WorldWideScience

Sample records for technology operating plans

  1. National Security Technology Incubator Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-04-30

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  2. Research and technology operating plan summary: Fiscal year 1975 research and technology program. [space programs, energy technology, and aerospace sciences

    Science.gov (United States)

    1975-01-01

    Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.

  3. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    Energy Technology Data Exchange (ETDEWEB)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  4. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  5. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  6. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  7. Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

    Science.gov (United States)

    Hornstein, Rhoda S.; Wunderlich, Dana A.; Willoughby, John K.

    1992-01-01

    New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

  8. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  9. Applying 3D-printing technology in planning operations of cancer patients

    Science.gov (United States)

    Kashapov, L. N.; N, A. N. Rudyk A.; Kashapov, R. N.

    2014-12-01

    The purpose of this work was creation 3D model of the front part of the skull of the patient and evaluates the effectiveness of its use in the planning of the operation. To achieve this goal was chosen an operation to remove a tumor of the right eyelid, germinate in the zygomatic bone. 3D printing was performed at different peripheral devices using the method of layering creating physical objects by a digital 3D model as well as the recovery model of the skull with the entire right malar bone for fixation on her titanium frame to maintain the eyeball in a fixed state.

  10. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  11. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  12. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  13. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  14. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  15. Operation plan : Alviso System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the operation plan for ponds A2W, A3W, A7, A14, and A16 in the Alviso System at San Francisco Bay NWR Complex. Operating instructions for both winter and...

  16. Graphite technology development plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-07-01

    This document presents the plan for the graphite technology development required to support the design of the 350 MW(t) Modular HTGR within the US National Gas-Cooled Reactor Program. Besides descriptions of the required technology development, cost estimates, and schedules, the plan also includes the associated design functions and design requirements.

  17. Graphite Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. Windes; T. Burchell; R. Bratton

    2007-09-01

    This technology development plan is designed to provide a clear understanding of the research and development direction necessary for the qualification of nuclear grade graphite for use within the Next Generation Nuclear Plant (NGNP) reactor. The NGNP will be a helium gas cooled Very High Temperature Reactor (VHTR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Considerable effort will be required to ensure that the graphite performance is not compromised during operation. Based upon the perceived requirements the major data needs are outlined and justified from the perspective of reactor design, reatcor performance, or the reactor safety case. The path forward for technology development can then be easily determined for each data need. How the data will be obtained and the inter-relationships between the experimental and modeling activities will define the technology development for graphite R&D. Finally, the variables affecting this R&D program are discussed from a general perspective. Factors that can significantly affect the R&D program such as funding, schedules, available resources, multiple reactor designs, and graphite acquisition are analyzed.

  18. Technology Planning Strategies

    Science.gov (United States)

    Decker, Kathy

    2004-01-01

    Effective planning strategies drive achievement of an overall technology goal to increase access to electronic information in real time in order to increase efficiency, productivity, and communication across campus. Planning relies on providing access, 'Anytime Anywhere' to student information, calendar, email, course management tools, and the…

  19. Operations planning with VERT.

    Science.gov (United States)

    Moeller, G L; Digman, L A

    1981-01-01

    The Venture Evaluation and Review Technique (VERT) is a computerized, mathematically oriented network-based simulation technique designed to analyze risk existing in three parameters of most concern to managers in new projects or ventures--time, cost, and performance. As such, the VERT technique is more powerful than techniques such as GERT, which are basically time and cost oriented. VERT has been successfully utilized to assess the risks involved in new ventures and projects, in the estimation of future capital requirements, in control monitoring, and in the overall evaluation of ongoing projects, programs, and systems. It has been helpful to management in cases where there is a requirement to make decisions with incomplete or inadequate information about the alternatives. An example describing the application of VERT to an operational planning problem--the evaluation of electric power generating methods--is illustrated.

  20. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  1. Conduct of operations implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  2. Technology Alignment and Portfolio Prioritization (TAPP): Advanced Methods in Strategic Analysis, Technology Forecasting and Long Term Planning for Human Exploration and Operations, Advanced Exploration Systems and Advanced Concepts

    Science.gov (United States)

    Funaro, Gregory V.; Alexander, Reginald A.

    2015-01-01

    The Advanced Concepts Office (ACO) at NASA, Marshall Space Flight Center is expanding its current technology assessment methodologies. ACO is developing a framework called TAPP that uses a variety of methods, such as association mining and rule learning from data mining, structure development using a Technological Innovation System (TIS), and social network modeling to measure structural relationships. The role of ACO is to 1) produce a broad spectrum of ideas and alternatives for a variety of NASA's missions, 2) determine mission architecture feasibility and appropriateness to NASA's strategic plans, and 3) define a project in enough detail to establish an initial baseline capable of meeting mission objectives ACO's role supports the decision­-making process associated with the maturation of concepts for traveling through, living in, and understanding space. ACO performs concept studies and technology assessments to determine the degree of alignment between mission objectives and new technologies. The first step in technology assessment is to identify the current technology maturity in terms of a technology readiness level (TRL). The second step is to determine the difficulty associated with advancing a technology from one state to the next state. NASA has used TRLs since 1970 and ACO formalized them in 1995. The DoD, ESA, Oil & Gas, and DoE have adopted TRLs as a means to assess technology maturity. However, "with the emergence of more complex systems and system of systems, it has been increasingly recognized that TRL assessments have limitations, especially when considering [the] integration of complex systems." When performing the second step in a technology assessment, NASA requires that an Advancement Degree of Difficulty (AD2) method be utilized. NASA has used and developed or used a variety of methods to perform this step: Expert Opinion or Delphi Approach, Value Engineering or Value Stream, Analytical Hierarchy Process (AHP), Technique for the Order of

  3. Strategic Planning for Information Technology.

    Science.gov (United States)

    Bates, Iain

    1990-01-01

    Emphasizes the necessity for libraries to implement strategic planning for information technology. Topics discussed include assessing strengths and weaknesses; the allocation of resources; an OCLC report that surveyed member libraries to determine their planning activities; long-range planning; the need for flexibility; integrating planning with…

  4. Technology Planning: Thinking Strategically for Planning.

    Science.gov (United States)

    Westbrook, Kathleen C.

    1993-01-01

    Sound educational planning is essential in an era faced with declining resources, increasing accountability demands, and reluctance to fund higher taxation requests. Planners are seriously challenged by shift from an industrial to a paperless, technological society. This article compares long-range and strategic planning approaches, describes…

  5. Graphite Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. Windes; T. Burchell; M.Carroll

    2010-10-01

    The Next Generation Nuclear Plant (NGNP) will be a helium-cooled High Temperature Gas Reactor (HTGR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Graphite has been used effectively as a structural and moderator material in both research and commercial high-temperature gas-cooled reactors. This development has resulted in graphite being established as a viable structural material for HTGRs. While the general characteristics necessary for producing nuclear grade graphite are understood, historical “nuclear” grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermomechanical design of the structural graphite in NGNP is based. This Technology Development Plan outlines the research and development (R&D) activities and associated rationale necessary to qualify nuclear grade graphite for use within the NGNP reactor.

  6. Emerging technologies planning guide, 1993 edition

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    Information system technology enhancements during the next five years are expected to provide some of the most significant individual and organization work improvements ever made in the office environment. This guide is an aid to planning these technologies and assessing their roles in improving the effectiveness of Headquarters programs. Their implementation will cost-effectively support Departmental operations and the National Energy Strategy. At the hear of this process is an understanding of the relationship which exists between technology introduction and the planning, budgeting and acquisition process. The 1993 edition of this guide covers the 1993--1997 time frame.

  7. Synchronizing Federal Operational Planning for National Catastrophes

    Science.gov (United States)

    2010-03-01

    63 1. Ireland: The Planning Uber -Department .............................. 63 2. Canada: Collaboration with Muscle...The Planning Uber -Department The Ireland National Government makes a clear distinction between planning and operations. The Minister of Defense (MOD...the federal planning system. The Irish model of an “ Uber -Department” for planning and the Canadian model of a department in charge of both operations

  8. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  9. 36 CFR 228.56 - Operating plans.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Operating plans. 228.56... Disposal of Mineral Materials General Provisions § 228.56 Operating plans. Any surface-disturbing operation... of an operating plan and to reasonable conditions as may be required to ensure proper protection of...

  10. Development of Remote Operations Technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Ji Sub; Kwon, Sung Gyu; Kim, Ki Ho; Park, Byung Suk; Park Young Soo; Lee, Won Sang [Korea Atomic Energry Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    To control the swing of the load suspended to overhead crane, various devices, anti-swing control algorithms, and experimental and pilot-scaled cranes have been developed since 1989. In this year, the problems of control algorithm are identified and new algorithms which adopt an acceleration profile planning, a velocity feedback control, a fuzzy control, and an anti-swing/position control methods are developed. Also, the report includes the program of transferring the anti-swing overhead crane technology to industry. And, to improve the cask handling safety and to increase the cask handling capacity of a facility, a Remote Cask Grappling and Lid Unbolting Device (RCG=LUD) which is suspended to an anti-swing crane and remotely controlled to hold the cask and unbolt the cask lid is developed. the controller using PMAC is tested for successful remote operations. Technology for this device has the potential for developing other technologies, such as nuclear reactor maintenance and repair. 62 refs., 73 figs., 27 tabs.

  11. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  12. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  13. Web Design for Space Operations: An Overview of the Challenges and New Technologies Used in Developing and Operating Web-Based Applications in Real-Time Operational Support Onboard the International Space Station, in Astronaut Mission Planning and Mission Control Operations

    Science.gov (United States)

    Khan, Ahmed

    2010-01-01

    The International Space Station (ISS) Operations Planning Team, Mission Control Centre and Mission Automation Support Network (MAS) have all evolved over the years to use commercial web-based technologies to create a configurable electronic infrastructure to manage the complex network of real-time planning, crew scheduling, resource and activity management as well as onboard document and procedure management required to co-ordinate ISS assembly, daily operations and mission support. While these Web technologies are classified as non-critical in nature, their use is part of an essential backbone of daily operations on the ISS and allows the crew to operate the ISS as a functioning science laboratory. The rapid evolution of the internet from 1998 (when ISS assembly began) to today, along with the nature of continuous manned operations in space, have presented a unique challenge in terms of software engineering and system development. In addition, the use of a wide array of competing internet technologies (including commercial technologies such as .NET and JAVA ) and the special requirements of having to support this network, both nationally among various control centres for International Partners (IPs), as well as onboard the station itself, have created special challenges for the MCC Web Tools Development Team, software engineers and flight controllers, who implement and maintain this system. This paper presents an overview of some of these operational challenges, and the evolving nature of the solutions and the future use of COTS based rich internet technologies in manned space flight operations. In particular this paper will focus on the use of Microsoft.s .NET API to develop Web-Based Operational tools, the use of XML based service oriented architectures (SOA) that needed to be customized to support Mission operations, the maintenance of a Microsoft IIS web server onboard the ISS, The OpsLan, functional-oriented Web Design with AJAX

  14. Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nimmons, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-09-01

    A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops-Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

  15. Information Technology Strategic Plan 2009-2013

    Science.gov (United States)

    2009-01-01

    Information Technology (IT) Strategic Plan outlines how the Department of Homeland Security (DHS) Office of the Chief Information Officer (OCIO) will support DHS’ mission objectives and goals. It reflects DHS? commitment to focus IT resources on moving forward high-priority operational capabilities, programs, and business processes. The plan articulates DHS IT priorities for developing and delivering capabilities and services to support the mission and business needs of the Department. The IT Strategic Plan for FY2009-2013 was developed collectively by the DHS Chief

  16. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ... Federal Energy Regulatory Commission 18 CFR Part 376 Continuity of Operations Plan AGENCY: Federal Energy... Continuity of Operations Plan regulations to revise its hierarchy of delegation of Commission authority... Rule revises the Commission's Continuity of Operations Plan (COOP) regulations to incorporate...

  17. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  18. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  19. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  20. Operation plan : Baumberg Complex Pond System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Operations Plan describes the management activities required to meet the overall goals and objectives described in the Initial Stewardship Plan (ISP) and the...

  1. Richland Operations Office technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  2. National Ignition Facility (NIF) operations procedures plan

    Energy Technology Data Exchange (ETDEWEB)

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  3. National Security Technology Incubator Business Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-31

    This document contains a business plan for the National Security Technology Incubator (NSTI), developed as part of the National Security Preparedness Project (NSPP) and performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This business plan describes key features of the NSTI, including the vision and mission, organizational structure and staffing, services, evaluation criteria, marketing strategies, client processes, a budget, incubator evaluation criteria, and a development schedule. The purpose of the NSPP is to promote national security technologies through business incubation, technology demonstration and validation, and workforce development. The NSTI will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The vision of the NSTI is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety, security, and protection of the homeland. The NSTI is operated and managed by the Arrowhead Center, responsible for leading the economic development mission of New Mexico State University (NMSU). The Arrowhead Center will recruit business with applications for national security technologies recruited for the NSTI program. The Arrowhead Center and its strategic partners will provide business incubation services, including hands-on mentoring in general business matters, marketing, proposal writing, management, accounting, and finance. Additionally, networking opportunities and technology development assistance will be provided.

  4. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M.M.; Nepomuceno, L.; Teixeira, J.C.F.; Santos Junior, A. [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  5. 47 CFR 54.508 - Technology plans.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Technology plans. 54.508 Section 54.508... SERVICE Universal Service Support for Schools and Libraries § 54.508 Technology plans. (a) Contents. The technology plans referred to in this subpart must include the following five elements: (1) A clear...

  6. Automated transit planning, operation, and applications

    CERN Document Server

    Liu, Rongfang

    2016-01-01

    This book analyzes the successful implementations of automated transit in various international locations, such as Paris, Toronto, London, and Kuala Lumpur, and investigates the apparent lack of automated transit applications in the urban environment in the United States. The book begins with a brief definition of automated transit and its historical development. After a thorough description of the technical specifications, the author highlights a few applications from each sub-group of the automated transit spectrum. International case studies display various technologies and their applications, and identify vital factors that affect each system and performance evaluations of existing applications. The book then discusses the planning and operation of automated transit applications at both macro and micro levels. Finally, the book covers a number of less successful concepts, as well as the lessons learned, allow ng readers to gain a comprehensive understanding of the topic.

  7. Planning and Operation of Commercial Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Kye Ryung; Lee, Tae Joon; Lee, Jae Hyeong; Park, Je Won; Lee, Jae Sang

    2003-06-15

    The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.

  8. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  9. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne L.

    2017-08-23

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  10. Chicago Operations Office: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  11. Quayside Operations Planning Under Uncertainty

    DEFF Research Database (Denmark)

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP......).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random. In this study, we present a stochastic programming approach based on a decomposition algorithm to solve...

  12. GIS, Information Technology and Spatial Planning

    Directory of Open Access Journals (Sweden)

    K. Maier

    2003-01-01

    Full Text Available  Geographic information systems have been introduced local and regional planning several stages. They have influenced the technique of planning but only to a lesser extent the procedures of planning and the methodology of plan-making. More recently, information technology has challenged the whole concept of planning as an expert-and-government interplay. However, legal frameworks have not reflected the substantial change in the potentials of the technology.Any effort to reflect the new technology will face not only institutional inertia but increasingly also the human capacity of users of planning (i.e., decision-makers, administrators, stakeholders, namely the limited extent of overall IT literacy, which restricts the possible benefits of the technology. The dimension of access to and empowerment in planning may reappear in the context of new technologies, with new professional requirements for planners, beyond the computer, GIS and information technology.

  13. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  14. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, E.W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access t

  15. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  16. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...... and waste utilization potential of IS....

  17. Payload software technology: Software technology development plan

    Science.gov (United States)

    1977-01-01

    Programmatic requirements for the advancement of software technology are identified for meeting the space flight requirements in the 1980 to 1990 time period. The development items are described, and software technology item derivation worksheets are presented along with the cost/time/priority assessments.

  18. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  19. Development planning and appropriate technology: a dilemma and a proposal

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, G.

    1981-03-01

    This paper examines the present system of project paper preparation and project planning used by the US Agency for International Development and many donor agencies. Three approaches for meeting the evident weaknesses of the system - a holistic approach to the planning problem, an operant-conditioning approach to implementation, and a process approach to planning and implementation - are presented and critiqued. On the basis of the critique, an approach grounded in a search for an approximately appropriate technology is supported; and a proposal for an appropriate-technology evaluation system which would analyze alternative technologies, deliver information to the field level, supply needed information on technologies and implementation, constrain donor planners, reduce lag time, incorporate evaluations into future planning, and reduce dependence upon planners is presented. 66 references.

  20. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  1. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  2. Safeguards Technology Strategic Planning Pentachart

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, C. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-05-25

    Builds on earlier strategic planning workshops conducted for SGIT, SGTS, and SGCP. Many of recommendations from these workshops have been successfully implemented at the IAEA. Provide a context for evaluating new approaches for anticipated safeguards challenges of the future. Approach used by government and military to plan for an uncertain future. Uses consensus decision-making.

  3. Project Management Plan for the INEL technology logic diagrams

    Energy Technology Data Exchange (ETDEWEB)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  4. Project Management Plan for the INEL technology logic diagrams

    Energy Technology Data Exchange (ETDEWEB)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  5. The development of radiation hardened tele-robot system - Development of path-planning and control technology for tele-operated redundant manipulator

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Pyung Hun; Park, Ki Cheol; Park, Suk Ho [Korea Advanced Institute of Science and Technology, Taejon (Korea)

    1999-04-01

    This project focuses on the development of the control system for a teleoperated redundant manipulator, which performs many tasks dexterously, while avoiding obstacles, instead of human workers in the extreme situations like nuclear power plants. To this end, four consecutive research works have been performed. First, two new methods for global path-planning have been developed to inspect the global behavior of the redundant manipulator. Second, characteristics of optimal solutions(COS) under inequality constraints have been analyzed and, using the COS, how to greatly enhance the conventional redundancy resolution methods in terms of performance and repeatability has also been proposed. Third, an effective control method for a redundant manipulator has been developed, which incorporates all kinds of physical limits into practical inequality constraints and is computationally efficient for real-time purposes. Finally, using this control method as the controller of the slave redundant manipulator and developing a master manipulator, the inertial torque and gravitation torque of which are negligible, a force-reflected teleoperation control system has been developed. Through the teleoperation control system, human operator can accurately control the position and the force of the end-effector of the slave manipulator while feeling the interaction force between the slave and the workpiece. In addition, the slave redundant manipulator autonomously can control the impedance and can optimize a given performance measure while avoiding physical limits such as joint angle limits and obstacles. 49 refs., 43 figs., 10 tabs. (Author)

  6. Technology for Democracy in Smart City Planning

    Directory of Open Access Journals (Sweden)

    Paolo De Pascali

    2014-02-01

    Full Text Available In recent history the relationship between technology and urban planning has been variously taken into account (and possibly also undervalued, but lately it has come into focus with the maturation ofthe concept of the Smart City. Building on an analysis of documents dealing with the issue andcurrent experiences, this paper tries to determine which opportunity factors the new technologies are offering for the improvement of urban planning. In particular it considers how these technologies arebeing integrated into the processes of participatory planning thus supporting the development of direct democracy. The resulting complex framework suggests four main fields of application where the new technologies can contribute to addressing contents and governance of the plan for an urban organisation that enhances virtuous behaviours and steers the town’s residents towardsadopting them.

  7. Bringing Urban Schools into the Information Age: Planning for Technology vs. Technology Planning.

    Science.gov (United States)

    Fishman, Barry J.; Pinkard, Nichole

    2001-01-01

    Describes the pitfalls that school technology planning processes can engender and presents an improved model for planning for the use of technology in K-12 schools. Emphasizes the secondary nature of technology in relation to other considerations, such as curriculum and pedagogy, and presents a case study in an urban K-8 school. (Author/LRW)

  8. A Technology Plan That Works

    Science.gov (United States)

    Overbay, Amy; Mollette, Melinda; Vasu, Ellen S.

    2011-01-01

    Digital learners are hungry to use technology in school. And many schools are responding by delivering cutting-edge equipment to all teachers and students and infusing this technology into instruction. This is all well and good. But as evaluators with the Friday Institute for Educational Innovation, the authors have observed several major…

  9. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  10. 36 CFR 228.106 - Operator's submission of surface use plan of operations.

    Science.gov (United States)

    2010-07-01

    ... supplemental plan of operations is submitted. The supplemental plan of operations need only address those... surface use plan of operations. 228.106 Section 228.106 Parks, Forests, and Public Property FOREST SERVICE....106 Operator's submission of surface use plan of operations. (a) General. No permit to drill on...

  11. A Technology Plan for Enabling Commercial Space Business

    Science.gov (United States)

    Lyles, Garry M.

    1997-01-01

    The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems

  12. Guiding Questions for Technology Planning. Version 1.0.

    Science.gov (United States)

    Knuth, Randy, Ed.; Hopey, Chris, Ed.

    This publication, intended for administrators and technology planning teams in a wide range of educational settings, presents a set of guiding questions for technology planning that is both supported by current research and found in exemplary technology plans. The guide will help technology planning teams to start and guide a technology planning…

  13. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed... methods to be applied in controlling the adverse effects of blasting operations. (b) Monitoring...

  14. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  15. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  16. New technology integration planning workshop

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Purpose of the Workshop was to provide guidance, reflecting electric utility industry viewpoints, for developing and directing its research and development program structures to facilitate the integration of new energy technologies into electric utility systems. The Workshop was structured to directly elicit the positions and viewpoints representative of electric utility companies.

  17. Open Technology Development: Roadmap Plan

    Science.gov (United States)

    2006-04-01

    Linux Apache MySql (PHP/ Perl /Python) integrated services. This standardized "stack" of open source technologies enables robust web based information...ACTD Office • Sue Payton, AS&C Office • LTG Robert M. Shea, Joint Staff, J-6 • David Scantling, OSD, Business Transformation Office • Fritz

  18. Information technology strategic planning: art or science?

    Science.gov (United States)

    Hutsell, Richard; Mancini-Newell, Lulcy

    2005-01-01

    It had been almost a decade since the hospitals that make up the Daughters of Charity Health System (DCHS) had engaged in a formal information technology strategic planning process. In the summer of 2002, as the health system re-formed, there was a unique opportunity to introduce a planning process that reflected the governance style of the new health system. DCHS embarked on this journey, with the CIO initiating and formally sponsoring the information technology strategic planning process in a dynamic and collaborative manner The system sought to develop a plan tailored to encompass both enterprise-wide and local requirements; to develop a governance model to engage the members of the local health ministries in plan development, both now and in the future; and to conduct the process in a manner that reflected the values of the Daughters of Charity. The DCHS CIO outlined a premise that the CIO would guide and be continuously involved in the development of this tailored process, in conjunction with an external resource. Together, there would be joint responsibility for introducing a flexible information technology strategic planning methodology; providing an education on the current state of healthcare IT, including future trends and success factors; facilitating support to tap into existing internal talent; cultivating a collaborative process to support both current requirements and future vision; and developing a well-functioning governance structure that would enable the plan to evolve and reflect user community requirements. This article highlights the planning process, including the lessons learned, the benchmarking during and in post-planning, and finally, but most importantly, the unexpected benefit that resulted from this planning process.

  19. Decision support software technology demonstration plan

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN,T.; ARMSTRONG,A.

    1998-09-01

    The performance evaluation of innovative and alternative environmental technologies is an integral part of the US Environmental Protection Agency's (EPA) mission. Early efforts focused on evaluating technologies that supported the implementation of the Clean Air and Clean Water Acts. In 1986 the Agency began to demonstrate and evaluate the cost and performance of remediation and monitoring technologies under the Superfund Innovative Technology Evaluation (SITE) program (in response to the mandate in the Superfund Amendments and Reauthorization Act of 1986 (SARA)). In 1990, the US Technology Policy was announced. This policy placed a renewed emphasis on making the best use of technology in achieving the national goals of improved quality of life for all Americans, continued economic growth, and national security. In the spirit of the technology policy, the Agency began to direct a portion of its resources toward the promotion, recognition, acceptance, and use of US-developed innovative environmental technologies both domestically and abroad. Decision Support Software (DSS) packages integrate environmental data and simulation models into a framework for making site characterization, monitoring, and cleanup decisions. To limit the scope which will be addressed in this demonstration, three endpoints have been selected for evaluation: Visualization; Sample Optimization; and Cost/Benefit Analysis. Five topics are covered in this report: the objectives of the demonstration; the elements of the demonstration plan; an overview of the Site Characterization and Monitoring Technology Pilot; an overview of the technology verification process; and the purpose of this demonstration plan.

  20. Network operating system focus technology

    Science.gov (United States)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  1. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  2. Task 9. Deployment of photovoltaic technologies: co-operation with developing countries. PV for rural electrification in developing countries - Programme design, planning and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Parker, W. [Institute for Sustainable Power, Highlands Ranch, CO (United States); Oldach, R.; Wilshaw, A. [IT Power Ltd, The Manor house, Chineham (United Kingdom)

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme takes a look at the design, planning and implementation of PV programmes. The guide contains details on the preparation for PV programmes, including the assessment of needs, stakeholder consultation, social context analysis, supply options and national policy considerations. The establishment of goals, delivery modes, timelines, logistics and quality assurance are discussed. Further, the implementation, monitoring and evaluation of PV programmes is discussed, as are a number of methodologies that have been developed with the aim of improving programme design and implementation. The guide highlights issues pertinent to rural energy programmes in developing countries and leads programme administrators through the process of planning, implementing and evaluating a PV programme.

  3. KSC Education Technology Research and Development Plan

    Science.gov (United States)

    Odell, Michael R. L.

    2003-01-01

    Educational technology is facilitating new approaches to teaching and learning science, technology, engineering, and mathematics (STEM) education. Cognitive research is beginning to inform educators about how students learn providing a basis for design of more effective learning environments incorporating technology. At the same time, access to computers, the Internet and other technology tools are becoming common features in K-20 classrooms. Encouraged by these developments, STEM educators are transforming traditional STEM education into active learning environments that hold the promise of enhancing learning. This document illustrates the use of technology in STEM education today, identifies possible areas of development, links this development to the NASA Strategic Plan, and makes recommendations for the Kennedy Space Center (KSC) Education Office for consideration in the research, development, and design of new educational technologies and applications.

  4. 75 FR 71464 - Metlife Technology, Operations, and Information Technology Groups Including On-Site Leased...

    Science.gov (United States)

    2010-11-23

    ... Employment and Training Administration Metlife Technology, Operations, and Information Technology Groups... Moosic, PA, Metlife Technology, Operations, and Information Technology Groups Including On-Site Leased... of MetLife, Technology, Operations, and Information Technology Groups, Moosic, Pennsylvania...

  5. Measuring Information Technology Performance: Operational Efficiency and Operational Effectiveness

    Science.gov (United States)

    Moore, Annette G.

    2012-01-01

    This dissertation provides a practical approach for measuring operational efficiency and operational effectiveness for IT organizations introducing the ITIL process framework. The intent of the study was to assist Chief Information Officers (CIOs) in explaining the impact of introducing the Information Technology Infrastructure Library (ITIL)…

  6. Measuring Information Technology Performance: Operational Efficiency and Operational Effectiveness

    Science.gov (United States)

    Moore, Annette G.

    2012-01-01

    This dissertation provides a practical approach for measuring operational efficiency and operational effectiveness for IT organizations introducing the ITIL process framework. The intent of the study was to assist Chief Information Officers (CIOs) in explaining the impact of introducing the Information Technology Infrastructure Library (ITIL)…

  7. DoD Key Technologies Plan

    Science.gov (United States)

    1992-07-01

    assurance (including fonnal models of critica ! properties, composability of models, formal specification languages, formal reasoning techniques, and...Integrated crisis action planning tools and military wargames 7 Technology -See Row I above *Computer supported ’Acquisition manager’s associate frx

  8. National Security Technology Incubator Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  9. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS COMMERCIAL AIR TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Air Tour Safety Standards § 136.13 Helicopter performance plan and operations. (a) Each operator must complete a performance plan before...

  10. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  11. Water Treatment Technology - General Plant Operation.

    Science.gov (United States)

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on general plant operations provides instructional materials for seven competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: water supply regulations, water plant…

  12. [From national strategic plans to operational implementation: opportunities and risks].

    Science.gov (United States)

    Etchepare, M

    2013-01-01

    Currently, all countries in Africa are - to various degrees - involved in reform and planning programs, either because they chose to or at the behest of international institutions working with them. Here we present an operational definition of a strategic plan and then analyze the factors that promote and constrain the planning process and the implementation of the plan thus developed.

  13. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  14. Planning and Conducting Offensive Counterinformation Operations

    Science.gov (United States)

    2002-04-01

    doctrine calls this special information operations (SIO)) which precludes timely data sharing and collaboration amongst the proper experts, planners, and...is classified as special information operations. Offensive information operations are conducted across the range of military operations while...Operations RF Radio Frequency ROE Rules of Engagement SecDef Secretary of Defense SIO Special Information Operations SOF Special Operations Force

  15. Advanced Multimission Operations Systems Tech (AMMOS) Technology Project

    Data.gov (United States)

    National Aeronautics and Space Administration — AMMOS Technology tasks include: - Enhance mission planning and sequence generation tools with constraint based automated planning and scheduling techniques to enable...

  16. Information technology planning: critical for implementing advanced manufacturing automation

    Energy Technology Data Exchange (ETDEWEB)

    Devine, M.; Brogden, I. [EDS Canada Management Consulting Services, Whitby, ON (Canada)

    1994-12-31

    The paper describes the major components of information technology planning that, although developed for manufacturing companies, apply to mining companies. The major components of a fully integrated plan are discussed: strategic business planning, business process reengineering, corporate technology policy, application planning, information and data planning, infrastructure planning, and resource management. The factors that are critical to the success of information technology planning are discussed. Effective management for change must consider the following key components: corporate strategy, organizational structure, business process, people, culture, and technology. 12 refs., 5 figs., 1 tab.

  17. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  18. UAVSAR Instrument: Current Operations and Planned Upgrades

    Science.gov (United States)

    Lou, Yunling; Hensley, Scott; Chao, Roger; Chapin, Elaine; Heavy, Brandon; Jones, Cathleen; Miller, Timothy; Naftel, Chris; Fratello, David

    2011-01-01

    The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based Lband polarimetric synthetic aperture radar (SAR), specifically designed to acquire airborne repeat track SAR data for differential interferometric measurements. This instrument is currently installed on the NASA Gulfstream- III (G-III) aircraft with precision real-time Global Positioning System (GPS) and a sensor-controlled flight management system for precision repeat-pass data acquisitions. UAVSAR has conducted engineering and preliminary science data flights since October 2007 on the G-III. We are porting the radar to the Global Hawk Unmanned Airborne Vehicle (UAV) to enable long duration/long range data campaigns. We plan to install two radar pods (each with its own active array antenna) under the wings of the Global Hawk to enable the generation of precision topographic maps and single pass polarimetric-interferometry (SPI) providing vertical structure of ice and vegetation. Global Hawk's range of 8000 nm will enable regional surveys with far fewer sorties as well as measurements of remote locations without the need for long and complicated deployments. We are also developing P-band polarimetry and Ka-band single-pass interferometry capabilities on UAVSAR by replacing the radar antenna and front-end electronics to operate at these

  19. A model technology transfer program for independent operators

    Energy Technology Data Exchange (ETDEWEB)

    Schoeling, L.G.

    1996-08-01

    In August 1992, the Energy Research Center (ERC) at the University of Kansas was awarded a contract by the US Department of Energy (DOE) to develop a technology transfer regional model. This report describes the development and testing of the Kansas Technology Transfer Model (KTTM) which is to be utilized as a regional model for the development of other technology transfer programs for independent operators throughout oil-producing regions in the US. It describes the linkage of the regional model with a proposed national technology transfer plan, an evaluation technique for improving and assessing the model, and the methodology which makes it adaptable on a regional basis. The report also describes management concepts helpful in managing a technology transfer program.

