WorldWideScience

Sample records for technical work plan

  1. Reduced waste generation technical work plan

    International Nuclear Information System (INIS)

    1987-05-01

    The United States Department of Energy has established policies for avoiding plutonium losses to the waste streams and minimizing the generation of wastes produced at its nuclear facilities. This policy is evidenced in DOE Order 5820.2, which states ''Technical and administrative controls shall be directed towards reducing the gross volume of TRU waste generated and the amount of radioactivity in such waste.'' To comply with the DOE directive, the Defense Transuranic Waste Program (DTWP) supports and provides funding for specific research and development tasks at the various DOE sites to reduce the generation of waste. This document has been prepared to give an overview of current and past Reduced Waste Generation task activities which are to be based on technical and cost/benefit factors. The document is updated annually, or as needed, to reflect the status of program direction. Reduced Waste Generation (RWG) tasks encompass a wide range of goals which are basically oriented toward (1) avoiding the generation of waste, (2) changing processes or operations to reduce waste, (3) converting TRU waste into LLW by sorting or decontamination, and (4) reducing volumes through operations such as incineration or compaction

  2. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  3. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  4. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  5. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  6. Technical Work Plan for: Thermodynamic Databases for Chemical Modeling

    International Nuclear Information System (INIS)

    C.F. Jovecolon

    2006-01-01

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species

  7. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    International Nuclear Information System (INIS)

    C.T. Bastian

    2003-01-01

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES and H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters

  8. Technical Work Plan for: Additional Multiscale Thermohydrologic Modeling

    International Nuclear Information System (INIS)

    B. Kirstein

    2006-01-01

    will be evaluated and justified. Some of this evaluation will be conducted in conjunction with the post-model development validation activity involving comparisons of predicted TH conditions with measured TH conditions in the DST. The expected result is that, consistent with what was found in Revision 03 of Multiscale Thermohydrologic Model (BSC 2005 [DIRS 173944], Section 6.3.9), near-field/in-drift TH behavior is insensitive to a wide range of host-rock hydrologic property values. It is the intention of the work described in this TWP to propagate the new infiltration fluxes from the replacement infiltration model, by using the percolation fluxes from the revised site-scale unsaturated zone (UZ) flow model that has applied those new infiltration fluxes. The percolation flux distributions will be obtained from the updated site-scale UZ flow model, which has applied updated infiltration flux maps. Another objective of the work scope is to develop, implement, and validate a revised TH submodel-construction approach. This revised approach utilizes interpolation among a set of generic LDTH submodels that are run for a range of percolation flux histories that cover a sufficiently broad range of infiltration flux uncertainty, as well as for four host-rock units (two lithophysal units and two nonlithophysal units), and for three thermal property sets (low, mean, and high). A key motivation for this revised LDTH submodel-construction approach is to enable the MSTHM to be more flexible in addressing a broad range of infiltration flux cases. This approach allows the generic LDTH submodel simulations to be conducted prior to receiving percolation flux maps

  9. Some considerations on the development of individual work plan for teachers of Technical and Vocational Education

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Gato Armas

    2010-03-01

    Full Text Available This article analyzes, from the optics of upgrading Technical and Professional Education chief staff in the province and professors in the Technical Sciences Faculty in the University of Pedagogical Sciencies “Rafael María of Mendive” in Pinar del Río, which can facilitate the elaboration of the plan for teachers’ individual work, so that it facilitates the assessment and performance of the planned activities, and at the same time, propitiating the professional development of the teachers, in each school term.

  10. Technical Work Plan for: Near Field Environment: Engineered Barrier System: Radionuclide Transport Abstraction Model Report

    International Nuclear Information System (INIS)

    J.D. Schreiber

    2006-01-01

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model will be revised to be consistent with

  11. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  12. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  13. INDOT Technical Training Plan

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  14. Technical Work Plan for: Near Field Environment: Engineered System: Radionuclide Transport Abstraction Model Report

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Schreiber

    2006-12-08

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model

  15. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  16. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  17. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  18. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  19. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  20. INDOT Technical Training Plan : [Technical Summary

    Science.gov (United States)

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  1. Technical aspects of the integration of three-dimensional treatment planning dose parameters (GEC-ESTRO Working Group) into pre-implant planning for LDR gynecological interstitial brachytherapy.

    Science.gov (United States)

    Chi, A; Gao, M; Nguyen, N P; Albuquerque, K

    2009-06-01

    This study investigates the technical feasibility of pre-implant image-based treatment planning for LDR GYN interstitial brachytherapy(IB) based on the GEC-ESTRO guidelines. Initially, a virtual plan is generated based on the prescription dose and GEC-ESTRO defined OAR dose constraints with a pre-implant CT. After the actual implant, a regular diagnostic CT was obtained and fused with our pre-implant scan/initial treatment plan in our planning software. The Flexi-needle position changes, and treatment plan modifications were made if needed. Dose values were normalized to equivalent doses in 2 Gy fractions (LQED 2 Gy) derived from the linear-quadratic model with alpha/beta of 3 for late responding tissues and alpha/beta of 10 for early responding tissues. D(90) to the CTV, which was gross tumor (GTV) at the time of brachytherapy with a margin to count for microscopic disease, was 84.7 +/- 4.9% of the prescribed dose. The OAR doses were evaluated by D(2cc) (EBRT+IB). Mean D(2cc) values (LQED(2Gy)) for the rectum, bladder, sigmoid, and small bowel were the following: 63.7 +/- 8.4 Gy, 61.2 +/- 6.9 Gy, 48.0 +/- 3.5 Gy, and 49.9 +/- 4.2 Gy. This study confirms the feasibility of applying the GEC-ESTRO recommended dose parameters in pre-implant CT-based treatment planning in GYN IB. In the process, this pre-implant technique also demonstrates a good approximation of the target volume dose coverage, and doses to the OARs.

  2. NWMO transportation technical work program

    International Nuclear Information System (INIS)

    Hatton, C.

    2015-01-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  3. NWMO transportation technical work program

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, C. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  4. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  5. Succession planning for technical experts

    International Nuclear Information System (INIS)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.; Agreda, Carla L.

    2017-01-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  6. Succession planning for technical experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dewji, Shaheen A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-07-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  7. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  8. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  9. Technical Work Plan For: Calculation of Waste Package and Drip Shield Response to Vibratory Ground Motion and Revision of the Seismic Consequence Abstraction

    International Nuclear Information System (INIS)

    M. Gross

    2006-01-01

    The overall objective of the work scope covered by this technical work plan (TWP) is to develop new damage abstractions for the seismic scenario class in total system performance assessment (TSPA). The new abstractions will be based on a new set of waste package and drip shield damage calculations in response to vibratory ground motion and fault displacement. The new damage calculations, which are collectively referred to as damage models in this TWP, are required to represent recent changes in waste form packaging and in the regulatory time frame. The new damage models also respond to comments from the Independent Validation Review Team (IVRT) postvalidation review of the draft TSPA model regarding performance of the drip shield and to an Additional Information Need (AIN) from the U.S. Nuclear Regulatory Commission (NRC)

  10. Technical Work Plan For: Calculation of Waste Packave and Drip Shield Response to Vibratory Ground Motion and Revision of the Seismic Consequence Abstraction

    Energy Technology Data Exchange (ETDEWEB)

    M. Gross

    2006-12-08

    The overall objective of the work scope covered by this technical work plan (TWP) is to develop new damage abstractions for the seismic scenario class in total system performance assessment (TSPA). The new abstractions will be based on a new set of waste package and drip shield damage calculations in response to vibratory ground motion and fault displacement. The new damage calculations, which are collectively referred to as damage models in this TWP, are required to represent recent changes in waste form packaging and in the regulatory time frame. The new damage models also respond to comments from the Independent Validation Review Team (IVRT) postvalidation review of the draft TSPA model regarding performance of the drip shield and to an Additional Information Need (AIN) from the U.S. Nuclear Regulatory Commission (NRC).

  11. Technical basis for PWR emergency plans forming

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-10-01

    Our speech first summarizes the french approach concerning the management of severe accidents which could occur on PWR stations. Then it defines the source-term which is being used as a general support for elaborating the emergency plans devoted to the protection of the population. It describes next the consequences of this source-term on the site and in the environment, which constitute the technical bases for defining actions of utilities and concerned authorities. It gives lastly information on the present status of the different emergency plans and the complementary work undertaken to improve them [fr

  12. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  13. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  14. [Ageing and work: technical standards].

    Science.gov (United States)

    De Vito, G; Riva, M A; Meroni, R; Cesana, G C

    2010-01-01

    Over the last few years, studies on the relationship between ageing and work have attracted growing interest due to the increased probability among workers of developing major health problems as a consequence of ageing of the working population. Negative outcomes for health are possible when an age-related imbalance appears between physical workload and physical work capacity. Interventions based on workload reductions should help to keep workers on the job for as long as allowed by law. Reference masses by age and sex are suggested by the technical standards of the ISO 11228 series, which are also quoted by Italian law D.Lgs. 81/2008, and EN 1005 series, which recommend limits valid also for manual material handling, and pushing and pulling. Decreasing low back pain prevalence or recurrence, in an ageing population with high prevalence of back disorders, could be more effective than many other approaches to enhance workers' quality of life and consequently maintain and improve workers' performance.

  15. INDOT Technical Training Plan : Appendix H

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix L

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix D

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix A

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix G

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix P

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix I

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. INDOT Technical Training Plan : Appendix M

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  3. INDOT Technical Training Plan : Appendix F

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  4. INDOT Technical Training Plan : Appendix E

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  5. INDOT Technical Training Plan : Appendix O

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  6. INDOT Technical Training Plan : Appendix J

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. INDOT Technical Training Plan : Appendix K

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  8. INDOT Technical Training Plan : Appendix B

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. INDOT Technical Training Plan : Appendix N

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  10. INDOT Technical Training Plan : Appendix C

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  11. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  12. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  13. Works Technical Department progress report, March 1961

    Energy Technology Data Exchange (ETDEWEB)

    None

    1961-04-19

    This document details the activities of the Savannah River Works Technical Department during the month of March 1961. Topics discussed are: Reactor Technology, Separations Technology, Engineering Assistance, Health Physics, Laboratories Overview, and Technical Papers Issued.

  14. Clean Energy Works Oregon Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Jacob, Andria [City of Portland; Cyr, Shirley [Clean Energy Works

    2013-12-31

    In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

  15. ACT Plan: Technical Manual. 2013/2014

    Science.gov (United States)

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  16. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  17. Planning of Maintenance and Repair of Complicated Technical Systems

    Directory of Open Access Journals (Sweden)

    N. I. Liseychikov

    2004-01-01

    Full Text Available It is expedient to use mathematical models for substantiation of operational material consumption at maintenance of complicated technical systems. The appropriate tasks have been considered: minimization of operational material consumption; determination of maximum scope of work to be executed while maintaining one system; optimization of operational material consumption while organizing maintenance of a system group; planning of technical maintenance and determination of a number of systems to be maintained. Formalization and solution of the above problems have been accomplished.

  18. ALWR utility requirements - A technical basis for updated emergency planning

    International Nuclear Information System (INIS)

    Leaver, David E.W.; DeVine, John C. Jr.; Santucci, Joseph

    2004-01-01

    U.S. utilities, with substantial support from international utilities, are developing a comprehensive set of design requirements in the form of a Utility Requirements Document (URD) as part of an industry wide effort to establish a technical foundation for the next generation of light water reactors. A key aspect of the URD is a set of severe accident-related design requirements which have been developed to provide a technical basis for updated emergency planning for the ALWR. The technical basis includes design criteria for containment performance and offsite dose during severe accident conditions. An ALWR emergency planning concept is being developed which reflects this severe accident capability. The main conclusion from this work is that the likelihood and consequences of a severe accident for an ALWR are fundamentally different from that assumed in the technical basis for existing emergency planning requirements, at least in the U.S. The current technical understanding of severe accident risk is greatly improved compared to that available when the existing U.S. emergency planning requirements were established nearly 15 years ago, and the emerging ALWR designs have superior core damage prevention and severe accident mitigation capability. Thus, it is reasonable and prudent to reflect this design capability in the emergency planning requirements for the ALWR. (author)

  19. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  20. Work hazard prevention plans

    International Nuclear Information System (INIS)

    Albertos Campos, F.

    2009-01-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  1. Discussion on enterprise technical standard management work

    International Nuclear Information System (INIS)

    Li Xinyou

    2010-01-01

    The technical standard management is an important part of enterprise information work, also the basis of enterprise standardization work. Only by rational and orderly management, can it exert maximum effectiveness, provide reliable support for the production and business of enterprise. (author)

  2. Performance improvement plan in customer technical services

    International Nuclear Information System (INIS)

    Lachambre, L.

    1995-01-01

    This presentation centred around the philosophy, goals, and initiatives associated with Gaz Metropolitain's performance improvement plan. Various aspects of the plan including customer surveys, new customer service policies, the creation of small working units, the decentralization of the Montreal service department, and customer-harmonized shift schedules were explored. Implementation of new service plans and contracts, the formation of improvement groups related to human resources, human resource and productivity management, leadership training, and the use of performance indicators were also explained

  3. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  4. INMM Physical Protection Technical Working Group Workshops

    International Nuclear Information System (INIS)

    Williams, J.D.

    1982-01-01

    The Institute of Nuclear Materials Management (INMM) established the Physical Protection Technical Working Group to be a focal point for INMM activities related to the physical protection of nuclear materials and facilities. The Technical Working Group has sponsored workshops with major emphasis on intrusion detection systems, entry control systems, and security personnel training. The format for these workshops has consisted of a series of small informal group discussions on specific subject matter which allows direct participation by the attendees and the exchange of ideas, experiences, and insights. This paper will introduce the reader to the activities of the Physical Protection Technical Working Group, to identify the workshops which have been held, and to serve as an introduction to the following three papers of this session

  5. The technical bases for government emergency plans

    International Nuclear Information System (INIS)

    Champion, D.; Herviou, K.

    2006-01-01

    Despite technical and organisational existing arrangements to prevent human and equipment failures, the occurrence of a severe accident inducing an important release of radioactive or toxic products could not be totally excluded. Public authorities are responsible for the development of emergency plans which main objective is the protection of the population in case of accident. The efficiency of emergency plans assumes they have been established before the occurrence of any accident, taking into account specificities of the installation and its environment. On the basis of the list of possible events likely to induce releases into the environment, some 'envelope' scenarios are selected and their consequences are assessed- The comparison of the consequences to reference levels for which protective actions are recommended gives the area where actions may be required. This approach is applied for the different nuclear facilities in France. Examples are given in the article on the definition of emergency plans technical basis for nuclear power plants, other nuclear facilities and transportation of radioactive materials. (authors)

  6. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  7. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  8. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  9. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  10. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  11. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  12. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  13. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  14. Optimal maintenance work organization and technical education

    International Nuclear Information System (INIS)

    Toshiro Kitamura

    2005-01-01

    Under Japanese multi-layered maintenance routines, almost 100% of work is delegated to outside contractors. For taking such form, there are several reasons unique to Japan. U.S. maintenance work organization makes a contrast, reducing the volume of subcontract in these past ten years. On the other hand, France has a trend of increasing the volume of subcontract for cost reduction that is expected in liberalization and privatization. In Japan, since the subcontract went too far, there is a trend that the multi-layered subcontract structure will be relieved. The Japan Atomic Power, Inc., has organized a team that performs a part of maintenance work by employees themselves since three years before. Direct work is effective to greatly supporting the employees' technical ability. It is expected that the quality of subcontract management will be markedly improved from now on. (author)

  15. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  16. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  17. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  18. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  19. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  20. Crowdsourcing for Challenging Technical Problems - It Works!

    Science.gov (United States)

    Davis, Jeffrey R.

    2011-01-01

    problems or challenges were posted through three different vendors: InnoCentive, yet2.com and TopCoder. The 20 internal challenges were conducted using the InnoCentive crowdsourcing platform designed for use internal to an organization and customized for NASA use, and promoted as NASA@Work. The results were significant. Of the seven InnoCentive external challenges, two full and five partial awards were made in complex technical areas such as predicting solar flares and long-duration food packaging.

  1. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  2. Supplement to a Methodology for Succession Planning for Technical Experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-11-01

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  3. Louisiana ITS business plan : technical summary.

    Science.gov (United States)

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  4. Technical Targets - A Tool to Support Strategic Planning in the Subsurface Contaminants Focus Area

    International Nuclear Information System (INIS)

    Looney, B.B.

    2002-01-01

    The Subsurface Contaminants Focus Area (SCFA) is supported by a lead laboratory consisting of technical representatives from DOE laboratories across the country. This broadly representative scientific group has developed and implemented a process to define Technical Targets to assist the SCFA in strategic planning and in managing their environmental research and development portfolio. At an initial meeting in Golden Colorado, an initial set of Technical Targets was identified using a rapid consensus based technical triage process. Thirteen Technical Targets were identified and described. Vital scientific and technical objectives were generated for each target. The targets generally fall into one of the following five strategic investment categories: Enhancing Environmental Stewardship, Eliminating Contaminant Sources, Isolating Contaminants, Controlling Contaminant Plumes, Enabling DOEs CleanUp Efforts. The resulting targets and the detail they comprise on what is, and what is not, needed to meet Environmental Management needs provide a comprehensive technically-based framework to assist in prioritizing future work and in managing the SCFA program

  5. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  6. Behavior Plan, Does It Work?

    Science.gov (United States)

    Gonzalez, Blanca M.; Brown, D.

    2015-01-01

    As educators, we are responsible for teaching academic skills. However, some students not only need to learn academic skills but they need behavior support, due to problematic behaviors that are happening in the school setting. In this article, we will learn more of what are the implications, requirements and best strategies for a behavior plan.…

  7. Drawing plan for solid works

    International Nuclear Information System (INIS)

    Lee, Kuk Hwan; Kim, Hyung Seop; Yu, Dae Won

    2004-02-01

    This book deals with beginning solid works 2003, setting system option, setting tool group, setting document and storing part template file. It also introduces works of basic solid works modeling such as making of square, circuit, plate washer, square column, block I, block II, link, cover plate, position block and housing. The last part explains drawing of fix block, stopper plate III, bracket, cover, belt pulley, circle plate, square, block, stopper block, angle block, washer, circle block and link.878

  8. Technical plan for nondestructive examination technology development

    International Nuclear Information System (INIS)

    Anderson, B.C.

    1982-12-01

    This report provides a description of the development of the nondestructive examination (NDE) equipment to be used in the Stored Waste Examination Pilot Plant (SWEPP) for certifying transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). NDE equipment is being developed for waste identification and container integrity. Real-time x-ray radiography is the basic method being used for waste identification. Acoustic (ultrasonic) testing is being used to obtain measurements to verify container integrity. This report describes the decisions made to date, the decisions to be made, and the activities planned for FY 1983 through FY 1985

  9. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  10. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  11. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  12. PETRA - Technical implementation. PETRA working no. 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This report describes the technical implementation of PETRA. The report is intended for specialist users and refers to the series of reports describing the project. The PETRA system consists of a number of econometric models, representing the national travel demand in Denmark. Application of these models requires the definition of a scenario, a number of runs with the individual models and extensive data transfer between the models and a database containing base data and results. The system contains three basic scenarios to which changes in various assumptions can be applied. It is possible to construct more basic scenarios but this is outside the scope of using the model as it presently stands. The focus of this report is thus on the specification of changes to basic scenario, on running the model - including description of the data flows, and on the possibilities for analysis of the results. (au) EFP-94. 11 refs.

  13. Technical Training: CLEAN-2002: Working in a Cleanroom

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch CERN Technical Training Programme: Learning for the LHC! CLEAN-2002 is a free of charge, half-day seminar in the context of Technical Training for the LHC. The course is designed for personnel working or managing activities in an assembly cleanroom, for example physicists, engineers and technicians working at or visiting the laboratory. CLEAN-2002 is aimed at raising awareness about good working practices in a cleanroom, and at providing practical examples, analysis tools, and documentation. Specific ...

  14. Report on all ARRA Funded Technical Work

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

  15. International Technical Working Group Round Robin Tests

    Energy Technology Data Exchange (ETDEWEB)

    Dudder, Gordon B.; Hanlen, Richard C.; Herbillion, Georges M.

    2003-02-01

    The goal of nuclear forensics is to develop a preferred approach to support illicit trafficking investigations. This approach must be widely understood and accepted as credible. The principal objectives of the Round Robin Tests are to prioritize forensic techniques and methods, evaluate attribution capabilities, and examine the utility of database. The HEU (Highly Enriched Uranium) Round Robin, and previous Plutonium Round Robin, have made tremendous contributions to fulfilling these goals through a collaborative learning experience that resulted from the outstanding efforts of the nine participating internal laboratories. A prioritized list of techniques and methods has been developed based on this exercise. Current work is focused on the extent to which the techniques and methods can be generalized. The HEU Round Robin demonstrated a rather high level of capability to determine the important characteristics of the materials and processes using analytical methods. When this capability is combined with the appropriate knowledge/database, it results in a significant capability to attribute the source of the materials to a specific process or facility. A number of shortfalls were also identified in the current capabilities including procedures for non-nuclear forensics and the lack of a comprehensive network of data/knowledge bases. The results of the Round Robin will be used to develop guidelines or a ''recommended protocol'' to be made available to the interested authorities and countries to use in real cases.

  16. International Technical Working Group Round Robin Tests

    International Nuclear Information System (INIS)

    Dudder, Gordon B.; Hanlen, Richard C.; Herbillion, Georges M.

    2003-01-01

    The goal of nuclear forensics is to develop a preferred approach to support illicit trafficking investigations. This approach must be widely understood and accepted as credible. The principal objectives of the Round Robin Tests are to prioritize forensic techniques and methods, evaluate attribution capabilities, and examine the utility of database. The HEU (Highly Enriched Uranium) Round Robin, and previous Plutonium Round Robin, have made tremendous contributions to fulfilling these goals through a collaborative learning experience that resulted from the outstanding efforts of the nine participating internal laboratories. A prioritized list of techniques and methods has been developed based on this exercise. Current work is focused on the extent to which the techniques and methods can be generalized. The HEU Round Robin demonstrated a rather high level of capability to determine the important characteristics of the materials and processes using analytical methods. When this capability is combined with the appropriate knowledge/database, it results in a significant capability to attribute the source of the materials to a specific process or facility. A number of shortfalls were also identified in the current capabilities including procedures for non-nuclear forensics and the lack of a comprehensive network of data/knowledge bases. The results of the Round Robin will be used to develop guidelines or a ''recommended protocol'' to be made available to the interested authorities and countries to use in real cases

  17. [Some psychological problems in family planning work].

    Science.gov (United States)

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  18. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan

  19. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  20. Dealer Group or Financial Planning Group? A Brief Technical Note

    Directory of Open Access Journals (Sweden)

    Lujer Santacruz

    2011-06-01

    Full Text Available This technical note examines whether the industry practice of using the term dealer group when referring to afinancial planning group contributes to the general perception that financial advisers are not objective whenmaking financial product recommendations. An experimental design carried out through an online survey isused. This is supplemented by a direct comparison survey on the two terminologies. The results provide acase for the industry to adopt a new terminology.

  1. Planned Parenthood works with Korean government.

    Science.gov (United States)

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  2. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  3. Technical basis for the preparation of emergency plans relating to pressurized water reactors

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-01-01

    The paper begins by summarizing the standard French approach to management of severe accidents at PWR plants. It goes on to define the source term used as a general basis for emergency plans for protection of the civil population. The paper describes the impact this source term has on both the site and the environment, which is subsequently used as a technical basis for determining the response of the utility and the public authorities concerned. The discussion concludes with a brief outline of the current status of various emergency plans and a description of additional work currently in progress and aimed at improving these plans [fr

  4. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  5. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  6. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...

  7. Technical task plan for Acquire Commercial Technology for Retrieval

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-01-01

    Objective is to determine from industry their best approaches to retrieving waste from the Single Shell Tanks. This task plan describes the first 18 months of work; the task will be further defined as the work progresses. The retrieval is to be demonstrated on tank 241-C-106

  8. Planning for Workforce Reductions: A Technical Assistance Guide for Employers.

    Science.gov (United States)

    Balfe, Kevin

    This guide is designed to help employers plan work force reductions. It emphasizes positive collaboration with workers and the community to find new jobs for workers and maintain morale and productivity in the plant. The guide is divided into five chapters. The first chapter acquaints the reader with some of the benefits of work force reduction…

  9. Sustainable Mining Environment: Technical Review of Post-mining Plans

    Directory of Open Access Journals (Sweden)

    Restu Juniah

    2017-12-01

    Full Text Available The mining industry exists because humans need mining commodities to meet their daily needs such as motor vehicles, mobile phones, electronic equipment and others. Mining commodities as mentioned in Government Regulation No. 23 of 2010 on Implementation of Mineral and Coal Mining Business Activities are radioactive minerals, metal minerals, nonmetallic minerals, rocks and coal. Mineral and coal mining is conducted to obtain the mining commodities through production operations. Mining and coal mining companies have an obligation to ensure that the mining environment in particular after the post production operation or post mining continues. The survey research aims to examine technically the post-mining plan in coal mining of PT Samantaka Batubara in Indragiri Hulu Regency of Riau Province towards the sustainability of the mining environment. The results indicate that the post-mining plan of PT Samantaka Batubara has met the technical aspects required in post mining planning for a sustainable mining environment. Postponement of post-mining land of PT Samantaka Batubara for garden and forest zone. The results of this study are expected to be useful and can be used by stakeholders, academics, researchers, practitioners and associations of mining, and the environment.

