WorldWideScience

Sample records for technology implementation plan

  1. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  2. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  3. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-07-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9830-5] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional...

  4. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9901-58-Region 9] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional Haze...

  5. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  6. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  7. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  8. Identification and assessment of site treatment plan implementation opportunities for emerging technologies

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1995-01-01

    The Department of Energy (DOE), in response to the 1992 Federal Facility Compliance Act, has prepared Site Treatment Plans (STP) for the approximately 2,000 waste streams identified within its mixed waste inventory Concurrently, emerging mixed waste treatment technologies are in final development. This paper defines a three-phase process to identify and assess implementation opportunities for these emerging technologies within the STP. It highlights the first phase, functional matching of expected treatment capabilities with proposed treatment requirements. Matches are based on treatment type, regulated contaminant and waste matrix type, for both capabilities and requirements. Results identify specific waste streams and volumes that could be treated by each emerging technology. A study for Plasma Hearth Process, Delphi DETOX sm , Supercritical Water Oxidation and Vitrification shows that about 200,000 ml of DOE's mixed waste inventory can potentially be treated by one or more of these emerging technologies. Actual implementations are small fractions of the treatable inventory. Differences between potential and actual implementations must be minimized to accrue optimum benefit from implementation of emerging or alternative treatment technologies. Functional matching is the first phase in identifying and quantifying benefits, addressing technology system and treatment issues, and providing, in part, the basis for STP implementation decisions. DOE, through EM's Office of Technology Development, has funded this work

  9. Identification and assessment of site treatment plan implementation opportunities for emerging technologies

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, E.A. [Sandia National Labs., Germantown, MD (United States)

    1995-12-31

    The Department of Energy (DOE), in response to the 1992 Federal Facility Compliance Act, has prepared Site Treatment Plans (STP) for the approximately 2,000 waste streams identified within its mixed waste inventory Concurrently, emerging mixed waste treatment technologies are in final development. This paper defines a three-phase process to identify and assess implementation opportunities for these emerging technologies within the STP. It highlights the first phase, functional matching of expected treatment capabilities with proposed treatment requirements. Matches are based on treatment type, regulated contaminant and waste matrix type, for both capabilities and requirements. Results identify specific waste streams and volumes that could be treated by each emerging technology. A study for Plasma Hearth Process, Delphi DETOX{sup sm}, Supercritical Water Oxidation and Vitrification shows that about 200,000 ml of DOE`s mixed waste inventory can potentially be treated by one or more of these emerging technologies. Actual implementations are small fractions of the treatable inventory. Differences between potential and actual implementations must be minimized to accrue optimum benefit from implementation of emerging or alternative treatment technologies. Functional matching is the first phase in identifying and quantifying benefits, addressing technology system and treatment issues, and providing, in part, the basis for STP implementation decisions. DOE, through EM`s Office of Technology Development, has funded this work.

  10. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  11. Supporting teachers' technology integration in lesson plans

    NARCIS (Netherlands)

    Janssen, Noortje

    2017-01-01

    Lesson planning offers rich opportunities for teachers to consider and implement technology in the classroom. This dissertation investigated the design and effectiveness of supplementary information to assist pre-service teachers during the lesson planning process. Based on the Technological,

  12. Development planning and appropriate technology: a dilemma and a proposal

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, G.

    1981-03-01

    This paper examines the present system of project paper preparation and project planning used by the US Agency for International Development and many donor agencies. Three approaches for meeting the evident weaknesses of the system - a holistic approach to the planning problem, an operant-conditioning approach to implementation, and a process approach to planning and implementation - are presented and critiqued. On the basis of the critique, an approach grounded in a search for an approximately appropriate technology is supported; and a proposal for an appropriate-technology evaluation system which would analyze alternative technologies, deliver information to the field level, supply needed information on technologies and implementation, constrain donor planners, reduce lag time, incorporate evaluations into future planning, and reduce dependence upon planners is presented. 66 references.

  13. Implementing Educational Technology in Higher Education: A Strategic Approach

    Directory of Open Access Journals (Sweden)

    Cynthia C. Roberts

    2008-01-01

    Full Text Available Although the move toward implementing technology in higher education is driven by an increasing number of competitors as well as student demand, there is still considerable resistance to embracing it. Adoption of technology requires more that merely installing a product. This paper outlines a framework for a strategic change process that can be utilized by educators for the purpose of the selection as well as successful implementation of educational technologies within their setting, in particular, online course management systems. The four steps of this process include strategic analysis, strategy making, strategic plan design, and strategic plan implementation. The choice to embrace a new system and the extent and speed of its implementation depends upon internal factors such as resources, organizational culture, faculty readiness, anticipated degree of resistance, and the degree of variance from the status quo. A case from the author’s experience provides one example of how the use of distance learning technology was strategically implemented.

  14. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  15. Emerging and Disruptive Technologies for Education: An Analysis of Planning, Implementation, and Diffusion in Florida's Eleven State University System Institutions

    Science.gov (United States)

    Bradford, Deborah J.

    2010-01-01

    The purpose of the study was to understand and appreciate the methodologies and procedures used in determining the extent to which an information technology (IT) organization within the eleven member State University Systems (SUS) of Florida planned, implemented, and diffused emerging educational technologies. Key findings found how critical it…

  16. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  17. Strategic Planning for Computer-Based Educational Technology.

    Science.gov (United States)

    Bozeman, William C.

    1984-01-01

    Offers educational practitioners direction for the development of a master plan for the implementation and application of computer-based educational technology by briefly examining computers in education, discussing organizational change from a theoretical perspective, and presenting an overview of the planning strategy known as the planning and…

  18. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  19. Optimized planning methodologies of ASON implementation

    Science.gov (United States)

    Zhou, Michael M.; Tamil, Lakshman S.

    2005-02-01

    Advanced network planning concerns effective network-resource allocation for dynamic and open business environment. Planning methodologies of ASON implementation based on qualitative analysis and mathematical modeling are presented in this paper. The methodology includes method of rationalizing technology and architecture, building network and nodal models, and developing dynamic programming for multi-period deployment. The multi-layered nodal architecture proposed here can accommodate various nodal configurations for a multi-plane optical network and the network modeling presented here computes the required network elements for optimizing resource allocation.

  20. The experiences from implementing decision support technology to address water management plans in an operational environment

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, S. [4DM Inc., Toronto, ON (Canada); Tonkin, C. [Ontario Power Generation Inc., Toronto, ON (Canada)

    2005-07-01

    This presentation described Ontario Power Generation's experience in implementing a decision support tool to enable water management plans for its operations through technology solutions. All hydroelectric producers in Ontario are required to make water management plans in order to maintain water levels and flows in their operating regions. This regulation was created in response to environmental concerns as well as to changes in the electricity market and growth of residential and cottage property near water bodies. In order to keep informed and to address compliance issues, operators and managers need situation awareness information to balance operational decisions. The online Adaptive Water Management System (AWMS) decision support tool was recently adopted by Ontario Power Generation to provide information needed to address the requirements of Water Management Plans. The AWMS provides users with information on water levels and flows; the ability to implement, modify, and manage daily instructions at the facilities; track conditions in the watershed; and, provide a status of compliance. The tool was developed by 4DM Inc. in collaboration with Ottawa St. Lawrence Plant Group for the Madawaska River Watershed Management, a model partnership between operator, regulator and Public Advisory Committee to develop a water management plan.

  1. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  2. New technology planning and approval: critical factors for success.

    Science.gov (United States)

    Haselkorn, Ateret; Rosenstein, Alan H; Rao, Anil K; Van Zuiden, Michele; Coye, Molly J

    2007-01-01

    The steady evolution of technology, with the associated increased costs, is a major factor affecting health care delivery. In the face of limited capital resources, it is important for hospitals to integrate technology management with the strategic plan, mission, and resource availability of the organization. Experiences in technology management have shown that having a well-organized, consistent approach to technology planning, assessment, committee membership, approval, evaluation, implementation, and monitoring are key factors necessary to ensure a successful program. We examined the results of a survey that assessed the structure, processes, and cultural support behind hospital committees for new technology planning and approval.

  3. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  4. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  5. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  6. Implementation of Capacity Planning Agent of Demand Responsive Planning Framework : Master’s Thesis in Production Engineering of The Royal Institute of Technology

    OpenAIRE

    Juhong, Nirut

    2013-01-01

    This master’s thesis is conducted as a conclusion of Master degree of Science in Production Engineering and Management at The Royal Institute of Technology. The focus of this thesis work is to implement a Capacity planning agent. Nowadays, companies need to adapt themselves to be as responsive to customers’ demand as possible. However, the responsiveness is usually limited by the fixed capacity of the production. Evolvable Production System (EPS), motivated by the limitation mentioned above, ...

  7. A Technology Plan for Enabling Commercial Space Business

    Science.gov (United States)

    Lyles, Garry M.

    1997-01-01

    The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems

  8. Assessment of emergency response planning and implementation in the aftermath of major natural disasters and technological accidents

    International Nuclear Information System (INIS)

    Milligan, Patricia A.; Jones, Joseph; Walton, F.; Smith, J.D.

    2008-01-01

    Emergency planning around nuclear power plants represents some of the most mature and well developed emergency planning in the United States. Since the implementation of NUREG-0654 / FEMA-REP-1, Rev. 1, A Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (NRC, 1980a) the licensees, local, and State agencies have developed detailed Radiological Emergency Response Programs. An important component of these plans is the evacuation of the population in the event of a general emergency condition at the plant. In January 2005, the U.S. Nuclear Regulatory Commission (NRC) published the landmark report, 'Identification and Analysis of Factors Affecting Emergency Evacuations' (NUREG/CR 6864/), which represented the most comprehensive investigation of public evacuations in the United States in more than 15 years. Since the completion of this research, several high profile evacuations have occurred, including Hurricane Katrina in New Orleans, Hurricane Rita in Houston, as well as major wildfires across the western U.S. The NRC commissioned an update to its 2005 evacuation case study publication to evaluate the evacuation experience of the selected communities (e.g., timeliness, related injuries, hazard avoidance); the level of preplanning that was in place for the affected areas and extent that the pre planned requirements were implemented during the emergency response; the critical factors contributing to the efficiency of or impediments to the evacuations (e.g., training, drills, preparedness, experience, resources, facilities, and organizational structure); and additional factors that may have contributed to less than satisfactory public response (i.e., availability of personal transportation, use of public transportation, lack of availability of shelters, etc.). The comprehensive report will be published in fall of 2008 as NUREG/CR-6981, Assessment of Emergency Response Planning and

  9. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... technology (RACT), contingency measures, a 2002 base- year emissions inventory and other planning SIP...

  10. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  11. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  12. Consider the Four-Legged Stool as You Plan for Information Technology.

    Science.gov (United States)

    Baltzer, Jan A.

    2000-01-01

    Discusses the need for strategic planning in libraries for the use of information technology that will add value to the library and better serve the users. Explains a model for developing information technology strategic plans that includes vision statements, goals and strategies, and an implementation timeline. (LRW)

  13. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  14. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  15. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  16. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  17. Fiscal years 1994--1998 Information Technology Strategic Plan

    International Nuclear Information System (INIS)

    1993-11-01

    A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM

  18. Effect of Organizational Culture Factors on Knowledge Management Processes Implementation in Technology & Deputy Tax Planning Agency

    Directory of Open Access Journals (Sweden)

    Hamid Rahimian

    2011-10-01

    Full Text Available This research was a case study to evaluate the effect of organizational culture on knowledge management processes implementation in Technology & Deputy Tax Planning Agency was done by Survey Method. Population of the study was experts in Technology & Deputy Tax planning of the organization. Research tools included two questionnaires: the organizational culture profile and the processes of knowledge management. The first questionnaire has surveyed the seven components of organizational culture (competitiveness, social responsibility, supportiveness, innovation, emphasis on rewards, performance orientation, and stability. The second has explored six processes such as creation, capture, organization, storage, dissemination and application of knowledge. The results of this research showed that according to the experts the components of organizational culture and knowledge management were in the intermediate level. Between each of the seven components of organizational culture was 70% positive and significant relationship with knowledge management processes. Also, among each of the seven components of organizational culture was positive and significant relationship with knowledge management processes. Regression analysis gave the same result that only two components of social responsibility and performance orientation in predicting the changing role of knowledge management processes have been effective.

  19. Information Technology Investment Strategy Planning: Balance Scorecard Approach

    Directory of Open Access Journals (Sweden)

    Henny Hendarti

    2011-05-01

    Full Text Available Purpose of this research are to prepare the IT investment strategy using Balanced Scorecard approach in the company where the appropriate planning of this IT investment strategy can maximize the competitive benefit in the company, and it also to recommended a strategy of IT investment that can be implemented and measure the rate of return from the IT investment in the company. Research Method used book studies, field studies, and analysis system. Book studies from the books and journal. Field studies done by observation, interview, and questioner, and analysis system done by analyzed the ongoing system in the company. The result from this analysis is a recommendation in investment IT such as sales module, payment module, and report module. Then for the conclusion, this information technology investment planning can be develop to another investment implementation such authorized website of the company and using PDA (Personal Digital AssistantIndex Terms - Planning, Information Technology, Investment, Balance Scorecard

  20. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  1. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  2. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  3. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    International Nuclear Information System (INIS)

    Streit, R.D.; Couture, S.A.

    1995-03-01

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ''demonstration technologies.'' Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria

  4. NASA Information Technology Implementation Plan

    Science.gov (United States)

    2000-01-01

    NASA's Information Technology (IT) resources and IT support continue to be a growing and integral part of all NASA missions. Furthermore, the growing IT support requirements are becoming more complex and diverse. The following are a few examples of the growing complexity and diversity of NASA's IT environment. NASA is conducting basic IT research in the Intelligent Synthesis Environment (ISE) and Intelligent Systems (IS) Initiatives. IT security, infrastructure protection, and privacy of data are requiring more and more management attention and an increasing share of the NASA IT budget. Outsourcing of IT support is becoming a key element of NASA's IT strategy as exemplified by Outsourcing Desktop Initiative for NASA (ODIN) and the outsourcing of NASA Integrated Services Network (NISN) support. Finally, technology refresh is helping to provide improved support at lower cost. Recently the NASA Automated Data Processing (ADP) Consolidation Center (NACC) upgraded its bipolar technology computer systems with Complementary Metal Oxide Semiconductor (CMOS) technology systems. This NACC upgrade substantially reduced the hardware maintenance and software licensing costs, significantly increased system speed and capacity, and reduced customer processing costs by 11 percent.

  5. Open modular architecture controls at GM Powertrain: technology and implementation

    Science.gov (United States)

    Bailo, Clark P.; Yen, C. J.

    1997-01-01

    General Motors Powertrain Group (GMPTG) has been the leader in implementing open, modular architecture controller (OMAC) technologies in its manufacturing applications since 1986. The interest in OMAC has been greatly expanded for the past two years because of the advancement of personal computer technologies and the publishing of the OMAC whitepaper by the US automotive companies stating the requirements of OMAC technologies in automotive applications. The purpose of this paper is to describe the current OMAC projects and the future direction of implementation at GMPTG. An overview of the OMAC project and the definition of the OMAC concept are described first. The rationale of pursuing open technologies is explained from the perspective of GMPTG in lieu of its agile manufacturing strategy. Examples of existing PC-based control applications are listed to demonstrate the extensive commitment to PC-based technologies that has already been put in place. A migration plan form PC-based to OMAC-based systems with the thorough approach of validation are presented next to convey the direction that GMPTG is taking in implementing OMAC technologies. Leveraged technology development projects are described to illustrate the philosophy and approaches toward the development of OMAC technologies at GMPTG. Finally, certain implementation issues are discussed to emphasize efforts that are still required to have successful implementations of OMAC systems.

  6. Decision support software technology demonstration plan

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN,T.; ARMSTRONG,A.

    1998-09-01

    The performance evaluation of innovative and alternative environmental technologies is an integral part of the US Environmental Protection Agency's (EPA) mission. Early efforts focused on evaluating technologies that supported the implementation of the Clean Air and Clean Water Acts. In 1986 the Agency began to demonstrate and evaluate the cost and performance of remediation and monitoring technologies under the Superfund Innovative Technology Evaluation (SITE) program (in response to the mandate in the Superfund Amendments and Reauthorization Act of 1986 (SARA)). In 1990, the US Technology Policy was announced. This policy placed a renewed emphasis on making the best use of technology in achieving the national goals of improved quality of life for all Americans, continued economic growth, and national security. In the spirit of the technology policy, the Agency began to direct a portion of its resources toward the promotion, recognition, acceptance, and use of US-developed innovative environmental technologies both domestically and abroad. Decision Support Software (DSS) packages integrate environmental data and simulation models into a framework for making site characterization, monitoring, and cleanup decisions. To limit the scope which will be addressed in this demonstration, three endpoints have been selected for evaluation: Visualization; Sample Optimization; and Cost/Benefit Analysis. Five topics are covered in this report: the objectives of the demonstration; the elements of the demonstration plan; an overview of the Site Characterization and Monitoring Technology Pilot; an overview of the technology verification process; and the purpose of this demonstration plan.

  7. Smart meter implementation plan : report of the Board to the Minister

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  8. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Richard H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rader, Jordan D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

  9. 76 FR 42612 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Reasonably Available...

    Science.gov (United States)

    2011-07-19

    ... and Promulgation of Air Quality Implementation Plans; Vermont; Reasonably Available Control Technology... a demonstration that VT meets the requirements of reasonably available control technology (RACT) for... regulation; and new requirements for wood furniture manufacturing operations. Additionally, EPA is proposing...

  10. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    maintenance and enhancement. Contracting of development of the Handbook website is discussed in terms of host server options, cost, technology, developer background and cooperative nature, and company stability. One of the first and most important activities in website development will be the generation of a detailed Handbook product requirements document including case diagrams and functional requirements tables. The Implementation Plan provides a detailed overview of the organizational structure of the Handbook and details of Handbook preparation, publication, and distribution. Finally, the Implementation Plan defines Quality Assurance requirements for the Handbook

  11. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  12. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  13. Comparative analysis of elements and models of implementation in local-level spatial plans in Serbia

    Directory of Open Access Journals (Sweden)

    Stefanović Nebojša

    2017-01-01

    Full Text Available Implementation of local-level spatial plans is of paramount importance to the development of the local community. This paper aims to demonstrate the importance of and offer further directions for research into the implementation of spatial plans by presenting the results of a study on models of implementation. The paper describes the basic theoretical postulates of a model for implementing spatial plans. A comparative analysis of the application of elements and models of implementation of plans in practice was conducted based on the spatial plans for the local municipalities of Arilje, Lazarevac and Sremska Mitrovica. The analysis includes four models of implementation: the strategy and policy of spatial development; spatial protection; the implementation of planning solutions of a technical nature; and the implementation of rules of use, arrangement and construction of spaces. The main results of the analysis are presented and used to give recommendations for improving the elements and models of implementation. Final deliberations show that models of implementation are generally used in practice and combined in spatial plans. Based on the analysis of how models of implementation are applied in practice, a general conclusion concerning the complex character of the local level of planning is presented and elaborated. [Project of the Serbian Ministry of Education, Science and Technological Development, Grant no. TR 36035: Spatial, Environmental, Energy and Social Aspects of Developing Settlements and Climate Change - Mutual Impacts and Grant no. III 47014: The Role and Implementation of the National Spatial Plan and Regional Development Documents in Renewal of Strategic Research, Thinking and Governance in Serbia

  14. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  15. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  16. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Waste-to-energy technologies and project implementation

    CERN Document Server

    Rogoff, Marc J

    2011-01-01

    This book covers in detail programs and technologies for converting traditionally landfilled solid wastes into energy through waste-to-energy projects. Modern Waste-to-Energy plants are being built around the world to reduce the levels of solid waste going into landfill sites and contribute to renewable energy and carbon reduction targets. The latest technologies have also reduced the pollution levels seen from early waste incineration plants by over 99 per cent. With case studies from around the world, Rogoff and Screve provide an insight into the different approaches taken to the planning and implementation of WTE. The second edition includes coverage of the latest technologies and practical engineering challenges as well as an exploration of the economic and regulatory context for the development of WTE.

  19. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  20. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  1. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  3. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    Science.gov (United States)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  4. Use of Mobile Information Technology during Planning, Implementation and Evaluation of a Polio Campaign in South Sudan.

    Science.gov (United States)

    Haskew, John; Kenyi, Veronica; William, Juma; Alum, Rebecca; Puri, Anu; Mostafa, Yehia; Davis, Robert

    2015-01-01

    Use of mobile information technology may aid collection of real-time, standardised data to inform and improve decision-making for polio programming and response. We utilised Android-based smartphones to collect data electronically from more than 8,000 households during a national round of polio immunisation in South Sudan. The results of the household surveys are presented here, together with discussion of the application of mobile information technology for polio campaign planning, implementation and evaluation in a real-time setting. Electronic questionnaires were programmed onto Android-based smartphones for mapping, supervision and survey activities during a national round of polio immunisation. National census data were used to determine the sampling frame for each activity and select the payam (district). Individual supervisors, in consultation with the local district health team, selected villages and households within each payam. Data visualisation tools were utilised for analysis and reporting. Implementation of mobile information technology and local management was feasible during a national round of polio immunisation in South Sudan. Red Cross visits during the polio campaign were equitable according to household wealth index and households who received a Red Cross visit had significantly higher odds of being aware of the polio campaign than those who did not. Nearly 95% of children under five were reported to have received polio immunisation (according to maternal recall) during the immunisation round, which varied by state, county and payam. A total of 11 payams surveyed were identified with less than 90% reported immunisation coverage and the least poor households had significantly higher odds of being vaccinated than the most poor. More than 95% of households were aware of the immunisation round and households had significantly higher odds of being vaccinated if they had prior awareness of the campaign taking place. Pre-campaign community education

  5. Use of Mobile Information Technology during Planning, Implementation and Evaluation of a Polio Campaign in South Sudan.

    Directory of Open Access Journals (Sweden)

    John Haskew

    Full Text Available Use of mobile information technology may aid collection of real-time, standardised data to inform and improve decision-making for polio programming and response. We utilised Android-based smartphones to collect data electronically from more than 8,000 households during a national round of polio immunisation in South Sudan. The results of the household surveys are presented here, together with discussion of the application of mobile information technology for polio campaign planning, implementation and evaluation in a real-time setting.Electronic questionnaires were programmed onto Android-based smartphones for mapping, supervision and survey activities during a national round of polio immunisation. National census data were used to determine the sampling frame for each activity and select the payam (district. Individual supervisors, in consultation with the local district health team, selected villages and households within each payam. Data visualisation tools were utilised for analysis and reporting.Implementation of mobile information technology and local management was feasible during a national round of polio immunisation in South Sudan. Red Cross visits during the polio campaign were equitable according to household wealth index and households who received a Red Cross visit had significantly higher odds of being aware of the polio campaign than those who did not. Nearly 95% of children under five were reported to have received polio immunisation (according to maternal recall during the immunisation round, which varied by state, county and payam. A total of 11 payams surveyed were identified with less than 90% reported immunisation coverage and the least poor households had significantly higher odds of being vaccinated than the most poor. More than 95% of households were aware of the immunisation round and households had significantly higher odds of being vaccinated if they had prior awareness of the campaign taking place

  6. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  7. Exploring the Effects of Technology Overload on the Outcomes of Enterprise Resource Planning (ERP) Implementation Projects

    Science.gov (United States)

    Kates, Earl B.

    2016-01-01

    Despite significant investments made by organizations to implement ERP systems and prior research that explored contributing factors of ERP failure, the ERP implementation success rate continues to remain low in practice. Increased technology usage in the workplace coupled with higher dependency on technology to complete project tasks often leads…

  8. 42 CFR 495.332 - State Medicaid health information technology (HIT) plan requirements.

    Science.gov (United States)

    2010-10-01

    ... and strategic plan for the next 5 years. (2) A description of how the State Medicaid HIT plan will be... processes that enable improved program administration for the Medicaid enterprise; (ii) Includes business... used certified EHR technology during the EHR reporting period, and that they have adopted, implemented...

  9. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  10. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  11. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  12. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  13. Technology Implementation Plan. Fully Ceramic Microencapsulated Fuel for Commercial Light Water Reactor Application

    International Nuclear Information System (INIS)

    Snead, Lance Lewis; Terrani, Kurt A.; Powers, Jeffrey J.; Worrall, Andrew; Robb, Kevin R.; Snead, Mary A.

    2015-01-01

    This report is an overview of the implementation plan for ORNL's fully ceramic microencapsulated (FCM) light water reactor fuel. The fully ceramic microencapsulated fuel consists of tristructural isotropic (TRISO) particles embedded inside a fully dense SiC matrix and is intended for utilization in commercial light water reactor application.

  14. Technology Implementation Plan. Fully Ceramic Microencapsulated Fuel for Commercial Light Water Reactor Application

    Energy Technology Data Exchange (ETDEWEB)

    Snead, Lance Lewis [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Powers, Jeffrey J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Worrall, Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Robb, Kevin R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Snead, Mary A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-04-01

    This report is an overview of the implementation plan for ORNL's fully ceramic microencapsulated (FCM) light water reactor fuel. The fully ceramic microencapsulated fuel consists of tristructural isotropic (TRISO) particles embedded inside a fully dense SiC matrix and is intended for utilization in commercial light water reactor application.