  20. Optimizing Long-Term Capital Planning for Special Operations Forces

    Science.gov (United States)

    2015-06-01

    TERM CAPITAL PLANNING FOR SPECIAL OPERATIONS FORCES by Gretchen M. Radke June 2015 Thesis Advisor: Emily Craparo Co-Advisor: Jonathan Alt...REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE OPTIMIZING LONG-TERM CAPITAL PLANNING FOR SPECIAL OPERATIONS FORCES 5...words) The United States Special Operations Command (USSOCOM) J8 directorate is responsible for planning long-range capital expenditure for Special

  1. Autonomous System Technologies for Resilient Airspace Operations

    Science.gov (United States)

    Houston, Vincent E.; Le Vie, Lisa R.

    2017-01-01

    Increasing autonomous systems within the aircraft cockpit begins with an effort to understand what autonomy is and developing the technology that encompasses it. Autonomy allows an agent, human or machine, to act independently within a circumscribed set of goals; delegating responsibility to the agent(s) to achieve overall system objective(s). Increasingly Autonomous Systems (IAS) are the highly sophisticated progression of current automated systems toward full autonomy. Working in concert with humans, these types of technologies are expected to improve the safety, reliability, costs, and operational efficiency of aviation. IAS implementation is imminent, which makes the development and the proper performance of such technologies, with respect to cockpit operation efficiency, the management of air traffic and data communication information, vital. A prototype IAS agent that attempts to optimize the identification and distribution of "relevant" air traffic data to be utilized by human crews during complex airspace operations has been developed.

  2. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  3. Microeconomics, Private Security, and the Significance to Operational Planning

    Science.gov (United States)

    2013-05-23

    MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING A Monograph by MAJ Kevin S. Clarke United... MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...of microeconomic principles of supply-demand theory by looking at specific conceptual variables to determine the relationship and influence on the

  4. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13 Wetlands reserve plan of operations. (a) After NRCS has accepted the applicant for enrollment in the...

  5. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance planning document requirements (HIT PAPD). 495.336 Section 495.336 Public Health CENTERS FOR MEDICARE... Medicaid Program § 495.336 Health information technology planning advance planning document...

  6. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  7. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  8. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  9. 2010 Cooperative Initial Attack Annual Operating Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective of this plan is to provide a pre-approved system to coordinate efforts and exchange or utilize resources for the prevention, detection, and...

  10. Business Plan Competition open for CERN technologies

    CERN Multimedia

    TT Helpdesk

    2005-01-01

    Helping researchers turn great research into great business - that's the aim of the UK Research Council's Business Plan Competition. Every good business starts with two things: a good idea and a robust business plan. You supply the idea, and we'll give you the skills, knowledge and support you need to develop a first-rate business plan! This will be provided through expert trainers, coaches and mentors. Plus - the opportunity to win funds to help with the development of your business idea. The competition is open to researchers at CERN, promoted and supported by PPARC, together with the whole spectrum of academic research supported by the eight UK Research Councils - from the arts and biosciences, to environmental physical and social sciences to technology. Postgraduates, postdocs and academic staff who have a business idea arising from research and want to develop this further are encouraged to participate. Taking part is easy - just contact the TT group (TT Helpdesk) for details and support before 16 D...

  11. Running PILOT: operational challenges and plans for an Antarctic Observatory

    Science.gov (United States)

    McGrath, Andrew; Saunders, Will; Gillingham, Peter; Ward, David; Storey, John; Lawrence, Jon; Haynes, Roger

    2008-07-01

    We highlight the operational challenges and planned solutions faced by an optical observatory taking advantage of the superior astronomical observing potential of the Antarctic plateau. Unique operational aspects of an Antarctic optical observatory arise from its remoteness, the polar environment and the unusual observing cycle afforded by long continuous periods of darkness and daylight. PILOT is planned to be run with remote observing via satellite communications, and must overcome both limited physical access and data transfer. Commissioning and lifetime operations must deal with extended logistics chains, continual wintertime darkness, extremely low temperatures and frost accumulation amidst other challenging issues considered in the PILOT operational plan, and discussed in this presentation.

  12. Idaho Operations Office: Technology summary, June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  13. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  14. The European Strategic Energy Technology (SET-Plan); PLan estrategico Europeo de Tecnologia energetica (Plan EETE)

    Energy Technology Data Exchange (ETDEWEB)

    Liberali, R.

    2010-07-01

    Rafael Liberal i was appointed Director for Energy within the Directorate-General Research of the European Commission in October 2006. He is in charge of the implementation of the Non-Nuclear Energy priority of the 7th Framework Programme, as well as the definition of political priorities and coordination with Member States and research/industrial stake holders in the field of non-nuclear energy technologies, including the definition and implementation of the Strategic Energy Technology Plan (SET-Plan). (Author)

  15. Tank waste remediation system integrated technology plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P. [eds.] [Pacific Northwest Lab., Richland, WA (United States)

    1995-02-28

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m{sup 3} (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program.

  16. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    Energy Technology Data Exchange (ETDEWEB)

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  17. Method for measuring the alignment between information technology strategic planning and actions of information technology governance

    National Research Council Canada - National Science Library

    Silva, Lúcio Melre da; Souza Neto, João

    2014-01-01

    The purpose of this research is to present a method for measuring the degree of alignment between Strategic Planning and Information Technology Management practices and Information Technology Governance...

  18. Method for Measuring the Alignment Between Information Technology Strategic Planning and Actions of Information Technology Governance

    National Research Council Canada - National Science Library

    Lúcio Melre da Silva; João Souza Neto

    2014-01-01

    The purpose of this research is to present a method for measuring the degree of alignment between Strategic Planning and Information Technology Management practices and Information Technology Governance...

  19. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  20. Technological Research and Development Plan 1999-2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The present document summarises the ENRESA Technological Research and Development Plan (1999-2003) for the radioactive waste management. The full version of this Plan is included in the ENRESA Technical Publications series corresponding to the year 1999. (Author)

  1. A Guide to Food Service Operation Planning with Information on Preparing and Submitting Plans and Specifications.

    Science.gov (United States)

    Ohio State Dept. of Health, Columbus.

    Guidelines are presented for planning a food service operation which is defined as any place kept or maintained for the purpose of preparing or serving meals or lunches for a consideration. Brief discussions are presented pertaining to the value of planning and the preparation and use of plans and specifications. Recommendations and specifications…

  2. Chemical sensors technology development planning workshop

    Energy Technology Data Exchange (ETDEWEB)

    Bastiaans, G.J.; Haas, W.J. Jr.; Junk, G.A. [eds.

    1993-03-01

    The workshop participants were asked to: (1) Assess the current capabilities of chemical sensor technologies for addressing US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) needs; (2) Estimate potential near term (one to two years) and intermediate term (three to five years) capabilities for addressing those needs; and (3) Generate a ranked list of specific recommendations on what research and development (R&D) should be funded to provide the necessary capabilities. The needs were described in terms of two pervasive EM problems, the in situ determination of chlorinated volatile organic compounds (VOCs), and selected metals in various matrices at DOE sites. The R&D recommendations were to be ranked according to the estimated likelihood that the product technology will be ready for application within the time frame it is needed and the estimated return on investment. The principal conclusions and recommendations of the workshop are as follows: Chemical sensors capable of in situ determinations can significantly reduce analytical costs; Chemical sensors have been developed for certain VOCs in gases and water but none are currently capable of in situ determination of VOCs in soils; The DOE need for in situ determination of metals in soils cannot be addressed with existing chemical sensors and the prospects for their availability in three to five years are uncertain; Adaptation, if necessary, and field application of laboratory analytical instruments and those few chemical sensors that are already in field testing is the best approach for the near term; The chemical sensor technology development plan should include balanced support for near- and intermediate-term efforts.

  3. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  4. Robust Planning for Effects-Based Operations

    Science.gov (United States)

    2006-06-01

    Force assets such as the Predator and Global Hawk 21 instead of the tactical uses of MAVs. The Air Force outlines its planning doctrine in Air Force...of UAVs. We have ISR UAVs (for example a Global Hawk), which we consider to be very good at performing ISR and have long range. We also model strike...ISR tasks per time-period for strike UAVs (A"isr) 2 ISR tasks per time-period for ISR UAVs (-y) 4 Figure 3-5. We solved the problem using Xpress Mosel

  5. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  6. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  7. Setting the right incentives for global planning and operations

    NARCIS (Netherlands)

    Norde, Henk; Ozen, Ulas; Slikker, Marco

    2016-01-01

    We study incentive issues seen in a firm performing global planning and manufacturing, and local demand management. The stochastic demands in local markets are best observed by the regional business units, and the firm relies on the business units’ forecasts for planning of global manufacturing oper

  8. Tank farms justification for continued operations 007 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  9. Operation Eclipse; Appreciation and Outline Plan

    Science.gov (United States)

    1945-04-25

    operation will1 be .made at’ the first opportunity to the .responsible Local Allied llilitary Coriander . ’ Telecorxiunications Sj^stems closed dorm on...34; Droi/ision of POL, etc., of Specialist personnel viicn they arrive in G3RI.i’ii’’IY, will be under ta,ken by the local Ground Force Coriander until

  10. Planning of the development of the MMIS core technology based on nuclear-IT convergence

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Kee Choon; Kim, Chang Hwoi; Hwang, In Koo [KAERI, Daejeon (Korea, Republic of); and others

    2012-01-15

    - Drive nuclear-IT convergence technologies such as middleware applied new concept nuclear instrumentation and control architecture, automated operation of future nuclear power plant, virtual reality/augmented reality, design and verification technology of a nuclear power plant main control room, software dependability, and cyber security technology - Write state-of-the-art report for the nuclear instrumentation and control based on IT convergence - A prototype which implemented related equipment and software subject to nuclear reactor operator that reside in the main control room (Reactor Operator, RO) order to a on-site operator (Local Operator, LO) and confirm the task performance matches the RO's intention - 'IT Convergence intelligent instrumentation and control technology' project planning for the Fourth Nuclear Power Research and Development in the long-term plan.

  11. Influence Diagram Use With Respect to Technology Planning and Investment

    Science.gov (United States)

    Levack, Daniel J. H.; DeHoff, Bryan; Rhodes, Russel E.

    2009-01-01

    Influence diagrams are relatively simple, but powerful, tools for assessing the impact of choices or resource allocations on goals or requirements. They are very general and can be used on a wide range of problems. They can be used for any problem that has defined goals, a set of factors that influence the goals or the other factors, and a set of inputs. Influence diagrams show the relationship among a set of results and the attributes that influence them and the inputs that influence the attributes. If the results are goals or requirements of a program, then the influence diagram can be used to examine how the requirements are affected by changes to technology investment. This paper uses an example to show how to construct and interpret influence diagrams, how to assign weights to the inputs and attributes, how to assign weights to the transfer functions (influences), and how to calculate the resulting influences of the inputs on the results. A study is also presented as an example of how using influence diagrams can help in technology planning and investment. The Space Propulsion Synergy Team (SPST) used this technique to examine the impact of R&D spending on the Life Cycle Cost (LCC) of a space transportation system. The question addressed was the effect on the recurring and the non-recurring portions of LCC of the proportion of R&D resources spent to impact technology objectives versus the proportion spent to impact operational dependability objectives. The goals, attributes, and the inputs were established. All of the linkages (influences) were determined. The weighting of each of the attributes and each of the linkages was determined. Finally the inputs were varied and the impacts on the LCC determined and are presented. The paper discusses how each of these was accomplished both for credibility and as an example for future studies using influence diagrams for technology planning and investment planning.

  12. Environment-friendly drilling operation technology

    Science.gov (United States)

    Luo, Huaidong; Jing, Ning; Zhang, Yanna; Huang, Hongjun; Wei, Jun

    2017-01-01

    Under the circumstance that international safety and environmental standards being more and more stringent, drilling engineering is facing unprecedented challenges, the extensive traditional process flow is no longer accepted, the new safe and environment-friendly process is more suitable to the healthy development of the industry. In 2015, CNPCIC adopted environment-friendly drilling technology for the first time in the Chad region, ensured the safety of well control, at the same time increased the environmental protection measure, reduced the risk of environmental pollution what obtain the ratification from local government. This technology carries out recovery and disposal of crude oil, cuttings and mud without falling on the ground. The final products are used in road and well site construction, which realizes the reutilization of drilling waste, reduces the operating cost, and provides a strong technical support for cost-cutting and performance-increase of drilling engineering under low oil price.

  13. INTELLIGENCE CYCLE PLANNING IN MILITARY COALITION OPERATIONS

    Directory of Open Access Journals (Sweden)

    Catalin ANTON

    2015-04-01

    Full Text Available Abstract A long list of allied or coalition type military actions against entities declared as aggressors, failed or terrorist states/organizations has been recorded for the past 25 years. To reach an end state for any action planned by the military or established at any decagon making level, usually the political one, all information must be shared throughout all coalition/ allied components. That is mainly done by specialized elements that play the role of primary structures in charge of analyzing all information necessary for the military commander’s decision-making process. In this context, the article aims to outline the importance of the decision-making process for military commandants, as part of large /important coalition / allied structures and the level of training required of the latter to use the intelligence cycle to fulfill their main mission in their area of responsibility.

  14. Plan for advanced microelectronics processing technology application

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  15. Campaign Planning for Peace Enforcement Operations

    Science.gov (United States)

    1994-05-17

    Security Council shall duly take account of failure to comply with such provisional measures . Article 41 The Security Council may decide what measures not...Disputes," gives the Security Council broad measures in which to encourage a peaceful settlement. 10 This chapter is the basis for UN PK operations...has been used independently (Libya, in 1986), and as a means to avoid the commitment of ground troops (Bosnia). This has its advntages , but one must

  16. Cyber Defense Planning: Operating on Unconventional Terrain

    Science.gov (United States)

    2012-09-01

    envisioned. They’ll also discover (Continued on page 8) 7Army Communicator Figure 1 U. S. Cyber Command as the Tier 1 CND -SP Report Documentation Page...the Tier 1 CND - SP. As of late 2009, no COCOM other than USSTRATCOM had created their own CND -SP, instead hiring DISA as the CND - SP for their...headquarters’ cyber positions. This and many others decisions have lead to a situation where, unless CND -SP actions crossed into operational chan- nels

  17. The Philae Lander: Science planning and operations

    Science.gov (United States)

    Moussi, Aurélie; Fronton, Jean-François; Gaudon, Philippe; Delmas, Cédric; Lafaille, Vivian; Jurado, Eric; Durand, Joelle; Hallouard, Dominique; Mangeret, Maryse; Charpentier, Antoine; Ulamec, Stephan; Fantinati, Cinzia; Geurts, Koen; Salatti, Mario; Bibring, Jean-Pierre; Boehnhardt, Hermann

    2016-08-01

    Rosetta is an ambitious mission launched in March 2004 to study comet 67P/Churyumov-Gerasimenko. It is composed of a space probe (Rosetta) and the Philae Lander. The mission is a series of premieres: among others, first probe to escort a comet, first time a landing site is selected with short turnaround time, first time a lander has landed on a comet nucleus. In November 2014, once stabilized on the comet, Philae has performed its "First Science Sequence". Philae's aim was to perform detailed and innovative in-situ experiments on the comet's surface to characterize the nucleus by performing mechanical, chemical and physical investigations on the comet surface. The main contribution to the Rosetta lander by the French space agency (CNES) is the Science Operation and Navigation Center (SONC) located in Toulouse. Among its tasks is the scheduling of the scientific activities of the 10 lander experiments and then to provide it to the Lander Control Center (LCC) located in DLR Cologne. The teams in charge of the Philae activity scheduling had to cope with considerable constraints in term of energy, data management, asynchronous processes and co-activities or exclusions between instruments. Moreover the comet itself, its environment and the landing conditions remained unknown until separation time. The landing site was selected once the operational sequence was already designed. This paper will explain the specific context of the Rosetta lander mission and all the constraints that the lander activity scheduling had to face to fulfill the scientific objectives specified for Philae. A specific tool was developed by CNES and used to design the complete sequence of activities on the comet with respect to all constraints. The baseline scenario for the lander operation will also be detailed as well as the sequence performed on the comet to highlight the difficulties and challenges that the operational team faced.

  18. Operational readiness: an integral part of the facility planning process.

    Science.gov (United States)

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move.

  19. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  20. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  1. Campaign Planning/Operational Art, Primer AY 07: Joint Advanced Warfighting School (JAWS) Joint Operation Planning Process

    Science.gov (United States)

    2007-01-01

    Counterintelligence; Civilian Internees CIA Central Intelligence Agency CIAP Command Intelligence Architecture Plan CID Criminal Investigation...MILGP Military Group (assigned to American Embassy in host nation) MIO Maritime Intercept Operations MIW Mine Warfare MLRS

  2. Applied technology center business plan and market survey

    Science.gov (United States)

    Hodgin, Robert F.; Marchesini, Roberto

    1990-01-01

    Business plan and market survey for the Applied Technology Center (ATC), computer technology transfer and development non-profit corporation, is presented. The mission of the ATC is to stimulate innovation in state-of-the-art and leading edge computer based technology. The ATC encourages the practical utilization of late-breaking computer technologies by firms of all variety.

  3. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  4. Nevada Experiments and Operations Program (N Program) Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  5. Sensing Hazards with Operational Unmanned Technology

    Science.gov (United States)

    Hood, R. E.

    2016-12-01

    The Unmanned Aircraft Systems (UAS) Program of the National Oceanic and Atmospheric Administration (NOAA) is working with the National Weather Service, the National Ocean Service, other Federal agencies, private industry, and academia to evaluate the feasibility of UAS observations to provide time critical information needed for situational awareness, prediction, warning, and damage assessment of hazards. This activity is managed within a portfolio of projects entitled "Sensing Hazards with Operational Unmanned Technology (SHOUT)." The diversity of this portfolio includes evaluations of high altitude UAS observations for high impact oceanic storms prediction to low altitude UAS observations of rivers, severe storms, and coastal areas for pre-hazard situational awareness and post-hazard damage assessments. Each SHOUT evaluation project begins with a proof-of-concept field demonstration of a UAS observing strategy for a given hazard and then matures to joint studies of both scientific data impact along with cost and operational feasibility of the observing strategy for routine applications. The technology readiness and preliminary evaulation results will be presented for several UAS observing strategies designed for improved observations of oceanic storms, floods, severe storms, and coastal ecosystem hazards.

  6. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  7. 36 CFR 9.37 - Plan of operations approval.

    Science.gov (United States)

    2010-07-01

    ..., natural catastrophe, acts of God, etc., for inspection shall not be included when computing either this... determination regarding the impact of this operation and cumulative impacts of all proposed and existing... Preservations Act of 1966 as implemented by 36 CFR part 800. (f) Approval of each plan of operations...

  8. 36 CFR 9.9 - Plan of operations.

    Science.gov (United States)

    2010-07-01

    ... minimum surface disturbance, (iv) Methods for disposal of all rubbish and other solid and liquid wastes... MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any... proposed mining; location and description of surface facilities, including dumps; (3) A description of the...

  9. Factors Influencing Technology Planning in Developing Countries: A Literature Review

    Science.gov (United States)

    Keengwe, Jared; Malapile, Sandy

    2014-01-01

    This article is a literature review concerning the factors that play an important role in the development of educational technology plans in the educational system of developing countries (DCs). Largely, the technology plans are influenced by factors that emanates from within the country (internal) and those outside of their borders (external).…

  10. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    Science.gov (United States)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  11. Software Technology for Adaptable, Reliable Systems (STARS) Technical Program Plan,

    Science.gov (United States)

    1986-08-06

    TPP (8/06186) * SOFTWARE TECHNOLOGY IE c0 FOR r ADAPTABLE, RELIABLE SYSTEMS (STARS) TECHNICAL PROGRAM PLAN 6 AUGUST 1986 DTIC ELECTEri NOV 141986WI...NONE NONE 11. TITLE (Include Security Classification) %. Software Technology for Adaptable, Reliable Systems (STARS) Technical Program Plan 12. PERSONAL...document is the top-level technical program plan for the STARS program. It describes the objectives of the program, the technical approach to achieve

  12. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  13. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  14. Health planning for remote petrochemical field operations

    Energy Technology Data Exchange (ETDEWEB)

    Krieger, G.R.; Balge, M.Z.

    1995-12-31

    Occupational/Public Health Services are becoming increasingly required in projects that involve the extended presence of expatriates in remote underdeveloped areas of the world. These ``expats`` are defined as individuals living and working in the environment who are not indigenous to the area. Under this definition, workers who are resistant to a ``local`` strain of malaria and then relocate to another geographic within the same country can also be considered as ``biologic expatriates`` since their resistance profile for certain tropical diseases is not reflective of their new environment. Unlike a major infrastructure project in the industrialized world, project planners in remote areas of the developing world should be expected to make significant long term medical and environmental commitments. US companies have extensive experience in the business of large-scale development projects, e.g. oil and gas pipelines and well field development; however, these projects represent major long-term in-country commitments with potentially large labor forces and substantial and sustained impacts on local health and safety resources. The initial structuring of health and safety programs will, therefore, have long-term ramifications on the project both during construction and ``routine`` operations since the multi-national companies are increasingly expected to develop and maintain self-sustaining health, safety and environmental programs.

  15. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  16. Sandia wind program FY94 annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, H.M.

    1993-10-01

    This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

  17. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  18. SMART-1 Technology and Science Experiments and their Operations

    Science.gov (United States)

    Marini, A.; Lumb, R.; Dias-Almeida, M.; Foing, B. H.

    2002-01-01

    , including: - the 17-month Earth escape phase when the spacecraft will spiral out our planet to perform a weak - a nominal 6-month operational phase in elliptical Moon orbit with peri-centre around the south The planning and co-ordination of the Technology and science experiments operations is carried out at ESA/ESTEC, where an agile service has been set up to connect and co-ordinate remotely the technology and science experimenters and to provide the experiment master plan to the Mission Operations Centre located at ESOC. The SMART-1 STOC (Science and Technology Operations Co- ordination) facility works in close synergy with the science operations teams of other ESA Planetary missions (Rosetta, Mars Express and Bepi-Colombo), making use of Internet communication and flexible scheduling and simulations tools. The SMART-1 STOC supports also the mission data archiving and is designed to provide the engineering and scientist communities with mission data access based on the PDS (Planetary Data System) Standard.

  19. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  20. The United States national volcanic ash operations plan for aviation

    Science.gov (United States)

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  1. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...... and illustrated by an example, namely for planning of inspections and maintenance of wind turbine blades. A life-cycle approach is used where the total expected cost in the remaining lifetime is minimized. This maintenance plan is continuously updated during the lifetime using information from previous...... inspections and from condition monitoring with time intervals between inspections and maintenance / repair options as the decision parameters....

  2. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  3. The impact of e-business technologies on supply chain operations: a macroeconomic perspective

    OpenAIRE

    Amit Basu; Thomas F. Siems

    2004-01-01

    New information technologies and e-business solutions have transformed supply chain operations from mass production to mass customization. This paper assesses the impact of these innovations on economic productivity, focusing on the macroeconomic benefits as supply chain operations have evolved from simple production and planning systems to today's real-time performance-management information systems using advanced e-business technologies. While many factors can influence macroeconomic variab...

  4. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  5. Operational research models in warehouse design and planning

    OpenAIRE

    Geraldes, Carla A. S.; Carvalho, Sameiro; Pereira, Guilherme

    2010-01-01

    The design and operation of a warehouse involve many challenging decision problems. In this paper, a literature review on warehousing models is presented. Authors start with a hierarchy of decision problems encountered in setting up warehouse design and planning processes. Next, some operational research decision models and solution algorithms supporting decision making at each discussed level are presented. The aim is to link academic researchers and warehouse practitioners, explaining what ...

  6. Capacity planning in operations producing heavy plate cut shapes

    Directory of Open Access Journals (Sweden)

    R. Lenort

    2009-07-01

    Full Text Available The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP.

  7. A model technology transfer program for independent operators: Kansas Technology Transfer Model (KTTM)

    Energy Technology Data Exchange (ETDEWEB)

    Schoeling, L.G.

    1993-09-01

    This report describes the development and testing of the Kansas Technology Transfer Model (KTTM) which is to be utilized as a regional model for the development of other technology transfer programs for independent operators throughout oil-producing regions in the US. It describes the linkage of the regional model with a proposed national technology transfer plan, an evaluation technique for improving and assessing the model, and the methodology which makes it adaptable on a regional basis. The report also describes management concepts helpful in managing a technology transfer program. The original Tertiary Oil Recovery Project (TORP) activities, upon which the KTTM is based, were developed and tested for Kansas and have proved to be effective in assisting independent operators in utilizing technology. Through joint activities of TORP and the Kansas Geological Survey (KGS), the KTTM was developed and documented for application in other oil-producing regions. During the course of developing this model, twelve documents describing the implementation of the KTTM were developed as deliverables to DOE. These include: (1) a problem identification (PI) manual describing the format and results of six PI workshops conducted in different areas of Kansas, (2) three technology workshop participant manuals on advanced waterflooding, reservoir description, and personal computer applications, (3) three technology workshop instructor manuals which provides instructor material for all three workshops, (4) three technologies were documented as demonstration projects which included reservoir management, permeability modification, and utilization of a liquid-level acoustic measuring device, (5) a bibliography of all literature utilized in the documents, and (6) a document which describes the KTTM.

  8. Systems autonomy technology: Executive summary and program plan

    Science.gov (United States)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  9. The CONSERT operations planning process for the Rosetta mission

    Science.gov (United States)

    Rogez, Yves; Puget, Pascal; Zine, Sonia; Hérique, Alain; Kofman, Wlodek; Altobelli, Nicolas; Ashman, Mike; Barthélémy, Maud; Biele, Jens; Blazquez, Alejandro; Casas, Carlos M.; Sitjà, Marc Costa; Delmas, Cédric; Fantinati, Cinzia; Fronton, Jean-François; Geiger, Bernhard; Geurts, Koen; Grieger, Björn; Hahnel, Ronny; Hoofs, Raymond; Hubault, Armelle; Jurado, Eric; Küppers, Michael; Maibaum, Michael; Moussi-Souffys, Aurélie; Muñoz, Pablo; O'Rourke, Laurence; Pätz, Brigitte; Plettemeier, Dirk; Ulamec, Stephan; Vallat, Claire

    2016-08-01

    The COmet Nucleus Sounding Experiment by Radio wave Transmission (CONSERT / Rosetta) has been designed to sound the interior of the comet 67P/Churyumov-Gerasimenko. This instrument consists of two parts: one onboard Rosetta and the other one onboard Philae. A good CONSERT science measurement sequence requires joint operations of both spacecrafts in a relevant geometry. The geometric constraints to be fulfilled involve the position and the orientation of both Rosetta and Philae. At the moment of planning the post-landing and long-term science operations for Rosetta instruments, the actual comet shape and the landing location remained largely unknown. In addition, the necessity of combining operations of Rosetta spacecraft and Philae spacecraft makes the planning process for CONSERT particularly complex. In this paper, we present the specific methods and tools we developed, in close collaboration with the mission and the science operation teams for both Rosetta and Philae, to identify, rank and plan the operations for CONSERT science measurements. The presented methods could be applied to other missions involving joint operations between two platforms, on a complex shaped object.

  10. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  11. An Analysis of Current Operational Contract Support Planning Doctrine

    Science.gov (United States)

    2015-09-01

    analysis of doctrine and planning assets . The activities include interviews with various contracting and logistics professionals. F. RESEARCH...doctrine typically neglects the tangible and intangible capabilities that using OCS in missions brings to the operational and combatant commander. While... measuring the maturity of a process in practice within an organization through the issuing of surveys and measuring the responses. The model used

  12. Operations of and Future Plans for the Pierre Auger Observatory

    CERN Document Server

    Abraham, J; Aglietta, M; Aguirre, C; Ahn, E J; Allard, D; Allekotte, I; Allen, J; Alvarez-Muñiz, J; Ambrosio, M; Anchordoqui, L; Andringa, S; Anzalone, A; Aramo, C; Arganda, E; Argirò, S; Arisaka, K; Arneodo, F; Arqueros, F; Asch, T; Asorey, H; Assis, P; Aublin, J; Ave, M; Avila, G; Bäcker, T; Badagnani, D; Barber, K B; Barbosa-Ademarlaudo, F; Barroso, S L C; Baughman, B; Bauleo, P; Beatty, J J; Beau, T; Becker, B R; Becker, K H; Bellétoile, A; Bellido, J A; BenZvi, S; Bérat, C; Bernardini, P; Bertou, X; Biermann, P L; Billoir, P; Blanch-Bigas, O; Blanco, F; Bleve, C; Blümer, H; Boháčová, M; Boncioli, D; Bonifazi, C; Bonino, R; Borodai, N; Brack, J; Brogueira, P; Brown, W C; Bruijn, R; Buchholz, P; Bueno, A; Burton, R E; Busca, N G; Caballero-Mora, K S; Caramete, L; Caruso, R; Carvalho, W; Castellina, A; Catalano, O; Cazon, L; Cester, R; Chauvin, J; Chiavassa, A; Chinellato, J A; Chou, A; Chudoba, J; Chye, J; Clay, R W; Colombo, E; Conceição, R; Connolly, B; Contreras, F; Coppens, J; Cordier, A; Cotti, U; Coutu, S; Covault, C E; Creusot, A; Criss, A; Cronin, J; Curutiu, A; agoret-Campagne, S; Dallier, R; Daumiller, K; Dawson, B R; de Almeida, R M; De Domenico, M; De Donato, C; De Jong, S J; De La Vega, G; Junior, W J M de Mello; Neto, J R T de Mello; De Mitri, I; De Souza, V; de Vries, K D; Decerprit, G; Del Peral, L; Deligny, O; Della Selva, A; Fratte, C Delle; Dembinski, H; DiGiulio, C; Diaz, J C; Diep, P N; Dobrigkeit, C; D'Olivo, J C; Dong, P N; Dorofeev, A; Anjos, J C dos; Dova, M T; D'Urso, D; Dutan, I; Duvernois, M A; Engel, R; Erdmann, M; Escobar, C O; Etchegoyen, A; Luis, P Facal San; Falcke, H; Farrar, G; Fauth, A C; Fazzini, N; Ferrer, F; Ferrero, A; Fick, B; Filevich, A; Filipčič, A; Fleck, I; Fliescher, S; Fracchiolla, C E; Fraenkel, E D; Fulgione, W; Gamarra, R F; Gambetta, S; García, B; GarcíaGámez, D; Garcia-Pinto, D; Garrido, X; Gelmini, G; Gemmeke, H; Ghia, P L; Giaccari, U; Giller, M; Glass, H; Goggin, L M; Gold, M S; Golup, G; Albarracin, F Gomez; Berisso, M Gómez; Gonçalves, P; Amaral, M Gonçalves do; González, D; Gonzalez, J G; Góra, D; Gorgi, A; Gouffon, P; Gozzini, S R; Grashorn, E; Grebe, S; Grigat, M; Grillo, A F; Guardincerri, Y; Guarino, F; Guedes, G P; Gutiérrez, J; Hague, J D; Halenka, V; Hansen, P; Harari, D; Harmsma, S; Harton, J L; Haungs, A; Healy, M D; Hebbeker, T; Hebrero, G; Heck, D; Holmes, V C; Homola, P; Hörandel, J R; Horneffer, A; Hrabovský, M; Huege, T; Hussain, M; Iarlori, M; Insolia, A; Ionita, F; Italiano, A; Jiraskova, S; Kaducak, M; Kampert, K H; Karova, T; Kasper, P; Kégl, B; Keilhauer, B; Kemp, E; Kieckhafer, R M; Klages, H O; Kleifges, M; Kleinfeller, J; Knapik, R; Knapp, J; Koang, D -H; Krieger, A; Krömer, O; Kruppke-Hansen, D; Kühn, F; Kuempel, D; Kulbartz, K; Kunka, N; Kusenko, A; LaRosa, G; Lachaud, C; Lago, B L; Lautridou, P; Leão, M S A B; Lebrun, D; Lebrun, P; Lee, J; de Oliveira, M A Leigui; Lemiere, A; Letessier-Selvon, A A; Leuthold, M; Lhenry-Yvon, I; López, R; Agüera, A Lopez; Louedec, K; Bahilo, J Lozano; Lucero, A; Lyberis, H; Maccarone, M C; Macolino, C; Maldera, S; Mandat, D; Mantsch, P; Mariazzi, A G; Maris, I C; Falcon, H R Marquez; Martello, D; Bravo, O Martínez; Mathes, H J; Matthews, J; Matthews, J A J; Matthiae, G; Maurizio, D; Mazur, P O; McEwen, M; McNeil, R R; Medina-Tanco, G; Melissas, M; Melo, D; Menichetti, E; Menshikov, A; Meyhandan, R; Micheletti, M I; Miele, G; Miller, W; Miramonti, L; Mollerach, S; Monasor, M; Ragaigne, D Monnier; Montanet, F; Morales, B; Morello, C; Moreno, J C; Morris, C; Mostafá, M; Moura, C A; Müller, S; Muller, M A; Mussa, R; Navarra, G; Navarro, J L; Navas, S; Necesal, P; Nellen, L; Newman-Holmes, C; Newton, D; Nhung, P T; Nierstenhoefer, N; Nitz, D; Nosek, D; Nožka, L; Nyklicek, M; Oehlschläger, J; Olinto, A; Oliva, P; Olmos-Gilbaja, V M; Ortiz, M; Pacheco, N; Selmi-Dei, D Pakk; Palatka, M; Pallotta, J; Parente, G; Parizot, E; Parlati, S; Pastor, S; Patel, M; Paul, T; Pavlidou, V; Payet, K; Pech, M; Pȩkala, J; Pepe, I M; Perrone, L; Pesce, R; Petermann, E; Petrera, S; Petrinca, P; Petrolini, A; Petrov, Y; Petrovic, J; Pfendner, C; Piegaia, R; Pierog, T; Pimenta, M; Pinto, T; Pirronello, V; Pisanti, O; Platino, M; Pochon, J; Ponce, V H; Pontz, M; Privitera, P; Prouza, M; Quel, E J; Rautenberg, J; Ravel, O; Ravignani, D; Redondo, A; Revenu, B; Rezende, F A S; Rídky, J; Riggi, S; Risse, M; Rivière, C; Rizi, V; Robledo, C; Rodríguez, G; Martino, J Rodriguez; Rojo, J Rodriguez; Rodriguez-Cabo, I; Rodríguez-Frías, M D; Ros, G; Rosado, J; Rossler, T; Roth, M; Rouillé-d'Orfeuil, B; Roulet, E; Rovero, A C; Salamida, F; Salazar, H; Salina, G; Sánchez, F; Santander, M; Santo, C E; Santos, E M; Sarazin, F; Sarkar, S; Sato, R; Scharf, N; Scherini, V; Schieler, H; Schiffer, P; Schmidt, A; Schmidt, F; Schmidt, T; Scholten, O; Schoorlemmer, H; Schovancova, J; Schovánek, P; Schroeder, F; Schulte, S; Schüssler, F; Schuster, D; Sciutto, S J; Scuderi, M; Segreto, A; Semikoz, D; Settimo, M; Shellard, R C; Sidelnik, I; Siffert, B B; Sigl, G; Śmiałkowski, A; Šmída, R; Smith, B E; Snow, G R; Sommers, P; Sorokin, J; Spinka, H; Squartini, R; Strazzeri, E; Stutz, A; Suárez, F; Suomijärvi, T; Supanitsky, A D; Sutherland, M S; Swain, J; Szadkowski, Z; Tamashiro, A; Tamburro, A; Tarutina, T; Taşcuau, O; Tcaciuc, R; Tcherniakhovski, D; Tegolo, D; Thao, N T; Thomas, D; Ticona, R; Tiffenberg, J; Timmermans, C; Tkaczyk, W; Peixoto, C J Todero; Tomé, B; Tonachini, A; Torres, I; Travnicek, P; Tridapalli, D B; Tristram, G; Trovato, E; Tueros, M; Ulrich, R; Unger, M; Urban, M; Galicia, J F Valdés; Valiño, I; Valore, L; VandenBerg, A M; Vázquez, J R; Vázquez, R A; Veberič, D; Velarde, A; Venters, T; Verzi, V; Videla, M; Villaseñor, L; Vorobiov, S; Voyvodic, L; Wahlberg, H; Wahrlich, P; Wainberg, O; Warner, D; Watson, A A; Westerhoff, S; Whelan, B J; Wieczorek, G; Wiencke, L; Wilczyńska, B; Wilczyński, H; Wileman, C; Winnick, M G; Wu, H; Wundheiler, B; Yamamoto, T; Younk, P; Yuan, G; Yushkov, A; Zas, E; Zavrtanik, D; Zavrtanik, M; Zaw, I; Zepeda, A; Ziolkowski, M

    2009-01-01

    Technical reports on operations and features of the Pierre Auger Observatory, including ongoing and planned enhancements and the status of the future northern hemisphere portion of the Observatory. Contributions to the 31st International Cosmic Ray Conference, Lodz, Poland, July 2009.