  10. TECHNICAL DOCUMENT PREPARATION PLAN FOR THE RETRIEVABILITY STRATEGY REPORT

    International Nuclear Information System (INIS)

    P.D. Gehner

    1997-01-01

    The objective of this systems study is to produce a waste removability strategy document that contains sufficient details, recommended design alternatives, and the technical rationale (a) to support Licensing in the development of the License Application Plan, and (b) to provide input in the form of design requirements, for the FY 97 Retrieval Design & Operation activity in support of viability assessment. The intent of this systems study is to support a decision on how to proceed with design with respect to retrievability, regarding the extent to which the repository/waste package designs should accommodate the retrieval option

  11. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  12. Socio-technicality, Human Work Interaction Design (HWID), and Work Engagement

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Campos, Pedro; Abdelnour-Nocera, José

    the sociotechnical tradition, however, tells us that looking at work engagement only or mainly from a technical design side is the wrong way to go; instead the social and the technical need to be considered on an equal footing. We give the theoretical motivation and background in sociotechnical thinking for our...

  13. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  14. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    Science.gov (United States)

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  15. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  16. Enhancing Effective Stakeholder Participation in Local Groundwater Sustainability Planning through Technical Assistance in California

    Science.gov (United States)

    Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.

    2017-12-01

    This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support

  17. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  18. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    Croft, J.R.; Robb, J.D.

    1993-01-01

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  19. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  20. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  1. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  2. Technical progress in planning organization of the Ostravo-Karwina coal basin, ''Mining Projects of Ostravo''

    Energy Technology Data Exchange (ETDEWEB)

    Karpeta, B; Kolar, J

    1979-01-01

    Based on the main task of further improvement in labor productivity and improvement in the quality of products, the leading planning organization of the Ostravo-Karwina basin is planning and realizing progressive technological plans based on new equipment. Long-term plans for basin development up to 1990 stipulate a rise in capital investments by 180%, increase in the volume of productivity by 164% with a rise in the number of workers by 142%. Corresponding technical progress in planning is based on an improvement in the system of scientific-technical information, automation and technical equipping of the planning process, improvements in the forms and organizational structure. Organization of specialized research-planning groups to substantiate and to technically-economically evaluate technical progress, and also to develop comprehensive technical assignments is stipulated.

  3. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  4. International Technical Working Group Cooperation to Counter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D K; Niemeyer, S

    2004-01-01

    The Nuclear Smuggling International Technical Working Group (ITWG) is an international body of nuclear forensic experts that cooperate to deter the illicit trafficking of nuclear materials. The objective of the ITWG is to provide a common approach and effective technical solutions to governments who request assistance in nuclear forensics. The ITWG was chartered in 1996 and since that time more than 28 nations and organizations have participated in 9 international meetings and 2 analytical round-robin trials. Soon after its founding the ITWG adopted a general framework to guide nuclear forensics investigations that includes recommendations for nuclear crime scene security and analysis, the best application of radioanalytical methods, the conduct of traditional forensic analysis of contaminated materials, and effective data analysis to interpret the history of seized nuclear materials. This approach has been adopted by many nations as they respond to incidents of illicit nuclear trafficking

  5. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  6. Working plan BDG 91/92

    International Nuclear Information System (INIS)

    1991-09-01

    This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs

  7. A working plan for working group 2 'enrichment' within the scope of INFCE

    International Nuclear Information System (INIS)

    1977-01-01

    A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries

  8. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2010-05-14

    ..., ramp rates, and network topology), flexible dispatch, settlement calculations, transmission switching... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission...

  9. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  10. Presentation of the G-24 technical working group on training

    International Nuclear Information System (INIS)

    Haber, S.

    1993-01-01

    The Technical Working Group on Training (TWG-T) was created during the Plenary Session of September 1992 in order to inform the Members on ongoing activities in the Nuclear Training field, define redundancies and gaps of the ''Assistance Programs'', and propose efficient ways to progress. Training was recognized as one major activity through which operational safety can be very effectively and quite quickly improved and therefore the Plenary Session unanimously decided to launch a TWG on the subject. The present report is issued one year after the creation of the TWG. It summarizes the major steps of the activities and presents the relevant results. It also contains copies of documents on training infrastructures and requirements, provided by the recipient countries during the course of the work

  11. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  12. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  13. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  14. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  15. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  16. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    Science.gov (United States)

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  17. International technical working group cooperation to counter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Niemeyer, S.

    2004-01-01

    The Nuclear Smuggling International Technical Working Group (ITWG) is an international group of nuclear forensic experts that cooperate to deter the illicit trafficking of nuclear materials. The objective of the ITWG is to provide a common approach and effective technical solutions to governments who request assistance in nuclear forensics. The ITWG was chartered in 1996 and since that time more than 28 nations and organizations have participated in 9 international meetings and 2 analytical round-robin trials. Soon after its founding the ITWG adopted a general framework to guide nuclear forensics investigations that includes recommendations for nuclear crime scene security and analysis, the best application of radioanalytical methods, the conduct of traditional forensic analysis of contaminated materials, and effective data analysis to interpret the history of seized nuclear materials. This approach has been adopted by many nations as they respond to incidents of illicit nuclear trafficking. ITWG members include policy and decision makers, law enforcement personnel, and scientists with expertise in, and responsibility for, nuclear forensics. (author)

  18. Interiors Construction Manual integrated planning, finishing and fitting out, technical servcies

    CERN Document Server

    Hausladen, Gerhard

    2010-01-01

    Soccer stadiums, airports, theaters, museums it falls to very few architects to tackle spectacular building tasks like these. The everyday work of most architects is more often focused on ""manageable"" projects like the renovation, remodeling, or rebuilding of single- and multi-family houses, schools, and offices. Whatever the nature of the building task, interior construction is always a significant design and qualitative challenge that calls for highly detailed technical expertise. After all, it affects the realm that will be brought to life and utilized by the user when the task is finished, and whose aesthetic and functional serviceability will be put to the test each and every day. The Interior Construction Manual supports planners in their daily work as a practical planning aid and reference work with the relevant standards, guidelines, reference details, and constructional solutions, all illustrated by built example projects. It brings together the crucial facts on all aspects of interior construction...

  19. International technical working group cooperation to counter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.

    2004-01-01

    Full text: The Nuclear Smuggling International Technical Working Group (ITWG) is an international group of nuclear forensic experts that cooperate to deter the illicit trafficking of nuclear materials. The objective of the ITWG is to provide a common approach and effective technical solutions to governments who request assistance in nuclear forensics. The ITWG was chartered in 1996 and since that time more than 28 nations and organizations have participated in 9 international meetings and 2 analytical round-robin trials. Soon after its founding the ITWG adopted a general framework to guide nuclear forensics investigations that includes recommendations for nuclear crime scene security and analysis, the best application of radioanalytical methods, the conduct of traditional forensic analysis of contaminated materials, and effective data analysis to interpret the history of seized nuclear materials. This approach has been adopted by many nations as they respond to incidents of illicit nuclear trafficking. ITWG members include policy and decision makers, law enforcement personnel, and scientists with expertise in, and responsibility for, nuclear forensics. It remains an association of active practitioners of nuclear forensics underwritten by funding from sponsoring countries and organizations. While the primary mission of the ITWG continues to be advancing the science and techniques of nuclear forensics and sharing technical and information resources to combat nuclear trafficking, recently the ITWG has focused on improvements to its organization and outreach. Central is the establishment of guidelines for best practices in nuclear forensics, conducting international exercises, promoting research and development, communicating with external organizations, providing a point-of-contact for nuclear forensics assistance, and providing mutual assistance in nuclear forensics investigations. By its very nature nuclear trafficking is a transboundary problem; nuclear materials

  20. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  1. Year-end technical stop: train to work safely

    CERN Multimedia

    Rosaria Marraffino

    2016-01-01

    As mentioned in the previous issue of the Bulletin (see here), the accelerators are currently undergoing maintenance as part of the year-end technical stop (YETS). Hundreds of people are working simultaneously on different machines, and many of them need to be trained in order to work safely underground. From a Safety Training point of view, this has resulted in a significant increase in training requests, most of them at the last minute, which are now being handled – but not without difficulties.     In the LHC mock-up, a helium leak is simulated. In this stressful situation, the trainees learn how to put their mask on in less than 40 seconds.   "The most requested course is the Self-Rescue Mask classroom training,” explains Christoph Balle, Safety Training Section Leader. “In this course, people are trained to face the oxygen deficiency hazards that may occur in CERN's underground areas, learning...

  2. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  3. An investigation of dematerialization planning options at tourism destinations: Technical and behavioural dimensions

    OpenAIRE

    Kelly, Joseph

    2006-01-01

    The goal of this dissertation is to develop a conceptual framework and associated methods for evaluating alternative tourism planning strategies in terms of dematerialization and acceptability amongst tourists. Its objectives are to (1) examine the technical potential of dematerialization planning options in tourism destinations, (2) investigate tourist perspectives concerning destination planning alternatives that promote dematerialization, (3) assess the travel market responses and demateri...

  4. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  5. Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)

    International Nuclear Information System (INIS)

    Beck, J.E.; Ison, S.A.

    1994-01-01

    This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completion of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions

  6. Migration plans and hours of work in Malaysia.

    Science.gov (United States)

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  7. Technical Basis for Radiological Emergency Plan Annex for WTD Emergency Response Plan: West Point Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hickey, Eva E.; Strom, Daniel J.

    2005-08-01

    Staff of the King County Wastewater Treatment Division (WTD) have concern about the aftermath of a radiological dispersion event (RDE) leading to the introduction of significant quantities of radioactive material into the combined sanitary and storm sewer system in King County, Washington. Radioactive material could come from the use of a radiological dispersion device (RDD). RDDs include "dirty bombs" that are not nuclear detonations but are explosives designed to spread radioactive material (National Council on Radiation Protection and Measurements (NCRP) 2001). Radioactive material also could come from deliberate introduction or dispersion of radioactive material into the environment, including waterways and water supply systems. This document, Volume 3 of PNNL-15163 is the technical basis for the Annex to the West Point Treatment Plant (WPTP) Emergency Response Plan related to responding to a radiological emergency at the WPTP. The plan primarily considers response to radioactive material that has been introduced in the other combined sanitary and storm sewer system from a radiological dispersion device, but is applicable to any accidental or deliberate introduction of materials into the system.

  8. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  9. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  10. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  11. Methodology of technical analysis to reduce cost in the planning of the works of 'Energy for All' program in Sao Paulo, Brazil; Metodologia de analise tecnica para reducao de custo no planejamento das obras do programa 'Luz para Todos' em Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Betiol Junior, Genesio; Strazzi, Paulo Ernesto; Carmo, Jose R. do; Ribeiro, Fernando Selles [Comissao de Eletrificacao Rural do Estado de Sao Paulo (CERESP), SP (Brazil)

    2006-07-01

    This article relates the development of a research about low cost for rural electrification projects, which have been used like a base to develop a technical analysis in whole projects of the program 'Luz para Todos'. This program was made in 2002 with the purpose to offer electricity for whole people in Brazilian rural area. This method was developed seeking in to achieve cost reduction in the planning made by electric companies in Sao Paulo state. At first, were analyzed the rural electric projects made by electricity companies in the program 'Luz da Terra', in front of to the commitment in achieving cost reduction in the rural electric projects. The program 'Luz da Terra' was made whit a social purpose and it was developed in the whole Sao Paulo state, during 1996 until 2004. One of the main demands to achieve reasonable costs and to allow the program's viability was the previous analyses of rural distribution projects, before them changing to work of electricity, checking out if they had well defined. social, technical and economics methods. For that, were chosen quantitative and non-quantitative indicators, agreement whit a comparative analysis of each company performance in the program 'Luz da Terra', in agreement whit historical series, based on the group of the final result of each distribution electricity project. In a second moment, the same methodology was adjusted to confront the plans data of each company's future works in the program 'Luz para Todos', using the results of the first program. The research allowed the identification of some planner's tendencies when developing from a more rigorous model of low cost, like was the program 'Luz da Terra', to the actual program 'Luz para Todos'. Applied to all companies in the Sao Paulo state, the study served as a support to renegotiate budgets, what provided savings of more than US$ 10,000.000 in a total of 42

  12. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  13. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  14. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  15. Technical Paper on Physical Planning and Monitoring Tools

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    and maintenance of such buildings.    Further, the paper outlines a number of physical planning and building tools to guide future planning and design development, and it suggests a range of action-oriented operational evaluation studies in order to improve the physical learning environment....

  16. Succession Planning in a Two-Year Technical College System

    Science.gov (United States)

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  17. 48 CFR 2452.237-73 - Conduct of Work and Technical Guidance.

    Science.gov (United States)

    2010-10-01

    ... conditions of the contract. (c) The GTR will issue technical guidance in writing or, if issued orally, he/she... Technical Guidance. 2452.237-73 Section 2452.237-73 Federal Acquisition Regulations System DEPARTMENT OF... Provisions and Clauses 2452.237-73 Conduct of Work and Technical Guidance. As prescribed in 2437.110(d...

  18. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    Science.gov (United States)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  19. Savannah River Plant, Works Technical Department monthly progress report for March 1956

    International Nuclear Information System (INIS)

    1956-01-01

    This document details activities of the Works Technical Department during the month of March 1956. It covers reactor technology, separations technology, engineering assistance and heavy water technology

  20. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  1. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  2. Annotated bibliography of structural equation modelling: technical work.

    Science.gov (United States)

    Austin, J T; Wolfle, L M

    1991-05-01

    Researchers must be familiar with a variety of source literature to facilitate the informed use of structural equation modelling. Knowledge can be acquired through the study of an expanding literature found in a diverse set of publishing forums. We propose that structural equation modelling publications can be roughly classified into two groups: (a) technical and (b) substantive applications. Technical materials focus on the procedures rather than substantive conclusions derived from applications. The focus of this article is the former category; included are foundational/major contributions, minor contributions, critical and evaluative reviews, integrations, simulations and computer applications, precursor and historical material, and pedagogical textbooks. After a brief introduction, we annotate 294 articles in the technical category dating back to Sewall Wright (1921).

  3. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  4. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  5. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  6. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  7. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  8. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  9. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    Spring chinook salmon populations in the Imnaha and Grande Ronde rivers are listed as threatened under the Endangered Species Act (ESA) and are at high risk of extirpation. The Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation, and Oregon Department of Fish and Wildlife, are co-managers of conservation/restoration programs for Imnaha and Grande Ronde spring chinook salmon that use hatchery supplementation and conventional and captive broodstock techniques. The immediate goal of these programs is to prevent extirpation and provide the potential for restoration once factors limiting production are addressed. These programs redirect production occurring under the Lower Snake River Compensation Plan (LSRCP) from mitigation to conservation and restoration. Both the Imnaha and Grande Ronde conservation/restoration programs are described in ESA Section 10 permit applications and the co-managers refer to the fish production from these programs as the Currently Permitted Program (CPP). Recently, co-managers have determined that it is impossible to produce the CPP at Lookingglass Hatchery, the LSRCP facility intended for production, and that without additional facilities, production must be cut from these conservation programs. Development of new facilities for these programs through the Columbia Basin Fish and Wildlife Program is considered a new production initiative by the Northwest Power Planning Council (NPPC) and requires a master plan. The master plan provides the NPPC, program proponents and others with the information they need to make sound decisions about whether the proposed facilities to restore salmon populations should move forward to design. This master plan describes alternatives considered to meet the facility needs of the CPP so the conservation program can be fully implemented. Co-managers considered three alternatives: modify Lookingglass Hatchery; use existing facilities elsewhere in the Basin; and use new facilities in

  10. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  11. Technical Working Group on Career and Technical Education Meeting. Meeting Summary (Washington, DC, September 22, 2017)

    Science.gov (United States)

    Ahn, Judie

    2017-01-01

    On September 22, 2017, the National Center for Special Education Research (NCSER) and the National Center for Education Research (NCER) at the Institute of Education Sciences (IES) convened a group of experts in policy, practice, and research related to Career and Technical Education (CTE). The goal of the meeting was to seek input from…

  12. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  13. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  14. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    Science.gov (United States)

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  15. 7 CFR 1924.5 - Planning development work.

    Science.gov (United States)

    2010-01-01

    ... cash to be furnished by the borrower, proceeds from cost sharing programs such as Agricultural...) Drawings, specifications, and estimates will fully describe the work. Technical data, tests, or engineering... building code. (i) Agricultural buildings that are not intended for human habitation are exempt from these...

  16. Robot Plans and Human Plans: Implications for Models of Communication. Technical Report No. 314.

    Science.gov (United States)

    Bruce, Bertram

    People in interaction with others organize their perceptions of a social situation in terms of plans even when the others' plans are poorly formulated. They use their models of others' plans in formulating their own. Much of what occurs in discourse centers on a continual communication about and reformulation of one's own plans and one's own…

  17. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  18. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  19. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  20. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2010-01-01

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  1. Applying Planning Algorithms to Argue in Cooperative Work

    Science.gov (United States)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  2. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  3. Next Generation Nuclear Plant Methods Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  4. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  5. Statements of work handbook. [technical writing for NASA programs

    Science.gov (United States)

    1975-01-01

    Guidelines are presented for preparing statements of work (SOW) to assure a consistent approach throughout NASA. Statements of work for study and preliminary definition contracts, for definition and development of major systems, for support services, and for small research and development contracts are discussed.

  6. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  7. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  8. Technical architecture of ONC-approved plans for statewide health information exchange.

    Science.gov (United States)

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  9. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    Science.gov (United States)

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  10. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  11. Zur Rolle von Plansprachen im terminologiewissenschaftlichen Werk von Eugen Wuster (The Role of Planned Languages in Eugen Wuster's Work on Terminology Science).

    Science.gov (United States)

    Blanke, Detlev

    1998-01-01

    Discusses the relationship between planned languages and specialized technical languages, with particular reference to Esperanto, and analyzes its significance for several aspects of Eugen Wuster's (the founder of terminology science) work. (Author/VWL)

  12. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  13. Technical Working Group on Fast Reactors: German Report

    International Nuclear Information System (INIS)

    Maschek, W.

    2012-01-01

    General German situation: • After Fukushima decision to phase out definitely until 2022; • Currently only 9 reactors left (2 BWRs and 7 PWRs); • Start of new search for final repository all over Germany (salt, clay); • Discussion on retrievable repository; • Search for methods to reduce risk from waste repositories. Future prospects: • Continuation of work within EU programs; • Continuation of work within international organizations (IAEA, NEA-OECD); • New CRP‘s are of interest; • Education and training; • Focus on safety: prevention and mitigation; • Embedded in work on transmutation and waste treatment; • Cycle studies to demonstrate both sustainability potential and waste burning capability (reduced loads for final repositories) of FR

  14. 77 FR 19280 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2012-03-30

    ... concerns that current system data quality might not allow for an AC optimal power flow model to be properly... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...

  15. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  16. Innovation and the organisation of technical expertise and work

    DEFF Research Database (Denmark)

    Howells, John

    This paper reviews a selection of the comparative research on the organisation of skills and work in different countries. It argues that despite differences in institutional means, such as keiretsu and structured apprenticeship, the ends, in terms of a capacity to organise skills, is similar. It ...... of what makes an effective technology manager. The conclusion is that in the most effective cases, whatever the institutional means that allows training, the object is the integration of formal academic knowledge with a structured and broad base of work experience...

  17. Student Centric Learning Through Planned Hard work - An Innovative Model

    OpenAIRE

    Aithal, Sreeramana; Aithal, Shubrajyotsna

    2016-01-01

    The strategies followed by educational institutions and the students become very important when the performance of students in the examinations is concerned. By means of properly planned and well guided model of training and motivation to do hard work, students can follow a well disciplined study plan and become exceptionally successful in examinations. Teaching and training by experienced and dedicated faculty members, continuous support by parents and motivating the students based on settin...

  18. "Good Work Awards:" Effects on Children's Families. Technical Report #12.

    Science.gov (United States)

    Chun, Sherlyn; Mays, Violet

    This brief report describes parental reaction to a reinforcement strategy used with children in the Kamehameha Early Education Program (KEEP). Staff members report that "Good Work Awards" (GWAs) are viewed favorably by mothers of students. GWAs are dittoed notes sent home with children when they have met a minimum criterion for daily…

  19. Report of results on the research and development work 1979 of the Institute for Technical Chemistry

    International Nuclear Information System (INIS)

    1980-02-01

    The results report on the research and development work in 1979 carried out at the Institute for Technical Physics of the Nuclear Research Centre, Karlsruhe is concerned here. The main field of this development work is the research into superconducting magnets for fusion reactors. Studies are published on the material, processing and shape of these magnets. Furthermore, a report is given on fusion magnet technology, superconducting fundamentals and technical superconductors, as well as an cryonergy technique and cryotechnique. (KBI) [de

  20. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  1. Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage

    International Nuclear Information System (INIS)

    Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho

    2005-01-01

    Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work

  2. Biking to work in Miami. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Kerr, O.

    1982-08-01

    The objective of the project was to produce and distribute a guide to commuting by bicycle in the Miami metropolitan area. The area is uniquely suited to bicycling because of its pleasant year-round climate and relatively flat topography. Persuading even a small percentage of automobile commuters to try biking to work could result in substantial energy savings in Miami as in most other major metropolitan areas. Seven of the largest employment centers in the area were selected as major commuter destinations suitable for bicycle commuters. Safe and scenic ways of commuting to these areas by bicycle were mapped and described in a series of short narratives. Additional material on safe riding techniques and the choice of equipment was developed. The resulting 40 page booklet, Biking to Work in Miami, was printed and distributed by the author to local cycling groups, bicycle interests, and others. Copies were also sent to interested parties outside the Miami area. The initial reception has been very encouraging and a number of favorable reply cards have been received with useful comments and suggestions. A revised version aimed at stimulating bikers to avail of the soon-to-be-opened rapid transit system is being considered. A writer for the Miami Herald is interested in using parts of the Guide for a series in the newspaper.

  3. Technical isomorphism at work : ERP-embedded similarity-enhancing mechanisms

    NARCIS (Netherlands)

    Batenburg, Ronald; Benders, Jos; van der Blonk, Heico

    2008-01-01

    Purpose - The purpose of this paper is to discuss the mechanisms inducing a user organization to conform with enterprise resource planning (ERP)-embedded organizational logics and accompanying implementation procedures. Design/methodology/approach - Based around the notion of technical isomorphism,

  4. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  5. SUPERFUND TREATABILITY CLEARINGHOUSE: WORK PLAN FOR BIODEGRADATION OF POLY-CHLORINATED BIPHENYLS (PCBS) AT A SUPERFUND SITE

    Science.gov (United States)

    This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...

  6. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  8. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  9. Report of the National Technical Planning Group on Uranium Tailings Research

    International Nuclear Information System (INIS)

    Lapp, P.A.

    1981-09-01

    The National Technical Planning Group on Uranium Tailings Research was formed in 1980 to review present activities and plan a research program on the management of wastes after a mine and mill have shut down. At present there are more than 100 million tonnes of uranium tailings on the surface in Canada. Most of these are under management; however, some 8 million tonnes have been abandoned completely. The group concluded that: 1) there has been no systematic attempt to collect and organize the results of measurements already made on tailings; 2) there is an inadequate understanding of the processes that take place in tailings and in the pathways to the biosphere; 3) there is insufficient evidence on the extent of the long-term problem in the closeout of a uranium tailings basin; 4) there is a need to establish standardized measurement methodologies to improve the quality of data taken at different sites across Canada; 5) generic research and development on tailings disposal technology should be within the scope of a national program, whereas site-specific work is the purview of the mines and regulatory agencies; and 6) the uranium producers' contribution to the national tailings program should be their research on site-specific disposal alternatives. The first of these conclusions leads to the proposal to establish a national uranium tailings research program. The second suggests the need for a modelling program, the third and fourth for a national measurement program, and the remaining conclusions refer to disposal technologies research. The conclusions form the basis for a set of recommendations on uranium tailings research

  10. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  11. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  12. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  13. Technical aspects of positron emission tomography/computed tomography in radiotherapy treatment planning.

