WorldWideScience

Sample records for test line project

  1. Project W-314 specific test and evaluation plan for SN-633 transfer line (241-AX-B to 241-AY-02A)

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation

  2. Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the installation of the SN-635 transfer line for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-635 transfer line and the tie in of SN-633 to the AY-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  3. Start up testing for the secure automated fabrication line

    International Nuclear Information System (INIS)

    Gerber, E.W.; Benson, E.M.; Dahl, R.E.

    1986-01-01

    The Secure Automated Fabrication (SAF) Line has been designed and built by Westinghouse Hanford Company for the Department of Energy at the Hanford Site near Richland, Washington. The SAF Line will provide the capability for remote manufacture of fuel for Liquid Metal Reactors, and will supply fuel for the Fast Flux Test Facility (FFTF). The SAF process is highly automated and represents a major advancement in nuclear fuel manufacturing, offering significant improvements in product quality, productivity, safety, and accountability of Special Nuclear Materials. The construction phase of the project is complete, and testing has been initiated to accomplish start up of the plant for manufacture of FFTF fuel. This paper describes the test methodology used for SAF Line start up

  4. The status of the technical development for the Yamanashi Maglev test line

    Energy Technology Data Exchange (ETDEWEB)

    Nakashima, Hiroshi [Maglev Systems Development Dept., Railway Technical Research Inst., Tokyo (Japan); Seki, Akio [Linear Express Research Development Div., Central Japan Railway Co. Ltd., Tokyo (Japan)

    1996-12-31

    The superconducting maglev system has been under development for the past 25 years in Japan. In last 17 years, running test on the 7 km Miyazaki test track has yielded important data for the maglev system development. In 1990, the maglev system gained the status of one of the national - funded projects in Japan. The government authorized the 42.8 km test line in Yamanashi Prefecture and R and D entered into a new phase. This new test line is planned to go through near Tokyo on the supposed Chuo line, which is expected to be a new important line connecting Tokyo and Osaka, the central part of Japan. This fact clearly explains the role of Yamanashi test line in the future. The construction of the Yamanashi test line is energetically promoted, to start running tests in spring of 1997. The situation of the technical development of the Yamanashi test line is reviewed here. (orig.)

  5. BEAM LINE DESIGN FOR THE CERN HIRADMAT TEST FACILITY

    CERN Document Server

    Hessler, C; Goddard, B; Meddahi, M; Weterings, W

    2009-01-01

    The LHC phase II collimation project requires beam shock and impact tests of materials used for beam intercepting devices. Similar tests are also of great interest for other accelerator components such as beam entrance/exit windows and protection devices. For this purpose a dedicated High Radiation Material test facility (HiRadMat) is under study. This facility may be installed at CERN at the location of a former beam line. This paper describes the associated beam line which is foreseen to deliver a 450 GeV proton beam from the SPS with an intensity of up to 3×1013 protons per shot. Different beam line designs will be compared and the choice of the beam steering and diagnostic elements will be discussed, as well as operational issues.

  6. Beam Line Design for the CERN Hiradmat Test Facility

    CERN Document Server

    Hessler, C; Goddard, B; Meddahi, M; Weterings, W

    2010-01-01

    The LHC phase II collimation project requires beam shock and impact tests of materials used for beam intercepting devices. Similar tests are also of great interest for other accelerator components such as beam entrance/exit windows and protection devices. For this purpose a dedicated High Radiation Material test facility (HiRadMat) is under study. This facility may be installed at CERN at the location of a former beam line. This paper describes the associated beam line which is foreseen to deliver a 450 GeV proton beam from the SPS with an intensity of up to 3×10**13 protons per shot. Different beam line designs will be compared and the choice of the beam steering and diagnostic elements will be discussed, as well as operational issues.

  7. Initial Beam Test of the Prototype Strip Line BPM

    International Nuclear Information System (INIS)

    Kwon, Hyeok Jung; Kim, Han Sung; Seol, Kyung Tae; Ryu, Jin Yeong; Jang, Ji Ho; Cho, Yong Sub

    2011-01-01

    A beam position monitor (BPM) was developed which would be used for the Proton Engineering Frontier Project (PEFP) beam line. It is a strip line BPM which is commonly used one for the proton beam. The BPM cross section was designed with the SUPERFISH code and the matching section to the feed through was designed by the MWS code. The design parameters of the BPM are shown in Table 1. The designed BPM was fabricated to verify the manufacturing process and check its electrical performance. After the low power test at the test stand, the BPM was installed at the 20-MeV proton accelerator beam line as shown in Fig. 1

  8. ATHLET calculations of the pressurizer surge line break (PH-SLB test) at the PMK-2 test facility

    International Nuclear Information System (INIS)

    Krepper, E.; Schaefer, F.

    2000-01-01

    At the Hungarian integral test facility PMK-2 a pressurizer surge line break experiment (PH-SLB test) was carried out with the PHARE 4.2.6b project. The primary objective of the test was to provide experimental data for a surge line break transient at VVER-440 reactors with reduced injection from the emergency core cooling systems (ECC). At the Institute of Safety Research calculations of the experiment were performed with the thermohydraulic computer code ATHLET, which was developed by GRS (Gesellschaft fuer Anlagen- und Reaktorsicherheit) mbH. In the context of the PHARE 4.2.6b project the Institute of Safety Research has also supplied the void fraction measurement system for the PMK-2 test facility and was involved in the evaluation of the experimental results. (orig.)

  9. PHEBUS on-line aerosol monitor development test program

    International Nuclear Information System (INIS)

    Sprenger, M.H.; Pentecost, C.G.

    1992-03-01

    EG ampersand G Idaho, Inc. developed an on-line aerosol monitor (OLAM) for the French PHEBUS Fission Product Project. Part of the development was to manufacture and test an OLAM prototype. This report presents the results of the testing which determined the mechanical integrity of the monitor at operating temperature and pressure and performed a preliminary test of the optical system. A series of twenty different tests was conducted during the prototype testing sequence. Since no leaks were detected, the OLAM demonstrated that it could provide a pressure boundary at required test conditions. The optical and electrical system also proved its integrity by exceeding the design requirement of less than 105 optical signal drift during an actual two-hour test sequence

  10. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  11. Safeguards and security benefits of project straight-line

    International Nuclear Information System (INIS)

    Jaeger, C.D.; Waddoups, I.G.

    1995-01-01

    As a result of a number of events the inventory of fissile materials no longer in nuclear weapons in the United States is increasing. This has led to a growing concern regarding the potential for theft and/or diversion and accountability of this material. Straight-Line is a project whose purpose is to demonstrate a site-independent system to monitor stored nuclear material (e.g. plutonium) and integrate the collection, processing and dissemination of information regarding this material. Safeguards and security (S ampersand S) goals of this project include data transfer of information on nuclear material to appropriate users to enhance S ampersand S, continuous on-line accountability, reduction of hands-on access to nuclear materials, incorporation of information security technologies, and early detection of tampering or unauthorized material movement. This paper addresses threat considerations, S ampersand S requirements, S ampersand S objectives, and issues for the Straight-Line project. S ampersand S features and benefits of this project are discussed with respect to existing item monitoring systems and/or other material tracking systems being developed

  12. Workshop on a project for a FZR-beam line at ESRF

    International Nuclear Information System (INIS)

    Matz, W.

    1993-10-01

    The Research Center Rossendorf (FZR) investigates the possibilities to install its own beam line as a Cooperate Research Group-project (CRG) at the European Synchrotron Radiation Facility (ESRF) in Grenoble. The main interests for the FZR to use high brillant synchrotron radiation are in the Institute of Radiochemistry and the Institute of Ion Beam Physics and Materials Research. This workshop was organized by these two institutes together with the FZR Study group Synchrotron. The purpose of the workshop was to achieve a better understanding for the technical needs of the projected beam line for the planned research projects. Experts with experience in beam line design met with the Rossendorf groups to discuss the best layout for such a beam line. The summary of this workshop and the copies of transparencies of the lectures that were given are published in this booklet. (orig.)

  13. The 12th 735-kV transmission line project: Hydro-Quebec network

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec is proposing to construct a 735-kV transmission line from the Chissibi station near the LG3 hydroelectric power plant to the Jacques-Cartier station near Quebec City. The width of the right-of-way will generally be 90 m and it is intended to install the line in two stages. The Chissibi-Chibougamau section should enter service in 1993 and the Chibougamau-Cartier section in 1994. The cost of the line is estimated at $1.21 billion, of which $900 million is for line construction and $310 million for station equipment. Prospective corridors for the line route have been selected, portions of which enable twinning with Hydro-Quebec's existing 9th 735-kV line. A series of hearings on the environmental and other impacts of the power line project was held by the Bureau d'audiences publiques sur l'environnement and results are summarized along with the views of the Bureau. The summary describes the justification for the project, the choice of the transmission line route, the evaluation of the impacts of the project on the natural and human environments, health effects due to magnetic fields, and effects on the economic development of northern Quebec. Recommendations are given for mitigating the impacts of the project. 13 refs., 8 figs., 2 tabs

  14. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  15. Defining project scenarios for the agile requirements engineering product-line development questionnaire

    OpenAIRE

    Feng, Kunwu; Lempert, Meli; Tang, Yan; Tian, Kun; Cooper, Kendra M.L.; Franch Gutiérrez, Javier

    2007-01-01

    Current agile methods are focused on practices of small, rapid developing and iteration, more people oriented, less documentation projects, and the use of the methods in large, product line projects are somehow difficult. UTD and GESSI have started a project to develop an expert system that can assist a requirements enginer in selecting a requirements engineering process that is well suited for their project, in particular with respect to the use of agile and product line engineering methods....

  16. Experimental Program for the CLIC test facility 3 test beam line

    CERN Document Server

    Adli, E; Dobert, S; Olvegaard, M; Schulte, D; Syratchev, I; Lillestol, Reidar

    2010-01-01

    The CLIC Test Facility 3 Test Beam Line is the first prototype for the CLIC drive beam decelerator. Stable transport of the drive beam under deceleration is a mandatory component in the CLIC two-beam scheme. In the Test Beam Line more than 50% of the total energy will be extracted from a 150 MeV, 28 A electron drive beam, by the use of 16 power extraction and transfer structures. A number of experiments are foreseen to investigate the drive beam characteristics under deceleration in the Test Beam Line, including beam stability, beam blow up and the efficiency of the power extraction. General benchmarking of decelerator simulation and theory studies will also be performed. Specially designed instrumentation including precision BPMs, loss monitors and a time-resolved spectrometer dump will be used for the experiments. This paper describes the experimental program foreseen for the Test Beam Line, including the relevance of the results for the CLIC decelerator studies.

  17. 77 FR 35366 - Albany-Eugene Transmission Line Rebuild Project

    Science.gov (United States)

    2012-06-13

    ... materials, removing vegetation including danger trees, and revegetating areas disturbed by construction... implement the Proposed Action Alternative, based on the Albany-Eugene Transmission Line Rebuild Project (DOE...

  18. Spherical Projection Based Straight Line Segment Extraction for Single Station Terrestrial Laser Point Cloud

    Directory of Open Access Journals (Sweden)

    ZHANG Fan

    2015-06-01

    Full Text Available Due to the discrete distribution computing errors and lack of adaptability are ubiquitous in the current straight line extraction for TLS data methods. A 3D straight line segment extraction method is proposed based on spherical projection for single station terrestrial laser point clouds. Firstly, horizontal and vertical angles of each laser point are calculated by means of spherical coordinates, intensity panoramic image according to the two angles is generated. Secondly, edges which include straight line features are detected from intensity panoramic image by using of edge detection algorithm. Thirdly, great circles are detected from edges of panoramic image using spherical Hough transform. According to the axiom that a straight line segment in 3D space is a spherical great circle after spherical projection, detecting great circles from spherical projected data sets is essentially detecting straight line segments from 3D data sets without spherical projection. Finally, a robust 3D straight line fitting method is employed to fitting the straight lines and calculating parameters of the straight line segments. Experiments using different data sets and comparison with other methods show the accuracy and applicability of the proposed method.

  19. Implementation of an integrated on-line process surveillance and diagnostic system at the Halden reactor project: MOAS

    International Nuclear Information System (INIS)

    Kim, I.S.; Grini, R.-E.; Nilsen, S.

    2001-01-01

    MOAS is an integrated on-line process surveillance and diagnostic system that uses several different models for knowledge acquisition and diagnostic reasoning, such as goal-tree success-tree model, process monitor trees, and sensor failure diagnosis trees. Within these models, the knowledge of the process and its operation, including deep knowledge, like mass balance or controller algorithm, is incorporated. During an extensive review, made as part of the integrated diagnosis system project of the Halden reactor project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used for the NORS (Nokia Research Simulator) process at the Halden man-machine laboratory HAMMLAB of the OECD Halden reactor project. The performance tests of MOAS, implemented in G2 real-time expert system shell, show that MOAS successfully carries out its intended functions, i.e. quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed

  20. 49 CFR 192.719 - Transmission lines: Testing of repairs.

    Science.gov (United States)

    2010-10-01

    ... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...

  1. Susceptibility testing of fish cell lines for virus isolation

    DEFF Research Database (Denmark)

    Ariel, Ellen; Skall, Helle Frank; Olesen, Niels Jørgen

    2009-01-01

    and laboratories, but also between lineages of the same cell line. To minimise the occurrence of false negatives in a cell culture based surveillance system, we have investigated methods, to select cell lineages that are relatively superior in their susceptibility to a panel of virus isolates. The procedures...... cell lineages, we increased the number of isolates of each virus, propagated stocks in a given cell line and tested all lineages of that line in use in the laboratory. Testing of relative cell line susceptibility between laboratories is carried out annually via the Inter-laboratory Proficiency Test...... sensitivity for surveillance purposes within a cell line and between laboratories.In terms of economic and practical considerations as well as attempting to approach a realistic test system, we suggest the optimal procedure for susceptibility testing of fish cell lines for virus isolation to be a combination...

  2. A/T test system for production line; Seisan line yo A/T test system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-10

    This paper introduces an A/T test system for production line made by Meidensha, Inc. Rates and technology of mounting auto-transmissions (A/T) in recent automobiles are improving year after year. A/T production line testers were fabricated and supplied, including those for European countries. This system has the following features: the system employs low inertia AC motor, and is capable of performing tests in close conditions to actual cars; an insulated gate bipolar transistor (IGBT) inverter was employed to achieve control accuracy improvement and noise reduction; high-velocity transient measurement is possible by using a computer system based on the WindowsNT; a solenoid current slant control was employed to respond to electronically controlled A/T; and noise and vibration shift feeling instrumentation can also be used on option. Number of supply is four sets of front engine/front wheel drive (FF) car A/T testers for overseas countries, and two sets of FF A/T tests for use in Japan. (NEDO)

  3. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities[Application dated 28 June 2007 for the Line 4 Extension Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices.

  4. Testing of Prototype Magnetic Suspension Cryogenic Transfer Line

    Science.gov (United States)

    Fesmire, J. E.; Augustynowicz, S. D.; Nagy, Z. F.; Sojourner, S. J.; Shu, Q. S.; Cheng, G.; Susta, J. T.

    2006-04-01

    A 6-meter prototype cryogenic transfer line with magnetic suspension was tested for its mechanical and thermal performance at the Cryogenics Test Laboratory of NASA Kennedy Space Center (KSC). A test facility with two cryogenic end-boxes was designed and commissioned for the testing. Suspension mechanisms were verified through a series of tests with liquid nitrogen. The thermal performance of the prototype was determined using the new test apparatus. The tested prototype has incorporated temperature and vacuum pressure data acquisition ports, customized interfaces to cryogenic end-boxes, and instrumentation. All tests were conducted under simulated onsite transfer line working conditions. A static (boiloff rate measurement) testing method was employed to demonstrate the gross heat leak in the tested article. The real-time temperature distribution, vacuum level, levitation distance, and mass flow rate were measured. The main purpose of this paper is to summarize the testing facility design and preparation, test procedure, and primary test results. Special arrangements (such as turning on/off mechanical support units, observing levitation gap, and setting up the flowmeter) in testing of such a magnetically levitated transfer line are also discussed. Preliminary results show that the heat leak reduction of approximately one-third to one-half is achievable through such transfer lines with a magnetic suspension system.

  5. Rhumb lines and map wars a social history of the Mercator projection

    CERN Document Server

    Monmonier, Mark

    2010-01-01

    In Rhumb Lines and Map Wars, Mark Monmonier offers an insightful, richly illustrated account of the controversies surrounding Flemish cartographer Gerard Mercator's legacy. He takes us back to 1569, when Mercator announced a clever method of portraying the earth on a flat surface, creating the first projection to take into account the earth's roundness. As Monmonier shows, mariners benefited most from Mercator's projection, which allowed for easy navigation of the high seas with rhumb lines-clear-cut routes with a constant compass bearing-for true direction. But the projection's popularity amo

  6. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  7. MEGAPIE-TEST: A European Project on Spallation Target Testing

    International Nuclear Information System (INIS)

    Knebel, Joachim U.; Klein, Jean-Christophe; Gorse, Dominique; Agostini, Pietro; Groeschel, Friedrich; Kupschus, Peter; Kirchner, Thomas; Vogt, Jean-Bernard

    2002-01-01

    Within the Euratom 5. Framework Programme (5FP) the European Commission is funding the MEGAPIE-TEST Project (Megawatt Pilot Experiment - Testing) over a period of three years, starting in September 2001. The project is combining the efforts of 8 main associations. MEGAPIE is a liquid metal spallation target of 1 MW of beam power. The main results of the MEGAPIE-TEST project will be: Development and comprehensive testing of a liquid metal spallation target both under beam-off and beam-on conditions, and the set up of a handbook on the design of a neutron spallation source in general. The operation of MEGAPIE within the accelerator complex SINQ at Paul Scherrer Institute (PSI), Switzerland, is envisaged in 2004. MEGAPIE is a first decisive step to realize a liquid metal spallation target in Europe. This report is giving an overview of the MEGAPIE-TEST Project, the overall work plan, and preliminary results from the design support and validation, which form an important basis for the project. (authors)

  8. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  9. A 110 m long prototype helium transfer line for the HERA project

    International Nuclear Information System (INIS)

    Horvath, I.; Ming, P.; Von Burg, M.; Horlitz, G.; Sindt, H.

    1986-01-01

    A prototype helium transfer line of 110-m length was designed and constructed at SIN for the HERA project. This rendered a study of the assembly and handling processes as well as the determination of the heat losses into the transfer line. In this paper the transfer line structure is described and first results of heat transfer measurement for the specially developed super-insulation are presented

  10. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  11. 77 FR 5489 - Identification of Human Cell Lines Project

    Science.gov (United States)

    2012-02-03

    ... individual or species. With the advent of standardized, simple, and rapid methods for human cell line... project will undergo STR profiling, a DNA profiling method that examines/screens for STRs (DNA elements 2... distinct DNA profile and when the STR DNA fragment sizes are converted to numeric values, the DNA profiles...

  12. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  13. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  14. Transfer line tests take centre stage

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    Last weekend, proton beams came knocking on the LHC's door. Shooting from the SPS and into the two LHC transfer lines, the proton beams were dumped just short of entering the accelerator.   The upper plot shows the trajectory of the first TI2 beam, which reached the end of the transfer line in a single attempt after 18 months of technical stop. Below, a smoother beam trajectory in TI2 after some corrections. For the first time since Run 1, the SPS to LHC transfer lines (TI8 and TI2) transported proton beams just short of the LHC. "We tested the beam instrumentation, the devices that measure the beam intensity, transverse beam profile, position and losses, as well as the beam collimators along the transfer lines," says Reyes Alemany Fernandez, the engineer in charge of the LHC. "We were also able to spot possible bottle necks in the beam trajectory and to perform the first optics measurements." Once the beams arrived at the transfer line beam dumps...

  15. K basin sandfilter backwash line characterization project, analytical results for campaign 15

    International Nuclear Information System (INIS)

    Steen, F.H.

    1999-01-01

    Sample 183KWBMF was taken from the K West Sandfilter Backwash Pit on August 28, 1998 and received by 222-S Laboratory on August 28, 1998. Analyses were performed in accordance with ''Letter of Instruction for K Basins Sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  16. Characterization of the Goubau line for testing beam diagnostic instruments

    Science.gov (United States)

    Kim, S. Y.; Stulle, F.; Sung, C. K.; Yoo, K. H.; Seok, J.; Moon, K. J.; Choi, C. U.; Chung, Y.; Kim, G.; Woo, H. J.; Kwon, J.; Lee, I. G.; Choi, E. M.; Chung, M.

    2017-12-01

    One of the main characteristics of the Goubau line is that it supports a low-loss, non-radiated surface wave guided by a dielectric-coated metal wire. The dominant mode of the surface wave along the Goubau line is a TM01 mode, which resembles the pattern of the electromagnetic fields induced in the metallic beam pipe when the charged particle beam passes through it. Therefore, the Goubau line can be used for the preliminary bench test and performance optimization of the beam diagnostic instruments without requiring charged particle beams from the accelerators. In this paper, we discuss the basic properties of the Goubau line for testing beam diagnostic instruments and present the initial test results for button-type beam position monitors (BPMs). The experimental results are consistent with the theoretical estimations, which indicates that Goubau line allows effective testing of beam diagnostic equipment.

  17. K Basin sandfilter backwash line characterization project, analytical results for Campaign 20

    International Nuclear Information System (INIS)

    STEEN, F.H.

    1999-01-01

    Sample 112KWBMF was taken from the K West Sandfilter Backwash Pit on June 1 , 1999, and received by 222-S Laboratory on June 2,1999. Analyses were performed on sample 112KWBMF in accordance with Letter of Instruction for K Basins Sandfilter Backwash Line Samples (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  18. Radioactive liquid wastes lines removal project at Los Alamos (1981-1986)

    International Nuclear Information System (INIS)

    Elder, J.C.; Cox, E.J.; Hohner, D.P.; Valentine, A.M.

    1986-09-01

    This report describes the abandoned liquid waste lines removal operations conducted at Los Alamos in the period 1981 to 1986. Particular emphasis has been placed on as-left conditions, that is, on the location of sections of waste lines or contaminated soil which were left in place on the basis of ALARA decisions. Contaminated items were left when interfering utilities, roads, structures, or great depth made complete removal not cost effective or not safe. Left items were either not highly contaminated or they were not near the surface. Total cost of the project was $4.2 million. Approximately 5800 m 3 of contaminated waste was placed in the Solid Waste Management Site at TA-54 Area G. The project accomplished the removal of approximately 34,500 ft (6.5 miles) of abandoned waste lines under carefully controlled conditions. Procedures for excavation, waste disposal, personnel protection, and radiation monitoring are described. Environmental monitoring criteria and methods for determining acceptable levels of contamination in soils and on surfaces are discussed

  19. Start up testing for the secure automated fabrication line

    International Nuclear Information System (INIS)

    Gerber, E.W.; Benson, E.M.; Dahl, R.E.

    1987-01-01

    The secure automated fabrication (SAF) line is a remotely operated, liquid metal reactor fuel fabrication process being built by Westinghouse Hanford Company for the Department of Energy. All process and control equipment is installed and start up testing has been initiated. Start up testing is comprised of five phases, each incorporating higher degrees of equipment integration, automation, and remote control. Testing methodology for SAF line start up is described in this report

  20. Twisted sigma-model solitons on the quantum projective line

    Science.gov (United States)

    Landi, Giovanni

    2018-04-01

    On the configuration space of projections in a noncommutative algebra, and for an automorphism of the algebra, we use a twisted Hochschild cocycle for an action functional and a twisted cyclic cocycle for a topological term. The latter is Hochschild-cohomologous to the former and positivity in twisted Hochschild cohomology results into a lower bound for the action functional. While the equations for the critical points are rather involved, the use of the positivity and the bound by the topological term lead to self-duality equations (thus yielding twisted noncommutative sigma-model solitons, or instantons). We present explicit nontrivial solutions on the quantum projective line.

  1. Yeager Airport Hydrogen Vehicle Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Williams [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  2. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  3. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  4. Testing of In-Line Slurry Monitors and Pulsair Mixers with Radioactive Slurries

    Energy Technology Data Exchange (ETDEWEB)

    Hylton, T.D.; Bayne, C.K.

    1999-08-01

    Three in-line slurry monitoring instruments were demonstrated, tested, and evaluated for their capability to determine the transport properties of radioactive slurries. The instruments included the Endress + Hauser Promass 63M Coriolis meter for measuring density, the Lasentec M600P for measuring particle size distribution, and a prototype ultrasonic monitor that was developed by Argonne National Laboratory for measuring suspended solids concentration. In addition, the power consumption of the recirculation pump was monitored to determine whether this parameter could be used as a tool for in-line slurry monitoring. The Promass 63M and the M600P were also evaluated as potential indicators of suspended solids concentration. In order to use the Promass 63M as a suspended solids monitor, the densities of the fluid phase and the dry solid particle phase must be known. In addition, the fluid phase density and the dry solids density must remain constant, as any change will affect the correlation between the slurry density and the suspended solids concentration. For the M600P, the particle size distribution would need to remain relatively constant. These instruments were demonstrated and tested at the Gunite and Associated Tanks Remediation Project at the Oak Ridge National Laboratory. The testing of the instruments was conducted in parallel with the testing of a Pulsair mixing system, which was used to mix the contents of the selected tank. A total of six tests were performed. A submersible pump was positioned at two depths, while the Pulsair system was operated at three mixing rates.

  5. Manitoba Hydro long-term high-voltage transmission line magnetic field monitoring project

    International Nuclear Information System (INIS)

    Wong, P.S.; Ng, C.K.

    2008-01-01

    As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with reference to location; equipment; data analysis; and discussion of results. It was concluded that the long-term monitoring project demonstrated that the magnetic field prediction methodology was well understood and accurate, and provided valuable long-term magnetic field characteristics at the edge of the right-of-way. In addition, when there is opposition to a transmission line, public consultation and education were found to be the best options to arrive at a solution. 3 refs., 1 tab., 12 figs

  6. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  7. Leak test of the pipe line for radioactive liquid waste

    International Nuclear Information System (INIS)

    Machida, Chuji; Mori, Shoji.

    1976-01-01

    In the Tokai Research Establishment, most of the radioactive liquid waste is transferred to a wastes treatment facility through pipe lines. As part of the pipe lines a cast iron pipe for town gas is used. Leak test has been performed on all joints of the lines. For the joints buried underground, the test was made by radioactivity measurement of the soil; and for the joints in drainage ditch by the pressure and bubble methods. There were no leakage at all, indicating integrity of all the joints. On the other hand, it is also known by the other test that the corrosion of inner surface of the piping due to liquid waste is only slight. The pipe lines for transferring radioactive liquid waste are thus still usable. (auth.)

  8. K Basin Sandfilter Backwash Line Characterization Project and Analytical Results for Campaign 24

    International Nuclear Information System (INIS)

    STEEN, F.H.

    1999-01-01

    Sample 203KWBMF was taken from the K West Sandfilter Backwash Pit on November 4, 1999 and received by 2224 Laboratory on November 4, 1999. Analyses were performed on sample 203KWBMF in accordance with ''Letter of Instruction for K Basins sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  9. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  10. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices

  11. Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado

    International Nuclear Information System (INIS)

    1993-05-01

    Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed

  12. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  13. Advanced photon source low-energy undulator test line

    International Nuclear Information System (INIS)

    Milton, S.V.

    1997-01-01

    The injector system of the Advanced Photon Source (APS) consists of a linac capable of producing 450-MeV positrons or > 650-MeV electrons, a positron accumulator ring (PAR), and a booster synchrotron designed to accelerate particles to 7 GeV. There are long periods of time when these machines are not required for filling the main storage ring and instead can be used for synchrotron radiation research. We describe here an extension of the linac beam transport called the Low-Energy Undulator Test Line (LEUTL). The LEUTL will have a twofold purpose. The first is to fully characterize innovative, future generation undulators, some of which may prove difficult or impossible to measure by traditional techniques. These might include small-gap and superconducting undulators, very long undulators, undulators with designed-in internal focusing, and helical undulators. This technique also holds the promise of extending the magnetic measurement sensitivity beyond that presently attainable. This line will provide the capability to directly test undulators before their possible insertion into operating storage rings. A second use for the test line will be to investigate the generation of coherent radiation at wavelengths down to a few tens of nanometers

  14. Design and manufacture of the RF power supply and RF transmission line for SANAEM project Prometheus

    Science.gov (United States)

    Turemen, G.; Ogur, S.; Ahiska, F.; Yasatekin, B.; Cicek, E.; Ozbey, A.; Kilic, I.; Unel, G.; Alacakir, A.

    2017-08-01

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The primary goal of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator. Additionally low and high power RF test results are presented to compare the performances of the locally produced components to the commercially available ones.

  15. Test Specification of A1-1 Test for OECD-ATLAS Project

    International Nuclear Information System (INIS)

    Kang, Kyoung-Ho; Moon, Sang-Ki; Lee, Seung-Wook; Choi, Ki-Yong; Song, Chul-Hwa

    2014-01-01

    In the OECD-ATLAS project, design extension conditions (DECs) such as a station blackout (SBO) and a total loss of feed water (TLOFW) will be experimentally investigated to meet the international interests in the multiple high-risk DECs raised after the Fukushima accident. The proposed test matrix for the OECD-ATLAS project is summarized in Table 1.. In this study, detailed specification of the first test named as A1-1 in the OECD-ATLAS project was described. The target scenario of the A1-1 test is a prolonged SBO with delayed supply of turbine-driven auxiliary feedwater to only SG number 2 (SG-2). A SBO is one of the most important DECs in that without any proper operator actions, a total loss of heat sink leads to core uncover, to core damage, and ultimately a core melt-down scenario under high pressure. Due to this safety importance, a SBO is considered to be a base test item of the OECD-ATLAS project. A detailed specification of the first test named as A1-1 in the OECD-ATLAS project was described. The target scenario of the A1-1 test is a prolonged SBO with delayed supply of turbine-driven auxiliary feedwater to only SG-2 in order to consider an accident mitigation measure. The pre-test analysis using MARS code was performed with an aim of setting up the detailed test procedures for A1-1 test and also gaining the physical insights for a prolonged SBO transient. In the A1-1 test, a prolonged SBO transient will be simulated with two temporal phases: Phase (I) for conservative SBO transient without supply of turbine-driven auxiliary feedwater and Phase (II) for asymmetric cooling via single trained supply of turbine-driven auxiliary feedwater

  16. Density-independent population projection trajectories of chromosome-substituted lines resistant and susceptible to organophosphate insecticides in Drosophila melanogaster

    Directory of Open Access Journals (Sweden)

    Miyo Takahiro

    2004-11-01

    Full Text Available Abstract Background Seasonal fluctuations in susceptibility to organophosphate insecticides were observed in the Katsunuma population of Drosophila melanogaster for two consecutive years; susceptibility to three organophosphates tended to increase in the fall. To examine the hypothesis that variation in fitness among resistant and susceptible genotypes could trigger the change of genetic constitution within the fall population, we investigated density-independent population projection trajectories starting from single adult females with characteristics of chromosome-substituted lines resistant and susceptible to the three organophosphates. Results Density-independent population projection trajectories, expressed as the ratios of the number of each chromosome-substituted line to that of line SSS, for which all chromosomes were derived from the susceptible line, showed significant declines in numbers with time for all the resistant chromosome-substituted lines. Conclusion The declining tendency in the density-independent population projection trajectories of the resistant chromosome-substituted lines could explain the simultaneous decline in the levels of resistance to the three organophosphates, observed in the Katsunuma population in the fall.

  17. Testing hypotheses for differences between linear regression lines

    Science.gov (United States)

    Stanley J. Zarnoch

    2009-01-01

    Five hypotheses are identified for testing differences between simple linear regression lines. The distinctions between these hypotheses are based on a priori assumptions and illustrated with full and reduced models. The contrast approach is presented as an easy and complete method for testing for overall differences between the regressions and for making pairwise...

  18. Architecture and Functionality of the Advanced Life Support On-Line Project Information System

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriguez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  19. RELAP5 analysis of PKL, main steam line break test

    Energy Technology Data Exchange (ETDEWEB)

    Jonnet, J.R.; Stempniewicz, M.M., E-mail: stempniewicz@nrg.eu; With, A. de; Wakker, P.H.

    2013-12-15

    Highlights: • RELAP5/MOD 3.2 code validation is performed by analyzing a main steam line break test in the PKL large scale test facility. • The RELAP5 model reproduces well the important events of the PKL test. • RELAP5 transient results show noticeable sensitivity to small differences in the initial conditions. • Accurate prediction of the coolant temperature is essential for the assessment of potential core re-criticality. - Abstract: PKL is a large scale test facility of the primary system owned by AREVA NP GmbH. It is used for extensive experimental investigations to study the integral behavior of Pressurized Water Reactor (PWR) plants under accident conditions. Since 2001, the test program is a part of an international cooperation project (SETH, followed by PKL1 and PKL2) set up by the OECD. The aim of the present work was to perform a short validation study of the thermo-hydraulics code RELAP5. A model of the PKL test facility has been developed, tested and applied to one of the experiments performed at the PKL. The chosen experiment was the test G3.1. In that experiment, a main steam line break occurs, causing a rapid depressurization of the affected steam generator. This leads to an increase of the heat transfer from the primary to the secondary side and thereby to a fast cool-down transient on the primary side. The main objective of this analysis was the qualification of the RELAP5 code results against heat transfer from the primary to the secondary side in both affected and intact loops, and temperatures in the primary system. The calculation results have been compared to the experimental results. It was concluded that the most important events during the test are reproduced relatively well by the model. The calculated coolant temperature in the core is higher than in the experiment. The minimum temperature is about 5% higher than measured. The secondary pressures in SG-1, 3, and 4 is in very good agreement with the experimental value, but in the

  20. Research on the Test of Transmission Line Galloping

    Science.gov (United States)

    Zhang, Lichun; Li, Qing; lv, Zhongbin; Ji, Kunpeng; Liu, Bin

    2018-03-01

    The load of iced transmission line and the load generated by galloping after the conductor are covered by ice all may cause severe circuit faults, such as tripping, conductor breaking, armor clamp damage and even tower collapse, thus severely threatening running safety of power system. The generation and development processes of galloping of power transmission line is very complicated, and numerous factors may influence the galloping excitation, such as environmental factors, terrain factors and structural parameters of power transmission line; in which, the ice covering of conductor is one of necessary factors causing galloping. Therefore, researches on ice covering increasing test of different types of conductors under different meteorological conditions have been conducted in large-sized multi-functional phytotron, thus obtaining the relation curve of ice covering increasing of conductor along with time under different conditions, and analyzing factors influencing increasing of ice covering. The research result shows that under the same ice covering conditions, the increasing of ice covering of conductor with small diameter is relatively rapid; both environmental temperature and wind speed have obvious influence on increasing of ice covering of conductor, and the environmental temperature will decide the type of ice covering of conductor surface. Meanwhile, after wind tunnel tests targeting conductors with different ice covering shapes, pneumatic stability loss characteristics of conductors with different ice shapes have been obtained. Research results have important scientific reference value for revealing the mechanism of galloping of iced power transmission line, and have relatively high engineering practicability value for promoting realization of early warning system for galloping of iced power transmission line.

  1. Genetic modification of the human germ line: The reasons why this project has no future.

    Science.gov (United States)

    Morange, Michel

    2015-01-01

    Modification of the human germ line has remained a distant but valuable objective for most biologists since the emergence of genetics (and even before). To study the historical transformations of this project, I have selected three periods - the 1930s, at the pinnacle of eugenics, around 1974 when molecular biology triumphed, and today - and have adopted three criteria to estimate the feasibility of this project: the state of scientific knowledge, the existence of suitable tools, and societal demands. Although the long-awaited techniques to modify the germ line are now available, I will show that most of the expectations behind this project have disappeared, or are considered as being reachable by highly different strategies. Copyright © 2015 Académie des sciences. Published by Elsevier SAS. All rights reserved.

  2. Collider detector beam line test table: a structural analysis

    International Nuclear Information System (INIS)

    Leininger, M.B.

    1983-01-01

    The apparatus which sweeps calorimeter and endwall modules through the beam during testing is called a beam line test table. Because of rather stringent requirements for the physical positioning of the modules an analysis is done here to determine the modifications to the current test table design which will minimize deflections of the table under load

  3. Optimization and Improvement of Test Processes on a Production Line

    Science.gov (United States)

    Sujová, Erika; Čierna, Helena

    2018-06-01

    The paper deals with increasing processes efficiency at a production line of cylinder heads of engines in a production company operating in the automotive industry. The goal is to achieve improvement and optimization of test processes on a production line. It analyzes options for improving capacity, availability and productivity of processes of an output test by using modern technology available on the market. We have focused on analysis of operation times before and after optimization of test processes at specific production sections. By analyzing measured results we have determined differences in time before and after improvement of the process. We have determined a coefficient of efficiency OEE and by comparing outputs we have confirmed real improvement of the process of the output test of cylinder heads.

  4. Potential Errors and Test Assessment in Software Product Line Engineering

    Directory of Open Access Journals (Sweden)

    Hartmut Lackner

    2015-04-01

    Full Text Available Software product lines (SPL are a method for the development of variant-rich software systems. Compared to non-variable systems, testing SPLs is extensive due to an increasingly amount of possible products. Different approaches exist for testing SPLs, but there is less research for assessing the quality of these tests by means of error detection capability. Such test assessment is based on error injection into correct version of the system under test. However to our knowledge, potential errors in SPL engineering have never been systematically identified before. This article presents an overview over existing paradigms for specifying software product lines and the errors that can occur during the respective specification processes. For assessment of test quality, we leverage mutation testing techniques to SPL engineering and implement the identified errors as mutation operators. This allows us to run existing tests against defective products for the purpose of test assessment. From the results, we draw conclusions about the error-proneness of the surveyed SPL design paradigms and how quality of SPL tests can be improved.

  5. 40 CFR 1048.301 - When must I test my production-line engines?

    Science.gov (United States)

    2010-07-01

    ... engines? 1048.301 Section 1048.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Testing Production-line Engines § 1048.301 When must I test my production-line engines? (a) If you produce engines...

  6. 40 CFR 1045.301 - When must I test my production-line engines?

    Science.gov (United States)

    2010-07-01

    ... engines? 1045.301 Section 1045.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM SPARK-IGNITION PROPULSION MARINE ENGINES AND VESSELS Testing Production-line Engines § 1045.301 When must I test my production-line engines? (a) If you produce...

  7. Beyond the line: exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA

    NARCIS (Netherlands)

    Keegan, A.; Huemann, M.; Turner, J.R.

    2012-01-01

    The topic of what human resource management (HRM) responsibilities are devolved from the HRM department to line managers has attracted much interest in recent years. We report findings from a study on the devolution of HRM practices in four project-oriented companies (POCs) and argue that although

  8. Waste management of Line Item projects at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Zill, D.S.

    1993-01-01

    With the growing number of companies involved with today's Line Item projects at the Oak Ridge National Laboratory (ORNL), there are ever increasing problems in the handling of Radioactive Solid Low-Level Waste (SLLW). The most important of these problems is who is going to do what with the waste and when are they going to do it. The who brings to mind training; the what, compliance; and the when, cost. At ORNL, the authors have found that the best way to address the challenges of waste handling where several contractors are involved is through communication, compromise and consistency. Without these elements, opportunities bred from waste handling are likely to bring the project to a halt

  9. Reliability and normative values of the foot line test: a technique to assess foot posture

    DEFF Research Database (Denmark)

    Brushøj, C; Larsen, Klaus; Nielsen, MB

    2007-01-01

    STUDY DESIGN: Test-retest reliability. OBJECTIVE: To examine the reliability and report normative values of a novel test, the foot line test (FLT), to describe foot morphology. BACKGROUND: Numerous foot examinations are performed each day, but most existing examination techniques have considerable...... limitations regarding reliability and validity. METHODS: One hundred thirty subjects with mean foot size 44 (41-50 European size) participated. Two examiners, blinded to each other's measurements, measured the right foot of the subjects twice and the left foot once. The position of the most medial aspect...... of the navicular in the mediolateral direction was projected vertically onto a piece of paper placed under the subject's foot, and compared to the position of the forefoot and hindfoot to obtain the FLT value. RESULTS: FLT values ranged from -8 to 14 mm, with a mean (+/-SD) of 3.7 +/- 3.4 mm. The intratester...

  10. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  11. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  12. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  13. The Help-line "Invito alla Vita": a new project for suicide prevention in Trentino region.

    Science.gov (United States)

    Di Napoli, Wilma; Andreatta, Olaf

    2014-11-01

    "Invito alla Vita" is a community-based suicide prevention project that officially started in Trentino in late 2008. The project was promoted by the local Health Services, trying from the beginning to involve other community subjects, and has been working over five years and a half in different directions, particularly promoting a phone help-line. The aims of the Invito alla Vita (IaV) Help Line have been clear from the beginning: decrease the sense of loneliness, offer encouragement and support, promote engagement with health services, reduce stigma and prejudice. Contrary to popular misconceptions, talking with people about suicide will not increase suicide risk, neither will it induce patients to commit suicide.The volunteers involved in the IaV help-line offer people empathic listening without judgment and easy tips, to reduce loneliness, sadness and supply reassurance that other people care. In this study we tried to deepen our knowledges about the volunteers' motivations and necessities to use them for creating a better system of support: we realized indeed that continuous training and supervision, along with official awards given by community institutions, are basic factors to sustain the volunteers' motives to cooperate with the help line.

  14. Freeze block testing of buried waste lines

    International Nuclear Information System (INIS)

    Robbins, E.D.; Willi, J.C.

    1976-01-01

    An investigation was conducted to demonstrate application of freeze blocking in waste transfer lines such that a hydrostatic pressure test can be applied. A shop test was conducted on a 20-foot length, 3-inch schedule 40, carbon steel pipe using a coolant of dry ice and Freon. The positive results from these tests prompted a similar employment of the freeze block method in hydrostatic pressure testing the feed inlet leading to 241-S-101 Waste Tank. This pipeline is a 3-inch schedule 10, stainless steel pipe approximately 800 feet long. The freeze block was formed near the lower end of the pipe as it entered the 101-S Waste Tank and a pressure hold test was applied to this pipeline. This test proved the integrity of the pipeline in question, and demonstrated the validity of freeze blocking an open-ended pipeline which could not be hydrotested in other conventional ways. The field demonstration facility, costing $30,200 was completed late in 1975

  15. Architecture and Functionality of the Advanced Life Support On-Line Project Information System (OPIS)

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriquez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Amcs Research Center (ARC) tu develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL(Trademark) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an R&TD status information hub that can potentially serve as the primary annual reporting mechanism. Using OPIS, ALS managers and element leads will be able to carry out informed research and technology development investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, and Control). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  16. TRAC-PF1/MOD 1 independent assessment: Semiscale MOD-2A feedwater-line break (S-SF-3) and steam-line break (S-SF-5) tests

    International Nuclear Information System (INIS)

    Dobranich, D.

    1985-11-01

    The TRAC-PF1/MOD1 independent assessment project at Sandia is part of an overall effort funded by the NRC to determine the ability of various systems codes to predict the detailed thermal/hydraulic response of LWRs during accident and off-normal conditions. As part of this effort, calculations for Semiscale Mod-2A test S-SF-3, a feedwater-line break test, and S-SF-5, a steam-line break test, were performed with TRAC-PF1/MOD1. Most aspects of both the S-SF-3 and S-SF-5 steady-state calculations were found to be in good agreement with data. However, the need for a better steam separator model was identified from the S-SF-3 calculation. Overall, the qualitative behavior of both transients was calculated reasonably well; however, there were some discrepancies in the prediction of the quantitative behavior. The results for the S-SF-3 transient calculation indicate that the primary-to-secondary heat transfer degradation began too early. This was possibly due to overprediction of entrainment in the steam generator boiler, leading to an incorrect calculation of the secondary-side fluid distribution during the steady state. However, there was insufficient data to verify this. Results for the S-SF-5 transient calculation indicate that the primary-side fluid temperature response to a steam-line break was in reasonable agreement with data but the pressure response did not coincide with the data. Uncertainties in the data are sufficient to prevent us from determining the exact cause of this discrepancy, but there is indirect evidence that the calculated rate of phase change in the pressurizer was incorrect. 16 refs., 73 figs., 13 tabs

  17. 40 CFR 1045.305 - How must I prepare and test my production-line engines?

    Science.gov (United States)

    2010-07-01

    ... production-line engines? 1045.305 Section 1045.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM SPARK-IGNITION PROPULSION MARINE ENGINES AND VESSELS Testing Production-line Engines § 1045.305 How must I prepare and test my production-line engines...

  18. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Science.gov (United States)

    2010-07-01

    ... production-line engines? 1048.305 Section 1048.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Testing Production-line Engines § 1048.305 How must I prepare and test my production-line engines? This...

  19. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  20. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  1. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    International Nuclear Information System (INIS)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA)

  2. Organic lining materials test in flue gas ducts

    International Nuclear Information System (INIS)

    Raveh, R.; Sfez, D.; Johannsson, L.

