargers...

    Science.gov (United States)

    2011-06-01

    ... world-wide to measure battery charger energy consumption--the EPA-developed procedure used for ENERGY..., DOE is inserting a new active mode energy consumption test procedure for battery chargers, which is... may not make any representation regarding battery charger or external power supply energy consumption...

  7. 76 FR 971 - Energy Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room...

    Science.gov (United States)

    2011-01-06

    ...--Clothes Dryers C. Active Mode--Room Air Conditioners V. Procedural Requirements A. Review Under Executive... Dryers and Room Air Conditioners; Final Rule #0;#0;Federal Register / Vol. 76 , No. 4 / Thursday, January... Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room Air Conditioners AGENCY...

  8. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Recommended Procedures for Conducting Skill... LOCOMOTIVE ENGINEERS Pt. 240, App. E Appendix E to Part 240—Recommended Procedures for Conducting Skill Performance Tests FRA requires (see § 240.127 and § 240.211) that locomotive engineers be given a skill...

  9. 76 FR 647 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2011-01-05

    ... Energy 10 CFR Part 431 Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors; Proposed Rule #0;#0;Federal Register / Vol. 76, No. 3 / Wednesday, January 5, 2011... Procedures for Electric Motors and Small Electric Motors AGENCY: Office of Energy Efficiency and Renewable...

  10. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...

  11. Financial Reporting Procedures for Defense Distribution Depots - Defense Logistics Agency Business Area of the Defense Business Operations Fund

    National Research Council Canada - National Science Library

    Young, Shelton

    1994-01-01

    In our audit of the FY 1993 Financial Statements for the Distribution Depots--Defense Logistics Agency Business Mea of the Defense Business Operations Fund, we evaluated procedures and controls used...

  12. Usability of Operational Performance Support Tools - Findings from Sea Test II

    Science.gov (United States)

    Byrne, Vicky; Litaker, Harry; McGuire, Kerry

    2014-01-01

    Sea Test II, aka NASA Extreme Environment Mission Operations 17(NEEMO 17) took place in the Florida Aquarius undersea habitat. This confined underwater environment provides a excellent analog for space habitation providing similarities to space habitation such as hostile environment, difficult logistics, autonomous operations, and remote communications. This study collected subjective feedback on the usability of two performance support tools during the Sea Test II mission, Sept 10-14, 2013; Google Glass and iPAD. The two main objectives: - Assess the overall functionality and usability of each performance support tool in a mission analog environment. - Assess the advantages and disadvantages of each tool when performing operational procedures and Just-In-Time-Training (JITT).

  13. Operational test report for the AY-102 Enraf densitometer control and acquisition system

    Energy Technology Data Exchange (ETDEWEB)

    Huber, J.H.

    1998-07-23

    On June 2 through June 10, 1998, the AY-102 Tank Densitometer Control and Acquisition System was operationally tested per OTP-320-01 O Revision A-O. The test was performed at the Department of Energy`s Hanford Site, 200 East Area, 241-AY Tank Farm. The test validated the functionality of the Enraf 854 ATG Densitometer Gauge and Enraf Control Panel software for use by project W-320, Waste Retrieval Sluicing System (WRSS). The purpose of the test procedure was two fold: (1) to verify the functionality of the Enraf 854 ATG as a Densitometer and (2) to verify the functionality of the Enraf Control Panel Software density acquisition routines. The densitometer was previously acceptance tested per HNF-SD-WM-ATP-077. The software was previously acceptance tested per HNF-1991.

  14. Characterization Test Procedures for Intersection Collision Avoidance Systems Based on Vehicle-to-Vehicle Communications

    Science.gov (United States)

    2015-12-01

    Characterization test procedures have been developed to quantify the performance of intersection collision avoidance (ICA) systems based on vehicle-to-vehicle communications. These systems warn the driver of an imminent crossing-path collision at a r...

  15. Preliminary operational results of the industrial process heat field tests

    Energy Technology Data Exchange (ETDEWEB)

    Kutscher, C.; Davenport, R.

    1980-04-01

    There are currently six DOE-funded solar industrial process heat (IPH) field tests which have been operational for one year or longer. These are all low temperature first generation projects which supply heat at temperatures below 100/sup 0/C - three hot water and three hot air. During the 1979 calendar year, personnel from the Solar Energy Research Institute (SERI) visited all of these sites; the performance and cost results obtained for each project and the operational problems encountered at each site are discussed.

  16. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2012-03-07

    ... dryer usage factor; and (5) replaces the current representative load size calculation in the drying... standard; (6) adds a new industry test method for measuring test cloth shrinkage; (7) adds a requirement to... specifications for the dryer to be used for bone-drying the test cloth; (10) clarifies the procedures for...

  17. 49 CFR Appendix C to Part 173 - Procedure for Base-level Vibration Testing

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Procedure for Base-level Vibration Testing C... Base-level Vibration Testing Base-level vibration testing shall be conducted as follows: 1. Three... platform. 4. Immediately following the period of vibration, each package shall be removed from the platform...

  18. Soil-contact decay tests using small blocks : a procedural analysis

    Science.gov (United States)

    Rodney C. De Groot; James W. Evans; Paul G. Forsyth; Camille M. Freitag; Jeffrey J. Morrell

    Much discussion has been held regarding the merits of laboratory decay tests compared with field tests to evaluate wood preservatives. In this study, procedural aspects of soil jar decay tests with 1 cm 3 blocks were critically examined. Differences among individual bottles were a major source of variation in this method. The reproducibility and sensitivity of the soil...

  19. 78 FR 7681 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces and...

    Science.gov (United States)

    2013-02-04

    ... of AFUE Inflation Issues Associated with Omitting Cool-Down and Heat-Up Testing for Two-Stage and... Equations to Correct Existing Test Procedure C. Results of Preliminary DOE Testing D. Proposed Corrective... 2007 did not similarly update 42 U.S.C. 6292(a)(5), it is implicit that this coverage continues to...

  20. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests...