    Science.gov (United States)

    Scripes, Paola G; Yaparpalvi, Ravindra

    2012-09-01

    The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.

  14. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  15. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  16. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  17. School-to-Work Transition of Career and Technical Education Graduates

    Science.gov (United States)

    Packard, Becky Wai-Ling; Leach, Miki; Ruiz, Yedalis; Nelson, Consuelo; DiCocco, Hannah

    2012-01-01

    This study analyzed the career development of career and technical education (CTE) high school graduates during their school-to-work transition, specifically their adaptability in the face of barriers. Forty graduates (22 men, 18 women) from working-class backgrounds participated in baseline surveys at graduation and phenomenological interviews 1…

  18. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  19. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  20. Forty-Sixth Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The objectives of the meeting were to: • Review the current status and the progress since the 45th TWG-FR meeting of FR and ADS technology development activities in IAEA Member States; • Review the activities (past, present and planned) of the IAEA’s project 1.1.5.3, “Support for fast reactor research, technology development and deployment” to ensure that they remain relevant to the needs of Member States; • Provide the experts group with updates to advise the IAEA on FR and ADS activities, including on proposals for relevant studies and reviews; • Serve as a means for exchanging information on national and international FR and ADS programmes; • Review the main achievements and outcomes of the “International Conference on Fast Reactors and Related Fuel Cycle: Safe Technologies and Sustainable Scenarios – FR13”, held on 4 – 7 March 2013 in Paris, France; • Promote the exchange of technical information by proposing topics for, and assisting in the organization of, IAEA Workshops and Technical Meetings for 2014-2015 and further, and • Review the IAEA’s concluded, on-going and planned coordinated research projects (CRPs) in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, Euratom, etc.)

  1. The Nuclear Smuggling International Technical Working Group: Making a difference in combating illicit trafficking

    International Nuclear Information System (INIS)

    Niemeyer, S.; Koch, L.

    2002-01-01

    Full text: The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This 26-page report summarized previous work on nuclear forensics and gave an initial analysis on prioritizing techniques and methods for forensic analysis regarding source and route attribution. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in April, 1996, as part of an illicit trafficking program. The work of the ITWG has also been noted at subsequent summit declarations, e.g. Cologne. The ITWG's primary goal is to develop a preferred approach to nuclear forensic investigations that is widely understood and accepted as credible. The technical elements include: 1) development of protocols for a) collection and preservation of evidence and b) for laboratory investigation, 2) prioritizing of techniques for forensic analysis, 3) development of forensic databanks to assist in interpretation, 4) executing inter-laboratory exercises, and 5) facilitating technical assistance to countries upon request. The development of protocols has been conducted jointly by law enforcement officials and laboratory scientists. A major focus during much of the past six years has been the development of a model action plan for nuclear forensics. This action plan lays out the elements that are needed in the instance that illicit nuclear material is

  2. The primary organization of accounting in budgetary institutions of Ukraine: development of the work plan accounts

    Directory of Open Access Journals (Sweden)

    Svirko S.V.

    2017-03-01

    Full Text Available The questions of primary accounting of economic activity of budgetary institutions in the modernization budget accounting subsystem. With the object of study chosen mechanism for building and operating its own chart of accounts of economic activity of budgetary institutions. In order to develop a thesaurus budget accounting formed the definition of «work plan accounts economic activity of budgetary institutions». The approaches to determining impacts, principles and stages of construction work plan accounts, based on what model of development formed a working plan of accounts of economic activity of budgetary institutions, based on the combined general and technical principles and allows for certain vectors regulatory impact. The necessity of formation at the Ministry of Finance of Ukraine three typical plans for major accounts of the public sector. Based on the study of the Chart of Accounts in the public sector generated and presented a typical chart of accounts of budget institutions. Conclusions about the necessity of forming mechanism of development of analytical accounts for different entities public sector.

  3. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    Science.gov (United States)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  4. COMPUTER-BASED SYSTEMS OF PHYSICAL EXPERIMENT IN INDEPENDENT WORK OF STUDENTS OF TECHNICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Iryna Slipukhina

    2016-11-01

    Full Text Available Purpose: The self-study activity of students is an important form of educational process under the conditions of rapid changes of technologies. Ability and readiness of future engineers for independent education is one of their key competences. Investigation of modern methods of planning, organization and control of independent cognitive activity of students while studying physics as effective means of complex forming of their professional qualities is the object of the research. Methods: We analyse the curricula of some engineering specialities in leading technical universities, existent methods and forms of organization of students’ self-study, and own pedagogical experience. Results: Based on the theoretical analysis of existing methods of students’ self-study, it was found that a systematizing factor of appropriate educational technology is the problem focused cognitive tasks. They have to be implemented by application of the modern technological devices integrated with a computer-based experiment. We define the aim of individual or group laboratory works; the necessary theoretical and practical knowledge and skills of students are rationalized; timing and form of presentation of the results are clarified after individual and group consulting. The details of preparatory, searching-organizational, operational, and control stages in organization of students’ self-study with the use of computer oriented physical experiment are specified, these details differ depending on the didactic purpose, form of organization and students’ individuality. Discussion: The research theoretical aspect confirms the determining role of subject-subject cooperation in forming of competences of independent learning of the future engineers. Basic practical achievements of the research consist of improving methods of using of digital learning systems, creation of textbooks that promote consultative and guiding role for the educational process, working-out of

  5. [Analysis of work-related fatigue characteristics and its influencing factors in scientific and technical personnel].

    Science.gov (United States)

    Yang, Ting; Zhou, Dinglun; Song, Mingying; Lan, Yajia

    2015-02-01

    To investigate the current status and characteristics of work-related fatigue among scientific and technical personnel and its associated factors, and to provide a scientific basis for further interventions. A cross-sectional survey was conducted in the staff from a single scientific institution, using a self-administered questionnaire. Basic information of participants, Fatigue Scale-14, and Job Content Questionnaire were collected. The prevalence of work-related fatigue among the scientific and technical personnel was 54.6%; work-related fatigue was positively correlated with occupational stress (rs = 0.384, P work-related fatigue included occupational stress profiles, social support, and educational status. A higher risk of work-related fatigue was found in the staff under high stress, compared with those under low stress (OR = 8.5, 95%CI = 3.9∼18.7). Social support served as a protective factor for work-related fatigue, while a higher level of education was correlated with more severe work-related fatigue. Work-related fatigue is common and serious among scientific and technical personnel, especially in those under high stress. Effective interventions according to occupational stress are of great importance to reduce work-related fatigue.

  6. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  7. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  8. Technical skills requirement of Indonesian construction labors to work in Malaysia

    Science.gov (United States)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  9. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  10. [Fortieth Annual] Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2008-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 39th TWG-FR Annual Meeting, including the status of the actions; - Consider meeting arrangements for 2007, 2008 and 2009; - Review the Agency’s ongoing information exchange and co-ordinated research activities in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations; - Discuss future joint activities in view of the Agency’s Programme and Budget Cycle 2008–2009 (and beyond)

  11. Report of working group for technical standard of cutting and melting works in Glovebox dismantling

    International Nuclear Information System (INIS)

    Asazuma, Shinichiroh; Takeda, Shinsoh; Tajima, Shoichi

    2004-11-01

    In order to prevent spread of contamination, glovebox dismantling activity is usually performed in a confined enclosure with personal radioactive protective equipment. Since large potion of these materials is made of vinyl acetate, there exist potential risks of fire, damage and injury to the environment and workers during the dismantling (cutting or melting) operation. It is therefore important to establish standard for proper use of equipment and hazard controls in such a specific environment. Working Group composed of Tokai Works and Oarai Works has examined and developed the operational standard for cutting work in glovebox dismantlement. The result is reflected to the Tokai Works Safety Operational Standard. (author)

  12. Three-Dimensional Path Planning Software-Assisted Transjugular Intrahepatic Portosystemic Shunt: A Technical Modification

    Energy Technology Data Exchange (ETDEWEB)

    Tsauo, Jiaywei, E-mail: 80732059@qq.com; Luo, Xuefeng, E-mail: luobo-913@126.com [West China Hospital of Sichuan University, Institute of Interventional Radiology (China); Ye, Linchao, E-mail: linchao.ye@siemens.com [Siemens Ltd, Healthcare Sector (China); Li, Xiao, E-mail: simonlixiao@gmail.com [West China Hospital of Sichuan University, Institute of Interventional Radiology (China)

    2015-06-15

    PurposeThis study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS).Methods3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate the angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients.ResultsFailure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures.ConclusionsAdjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.

  13. A socio-technical analysis of work with ideas in NPD: an industrial case study

    DEFF Research Database (Denmark)

    Gish, Liv; Hansen, Claus Thorp

    2013-01-01

    on piecing together a number of ideas that were developed and disseminated in a large industrial company. We do this through an in-depth case study of the development of the energy-labeled circulation pump Alpha Pro, developed by one of the world’s leading pump manufacturers, Grundfos. Using a socio-technical...... approach, we focus especially on the actors involved and the contextual factors, and less on the detailed development of technical ideas. In our study, we observe that (1) ideas are pieced together from previous ideas and results; (2) ideas are implemented through continuous mobilization of support...... and development of legitimate arguments; and (3) idea work is also a socio-technical process, because contextual factors matter. We observe that idea work is an ongoing process undertaken across different projects, actors, departments, strategies, and visions within Grundfos, while also involving external actors...

  14. Work plan, AP-102 mixer pump removal and pump replacement

    International Nuclear Information System (INIS)

    Jimenez, R.F.

    1994-01-01

    The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken

  15. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-31

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

  16. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    International Nuclear Information System (INIS)

    Li, Jun

    2016-01-01

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator's approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

  17. Report of results and of research and development work at the Institute of Technical Physics 1991

    International Nuclear Information System (INIS)

    1992-03-01

    The central areas of work are superconductivity and its applications, cryo-technology and microwave technology. The main point of technical development is the construction of magnets for the nuclear fusion project NET/ITER. Basic investigations concern low temperature and superconductor materials such as YBa 2 Cu 3 O 7-x single crystals. (DG) [de

  18. 76 FR 21043 - Notice of Public Meeting: Technical Aspects of Mandatory Deposit of Published Electronic Works...

    Science.gov (United States)

    2011-04-14

    ... mandatory deposit requirements of the copyright law. The objective is to identify file submission, packaging... mandatory deposit provisions of the copyright law. Under the interim regulation, certain works available... LIBRARY OF CONGRESS Copyright Office [Docket No. 2011-3] Notice of Public Meeting: Technical...

  19. Academic & Technical Skills + Life/Work Skills + Career Information & Guidance = Success in Career Building.

    Science.gov (United States)

    Jarvis, Phillip S.

    There has been a renaissance in the thinking about career development. It is becoming accepted that information is not enough; in addition to academic and technical skills, youth and adults need to learn life/work designing and building skills to become healthy, productive, and self-reliant citizens. Despite the fact that Canadian students have…

  20. In situ vitrification laboratory-scale test work plan

    International Nuclear Information System (INIS)

    Nagata, P.K.; Smith, N.L.

    1991-05-01

    The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs

  1. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    Science.gov (United States)

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  2. Planning and implementation of Istanbul Technical University TRIGA research reactor program

    International Nuclear Information System (INIS)

    Aybers, N.; Yavuz, H.; Bayulken, A.

    1982-01-01

    The Istanbul Technical University TRIGA Research Reactor at the Institute for Nuclear Energy, which went critical on March 11, 1979 is basically a pulsing type TRIGA Mark - II reactor. Completion of the ITU-TRR contributed to broaden the role of the Institute for Nuclear Energy of the Technical University in Istanbul in the nuclear field by providing for the first time adequate on-campus experimental facilities for nuclear engineering studies to ITU students. The research program which is currently under planning at ITU-NEE encompasses: a) Neutron activation analysis studies by techniques and applications to chemistry, mining, materials research, archaeological and biomedical studies; b) applications of Radioisotopes; c) Radiography with reactor neutron beams; d) Radiation Pulsing

  3. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  4. Methodological approach to participatory formulation of agricultural technical assistance plans with territorial approach

    Directory of Open Access Journals (Sweden)

    Holmes Rodríguez Espinosa

    2015-10-01

    Full Text Available The collective identification of needs and shared decision-making in projects’ formulation for agricultural development is a process that requires the identification of participatory methodologies to promote active and reflective engagement of producers. The aim of this study was to evaluate a methodological approach for participatory formulation of technical assistance plan with territorial approach. Matrix analysis for the identification and prioritization of the most limiting technical assistance factors for milk production was performed and alternative solutions were defined, through participatory workshops with farmers. The results show the advantages of a collective reflection with stakeholders and quantitative tools reducing subjectivity in decision-making, improving participation in their own development and identifying acceptable alternatives to farmers and viable to the municipality in order to improve lack of pasture and forage management, implementation of good agricultural practices GAP and rational use of agrochemicals.

  5. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The discussion which followed the different presentations highlighted the following points: • All the Member States representatives participating in the technical meeting welcomed this IAEA initiative and expressed their potential interest in contributing to the catalogue; • Not all the countries with a fast reactor programme were represented at the meeting. In particular, it was noted that there was no participation from China, the Russian Federation and the USA. Even contribution from Sweden and Spain would be beneficial. It will be a task of the IAEA Secretariat to try involving also these countries in the preparation of the catalogue; • The catalogue will focus only on experimental facilities supporting development of liquid metal cooled fast reactors (Sodium, Lead and Lead-Bismuth). For the time being, facilities in support of GFR and MSR research will not be included; • As for countries involved in HLM technology research, only European countries were participating at the meeting, i.e. Belgium, France, Italy and Germany. In order to avoid duplication of the work performed within the European project ADRIANA, representatives from these countries underlined that a condition for their contribution to the IAEA catalogue is the involvement of non-European countries with HLM research programmes; • The advice from the Member States is fundamental to clearly define scope, objectives and content of the catalogue. The plan for its drafting has also to be further discussed with Member States representatives; • The catalogue is also intended to identify gaps and future needs that require further R&D initiatives; • The catalogue will be a useful tool to set up international collaboration

  6. THE TECHNICAL AND ETHNICAL DIVISION OF WORK, THE INDIGEOUS GROUPS AND THE FAMILY BUSINESSES

    OpenAIRE

    Gloria A. Miranda-Zambrano; Ricardo Contreras-Soto; Alejandra López-Salazar

    2013-01-01

    The work exposes some forms of indigenous groups participation on entrepreneurial family businesses, mainly in the region of Laja - Bajío where the family plays an important role in these organizations. The work point out the approach on technical ethnic division of labour to locate such actors in labour circuits, in economic activities or guilds that have been built in various social processes. To analyze the ways in which they operate, the role of the family, their knowledge (cultural capit...

  7. Nuclear power plant diagnostics - Safety aspects and licensing. Report of a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    1997-01-01

    The aim of the Technical Committee Meeting (TCM) was to review developed systems and methods in diagnostics in the scope of their impacts and importance to the safety of Nuclear Power Plants. Papers presented on TCM came from different sources, from developers, from manufacturers, from licensing authorities and from NPP personal. They reflect up to date status in the given subject. Participants of TCM formulated three working groups to elaborate different questions which were raised during the discussions. Their results are reflected in the three chapter titles of the given material. Annex 1 to this document contains presentations made at the Technical Committee Meeting. Refs, figs, tabs

  8. New handling systems as technical support for the working process. Part 6. Feeding devices

    Energy Technology Data Exchange (ETDEWEB)

    Becher, H; Burkhardt, R; Drexel, P; Graf, B; Krreis, W

    1982-03-01

    Social, technical and economic reasons require an enhanced application of handling systems such as industrial robots. Quality and efficiency of an industrial robot depends greatly on feeding devices, and the ARGE-HHS within its project new handling systems as a technical aid in the working process intends to analyze all feeding devices that are likely to be most suitable for advanced applications. Forty one feeding devices were developed, known devices were modified, adapted to different applications, and tested. A variety of feeding devices for most applications in the field of material handling is reported.

  9. A plan of radiation work market on the web

    International Nuclear Information System (INIS)

    Nakagawa, Haruo; Chino, Koichi

    2002-01-01

    In Japan there are many kinds of radiation facilities, and a great number of radiation employees are engaged in plant repairing. It is therefore, very important to strive for employee controls, radiation controls, health examinations and data control. Furthermore, it is necessary to establish a total data management system that processes numerous amounts of data concerning radiation employees. The present paper proposes the establishment of a radiation work market on the web using a total data management system. The system will include radiation employee control information service for members who are planning new employment contracts. (author)

  10. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  11. In-well vapor stripping drilling and characterization work plan

    International Nuclear Information System (INIS)

    Koegler, K.J.

    1994-01-01

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable

  12. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  13. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  14. CERN Technical Training 2002: Learning for the LHC! CLEAN-2002: WORKING IN A CLEAN ROOM

    CERN Multimedia

    Davide Vitè

    2002-01-01

    CLEAN-2002 is a new, free of charge, half-day seminar in the context of Technical Training for the LHC. The course is designed for personnel working or managing activities in an assembly cleanroom, for example physicists, engineers and technicians working at or visiting the laboratory. CLEAN-2002 is aimed at raising awareness about good working practices in a cleanroom, and at providing practical examples, analysis tools, and documentation. Specific problems put forward beforehand by attendees will also be addressed. If you are interested in CLEAN-2002, please discuss with your supervisor or your DTO. More information and online registration by EDH are available from the Technical Training pages. The next session, in English, will be on 10 October (afternoon). Other sessions, in French and English, will be offered following demand: the first session in French will be organised in November. Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch

  15. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  16. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  17. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  18. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  19. Gas-cooled reactor technology safety and siting. Report of a technical committee meeting. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    At the invitation of the Government of the Union of Soviet Socialist Republics, the Eleventh International Conference on the HTGR and the IAEA Technical Committee Meeting on Gas-Cooled Reactor Technology, Safety and Siting were held in Dimitrovgrad, USSR, on June 21-23, 1989. The Technical Committee Meeting provided the Soviet delegates with an opportunity to display the breadth of their program on HTGRs to an international audience. Nearly one-half of the papers were presented by Soviet participants. Among the highlights of the meeting were the following: the diverse nature and large magnitude of the Soviet research and development program on high temperature gas-cooled reactors; the Government approval of the budget for the construction of the 30 MWt High Temperature Test Reactor (HTTR) in Japan (The schedule contemplates a start of construction in spring 1990 on a site at the Oarai Research Establishment and about a five year construction period.); disappointment in the announced plans to shutdown both the Fort St. Vrain (FSV) plant in the United States (US) and the Thorium High Temperature Reactor (THTR-300) in Germany (These two reactors presently represent the only operating HTGRs in the world since the AVR plant in Juelich, Germany, was also shutdown at the end of 1988.); the continuing negotiations between Germany and the USSR on the terms of the co-operation between the two countries for the construction of a HTR Module supplemented by joint research and development activities aimed at increasing coolant outlet temperatures from 750 deg. C to 950 deg. C; the continued enthusiasm displayed by both the US and German representatives for the potential of the small modular designs under development in both countries and the ability for these designs to meet the stringent requirements demanded for the future expansion of nuclear power; the combining of the HTGR technology interest of ABB-Atom and Siemens in Germany into a joint enterprise, HTR GmbH, in May 1989

  20. Gas-cooled reactor technology safety and siting. Report of a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    1990-01-01

    At the invitation of the Government of the Union of Soviet Socialist Republics, the Eleventh International Conference on the HTGR and the IAEA Technical Committee Meeting on Gas-Cooled Reactor Technology, Safety and Siting were held in Dimitrovgrad, USSR, on June 21-23, 1989. The Technical Committee Meeting provided the Soviet delegates with an opportunity to display the breadth of their program on HTGRs to an international audience. Nearly one-half of the papers were presented by Soviet participants. Among the highlights of the meeting were the following: the diverse nature and large magnitude of the Soviet research and development program on high temperature gas-cooled reactors; the Government approval of the budget for the construction of the 30 MWt High Temperature Test Reactor (HTTR) in Japan (The schedule contemplates a start of construction in spring 1990 on a site at the Oarai Research Establishment and about a five year construction period.); disappointment in the announced plans to shutdown both the Fort St. Vrain (FSV) plant in the United States (US) and the Thorium High Temperature Reactor (THTR-300) in Germany (These two reactors presently represent the only operating HTGRs in the world since the AVR plant in Juelich, Germany, was also shutdown at the end of 1988.); the continuing negotiations between Germany and the USSR on the terms of the co-operation between the two countries for the construction of a HTR Module supplemented by joint research and development activities aimed at increasing coolant outlet temperatures from 750 deg. C to 950 deg. C; the continued enthusiasm displayed by both the US and German representatives for the potential of the small modular designs under development in both countries and the ability for these designs to meet the stringent requirements demanded for the future expansion of nuclear power; the combining of the HTGR technology interest of ABB-Atom and Siemens in Germany into a joint enterprise, HTR GmbH, in May 1989

  1. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  2. Istra district heating system. General technical report. Appendix 1 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve the heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one issue for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers' lacking ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. The General Technical Report evaluates the technical situation and describes system improvements at a general level. The intention with this report is to provide important information useful to other district heating companies in Russia. (au)

  3. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  4. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  5. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  6. Facilitating computer supported cooperative work with socio-technical self-descriptions

    OpenAIRE

    Kunau, Gabriele

    2006-01-01

    How can the concept of self-description from newer systems theory be used for improving the co-evolvement of software engineering and organizational change in CSCW-projects? This thesis suggests transferring the concept of self-description into a concept of socio-technical self-description allowing an organization to describe its own computer supported work processes. The presentation of results is organized in four steps: First, a theoretical foundation is elaborated; second, an initial meth...