    1998-01-01

    Corrosion protection solutions are being widely used in electric power plants equipped with Flue Gas Desulfurization (FGD) systems. Organic lining materials are one of many solutions available on the market for corrosion protection. This market segment is found in a continuous development in order to fulfill the severe demands of these materials. The main goal of this test is to obtain information about the high temperature resistance of the materials as occurs when the FGD system is by-passed. Aster initial investigation of this market segment only a few lining materials were found compatible according to their manufacturer data. Seven of these materials were installed in the outlet flue gas duct of the Israeli power station M.D. B. This power station is not equipped with a FGD system, thus it gives a real simulation of the environmental conditions into which the lining material is subjected when the FGD system is by-passed. The materials installation was observed carefully and performed by representatives from the manufacturers in order to avoid material failure due to a non-adequate application. The power station was shut down and the lining materials were inspected three and a half months after the lining materials were applied. The inspection results were good and besides changes in the lining color, most materials did not show any damages. During that time the flue gas temperature at the duct was 134?C except some temperature fluctuations

  3. Commissioning status of the decelerator test beam line in CTF3

    CERN Document Server

    Adli, E; Lillestol, R; Olvegaard, M; Syratchev, I; Carrillo, D; Toral, F; Faus-Golfe, A; Garcia-Garrigos, J J; Kubyshin, Y; Montoro, G

    2010-01-01

    The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. The beam line consists of a FODO lattice with high precision BPM’s and quadrupoles on movers for precise beam alignment. A total of 16 Power Extraction and Transfer Structures (PETS) will be installed in between the quadrupoles to extract 12 GHz power from the drive beam provided by the CTF3 machine. The CTF3 drive beam with a bunch-train length of 140 ns, 12 GHz bunch repetition frequency and an average current over the train of up to 28 A will be injected into the test beam line. Each PETS structure will produce 135 MW of 12 GHz power at nominal current. The beam will have lost more than 50 % of its initial energy of 150 MeV at the end of the beam line and will contain particles with energies between 65 MeV and 1...

  4. FIRST BEAM TESTS OF THE MUON COLLIDER TARGET TEST BEAM LINE AT THE AGS

    International Nuclear Information System (INIS)

    BROWN, K.A.; GASSNER, D.; GLENN, J.W.; PRIGL, R.; SIMOS, N.; SCADUTO, J.; TSOUPAS, N.

    2001-01-01

    In this report we will describe the muon collider target test beam line which operates off one branch of the AGS switchyard. The muon collider target test facility is designed to allow a prototype muon collider target system to be developed and studied. The beam requirements for the facility are ambitious but feasible. The system is designed to accept bunched beams of intensities up to 1.6 x 10 13 24 GeV protons in a single bunch. The target specifications require beam spot sizes on the order of 1 mm, 1 sigma rms at the maximum intensity. We will describe the optics design, the instrumentation, and the shielding design. Results from the commissioning of the beam line will be shown

  5. Psychometry and Pescatori projective test in coloproctological patients.

    Science.gov (United States)

    Caetano, Ana Célia; Oliveira, Dinis; Gomes, Zaida; Mesquita, Edgar; Rolanda, Carla

    2017-01-01

    Psychological assessment is not commonly performed nor easily accepted by coloproctological patients. Our aim was to evaluate the psychological component of coloproctological disorders using uncommon tools. The 21-Item Depression Anxiety and Stress Scale and the Pescatori projective test were applied to coloproctological outpatients of the Gastroenterology Department of our hospital as well as to healthy volunteers. Seventy patients (median age 47 years, 22 male) divided in 4 groups (functional constipation, constipated irritable bowel syndrome, benign anorectal disease and perianal Crohn's disease) and 52 healthy volunteers (age 45 years, 18 male) completed the tests. Proctological patients showed higher scores of depression (Pprojective test (P=0.012). A weak association between the projective test and the depression subscale was found (P=0.05). Proctological patients had higher scores of depression, anxiety and stress and lower scores in the Pescatori projective test compared to healthy controls.

  6. Bench-scale testing of on-line control of column flotation using a novel analyzer. Third quarterly technical progress report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-24

    This document contains the third quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTETM Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale flotation circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan, as well as the approach to completing the major tasks within the twelve-month project schedule. The project is broken down into three phases, which include: Phase I -- Preparation: The preparation phase was performed principally at PTI`s Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing; Phase II -- ET Circuit Installation and Testing: This installation and testing phase of the project was performed at PETC`s CPPRF from January through June, 1993, and was the major focus of the project. It involved testing of the continuous 200--300 lb/hr. circuit; and Phase III -- Project Finalization: The project finalization phase is occurring from July through September, 1993, at PTI`s Calumet offices and involves finalizing analytical work and data evaluation, as well as final project reporting. This Third Quarterly Technical Progress Report principally summarizes the results from the benchscale testing with the second coal (Pittsburgh No. 8 Seam Coal), which occurred in April through June, 1993. It also contains preliminary economic evaluations that will go into the Final Report, as well as the plan for the final reporting task.

  7. High Line

    DEFF Research Database (Denmark)

    Kiib, Hans

    2015-01-01

    At just over 10 meters above street level, the High Line extends three kilometers through three districts of Southwestern Manhattan in New York. It consists of simple steel construction, and previously served as an elevated rail line connection between Penn Station on 34th Street and the many....... The High Line project has been carried out as part of an open conversion strategy. The result is a remarkable urban architectural project, which works as a catalyst for the urban development of Western Manhattan. The greater project includes the restoration and reuse of many old industrial buildings...

  8. A test of a 2 Tesla superconducting transmission line magnet system

    International Nuclear Information System (INIS)

    Piekarz, Henryk; Carcagno, Ruben; Claypool, Brad; Foster, George W.; Hays, Steven L.; Huang, Yuenian; Kashikhin, Vladimir; Malamud, Ernest; Mazur, Peter O.; Nehring, Roger; Oleck, Andrew; Rabehl, Roger; Schlabach, Phil; Sylvester, Cosmore; Velev, Gueorgui; Volk, James; Wake, Masayoshi

    2005-01-01

    Superconducting transmission line magnet test system for an injector accelerator of a staged VLHC proton-proton colliding beam accelerator has been built and operated at Fermilab. The 1.5 m long, twin-aperture, combined function dipole magnet of 2 Tesla field is excited by a single turn 100 kA transmission line superconductor. The 100 kA dc current is generated using dc-dc switching converters powered by a bulk 240 kW supply. A pair of horizontally placed conventional leads facilitates transfer of this current to the magnet transmission line superconductor operating at liquid helium temperature. Fabrication of magnet components and magnet assembly work are described. The magnet test system and its operation are presented, and the performance is summarized

  9. A test of a 2 Tesla superconducting transmission line magnet system

    Energy Technology Data Exchange (ETDEWEB)

    Piekarz, Henryk; Carcagno, Ruben; Claypool, Brad; Foster, George W.; Hays, Steven L.; Huang, Yuenian; Kashikhin, Vladimir; Malamud, Ernest; Mazur, Peter O.; Nehring,; Oleck, Andrew; Rabehl, Roger; Schlabach, Phil; Sylvester, Cosmore; Velev, Gueorgui; Volk, James; /Fermilab; Wake, Masayoshi; /KEK, Tsukuba

    2005-09-01

    Superconducting transmission line magnet test system for an injector accelerator of a staged VLHC proton-proton colliding beam accelerator has been built and operated at Fermilab. The 1.5 m long, twin-aperture, combined function dipole magnet of 2 Tesla field is excited by a single turn 100 kA transmission line superconductor. The 100 kA dc current is generated using dc-dc switching converters powered by a bulk 240 kW supply. A pair of horizontally placed conventional leads facilitates transfer of this current to the magnet transmission line superconductor operating at liquid helium temperature. Fabrication of magnet components and magnet assembly work are described. The magnet test system and its operation are presented, and the performance is summarized.

  10. [Using projective tests in forensic psychiatry may lead to wrong conclusions. Only empirically tested tests should be used].

    Science.gov (United States)

    Trygg, L; Dåderman, A M; Wiklund, N; Meurling, A W; Lindgren, M; Lidberg, L; Levander, S

    2001-06-27

    The use of projective and psychometric psychological tests at the Department of Forensic Psychiatry in Stockholm (Huddinge), Sweden, was studied for a population of 60 men, including many patients with neuropsychological disabilities and multiple psychiatric disorders. The results showed that the use of projective tests like Rorschach, Object Relations Test, and House-Tree-Person was more frequent than the use of objective psychometric tests. Neuropsychological test batteries like the Halstead-Reitan Neuropsychological Test Battery or Luria-Nebraska Neuropsychological Battery were not used. The majority of patients were, however, assessed by intelligence scales like the WAIS-R. The questionable reliability and validity of the projective tests, and the risk of subjective interpretations, raise a problem when used in a forensic setting, since the courts' decisions about a sentence to prison or psychiatric care is based on the forensic psychiatric assessment. The use of objective psychometric neuropsychological tests and personality tests is recommended.

  11. Project W320 52-inch diameter equipment container load test: Test report

    International Nuclear Information System (INIS)

    Bellomy, J.R.

    1995-01-01

    This test report summarizes testing activities and documents the results of the load tests performed on-site and off-site to structural qualify the 52-inch equipment containers designed and fabricated under Project W-320

  12. Off-line tests on pitting damage in mercury target

    International Nuclear Information System (INIS)

    Futakawa, Masatoshi; Kogawa, Hiroyuki; Ishikura, Shuichi; Ikeda, Yujiro

    2003-03-01

    A liquid-mercury target system for the MW-scale target is being developed in the world. The moment the proton beams bombard the target, stress waves will be imposed on the beam window and pressure waves will be generated in the mercury by the thermally shocked heat deposition. Provided that the negative pressure generates through its propagation in the mercury target and causes cavitation in the mercury, there is the possibility for the cavitation bubbles collapse to form pits on the interface between the mercury and the target vessel wall. In order to estimate the cavitation erosion damage due to pitting, two types of off-line tests were performed: Split Hopkinson Pressure Bar (SHPB), and Magnetic IMpact Testing Machine (MIMTM). The data on the piping damage at the high cycle impacts up to 10 million were given by the MIMTM. Additionally the data obtained were compared with classical vibratory horn tests. As a result, it is confirmed that the mean depth erosion is predictable using a homologous line in the steady state with mass loss independently of testing machines and the incubation period is very dependent on materials and imposed pressures. (author)

  13. Crowdsourcing Broad Absorption Line Properties and Other Features of Quasar Outflow Using Zooniverse Citizen Science Project Platform

    Science.gov (United States)

    Crowe, Cassie; Lundgren, Britt; Grier, Catherine

    2018-01-01

    The Sloan Digital Sky Survey (SDSS) regularly publishes vast catalogs of quasars and other astronomical objects. Previously, the SDSS collaboration has used visual inspection to check quasar redshift validity and flag instances of broad absorption lines (BALs). This information helps researchers to easily single out the quasars with BAL properties and study their outflows and other intervening gas clouds. Due to the ever-growing number of new SDSS quasar observations, visual inspections are no longer possible using previous methods. Currently, BAL information is being determined entirely computationally, and the accuracy of that information is not precisely known. This project uses the Zooniverse citizen science platform to visually inspect quasar spectra for BAL properties, to check the accuracy of the current autonomous methods, and to flag multi-phase outflows and find candidates for in-falling gas into the quasar central engine. The layout and format of a Zooniverse project provides an easier way to inspect and record data on each spectrum and share the workload via crowdsourcing. Work done by the SDSS collaboration members is serving as a beta test for a public project upon the official release of the DR14 quasar catalog by SDSS.

  14. Fabrication and Tests of M240 Machine Gun Barrels Lined with Stellite 25

    Science.gov (United States)

    2016-04-01

    ARL-TR-7662 ● APR 2016 US Army Research Laboratory Fabrication and Tests of M240 Machine Gun Barrels Lined with Stellite 25...Fabrication and Tests of M240 Machine Gun Barrels Lined with Stellite 25 by William S de Rosset and Sean Fudger Weapons and Materials Research...

  15. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  16. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  17. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.; Bukhari, Duaa

    2013-01-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  18. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.

    2013-06-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  19. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  20. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  1. Room/corner tests of wall linings with 100/300 kW burner

    Science.gov (United States)

    M. A. Dietenberger; O. Grexa; R. H. White; M. S. Sweet; M. Janssens

    1995-01-01

    Six room/comer tests of common wall linings were conducted with gypsum-lined ceiling exposed to propane burning at 100 kW for 10 min followed by 300 kW for 10 min. This test protocol is an option provided by ISO 9705. The flashover event occurred at 1,000 kW rate of heat release within several seconds of observing flames out the doorway. The time to flashover of the...

  2. Off-line tests on pitting damage in mercury target

    CERN Document Server

    Futakawa, M; Ishikura, S; Kogawa, H; Tsai, C C

    2003-01-01

    A liquid-mercury target system for the MW-scale target is being developed in the world. The moment the proton beams bombard the target, stress waves will be imposed on the beam window and pressure waves will be generated in the mercury by the thermally shocked heat deposition. Provided that the negative pressure generates through its propagation in the mercury target and causes cavitation in the mercury, there is the possibility for the cavitation bubbles collapse to form pits on the interface between the mercury and the target vessel wall. In order to estimate the cavitation erosion damage due to pitting, two types of off-line tests were performed: Split Hopkinson Pressure Bar (SHPB), and Magnetic IMpact Testing Machine (MIMTM). The data on the piping damage at the high cycle impacts up to 10 million were given by the MIMTM. Additionally the data obtained were compared with classical vibratory horn tests. As a result, it is confirmed that the mean depth erosion is predictable using a homologous line in the s...

  3. Off-Line Testing of Tribo-Systems for Sheet Metal Forming Production

    DEFF Research Database (Denmark)

    Bay, Niels; Ceron, Ermanno

    2014-01-01

    Off-line testing of new tribo-systems for sheet metal forming production is an important issue, when new, environmentally benign lubricants are to be introduced. To obtain useful results it is, however, vital to ensure similar conditions as in the production process regarding the main tribo...... leading to very high tool/workpiece interface pressure and temperature in the second re-draw. Under such conditions only the best lubricant systems work satisfactory, and the paper shows how the performance of different tribo-systems in production may be predicted by off-line testing combined...

  4. The SSM/PMAD automated test bed project

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).

  5. Yucca Mountain project prototype testing

    International Nuclear Information System (INIS)

    Hughes, W.T.; Girdley, W.A.

    1990-01-01

    The U.S. DOE is responsible for characterizing the Yucca Mountain site in Nevada to determine its suitability for development as a geologic repository to isolate high-level nuclear waste for at least 10,000 years. This unprecedented task relies in part on measurements made with relatively new methods or applications, such as dry coring and overcoring for studies to be conducted from the land surface and in an underground facility. The Yucca Mountain Project has, since 1988, implemented a program of equipment development and methods development for a broad spectrum of hydrologic, geologic, rock mechanics, and thermomechanical tests planned for use in an Exploratory Shaft during site characterization at the Yucca Mountain site. A second major program was fielded beginning in April 1989 to develop and test methods and equipment for surface drilling to obtain core samples from depth using only air as a circulating medium. The third major area of prototype testing has been during the ongoing development of the Instrumentation/ Data Acquisition System (IDAS), designed to collect and monitor data from down-hole instrumentation in the unsaturated zone, and store and transmit the data to a central archiving computer. Future prototype work is planned for several programs including the application of vertical seismic profiling methods and flume design to characterizing the geology at Yucca Mountain. The major objectives of this prototype testing are to assure that planned Site Characterization testing can be carried out effectively at Yucca Mountain, both in the Exploratory Shaft Facility (ESF), and from the surface, and to avoid potential major failures or delays that could result from the need to re-design testing concepts or equipment. This paper will describe the scope of the Yucca Mountain Project prototype testing programs and summarize results to date. 3 figs

  6. McMurray's Test and Joint Line Tenderness for Medial Meniscus ...

    African Journals Online (AJOL)

    The wide variations reported have an impact on clinical decision concerning whether to go for other diagnostic tests before going for diagnostic arthroscopy, which is considered as the gold standard.The purpose of this study was to determine the diagnostic value of Joint line tenderness and McMurray's test, as clinical signs ...

  7. Discussion after implementation of possible ergonomics contributions in production lines automation project

    Directory of Open Access Journals (Sweden)

    José Adriano Canton

    2016-11-01

    Full Text Available This paper addresses the issue of work spaces designed based on Activity-Centered Ergonomics. The aim was to reflect on the role of Ergonomics in the design of productive situations in order to anticipate and mitigate the emergence of new constraints. This study was developed using a case study from the packaging industry, where an automated line was implemented to mitigate the injuries suffered as result of the manual system. This article was based on the results of an Ergonomic Work Analysis of the solution implemented, and the subsequent analysis of this design process. It was found that the adopted solution does not have enough leeway for dealing with variations inherent to the process, requiring constant interventions in the operation, by the operators in order to free the line to continue work. It was evident that the adopted solution did not involve the participation of important agents such as the operators and the maintenance crew, giving the project a technical vision that was concerned with eliminating the human factor. The conclusion of this study was that the Ergonomics integrated into the project development favors the collective construction of analysis of the research, and consequently, the development of more effective solutions.

  8. EC Transmission Line Risk Identification and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Bigelow, Tim S [ORNL

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  9. On line isotopic separator test benches at GANIL

    International Nuclear Information System (INIS)

    Anne, R.; Bru, B.; Joubert, A.; Leroy, R.; Obert, J.; Putaux, J.C.; Liang, C.F.; Paris, P.; Orr, N.; Steckmeyer, J.C.

    1993-01-01

    A first version of isotopic separator on line test bench has been built in order to test the feasibility of the production of radioactive species from 96 MeV/u of 20 Ne impinging a thick target of MgO. This test bench was equipped with a very compact ECR ion source (Nanogan) entirely made from permanent magnets and operating at 10 Ghz. 18 Ne 2,4+ ; 19N e 1,2,3,4+ and 23,24 Ne 1+ has been produced and ionized. A new more performing separator (SIRa) allowing the use of different types of ion sources will be completed by the end of 1993. (author) 4 refs., 4 figs., 1 tab

  10. Design of 8-ft-Diameter Barrel Test Article Attachment Rings for Shell Buckling Knockdown Factor Project

    Science.gov (United States)

    Lovejoy, Andrew E.; Hilburger, Mark W.

    2010-01-01

    The Shell Buckling Knockdown Factor (SBKF) project includes the testing of sub-scale cylinders to validate new shell buckling knockdown factors for use in the design of the Ares-I and Ares-V launch vehicles. Test article cylinders represent various barrel segments of the Ares-I and Ares-V vehicles, and also include checkout test articles. Testing will be conducted at Marshall Space Flight Center (MSFC) for test articles having an eight-foot diameter outer mold line (OML) and having lengths that range from three to ten feet long. Both ends of the test articles will be connected to the test apparatus using attachment rings. Three multiple-piece and one single-piece design for the attachment rings were developed and analyzed. The single-piece design was chosen and will be fabricated from either steel or aluminum (Al) depending on the required safety factors (SF) for test hardware. This report summarizes the design and analysis of these attachment ring concepts.

  11. Final design of the neutral beam lines for the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Pittenger, L.C.; Valby, L.E.; Stone, R.R.; Pedrotti, L.R.; Denhoy, B.; Yoard, R.

    1979-01-01

    Final design of the neutral beam lines for TFTR has been completed. A prototype has been assembled at Lawrence Berkeley Laboratory and is undergoing testing as part of the Neutral Beam System Test Facility (NBSTF). The final neutral beam line (NBL) configuration differs in several details from that previously reported upon; certain components have been added; and testing of the cryopump system has led to some design simplification. It is these developments which are reported herein

  12. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  13. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  14. Integrating Multiple On-line Knowledge Bases for Disease-Lab Test Relation Extraction.

    Science.gov (United States)

    Zhang, Yaoyun; Soysal, Ergin; Moon, Sungrim; Wang, Jingqi; Tao, Cui; Xu, Hua

    2015-01-01

    A computable knowledge base containing relations between diseases and lab tests would be a great resource for many biomedical informatics applications. This paper describes our initial step towards establishing a comprehensive knowledge base of disease and lab tests relations utilizing three public on-line resources. LabTestsOnline, MedlinePlus and Wikipedia are integrated to create a freely available, computable disease-lab test knowledgebase. Disease and lab test concepts are identified using MetaMap and relations between diseases and lab tests are determined based on source-specific rules. Experimental results demonstrate a high precision for relation extraction, with Wikipedia achieving the highest precision of 87%. Combining the three sources reached a recall of 51.40%, when compared with a subset of disease-lab test relations extracted from a reference book. Moreover, we found additional disease-lab test relations from on-line resources, indicating they are complementary to existing reference books for building a comprehensive disease and lab test relation knowledge base.

  15. Transmission line component testing for the ITER Ion Cyclotron Heating and Current Drive System

    Science.gov (United States)

    Goulding, Richard; Bell, G. L.; Deibele, C. E.; McCarthy, M. P.; Rasmussen, D. A.; Swain, D. W.; Barber, G. C.; Barbier, C. N.; Cambell, I. H.; Moon, R. L.; Pesavento, P. V.; Fredd, E.; Greenough, N.; Kung, C.

    2014-10-01

    High power RF testing is underway to evaluate transmission line components for the ITER Ion Cyclotron Heating and Current Drive System. The transmission line has a characteristic impedance Z0 = 50 Ω and a nominal outer diameter of 305 mm. It is specified to carry up to 6 MW at VSWR = 1.5 for 3600 s pulses, with transient voltages up to 40 kV. The transmission line is actively cooled, with turbulent gas flow (N2) used to transfer heat from the inner to outer conductor, which is water cooled. High voltage and high current testing of components has been performed using resonant lines generating steady state voltages of 35 kV and transient voltages up to 60 kV. A resonant ring, which has operated with circulating power of 6 MW for 1 hr pulses, is being used to test high power, low VSWR operation. Components tested to date include gas barriers, straight sections of various lengths, and 90 degree elbows. Designs tested include gas barriers fabricated from quartz and aluminum nitride, and transmission lines with quartz and alumina inner conductor supports. The latest results will be presented. This manuscript has been authored by UT-Battelle, LLC, under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy.

  16. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  17. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  18. Proposed particle-beam characterizations for the APS undulator test line

    Energy Technology Data Exchange (ETDEWEB)

    Lumpkin, A.H.; Borland, M.; Milton, S.

    1993-09-01

    A research and development effort is underway at the Advanced Photon Source (APS) to use an rf gun as a low-emittance electron source for injection into the 100- to 650-MeV linac subsystem and subsequently to an undulator test area. This configuration would combine the acceleration capability of the 200-MeV S-band electron linac and the in-line 450-MeV positron linac that normally provide positrons to the positron accumulator ring (PAR). A transport line that bypasses the PAR will bring the electrons to the undulator test area. Characterization techniques will be discussed for the electron beam with a normalized, rms emittance of <10 {pi} mm mrad (1{sigma}) at micropulse charges of up to 350 pC and micropulse durations of {approximately}5 ps (FWHM). Tests proposed include measurement of particle beam transport effects (at one-tenth the storage ring beam rigidity) caused by small undulator field errors as well as operations intended to produce coherent, short wavelength radiation (<200 nm).

  19. 40 CFR 1051.301 - When must I test my production-line vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... vehicles or engines? 1051.301 Section 1051.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Testing Production-Line Vehicles and Engines § 1051.301 When must I test my production-line vehicles or engines? (a...

  20. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  1. Double-Ended Break Test of an 8.5 inch Direct Vessel Injection Line using the ATLAS

    International Nuclear Information System (INIS)

    Choi, Ki Yong; Kang, Kyoung Ho; Kim, Bok Deuk; Kim, Yeon Sik; Min, Kyoung Ho; Park, Choon Kyoung; Park, Hyun Sik; Baek, Won Pil; Cho, Seok; Choi, Nam Hyun

    2010-01-01

    A thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), has been constructed at the Korea Atomic Energy Research Institute (KAERI). It is a 1/2 reduced height and 1/288-volume scaled test facility with respect to the APR1400, an evolutionary pressurized water reactor developed by the Korean industry. In 2008, an integral effect test for simulating a guillotine break of a DVI line of the APR1400 was carried out as the first DVI test item, named as SB-DVI-03, on May, 2008. With an improvement on the break flow measuring system, the second DVI test for a guillotine break of a DVI line of the APR1400, named as SB-DVI-08, was conducted for repeatability. The present data is the first integral effect test data of its kind for simulating a DVI line break accident. It will help in understanding the thermal hydraulic phenomena occurring during the DVI line break accident. A post-test calculation was performed with a best-estimate safety analysis code MARS 3.1 to examine its prediction capability and to identify any code deficiencies for the thermal hydraulic phenomena occurring during the DVI line break accidents. The present integral effect test data will be used to validate the current safety analysis methodology for the DVI line break accident

  2. Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3

    CERN Document Server

    Lillestøl, R L; Olvegård, M; Rabiller, A N; Sterbini, G; Adli, E

    2012-01-01

    The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FODO structure with high precision BPMs and quadrupoles mounted on mechanical movers for precisebeam alignment. Nine out of the planned 16 Power Extraction and Transfer Structures have currently been installed and commissioned. We correlate rf power production measurements with the drive beam deceleration measurements, and compare the two measurements to the theoretical predictions. We also discuss the impact of the drive beam bunch length and bunch combination on the measurements.

  3. Experiment data of 200% recirculation pump discharge line break integral test run 961 with HPCS failure at ROSA-III and comparison with results of suction line break tests

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Tasaka, Kanji; Nakamura, Hideo; Anoda, Yoshinari; Kumamaru, Hiroshige; Murata, Hideo; Yonomoto, Taisuke; Shiba, Masayoshi

    1984-03-01

    This report presents the experimental data of RUN 961, a 200% double-ended break test at the recirculation pump discharge line in the ROSA-III test facility. The ROSA-III test facility is a volumetrically scaled (1/424) system of the BWR/6. The facility has the electrically heated core, the break simulator and the scaled ECCS (Emergency Core Cooling System). The MSIV (Main Steam Isolation Valve) closure and the ECCS actuation were tripped by the liquid level in the upper downcomer. The PCT (Peak Cladding Temperature) was 894 K, which was 107 K higher than a 200% pump suction line break test (RUN 926) due to the smaller depressurization rate. The effect of break location on transient LOCA phenomena was clarified by comparing the discharge and suction break tests. The whole core was quenched 71 s after LPCI actuation and the effectiveness of ECCS has been confirmed. (author)

  4. SPACE code simulation of ATLAS DVI line break accident test (SB DVI 08 Test)

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Sang Gyu [KHNP, Daejeon (Korea, Republic of)

    2012-10-15

    APR1400 has adopted new safety design features which are 4 mechanically independent DVI (Direct Vessel Injection) systems and fluidic device in the safety injection tanks (SITs). Hence, DVI line break accident has to be evaluated as one of the small break LOCA (SBLOCA) to ensure the safety of APR1400. KAERI has been performed for DVI line break test (SB DVI 08) using ATLAS (Advanced Thermal Hydraulic Test Loop for Accident Simulation) facility which is an integral effect test facility for APR1400. The test result shows that the core collapsed water level decreased before a loop seal clearance, so that a core uncover occurred. At this time, the peak cladding temperature (PCT) is rapidly increased even though the emergency core cooling (ECC) water is injected from safety injection pump (SIP). This test result is useful for supporting safety analysis using thermal hydraulic safety analysis code and increases the understanding of SBLOCA phenomena in APR1400. The SBLOCA evaluation methodology for APR1400 is now being developed using SPACE code. The object of the development of this methodology is to set up a conservative evaluation methodology in accordance with appendix K of 10 CFR 50. ATLAS SB DVI 08 test is selected for the evaluation of SBLOCA methodology using SPACE code. Before applying the conservative models and correlations, benchmark calculation of the test is performed with the best estimate models and correlations to verify SPACE code capability. This paper deals with benchmark calculations results of ATLAS SB DVI 08 test. Calculation results of the major hydraulics variables are compared with measured data. Finally, this paper carries out the SPACE code performances for simulating the integral effect test of SBLOCA.

  5. Nahm transformation for parabolic Higgs bundles on the projective line --- case of non-semisimple residues

    OpenAIRE

    Szabo, Szilard

    2016-01-01

    We extend our earlier construction of Nahm transformation for parabolic Higgs bundles on the projective line to solutions with not necessarily semisimple residues and show that it determines a holomorphic mapping on corresponding moduli spaces. The construction relies on suitable elementary modifications of the logarithmic Dolbeault complex.

  6. Nahm transformation for parabolic Higgs bundles on the projective line-Case of non-semisimple residues

    Science.gov (United States)

    Szabó, Szilárd

    2017-12-01

    We extend our earlier construction of Nahm transformation for parabolic Higgs bundles on the projective line to solutions with not necessarily semisimple residues and show that it determines a holomorphic mapping on corresponding moduli spaces. The construction relies on suitable elementary modifications of the logarithmic Dolbeault complex.

  7. Test and evaluation of the in-line plutonium solution K-absorption-edge densitometer at the Savannah River Plant. Phase I. Off-line testing results

    International Nuclear Information System (INIS)

    Smith, H.A. Jr.; Marks, T.; Johnson, S.S.

    1982-04-01

    An in-line, plutonium-solution, K-edge absorption densitometer has been developed at Los Alamos and is currently undergoing test and evaluation at the Savannah River Plant (SRP). The first phase of the test and evaluation (off-line instrument calibration and solution assays) was completed, and preparations are under way to install the instrument in-line, as soon as process schedules permit. Calibration data in the design concentration range of 25 to 40 g Pu/L demonstrate routine achievement of densitometry assay precisions of 0.5% or better in 40 min. Plutonium assays at concentrations outside the calibration range were investigated in an effort to define better the limitations of the instrument and address other possible assay situations at SRP. Densitometry precisions obtained for 40-min assays range from 3% to 5 g Pu/L down to 0.4% at 70 g Pu/L. At higher plutonium concentrations, the precision deteriorated due to increasing gamma-ray absorption by the solution. In addition, with actinide concentrations above approximately 100 g/L, the assay accuracy also suffered because of enhanced small-angle scattering effects in the large sample cell. Measurements on mixed U/Pu solutions demonstrated the feasibility of accurate plutonium assays with correction for the large uranium matrix contributions being determined from the measurement data. The 239 240 Pu weight fractions and 241 Pu/ 239 Pu and 238 Pu/ 239 Pu isotopic ratios can be determined. In a mockup of the in-line solution plumbing system, all assay sequences, error conditions, and interlock criteria were exercised and verified to be working properly

  8. Qinshan phase II extension nuclear power project thermal stratification and fatigue stress analysis for pressurizer surge line

    International Nuclear Information System (INIS)

    Yu Xiaofei; Zhang Yixiong; Ai Honglei

    2010-01-01

    Thermal stratification of pressurizer surge line induced by the inside fluid brings on global bending moments, local thermal stresses, unexpected displacements and support loadings of the pipe system. In order to avoid a costly three-dimensional computation, a combined 1D/2D technique has been developed and implemented to analyze the thermal stratification and fatigue stress of pressurize surge line of QINSHAN Phase II Extension Nuclear Power Project in this paper, using the computer codes SYSTUS and ROCOCO. According to the mechanical analysis results of stratification, the maximum stress and cumulative usage factor, the loadings at connections of surge line to main pipe and RCP and the displacements of surge line at supports are obtained. (authors)

  9. Project W-049H disposal facility test report

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    The purpose of this Acceptance Test Report (ATR) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the equipment installed in the Disposal Facility has been installed in accordance with the design documents and function as required by the project criteria

  10. A comparison of paper-and-pencil and computerized forms of Line Orientation and Enhanced Cued Recall Tests.

    Science.gov (United States)

    Aşkar, Petek; Altun, Arif; Cangöz, Banu; Cevik, Vildan; Kaya, Galip; Türksoy, Hasan

    2012-04-01

    The purpose of this study was to assess whether a computerized battery of neuropsychological tests could produce similar results as the conventional forms. Comparisons on 77 volunteer undergraduates were carried out with two neuropsychological tests: Line Orientation Test and Enhanced Cued Recall Test. Firstly, students were assigned randomly across the test medium (paper-and-pencil versus computerized). Secondly, the groups were given the same test in the other medium after a 30-day interval between tests. Results showed that the Enhanced Cued Recall Test-Computer-based did not correlate with the Enhanced Cued Recall Test-Paper-and-pencil results. Line Orientation Test-Computer-based scores, on the other hand, did correlate significantly with the Line Orientation Test-Paper-and-pencil version. In both tests, scores were higher on paper-and-pencil tests compared to computer-based tests. Total score difference between modalities was statistically significant for both Enhanced Cued Recall Tests and for the Line Orientation Test. In both computer-based tests, it took less time for participants to complete the tests.

  11. Basic Test Framework for the Evaluation of Text Line Segmentation and Text Parameter Extraction

    Directory of Open Access Journals (Sweden)

    Darko Brodić

    2010-05-01

    Full Text Available Text line segmentation is an essential stage in off-line optical character recognition (OCR systems. It is a key because inaccurately segmented text lines will lead to OCR failure. Text line segmentation of handwritten documents is a complex and diverse problem, complicated by the nature of handwriting. Hence, text line segmentation is a leading challenge in handwritten document image processing. Due to inconsistencies in measurement and evaluation of text segmentation algorithm quality, some basic set of measurement methods is required. Currently, there is no commonly accepted one and all algorithm evaluation is custom oriented. In this paper, a basic test framework for the evaluation of text feature extraction algorithms is proposed. This test framework consists of a few experiments primarily linked to text line segmentation, skew rate and reference text line evaluation. Although they are mutually independent, the results obtained are strongly cross linked. In the end, its suitability for different types of letters and languages as well as its adaptability are its main advantages. Thus, the paper presents an efficient evaluation method for text analysis algorithms.

  12. On-line test of power distribution prediction system for boiling water reactors

    International Nuclear Information System (INIS)

    Nishizawa, Y.; Kiguchi, T.; Kobayashi, S.; Takumi, K.; Tanaka, H.; Tsutsumi, R.; Yokomi, M.

    1982-01-01

    A power distribution prediction system for boiling water reactors has been developed and its on-line performance test has proceeded at an operating commercial reactor. This system predicts the power distribution or thermal margin in advance of control rod operations and core flow rate change. This system consists of an on-line computer system, an operator's console with a color cathode-ray tube, and plant data input devices. The main functions of this system are present power distribution monitoring, power distribution prediction, and power-up trajectory prediction. The calculation method is based on a simplified nuclear thermal-hydraulic calculation, which is combined with a method of model identification to the actual reactor core state. It has been ascertained by the on-line test that the predicted power distribution (readings of traversing in-core probe) agrees with the measured data within 6% root-mean-square. The computing time required for one prediction calculation step is less than or equal to 1.5 min by an HIDIC-80 on-line computer

  13. The final focus test beam project

    International Nuclear Information System (INIS)

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 μm. 5 refs., 2 figs., 1 tab

  14. Development Approach of the Advanced Life Support On-line Project Information System

    Science.gov (United States)

    Levri, Julie A.; Hogan, John A.; Morrow, Rich; Ho, Michael C.; Kaehms, Bob; Cavazzoni, Jim; Brodbeck, Christina A.; Whitaker, Dawn R.

    2005-01-01

    The Advanced Life Support (ALS) Program has recently accelerated an effort to develop an On-line Project Information System (OPIS) for research project and technology development data centralization and sharing. There has been significant advancement in the On-line Project Information System (OPIS) over the past year (Hogan et al, 2004). This paper presents the resultant OPIS development approach. OPIS is being built as an application framework consisting of an uderlying Linux/Apache/MySQL/PHP (LAMP) stack, and supporting class libraries that provides database abstraction and automatic code generation, simplifying the ongoing development and maintenance process. Such a development approach allows for quick adaptation to serve multiple Programs, although initial deployment is for an ALS module. OPIS core functionality will involve a Web-based annual solicitation of project and technology data directly from ALS Principal Investigators (PIs) through customized data collection forms. Data provided by PIs will be reviewed by a Technical Task Monitor (TTM) before posting the information to OPIS for ALS Community viewing via the Web. Such Annual Reports will be permanent, citable references within OPIS. OPlS core functionality will also include Project Home Sites, which will allow PIS to provide updated technology information to the Community in between Annual Report updates. All data will be stored in an object-oriented relational database, created in MySQL(Reistered Trademark) and located on a secure server at NASA Ames Research Center (ARC). Upon launch, OPlS can be utilized by Managers to identify research and technology development (R&TD) gaps and to assess task performance. Analysts can employ OPlS to obtain the current, comprehensive, accurate information about advanced technologies that is required to perform trade studies of various life support system options. ALS researchers and technology developers can use OPlS to achieve an improved understanding of the NASA

  15. On-line testing of calibration of process instrumentation channels in nuclear power plants. Phase 2, Final report

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    1995-11-01

    The nuclear industry is interested in automating the calibration of process instrumentation channels; this report provides key results of one of the sponsored projects to determine the validity of automated calibrations. Conclusion is that the normal outputs of instrument channels in nuclear plants can be monitored over a fuel cycle while the plant is operating to determine calibration drift in the field sensors and associated signal conversion and signal conditioning equipment. The procedure for on-line calibration tests involving calculating the deviation of each instrument channel from the best estimate of the process parameter that the instrument is measuring. Methods were evaluated for determining the best estimate. Deviation of each signal from the best estimate is updated frequently while the plant is operating and plotted vs time for entire fuel cycle, thereby providing time history plots that can reveal channel drift and other anomalies. Any instrument channel that exceeds allowable drift or channel accuracy band is then scheduled for calibration during a refueling outage or sooner. This provides calibration test results at the process operating point, one of the most critical points of the channel operation. This should suffice for most narrow-range instruments, although the calibration of some instruments can be verified at other points throughout their range. It should be pointed out that the calibration of some process signals such as the high pressure coolant injection flow in BWRs, which are normally off- scale during plant operation, can not be tested on-line

  16. Urban High School Student Engagement through CincySTEM iTEST Projects

    Science.gov (United States)

    Beckett, Gulbahar H.; Hemmings, Annette; Maltbie, Catherine; Wright, Kathy; Sherman, Melissa; Sersion, Brian

    2016-01-01

    This paper focuses on the notable heightening of underrepresented students' engagement in STEM education through project-based learning CincySTEM iTEST projects. The projects, funded by an iTEST NSF grant, were designed and facilitated by teachers at a new STEM urban public high school serving low-income African-American students. Student…

  17. Projection systems with a cut-off line for automotive applications

    Science.gov (United States)

    Kloos, G.; Eichhorn, K.

    2005-08-01

    The lighting systems of a car provide a variety of challenges from the point of view of illumination science and technology. Engineering work in this field has to deal both with reflector and lens design as well as with opto-mechanical design and sensor technology. It has direct implications on traffic safety and the efficiency in which energy is used. Therefore, these systems are continuously improved and optimized. In this context, adaptive systems that we investigate for automotive applications gain increasing importance. The properties of the light distribution in the vicinity of the cut-off line are of key importance for the safe and efficient operation of automotive headlamps. An alternative approach is proposed to refine the description of these properties in an attempt to make it more quantitative. This description is intended to facilitate intercomparison between different systems and/or to study environmental influences on the cut-off line of a system under investigation. Designing projection systems it is necessary to take a delicate trade-off between efficiency, light-distribution characteristics, mechanical boundary conditions, and legal requirements into account. Considerations and results on optical properties of three-axial reflectors in dependence of layout parameters will be given. They can serve as a guideline for the optical workshop and for free-form optimization.

  18. Beam line design using G4BeamLine

    CERN Document Server

    Dogan, Arda

    2014-01-01

    In Turkey in Ankara TAEK SANAEM Proton Accelerator Facility (PAF), there is a cyclotron which produces a focused intense 30 MeV proton beam and sends this beam to four different arms, three of which uses this beam to produce pharmaceutical medicine. The remaining one is spared for R&D purposes and the idea was to use these protons coming out from the fourth arm to use space radiation tests, which cannot be done in Turkey at the moment. However, according to SCC 25100 standards which is for 30 MeV protons, the beam coming out of cyclotron is too intense and focused to use for space radiation tests. Therefore, the main aim of my project is to design a beam line which will defocus the beam and reduce the flux so that the space radiation tests can be done according to the standards of SCC 25100.

  19. Development of an in vitro skin sensitization test using human cell lines; human Cell Line Activation Test (h-CLAT). II. An inter-laboratory study of the h-CLAT.

    Science.gov (United States)

    Sakaguchi, H; Ashikaga, T; Miyazawa, M; Yoshida, Y; Ito, Y; Yoneyama, K; Hirota, M; Itagaki, H; Toyoda, H; Suzuki, H

    2006-08-01

    Recent regulatory changes have placed a major emphasis on in vitro safety testing and alternative models. In regard to skin sensitization tests, dendritic cells (DCs) derived from human peripheral blood have been considered in the development of new in vitro alternatives. Human cell lines have been also reported recently. In our previous study, we suggested that measuring CD86 and/or CD54 expression on THP-1 cells (human monocytic leukemia cell line) could be used as an in vitro skin sensitization method. An inter-laboratory study among two laboratories was undertaken in Japan in order to further develop an in vitro skin sensitization model. In the present study, we used two human cell lines: THP-1 and U-937 (human histiocytic lymphoma cell line). First we optimized our test protocol (refer to the related paper entitled "optimization of the h-CLAT protocol" within this journal) and then we did an inter-laboratory validation with nine chemicals using the optimized protocol. We measured the expression of CD86 and CD54 on the above cells using flow cytometry after a 24h and 48h exposure to six known allergens (e.g., DNCB, pPD, NiSO(4)) and three non-allergens (e.g., SLS, tween 80). For the sample test concentration, four doses (0.1x, 0.5x, 1x, and 2x of the 50% inhibitory concentration (IC(50))) were evaluated. IC(50) was calculated using MTT assay. We found that allergens/non-allergens were better predicted using THP-1 cells compared to U-937 cells following a 24 h and a 48 h exposure. We also found that the 24h treatment time tended to have a better accuracy than the 48 h treatment time for THP-1 cells. Expression of CD86 and CD54 were good predictive markers for THP-1 cells, but for U-937 cells, expression of CD86 was a better predictor than CD54, at the 24h and the 48 h treatment time. The accuracy also improved when both markers (CD86 and CD54) were used as compared with a single marker for THP-1 cells. Both laboratories gave a good prediction of allergen

  20. DISCRETIZATION APPROACH USING RAY-TESTING MODEL IN PARTING LINE AND PARTING SURFACE GENERATION

    Institute of Scientific and Technical Information of China (English)

    HAN Jianwen; JIAN Bin; YAN Guangrong; LEI Yi

    2007-01-01

    Surface classification, 3D parting line, parting surface generation and demoldability analysis which is helpful to select optimal parting direction and optimal parting line are involved in automatic cavity design based on the ray-testing model. A new ray-testing approach is presented to classify the part surfaces to core/cavity surfaces and undercut surfaces by automatic identifying the visibility of surfaces. A simple, direct and efficient algorithm to identify surface visibility is developed. The algorithm is robust and adapted to rather complicated geometry, so it is valuable in computer-aided mold design systems. To validate the efficiency of the approach, an experimental program is implemented. Case studies show that the approach is practical and valuable in automatic parting line and parting surface generation.

  1. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  2. An Approach to a Comprehensive Test Framework for Analysis and Evaluation of Text Line Segmentation Algorithms

    Directory of Open Access Journals (Sweden)

    Zoran N. Milivojevic

    2011-09-01

    Full Text Available The paper introduces a testing framework for the evaluation and validation of text line segmentation algorithms. Text line segmentation represents the key action for correct optical character recognition. Many of the tests for the evaluation of text line segmentation algorithms deal with text databases as reference templates. Because of the mismatch, the reliable testing framework is required. Hence, a new approach to a comprehensive experimental framework for the evaluation of text line segmentation algorithms is proposed. It consists of synthetic multi-like text samples and real handwritten text as well. Although the tests are mutually independent, the results are cross-linked. The proposed method can be used for different types of scripts and languages. Furthermore, two different procedures for the evaluation of algorithm efficiency based on the obtained error type classification are proposed. The first is based on the segmentation line error description, while the second one incorporates well-known signal detection theory. Each of them has different capabilities and convenience, but they can be used as supplements to make the evaluation process efficient. Overall the proposed procedure based on the segmentation line error description has some advantages, characterized by five measures that describe measurement procedures.

  3. Gas reactor in-pile safety test project (GRIST-2)

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Arbtin, E.; St Pierre, R.

    1979-01-01

    Although out-of-pile tests may be expected to confirm individual phenomena models in core disruptive accident analysis codes, only in-pile tests are capable of verifying the extremely complex integrated model effects within the appropriate time phase for these accidents. For this reason, the GRIST-2 project, the purpose of which is to design and construct an in-pile helium loop capable of transient safety testing in the TREAT facility in Idaho, forms a cornerstone of the US GCFR safety program. The project organization, experiment program, facility, helium system design, and schedule which have been selected to meet the objectives are described

  4. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  5. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  6. Test-driven development with Django

    CERN Document Server

    Harvey, Kevin

    2015-01-01

    This book is for Django developers with little or no knowledge of test-driven development or testing in general. Familiarity with the command line, setting up a Python virtual environment, and starting a Django project are assumed.

  7. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    International Nuclear Information System (INIS)

    Berglin, B.G.

    1998-01-01

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ''Mixer Pump Test Specification for Project W-151'' and Statement of Work 8K520-EMN-95-004 ''Mixer Pump Performance Demonstration at MASF'' in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work

  8. Development of real-time on-line vibration testing system for seismic experiments

    International Nuclear Information System (INIS)

    Horiuchi, T.; Nakagawa, M.; Kametani, M.