  13. Operations of and Future Plans for the Pierre Auger Observatory

    NARCIS (Netherlands)

    The Pierre Auger Collaboration: J. Abraham, [No Value; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E. J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muñiz, J.; Ambrosio, M.; Anchordoqui, L.; Andringa, S.; Anzalone, A.; Aramo, C.; Arganda, E.; Argirò, S.; Arisaka, K.; Arneodo, F.; Arqueros, F.; Asch, T.; Asorey, H.; Assis, P.; Aublin, J.; Ave, M.; Avila, G.; Bäcker, T.; Badagnani, D.; Barber, K. B.; Barbosa, A. F.; Barroso, S. L. C.; Baughman, B.; Bauleo, P.; Beatty, J. J.; Beau, T.; Becker, B. R.; Becker, K. H.; Bellétoile, A.; Bellido, J. A.; BenZvi, S.; Berat, C.; Bernardini, P.; Bertou, X.; Biermann, P. L.; Billoir, P.; Blanch-Bigas, O.; Blanco, F.; Bleve, C.; Blümer, H.; Boháčová, M.; Boncioli, D.; Bonifazi, C.; Bonino, R.; Borodai, N.; Brack, J.; Brogueira, P.; Brown, W. C.; Bruijn, R.; Buchholz, P.; Bueno, A.; Burton, R. E.; Busca, N. G.; Caballero-Mora, K. S.; Caramete, L.; Caruso, R.; Carvalho, W.; Castellina, A.; Catalano, O.; Cazon, L.; Cester, R.; Chauvin, J.; Chiavassa, A.; Chinellato, J. A.; Chou, A.; Chudoba, J.; Chye, J.; Clay, R. W.; Colombo, E.; Conceição, R.; Connolly, B.; Contreras, F.; Coppens, J.; Cordier, A.; Cotti, U.; Coutu, S.; Covault, C. E.; Creusot, A.; Criss, A.; Cronin, J.; Curutiu, A.; agoret-Campagne, S.; Dallier, R.; Daumiller, K.; Dawson, B. R.; de Almeida, R. M.; De Domenico, M.; De Donato, C.; de Jong, S. J.; De La Vega, G.; de Mello Junior, W. J. M.; de Mello Neto, J. R. T.; De Mitri, I.; de Souza, V.; de Vries, K.D.; Decerprit, G.; del Peral, L.; Deligny, O.; Della Selva, A.; Delle Fratte, C.; Dembinski, H.; DiGiulio, C.; Diaz, J. C.; Diep, P. N.; Dobrigkeit, C.; D'Olivo, J. C.; Dong, P. N.; Dorofeev, A.; dos Anjos, J. C.; Dova, M. T.; D'Urso, D.; Dutan, I.; DuVernois, M. A.; Engel, R.; Erdmann, M.; Escobar, C. O.; Etchegoyen, A.; Facal San Luis, P.; Falcke, H.; Farrar, G.; Fauth, A. C.; Fazzini, N.; Ferrer, F.; Ferrero, A.; Fick, B.; Filevich, A.; Filipčič, A.; Fleck, I.; Fliescher, S.; Fracchiolla, C. E.; Fraenkel, E. D.; Fulgione, W.; Gamarra, R. F.; Gambetta, S.; García, B.; GarcíaGámez, D.; Garcia-Pinto, D.; Garrido, X.; Gelmini, G.; Gemmeke, H.; Ghia, P. L.; Giaccari, U.; Giller, M.; Glass, H.; Goggin, L. M.; Gold, M. S.; Golup, G.; Gomez Albarracin, F.; Gómez Berisso, M.; Gonçalves, P.; Gonçalves do Amaral, M.; Gonzalez, D.; Gonzalez, J. G.; Góra, D.; Gorgi, A.; Gouffon, P.; Gozzini, S. R.; Grashorn, E.; Grebe, S.; Grigat, M.; Grillo, A. F.; Guardincerri, Y.; Guarino, F.; Guedes, G. P.; Gutiérrez, J.; Hague, J. D.; Halenka, V.; Hansen, P.; Harari, D.; Harmsma, S.; Harton, J. L.; Haungs, A.; Healy, M. D.; Hebbeker, T.; Hebrero, G.; Heck, D.; Holmes, V. C.; Homola, P.; Hörandel, J. R.; Horneffer, A.; Hrabovský, M.; Huege, T.; Hussain, M.; Iarlori, M.; Insolia, A.; Ionita, F.; Italiano, A.; Jiraskova, S.; Kaducak, M.; Kampert, K. H.; Karova, T.; Kasper, P.; Kégl, B.; Keilhauer, B.; Kemp, E.; Kieckhafer, R. M.; Klages, H. O.; Kleifges, M.; Kleinfeller, J.; Knapik, R.; Knapp, J.; Koang, D. -H.; Krieger, A.; Krömer, O.; Kruppke-Hansen, D.; Kuehn, F.; Kuempel, D.; Kulbartz, K.; Kunka, N.; Kusenko, A.; LaRosa, G.; Lachaud, C.; Lago, B. L.; Lautridou, P.; Leão, M. S. A. B.; Lebrun, D.; Lebrun, P.; Lee, J.; Leigui de Oliveira, M. A.; Lemiere, A.; Letessier-Selvon, A.; Leuthold, M.; Lhenry-Yvon, I.; López, R.; Lopez Agüera, A.; Louedec, K.; Lozano Bahilo, J.; Lucero, A.; Lyberis, H.; Maccarone, M. C.; Macolino, C.; Maldera, S.; Mandat, D.; Mantsch, P.; Mariazzi, A. G.; Maris, I. C.; Marquez Falcon, H. R.; Martello, D.; Martínez Bravo, O.; Mathes, H. J.; Matthews, J.; Matthews, J. A. J.; Matthiae, G.; Maurizio, D.; Mazur, P. O.; McEwen, M.; McNeil, R. R.; Medina-Tanco, G.; Melissas, M.; Melo, D.; Menichetti, E.; Menshikov, A.; Meyhandan, R.; Micheletti, M. I.; Miele, G.; Miller, W.; Miramonti, L.; Mollerach, S.; Monasor, M.; Monnier Ragaigne, D.; Montanet, F.; Morales, B.; Morello, C.; Moreno, J. C.; Morris, C.; Mostafá, M.; Moura, C. A.; Mueller, S.; Muller, M. A.; Mussa, R.; Navarra, G.; Navarro, J. L.; Navas, S.; Necesal, P.; Nellen, L.; Newman-Holmes, C.; Newton, D.; Nhung, P. T.; Nierstenhoefer, N.; Nitz, D.; Nosek, D.; Nožka, L.; Nyklicek, M.; Oehlschläger, J.; Olinto, A.; Oliva, P.; Olmos-Gilbaja, V. M.; Ortiz, M.; Pacheco, N.; Pakk Selmi-Dei, D.; Palatka, M.; Pallotta, J.; Parente, G.; Parizot, E.; Parlati, S.; Pastor, S.; Patel, M.; Paul, T.; Pavlidou, V.; Payet, K.; Pech, M.; Pȩkala, J.; Pepe, I. M.; Perrone, L.; Pesce, R.; Petermann, E.; Petrera, S.; Petrinca, P.; Petrolini, A.; Petrov, Y.; Petrovic, J.; Pfendner, C.; Piegaia, R.; Pierog, T.; Pimenta, M.; Pinto, T.; Pirronello, V.; Pisanti, O.; Platino, M.; Pochon, J.; Ponce, V. H.; Pontz, M.; Privitera, P.; Prouza, M.; Quel, E. J.; Rautenberg, J.; Ravel, O.; Ravignani, D.; Redondo, A.; Revenu, B.; Rezende, F. A. S.; Ridky, J.; Riggi, S.; Risse, M.; Rivière, C.; Rizi, V.; Robledo, C.; Rodriguez, G.; Rodriguez Martino, J.; Rodriguez Rojo, J.; Rodriguez-Cabo, I.; Rodríguez-Frías, M. D.; Ros, G.; Rosado, J.; Rossler, T.; Roth, M.; Rouillé-d'Orfeuil, B.; Roulet, E.; Rovero, A. C.; Salamida, F.; Salazar, H.; Salina, G.; Sánchez, F.; Santander, M.; Santo, C. E.; Santos, E. M.; Sarazin, F.; Sarkar, S.; Sato, R.; Scharf, N.; Scherini, V.; Schieler, H.; Schiffer, P.; Schmidt, A.; Schmidt, F.; Schmidt, T.; Scholten, O.; Schoorlemmer, H.; Schovancova, J.; Schovánek, P.; Schroeder, F.; Schulte, S.; Schüssler, F.; Schuster, D.; Sciutto, S. J.; Scuderi, M.; Segreto, A.; Semikoz, D.; Settimo, M.; Shellard, R. C.; Sidelnik, I.; Siffert, B. B.; Sigl, G.; Śmiałkowski, A.; Šmída, R.; Smith, B. E.; Snow, G. R.; Sommers, P.; Sorokin, J.; Spinka, H.; Squartini, R.; Strazzeri, E.; Stutz, A.; Suarez, F.; Suomijärvi, T.; Supanitsky, A. D.; Sutherland, M. S.; Swain, J.; Szadkowski, Z.; Tamashiro, A.; Tamburro, A.; Tarutina, T.; Taşcuau, O.; Tcaciuc, R.; Tcherniakhovski, D.; Tegolo, D.; Thao, N. T.; Thomas, D.; Ticona, R.; Tiffenberg, J.; Timmermans, C.; Tkaczyk, W.; Todero Peixoto, C. J.; Tomé, B.; Tonachini, A.; Torres, I.; Travnicek, P.; Tridapalli, D. B.; Tristram, G.; Trovato, E.; Tueros, M.; Ulrich, R.; Unger, M.; Urban, M.; Valdés Galicia, J. F.; Valiño, I.; Valore, L.; VandenBerg, A. M.; Vázquez, J. R.; Vázquez, R. A.; Veberič, D.; Velarde, A.; Venters, T.; Verzi, V.; Videla, M.; Villaseñor, L.; Vorobiov, S.; Voyvodic, L.; Wahlberg, H.; Wahrlich, P.; Wainberg, O.; Warner, D.; Watson, A. A.; Westerhoff, S.; Whelan, B. J.; Wieczorek, G.; Wiencke, L.; Wilczyńska, B.; Wilczyński, H.; Wileman, C.; Winnick, M. G.; Wu, H.; Wundheiler, B.; Yamamoto, T.; Younk, P.; Yuan, G.; Yushkov, A.; Zas, E.; Zavrtanik, D.; Zavrtanik, M.; Zaw, I.; Zepeda, A.; Ziolkowski, M.

    2009-01-01

    Technical reports on operations and features of the Pierre Auger Observatory, including ongoing and planned enhancements and the status of the future northern hemisphere portion of the Observatory. Contributions to the 31st International Cosmic Ray Conference, Lodz, Poland, July 2009.

  14. Educational Trends Shaping School Planning, Design, Construction, Funding and Operation

    Science.gov (United States)

    Stevenson, Kenneth R.

    2010-01-01

    What does the future hold for educators and facilities professionals when it comes to planning, building, funding, and operating school facilities? No one can absolutely know beforehand. However, there are many, many indicators of where public education in the United States may well be destined. These indicators take the form of already occurring…

  15. Test plans of the high temperature test operation at HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30 MW with the reactor outlet coolant temperature at 950 degrees centigrade. (author)

  16. Technology disaster response and recovery planning a LITA guide

    CERN Document Server

    Mallery, Mary

    2015-01-01

    Featuring contributions from librarians who offer hard-won advice gained from personal experience, this compendium leads readers through a step-by-step process of creating a library technology disaster response and recovery plan.

  17. Mission activities planning for a Hermes mission by means of AI-technology

    Science.gov (United States)

    Pape, U.; Hajen, G.; Schielow, N.; Mitschdoerfer, P.; Allard, F.

    1993-01-01

    Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.

  18. Space Station assembly sequence planning - An engineering and operational challenge

    Science.gov (United States)

    Kaidy, James T.; Bastedo, William G.

    1988-01-01

    This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

  19. Phase Zero Contracting Operations (PZCO) -- Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2012-05-02

    Tier Model ( TTM ) ........................... 15  A.  Credentialed Contract Planners Integrated with Operations Planners...Planners The Three-tier Model ( TTM ) was published to address the challenges inherent in contracting in complex military operations (Yoder, 2004). The...Contingency Contracting, Expeditionary Contracting, Humanitarian Aid, Disaster Relief, Advanced Planning, Three-tier Model , YTTM, APEX, JOPES, JCASO

  20. Standard Systems Group (SSG) Technology Adoption Planning Workshop

    Science.gov (United States)

    2004-04-01

    Internet Routed Protocol Network (SIPRNET) architecture • Replace the current 5-year old enterprise network backup system • Improve of current IPTV ...Standard Systems Group (SSG) Technology Adoption Planning Workshop Suzanne Garcia Lorraine Nemeth-Adams Jan Vargas April 2004...Standard Systems Group(SSG) Technology Adoption Planning Workshop 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  1. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J.C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M.V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  2. Technology-Based Lesson Plans: Preparation and Description

    Science.gov (United States)

    Kubilinskiene, Svetlana; Dagiene, Valentina

    2010-01-01

    A lesson plan is an important methodological component of the learning process. The key purpose of the article is to analyse the current situation and suggest how the information technologies can assist in the development of lesson plans, their accumulation and retrieval, thus ensuring their effective application. The authors disclose the problems…

  3. Advanced Education and Technology Business Plan, 2008-11

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2008

    2008-01-01

    The Ministry of Advanced Education and Technology's 2008-11 business plan identifies how it plans to work over the next three years to enhance advanced learning opportunities and innovation for all Albertans. Alberta's advanced learning system is composed of public board-governed institutions, the apprenticeship and industry training system,…

  4. Oakland Operations Office, Oakland, California: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    DOE`s Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention.

  5. Technology roadmapping: The integration of strategic and technology planning for competitiveness

    Energy Technology Data Exchange (ETDEWEB)

    Bray, O.H.; Garcia, M.L.

    1997-04-01

    Technology roadmapping is a form of technology planning that can help organizations deal with an increasingly competitive environment. As a DOE laboratory with R&D as a major product, Sandia must do effective technology planning to identify and develop technologies required to meet its mission. Once technology enhancements or new technologies are identified, they may be developed internally or collaboratively with external partners. For either approach, technology roadmapping is an effective tool for technology planning and coordination, which fits within a broader set of planning activities. Potential benefits of roadmapping include identifying critical technologies and gaps, coordination of research activities, and improved marketing information. Roadmapping is particularly useful when investment decisions are not straightforward and for coordinating the development of multiple technologies, especially across multiple projects. This paper formalizes and documents the technology roadmapping process. It describes the process and shows how it fits within an overall strategic and technology planning process. The technology roadmapping process consists of three phases: preliminary activity, development of the roadmap, and followup activity. Preliminary activity includes: satisfy essential conditions, provide leadership/sponsorship, and define the scope and boundaries for the roadmap. Development of the technology roadmap includes: (1) Identify the {open_quotes}product{close_quotes} that will be the focus of the roadmap. (2) Identify the critical system requirements and their targets. (3) Specify the major technology areas. (4) Specify the technology drivers and their targets. (5) Identify technology alternatives and their time lines. (6) Recommend the technology alternatives that should be pursued. (7) Create the technology roadmap report. Follow-up activity includes: (1) Critique and validate the roadmap. (2) Develop an implementation plan. (3) Review and update.

  6. Preoperative planning and designing of a fluorocompatible endourology operating room.

    Science.gov (United States)

    Sabnis, Ravindra B; Mishra, Shashikant; Sharma, Rajan; Desai, Mahesh R

    2009-10-01

    A dedicated fluoroscopic-compatible operating room (OR) for endourologic procedures, such as percutaneous nephrolithotomy and ureteroscopy, is structurally and functionally different from the general OR. Publications with practical details are scarce, imposing a challenge in construction of such an OR. We outline a practical approach for the design and construction of a modern flourocompatible endourology OR. There were no publications related to a dedicated endourology OR in Medline. A search was then performed for English language articles on OR designing, fluoroscopy in the OR, data archiving, and data relay. We also surveyed the existing endourology OR in different hospitals and analyzed the available technology for audiovisual capture and relay in surgery. This article was then prepared, covering the relevant areas on designing a dedicated flourocompatible endourology OR. Close cooperation and interaction between an architect and expert construction manager for designing, development, and construction of an OR are necessary. Strategic equipment placement with booms is essential to increase the efficiency and safety within the surgical space. Distinct features of an endourology OR are thickness of the walls for radiation protection, wide OR gate, central floor water exit drain, flourocompatible rotatable OR table, C-arm unit, minimum three hanging thin-film transistor (TFT) screen monitors, and endoscopic equipment supported on a boom. The anesthetic boom should be retractable and movable from one end of the OR table to other. The OR should have an electronic workstation strategically located at one corner for data capture, archiving, and telementoring. Data relay of the OR procedure is facilitated by a control room located in the vicinity of the OR. Designing the layout of the OR is extremely important, necessitating thoughtful planning to provide hassle-free movement, comfort to the surgeon, and efficient data archiving and transmission during a surgical

  7. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  8. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  9. Minimal Technologies Application Project: Planning and installation

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  10. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  11. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  12. Hinode/EIS science planning and operations tools

    Science.gov (United States)

    Rainnie, Jonn A.

    2016-07-01

    We present the design, implementation and maintenance of the suite of software enabling scientists to design and schedule Hinode/EIS1 operations. The total of this software is the EIS Science Planning Tools (EISPT), and is predominately written in IDL (Interactive Data Language), coupled with SolarSoft (SSW), an IDL library developed for solar missions. Hinode is a multi-instrument and wavelength mission designed to observe the Sun. It is a joint Japan/UK/US consortium (with ESA and Norwegian involvement). Launched in September 2006, its principal scientific goals are to study the Sun's variability and the causes of solar activity. Hinode operations are coordinated at ISAS (Tokyo, Japan). A daily Science Operations meeting is attended by the instrument teams and the spacecraft team. Nominally, science plan uploads cover periods of two or three days. When the forthcoming operations have been agreed, the necessary spacecraft operations parameters are created. These include scheduling for spacecraft pointing and ground stations. The Extreme UV Imaging Spectrometer (EIS) instrument, led by the UK (the PI institute is MSSL), is designed to observe the emission spectral lines of the solar atmosphere. Observations are composed of reusable, hierarchical components, including lines lists (wavelengths of spectral lines), rasters (exposure times, line list, etc.) and studies (defines one or more rasters). Studies are the basic unit of "timeline" scheduling. They are a useful construct for generating more complex sequences of observations, reducing the planning burden. Instrument observations must first be validated. An initial requirement was that operations be shared equally by the 3 main EIS teams (Japan, UK and US). Hence, a major design focus of the software was "Remote Operations", whereby any scientist in any location can run the software, schedule a science plan and send it to the spacecraft commanding team. It would then be validated and combined with the science

  13. Advanced Education and Technology Business Plan, 2010-13

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2010

    2010-01-01

    This paper presents the business plan of the Ministry of Advanced Education and Technology for 2010 to 2013. Advanced Education and Technology supports the advanced learning system by providing funding for advanced learning providers, coordinating and approving programs of study at public institutions, licensing and approving programs at private…

  14. Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2016-02-01

    Full Text Available Building information modeling (BIM technologies use precise geometry and relevant data to enhance and improve the maintenance performance of facilities integrated with 3D object-oriented computer aided design (CAD. Although most owners agree on the potential benefits of integrating BIM technologies with facility management (FM, they must overcome many problems to plan and develop effective BIM execution plans for FM implementation. This study proposes and develops a BIM execution plan for BIM model management for FM during the pre-operation phase. Through the application of the proposed BIM execution plan, BIM can be effectively implemented during the operation and maintenance phases. In order to verify the proposed methodology and demonstrate its effectiveness in practice, the BIM execution plan is then applied in a selected case study of a building project in Taiwan. The combined results demonstrate that the proposed BIM execution plan is an effective approach for operation and maintenance management. The advantage of the proposed BIM execution plan lies not only in improving the efficiency of maintenance management work when integrated with BIM technologies, but also in maximizing the value and benefits of BIM to support maintenance management. Finally, limitations, difficulties, and suggestions are summarized for further development of the BIM execution plan for BIM model management during the pre-operation phase.

  15. Operations planning for agricultural harvesters using ant colony optimization

    Directory of Open Access Journals (Sweden)

    A. Bakhtiari

    2013-07-01

    Full Text Available An approach based on ant colony optimization for the generation for optimal field coverage plans for the harvesting operations using the optimal track sequence principle B-patterns was presented. The case where the harvester unloads to a stationary facility located out of the field area, or in the field boundary, was examined. In this operation type there are capacity constraints to the load that a primary unit, or a harvester in this specific case, can carry and consequently, it is not able to complete the task of harvesting a field area and therefore it has to leave the field area, to unload, and return to continue the task one or more times. Results from comparing the optimal plans with conventional plans generated by operators show reductions in the in-field nonworking distance in the range of 19.3-42.1% while the savings in the total non-working distance were in the range of 18-43.8%. These savings provide a high potential for the implementation of the ant colony optimization approach for the case of harvesting operations that are not supported by transport carts for the out-of-the-field removal of the crops, a practice case that is normally followed in developing countries, due to lack of resources.

  16. Pacific Operational Science and Technology Conference

    Science.gov (United States)

    2008-07-17

    to demonstrate the interoperability of production-ready Mode 5 IFF transponders and interrogators. France, Italy, NATO, UK Multinational C4 Network...Planning System (MC4NPS) (EUCOM) To enhance the usability of the C4 Interoperability Planning Guide developed during Combine Endeavor exercises...research field Saturn – Hot/Cold X-Rays Sandia Z Facility – Cold X-Rays National Ignition Facility ( NIF ) – Cold/Warm X- Rays (Future?) Modular

  17. Nuclear Technology Series. Radiation Protection Technician. A Suggested Program Planning Guide. Revised June 80.

    Science.gov (United States)

    Center for Occupational Research and Development, Inc., Waco, TX.

    This program planning guide for a two-year postsecondary radiation protection technician program is designed for use with courses 17-22 of thirty-five included in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians, and operators; and to assist planners,…

  18. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  19. Strategic Planning for Technological Innovation in Canadian Post Secondary Education

    Directory of Open Access Journals (Sweden)

    Denise Stockley

    2004-06-01

    Full Text Available In this study, institution-wide strategic plans that were available online were examined in detail to determine how educational technology was referred to in these documents. Based on this data and the literature, a schedule of principles for supporting the implementation of educational technology in post-secondary teaching was developed. Institutions that are formatively evaluating local efforts to understand and improve technologically supported instruction can use this checklist diagnostically.

  20. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  1. Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bruce Hallbert

    2012-09-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  2. Analysing Models as a Knowledge Technology in Transport Planning

    DEFF Research Database (Denmark)

    Gudmundsson, Henrik

    2011-01-01

    Models belong to a wider family of knowledge technologies, applied in the transport area. Models sometimes share with other such technologies the fate of not being used as intended, or not at all. The result may be ill-conceived plans as well as wasted resources. Frequently, the blame for such a ......Models belong to a wider family of knowledge technologies, applied in the transport area. Models sometimes share with other such technologies the fate of not being used as intended, or not at all. The result may be ill-conceived plans as well as wasted resources. Frequently, the blame...... critical analytic literature on knowledge utilization and policy influence. A simple scheme based in this literature is drawn up to provide a framework for discussing the interface between urban transport planning and model use. A successful example of model use in Stockholm, Sweden is used as a heuristic...

  3. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  4. The optimization of operating parameters on microalgae upscaling process planning.

    Science.gov (United States)

    Ma, Yu-An; Huang, Hsin-Fu; Yu, Chung-Chyi

    2016-03-01

    The upscaling process planning developed in this study primarily involved optimizing operating parameters, i.e., dilution ratios, during process designs. Minimal variable cost was used as an indicator for selecting the optimal combination of dilution ratios. The upper and lower mean confidence intervals obtained from the actual cultured cell density data were used as the final cell density stability indicator after the operating parameters or dilution ratios were selected. The process planning method and results were demonstrated through three case studies of batch culture simulation. They are (1) final objective cell densities were adjusted, (2) high and low light intensities were used for intermediate-scale cultures, and (3) the number of culture days was expressed as integers for the intermediate-scale culture.

  5. Technology strategy for integrated operations and real time reservoir management; Technology Target Areas; TTA5 - Integrated operations and RTRM

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    In Norway Integrated Operations (IO) is a concept which in the first phase (G1) has been used to describe how to integrate processes and people onshore and offshore using ICT solutions and facilities that improve onshore's ability to support offshore operationally. The second generation (G2) Integrated Operations aims to help operators utilize vendors' core competencies and services more efficiently. Utilizing digital services and vendor products, operators will be able to update reservoir models, drilling targets and well trajectories as wells are drilled, manage well completions remotely, optimize production from reservoir to export lines, and implement condition-based maintenance concepts. The total impact on production, recovery rates, costs and safety will be profound. When the international petroleum business moves to the Arctic region the setting is very different from what is the case on the Norwegian Continental Shelf (NCS) and new challenges will arise. The Norwegian Ministry of Environment has recently issued an Integrated Management Plan for the Barents Sea where one focus is on 'Monitoring of the Marine Environment in the North'. The Government aims to establish a new and more coordinated system for monitoring the marine ecosystems in the north. A representative group consisting of the major Operators, the Service Industry, Academia and the Authorities have developed the enclosed strategy for the OG21 Integrated Operations and Real Time Reservoir Management (IO and RTRM) Technology Target Area (TTA). Major technology and work process research and development gaps have been identified in several areas: Bandwidth down-hole to surface; Sensor development including Nano-technology; Cross discipline use of Visualisation, Simulation and model development particularly in Drilling and Reservoir management areas; Software development in terms of data handling, model updating and calculation speed; Enabling reliable and robust communications

  6. Strategic Planning in Ireland's Institutes of Technology

    Science.gov (United States)

    Elwood, Larry; Rainnie, Al

    2012-01-01

    This article focuses upon Ireland's institute of technology sector, which has been transformed from a 1970s technical orientation to its broader current role of research and higher education provision. The transformational shifts experienced by institutes over the previous three decades have been profound: increased autonomy, new managerial and…

  7. Planning for Technology-Enthused Classrooms

    Science.gov (United States)

    Hirsch, Jim

    2004-01-01

    After 25 years of evolution of technology resources in schools, your leadership team, board of education and local community have finally gotten the message that these tools are here to stay and belong in every classroom for student access. A budget has been appropriated, equipment purchased, professional development completed and new curriculum…

  8. Strategic Planning in Ireland's Institutes of Technology

    Science.gov (United States)

    Elwood, Larry; Rainnie, Al

    2012-01-01

    This article focuses upon Ireland's institute of technology sector, which has been transformed from a 1970s technical orientation to its broader current role of research and higher education provision. The transformational shifts experienced by institutes over the previous three decades have been profound: increased autonomy, new managerial and…

  9. Assessment of Technology for Information Services Planning

    Science.gov (United States)

    1979-08-01

    organi- zation, and external services (external timesharing and turnkey computer systems). Areas of impact are specific to the organization. The...timesharing vendors, changing services turnkey systems - potential and problems impacts and trends o distributed data processing technology needed...includes credit cards, automobile loans, personal and real estate loans, and leasing . Service improvements would aim at expediting credit review, payment

  10. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  11. Planning Bepicolombo MPO Science Operations to study Mercury Interior

    Science.gov (United States)

    De La Fuente, Sara; Carasa, Angela; Ortiz, Iñaki; Rodriguez, Pedro; Casale, Mauro; Benkhoff, Johannes; Zender, Joe

    2017-04-01

    BepiColombo is an Interdisciplinary Cornerstone ESA-JAXA Mission to Mercury, with two orbiters, the ESA Mercury Planetary Orbiter (MPO) and the JAXA Mercury Magnetospheric Orbiter (MMO) dedicated to study of the planet and its magnetosphere. The MPO, is a three-axis-stabilized, nadir-pointing spacecraft which will be placed in a polar orbit, providing excellent spatial resolution over the entire planet surface. The MPO's scientific payload comprises 11 instrument packages, including laser altimeter, cameras and the radio science experiment that will be dedicated to the study of Mercury's interior: structure, composition, formation and evolution. The planning of the science operations to be carried out by the Mercury's interior scientific instruments will be done by the SGS located at the European Space Astronomy Centre (ESAC), in conjunction with the scientific instrument teams. The process will always consider the complete nominal mission duration, such that the contribution of the scheduled science operations to the science objectives, the total data volume generated, and the seasonal interdependency, can be tracked. The heart of the science operations planning process is the Observations Catalogue (OC), a web-accessed database to collect and analyse all science operations requests. From the OC, the SGS will first determine all science opportunity windows compatible with the spacecraft operational constraints. Secondly, only those compatible with the resources (power and data volume) and pointing constraints will be chosen, including slew feasibility.