  7. Digital Instrumentation and Control working group (DICWG) - MDEP DICWG Programme Plan 2012 2013

    International Nuclear Information System (INIS)

    2012-02-01

    The Multinational Design Evaluation Programme (MDEP) Digital Instrumentation and Controls Working Group (DICWG) was approved by MDEP's Policy Group in March 2008 and meets approximately 3 times a year. All MDEP members and the IAEA are invited to participate in this working group's activities. The DICWG's main objectives are as follows: - to document common positions in the DI and C safety systems design areas; - to harmonise and converge national codes, standards and regulatory requirements and practices in this area while recognising the sovereign rights and responsibilities of national regulators in carrying out their safety reviews of new reactor designs (see the DICWG programme plan for more details of the group's work). The DICWG interacts regularly with the following organisations: - IEC (International Electro-technical Commission) Subcommittee 45A, Instrumentation and Control of Nuclear Facilities; - IEEE (Institute of Electric and Electronics Engineers); - other organisations involved in the design of digital I and C safety systems for nuclear power plants. The DICWG reports its status to the MDEP Steering Technical Committee at the latter's thrice annual meetings. This document presents the 2012 and 2013 programme plan and its products: the Generic Common Position DICWG-02 on Software Tools; the Generic Common Position DICWG-03 on Verification and Validation throughout the Life Cycle of Safety Systems Using Digital Computers; the Generic Common Position DICWG-04 on Communication Independence; the Generic Common Position DICWG-05 on Treatment of Hardware Description Language (HDL) Programmed Devices for Use in Nuclear Safety Systems; the Generic Common Position DICWG-06 on Simplicity in Design; the Generic Common Position DICWG-08 on Impact of Cyber Security Features on Digital I and C Safety Systems

  8. Technical Meeting on Impact of Fukushima Event on Current and Future Fast Reactor Designs. Working Material

    International Nuclear Information System (INIS)

    2012-01-01

    The overall purpose of the Technical Meeting was to recognize and analyse the implications of the accident occurred at the Fukushima Dai-ichi Nuclear Power Station on current and future fast neutron systems design and operation. The aim was to provide a global forum for discussing the principal lessons learned from this event, and thus to review safety principles and characteristics of existing and future fast neutron concepts, especially in relation with extreme natural events which potentially may lead to severe accident scenarios. The participants also presented and discussed innovative technical solutions, design features and countermeasures for design extension conditions - including earthquakes, tsunami and other extreme natural hazards - which can enhance the safety level of existing and future fast neutron systems. Furthermore, the meeting gave the opportunity to present advanced methods for the evaluation of the robustness of plants against design extension conditions. Another important goal of this TM was to discuss how to harmonize safety approaches and goals for next generation’s fast reactors. Finally, the meeting was intended to identify areas where further research and development in nuclear safety, technology and engineering in the light of the Fukushima accident are needed. In the frame of the implementation of its Nuclear Safety Action Plan endorsed by all Member States, the IAEA will consider these areas as potential technical topics for new Coordinated Research Projects, to be launched in the near future

  9. Technical Meeting on Passive Shutdown Systems for Liquid Metal-Cooled Fast Reactors. Working Material

    International Nuclear Information System (INIS)

    2015-01-01

    A major focus of the design of modern fast reactor systems is on inherent and passive safety. Specific systems to improve reactor safety performance during accidental transients have been developed in nearly all fast reactor programs, and a large number of proposed systems have reached various stages of maturity. This Technical Meeting on Passive Shutdown Systems for Fast Reactors, which was recommended by the Technical Working Group on Fast Reactors (TWG-FR), addressed Member States’ expressed need for information exchange on projects and programs in the field, as well as for the identification of priorities based on the analysis of technology gaps to be covered through R&D activities. This meeting was limited to shutdown systems only, and did not include other passive features such as natural circulation decay heat removal systems etc.; however the meeting catered to passive shutdown safety devices applicable to all types of fast neutron systems. It was agreed to initiate a new study and produce a Nuclear Energy Series (NES) Technical Report to collect information about the existing operational systems as well as innovative concepts under development. This will be a useful source for member states interested in gaining technical expertise to develop passive shutdown systems as well as to highlight the importance and development in this area

  10. Technical Meeting on Fast Reactors and Related Fuel Cycle Facilities with Improved Economic Characteristics. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    In recent years, engineering oriented work, rather than basic research and development (R&D), has led to significant progress in improving the economics of innovative fast reactors and associated fuel cycle facilities, while maintaining and even enhancing the safety features of these systems. Optimization of plant size and layout, more compact designs, reduction of the amount of plant materials and the building volumes, higher operating temperatures to attain higher generating efficiencies, improvement of load factor, extended core lifetimes, high fuel burnup, etc. are good examples of achievements to date that have improved the economics of fast neutron systems. The IAEA, through its Technical Working Group on Fast Reactors (TWG-FR) and Technical Working Group on Nuclear Fuel Cycle Options and Spent Fuel Management (TWG-NFCO), devotes many of its initiatives to encouraging technical cooperation and promoting common research and technology development projects among Member States with fast reactor and advanced fuel cycle development programmes, with the general aim of catalysing and accelerating technology advances in these fields. In particular the theme of fast reactor deployment, scenarios and economics has been largely debated during the recent IAEA International Conference on Fast Reactors and Related Fuel Cycles: Safe Technologies and Sustainable Scenarios, held in Paris in March 2013. Several papers presented at this conference discussed the economics of fast reactors from different national and regional perspectives, including business cases, investment scenarios, funding mechanisms and design options that offer significant capital and energy production cost reductions. This Technical Meeting on Fast Reactors and Related Fuel Cycle Facilities with Improved Economic Characteristics addresses Member States’ expressed need for information exchange in the field, with the aim of identifying the main open issues and launching possible initiatives to help and

  11. Direction of the methodological work in the Technical and Professional Education: the department bosses' preparation

    Directory of Open Access Journals (Sweden)

    Rolando Rodríguez Delgado

    2017-09-01

    Full Text Available The present work deals with the process of preparation of the heads of teaching departments for the direction of methodological work in Technical and Professional Education with the purpose of improving their professional performance with the collective of teachers and specialists in the continuous training of the worker. The results of the diagnosis made on this process revealed shortcomings because it is unsystematic and poorly contextualized, which does not allow to achieve a positive impact on the training of subordinates and students to join the world of work. For the development of the work we used the structural systemic methods, analysis and synthesis, induction and deduction, survey, interview, observation and statistical techniques such as percentage calculation, tables of frequencies and contingencies, which allowed to deepen the object of study and to elaborate a strategy of preparation for the heads of department like main result that is presented in this work. In order to verify the practical effectiveness of the proposed strategy, 12 heads of teaching departments of the polytechnic centers of the municipality of La Palma for the academic year 2014-2015 were studied and 5 managers, 69 teachers and 18 specialists of production and services. The evaluation of the results evidences advances in the preparation of the heads of departments and in their professional performance with teachers and specialist, according to the current requirements of the technical and professional continuing education of the worker in formation.

  12. Radiological, technical and financial planning for decommissioning of small nuclear facilities in Sweden - 16177

    International Nuclear Information System (INIS)

    Lindskog, Staffan; Sjoeblom, Rolf

    2009-01-01

    ,00 MSEK (about keuros 96 and k$ 135). It is found that the 'general advice' that must be used by smaller companies lacks proper instructions on how to account for environmental liability whilst at the same time it prohibits the use of e.g. the international reporting standards IFRS/IAS. It is also found that the 'general advice' prohibits distribution of costs for research and development over time. This might be incompatible with a fund system where considerable research may be necessary at the early stages of the work and often many years before the actual decommissioning is to take place. The rules in the penal code require that an annual report presents an 'essentially correct financial situation'. One of the interpretations to this statement is that a deviance of at most 30 % might be tolerated. Although previous work has indicated that the error in cost estimates need not be higher than about 15 %, even for research facilities, concealed cost raisers may from time to time lead to much larger errors, even when best practices are being used. It is therefore essential that decommissioning planning and cost predictions are made in accordance with state of the art, and that the estimating methods as well as the results are properly documented. (authors)

  13. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  14. THE CONCEPTION OF NURSING WORK BY STUDENTES AND TEACHERS FROM A TECHNICAL COURSE

    Directory of Open Access Journals (Sweden)

    Amailson Sandro Barros

    2016-12-01

    Full Text Available This article aims at presenting the conception of work envisioned by students and teachers from a technical course on nursing. For that end, we interviewed 12 students and 03 teachers from the course. The data was collected through structured interviews. The data obtained pointed to a concept of work relied on pleasure and satisfaction for caring, as well as source of remuneration, which is related to the ideological background perpetuated that associates nursing to dedication, obedience and material detachment. The speech of the participants disregards the shock between capital and labor and the social construction and historical exploitation of the workforce, keeping strongly the dogma of charity in the field of nursing. The reports pointed to the dual character of the work which comprises the abstract and concrete conceptions, leading to a division between intellectual labor versus manual work and precarization of labor in nursing and teaching.

  15. Record of Technical Change No.2 for ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    International Nuclear Information System (INIS)

    1999-01-01

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  16. An independent assessment of the technical feasibility of the Mars One mission plan - Updated analysis

    Science.gov (United States)

    Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier

    2016-03-01

    In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric

  17. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  18. Meeting of the Technical Working Group on Fast Reactors (TWG-FR) (39th annual meeting). Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The 39th Annual Meeting of the Technical Working Group on Fast Reactors (TWG FR) was held from 15-19 May 2006 in Beijing, China, at the invitation of the China Institute of Atomic Energy (CIAEA). The meeting was attended by TWG-FR Members and Advisers from the following Member States (MS): Belgium (observer), Brazil, China, France, Germany, India, Italy, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, Sweden (observer), the United Kingdom, and the United States. Belarus, Switzerland, the European Commission, and OECD/NEA were unable to participate. Moreover, Prof. Carlo Rubbia, CERN director general emeritus, participated, upon IAEA invitation, in the meeting as distinguished scientist and IAEA expert. Mr. S.C. Chetal, from India (Indira Gandhi Centre for Atomic Research, IGCAR), was appointed chairman. The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 38th TWG-FR Annual Meeting, including the status of the actions; - Consider meeting arrangements for 2006 and 2007; - Reviewed the Agency's ongoing information exchange and co-ordinated research activities in the technical fields relevant to the TWG-FR (FRs and ADS), as well as co-ordination of the TWG-FR's activities with other organizations; - Discuss future joint activities in view of the Agency's Programme and Budget Cycle 2008-2009 (and beyond)

  19. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  20. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  1. Technical Training Programme: Learning for the LHC ! CLEAN-2002: WORKING IN A CLEANROOM

    CERN Multimedia

    Davide Vitè

    2002-01-01

    CLEAN-2002 is a new, free of charge, half-day seminar in the context of Technical Training for the LHC. The course is designed for personnel working or managing activities in an assembly cleanroom, for example physicists, engineers and technicians working at or visiting the laboratory. CLEAN-2002 is aimed at raising awareness about good working practices in a cleanroom, and at providing practical examples, analysis tools, and documentation. Specific problems put forward beforehand by attendees will also be addressed. More information and registration through EDH is available HERE The next session, in English, will be on 24 April (afternoon). Other sessions, in French and English, will be offered following demand: the first session in French will be organised in May or June. Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch

  2. CERN Technical Training Programme: Learning for the LHC ! CLEAN-2002: Working in a Cleanroom

    CERN Multimedia

    Davide Vitè

    2002-01-01

    Exceptional session in Italian on June 13, 2002 (am). CLEAN-2002 is a new, free of charge, half-day seminar in the context of Technical Training for the LHC. The course is designed for personnel working or managing activities in an assembly cleanroom, for example physicists, engineers and technicians working at or visiting the laboratory. CLEAN-2002 is aimed at raising awareness about good working practices in a cleanroom, and at providing practical examples, analysis tools, and documentation. Specific problems put forward beforehand by attendees will also be addressed. More information and registration through EDH is available here. The next session will be held in Italian, on 13 June (morning), following a specific request. Other sessions, in French and English, will be offered following demand: the first session in French will be organised in July 2002. Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch

  3. THE TECHNICAL AND ETHNICAL DIVISION OF WORK, THE INDIGEOUS GROUPS AND THE FAMILY BUSINESSES

    Directory of Open Access Journals (Sweden)

    Gloria A. Miranda-Zambrano

    2013-04-01

    Full Text Available The work exposes some forms of indigenous groups participation on entrepreneurial family businesses, mainly in the region of Laja - Bajío where the family plays an important role in these organizations. The work point out the approach on technical ethnic division of labour to locate such actors in labour circuits, in economic activities or guilds that have been built in various social processes. To analyze the ways in which they operate, the role of the family, their knowledge (cultural capital, its forms of linkage with the community of origin and with the Group (social capital, as well as the existence of certain differences with business in common. This research is part of a larger work on family businesses.

  4. Technical know-how relevant to planning of borehole investigation for fault characterization

    Science.gov (United States)

    Mizuno, T.; Takeuchi, R.; Tsuruta, T.; Matsuoka, T.; Kunimaru, T.; Saegusa, H.

    2011-12-01

    As part of the national R&D program for geological disposal of high-level radioactive waste (HLW), the broad scientific study of the deep geological environment, JAEA has established the Mizunami Underground Research Laboratory (MIU) in Central Japan as a generic underground research laboratory (URL) facility. The MIU Project focuses on the crystalline rocks. In the case of fractured rock, a fault is one of the major discontinuity structures which control the groundwater flow conditions. It is important to estimate geological, hydrogeological, hydrochemical and rock mechanical characteristics of faults, and then to evaluate its role in the engineering design of repository and the assessment of long-term safety of HLW disposal. Therefore, investigations for fault characterization have been performed to estimate its characteristics and to evaluate existing conceptual and/or numerical models of the geological environment in the MIU project. Investigations related to faults have been conducted based on the conventional concept that a fault consists of a "fault core (FC)" characterized by distribution of the faulted rocks and a "fractured zone (FZ)" along FC. With the progress of investigations, furthermore, it is clear that there is also a case in which an "altered zone (AZ)" characterized by alteration of host rocks to clay minerals can be developed around the FC. Intensity of alteration in AZ generally decreases with distance from the FC, and AZ transits to FZ. Therefore, the investigation program focusing on properties of AZ is required for revising the existing conceptual and/or numerical models of geological environment. In this study, procedures for planning of fault characterizations have been summarized based on the technical know-how learnt through the MIU Project for the development of Knowledge Management System performed by JAEA under a contract with the Ministry of Economy, Trade and Industry as part of its R&D supporting program for developing geological

  5. South Africa's rapid electrification programme: Policy, institutional, planning, financing and technical innovations

    International Nuclear Information System (INIS)

    Bekker, Bernard; Eberhard, Anton; Gaunt, Trevor; Marquard, Andrew

    2008-01-01

    This paper documents South Africa's electrification programme from the late 1980s to the present. The primary aim of the paper is to present the reader with an overview of the policy, institutional, planning, financing and technological developments and innovations that resulted in more than 5 million households receiving access to electricity between 1990 and 2007. Key aspects include the way in which a period of political change and policy disruption were essential to the programme's initiation, and the critical role played by organisations and individuals outside of national government in helping shape new electrification policies and strategies. In addition, the paper identifies the contribution of technology development in cost reduction and achieving the social aims of the programme. Several lessons may be drawn from the institutional and planning arrangements that the South African programme has developed, the significance of the development of appropriate cost-driven technical innovations and standards, and the acknowledgement of the social function of electrification and its funding from the fiscus (rather than through cross-subsidies)

  6. Organization of work with training mathematical text for technical university students under conditions of informatization of education

    Directory of Open Access Journals (Sweden)

    Михаил Владимирович Поспелов

    2013-12-01

    Full Text Available This article describes the model of the organization of working with training mathematical text for technical university students. Need for development of training text works competencies of first-year students is proved. The impact of learning materials transition into hypertext format on training text works organizing theory is cleared. Training text works organizing stages are described.

  7. Frontex Working Arrangements: Legitimacy and Human Rights Concerns Regarding ‘Technical Relationships’

    Directory of Open Access Journals (Sweden)

    Melanie Fink

    2012-06-01

    Full Text Available Practices of extraterritorialisation have become cornerstones of the European Union member states' border control. Most of them are highly dependent on the willingness of third countries to cooperate. An increasingly important phenomenon is that cooperation is secured through relationships established by administrative authorities. This article deals with the challenges arising from the active engagement of Frontex in setting up cooperation structures.It is argued that the so-called working arrangements concluded between Frontex and the respective authorities of third countries, in their current form, show considerable deficiencies from the perspectives of the rule of law, democracy and human rights protection. They are not open to judicial review, the Parliament is not involved in their conclusion and they are not disclosed to the public. Furthermore, the human rights record of cooperating authorities is not considered. Concerns in this respect are frequently attempted to be dispelled by recourse to the 'technical' as opposed to 'political' nature of working arrangements. Likewise, it is assumed that merely 'technical relationships' cannot affect individuals. These arguments are not convincing. Quite the contrary, the political implications of working arrangements and their operation in a highly human rights sensitive field demand conformity with the fundamental values the European Union is based on.

  8. IAEA Technical Meeting on Innovative Heat Exchanger and Steam Generator Designs for Fast Reactors. Working Material

    International Nuclear Information System (INIS)

    2011-01-01

    The IAEA, within the framework of its Nuclear Energy Department’s Technical Working Group on Fast Reactors (TWG-FR), assists Member States activities in fast reactors technology development areas by providing an umbrella for information exchange [topical Technical Meetings (TMs), Workshops and large Conferences] and collaborative R&D [Coordinated Research Projects (CRPs)]. The Technical meeting on “Innovative Heat Exchanger and Steam Generator Designs for Fast Reactors” was held from 21 – 22 December 2011 in Vienna, addressing Member States’ expressed needs of information exchange in the field of advanced fast reactor design features, with particular attention to innovative heat exchangers and steam generators. The Objective of the TM is to provide a global forum for in-depth information exchange and discussion on the most advanced concepts of heat exchangers and steam generators for fast reactors. More specifically, the objectives are: · Review of the status of advanced fast reactor development activities with special emphasis on design and performance of heat exchangers and steam generators; · Discuss requirements for innovative heat exchangers and steam generators; · Present results of studies and conceptual designs for innovative heat exchangers and steam generators; · Provide recommendations for international collaboration under the IAEA aegis. The meeting agenda of the meeting is in Annex I

  9. Occupational exposure to ambient electromagnetic fields of technical operational personnel working for a mobile telephone operator

    International Nuclear Information System (INIS)

    Chauvin, S.; Gibergues, M. L.; Wuethrich, G.; Picard, D.; Desreumaux, J. P.; Bouillet, J. C.

    2009-01-01

    In order to investigate the exposure of operational personnel to radiofrequency electromagnetic fields when working for a mobile telephone operator, exposimeters were used to make individual records on 23 Technical Operations personnel (mobile telephone maintenance staff) and also on 22 Other Workers. The exposure densities, to which each of the 45 subjects was subjected, were quantified using 229 exposure indicators. Cluster analysis techniques were applied to the data, in an attempt to show that they would re-emerge as belonging to one of the two groups, i.e. the Technical Operational Personnel group or the Other Workers group. This exploratory investigation has shown that the cluster analysis does not reveal a sufficiently reliable emergence of the two groups, even though certain exposure indicators were significantly different for the two groups. In addition, the use of a Learning Group method does not lead to the discovery of a predictive law that could identify the Technical Operational Personnel as a sub-group within the overall group. (authors)

  10. Fourth Collaborative Materials Exercise of the Nuclear Forensics International Technical Working Group

    International Nuclear Information System (INIS)

    Schwantes, J.M.; Reilly, D.; Marsden, O.

    2018-01-01

    The Nuclear Forensics International Technical Working Group is a community of nuclear forensic practitioners who respond to incidents involving nuclear and other radioactive material out of regulatory control. The Group is dedicated to advancing nuclear forensic science in part through periodic participation in materials exercises. The Group completed its fourth Collaborative Materials Exercise in 2015 in which laboratories from 15 countries and one multinational organization analyzed three samples of special nuclear material in support of a mock nuclear forensic investigation. This special section of the Journal for Radioanalytical and Nuclear Chemistry is devoted to summarizing highlights from this exercise. (author)

  11. Involvement of stakeholders in the work of Technical Support Organisation: a strategy to learn together a new way of working

    International Nuclear Information System (INIS)

    Rollinger, Francois; Petitfrere, Michael

    2008-01-01

    Full text: Society's concerns have led to changes in the legal framework towards a greater requirement for public information and participation in decision-making processes. International organisations such as the OECD/NEA and the IAEA have also made similar changes. Moving towards expertise sharing is a development that demands a real change of culture on the part of all players, putting technical issues as part of a broader process of evaluation and decision-making. Which evolutions are necessary to the way Technical Support Organisations work to introduce a fourth player the population representatives in controlling radiological and nuclear risk? Developing experimental expert assessment processes involving parts of civil society that both sides can learn from one another is the core of IRSN's strategy for opening its expertise to civil society. In this perspective a dedicated team is responsible for carrying out actions in consultation with stakeholders from civil society. Two pluralistic assessment groups have been set up on radiological protection issues, and their innovative method of operation is worth highlighting. Another participative action is the development jointly with the Local Committees in the Loire Valley of methods of collecting environmental monitoring data. An internal network dedicated to stakeholder involvement has also been set up to accompany and promote this new approach internally. IRSN is currently elaborating a charter which will make public its commitments to the society related to stakeholder's involvement. Finally IRSN also intends to take advantage of existing experiences elsewhere and has been working for three years with four other assessments agencies in France in the frame of health and environmental risks about this new challenge: involving civil society in the assessments preceding the decision-making. (author)

  12. Life sciences payloads analyses and technical program planning studies. [project planning of space missions of space shuttles in aerospace medicine and space biology

    Science.gov (United States)

    1976-01-01

    Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

  13. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  14. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  15. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  16. Work ability and associated factors of Brazilian technical-administrative workers in education.

    Science.gov (United States)

    Godinho, Marluce Rodrigues; Greco, Rosangela Maria; Teixeira, Maria Teresa Bustamante; Teixeira, Liliane Reis; Guerra, Maximiliano Ribeiro; Chaoubah, Alfredo

    2016-01-02

    Studies about work ability have grown in importance owing to the worldwide aging of active populations. Research has shown that measuring work ability has a predictive value in cases of long-term sickness absence and early retirement. Our goal was to analyze the work ability and associated factors of civil servants from a higher education institution in Brazil. The participants in this cross-sectional study were 600 technical-administrative workers at a public university. Work ability was measured using the work ability index. The participants were as follows: 51.8% male; mean age of 45 years (SD = ±11); married or in a stable union (61.5%); holding a graduate degree (56.7%); having only one job (83.3%), working 40 h a week or less (78.6%); not working evenings (79.8%); and having direct contact with the public (58.3%). The prevalence of reduced work ability was 13.9%. The following factors were found to be associated with reduced work ability: age 50 years old or above (PR = 2.58; 95% CI 1.25-5.09); female (PR = 2.77; 95% CI 1.25-3.60); education up to secondary school (PR = 2.37; 95% CI 1.13-3.59); overall poor self-assessed health (PR = 2.96; 95% CI 1.32-3.93); signs and symptoms of depression (PR = 4.86; 95% CI 2.23-6.55); sedentariness (PR = 3.00; 95% CI 1.38-4.68) and poor social support at work (PR = 4.01; 95% CI 1.66-4.37). Most of the participants showed good work ability, but some subjects had reduced work ability. This study makes a contribution to expanding the discussion about the factors associated with work ability toward proposing actions for maintaining that ability or helping recovery in the case of diminished ability. Such actions can help reduce work absenteeism and early retirement, both of which have a social and economic impact in Brazil. Studying the determinants of work ability and recommendations to address those determinants will help efforts to improve the quality of life of individuals, both at work and personally, and promote healthy

  17. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... statement including identification of high priority knowledge, skill, and organization needs for rural..., which in turn support State development strategies. (3) A concise statement of the organization structure for planning and conducting the program funded under section 503(b)(2). (4) A plan for evaluating...

  18. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... relationship of this program to ongoing planning and development efforts. (3) The organizational structure for... research program techniques, and organizational structure for planning and conducting each program... separate concise statement describing specific extension projects to be funded under each program. The...

  19. 324 Building life cycle dose estimates for planned work

    International Nuclear Information System (INIS)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed

  20. 324 Building life cycle dose estimates for planned work

    Energy Technology Data Exchange (ETDEWEB)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed.

  1. JOYO MK-III modification work on heat transport system. Working plan and plant control

    International Nuclear Information System (INIS)

    Isozaki, K.; Ichige, S.; Ohshima, J.

    2002-07-01

    The MK-III project to improve the irradiation capability of the experimental fast reactor JOYO have been in underway since 1987. The increase of fast neutron flux and the enlargement of that field increase the reactor thermal rate from 100 MWt to 140 MWt. To increase cooling capacity of heat transport system, intermediate heat exchangers (IHXs), dump heat exchangers (DHXs), piping connecting to IHXs and DHXs, main motors on primary and secondary main circulation pumps were replaced. The replacement of these large components was carried out under following hard conditions. 1) Limitation of work space, 2) Fuel subassembly and molten sodium in the reactor vessel, 3) high radiation circumstances for primary cooling system, 4) treatment of radioactive sodium (radioactive sodium and corrosion product such as 60 Co, 54 Mn). There are little experiences of this kind of work in the world. Therefore the organization, working plan and safety management points were carefully examined and established, based on the previous experience of JOYO operation and maintenance, research and development results of safety treatment of sodium, experience of previous work on sodium facilities. Followings results were obtained and effectiveness was confirmed in the work. (1) Development of most suitable working plan derived from elements and full size mock up experiments, reduction of exposure time by workers training, reduction of radiation dose by installation of temporal radiation shielding were useful to reduce radiation dose. The usage of seal bag was useful to prevent the contamination spreading over. (2) The usage of seal bag, oxygen concentration monitoring in the seal bag, nitrogen concentration monitoring in the cooling system cover gas, low pressure control of cover gas were useful to reduce the inflow of oxygen to cooling system. (3) The bite cutting method for piping in air and press down cutting by roller cutter in the seal bag to prevent inflow of cutting piece, stopper

  2. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    International Nuclear Information System (INIS)

    Grabaskas, David; Bucknor, Matthew; Jerden, James; Brunett, Acacia J.

    2016-01-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  3. Systems scenarios: a tool for facilitating the socio-technical design of work systems.

    Science.gov (United States)

    Hughes, Helen P N; Clegg, Chris W; Bolton, Lucy E; Machon, Lauren C

    2017-10-01

    The socio-technical systems approach to design is well documented. Recognising the benefits of this approach, organisations are increasingly trying to work with systems, rather than their component parts. However, few tools attempt to analyse the complexity inherent in such systems, in ways that generate useful, practical outputs. In this paper, we outline the 'System Scenarios Tool' (SST), which is a novel, applied methodology that can be used by designers, end-users, consultants or researchers to help design or re-design work systems. The paper introduces the SST using examples of its application, and describes the potential benefits of its use, before reflecting on its limitations. Finally, we discuss potential opportunities for the tool, and describe sets of circumstances in which it might be used. Practitioner Summary: The paper presents a novel, applied methodological tool, named the 'Systems Scenarios Tool'. We believe this tool can be used as a point of reference by designers, end-users, consultants or researchers, to help design or re-design work systems. Included in the paper are two worked examples, demonstrating the tool's application.

  4. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  5. Connected vehicle impacts on transportation planning technical memorandum #6: skills and expertise required to incorporate connected vehicles into transportation planning.

    Science.gov (United States)

    2016-02-08

    Professional development and training are essential to the incorporation of connected/automated vehicles (C/AV) into the : transportation planning process. In order to guarantee a successful deployment, transportation planning agencies and their : st...

  6. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  7. Advocacy for International Family Planning: What Terminology Works?