    1993-01-01

    An on-line vibration testing method is being developed for seismic experiments. This method combines computer simulation and an actuator for vibration testing of structures. A real-time, on-line testing system was developed to improve the method. In the system, the timing of the vibration testing and the computer simulation are the same. This allows time-dependent reaction forces, such as damping force, to be immediately considered in the computer simulation. The real-time system has many requirements, such as complicated matrix calculations within a small time step, and communication with outer devices like sensors and actuators through A/D and D/A converters. These functions arc accomplished by using a newly-developed, real-time controller that employs a parallel processing technique. A small structural model is used to demonstrate the system. The reliability and applicability of the system for seismic experiments can be demonstrated by comparing the results of the system and a shaking table, which are in almost agreement. (author)

  9. Study on operation I and C DCS test method of EPR project

    International Nuclear Information System (INIS)

    Meng Ying; Lv Zhihong; Huang Xinnian; Fan Haiying; Li Zhuojia; Xiao Shushu

    2014-01-01

    Through summarization and optimization of the method for operation I and C DCS test of the European pressurized reactor project, the conclusions play a guiding role on the operation I and C DCS test of the domestic advanced nuclear power plant. The study of the method focuses on the test platform, the test process and the optimization of method of operation I and C DCS test with the practical experience. The reasonable and reliable test method for operation I and C DCS test of the European pressurized reactor project is worthy of the reference and the development in the project of the domestic advanced nuclear power plant. (authors)

  10. Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool

    Science.gov (United States)

    Yang, Mo; Gui, Lin; Hu, Yefa; Ding, Guoping; Song, Chunsheng

    2018-03-01

    Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM), this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. And the finite element modal analysis model of the shafting is established. The results of the modified TMM and finite element analysis (FEA) show that the modified TMM can effectively predict the critical rotary speed of CFRP drive-line. And the critical rotary speed of CFRP drive-line is 20% higher than that of the original metal drive-line. Then, the vibration of the CFRP and the metal drive-line were tested. The test results show that application of the CFRP drive shaft in the drive-line can effectively reduce the vibration of the heavy-duty machine tool.

  11. Queer signs: The women of the British projective test movement.

    Science.gov (United States)

    Hubbard, Katherine

    2017-07-01

    As queer history is often hidden, historians must look for "signs" that hint at queer lives and experiences. When psychologists use projective tests, the search for queer signs has historically been more literal, and this was especially true in the homophobic practices of Psychology in the mid-twentieth century. In this paper, I respond to Elizabeth Scarborough's call for more analytic history about the lesser known women in Psychology's history. By focusing on British projective research conducted by lesbian psychologist June Hopkins, I shift perspective and consider, not those who were tested (which has been historically more common), but those who did the testing, and position them as potential queer subjects. After briefly outlining why the projective test movement is ripe for such analysis and the kinds of queer signs that were identified using the Rorschach ink blot test in the mid-twentieth century, I then present June Hopkins' (1969, 1970) research on the "lesbian personality." This work forms a framework upon which I then consider the lives of Margaret Lowenfeld, Ann Kaldegg, and Effie Lillian Hutton, all of whom were involved in the British projective test movement a generation prior to Hopkins. By adopting Hopkins' research to frame their lives, I present the possibility of this ambiguous history being distinctly queer. © 2017 Wiley Periodicals, Inc.

  12. 40 CFR 1051.305 - How must I prepare and test my production-line vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... production-line vehicles or engines? 1051.305 Section 1051.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Testing Production-Line Vehicles and Engines § 1051.305 How must I prepare and test my production...

  13. Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool

    Directory of Open Access Journals (Sweden)

    Mo Yang

    2018-03-01

    Full Text Available Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM, this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. And the finite element modal analysis model of the shafting is established. The results of the modified TMM and finite element analysis (FEA show that the modified TMM can effectively predict the critical rotary speed of CFRP drive-line. And the critical rotary speed of CFRP drive-line is 20% higher than that of the original metal drive-line. Then, the vibration of the CFRP and the metal drive-line were tested. The test results show that application of the CFRP drive shaft in the drive-line can effectively reduce the vibration of the heavy-duty machine tool. Keywords: CFRP drive-line system, Dynamic behavior, Transfer matrix, Vibration measurement

  14. Second Line of Defense, Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan, Buenos Aires, Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Bryan W.

    2012-08-23

    The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.

  15. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    International Nuclear Information System (INIS)

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  16. Coronal Physics and the Chandra Emission Line Project

    Science.gov (United States)

    Brickhouse, N. S.; Drake, J. J.

    2000-01-01

    With the launch of the Chandra X-ray Observatory, high resolution X-ray spectroscopy of cosmic sources has begun. Early, deep observations of three stellar coronal sources Capella, Procyon, and HR 1099 are providing not only invaluable calibration data, but also benchmarks for plasma spectral models. These models are needed to interpret data from stellar coronae, galaxies and clusters of galaxies, supernova, remnants and other astrophysical sources. They have been called into question in recent years as problems with understanding low resolution ASCA and moderate resolution Extreme Ultraviolet Explorer Satellite (EUVE) data have arisen. The Emission Line Project is a collaborative effort, to improve the models, with Phase I being the comparison of models with observed spectra of Capella, Procyon, and HR 1099. Goals of these comparisons are (1) to determine and verify accurate and robust diagnostics and (2) to identify and prioritize issues in fundamental spectroscopy which will require further theoretical and/or laboratory work. A critical issue in exploiting the coronal data for these purposes is to understand the extent, to which common simplifying assumptions (coronal equilibrium, negligible optical depth) apply. We will discuss recent, advances in our understanding of stellar coronae, in this context.

  17. A Study on the construction of 22.9 kV distribution test line of KEPCO

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Hi Kyun; Choi, Hung Sik; Hwang, Si Dole; Jung, Young Ho [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Kim, Dong Hwan; Choi, Chang Huk [Korea Power Engineering Company and Architecture Engineers (Korea, Republic of)

    1995-12-31

    In order to enhance the reliability of power supply and the quality of electricity, a study on the construction of 22.9 kV distribution test line was performed. The main objective of this study was to establish a construction plan and a basic design to perform the construction and the detailed design of the test line effectively. (author). 21 refs., 45 figs.

  18. Marviken test-data interpretation, second project

    International Nuclear Information System (INIS)

    Collen, J.; Johansson, A.

    1978-12-01

    A brief description is given of the investigations carried out and the corclusions drawn within the MARTIN-II project, which involved the evaluation and interpretation of the data from the full scale containment response tests at the Marviken Power Station. The data from the tests, which were completed in 1976, provide information about the periodic pressure oscillations and rapid pressure spikes induced in the pressure-suppression containment during study comprise the following items: - Influence of test parameters on pressure oscillations and pressure spikes - Pressure spikes in the wetwell pool - High frequency oscillations - Comparisons between single-pipe and multi-pipe data The study was carried out by Studsvik Energiteknik AB with consulting efforts from AB ASEA-ATOM. It was financed by the Swedish Nuclear Power Inspectorate. (Auth.)

  19. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  20. Electrostatic induction under the Tanashi test transmission line

    Energy Technology Data Exchange (ETDEWEB)

    Kitani, Y; Yokata, S

    1964-06-01

    Experimental results are given on the electrostatic voltage induced in small and medium-sized motorcars under the Tanashi 800 kV Test Transmission Line, which is of horizontal arrangement, 200 m span, four bundle conductors and average height of 13.52 m. The induced voltage was measured between 1600 and 3000 V under the line voltage of 520 kV. The voltage and current were measured with four kinds of model motorcars in air and water, and results of the measurements are compared with those of actual measurements with good agreements. The values of capacity and leakage resistance, whose parallel circuit was considered to represent an equivalent circuit of the motorcar, were measured with a Maxwell-Wien bridge at frequencies between 30 and 1000 c/s. It was found that the values at 60 c/s were measured to be approximately six or seven times higher than its values at 1000 c/s, and that new tires have higher conductivities than the old ones, reducing the electrostatic induction voltage by a large amount.

  1. Active solution of homography for pavement crack recovery with four laser lines.

    Science.gov (United States)

    Xu, Guan; Chen, Fang; Wu, Guangwei; Li, Xiaotao

    2018-05-08

    An active solution method of the homography, which is derived from four laser lines, is proposed to recover the pavement cracks captured by the camera to the real-dimension cracks in the pavement plane. The measurement system, including a camera and four laser projectors, captures the projection laser points on the 2D reference in different positions. The projection laser points are reconstructed in the camera coordinate system. Then, the laser lines are initialized and optimized by the projection laser points. Moreover, the plane-indicated Plücker matrices of the optimized laser lines are employed to model the laser projection points of the laser lines on the pavement. The image-pavement homography is actively determined by the solutions of the perpendicular feet of the projection laser points. The pavement cracks are recovered by the active solution of homography in the experiments. The recovery accuracy of the active solution method is verified by the 2D dimension-known reference. The test case with the measurement distance of 700 mm and the relative angle of 8° achieves the smallest recovery error of 0.78 mm in the experimental investigations, which indicates the application potentials in the vision-based pavement inspection.

  2. A process dissociation approach to objective-projective test score interrelationships.

    Science.gov (United States)

    Bornstein, Robert F

    2002-02-01

    Even when self-report and projective measures of a given trait or motive both predict theoretically related features of behavior, scores on the 2 tests correlate modestly with each other. This article describes a process dissociation framework for personality assessment, derived from research on implicit memory and learning, which can resolve these ostensibly conflicting results. Research on interpersonal dependency is used to illustrate 3 key steps in the process dissociation approach: (a) converging behavioral predictions, (b) modest test score intercorrelations, and (c) delineation of variables that differentially affect self-report and projective test scores. Implications of the process dissociation framework for personality assessment and test development are discussed.

  3. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  4. Metastatic non-small-cell lung cancer: consensus on pathology and molecular tests, first-line, second-line, and third-line therapy: 1st ESMO Consensus Conference in Lung Cancer; Lugano 2010

    DEFF Research Database (Denmark)

    Felip, E; Gridelli, C; Baas, P

    2011-01-01

    the conference, the expert panel prepared clinically relevant questions concerning five areas: early and locally advanced non-small-cell lung cancer (NSCLC), first-line metastatic NSCLC, second-/third-line NSCLC, NSCLC pathology and molecular testing, and small-cell lung cancer to be addressed through discussion......The 1st ESMO Consensus Conference on lung cancer was held in Lugano, Switzerland on 21 and 22 May 2010 with the participation of a multidisciplinary panel of leading professionals in pathology and molecular diagnostics, medical oncology, surgical oncology and radiation oncology. Before...... at the Consensus Conference. All relevant scientific literature for each question was reviewed in advance. During the Consensus Conference, the panel developed recommendations for each specific question. The consensus agreement on three of these areas: NSCLC pathology and molecular testing, the treatment of first-line...

  5. Project accent: graphite irradiated creep in a materials test reactor

    International Nuclear Information System (INIS)

    Brooking, M.

    2014-01-01

    Atkins manages a pioneering programme of irradiation experiments for EDF Energy. One of these projects is Project ACCENT, designed to obtain evidence of a beneficial physical property of the graphite, which may extend the life of the Advanced Gas-cooled Reactors (AGRs). The project team combines the in-house experience of EDF Energy with two supplier organisations (providing the material test reactors and testing facilities) and supporting consultancies (Atkins and an independent technical expert). This paper describes: - Brief summary of the Project; - Discussion of the challenges faced by the Project; and - Conclusion elaborating on the aims of the Project. These challenging experiments use bespoke technology and both un-irradiated (virgin) and irradiated AGR graphite. The results will help to better understand graphite irradiation-induced creep (or stress modified dimensional change) properties and therefore more accurately determine lifetime and safe operating envelopes of the AGRs. The first round of irradiation has been completed, with a second round about to commence. This is a key step to realising the full lifetime ambition for AGRs, demonstrating the relaxation of stresses within the graphite bricks. (authors)

  6. Influence of Projection Operator on Oxygen Line Shapes and its effect on Rosseland-Mean Opacity in Stellar Interiors

    Science.gov (United States)

    Gomez, Thomas; Nagayama, Taisukue; Kilcrease, David; Hansen, Stephanie; Montgomery, Mike; Winget, Don

    2018-01-01

    The Rosseland-Mean opacity (RMO) is an important quantity in determining radiation transport through stars. The solar-convection-zone boundary predicted by the standard solar model disagrees with helioseismology measurements by many sigma; a 14% increase in the RMO would resolve this discrepancy. Experiments at Sandia National Laboratories are now measuring iron opacity at solar-interior conditions, and significant discrepancies are already observed. Highly-ionized oxygen is one of the dominant contributions to the RMO. The strongest line, Lyman alpha, is at the peak of the Rosseland weighting function. The accuracy of line-broadening calculations has been called into question due to various experimental results and comparisons between theory. We have developed an ab-initio calculation to explore different physical effects, our current focus is treating penetrating collisions explicitly. The equation of motion used to calculate line shapes within the relaxation and unified theories includes a projection operator, which performs an average over plasma electron states; this is neglected due to past calculations approximate treatment of penetrations. We now include this projection term explicitly, which results in a significant broadening of spectral lines from highly-charged ions (low-Z elements are not much affected). The additional broadening raises the O Ly-alpha wing opacity by a factor of 5; we examine the consequences of this additional broadening on the Rosseland mean.

  7. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  8. Sex Differences in Objective and Projective Dependency Tests: A Meta-Analytic Review.

    Science.gov (United States)

    Bornstein, Robert F.

    1995-01-01

    A meta-analysis of 97 studies published since 1950 that assessed sex differences in scores on objective and projective dependency tests indicated that women consistently obtained higher dependency scores on objective tests, and men obtained higher scores on projective tests. Findings are discussed in terms of sex role socialization. (SLD)

  9. On-line optimal control improves gas processing

    International Nuclear Information System (INIS)

    Berkowitz, P.N.; Papadopoulos, M.N.

    1992-01-01

    This paper reports that the authors' companies jointly funded the first phase of a gas processing liquids optimization project that has the specific purposes to: Improve the return of processing natural gas liquids, Develop sets of control algorithms, Make available a low-cost solution suitable for small to medium-sized gas processing plants, Test and demonstrate the feasibility of line control. The ARCO Willard CO 2 gas recovery processing plant was chosen as the initial test site to demonstrate the application of multivariable on-line optimal control. One objective of this project is to support an R ampersand D effort to provide a standardized solution to the various types of gas processing plants in the U.S. Processes involved in these gas plants include cryogenic separations, demethanization, lean oil absorption, fractionation and gas treating. Next, the proposed solutions had to be simple yet comprehensive enough to allow an operator to maintain product specifications while operating over a wide range of gas input flow and composition. This had to be a supervisors system that remained on-line more than 95% of the time, and achieved reduced plant operating variability and improved variable cost control. It took more than a year to study various gas processes and to develop a control approach before a real application was finally exercised. An initial process for C 2 and CO 2 recoveries was chosen

  10. Testing and Commissioning of Lillgrund Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Poul Erik; Larsson, Aake; Jeppsson, Joakim; Toernkvist, Mattias (ed.) (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-04-15

    This report gives an overview of the tests carried out in the Lillgrund project. The report covers factory tests, site tests and the performance tests, which can be carried out during the defects liability period. The report describes tests relevant for the wind turbine generators, the electrical system and the foundations. On the whole, the Lillgrund test results have been satisfactory. One of the more problematic issues experienced were when the foundation interface verification showed that the bolts were not meeting the height requirements. Since this shortcoming was detected relatively early in the project life, it was possible to correct the misalignment and keep the additional costs to a minimum. From a management point of view, this highlighted the importance of clear and unambiguous interface specifications and to make sure that the project has a proper interface management function. According to the Contract, Vattenfall has the right to verify a number of performance parameters during the 5-year defect liability period. The performance tests include availability, power curve, electrical system losses and acoustic noise levels. The contract specifies the test criteria, the test methods and procedures and the penalty if the tests result in undesirable levels. In some cases, there is a financial incentive for the supplier if the tests show that the wind farm is performing better than stipulated in the contract. Lillgrund has performed very well thus far and Vattenfall has determined that the contractual performance requirements are being met. Vattenfall has, therefore, not requested to carry out any of these elective Performance Tests

  11. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

  12. Compared behaviour of stainless steel and titanium tests lines for a L.H.H. grill launcher

    International Nuclear Information System (INIS)

    Rey, G.; Briand, P.; David, C.; Lamboley, G.; Moulin, D.; Tonon, G.

    1982-09-01

    The choice of the material as first wall of a grill is of major importance. It must satisfy eventually conficting demands: (i) mean secondary emission coefficient low enough to avoid multipactor effect, (ii) low gas absorption and desorption and (iii) easy manufacturing. Then two test lines, one made of pure titanium, the other made of 304 L stainless steel have been tested at RF power greater than 300 kW during 150 ms at 1,25 GHz. As reported in a previous paper, 360 kW have been transmitted in the titanium test line without or with a very slight change in phase between incident an transmitted wave ( 0 ) after application of low pressure argon glow discharges. We now report the first results obtained on a stainless steel test line after the use of the same conditioning procedure (baking and argon glow discharges) and the effects of a static magnetic field superimposed in the reduced size sections of the line (B parallel to the large dimension of the waveguide)

  13. Reedsport PB150 Deployment and Ocean Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Phil [Ocean Power Technologies Inc., Pennington, NJ (United States)

    2016-06-03

    As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem was successfully integrated into the spar at the fabricator’s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.

  14. OCGen Module Mooring Project

    Energy Technology Data Exchange (ETDEWEB)

    McEntee, Jarlath [Ocean Renewable Power Company, LLC, Portland, ME (United States)

    2015-02-06

    Ocean Renewable Power Company's OCGen Module Mooring Project provided an extensive research, design, development, testing and data collection effort and analysis conducted with respect to a positively buoyant, submerged MHK device secured to the seabed using a tensioned mooring system. Different analytic tools were evaluated for their utility in the design of submerged systems and their moorings. Deployment and testing of a prototype OCGen® system provided significant data related to mooring line loads and system attitude and station keeping. Mooring line loads were measured in situ and reported against flow speeds. The Project made a significant step in the development of designs, methodologies and practices related to floating and mooring of marine hydrokinetic (MHK) devices. Importantly for Ocean Renewable Power Company, the Project provided a sound basis for advancing a technically and commercially viable OCGen® Power System. The OCGen® Power System is unique in the MHK industry and, in itself, offers distinct advantages of MHK devices that are secured to the seabed using fixed structural frames. Foremost among these advantages are capital and operating cost reductions and increased power extraction by allowing the device to be placed at the most energetic level of the water column.

  15. Verification test for on-line diagnosis algorithm based on noise analysis

    International Nuclear Information System (INIS)

    Tamaoki, T.; Naito, N.; Tsunoda, T.; Sato, M.; Kameda, A.

    1980-01-01

    An on-line diagnosis algorithm was developed and its verification test was performed using a minicomputer. This algorithm identifies the plant state by analyzing various system noise patterns, such as power spectral densities, coherence functions etc., in three procedure steps. Each obtained noise pattern is examined by using the distances from its reference patterns prepared for various plant states. Then, the plant state is identified by synthesizing each result with an evaluation weight. This weight is determined automatically from the reference noise patterns prior to on-line diagnosis. The test was performed with 50 MW (th) Steam Generator noise data recorded under various controller parameter values. The algorithm performance was evaluated based on a newly devised index. The results obtained with one kind of weight showed the algorithm efficiency under the proper selection of noise patterns. Results for another kind of weight showed the robustness of the algorithm to this selection. (orig.)

  16. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  17. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  18. Programmable pulse sequence generator with multiple output lines

    Science.gov (United States)

    Drabczyk, Hubert

    2006-10-01

    This paper presents a novel concept of pulse sequence generator and its prototype as an electronic circuit testing laboratory tool. The generator has multiple output lines and is capable of using control data defining different pulse sequences to be given to the outputs. It is also possible to use different voltage levels in output signal and switch output lines for reading data from driven system. The pulse sequence generator can be used for runtime environment simulation, as hardware tester or auxiliary tool in new designs. Important design factors were to keep cost of the tool low and allow integration with other projects by using flexible architecture. The prototype was based on universal programmer with adjustable power supply, '51 microcontroller and Altera Cyclone chip. The generator communicates witch PC computer via RS232 port. Dedicated software was developed in the course of this project, to control the tool and data transmission. The prototype confirmed the possibility to create an inexpensive multipurpose laboratory tool for programming, testing and simulation of digital devices.

  19. Project Physics Tests 4, Light and Electromagnetism.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 4 are presented in this booklet. Included are 70 multiple-choice and 22 problem-and-essay questions. Concepts of light and electromagnetism are examined on charges, reflection, electrostatic forces, electric potential, speed of light, electromagnetic waves and radiations, Oersted's and Faraday's work,…

  20. Time Resolved Spectrometry on the Test Beam Line at CTF3

    CERN Document Server

    Olvegård, M; Lefèvre, T; Döbert, S; Adli, E

    2009-01-01

    The CTF3 provides a high current (28 A) high frequency (12 GHz) electron beam, which is used to generate high power radiofrequency pulses at 12 GHz by decelerating the electrons in resonant structures. A Test Beam Line (TBL) is currently being built in order to prove the efficiency and the reliability of the RF power production with the lowest level of particle losses. As the beam propagates along the line, its energy spread grows up to 60%. For instrumentation, this unusual characteristic implies the development of new and innovative techniques. One of the most important tasks is to measure the beam energy spread with a fast time resolution. The detector must be able to detect the energy transient due to beam loading in the decelerating structures (nanosecond) but should also be capable to measure bunch-to-bunch fluctuations (12 GHz). This paper presents the design of the spectrometer line detectors.

  1. An analysis of unit tests of a flight software product line

    NARCIS (Netherlands)

    Ganesan, D.; Lindvall, M.; McComas, D.; Bartholomew, M.; Slegel, S.; Medina, B.; Krikhaar, R.; Verhoef, C.; Dharmalingam, G.; Montgomery, L.P.

    2013-01-01

    This paper presents an analysis of the unit testing approach developed and used by the Core Flight Software System (CFS) product line team at the NASA Goddard Space Flight Center (GSFC). The goal of the analysis is to understand, review, and recommend strategies for improving the CFS' existing unit

  2. Successful beam test of the SPS-to-LHC transfer line TI2

    CERN Multimedia

    2007-01-01

    Image of the first beam spot on the last BTV screen traversed by the beam during the TI 2 test.At 12:03:47 on 28 October a beam passed down the 2.7 km of the new SPS-to-LHC transfer line TI 2 at the first attempt, to within some 50 m of the LHC tunnel. After initial tuning, a range of measurements was carried out with a low intensity proton beam and preliminary analyses look good. After the test, no increase in radiation levels was found in either the LHC or ALICE, and the zones were rapidly opened again for access. As from next year TI 2 will regularly transport a beam from the SPS to the LHC injection point of Ring 1, near Point 2 (ALICE). The TI 8 transfer line, which will bring particles from the SPS to the injection point in Ring 2, near Point 8 (LHCb), was commissioned successfully with low intensity beam in 2004. The two LHC injection lines have a combined length of 5.6 km and comprise some seven hundred warm magnets. While a...

  3. Cross-Cultural Validation of TEMAS, a Minority Projective Test.

    Science.gov (United States)

    Costantino, Giuseppe; And Others

    The theoretical framework and cross-cultural validation of Tell-Me-A-Story (TEMAS), a projective test developed to measure personality development in ethnic minority children, is presented. The TEMAS test consists of 23 chromatic pictures which incorporate the following characteristics: (1) representation of antithetical concepts which the…

  4. Experimental Results of A1.2 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In order to meet the international interests in the multiple high-risk design extension conditions (DECs) raised after the Fukushima accident, KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In particular, passive safety systems are considered as the most promising alternatives to reinforce the safety and reliability of an ultimate heat removal system without any operator actions in the SBO transients. As one of the new safety improvement concepts to mitigate an SBO accident efficiently, a cooling and operational performance of the passive auxiliary feedwater system (PAFS) is investigated in the framework of the OECD-ATLAS project to produce clearer knowledge of the actual phenomena and to provide the best guidelines for accident management. As the second test of the OECD-ATLAS project, the A1.2 test was conducted to simulate a prolonged SBO with asymmetric secondary cooling through the supply of passive auxiliary feedwater only to SG-2. When the collapsed water level of steam generator reached a wide range of 25%, PAFS was actuated. PAFS played a key role in cooling down the primary system by the heat transfer and the natural circulation. With the actuation of PAFS, the fluid temperatures at the core inlet and outlet started to decrease without any excursion of the maximum heater surface temperature in the core. This integral effect test data of A1.2 test can be used to evaluate the prediction capability of existing safety analysis codes and identify any code deficiency for an SBO simulation with an operation of a passive system such as PAFS.

  5. Project Physics Tests 1, Concepts of Motion.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 1 are presented in this booklet, consisting of 70 multiple-choice and 20 problem-and-essay questions. Concepts of motion are examined with respect to velocities, acceleration, forces, vectors, Newton's laws, and circular motion. Suggestions are made for time consumption in answering some items. Besides…

  6. Parallelism at Cern: real-time and off-line applications in the GP-MIMD2 project

    International Nuclear Information System (INIS)

    Calafiura, P.

    1997-01-01

    A wide range of general purpose high-energy physics applications, ranging from Monte Carlo simulation to data acquisition, from interactive data analysis to on-line filtering, have been ported, or developed, and run in parallel on IBM SP-2 and Meiko CS-2 CERN large multi-processor machines. The ESPRIT project GP-MIMD2 has been a catalyst for the interest in parallel computing at CERN. The project provided the 128 processor Meiko CS-2 system that is now succesfully integrated in the CERN computing environment. The CERN experiment NA48 was involved in the GP-MIMD2 project since the beginning. NA48 physicists run, as part of their day-to-day work, simulation and analysis programs parallelized using the message passing interface MPI. The CS-2 is also a vital component of the experiment data acquisition system and will be used to calibrate in real-time the 13000 channels liquid krypton calorimeter. (orig.)

  7. An introduction to the Advanced Testing Line for Actinide Separations (ATLAS)

    International Nuclear Information System (INIS)

    Pope, N.G.; Yarbro, S.L.; Schreiber, S.B.; Day, R.S.

    1992-03-01

    The Advanced Testing Line for Actinide Separations (ATLAS) will evaluate promising plutonium recovery process modifications and new technologies. It combines advances in process chemistry, process control, process analytical chemistry, and process engineering. ATLAS has a processing capability equal to other recovery systems but without the pressure to achieve predetermined recovery quotas

  8. Project W-314 Polyurea Special Protective Coating (SPC) Test Report Chemical Compatibility and Physical Characteristics Testing

    International Nuclear Information System (INIS)

    MAUSER, R.W.

    2001-01-01

    This Engineering Test report outlines the results obtained from testing polyurea on its decon factor, tank waste compatibility, and adhesion strength when subjected to a high level of gamma radiation. This report is used in conjunction with RPP-7187 Project W-314 Pit Coatings Repair Requirements Analysis, to document the fact polyurea meets the project W-314 requirements contained in HNF-SD-W314-PDS-005 and is therefore an acceptable SPC for use in W-314 pit refurbishments

  9. Metro orange line BRT project evaluation.

    Science.gov (United States)

    2011-10-01

    In partnership with the Los Angeles County Metropolitan Transportation Authority (Metro) and the Federal Transit Administration (FTA), the National Bus Rapid Transit Institute (NBRTI) conducted an evaluation of the Metro Orange Line BRT service, whic...

  10. Groups of homeomorphisms of the line. Criteria for the existence of invariant and projectively invariant measures in terms of the commutator subgroup

    Energy Technology Data Exchange (ETDEWEB)

    Beklaryan, L A [Central Economics and Mathematics Institute, RAS, Moscow (Russian Federation)

    2014-12-31

    Existence criteria for invariant and projectively invariant measures are obtained for a group G of homeomorphisms of the line. These criteria are formulated in terms of the commutator subgroup [G,G]. For the special (but very important) case of groups of homeomorphisms of the line containing a freely acting element we obtain a criterion for the existence of a projectively invariant measure in the form of the absence of a special subgroup with two generators in which one of the generating elements is a freely acting element. Bibliography: 20 titles.

  11. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  12. Progress of the Hanford Bulk Vitrification Project ICVTM Testing Program

    International Nuclear Information System (INIS)

    Witwer, K.S.; Woolery, D.W.; Dysland, E.J.

    2006-01-01

    In June 2004, the Bulk Vitrification Project was initiated with the intent to engineer, construct and operate a full-scale bulk vitrification pilot-plant to treat low-activity tank waste from Hanford tank 241-S-109. The project, managed by CH2M HILL Hanford Group, Inc., and performed by AMEC Earth and Environmental, Inc. (AMEC), will develop and operate a full-scale demonstration facility to exhibit the effectiveness of the bulk vitrification process under actual operating conditions. Since project initiation, testing has been undertaken using crucible-scale, 1/6 linear (engineering) scale, and full-scale vitrification equipment. Crucible-scale testing, coupled with engineering-scale testing, helps establish process limitations of selected glass formulations. Full-scale testing provides critical design verification of the In Container Vitrification (ICV) TM process both prior to and during operation of the demonstration facility. Beginning in late 2004, several full-scale tests have been performed at AMEC's test site, located adjacent to the U.S. Department of Energy's Hanford Site, in Richland, WA. Early testing involved verification of melt startup methodology, followed by subsequent full-melt testing to validate critical design parameters and demonstrate the 'Bottom-Up, Feed While Melt' process. As testing has progressed, design improvements have been identified and incorporated into each successive test. Full scale testing at AMEC's test site is currently scheduled to complete in 2006, with continued full-scale operational testing at the demonstration facility on the Hanford Site starting in 2007. Additional engineering scale testing will validate recommended glass formulations that have been provided by the Pacific Northwest National Laboratory (PNNL). This testing is expected to continue through 2006. This paper discusses the progress of the full-scale and engineering scale testing performed to date. Crucible-scale testing, a critical step in developing

  13. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW's Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  14. Top-Down and Bottom-Up Approach for Model-Based Testing of Product Lines

    Directory of Open Access Journals (Sweden)

    Stephan Weißleder

    2013-03-01

    Full Text Available Systems tend to become more and more complex. This has a direct impact on system engineering processes. Two of the most important phases in these processes are requirements engineering and quality assurance. Two significant complexity drivers located in these phases are the growing number of product variants that have to be integrated into the requirements engineering and the ever growing effort for manual test design. There are modeling techniques to deal with both complexity drivers like, e.g., feature modeling and model-based test design. Their combination, however, has been seldom the focus of investigation. In this paper, we present two approaches to combine feature modeling and model-based testing as an efficient quality assurance technique for product lines. We present the corresponding difficulties and approaches to overcome them. All explanations are supported by an example of an online shop product line.

  15. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  16. Stability Test For Sorghum Mutant Lines Derived From Induced Mutations with Gamma-Ray Irradiation

    Directory of Open Access Journals (Sweden)

    S. Human

    2011-12-01

    Full Text Available Sorghum breeding program had been conducted at the Center for the Application of Isotopes and Radiation Technology, BATAN. Plant genetic variability was increased through induced mutations using gamma-ray irradiation. Through selection process in successive generations, some promising mutant lines had been identified to have good agronomic characteristics with high grain yield. These breeding lines were tested in multi location trials and information of the genotypic stability was obtained to meet the requirements for officially varietal release by the Ministry of Agriculture. A total of 11 sorghum lines and varieties consisting of 8 mutant lines derived from induced mutations (B-100, B-95, B-92, B-83, B-76, B-75, B-69 and Zh-30 and 3 control varieties (Durra, UPCA-S1 and Mandau were included in the experiment. All materials were grown in 10 agro-ecologically different locations namely Gunungkidul, Bantul, Citayam, Garut, Lampung, Bogor, Anyer, Karawaci, Cianjur and Subang. In each location, the local adaptability test was conducted by randomized block design with 3 replications. Data of grain yield was used for evaluating genotypic stability using AMMI approach. Results revealed that sorghum mutation breeding had generated 3 mutant lines (B-100, B-76 and Zh-30 exhibiting grain yield significantly higher than the control varieties. These mutant lines were genetically stable in all locations so that they would be recommended for official release as new sorghum varieties to the Ministry of Agriculture

  17. Design of a synchrotron radiation detector for the test beam lines at the Superconducting Super Collider Laboratory

    International Nuclear Information System (INIS)

    Hutton, R.D.

    1994-01-01

    As part of the particle- and momentum-tagging instrumentation required for the test beam lines of the Superconducting Super Collider (SSC), the synchrotron radiation detector (SRD) was designed to provide electron tagging at momentum above 75 GeV. In a parallel effort to the three test beam lines at the SSC, schedule demands required testing and calibration operations to be initiated at Fermilab. Synchrotron radiation detectors also were to be installed in the NM and MW beam lines at Femilab before the test beam lines at the SSC would become operational. The SRD is the last instrument in a series of three used in the SSC test beam fines. It follows a 20-m drift section of beam tube downstream of the last silicon strip detector. A bending dipole just in of the last silicon strip detector produces the synchrotron radiation that is detected in a 50-mm-square cross section NaI crystal. A secondary scintillator made of Bicron BC-400 plastic is used to discriminate whether it is synchrotron radiation or a stray particle that causes the triggering of the NaI crystal's photo multiplier tube (PMT)

  18. Steam line rupture experiments with the PPOOLEX test facility

    International Nuclear Information System (INIS)

    Laine, J.; Puustinen, M.

    2008-07-01

    The results of the steam line rupture experiment series in 2007 with the scaled down PPOOLEX test facility designed and constructed at Lappeenranta University of Technology are reported. The test facility is a closed stainless steel vessel divided into two compartments, dry well and wet well. Air was blown into the dry well compartment and from there through a DN200 blowdown pipe to the condensation pool. Altogether five experiments, each consisting of several blows (tests), were carried out. The main purpose of the experiment series was to study the initial phase of a postulated steam line break accident inside a BWR containment. Specifically, thermal stratification in the dry well compartment and ejection of water plug from the blowdown pipe were of interest. In addition, the effect of counterpressure on bubble dynamics was studied. A temperature difference of approximately 15 deg. C between the upper and lower part of the dry well was measured. In the wet well gas space, a temperature difference of more than 30 deg. C was registered. These were measured during the compression period of the tests. Towards the end of the tests the temperature differences tended to disappear. To get a more detailed picture of temperature distribution in the wet well, especially close to the water level, a dense net of measurements is required in future experiments. In longer experiments, heat conduction to structures and heat losses to surroundings should also be taken into account. Ejection of water plugs from the blowdown pipe did not cause notable loads to the structures due to the suppressing effect of the dry well compartment. The maximum measured pressure pulse at the pool bottom was only 10 kPa and the maximum strain amplitude at the pool bottom rounding was negligible both in axial and circumferential direction. As the counterpressure of the system increased, but the flow rate remained the same, the maximum size of the air bubbles at the blowdown pipe outlet got smaller and

  19. Steam line rupture experiments with the PPOOLEX test facility

    Energy Technology Data Exchange (ETDEWEB)

    Laine, J.; Puustinen, M. (Lappeenranta Univ. of Technology, Nuclear Safety Research Unit (Finland))

    2008-07-15

    The results of the steam line rupture experiment series in 2007 with the scaled down PPOOLEX test facility designed and constructed at Lappeenranta University of Technology are reported. The test facility is a closed stainless steel vessel divided into two compartments, dry well and wet well. Air was blown into the dry well compartment and from there through a DN200 blowdown pipe to the condensation pool. Altogether five experiments, each consisting of several blows (tests), were carried out. The main purpose of the experiment series was to study the initial phase of a postulated steam line break accident inside a BWR containment. Specifically, thermal stratification in the dry well compartment and ejection of water plug from the blowdown pipe were of interest. In addition, the effect of counterpressure on bubble dynamics was studied. A temperature difference of approximately 15 deg. C between the upper and lower part of the dry well was measured. In the wet well gas space, a temperature difference of more than 30 deg. C was registered. These were measured during the compression period of the tests. Towards the end of the tests the temperature differences tended to disappear. To get a more detailed picture of temperature distribution in the wet well, especially close to the water level, a dense net of measurements is required in future experiments. In longer experiments, heat conduction to structures and heat losses to surroundings should also be taken into account. Ejection of water plugs from the blowdown pipe did not cause notable loads to the structures due to the suppressing effect of the dry well compartment. The maximum measured pressure pulse at the pool bottom was only 10 kPa and the maximum strain amplitude at the pool bottom rounding was negligible both in axial and circumferential direction. As the counterpressure of the system increased, but the flow rate remained the same, the maximum size of the air bubbles at the blowdown pipe outlet got smaller and

  20. Wireless Sensor Network for Electric Transmission Line Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alphenaar, Bruce

    2009-06-30

    . On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization

  1. The Genomes OnLine Database (GOLD) v.4: status of genomic and metagenomic projects and their associated metadata

    Science.gov (United States)

    Pagani, Ioanna; Liolios, Konstantinos; Jansson, Jakob; Chen, I-Min A.; Smirnova, Tatyana; Nosrat, Bahador; Markowitz, Victor M.; Kyrpides, Nikos C.

    2012-01-01

    The Genomes OnLine Database (GOLD, http://www.genomesonline.org/) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2011, GOLD, now on version 4.0, contains information for 11 472 sequencing projects, of which 2907 have been completed and their sequence data has been deposited in a public repository. Out of these complete projects, 1918 are finished and 989 are permanent drafts. Moreover, GOLD contains information for 340 metagenome studies associated with 1927 metagenome samples. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about any (x) Sequence specification and beyond. PMID:22135293

  2. Optimised Environmental Test Approaches in the GOCE Project

    Science.gov (United States)

    Ancona, V.; Giordano, P.; Casagrande, C.

    2004-08-01

    The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) is dedicated to measuring the Earth's gravity field and modelling the geoid with extremely high accuracy and spatial resolution. It is the first Earth Explorer Core mission to be developed as part of ESA's Living Planet Programme and is scheduled for launch in 2006. The program is managed by a consortium of European companies: Alenia Spazio, the prime contractor, Astrium GmbH, the platform responsible, Alcatel Space Industries and Laben, suppliers of the main payloads, respectively the Electrostatic Gravity Gradiometer (EGG) and the Satellite to Satellite Tracking Instrument (SSTI), actually a precise GPS receiver. The GOCE Assembly Integration and Verification (AIV) approach is established and implemented in order to demonstrate to the customer that the satellite design meets the applicable requirements and to qualify and accept from lower level up to system level. The driving keywords of "low cost" and "short schedule" program, call for minimizing the development effort by utilizing off-the-shelf equipment combined with a model philosophy lowering the number of models to be used. The paper will deal on the peculiarities of the optimized environmental test approach in the GOCE project. In particular it introduces the logic of the AIV approach and describe the foreseen tests at system level within the SM environmental test campaign, outlining the Quasi Static test performed in the frame of the SM sine vibration tests, and the PFM environmental test campaign pinpointing the deletion of the Sine Vibration test on PFM model. Furthermore the paper highlights how the Model and Test Effectiveness Database (MATD) can be utilized for the prediction of the new space projects like GOCE Satellite.

  3. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  4. Accelerated Test Method for Corrosion Protective Coatings Project

    Science.gov (United States)

    Falker, John; Zeitlin, Nancy; Calle, Luz

    2015-01-01

    This project seeks to develop a new accelerated corrosion test method that predicts the long-term corrosion protection performance of spaceport structure coatings as accurately and reliably as current long-term atmospheric exposure tests. This new accelerated test method will shorten the time needed to evaluate the corrosion protection performance of coatings for NASA's critical ground support structures. Lifetime prediction for spaceport structure coatings has a 5-year qualification cycle using atmospheric exposure. Current accelerated corrosion tests often provide false positives and negatives for coating performance, do not correlate to atmospheric corrosion exposure results, and do not correlate with atmospheric exposure timescales for lifetime prediction.

  5. Medication monitoring and drug testing ethics project.

    Science.gov (United States)

    Payne, Richard; Moe, Jeffrey L; Sevier, Catherine Harvey; Sevier, David; Waitzkin, Michael

    2015-01-01

    In 2012, Duke University initiated a research project, funded by an unrestricted research grant from Millennium Laboratories, a drug testing company. The project focused on assessing the frequency and nature of questionable, unethical, and illegal business practices in the clinical drug testing industry and assessing the potential for establishing a business code of ethics. Laboratory leaders, clinicians, industry attorneys, ethicists, and consultants participated in the survey, were interviewed, and attended two face-to-face meetings to discuss a way forward. The study demonstrated broad acknowledgment of variations in the legal and regulatory environment, resulting in inconsistent enforcement of industry practices. Study participants expressed agreement that overtly illegal practices sometimes exist, particularly when laboratory representatives and clinicians discuss reimbursement, extent of testing, and potential business incentives with medical practitioners. Most respondents reported directly observing probable violations involving marketing materials, contracts, or, in the case of some individuals, directly soliciting people with offers of clinical supplies and other "freebies." While many study respondents were skeptical that voluntary standards alone would eliminate questionable business practices, most viewed ethics codes and credentialing as an important first step that could potentially mitigate uneven enforcement, while improving quality of care and facilitating preferred payment options for credentialed parties. Many were willing to participate in future discussions and industry-wide initiatives to improve the environment.

  6. Survey of transmission line corridors. [Data on delays in transmission line construction

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-05

    The intent of this study is to determine the extent of delays experienced in planning and constructing transmission lines in the continental United States. The reasons for the delays are identified for each line studied and their effect on the total electrical system is sought. Data was collected for 136 different lines either recently built or currently under study. Statistics were developed for each line in several categories and comparisons of lines delayed were made by company, area served and generation capacity. From the study presented here it was found that: right-of-way acquisition procedures including condemnation and easement negotiation practices delay more projects than local, state and federal regulatory requirements combined; load growth reductions particularly in the east have reduced the impact of regulatory delays; the south, southeast and southwestern areas of the country experience fewer delays in constructing transmission lines than the more populated states, and the cost for corridor delays was responded to for only 17 of the 142 projects surveyed. By far the most costly delay is the expense of condemning land for transmission right-of-way.

  7. Coastal Ocean Ecosystem Dynamics Imager Pointing Line-of-Sight Solution Development and Testing

    Data.gov (United States)

    National Aeronautics and Space Administration — A stable pointing line of sight solution is developed and tested in support of the Coastal Ocean Ecosystem Dynamics Imager for the GEOstationary Coastal and Air...

  8. Math Fact Strategies Research Project

    Science.gov (United States)

    Boso, Annie

    2011-01-01

    An action research project was conducted in order to determine effective math fact strategies for first graders. The traditional way of teaching math facts included using timed tests and flashcards, with most students counting on their fingers or a number line. Six new research-based strategies were taught and analyzed to decide which methods…

  9. Environmental assessment and finding of no significant impact: Hungry Horse--Columbia Falls line rebuild and relocation project

    International Nuclear Information System (INIS)

    1993-09-01

    Bonneville Power Administration (BPA) has identified a need to rebuild the Hungry Horse-Columbia Falls 115,000-volt (115-kV) transmission line to 230-kV. This line supplies power to customers in the area of Columbia Falls, Montana, and integrates generation at the US Bureau of Reclamation's (USBR) Hungry Horse Dam into BPA's transmission grid. There are several problems with the existing system. The Hungry Horse-Columbia Falls 1 15-kV line is 45 years old and requires excessive maintenance. The USBR has decided to replace their aging 115-kV transformers at the dam with 230-kV transformers, which also would increase their operational flexibility. With the small conductor size and voltage of the line presently being used, significant amounts of energy are lost as the power moves across the line. Transformer failure at Hungry Horse Dam has led to joint planning between BPA and the USBR. (USBR and the US Forest Service are cooperating agencies on the proposed project.) The proposal to eliminate the 115-kV equipment and convert to 230-kV operation was the least costly of the options studied. By rebuilding the line, maintenance costs (and time required for outages) would be reduced. The increased generation at the USBR dam would be safely and consistently transmitted over the improved system, and less energy would be lost from the line, a cost and energy savings

  10. The stripping foil test stand in the Linac4 transfer line

    CERN Document Server

    Weterings, W; Noulibos, R; Sillanoli, Y; van Trappen, P

    2015-01-01

    The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton synchrotron booster (PSB) with a new H− charge-exchange injection system. It will include a stripping foil, to convert H− into protons by stripping off the electrons. To gain experience with these very fragile foils, prior to the installation in the PSB, and test different foil materials and thicknesses, lifetimes of the foils, the foil changing mechanism and interlocking functions, a stripping foil test stand will be installed in the L4 transfer line in 2015. This paper describes the mechanical design of the system and discusses the test possibilities and parameters.

  11. The stripping foil test stand in the Linac4 transfer line

    International Nuclear Information System (INIS)

    Weterings, W.; Bracco, C.; Noulibos, R.; Sillanoli, Y.; Trappen van, P.

    2015-01-01

    The 160 MeV H - beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton synchrotron booster (PSB) with a new H - charge-exchange injection system. It will include a stripping foil, to convert H - into protons by stripping off the electrons. To gain experience with these very fragile foils, prior to the installation in the PSB, and test different foil materials and thicknesses, lifetimes of the foils, the foil changing mechanism and interlocking functions, a stripping foil test stand will be installed in the L4 transfer line in 2015. This paper describes the mechanical design of the system and discusses the test possibilities and parameters. (author)

  12. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    Science.gov (United States)

    Liolios, Konstantinos; Chen, I-Min A.; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Philip; Markowitz, Victor M.; Kyrpides, Nikos C.