  1. Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using Calibration Lights

    Science.gov (United States)

    2016-04-04

    Calibration Light Pole. Light poles should be erected as straight as possible (plumb). Its base must be firmly set. Where applicable, poles should...function of the Quazar** application to record the event until the projectile impacts the farthest target while monitoring the live video feedback . The

  2. On the effect of emotional states on operator thinking. [psychological test for operator selection

    Science.gov (United States)

    Solodkova, A. V.

    1975-01-01

    A combination sonic and electrical skin stimuli stress test is reported that is suitable for the psychological selection of individuals to perform operator functions. The behavior of these people is characterized by a fighting spirit, increased work capacity, minimum expenditure of strength and insignificant fatigue.

  3. Colovaginal anastomosis: an unusual complication of stapler use in restorative procedure after Hartmann operation

    Directory of Open Access Journals (Sweden)

    Liao Guoqing

    2005-11-01

    Full Text Available Abstract Background Rectovaginal fistula is uncommon after lower anterior resection for rectal cancer. The most leading cause of this complication is involvement of the posterior wall of the vagina into the staple line when firing the circular stapler. Case presentation A 50-year-old women underwent resection for obstructed carcinoma of the sigmoid colon with Hartmann procedure. Four months later she underwent restorative surgery with circular stapler. Following which she developed rectovaginal fistula. A transvaginal repair was performed but stool passing from vagina not per rectum. Laporotomy revealed colovaginal anastomosis, which was corrected accordingly. Patient had an uneventful recovery. Conclusion Inadvertent formation of colovaginal anastomosis associated with a rectovaginal fistula is a rare complication caused by the operator's error. The present case again highlights the importance of ensuring that the posterior wall of vagina is away from the staple line.

  4. Standardization of the Action Verbs used in Emergency Operating Procedures of NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Tong Il; Lee, Yong Hee; Park, Jae Chang [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Jeong, Yeon Seop; Chu, Gang Il [Korea Hydro and Nuclear Power, Daejeon (Korea, Republic of)

    2010-05-15

    The action verbs used in Emergency Operating Procedures (EOPs) for each nuclear power plant are translated respectively from the action verbs used in Emergency Recovery Guidelines (ERG) of the reference plants. The action verbs used in each plant are not largely different with one another. There are, however, some cases that the meanings of the same action verbs used in different plants are not consistent with each other and translations are not exact. In this study, the original English expressions of the action verbs and the translated verbs were compared and their accepted meanings analyzed. And then, standardization for the action verbs which are not exactly translated or which are used with different meanings among the plants was proposed

  5. Testing single point incremental forming moulds for rotomoulding operations

    Science.gov (United States)

    Afonso, Daniel; de Sousa, Ricardo Alves; Torcato, Ricardo

    2017-10-01

    Low pressure polymer processes as thermoforming or rotational moulding use much simpler moulds than high pressure processes like injection. However, despite the low forces involved in the process, moulds manufacturing for these applications is still a very material, energy and time consuming operation. Particularly in rotational moulding there is no standard for the mould manufacture and very different techniques are applicable. The goal of this research is to develop and validate a method for manufacturing plastically formed sheet metal moulds by single point incremental forming (SPIF) for rotomoulding and rotocasting operations. A Stewart platform based SPIF machine allow the forming of thick metal sheets, granting the required structural stiffness for the mould surface, and keeping a short manufacture lead time and low thermal inertia. The experimental work involves the proposal of a hollow part, design and fabrication of a sheet metal mould using dieless incremental forming techniques and testing its operation in the production of prototype parts.

  6. A testing procedure for triaxial tests and a numerical method for the calculation of powder flow properties

    NARCIS (Netherlands)

    Eelkman Rooda, J.; Haaker, G.

    1977-01-01

    A testing procedure for measuring flow properties of powders is developed which makes it possible to use results from triaxial tests in the Jenike bin theory. For the elaboration of the results a numerical method is used, based upon the Warren Spring equation (τ/C)N = (σ + T)/T. In this equation σ

  7. Receiver operating characteristic curve in diagnostic test assessment.

    Science.gov (United States)

    Mandrekar, Jayawant N

    2010-09-01

    The performance of a diagnostic test in the case of a binary predictor can be evaluated using the measures of sensitivity and specificity. However, in many instances, we encounter predictors that are measured on a continuous or ordinal scale. In such cases, it is desirable to assess performance of a diagnostic test over the range of possible cutpoints for the predictor variable. This is achieved by a receiver operating characteristic (ROC) curve that includes all the possible decision thresholds from a diagnostic test result. In this brief report, we discuss the salient features of the ROC curve, as well as discuss and interpret the area under the ROC curve, and its utility in comparing two different tests or predictor variables of interest.

  8. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  9. 40 CFR 73.18 - Submittal procedures for units commencing commercial operation during the period from January 1...

    Science.gov (United States)

    2010-07-01

    ...) Eligibility. To be eligible for allowances under this section, a unit shall commence commercial operation... construction of the unit. (c) Commencement of commercial operation. The Administrator will use EIA information... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Submittal procedures for units...

  10. A Guide for Developing Standard Operating Job Procedures for the Tertiary Multimedia Filtration Process Wastewater Treatment Facility. SOJP No. 7.

    Science.gov (United States)

    Petrasek, Al, Jr.

    This guide describes the standard operating job procedures for the tertiary multimedia filtration process of wastewater treatment plants. The major objective of the filtration process is the removal of suspended solids from the reclaimed wastewater. The guide gives step-by-step instructions for pre-start up, start-up, continuous operation, and…

  11. A Guide for Developing Standard Operating Job Procedures for the Digestion Process Wastewater Treatment Facility. SOJP No. 10.

    Science.gov (United States)

    Schwing, Carl M.

    This guide describes standard operating job procedures for the digestion process of wastewater treatment facilities. This process is for reducing the volume of sludge to be treated in subsequent units and to reduce the volatile content of sludge. The guide gives step-by-step instructions for pre-startup, startup, continuous operating, shutdown,…

  12. 30 CFR 761.15 - Procedures for waiving the prohibition on surface coal mining operations within the buffer zone...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Procedures for waiving the prohibition on surface coal mining operations within the buffer zone of an occupied dwelling. 761.15 Section 761.15... surface coal mining operations within the buffer zone of an occupied dwelling. (a) This section does not...

  13. 40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.

    Science.gov (United States)

    2010-07-01

    ... operator is not required to conduct an emission test for HCl. (f) Sweat furnace. Except as provided in § 63.1505(f)(1), the owner or operator must measure emissions of D/F from each sweat furnace at the outlet... gaseous or liquid reactive flux for the 3 test runs; (2) Record the identity, composition, and total...

  14. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  15. An operative gamma camera for sentinel lymph node procedure in case of breast cancer

    CERN Document Server

    Salvador, S; Mathelin, C; Guyonne, J; Huss, D

    2007-01-01

    Large field of view gamma cameras are widely used to perform lymphoscintigraphy in the sentinel lymph nodes (SLN) procedure in case of breast cancer. However, they are not specified for this application and their sizes do not enable their use in the operative room to control the excision of the all SLN. We present the results obtained with a prototype of a new mini gamma camera developed especially for the operative lymphoscintigraphy of the axillary area in case of breast cancer. This prototype is composed of 10 mm thick parallel lead collimator, a 2 mm thick GSO:Ce inorganic scintillating crystal from Hitachi and a Hamamatsu H8500 flat panel multianode (64 channels) photomultiplier tube (MAPMT) equipped with a dedicated electronics. Its actual field of view is 50 × 50mm2. The gamma interaction position in the GSO scintillating plate is obtained by calculating the center of gravity of the fired MAPMT channels. The measurements performed with this prototype demonstrate the usefulness of this mini gamma camer...

  16. A standard operating procedure for the surgical implantation of transmitters in juvenile salmonids

    Science.gov (United States)

    Liedtke, T.L.; Beeman, J.W.; Gee, L.P.

    2012-01-01

    Biotelemetry is a useful tool to monitor the movements of animals and is widely applied in fisheries research. Radio or acoustic technology can be used, depending on the study design and the environmental conditions in the study area. A broad definition of telemetry also includes the use of Passive Integrated Transponder (PIT) tags, either separately or with a radio or acoustic transmitter. To use telemetry, fish must be equipped with a transmitter. Although there are several attachment procedures available, surgical implantation of transmitters in the abdominal cavity is recognized as the best technique for long-term telemetry studies in general (Stasko and Pincock, 1977; Winter, 1996; Jepsen, 2003), and specifically for juvenile salmonids, Oncorhynchus spp. (Adams and others, 1998a, 1998b; Martinelli and others, 1998; Hall and others, 2009). Studies that use telemetry assume that the processes by which the animals are captured, handled, and tagged, as well as the act of carrying the transmitter, will have minimal effect on their behavior and performance. This assumption, commonly stated as a lack of transmitter effects, must be valid if telemetry studies are to describe accurately the movements and behavior of an entire population of interest, rather than the subset of that population that carries transmitters. This document describes a standard operating procedure (SOP) for surgical implantation of radio or acoustic transmitters in juvenile salmonids. The procedures were developed from a broad base of published information, laboratory experiments, and practical experience in tagging thousands of fish for numerous studies of juvenile salmon movements near Columbia River and Snake River hydroelectric dams. Staff from the Western Fisheries Research Center's Columbia River Research Laboratory (CRRL) frequently have used telemetry studies to evaluate new structures or operations at hydroelectric dams in the Columbia River Basin, and these evaluations typically

  17. Operational Testing of Satellite based Hydrological Model (SHM)

    Science.gov (United States)

    Gaur, Srishti; Paul, Pranesh Kumar; Singh, Rajendra; Mishra, Ashok; Gupta, Praveen Kumar; Singh, Raghavendra P.

    2017-04-01

    Incorporation of the concept of transposability in model testing is one of the prominent ways to check the credibility of a hydrological model. Successful testing ensures ability of hydrological models to deal with changing conditions, along with its extrapolation capacity. For a newly developed model, a number of contradictions arises regarding its applicability, therefore testing of credibility of model is essential to proficiently assess its strength and limitations. This concept emphasizes to perform 'Hierarchical Operational Testing' of Satellite based Hydrological Model (SHM), a newly developed surface water-groundwater coupled model, under PRACRITI-2 program initiated by Space Application Centre (SAC), Ahmedabad. SHM aims at sustainable water resources management using remote sensing data from Indian satellites. It consists of grid cells of 5km x 5km resolution and comprises of five modules namely: Surface Water (SW), Forest (F), Snow (S), Groundwater (GW) and Routing (ROU). SW module (functions in the grid cells with land cover other than forest and snow) deals with estimation of surface runoff, soil moisture and evapotranspiration by using NRCS-CN method, water balance and Hragreaves method, respectively. The hydrology of F module is dependent entirely on sub-surface processes and water balance is calculated based on it. GW module generates baseflow (depending on water table variation with the level of water in streams) using Boussinesq equation. ROU module is grounded on a cell-to-cell routing technique based on the principle of Time Variant Spatially Distributed Direct Runoff Hydrograph (SDDH) to route the generated runoff and baseflow by different modules up to the outlet. For this study Subarnarekha river basin, flood prone zone of eastern India, has been chosen for hierarchical operational testing scheme which includes tests under stationary as well as transitory conditions. For this the basin has been divided into three sub-basins using three flow

  18. 76 FR 59574 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2011-09-27

    ... under the DOT drug testing regulation, 49 CFR Part 40, must be collected using chain-of-custody... Alcohol Testing Programs: Federal Drug Testing Custody and Control Form; Technical Amendment AGENCY... of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the...

  19. 40 CFR 86.1111-87 - Test procedures for PCA testing.

    Science.gov (United States)

    2010-07-01

    ... measure background particulate shall void the test cycle regardless of the test results. If a test cycle... applicable: (i) The manufacturer may use gasoline test fuel meeting the specifications of paragraph (a) of... the temperature of the test fuel at other than the approximate midvolume of the fuel tank, as...

  20. Test Operations Procedure (TOP) 01-1-025 Camouflage Performance Testing Using Observers

    Science.gov (United States)

    2016-05-05

    percent of reading MacBeth Colorchecker Chart** Not applicable. Photographic gray card Not applicable. Spectralons (5 – 99 percent) ± 1 percent...having an optimally exposed image available for post processing Flash Control Flash Firing Disabled Should use natural light only Aspect Ratio 3:2...image and set the exposure level on the green channel, sampling on chip 22 (Neutral 5) of the MacBeth ColorChecker® Chart (Figure 5), to a digital

  1. 77 FR 76831 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces and...

    Science.gov (United States)

    2012-12-31

    ... over a variety of operational modes. The manufacturer is given a choice of measurement procedures... Residential Furnaces and Boilers (Standby Mode and Off Mode) AGENCY: Office of Energy Efficiency and Renewable... include provisions for measuring the standby mode and off mode energy consumption of those products, as...

  2. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  3. Presentation and comparison of damage test procedures for fused silica and KDP crystals

    Science.gov (United States)

    Lamaignère, L.; Donval, T.; Loiseau, M.; Bouillet, S.; Courchinoux, R.; Poncetta, J. C.; Bertussi, Betrand; Bercegol, H.

    2008-10-01

    A rasterscan test procedure [L. Lamaignère et al, Rev. Sci. Instrumen. 78, 103105 (2007)] has been implemented in order to determine low laser damage density of large aperture UV fused silica optics. This procedure was improved in terms of accuracy and repeatability and is now used for the determination of bulk damage density for KDP crystals. The large area (volume) scanned during tests permits to measure very low damage density. On small samples, small area are tested using the normalized 1/1 test procedure consisting on the irradiation of few sites at several fluences. The classical damage probability plot is converted in terms of damage density. The two testing procedures are complementary: the 1/1 mode is practical to test a wide fluence range while the rasterscan mode allows exploring low damage densities with higher accuracy. Tests have been carried out on several facilities using several pulse durations and spatial distributions. We describe the equipment, test procedure and data analysis to perform this damage test with small beams (Gaussian beams, about 1mm @ 1/e, and top hat beams). Then, beam overlap and beam shape are the two key parameters which are taken into account in order to determine damage density. After data analysis and treatment, a repeatable metrology has been obtained. Moreover, the consideration of error bars on defects distributions permits to compare data between these installations. This allows us to reach reproducibility, a necessary condition in order to share results and to make reliable predictions of laser damage resistance. Other tests are realized with larger beams (centimeter sized) and with a single shot. Due to a large beam contrast, a large fluence range is then covered. Then after data treatment, we find a good correlation between tests realised with small and large beams. This allows us to make tests with different laser characteristics (spectral modulations, pulse duration, laser polarisation) and then to study their

  4. Operational experience from LCLS-II cryomodule testing

    Science.gov (United States)

    Wang, R.; Hansen, B.; White, M.; Hurd, J.; Atassi, O. Al; Bossert, R.; Pei, L.; Klebaner, A.; Makara, J.; Theilacker, J.; Kaluzny, J.; Wu, G.; Harms, E.

    2017-12-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  5. Operational Experience from LCLS-II Cryomodule Testing

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Renzhuo [Fermilab; Hansen, Benjamin [Fermilab; White, Michael [Fermilab; Hurd, Joseph [Fermilab; Atassi, Omar Al [Fermilab; Bossert, Richard [Fermilab; Pei, Liujin [Fermilab; Klebaner, Arkadiy [Fermilab; Makara, Jerry [Fermilab; Theilacker, Jay [Fermilab; Kaluzny, Joshua [Fermilab; Wu, Genfa [Fermilab; Harms, Elvin [Fermilab

    2017-07-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  6. The risk of post-operative complications in psoriasis and psoriatic arthritis patients on biologic therapy undergoing surgical procedures.

    Science.gov (United States)

    Bakkour, W; Purssell, H; Chinoy, H; Griffiths, C E M; Warren, R B

    2016-01-01

    There is limited evidence as to whether biologic therapy should be stopped or continued in patients with psoriasis and/or psoriatic arthritis (PsA) who are undergoing surgical procedures. Current guidelines of care recommend a planned break from biologic therapy in those undergoing major surgical procedures. To audit current practice of managing biologic therapy peri-operatively in a tertiary referral psoriasis clinic against guidelines of care and to investigate the effects of continuing/stopping biologic therapy in psoriasis and PsA patients. A retrospective audit of psoriasis and PsA patients who had a surgical procedure whilst on biologic therapy. A proforma was used to collect information on the biologics used, whether they were stopped peri-operatively and whether patients developed post-operative complications and/or disease flare. A total of 42 patients who had 77 procedures were identified. Procedures ranged from skin surgery to orthopaedic and cardiothoracic surgery. Biologic therapy was continued in the majority of procedures (76%). There was no significant difference in post-operative risk of infection and delayed wound healing between those patients who continued and those who stopped biologic therapy, including those undergoing major surgery. Interrupting biologic therapy peri-operatively was associated with a significant (P = 0.003) risk of flare of psoriasis or PsA. Continuing biologic therapy in psoriasis and PsA patients peri-operatively did not increase the risk of post-operative complications. Interrupting biologic therapy peri-operatively significantly increased the risk of disease flare. This study is limited by cohort size and requires replication, ideally in a prospective randomized controlled manner. © 2015 European Academy of Dermatology and Venereology.

  7. 77 FR 26607 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2012-05-04

    ... finalized key provisions related to small electric motor testing in the July 2009 final rule, but opted to... for Electric Motors and Small Electric Motors; Final Rules #0;#0;Federal Register / Vol. 77, No. 87... Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors AGENCY: Office...

  8. 78 FR 38455 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-06-26

    .... DOE finalized key provisions related to small electric motor testing in a 2009 final rule at 74 FR... for Electric Motors; Proposed Rule #0;#0;Federal Register / Vol. 78, No. 123 / Wednesday, June 26... Program: Test Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy...

  9. 49 CFR 232.307 - Modification of the single car air brake test procedures.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Modification of the single car air brake test...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRAKE SYSTEM SAFETY STANDARDS FOR FREIGHT... Requirements § 232.307 Modification of the single car air brake test procedures. (a) Request. The AAR or other...

  10. 49 CFR 572.75 - Lumbar spine, abdomen, and pelvis assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Lumbar spine, abdomen, and pelvis assembly and...) ANTHROPOMORPHIC TEST DEVICES 6-Year-Old Child § 572.75 Lumbar spine, abdomen, and pelvis assembly and test procedure. (a) Lumbar spine, abdomen, and pelvis assembly. The lumbar spine, abdomen, and pelvis consist of...

  11. 76 FR 50145 - Energy Conservation Program: Test Procedures for Residential Clothes Dryers

    Science.gov (United States)

    2011-08-12

    ... final RMC, with an average RMC of 2.0 percent. In comparison, the same clothes dryer under the same cycle settings dried the DOE test load to 0.3 to 1.2 percent RMC, with an average RMC of 0.7 percent...; ] DEPARTMENT OF ENERGY 10 CFR Part 430 RIN 1904-AC63 Energy Conservation Program: Test Procedures for...

  12. 76 FR 49237 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2011-08-09

    ... representative average use cycle or period of use. Test procedures must not be unduly burdensome to conduct. (42... average standby mode and average off mode power consumption. With respect to test conditions, section 4 of... comparison periods, with stability criteria evaluated by calculating the difference in average power measured...

  13. 49 CFR 572.125 - Upper and lower torso assemblies and torso flexion test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... seated dummy is subjected to a force continuously applied at the head to neck pivot pin level through a...

  14. 49 CFR 572.135 - Upper and lower torso assemblies and torso flexion test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Upper and lower torso assemblies and torso flexion... torso assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is... upper torso assembly of a seated dummy is subjected to a force continuously applied at the head to neck...

  15. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... torso assembly of a seated dummy is subjected to a force continuously applied at the head to neck pivot...

  16. 75 FR 31223 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Central Air...

    Science.gov (United States)

    2010-06-02

    ... External Static Pressure Values 5. Fan Time Delay Relays 6. Inverter-Driven Compressors 7. Addition of... Sources of Energy Consumption During All Tests 14. Add Testing Procedures and Calculations for Off Mode... References to the Current Standards of AHRI and ASHRAE IV. Regulatory Review A. Review Under Executive Order...

  17. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... dynamometer test procedure is designed to determine the brake specific emissions of hydrocarbons, nonmethane... fuel vapors and connected to the engine. The canisters used for testing must be of the same design as... tubing from the exit of the engine exhaust manifold, turbocharger outlet or aftertreatment device to the...

  18. 77 FR 33106 - Energy Conservation Program: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2012-06-05

    ...; Individual chicken's physical activity; Genetics; and Methods of breeding and raising chickens from farm to... test method for potential amendments to the DOE test procedure. Table 2 presents the key differences..., including cooking efficiency and annual energy consumption. ] Table 2--Key Differences Between IEC Standard...

  19. 76 FR 63211 - Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating...

    Science.gov (United States)

    2011-10-12

    ...-0042] RIN 1904-AC53 Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct... energy efficiency of electric instantaneous water heaters. c. Storage Water Heaters With Very Large... Approach to Predicting the Energy Efficiency of Residential Water Heaters-- Testing of Gas Tankless and...

  20. Dynamic Sampling of Trace Contaminants During the Mission Operations Test of the Deep Space Habitat

    Science.gov (United States)

    Monje, Oscar; Valling, Simo; Cornish, Jim

    2013-01-01

    The atmospheric composition inside spacecraft during long duration space missions is dynamic due to changes in the living and working environment of crew members, crew metabolism and payload operations. A portable FTIR gas analyzer was used to monitor the atmospheric composition within the Deep Space Habitat (DSH) during the Mission Operations Test (MOT) conducted at the Johnson Space Center (JSC). The FTIR monitored up to 20 gases in near- real time. The procedures developed for operating the FTIR were successful and data was collected with the FTIR at 5 minute intervals. Not all the 20 gases sampled were detected in all the modules and it was possible to measure dynamic changes in trace contaminant concentrations that were related to crew activities involving exercise and meal preparation.

  1. Dynamic Sampling of Cabin VOCs during the Mission Operations Test of the Deep Space Habitat

    Science.gov (United States)

    Monje, Oscar; Rojdev, Kristina

    2013-01-01

    The atmospheric composition inside spacecraft is dynamic due to changes in crew metabolism and payload operations. A portable FTIR gas analyzer was used to monitor the atmospheric composition of four modules (Core lab, Veggie Plant Atrium, Hygiene module, and Xhab loft) within the Deep Space Habitat '(DSH) during the Mission Operations Test (MOT) conducted at the Johnson Space Center. The FTIR was either physically relocated to a new location or the plumbing was changed so that a different location was monitored. An application composed of 20 gases was used and the FTIR was zeroed using N2 gas every time it was relocated. The procedures developed for operating the FTIR were successful as all data was collected and the FTIR worked during the entire MOT mission. Not all the 20 gases in the application sampled were detected and it was possible to measure dynamic VOC concentrations in each DSH location.

  2. Hospital readmission after multiple major operative procedures among patients with employer provided health insurance.