    Science.gov (United States)

    Huber, Douglas; Martin, Raymond; Bormet, Mona

    Advocating for international family planning while avoiding miscommunications with politically and religiously conservative policy makers and the public requires care and clarity with language. We find that terms such as "international family planning" are well received when the meaning is clearly explained, such as "enabling couples to determine the number and timing of pregnancies, including the voluntary use of methods for preventing pregnancy - not including abortion - harmonious with their beliefs and values". Family planning also helps reduce abortions - a powerful message for conservative policy makers and the public. We concur with Dyer et al. (2016) that the messenger is important; we find that many of the most effective advocates are religious leaders and faith-based health providers from the Global South. They know and validate the importance of family planning for improving family health and reducing abortions in their communities. "Healthy timing and spacing of pregnancy" is positive language for policy makers, especially when describing the health impact for women and children. Universal access to contraceptive services is emerging as vital for family health and also to help achieve the Sustainable Development Goals (UN 2015). Language on international family planning will evolve, and clarity of meaning will be foundational for effective advocacy.

  8. The nuclear smuggling international technical working group: Making a difference in combating illicit trafficking

    International Nuclear Information System (INIS)

    Niemeyer, S.; Koch, L.

    2001-01-01

    The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in April, 1996, as part of an illicit trafficking program. The ITWG's primary goal is to develop a preferred approach to nuclear forensic investigations that is widely understood and accepted as credible. The technical elements include: 1) development of protocols for a) collection and preservation of evidence and b) for laboratory investigation; 2) prioritizing of techniques for forensic analysis; 3) development of forensic databanks to assist in interpretation; 4) executing inter-laboratory exercises; and 5) facilitating technical assistance to countries upon request. The development of protocols has been conducted jointly by law enforcement officials and laboratory scientists. A major focus during much of the past five years has been the development of a model action plan for nuclear forensics of seized nuclear materials. This action plan lays out the elements that are needed in the instance that illicit nuclear material is uncovered, e.g. incident response, crime scene analysis, collection of evidence (both radioactive and 'traditional' forensics, transportation to a nuclear facility, subsequent laboratory analysis, and then development of the case. At the most recent meeting (ITWG-6

  9. Work plan for upgrading the 241-A-701 compressed air system and motor control center. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, K.E.

    1995-01-01

    This work plan will outline the responsibilities associated with the 241-A-701 Compressed Air System (CAS) and Motor Control Center (MCC) upgrades. All activities required to design, install, test, and operate the modified systems are addressed in this document. Upgrades Technical Support (UTS) of TWRS Engineering is responsible for the completion of all tasks associated with this upgrade. UTS will coordinate the upgrade activities, and ensure all tasks are successfully completed on or before the scheduled dates. The primary objective of the 241-A-701 Compressor and MCC Upgrade is to provide a reliable source of process and instrument compressed air to the A, AX, AY, and AZ tank farms

  10. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  11. Work program analysis - defining the capability/risk plan

    International Nuclear Information System (INIS)

    Hrinivich, W.A.

    2004-01-01

    Bruce Power has developed and implemented an analysis methodology (Work Program Analysis) to assess and address corporate business risk associated with work group capability. Work Program Analysis is proving to be an excellent tool for identifying and supporting key business decisions facing the line and senior management at Bruce Power. The following describes the methodology, its application and the results achieved. (author)

  12. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  13. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  14. Does Holistic Planned Grazing™ work on native rangelands ...

    African Journals Online (AJOL)

    The balance of papers in this Special Issue show that how Holistic Planned Grazing™ is managed and where it is used impacts the efficacy of the approach. While we will do well to develop more mechanistic models that can identify these thresholds and test them in real-life situations, it is certain that broad generalisations ...

  15. WORK EXPERIENCE INTERNSHIP THROUGH THE EYES OF TECHNICAL UNIVERSITY STUDENTS (ON THE MATERIALS OF SOCIOLOGICAL RESEARCH

    Directory of Open Access Journals (Sweden)

    Alexandr Yu. Myagkov

    2015-01-01

    Full Text Available The aim of the investigation is to study the problem of efficiency of work experience internship in a technical university and its role in the education of future professionals (problem has been investigated in the framework of the research project «Monitoring of social well-being and problems of professional adaptation of ISPEU students».Methods. While carrying out of sociological research, selection of respondents was occurred on the multistage combined (serially-nested model of sample among students I, III and V courses of six faculties of full-time course of ISPEU. The complex of questions (its answers show features of professional identity of the future experts on initial (I course, intermediate (III course and finishing (V course stages of their professional formation has been developed to find out the dynamics of process of professional adaptation of students from the first to the fifth year. The information was processed with application of program and analytical complex SPSS. The comparative analysis to a gender sign of degree of satisfaction/dissatisfaction has been undertaken by the work experience internship organization on the side of high school and the accepting enterprises.Results. The level of graduates’ satisfaction with the work experience internship is revealed that works on an estimation by students of quality of preparation in high school, the relation to a received speciality and success in the future profession. The data on a self-estimation of readiness of students to work experience internship is cited. Criteria of successful work experience internship are formulated.Scientific novelty. The given researches carried out by the authors, prove that work experience internship positively influences professional consciousness of students and promote formation of steady positive installations for professional job. However, work experience internship in its institutional forms is functional and appears to be the effective

  16. Forty-Fifth Annual Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2012-01-01

    The objectives of the meeting were to: • Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); • Review the progress since the 44 th TWG-FR Annual Meeting, including the status of the actions; • Consider topical technical meeting arrangements for 2012-2013, as well as review FR-related activities included in the IAEA Programme & Budget (P&B) biennium 2012-2013; • Review the IAEA’s concluded, on-going and planned coordinated research projects in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, ESNII, etc.). The 45th Meeting of the TWG-FR reached the following conclusions/recommendations: • The participants expressed satisfaction and appreciation for the large amount of new information on on-going activities carried out by the Member States in the field of FR and ADS exchanged during the meeting; • Also the organizations which have participated to the TWG-FR meeting for the first time expressed their appreciation for the lively discussion and the results and thanked the IAEA for inviting them at the meeting; • The meeting was very useful in particular for collecting inputs and advice in view of the preparation of the IAEA Programme & Budget 2014-2015 (and then 2016-2017) in the area of FR and ADS technology development; • The TWG-FR remains an unique international forum for information exchange in the field of fast neutron systems and for promoting RT&D activities in this area; • Due to the increasing interest in FR and in view of the forthcoming realizations, it would be advisable to increase the involvement of industries, regulators and other R&D organizations; • The annual TWG-FR meeting should focused on exchange of information on national and international programmes, avoiding duplications or overlapping’s with other IAEA initiatives in the field;

  17. Important functions and development ideas of the library and information work in scientific and technical research institutes

    International Nuclear Information System (INIS)

    Ye Qingsen

    2010-01-01

    The library and information branch is an important constituent part of a scientific and technic research institute, and is a technically assistant department which is set for scientific and technic research and production. The investigations show that the achievements by the library and information departments are marked in scientific and technic research institutes, and the library and information works play important roles for the existence, development and innovation of the institute in past years. But, the present conditions and statuses are dropped behind, and more problems existed in the library and information departments as a whole. The development ideas are proposed for the library and information work by analyzing the characteristics of nowadays knowledge service, knowledge economy and network information time. (authors)

  18. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  19. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    International Nuclear Information System (INIS)

    1994-01-01

    The end of the Cold War and the decision to reduce the size of the nuclear weapons production complex have created a need for DOE to deactivate, decontaminate, and decommission (D ampersand D) a large number of aging, surplus facilities. The nature and magnitude of the facility D ampersand D problems require EM to facilitate the development and application of technologies that will address these problems quickly and cost-effectively. The needed technologies can best be provided by integrating the strengths of DOE's national laboratories with those of industry, universities, and other government agencies. To help focus and direct these activities toward achieving DOE's goals, the EM Office of Technology Development (OTD) devised the strategic concept of an Integrated Demonstration (ID), which involves selecting, demonstrating, testing, and evaluating an integrated set of technologies tailored to provide a complete solution to specific EM problems, such as those posed by D ampersand D. The ID approach allows optimal use of DOE's resources by avoiding duplication of effort and ensuring rapid demonstration of applicable technologies. Many technologies, including both the commercially mature and the innovative, are combined and evaluated for a cradle-to-grave solution to specific EM problems in areas such as D ampersand D. The process will involve transforming an existing problem condition to a desired end state, recycling waste materials generated, wherever feasible, and minimizing requirements for waste disposal. The D ampersand D ID Strategic Plan has been prepared by a Technical Support Group (TSG) assembled from various sites within the DOE Complex and intended to identify cross-cutting problem areas amenable to applications of the D ampersand D ID concept and to develop specific ID proposals for these problem areas

  20. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  1. Information system planning work on maintenance metrological equipment

    Directory of Open Access Journals (Sweden)

    Dmitry V. Shtoller

    2011-05-01

    Full Text Available Computerization has entered into all human activities. Important role in the work now is a workstation, which increases productivity. Did not remain without attention and work of the metrological services of enterprises. Electronic records can help solve many problems for the organization of data.

  2. THE INFLUENCE OF TWO MODELS OF PHYSICAL EDUCATION PLANNING ON SPORT-TECHNICAL KNOWLEDGE OF SECONDARY SCHOOL FEMALE STUDENTS

    Directory of Open Access Journals (Sweden)

    Živorad Marković

    2009-11-01

    Full Text Available The goal of this research was to determine eventual difference between continuo- us and concentrated model of planning and realization of program contents of Physical Education in relation to sport-technical knowledge of female students. This research was educational experiment with longitudinal character on the specimen of 92 fema- le examinees divided into two sub specimens - according to the criterion of realization of program contents of Physical Education lesson: experimental group with 50 female examinees and control group with 42 secondary school female examinees of year one. Sport-technical knowledge was evaluated with ten variables. Multivariant analysis of the variance, Roy’s test, discriminative analysis and descriptive analysis were applied in processing of data which were acquired by empirical research. Statistically significant differences , in favor of experimental group in all ten researched variables, indicate that the contents of experimental treatment resulted in positive effects in sport-technical knowledge of female students in experimental group.

  3. The assessment of occupational protection conditions in workplaces with high levels of exposure to natural radiation. Report from a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    2002-01-01

    Occupational exposure from natural radiation is, in the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR) 2000 Report, estimated to contribute to more than 80 percent of the world-wide annual collective dose from occupational exposure, uranium mining excluded. The Agency's Radiation Safety Standards Series, the Requirements, and the Safety Guides (jointly sponsored by the Agency and the International Labour Office), address the control of occupational exposures from natural sources of radiation. In addition, some Safety Reports on specific issues are in the process of being finalized. Following upon recommendations to the Agency from its Member States to provide further guidance on the control of occupational exposure to natural radiation, a Technical Committee Meeting on Assessment of Occupational Radiation Protection Conditions in Workplaces with High Levels of Exposure to Natural Radiation was held in Vienna from 7 to 11 May 2001. The objective of the meeting was to produce an inventory of problem areas, make an assessment of the problem and propose a draft work plan for the Agency, This IAEA Working Material includes the report from the meeting, including the presentations made. Based on the recommendations made by the Technical Committee, a work plan is being initiated, implying that more attention will be paid to occupational exposure from natural radiation sources in the Occupational Radiation Protection programme

  4. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  5. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  6. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  7. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  8. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    Science.gov (United States)

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  9. Simple Analysis of the university counsellors’ daily work and planning

    Institute of Scientific and Technical Information of China (English)

    Chen Juan

    2014-01-01

    Summary:Counsellor act as the backbone effect in students’ ideological and political work, who specialized in students’Ideological education and behavior management, and they are important component in teaching staff.

  10. The scaup conservation action plan: working toward coherence

    Science.gov (United States)

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  11. Total, technical, economic and social evaluation of a plan for defense of the vineyard according to the methodology of the "GREAT CHAIN".

    Science.gov (United States)

    Spera, G; Cargnello, G; Moretti, S; Pezza, L

    2004-01-01

    In another work, proposed in this congress, we have presented the basic methodology of the "GREAT CHAIN" in which a plan of fight to vine diseases is evaluated in the globality using 54 variables, to which a weight (in %) in a scale of priority at technical, economic, social and ethical level has been given. This basic methodology has been favourably accepted at the XIII GESCO Congress (Groupe International Systèmes De Conduite de la Vigne)--February 2003 in Montevideo (Uruguay), and at the congress on "Paysages de Vignes et de Vins" in Fonteyraud (Val de Loire) (Carbonneau, Cargnello, 2003). In this work the results of researches on the total, technical, economic, social and ethical evaluation of a conventional phytopathologic defence plan led in a vineyard of the Latium according to the method of the "GREAT CHAIN" are exposed. These researches have shown that the model of conventional phytopathologic struggle, applied in the Latium, against pests of vine positively answers for how much concerns the plants protection: the answer is good at enterprise level, but negative for all that is defence and safeguard for man and environment, in the widest sense of the term. The researches have gone on the phytopathologic defence of biological and eco-compatible vineyards with very encouraging results.

  12. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    International Nuclear Information System (INIS)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-01-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA

  13. Fire and evacuation drills make the CERN safety plans work

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    Regular drills are a way of making sure that we are ready and able to react in the event of a fire or other adverse event. They are also a demanding test of all the technical and organisational measures in place to allow the quick and safe evacuation of buildings. Recently, large-scale drills took place in Building 40 and at Point 5 underground.   Group photo at Point 5, after the common evacuation drill. The ability to react to unexpected, adverse events relies in particular on training. This is why CERN’s safety teams organise regular drills. One of the most recent exercises took place on 26 March in Building 40. “Building 40 is a modern building fully equipped against fire, with two emergency exits in the central atrium. We also have 29 emergency guides distributed on each floor to guide people out of their offices,” says Kate Richardson, Territorial Safety Officer of the building. “The drills are very useful for testing the building's insta...

  14. Technical, socio-economic, radioecological and medical aspects of works in the World during 1986-1997 which are connected with the Chernobyl accident

    International Nuclear Information System (INIS)

    Trofimenko, A.P.; Pisanko, Zh.I.; Kuprava, O.M.

    1999-01-01

    Technical, social, radioecological and medical aspects of works in the World during the years 1986-1997 in which causes and different aspects of Chernobyl accident were studied, are considered. Main directions of these works were found and the role each of them was quantitatively evaluated. A new method of INIS database analysis was used for this purpose. It permits to find subject fields of research and to give their general characteristics. An analysis of the topical content of some publications permitted to describe qualitatively their results. The obtained information can be used by the specialists who are dealing with the problems of Chernobyl accident mitigation, in finding the most important directions of work in this field, and in planning and realization of new research. 10 refs., 9 tab

  15. Standard review plan for the review and evaluation of emergency plans for research and test reactors. Technical report

    International Nuclear Information System (INIS)

    Bates, E.F.; Grimes, B.K.; Ramos, S.L.

    1982-05-01

    This document provides a Standard Review Plan for the guidance of the NRC staff to assure that complete and uniform reviews are made of research and test reactor emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in Draft II of ANSI/ANS 15.16 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix

  16. Predicting College Women's Career Plans: Instrumentality, Work, and Family

    Science.gov (United States)

    Savela, Alexandra E.; O'Brien, Karen M.

    2016-01-01

    This study examined how college women's instrumentality and expectations about combining work and family predicted early career development variables. Specifically, 177 undergraduate women completed measures of instrumentality (i.e., traits such as ambition, assertiveness, and risk taking), willingness to compromise career for family, anticipated…

  17. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  18. Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.

    Science.gov (United States)

    2015-12-01

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  19. Technical assessment of TRUSAF for compliance with work place air sampling. Revision 1

    International Nuclear Information System (INIS)

    Butler, J.D.

    1995-01-01

    The purpose of this Technical Work Document is to satisfy WHC-CM-1-6, the ''WHC Radiological Control Manual.'' This first revision of the original Supporting Document covers the period from January 1, 1994 to December 31, 1994. WHC-CM-1-6 is the primary guidance for radiological control at Westinghouse Hanford Company (WHC). As such, it complies with Title 10, Part 835 of the Code of Federal Regulations. In addition to WHC-CM-1-6, there is HSRCM-1, the ''Hanford Site Radiological Control Manual'' and several Department of Energy (DOE) Orders, national consensus standards, and reports that provide criteria, standards, and requirements for workplace air sampling programs. This document provides a summary of these, as they apply to WHC facility workplace air sampling programs. this document also provides an evaluation of the compliance of the TRUSAF workplace air sampling program to the criteria, standards, and requirements and documents. Where necessary, it also indicates changes needed to bring specific locations into compliance

  20. Forty-Second Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2009-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 41st TWG-FR Annual Meeting, including the status of the actions; - Consider topical technical meetings meeting arrangements for 2009, 2010, 2011 and beyond; - Review the IAEA’s ongoing information exchange and coordinated research activities in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives; - Discuss future joint activities in view of IAEA’s Programme and Budget Cycles beyond 2010-2011

  1. Technical Guidance for Hazardous Analysis, Emergency Planning for Extremely Hazardous Substances

    Science.gov (United States)

    This current guide supplements NRT-1 by providing technical assistance to LEPCs to assess the lethal hazards related to potential airborne releases of extremely hazardous substances (EHSs) as designated under Section 302 of Title Ill of SARA.

  2. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  3. How a submarine returns to periscope depth: analysing complex socio-technical systems using Cognitive Work Analysis.

    Science.gov (United States)

    Stanton, Neville A; Bessell, Kevin

    2014-01-01

    This paper presents the application of Cognitive Work Analysis to the description of the functions, situations, activities, decisions, strategies, and competencies of a Trafalgar class submarine when performing the function of returning to periscope depth. All five phases of Cognitive Work Analysis are presented, namely: Work Domain Analysis, Control Task Analysis, Strategies Analysis, Social Organisation and Cooperation Analysis, and Worker Competencies Analysis. Complex socio-technical systems are difficult to analyse but Cognitive Work Analysis offers an integrated way of analysing complex systems with the core of functional means-ends analysis underlying all of the other representations. The joined-up analysis offers a coherent framework for understanding how socio-technical systems work. Data were collected through observation and interviews at different sites across the UK. The resultant representations present a statement of how the work domain and current activities are configured in this complex socio-technical system. This is intended to provide a baseline, from which all future conceptions of the domain may be compared. The strength of the analysis is in the multiple representations from which the constraints acting on the work may be analysed. Future research needs to challenge the assumptions behind these constraints in order to develop new ways of working. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  4. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  5. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  6. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    Science.gov (United States)

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  7. The Test Blanket Modules project in Europe: From the strategy to the technical plan over next ten years

    International Nuclear Information System (INIS)

    Poitevin, Y.; Zmitko, M.; Orco, G. dell; Laesser, R.; Diegele, E.; Sundstroem, J.; Boccaccini, L.; Salavy, J.-F.

    2006-01-01

    The testing of Breeding Blanket concepts in ITER is recognized as an essential milestone in the development of a future reactor ensuring tritium self-sufficiency, extraction of high grade heat and electricity production. Europe is currently developing two reference breeding blankets for DEMO reactor specifications that will be tested in ITER: the Helium-Cooled Lithium-Lead (HCLL) blanket which uses the eutectic Pb-15. 7 Li as both breeder and neutron multiplier, and the Helium-Cooled Pebble-Bed (HCPB) blanket which features lithiated ceramic pebbles (Li 4 SiO 4 or Li 2 TiO 3 ) as breeder and beryllium pebbles as neutron multiplier. Both blankets are using the pressurized He technology for heat extraction (8 MPa, inlet/outlet temperature 300/500 o C) and a 9% CrWVTa Reduced Activation Ferritic Martensitic (RAFM) steel as structural material, the EUROFER. Referring to the so called '' fast-track '' EU scenario, those concepts are intended to be tested in ITER, getting the maximum of information required for launching the DEMO blanket design and construction after the first 10 years of ITER operation. For that, the EU has adopted a blanket testing strategy based on the development of Test Blanket Modules (TBMs) that are expected to use DEMO relevant technologies and are designed for each ITER plasma phase to optimize the feedback and to avoid any impact on ITER availability. Following the decision on ITER construction, the EU has reviewed and detailed the fundamental elements for an implementation of the future EU TBMs Project aimed at delivering TBMs Systems to ITER under suitable schedule and acceptance standards. For that the following items have been analyzed in detail and are reported in the present paper: · Impact of the ITER environment (design, standards, schedule, operational scheme) on the TBM systems design and development plan · Project technical plan with focus on the next ten years up to the installation of the first TBMs in ITER · Project risk

  8. The Planning of a Small Pilot Plant for Development Work on Aqueous Reprocessing of Nuclear Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Sjoeborg, T U; Haeffner, E; Hultgren, Aa

    1963-10-15

    A shielded volume (42 m{sup 3}) in the hot laboratory at Kjeller, Norway, has been used for the installation of a small pilot plant intended for studies on nuclear fuel reprocessing. During the first period of operation (1963) a plutonium separation method (the Silex process) developed at AB Atomenergi will be studied. This document is a description of the project during the stage of technical planning and chemical process development.

  9. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    Science.gov (United States)

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  10. The concurrent validity of the technical test battery as an indicator of work performance in a telecommunications company

    Directory of Open Access Journals (Sweden)

    Marelize Barnard

    2005-10-01

    Full Text Available The purpose of this study was to assess the concurrent validity of the Technical Test Battery (TTB in a South African telecommunications institution. The Technical Test Battery (TTB was administered to a sample of 107 technical officers. Their test scores were compared to the scores obtained from a job performance rating scale specifically designed for this position on the basis of a thorough job analysis. The TTB demonstrated high concurrent validity as an indicator of work performance for technical posts in the telecommunications environment. These results suggest that the TTB may have a high predictive validity for performance in technical positions. The findings and implications of the study are discussed. Opsomming Die doel van hierdie studie was om die samevallende geldigheid van die “Technical Test Battery (TTB�? in ’n Suid-Afrikaanse telekommunikasie instansie te bepaal. Die TTB is op ’n steekproef van 107 tegniese personeel toegepas. Die toetstellings is in verband gebring met die tellings van ’n werksprestasiemaatstaf wat spesifiek vir die pos ontwikkel is op grond van ’n deeglike posanalise. Daar is bevind dat die TTB ’n hoë samevallende geldigheid as aanduider van werksprestasie vir tegniese poste in the telekommunikasiebedryf toon. Dié resultate dui op ’n sterk moontlikheid dat die TTB ’n goeie voorspeller van werksprestasie vir tegniese beroepe kan wees. Die bevindinge en implikasies van die studie word bespreek.

  11. Causal Effects of Career-Technical Education on Postsecondary Work Outcomes of Individuals with High-Incidence Disabilities

    Science.gov (United States)

    Lee, Heok In; Rojewski, Jay W.; Gregg, Noel

    2016-01-01

    Using data from the National Longitudinal Transition Study-2, a propensity score analysis revealed significant causal effects for a secondary career and technical education (CTE) concentration on the postsecondary work outcomes of adolescents with high-incidence disabilities. High school students identified as CTE concentrators (three or more high…

  12. Mixed Methods in Education Research. IES Technical Working Group Meeting. Meeting Summary (Washington, DC, May 29, 2015)

    Science.gov (United States)

    Institute of Education Sciences, 2015

    2015-01-01

    This meeting summary is organized into two major sections. The first section captures the individual contribution of meeting participants, including both Institute of Education Sciences (IES) staff and the invited technical working group members. The second section captures themes that arose during the group discussions, which were organized…

  13. Analysis of Work Performance of Family Planning Field Workers in Male Family Planning Program in Cilacap District

    OpenAIRE

    Suryani, Untari Fajar; Nurjazuli, Nurjazuli; Arso, Septo Pawelas

    2013-01-01

    Target of MDG's to reach maternal mortality rate of 102/100.000 live-births and infantmortality rate of 23/1000 live-births had been performed by improving maternal health throughincreasing contraceptive prevalence rate and decreasing unmet need. Percentage of male withpermanent birth control in Cilacap district was in the lowest rank, 0.16%. Success of familyplanning program could not be separated from work performance of PLKB (family planning field workers); assessment of PLKB work performa...

  14. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume II. Detailed technical plan. Revision 2

    International Nuclear Information System (INIS)

    1982-08-01

    The four sections which comprise Part II describe in detail the technical basis for each of the four Program Elements (PE's) of the FWBS Engineering Technology Program (ETP). Each PE is planned to be executed in a number of phases. The purpose of the DTP's is to delineate detailed near-term research, development, and testing required to establish a FWBS engineering data base. Optimum testing strategies and construction of test facilities where needed are identified. The DTP's are based on guidelines given by Argonne National Laboratory which included the basic programmatic goals and the requirements for the types of tests and test conditions

  15. Emergency-control planning in the vicinity of large-scale technical plants

    International Nuclear Information System (INIS)

    Lindackers, K.H.