    2010-01-01

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification. GOLD is available at: http://www.genomesonline.org and has a mirror site at the Institute of Molecular Biology and Biotechnology, Crete, Greece, at: http://gold.imbb.forth.gr/ PMID:19914934

  13. On-line testing of nuclear plant temperature and pressure instrumentation and other critical plant equipment. IAEA regional workshop. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    Under European regional TC project RER/4/011, IAEA and VUJE Training centre organized a workshop on On-line Testing of Nuclear Power Plant Temperature and Pressure Instrumentation and Other Critical Plant Equipment in Trnava, Slovak Republic, from 25 to 29 May 1998. The objective of the workshop was to review the state-of-the-art in NPP instrumentation, cover typical instrumentation problems and solutions, describe technical and regulatory requirements for verifying the performance of nuclear power plant instrumentation, describe new methods developed and applied in NPPs for on-line verification and performance of instrumentation and present new techniques using existing instrumentation to identify the on-set problems in the plant electrical, mechanical and thermal hydraulic systems. Particular emphasis was placed on temperature measurements by Resistance Temperature Detectors (RTDs) and thermocouples and pressure measurements using motion-balanced and forced-balanced pressure transmitters. This proceedings includes papers presented by the invited speakers and the participants each with an abstract as wells as a summary of the Round-Table discussions Refs, figs, tabs

  14. On-line testing of nuclear plant temperature and pressure instrumentation and other critical plant equipment. IAEA regional workshop. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Under European regional TC project RER/4/011, IAEA and VUJE Training centre organized a workshop on On-line Testing of Nuclear Power Plant Temperature and Pressure Instrumentation and Other Critical Plant Equipment in Trnava, Slovak Republic, from 25 to 29 May 1998. The objective of the workshop was to review the state-of-the-art in NPP instrumentation, cover typical instrumentation problems and solutions, describe technical and regulatory requirements for verifying the performance of nuclear power plant instrumentation, describe new methods developed and applied in NPPs for on-line verification and performance of instrumentation and present new techniques using existing instrumentation to identify the on-set problems in the plant electrical, mechanical and thermal hydraulic systems. Particular emphasis was placed on temperature measurements by Resistance Temperature Detectors (RTDs) and thermocouples and pressure measurements using motion-balanced and forced-balanced pressure transmitters. This proceedings includes papers presented by the invited speakers and the participants each with an abstract as wells as a summary of the Round-Table discussions

  15. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  16. A "Projective" Test of the Golden Section Hypothesis.

    Science.gov (United States)

    Lee, Chris; Adams-Webber, Jack

    1987-01-01

    In a projective test of the golden section hypothesis, 24 high school students rated themselves and 10 comic strip characters on basis of 12 bipolar constructs. Overall proportion of cartoon figures which subjects assigned to positive poles of constructs was very close to golden section. (Author/NB)

  17. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  18. Project of the JINR heavy ion synchrotron on-line control system

    International Nuclear Information System (INIS)

    Glejbman, Eh.M.; Zhabitskij, V.M.; Ivanov, I.N.

    1983-01-01

    Description of the project of the JINR heavy ion synchrotron (HIS) on-line control system (OCS) which is a strong-focusing synchrotron designed for avarage energies, is given. Complete average stream of data from HIS constitutes approximately 500 byte/s, when operation cycle is 0.33 s. The structure of HIS OCS is a two-hierarchy system with the distributed processing and control, built using modular principle. The first, lower hierarchy level forms eight subsystems, each of them is oriented for automation of concrete functionally-technological system of the accelerator. The higher hierarchy is the central complex computer which is a multimicroprocessor computer. The hardware of HIS OCS is envisaged to be realized on the base of CAMAC moduls. HIS OCS software will be disigned as the SM computer specialized real-time system supplemented with applied programs and language interpreter for the accelerator control

  19. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  20. Monitoring of Bridges by a Laser Pointer: Dynamic Measurement of Support Rotations and Elastic Line Displacements: Methodology and First Test.

    Science.gov (United States)

    Artese, Serena; Achilli, Vladimiro; Zinno, Raffaele

    2018-01-25

    Deck inclination and vertical displacements are among the most important technical parameters to evaluate the health status of a bridge and to verify its bearing capacity. Several methods, both conventional and innovative, are used for structural rotations and displacement monitoring; however, none of these allow, at the same time, precision, automation, static and dynamic monitoring without using high cost instrumentation. The proposed system uses a common laser pointer and image processing. The elastic line inclination is measured by analyzing the single frames of an HD video of the laser beam imprint projected on a flat target. For the image processing, a code was developed in Matlab ® that provides instantaneous rotation and displacement of a bridge, charged by a mobile load. An important feature is the synchronization of the load positioning, obtained by a GNSS receiver or by a video. After the calibration procedures, a test was carried out during the movements of a heavy truck maneuvering on a bridge. Data acquisition synchronization allowed us to relate the position of the truck on the deck to inclination and displacements. The inclination of the elastic line at the support was obtained with a precision of 0.01 mrad. The results demonstrate the suitability of the method for dynamic load tests, and the control and monitoring of bridges.

  1. Monitoring of Bridges by a Laser Pointer: Dynamic Measurement of Support Rotations and Elastic Line Displacements: Methodology and First Test

    Directory of Open Access Journals (Sweden)

    Serena Artese

    2018-01-01

    Full Text Available Deck inclination and vertical displacements are among the most important technical parameters to evaluate the health status of a bridge and to verify its bearing capacity. Several methods, both conventional and innovative, are used for structural rotations and displacement monitoring; however, none of these allow, at the same time, precision, automation, static and dynamic monitoring without using high cost instrumentation. The proposed system uses a common laser pointer and image processing. The elastic line inclination is measured by analyzing the single frames of an HD video of the laser beam imprint projected on a flat target. For the image processing, a code was developed in Matlab® that provides instantaneous rotation and displacement of a bridge, charged by a mobile load. An important feature is the synchronization of the load positioning, obtained by a GNSS receiver or by a video. After the calibration procedures, a test was carried out during the movements of a heavy truck maneuvering on a bridge. Data acquisition synchronization allowed us to relate the position of the truck on the deck to inclination and displacements. The inclination of the elastic line at the support was obtained with a precision of 0.01 mrad. The results demonstrate the suitability of the method for dynamic load tests, and the control and monitoring of bridges.

  2. On-line testing of response time and calibration of temperature and pressure sensors in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    1995-01-01

    Periodic calibrations and response time measurements are necessary for temperature and pressure sensors in the safety systems of nuclear power plants. Conventional measurement methods require the test to be performed at the sensor location or involve removing the sensor from the process and performing the tests in a laboratory or on the bench. The conventional methods are time consuming and have the potential of causing wear and tear on the equipment, can expose the test personnel to radiation and other harsh environments, and increase the length of the plant outage. Also, the conventional methods do not account for the installation effects which may have an influence on sensor performance. On-line testing methods alleviate these problems by providing remote sensor response time and calibration capabilities. For temperature sensors such as Resistance Temperature Detectors (RTDs) and thermocouples, an on-line test method called the Loop Current Step Response (LCSR) technique has been developed, and for pressure transmitters, an on-line method called noise analysis which was available for reactor diagnostics was validated for response time testing applications. Both the LCSR and noise analysis tests are performed periodically in U.S. nuclear power plants to meet the plant technical specification requirements for response time testing of safety-related sensors. Automated testing of the calibration of both temperature and pressure sensors can be accomplished through an on-line monitoring system installed in the plant. The system monitors the DC output of the sensors over the fuel cycle to determine if any calibration drift has occurred. Changes in calibration can be detected using signal averaging and intercomparison methods and analytical redundancy techniques. (author)

  3. Development and Evaluation of an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    Science.gov (United States)

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    An on-line module on disease prevention was created for 4-H volunteer leaders who work with livestock projects in Washington to better prepare them to teach youth about bio-security and its importance in 4-H livestock projects. Evaluation of the module and usage statistics since the module's debut were collected and evaluated. The module increases…

  4. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  5. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  6. Dielectric strength test to protection elements for live lines works

    Directory of Open Access Journals (Sweden)

    Carlos Eduardo Pinto-Salamanca

    2017-06-01

    Full Text Available This paper presents the design and assembly of a system of tests of sustained voltage to elements and equipment used in live line maneuvers through tests on gloves and dielectric rods, as these are the first points of contact to ensure safe operations. It means an advance for the creation of a laboratory certified in this type of tests at Universidad Pedagógica y Tecnológica de Colombia (UPTC Faculty of Duitama, considering that currently there are not laboratories that provide this service in Boyacá and Casanare. Dielectric strength tests were performed on personal protection elements and equipment under the parameters of ASTM D120, ASTM F496, ISO 60903, ASTM-F711 and IEEE 978, developing an assembly for testing gloves and dielectric rods with voltage levels up to 15 kV. The results validate the proposed system to outlook of circuit design and implementation, where tests were performed to establish dielectric capacities, in operating under open circuit conditions, with resistive load or short circuit. The compliance with the regulations established under the test sequences of safety parameters for the system and the follow-up to the tests was verified through the use of a management system for the generation of concepts of approval or rejection of the tested elements.

  7. Off-line testing of multifunctional surfaces for metal forming applications

    DEFF Research Database (Denmark)

    Godi, A.; Grønbæk, J.; De Chiffre, L.

    2015-01-01

    In this paper, Bending-Under-Tension, an off-line test method simulating deep-drawing, is chosen for investigating the effectiveness of multifunctional (MUFU) surfaces in metal forming operations. Four different MUFU surfaces, characterized by a plateau bearing area and grooves for lubricant...... retention, are manufactured, together with two polished references. During the tests, surface texture is the only variable. The results show how MUFU surfaces perform better than the polished references, which produce severe galling, while MUFU surfaces with low bearing area display no clear evidence...... of galling. Metal-to-metal contact occurs anyway, but the strip material is pulverized and deposited onto the tool instead of cold-welding to it. The pockets create a discontinuity on the texture hindering pick-up propagation....

  8. Project Physics Tests 3, The Triumph of Mechanics.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 3 are presented in this booklet. Included are 70 multiple-choice and 20 problem-and-essay questions. Concepts of mechanics are examined on energy, momentum, kinetic theory of gases, pulse analyses, "heat death," water waves, power, conservation laws, normal distribution, thermodynamic laws, and…

  9. Spectral Filtering Criteria for U-Band Test Light for In-Service Line Monitoring in Optical Fiber Networks

    Science.gov (United States)

    Honda, Nazuki; Izumita, Hisashi; Nakamura, Minoru

    2006-06-01

    In the fiber-to-the-home era, thousands of optical fibers will have to be accommodated in the central offices of optical access networks. To reduce maintenance costs and improve the service reliability of optical fiber networks, the authors must develop an optical fiber line testing system with a function for in-service line monitoring that uses a test light with a wavelength different from the communication light wavelength. To monitor an in-service line in an optical network, the effective rejection ratio of the test light must be taken into account. This ratio depends on the spectrum of the test light from the optical time-domain reflectometer and the rejection band of the filter in front of the optical network unit. The dependence of the effective rejection ratio as a function of the sideband suppression ratio (SBSR) and of the ratio of the rejection band to the bandwidth of the sideband noise d/D is clarified. When d/D =0.1 and the target effective rejection ratio of the filter is -40 dB, the SBSR and the filter loss of the termination cable must be -70 and -43 dB, respectively, or the SBSR must be -80 dB. When d/D service line monitoring for a 10-Gb/s transmission using a 1650-nm test light with an SBSR of -80 dB is also demonstrated.

  10. High Intensity Beam Test of Low Z Materials for the Upgrade of SPS-to-LHC Transfer Line Collimators and LHC Injection Absorbers

    CERN Document Server

    Maciariello, Fausto; Butcher, Mark; Calviani, Marco; Folch, Ramon; Kain, Verena; Karagiannis, Konstantinos; Lamas Garcia, Inigo; Lechner, Anton; Nuiry, Francois-Xavier; Steele, Genevieve; Uythoven, Jan

    2016-01-01

    In the framework of the LHC Injector Upgrade (LIU) and High-Luminosity LHC (HL-LHC) project, the collimators in the SPS-to LHC transfer lines will undergo important modifications. The changes to these collimators will allow them to cope with beam brightness and intensity levels much increased with respect to their original design parameters: nominal and ultimate LHC. The necessity for replacement of the current materials will need to be confirmed by a test in the High Radiation to Materials (HRM) facility at CERN. This test will involve low Z materials (such as Graphite and 3-D Carbon/Carbon composite), and will recreate the worst case scenario those materials could see when directly impacted by High luminosity LHC (HL-LHC) or Batch Compression Merging and Splitting (BCMS) beams. Thermo-structural simulations used for the material studies and research, the experiment preparation phase, the experiment itself, pre irradiation analysis (including ultrasound and metrology tests on the target materials), the resul...

  11. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  12. An Advanced Actuator Line Method for Wind Energy Applications and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    Churchfield, Matthew J.; Schreck, Scott; Martinez-Tossas, Luis A.; Meneveau, Charles; Spalart, Philippe R.

    2017-01-09

    The actuator line method to represent rotor aerodynamics within computational fluid dynamics has been in use for over a decade. This method applies a body force to the flow field along rotating lines corresponding to the individual rotor blades and employs tabular airfoil data to compute the force distribution. The actuator line method is attractive because compared to blade-resolved simulations, the required mesh is much simpler and the computational cost is lower. This work proposes a higher fidelity variant of the actuator line method meant to fill the space between current actuator line and blade-resolved simulations. It contains modifications in two key areas. The first is that of freestream velocity vector estimation along the line, which is necessary to compute the lift and drag along the line using tabular airfoil data. Most current methods rely on point sampling in which the location of sampling is ambiguous. Here we test a velocity sampling method that uses a properly weighted integral over space, removing this ambiguity. The second area of improvement is the function used to project the one-dimensional actuator line force onto the three-dimensional fluid mesh as a body force. We propose and test a projection function that spreads the force over a region that looks something like a real blade with the hope that it will produce the blade local and near wake flow features with more accuracy and higher fidelity. Our goal is that between these two improvements, not only will the flow field predictions be enhanced, but also the spanwise loading will be made more accurate. We refer to this combination of improvements as the advanced actuator line method. We apply these improvements to two different wind turbine cases. Although there is a strong wind energy motivation in our work, there is no reason these advanced actuator line ideas cannot be used in other applications, such as helicopter rotors.

  13. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  14. On-line fission products measurements during a PWR severe accident: the French DECA-PF project

    Energy Technology Data Exchange (ETDEWEB)

    Ducros, G.; Allinei, P.G.; Roure, C. [CEA, DEN, F-13108 Saint-Paul-lez-Durance, (France); Rozel, C. [EDF SEPTEN, 12-14 Avenue Dutrievoz, F-69628, Villeurbanne, (France); Blanc De Lanaute, N. [CANBERRA, 1 rue des Herons, F-78182, Saint Quentin en Yvelines, (France); Musoyan, G. [AREVA, Tour AREVA, 1 place Jean Millier, F-92084 Paris La Defense Cedex, (France)

    2015-07-01

    Following the Fukushima accident, a lot of recommendations was drawn by international organizations (IAEA, OECD, NUGENIA network...) in order to improve the safety in such accidental conditions and mitigate their consequences. One of these recommendations was to improve the robustness of the instrumentation, which was dramatically lacking at Fukushima, as well as to better determine the Source Term involved in nuclear accident. The DECA-PF project (Diagnosis of a degraded reactor core through Fission Product measurements) was elaborated in this context and selected as one of 21 collaborative R and D projects in the field of nuclear safety and radioprotection, funded in May 2013 by the French National Research Agency. Over the months following the Fukushima accident, a CEA crisis team was held in order to analyze on-line the situation taking into account the data delivered by TEPCO and other organizations. Despite the difficulties encountered concerning the reliability of these data, the work performed showed the high capacity of Fission Products (FP) measurements to get a diagnosis relative to the status of the reactors and the spent fuel pools (SFP). Based on these FP measurements, it was possible to conclude that the main origin of the releases was coming from the cores and not from the SFP, in particular for SFP-4 which was of high concern, and that the degradation level of the reactors was very large, including probably an extensive core melting. To improve the reliability of this kind of diagnosis, the necessity to get such measurements as soon as possible after the accident and as near as possible from the reactor was stressed. In this way the present DECA-PF project intends to develop a new and innovative instrumentation taking into account the design of the French nuclear power plants on which sand bed filters have been implemented for severe accident management. Three complementary techniques, devoted to measure the FP release on-line, are being studied

  15. Project Physics Tests 2, Motion in the Heavens.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 2 are presented in this booklet. Included are 70 multiple-choice and 22 problem-and-essay questions. Concepts of motion in the heavens are examined for planetary motions, heliocentric theory, forces exerted on the planets, Kepler's laws, gravitational force, Galileo's work, satellite orbits, Jupiter's…

  16. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  17. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  18. Ex-vessel debris coolability test during severe accident (COTELS project)

    International Nuclear Information System (INIS)

    Ogasawara, H.

    1998-01-01

    The objectives of the COTELS project are for severe accident management, to investigate phenomena of ex-vessel fuel-coolant interactions after reactor pressure vessel (RPV) failure and to investigate molten core-concrete interaction when coolant is injected onto molten debris. The project has being cooperated with the National Nuclear Center in the Republic of Kazakstan from 1994 to 1997 under the sponsorship of the Ministry of International Trade and Industry of Japan. Total programs are composed with the following tests. (1) Test 01 was meant to observe flow mode of falling debris. (2) Test A was meant to investigate phenomena of fuel-coolant interactions when molten debris falls into a coolant pool. (3) Test B/C investigated fuel coolant interactions and molten core-concrete interaction when coolant is injected onto debris. Detail data evaluation is underway. The following results were thus for obtained: (1) It was confirmed in Test 01 series that about 60 kg of UO 2 mixture was completely melted and fallen as a continuous jet. (2) No energetic fuel-coolant interaction was observed both in Test A and B series. (3) Debris in which decay heat was simulated was cooled by water injection in Test C series

  19. New Options for Usability Testing Projects in Business Communication Courses

    Science.gov (United States)

    Jameson, Daphne A.

    2013-01-01

    The increasing availability of recording technologies makes it easier to include usability testing projects in business communication courses. Usability testing is a method of discovering whether people can navigate, read, and understand a print or electronic communication well enough to achieve a particular purpose in a reasonable time frame.…

  20. Respirometry-based on-line model parameter estimation at a full-scale WWTP

    NARCIS (Netherlands)

    Spanjers, H.; Patry, G.G.; Keesman, K.J.

    2002-01-01

    This paper describes part of a project to develop a systematic approach to knowledge extraction from on-line respirometric measurements in support of wastewater treatment plant control and operation. The paper deals with the following issues: (1) test of the implementation of an automatic set-up

  1. Note: An online testing method for lifetime projection of high power light-emitting diode under accelerated reliability test.

    Science.gov (United States)

    Chen, Qi; Chen, Quan; Luo, Xiaobing

    2014-09-01

    In recent years, due to the fast development of high power light-emitting diode (LED), its lifetime prediction and assessment have become a crucial issue. Although the in situ measurement has been widely used for reliability testing in laser diode community, it has not been applied commonly in LED community. In this paper, an online testing method for LED life projection under accelerated reliability test was proposed and the prototype was built. The optical parametric data were collected. The systematic error and the measuring uncertainty were calculated to be within 0.2% and within 2%, respectively. With this online testing method, experimental data can be acquired continuously and sufficient amount of data can be gathered. Thus, the projection fitting accuracy can be improved (r(2) = 0.954) and testing duration can be shortened.

  2. BWR recirculation loop discharge line break LOCA tests with break areas of 50 and 100% assuming HPCS failure at ROSA-III test facility

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Tasaka, Kanji; Yonomoto, Taisuke; Anoda, Yoshinari; Kumamaru, Hiroshige; Nakamura, Hideo; Murata, Hideo; Shiba, Masayoshi; Iriko, Masanori.

    1985-03-01

    This report presents the experimental results of RUN 962 and RUN 963 in ROSA-III program, which are 50 and 100 % break LOCA tests at the BWR recirculation pump discharge line, respectively. The ROSA-III test facility simulates a volumetrically scaled (1/424) BWR system and has four half-length electrically heated fuel bundles, two active recirculation loops, three types of ECCSs and steam and feedwater systems. The experimental data of RUN 962 and RUN 963 were compared with those of RUN 961, a 200 % discharge line break test to study the break area effects on the transient thermal hydraulic phenomena. The least flow areas at the jet pump drive nozzles and recirculation pump discharge nozzle in the broken recirculation loop limitted the discharge flows from the pressure vessel and the depressurization rate in the 100 and 200 % break tests, whereas the least flow area at break nozzle limitted the depressurization rate in the 50 % break test. The highest PCT was observed in the 50 % break test among the three tests. (author)

  3. Official emblem of the Apollo Soyuz Test Project

    Science.gov (United States)

    1974-01-01

    This is the Official emblem of the Apollo Soyuz Test Project (ASTP) chosen by NASA and the Soviet Academy of Sciences. Of circular design, the emblem has the words Apollo in English and Soyuz in Russian around a center disc which depicts the two spacecraft docked together in Earth orbit. The Russian word 'soyuz' means 'union' in English.

  4. The Cosmetics Europe strategy for animal-free genotoxicity testing: project status up-date.

    Science.gov (United States)

    Pfuhler, S; Fautz, R; Ouedraogo, G; Latil, A; Kenny, J; Moore, C; Diembeck, W; Hewitt, N J; Reisinger, K; Barroso, J

    2014-02-01

    The Cosmetics Europe (formerly COLIPA) Genotoxicity Task Force has driven and funded three projects to help address the high rate of misleading positives in in vitro genotoxicity tests: The completed "False Positives" project optimized current mammalian cell assays and showed that the predictive capacity of the in vitro micronucleus assay was improved dramatically by selecting more relevant cells and more sensitive toxicity measures. The on-going "3D skin model" project has been developed and is now validating the use of human reconstructed skin (RS) models in combination with the micronucleus (MN) and Comet assays. These models better reflect the in use conditions of dermally applied products, such as cosmetics. Both assays have demonstrated good inter- and intra-laboratory reproducibility and are entering validation stages. The completed "Metabolism" project investigated enzyme capacities of human skin and RS models. The RS models were shown to have comparable metabolic capacity to native human skin, confirming their usefulness for testing of compounds with dermal exposure. The program has already helped to improve the initial test battery predictivity and the RS projects have provided sound support for their use as a follow-up test in the assessment of the genotoxic hazard of cosmetic ingredients in the absence of in vivo data. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Applicability test of glass lining material for high-temperature acidic solutions of sulfuric acid in thermochemical water-splitting IS process

    International Nuclear Information System (INIS)

    Iwatsuki, Jin; Tanaka, Nobuyuki; Terada, Atsuhiko; Onuki, Kaoru; Watanabe, Yutaka

    2010-01-01

    A key issue for realizing the thermochemical IS process for hydrogen production is the selection of materials for working with high-temperature acidic solutions of sulfuric acid and hydriodic acid. Glass lining material is a promising candidate, which is composed of steel having good strength and glass having good corrosion resistance. Since the applicability of glass lining material depends strongly on the service condition, corrosion tests using glass used in glass lining material and heat cycle tests using glass lining piping were carried out to examine the possibility of using the glass lining material with high-temperature acidic solutions of sulfuric acid. It was confirmed that the glass lining materials exhibited sufficient corrosion resistance and heat resistance in high-temperature sulfuric acid of the IS process. (author)

  6. Testing nanomaterial toxicity in unicellular eukaryotic algae and fish cell lines.

    Science.gov (United States)

    Kroll, Alexandra; Kühnel, Dana; Schirmer, Kristin

    2013-01-01

    Nanoecotoxicology as a sub-discipline of ecotoxicology aims to identify and predict effects elicited on ecosystems by nano-sized materials (NM). Two key groups of model organisms in this context are algae and fish. In this chapter, we present considerations for testing NM with respect to their impact on unicellular algae and cell lines derived from various organs of fish.Based on currently available literature on NM effects in unicellular algae and fish cell lines, and our own experience, we provide guidance on test design, including principle test considerations, materials, NM presentation to cells, exposure, bioavailability, and effect assessment. Assessment needs to be based on a meaningful choice of exposure scenario(s) related to the research question. As a first step, one needs to address whether effects of NMs are to be investigated under environmentally relevant or probable conditions, which may include processes such as agglomeration, or whether NM effects from mono-dispersed particles are of interest, which may require special steps to ensure stable NM suspension. Moreover, whether effects on cells are to be studied in the short- or long-term is important with regard to experimental design. Preparation of NM suspensions, which can be done in aqueous media different from the exposure medium, is addressed with regard to energy input, sterility (as required for algae and fish cell exposure) and particle purity.Specified for the two model systems, algae and fish cell lines, availability and choice of culture media are presented and discussed with regard to impact on NM behavior. Light, temperature, and agitation, which are variables during exposure, are discussed. We further provide guidance on the characterization of the NM in the chosen aqueous exposure media regarding size, zeta potential and electrophoretic mobility. The state of NM in exposure media is decisive for their bioavailability and therefore for potential particle effects. Therefore, we present

  7. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  8. An Installation of IPS Bypass Line at the Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Young; Ahn, G. H.; Lee, M.; Kim, M. S.; Cho, S. H.; Han, J. S.; Hur, S. O. [KAERI, Daejeon (Korea, Republic of)

    2010-12-15

    The Fuel Test Loop(FTL) was installed for the national goal of self-supporting technology in the field of design and construction of nuclear power plant. The FTL with the fuel irradiation equipment is essential in developing, improving and inspecting the fuel of CANDU type or PWR type nuclear power plant. The FTL should be operated at the same conditions of commercial nuclear power plant such as temperature, pressure, flow rate, neutron flux and so on. Starting designing in December 2001, the FTL was installed from March 2007 to August 2008. Especially the In Pile Section(IPS) was installed at IR1 hole in August 2008. Until September 2009 after loading the test fuel, a series of power escalation tests (LSD, CSB1, CSB2, HSB, HOP) were conducted. And it was operated at the condition of CSB2 for the 8 cycles from October 2009 to July 2010. But it could not be normally operated in early 2010, because the high radiation released from irradiated materials due to the worn down bearing of main cooling pump. So, we removed the IPS and installed a newly designed IPS bypass line to prevent increasing high radiation. In this report we will present preliminary works, main works processes, devices of making work environments, a designing and manufacturing of IPS bypass line and a rack of IPS, installing know-hows, problems and solutions broke out during the work etc. We believe that our efforts to complete successful installing and operating of the FTL system will contribute for the efficient utilization of HANARO

  9. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  10. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  11. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  12. X-rays of inner worlds: the mid-twentieth-century American projective test movement.

    Science.gov (United States)

    Lemov, Rebecca

    2011-01-01

    This essay begins to tell the neglected history of the projective test movement in the U.S. behavioral sciences from approximately 1941 to 1968. This cross-disciplinary enterprise attempted to use projective techniques as "X-ray" machines to see into the psyches of subjects tested around the world. The aim was to gather subjective materials en masse, pursuing data on a scope, scale, and manner rarely hazarded before in any science. In particular, the targeted data included the traces of the inner life and elusive aspects of subjective experience including dreams, life stories, and myriad test results from a battery of tests. This essay explores how the movement and the experimental data bank that resulted were unlikely yet telling sites for the practice and pursuit of the Cold War human sciences. To look closely at the encounters that resulted is to show how the most out-of-the-way places and seemingly insignificant moments played a role in heady scientific ambitions and global geopolitical projects. At times, the projective test movement became a mirror of Cold War rationality itself, as tests were employed at the very limits of their possible extension. The essay argues for an off-kilter centrality in the movement itself, shedding light on the would-be unified social sciences after World War II and the "subjective turn" they took. © 2011 Wiley Periodicals, Inc.

  13. An Advanced Actuator Line Method for Wind Energy Applications and Beyond: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Churchfield, Matthew; Schreck, Scott; Martinez-Tossas, Luis A.; Meneveau, Charles; Spalart, Philippe R.

    2017-03-24

    The actuator line method to represent rotor aerodynamics within computational fluid dynamics has been in use for over a decade. This method applies a body force to the flow field along rotating lines corresponding to the individual rotor blades and employs tabular airfoil data to compute the force distribution. The actuator line method is attractive because compared to blade-resolved simulations, the required mesh is much simpler and the computational cost is lower. This work proposes a higher fidelity variant of the actuator line method meant to fill the space between current actuator line and blade-resolved simulations. It contains modifications in two key areas. The first is that of freestream velocity vector estimation along the line, which is necessary to compute the lift and drag along the line using tabular airfoil data. Most current methods rely on point sampling in which the location of sampling is ambiguous. Here we test a velocity sampling method that uses a properly weighted integral over space, removing this ambiguity. The second area of improvement is the function used to project the one-dimensional actuator line force onto the three-dimensional fluid mesh as a body force. We propose and test a projection function that spreads the force over a region that looks something like a real blade with the hope that it will produce the blade local and near wake flow features with more accuracy and higher fidelity. Our goal is that between these two improvements, not only will the flow field predictions be enhanced, but also the spanwise loading will be made more accurate. We refer to this combination of improvements as the advanced actuator line method. We apply these improvements to two different wind turbine cases. Although there is a strong wind energy motivation in our work, there is no reason these advanced actuator line ideas cannot be used in other applications, such as helicopter rotors.

  14. Virtual Mockup test based on computational science and engineering. Near future technology projected by JSPS-RFTFADVENTURE project

    International Nuclear Information System (INIS)

    Yoshimura, Shinobu

    2001-01-01

    The ADVENTURE project began on August, 1997, as a project in the computational science' field of JSPS-RFTFADVENTURE project, and is progressed as five year project. In this project, by using versatile parallel computer environment such as PC cluster, super parallel computer, and so on , to solve an arbitrary shape of actual dynamical equation by using 10 to 100 million freedom class mode under maintaining a general use analytical capacity agreeable with present general use computational mechanics system, further development of a large-scale parallel computational mechanics system (ADVENTURE system) capable of carrying out an optimization design on shapes, physical properties, loading conditions, and so on is performed. Here was scoped, after outlining on background of R and D on ADVENTURE system and its features, on near future virtual mockup test forecast from it. (G.K.)

  15. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  16. Evaluation of MGIT 960 System for the Second-Line Drugs Susceptibility Testing of Mycobacterium tuberculosis

    Directory of Open Access Journals (Sweden)

    Hyejin Kim

    2013-01-01

    Full Text Available Many laboratories validate DST of the second-line drugs by BACTEC MGIT 960 system. The objective of this study is to evaluate the critical concentration and perform DST for the 2nd line drugs. We evaluated 193 clinical strains of M. tuberculosis isolated from patients in South Korea. Testing the critical concentration of six second-line drugs was performed by MGIT 960 and compared with L-J proportion method. The critical concentration was determined to establish the most one that gave the difference between drug resistance and susceptibility in MGIT960 system. Good agreement of the following concentrations was found: Concordance was 95% for 0.5 μg/mL of moxifloxacin; 93.6%, 1.0 μg/mL of levofloxacin; 97.5%, 2.5 μg/mL of kanamycin; 90.6%, 2.5 μg/mL of capreomycin; 86.2%, 5.0 μg/mL of ethionamide; and 90.8%, 2.0 μg/mL of ρ-aminosalicylic acid. The critical concentrations of the four drugs, moxifloxacin, levofloxacin, kanamycin, and capreomycin, were concordant and reliable for testing 2nd line drug resistance. Further study of ethionamide and ρ-aminosalicylic acid is required.

  17. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW`s Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  18. A reconstruction algorithm for coherent scatter computed tomography based on filtered back-projection

    International Nuclear Information System (INIS)

    Stevendaal, U. van; Schlomka, J.-P.; Harding, A.; Grass, M.

    2003-01-01

    Coherent scatter computed tomography (CSCT) is a reconstructive x-ray imaging technique that yields the spatially resolved coherent-scatter form factor of the investigated object. Reconstruction from coherently scattered x-rays is commonly done using algebraic reconstruction techniques (ART). In this paper, we propose an alternative approach based on filtered back-projection. For the first time, a three-dimensional (3D) filtered back-projection technique using curved 3D back-projection lines is applied to two-dimensional coherent scatter projection data. The proposed algorithm is tested with simulated projection data as well as with projection data acquired with a demonstrator setup similar to a multi-line CT scanner geometry. While yielding comparable image quality as ART reconstruction, the modified 3D filtered back-projection algorithm is about two orders of magnitude faster. In contrast to iterative reconstruction schemes, it has the advantage that subfield-of-view reconstruction becomes feasible. This allows a selective reconstruction of the coherent-scatter form factor for a region of interest. The proposed modified 3D filtered back-projection algorithm is a powerful reconstruction technique to be implemented in a CSCT scanning system. This method gives coherent scatter CT the potential of becoming a competitive modality for medical imaging or nondestructive testing

  19. Apollo-Soyuz test project: Composite of MSFC final science report

    Science.gov (United States)

    1977-01-01

    Experimental procedures of nine experiments conducted during the Apollo-Soyuz Test Project mission from July 15th to July 24th, 1975 are presented. Conclusions and recommendations based on these experiments are given.

  20. State of Art Report for the OECD-NEA Loss-of-Forced Cooling (LOFC) Test Project using HTTR Reactor

    International Nuclear Information System (INIS)

    Jun, Ji Su

    2011-05-01

    The OECD/NEA Project is planned to perform the LOFC (Loss Of Forced Cooling) test using the HTTR (High Temperature engineering Test Reactor) in Japan from 31 March 2011 to 31 March 2013 in order to obtain the data for the code validation of the VHTR safety analysis. Based on the Project Agreement Document, this report gives a description of the HTTR-LOFC test, HTTR test facility, project schedule and deliverable items as the technical state art of the project, and appends the full translation of the project agreement articles on the project management

  1. A framework for testing the ability of models to project climate change and its impacts

    DEFF Research Database (Denmark)

    Refsgaard, J. C.; Madsen, H.; Andréassian, V.

    2014-01-01

    Models used for climate change impact projections are typically not tested for simulation beyond current climate conditions. Since we have no data truly reflecting future conditions, a key challenge in this respect is to rigorously test models using proxies of future conditions. This paper presents...... a validation framework and guiding principles applicable across earth science disciplines for testing the capability of models to project future climate change and its impacts. Model test schemes comprising split-sample tests, differential split-sample tests and proxy site tests are discussed in relation...... to their application for projections by use of single models, ensemble modelling and space-time-substitution and in relation to use of different data from historical time series, paleo data and controlled experiments. We recommend that differential-split sample tests should be performed with best available proxy data...

  2. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  3. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  4. 32 CFR 644.7 - Acquisition lines.

    Science.gov (United States)

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As..., in accordance with sound real estate practices. Accordingly, fringe tracts will not be acquired until...

  5. Psychometry and Pescatori projective test in coloproctological patients

    OpenAIRE

    dos Santos, Ana Célia Caetano Catarino; Oliveira, Dinis; Gomes, Zaida; Mesquita, Edgar; Gonçalves, Carla Rolanda Rocha

    2017-01-01

    Background Psychological assessment is not commonly performed nor easily accepted by coloproctological patients. Our aim was to evaluate the psychological component of coloproctological disorders using uncommon tools. Methods The 21-Item Depression Anxiety and Stress Scale and the Pescatori projective test were applied to coloproctological outpatients of the Gastroenterology Department of our hospital as well as to healthy volunteers. Results Seventy patients (median age 47 years, 2...

  6. Robust on-line monitoring of biogas processes; Robusta maettekniker on-line foer optimerad biogasproduktion

    Energy Technology Data Exchange (ETDEWEB)

    Nordberg, Aake; Hansson, Mikael; Kanerot, Mija; Krozer, Anatol; Loefving, Bjoern; Sahlin, Eskil

    2010-03-15

    Although demand for biomethane in Sweden is higher than ever, many Swedish codigestion plants are presently operated below their designed capacity. Efforts must be taken to increase the loading rate and guarantee stable operation and high availability of the plants. There are currently no commercial systems for on-line monitoring, and due to the characteristics of the material, including corrosion and tearing, robust applications have to be developed. The objective of this project was to identify and study different monitoring technologies with potential for on-line monitoring of both substrate mixtures and anaerobic digester content. Based on the prerequisites and demands at Boraas Energi och Miljoe AB's (BEMAB, the municipal energy and waste utility in the city of Boraas, Sweden) biogas plant, the extent of the problems, measurement variables and possible ways of managing these issues have been identified and prioritized. The substrate mixtures in question have a high viscosity and are inhomogeneous with variation in composition, which calls for further homogenization, dilution and filtration to achieve high precision in the necessary analyses. Studies of using different mixers and mills showed that the particle size (800 mum) needed for on-line COD measurement could not be achieved. The problem of homogenization can be avoided if indirect measurement methods are used. Laboratory tests with NIR (near-infra red spectroscopy) showed that VS can be predicted (R2=0,78) in the interval of 2-9% VS. Furthermore, impedance can give a measurement of soluble components. However, impedance is not sensitive enough to give a good measurement of total TS. Microwave technology was installed at the production plant and showed a faster response to changes in TS than the existing TS-sensor. However, due to technical problems, the evaluation only could be done during a limited period of ten days. BEMAB will continue the measurements and evaluation of the instrument. The

  7. Project for a beam line consecrated to soft condensed matter, common heterogeneous materials and non-crystalline materials on soleil

    International Nuclear Information System (INIS)

    Ne, F.; Zemb, T.

    1998-01-01

    This project is a part of the 'SOLEIL' synchrotron project. The camera proposed is optimized for small angle x-ray scattering in the domain of soft condensed matter, common heterogeneous materials such as wood, cements, glass, and more generally non-crystalline materials. The beam line is designed to allow a quick succession of different users without time consuming adjustments. Therefore, optical settings are minimized, taking into account the pluri-disciplinary nature of the analysis possibilities. To this end, the technical requirements are as follows. First and essentially, the wave-length has to be fixed and set around 12 keV. Focusing mirrors, optics to sample and sample to detector distances, and the size of the detector allow for a wide range of wave vector to be used. Rejection rate will be lower, and angular dynamical range will be larger than any of the current synchrotron lines. We want this line to be, and to stay, complementary to more specific systems, such as reflectivity experiments or grazing angle scattering experiments. However, we are thinking of an adaptation to ultra small angle scattering mode, based on the Bonse and Hart camera. Such equipment, actually a kind of 'Instamatic' of the reciprocal space, will fulfill to the need of chemical engineers, biophysicists or material scientists interested in hard as well as soft condensed matter. It will allow a large amount of experiments per time unit. (author)

  8. Off-line tests of superconducting resonators of the JAERI tandem booster

    International Nuclear Information System (INIS)

    Shibata, Michihiro; Ishii, Tetsuro; Takeuchi, Suehiro

    1993-01-01

    The JAERI tandem booster linac, which consists of 46 superconducting quarter wave resonators, is under construction. Off-line tests for resonators were performed. Accelerating field levels of 7MV/m were obtained at an rf input of 4W with most resonators. A maximum field level of 12.7MV/m was obtained. The Q-value was degraded when resonators were cooled down slowly around a temperature of 120K. We investigated this phenomenon by changing the cooling rate. (author)

  9. Second line drug susceptibility testing to inform the treatment of rifampin-resistant tuberculosis: a quantitative perspective

    Directory of Open Access Journals (Sweden)

    Emily A. Kendall

    2017-03-01

    Full Text Available Treatment failure and resistance amplification are common among patients with rifampin-resistant tuberculosis (TB. Drug susceptibility testing (DST for second-line drugs is recommended for these patients, but logistical difficulties have impeded widespread implementation of second-line DST in many settings. To provide a quantitative perspective on the decision to scale up second-line DST, we synthesize literature on the prevalence of second-line drug resistance, the expected clinical and epidemiologic benefits of using second-line DST to ensure that patients with rifampin-resistant TB receive effective regimens, and the costs of implementing (or not implementing second-line DST for all individuals diagnosed with rifampin-resistant TB. We conclude that, in most settings, second-line DST could substantially improve treatment outcomes for patients with rifampin-resistant TB, reduce transmission of drug-resistant TB, prevent amplification of drug resistance, and be affordable or even cost-saving. Given the large investment made in each patient treated for rifampin-resistant TB, these payoffs would come at relatively small incremental cost. These anticipated benefits likely justify addressing the real challenges faced in implementing second-line DST in most high-burden settings.

  10. Level of Aspiration, Risk-Taking Behavior, and Projective Test Performance: A Search for Coherence

    Science.gov (United States)

    Lefcourt, Herbert M.; Steffy, Richard A.

    1970-01-01

    Correlations were obtained between level of aspiration, gambling, and projective test variables. Achievement oriented behaviors in the level of aspiration task and in the gambling task were related to each other, and both were related to the adequacy of response to sexual stimuli in projective testing. Reprints from Herbert M. Lefcourt, Department…

  11. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  12. A test plan for an on-line whole building energy calculator

    Energy Technology Data Exchange (ETDEWEB)

    Purdy, J.; Ferguson, A.; Mombourquette, S.; Haddad, K.; Lopez, P.; Wyndham-Wheeler, P.; Henry, S. [CANMET Energy Technology Centre, Natural Resources, Ottawa, Ont. (Canada)

    2008-04-15

    This paper presents the testing of a dynamic on-line whole-building energy calculator. The tool consists of a web-based interface for user inputs; an application to create the simulation input files from these user inputs; a simulation engine; and an application for passing the simulation engine output back to the interface and user. A detailed test protocol, composed of three parts, was developed as part of the software development process for quality assurance purposes. This paper will present the tasks specific to the development of the simulation engine, including, the definition of the required user inputs, the creation of default house archetypes, and the definition of the results to be presented to the user. It will also investigate the three parts of the test plan as well as the task automation tools developed to facilitate the testing. The use of these tools proved very useful given the large number of combinations of user inputs at the web interface and input files to the simulation engine. The findings show the importance of having a detailed and comprehensive test protocol during the software development phase. (author)

  13. On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN

    CERN Document Server

    Rausch, R

    1999-01-01

    The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At such dose levels, no major radiation-damage problems are to be expected, and the possibility of installing Commercial Of The Shelf (COTS) electronic equipment in the LHC tunnel along the accelerator is considered. To this purpose, industrial electronic equipment and circuits have to be qualified and tested against radiation to insure their long term stability and reliability. An on-line radiation test facility has been setup at the CERN Super Proton Synchrotron (SPS) and a program of on-line tests for electronic equipment is ongoing. Equipment tested includes Industrial Programmable Logic Controllers (PLCs) from several manufacturers, standard VME modules, Fieldbuses like Profibus, WorldFIP and CAN, various electro...

  14. Psychological characteristics of eating disorders as evidenced by the combined administration of questionnaires and two projective methods: the Tree Drawing Test (Baum Test) and the Sentence Completion Test.

    Science.gov (United States)

    Mizuta, Ichiro; Inoue, Yoichi; Fukunaga, Tomoko; Ishi, Ryohei; Ogawa, Asao; Takeda, Masatoshi

    2002-02-01

    The objective of this study is to examine psychological/psychopathological characteristics of eating disorders and their subtypes through a combined administration of questionnaires and projective tests. Three questionnaires (Eating Disorder Inventory - 2, Social Adaptation Scale, Southern California University Eating Disorder Inventory - Revised) and two projective tests (the Tree Drawing Test [TDT, Baum Test], and the Sentence Completion Test [SCT]) were administered to 126 female patients between the ages of 15 and 30 years, with eating disorders according to DSM-IV criteria at our outpatient clinic, and to 54 sex- and age-matched control subjects. The purging subtypes of eating disorders (anorexia nervosa - binge-eating/purging type [ANBP] and bulimia nervosa - purging type [BNP]) were clearly differentiated from the controls, both by the questionnaires and the projective tests. Compared with the controls, ANBP/BNP showed more problematic profiles across the three questionnaires, drew smaller and poorer trees in TDT to a more left location on the drawing paper, and gave fewer positive, and more negative responses in SCT. In contrast, few significant differences were found between anorexia nervosa- restricting type (ANR) and the controls, and between ANBP and BNP. As a trend, however, ANR was consistently located between the controls and ANBP/BNP across the whole questionnaires and projective tests.

  15. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  16. On-Line Use of Three-Dimensional Marker Trajectory Estimation From Cone-Beam Computed Tomography Projections for Precise Setup in Radiotherapy for Targets With Respiratory Motion

    International Nuclear Information System (INIS)

    Worm, Esben S.; Høyer, Morten; Fledelius, Walther; Nielsen, Jens E.; Larsen, Lars P.; Poulsen, Per R.

    2012-01-01

    Purpose: To develop and evaluate accurate and objective on-line patient setup based on a novel semiautomatic technique in which three-dimensional marker trajectories were estimated from two-dimensional cone-beam computed tomography (CBCT) projections. Methods and Materials: Seven treatment courses of stereotactic body radiotherapy for liver tumors were delivered in 21 fractions in total to 6 patients by a linear accelerator. Each patient had two to three gold markers implanted close to the tumors. Before treatment, a CBCT scan with approximately 675 two-dimensional projections was acquired during a full gantry rotation. The marker positions were segmented in each projection. From this, the three-dimensional marker trajectories were estimated using a probability based method. The required couch shifts for patient setup were calculated from the mean marker positions along the trajectories. A motion phantom moving with known tumor trajectories was used to examine the accuracy of the method. Trajectory-based setup was retrospectively used off-line for the first five treatment courses (15 fractions) and on-line for the last two treatment courses (6 fractions). Automatic marker segmentation was compared with manual segmentation. The trajectory-based setup was compared with setup based on conventional CBCT guidance on the markers (first 15 fractions). Results: Phantom measurements showed that trajectory-based estimation of the mean marker position was accurate within 0.3 mm. The on-line trajectory-based patient setup was performed within approximately 5 minutes. The automatic marker segmentation agreed with manual segmentation within 0.36 ± 0.50 pixels (mean ± SD; pixel size, 0.26 mm in isocenter). The accuracy of conventional volumetric CBCT guidance was compromised by motion smearing (≤21 mm) that induced an absolute three-dimensional setup error of 1.6 ± 0.9 mm (maximum, 3.2) relative to trajectory-based setup. Conclusions: The first on-line clinical use of

  17. Project Protect” intervention. Testing a new approach for HIV prevention

    Directory of Open Access Journals (Sweden)

    Vasylyeva, Tetyana

    2012-07-01

    Full Text Available BACKGROUND. “Project Protect” aims to find highly infectious individuals through screening for acute/recent infection cases and prevent HIV transmission in the risk networks of these cases through contact tracing of these networks` participants, distributing community alerts about risk of acute infection among them and accurate post-test counseling.METHODS. An ongoing pilot phase of the intervention began in Kriviy Rig and Lviv, Ukraine in November, 2011. Participants are recruited through: 1 screening for cases of acute/recent infection at voluntary counseling and testing (VCT sites and in partner organizations (including AIDS-Centers which conduct VCT; 2 visits to drug use venues, chain-referral and contact tracing. Genscreen ultra HIV Ag-Ab “special-tests” are used to detect cases of acute infection. Recent infection is defined as positive test result and preceding negative result within 6 months and/or age younger than 21 years old.RESULTS. In the two cities 173 respondents were recruited to the project, 118 special tests were done. No cases of acute infection and eleven cases of recent infection were found (8 injection drug users (IDUs with preceding negative result within 6 months, 2 IDUs younger than 21 recruited by project team; one non-IDU with preceding negative result within 6 months referred from AIDS-Center. Six recent cases were recruited through screening at VCT sites, 5 others through contact tracing. Psychologists conducted 41 interviews with recent infection cases and their risk networks` members; 176 community alert flyers were distributed to members of risk networks during the interview by psychologist, at the venue by social worker and by participants themselves; 3 drug use venues were visited by project team with concomitant HIV-testing of people present at the venue. CONCLUSIONS. Network tracing seems to be feasible and to help find recently infected people. Further research is needed to tell whether this

  18. Medical microbiological analysis of Apollo-Soyuz test project crewmembers

    Science.gov (United States)

    Taylor, G. R.; Zaloguev, S. N.