  12. A planning framework for transferring building energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B C; Brown, M A; Mohler, B L; Wilde, M; Abel, F H

    1990-07-01

    Accelerating the adoption of new and existing cost-effective technologies has significant potential to reduce the energy consumed in US buildings. This report presents key results of an interlaboratory technology transfer planning effort in support of the US Department of Energy's Office of Building Technologies (OBT). A guiding assumption for planning was that OBT's R D program should forge linkages with existing programs whose goals involved enhancing energy efficiency in buildings. An ad hoc Technology Transfer Advisory Group reviewed the existing analysis and technology transfer program, brainstormed technology transfer approaches, interviewed DOE program managers, identified applicable research results, and developed a framework that management could use in deciding on the best investments of technology transfer resources. Representatives of 22 organizations were interviewed on their views of the potential for transferring energy efficiency technologies through active linking with OBT. The report describes these programs and interview results; outlines OBT tools, technologies, and practices to be transferred; defines OBT audiences; identifies technology transfer functions and presents a framework devised using functions and audiences; presents some 60 example technology transfer activities; and documents the Advisory Group's recommendations. 37 refs., 3 figs., 12 tabs.

  13. Armored Combat Vehicles Science and Technology Plan

    Science.gov (United States)

    1982-11-01

    analysis0 SS 94 GHz TRANSMITTER/RECEIVER MODULE Provide low cost transciever modules for pulsed, FMCW or FSK radars at 35-100 Gfz. STAC!LTZATTOU...prepared by TACOM. 3 !. ... Ill11111iilIl 0 1 lPI IPIt’IlA BEST AVAILABLE.COPY The Armored Combat Vehicle Science and Technology Base Development program...classes of Army Systems including Radar , E-O, AD. Communications, Missiles and EW. NETWORK MANAGEMENT INTEGRATION - BATTLEFIELD INFORMATION

  14. Flicker Caused by Operation of Industrial Technology

    Directory of Open Access Journals (Sweden)

    Martin Kaspirek

    2016-01-01

    Full Text Available There are more and more electrical devices operating in industrial plants which impact negatively on the distribution network. The EN 50160 standard defines the voltage characteristics of electricity supplied by the public distribution system and it is a problem for a distribution network operator when the voltage quality in the distribution network does not comply with the requirements of the EN 50160 standard because of complaints about voltage quality. Such a complaint is justified and the distribution network operator has to pay a penalty and has to remedy the situation. This paper describes a problem of flicker in the medium-voltage distribution grid when the flicker is produced by one customer operating a forging press. The remedies from the side of the distribution network operator and the customer with the aim of reducing the flicker level in the grid are described.

  15. Pre-operative planning and intra-operative guidance in modern neurosurgery: a review of 300 cases.

    Science.gov (United States)

    Wadley, J.; Dorward, N.; Kitchen, N.; Thomas, D.

    1999-01-01

    Operative neurosurgery has recently entered an exciting era of image guided surgery or neuronavigation and application of this novel technology is beginning to have a significant impact in many ways in a variety of intracranial procedures. In order to fully assess the advantages of image guided techniques over conventional planning and surgery in selected cases, detailed prospective evaluation has been carried out during the advanced development of an optically tracked neuronavigation system. Over a 2-year period, 300 operative neurosurgical procedures have been performed with the assistance of interactive image guidance, as well as the development of new software applications and hardware tools. A broad range of intracranial neurosurgical procedures were seen to benefit from image guidance, including 163 craniotomies, 53 interactive stereotactic biopsies, 7 tracked neuroendoscopies and 37 complex skull base procedures. The most common pathological diagnoses were cerebral glioma in 98 cases, meningioma in 64 and metastasis in 23. Detailed analysis of a battery of postoperative questions revealed benefits in operative planning, appreciation of anatomy, lesion location, safety of surgery and greatly enhanced surgical confidence. The authors believe that image guided surgical technology, with new developments such as those described, has a significant role to play in contemporary neurosurgery and its widespread adoption in practice will be realised in the near future. Images Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 PMID:10615186

  16. Toward Technology Integration in Mathematics Education: A Technology-Integration Course Planning Assignment

    Science.gov (United States)

    Kersaint, Gladis

    2007-01-01

    This article describes a technology integration course planning assignment that was developed to enhance preservice teachers' technological pedagogical content knowledge (TPCK). This assignment required preservice teachers work with peers to integrate various technological tools (e.g., graphing calculators, web-based mathematics applets, etc) in a…

  17. Exploring the Influence of New Technology Planning and Implementation on the Perceptions of New Technology Effectiveness

    Science.gov (United States)

    Bellamy, Al

    2007-01-01

    This study explored influences that perceptions of new technology implementation and planning processes, and dimensions of organizational climate have on perceptions of new technology deployment effectiveness. It also examined the extent to which dimensions of organizational climate moderates the relationships among new technology implementation,…

  18. Foresight for commanders: a methodology to assist planning for effects-based operations

    Science.gov (United States)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  19. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  20. Detailed Fishery Operating Plan with 1985 Operating Criteria, 1985 Annual Publication.

    Energy Technology Data Exchange (ETDEWEB)

    Karr, Malcolm H.

    1985-03-31

    This plan (DFOP) is designed as a working document to guide decisions and actions for achieving Columbia Basin Fish and Wildlife Program measures and fishery objectives to improve the survival of migrant salmon and steelhead. The DFOP outlines current fishery objectives, research findings, and systems operational constraints in the Columbia River Basin. Together, program measures, fishery objectives, research findings, and system constraints form the foundation for the project specific operations recommendations in the DFOP.

  1. Science observation and operation plans of BepiColombo MMO

    Science.gov (United States)

    Murakami, Go; Fujimoto, Masaki

    2016-04-01

    BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The baseline mission consists of two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The two orbiters will be launched in 2017 by an Ariane-5 and arrive at Mercury in 2024. JAXA is responsible for the development and operations of MMO, while ESA is responsible for the development and operations of MPO as well as the launch, transport, and the insertion of two spacecraft into their dedicated orbits. Being a spin-stabilized spacecraft, MMO has much less constraint for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. However, MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part (~20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we must optimize the science observation and downlink plans in detail. In this paper, we summarize the basic plans and strategies of MMO science operations.

  2. FY97 Geophysics Technology Area Plan.

    Science.gov (United States)

    1997-03-01

    Under the High-frequency Active Auroral Research drag and to provide accurate winds and composition Program ( HAARP ), research was initiated to assess...Satellite Communications FY Fiscal Year GP Geophysics GPS Global Positioning System HAARP High Frequency Active Auroral Research Program BF High...and Combat Operations 3,14 Global Positioning System (GPS) ii,5,6,8,9,12,17 High Frequency Active Auroral Research Program ( HAARP ) 8,11 Industrial

  3. Medical Information Technology in Support of the Operational Commander.

    Science.gov (United States)

    2007-11-02

    There are numerous factors that have driven the. need for medical information technology in the operational setting. Two of the primary driving...through retirement. The FHP strategy thrusts preventive medicine and information technology into the forefront of operational health support...paper will deal with the medical information technology portion of the Force Health Protection program. This paper will discuss the pros and cons of

  4. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Powell, H.T.; Kilkenny, J.D. [eds.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program.

  5. A dynamic programming model for optimal planning of aquifer storage and recovery facility operations

    Science.gov (United States)

    Uddameri, V.

    2007-01-01

    Aquifer storage recovery (ASR) is an innovative technology with the potential to augment dwindling water resources in regions experiencing rapid growth and development. Planning and design of ASR systems requires quantifying how much water should be stored and appropriate times for storage and withdrawals within a planning period. A monthly scale planning model has been developed in this study to derive optimal (least cost) long-term policies for operating ASR systems and is solved using a recursive deterministic dynamic programming approach. The outputs of the model include annual costs of operation, the amount of water to be imported each month as well as the schedule for storage and extraction. A case study modeled after a proposed ASR system for Mustang Island and Padre Island service areas of the city of Corpus Christi is used to illustrate the utility of the developed model. The results indicate that for the assumed baseline demands, the ASR system is to be kept operational for a period of 4 months starting from May through August. Model sensitivity analysis indicated that increased seasonal shortages can be met using ASR with little additional costs. For the assumed cost structure, a 16% shortage increased the costs by 1.6%. However, the operation time of ASR increased from 4 to 8 months. The developed dynamic programming model is a useful tool to assess the feasibility of evaluating the use of ASR systems during regional-scale water resources planning endeavors.

  6. DEVELOPMENT OF INFORMATION TECHNOLOGY STRATEGIC PLANNING FOR MANUFACTURING INDUSTRY (CASE STUDY: PT MCM

    Directory of Open Access Journals (Sweden)

    Leonardus Hardjo

    2013-10-01

    Full Text Available IT Department in PT MCM has to carry out the duties and functions of developing solution to support the business unit in their operation and gain some benefits which should be obtained by using IT in manufacturing such as increasing efficiency, improving the effectivity in making decision and helping to promote the products. This study aims to design information technology strategic planning in accordance with the strategic plan. The research method is using the IT Strategic Planning framework of Alex Cullen and Marc Cecere. This study uses SWOT and IT Balanced Scorecard to analyze the needs of IT at PT MCM. The results of this study are recommended strategic steps to optimize the implementation of IT in the company to improve the performance from IT division to obtain the benefits by implementing IT in manufacturing and to form IT Blueprint, which is part of the information technology strategic plan in PT MCM.

  7. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  8. Technology Reference Model (TRM) Reports: Technology/Operating System Report

    Data.gov (United States)

    Department of Veterans Affairs — The One VA Enterprise Architecture (OneVA EA) is a comprehensive picture of the Department of Veterans Affairs' (VA) operations, capabilities and services and the...

  9. Defense Technology Objectives of the Joint Warfighting Science and Technology and Defense Technology Area Plan.

    Science.gov (United States)

    1996-05-01

    occlusion , multipath etc.) through the use of inertial measurement systems (Interferometric Fiber Optic Gyro, Dynamically Tuned Gyro) and will...management systems provide mobile and semi- mobile assets (e.g., Abrams, Theater Missile Defense - TMD ) with low cost, low burden survivability...technology for development of an operational high energy Airborne Laser (ABL) for Theater Missile Defense ( TMD ). Address risk reduction issues for develop

  10. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  11. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  12. Crisis Management- Operational Logistics & Asset Visibility Technologies

    Science.gov (United States)

    2006-06-01

    United States maintains the only truly global, fully-operational system. However, the European Union and countries including Russia, Japan and China ...http://java.sun.com/developer/technicalArticles/ Ecommerce /rfid/ Microsoft. (2006). Hand-held RFID Reader. Retrieved May 11, 2006, from http

  13. Decision support for simulation-based operation planning

    Science.gov (United States)

    Schubert, Johan; Hörling, Pontus

    2016-05-01

    In this paper, we develop methods for analyzing large amounts of data from a military ground combat simulation system. Through a series of processes, we focus the big data set on situations that correspond to important questions and show advantageous outcomes. The result is a decision support methodology that provides commanders with results that answer specific questions of interest, such as what the consequences for the Blue side are in various Red scenarios or what a particular Blue force can withstand. This approach is a step toward taking the traditional data farming methodology from its analytical view into a prescriptive operation planning context and a decision making mode.

  14. Operational Planning Tools for U.S. Navy Maritime Commanders

    OpenAIRE

    Gerald G. Brown; Carlyle, Matthew W.; Kelton, David; Kline, Jeffrey; Salmeron, Javier

    2009-01-01

    Brown, G., Carlyle, W.M., Kelton, D., Kline, J. and Salmerón, J., 2009, “Operational Planning Tools for U.S. Navy Maritime Commanders,” in refereed conference proceedings of International Conference on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, Bruzzone, A., Cunha, G. Martínez, R. and Merkuryev, Y., eds., Universidad de La Laguna, Tenerife, Spain. ISBN 978-84-692-5416-5. This work presents recent research to develop a series of optimization- and simulation-based dec...

  15. Low-temperature thermal energy storage program annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H. W.; Eissenberg, D. M.

    1979-01-01

    The LTTES program operating plans for FY 1978 are described in terms of general program objectives and the technical activities being implemented to achieve these objectives. The program structure provides emphasis on several principal thrusts; namely, seasonal thermal storage, daily/short-term thermal storage, and waste heat recovery and reuse. A work breakdown structure (WBS) organizes the efforts being carried out in-house or through subcontract within each thrust area. Fiscal data are summarized in respect to thrust area, individual efforts, and funding source.

  16. Orthognathic positioning system: intraoperative system to transfer virtual surgical plan to operating field during orthognathic surgery.

    Science.gov (United States)

    Polley, John W; Figueroa, Alvaro A

    2013-05-01

    To introduce the concept and use of an occlusal-based "orthognathic positioning system" (OPS) to be used during orthognathic surgery. The OPS consists of intraoperative occlusal-based devices that transfer virtual surgical planning to the operating field for repositioning of the osteotomized dentoskeletal segments. The system uses detachable guides connected to an occlusal splint. An initial drilling guide is used to establish stable references or landmarks. These are drilled on the bone that will not be repositioned adjacent to the osteotomy line. After mobilization of the skeletal segment, a final positioning guide, referenced to the drilled landmarks, is used to transfer the skeletal segment according to the virtual surgical planning. The OPS is digitally designed using 3-dimensional computer-aided design/computer-aided manufacturing technology and manufactured with stereolithographic techniques. Virtual surgical planning has improved the preoperative assessment and, in conjunction with the OPS, the execution of orthognathic surgery. The OPS has the possibility to eliminate the inaccuracies commonly associated with traditional orthognathic surgery planning and to simplify the execution by eliminating surgical steps such as intraoperative measuring, determining the condylar position, the use of bulky intermediate splints, and the use of intermaxillary wire fixation. The OPS attempts precise translation of the virtual plan to the operating field, bridging the gap between virtual and actual surgery. Copyright © 2013 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  17. Incorporating operational flexibility into electric generation planning Impacts and methods for system design and policy analysis

    Science.gov (United States)

    Palmintier, Bryan S.

    This dissertation demonstrates how flexibility in hourly electricity operations can impact long-term planning and analysis for future power systems, particularly those with substantial variable renewables (e.g., wind) or strict carbon policies. Operational flexibility describes a power system's ability to respond to predictable and unexpected changes in generation or demand. Planning and policy models have traditionally not directly captured the technical operating constraints that determine operational flexibility. However, as demonstrated in this dissertation, this capability becomes increasingly important with the greater flexibility required by significant renewables (>= 20%) and the decreased flexibility inherent in some low-carbon generation technologies. Incorporating flexibility can significantly change optimal generation and energy mixes, lower system costs, improve policy impact estimates, and enable system designs capable of meeting strict regulatory targets. Methodologically, this work presents a new clustered formulation that tractably combines a range of normally distinct power system models, from hourly unit-commitment operations to long-term generation planning. This formulation groups similar generators into clusters to reduce problem size, while still retaining the individual unit constraints required to accurately capture operating reserves and other flexibility drivers. In comparisons against traditional unit commitment formulations, errors were generally less than 1% while run times decreased by several orders of magnitude (e.g., 5000x). Extensive numerical simulations, using a realistic Texas-based power system show that ignoring flexibility can underestimate carbon emissions by 50% or result in significant load and wind shedding to meet environmental regulations. Contributions of this dissertation include: 1. Demonstrating that operational flexibility can have an important impact on power system planning, and describing when and how these

  18. 2007 Pacific Operational Science and Technology Conference

    Science.gov (United States)

    2007-04-04

    Infantry, 25th ID SFC Mario Miramontiz, USA, 1-21 Infantry, 25th ID SGM George Garcia , USA, 1-21 Infantry, 25th ID SMSgt John Anipe, USAF, 25th...Hooks S&T-Transition@dhs.gov Starnes Walker S&T-Research@dhs.gov Roger McGinnis S&T-Innovation@dhs.gov Lil Ramirez S&T-InternationalPrograms@dhs.gov 38...Our S&T Partners Israel USA Sweden France Norway UK Germany Australia India Singapore Singapore Australia UK USFrance Defence Technology Office

  19. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  20. Training Teachers to Use Technology: The Alabama Plan.

    Science.gov (United States)

    McFadden, Anna C.; Johnson, Eddie

    1993-01-01

    Discusses the need for teacher training in media use and describes a plan developed in Alabama consisting of a three-course sequence in technology for teacher education that can be incorporated into a master's degree program. Required primary computer skills and primary instructional design skills are listed. (Contains three references.) (LRW)

  1. Maslow and Motherboards: Taking a Hierarchical View of Technology Planning.

    Science.gov (United States)

    Johnson, Doug

    2003-01-01

    Presents a planning model for educational uses of technology that is based on Maslow's hierarchy of needs. Topics include established infrastructure; effective administration; extensive resources; enhanced teaching, including creating distance learning opportunities; empowered students, including evaluation methods and information literacy skills;…

  2. Maslow and Motherboards: Taking a Hierarchical View of Technology Planning.

    Science.gov (United States)

    Johnson, Doug

    2003-01-01

    Presents a planning model for educational uses of technology that is based on Maslow's hierarchy of needs. Topics include established infrastructure; effective administration; extensive resources; enhanced teaching, including creating distance learning opportunities; empowered students, including evaluation methods and information literacy skills;…

  3. Advanced Education and Technology Business Plan, 2009-12. Highlights

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2009

    2009-01-01

    Advanced Education and Technology provides strategic leadership for the development of the next generation economy in Alberta through the provision of accessible, affordable and quality learning opportunities for all Albertans and support for a dynamic and integrated innovation system. This paper provides the highlights of the business plan of the…

  4. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  5. Information Technology Investment Strategy Planning: Balance Scorecard Approach

    Directory of Open Access Journals (Sweden)

    Henny Hendarti

    2011-05-01

    Full Text Available Purpose of this research are to prepare the IT investment strategy using Balanced Scorecard approach in the company where the appropriate planning of this IT investment strategy can maximize the competitive benefit in the company, and it also to recommended a strategy of IT investment that can be implemented and measure the rate of return from the IT investment in the company. Research Method used book studies, field studies, and analysis system. Book studies from the books and journal. Field studies done by observation, interview, and questioner, and analysis system done by analyzed the ongoing system in the company. The result from this analysis is a recommendation in investment IT such as sales module, payment module, and report module. Then for the conclusion, this information technology investment planning can be develop to another investment implementation such authorized website of the company and using PDA (Personal Digital AssistantIndex Terms - Planning, Information Technology, Investment, Balance Scorecard

  6. Planning Pharmacies: An Operational Method to Find the Best Location

    Directory of Open Access Journals (Sweden)

    Simona Tondelli

    2014-05-01

    Full Text Available The theme of the spatial distribution of the pharmacies on the territory is closely connected to urban planning and to services supply. In Italy, the regulatory change that took place in 2012, triggered partly by the need to adhere more to a constantly changing economic system, has led to a revision of the existing situation, consisting both on the method to quantify the pharmacies distribution and on the efficiency of the service. If Law 27/2012 has effectively allowed municipalities to increase the number of pharmacies that they can settle on the municipal territory, it has also started a process of rethinking the logic of pharmacies location and of their catchment areas. In this framework, the present paper aims to discuss the merits of a regulatory evolutions that sparked the process of liberalization of locations, integrating the law guidelines and goals with an operating logic process, usable and useful to translate goals into planning actions in a continuous dialogue between law and territory, constraints and opportunities, equity and accessibility of the care services. Following this logic operations, we have investigated the urban context of Castelfranco Emilia, assuming the location of new offices on the basis of pharmaceutical analyzes.

  7. Red Team Operations to Assess Information Technology Vulnerabilities

    NARCIS (Netherlands)

    Veltman, M.; Parker, R.L.

    1999-01-01

    All Information and Communication Technology (ICT) systems have vulnerabilities. Weaknesses in these systems are introduced either during the specification, implementation or operational phase. Leaving aside these introduced vulnerabilities are intentional or unintentional, the fact remains that the

  8. NASA ATP Force Measurement Technology Capability Strategic Plan

    Science.gov (United States)

    Rhew, Ray D.

    2008-01-01

    The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.

  9. Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

    Energy Technology Data Exchange (ETDEWEB)

    Elaine Hale, Brady Stoll, and Trieu Mai

    2016-05-01

    Power systems of the future are likely to require additional flexibility due to the operating characteristics of many clean energy technologies, particularly those relying on renewable energy sources. This subject has been well studied from an operational perspective, but it has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. The primary purpose of this report is to present new capabilities that were developed for a particular CEM, NREL's Resource Planning Model (RPM), to better reflect the impact of variable wind and solar generation on system operations and resource adequacy, and, complementarily, to model energy-constrained flexibility resources.

  10. 36 CFR 9.40 - Supplementation or revision of plan of operations.

    Science.gov (United States)

    2010-07-01

    ... of plan of operations. 9.40 Section 9.40 Parks, Forests, and Public Property NATIONAL PARK SERVICE... revision of plan of operations. (a) A proposal to supplement or revise an approved plan of operations may... to address conditions not previously contemplated by notifying the appropriate party in writing...

  11. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  12. Information Technology In Supply Chain Operations: A Road Map ...

    African Journals Online (AJOL)

    Information Technology In Supply Chain Operations: A Road Map To Success. ... map to successful implementation of Information Technology (IT) to Supply Chain ... of critical success factors, the role of IT in SCM and the overall benefits which ... stressing that connecting numerous information systems and integrating data ...

  13. A Literature Review on Operator Interface Technologies for Network Enabled Operational Environments Using Complex System Analysis

    Science.gov (United States)

    2009-05-30

    results were summarized with pros and cons of different technologies for interface design purposes. 2 Résumé Une analyse documentaire a été...Enabled Operational Environments Using Complex System Analysis (U) Une analyse documentaire sur les technologies d’interface opérateur pour les...different technologies for interface design purposes. (U) Une analyse documentaire a été menée pour examiner les technologies d’interface de pointe

  14. Towed and AUV Technologies for Arctic Operations

    Science.gov (United States)

    Singh, H.; Eustice, R.; Humphris, S.; Jakuba, M.; Kunz, C.; Murphy, C.; Nakamura, K.; Reves-Sohn, R.; Roman, C.; Sato, T.; Shank, T.; Willis, C.

    2007-12-01

    The 2007 AGAVE expedition included a suite of vehicles specifically designed and adapted for under-ice operations. These include the towed vehicle CAMPER, and the Puma and Jaguar autonomous underwater vehicles. The CAMPER (CAMera and samPlER) towed system was designed for high resolution imaging and sampling of the seafloor. It utilizes the oceanographic standard 0.68" electro-optical cable with three fibers and three copper conducting cables. The system consists of five cameras - a bottom looking high definition camera, a forward looking high definition camera system, a forward looking obstacle avoidance camera, a pan and tilt driving camera and a camera for instrumentation- and associated HMI and HID lighting systems. Sampling is accomplished by two hydraulically actuated systems. One of the samplers is a clam shell bucket design that is primarily intended for sampling rocks and sessile biological organisms. The other sampler uses a suction based mechanism and is intended for sampling fluids and motile biological organisms. The two AUVs, Puma and Jaguar, are identical in their base design but were outfitted with different sensor suites. These vehicles are a two hull design with most of the weight in the lower hull and most of the floatation in the top hull yielding a design that is passively stable in pitch and roll. Three thrusters, one for the vertical axis and two main thrusters allow for decoupled control in the vertical and horizontal axes. The 6 kWH battery packs are good for 24 hour operations. Both vehicles are equipped with acoustic modems, four channel long baseline receivers, doppler velocity logs, a high resolution depth sensor, three axes north seeking fiber optic gyroscopes and a pumped CTD. In addition, Puma, which is intended primarily for mid-water column work, also supports an Eh sensor, an optical backscatter sensor and an experimental long range optical backscatter sensor. The Jaguar vehicle, with a focus on near bottom measurements, is

  15. Optimizing and controlling earthmoving operations using spatial technologies

    Science.gov (United States)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object

  16. Technology strategy for integrated operations and real time reservoir management; Technology Target Areas; TTA5 - Integrated operations and RTRM

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    In Norway Integrated Operations (IO) is a concept which in the first phase (G1) has been used to describe how to integrate processes and people onshore and offshore using ICT solutions and facilities that improve onshore's ability to support offshore operationally. The second generation (G2) Integrated Operations aims to help operators utilize vendors' core competencies and services more efficiently. Utilizing digital services and vendor products, operators will be able to update reservoir models, drilling targets and well trajectories as wells are drilled, manage well completions remotely, optimize production from reservoir to export lines, and implement condition-based maintenance concepts. The total impact on production, recovery rates, costs and safety will be profound. When the international petroleum business moves to the Arctic region the setting is very different from what is the case on the Norwegian Continental Shelf (NCS) and new challenges will arise. The Norwegian Ministry of Environment has recently issued an Integrated Management Plan for the Barents Sea where one focus is on 'Monitoring of the Marine Environment in the North'. The Government aims to establish a new and more coordinated system for monitoring the marine ecosystems in the north. A representative group consisting of the major Operators, the Service Industry, Academia and the Authorities have developed the enclosed strategy for the OG21 Integrated Operations and Real Time Reservoir Management (IO and RTRM) Technology Target Area (TTA). Major technology and work process research and development gaps have been identified in several areas: Bandwidth down-hole to surface; Sensor development including Nano-technology; Cross discipline use of Visualisation, Simulation and model development particularly in Drilling and Reservoir management areas; Software development in terms of data handling, model updating and calculation speed; Enabling reliable and robust communications

  17. 78 FR 18674 - Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

    Science.gov (United States)

    2013-03-27

    ..., Development and Technology Strategic Plan (2013-2018) AGENCY: Research and Innovative Technology.... Department of Transportation, Research, Development and Technology Strategic Plan FY 2013-2018. The new five-year strategic plan will guide the Department's research, development, and technology activities...

  18. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  19. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  20. Implementation plan for WRAP Module 1 operational readiness review

    Energy Technology Data Exchange (ETDEWEB)

    Irons, L.G.

    1994-11-04

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

  1. Clinical operations generation next… The age of technology and outsourcing

    Directory of Open Access Journals (Sweden)

    Priya Temkar

    2015-01-01

    Full Text Available Huge cost pressures and the need to drive faster approvals has driven a technology transformation in the clinical trial (CT industry. The CT industry is thus leveraging mobile data, cloud computing, social media, robotic automation, and electronic source to drive efficiencies in a big way. Outsourcing of clinical operations support services to technology companies with a clinical edge is gaining tremendous importance. This paper provides an overview of current technology trends, applicable Food and Drug Administration (FDA guidelines, basic challenges that the pharma industry is facing in trying to implement such changes and its shift towards outsourcing these services to enable it to focus on site operations.

  2. Clinical operations generation next… The age of technology and outsourcing.

    Science.gov (United States)

    Temkar, Priya

    2015-01-01

    Huge cost pressures and the need to drive faster approvals has driven a technology transformation in the clinical trial (CT) industry. The CT industry is thus leveraging mobile data, cloud computing, social media, robotic automation, and electronic source to drive efficiencies in a big way. Outsourcing of clinical operations support services to technology companies with a clinical edge is gaining tremendous importance. This paper provides an overview of current technology trends, applicable Food and Drug Administration (FDA) guidelines, basic challenges that the pharma industry is facing in trying to implement such changes and its shift towards outsourcing these services to enable it to focus on site operations.

  3. Clinical operations generation next… The age of technology and outsourcing

    Science.gov (United States)

    Temkar, Priya

    2015-01-01

    Huge cost pressures and the need to drive faster approvals has driven a technology transformation in the clinical trial (CT) industry. The CT industry is thus leveraging mobile data, cloud computing, social media, robotic automation, and electronic source to drive efficiencies in a big way. Outsourcing of clinical operations support services to technology companies with a clinical edge is gaining tremendous importance. This paper provides an overview of current technology trends, applicable Food and Drug Administration (FDA) guidelines, basic challenges that the pharma industry is facing in trying to implement such changes and its shift towards outsourcing these services to enable it to focus on site operations. PMID:26623386

  4. Technology Partnership Program fiscal year 1998 program plan

    Energy Technology Data Exchange (ETDEWEB)

    Ford, R.

    1997-09-15

    The Oak Ridge Y-12 Plant will use the Technology Partnership Program to support the DOE nuclear weapons complex (NWC), particularly at the Oak Ridge Y-12 Plant. This support will be achieved through partnerships with industry that enhance the science and technology base and the core capabilities necessary to meet current and future weapons program mission needs. This program will enhance the Weapons Complex technology base and core capabilities by participating, in diversified portfolios of collaborative projects with industrial. The Y-12 Technology Partnership Program (TPP) closely aligns its program with the goals, objectives, and strategies of the DP Stockpile Stewardship and Management plans and DOE technology transfer policy. The Y-12 Defense Programs Office is the primary customer of the Y-12 TPP, and provides input to program planning and execution. Industry involvement is also an essential component. Programs and projects within the Y-12 TPP are responsive to identified weapons complex mission needs. In FY98 the Y-12 TPP will execute the plan devised during FY97 which emphasized the program`s increasing focus on providing benefits to DP. This plan called for the soft-landing of four terminated projects early in FY97 and the normal conclusion of four others at various times throughout the year. Successful conclusion of these projects enabled a call for new TPP projects in FY98 with clearer Defense Program benefits. The Defense Programs benefits were assured by the participation of Y-12`s Weapon Advisory Council, which met to determine proposal guidelines and criteria. The Weapons Advisory Council later met to rank each proposal against the established guidelines assuring those proposals with the best DP benefits would be chosen. The goal for the Y-12 TPP program will be to successfully implement the winning proposals in the first quarter of FY98 and maintain administrative and fiscal control over these and continuing projects.

  5. Technology Partnership Program fiscal year 1998 program plan

    Energy Technology Data Exchange (ETDEWEB)

    Ford, R.

    1997-09-15

    The Oak Ridge Y-12 Plant will use the Technology Partnership Program to support the DOE nuclear weapons complex (NWC), particularly at the Oak Ridge Y-12 Plant. This support will be achieved through partnerships with industry that enhance the science and technology base and the core capabilities necessary to meet current and future weapons program mission needs. This program will enhance the Weapons Complex technology base and core capabilities by participating, in diversified portfolios of collaborative projects with industrial. The Y-12 Technology Partnership Program (TPP) closely aligns its program with the goals, objectives, and strategies of the DP Stockpile Stewardship and Management plans and DOE technology transfer policy. The Y-12 Defense Programs Office is the primary customer of the Y-12 TPP, and provides input to program planning and execution. Industry involvement is also an essential component. Programs and projects within the Y-12 TPP are responsive to identified weapons complex mission needs. In FY98 the Y-12 TPP will execute the plan devised during FY97 which emphasized the program`s increasing focus on providing benefits to DP. This plan called for the soft-landing of four terminated projects early in FY97 and the normal conclusion of four others at various times throughout the year. Successful conclusion of these projects enabled a call for new TPP projects in FY98 with clearer Defense Program benefits. The Defense Programs benefits were assured by the participation of Y-12`s Weapon Advisory Council, which met to determine proposal guidelines and criteria. The Weapons Advisory Council later met to rank each proposal against the established guidelines assuring those proposals with the best DP benefits would be chosen. The goal for the Y-12 TPP program will be to successfully implement the winning proposals in the first quarter of FY98 and maintain administrative and fiscal control over these and continuing projects.

  6. Screening family planning needs: an operations research project in Guatemala

    Directory of Open Access Journals (Sweden)

    Burkhart Marianne

    2004-05-01

    Full Text Available Abstract Background Public sector health care providers in rural Guatemala have infrequently offered family planning information and services in routine visits. This operations research project tested a strategy to modify certain practices that prevent health workers from proactively screening clients' needs and meeting them. Methods The research design was quasi-experimental with a pretest-posttest-follow-up comparison group design. Health districts, which comprise health centers and posts, were purposively assigned to intervention or comparison groups to assure comparability of the two groups. The strategy was based on a job-aid designed to guide health workers in screening clients' reproductive intentions and family planning needs, help them to offer contraceptive methods if the woman expressed interest, and facilitate the provision of the method chosen at the time of the visit. The strategy was implemented at intervention sites during a period of six months. Upon completion of post-intervention measurements, the strategy was scaled up to the comparison sites, and a follow-up assessment was conducted nine months later. Results were evaluated by conducting three rounds of exit interviews with women exposed to the risk of unwanted pregnancy. Results Study results showed a two to five-fold increase in providers' screening of clients' reproductive intentions. The proportion of clients who received information about contraceptives increased from 8% at the baseline to 42% immediately post-intervention, and 36% at the follow-up survey. The intervention also proved successful in improving the role service providers play in offering women a chance to ask questions and assisting women in making a selection. The proportion of women who received a method, referral or appointment increased and remained high in the intervention group, although no change was seen in the comparison group after their participation in the strategy. Conclusion The easy

  7. The application of digital medical 3D printing technology on tumor operation

    Science.gov (United States)

    Chen, Jimin; Jiang, Yijian; Li, Yangsheng

    2016-04-01

    Digital medical 3D printing technology is a new hi-tech which combines traditional medical and digital design, computer science, bio technology and 3D print technology. At the present time there are four levels application: The printed 3D model is the first and simple application. The surgery makes use of the model to plan the processing before operation. The second is customized operation tools such as implant guide. It helps doctor to operate with special tools rather than the normal medical tools. The third level application of 3D printing in medical area is to print artificial bones or teeth to implant into human body. The big challenge is the fourth level which is to print organs with 3D printing technology. In this paper we introduced an application of 3D printing technology in tumor operation. We use 3D printing to print guide for invasion operation. Puncture needles were guided by printed guide in face tumors operation. It is concluded that this new type guide is dominantly advantageous.

  8. A Foundation for Operational Planning: The Concepts of Center of Gravity, Decisive Point, and the Culminating Point.

    Science.gov (United States)

    1987-04-21

    and the spring thaw. Southwestern Front farces Included the 6th Irug (40,566 menI 46 tanks), the I1st Wuards Bring (70,811 men), Moble Girup Papau...theiatn preced seulplning httoialeamls. Odfertiaons CUReR the paucity of aircraft, technology , or doctrine, concentrated armored forces produced the...with respect to theoretical concepts provides Insights for operational planning on the contemperarg battlefield. Technological and doctrinal

  9. Generating technology assessment. Phase I work plan, Task 1 report

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-15

    A plan of work outlining information to assess electric generating technologies is presented. Projections are made of realistic and understandable engineering and cost assessments of nonnuclear electrical generating technologies. A computer-based method of producing such engineering and cost estimates for use by EIA's Coal and Electric Power Analysis Division is to be developed and implemented. Technologies and processes to be assessed are: all nonnuclear conventional and nonconventional (coal gasification, advanced combustion turbines, atmospheric fluidized bed combustion, fuel cells, geothermal, solar thermal and photovoltaics, biomass conversion to electricity, ocean thermal, wind, and MHD). Engineering specifications recommended for determination are listed. Compatibility of the technologies are to be assessed with EIA models: MEFS, LEAP, and NCM.

  10. Wind farm operation planning using optimal pitch angle pattern (OPAP)

    Energy Technology Data Exchange (ETDEWEB)

    Moskalenko, Natalia S.; Rudion, K. [Magdeburg Univ. (Germany). Chair for Electric Power Networks and Renewable Energy Sources

    2011-07-01

    This paper presents the possibilities of optimal operation planning to maximize the energy production from a wind farm based on optimal pitch angle pattern (OPAP). The current status of this work is to investigate the influence of the pitch angle adaptation of single wind turbines (WTs) on the overall energy yield of the farm. The approach proposed in this paper assumes a selective change of the pitch angle of the chosen WTs from the optimal value, which corresponds to the maximal utilization of kinetic energy from the wind flow, in order to minimize wake effect influence on the overall energy yield of the farm. In this paper the fundamental assumptions of the proposed approach will be specified and the calculation algorithm will be presented. Furthermore, an exemplary test system will be defined and chosen scenarios will be calculated in order to show the potentials of the OPAP method. (orig.)

  11. Study plan for critical renewable energy storage technology (CREST)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Now is the time to plan to integrate significant quantities of distributed renewable energy into the electricity grid. Concerns about climate change, the adoption of state-level renewable portfolio standards and incentives, and accelerated cost reductions are driving steep growth in U.S. renewable energy technologies. The number of distributed solar photovoltaic (PV) installations and wind farms are growing rapidly. The potential for concentrated solar power (CSP) also continues to grow. As renewable energy technologies mature, they can provide a significant share of our nation’s electricity requirements.

  12. Research and technology objectives and plans: Summary fiscal year 1991

    Science.gov (United States)

    1991-01-01

    This publication represents the NASA research and technology program for FY 1991. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and in universities. The first section contains citations and abstracts of the RTOP's and is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  13. Long life Regenerative Fuel Cell technology development plan

    Science.gov (United States)

    Littman, Franklin D.; Cataldo, Robert L.; Mcelroy, James F.; Stedman, Jay K.

    1992-01-01

    This paper summarizes a technology roadmap for completing advanced development of a Proton Exchange Membrane (PEM) Regenerative Fuel Cell (RFC) to meet long life (20,000 hrs at 50 percent duty cycle) mobile or portable power system applications on the surface of the moon and Mars. Development of two different sized RFC power system modules is included in this plan (3 and 7.5 kWe). A conservative approach was taken which includes the development of a Ground Engineering System, Qualification Unit, and Flight Unit. This paper includes a concept description, technology assessment, development issues, development tasks, and development schedule.

  14. National rf technology research and development program plan

    Energy Technology Data Exchange (ETDEWEB)

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data.

  15. Marketing Plan for the National Security Technology Incubator

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-03-31

    This marketing plan was developed as part of the National Security Preparedness Project by the Arrowhead Center of New Mexico State University. The vision of the National Security Technology Incubator program is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety and security. The plan defines important aspects of developing the incubator, such as defining the target market, marketing goals, and creating strategies to reach the target market while meeting those goals. The three main marketing goals of the incubator are: 1) developing marketing materials for the incubator program; 2) attracting businesses to become incubator participants; and 3) increasing name recognition of the incubator program on a national level.

  16. Office of Building Technologies evaluation and planning report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, B.

    1994-06-01

    The US Department of Energy (DOE) Office of Building Technologies (OBT) encourages increased efficiency of energy use in the buildings sector through the conduct of a comprehensive research program, the transfer of research results to industry, and the implementation of DOE`s statutory responsibilities in the buildings area. The planning and direction of these activities require the development and maintenance of database and modeling capability, as well as the conduct of analyses. This report summarizes the results of evaluation and planning activities undertaken on behalf of OBT during the past several years. It provides historical data on energy consumption patterns, prices, and building characteristics used in OBT`s planning processes, and summaries of selected recent OBT analysis activities.

  17. Office of Building Technologies evaluation and planning report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, B.

    1994-06-01

    The US Department of Energy (DOE) Office of Building Technologies (OBT) encourages increased efficiency of energy use in the buildings sector through the conduct of a comprehensive research program, the transfer of research results to industry, and the implementation of DOE`s statutory responsibilities in the buildings area. The planning and direction of these activities require the development and maintenance of database and modeling capability, as well as the conduct of analyses. This report summarizes the results of evaluation and planning activities undertaken on behalf of OBT during the past several years. It provides historical data on energy consumption patterns, prices, and building characteristics used in OBT`s planning processes, and summaries of selected recent OBT analysis activities.

  18. Aligning business and information technology domains: strategic planning in hospitals.

    Science.gov (United States)

    Henderson, J C; Thomas, J B

    1992-01-01

    This article develops a framework for strategic information technology (IT) management in hospitals, termed the Strategic Alignment Model. This model is defined in terms of four domains--business strategy, IT strategy, organizational infrastructure, and IT infrastructure--each with its constituent components. The concept of strategic alignment is developed using two fundamental dimensions--strategic fit and integration. Different perspectives that hospitals use for aligning the various domains are discussed, and a prescriptive model of strategic IT planning is proposed.

  19. Information technologies of strategic planning in raw-material region

    Directory of Open Access Journals (Sweden)

    Sergey Mikhaylovich Lavlinskiy

    2013-09-01

    Full Text Available The article is devoted to a problem discussion of technology formation for development of strategy and program of socio-economic development of the raw-material region. The methodology of indicative planning is offered as the essence of such technology. The modeling tools should be developed according to a trajectory of sustainable development. The mechanism of management decision development using models of regional indicative planning and providing balances of labor and material resources, and also the financial balance of actions is developed. The approach based on the repeated problem solving of developing territory according a trajectory of sustainable development for several sets of scenarios of external conditions is offered for a strategy generation of resource region development. The set of indicative plans received during problem solution allows interpreting the found tendencies and making on this basis the management decision good for external conditions changing, balance and productivity. The examples of such approach implementation for some regions showing a technique of efficient administration development during strategic planning are given.

  20. NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

    Science.gov (United States)

    Baxley, Brian T.; Swenson, Harry N.; Prevot, Thomas; Callantine, Todd J.

    2012-01-01

    This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  1. Savannah River Reactor Operation: Indices of risk for emergency planning

    Energy Technology Data Exchange (ETDEWEB)

    O' Kula, K.R.; East, J.M.

    1990-10-01

    Periodically it is necessary to re-examine the implications of new source terms for neighboring offsite populations as Probabilistic Risk Assessment (PRA) and Severe Accident studies mature, and lead to a better understanding of the progression of hypothetical core melt accidents in the Savannah River Site (SRS) reactors. In this application multiple-system failure, low-frequency events, and consequently higher radiological source terms than from normal operation or design basis accidents (DBAs) are considered. Measures of consequence such as constant dose vs distance, boundary doses, and health effects to close-in populations are usually examined in this context. A set of source terms developed for the Safety Information Document (SID) for support of the Reactor Operation Environmental Impact Statement (EIS) forms the basis for the revised risk evaluation discussed herein. The intent of this review is not to completely substantiate the sufficiency of the current Emergency Planning Zone (EPZ). However, the two principal measures (200-rem red-bone marrow dose vs distance and 300-rem thyroid dose vs distance) for setting an EPZ are considered. Additional dose-at-distance calculations and consideration of DBA doses would be needed to complete a re-evaluation of the current EPZ. These subject areas are not addressed in the current document. Also, this report evaluates the sensitivity of individual risk estimates to the extent of offsite evacuation assumed from a K reactor severe accident and compares these risks to the Draft DOE Safety Guidelines. 14 refs., 8 figs., 4 tabs.

  2. Business planning innovative projects: the essence of technology, advantages and disadvantages

    Directory of Open Access Journals (Sweden)

    S.V. Knyaz

    2012-06-01

    Full Text Available The article substantiates the necessity to develop technology business planning innovative projects. Arguments made by the ground analysis of the advantages and disadvantages of existing business planning technologies.

  3. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder...

  4. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    9 Decoder 1955 indicates for each unit a two digit numbal which is to be appended to the designation SNF in order to identify the ship _ or unit for...Center) XWAJALEIN D-3_ Annex D to OTG 7.3 No -1-56 SEARCH AND RESCUE PLAN b. Comunications . An specified in reference (b) and Annex E of this-Operation...satisfactory comunications should be employed to transmit CONFIDENTIAL traffic when necessary to transmit visually in the clear. a, Vessels having three or

  5. USGS Information Technology Strategic Plan: Fiscal Years 2007-2011

    Science.gov (United States)

    ,

    2006-01-01

    Introduction: The acquisition, management, communication, and long-term stewardship of natural science data, information, and knowledge are fundamental mission responsibilities of the U.S. Geological Survey (USGS). USGS scientists collect, maintain, and exchange raw scientific data and interpret and analyze it to produce a wide variety of science-based products. Managers throughout the Bureau access, summarize, and analyze administrative or business-related information to budget, plan, evaluate, and report on programs and projects. Information professionals manage the extensive and growing stores of irreplaceable scientific information and knowledge in numerous databases, archives, libraries, and other digital and nondigital holdings. Information is the primary currency of the USGS, and it flows to scientists, managers, partners, and a wide base of customers, including local, State, and Federal agencies, private sector organizations, and individual citizens. Supporting these information flows is an infrastructure of computer systems, telecommunications equipment, software applications, digital and nondigital data stores and archives, technical expertise, and information policies and procedures. This infrastructure has evolved over many years and consists of tools and technologies acquired or built to address the specific requirements of particular projects or programs. Developed independently, the elements of this infrastructure were typically not designed to facilitate the exchange of data and information across programs or disciplines, to allow for sharing of information resources or expertise, or to be combined into a Bureauwide and broader information infrastructure. The challenge to the Bureau is to wisely and effectively use its information resources to create a more Integrated Information Environment that can reduce costs, enhance the discovery and delivery of scientific products, and improve support for science. This Information Technology Strategic Plan

  6. Hanford Integrated Planning Process: 1993 Hanford Site-specific science and technology plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document is the FY 1993 report on Hanford Site-specific science and technology (S&T) needs for cleanup of the Site as developed via the Hanford Integrated Planning Process (HIPP). It identifies cleanup problems that lack demonstrated technology solutions and technologies that require additional development. Recommendations are provided regarding allocation of funding to address Hanford`s highest-priority technology improvement needs, technology development needs, and scientific research needs, all compiled from a Sitewide perspective. In the past, the S&T agenda for Hanford Site cleanup was sometimes driven by scientists and technologists, with minimal input from the ``problem owners`` (i.e., Westinghouse Hanford Company [WHC] staff who are responsible for cleanup activities). At other times, the problem-owners made decisions to proceed with cleanup without adequate scientific and technological inputs. Under both of these scenarios, there was no significant stakeholder involvement in the decision-making process. One of the key objectives of HIPP is to develop an understanding of the integrated S&T requirements to support the cleanup mission, (a) as defined by the needs of the problem owners, the values of the stakeholders, and the technology development expertise that exists at Hanford and elsewhere. This requires a periodic, systematic assessment of these needs and values to appropriately define a comprehensive technology development program and a complementary scientific research program. Basic to our success is a methodology that is defensible from a technical perspective and acceptable to the stakeholders.

  7. Burns Interagency Fire Zone : Fire Danger Operating and Preparedness Plan 2010

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fire Danger Operating and Preparedness Plan for the Burns Interagency Fire Zone. This plan provides a method to calculate the preparedness and dispatch...

  8. Healthcare technology co-operatives: Innovative about innovation.

    Science.gov (United States)

    Heron, Nicola M; Tindale, Wendy B

    2014-01-01

    The paper provides an introduction to the National Institute for Health Research Devices for Dignity Healthcare Technology Co-operative. Embedded within the NHS, Devices for Dignity identifies areas of unmet clinical need and translates these into research and development projects to develop new medical technologies. It addresses the needs of people living with long-term conditions, helping them to live more dignified and independent lives. Through partnerships with patients, universities, the NHS and industry, Devices for Dignity has developed an innovation methodology for successful medical technology innovation.

  9. Working operations of simple technological processes in construction industry ordering (rus

    Directory of Open Access Journals (Sweden)

    Kalyuzhnyuk A.V.

    2011-11-01

    Full Text Available Ordering process has been described by the example of the simple technological processes of reinforced concrete building structures joints welding working operations set.Methods of ordering are adopted from graph theory, expert assessment, network planning and management. The proposed method is designed for application in technical regulation for organizational effectiveness indicators of simple technological processes of construction and special types of work determining.The proposed methods improve the technical normalization quality. They are recommended for application in systems of the construction industry automated preparation.

  10. Technology management: a perspective on system support, procurement, and replacement planning.

    Science.gov (United States)

    Dickerson, M L; Jackson, M E

    1992-01-01

    The escalating costs associated with medical technology present a host of challenges for the hospital clinical engineering department. As service and support costs comprise ever larger portions of a system's life cycle cost, innovative management of service provider mix and mechanisms can provide substantial savings in operating expenses. In addition to full-service contracts, the use of demand service and independents has become commonplace. Medical equipment maintenance insurance programs provide yet another service alternative, combining the flexibility of demand service with the safety of a capped budget. These programs have gained acceptance among hospitals as their providers have become more focused on the healthcare market and its many needs. In view of the long-term cost impact surrounding technology procurement, the authors recommend that hospitals refine system evaluation methodologies and develop more comprehensive techniques directed at capital equipment replacement planning. One replacement planning approach, based on an estimation of system value changes, is described and illustrated using data collected through client consultations. Although the validity of this method has not been demonstrated, it represents a simplified approach to life cycle cost analysis and is intended to provide a standard method by which system replacement planning may be quantified. As a departure from system devaluation based solely on depreciation, this method estimates prospective system values derived from anticipated operations and maintenance costs, projected revenue, and the availability of new technology.

  11. Albuquerque Operations Office, Albuquerque, New Mexico: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Albuquerque Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents that highlight technology development activities within each of the OTD program elements. These integrated program summaries include: Volatile Organic Compounds in Non-Arid Soils, Volatile Organic Compounds in Arid Soils, Mixed Waste Landfill Integrated Demonstration, Uranium in Soils Integrated Demonstration, Characterization, Monitoring, and Sensor Technology, In Situ Remediation, Buried Waste Integrated Demonstration, Underground Storage Tank, Efficient Separations and Processing, Mixed Waste Integrated Program, Rocky Flats Compliance Program, Pollution Prevention Program, Innovation Investment Area, and Robotics Technology.

  12. Achieving cost reductions in EOSDIS operations through technology evolution

    Science.gov (United States)

    Newsome, Penny; Moe, Karen; Harberts, Robert

    1996-01-01

    The earth observing system (EOS) data information system (EOSDIS) mission includes the cost-effective management and distribution of large amounts of data to the earth science community. The effect of the introduction of new information system technologies on the evolution of EOSDIS is considered. One of the steps taken by NASA to enable the introduction of new information system technologies into the EOSDIS is the funding of technology development through prototyping. Recent and ongoing prototyping efforts and their potential impact on the performance and cost-effectiveness of the EOSDIS are discussed. The technology evolution process as it related to the effective operation of EOSDIS is described, and methods are identified for the support of the transfer of relevant technology to EOSDIS components.

  13. Replanning Using Hierarchical Task Network and Operator-Based Planning

    Science.gov (United States)

    Wang, X.; Chien, S.

    1997-01-01

    In order to scale-up to real-world problems, planning systems must be able to replan in order to deal with changes in problem context. In this paper we describe hierarchical task network and operatorbased re-planning techniques which allow adaptation of a previous plan to account for problems associated with executing plans in real-world domains with uncertainty, concurrency, changing objectives.

  14. Metropolis Parking Problems and Management Planning Solutions for Traffic Operation Effectiveness

    Directory of Open Access Journals (Sweden)

    Yuejun Liu

    2012-01-01

    Full Text Available Advances in mobility are clearly illustrated by the rapid development of urbanization and motorization in developing countries. Following the dramatic incensement of traffic demand, the parking problem has been becoming much more seriously important in many metropolises. With the aim of seeking solutions as to how the parking system could operate more efficiently by using new technologies and new methodologies, this paper discusses the application of geographic information system into the parking planning and management for traffic operation effectiveness in metropolis. The concentration of this paper includes the characteristics of parking demand and the causations of parking problems, especially the basic parking principle and strategies for solving parking problems from the perspective of geographic information system are discussed in enough detail in this paper.

  15. Investigating the efficacy of an intelligent operation planning and support tool for acute healthcare contexts.

    Science.gov (United States)

    Wickramasinghe, Nilmini; Kent, Bridie; Moghimi, Fatemeh Hoda; Nguyen, Lemai; Redley, Bernice; Taylor, Nyree; Muhammed, Imran; Botti, Mari

    2013-01-01

    Nurses are the largest group of healthcare professionals in hospitals providing 24-hour care to patients. Hence, nurses are pivotal in coordinating and communicating patient care information in the complex network of healthcare professionals, services and other care processes. Yet, despite nurses' central role in health care delivery, intelligent systems have historically rarely been designed around nurses' operational needs. This could explain the poor integration of technologies into nursing work processes and consequent rejection by nursing professionals. The complex nature of acute care delivery in hospitals and the frequently interrupted patterns of nursing work suggest that nurses require flexible intelligent systems that can support and adapt to their variable workflow patterns. This study is designed to explore nurses' initial reactions to a new intelligent operational planning and support tool (IOPST) for acute healthcare. The following reports on the first stage of a longitudinal project to use an innovative approach involving nurses in the development of the IOPST; from conceptualization to implementation.

  16. Governance of Information And Communication Technology (ICT System Planning

    Directory of Open Access Journals (Sweden)

    Bahrawi Bahrawi

    2017-01-01

    Full Text Available The intensity of ICT usage continues to increase. This should be accompanied  by the increase of the government's performance, and one of the important components is governance of the ICT system planning. The ICT system planning with a good management will provide significant benefits to the organization. One cause of insignificant benefits ICT to the organizational goals is there is no ICT governance applied.  It can be caused by many things, one of them is the lack of knowledge and awareness about the ICT governance, so there are still many government agencies which have not yet implemented properly the ICT governance. By using quantitative approaches, questionnaire instrument was adapted from the General Guide of the National ICT Governance. Framework COBIT and data analysis techniques adopted from the COBIT Maturity level. This study aims to explore the guidelines as an evaluation tool for the governance of the ICT system planning in Department of Communications and Information Technology in Bitung City. The results of this study found that the institution is still at low level, level 1 with 0,63 maturity level in governance planning of ICT system.

  17. Landscape design or parameterization? Recent tendencies in geo-technologies for representing and planning urban territory

    Directory of Open Access Journals (Sweden)

    Ana Clara Mourão Moura

    2013-05-01

    Full Text Available The text discusses the state-of-the-art of GIS Technologies in planning and management processes of urban and architectural spaces. It presents latest’s evolution in GIS methodology and applications, discussing how these resources have changed our way of representing and projecting territory. It discusses contemporaneous values, in interventions into urban spaces. The paper also presents legislation’s role in data registers and infrastructure, favoring wide employment of geoprocessing. It announces the arrival of new territorial representation logics, among which is azimuth visualization, considering mental maps, the employment of BIM (Building Information Modeling and the process of parameterization. It points out tendencies and values, such as being inter- operational, creating interpretative portraits for reality, producing simulated scenarios, investing in visualizing and involvement with communities, and fully employing geo-technologies, as aids for decision making. It defends that we are living a new paradigm on territorial planning: the Parametric Modeling of Territorial Occupation.

  18. National Forestry Research Plan and Strategic Plan of the Agricultural Science and Technology Program (Colciencias

    Directory of Open Access Journals (Sweden)

    Mónica María Baquero Parra

    2011-06-01

    Full Text Available This paper aims to share the national research priorities in agriculture and forestry areas with the scientific community, based on the lines of research identified by the Agricultural Science and Technology Program for the 2010-2019 Strategic Plans by Colciencias. The Strategic Agriculture Plan has determined that the research priorities are Colombia to manage the supply chain, nutrition, rural poverty, quality and innocuousness, as well as the slow production transformation: cost of opportunity and insufficient, decontextualized research. Each of the aforementioned problems is briefly described in the document. As far as the National Plan of Forestry Research is concerned, the following three main topics were suggested: to strengthen a national genetic improvement of tree species that contribute to productivity and the increase of environmental services; to identify and characterize areas, species and potential products for reforestation programs; and to identify species, arrangements and densities that optimize the goods that may be obtained from a forest plantation and its environmental services for the top priority social and agro-ecological conditions of the country. The information regarding the two National Strategic Plans is expected to be disclosed during the first semester of 2011, so that the Administrative Department of Science, Technology and Innovation (Colciencias can support the research projects that meet the expectations of the identified priorities.

  19. Identifying influential factors on integrated marketing planning using information technology

    Directory of Open Access Journals (Sweden)

    Karim Hamdi

    2014-07-01

    Full Text Available This paper presents an empirical investigation to identify important factors influencing integrated marketing planning using information technology. The proposed study designs a questionnaire for measuring integrated marketing planning, which consists of three categories of structural factors, behavioral factors and background factors. There are 40 questions associated with the proposed study in Likert scale. Cronbach alphas have been calculated for structural factors, behavioral factors and background factors as 0.89, 0.86 and 0.83, respectively. Using some statistical test, the study has confirmed the effects of three factors on integrated marketing. In addition, the implementation of Freedman test has revealed that structural factors were the most important factor followed by background factors and behavioral factors.

  20. Gas Hydrate Research Site Selection and Operational Research Plans

    Science.gov (United States)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a

  1. Simulator platform for fast reactor operation and safety technology demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Vilim, R. B.; Park, Y. S.; Grandy, C.; Belch, H.; Dworzanski, P.; Misterka, J. (Nuclear Engineering Division)

    2012-07-30

    A simulator platform for visualization and demonstration of innovative concepts in fast reactor technology is described. The objective is to make more accessible the workings of fast reactor technology innovations and to do so in a human factors environment that uses state-of-the art visualization technologies. In this work the computer codes in use at Argonne National Laboratory (ANL) for the design of fast reactor systems are being integrated to run on this platform. This includes linking reactor systems codes with mechanical structures codes and using advanced graphics to depict the thermo-hydraulic-structure interactions that give rise to an inherently safe response to upsets. It also includes visualization of mechanical systems operation including advanced concepts that make use of robotics for operations, in-service inspection, and maintenance.

  2. Energy Technology Initiatives - Implementation Through Multilateral Co-operation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-15

    New technologies will be critical in addressing current global energy challenges such as energy security. More must be done, however, to push forward the development and deployment of the technologies we need today and will need in the future. Government leaders have repeatedly underlined the crucial role of industry and businesses in advancing energy technologies and the importance of strong collaboration among all stakeholders to accelerate technology advances. To attain these goals, increased co-operation between industries, businesses and government energy technology research is indispensable. The public and private sectors must work together, share burdens and resources, while at the same time multiplying results and outcomes. The 42 multilateral technology initiatives (Implementing Agreements) supported by the IEA are a flexible and effective framework for IEA member and non-member countries, businesses, industries, international organisations and non-government organisations to research breakthrough technologies, to fill existing research gaps, to build pilot plants, to carry out deployment or demonstration programmes -- in short to encourage technology-related activities that support energy security, economic growth and environmental protection. This publication highlights the significant accomplishments of the IEA Implementing Agreements.

  3. 77 FR 31499 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-05-29

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program...

  4. Method for Measuring the Alignment Between Information Technology Strategic Planning and Actions of Information Technology Governance

    Directory of Open Access Journals (Sweden)

    Lúcio Melre da Silva

    2014-10-01

    Full Text Available The purpose of this research is to present a method for measuring the degree of alignment between Strategic Planning and Information Technology Management practices and Information Technology Governance. A survey of IT governance maturity at the High Courts and the Supreme Court was carried out in order to reach this aim. The Attribute Table of the COBIT 4.1 was used both as a model for maturity analysis as for the degree of alignment of IT strategic plans of these bodies with the IT Strategic Planning established by the National Judiciary Council (CNJ. It was assessed the maturity of thirty four processes, according to six attributes, in the four COBIT domains. The proposed method, named COMPLAN-GTI, allows the linking of the guidelines of the strategic planning to the COBIT processes. The field research above mentioned shows that the alignment between the planning established by the CNJ and those established by the High Courts and Supreme Court is around 68%, leading to the conclusion that the policies and actions established by the National Council of Justice for the Judiciary are being followed. The application of the method is also used to confirm whether the management practices and the IT Governance are consistent with the strategic plan established by the organization. It was observed in the research carried out in the Courts that the average convergence between PETIs and management practices and Governance lies around 70%, leading to the conclusion that the strategic plans exerted influence on the action planning of these organizations.

  5. A health plan prescription for health information technology.

    Science.gov (United States)

    Gingrich, Newt; Hasan, Malik

    2010-12-01

    The economic stimulus law of 2009 included incentive payments to encourage providers and hospitals to adopt and "meaningfully use" electronic health records. One resource was excluded from these regulations: patient data from the patient's health insurer, although health insurance companies tie together multiple sectors of the healthcare industry in a single patient-centered data form known as the claims history. They also have considerable experience with information technology (IT). As a result, they are uniquely positioned to move adoption of health IT systems forward. Health plan technologies should be included in the meaningful-use requirements. The result will be additional functionality, which in the end will improve quality, lower costs, and improve individual health.

  6. Planned obsolescence publishing, technology, and the future of the academy

    CERN Document Server

    Fitzpatrick, Kathleen

    2011-01-01

    Academic institutions are facing a crisis in scholarly publishing at multiple levels: presses are stressed as never before, library budgets are squeezed, faculty are having difficulty publishing their work, and promotion and tenure committees are facing a range of new ways of working without a clear sense of how to understand and evaluate them. Planned Obsolescence is both a provocation to think more broadly about the academy’s future and an argument for reconceiving that future in more communally-oriented ways. Facing these issues head-on, Kathleen Fitzpatrick focuses on the technological changes—especially greater utilization of internet publication technologies, including digital archives, social networking tools, and multimedia—necessary to allow academic publishing to thrive into the future. But she goes further, insisting that the key issues that must be addressed are social and institutional in origin. Springing from original research as well as Fitzpatrick’s own hands-on experiments in ne...

  7. Addressing Ontario water management plan requirements through the application of spatial technology

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, S. [4DM Inc., Toronto, ON (Canada); Tonkin, C. [Ontario Power Generation Inc., Toronto, ON (Canada)

    2005-07-01

    This PowerPoint presentation outlined Ontario Power Generation's (OPG) water management plans as they refer to changes to Ontario's electricity market. It included water management planning requirements after the planning process and the OPG's commitment to water management planning in general. The OPG is actively involved in the planning process and advisory committee meetings. It also implemented a decision support software system as an approach for monitoring water management plans in watershed areas in which the OPG operates. A water management review (WMR) was initiated in Ontario in 1995. A review was also undertaken in 2005 and a number of information technology projects that were implemented were discussed. One of the software applications entitled Water View was presented in more detail. The purpose of this software is to address compliance and reporting requirements related to WMR. It represents a starting point for building information along a river system in a spatial context. Last, the presentation identified next steps which include the potential to expand into other OPG watersheds; enhancements to existing functionality; new functionality; and exploring interest with other waterpower producers. 2 figs.

  8. 2012 U. S. Marine Corps S&T Strategic Plan: Leading Edge Technology for the Marines of Tomorrow

    Science.gov (United States)

    2012-01-01

    ROMO ) including attended and unattended space, air, ground and sea sensors down to the individual warfighter. Flagpole to fighting hole, forces...SEA-STO-4: Forecasting adverse sea conditions Develop technologies and decision support tools to forecast wind , waves, and ship motions far...range of military operations ( ROMO ) Goal: The Naval Medicine S &T planning process will identify and prioritize relevant capability gaps

  9. Development and Evaluation of an Intuitive Operations Planning Process

    Science.gov (United States)

    2006-03-01

    flip chart with paper, talc (for creating overlays), pens and pencils, etc. The planning teams used the laptops, whiteboards, flipcharts and talc for...working together to determine structure and composition (ORBAT) of the armored BG 0:06 Putting info on flip chart 1 0:07 Cmdr leaves to go planning 0

  10. Heuristics in Global Combat Logistics Force Operational Planning

    Science.gov (United States)

    2010-03-01

    maximizes deployed battle group on-station-time and endurance. The author presents a heuristic algorithm extension to the legacy CLF planning tool to plan...for completion, and can require 5 minutes to an hour just to find an initial feasible solution. On the contrary, a heuristic algorithm can provide initial feasible solutions in a matter of seconds.

  11. 77 FR 25577 - General Provisions; Operating and Strategic Business Planning

    Science.gov (United States)

    2012-05-01

    ... include a marketing plan that discusses how the institution will further the objective that the FCS be..., in order to fulfill the objectives of this rule, the human capital and marketing plans must include...) 883-4020. SUPPLEMENTARY INFORMATION: I. Objectives The objectives of this amendment are to ensure that...

  12. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  13. 75 FR 47631 - Swets Information Services, Operations Department, Information Technology Group, Marketing Group...

    Science.gov (United States)

    2010-08-06

    ... Technology Group, Marketing Group, Finance Group, Runnemede, NJ; Amended Certification Regarding Eligibility... investigation combined the Operations Department, Information Technology (IT) Group, Marketing Group and the... Information Services, Operations Department, Information Technology Group, Marketing Group, and......

  14. 76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan

    Science.gov (United States)

    2011-09-19

    ... HUMAN SERVICES Food and Drug Administration Prescription Drug User Fee Act IV Information Technology... exchange, review, and management of information supporting the process for the review of human drug... Drug User Fee Act (PDUFA) IV Information Technology Plan'' (June 2008 plan). This updated plan...

  15. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Science.gov (United States)

    2010-07-01

    ...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system operations and maintenance plan. (a) Each air carrier must develop and implement an aircraft water system operations and maintenance plan for each aircraft water system that it...

  16. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... From the Federal Register Online via the Government Publishing Office FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning... Credit System institution to adopt an operational and strategic business plan to include, among...

  17. Advanced Technologies in Safe and Efficient Operating Rooms

    Science.gov (United States)

    2006-02-01

    area of Informatics, a Meta analysis of commercially available positioning technolgies has been completed. A sampling of these technologies was...intense care provided for many patients. The operating room forms the nucleus of mobile military hospitals. Whether found in civilian or military...encompasses systems consisting of mobile transmitters and fixed or semi-fixed receivers used wirelessly and without human intervention to identify the

  18. 22 CFR Appendix I to Part 211 - Operational Plan

    Science.gov (United States)

    2010-04-01

    ...., that are necessary to achieve program impact, including determination of financial costs and sources of...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  19. Using GOMS and Bayesian plan recognition to develop recognition models of operator behavior

    Science.gov (United States)

    Zaientz, Jack D.; DeKoven, Elyon; Piegdon, Nicholas; Wood, Scott D.; Huber, Marcus J.

    2006-05-01

    Trends in combat technology research point to an increasing role for uninhabited vehicles in modern warfare tactics. To support increased span of control over these vehicles human responsibilities need to be transformed from tedious, error-prone and cognition intensive operations into tasks that are more supervisory and manageable, even under intensely stressful conditions. The goal is to move away from only supporting human command of low-level system functions to intention-level human-system dialogue about the operator's tasks and situation. A critical element of this process is developing the means to identify when human operators need automated assistance and to identify what assistance they need. Toward this goal, we are developing an unmanned vehicle operator task recognition system that combines work in human behavior modeling and Bayesian plan recognition. Traditionally, human behavior models have been considered generative, meaning they describe all possible valid behaviors. Basing behavior recognition on models designed for behavior generation can offers advantages in improved model fidelity and reuse. It is not clear, however, how to reconcile the structural differences between behavior recognition and behavior modeling approaches. Our current work demonstrates that by pairing a cognitive psychology derived human behavior modeling approach, GOMS, with a Bayesian plan recognition engine, ASPRN, we can translate a behavior generation model into a recognition model. We will discuss the implications for using human performance models in this manner as well as suggest how this kind of modeling may be used to support the real-time control of multiple, uninhabited battlefield vehicles and other semi-autonomous systems.

  20. Performance of Optimization Heuristics for the Operational Planning of Multi-energy Storage Systems

    Science.gov (United States)

    Haas, J.; Schradi, J.; Nowak, W.

    2016-12-01

    In the transition to low-carbon energy sources, energy storage systems (ESS) will play an increasingly important role. Particularly in the context of solar power challenges (variability, uncertainty), ESS can provide valuable services: energy shifting, ramping, robustness against forecast errors, frequency support, etc. However, these qualities are rarely modelled in the operational planning of power systems because of the involved computational burden, especially when multiple ESS technologies are involved. This work assesses two optimization heuristics for speeding up the optimal operation problem. It compares their accuracy (in terms of costs) and speed against a reference solution. The first heuristic (H1) is based on a merit order. Here, the ESS are sorted from lower to higher operational costs (including cycling costs). For each time step, the cheapest available ESS is used first, followed by the second one and so on, until matching the net load (demand minus available renewable generation). The second heuristic (H2) uses the Fourier transform to detect the main frequencies that compose the net load. A specific ESS is assigned to each frequency range, aiming to smoothen the net load. Finally, the reference solution is obtained with a mixed integer linear program (MILP). H1, H2 and MILP are subject to technical constraints (energy/power balance, ramping rates, on/off states...). Costs due to operation, replacement (cycling) and unserved energy are considered. Four typical days of a system with a high share of solar energy were used in several test cases, varying the resolution from one second to fifteen minutes. H1 and H2 achieve accuracies of about 90% and 95% in average, and speed-up times of two to three and one to two orders of magnitude, respectively. The use of the heuristics looks promising in the context of planning the expansion of power systems, especially when their loss of accuracy is outweighed by solar or wind forecast errors.

  1. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  2. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  3. Use plan from the industrial end users and for technologies developed in the frame of ABLAMOD

    OpenAIRE

    Gülhan, Ali; Pinaud, Gregory; Cretella, Attilio; Johnstone, Emma

    2016-01-01

    ABLAMOD technologies have a relevant technological impact with respect to the innovative thermal protection system for space transportation systems, interplanetary mission vehicles and thermally highly loaded structures like combustion chambers of solid and hybrid propulsion. An industrialization plan has initially identified the technology development steps to reach space qualification followed by an industrial and procurement plan to allow ablator material application in space transportatio...

  4. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007)...

  5. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan...

  6. Enhancing NASA's Procedure Representation Language to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy are key elements in realizing the vision for space exploration. The NASA Exploration Technology Development Program (ETDP) has been...

  7. Improving productivity and reducing operating costs with fuel cell technology

    Energy Technology Data Exchange (ETDEWEB)

    Hoying, T. [Cellex Power Products Inc., Richmond, BC (Canada)

    2004-07-01

    This short corporate white paper addresses the advantages to fleet lift truck operators of converting to fuel cells from conventional electric battery technology. Conventional batteries are heavy for the energy they store. In addition, large operations require special equipment to change batteries, something that occurs at frequent intervals (4-8 hours). Some of the disadvantages of batteries include requirements such as an eye wash safety program, floor drainage for battery acid containment, and ventilation. The paper asserts that the larger the operation, the greater the problem of overall battery management. It cites the higher energy density of fuel cells as their prime advantage; fueling time is shorter than the time needed to change a battery, and times between refueling/changing is one and a half to two time greater for the fuel cell. In addition to the economic benefits of fuel cells, they do not produce harmful emissions.

  8. Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

    Energy Technology Data Exchange (ETDEWEB)

    Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stoll, Brady [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-05-01

    Power systems of the future are likely to require additional flexibility. This has been well studied from an operational perspective, but has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. There are two primary reasons for this. First, the necessary input data, including cost and resource projections, for flexibility options like demand response and storage are significantly uncertain. Second, it is computationally difficult to represent both investment and operational decisions in detail, the latter being necessary to properly value system flexibility, in CEMs for realistically sized systems. In this work, we extend a particular CEM, NREL's Resource Planning Model (RPM), to address the latter issue by better representing variable generation impacts on operations, and then adding two flexible technologies to RPM's suite of investment decisions: interruptible load and utility-scale storage. This work does not develop full suites of input data for these technologies, but is rather methodological and exploratory in nature. We thus exercise these new investment decisions in the context of exploring price points and value streams needed for significant deployment in the Western Interconnection by 2030. Our study of interruptible load finds significant variation by location, year, and overall system conditions. Some locations find no system need for interruptible load even with low costs, while others build the most expensive resources offered. System needs can include planning reserve capacity needs to ensure resource adequacy, but there are also particular cases in which spinning reserve requirements drive deployment. Utility-scale storage is found to require deep cost reductions to achieve wide deployment and is found to be more valuable in some locations with greater renewable deployment. Differences between more solar- and wind-reliant regions are also found: Storage

  9. An Operational Framework for Insecticide Resistance Management Planning.

    Science.gov (United States)

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  10. Ganges Valley Aerosol Experiment: Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kotamarthi, VR

    2010-06-21

    emissions; and dust. The extended AMF deployment will enable measurements under different regimes of the climate and aerosol abundance—in the wet monsoon period with low aerosol loading; in the dry, hot summer with aerosols dispersed throughout the atmospheric column; and in the cool, dry winter with aerosols confined mostly to the boundary later and mid-troposphere. Each regime, in addition, has its own distinct radiative and atmospheric dynamic drivers. The aircraft operational phase will assist in characterizing the aerosols at times when they have been observed to be at the highest concentrations. A number of agencies in India will collaborate with the proposed field study and provide support in terms of planning, aircraft measurements, and surface sites. The high concentration of aerosols in the upper Ganges Valley, together with hypotheses involving several possible mechanisms with direct impacts on the hydrologic cycle of the region, gives us a unique opportunity to generate data sets that will be useful both in understanding the processes at work and in providing answers regarding the effects of aerosols on climate in a region where the perturbation is the highest.

  11. McClellan Air Force Base operable unit B, two-phase extraction system demonstration test, work implementation plan for McClellan AFB, California. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-03

    This document is an integrated demonstration and work plan that presents the technical approach for design, implementation, and testing of two-phase extraction as compared with pump and treat technology in Operable Unit B, investigative cluster IC1 at the McClellan Air Force Base. This work is being coordinated with Clean Sites under a cooperative agreement with EPA's Technology Innovation Office and Superfund Innovative Technology Evaluation Program.

  12. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line.

  13. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  14. Planning and roadmapping technological innovations cases and tools

    CERN Document Server

    Pizarro, Melinda; Talla, Rajasree

    2014-01-01

    Across industries, firms vary broadly on how they operate with respect to their Research & Development (R&D) activities.  This volume presents a holistic approach to evaluating the critical elements of R&D management, including planning, organization, portfolio management, project management, and knowledge transfer—by assessing R&D management from different sectors.  Featuring empirical research and in-depth case studies from industries as diverse as medical imaging, electric vehicles, and cyber security, the authors identify common features of successful R&D management, despite fundamental differences, such as company size, number of employees, industry sector, and the R&D budget.  In particular, they consider the implications for decision making with respect to resource allocation and investments, such as site selection, purchasing, and cross-departmental communication.

  15. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  16. Using Vision System Technologies to Enable Operational Improvements for Low Visibility Approach and Landing Operations

    Science.gov (United States)

    Kramer, Lynda J.; Ellis, Kyle K. E.; Bailey, Randall E.; Williams, Steven P.; Severance, Kurt; Le Vie, Lisa R.; Comstock, James R.

    2014-01-01

    Flight deck-based vision systems, such as Synthetic and Enhanced Vision System (SEVS) technologies, have the potential to provide additional margins of safety for aircrew performance and enable the implementation of operational improvements for low visibility surface, arrival, and departure operations in the terminal environment with equivalent efficiency to visual operations. To achieve this potential, research is required for effective technology development and implementation based upon human factors design and regulatory guidance. This research supports the introduction and use of Synthetic Vision Systems and Enhanced Flight Vision Systems (SVS/EFVS) as advanced cockpit vision technologies in Next Generation Air Transportation System (NextGen) operations. Twelve air transport-rated crews participated in a motion-base simulation experiment to evaluate the use of SVS/EFVS in NextGen low visibility approach and landing operations. Three monochromatic, collimated head-up display (HUD) concepts (conventional HUD, SVS HUD, and EFVS HUD) and two color head-down primary flight display (PFD) concepts (conventional PFD, SVS PFD) were evaluated in a simulated NextGen Chicago O'Hare terminal environment. Additionally, the instrument approach type (no offset, 3 degree offset, 15 degree offset) was experimentally varied to test the efficacy of the HUD concepts for offset approach operations. The data showed that touchdown landing performance were excellent regardless of SEVS concept or type of offset instrument approach being flown. Subjective assessments of mental workload and situation awareness indicated that making offset approaches in low visibility conditions with an EFVS HUD or SVS HUD may be feasible.

  17. Integrated Motion Planning and Autonomous Control Technology for Autonomous ISR Project

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI and MIT propose to design, implement and test a comprehensive Integrated Mission Planning & Autonomous Control Technology (IMPACT) for Autonomous ISR...

  18. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  19. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  20. Smart facility location planning using GIS technology & facility provision standards for pro-active planning of social facilities

    CSIR Research Space (South Africa)

    Green, Cheri

    2016-08-01

    Full Text Available and Industrial Research SOUTH AFRICA 2 © CSIR 2016 www.csir.co.za Structure of presentation • Key informants & objectives • Linking Accessibility planning; Planning Support Systems and the Smart City concept • Approach & provision... of life, with a wise management of natural resources, through participatory governance” Caragllui 2011 Planning Support Systems (PSS) can be defined as geo-information technology...

  1. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  2. TECHNOLOGY OF REPAIRING OPERATIONAL SUITABILITY BITUMEN-RUBEROID CARPET

    Directory of Open Access Journals (Sweden)

    MISHUK K. M.

    2017-01-01

    Full Text Available Raising of problem. In the article is presented the analysis of the existing technologies for the restoration of the operational usability of bitumen-polymeric carpet, which allowed to identify their disadvantages, suggested ways to solve problems and highlighted the results of the studies. Firstly, existing bitumen-ruberoid carpet has a residual hydro insulating capacity that can be effectively used. Secondly, the physical condition of the repaired carpet has different types of defects and damage without the proper removal of which is difficult to ensure the desired outcome. The applying of additional layers in conditions of moistening of the lower layers and other defects contributes to their conservation and accelerated loss of operational integrity.Removal of these impacts can be up to 40-50% of all work, can not provide the required effectiveness outcomes in terms of durability, reliability and cost. Therefore the problem is to find ways to achieve a longer after repairing operation with simultaneous reduction of consumables indicators. Purpose of the study is to develop technological solutions serviceability restoration of roofing using unrolling technologies on the principles to minimize the impact of negative factors and the maximum possible use and strengthen the remaining hydro potential of the insulating coating through the use of special impregnating - saturating compositions. Features such compositions are based on the ability to deeply penetrate the thick bitumen-ruberoid carpet and restore his lost components and provide increased water resistance. Conclusion. The article can be introduced in practice of repair-refurbishable works of soft roofing covering of buildings and constructions.

  3. Principles for Integrating Mars Analog Science, Operations, and Technology Research

    Science.gov (United States)

    Clancey, William J.

    2003-01-01

    During the Apollo program, the scientific community and NASA used terrestrial analog sites for understanding planetary features and for training astronauts to be scientists. Human factors studies (Harrison, Clearwater, & McKay 1991; Stuster 1996) have focused on the effects of isolation in extreme environments. More recently, with the advent of wireless computing, we have prototyped advanced EVA technologies for navigation, scheduling, and science data logging (Clancey 2002b; Clancey et al., in press). Combining these interests in a single expedition enables tremendous synergy and authenticity, as pioneered by Pascal Lee's Haughton-Mars Project (Lee 2001; Clancey 2000a) and the Mars Society s research stations on a crater rim on Devon Island in the High Canadian Arctic (Clancey 2000b; 2001b) and the Morrison Formation of southeast Utah (Clancey 2002a). Based on this experience, the following principles are proposed for conducting an integrated science, operations, and technology research program at analog sites: 1) Authentic work; 2) PI-based projects; 3) Unencumbered baseline studies; 4) Closed simulations; and 5) Observation and documentation. Following these principles, we have been integrating field science, operations research, and technology development at analog sites on Devon Island and in Utah over the past five years. Analytic methods include work practice simulation (Clancey 2002c; Sierhuis et a]., 2000a;b), by which the interaction of human behavior, facilities, geography, tools, and procedures are formalized in computer models. These models are then converted into the runtime EVA system we call mobile agents (Clancey 2002b; Clancey et al., in press). Furthermore, we have found that the Apollo Lunar Surface Journal (Jones, 1999) provides a vast repository or understanding astronaut and CapCom interactions, serving as a baseline for Mars operations and quickly highlighting opportunities for computer automation (Clancey, in press).

  4. Textile Industry Twelfthy-Five-Year-Plan Technology Progress Outline Release

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    Nov. 19th, Beijing. China National Textile & Apparel Council release the Textile Industry Twelfthy-Five-Year-Plan Technology Progress Outline. The outline describes the key tasks of technology progress for

  5. 33 CFR 148.722 - Should the construction plan incorporate best available technology and recommended industry...

    Science.gov (United States)

    2010-07-01

    ... incorporate best available technology and recommended industry practices? 148.722 Section 148.722 Navigation... plan incorporate best available technology and recommended industry practices? Each applicant must... industry practices as directed in § 148.730. ...

  6. Operational freight carrier planning basic concepts, optimization models and advanced memetic algorithms

    CERN Document Server

    Schönberger, Jörn

    2005-01-01

    The modern freight carrier business requires a sophisticated automatic decision support in order to ensure the efficiency and reliability and therefore the survival of transport service providers. This book addresses these challenges and provides generic decision models for the short-term operations planning as well as advanced metaheuristics to obtain efficient operation plans. After a thorough analysis of the operations planning in the freight carrier business, decision models are derived. Their suitability is proven within a large number of numerical experiments, in which a new class of hybrid genetic search approaches demonstrate their appropriateness.

  7. Tracking Trajectory Planning of Space Manipulator for Capturing Operation

    Directory of Open Access Journals (Sweden)

    Panfeng Huang

    2008-11-01

    Full Text Available On-orbit rescuing uncontrolled spinning satellite (USS using space robot is a great challenge for future space service. This paper mainly present a trajectory planning method of space manipulator that can track, approach and catch the USS in free-floating situation. According to the motion characteristics of USS, we plan a spiral ascending trajectory for space manipulator to approach towards USS in Cartesian space. However, it is difficult to map this trajectory into the joint space and realize feasible motion in joint space because of dynamics singularities and dynamics couple of space robot system. Therefore, we utilize interval algorithm to handle these difficulties. The simulation study verifies that the spiral ascending trajectory can been realized. Moreover, the motion of manipulator is smooth and stable, the disturbance to the base is so limited that the attitude control can compensate it.

  8. Automated Planning and Scheduling for Space Mission Operations

    Science.gov (United States)

    Chien, Steve; Jonsson, Ari; Knight, Russell

    2005-01-01

    Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

  9. Operations Research in a New Spanish Air Force Planning System

    Science.gov (United States)

    1991-06-01

    8. Gomez-Coll, Gen. Carlos. " Politica Area a corto y medio plazo," Revista de Aeronautica y Astronautica 569, pages 553-558 (May 1988). 9. Howard...Department of the Air Force. Basic Aerospace Doctrine of the United States Air Force. AFM 1-1. Washington: HQ USAF, March 1984. 5. Editorial. " Politica de...Defensa y Planeamiento Militar," Revista de Aeronautica y Astronautica 565 (January 1988). 6. Ferguson, Lt. Gen. Thomas R. "Requirements Planning

  10. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  11. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  12. Mission Continuity Planning: Strategically Assessing and Planning for Threats to Operations.

    Science.gov (United States)

    Qayoumi, Mohammad H.

    This book covers the principles of risk and risk management and offers a framework for analyzing the significant, often unforeseen threats facing higher education institutions today. It examines the critical elements of a disaster preparedness plan and addresses business continuity and mission continuity planning. The book also provides tools for…

  13. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  14. Planning to avoid trouble in the operating room: experts' formulation of the preoperative plan.

    Science.gov (United States)

    Zilbert, Nathan R; St-Martin, Laurent; Regehr, Glenn; Gallinger, Steven; Moulton, Carol-Anne

    2015-01-01

    The purpose of this study was to capture the preoperative plans of expert hepato-pancreato-biliary (HPB) surgeons with the goal of finding consistent aspects of the preoperative planning process. HPB surgeons were asked to think aloud when reviewing 4 preoperative computed tomography scans of patients with distal pancreatic tumors. The imaging features they identified and the planned actions they proposed were tabulated. Surgeons viewed the tabulated list of imaging features for each case and rated the relevance of each feature for their subsequent preoperative plan. Average rater intraclass correlation coefficients were calculated for each type of data collected (imaging features detected, planned actions reported, and relevance of each feature) to establish whether the surgeons were consistent with one another in their responses. Average rater intraclass correlation coefficient values greater than 0.7 were considered indicative of consistency. Division of General Surgery, University of Toronto. HPB surgeons affiliated with the University of Toronto. A total of 11 HPB surgeons thought aloud when reviewing 4 computed tomography scans. Surgeons were consistent in the imaging features they detected but inconsistent in the planned actions they reported. Of the HPB surgeons, 8 completed the assessment of feature relevance. For 3 of the 4 cases, the surgeons were consistent in rating the relevance of specific imaging features on their preoperative plans. These results suggest that HPB surgeons are consistent in some aspects of the preoperative planning process but not others. The findings further our understanding of the preoperative planning process and will guide future research on the best ways to incorporate the teaching and evaluation of preoperative planning into surgical training. Copyright © 2014 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  15. Planning guide biomass conversion plants consisting of concrete. Planning, dimensioning and operation; Planungshilfe Biogasanlagen aus Beton. Planung, Bemessung, Ausfuehrung

    Energy Technology Data Exchange (ETDEWEB)

    Middel, Matthias (ed.)

    2013-08-01

    In recent years, the construction of biomass conversion plants for the production of clean energy experienced a boom. This boom will still continue for some years. The operation of biomass conversion plants imposes high demands on the construction. Simultaneously, the operators of biomass conversion plants expect a long trouble-free service life of their plants. Biogas plants consisting of concrete meet these requirements, if these are carefully planned and performed. The book under consideration provides the necessary expertise for this.

  16. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  17. Minimally Processed Functional Foods: Technological and Operational Pathways.

    Science.gov (United States)

    Rodgers, Svetlana

    2016-10-01

    This paper offers a concise review of technical and operational concepts underpinning commercialization of minimally processed functional foods (FFs), foods with fresh-like qualities commanding premium prices. The growing number of permitted nutritional content/health claims, many of which relate to well-being, coupled with emerging extraction and food processing technologies offers new exciting opportunities for small and medium size enterprises (SMEs) specializing in fresh produce to play an active role in the health market. Supporting SMEs, governments could benefit from savings in healthcare costs and value creation in the economy. Consumers could benefit from novel FF formats such as refrigerated RTE (ready-to-eat) meals, a variety of fresh-like meat-, fish-, and egg-based products, fresh-cut fruits and vegetables, cereal-based fermented foods and beverages. To preserve these valuable commodities, mild biological (enzymatic treatment, fermentation and, bio-preservation) and engineering solutions are needed. The latter include nonthermal techniques such as high-pressure treatment, cook-chill, sous-vide, mirco-encapsulation, vacuum impregnation and others. "De-constructive" culinary techniques such as 3D food printing and molecular gastronomy as well as developments in nutrigenomics and digital technologies facilitate novel product formats, personalization and access to niche markets. In the operational sense, moving from nourishment to health improvement demands a shift from defensive market-oriented to offensive market-developing strategies including collaborative networks with research organizations.

  18. 25 CFR 20.209 - Can a tribe operating under a tribal redesign plan go back to operating under this part?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT....209 Can a tribe operating under a tribal redesign plan go back to operating under this part? Yes, a...

  19. Technological iatrogenesis: the manifestation of inadequate organizational planning and the integration of health information technology.

    Science.gov (United States)

    Palmieri, Patrick Albert; Peterson, Lori T; Corazzo, Luciano Bedoya

    2011-01-01

    The Institute of Medicine (IOM) views Health Information Technology (HIT) as an essential organizational prerequisite for the delivery of safe, reliable, and cost-effective health services. However, HIT presents the proverbial double-edged sword in generating solutions to improve system performance while facilitating the genesis of novel iatrogenic problems. Incongruent organizational processes give rise to technological iatrogenesis or the unintended consequences to system integrity and the resulting organizational outcomes potentiated by incongruent organizational-technological interfaces. HIT is a disruptive innovation for health services organizations but remains an overlooked organizational development (OD) concern. Recognizing the technology-organizational misalignments that result from HIT adoption is important for leaders seeking to eliminate sources of system instability. The Health Information Technology Iatrogenesis Model (HITIM) provides leaders with a conceptual framework from which to consider HIT as an instrument for organizational development. Complexity and Diffusion of Innovation theories support the framework that suggests each HIT adoption functions as a technological change agent. As such, leaders need to provide operational oversight to managers undertaking system change via HIT implementation. Traditional risk management tools, such as Failure Mode Effect Analysis and Root Cause Analysis, provide proactive pre- and post-implementation appraisals to verify system stability and to enhance system reliability. Reconsidering the use of these tools within the context of a new framework offers leaders guidance when adopting HIT to achieve performance improvement and better outcomes.

  20. Plans for a German Grid Operations and Support Centre

    Science.gov (United States)

    Reißer, Sabin

    The German grid initiative D-Grid brings together various scientific and commercial projects in fields like medicine, engineering, banking, meteorology using the same grid infrastructure. In this infrastructure, which comprises more than 30 computing centres, three middleware stacks (gLite, Globus and Unicore) are deployed and used by the various communities. This variety of applications as well as of middleware calls for well organised operations and support. The German Grid Operations and Support Centre (GOSC) aim to answer this challenge and also provides an uplink to international activities like EGI. The GOSC will provide middleware services like reference installations for the various middleware flavours. It will manage the national grid operations (regional monitoring, SLA enforcement) and will be responsible for providing VO and user services, like application support and a helpdesk.

  1. Decisional pathways in breast augmentation: how to improve outcomes through accurate pre-operative planning.

    Science.gov (United States)

    Nava, Maurizio B; Rocco, Nicola; Tunesi, Gianfranco; Catanuto, Giuseppe; Rancati, Alberto; Dorr, Julio

    2017-04-01

    Breast augmentation is the most commonly performed surgical procedure in aesthetic plastic surgery. Accurate pre-operative planning is crucial to obtain the best outcomes. We present our planning method deriving from a more than 30-year experience in aesthetic breast surgery, matching together patients tissues' characteristics and patients' wishes. We schematized our planning method in an easy-to-use flow diagram to help the decisional process in breast augmentation.

  2. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  3. A Hybrid Analytical/Simulation Modeling Approach for Planning and Optimizing Mass Tactical Airborne Operations

    Science.gov (United States)

    1995-05-01

    A HYBRID ANALYTICAL/ SIMULATION MODELING APPROACH FOR PLANNING AND OPTIMIZING MASS TACTICAL AIRBORNE OPERATIONS by DAVID DOUGLAS BRIGGS M.S.B.A...COVERED MAY 1995 TECHNICAL REPORT THESIS 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS A HYBRID ANALYTICAL SIMULATION MODELING APPROACH FOR PLANNING AND...are present. Thus, simulation modeling presents itself as an excellent alternate tool for planning because it allows for the modeling of highly complex

  4. Operable Unit C Remedial Investigation Sampling and Analysis Plan

    Science.gov (United States)

    1994-05-02

    RI will be brought to the attention of the Well Abandonmetnt Team so they can be properly decommissioned . 1.3 Updates to the OU C RI SAP As the current...OUcsA•2I•r2944a 5.1-7 TABLE 5.1-2. (Continued) DATA QUALITY OBJECTIVES FOR PFR 65 Problen Statenent If hazardous materials were disposed at PRL 65, the...Summary: Decommissioning plans for BW-6, BW-16, and boring DEB-C1 (possible conduits for contaminant migration) should be provided. Response: Text has been

  5. Procurement planning in oil refining industries considering blending operations

    DEFF Research Database (Denmark)

    Oddsdottir, Thordis Anna; Grunow, Martin; Akkerman, Renzo

    2013-01-01

    This paper addresses procurement planning in oil refining, which has until now only had limited attention in the literature. We introduce a mixed integer nonlinear programming (MINLP) model and develop a novel two-stage solution approach, which aims at computational efficiency while addressing...... the problems due to discrepancies between a non-linear and a linearized formulation. The proposed model covers realistic settings by allowing the blending of crude oil in storage tanks, by modeling storage tanks and relevant processing units individually, and by handling more crude oil types and quality...

  6. General Urban Warfare Amphibious Logistics Applications. Volume 2. Operations Plan.

    Science.gov (United States)

    1983-06-23

    Appendix 7 (Engineer Support Plan). Estimated Priority Bridae Task Size Unit Assigned 1 1, 3, 5 Co.(-) 7th Engr Spt Bn 2 6, 7, 8, 10 Pit.(+) 7th Engr Spt... BrIda OtnarAl U. S149Ay Cr ogS~y~po~m B~n. I ~litrhotlnl OC-400n0la 14 i l IA cvV (DAREEP IV03R2 I F IUIVTGNEA W UNCLASIFIE IgdirGo ,1 VA .CM Marf tf

  7. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  8. Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

  9. Predicting Correct Body Posture based on Theory of Planned Behavior in Iranian Operating Room Nurses

    National Research Council Canada - National Science Library

    BAHAREH ABEDI; RABIOLLAH FARMANBAR1; SAEED OMIDI; MAHDI JAHANGIR BLOURCHIAN

    2015-01-01

    Due to the importance of correct posture for preventing musculoskeletal disorders, the purpose of this study was to evaluate Theory of Planned Behavior in Predicting correct Body Posture in operating room...

  10. Robust, Multi-layered Plan Execution and Revision for Operation of a Network of Communication Antennas

    Science.gov (United States)

    Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.

    1996-01-01

    This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.

  11. DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?

    Directory of Open Access Journals (Sweden)

    V.K Turner

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: During the past five years, MRP based systems have increasingly been criticized for their inability to reduce inventory levels, meet due dates and to plan at an operational level. This paper suggests that the actual reasons for these problems are some fundamental flaws in the MRP logic and its assumptions. The logic of the optimized Production Technology (OPT is suggested as an alternative approach that addresses the limitations of MRP based systems.

    AFRIKAANSE OPSOMMING: Gedurende die afgelope vyf jaar het kritiek teen MRP-gebaseerde sisteme toegeneem. Die kritiek is hoofsaaklik dat MRP-sisteme vooraadvlakke nie voldoende verminder nie; beplande datums nie haal nie en ook nie op In operasionele vlak beplan nie. Hierdie artikel wil voorstel dat die rede hiervoor fundamentele foute in die MRP logika en aannames is. Die logika van "optimized Production Technology" (OPT word as alternatief voorgestel, aangesien dit die probleemareas in die MRP-logika aanspreek.

  12. Hybrid modelling for ATES planning and operation in the Utrecht city centre

    Science.gov (United States)

    Jaxa-Rozen, Marc; Bloemendal, Martin; Kwakkel, Jan; Rostampour, Vahab

    2016-04-01

    Aquifer Thermal Energy Storage (ATES) systems can significantly reduce the energy use and greenhouse gas emissions of buildings in temperate climates. However, the rapid adoption of these systems has evidenced a number of emergent issues with the operation and management of urban ATES systems, which require careful spatial planning to avoid thermal interferences or conflicts with other subsurface functions. These issues have become particularly relevant in the Netherlands, which are currently the leading market for ATES (Bloemendal et al., 2015). In some urban areas of the country, the adoption of ATES technology is thus becoming limited by the available subsurface space. This scarcity is partly caused by current approaches to ATES planning; as such, static permits tend to overestimate pumping rates and yield excessive safety margins, which in turn hamper the energy savings which could be realized by new systems. These aspects are strongly influenced by time-dependent dynamics for the adoption of ATES systems by building owners and operators, and by the variation of ATES well flows under uncertain conditions for building energy demand. In order to take these dynamics into account, previous research (Jaxa-Rozen et al., 2015) introduced a hybrid simulation architecture combining an agent-based model of ATES adoption, a Matlab control design, and a MODFLOW/SEAWAT aquifer model. This architecture was first used to study an idealized case of urban ATES development. This case evidenced a trade-off between the thermal efficiency of individual systems and the collective energy savings realized by ATES systems within a given area, which had already been suggested by other research (e.g. Sommer et al., 2015). These results also indicated that current layout guidelines may be overly conservative, and limit the adoption of new systems. The present study extends this approach to a case study of ATES planning in the city centre of Utrecht, in the Netherlands. This case is

  13. 78 FR 8587 - Thomson Reuters, Finance Operations & Technology Division, Including On-Site Leased Workers From...

    Science.gov (United States)

    2013-02-06

    ... Employment and Training Administration Thomson Reuters, Finance Operations & Technology Division, Including... Worker Adjustment Assistance on August 2, 2012, applicable to workers of Thomson Reuters, Finance... that workers of Thomson Reuters, Finance Operations & Technology Division, including on-site...

  14. Decision Support Using Simulation for Customer-Driven Manufacturing System Design and Operations Planning

    OpenAIRE

    Heilala, Juhani; Montonen, Jari; Jarvinen, Paula; Kivikunnas, Sauli

    2010-01-01

    The chapter is a summary of following national public research projects: "Integrated dynamic simulation model of enterprise for planning of operations", (1997-1999); "Integrated dynamic customer driven production network management using operative simulation" (2000-2001) and "Integrated dynamic electronic production and suppliers control and planning of resources" (2000-2001). Development work was later carried out in the projects "Modelling and simulation of manufacturing systems for value n...

  15. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 780.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  16. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 784.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  17. SIMULATION OF CARS ACCUMULATION PROCESSES FOR SOLVING TASKS OF OPERATIONAL PLANNING IN CONDITIONS OF INITIAL INFORMATION UNCERTAINTY

    Directory of Open Access Journals (Sweden)

    О. A. Tereshchenko

    2017-06-01

    Full Text Available Purpose. The article highlights development of the methodological basis for simulation the processes of cars accumulation in solving operational planning problems under conditions of initial information uncertainty for assessing the sustainability of the adopted planning scenario and calculating the associated technological risks. Methodology. The solution of the problem under investigation is based on the use of general scientific approaches, the apparatus of probability theory and the theory of fuzzy sets. To achieve this purpose, the factors influencing the entropy of operational plans are systematized. It is established that when planning the operational work of railway stations, sections and nodes, the most significant factors that cause uncertainty in the initial information are: a external conditions with respect to the railway ground in question, expressed by the uncertainty of the timing of cars arrivals; b external, hard-to-identify goals for the functioning of other participants in the logistics chain (primarily customers, expressed by the uncertainty of the completion time with the freight cars. These factors are suggested to be taken into account in automated planning through statistical analysis – the establishment and study of the remaining time (prediction errors. As a result, analytical dependencies are proposed for rational representation of the probability density functions of the time residual distribution in the form of point, piecewise-defined and continuous analytic models. The developed models of cars accumulation, the application of which depends on the identified states of the predicted incoming car flow to the accumulation system, are presented below. In addition, the last proposed model is a general case of models of accumulation processes with an arbitrary level of reliability of the initial information for any structure of the incoming flow of cars. In conclusion, a technique for estimating the results of

  18. Information Infrastructure Development Recommendations through Analysis of Current Information Technology Infrastructure, Plans and Policies

    Science.gov (United States)

    2007-11-02

    information society , and the military influence on information and communication technologies development; a review of the policy, objectives, concepts and methods, and the resources outlined in the Information Technology Management Strategic Plan, the Defense Information Infrastructure Master Plan, and the Global and National Information Infrastructure

  19. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS FOR... the Medicaid Program § 495.338 Health information technology implementation advance planning...

  20. Trends in Technology Planning and Funding in Florida K-12 Public Schools

    Science.gov (United States)

    Ritzhaupt, Albert Dieter; Hohlfeld, Tina N; Barron, Ann E.; Kemker, Kate

    2008-01-01

    This empirical research investigates trends in technology planning and funding in Florida's K-12 public schools between the 2003-04 and 2005-06 academic years. Survey items that focused on funding and planning issues on Florida's statewide school technology integration survey were analyzed using logistic models. Results indicate a significant…

  1. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  2. Planning for the V&V of infused software technologies for the Mars Science Laboratory Mission

    Science.gov (United States)

    Feather, Martin S.; Fesq, Lorraine M.; Ingham, Michel D.; Klein, Suzanne L.; Nelson, Stacy D.

    2004-01-01

    NASA's Mars Science Laboratory (MSL) rover mission is planning to make use of advanced software technologies in order to support fulfillment of its ambitious science objectives. The mission plans to adopt the Mission Data System (MDS) as the mission software architecture, and plans to make significant use of on-board autonomous capabilities for the rover software.

  3. TECHNOLOGIES TO ENHANCE THE OPERATION OF EXISTNG NATURAL GAS COMPRESSION INFRASTRUCTURE

    Energy Technology Data Exchange (ETDEWEB)

    Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

    2005-01-28

    This quarterly report documents work performed under Tasks 15, 16, and 18 through 23 of the project entitled: ''Technologies to Enhance the Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report first documents a survey test performed on an HBA-6 engine/compressor installed at Duke Energy's Bedford Compressor Station. This is one of several tests planned, which will emphasize identification and reduction of compressor losses. Additionally, this report presents a methodology for distinguishing losses in compressor attributable to valves, irreversibility in the compression process, and the attached piping (installation losses); it illustrates the methodology with data from the survey test. The report further presents the validation of the simulation model for the Air Balance tasks and outline of conceptual manifold designs.

  4. Ergonomic design in the operating room: information technologies

    Science.gov (United States)

    Morita, Mark M.; Ratib, Osman

    2005-04-01

    The ergonomic design in the Surgical OR of information technology systems has been and continues to be a large problem. Numerous disparate information systems with unique hardware and display configurations create an environment similar to the chaotic environments of air traffic control. Patient information systems tend to show all available statistics making it difficult to isolate the key, relevant vitals for the patient. Interactions in this sterile environment are still being done with the traditional keyboard and mouse designed for cubicle office workflows. This presentation will address the shortcomings of the current design paradigm in the Surgical OR that relate to Information Technology systems. It will offer a perspective that addresses the ergonomic deficiencies and predicts how future technological innovations will integrate into this vision. Part of this vision includes a Surgical OR PACS prototype, developed by GE Healthcare Technologies, that addresses ergonomic challenges of PACS in the OR that include lack of portability, sterile field integrity, and UI targeted for diagnostic radiologists. GWindows (gesture control) developed by Microsoft Research and Voice command will allow for the surgeons to navigate and review diagnostic imagery without using the conventional keyboard and mouse that disrupt the integrity of the sterile field. This prototype also demonstrates how a wireless, battery powered, self contained mobile PACS workstation can be optimally positioned for a surgeon to reference images during an intervention as opposed to the current pre-operative review. Lessons learned from the creation of the Surgical OR PACS Prototype have demonstrated that PACS alone is not the end all solution in the OR. Integration of other disparate information systems and presentation of this information in simple, easy to navigate information packets will enable smoother interactions for the surgeons and other healthcare professionals in the OR. More intuitive

  5. Advanced Education and Technology Business Plan, 2007-10

    Science.gov (United States)

    Alberta Enterprise and Advanced Education, 2007

    2007-01-01

    The Government of Alberta Strategic Business Plan addresses significant opportunities and challenges facing Alberta over the next three years and positions Alberta to make the most of its economic, social and natural advantages. It is a plan to strategically manage growth and plan for a sustainable and secure future. Advanced Education and…

  6. Joint Test Plan for Gas Dynamic Spray Technology Demonstration

    Science.gov (United States)

    Lewis, Pattie

    2008-01-01

    undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The GDS unit selected for demonstration has a powder feeding system that can be used for surface preparation or coating application. The surface preparation feature will also be examined. The primary objective of this effort is to demonstrate GDS technology as a repair method for TSCs. The project will also determine the optimal GDS coating thickness for acceptable performance. Successful completion of this project will result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations and will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  7. WP3 Prototype development for operational planning tool

    DEFF Research Database (Denmark)

    Kristoffersen, Trine; Meibom, Peter; Apfelbeck, J.

    of electricity load and wind power production, and to cover forced outages of power plants and transmission lines. Work has been carried out to include load uncertainty and forced outages in the two main components of the Wilmar Planning tool namely the Scenario Tree Tool and the Joint Market Model. This work...... is documented in chapter 1 and 2. The inclusion of load uncertainty and forced outages in the Scenario Tree Tool enables calculation of the demand for reserve power depending on the forecast horizon. The algorithm is given in Section 3.1. The design of a modified version of the Joint Market Model enabling....... Further, the methodology to identify extreme events on the basis of the existing tools is described. Within the SUPWIND consortium there has been an interest in using the Joint Market Model to model smaller parts of a power system but with more detailed representation of the transmission and distribution...

  8. Operations of and Future Plans for the Pierre Auger Observatory

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, : J.; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E.J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muniz, J.; Ambrosio, M.; Anchordoqui, L.

    2009-06-01

    These are presentations to be presented at the 31st International Cosmic Ray Conference, in Lodz, Poland during July 2009. It consists of the following presentations: (1) Performance and operation of the Surface Detectors of the Pierre Auger Observatory; (2) Extension of the Pierre Auger Observatory using high-elevation fluorescence telescopes (HEAT); (3) AMIGA - Auger Muons and Infill for the Ground Array of the Pierre Auger Observatory; (4) Radio detection of Cosmic Rays at the southern Auger Observatory; (5) Hardware Developments for the AMIGA enhancement at the Pierre Auger Observatory; (6) A simulation of the fluorescence detectors of the Pierre Auger Observatory using GEANT 4; (7) Education and Public Outreach at the Pierre Auger Observatory; (8) BATATA: A device to characterize the punch-through observed in underground muon detectors and to operate as a prototype for AMIGA; and (9) Progress with the Northern Part of the Pierre Auger Observatory.

  9. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  10. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  11. 4TH Marine Division Operation Plan Number 49-44

    Science.gov (United States)

    1944-12-26

    The SFCP irill then designate the letter to be keyed by beacon during tuning. (c) If other means of Corn fail, spots may be transmitted by manually ...provisions of Staff Officer’s Field Manual for Amphibious Operations. 2. The Division Shore Party will be comprised of units or elements thereof as...Annex "Ain to Division administrativo Order Nio, 43-44, (Reviej)) . (4) Repai~, section to provide 2d, 3d and 4th echelon mainteniaince for Engineer

  12. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  13. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    Science.gov (United States)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  14. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  15. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  16. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  17. CARES: Carbonaceous Aerosol and Radiative Effects Study Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zaveri, RA; Shaw, WJ; Cziczo, DJ

    2010-07-12

    The CARES field campaign is motivated by the scientific issues described in the CARES Science Plan. The primary objectives of this field campaign are to investigate the evolution and aging of carbonaceous aerosols and their climate-affecting properties in the urban plume of Sacramento, California, a mid-size, mid-latitude city that is located upwind of a biogenic volatile organic compound (VOC) emission region. Our basic observational strategy is to make comprehensive gas, aerosol, and meteorological measurements upwind, within, and downwind of the urban area with the DOE G-1 aircraft and at strategically located ground sites so as to study the evolution of urban aerosols as they age and mix with biogenic SOA precursors. The NASA B-200 aircraft, equipped with the High Spectral Resolution Lidar (HSRL), digital camera, and the Research Scanning Polarimeter (RSP), will be flown in coordination with the G-1 to characterize the vertical and horizontal distribution of aerosols and aerosol optical properties, and to provide the vertical context for the G-1 and ground in situ measurements.

  18. Discharge planning and home care of the technology-dependent infant.

    Science.gov (United States)

    Bakewell-Sachs, S; Porth, S

    1995-01-01

    Technology-dependent infants are a medically complex, diverse group of individuals, many of whom can be cared for at home. Hospital discharge of any technology-dependent infant requires a multidisciplinary, comprehensive program of discharge planning and follow-up into the home. This article presents an overview of the technology-dependent infant population and a discussion of many of the pertinent issues for consideration during the discharge planning period and the transition from hospital to home.

  19. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  20. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  1. Using Critical Problem Solving to Plan Inter-Organisational Co-operation in e-Customs

    NARCIS (Netherlands)

    Ponisio, M.L.; Eck, van P.A.T.; Riemens, L.

    2008-01-01

    The purpose of this paper is to present a systematic approach to plan assessment of electronic co-operation between customs organisations of different countries (e-Customs). Thorough assessment is of paramount importance, as co-operation in electronic networks usually requires considerable up-front

  2. The space shuttle payload planning working groups. Volume 10: Space technology

    Science.gov (United States)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  3. Development of NPP Monitoring and Operation Support Technology

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Park, Jae Chang; Lee, Yong Hee [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)] (and others)

    2008-04-15

    During the first stage (2001.7.1-2004.6.30), we developed general human factors design guidelines VDU-based workstations, PMAS alarm display design guidelines, PMAS SPADES display design guidelines, and the revision of KHNP HFE guidelines (HF-010), which have been applied to domestic NPP designs. We also supported other KNICS projects by performing RPS COM design reviews, development of RPS COM Style Guide, and a review of CEDMCS cabinet operator module display design. We developed the ADIOS prototype, NPP performance analysis systems for YGN No.1, 2 plants and Kori No. 2 plant, alarm cause tracking systems for Kori No. 2 plant and OPR1000, and signal fault detection and diagnosis methods for deaerators and steam generators. During the second stage(2004.7.1-2008.4.30), we supported other KNICS projects by reviewing RPS COM display designs three times, developing ESF-CCS COM style guides and reviewing ESF-CCS COM display design, reviewing CRCS LOM and PCS MTP display designs, and developing requirements for DCS GUI components. We also developed integrated style guide for I and C cabinet operator module display designs. In cooperative research with KOPEC-AE, we developed basic technologies for advanced HSI design including task analysis methods, an information and control requirements database, display design criteria, a HSI prototype with its evaluation, and methods for human factors engineering verification and validation.

  4. Collaborative task planning for an internet based multi-operator multi-robot system

    Institute of Scientific and Technical Information of China (English)

    GAO Sheng; ZHAO Jie; CAI He-gao

    2005-01-01

    In an Internet based multi-operator and multi-robot system (IMOMR), operators have to work collaboratively to overcome the constraints of space and time. Inherently, the activities among them can be defined as a computer-supported cooperative work (CSCW). As a practical application of CSCW, a collaborative task planning system (CTPS) for IMOMR is proposed in this paper on the basis of Petri nets. Its definition, components design, and concrete implementation are given in detail, respectively. As a result, a clear collaboration mechanism of multiple operators in an IMOMR is obtained to guarantee their task planning.

  5. Innovative pollution prevention program at Air Force owned Raytheon operated facility incorporating Russian technology

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, J.H.; Cepeda-Calderon, S.

    1999-07-01

    Air Force Plant 44 in Tucson, Arizona is owned by the Air Force and operated by Raytheon Missile Systems Company. A joint Air Force/Raytheon Pollution Prevention Team operates at AFP 44 with the ultimate goal to minimize or eliminate the use of hazardous substances. The team works together to uncover new technologies and methods that will replace chemicals used in the plant's missile manufacturing facilities. The program maximizes pollution prevention by first eliminating hazardous material use, then chemical recycling, next hazardous waste reduction and finally wastewater treatment and recycling. From fiscal years 1994 through 1997, nine pollution prevention projects have been implemented, totaling $2.6 million, with a payback averaging less than two years. A unique wastewater treatment method has been demonstrated as part of this program. This is electroflotation, a Russian technology which removes dispersed particles from liquid with gas bubbles obtained during water electrolysis. A unit was built in the US which successfully removed organic emulsions from wastewater. Operational units are planned for the removal of waste from waterfall paint booths. The pollution prevention joint team continues to be very active with two projects underway in FY 98 and two more funded for FY 99.

  6. Operational flash flood forecasting platform based on grid technology

    Science.gov (United States)

    Thierion, V.; Ayral, P.-A.; Angelini, V.; Sauvagnargues-Lesage, S.; Nativi, S.; Payrastre, O.

    2009-04-01

    effort in term of grid technology development. This paper presents an operational flash flood forecasting platform which have been developed in the framework of CYCLOPS European project providing one of virtual organizations of EGEE project. This platform has been designed to enable multi-simulations processes to ease forecasting operations of several supervised watersheds on Grand Delta (SPC-GD) territory. Grid technology infrastructure, in providing multiple remote computing elements enables the processing of multiple rainfall scenarios, derived to the original meteorological forecasting transmitted by Meteo-France, and their respective hydrological simulations. First results show that from one forecasting scenario, this new presented approach can permit simulations of more than 200 different scenarios to support forecasters in their aforesaid mission and appears as an efficient hydrological decision-making tool. Although, this system seems operational, model validity has to be confirmed. So, further researches are necessary to improve models core to be more efficient in term of hydrological aspects. Finally, this platform could be an efficient tool for developing others modelling aspects as calibration or data assimilation in real time processing.

  7. ’Winning the War’: Planning for Integrated, Synchronized, and Simultaneous Operations

    Science.gov (United States)

    2004-01-01

    environment that would permit the reestablishment of the legitimate government of President Aristide, . . . “neutralize the Haitian Army ( FAdH ) and to...know’ requirement. 47 Ibid., 16. 19 airport. The plan envisioned airborne, amphibious, and air assaults to neutralize the FAdH and police, secure...special operations task force (JSOTF) capturing the FAdH headquarters in Port Au Prince.48 After the initial operations, the Joint Special Operations

  8. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; O' Malley, M.

    2012-09-01

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  9. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; O' Malley, M.

    2012-09-01

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  10. Implementing Innovative Technologies through Lesson Plans: What Kind of Support Do Teachers Prefer?

    Science.gov (United States)

    Janssen, Noortje; Lazonder, Ard W.

    2015-01-01

    Lesson plans are a potentially powerful means to facilitate teachers' use of technology in the classroom. This study investigated which supplementary information is preferred by teachers when integrating a new technology into the classroom. Forty-six high school biology teachers (23 pre-service and 23 in-service) received a technology-infused…

  11. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    Grabaskas, David [Argonne National Lab. (ANL), Argonne, IL (United States); Bucknor, Matthew [Argonne National Lab. (ANL), Argonne, IL (United States); Jerden, James [Argonne National Lab. (ANL), Argonne, IL (United States); Brunett, Acacia J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  12. Stereoelectroencephalography based on the Leksell stereotactic frame and Neurotech operation planning software.

    Science.gov (United States)

    Zhang, Guangming; Chen, Guoqiang; Meng, Dawei; Liu, Yanwu; Chen, Jianwei; Shu, Lanmei; Liu, Wenbo

    2017-06-01

    This study aimed to introduce a new stereoelectroencephalography (SEEG) system based on Leksell stereotactic frame (L-SEEG) as well as Neurotech operation planning software, and to investigate its safety, applicability, and reliability.L-SEEG, without the help of navigation, includes SEEG operation planning software (Neurotech), Leksell stereotactic frame, and corresponding surgical instruments. Neurotech operation planning software can be used to display three-dimensional images of the cortex and cortical vessels and to plan the intracranial electrode implantation. In 44 refractory epilepsy patients, 364 intracranial electrodes were implanted through the L-SEEG system, and the postoperative complications such as bleeding, cerebral spinal fluid (CSF) leakage, infection, and electrode-related problems were also investigated.All electrodes were implanted accurately as preoperatively planned shown by postoperative lamina computed tomography and preoperative lamina magnetic resonance imaging. There was no severe complication after intracranial electrode implantation through the L-SEEG system. There were no electrode-related problems, no CSF leakage and no infection after surgery. All the patients recovered favorably after SEEG electrode implantation, and only 1 patient had asymptomatic frontal lateral ventricle hematoma (3 mL).The L-SEEG system with Neurotech operation planning software can be used for safe, accurate, and reliable intracranial electrode implantation for SEEG.

  13. An evolutionary method for synthesizing technological planning and architectural advance

    Science.gov (United States)

    Cole, Bjorn Forstrom

    find the optimum architecture under multiple conditions, which is required for the ability to play the "what if" games typically undertaken in strategic situations. The chapter walks through a graph-based representation of architecture, provides the rationale for choosing a given technology forecasting technique, and lays out the implementation of the optimization algorithm, named Sindri, within a commercial analysis code, Pacelab. The fifth chapter of the thesis then tests the Sindri code. The first test applied is a series of standardized combinatorial spaces, which are meant to be analogous to test problems traditionally posed to optimizers (e.g., Rosenbrock's valley function). The results from this test assess the value of various operators used to transform the architecture graph in the course of conducting a genetic search. Finally, this method is employed on a test case involving the transition of a miniature helicopter from glow engine to battery propulsion, and finally to a design where the battery functions as both structure and power source. The final two chapters develop conclusions based on the body of work conducted within this thesis and issue some prescriptions for future work. The future work primarily concerns improving the continuous optimization processes undertaken within Sindri and in further refining the graph-based structure for physical architectures.

  14. Trends in Technology Planning and Funding in Florida K-12 Public Schools

    Directory of Open Access Journals (Sweden)

    ALBERT DIETER RITZHAUPT

    2008-12-01

    Full Text Available This empirical research investigates trends in technology planning and funding in Florida’s K–12 public schools between the 2003–04 and 2005–06 academic years. Survey items that focused on funding and planning issues on Florida’s statewide school technology integration survey were analyzed using logistic models. Results indicate a significant increase in the number of schools revising their technology plans on a regular basis; a significant increase in the frequency with which Florida’s K–12 public schools are seeking funding for technology-related initiatives; a significant increase in parent, administrator, teacher, and student involvement in the technology planning process; and a significant decline in adequate funding for software and hardware needs. In addition, schools with low proportions of economically disadvantaged students sought and were awarded significantly more funds from donations and federal and state grants. Implications for educational leadership and policy are provided.

  15. Agent Technology supports Inter-Organizational Planning in the Port

    NARCIS (Netherlands)

    J.M. Moonen (Hans); B. van de Rakt (Bastiaan); I. Miller; J.A.E.E. van Nunen (Jo); J. van Hillegersberg (Jos)

    2005-01-01

    textabstractThe Port of Rotterdam is a key container transshipment hub for Europe. Inland container shipping is important to connect the hinterland (40% market share). Barges visit several terminals per round-trip through the Port, thus requiring a proper planning support – to avoid planning

  16. Agent Technology supports Inter-Organizational Planning in the Port

    NARCIS (Netherlands)

    J.M. Moonen (Hans); B. van de Rakt (Bastiaan); I. Miller; J.A.E.E. van Nunen (Jo); J. van Hillegersberg (Jos)

    2005-01-01

    textabstractThe Port of Rotterdam is a key container transshipment hub for Europe. Inland container shipping is important to connect the hinterland (40% market share). Barges visit several terminals per round-trip through the Port, thus requiring a proper planning support – to avoid planning problem

  17. Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”

    Science.gov (United States)

    Molyneux, Sassy; Goodman, Catherine

    2015-01-01

    Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862

  18. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    Science.gov (United States)

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  19. Joint Non-Lethal Weapons Program Science and Technology Strategic Plan

    Science.gov (United States)

    2016-03-31

    3 United Nations, World Urbanization Prospects: The 2014 Revision, 13  4 David Shunk, “ Mega   Cities , Ungoverned Areas, and the Challenge of Army...Urban Combat Operations in 2030‐ 2040,” Small Wars Journal, 23 Jan 2014, http://smallwarsjournal.com/jrnl/art/ mega ‐ cities ‐ungoverned‐areas‐and‐ the...Joint Non‐Lethal Weapons Program Science and Technology Strategic  Plan        I  On the Cover  Carbon Nanotubes  Promising ultra‐light weight and

  20. FY96 materials and processes technology area plan (TAP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Materials and Processes Technology Area Plan (MP TAP) describes the research and development activities performed by the Wright-Laboratory`s Materials Directorate (WL/XL) at WPAFB, OH. WL/ML is responsible for developing MP technologies for all Air Force aircraft, spacecraft, and missiles systems. MP for Structures, Propulsion, and Subsystems thrust of the MP TAP describes the development of technologies utilizing advanced composite materials, lightweight - aluminum and titanium alloys, high temperature intermetallics, and improved fluids, lubricants, and coatings. Applications include airframe and engine retrofits, high speed aircraft, spacelift, missiles and satellites. The MP for Electronics, Optics, and Survivability thrust of the MP TAP describes the development of materials for high temperature semiconductors and superconductors, advanced infrared detectors, non-linear optical devices, and laser hardening. Applications include high power radar and avionic systems, infrared countermeasures, and sensor and aircrew laser protection. The MP for Systems and Operational Support thrust of the MP TAP describes the development of nondestructive inspection (NDI) techniques and repair of composite and LO materials. It also describes ML`s interface with all Air Force fielded systems through logistic centers and system project offices (SPOs) and by conducting electronic and structural failure analysis.

  1. Predicting changes in blood flow in patient-specific operative plans for treating aortoiliac occlusive disease.

    Science.gov (United States)

    Wilson, Nathan M; Arko, Frank R; Taylor, Charles A

    2005-07-01

    Traditionally, a surgeon will select a procedure for a particular patient on the basis of past experience with patients with a similar state of disease. The experience gained from this patient will be selectively used when treating the next patient with similar symptoms. This article describes a surgical planning system that was developed to enable a vascular surgeon to create and test alternative operative plans prior to surgery for a given patient. One-dimensional and three-dimensional hemodynamic (i.e., blood flow) simulations were performed for rest and exercise for operative plans for two aorto-femoral bypass patients and compared with actual postoperative data. The information obtained from one-dimensional (volume flow distribution and pressure losses) and three-dimensional (flow, pressure, and wall shear stress) hemodynamic simulations may be clinically relevant to vascular surgeons planning interventions.

  2. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Acquisition...Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...More Robust Construction Supplies; Oce Equipment; Quality of Life ; and Morale, Welfare, and Recreation PO/TO/DO/BPA Small Purchase Standard Vehicles PO

  3. The infrastructure attitude to strategic planning of information technology in organizations

    Directory of Open Access Journals (Sweden)

    Emad Rezaei

    2016-07-01

    Full Text Available The strategic planning means the future planning of an organization; in other words, it refers to the direction that the organization wants to move in that direction. Strategic planning of the information technology for any organization is an evidence that the organization’s information architecture in light of strategic considerations such as mission, objectives, and priorities of the organization becomes evident and it determines the necessary administration plan to achieve systems and forms the informational databases at the organizational level. To put differently, strategic planning of the information technology charter and the macro program in the field of information systems are generally considered as the information technology. Different approaches are used for planning. Now, the dominant approach for developing the long-term program or for ICT master plan of information technology is an approach of the organizational architecture or the information technology architecture. The purpose of this research is a preliminary introduction with an organizational architecture approach with the means of strategic planning of the information systems.

  4. Predicting Correct Body Posture based on Theory of Planned Behavior in Iranian Operating Room Nurses

    OpenAIRE

    BAHAREH ABEDI; RABIOLLAH FARMANBAR1; SAEED OMIDI; MAHDI JAHANGIR BLOURCHIAN

    2015-01-01

    Due to the importance of correct posture for preventing musculoskeletal disorders, the purpose of this study was to evaluate Theory of Planned Behavior in Predicting correct Body Posture in operating room nurses.In this cross-sectional study, participants (n=100) were nurses from five hospitals located in northern Iran. Participants completed demographic data and theory of planned behavior construct Questionnaires. In addition, the researcher checked the Body Posture of nurses by Rapid Entire...

  5. Counterinsurgency and Operational Art: Is the Joint Campaign Planning Model Adequate?

    Science.gov (United States)

    2003-01-01

    National Campaign Plan (1983)...............................................................................................54 Unidos Para Reconstruir...Insurgency and Counterinsurgency in El Salvador Cuando la historia no se puede con la pluma, hay que escríbirla con el fusil (When history can no...able to shift as easily to a new operational concept as the FMLN. In 1986, the ESAF produced another COIN plan called Unidos Para Reconstruir (United

  6. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shanklin

    2006-06-01

    This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

  7. The Synthesis Method of Automated System of Operational Planning in Low-Space Communication System Messaging

    Directory of Open Access Journals (Sweden)

    Serhii Kovbasiuk

    2017-04-01

    Full Text Available One of the reasons for the decrease of efficiency in low-speed communication systems, satellite communication, which are based on nanoplatform is a high degree of operational planning centralisation. To overcome this problem the method which carries out the distribution of tasks of communications operational planning minimizing the exchange of information between spatially remote sites, and takes into account the computing performance of software and hardware was developed. The technique is based on the use of methods of structural and parametric synthesis, simulation and statistical analysis of the results. Its use allows to obtain the optimal structure of the automated system of operational planning in low-space communication system messaging evaluation of efficiency in terms of fixed communication of information load.

  8. INFORMATION TECHNOLOGY STRATEGIC PLANNING AT PT. VENTURIUM SYSTEM

    Directory of Open Access Journals (Sweden)

    Lola Oktavia

    2013-01-01

    Full Text Available PT. Venturium System Indonesia is a company engaged in IT solutions which serves IT solution for their customers from banking firms in Indonesia. This purpose of this research is to develop a Strategic IT planning for PT. Venturium System Indonesia in accordance with the strategic plan. The applied research method is a framework for IT Strategic Planning of John Ward and Joe Peppard and Enterprise Architecture documentation from Scott A. Bernard. This research uses SWOT analysis and IT Balanced Scorecard to analyze the requirements of IT at PT. Venturium System Indonesia. Results of the analysis are proposed as Information System applications, such as: Knowledge Management System Application, Automatic File Transfer and E-Report which are parts of the IT strategic plan on PT. Venturium System Indonesia. Results of the analysis also generate some policies requirements to be applied by PT. Venturium System Indonesia.

  9. Technologies and solutions for data display in the operating room.

    Science.gov (United States)

    Bitterman, Noemi

    2006-06-01

    Recent advances in technology have led to the introduction of a variety of innovative devices, each with their own platform for data display, into the operating room (OR). While these innovative applications are expanding the traditional boundaries of the surgical space and enhancing treatment capabilities, the introduction of additional screens and displays is placing an ever-increasing load on the OR team. This review describes the main data display platforms currently available in ORs: computer monitors with CRT (cathode ray tube) or LCD (liquid crystal display) screens, suspended imaging displays, wearable computers (WC), auditory displays and tactile (haptic) displays. The different display platforms are evaluated according to their compatibility with the characteristics of the working environment (OR), the monitoring task, and the users (the surgical team). No single display configuration provides an ultimate solution for presenting patient data in the OR. A multi-sensory data display including visual, acoustic and haptic manipulation is suggested as a promising configuration for data display in the OR.

  10. The Role of the Media in The Operational Deception Plan for Operation Desert Storm

    Science.gov (United States)

    1992-04-01

    Schwarzkopf. 60 John M,Broger, "Schwarzkoi0f’s War Plan Based on Deception Los Anodeles Times, 28 Feb. 1991, Sec. A, p. 16. 61 Tim Wqiner.awR’ceotlon Decoys...1991, p. Iz. 117 For one example of this, see Mike Tharp , ’Desert B!:-1..., U.S. News & World Recort, 18 Feb. 1991 p. 14. The article Iieteo a town...It or Not News Media are Needed.’ Air Force Times, 19 Aug. 1991, p. 63. Tharp Mike. ’Desert Bloom.’ U.S. News & World Report, 18 Feb. 1991, p. l4o

  11. Optimal Planning and Operation of Hybrid Energy System Supplemented by Storage Devices

    DEFF Research Database (Denmark)

    Javadi, Mohammad Sadegh; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    This paper presents a two-stage model for optimal planning and operation of a distribution network. Optimal siting and sizing of renewable energy sources (RES) as well as electrical energy storage (EES) systems are considered in the proposed hybrid energy system. In this context, the planning...... problem is considered as a master problem, while there are different sub-problems associated with the short-term operational problem. To properly handle the uncertainties of forecasted load as well as renewable power generations, fair stochastic models are involved in the sub-problems based on historical...

  12. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  13. The Transition from VMS to Unix Operations for STScI's Science Planning and Scheduling Team

    Science.gov (United States)

    Adler, D. S.; Taylor, D. K.

    The Science Planning and Scheduling Team of the Space Telescope Science Institute currently uses the VMS operating system. SPST began a transition to Unix-based operations in the summer of 1999. The main tasks for SPST to address in the Unix transition are: (1) converting the current SPST operational tools from DCL to Python; (2) converting our database report scripts from SQL; (3) adopting a Unix-based code management system; and (4) training the SPST staff. The goal is to fully transition the team to Unix operations by the end of 2001.

  14. Promise, Perils, and Planning: An Administrative Commentary on the Use of Technology To Expand Reference Services.

    Science.gov (United States)

    Allen, Nancy

    1999-01-01

    Presents an administrative overview on planning needed to implement information technology-based reference and instructional services in academic libraries. Discusses staffing; troubleshooting; fund raising and budget development; consortia and digital resources; and the need for continuing education. (LRW)

  15. \\t Capital Planning and Investment Control (CPIC) for the Management of Information Technology Investments

    Science.gov (United States)

    Capital Planning and Investment Control (CPIC) is the Information Technology (IT) governance and management methodology in use at EPA for selecting, controlling and evaluating the performance of EPA IT investments throughout the full lifecycle.

  16. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  17. Outlook of PetroChina's Technological Development during the 11th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ The 11th Five-Year Plan period is a critical time for PetroChina transforming to a transnational enterprise group with international competitiveness, also a turning point for the implementation of its scientific and technological strategy.

  18. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  19. Three essays on the effect of wind generation on power system planning and operations

    Science.gov (United States)

    Davis, Clay Duane

    While the benefits of wind generation are well known, some drawbacks are still being understood as wind power is integrated into the power grid at increasing levels. The primary difference between wind generation and other forms of generation is the intermittent, and somewhat unpredictable, aspect of this resource. The somewhat uncontrollable aspect of wind generation makes it important to consider the relationship between this resource and load, and also how the operation of other non-wind generation resources may be affected. The three essays that comprise this dissertation focus on these and other important issues related to wind generation; leading to an improved understanding of how to better plan for and utilize this resource. The first essay addresses the cost of increased levels of installed wind capacity from both a capacity planning and economic dispatch perspective to arrive at the total system cost of installing a unit of wind capacity. This total includes not only the cost of the wind turbine and associated infrastructure, but also the cost impact an additional unit of wind capacity has on the optimal mix and operation of other generating units in the electricity supply portfolio. The results of the model showed that for all wind expansion scenarios, wind capacity is not cost-effective regardless of the level of the wind production tax credit and carbon prices that were considered. Larger levels of installed wind capacity result in reduced variable cost, but this reduction is not able to offset increases in capital cost, as a unit of installed wind capacity does not result in an equal reduction in other non-wind capacity needs. The second essay develops a methodology to better handle unexpected short term fluctuations in wind generation within the existing power system. The methodology developed in this essay leads to lower expected costs by anticipating and planning for fluctuations in wind generation by focusing on key constraints in the system. The

  20. Robotics Scoping Study to Evaluate Advances in Robotics Technologies that Support Enhanced Efficiencies for Yucca Mountain Repository Operations

    Energy Technology Data Exchange (ETDEWEB)

    T. Burgess; M. Noakes; P. Spampinato

    2005-03-17

    This paper presents an evaluation of robotics and remote handling technologies that have the potential to increase the efficiency of handling waste packages at the proposed Yucca Mountain High-Level Nuclear Waste Repository. It is expected that increased efficiency will reduce the cost of operations. The goal of this work was to identify technologies for consideration as potential projects that the U.S. Department of Energy Office of Civilian Radioactive Waste Management, Office of Science and Technology International Programs, could support in the near future, and to assess their ''payback'' value. The evaluation took into account the robotics and remote handling capabilities planned for incorporation into the current baseline design for the repository, for both surface and subsurface operations. The evaluation, completed at the end of fiscal year 2004, identified where significant advantages in operating efficiencies could accrue by implementing any given robotics technology or approach, and included a road map for a multiyear R&D program for improvements to remote handling technology that support operating enhancements.

  1. Strategic operations planning - it's not just for wilderness! How the Strategic Operations Planner can help

    Science.gov (United States)

    Charles W. McHugh; Stu Hoyt; Brett Fay

    2015-01-01

    The Strategic Operational Planner (SOPL) wildland fire management position was created in the United States in 2009 to reflect updated terminology. SOPL merges the former Fire Use Manager positions (FUM1 and FUM2) and is now an established position within the Incident Command System. Traditionally, the FUM positions and the SOPL have been used on incidents managed for...

  2. Systemic Operational Design: Improving Operational Planning for the Netherlands Armed Forces

    Science.gov (United States)

    2006-05-25

    This methodology is called Soft Systems Methodology . His methodology is a structured way of thinking in which not only a perceived problematic...Many similarities exist between Systemic Operational Design and Soft Systems Methodology , their epistemology is related. Furthermore, they both have...Systems Thinking: Managing Chaos and Complexity. Boston: Butterworth Heinemann, 1999. Checkland, Peter, and Jim Scholes. Soft Systems Methodology in

  3. Exploring the strengths and weaknesses of European innovation capacity within the Strategic Energy Technologies (SET) Plan

    OpenAIRE

    Drmac, I.; Jakšic, D.; Karadža, N.; Kunze, R.; Dehler, J.; R. MIGLIO; Shivakumar, A.; Beltramo, A; Romero Nevado, M.; Welsch, M.; Basslim, M.; Lojanica, M.; Dobbins, A.

    2016-01-01

    This report explored the strengths and weaknesses of the European innovation capacity within the Strategic Energy Technologies (SET) Plan Integrated Roadmap through the assessment of energy technology R&I in these specific sectors. The methodology is based on collating publicly available data and compares how the EU performs in comparison to other key countries worldwide through key indicators (e.g., patents, publications and export/import) across these 13 SET Plan themes.

  4. DEPARTMENT OF ENERGY SOIL AND GROUNDWATER SCIENCE AND TECHNOLOGY NEEDS, PLANS AND INITIATIVES

    Energy Technology Data Exchange (ETDEWEB)

    Aylward, B; V. ADAMS, V; G. M. CHAMBERLAIN, G; T. L. STEWART, T

    2007-12-12

    This paper presents the process used by the Department of Energy (DOE) Environmental Management (EM) Program to collect and prioritize DOE soil and groundwater site science and technology needs, develop and document strategic plans within the EM Engineering and Technology Roadmap, and establish specific program and project initiatives for inclusion in the EM Multi-Year Program Plan. The paper also presents brief summaries of the goals and objectives for the established soil and groundwater initiatives.

  5. 49 CFR 244.13 - Subjects to be addressed in a Safety Integration Plan involving an amalgamation of operations.

    Science.gov (United States)

    2010-10-01

    ... REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF... train control devices and systems; (6) Hazardous materials personnel, including information technology... communication standards; (3) Emergency response procedures; and (4) Information technology systems and...

  6. A Study on the Planning of Technology Development and Research for Generation IV Nuclear Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Moon Hee; Kim, H. R.; Kim, H. J. and others

    2005-08-15

    This study aimed at the planning the domestic technology development of the Gen IV and the formulating the international collaborative project contents and executive plan for 'A Validity Assessment and Policies of the R and D of Generation IV Nuclear Energy Systems'. The results of the study include follows; - Survey of the technology state in the fields of the Gen IV system specific technologies and the common technologies, and the plans of the international collaborative research - Drawing up the executive research and development plan by the experts of the relevant technology field for the systems which Korean will participate in. - Formulating the effective conduction plan of the program reflecting the view of the experts from the industry, the university and the research institute. - Establishing the plan for estimation of the research fund and the manpower for the efficient utilization of the domestic available resources. This study can be useful material for evaluating the appropriateness of the Korea's participation in the international collaborative development of the Gen IV, and can be valuably utilized to establish the strategy for the effective conduction of the program. The executive plan of the research and development which was produced in this study will be used to the basic materials for the establishing the guiding direction and the strategic conduction of the program when the research and development is launched in the future.

  7. Controlled cooling technology for bar and rod mills -- Computer simulation and operational results

    Energy Technology Data Exchange (ETDEWEB)

    Mauk, P.J.; Kruse, M.; Plociennik, U. [SMS Schloemann-Siemag AG, Dusseldorf (Germany)

    1995-09-01

    The Controlled Cooling Technology (CCT) developed by SMS to simulate the rolling process and automatic control of the water cooling sections is presented. The Controlled Rolling and Cooling Technology (CRCT) model is a key part of the CCT system. It is used to simulate temperature management for the rolling stock on the computer before the actual rolling process takes place. This makes it possible to dispense with extensive rolling tests in the early stages of project planning and to greatly reduce the extent of such tests prior to the start of commercial production in a rolling mill. The CRCT model has been in use at Von Moos Stahl Ag for three years. It demonstrates that, by targeted improvement of the set-up values in both the technology and the plant, it is possible to improve microstructure quality and achieve better geometrical parameters in the rolled products. Also, the results gained with the CCT system in practical operation at the Kia Steel Bar Mill, Kunsan, Korea, are presented.

  8. Science and Technology Roadmapping to Support Project Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mc Carthy, Jeremiah Justin; Haley, Daniel Joseph; Dixon, Brent Wayne

    2001-07-01

    Disciplined science and technology roadmapping provides a framework to coordinate research and development activities with project objectives. This case-history paper describes initial project technology needs identification, assessment and R&D ranking activities supporting characterization of 781 waste tanks requiring a 'hazardous waste determination' or 'verification of empty' decision to meet an Idaho state Voluntary Consent Order.

  9. Advanced Education and Technology Business Plan, 2010-13. Highlights

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2010

    2010-01-01

    The Ministry of Advanced Education and Technology envisions Alberta's prosperity through innovation and lifelong learning. Advanced Education and Technology's mission is to lead the development of a knowledge-driven future through a dynamic and integrated advanced learning and innovation system. This paper presents the highlights of the business…

  10. Advanced Education and Technology Business Plan, 2009-12

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2009

    2009-01-01

    The Ministry of Advanced Education and Technology consists of the following entities for budget purposes: Department of Advanced Education and Technology, the Access to the Future Fund, Alberta Enterprise Corporation, Alberta Research Council Inc., and iCORE Inc. Achieving the Ministry's goals involves the work and coordination of many…

  11. Clean Technology Fund Investment Plan Approved for Concentrated Solar Power in the MENA Region

    OpenAIRE

    Coma-Cunill, Roger; Govindarajalu, Chandra; Pariente-David, Silvia; Walters, Jonathan

    2009-01-01

    The Middle East and North Africa (MENA) clean technology fund investment plan proposes co-financing of $750 million and mobilizes an additional $4.85 billion from other sources to accelerate deployment of Concentrated Solar Power (CSP) by investing in the CSP expansion programs of Algeria, Egypt, Jordan, Morocco and Tunisia. Specifically, the Investment Plan will support MENA countries to ...

  12. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  13. Applying the Art of Systems and Organizational Architecting in Order to Implement Operational Design into Marine Corps Planning Doctrine

    Science.gov (United States)

    2011-09-01

    Making Process OEF Operation Enduring Freedom OIF Operational Iraqi Freedom OPORDS Operational Orders RSE Rapid Systems Engineering TTPs Tactics...and Complexity, A Platform for Designing Business Architecture and elements of Rapid Systems Engineering ( RSE ) as applied by Professor Gary Langford...planning process combines elements of business design (Gharajedaghi, 2006) and RSE (Langford, 2006) to create a more robust design-planning continuum

  14. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    Science.gov (United States)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  15. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  16. Intersectoral public policy from cultural planning. Economy, science and technology in the cultural planning

    Directory of Open Access Journals (Sweden)

    Santiago Niño Morales

    2010-11-01

    Full Text Available The present work is the result of the author's participation in the Plan de Desarrollo Cultural de Medellín 2010-2020, (Medellin's Cultural Development Plan 2010-2020, as well as reflections on the basis of cultural planning in Bogotá. The central argument is that the city’s cultural development plan vertebrates its entire development plan. The approach here presented claims for the centrality of the cultural sector (Mánito, 2006 on the agenda of the city's socioeconomic development. In this sense the argument relies on several theoretical contributions, including the consideration made by the Ibero-American Centre for Strategic Urban Development (Centro Iberoamericano de Desarrollo Estratégico Urbano - CIDEU.

  17. The Information Revolution Planning for Institutional Change, The NPS Information Technology Strategic Plan / FY 2003

    OpenAIRE

    2003-01-01

    The Joint Vision of NPS outlines the future goals for the institution within the context of national priorities and defines academic goals through excellence in scholarly accomplishment and peer recognition. It requires that our faculty and staff are experienced in using modern technologies for teaching and learning. We must nurture and sustain efforts in high performance computing, multi-media technology, educational technology, and the technology of distance education.

  18. U.S. Climate Change Technology Program: Strategic Plan

    Science.gov (United States)

    2006-09-01

    Australia, Brazil, Canada, China, Colombia, Ecuador , Germany, India, Italy, Japan, Mexico, Nigeria, Russia, South Korea, Ukraine, and the United Kingdom) and...the readily decomposable organic constituents of the waste stream through enhanced microbiological processes. The goal is to have three to five...2005a) describes an aggressive systems microbiology plan to accelerate the scientific discovery needed to support such developments. Basic research in

  19. A Strategic Plan for Marketing Hot Dry Rock Technology

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    This appears to be run of the mill market analysis and planning. Its premature nature (there is no HDR on line in the U.S. in 2005) bespeaks the optimism of the managers of the LASL HDR program in its early year. ( DJE 2005)

  20. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  1. Harvest operations for density management: planning requirements, production, costs, stand damage, and recommendations

    Science.gov (United States)

    Loren D. Kellogg; Stephen J. Pilkerton

    2013-01-01

    Since the early 1990s, several studies have been undertaken to determine the planning requirements, productivity, costs, and residual stand damage of harvest operations in thinning treatments designed to promote development of complex forest structure in order to enhance ecological functioning and biological diversity. Th ese studies include the Oregon State...

  2. 77 FR 16676 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... contained in the Commonwealth's Implementation Plan and Operating Permits Program. They do not change the... Clean Air Act (CAA or Act), the Commonwealth of Puerto Rico is regarded as a state. Generally the...

  3. 77 FR 16795 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program... Regulations'' section of this Federal Register, EPA is approving the Commonwealth's SIP submittal as a direct...

  4. Plan for the Startup of HA-21I Furnace Operations at the Plutonium Finishing Plant (PFP)

    Energy Technology Data Exchange (ETDEWEB)

    WILLIS, H.T.

    2000-02-17

    Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given. The Startup Plan provides a phased approach that bridges the activities between the completion of the Activity Based Startup Review authorizing the use of the three additional furnaces and the unrestricted operation of the five thermal stabilization muffle furnaces. The four phases are: (1) the initiation of five furnace operations using three empty (simulated full) boat charges from HA-211 and two full charges from HC-21C; (2) three furnace operations (one full charge from HA-211 and two full charges from HC-21C); (3) four furnace operations (two full charges from HA-211 and two full charges from HC-21C); and (4) integrated five furnace operations and unrestricted operations. Phase 1 of the Plan will be considered as the cold runs. This Plan also provides management oversight and administrative controls that are to be implemented until unrestricted operations are authorized. It also provides a formal review process for ensuring that all preparations needed for full five furnace operations are completed and formally reviewed prior to proceeding to the increased activity levels associated with five furnace operations. Specific objectives include: (1) To ensure that activities are conducted in a safe manner. (2) To provide supplemental

  5. Professionalising the asphalt construction process: aligning information technologies, operators' knowledge and laboratory practices

    NARCIS (Netherlands)

    Bijleveld, Frank Roland

    2015-01-01

    This research addresses the need to professionalise the asphalt construction process. A distinctive action research strategy is designed and carried out to progressively improve operational strategies of asphalt teams from technological, human (operator) and laboratory perspectives. Using informatio

  6. Power Tower Technology Roadmap and cost reduction plan.

    Energy Technology Data Exchange (ETDEWEB)

    Mancini, Thomas R.; Gary, Jesse A. (U.S. Department of Energy); Kolb, Gregory J.; Ho, Clifford Kuofei

    2011-04-01

    Concentrating solar power (CSP) technologies continue to mature and are being deployed worldwide. Power towers will likely play an essential role in the future development of CSP due to their potential to provide dispatchable solar electricity at a low cost. This Power Tower Technology Roadmap has been developed by the U.S. Department of Energy (DOE) to describe the current technology, the improvement opportunities that exist for the technology, and the specific activities needed to reach the DOE programmatic target of providing competitively-priced electricity in the intermediate and baseload power markets by 2020. As a first step in developing this roadmap, a Power Tower Roadmap Workshop that included the tower industry, national laboratories, and DOE was held in March 2010. A number of technology improvement opportunities (TIOs) were identified at this workshop and separated into four categories associated with power tower subsystems: solar collector field, solar receiver, thermal energy storage, and power block/balance of plant. In this roadmap, the TIOs associated with power tower technologies are identified along with their respective impacts on the cost of delivered electricity. In addition, development timelines and estimated budgets to achieve cost reduction goals are presented. The roadmap does not present a single path for achieving these goals, but rather provides a process for evaluating a set of options from which DOE and industry can select to accelerate power tower R&D, cost reductions, and commercial deployment.

  7. New problem with sales, inventories, and operations planning in a supply chain environment

    Science.gov (United States)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  8. Using operations research to plan the british columbia registered nurses' workforce.

    Science.gov (United States)

    Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A

    2008-11-01

    The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities.

  9. The Technology for Intensification of Chemical Reaction Process Envisaged in the "863" Plan

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ It is learned from the Ministry of Science and Technology that in order to promote the shift of China's chemical industry toward an energy efficient and environmentally friendly product mode, the technology for intensification of chemical reaction processes has been included in the National "863" Project of the "Eleventh Five-Year Plan", and the application for research project proposals is to be accepted.

  10. Just-in-time support for teachers’ technology-infused lesson planning

    NARCIS (Netherlands)

    Janssen, N.; Lazonder, A.W.

    2015-01-01

    Teachers need support when integrating innovative technologies in their lessons. In this research, two types of just-in-time support for lesson planning were compared on perceived usefulness and effectiveness. Both types contained the same technological information but differed regarding pedagogical

  11. Strategic Planning for Educational Technology Initiatives in PK-12 Lutheran Schools

    Science.gov (United States)

    Muth, Nicole

    2012-01-01

    Technology rich learning environments provide the potential for engaging, relevant, and personalized curricula that prepare students for 21st century careers. However, a lack of strategic planning by educators results in available technology not being used to its fullest potential. Several educational organizations have published guidelines for…

  12. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, Richard B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colwell, Jeffery A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  13. School District Information Technology Disaster Recovery Planning: An Explanatory Case Study

    Science.gov (United States)

    Gray, Shaun L.

    2017-01-01

    Despite research and practitioner articles outlining the importance information technology disaster plans (ITDRPs) to organizational success, barriers have impeded the process of disaster preparation for Burlington County New Jersey school districts. The purpose of this explanatory qualitative case study was to understand how technology leader…

  14. Implementing Innovative Technologies Through Lesson Plans: What Kind of Support Do Teachers Prefer?

    NARCIS (Netherlands)

    Janssen, Noortje; Lazonder, Ard W.

    2015-01-01

    Lesson plans are a potentially powerful means to facilitate teachers’ use of technology in the classroom. This study investigated which supplementary information is preferred by teachers when integrating a new technology into the classroom. Forty-six high school biology teachers (23 pre-service and

  15. Using virtual reality technology to include field operators in simulation and training

    Energy Technology Data Exchange (ETDEWEB)

    Nystad, E.; Strand, S. [OECD Halden Reactor Project (Norway)]. E-mail: espen.nystad@hrp.no

    2006-07-01

    By using virtual reality technology, field operators can be included in simulator training. A study has been performed where field operators could perform their activities in a virtual plant and communicate with a control room operator who was placed in a physical control room simulator. This paper describes the use of VR technology in the study and how the operators experienced interacting with the virtual plant. (author)

  16. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  17. The effect of virtual reality and training on liver operation planning.

    Science.gov (United States)

    Herfarth, C; Lamadé, W; Fischer, L; Chiu, P; Cardenas, C; Thorn, M; Vetter, M; Grenacher, L; Meinzer, H P

    2002-01-01

    The three-dimensional relation of a liver tumour to the intrahepatic vascular trees is basis of operation planning in liver surgery. Yet it has not been proven whether 3D reconstruction and further computerised processing will enhance precision of operation planning in liver surgery which has been based on the liver segment classification of Couinaud up to now. Our interdisciplinary group (department of Surgery, German Cancer Research Center and Department of Radiology) has developed a new interactive computer-based quantitative 3D operation planning system for liver surgery which is being introduced into the clinical routine. The system quantifies the organ structures semiautomatically, defines resection planes depending on safety margins and the vascular trees, and presents the data in digital movies as well as in quantitative reports. We conducted a clinical trial to evaluate whether 3D reconstruction will lead to an improved operation planning. Data of 7 virtual patients were presented to a total of 81 surgeons in different levels of training. The tumours had to be assigned to a liver segment and subsequently drawn together with the operation proposals into a liver model. The precision of both was measured quantitatively for each surgeon and stratified concerning 2D and different types of 3D presentations. The 3D anatomy can be visualised in high quality which results in good perception of the third dimension (depth). Tumour assignment to liver segments was significantly correlated to the level of training (p classification of the liver segments compared to the true vascular anatomy of up to 40% were found. The impact of individual 3D-reconstruction on surgical planning has been proven to be significant and increases precision quantitatively. The merit of Couinaud's classification may be enhanced by individualisation of the segment borders in future.

  18. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

  19. Manufacturing Resource Planning Technology Based on Genetic Programming Simulation

    Institute of Scientific and Technical Information of China (English)

    GAO Shiwen; LIAO Wenhe; GUO Yu; LIU Jinshan; SU Yan

    2009-01-01

    Network-based manufacturing is a kind of distributed system, which enables manufacturers to finish production tasks as well as to grasp the opportunities in the market, even if manufacturing resources are insufficient. One of the main problems in network-based manufacturing is the allocation of resources and the assignment of tasks rationally, according to flexible resource distribution. The mapping rules and relations between production techniques and resources are proposed, followed by the definition of the resource unit. Ultimately, the genetic programming method for the optimization of the manufacturing system is put forward. A set of software for the optimization system of simulation process using genetic programming techniques has been developed, and the problems of manufacturing resource planning in network-based manufacturing are solved with the simulation of optimizing methods by genetic programming. The optimum proposal of hardware planning, selection of company and scheduling will be obtained in theory to help company managers in scientific decision-making.

  20. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...... & Maintenance of offshore wind turbines. Further, the paper considers models for uncertainty modelling and reliability assessment of structural components such as tower, blades, substructure and foundation as well as cast steel drivetrain components. The function of a wind turbine is highly dependent on many...... electrical and mechanical components as well as a control system also reliability aspects of these components are discussed in the paper. Illustrative examples are presented considering uncertainty modelling, reliability assessment and risk-based planning of Operation & Maintenance....

  1. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  2. Plan of Using Modern Agriculture High-New Information Technology for Building Stable Nation Commercial Grain and Green Agriculture Base of China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    The North-East China is nation commercial grain base of China. It provides important grain supply for other areas of the country every year. The nation and modern farmers are looking for advanced technological solutions to increase production and preserve environment. Considering of this aim,this paper introduce a new planning that using 3S technology to develop precision farming, explaining its technology frame, operation steps and advantages. On the other hand,this paper also introduce the concept of precision farming and discusses the role of 3S technology as a data collection,management and analysis tool.

  3. Optimization and planning of operating theatre activities: an original definition of pathways and process modeling.

    Science.gov (United States)

    Barbagallo, Simone; Corradi, Luca; de Ville de Goyet, Jean; Iannucci, Marina; Porro, Ivan; Rosso, Nicola; Tanfani, Elena; Testi, Angela

    2015-05-17

    The Operating Room (OR) is a key resource of all major hospitals, but it also accounts for up 40% of resource costs. Improving cost effectiveness, while maintaining a quality of care, is a universal objective. These goals imply an optimization of planning and a scheduling of the activities involved. This is highly challenging due to the inherent variable and unpredictable nature of surgery. A Business Process Modeling Notation (BPMN 2.0) was used for the representation of the "OR Process" (being defined as the sequence of all of the elementary steps between "patient ready for surgery" to "patient operated upon") as a general pathway ("path"). The path was then both further standardized as much as possible and, at the same time, keeping all of the key-elements that would allow one to address or define the other steps of planning, and the inherent and wide variability in terms of patient specificity. The path was used to schedule OR activity, room-by-room, and day-by-day, feeding the process from a "waiting list database" and using a mathematical optimization model with the objective of ending up in an optimized planning. The OR process was defined with special attention paid to flows, timing and resource involvement. Standardization involved a dynamics operation and defined an expected operating time for each operation. The optimization model has been implemented and tested on real clinical data. The comparison of the results reported with the real data, shows that by using the optimization model, allows for the scheduling of about 30% more patients than in actual practice, as well as to better exploit the OR efficiency, increasing the average operating room utilization rate up to 20%. The optimization of OR activity planning is essential in order to manage the hospital's waiting list. Optimal planning is facilitated by defining the operation as a standard pathway where all variables are taken into account. By allowing a precise scheduling, it feeds the process of

  4. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, R L; Price, D E; Spero, K K

    2005-06-06

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  5. Vulnerability And Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, Jr., R L; Price, D E; Spero, K K

    2005-01-03

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities is presented.

  6. Application of genetic algorithm to the technological operations scheduling problem

    Directory of Open Access Journals (Sweden)

    Lujić, R.

    2008-04-01

    Full Text Available The basic enterprise task is to satisfy customer requirements: due date, price and quality. Based on experiences from engineers practice of work in Croatian enterprises it could be concluded that enterprises are not able to fulfil obligations to the customer in a way of due dates. One of the basic reasons lies in inappropriate scheduling model that has not had possibility to make plan variants. The paper shows how genetic algorithm could be successfully applied in scheduling model to solve the problem of plan variant. As a basic selection in the paper 3-tournament steady-state selection has been applied.

  7. Plan for the design, development, and implementation, and operation of the National Water Information System

    Science.gov (United States)

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  8. Optimal mechanical harvester route planning for sugarcane f ield operations using particle swarm optimization

    Directory of Open Access Journals (Sweden)

    Woraya Neungmatcha

    2015-06-01

    Full Text Available Since current agricultural production systems such as the sugarcane supply system in the sugar industry are developing towards larger and more complicated systems, there is consequently increasing use of agricultural machinery. Even though mechanization can help to increase the sugarcane yield, if the mechanical operation efficiency is low, then higher harvest costs and machinery shortages will occur. Global route planning for mechanical harvesters is one of the most important problems in the field of sugarcane harvesting and transporting operations. Improved efficiency and realistic implementation can be achieved by applying advanced planning methods for the execution of field operations, especially considering the field accessibility aspect. To address this issue, participative research was undertaken with a sugar milling company to produce and implement a mixed integer programming model that represents the mechanical harvester route plan. Particle swarm optimization was applied to find a solution to the model, leading to potential cost savings versus schedules produced manually by the mill officer. The model was also applied to explore regional planning options for a more integrated harvesting and transport system.

  9. A Strategic Science and Technology Planning and Development Process Model

    Science.gov (United States)

    2005-02-01

    developed process model to the research and technology initiatives of the U.S. Army Tank-Automotive Research, Development and Engineering Center...action teams were formed (under change management sponsorship of a champion) to formulate and implement an improved process model considered essential

  10. Advanced Education and Technology Business Plan, 2011-14

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2011

    2011-01-01

    Advanced Education and Technology's mission is to lead the development of a knowledge-driven future through a dynamic and integrated advanced learning and innovation system. Its core businesses are to: (1) provide strategic leadership for Campus Alberta and Alberta Innovates; and (2) engage learners, industry and the community in learning…

  11. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    Science.gov (United States)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case

  12. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  13. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  14. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  15. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.

  16. Nursing operations automation and health care technology innovations: 2025 and beyond.

    Science.gov (United States)

    Suby, ChrysMarie

    2013-01-01

    This article reviews why nursing operations automation is important, reviews the impact of computer technology on nursing from a historical perspective, and considers the future of nursing operations automation and health care technology innovations in 2025 and beyond. The increasing automation in health care organizations will benefit patient care, staffing and scheduling systems and central staffing offices, census control, and measurement of patient acuity.

  17. Energy Technology Initiatives 2013. Implementation through Multilateral Co-operation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-01

    Ensuring energy security and addressing climate change cost-effectively are key global challenges. Tackling these issues will require efforts from stakeholders worldwide. To find solutions, the public and private sectors must work together, sharing burdens and resources, while at the same time multiplying results and outcomes. Through its broad range of multilateral technology initiatives (Implementing Agreements), the IEA enables member and non-member countries, businesses, industries, international organisations and non-governmental organisations to share research on breakthrough technologies, to fill existing research gaps, to build pilot plants and to carry out deployment or demonstration programmes across the energy sector. This publication highlights the most significant recent achievements of the IEA Implementing Agreements. At the core of the IEA energy technology network, these initiatives are a fundamental building block for facilitating the entry of new and improved energy technologies into the marketplace.

  18. User-oriented data acquisition chain task planning algorithm for operationally responsive space satellite

    Institute of Scientific and Technical Information of China (English)

    Hao Chen; Jun Li; Ning Jing

    2016-01-01

    With the development of operational y responsive space (ORS) and on-board processing techniques, the end users can receive the observation data from the ORS satel ite directly. To satisfy the demand for reducing the requirements-tasking-effects cycle from one day to hours, the various resources of the whole data acquisition chain (including satel ites, ground stations, data processing centers, users, etc.) should be taken into an overal consideration, and the traditional batch task planning mode should be transformed into the user-oriented task planning mode. Con-sidering there are many approaches for data acquisition due to the new techniques of ORS satel ite, the data acquisition chain task planning problem for ORS satel ite can be seen as the multi-modal route planning problem. Thereby, a framework is presented using label-constrained shortest path technique with the conflict resolution. To apply this framework to solve the ORS satel ite task planning problem, the preprocessing and the conflict resolution strategies are discussed in detail. Based on the above work, the user-oriented data acquisition chain task planning algorithm for ORS satel ite is proposed. The exact solution can be obtained in polynomial time using the proposed algorithm. The simulation experiments validate the feasibility and the adaptability of the pro-posed approach.

  19. Semiconductor terahertz technology devices and systems at room temperature operation

    CERN Document Server

    Carpintero, G; Hartnagel, H; Preu, S; Raisanen, A

    2015-01-01

    Key advances in Semiconductor Terahertz (THz) Technology now promises important new applications enabling scientists and engineers to overcome the challenges of accessing the so-called "terahertz gap".  This pioneering reference explains the fundamental methods and surveys innovative techniques in the generation, detection and processing of THz waves with solid-state devices, as well as illustrating their potential applications in security and telecommunications, among other fields. With contributions from leading experts, Semiconductor Terahertz Technology: Devices and Systems at Room Tempe

  20. Current status and science operations plan of BepiColombo MMO

    Science.gov (United States)

    Murakami, G.; Fujimoto, M.

    2016-12-01

    BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The baseline mission consists of two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The two orbiters will be launched in 2018 by an Ariane-5 and arrive at Mercury in 2024. Being a spin-stabilized spacecraft, MMO has much less constraint for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. JAXA is responsible for the development and operations of MMO, and it's almost ready for launch. Therefore, now we can concentrate on preparing the science operations plans. MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part ( 20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we must optimize the science observation and downlink plans in detail. In this paper, we introduce the science objectives, operations strategies and plans of MMO.