    1982-01-01

    In 7 theses, the author shows the most important aspects of disaster control planning: 1) The planning of disaster control measures should not be the object of a licencing procedure. 2) On site allocation or planned determination of sites for potentially hazardous plants it shall be examined whether disaster control measures can be performed sufficiently. 3) Planning of disaster control measures must not be based on detailed accident scenarios. 4) It should be limited to a few day's duration after the accident has occurred. 5) Special attention should be dedicated to the problems of - information and communications, - decision-taking procedures and translation of decicions into action, - practical realization of measures. 6) The bodies charged with planning and implementation must have appropriate personnel and material. 7) Only adequate exercises can guarantee planned disaster control measures to engage under conditions of severity. (HSCH) [de

  16. Light Water Reactor Sustainability Program Reactor Safety Technologies Pathway Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Corradini, M. L. [Univ. of Wisconsin, Madison, WI (United States); Peko, D. [US Dept. of Energy, Washington, DC (United States); Farmer, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Rempe, J. [Rempe and Associates LLC, Idaho Falls, ID (United States); Humrickhouse, P. [Idaho National Lab. (INL), Idaho Falls, ID (United States); O' Brien, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Robb, K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gauntt, R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Osborn, D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    In the aftermath of the March 2011 multi-unit accident at the Fukushima Daiichi nuclear power plant (Fukushima), the nuclear community has been reassessing certain safety assumptions about nuclear reactor plant design, operations and emergency actions, particularly with respect to extreme events that might occur and that are beyond each plant’s current design basis. Because of our significant domestic investment in nuclear reactor technology (99 operating reactors in the fleet of commercial LWRs with five under construction), the United States has been a major leader internationally in these activities. The U.S. nuclear industry is voluntarily pursuing a number of additional safety initiatives. The NRC continues to evaluate and, where deemed appropriate, establish new requirements for ensuring adequate protection of public health and safety in the occurrence of low probability events at nuclear plants; (e.g., mitigation strategies for beyond design basis events initiated by external events like seismic or flooding initiators). The DOE has also played a major role in the U.S. response to the Fukushima accident. Initially, DOE worked with the Japanese and the international community to help develop a more complete understanding of the Fukushima accident progression and its consequences, and to respond to various safety concerns emerging from uncertainties about the nature of and the effects from the accident. DOE R&D activities are focused on providing scientific and technical insights, data, analyses methods that ultimately support industry efforts to enhance safety. These activities are expected to further enhance the safety performance of currently operating U.S. nuclear power plants as well as better characterize the safety performance of future U.S. plants. In pursuing this area of R&D, DOE recognizes that the commercial nuclear industry is ultimately responsible for the safe operation of licensed nuclear facilities. As such, industry is considered the primary

  17. Light Water Reactor Sustainability Program: Reactor Safety Technologies Pathway Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Corradini, M. L. [Univ. of Wisconsin, Madison, WI (United States)

    2015-06-01

    In the aftermath of the March 2011 multi-unit accident at the Fukushima Daiichi nuclear power plant (Fukushima), the nuclear community has been reassessing certain safety assumptions about nuclear reactor plant design, operations and emergency actions, particularly with respect to extreme events that might occur and that are beyond each plant’s current design basis. Because of our significant domestic investment in nuclear reactor technology (99 operating reactors in the fleet of commercial LWRs with five under construction), the United States has been a major leader internationally in these activities. The U.S. nuclear industry is voluntarily pursuing a number of additional safety initiatives. The NRC continues to evaluate and, where deemed appropriate, establish new requirements for ensuring adequate protection of public health and safety in the occurrence of low probability events at nuclear plants; (e.g., mitigation strategies for beyond design basis events initiated by external events like seismic or flooding initiators). The DOE has also played a major role in the U.S. response to the Fukushima accident. Initially, DOE worked with the Japanese and the international community to help develop a more complete understanding of the Fukushima accident progression and its consequences, and to respond to various safety concerns emerging from uncertainties about the nature of and the effects from the accident. DOE R&D activities are focused on providing scientific and technical insights, data, analyses methods that ultimately support industry efforts to enhance safety. These activities are expected to further enhance the safety performance of currently operating U.S. nuclear power plants as well as better characterize the safety performance of future U.S. plants. In pursuing this area of R&D, DOE recognizes that the commercial nuclear industry is ultimately responsible for the safe operation of licensed nuclear facilities. As such, industry is considered the primary

  18. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  19. Report on generation IV technical working group 3 : liquid metal reactors

    International Nuclear Information System (INIS)

    Lineberry, M. J.; Rosen, S. L.; Sagayama, Y.

    2002-01-01

    This paper reports on the first round of R and D roadmap activities of the Generation IV (Gen IV) Technical Working Group (TWG) 3, on liquid metal-cooled reactors. Liquid metal coolants give rise to fast spectrum systems, and thus the reactor systems considered in this TWG are all fast reactors. Gas-cooled fast reactors are considered in the context of TWG 2. As is noted in other Gen IV papers, this first round activity is termed ''screening for potential'', and includes collecting the most complete set of liquid metal reactor/fuel cycle system concepts possible and evaluating the concepts against the Gen IV principles and goals. Those concepts or concept groups that meet the Gen IV principles and which are deemed to have reasonable potential to meet the Gen IV goals will pass to the next round of evaluation. Although we sometimes use the terms ''reactor'' or ''reactor system'' by themselves, the scope of the investigation by TWG 3 includes not only the reactor systems, but very importantly the closed fuel recycle system inevitably required by fast reactors. The response to the DOE Request for Information (RFI) on liquid metal reactor/fuel cycle systems from principal investigators, laboratories, corporations, and other institutions, was robust and gratifying. Thirty three liquid metal concept descriptions, from eight different countries, were ultimately received. The variation in the scope, depth, and completeness of the responses created a significant challenge for the group, but the TWG made a very significant effort not to screen out concepts early in the process

  20. Forty-Fourth Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2011-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 43rd TWG-FR Annual Meeting, including the status of the actions; - Consider topical technical meeting arrangements for 2012-2013, as well as review FR-related activities included in the IAEA Project&Budget (P&B) biennium 2012-2013; - Review the IAEA’s ongoing information exchange and coordinated research projects in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, ESNII, etc.)

  1. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    International Nuclear Information System (INIS)

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts

  2. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  3. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO)

  4. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  5. Reality and Analysis: Personal and Technical Reflections on the Working Lives of Six Women.

    OpenAIRE

    Chen, M.; Jhabvala, R.; Kanbur, R.; Mirani, N.; Osner, Karl (Eds) WIEGO

    2004-01-01

    A group of development analysts had a dialogue about labor market, trade and poverty issues in 2004. They preceded the dialogue with exposure to the realities of the lives of six remarkable women from the Self-Employed Women's Association (SEWA) in Gujarat, India. The struggles faced by the authors provided the frame for the technical dialogue that followed. This is a Compendium of personal and technical reflections of the analysts involved in the exercise.

  6. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    Science.gov (United States)

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  7. Technical progress, the concept of individualized cancer treatment and the innovation of computer-assisted radiotherapy planning

    International Nuclear Information System (INIS)

    Merkle, K.; Tanneberger, S.; Matschke, S.

    1985-01-01

    After a first step of cancerogenesis, the further development of the tumor is an individual process. At the end of this process the tumor is formed as an individual in the individual. The individuality of cancer exists on the level of organs, tissues and cells and includes an individual tumor-host relationship. Today, optimized cancer treatment requires a most precise biological characterization possible of the tumor and of the tumor-host relationship, which will provide objective information about the individual character of every tumor. Routine analysis and strict therapeutic consideration of the clinical and biological individuality of human cancer can offer real chances for the improvement of cancer treatment. A routine acquisition of individual tumor characteristics will be possible only if methods and equipment are available for the registration of suitable parameters. In this context technical innovations have an essential influence on the realization of the concept of individualized cancer treatment. With the method of flow cytophotometry and other techniques examples are given in how far the ideas of individual cancer management can be realized by introduction of new technical solutions into medical research and clinical practice. Unfortunately there is still a lack of methodology in individualizing cancer treatment. The individualization of radiotherapy is connected to an extremely high degree of technical innovations. Particularly this refers to the topometrical description of the target volume in relation to the adjacent anatomical structures and the body contour as well as the fitting of isodoses to the shape and size of the target volume. As an example of innovation of a technical solution for individual radiotherapy planning the computer-assisted radiotherapy planning system DOPSY is described. (author)

  8. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  9. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    National Research Council Canada - National Science Library

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  10. Progress in improving provincial plans for nutrition through targeted technical assistance and local advocacy in Vietnam.

    Science.gov (United States)

    Harris, Jody; Nguyen, Phuong H; To, Quyen; Frongillo, Edward A; Menon, Purnima

    2016-12-01

    Vietnam has been decentralizing nutrition planning to provinces, which could help with local relevance and accountability. Assessment in 2009 found a continuing top-down approach, limited human capacity, and difficulty in integrating multiple sectors. Alive and Thrive (A&T) provided targeted assistance and capacity-building for 15 provincial plans for nutrition (PPNs). We aimed to (i) assess PPN content and quality improvements 2009-2014, and (ii) explain processes through which change occurred. Data consisted of interview-based assessments of provincial planning processes, annual PPN assessments, and tracking of A&T involvement. At endline, some provinces produced higher quality plans. Local planning skills improved, but capacity remained insufficient. Awareness of and support for nutrition improved, but some policy and legal environments were contradictory. Objectives were clearer, but use of data for planning remained inconsistent. Provinces became more proactive and creative, but remained constrained by slow approval processes and insufficient funding. Targeted assistance and local advocacy can improve decentralized planning, with success dependent on policy and programming contexts and ability to overcome constraints around capacity, investment, data use and remnants of centralized planning. We recommend strong engagement with planners at the national level to understand how to unblock major constraints; solutions must take into consideration the particular political, financial and administrative context. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  11. A Modernization Plan for the Technical Data Department of the Naval Ships Weapon Systems Engineering Station

    Science.gov (United States)

    1976-09-01

    intergration plan showing the relationship of all phases to the end objective. 17 c. A timing plan to coordinate milestones within each phase as they...per system, horizontally rotated between two read/record units contained in the laser recorder unit. Each read/record unit is independent, which

  12. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    Energy Technology Data Exchange (ETDEWEB)

    French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [URS Coporation

    2012-06-26

    Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts have

  13. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    International Nuclear Information System (INIS)

    French, Sean B.; Shuman, Rob

    2012-01-01

    Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D and D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts

  14. Technical Note: Improving the VMERGE treatment planning algorithm for rotational radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Gaddy, Melissa R., E-mail: mrgaddy@ncsu.edu; Papp, Dávid, E-mail: dpapp@ncsu.edu [Department of Mathematics, North Carolina State University, Raleigh, North Carolina 27695-8205 (United States)

    2016-07-15

    Purpose: The authors revisit the VMERGE treatment planning algorithm by Craft et al. [“Multicriteria VMAT optimization,” Med. Phys. 39, 686–696 (2012)] for arc therapy planning and propose two changes to the method that are aimed at improving the achieved trade-off between treatment time and plan quality at little additional planning time cost, while retaining other desirable properties of the original algorithm. Methods: The original VMERGE algorithm first computes an “ideal,” high quality but also highly time consuming treatment plan that irradiates the patient from all possible angles in a fine angular grid with a highly modulated beam and then makes this plan deliverable within practical treatment time by an iterative fluence map merging and sequencing algorithm. We propose two changes to this method. First, we regularize the ideal plan obtained in the first step by adding an explicit constraint on treatment time. Second, we propose a different merging criterion that comprises of identifying and merging adjacent maps whose merging results in the least degradation of radiation dose. Results: The effect of both suggested modifications is evaluated individually and jointly on clinical prostate and paraspinal cases. Details of the two cases are reported. Conclusions: In the authors’ computational study they found that both proposed modifications, especially the regularization, yield noticeably improved treatment plans for the same treatment times than what can be obtained using the original VMERGE method. The resulting plans match the quality of 20-beam step-and-shoot IMRT plans with a delivery time of approximately 2 min.

  15. Use Of ProductionService Work In Enhancing Skill Acquisition In Technical Colleges In North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Peter Ashlame Agu

    2015-08-01

    Full Text Available Skill acquisition is a critical component of any vocational or technical training program. When this component is missing or falls below expectation it tends to defeat the objectives or the essence of the program. In Nigeria many skill acquisition institutions experience great challenges in trying to provide the necessary facilities required for effective vocational training of those enrolled in their programs because of paucity of funds. The result is that students graduate from the programs without adequate employability skills for meaningful productiveservice work after leaving school. In realization of this shortfall government has directed technical colleges to establish what is called ProductionService Work PSW into its curriculum. This is with the view that in the event that there is shortfall in the supply of training facilities by sponsors of the programs jobs could be brought in from inside or outside the school which could provide opportunity for students to acquire hands-on experience that would equip them with requisite skills for post-graduation work. As laudable as this initiative appears to be many schools in the North Central Nigeria are yet to implement the directive of the federal government in their schools and even where this has been done its implementation does not appear to be viable. Over the years different technical colleges have adopted different approaches toward the establishment and management of productionservice work in their schools. While some have recorded appreciable success in its implementation others seem to exist only in name. The present study therefore sought to identify the current practices employed in the use of PSW in technical colleges the appropriateness of the practices in use and the alternative practices that could be adopted to improve and guide the implementation of the program with a view to enhancing the acquisition of employability skills in technical colleges in North Central Nigeria.

  16. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  17. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  18. Will a Quota Plan for Asylum Seekers Plan Work —and Why Not?

    DEFF Research Database (Denmark)

    Seeberg, Peter

    2015-01-01

    The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute...... later on lead to a common EU migra-tion policy, which are beyond national control and would make it difficult to avoid responsibilities for internal crisis situations emerging in other parts of the Middle East or North Africa in the future....

  19. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan

    Directory of Open Access Journals (Sweden)

    Christoph Gutenbrunner

    2018-01-01

    Full Text Available Objective: A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. Methods: The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. Results and discussion: The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  20. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan.

    Science.gov (United States)

    Gutenbrunner, Christoph; Nugraha, Boya

    2018-04-18

    A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP) for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  1. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  2. Meeting of the Technical Working Group on Fast Reactors (TWG-FR) (41st Annual Meeting). Working Material

    International Nuclear Information System (INIS)

    2008-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 40th TWG-FR Annual Meeting, including the status of the actions; - Consider meeting arrangements for 2008, 2009, 2010 and beyond; - Review the IAEA’s ongoing information exchange and coordinated research activities in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives; - Discuss future joint activities in view of IAEA’s Programme and Budget Cycles beyond 2008-2009

  3. RFI/RI work plan for the Road A Chemical Basin 904-111G

    International Nuclear Information System (INIS)

    Kmetz, T.F.

    2000-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities

  4. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  5. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  6. An investigation on technical bases of emergency plan zone determination of Qinshan Nuclear Power Base

    International Nuclear Information System (INIS)

    Duan Xuyi

    2000-01-01

    According to the general principal and the basic method of determination of emergency zone and safety criteria and in the light of the environmental and accidental release characteristic of Qinshan Nuclear Power Base, the expectation dose of assumed accident of each plant was compared and analyzed. In consideration of the impact factor of the size of emergency plan zone and referring to the information of emergency plan zone determination of other country in the world, the suggestions of determination method of emergency plan zone are proposed

  7. Forty-Fifth Annual Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Presentations

    International Nuclear Information System (INIS)

    2012-01-01

    The objectives of the meeting were to: • Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); • Review the progress since the 44 th TWG-FR Annual Meeting, including the status of the actions; • Consider topical technical meeting arrangements for 2012-2013, as well as review FR-related activities included in the IAEA Programme & Budget (P&B) biennium 2012-2013; • Review the IAEA’s concluded, on-going and planned coordinated research projects in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, ESNII, etc.)

  8. In situ leach uranium mining. Proceedings of a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    2002-03-01

    At the beginning of 1996 there were 437 nuclear power plants in operation with a combined electricity generating capacity of 344 GWe (net gigawatts electric). This represents nearly a 100% increase over the last decade. In 1995 over 2228 TWh (terawatt hours) electricity were generated, equivalent to about 17% of the world's total electricity. To achieve this, about 61 400 tonnes U were required as nuclear fuel. The 15 year decline of the spot uranium price, as indicated by Nuexco Exchange Value (NEV) and other indices, which reached an all time low annual average in 1994 of $18.33/kg U ($7.05/pound U 3 O 8 ), has had a profound impact on uranium related activities. This led to the massive reduction and realignment of all uranium related activities as the worldwide uranium market adjusted from over-production. Because of the economic advantages of properly run in situ leach technology on carefully selected uranium orebodies, relatively more ISL mining facilities have been kept in operation than conventional mining operations. In 1995 world uranium production of about 34 000 t uranium met only about 55% of world requirements. An estimated 16% of production came from ISL mining. In 1996 ISL mining was estimated to have produced over 5600 tU, or over 15% of estimated world production of 36 400 tU. The importance of ISL mining is expected to increase, as the technology has economic and environmental advantages for producing uranium from carefully selected deposits when projects are properly designed and operated by experienced personnel. Several countries host sandstone type uranium deposits, the only type where commercial ISL projects have been developed. ISL uranium mining technology was developed independently in the USA and the former Soviet Union and associated non-WOCA (world outside centrally planned economic areas) countries starting in the 1960s and 1970s. Since the opening of relations between the two areas in the early 1990s there has been a high level of

  9. Development of a statewide motorcycle safety plan for Texas : technical report.

    Science.gov (United States)

    2013-02-01

    The objective of this research project was to develop a statewide plan to reduce motorcycle crashes and : injuries in the state of Texas. The project included a review of published literature on current and proposed : countermeasures for reducing the...

  10. Master plan for remediation of the Sillamaee tailings pond and technical design project

    International Nuclear Information System (INIS)

    Kaasik, T.

    2000-01-01

    Remediation of the Sillamaee radioactive tailings pond is a priority in the Estonian National Environmental Plan. The Sillamaee plant has processed metal ores by hydrometallurgical methods since 1946. Processing continued until 1990, but in the 1970s, production of rare earths and rare metals was introduced and continues today at a smaller scale. The tailings pond contains residues from these operations. The environmental problems associated with the tailings pond are the stability of the dam and the release of contaminants. In order to deal with these two issues effectively, a master plan was drawn up. The master plan covers the period from 1997 to 2008 and was compiled with the cooperation of the Silmet Group and the Sillamaee International Expert Reference Group (SIERG). The master plan sets up a systematic approach for the overall tailings pond remediation, including drying its interior, reshaping and covering the surface, minimizing water flow through the tailings, and ensuring long-term dam stability

  11. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  12. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    Science.gov (United States)

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  13. Experts' perspective on the performance of Chinese technical guidelines for Plan Environmental Impact Assessment

    International Nuclear Information System (INIS)

    He Jia; Sun Sun; Bao Cunkuan; Chen Fan; Jiang Dahe

    2011-01-01

    This research was to evaluate the Technical Guideline (HJ/T130-2003) effectiveness based on data resource from a questionnaire survey and interviews on EIA experts. The result demonstrated that the guideline served mainly as a quality control measure for PEIA products, and only a small proportion of experts considered it effective due to its inconsistency with the newly released Chinese PEIA Regulation (2009) and poor practicability. Current status of SEA implementation in China was also studied in terms of application fields, effectiveness evaluation, and major issues to affect SEA, to conclude that SEA implementation in China is premature, and with limited effectiveness. The major problem was the lack of effective methodologies and technical tools. Recommendations for revising the PEIA Guideline and advices to improving SEA implementation in China were accordingly proposed.

  14. Instrumentation and Controls Division, Technical Support Department Management Plan, FY 1993--FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Kunselman, C.W.; Effler, R.P.; Miller, D.R.; Millet, A.J.; Stansberry, C.T.

    1993-08-01

    This report describes the organization, key functions, and major activities of the Technical Support Department The Department is the programmatic support element of the Instrumentation and Controls Division. The Department`s primary focus is the support of existing equipment and systems at Oak Ridge National Laboratory that are generally characterized as instrumentation and controls. The support takes the form of repair, calibration, fabrication, field engineering, preventive maintenance, software support, and record keeping.

  15. Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

    National Research Council Canada - National Science Library

    1997-01-01

    This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...

  16. A Study on Establishment of Nuclear Power Plant Technical Support System and Activation Plan

    International Nuclear Information System (INIS)

    Wi, M. H.; Park, W. S.; Lee, H. S.; Kim, J. H.; Won, B. C.; Kim, Y. H.; Goo, D. S.; Choi, H. B.

    2009-11-01

    This report includes activities related to establishment of 'BaroBaro nuclear plant technical support center', 'selection of nuclear plant applicable technology', and 'various information interchange between KAERI and nuclear power plant'. 'BaraBaro center was newly organized to support on resolving the technical difficulties in operation of nuclear power plant'. The center consists of 10 technical parts and a leading expert is assigned to each part to support more efficiently. This center is always served for 24 hour. The plant operators can register their problem to the center by a call, e-mail, or internet and they can receive the answer about what they issued from KAERI experts. To make a brochure, we selected 32 technologies which are applicable in nuclear plant without additional R and D activity. The brochure was distributed to the officer in charge of nuclear plant operations. Various meetings were held to increase interchange of experience and technology between KAERI and nuclear power plant and we discussed many different issues at that meeting

  17. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  18. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  19. Physico-technical irradiation planning for the therapy of oesophagus carcinomas by means of computed whole-body tomography

    International Nuclear Information System (INIS)

    Ammon, J.; Greiner, K.; Kaesberg, P.

    1980-01-01

    It is particularly difficult to establish a physico-technical irradiation plan for the thoracic part of an oesophagus carcinoma. This is due to the considerable modifications of the thoracic cross-section within the longitudinal axis of the radiation field. Therefore, tomographic cross-sections were made of the upper, the middle and the lower plane of the radiation field. The percentage dose distributions could be determined with a process computer (system TPS, Philips) for different irradiation techniques and irradiation equipments. Examinations of 21 patients showed that the best dose distribution, i.e. a distribution which spares the lung and spinal marrow regions adjacent to the target volume, is obtained by an excentric moving field therapy. Furthermore, localisation and dimensions of inhomogeneities are indicated by computer tomography which makes possible to take into consideration these inhomogeneities when calculating the dose. It was found that the irradiation times can so be reduced by more than 20%. We are therefore of the opinion that it is necessary to establish individual cross-sections of the body by computed tomography when elaborating a physico-technical irradiation plan for the treatment of an oesophagus carcinoma. (orig.) [de

  20. Teaching Technical Writing and Editing -- In-House Programs That Work. Anthology Series No. 5.

    Science.gov (United States)

    Shaw, James G., Ed.

    The 12 articles in this publication provide indepth treatment of important aspects of in-house training programs for technical writing and editing. The articles deal with the following topics: the value of an in-house writing course, teaching in industry, developing an in-house writing course for engineers and scientists, a new approach to…

  1. Applicability of Socio-Technical Model (STM in Working System of Modern Organizations

    Directory of Open Access Journals (Sweden)

    Rosmaini Tasmin

    2011-10-01

    Full Text Available Knowledge has been identified as one of the most important resources in organization that contributes to competitive advantages. Organizations around the world realize and put into practice an approach that bases on technological and sociological aspects to fill-up the gaps in their workplaces. The Socio-Technical Model (STM is an established organizational model introduced by Trist since 1960s at Tavistock Institute, London. It relates two most common components exist in all organizations, namely social systems (human and technological systems (information technology, machinery and equipment in organizations over many decades. This paper reviews the socio-technical model from various perspectives of its developmental stages and ideas written by researchers. Therefore, several literature reviews on socio-technical model have been compiled and discussed to justify whether its basic argument matches with required practices in Techno-Social environments. Through a socio-technical perspective on Knowledge Management, this paper highlights the interplay between social systems and technological system. It also suggests that management and leadership play critical roles in establishing the techno-social perspective for the effective assimilation of Knowledge Management practices.

  2. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  3. Role of working memory components in planning performance of individuals with Parkinson's disease

    NARCIS (Netherlands)

    Altgassen, A.M.; Phillips, L.H.; Kopp, U.; Kliegel, M.

    2007-01-01

    The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417–423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD).

  4. Employees' intentions to retire early : a case of planned behavior and anticipated work conditions

    NARCIS (Netherlands)

    van Dam, Karen; van der Vorst, Janine D.M.; van der Heijden, Beatrice

    2009-01-01

    This study investigated the early retirement intentions of 346 older Dutch employees by extending the theory of planned behavior with anticipated work conditions. The results showed that employees who felt a pressure from their spouse to retire early had a strong intention to leave the work force

  5. Understanding work-related social media use: An extension of theory of planned behavior.

    NARCIS (Netherlands)

    van Zoonen, W.; Verhoeven, J.W.M.; Elving, W.J.L.