    1976-01-01

    The procedures and results of the Microbial Exchange Experiment (AR-002) of the Apollo-Soyuz Test Project are described. Included in the discussion of procedural aspects are methods and materials, in-flight microbial specimen collection, and preliminary analysis of microbial specimens. Medically important microorganisms recovered from both Apollo and Soyuz crewmen are evaluated.

  19. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  20. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  1. Ecodriver. D23.1: Report on test scenarios for val-idation of on-line vehicle algorithms

    NARCIS (Netherlands)

    Seewald, P.; Ivens, T.W.T.; Spronkmans, S.

    2014-01-01

    This deliverable provides a description of test scenarios that will be used for validation of WP22’s on-line vehicle algorithms. These algorithms consist of the two modules VE³ (Vehicle Energy and Environment Estimator) and RSG (Reference Signal Genera-tor) and will be tested using the

  2. Clinical identification of compensatory structures on projective tests: a self psychological approach.

    Science.gov (United States)

    Silverstein, M L

    2001-06-01

    In this article I discuss compensatory structure, a concept from Kohut's (1971, 1977) psychology of the self that is not as familiar as Kohut's other views about the self. Compensatory structures are attempts to repair selfobject failure, usually by strengthening idealization or twinship in the face of mirroring deficits. Compensatory structures, particularly their early indications, can be detected on projective tests for identifying adaptive resources and treatment potential. The clinical identification of compensatory structures on test findings is described using Rorschach and Thematic Apperception Test (Murray, 1943) content. Particular attention is devoted to the 2-part process of demonstrating first, an injury to the self, and second, how attempts to recover from such injuries can be detected on projective tests. Clinical examples are provided, and the differentiation between compensatory structures and defenses and sublimation is discussed.

  3. Beyond "objective" and "projective": a logical system for classifying psychological tests: comment on Meyer and Kurtz (2006).

    Science.gov (United States)

    Wagner, Edwin E

    2008-07-01

    I present a formal system that accounts for the misleading distinction between tests formerly termed objective and projective, duly noted by Meyer and Kurtz (2006). Three principles of Response Rightness, Response Latitude and Stimulus Ambiguity are shown to govern, in combination, the formal operating characteristics of tests, producing inevitable overlap between "objective" and "projective" tests and creating at least three "types" of tests historically regarded as being projective in nature. The system resolves many past issues regarding test classification and can be generalized to include all psychological tests.

  4. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: RAPID C iv BROAD ABSORPTION LINE VARIABILITY

    International Nuclear Information System (INIS)

    Grier, C. J.; Brandt, W. N.; Trump, J. R.; Schneider, D. P.; Hall, P. B.; Shen, Yue; Vivek, M.; Dawson, K. S.; Ak, N. Filiz; Chen, Yuguang; Denney, K. D.; Kochanek, C. S.; Peterson, B. M.; Green, Paul J.; Jiang, Linhua; McGreer, Ian D.; Pâris, I.; Tao, Charling; Wood-Vasey, W. M.; Bizyaev, Dmitry

    2015-01-01

    We report the discovery of rapid variations of a high-velocity C iv broad absorption line trough in the quasar SDSS J141007.74+541203.3. This object was intensively observed in 2014 as a part of the Sloan Digital Sky Survey Reverberation Mapping Project, during which 32 epochs of spectroscopy were obtained with the Baryon Oscillation Spectroscopic Survey spectrograph. We observe significant (>4σ) variability in the equivalent width (EW) of the broad (∼4000 km s −1 wide) C iv trough on rest-frame timescales as short as 1.20 days (∼29 hr), the shortest broad absorption line variability timescale yet reported. The EW varied by ∼10% on these short timescales, and by about a factor of two over the duration of the campaign. We evaluate several potential causes of the variability, concluding that the most likely cause is a rapid response to changes in the incident ionizing continuum. If the outflow is at a radius where the recombination rate is higher than the ionization rate, the timescale of variability places a lower limit on the density of the absorbing gas of n e ≳ 3.9 × 10 5 cm −3 . The broad absorption line variability characteristics of this quasar are consistent with those observed in previous studies of quasars, indicating that such short-term variability may in fact be common and thus can be used to learn about outflow characteristics and contributions to quasar/host-galaxy feedback scenarios

  5. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  6. Overview and Example Test Results of Modern Pilot Schemes for Coordination of Line Distance Protection Relays

    OpenAIRE

    Emil Bartosiewicz; Ryszard Kowalik; Marcin Januszewski

    2014-01-01

    The paper presents a short review of pilot schemes which are available in modern line distance protection relays, and example results of common pilot scheme tests with the testing methods description. Some differences in implementations of selected pilot schemes have been shown for comparison reasons. Distance protection coordination functions have been tested for GE Multilin UR series devices. Every type of available pilot scheme has been checked in synthetic tests and during the real ...

  7. 'Fluorescent Cell Chip' for immunotoxicity testing: Development of the c-fos expression reporter cell lines

    International Nuclear Information System (INIS)

    Trzaska, Dominika; Zembek, Patrycja; Olszewski, Maciej; Adamczewska, Violetta; Ulleras, Erik; Dastych, JarosIaw

    2005-01-01

    The Fluorescent Cell Chip for in vitro immunotoxicity testing employs cell lines derived from lymphocytes, mast cells, and monocytes-macrophages transfected with various EGFP cytokine reporter gene constructs. While cytokine expression is a valid endpoint for in vitro immunotoxicity screening, additional marker for the immediate-early response gene expression level could be of interest for further development and refinement of the Fluorescent Cell Chip. We have used BW.5147.3 murine thymoma transfected with c-fos reporter constructs to obtain reporter cell lines expressing ECFP under the control of murine c-fos promoter. These cells upon serum withdrawal and readdition and incubation with heavy metal compounds showed paralleled induction of c-Fos expression as evidenced by Real-Time PCR and ECFP fluorescence as evidenced by computer-supported fluorescence microscopy. In conclusion, we developed fluorescent reporter cell lines that could be employed in a simple and time-efficient screening assay for possible action of chemicals on c-Fos expression in lymphocytes. The evaluation of usefulness of these cells for the Fluorescent Cell Chip-based detection of immunotoxicity will require additional testing with a larger number of chemicals

  8. Toxicology Study No. S.0024589d 15, Human Cell Line Activation Test of the Novel Energetic, 3,4 -Dinitropyrazole (DNP)

    Science.gov (United States)

    2016-04-01

    Assay 1 0.259 0.278 Assay 2 0.299 6.3 CD54 and CD86 expression in response to DNP exposure of THP -1 cells Three independent tests were...2 Toxicology Study No. S.0024589d-15, April 2016 Toxicology Directorate Human Cell Line Activation Test of the Novel Energetic 3,4...report. 17-05-2016 Technical Report March 2016-April 2016 Toxicology Study No. S.0024589d-15 Human Cell Line Activation Test of the Novel

  9. A Cryogenic Test Set-Up for the Qualification of Pre-Series Test Cells for the LHC Cryogenic Distribution Line

    CERN Document Server

    Livran, J; Parente, C; Riddone, G; Rybkowski, D; Veillet, N

    2000-01-01

    Three pre-series Test Cells of the LHC Cryogenic Distribution Line (QRL) [1], manufactured by three European industrial companies, will be tested in the year 2000 to qualify the design chosen and verify the thermal and mechanical performances. A dedicated test stand (170 m x 13 m) has been built for extensive testing and performance assessment of the pre-series units in parallel. They will be fed with saturated liquid helium at 4.2 K supplied by a mobile helium dewar. In addition, LN2 cooled helium will be used for cool-down and thermal shielding. For each of the three pre-series units, a set of end boxes has been designed and manufactured at CERN. This paper presents the layout of the cryogenic system for the pre-series units, the calorimetric methods as well as the results of the thermal calculation of the end box test.

  10. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  11. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  12. The Genomes OnLine Database (GOLD) v.5: a metadata management system based on a four level (meta)genome project classification

    Science.gov (United States)

    Reddy, T.B.K.; Thomas, Alex D.; Stamatis, Dimitri; Bertsch, Jon; Isbandi, Michelle; Jansson, Jakob; Mallajosyula, Jyothi; Pagani, Ioanna; Lobos, Elizabeth A.; Kyrpides, Nikos C.

    2015-01-01

    The Genomes OnLine Database (GOLD; http://www.genomesonline.org) is a comprehensive online resource to catalog and monitor genetic studies worldwide. GOLD provides up-to-date status on complete and ongoing sequencing projects along with a broad array of curated metadata. Here we report version 5 (v.5) of the database. The newly designed database schema and web user interface supports several new features including the implementation of a four level (meta)genome project classification system and a simplified intuitive web interface to access reports and launch search tools. The database currently hosts information for about 19 200 studies, 56 000 Biosamples, 56 000 sequencing projects and 39 400 analysis projects. More than just a catalog of worldwide genome projects, GOLD is a manually curated, quality-controlled metadata warehouse. The problems encountered in integrating disparate and varying quality data into GOLD are briefly highlighted. GOLD fully supports and follows the Genomic Standards Consortium (GSC) Minimum Information standards. PMID:25348402

  13. The Genomes OnLine Database (GOLD) v.5: a metadata management system based on a four level (meta)genome project classification

    Energy Technology Data Exchange (ETDEWEB)

    Reddy, Tatiparthi B. K. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Thomas, Alex D. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Stamatis, Dimitri [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Bertsch, Jon [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Isbandi, Michelle [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Jansson, Jakob [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Mallajosyula, Jyothi [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Pagani, Ioanna [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Lobos, Elizabeth A. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Kyrpides, Nikos C. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); King Abdulaziz Univ., Jeddah (Saudi Arabia)

    2014-10-27

    The Genomes OnLine Database (GOLD; http://www.genomesonline.org) is a comprehensive online resource to catalog and monitor genetic studies worldwide. GOLD provides up-to-date status on complete and ongoing sequencing projects along with a broad array of curated metadata. Within this paper, we report version 5 (v.5) of the database. The newly designed database schema and web user interface supports several new features including the implementation of a four level (meta)genome project classification system and a simplified intuitive web interface to access reports and launch search tools. The database currently hosts information for about 19 200 studies, 56 000 Biosamples, 56 000 sequencing projects and 39 400 analysis projects. More than just a catalog of worldwide genome projects, GOLD is a manually curated, quality-controlled metadata warehouse. The problems encountered in integrating disparate and varying quality data into GOLD are briefly highlighted. Lastly, GOLD fully supports and follows the Genomic Standards Consortium (GSC) Minimum Information standards.

  14. BWR 200 % recirculation pump suction line break LOCA tests, RUNs 942 and 943 at ROSA-III without HPCS

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Tasaka, Kanji; Anoda, Yoshinari; Kumamaru, Hiroshige; Nakamura, Hideo; Yonomoto, Taisuke; Murata, Hideo; Koizumi, Yasuo

    1986-03-01

    This report presents the experimental results of RUNs 942 and 943 in ROSA-III program, which are 200 % recirculation pump suction line break LOCA tests with assumption of HPCS failure. The ROSA-III test facility simulates a BWR system with volume scale of 1/424 and has four half-length electrically heated fuel bundles, two active recirculation loops, ECCS's, and steam and feedwater systems. Effects of initial core void distribution and other fluid conditions on overall LOCA phenomena with special interest on transient core cooling phenomena were investigated by comparing the present test results with those of RUN 926, a 200 % suction line break test with standard initial fluid conditions. The initial core outlet quality was changed between 5 % and 43 %. As conclusions, (1) the initial lower core flow and higher void fraction affected significantly the core cooling conditions and resulted in earlier and higher PCT. (2) The lower plenum flashing temporarily contributed to cool down the core. (3) Flashing of remained hot water in the feedwater line affected slightly the pressure response and delayed the actuation of LPCI by 11 seconds. (4) The whole core was completely cooled down within 104 seconds after the LPCI actuation in these large break tests. (author)

  15. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    Science.gov (United States)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  16. High power test of RF window and coaxial line in vacuum

    International Nuclear Information System (INIS)

    Sun, D.; Champion, M.; Gormley, M.; Kerns, Q.; Koepke, K.; Moretti, A.

    1993-01-01

    Primary rf input couplers for the superconducting accelerating cavities of the TESLA electron linear accelerator test to be performed at DESY, Hamburg, Germany are under development at both DESY and Fermilab. The input couplers consist of a WR650 waveguide to coaxial line transition with an integral ceramic window, a coaxial connection to the superconducting accelerating cavity with a second ceramic window located at the liquid nitrogen heat intercept location, and bellows on both sides of the cold window to allow for cavity motion during cooldown, coupling adjustments and easier assembly. To permit in situ high peak power processing of the TESLA superconducting accelerating cavities, the input couplers are designed to transmit nominally 1 ms long, 2 MW peak, 1.3 GHz rf pulses from the WR650 waveguide at room temperature to the cavities at 1.8 K. The coaxial part of the Fermilab TESLA input coupler design has been tested up to 1.7 MW using the prototype 805 MHz rf source located at the A0 service building of the Tevatron. The rf source, the testing system and the test results are described

  17. Summary of the Atmospheric Test Data (Film Scanning and Re-Analysis) Project at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Murray, S. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-03-21

    The goal of the Atmospheric Test Data (ATD) Project is to preserve and make better use of scientific-quality films that were taken during the era of above ground nuclear testing. The project is being done in collaboration with Los Alamos National Laboratory, which is the custodian of the films. Our primary points of contact at LANL have been Alan Carr, Carla Breiner, and Randy Drake.

  18. High-speed railway lines. Fatigue of contact wires

    Energy Technology Data Exchange (ETDEWEB)

    Avronsart, Stephane; Kalsbeek, Guido van [SNCF, La Plaine St. Denis (France); Mai, Si Hai; Massat, Jean Pierre; Nguyen-Tajan, Thi Mac-Lan [SNCF, Paris (France)

    2013-06-15

    With more than 30 years of operation of High-Speed Lines, SNCF has a large feedback on behaviour of components. Regarding the contact wire, the only operation of maintenance consists in measuring the thickness in order to estimate the remaining lifetime which in total is around 50 years. With such a long period of operation the question was raised on fatigue phenomena. The research project launched by SNCF on this topic in 2011 includes tests on copper material characteristics, modelling of the crack initiation and propagation and detection of cracks on the contact wire. The result of this research project could lead to request for changes in EN 50149 by introducing new material characteristic parameters for contact wire related to fatigue. (orig.)

  19. In vitro screening of environmental chemicals for targeted testing prioritization: the ToxCast project.

    Science.gov (United States)

    Judson, Richard S; Houck, Keith A; Kavlock, Robert J; Knudsen, Thomas B; Martin, Matthew T; Mortensen, Holly M; Reif, David M; Rotroff, Daniel M; Shah, Imran; Richard, Ann M; Dix, David J

    2010-04-01

    Chemical toxicity testing is being transformed by advances in biology and computer modeling, concerns over animal use, and the thousands of environmental chemicals lacking toxicity data. The U.S. Environmental Protection Agency's ToxCast program aims to address these concerns by screening and prioritizing chemicals for potential human toxicity using in vitro assays and in silico approaches. This project aims to evaluate the use of in vitro assays for understanding the types of molecular and pathway perturbations caused by environmental chemicals and to build initial prioritization models of in vivo toxicity. We tested 309 mostly pesticide active chemicals in 467 assays across nine technologies, including high-throughput cell-free assays and cell-based assays, in multiple human primary cells and cell lines plus rat primary hepatocytes. Both individual and composite scores for effects on genes and pathways were analyzed. Chemicals displayed a broad spectrum of activity at the molecular and pathway levels. We saw many expected interactions, including endocrine and xenobiotic metabolism enzyme activity. Chemicals ranged in promiscuity across pathways, from no activity to affecting dozens of pathways. We found a statistically significant inverse association between the number of pathways perturbed by a chemical at low in vitro concentrations and the lowest in vivo dose at which a chemical causes toxicity. We also found associations between a small set of in vitro assays and rodent liver lesion formation. This approach promises to provide meaningful data on the thousands of untested environmental chemicals and to guide targeted testing of environmental contaminants.

  20. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  1. Repository-relevant testing applied to the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.; Veleckis, E.

    1989-04-01

    A repository environment poses a challenge to developing a testing program because of the diverse nature of conditions that may exist at a given time during the life of the repository. A starting point is to identify whether any potential waste-water contact modes are particularly deleterious to the waste form performance, and whether any interactions between materials present in the waste package environment need to be accounted for during modeling the waste form reaction. The Unsaturated Test method in one approach that has been developed by the Yucca Mountain Project (YMP) to investigate the above issues, and a description of results that have been obtained during the testing of glass and unirradiated UO 2 are the subject of this report. 10 refs., 7 figs., 4 tabs

  2. Design of a testing strategy using non-animal based test methods: lessons learnt from the ACuteTox project.

    Science.gov (United States)

    Kopp-Schneider, Annette; Prieto, Pilar; Kinsner-Ovaskainen, Agnieszka; Stanzel, Sven

    2013-06-01

    In the framework of toxicology, a testing strategy can be viewed as a series of steps which are taken to come to a final prediction about a characteristic of a compound under study. The testing strategy is performed as a single-step procedure, usually called a test battery, using simultaneously all information collected on different endpoints, or as tiered approach in which a decision tree is followed. Design of a testing strategy involves statistical considerations, such as the development of a statistical prediction model. During the EU FP6 ACuteTox project, several prediction models were proposed on the basis of statistical classification algorithms which we illustrate here. The final choice of testing strategies was not based on statistical considerations alone. However, without thorough statistical evaluations a testing strategy cannot be identified. We present here a number of observations made from the statistical viewpoint which relate to the development of testing strategies. The points we make were derived from problems we had to deal with during the evaluation of this large research project. A central issue during the development of a prediction model is the danger of overfitting. Procedures are presented to deal with this challenge. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Design and initial tests of beam current monitoring systems for the APS transport lines

    International Nuclear Information System (INIS)

    Wang, Xucheng.

    1992-01-01

    The non-intercepting beam current monitoring systems suitable for a wide, range of beam parameters have been developed for the Advanced Photon Source (APS) low energy transport lines and high energy transport line. The positron or electron beam pulse in the transport lines wig have peak beam currents ranging from 8 mA to 29 A with pulse widths varying from 120 ps to 30 ns and pulse repetition rates from 2 Hz to 60 Hz. The peak beam current or total beam charge is measured with the fast or integrating current transformer, respectively, manufactured by Bergoz. In-house high speed beam signal processing electronics provide a DC level output proportional to the peak current or total charge for the digitizer input. The prototype systems were tested on the linacs which have beam pulse structures similar to that of the APS transport lines. This paper describes the design of beam signal processing electronics and grounding and shielding methods for current transformers. The results of the initial operations are presented. A short introduction on the preliminary design of current monitoring systems for the APS rings is also included

  4. Preoperational test report, primary ventilation condensate system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-01-29

    Preoperational test report for Primary Ventilation Condensate System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides a collection point for condensate generated by the W-030 primary vent offgas cooling system serving tanks AYIOI, AY102, AZIOI, AZI02. The system is located inside a shielded ventilation equipment cell and consists of a condensate seal pot, sampling features, a drain line to existing Catch Tank 241-AZ-151, and a cell sump jet pump. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  5. Digital implementation, simulation and tests in MATLAB of the models of Steam line, the turbines, the pressure regulator of a BWR type nucleo electric power plant

    International Nuclear Information System (INIS)

    Lopez R, A.

    2004-01-01

    In this phase of the project they were carried out exhaustive tests to the models of the steam lines, turbines and pressure regulator of a BWR type nucleo electric central for to verify that their tendencies and behaviors are it more real possible. For it, it was necessary to also analyze the transfer functions of the different components along the steam line until the power generator. Such models define alone the dominant poles of the system, what is not limitation to reproduce a wide range of anticipated transitoriness of a power station operation. In the same manner, it was integrated and proved the integrated model form with the models of feeding water of the SUN-RAH, simulating the nuclear reactor starting from predetermined entrances of the prospective values of the vessel. Also it was coupled with the graphic interface developed with the libraries DirectX implementing a specific monitoring panel for this system. (Author)

  6. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  7. Experimental Results of A1.1 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). Considering the importance of the SBO scenario and the related accident mitigation measures, a prolonged SBO scenario was selected as the first test subject worthy of investigation in the OECD-ATLAS project as summarized in Table 1. After the Fukushima accident, design extension conditions (DECs) such as an SBO and a total loss of feed water (TLOFW) attracted wide international attention in that such high-risk multiple failure accidents should be revisited from the viewpoint of the reinforcement of the 'defense in depth' concept. In particular, an SBO is one of the most important DECs because a total loss of heat sink can lead to a core melt-down scenario under high pressure without any proper operator action. As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In most nuclear power plants (NPPs), a turbine-driven auxiliary feedwater system was designed to remove the decay heat during the early period of an SBO transient. From a conservative point of view, however, it is necessary to investigate the thermal-hydraulic behaviors of the NPP when a turbine-driven auxiliary feedwater supply is not available during the initial period of an SBO transient and moreover a mobile pump-driven auxiliary feedwater supply can only become realized in the later period of the scenario. In particular, asymmetric heat removal characteristic through the supply of auxiliary feedwater only to one steam generator has its own peculiar importance in terms of safety analysis code validation. With an aim of considering these safety importance, in the A1.1 test, a prolonged SBO transient was simulated with two temporal phases: Phase (I) for a conservative SBO transient

  8. Ultrasonic test results for the reactor pressure vessel of the HTTR. Longitudinal welding line of bottom dome

    International Nuclear Information System (INIS)

    Nojiri, Naoki; Ohwada, Hiroyuki; Kato, Yasushi

    2008-06-01

    This paper describes the inspection method, the measured area, etc. of the ultrasonic test of the in-service inspection (ISI) for welding lines of the reactor pressure vessel of the HTTR and the inspection results of the longitudinal welding line of the bottom dome. The pre-service inspection (PSI) results for estimation of occurrence and progression of defects to compare the ISI results is described also. (author)

  9. [Attachment representation and a projective test with pictures of parent-child interaction].

    Science.gov (United States)

    Kubo, M

    2000-02-01

    The purpose of this study was to assess individual differences in attachment representation. They were assessed, not through direct verbal reports, but indirectly as indicated in a projective test. The test required subjects to tell their impressions of pictures, which depicted daily, routine parent-child interactions. A series of pictures were developed for story-making task, which was named PARS (Picture Attachment Related Study). Three hundred and two (302) undergraduate and vocational students were asked to see the pictures, and freely imagine the situation, think what they would feel, and create the further story. They were then to recall their own experiences with their parents, and fill out a questionnaire of how they see their relationship with others. It was found that those who made a trustful PARS story recalled their own attachment experiences in an autonomous way, and had lower distrust in their relationship with others. Thus, results of the projective test were shown to reflect individual personal attachment experiences, and the test be useful.

  10. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: RAPID C iv BROAD ABSORPTION LINE VARIABILITY

    Energy Technology Data Exchange (ETDEWEB)

    Grier, C. J.; Brandt, W. N.; Trump, J. R.; Schneider, D. P. [Department of Astronomy and Astrophysics and Institute for Gravitation and the Cosmos, The Pennsylvania State University, 525 Davey Laboratory, University Park, PA 16802 (United States); Hall, P. B. [Department of Physics and Astronomy, York University, Toronto, ON M3J 1P3 (Canada); Shen, Yue [Carnegie Observatories, 813 Santa Barbara Street, Pasadena, CA 91101 (United States); Vivek, M.; Dawson, K. S. [Department of Physics and Astronomy, University of Utah, Salt Lake City, UT 84112 (United States); Ak, N. Filiz [Faculty of Sciences, Department of Astronomy and Space Sciences, Erciyes University, 38039 Kayseri (Turkey); Chen, Yuguang [Department of Astronomy, School of Physics, Peking University, Beijing 100871 (China); Denney, K. D.; Kochanek, C. S.; Peterson, B. M. [Department of Astronomy, The Ohio State University, 140 West 18th Avenue, Columbus, OH 43210 (United States); Green, Paul J. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Jiang, Linhua [Kavli Institute for Astronomy and Astrophysics, Peking University, Beijing 100871 (China); McGreer, Ian D. [Steward Observatory, The University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721-0065 (United States); Pâris, I. [INAF-Osservatorio Astronomico di Trieste, Via G. B. Tiepolo 11, I-34131 Trieste (Italy); Tao, Charling [Centre de Physique des Particules de Marseille, Aix-Marseille Universite, CNRS /IN2P3, 163, avenue de Luminy, Case 902, F-13288 Marseille Cedex 09 (France); Wood-Vasey, W. M. [PITT PACC, Department of Physics and Astronomy, University of Pittsburgh, 3941 O’Hara Street, Pittsburgh, PA 15260 (United States); Bizyaev, Dmitry, E-mail: grier@psu.edu [Apache Point Observatory and New Mexico State University, P.O. Box 59, Sunspot, NM, 88349-0059 (United States); and others

    2015-06-10

    We report the discovery of rapid variations of a high-velocity C iv broad absorption line trough in the quasar SDSS J141007.74+541203.3. This object was intensively observed in 2014 as a part of the Sloan Digital Sky Survey Reverberation Mapping Project, during which 32 epochs of spectroscopy were obtained with the Baryon Oscillation Spectroscopic Survey spectrograph. We observe significant (>4σ) variability in the equivalent width (EW) of the broad (∼4000 km s{sup −1} wide) C iv trough on rest-frame timescales as short as 1.20 days (∼29 hr), the shortest broad absorption line variability timescale yet reported. The EW varied by ∼10% on these short timescales, and by about a factor of two over the duration of the campaign. We evaluate several potential causes of the variability, concluding that the most likely cause is a rapid response to changes in the incident ionizing continuum. If the outflow is at a radius where the recombination rate is higher than the ionization rate, the timescale of variability places a lower limit on the density of the absorbing gas of n{sub e} ≳ 3.9 × 10{sup 5} cm{sup −3}. The broad absorption line variability characteristics of this quasar are consistent with those observed in previous studies of quasars, indicating that such short-term variability may in fact be common and thus can be used to learn about outflow characteristics and contributions to quasar/host-galaxy feedback scenarios.

  11. Evaluation of the radionuclide tracer test conducted at the project Gnome Underground Nuclear Test Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, G.; Pohlmann, K.

    1996-08-01

    A radionuclide tracer test was conducted in 1963 by the U.S. Geological Survey at the Project Gnome underground nuclear test site, approximately 40 km southeast of Carlsbad, New Mexico. The tracer study was carried out under the auspices of the U.S. Atomic Energy Commission (AEC) to study the transport behavior of radionuclides in fractured rock aquifers. The Culebra Dolomite was chosen for the test because it was considered to be a reasonable analogue of the fractured carbonate aquifer at the Nevada Test Site (NTS), the principal location of U.S. underground nuclear tests. Project Gnome was one of a small number of underground nuclear tests conducted by the AEC at sites distant from the NTS. The Gnome device was detonated on December 10, 1961 in an evaporate unit at a depth of 360 m below ground surface. Recently, the U.S. Department of Energy (DOE) implemented an environmental restoration program to characterize, remediate, and close these offsite nuclear test areas. An early step in this process is performance of a preliminary risk analysis of the hazard posed by each site. The Desert Research Institute has performed preliminary hydrologic risk evaluations for the groundwater transport pathway at Gnome. That evaluation included the radioactive tracer test as a possible source because the test introduced radionuclides directly into the Culebra Dolomite, which is the only aquifer at the site. This report presents a preliminary evaluation of the radionuclide tracer test as a source for radionuclide migration in the Culebra Dolomite. The results of this study will assist in planning site characterization activities and refining estimates of the radionuclide source for comprehensive models of groundwater transport st the Gnome site

  12. Design and testing of a perimeter of increment threshold by projection

    OpenAIRE

    García Domene, María del Carmen; Luque Cobija, María José; Fez Saiz, Dolores de

    2017-01-01

    In the present study, we have designed and tested a perimeter for the detection of damage in the chromatic mechanisms using a video projector. To this purpose, we have characterized pixel to pixel a video projector, to account for the inhomogeneities in the projection. We have measured the tristimulus values of the projector primaries as a function of digital level, at 49 locations of the projection screen and, from them, we have arrived to a characterization model which reduces the color dif...

  13. Health impact assessment of the Atlanta BeltLine.

    Science.gov (United States)

    Ross, Catherine L; Leone de Nie, Karen; Dannenberg, Andrew L; Beck, Laurie F; Marcus, Michelle J; Barringer, Jason

    2012-03-01

    Although a health impact assessment (HIA) is a tool that can provide decision makers with recommendations to promote positive health impacts and mitigate adverse health impacts of proposed projects and policies, it is not routinely conducted on most major projects or policies. To make health a decision criterion for the Atlanta BeltLine, a multibillion-dollar transit, trails, parks, and redevelopment project. An HIA was conducted in 2005-2007 to anticipate and influence the BeltLine's effect on health determinants. Changes in access and equity, environmental quality, safety, social capital, and physical activity were forecast, and steps to maximize health benefits and reduce negative effects were recommended. Key recommendations included giving priority to the construction of trails and greenspace rather than residential and retail construction, making health an explicit goal in project priority setting, adding a public health professional to decision-making boards, increasing the connectivity between the BeltLine and civic spaces, and ensuring that affordable housing is built. BeltLine project decision makers have incorporated most of the HIA recommendations into the planning process. The HIA was cited in the awarding of additional funds of $7,000,000 for brownfield clean-up and greenspace development. The project is expected to promote the health of local residents more than in the absence of the HIA. This report is one of the first HIAs to tie specific assessment findings to specific recommendations and to identifiable impacts from those recommendations. The lessons learned from this project may help others engaged in similar efforts. Copyright © 2012. Published by Elsevier Inc.

  14. On-Line Core Thermal-Hydraulic Model Improvement

    International Nuclear Information System (INIS)

    In, Wang Kee; Chun, Tae Hyun; Oh, Dong Seok; Shin, Chang Hwan; Hwang, Dae Hyun; Seo, Kyung Won

    2007-02-01

    The objective of this project is to implement a fast-running 4-channel based code CETOP-D in an advanced reactor core protection calculator system(RCOPS). The part required for the on-line calculation of DNBR were extracted from the source of the CETOP-D code based on analysis of the CETOP-D code. The CETOP-D code was revised to maintain the input and output variables which are the same as in CPC DNBR module. Since the DNBR module performs a complex calculation, it is divided into sub-modules per major calculation step. The functional design requirements for the DNBR module is documented and the values of the database(DB) constants were decided. This project also developed a Fortran module(BEST) of the RCOPS Fortran Simulator and a computer code RCOPS-SDNBR to independently calculate DNBR. A test was also conducted to verify the functional design and DB of thermal-hydraulic model which is necessary to calculate the DNBR on-line in RCOPS. The DNBR margin is expected to increase by 2%-3% once the CETOP-D code is used to calculate the RCOPS DNBR. It should be noted that the final DNBR margin improvement could be determined in the future based on overall uncertainty analysis of the RCOPS

  15. On-Line Core Thermal-Hydraulic Model Improvement

    Energy Technology Data Exchange (ETDEWEB)

    In, Wang Kee; Chun, Tae Hyun; Oh, Dong Seok; Shin, Chang Hwan; Hwang, Dae Hyun; Seo, Kyung Won

    2007-02-15

    The objective of this project is to implement a fast-running 4-channel based code CETOP-D in an advanced reactor core protection calculator system(RCOPS). The part required for the on-line calculation of DNBR were extracted from the source of the CETOP-D code based on analysis of the CETOP-D code. The CETOP-D code was revised to maintain the input and output variables which are the same as in CPC DNBR module. Since the DNBR module performs a complex calculation, it is divided into sub-modules per major calculation step. The functional design requirements for the DNBR module is documented and the values of the database(DB) constants were decided. This project also developed a Fortran module(BEST) of the RCOPS Fortran Simulator and a computer code RCOPS-SDNBR to independently calculate DNBR. A test was also conducted to verify the functional design and DB of thermal-hydraulic model which is necessary to calculate the DNBR on-line in RCOPS. The DNBR margin is expected to increase by 2%-3% once the CETOP-D code is used to calculate the RCOPS DNBR. It should be noted that the final DNBR margin improvement could be determined in the future based on overall uncertainty analysis of the RCOPS.

  16. Rapid line scan MR angiography

    International Nuclear Information System (INIS)

    Frahm, J.; Merboldt, K.D.; Hanicke, W.; Bruhn, H.

    1987-01-01

    Direct MR angiography may be performed using line scan imaging techniques combined with presaturation of stationary spins. Thus, a single line scan echo yields a projection of vessels due to the signal from reflowing unsaturated spins. Reconstruction of an angiographic image is performed line by line at slightly incremented positions. In particular, line scan angiography is direct and fast without a sensitivity to artifacts even for high flow rates. Image resolution and field of view may be chosen without restrictions, and zoom images using enhanced gradients may be recorded without aliasing artifacts. The method is robust with respect to eddy currents and pulsatile flow. Line scan MR angiograms of phantoms, animals, and human volunteers have been recorded using 90 0 radio frequency pulses and gradient-recalled echoes

  17. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1997-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  18. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1996-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  19. Field tests on migration of TRU-nuclide, (1). General introduction

    International Nuclear Information System (INIS)

    Ogawa, Hiromichi; Tanaka, Tadao; Mukai, Masayuki

    2003-01-01

    The field migration test using TRU nuclide was carried out as a cooperative research project between JAERI (Japan Atomic Energy Research Institute) and CIRP (China Institute for Radiation Protection). This report introduced the out-line of the field migration test and described the outline of the series of 'Field Test on Migration of TRU-nuclide' and main results as a summary report. (author)

  20. Development project of contraction, semi-contraction and owner`s-line firewood harvesting; Urakointi-, puoliurakointi- ja isaennaenlinjan polttopuunkorjuun kehittaemisprojekti

    Energy Technology Data Exchange (ETDEWEB)

    Reponen, K [Tume Oy, Muurame (Finland)

    1997-12-31

    The objective of the project was to develop a chopwood production method, in which the long length trees are felled, delimbed, cut and if necessary also chopped within the same processing stage. If the conditions so require, the chain has to be possible to change so, that cutting and chopping of stems are centralized and made in the same place, as done usually. A part of the project was focused on transportation and storage of chopwood at drying and utilization site. Available methods and equipment were surveyed in the beginning of the project. The machine and equipment needs of the project were listed. Following machines and equipment were needed: a grapple-loader, a forest trailer, a firewood harvester, a chopwood harvester, and drying, transportation and storage containers. The grapple-loader was designed, constructed in 1994, and testing started at the end of 1994. Testing of the loader continued in 1995. The chopwood harvester, based either on squeeze-cutting or spiral cutting, were tested and appeared to be operational. The operation of the chopwood harvester is based on pulsed feeding. The operation of the harvester can be changed, if needed, to suit for felling of the stem and delimbing, or a device cutting the stems into desired length or a splitting device can be mounted to it. The implementation of the pulsed feeding and delimbing are made traditionally. The construction of the pulsed chopwood harvester was done by a forest owner/inventor entrepreneur. The prototype was ready for testing in summer 1995. Felling and delimbing tests were started immediately. Splitting action has not been constructed yet. Drying/transportation/storage contained will be constructed later

  1. Development project of contraction, semi-contraction and owner`s-line firewood harvesting; Urakointi-, puoliurakointi- ja isaennaenlinjan polttopuunkorjuun kehittaemisprojekti

    Energy Technology Data Exchange (ETDEWEB)

    Reponen, K. [Tume Oy, Muurame (Finland)

    1996-12-31

    The objective of the project was to develop a chopwood production method, in which the long length trees are felled, delimbed, cut and if necessary also chopped within the same processing stage. If the conditions so require, the chain has to be possible to change so, that cutting and chopping of stems are centralized and made in the same place, as done usually. A part of the project was focused on transportation and storage of chopwood at drying and utilization site. Available methods and equipment were surveyed in the beginning of the project. The machine and equipment needs of the project were listed. Following machines and equipment were needed: a grapple-loader, a forest trailer, a firewood harvester, a chopwood harvester, and drying, transportation and storage containers. The grapple-loader was designed, constructed in 1994, and testing started at the end of 1994. Testing of the loader continued in 1995. The chopwood harvester, based either on squeeze-cutting or spiral cutting, were tested and appeared to be operational. The operation of the chopwood harvester is based on pulsed feeding. The operation of the harvester can be changed, if needed, to suit for felling of the stem and delimbing, or a device cutting the stems into desired length or a splitting device can be mounted to it. The implementation of the pulsed feeding and delimbing are made traditionally. The construction of the pulsed chopwood harvester was done by a forest owner/inventor entrepreneur. The prototype was ready for testing in summer 1995. Felling and delimbing tests were started immediately. Splitting action has not been constructed yet. Drying/transportation/storage contained will be constructed later

  2. Final project report: High energy rotor development, test and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  3. A Unit-Test Framework for Database Applications

    DEFF Research Database (Denmark)

    Christensen, Claus Abildgaard; Gundersborg, Steen; de Linde, Kristian

    The outcome of a test of an application that stores data in a database naturally depends on the state of the database. It is therefore important that test developers are able to set up and tear down database states in a simple and efficient manner. In existing unit-test frameworks, setting up...... test can be minimized. In addition, the reuse between unit tests can speed up the execution of test suites. A performance test on a medium-size project shows a 40% speed up and an estimated 25% reduction in the number of lines of test code....

  4. Profile of Students' Creative Thinking Skills on Quantitative Project-Based Protein Testing using Local Materials

    Directory of Open Access Journals (Sweden)

    D. K. Sari

    2017-04-01

    Full Text Available The purpose of this study is to obtain a profile of students’ creative thinking skills on quantitative project-based protein testing using local materials. Implementation of the research is using quasi-experimental method pre-test post-test control group design with 40 students involved in Biochemistry lab. The research instrument is pre-test and post-test using creative thinking skills in the form of description and students’ questionnaire. The analysis was performed with SPSS 22.0 program to see the significance normality, U Mann-Whitney test for nonparametric statistics, N-Gain score, and the percentage of student responses to the practicum performed. The research result shows that the pretest rate in the experimental group is 8.25 while in the control group is 6.90. After attending a project-based practicum with local materials, the experimental group obtained the mean of posttest is 37.55 while in control class is 11.18. The students’ improvement on creative thinking skills can be seen from the average of N-Gain in the experimental class with 0.32 (medium category and in the control category with 0.05 (low category. The experimental and control class have different creative thinking skills significantly different fluency, flexibility, novelty, and detail. It can be concluded that quantitative project-based protein testing using local materials can improve students’ creative thinking skills. 71% of total students feel that quantitative project-based protein testing using local materials make them more creative in doing a practicum in the laboratory.

  5. Registration of Urban Aerial Image and LiDAR Based on Line Vectors

    Directory of Open Access Journals (Sweden)

    Qinghong Sheng

    2017-09-01

    Full Text Available In a traditional registration of a single aerial image with airborne light detection and ranging (LiDAR data using linear features that regard line direction as a control or linear features as constraints in the solution, lacking the constraint of linear position leads to the error propagation of the adjustment model. To solve this problem, this paper presents a line vector-based registration mode (LVR in which image rays and LiDAR lines are expressed by a line vector that integrates the line direction and the line position. A registration equation of line vector is set up by coplanar imaging rays and corresponding control lines. Three types of datasets consisting of synthetic, theInternational Society for Photogrammetry and Remote Sensing (ISPRS test project, and real aerial data are used. A group of progressive experiments is undertaken to evaluate the robustness of the LVR. Experimental results demonstrate that the integrated line direction and the line position contributes a great deal to the theoretical and real accuracies of the unknowns, as well as the stability of the adjustment model. This paper provides a new suggestion that, for a single image and LiDAR data, registration in urban areas can be accomplished by accommodating rich line features.

  6. Offsite testing in support of the Salt Repository Project

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1987-04-01

    This report presents a rationale and recommendation to perform an offsite testing program in support of the Salt Repository Project. The investigation to be performed primarily consists of qualifying test methods and procedures, qualifying personnel-training procedures, evaluating test instruments and selected equipment, and obtaining mining and production equipment performance-related information. The key objective of these activities is to develop capabilities to be used at the exploratory shaft facility (ESF). The ESF is to be excavated at the Deaf Smith County site to characterize the salt site for the construction of a repository used to isolate radioactive waste from the biosphere. The bulk of the offsite testing work will be performed at Avery Island Salt Mine at New Iberia, Lousiana. Additional knowledge will be obtained by exchanging technical information either as participants or as observers at the Waste Isolation Pilot Plant (WIPP) site and the Asse Mine in the Federal Republic of Germany (FRG). It is estimated that the offsite testing program will cost approximately $9.3 million over 4 fiscal years. 14 refs., 1 fig., 8 tabs

  7. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  8. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Energy Technology Data Exchange (ETDEWEB)

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  9. Analysis of dynamic accumulative damage about the lining structure of high speed railway’s tunnel based on ultrasonic testing technology

    Science.gov (United States)

    Wang, Xiang-qiu; Zhang, Huojun; Xie, Wen-xi

    2017-08-01

    Based on the similar material model test of full tunnel, the theory of elastic wave propagation and the testing technology of intelligent ultrasonic wave had been used to research the dynamic accumulative damage characteristics of tunnel’s lining structure under the dynamic loads of high speed train. For the more, the dynamic damage variable of lining structure of high speed railway’s tunnel was obtained. The results shown that the dynamic cumulative damage of lining structure increases nonlinearly with the times of cumulative vibration, the weakest part of dynamic cumulative damage is the arch foot of tunnel. Much more attention should be paid to the design and operation management of high speed railway’s tunnel.

  10. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  11. Microculture-based chemosensitivity testing: a feasibility study comparing freshly explanted human melanoma cells with human melanoma cell lines.

    Science.gov (United States)

    Marshall, E S; Finlay, G J; Matthews, J H; Shaw, J H; Nixon, J; Baguley, B C

    1992-03-04

    The culture of cancer cells has many applications in chemosensitivity testing and new drug development. Our goal was to adapt simple semiautomated microculture methods for testing the chemosensitivity of melanoma cells freshly recovered from patients' tumors. Cells were cultured on a substrate of agarose and exposed continuously to cytotoxic drugs, the effects of which were measured by determining the uptake of [3H]thymidine 4-7 days later. Immunocytochemical staining of cells cultured with 5-bromo-2'-deoxyuridine demonstrated that tumor cells were responsible for the measured thymidine incorporation. The effects of cytotoxic drugs were calculated as logarithmic 50% inhibitory concentrations and expressed as divergences from the mean in a log-mean graph. The inhibitory effects of amsacrine, etoposide, doxorubicin, cisplatin, mitomycin C, and fluorouracil were tested. Tumors differed widely in their sensitivity to these drugs, although sensitivity to the three topoisomerase-II-directed agents was highly correlated. Cells from two non-neoplastic hematopoietic progenitor cell lines (FT and 32D) showed chemosensitivity patterns distinct from those in the melanoma cells, indicating tissue selectivity. Two established melanoma cell lines, MM-96 and FME, were tested under the same conditions and showed sensitivity typical of at least some fresh specimens. These results support the validity of melanoma cell lines as models of freshly resected melanoma cells. If successfully applied to other tumor types, such semiautomated approaches could find wide application in routine hospital laboratories for the chemosensitivity testing of patients' tumor cells.

  12. Code Assessment of SPACE 2.19 using LSTF 10% Main Steam-Line-Break Test

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Minhee; Kim, Seyun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The Safety and Performance Analysis Code for Nuclear Power Plants (SPACE) has been developed in recent years by the Korea Hydro and Nuclear Power Co. through collaborative works with other Korean nuclear industries and research institutes. As a result of the development, the 2.19 version of the code was released through the successive various verification and validation works. In this study, results produced by the SPACE 2.19 code were compared with the experimental data from JAERI's LSTF Test Run SBSL- 01 for a 10% main steam line break transient in a pressurized water reactor. The LSTF 10% main steam line break test were simulated using the SPACE 2.19 for code V and V work. The overall comparisons between the SPACE 2.19 code prediction and the LSTF Test Run SB-SL-01 experimental data are reasonably satisfactory. The comparisons were conducted in terms of the variations of mass flow rate, void fraction, pressure, collapsed liquid level, temperature, and system flow rate for the transient. In addition, the input model was modified for simulation accuracy of PZR pressure based on the calculated results. The correction of PORV setpoint affects to simulate the PORV open and close phenomena similarly with experiments. From the modification, the computed results show a reasonable agreement with experimental data in overall transient time.

  13. Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1996-05-01

    The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO's circuit on new right-of-way, and reconductoring Western's existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations

  14. Generation of on-line test signals for nuclear instrumentation for PFBR

    International Nuclear Information System (INIS)

    Ram, Rajit; Bhatnagar, P.V.; Rajesh, M.G.; Das, Debashis

    2010-01-01

    Neutron flux monitoring system for PFBR employs pulse signal processing in start up and intermediate power range of reactor operation and Campbell signal processing in intermediate and full power range of reactor operation. Pulse signal processing unit as well as Campbell signal processing unit incorporates FPGA that generates pulse/white noise signal for on-line testing and diagnostic of the channels. In pulse channel fixed/linearly/exponentially varying pulse rate signal is generated over three decades of reactor operation. In the Campbell channel, Poisson distributed noise varying linearly/exponentially is generated over four decades of reactor operation. Multiple numbers of Poisson distributed random pulse trains are summed and amplified to get the white noise signal. Exponentially increasing gain pattern, generated by MATLAB is used to increase the RMS value of the generated noise. The paper discuses the successful testing and validation of pulse and Campbell channel by making use of the generated pulse/white noise signal over wide range of operation for nuclear instrumentation. (author)

  15. Beam Optics for Typical Part of ISOL Beam Lines

    International Nuclear Information System (INIS)

    Jang, Ji Ho; Kwon, Hyeok Jung; Kim, Han Sung; Cho, Yong Sub

    2013-01-01

    KOMAC (Korea Multi-purpose Accelerator Complex) is doing a project, the detailed design of the ISOL beam lines for the heavy ion accelerator project of IBS (Institute of Basic Science) from August 2013 to February 2014. The heavy ion beams are transported by using the electrostatic quadrupoles and electrostatic benders between the equipment. The work-scope of the project is the beam optics design of the beam lines and the detailed design of the beam optics components, the electrostatic quadrupoles and the electrostatic bender. This work summarized the initial result of beam optics design of the beam line. We performed the beam optics simulation in two regions of ISOL beam lines and found that beam envelope is less than 2 cm. We will check that the poletip file values are reasonable or not in near future, and we also applied this method to the other parts of the ISOL beam line and optimize them. The result will be used the detailed design of the electrostatic quadrupoles and benders

  16. Economic impact analysis of short line railroads.

    Science.gov (United States)

    2014-10-01

    This research project assesses the economic role and impact of short line railroads in the state of Louisiana. While relatively small in : scope, with 11 operators and approximately 500 miles of track, short line railroads play a significant role in ...

  17. Product line design

    Czech Academy of Sciences Publication Activity Database

    Anderson, S. P.; Celik, Levent

    2015-01-01

    Roč. 157, May (2015), s. 517-526 ISSN 0022-0531 R&D Projects: GA ČR(CZ) GA15-22540S Institutional support: PRVOUK-P23 Keywords : product line design * product differentiation * second-degree price discrimination Subject RIV: AH - Economics Impact factor: 1.097, year: 2015

  18. Line-scan inspection of conifer seedlings

    Science.gov (United States)

    Rigney, Michael P.; Kranzler, Glenn A.

    1993-05-01

    Almost two billion conifer seedlings are produced in the U.S. each year to support reforestation efforts. Seedlings are graded manually to improve viability after transplanting. Manual grading is labor-intensive and subject to human variability. Our previous research demonstrated the feasibility of automated tree seedling inspection with machine vision. Here we describe a system based on line-scan imaging, providing a three-fold increase in resolution and inspection rate. A key aspect of the system is automatic recognition of the seedling root collar. Root collar diameter, shoot height, and projected shoot and root areas are measured. Sturdiness ratio and shoot/root ratio are computed. Grade is determined by comparing measured features with pre-defined set points. Seedlings are automatically sorted. The precision of machine vision and manual measurements was determined in tests at a commercial forest nursery. Manual measurements of stem diameter, shoot height, and sturdiness ratio had standard deviations three times those of machine vision measurements. Projected shoot area was highly correlated (r2 equals 0.90) with shoot volume. Projected root area had good correlation (r2 equals 0.80) with root volume. Seedlings were inspected at rates as high as ten per second.

  19. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  20. The use of safeguards data for process monitoring in the Advanced Test Line for Actinide Separations

    International Nuclear Information System (INIS)

    Barnes, J.W.; Yarbro, S.L.

    1987-01-01

    Los Alamos is constructing an integrated process monitoring/materials control and accounting (PM/MC and A) system in the Advanced Testing Line for Actinide Separations (ATLAS) at the Los Alamos Plutonium Facility. The ATLAS will test and demonstrate new methods for aqueous processing of plutonium. The ATLAS will also develop, test, and demonstrate the concepts for integrated process monitoring/materials control and accounting. We describe how this integrated PM/MC and A system will function and provide benefits to both process research and materials accounting personnel

  1. Validity and reliability of the single-trial line drill test of anaerobic power in basketball players.

    Science.gov (United States)

    Fatouros, I G; Laparidis, K; Kambas, A; Chatzinikolaou, A; Techlikidou, E; Katrabasas, I; Douroudos, I; Leontsini, D; Berberidou, F; Draganidis, D; Christoforidis, C; Tsoukas, D; Kelis, S; Taxildaris, K

    2011-03-01

    This study evaluated the validity, reliability, and sensitivity of the single-trial line drill test (SLDT) for anaerobic power assessment. Twenty-four volunteers were assigned to either a control (C, N.=12) or an experimental (BP, N.=12 basketball players) group. SLDT's (time-to-complete) concurrent validity was evaluated against the Wingate testing (WAnT: mean [MP] and peak power [PP]) and a 30-sec vertical jump testing test (VJT: mean height and MP). Blood lactate concentration was measured at rest and immediately post-test. SLDT's reliability [test-retest intraclass correlation coefficients (ICC), coefficient of variation (CV), Bland-Altman plots] and sensitivity were determined (one-way ANOVA). Kendall's tau correlation analysis revealed correlations (Pbasketball players.

  2. LS1 Report: The cryogenic line goes through the scanner

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    In spite of the complexity of LS1, with many different activities taking place in parallel and sometimes overlapping, the dashboard shows that work is progressing on schedule. This week, teams have started X-raying the cryogenic line to examine its condition in minute detail.   The LS1 schedule is pretty unfathomable for those who don't work in the tunnels or installations, but if you look down all the columns and stop at the line indicating today’s date, you can see that all of the priority and critical items are bang on time, like a Swiss watch. More specifically: the SMACC project in the LHC is on schedule, with a new testing phase for the interconnections which have already been consolidated; preparations are under way for the cable replacement campaign at Point 1 of the SPS (about 20% of the cables will not be replaced as they are completely unused); and the demineralised water distribution line is back in service, as are the electrical substations for the 400 and 66 kV line...

  3. Malaria rapid diagnostic tests: Plasmodium falciparum infections with high parasite densities may generate false positive Plasmodium vivax pLDH lines

    Directory of Open Access Journals (Sweden)

    van Esbroeck Marjan

    2010-07-01

    Full Text Available Abstract Background Most malaria rapid diagnostic tests (RDTs detect Plasmodium falciparum and an antigen common to the four species. Plasmodium vivax-specific RDTs target P. vivax-specific parasite lactate dehydrogenase (Pv-pLDH. Previous observations of false positive Pv-pLDH test lines in P. falciparum samples incited to the present study, which assessed P. vivax-specific RDTs for the occurrence of false positive Pv-pLDH lines in P. falciparum samples. Methods Nine P. vivax-specific RDTs were tested with 85 P. falciparum samples of high (≥2% parasite density. Mixed P. falciparum/P. vivax infections were ruled out by real-time PCR. The RDTs included two-band (detecting Pv-pLDH, three-band (detecting P. falciparum-antigen and Pv-pLDH and four-band RDTs (detecting P. falciparum, Pv-pLDH and pan-pLDH. Results False positive Pv-pLDH lines were observed in 6/9 RDTs (including two- three- and four-band RDTs. They occurred in the individual RDT brands at frequencies ranging from 8.2% to 29.1%. For 19/85 samples, at least two RDT brands generated a false positive Pv-pLDH line. Sixteen of 85 (18.8% false positive lines were of medium or strong line intensity. There was no significant relation between false positive results and parasite density or geographic origin of the samples. Conclusion False positive Pv-pLDH lines in P. falciparum samples with high parasite density occurred in 6/9 P. vivax-specific RDTs. This is of concern as P. falciparum and P. vivax are co-circulating in many regions. The diagnosis of life-threatening P. falciparum malaria may be missed (two-band Pv-pLDH RDT, or the patient may be treated incorrectly with primaquine (three- or four-band RDTs.

  4. Overview and status of the prototype project for Wendelstein 7-X control system

    Energy Technology Data Exchange (ETDEWEB)

    Schacht, Joerg [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)], E-mail: joerg.schacht@ipp.mpg.de; Bluhm, Torsten; Herbst, Uwe; Hennig, Christine; Heinrich, Stefan; Kuehner, Georg; Koester, Erik; Laqua, Heike; Lewerentz, Marc; Marquardt, Mirco; Meyer, Christiane; Mueller, Ina; Pingel, Steffen; Sachtleben, Juergen; Spring, Anett; Werner, Andreas; Woelk, Andreas [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)

    2009-06-15

    This contribution gives an overview of the project 'Prototype W7-X control system'. The objective of this prototype project is to demonstrate the applicability of the segment orientated control system at a running fusion experiment including steady-state operation, interaction of all relevant components, real time control, data acquisition and on-line data analysis. Furthermore, the W7-X safety concept will be implemented at WEGA and tested.

  5. Preliminary project definition for long duration. Tests of coal fired MHD generators

    International Nuclear Information System (INIS)

    Van der Laken, R.A.

    1992-01-01

    In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator

  6. Performance test of Si PIN photodiode line scanner for thermal neutron detection

    Energy Technology Data Exchange (ETDEWEB)

    Totsuka, Daisuke, E-mail: totsuka@imr.tohoku.ac.jp [Institute for Materials Research, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai, Miyagi 980-8577 (Japan); Nihon Kessho Kogaku Co., Ltd., 810-5 Nobe-cho Tatebayashi, Gunma 374-0047 (Japan); Yanagida, Takayuki [New Industry Creation Hatchery Center (NICHe) 6-6-10 Aoba, Aramaki, Aoba-ku, Sendai, Miyagi 980-8579 (Japan); Fukuda, Kentaro; Kawaguchi, Noriaki [Tokuyama Corp., 3 Shibuya Shibuya-ku, Tokyo 150-8383 (Japan); Fujimoto, Yutaka [Institute for Materials Research, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai, Miyagi 980-8577 (Japan); Pejchal, Jan [Institute of Physics AS CR, Cukrovarnicka 10, Prague 6, 162-53 (Czech Republic); Yokota, Yuui [Institute for Materials Research, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai, Miyagi 980-8577 (Japan); Yoshikawa, Akira [Institute for Materials Research, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai, Miyagi 980-8577 (Japan); New Industry Creation Hatchery Center (NICHe) 6-6-10 Aoba, Aramaki, Aoba-ku, Sendai, Miyagi 980-8579 (Japan)

    2011-12-11

    Thermal neutron imaging using Si PIN photodiode line scanner and Eu-doped LiCaAlF{sub 6} crystal scintillator has been developed. The pixel dimensions of photodiode are 1.18 mm (width) Multiplication-Sign 3.8 mm (length) with 0.4 mm gap and the module has 192 channels in linear array. The emission peaks of Eu-doped LiCaAlF{sub 6} after thermal neutron excitation are placed at 370 and 590 nm, and the corresponding photon sensitivities of photodiode are 0.04 and 0.34 A/W, respectively. Polished scintillator blocks with a size of 1.18 mm (width) Multiplication-Sign 3.8 mm (length) Multiplication-Sign 5.0 mm (thickness) were wrapped by several layers of Teflon tapes as a reflector and optically coupled to the photodiodes by silicone grease. JRR-3 MUSASI beam line emitting 13.5 meV thermal neutrons with the flux of 8 Multiplication-Sign 10{sup 5} n/cm{sup 2} s was used for the imaging test. As a subject for imaging, a Cd plate was moved at the speed of 50 mm/s perpendicular to the thermal neutron beam. Analog integration time was set to be 416.6 {mu}s, then signals were converted by a delta-sigma A/D converter. After the image processing, we successfully obtained moving Cd plate image under thermal neutron irradiation using PIN photodiode line scanner coupled with Eu-doped LiCaAlF{sub 6} scintillator.

  7. Performance test of Si PIN photodiode line scanner for thermal neutron detection

    International Nuclear Information System (INIS)

    Totsuka, Daisuke; Yanagida, Takayuki; Fukuda, Kentaro; Kawaguchi, Noriaki; Fujimoto, Yutaka; Pejchal, Jan; Yokota, Yuui; Yoshikawa, Akira

    2011-01-01

    Thermal neutron imaging using Si PIN photodiode line scanner and Eu-doped LiCaAlF 6 crystal scintillator has been developed. The pixel dimensions of photodiode are 1.18 mm (width)×3.8 mm (length) with 0.4 mm gap and the module has 192 channels in linear array. The emission peaks of Eu-doped LiCaAlF 6 after thermal neutron excitation are placed at 370 and 590 nm, and the corresponding photon sensitivities of photodiode are 0.04 and 0.34 A/W, respectively. Polished scintillator blocks with a size of 1.18 mm (width)×3.8 mm (length)×5.0 mm (thickness) were wrapped by several layers of Teflon tapes as a reflector and optically coupled to the photodiodes by silicone grease. JRR-3 MUSASI beam line emitting 13.5 meV thermal neutrons with the flux of 8×10 5 n/cm 2 s was used for the imaging test. As a subject for imaging, a Cd plate was moved at the speed of 50 mm/s perpendicular to the thermal neutron beam. Analog integration time was set to be 416.6 μs, then signals were converted by a delta-sigma A/D converter. After the image processing, we successfully obtained moving Cd plate image under thermal neutron irradiation using PIN photodiode line scanner coupled with Eu-doped LiCaAlF 6 scintillator.

  8. History of the water chemistry for the few tube test model

    International Nuclear Information System (INIS)

    Moss, S.A.; Simpson, J.L.

    1979-09-01

    The water chemistry activities carried out in support of the Few Tube Test are described. This test was conducted to provide design confirmation data for the Clinch River Breeder Reactor Project (CRBRP) steam generators. Proposed CRBRP chemistry was followed; all volatile treatment (AVT) of water was carried out with on-line monitoring capability

  9. Development and calibration of an on-line aerosol monitor for PHEBUS test FPT1

    International Nuclear Information System (INIS)

    O'Brien, J.E.; Carmack, W.J.; Sprenger, M.H.; Thurston, G.C.; Hunt, J.L.

    1994-10-01

    An on-line aerosol monitor (OLAM2) has been developed and tested for PHEBUS test FPT1. OLAM2 utilizes new detachable fiber optic cables and sapphire light pipes for light transmission between the OLAM and the electronics. This light transmission system was tested and found to provide better signal-to-noise performance than was achieved with the continuous fibers used for test FPT0. An additional advantage of the detachable fiber/light pipe system is ease of installation. Aerosol testing (OLAM calibration) was performed in order to verify adequate signal-to-noise performance of the new fiber optic system over the specified operating conditions and to check the quantitative light attenuation measurements against theoretical predictions. Results of the testing indicated that light extinction measurements obtained during Phebus tests could be used to estimate aerosol volume concentrations, if diamond window fouling can be avoided. OLAM2 was also subjected to a proof pressure test and a long-term thermal stability test. These tests verified the mechanical and thermal integrity of the OLAM within design specifications. Long-term output signal stability was also verified with the system maintained at design temperature and half-design pressure

  10. Advanced power cycling test for power module with on-line on-state VCE measurement

    DEFF Research Database (Denmark)

    Choi, Ui-min; Trintis, Ionut; Blaabjerg, Frede

    2015-01-01

    module. The proposed concept can perform various stress conditions which is valid in a real mission profile and it is using a real power converter application with small loss. The concept of the proposed test setup is first presented. Then, the on-line on-state collector-emitter voltage VCE measurement......Recent research has made an effort to improve the reliability of power electronic systems to comply with more stringent constraints on cost, safety, predicted lifetime and availability in many applications. For this, studies about failure mechanisms of power electronic components and lifetime...... estimation of power semiconductor devices and capacitors have been done. Accelerated power cycling test is one of the common tests to assess the power device module and develop the lifetime model considering the physics of failure. In this paper, a new advanced power cycling test setup is proposed for power...

  11. Pre-service proof pressure and leak rate tests for the Qinshan CANDU project reactor buildings

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The Qinshan CANDU Project Reactor Buildings (Units 1 and 2) have been successfully tested for the Pre-Service Proof Pressure and Integrated Leak Rate Tests. The Unit 1 tests took place from May 3 to May 9, 2002 and from May 22 to May 25, 2002, and the Unit 2 tests took place from January 21 to January 27, 2003. This paper discusses the significant steps taken at minimum cost on the Qinshan CANDU Project, which has resulted in a) very good leak rate (0.21%) for Unit 1 and excellent leak rate (0.130%) for Unit 2; b) continuous monitoring of the structural behaviour during the Proof Pressure Test, thus eliminating any repeat of the structural test due to lack of data; and c) significant schedule reduction achieved for these tests in Unit 2. (author)

  12. HB-Line Special Nuclear Material Campaigns: Model-Based Project Management

    International Nuclear Information System (INIS)

    CHANG, ROBERT

    2004-01-01

    This study is to show how a model was used to enable management to better estimate production capabilities to ensure contract milestones/commitments are met, to cope with fast changing project baselines and project missions, to ensure the project will meet the negotiated throughput, and to eliminate unnecessary but costly design changes

  13. TEST OF COTTON LINES WITH DROUGHT TOLERANT INTERCROPPED WITH MAIZE

    Directory of Open Access Journals (Sweden)

    Kadarwati F.T.

    2017-12-01

    Full Text Available The distribution of cotton cultivation is mostly located in the sub-optimal land due to competition with the field crop. The cotton cultivation in Indonesia is always done through intercropping with pulses. This research aims to test the suitability of cotton lines with drought-tolerant intercropped with maize. The research is conducted in February to August 2016 at Asembagus Experimental Garden, Situbondo. Planting materials used in this research are 6 lines and 2 varieties of drought-tolerant cotton consist of strain 03001/9, 03008/24, 03008/25, 03017/13, 06062/3, 06063/3, kanesia 10 and kanesia 14. The research prepared by the draft randomized group with three replications. The observation parameter consists of plant height, canopy width, number of generative branches, number of fruits, fruits weight, the yield of seed cotton, and corn dry results. The research result shows that the strain 03017/13 and 03008/24 have the highest consecutive acceptance of IDR 17,860,681 and IDR 17,520,879, the increase in revenue compared to monoculture is IDR 6,278,473 and IDR 5,668,191, seed cotton production amounted to 2470.01 kg/ha and 2329.72 kg/ha, maize production amounted to 2001.54 kg/ha and 2112.74 kg/ha, LER 1.68 and 1.60, number of harvested fruit of 12.66 and 11.76 fruits/plant, fruit weight of 4.05 and 4.17 g/fruit.

  14. Testing the Kerr black hole hypothesis: Comparison between the gravitational wave and the iron line approaches

    Energy Technology Data Exchange (ETDEWEB)

    Cárdenas-Avendaño, Alejandro [Center for Field Theory and Particle Physics and Department of Physics, Fudan University, 200433 Shanghai (China); Programa de Matemática, Fundación Universitaria Konrad Lorenz, 110231 Bogotá (Colombia); Jiang, Jiachen [Center for Field Theory and Particle Physics and Department of Physics, Fudan University, 200433 Shanghai (China); Bambi, Cosimo, E-mail: bambi@fudan.edu.cn [Center for Field Theory and Particle Physics and Department of Physics, Fudan University, 200433 Shanghai (China); Theoretical Astrophysics, Eberhard-Karls Universität Tübingen, 72076 Tübingen (Germany)

    2016-09-10

    The recent announcement of the detection of gravitational waves by the LIGO/Virgo Collaboration has opened a new window to test the nature of astrophysical black holes. Konoplya & Zhidenko have shown how the LIGO data of GW 150914 can constrain possible deviations from the Kerr metric. In this letter, we compare their constraints with those that can be obtained from accreting black holes by fitting their X-ray reflection spectrum, the so-called iron line method. We simulate observations with eXTP, a next generation X-ray mission, finding constraints much stronger than those obtained by Konoplya & Zhidenko. Our results can at least show that, contrary to what is quite commonly believed, it is not obvious that gravitational waves are the most powerful approach to test strong gravity. In the presence of high quality data and with the systematics under control, the iron line method may provide competitive constraints.

  15. Software Sub-system in Loading Automatic Test System for the Measurement of Power Line Filters

    Directory of Open Access Journals (Sweden)

    Yu Bo

    2017-01-01

    Full Text Available The loading automatic test system for measurement of power line filters are in urgent demand. So the software sub-system of the whole test system was proposed. Methods: structured the test system based on the virtual instrument framework, which consisted of lower and up computer and adopted the top down approach of design to perform the system and its modules, according to the measurement principle of the test system. Results: The software sub-system including human machine interface, data analysis and process software, expert system, communication software, control software in lower computer, etc. had been designed. Furthermore, it had been integrated into the entire test system. Conclusion: This sub-system provided a fiendly software platform for the whole test system, and had many advantages such as strong functions, high performances, low prices. It not only raises the test efficiency of EMI filters, but also renders some creativities.

  16. AMS Ground Truth Measurements: Calibration and Test Lines

    International Nuclear Information System (INIS)

    Wasiolek, P.

    2013-01-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima nuclear power plant (NPP) accident in March-May 2011. To map ground contamination a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count rate data expressed in counts per second (cps) needs to be converted to the terrestrial component of the exposure rate 1 m above ground, or surface activity of isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, as the production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish very early into the event a common calibration line. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements. This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  17. AMS Ground Truth Measurements: Calibrations and Test Lines

    Energy Technology Data Exchange (ETDEWEB)

    Wasiolek, Piotr T. [National Security Technologies, LLC

    2015-12-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima NPP accident in March-May 2011. To map ground contamination, a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count data, expressed in counts per second (cps), need to be converted to a terrestrial component of the exposure rate at 1 meter (m) above ground, or surface activity of the isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large-scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, because production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish a common calibration line very early into the event. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and that are potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  18. Evaluation of HIV testing algorithms in Ethiopia: the role of the tie-breaker algorithm and weakly reacting test lines in contributing to a high rate of false positive HIV diagnoses.

    Science.gov (United States)

    Shanks, Leslie; Siddiqui, M Ruby; Kliescikova, Jarmila; Pearce, Neil; Ariti, Cono; Muluneh, Libsework; Pirou, Erwan; Ritmeijer, Koert; Masiga, Johnson; Abebe, Almaz

    2015-02-03

    In Ethiopia a tiebreaker algorithm using 3 rapid diagnostic tests (RDTs) in series is used to diagnose HIV. Discordant results between the first 2 RDTs are resolved by a third 'tiebreaker' RDT. Médecins Sans Frontières uses an alternate serial algorithm of 2 RDTs followed by a confirmation test for all double positive RDT results. The primary objective was to compare the performance of the tiebreaker algorithm with a serial algorithm, and to evaluate the addition of a confirmation test to both algorithms. A secondary objective looked at the positive predictive value (PPV) of weakly reactive test lines. The study was conducted in two HIV testing sites in Ethiopia. Study participants were recruited sequentially until 200 positive samples were reached. Each sample was re-tested in the laboratory on the 3 RDTs and on a simple to use confirmation test, the Orgenics Immunocomb Combfirm® (OIC). The gold standard test was the Western Blot, with indeterminate results resolved by PCR testing. 2620 subjects were included with a HIV prevalence of 7.7%. Each of the 3 RDTs had an individual specificity of at least 99%. The serial algorithm with 2 RDTs had a single false positive result (1 out of 204) to give a PPV of 99.5% (95% CI 97.3%-100%). The tiebreaker algorithm resulted in 16 false positive results (PPV 92.7%, 95% CI: 88.4%-95.8%). Adding the OIC confirmation test to either algorithm eliminated the false positives. All the false positives had at least one weakly reactive test line in the algorithm. The PPV of weakly reacting RDTs was significantly lower than those with strongly positive test lines. The risk of false positive HIV diagnosis in a tiebreaker algorithm is significant. We recommend abandoning the tie-breaker algorithm in favour of WHO recommended serial or parallel algorithms, interpreting weakly reactive test lines as indeterminate results requiring further testing except in the setting of blood transfusion, and most importantly, adding a confirmation test

  19. Eccentric vision : adverse interactions between line segments

    NARCIS (Netherlands)

    Andriessen, J.J.; Bouma, H.

    1976-01-01

    The paper deals with adverse interactions between line stimuli ineccentric vision. Bothcontrast thresholdandjust noticeable difference of slanthave been measured for a test line as a function of the distance from a number of surrounding lines. Test lines were either parallel or perpendicular to the

  20. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  1. Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project

    International Nuclear Information System (INIS)

    Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

    1998-01-01

    This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle

  2. Overview of fuel testing capabilities at the OECD Halden reactor project

    Energy Technology Data Exchange (ETDEWEB)

    Wiesenack, W [Institutt for Atomenergi, Halden (Norway). OECD Halden Reaktor Projekt

    1994-12-31

    Fuel performance and reliability investigations at the OECD Haiden Reactor Project are described. They are supported by a variety of irradiation rigs, suitable irradiation techniques and a range of instrumentation. Testing capabilities and applications are mainly aimed at exploring mechanisms of fuel behaviour and high burnup. Examples of fuel performance taken from data provided by the Halden Project for the IAEA Co-ordinated Research Programme FUMEX are presented. A number of heavily instrumented rigs to suit different test objects have been developed: base irradiation rig, gas meter rig, diameter measurement rig, ramp rig, gas flow rig, instrumented fuel assembly. In core-measurements and variety of sensors as : fuel thermocouples, bellows pressure transducers, fuel stack elongation detectors, cladding diameter gauge and cladding elongation detectors have been used. Techniques which make it possible to obtain reliable data for all relevant burnups from beginning-of-life to ultra high exposure reaching 100 Mwd/kg UO{sub 2} are described. 7 figs., 3 refs.

  3. Composite Based EHV AC Overhead Transmission Lines

    DEFF Research Database (Denmark)

    Sørensen, Thomas Kjærsgaard

    and analysed with regard to the possibilities, limitations and risks widespread application of composite materials on EHV AC overhead transmission lines may present. To form the basis for evaluation of the useability of composite materials, dierent overhead line projects aimed at reducing the environmental...

  4. DOE-EPRI On-Line Monitoring Implementation Guidelines

    International Nuclear Information System (INIS)

    E. Davis, R. Bickford

    2003-01-01

    Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years

  5. Dosimetry of irradiation models. The 96-well clonogenic assay for testing radiosensitivity of cell lines

    International Nuclear Information System (INIS)

    Kulmala, J.; Rantanen, V.; Turku Univ.; Pekkola-Heino, K.; Turku Univ.; Tuominen, J.; Grenman, R.; Turku Univ.

    1995-01-01

    Radiation experiments with cells in single cell suspension in test tubes and on 96-well plates were carried out and compared. The cells originated from cell lines established from carcinomas of the floor of the mouth and from endometrical carcinoma. Two irradiation models were constructed. Both models allowed the absorbed doses to the cells to be administered with a high accuracy in both experimental settings (better than 5.0%). These irradiation models were compared on cancer cell lines with dissimilar inherent radiation sensitivity and histologic type (UM-SCC-1 resistant, UM-SCC-14A sensitive, and UT-EC-2B highly sensitive); various radiation doses were used. The fractions of surviving cells as a function of radiation dose were compared: there was no significant difference between cells irradiated in test tubes and cells irradiated in 96-well plates. Thus, if the absorbed doses in cells suspended in a tube and in a plate were the same, the survival was similar regardless of the type of irradiation model. (orig.)

  6. Child-Robot Interaction in the Wild : Field Testing Activities of the ALIZ-E Project

    NARCIS (Netherlands)

    Greeff, J. de; Blanson Henkemans, O.A.; Fraaije, A.; Solms, L.; Wigdor, N.; Bierman, B.

    2014-01-01

    A field study was conducted in which CRI activities developed by the ALIZ-E project were tested with the project's primary user group: children with diabetes. This field study resulted in new insights in the modalities and roles a robot aimed at CRI in a healthcare setting might utilise, while in

  7. A Distributed System for Learning Programming On-Line

    Science.gov (United States)

    Verdu, Elena; Regueras, Luisa M.; Verdu, Maria J.; Leal, Jose P.; de Castro, Juan P.; Queiros, Ricardo

    2012-01-01

    Several Web-based on-line judges or on-line programming trainers have been developed in order to allow students to train their programming skills. However, their pedagogical functionalities in the learning of programming have not been clearly defined. EduJudge is a project which aims to integrate the "UVA On-line Judge", an existing…

  8. Project subsidized by the Sunshine Project in fiscal 1982. Report on achievements in the project commissioned from NEDO - research and development on return of low-temperature hot water (simulated return test and a demonstration return test); 1982 nendo teion nessui kangen ni kansuru kenkyu kaihatsu seika hokokusho. Kangen mogi shiken kangen jissho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    Tests and researches were performed with an objective to elucidate a decaying mechanism of return wells when low-temperature hot water utilized for geothermal binary power generation is returned underground. This paper reports the achievements in fiscal 1982. For the simulated return testing equipment, the hot water supply line was changed, a supply line was newly installed for a water flowing test on hot water in the Hacchobara area, flow rate measuring lines for each system were newly installed, and the pressure detecting locations were changed. In the fundamental tests on the simulated return test, experimental researches were carried out on the following items: production of silica scale from geothermal water, solubility of silica acid, effect of pH on polymerization of silica acid, induction time in the polymerization process of silica acid, sizes of poly-silica acid particles in geothermal water, production of poly-silica acid due to temperature drop, oversaturation degree of mono-silica acid, and scale deposition. In the simulated return test, temperature of a simulated column reproducing the return ground bed, particle sizes, and hot water properties were used as the parameters for the test conducted. As a result, the decay in return wells was estimated to be governed predominantly by chemical deposition of the scales. (NEDO)

  9. The International intraval project. Phase 1 test cases

    International Nuclear Information System (INIS)

    1992-01-01

    This report contains a description of the test cases adopted in Phase 1 of the international cooperation project INTRAVAL. Seventeen test cases based on bench-scale experiments in laboratory, field tests and natural analogue studies, have been included in the study. The test cases are described in terms of experimental design and types of available data. In addition, some quantitative examples of available data are given as well as references to more extensive documentation of the experiments on which the test cases are based. Fithteen test cases examples are given: 1 Mass transfer through clay by diffusion and advection. 2 Uranium migration in crystalline bore cores, small scale pressure infiltration experiments. 3 Radionuclide migration in single natural fractures in granite. 4 Tracer tests in a deep basalt flow top. 5 Flow and tracer experiment in crystalline rock based on the Stripa 3-D experiment. 6 Tracer experiment in a fracture zone at the Finnsjon research area. 7 Synthetic data base, based on single fracture migration experiments in Grimsel rock laboratory. 8 Natural analogue studies at Pocos de Caldas, Minais Gerais, Brazil. Redox-front and radionuclide movement in an open pit uranium mine. 9 Natural analogue studies at the Koongarra site in the Alligator Rivers area of the Northern Territory, Australia. 10 Large block migration experiments in a block of crystalline rock. 11 Unsaturated flow and transport experiments performed at Las Cruces, New Mexico. 12 Flow and transport experiment in unsaturated fractured rock performed at the Apache Leap Tuff site, Arizona. 13 Experiments in partially saturated tuffaceous rocks performed in the G-tunnel underground facility at the Nevada Test site, USA. 14 Experimental study of brine transport in porous media. 15 Groundwater flow in the vicinity of the Gorleben Salt Dome, Federal Republic of Germany

  10. Validation of the Arabic Version of the Group Personality Projective Test among university students in Bahrain.

    Science.gov (United States)

    Al-Musawi, Nu'man M

    2003-04-01

    Using confirmatory factor analytic techniques on data generated from 200 students enrolled at the University of Bahrain, we obtained some construct validity and reliability data for the Arabic Version of the 1961 Group Personality Projective Test by Cassel and Khan. In contrast to the 5-factor model proposed for the Group Personality Projective Test, a 6-factor solution appeared justified for the Arabic Version of this test, suggesting some variance between the cultural groups in the United States and in Bahrain.

  11. Transitioning the GED[R] Mathematics Test to Computer with and without Accommodations: A Pilot Project

    Science.gov (United States)

    Patterson, Margaret Becker; Higgins, Jennifer; Bozman, Martha; Katz, Michael

    2011-01-01

    We conducted a pilot study to see how the GED Mathematics Test could be administered on computer with embedded accessibility tools. We examined test scores and test-taker experience. Nineteen GED test centers across five states and 216 randomly assigned GED Tests candidates participated in the project. GED candidates completed two GED mathematics…

  12. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  13. Developing a reproducible non-line-of-sight experimental setup for testing wireless medical device coexistence utilizing ZigBee.

    Science.gov (United States)

    LaSorte, Nickolas J; Rajab, Samer A; Refai, Hazem H

    2012-11-01

    The integration of heterogeneous wireless technologies is believed to aid revolutionary healthcare delivery in hospitals and residential care. Wireless medical device coexistence is a growing concern given the ubiquity of wireless technology. In spite of this, a consensus standard that addresses risks associated with wireless heterogeneous networks has not been adopted. This paper serves as a starting point by recommending a practice for assessing the coexistence of a wireless medical device in a non-line-of-sight environment utilizing 802.15.4 in a practical, versatile, and reproducible test setup. This paper provides an extensive survey of other coexistence studies concerning 802.15.4 and 802.11 and reports on the authors' coexistence testing inside and outside an anechoic chamber. Results are compared against a non-line-of-sight test setup. Findings relative to co-channel and adjacent channel interference were consistent with results reported in the literature.

  14. United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

    Energy Technology Data Exchange (ETDEWEB)

    Hack, Horst [Electric Power Research Institute (EPRI); Purgert, Robert Michael [Energy Industries of Ohio

    2017-12-13

    Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO2 emissions, compared to CO2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760

  15. LINES

    Directory of Open Access Journals (Sweden)

    Minas Bakalchev

    2015-10-01

    Full Text Available The perception of elements in a system often creates their interdependence, interconditionality, and suppression. The lines from a basic geometrical element have become the model of a reductive world based on isolation according to certain criteria such as function, structure, and social organization. Their traces are experienced in the contemporary world as fragments or ruins of a system of domination of an assumed hierarchical unity. How can one release oneself from such dependence or determinism? How can the lines become less “systematic” and forms more autonomous, and less reductive? How is a form released from modernistic determinism on the new controversial ground? How can these elements or forms of representation become forms of action in the present complex world? In this paper, the meaning of lines through the ideas of Le Corbusier, Leonidov, Picasso, and Hitchcock is presented. Spatial research was made through a series of examples arising from the projects of the architectural studio “Residential Transformations”, which was a backbone for mapping the possibilities ranging from playfulness to exactness, as tactics of transformation in the different contexts of the contemporary world.

  16. Reconstruction of railway energy lines; Rekonstruktion von Bahnenergieleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Rothe, Matthias [DB Energie Gmbh, Berlin (Germany); Wahlen, Manfred [DB Energie Gmbh, Koeln (Germany)

    2013-06-15

    As is the case for other overhead lines, 110 kV railway energy lines are assumed to have a service life of 80 years. When this service life ends or the lines are adapted to the state of the art as necessary, all components of the overhead line are renewed. For the reconstruction of railway energy lines, the specifications laid down in planning and environmental laws, operational management aspects and the local ambient and development situation are decisive project planning parameters. (orig.)

  17. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  18. Fatigue Tests on Welded Joints Improved by Grinding

    DEFF Research Database (Denmark)

    Agerskov, Henning; Bjørnbak-Hansen, Jørgen; Olesen, John Forbes

    The present project is a part of an investigation on the fatigue life of the welded structure of large two-stroke diesel engines. Of special interest has been a study of the improvement in fatigue life, due to grinding of the weld toes. The test series carried through showed a significant increase...... without grinding to approx. 6.4 for the test series with grinding. In one of the test series (No. 7), the crack initiation in most tests moved from the weld toe to the non-ground surface between the ground areas at the weld toes, due to the grinding....... in fatigue life due to the grinding, ranging from a factor of approx. 2.8 to infinity, depending on the load level. With the limited number of tests carried out, S-N lines have not been determined. However, the results obtained indicate a change in slope of the S-N line from approx. 3.0 for the test series...

  19. Extruded Tunnel Lining System : Phase 1. Conceptual Design and Feasibility Testing.

    Science.gov (United States)

    1979-09-01

    The Extruded Tunnel Lining System (ETLS) has been conceived as a means of continuously placing the final concrete tunnel lining directly behind a tunnel boring machine. The system will shorten the time required to excavate and line a tunnel section, ...

  20. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  1. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  2. On-line monitoring for calibration reduction

    International Nuclear Information System (INIS)

    Hoffmann, Mario; Gran, Frauke Schmitt; Thunem, Harald P-J.

    2004-04-01

    On-Line Monitoring (OLM) of a channel's calibration state evaluates instrument channel performance by assessing its consistency with other plant indications. Industry and experience at several plants has shown this overall approach to be very effective in identifying instrument channels that are exhibiting degrading or inconsistent performance characteristics. The Halden Reactor Project has developed the signal validation system PEANO, which can be used to assist with the tasks of OLM. To further enhance the PEANO System for use as a calibration reduction tool, the following two additional modules have been developed; HRP Prox, which performs pre-processing and statistical analysis of signal data, Batch Monitoring Module (BMM), which is an off-line batch monitoring and reporting suite. The purpose and functionality of the HRP Prox and BMM modules are discussed in this report, as well as the improvements made to the PEANO Server to support these new modules. The Halden Reactor Project has established a Halden On-Line Monitoring User Group (HOLMUG), devoted to the discussion and implementation of on-line monitoring techniques in power plants. It is formed by utilities, vendors, regulatory bodies and research institutes that meet regularly to discuss implementation aspects of on-line monitoring, technical specification changes, cost-benefit analysis and regulatory issues. (Author)

  3. Delivering below the line in project management – A conceptual exploration

    Directory of Open Access Journals (Sweden)

    Udechukwu Ojiako

    2013-06-01

    Design/Methodology/Approach: The study is conceptual in nature and draws upon literature on complexity theory, expectations theories and stakeholder theory. Findings: The paper finds that there is a need to articulate a different assessment of project outcomes than has been traditionally undertaken. Such assessments may emphasise the perceptions of project clients formed through their experience of projects throughout the project lifecycle. Implications: This paper raises questions on whether the outcomes of projects are best ‘measured’ or ‘assessed’.

  4. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1994-01-01

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area)

  5. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  6. Implementation and Test of On-line Embedded Grid Impedance Estimation for PV-inverters

    DEFF Research Database (Denmark)

    Asiminoaei, Lucian; Teodorescu, Remus; Blaabjerg, Frede

    2004-01-01

    to evaluate the grid impedance directly by the PV-inverter, providing a fast and low cost implementation. This principle theoretically provides a correct result of the grid impedance but when using it into the context of PV integration, different implementation issues strongly affect the quality...... of the results. This paper presents a new impedance estimation method including typical implementation problems encountered and it also presents adopted solutions for on-line grid impedance measurement. Practical tests on an existing PV-inverter validate the chosen solutions....

  7. Eliminating harmonics in line to line voltage using genetic algorithm using multilevel inverter

    Energy Technology Data Exchange (ETDEWEB)

    Gunasekaran, R. [Excel College of Engineering and Technology, Komarapalayam (India). Electrical and Electronics Engineering; Karthikeyan, C. [K.S. Rangasamy College of Engineering, Tamil Nadu (India). Electrical and Electronics Engineering

    2017-04-15

    In this project the total harmonic distortion (THD) minimization of the multilevel inverters output voltage is discussed. The approach in reducing harmonics contents in inverters output voltage is THD elimination. The switching angles are varied with the fundamental frequency so the output THD is minimized. In three phase applications, the line voltage harmonics are of the main concern from the load point of view. Using a genetic algorithm, a THD minimization process is directly applied to the line to line voltage of the inverter. Genetic (GA) algorithm allows the determination of the optimized parameters and consequently an optimal operating point of the circuit and a wide pass band with a unity gain is obtained.

  8. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  9. In-line phase contrast micro-CT reconstruction for biomedical specimens.

    Science.gov (United States)

    Fu, Jian; Tan, Renbo

    2014-01-01

    X-ray phase contrast micro computed tomography (micro-CT) can non-destructively provide the internal structure information of soft tissues and low atomic number materials. It has become an invaluable analysis tool for biomedical specimens. Here an in-line phase contrast micro-CT reconstruction technique is reported, which consists of a projection extraction method and the conventional filter back-projection (FBP) reconstruction algorithm. The projection extraction is implemented by applying the Fourier transform to the forward projections of in-line phase contrast micro-CT. This work comprises a numerical study of the method and its experimental verification using a biomedical specimen dataset measured at an X-ray tube source micro-CT setup. The numerical and experimental results demonstrate that the presented technique can improve the imaging contrast of biomedical specimens. It will be of interest for a wide range of in-line phase contrast micro-CT applications in medicine and biology.

  10. Design and simulation of the rotating test rig in the INDUFLAP project

    DEFF Research Database (Denmark)

    Barlas, Thanasis K.; Aagaard Madsen, Helge; Løgstrup Andersen, Tom

    The general description and objectives of the rotating test rig at the Risø campus of DTU are presented, as used for the aeroelastic testing of a controllable rubber trailing edge flap (CRTEF) system in the INDUFLAP project. The design of all new components is presented, including the electrical...... drive, the pitch system, the boom, and the wing/flap section. The overall instrumentation of the components used for the aeroelastic testing is described. Moreover, the aeroelastic model simulating the setup is described, and predictions of steady and dynamic loading along with the aeroelastic analysis...

  11. Overview and Example Test Results of Modern Pilot Schemes for Coordination of Line Distance Protection Relays

    Directory of Open Access Journals (Sweden)

    Emil Bartosiewicz

    2014-03-01

    Full Text Available The paper presents a short review of pilot schemes which are available in modern line distance protection relays, and example results of common pilot scheme tests with the testing methods description. Some differences in implementations of selected pilot schemes have been shown for comparison reasons. Distance protection coordination functions have been tested for GE Multilin UR series devices. Every type of available pilot scheme has been checked in synthetic tests and during the real coordination between D60 and D90Plus devices. For the POTT scheme, coordination between two L90 protections has been carried out by a sort of available different data communication link types, for comparison reasons too.

  12. Dielectric window development for the ITER ICRF vacuum transmission line

    International Nuclear Information System (INIS)

    Heikinheimo, L.; Heikkinen, J.; Hytoenen, Y.

    1998-08-01

    A vacuum window block design is presented for the ITER (International Thermonuclear Experimental Reactor) ion cyclotron radio frequency heating vacuum transmission line. The vacuum windows in various auxiliaries of the present fusion facilities and in future fusion reactors are essential and most vulnerable components, as they provide ultimate vacuum and tritium containment. Various existing windows, e.g. those at the ASDEX Upgrade tokamak (IPP, Garching), Tore Supra (CEA, Cadarache), and at JET Tokamak (Euratom, Culham), have provided a starting point for the present work, but the large size, remote handling and cooling requirements, as well as the strong neutron radiation in the fusion reactors have called a new design, where new material combinations for the dielectric and conductor have deemed to be necessary. Conventional and well tested design solutions have been chosen wherever possible. A preprototype construction has been launched to test the design principles, in particular the joining of the ceramics to a titanium conductor by brazing which has not been possible so far in this size and geometry. First results of the preprototype tests are reported here. The present final report is a combination of the results achieved with the support of two different projects; an industrial project funded by EFET and a NET Research and Design project funded by the Euratom/TEKES within the Euratom fusion programme. (orig.)

  13. Field pilot testing for chemical oxidation at the former Nitchequon meteorological station : decontamination project in isolated areas

    Energy Technology Data Exchange (ETDEWEB)

    Peisajovich, A. [Transport Canada, Montreal, PQ (Canada); Bergeron, E. [Golder Associates Ltd., Montreal, PQ (Canada); Barbeau, M. [Golder Associates Innovative Applications, Montreal, PQ (Canada); Lajoie, G. [Cree Regional Authority, Montreal, PQ (Canada)

    2006-07-01

    Field pilot testing for chemical oxidation at the former Nitchequon meteorological station was discussed. This presentation described the site location and provided an aerial view and cross section of the site. The historical background and condition of the site were then identified. Photographs and illustrations of the site and the source of the problem were provided. Photographs were also provided of the logistics, temporary camp, dismantling of tanks, equipment, pipeline dismantling, residues, methodology as well as a graphical representation of how to solve the problem. Other topics included technologies tested on site, full-scale remediation plans, remediation goals, step by step process, and costs distribution. Among the steps discussed was: vegetation removal; excavation of the first two feet of soil; transfer of contaminated soil on high-density polyethylene (HDPE) lining prior to treatment; cell construction; cell lining insulation; transfer of treated soil from the mixers to the curing cells; installation of HDPE top cover lining over the treated soil; and the addition of 12 inches of clean soil over the top cover lining. tabs., figs.

  14. LOT Project long term test of buffer material at the Aespoe HRL

    International Nuclear Information System (INIS)

    Karnland, O.; Olsson, S.; Dueck, A.; Birgersson, M.; Nilsson, U.; Hernan-Haakansson, T.; Pedersen, K.; Eriksson, S.; Eriksen, T.; Eriksson, S.; Rosborg, B.; Muurinen, A.; Rousset, D.; Mosser-Ruck, R.; Cathelineau, M.; Villieras, F.; Pelletier, M.; Kaufold, S.; Dohrmann, R.; Fernandez, R.; Maeder, U.; Koroleva, M.