    Science.gov (United States)

    Kim, Yuhree; Gani, Faiz; Canner, Joseph K; Margonis, Georgios A; Makary, Martin A; Schneider, Eric B; Pawlik, Timothy M

    2016-07-01

    Most studies report data only on readmission within 30 days of discharge from the same hospital following a single procedure. We sought to define the incidence of early versus late hospital readmission among patients undergoing multiple major operative procedures. Patients were identified using the MarketScan database from 2010-2012. Multivariable logistic regression analysis was performed to identify factors associated with early (≤30 days) versus late readmission (31-90 days) among patients who underwent multiple operative procedures. A total of 194,111 patients were identified of whom 63.2% (n = 122,660) underwent an abdominal procedure (esophagectomy, pancreatectomy, hepatectomy, colectomy, lung resection, and gastrectomy), while the remaining 71,451 (36.8%) patients underwent a cardiovascular procedure (repair of abdominal aortic aneurysm, coronary-artery bypass grafting, carotid endarterectomy, and mitral/aortic valve replacement). A total of 3,444 patients underwent >1 simultaneous procedure (abdominal: 885, 0.7%; cardiovascular: 2,559, 3.6%). The overall incidence of 90-day readmission was 15.6% (n = 30,309); 9.6% of patients were readmitted early, while 6.0% of patients were readmitted late. Readmission was higher among patients undergoing multiple procedures (21.8% vs 15.5%; P 15% of patients being readmitted within 90 days of index discharge. Compared with patients undergoing a single operative procedure, patients undergoing multiple operative procedures demonstrated an increased risk for readmission within 90 days of discharge and were more likely to be readmitted within 30 days of index discharge. Copyright © 2016 Elsevier Inc. All rights reserved.

  3. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  4. Application and testing of a procedure to evaluate transferability of habitat suitability criteria

    Science.gov (United States)

    Thomas, Jeff A.; Bovee, Ken D.

    1993-01-01

    A procedure designed to test the transferability of habitat suitability criteria was evaluated in the Cache la Poudre River, Colorado. Habitat suitability criteria were developed for active adult and juvenile rainbow trout in the South Platte River, Colorado. These criteria were tested by comparing microhabitat use predicted from the criteria with observed microhabitat use by adult rainbow trout in the Cache la Poudre River. A one-sided X2 test, using counts of occupied and unoccupied cells in each suitability classification, was used to test for non-random selection for optimum habitat use over usable habitat and for suitable over unsuitable habitat. Criteria for adult rainbow trout were judged to be transferable to the Cache la Poudre River, but juvenile criteria (applied to adults) were not transferable. Random subsampling of occupied and unoccupied cells was conducted to determine the effect of sample size on the reliability of the test procedure. The incidence of type I and type II errors increased rapidly as the sample size was reduced below 55 occupied and 200 unoccupied cells. Recommended modifications to the procedure included the adoption of a systematic or randomized sampling design and direct measurement of microhabitat variables. With these modifications, the procedure is economical, simple and reliable. Use of the procedure as a quality assurance device in routine applications of the instream flow incremental methodology was encouraged.

  5. Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.B.

    1997-01-07

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

  6. Multiple testing procedures for identifying desirable dose combinations in bifactorial designs

    Directory of Open Access Journals (Sweden)

    Buchheister, Bettina

    2006-06-01

    Full Text Available Hung, Chi, and Lipicky proposed the AVE and MAX tests to analyse in a bifactorial design whether combinations of two drugs at several doses fulfil the desirable property of superiority to both their single drug components. These are global tests and do not identify the special combinations which are more effective than their respective single components. Here multiple testing procedures based on linear contrast tests and on the closed testing principle will be presented. They will be compared with simultaneous Min tests of Laska and Meisner. The performance of these approaches is investigated by simulation studies.

  7. Fibre Laser Welding of HY-80 Steel: Procedure Development and Testing

    Science.gov (United States)

    2010-09-01

    fusion zone, but also weld procedural developments required to minimize porosity. Future plans: Tungsten inert gas ( TIG ) weld repaired threads are...Canada Fibre Laser Welding of HY-80 Steel Proceedure Development and Testing Christopher Bayley DLP Neil Aucoin DLP Xinjin Cao NRC IAR AMTC Technical...Memorandum DRDC Atlantic TM 2009-187 September 2010 This page intentionally left blank. Fibre Laser Welding of HY-80 Steel Procedure

  8. Standardised procedures can improve the validity of susceptibility testing of uropathogenic bacteria in general practice.

    Science.gov (United States)

    Bjerrum, L; Grinsted, P; Petersen, P H; Søgaard, P

    2000-12-01

    To investigate whether the validity of susceptibility testing in general practice would improve when preceded by an intervention. Instruction in standardised susceptibility testing procedures given by laboratory instructors. Urine specimens containing monocultures of typical uropathogenic bacteria were sent to 23 general practices before and after the intervention. Practices performed susceptibility testing by the Sensicult and the Iso-Res agar methods and the validity of the results before and after the intervention was compared. Results from susceptibility testing at the bacteriological laboratory, Odense University Hospital, were used as gold standard. The median frequency of correct results increased from 82% to 98% for susceptibility testing based on Sensicult (p = 0.001) and from 90% to 96% based on Iso-Res agar (p = 0.05). The validity of susceptibility testing in general practice improves when preceded by instruction in standardised procedures.

  9. Test Waveform Applications for JPL STRS Operating Environment

    Science.gov (United States)

    Lux, James P.; Peters, Kenneth J.; Taylor, Gregory H.; Lang, Minh; Stern, Ryan A.; Duncan, Courtney B.

    2013-01-01

    This software demonstrates use of the JPL Space Telecommunications Radio System (STRS) Operating Environment (OE), tests APIs (application programming interfaces) presented by JPL STRS OE, and allows for basic testing of the underlying hardware platform. This software uses the JPL STRS Operating Environment ["JPL Space Tele com - munications Rad io System Operating Environment,"(NPO-4776) NASA Tech Briefs, commercial edition, Vol. 37, No. 1 (January 2013), p. 47] to interact with the JPL-SDR Software Defined Radio developed for the CoNNeCT (COmmunications, Navigation, and Networking rEconfigurable Testbed) Project as part of the SCaN Testbed installed on the International Space Station (ISS). These are the first applications that are compliant with the new NASA STRS Architecture Standard. Several example waveform applications are provided to demonstrate use of the JPL STRS OE for the JPL-SDR platform used for the CoNNeCT Project. The waveforms provide a simple digitizer and playback capability for the SBand RF slice, and a simple digitizer for the GPS slice [CoNNeCT Global Positioning System RF Module, (NPO-47764) NASA Tech Briefs, commercial edition, Vol. 36, No. 3 (March 2012), p. 36]. These waveforms may be used for hardware test, as well as for on-orbit or laboratory checkout. Additional example waveforms implement SpaceWire and timer modules, which can be used for time transfer and demonstration of communication between the two Xilinx FPGAs in the JPLSDR. The waveforms are also compatible with ground-based use of the JPL STRS OE on radio breadboards and Linux.

  10. An Intelligent Hierarchical Decision Architecture for Operational Test and Evaluation

    Science.gov (United States)

    1996-05-01

    following properties: (EPi1) e(D)=O0, VDe 4= fX); (EP2) e( = max A, ,e(A); (EP3) VA, Be Y=- e(A) 2!e(B) , if PIB (X) ! YA(W when YLAWx - and IB (X...Sensitivity Runs were made by Dr. Sam Baty at The BDM Corporation, 1801 Randolph Ave., SE, Albuquerque, New Mexico ; 20 Nov 95 - 3 Dec 95. Results were...George B. Harrison and Dr. Marion L. Williams, Headquarters, Air Force Operational Test and Evaluation Center, Kirtland AFB, New Mexico , 4 March 1996

  11. Field Testing of Utility Robots for Lunar Surface Operations

    Science.gov (United States)

    Fong, Terrence; Bualat, Maria; Deans, Matt; Allan, Mark; Bouyssounouse, Xavier; Broxton, Michael; Edwards, Laurence; Lee, Pascal; Lee, Susan Y.; Lees, David; hide

    2008-01-01

    Since 2004, NASA has been working to return to the Moon. In contrast to the Apollo missions, two key objectives of the current exploration program is to establish significant infrastructure and an outpost. Achieving these objectives will enable long-duration stays and long-distance exploration of the Moon. To do this, robotic systems will be needed to perform tasks which cannot, or should not, be performed by crew alone. In this paper, we summarize our work to develop "utility robots" for lunar surface operations, present results and lessons learned from field testing, and discuss directions for future research.

  12. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. Epidemiologic Analysis of Elective Operative Procedures in Infants Less Than 6 Months of Age in the United States.

    Science.gov (United States)

    Einhorn, Lisa M; Young, Brian J; Routh, Jonathan C; Allori, Alexander C; Tracy, Elisabeth T; Greene, Nathaniel H

    2017-11-01

    This study uses publicly available data to analyze the total number of elective, potentially deferrable operative procedures involving infants Ambulatory Surgery Database was used to identify patients in California, North Carolina, New York, and Utah during the years of 2007-2010 who were younger than 6 months of age at the time that they underwent outpatient (ambulatory) surgery. Operations that could reasonably be postponed until 6 months of age were classified as potentially deferrable procedures. Hernia repairs were analyzed separately from other deferrable procedures. Primary outcomes included the total number of elective procedures and the number and rates of potentially deferrable procedures per state per year in this population. Over the study period, a total of 27,540 procedures were identified as meeting inclusion criteria; of those, 7832 (28%) were classified as potentially deferrable, 4315 of which were hernia repairs. The average rates of potentially deferrable nonhernia procedures in California, North Carolina, New York, and Utah were 8.3, 43.8, 30.0, and 11.7 per 10,000 person-years, respectively. In multivariable analysis, private insurance (odds ratio [OR] = 1.36), self-pay status (OR = 1.50), and treatment in a different state (OR = 0.48-3.16) were independent predictors of a potentially deferrable procedure being performed on an infant younger than 6 months. Potentially deferrable procedures are still performed in infants <6 months of age. There appears to be significant variation in timing of these procedures among states. Insurance status and geography may be independent predictors of a procedure being potentially deferrable.

  14. GeoLab 2011: New Instruments and Operations Tested at Desert RATS

    Science.gov (United States)

    Evans, Cindy A.; Calaway, M. J.; Bell, M. S.

    2012-01-01

    GeoLab is a geological laboratory and testbed designed for supporting geoscience activities during NASA's analog demonstrations. Scientists at NASA's Johnson Space Center built GeoLab as part of a technology project to aid the development of science operational concepts for future planetary surface missions [1, 2, 3]. It is integrated into NASA's Habitat Demonstration Unit, a first generation exploration habitat test article. As a prototype workstation, GeoLab provides a high fidelity working space for analog mission crewmembers to perform in-situ characterization of geologic samples and communicate their findings with supporting scientists. GeoLab analog operations can provide valuable data for assessing the operational and scientific considerations of surface-based geologic analyses such as preliminary examination of samples collected by astronaut crews [4, 5]. Our analog tests also feed into sample handling and advanced curation operational concepts and procedures that will, ultimately, help ensure that the most critical samples are collected during future exploration on a planetary surface, and aid decisions about sample prioritization, sample handling and return. Data from GeoLab operations also supports science planning during a mission by providing additional detailed geologic information to supporting scientists, helping them make informed decisions about strategies for subsequent sample collection opportunities.

  15. Solution Procedure for Transport Modeling in Effluent Recharge Based on Operator-Splitting Techniques

    Directory of Open Access Journals (Sweden)

    Shutang Zhu

    2008-01-01

    Full Text Available The coupling of groundwater movement and reactive transport during groundwater recharge with wastewater leads to a complicated mathematical model, involving terms to describe convection-dispersion, adsorption/desorption and/or biodegradation, and so forth. It has been found very difficult to solve such a coupled model either analytically or numerically. The present study adopts operator-splitting techniques to decompose the coupled model into two submodels with different intrinsic characteristics. By applying an upwind finite difference scheme to the finite volume integral of the convection flux term, an implicit solution procedure is derived to solve the convection-dominant equation. The dispersion term is discretized in a standard central-difference scheme while the dispersion-dominant equation is solved using either the preconditioned Jacobi conjugate gradient (PJCG method or Thomas method based on local-one-dimensional scheme. The solution method proposed in this study is applied to the demonstration project of groundwater recharge with secondary effluent at Gaobeidian sewage treatment plant (STP successfully.

  16. A standard operating procedure for phylogenetic inference (SOPPI) using (rRNA) marker genes.

    Science.gov (United States)

    Peplies, Jörg; Kottmann, Renzo; Ludwig, Wolfgang; Glöckner, Frank Oliver

    2008-09-01

    Phylogenetic analysis is currently used worldwide for taxonomic classification and identification of microorganisms. However, despite the countless trees that have been reconstructed and published in recent decades, so far, no user-friendly compilation of recommendations to standardize the data analysis and tree reconstruction process has been published. Consequently, this standard operating procedure for phylogenetic inference (SOPPI) offers a helping hand for working through the process from sampling in the field to phylogenetic tree reconstruction and publication. It is not meant to be authoritative or comprehensive, but should help to make phylogenetic inference and diversity analysis more reliable and comparable between different laboratories. It is mainly focused on using the ribosomal RNA as a universal phylogenetic marker, but the principles and recommendations can be applied to any valid marker gene. Feedback and suggestions from the scientific community are welcome in order to improve these guidelines further. Any updates will be made available on the SILVA webpage at http://www.arb-silva.de/projects/soppi.

  17. Standard Operating Procedure Utilization for Tuberculosis Microscopy in Mekelle City, North Ethiopia.

    Science.gov (United States)

    Weldu, Yemane; Gebru, Hagos; Kahsay, Getahun; Teweldemedhn, Gebremichael; Hagos, Yifter; Kahsay, Amlsha

    2017-01-01

    The aim of this study was to assess the utilization of standard operating procedures for acid-fast bacilli (AFB) smear microscopy. A facility-based cross-sectional study was conducted in select health institutions in Mekelle City, Ethiopia, from July 1, 2015, through August 30, 2015. Using a simple random sampling technique, 18 health facilities were included in the study. Data were collected using a standard checklist and entered into Epi Info version 3.5.4 (Centers for Disease Control and Prevention, Atlanta, GA) for editing. Analysis was done using SPSS version 20 (SPSS, Chicago, IL). Of the 18 laboratory facilities, only seven (38.9%) had a legible AFB registration book. In three (16.7%) of the laboratories, heat fixation was not applied before adding primary staining reagent. In 12 (66.7%), the staining reagents had precipitates. Two laboratories had microscopes with mechanical stages that could not move freely on both axes. Seven (38.9%) of the laboratories reported samples to be negative before examining all required fields. Most laboratories, 16 (88.9%) and 17 (94.4%), respectively, did not run positive and negative controls after new batch reagent preparation. Tuberculosis microscopy was found to be substandard with clear gaps in documentation, sample collection, and processing.

  18. Results of treatment of chronic osteomyelitis by "gutter procedure and muscle flap transposition operation".

    Science.gov (United States)

    Gokalp, Mehmet Ata; Guner, Savas; Ceylan, Mehmet Fethi; Doğan, Ali; Sebik, Ahmet

    2014-04-01

    The aim of this study was to evaluate the outcomes of creation of a gutter and muscle flap transposition method for the treatment of long-bone chronic osteomyelitis. A total of thirty chronic osteomyelitis patients (thirty-one extremities), who had undergone the gutter creation and muscle flap transposition procedure between 2005 and 2009, were included in the study (19 male, 11 female; mean age 24.4 years; age range 2-75 years). Osteomyelitis of the long bones involved the femur in 13 patients, the tibia in 13, the humerus in 2, the fibula in 2 and the ulna in 1 patients, respectively. All the patients received post-operative antibiotic therapy of at least 6 weeks. The mean follow-up period was 28.7 months (6-53 months). At the end of this follow-up period, the patients were evaluated using clinical, laboratory and screening methods. Complete pain relief, disappearance of toxic symptoms, improvement in radiological findings, fistula closure and return of the blood parameters to normal ranges were accepted as successful treatment when all the afore-mentioned had been fulfilled. According to these criteria, 29 of the 30 patients had been cured. The gutter creation and muscle flap transposition method in the treatment of long-bone chronic osteomyelitis may be a successful mode of therapy when performed correctly and supported by long-term antibiotherapy.

  19. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit

    Science.gov (United States)

    2013-01-01

    Background Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Methods Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). Results The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. Conclusions We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials. PMID:23433341

  20. Smart merger of developmental and operational test and evaluation

    Science.gov (United States)

    Frizzelle, Charles Delano, Jr.

    The Department of Defense (DoD) has implemented Acquisition Reform to take advantage of commercial products, to compress the acquisition cycle, and to reduce the overall life-cycle cost of major weapon systems. This initiative, following requirements of the National Performance Review to perform faster, cheaper, and better, is expected to produce significant savings required to fund a new generation of weapons for the United States military. The DoD has a clear requirement to verify through a rigorous test and evaluation (T&E) that these advanced weapons are suitable and effective for use in combat. T&E is an inherently expensive and time-consuming activity performed to ensure that the system under test can meet contractual specifications and the operational user requirements. With a detailed and rich theoretical base, T&E has come to consider alternatives. Making a change from the safe and traditional paradigm of sequential developmental and operational T&E to a combined T&E strategy is one option. The central research question for this dissertation is "Does combining developmental and operational T&E permit faster acquisition cycle times without unnecessarily increasing risks of deploying ineffective systems?" In this interrupted time-series multiple case study, the impact of the independent variable of acquisition reform is assessed regarding the applicability and utility of a combined T&E strategy for the dependent variable of the Brilliant Eyes, Follow-on Early Warning System, and Space-based Infra-red System programs. In this analysis, the Brilliant Eyes and Follow-on Early Warning System preceded application of the independent variable while the Space-based Infra-red System followed Acquisition Reform. The conclusion of this dissertation is that the combined T&E strategy, where developmental and operational T&E events and resources are merged to the greatest extent possible consistent with mission requirements, provides significant advantages in cost and