    2014-01-01

    This study examines the motives of employees to engage in work related social media use - i.e. the use of personal social media accounts to communicate about work-related issues. The theory of planned behavior (TPB) was used to explain this behavior. Because social media can enable users to express

  6. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  7. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  8. Technical and economic evaluation of voltage level in transmission network expansion planning using GA

    International Nuclear Information System (INIS)

    Jalilzadeh, S.; Kazemi, A.; Shayeghi, H.; Madavi, M.

    2008-01-01

    Transmission network expansion planning is an important part of power system planning. Its task is to determine an optimal network configuration according to load growth. It determines where, when and how many new transmission lines should be installed. Up to now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem, but in all of these methods, the STNEP problem has been solved regardless of voltage level of the lines. In this paper, due to different voltage levels in the transmission network, which cause different annual losses, STNEP has been studied considering the voltage level of the transmission lines and the network loss using the genetic algorithm (GA). Finally, the proposed idea has been examined on Garvers 6 bus network. The results show that considering the loss in a network with different voltage levels decreases the operational costs considerably, and the network satisfies the requirement of delivering electric power more safely and reliably to load centers

  9. Establishing a scientific and technical information program: Planning and resource management

    Science.gov (United States)

    Blados, Walter R.

    1992-01-01

    In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.

  10. Planning for Student Assessment: Participant's Handbook. Bilingual Evaluation Technical Assistance, Workshop III.

    Science.gov (United States)

    California Univ., Los Angeles. Center for the Study of Evaluation.

    This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…

  11. Achieving focused infrastructure investment in South Africa: Technical advances in provincial spatial planning

    CSIR Research Space (South Africa)

    Meiklejohn, C

    2008-11-01

    Full Text Available for The Presidency, and in making a contribution towards addressing some of the weaknesses of provincial-level spatial planning identified in this assessment. The specific focus is on specialist services (spatial analysis and policy advice) undertaken by CSIR Built...

  12. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    Science.gov (United States)

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  13. Technical Meeting on Fast Reactors and Related Fuel Cycle Facilities with Improved Economic Characteristics. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The objectives of the meeting were: - To identify the main issues and technical features that affect capital and energy production costs of fast reactors and related fuel cycle facilities; - To present fast reactor concepts and designs with enhanced economic characteristics, as well as innovative technical solutions (components, subsystems, etc.) that have the potential to reduce the capital costs of fast reactors and related fuel cycle facilities; - To present energy models and advanced tools for the cost assessment of innovative fast reactors and associated nuclear fuel cycles; - To discuss the results of studies and on-going R&D activities that address cost reduction and the future economic competitiveness of fast reactors; and - To identify research and technology development needs in the field, also in view of new IAEA initiatives to help and support Member States in improving the economic competitiveness of fast reactors and associated nuclear fuel cycles

  14. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    Hundreds of aging nuclear materials processing facilities within the Department of Energy`s (DOE) Weapons Complex are now being shut down and deactivated. These facilities, situated throughout the United States, will require a monumental effort to clean up safely and with minimal environmental insult. Current cleanup technologies tend to be labor intensive and expensive, they produce an unacceptably large volume of waste, and they expose workers to radioactive and other hazardous substances. This document describes an emerging program designed to develop and demonstrate new technical approaches to the decontamination and decommissioning (D&D) program for DOE`s nuclear materials processing facilities. Sponsored by the DOE Office of Technology Development within the Office of Environmental Restoration and Waste Management (EM), the program seeks to integrate the strengths of DOE`s technical, managerial, and systems engineering capabilities with those of industry, universities, and other government agencies. Once developed, these technologies will help to provide US industry with a competitive edge in the worldwide market that exists for improved environmental restoration and D&D services.

  15. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    International Nuclear Information System (INIS)

    1994-01-01

    Hundreds of aging nuclear materials processing facilities within the Department of Energy's (DOE) Weapons Complex are now being shut down and deactivated. These facilities, situated throughout the United States, will require a monumental effort to clean up safely and with minimal environmental insult. Current cleanup technologies tend to be labor intensive and expensive, they produce an unacceptably large volume of waste, and they expose workers to radioactive and other hazardous substances. This document describes an emerging program designed to develop and demonstrate new technical approaches to the decontamination and decommissioning (D ampersand D) program for DOE's nuclear materials processing facilities. Sponsored by the DOE Office of Technology Development within the Office of Environmental Restoration and Waste Management (EM), the program seeks to integrate the strengths of DOE's technical, managerial, and systems engineering capabilities with those of industry, universities, and other government agencies. Once developed, these technologies will help to provide US industry with a competitive edge in the worldwide market that exists for improved environmental restoration and D ampersand D services

  16. Technical Meeting on the Implementation of Fast Reactor Data Retrieval and Knowledge Preservation Activities. Working Material

    International Nuclear Information System (INIS)

    2008-01-01

    The current Technical Meeting was convened to foster the development of the FRKP initiative, in general, and, more specifically, to advance the development of the FRKP Portal. Its objectives were therefore: 1. To review the implementation status of the FRKP Portal prototype; 2. To review the availability of FR-related document collections made accessible through the FRKP Portal; 3. To locate sources of FR-related digital items to be made accessible through the FRKP portal

  17. Technical meeting on decommissioning of fast reactors after sodium draining. Working material

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of the technical meeting was to provide a forum for in-depth scientific and technical exchange on topics related to the decommissioning experience with fast reactors, in particular with regard to the decommissioning of components after sodium draining. Accordingly, the scope of the meeting covers the review and analyses of the experience gained from the decommissioning of both active sodium loops and sodium cooled fast reactors (e.g., KNK II, Superphenix, RAPSODIE, EBR-II, FERMI, BN-350, BR-10). It is expected that the outcome of the meeting will contribute to the Agency initiative to preserve fast reactor data and knowledge. The main focus of the technical meeting was given on the decommissioning of both active loop and reactor components (e.g., the primary vessel of a sodium-cooled reactor) that have been drained of sodium, but that still conserve some residual amounts of sodium (e.g., films covering the entire surface of the component, or particular sodium heels that cannot be drained)

  18. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  19. Use of probabilistic safety assessment in the regulatory process. Report of the technical committee meeting. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    A Technical Committee Meeting (TCM) was organized between 5-8 December 1994 to discuss and review the international situation in connection with the use made, whether formally or informally, by regulatory bodies of probabilistic safety assessment (PSA) in the course of their work, and the related question of the use and value of adopting probabilistic safety criteria (PSC) as an aid to judging the results of PSAs. The document includes the output from the four working groups, as well as 11 papers from the 12 papers presented to the TCM. A separate abstract was prepared for each paper. Refs, figs, tabs

  20. BWR feedwater nozzle and control rod drive return line nozzle cracking: resolution of generic technical activity A-10. Technical report

    International Nuclear Information System (INIS)

    Snaider, R.

    1980-11-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-10, 'BWR Nozzle Cracking'. Generic Technical Activity A-10 is one of the generic technical subjects designated as 'unresolved safety issues' pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical issues, the technical studies and analyses performed by the General Electric Company and the NRC staff, the staff's technical positions based on these studies, and the staff's plans for continued implementation of its technical positions. It also provides information for further work to resolve the non-destructive examination issue

  1. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  2. Role of working memory components in planning performance of individuals with Parkinson's disease.

    Science.gov (United States)

    Altgassen, Mareike; Phillips, Louise; Kopp, Ute; Kliegel, Matthias

    2007-06-11

    The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417-423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD). PD resulted in poorer formulation and execution of plans, as measured by the Tower of London task. PD also reduced the efficiency of the episodic buffer and central executive components of working memory, but did not influence storage of verbal or visuospatial information. Planning deficits in PD were particularly linked to problems in integrating multimodal short-term information with long-term memory (episodic buffer). These results emphasize the importance of integrative and executive processing in cognitive problems in PD, rather than simple memory deficits.

  3. The importance of work or productive activity in life care planning and case management

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330

  4. The importance of work or productive activity in life care planning and case management.

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  5. Assessing Technical and Programmatic Viability of Nuclear Waste and Material Stream Disposition Plans

    International Nuclear Information System (INIS)

    R. S. Hill; B. Griebenow

    1999-01-01

    The U.S. Department of Energy (DOE), Office of Environmental Management (EM) has responsibility for cleanup and disposition of nuclear wastes and excess materials that are a legacy of the nuclear arms race. In fulfilling this responsibility, EM applies a systems engineering approach to identify baseline disposition plans for the wastes and materials (storage, stabilization, treatment, and disposal), assess the path viability, and develop integration opportunities to improve the disposition viability or to combine, eliminate, and/or simplify activities, technologies, and facilities across the DOE Complex, evaluate the baseline and alternatives to make informed decisions, and implement and track selected opportunities. This paper focuses on processes used to assess the disposition path viability - the likelihood that current planning for disposition of nuclear waste and materials can be implemented

  6. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  7. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  8. Control of heavy loads at nuclear power plants: Resolution of Generic Technical Activity A-36. Technical report

    International Nuclear Information System (INIS)

    George, H.J.

    1980-07-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-36, Control of Heavy Loads Near Spent Fuel. Generic Technical Activity A-36 is one of the generic technical subjects designated as unresolved safety issues pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical studies and evaluations performed by the NRC staff, the staff's guidelines based on these studies, and the staff's plans for implementaton of its technical guidelines

  9. Technical and economic factors in the planning of a geothermal power station

    Energy Technology Data Exchange (ETDEWEB)

    Chierici, A

    1962-01-01

    The general director of the Larderello Society in Italy reported the results of investigations concerning technical advances. Analysis of geothermal vapor for temperature, pressure, and load, reveals characteristics of the underground system. As an example, the thermodynamic characteristics of a borehole isolated from the actual field being exploited are presented. Also, the determination of the content of non-condensable gases is important. An equation is presented which describes a decrease in non-condensable gases as a function of pressure load. At Larderello the pressure of utilization of the vapor is about 5 atm. A schematic presentation of three types of steam turbines is given. The first, a simple plant with turbines with free discharge, is suitable for exploitation in developing countries. The third type, which has direct vapor condensation adapted to modern requirements, is used at Larderello. The three types are compared by cost and machinery required. Nine figures are provided.

  10. Reentry planning: The technical basis for offsite recovery following warfare agent contamination

    Energy Technology Data Exchange (ETDEWEB)

    Watson, A.P.; Munro, N.B.

    1990-04-01

    In the event on an unplanned release of chemical agent during any stage of Chemical Stockpile Disposal Program (CSDP), the potential exists for contamination of drinking water, forage crops, grains, garden produce and livestock. Persistent agents, such as VX or sulfur mustard, pose the greatest human health concern for reentry. The purpose of this technical support study is to provide information and analyses that can be used by federal, state and local emergency planners in determining the safety or reentry to, as well as the potential for recovery of, contaminated or suspect areas beyond the installation boundary. Guidelines for disposition of livestock, agricultural crops and personal/real property are summarized. Advisories for ingestion of food crops, water, meat and milk from the affected zones are proposed. This document does not address potential adverse effects to, or agent contamination of, wild species of plants or animals. 80 refs., 4 figs., 29 tabs.

  11. The technical approach: The IAEA action plan on the safety of radiation sources

    International Nuclear Information System (INIS)

    Bilbao, A.; Wrixon, A.; Ortiz-Lopez, P.

    2001-01-01

    As part of the measures to strengthen international co-operation in nuclear, radiation and waste safety, the report refers to the implementation of the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials. Starting with background information, the report references the main results of the Dijon Conference and of General Conference resolution GC(42)/RES/12 in September 1998, describing the actions taken by the Secretariat pursuant such resolution and also by the Board of Governors, in its sessions of March and September 1999, as well as by the General Conference, in October 1999 when by resolution GC(43)/RES/10 the Action Plan was endorsed and the Secretariat was urged to implement it. Finally, the report provides information on the status of implementation of the seven areas covered by the Action Plan and on the suggested further actions to be carried out for its implementation taking into account the decisions of the Board in its meeting of 11 September 2000 and the resolutions GC(44)/RES/11, GC(44)/RES/13 and GC(44)/RES/16 of the forty-fourth regular session of the General Conference. (author)

  12. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  13. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  14. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of the TM on “Existing and proposed experimental facilities for fast neutron systems” was threefold: 1) presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems; 2) allow creating a catalogue of existing and planned experimental facilities currently operated/developed within national or international fast reactors programmes; 3) once a clear picture of the existing experimental infrastructures is defined, new experimental facilities are discussed and proposed, on the basis of the identified R&D needs

  15. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  16. The Application of Microcomputers to Aerospace and Defence Scientific and Technical Information Work

    Science.gov (United States)

    1986-10-01

    the test plan. Benchmarking took over 10 months to complete. The UNICORN System from SIRSI Corporation and BRS/SEARCH (Mini/Micro Version) were...early 1980B, database files aimed at business, finance and commerce have become the fastest growing sector of the online industry. Indeed so dominant

  17. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  18. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  19. Molten Salt Demonstration Transmuter (comparison of new technical problems with old US MSR plans)

    International Nuclear Information System (INIS)

    Lelek, V.

    2001-01-01

    A Molten Salt Demonstration Transmuter (MSDT) is required to show the operation and design performance for closing the nuclear spent fuel (NSF) cycle for PWR or WWER reactors operated in the once-through cycle (OTC) mode. The remnant waste (fission products only) would be either permanently stored or held for secondary use. The purpose of this proposal is to establish the design basis for the MSDT and compare contemporary knowledge and demands with that from US plans for MS reactors from 1974, because both technologies are very near (Authors)

  20. Technical Note: MRI only prostate radiotherapy planning using the statistical decomposition algorithm

    International Nuclear Information System (INIS)

    Siversson, Carl; Nordström, Fredrik; Nilsson, Terese; Nyholm, Tufve; Jonsson, Joakim; Gunnlaugsson, Adalsteinn; Olsson, Lars E.

    2015-01-01

    Purpose: In order to enable a magnetic resonance imaging (MRI) only workflow in radiotherapy treatment planning, methods are required for generating Hounsfield unit (HU) maps (i.e., synthetic computed tomography, sCT) for dose calculations, directly from MRI. The Statistical Decomposition Algorithm (SDA) is a method for automatically generating sCT images from a single MR image volume, based on automatic tissue classification in combination with a model trained using a multimodal template material. This study compares dose calculations between sCT generated by the SDA and conventional CT in the male pelvic region. Methods: The study comprised ten prostate cancer patients, for whom a 3D T2 weighted MRI and a conventional planning CT were acquired. For each patient, sCT images were generated from the acquired MRI using the SDA. In order to decouple the effect of variations in patient geometry between imaging modalities from the effect of uncertainties in the SDA, the conventional CT was nonrigidly registered to the MRI to assure that their geometries were well aligned. For each patient, a volumetric modulated arc therapy plan was created for the registered CT (rCT) and recalculated for both the sCT and the conventional CT. The results were evaluated using several methods, including mean average error (MAE), a set of dose-volume histogram parameters, and a restrictive gamma criterion (2% local dose/1 mm). Results: The MAE within the body contour was 36.5 ± 4.1 (1 s.d.) HU between sCT and rCT. Average mean absorbed dose difference to target was 0.0% ± 0.2% (1 s.d.) between sCT and rCT, whereas it was −0.3% ± 0.3% (1 s.d.) between CT and rCT. The average gamma pass rate was 99.9% for sCT vs rCT, whereas it was 90.3% for CT vs rCT. Conclusions: The SDA enables a highly accurate MRI only workflow in prostate radiotherapy planning. The dosimetric uncertainties originating from the SDA appear negligible and are notably lower than the uncertainties

  1. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    International Nuclear Information System (INIS)

    1993-07-01

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review

  2. Nuclear Forensics International Technical Working Group (ITWG): a collaboration of scientists, law enforcement officials, and regulators working to combat nuclear terrorism and proliferation

    Energy Technology Data Exchange (ETDEWEB)

    Schwantes, Jon M.

    2013-10-25

    Founded in 1996 upon the initiative of the “Group of 8” governments (G8), the Nuclear Forensics International Technical Working Group (ITWG) is an ad hoc organization of official Nuclear Forensics practitioners (scientists, law enforcement, and regulators) that can be called upon to provide technical assistance to the global community in the event of a seizure of nuclear or radiological materials. The ITWG is supported by and is affiliated with nearly 40 countries and international partner organizations including the International Atomic Energy Agency (IAEA), EURATOM, INTERPOL, EUROPOL, and the United Nations Interregional Crime and Justice Research Institute (UNICRI) (Figure 1). Besides providing a network of nuclear forensics laboratories that are able to assist the global community during a nuclear smuggling event, the ITWG is also committed to the advancement of the science of nuclear forensic analysis, largely through participation in periodic table top and Collaborative Materials Exercises (CMXs). Exercise scenarios use “real world” samples with realistic forensics investigation time constraints and reporting requirements. These exercises are designed to promote best practices in the field and test, evaluate, and improve new technical capabilities, methods and techniques in order to advance the science of nuclear forensics. Past efforts to advance nuclear forensic science have also included scenarios that asked laboratories to adapt conventional forensics methods (e.g. DNA, fingerprints, tool marks, and document comparisons) for collecting and preserving evidence comingled with radioactive materials.

  3. Istra district heating system. Specific technical report. Appendix 2 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one subject for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system, the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. (EHS)

  4. Fusion of magnetic resonance angiography and magnetic resonance imaging for surgical planning for meningioma. Technical note

    International Nuclear Information System (INIS)

    Kashimura, Hiroshi; Ogasawara, Kuniaki; Arai, Hiroshi

    2008-01-01

    A fusion technique for magnetic resonance (MR) angiography and MR imaging was developed to help assess the peritumoral angioarchitecture during surgical planning for meningioma. Three-dimensional time-of-flight (3D-TOF) and 3D-spoiled gradient recalled (SPGR) datasets were obtained from 10 patients with intracranial meningioma, and fused using newly developed volume registration and visualization software. Maximum intensity projection (MIP) images from 3D-TOF MR angiography and axial SPGR MR imaging were displayed at the same time on the monitor. Selecting a vessel on the real-time MIP image indicated the corresponding points on the axial image automatically. Fusion images showed displacement of the anterior cerebral or middle cerebral artery in 7 patients and encasement of the anterior cerebral arteries in I patient, with no relationship between the main arterial trunk and tumor in 2 patients. Fusion of MR angiography and MR imaging can clarify relationships between the intracranial vasculature and meningioma, and may be helpful for surgical planning for meningioma. (author)

  5. Planning Decrements in Healthy Aging: Mediation Effects of Fluid Reasoning and Working Memory Capacity.

    Science.gov (United States)

    Köstering, Lena; Leonhart, Rainer; Stahl, Christoph; Weiller, Cornelius; Kaller, Christoph P

    2016-03-01

    Although age-related differences in planning ability are well known, their cognitive foundations remain a matter of contention. To elucidate the specific processes underlying planning decrements in older age, the relative contributions of fluid reasoning, working memory (WM) capacity, and processing speed to accuracy on the Tower of London (TOL) planning task were investigated. Mediation analyses were used to relate overall and search depth-related TOL accuracy from older (N = 106; 60-89 years) and younger adults (N = 69; 18-54 years) to age and measures of fluid reasoning, WM capacity, and speed. For overall planning, fluid abilities mediated the effects of age, WM capacity, and speed in older adults. By contrast, fluid abilities and WM capacity mediated each other in younger adults. For planning accuracy under low demands on the depth of search, WM capacity was specifically important in older age, whereas younger adults recruited both WM capacity and fluid reasoning. Under high search-depth-demands, fluid abilities underlay the cognitive operations critical for resolving move interdependencies in both age groups. Fluid abilities and WM capacity undergo significant changes from younger to older age in their unique contribution to planning, which might represent a mechanism whereby planning decrements in older age are brought about. © The Author 2014. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  7. Savannah River Plant Works Technical Department monthly progress report for May 1958: Deleted Version

    Energy Technology Data Exchange (ETDEWEB)

    1958-06-17

    This progress report by the Atomic Energy Division of the Savannah River Plant covers: Reactor Technology; Separation Technology; Engineering Assistance; Health Physics; and General Laboratory Work. (JT)

  8. Senior dental students' career intentions, work-life balance and retirement plans.

    Science.gov (United States)

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  9. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    International Nuclear Information System (INIS)

    1987-09-01

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs

  10. Technical meeting on 'Primary coolant pipe rupture event in liquid metal cooled fast reactors'. Working material

    International Nuclear Information System (INIS)

    2003-01-01

    In Liquid Metal cooled Fast Reactors (LMFR) or in accelerator driven sub-critical systems (ADS) with LMFR like sub-critical cores, the primary coolant pipes (PCP) connect the primary coolant pumps to the grid plate. A rupture in one of these pipes could cause significant loss of coolant flow to the core with severe consequences. In loop type reactors, all primary pipelines are provided with double envelopes and inter-space coolant leak monitoring systems that permit leak detection before break. Thus, the PCP rupture event can be placed in the beyond design basis event (BDBE) category. Such an arrangement is difficult to incorporate for pool type reactors, and hence it could be argued that the PCP rupture event needs to be analysed in detail as a design basis event (DBE, category 4 event). The primary coolant pipes are made of ductile austenitic stainless steel material and operate at temperatures of the cold pool and at comparatively low pressures. For such low stressed piping with negligible creep and embrittlement effects, it is of interest to discuss under what design provisions, for pool type reactors, the guillotine rupture of PCP could be placed in the BDBE category. The topical Technical Meeting (TM) on 'Primary Coolant Pipe Rupture Event in Liquid Metal Cooled Reactors' was called to enable the specialists to present the philosophy and analyses applied on this topic in the various Member States for different LMFRs. The scope of the Technical Meeting was to provide a global forum for information exchange on the philosophy applied in the various participating Member States and the analyses performed for different LMFRs with regard to the primary coolant pipe rupture event. More specifically, the objectives of the Technical Meeting were to review the safety philosophy for the PCP rupture event in pool type LMFR, to assess the structural reliability of the PCP and the probability of rupture under different conditions (with/without in-service inspection), to

  11. Satisfaction with work-life balance and the career and retirement plans of US oncologists.

    Science.gov (United States)

    Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J

    2014-04-10

    To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P hour, 0.977; P work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.

  12. Proposal of a nuclear cycle research and development plan in Tokai works. The roadmap from LWR cycle to FBR cycle

    International Nuclear Information System (INIS)

    Nakamura, Hirofumi; Abe, Tomoyuki; Kashimura, Takuo; Nagai, Toshihisa; Maeda, Seichiro; Yamaguchi, Toshiya; Kuroki, Ryoichiro

    2003-07-01

    The Generation-II Project Task Force Team has investigated a research and development plan of a future nuclear fuel cycle in Tokai works for about three months from December 19, 2002. First we have discussed about the present condition of Japanese nuclear fuel cycle and have recognized it as the following. The relation of the technology between the LWR-cycle and the FBR-cycle is not clear. MOX Fuel Use in Light Water Reactors is important to establish technology of the FBR fuel cycle. Radioactive waste disposal issue is urgent. Next we have proposed the three basic policies on R and D plan of nuclear fuel cycle in consideration of the F.S. on FBR-cycle. Establishment and advancement of 'the tough nuclear fuel cycle'. Early establishment of the FBR cycle technology to be able to supply energy stably for long-term. Establishment of the radioactive waste treatment and disposal technology, and optimization of nuclear fuel cycle technology from the viewpoint of radioactive waste. And we have proposed the Japanese technical holder system to integrate all LWR and FBR cycle technology. (author)

  13. A social survey on the noise impact in open-plan working environments in China.

    Science.gov (United States)

    Zhang, Mei; Kang, Jian; Jiao, Fenglei

    2012-11-01

    The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. The Role of Working Memory in Planning and Generating Written Sentences

    Directory of Open Access Journals (Sweden)

    Ronald T. Kellogg

    2016-02-01

    Full Text Available Planning a sentence with concrete concepts whose referents can be mentally imaged has been shown in past work to require the limited resources of visual working memory. By contrast, grammatically encoding such concepts as lexical items in a syntactic structure requires verbal working memory. We report an experiment designed to demonstrate a double dissociation of these two stores of working memory by manipulating the difficulty of (1 planning by comparing related concepts to unrelated concepts and (2 grammatical encoding of an English sentence in active voice versus the more complex structure of the passive voice. College students (N = 46 composed sentences that were to include two noun prompts (related versus unrelated while concurrently performing either a visual or a verbal distracting task. Instructions to produce either active or passive sentences were manipulated between groups. The results surprisingly indicated that the supposedly easier planning with related concepts made a large demand on verbal working memory, rather than unrelated concepts demanding more visual working memory. The temporal dynamics of the sentence production process appear to best account for the unexpected findings.