    2010-01-01

    year test parcel (A0). The parcels A0 and A2 are finalized and the basic tests and analyzes are made. The most important general and specific results from the analyzed parcels may be summarized as: - reorganization of easily dissolved accessory minerals e.g. gypsum; - increase in cation exchange capacity in the warm parts of the A2 parcel; - changed rheological properties (reduced strain at failure) in warm sections in parcel A2; - expected diffusive transport of trace elements; - expected corrosion rate of metallic copper; - no or insignificant bacterial activity. The LOT project was initiated and is financed by SKB (Sweden). Posiva have contributed from project start by financing clay water analyses performed by VTT. As from the last analyzed A2 parcel, also ANDRA (France), BGR (Germany) and Nagra (Switzerland) have joined the project by financing parallel independent mineralogical analyses performed by laboratories in these countries, respectively. (authors)

  15. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  16. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  17. The impact of bad fit product line extensions on brand personality

    OpenAIRE

    Lima, Pedro

    2017-01-01

    This work project intended to study the impact of a bad fit product line extension on brand personality. To do that, the focus of the study was narrowed down to one dimension of the brand personality, ruggedness, and another one as a comparative dimension, sophistication. The test consisted in the introduction of a bad fit extension by two brands: Harley-Davidson and Jaguar. The findings show us that a bad fit extension has more impact in the sophistication dimension (increased the dimension ...

  18. Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

    Energy Technology Data Exchange (ETDEWEB)

    Muons, Inc.

    2011-05-19

    This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company's continued success and growth is directly related to our expertise in applying this program to interesting applications.

  19. Second-line failure and first experience with third-line antiretroviral therapy in Mumbai, India

    Directory of Open Access Journals (Sweden)

    Samsuddin Khan

    2014-07-01

    Full Text Available Background: There are limited data on the failure of second-line antiretroviral therapy (ART and the use of third-line ART in people living with HIV in resource-limited settings. Since 2011, the Médecins Sans Frontières (MSF HIV/tuberculosis programme in Mumbai, India, has been providing third-line ART to patients in care. Objective: To describe the experiences and programmatic challenges during management of suspected second-line ART failure and third-line ART therapy for patients living with HIV, including the use of HIV viral load (VL testing. Design: This was a retrospective, observational cohort study of patients with suspected second-line ART treatment failure, who were followed for at least 12 months between January 2011 and March 2014. Results: A total of 47 patients with suspected second-line failure met the inclusion criteria during the study period. Twenty-nine of them (62% responded to enhanced adherence support, had a subsequent undetectable VL after a median duration of 3 months and remained on second-line ART. The other 18 patients had to be initiated on a third-line ART regimen, which consisted of darunavir–ritonavir, raltegravir, and one or more appropriate nucleoside or nucleotide reverse transcriptase inhibitors, based on the results of HIV genotype testing. Of the 13 patients for whom follow-up VL results were available, 11 achieved virological suppression after a median duration of 3 months on third-line ART (interquartile range: 2.5–3.0. No serious treatment-related adverse events were recorded. Conclusions: With intensive counselling and adherence support in those suspected of failing second-line ART, unnecessary switching to more expensive third-line ART can be averted in the majority of cases. However, there is an increasing need for access to third-line ART medications such as darunavir and raltegravir, for which national ART programmes should be prepared. The cost of such medications and inadequate access to VL

  20. Cost-effectiveness of HIV drug resistance testing to inform switching to second line antiretroviral therapy in low income settings

    DEFF Research Database (Denmark)

    Phillips, Andrew; Cambiano, Valentina; Nakagawa, Fumiyo

    2014-01-01

    BACKGROUND: To guide future need for cheap resistance tests for use in low income settings, we assessed cost-effectiveness of drug resistance testing as part of monitoring of people on first line ART - with switching from first to second line ART being conditional on NNRTI drug resistance mutations...... being identified. METHODS: An individual level simulation model of HIV transmission, progression and the effect of ART which accounts for adherence and resistance development was used to compare outcomes of various potential monitoring strategies in a typical low income setting in sub-Saharan Africa....... Underlying monitoring strategies considered were based on clinical disease, CD4 count or viral load. Within each we considered a strategy in which no further measures are performed, one with a viral load measure to confirm failure, and one with both a viral load measure and a resistance test. Predicted...

  1. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    International Nuclear Information System (INIS)

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project

  2. Instrumentation, Field Network And Process Automation for the LHC Cryogenic Line Tests

    CERN Document Server

    Bager, T; Bertrand, G; Casas-Cubillos, J; Gomes, P; Parente, C; Riddone, G; Suraci, A

    2000-01-01

    This paper describes the cryogenic control system and associated instrumentation of the test facility for 3 pre-series units of the LHC Cryogenic Distribution Line. For each unit, the process automation is based on a Programmable Logic Con-troller implementing more than 30 closed control loops and handling alarms, in-terlocks and overall process management. More than 160 sensors and actuators are distributed over 150 m on a Profibus DP/PA network. Parameterization, cali-bration and diagnosis are remotely available through the bus. Considering the diversity, amount and geographical distribution of the instru-mentation involved, this is a representative approach to the cryogenic control system for CERN's next accelerator.

  3. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  4. California-Oregon 500-kV transmission line development of design criteria

    International Nuclear Information System (INIS)

    Simpson, K.D.

    1990-01-01

    The California-Oregon Transmission Project (COTP) encompassed the design and construction of a third 500-kV ac intertie between California and the Pacific Northwest Transmission system. Sargent ampersand Lundy's (S ampersand L) scope of work in the COTP includes the design of approximately 150 miles of new single-circuit, 500-kV transmission line from southern Oregon to the vicinity of Redding, California. This paper presents the development of the design criteria for this segment of the project, which crosses diverse topographic and climatic regions. This project is an example of the increasing utilization of computers in transmission line engineering. Almost all aspects of design involved the use of the computer. Also, the development of the design criteria for this project coincided with an early release of the TLWorkstation software package by EPRI. TLWorkstation is an engineering workstation containing a family of programs for various aspects of transmission line design. This engineering software allows for increasing refinement in the design and economic optimization of transmission lines and is becoming an important design tool for transmission engineers

  5. Fuel integrity project: analysis of light water reactor fuel rods test results

    International Nuclear Information System (INIS)

    Dallongeville, M.; Werle, J.; McCreesh, G.

    2004-01-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  6. Fuel integrity project: analysis of light water reactor fuel rods test results

    Energy Technology Data Exchange (ETDEWEB)

    Dallongeville, M.; Werle, J. [COGEMA Logistics (AREVA Group) (France); McCreesh, G. [BNFL Nuclear Sciences and Technology Services (United Kingdom)

    2004-07-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  7. 40 CFR 1051.325 - What happens if an engine family fails the production-line testing requirements?

    Science.gov (United States)

    2010-07-01

    ... ENGINES AND VEHICLES Testing Production-Line Vehicles and Engines § 1051.325 What happens if an engine... for an engine family if it fails under § 1051.315. The suspension may apply to all facilities producing vehicles or engines from an engine family, even if you find noncompliant vehicles or engines only...

  8. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  9. In line inspection of multi-diameter and high-pressure pipelines in Brazil using combined technologies: magnetic flux leakage and ultrasonic testing

    Energy Technology Data Exchange (ETDEWEB)

    Ginten, Markus; Brockhaus, Stephan; Bouaoua, Nourreddine; Klein, Stefan [ROSEN Technology and Research Center, Lingen (Germany); Bruening, Franz [ROSEN Brazil, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The simultaneous use of the magnetic flux leakage (MFL) method and the ultrasonic testing (UT) method on a single in line inspection (ILI) tool has been identified as a versatile and accurate solution for liquid pipelines. The combination of the two methods is complementary to the restrictions of each other. Also, the overall scope of the inspection is enlarged. General wall thinning and largely corroded areas are accurately and reliably scanned with the UT unit, while very detailed information about pitting corrosion is obtained from the MFL measurement. Blind spots of echo loss, as occasionally observed for the UT channels is compensated by the more robust measurement from the MFL sensors. Consequently, this technology has been the method of choice in an in line inspection project of an onshore long distance pipeline in Brazil, facing a variety of corrosion threats. The pipeline consists of several multi-diameter sections of 18/20 inches and 20/22 inches. Furthermore, the high gravity of product in combination with a height profile, an altitude of 1152 m MSL (Mean Sea Level) had to be crossed, leads to a maximum pressure of 220 bar. These boundary conditions had to be considered during the design of the ILI-tool. The paper discusses the experience made so far with the combined technology MFL and UT. The effective use of the inspection tool for the above mentioned pipeline as well as field results from a previous inspection are described. (author)

  10. Antimutagenic, Antirecombinogenic, and Antitumor Effect of Amygdalin in a Yeast Cell-Based Test and Mammalian Cell Lines.

    Science.gov (United States)

    Todorova, Atanaska; Pesheva, Margarita; Iliev, Ivan; Bardarov, Krum; Todorova, Teodora

    2017-04-01

    Amygdalin is a major component of the seeds of Rosaceae family of plants such as apricots, peaches, cherry, nectarines, apples, plums, and so on, as well as almonds. It is used in alternative medicine for cancer prevention, alleviation of fever, cough suppression, and quenching thirst. The aim of the present study is to determine the mutagenic and recombinogenic effects of amygdalin in a test system Saccharomyces cerevisiae and to evaluate its potential antitumor effect in a yeast cell-based test and colon cancer cell lines. Results obtained show that concentrations 25, 50, and 100 μg/mL did not have any cytotoxic, mutagenic, and carcinogenic effect in yeast cell-based tests. Pretreatment with amygdalin at concentration 100 μg/mL leads to around twofold of the cell survival and decrease of reverse mutation frequency, induced by the alkylating agent methyl methanesulfonate. The frequency of gene conversion and mitotic crossing-over is around threefold lower. The anticarcinogenic potential of amygdalin at the same concentration is presented as around fourfold reduction of Ty1 retrotransposition induced by hexavalent chromium. In summary, data presented in this study provide evidence concerning the inability of amygdalin itself to provoke events related to the initial steps of tumorigenesis. In addition, the observed antimutagenic/antirecombinogenic effect could be activation of error-free and error-prone recombination events. Based on the high selectivity toward normal or tumor cell lines, it could be speculated that amygdalin has higher cytotoxic effect in cell lines with higher proliferative and metabolic activity, which are the majority of fast developing tumors.

  11. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  12. An overview of the fuels and materials testing programme at the OECD Halden Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiesenack, W [Institutt for Energiteknikk, Halden (Norway). OECD Halden Reaktor Projekt

    1997-08-01

    The fuels and materials testing programme of the OECD Halden Reactor Project is aimed at investigations of fuel and cladding properties at high burnup, water chemistry effects and in-core materials ageing problems. For the execution of this programme, different types of irradiation rigs and experimental facilities providing typical power reactors conditions are available. Data are obtained from in-core sensors developed at the Halden Project; these are shortly described. An overview of the current test programme and the scope of the following years are briefly presented. (author). 5 refs, 3 figs.

  13. North Central Transmission Line: Guidelines for the environmental impact statement

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines that Manitoba Hydro must follow in the preparation of the environmental impact statement on the proposed North Central Transmission Line (TCTL) project are presented. The project consists of a 138 kV transmission line, two 25 kV distribution lines, and related ancillary structures and facilities. The review process must be sensitive to cultural and community needs and must involve those most directly affected, and should be grounded in the impacted northern communities. The review should include a project background, the proposal, a description of the existing natural and socio-economic environment, and must address employment, education and training, impacts on renewable resource harvesting, environmental impacts, social impacts and economic impacts, legal/jurisdictional issues, infrastructure, mitigation and compensation, and environmental monitoring and follow-up. 1 fig., 20 tabs

  14. Summary of the First High-Altitude, Supersonic Flight Dynamics Test for the Low-Density Supersonic Decelerator Project

    Science.gov (United States)

    Clark, Ian G.; Adler, Mark; Manning, Rob

    2015-01-01

    NASA's Low-Density Supersonic Decelerator Project is developing and testing the next generation of supersonic aerodynamic decelerators for planetary entry. A key element of that development is the testing of full-scale articles in conditions relevant to their intended use, primarily the tenuous Mars atmosphere. To achieve this testing, the LDSD project developed a test architecture similar to that used by the Viking Project in the early 1970's for the qualification of their supersonic parachute. A large, helium filled scientific balloon is used to hoist a 4.7 m blunt body test vehicle to an altitude of approximately 32 kilometers. The test vehicle is released from the balloon, spun up for gyroscopic stability, and accelerated to over four times the speed of sound and an altitude of 50 kilometers using a large solid rocket motor. Once at those conditions, the vehicle is despun and the test period begins. The first flight of this architecture occurred on June 28th of 2014. Though primarily a shake out flight of the new test system, the flight was also able to achieve an early test of two of the LDSD technologies, a large 6 m diameter Supersonic Inflatable Aerodynamic Decelerator (SIAD) and a large, 30.5 m nominal diameter supersonic parachute. This paper summarizes this first flight.

  15. New measurement system for on line in core high-energy neutron flux monitoring in materials testing reactor conditions

    International Nuclear Information System (INIS)

    Geslot, B.; Filliatre, P.; Barbot, L.; Jammes, C.; Breaud, S.; Oriol, L.; Villard, J.-F.; Vermeeren, L.; Lopez, A. Legrand

    2011-01-01

    Flux monitoring is of great interest for experimental studies in material testing reactors. Nowadays, only the thermal neutron flux can be monitored on line, e.g., using fission chambers or self-powered neutron detectors. In the framework of the Joint Instrumentation Laboratory between SCK-CEN and CEA, we have developed a fast neutron detector system (FNDS) capable of measuring on line the local high-energy neutron flux in fission reactor core and reflector locations. FNDS is based on fission chambers measurements in Campbelling mode. The system consists of two detectors, one detector being mainly sensitive to fast neutrons and the other one to thermal neutrons. On line data processing uses the CEA depletion code DARWIN in order to disentangle fast and thermal neutrons components, taking into account the isotopic evolution of the fissile deposit. The first results of FNDS experimental test in the BR2 reactor are presented in this paper. Several fission chambers have been irradiated up to a fluence of about 7 x 10 20 n/cm 2 . A good agreement (less than 10% discrepancy) was observed between FNDS fast flux estimation and reference flux measurement.

  16. New measurement system for on line in core high-energy neutron flux monitoring in materials testing reactor conditions

    Science.gov (United States)

    Geslot, B.; Vermeeren, L.; Filliatre, P.; Lopez, A. Legrand; Barbot, L.; Jammes, C.; Bréaud, S.; Oriol, L.; Villard, J.-F.

    2011-03-01

    Flux monitoring is of great interest for experimental studies in material testing reactors. Nowadays, only the thermal neutron flux can be monitored on line, e.g., using fission chambers or self-powered neutron detectors. In the framework of the Joint Instrumentation Laboratory between SCK-CEN and CEA, we have developed a fast neutron detector system (FNDS) capable of measuring on line the local high-energy neutron flux in fission reactor core and reflector locations. FNDS is based on fission chambers measurements in Campbelling mode. The system consists of two detectors, one detector being mainly sensitive to fast neutrons and the other one to thermal neutrons. On line data processing uses the CEA depletion code DARWIN in order to disentangle fast and thermal neutrons components, taking into account the isotopic evolution of the fissile deposit. The first results of FNDS experimental test in the BR2 reactor are presented in this paper. Several fission chambers have been irradiated up to a fluence of about 7 × 1020 n/cm2. A good agreement (less than 10% discrepancy) was observed between FNDS fast flux estimation and reference flux measurement.

  17. New measurement system for on line in core high-energy neutron flux monitoring in materials testing reactor conditions

    Energy Technology Data Exchange (ETDEWEB)

    Geslot, B.; Filliatre, P.; Barbot, L.; Jammes, C.; Breaud, S.; Oriol, L.; Villard, J.-F. [CEA, DEN, Cadarache, SPEx/LDCI, F-13108 Saint-Paul-lez-Durance (France); Vermeeren, L. [SCK-CEN, Boeretang 200, B-2400 Mol (Belgium); Lopez, A. Legrand [CEA, DEN, Saclay, SIREN/LECSI, F-91400 Saclay (France)

    2011-03-15

    Flux monitoring is of great interest for experimental studies in material testing reactors. Nowadays, only the thermal neutron flux can be monitored on line, e.g., using fission chambers or self-powered neutron detectors. In the framework of the Joint Instrumentation Laboratory between SCK-CEN and CEA, we have developed a fast neutron detector system (FNDS) capable of measuring on line the local high-energy neutron flux in fission reactor core and reflector locations. FNDS is based on fission chambers measurements in Campbelling mode. The system consists of two detectors, one detector being mainly sensitive to fast neutrons and the other one to thermal neutrons. On line data processing uses the CEA depletion code DARWIN in order to disentangle fast and thermal neutrons components, taking into account the isotopic evolution of the fissile deposit. The first results of FNDS experimental test in the BR2 reactor are presented in this paper. Several fission chambers have been irradiated up to a fluence of about 7 x 10{sup 20} n/cm{sup 2}. A good agreement (less than 10% discrepancy) was observed between FNDS fast flux estimation and reference flux measurement.

  18. Multiple Lines Of Evidence Supporting Natural Attenuation: Lines Of Inquiry Supporting Monitored Natural Attenuation And Enhanced Attenuatin Of Chlorinated Solvents

    Energy Technology Data Exchange (ETDEWEB)

    Vangelas, Karen; Widemeirer, T. H.; Barden, M.J.; Dickson, W. Z.; Major, David

    2004-12-31

    The Department of Energy (DOE) is sponsoring an initiative to facilitate efficient, effective and responsible use of Monitored Natural Attenuation (MNA) and Enhanced Attenuation (EA) for chlorinated solvents. This Office of Environmental Management (EM) ''Alternative Project,'' focuses on providing scientific and policy support for MNA/EA. A broadly representative working group of scientists supports the project along with partnerships with regulatory organizations such as the Interstate Technology Regulatory Council (ITRC) and the United States Environmental Protection Agency (USEPA). The initial product of the technical working group was a summary report that articulated the conceptual approach and central scientific tenants of the project, and that identified a prioritized listing of technical targets for field research. This report documented the process in which: (1) scientific ground rules were developed, (2) lines of inquiry were identified and then critically evaluated, (3) promising applied research topics were highlighted in the various lines of inquiry, and (4) these were discussed and prioritized. The summary report will serve as a resource to guide management and decision making throughout the period of the subject MNA/EA Alternative Project. To support and more fully document the information presented in the summary report, the DOE is publishing a series of supplemental documents that present the full texts from the technical analyses within the various lines of inquiry (see listing). The following report--documenting our evaluation of the state of the science for the lines of evidence for supporting decision-making for MNA--is one of those supplemental documents.

  19. Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

    Science.gov (United States)

    Valkov, Steffi B.; Sternberg, Daniel; Marston, Michael

    2018-01-01

    The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries.

  20. Developing Green Line Products

    DEFF Research Database (Denmark)

    Muñoz-Marin, Ana Maria; Lassen, Astrid Heidemann; Poulsen, Søren Bolvig

    2011-01-01

    This publication is based on the Master thesis “User-driven ecoinnovation process: Towards the implementation of the Green product line at JELD-WEN” written by Ana Maria Muñoz-Marin as her Graduation Project for the MSc. Global Innovation Management degree. The company-based experiment was carried...

  1. Results of single borehole hydraulic tests in the Mizunami Underground Research Laboratory project. FY 2012 - FY 2015

    International Nuclear Information System (INIS)

    Onoe, Hironori; Takeuchi, Ryuji

    2016-11-01

    This report summarize the results of the single borehole hydraulic tests of 151 sections carried out at the -300 m Stage and the -500 m Stage of the Mizunami Underground Research Laboratory from FY 2012 to FY 2015. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical methods used are presented in this report. Furthermore, the previous results of the single borehole hydraulic tests carried out in the Regional Hydrogeological Study Project and the Mizunami Underground Research Laboratory Project before FY 2012 are also summarized in this report. (author)

  2. Testing, comparison, further development and assessment of genotoxicity tests for surface water. Findings of a BMBF study; Erprobung, Vergleich, Weiterentwicklung und Beurteilung von Gentoxizitaetstests fuer Oberflaechenwasser. Ergebnisse eines BMBF-Verbundvorhabens

    Energy Technology Data Exchange (ETDEWEB)

    Grummt, T. [Umweltbundesamt, Bad Elster (Germany)

    2001-05-01

    A research project was designed to develop a test strategy for the detection and evaluation of genotoxic effects in surface water aquatic organisms. Indicator tests were evaluated with respect to their predictive power, sensitivity and practicability in order to determine whether they are suitable for inclusion in a battery of tests. The bioassays utilized in this study include the umu-test, alkaline filter elution (mussels, green algae), the DNA unwinding test (fish larvae, cray fish, mussels, fish cell lines), the comet assay (protozoans, green algae, mussels, primary fish hepatocytes, fish and mammalian cell lines) and the UDS-test (primary fish hepatocytes). The Ames Salmonella assay, a direct genotoxicity assay and a well-known base test in chemicals assessment, was included in the study programme for comparison. All test results were verified with statistical methods. During the first phase of the project five known genotoxic substances (2-acetylamidofluorene, benzo(a)pyrene, N-nitrosodimethylamine, nitrofurantoin, 4-nitroquinoin-N-oxide) were tested to establish and optimize the assays. In a second phase of the project the validated methods were applied to non-concentrated samples of surface water taken on a monthly basis from the river Rhine, the Wahnbach dam, the rivers Elbe and Mulde over a period of 12 months. The data obtained showed the comet assay, the umu-test and the Ames-test to be particularly sensitive and to detect genotoxic effects in complex mixtures in a low dose range. They seem to be suitable for routine testing and should therefore be used in the first stage of a graduated testing battery for detection of genotoxicity in surface water in combination with effect-oriented chemical analysis. (orig.)

  3. Developing a survey to collect expertise in agile product line requirements engineering processes

    OpenAIRE

    Feng, Kunwu; Lempert, Meli; Tang, Yan; Tian, Kun; Cooper, Kendra M.L.; Franch Gutiérrez, Javier

    2007-01-01

    Current agile methods are focused on practices of small, rapid developing and iteration, more people oriented, less documentation projects, and the use of the methods in large, product line projects are somehow difficult. UTD and GESSI have started a project to develop an expert system that can assist a requirements enginer in selecting a requirements engineering process that is well suited for their project, in particular with respect to the use of agile and product line engineering methods....

  4. The Bears Family Projective Test: evaluating stories of children with emotional difficulties.

    Science.gov (United States)

    Iandolo, Giuseppe; Esposito, Gianluca; Venuti, Paola

    2012-06-01

    The aim of this study was to describe and analyze the storytelling of children with emotional difficulties. Forty children with emotional and relational difficulties (inhibited and impulsive), ages between 5.5 and 9.4 years old, were assessed by a multiaxial procedure and the bears family projective test. The bears family test is a constructive-thematic-projective method based on an anthropomorphic family of bears that children can manipulate to tell a story. The stories of 40 children without emotional difficulties (matched by IQ, socio-economic status, and gender) and 322 typically developing children, aged between four and 10 years old, were used as a reference for comparisons. Results indicated that the stories of children with emotional difficulties showed many unsolved problematic events, unclear characters, negative relationships, and negative behaviors. Unlike the stories of children without emotional difficulties, positive contents didn't prevail over negative, and there wasn't a positive compensation for negative elements.

  5. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  6. Observation and analysis of self-amplified spontaneous emission at the APS low-energy undulator test line

    Science.gov (United States)

    Arnold, N. D.; Attig, J.; Banks, G.; Bechtold, R.; Beczek, K.; Benson, C.; Berg, S.; Berg, W.; Biedron, S. G.; Biggs, J. A.; Borland, M.; Boerste, K.; Bosek, M.; Brzowski, W. R.; Budz, J.; Carwardine, J. A.; Castro, P.; Chae, Y.-C.; Christensen, S.; Clark, C.; Conde, M.; Crosbie, E. A.; Decker, G. A.; Dejus, R. J.; DeLeon, H.; Den Hartog, P. K.; Deriy, B. N.; Dohan, D.; Dombrowski, P.; Donkers, D.; Doose, C. L.; Dortwegt, R. J.; Edwards, G. A.; Eidelman, Y.; Erdmann, M. J.; Error, J.; Ferry, R.; Flood, R.; Forrestal, J.; Freund, H.; Friedsam, H.; Gagliano, J.; Gai, W.; Galayda, J. N.; Gerig, R.; Gilmore, R. L.; Gluskin, E.; Goeppner, G. A.; Goetzen, J.; Gold, C.; Gorski, A. J.; Grelick, A. E.; Hahne, M. W.; Hanuska, S.; Harkay, K. C.; Harris, G.; Hillman, A. L.; Hogrefe, R.; Hoyt, J.; Huang, Z.; Jagger, J. M.; Jansma, W. G.; Jaski, M.; Jones, S. J.; Keane, R. T.; Kelly, A. L.; Keyser, C.; Kim, K.-J.; Kim, S. H.; Kirshenbaum, M.; Klick, J. H.; Knoerzer, K.; Koldenhoven, R. J.; Knott, M.; Labuda, S.; Laird, R.; Lang, J.; Lenkszus, F.; Lessner, E. S.; Lewellen, J. W.; Li, Y.; Lill, R. M.; Lumpkin, A. H.; Makarov, O. A.; Markovich, G. M.; McDowell, M.; McDowell, W. P.; McNamara, P. E.; Meier, T.; Meyer, D.; Michalek, W.; Milton, S. V.; Moe, H.; Moog, E. R.; Morrison, L.; Nassiri, A.; Noonan, J. R.; Otto, R.; Pace, J.; Pasky, S. J.; Penicka, J. M.; Pietryla, A. F.; Pile, G.; Pitts, C.; Power, J.; Powers, T.; Putnam, C. C.; Puttkammer, A. J.; Reigle, D.; Reigle, L.; Ronzhin, D.; Rotela, E. R.; Russell, E. F.; Sajaev, V.; Sarkar, S.; Scapino, J. C.; Schroeder, K.; Seglem, R. A.; Sereno, N. S.; Sharma, S. K.; Sidarous, J. F.; Singh, O.; Smith, T. L.; Soliday, R.; Sprau, G. A.; Stein, S. J.; Stejskal, B.; Svirtun, V.; Teng, L. C.; Theres, E.; Thompson, K.; Tieman, B. J.; Torres, J. A.; Trakhtenberg, E. M.; Travish, G.; Trento, G. F.; Vacca, J.; Vasserman, I. B.; Vinokurov, N. A.; Walters, D. R.; Wang, J.; Wang, X. J.; Warren, J.; Wesling, S.; Weyer, D. L.; Wiemerslage, G.; Wilhelmi, K.; Wright, R.; Wyncott, D.; Xu, S.; Yang, B.-X.; Yoder, W.; Zabel, R. B.

    2001-12-01

    Exponential growth of self-amplified spontaneous emission at 530 nm was first experimentally observed at the Advanced Photon Source low-energy undulator test line in December 1999. Since then, further detailed measurements and analysis of the results have been made. Here, we present the measurements and compare these with calculations based on measured electron beam properties and theoretical expectations.

  7. Observation and analysis of self-amplified spontaneous emission at the APS low-energy undulator test line

    CERN Document Server

    Arnold, N D; Banks, G; Bechtold, R; Beczek, K; Benson, C; Berg, S; Berg, W; Biedron, S G; Biggs, J A; Boerste, K; Borland, M; Bosek, M; Brzowski, W R; Budz, J; Carwardine, J A; Castro, P; Chae, Y C; Christensen, S; Clark, C; Conde, M; Crosbie, E A; Decker, G A; Dejus, Roger J; Deleon, H; Den Hartog, P K; Deriy, B N; Dohan, D; Dombrowski, P; Donkers, D; Doose, C L; Dortwegt, R J; Edwards, G A; Eidelman, Y; Erdmann, M J; Error, J J; Ferry, R; Flood, R; Forrestal, J; Freund, H; Friedsam, H; Gagliano, J; Gai, W; Galayda, J N; Gerig, R; Gilmore, R L; Gluskin, E; Goeppner, G A; Goetzen, J; Gold, C; Grelick, A E; Hahne, M W; Hanuska, S; Harkay, K C; Harris, G; Hillman, A L; Hogrefe, R; Hoyt, J; Huang, Z; Jagger, J M; Jansma, W G; Jaski, M; Jones, S J; Keane, R T; Kelly, A L; Keyser, C; Kim, K J; Kim, S H; Kirshenbaum, M; Klick, J H; Knoerzer, K; Knott, M; Koldenhoven, R J; Labuda, S; Laird, R; Lang, J; Lenkszus, F R; Lessner, E S; Lewellen, J W; Li, Y; Lill, R M; Lumpkin, Alex H; Makarov, O A; Markovich, G M; McDowell, M; McDowell, W P; McNamara, P E; Meier, T; Meyer, D; Michalek, W; Milton, S V; Moe, H; Moog, E; Morrison, L; Nassiri, A; Noonan, J R; Otto, R; Pace, J; Pasky, S J; Penicka, J M; Pietryla, A F; Pile, G; Pitts, C; Power, J; Powers, T; Putnam, C C; Puttkammer, A J; Reigle, D; Reigle, L; Ronzhin, D; Rotela, E R; Russell, E F; Sajaev, Vadim; Sarkar, S; Scapino, J C; Schröder, K; Seglem, R A; Sereno, N S; Sharma, S K; Sidarous, J F; Singh, O; Smith, T L; Soliday, R; Sprau, G A; Stein, S J; Stejskal, B; Svirtun, V; Teng, L C; Theres, E; Thompson, K; Tieman, B J; Torres, J A; Trakhtenberg, E; Travish, G; Trento, G F; Vacca, J; Vasserman, I B; Vinokurov, N A; Walters, D R; Wang, J; Wang, X J; Warren, J; Wesling, S; Weyer, D L; Wiemerslage, G; Wilhelmi, K; Wright, R; Wyncott, D; Xu, S; Yang, B X; Yoder, W; Zabel, R B

    2001-01-01

    Exponential growth of self-amplified spontaneous emission at 530 nm was first experimentally observed at the Advanced Photon Source low-energy undulator test line in December 1999. Since then, further detailed measurements and analysis of the results have been made. Here, we present the measurements and compare these with calculations based on measured electron beam properties and theoretical expectations.

  8. Investigating the application of a nitroreductase-expressing transgenic zebrafish line for high-throughput toxicity testing

    Directory of Open Access Journals (Sweden)

    Anna C. Chlebowski

    Full Text Available Nitroreductase enzymes are responsible for the reduction of nitro functional groups to amino functional groups, and are found in a range of animal models, zebrafish (Danio rerio excluded. Transgenic zebrafish models have been developed for tissue-specific cell ablation, which use nitroreductase to ablate specific tissues or cell types following exposure to the non-toxic pro-drug metronidazole (MTZ. When metabolized by nitroreductase, MTZ produces a potent cytotoxin, which specifically ablates the tissue in which metabolism occurs. Uses, beyond tissue-specific cell ablation, are possible for the hepatocyte-specific Tg(l-fabp:CFP-NTRs891 zebrafish line, including investigations of the role of nitroreductase in the toxicity of nitrated compounds. The hepatic ablation characteristics of this transgenic line were explored, in order to expand its potential uses. Embryos were exposed at 48, 72, or 96 h post fertilization (hpf to a range of MTZ concentrations, and the ablation profiles were compared. Ablation occurred at a 10-fold lower concentration than previously reported. Embryos were exposed to a selection of other compounds, with and without MTZ, in order to investigate alternative uses for this transgenic line. Test compounds were selected based on: their ability to undergo nitroreduction, known importance of hepatic metabolism to toxicity, and known pharmaceutical hepatotoxins. Selected compounds included nitrated polycyclic aromatic hydrocarbons (nitro-PAHs, the PAHs retene and benzo[a]pyrene, and the pharmaceuticals acetaminophen and flutamide. The results suggest a range of potential roles of the liver in the toxicity of these compounds, and highlight the additional uses of this transgenic model in toxicity testing. Keywords: Zebrafish, Transgenic, Nitroreductase, Nitrated polycyclic aromatic hydrocarbon, Tissue ablation, Pharmaceuticals

  9. On-line PWR RHR pump performance testing following motor and impeller replacement

    International Nuclear Information System (INIS)

    DiMarzo, J.T.

    1996-01-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump's 'B' impeller. The spare was installed into the 'B' train. The motor had never been run in the system before. A pump performance test was developed to verify it's operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the 'B' Train showed performance well in excess of the minimum required. The motor that was originally in the 'B' train was similarly overhauled and equipped with 'A' pump's original impeller, re-installed in the 'A' train, and tested. Analysis of the 'A' train results indicate that the RHR pump's performance was also well in excess of the vendors requirements

  10. On-line PWR RHR pump performance testing following motor and impeller replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiMarzo, J.T.

    1996-12-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump`s `B` impeller. The spare was installed into the `B` train. The motor had never been run in the system before. A pump performance test was developed to verify it`s operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the `B` Train showed performance well in excess of the minimum required. The motor that was originally in the `B` train was similarly overhauled and equipped with `A` pump`s original impeller, re-installed in the `A` train, and tested. Analysis of the `A` train results indicate that the RHR pump`s performance was also well in excess of the vendors requirements.

  11. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  12. Test facility for investigation of heating of 30 GHz accelerating structure imitator for the CLIC project

    International Nuclear Information System (INIS)

    Elzhov, A.V.; Ginzburg, N.S.; Kaminsky, A.K.; Kuzikov, S.V.; Perelstein, E.A.; Peskov, N.Yu.; Petelin, M.I.; Sedykh, S.N.; Sergeev, A.P.; Sergeev, A.S.; Syratchev, I.; Zaitsev, N.I.

    2004-01-01

    Since 2001 an experimental test facility for investigation of lifetime of a copper material, with respect to multiple RF pulse actions, was set up on the basis of the JINR (Dubna) FEM oscillator, in collaboration with IAP RAS (Nizhny Novgorod). A high-Q copper cavity, which simulates the parameters of the accelerating structure of the collider CLIC at an operating frequency of 30 GHz, is used in the investigation. The experimental setup consists of a wavebeam injector--FEM oscillator (power of ∼25 MW, pulse duration up to 200 ns, spectral bandwidth not higher than 0.1%), a quasi-optic two-mirror transmission line, a wave-type converter, and a testing cavity. The frequency and transmission features of the components of the quasi-optic line were analyzed

  13. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  14. Projection computation based on pixel in simultaneous algebraic reconstruction technique

    International Nuclear Information System (INIS)

    Wang Xu; Chen Zhiqiang; Xiong Hua; Zhang Li

    2005-01-01

    SART is an important arithmetic of image reconstruction, in which the projection computation takes over half of the reconstruction time. An efficient way to compute projection coefficient matrix together with memory optimization is presented in this paper. Different from normal method, projection lines are located based on every pixel, and the following projection coefficient computation can make use of the results. Correlation of projection lines and pixels can be used to optimize the computation. (authors)

  15. A comparative evaluation of in vitro skin sensitisation tests: the human cell-line activation test (h-CLAT) versus the local lymph node assay (LLNA).

    Science.gov (United States)

    Ashikaga, Takao; Sakaguchi, Hitoshi; Sono, Sakiko; Kosaka, Nanae; Ishikawa, Makie; Nukada, Yuko; Miyazawa, Masaaki; Ito, Yuichi; Nishiyama, Naohiro; Itagaki, Hiroshi

    2010-08-01

    We previously developed the human cell-line activation test (h-CLAT) in vitro skin sensitisation test, based on our reported finding that a 24-hour exposure of THP-1 cells (a human monocytic leukaemia cell line) to sensitisers is sufficient to induce the augmented expression of CD86 and CD54. The aim of this study is to confirm the predictive value of h-CLAT for skin sensitisation activity by employing a larger number of test chemicals. One hundred chemicals were selected, according to their categorisation in the local lymph node assay (LLNA), as being: extreme, strong, moderate and weak sensitisers, and non-sensitisers. The correlation of the h-CLAT results with the LLNA results was 84%. There were some false negatives (e.g. benzoyl peroxide, hexyl cinnamic aldehyde) and some false positives (e.g. 1-bromobutane, diethylphthalate). Eight out of the 9 false negatives (89%) were water-insoluble chemicals. The h-CLAT could positively predict not only extreme and strong sensitisers, but also moderate and weak sensitisers, though the detection rates of weak sensitisers and non-sensitisers were comparatively low. Some sensitisers enhanced both CD86 and CD54 levels, and some enhanced the level of only one of them. The use of the combination of CD86 and CD54 induction as a positive indicator, improved the accuracy of the test. In conclusion, the h-CLAT is expected to be a useful cell-based in vitro method for predicting skin sensitisation potential. 2010 FRAME.

  16. DISAIN SISTEM KENDALI MESIN AIR LEAK TEST MENGGUNAKAN SISTEM KENDALI PLC OMRON CJ2M DI HVAC (HEATING, VENTILATING, AND AIR CONDITIONING LINE 6

    Directory of Open Access Journals (Sweden)

    Syahril Ardi

    2015-03-01

    Full Text Available Pada proses produksi pembuatan komponen HVAC (Heating, Ventilating, and Air Conditioning dari perusahaan manufaktur di Indonesia, memerlukan proses pengecekan kebocoran pada bagian HVAC. Proses pengecekan ini dilakukan untuk memastikan tidak ada komponen HVAC yang bocor sebelum dikirim ke pihak pelanggan. Penelitian ini dilakukan untuk membuat system dan alat air leak test. Mesin air leak test ini menggunakan prinsip kerja differential pressure air leak test, yaitu metode yang membandingkan antara tekanan udara yang diberikan ke produk dan master produk. Pada penelitian ini, kami membuat disain mesin air leak test menggunakan sistem kendali berupa air leak tester, PLC, dan HMI. Berdasarkan kondisi dengan kapasitas produksi yang meningkat karena bertambahnya permintaan dari customer, dapat ditanggulangi dengan adanya share loading produksi dari HVAC line 4 ke line baru, yaitu HVAC line 6. Hasil yang didapat dari pengujian deteksi kebocoran produk,didapat nilai parameter kebocoran produk sebesar 2.23 ml/min.

  17. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  18. Wind-tunnel investigation of aerodynamic efficiency of three planar elliptical wings with curvature of quarter-chord line

    Science.gov (United States)

    Mineck, Raymond E.; Vijgen, Paul M. H. W.

    1993-01-01

    Three planar, untwisted wings with the same elliptical chord distribution but with different curvatures of the quarter-chord line were tested in the Langley 8-Foot Transonic Pressure Tunnel (8-ft TPT) and the Langley 7- by 10-Foot High-Speed Tunnel (7 x 10 HST). A fourth wing with a rectangular planform and the same projected area and span was also tested. Force and moment measurements from the 8-ft TPT tests are presented for Mach numbers from 0.3 to 0.5 and angles of attack from -4 degrees to 7 degrees. Sketches of the oil-flow patterns on the upper surfaces of the wings and some force and moment measurements from the 7 x 10 HST tests are presented at a Mach number of 0.5. Increasing the curvature of the quarter-chord line makes the angle of zero lift more negative but has little effect on the drag coefficient at zero lift. The changes in lift-curve slope and in the Oswald efficiency factor with the change in curvature of the quarter-chord line (wingtip location) indicate that the elliptical wing with the unswept quarter-chord line has the lowest lifting efficiency and the elliptical wing with the unswept trailing edge has the highest lifting efficiency; the crescent-shaped planform wing has an efficiency in between.

  19. Final Technical Report - In-line Uranium Immunosensor

    International Nuclear Information System (INIS)

    Blake, Diane A.

    2006-01-01

    In this project, personnel at Tulane University and Sapidyne Instruments Inc. developed an in-line uranium immunosensor that could be used to determine the efficacy of specific in situ biostimulation approaches. This sensor was designed to operate autonomously over relatively long periods of time (2-10 days) and was able to provide near real-time data about uranium immobilization in the absence of personnel at the site of the biostimulation experiments. An alpha prototype of the in-line immmunosensor was delivered from Sapidyne Instruments to Tulane University in December of 2002 and a beta prototype was delivered in November of 2003. The beta prototype of this instrument (now available commercially from Sapidyne Instruments) was programmed to autonomously dilute standard uranium to final concentrations of 2.5 to 100 nM (0.6 to 24 ppb) in buffer containing a fluorescently labeled anti-uranium antibody and the uranium chelator, 2,9-dicarboxyl-1,10-phenanthroline. The assay limit of detection for hexavalent uranium was 5.8 nM or 1.38 ppb. This limit of detection is well below the drinking water standard of 30 ppb recently promulgated by the EPA. The assay showed excellent precision; the coefficients of variation (CV's) in the linear range of the assay were less than 5% and CV?s never rose above 14%. Analytical recovery in the immunosensors-based assay was assessed by adding variable known quantities of uranium to purified water samples. A quantitative recovery (93.75% - 108.17%) was obtained for sample with concentrations from 7.5 to 20 nM (2-4.75 ppb). In August of 2005 the sensor was transported to Oak Ridge National Laboratory, for testing of water samples at the Criddle test site (see Wu et al., Environ. Sci. Technol. 40:3978-3985 2006 for a description of this site). In this first on-site test, the in-line sensor was able to accurately detect changes in the concentrations of uranium in effluent samples from this site. Although the absolute values for the uranium

  20. Flow lines and export lines of Sabalo Gas Field - the engineering of a complex job; Flow lines e export lines de Sabalo - a engenharia da complexidade

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado Jose Morbach [GDK Engenharia, Salvador, BA (Brazil)

    2003-07-01

    The construction of the natural gas flow lines and export lines system of the Sabalo field, in the far South of Bolivia is an unique job in the pipeline construction area. Its execution is a turning point in terms of engineering and construction technology in this industry. Among the Aguarague Cordillera (mountains), it runs across rocky canyons for more than 5 km, a 2.100 mt long narrow tunnel to overcome the mountains and steep hills along all the ROW length, with a total extension of 70 km, in line pipes ranging from 10'' and 12'' for the flow lines, 28'' for the gas export line and 8' for the condensate line. An integrated construction work plan was settled in order to face and overcome the complex construction situations found in every feet of the pipeline. Four simultaneous work sites were mobilized, 8 independent work fronts, 700 professionals and more than 150 pieces of heavy construction equipment, brought from 3 different countries. Special techniques were adopted also to handle the challenging detail engineering . All in all, the correct conjunction of a sound engineering work, planning, human resources and equipment and the managing flexibility to create alternatives and solutions at the fast pace required by a dynamic work schedule were essential to succeed, in a job with no room for mistakes. The successfully job completion open new possibilities to other challenging projects alike.(author)

  1. Quantum Entanglement and Projective Ring Geometry

    Directory of Open Access Journals (Sweden)

    Michel Planat

    2006-08-01

    Full Text Available The paper explores the basic geometrical properties of the observables characterizing two-qubit systems by employing a novel projective ring geometric approach. After introducing the basic facts about quantum complementarity and maximal quantum entanglement in such systems, we demonstrate that the 15 × 15 multiplication table of the associated four-dimensional matrices exhibits a so-far-unnoticed geometrical structure that can be regarded as three pencils of lines in the projective plane of order two. In one of the pencils, which we call the kernel, the observables on two lines share a base of Bell states. In the complement of the kernel, the eight vertices/observables are joined by twelve lines which form the edges of a cube. A substantial part of the paper is devoted to showing that the nature of this geometry has much to do with the structure of the projective lines defined over the rings that are the direct product of n copies of the Galois field GF(2, with n = 2, 3 and 4.

  2. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  3. Butterfly valve of all rubber lining type

    International Nuclear Information System (INIS)

    Shimada, Shosaku; Nakatsuma, Sumiya; Sasaki, Iwao; Aoki, Naoshi.

    1982-01-01

    The valves used for the circulating water pipes for condensers in nuclear and thermal power stations have become large with the increase of power output, and their specifications have become strict. The materials for the valves change from cast iron to steel plate construction. To cope with sea water corrosion, rubber lining has been applied to the internal surfaces of valve boxes, and the build-up welding of stainless steel has been made on the edges of valves. However, recently it is desired to develop butterfly valves, of which the whole valve disks are lined with hard rubber. For the purpose of confirming the performance of large bore valves, a 2600 mm bore butterfly valve of all rubber lining type was used, and the opening and closing test of 1100 times was carried out by applying thermal cycle and pressure difference and using artifical sea water. Also the bending test of hard rubber lining was performed with test pieces. Thus, it was confirmed that the butterfly valves of all rubber lining type have the performance exceeding that of the valves with build-up welding. The course of development of the valves of all rubber lining type, the construction and the items of confirmation by tests of these valves, and the tests of the valve and the hard rubber lining described above are reported. (Kako, I.)

  4. Project of law relative to the sanitary consequences of French nuclear weapons tests

    International Nuclear Information System (INIS)

    2009-05-01

    In order to make easy the indemnifications and to include the persons having participate to nuclear weapons tests (Sahara and French Polynesia) and populations leaving in the concerned areas, the project of law relative to the repair of sanitary consequences of nuclear weapons tests proposes to create a right to integral repair of prejudices for the persons suffering of a radioinduced disease coming from these tests. The American example and the British example are given for comparison. The modalities of financing are detailed as well as the social economic and administrative impacts. (N.C.)

  5. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  6. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  7. Shawnee Mission's On-Line Cataloging System

    Directory of Open Access Journals (Sweden)

    Ellen Wasby Miller

    1971-03-01

    Full Text Available An on-line cataloging pilot project for two elementary schools is discussed. The system components are 2740 terminals, upper-lower-case input, IBM's FASTER generalized software package, and usual cards/labels output. Reasons for choosing FASTER, software and hardware features, operating procedures, system performance and costs are detailed. Future expansion to cataloging 100,000 annual K-12 acquisitions, on-line circulation, retrospective conversion, and union book catalogs is set forth.

  8. Grant credit lines for energy efficiency

    International Nuclear Information System (INIS)

    Gramatikov, P.; Iliev, I.

    2010-01-01

    The European Commission established a mechanism of credit lines to integrate more quickly the Bulgarian economy to the open international markets. Thereby it was enabled certain Bulgarian banks to provide grant loans to private companies in the industrial sector for projects of improvement of the energy efficiency of their production. The Bulgarian experience in using of two European credit lines and their role in the current economic crisis is presented in this paper. (authors)

  9. MagLev Cobra: Test Facilities and Operational Experiments

    Science.gov (United States)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  10. A RADIAL VELOCITY TEST FOR SUPERMASSIVE BLACK HOLE BINARIES AS AN EXPLANATION FOR BROAD, DOUBLE-PEAKED EMISSION LINES IN ACTIVE GALACTIC NUCLEI

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Jia; Halpern, Jules P. [Astronomy Department, Columbia University, 550 West 120th Street, New York, NY 10027 (United States); Eracleous, Michael [Department of Astronomy and Institute for Gravitation and The Cosmos, The Pennsylvania State University, 525 Davey Lab, University Park, PA 16802 (United States)

    2016-01-20

    One of the proposed explanations for the broad, double-peaked Balmer emission lines observed in the spectra of some active galactic nuclei (AGNs) is that they are associated with sub-parsec supermassive black hole (SMBH) binaries. Here, we test the binary broad-line region hypothesis through several decades of monitoring of the velocity structure of double-peaked Hα emission lines in 13 low-redshift, mostly radio-loud AGNs. This is a much larger set of objects compared to an earlier test by Eracleous et al. and we use much longer time series for the three objects studied in that paper. Although systematic changes in radial velocity can be traced in many of their lines, they are demonstrably not like those of a spectroscopic binary in a circular orbit. Any spectroscopic binary period must therefore be much longer than the span of the monitoring (assuming a circular orbit), which in turn would require black hole masses that exceed by 1–2 orders of magnitude the values obtained for these objects using techniques such as reverberation mapping and stellar velocity dispersion. Moreover, the response of the double-peaked Balmer line profiles to fluctuations of the ionizing continuum and the shape of the Lyα profiles are incompatible with an SMBH binary. The binary broad-line region hypothesis is therefore disfavored. Other processes evidently shape these line profiles and cause the long-term velocity variations of the double peaks.

  11. Development of acoustically lined ejector technology for multitube jet noise suppressor nozzles by model and engine tests over a wide range of jet pressure ratios and temperatures

    Science.gov (United States)

    Atvars, J.; Paynter, G. C.; Walker, D. Q.; Wintermeyer, C. F.

    1974-01-01

    An experimental program comprising model nozzle and full-scale engine tests was undertaken to acquire parametric data for acoustically lined ejectors applied to primary jet noise suppression. Ejector lining design technology and acoustical scaling of lined ejector configurations were the major objectives. Ground static tests were run with a J-75 turbojet engine fitted with a 37-tube, area ratio 3.3 suppressor nozzle and two lengths of ejector shroud (L/D = 1 and 2). Seven ejector lining configurations were tested over the engine pressure ratio range of 1.40 to 2.40 with corresponding jet velocities between 305 and 610 M/sec. One-fourth scale model nozzles were tested over a pressure ratio range of 1.40 to 4.0 with jet total temperatures between ambient and 1088 K. Scaling of multielement nozzle ejector configurations was also studied using a single element of the nozzle array with identical ejector lengths and lining materials. Acoustic far field and near field data together with nozzle thrust performance and jet aerodynamic flow profiles are presented.

  12. Integrating Theory and Practice: Applying the Quality Improvement Paradigm to Product Line Engineering

    Science.gov (United States)

    Stark, Michael; Hennessy, Joseph F. (Technical Monitor)

    2002-01-01

    My assertion is that not only are product lines a relevant research topic, but that the tools used by empirical software engineering researchers can address observed practical problems. Our experience at NASA has been there are often externally proposed solutions available, but that we have had difficulties applying them in our particular context. We have also focused on return on investment issues when evaluating product lines, and while these are important, one can not attain objective data on success or failure until several applications from a product family have been deployed. The use of the Quality Improvement Paradigm (QIP) can address these issues: (1) Planning an adoption path from an organization's current state to a product line approach; (2) Constructing a development process to fit the organization's adoption path; (3) Evaluation of product line development processes as the project is being developed. The QIP consists of the following six steps: (1) Characterize the project and its environment; (2) Set quantifiable goals for successful project performance; (3) Choose the appropriate process models, supporting methods, and tools for the project; (4) Execute the process, analyze interim results, and provide real-time feedback for corrective action; (5) Analyze the results of completed projects and recommend improvements; and (6) Package the lessons learned as updated and refined process models. A figure shows the QIP in detail. The iterative nature of the QIP supports an incremental development approach to product lines, and the project learning and feedback provide the necessary early evaluations.

  13. DOE/DMS workshop on future synchrotron VUV and x-ray beam Lines

    International Nuclear Information System (INIS)

    Green, P.H.

    1992-03-01

    This document contains an overview of the participating DOE Laboratory beam line interests and the projected science to be addressed on these beam lines, both at new and existing synchrotron facilities. The scientific programs associated with present and planned synchrotron research by DOE Laboratories are discussed in chapters titled ''VUV and Soft X-Ray Research'' and ''Hard X-Ray Research.'' This research encompasses a broad range of the nation's scientific and technical research needs from fundamental to applied, in areas including environmental, biological, and physical sciences; new materials; and energy-related technologies. The projected cost of this proposed construction has been provided in tabular form using a uniform format so that anticipated DOE and outside funding agency contributions for construction and for research and development can be determined. The cost figures are, of course, subject to uncertainties of detailed design requirements and the availability of facility-designed generic components and outside vendors. The report also contains a compendium (as submitted by the beam line proposers) of the design capabilities, the anticipated costs, and the scientific programs of projected beam line construction at the four synchrotron facilities. A summary of the projected cost of these beam lines to be requested of DOE is compiled

  14. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  15. Economic Impact Analysis of Short Line Railroads : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    Rail transportation is of vital : importance to the state of : Louisiana and is a key : component of the states : business infrastructure, supporting agricultural, petroleum, chemical, and manufacturing : industries across the state. Short line (C...

  16. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  17. GEANT4 simulation diagram showing the architecture of the ATLAS test line: the detectors are positioned to receive the beam from the SPS. A muon particle which enters the magnet and crosses all detectors is shown (blue line).

    CERN Multimedia

    2004-01-01

    GEANT4 simulation diagram showing the architecture of the ATLAS test line: the detectors are positioned to receive the beam from the SPS. A muon particle which enters the magnet and crosses all detectors is shown (blue line).

  18. Planning calculations of spray tests for the ERCOSAM-SAMARA project

    Energy Technology Data Exchange (ETDEWEB)

    Liang, Z. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Andreani, M. [Paul Scherrer Institut, Laboratory for Thermal-Hydraulics, Villigen (Switzerland)

    2012-07-01

    Within the framework of the ERCOSAM-SAMARA project, co-funded by the European Union and the Russian State Atomic Energy Corporation, planning and pre-test calculations are performed to examine sensitivity parameters that can affect the break-up (erosion) of a helium (substitute for hydrogen) layer by mitigation devices (i.e., cooler, spray, or Passive Autocatalytic Recombiner - PAR). This paper reports the GOTHIC analysis results for the spray tests to be performed in the PANDA facility. The effects of spray flow rate, temperature and injection height on depressurization, erosion of helium cloud and gas transport behavior are studied. This analysis is valuable because only a limited number of conditions will be examined in the planned experiments. The study provides a useful understanding of the interaction of spray with a stratified atmosphere. (author)

  19. Final Project Report on RCCS Testing with Air-based NSTF

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, Darius D. [Argonne National Lab. (ANL), Argonne, IL (United States); Gerardi, Craig D. [Argonne National Lab. (ANL), Argonne, IL (United States); Kilsdonk, Dennis J. [Argonne National Lab. (ANL), Argonne, IL (United States); Bremer, Nathan C. [Argonne National Lab. (ANL), Argonne, IL (United States); Lomperski, Stephen W. [Argonne National Lab. (ANL), Argonne, IL (United States); Hu, Rui [Argonne National Lab. (ANL), Argonne, IL (United States); Kraus, Adam R. [Argonne National Lab. (ANL), Argonne, IL (United States); Bucknor, Matthew D. [Argonne National Lab. (ANL), Argonne, IL (United States); Lv, Qiuping [Argonne National Lab. (ANL), Argonne, IL (United States); Lee, Taeseung [Argonne National Lab. (ANL), Argonne, IL (United States); Farmer, Mitchell T. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The following report serves as a comprehensive summary of the air-based portion of the Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne National Laboratory (Argonne). Initiated in 2005 to generate validation data for the Next Generation Nuclear Plant (NGNP), the project was centered on an experimental testing program to study the behavior and bound the performance of Reactor Cavity Cooling System (RCCS) concepts. Parallel modeling and simulation efforts also have been performed to guide the design, fabrication, and operation of NSTF, as well as to assess the suitability of analysis methods for natural convection systems. The program operates under support from the Department of Energy (DOE) Office of Advanced Reactor Technologies (ART), and maintained compliance with NQA-1 2008 with 2009a in both administrative and technical portions of program activities.

  20. Test facility for investigation of heating of 30 GHz accelerating structure imitator for the CLIC project

    CERN Document Server

    Elzhov, A V; Kaminsky, A K; Kuzikov, S V; Perelshtejn, E A; Peskov, N Yu; Petelin, M I; Sedykh, S N; Sergeev, A P; Sergeev, A S; Syratchev, I V; Zaitsev, N I

    2004-01-01

    Since 2001 an experimental test facility for investigation of lifetime of a copper material, with respect to multiple RF pulse actions, was set up on the basis of the JINR (Dubna) FEM oscillator, in collaboration with IAP RAS (Nizhny Novgorod). A high-Q copper cavity, which simulates the parameters of the accelerating structure of the collider CLIC at an operating frequency of 30GHz, is used in the investigation. The experimental setup consists of a wavebeam injector - FEM oscillator (power of similar to 25MW, pulse duration up to 200ns, spectral bandwidth not higher than 0.1%), a quasi-optic two-mirror transmission line, a wave-type converter, and a testing cavity. The frequency and transmission features of the components of the quasi-optic line were analyzed.

  1. Fabrication, inspection, and test plan for the Advanced Test Reactor (ATR) Mixed-Oxide (MOX) fuel irradiation project

    International Nuclear Information System (INIS)

    Wachs, G.W.

    1997-11-01

    The Department of Energy (DOE) Fissile Materials Disposition Materials Disposition Program (FMDP) has announced that reactor irradiation of MOX fuel is one of the preferred alternatives for disposal of surplus weapons-usable plutonium (Pu). MOX fuel has been utilized domestically in test reactors and on an experimental basis in a number of Commercial Light Water Reactors (CLWRs). Most of this experience has been with Pu derived from spent low enriched uranium (LEU) fuel, known as reactor grade (RG) Pu. The MOX fuel test will be irradiated in the ATR to provide preliminary data to demonstrate that the unique properties of surplus weapons-derived or weapons-grade (WG) plutonium (Pu) do not compromise the applicability of this MOX experience base. In addition, the test will contribute experience with irradiation of gallium-containing fuel to the data base required for resolution of generic CLWR fuel design issues (ORNL/MD/LTR-76). This Fabrication, Inspection, and Test Plan (FITP) is a level 2 document as defined in the FMDP LWR MOX Fuel Irradiation Test Project Plan (ORNL/MD/LTR-78)

  2. Project fast breeder (PSB)

    International Nuclear Information System (INIS)

    1978-01-01

    The annual report of the fast breeder project (PSB) contains contributions of the participating institutes on the four subjects: 1) Development of oxidic fuel rods and materials for the SNR line, 2) Physics and safety investigations for the SNR line, 3) Carbidic fuel elements, and 4) Back-up solution with gaseous coolant. (HK) [de

  3. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  4. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  5. OECD/NEA Sandia Fuel Project phase I: Benchmark of the ignition testing

    Energy Technology Data Exchange (ETDEWEB)

    Adorni, Martina, E-mail: martina_adorni@hotmail.it [UNIPI (Italy); Herranz, Luis E. [CIEMAT (Spain); Hollands, Thorsten [GRS (Germany); Ahn, Kwang-II [KAERI (Korea, Republic of); Bals, Christine [GRS (Germany); D' Auria, Francesco [UNIPI (Italy); Horvath, Gabor L. [NUBIKI (Hungary); Jaeckel, Bernd S. [PSI (Switzerland); Kim, Han-Chul; Lee, Jung-Jae [KINS (Korea, Republic of); Ogino, Masao [JNES (Japan); Techy, Zsolt [NUBIKI (Hungary); Velazquez-Lozad, Alexander; Zigh, Abdelghani [USNRC (United States); Rehacek, Radomir [OECD/NEA (France)

    2016-10-15

    Highlights: • A unique PWR spent fuel pool experimental project is analytically investigated. • Predictability of fuel clad ignition in case of a complete loss of coolant in SFPs is assessed. • Computer codes reasonably estimate peak cladding temperature and time of ignition. - Abstract: The OECD/NEA Sandia Fuel Project provided unique thermal-hydraulic experimental data associated with Spent Fuel Pool (SFP) complete drain down. The study conducted at Sandia National Laboratories (SNL) was successfully completed (July 2009 to February 2013). The accident conditions of interest for the SFP were simulated in a full scale prototypic fashion (electrically heated, prototypic assemblies in a prototypic SFP rack) so that the experimental results closely represent actual fuel assembly responses. A major impetus for this work was to facilitate severe accident code validation and to reduce modeling uncertainties within the codes. Phase I focused on axial heating and burn propagation in a single PWR 17 × 17 assembly (i.e. “hot neighbors” configuration). Phase II addressed axial and radial heating and zirconium fire propagation including effects of fuel rod ballooning in a 1 × 4 assembly configuration (i.e. single, hot center assembly and four, “cooler neighbors”). This paper summarizes the comparative analysis regarding the final destructive ignition test of the phase I of the project. The objective of the benchmark is to evaluate and compare the predictive capabilities of computer codes concerning the ignition testing of PWR fuel assemblies. Nine institutions from eight different countries were involved in the benchmark calculations. The time to ignition and the maximum temperature are adequately captured by the calculations. It is believed that the benchmark constitutes an enlargement of the validation range for the codes to the conditions tested, thus enhancing the code applicability to other fuel assembly designs and configurations. The comparison of

  6. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  7. The socio-economic base line survey; first chapter of the handbook under preparation: "Managing farmers: a handbook for working with farmers in irrigation and drainage projects"

    NARCIS (Netherlands)

    Schrevel, A.

    2002-01-01

    The text The socio-economic base line survey is the first chapter of a book under preparation meant to instruct senior staff of irrigation and drainage projects on techniques to work with farmers. It informs the reader of best practices to set up and execute a socio-economic baseline survey. The

  8. UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

    Science.gov (United States)

    Gong, Chester; Wu, Minghong G.; Santiago, Confesor

    2016-01-01

    The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

  9. On-line valve monitoring at the Ormen Lange gas plant

    Energy Technology Data Exchange (ETDEWEB)

    Greenlees, R.; Hale, S. [Score Atlanta Inc., Kennesaw, Georgia (United States)

    2011-07-01

    acoustic leakage detection. The valves test themselves during each operation and the Shell engineer responsible for valve condition monitoring is not even located at the site. The V-MAP on line valve monitoring system was one of the systems selected to meet the condition monitoring goals of the Project. The full paper on this topic and the accompanying presentation describes in detail how this plant achieved its goals, and how the same approach could be used to significantly reduce nuclear outage valve testing and personnel exposure, while improving plant efficiency and retrieving lost megawatts.

  10. On-line valve monitoring at the Ormen Lange gas plant

    International Nuclear Information System (INIS)

    Greenlees, R.; Hale, S.

    2011-01-01

    detection. The valves test themselves during each operation and the Shell engineer responsible for valve condition monitoring is not even located at the site. The V-MAP on line valve monitoring system was one of the systems selected to meet the condition monitoring goals of the Project. The full paper on this topic and the accompanying presentation describes in detail how this plant achieved its goals, and how the same approach could be used to significantly reduce nuclear outage valve testing and personnel exposure, while improving plant efficiency and retrieving lost megawatts.

  11. The project of mutation breeding in barley (first report)

    International Nuclear Information System (INIS)

    2010-01-01

    Barley is a second main crop with the production of 7 million tons per year and 3,5 million hectare cultivation area in Turkey. Because of wateer deficiency, cereals cultivated in Central Anatolian region. Barley is well adapted to dry farming system besides it is basic food for animal husbandry and main raw material for brewery industry. the main problems in barley production are drought disease epidemic and increasing salinity gradually. Main purposes of our project is to increase resistance and tolerence to this stress factors. In order to reach to our aim we have been using mutation breeding techniques and conventional breeding methods. This Project has been started with irradiation of barley seeds with different gamma ray doses. After that resistant and tolerant mutant has been selected most of these mutanys have resistance and tolerance to different disease and stress conditions. During the selection procedure, hydroponics and tissue culture techniques have been applied to improve the selection efficiency. Up to now, promising barley mutant lines 71 that have earliness (30 days) than parents and because of that reason that escape from drought period. Disease tests of our mutant lines have been conducted under controlled conditions and tolerant lines have been determined under the high the high epidemic conditions. Salt tolerance studies have been applied under hydroponics conditions and salt tolerant mutant have been determined under 180-200mMolNaCl concentration. All mutant lines are carried out to preliminary yield trials for their evaluation

  12. The Rorschach: projective technique or psychometric test?

    Science.gov (United States)

    Aronow, E; Reznikoff, M; Moreland, K L

    1995-04-01

    Various approaches to the Rorschach Technique are described in terms of the idiographic-nomothetic axis and the perceptual-content axis. It is suggested that it is most productive to view the Rorschach as a projective tool, with perceptual scoring a secondary factor. Current efforts at objectification of the Rorschach are not seen as useful as efforts to enhance its projective qualities. Some possible ways are discussed in which the projective value of the instrument can be maximized.

  13. [The smile line, a literature search].

    Science.gov (United States)

    van der Geld, P A; van Waas, M A

    2003-09-01

    Beautiful teeth, visible when smiling, are in line with the present ideal of beauty. The display of teeth when smiling is determined by the smile line: the projection of the lower border of the upper lip on the maxillary teeth when smiling. On the basis of a literature search the determining methods of the smile line are discussed, demographic data of the position of the smile line are given, and factors of influence are examined. There is no unequivocal method for determining the position of the smile line. A rough distinction can be made between qualitative and (semi)-quantitative methods. The (semi)-quantitative methods have clear advantages for research purposes, but their reliability is unknown. It was demonstrated that among minimally 40% of subjects the maxillary gingiva was not visible when smiling. The mandibular gingiva was not visible when smiling among more than 90% of subjects. Furthermore, it appeared that among women the smile line was on average higher situated than among men and that it has not yet been proven that the smile line will be situated lower when growing older.

  14. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    Science.gov (United States)

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  15. Initial field testing definition of subsurface sealing and backfilling tests in unsaturated tuff; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, J.A. [Sandia National Labs., Albuquerque, NM (United States); Case, J.B.; Tyburski, J.R. [I. T. Corp., Albuquerque, NM (United States)

    1993-05-01

    This report contains an initial definition of the field tests proposed for the Yucca Mountain Project repository sealing program. The tests are intended to resolve various performance and emplacement concerns. Examples of concerns to be addressed include achieving selected hydrologic and structural requirements for seals, removing portions of the shaft liner, excavating keyways, emplacing cementitious and earthen seals, reducing the impact of fines on the hydraulic conductivity of fractures, efficient grouting of fracture zones, sealing of exploratory boreholes, and controlling the flow of water by using engineered designs. Ten discrete tests are proposed to address these and other concerns. These tests are divided into two groups: Seal component tests and performance confirmation tests. The seal component tests are thorough small-scale in situ tests, the intermediate-scale borehole seal tests, the fracture grouting tests, the surface backfill tests, and the grouted rock mass tests. The seal system tests are the seepage control tests, the backfill tests, the bulkhead test in the Calico Hills unit, the large-scale shaft seal and shaft fill tests, and the remote borehole sealing tests. The tests are proposed to be performed in six discrete areas, including welded and non-welded environments, primarily located outside the potential repository area. The final selection of sealing tests will depend on the nature of the geologic and hydrologic conditions encountered during the development of the Exploratory Studies Facility and detailed numerical analyses. Tests are likely to be performed both before and after License Application.

  16. Six Sigma methods applied to cryogenic coolers assembly line

    Science.gov (United States)

    Ventre, Jean-Marc; Germain-Lacour, Michel; Martin, Jean-Yves; Cauquil, Jean-Marc; Benschop, Tonny; Griot, René

    2009-05-01

    Six Sigma method have been applied to manufacturing process of a rotary Stirling cooler: RM2. Name of the project is NoVa as main goal of the Six Sigma approach is to reduce variability (No Variability). Project has been based on the DMAIC guideline following five stages: Define, Measure, Analyse, Improve, Control. Objective has been set on the rate of coolers succeeding performance at first attempt with a goal value of 95%. A team has been gathered involving people and skills acting on the RM2 manufacturing line. Measurement System Analysis (MSA) has been applied to test bench and results after R&R gage show that measurement is one of the root cause for variability in RM2 process. Two more root causes have been identified by the team after process mapping analysis: regenerator filling factor and cleaning procedure. Causes for measurement variability have been identified and eradicated as shown by new results from R&R gage. Experimental results show that regenerator filling factor impacts process variability and affects yield. Improved process haven been set after new calibration process for test bench, new filling procedure for regenerator and an additional cleaning stage have been implemented. The objective for 95% coolers succeeding performance test at first attempt has been reached and kept for a significant period. RM2 manufacturing process is now managed according to Statistical Process Control based on control charts. Improvement in process capability have enabled introduction of sample testing procedure before delivery.

  17. Guidelines for remote handling maintenance of ITER neutral beam line components: Proposal of an alternate supporting system

    International Nuclear Information System (INIS)

    Cordier, J.J.; Bayetti, P.; Hemsworth, R.; David, O.; Friconneau, J.P.

    2007-01-01

    Remote handling (R/H) maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the assembly and nuclear phase of exploitation of ITER. It must be considered at a very early stage since it significantly impacts on the components design, interfaces management, assembly, maintenance and integration aspects. A large part of the R/H equipment will be procured by the EU Participating Team, including the whole Neutral Beam R/H Equipment. The Neutral Beam Heating and Current Drive system (NB and CD) design is being revisited by the ITER project. A vertical maintenance scheme is presently considered which may significantly impact on the reference design and associated components and lead to a new design of the NB and CD vacuum tank. In addition, NB line components remote handling solutions are being studied. The neutral beam test facility ITER to be built in Europe in the near future is also based on the vertical NB maintenance scheme of beam line components. New design guidelines compliant for both the ITER NB and CD system and the NB test facility proposed by the CEA association are described in the paper

  18. {open_quotes}O{close_quotes} ring sealed process tube, Phase II, test project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.E.

    1951-04-09

    The {open_quotes}O{close_quotes} ring seal has been proposed to replace the van stone flange and the bellows thermal expansion assembly currently used on the existing Hanford piles to achieve water and gas seals, respectively. Possible advantages of the {open_quotes}O{close_quotes} ring seal are: (1) simplification of component parts and elimination of van stone corrosion; (2) simplification of maintenance; (3) lower costs of initial erection; (4) increased strength. This test supplements Test Project No. 27 (a preliminary thermal cycling test) in applying the {open_quotes}O{close_quotes} ring seal assembly to actual pile operating conditions.

  19. Thermal-Hydraulic Integral Effect Test with ATLAS for an Intermediate Break Loss of Coolant Accident at a Pressurizer Surge Line

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung Ho; Seok Cho; Park, Hyun Sik; Choi, Nam Hyun; Park, Yu Sun; Kim, Jong Rok; Bae, Byoung Uhn; Kim, Yeon Sik; Kim, Kyung Doo; Choi, Ki Yong; Song, Chul Hwa [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    The main objectives of this test were not only to provide physical insight into the system response of the APR1400 during the pressurizer surge line break accident but also to produce an integral effect test data to validate the SPACE code. In order to simulate a double-ended guillotine break of a pressurizer surge line in the APR1400, the IB-SUR-01R test was performed with ATLAS. The major thermal-hydraulic phenomena such as the system pressures, the collapsed water levels, and the break flow rate were presented and discussed. Despite the core was uncovered, no excursion in the cladding temperature was observed. The pressurizer surge line break can be classified as a hot leg break from a break location point of view. Compared with a cold leg break, coolability in the core may be better in case of a hot leg break due to the enhanced flow in the core region. This integral effect test data will be used to evaluate the prediction capability of existing safety analysis codes of the MARS and the RELAP5 as well as the SPACE code. Furthermore, this data can be utilized to identify any code deficiency for an IBLOCA simulation, especially for DVI-adapted plants. Redefinition of break size for design basis accident (DBA) based on risk information is being extensively investigated due to the potential for safety benefits and unnecessary burden reduction from current LBLOCA (large break loss of coolant accident)-based ECC (Emergency Core Cooling) Acceptance Criteria. As a transition break size (TBS), the rupture of medium-size pipe is considered to be more important than ever in risk-informed regulation (RIR)-relevant safety analysis. As plants age, are up-rated, and continue to seek improved operating efficiencies, the small break and intermediate break LOCA (IBLOCA) can become a concern. In particular, IBLOCA with DVI (Direct Vessel Injection) features will be addressed to support redefinition of a design-basis LOCA. With an aim of expanding code validation to address small

  20. A modular restoration tower for electric power line transmission

    Energy Technology Data Exchange (ETDEWEB)

    Nicolazzi, L.C.; Pereira, J.C.; Leonel, C.E.L.; Rocha, G.B.; Bianchezzi, V.; Mendes, F. [Universidade Federal Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica], Emails: lauro@grante.ufsc.br, jcarlos@grante.ufsc.br; Luz, R.L. [ELETROSUL Centrais Eletricas S.A., Florianopolis, SC (Brazil)], Email: rluz@eletrosul.gov.br

    2009-07-01

    The main target of this R and D project is to develop an restoration tower for electric energy lines transmission. Whereas these towers should present the main features like transport facility, easiest assembling associated with a low cost of manufacture, it was applied the single-column tower concepts supported by stays, modularized, framed and articulated at the base. The concepts used for this development was a design methodology. From the different definition situations of load, numerical models have been developed focusing the design to the best of structural element arrangements of its modules. Then, tests were performed in laboratory to determine the module structural performance for different work load situations. These tests served to identify inconsistencies in the numerical models and proposed adjustments in its design to improve its performance on the strength and stability. (author)

  1. The relationship between CD86/CD54 expression and THP-1 cell viability in an in vitro skin sensitization test--human cell line activation test (h-CLAT).

    Science.gov (United States)

    Sakaguchi, Hitoshi; Ashikaga, Takao; Miyazawa, Masaaki; Kosaka, Nanae; Ito, Yuichi; Yoneyama, Katsurako; Sono, Sakiko; Itagaki, Hiroshi; Toyoda, Hidekazu; Suzuki, Hiroyuki

    2009-04-01

    Recent regulations for cosmetics in Europe prohibit animal testing for evaluating the sensitization potential of chemicals to improve animal welfare. Yet, there is not an acceptable Organization for Economic Co-operation and Development non-animal skin sensitization test method. Several in vitro skin sensitization methods that focus on the activation of Langerhans cells, including human cell lines, are being evaluated as possible alternatives. In our previous study, we optimized our human cell line activation test (h-CLAT) using THP-1 cells (monocytic leukemia cell line) and conducted an inter-laboratory study. We found that measuring CD86/CD54 expression may be useful for predicting skin sensitization. The aim of this study was to confirm the relationship between CD86/CD54 expression and THP-1 cell viability in the h-CLAT. In this study, 21 allergens (e.g., dinitrochlorobenzene, p-phenylenediamine, Ni) and 8 non-allergens (e.g., SLS, lactic acid) were evaluated. For each chemical, more than 10 concentrations that gave a predicted cell viability range of 20-95% were used. The data showed that expression patterns of CD86/CD54 differed depending on chemical. For most allergens, cytotoxicity (65-90% cell viability) was needed for enhancement of CD86/CD54 expression. The criteria of "CD86 > or = 150 or CD54 > or = 200" resulted in an accuracy of 93%, which confirms appropriate cut-off criteria for h-CLAT. Furthermore, a good correlation was observed between EC3 of local lymph node assay and EC150(CD86) or EC200(CD54) of h-CLAT (12 or 16 chemicals, respectively), which would provide a useful estimate of allergic potency. These findings suggest that h-CLAT would be a good robust in vitro skin sensitization test.

  2. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  3. The HADES demonstration and pilot project on radioactive waste disposal in a clay formation

    International Nuclear Information System (INIS)

    Bonne, A.; Beckers, H.; Beaufays, R.; Buyens, M.; Coursier, J.; Bruyn, D. de; Fonteyne, A.; Genicot, J.; Lamy, D.; Meynendonckx, P.; Monsecour, M.; Neerdael, B.; Noynaert, L.; Voet, M.; Volekaert, G.

    1992-01-01

    The overall objective of the HADES programme is the evaluation of the technical feasibility and safety of the disposal of radwaste in a deep clay formation. The pilot phase is aimed at demonstrating the system behaviour for those components of the system and those operations and issues which can be demonstrated directly. The time period considered covers a first phase of the development programme of the pilot project which includes: -The construction of a concrete lined tests drift of about 30 m length with a useful inner diameter of 3.5 m. In the lining, a number of openings or ports are foreseen for emplacing the various tests and sensors for the general auscultation in the host rock; - Mine-by test for the investigation of the response of the surrounding clay on the excavating; - CERBERUS test, a combined heating-irradiation test aiming at evaluating by simulation (electrical heaters and Co-60 radiation source) the impact of a HLW canister on its immediate near field; - Design of a gallery heating test for the demonstration by simulation of the behaviour of a concrete lined gallery structure and of the surrounding clay mass in a temperature field (TEMPPRES code for temperature and pressure evolution simulation). 21 refs

  4. The use of particle accelerators for space projects

    International Nuclear Information System (INIS)

    Virtanen, Ari

    2006-01-01

    With the introduction of CMOS technology radiation effects in components became an important issue in satellite and space mission projects. At the end of the cold war, the market of radiation hard (RadHard) components crashed and during the 90's their fabrication practically stopped. The use of 'commercial-off-the-shelf' (COTS) components became more common but required increased evaluation activities at radiation test sites. Component manufacturers and space project engineers were directed towards these test sites, in particular, towards particle accelerators. Many accelerator laboratories developed special beam lines and constructed dedicated test areas for component evaluations. The space environment was simulated at these test sites and components were tested to levels often exceeding mission requirements. In general, space projects environments were predicted in respects to particle mass and energy distributions with the expected fluxes and fluences. In order to validate this information in tests, concepts like stopping power, linear energy transfer, ion penetration ranges etc. have to be understood. The knowledge from the component structure also defines the way of irradiation. For example, the higher ion energies resulting in much deeper ion penetration ranges allow successful reverse side irradiation of thinned Integrated Circuits (ICs). So overall increased demands for radiation testing attracted the European Space Agency (ESA) to the JYFL-accelerator laboratory of the University of Jyvaeskylae, Finland. A contract was signed between ESA and JYFL for the development of a 'High Penetrating Heavy Ion Test Site'. Following one year development, this test site was commissioned in May 2005. This paper addresses the various issues around the JYFL laboratory with its accelerator and radiation effects facility as the focal point in service of component evaluations for the space community

  5. 3D-shape of objects with straight line-motion by simultaneous projection of color coded patterns

    Science.gov (United States)

    Flores, Jorge L.; Ayubi, Gaston A.; Di Martino, J. Matías; Castillo, Oscar E.; Ferrari, Jose A.

    2018-05-01

    In this work, we propose a novel technique to retrieve the 3D shape of dynamic objects by the simultaneous projection of a fringe pattern and a homogeneous light pattern which are both coded in two of the color channels of a RGB image. The fringe pattern, red channel, is used to retrieve the phase by phase-shift algorithms with arbitrary phase-step, while the homogeneous pattern, blue channel, is used to match pixels from the test object in consecutive images, which are acquired at different positions, and thus, to determine the speed of the object. The proposed method successfully overcomes the standard requirement of projecting fringes of two different frequencies; one frequency to extract object information and the other one to retrieve the phase. Validation experiments are presented.

  6. First line management in the public sector

    DEFF Research Database (Denmark)

    Voxted, Søren

    The paper will examines and discusses the results from a structured observational study, wherein 50 first-line managers from the public sector in Denmark in five areas of employment where observed. These observational studies are a key contribution in the ‘greenhouse for management’ project...... in first-line managers’ practice. Answering this question helps to illustrate and understand the degree of professionalism in terms of managers' usage of time....

  7. Thin blue lines: product placement and the drama of pregnancy testing in British cinema and television.

    Science.gov (United States)

    Olszynko-Gryn, Jesse

    2017-09-01

    This article uses the case of pregnancy testing in Britain to investigate the process whereby new and often controversial reproductive technologies are made visible and normalized in mainstream entertainment media. It shows how in the 1980s and 1990s the then nascent product placement industry was instrumental in embedding pregnancy testing in British cinema and television's dramatic productions. In this period, the pregnancy-test close-up became a conventional trope and the thin blue lines associated with Unilever's Clearblue rose to prominence in mainstream consumer culture. This article investigates the aestheticization of pregnancy testing and shows how increasingly visible public concerns about 'schoolgirl mums', abortion and the biological clock, dramatized on the big and small screen, propelled the commercial rise of Clearblue. It argues that the Clearblue close-up ambiguously concealed as much as it revealed; abstraction, ambiguity and flexibility were its keys to success.

  8. Goodness-of-Fit Tests For Elliptical and Independent Copulas through Projection Pursuit

    Directory of Open Access Journals (Sweden)

    Jacques Touboul

    2011-04-01

    Full Text Available Two goodness-of-fit tests for copulas are being investigated. The first one deals with the case of elliptical copulas and the second one deals with independent copulas. These tests result from the expansion of the projection pursuit methodology that we will introduce in the present article. This method enables us to determine on which axis system these copulas lie as well as the exact value of these very copulas in the basis formed by the axes previously determined irrespective of their value in their canonical basis. Simulations are also presented as well as an application to real datasets.

  9. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    International Nuclear Information System (INIS)

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  10. MagLev Cobra: Test Facilities and Operational Experiments

    International Nuclear Information System (INIS)

    Sotelo, G G; Dias, D H J N; De Oliveira, R A H; Ferreira, A C; De Andrade, R Jr; Stephan, R M

    2014-01-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa 2 Cu 3 O 7−δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  11. Modeling bubble condenser containment with computer code COCOSYS: post-test calculations of the main steam line break experiment at ELECTROGORSK BC V-213 test facility

    International Nuclear Information System (INIS)

    Lola, I.; Gromov, G.; Gumenyuk, D.; Pustovit, V.; Sholomitsky, S.; Wolff, H.; Arndt, S.; Blinkov, V.; Osokin, G.; Melikhov, O.; Melikhov, V.; Sokoline, A.

    2005-01-01

    Containment of the WWER-440 Model 213 nuclear power plant features a Bubble Condenser, a complex passive pressure suppression system, intended to limit pressure rise in the containment during accidents. Due to lack of experimental evidence of its successful operation in the original design documentation, the performance of this system under accidents with ruptures of large high-energy pipes of the primary and secondary sides remains a known safety concern for this containment type. Therefore, a number of research and analytical studies have been conducted by the countries operating WWER-440 reactors and their Western partners in the recent years to verify Bubble Condenser operation under accident conditions. Comprehensive experimental research studies at the Electrogorsk BC V-213 test facility, commissioned in 1999 in Electrogorsk Research and Engineering Centre (EREC), constitute essential part of these efforts. Nowadays this is the only operating large-scale facility enabling integral tests on investigation of the Bubble Condenser performance. Several large international research projects, conducted at this facility in 1999-2003, have covered a spectrum of pipe break accidents. These experiments have substantially improved understanding of the overall system performance and thermal hydraulic phenomena in the Bubble Condenser Containment, and provided valuable information for validating containment codes against experimental results. One of the recent experiments, denoted as SLB-G02, has simulated steam line break. The results of this experiment are of especial value for the engineers working in the area of computer code application for WWER-440 containment analyses, giving an opportunity to verify validity of the code predictions and identify possibilities for model improvement. This paper describes the results of the post-test calculations of the SLB-G02 experiment, conducted as a joint effort of GRS, Germany and Ukrainian technical support organizations for

  12. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  13. Draw the Line!

    DEFF Research Database (Denmark)

    present proceedings from the UPGEM conference "Draw the Line!" in Copenhagen May 2008. The proceedings include contributions by UPGEM researchers, conference speeches by other researchers, politicians and gender equality officers in which they relate their work and research with the research done in UPGEM......Draw the Line! International Conference, Copenhagen 2008 Papers, proceedings and recommendations is the second publication of the international three year long project "Understanding Puzzles in the Gendered European Map" (UPGEM), which is financed by the European Commission. In this publication we....... The UPGEM research has previously been published in national reports from each of the partner countries (Denmark, Estonia, Finland, Italy and Poland). In these individual national reports of universities as workplaces for male and female researchers we discuss scientific cultures in physics embedded...

  14. The US National Resources Defense Council/Soviet Academy of Sciences Nuclear Test Ban Verification Project

    International Nuclear Information System (INIS)

    Cochran, T.B.

    1989-01-01

    The first week in September 1987 was an extraordinary one for arms control verification. As part of the co-operative Test Ban Verification Project of the Natural Resources Defense Council (NRDC) and the Soviet Academy of Sciences, fourteen American scientists from the Scripps Institution of Oceanography (at the University of California- San Diego), University of Nevada-Reno and the University of Colorado went to the region of the Soviet's principal nuclear test site near Semipalatinsk. Together with their Soviet counterparts from the Institute of Physics of the Earth (IPE) in Moscow, they fired off three large chemical explosions. The purpose of these explosions was to demonstrate the sensitivity of the three seismic stations surrounding the test site, to study the efficiency with which high-frequency seismic waves propagate in the region, and to study differences between chemical explosions, nuclear explosions and earthquakes in order more firmly to establish procedures for verification of a nuclear test ban. This paper presents a review of the results of these experiments, an update on the status of the joint project, and a review of the significance of high frequency seismic data to test ban verification

  15. THE LICK AGN MONITORING PROJECT 2011: SPECTROSCOPIC CAMPAIGN AND EMISSION-LINE LIGHT CURVES

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Aaron J. [Department of Physics and Astronomy, 4129 Frederick Reines Hall, University of California, Irvine, CA, 92697-4575 (United States); Bennert, Vardha N. [Physics Department, California Polytechnic State University, San Luis Obispo, CA 93407 (United States); Canalizo, Gabriela [Department of Physics and Astronomy, University of California, Riverside, CA 92521 (United States); Filippenko, Alexei V.; Li, Weidong [Department of Astronomy, University of California, Berkeley, CA 94720-3411 (United States); Gates, Elinor L. [Lick Observatory, P.O. Box 85, Mount Hamilton, CA 95140 (United States); Greene, Jenny E. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Malkan, Matthew A.; Treu, Tommaso [Department of Physics and Astronomy, University of California, Los Angeles, CA 90095-1547 (United States); Pancoast, Anna [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Sand, David J. [Texas Tech University, Physics Department, Box 41051, Lubbock, TX 79409-1051 (United States); Stern, Daniel [Jet Propulsion Laboratory, California Institute of Technology, 4800 Oak Grove Boulevard, Pasadena, CA 91109 (United States); Woo, Jong-Hak [Astronomy Program, Department of Physics and Astronomy, Seoul National University, Seoul 151-742 (Korea, Republic of); Assef, Roberto J. [Núcleo de Astronomía de la Facultad de Ingeniería, Universidad Diego Portales, Av. Ejército Libertador 441, Santiago (Chile); Bae, Hyun-Jin [Department of Astronomy and Center for Galaxy Evolution Research, Yonsei University, Seoul 120-749 (Korea, Republic of); Brewer, Brendon J. [Department of Statistics, The University of Auckland, Private Bag 92019, Auckland 1142 (New Zealand); Cenko, S. Bradley [Astrophysics Science Division, NASA Goddard Space Flight Center, MC 661, Greenbelt, MD 20771 (United States); and others

    2015-04-15

    In the Spring of 2011 we carried out a 2.5 month reverberation mapping campaign using the 3 m Shane telescope at Lick Observatory, monitoring 15 low-redshift Seyfert 1 galaxies. This paper describes the observations, reductions and measurements, and data products from the spectroscopic campaign. The reduced spectra were fitted with a multicomponent model in order to isolate the contributions of various continuum and emission-line components. We present light curves of broad emission lines and the active galactic nucleus (AGN) continuum, and measurements of the broad Hβ line widths in mean and rms spectra. For the most highly variable AGNs we also measured broad Hβ line widths and velocity centroids from the nightly spectra. In four AGNs exhibiting the highest variability amplitudes, we detect anticorrelations between broad Hβ width and luminosity, demonstrating that the broad-line region “breathes” on short timescales of days to weeks in response to continuum variations. We also find that broad Hβ velocity centroids can undergo substantial changes in response to continuum variations; in NGC 4593, the broad Hβ velocity shifted by ∼250 km s{sup −1} over a 1 month period. This reverberation-induced velocity shift effect is likely to contribute a significant source of confusion noise to binary black hole searches that use multi-epoch quasar spectroscopy to detect binary orbital motion. We also present results from simulations that examine biases that can occur in measurement of broad-line widths from rms spectra due to the contributions of continuum variations and photon-counting noise.

  16. Elk and plants thrive near power lines

    Energy Technology Data Exchange (ETDEWEB)

    Lustre, L.

    1997-11-01

    Butterflies and elk gather in clearings near power line right-of-ways and on the edges of such clearings, where the wild flowers and plants that have widely disappeared as a result of intensive farming and subsurface drainage of fields have found a good habitat. Ornamental coniferous trees, various herbs and assorted berries do well and can be harvested near power lines from woodland clearings once thought unfit for cultivation. IVS, the nationwide network company, takes part in many projects aiming both to increase productive utilization of land areas under power lines and to promote biodiversity

  17. Successful test of SPS-to-LHC beamline

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    On 23 October there was great excitement in the Prevessin control room when, on the first attempt, a beam passed over 2.5 km down the new SPS-to-LHC transfer line, TI8, to within a few metres of the LHC tunnel. Members of the AB, AT and TS departments involved in the beamline and its test, celebrate their success with the Director General, Robert Aymar, and the LHC Project Leader, Lyn Evans.

  18. Successful test of SPS-to-LHC beamline

    CERN Multimedia

    2004-01-01

    On 23 October there was great excitement in the Prevessin control room when, on the first attempt, a beam passed over 2.5 km down the new SPS-to-LHC transfer line, TI8, to within a few metres of the LHC tunnel. Above: members of the AB, AT and TS departments involved in the beamline and its test, celebrate their success with the Director General, Robert Aymar, and the LHC Project Leader, Lyn Evans.

  19. Project installation the large equipment in line system in Brazil. Gas export line valve P-40 FPSO-MLS. Field Marlim Sul, Campos Basin, Brazil; Operacao de instalacao do maior equipamento no sistema in line ja realizado no Brasil. Valvula do gasoduto P-40 X FPSO-MLS. Campo de Marlim Sul, Bacia de Campos, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Marcos Antonio Rodrigues; Fernandes, Paulo Tavares [PETROBRAS, Campos dos Goytacases, RJ (Brazil). Exploracao e Producao

    2005-07-01

    This work will approach the current level of development of the installation of connected underwater equipment to flexible lines in the underwater engineering operations in Campos' Basin. The project will show studies, analysis and simulations (through software developed by PETROBRAS) about the installation of the largest equipment laid in the 'in-line' system (connected to flexible lines) in Brazil - and one of the largest of the world: the ESDV (Emergency Shut Down Valve) of the gas pipeline P-40 x FPSO-MLS, in the South Marlim field, in Campos' Basin. This ESDV, of about 18.000 kg, 4 m height and 6,5 m length, has the purpose of assuring the safety conditions on the facilities, interrupting the gas flow exported for P-40 in case of emergency situations. Its installation opened a new alternative in releasing underwater equipment, using the ships that install the flexible lines. This operation occurred in June, 2004, and required the use of a second vessel for support and monitoring of the ESDV laying. The ESDV was installed at 400 m from FPSO-MLS, in a water depth of 1.137 m. This method shall be used broadly by the company in the implantation of the new units of Campos' Basin, and the upcoming studies must consider the gradual increase of the water depth in the new projects. This work will focus the technological development in this area, and one of its purposes is to foresee the future difficulties that can appear in the implantation of the production systems in deep and ultra-deep waters. (author)

  20. RFQ Cooler and Buncher (and beam line section associated)

    CERN Document Server

    Podadera-Aliseda, I

    2003-01-01

    Developing a new RFQ cooler and buncher for ISOLDE. Such a device combines an energy loss in buffer gas atom-ion collisions with confinement provided by RF-field in transverse plane. Optional confinement in longitudinal direction is provided by static potential dwell. Then, an improvement of the beam line is achieved for all the experiments at ISOLDE. The RFQ operates inside a high voltage cage of 60 kV, and with a system of turbomulecular pumps both to keep the high vacuum before/after the RFQ and to keep a low pressure (around 0,1 mbar) inside the RFQ. The project is to be thought not only as a mechanical design and construction project, unless as a project of research and development, since it is about improving (operationally and technically) the existing RFQ cooler and buncher placed around the world. Due to ion optical reasons whole beam line section has to be redesigned and constructed as a part of this project.