  15. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  16. Opportunity costs of implementing forest plans

    Science.gov (United States)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  17. NASA Technology Plan 1998

    Science.gov (United States)

    1998-01-01

    This NASA Strategic Plan describes an ambitious, exciting vision for the Agency across all its Strategic Enterprises that addresses a series of fundamental questions of science and research. This vision is so challenging that it literally depends on the success of an aggressive, cutting-edge advanced technology development program. The objective of this plan is to describe the NASA-wide technology program in a manner that provides not only the content of ongoing and planned activities, but also the rationale and justification for these activities in the context of NASA's future needs. The scope of this plan is Agencywide, and it includes technology investments to support all major space and aeronautics program areas, but particular emphasis is placed on longer term strategic technology efforts that will have broad impact across the spectrum of NASA activities and perhaps beyond. Our goal is to broaden the understanding of NASA technology programs and to encourage greater participation from outside the Agency. By relating technology goals to anticipated mission needs, we hope to stimulate additional innovative approaches to technology challenges and promote more cooperative programs with partners outside NASA who share common goals. We also believe that this will increase the transfer of NASA-sponsored technology into nonaerospace applications, resulting in an even greater return on the investment in NASA.

  18. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  19. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  20. DEVELOPMENT OF INFORMATION TECHNOLOGY STRATEGIC PLANNING FOR MANUFACTURING INDUSTRY (CASE STUDY: PT MCM

    Directory of Open Access Journals (Sweden)

    Leonardus Hardjo

    2013-10-01

    Full Text Available IT Department in PT MCM has to carry out the duties and functions of developing solution to support the business unit in their operation and gain some benefits which should be obtained by using IT in manufacturing such as increasing efficiency, improving the effectivity in making decision and helping to promote the products. This study aims to design information technology strategic planning in accordance with the strategic plan. The research method is using the IT Strategic Planning framework of Alex Cullen and Marc Cecere. This study uses SWOT and IT Balanced Scorecard to analyze the needs of IT at PT MCM. The results of this study are recommended strategic steps to optimize the implementation of IT in the company to improve the performance from IT division to obtain the benefits by implementing IT in manufacturing and to form IT Blueprint, which is part of the information technology strategic plan in PT MCM.

  1. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  2. Local niche planning and its strategic implications for implementation of energy-efficient technology

    DEFF Research Database (Denmark)

    Quitzau, Maj-Britt; Hoffmann, Birgitte; Elle, Morten

    2012-01-01

    -management process for enabling transitions. The study outlines the proactive spatial planning of a Danish local authority in order to illustrate how the strategic work performed in this kind of local development project represents a special form of niche management that is able to create room for innovation...... such a gap between policy visions and their implementation in practice specific forms of strategic work is needed, according to new transformative ideas in spatial planning. The aim of this paper is to characterize the transformative capacities of this kind of strategic work at the spatial scale of the town...... in order to assess how such activities engage with sustainable transitions. The theoretical contribution of the paper is to compare strategic work performed in transformative forms of spatial planning with the strategic work intended in strategic niche management, which represent a change...

  3. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  4. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  5. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    Science.gov (United States)

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  6. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  7. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  8. 75 FR 81555 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Allegheny County's...

    Science.gov (United States)

    2010-12-28

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Allegheny County's Adoption of Control... amendments to the Allegheny County Health Department (ACHD) Rules and Regulations, Article XXI, Air Pollution Control, and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources...

  9. Organizational Factors that Affect the Implementation of Information Technology: Perspectives of Middle Managers in Iran.

    Science.gov (United States)

    Barzekar, Hosein; Karami, Mahtab

    2014-10-01

    to examine the organizational factors affecting the application of information technology in hospitals. Since the organizational factors are one of the most important determinants of successful projects, by understanding their impact and identifying them it can help planning a systematic IT implementation. In this cross-sectional descriptive study 110 middle managers were chosen from teaching hospitals. Structured questionnaire was used for the data collection. There was a significant relationship between organization resource, organizational knowledge, process, management structure and values and goals with implementation of information technology. Findings showed that organizational factors had a considerable impact on implementation of information technology. Top managers must consider the important aspects of effective organizational factors.

  10. The implementation of AI technologies in computer wargames

    Science.gov (United States)

    Tiller, John A.

    2004-08-01

    Computer wargames involve the most in-depth analysis of general game theory. The enumerated turns of a game like chess are dwarfed by the exponentially larger possibilities of even a simple computer wargame. Implementing challenging AI is computer wargames is an important goal in both the commercial and military environments. In the commercial marketplace, customers demand a challenging AI opponent when they play a computer wargame and are frustrated by a lack of competence on the part of the AI. In the military environment, challenging AI opponents are important for several reasons. A challenging AI opponent will force the military professional to avoid routine or set-piece approaches to situations and cause them to think much deeper about military situations before taking action. A good AI opponent would also include national characteristics of the opponent being simulated, thus providing the military professional with even more of a challenge in planning and approach. Implementing current AI technologies in computer wargames is a technological challenge. The goal is to join the needs of AI in computer wargames with the solutions of current AI technologies. This talk will address several of those issues, possible solutions, and currently unsolved problems.

  11. REGULATORY FUNDAMENTALS FOR IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS IN INDUSTRY

    Directory of Open Access Journals (Sweden)

    L. V. Gubich

    2016-01-01

    Full Text Available The article provides an overview of the existing regulatory basis for the development of IIST. The features of IT projects management and a brief description of methodological recommendations on implementation of IT projects of the State scientific and technical Program «Electronic enterprise resource planning (CALS-ERP-technology» for 2011–2015 are considered.

  12. Technology Planning Strategies

    Science.gov (United States)

    Decker, Kathy

    2004-01-01

    Effective planning strategies drive achievement of an overall technology goal to increase access to electronic information in real time in order to increase efficiency, productivity, and communication across campus. Planning relies on providing access, 'Anytime Anywhere' to student information, calendar, email, course management tools, and the…

  13. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  14. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  15. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  16. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  17. Implementing recovery: an analysis of the key technologies in Scotland

    Science.gov (United States)

    2011-01-01

    Background Over the past ten years the promotion of recovery has become a stated aim of mental health policies within a number of English speaking countries, including Scotland. Implementation of a recovery approach involves a significant reorientation of mental health services and practices, which often poses significant challenges for reformers. This article examines how four key technologies of recovery have assisted in the move towards the creation of a recovery-oriented mental health system in Scotland. Methods Drawing on documentary analysis and a series of interviews we examine the construction and implementation of four key recovery 'technologies' as they have been put to use in Scotland: recovery narratives, the Scottish Recovery Indicator (SRI), Wellness Recovery Action Planning (WRAP) and peer support. Results Our findings illuminate how each of these technologies works to instantiate, exemplify and disseminate a 'recovery orientation' at different sites within the mental health system in order to bring about a 'recovery oriented' mental health system. They also enable us to identify some of the factors that facilitate or hinder the effectiveness of those technologies in bringing about a change in how mental health services are delivered in Scotland. These finding provide a basis for some general reflections on the utility of 'recovery technologies' to implement a shift towards recovery in mental health services in Scotland and elsewhere. Conclusions Our analysis of this process within the Scottish context will be valuable for policy makers and service coordinators wishing to implement recovery values within their own national mental health systems. PMID:21569633

  18. Implementing recovery: an analysis of the key technologies in Scotland

    Directory of Open Access Journals (Sweden)

    Sturdy Steve

    2011-05-01

    Full Text Available Abstract Background Over the past ten years the promotion of recovery has become a stated aim of mental health policies within a number of English speaking countries, including Scotland. Implementation of a recovery approach involves a significant reorientation of mental health services and practices, which often poses significant challenges for reformers. This article examines how four key technologies of recovery have assisted in the move towards the creation of a recovery-oriented mental health system in Scotland. Methods Drawing on documentary analysis and a series of interviews we examine the construction and implementation of four key recovery 'technologies' as they have been put to use in Scotland: recovery narratives, the Scottish Recovery Indicator (SRI, Wellness Recovery Action Planning (WRAP and peer support. Results Our findings illuminate how each of these technologies works to instantiate, exemplify and disseminate a 'recovery orientation' at different sites within the mental health system in order to bring about a 'recovery oriented' mental health system. They also enable us to identify some of the factors that facilitate or hinder the effectiveness of those technologies in bringing about a change in how mental health services are delivered in Scotland. These finding provide a basis for some general reflections on the utility of 'recovery technologies' to implement a shift towards recovery in mental health services in Scotland and elsewhere. Conclusions Our analysis of this process within the Scottish context will be valuable for policy makers and service coordinators wishing to implement recovery values within their own national mental health systems.

  19. INTEGRATION OF ECONOMIC AND COMPUTER SKILLS AT IMPLEMENTATION OF STUDENTS PROJECT «BUSINESS PLAN PRODUCING IN MICROSOFT WORD»

    Directory of Open Access Journals (Sweden)

    Y.B. Samchinska

    2012-07-01

    Full Text Available In the article expedience at implementation of economic specialities by complex students project on Informatics and Computer Sciences is grounded on creation of business plan by modern information technologies, and also methodical recommendations are presented on implementation of this project.

  20. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  1. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  2. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  3. Implementation digital technologies in nuclear utilities

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, C.; Maselli, A.J., E-mail: Tony.Maselli@Invensys.com [Invensys Operations Management, London (United Kingdom)

    2012-07-01

    The introduction of digital technologies into the nuclear industry has assisted in many ways and made many of the Life Extensions and Uprates a possibility. But with this introduction of digital technologies comes some potentially challenging issues which need to be addressed for ultimate project success. This presentation discusses what a nuclear utility should consider and establish when implementing digital technologies in their plant. Digital technologies have been employed in many safety critical industries such as Aerospace, Pharmaceutical, Oil and Gas, and Chemical. However, nuclear industry implementation of digital technologies has been slow and in many ways tenuous. There are even documented operating experience events in which plant trips/SCRAMs occurred during a digital system implementation. This presentation aims to prevent those issues drawing upon the lessons learned over the past 5 years. Considerations include general challenges to overcome when implementing Digital Technologies, how to justify and execute projects, evaluation of resource knowledge, and the new challenges of Cyber Security. (author)

  4. Implementation digital technologies in nuclear utilities

    International Nuclear Information System (INIS)

    Wiegand, C.; Maselli, A.J.

    2012-01-01

    The introduction of digital technologies into the nuclear industry has assisted in many ways and made many of the Life Extensions and Uprates a possibility. But with this introduction of digital technologies comes some potentially challenging issues which need to be addressed for ultimate project success. This presentation discusses what a nuclear utility should consider and establish when implementing digital technologies in their plant. Digital technologies have been employed in many safety critical industries such as Aerospace, Pharmaceutical, Oil and Gas, and Chemical. However, nuclear industry implementation of digital technologies has been slow and in many ways tenuous. There are even documented operating experience events in which plant trips/SCRAMs occurred during a digital system implementation. This presentation aims to prevent those issues drawing upon the lessons learned over the past 5 years. Considerations include general challenges to overcome when implementing Digital Technologies, how to justify and execute projects, evaluation of resource knowledge, and the new challenges of Cyber Security. (author)

  5. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  6. DEVELOPMENT OF INFORMATION SYSTEM STRATEGIES AND INFORMATION TECHNOLOGY AT PRIVATE UNIVERSITIES IN PRINGSEWU BY USING METHODOLOGY ENTERPRISE ARCHITECTURE PLANNING (EAP

    Directory of Open Access Journals (Sweden)

    Ahmad Khumaidi

    2017-08-01

    Full Text Available The development of information systems and information technology requires planning to complement the direction of the college strategy. Planning is constructed by defining data, application and technology architectures in the use of information to support business processes and then architectural design to identify needs and create architectural schemes and make plans for their implementation. Enterprise Architecture Planning (EAP is a method of data quality planning approach oriented to business needs and how the implementation of the architecture is done in such a way in an effort to support business turnover and achievement of Vision and Mission and the goal of strategic development of SI and IT at college private high. The result of this research is to get the blueprint resulting from Enterprise Architecture Planning (EAP methodology which will be used as a guide for making blueprint in the form of data architecture, application architecture and technology architecture in strategy development Information system and information technology as a whole on High private sector especially in Pringsewu

  7. Rotec Theory: planning tool to position hospitals on the technology curve.

    Science.gov (United States)

    Roberts, R

    1990-06-01

    The mission statement of a prominent California hospital has been revised as part of a strategic planning process less than two years before the hospital began experiencing substantial financial difficulties. When the "red numbers" began to appear, management was quick to blame changing demographic patterns and the competitive environment. Those were not the only problems. A major contributing factor that management failed to recognize was a delay in how quickly the hospital moved to adopt high technology or new medical procedures. In a few short years, it had changed from being the first community hospital to implement state-of-the-art programs to one that was slow to introduce technology. In retrospect, the hospital's mission statement did not address the role of technology and therefore it could not detect the movement away from one of its critical success factors. The Rotec Theory was developed to assist this hospital to understand the economics of technology on its current and planned operations.

  8. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  9. CSSP implementation plan for space plasma physics programs

    International Nuclear Information System (INIS)

    Baker, D.N.; Williams, D.J.; Johns Hopkins Univ., Laurel, MD)

    1985-01-01

    The Committee on Solar and Space Physics (CSSP) has provided NASA with guidance in the areas of solar, heliospheric, magnetospheric, and upper atmospheric research. The budgetary sitation confronted by NASA has called for a prioritized plane for the implementation of solar and space plasma physics programs. CSSP has developed the following recommendations: (1) continue implementation of both the Upper Atmosphere Research Satellite and Solar Optical Telescope programs; (2) initiate the International Solar Terrestrial Physics program; (3) plan for later major free-flying missions and carry out the technology development they require; (4) launch an average of one solar and space physics Explorer per yr beginning in 1990; (5) enhance current Shuttle/Spacelab programs; (6) develop facility-class instrumentation; (7) augment the solar terrestrial theory program by FY 1990; (8) support a compute modeling program; (9) strengthen the research and analysis program; and (10) maintain a stable suborbital program for flexible science objectives in upper atmosphere and space plasma physics

  10. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  11. 76 FR 51922 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Plastic...

    Science.gov (United States)

    2011-08-19

    ... Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those... Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Plastic Parts and Business Machines..., Plastic Parts and Business Machines Coating. Maryland's SIP revision meets the requirement to adopt...

  12. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  13. CONTRIBUTIONS TO THE IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT SYSTEM WITHIN THE ECO TECHNOLOGIC ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Gheorghe AMZA

    2012-05-01

    Full Text Available This paper presents contributions to the implementation of environmental management system within the eco technologic organization. SME type organization's environmental policies highlights the accomplishment of requirements of ISO 19001 standard, regarding pollution prevention, commitment in accordance to the law and if it is documented and can provide a framework for setting environmental objectives and targets. The audit may reveal whether it corresponds to the nature, scale and impact that activities, products and services of the organization have on the environment, or if it is implemented, maintained and communicated to all staff. This paper presents mainly the following: elements of environmental planning process, environmental planning process, place of environmental conservation in the general strategy of the organization

  14. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  15. Technology Development: From Idea to Implementation - 12131

    Energy Technology Data Exchange (ETDEWEB)

    Spires, Renee H. [Savannah River Remediation (United States)

    2012-07-01

    There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be

  16. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  17. Forward-Looking Planning of Technology Development

    Directory of Open Access Journals (Sweden)

    Katarzyna Halicka

    2015-12-01

    Full Text Available The main aim of this article is to adapt the Future-Oriented Technology Analysis (FTA to prospective planning of technology development. Firstly, the article presents the assumptions, methods and idea, as well as the concept of the FTA method. Moreover, selected publications on the use of this method were analysed. Then, an original, base model of forward-looking planning of technology development was constructed and presented. The end result of this process will be the development of the localized in time, presented in graphic form, action plan referred to as the route of technology development. Basing on the literature review and the research projects a preliminary route of development of arbitrarily chosen technology was also built and presented.

  18. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  19. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    OpenAIRE

    Ionica Oncioiu

    2014-01-01

    This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitiv...

  20. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  1. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  2. Planning of the development of the MMIS core technology based on nuclear-IT convergence

    International Nuclear Information System (INIS)

    Kwon, Kee Choon; Kim, Chang Hwoi; Hwang, In Koo

    2012-01-01

    - Drive nuclear-IT convergence technologies such as middleware applied new concept nuclear instrumentation and control architecture, automated operation of future nuclear power plant, virtual reality/augmented reality, design and verification technology of a nuclear power plant main control room, software dependability, and cyber security technology - Write state-of-the-art report for the nuclear instrumentation and control based on IT convergence - A prototype which implemented related equipment and software subject to nuclear reactor operator that reside in the main control room (Reactor Operator, RO) order to a on-site operator (Local Operator, LO) and confirm the task performance matches the RO's intention - 'IT Convergence intelligent instrumentation and control technology' project planning for the Fourth Nuclear Power Research and Development in the long-term plan

  3. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  4. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  5. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-08-23

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  6. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  7. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  8. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  9. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  10. Dosimetry challenges for implementing emerging technologies

    Energy Technology Data Exchange (ETDEWEB)

    Yin Fangfang; Oldham, Mark; Cai Jing; Wu Qiuwen, E-mail: Fangfang.yin@duke.ed [Department of Radiation Oncology Duke University Medical Center, Durham, NC 27516 (United States)

    2010-11-01

    During the last 10 years, radiation therapy technologies have gone through major changes, mainly related introduction of sophisticated delivery and imaging techniques to improve the target localization accuracy and dose conformity. While implementation of these emerging technologies such as image-guided SRS/SBRT, IMRT/IMAT, IGRT, 4D motion management, and special delivery technologies showed substantial clinical gains for patient care, many other factors, such as training/quality, efficiency/efficacy, and cost/effectiveness etc. remain to be challenging. This talk will address technical challenges for dosimetry verification of implementing these emerging technologies in radiation therapy.

  11. Planning of the development of the MMIS core technology based on nuclear-IT convergence

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Kee Choon; Kim, Chang Hwoi; Hwang, In Koo [KAERI, Daejeon (Korea, Republic of); and others

    2012-01-15

    - Drive nuclear-IT convergence technologies such as middleware applied new concept nuclear instrumentation and control architecture, automated operation of future nuclear power plant, virtual reality/augmented reality, design and verification technology of a nuclear power plant main control room, software dependability, and cyber security technology - Write state-of-the-art report for the nuclear instrumentation and control based on IT convergence - A prototype which implemented related equipment and software subject to nuclear reactor operator that reside in the main control room (Reactor Operator, RO) order to a on-site operator (Local Operator, LO) and confirm the task performance matches the RO's intention - 'IT Convergence intelligent instrumentation and control technology' project planning for the Fourth Nuclear Power Research and Development in the long-term plan.

  12. Planning for Integrating Teaching Technologies

    Directory of Open Access Journals (Sweden)

    Mandie Aaron

    2004-06-01

    Full Text Available Teaching technologies offer pedagogical advantages which vary with specific contexts. Successfully integrating them hinges on clearly identifying pedagogical goals, then planning for the many decisions that technological change demands. In examining different ways of organizing this process, we have applied planning tools from other domains - Fault Tree Analysis and Capability Maturity Modeling- at the school and college levels. In another approach, we have examined attempts to broadly model the integration process at the university level. Our studies demonstrate that the use of a variety of tools and techniques can render the integration of teaching technologies more systematic.

  13. Critical Success Factors for the Implementation of PeopleSoft Enterprise Resource Planning in a Public Organization

    Science.gov (United States)

    Mukkamala, Hemanth K.

    2013-01-01

    Organizations of different sizes are changing their information technology (IT) strategies in order to achieve efficiency and effectiveness in today's global economy and to integrate their internal and external information by implementing PeopleSoft Enterprise Resource Planning (ERP) systems. The literature has case studies of successful and…

  14. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    International Nuclear Information System (INIS)

    Moe, Wayne Leland

    2015-01-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a ''critical path'' for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain ''minimum'' levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial ''first step'' in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by

  15. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  16. Defense Technology Plan

    Science.gov (United States)

    1994-09-01

    implementation of the services necessary to support transparent "information pull " operation of decision support systems. This infrastructure will be implemented...technology. Some aspects of this area such as user- pull , mobile and highly distributed operation, bandwidth needs and degree of securihy are Dol)-driven...by a variety of statutory requirements. R&D will provide enhanced mission effectiveness and maintenance of fragile ecosystems. The goalis to develop

  17. Exploration Technology Program plans and directions

    Science.gov (United States)

    Aldrich, A.; Rosen, R.; Craig, M.; Mankins, J. C.

    During the first part of the next century, the United States will return to the Moon to create a permanent lunar base, and, before the year 2019, we will send a human mission to Mars. In addition to these human operations, the Space Exploration Initiative will integrally incorporate robotic lunar and Mars missions. In achieving these efforts to expand human presence and activity in space and also exerted and frontiers of human knowledge, the SEI will require an array of new technologies. Mission architecture definition is still underway, but previous studies indicate that the SEI will require developments in areas such as advanced engines for space transportation, in-space assembly and construction to support permanent basing of exploration systems in space, and advanced surface operations capabilities including adequate levels of power and surface roving vehicles, and technologies to support safely long-duration human operations in space. Plans are now being put into place to implement an Exploration Technology Program (ETP) which will develop the major technologies needed for SEI. In close coordination with other ongoing U.S. government research and development efforts, the ETP will provide in the near term clear demonstrations of potential exploration technologies, research results to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. In addition to the technology needed for the first round of SEI missions, the ETP will also put in place a foundation of research for longer-term technology needs—ultimately leading the human missions to Mars. The Space Exploration Initiative and the Exploration Technology Program will challenge the best and the brightest minds across government, industry and academia, inspiring students of all ages and making possible future terrestial applications of SEI technologies that may create whole new industries for the future.

  18. Computer aided process planning system based on workflow technology and integrated bill of material tree

    Institute of Scientific and Technical Information of China (English)

    LU Chun-guang; MENG Li-li

    2006-01-01

    It is extremely important for procedure of process design and management of process data for product life cycle in Computer Aided Process Planning (CAPP) system,but there are many shortcomings with traditional CAPP system in these respects.To solve these questions,application of workflow technology in CAPP system based on web-integrated Bill of Material (BOM) tree is discussed,and a concept of integrated BOM tree was brought forward.Taking integrated BOM as the thread,CAPP systematic technological process is analyzed.The function,system architecture,and implementation mechanism of CAPP system based on Browser/Server and Customer/Server model are expatiated.Based on it,the key technologies of workflow management device were analyzed.Eventually,the implementation mechanism of integrated BOM tree was analyzed from viewpoints of material information encoding,organization node design of integrated BOM tree,transformation from Engineering BOM (EBOM)to Process BOM (PBOM),and the programming implementation technology.

  19. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  20. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  1. Research and development plan of fusion technologies in JAERI toward DEMO reactors

    International Nuclear Information System (INIS)

    Nishitani, Takeo; Hayashi, Takumi; Abe, Tetsuya; Akiba, Masato; Isono, Takaaki; Inoue, Takashi; Enoeda, Mikio; Okuno, Kiyoshi; Koizumi, Norikiyo; Sakamoto, Keishi; Sato, Satoshi; Jitsukawa, Shiro; Sugimoto, Masayoshi; Suzuki, Satoshi; Seki, Shogo; Takatsu, Hideyuki; Tanzawa, Sadamitsu; Tsuchiya, Kunihiko; Nishi, Masataka; Hayashi, Kimio; Matsui, Hideki; Yamanishi, Toshihiko; Watanabe, Kazuhiro

    2005-03-01

    In accordance with the 'Third Phase Basic Program on Fusion Research and Development' established by the Fusion Council of the Japan Atomic Energy Commission, research and development (R and D) of fusion technologies aim at realization of two elements: development of ITER key components and their improvement for higher performances; and construction of sound technical basis of fusion nuclear technologies essential for fusion energy utilization. JAERI has been assigned in the Third Phase Basic Program as a responsible institute for developing the above two elements, and accordingly has been implementing technology R and Ds categorized in the following three areas: R and D for ITER construction and operation; R and D for ITER utilization (blanket testing in ITER) and toward DEMO; and R and D on basic fusion technologies. The present report reviews the status and the plan of fusion technology R and Ds in the latter two areas, and presents the technical objectives, technical issues, status of R and D and near-term R and D plans for: breeding blankets; structural materials; the IFMIF program; improvements of the key ITER components for higher performances toward DEMO; and basic fusion technologies. (author)

  2. Technology transfer in the CNEA: Between 'supply-slide' and nuclear plan

    International Nuclear Information System (INIS)

    Enriquez, Santiago N

    2012-01-01

    This paper reflects on linkage activities and technology transfer of Atomic Energy National Commission (CNEA). Given that the CNEA was a S and T institution, which was pioneer in activities to reach out the productive sector; it will show that, since 1961, the year of the creation of the Service of Technical Assistance to Industry (SATI) -; until today -where the Law 23.877 of Promotion of the Technological Innovation is fully implemented, different modes of technology transfer based on certain S and T policies are detected. First, it will describe the characteristics of the technology transfer made by SATI, and its connection with the political decisions made by the Department of Metallurgy of CNEA to relate the domestic industry and the Nuclear Plan. In a second instance, it will describe the effects on the technology transfer after the disabling of the Nuclear Plan in 1994, the enforcement of Law 23,877 in CNEA and progressive deactivation of SATI. Finally, it will reflect on the two main stages of technology transfer in CNEA for potential S and T policies (author)

  3. Technology for Democracy in Smart City Planning

    Directory of Open Access Journals (Sweden)

    Paolo De Pascali

    2014-02-01

    Full Text Available In recent history the relationship between technology and urban planning has been variously taken into account (and possibly also undervalued, but lately it has come into focus with the maturation ofthe concept of the Smart City. Building on an analysis of documents dealing with the issue andcurrent experiences, this paper tries to determine which opportunity factors the new technologies are offering for the improvement of urban planning. In particular it considers how these technologies arebeing integrated into the processes of participatory planning thus supporting the development of direct democracy. The resulting complex framework suggests four main fields of application where the new technologies can contribute to addressing contents and governance of the plan for an urban organisation that enhances virtuous behaviours and steers the town’s residents towardsadopting them.

  4. Designing and Implementing Performance Technology for Teachers

    Directory of Open Access Journals (Sweden)

    Joi L. Moore

    2004-06-01

    Full Text Available This paper synthesizes research findings from a performance analysis of teacher tasks and the implementation of performance technology. These findings are aligned with design and implementation theories to provide understanding of the complex factors and events that occur during the implementation process. The article describes the necessary elements and conditions for designing and implementing performance tools in school environments that will encourage usage, efficient performance, and positive attitudes. Two models provide a visual representation of causal relationships between the implementation factors and the technology user. Although the implementation process can become complex because of the simultaneous events and phases, it can be properly managed through good communication and strategic involvement of teachers during the design and development process. The models may be able to assist technology designers and advocates with presenting innovations to teachers who are frequently asked to try technical solutions for performance support or improvement.

  5. Measures for the Diffusion of Solar PV are Aligned in Technology Action Plans for Six Countries in Africa

    DEFF Research Database (Denmark)

    Nygaard, Ivan; Hansen, Ulrich Elmer; Pedersen, Mathilde Brix

    2014-01-01

    African countries from 2010 to 2013, dedicated government committees have prioritized climate change mitigation technologies and developed action plans for the diffusion of the selected technologies. The project results show that solar PV is high on the agenda in Africa. Six out of ten countries...... in the region prioritized solar PV, and action plans for the diffusion of solar home systems were put forward in Cote d’Ivoire, Kenya, Mali and Senegal, while the implementation of grid-connected systems was proposed in Rwanda, Mali and Senegal. The project reports and technology action plans prepared...... in these six countries are used as the basis for comparing how solar PV is perceived in these countries and how policy measures enabling environmental adjustments and investment programmes are being planned to promote diffusion of the technology in these different contexts....

  6. Identifying influential factors on integrated marketing planning using information technology

    Directory of Open Access Journals (Sweden)

    Karim Hamdi

    2014-07-01

    Full Text Available This paper presents an empirical investigation to identify important factors influencing integrated marketing planning using information technology. The proposed study designs a questionnaire for measuring integrated marketing planning, which consists of three categories of structural factors, behavioral factors and background factors. There are 40 questions associated with the proposed study in Likert scale. Cronbach alphas have been calculated for structural factors, behavioral factors and background factors as 0.89, 0.86 and 0.83, respectively. Using some statistical test, the study has confirmed the effects of three factors on integrated marketing. In addition, the implementation of Freedman test has revealed that structural factors were the most important factor followed by background factors and behavioral factors.

  7. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  8. Identifying and overcoming barriers to technology implementation

    International Nuclear Information System (INIS)

    Bailey, M.; Warren, S.; McCune, M.

    1996-01-01

    In a recent General Accounting Office report, the Department of Energy's (DOE) Office of Environmental Management was found to be ineffective in integrating their environmental technology development efforts with the cleanup actions. As a result of these findings, a study of remediation documents was performed by the Technology Applications Team within DOE's Office of Environmental Restoration (EM-40) to validate this finding and to understand why it was occurring. A second initiative built on the foundation of the remediation document study and evaluated solutions to the ineffective implementation of improved technologies. The Technology Applications Team examined over 50 remediation documents (17 projects) which included nearly 600 proposed remediation technologies. It was determined that very few technologies are reaching the Records of Decision documents. In fact, most are eliminated in the early stages of consideration. These observations stem from regulators' and stakeholders' uncertainties in cost and performance of the technology and the inability of the technology to meet site specific conditions. The Technology Applications Team also set out to identify and evaluate solutions to barriers to implementing innovative technology into the DOE's environmental management activities. Through the combined efforts of DOE and the Hazardous Waste Action Coalition (HWAC), a full day workshop was conducted at the annual HWAC meeting in June 1995 to solve barriers to innovative technology implementation. Three barriers were identified as widespread throughout the DOE complex and industry. Identified barriers included a lack of verified or certified cost and performance data for innovative technologies; risk of failure to reach cleanup goals using innovative technologies; and communication barriers that are present at virtually every stage of the characterization/remediation process from development through implementation

  9. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  10. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  11. Safeguards Technology Strategic Planning Pentachart

    International Nuclear Information System (INIS)

    Carroll, C. J.

    2017-01-01

    Builds on earlier strategic planning workshops conducted for SGIT, SGTS, and SGCP. Many of recommendations from these workshops have been successfully implemented at the IAEA. Provide a context for evaluating new approaches for anticipated safeguards challenges of the future. Approach used by government and military to plan for an uncertain future. Uses consensus decision-making.

  12. Health Information Technology (HIT) Adaptation: Refocusing on the Journey to Successful HIT Implementation.

    Science.gov (United States)

    Yen, Po-Yin; McAlearney, Ann Scheck; Sieck, Cynthia J; Hefner, Jennifer L; Huerta, Timothy R

    2017-09-07

    In past years, policies and regulations required hospitals to implement advanced capabilities of certified electronic health records (EHRs) in order to receive financial incentives. This has led to accelerated implementation of health information technologies (HIT) in health care settings. However, measures commonly used to evaluate the success of HIT implementation, such as HIT adoption, technology acceptance, and clinical quality, fail to account for complex sociotechnical variability across contexts and the different trajectories within organizations because of different implementation plans and timelines. We propose a new focus, HIT adaptation, to illuminate factors that facilitate or hinder the connection between use of the EHR and improved quality of care as well as to explore the trajectory of changes in the HIT implementation journey as it is impacted by frequent system upgrades and optimizations. Future research should develop instruments to evaluate the progress of HIT adaptation in both its longitudinal design and its focus on adaptation progress rather than on one cross-sectional outcome, allowing for more generalizability and knowledge transfer. ©Po-Yin Yen, Ann Scheck McAlearney, Cynthia J Sieck, Jennifer L Hefner, Timothy R Huerta. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 07.09.2017.

  13. Implementation of Emerging Technologies

    DEFF Research Database (Denmark)

    Barba, F. J.; Orlien, Vibeke; Mota, Maria J.

    2016-01-01

    safety are presented and discussed with an ultimate goal to explore strategies for their implementation in the food industry. Novel thermal and nonthermal technologies have shown clear environmental benefits by improving the overall energy efficiency of the process and reducing the use of nonrenewable......Novel processing technologies have been gaining interest among food researchers due to their lower impact on nutritional and sensory properties of the products compared to the conventional thermal techniques. In this chapter some of the most well-studied (eg, high-pressure processing, pulsed...... electric fields, ohmic heating, microwave, and ultrasound) emerging technologies are briefly reviewed. Most of these technologies have found niche applications in the food industry, replacing or complementing conventional preservation technologies. Thereby, data on commercialization, energy, and microbial...

  14. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  15. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  16. Sodium-Bearing Waste Treatment, Applied Technology Plan

    International Nuclear Information System (INIS)

    Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

    2003-01-01

    Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology

  17. Sodium-Bearing Waste Treatment, Applied Technology Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

    2003-06-01

    Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology.

  18. Energy technologies at the cutting edge: international energy technology collaboration IEA Implementing Agreements

    Energy Technology Data Exchange (ETDEWEB)

    Pottinger, C. (ed.)

    2007-05-15

    Ensuring energy security and addressing climate change issues in a cost-effective way are the main challenges of energy policies and in the longer term will be solved only through technology cooperation. To encourage collaborative efforts to meet these energy challenges, the IEA created a legal contract - Implementing Agreement - and a system of standard rules and regulations. This allows interested member and non-member governments or other organisations to pool resources and to foster the research, development and deployment of particular technologies. For more than 30 years, this international technology collaboration has been a fundamental building block in facilitating progress of new or improved energy technologies. There are now 41 Implementing Agreements. This is the third in the series of publications highlighting the recent results and achievements of the IEA Implementing Agreements. This document is arranged in the following sections: Cross-cutting activities (sub-sectioned: Climate technology initiative; Energy Technology Data Eexchange; and Energy technology systems analysis programme); End-use technologies (sub-sectioned: Buildings; Electricity; Industry; and Transport; Fossil fuels (sub-sectioned: Clean Coal Centre; Enhanced oil recovery Fluidized bed conversion; Greenhouse Gas R & D; Multiphase flow sciences); Fusion power; Renewable energies and hydrogen; and For more information (including detail on the IEA energy technology network; IEA Secretariat Implementing Agreement support; and IEA framework. Addresses are given for the Implementing Agreements. The publication is based on core input from the Implementing Agreement Executive Committee.

  19. Idaho Chemical Processing Plant Spent Fuel and Waste Management Technology Development Program Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage and reprocessing since 1953. Reprocessing of SNF has resulted in an existing inventory of 1.5 million gallons of radioactive sodium-bearing liquid waste and 3800 cubic meters (m 3 ) of calcine, in addition to the 768 metric tons (MT) of SNF and various other fuel materials in inventory. To date, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, recent changes in world events have diminished the demand to recover and recycle this material. As a result, DOE has discontinued reprocessing SNF for uranium recovery, making the need to properly manage and dispose of these and future materials a high priority. In accordance with the Nuclear Waste Policy Act (NWPA) of 1982, as amended, disposal of SNF and high-level waste (HLW) is planned for a geological repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP Spent Fuel and Waste Management Technology Development Program (SF ampersand WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will properly stored and prepared for final disposal. Program elements in support of acceptable interim storage and waste minimization include: developing and implementing improved radioactive waste treatment technologies; identifying and implementing enhanced decontamination and decommissioning techniques; developing radioactive scrap metal (RSM) recycle capabilities; and developing and implementing improved technologies for the interim storage of SNF

  20. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  1. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. INFORMATION SYSTEM STRATEGIC PLANNING WITH ENTERPRISE ARCHITECTURE PLANNING

    Directory of Open Access Journals (Sweden)

    Lola Yorita Astri

    2013-05-01

    Full Text Available An integrated information system is needed in an enterprise to support businessprocesses run by an enterprise. Therefore, to develop information system can use enterprisearchitecture approach which can define strategic planning of enterprise information system. SMPNegeri 1 Jambi can be viewed as an enterprise because there are entities that should be managedthrough an integrated information system. Since there has been no unification of different elementsin a unity yet, enterprise architecture model using Enterprise Architecture Planning (EAP isneeded which will obtain strategic planning of enterprise information system in SMP Negeri 1Jambi. The goal of strategic planning of information system with Enterprise Architecture Planning(EAP is to define primary activities run by SMP Negeri 1 Jambi and support activities supportingprimary activities. They can be used as a basis for making data architecture which is the entities ofapplication architecture. At last, technology architecture is designed to describe technology neededto provide environment for data application. The plan of implementation is the activity plan madeto implemented architectures by enterprise.

  3. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  4. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    Energy Technology Data Exchange (ETDEWEB)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel; Sorensen, James; Pekot, Lawrence; Peck, Wesley; Jacobson, Lonny; Bosshart, Nicholas; Hurley, John; Wilson, William; Kurz, Marc; Burnison, Shaughn; Salako, Olarinre; Musich, Mark; Botnen, Barry; Kalenze, Nicholas; Ayash, Scott; Ge, Jun; Jiang, Tao; Dalkhaa, Chantsalmaa; Oster, Benjamin; Peterson, Kyle; Feole, Ian; Gorecki, Charles; Steadman, Edward

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed

  5. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  6. 76 FR 41424 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-07-14

    ... modeling requirement for this SIP call should allow for the use of the modeling protocol developed by Iowa... is making a finding that the Iowa State Implementation Plan (SIP) is substantially inadequate to... ) in Muscatine County, Iowa. The specific SIP deficiencies needing revision are described below. EPA is...

  7. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  8. The Impacts of Demographic Variables on Technological and Contextual Challenges of E-learning Implementation

    Science.gov (United States)

    Aldowah, Hanan; Ghazal, Samar; Naufal Umar, Irfan; Muniandy, Balakrishnan

    2017-09-01

    Information technology has achieved robust growth which has made it possible for learning to occur quickly. The rapid development of information, communication and technologies (ICT) has initiated an unparalleled transformation in universities all over the world. This development of technology and learning is offering new techniques to represent knowledge, new practices, and new global communities of learners. As a result, today’s economic and social changes force universities to try to find new learning approaches and systems. E-learning seems to be an appropriate approach in this aspect. However, the implementation of e-learning systems in universities is not an easy task because of some challenges related to context, technology, and other challenges. This paper studied the impacts of demographic data and reported the critical points for the decision makers to consider when planning and implementing e-learning in universities. A quantitative approach was used to study the effects of technological and contextual challenges on e-learning implementation in which a questionnaire was used for the data collection. According to the findings of the study, the most important challenges of the implementation of e-learning are related either to organizational (Contextual) and technological (technical) issues. The demographic variables have been found to play a direct and indirect role with the technological and contextual challenges of implementing e-learning. This paper showed that there are some significant differences in the two challenges faced by instructors in terms of the demographic variables. The result revealed that some significant differences exist between demographic variables and the two challenges of e-learning in terms of gender, age, teaching experience, ICT experience and e-learning experience. However, there is no significant difference in terms of e-learning experience. The obtained data, from such study, can provide information about what academic

  9. Governance of Information And Communication Technology (ICT System Planning

    Directory of Open Access Journals (Sweden)

    Bahrawi Bahrawi

    2015-07-01

    Full Text Available The intensity of ICT usage continues to increase. This should be accompanied  by the increase of the government's performance, and one of the important components is governance of the ICT system planning. The ICT system planning with a good management will provide significant benefits to the organization. One cause of insignificant benefits ICT to the organizational goals is there is no ICT governance applied.  It can be caused by many things, one of them is the lack of knowledge and awareness about the ICT governance, so there are still many government agencies which have not yet implemented properly the ICT governance. By using quantitative approaches, questionnaire instrument was adapted from the General Guide of the National ICT Governance. Framework COBIT and data analysis techniques adopted from the COBIT Maturity level. This study aims to explore the guidelines as an evaluation tool for the governance of the ICT system planning in Department of Communications and Information Technology in Bitung City. The results of this study found that the institution is still at low level, level 1 with 0,63 maturity level in governance planning of ICT system.

  10. Lead State Implementation Plan (SIP) Checklist Guide

    Science.gov (United States)

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  11. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  12. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  13. Planning research on the next strategical project through the trend analysis on radiation fusion technology, industry and policy

    International Nuclear Information System (INIS)

    Kim, Dong Sub; Choi, Jae Hak; Kim, Tak Hyun

    2013-01-01

    Ο The planning research for establish a detailed implementation strategy to serve as small, but a strong institution leading national radiation research and resolving the pending issues related to using radiation - Now is a time when it needs a implementation strategy to achieve it's unique mission as the sole radiation-specialized research institute leading to promote the radiation industry. Ο The main background of this study is to build the planning of a new paradigm for research and development to cope with the changing domestic and international environment for sustainable growth - As the domestic regional radiation field is getting more competitive and the cooperative group expands, it needs to adapt to the global trend such as technology convergence and acceleration etc.. - The need for establish basic database to make a new strategy in order to narrow the technology gap in the radiation fusion technology comparing to the developed country and cope with emerging country's advancement in technology Ο The use to build basic database to spearhead the project and set aside a budget effectively - It's to be used as a reference to set aside a budget through planning strategy industry field to forecast the industrial demand and variation of the future policy and create blue ocean and niche markets

  14. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  15. U.S. Department of Energy, defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Chee, T.

    1988-01-01

    This paper reports that the program implementation plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  16. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  17. NASA Education Implementation Plan 2015-2017

    Science.gov (United States)

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  18. Technology Integration Division FY 1992 Public Participation Program Management and Implementation Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The mission of the Office of Technology Development (OTD), to develop and apply existing and innovative environmental restoration and waste management technologies to the cleanup to Department of Energy (DOE) sites and facilities in accordance with applicable regulations, is to be carried out through the central mechanisms of the Integrated Demonstration (ID) and Integrated Program (IP). Regulations include provisions for public participation in DOE decision making regarding IDs. Beyond these requirements, DOE seeks to foster a more open culture in which public participation, based on two-way communication between DOE and the public, is not only welcomed, but actively encouraged. The public to which the Program is addressed actually consists of several distinct ''publics:'' state and local government officials; Indian tribes; citizen groups and individuals concerned about specific issues; citizen groups or individuals who are opinion leaders in their communities; other federal agencies; private industry; and academia involved in IDs. Participation of these publics in decision making means that their concerns, needs, objectives, and other input are identified by two-way communication between them and DOE, and that these factors are considered when decisions made about OTD activities. This plan outlines the TIPs Public Participation Program goals, objectives, and steps to be taken during Fiscal Year (FY) 1992 to move toward those goals and objectives, based on the challenges and opportunities currently recognized or assumed

  19. 77 FR 55217 - Health Information Technology Implementation

    Science.gov (United States)

    2012-09-07

    ... Information Technology Implementation AGENCY: Health Resources and Services Administration (HRSA), Department... effective use of Health Information Technology (HIT). SUPPLEMENTARY INFORMATION: Former Grantee of Record... advance information technology resources of Virginia's medically underserved communities, HCHC has...

  20. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  1. Hanford Waste Vitrification Plant applied technology plan

    International Nuclear Information System (INIS)

    Kruger, O.L.

    1990-09-01

    This Applied Technology Plan describes the process development, verification testing, equipment adaptation, and waste form qualification technical issues and plans for resolution to support the design, permitting, and operation of the Hanford Waste Vitrification Plant. The scope of this Plan includes work to be performed by the research and development contractor, Pacific Northwest Laboratory, other organizations within Westinghouse Hanford Company, universities and companies with glass technology expertise, and other US Department of Energy sites. All work described in this Plan is funded by the Hanford Waste Vitrification Plant Project and the relationship of this Plan to other waste management documents and issues is provided for background information. Work to performed under this Plan is divided into major areas that establish a reference process, develop an acceptable glass composition envelope, and demonstrate feed processing and glass production for the range of Hanford Waste Vitrification Plant feeds. Included in this work is the evaluation and verification testing of equipment and technology obtained from the Defense Waste Processing Facility, the West Valley Demonstration Project, foreign countries, and the Hanford Site. Development and verification of product and process models and other data needed for waste form qualification documentation are also included in this Plan. 21 refs., 4 figs., 33 tabs

  2. Planning and implementation of nuclear research programmes

    International Nuclear Information System (INIS)

    Lopes, J.L.

    1986-01-01

    The planning and implementation of nuclear research programmes in developed and developing countries is discussed. The main aspects of these programmes in USA, France, Japan, India and Brazil are reported. (M.W.O.) [pt

  3. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  4. Strategic Planning and the Long-term R&D Plan

    International Nuclear Information System (INIS)

    Cooley, J.

    2015-01-01

    The Department of Safeguards of the International Atomic Energy Agency implements a structured strategic planning process to ensure that safeguards will continue to be both effective and efficient in the future. This process provides the Department with a comprehensive and coherent planning framework for the short (2 years), medium (6 years) and long (12 years) term. The Department's suite of planning documents includes a long-term strategic plan and an associated long-term research and development plan as well as a biennial development and implementation support programme. The Department's Long-Term Strategic Plan 2012-2023 addresses the conceptual framework for safeguards implementation, legal authority, technical capabilities (expertise, equipment and infrastructure) and the human and financial resources necessary for Agency verification activities. As research and development (R&D) are essential to meet the safeguards needs of the future, the Department-s Long-Term R&D Plan 2012-2023 is designed to support the Long-Term Strategic Plan 2012-2023 by setting out the capabilities that the Department needs to achieve its strategic objectives, and key milestones towards achieving those capabilities for which Member State R&D support is needed. The Long-Term R&D Plan 2012-2023 addresses the Department's R&D requirements in areas such as safeguards concepts and approaches; detection of undeclared nuclear material and activities; safeguards equipment and communication; information technology, collection, analysis and security; analytical services; new mandates; and training. Long-term capabilities discussed in the presentation include deployed systems (e.g., equipment at facilities); analytical (e.g., sample analysis), operational (e.g., staff expertise and skills) and readiness (e.g., safeguarding new types of facilities) capabilities. To address near-term development objectives and support the implementation of its verification activities as well as to

  5. 77 FR 2734 - Health Information Technology Implementation

    Science.gov (United States)

    2012-01-19

    ... Information Technology Implementation AGENCY: Health Resources and Services Administration, HHS. ACTION... advance information technology resources of the Tennessee's medically underserved communities, TPCA has... advancement and effective use of Health Information Technology. These advancements will result in measurable...

  6. 76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan

    Science.gov (United States)

    2011-09-19

    ...] Prescription Drug User Fee Act IV Information Technology Plan AGENCY: Food and Drug Administration, HHS. ACTION... information technology (IT) plan entitled ``PDUFA IV Information Technology Plan'' (updated plan) to achieve... Information Technology Plan.'' This plan will meet one of the performance goals agreed to under the 2007...

  7. Bahasa Indonesia: Policy, Implementation, and Planning

    Directory of Open Access Journals (Sweden)

    Risa R. Simanjuntak

    2009-05-01

    Full Text Available Language policy or language planning is still in the surge for familiarity and importance. However, this paper argues that in the case of Bahasa Indonesia current implementations should be evaluated based on its relevance and future plan. The historical perspectives will reveal the roots of the current policy and therefore make foundations for further discussions. From the study of literature, this paper is arguing that new paradigm for nationalism, roles in the global competition, as well as regional languages as competitive advantage could be well adopted to nurture a more inclusive and progressive Bahasa Indonesia.  

  8. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  9. Real-time Planning Support: A Task-technology Fit Perspective

    NARCIS (Netherlands)

    E. Krauth (Elfriede)

    2008-01-01

    textabstractPlanning technology by itself is not sufficient to improve planning performance. What are the factors that determine the extent to which the benefits of planning technology are realized? In order to answer this question, this dissertation studies four mechanisms of fit between task and

  10. Understanding the Role of Culture and Communication in Implementing Planned Organizational Change: The Case of Compstat in Police Organizations

    Science.gov (United States)

    Yuksel, Yusuf

    2013-01-01

    Despite the popularity of planned change efforts, the failure rates of implementation are as high as 50 to 70 percent (Lewis & Seibold, 1998). While these efforts are affected by technical issues, the organizations' approach to change, structure, technological capabilities, and organizational culture and communication practices are…

  11. DOE's Innovative Treatment Remediation Demonstration Program accelerating the implementation of innovative technologies

    International Nuclear Information System (INIS)

    Hightower, M.

    1995-01-01

    A program to help accelerate the adoption and implementation of new and innovative remediation technologies has been initiated by the Department of Energy's (DOE) Environmental Restoration Program Office (EM40). Developed as a Public-Private Partnership program in cooperation with the US Environmental Protection Agency's (EPA) Technology Innovation Office (TIO) and coordinated by Sandia National Laboratories, the Innovative Treatment Remediation Demonstration (ITRD) Program attempts to reduce many of the classic barriers to the use of new technologies by involving government, industry, and regulatory agencies in the assessment, implementation, and validation of innovative technologies. In this program, DOE facilities work cooperatively with EPA, industry, national laboratories, and state and federal regulatory agencies to establish remediation demonstrations using applicable innovative technologies at their sites. Selected innovative technologies are used to remediate small, one to two acre, sites to generate the full-scale and real-world operating, treatment performance, and cost data needed to validate these technologies and gain acceptance by industry and regulatory agencies, thus accelerating their use nationwide. Each ITRD project developed at a DOE site is designed to address a typical soil or groundwater contamination issue facing both DOE and industry. This includes sites with volatile organic compound (VOC), semi-VOC, heavy metal, explosive residue, and complex or multiple constituent contamination. Projects are presently underway at three DOE facilities, while additional projects are under consideration for initiation in FY96 at several additional DOE sites. A brief overview of the ITRD Program, program plans, and the status and progress of existing ITRD projects are reviewed in this paper

  12. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  13. EG and G Idaho environmental protection implementation plan

    International Nuclear Information System (INIS)

    Stump, R.C.

    1989-11-01

    This report describes the EG ampersand G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.0 Additionally, this report is intended to supplement the Department of Energy -- Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 3 figs., 1 tab

  14. Task 9. Deployment of photovoltaic technologies: co-operation with developing countries. PV for rural electrification in developing countries - Programme design, planning and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Parker, W. [Institute for Sustainable Power, Highlands Ranch, CO (United States); Oldach, R.; Wilshaw, A. [IT Power Ltd, The Manor house, Chineham (United Kingdom)

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme takes a look at the design, planning and implementation of PV programmes. The guide contains details on the preparation for PV programmes, including the assessment of needs, stakeholder consultation, social context analysis, supply options and national policy considerations. The establishment of goals, delivery modes, timelines, logistics and quality assurance are discussed. Further, the implementation, monitoring and evaluation of PV programmes is discussed, as are a number of methodologies that have been developed with the aim of improving programme design and implementation. The guide highlights issues pertinent to rural energy programmes in developing countries and leads programme administrators through the process of planning, implementing and evaluating a PV programme.

  15. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  16. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  17. Statistical model of planning technological indicators for oil extraction

    Energy Technology Data Exchange (ETDEWEB)

    Galeyev, R G; Lavushchenko, V P; Sheshnev, A S

    1979-01-01

    The efficiency of the process of oil extraction is determined by the effect of a number of interrelated technological indicators. Analytical expression of the interrelationships of the indicators was represented by an econometric model consisting of a system of linear regression equations. The basic advantage of these models is the possibility of calculating in them different, significantly important interrelationships. This makes it possible to correlate all calculations into a single logically noncontradictory balanced system. The developed model of the technological process of oil extraction makes it possible to significantly facilitate calculation and planning of its basic indicators with regard for system and balance requirements, makes it possible to purposefully generate new variants. In this case because of the optimal distribution of the volumes of geological-technical measures, a decrease in the total outlays for their implementation is achieved. Thus for the Berezovskiy field, this saving was R 150,000.

  18. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-05-01

    This paper presents the status of technology program planning to develop those Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies with significant development heritage: ion electric propulsion and the SP-100 space nuclear power technologies. Detailed plans are presented for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  19. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  20. Disaster recovery plan for Automation Technology

    International Nuclear Information System (INIS)

    Owens, M.J.

    1997-06-01

    Automation Technology provides a multitude of data processing and network services to the Environmental Restoration Contract (ERC). These services include: personal computers, local and wide area networks, and Internet and intranet support and services. ERC employees and client personnel receive these services primarily from the Data Center located on the ground floor in the Bechtel Corporate Center at 3350 George Washington Way, Richland, Washington. Centralized databases, server-based software, and network services for the Bechtel Local Area Network reside on servers located in the Data Center. The data communication circuits supported in this center allow for the transmission of business information to and from all project locations in the Hanford Site complex. The loss of one or more of these functions would seriously impact the ability of the ERC to conduct business and bring a virtual standstill to many ERC employees'' activities. Upon declaration of disaster by the Contingency Manager and the Disaster Recovery Coordinator, the disaster recovery plan will be implemented. 24 tabs

  1. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. Its applicability covers 24 inactive uranium mill tailings sites and approximately 8000 vicinity properties, no two of which are alike. This diversity dictates the more general approach of this plan. In practice, however, site-specific application will be implemented and will require extensive consultation with the appropriate state or tribe and the NRC. In addition, information concerning relevant Federal, state, or tribal standards and regulations will be considered along with any data that may assist in the evaluations. Throughout this process, DOE will encourage state and tribal participation to ensure that compliance with the EPA standards will be achieved

  2. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  3. Evaluation of the effectiveness of the implementation of power plans in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Ruwah, N.; Chang, C., E-mail: ndumzilla@email.kings.ac.kr, E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-07-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  4. Evaluation of the effectiveness of the implementation of power plans in Kenya

    International Nuclear Information System (INIS)

    Ruwah, N.; Chang, C.

    2014-01-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  5. Reimagining the Role of Technology in Education: 2017 National Education Technology Plan Update

    Science.gov (United States)

    Office of Educational Technology, US Department of Education, 2017

    2017-01-01

    The National Education Technology Plan (NETP) sets a national vision and plan for learning enabled by technology through building on the work of leading education researchers; district, school, and higher education leaders; classroom teachers; developers; entrepreneurs; and nonprofit organizations. The principles and examples provided in this…

  6. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  7. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    Science.gov (United States)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  8. A Technological Teacher Education Program Planning Model.

    Science.gov (United States)

    Hansen, Ronald E.

    1993-01-01

    A model for technology teacher education curriculum has three facets: (1) purpose (experiential learning, personal development, technological enlightenment, economic well-being); (2) content (professional knowledge, curriculum development competence, pedagogical knowledge and skill, technological foundations); and (3) process (planned reflection,…

  9. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-01-01

    This paper presents the status of technology program planning to achieve readiness of Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies of significant maturity: ion electric propulsion and the SP-100 space nulcear power technologies. Detailed plans are presented herein for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  10. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  11. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  12. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  13. Requirements for cross-border spatial planning technologies in the European context

    Directory of Open Access Journals (Sweden)

    Frank Susanne

    2017-01-01

    Full Text Available This communication paper investigates requirements for cross-border spatial planning technologies. We refer to European cross-border regions, which are located in the European Baltic Sea Region. We hypothesize that there is no efficient cross-border spatial planning without engagement from various stakeholders, supported by novel spatial planning technologies. This study presents the results from a survey that identifies the requirements for spatial planning technologies adequate for cross - border regions. On the basis of this survey, carried out within the INTECRE project partners coming from the Baltic Sea Region, the study provides general recommendations about cross - border spatial planning technologies. Addressed in the survey are the following central issues: definition of the scope of such technologies, the data base and international planning data provision, features and properties of planning technologies, and stakeholder involvement. The research findings are transferable to wider European and extra- European contexts.

  14. 76 FR 78009 - Information Collection; Implementation of Information Technology Security Provision

    Science.gov (United States)

    2011-12-15

    ...] Information Collection; Implementation of Information Technology Security Provision AGENCY: General Services... collection requirement regarding Implementation of Information Technology Security Provision. Public comments... Information Collection 3090- 0294, Implementation of Information Technology Security Provision, by any of the...

  15. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  16. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  17. Open Technology Development: Roadmap Plan

    National Research Council Canada - National Science Library

    Herz, J. C; Lucas, Mark; Scott, John

    2006-01-01

    .... Collaborative and distributed online tools; and 4. Technological Agility. Open standards and interfaces were initially established through ARPA and distributed via open source software reference implementations...

  18. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  19. Innovation Implementation: The Role of Technology Diffusion Agencies

    Directory of Open Access Journals (Sweden)

    Jasmin Robertson

    2008-08-01

    Full Text Available A great deal of ‘innovation failure’ can be attributed to ineffective implementation, rather than failure of the innovation itself. External agencies such as technology diffusion agencies (TDAs have been created to assist organisations to implement innovation successfully, but there has been little empirical research investigating their roles. This paper presents a longitudinal case study of failed innovation implementation, and highlights in particular the role that technology diffusion agencies can play to prevent such failure in future cases. Results indicate the importance of changes in organisational factors such as training, climate, and management support during the implementation process in predicting outcomes, and imply a role for TDAs in assisting with both technical and non-technical aspects of innovation implementation.

  20. Implementation of BNCT treatment planning procedures

    International Nuclear Information System (INIS)

    Capala, J.; Ma, R.; Diaz, A.Z.; Chanana, A.D.; Coderre, J.A.

    2001-01-01

    Estimation of radiation doses delivered during boron neutron capture therapy (BNCT) requires combining data on spatial distribution of both the thermal neutron fluence and the 10 B concentration, as well as the relative biological effectiveness of various radiation dose components in the tumor and normal tissues. Using the treatment planning system created at Idaho National Engineering and Environmental Laboratory and the procedures we had developed for clinical trials, we were able to optimize the treatment position, safely deliver the prescribed BNCT doses, and carry out retrospective analyses and reviews. In this paper we describe the BNCT treatment planning process and its implementation in the ongoing dose escalation trials at Brookhaven National Laboratory. (author)

  1. Integrating addiction treatment into primary care using mobile health technology: protocol for an implementation research study.

    Science.gov (United States)

    Quanbeck, Andrew R; Gustafson, David H; Marsch, Lisa A; McTavish, Fiona; Brown, Randall T; Mares, Marie-Louise; Johnson, Roberta; Glass, Joseph E; Atwood, Amy K; McDowell, Helene

    2014-05-29

    Healthcare reform in the United States is encouraging Federally Qualified Health Centers and other primary-care practices to integrate treatment for addiction and other behavioral health conditions into their practices. The potential of mobile health technologies to manage addiction and comorbidities such as HIV in these settings is substantial but largely untested. This paper describes a protocol to evaluate the implementation of an E-Health integrated communication technology delivered via mobile phones, called Seva, into primary-care settings. Seva is an evidence-based system of addiction treatment and recovery support for patients and real-time caseload monitoring for clinicians. Our implementation strategy uses three models of organizational change: the Program Planning Model to promote acceptance and sustainability, the NIATx quality improvement model to create a welcoming environment for change, and Rogers's diffusion of innovations research, which facilitates adaptations of innovations to maximize their adoption potential. We will implement Seva and conduct an intensive, mixed-methods assessment at three diverse Federally Qualified Healthcare Centers in the United States. Our non-concurrent multiple-baseline design includes three periods - pretest (ending in four months of implementation preparation), active Seva implementation, and maintenance - with implementation staggered at six-month intervals across sites. The first site will serve as a pilot clinic. We will track the timing of intervention elements and assess study outcomes within each dimension of the Reach, Effectiveness, Adoption, Implementation, and Maintenance framework, including effects on clinicians, patients, and practices. Our mixed-methods approach will include quantitative (e.g., interrupted time-series analysis of treatment attendance, with clinics as the unit of analysis) and qualitative (e.g., staff interviews regarding adaptations to implementation protocol) methods, and assessment of

  2. EPOS Thematic Core Service Anthropogenic Hazards: Implementation Plan

    Science.gov (United States)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Grasso, Jean Robert; Schmittbuhl, Jean; Styles, Peter; Kwiatek, Grzegorz; Sterzel, Mariusz; Garcia, Alexander

    2015-04-01

    EPOS Thematic Core Service ANTHROPOGENIC HAZARDS (TCS AH) aims to integrate distributed research infrastructures (RI) to facilitate and stimulate research on anthropogenic hazards (AH) especially those associated with the exploration and exploitation of geo-resources. The innovative element is the uniqueness of the integrated RI which comprises two main deliverables: (1) Exceptional datasets, called "episodes", which comprehensively describe a geophysical process; induced or triggered by human technological activity, posing hazard for populations, infrastructure and the environment, (2) Problem-oriented, bespoke services uniquely designed for the discrimination and analysis of correlations between technology, geophysical response and resulting hazard. These objectives will be achieved through the Science-Industry Synergy (SIS) built by EPOS WG10, ensuring bi-directional information exchange, including unique and previously unavailable data furnished by industrial partners. The Episodes and services to be integrated have been selected using strict criteria during the EPOS PP. The data are related to a wide spectrum of inducing technologies, with seismic/aseismic deformation and production history as a minimum data set requirement and the quality of software services is confirmed and referenced in literature. Implementation of TCS AH is planned for four years and requires five major activities: (1) Strategic Activities and Governance: will define and establish the governance structure to ensure the long-term sustainability of these research infrastructures for data provision through EPOS. (2) Coordination and Interaction with the Community: will establish robust communication channels within the whole TCS AH community while supporting global EPOS communication strategy. (3) Interoperability with EPOS Integrated Core Service (ICS) and Testing Activities: will coordinate and ensure interoperability between the RIs and the ICS. Within this modality a functional e

  3. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  4. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  5. Future Ready Learning: Reimagining the Role of Technology in Education. 2016 National Education Technology Plan

    Science.gov (United States)

    Thomas, Susan

    2016-01-01

    The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…

  6. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Science.gov (United States)

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  7. Critical success factors for offshoring of enterprise resource planning (ERP implementations

    Directory of Open Access Journals (Sweden)

    Rajneesh Chauhan

    2012-01-01

    Full Text Available Background: In recent years, offshoring enterprise resource planning (ERP implementation has been an emerging trend in the field of offshoring information technology (IT. However, both ERP implementations and IT offshoring are fraught with risks, and when both ERP implementation and IT offshoring happen together, the risks become even more pronounced. Therefore, it is important to understand and identify the issues of ERP implementation in an offshoring situation. Objectives: The purpose of this paper is to highlight the key factors that enable successful offshoring ERP implementation from the client and the vendor perspective. Methods/Approach: The paper uses literature as a basis for identifying a critical success factor, data collected through semi-structured interviews with ERP managers at various levels of the subject organizations, and eventually their analysis. Results: The findings of the paper reveal that various factors are critical while implementing offshoring ERP. They include: offshoring partnership, project management, project team composition, people issues, communications and compliance of the onsite team composition. It is also noticed that ten factors are grouped into three categories: the client side, the vendor side, and both. Conclusions: Organizations are currently undertaking or considering the offshoring ERP implementation particularly from India. This paper will enable them to understand the possible challenges and areas of offshoring the ERP implementation program. The value and originality of the paper comes from the fact that up to now, ERP implementation in offshoring has not been comprehensively explored. This research provides a complete understanding of the critical success factors from the client, the vendor or both the client and the vendor perspective. It also enables researchers to analyse ili rethink ili review offshoring in different service areas.

  8. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  9. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and...

  10. The Implementation of an Interdisciplinary Co-planning Team Model Among Mathematics and Science Teachers

    Science.gov (United States)

    Brown, Michelle Cetner

    In recent years, Science, Technology, Engineering, and Mathematics (STEM) education has become a significant focus of numerous theoretical and commentary articles as researchers have advocated for active and conceptually integrated learning in classrooms. Drawing connections between previously isolated subjects, especially mathematics and science, has been shown to increase student engagement, performance, and critical thinking skills. However, obstacles exist to the widespread implementation of integrated curricula in schools, such as teacher knowledge and school structure and culture. The Interdisciplinary Co-planning Team (ICT) model, in which teachers of different subjects come together regularly to discuss connections between content and to plan larger interdisciplinary activities and smaller examples and discussion points, offers a method for teachers to create sustainable interdisciplinary experiences for students within the bounds of the current school structure. The ICT model is designed to be an iterative, flexible model, providing teachers with both a regular time to come together as "experts" and "teach" each other important concepts from their separate disciplines, and then to bring their shared knowledge and language back to their own classrooms to implement with their students in ways that fit their individual classes. In this multiple-case study, which aims to describe the nature of the co-planning process, the nature of plans, and changes in teacher beliefs as a result of co-planning, three pairs of secondary mathematics and science teachers participated in a 10-week intervention with the ICT model. Each pair constituted one case. Data included observations, interviews, and artifact collection. All interviews, whole-group sessions, and co-planning sessions were transcribed and coded using both theory-based and data-based codes. Finally, a cross-case comparison was used to present similarities and differences across cases. Findings suggest that the

  11. National Security Technology Incubator Business Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-31

    This document contains a business plan for the National Security Technology Incubator (NSTI), developed as part of the National Security Preparedness Project (NSPP) and performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This business plan describes key features of the NSTI, including the vision and mission, organizational structure and staffing, services, evaluation criteria, marketing strategies, client processes, a budget, incubator evaluation criteria, and a development schedule. The purpose of the NSPP is to promote national security technologies through business incubation, technology demonstration and validation, and workforce development. The NSTI will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The vision of the NSTI is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety, security, and protection of the homeland. The NSTI is operated and managed by the Arrowhead Center, responsible for leading the economic development mission of New Mexico State University (NMSU). The Arrowhead Center will recruit business with applications for national security technologies recruited for the NSTI program. The Arrowhead Center and its strategic partners will provide business incubation services, including hands-on mentoring in general business matters, marketing, proposal writing, management, accounting, and finance. Additionally, networking opportunities and technology development assistance will be provided.

  12. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  13. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  14. Proceedings of the Technology Roadmap Workshop on Communication and Control Systems for Distributed Energy Implementation and Testing

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2002-05-01

    More than 50 experts from energy and information technology industries, Federal and State government agencies, universities, and National Laboratories participated in the “Communication and Control Systems for Distributed Energy Implementation and Testing Workshop” in Reston, Virginia, on May 14-15, 2002. This was a unique workshop in that, for the first time, representatives from the information technology sector and those from energy-related industries, Federal and State government agencies, universities, and National Laboratories, gathered to discuss these issues and develop a set of action-oriented implementation strategies. A planning committee of industry, consultant, and government representatives laid the groundwork for the workshop by identifying key participants and developing an appropriate agenda. This document reflects the ideas and priorities discussed by workshop participants.

  15. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  16. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  17. Systems autonomy technology: Executive summary and program plan

    Science.gov (United States)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  18. A network collaboration implementing technology to improve medication dispensing and administration in critical access hospitals.

    Science.gov (United States)

    Wakefield, Douglas S; Ward, Marcia M; Loes, Jean L; O'Brien, John

    2010-01-01

    We report how seven independent critical access hospitals collaborated with a rural referral hospital to standardize workflow policies and procedures while jointly implementing the same health information technologies (HITs) to enhance medication care processes. The study hospitals implemented the same electronic health record, computerized provider order entry, pharmacy information systems, automated dispensing cabinets (ADC), and barcode medication administration systems. We conducted interviews and examined project documents to explore factors underlying the successful implementation of ADC and barcode medication administration across the network hospitals. These included a shared culture of collaboration; strategic sequencing of HIT component implementation; interface among HIT components; strategic placement of ADCs; disciplined use and sharing of workflow analyses linked with HIT applications; planning for workflow efficiencies; acquisition of adequate supply of HIT-related devices; and establishing metrics to monitor HIT use and outcomes.

  19. Technology transfer in Activities Implemented Jointly (AIJ)

    Energy Technology Data Exchange (ETDEWEB)

    Usher, P.E.O. [United Nations Environment Programme (Cayman Islands)

    1998-08-01

    The agreed objective of the United Nations Framework Convention on Climate Change is to bring about early and significant reductions in greenhouse gas emissions. For many, the most attractive option for promoting this end is joint implementation. Indivisible from this is the transfer of current and innovative technology, though technology transfer is not conditional on joint implementation. The somewhat ad hoc nature of Activities Implemented Jointly (AIJ) and the failure to establish ground rules at the outset is considered. Common action can contribute to cost-effective mitigation of climate change through a sharing of the costs, benefits and risks of R and D, cross fertilisation of ideas among countries, economies of scale for new technologies, and clear signals to the international market. Potential problems include: the reluctance of national private industry to share proprietary information which might compromise competitiveness; premature convergence on technical standards that might inhibit the emergence of more developed technology; specific national circumstances which mean that solutions satisfactory to others are inappropriate in its case. This latter issue is of particular relevance to developing countries. AIJ needs to be approached in a systematic way taking into account lessons learned from evaluating the pilot phase if it is to be seen to be working effectively. (UK)

  20. COMPLEAT (Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies): A planning tool for publicly owned electric utilities. [Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies (Compleat)

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    COMPLEAT takes its name, as an acronym, from Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies. It is an electric utility planning model designed for use principally by publicly owned electric utilities and agencies serving such utilities. As a model, COMPLEAT is significantly more full-featured and complex than called out in APPA's original plan and proposal to DOE. The additional complexity grew out of a series of discussions early in the development schedule, in which it became clear to APPA staff and advisors that the simplicity characterizing the original plan, while highly desirable in terms of utility applications, was not achievable if practical utility problems were to be addressed. The project teams settled on Energy 20/20, an existing model developed by Dr. George Backus of Policy Assessment Associates, as the best candidate for the kinds of modifications and extensions that would be required. The remainder of the project effort was devoted to designing specific input data files, output files, and user screens and to writing and testing the compute programs that would properly implement the desired features around Energy 20/20 as a core program. This report presents in outline form, the features and user interface of COMPLEAT.

  1. 78 FR 48326 - Partial Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements

    Science.gov (United States)

    2013-08-08

    ... Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements AGENCY: Environmental Protection... behalf of National Parks Conservation Association, Sierra Club, Physicians for Social Responsibility... Haze State Implementation Plan Revision submitted by the Arizona Department of Environmental Quality on...

  2. EG and G Idaho Environmental Protection Implementation Plan (1990)

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  3. EG and G Idaho Environmental Protection Implementation Plan (1991)

    Energy Technology Data Exchange (ETDEWEB)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  4. EG and G Idaho Environmental Protection Implementation Plan (1991)

    International Nuclear Information System (INIS)

    Graham, J.F.

    1991-11-01

    This report describes the EG ampersand G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab

  5. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  6. Implementing the leadership development plans of faculty education fellows: a structured approach.

    Science.gov (United States)

    Goldman, Ellen F; Wesner, Marilyn; Karnchanomai, Ornpawee; Haywood, Yolanda

    2012-09-01

    The literature about medical education faculty fellowship programs, which have grown in popularity, quantifies program characteristics, provides exemplars, and reports on delivery strategies. Evaluation is generally limited to satisfaction measures, with a few longitudinal studies of postprogram achievements, but none on the process of making these changes.The authors describe the development of faculty members' postfellowship leadership plans and a structured process to support plan implementation. They also compare the implementation of initiatives specified in individual leadership development plans of two cohorts of faculty. The participants were graduates of a fellowship program at the George Washington University School of Medicine and Health Sciences. One cohort participated in a structured process of monthly reciprocal peer coaching, followed by journaling and quarterly interviews with the program director; a second cohort functioned as a comparison with no structured process supporting them. (Study years are not provided because they could inadvertently lead to the identification of the participants.) Despite similar implementation challenges expressed by both cohorts, the cohort participating in the structured process implemented 23% more of their planned initiatives, including 2 times as many educational leadership initiatives and 3.5 times as many initiatives related to developing new curriculum. The combination of plan development, reciprocal peer coaching, journaling, and interview discussions provided faculty with focus, structure, and personal support. This structured process supporting leadership plan development and implementation can be easily transferred to other fellowship programs in medical education, adapted for use with residents and fellows, and used in similar development programs.

  7. Nuclear science and technology plan (1989-1993)

    International Nuclear Information System (INIS)

    1989-01-01

    The nuclear science and technology plan embodies the objectives strategies and activities of the Philippine Nuclear Research Institute (PNRI). It is an integral component of the national effort to make the Philippines a newly industrialized country (NIC) by the year 2000. The four major plans under the program are as follows: 1) Radiation protection and nuclear safety, 2) Radiation technology and engineering, 3) Radioisotopes and nuclear techniques application and 4) special projects. The cost of the plan is estimated to be two hundred ninety three million pesos (293, 000,000) for 1989-1993 covering personnel services (39.7%), maintenance and operating expenses (42.7%), equipment outlay (4.8%) and infrastructure (12.8%). The details of the different programs are given. (ELC). 7 figs.; 8 tabs

  8. Challenges of Implementing Renewable Energy Policies at Community Scale: The Case of Strategic Energy Plans in Denmark

    DEFF Research Database (Denmark)

    Petersen, Jens-Phillip

    2017-01-01

    The implementation of national energy efficiency targets requires policies at the local scale. It is widely acknowledged that local communities play an important tole to implement these policies: as arena where renewable energy technologies can be combined with socio-economic interests of local...... stakeholders. Although a vast amount of demo projects are well-documented, insufficient attention has been given to the average performing municipalities and their challenges in linking technical energy scenarios with their socio-economic realities in practice. This paper analyses the Strategic Energy Plans...... (SEP) of 17 Danish municipalities on their development, inclusion of local communities, affected stakeholders, and on their impact on the municipalities’ working procedures. The main technical, physical, organisational and socio-economic challenges for local energy policy implementation are illustrated...

  9. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    Science.gov (United States)

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  10. IAEA Global Support of Decommissioning Implementation with a Focus on Advanced Technologies

    International Nuclear Information System (INIS)

    Michal, Vladimir; )

    2017-01-01

    Recently there are about 140 power reactors in decommissioning phase worldwide excluding 17+ that might be considered as decommissioned. In addition, more than 400 other nuclear facilities, such as research reactors or nuclear fuel cycle facilities, have been shutdown for decommissioning, have been undergoing active decommissioning or have already been fully dismantled. The IAEA provides various kind of support for Member States including publication of safety and technical reports providing guidance, recommendations, experiences, good practices and lessons learned covering the preparatory and implementation decommissioning phases. Many training courses, workshops, seminars etc. were organized to support sharing of good practices among specialists and organizations involved. In line with the non-technical aspects, such as decommissioning planning, costing, managerial approaches etc., there are also presented and discussed technical solutions often with a focus on the advanced technologies to be considered. Several completed and ongoing IAEA initiatives partially or fully address the advanced approaches and techniques to support safe and effective implementation of decommissioning projects. The presentation will provide an overview of relevant activities organized so far and perspectives of the IAEA on advanced technologies for decommissioning. (author)

  11. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  12. Development and implementation of the compensation plan for pharmacy services in Alberta, Canada.

    Science.gov (United States)

    Breault, Rene R; Whissell, Jeff G; Hughes, Christine A; Schindel, Theresa J

    To describe experiences with development and implementation of a compensation plan for pharmacy services delivered by pharmacists in community pharmacies. Community pharmacy practice in Alberta, Canada. Pharmacists in Alberta have one of the most progressive scopes of practice in North America. They have authority to prescribe drugs independently, administer drugs by injection, access electronic health records, and order laboratory tests. A publicly funded compensation plan for pharmacy services was implemented in 2012. Principles that guided development of the compensation plan aimed to 1) ensure payment for pharmacy services, 2) support pharmacists in using their full scope of practice, 3) enable the development of long-term relationships with patients, 4) facilitate expansion of services delivered by pharmacists, and 5) provide access to pharmacy services for all eligible Albertans. Services covered by the compensation plan include care planning, prescribing, and administering drugs by injection. The guiding principles were used to evaluate experiences with the compensation plan. Claims for pharmacy services covered by the compensation plan increased from 30,000 per month in July 2012 to 170,000 per month in March 2016. From September 2015 to August 2016, 1226 pharmacies submitted claims for services provided by 3901 pharmacists. The number of pharmacists with authorization to prescribe and administer injections continued to increase following implementation of the plan. Alberta's experiences with the development and implementation of the compensation plan will be of interest to jurisdictions considering implementation of remunerated pharmacy services. The potential impact of the plan on health and economic outcomes, in addition to the value of the services as perceived by the public, patients, pharmacists, and other health care providers, should also be explored. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  13. Rehabilitation in Madagascar: Challenges in implementing the World Health Organization Disability Action Plan.

    Science.gov (United States)

    Khan, Fary; Amatya, Bhasker; Mannan, Hasheem; Burkle, Frederick M; Galea, Mary P

    2015-09-01

    To provide an update on rehabilitation in Madagascar by using local knowledge to outline the potential barriers and facilitators for implementation of the World Health Organization (WHO) Disability Action Plan (DAP). A 14-day extensive workshop programme (September-October 2014) was held at the University Hospital Antananarivo and Antsirabe, with the Department of Health Madagascar, by rehabilitation staff from Royal Melbourne Hospital, Australia. Attendees were rehabilitation professionals (n=29) from 3 main rehabilitation facilities in Madagascar, who identified various challenges faced in service provision, education and attitudes/approaches to people with disabilities. Their responses and suggested barriers/facilitators were recorded following consensus agreement, using objectives listed in the DAP. The barriers and facilitators outlined by participants in implementing the DAP objectives include: engagement of health professionals and institutions using a multi-sectoral approach, new partnerships, strategic collaboration, provision of technical assistance, future policy directions, and research and development. Other challenges for many basic policies included: access to rehabilitation services, geographical coverage, shortage of skilled work-force, limited info-technology systems; lack of care-models and facility/staff accreditation standards; limited health services infrastructure and "disconnect" between acute and community-based rehabilitation. The DAP summary actions were useful planning tools to improve access, strengthen rehabilitation services and community-based rehabilitation, and collate data for outcome research.

  14. Incorporating Implementation of ITS Technologies into Local Planning Processes

    Science.gov (United States)

    1998-09-16

    In this paper, the author discusses the barriers to implementing intelligent : transportation systems (ITS) at the local level. Chief among these is the need t : o education the public. At the same time, this educational effort must be : tailored for...

  15. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  16. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  17. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  18. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  19. 2016-2020 Strategic Plan and Implementing Framework

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  20. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  1. Problems in implementation of the spatial plan of the Republic of Srpska until 2015: Quantitative analysis

    Directory of Open Access Journals (Sweden)

    Bijelić Branislav

    2017-01-01

    Full Text Available The implementation of spatial plans in the Republic of Srpska is certainly the weakest phase of the process of spatial planning in this entity. It is particularly evident in the case of the Spatial Plan of the Republic of Srpska until 2015 which is the highest strategic spatial planning document in the Republic of Srpska. More precisely, the implementation of spatial plans has been defined as the carrying out of spatial planning documents, i.e. planning propositions as defined in the spatial plans. For the purpose of this paper, a quantitative analysis of the implementation of the planning propositions envisioned by this document has been carried out. The difference between what was planned and what was implemented at the end of the planning period (ex-post evaluation of planning decisions is presented in this paper. The weighting factor is defined for each thematic field and planning proposition, where the main criterion for determining the weighting factor is the share of the planning proposition and thematic field in the estimated total costs of the plan (financial criterion. The paper has also tackled the issue of the implementation of the Spatial Plan of Bosnia and Herzegovina for the period 1981 - 2000, as well as of the Spatial Plan of the Republic of Srpska 1996 - 2001 - Phased Plan for the period 1996 - 2001, as the previous strategic spatial planning documents of the highest rank covering the area of the Republic of Srpska. The research results have proven primary hypothesis of the paper that the level of the implementation of Spatial Plan of the Republic of Srpska until 2015 is less than 10%.

  2. MRP (materiel requirements planning) II implementation: a case study.

    Science.gov (United States)

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  3. Beyond usability: designing effective technology implementation systems to promote patient safety.

    Science.gov (United States)

    Karsh, B-T

    2004-10-01

    Evidence is emerging that certain technologies such as computerized provider order entry may reduce the likelihood of patient harm. However, many technologies that should reduce medical errors have been abandoned because of problems with their design, their impact on workflow, and general dissatisfaction with them by end users. Patient safety researchers have therefore looked to human factors engineering for guidance on how to design technologies to be usable (easy to use) and useful (improving job performance, efficiency, and/or quality). While this is a necessary step towards improving the likelihood of end user satisfaction, it is still not sufficient. Human factors engineering research has shown that the manner in which technologies are implemented also needs to be designed carefully if benefits are to be realized. This paper reviews the theoretical knowledge on what leads to successful technology implementation and how this can be translated into specifically designed processes for successful technology change. The literature on diffusion of innovations, technology acceptance, organisational justice, participative decision making, and organisational change is reviewed and strategies for promoting successful implementation are provided. Given the rapid and ever increasing pace of technology implementation in health care, it is critical for the science of technology implementation to be understood and incorporated into efforts to improve patient safety.

  4. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  5. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  6. Planning, design and technological criteria of conventional and nuclear shelters

    International Nuclear Information System (INIS)

    Sadoon, A.S.

    1989-01-01

    The thesis aims to establish a special criteria for building the shelters in two types. The conventional and nuclear, in respect to planning design and technological aspects, and finally establishing a special reference of planning, design and technology for Iraq which can be used when planning or designing a conventional or nuclear shelter. The thesis included four chapters, the first chapter included definition of shelters, and explanation of the effects of all types of weapons on buildings, and the second chapter included definition of planning and design concepts of shelters in its two types and analytical studies for international examples. The third chapter covered definition for technologies of structural, mechanical, electrical and sanitary systems. The fourth chapter included details of a case study in order to approach the results of research which included the conclusions, recommendations, criteria and prospects of planning design and technological aspects. 51 tabs.; 180 figs.; 32 refs.; 15 apps

  7. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  8. Plans for modeling rational acceptance of technology

    NARCIS (Netherlands)

    Houkes, W.N.; Pols, A.J.K.; Michelfelder, D.P.; McCarthy, N.; Goldberg, D.E.

    2013-01-01

    We argue that the use-plan analysis of artefact use and design can be combined with the Unified Theory of Acceptance and Use of Technology (UTAUT), a well-tested model for predicting the adoption of information systems in organizational contexts. After presenting the outlines of the use-plan

  9. Implementation of Paste Backfill Mining Technology in Chinese Coal Mines

    Science.gov (United States)

    Chang, Qingliang; Zhou, Huaqiang; Bai, Jianbiao

    2014-01-01

    Implementation of clean mining technology at coal mines is crucial to protect the environment and maintain balance among energy resources, consumption, and ecology. After reviewing present coal clean mining technology, we introduce the technology principles and technological process of paste backfill mining in coal mines and discuss the components and features of backfill materials, the constitution of the backfill system, and the backfill process. Specific implementation of this technology and its application are analyzed for paste backfill mining in Daizhuang Coal Mine; a practical implementation shows that paste backfill mining can improve the safety and excavation rate of coal mining, which can effectively resolve surface subsidence problems caused by underground mining activities, by utilizing solid waste such as coal gangues as a resource. Therefore, paste backfill mining is an effective clean coal mining technology, which has widespread application. PMID:25258737

  10. A planning framework for transferring building energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B C; Brown, M A; Mohler, B L; Wilde, M; Abel, F H

    1990-07-01

    Accelerating the adoption of new and existing cost-effective technologies has significant potential to reduce the energy consumed in US buildings. This report presents key results of an interlaboratory technology transfer planning effort in support of the US Department of Energy's Office of Building Technologies (OBT). A guiding assumption for planning was that OBT's R D program should forge linkages with existing programs whose goals involved enhancing energy efficiency in buildings. An ad hoc Technology Transfer Advisory Group reviewed the existing analysis and technology transfer program, brainstormed technology transfer approaches, interviewed DOE program managers, identified applicable research results, and developed a framework that management could use in deciding on the best investments of technology transfer resources. Representatives of 22 organizations were interviewed on their views of the potential for transferring energy efficiency technologies through active linking with OBT. The report describes these programs and interview results; outlines OBT tools, technologies, and practices to be transferred; defines OBT audiences; identifies technology transfer functions and presents a framework devised using functions and audiences; presents some 60 example technology transfer activities; and documents the Advisory Group's recommendations. 37 refs., 3 figs., 12 tabs.

  11. A Senior Teacher's Implementation of Technology Integration

    Science.gov (United States)

    Tsai, Hsien-Chang

    2015-01-01

    This study investigated whether a senior teacher with many years of teaching experience, despite lacking adequate technology skills or contending with other barriers, can sufficiently implement technology integration in the classroom. The research was conducted between October 2013 and January 2014 and was focused on a junior high school biology…

  12. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  13. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  14. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    International Nuclear Information System (INIS)

    Tian, Zhen; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B.; Peng, Fei

    2015-01-01

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques

  15. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  16. Energy Technology Initiatives - Implementation Through Multilateral Co-operation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-15

    New technologies will be critical in addressing current global energy challenges such as energy security. More must be done, however, to push forward the development and deployment of the technologies we need today and will need in the future. Government leaders have repeatedly underlined the crucial role of industry and businesses in advancing energy technologies and the importance of strong collaboration among all stakeholders to accelerate technology advances. To attain these goals, increased co-operation between industries, businesses and government energy technology research is indispensable. The public and private sectors must work together, share burdens and resources, while at the same time multiplying results and outcomes. The 42 multilateral technology initiatives (Implementing Agreements) supported by the IEA are a flexible and effective framework for IEA member and non-member countries, businesses, industries, international organisations and non-government organisations to research breakthrough technologies, to fill existing research gaps, to build pilot plants, to carry out deployment or demonstration programmes -- in short to encourage technology-related activities that support energy security, economic growth and environmental protection. This publication highlights the significant accomplishments of the IEA Implementing Agreements.

  17. Applied technology center business plan and market survey

    Science.gov (United States)

    Hodgin, Robert F.; Marchesini, Roberto

    1990-01-01

    Business plan and market survey for the Applied Technology Center (ATC), computer technology transfer and development non-profit corporation, is presented. The mission of the ATC is to stimulate innovation in state-of-the-art and leading edge computer based technology. The ATC encourages the practical utilization of late-breaking computer technologies by firms of all variety.

  18. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  19. The implementation of virtualization technology in EAST data system

    International Nuclear Information System (INIS)

    Wang, Feng; Sun, Xiaoyang; Li, Shi; Wang, Yong; Xiao, Bingjia; Chang, Sidi

    2014-01-01

    Highlights: • The server virtualization based on XenServer has been used in EAST data center for common servers and software development platform. • The application virtualization based on XenApp has been demonstrated in EAST to provide an easy and unified data browser method. • The desktop virtualization based on XenDesktop has been adopted for desktop virtualization in the new EAST central control room. - Abstract: The virtualization technology is very popular in many fields at present which has many advantages such as reducing costs, unified management, mobile applications, cross platform, etc. We have also implemented the virtualization technology in EAST control and data system. There are primarily four kinds of technology providers in virtualization technology including VMware, Citrix, Microsoft Hyper-V as well as open source solutions. We have chosen the Citrix solution to implement our virtualization system which mainly includes three aspects. Firstly, we adopt the XenServer technology to realize virtual server for EAST data management and service system. Secondly, we use XenApp technology to realize cross platform system for unify data access. Thirdly, in order to simplify the management of the client computers, we adopt the XenDesktop technology to realize virtual desktops for new central control room. The details of the implementation are described in this paper

  20. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  1. Technology roadmaps

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, B. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Energy Technology Centre

    2003-07-01

    The purpose of a technology road map is to define the state of a current technology, relevant market issues, and future market needs; to develop a plan that industry can follow to provide these new products and services; and to map technology pathways and performance goals for bringing these products and services to market. The three stages (planning, implementation, and reviewing and updating), benefits, and status of the Clean Coal Technology Roadmap are outlined. Action Plan 2000, a $1.7 million 2000 Climate Change Technology and Innovation Program, which uses the technology roadmapping process, is described. The members of the management steering committee for the Clean Coal Technology Roadmap are listed. A flowsheet showing activities until November 2004, when the final clean coal road map is due, is included.

  2. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    Directory of Open Access Journals (Sweden)

    Ionica Oncioiu

    2014-10-01

    Full Text Available This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitive advantage resulting in innovative products, as well as the effectiveness of companies that use human resources evaluation platform. The need identified on the market to which the SMEs wish to answer by implementing the plan is represented by the nationwide lack of a complex solution covering both the evaluation and the management of human resources performances. The used methodology can be found in the analysis, developing a strategy for preventing financial, human, market, marketing - image risks and also the physical ones. With the SWOT analysis it was observed one of the strengths i.e. the existence of a single management system of employee performance that includes assessment specific features. In conclusion, there are no software solutions at national level, which would assess the human resources of an organization, following specific indicators of that organization, which could combine the assessment methods in order to achieve more a more efficient and versatile assessment.

  3. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  4. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  5. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  6. The emergency plan implementing procedures for HANARO facility

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Tai; Khang, Byung Oui; Lee, Goan Yup; Lee, Moon [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    The radiological emergency plan implementing procedures of HANARO (High-flux Advanced Neutron Application Reactor) facility is prepared based on the Korea Atomic Law, the Civil Defence Law, Disaster Protection Law and the emergency related regulatory guides such as Guidance for Evolution of Radiation Emergency Plans in Nuclear Research Facilities (KAERI/TR-956/98, Feb.1998) and the emergency plan of HANARO. These procedures is also prepared to ensure adequate response activities to the rediological events which would cause a significant risk to the KAERI staffs and the public nea to the site. Periodic trainning and exercise for the reactor operators and emergency staffs will reduce accident risks and the release of radioactivities to the environment. 61 refs., 81 tabs. (Author)

  7. Application of Multimodality Imaging Fusion Technology in Diagnosis and Treatment of Malignant Tumors under the Precision Medicine Plan.

    Science.gov (United States)

    Wang, Shun-Yi; Chen, Xian-Xia; Li, Yi; Zhang, Yu-Ying

    2016-12-20

    The arrival of precision medicine plan brings new opportunities and challenges for patients undergoing precision diagnosis and treatment of malignant tumors. With the development of medical imaging, information on different modality imaging can be integrated and comprehensively analyzed by imaging fusion system. This review aimed to update the application of multimodality imaging fusion technology in the precise diagnosis and treatment of malignant tumors under the precision medicine plan. We introduced several multimodality imaging fusion technologies and their application to the diagnosis and treatment of malignant tumors in clinical practice. The data cited in this review were obtained mainly from the PubMed database from 1996 to 2016, using the keywords of "precision medicine", "fusion imaging", "multimodality", and "tumor diagnosis and treatment". Original articles, clinical practice, reviews, and other relevant literatures published in English were reviewed. Papers focusing on precision medicine, fusion imaging, multimodality, and tumor diagnosis and treatment were selected. Duplicated papers were excluded. Multimodality imaging fusion technology plays an important role in tumor diagnosis and treatment under the precision medicine plan, such as accurate location, qualitative diagnosis, tumor staging, treatment plan design, and real-time intraoperative monitoring. Multimodality imaging fusion systems could provide more imaging information of tumors from different dimensions and angles, thereby offing strong technical support for the implementation of precision oncology. Under the precision medicine plan, personalized treatment of tumors is a distinct possibility. We believe that multimodality imaging fusion technology will find an increasingly wide application in clinical practice.

  8. Using technology for bed management in public hospitals - A strategic analysis and change management plan

    OpenAIRE

    Brayan, Daniel Joseph

    2005-01-01

    As healthcare organisations in New South Wales, Australia, are facing the increased demands of an aging population, new approaches to improving access to services are being sought. This project explores the potential of applying information technology to the management of beds in a large Sydney public hospital. More specifically, this project addresses the cultural and organizational aspects of hospital environments and factors them into a change management plan for implementing bed managemen...

  9. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Science.gov (United States)

    2011-11-04

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean Vehicles Program AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. This SIP revision contains Pennsylvania's Clean Vehicle Program, which adopts California's second generation low emission vehicle program...

  10. Achieving Technological Literacy in Minnesota.

    Science.gov (United States)

    Lindstrom, Mike

    2002-01-01

    Describes how Minnesota implemented the Standards for Technological Literacy: Content for the Study of Technology. Includes the timeline, rationale, potential activities and estimated costs associated with all phases, and steps for implementing the plan: investigate, replicate, integrate, and mandate. (JOW)

  11. Technology integration plan

    International Nuclear Information System (INIS)

    Henry, R.; Sumpter, K.C.

    1995-01-01

    In 1992, the Secretary of Energy directed the Assistant Secretary for Environmental Management (EM) to develop an integrated, long-term, spent nuclear fuel (SNF) management program. In response, EM created the Integrated SNF Program to assess the US Department of Energy (DOE) SNF and SNF storage facilities. As shown in Figure 1 the Integrated SNF Program is responsible for life-cycle management of DOE SNF; that is characterization, processing, interim storage and preparation for disposal. In order to implement the Program it was recognized that technology needs must be identified. A Technology Integration Program was formed to integrate the DOE complex-wide efforts for establishing timely, cost effective and consistent technical criteria for the development of technical solutions. The program is directed toward identification of: (a) what activities need to be done, (b) when they need to be completed, and (c) what priority should be assigned to the various activities

  12. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in ...

  13. Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan

    Science.gov (United States)

    Allen Solomon; Richard A. Birdsey; Linda A. Joyce

    2010-01-01

    In keeping with the research goals of the U.S. Global Change Research Program, the climate change strategy of the U.S. Department of Agriculture (USDA), and the climate change framework of the Forest Service, this Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan (hereafter called the Research Plan), was written by Forest Service Research...

  14. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated

  15. North Region ROW tool implementation workshop.

    Science.gov (United States)

    2010-08-02

    Welcome to the North Region ROW Tool Workshop. This workshop is funded under an implementation project sponsored by TxDOTs Research & Technology Implementation Office (RTI). This is the second of four regional workshops being planned for this summ...

  16. Health technology assessment to optimize health technology utilization: using implementation initiatives and monitoring processes.

    Science.gov (United States)

    Frønsdal, Katrine B; Facey, Karen; Klemp, Marianne; Norderhaug, Inger Natvig; Mørland, Berit; Røttingen, John-Arne

    2010-07-01

    The way in which a health technology is used in any particular health system depends on the decisions and actions of a variety of stakeholders, the local culture, and context. In 2009, the HTAi Policy Forum considered how health technology assessment (HTA) could be improved to optimize the use of technologies (in terms of uptake, change in use, or disinvestment) in such complex systems. In scoping, it was agreed to focus on initiatives to implement evidence-based guidance and monitoring activities. A review identified systematic reviews of implementation initiatives and monitoring activities. A two-day deliberative workshop was held to discuss key papers, members' experiences, and collectively address key questions. This consensus paper was developed by email and finalized at a postworkshop meeting. Evidence suggests that the impact and use of HTA could be increased by ensuring timely delivery of relevant reports to clearly determined policy receptor (decision-making) points. To achieve this, the breadth of assessment, implementation initiatives such as incentives and targeted, intelligent dissemination of HTA result, needs to be considered. HTA stakeholders undertake a variety of monitoring activities, which could inform optimal use of a technology. However, the quality of these data varies and is often not submitted to an HTA. Monitoring data should be sufficiently robust so that they can be used in HTA to inform optimal use of technology. Evidence-based implementation initiatives should be developed for HTA, to better inform decision makers at all levels in a health system about the optimal use of technology.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  18. A new methodology for strategic planning using technological maps and detection of emerging research fronts applied to radiopharmacy

    International Nuclear Information System (INIS)

    Didio, Robert Joseph

    2011-01-01

    This research aims the development of a new methodology to support the strategic planning, using the process of elaboration of technological maps (TRM - Technological Roadmaps), associated with application of the detection process of emerging fronts of research in databases of scientific publications and patents. The innovation introduced in this research is the customization of the process of TRM to the radiopharmacy and, specifically, its association to the technique of detection of emerging fronts of research, in order to prove results and to establish a new and very useful methodology to the strategic planning of this area of businesses. The business unit DIRF - Diretoria de Radiofarmacia - of IPEN CNEN/SP was used as base of the study and implementation of this methodology presented in this work. (author)

  19. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  20. AEA Technology, Harwell site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This plan, describes the site arrangements and facilities for dealing with an emergency at Harwell. These arrangements consist of amongst other things provision of suitably qualified, experienced and trained staff to take up posts, provision of suitable facilities and equipment, arrangements to alert and protect persons on and off the site, liaison and contact arrangements with external agencies and organisations and supply of information before and during any emergency. Other organisations have their own arrangements for dealing with an emergency at AEA Technology Harwell. The arrangements for dealing with any off-site consequences are drawn together in the ''Oxfordshire County Council Essential Services Emergency Plan (Off-Site) for AEA Technology, Harwell''. Prior information for members of the public who may be affected in the event of an emergency at Harwell is issued in the form of leaflets. (author)

  1. 78 FR 889 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Science.gov (United States)

    2013-01-07

    ... Resources Defense Council; and Physicians for Social Responsibility--Los Angeles, (``environmental and... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0721; FRL-9767-3] Finding of Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South...

  2. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  3. 77 FR 45326 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional...

    Science.gov (United States)

    2012-07-31

    ... available in either location (e.g., Confidential Business Information). To inspect the hard copy materials..., Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of additional...

  4. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  5. Business plan for a technology innovation

    OpenAIRE

    Leikas, Anniina

    2015-01-01

    The aim of this thesis was to create a business plan to understand the potential of the business idea and offer guidance when establishing a new business. The basis was to study the business environment in Finland and what factors need to considered in business planning process. Entrepreneurship is one pos-sibility for the author in the future. Large generations are retiring and the market has place for new entrepreneurs and ideas. The Technology industry is constantly evolving and new i...

  6. Theory and Practice: Implications for the Implementation of Communication Technology in Organizations.

    Science.gov (United States)

    Herndon, Sandra L.

    1997-01-01

    Argues that scientific management principles result in an implementation of technology which fails to take full advantage of organization members and of the technology itself, while in a sociotechnical systems approach, technology is designed and implemented in ways enhancing the potential of both individuals and the technology itself, in…

  7. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  8. 76 FR 49313 - Approval and Promulgation of Implementation Plans North Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-08-10

    ... Code (NCAC), Subchapter 2D .0530, subsections (a), (b), (g), (i), (u), and (v) (from North Carolina's... and Promulgation of Implementation Plans North Carolina: Prevention of Significant Deterioration and...: EPA is taking final action to approve revisions to the North Carolina State Implementation Plan (SIP...

  9. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  10. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans

    International Nuclear Information System (INIS)

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-01-01

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3 mm distance

  11. Towards Implementation of Green Technology in Sabah Construction Industry

    Science.gov (United States)

    Azland Jainudin, Noor; Jugah, Ivy; Nasrizal Awang Ali, Awang; Tawie, Rudy

    2017-12-01

    The construction industry in Sabah is one of the major roles for development of social, economic infrastructures and buildings in generating wealth to the state besides the tourism sector. The increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. The objective of the research is to identify the awareness and implementation of green technology in construction industry in Kota Kinabalu, Sabah. The methodology of the research is through distributing the questionnaire to the contractors, developers, consultants, architects and state government agencies to the area in Kota Kinabalu only. The questionnaires had been analysed to find out the mean value. 100 questionnaires distributed to the respondents but merely 85 questionnaires collected have been analysed. Based on the findings, 83.5% organisations were aware with the concept of green technology in construction project. In terms of the implementation only 64.7% had been implemented in their organizations. More than 50% from the major players such as contractors, consultants, developers, architects and state government agencies were aware based on six green technology concepts in their organizations. As a conclusion, the awareness towards green policy concept in construction industry is very satisfied. Meanwhile, in terms of implementation need to be increased the number of organizations to be involved in green technology in construction industry.

  12. Design and Implementation of Regional and Communal Energy Plans

    International Nuclear Information System (INIS)

    Jilek, W.

    1997-01-01

    Local energy planning has become a common thing, particularly after the first oil shock in the year 1973. This kind of planning claims to follow an integrated approach, i.e. to treat not only the economic problems connected with the supply of energy, but also the environmental problems concerned and the questions related to the conservation of resources. In Styria, such ''integrated'' plans have emerged in more than 25 municipalities, so far. Most of these concepts - harmonized with the clearly defined goals and objectives of the province's energy and environmental policy - may be termed a success insofar, as the measures considered therein are already in the process of practical implementation. (author)

  13. Science and technology planning in LDCs: major policy issues

    Energy Technology Data Exchange (ETDEWEB)

    Wionczek, M S

    1979-05-01

    Science in the less-developed countries (LDCs) should be underplanned rather than overplanned. Furthermore, the planning should be directed to the outer fringes of the scientific endeavor and to its infrastructure and not to the substance of scientific research itself. Planning of applied research and technological development in the LDC is another story. It cannot be done without entering into the substantive problems of applied research and technological development. Attempts to set the broad overall national targets for science and technology (S and T) expenditures -in terms of the proportion of the (GNP) or the per capita income- which do not consider the science and technology system's financial and human resources absorption capacity, are useless. 8 references.

  14. Implementation of an evolutionary algorithm in planning investment in a power distribution system

    Directory of Open Access Journals (Sweden)

    Carlos Andrés García Montoya

    2011-06-01

    Full Text Available The definition of an investment plan to implement in a distribution power system, is a task that constantly faced by utilities. This work presents a methodology for determining the investment plan for a distribution power system under a shortterm, using as a criterion for evaluating investment projects, associated costs and customers benefit from its implementation. Given the number of projects carried out annually on the system, the definition of an investment plan requires the use of computational tools to evaluate, a set of possibilities, the one that best suits the needs of the present system and better results. That is why in the job, implementing a multi objective evolutionary algorithm SPEA (Strength Pareto Evolutionary Algorithm, which, based on the principles of Pareto optimality, it deliver to the planning expert, the best solutions found in the optimization process. The performance of the algorithm is tested using a set of projects to determine the best among the possible plans. We analyze also the effect of operators on the performance of evolutionary algorithm and results.

  15. The planning cycle.

    Science.gov (United States)

    Johnson, William

    2005-01-01

    Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.

  16. Readiness of hospitals affiliated with Shiraz university of medical sciences for implementation of radio frequency identification technology

    Directory of Open Access Journals (Sweden)

    Saeid Ebrahimi

    2015-10-01

    the budget, improve the technical and communicative infrastructures, and also plan to implement this technology

  17. Implementation of information and communication technologies for health in Bangladesh.

    Science.gov (United States)

    Islam, Sheik Mohammed Shariful; Tabassum, Reshman

    2015-11-01

    Bangladesh has yet to develop a fully integrated health information system infrastructure that is critical to guiding policy development and planning. Initial pilot telemedicine and eHealth programmes were not coordinated at national level. However, in 2011, a national eHealth policy was implemented. Bangladesh has made substantial improvements to its health system. However, the country still faces public health challenges with limited and inequitable access to health services and lack of adequate resources to meet the demands of the population. In 2008, eHealth services were introduced, including computerization of health facilities at sub-district levels, internet connections, internet servers and an mHealth service for communicating with health-care providers. Health facilities at sub-district levels were provided with internet connections and servers. In 482 upazila health complexes and district hospitals, an mHealth service was set-up where an on-duty doctor is available for patients at all hours to provide consultations by mobile phone. A government operated telemedicine service was initiated and by 2014, 43 fully equipped centres were in service. These centres provide medical consultations by qualified physicians to patients visiting rural and remote community clinics and union health centres. Despite early pilot interventions and successful implementation, progress in adopting eHealth strategies in Bangladesh has been slow. There is a lack of common standards on information technology for health, which causes difficulties in data management and sharing among different databases. Limited internet bandwidth and the high cost of infrastructure and software development are barriers to adoption of these technologies.

  18. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  19. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  20. Plans & Policies for Technology in Education: A Compendium. A Technology Leadership Network Special Report.

    Science.gov (United States)

    National School Boards Association, Alexandria, VA. Inst. for the Transfer of Technology to Education.

    This document shows how education leaders nationwide--many of them part of the National School Boards Association's 345-district Technology Leadership Network--have addressed technology-related policy issues such as copyright, purchasing, network/Internet use, and ethics as well as technology planning topics including staff development, classroom…

  1. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  2. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  3. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  4. Theoretic models for recommendation and implementation of assistive technology

    Directory of Open Access Journals (Sweden)

    Ana Cristina de Jesus Alves

    2016-07-01

    Full Text Available Introduction: The latest international researches seek to understand the factors affecting the successful use of assistive technology devices through studies regarding the assessments systematizing; abandonment of devices; or theoric models that consider the aspects of those devices implementation. In Brazil the researches are focused on developing new technologies and there are still not sufficient studies related to the successful use of devices and ways of assistive technology implementation. Objective: To identify conceptual models used for indication and implementation of assistive technology devices. Method: Literature review. The survey was conducted in six databases: CINAHAL, Eric, GALE, LILACS, MEDLINE e PsycInfo. A critical analysis described by Grant and Booth was used. Results: There are no records of a Brazilian survey and among 29 selected articles, 17 conceptual models used in the area of AT were found; of these, 14 were specific to AT. The results showed that the new conceptual models of TA are under development and the conceptual model “Matching Person and Technology – MPT” was the most mentioned. Conclusion: We can observe that the practices related to TA area in international context shows a correlation with conceptual models, thus, we hope this study might have the capacity to contribute for the propagation of this precepts at national level

  5. A Needs Analysis for Technology Integration Plan: Challenges and Needs of Teachers

    Science.gov (United States)

    Vatanartiran, Sinem; Karadeniz, Sirin

    2015-01-01

    Lack of technology leadership and technology integration plans are important obstacles for using technology effectively in schools. We carried out a large-scale study to be able to design a technology integration plan for one of the pilot provinces that Fatih Project was initiated. The purpose of this research is to examine the perceived…

  6. Challenges in Implementing Emission Mitigation Technologies in Indonesia Agricultural Sector: Criticizing the Available Mitigation Technologies

    Directory of Open Access Journals (Sweden)

    Malahayati Marissa

    2018-03-01

    Full Text Available Reduction of Green House Gas (GHG emissions in the agricultural sector is the main target for reducing non-CO2 emissions. In Indonesia, the agricultural sector is the third largest GHG emitter, far behind that from Land Use Change and Forestry (LUCF and the energy sector. However, the agricultural sector is the biggest contributor of non-CO2 emissions and is also the most vulnerable sector to climate change. The Indonesian government is committed to reduce total emission inform current levels by 29% by 2030 under Nationally Determined Contribution (NDC. This will require reductions in emissions from all sectors including agriculture. Several mitigation technologies have been recommended by UNFCCC for implementation such as replacing urea with ammonium sulfate fertilizer; replacing nitrogen fertilizer with multicontent fertilizer; water irrigation management; replacing roughage with concentrate as livestock feed; and building biogas digesters. From our Computer General Equilibrium (CGE simulation, if the focus of mitigation technology implementation in agriculture is to reduce non-CO2 emissions gases such as CH4 and N2O, then a comprehensive approach is needed. If the government implements the technology partially, we predict there will be a trade-off between CH4 and N2O emission. However, our simulation shows the loss to GDP caused by a new emission mitigation policy is very high even though Indonesia has invested for mitigation technology in agriculture. This is because we consider the additional investment needed will be costly and some technologies may not be suitable for implementation in Indonesia. In this research, we review current literature and examine each technology and its cost and compatibility with Indonesian situations in order to make policy recommendations for implementation by the Indonesia government.

  7. Implementation Plan for a Common Nordic Retail Market. Evaluation of the responses on the public consultation

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan

  8. Advanced Education and Technology Business Plan, 2008-11

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2008

    2008-01-01

    The Ministry of Advanced Education and Technology's 2008-11 business plan identifies how it plans to work over the next three years to enhance advanced learning opportunities and innovation for all Albertans. Alberta's advanced learning system is composed of public board-governed institutions, the apprenticeship and industry training system,…

  9. An Examination of Family Physicians Plan Implementation in Rural ...

    African Journals Online (AJOL)

    Razieh Mirzaeian

    recognizing the advantages and disadvantages of this Plan based ... physicians and health care managers and employees working in the Borujen town (n=62). ..... Nworie J. Using the Delphi technique in educational technology research.

  10. Ethical considerations regarding the implementation of new technologies and techniques in surgery.

    Science.gov (United States)

    Strong, Vivian E; Forde, Kenneth A; MacFadyen, Bruce V; Mellinger, John D; Crookes, Peter F; Sillin, Lelan F; Shadduck, Phillip P

    2014-08-01

    Ethical considerations relevant to the implementation of new surgical technologies and techniques are explored and discussed in practical terms in this statement, including (1) How is the safety of a new technology or technique ensured?; (2) What are the timing and process by which a new technology or technique is implemented at a hospital?; (3) How are patients informed before undergoing a new technology or technique?; (4) How are surgeons trained and credentialed in a new technology or technique?; (5) How are the outcomes of a new technology or technique tracked and evaluated?; and (6) How are the responsibilities to individual patients and society at large balanced? The following discussion is presented with the intent to encourage thought and dialogue about ethical considerations relevant to the implementation of new technologies and new techniques in surgery.

  11. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  12. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  13. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  14. Advanced Education and Technology Business Plan, 2010-13

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2010

    2010-01-01

    This paper presents the business plan of the Ministry of Advanced Education and Technology for 2010 to 2013. Advanced Education and Technology supports the advanced learning system by providing funding for advanced learning providers, coordinating and approving programs of study at public institutions, licensing and approving programs at private…

  15. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    Science.gov (United States)

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  16. Designing and Implementing an Assistive Technology Lab for Postsecondary Education

    Science.gov (United States)

    Jones, Beth; Williams, Nichole; Rudinger, Belinda

    2018-01-01

    A literature review discusses how teacher knowledge of assistive technology significantly impacts student success with assistive technology and that many teachers enter the field feeling unprepared to implement these technologies with students. This article explores one university's process in setting up an assistive technology laboratory for…

  17. Innovation in Construction: Learning Processes in implementing new Technologies

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is concerned with the question: How do construction firms implement new technology on construction projects? A model of the implementation process is presented based on a review of the construction innovation literature, innovation theory, and organisational learning theories....

  18. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  19. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  20. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  1. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  2. Field test plan: Buried waste technologies, Fiscal Year 1995

    International Nuclear Information System (INIS)

    Heard, R.E.; Hyde, R.A.; Engleman, V.S.; Evans, J.D.; Jackson, T.W.

    1995-06-01

    The US Department of Energy, Office of Technology Development, supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that, when integrated with commercially available baseline technologies, form a comprehensive remediation system for the effective and efficient remediation of buried waste. The Fiscal Year 1995 effort is to deploy and test multiple technologies from four functional areas of buried waste remediation: site characterization, waste characterization, retrieval, and treatment. This document is the basic operational planning document for the deployment and testing of the technologies that support the field testing in Fiscal Year 1995. Discussed in this document are the scope of the tests; purpose and objective of the tests; organization and responsibilities; contingency plans; sequence of activities; sampling and data collection; document control; analytical methods; data reduction, validation, and verification; quality assurance; equipment and instruments; facilities and utilities; health and safety; residuals management; and regulatory management

  3. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    Science.gov (United States)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  4. Energy Technology Initiatives 2013. Implementation through Multilateral Co-operation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-01

    Ensuring energy security and addressing climate change cost-effectively are key global challenges. Tackling these issues will require efforts from stakeholders worldwide. To find solutions, the public and private sectors must work together, sharing burdens and resources, while at the same time multiplying results and outcomes. Through its broad range of multilateral technology initiatives (Implementing Agreements), the IEA enables member and non-member countries, businesses, industries, international organisations and non-governmental organisations to share research on breakthrough technologies, to fill existing research gaps, to build pilot plants and to carry out deployment or demonstration programmes across the energy sector. This publication highlights the most significant recent achievements of the IEA Implementing Agreements. At the core of the IEA energy technology network, these initiatives are a fundamental building block for facilitating the entry of new and improved energy technologies into the marketplace.

  5. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  6. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  7. Collaboration process for integrated social and health care strategy implementation

    Directory of Open Access Journals (Sweden)

    Jukka Korpela

    2012-05-01

    Full Text Available Objective:  To present collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS.Method: A case study done in the South Karelia District of Social and Health Services in Finland during 2010 - 2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study.Results: As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed.Conclusions: The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  8. Collaboration process for integrated social and health care strategy implementation.

    Science.gov (United States)

    Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku

    2012-01-01

    To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  9. KSC Education Technology Research and Development Plan

    Science.gov (United States)

    Odell, Michael R. L.

    2003-01-01

    Educational technology is facilitating new approaches to teaching and learning science, technology, engineering, and mathematics (STEM) education. Cognitive research is beginning to inform educators about how students learn providing a basis for design of more effective learning environments incorporating technology. At the same time, access to computers, the Internet and other technology tools are becoming common features in K-20 classrooms. Encouraged by these developments, STEM educators are transforming traditional STEM education into active learning environments that hold the promise of enhancing learning. This document illustrates the use of technology in STEM education today, identifies possible areas of development, links this development to the NASA Strategic Plan, and makes recommendations for the Kennedy Space Center (KSC) Education Office for consideration in the research, development, and design of new educational technologies and applications.

  10. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  11. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  12. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... a State Implementation Plan (SIP) submittal from the State of New Mexico to address Clean Air Act (CAA or Act) requirements that prohibit air emissions which will contribute significantly to...

  13. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  14. Trends in Technology Planning and Funding in Florida K-12 Public Schools

    Directory of Open Access Journals (Sweden)

    ALBERT DIETER RITZHAUPT

    2008-12-01

    Full Text Available This empirical research investigates trends in technology planning and funding in Florida’s K–12 public schools between the 2003–04 and 2005–06 academic years. Survey items that focused on funding and planning issues on Florida’s statewide school technology integration survey were analyzed using logistic models. Results indicate a significant increase in the number of schools revising their technology plans on a regular basis; a significant increase in the frequency with which Florida’s K–12 public schools are seeking funding for technology-related initiatives; a significant increase in parent, administrator, teacher, and student involvement in the technology planning process; and a significant decline in adequate funding for software and hardware needs. In addition, schools with low proportions of economically disadvantaged students sought and were awarded significantly more funds from donations and federal and state grants. Implications for educational leadership and policy are provided.

  15. Implementation of enterprise resource planning systems: a user perspective

    Science.gov (United States)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  16. Implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Bullock, M.G.; Rodriguez, R.R.

    1987-05-01

    This document presents the current implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory. Information contained in this report was also included in several Department of Energy (DOE) planning documents for the Defense Transuranic Waste Program. This information can be found in the following DOE documents: Comprehensive Implementation Plan for the DOE Defense Buried TRU Waste Program; Defense Waste Management Plan for Buried Transuranic-Contaminated Waste, Transuranic-Contaminated Waste, Transuranic-Contaminated Soil, and Difficult-to-Certify Transuranic Waste; and Defense Special-Case Transuranic Waste Implementation Plan. 11 refs

  17. Examining Health Information Technology Implementation Success Factors in Critical Access Hospitals

    Science.gov (United States)

    Monkman, Blake D.

    2016-01-01

    As the role of information technology increases throughout the world, healthcare providers in the United States face industry and governmental pressures to implement health information technology (HIT) as a tool to improve healthcare costs, quality, and safety. The problem addressed in this study was the relatively low HIT implementation success…

  18. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  19. 77 FR 64445 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0541; FRL 9733-5] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... Illinois State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located...

  20. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  1. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  2. 77 FR 24440 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0021(b); FRL-9661-9] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... 2002 base year emissions inventory portion of the state implementation plan (SIP) revision submitted by...

  3. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9243-1] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading of Allowances...

  4. Integrated Motion Planning and Autonomous Control Technology for Autonomous ISR, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI and MIT propose to design, implement and test a comprehensive Integrated Mission Planning \\ (ii) Develop, Implement (iii) Develop, Implement and (iii) Carry...

  5. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9226-3] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking...

  6. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    Science.gov (United States)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  7. Examining Technology, Structure and Identity During an Enterprise System Implementation

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez, Rosio

    2008-11-12

    This paper presents a longitudinal study of an Enterprise System (ES) implementation by critically examining the discursive context in which an ES implementation unfolds. The findings show that users strongly supported the ES in the earlier stage of implementation when the technology was an imaginary phenomenon. However, in later stages, when the technology is in use, user support was not consistent. In this phase the ES produces loss of control and an inability to function as an arbiter of fairness (in allocating resources associated with the system) thereby directly challenging existing professional identities and roles. These outcomes, in turn, generate acts of resistance on the part of workers. Users reach inside the technology and reshape it by devising creative workarounds that produce a sense of reskilling to counter the deskilling produced by the loss of control and power. The analysis also shows that an ES is a complex social phenomenon that is intricately linked to and complicit in shaping organizational structure and identity. In particular this study shows how technology, structure, and identity are in a mutually constitutive relationship.

  8. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  9. Variable Cycle Engine Technology Program Planning and Definition Study

    Science.gov (United States)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  10. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  11. National rf technology research and development program plan

    International Nuclear Information System (INIS)

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data

  12. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  13. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation

    International Nuclear Information System (INIS)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-01-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  14. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  15. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  16. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  17. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  18. Practicing Technology Implementation: The Case of an Enterprise System

    Science.gov (United States)

    Awazu, Yukika

    2013-01-01

    Drawing on four theories of practice--Communities of Practice (CoP), Bourdieu's theory of practice, Pickering's mangle of practice, and Actor Network Theory (ANT), the study provides an in-depth understanding about technology implementation practice. Analysis of an Enterprise System implementation project in a software manufacturing…

  19. Implementing Cleaner Printed Wiring Board Technologies: Surface Finishes

    Science.gov (United States)

    This document describes the problems, solutions, and time and effort involved in implementing alternative surface finish technologies, and this guide is produced as part of the DfE Printed Wiring Board Project

  20. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  1. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  2. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  3. Medical technology management: from planning to application.

    Science.gov (United States)

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  4. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  5. Implementation of RFID Technology in University of Pune Library

    Science.gov (United States)

    Bansode, Sadanand Y.; Desale, Sanjay K.

    2009-01-01

    Purpose: The purpose of this paper is to describe the implementation of a radio frequency identification (RFID) system in Pune University Library. Design/methodology/approach: The paper provides a brief overview of background of the project, barriers faced and changes that have been experienced after the implementation of the technology. Findings:…

  6. Implementing PlanCheyenne: Strategies and Opportunities for Smarter Growth in Cheyenne

    Science.gov (United States)

    This report is from a technical assistance project with Cheyenne, WY, to identify policy options that would implement PlanCheyenne and illustrate development that would help to achieve the community's goals.

  7. Intranet implementation in a context of Web technology discovery

    OpenAIRE

    Asnawi, Amrullah

    1999-01-01

    Approved for public release; distribution is unlimited This thesis presents a model of intranet implementation for a military facility within the context of an organization that is in the process of discovering Web technology and the browser as a central communication application. It surveys the genesis and evolution of intranet technology, examines the interface between emerging technology and organizational culture, specifies software and hardware components, and offers recommendations o...

  8. Technologies for life

    International Nuclear Information System (INIS)

    Kerner, J.

    2006-01-01

    In this video-film technologies applied in the BIONT, a. s. are presented. Production of radionuclides and radiopharmaceuticals as well as principles of positron emission tomography and diagnostic using is explained. Other technologies implemented and planned in the Cyclotron Center of the Slovak Republic are presented.

  9. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    Science.gov (United States)

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  10. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  11. An algorithmic interactive planning framework in support of sustainable technologies

    Science.gov (United States)

    Prica, Marija D.

    This thesis addresses the difficult problem of generation expansion planning that employs the most effective technologies in today's changing electric energy industry. The electrical energy industry, in both the industrialized world and in developing countries, is experiencing transformation in a number of different ways. This transformation is driven by major technological breakthroughs (such as the influx of unconventional smaller-scale resources), by industry restructuring, changing environmental objectives, and the ultimate threat of resource scarcity. This thesis proposes a possible planning framework in support of sustainable technologies where sustainability is viewed as a mix of multiple attributes ranging from reliability and environmental impact to short- and long-term efficiency. The idea of centralized peak-load pricing, which accounts for the tradeoffs between cumulative operational effects and the cost of new investments, is the key concept in support of long-term planning in the changing industry. To start with, an interactive planning framework for generation expansion is posed as a distributed decision-making model. In order to reconcile the distributed sub-objectives of different decision makers with system-wide sustainability objectives, a new concept of distributed interactive peak load pricing is proposed. To be able to make the right decisions, the decision makers must have sufficient information about the estimated long-term electricity prices. The sub-objectives of power plant owners and load-serving entities are profit maximization. Optimized long-term expansion plans based on predicted electricity prices are communicated to the system-wide planning authority as long-run bids. The long-term expansion bids are cleared by the coordinating planner so that the system-wide long-term performance criteria are satisfied. The interactions between generation owners and the coordinating planning authority are repeated annually. We view the proposed

  12. 77 FR 54163 - Health Information Technology: Standards, Implementation Specifications, and Certification...

    Science.gov (United States)

    2012-09-04

    ... Health Information Technology: Standards, Implementation Specifications, and Certification Criteria for... Health Information Technology AGENCY: Office of the National Coordinator for Health Information... information technology, including changing the program's name to the ONC HIT Certification Program. DATES...

  13. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  14. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  15. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  16. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  17. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  18. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  19. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  20. 76 FR 55541 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia: Kentucky; Ohio...

    Science.gov (United States)

    2011-09-07

    ... Cabell and Wayne Counties in their entireties and a portion of Mason County (Graham Tax District) in West... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S...

  1. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  2. Marketing Plan for the National Security Technology Incubator

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-03-31

    This marketing plan was developed as part of the National Security Preparedness Project by the Arrowhead Center of New Mexico State University. The vision of the National Security Technology Incubator program is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety and security. The plan defines important aspects of developing the incubator, such as defining the target market, marketing goals, and creating strategies to reach the target market while meeting those goals. The three main marketing goals of the incubator are: 1) developing marketing materials for the incubator program; 2) attracting businesses to become incubator participants; and 3) increasing name recognition of the incubator program on a national level.

  3. Use of technology to support information needs for continuity of operations planning in public health: a systematic review.

    Science.gov (United States)

    Reeder, Blaine; Turner, Anne; Demiris, George

    2010-01-01

    Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.

  4. The strategy of the shelter implementation plan (SIP) performance

    International Nuclear Information System (INIS)

    Geras'ko, V.N.; Nosovskij, A.V.

    1999-01-01

    In 1997 the 'Shelter Implementation Plan' (SIP) was developed it's purpose was to transform Unit 4 of the Chernobyl NPP into the ecologically safe system. The Plan was developed by common efforts of the Ukrainian scientists, CES representatives and experts from the United States of America. The fact that there are no nuclear and radiation safety criteria for the projects will result into the situation when different designers might use within the various project tasks various design criteria. Till now o exact date for the constructions stabilization activities has been defined, and it creates a kind of on definiteness while developing the Radioactive Waste Management strategy and Safe Confinement

  5. 77 FR 51619 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2012-08-24

    ... technology was or was not cost effective. The BART Guidelines do not set a numerical definition for ``cost... include public health costs related to air pollution and the negative impacts to tourism resulting from... quantify benefits to health or tourism. Moreover, an analysis of health and tourism benefits is unlikely to...

  6. U.S. Department of Energy, Richland Operations Office Environmental Protection Implementation Plan, November 9, 1994 to November 9, 1995

    International Nuclear Information System (INIS)

    1994-11-01

    The defence production mission at the Hanford Sites has ceased, and treatment, storage, and disposal of existing waste and cleanup of the waste sites is now the major effort. Hanford Site's current mission is focused on three mission elements: site cleanup; technology development; economic diversification. The goal of US DOE is to clean up waste sites at the Hanford Reservation and bring the facilities into compliance with federal, state, and local environmental laws by 2028. This document provides information about the environmental protection implementation plan

  7. New technologies in the implementation of interbudgetary relations

    Directory of Open Access Journals (Sweden)

    N. M. Baklaeva

    2017-01-01

    Full Text Available The formation of the digital economy and the structure of the new points of economic growth takes place in Russia in the face of many challenges internal and external. Among questions of the budgetary perspective the special relevance is taken shape and methods of realization of the principles of the budgetary federalism in the sphere of the interbudgetary relations. The purposes of work consist in search of new technologies of development of interbudgetary relations in the context of the formation of the digital economy. Based on the analysis of the observed new trends in the dynamic indicators of intergovernmental transfers as one of the main tools for implementation of fiscal federalism, and the dynamics of the gross regional product, it is determined that the close linear relationship between them is missing. Analytical and theoretical results of the study showed that the existing system of interbudgetary relations does not promote objective economic conditions for independence of territorial budgets for execution of revenue and expenditure powers. The obtained results can be used to develop new technological bases of system of interbudgetary relations in the formation of the digital economy. For the effective development of interbudgetary relations in modern conditions it is expedient at the national level to develop and begin implementation of the project for implementation in daily practice of intergovernmental relations blockchain technology. Despite the fact that the blockchain technology is in an early stage of its development, however, it carries great potential for global change principles of functioning of many spheres of life. This, potentially, could become one of the leading projects of strategic national socio-economic development.

  8. Planning to break unwanted habits: habit strength moderates implementation intention effects on behaviour change.

    Science.gov (United States)

    Webb, Thomas L; Sheeran, Paschal; Luszczynska, Aleksandra

    2009-09-01

    Implementation intention formation promotes effective goal striving and goal attainment. However, little research has investigated whether implementation intentions promote behaviour change when people possess strong antagonistic habits. Experiment 1 developed relatively habitual responses that, after a task switch, had a detrimental impact on task performance. Forming an if-then plan reduced the negative impact of habit on performance. However, the effect of forming implementation intentions was smaller among participants who possessed strong habits as compared to participants who had weaker habits. Experiment 2 provided a field test of the role of habit strength in moderating the relationship between implementation intentions and behaviour in the context of smoking. Implementation intentions reduced smoking among participants with weak or moderate smoking habits, but not among participants with strong smoking habits. In summary, habit strength moderates the effectiveness of if-then plan formation in breaking unwanted habits.

  9. Analysing Models as a Knowledge Technology in Transport Planning

    DEFF Research Database (Denmark)

    Gudmundsson, Henrik

    2011-01-01

    critical analytic literature on knowledge utilization and policy influence. A simple scheme based in this literature is drawn up to provide a framework for discussing the interface between urban transport planning and model use. A successful example of model use in Stockholm, Sweden is used as a heuristic......Models belong to a wider family of knowledge technologies, applied in the transport area. Models sometimes share with other such technologies the fate of not being used as intended, or not at all. The result may be ill-conceived plans as well as wasted resources. Frequently, the blame...... device to illuminate how such an analytic scheme may allow patterns of insight about the use, influence and role of models in planning to emerge. The main contribution of the paper is to demonstrate that concepts and terminologies from knowledge use literature can provide interpretations of significance...

  10. Implementing Digital Storytelling as a Technology Integration Approach with Primary School Children

    Directory of Open Access Journals (Sweden)

    Nuala Sweeney-Burt

    2014-06-01

    Full Text Available Irish educational policy acknowledges the importance of integrating technology meaningfully into teaching and learning at the primary level. Much remains to be done, however, in terms of developing, practically implementing and evaluating the use of technology in the Irish primary classroom. This paper describes a study on the use of a structured approach to digital storytelling as a tool for meaningful technology integration with children at primary level. In this study, the researcher developed a structured approach for implementing digital storytelling with primary school children, and collaborated with a class teacher in an Irish primary school to prepare to implement the approach. Multiple qualitative methods were used to evaluate the implementation, including interviews with the teacher, classroom observation, and focus group interviews with participating children. The results suggested that this structured approach to digital storytelling has the potential to be used successfully as a meaningful technology integration approach with this cohort. The findings also explored implications for the implementation of digital storytelling at primary level, and identified aspects on which further research should be undertaken to enhance and extend the approach that was used.

  11. DETERMINATION OF DIVERSITY OF THE WORKSTATUSES IN THE IMPLEMENTATION PROCESS

    Directory of Open Access Journals (Sweden)

    TKACH T. V.

    2017-05-01

    Full Text Available Raising of problem. Implementation of the plans is accompanied by an increase in the uncertainty of the state of the production system, which largely depends on the organizational and technological decisions laid down in the calendar plan at the stage of its development. Determining the changes in the diversity of the system statuses, in terms of the implementation stages of the plan, will allow to outline the likely crisis periods and to prepare for them in advance. In accordance with this, research in the field of improving of the methodology for developing the calendar plans in order to expand of the factors on which its feasibility is assessed, determines the relevance of this work. Purpose of the article. To determine the impact of organizational and technological decisions of the calendar plan on the appearance of parametric failures of a separate work. Conclusion. A methodology for calculating the dynamics of the diversity of possible statuses the process of the eхecuting of a separate work, to monitor the intensity of the increase in the uncertainty of the system status by the stages of the implementation of the calendar plan.

  12. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  13. 77 FR 23622 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... approving into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure Properties LLC..., known as the eight pound per hour (8 lb/ hr) rule, for volatile organic matter, for Leisure Properties...

  14. 77 FR 23652 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0944; FRL-9648-7] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... proposing to approve into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure...

  15. 77 FR 42686 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year...

    Science.gov (United States)

    2012-07-20

    ... Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year Inventory AGENCY: Environmental... matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State Implementation Plan... National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM 2.5...

  16. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  17. Pros and cons of healthcare information technology implementation: the pros win.

    Science.gov (United States)

    Maffei, Roxana

    2006-01-01

    Countless studies and investigations have been performed siding either for or against the implementation of technology in the healthcare setting. This article presents both sides of this debate, with an obvious conclusion that the pros of this debate win. The practice of information technology in the medical domain lags behind its knowledge and discovery by at least 7 years. The key to closing this gap is to show, through various studies, how information technology systems provide decision support to users at the point in time when decisions are needed. What the reader will obtain from this article is that the pros for information technology implementation in healthcare settings weigh much more and have a greater effect than the cons.

  18. IMPLEMENTING FRANCHISING INTO A BUSINESS. : Based on my own business plan.

    OpenAIRE

    Krzyzaniak, Patryk

    2016-01-01

    The aim of the thesis is to successfully implement a business system based on franchising into the author's own business. The thesis will provide information about the actual busi-ness plan, theoretical and practical investigation on how franchising would efficiently work in the Finnish market, basic principles of cooperation on a franchise basis, categories of fran-chising (in general and in cooperation with the author's business plan), advantages and dis-advantages of having franchising as ...

  19. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  20. High-level waste management technology program plan

    International Nuclear Information System (INIS)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs

  1. Strategic Planning Tools for Large-Scale Technology-Based Assessments

    Science.gov (United States)

    Koomen, Marten; Zoanetti, Nathan

    2018-01-01

    Education systems are increasingly being called upon to implement new technology-based assessment systems that generate efficiencies, better meet changing stakeholder expectations, or fulfil new assessment purposes. These assessment systems require coordinated organisational effort to implement and can be expensive in time, skill and other…

  2. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0021;EPA-R05-OAR-2013-0022; FRL-9812-3] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter... Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual fine...

  3. Implementation of renewable energy technologies - Opportunities and barriers. Egypt country study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The project used case studies of renewable energy implementation projects to analyse the reasons for success or failure of specific projects or technologies. In particular the study aimed to identify possibilities for 'removing' the main barriers and thus 'promoting' increased implementation of (RETs), and to 'generalise' the experiences from the case studies and produce results that can be disseminated and utilized further in a planned second phase. The specific objectives for Egypt Country Study were: 1) To determine, on the basis of analysis of the past experience, the barriers against implementation of RETs in Egypt, and to identify the favourable conditions and actions required for such implementation. 2) To apply the knowledge gained and results of the analysis of past projects for a detailed analysis of barriers to a chosen set of potential RETs implementation projects with view to success. 3) To identify specific RET projects for implementation including necessary actions to overcome identified barriers. The case study revealed that; for Domestic Solar Water Heating (DSWH) the main barriers are; the economic barriers followed by the awareness / information barriers, then the Technical and Institution barriers. For the PV rural electrification, the most important barriers are; the economic and financial barriers, the awareness and information barriers then the technical barriers. For the large-scale biogas systems, the main barriers are the institution and capacity, economic, policy and awareness / information respectively. According to the project results the main actions that could be taken to overcome the barriers and make use of the available opportunities are: Economic / Financial: 1) Creation of new financial schemes for the RETs applications components and systems. 2) Reducing the taxes and duties for the components and / or materials needed for Renewable Energy (RE) systems. 3) More government-supported market incentives to encourage further

  4. Implementation of renewable energy technologies - Opportunities and barriers. Egypt country study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The project used case studies of renewable energy implementation projects to analyse the reasons for success or failure of specific projects or technologies. In particular the study aimed to identify possibilities for 'removing' the main barriers and thus 'promoting' increased implementation of (RETs), and to 'generalise' the experiences from the case studies and produce results that can be disseminated and utilized further in a planned second phase. The specific objectives for Egypt Country Study were: 1) To determine, on the basis of analysis of the past experience, the barriers against implementation of RETs in Egypt, and to identify the favourable conditions and actions required for such implementation. 2) To apply the knowledge gained and results of the analysis of past projects for a detailed analysis of barriers to a chosen set of potential RETs implementation projects with view to success. 3) To identify specific RET projects for implementation including necessary actions to overcome identified barriers. The case study revealed that; for Domestic Solar Water Heating (DSWH) the main barriers are; the economic barriers followed by the awareness / information barriers, then the Technical and Institution barriers. For the PV rural electrification, the most important barriers are; the economic and financial barriers, the awareness and information barriers then the technical barriers. For the large-scale biogas systems, the main barriers are the institution and capacity, economic, policy and awareness / information respectively. According to the project results the main actions that could be taken to overcome the barriers and make use of the available opportunities are: Economic / Financial: 1) Creation of new financial schemes for the RETs applications components and systems. 2) Reducing the taxes and duties for the components and / or materials needed for Renewable Energy (RE) systems. 3) More government-supported market incentives

  5. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  6. Plan to research and technological development for radioactive waste management 1999-2003

    International Nuclear Information System (INIS)

    2000-01-01

    This in turn means a change in the orientation of the R and D that ENRESA has been performing to date, the first step in this direction being the current Plan, which will cover the period 1999-2003. On the basis of the above, and closely tracking the progress mode and the situation existing in the other countries of the OECD and EU involved in similar programmes, the new R and D Plan includes a series of areas of research that cover all the internationally considered radioactive waste management options and alternatives. These include R and D activities that range from the exhaustive treatment of irradiated fuels (advanced reprocessing and transmutation) to the direct storage of spent fuel (open cycle). The latter was the only option considered in previous R and D Plans, which proposed the construction of a deep geological disposal facility by around the year 2025. As has been pointed out above, this new R and D approach, which implies a wider view of spent fuel management options, including separation and transmutation, along with modulation in budgeting, in order to adopt to a longer time frame for implementation of the possible solutions, is embodied in the new GRWP. The objective and activities considered in this Plan are to make a decisive contribution of the scientific and technological bases supporting future decision-making on the most adequate way of addressing the definitive management of high level wastes. (Author)

  7. Factors related to the implementation and diffusion of new technologies: a pilot study

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    In order to develop an understanding of how government intervention affects the processes of implementation and diffusion of new technologies, case studies of 14 technologies were carried out: automobiles; broadcast radio; frozen foods; black and white TV; color TV; polio vaccine; supersonic transport; fluoridation of water supplies; computer-aided instruction; basic oxygen process for steel; numerical control in manufacturing; digital computers; lasers; and integrated circuit. The key factors, their motivations for implementing/adopting the technology (or not doing so), the interactions among the key factors, and how these affected implementation/adoption are examined.

  8. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  9. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. Planning ten years ahead a multidisciplinary nuclear research technology institute: the case of IPEN

    International Nuclear Information System (INIS)

    Sousa, Willy Hoppe de

    2011-01-01

    Planning is always a problem in government organizations whose mission involves the development of R and D activities. The current issue of the Institute of Energy and Nuclear Research (IPEN), one of the institutes comprising the National Nuclear Energy Commission (CNEN), is to plan the reconciling the long-term ramifications of a large project whose funding is primarily derived from the budget Union with the R and D agenda of IPEN which is largely driven and funded by science and technology funding agencies. This paper aims at reporting the results of one of the stages of the work developed by IPEN to deal with this problem. In mid-2010, top management of IPEN approved the implementation of a participatory planning effort with the following guidelines: (1) focus on two of the three finalist functions of IPEN - Research and Development (R and D) and Products and Services (P and S), (2) results orientation with a time horizon of 10 years, (3) incorporation of the unfolding of a large project in this planning effort (this project has its own planning) and (4) the source of information of the planning process would be the teams involved in the research lines and projects (LPP's) and the lines of production activities (LAP's) - the lowest grouping level in the current planning framework of IPEN. The planning process developed was based on an adaptation of a technique known as technology roadmapping. The data were collected through a web questionnaire. At the end of the data collection in mid- December 2010 89 LPP's and LAP 28's responses were recorded. For the purposes of this article the following groups of information related to R and D finalist function are presented: Where are we now?: (1) Profile of the current team; (2) Motivation of research and (3) Sources used for identification R and D goals. How can we get there?: (4) Profile of research partners, and (5) Profile of the necessary changes. Where do we want to go?: (6) Classification of results by areas and (7

  12. Planning ten years ahead a multidisciplinary nuclear research technology institute: the case of IPEN

    Energy Technology Data Exchange (ETDEWEB)

    Sousa, Willy Hoppe de, E-mail: whsousa@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Gerencia de Planos e Programas

    2011-07-01

    Planning is always a problem in government organizations whose mission involves the development of R and D activities. The current issue of the Institute of Energy and Nuclear Research (IPEN), one of the institutes comprising the National Nuclear Energy Commission (CNEN), is to plan the reconciling the long-term ramifications of a large project whose funding is primarily derived from the budget Union with the R and D agenda of IPEN which is largely driven and funded by science and technology funding agencies. This paper aims at reporting the results of one of the stages of the work developed by IPEN to deal with this problem. In mid-2010, top management of IPEN approved the implementation of a participatory planning effort with the following guidelines: (1) focus on two of the three finalist functions of IPEN - Research and Development (R and D) and Products and Services (P and S), (2) results orientation with a time horizon of 10 years, (3) incorporation of the unfolding of a large project in this planning effort (this project has its own planning) and (4) the source of information of the planning process would be the teams involved in the research lines and projects (LPP's) and the lines of production activities (LAP's) - the lowest grouping level in the current planning framework of IPEN. The planning process developed was based on an adaptation of a technique known as technology roadmapping. The data were collected through a web questionnaire. At the end of the data collection in mid- December 2010 89 LPP's and LAP 28's responses were recorded. For the purposes of this article the following groups of information related to R and D finalist function are presented: Where are we now?: (1) Profile of the current team; (2) Motivation of research and (3) Sources used for identification R and D goals. How can we get there?: (4) Profile of research partners, and (5) Profile of the necessary changes. Where do we want to go?: (6) Classification of

  13. Plan for advanced microelectronics processing technology application

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  14. Implementation of electronic medical records requires more than new software: Lessons on integrating and managing health technologies from Mbarara, Uganda.

    Science.gov (United States)

    Madore, Amy; Rosenberg, Julie; Muyindike, Winnie R; Bangsberg, David R; Bwana, Mwebesa B; Martin, Jeffrey N; Kanyesigye, Michael; Weintraub, Rebecca

    2015-12-01

    Implementation lessons: • Technology alone does not necessarily lead to improvement in health service delivery, in contrast to the common assumption that advanced technology goes hand in hand with progress. • Implementation of electronic medical record (EMR) systems is a complex, resource-intensive process that, in addition to software, hardware, and human resource investments, requires careful planning, change management skills, adaptability, and continuous engagement of stakeholders. • Research requirements and goals must be balanced with service delivery needs when determining how much information is essential to collect and who should be interfacing with the EMR system. • EMR systems require ongoing monitoring and regular updates to ensure they are responsive to evolving clinical use cases and research questions. • High-quality data and analyses are essential for EMRs to deliver value to providers, researchers, and patients. Copyright © 2015 Elsevier Inc. All rights reserved.

  15. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  16. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  17. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  18. Strengthening Government Leadership in Family Planning Programming in Senegal: From Proof of Concept to Proof of Implementation in 2 Districts.

    Science.gov (United States)

    Aichatou, Barry; Seck, Cheikh; Baal Anne, Thierno Souleymane; Deguenovo, Gabrielle Clémentine; Ntabona, Alexis; Simmons, Ruth

    2016-12-23

    Given Senegal's limited resources, the country receives substantial support from externally funded partner organizations to provide family planning and maternal and child health services. These organizations often take a strong and sometimes independent role in implementing interventions with their own structures and personnel, thereby bypassing the government district health system. This article presents findings from the Initiative Sénégalaise de Santé Urbaine (ISSU) (Senegal Urban Health Initiative) that assessed in 2 districts, Diamniadio and Rufisque, the extent to which it was feasible to create stronger government ownership and leadership in implementing a simplified package of family planning interventions from among those previously tested in other districts. The simplified package consisted of both supply- and demand-side interventions, introduced in October 2014 and concluding at the end of 2015. The interventions included ensuring adequate human resources and contraceptive supplies, contraceptive technology updates for providers, special free family planning service days to bring services closer to where people live, family planning integration into other routine services, household visits for family planning education, religious sermons to clarify Islam's position on family planning, and radio broadcasts. District leadership in Diamniadio and Rufisque were actively involved in guiding and implementing interventions, and they also contributed some of their own resources to the project. However, reliance on external funding continued because district budgets were extremely limited. Monitoring data on the number of contraceptive methods provided by district facilities supported by a sister project, the Informed Push Model project, indicate overall improvement in contraceptive provision during the intervention period. In Diamniadio, contraceptive provision increased by 43% between the 6-month period prior to the ISSU interventions (November 2013 through

  19. The EM technology development strategy

    International Nuclear Information System (INIS)

    Frank, C.W.; Barainca, M.; Kubo, A.S.

    1992-01-01

    The Office of Technology Development (TD) supports research and development of technologies that will lower cost, reduce risk, improve safety, and accelerate cleanup of the Nuclear Weapons Complex and provide solutions to currently untractable environmental problems. The TD strategic plan outlines Applied Research, Development, Demonstration, Testing, and Evaluation (RDDT and E) that will provide needed technology products to be used by Environmental Restoration and Waste Management operations (i.e., our customers). The TD strategic plan is derived from EM Goals, Objectives, and Strategy and is incorporated into DOE'S Five-Year Plan for Environmental Restoration and Waste Management. The TD strategic plan is developed based on integrating customer requirements, and is complemented by a top-down, bottom-up analysis of Site Specific Technology Needs and environmental problems. The execution of TD's strategic plan is implemented largely through Integrated Programs (IP) and Integrated Demonstrations (ID). IDs have proven to be a cost-effective method of managing technology development, testing and evaluation, and implementation of successful technology systems into the DOE Environmental Restoration and Waste Management Programs. The Savannah River ID for Volatile Organic Compounds (VOCs) in Saturated Soils resulted in a 51 percent cost savings over stand-alone demonstrations, saving over $8 million. The IPs and IDs are selected based on customer needs, technical complexity, and complex-wide regulatory and compliance agreements. New technology systems are selected for incorporation into an IP or ID from offerings of the DOE laboratories, industry, and the universities. A major TD initiative was announced in August 1991, with the release of a Program Research and Development Announcement (PRDA) requesting industry and universities to propose innovative new technologies to clean up the Weapons Complex. (author)

  20. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  1. Achieving Outcomes With Innovative Smart Pump Technology: Partnership, Planning, and Quality Improvement.

    Science.gov (United States)

    Lehr, Jennifer; Vitoux, Rachel R; Zavotsky, Kathleen Evanovich; Pontieri-Lewis, Vicky; Colineri, Lori

    2018-04-09

    A 5-time designated Magnet academic medical center partnered with its infusion systems supplier to successfully integrate 1327 smart pumps across 45 departments with an aggressive 3-month timeline. The team also achieved quality improvement (QI) outcomes through increased drug library compliance and decreased alerts with their new technology. This large academic medical center needed to implement innovative wireless infusion pump technology in a short time frame. The approach involved a strong partnership from the medical center and the supplier, with extensive planning and collaboration among the clinical nurse specialists and consultants from both organizations to accomplish QI goals. Lean principles were also followed to enhance efficiency and accountability. Quality improvement outcomes included 100% drug library compliance across all 6 intensive care units, a decrease in pump alert rates from 4.18% to 0.79%, and a decrease in pump programming correction rate from 0.36% to 0.06%. A partnership led to a large implementation being completed efficiently across an academic medical center. Through these joint efforts, quality of care was improved within a short period of time.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited. The work cannot be changed in any way or used commercially without permission from the journal.

  2. Improving quality through effective implementation of information technology in healthcare.

    Science.gov (United States)

    Øvretveit, John; Scott, Tim; Rundall, Thomas G; Shortell, Stephen M; Brommels, Mats

    2007-10-01

    To describe an implementation of one information technology system (electronic medical record, EMR) in one hospital, the perceived impact, the factors thought to help and hinder implementation and the success of the system and compare this with theories of effective IT implementation. To draw on previous research, empirical data from this study is used to develop IT implementation theory. Qualitative case study, replicating the methods and questions of a previously published USA EMR implementation study using semi-structured interviews and documentation. Large Swedish teaching hospital shortly after a merger of two hospital sites. Thirty senior clinicians, managers, project team members, doctors and nurses. The Swedish implementation was achieved within a year and for under half the budget, with a generally popular EMR which was thought to save time and improve the quality of patient care. Evidence from this study and findings from the more problematic USA implementation case suggests that key factors for cost effective implementation and operation were features of the system itself, the implementation process and the conditions under which the implementation was carried out. There is empirical support for the IT implementation theory developed in this study, which provides a sound basis for future research and successful implementation. Successful implementation of an EMR is likely with an intuitive system, requiring little training, already well developed for clinical work but allowing flexibility for development, where clinicians are involved in selection and in modification for their department needs and where a realistic timetable is made using an assessment of the change-capability of the organization. Once a system decision is made, the implementation should be driven by top and departmental leaders assisted by competent project teams involving information technology specialists and users. Corrections for unforeseen eventualities will be needed, especially

  3. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  4. Forecasting the Success of Implementing Sensors Advanced Manufacturing Technology

    OpenAIRE

    Cheng-Shih Su; Shu-Chen Hsu

    2014-01-01

    This paper is presented fuzzy preference relations approach to forecast the success of implementing sensors advanced manufacturing technology (AMT). In the manufacturing environment, performance measurement is based on different quantitative and qualitative factors. This study proposes an analytic hierarchical prediction model based on fuzzy preference relations to help the organizations become aware of the essential factors affecting the AMT implementation, forecasting the chance of successf...

  5. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  6. AUTOMATED SYSTEM OF DATA PROCESSING WITH THE IMPLEMENTATION OF RATING TECHNOLOGY OF TEACHING

    Directory of Open Access Journals (Sweden)

    О. И. Дзювина

    2014-01-01

    Full Text Available Rating technology of teaching enables independent and individual work of students, increase their motivation.Purpose: to increase the efficiency of data processing with the implementation of rating technology of teaching.Method: analysis, synthesis,experiment.Results. Developed an automated data processing system for the implementation of rating technology of teaching.Practical implication. Education.Purchase on Elibrary.ru > Buy now

  7. Proposed plan for the development of advanced instrumentation and control technology in Korea

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Ham, Chang-Shik

    1995-01-01

    All of the nuclear power plants in Korea are operating with analog instrumentation and control (I and C) equipment which are increasingly faced with frequent troubles, obsolescence and high maintenance expense. Electrical and computer technology has improved rapidly in recent years and has been applied to other industries. So it is strongly recommended to adopt the modern digital and computer technology to improve plant safety and availability. The plan, which is aimed at replacement of existing I and C systems, and at improving planned as well as next generation digital I and C systems is divided into three major parts: (1) Plan for domestic design of I and C systems and components, (2) Plan for domestic manufacturing of I and C equipment, and (3) Plan for development of future technologies. This plan provides advanced digital I and C requirements equivalent to Electric Power Research Institute Utility Requirements Document (Chapter 10) Man Machine Interface Systems. Also this plan includes the critical issue of digital I and C, namely software verification and validation strategy. (6 refs., 1 fig., 2 tabs.)

  8. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Powell, H.T.; Kilkenny, J.D. [eds.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program.

  9. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    International Nuclear Information System (INIS)

    Powell, H.T.; Kilkenny, J.D.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program

  10. MANAGEMENT TECHNOLOGIES AS A MEANS OF IMPROVING MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Komarov V. F.

    2017-09-01

    Full Text Available Scientists and managers pay great attention to improving planning and accounting at the enterprise level. Significantly less attention is paid to issues of theory and methodology of the personal planning and accounting activities of the managers themselves. This reason causes companies to sustain large losses. These losses could be avoided by introducing the company management technology, within which formalized procedures of personal planning and accounting would be implemented. It is necessary to implement the technology specifically. Because only the technology allows you to synchronize and harmonize the individual steps, procedures, operations of a process. Allows you to control the process. Eliminates the concept of «management is an art» or «management is a craft». In favor of the concept of «management is regulated by the procedural process». That allows to avoid dependence on personal qualities and whims of the agents. The technology is based on the principle of decomposing every activity into its component elements. This separation, on the one hand, allows to raise efficiency of implementation of individual stages, procedures, operations. On the other hand, conscious design and implementation of a rational sequence of steps, procedures, and operations give the system effect - increase in the productivity of human activity. In addition, technologies serve as a mediator between science and practice (scientific knowledge is transmitted to the economic and social spheres through technology, and help replicate best practices, promote specialization of human activity (and hence growth of labor productivity. This article investigates the nature and properties of management technologies, the technique of their design, describes the experience of building technology for personal planning and accounting activities of managers and specialists at specific enterprises.

  11. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, Richard B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colwell, Jeffery A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  12. Current Strategic Business Plan for the Implementation of Digital Systems.

    Science.gov (United States)

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  13. Scenarios for the Strategic Planning of Technologies

    Directory of Open Access Journals (Sweden)

    Volker Grienitz

    2007-09-01

    Full Text Available Manufacturing based corporations often find themselves confronted with complexities of increased pressures to innovate in order to ensure their comparative market positions. In order to react to various exogenous changes corporations need to develop strategies that match their manufacturing resources as well as products with the markets requirements. Technology scenarios represent a holistic approach for managing innovation processes and technologies efficiently. A multidimensional requirement catalogue for specific product- market- combinations represents the fundamental building block for the ranking of particular material- components and technologies. The following analysis through evolutionary algorithms for compatibility between and amongst them provides the necessary information about their suitability. The resulting scenarios and roadmap and a regular monitoring process are prerequisite for the managerial decision making process and the implementation technology strategies.

  14. Technology Commercialization Program 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    This reference compilation describes the Technology Commercialization Program of the Department of Energy, Defense Programs. The compilation consists of two sections. Section 1, Plans and Procedures, describes the plans and procedures of the Defense Programs Technology Commercialization Program. The second section, Legislation and Policy, identifies legislation and policy related to the Program. The procedures for implementing statutory and regulatory requirements are evolving with time. This document will be periodically updated to reflect changes and new material.

  15. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    Science.gov (United States)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning

  16. Designing a total data solution technology, implementation, and deployment

    CERN Document Server

    Burkey, Roxanne

    2000-01-01

    Your company's global competitiveness depends on the utilization and maintenance of information. Current data handling practices-storing, updating, and accessing data-can be either a problem or a significant strategic advantage for your company. Designing a Total Data Storage Solution: Technology, Implementation, and Deployment gives you the information you need to compare current technologies and determine which is best suited to your enterprise.This book defines and explains the components that make up total cost of ownership along with the impact of integrating current changes in technology

  17. 40 CFR 52.142 - Federal Implementation Plan for Tri-Cities landfill, Salt River Pima-Maricopa Indian Community.

    Science.gov (United States)

    2010-07-01

    ...-Cities landfill, Salt River Pima-Maricopa Indian Community. 52.142 Section 52.142 Protection of... IMPLEMENTATION PLANS Arizona § 52.142 Federal Implementation Plan for Tri-Cities landfill, Salt River Pima... the Tri-Cities landfill located on the Salt River Pima-Maricopa Indian Community near Phoenix, Arizona...

  18. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  19. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  20. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  1. Technology decision making. A constructive approach to planning and acquisition will require a paradigm shift.

    Science.gov (United States)

    Berkowitz, D A; Swan, M M

    1993-01-01

    Technology should be viewed as an integrating rather than a divisive element in hospital planning. In the past, technology decision-making responsibility has often been diffused throughout hospitals, but providers are beginning to take a more considered and coherent approach. The process of making decisions about technology has four key elements: assessment, planning, acquisition, and management. The most important aspect of the assessment phase is the formation of a technology advisory committee to review and evaluate requests for new and emerging technology; review capital budget requests for new and replacement technology; and set mission-based and strategic priorities for new, emerging, and replacement technologies. Technology planning allows hospitals to set long-term goals for technology acquisition. The process involves an audit of existing technologies, evaluation of other hospitals' technologies, and review of technology trends. A well-defined technology plan will, in turn, facilitate the acquisition and management process, allowing hospitals greater flexibility in negotiating costs and budgeting for training, spare parts, service, upgrades, and support. By pooling resources with other providers in their region, hospitals can further enhance the effectiveness of their use and acquisition of technology. Collaboration allows providers to share the risks of technologically volatile and intensive services and avoid costly duplication of equipment and facilities.

  2. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  3. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  4. Digital Architecture Planning Model

    International Nuclear Information System (INIS)

    Oxstrand, Johanna Helene; Al Rashdan, Ahmad Yahya Mohammad; Bly, Aaron Douglas; Rice, Brandon Charles; Fitzgerald, Kirk; Wilson, Keith Leon

    2016-01-01

    As part of the U.S. Department of Energy's Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development

  5. Digital Architecture Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Oxstrand, Johanna Helene [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Al Rashdan, Ahmad Yahya Mohammad [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Bly, Aaron Douglas [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Rice, Brandon Charles [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Fitzgerald, Kirk [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Wilson, Keith Leon [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS)

    2016-03-01

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including

  6. Planning Multitechnology Access Networks with Performance Constraints

    Science.gov (United States)

    Chamberland, Steven

    Considering the number of access network technologies and the investment needed for the “last mile” of a solution, in today’s highly competitive markets, planning tools are crucial for the service providers to optimize the network costs and accelerate the planning process. In this paper, we propose to tackle the problem of planning access networks composed of four technologies/architectures: the digital subscriber line (xDSL) technologies deployed directly from the central office (CO), the fiber-to-the-node (FTTN), the fiber-to-the-micro-node (FTTn) and the fiber-to-the-premises (FTTP). A mathematical programming model is proposed for this planning problem that is solved using a commercial implementation of the branch-and-bound algorithm. Next, a detailed access network planning example is presented followed by a systematic set of experiments designed to assess the performance of the proposed approach.

  7. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  8. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  9. MEDBASE: Strategic Planning and Implementation of an Army Medical Department Software Application

    Science.gov (United States)

    2003-07-17

    downtime procedures) Software/ hardware performance testing Contingency plans Celebration / people management Risk Zone 4 Planning for upgrades...goal to “Crush Adidas !” and Honda’s goal in 1970 to “destroy Yamaha!”. MEDBASE: Strategy and Implementation 57 (3) Role Model BHAGs suit up-and...Crush Adidas ! (Nike, 1960s) Yamaha so tsubusu! We will destroy Yamaha! (Honda, 1970s) Role-Model BHAGs suit up-and-coming organizations Become the

  10. 76 FR 34886 - General Services Administration Acquisition Regulation; Implementation of Information Technology...

    Science.gov (United States)

    2011-06-15

    ... Acquisition Regulation; Implementation of Information Technology Security Provision AGENCY: Office of... information technology (IT) supplies, services and systems with security requirements. DATES: Effective Date... effective date that include information technology (IT) supplies, services and systems with security...

  11. 77 FR 749 - General Services Administration Acquisition Regulation; Implementation of Information Technology...

    Science.gov (United States)

    2012-01-06

    ... Acquisition Regulation; Implementation of Information Technology Security Provision AGENCY: Office of... orders that include information technology (IT) supplies, services and systems. DATES: Effective Date... 6, 2012 that include information technology (IT) supplies, services and systems with security...

  12. An Assessment of Advanced Manufacturing Technologies Implementation in Manufacturing Enterprises

    Directory of Open Access Journals (Sweden)

    Ghulam Yasin Shaikh

    2011-04-01

    Full Text Available The implementation of AMTs (Advanced Manufacturing Technologies has always been the high interest and core issue for the manufacturing enterprises to get rapid production for global market place. The developed countries have achieved its competitive advantage by implementing this unique model of technologies with full range of systems. In developing countries, the implementation of such technologies is not much common due to so many reasons, (political, social, economical and technical but entrepreneurs of growing economies are contemplating to reshape long term strategy to adopt Computer systems oriented technologies in their manufacturing companies to meet the growing needs of their indigenous market on one hand and to make a place in the international market on the other. Although, very few manufacturing organization do meet the global market requirements. But there is still lot of efforts to be taken for world class competition. An attempt has been made in this paper to develop a conceptual model taking in to account the three parameters such as, Direct, Indirect and Administrative AMTs. This research work further attempts to present an empirical data analysis conducted in the manufacturing enterprises in province of Sindh, Pakistan. The overall indigenous progress of manufacturing enterprises as according to the data collected from 60 companies reveals that the AMTs systems are partially understood and practiced that is also one of the cause towards slow progress of national exchequer.

  13. Preparing the 1993--94 Safeguards Implementation Support Programme for IAEA

    International Nuclear Information System (INIS)

    Green, L.

    1993-01-01

    The 1993-94 Safeguards Implementation Support (IS) Program describes the Department of Safeguards' program of implementation support for the coming two years. The main body of the document describes the IS program for IAEA. A detailed description of the individual IS needs for 1993-1994 is contained in an annex that specifies the nee, assigns priorities and lists tasks and activities underway to address the need. Other annexes address policy and procedures for program planning and management, current Member State Support Programs (MSSP) tasks, and identification of MSSP resources required for implementation of developed technologies that could be provided. The primary responsibility for supporting the implementation of safeguards technology is with the support divisions of the Department of Safeguards. However, in this time of limited resources it is essential that, where possible, the Department receives assistance from MSSPs that have the needed resources. This document should serve as a guide for IAEA, in planning implementation support activities and for identifying tasks for MSSPs wishing to provide assistance

  14. Implementing Trauma-Informed Partner Violence Assessment in Family Planning Clinics.

    Science.gov (United States)

    Decker, Michele R; Flessa, Sarah; Pillai, Ruchita V; Dick, Rebecca N; Quam, Jamie; Cheng, Diana; McDonald-Mosley, Raegan; Alexander, Kamila A; Holliday, Charvonne N; Miller, Elizabeth

    2017-09-01

    Intimate partner violence (IPV) and reproductive coercion (RC) are associated with poor reproductive health. Little is known about how family planning clinics implement brief IPV/RC assessment interventions in practice. We describe the uptake and impact of a brief, trauma-informed, universal IPV/RC assessment and education intervention. Intervention implementation was evaluated via a mixed methods study among women ages 18 and up receiving care at one of two family planning clinics in greater Baltimore, MD. This mixed methods study entailed a quasi-experimental, single group pretest-posttest study with family planning clinic patients (baseline and exit survey n = 132; 3-month retention n = 68; retention rate = 52%), coupled with qualitative interviews with providers and patients (total n = 35). Two thirds (65%) of women reported receiving at least one element of the intervention on their exit survey immediately following the clinic-visit. Patients reported that clinic-based IPV assessment is helpful, irrespective of IPV history. Relative to those who reported neither, participants who received either intervention element reported greater perceived caring from providers, confidence in provider response to abusive relationships, and knowledge of IPV-related resources at follow-up. Providers and patients alike described the educational card as a valuable tool. Participants described trade-offs of paper versus in-person, electronic medical record-facilitated screening, and patient reluctance to disclose current situations of abuse. In real-world family planning clinic settings, a brief assessment and support intervention was successful in communicating provider caring and increasing knowledge of violence-related resources, endpoints previously deemed valuable by IPV survivors. Results emphasize the merit of universal education in IPV/RC clinical interventions over seeking IPV disclosure.

  15. Intranet Implementation in a Context of Web Technology Discovery

    National Research Council Canada - National Science Library

    Asnawi, Amrullah

    1999-01-01

    This thesis presents a model of intranet implementation for a military facility within the context of an organization that is in the process of discovering Web technology and the browser as a central...

  16. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  17. Technology Roadmaps: A guide to development and implementation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    New low-carbon technologies show clear potential for transforming the global energy system, but a key challenge remains: what steps do governments and industry need to take to ensure their development and deployment? Roadmapping, used for decades in technology-intensive industries, is a useful tool to help address complicated issues strategically at the national, regional and global levels. To help turn political statements and analytical work into concrete action, the International Energy Agency (IEA) is developing a series of global roadmaps devoted to low-carbon energy technologies. This guide is aimed at providing countries and companies with the context, information and tools they need to design, manage and implement an effective energy roadmap process.

  18. Report of the AAPM Task Group No. 105: Issues associated with clinical implementation of Monte Carlo-based photon and electron external beam treatment planning

    International Nuclear Information System (INIS)

    Chetty, Indrin J.; Curran, Bruce; Cygler, Joanna E.; DeMarco, John J.; Ezzell, Gary; Faddegon, Bruce A.; Kawrakow, Iwan; Keall, Paul J.; Liu, Helen; Ma, C.-M. Charlie; Rogers, D. W. O.; Seuntjens, Jan; Sheikh-Bagheri, Daryoush; Siebers, Jeffrey V.

    2007-01-01

    The Monte Carlo (MC) method has been shown through many research studies to calculate accurate dose distributions for clinical radiotherapy, particularly in heterogeneous patient tissues where the effects of electron transport cannot be accurately handled with conventional, deterministic dose algorithms. Despite its proven accuracy and the potential for improved dose distributions to influence treatment outcomes, the long calculation times previously associated with MC simulation rendered this method impractical for routine clinical treatment planning. However, the development of faster codes optimized for radiotherapy calculations and improvements in computer processor technology have substantially reduced calculation times to, in some instances, within minutes on a single processor. These advances have motivated several major treatment planning system vendors to embark upon the path of MC techniques. Several commercial vendors have already released or are currently in the process of releasing MC algorithms for photon and/or electron beam treatment planning. Consequently, the accessibility and use of MC treatment planning algorithms may well become widespread in the radiotherapy community. With MC simulation, dose is computed stochastically using first principles; this method is therefore quite different from conventional dose algorithms. Issues such as statistical uncertainties, the use of variance reduction techniques, the ability to account for geometric details in the accelerator treatment head simulation, and other features, are all unique components of a MC treatment planning algorithm. Successful implementation by the clinical physicist of such a system will require an understanding of the basic principles of MC techniques. The purpose of this report, while providing education and review on the use of MC simulation in radiotherapy planning, is to set out, for both users and developers, the salient issues associated with clinical implementation and

  19. Implementation of workflow engine technology to deliver basic clinical decision support functionality.

    Science.gov (United States)

    Huser, Vojtech; Rasmussen, Luke V; Oberg, Ryan; Starren, Justin B

    2011-04-10

    Workflow engine technology represents a new class of software with the ability to graphically model step-based knowledge. We present application of this novel technology to the domain of clinical decision support. Successful implementation of decision support within an electronic health record (EHR) remains an unsolved research challenge. Previous research efforts were mostly based on healthcare-specific representation standards and execution engines and did not reach wide adoption. We focus on two challenges in decision support systems: the ability to test decision logic on retrospective data prior prospective deployment and the challenge of user-friendly representation of clinical logic. We present our implementation of a workflow engine technology that addresses the two above-described challenges in delivering clinical decision support. Our system is based on a cross-industry standard of XML (extensible markup language) process definition language (XPDL). The core components of the system are a workflow editor for modeling clinical scenarios and a workflow engine for execution of those scenarios. We demonstrate, with an open-source and publicly available workflow suite, that clinical decision support logic can be executed on retrospective data. The same flowchart-based representation can also function in a prospective mode where the system can be integrated with an EHR system and respond to real-time clinical events. We limit the scope of our implementation to decision support content generation (which can be EHR system vendor independent). We do not focus on supporting complex decision support content delivery mechanisms due to lack of standardization of EHR systems in this area. We present results of our evaluation of the flowchart-based graphical notation as well as architectural evaluation of our implementation using an established evaluation framework for clinical decision support architecture. We describe an implementation of a free workflow technology

  20. Implementation of workflow engine technology to deliver basic clinical decision support functionality

    Science.gov (United States)

    2011-01-01

    Background Workflow engine technology represents a new class of software with the ability to graphically model step-based knowledge. We present application of this novel technology to the domain of clinical decision support. Successful implementation of decision support within an electronic health record (EHR) remains an unsolved research challenge. Previous research efforts were mostly based on healthcare-specific representation standards and execution engines and did not reach wide adoption. We focus on two challenges in decision support systems: the ability to test decision logic on retrospective data prior prospective deployment and the challenge of user-friendly representation of clinical logic. Results We present our implementation of a workflow engine technology that addresses the two above-described challenges in delivering clinical decision support. Our system is based on a cross-industry standard of XML (extensible markup language) process definition language (XPDL). The core components of the system are a workflow editor for modeling clinical scenarios and a workflow engine for execution of those scenarios. We demonstrate, with an open-source and publicly available workflow suite, that clinical decision support logic can be executed on retrospective data. The same flowchart-based representation can also function in a prospective mode where the system can be integrated with an EHR system and respond to real-time clinical events. We limit the scope of our implementation to decision support content generation (which can be EHR system vendor independent). We do not focus on supporting complex decision support content delivery mechanisms due to lack of standardization of EHR systems in this area. We present results of our evaluation of the flowchart-based graphical notation as well as architectural evaluation of our implementation using an established evaluation framework for clinical decision support architecture. Conclusions We describe an implementation of

  1. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  2. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  3. Sable Offshore Energy Inc.: Response to 'The Canada-Nova Scotia Offshore Petroleum Board Benefits Plan Decision Report' Condition No. 3: Employment and Training Plan; Condition No. 4: Research and Development Plan; Condition No. 6: Disadvantaged Individual or Groups; Condition No. 7: Technology Transfer

    International Nuclear Information System (INIS)

    1998-01-01

    Decisions of the Canada-Nova Scotia Offshore Petroleum Board, regarding the responses of Sable Offshore Energy Inc (SOEI) to conditions imposed by the Board in the Sable Offshore Energy Project Canada-Nova Scotia Benefit Plan Decision Report, have been announced. According to the press release (copy attached), the Board accepted the responses of SOEI regarding the establishment and staffing of an office in Nova Scotia for the implementation and project management and training of project personnel, the level of expenditures for research and development to be undertaken in Nova Scotia, proposed initiatives for employment and training opportunities for disadvantaged individuals and groups, and a technology transfer plan that will facilitate succession planning and create joint venturing opportunities for Nova Scotian and Canadian industry. tabs., figs

  4. Strategy Planning of Technology Development for High Speed Railways : Electrical Parts

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Y. J.; Kim, K. H.; Rim, G. H.; Ha, H. D.; Park, K. Y.; Lee, J. D.; Kang, D. H. [Korea Electrotechnology Research Institute (Korea, Republic of)

    1996-11-01

    At the beginning of 1996, Government has set up the Technology Development Program for High Speed Railways as a national project. Accordingly, the detailed action planning has been established with the collaboration works between Ministry of Construction and Transport and Ministry of Commerce and Trade. On the other hand, the current technology status of domestic manufacturer and many related organizations in Korea only reveals the lack of capabilities in producing the high speed trains. Without the technology transfer programs from the advanced foreign manufacturer (GEC-Alsthom), the domestic manufacturers could not produce HSR. Korea Electrotechnology Research Institute has steered the study to integrate the domestic engineering and technology units specialized in the diversified areas by formulating the feasible collaboration structure between KERI and many organizations on the technology basis. The long term action planning both with the strategic guide and on the technology basis shall be the key function to upgrade the current technology status feasibly for development of the advanced high speed train of 350 km/h. (author). refs., figs., tabs.

  5. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC.

  6. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC

  7. Strategies to facilitate stakeholder and regulator support for technology deployment

    International Nuclear Information System (INIS)

    Burford, T.D.

    1997-01-01

    Implementation and deployment of new and innovative environmental technologies is impossible without regulator, enduser and stakeholder support. Technologies being developed for different needs require different strategies to facilitate this endorsement. Areas addressed will include technologies developed to meet site specific cleanup needs and those developed for multiple site applications. A third area deals with using site specific technologies at previously unidentified locations. In order to expand the application of these technologies to other sites a plan to include potential site regulators and stakeholders early in the development process should be considered. The Subsurface Contaminant Focus Area has developed a Stakeholder Communication Plan. This plan, in addition to lessons learned from current technology development projects that have successfully obtained this type of support, will provide the basis for the information provided in this paper. The object of this paper is to suggest strategies that could facilitate the implementation and deployment of technologies at environmental sites by involving regulators and stakeholders at the proper time for various applications

  8. Renewable energy technology portfolio planning with scenario analysis: A case study for Taiwan

    International Nuclear Information System (INIS)

    Chen, T.-Y.; Yu, Oliver S.; Hsu, George Jyh-yih; Hsu, Fang-Ming; Sung, W.-N.

    2009-01-01

    This paper presents the results of a case study of applying a systematic and proven process of technology portfolio planning with the use of scenario analysis to renewable energy developments in Taiwan. The planning process starts with decision values of technology development based on a survey of society leaders. It then generates, based on expert opinions and literature search, a set of major technology alternatives, which in this study include: wind energy, photovoltaic, bio-energy, solar thermal power, ocean energy, and geothermal energy. Through a committee of technical experts with diversified professional backgrounds, the process in this study next constructs three scenarios ('Season in the Sun', 'More Desire than Energy', and 'Castle in the Air') to encompass future uncertainties in the relationships between the technology alternatives and the decision values. Finally, through a second committee of professionals, the process assesses the importance and risks of these alternative technologies and develops a general strategic plan for the renewable energy technology portfolio that is responsive and robust for the future scenarios. The most important contributions of this paper are the clear description of the systematic process of technology portfolio planning and scenario analysis, the detailed demonstration of their application through a case study on the renewable energy development in Taiwan, and the valuable results and insights gained from the application.

  9. Implementation Never Ends! The Postimplementation Organizational and Operational Implications of ERP

    Science.gov (United States)

    Goldstein, Philip J.

    2006-01-01

    Planning for the ongoing support and maintenance that accompany implementation of new enterprise resource planning systems may be more essential to realizing benefit from a technology investment than choosing the product with the most features. (Contains 1 table.)

  10. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  11. RFID and Auto-ID in planning and logistics

    CERN Document Server

    Jones, Erick C

    2011-01-01

    As RFID technology is becoming increasingly popular, the need has arisen to address the challenges and approaches to successful implementation. RFID and Auto-ID in Planning and Logistics: A Practical Guide for Military UID Applications presents the concepts for students, military personnel and contractors, and corporate managers to learn about RFID and other automatic information capture technologies, and their integration into planning and logistics functions. The text includes comparisons of RFID with technologies such as bar codes, satellite tags, and global positioning systems and provides

  12. Development & Implementation of Electric Tram System with Wireless Charging Technology

    Directory of Open Access Journals (Sweden)

    DongHo Cho

    2015-06-01

    Full Text Available In this paper, an electric tram system with a wireless power transfer system based on SMFIR technology is presented. The detailed technology of power-line infra, regulator, and pick-up device is described for train application, respectively. Furthermore, implementation and experimental results for wireless power transfer electric tram are presented

  13. IMPLEMENTATION OF HEALTH TECHNOLOGY ASSESSMENT WORK IN A HOSPITAL IN KAZAKHSTAN.

    Science.gov (United States)

    Kosherbayeva, Lyazzat; Hailey, David; Kurakbaev, Kural; Tsoy, Aleksey; Zhuzzhanov, Ormanbek; Donbay, Abilay; Kumar, Ainur; Nadyrov, Kamalzhan

    2016-01-01

    The aim of this study was to implement health technology assessment (HA) in the First General City Hospital in Astana, Kazakhstan. We organized trainings to familiarize hospital staff with the purpose and details of HTA. An HTA committee was established, with representation from hospital physicians and managers, and criteria for prioritization of health technologies determined. Clinical departments of the hospital were asked to prepare applications for new technologies for their services. The HTA committee reviewed five applications and selected a technology from one of these, on single incision laparoscopic surgery (SILS), for assessment. A short HTA report on SILS was prepared, covering its safety, clinical effectiveness, and cost effectiveness. The report was used to support a request to the Department of Health for additional funding to implement this technology within the hospital. This funding was approved and SILS was established in several hospital departments. This successful initial experience with HTA has paved the way for its routine use by the hospital for informing decisions on the procurement and use of new health technologies.

  14. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  15. 77 FR 74820 - Approval and Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor...

    Science.gov (United States)

    2012-12-18

    ... Regional Office's normal hours of operation. The Regional Office's official hours of business are Monday... maintenance plan to increase the safety margin as a result of new emissions model, VMT projection models, and... Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor Vehicle Emissions Budget Update...

  16. Barriers and facilitators to implementing cancer survivorship care plans.

    Science.gov (United States)

    Dulko, Dorothy; Pace, Claire M; Dittus, Kim L; Sprague, Brian L; Pollack, Lori A; Hawkins, Nikki A; Geller, Berta M

    2013-11-01

    To evaluate the process of survivorship care plan (SCP) completion and to survey oncology staff and primary care physicians (PCPs) regarding challenges of implementing SCPs. Descriptive pilot study. Two facilities in Vermont, an urban academic medical center and a rural community academic cancer center. 17 oncology clinical staff created SCPs, 39 PCPs completed surveys, and 58 patients (breast or colorectal cancer) participated in a telephone survey. Using Journey Forward tools, SCPs were created and presented to patients. PCPs received the SCP with a survey assessing its usefulness and barriers to delivery. Oncology staff were interviewed to assess perceived challenges and benefits of SCPs. Qualitative and quantitative data were used to identify challenges to the development and implementation process as well as patient perceptions of the SCP visit. SCP, healthcare provider perception of barriers to completion and implementation, and patient perception of SCP visit. Oncology staff cited the time required to obtain information for SCPs as a challenge. Completing SCPs 3-6 months after treatment ended was optimal. All participants felt advanced practice professionals should complete and review SCPs with patients. The most common challenge for PCPs to implement SCP recommendations was insufficient knowledge of cancer survivor issues. Most patients found the care plan visit very useful, particularly within six months of diagnosis. Creation time may be a barrier to widespread SCP implementation. Cancer survivors find SCPs useful, but PCPs feel insufficient knowledge of cancer survivor issues is a barrier to providing best follow-up care. Incorporating SCPs in electronic medical records may facilitate patient identification, appropriate staff scheduling, and timely SCP creation. Oncology nurse practitioners are well positioned to create and deliver SCPs, transitioning patients from oncology care to a PCP in a shared-care model of optimal wellness. Institution support for

  17. National Aeronautics and Space Administration plans for space communication technology

    Science.gov (United States)

    Alexovich, R. E.

    1979-01-01

    A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

  18. Prospects and Challenges of Implementing the Hydrographic Region VIII Basin Plan

    Directory of Open Access Journals (Sweden)

    Nathalia Silva Duarte

    2011-12-01

    Full Text Available The current “National Water Law” states that water resources plans must be elaborated by basins, states, and for the country. This essay discusses the water management process considering federal and state legislations and their interrelations, for the purpose of elucidating the gaps found in them , aiming at their applicability to the system of water resources management within the CBH- Macaé and Ostras scope. It also discusses the construction and evolution process of the above-mentioned committee, and developments in the implementation of the Basin Plan of Hydrographic Region VIII.

  19. Land-use planning of Volyn region (Ukraine) using Geographic Information Systems (GIS) technologies

    Science.gov (United States)

    Strielko, Irina; Pereira, Paulo

    2014-05-01

    Land-use development planning is carried out in order to create a favourable environment for human life, sustainable socioeconomic and spatial development. Landscape planning is an important part of land-use development that aims to meet the fundamental principles of sustainable development. Geographic Information Systems (GIS) is a fundamental tool to make a better landscape planning at different territorial levels, providing data and maps to support decision making. The objective of this work is to create spatio-temporal, territorial and ecological model of development of Volyn region (Ukraine). It is based on existing spatial raster and vector data and includes the analysis of territory dynamics as the aspects responsible for it. A spatial analyst tool was used to zone the areas according to their environmental components and economic activity. This analysis is fundamental to define the basic parameters of sustainability of Volyn region. To carry out this analysis, we determined the demographic capacity of districts and the analysis of spatial parameters of land use. On the basis of the existing natural resources, we observed that there is a need of landscape protection and integration of more are natural areas in the Pan-European Ecological Network. Using GIS technologies to landscape planning in Volyn region, allowed us to identify, natural areas of interest, contribute to a better resource management and conflict resolution. Geographic Information Systems will help to formulate and implement landscape policies, reform the existing administrative system of Volyn region and contribute to a better sustainable development.

  20. Reciprocal Peer Coaching: A Critical Contributor to Implementing Individual Leadership Plans

    Science.gov (United States)

    Goldman, Ellen; Wesner, Marilyn; Karnchanomai, Ornpawee

    2013-01-01

    Billions of dollars are spent annually on programs to develop organizational leaders, yet the effectiveness of these programs is poorly understood. Scholars advise that value is enhanced by the development of individual leadership plans at program completion, followed by implementation experience with subsequent coaching and reflection. The…