  15. EXPLORATION ON TECHNICAL REFORM OF STRATEGIC PLANNING AND URBAN MASTER PLANNING THROUGH THE ANALYSIS ON THEIR RELATIONSHIP%从战略规划与总体规划关系探讨两者技术改革

    Institute of Scientific and Technical Information of China (English)

    赵艳莉; 郑声轩; 张卓如

    2012-01-01

    Through the comparative analysis on the concept features and technical contents of strategic planning and master planning, this paper analyzes the types of urban strategic planning and clarifies the status and role of strategic planning in the planning system of China. Through the case study on the interaction between strategic planning and master planning, the paper elaborates their mutual supporting and complementary relationship, and points out that emphasizing the differentiated development of these two kinds of planning is favorable for the technical progress of planning, and that strategic planning should focus on goal guidance and master planning should strengthen the comprehensive control.%比较分析了战略规划与总体规划的概念特征及技术内容,并梳理城市发展战略规划的几种类型,认识战略规划在我国规划体系中的地位、作用.通过战略规划与总体规划互动的规划案例阐明两者互为支撑、互为补充的关系,提出强调两者的差异化发展有利于规划技术进步,战略规划应突出目标引导性,总体规划应加强综合控制性.

  16. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    Science.gov (United States)

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  17. Students Working Online for Group Projects: A Test of an Extended Theory of Planned Behaviour Model

    Science.gov (United States)

    Cheng, Eddie W. L.

    2017-01-01

    This study examined an extended theory of planned behaviour (TPB) model that specified factors affecting students' intentions to collaborate online for group work. Past behaviour, past experience and actual behavioural control were incorporated in the extended TPB model. The mediating roles of attitudes, subjective norms and perceived behavioural…

  18. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... ensure that requested data can be provided in the desired format, reporting burden (time and financial... DEPARTMENT OF LABOR Comment Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements; Extension With Revisions AGENCY: Employment and Training Administration, DOL. ACTION...

  19. Work plan for waste receiving and processing module 2A waste characterization study

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-11-01

    This WRAP 2A Waste Characterization Study effort addresses those certification strategy functions related to characterization by defining criteria associated with each function, identifying administrative and design mechanisms for accomplishing each of these functions and evaluating alternatives where applicable. This work plan provides direction for completing the study

  20. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  1. Diagnostic systems in nuclear power plants. Proceedings of a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Nuclear power industry has a quite long tradition in on-line diagnostic of mechanical components and a considerable effort was put in developing diagnostic systems which are able to detect arising mechanical problems at an early stage. Computers are increasingly exploited to provide higher level information on process behaviour such as: early indication of the process deviation from normal conditions; rapid identification of the cause of any disturbance; prediction of the evolution of a disturbance; operator aid through computerized help. Following the recommendation of Several Member States to strengthen the activity in this field two divisions of IAEA established in 1995 the International Task Force on Nuclear Power Plant Diagnostics. The scope of the task force cover both technological developments and safety/licensing aspects of diagnostics. This report contains papers presented at the last in the series of Technical Committee Meetings on the Diagnostic Systems in Nuclear Power Plants organized in the framework of International Task Force

  2. Diagnostic systems in nuclear power plants. Proceedings of a technical committee meeting. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    Nuclear power industry has a quite long tradition in on-line diagnostic of mechanical components and a considerable effort was put in developing diagnostic systems which are able to detect arising mechanical problems at an early stage. Computers are increasingly exploited to provide higher level information on process behaviour such as: early indication of the process deviation from normal conditions; rapid identification of the cause of any disturbance; prediction of the evolution of a disturbance; operator aid through computerized help. Following the recommendation of Several Member States to strengthen the activity in this field two divisions of IAEA established in 1995 the International Task Force on Nuclear Power Plant Diagnostics. The scope of the task force cover both technological developments and safety/licensing aspects of diagnostics. This report contains papers presented at the last in the series of Technical Committee Meetings on the Diagnostic Systems in Nuclear Power Plants organized in the framework of International Task Force Refs, figs, tabs

  3. Technical and economic working domains of industrial heat pumps: Part 2 - ammonia-water hybrid absorption-compression heat pumps

    DEFF Research Database (Denmark)

    Jensen, Jonas Kjær; Ommen, Torben Schmidt; Markussen, Wiebke Brix

    2015-01-01

    The ammonia-water hybrid absorption-compression heat pump (HACHP) has been proposed as a relevant technology for industrial heat supply, especially for high sink temperatures and high temperature glides in the sink and source. This is due to the reduced vapour pressure and the non-isothermal phase...... change of the zeotropic mixture, ammonia-water. To evaluate to which extent these advantages can be translated into feasible heat pump solutions, the working domain of the HACHP is investigated based on technical and economic constraints. The HACHP working domain is compared to that of the best available...... vapour compression heat pump with natural working fluids. This shows that the HACHP increases the temperature lifts and heat supply temperatures that are feasible to produce with a heat pump. The HACHP is shown to be capable of delivering heat supply temperatures as high as 150 °C and temperature lifts...

  4. Technical and Economic Working Domains of Industrial Heat Pumps: Part 2 - Ammonia-Water Hybrid Absorption-Compression Heat Pumps

    DEFF Research Database (Denmark)

    Jensen, Jonas Kjær; Ommen, Torben Schmidt; Markussen, Wiebke Brix

    2014-01-01

    The ammonia-water hybrid absorption-compression heat pump (HACHP) is a relevant technology for industrial heat supply, especially for high sink temperatures and high temperature glides in the sink and source. This is due to the reduced vapour pressure and the non-isothermal phase change...... of the zeotropic mixture, ammonia-water. To evaluate to which extent these advantages can be translated into feasible heat pump solutions, the working domain of the HACHP is investigated based on technical and economic constraints. The HACHP working domain is compared to that of the best possible vapour...... compression heat pump with natural working fluids. This shows that the HACHP increases the temperature lifts and heat supply temperatures that are feasible to produce with a heat pump. The HACHP is shown to be capable of delivering heat supply temperatures as high as 140 XC and temperature lifts up to 60 K...

  5. Analyzing Effective Communication in Mathematics Group Work: The Role of Visual Mediators and Technical Terms

    Science.gov (United States)

    Ryve, Andreas; Nilsson, Per; Pettersson, Kerstin

    2013-01-01

    Analyzing and designing productive group work and effective communication constitute ongoing research interests in mathematics education. In this article we contribute to this research by using and developing a newly introduced analytical approach for examining effective communication within group work in mathematics education. By using data from…

  6. Next Generation Nuclear Plant Methods Research and Development Technical Program Plan -- PLN-2498

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2008-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  7. Planning of technical flood retention measures in large river basins under consideration of imprecise probabilities of multivariate hydrological loads

    Directory of Open Access Journals (Sweden)

    D. Nijssen

    2009-08-01

    Full Text Available As a result of the severe floods in Europe at the turn of the millennium, the ongoing shift from safety oriented flood control towards flood risk management was accelerated. With regard to technical flood control measures it became evident that the effectiveness of flood control measures depends on many different factors, which cannot be considered with single events used as design floods for planning. The multivariate characteristics of the hydrological loads have to be considered to evaluate complex flood control measures. The effectiveness of spatially distributed flood control systems differs for varying flood events. Event-based characteristics such as the spatial distribution of precipitation, the shape and volume of the resulting flood waves or the interactions of flood waves with the technical elements, e.g. reservoirs and flood polders, result in varying efficiency of these systems. Considering these aspects a flood control system should be evaluated with a broad range of hydrological loads to get a realistic assessment of its performance under different conditions. The consideration of this variety in flood control planning design was one particular aim of this study. Hydrological loads were described by multiple criteria. A statistical characterization of these criteria is difficult, since the data base is often not sufficient to analyze the variety of possible events. Hydrological simulations were used to solve this problem. Here a deterministic-stochastic flood generator was developed and applied to produce a large quantity of flood events which can be used as scenarios of possible hydrological loads. However, these simulations imply many uncertainties. The results will be biased by the basic assumptions of the modeling tools. In flood control planning probabilities are applied to characterize uncertainties. The probabilities of the simulated flood scenarios differ from probabilities which would be derived from long time series

  8. Hospital nurses' work environment, quality of care provided and career plans.

    Science.gov (United States)

    Hinno, S; Partanen, P; Vehviläinen-Julkunen, K

    2011-06-01

    In several European countries, the availability of qualified nurses is insufficient to meet current healthcare requirements. Nurses are highly dissatisfied with the rising demands of the healthcare environment and increasingly considering leaving their jobs. The study aims to investigate the relationships between the characteristics of hospital nurses' work environment and the quality of care provided, and furthermore to examine Dutch nurses' career plans. A cross-sectional, questionnaire survey of registered nurses (n = 334) working in the academic and district hospitals was conducted in 2005/2006. Previously validated questionnaires translated into the participants' language were used. Factor and regression analysis were used for data analysis. Overall, nurses rated their work environment rather favourably. Five work environment characteristics were identified: support for professional development, adequate staffing, nursing competence, supportive management and teamwork. Significant relationships were found between nurses' perceptions of their work environment characteristics and quality of care provided and nurses' career plans. When work environment characteristics were evaluated to be better, nurse-assessed quality of care also increased and intentions to leave current job decreased linearly. Study findings suggest that nurses' perceptions of their work environment are important for nurse outcomes in hospital settings. Further research is needed to explore the predictive ability of the work environment for nurse, patient and organizational outcomes in hospitals. © 2011 The Authors. International Nursing Review © 2011 International Council of Nurses.

  9. Technical innovation and management

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Yang Cheol

    1982-08-15

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  10. Technical innovation and management

    International Nuclear Information System (INIS)

    Yoon, Yang Cheol

    1982-08-01

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  11. Analysis of change orders in geotechnical engineering work at INDOT : [technical summary].

    Science.gov (United States)

    2011-01-01

    There was a perception at INDOT that the number of change orders connected with geotechnical work was excessive, and that, as a consequence, geotechnical projects were not completed on time or within budget. It was reported that INDOT construction pr...

  12. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ralph [Paducah Citizens Advisory Board (United States)

    2013-07-01

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site

  13. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  14. Effects of dopamine D2/D3 receptor antagonism on human planning and spatial working memory.

    Science.gov (United States)

    Naef, M; Müller, U; Linssen, A; Clark, L; Robbins, T W; Eisenegger, C

    2017-04-25

    Psychopharmacological studies in humans suggest important roles for dopamine (DA) D2 receptors in human executive functions, such as cognitive planning and spatial working memory (SWM). However, studies that investigate an impairment of such functions using the selective DA D2/3 receptor antagonist sulpiride have yielded inconsistent results, perhaps because relatively low doses were used. We believe we report for the first time, the effects of a higher (800 mg p.o.) single dose of sulpiride as well as of genetic variation in the DA receptor D2 gene (DA receptor D2 Taq1A polymorphism), on planning and working memory. With 78 healthy male volunteers, we apply a between-groups, placebo-controlled design. We measure outcomes in the difficult versions of the Cambridge Neuropsychological Test Automated Battery One-Touch Stockings of Cambridge and the self-ordered SWM task. Volunteers in the sulpiride group showed significant impairments in planning accuracy and, for the more difficult problems, in SWM. Sulpiride administration speeded response latencies in the planning task on the most difficult problems. Volunteers with at least one copy of the minor allele (A1+) of the DA receptor D2 Taq1A polymorphism showed better SWM capacity, regardless of whether they received sulpiride or placebo. There were no effects on blood pressure, heart rate or subjective sedation. In sum, a higher single dose of sulpiride impairs SWM and executive planning functions, in a manner independent of the DA receptor D2 Taq1A polymorphism.

  15. ORGANIZATION AND METHOD FOR THE REMOTE LABORATORY WORK OF GENERAL TECHNICAL DISCIPLINE

    Directory of Open Access Journals (Sweden)

    Alfia Sh. Salakhova

    2014-01-01

    Full Text Available The article is devoted to the important problem – use of distant technologies in engineering education in the laboratory experiments. The role of distant experiment in the modern engineering education is discussed. The authors consider structure of the distant system to real experiments control and the method of realization distant laboratory work in the educational process. The analysis of distant laboratory work effectiveness is discussed. 

  16. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  17. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  18. Technical and organisational aspects in enterprise resource planning systems implementation: lessons from a Spanish public hospital

    Science.gov (United States)

    Escobar-Rodriguez, Tomas; Escobar-Pérez, Bernabe; Monge-Lozano, Pedro

    2014-09-01

    Public resources should always be managed efficiently, more so in times of crisis. Due to the specific characteristics of the healthcare sector, there is a need for special attention, especially in regards to hospitals. Administrators need useful tools to be able to efficiently manage available resources, such as enterprise resource planning (ERP) systems. Therefore, an analysis of the effects of their implementation and use in hospitals is valuable. This study has two purposes. One is to analyse the role ERP systems play in aiding the integration of hospital data, with focus on user satisfaction as well as possible resistance to change. The other purpose is to analyse the effects of implanting and using ERP systems in the hospital environment and identifying how certain variables influence the process, especially the existence of different organisational cultures. Results indicate that clinical information has become notably more integrated, despite the lack of flow in the economic-financial area. The heterogeneous nature of the different groups, clinical (Medical, Nursing) and non-clinical (Economic-Financial, Accounting), had a negative influence on the implementation process, and limited the integration of information as well as the system's performance.

  19. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  20. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  1. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  2. Cancer survivorship care-planning: Practice, research, and policy implications for social work.

    Science.gov (United States)

    Wagner, Richard W; Pritzker, Suzanne

    2016-01-01

    Increasing numbers of cancer survivors are living longer than 5 years from their diagnosis date. This has resulted in a growing population of cancer survivors, expected to reach 19 million by 2024. Survivors frequently experience late effects caused by cancer and its treatment, reducing survivors' quality of life in multiple domains. Survivorship care-plans may aid the many physical, psychosocial, and financial needs that emerge posttreatment. However, the lack of reimbursement mechanisms, the limited amount of effectiveness research, and minimal guidelines for content and delivery are barriers to the widespread provision of survivorship care-plans. Challenges and opportunities for social work practice, research, and policy are identified and discussed.

  3. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2010-01-01

    Overview Once again, the bulk of this article reviews the intense activity of a recently completed shutdown, which, although quite unforeseeable until a few weeks before it started, proved by its success that our often advertised capability to conduct major maintenance within a two month period is real. Although safely completed, on-time to remarkable precision, the activity was not without incident, and highlighted our dependence on many experienced, specialist teams and their precise choreography. Even after the yoke was safely closed, magnet re-commissioning and beampipe pumpdown showed new and thought-provoking behaviour. The struggle to maintain adequate technical resources will be a pre-occupation over the coming months, in parallel with the start of truly sustained operation, for which various procedures are still being put in place. Planning for future shutdowns must now become a high priority, with many working groups and task forces already in existence to prepare infrastructure improvements and to...

  4. Work Factors, Work-Family Conflict, the Theory of Planned Behaviour and Healthy Intentions: A Cross-Cultural Study.

    Science.gov (United States)

    Shukri, Madihah; Jones, Fiona; Conner, Mark

    2016-12-01

    The present study examined the roles of work factors (i.e. job demands and job resources), work-family conflicts and culture on predictors of healthy intentions (fruit and vegetable consumption, low-fat diet and physical activity) within the framework of the theory of planned behaviour (TPB). Employees from the United Kingdom (N = 278) and Malaysia (N = 325) participated in the study. Results indicated that higher job demands were significantly related to lower intentions to eat a low-fat diet. Women reported higher intentions to eat a low-fat diet than men did, while participants from the United Kingdom had lower intentions to engage in physical activity compared with those from Malaysia. The efficacy of TPB variables in explaining intentions was verified, with perceived behavioural control (i.e. self-efficacy), attitudes and descriptive norms combined with past behaviour predictive across the samples. The results also suggest the roles of culture and work interference with family variables in moderating TPB-intention relationships and confirm that TPB variables mediate the effects of job demands and job resources on intentions. Practically, to promote health, identifying strategies to reduce stress factors; specifying important cognitive factors affecting work factors and thus, healthy intentions; and acknowledging cultural-specific determinants of healthy intentions are recommended. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  5. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  6. Technical meeting to 'Review of national programmes on fast reactors and accelerator driven systems (ADS)'. Working material

    International Nuclear Information System (INIS)

    2002-01-01

    The 35th Annual Meeting of the Technical Working Group on Fast Reactors TWG-FR, previously International Working Group on Fast Reactors (IWG-FR, created in 1967), was hosted by the Forschungszentrum Karlsruhe (FZK) and was attended by TWG-FR members and advisers from the following Member States: Brazil, China, France, Germany, India, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, and the United States of America. The objectives of the meeting were: to exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); to review the progress since the 34th TWG-FR Annual Meeting, including the status of the actions; to consider meeting arrangements for 2002 and 2003; to review the Agency's co-ordinated research activities in the field of FRs and ADS, as well as co-ordination of the TWG-FR's activities with other organizations

  7. Technical meeting to 'Review of national programmes on fast reactors and accelerator driven systems (ADS)'. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The 35th Annual Meeting of the Technical Working Group on Fast Reactors TWG-FR, previously International Working Group on Fast Reactors (IWG-FR, created in 1967), was hosted by the Forschungszentrum Karlsruhe (FZK) and was attended by TWG-FR members and advisers from the following Member States: Brazil, China, France, Germany, India, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, and the United States of America. The objectives of the meeting were: to exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); to review the progress since the 34th TWG-FR Annual Meeting, including the status of the actions; to consider meeting arrangements for 2002 and 2003; to review the Agency's co-ordinated research activities in the field of FRs and ADS, as well as co-ordination of the TWG-FR's activities with other organizations.

  8. Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for 2014

    Energy Technology Data Exchange (ETDEWEB)

    Hallbert, Bruce [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-07-01

    The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies Pathway conducts targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systems of the U.S. operating light water reactor (LWR) fleet. This work involves two major goals: (1) to ensure that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) to implement digital II&C technology in a manner that enables broad innovation and business improvement in the nuclear power plant operating model. Resolving long-term operational concerns with the II&C systems contributes to the long-term sustainability of the LWR fleet, which is vital to the nation's energy and environmental security.

  9. A Study of Time Spent Working at Learning Centers. Technical Report #17.

    Science.gov (United States)

    Omori, Sharon; And Others

    This study examined the proportion of time children in the Kamehameha Early Education Program schools spend at actual school work in learning centers. Systematic time-sampled observations using multiple observers were conducted in December-January and again in March-April. The subjects, 12 children (6 kindergarteners and 6 first graders) were…

  10. Enhanced technical and economic working domains of industrial heat pumps operated in series

    DEFF Research Database (Denmark)

    Ommen, Torben; Jensen, Jonas Kjær; Markussen, Wiebke Brix

    2015-01-01

    By operating heat pumps (HPs) in series, it is possible to obtain closer match between working fluid and sink- and source streams, resulting in higher coefficient of performance (COP). For industrial HPs, it was found that serial connection of either two or three units results in an increase in COP...

  11. Analysis of traffic signal work backlog in Louisiana : technical assistance report.

    Science.gov (United States)

    1995-07-01

    A review of Traffic Services' traffic signal work records reveals the source of the backlog. During the 1980's, the department experienced personnel cutbacks and hiring freezes that caused the number of field personnel to drop from 40 to 24. Simultan...

  12. Work management administration FY 1995 site support program plan WBS 6.2

    Energy Technology Data Exchange (ETDEWEB)

    Hale, N.S.

    1994-09-01

    Westinghouse Hanford Company`s (WHC) near-term vision is to implement a Site-wide work management program that is consistent from one facility to the other, and can realize workforce efficiencies, minimum down time, and familiarization with facilities uniqueness. Additionally, consistent Hanford Site work management processes can produce meaningful information to be shared complex-wide as the US Department of Energy (DOE) cleans up facilities Site-wide. It is the mission of the WHC Work Management Administration Program to provide guidance and program direction on how to implement consistent and effective work management across the Hanford Site that comply with the DOE and other regulatory requirements. This report describes the steps needed to implement a work management plan at Hanford.

  13. Fiscal 1982 plans of works in National Institute of Radiological Sciences, Science and Technology Agency

    International Nuclear Information System (INIS)

    1982-01-01

    National Institute of Radiological Sciences, since its establishment in 1957, has engaged in the research and other works on the radiation injuries in human bodies, the medical utilization of radiation and the training and education of personnel in the field. The plans of works in fiscal 1982 in the NIRS are described. As special research works, there are the estimation of the degree of danger due to low level radiation for human bodies, environmental radiation exposure due to nuclear facilities, etc., the medical utilization of particle accelerators, and the biological effects of tritium in nuclear fusion reactor development. Ordinary research works include physics, chemistry, genetics, pharmacy, clinical research, etc. In other areas of activities are radiation risk evaluation, radioactivity investigation, technological aid, personnel education and training, and medical work. (Mori, K.)

  14. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  15. Indoor climate, psychosocial work environment and symptoms in open-plan offices

    DEFF Research Database (Denmark)

    Pejtersen, J; Allermann, L; Kristensen, T S

    2006-01-01

    To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...... irritation, skin irritation, central nervous system (CNS) symptoms and psychosocial factors. Occupants in open-plan offices are more likely to perceive thermal discomfort, poor air quality and noise and they more frequently complain about CNS and mucous membrane symptoms than occupants in multi......-person and cellular offices. The association between psychosocial factors and office size was weak. Open-plan offices may not be suited for all job types. PRACTICAL IMPLICATION: Open-plan offices may be a risk factor for adverse environmental perceptions and symptoms....

  16. Design of emergency plans due to the failure risk of hydraulic works - Theory and case study

    International Nuclear Information System (INIS)

    Ochoa Rivera, Juan Camilo

    2006-01-01

    Dams are built to be highly safe hydraulic works. Nevertheless, they are not exempt from a certain failure risk, which turns in a variable value along the time service of the dam. As the mentioned dam-failure risk can be a significant hazard, analysis on dam-break is becoming important, as same as the assessment of its consequences. This type of studies are intended to reduce the costs linked to dam-failure, which are mainly due to the losses of human beings and material goods. A suitable way to minimize such losses consists of designing emergency plans, which permit to prepare and implant appropriate protection measures. A methodological framework to carry out this kind of emergency plans is introduced in this paper, accompanied by a case study corresponding to an emergency plan of a Spanish dam

  17. Radiological emergencies - planning and preparedness

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-12-31

    This information and training film in three parts deals with the technical background for emergency planning, emergency planning concepts and emergency preparedness. It describes the technical characteristics of radiological emergencies on which important emergency planning concepts are based and the purpose of those concepts. The film also demonstrates how emergency organizations must work together to ensure adequate preparedness. The programme reflects the standards, guidance and recommendations of the International Atomic Energy Agency

  18. Relationship between sociopsychological factors and technical and economic indices of work of drivage teams

    Energy Technology Data Exchange (ETDEWEB)

    Pershin, V.V.; Volkov, V.M.

    1986-11-01

    An attempt is described to define the level of harmony within mine drivage teams using mathematical methods in a sociological application. This procedure is derived from a work by Z.S. Coleman. A set ot 10 questions concerning relations with team members was put to each of the members of 7 drivage teams at Kuzbass mines. The answers were assessed on a points scale from lesser to greater harmony within the team. These points were then summarized and mathematically processed. Equations were derived for the degree of harmony or alienation of individual team members and for the degree of harmony attributable to relations both at and outside work. Computer processing of the data obtained revealed a good correlation between the degree of harmony within drivage teams and average monthly earnings. 3 references.

  19. IAEA Technical Meeting on Status of IAEA Fast Reactor Knowledge Preservation Initiative. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    In response to needs expressed by Member States and within a broader IAEA-wide effort in nuclear knowledge preservation, the IAEA has been carrying out a dedicated initiative on Fast Reactor Data Knowledge Preservation (FRKP). The main objectives of the FRKP initiative are to: • Halt the on-going loss of information related to Fast Reactors (FR); • Collect, retrieve, preserve and make accessible already existing data and information on FR. These objectives require the implementation of activities supporting digital document archival, exchange, search and retrieval and facilitating, by developing and using suitable standards and IT tools, the knowledge preservation over the next decades. To this purpose the IAEA has developed the Fast Reactor Knowledge Organization System (FRKOS), a web-based application employing IAEA methodology and approach for categorization of FR knowledge domain, which allows creating a comprehensive and well-structured international inventory of fast reactor data and information provided by different Member States. The resulting Web Portal is established and maintained by the IAEA. The IAEA knowledge preservation initiatives and tools in the field of fast neutron systems - which were presented and very well received during the recent IAEA Fast Reactor and Related Fuel Cycles Conference (FR13) - are supposed to be of interest for national nuclear authorities, regulators, scientific and research organizations, commercial companies and all other stakeholders involved in fast reactor activities at national or international level. The objectives of the technical meeting were to: • Exchange information between the member states/international organizations on national and international initiatives addressing knowledge preservation and data retrieval/collection in the field of fast neutron systems; • Present and discuss the member states’/international organizations’ policies and conditions for releasing to the IAEA both publicly

  20. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable